NRP : 10111810013056
Kelas : Dinamika Struktur & Rekayasa Kegempaan/B
∆∆
1. ∆𝑡
1/12×𝑏^4
2(12𝐸𝐼/ℎ^3)
√(𝐾𝑒
/𝑚)
𝜔
2𝜋/𝜔
𝜔√(1−ξ^2 )
𝜔
EVALUASI 2 DINAMIKA STRUKTUR
DAN REKAYASA KEGEMPAAN
Dosen Pengampu :
Afif Navir Refani, ST., MT.
Disusun Oleh :
MOHAMMAD IVAN AKIEDO ZAWA
10111810013066
KELAS B
FAKULTAS VOKASI
INSTITUT TEKNOLOGI SEPULUH NOPEMBER SURABAYA
2020
PENYELESAIAN
NOMOR 1
A. DATA PERENCANAAN
1. Modulus
∆t of Elasticity ( E ) = 25000 Mpa
= 254930 kg/cm²
2. = 0.1 detik
3. H Kolom = 8 m
= 800 cm
4. Dimensi Kolom = 400 x 400 mm
= 40 x 40 cm
5. Massa (m) = 7.5 Ton s²/m
= 75 kg s²/cm
6. Buat Grafik Respons Struktur sampai t = 15 detik
B. PERHITUNGAN
1/12×𝑏^4
Inersia (I) =
√(𝐾𝑒/𝑚)
= √(𝐾𝑒/𝑚)
2549 kg/cm
𝜔
Omega ( ) =
= 5.830151513 rad/s
𝜔/2𝜋
Frekuensi =
= 0.928368075
2𝜋/𝜔 Siklus/s
Periode (T) =
Frekuensi = 1.07715897 s
Faktor Redaman = 𝜔√(1−ξ^2
0.05 )
Teredam
( ) 𝜔 =
d
= 5.822859263 rad/s
Perhitungan Respons Struktur oleh Gempa El Centro - 18 Mei 1940 - Komponen : U-S
w =5,83 rad/det, x = 5%, wD = 5,822rad/det, Dt = 0.1
Untuk n genap : detik
t
C (t n.t ) C{t (n 2) t} e 2 t {vg [(n 2)t ] e 2 t cos[D ( n 2) t ]
3
4vg [( n 1)t ] e t cos[D ( n 1) t ] vg (nt ) cos( D nt )}
t
D(t n.t ) D{t (n 2)t} e 2t {vg [(n 2) t ] e2t sin[D (n 2)t ]
3
t
1 4vg [(n 1)t ] e sin[D (n 1)t ] vg (nt ) sin(D nt )}
A t C (t )
D 1
dan
: B t D(t )
Perpindahan : v t A t sin Dt B t D cos Dt
Kecepatan :
v t C t cos Dt D t sin D t v t
Percepatan : v t 2v t 2v t
v g ( t ) v (t ) v ( t ) v
(t )
10
0
0 2 4 6 8 10 12 14 16
-5
-10
-15
-20
Waktu, t (detik)
100
Kecepatan, v (t) (cm/det)
50
0
0 2 4 6 8 10 12 14 16
-50
-100
Waktu, t (detik)
400
, v (t) (g)
200
Grafik Respon Struktur Percepatan
600
400
0
0 2 4 6 8 10 12 14 16
-200
-400
-600
Waktu, t (detik)
NOMOR 2
A. DATA PERENCANAAN
1. H Bangunan = 15m
2. Fungsi Bangunan = Gedung Toserba
3. Lokasi Bangunan = Malang
4. Kelas Situs = SD
5. Faktor Modifikasi = SRPMK Baja
6. Tebal Pelat Lantai = 120mm
7. Beban Mati Tambahan
- Pada Lantai Selain Atap = 150 kg/m²
- Pada Atap = 50 kg/m²
8. Berat Total Bangunan
Wt = 1D + 0,25 L
B. PERHITUNGAN
1. Kategori Risiko Bangunan
(SNI 1726-2019 Tabel 3)
Kategori = II
Ie = 1
Malang
SS = 0.9 g
Malang
S1 = 0.4 g
Fv = 1.9
SMS = Fa × SS
= 1.026
SM1 = F v × S1
= 0.76
SDS (2/3)
= ×𝑆_𝑀𝑆
(2/3)
×𝑆_𝑀𝑆
= 0.684
SD1 = (2/3)
×𝑆_𝑀1
= 0.507
Sehingga
bangunan
gedung
tersebut
dapat
dianalisis
secara
static
ekivalen
9. Nilai Periode Panjang TL
(SNI 1726-2019 Gambar 20)
Malang
TL = 20 detik
= 0.148 detik
𝑆_𝐷1/𝑆_𝐷𝑆
TS =
= 0.741 detik
= 0.274
0.8
Grafik Respon Spektrum Kota Malang
0.7
Percepatan Respon Spektra, Sa (g)
0.6
0.5
0.4
0.3
0.2
0.1
0.0
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
Periode, T (detik)
R = 8
Ct = 0.0724 x = 0.8
Ta =
𝐶_𝑡×ℎ_𝑛
= ^𝑥 0.632 detik
Cs = 𝑆_𝐷𝑆/ = 0.0855
((𝑅/𝐼_𝑒 )
)
- Berat Balok
Volume Balok =
= 0.02107 mᶟ
Berat Balok =
= 165.415 kg
Berat Balok Total =
= 25804.8 kg
= 25.8048 ton
- Berat Kolom
Volume Kolom =
= 0.12504 mᶟ
Berat Kolom =
= 981.564 kg
Berat Kolom Total =
= 31.41 kg
= 31410 ton
- Berat Bondek
Tebal Bondek = 1 mm
Berat Bondek per m² = 9.5 kg/m²
Berat Bondek = 𝐵𝑒𝑟𝑎𝑡 𝐵𝑜𝑛𝑑𝑒𝑘 𝑝𝑒𝑟 𝑚^2×𝐿𝑢𝑎𝑠
𝐵𝑎𝑛𝑔𝑢𝑛𝑎𝑛×𝐽𝑢𝑚𝑙𝑎ℎ 𝐿𝑎𝑛𝑡𝑎𝑖
= 9576 kg
= 9.576 ton
Beban Mati
Tambahan Lantai = 150 𝑘𝑔/𝑚^2×𝐿𝑢𝑎𝑠
Selain Atap 𝐵𝑎𝑛𝑔𝑢𝑛𝑎𝑛×𝐽𝑢𝑚𝑙𝑎ℎ 𝐿𝑎𝑛𝑡𝑎𝑖
= 151200 kg
= 151.2 ton
-10
-15
10
0
0 2 4
-0.6307820913274 19.25312265671 10.2158415149847 5.8301515 5.8228593 -5
-1.2312188373511 7.714501900069 37.352277422421 5.8301515 5.8228593
-10
-3.0731356476144 4.821231150689 101.647078144622 5.8301515 5.8228593
-15
-1.5536598008317 -3.01798394831 54.5694625289707 5.8301515 5.8228593
-1.7297581400123 -13.53971992222 66.6894939266332 5.8301515 5.8228593 -20
W
-0.0625913332185 -9.115429582874 7.44195467960642 5.8301515 5.8228593
1.44531454433422 -14.38486846069 -40.740608439443 5.8301515 5.8228593
1.33599779286077 -4.110007968021 -43.015258527194 5.8301515 5.8228593
2.61690379486019 1.325163259679 -89.722894444188 5.8301515 5.8228593 Grafik Res
1.05172909465168 5.048035890471 -38.692054320163 5.8301515 5.8228593 150
0.66473981907443 13.78959604166 -30.634492912705 5.8301515 5.8228593
10
0
0 2 4 6 8 10 12 14 16
-5
-10
-15
10
0
0 2 4 6 8 10 12 14 16
-5
-10
-15
-20
Waktu, t (detik)
100
50
0
0 2 4 6 8 10 12 14 16
-50
-100
Waktu, t (detik)
400
Percepatan, v (t) (g)
200
0
0 2 4 6 8 10 12 14 16
-200
-400
-600
Waktu, t (detik)
5.8228593
5.8228593
5.8228593
5.8228593
5.8228593
5.8228593
5.8228593
5.8228593
5.8228593
5.8228593
5.8228593
5.8228593
5.8228593
5.8228593
5.8228593
5.8228593
5.8228593
5.8228593
5.8228593
5.8228593
5.8228593
5.8228593
5.8228593
5.8228593
5.8228593
5.8228593
5.8228593
5.8228593
5.8228593
5.8228593
5.8228593
5.8228593
5.8228593
5.8228593
5.8228593
5.8228593
5.8228593
5.8228593
5.8228593
5.8228593
5.8228593
5.8228593
5.8228593
5.8228593
5.8228593
5.8228593
5.8228593
5.8228593
5.8228593
5.8228593
5.8228593
5.8228593
5.8228593
5.8228593
5.8228593
5.8228593
5.8228593
5.8228593
5.8228593
5.8228593
5.8228593
5.8228593
5.8228593
5.8228593
5.8228593
5.8228593
5.8228593
5.8228593
5.8228593
5.8228593
5.8228593
5.8228593
5.8228593
5.8228593
5.8228593