PAGE : 1 of 8
RINL VSP E.Issue No :1 Dt. 01/12/08
Rev.No: 0 Dt. 01/12/08
CHILLED WATER PRODUCTION
AMENDMENT RECORD
Sl No Amendment Brief description of Authorisation Date Rev.
Page No amendment No.
WORK PROCEDURE REF : QMS/P/TPP/08
PAGE : 2 of 8
RINL VSP E.Issue No :1 01/12/08
CHILLED WATER PRODUCTION
Rev. No :0 01/12/08
Rev.
1.0 CROSS REFERENCE : QMS/M/27.46.08
3.0 RESPONSIBILITY :
5.0 PROCEDURE :
Rev.
5.1.5 For every 2 running chillers one warm water circulation
pump is required. Circulation pump is started as per
the following:-
Rev.
a. Coal chemical plant is informed about starting of
Chilled water supply pump.
5.2.3 All drain valves in main steam header are kept in open
Position.
Rev.
Rev.
Rev.
5.2.17 Condensate pump is started when level in condensate
storage tank is 60-80% in control room panel and con-
densate water is pumped to demineralised plant till
level reaches 30% as indicated in control panel.
6.0 RECORDS :
Rev.