The methods of modern warfare and its wide deployment of forces make effec-
tive communications one of the vital elements of victory. In the higher levels of
command in the Army this is the responsibility of the Signal Corps. Actually, war
laid far greater demands on Signal troops and equipment than the War Depart-
ment had anticipated, and the rapid development of electronic devices continued
to multiply these demands. For this reason, rather than through any fault of its
own, the Signal Corps was perhaps the least ready of the technical services for the
missions assigned to it after Pearl Harbor. That the Corps managed as well as it
did to meet the demands of war was a tribute to the preparations described in the
preceding volume of this subseries. The Corps' burgeoning activities during 1942
and the first half of 1943 are the theme of this second volume.
Based for the most part on War Department records, especially those of the
Chief Signal Officer, the present history generally reflects his point of view. After
March 1942 each of the technical services had its special problems within the fold
of the Army Service Forces. Those of the Signal Corps were in some respects
unique, and led to a partial decentralization of its functions from 1943 onward
rather than to the centralized and autonomous control of Army communications
that many Signal officers, including the Chief Signal Officer, wanted. The present
volume shows how effectively, despite its organizational problems, the Corps man-
aged in the period under review to prepare for its intricate and world-wide mission
in the final war years.
ALBERT C. SMITH
Washington, D. C. Maj. Gen., U. S. A.
3 December 1954 Chief of Military History
The Authors
George R. Thompson has an A.B. degree from Harvard College and a Ph.D.
degree from Princeton University. In 1942 he was a Carnegie Research Fellow of
the Johns Hopkins University in the history of Graeco-Roman science. From
1943 to 1946 he was an officer in the office of the Chief of Naval Communications.
Since 1947 he has been a member of the historical office of the Signal Corps, and
since 1952 its chief.
Dixie R. Harris received an A.B. degree from Ohio State University in 1933.
After studying law for four years, she was admitted to the bar of Ohio in 1938.
From 1942 to 1944 she was employed by the Signal Corps Publications Agency at
Wright Field, Ohio. From 1945 to 1947 she was with the historical section of the
Office of the Chief Signal Officer, and in 1949 she joined the staff of the Signal
Corps section of the Office of the Chief of Military History. Since 1952 she has
been assistant chief of the Signal Corps historical office.
Pauline M. Oakes entered the employment of the Signal Corps during World
War I. In World War II she acted as a consultant on the administration of per-
sonnel in the executive office of the Office of the Chief Signal Officer. She then
joined the historical staff, from which she retired in 1952.
Dulany Terrett was chief of the Signal Corps historical office from 1946 to
1952 and was responsible for the planning of the Signal Corps subseries. He has a
Ph.B. from the University of Chicago and a Ph.D. in English literature from
Northwestern University, where he taught from 1936 to 1942. He was a historical
officer of the Army Air Forces in World War II. He is the author of the first
volume of the Signal Corps subseries in the UNITED STATES ARMY IN
WORLD WAR IL
viii
Preface
The scope of this, the second Volume devoted to the history of the Signal Corps
during World War II, covers the events of 1942 and the first six months of 1943.
Like the first volume in the subseries, The Emergency, by Dr. Dulany Terrett,
this book presents a broad, panoramic view of the progress and problems, the
defeats and triumphs, of a technical service in wartime. Since the time span covers
only eighteen months, it has been possible to examine certain operations in con-
siderable detail. Such emphasis on particular matters should not be taken to mean
that they are necessarily more important than others which are touched upon
lightly or omitted altogether, but only that they are illustrative or typical of the
three main streams of Signal Corps effort. Research and development, training,
and supply each swelled so quickly to proportions so vast that they almost engulfed
the Signal Corps in the first year of war. How the Corps met the test is the subject
matter of this volume.
The treatment is in general chronological. The story opens with an account of
the beginning, for the United States, of the war itself: those tense moments on
the Hawaiian Island of Oahu when two young Signal Corps men at their radar
picked up and tracked the Japanese bombers winging in to attack Pearl Harbor.
Succeeding chapters carry the account forward on a broad front through the fol-
lowing months of severe shortages, worried production efforts, and feverish prepa-
rations for the first tests in combat with the enemy. They present the confusions
and frustrations that attended the Army's call for signal specialists and items of
signal equipment in incredible numbers. The story is told from the viewpoint of the
Office of the Chief Signal Officer in Washington, where the important decisions
were made that laid the groundwork for the eventually triumphant outcome. This
viewpoint permits only side glances at Signal Corps activity in the theaters around
the world until mid-1943, detailed theater accounts being reserved for the third
and last volume in the Signal Corps' World War II subseries. Finally, this volume
touches upon two problems riot unlike those experienced by some other technical
services: how the Signal Corps fared within the framework of the conglomerate
Army Service Forces, and how a conflict between development and procurement,
and between operations and both, reached a crisis. The book ends with this crisis
brought into focus in a conflict which led to the retirement of the Chief Signal
Officer, but which brought forth no solid solution.
This book is a product of truly collaborative effort. Four writers working to-
gether produced the first draft, often two or more having labored over the same
chapter. The chronological arrangement is owed to Dr. Terrett, until mid-1952
the chief of the Signal Corps historical office when it was located in the Office of
the Chief of Military History. The contents of the book are in general handled
according to subject in time segments: first, through the early months of the war,
then through the second half of 1942, and finally through the first half of 1943.
Only one subject receives strictly topical treatment. It is Signal Corps photography,
or the story of the Army Pictorial Service, which Chapter XIII covers for the entire
18-month period. The research and writing on the procurement and supply
chapters are principally the work of Mrs. Harris, the training chapters the work of
Miss Oakes, and the equipment studies the work of Dr. Thompson. The final
reworking and revision of the first draft, together with much additional research
and writing, were accomplished by Dr. Thompson and Mrs. Harris after this office
was reorganized within the Signal Corps in August 1952.
The authors are indebted to the Historical Section which existed in the Signal
Corps from 1943 to early 1947 and whose members compiled a number of useful
monograph studies, recorded many interviews, and collected a considerable
quantity of valuable historical files. A large debt is owed to Mrs. Helen Sawka for
her faithful and meticulous care and accuracy in checking and typing the manu-
script throughout its several drafts and revisions. The authors are grateful for the
corrections and comments of the many Signal Corps officers and personnel who
reviewed the manuscript. They recognize, too, the invaluable advice and sugges-
tions of those in the Office of the Chief of Military History who supervised and
edited the text, especially Lt. Col. Leo J. Meyer, the Deputy Chief Historian,
Dr. Stetson Conn, his successor, and Miss Ruth Stout, the editor of the subseries.
Many thanks are due likewise to others who aided the editorial process: Mr.
David Jaffe, Mrs. Loretto Stevens, and the photographic editor, Maj. Arthur T.
Lawry, who searched out and prepared the illustrations.
xi
Chapter Page
VI. THE FIRST BILLION DOLLAR SIGNAL CORPS (JANUARY-
JULY 1942) . . . . . . . . . . . . . . . . . . . . . . . 147
T h e Headquarters Supply Organization . . . . . . . . . . . . 147
The Soaring Signal Corps Budget . . . . . . . . . . . . . . . 147
Basic Organization a n d Policies . . . . . . . . . . . . . . . . 149
Facilities Expansion and the Problem of Components . . . . . . . . 151
Material Shortages . . . . . . . . . . . . . . . . . . . . . 154
Production Expediting . . . . . . . . . . . . . . . . . . . . 165
T h e Field Organization . . . . . . . . . . . . . . . . . . . 173
T h e Procurement Districts . . . . . . . . . . . . . . . . . . 173
Difficulties Within the Signal Corps Inspection Service . . . . . . . . 176
The Expansion of Signal Corps Depots . . . . . . . . . . . . . 178
Procurement Growth in the First Six Months of War . . . . . . . . 184
xii
Chapter Page
X. ACCUMULATING STRENGTH OVER THE WORLD (JUNE-
OCTOBER 1942) . . . . . . . . . . . . . . . . . . . . 277
Bolstering the Army Airways Communications System . . . . . . . . . 277
Build-up for the Air Forces in the Northeast . . . . . . . . . . . . . 287
Radars f o r Aircraft Warning . . . . . . . . . . . . . . . . . . 290
Defense to Offense in the West . . . . . . . . . . . . . . . . . . 296
Holding Action i n C B I . . . . . . . . . . . . . . . . . . . . 303
Strengthening Eastern Outposts . . . . . . . . . . . . . . . . . . 305
Illustrations
Original Radar Plot of Station Opana . . . . . . . . . . . . . . . . . 8
Maj. Gen. Dawson Olmstead Arriving at Panama . . . . . . . . . . . 21
N e w Developments i n Signal Communications . . . . . . . . . . . . . 65
Signal Corps Switchboard BD-72 . . . . . . . . . . . . . . . . . . . 69
T h e SCR-300 a n d t h e SCR-536 . . . . . . . . . . . . . . . . . . . 74
T h e SCR-578, Gibson Girl Radio . . . . . . . . . . . . . . . . . . . 82
Airborne AI-10 Radar, SCR-520 . . . . . . . . . . . . . . . . . . . 88
A i r Attack o n a Submarine . . . . . . . . . . . . . . . . . . . . . . 92
SCR-268 a t Pacora, Panama . . . . . . . . . . . . . . . . . . . . . 99
Signal Line Crew Checking Cable . . . . . . . . . . . . . . . . . . 105
Cable-Laying Operations i n Alaska . . . . . . . . . . . . . . . . . . 132
Open-Wire Line i n Alaska . . . . . . . . . . . . . . . . . . . . . . 140
Hand-Finishing a Crystal . . . . . . . . . . . . . . . . . . . . . . 161
A Section of the Philadelphia Signal Depot, August 1942 . . . . . . . . . 176
Training a t Camp Crowder . . . . . . . . . . . . . . . . . . . . 192, 1 9 3
Training a t Fort Monmouth . . . . . . . . . . . . . . . . . . . . 202, 2 0 3
Radiotype Equipment . . . . . . . . . . . . . . . . . . . . . . . . 220
Vehicular Mounting o f Radio Sets . . . . . . . . . . . . . . . . . 230, 2 3 1
xiv
Page
T h e SCR-718, Radio Altimeter . . . . . . . . . . . . . . . . . . . . 244
Coast Artillery Fire Control Radars . . . . . . . . . . . . . . . . . . 259
The SCR-602 Type 8 Lightweight Warning Radar . . . . . . . . . . . 264
Radar Sets SCR-545 a n d SCR-584 . . . . . . . . . . . . . . . . . . 269
Aircraft Warning Radars . . . . . . . . . . . . . . . . . . . . . . 292
Section of the Radio Room, Fort Shafter, Honolulu . . . . . . . . . . . 297
Installation and Maintenance of Signal Equipment . . . . . . . . . . . 301
Antenna Towers of Radio Marina, Asmara . . . . . . . . . . . . . . 311
Communications on the Beach in North Africa . . . . . . . . . . . . . 355
T h e SCR-299 i n North Africa . . . . . . . . . . . . . . . . . . . . 364
Restoration o f Communications Facilities . . . . . . . . . . . . . . . 366
T h e SCR-268 Searchlight Control Radar . . . . . . . . . . . . . . . 376
Men of the 53d Signal Battalion . . . . . . . . . . . . . . . . . . . 383
A Wounded Signal Corps Cameraman . . . . . . . . . . . . . . . . 388
The Signal Corps Photographic Center . . . . . . . . . . . . . . . . 391
Signal Corps Cameramen . . . . . . . . . . . . . . . . . . . . . . 400
V-Mail Being Processed . . . . . . . . . . . . . . . . . . . . . . . 409
A Class i n Projector Repair . . . . . . . . . . . . . . . . . . . . . 414
A Motion Picture Set at SCPC . . . . . . . . . . . . . . . . . . . . 420
Signal Communications From Forward to Rear Areas . . . . . . . . . . 428
AACS Station o n Ascension Island . . . . . . . . . . . . . . . . . . 451
Communications i n C B I . . . . . . . . . . . . . . . . . . . . . . . 462
Wire Lines in New Guinea . . . . . . . . . . . . . . . . . . . . . . 469
Boehme High-Speed Operation . . . . . . . . . . . . . . . . . . . 474
Lend-Lease t o t h e French . . . . . . . . . . . . . . . . . . . . . . 503
General Olmstead . . . . . . . . . . . . . . . . . . . . . . . . . 542
All photographs in this volume are from U.S. Department of Defense files.
THE SIGNAL CORPS: THE TEST
CHAPTER I
December 1941
"This Is Not Drill" a story on the Saturday after Thanksgiving
that had carried the headline "Japanese
At four o'clock on the morning of 7 May Strike over Weekend," and certainly
December 1941, two U. S. Army signalmen it was difficult not to see how ominous the
switched on the radar at their station near international situation was; yet nothing
the northernmost point of Oahu. They had happened, after all, and the round-
would be on duty until seven, when a truck the-clock operating schedule which the
would call to take them back to the post alert had brought about had been relaxed.
for breakfast. The rest of the day would be Another week of menacing headlines had
theirs, for it was Sunday, and the big reached a climax just the day before, on
SCR-270 radar would be closed down until 6 December, with a warning, "Japanese
the next early morning shift. Along with Navy Moving South," on the first page of
2
five other mobile stations spotted around the Advertiser. Many persons felt that it
the perimeter of the island until the per- would be well, in view of the large popula-
manent sites could be made ready, the tion of Japanese origin in the Hawaiian
Opana radar was intended to operate for Islands, to prepare for the possibility that
two hours before dawn and one afterward, a Japanese power drive into the rich
according to the latest operating schedule Asiatic Indies might be accompanied by
agreed upon under the past week's alert.1 trouble stirred up locally.
Throughout the Hawaiian Department The officers charged with aircraft warn-
the alert had been ordered rather suddenly ing saw no reason to anticipate trouble
on Thanksgiving Day, and instructed all beyond that possibility. The operation of
troops to be on guard against acts of sabo- the radars and the control of the Signal
tage. The Honolulu Advertiser had printed Aircraft Warning Company, Hawaii (13
1
Pearl Harbor Attack: Hearings Before the Joint officers and 348 enlisted men) were cur-
Committee on the Investigation of the Pearl Har- rently responsibilities of the signal officer of
bor Attack (Washington, 1946), Pt. 18, pp.
3013-14. (Hereafter, Parts 1 through 39 will be the Hawaiian Department, although when
referred to by the short title Pearl Harbor Attack. the training phase was completed they were
See Bibliographical Note.) Accounts of events in
Washington, including War Department warning to be turned over to the Air Forces, which
messages to the field commanders, may be found controlled the information center and the
in this report. See also Mark Skinner Watson, Chief
of Staff: Prewar Plans and Preparations, UNITED
other elements comprising the aircraft
STATES ARMY IN WORLD WAR II (Washing-
2
ton, 1950), especially pp. 494-520. Pearl Harbor Attack, Pt. 7, p. 3080.
4 THE SIGNAL CORPS
warning system.3 The alert which the com- anything got in the way. Some of these
manding general, Lt. Gen. Walter C. Short, echoes were steadfast, caused by nearby
had ordered into effect upon receipt of cliffs and hills beyond which the radar was
secret messages from his superiors in the blind. Others were temporary—and these
War Department was the lowest of three were the ones to watch for. They indicated
grades, an alert against sabotage. Accord- and tracked airplanes in the sky reflecting
ingly, in order not to risk burning out the the invisible beams of the radar transmitter.
radars, for which there were few spare For the entire three hours of their sched-
parts, the acting signal officer of the uled watch, Privates Lockard and Elliott
Hawaiian Department (in the absence of saw nothing out of the ordinary. Elliott
the signal officer, who was on a trip to was new to the device, but it was as ap-
the United States) had instituted a short parent to him as to Lockard that the oscil-
but intensive schedule calling for radar loscope showed a normal early dawn sky,
search during the three hours considered with an occasional airplane from one of
to be the most dangerous each day. More- the military or naval fields on the island.
over, the platoon lieutenant of the Signal At 0700 they prepared to close down. The
Aircraft Warning Company, Hawaii, who truck was late. The radar hut was warmer
had the Opana crew under his responsi- than the out-of-doors and there were places
bility, had agreed that two men would be to sit down, so Elliott urged that they keep
enough for the Sunday operation and had the equipment on while they were waiting.
let the third, normally on the roster for that He could then take advantage of a good
duty, off with a pass to Honolulu. Pvt. opportunity to practice with it under Lock-
Joseph L. Lockard and Pvt. George A. El- ard's supervision. At 0702 an echo appeared
liott drew the duty, went up to the station on their oscilloscope such as neither of them
Saturday afternoon, and woke themselves had ever seen before. It was very large and
up at four to begin their stint. luminous. They reasoned that something
must be wrong with the equipment. Lock-
The radio aircraft-detection device, the
ard checked it, found it in good working
SCR-270, was very new and very secret. order, and observed that the echo was as
It generated a powerful pulse of electricity large as ever. He took over the dial con-
which its antenna threw out into the sur- trols, and Elliott moved over to the plot-
rounding sky, and it caught upon the lu- ting board. By their calculations, a large
minous face of its oscilloscope the reflection flight of airplanes was 132 miles off Kahuku
of the interrupted electric beams in case Point and approaching at a speed of three
3
miles a minute.
(1) History of Subsection G-2, HUSAFMID- Because such a large formation was so
PAC, United States Army Forces, Middle Pacific
and Predecessor Commands, I, 1-2, 25. (Hereafter
unusual, Private Elliott suggested that they
cited as Hist of Subsec G-2, HUSAFMIDPAC.) report it to the information center. After
OCMH. (2) Pearl Harbor Attack, Pt. 31, APHB some discussion, Lockard agreed, and El-
Exhibit 58, Report on the Establishment of AWS liott made the call at 0720.4 At the informa-
in Hawaii, with Incls 1-181. (3) Testimony of
4
Maj Gen Howard C. Davidson, APHB, pp. 4125- (1) Pearl Harbor Attack, Pt. 22, p. 221, and
51. MS File, Pearl Harbor, DRB AGO. (4) Sig Pt. 29, p. 2121ff; Pt. 27, pp. 517-26; Pt. 36, p. 561.
AW Co, Hawaii, History of the Aircraft Warn- (2) Testimony of Pvts George A. Elliott and Joseph
ing System in Hawaii. AF Archives SIG-(HA- L. Lockard, APHB, pp. 994-1014, 1014-34. MS
WAII )-HI, 7896-54. File, Pearl Harbor, DRB AGO.
DECEMBER 1941 5
tion center at Fort Shafter, atop a small ers was coming in from the mainland that
concrete building used as a signal ware- morning, and he had heard Hawaiian music
house, only Pvt. Joseph P. McDonald, played through the night over the radio, a
580th Aircraft Warning Company, Oahu, common practice for providing a guide
and a young Air Corps lieutenant, Kermit beam to incoming pilots flying in from the
Tyler, were present in the building. The mainland. He assumed that the airplanes
plotters had left at 0700 to enjoy their first the radar was reporting were either the
off-duty day in a month. McDonald had B-17's expected from the west coast, or
been on duty at the private branch ex- bombers from Hickam Field, or Navy patrol
change switchboard since 1700 the previous planes.5
evening, and was waiting out the last ten Back at the Opana station after talking
minutes until he, too, would leave at 0730. with Tyler, Lockard wanted to shut the
So far as he knew at the moment he was unit down, but Elliott insisted on following
alone in the building. There was no one at the flight. They followed its reflection to
the Navy position—no one had been ap- within twenty miles, where it was lost in
pointed. Tyler would not have been in the a permanent echo created by the surround-
center, either, except that he was new, and ing mountains. By then it was 0739.6 A little
the air control officer had thought it a good later the truck came, and they started back
idea for him to take a four-hour tour of duty to the camp at Lawailoa for breakfast. On
to become acquainted with the routine. the way, they met a truck headed away
Thus it was only an accident that Lockard from camp, bearing the rest of the crew
and Elliott happened to be on hand at the with all their field equipment. The driver
detector station after 0700, and part of no for Lockard and Elliott blew the horn to
formal schedule that McDonald and Tyler signal the other truck to stop, but the driver
happened to be on hand after that time at paid no attention and kept on going.
the information center. The Japanese air attack on Pearl Har-
When McDonald answered Elliott's call, bor began at 0755, with almost simul-
Elliott told him that a large number of taneous strikes at the Naval Air Station at
planes was coming in from the north, three Ford Island and at Hickam Field, followed
points east, and asked him to get in touch by attacks on strategic points all over the
with somebody who could do something island of Oahu. The residents of Oahu were
about it. McDonald agreed, hung up, accustomed to the sight and sound of bombs
looked around and saw Lieutenant Tyler used in military practice maneuvers; they
sitting at the plotting board. McDonald did not realize immediately that this time
gave him the message. Tyler showed no in- it was no practice drill. Some of the Signal
terest. McDonald then called back the Corps officers on the island were on duty;
Opana unit, and got Lockard on the wire. others were alerted by the first wave of
By this time Lockard was excited, too. Mc- bombings; still others knew nothing of it
Donald, leaving Lockard on the wire, went until notified officially.
back and asked Tyler if he wouldn't please 5
Pearl Harbor Attack, Pt. 27, p. 569, and Pt. 32,
talk to the Opana men. Tyler did, spoke to pp. 343-44. See also Pt. 10, pp. 5027-33; Pt. 27,
Lockard, and said, in effect, "Forget it." pp. 520-22, 531-33; Pt. 29, pp. 2121-26.
6
Ibid., Pt. 21, Item 38, Original Radar Plot
Tyler had heard that a flight of Army bomb- Opana Station 7 Dec 41.
6 THE SIGNAL CORPS
Lt. Col. Carroll A. Powell, the Hawai- At Schofield Barracks, men from the com-
ian Department signal officer, had just re- munications section of the 98th Antiaircraft
turned from a trip to the mainland. Lt. Col. Regiment were frantically setting up switch-
Maurice P. Chadwick had been appointed boards and connecting telephones at the
only a month before as signal officer of the regimental command post at Wahiawa for
25th Infantry Division, which was charged the gun positions around Wheeler Field and
with the defense of the beaches, the har- Schofield Barracks. The communications
bor, and the city of Honolulu. He was in his lines had been strung to each gun position,
quarters at Hickam Field when the first and at the command post itself all the wires
bomb dropped on the battleships in the har- were in and tagged. But under the Novem-
bor. A few minutes later Japanese planes ber alert the telephones and switchboards
winged in low over his house as they at- remained in the supply room at Schofield
tacked the nearby hangars. Hastily the Barracks as a precaution against theft and
colonel piled mattresses around a steel din- sabotage. About 0830 2d Lt. Stephen G.
ing table and gathered his children under Saltzman and S. Sgt. Lowell V. Klatt saw
its shelter. Then he hurried off to direct the two pursuit planes pull out of a dive over
communication activities of the signal com- Wheeler Field and head directly toward
pany as the troops moved into position.7 them. Each of the men seized an automatic
The officer in charge of the wire con- rifle and began firing. One of the two planes,
struction section of the department signal trapped by high tension wires, crashed on
office, 1st Lt. William Scandrett, was re- the far side of the command post building.
sponsible for installing and maintaining all Running around to look at it, the men felt
permanent wire communication systems worried—to use Saltzman's words—at see-
throughout the islands—command and fire ing an American engine, an American pro-
control cables, post base distribution facili- peller, and an American parachute. "And,
ties, and the trunking circuits from major well, that's about all there was to it"—ex-
installations. By one of the quirks of fate cept that Air Corps Intelligence later de-
that determine the course of events, the En- cided that the plane was Japanese—"and
gineers had been remodeling the tunnels at we went back and finished setting up our
the battle command post, and the Signal communications." 9 Within twenty-five min-
Corps had removed the switchboard and utes the equipment was connected. In fact,
distribution cables to preserve them from communications were set up hours before
the blasting and construction. Thus the com- the guns were in place and ready to fire, in
mand post was virtually without telephone late afternoon.
communication when the Japanese struck. Within a half hour after the first bombs
At once Scandrett's Signal Corps crews fell in Hawaii, the Signal Aircraft Warning
rushed to the command post and restored
SigC Hist Sec with Lt Col William Scandrett (for-
the switchboard and cables in record time.8 merly O/C Wire Const Sec, Hawaiian Dept Sig
7 Off), 28 Jul 44.
Interv, SigC Hist Sec with Col Chadwick (for- 9
(1) Pearl Harbor Attack, Pt. 22, pp. 273-74,
merly Sig Officer, 25th Inf Div, Hawaiian Dept), 278-79. (2) Hist of Subsec G-2, HUSAFMIDPAC,
16 Oct 43. SigC Hist Sec File. (See Bibliographical I, 48-49, citing Ltr, Hq 98th AA, Schofield Bar-
Note.) racks, to CG 53d Brigade AA, Ft. Shafter, 15 Dec
8
Warrant Officer John E. Carney later received 41, sub: Narrative rpt of initial opn of 98th CA
a Legion of Merit for his work that morning. Interv, to meet Japanese attack on Oahu, 7 Dec 41.
DECEMBER 1941 7
Company, Hawaii, had manned all six the carriers by 1030, the latest by 1330.12
radar stations and the information center.10 The Opana station, reopened after the first
About 1000 a bomb blast cut the telephone wave of Japanese planes attacked, tracked
wires leading from the Waianae radar to the that flight or some other flight back from
information center. The Waianae station Oahu in the same northerly direction from
commander at once sent a detail of his men 1002 to 1039. In the confusion and turmoil,
to the nearest town where they confiscated amid numerous false reports from both ci-
a small 40-watt transmitter and antenna, to- vilian and military sources, the Navy sent
gether with the Japanese operator, who was its ships and planes out to search for the
prevailed upon to help install the set in the Japanese carriers, centering the search to
station. By 1100 the Waianae radar sta- the southwest. The Air Corps also sent
tion was communicating with the informa- planes in that direction. There was much
tion center by radio, thus establishing the bitterness afterward over the question of
first radio link in what became within the why there was no search to the north, and
why the radar information of the outgoing
next few weeks an extensive aircraft warn-
flights, apparently headed back to rendez-
ing radio net covering both Oahu and the
vous, was not given to the searchers at the
principal islands nearby.11
time.13 The reasons for this failure are much
The attacking Japanese planes withdrew
the same as those that underlay other mis-
to the northwest, the earliest returning to
haps of that day: the information center,
10
The six 270's were set up on Oahu at Ka- and indeed the entire aircraft warning sys-
wailea, Waianae, Koko Head, Kaaawa, Ft. Shafter, tem, was still in a training status, and if any
and Opana. Hist of AWS Hawaii cited n. 3 ( 4 ) .
Signal AW Company, Hawaii, was the largest one in authority saw the radar plot, he was
single Signal Corps unit in the territory on 7 De- too inexperienced to realize its possible sig-
cember. The following is a strength report by units nificance at the time.14
and stations on Oahu at that date:
Except for one major cable put out of
Enlisted Officer
Total ___________ 1,283 38 12
Joint Committee, 79th Cong, 1st and 2nd
Ft. Shafter Sess, Investigation of the Pearl Harbor Attack
9th Signal Service Co__ 327 1 (Reports of the Joint Committee), Sen Doc 244
Hickam Field (Washington, 1946), p. 63. (Hereafter referred
12th Signal Plat AB__ 27 1 to by the short title Investigation.)
13
324th Signal Co Avn (1)Pearl Harbor Attack, Pt. 1, pp. 139-42,
(later 400th SigC 145-46; Pt. 7, pp. 2952, 3176-80; Pt. 23, p. 999;
Avn) __________ 73 4 Pt. 32, pp. 394-95, 464. See also Opana plotting
407th Sig Co Avn___ 72 3 records, Pt. 21, Items 1, 18, 38. (2) Wesley Frank
428th Sig Co Avn____ 73 3 Craven and James Lea Cate, eds., The Army Air
Schofield Barracks Forces in World War II: I, Plans and Early Op-
24th Sig Co________ 133 4 erations, January 1939 to August 1942 (Chicago:
25th Sig Co________ 136 5 The University of Chicago Press, 1948), 200. (3)
Sig AW Co_______ 348 13 Investigation, p. 69.
14
Wheeler Field For example, Lt. Comdr. W. E. R. Taylor,
45th Sig Plat_______ 23 1 USNR, testified later that, although he was the
307th Sig Co Avn____ 71 3 most experienced controller on the island at the
time, the Opana plot of the incoming Japanese
Source: Pearl Harbor Attack, Pt. 12, pp.
planes would not have meant anything to him had
318-20.
he seen it when it came in on the board. Pearl
11
Hist of AWS Hawaii cited n. 3 (4). Harbor Attack, Pt. 23, pp. 757-58.
ORIGINAL RADAR PLOT OF STATION OPANA
DECEMBER 1941 9
commission at Hickam Field, the Japanese War Department Message Center, had
attack did little damage to signal installa- turned to the commercial facilities of West-
tions. Soldiers and civilians working ern Union and the Radio Corporation of
19
through the second phase of the bombings America (RCA). When he had sent Mar-
quickly patched all the important circuits shall's message from the Center (at 0647
in the Hickam cable. Two hours before Hawaiian time) he had told Western Union
midnight a third of the damaged Hickam that he desired an immediate report on its
Field circuits were back in the original delivery. Now he perspired at the telephone
route, and by two o'clock on the morning trying to get it. "I was very much con-
of 8 December the whole cable was re- cerned; General Marshall was very much
stored.15 concerned; we wanted to know whose
Word of the attack reached the Navy hands it got into. This went on late into
communications center in Washington at the night; I personally talked to the signal
20
1350 Sunday, Washington time, over the office over there." French was not able
direct Boehme circuit from the Pearl Har- to talk to Colonel Powell, the Hawaiian
16
bor radio station. In an action message Department signal officer, who was busy in
over the name of Admiral Husband E. the field, but he did talk to the Hawaiian
Kimmel, the commander in chief of the operator, and told him that it was impera-
Pacific Fleet, the broadcaster was saying tive to be able to tell Marshall who got that
"Air attack on Pearl Harbor. This is not message.
17
drill." Thus he was correcting the first It was not until the following day that
incredulous reaction to the falling bombs. Washington received a definite answer, and
As word spread through the military learned that the RCA office in Honolulu
establishment in Washington, General had delivered the message to the signal cen-
George C. Marshall, the Chief of Staff, ter at Fort Shafter in a routine manner.
wanted to know why the warning message
The warning message had arrived in Hono-
he had sought to send that morning had not
lulu at 0733, twenty-two minutes before the
arrived in time to avert disaster.18 Atmos- attack, and a messenger boy on a motor-
pheric disturbances in the vicinities of San
cycle was carrying it out to the Army post
Francisco and Honolulu that morning had when the bombs started falling. The boy de-
rendered the Army radio circuits unusable. livered the message at Fort Shafter at 1145,
For that reason, Lt. Col. Edward F. French, long after the main attacking groups of
the Signal Corps officer in charge of the 21
Japanese planes had retired. About an
19
15
Interv, SigC Hist Sec with Capt Robert Danser Pearl Harbor Attack, Pt. 22, pp. 237-39; Pt.
(formerly O/C Switchboard Instl Sec, Hawaiian 27, pp. 105-15.
20
Dept Sig O f f ) , 7 Oct 44. Ibid., Pt. 23, pp. 1102-05.
21
16
U.S. Office of Naval Opns, Office of the Chief (1) Memo for Record, Col W. B. Smith, Secy
of Naval Operations: Naval Communications General Staff, 15 Dec 41, p. 474 of Resume of
(1947). First draft narrative, Hist Sec, Office CNC. Papers in War Department Bearing Significantly
17
(1)Pearl Harbor Attack, Pt. 10, p. 4737; Pt. on Events at Pearl Harbor, December 7, 1941,
11, p. 5351; Pt. 23, pp. 608, 935. (2) Hist of prepared by Current Group, OPD, WDGS, 11 Nov
Subsec G-2, HUSAFMIDPAC, I, 55. 44. Copy in OCMH. (2) According to the Hono-
18
See account in Watson, Chief of Staff, and in lulu office of RCA, the message arrived at Fort
Pearl Harbor Attack, Pt. 9, pp. 4517-19; Pt. 2, pp. Shafter between 0900 and 0930, Honolulu time,
915-16 and 933; Pt. 3, pp. 1111-12. and not 1145. The receipt for the message was
10 THE SIGNAL CORPS
hour was spent in decoding it; it had to be Defense Command, and Hawaii. It had left
processed through the cipher machine and the War Department Message Center at
then played back to make sure of its ac- 1205, Washington time.24 But before it
curacy. At 1458 it was placed in the hands reached the Philippines, word of the attack
of the adjutant general of the department, on Pearl Harbor had arrived more or less
who delivered it to General Short's aide, unofficially. About 0300 on 8 December
who gave it to Short at 1500. The warning (it was then 0830, 7 December, in Hawaii)
was in Short's hands, then, 8 hours and 13 a Navy radio operator picked up Admiral
minutes after it had left the War Depart-
Kimmel's message to the fleet units at Pearl
ment Message Center, 7 hours and 5 min-
Harbor. About the same time a commercial
utes after the attack had begun.22
radio station on Luzon picked up word of
the attack.25
War in the Philippines Thus the military forces in the Philip-
Meanwhile, farther west, the Philippines, pines were on combat alert several hours be-
a focus of Army and Navy power for forty fore sunrise and before hostile action
years, came under attack.23 The one o'clock occurred. With the Pacific Fleet crippled
warning message which General Marshall by the attack at Pearl Harbor, the prime
had sought to send to General Short in target in the Philippines became the Far
Hawaii had gone also to General Douglas East Air Force (FEAF). 26 The Japanese
MacArthur, commanding general of the could be expected to launch their initial
United States Army Forces in the Far East attacks against the major airfields. Of these,
(USAFFE). In fact, it had been trans- Clark was the only big first-class airfield for
mitted, in the signal sense of the term, as B-17's in the islands.27 Maj. Gen. Lewis H.
number two in the series of four which went Brereton, commander of FEAF, had es-
out to Panama, the Philippines, the Western tablished his headquarters at Neilson Field,
which had been taken over from a commer-
initialed by the receiving clerk, but not time- cial owner. Nichols Field was of less than
stamped, as was customary. The teletype circuit
between the RCA office in Honolulu and the mes-
top rank. A scattering of others, all the way
sage center at Fort Shafter, which would have down to Del Monte on Mindanao, were but
made messenger service unnecessary, was set up emerging. Clark Field was the only one
and mechanically completed on 6 December, but
was not in operation pending final tests to be comparable to Hickam Field in Hawaii,
completed on Monday, 8 December. Ltr, W. A.
Winterbottom, Vice Pres and Gen Manager, RCA 24
Resume of Papers in War Department Bearing
Communications, Inc. [Honolulu], to David Sar- Significantly on Events at Pearl Harbor, December
noff, Pres RCA, N.Y., 23 Dec 41; and Ltr, David 7, 1941, p. 62.
Sarnoff to Col O. K. Sadtler, OCSigO, 23 Dec 41. 25
(1) Samuel Eliot Morison, History of United
SigC AC 381 Jap Attack. SigC Hist Sec File. States Naval Operations in World War II, III, The
22
Pearl Harbor Attack, Pt. 7, pp. 2930-40, 3163- Rising Sun in the Pacific, 1931-April 1942 (Bos-
64; Pt. 11, p. 5297; Pt. 22, pp. 46-47, 217-18; Pt. ton: Little, Brown and Company, 1948), 168-69.
23, pp. 1102-05. (2) Craven and Cate, The Army Air Forces, I, 203.
23
For a detailed account of prewar planning, the 26
Japanese Monograph 11, Philippine Air Op-
Japanese attack, and the siege of the Philippines, erations Record, Phase One, passim. OCMH.
27
see Louis Morton, The Fall of the Philippines, Terrain Study 94, Philippine Series: Central
UNITED STATES ARMY IN WORLD WAR II Luzon, I, prepared by the Allied Geographical Sec,
(Washington, 1953). GHQ SWPA, 18 Oct 44. OCMH.
DECEMBER 1941 11
and there were no others like them in ing information supplied by the Army's
between.28 new aircraft detection devices, the long-
At Clark Field the Signal Corps had pro- range radars SCR-270 and SCR-271. As
vided telephone and teletype connection yet, however, very few sets had been manu-
with Neilson and Nichols. SCR-197's had factured, and of those few only a half-dozen
recently arrived to give tactical radio com- had been shipped to the Philippines under
29
munications to each of the fields. The the strict priorities established by the War
Philippine Long Distance Telephone Com- Department. Of the half-dozen, only one
pany brought commercial telephone in to was set up and in satisfactory operating
31
Brereton's headquarters from all parts of condition when war came.
Luzon, where local aircraft spotters had The Signal Company Aircraft Warning,
been appointed to telephone reports of Philippine Department, had arrived in
what they saw. The spotters' reports, tele- Manila on 1 August 1941 with about 200
phoned to the communication center at men, but with no aircraft warning equip-
Neilson, were supposed to be relayed by ment.32 The first SCR-270 allotted to the
teletype to Clark.30 Philippines arrived two months later, about
In time, this primitive arrangement of 1 October. At once the men uncrated and
spotters was expected to yield to the mech- assembled it. The SCR-270's were the
anized and infinitely more accurate report- mobile versions. They required less time to
28 erect than did the fixed SCR-271's, but for
(1) Craven and Cate, The Army Air Forces,
I, 175-93, passim. (2) Morton, The Fall of the all that they were massive and complicated
Philippines, p. 43.
29
mechanisms, and it was necessary to spend
A typographical error appears in the History many hours testing and adjusting the sets at
of the Fifth Air Force (and Its Predecessors), Pt.
1, December 1941-August 1942, December 1941 Fort William McKinley, and more hours
installment, page 6, in the Air Historical Division instructing and training the men who op-
File, and has been perpetuated in Craven and Cate, erated them. No test equipment of any sort
The Army Air Forces, I, Pearl Harbor Attack, and
numerous other accounts using the History of the accompanied the set (or, indeed, any of the
Fifth Air Force as source material. This source others which subsequently arrived). Fortu-
document states that each of the major airfields in
the Philippines had "an SCR-297." Obviously,
nately, this first set gave so little trouble
"SCR-297" should read "SCR-197." The SCR- that Lt. C. J. Wimer and a detachment of
197 was the standard point-to-point and ground-to- thirty men shortly were able to take the
air radio which the Signal Corps furnished for such
purposes at this period. No production radio ever radar to Iba, an airstrip on the coast about
bore the nomenclature "SCR-297"; the experi- a hundred miles to the northwest of Clark
mental navigation system bearing that nomenclature
was incorporated into the shoran system in 1943. Field. By the end of October the Iba radar
OCSigO Engineering and Tech Sv, History of was in operation. At about the same time,
Signal Corps Research and Development in World
31
War II, Vol. II, Pt. 4, Proj. 208-A. SigC Hist Sec History of Signal Corps Radar Units in the
File. Philippine Islands, 1 Aug 41-6 May 42, passim.
30
(1) Ltr, Col Alexander H. Campbell (for- Folder, Radar-Philippine-Capt C. J. Wimer, SigC
merly AWS officer, Hq FEAF) to Maj Gen Or- Hist Sec File. This history and the Report on
lando Ward, Chief of Mil Hist, 4 Dec 51. OCMH. Enemy Air Activities, cited in note 40 below, were
(2) Craven and Cate, The Army Air Forces, I, compiled in 1946 by Capt. C. J. Wimer, a Signal
175-93, passim. (3) Hist of Fifth Air Force, Pt. I, Corps officer of the Signal Company Aircraft Warn-
Dec 41-Aug 42, Dec 41 installment, passim. Air ing, Philippine Department.
32
Hist Div File (Copy also in Pearl Harbor Attack, History of Signal Corps Radar Units in the
Pt. 11, pp. 5317-30.) Philippine Islands, 1 Aug 41-6 May 42, p. 1.
12 THE SIGNAL CORPS
Lt. Col. Alexander H. Campbell, the officer recommend strongly that all radar sets and
in charge of aircraft warning activities, set aircraft warning personnel allocated for the
up a central plotting board at Neilson Field Philippines be shipped at once, without ref-
to co-ordinate the activities of all types of erence to the established priority schedules
air warning.33 of shipment.36 Doling out the remaining
Within the next two weeks three more radars in the closing days of November
SCR-270 sets arrived at Manila, as well as Colonel Campbell sent Lieutenant Weden
two SCR-271's in crates. The 271's were of the Signal Company Aircraft Warning
the fixed radars, which had to be mounted to a site some forty-five miles south of
on high towers. It took months to prepare Manila on Tagaytay Ridge. Weden drew
the sites,34 so for the time being the SCR- the damaged set. Any hope that it might
271's, still in their crates, were put into work better in this location soon faded; the
storage. Of the mobile sets, two appeared to set could not be made to operate satisfac-
test satisfactorily, but nothing the men torily, although it was still useful for train-
could do would coax the third to operate ing. About 3 December another Signal
efficiently. Within a few days Lieutenant Corps officer, Lt. Robert H. Arnold, rushed
Rodgers set out by boat for Paracale, the last remaining SCR-270 to Burgos
Camerines Norte Province, Luzon, about Point on the extreme northern tip of Luzon.
125 miles southeast of Manila on the coast Arnold arrived at his location on the night
of the Philippine Sea. He took with him one of 7 December.37 A few days earlier, the
of the better mobile sets and one of the Marine Corps unit at Cavite had informed
crated SCR-271's, planning to use the Colonel Campbell that it had just received
mobile set until the permanent site for the a radar set, but that no one knew how to
fixed radar could be made ready. Rodgers operate it. This was an SCR-268 radar, a
and his men got their 270 set up, and short-range searchlight-control set devel-
started preliminary test operation by 1 oped for the Coast Artillery and not in-
December.35 tended as an aircraft warning set, although
Meanwhile, Col. Spencer B. Akin had it was sometimes used as such. A Signal
arrived in the Philippines to become Gen- Corps crew hurried to Cavite and helped
eral MacArthur's signal officer. Unlike the the marines take the set to Nasugbu, below
situation in Hawaii, where the aircraft Corregidor, and on the southwest coast of
warning company and the operation of the Luzon.38
radars were Signal Corps responsibilities at 36
Ltr, Maj Gen Spencer Akin, Ret., to SigC Hist
the outbreak of war, in the Philippines the Sec, 16 Apr 54. SigC Hist Sec File.
37
After northern Luzon was overrun, Arnold
Air Forces controlled the entire air warning destroyed his radar set, worked his way to the Ilocos
service. Although it was not one of his re- Norte district, and joined the guerrillas. He com-
sponsibilities, Colonel Akin felt impelled to manded the 15th Infantry Regiment, USAFIP,
N.L. (guerrilla), which captured the Gabu airfield
33
Ibid. and other important objectives in the 1945 return
34
For Corps of Engineers difficulties and delays to the Philippines. R. W. Volckmann, Colonel,
in readying sites, see Karl C. Dod and G. L. Marr, United States Army, We Remained: Three Years
The Engineers in the War Against Japan, forth- Behind the Enemy Lines in the Philippines (New
coming volume in the series UNITED STATES York: W. W. Norton & Company, Inc., 1954), pp.
ARMY IN WORLD WAR II, Ch. II. 153-54, 200-202.
35 38
History of Signal Corps Radar Units in the History of Signal Corps Radar Units in the
Philippine Islands, 1 Aug 41-6 May 42, p. 1. Philippine Islands, p. 2.
DECEMBER 1941 13
To sum up, then, this was the tally of ately on a 24-hour alert until further no-
aircraft warning radars in the Philippines tice. On the nights of 3 and 4 December
on the morning of the Japanese attack: an the Iba radar tracked unidentified aircraft
SCR-270 at Paracale, with tuning and north of Lingayen Gulf, and Wimer radioed
testing just being completed, and an SCR- the reports to Neilson Field. Single "hos-
271 in crates; a faulty SCR-270 at Tagay- tile" planes had been sighted visually that
tay Ridge, still giving trouble but able to week over Clark Field, as well, but attempts
be used for training; an SCR-270 at to intercept them had failed.41
Burgos Point, not yet assembled for op- Sometime in the early morning hours of
eration; an SCR-268 at Nasugbu in the 8 December (it was 7 December in Hawaii)
care of an untrained crew; one SCR-271 the Iba radar plotted a formation of air-
still in its crate in a Manila storeroom; and craft offshore over Lingayen Gulf, headed
finally, at Iba, the one radar fully com- toward Corregidor. The Air Forces records
petent and able to perform its role.39 put the time as within a half hour after
The prime purpose of the Iba radar in- the first unofficial word of Pearl Harbor
stallation, according to the young officer in reached the Philippines, and state that the
charge of it, was to demonstrate to com- planes were seventy-five miles offshore when
manders and troops alike what radar was, detected. The Signal Corps officer in charge
what it could do, and how it operated.40 A of the Iba radar remembers the time as be-
grimmer mission emerged in the closing fore midnight, and the distance as 110 miles
offshore. He states that the first news of the
days of November when Colonel Campbell
Pearl Harbor attack had not yet reached
ordered Lieutenant Wimer to go immedi- Iba.42 The 3d Pursuit Squadron at Iba sent
39
Ibid. All sources available to date agree that out planes for an interception. But the long-
the Iba radar was in operation, and several state range radars of that period could not show
that it was the only one. See, for example, Hist of
Fifth Air Force, 24th Pursuit Gp; Lt. Gen. Lewis the elevation of targets, and in the darkness
H. Brereton, The Brereton Diaries, 3 October the pilots did not know at what altitude to
1941-8 May 1945 (New York: W i l l i a m seek the enemy. Poor air-ground radio con-
Morrow & Company, Inc, 1946), p. 65;
Walter D. Edmonds, They Fought With What ditions prevented contact with the Ameri-
They Had (Boston: Little, Brown and Company, can planes, although the Iba station was
1951), p. 59. On the evidence of Col. Alexander
H. Campbell, aircraft warning officer of the V keeping in touch with aircraft warning
Interceptor Command, two sets, one at Iba and headquarters at Neilson, point by point.
the other outside Manila, were in operation.
Craven and Cate, The Army Air Forces, I, 186,
As the American pursuit planes neared the
and Morton, The Fall of the Philippines, p. 44, calculated point of interception about
accept this view. From the Signal Corps point of twenty miles west of Subic Bay, the radar
view, no set could be considered "operational" un-
less it was fully tuned, aligned, and sited, and in tracks of both groups of planes merged,
the hands of a trained crew able to operate it. showing a successful interception. Actually,
Similarly, the SLC set SCR-268 could not properly
be regarded as an aircraft warning radar. By these
the pursuits did not see the Japanese air-
standards, only the Iba radar could qualify.
40 41
Report on Enemy Air Activities Over the (1) Ibid. (2) Craven and Cate, The Army Air
Philippines up to and Including the First Day of Forces, I, 191. (3) Hist of Fifth Air Force.
42
War, as Observed by Signal Corps Radar. Folder, (1) Report on Enemy Air Activities Over the
Radar-Philippine-Capt C. J. Wimer. SigC Hist Sec Philippines. (2) Craven and Cate, The Army Air
File. Forces, I, 203. (3) Hist of Fifth Air Force.
14 THE SIGNAL CORPS
craft and apparently passed beneath them, V Interceptor Command; his executive
missing them altogether as the Japanese officer, Capt. A. F. Sprague; his aircraft
turned and headed back out to sea. warning officer, Colonel Campbell; and
This failure to come to grips with the Campbell's executive officer, Maj. Harold
enemy was the first of a series of tragic mis- J. Coyle.45 Listening to the reports coming
chances which spelled disaster for the Far in, Colonel George predicted that "the ob-
East Air Force. The events of the next few jective of this formidable formation is Clark
hours have become clouded by dispute and Field." A message was prepared warning
43
cannot be reported with accuracy. At any all units of the FEAF of the incoming flight.
rate it appears that the Japanese made sev- Sgt. Alfred H. Eckles, on duty with the
eral strikes at lesser targets before launching FEAF headquarters communication detail,
their main attack on Clark Field. All of the carried the message to the Neilson teletype
initial enemy flights were reported faith- operator. There he waited while he saw the
fully by the aircraft warning service, both message sent, and the acknowledgment of
through calls from aircraft spotters and
the Clark Field operator that it had been
through radar reports. The Iba radar began
received by him. The time was about 1145.
picking up enemy flights due north over Lin-
gayen Gulf about 1120, at a distance of For the next half hour or so, George,
approximately 112 miles. During the next Campbell, Coyle, and Sprague watched the
hour the Iba crewmen were frantically plotting board, where the indications of the
busy, checking and plotting enemy flights, approaching flight were being charted.
radioing the reports to Neilson Field and to Campbell was apprehensive; he kept ask-
subsequent points along the enemy flight ing the others to do something about it, but
path until the planes were lost by inter- the air officers were waiting for the enemy
ference from mountain echoes as the Jap- toapproach close enough to permit the most
anese, flew down Lingayen valley. New effective use of the outnumbered American
flights were appearing before the old ones defending aircraft. When they decided that
were out of sight, twelve of them in all, in the Japanese were within fifteen minutes'
waves of three flights each. The radar was flying time of their target, Captain Sprague
still picking up new flights, still reporting wrote a message. He showed it to George
them, when enemy bombers struck Iba at and Campbell. "What does the word 'Kick-
about 1220, silencing the station and com- apoo' mean?" asked Campbell. They told
pletely destroying it.
44
him, "It means 'Go get 'em.' " Captain
Waiting and watching in the Neilson 45
The account given here was supplied by Colo-
headquarters communications center as the nel Campbell to Dr. Morton, who made the in-
reports started coming in that morning were formation available to the authors. It is based on
Colonel Campbell's recollection of the day's events,
Col. Harold H. George, chief of staff of the documented by a page from his notebook which
he prepared soon after the event, and which he
43
See account in Craven and Cate, The Army kept with him during his confinement in prison
Air Forces, I, 203—13. To date the most exhaustive camps. Ltr, Col Campbell to Gen Ward, 4 Dec
search of available records has been made by Mor- 51. and Incl, page from Notebook of Col Alexander
ton, The Fall of the Philippines. H. Campbell, Aircraft Warning Officer, USAFFE.
44
Report on Enemy Air Activities Over the OCMH. See also Morton, The Fall of the Philip-
Philippines. pines, pp. 85ff.
DECEMBER 1941 15
Sprague took the message into the teletype ineffective as an offensive force. There re-
room for transmission. mained no more than seventeen of the origi-
At this point the record dissolves in a mass nal thirty-five B-17's, the long-distance
of contradictions. Most Air Forces accounts bombers which it had been hoped could al-
state that no warning message was received ter the entire strategy of defense in the area.
at Clark Field, and place the blame vari- The military forces in the Philippines must
46
ously on "a communications breakdown," revert to the prewar concept, and resist as
"cutting of communications to Clark Field long as it was humanly possible to do so.
by saboteurs, and jamming of radio com-
munications by radio interference," 47 and The First Month of War in the Field
the allegation that "the radio operator had
left his station to go to lunch," and that The reverberations of Pearl Harbor
"radio reception was drowned by static brought additional duties to the Signal
which the Japanese probably caused by sys- Corps organization in Hawaii. The biggest
tematic jamming of the frequencies."48 single item of Signal Corps responsibility
Colonel Campbell states that he and the was radar: to get sets in place, get them
others assumed that the "Go get 'em" mes- operating and co-ordinated with the in-
sage had been sent and received properly, formation center and an effective intercep-
since they had had perfect communication tor system. In the first hours after the attack,
with Clark, and since neither Captain the Air Corps had taken over responsibility
Sprague nor anyone else mentioned any for continuous operation of the aircraft
difficulty at the time.49 If the teletype warning service. Crews of the Signal Air-
circuit was out of order, there were direct craft Warning Company, Hawaii, went on
radio circuits to Clark, as well as long-dis- 24-hour duty, working in three shifts: 4
tance telephone and telegraph lines avail- hours of operation, then 4 hours of guard
able in the Neilson headquarters, which duty, then 4 hours off, then repeating the
could have been used. Campbell believes
cycle. Thanks to the Japanese attack, Colo-
that "if the Bomber Command was not
nel Powell, the department signal officer,
notified [as its former commander, Brig.
Gen. Eugene L. Eubank, insists] internal could get equipment, men, and military
administration was at fault." 50 powers as never before. He no longer had to
Whatever the facts, the strike at Clark contend with the peacetime obstacles which
Field, plus the other lesser attacks during had hindered his efforts to put up the several
the day, rendered the Far East Air Force SCR-271 long-range fixed radar stations
allotted to him. The station at Red Hill,
46
Hist of Fifth Air Force, especially 24th Pursuit Haleakala, Maui, had been slated for com-
Group account. pletion on 8 December. The attack on 7
47
Ibid., Maj William P. Fisher, Rpt of Philip-
pine and Java Opns. December intervened, but the project was
48
Morton, The Fall of the Philippines, p. 85. rushed to completion a few days later. At
49
Ibid, p. 85, n. 36. The three officers with
Campbell that morning were all killed not long Kokee, on Kauai, where heavy rains had
after: Colonel George in Australia; Colonel Coyle held up installation of a communications
in Davao; Captain Sprague in the Netherlands cable late in November, the entire station
Indies.
50
Ltr cited n. 45. was completed a few days after the attack.
16 T H E SIGNAL CORPS
and its radar went into operation early in Honolulu until 28 March 1942. In the
January. meantime the temporary information center
The installation of the fixed 271 stations carried on as best it could, in the quarters it
with their towers atop mountain peaks had had occupied for training before the Pearl
been thought to be of primary importance Harbor attack, and with such makeshift
because current opinion among radar en- equipment as it could beg, borrow, or
gineers held that for the best long-range de- steal."
tection, a radar must be located as high as All sections of the Hawaiian Department
possible. Fortunately, the mobile SCR- Signal Office under Colonel Powell worked
270's proved quite good enough for long- around the clock for several weeks follow-
range detection, even at lower sites, as the ing the attack. For about a week, the ci-
radar at Opana had demonstrated on 7 vilian employees of the Signal Office lived
December. As Signal Corps units acquired right on the job. After that they were per-
more men and equipment, they quickly put mitted to go home each night, but many
up other radars and extended communica- preferred the safety of the signal area to
tion nets. Immediately after the attack, they the unknown hazards of the streets outside.
installed two more radars on Oahu. One at The stringent blackout, with armed volun-
Puu Manawahua was borrowed from the teer guards patrolling the streets, presented
Marine Corps; the other was a Navy set, its own dangers. There were stories of
salvaged from the battleship Californiaand trigger-happy guards, and of unauthorized
set up in the hills behind Fort Shatter. On lights shot out or smashed with gun butts.
18 December the Lexington Signal Depot Before long, life settled down to a fairly
shipped two SCR-270's and these Colonel even tempo, although the amount of signal
Powell put on Maui and Kauai when they construction sharply in~reased.'~
arrived. Next, an SCR-271, complete with Communications among the islands, pro-
three gasoline power units, communication vided by a system which was partly Army,
radio equipment, and other attachments, partly Mutual Telephone Company, had
which had been in San Francisco labeled for been unsatisfactory. To the islands of
Alaska, went to Hawaii instead. Three Kauai, Maui, Molokai, and Hawaii, there
other sets due for delivery in January and was also a radiotelephone service. Powell
originally intended for installation on the took over all the amateur radio stations on
continental coasts were similarly diverted, the islands immediately after the attack."*
and a mobile information center from Drew The limited telephone facilities at once
Field was shipped by rail and the first avail- clogged with a rush of civilian and military
able water transportation. Unfortunately calls. The situation, in particular the traffic
the difficulties of shipping so delayed the on the interisland lines, seriously endan-
equipment that it did not arrive in port in gered the Army's and Navy's means of com-
" APHB Investigation Exhibit 58, Report on the "(I) Ibid. ( 2 ) Hist of AWS Hawaii cited n.
Establishment of an AWS in Hawaii. MS File, 3(4). Within a year of Pearl Harbor, the Signal
Pearl Harbor, DRB AGO. For a full account of Aircraft Warning Company, Hawaii, expanded
efforts to establish long-range radar in prewar into a regiment, eventually to be redesignated the
Hawaii, see Dulany Terrett, T h e Signal Corps: 5 15th Signal Aircraft Warning Regiment.
T h e Emergency ( T o December 1941), UNITED Intervs, SigC Hist Sec with Capt Danser, 7
STATES ARMY I N WORLD WAR I1 (Wash- Oct 44, and with Col Scandrett, 28 Jul 44.
ington, 1956), pp. 301ff. 'Ã Pearl Harbor Attack, Pt. 22, pp. 237-49.
DECEMBER 1941
lay entirely at the mercy of the Japanese, per headlines bespoke the coming loss of the
who used the communications wire lying islands. Against this grim background, the
about to bind their captives.64 Signal Corps entered its second month of
The closing days of December brought war, not yet ready, not yet equipped with
only a sharpening of the bleak pattern of enough of anything.
defeat. On Christmas Day Hong Kong fell.
The next day the capital of the Philippines The Impact of War in the Office of the
was declared an open city, and General Chief Signal Officer
MacArthur prepared to withdraw his troops
to Bataan. By the end of the month, Cor- The opening of hostilities found the Chief
regidor was undergoing its ordeal of heavy Signal Officer, Maj. Gen. Dawson Olm-
bombing. The Japanese entered Manila on stead, in the Caribbean. He had left Wash-
the second day of the new year, and newspa- ington on 2 December, heading into what
64
appeared to be one of the most likely storm
(1) History of the 407th Signal Company,
Aviation (formerly 328th Signal Company, Avia- centers, with intent to appraise, stimulate,
tion), Seventh Air Force. AF Archives SIG-407- and strengthen the Signal Corps installa-
HI, 5074-9. (2) Interv, SigC Hist Sec with Maj tions there. While word of the attack spread
Henry S. Wilson, n.d. (3) James P. S. Devereux,
The Story of Wake Island (Philadelphia: J. B. through Washington by radio and telephone
Lippincott Company, 1947), passim. that Sunday afternoon, Signal Corps of-
22 THE SIGNAL CORPS
ficers not already on duty hurried to their tors wanted assignments. The Federal
65
desks. There were scores of emergency Communications Commission, intimately
actions to be put into effect at once as the concerned with matters of frequencies and
Signal Corps went on a full war basis. radio broadcasting and monitoring in gen-
In Quarry Heights in the Canal Zone, eral, needed conferences to map out areas
General Olmstead was inspecting defense of authority. Other agencies and war
installations in the company of Maj. Gen. boards had to be consulted. The matter of
Frank M. Andrews, commanding general priorities for materials and tools was urgent.
of the Caribbean Defense Command, and There were budgets to prepare, appropria-
tions to distribute, new troop allotments to
his signal officer, Brig. Gen. Harry C.
parcel out.
Ingles, when word came of the Japanese
66 There was the matter of lend-lease to con-
attack. For the next few days Olmstead sider. Equipment which had been rather
remained in the Caribbean, making note of too confidently allotted to other nations
the most urgent needs for communication now was ardently desired for this country's
troops and equipment. use and defense. Following the attack on
When he returned to Washington on 16 Pearl Harbor, orders sent out by the War
December, he at once found himself in the and Navy Departments virtually stopped
center of enormous pressures generated by all lend-lease shipments. Trains were side-
the sudden onset of conflict: pressures tracked, ships held at docks, and manu-
which assumed an infinite variety of forms. facturers were instructed to hold shipments
The communications industry clamored for from their factories. The Chief Signal Offi-
instructions and help. Swarms of small cer wired the Philadelphia and Lexington
manufacturers of electronic items de- Signal Depots to stop all shipments of lend-
scended upon the Office of the Chief Signal lease materials, and to attempt to call back
Officer, wrote letters, sent telegrams, and all equipment then en route, while a rapid
asked their congressmen for assistance. survey took place to determine whether
Hollywood, too, sent messages and assur- any lend-lease supplies should be diverted
ances. Many high-ranking officials in the to American forces on the west coast,
huge moving picture industry held Signal Hawaii, and in the Far East. Consequently,
Corps reserve commissions. With Army some materiel intended for lend-lease coun-
photographic needs in mind, they sought tries was sent to American forces, such as
ways of assuring their personnel of most 1,100 miles of Signal Corps wire W-l10-B
useful placement, and at the same time aid- diverted from the British and sent to Ameri-
ing in the war effort. Amateur radio opera- can military units, mostly in the Pacific, but
65 the balance was released to move as
Log entries for 7-8 Dec 41. Deputy CSigO
folder, pp. 171a-71b, SigC Hist Sec File. (See planned. Shipments actually were delayed
Bibliographical Note.) only a few days. The Axis had propagan-
66
(1) Interv, SigC Hist Sec with Brig Gen Car-
roll O. Bickelhaupt, SigC Res, Vice-President dized that lend-lease would cease entirely
AT&T Co., 16 Feb 50. (2) Memo, CSigO for all as soon as the United States needed all its
Brs and Divs OCSigO, 22 Dec 41, sub: Inspec trip resources for self-defense. But in his report
by CSigO to Caribbean Defense Comd, 4—17 Dec
41. SigC OT 320.3 AWS. to Congress on 12 December, the President
DECEMBER 1941 23
removed all fear that lend-lease might not events of war now differed from the plans.
continue.67 Necessities which might have been satisfied
Most of all, the demand for equipment months hence overwhelmed the military
was bitter, pressing, and confused. Olm- establishment with the most immediate
stead was beset on all sides: from Brig. Gen. urgency. Like its units overseas, the Signal
Simon B. Buckner, Jr., in Alaska and Lt. Corps headquarters organization would
Gen. John L. DeWitt of the Western De- have to improvise. It would have to stretch
fense Command, whose long-standing and the supply of materials and men on hand
vociferous complaints concerning the inade- far beyond the limits of desirability.
quacy of defenses in their areas now seemed Acquiring Manpower
wholly justified; from Maj. Gen. Henry H.
Arnold of the Army Air Forces whose needs Pearl Harbor set off tremendous demands
were obviously urgent; from the General for manpower, both civilian and military,
Staff; from the Allied missions in this coun- which the Signal Corps could not hope to
try. From every outpost requests poured in meet until training facilities and allotments
for more air warning equipment, higher were greatly increased. On 7 December
powered transmitters, and radios better just over 3,000 officers and 47,000 enlisted
suited to the locality. Commanders overseas men comprised the Corps' total strength.68
became more critical of what they had, and By 10 December revised authorizations for
more impatient at delays or omissions in Signal Corps personnel for duty with the
filling requisitions. Often the items they Army Air Forces alone called for 3,664 offi-
asked for had not gone into production. cers and 63,505 enlisted men.69 Filling the
Basically, all demands centered around authorizations was another matter. On 7
the three essential ingredients for the brew December nearly every Signal Corps reserve
of war: money, men, and materials. Money, officer was already on duty or under orders
it could be assumed, would be forthcoming to report for duty. In its senior Reserve
in adequate supply. But funds alone could Officers' Training Corps units, the Signal
not be converted immediately into fully Corps had far too few basic and advanced
trained and fully equipped armies. All the students, and had to face the fact that of
advance planning had been predicated upon those few, some would take commissions in
70
a theoretical mobilization day (M Day) other branches of the Army.
which would permit an orderly progression The need for radar men had been given
from a state of peace to a state of war. But the sharpest sort of underscoring by the
M Day had remained unidentified, and the events of Pearl Harbor. Yet in the highly
specialized courses for radar specialists and
67
(1) International Div ASF, A Guide to Inter-
68
national Supply, p. 12; (2) Msgs, Actg CSigO to CSigO, Annual Report, 1942, p. 114. The An-
Philadelphia and Lexington SigC Depots, 9 Dec nual Reports of the Chief Signal Officer for the
41; (3) Ltr, CSigO to O/C Lexington SigC Depot, years 1942-46 exist in a few typed copies only, in
13 Dec 41, sub: Temporary storage of defense aid the files of the Office of the Chief Signal Officer.
69
material; (4) Msg, Maj A. E. Brundage, OCSigO Summary of Authorizations, revised 10 Dec 41.
Lend-Lease Off, to Philadelphia SigC Proc Dist, SigC SPSTP 5, PMP 1942.
70
17 Dec 41. SigC 475.7 Lend-Lease 4, 16 Dec 41-10 (1) Historical Sketch of the Signal Corps
Jan 42. (5) Richard M. Leighton and Robert W. (1860-1941), Eastern SigC Schools Pamphlet 32
Coakley, Global Logistics and Strategy, 1940-1943, (Ft. Monmouth, N. J., 1942), p. 127. (2) Ltr,
UNITED STATES ARMY IN WORLD WAR CSigO to TAG, 24 Jan 42, sub: Expansion of
II (Washington, 1956), p. 247. ROTC units. SigC 326.2 ROTC Gen.
24 THE SIGNAL CORPS
technicians in the Aircraft Warning De- personnel by transfer to form cadres for the
partment at the Signal Corps School at Fort II, III, and IV Interceptor Commands,
Monmouth, only 169 officers and enlisted and to provide the entire quota of air-
men were on the rolls. About one hundred craft warning personnel for Iceland and
Signal Corps officers were taking advanced Greenland.73 That same month the com-
electronics courses at Harvard University manding general of the Caribbean Defense
and at the Massachusetts Institute of Tech- Command asked for AWS troops for Pan-
nology, and between two and three hundred ama and Puerto Rico. To furnish them
more specially selected, recently commis- would take all the remaining men, and the
sioned young engineers and physicists were Signal Corps had been counting on them to
studying radar in the British Isles as mem- help train the expected 17,000 novices.
bers of the Electronics Training Group. Joining forces, the Signal Corps, the
The supply of trained aircraft warning Army Air Forces, and the Air Force Com-
specialists was pitifully inadequate, despite bat Command united in an urgent plea to
the fact that no other training activity had the General Staff not to wait until the small
received so much critical attention in the "breeding stock" of trained AWS special-
past six months. The Air Defense Board's ists in the United States was entirely de-
report, issued in the previous September, pleted, but rather to expand the Aircraft
had recommended expansion of the signal Warning Service immediately by 320 of-
aircraft warning service by 2,200 officers ficers and 5,000 enlisted men, charging
and 40,200 men, the first sizable increment them off against the 17,000 in the ex-
to be added in October.71 The War Depart- pansion program when it should be ap-
ment had responded to the recommenda- proved.74 The 5,000 men to be furnished
tion on 13 November by asking Congress could come, they argued, from replacement
for funds to supply 900 officers and 17,000 training centers other than the Signal Corps
men, with the first increment to be added center. This would be necessary because the
in December. total estimated output of the Signal Corps
Meanwhile, the supply of trained men Replacement Training Center for Novem-
had melted away. Throughout the summer ber and December would be only 3,220,
of 1941, Air Forces and Coast Artillery and of these 1,320 would be required for
quotas in the Signal Corps School Aircraft replacements for task forces, overseas garri-
Warning Department had remained un- sons, base forces, and overhead for schools
filled, class after class.72 From existing Air- and replacement training centers, which
craft Warning Service (AWS) units the
73
Signal Corps drew men to form cadres for Memo, CSigO for Chief of Opns Br OCSigO,
23 Oct 41, sub: Rpt of deficiencies in equip, pers,
new units in this country and at overseas and tng of com units of U.S. Army. SigC OT 322
bases. Indeed, by October the I Intercepter Gen.
Com is used throughout this volume as the ab-
Command had lost almost all of its signal breviation for both communication and communi-
cations in accordance with Army practice during
71
(1) Terrett, The Emergency, p. 287. (2) the war period, although Signal Corps men used the
Memo, Col Otis K. Sadtler, SigC, for Gen Bryden, abbreviation comm.
74
5 Dec 41, sub: Expansion of AWS. SigC 322 Sig Memo, AAA A-1 for CofS, n. d., sub: Im-
AW Cos, 1940-43. mediate rqmts for AWS troops. SigC 322 Sig AW
72
Terrett, The Emergency, p. 288. Cos, 1940-43.
DECEMBER 1941 25
current personnel policy required to be of them to go to Fort Dix to be trained
75
maintained at full strength. in the I Interceptor Command, and 1,700
The air staff had prepared the action to Drew Field for the III Interceptor Com-
memorandum on 6 November, but on 5 mand. Colonel Bushey asked Maude
December an air staff officer reported that whether the Signal Corps could furnish the
it had still not reached the desk of the 300 officers needed. At a conference with
Chief of Staff. It was "bogged down in a the air staff the next day, Lt. Col. Frank C.
mass of conferences and trivial non-con- Meade, head of the Air Communications
currences in the G-1, G-3, and G-4 di- Division, promised the full number at once.
76
visions of the General Staff." To consider Before the conference ended, G-3 had au-
the nonconcurrences and get the paper thorized an additional 5,000 men for the
cleared would take another month because other coastal frontier: 2,200 to be divided
of the approaching holidays, he thought, between the Portland Air Base, Oregon, and
and he suggested an alternate plan which Fort Lawton, Washington, for the II In-
could be accomplished at once because the terceptor Command, and 2,800 to be as-
necessary staff approvals were already in signed to Camp Haan, California, for the
hand. It involved the use of Fort Dix, New IV Interceptor Command. Ten of the Sig-
Jersey, and Drew Field, Florida, as train- nal Corps officers went to Panama on 20
ing centers for the desired 5,000 men, the December; 55 to Fort Dix, 25 to Mitchel
Signal Corps to furnish cadres of trained Field, and 60 to Drew Field on 10 Decem-
men from its existing aircraft warning com- ber; while 60 reported to Seattle and 90 to
panies to form new ones. Riverside, California, on 12 December.77
It was this plan that won approval in the These 10,000 men so hastily allotted on
first frantic hours after word of the Pearl the morrow of Pearl Harbor to man Air-
Harbor disaster reached Washington. Early craft Warning Service units had had none
Sunday evening, Lt. Col. Orin J. Bushey, of the radar training that the Signal Corps
Army Air Forces staff A-1, called Maj. gave at Fort Monmouth. For the trainees
Raymond C. Maude in the Signal Corps' who went to Fort Dix, the I Interceptor
Air Communications Division to tell him Command was already operating an aircraft
that the Chief of Staff had given Bushey warning school of sorts. For those going to
authority to put the plan into operation the Pacific coast, there were no training
at once. It called for 5,000 men for the facilities in operation as yet. For others go-
eastern and southern coastal frontiers, 3,300 ing to Drew Field, the III Interceptor Com-
75 mand planned, but did not yet have,
Incl, Memo, Brig Gen Harry L. Twaddle,
ACofS, for CSigO, 19 Nov 41, sub: Immediate another training school.
rqmts for AWS, and 1st Ind, Lt Col Henry L. P. At Drew Field, four aircraft warning
King, OCSigO, for ACofS G-3, 22 Nov 41, with
OCSigO R&W Action 1, Air Communications Divi- companies, the 530th, 307th, 317th, and
sion (Air Com Div) to Plans Sec, 25 Nov 41. SigC
77
322 Sig AW Cos, 1940-43. (1) OCSigO Air Com Div Off Resume, n. d.
76
Incl (c), Memo (initialed "R. P. C." A-1) [7 Jan 42], attached to Memo, Col Meade for O/C
for Chief of Air Staff, 5 Dec 41, sub: Status of Opns Br, 8 Jan 42, sub: Prog rpt for week ending
AW action by the air staff, with OCSigO R&W 8 Jan 42. SigC C&E folder Air Com Div. (2)
Action 1, Opns Br to Air Com Div, 13 Dec 41, OCSigO R&W Action 1, Air Com Div to Mil Pers
sub: Immediate rqmts for AWS troops. SigC 322 Div, 10 Dec 41, sub: Augmentation AWS conti-
Sig AW Cos, 1940-43. nental U.S. SigC 402 Pers-Gen Air.
26 THE SIGNAL CORPS
79
331st, plus a signal headquarters and head- erate them. On 11 December the Signal
quarters company, were in existence on 7 Corps broadcast an urgent appeal to all
December. It had been expected that corps area commanders, asking them to
these units would form the nucleus of the enlist without delay an unlimited number
projected III Interceptor Command school. of amateur and commercial radio operators
But within a week, 1,700 infantrymen had for the Signal Corps. A recognized license
arrived from Camp Wheeler, Georgia, to was accepted in lieu of a proficiency test,
be taught radio operation "without advance and the men were rushed to the nearest re-
notice or instructions as to their disposi- ception center for transfer to the Signal
tion." To provide shelter, authorities hastily Corps Replacement Training Center.80
erected a tent city, made up of Army tents The Signal Corps had been adding ci-
supplemented by a circus tent from vilian workers at the rate of about 1,000
Ringling Brothers' winter quarters in Sara- per month during the last half of 1941.81
sota, Florida. On 16 December classes for In the last three weeks of December, it
information center technicians, radio opera- added 1,000 per week, more than doubling
tors, and administrative clerks began. The the midyear figure and bringing the total
rainy season was well advanced. Classes of to about 13,500.82 This meant that at least
forty men each marched about in quest of every other worker was a "new" employee,
comparatively dry spots in which to study. with less than six months' experience. Such
A pile of tent sidings was likely to provide an influx could not be assimilated without
the only sitting-down space. Instructors a certain amount of confusion, especially
shouted above the noise of diesels that were within the headquarters offices, where
plowing up the mud preparatory to build- practically all sections were understaffed.
ing operations. The teacher shortage was Prospective civilian employees had to be
so acute that several students who had been interviewed, processed through Civil Serv-
teachers in civil life were pressed into service ice, and then trained to the particular work
as instructors, although they knew nothing of the office which employed them. Conse-
about the subjects they taught and had to quently the original staff, both officer and
learn as they went along, hoping to keep a civilian, worked all hours trying to keep
jump ahead of their classes. The calls for abreast of current rush jobs while inter-
aircraft warning personnel were so pressing viewing, training, and finding space for
that radio operators were partially trained new employees. Interviews had to be sand-
in fourteen days and sent overseas immedi- wiched in between long distance calls and
ately, a practice which all training officers conferences; new employees meant more
deplored. But it had to be done.78
There were urgent calls for enlisted spe- 79
Ltr, CSigO to Chief of Inf, 15 Jan 42, sub:
cialists in other categories. Jamaica in the Sig com Jamaica, BWI. SigC OC 381 1942.
80
TWX, AG to CG's All Corps Areas, 10 Dec 41.
British West Indies, for example, had more AG 351 (12-9-41) ER-A. SigC 341 Gen Recruit-
radio sets on hand than it had men to op- ing No. 2, Apr 41-Dec 41.
81
On 30 June 1941, the figure stood at 5,753; 1
78
(1) Interv, SigC Hist Sec with Lt Col Frank August, 6,902; 7 December, about 10,000. (1)
E. Herrelko, Air Corps, 11 Mar 47. (2) History CSigO, Annual Report, 1942, p. 127. (2) Signal
of 2d Training Battalion (formerly 588th Signal Corps Information Letters, No. 2 (January, 1942),
Aircraft Warning Battalion), Third Air Force, p. 12, and No. 3 (February, 1942), p. 9.
82
Oct 43, Apps. I, II, III. AF Archives Sig-2-HI. CSigO, Annual Report, 1942, p. 127.
DECEMBER 1941 27
desks; more desks called for more space. qualified men in the field. The inspection
In most instances desks had to be crowded training program initiated in Philadelphia
into the original office space in the old before the outbreak of the war and an addi-
Munitions Building on Constitution Ave- tional one begun in Chicago shortly after-
nue and in sundry other buildings scattered ward could not fill the requirements. In
around Washington. December there were some 800 inspectors
Even with enough money to hire the ci- in the field, of whom about 260 were in the
vilians needed, it was not always possible Chicago Procurement District, and the rest
to find employees possessing the desired in the Philadephia Procurement District.
qualifications. Private industry, the armed They were working long hours of overtime
services, and government agencies and bu- without pay before 7 December; afterward,
reaus were competing fiercely for qualified they worked even longer hours. At the same
employees, while Civil Service procedures time, Selective Service was subtracting from
in the first weeks of war still used peacetime the numbers on hand and drawing potential
wage standards and job descriptions that inspectors away from the first training
were somewhat unrealistic in the light of course.83
the sudden emergency. The need for more The Production Expediting Section
workers was most evident in the Signal under Maj. Carrington H. Stone furnished
Corps' procurement activities, which in- another example of turmoil within the Pro-
creased manyfold. curement Division. Since November the sec-
The Procurement Division in the Office tion had fallen under the scrutiny of Wallace
of the Chief Signal Officer, barely able to Clark and Company, management engi-
support the increasingly heavy work load neers whom General Olmstead had hired to
during the fall of 1941, was literally over- survey his organization and make recom-
whelmed during the first weeks of war. For mendations to increase general efficiency
example, its Inspection Section was just be- and to ease expansion for war. Two days
ing organized. In December it comprised before the attack on Pearl Harbor, Wallace
but two men: Maj. John Shuler, the officer Clark had proposed reorganizing the en-
in charge, nominally transferred from the tire system of operation within the Expe-
Purchase Section in October but still diting Section. The recommendations were
obliged to spend most of his time on Pur- mandatory, and the work involved had to
chase Section work, and one reserve officer, be accomplished concurrently with the
1st Lt. William H. Caruthers, Jr. Shuler
83
knew his section was being organized to SigC 314.7, Inspec Sec, Daily Hist Data, 15
Oct 6-Dec 41; 12 Dec 41-24 Jan 42. Signal Corps
provide staff supervision over the hundreds historical data sheets were maintained by all sec-
of inspectors who were already operating in tions of the Procurement Division, Office of the
Chief Signal Officer; all bear the Dewey classifi-
procurement districts and the thousands of cation number 314.7. Folders referred to in this
additional ones who would be needed for a chapter are: Procurement Division, Inspection
full-scale procurement program, but he had Section, 15 October 1941-6 December 1941, and
12 December 1941-24 January 1942; Procurement
received no specific directive outlining his Division, Production Expediting Section, 5 Decem-
functions and duties, and he had as yet only ber 1941-21 December 1941; Procurement Divi-
sion, O/C, 11 December 1941. Hereafter these will
one small office for the staff he hoped to get. be referred to as Daily Data (with appropriate
One problem, he knew, was the scarcity of section and date of report).
28 THE SIGNAL CORPS
mounting daily schedules, despite the short- vide the manufacturer, Crosley, with the
84
age of workers. headphones, microphones, and antennas, so
Expediters were expected to be profes- that the sets could be shipped complete
85
sional breakers of bottlenecks, whatever the from the Crosley plant.
nature of the stoppage, and in the first weeks Field installations everywhere needed ad-
of war the staff in the headquarters section ditional civilian workers, and the Secretary
had to eliminate numerous peacetime pro- of War granted blanket authority to em-
cedures which slowed up production and ploy any civilians required. The Civilian
procurement. For example, complaints from Personnel Branch of the Office of the Chief
the depots that radio parts were missing Signal Officer stepped up its recruiting ef-
among the elements sent them for assembly forts to meet the increasing demands from
brought to light one of the difficulties of the the corps areas, exempted posts, and sta-
current method of procuring radio sets. tions.86 Requests poured in for civilians to
During the prewar period, Signal Corps con- fill special posts outside the continental lim-
tracting officers placed separate contracts for its of the United States. Puerto Rico needed
individual components of radio sets, thus radio mechanics. Panama wanted large
distributing work among more manufactur- numbers of radio engineers, telephone in-
ers. Final assembly of the sets took place at stallers, and telephone engineers. To meet
the Signal Corps depots. This system had the request, Civilian Personnel arranged
worked well enough when the volume of with the American Telephone and Tele-
procurement was moderate. But with the graph Company to borrow some of the
sudden upward sweep of requirements for company's cable splicers for temporary duty
radio in late 1941, the contracting officers in in Panama. In the Canal area, a desperately
the rush of their work tended to overlook needed radar SCR-271 waited for trained
some of the components when they placed engineers to install it. Signal Corps was
contracts. Soon after Pearl Harbor, depot asked to recruit civilians with all haste, and
crews trying to assemble sets for overseas send them along by the first available air
shipment discovered parts missing: any- transportation.87
thing from nuts and screws to antennas. In
the belief that an incomplete set was better Accelerating Production
than none, and might be used in some fash- Such signal equipment as was available
ion, the depots had been distributing a had to be allotted carefully to those who
number of imperfect sets, to the outrage of needed it most. The Signal Corps cupboard,
overseas units that received them. Expe- although not completely bare, was not well
diters arranged that henceforth assembly stocked. The final report of the Army Serv-
should be delegated to the manufacturer of ice Forces states that on 7 December 1941
the largest component, who would assemble the Signal Corps had less than 10,000 us-
complete sets, obtaining the minor compo- able ground and vehicular radio sets, less
nents by his own purchase or manufacture,
85
or from a Signal Corps depot. Thus, for 86
Ibid, 21 Dec 41.
OCSigO Civ Pers Br Diary, 9 Dec 41. SigC
example, with the widely used short-range Hist Sec File.
87
radio set SCR-284, the depots would pro- Ibid., 14, 19 Dec 41. The treatment of Signal
Corps personnel and training activities is continued
84
Daily Data, Prod Exped Sec, 5, 8 Dec 41. in Chapter II, below.
DECEMBER 1941 29
than 6,000 aircraft radio sets, and less than provided, Signal Corps units and equip-
500 radar sets "available," but does not ment moved out of California ports. Some
state whether the equipment was available ships that had left before 7 December for
in depots, or was in the hands of troops.88 the Philippines were caught by the war en
Certainly insofar as radar sets were con- route, and were diverted to Australia. The
cerned, deliveries of commercial models had Army transport Meigs, for example, had
not begun until February 1941, and alto- headed out of San Francisco for Manila at
gether only 491 sets had been delivered the end of October, with some Signal Corps
by the end of the year.89 These had gone men and equipment aboard. After a stop
immediately to aircraft warning troops and at Honolulu, she was on her way, and cross-
to training schools as soon as they came off ing the international date line when her
the production line.90 Practically none of radio received news of Pearl Harbor. Di-
them remained in depots for distribution. verted from Manila, she went on by way
But even had the Signal Corps possessed of Fiji to Darwin, Australia, only to be
equipment and supplies in abundance, the bombed and sunk in the harbor there.92
Army did not have enough ships available On the whole, loss of signal equipment
to carry all the kinds of military items in transit across the Pacific was unexpect-
needed when war struck,91 and signal edly light during the early weeks of the
equipment carried a lower priority than war. Of the approximately 18 transport
ordnance items. Finally, there were not vessels which war caught at some point in
enough escort vessels to afford effective pro- the Pacific between the west coast of the
tection in hostile waters—and suddenly all United States and the Philippines bearing
the waters were hostile. troops and supplies to MacArthur, two,
During this first month of war all move- both of which were unescorted freighters,
ment was to the west. As quickly as cargo were sunk in the course of the journey. Only
space could be assigned and escort vessels one of the two, the Malama, sunk about 600
miles from Tahiti on 1 January, was known
88
Logistics in World War II, Final Report of to have signal equipment aboard. It had
the Army Service Forces, 1 July 1949 (Washington,
1947), Chart 2, Logistic Situation, December 1941,
only twenty-five tons of Signal Corps cargo.
pp. 16-17. About seven ships turned back after 7 De-
89
(1) Capt Harry M. Davis, Signal Corps De- cember. The remainder were diverted in
velopment of U.S. Army Radar Equipment, Pt. II,
1937-1941, SigC historical monograph A-2, p.
midocean to Australia. The Navy transport
116; and Pt. III, Long Range Radar, SCR-270- Republic, flagship of a convoy which had
271; SigC historical monograph A-3, pp. 47-48. formed just west of Honolulu on 29 Novem-
SigC Hist Sec File. (2) OUSW, Weekly Statistical
Report, Sec. II, Air Signal, Nos. 5-28, 2 Aug 41-10 ber and which was diverted, after Pearl
Jan 42. Until 9 March 1942 these reports were issued Harbor, from Manila to Brisbane, had
by the Statistical Branch, OUSW. From 9 March
to 9 April they were issued by the Office of Statisti-
aboard the 36th Signal Platoon and its
cal Services, Headquarters, Services of Supply.
92
From 9 April 1942 they were known as the Weekly (1)Incl 2 with Ltr, CG Hq USASOS, APO
Statistical Summary rather than as the Weekly 501, 17 May 44, to CG USAFFE, sub: Radio op-
Statistical Report. Hereafter referred to as Weekly erators, statement of S. Sgt Maurice L. Monson,
Stat Rpt. detailed 832 Sig Sv Co. Unit Histories: 431st Sig
90
Pearl Harbor Attack, Pt. 27, pp. 353-59. Heavy Const Bn. (2) Interv, SigC Hist Sec with
91
Leighton and Coakley, Global Logistics and Sergeant Monson (formerly chief radio operator
Strategy, 1940-1943, pp. 202-212, passim. USAT Meigs), 14 May 44.
30 THE SIGNAL CORPS
organizational equipment. This convoy, the first weeks of war the definition lost
carrying the first American forces to Aus- meaning. Which plan, whose needs, what
93
tralia, reached Brisbane on 22 December. computations were to have precedence? For
The shortage of signal equipment was so example, in May 1941 the Signal Corps
critical and the competition for supplies so planning staff had estimated that require-
bitter that on 23 December General Olm- ments for wire W-l10-B would be 412,000
stead issued a plea to all segments of the miles for the first year after M Day. But in
Army to conserve signal supplies and to the three weeks after the attack on Pearl
practice the strictest economy, particularly Harbor, "actual" requirements as com-
during training and maneuvers. Use only puted by commanders in the field and staff
qualified men familiar with signal equip- planners rose to 832,000 miles. At the same
ment to act on surveys, and on inventory time, requirements for five-pair cable in-
96
and inspection reports, the Chief Signal creased thirteenfold above 1940 estimates.
Officer urged. Waste nothing; remove and Actually, requirements could not be ex-
repair all serviceable parts of discarded sig- pected to be firmly fixed at this early date.
nal equipment for use in training. Units One thing was clear enough: whatever the
which had been supplied with nonstandard final figures might be, they would exceed the
types of equipment should not turn it in, existing capacity of the communications in-
he warned, no matter what the tables of dustry to produce. The Signal Corps had
basic allowances said. Rather, they should devoted much effort to prewar planning for
repair equipment and continue it in service industrial expansion, and most of it was
until it was possible to supply the newer sound enough so that given time it would
types authorized in the tables.94 cover the enormous requirements of global
There were obstinate blocks to be over- war. But without funds or authority to
come before the goal of quantity produc- translate plans into action, little could be
tion, great enough to fill all requirements, done except to blueprint the objectives.
could be achieved. The immediate de- Thus only one of the numerous proposed
mands for equipment constituted only part
plans to expand the communications indus-
of the total requirements. Requirements, in
try had been launched before the opening
the peacetime definition, were "the com-
of hostilities. Only 15 out of 180 radio man-
puted needs in supplies and equipment of
ufacturers in the country had produced any
all kinds necessary to meet a military plan
military radios for the Signal Corps before 7
established by the War Department." 95 In
December; of the 15, only 5 had built sepa-
93
(1) A. J. Bingham, Reinforcement of the rate plants for their military work and were
Philippines (1947), pp. 9-11; (2) List of Trans-
port Vessels at Sea, Pacific Ocean, 7 December
producing sets acceptable by military
1941; (3) Memo, ACofS G-4, WDGS, for TAG,
21 Jan 42, sub: Request for info as to whereabouts SigC Hist Sec File. For a general discussion of Army
of vessels. AG 565 (1-19-42) Msc (G-4/33861). requirements see Chapter III of R. Elberton Smith,
OCT Hist Sec File. Army Procurement and Economic Mobilization, a
94
Memo, CSigO for TAG, 23 Dec 41, sub: Con- volume in preparation for the series UNITED
servation of SigC equip and supplies. SigC 400 STATES ARMY IN WORLD WAR II.
96
Gen 5. L. H. Drake and F. W. Thomas, Prod Div,
95
Andre E. Gerard, The Story of Supply in the Philadelphia SigC Proc Dist, Industrial Summary:
Signal Corps in World War II (1945), Pt. I, Re- Signal Corps Procurement of Wire and Cable, 15
quirements, SigC historical monograph B—1, p. 2. Jan 46, pp. 42-45. SigC Hist Sec File.
DECEMBER 1941 31
standards.97 Obviously expansion of manu- would depend for the major share of its
facturing facilities was going to be a basic wartime procurement. They would bear the
problem. In the first week of war the need initial strain of the procurement crisis. They
for a much larger electron tube industry was must lend their industrial know-how to train
evident, and representatives of the Army, smaller firms in mass production methods.
the Navy, and the Office of Production Those among them who were already pro-
Management met to devise an expansion ducing signal equipment must redouble
program of $14,000,000 affecting eleven their efforts, take on new contracts, and
companies making transmitting, cathode speed up deliveries.
ray, and special purpose tubes.98 Neither contracting nor delivery was
On the day after the Pearl Harbor attack, progressing well. Some critical items for
the Signal Corps' Production Expediting which money had been allotted under the
Section drafted a letter which it sent out to fiscal year 1941 procurement program had
contractors on 9 December. The letter asked not been contracted for; in particular 1,500
for immediate, reply by wire detailing what SCR-288's, substitute short-range radio sets
might be needed to attain the maximum for ground troops, who needed them badly,
possible production, right up to the limit of and 20 SCR-251 sets, instrument blind-
twenty-four hours a day, seven days a week. landing equipment for the Air Forces. In
"What are your limitations respecting raw fact, less than half of the $498,311,000 ap-
materials, skilled labor, plant facilities and propriated for critical items of signal equip-
machines?" the Signal Corps wanted to ment on the regular and first supplemental
know." On 20 December the Signal Corps fiscal year 1942 expenditure programs had
wired officials of the General Electric Com- been awarded.
pany, Bendix Radio Corporation, Westing- Deliveries especially were discouraging.
house Electric Manufacturing Company, Under the procurement programs for
Radio Corporation of America Manufac- fiscal years 1940 and 1941, the week ending
turing Company, Aircraft Radio Corpora- 6 December showed that of the 54 impor-
tion, and Western Electric Company tant signal items contracted for, 33, or a
inviting them to meet with certain officers total of 61 percent, were behind schedule.
of the Signal Corps at the Philadelphia Sig- Delinquencies included 14 types of ground
nal Corps Procurement District on the after- radio totaling 4,542 sets. Contracts for radio
noon of 23 December to discuss procure- sets SCR-536, the handie-talkie used by air-
ment plans and facilities.100 These were the borne and parachute troops, called for de-
industrialists upon whom the Signal Corps livery of 1,000 sets in November, but none
97
J. A. Everitt and others, Industrial Planning were delivered. Deliveries of short-range
Br, Philadelphia SigC Proc Dist, Industrial Sum- portable sets SCR-194 and SCR-195
mary: Signal Corps Procurement of Radio and were delinquent by 2,500 sets. Six items for
Radar Equipment, 1 Jul 46, p. 25. SigC Hist Sec
File. the Air Forces—-frequency meter sets SCR—
98
The Industrial College of the Armed Forces, 211, marker beacon receiving equipment
Economic Mobilization Course, Prod Div, Rpt of
Subcommittee 36, Electronics Production Problems RC-43, microphone T-30, radio compass
(1 Nov 46), Bk. 12, p. 5.
99
SCR-269, and aircraft liaison and com-
Daily Data, O/C, 11 Dec 41.
100
Msg, CSigO to Officials of General Electric
mand radios SCR-187 and SCR-274—also
et al., 20 Dec 41. SigC 400.12 Gen 8. were behind schedule, but fortunately none
32 THE SIGNAL CORPS
of the delinquencies were serious enough to Meanwhile, the Under Secretary of War
101
interfere with the delivery of aircraft. was urging his supply chiefs to redouble
In the three weeks remaining in December their efforts to push production. Speed, not
after Pearl Harbor, contracting speeded up cost, should be the main consideration, he
appreciably, but delivery lagged behind. added. New facilities for production had to
By the end of the year, 16 types of ground be found and provided with contracts, while
sets had fallen behind schedule for a total all existing contracts should be reviewed
of 5,812 units, as had six critical types of with the purpose of stepping up deliveries.
102
aircraft signal equipment. At that rate, it A three-shift production schedule ought to
would take years to complete the equipment be applied everywhere. Construction orders
orders, yet the stupendous production pro- should be given War Department produc-
gram required completion in from 12 to 18 ers, and new contractors should be given let-
months. ters of intent, later to be replaced by formal
Most dire of all shortages were those per- contracts, in order that the firms could pro-
taining to radar. Shortages of materials and ceed at full speed pending the availability
tools had delayed production; until July of additional funds.105
1941, aircraft detector equipment (which All peacetime planning had looked to-
became known as radar in 1942) had a ward prompt decentralization of military
preference rating no higher than A—1—B.103 procurement and the easing of shackling
In December 1941 radar was to American legal restrictions. With the first War Powers
industry a new and uncharted realm, and Act, 18 December 1941, Congress granted
only two or three of the largest companies to the President sweeping powers to expedite
had ventured into it. Only three types had the war effort, including the authority to
been delivered in any quantity: the SCR- release government procurement of mili-
268, searchlight control (SLC) radar, and tary equipment and supplies from certain
two early warning ( E W ) radars, the mo- restrictive legislation.106 Executive Order
bile SCR-270 and the fixed SGR-271. The 9001, 27 December, delegated this author-
SCR-268 was especially important because ity to the Under Secretaries of War and
it could provide approximate target height Navy, who in turn could delegate it to their
data. Enough of them could relieve the seri- various supply chiefs. The supply chiefs
ous shortage of optical height finders for fire could then give their district procurement
control, and also provide a stopgap for the
officers a great deal more freedom of action.
Anticipating these measures, on 17 De-
Air Corps' need for ground-controlled in-
cember the Under Secretary of War had
terception radars. On 16 December the Sig-
already issued to his supply chiefs General
nal Corps contracted for 600 additional sets Directive 81, allowing them to award con-
at a cost of $33,000,000 from supplemental tracts for supplies and construction without
funds.104
advertising and waiting for bids, and even
101
Weekly Stat Rpt No. 24, 13 Dec 41, pp. 1-2. without obtaining the Under Secretary's
102
Weekly Stat Rpt No. 28, 10 Jan 42, p. 2.
103 105
Pearl Harbor Attack, Pt. 27, pp. 353-59. Memo, USW for CSigO et al., 29 Dec 41, sub:
104
1st Ind, Brig Gen Brehon Somervell, G-4 Broadening the base of defense prod. SigC 400.13
WDGS, on Ltr, TAG to CSigO, 16 Dec 41, sub: Gen 24.
106
SLC equip with 1 Incl. G-4/33736 OCS 16701- First War Powers Act, 1941, P. L. 354, 77th
17500 No. 8. Cong, 1st Sess, Ch. 593.
DECEMBER 1941 33
approval, although this last would be re- $1,000,000 without reference to the Chief
quired for any contract involving five mil- Signal Officer. The fifth provision gave the
lion dollars or more. Moreover, the Office Chief Signal Officer a means of exercising
of Production Management would have to control over procurement by providing for
clear any contract involving one million or specific procurement instructions to be is-
107
more. The Under Secretary left it to his sued to the procuring agency.
supply chiefs to determine any further safe- These measures could not sweep away
guards and to fix the extent of decentraliza- all legal and procedural barriers to speedy
tion, saying, "It is desired in the interest of procurement. Further liberalization would
speed that authority for placing orders be be necessary in the months to follow: more
decentralized to your field agencies to the extensive use of informal rather than time-
greatest extent compatible with efficiency consuming formal contracts, formulation of
and proper safeguarding of the public specific procedures, and standardization of
interest." contractual clauses covering advance pay-
General Olmstead at once drew up his ments, renegotiation, subcontracting, pat-
plan for procurement, which was approved ents, and the like. These could be handled
by the Under Secretary of War on 3 Janu- largely within the framework of the policy
ary 1942. The plan embodied five major laid down by General Olmstead, and
points. First, all major purchases would be through subsequent War Department pro-
made through the Signal Corps' procure- curement circulars.108
ment districts and laboratories, with con- Thus, in the first three weeks of war, the
tracting officers authorized to negotiate Signal Corps along with the other services
purchases and make awards in any amount of the Army took vigorous action toward
less than $1,000,000 without reference to solving the insistent calls for men and
the Office of the Chief Signal Officer. Sec- equipment. The actions were basic, but
ond, contracting officers would be ap- their results would not be apparent
pointed for all corps areas, departments, quickly. Months would pass before progress
and mobile forces. Third, depots were au- at home could be reflected at the fighting
thorized to buy specified stock items with- front.
out reference to the Chief Signal Officer. 107
Memo, CSigO for USW, 22 Dec 41, sub:
Fourth, laboratories were freed from the Decentralization of proc, and 1st Ind, OUSW to
restrictions hampering the purchase of ex- CSigO, 3 Jan 42. SigC 400.12 Gen 8.
108
See Chapter VI, below, for Signal Corps Pro-
perimental equipment and authorized to curement activities during the early months of
purchase it in any amount less than 1942.
264-211 O - 78 - 4
CHAPTER II
Company to increase its strength, ACS had ordain the composition of the units. The
been carefully selecting the additional men; T/O signal units were as standardized as
about half were fully or partially qualified the multiplication table and pyramided up
radio operators, the remainder touch to the top echelon of the troop basis struc-
typists who had satisfactorily passed the ture with little variation in size or
3
radio operators' aptitude test. The main- composition.
stays of the company were men with long The outbreak of war had found the plan-
experience and excellent records of service ning divisions in the Office of the Chief
in Alaska. Signal Officer trying vigorously to disrupt
With this nucleus and in this geographi- the neat structure. Not rigidity but flexibil-
cal pattern, the Signal Corps now had to ity and elasticity in organization and
fill out vastly in numbers and spread out strength were essential to economy in the
vastly in place. Some of the expansion nec- use of manpower, and never had there been
essary had already occurred, as these num- a time when the Signal Corps had not had
bers and locations showed. The very open- to economize in men. The war had already
ing hours of war, however, had created thrown a spotlight upon new military con-
vacuums all over the world, which sucked ditions and methods which differed greatly
in troops the instant they could be dis- from those known earlier. Further, climate
patched from the United States. American and terrain were obviously going to affect
soldiers went out eastward to Iceland and operations a great deal. In a place where
westward to Australia. The Signal Corps good radio transmission could be attained
units with these early task forces were hur- only through the use of a rhombic antenna
ried to overseas bases and combat zones, array, five men would be needed to install
where the generally inexperienced men who the equipment. If the situation were such
comprised the units came up against un- that a wire strung between two trees would
usual demands for individual skill and suffice, it could be set up by one man, who
stamina. And nowhere, as judged by war might be, as well as not, the driver of one
standards, was there more than a token sig- of the unit's trucks. In some areas, a unit
nal force. might have all the advantages of modern
communications systems in the vicinity. In
The Limitations Imposed others, it might find it necessary to trans-
by Tables of Organization port a 2,000-pound transmitter in pieces,
back-packed over miles of rough terrain, to
The tools with which an arm or service set up the only communications station for
shapes its units and fits them into the Army's hundreds of miles around. Uniform, inelas-
structure are (1) its troop program, that tic T/O units could not be expected to func-
is, the troop basis, which forecasts the num- tion equally well in all such widely varying
ber and kind of units to be in active service situations.
within a general time limitation; and (2) Obviously it was desirable to tailor units
its tables of organization, T/O's, which to fit the situation. But the process of setting
3
up tables of organization or of changing
First Draft, Alaskan Communication System
History (1945), pp. 173, 175. (See Bibliographical
those already in effect was laborious and
Note.) Bound MS copy in SigC Hist Sec File. protracted. First, the Signal Corps made a
36 THE SIGNAL CORPS
detailed breakdown of the duties of each which accorded with the prevailing defense
man in the proposed unit and determined plan for mobilizing only the four field
the grades and ratings it considered ap- armies. It authorized the Signal Corps 1
plicable. Then, by way of The Adjutant signal service regiment; 5 aircraft warning
General, the proposed table went to the regiments; 19 battalions (2 armored, 4 air-
War Department General Staff—to G-1, craft warning, and 1 for each army and
to G-3, and to the War Plans Division corps) ; a headquarters and headquarters
(after 9 March 1942, to comparable di- company for each of the 4 interceptor com-
visions of the Services of Supply before it mands; 2 signal troops, 29 platoons, air
reached the General Staff). There the re- base; 32 division signal companies, 5 of
quirements unit studied the table under the them armored; and 79 other companies
guidance of Signal Corps officers, who had of various sorts, of which 48 pertained di-
direct knowledge of the equipment the unit rectly to the air arm and the remainder were
would use; the training unit scanned the depot, repair, operations, photographic,
table from its own viewpoint; then the op- pigeon, construction, radio intelligence,
erations unit considered it. If all went well, and service companies.6
approval was forthcoming. But at any stage The 1942 troop unit basis for mobiliza-
in its progress, the proposed table might tion and training, issued in January, em-
be sent back to the Signal Corps for re- bodied the 1941 faults of rigidity and mea-
vision, after which it would have to start gerness.7 For the ground forces, it did in-
4
all over again. clude more of the needed nondivisional
Finally fixed, the table of organization units than had the 1941 basis; yet it re-
was likely to become a white elephant, pon- mained very weak, particularly in construc-
derous and sacred. Newer equipment might tion units. Reports from the field follow-
change the basic duties of at least some ing the 1941 maneuvers had consistently
members of the team, or changed tactics urged that the number of construction units
might make more or fewer men desirable. in a battalion be doubled or tripled. Gen-
But the table of organization remained fixed. eral Olmstead had held out strongly for two
Therefore, the Signal Corps often resorted companies, with additional construction
to organization charts or special tables as units in the General Headquarters U. S.
it set up new units which necessarily would Army reserve, where they would be avail-
be more or less experimental.5 Yet these had able to reinforce corps and army units as
no standing in troop bases, the determinants required. As issued, however, the 1942
of training capacity. Troop Basis included neither.8 But the
The 1941 Troop Basis in effect at the most astonishing deficiency of the program
outbreak of war embodied a troop program
6
Troop Unit Basis of the Signal Corps as of 28
4
By early February recommendations for re- December 1941 (continental limits of the United
vision of practically all Signal Corps tables of or-States). SigC 320.2 Gen 12, Oct-Dec 41.
7
ganization had either been made or were in process. Ltr, O/C War Plans Div OCSigO to All Brs
Signal Corps Information Letter, No. 3 (Feb 42), and Divs OCSigO, 24 Jan 42, sub: Troop unit
p. 39. basis for mob and tng, 1942. SigC 381 Gen (LG
5
Conf in OCSigO, 13 Aug 42, attended by rep- 381).
8
resentatives of OCSigO and Psychological War- Memo, Olmstead for Maj Gen George V.
fare Br, MIS. SigC 011-S Psychological War- Strong, 24 Mar 42, sub: Orgn of Sig bn for an
fare Br. army corps. SigC 320.3 T/O's 1940-43.
THE CALL FOR TROOPS 37
was its failure to include any troops at all craft warning battalions, separate; 19 signal
for the air arm. Toward the augmentation aircraft warning reporting companies, fron-
of Signal Corps overhead (i. e., the admin- tier; 69 signal platoons, air base; 80 signal
istrative positions in the War Department, platoons, air depot group; 7 signal com-
in field offices, and in other installations ex- panies, depot, aviation.10 This belated AWS
empt from corps area control), this 1942 troop basis added enormously to the tech-
Troop Basis also reckoned on the scheduled nical manpower requirements of the 1942
expansion of the ground forces alone, tak- mobilization plan; and yet there remained,
ing no account of the work which the Signal still unknown, the requirements for techni-
Corps would perform for the Army Air cians and specialists to man Signal Corps
Forces (AAF). 9 units serving the AAF as well as the AWS.
There were other weaknesses in the 1942 Such additional Signal Corps units—and
mobilization plan. From the time of its they numbered scores—grew without a
publication, revisions were frequent. It broad plan.11 Tentative authorizations in
ceased to be a forecast; in fact, it fell be- effect immediately after Pearl Harbor had
hind. Activation schedules out-distanced the called for 67,000 officers and enlisted men
parent plan, which served only weakly as to be procured and trained by the Signal
a training objective, being no better than Corps within a year for the Air Forces as a
any other plan of that time. In some ways whole.12 The lack of a firm troop basis for
its existence actually was a drawback, be- the air arm and the inadequacy of tables of
cause the General Staff adhered to it in organization for the ground forces handi-
limiting training capacity, yet often had to capped orderly planning. But even had sat-
ignore it when compelled to activate new isfactory tables of organization covering all
units. Therefore, commitments for signal units been in effect, there would still have
units exceeded the troop basis, were out of been the enormous task of converting civil-
step, irregular, and un-co-ordinated. Men ian recruits into military technicians within
in training, expecting to be assigned months a compressed length of time.
hence to units allowed under the troop basis, The Protective Mobilization Plan had
had to be assigned hurriedly, their training called for one million men by M Day plus
cut short, to meet task force activations or 120, all from the Regular Army, the Na-
other urgent calls. tional Guard, and the Reserve, and all with
It was well into January before Major some measure of military training. Actually,
Maude, in the Signal Corps' Air Communi-
Army strength, including Selective Service
cations Division, succeeded in getting from
men who had expected to return to civilian
G-3 a list of Signal Corps units authorized
for the Aircraft Warning Service, which
pursuits at the end of one year of service,
would serve as a troop basis of sorts for that had passed the million mark in March 1941,
service. The list included 7 signal head- 10
OCSigO R&W Action 1, Air Com Div to Mil
quarters and headquarters companies for Pers Div OCSigO, 17 Jan 42, sub: Distr of elec-
AWS interceptor commands; 23 signal tronics officers. SigC 320.2 Activation of Units
(MT-20) Jan-Jun 42.
aircraft warning regiments; 19 signal air- 11
There was no firm troop basis for signal units
for the AAF until 1943.
9 12
Memo, ACofS G-1 for CSigO, 17 Sep 41, sub: Summary of Authorizations, revised to 10 Dec
Augmented PMP 1942. SigC LG-381. 41. SigC SPSTP 5, PMP 1942.
38 THE SIGNAL CORPS
nine months before the declaration of war. In another effort to get men already
It continued steadily to increase. Augmen- trained in communications duties, the War
tations of the Protective Mobilization Plan Department had directed reception centers
were to have brought the Signal Corps to to allocate all branch immaterial recruits
a strength of 62,500 by M Day plus 360. who were radio engineers, electrical en-
Signal Corps strength passed that mark and gineers, or geophysicists, in the proportion
13
rose to 75,391 during February 1942. of 65 percent to the Signal Corps, 25 per-
cent to the Coast Artillery Corps, and 10
Plans for Getting Enlisted Men percent to the Army Air Forces. Few men
of this caliber were reaching the reception
"Good radio men are more precious than centers because before they were drafted as
nuggets in this Army. They are diamonds, enlisted men they were offered commissons
rated No. 1 on the list of 181 shortages."14 or were snapped up by essential industry.16
The process of sorting out such treasures or If they were about to be drafted, they could
of polishing potential gems remained one take advantage of the voluntary enlistments
of the most baffling of the Signal Corps' still being offered by the Navy, the Marine
many problems. There were only two ways Corps, and the Army Air Forces. Thus,
to get skilled signal soldiers. Either the Sig- many men whose abilities were in demand
nal Corps had to find men already trained could choose the branch of the armed forces
in communication techniques and put them in which they wanted to serve. Even the
into uniform, or, failing that, it had to take Signal Corps' own civilian employees often
soldiers potentially capable of absorbing found other fields greener. In consequence,
such training and teach them what they the Signal Corps' Army Command and
needed to know. Administrative Network (ACAN) system
The first possibility offered little hope. In suffered when many of its civilian operators
October 1941 the War Department had di- and maintenance men, whose skills were
rected the reception centers to send to the vital, volunteered for other services or trans-
Signal Corps any draftees who had formerly ferred into industry. In an attempt to hold
been employed in the engineering and plant them ACAN obtained 400 specialist grades
departments of commercial telephone and to offer in exchange for enlistment in the
telegraph companies. On 8 December the Signal Corps. But even this inducement was
order had been repeated. But these men to have little effect. By 10 April 1942, the
were few, and the Signal Corps actually re- limit set for enlistment under the authority,
ceived no more than about one out of each
fewer than 70 had taken advantage of the
six inducted.15 17
13
offer.
(1) Biennial Report of the Chief of Staff,
16
1941-43, p. 64. (2) Annual Report of the Secre- (1) AG Ltr to CG First Corps Area et al., 31
tary of the Army, 1948, p. 292. Dec 41, sub: Assignment of selectees. AG 341 (12-
14
Walter V. Bingham and James Rorty, "How 18-41) EC-A. (2) Ltr, CSigO to CG SOS, 11
the Army Sorts Its Manpower," Harper's Magazine, Nov 42, sub: Qualified enlisted pers for SigC.
185:1108 (September, 1942), 435. SigC MP 320.22 Requisitions Enlisted Men.
15 17
(1) Memo, Pers Div G-1 for CSigO, 8 Dec (1) Ltr, TAG to CSigO, 13 Jan 42, sub: En-
41; (2) Tab III of Tab D, Incl to Memo, Chief listment and promotion of certain SigC civ em-
of Mil Pers Div OCSigO for Deputy CSigO, 23 ployees; (2) Ltr, Col King, Chief of Mil Pers Div
Oct 42, sub: Pers rqmts. SigC 320.22 Enlisted OCSigO to Mil Pers Div SOS, 15 Oct 42, same
Strength MT-25. sub. SigC 220.1 (Gen) Appointments 1, 1940-43.
THE CALL FOR TROOPS 39
Not even the members of the Army Ama- for the organization of entire troop units
teur Radio System (AARS), established from the personnel of the sponsoring agen-
by the Signal Corps in the 1920's to sup- cies, as had been done in World War I
plement its own operating strength in an under a similar plan. The World War I
emergency, could be counted on. The ama- plan had provided badly needed telegraph
teurs were also excellent operators and battalions. But the concentration of many
maintenance men; most of them built their skilled men in them reduced the number
own sets. But they, too, were in high de- of specialists available to other Signal Corps
mand and unfortunately no provision had units. Moreover, the sudden withdrawal of
been made for channeling into the Signal large blocks of men from the private com-
Corps such members as might be subject panies had tended to disrupt civilian com-
to military service. When the government munications. More wisely, the new Affiliated
closed all amateur stations on 8 December Plan now gradually withdrew individual
1941, the Signal Corps lost touch with the officers and enlisted specialists from spon-
group which it had organized and trained soring civilian concerns in order to form
in military communications procedures. Of cadres for a large number of units, which
those who entered the Army not all served filled up their ranks from reception and re-
in the Signal Corps, and there was no way placement training centers. At the time of
of counting the number who did. Thus the Pearl Harbor, a ground force signal bat-
AARS plan, which had served adequately talion of 20 officers and 542 enlisted men
in peacetime emergencies, such as floods was entitled to an affiliated cadre of 11
and tornadoes, fell short of its full purpose officers and 13 noncommissioned officers
in war.18 and technicians of the fourth and fifth
The Signal Corps had another prewar grades, if the unit had been sponsored as an
design for obtaining experienced techni- affiliated organization. The strength of
cians, the Affiliated Plan, wherein the tele- cadres varied with the types of units and,
phone and motion picture industries and indeed, between units of the same type.19
the pigeon fanciers' associations had co- The 1942 requirements under the Affili-
operated toward putting skilled men into ated Plan called for 189 officers and 1,314
Signal Corps units. But the Affiliated Plan enlisted men to fill positions both in the
was not broad enough. Although it drew Office of the Chief Signal Officer and in
directly upon the main sources of wire and troop units. This number the Bell System
photographic specialists and pigeon experts, signified its willingness to provide. In addi-
it included no sources of radio skills. Also, tion to the units which the original plan
by its nature it could not be expected to listed, the Secretary of War had authorized
meet heavy current demands for very large the affiliation of eighteen more, for ten of
numbers of technicians. It did not provide which commercial sponsors had yet to be
18
FCC Order, 8 December 1941, closed all 19
(1) Donald S. Bridgman, "Skilled Manpower
amateur stations, although in the month following for the Signal Corps," Bell Telephone Magazine,
Pearl Harbor about 1,500 amateur stations were XXII (1943), 166. (2) Ruth F. Sadler, History
reopened for civilian defense service. These were of the Signal Corps Affiliated Plan (August, 1944),
finally closed on 9 January 1942. FCC-DCB order, SigC historical monograph C-4, Exhibit F. SigC
9 Jan 42. Hist Sec File.
40 THE SIGNAL CORPS
20
found. In February the War Department toward recruiting ready-made specialists in
authorized the affiliation of still more units, large numbers, a second possibility had to
such, for example, as the first affiliated Sig- be explored. If the Signal Corps could not
nal Photographic Companies, the 164th and get specialists ready to hand, it would have
165th, which the Research Council of the to take untrained men and make them spe-
Academy of Motion Picture Arts and cialists. That meant, first of all, getting men
Sciences sponsored.21 The first affiliated capable of absorbing the technical train-
cadre called to active duty as a unit was ing the Signal Corps would give them, then
that for the 99th Signal Battalion. The men months of preparation before they could
reported at Fort Monmouth on 28 Febru- become effective signal soldiers.
ary, and within three weeks were on their Conscription was bringing in a widening
way to the west coast where the 99th would stream of recruits, but the upsurge in num-
be activated.22 bers was falsely encouraging. The Signal
Thus, though nearly one third of all the Corps was receiving too many men not
Signal Corps troop units to be activated qualified to pursue the courses it offered,
during the war would be known as affili- too few who were. In normal times the
ated units, the affiliated leaven within them Army had required a recruit to have at
would represent only 1.7 percent of Signal least a high school education before en-
Corps peak strength. Over nine tenths of listing in the Signal Corps. But from the
this small percentage of affiliated officers arrival of almost the first Selective Service
and men would be wire specialists; fewer increments, Signal Corps officers in the field
than one tenth would be photographic tech- had protested that many were below that
nicians; and scarcely one out of each hun- standard. On the eve of war, five days be-
dred would be a pigeon specialist.23 fore the Japanese attack, Col. Otis K. Sadt-
Since all these plans proved ineffective ler, Chief of the Operations Branch, had
pleaded with G-1 to instruct reception cen-
20
(1) Ltr, Col Sadtler. OCSigO, to Col Carroll ters to send the Signal Corps only such men
O. Bickelhaupt, AT&T Co, 11 Dec 41; (2) Ltr, as were qualified to pursue technical study,
OCSigO to TAG, 11 Dec 41. sub: Affiliated posi- contending that "given a man of adequate
tions in SigC orgns, and 1st Ind, TAG to CSigO,
30 Dec 41; (3) Ltr, Keith McHugh, vice-president intelligence, the Signal Corps can train
AT&T Co, to Olmstead, 29 Dec 42. SigC 381 him." 24 But all the arms and services were
Affiliated Units, Dec 42. screaming the same plea and Sadtler's re-
21
Motion picture studios, even those not con-
nected with the academy, were eligible to nomi- quest fell on deafened ears. Moreover, req-
nate candidates for the affiliated positions which uisitions called for radio technicians at the
the academy sponsored. (1) Ltr, CSigO to TAG, rate of three and four times the number con-
18 Feb 42, sub: Affiliated positions in SigC orgns;
(2) Ltr, CSigO to TAG, 26 Feb 42, sub: Spon- templated in current training quotas. Of
sorship of affiliated SigC orgns. SigC 381 Affiliated all the warborn demands upon the Signal
Units, Feb 42. (3) Ltr, TAG to CSigO, 28 Feb Corps' meager supply of manpower, none
42. sub: Affiliated SigC orgns. AG 320.2 (2-4-42)
MR-M-AAF. were more immediate and pressing than
22
Cant Frederick Reinstein, Signal Corps Train- those of the Army Air Forces, particularly
ing in World War II: Background and First Six
24
Months of War, 1917-1942 (1944), SigC his- (1) Ltr, CO 310th Sig Co Avn to Sig Officer
torical monograph C-1, p. 162. SigC Hist Sec File. Northwest Air Dist, 1 Feb 41. SigC 201 Clarke,
23
Sadler, Hist of Signal Corps Affiliated Plan, Carter W. (2) Memo. Sadtler for ACofS G-1, 2
Exhibit G. Dec 41. SigC 352.12 (Psychological Tests).
THE CALL FOR TROOPS 41
for aircraft warning troops. Not only in the The Signal Corps felt that because of
United States but in every other area of these considerations and because of the gen-
conflict there was a demand for radar men. eral difficulty of the subject of electronics,
In February, the chief of the Military it ought to get men whose education and
Personnel Division, Col. Henry L. Page aptitude placed them in Class I of the
King, repeated Sadtler's December plea for AGCT, or in the upper half of Class II.
better "basics." The AAF had just indi- In arguing successfully for assignment of
cated informally that it would need some at least 75 percent of its recruits from
53,000 men for the Aircraft Warning Serv- among men rating 100 or more in the tests,
ice alone, and King asked specifically for the AAF had advanced as a reason its ex-
2,000 enlisted men from the top intelligence tensive use of radio.26 Yet the Signal Corps,
group for aircraft warning duty. G-1, be- engaged to a far greater extent in work on
sieged on all sides by similar demands, again a wider variety of more complicated items
sought to give equal consideration to "the of radio equipment, got men of lower
need for men of high intelligence in each ability.
branch of the service" and declined to limit The repeated rebuffs which the Signal
Signal Corps assignments to even Class IV Corps met as it sought to get better men
and better. Class IV stood just above the to train brought forth one plan after an-
bottom of the five grades of military apti- other for General Staff consideration. Three
tude in which the Army classified its men days before the reorganization of 9 March
according to the Army General Classifica- 1942, while the technical services could
tion Test (AGCT). 25 A grade of 100 was still deal directly with the source of allot-
taken to be the median. Yet among the ments of manpower and training capacity,
men arriving at replacement training cen- Colonel King went to G-1 again with what
ters were many whose AGCT scores fell was to be his most effective appeal. He had
far below 100, as well as some who had to been impressed by the fact that although
be taught to read and write. It would military training facilities could not be ex-
take an inordinate amount of time to make panded fast enough, civilian institutions,
even simple technicians of such men, if it which the war was emptying of students,
could be done at all. Even then they might did have space. He therefore requested au-
still lack resourcefulness and skill. Initiative thority to recruit men in the Enlisted Re-
and mental stamina were of prime impor- serve Corps (ERC) for preservice training
tance to Signal Corps men and to the suc- in the civilian schools. To his pleasure, G-1
cess of their missions, as units and small approved his request and the War Depart-
teams were frequently thrown on their own ment issued implementing orders.27
resources in areas remote from the main The approval of Colonel King's plan en-
body of the troops they served. abled the Chief Signal Officer to change
25 26
(1) Memo, King for ACofS G-1, 10 Feb 42, Memo, ACofAS for CofS, 24 Jan 42, sub:
and 1st Memo Ind, ACofS G-1 for CSigO, 12 Intel tests for Air Corps enlisted men prior to
Feb. 42. SigC 352.12 (Psychological Tests). (2) entry into the sv. 13190, OCS 12001 to 14000.
27
Robert R. Palmer, Bell I. Wiley, and William R. (1) Memo, King for ACofS G-1, 6 Mar 42;
Keast, The Procurement and Training of Ground (2) AG Ltr, 15 Mar 42, sub: Enlistment in ERC.
Combat Troops, UNITED STATES ARMY IN SigC MT 353 Staff Study ERC Tng MT-164,
WORLD WAR II (Washington, 1948), p. 6. Mar-Oct 42.
42 THE SIGNAL CORPS
requirements at his discretion, to set quotas listed reservists could be trained along with
for the various schools, to change them at the civilian technicians under the preservice
need, and to establish new courses as he saw civilian training program. Also, the civilian
fit. The plan directed corps area recruiting recruiting publicity could now be focused on
offices to test all applicants and to send those persuading men to enlist in the ERC for
qualified to the nearest civilian school. Tui- preinduction training.
tion for a period not to exceed six months Indeed, the recruiting campaign was also
was payable either from funds allocated to operating to bring men into the Army di-
the U. S. Office of Education or from money rectly for Signal Corps duty. The com-
under the control of the Chief Signal Officer. munications industry had a personal stake
If a student had enrolled in a course prior in seeing that members of its craft subject
to enlistment and had paid all or part of to conscription were placed in appropriate
his tuition, he was to be reimbursed upon Army positions. The industry therefore
enlistment in the ERC. He would be defer- showed a keen interest in recruiting. Large
red from active duty until completion of communications companies, Westinghouse,
the course. Then he would be called to Radio Corporation of America, and Gen-
active duty and sent to a Signal Corps re- eral Electric, searched their application files
placement training center or assigned to a for prospects for the Signal Corps. The
Signal Corps unit. In either event, these men civilian communications profession under-
selected to meet the Signal Corps' specifi- stood, as the layman and many a nontech-
cations would possess not only the mental nical Army officer did not, the prodigious
qualities the Signal Corps sought but a demands imposed by the Army's modern
measure of communications skill as well. signal systems. Engineering societies sought
The significance of King's plan lay not candidates within their membership. Radio
only in the fact that it was bigger than it studios made their facilities available for the
appeared to be but also in the fact that the Army to broadcast appeals. Prominent
Signal Corps would have unusual inde- actors and others in the public eye placed
pendence in administering it. Signal Corps before the people the urgent need for mili-
personnel and training officials were jubi- tary and civilian communications men of
lant ; previously they had estimated a short- all kinds, and for men qualified to study
age of 7,200 technicians in eight vital cate- the specialized subjects, whether at second-
gories by the end of June. Moreover, pro- ary or college level. Newspapers and maga-
curement schedules called for the delivery of zmes devoted space to the Signal Corps, its
369,694 radio sets of various kinds by the functions, its manpower needs. The radio
same time—841,560 by the end of 1942. amateurs' magazine, QST, appealed to li-
This created a need for almost 15,000 main- censed radio operators to join the Signal
tenance men by the end of June, and for Corps, "the only branch of the Army in
more than 50,000 six months later. About which by showing your amateur or com-
half the maintenance men would have to be mercial radio operator's license you may be
soldiers; half might be civilians.28 The en- assured of assignment to radio work." The
28
Table of Personnel Requirements for Mainte- editors added a timely caution, however,
nance, prepared 30 March 1942 from Current that not all recruiting officers understood
Schedules. SigC MT-353 Staff Study ERC Tng
MT-164. this. An article in QST seeking civilian me-
THE CALL FOR TROOPS 43
chanics for the Caribbean area told readers, opening for an automobile mechanic.30
"If you are looking for a late winter West Either way, the commander was quite cer-
Indies cruise, here it is." The needs of the tain to consider the man poorly trained for
Aircraft Radio Laboratory for engineering the job he held. The heart of the trouble
and subprofessional skills received publicity. was the circumstance that many command-
Radar service received attention in semi- ers were unfamiliar with the fact that sig-
techical articles, news items, and cartoons. nalmen came in many categories and that
"He's a Radar Man" was the caption under each was intended for a specific purpose.
a cartoon depicting an enlisted man strut- A commander might, for example, ask sim-
ting between two high-ranking officers. ply for a radio operator, when if what
Manufacturing companies lent their adver- he wanted was a fixed station operator he
tisements to the enlistment needs of the ought to have a skilled man and not simply
Signal Corps. The civilian commercial one who could send or receive only fifteen
words a minute.
schools which conducted preservice war
As a remedy, the Chief Signal Officer
training advertised their courses widely if
had initiated a campaign for educating
not always wisely.29 commanders in the relationship between
It was bad enough, the Signal Corps signal specialties and signal equipment.
felt, that so many of its plans to acquire From time to time he had issued lists de-
suitable men went awry. It was worse to signed to aid them in requisitioning the
know that many of the technicians and specialist they wanted; and the Signal Corps
specialists whom it had taught were sent also obtained permission from the War De-
out to be wasted on duties which demanded partment to substitute other men when
either more or less skill than they had ac- those in the categories called for were not
quired. The Signal Corps taught the men, available. By the time the war was halfway
but G-1, War Department General Staff, over, these innovations were so well thought
filled the requisitions for them. Therefore, of that the Services of Supply introduced
many requisitions were badly met by the the same procedures into the Signal Corps'
assignment of simple technicians, who had sister services.31 But in the early months of
1942 the gap between the supply of en-
received only general instruction in the re-
listed technicians and the demand for them
placement training centers.
had not been bridged. In March G-1 was
Hence, a company commander who had still assigning men—at times not even good
asked for highly trained radio repairmen substitutes—to apply on requisitions re-
and repeatermen might find he had re- ceived a month before Pearl Harbor.
ceived only linemen and truck drivers.
Much less often, the reverse occurred, and 30
Capt Wilson G. Burden, Signal Corps Enlisted
Administration (1945), App. IX. SigC Hist Sec
a skilled radio operator arrived to fill an
File.
31
29
(1) Memo, ACofS G-3 for TAG, 26 Nov 41,
(1) QST (February, 1942), pp. 42, 75; sub: Editing of SigC replacement requisitions. OCS
(March, 1942), pp. 25, 78; (April, 1942), p. 25. G-3/45082. (2) Ltr, CSigO to Fld Sig Officers, 3
(2) Radio News (June, 1942), p. 13. (3) Memo, Jun 42, sub: Requisitions for SigC specs on SigC
Maj John A. Holman for Lt Col Will V. Parker, RTC. SigC SPSMP 221 Specs. (3) AG Memo W
O/C Plant Div OCSigO, 23 Jan 42. SigC 322.08 615-67-43, 7 Sep 43, sub: Requisitions for replace-
PEA 1, Jul 40-Dec 42. ment of enlisted men. (4) WD Cir 149, 15 Apr 44.
44 THE SIGNAL CORPS
Plans for Getting Officers The Regular Army officers of the Signal
Corps approximated only a cadre for an
The 3,000 officers whom the Signal officer corps. The 225 on duty with troops
Corps had on active duty when war struck filled only 4.34 percent of troop demands
included most of its reserve, 40 called to for Signal Corps officers, as compared to the
duty under the Affiliated Plan, 335 newly 7.27 percent average for all ground arms
commissioned from its first officer candidate less the Signal Corps. For all other pur-
class, and some 300 Electronics Training poses the Corps had only about 100 Regu-
Group (ETG) officers in schools in the lar Army officers. To obtain Regular Army
32
United Kingdom. parity with the other arms, the Signal Corps
The officer corps was weak in leaders and asked for 142 additional Regular Army offi-
woefully weak in technical leaders. Al- cers. Instead of authorizing that number,
though the Reserve Corps lists still con- the General Staff approved an increase of
tained the names of some World War I 50, of whom 25 were to be from the In-
officers, many would no longer be able to fantry, 15 from the Cavalry, and 5 each
qualify physically for active duty, and only from the Field Artillery and Coast Artillery
a few of those eligible remained in an in- Corps.33
active status. The Reserve Officers Train- Had all of these new officers been signal
ing Corps would yield a few officers each specialists, there would still have been a
year, but only a few until the ROTC pro- very thin line of Regular Army officers to
gram should be revised to war scale; the lend their experience to the inexperienced
United States Military Academy, only a new officers. Fortunately, the largest con-
handful. The Affiliated Plan would provide centration of Signal Corps Regular Army
some under the schedule for spaced with- officers was in the grade of lieutenant colo-
drawal from industry. The Officer Candi- nel. Ninety officers had attained this perma-
date School (OCS), drawing its students nent rank. All had fairly broad experience,
from Army ranks (often taking badly and would have from five to fifteen years
needed Signal Corps enlisted technicians), to serve before reaching the normal retire-
would provide monthly increments of non- ment age. This one grade group therefore
technical officers under the existing capac- provided officers to fill some of the most im-
ity of 500 students. About 200 more second portant positions in the Signal Corps during
lieutenants would be commissioned from the war. Among them were Crawford,
civil life for the Electronics Training Group Sadtler, Milliken, Ingles, Mitchell, Farmer,
under the standing authorization. From all Code, Moran, Rumbough, Stoner, Rives,
sources within and without the Army, only Arnold, Lawton, King, Gardner, Watson,
5,735 officers would become available to Matejka, Reeder, Black, Back, and others
the Signal Corps by the end of 1942. This who served in key field and administrative
number, even when measured against the 33
(1) Incl, Tab A, with Memo, Chief of Mil
short yardstick of that day, fell 1,407 below Pers Br OCSigO for Deputy CSigO, 23 Oct 42,
estimated requirements, with the real needs sub: Pers rqmts. SigC 320.22 Enlisted Strength
(MT-25). (2) Memo, CSigO for ACofS G-1, 12
of the future as yet to be revealed. Dec 41, and 1st Ind, TAG, 24 Dec 42. (3) Memo,
ACofS, 22 Jan 42, sub: Officer pers for SigC, with
32
For the background of the ETG officer pro- approval by SW, 30 Jan 42. G-1/13864-672, OCS
gram, see Terrett, The Emergency, pp. 288-91. 20605-39 to 20697-15.
THE CALL FOR TROOPS 45
assignments. These and the few other Regu- Meanwhile, the Signal Corps found it
lar Army and reserve officers of field grade difficult to locate men in civil life who were
carried the chief responsibility of placing the qualified to meet its exacting standards for
Signal Corps on a war footing. The ma- electronics officers. There were too few men
chinery in motion to increase the Corps' of appropriate caliber engaged in commu-
commissioned strength would, in the main, nications pursuits to supervise civilian and
bring in only company grade officers, many military communications networks of the
of them on the bottom rung as second normal kind under the increased demands
lieutenants. of war. Beyond these needs were the re-
To avoid the shortage which it was esti- quirements in a little known and far more
mated would exist by the end of 1942, Col- complex field where highly secret military
onel King asked the General Staff soon developments had barely charted the course
after Pearl Harbor for authority to commis- that the enormous aircraft warning opera-
sion 1,407 qualified men directly from civil tion would follow. The techniques involved,
life, as the quickest way to get officers tech- new to the Army, had no commercial ap-
nically qualified for Signal Corps duty. plication; the equipment no commercial
The War Department authorized the di- counterpart. Consequently, no military or
rect commissioning of another 500 only, all civilian sources of skill had been built up.
for the Electronics Training Group, but did Yet a degree in electrical engineering or
raise the capacity of the Officer Candidate physics was an essential preliminary for a
School from 500 to 2,000.34 By January potential Aircraft Warning Service officer.
1942 requirements shot far ahead of the By this time, most of the students about to
December estimates. Eight thousand com- graduate in electrical engineering were
pany officers alone would be needed. Ac- already committed to industry or to one of
cording to G-3's unofficial troop basis for the other services. The Signal Corps did,
the AAF, that arm would itself need 1,667 however, obtain permission to take students
officers with an electronics education and in either their junior or senior years into
would have to have them before the end the ERC, and upon their graduation to com-
of 1942. A month later this estimate was mission them in the Army of the United
boosted to 2,400 and the deadline moved States.36
to the end of September.35 For many months Courses in very high frequency subjects
to come the need for greater numbers of (called Ultrahigh at that date) were essen-
officers would persist and persist ureentlv. tial as a foundation for advanced Army
34
training in electronics. But such courses
(1) Ltr, CSigO to TAG, 15 Dec 41, and 1st
Ind, TAG to CSigO, 8 Jan 42, sub: Pers rqmts. were being taught in only a few electrical
AG 210.1 SigC (12-15-41) BE-A. (2) Memo, engineering schools and in those schools they
King for Deputy CSigO, 23 Oct 42, sub: Pers had been taught only in the past ten years
rqmts, and Incls Tabs A to D inclusive. SigC
320.22 Enlisted Strength, Oct 42 (MT-25). 36
35
(1) OCSigO R&W Action 1, Maj Maude to (1) Memo, Capt H. K. Horning for Chief of
Mil Pers Div SigC, 17 Jan 42, sub: Distr of elec- Opns Br OCSigO, 4 Feb 42, sub: Weekly Rpt, 26
tronics officers. SigC 320.2 Activation of Units Jan-1 Feb 42. SigC 319.1 Weekly Proj Rpts, Opns
(MT-20) Jan-Jun 42. (2) Memo, ACofS G-1 Br. (2) CSigO, Annual Report, 1943, pp. 116-17.
for CofS, 17 Feb 42, sub: Commissioning of elec- (3) OCSigO R&W Action 3, Capt J. S. Vaughan,
tronics students in SigC. G-1/8165-935, OCS Mil Pers Div, to Chief of Opns Br, 5 Mar 42.
20605-39 to 20697-15. SigC 353 Gen Feb 42-Aug 42, MT-40.
46 THE SIGNAL CORPS
or less. Of the 21,000 men estimated to While the Personnel Division struggled
have graduated in electrical engineering in to bring in officer timber from the civilian
the decade preceding 1942, only a small forests without, the sources within the Army
proportion had taken the new courses. and the Signal Corps itself slowly yielded
This unknown fraction constituted the na- further numbers. On 13 January a call
tion's main supply of manpower for the went out for the few Signal reserve officers
commercial and military research in elec- remaining on an inactive status.40 The War
tronics, for the production of equipment, Department released some officers from its
and—this being the vital necessity to the Reserve pool, whence the Signal Corps ob-
Army—for the intelligent use of radar in tained a number of very well qualified spe-
the war.37 cialists.41 The 173 graduates of the second
In selecting the first 500 officers for the officer candidate class received commissions
Electronics Training Group, the Personnel as second lieutenants in January. Later in
Division reviewed and replied to an esti- the month the Secretary of War again
mated 10,000 applications, coming in at raised the capacity of the school, this time
the rate of about 50 a day, in order to find to 3,000, and opened officer candidate
some 1,500 that warranted serious consid- schools of all arms to qualified soldiers who
eration. Of these, 600 applicants lacked an would be not under 18 nor over 45 years
adequate technical education, 112 were old upon graduation, and who would have
physically disqualified, and 276 eventually had not less than three months of continu-
declined the appointments tendered them.38 ous service on beginning the course or six
By January 1942, seven months after the months of cumulative service within the
42
War Department had authorized the first year immediately preceding enrollment.
500 appointments, the Signal Corps had This eased the situation slightly but the
been unable to commission the full num- amount of technical training these officers
ber. In February the War Department was would receive in OCS would not in itself
forced to relax the requirements, extending qualify them as communications specialists.
the original limitation (ages 21 to 36, un- Therefore the shortage in this category per-
married, and without dependents) to ages sisted.
18 to 46, regardless of marital status or The Chief Signal Officer considered it
dependents.39 Even then many of the appli- essential that all Signal Corps officers as-
cants accepted had to be given preliminary signed to tactical Signal Corps units be tech-
instruction before pursuing the advanced nically qualified signal communications
electronics courses. specialists. Late in January he repeated a
recommendation he had made before Pearl
37
(1) Memo cited n. 3 5 ( 2 ) . (2) Memo, Wil- Harbor that educational standards for en-
liam Hotchkiss for Dir Gen Davis (Army Spec tering the Signal Corps Officer Candidate
Corps), 8 Jul 42, sub: Needs of Army svs for offi-
40
cers both in AUS and ASC. SigC 210.2 ASC. AG Ltr, 13 Jan 42, sub: Res officers for as-
38
Memo, King for Chief of Opns Br OCSigO, signment to SigC pool. AG 210.313 Sig Res (1-1-
20 Feb 42. SigC 201 Code, James A. 42) RO.
39 41
(1) Ltr, CSigO to TAG, 15 Dec 41, sub: Ap- Signal Corps Information Letter, No. 3 (Feb
pointment of 2d lts, and 1st Ind, TAG to CSigO, 4 2 ) , p. 56.
42
8 Jan 42. AG 210.1 SigC (12-15-41) BE-A. (2) Memo, CSigO for ACofS G-1, 15 Jan 42, sub:
AG Ltr, 17 Feb 42, sub: Appointment of 2d Its, Officer candidates. SigC 210.632 Ft. Monmouth 5,
AWS. SigC 210.1 SigC (2-12-42). 1941, 4-30-43.
THE CALL FOR TROOPS 47
School be revised to require an engineering basic students and 1,500 of the 2,000 ad-
degree or its equivalent in experience.43 vanced would have to be trained in new
Having exhausted every immediate ROTC units.45
source of officer material, the Signal Corps The General Staff viewed the proposal
now urged the expansion of the existing with disfavor. The Signal Corps wanted
ROTC units and the establishment of still ROTC officers because it saw in them a
others. When war began, 1,450 basic and source of skilled technical officers, ade-
350 advanced students were enrolled in the quately trained in their specialities through
11 Signal Corps units at good engineering good university courses. At the institutions
schools throughout the country.44 Although having ROTC units, the courses in mili-
they constituted a deferred class under the tary science were an integral part of the
Selective Service Act, the Signal Corps educational program. The ROTC gradu-
would not get all these officers. In 1941 ates were, in general, interested in things
only 147, fewer than half the students in military. When commissioned, they were
the advanced units, had been commissioned ready almost immediately to step into tech-
or certified for commissioning. nical positions or to pursue advanced elec-
King estimated that the Signal Corps tronics study, as the average officer candi-
would now need 800 second lieutenants date was not. Yet G-1 opposed them on the
yearly from the ROTC, not counting com- ground that they were not sufficiently
bat losses. To provide a margin for these, trained as leaders. The ground forces felt
he added 25 percent and arrived at 1,000 that three months of officer candidate school
as the goal. If the 1941 experience were training turned out far superior officers.
typical, in order to get 1,000 he would have This concept imposed upon the Signal
to assume a pool of twice as many. He there- Corps the characteristics of the nontechni-
fore asked for an annual quota of 2,000 cal bulk of the Army, wherein general
ROTC advanced students. Two thousand leadership was of more value than speciali-
students in the senior year was a figure im- zation, which was the core of communica-
plying an equal number in each of the three tions competence.46
preceding years, so that the ultimate quota Meanwhile, some minor concessions were
arrived at was 6,000 basic students for Sig- granted during the first two months of 1942
nal Corps ROTC training, as well as the to strengthen the intake from the ROTC.
2,000 advanced. Four thousand of the 6,000 In order to keep the existing units effectively
filled, the professors of military science and
43
Memo, CSigO for ACofS G-3, 27 Jan 42. tactics at the various universities received
SigC EO 4-9 No. 2, Equip and Movement Orders,
North African Theater, 1942-43 (60.2 Liberia- authority to reject any student who could
Air). not pass the physical examination which the
44
The schools were the Massachusetts Institute
of Technology, Cornell University, the Carnegie Officers' Reserve Corps required.47 A few
Institute of Technology, the Georgia School of
45
Technology, Ohio State University, the Universities Ltr, CSigO to TAG, 24 Jan 42, sub: Expan-
of Michigan, Wisconsin, Illinois, Minnesota, and sion of SigC ROTC units. SigC 320.22 Enlisted
California, and the Agricultural and Mechanical Strength, Oct 42 (MT-25).
46
College of Texas. The ROTC unit at Illinois also Incl, Tab D, with Memo, King for Deputy
offered an advanced course in Cryptanalysis. CSigO, 23 Oct 42, sub: Pers rqmts. SigC 320.22
OCSigO MT Div, Unit Tng Subsec Diary, 12 Feb Rqmts Enlisted Men, MP to Dec 42.
47
42. SigC Hist Sec File. WD Cir 18, Sec. II, 22 Jan 42.
48 THE SIGNAL CORPS
weeks later the War Department approved distribution.50 Some flexibility was achieved
with reservations a Signal Corps request in February when the War Department in-
that ROTC graduates completing ultra- creased the size of the Signal Corps' officer
high frequency courses be given an oppor- pool. Hitherto, the figure had been set at 500
tunity to enter the Signal Corps even if the for the Signal Corps School and 150 for the
unit in which they had been trained was not replacement training centers at Fort Mon-
a signal unit. But there remained in effect mouth and at Camp Crowder. Now it rose
the prewar ruling that limited the Signal to 1,650, without restriction as to grade,
Corps to not more than 10 percent of all and permitted the assignment of pool of-
ROTC graduates and specifically prohib- ficers of all arms, including the Signal Corps,
ited to it any men trained in Ordnance, En- to administrative positions as well as to
gineer, Chemical Warfare, and Quarter- troops.51
master Corps units.48 By the end of February 1942, Signal
Yet another stubborn problem arose in Corps officers on assignments (excluding
those in schools) numbered 5,247. About
the form of efficient assignment of officers,
one in five was on duty with the Air Corps.
or something approaching appropriate
Of the remainder, 252 were overseas; 765
placing of them. Although a board had been
served with troop units within the continen-
set up at Fort Monmouth in January 1942,
both to observe the student officers there
tal United States; 355 were assigned to corps
and to classify them carefully with a view area commands; and 2,852 were in War
Department overhead positions. Over half
to the best possible use of them, the effort
the Signal Corps' officers were engaged in
was largely guesswork because there was no
administrative duties.52 Every month's total
classification pattern to follow.49 Neither
could unit commanders submit an intelli- showed that the number of officers was in-
creasing. There were far more each month
gent request for an officer without going
than there had been the month before. Yet
into considerable detail as to the work he
the war had so widened in area and so
would be expected to perform. The obvious
solution was to develop and adopt a system mounted in intensity that the calls from
every quarter grew more numerous and
for officers such as the one that already
more urgent than they had ever been. Thus,
existed for enlisted specialists. It must be
paradoxically, the shortage of officers re-
broad enough to take in officers for tactical
mained acute, however fast the production
units, for replacement training centers, for
schools and laboratories, and for other Sig-
lines turned them out.
nal Corps activities like procurement and 50
(1) SigC Bd Case 470. (2) WD Cir 301, 5
Sep 42, sub: SigC job specifications and specifica-
48
(1) Memo, ACofS G-1 for CofS, 17 Feb 42, tion serial nos. SigC 230 Classification of SigC
sub: Commissioning of electronics students in SigC; Officers.
51
(2) AG Ltr, 5 Sep 41, sub: Instructions governing AG Ltr, 20 Feb 42, sub: Officer filler and loss
commissions of ROTC graduates in arms and svs replacements. AG 320.2 (2-14-42) OP-A-M.
52
other than those in which trained. AG 210.1 ORC (1) SigC File Mil Pers Info as of 28 Feb 42,
(7-18-41). passim. SigC SPSTP 14. (2) Incl, Tab A, with
49
Ltr, CSigO to Comdt SigC School, 29 Jan 42, Memo, King for Deputy CSigO, 23 Oct 42, sub:
sub: Bd of officers for replacement pool. SigC Ft. Pers rqmts. SigC 320.22 Enlisted Strength, Oct
Monmouth 1, Jan-May 42. 42 (MT-25).
THE CALL FOR TROOPS 49
Getting Civilians other for 564, and then still another for
661, so fast were things growing.54
With the onset of war, the Signal Corps In the rest of the Office of the Chief Sig-
for the first time in a quarter of a century nal Officer and in every field installation,
had enough money to hire all of the civilian stenographers, clerks, and specialists of
workers it wanted, together with blanket various sorts were being similarly em-
authority from the War Department to ployed—often in greater numbers than
53
employ them without prior approval. In could be assimilated. Interviews were per-
common with other branches of the armed functory, assignment was undiscriminat-
forces, with the rest of the government, and ing, and supervisors were not always
with the great hives of industry which were competent to set tasks and to measure per-
being federally subsidized, the Signal Corps formance. Efficient workers tired of medi-
began to hire multitudes of men and ocre jobs. Less efficient workers held on
women, not solely to cope with multiply- to jobs too big for them. To provide an
ing work loads but also to attempt to com- agency to take a personal interest in new-
pensate for downward trends in office skills. comers, particularly the hundreds of young
Roughly guessing that it would take two women who were away from their homes
unskilled employees to do the work of one for the first time, a Counseling and Recre-
who was experienced, and taking into ac- ation Section was added to the Civilian
count the time lag between a requisition and Personnel Branch.55
its approval, Signal Corps administrators Malassignment was sometimes ludicrous.
gave free rein to imagination; and person- A clerk, for example, charged with the task
nel estimates zoomed. of passing upon applicants for the Electron-
The Military Personnel Division pre- ics Training Group did not know enough
sented a more or less typical picture. When about college courses to identify those lead-
Colonel King had left it in 1938, there had ing to degrees in electrical engineering and
been a staff of 1 officer and 3 civilians. Re- consequently accepted veterinary and law
turning in October 1941, he had found 8 students along with the prospective engi-
officers and 31 civilians. A tenfold expan- neers.56 The promotion of clerks to minor
sion seemed enormous, but it was not supervisory positions caused dissatisfaction.
enough after Pearl Harbor. In January Today's new employee became tomorrow's
1942 King asked for 191 more civilians, supervisor, sometimes when his lack of
ranging in grade from CAF-2 to a hither- training or experience for the job was all
to unthought of CAF-12. Because the Civil too obvious to those working under him.
Service Commission endeavored to control 54
(1) Capt Wilson G. Burden, Signal Corps
the overgrading of positions, he had to jus- Military Personnel Branch, Functions and Opera-
tify the higher grades by increasing the tions, passim. OCSigO Career Mgmt Br File. (2)
number of office units and thereby indicat- Memo, Chief of Mil Pers Br for Chief of Sig Opns
Sv, OCSigO, 2 Apr 43, sub: Size of Mil Pers Br
ing the need for greater numbers of super- OCSigO; (3) OCSigO R&W Exec Officer to Dir
visors. Even before he got the additional of Sig Troops Div, 30 Mar 43, sub: Officer posi-
tions in OCSigO. SigC SPSMP 320.2.
191, he had to follow that request with an- 55
CSigO, Annual Report, 1942, p. 136.
56
Maj John F. Bullock, Direct Commissioning
53
Signal Corps Information Letter No. 2 (1 Jan- of Signal Corps Officers (1945), p. 15. OCSigO
uary 1942), p. 19. Career Mgmt Br File.
264-211 0 - 7 8 - 5
50 THE SIGNAL CORPS
Proselytizing between divisions and super- by most men, nor even by some radio en-
visors was common. Within the next year, gineers.59 In the case of skilled workers, it
the turnover reached 60, 70, 80, and some- was certainly not true that bucketfuls of
times 100 percent.57 money would solve the hiring problem.
Like the Regular Army, the permanent At the beginning of 1942, the Signal
civilian force was very small, even in the Corps had 966 engineers and 690 subpro-
early months of 1942, and in comparative fessional employees. The estimated need by
size it continued to dwindle until almost the end of the year was for 4,580 engineers
submerged under the influx. Thus the ad- and 1,866 subprofessional workers, with an
ministrative complex turned topsy-turvy, additional 20,000 enrolled in radio repair
with many a greenhorn directing employees and other subprofessional courses in civilian
who had been trained for years in Signal institutions.60 Milliken, Lattin, Heath, Lan-
Corps procedures. In February, with ex- ahan, Rooks, and Maude, when considering
perienced supervisors scarce, organizational the specific problem of how many to hire
changes common, and office procedures a for maintaining radar detector equipment,
mystery to the newly arriving personnel, compromised at one technician for each 50
Col. Charles E. Saltzman of the Executive sets, which would require the employment
Control Division suggested—without much of 5,000 civilian maintenance men by the
effect—a redistribution so that each division end of June and 5,740 within the next
might have knowledgeable persons in at fiscal year. This was all a guess, of course,
least a few key positions. He also proposed because radar maintenance had never been
the assignment of a civilian assistant to each required before. But the Western Defense
major subdivision of the Chief's Office, to Command, with 88 sets, had only one main-
follow administrative problems through, tenance man, and the repair work was not
"wherever the ramifications of their investi- getting done. Obviously more men were
gation take them, until a satisfactory solu- needed. As for the overseas demand, all
tion to the assigned task has been arrived that the Signal Corps could do was to dele-
58
at." Such a force of trouble shooters, dis- gate authority to department signal officers
engaged from the paper work under which to employ as many maintenance men as
most administrators were buried, might
they wanted—if they could find them.61
have accomplished a great saving.
Daily it was becoming more apparent 59
(1) Incl 1, Notes on Instl, Maint and Repair
that quality and not quantity was the key to of Special Airborne Radio Equip, to Ltr, Lt Col
John H. Gardner, Dir of ARL, to CSigO, 17 Dec
efficiency, and the civilian as well as mili- 41, sub: Test equip for SCR-521 and SCR-540;
tary personnel would have to be trained for (2) Ltr, Gardner to CSigO, 3 Feb 42, sub: Sv and
the tasks awaiting them. This fact was nota- maint of Airborne Radar Equip. SigC 352 SSCS
bly clear in the hiring of civilian technicians. MT-32.
60
Signal Corps Requirements for Technical Per-
The understanding of radar equipment, to sonnel, Superseding Report of 10 January, dated
cite but a single example, certainly required 14 January 1942. SigC Central File.
61
specific knowledge which was not possessed (1) Memo for red, Maj Maude, 17 Jan 42,
sub: Conf ref civ engrs and mechanics for Maint
57
Civilian Personnel Survey of Signal Troops Di- Div; (2) Ltr, CSigO to Sig Officer, Air Sv Comd,
vision, OCSigO, 16 Jan 43. SigC Hist Sec File. Wright Fld, Dayton, Ohio, 22 Dec 41, sub: Maint
58
Exec Control Div OCSigO, Supplement to An- of radio sets SCR-270; (3) Memo, Lt Col John
nex 8, 16 Feb 42 (to biweekly OCSigO Achieve- M. Heath for Air Com Div, 26 Dec 41. SigC 320.2
ments or Prog Rpt). SigC EC 319.1 Prog Annexes. Gen 1, Jan-Feb 42.
THE CALL FOR TROOPS 51
some poorly trained technicians and some and went in shifts, day and night. But bar-
often untrainable basics. racks space was the bottleneck and General
In order to raise the proportion of skilled Olmstead was unwilling to resort to bunking
men in signal units, the Signal Corps School shifts. Additional students could be accom-
had always set aside space for quotas of modated only by putting 70 men in each
students to be selected by field commanders 63-man barracks. The War Department
from men possessing aptitude and back- had authorized that, but had cautioned that
ground for communications study, but after should respiratory diseases become epi-
war made manpower scarce throughout the demic, the post would be required to return
Army the policy failed for lack of students. to normal housing.
Field commanders would release few men, The New Jersey National Guard en-
even temporarily, to the Monmouth school. campment site at Sea Girt, only a few miles
There was always the possibility, they rea- distant from Fort Monmouth, provided the
soned optimistically, that when a unit was space for expansion. In January 1942 the
alerted for overseas movement, somehow Signal Corps leased the site from the state
the Signal Corps would supply the techni- of New Jersey at a cost of $125 a day—
cians. The Air Corps, whose requirements power, water, and gas included. Fortu-
for specialists were heaviest, was the worst nately, the camp already had twenty-two
offender. In this situation, the Signal Corps mess halls in which 1,700 men could be
now had no recourse but to fill its school to seated, a small post exchange, a large head-
capacity from its own replacement training quarters building, three stables which could
center intake, culling out the better quali- be made into classrooms, a motor shop, a
fied recruits at the end of basic training for fireproof warehouse, drill grounds, and so
enrollment in the longer school courses in on. It also had an excellent target range. All
the more critical specialties. Replacement of this admirably suited the needs of the re-
training center courses were accordingly lim- placement training center for receiving re-
ited to the simpler technical subjects which cruits and administering basic military
could be taught in less time. Thus a greater training. 66
number of recruits could be given a modi- With the transfer of this activity to Sea
cum of technical training.65 Girt (Camp Edison) space would be avail-
The January increase in school capacity able on the Fort Monmouth reservation for
carried with it an authorization for theater- the expansion of the school. The new facili-
type construction to house an additional ties and the decision not to duplicate in the
3,000 men. But Fort Monmouth, thickly training center any course taught in the
dotted with temporary buildings, was school would enable the former to turn out
hedged by populous New Jersey commu- an estimated 26,502 simple technicians by
nities. There was no room to expand. The the end of 1942.
post already occupied two and a half times Instructors accordingly rearranged sched-
its peacetime area. Classrooms served their ules and accelerated the pace. The replace-
purpose continuously as the students came 66
(1) Ltr, CSigO to CG SCRTC. Ft. Monmouth,
4 Jan 42. sub: Expansion of SigC RTC. SigC 353
65
Memo, Dir of Sig Opns Sv OCSigO for Dir of SCRTC Ft. Monmouth. (2) Memo, ACofS G-3 for
Sig Supply Sv OCSigO. 7 Sep 42, sub: Spec tng for CSigO. 15 Tan 42. sub: Mob and tng plan 1942.
SigC specs. SigC SPSTP 5 Misc. SigC MP 370.01 Mob.
THE CALL FOR TROOPS 53
ment training center set up classes for Sat- training center, assisted by Lt. Col. Robert
urday mornings and reviews for Saturday A. Willard, executive officer, Lt. Col. R. P.
afternoons. Courses for administrative per- Lyman, plans and training officer, and
sonnel, supply and warehouse clerks, truck Capt. J. A. Joseph, adjutant. 09 The site of
drivers, and aircraft warning plotters were Camp Crowder, originally intended as a
reduced to nine weeks; for message center joint Infantry-Signal Corps training facil-
clerks, linemen, local battery switchboard ity, had been turned over to the Signal
operators, messengers, and telegraph printer Corps, except for space for four Engineer
operators to 11 weeks; for automobile me- regiments to be trained there. The acquisi-
chanics, cooks, permanent linemen, ad- tion of the Infantry's buildings necessitated
vanced switchboard operators, code clerks, rearrangements in the use of space and some
aircraft warning operators, photographers, structural alterations to make the buildings
pigeoneers, and field radio operators to 13 suitable for Signal Corps use as classrooms.
weeks. The field radio operators were sup- On 15 February 1942 the first troops ar-
posed to get their training through troop rived for training. Classes began four days
instructions in the field.67 But so great was later, conducted by instructors drawn for
the shortage of radio equipment issued to the most part from Fort Monmouth. The
troops that the replacement training center recruits were divided among the twenty-
had to teach the subject in its classrooms. four courses which constituted the replace-
Selected recruits took only basic training ment training center's training program.
and then went into the more specialized The largest class would be for truck drivers
courses in the Signal Corps School; 16-week (1,619 students), the next largest for air-
courses for cable splicers, framemen, inside- craft warning operators (1,319 students).
men, installer-repairmen, powermen, and Other large classes were for field linemen
cyptanalytic clerks; 20-week courses for (1,099 students) and for field radio op-
radio electricians, switchboard installers, erators (1,022 students). The remaining
telegraph printer maintenance men, wire classes averaged about 350 students each.
chiefs, and fixed station radio operators.68 The courses did not differ essentially from
Another even larger replacement train- those at Fort Monmouth. At the end of
ing center was taking shape at Camp basic training the recruit progressed to the
Crowder, Missouri, in the foothills of the specialist phase, in which he studied the
Ozark Mountains, under the supervision of subjects for which his civilian experience,
Brig. Gen. William S. Rumbough, com- education, and aptitude presumably best
mander of the camp and the replacement fitted him. Men qualified for study in ad-
vanced specialties were enrolled in the Sig-
67
Mobilization Training Program 11—1, issued in nal Corps School at Fort Monmouth. As yet
January 1942.
68
there was no advanced school at Camp
(1) Ltr, CSigO to CG SCRTC, Ft. Monmouth, Crowder, although one was in prospect.
19 Jan 42, sub: Shortening of courses of instruction
SCRTC. SigC 353 Ft. Monmouth (RTC) 1, Jan- The first recruits at Camp Crowder gave
Apr 42. (2) Memo, Capt Vaughan for Chief of the Signal Corps little cause for enthusiasm,
Mil Pers Br OCSigO, 16 Mar 42, and 2 Incls.
SigC 320.2 Gen 2, Mar-May 42. (3) Incl, Tab B, since the caliber of many of the men fell
with Memo, Chief of Mil Pers Br for Deputy
69
CSigO, 23 Oct 42, sub: Pers rqmts. SigC 320.22 Reinstein, Signal Corps Training in World War
Enlisted Strength, Oct 42 (MT-25). II, p. 185.
54 THE SIGNAL CORPS
below the standard for specialist training. ing. On 19 January 1942 the Secretary
They proved to be of only slightly higher of War approved the revised plan, and a
aptitude than the men the War Department month later the new establishment, Camp
normally expected to receive at any of its Murphy, was under construction at Hobe
reception centers, as well as below the al- Sound, Florida.73
ready too low average which currently pre- Pre-Pearl Harbor plans had also pro-
vailed at Fort Monmouth.70 In some of the vided for an aircraft warning unit train-
contingents that arrived at Camp Crowder ing center at Drew Field, Florida, under
before the Army had established effective the III Interceptor Command, which would
criteria for selecting men for the Signal in effect be a finishing school for the stu-
Corps, as many as 40 percent were scarcely dents from Camp Murphy. Out of neces-
capable of learning the skills and tech- sity, however, Radio "A" school at Drew
niques which modern communications Field had sprung into being soon after
work involves.71 Some of these were trained Pearl Harbor before the school at Hobe
as linemen and truck drivers, but most had Sound had been authorized. It offered
to be shipped out as basics. rather sketchy training to information cen-
Just as replacement training center ac- ter technicians, radio operators, and admin-
tivities had outgrown the parent post of istrative clerks.74
Fort Monmouth, aircraft warning training On 15 January 1942 Lt. Col. Benja-
could no longer be held within its borders. min Stern, signal officer of the III Inter-
Plans for a joint Signal Corps-Coast Artil- ceptor Command, went to Washington to
lery Corps-Air Corps school in the south— attend an Air Corps conference on the
where year-round training would be feasi- training of radar specialists. Out of that
ble and where military airplanes and surface conference grew the Radio "B" or radar
craft plying their normal trade would pro- department of the Drew Field school, which
vide live targets for radar detection prac- still had no official standing. The Army
tice—had been under consideration in the Air Forces considered it to be their school;
War Department since the preceding the Chief Signal Officer thought of it as
July,72 but up to the beginning of 1942 the belonging to the Signal Corps. However
General Staff had not authorized its es- that might be, the first radar class began
tablishment. A G-3 conference late in No- its training on 2 February with 202 stu-
vember 1941 had brought the proposal out dents and "three SCR-270-B units, three
of its pigeonhole and thrown it back to the hospital ward tents, and a few pyramidal
Signal Corps for the preparation of a de- tents." Training aids were blackboards, cir-
tailed plan for a joint Signal Corps-Coast cuit diagrams provided by the aircraft
warning units, instructors' notebooks, and
Artillery School to be operated by the Sig-
nal Corps, apart from Air Corps radar train- 73
Named for Lt. Col. William Herbert Murphy,
who had been shot down by the enemy during a
70
Special Inspec SCRTC, Camp Crowder, by flight over the Netherlands Indies on 3 February
ICD, 8 May 42. 1942. He had pioneered in military radio develop-
71
Col Robert G. Swift, "The Crowder Story," ments, particularly the radio beam. CSigO, Annual
Signals, II (November-December 1947), 27. Report, 1942, p. 187.
72 74
Ltr, TAG to CSigO and others, 19 Jan 42, History of 2d Training Battalion (formerly
and 1st Ind, CSigO to TAG, 24 Jan 42. AG 352 588th Sig AW Bn) Third Air Force, Oct 43, App.
(7-22-41) MSC-C-M. I. AF Archives Sig-2-HI.
THE CALL FOR TROOPS 55
some obsolete commercial communications Corps School, nor did they get any appreci-
items. That was all until late in February able training as communications technicians
when six SCR-270-A's were sent down in AAF schools. Consequently, many a Sig-
from Fort Dix, New Jersey. These were not nal Corps unit with the AAF, which should
in working order but at least the students have been filled with qualified technicians,
could study the parts. As instructors this was actually so top-heavy with nonspecial-
group utilized six officers and thirty-six en- ists that it was not competent to perform
listed men who had had some experience signal duties. By the end of March, the
with radar, either at Fort Monmouth or Signal Corps units serving with the air arm
in the field.75 contained more than 19,000 nonspecialists
Until aircraft warning training should above the number contemplated.79 It was
be firmly established on a large scale in obvious that task force commitments could
Florida, the Aircraft Warning Department be met only by the assignment of units con-
of the Signal Corps School at Monmouth taining a mere skeleton cadre of specialists—
was doing all it could to relieve the shortage a minimum of men who had received barely
of trained men. New classes were embark- enough instruction to enable them, once ar-
ing each week upon radar maintenance rived in the theater of operations, to con-
courses but the students were too few.76 The tinue the training they would have to
number dropped from 318 in January and experience and would have to impart to
February to 100 in March.77 The Coast others before their organizations could
Artillery ceased altogether sending students qualify as efficient operating units. This was
after 21 February 1942, and the Air Forces a point on which Brig. Gen. Harry L.
Combat Command sent students to only one Twaddle, the Assistant Chief of Staff, G-3,
of six classes during the period 7 March-11 the Air Forces, and the Signal Corps were
April.78 in agreement.80
The Army Air Forces filled Signal Corps Thus many of the men who left the
units assigned to it from allotments of un- United States in the early winter months of
trained men granted by the General Staff, 1942 to serve in Signal Corps units accom-
and organized and altered the units, some- panying the first task forces could not be
times without even consulting the Signal permitted the luxury of completing their
Corps. Few of these men reached the Signal training and of acquiring experience before
75
they went into action. Unseasoned, half-
(1) Interv, Sig C Hist Sec with Col Herrelko,
Air Corps, Philadelphia, 11 Mar 47. (2) Hist cited trained or worse, they would have to learn
n. 74, Apps. I, II, III. (3) "Signal Corps Train- as they worked.
ing in the AAF," Signals 1:2 (November-Decem- The strain of life in advanced areas, with
ber, 1946), 26-30.
76
These courses were added to the curriculum on that of learning difficult communications
1 January 1942. Signal Corps Information Letter, skills while maintaining full schedules of the
No. 3 (Feb 4 2 ) , p. 25.
77 79
Totals were obtained from tables contained in Memos, O/C Mil Pers Div OCSigO for Dir
Item 167, Signal Corps School Headquarters File of Pers Hq AAF and for Dir of Pers SOS, 30 Mar
352, Aircraft Warning Department 1942. 42. SigC 322 Sig AW Cos, 1940-43.
78 80
(1) Comment by Dir of AW Dept, SigC School, Memo, O/C Air Com Div for Chief of Opns
n. d., attached to Ltr, CG CAC to CG AGF, 7 Br OCSigO, 19 Jan 42, sub: Plan evolved to meet
Apr 42, sub: Maint course SCR-268, SigC School; anticipated immediate demands for task forces in-
(2) Tables of AW Dept Students. Items 167 and volving AW units. SigC 320.2 Task Forces, SPSTP
199 in file cited n. 77. 5.
56 THE SIGNAL CORPS
usual military duties, was hard on the men. nearly every officer be put in a job, not in
But the situation was even more cruelly dis- a school. Few could be spared from troop
heartening to their officers. To wait anx- or administrative duties, and many who had
iously for desperately needed technicians been in the schools at the outbreak of war
only to learn upon their arrival that they were now being withdrawn for urgent as-
were not really trained at all was bitterly signments before they had completed their
frustrating. Signal officers such as Maj. courses. This situation was general; it had
Gen. Spencer B. Akin of General MacAr- existed for months. For example, the Air
thur's staff in Australia were providing Force Combat Command, although want-
communications with almost no equipment ing Signal Corps-trained officers, had never-
and practically no seasoned men. They theless warned, even before Pearl Harbor,
needed every pair of skilled hands. To Akin, that it could send no more officers to
the arrival of untrained signal troops was an fill its quotas in the Signal Corps School.
actual handicap because it meant that he Once its officers had been assigned to units,
would have to divert men from his inade- they could not be removed for schooling
quate supply of skilled specialists to train because this would hold up the field train-
the newcomers.81 ing of their units. It was hard to get officer
If the Army could not afford the luxury students; still harder to keep them in
of fully training its enlisted communications school.83
specialists, obviously it could not afford to The Electronics Training Group pro-
send its officers to school for full terms, vided an example of very sharply abbrevi-
either. The Secretary of War announced ated training. By the beginning of 1942,
late in January 1942 a policy of sending
none of the officers had completed the
younger officers to service schools before
courses in the British Isles. Yet they were al-
their assignment to field force units. He had
previously, late in December, authorized ready in demand within the first month of
the Chief Signal Officer to retain any grad- the war. They were needed as radar instruc-
uates of the officer candidate school who tors for the Aircraft Warning Sendee, for
lacked technical ability in order to give duty in the continental United States and in
them eight weeks of specialty instruction in the vicinity of the Panama Canal, and for
the Signal Corps School.82 But such school- overseas requirements as yet indistinct.
ing pronouncements were a bit unrealistic. Training in ground control of interception
The rapid activation of new units, the bal- (GCI), at Army Air Forces project TRIGGER
looning activity in every area of Signal in Florida, awaited the arrival of a handful
Corps administration, the scarcity of of- who were receiving special instruction in
ficers everywhere—all these required that Britain to fit them to teach the subject.
81
Interv, SigC Hist Sec with Gen Akin, CSigO,
These were withdrawn from the Royal Air
18 Oct 49.
82 83
(1) Ltr, TAG to CG's All Corps Areas, 30 Early in January, the War Department ordered
Jan 42, sub: Troop-age officers with overhead blanket withdrawal from schools of all 34th Di-
instls. AG 210.31 (1-23-42) OE-A-M. (2) Capt vision officers. (1) Ltr, CG AFCC to TAG, 4 Nov
Frederick Reinstein, Training Study of the Signal 41, sub: Res Officers to SigC School, Ft. Mon-
Corps Officer Candidate School, 1939-1944 mouth; (2) AG Ltr to CSigO, 2 Jan 42, sub:
(1944), SigC historical monograph C-6, pp. 12-13. Release of 34th Div Pers now at sv schools. AG
SigC Hist Sec File. 320.2 (1-1-42) (MT-A).
THE CALL FOR TROOPS 57
Force schools on 5 January and left Eng- assignment to the laboratories at Wright
85
land with only a small part of their course Field and at Fort Monmouth.
84
completed. Meanwhile, training which approxi-
Curtailed as their training had been, there mated that given the Electronics Training
was no substitute for the knowledge which Group officers in British military schools
these young officers possessed. In all the was going forward at the Massachusetts In-
United States there was no other reservoir stitute of Technology, and at a less advanced
of men trained in the new techniques of level at the Cruft Laboratory of Harvard
radar, because up to this time the knowledge University. Courses quickly undertaken in
had been confined to a few men in Army other civilian educational institutions of the
and Navy laboratories, in the Radiation country, under the U. S. Office of Educa-
Laboratory of the Office of Scientific Re- tion's war training program, were fitting
search and Development, and in the firms many other men for duty with the Aircraft
which manufactured the equipment. The Warning Service in one capacity or another.
British co-operated by accelerating and ab- By the end of February, the scope of all
breviating the training in order to speed training had broadened encouragingly. But
the return of their American students to the it would be months before the products of
United States. Eight, hastily trained in the the schools could assume the duties for
very high frequency techniques of Chain which they were being trained, and no one
Home Low (CHL) and Plan Position Indi- could tell what demands for signal special-
cator (PPI) radar equipment, returned in ists the next few months would bring.
February. A larger group, who were re- Could unskilled men in the numbers au-
thorized and of the caliber received be con-
ceiving special instruction in siting, installa-
verted into specialists in time? 86
tion, and maintenance, followed early in
85
March. Twenty-five officers who had begun (1) Ibid., .pp. 20-21. (2) OCSigO R&W
Action 1, R&D Div (M-7-D GH) to O/C R&D
training in the October class came back for Div, 3 Jan 42, sub: ETG; (3) Msg, Chaney, Lon-
don, to AGO, 31 Dec 41, No. 330. SigC 352.11
84
Ruth F. Sadler, Mil Pers Br OCSigO, History ETG.
86
of the Electronics Training Group in the United For a detailed account of signal schooling
Kingdom (March, 1944), SigC historical mono- during the period January—July 1942, see Chapter
graph G-5, pp. 21, 28. SigC Hist Sec File. VII, below.
CHAPTER III
enjoyed, had done the same for all the were designated respectively Deputy Chief
technical services. It had also stepped down Signal Officer, chief of the Supply Service,
the Infantry, the Armored Force, and other and chief of the Field Service. These two
Army components which the Corps was ac- services, Supply and Field, were the new
customed to serve. It left the Signal Corps' supervisory echelons. Under Milliken fell
largest single customer, the Army Air the co-ordination of communications and
Forces, one level higher. Figuratively speak- air communications as well as personnel and
ing, when Olmstead talked to Arnold, the training, together with signal plans and
line would have to carry the voice of Som- operations. Code remained the principal
ervell as well as his own. Moreover, the administrative officer. For a time photog-
circuit to most signal officers in the field raphy was removed from Army communi-
was broken; that to the Chief of Staff was cations, where it had not fitted at all, and
blocked. Without a direct line to the Air or was attached to the Administrative Branch,
Ground Forces, or to the Staff, or to the where it fitted no better. Its divergence was
corps areas, the Signal Corps was obliged immediately apparent, and so was that
to ask the Services of Supply to do its talk- of the administrative communications com-
ing, expressing even the most technical sen- plex; so that there was nothing to do but
timents to them.4 to raise each of them to the level of serv-
Yet if the organization of the Services of ices also.6 Simplicity of organization seemed
Supply seemed to pull together dissimilar unobtainable. Unrelated functions, boxed
functions, not all of which involved supply, together in an organization chart, were not
it only repeated on a large scale what Sig- any more securely packaged in one than in
nal Corps administrative changes had al- another, whether in the Office of the Chief
ready been doing, and were continuing to Signal Officer's box or in the Services of
do. For the Signal Corps, like Somervell's Supply's. They kept bursting the lid.
larger aggregation of services, was some- Meanwhile, a lesser move organized Gen-
thing of a hasty pudding whose ingredients eral Olmstead's executive staff into two di-
tended to separate. General Olmstead was rectorates, Col. Frank C. Meade heading
touring the west when the 9 March reor- one for planning, Maj. William D. Hamlin
ganization took place.5 But he immediately continuing the executive function under a
had his office reflect the change by creating new title. The fact that Lt. Cols. Francis
new supervisory levels and inserting them H. Lanahan, Jr., Victor A. Conrad, and
between the chief and the divisions just Wesley T. Guest were all assigned to Meade
as the Services of Supply and the Army suggested that the Directorate of Planning
Ground Forces now stood between the was to have considerable importance. All
Chief of Staff and the arms and services. the while, after 9 March, the presence of
Brig. Gens. James A. Code, Jr., Roger the Services of Supply was making itself
B. Colton, and Charles M. Milliken now felt, so that planning in any echelon below
4
(1) Memo, Col David McL. Crawford for Brig
it was likely to be reduced to either follow-
Gen Charles M. Milliken, 3 Jul 42, sub: Sig offi-
6
cers for AGF, AAF, SOS, WDGS; (2) Rpt of As the Army Pictorial Service and the Army
Bd of Officers, OCSigO, 10 Jul 42. SigC SPSTP-6. Communications Service, respectively. See Signal
5
Telecommunications Reports, VIII, No. 28 (5 Corps Administrative Log, 1939-1945, OCSigO
Mar 4 2 ) , 13. Orgn Charts through Jun 42. SigC Hist Sec File.
THE CALL FOR EQUIPMENT 61
ing prescriptions from above or unobtru- Colonel Colton had come to Washington
sively seeking to write the prescription. from the Signal Corps Laboratories to be-
These many changes in organization come chief of the Materiel Branch, now the
were made in an effort to keep up with an Supply Service. Colton was in many re-
expansion so swift that even under a system spects the number two man in the Signal
with which they were familiar, admin- Corps, and as director of the Fort Mon-
istrators would have been strained to co- mouth laboratories had been at the fore-
ordinate and supervise so many new units. front in the research and development or-
The over-all Services of Supply was not ganization. He was a man whose back-
familiar, but new, disparate, and untried. ground included degrees in electrical en-
It added to paper work. Some of its di- gineering from Yale and the Massachusetts
rectives were wholly extraneous. Some fol- Institute of Technology. In its eighty years
lowed procedures already in effect but with the Signal Corps had built up a tradition
just enough deviation to make reissues of of technical men who were well able to deal
Signal Corps directives necessary in order with scientists on scientists' terms. Col.
to conform.7 Regulations became increas- Hugh Mitchell, Colton's chief subordinate
ingly verbose. How properly to prepare let- as head of the Research and Development
ters, memoranda, and routing slips plagued Division, had long been associated with Sig-
the thousands who either dictated or typed nal Corps research, as had Lt. Col. Tom C.
them. Confusion of this sort penetrated to Rives, Mitchell's deputy. Both had M. S.
all levels of command. The Chief Signal degrees in electrical engineering from Yale,
Officer encountered it in dealing with his and Rives had been so long and so closely
superiors in the Services of Supply and with a part of the Signal Corps development
his subordinates in the Signal Corps.8 Yet work for the Air Corps at Wright Field that
somehow, in spite of annoyances, obstacles, he knew the subject well. These were ex-
devious channels, regulations, and direc- perienced research and development of-
tives, in spite of organizations which fell ficers, as was also Colton's successor over the
out and re-formed almost daily, the hetero- Signal Corps Laboratories, Maj. Rex Van
geneous and hastily assembled office staffs Den Corput, Jr., not to mention Col. John
and all the phases of Signal Corps activity H. Gardner, director of the Aircraft Radio
in the critical early months of 1942 gathered Laboratory serving the Air Forces at Wright
momentum. Even Research and Develop- Field, Ohio.
ment, however roughly shouldered by its At the Washington headquarters, Colton
running mate, Supply, continued to cover was demonstrating a feat of Roman riding.
ground fast. Of his two steeds, the one, Research and
Development, which had been galloping
7
For example, Signal Corps organization charts hard upon Pearl Harbor, was being pulled
carried designations of branch for first level, di-
vision for second. Services of Supply decided upon short by the other, which was Supply. For
a nomenclature of division for first level, and the Supply mission, so much more the com-
branch for second, necessitating reissue of all Sig-
nal Corps charts and memoranda. Memo, CofS munications industry's creature than the
SOS to TAG, 23 Jul 42. AG 020 (3-2-42) (1) Signal Corps', had scarcely begun to
Sec. 3.
8
Office Regulations, OCSigO, Changes 217 to
lengthen its pace. From now on, Supply
443 inclusive, 9 Mar 42 to 3 Oct 42, inclusive. demanded and got most of Colton's atten-
62 THE SIGNAL CORPS
tion because shortages of almost all cate- Radar was the electronics prodigy, and in
gories of equipment were critical through- considerable part a creation which the Sig-
out the Army.9 The dual organization under nal Corps had attended from the beginning.
Colton was based upon the "premise that It had grown so rapidly (however secretly)
Signal Corps supply begins with Research that it had ceased to be merely a specialized
and Development." 10 On this premise a field of radio.13 Formally, the Signal Corps
Radar Division made its appearance in radars were still SCR's, but actually they
January, because radar supply was the ob- had moved into another area of electrical
ject of one of early 1942's most desperate communication altogether. It is worth quot-
calls. The demand for radar was universal; ing personnel figures to show the extraordi-
it came even from Secretary Stimson, who nary advance of the new equipment in the
was highly alert to radar's capacities.11 In a total range of the Signal Corps' research
move which reached through the Office of and development interests. At the end of
the Chief Signal Officer to the Laboratories the fiscal year in June 1942, 62 percent of
themselves, radar work was set apart from the officers assigned to research and devel-
general development. opment and 55 percent of the civilians were
In the Fort Monmouth area what be- concerned wholly with radar or with the
came known as radar was called Radio related work on aircraft communication
Position Finding. The RPF Section of the and navigation equipment. The growth of
Signal Corps Laboratories became Field the research and development function as
Laboratory No. 3, isolated for secret work, a whole appears in the fact that 358 officers
apart from the eyes of the curious, in the and 14,337 civilians were at work in the
scrub barrens of Sandy Hook, New Jersey. Laboratories and in Washington six months
Work on ground radar had already ex-
panded into areas in Rumson, New Jersey, Monmouth research mission overflowed were No.
2, which became the Eatontown Signal Laboratory
near the Hook; at Twin Lights, Highlands, and which worked on wire, direction-finding,
New Jersey, at the very base of the Hook; sound-and-light, and meteorological projects; and
and on Sandy Hook itself, site of Fort Han- No. 1, later known as the Coles Signal Laboratory,
which developed radio equipment.
cock, then a Coast Artillery installation Historical Report of the Signal Corps Engineer-
guarding the approaches to New York ing Laboratories (Ft. Monmouth, 1944), pp. 5ff
and 26f. Hereafter referred to as Hist Rpt SCEL.
Harbor.12 SigC Hist Sec File.
13
By a series of flounderings and false steps in
9
The several divisions of the supply function in the top intelligence services, the word radar was
the Materiel Branch were: Scheduling, under Lt. first sanctioned, then forbidden. In deference to
Col. Eugene V. Elder; Procurement, under Col. the confusion, both the Radar Division and the
Clifford D. Cuny; Storage and Issue, under Lt. Col. Signal Corps Radar Laboratory had to be renamed
R. C. Hildreth; and Maintenance, under Lt. Col. after they had been in existence for some time.
John M. Heath. The last of the seven divisions of They became the Electronics Branch and the Camp
the Materiel Branch was the Legal Division, under Evans Signal Laboratory, respectively. The ground
Lt. Col. Conrad E. Snow. Signal Corps Information radar laboratories moved early in 1942 some miles
Letter, No. 3 (February, 1942), pp. 15ff, including down the Jersey coast to Camp Evans, at Belmar.
orgn chart, 21 Jan 42. Camp Evans, so designated by War Department
10
Ibid., p. 6. General Order, 17 February 1942, in memory of
11
Henry L. Stimson and McGeorge Bundy, On Lt. Col. Paul W. Evans, Signal Corps, who had died
Active Service in Peace and War (New York: in the Panama Canal Zone on 10 April 1936, was
Harper & Brothers, 1948), pp. 508ff. dedicated on 31 March 1942. Lab Monthly Prog
12
Two other Field Laboratories into which the Rpt, Mar 42. Evans Sig Lab File, Belmar, N. J.
THE GALL FOR EQUIPMENT 63
after Pearl Harbor, where six months before men who had known it longest and most
that event there had been respectively 63 searchingly. The pattern which began to
and 1,619.14 appear with emphasis upon radar, dividing
Recognition of the fact that the empha- research and development equally between
sis was thus being redistributed brought radar and other kinds of equipment, was
about the January change in the Materiel thus completed at Monmouth as at Dayton.
Branch which made radar, with Colonel Lt. Col. Oscar C. Maier was appointed
Rives at its head, a separate division. The chief both of Squier, at Monmouth, and of
assignment given the Radar Division was the two Field Laboratories, at Eatontown
as explicit as it was total. It was to be "re- and Camp Coles for wire and radio respec-
sponsible for the supervision of all Radar tively, and together given the name General
and Aircraft Radio . . . from the incep- Development Laboratories. Correspond-
tion of the project until the equipment is ingly, Lt. Col. James D. O'Connell, an offi-
developed, procured, installed, and [pro- cer who had an amount of experience at
vided with] the proper spare parts and the Fort Monmouth laboratories compara-
maintenance personnel . . . ." 15 ble to Rives' at Wright Field, became direc-
At Wright Field a parallel change oc- tor of the parallel General Development
curred, which brought radar into a separate Division in the Office of the Chief Signal
unit supervised by Maj. William L. Bayer Officer.17 Thus all of the fundamental and
and merged the communications and navi- vital Signal Corps research in the long-
gation units into the single responsibility of established fields like wire, radio, and
Lt. Col. Hobart R. Yeager.16 In the fact meteorology came under O'Connell's
that Yeager was an Air Forces officer was supervision.
proof that the Air Corps and the Signal
Corps could co-operate. Further proof lay Wire, the Basic Equipment
in the careers of Bayer, enthusiastic for air-
borne radar, and of the director of the en- Wire and wire signaling devices had long
tire laboratory, Col. John H. Gardner, who been the core of signal operational equip-
had been at Aircraft Radio Laboratory long ment and, in providing the bulk of com-
enough to feel the pride of possession about munications for large Army installations in
it. World War II, would remain so. A core of
At Fort Monmouth, meanwhile, as Field huge dimensions it would become, in di-
Laboratory No. 3 became the Signal Corps rect proportion to the scale of vast, indeed
Radar Laboratory in January (soon trans- world-wide, theater operations. Thanks to
ferring to Camp Evans, Belmar, New Jer- the application of the commercial carrier
sey), ground radar became the entire con- system to the military, a single wire circuit
cern of Lt. Col. Rex Corput, Jr., one of the could carry not one but several signals simul-
14
CSigO, Annual Report, 1942, p. 254. taneously. Telegraph in particular would be
15
Signal Corps Information Letter, No. 3 (Feb entirely revolutionized, both in established
42), p. 14.
16
Ltr, Col John H. Gardner, Dir of ARL, to
administrative circuits and in temporary
Chief of Experimental Engr Sec, Wright Fld, 20
17
Jan 42, sub: Reorgn of ARL, in History of Air- (1) CSigO, Annual Report, 1942, pp. 3Iff, in-
craft Radio Laboratory, 1 Oct 43, doc supplement, cluding orgn chart, 23 Feb 42. (2) Hist Rpt SCEL,
p. iii. SigC Hist Sec File. p. 27.
64 THE SIGNAL CORPS
field installations, because of another recent preferred to the polarential. The BD-100
commercial development, the teletype- gave excellent service throughout the war
writer.18 as part of the TC-3, and constituted "one of
During 1942 teletypewriter equipment the major contributions in the field of tele-
20
went into the field in a big way for the first graph-and-teletype-switchboard design."
time, and not a moment too soon to meet In the spring of 1941 the Signal Corps
the needs of the many huge installations Board had given test models a thorough
springing up throughout the zone of the in- going over and then its blessing. By Sep-
terior. In March 1942 production of tele- tember the Signal Corps had completed
graph printer sets EE-97 and EE-98, for procurement arrangements, and now in
mobile and fixed operation respectively, be- 1942 the Army began getting the new tele-
gan with the delivery of 150 sets in the first typewriter switchboards, while the Signal
batch, somewhat ahead of schedule.19 Corps General Development Laboratories
The introduction of the teletypewriter at Eatontown completed the development
into the Army required a new switchboard of the TC—3. The complete set, including
and suitable accessories, in fact a whole tel- one TG-7, a rectifier, the heavy power unit
egraph or teletypewriter central office set, PE-75, the switchboard itself, together with
which became the mobile TC-3. Under tools and spare parts, weighed about a half-
21
project 4-17 set up in the summer of 1940 ton.
the Signal Corps Laboratories had begun to The immense traffic potential of teletype
develop the heart of the set, switchboard would mean little if the linking wire lines
BD-100, a 10-line board, weighing only were inefficient, limited in capacity, easily
200 pounds, which was phenomenally light injured or disrupted, slow to install on
for equipment of this kind. The BD-100 poles. This had been the situation in the
was but one quarter to one third the size 1941 maneuvers when Maj. Raymond C.
of the nearest comparable equipment which Maude had reported that the limited range
the Bell Telephone Laboratories had of- of field wire W-110-B restricted it to use
fered to the Signal Corps. The reduction within a division. What was wanted, he had
largely resulted from the neutral system of said, was a field wire able to carry voice 35
teletype operation which the Signal Corps 20
Maj Gen Roger B. Colton, "Army Ground
Communication Equipment," Electrical Engineer-
18
For a list of the more important wire equipment ing, LXIV:5 (May, 1945), 175.
21
items, see Terrett, The Emergency, Appendix. (1).Hist Rpt SCEL, p. 167. (2) SigC Labs
19
The TG-7 which constituted the chief com- Annual Rpt, 1941, p. 38. (3) OCSigO Coord and
ponent of the sets was a modification of commer- Equip Div Case 5, Telephone Switchboard, 24 Jan
cial model 15 manufactured by the Teletype Cor- 42, and Case 16, Telegraph Central Office Set TC-
poration. (1) Ltr, Lt Col William S. Rumbough 3 (Printer) (BD-100) vs. Telegraph Central Office
to President SigC Bd, 8 Aug 41, sub: Use of tele- Set TC-7 (Printer) (69-C-1), 10 Feb 42. SigC
graph printers and associated equip. SigC 413.44 C&E Cases. C&E Cases originated in the Coordina-
(BD-100) Telegraph Printers Associated Equip. tion and Equipment Division, which in February
(2) Office of Stat Svs Hq SOS, Weekly Stat Rpt, 1942 became the Communications Coordination
Sec. II, Air and Sig, No. 40, 4 Apr 42, p. 4. Until 9 and Equipment Division, under the Operations
March 1942, these reports were issued by the Sta- Branch. In the March 1942 reorganization, the
tistical Branch, OUSW. From 9 March to 9 April activity became the Communication Coordination
1942 they were issued by the Office of Statistical Branch, having under it several divisions, of which
Services, Headquarters SOS. From 9 April 1942 one was the Equipment Coordination Division.
they were known as the Weekly Statistical Sum- Hereafter referred to as C&E Case. (4) SigC 3
mary rather than as the Weekly Statistical Report. (ASF Catalog) Sig Supply Catalog, Sep 45, p. 356.
NEW DEVELOPMENTS IN SIGNAL COMMUNICATIONS included spiral-
four cable (left and right above) and the BD-100 teletypewriter switchboard (below), with
three TG-7 teletypewriters.
264-211 O - 78 - 6
66 THE SIGNAL CORPS
to 40 miles and capable of being installed The Signal Corps did not have the honor
quickly. Open wire construction involving of devising spiral-four (WC-548). It had
pole lines was too slow, he added, to keep been adapted, through the British, from a
up with moving armies. The Eatontown German long-range field cable, some of
Laboratory now had spiral-four, the answer which British commandos had seized in
22
to Maude's wishes. It received its name early raids upon the Continent. From it, the
from the arrangement of its four wire con- British had developed what they called
ductors, which spiralled around a fiber core. quad cable. Signal Corps laboratory repre-
The whole, wrapped in wire shielding, then
sentatives had seen samples for the first time
encased in an insulating rubber jacket, was
in the Bell Laboratories during the summer
devised to provide long-range carrying
power with minimum electrical loss and before Pearl Harbor. Perfected for Ameri-
cross talk. Flexible, half an inch in diameter, can use by the Bell and Signal Corps Lab-
of a tensile strength over 600 pounds, yet not oratories working together, spiral-four
excessively heavy, it could be handled far helped make possible military use of com-
more expeditiously than other cables that mercial carrier circuits and the extension of
the Signal Corps had used before. The Sig- the heavy duty communications systems di-
nal Corps developed plastic snap connec- rectly to the theaters of war.
tors, so that crews unrolling the quarter-mile By 1942 Signal Corps wire engineers had
lengths (called cable assemblies, CC-358) this field cable so well in hand that they had
from standard Signal Corps reels DR-5 (or begun to develop carrier communication
adapted for spiral-four as DR-15) could equipment for it. A C-type spiral-four car-
quickly link one length onto another. More- rier permitted four conductors, whether on
over, into each connector was built a loading poles or in a cable, to carry many telephone,
coil and balancing condensers which ex- telegraph, and teletypewriter circuits simul-
tended the talking range to 40 miles, without taneously. A single spiral-four field cable
the use of repeater equipment. In January could do the work of multiple open wire
1942 the Signal Corps announced this new lines and obviate the slow tedious prelimi-
field cable, with high hopes for favorable re- naries of setting poles, fixing crossarms, and
ception. By the end of the month, on 26 stringing the individual wires. Spiral-four,
January, the Signal Corps Technical Com-
laid on the ground or buried, also avoided
mittee recommended its standardization
and the War Department made it official the exposure to enemy action which a pole
on 18 February. Western Electric, General line invites. Under laboratory projects 2-4,
Cable Corporation, and U.S. Rubber each entitled Field Cable Research, and 4-18,
contracted for small quantities for service Carrier Telephone Systems, this work was
testing.23 now progressing. Field wire systems which
22
in former days sufficed for distances of only
Memo, Maude for Actg CSigO, 7 Oct 41, sub: a few miles and for the transmission of only
Rpt of observation Second and Third Army maneu-
vers. SigC 354.2 Second Army Maneuvers 1942 occasional messages were going to be sup-
(Aug-Oct 41) (AR-110). plemented by systems which could relay
23
(1) Signal Corps Technical Information Let-
ter, No. 2 (January, 1942), p. 25. (2) Hist Rpt messages for hundreds of miles, and not just
SCEL, pp. 168ff. (3) SCL Monthly Prog Rpt, occasional signals, either, but unbroken tor-
Jan 42, p. 4. (4) Memo, O. B. Jacobs (Bell Tele-
phone Labs), 23 Feb 42, sub: SigC carrier cable
rents of voice and teletype flowing night
system. SigC 413.42 Carrier Sets 1, Jan-Jun 42. and day. This became communications in
THE CALL FOR EQUIPMENT 67
the fullest sense, and spiral-four cable orderly intelligible manner. This AAF re-
24
helped to make it possible even in the field. quirement reached the Signal Corps in the
As the laboratories developed spiral-four first week of 1942.25
and looked into the application of carrier These requirements for military com-
systems to the military, field arms fast came munications on a huge scale, backed up now
up with requests for the new development. by the realities of war, brought forth from
The Air Force Combat Command, for ex- the Signal Corps C-type carrier equipment.
ample, was beset with a need for multiple For some months under project 4—18, Car-
communication channels, both in order to rier Telephone Systems, the Laboratories
serve the far-flung multifarious business of had been considering military applications
air defense and in order to channel quickly of Western Electric's types H and G tele-
large numbers of aircraft sighting reports phone carrier systems. By mid-1941 the
into information centers and then to convey project got a shove from spiral-four devel-
instructions dispatched to intercept air- opments and the promise of huge communi-
fields. Thus swamped with communication cation capacity which the new field cable
needs which dwarfed any previous military held forth. At the end of October 1941, the
requirements for a field arm, the Combat Signal Corps Laboratories reported that
Command drew up the following request in spiral-four research had "brought forth pre-
the days immediately after Pearl Harbor. liminary plans for a comprehensive system
Learning from a Signal Corps laboratory of voice telephone, carrier telephone and
memorandum of 15 December that spiral- carrier telegraph systems to span distances
four field cable was practicable, the Air from 50 to 150 miles and up. The projected
Forces at once asked for 2,100 miles of system," the report continued, "will furnish
spiral-four; 36 sets of telephone and tele- four speech channels over a single cable, one
graph carrier terminal sets, each to handle of which may be utilized for the transmis-
3 voice channels and 4 teletype circuits; pO sion of 4 to 6 channels of voice-frequency
carrier repeaters; and 12 sets of telephone carrier telegraph." This would soon become
terminals, each to handle 4 voice channels. C-type carrier equipment, a modification
In short, the Signal Corps was going to by Bell Laboratories of existing commercial
have to provide carrier equipment at the equipment adapted for military use.26
telephone and telegraph terminals of the Thus, under pressure of Army needs, the
spiral-four cable, also repeater stations Signal Corps in collaboration with Bell
along the cable line to amplify the signals on Telephone during early 1942 worked up
their way. This equipment would be needed specifications both for carrier telephone
to feed the several simultaneous signals into terminal equipment, which became CF-1
the cable, to boost them any distance, and (part of TC-21), and for repeater sets,
then to filter them out at the other end in an which became CF-3 (part of TC-23). By
24 25
(1) SCL Monthly Prog Rpt, Aug 41, pp. 4, Ltr, CG AFCC to Chief of AAF, 23 Dec 41,
9f. (2) Memo for File, B. S. Anderson, Electrical sub: Urgent field com facilities and 1st Ind, Mar-
Engr SSL, 14 Aug 41, sub: Discussion of proposed riner to CSigO, 5 Jan 42. SigC 413.43 (WC-548)
new wire transmission medium and transmission sys- Cable 1, 1941-43.
26
tems. SigC 413.43 (WC-548) Cable 1, 1941-43. SCL Monthly Prog Rpt. Nov 40 and there-
For further discussion of spiral-four, see below, pp. after, under project 4-18. Quotation is from re-
225-29, 367-70. port for 4 October 1941, pages 10 f.
68 THE SIGNAL CORPS
March arrangements had been made also Although telegraph in the form of tele-
for telegraph carrier terminal sets CF-2 type (both wire and radio) would carry
(part of TC-22). The Signal Corps placed far and away the bulk of World War II
orders with Western Electric for two sets long distance communications, telephone
each of CF-1 and CF-2, and for six sets of would receive very heavy use, too, especially
the repeaters CF-3, all to work with spiral- in headquarter installations. By 1942 the
four field cable. This equipment would give Signal Corps had either in production or
the Army such long-range heavy duty com- under development big telephone switch-
munications as it had never before enjoyed boards and central office sets which would
in the field.27 quite repair the need Colton had claimed
But the Army would have to wait a while, two years earlier, after the 1940 maneuvers,
for Western Electric to build the sets, for to be most urgent—namely, new switch-
these to receive service tests, and for full boards for heavy duty headquarters use.29
production to follow, if all went well. Late in 1941 TC-1 for army headquarters,
Meanwhile, the Signal Corps prepared spe- a huge central office set built around the
cific figures on what would be required to 100-line switchboard BD-80, had gone into
meet the needs that the Air Force Combat production. So too had TC-2, designed for
Command had outlined in January 1942. use in corps headquarters, employing the
General Olmstead had asked the Mon- 60-line board BD-89. These sets were pon-
mouth laboratories to make the estimate. derous affairs weighing tons, and might in-
He got the answer late in March from clude not one but several switchboards in-
Colonel Maier, now the head of the Signal stalled side by side as traffic needs might
Corps General Development Laboratory. require. The Air Corps men, wanting a
Accomplishment of what the AAF wanted small set weighing less than the divisional
would call for some extras—ringing equip- TC-4 (BD-96), got it when the Signal
ment for telephone channels, gasoline en- Corps Laboratories' Wire Section (Eaton-
gine-driven generators, storage batteries, town Laboratory) developed the TC-12
and trucks with trailers to house and convey around the efficient 20-line BD-91 (even it
the equipment. The cost, Maier estimated, weighed a walloping 300 pounds). In Jan-
would run to two million dollars.28 uary 1942 an Air Corps unit at Selfridge
Field, Michigan, and another unit at
27
(1) Ibid., Jan 42, p. 11; Mar 42, p. 10. (2) Mitchel Field, New York, completed service
Colton, Electrical Engineering, LXIV: 5, p. 175. testing the set. In February both returned
a unanimous report—approved. On 9
March Lt. Col. Francis J. Magee, head of
the Equipment Coordination Division, rec-
ommended BD-91 for standardization.30
mouth, to Signals, Washington, 25 Mar 42. SigC
413.42 Carrier Sets 1, Jan-Jun 42.
29
Terrett, The Emergency, pp. 154, 233.
30
(1) Hist Rpt SCEL, pp. 156^ 158-60. (2)
SigC TM 11-487, Electrical Communication Sys-
(1) Ltr, CSigO to Dir of SCL, 24 Jan 42, sub: tem Equipment, Oct 44, pp. 62-64. (3) Ltr, Col
Cost data on com equip for AAF. SigC 413.43 Magee to Subcommittee SCTC, 9 Mar 42, sub:
(WC-548) Cable 1, 1941-43. (2) Msg, TWP-4 Standardization of Switchboard BD-91. SigC
Maier, SigC Gen Development Lab, Ft Mon- 413.42 Switchboards 1942.
THE CALL FOR EQUIPMENT 69
All of the Army headquarters telephone For fighting men on foot in the field, light
and teletypewriter equipment, spiral-four weight was a prime desideratum, along with
and carrier, was heavy, entirely unsuitable as great efficiency as might be compatible
for fighting men to carry forward with them. therewith. Though quantities of these items
For them, in order to keep sharp the fighting were already flowing to the field troops in
edge of wire communications, the Signal early 1942, the Eatontown Laboratory con-
Corps provided field telegraph set TG—5 (a tinued work altering and improving. This it
buzzer, battery, and key for sending dah- did with Signal Corps wires particularly,
dits), field telephone EE-8, battery-pow- ever trying to increase their talking range,
ered, and, later in 1942, sound-powered their strength, and the efficiency of their
field telephone TP-3 (TS-10), conven- insulation against moisture and against the
iently unencumbered by any battery at all. abrasion of rough use. Poor splices in the
The Signal Corps provided the portable manufactured product were giving trouble,
switchboards BD-71 and 72, lightweight and in January the laboratory reported that
field wire W-l 10, the still lighter weight as- it was pressing the factories to reduce the
sault wire W-130, wire-reeling devices such number of splices and to strengthen the un-
as the one-man chest reel CE-11, holding a avoidable ones. In February the laboratory
quarter of a mile of assault wire, or such as workers were trying out a knitted covering
the two-man cradle RL-31, or axle RL-27 for W-l 10 in place of the braid whose man-
employed to pay out W—110 from reels ufacture consumed too much time. They
DR-4 and DR-5. kept up a continual effort to find insula-
70 THE SIGNAL CORPS
tion substitutes, thiokol, vinylite, buna, and shortages until the first bonanza year, fis-
so on, to reduce the consumption of precious cal year 1941, had had to conserve.32
rubber.31 The Army was burdened throughout the
BD-89 was the new division headquar- war with improvised regimental switch-
ters board, replacing BD-14. In the regi- boards. The obvious need for better port-
ments, switchboards BD-9 and 11, of able boards led the Signal Corps, in April
World War I vintage, had been replaced 1942, to prepare new military characteris-
by BD-71 and 72, and not very happily tics. In June, however, the effort was
either. They were the portable boards, with quashed by the Services of Supply and Gen-
six or 12 plugs, which the forward fight- eral Somervell, who "directed that no de-
ing troops lugged to front positions and velopment of a switchboard to replace
which connected up the light assault wire, switchboards BD-71 and BD-72 be under-
W-130, or field wire W-110-B, as infan- taken since the man-hours and the mate-
trymen furtively laid it from chest reels rials required for subject development could
(CE-11) or from hand-carried cradle RL- be employed to greater advantage on more
31 or from the same cradle hauled in a essential projects for which no substitute
jeep. The chief trouble with the boards was
exists." 33 The unsatisfactorily heavy BD-
their unnecessary weight, about 50 pounds
71 and 72 had to serve, and even they were
for BD-71, over 70 pounds for BD-72. And
not at hand in sufficient quantity (nor tele-
though the most obvious fault, weight was
not their only defect. They were at first phone EE-8, either) when war came. The
built from salvaged parts. On 15 January Army had to use stocks of old BD-9 and
1942 Capt. R. Lutes of the 54th Coast Ar- 11, as well 34
as the World War I telephone
tillery, Camp Davis, North Carolina, turned set EE-5.
in an unsatisfactory report on the line sig-
nal coil: the lead-out wire broke from han- Radio for Mobile Armies and for
dling shocks and the coil itself shorted World Communication
because of poor insulation. When the com- In 1942 the illusion of pushbutton war-
plaint came to the Laboratories, Capt. fare appeared, in electronic communcation
Floyd A. Minks, charged with Field Lab-
oratory No. 2 (Eatontown), replied that the 32
Rpt, Lutes to Mat Br, Maint Div OCSigO, 15
failure surprised no one. The coils had been Jan 42, and 1st Ind, Minks to CSigO, 25 May
42. SigC 413.42 (BD-71 and 72) No. 3, 1942-
salvaged from old switchboard units EE— May 1943. For telephone equipment generally, see
2—B which had long languished in depot Colton's remarks in Electrical Engineering, LXIV:
stocks. BD-71 and 72 had been built as 5, pp.3d174-75. 33
Ind, CSigO to Dir of SCGDL, 27 Jun 42,
stopgap sets and money savers, from parts on Ltr, CO Wire Sec SCGDL to CSigO, 23 Apr
of old World War I switchboards BD-9 and 42, sub: Tentative mil characteristics for switch-
board to replace switchboards BD-71 and 72.
11. The Signal Corps, harassed by money SigC 413.42 Switchboards 1942.
34
Unsatisfactory Rpts 1 and 2, 2d Lt Frank
31
(1) Signal Corps Technical Information Let- Doehner, Com Officer 113th Inf, to CSigO through
ter, No. 2 (January, 1942), p. 25; No. 3 (February, Sig Officer II Army Corps, 29 Jan 42, and 3d
1942), p. 61. (2) SCL Monthly Prog Rpt. Jan 42, Wrapper Ind, CSigO to Sig Officer First Army,
proj. 2-4, pp. 3ff. (3) SigC Gen Development Lab Governors Island, N . Y . , 23 Feb 42. SigC 413.42
Monthly Prog Rpt, Mar 42, proj. 2-4, pp. 3f. Gen. 1, Jan-Jul 42.
THE CALL FOR EQUIPMENT 71
at least, with the arrival of the "500" and Armored Force to embark upon FM radio,
"600" series of radio sets (one might also based on police equipment built by Fred
include Air Corps' VHF command set, Link. Immediately, vehicular frequency
SCR-522, with its four pushbuttons). In modulation so pleased the tank men that
tactical combat among highly mobile fight- the Armored Force switched from ampli-
ing machines, these pushbuttons marked tude modulation to frequency modulation
the beginning of really facile communica- for its short-range tank sets. By early 1941,
tions, in the sense that Colonel O'Connell therefore, the Signal Corps had ordered
had long been insisting upon at the Signal hundreds of Link radios, short-range fre-
Corps Laboratories, as when he frequently quency-modulated transmitters and receiv-
declared, in effect, "We're all through with ers, as substitute and training sets, pending
radio; hereafter we want communica- the time when the Bell Laboratories and
tions." 35 Western Electric could perfect and produce
What O'Connell meant, of course, was standard AF-III's, converting them from
instantaneous radiotelephone or intelligible their amplitude-modulated prototypes into
voice exchange, not radio in the long-es- the frequency-modulated pushbutton crys-
tablished military sense of continuous wave tal-controlled sets to be known as the 500
telegraph—spelled out laboriously in Morse series.36
code, if not further bedeviled by conversion The Signal Corps had begun getting the
into a secret code or cipher, into which the frequency-modulated Link sets for the
sender must first convert the plain text, and Armored Force before the end of 1941, not
out of which the receiver must recover in- so soon as the frantic tank men wanted them
telligible phrases. but somewhat sooner than radios of the 500
During the two years before 1942, most series could be had. The Link stopgaps were
vociferous of the ground troops demanding the SCR-293 (transmitter and receiver)
better radio equipment had been the Ar- and the SCR—294 (receiver only), of which
mored Force, seeking desperately to ready 1,200 of the former and 400 of the latter had
for combat its two original divisions, the been put on order early in 1941. With un-
First and the Second. Before the end of warranted optimism the contractors had ex-
1940 the Armored Force Board and the pected to complete delivery by September.
Signal Corps had decided upon a series of But production tarried as one difficulty arose
radio types that would completely meet all after another respecting the frequency chan-
Armored Force needs. The types were AF- nels of the sets, the power sources, and so on.
I, II, III, and IV, of which the III and IV Despite pressure from the Deputy Chief of
would be multichannel sets with crystal Staff and Signal Corps appeals for a high
control, allowing instant tuning or selection priority, no sets were delivered until Oc-
of frequency channels. By the turn of 1940 tober 1941. Thereafter production grad-
Capt. Grant A. Williams had induced the
36
For a discussion of FM types of radios, see
35
Interv, SigC Hist Sec with Gen Colton, Exec Terrett, The Emergency, pp. 141ff., 178.
vice-president Federal Telecom Labs, N.Y., 14 Feb Of the Armored Force 500 series, AF-III com-
50, p. 4. SigC Hist Sec File. Other forward-looking prised SCR-508, 528, and 538; AF-IV comprised
officers, such as Capt. Grant A. Williams, Signal SCR-509 and 510. SCR-509 and 510 were de-
officer serving with the Armored Force, insisted veloped by the Signal Corps Laboratories and were
likewise. See Terrett, The Emergency, p. 139. built by the Galvin Manufacturing Co. (Motorola).
72 THE SIGNAL CORPS
ually increased to reach a total of nearly Thus, in consequence of Armored Force
700 sets, 554 SCR-294's and 138 SCR- demands for the latest and best in radio, the
37
293's, by the week ending 3 January 1942. Fort Monmouth Laboratories were report-
Now, in January 1942, with the war on ing by January 1942 that the design of ve-
in earnest, the production of the 500 series hicular radio sets "has undergone a marked
by Western Electric had just barely begun change"—rather an understatement. It had
and the deliveries of the Link stopgap sets been revolutionized from amplitude modu-
were behind schedule. Desperately the Ar- lation to frequency modulation, going over
mored Force increased requirements for to a totally new type of smaller short-range
short-range FM's, even including the sub- set affording better communication, radio-
stitute training Link sets, which were never telephone exclusively of course, with less
intended for battle use. They would see interference, operating in the very high fre-
combat just the same, since they were the quencies. The use of numerous crystals, each
first produced and since every last FM of a size greatly reduced from prewar types,
vehicular radio was needed on fields of permitted instant selection of any ten chan-
battle. nels from an available total of 80 in the case
By mid-January the Signal Corps had not of the 500 series. By the end of March, Ar-
yet completely equipped even the 1st and mored Force units were receiving these sets
2d Armored Divisions with modern radio. from Western Electric in the hundreds each
Armored Force's latest radio requirements, week.40
just drawn up by Lt. Col. William P. With- The first of Field Artillery's 600 series sets
ers, demanded over 2,500 sets for the 1st and came out in 1942 after the artillerymen,
2d Divisions—a mighty increase over 500 having seen the 500's, had asked for simi-
sets, the request for which had seemed so lar radios modified to operate in Field
huge only a year and a half earlier.38 More- Artillery's frequency band having 120
over these 2,500 sets were all (except for 169
channels. The SCR-608 got its tests at Fort
SCR-193's and 6 SGR-299's) the star-
Monmouth during 25-28 February 1942
tlingly new and superior type of radio which
and proved rather better even than its pro-
employed frequency modulation. Withers
wanted the FM types by 1 March and 15 totype, SCR-508. Meanwhile, Field Artil-
March deadlines.39 lery rushed plans to issue the new 600 sets
37
to all its units by the end of the year, to
(1) Ltr, CSigO to Dir of SCL, 30 Jan 41, sub:
Radio equip for Armored Force; (2) Ltr, CSigO replace in particular the SCR-245, inci-
to Priorities Committee, ANMB, 24 Mar 41, sub:
40
Preference rating. SigC 413.44 (SCR-293) No. 1, (1) Signal Corps Information Letter, No. 2
1941-Apr 1942. (3) Weekly Stat Rpt No. 18 (1 (January, 1942), p. 29. (2) Weekly Stat Rpt 39,
Nov 4 1 ) , p. 3; No. 19 (8 Nov 41), p. 3; No. 28 28 Mar 42, p. 2. (3) See Terrett, The Emergency,
(10 Jan 42), p. 15. pp. 180-82.
38
OCSigO R&W Action 1, Col Mitchell, Dir of The Weekly Statistical Report lists the deliveries
R&D Div, to CSigO, 26 Jun 40, sub: Estimate of for the first three weeks of March as 175 SCR-
rqmts of Sig equip for one armored div, and at- 508's, 339 SCR-528's, 312 SCR-538's. By July
tached Memo, Brig Gen A. R. Chaffee for CSigO, 1942 deliveries of BC-603 and 604, receiver and
25 Jun 40, same sub. SigC 320.3 Armored Force transmitter components of the SCR-508, would be
and Armored Div, 1940-43. scheduled at 11,600 a month. Ltr, OCSigO to O/C
39
Memo, Rives for Mat Div OCSigO, 12 Jan Philadelphia SigC Proc Dist, 20 Jul 42, sub: De-
42, sub: Immediate radio set rqmts for 1st and 2d livery schedule radio transmitter BC-604, radio
Armored Divs. SigC 413.43 Gen. (Sets) 1, Jan- receiver BC-603. SigC 413.44 (BC-603) Radio
Apr 42. Receiver.
THE CALL FOR EQUIPMENT 73
dentally at a cost of about $1,450 more per Use. But efforts to develop, at that time
set. The new-fangled frequency-modulated on AM circuits, a nettable set which would
608 cost at first about $2,400, quite a sum work up to a seven-mile range and which
at that date for a maze of wire and parts would weigh not more than twenty-five
comprising one transmitter and two re- pounds proved unsuccessful. The Infantry
ceivers, the whole occupying but some three thereupon was induced to moderate its
cubic feet of .41 SCR-300 characteristics. In December
While the 608's largely relegated the 1941 the Infantry scaled down the required
SCR-245 to the background in the Field range to only two miles while increasing
Artillery, the somewhat smaller frequency- the weight limitation to thirty-five pounds.
modulated SCR-609 similarly replaced the Four manufacturers were willing to attempt
SCR-194, which had served for some years a very high frequency radio to meet these
as the artilleryman's walkie-talkie. Early characteristics, two of them (Hazeltine and
in January 1942 artillerymen at Fort Sill, Wilcox-Gay) making the attempt with
Oklahoma, ran comparative tests on the standard AM circuits, two (Galvin and
two radios, especially as used by a gun spot- Philco) taking a fresh departure with the
ter flying in a reconnaissance plane and re- new revolutionary FM circuits. It would
porting to ground. The 609 proved to be be Galvin's FM service test offering which
much the better set.42 would win out in the SCR-300 competition.
The story of Infantry's famous walkie- Galvin held already a head start in FM
talkie, the SCR-300, an FM set and succes- development since the company had ac-
sor to the foot soldier's first walkie-talkie, the quired much experience in the new type of
SCR-195, lies principally in 1942, though circuits as it built AF-IV, SCR-509 and
production sets would not reach the field 510, which the Signal Corps Laboratories
till 1943. On the other hand, the first be- had designed and developed. Moreover,
ginnings of the set go back to 1940 when Galvin now enjoyed the skill of a foremost
the Signal Corps Laboratories undertook FM designer, Daniel Noble, the one who
project 10-3, radio set SCR-300, entitled had suggested that the Connecticut State
Ultra High Frequency Sets for Front Line Police try FM and who had thus helped
to launch FM vehicular radio upon its
41
(1) Ltr, Lt Col B. Evans, FA, to president spectacular career.43
FA Bd, Ft. Bragg, N. C., 16 Mar 42, sub: Test
43
of Engineering model of SCR-608 at Ft. Mon- (1) SCL, Annual Report, 1941, p. 66. (2)
mouth; (2) Ltr, Brig Gen G. R. Allin, Comdt OCSigO Engr and Tech Div, History of Signal
FA School, Ft. Sill, Okla., to CG Replacement and Corps Research and Development in World War
School Comd, Washington, 18 Mar 42, sub: New II (hereafter referred to as SigC R&D Hist), VIII,
radio equip; (3) Memo, Capt D. A. Newlin for Pt. 2, proj. 814, 10-3. (See Bibliographical Note.)
R&D and Supply Divs, 26 Aug 41. SigC 413.44 (3) Memo, Maj Hessel for Col Elder, 1 Nov 42,
(SCR-608) 1, 1941-Mar 1942. sub: Pertinent info concerning dev of radio set
42
Memo, J. V. Fill, Asst Radio Engr, and George SCR-300. SigC 413.44 (SCR-300) 1, 1942. (4)
F. Wright, Senior Engr Aide SCL, for John Hes- See Terrett, The Emergency, pp. 158, 183-84.
sel, Chief of Fld Radio Sec, 19 Jan 42, sub: Test Capt. F. F. Urhane, Assistant Officer in Charge
of radio sets SCR-609 and SCR-194 at Ft. Sill, of Field Laboratory No. 1, had even mentioned
Okla., beginning 5 Jan 42. SigC 413.44 (SCR- the British wireless set 48 as a possible answer to
609) 1, 1941-March 1942. On the 500's and 600's Infantry's need for a front-line radio. OCSigO
generally, see John J. Kelleher, "VHF and Micro- R&W Action 1, M-7-C-1 R&D to C&E, 23 Dec
wave Communication Systems," Signals 1:4 41, sub: Portable radio set, front-line use and incls.
(March-April 1947), 44-48. SigC 413.44 Inf Sets 2, 1940-41.
THE SCR-300 (ABOVE) AND THE SCR-536 (BELOW)
THE CALL FOR EQUIPMENT 75
While infantrymen had to wait until 1943 recommended that the Chief Signal Officer
before they got their first FM portables allow the diversion of the 300 sets since
(hand-tuned VHF, on 40-48 megacycles— Galvin was by this time producing 50 sets
the SCR-300's), they received several AM a day.46
field sets: the SCR-284 and its temporary The handie-talkie was destined to serve
substitute SCR-288, the SCR-511, and the as an Infantry front-line set, although it had
SCR-536. The 511, designed originally for been launched as Signal Corps' first tenta-
Cavalry, and the 536 for parachute troops, tive answer to Army's request for a very
44
both became standard Infantry sets. small radiotelephone which parachute
The SCR-284 was not, of course, port- troops might use. In fact, some at first re-
able in the sense that the 511 and the 536 garded it with no great enthusiasm since
were; several men had to back-pack the 284 Col. Rumbough had described it, in Octo-
and then set it up as a stationary field sta- ber 1941, as a "stop-gap" radio, which In-
tion. But either the 511 or the still smaller fantry would tolerate only until it got a more
536 a single soldier could carry and operate satisfactory, specifically a more powerful,
as he walked. In fact, the five-pound 536 set. At the same time Air Corps men looked
had been designed for one hand and the sourly upon any such paratroopers' set since
men dubbed it the handie-talkie by analogy they "very strongly objected to receiving
with the older SCR-195, the original tactical orders from every 'lance-corporal'
walkie-talkie.45 of the parachute troops" who might, for
Three hundred of the very first handie- example, have the audacity to ask for
talkies built by Galvin apparently went to bomber support.47
the Dutch in the East Indies early in 1942. Galvin, manufacturer of Motorola radios
A few days after Pearl Harbor Lt. Col. N. and specialist in automobile receivers, built
J. C. Tierie of the Netherlands Purchasing both the 536 and the 511, which were alike
Commission in Washington asked that the in that each was a single-frequency set,
United States Army permit Galvin to divert crystal controlled, operating in high fre-
200 sets for the parachute troops of the quencies 3-6 megacycles. The SCR-511
Netherlands Indies army in Java and 100 was an odd little radio, not to say a bit
sets for the Marine Scouting Patrol at the anachronistic, built around a guidon staff
Soerabaya Naval Base. Tierie first met with which a cavalryman, it was intended, would
refusal (the Signal Corps itself had not re- carry mounted, resting one end of the staff
ceived a set as of 23 December 1941). He in a stirrup. Yet it was not used on horse-
persisted and in January Colonel Colton back but in the hands of infantrymen either
afoot or in jeeps. Beach parties and boat-
44
In August 1941 the Acting Chief Signal Officer
46
had informed the Assistant Chief of Staff G-4 that (1) Ltr, Tierie to Col H. S. Aurand, GSC, 11
the Infantry would have to wait till perhaps Febru- Dec 41, sub: Petition to obtain diversion for de-
ary 1942 for its first SCR-284's, accepting mean- livery of 300 portable radio transceivers type BC-
while the substitute SCR-288. Actually the 284 611-A to be used for parachute troops; (2) 1st
did not appear till the week ending 8 June 1942, Ind, Colton for CSigO, 16 Jan 42, on Ltr, Col R. C.
when 31 sets were delivered, out of 17,681 on con- Benner, GSC Supply Div G-4, to CSigO, 7 Dec 41.
tract. (1) Memo, Col C. L. Eastman for ACofS SigC 413.44 Inf Sets 2, 1940-41.
47
G-4, 29 Aug 41. SigC 413.44 Inf Sets 2, 1940-41. OCSigO R&W Action 1, W. R. [Rumbough]
(2) Weekly Stat Rpt 51, 18 Jun 42, p. 23. WP&T to O/C Opns, 8 Oct 41, sub: Dev of radio
45
Terrett, The Emergency, pp. 139-40. sets for Inf. SigC 413.44 Inf Sets 2, 1940-41.
76 THE SIGNAL CORPS
men participating in amphibious opera- the first model in March and more than
50
tions also used it. The Signal Corps pre- a hundred in April.
pared the procurement specifications and The SCR-299 could travel anywhere its
standardized SCR-511 in January, issued truck transport and trailer, carrying its ex-
a letter of award to Galvin in February, and cellent power plant, PE-95, could negoti-
by the middle of 1942 production began.48 ate. Its mobility, then, accorded perfectly
The early months of 1942 saw coming with the needs of America's new motorized
into use nearly all the SCR communication armies. Moreover, its power and reach were
sets which would serve American forces in impressive, not just "100 Miles in Motion"
World War II. The laboratories were at for which the Signal Corps Laboratories
work on newer and better developments, had developed it. On selected high frequen-
some of which would appear in the field cies using sky waves, the 299 could fling
before the war's end as AN types.49 But the Morse code signals for many hundreds of
great majority of combat radios were the miles; this, of course, in addition to serving
SCR's, which had by now passed through as a reliable radiotelephone up to 100
the development stage and were in produc- miles.51 Its range put it in a class with the
tion. smaller of Signal Corps' fixed transmitters,
Now to shift from the smallest of the which contributed to Army's world-wide
SCR's, the five-pound handie-talkie SCR- communication networks.
536, to the largest, the SCR-299. The 299 For fixed radio stations, providing long
channels (continuous wave only) for mili-
had at least one point in common with the
tary purposes, the Signal Corps employed
536—it too had developed as a stopgap,
commercial transmitters and receivers,
only to prove invaluable and indispensable either unaltered or only slightly modified to
in its own right. A giant mobile set, filling meet military characteristics. A common
a truck and a trailer, putting out three to receiver, for example, was the Hammar-
four hundred watts of power compared lund Super Pro,52 used in its commercial
with the 536's one-fourth watt, the SCR-
50
299 satisfied Armored Force need for AF-I, (1) SigC R&D Hist, VIII, Pt. 4, proj 832-C,
rendering unnecessary the contemplated de- p. 8. (2) Weekly Stat Rpt 44, 30 Apr 42, p. 23.
Four of the first SCR-299's had been designated
velopment of AF-I originally planned as for the 835th Signal Service Company, which was
SCR-505 in the 500 series. The 299 came outfitting for the China-Burma-India theater.
However, the company departed from Charleston,
to be used by everyone and his brother, not South Carolina, in the third week of March with-
just by the Armored Force alone, but also out any 299's—all of which occasioned considerable
by the Infantry, by the Air Forces, and by hullabaloo in the Office of the Chief Signal Officer,
the Allies. Production began in the early especially in its Storage and Issue and War Plans
Divisions. See Memo, Col Meade, Dir of Planning,
spring of 1942, when Hallicrafters delivered for Deputy CSigO, 23 Apr 42, sub: Failure to ship
four radio sets SCR-299 with the 835th Sig Sv Co
48
SigC R&D Hist, VIII, Pt. 2, proj. 814-B, pp. (China) with attached R&W's. Evidently no pro-
5-6, 9. For a general discussion of SCR-284, 300, duction sets became available to the field before
511, and 536 see Colton's article in Electrical En- 31 March. SigC 413.44 Radio Sets (EO) Gen.
gineering, LXIV:5, pp. 178-79. 1942-44.
49 5l
SCR nomenclature was replaced during the See below, pp. 363-64.
52
war by a new system which reflected a growing ten- Memo, Brig Gen Frank E. Stoner for Exec
dency to standardize and collaborate among the Control Br, 21 May 42, sub: Prog Rpt, 14-20 May
armed services. This was the Army Navy, or AN, 42 Weekly Achievement Rpts 27 Apr-8 Jun 42,
nomenclature system. SigC Central Files.
THE CALL FOR EQUIPMENT 77
form or adapted as the SCR-244, which amplifier BC-340-A serial No. 4, func-
served Army's intercept and fixed receiving tioned exceptionally well at all times, re-
stations all over the world. As for the trans- quiring only routine maintenance." 55
mitters, the choice related directly to the dis- Still another Federal Telegraph transmit-
tances which a given installation might be ter built for the Signal Corps was BC-447,
called upon to cover. For relatively short a 300-watt high-frequency job much em-
distances of 100 miles or so there was the ployed in China-Burma-India for commu-
BC-460, a 200-watt job built by Collins nication both within the theater (within
Radio. A commercial 250-watt Collins and between points in India and China)
transmitter, the 3O-J, with two Super Pro and outside, to points in Australia especially.
receivers, constituted the first equipment as- Globe Wireless built a 2.5-kilowatt high-
signed to 2d Lt. C. V. Connellan and his frequency transmitter, of which the Signal
team of Signal Corps men serving the Engi- Corps ordered twenty-five sets in April
neers along the Alcan Highway in 1942.53 1942.56
For really long-range communications Such are examples of the fixed radio
the Federal Telegraph and Radio Corpora- equipment which provided Army's commu-
tion provided the Signal Corps with BC- nication and administrative needs5 serving
339, a 1-kilowatt high-frequency transmit- in the corps headquarters throughout the
ter, employed in Hawaii, Alaska, Iceland, States, in Army posts among the several pos-
and Puerto Rico. Coupled with the power sessions, and in the theaters of war. These
amplifier BC-340, this set became a 10- items of equipment also served AAF air-
kilowatt station. Such was Army's trans- way stations. Because they were commercial
mitter in Hawaii, at Fort Shafter, in 1941.54 items and because they were not needed in
Such also was Army's first radio in India, great numbers, their production and sup-
installed by the 835th Signal Service Com- ply were not at all comparable to the hectic
pany at Karachi early in 1942—the first situation touching the SCR's. For example,
Signal Corps radio in the China-Burma- only 136 BC-365's (a medium frequency
India theater which could span the skies 300-watt transmitter built by Federal Tele-
to the United States, though it could do so graph and Radio Corporation) had been
only sporadically. According to Maj. Paul ordered by early 1942: 31 on a 1939 order,
C. Davis, this "Federal Telegraph Trans- 55 on a 1941, and 50 on a 1942 order.57
mitter, consisting of one B A-22 A rectifier,
55
one radio transmitter BC-339-A and power Interv, SigC Hist Sec with Davis (formerly
O/C Radio Teams C and E, Movement 4502-X,
53
Interv, SigC Hist Sec with Connellan (for- Karachi), 24 Nov 44. See below, p. 114.
merly radio operator at Whitehorse, Y. T.), 9 Nov 56
Interv, SigC Hist Sec with Chief Warrant Offi-
43. There were six Signal Corps teams serving the cer George C. McVickers (formerly radio officer
six Engineer regiments that built the road. Connel- in China), 14 Oct 44. (2) Signal Corps Informa-
lan's team, a detachment from the 60th Signal tion Letter, No. 7 (June, 1942), p. 24. (3) Memo,
Battalion, Fort Lewis, Washington, used the Col- Stoner for Exec Control Br, 14 May 42, sub: Prog
lins 30-J sets for fixed work and vehicular SCR- rpt 7-13 May 42. Weekly Achievement Rpts, 27
193's for mobile contacts along the highway. See Apr-8 Jun 42. SigC Central Files.
57
below, pp. 137-38. Descriptive Information on Radio Transmit-
54
Dr. Donald O. Wagner, Army Command and ter BC-365 F and Remote Control Unit RM-10-F,
Administrative Network 1941-1945 (1945), SigC submitted by Federal Telegraph and Radio Cor-
historical monograph E-6, Pt. 1, The Pacific, p. 8. poration (1 Sep 4 2 ) . SigC 413.44 (BC-365)
SigC Hist Sec File. See also below, p. 103. Transmitter.
78 THE SIGNAL CORPS
These fixed radios were telegraph sets, army consisted of 10-kilowatt radio trans-
either hand-operated, by Signal Corps men mitters. These transmitters are being made
pounding out dah-dits on brass keys, or by Press Wireless and are similar to trans-
semiautomatic, s e r v e d by high-speed mitters they use for their news service to all
59
Boehme equipment. In either case they pro- parts of the globe."
vided old-fashioned single-channel radio-
telegraph, or continuous wave, communica- Radio Airborne
tion, which was neither very fast nor very
efficient, as judged by the later standards of In the Signal Corps Aircraft Radio Lab-
radioteletype. This was true of all Signal oratory (ARL) at Wright Field, Ohio, two
Corps' large radio installations, as in Wash- of the most important radio developments
ington, San Francisco, Hawaii, the Philip- early in 1942 were copies, SCR-522 and
pines, and a number of other large central 578. Even the work of copying, ARL left
military establishments. Signal Corps radio largely to industry, limiting itself to the
equipment of greater power than the SCR- work of testing and adapting industry's
299 was of commercial design.58 products to Air Corps' special needs. There
Hitherto, 10 kilowatts was the maximum was, of course, one large exception, com-
power output allowed any Army radio sta- mand radio set SCR-274-N, which the
tion. Until the spring of 1942 only the Navy, Signal Corps, the Navy, and the Aircraft
within the military family, was permitted to Radio Corporation had created together.
shout in the radio spectrum with a louder It was the only powerful command set (suc-
voice. Navy had long employed very pow- ceeding the SCR-183 and 283) available
erful radiotelegraph stations, up to 40 kilo- to American aviators at the beginning of
watts, to communicate with its world-navi- the war, pending American production of
gating ships. The Army had not previously the British VHF set, SCR-522. The 274
wandered so far or so wide on the continents had been in production since June 1941. A
of the globe. But now it would, and by virtue huge number—huge, that is, compared to
of emergency needs, Signal Corps radio for pre-Pearl Harbor standards—had been
the first time exceeded 10 kilowatts. Num- built in the last six months of 1941. The
bers of Press Wireless 15- and 40-kilowatt number totaled 2,722 sets, this being the
transmitters went on order. On 1 May the quantity that Aircraft Radio Corporation
Chief Signal Officer announced in his had delivered through 3 January, coming
monthly Information Letter that "purchase very close to the schedule, which called for
of a number of 40-kilowatt high frequency delivery of 2,850 by 31 December, out of
transmitters has been initiated for use on the total on contract, 28,142.60
long distance radio circuits to task forces. The 274 proved to be an excellent high-
The highest power used previously by the
59
Signal Corps Information Letter, No. 6 (1 May
58
There was one exception, SCR-698, a movable 1942), p. 27. See also Pauline M. Oakes, Army
broadcast station of one-kilowatt power, carried in Command and Administrative Communications
a caravan of trucks. Only a very few were built. (1) System (1945), Pt. II, Signal Corps Domestic Com-
SigC R&D Hist, VIII, Pt. 4, proj. 832B. (2) Hist munications Network as Extended to Overseas Ter-
Rpt SCEL, pp. 442-43. (3) Lt Col L. C. Sigmon, minals FY 1941-15 August 1945, SigC historical
"Sigcircus," Signals 111:6 (July-August 1949), monograph E-5b, p. 39. SigC Hist Sec File.
60
pp. 27-28. Weekly Stat Rpt 28, 10 Jan 42, pp. 2, 6.
THE CALL FOR EQUIPMENT 79
frequency aircraft voice radio. Nearly a demanding not mere thousands but tens of
year earlier, when the Air Corps first began thousands of SCR-274's. Pressed for faster
pressing the Signal Corps to adopt in toto delivery, Aircraft Radio Corporation asked
the British VHF system, including the VHF Col. John H. Gardner, director of the Air-
crystal-controlled command set, Lt. Col. craft Radio Laboratory, to call a confer-
Harry Reichelderfer had spoken up for the ence toward relaxing specification limits and
American SCR-274. The ARL, he pointed to consider substitution for critical mate-
out, already had a project under way to pro- rials. The conference was called on 11
vide VHF components which could be used March. Gardner reported that some relax-
interchangeably with the 274. And the fact ations were allowed when "advantageous,
that the 274 did not use crystal control he particularly if delivery schedules are to be
thought a point in its favor, since the supply improved." But this was a solution that
of crystals seemed most critical at that could scarcely be afforded. Equipment, if
time.61 Though VHF and crystal control inferior or downright defective, no matter
won out, the SCR-274 saw a very great how improved or modern its design, is
deal of service in the war, especially in such worse, if it does not work, than older equip-
areas as the Pacific where it was not neces- ment which does function. A reminder of
sary to co-ordinate with British VHF. In this occurred when the ARL received sev-
March 1942 Col. Alfred W. Marriner, AAF eral receiver and transmitter components of
Director of Communications, informed Lt. the 274 which were worthless because of
Gen. Henry H. Arnold that "the SCR- defective insulating elements.63
274N is a new Army-Navy Standard Com- With far more ardor, the Air Forces
mand set which has been giving excellent pressed the Signal Corps for SCR-522,
service since its adoption." 82 He added, American version of the British VHF com-
however, that frequency control gave some mand set. For radio control of aircraft the
trouble. "The SCR-274N," he told Arnold, British had gone to frequencies above 100
"required careful setting on the ground. I megacycles (the high-frequency SCR-274
suspect that because of inexperience, due originally went only up to 20 megacycles).
care is not fully exercised in setting these VHF embraced more than just command
equipments with a result that all the trans- sets for talk between aircraft, together with
mitters being used in a squadron or flight ground sets so that controlling officers on
are not on the same desired frequency." the ground could direct planes toward the
Although the 274 deliveries at the time enemy or assist friendly pilots back to their
of Pearl Harbor were up to schedule, that fields. It included also a complex net of
schedule, like most prewar planning, fell VHF direction-finder stations on the
far short of what was now wanted. Faced ground, whose operators took bearings pe-
with the realities of war, the Air Corps was riodically on an intermittent signal emitted
61
Ltr, Reichelderfer, Actg Dir of ARL, to CSigO, by friendly pursuit planes every few seconds
28 Mar 41, sub: Ultrahigh frequency radio sets and transmitted over one of the four chan-
for aircraft. SigC 413.44 British Sets, purchase of,
(RB-2331).
nels built into each VHF command set. The
62
Memo, Marriner for Arnold, 21 Mar 42, sub:
63
Cablegram 88 from U. S. Commissioner, New Del- Aircraft Radio Laboratory Progress Report,
hi (to Arnold from Brereton). AAG 413.4-H Com Mar 42, proj. 51, p. 18f. Hereafter referred to as
Equip. ARL Prog Rpt.
80 THE SIGNAL CORPS
gadget which automatically emitted the sig- band range into one set. Rives had argued
nal, the British dubbed "pipsqueak"; for this and won his point.66 American lab-
Americans called it a contactor. All this oratories succeeded in a feat of collapsing
equipment the Signal Corps was feverish- two sets into one, occupying no more space
ly pressing to produce for airmen, who were and weight than the original British TR-
frantic for it even before Pearl Harbor. 1143 had taken up and with only half the
The ground elements, fixed and mobile ultimate frequency coverage.
VHF radio sets, VHF direction finders and The AAF demand for SCR-522 did not
a complex of control center equipment, all stand alone. The British wanted quantities
constituting SCS-2 or SCS-3 sets, were the of these copies of their VHF command set
worry of the General Development Labora- too. In this, as in other cases where they
tories at Fort Monmouth.64 The airborne pressed the United States to copy their
components concerned the Aircraft Radio equipment, they had the good reason that
Laboratory, which specialized in all the they wished to extend their production
troubles that arise when electronic equip- sources. If American equipment were inter-
ment goes aloft where ethereal conditions changeable with theirs, they could fall back
impose many a problem unknown to earth- on American factories when and if their
bound electric circuits. The simplest air- producers were bombed out. Already, two
borne component of VHF, pipsqueak or months before Pearl Harbor, General Olm-
contactor unit BC-608, gave little trouble stead had informed the Assistant Chief of
and was in production by January 1942.65 Staff G-4 that the recently standardized
But not so the SCR-522. This was a pre- SCR-522 was in immediate demand both
cise set having four channels and covering for U.S. Army airplanes and for the British,
an extraordinarily wide band of frequen- who wanted 5,000 sets. The Air Ministry,
cies, from 100 to 156 megacycles. The Brit- because of destroyed factories, Olmstead
ish had originally contemplated two sets to said, "is relying upon deliveries under Lend-
cover this great range of frequencies, all
Lease to provide 250 sets per week begin-
ning the first week in January, 1942." Olm-
of which the multiple needs of aircraft com-
stead asked G-4 to hand down a decision
munication required. But the Americans
upon the allocation of monthly production
had believed it possible to cram the entire between the United States and the United
64
(1) Hist Rpt SCEL, pp. 21 Iff. (2) SCL, An-
Kingdom. Even though America was not
nual Report, 1941, proj. 12-5.1, pp. Iff. yet at war, the AAF would grant the British
65
One hundred sets had been delivered by 3 no sets till its own immediate needs had
January 1942. Weekly Stat Rpt 28, 10 Jan 42, p. been met. General Arnold on 10 October
2. Incidentally, the usefulness of pipsqueak to keep
track of friendly airplanes was already yielding had ordained that no sets could be spared
to GCI innovations employing PPI radar. (For a before 1 June 1942.67
description of GCI and PPI, see Terrett, The
66
Emergency, p. 257.) Some months earlier, Maj. Memo for File, Rives, 7 Apr 41, sub: Conf.
Gilbert Hayden had reported from England SigC 413.44 Gen. British Sets, purchase of (RB-
that contactor fixing was falling off, and that it 2331).
67
was no longer used at night because of universal (1) Memo, Olmstead for ACofS G-4, 4 Oct
reliance on GCI. See Hayden's correspondence to 41, sub: Rqmts for radio sets SCR-522; (2)
CSigO, 23 Oct 41, sub: VHF radio equip in use Memo, Chief of AAF for Col V. V. Taylor (De-
by or being developed for RAF. SigC 413.44 Gen fense A i r ) , 10 Oct 41, sub: SCR-522 sets. AAG
(RB-2164) Memos-London-Maj G. Hayden. 413.4-E Com Equip.
THE CALL FOR EQUIPMENT 81
Bendix Radio undertook the first con- the Under Secretary of War in October
tract for SCR-522, beginning deliveries in 1941. "The British," he said, "have insisted
March when the Aircraft Radio Laboratory that a high degree of secrecy be maintained
put them to test, found minor defects, and on this equipment . . . ." He went on to
corrected them in collaboration with the describe it as "of strictly British origin, the
manufacturer. 68 By the end of the month American action being limited to redesign-
production was mounting. Rives informed ing the set to adapt it to our manufacturing
the AAF that "one hundred fifty-two (152) process to use American parts and tubes and
Radio Sets SCR-522-T2 had been de- to increasing the frequency band covering
livered on March 31. It is anticipated that from 100 to 124 megacycles to 100 to 156
twenty-one (21) more will be delivered to- megacycles." 70
morrow and that in addition eight (8) Just as the SCR-522 was a copy built
SCR-522-A will be delivered tomorrow. under the supervision of the Aircraft Radio
Production is beginning to roll on these sets Laboratory, so too was the SCR-578, the
now," Rives wrote, "and it is believed that curvaceous "Gibson Girl," saving angel of
they will rapidly build up to quite a sizeable many a wrecked aircraft crew adrift on the
figure. The above figures," he added, "ap- sea. Ironically enough, a German set gave
ply only to Bendix Radio Corporation it- the idea. One day in 1941 the British had
self. A number of subcontractors are being picked up an emergency transmitter from
utilized to assemble complete radio sets, but the English Channel. It was the Notsender,
it is not believed that any sets will be de- N.S.2, an ingenious watertight portable
livered by the subcontractors for approxi- transmitter to which a waterlogged airman
mately one month." He estimated that could give energy by grinding a crank,
within three months the total output of energy which would automatically broad-
SCR-522's would attain a peak of 3,000 cast a distress signal to friendly listeners up
monthly.69 to several hundred miles away. The British
Rives may have been a bit overoptimistic. had brought the captured set, along with a
Production figures for the 522 did not begin specification written around it, to America
to appear in the weekly summaries of the in mid-1941, seeking a manufacturer either
Statistical Branch, now under Services of in Canada or in the United States. With
Supply, until the week ending 22 April. their predilection for Bendix, they had ap-
Nor did they snowball as fast as he had an- proached Bendix Aviation Limited, North
ticipated. Bendix was at first the sole pro- Hollywood, California, to undertake de-
ducer, whom for some reason the British velopment of this "dinghy transmitter," as
had preferred. Producing this American they termed it. Both Army and Navy be-
copy of a British radio raised difficulties
came interested after members of the Brit-
comparable to the troubles American man-
ufacturers were having imitating British 70
(1) Weekly Stat Rpt 44, 30 Apr 42, p. 22. (2)
radars. British insistence on secrecy was one Memo, Actg CSigO for USW, 22 Oct 41, sub:
difficulty, as Olmstead had pointed out to Approval of award. SigC 413.44 (SCR-522) 2,
Mar-Dec 41. (3) SigC R&D Hist, III, Pt. 2, proj.
68
ARL Prog Rpt, Mar 42, proj. 47-2, p. 17. 304-A, p. 16. Airborne radio in general and the
69
Ltr, Rives (for CSigO) to Chief of AAF, 3 VHF SCR-522 in particular, for the second half
Apr 42, sub: Shipment of radio set SCR-522. AAG of 1942, are discussed further in Chapter VIII,
413.4-H Com Equip. below.
264-211 O - 78 - 7
82 THE SIGNAL CORPS
THE SCR-578, GIBSON GIRL RADIO. Distress signals were automatically trans-
mitted when the crank was turned (left) and the antenna raised (right).
ish Air Mission in Washington suggested in While the Signal Corps set about getting
August that the Americans prepare a joint the transmitters (deliveries began in the last
specification. The Air Forces, in response to week of May 1942), 72 the procurement of
the Chief Signal Officer's request for mili- antenna-raising equipment gave pause, and
tary characteristics, had at once evinced in- trouble. The 300-foot antenna wire had to
terest. The interest swiftly mounted to a be lifted into the air, either by a kite if the
demand after Pearl Harbor. While Lt. Col. wind was blowing, or by a balloon inflated
George F. Metcalf in the Research and De-
by the castaways, crouched precariously in
velopment Division on 12 December urged
the Signal Corps Technical Committee to sub: Radio set for aircraft type emergency dinghies,
take action on military characteristics with- and three Incls: (a) Ltr, R. Hill, Air Marshal, to
out waiting for the Joint Radio Board to Col Mitchell, Special Subcommittee for Radio
Standardization OCSigO, 18 Aug 41, sub: Stand-
function, General Arnold asked on 24 De- ardization of dinghy transmitters; (b) Ltr, CSigO
cember for 11,600 sets "as soon as humanly to Chief of AAF, 21 Aug 41, sub: Radio set for
possible," requesting the Signal Corps to aircraft type emergency dinghies; (c) Ltr, Brig
place a contract with Bendix Aviation Lim- Gen C. W. Russell, GSC CofS, to Chief of AAF,
22 Sep 41, sub: Emergency transmitter for sea
ited, taking advantage of the development rescue and 1st Ind, Lt. Col W. W. Dick, AAG, to
which that company had already ac- CSigO, 22 Sep 41. AAG 413.4-F Com Equip. (2)
complished upon the original British OCSigO R&W Action 5, R&D to C&E, 12 Dec 41,
specification.71 sub: Tentative Mil characteristics for emergency
transmitter. SigC 413.44 (SCR-578) 1, 1941-42.
71 72
(1) Ltr, Chief of AC to CSigO, 24 Dec 41, Weekly Stat Rpt 50, 11 Jun 42, p. 18.
THE CALL FOR EQUIPMENT 83
their rubber boats. General Olmstead, under Radar Into the Air
pressure from the AAF, repeatedly goaded for Interception and Search
the ARL for information as to when an-
tenna equipment might be expected. He Here and there along the coasts, ground
could not wait for the drawing up of formal radar stood guard to alert the guns, search-
specifications; he wired Gardner on 2 Feb- lights, and interceptors of the defense sta-
ruary. Gardner replied that he expected tions against the approach of enemy air-
Bendix to deliver models of antenna-raising craft, but airborne radar had yet to go into
73
equipment on 9 February. A few days later action. The nation's defenses were eager for
Arnold, irked that Bendix' final sample was it, because the attack upon an outlying ter-
not yet completed, pointedly concluded a
ritory had made continental targets seem
note to the Chief Signal Officer with the
fearfully vulnerable. The country was pri-
sentence, "A dinghy-load of Army pilots,
who are now somewhere in the South At- marily apprehensive of carrier-based attack,
lantic, could give eloquent testimony to the but the threat of long-range submarines to
need for this equipment." 74 coastwise shipping became the dominant
By the end of March the Aircraft Radio menace. To meet either threat, radar was
Laboratory and Bendix Aviation Limited what was needed. Moreover, it must be
were settling upon a production model when radar which was not obliged to accept the
the third sample of the transmitter (BC- conditions imposed by the attacker, as even
778-T2) received tests and approval at the most mobile ground radar had to, but
Wright Field "except for minor mechanical which could move out to find him. To ac-
and electrical changes which can be made quire this degree of range and mobility,
prior to or during early production." As for radar would have to be installed in air-
antenna-raising equipment, Colonel Gard- planes.
ner reported that no satisfactory samples Signal Corps responsibility for research
had yet put in an appearance. But he ex- in airborne radar naturally centered in its
pected something soon, in particular an im- Aircraft Radio Laboratory. For several
proved hydrogen generator (to inflate the
years the laboratory, generally in its Air
balloon), using rare lithium, rather than
Navigation Unit, had pursued various proj-
calcium, hydride. Of lithium hydride there
was only one source (in the Dakotas) and ects of what now had come to be air radar
toward supplying it in quantity the Signal devices. The ARL had not itself done much
Corps lent government financial assistance basic scientific research on airborne radar.
to a number of American producers.75 One of its established principles had always
been that it did not study electronic funda-
73
(1) Teletype, Olmstead to ARL, 31 Jan 42; mentals. For these it depended upon other
2 Feb 42; (2) Msg, TWP-9, Gardner to Signals, 3
Feb 42. SigC 413.44 (SCR-578) 1, 1941-42. research agencies, both of private industry
74
"Ltr, Chief of AC to CSigO, 13 Feb 42, sub: and of the services. In the specific case of
Emergency dinghy transmitter, type SCR-578.
airborne microwave radar, for example, it
SigC 413.44 (SCR-578) 1, 1941-42.
75
(1) ARL Prog Rpt, Mar 42, p. 24. (2) Signal looked to the National Defense Research
Corps Technical Information Letter, No. 19 (June, Committee's Radiation Laboratory, located
1943), pp. 39f. (3) SigC R&D Hist, III, Pt. 2,
proj. 304-G. in the Massachusetts Institute of Technol-
84 THE SIGNAL CORPS
ogy, Cambridge, Massachusetts.76 But the the absolute altimeter. The SCR-518,
applied engineering research required after which the Radar Unit of the ARL was
a basic development in order to produce bringing to a climax at this time, was an
satisfactory military equipment was the instrument which showed the pilot the pre-
laboratory's concern. Consider the fact that cise distance to the ground below by meas-
a model might work well on a laboratory uring the time taken for a radar pulse to
bench but not in a hurtling airplane. The touch the earth and return to the airplane.
business of adapting the model to aircraft It constituted a vastly better altimeter than
installation and to effective operation, while the former barometric type which, giving
meeting both the military characteristics elevation above sea level only, was not a
which the Air Forces demanded and the very precise instrument at best and was of
form which industry could produce, was a no use at all as an indicator of absolute
function combining applied military and elevation—of actual clearance above the
applied production research of a specialized ground. The AAF wanted the radar alti-
and exacting sort, quite different from the meter principally as an aid to bombing
Monmouth laboratories' development of from great altitudes, so as to set the data
ground electronic equipment. Equipment into a bombsight computer like the Norden.
which is comparatively simple to develop The pulsed type of radar altimeter which
for ground use, such as antenna arrays, be- the Radio Corporation of America had
comes a problem when it must be attached been developing in the years just before the
to an airfoil or fuselage. Further problems war had proved to be the answer. The
arise from aircraft vibration, weight and Navy, interested, tried a number of these
space limitations, and from operation at sets, but at first without much regard for
high altitudes where, in thin air, high volt- applications other than mere calibration of
age circuits tend to arc and break down.77 its barometric altimeters. Thinking in terms
One of the most vital airborne radar de- of ocean patrol and of low-level bombing,
vices, useful in both peace and war, was and not of high-altitude and long-range
76 bombardment over land, naval air service
(1) Dr. Henry E. Guerlac, Hist Div OSRD,
Radar, 1945, pp. 421-25 in the consecutively num- planning had tended to neglect the possi-
bered pages of the photostat copy in SigC Hist Sec bilities which the ARL and the AAF im-
File (see Bibliographical Note). In the original 78
mediately perceived.
pagination these pages are Sec. C, Ch. I, pp. 14-16;
Ch. II, p. 1. (2) CSigO, Annual Report, 1942, p. In February- 1942 while the ARL tested
275. (3) Terrett, The Emergency, pp. 185ff. several versions of the absolute altimeter and
Radar was the concern of Division 14 of the developed test equipment to keep the sets
National Defense Research Committee (NDRC),
within the Office of Scientific Research and De- calibrated for peak performance, the pro-
velopment (OSRD). The R&D Work of Division duction prototype SCR-518 arrived from
14 was concentrated in the large secret Radiation RCA factories. Mounted in a B-17 and
Laboratory at MIT. (4) Guerlac, Radar, pp. 7-9
(Sec. A, Ch. I, pp. 1-3). (5) United States Gov- flight tested, the set gave reliable readings
ernment Organization Manual 1952-53, National up to 25,000 feet. This was considerably
Archives and Records Service, GSA (rev. 1 July
5 2 ) , p. 628.
better than the 20,000-foot requirement for
77
(1) Editorial comment, Aug 49, by Col Wil-
78
liam L. Bayer, SigC, JCS, on 1st draft MS by (1) Interv, SigC Hist Sec with Dr. Irving
George R. Thompson. (2) Terrett, The Emergency, Wolff, consultant RCA Labs, Princeton, N. J., 9
pp. 90-91. Feb 50. (2) Terrett, The Emergency, pp. 186-88.
THE CALL FOR EQUIPMENT 85
which the military characteristics called. Still another airborne radar development
Still another version performed well right at this time touched upon the highly sig-
up to the ceiling of the test plane's rise, nificant matter of RCM, or radar counter-
31,300 feet. Even at that altitude, so much measures. It is an easy axiom that every
reserve sensitivity remained in the receiver's new weapon of war brings forth a counter-
reception of the ground echoes that the lab- weapon. Radar was not an exception to the
oratory planned to make further flight tests general rule. Electronic Countermeasures
with smaller antenna arrays which would had been a matter of life or death since the
offer less resistance to the wind.79 British had begun misleading German night
Another important project involved air- bombers by jamming the guide beams
plane identification. It had been obvious which directed the forays over English
since radar's inception that the ability to cities. It behooved American laboratories,
detect aircraft at distances far beyond the too, to study German and Japanese radar
range of vision would be of slight value frequencies and other operating character-
unless some means could be devised to dis- istics in order to develop equipment which
tinguish friendly craft. That accomplished, could, in effect, blind the enemy's sets. On
unidentified airplanes would be presumed 28 February 1942 British commandos
hostile. To this end the U.S. Army and raided Bruneval, just north of Le Havre on
Navy had already begun work on airborne the captive Channel coast of France. The
radar equipment which they called RR, purpose of the raid was to bring back to
for radio recognition. The British called English laboratories a German Wuerzburg,
their somewhat similar development IFF, nemesis of many an Allied plane and the
Identification, Friend or Foe. After the most accurate ground radar in the war until
Americans and the British compared notes the SCR-584 entered combat in 1944.81
on radar, the Americans adopted the Brit- Whether through notice from the British
ish terminology, and by 1942 were adopt- to General Olmstead or from the Radia-
ing their equipment also, despite the fact tion Laboratory to Wright Field, or because
that in some respects the American RR word was coming in of Japanese jamming
was better. In January, while continuing tactics in the Pacific, the ARL recognized
work on the airborne component of RR, the the importance of RCM at about the same
SCR-515, the ARL also went about con- time by setting up a project for "Derax
verting a considerable number of British Warning." (Derax was an early name for
IFF Mark II sets to SCR-535's. By March, radio position finding, which the term radar
the Radar Unit was working also on Ameri- was now, in 1942, generally replacing). It
can versions of a newer IFF, the Mark III 81
(1) Interv, SigC Hist Sec with Sir Robert
and III-G, copied as SCR-595 and 695, Watson-Watt, Vice Controller of Com Equip, Brit-
ish Ministry of Aircraft Prod, Washington, 22 Dec
respectively.80 43, p. 4. (2) James Phinney Baxter, III, Scientists
Against Time (Boston: Little, Brown and Com-
79
ARL Prog Rpts, proj. 31, Jan 42, p. 2; Mar 42, pany, 1946), p. 145.
p. 1. For more details on these radio altimeters, The bold Bruneval raid succeeded. A Wuerzburg
see below, pp. 243-46. radar, entire and intact, was snatched to England
80
(1) ARL Prog Rpt, proj. 63C, Jan 42, p. 9; for study, and contributed to effective Allied Coun-
Mar 42, p. 5. (2) Terrett, The Emergency, pp. termeasures against German aircraft detectors and
190-91, 197, 264-66. For further details on IFF, gun-laying sets. "The Raid on Bruneval," Military
see below, pp. 242-43. Review, XXXI:5 (August, 1951), pp. 94-96.
86 THE SIGNAL CORPS
would not be possible for Allied aircraft inally used for purposes of defense, radar
crews to take effective counteraction against now suddenly became an instrument of of-
enemy radar, either passively, by evading fense. Its potentialities doubled.
the rays, or actively, by jamming, until they Airborne interception equipment had
possessed equipment which could reveal the been an urgent development, it will be re-
presence and frequency of radar radiations. called, since Sir Henry Tizard first revealed
84
The new project, tentatively established it to America in September 1940. It had
pending the receipt of funds, led to the de- been the one British radar application to-
velopment of a panoramic receiver, the tally new to American military electronic
SCR—587, equipped with a radar research. oscil-
like AI sets, as developed to meet the
loscope in which an operator could see the vehement demands of the U. S. military air
impact of enemy radar beams and read their organization, were radars of relatively short
frequency.82 range which, installed forward in pursuit
The demands of the dangerous defense planes, enabled the pilots both to "see" a
situation of the early months of 1942, how- bomber several miles ahead and, by center-
ever, were overshadowing these and other ing the bomber's reflection in their oscillo-
remarkable developments, such as naviga- scopes, to hunt it down. The ARL had
tion by radar. All the problems which the two types well in hand by 1942. The first
ARL was encountering in the development was a long-wave model, calibrated at about
of airborne radar, sufficiently perplexing in 200 megacycles. This was the SCR-540,
themselves, were now compounded by copy of the British AI-IV. It was not a
very good set. For one thing, its one and a
urgency. The two prime needs were for de-
half meter wavelength required large ex-
vices capable of intercepting unseen enemy
ternal antennas, a bane to aircraft design.
airplanes and detecting unseen raiders or
All through the last half of 1941 the ARL
submarines. Both were about to come off and Western Electric had had difficulty in
the first production lines. A3, the airborne adapting this American copy of a British
interception equipment, would enable a pi- set to American airplanes. They were still
lot to "see" his opponent on the instrument having trouble as 1942 began. In January
panel, whether he could actually see him Western Electric samples of SCR-540 com-
ahead or not. ASV, air-to-surface-vessel ponents failed vibration tests and had to go
radar, mounted in a patrol bomber, would back to the factory for modifications.85 By
show up hostile watercraft even though they March the first 80 sets under contract were
might be lurking beneath clouds or dark- supposedly so nearly ready that Colton, Act-
ness. ASV was first included in the BTO, ing Chief Signal Officer during General
or bombing-through-overcast, project, but Olmstead's westward tour, set up a priority
was soon given separate effort because of list for their delivery to radar training
its immediate importance. Air intercept schools. Yet only five sets arrived. And in
equipment came under a project to develop each of them a single component, the Gen-
83
an airborne aircraft detector. Though orig-
84
Terrett, The Emergency, pp. 191ff. See his
82
ARL Prog Rpt, Mar 42, proj. 80, p. 19. Chapter X for AI and ASV developments prior to
83
Ibid., projs. 61C, 71, 77, Jan 42, pp. 5ff, 14; Pearl Harbor.
85
Mar 42, pp. 3, 10, 17ff. ARL Prog Rpt, Jan 42, proj. 71, p. 14.
THE CALL FOR EQUIPMENT 87
eral Electric inverter, failed in high alti- begun receiving them. Meanwhile, the
tude tests.86 ARL went ahead toward the construction
The Aircraft Radio Laboratory's other of hundreds of SCR-520's on contracts
AIset, the SCR-520, employed microwaves with Western Electric, which, in December
ten centimeters long, in the frequency range 1941, had delivered a preliminary produc-
around 3,000 megacycles. It was a much tion model.87
better radar and became available sooner In Air Forces demands, however, AI was
than the SCR-540. When the Tizard Mis- receding in priority. Submarines, not air-
sion brought over the cavity magnetron and planes, were bringing the war to the West-
asked American help toward designing ern Hemisphere, and the Air Corps, which
workable radar circuits for it, London had in 1941 had wanted what applied to the
just then defeated the Luftwaffe day raids war situation of 1941, but which had been
and was awaiting Germany's night bomb- obliged to wait for the planning and manu-
ers. Faced with the need for a better air facture of this equipment, now had the
intercept set than their long wave AI-IV, same problem in a 1942 situation. General
the British sought it in microwave equip- Arnold, chief of the Army Air Forces, was
ment. As soon as the Bell Laboratories could confronted with a double embarrassment.
produce the new magnetrons for generating In the first place, he was not getting anti-
powerful microwaves, the Radiation Lab- submarine equipment. In the second, he
oratory had gone to work on a ten-centi- was getting air interception radars. He had
meter AI (AI-10) and had come up with asked for them, but now found he had no
a model of it early in 1941. Tested at the airplanes ready for them. Here was the Sig-
ARL, this model attained considerable suc- nal Corps, offering more sets of the newest
cess despite its awkward bulk. Though and best AI radar than the AAF knew
heavier—it weighed about 600 pounds— what to do with. Quietly store them, or
than the SCR-540, the new ten-centimeter something, Arnold advised his Director of
SCR-520 used a compact dishlike trans- Air Defense, Col. Gordon P. Saville, lest
mitting and receiving antenna array, two the Signal Corps return with interest the
feet in diameter, which could be mounted accusations which the Air Forces had been
wholly within the plane's nose. In perform- in the habit of lodging with the top Army
ance, this microwave AI radar gave more command. "The first thing you know,''
distinct reflections from targets and suf- Arnold wrote, "we will have a complaint
fered far less interference from undesirable being registered by the Signal Corps to the
ground reflection. Taking a page from Brit- Secretary of War. Isn't it possible to take
ish success with equipment built in a labora- the AI-10's and put them in storage in our
tory, that is, "crash-built," the Signal Corps own warehouses, or do something along
had ordered a number of sets from Radia- that line, so that the Signal Corps won't
tion Laboratory's own shop, the Research have reason for their present feeling of
Construction Company, and had already
87
(1) Ltr, Gardner to CSigO, 25 Jun 41, sub:
86
(1) Msg (no number), Actg CSigO to ARL, Sv test of AI-10 equip. SigC 413.44 SCR-520
12 Mar 42; (2) OCSigO Radar Div R&W Action AI-10 No. 1 (RB-1378). (2) Memo, Rives for
1, 1st Lt Wilbur H. Vance, Jr., to Capt Earl J. Chief of Mat Br, 14 Dec 41, sub: Expediting criti-
Atkinson, 27 Mar 42, sub: Delivery status of SCR- cal contracts. SigC 413.44 SCR-521 No. 1 (RB-
540. SigC 413.44 SCR-540 No. 1 (RB-1383). 1379).
88 THE SIGNAL CORPS
'what's the use of producing these sets when The long-wave version had been another
all we do is store them away.' " 88 British offering. This was their ASV-II, the
Both to the American in the street and to radar to which Hitler is said to have attrib-
89
the American in the Constitution Avenue uted the defeat of his submarines, although
war room, the greatest immediate need was actually the subsequent microwave ASV
for a way to deal with the submarine at- and the related naval ASG sets did more to
tacks which were sinking more and more send the U-boats to the bottom.
ships, often within sight of American shores. The laboratory already had a copy of the
The radar answer was to be ASV. Here ASV-II under way as the SCR-521 and
again, as with AI, two versions lay in the had ordered thousands of them. The first
Aircraft Radio Laboratory's active projects, contract, for about 6,000 sets, was made
a long-wave type and a microwave type. with a Canadian government firm. Re-
88
Hq AAF R&R CG ["H. H. A."] to Dir of Air search Enterprises Limited, at Toronto. A
Defense, 11 Feb 42, sub: Status of AI-10 Cm prod second contract had gone to Philco. In
and instl. AAG 413.4-G C Com Equip. Saville had
89
noted in a routing and record sheet to Arnold on "One Signal Invention," Radar, No. 1 (April,
10 February that the delivery schedule of the 1944), pp. 29-30. SigC Hist Sec File. See also, Wes-
AI-10's was anticipating the production program ley Frank Craven and James Lea Cate, eds., The
for the P-51,
P-61, the new heavy fighter designed to Army Air Forces in World War II, II, Europe:
take it. The smaller SCR-540 (AI-IV) could TORCH to POINTBLANK, August 1942 to De-
be fitted into existing A-20 light bombers, and cember 1943 (Chicago: The University of Chicago
used for training only. In same file. Press, 1949), 316.
THE CALL FOR EQUIPMENT 89
actual production, however, copying British rines but so that they might also maintain
sets was not at all the short cut which the patrols, constantly searching the sea for
General Staff and the AAF supposed. Dif- Japanese aircraft carriers along the Pacific
ferences in American airplanes and in coast and in the Panama area. Late in
American components imposed delays. It January 1942 Robert A. Watson-Watt,
was difficult to tailor the large external an- British radar expert, reporting on the Pa-
tennas of the ASV-II (SCR-521) to U. S. cific coast air defenses, recommended to
aircraft, as Colton explained in mid-March, Robert A. Lovett, the Assistant Secretary
answering insistent War Department de- of War for Air, that both Army and Navy
mands for ASV. Furthermore, faulty oscil- aircraft get hold of ASV-II, as a matter of
loscopes gave trouble. During the winter "highest urgency," in order to maintain un-
months of early 1942, the ARL took pre- ceasing patrol. On 10 February Harvey H.
production models of the SCR-521 up on Bundy, special assistant to Secretary Stim-
flight tests, found flaws in their operation, son, urgently telephoned the Signal Corps'
and had to eliminate the difficulties in con- Radar Division, seeking to find out why the
cert with the two manufacturing companies. delivery was so belated. General Colton at
Before the factories began mass production once had Lt. Col. Gilbert Hayden describe
of the thousands of 521 's on order, the ARL the entire ASV situation. Of the prototype
also mounted, tested, and made ready for ASV-II's, Hayden told Colton, four had
operation a number of the ASV-II proto- been installed, ten were ready for installa-
types which the British had sent over more tion whenever the AAF could supply the
or less complete some months earlier.90 planes, and 18 more were awaiting trans-
Throughout the first three months of mission cable. As for the thousands of SCR-
1942, the Army had to be satisfied with the 521's on order, Research Enterprises Lim-
copy of ASV-II, the long-wave SCR-521, ited had last promised to deliver between
if indeed the Signal Corps could lay hands 50 and 100 before the first of March. The
on it at all, for it was something of a will-o'- Navy had already received nearly 200 sets
the-wisp. Research Enterprises Limited had (not all of them complete) on a prior
91
originally promised to start delivery in De- contract.
cember 1941, but subsequently moved the 91
(1) OCSigO R&W Action 1, Hayden to Vance,
date up to January. When February ar- 10 Feb 42, sub: Bundy re SCR-521 sets; (2)
rived, while coastal shipping continued to Memo, Hayden for Colton, 10 Feb 42. SigC 413.44
SCR-521 No. 2 (RB-1380). (3) Report by Rob-
be sunk in increasing quantity, there were ert Watson-Watt on the Air Defense System of
still no SCR-521 's, the nearest thing to them the Pacific Coast of the United States, Jan 42, Pt.
I, p. 9, Incl with Ltr, CSigO to Dir of SCRL, 8
being the several British prototype sets Feb 42, sub: Rpt. SigC 676 (ET-1439) Air De-
which the ARL was adapting. fense System of the Pacific Coast, Rpt by Watson-
Pressure meanwhile doubled and re- Watt.
Incidentally, one of Watson-Watt's companions
doubled for Army ASV-equipped airplanes, on his Pacific coast inspection tour was Alfred L.
not only so that they could sink subma- Loomis, a kinsman of Secretary Stimson. Loomis
was a pioneer in microwave radar work and sub-
90
(1) Memo, Colton for Lt Gen William S. sequently became head of OSRD's Division 14, of
Knudsen, OUSW, 16 Mar 42, sub: Deliveries of which the Radiation Laboratory was a part. These
radio set SCR-521. SigC 413.44 SCR-521 No. 2 facts doubtless help explain Stimson's very timely
(RB-1380). (2) ARL Prog Rpts, Jan 42, proj. and keen awareness of the new electronic weapons.
61C-1.4, pp. 5f;Mar42,proj. 77, pp. 17f. See Baxter, Scientists Against Time, pp. 33, 141.
90 THE SIGNAL CORPS
SCR-521's from Canada at last began to Colonel Gardner at Wright Field. Twenty-
dribble into the ARL during the first week seven SCR-521's had now been installed,
of March. Meanwhile, ship sinkings were although the Air Forces had not yet been
terrifying. The Navy's antisubmarine op- able to decide what type of airplane should
erations by sea and by air were not enough. be used for ASV. A major obstruction had
In fact, the Navy was somewhat behind- been lack of the several antennas required;
hand with the new airborne radar applica- another was an insufficiency of men and
tions. Because of general military igno- time to do individual installation. The an-
rance of the new offerings of science, the tenna shortage went back to an inadequate
Navy had so far failed "in making full of- allotment of steel tubing to the manufac-
fensive use of new airborne weapons and turers and to an insufficiency of insulators.
devices in the pursuit and destruction of As for trained installation crews, the ARL
the U-boats."92 Fortunately, Secretary had only one, whose members could put in
Stimson kept goading the rest of the mili- but a single set a day. To train additional
tary to keep up with the times. On 18 Feb- crews would require several weeks. Alto-
ruary War Department planners received gether, the most Gardner could foresee was
a memorandum from Bundy awakening that about 150 antenna sets would be on
them to new developments whose progress hand and 33 installed by mid-April. All of
was both so secret and so rapid that "im- this Colton passed on to Knudsen, only to
portant officers of the General Staff and receive another call on the next day, order-
especially those in War Plans Division have ing the delivery rate to be doubled. Gard-
not been and are not currently advised of ner immediately got the word, and was told
their existence, functions and effect on that he would be given double-A priorities
strategy." One of the examples which to break any bottlenecks.94
Bundy cited was the use of "airborne search Meanwhile, very great effort was being
radar as an additional defense for concentrated upon microwave ASV. Prior
Panama."
93 to 1942 both the Aircraft Radio and the
Therefore, it is not surprising that by Radiation Laboratories had accomplished
a good deal with ten-centimeter BTO and
March, since the Navy could not yet cope
ASV equipment. But no sets were ready for
with the submarine and as the General Staff
use. Fortunately, a ready stopgap lay at
learned more about airborne radar, the War hand. One could convert AI-10's into
Department was putting increased pressure ASV-10's, taking some of the sets which the
upon the AAF and the Signal Corps. On Research Construction Company had al-
16 March Lt. Gen. William S. Knudsen, ready built and for which the AAF had no
one of the chiefs of war production, called great use at the moment. One could then
upon General Colton for a report. Colton 94
Interoffice Memo, Rives for Hayden, O. I.
again collected the facts, this time from Lewis, and Vance, 18 Mar 42, sub: Summary of
status of radio set SCR-521 as of 17 Mar 42. SigC
92
Ibid., p. 31. Even after it should have known 413.44 SCR-521 No. 2 (RB-1380). Incidentally,
better, Navy long rejected Army's belief that air- Gardner was required to report weekly on this ASV
borne microwave radar would revolutionize the progress. He more than met the 300 objective by
mode of antisubmarine warfare. See Stimson and mid-April. See Ltr, Gardner to CSigO, 29 Apr 42,
Bundy, On Active Service in Peace and War, p. 509. sub: Rpt of delivery status of radio set SCR-521.
93
Baxter, Scientists Against Time, p. 29. SigC 413.44 SCR-521 No. 3 (RB-1515).
THE CALL FOR EQUIPMENT 91
put the converted sets into large airplanes, Army's first microwave AI-10 had been in
installing them in blisters beneath the fuse- mid-1941. The success of AI-10 had been
lage so that the parabolic reflector would somewhat academic, however; there were
project the microrays downward and the no enemy night bombers over the United
antenna dipole would receive echoes from States. But in the spring of 1942 there were
objects upon the sea. Accordingly, Colonel live submarine targets off U. S. coasts. These
Marriner, the AAF Director of Communi- original microwave ASV's could and did
cations, had sent a request through the Sig- draw blood at once. Their service tests coin-
nal Corps to the Radiation Laboratory "to cided with combat action. The ASV-10, on
modify ten service-test AI-10's into ASV- the assertions of some, sank its first sub-
10's as soon as possible" for installation in marine on 1 April 1942.97 A few days later
B-18's, which workers at Wright Field were Colonel Marriner asked the Signal Corps to
already modifying. In forwarding the re- get 100 sets of ten-centimeter ASV's, either
quest, Hayden had assured Dr. Edward L. standard SCR-517's or modified SCR-
Bowles, head of the Radiation Laboratory, 520's, and demanded that they receive a
that the Aircraft Radio Laboratory would priority "over any other radio equipment
co-operate toward fabricating the correct now being procured." Speaking of "stand-
accessories and installing the complete sets ard SCR-517's," Marriner meant the other
without delay.95 microwave ASV development upon which
The job was done under the utmost the Aircraft Radio and the Radiation Lab-
pressure on all sides. The two laboratories oratories had been working for some
completed the conversion in two months, months. When one of these sets had been
and on 27 March one of the B-18's flew mounted in a B-24 in the spring of 1942,
over Block Island Sound to test its ASV-10 Secretary Stimson himself accompanied it
against the submarine Mackerel. The echoes in a test flight. He returned confirmed in his
came back reliably at ranges up to nineteen 97
miles. By the end of the month, four of the On that date, a B-18 equipped with an ASV-10
detected a surfaced submarine eleven miles away
ten bombers thus equipped were in opera- by means of its radar, tracked the vessel, and at-
tion out of Boston, and the remaining six at tacked it, claiming the first radar-assisted kill from
the air. The claim, it seems, was optimistic, since
Langley Field, Virginia.96 Navy records indicate that the first confirmed sub-
Designated SCR-517-A, these ten sets marine kill made by an Army bomber came off the
Carolinas on 7 July 1942, the U-701 being the
were as phenomenally successful as the victim. However that may be, by as early as 28 May
Army airplanes had already made 103 attacks on
95
(1) Ltr, Chief of AAF to CSigO, 5 Jan 42, enemy submarines. (1) Baxter, Scientists Against
sub: Modification of AI-10's to ASV-10's; (2) Time, pp. 42, 150. (2) Samuel Eliot Morison, His-
Ltr, Hayden to Bowles, 17 Jan 42. SigC 413.44 tory of United States Naval Operations in World
SCR-520 No. 2 (RB-1705). War II, I, The Battle of the Atlantic: September
96
(1) Submarine Tests Using Radiation Labora- 1939-May 1943 (Boston: Little, Brown and Com-
tory ASV-10 Equipment in B-18 Army Planes, 29 pany, 1947), p. 247n; 156. (3) Incl, AAF Hq, First
Apr 42. SigC 413.44 SCR-517A No. 1 (RB-1375). Air Force, Mitchel Fld, 1 Jun 42, sub: Notes for
(2) Memo for Red, Rives, 4 Apr 42, sub: Maint of conf re improvement in antisubmarine opns, with
ASV Equips. SigC 413.44 SCR-521 No. 3 (RB- OCSigO R&W Action 1, Lanahan to Dir of Supply
1515). (3) The Army Air Forces, I, 527. The AAF Svs, 8 Jun 42, sub: Improvement of antisubmarine
historians, emphasizing the equipment shortages, opns and dev of an antisubmarine unit. SigC 413.44
mention only the four radar bombers at Boston. SCR-517-ANo. 3, Jul 42 (RB-1377).
AIR ATTACK ON A SUBMARINE. Such attacks were frequently the result of airborne
radar discovery of the enemy.
THE CALL FOR EQUIPMENT 93
enthusiasm, and redoubled his drive to in- CHL." This copy was being built in Can-
troduce the sets.98 ada by Research Enterprises Limited,
which was also helping to produce the air-
Ground Radar: The Continuing borne SCR-521 ASV-II radar. It had been
Exigencies of Coastal Defense requisitioned by the Army Air Forces and
was already part of a dispute which
When Field Laboratory No. 3 in the area reached a climax that spring.
of Sandy Hook became the Signal Corps In the 268, 270, and 271, the Signal
Radar Laboratory in January 1942, it had Corps Laboratories had developed ground
thirty-six ground radar projects under way. radars which for their day were very good.
The Coast Artillery Corps was well satis-
These projects were intended to serve a
fied with the SCR-268 for searchlight con-
variety of functions. They were for direct-
trol. But officers of the Air Corps who had
ing searchlights, SLC sets SCR-268 and seen British CH or CHL sets, or who had
541; for giving early warning of approach- heard enthusiastic descriptions of their ap-
ing aircraft, EW sets SCR-270 and 271, to- plications, tended to dismiss the SCR-270
gether with several modifications under de- and type 271 as a "piece of junk." 100 Gen-
velopment to determine target elevation; erally, during 1941 and early 1942 they
for detecting surface vessels, coast defense wanted Chinese, that is, exact, copies of
(CD) sets SCR-296 and 582; for ground- British sets.
controlled interception, GCI sets SCR-516 Yet the performance of the Signal Corps
and 527; for gun-laying, GL sets SCR-545, equipment was individually not inferior to
547, and 584; and for identification, RR comparable British sets, and in some re-
sets SCR-532 and 533, designed to query spects was better. Furthermore, Signal
the airborne SCR-515. Radar was rapidly Corps sets were unsurpassed for ruggedness
growing and changing. Three radars were and engineering. Colonel Corput could say
so new at this date that the laboratory had with good reason that "at the time that the
not yet assigned them project numbers. Of 99
Signal Corps Radar Laboratory Progress Re-
these, two were developments of microwave port, Jan 42, pp. 1-2. Hereafter referred to as
circuits which the Radiation Laboratory SCRL Prog Rpt. AB-2363, Evans Sig Lab File,
Belmar, N. J. The L in CHL stood for Low because
had created about the cavity magnetron. the set could detect targets at lower elevations than
These, the XT-3 and XT-1 sets, became, its predecessor, the CH, could. For a descriptive
list of army ground radars see Terrett, The Emer-
respectively, the SCR-582, a fixed radar gency, Appendix, Signal Corps Equipment, World
for harbor protection, and the SCR-584, War II.
100
A Signal Corps officer, 2d Lt. George D. Fogle,
the remarkable mobile gun layer. The third who first studied in England as an ETG student
set was the long-wave SCR-588, at first a and then moved over to the Air Corps to work in
copy of the British Chain Home Low, or air defense under Colonel Saville, so characterized
the SCR-270 while comparing its performance with
the GCI application of British CH and CHL sta-
98
(1) Memo, Marriner for Hayden, Radar Div tions, an application which the designers of the orig-
OCSigO, 9 Apr 42, sub: Proc of ASV-10 sets. SigC inal 270 had never contemplated. Ltr, Lt Fogle to
413.44 SCR-517A No. 1 (RB-1375). (2) Baxter, Hayden, 17 Mar 42, sub: Summary of a discus-
Scientists Against Time, pp. 33, 42, 149. (3) Guer- sion with Col Green of the AW school at Ft. Mon-
lac, Radar, p. 433 (Sec. C, Ch. II, p. 9). See below, mouth, 16 Mar 42. SigC 413.44 SCR-527-627-
Chapter IX, for further details on airborne radar. 12K (RB-1381).
94 THE SIGNAL CORPS
102
Radio Set SCR-268 was placed in produc- this were also mobile. Yet the two at-
tion, insofar as is known, there was no radio tributes could not be combined in a long-
set in the world equal in performance." 101 range long-wave set. The British equivalent
It was compact and mobile and could de- of the 270, the CH stations, gave approxi-
termine azimuth, nearness, and elevation mate target elevation, but at the cost of mo-
for ranges up to 24 miles. During 1940 and bility, for they had to use several antenna
1941 it had been the best searchlight con- arrays which pinned the sets to very fixed
trol radar in existence. The SCR-270 and positions indeed.
271, built to use a three-meter wavelength, There were also various inherent limita-
twice that of the 268, were slightly less suc- tions of the early radars which scientists did
cessful in earlier models, but they too were not at first understand. Army Air Forces
rugged. Moreover, the 270 was mobile. It observers, for example, had been impatient
had plenty of power and a range extending with what they felt to be the limited per-
to 150 miles, and completely met the early formance of radar during the late-summer
requirements of the Air Corps for detection Louisiana maneuvers of 1941. Lovett and
of aircraft at long ranges. Bundy had accordingly been hard on the
Unfortunately, the Americans had not Signal Corps. A widely shared ignorance of
yet learned how to use it well. The British, the abilities and limitations of mobile radars
on the other hand, working with large teams had led Lovett to write an adverse report
of researchers and military users, on a scale because the sets could not detect airplanes
undreamed of in the United States before approaching at levels below 3,000 feet.
1940, had learned to make full use of their Soon afterward, Bundy had called upon Lt.
fixed radars to an extent which America Col. Eugene V. Elder in the Materiel
had not yet done with its mobile sets. The Branch for facts. These Rex Corput, then a
same British radar towers, if erected along major and the director of the Signal Corps
the Florida coastline, might well have de- Laboratories, had supplied. At the maneu-
fended a comparable area from air attacks vers, he pointed out, SCR-270-B's were
originating in Cuba or the Bahamas; but detecting airplanes at elevations as low as
700 feet when the planes were as far as 35
an entire continent would still have
miles away, and at elevations as high as
stretched undefended beyond. British CH 5,000 feet when the planes were as much as
radars could not move to new locations. 100 miles distant. This constituted good
The SCR-270 could. In the absence of any normal performance for a radar, which of
attack, and in a geography vastly different, course cannot be expected to "see" over the
American radar had not yet begun to capi- curve of the horizon, because very high fre-
talize its virtues or to understand its limi- quency radiations follow the line of sight
tations. To have an SCR-270 which could tangent to the curve of the earth. The per-
determine elevation as well as azimuth and formance in Louisiana seems even to have
range would be good, the AAF thought; it excelled that of British detectors in respect
would be better if the set able to do all of to low coverage. "It is of interest to note,"
Colonel Colton remarked concerning Lov-
101
1st Ind, Corput to CSigO, 15 Feb 42 (p. 9) ett's criticism, "that the low pickup angle
on Ltr, CSigO to Dir SCL, 8 Feb 42, sub: Rpt.
102
SigC 676 (ET-1439) Air Defense System. Terrett, The Emergency, pp. 124-25, 128.
THE CALL FOR EQUIPMENT 95
of the SCR-270-B's is one third that of shell. Blasting Signal Corps radar equip-
the long-range British equipment for equal ment and radar training, it exploded also
heights of site." 103 against the AAF, the General Staff, the
Weaknesses in the early American ground Western Defense Command, the Coast Ar-
radars lay more in their application than in tillery Corps, and everyone else in sight.
the sets themselves. Skilled crews could get Watson-Watt, a brisk little Scotsman of al-
excellent results with them, but few opera- ternating ability to charm and to infuriate,
tors of that sort were yet available. In Eng- saw nothing good in American military
land, there were very many, women, as well radar.
as men, who were both trained and battle Watson-Watt saw a multitude of reasons
tested. In the American forces, although why American radar, radar sites, radar or-
Signal Corps crews had been operating ganization, radar planning, and radar
270's and 271's spotted along the coasts of operators were not good. He pointed at
the United States, Iceland, Panama, and shortcomings in operators ("ill-selected,
Hawaii, they had often lacked adequate ill-trained, inadequate in numbers, and
training, as Private Lockard's Sunday morn- only transitorily within [the] Western De-
ing practice at Pearl Harbor had illustrated. fense Command"). He noted bad plan-
Moreover, the commands responsible for ning at top levels, declaring that the distri-
defense doctrine knew little more about the bution of responsibility for planning be-
potentialities of radar than the untrained tween the War Department and the com-
operator knew about the individual set. Ad- mands was indefinite and illogical and
mittedly, air defenses were poor. singling out staff deficiencies in several
During the first two weeks of January other respects. In his opinion, the higher
1942, and at the request of Lovett, Watson- commands did not realize the inherent
Watt inspected the air defenses of the Pacific technical limitations of radars. "There is
coast. Watson-Watt, then the foremost Brit- no sufficiently firm staff realization," he
ish radar authority and the engineer who said, for example, "that Radar screen can
had proposed in 1935 the aircraft detection be made to give smooth continuous tracking
system which produced the CH stations, was in high raid densities; that the provision of
individual stations each working tech-
scientific adviser on telecommunications to
nically well would not suffice to produce a
the British Air Ministry. Accompanied by
coherent system; that such a system is es-
Colonel Saville, one of the AAF's most vig- sential to controlled interception by pur-
orous advocates of radar, he hurried through suit units; and that controlled interception
a speedy inspection and followed it by a is the only economical system of air de-
devastating report. The report was a bomb- fense." He observed in particular that the
103 site is such an integral part of the radar
(1) Memos, Elder for Colton and Colton for
Olmstead, 19 Sep 41. SigC SPSTP 10. (2) Memo, station that it all but controls the perform-
Maj Maude for Actg CSigO, 7 Oct 41, sub: Rpt ance and, in making this observation,
of observation, Second and Third Army maneuvers,
pp. 7 f f ; (3) Notes on Observer's Tour—Combat added, "For this reason, Radar can never
Maneuvers Second and Third Armies, 17-23 Sep be truly mobile."
41, signed by Col Mitchell, 25 Sep 41, p. 5. SigC He swept the mobile SCR-270 aside.
354.2 Second Army Maneuvers 1942 (Aug-Oct
41) (AR-110). "The only available shore-based Radar
96 THE SIGNAL CORPS
screen equipment SCR-270," he wrote, "is areas to defend and who thought in terms of
technically and operationally gravely un- shifting the detectors to this or that threat-
suitable . . . ." Some of his criticisms of ened area. Corput attributed Watson-
the 270 were justified, although generally Watt's extreme critical attitude to "a
they referred to defects to which all long- characteristic evident in many engineers,
wave radars are subject. Others were be- the tendency being to compare the latest
side the point. In its original specifica- developmental equipment which they have
tions, for instance, the Air Corps had en- seen [in laboratories] with the equipment
visaged a set for early warning only, but which they actually encounter in the
Watson-Watt now objected to the "lack of field."104
height-finding means" in the set, which had Making use nevertheless of seemingly au-
never been designed to have them. One thoritative contentions, the Army Air
comment in particular must have stung the Forces continued to urge British radar sets,
Signal Corps radar officers: his assertion which they believed superior to anything the
that "the average dependable range of lo- Signal Corps had built or could devise. In
cation does not exceed 30 miles." a 1941 rumpus which had threatened Sig-
To some of Watson-Watt's comments nal Corps control of electronic development
Colonel Corput, now head of the Signal and procurement, the Air Forces had al-
Corps Radar Laboratory, wrote a pointed ready insisted that the Signal Corps copy
rebuttal. Taking the matter of the SCR- the original British GCI.105 A sample had
270's range, he calculated it at four or five reached Field Laboratory No. 3 in October
times what Watson-Watt allowed it. "Its 1941 and General Electric had taken on a
reliable maximum range is limited [only] by contract for 210 sets; but it would be the
line of sight or 150 miles, whichever one is spring of 1943 before a production model
the lesser," Corput said. The higher an air- would actually appear as SCR-527. Wat-
plane flew, the farther an SCR-270 or 271 son-Watt's report had even recommended
could "see" it. So low an average depend- for some locations the old British CH radar,
able range as 30 miles, Corput explained,
which "floodlighted" the areas it surveyed
"would obtain only in the case of a low
with a continuous flow of long-wave pulses
height of site and a low flying aircraft," and
he might have added that under those cir- radiated from fixed antenna arrays at
cumstances the same would be true of the heights of several hundred feet. For many
range of the CH, the CHL, and the new locations, he declared that the American
CHL/GCI. Corput granted that on many SCR-270's on the west coast ought to be
points the report would be valuable to the 104
Ltr, CSigO to Dir of SCRL, 8 Feb 42, sub:
Radar Laboratory and to the services which Rpt, with following Ind and Incl: (1) 1st Ind,
used Signal Corps radars. Yet it was obvious, Corput to CSigO, 15 Feb 42, pp. 2, 13ff, and (2)
Rpt by Watson-Watt on the Air Defense System
he added, that it was based on a cursory sur- of the Pacific coast of the U.S., Jan 42, Pt. I,
vey. It was also obvious that Watson-Watt passim. SigC 676 (ET-1439) Air Defense System.
See also The Army Air Forces, I, pp. 291-93.
knew nothing of the reasons why the Amer- 105
GCI, ground-controlled interception, employed
icans had developed radar as they had. a new type of oscilloscope, the plan position indi-
cator, or PPI, which presented a round maplike
Mobility, for example, had been paramount radar picture of the area under observation. See
in the minds of the planners, who had vast Terrett, The Emergency, pp. 256ff.
THE CALL FOR EQUIPMENT 97
replaced by British CH I/GCI sets equipped of fixed protection for them, the Aircraft
with continuously rotated antenna arrays Warning Service desired a screen like that
and with plan position indicators. Research girding the British home island.
Enterprises Limited, the Canadian firm, In February Colonel Saville pressed Wat-
was supposed to be manufacturing them in son-Watt's demand that the Signal Corps
sufficient quantity as SCR-588's. get CH radars. The British had evolved two
The equipment would be a combination less ponderous forms of their original Chain
set which could be used as a GCI in some Home, the MRU and the TRU, mobile and
locations. Known as a CHL/GCI, it would transportable radio units, respectively, but
serve as either but not as both, according even the MRU was not mobile according
to its location. If the site were a high cliff- to American definition. On 18 February, in
like spot, the set would be CHL, to provide a spirited conference of AAF, Signal Corps,
long-range detection and good low coverage, and British representatives including Wat-
but not target elevation; if it were a flat or
son-Watt, Saville indicated the AAF sup-
somewhat bowl-shaped area, the set would
port of British models:
function as GCI, thereby permitting rough
height finding, for control of interceptor What is the answer [to early warning and
planes. But in order to serve as a GCI, the ground control of interception]? We have a
more or less mobile piece of equipment in the
set would require a location almost impos- GCI and CHL that we are talking about that
sible to find. It was supposed to be placed can be interchangeably used simply depending
in a sort of shallow bowl, very flat in the on the site. [But] it does not give the entire
center, level to plus-or-minus four feet for a early warning coverage that we want. Some-
half-mile radius around the set, level to plus- thing else [is] required now. What is the addi-
tional thing? In my opinion, it is the thing the
or-minus eight feet for another half-mile British have developed: floodlight of area by
beyond that, and rimmed round at a dis- MRU.
tance of three or four miles by a low ridge
of rising land. In Corput's words, "A care-
After suggesting that the Signal Corps
ful reconnaissance covering many hundred procure 100 MRU sets from England, Sa-
square miles in the Northeastern part of ville went on to argue for a dozen or fifteen
the United States has failed to locate an CH sets also, to provide early warning pro-
area even approximating this require- tection immediately to the coastal cities. In
ment." 106 this he received support from Watson-
The CHL/GCI in either usage would be Watt's view that only radar at very low
practically a fixed installation, and in this frequencies could detect aircraft at great
respect a step backward. The requirement ranges. "There is no other system known,"
for mobility had been written into the orig- the Scotsman said, "than 20 to 30 mega-
inal Air Corps request for radar. Subsequent cycles which will give us location at 150 to
combat experience would prove the correct- 200 miles . . . Low frequency," he cate-
ness of the requirement. But during the early gorically concluded, "is essential to long
107
months of 1942, so long as the United States range." Summing up the air defense
feared for the coasts and thought in terms
107
His view would be refuted before the year was
106
1st Ind, Corput to CSigO, 15 Feb 42, p. 4, cited out by such microwave radars as the Radiation
n. 104. Laboratory's MEW. See below, pp. 261-62, 274-75.
264-211 O - 78 - 8
98 THE SIGNAL CORPS
situation in America, Saville painted a dis- just about the usual attainment of the
mal picture: SCR-270 and 271.108
After the surprising and lethal weakness
We do not have sufficient distance cover-
age, early warning, no control device of any of the Hawaiian air defenses at Pearl Har-
kind; we do not have a sufficient reliability bor was revealed (a weakness in the radar
and pick-up of a sufficient distance in any of warning system, not in the SCR-270 itself),
the forms that we now have. Things are corn- American military men, worried before, felt
ing along such as gap filling, but until you get
them you still have such gaps in the pattern
real anxiety. A Japanese carrier attack upon
that the performance cannot be relied upon the Canal seemed imminent, most probably
to give accuracy. Whether the 270 can be at low level. Planes skimming in over the sea
made into the thing described as CHL, I don't would not only escape visual detection until
know and don't care ... At the present the last moment but would completely elude
time our view is that it is not mechanically
operationally satisfactory and that its early
search radars, too. This fact greatly dis-
warning characteristics are such that it does turbed General Andrews and his signal offi-
not do the job to compare with other equip- cer, General Ingles.
ment. I am talking about part of a system. Ingles wrote to Olmstead that he had re-
The 270 is good if you put it on a small island peatedly tested the four radars guarding the
where the problem is not one of tracking but
of discovery [but is not suited to continental Pacific side of the Canal, sending low-
GCI]. flying planes in from the sea against them,
but had never got any results. If the Signal
Obviously the Army Air Forces did not Corps had any suitable equipment, he
much care for American search radars. wanted to know about it. "As you know,"
True, the SCR-270 could not be worked
he wrote, "secret developments are kept so
into a GCI system until it could determine
secret that we officers in the field are in en-
target elevation readily and until gaps in
tire ignorance of [them] . . . ." He re-
its coverage could be filled. But the Signal
vealed incidentally that he did not share the
Corps Radar Laboratory was hard at work
general AAF opinion that British sets were
at this very time upon such devices, even
superior, and concluded with a proposal for
though the set might be reduced to immo-
visual warning stations aboard ships
bility. The 270 was good, as Colonel Sa-
equipped with radio.
ville admitted, for simple aircraft detection,
A week later Olmstead answered, assur-
for "discovery," as he put it. Despite his
implication that its range and reliability ing him that the Laboratories were at work
were poor, both were good if the set was on solutions. As for the alleged superiority of
well operated. Colonel Hayden pointed out British equipment, he thought it "not a
in this conference that Watson-Watt tended question of difference between English and
to exaggerate the range (150-200 miles) 108
Memo, six pages, unsigned, for O/C Radar
of the celebrated CH. The operator of a Div, 21 Feb 42, sub: Meeting to further discuss
CH station which Hayden had visited some American GCI equip. SigC 413.44 British GCI
(RB-2330). For another six-page version, see
months earlier in England had told him Memo, Norman A. Abbott, Associate Radio Engr,
that the utmost range the station had ever for O/C Radar Div, 21 Feb 42, sub: Conf for dis-
cussion of Air Corps rqmts for GCI/CHL equip
attained was 152 miles, while the average and radio set SCR-527-A. SigC 413.44 SCR-527
daily maximum was about 110 miles, or (RB-1381).
THE CALL FOR EQUIPMENT 99
American equipment, but rather a question the Navy come in at the last moment and
of the condition under which the respective demand control of the flotilla.109
equipments have been tested." The British Meanwhile, the Signal Corps Radar
CHL, he granted, did handle low-flying Laboratory was seeking solutions: convert-
planes "reasonably well," not only because ing the SCR-268 to the SCR-516; in-
of its lower frequencies but also because of corporating the superior British PPI
the "geometry of the situation," that is, the cathode-ray tube; including additional an-
tennas and providing different frequencies
favorable nature of the United Kingdom's
in the same set in order both to fill gaps and
coastal terrain. He did add, though, that
to provide target elevation data. The Air
he had already ordered four British CHL/ Force continued to press the Secretary of
GCI radars from Canada—as he indeed War and the General Staff for British radar.
had, on pressure from Secretary Stimson. When Watson-Watt reported on the air
Olmstead was going to replace four of the defenses of the west coast, Secretary Stim-
268's in the Canal Zone area with versions son arranged for General Colton to confer
modified for better low coverage, presum- with C. D. Howe, the Canadian Minister
ably SCR-516's. And in collaboration with for Munitions and Supply. Colton sought
the Air and General Staffs he had been 109
(1) Ltr, Ingles to CSigO, 7 Feb 42; (2) Ltr,
working out plans for 50 warning boats such CSigO to Ingles, 14 Feb 42. SigC (EO) 413.44
as Ingles had recommended, only to have Radar Equip Gen 1942-44.
100 THE SIGNAL CORPS
to get 100 CHL/GCI's as soon as possible. ing Service, as well as to the Signal Corps
He also wanted four sets for Panama which which developed, procured, and main-
were CHL's only, for which Secretary Stim- tained the equipment.
son had taken direct action. The President This time the Air Forces rose to the chal-
himself had specified them.110 lenge. Maj. Gen. Davenport Johnson, com-
For Watson-Watt was now shifting his manding the Sixth Air Force at Albrook
critical talents to the air defenses of Pana- Field in the Canal Zone, wrote a defense
ma. He arrived there on the first of March. comparable to Corput's rebuttal of the west
He began a report to the War Department coast report. Watson-Watt had been over-
a week later by stating that the ground de- critical, Johnson believed. Many flights
tector system then in operation recorded were not detected because they were train-
not more than 15 percent of all flights and ing planes proceeding inland over moun-
that the number on which the evidence tainous terrain, where the pick-up efficiency
could be used operationally was much of the long-wave radars of that day was very
less.111 On one occasion he had observed low. Along the water approaches to the
that although there were thirteen planes in Canal, efficiency had been computed at 59
the air, the operations board in the infor- percent by comparing Aircraft Warning
mation center had showed only one. In Service plots with known flights; over land
a C-41 he had flown at various altitudes approaches, it was 15 percent. But the "effi-
up to 10,000 feet, only to find on landing ciency of the entire system at the present
that the Aircraft Warning Service had time," Johnson asserted, "is 52 percent."
failed to plot any part of his flight. In Watson-Watt had stressed the defects with-
short, so bad in his opinion was the Air- out noting that the Americans were well
craft Warning Service in this most vulner- aware of them and were correcting them,
able Zone, upon which the military had Johnson declared, and concluded: "It is an
been concentrating its best efforts for some excellent report and of great value to the
time, that he concluded "no measures 6th Air Force. However, it was written as
which are economically possible within the constructive criticism of the system from a
next two years" could provide a ground short inspection, with no background as to
warning service which would be as much as the efforts of the 6th Air Force or higher
80 percent reliable. These were devastating authority to improve the system. ... In
opinions to the Secretary of War, to the the main, the defects may be charged to
General Staff planners, and to the Army shortage of equipment, 112
trained personnel,
Air Forces, which was responsible for co- and transportation."
ordinating and utilizing the Aircraft Warn- As in January for the west coast, so now
in March for the Canal Zone, Watson-Watt
110
Incl 3, Notes of Meeting with Howe 1700 urged that the SCR-270's and 271's be re-
hours 2-13-42, on Memo, Colton for CSigO, 16
112
Fed 42. File cited n. 109. Maj John H. Baker, Communications and
111
Secretary Stimson had requested this inspec- Radar in the Area of the Caribbean Defense Com-
tion and had asked that Watson-Watt report to mand 1940-1948 (1948), pp. 131ff; App. I, Brief
him personally. Memo, Col Hoyt S. Vandenburg,of Mr. Watson-Watt's Detailed Report; App. II,
Asst Chief of Air Staff A-3, for CofS, 25 Feb 42,
Comments by Gen Johnson on Watson-Watt's Re-
sub: Inspect of air defenses of Panama Canal port, Ltr, Gen Johnson, Sixth AF, to CG CDC, 2
Dept by Watson-Watt and party. AG 333.1 May 42, sub: Comments and recommendations on
(2-25-42) Regarding Watson-Watt. Rpt made by Watson-Watt. OCMH.
THE CALL FOR EQUIPMENT 101
placed as quickly as possible by Canadian tive detector system left many a loophole,
models of the CHL/GCI. He would give and it was well that no enemy attempted to
first priority, he said, to the XXVI Inter- blast the Canal.
ceptor Command's need for a ground-con- Five days after Watson-Watt's Panama
trolled interception system, and second pri- report, another Washington conference
ority to sites on the Caribbean approaches, boiled up to discuss the situation. Signal
which he thought virtually undefended. Corps men, Air Forces men, and Britishers
Since the CHL/GCFs were not available at once again debated, among other things,
the moment, he granted that the 270's and the distribution of the 588's which they an-
271 's would have to be tolerated in the ticipated. Watson-Watt had urged four
interim, but in his opinion they were such CHL's and two GCI's for the Canal
very poor pieces of equipment that even Zone at once. That meant SCR-588's,
British operators would be unable to get which the Signal Corps had been seeking
very good results from them. He doubted if to obtain from Research Enterprises Lim-
American operators could ever be taught ited since January. None had been deliv-
much. Those crews which he had observed ered. Indeed, Research Enterprises was
had shown so little interest in their work having some difficulty with its design and
that they had not even taken the trouble to production. General Colton wanted some
plot permanent echoes, he pointed out. For sets to use for training of operators, a rea-
example, the staff officers of the XXVI In- sonable desire in view of the basic deficiency.
terceptor Command had suspected a large "I think it is foolish," he said, "to send
error in the bearing data given by an SCR- equipment without training personnel. It is
270 at Pueblo Nuevo, near the city of Pan- idiotic." But he lost his point. Suppose that
ama, but no one had bothered to make the the Japanese attacked the Canal and that
quick and simple cross-check of comparing the War Department had no 588's there, as
indicated bearings with the known bearing General Marshall had ordered. Whether
of a prominent part of the landscape. These there was anyone trained to operate the sets
personnel deficiencies should have surprised or not, they at least had to be in place. Col-
no one, for with the explosive expansion of onel Marriner said, "We will fix up Pan-
the Aircraft Warning Service after 7 De- ama or else." Colonel Meade of the Signal
cember 1941, first the Signal Corps had Corps agreed. "I have had considerable
been raided and drained of its relatively few dealings with the Panama situation," he
trained operators and then men had been said, "and it is my firm opinion that if any-
taken indiscriminately from anywhere.113 body in this room decides anything is ahead
Although SCR-268's, 270's, and 271's of Panama that person will soon occupy a
had been in the Canal Zone for some time,
different position from that which he now
neither the engineers who had made the
holds."114
installations nor the crews who worked the
General Colton had ordered 100 of the
sets wholly understood them. As matters
Canadian-manufactured sets. Then, as he
thus stood in March 1942, Panama air de-
fenses were weak. Even a 50-percent-effec- 114
Memo for File (unsigned), 13 Mar 42, sub:
Notes of conf to discuss situation with respect to
113
Ibid. See also The Army Air Forces, I, 299- CHL in Panama with reference to detector equip.
302. SigC 413.44 SCR-588 No. 1 (RB-1388).
102 THE SIGNAL CORPS
explained, he had raised the total to 104 without height-finding characteristics. Pro-
because the word had come down from Pres- duction of the CHL/GCI combinations,
ident Roosevelt for the first four to go to designated SCR-588-B, began so slowly
Panama. Research Enterprises Limited was that by June the Signal Corps had received
just now producing them. CHL's only, they for the Air Forces only ten 588's in all. The
did not have the height-finding equipment tenth was the first CHL/GCI to be delivered
which both the Air Forces and Watson- to the United States.116 Far from replacing
Watt himself had assumed that they would at a sweep the American 270 and 271, as
have. They would not be able to serve as Watson-Watt and the American top com-
GCI's, the very application so much em- mand had expected, operational 588's would
phasized for the west coast and for Panama. remain relatively few right through to the
Nor had the combined CHL/GCI yet been end of the war. But the U. S. Army's origi-
perfected. Watson-Watt had asked in Jan- nal radars, designed by the Signal Corps and
uary for CHL/GCI's to replace the 270's built by American industry, would multiply
and 271's on the west coast. Now he was in numbers and in combat applications.
asking for them again, in March, for Pan- The SCR-268, 270, and 271 proved them-
ama. selves everywhere in the field during this
If there was any good in this ill wind, it winter and spring of the first year of the
117
was that it helped to demonstrate to the Air war.
Forces the difficulty in designing and pro- Thus during the first six months of World
ducing intricate apparatus. A Canadian fac- War II, the Signal Corps struggled to meet
tory producing British equipment was its equipment and troop requirements. Its
experiencing the usual trouble and delay. schools, laboratories, and procurement or-
A Signal Corps team journeyed posthaste to ganizations were getting into motion on the
Toronto and spent three days in ascertain- scale necessary to supply the unprecedented
ing the facts. One member of the group was quantities of men and material which were
John J. Slattery, chief of the Radar Labora- needed for a global war. Meanwhile, until
tory's System Engineering Section. After the the flow could increase substantially beyond
initial meeting with the Canadians on 14 the first trickles, such signal troops as were
March, he reported that Research Enter- already in the field or soon to arrive there
prises Limited admitted that, although a had to serve with what little they had or
prototype model was well along, there was could acquire.
115
not any CHL/GCI. 116
(1) Ltr, CSigO to CG AAF, 5 Apr 42, sub:
The Canadian-built SCR-588 thus Canadian CHL/GCI equip; (2) Ltr, CSigO to
Dir of SCRL, 20 Jun 42, sub: Proc of SCR-588.
began as a CHL. The first nine sets were SigC 413.44 SCR-588 No. 1 (RB-1388).
117
For ground radar developments in the second
115
Memo for File, J. J. Slattery, 26 Mar 42, sub: half of 1942, see below, Chapter IX; for their
Visit to Research Enterprises Ltd., Leaside, To- employment in the North African campaign, see
ronto. SigC 413.44 SCR-588 No. 1 (RB-1388). below, pp. 374ff.
CHAPTER IV
rived in Iceland to provide a local radio bade. Construction on Latitude 65° fell
1
net over the island. chiefly to three of the larger signal units on
Since radio was not entirely satisfactory the island: the 26th Signal Construction
in Iceland, the Army decided early in 1942 Battalion, and the 50th and 54th Signal
to stretch an independent wire network over Battalions. The 50th, whose landing in Jan-
the island. General Olmstead sent two Sig- uary preceded by six months the arrival of
nal Corps officers to make a survey. Their the 54th and the 26th, at once started upon
recommendations developed into a project its first task amid the rigors of the frigid
which the Chief of Staff approved in May wind-ridden arctic winter, laying a ten-pair
with the request that it "be accomplished as rubber cable over lava fields from the Reyk-
2
promptly as possible." The wire system was javik area to Patterson Field near Keflavik.
planned to make use of commercial carrier Among the first Signal Corps units to ar-
equipment, something new to Signal Corps rive in Northern Ireland, the next great
construction units. It was so new in fact that steppingstone toward the enemy in Europe,
Signal Corps men lacked experience in its was the 63d Signal Battalion. It sailed in
use, and therefore they gave the job of en- January, to be followed in February by the
gineering the proposed layout to the Long 203d Signal Depot Company. A group
Lines Division of the American Telephone from the 161st Signal Photographic Com-
and Telegraph Company and the Bell Lab- pany, Lt. Robert M. Lande and six men,
oratories. It would not be spiral-four and arrived at Belfast, Northern Ireland, on 19
military C carrier, which were not yet in January 1942. Col. Floyd T. Gillespie and
production, but commercial H and C car- S. Sgt. Joel M. Hirsh of the 63d Signal Bat-
rier, which Western Electric would fabri- talion initiated signal services for the United
cate. States Army forces in Northern Ireland at
"Latitude 65°," as this project became Belfast on 28 January, a few days after the
known, called for 1,000 miles of four-wire first large body of troops landed. It was
pole line extending through the northern nearly a month later before a depot of
and eastern sectors of Iceland. The four American communication equipment took
open wires would provide enough service form at Carrickfergus under the 203d Sig-
in some areas; in others, where more circuits nal Depot Company. At first, therefore, the
might be needed, the same wires would pro- Signal Corps men of this task force used
vide multiple circuits under H and C carrier Irish facilities, and only gradually substi-
operation. In the more populated southwest tuted their own. They set up a radio station
area, the planners sought to install about 2
(1) Capt Frederick Reinstein, Signal Corps
350 miles of lead tape cable carrying from Fixed Communications in the European and Africa-
ten to fifty-one wire pairs, the cable to be Middle Eastern Theaters (1945), SigC historical
monograph E-7, pp. 9-10. SigC Hist Sec File. (2)
buried except in places where lava rock for- Novick, Story of Signal Communications in Iceland,
pp. 30-36.
1
(1) Ltr, Sig Officer Iceland Base Comd to After the 50th Signal Battalion, the next signal
CSigO, 1 Apr 42, sub: SigC Quarterly Rpt. SigC units to arrive in Iceland during the first half of
SPSTP 7 Gen Rpts. (2) 1st Lt Charles R. Novick, 1942 were the 5th Signal Company and the 121st
A Story of Signal Communications in Iceland Signal Radio Intelligence Company, both landing
(1944), SigC historical monograph E-4a, pp. 7-12. in May. Unit Hist cards, AGO Organization and
SigC Hist Sec File. (3) Terrett, The Emergency, Directory. For further details on Signal Corps activ-
p. 280. ity in Iceland, see below, pp. 305-06.
THE FIRST MONTHS OF THE WAR OVERSEAS 105
SIGNAL LINE CREW CHECKING CABLE in Iceland. The men are from the 50th
Signal Battalion.
to communicate first with Iceland and then Until the headquarters for the United
with other points. On 3 March ten officers States Army Forces in the British Isles was
and 58 enlisted men of the 827th Signal organized, the American military and naval
Service Company reached London to set personnel comprising the special observers'
up facilities for the new preinvasion head- groups had occupied joint headquarters at
quarters there.3 20 Grosvenor Square. At first they had de-
pended upon British communication facili-
3
(1) ETO Hist Div, Administrative and Logis- ties and those of the American Embassy.
tical History of the European Theater of Opera-
tions, Pt. I [Henry G. Elliott] The Predecessor But when the 827th Signal Service Com-
Commands: SPOBS and USAFBI, pp. 218-21. pany arrived, the men soon established a
OCMH. (2) Interv, SigC Hist Sec with Col Gilles-
pie (formerly Sig Officer Advance Staff Group signal center at 20 Grosvenor Square, with
NIBC), 11 Aug 43. (3) U.S. Forces ETO, Sig Sec, the message center and teleprinter room lo-
History of the Signal Corps in ETO, pp. 8-12, 22. cated in flats 116 and 117 and the code
314.7, Mil Histories, Vol. 2 (C-2496, Kansas City
Rcds Center). (4) Brig Gen Francis H. Lanahan, room in a vault in the basement. Because
Jr., "Build-up for Battle," Signals, I:1 (Septem- neither time nor shipping space permitted
ber-October, 1946), 17-21.
On 9 March when the Signal Center took over the transport of U.S. Army equipment
traffic for Hq USAFBI, traffic averaged only 1,000 across the Atlantic, the 827th called on the
words a day. Reinstein, Signal Corps Fixed Com-
munications in the European and Africa-Middle
British to provide the necessary equipment
Eastern Theaters, p. 24. and office supplies. But by this time such
106 THE SIGNAL CORPS
materials were very scarce in Britain, and to land, New York, and to the New York Port
get the equipment needed the British Gen- of Embarkation went into operation. By
eral Post Office stripped some of its own the end of May, the Signal Corps had in-
installations and drew on stores of outmoded stalled four additional teletypewriters, pro-
equipment and components. Working with viding direct circuits to the Air Ministry,
an odd assortment of apparatus, some of it to U.S. Army Headquarters in Northern
venerable enough to invite the interest of Ireland, and to the United States Bomber
4
museums, the 827th managed within a few Command at High Wycombe.
weeks of its arrival to have the Signal Center The northern route to Iceland and Eng-
set up, and was handling a rapidly increas- land might on any day be blocked, if not
ing volume of traffic. by submarine, then by German invasion of
By May the rate of increase in traffic and those island bastions. The southern areas
of expansion of the communications system guarding and flanking the Caribbean and
was feverish: new officers were pouring into Panama were vital also. To assure access to
London, sometimes as many as three or four Africa and the Middle East, the eastward
hundred landing in a single day; new head- bulge of Brazil became strategically im-
quarters were springing up; new circuits portant. Signal Corps men had already
had to be installed at the rate of at least one been dispersed rather thinly along this
a week. During this period of violent activity route, serving especially the Army Air
the officers at the Signal Center were obliged Forces, which was engaged in ferrying air-
to perform the time-consuming labor of craft and transporting crews and supplies
paraphrasing all messages received in code. along a string of hastily established air
They were submerged in shipping manifests, bases. The 860th Signal Service Company,
a particularly troublesome kind of message Aviation, went to Panama in April; the
to decode. In May alone there were upward 73d Signal Company to Puerto Rico in
of 250 of these manifests, running as high March. Other Signal Corps units, particu-
as 5,000 items each, and the daily need of larly aircraft warning and aviation types,
finding new ways of saying such things as
had long preceded them.5 The 22d Signal
"In the fourth deck we have guns and auto-
Service Company had landed in Trinidad
mobiles" taxed the highest powers of inven-
tion. Not until fall was the Signal Center in mid-1941. Later in 1942 others came
relieved of the paraphrasing assignment. there and also to Ascension Island lying in
New American equipment was on its mid-ocean en route to Africa.
way, in particular a powerful Press Wire- 4
(1) Reinstein, Signal Corps Fixed Communica-
less 40-kilowatt multichannel radio trans- tions in the European and Africa-Middle Eastern
mitter with which Signal Corps operators Theaters, pp. 17-18. (2) Pauline M. Oakes, The
Army Command and Administrative Communica-
could call halfway around the world, now tions System, Pt. II, Signal Corps Domestic Com-
that they were free from the 10-kilowatt munications Network as Extended to Overseas
limitation formerly imposed by the Navy. Terminals FY 1941-15 August 1945, SigC his-
torical monograph E-5B, p. 89. SigC Hist Sec File.
In mid-July this direct ACAN radio link Signal Corps preparations in England for the last
to WAR became established. Meanwhile, half of 1942 are discussed further, below, pp. 312ff.
3
(1) See Terrett, The Emergency, pp. 282-83.
on 17 April, a Western Union channel to (2) See also Unit Hist cards for these Signal Corps
the Second Corps Area at Governors Is- units. AGO Orgn and Directory.
THE FIRST MONTHS OF THE WAR OVERSEAS 107
During 1942 men arrived in increasing mountainous areas there remained gaps in
numbers. Aircraft warning companies be- radar coverage which the long waves of the
came battalions; signal platoons, air base, early types could not fill. By May techni-
became signal companies. The 22d Signal cians, spare parts, and maintenance stores
Service Company on Trinidad doubled its were arriving, all badly needed.8
size within the year. Special units appeared, The mushrooming of aircraft warning in-
such as the 120th Signal Radio Intelligence stallations and of airfields throughout the
Company coming in April and dividing Caribbean area was demanding and getting
itself between Panama and Trinidad in extensive wire nets supplemented by radio.
order to intercept clandestine Axis radio Pole lines crisscrossed Panama; in Puerto
transmissions.6 Rico a cable went in between San Juan and
By now radars such as SCR-270, 271, Borinquen Field; in Jamaica, a cable pro-
and 588 together with skilled radar men vided comunications between Kingston and
came increasingly to the Caribbean. So did Fort Simonds. By September 1942 the tele-
radar critics, in the persons of high-ranking type system alone in Panama would em-
officers and prominent civilians, notably brace 22 wire nets and 96 machines, pro-
Watson-Watt and Secretary Stimson. The viding tactical, administrative, and weather
Secretary of War feared more for Panama nets. Tactical radio facilities appeared all
than for Hawaii. Inspecting the Canal's de- over the Caribbean, too. By the end of
fenses in March 1942, he was told that the March 1942 the Sixth Air Force was served
radar and intercept facilities there could by 20 radio nets.9
not yet cope with aircraft once they had More radio than wire went to all the is-
been launched from their carriers.7 Before lands, including the big installations for
the end of April four additional radars went Puerto Rico and Trinidad. At Trinidad mil-
into operation in Panama, and more were itary communications had been chronically
readied. In the second week of April two confused and the despair of more than one
new SCR-588's began operation, one at Signal Corps report. One root of trouble
Fort Sherman and one near Rio Hato, Pan- was a fuzzy delineation of responsibility
ama, both ahead of schedule. By April, too, between the Signal Corps and the Engineer
radar protection along the south or Pacific Corps for installing wire systems. A reassign-
approaches to the Canal extended for 510 ment of functions in April was expected to
10
miles. Along the north or Caribbean side, mend matters. Earlier in the year, General
an area 450 miles from east to west and 150 Andrews of the Caribbean Defense Com-
miles deep was now covered. But over 8
Baker, Comunications and Radar in the Area
of the Caribbean Defense Command 1940-1948,
6
Maj John H. Baker, Communications and Radar pp. 142-46.
9
in the Area of the Caribbean Defense Command, (1) Ibid., pp. 97-109. (2) Memo, Gen Stoner
1940-1948 (1948), pp. 83-86. for Exec Control Br, 4 Jun 42, sub: Prog rpt 28
The parent of all aircraft warning units, the May-3 Jun 42, Rpt 39, Item Ib2. SigC (AC) 319.1
original Signal Aircraft Warning Company, Pana- Weekly Prog Rpt, Army Com Br, Dec 41-Jul 42.
10
ma, had become the 558th Signal Aircraft Warning (1) Ltr, CofS Caribbean Defense Comd, to Dir
Battalion on 15 January 1942. Three other aircraft of Engr Caribbean Div, 28 May 42, and reply, 11
warning companies in Panama at this date were Apr 42; record of telephone conversation between
the 687th, the 688th, and the 706th. O/C Plant Div OCSigO and Col Covell, Div Engr,
7
Stimson and Bundy, On Active Service in Peace N. Y., 24 Apr 42. SigC 676, Gen 1, 1940-42. (2)
and War, p. 407. Ltr, CG Caribbean Defense Comd, to CG Panama
108 THE SIGNAL CORPS
mand had written to General Olmstead tions in Asmara, Eritrea, and in Basra, Iraq,
commenting upon plans for radio on the were being realized. By the last week of May
island which had "evidently visualized that Press Wireless filled a Signal Corps order,
the Trinidad Base Command would be in the record time of three and a half
rather unimportant." He added, "Actually, months, for a 40-kilowatt transmitter for
it is one of the most important areas in the shipment to Asmara to become the main
whole Caribbean theater; much more so station serving the U. S. Military North
than Puerto Rico." Olmstead assured An- African Mission. At the same time trans-
drews that he was expediting a radiotele- mitters were on order for the U. S. Military
phone installation for Trinidad.11 Iranian Mission: a one-kilowatt station for
Beyond Trinidad and to the east would Basra together with four lesser transmitters,
soon develop many more Signal Corps ac- two 300-watt and two 75-watt.13
tivities, as yet hardly more than paper plans
in Washington. Ascension Island, lonely, Toward Pacific Outposts
hitherto almost uninhabited except by sea
birds, the British governor, and the Cable Everywhere throughout the Pacific area
and Wireless station, was becoming a vital communications were in demand, espe-
link along the South Atlantic air ferry cially in the Territory of Hawaii. Oahu,
route. When the advance echelon of Com- America's first combat theater of the war,
posite Task Force 8012 landed there early experienced its last enemy action on the
night of 4 March 1942, when three bombs
in the spring, it brought a communication
fell upon the outskirts of Honolulu. Inter-
detachment, one lieutenant and seven men,
ceptor airplanes failed to track the craft
of the 692d Signal Aircraft Warning Com- which dropped the bombs. Thereupon Maj.
pany. With them came the makings of a Gen. Delos G. Emmons, commander of the
communication system which would serve Hawaiian Department, demanded that the
the future military installations, the airfield, Signal Corps provide him at once with AI
and the radar stations. While the men were radars, SCR-540's. He asked for three sets
completing the information center late in in order to equip a like number of swift
May, two SCR-271's were on their way A-20 attack bombers as night fighters, able
from the Lexington Signal Depot.12 to detect and hunt down enemy planes in
14
Meanwhile, plans for large ACAN sta- darkness.
From a theater of war, Hawaii was now
Canal Dept and Others, 21 Apr 42, sub: Responsi- fast growing into a huge base of supply.
bility for Sig instls; (3) Ltr, CG Caribbean Defense
Comd to CSigO, 21 Apr 42, sub: Sig Liaison Sec Men and material were accumulating pre-
Office Div Engr, Caribbean and North Atlantic Div,
13
with 1st Ind, CSigO to Sig Liaison Officer, 4 May Memo, Stoner for Exec Control Br, 28 May 42,
42, and 2d Ind Sig Liaison Officer Caribbean Div sub: Prog rpt 21-27 May 42, Rpt 38, Items lal
to CSigO, 16 May 42. SigC 300 Gen 1, 1941 and 3. SigC (AC) 319.1 Weekly Prog Rpts, Army
(PEA). Com Br, Dec 41-Jul 42. For details on subsequent
11
Baker, Communications and Radar in the Area Signal Corps activity in the Caribbean area, in
of the Caribbean Defense Command 1940-1948, Africa, and in the Middle East, see below, pp.
pp. 106, 112. 306-12.
12 14
Memo, Brig Gen Thomas T. Handy, ACofS Msg, Emmons to CofS WDGS No. (46) 2586,
U. S. Army, for CG AAF, 4 Jul 42, sub: Radar 4 Mar 42; No. (28) 2672, 9 Mar 42. Msg Log file
equip priorities. OPD 413.68 Ascension Island. [WD General] Staff Com Center.
THE FIRST MONTHS OF THE WAR OVERSEAS 109
paratory to movements ever deeper, in ever trance of Australia into the ACAN system,
greater mass, into the far Pacific. The 9th and not a moment too soon, in view of the
Signal Service Company (later the 972d approaching break in the Philippines. Writ-
Signal Service Company) maintained and ing in the dry laconic manner of a message
operated communication facilities in Ha- center log book, Signal Corps men at WTJ,
waii. At the same time the company fur- Hawaii, were soon recording the silencing
nished radio operators going out to Christ- of the Philippine radios. "WTA, Manila [ac-
mas, Canton, and Fanning Islands, and sup- tually, Bataan], was last heard by WTJ at
plied operators for transports sailing between 0701 HWT on 4 April, 1942. A circuit was
San Francisco and Hawaii and for boats established to WVDM, Fort Mills, P. I.
plying between the islands of the Territory [that is, the Corregidor transmitter], on 3
itself. In this the company was performing April, 1942, and WVDM notified station
a service like that of the 17th Signal Serv- WTJ on 9 April that WTA was lost. Con-
ice Company in Washington, which was the tact with station WVDM was lost 1807 on
parent organization for all Army transport 5 May due to loss of Corregidor to the en-
radio communicators operating out of At- emy." 17 Supplementing Hawaii's direct link
lantic ports. Like the 17th too, the 9th Serv- to Australia utilizing a ten-kilowatt trans-
ice Company quickly outgrew its authorized mitter at WTJ, lesser circuits of three- and
strength several times, growing toward 700. one-kilowatts came into use, linking Hawaii
Organization charts did not catch up with with Christmas and Canton Islands, and so
it until late 1943, when it appropriately be- by relay with Suva in the Fijis and with
came a battalion.15 Noumea in New Caledonia, extending com-
On 10 March 1942 Signal Corps men in munications along the supply route to Aus-
Hawaii established a direct ACAN link from tralia and to the encampments preparing
station WTJ, Fort Shafter, to a Royal Aus- for the coming offensive in the Solomons
tralian Air Force (RAAF) station near Mel- and New Guinea. The Canton Island link,
bourne, which served U.S. Army headquar- to station WVHT, was established on 14
ters "down under." 16 This was the first en- May 1942, followed in July by the link to
15
(1) Dr. Donald O. Wagner, Army Command Christmas Island, WVHW, and by direct
and Administrative Network, 1941-1945: Pt I, The channels to Suva, WVHU, and to Noumea,
Pacific, SigC historical monograph E-6, pp. 10-11.
SigC Hist Sec File. (2) Mary E. Boswell, The 17th WVJN.18
Signal Service Company, A Component of the War Signal Corps groups, both large and
Department Signal Center from World War I
small, were moving out in order to extend
Through World War II (1945), SigC historical
monograph E-5a, pp. 37-46. SigC Hist Sec File. and build up communication facilities. In
16
(1) Hist of Sig Sec, appended to History of mid-February 1942 a task force landed on
Subsection G-2, HUSAFMIDPAC, United States
Army Forces, Middle Pacific and Predecessor Com- Christmas Island, about a thousand miles
mands, I, Sec. 3, Radio, p. 10. OCMH. (2) Memo, south of Hawaii. Lacking a signal officer,
Stoner for Exec Control Br, 20 Mar 42, sub: Prog
rpt 13-19 Mar 42, Rpt 28, Item 8a1. SigC (AC)
the task force commander appointed 1st Lt.
319.1 Weekly Prog Rpts, Army Prog Rpts, Army 17
Com Br, Dec 41-Jul 42. The RAAF station had Hist of Sig Sec cited n. 16( 1), p. 10. It was 6
been in radio contact with Hickam Field, Hawaii, May in the Philippines, across the date line.
18
since November 1941 for the transmission of flight (1) Ibid., p. 11. (2) Wagner, Army Command
and weather information. Wagner, Army Command and Administrative Network, 1941-1945, Pt. I,
and Administrative Network, 1941-1945, p. 23. p. 10.
110 THE SIGNAL CORPS
Robert Yakerson, an infantry communica- When the first Signal Corps men landed
tions officer. His Signal Corps force com- at Noumea, they viewed the situation, per-
prised 17 men, these being 5 wiremen, 4 haps not with alarm, but certainly not with
radio operators, 4 switchboard operators, 3 enthusiasm. The only telephone equipment
truck drivers, and the section chief. Yaker- available was all French and included some
son found that while he had enough wire switchboards, a handful of field telephones,
equipment, he had very little radio, aside steel-stranded field wire wound on cumber-
from an SCR-195 walkie-talkie, which he some wooden reels, a few rolls of rubber
used for ship-to-shore contact. It was radio tape, and several reel units similar to Signal
he needed most, but it was two months be- Corps RL-31's. Even pliers were scarce;
fore he could get his orders filled.19 only one pair was allotted to each crew of
In March 1942 Task Force 6814 arrived eight men. The day after they landed they
at its destination, the islands of New Cale- laid the first wire lines along the ground.
donia and Espiritu Santo, lying south of Within three weeks, wires had appeared
the Solomons. On Espiritu Santo, in the along every road and city street. By April,
New Hebrides, troops went ashore along after American equipment began arriving,
with the Provisional Signal Service Com- the business of wire laying became some-
pany (later the 809th Signal Service Com- what better ordered. One of the first field
pany), which operated the base administra- telephone lines which signalmen completed
tive radio station and the message center. ran between La Foa, the advance command
But the bulk of the task force established post, and Tontouta, 35 miles away over
itself on the large island of New Caledonia, rough country. EE-8 telephones powered
chiefly at its capital city, Noumea, where by 24-volt external batteries were at first
the 26th Signal Company provided com- unsuccessfully installed on the line. Teletype
munications with considerable effort, since failed, too. Rain and dampness penetrated
the facilities already existing on this French to the wire strands and short-circuiting the
possession were primitive. Headquarters on current limited the opportunity for any
kind of communications to the hours when
the 250-mile-long island were at Noumea,
the sun was high. Poles also were a problem.
at the southern tip. The main airfield was
Many of them quickly rotted. Many more
at Tontouta, 35 miles away, while a second
were snapped, sideswiped by vehicles pass-
airfield at Plaines des Gaiacs lay over 100 ing along the narrow roads. Until the poles
miles farther north. Beyond even that was a were relocated, the La Foa command post
detachment of about a battalion of Aus- relied upon its radio. Not till May 1942,
tralian commandos stationed in the ex- when heavier wire, W—50, was used to re-
treme northern end of the island.20 place the W-110-B first employed on the
19
Interv, SigC Hist Sec with Lt Yakerson (for-
circuit, did La Foa and Tontouta enjoy de-
merly Sig Officer at Christmas Island), 26 Sep 43. pendable wire communications, both tele-
20
Intervs, SigC Hist Sec with (1) 1st Lt James phone and teletype. The task of tying to-
G. Charles (formerly Bn Com Officer 754th Tank
Bn GHQ-RES in New Caledonia and Radio Offi- gether the military communication lines
cer at Espiritu Santo), 6 Oct 43; with (2) Capt over the island, including a teletype circuit
Clyde Bryce; with (3) Lt Col R. B. H. Rockwell between Tontouta and Plaines des Gaiacs
(formerly Sig Officer Task Force 6814, New
Caledonia), 9 Sep 43. airfields, kept the 26th Signal Company ex-
THE FIRST MONTHS OF THE WAR OVERSEAS 111
tremely busy with wire work. Besides, there similar to the 268. Actually, eight SCR-
were radio channels to operate, both the 268's had gone to Java about 1 February.
long ones which extended to Hawaii in one Col. Calvert H. Arnold, then the theater
direction and to Australia and New Zea- signal officer, turned them over to the Navy
land in the other, and the shorter ones of for the defense of Soerabaja. Before Java
the local net which connected with other collapsed, Ensign John D. Salisbury,
islands nearby, Espiritu Santo and Efate. USNR, supervised the installation of five of
In all this the 26th Signal Company ac- them for the Royal Australian Air Force to
quired much tropical experience which operate. The remaining three sets were in a
would serve the men well during their la- Dutch depot. A surviving Dutch signal of-
bors to come, on Guadalcanal and on ficer asserted that the Dutch completely de-
through the Solomons.21 stroyed the equipment, of which, he said
Early in 1942, when the war in the they had made "very little use." But Salis-
Southwest Pacific was at its gloomiest, Gen- bury, who also survived, could give no as-
eral MacArthur and his staff arrived in surance of their total destruction since none
Melbourne from doomed Corregidor. of the RAAF or Dutch officers who had
Headquarters officers now based their plan- been directly charged with the sets had
ning on a defense line running through Bris- escaped.23
bane west-northeast, and called for extensive As for the two SCR-271's in Australia,
communications and radar installations. As the Signal Corps men at Brisbane patched
for radars, there were none at the time in them up and sent them with operators to the
operating condition in Australia. There Samoa Islands and Tongatabu. Since some
were two SCR-271's, but they lacked re- of the parts were missing, the men impro-
ceivers as well as other parts. Several SCR- vised substitutes while the headquarters
268's had gone to Java. They evidently had made up a radar company using any troops
given little comfort to the Allies. According within reach and training them from scratch
to one report, they had been shipped without with such odds and ends of equipment as
24
instruction books, whose secret classifica- were available. Some relief for the des-
tion required special and separate han- perate equipment shortages was on its way,
dling.22 They may well have given comfort however. In early March G-4 in Washing-
to the enemy, for although the Dutch gave ton sent word that 220 ship tons of
assurance that they had destroyed the sets, spare parts and supplies for SCR-268's,
the Japanese subsequently built radars quite 270's, and 271's, as well as for aircraft and
vehicular radio sets, were being assembled
21
(1) Ibid. (2) Incl 1, Signal Corps Activities
23
in the SPA, with Ltr, Actg Sig Officer SPBC to Dir (1) OCSigO R&W Action 1, Capt A. V. Hazel-
of Plan and Opns Div OCSigO, 31 Jul 44. SigC tine to Deputy CSigO, 12 Jun 42, sub: Radio
319.1 SPBC. (3) Col Arvid B. Newhouse, Sig Res, equip on Java; (2) SigC Intel Memo 4-S Nether-
"SOPAC Signals," Signals, 11:5 (May-June, lands, 28 May 42, sub: Notes on interv with Dutch
1948), 35. (4) Walter D. Kunhart, Signal Corps signal officer recently returned from Southwest Pa-
Activities in the South Pacific Theater, December cific theater; (3) 4th Ind, CSigO to ACofS G-2,
1941-July 1944. SigC Hist Sec File, A46-160. See 8 Aug 42, on Ltr, Chief of MIS to CSigO, 30 May
below, pp. 468ff., for South Pacific communica- 42, sub: Possible compromising of SCR-268 sets
tions from late 1942 to mid-1943. on Java. SigC (EO) 413.44 Radio Sets Gen 1942-
22
Intervs, SigC Hist Sec with Frank W. Hogan, 44.
24
Shops Br Proc and Distr Div OCSigO, 1, 5 Jul 49. Intervs with Hogan, 1, 5 Jul 49.
112 THE SIGNAL CORPS
for shipment to Australia. With luck this Pacific. Yet its transmitter was only one-
equipment should arrive in April, and with kilowatt. An ACAN chart dated in May
luck it did. Shortly before the Battle of the 1942 showed channels in operation from
Coral Sea, Signal Corps men installed two WTJJ to Hawaii, by way of Noumea
SCR-270's near Brisbane, and subsequently (WVJN) in New Caledonia, to Darwin
an SCR-516 and some 268's at Port (WVJK), to Townsville (WVJL), and to
Moresby in New Guinea. Toward early Sydney (WVJM). 2 7
summer they got also an SCR-270 to install Transmission over all the channels was
north of Townsville and, a little later, one accomplished by hand-keying. There was
for Darwin.25 nothing like what was wanted and neces-
As for communications, General MacAr- sary in the way of equipment. In some in-
thur's headquarters in Melbourne had at stances, supplies were exhausted tempora-
first only one link to Hawaii and it was an rily; in others, the equipment requested had
Australian transmitter located in an RAAF not yet been produced. For example, Col-
radio station. In mid-March this station be- onel Arnold, the theater signal officer early
gan working on an hourly schedule with in 1942, asked for ultrahigh-frequency key-
Fort Shafter.26 Meanwhile a Signal Corps ing equipment. He wanted two transmitters
lieutenant, Roger E. Dumas, with a team and two receivers with antennas and instal-
of 19 men, only one of whom had ever had lation material. Word came back from
any experience with fixed installations, was Washington that specifications had not yet
setting up an ACAN system for U. S. Army been completed and that the units would
headquarters in Australia. Dumas and his not go into production for nearly a year. An
men had arrived in February along with additional request for three one-kilowatt ra-
the 52d Signal Battalion with a good deal dio stations for high-speed operation, also
less than all the equipment needed to carry for one one-kilowatt manually operated sta-
out their mission. With Australian sympathy tion, together with the radio teams needed
and assistance, together with "whatever to install and then operate the stations,
could be scraped up ... and a consider- brought the reply that no high-speed
able amount of improvisation," they man- (Boehme) equipment would be available
aged to establish a radio network. Its control before June.28
station, WTJJ, Melbourne, presently began Thus Colonel Arnold early in 1942 found
bringing McArthur's headquarters into bet- himself trying to make bricks pretty much
ter communication with the various base without straw. Not only was he desperately
sections and numerous island posts in the short of equipment to start with, but many
of his men were taken from his Signal Corps
25
(1) Ibid. (2) Ltr, CofS to CG USAFIA, 6 Feb 27
42, sub: U. S. Army Forces in Australia, with list (1) Interv, SigC Hist Sec with Maj Robert E.
of sig equip; (3) Memo, ACofS WDGS G-4 for Dumas, 24 Nov 44. (2) Wagner, Army Command
CSigO, 18 Feb 42, sub: Equip for Force 4502, and and Administrative Network, Pt. I, pp. 22-24, and
Ltr, ACofS WDGS G-4 to TAG, 23 Feb 42, sub: chart, Army Administrative Radio System, South
Equip for SCR-271 sets for X. G-4/33861 Jan 42 Pacific, 9 May 42. The 52d Signal Battalion, part
Sec. II. TC File 33861. of the 176th Signal Company, Repair, and several
26
Memo, Stoner for Exec Control Br, 20 Mar 42, radio teams and detachments had left San Francisco
sub: Prog rpt 13-19 Mar 42, Rpt 28, Item Sal. in January aboard the Mariposa and the President
SigC (AC) 319.1 Weekly Prog Rpt, Army Com Coolidge.
28
Br, Dec 41-Jul 42. T. C. File 33861, passim.
THE FIRST MONTHS OF THE WAR OVERSEAS 113
units also. Directly after their arrival in group of self-contained units, each capable
Melbourne in February, Arnold himself of functioning independently in a combat
29
had embarked a considerable portion of his zone.
best signal specialists, together with such Meanwhile at Melbourne, Army's radio,
tactical equipment as they had, intending WTJJ, during its first weeks of operation
them to go to Java. But almost at once into early May handled the last flow of mes-
Java fell to the enemy and the ships carry- sages from the besieged Philippines. Re-
ing the men were diverted to India. Not layed through Darwin to Melbourne and
only had Arnold lost these men, but he tem- then retransmitted by way of Honolulu to
porarily lost others of the 52d as well who the War Department, this load ran to about
were detailed here and there in Melbourne 30,000 groups a day, both ways, and was
as guards, dock workers, and military po- carried on one duplex manual circuit. Total
lice. Signal specialists found themselves traffic in Melbourne during April and May
serving as janitors and chauffeurs. A few averaged up to 40,000 groups daily. Yet
actually did signal work, operating the there were no serious transmission difficul-
headquarters message center and switch- ties during these early months. The only
board. By mid-April the 52d Signal Battal- exception was delay of messages calling for
ion was becoming a discouraged and dis- air support during the Battle of the Coral
heartened outfit, chafing under the uncer- Sea on 7 May; this was fought before suffi-
tainty of its mission, the continued dock cient facilities had been built up to accom-
details and fatigue duty, the cold wet modate a large volume of traffic.30
weather, and the conviction that they were
stepchildren. The morning report of each China-Burma-India Vicissitudes
company showed that most of the men were
either on detached service or on special It was in February 1942 that Colonel
duty. At first, the only infractions were Arnold dispatched to Java, he thought,
minor, but as the weeks went by, courts- some of his Signal Corps men from the 52d
martial became frequent. There being no Signal Battalion, together with a number of
assigned battalion commander, a captain his Signal Corps teams, which had recently
who was the senior officer present assumed arrived in Australia. These officers and men
command until 19 April, when Lt. Col. never reached Java. At Fremantle, in West-
John C. Green was assigned to command. ern Australia, they found themselves sud-
Battalion strength was down to 15 officers denly transferred to vessels which sailed on
and 399 enlisted men by 31 May. Still an- and on, westward, into the Indian Ocean.
other month passed before the 52d Signal In mid-March the ships docked at Karachi,
Battalion got replacements for the officers
29
(1) History of the 52d Signal Battalion, 1 Feb-
and men sent to India in February. After ruary 1942-24 December 1944, pp. 1-6. Opns Rpt
that would come the return of men on de- SGBN-52-0.1 (20063). (2) Interv, SigC Hist Sec
tached duty, and a 1,200-mile move to a with Brig Gen Calvert H. Arnold, 1 Jul 49.
30
(1) Interv with Dumas, 24 Nov 44. (2) Wag-
new camp near Brisbane, Queensland, fol- ner, Army Command Administrative Network, Pt.
lowed by a period of intensive training of I, p. 24. The account of Signal Corps activities in
Australia and in the Southwest Pacific theater gen-
teams for all phases of signal communica- erally is continued for the second half of 1942 in
tions, designed to make the battalion a pp. 298ff., below.
264-211 O - 78 - 9
114 THE SIGNAL CORPS
a dusty port in the northwestern desert tered the ACAN system, although uncer-
lands of India. On the very day of landing, tainly because the direct circuit passed
seven of the Signal Corps men set up a mes- through the electrically unfavorable polar
sage center while Teams C, J, and part of areas. This circumstance continued to ham-
E went to work erecting a radio station. per the signal even after the men at Karachi
Team H hastened to New Delhi in central subsequently installed the ten-kilowatt trans-
India in order to construct a station which mitter and obtained a large 75 KVA gen-
would control the future radio network of erator from the Standard Oil Company of
the China-Burma-India theater.31 Arabia. In the following month Karachi
Back at Karachi the Signal Corps crews established its next contact, uncertain as the
first installed a 300-watt BC-447 transmit- WAR circuit; it reached to Chungking,
mitter in an airplane crate, turned on the where a Navy transmitter, taken from a
power, and made contact with New Delhi Yangtze River boat, replied with a weak
on 7 April. What was most wanted was a 300-watt output.34
direct contact with home, with station During April and May 1942, other Sig-
WAR in Washington. The men had a pow- nal Corps teams moved from Karachi to
erful 10-kilowatt transmitter, but no gen- varied posts in India. The movement be-
erator for it. The one intended for it had came especially rapid after the 835th Sig-
been left far behind, on the other side of the nal Service Company arrived on 16 May,
globe, in the States, and local power sup- when the Brazil docked at Karachi two
plies were uncertain at best. But the Signal months after sailing from Charleston. Men
Corps men did have a smaller one-kilowatt
of the 835th, amazed to find that American
transmitter BC-339, together with a suit-
troops had preceded them, commiserated
able generator. Erecting a rhombic an-
32 with their fellow signalmen as they moved
tenna, they hoped to beam a sufficiently
strong signal across the North Pole to reach to their quarters in the heat and dirt of clay
down to WAR. On 22 April they suc- barracks at New Malir, in the desert about
ceeded.33 Station WVNA, Karachi, thus en- seventeen miles out of Karachi.35 Tasks of
31
enormous proportions awaited them where
(1) Sgts John and Ward Hawkins, History of
the 835th Signal Service Battalion 1942-1946, there had been relatively little radio before
pp. 2-3, 12. SigC Hist Sec File, A47-200, Drawer and where such wire nets and equipment as
15. (2) Interv with Arnold, 1 Jul 49. already existed were old and unsteady.
32
A rhombic antenna sends out a maximum
strength signal in a predetermined direction. The Communication nets had to be set up and
antenna wire is strung in the shape of a rhombus, maintained over a gigantic area from China
or diamond, poles supporting it at the four corners. across India and beyond. Teams and de-
33
Both the Hawkins history and the SOS CBI
history give 22 April, 1307 GCT, as the date and tachments would soon penetrate to all parts
time of the first two-way contact with WAR. (1) of the China-Burma-India theater: to Cal-
Hawkins, History of the 835th Signal Service Bat- cutta, Ramgarh, Chabua, and Ledo in
talion, p. 3. (2) History of the Services of Supply,
China-Burma-India, App. 25, Sig Sec, Pt. IV, p. 2.
India; to Kunming in China, and, in the
OCMH. Listeners in WAR first heard Karachi's opposite direction, to Asmara in Eritrea,
faint calls on 18.3 megacycles the day before, but
34
they had been unable to put a reply through on Hawkins, History of the 835th Signal Service
17.56 megacycles. Memo, Stoner for Exec Control Battalion, p. 3.
35
Br, 23 Apr 42, sub: Prog rpt 17-22 Apr 42, Rpt Interv, SigC Hist Sec with T/4 John J. Wild-
33, Item 5c. SigC (AC) 319.1 Weekly Prog Rpts, mann (formerly of the 835th Sig Sv Co serving in
Army Com Br, Dec 41-Jul 42. the CBI theater), 24 Nov 44.
THE FIRST MONTHS OF THE WAR OVERSEAS 115
Africa. Team Seven left Karachi late in and got the less desirable but the more im-
June for Asmara, in order to make the ini- portant post, which was in Assam Province,
tial installation there of a very important lying on India's eastern border, next to
relay station. Henceforth the unreliable Burma, China, and Tibet. Before the team
direct circuit between Karachi and Wash- could complete the communication installa-
ington over the Pole could be bypassed, tions desired there, it was ordered to move
relayed by way of Asmara over the equa- into Burma itself to provide communica-
torial regions of the earth, where transmis- tions for Lt. Gen. Joseph W. Stilwell, then
sions can be radiated dependably at all at Lashio, the Burmese terminus of the
times.36 Burma Road, which the Japanese were at-
Before the 835th Signal Service Com- tacking. Team I arrived at a crucial mo-
pany arrived in mid-May, the first Signal ment in April just when the British and
Corps teams on the Indian scene were al- Chinese forces were crumbling. First the
ready moving to what must have seemed British, then the Chinese, abandoned
the very ends of the earth. In April, Team Lashio, and retreated westward toward In-
L, 20 men, went to Asansol, a little to the dia as the Japanese advanced. The Signal
northwest of Calcutta, to supply communi- Corps men stayed on, except for a detail of
cations for two Royal Air Force squadrons seven men who were to report to Stilwell's
which were operating against the Japanese headquarters at Maymyo near Mandalay.
in Burma. Team L at once put an SCR- Even as the detail forced its truck through
188 into operation in order to maintain the retreating hordes that flooded the high-
circuits while they began installing a 300- way, it found that Maymyo too was already
watt fixed transmitter. Three weeks later, being abandoned. But the men pushed on
before the job was done, they received or- to Mandalay and then turned northwards,
ders to another Royal Air Force base, at under Japanese bombing, to Schwebo,
Allahabad, halfway to New Delhi. Taking where General Stilwell halted briefly. Dur-
their 188 with them, they put it back on the ing their four days there, the seven men set
air within a few hours of their arrival. As up and operated a message center. On each
the Allahabad base became headquarters day came air raids, none of which quite hit
for the 9th Bombardment Group, demands the center itself. As the Burma campaign
mounted upon the team, the only communi- ended, Stilwell called for air transport and
cation men in the area. After they had set it was the detail from Team I that sent the
up the 300-watt transmitter, they were call. One plane flew in. Part of the detail
asked for wire lines. Although inexperi- boarded it; the rest remained on the ground
enced in telephone and wire work gener- and escaped on foot with Stilwell. At first
ally, they learned about it, putting in and their radio truck accompanied the Stilwell
operating 30 miles of wire, 40 telephones, party; later it had to be abandoned in the
and 2 switchboards.37 jungle along with the rest of the party's
motor vehicles.38
Team I tossed a coin with Team J to
determine which would win a comfortable 38
(1) Jack Belden, Retreat with Stilwell (New
assignment to Bangalore. Team I lost— York: Alfred A. Knopf, Inc., 1943), pp. 267, 275,
277, 303. (2) Charles F. Romanus and Riley Sun-
36
Hawkins, History of the 835th Signal Service derland, Stilwell's Mission to China, UNITED
Battalion, pp. 13-14. STATES ARMY IN WORLD WAR II (Washing-
37
Ibid., pp. 15-16. ton, 1953), pp. 137-38.
116 THE SIGNAL CORPS
The remainder of Team I had stayed at from its former location at Fort Santiago
Lashio, which the Japanese now cut off and Fort William McKinley. It did not
from the west as they pushed to Mandalay. last long in its first installation in an ex-
These isolated and forgotten Signal Corps posed location on Corregidor; indeed, it was
men never received orders to retreat. But bombed out rather quickly. The men then
obviously they could not stay where they moved the station underground to Malinta
were. They now had only one escape route Tunnel, Lateral Twelve. Two hundred feet
left, the Burma Road itself leading into of rock separated the equipment from the
China. They loaded their equipment, includ- transmitting and receiving antennas atop
ing a 300-watt transmitter, into broken- Malinta Hill. Improvised antennas they
down trucks. Two sergeants in one of the were, which were repeatedly being knocked
trucks won out against the heated misgiv- down by enemy fire during the final bitter
ings of a colonel who wanted to throw off weeks of siege.40 Radio transmitters collected
the signal supplies and load some relatively from amateurs and commercial firms, to-
useless equipment instead. After bad mo- gether with other equipment which had been
ments at first when they were pursued by brought over when Fort Santiago was aban-
the enemy, they reached Kunming early in doned, kept the Corregidor installation on
May 1942. Their transmitter was the first the air. Circuits to Brig. Gen. William F.
large Signal Corps radio in that area of Sharp's headquarters on Mindanao, to
China. A month later the men received Bandoeng, Darwin, and Honolulu had been
orders to move on to Chungking. The trans- quickly established. Early in February a
mitter and some indispensable spare parts Signal Corps officer went from Corregidor
had been repeatedly saved by the stubborn- to Bataan to set up a high-speed radio sta-
ness of their keepers. The equipment was tion for the transmission of allotment, in-
literally worth its weight in gold in that surance, promotion, and casualty messages
land where light sockets cost $12 in gold to Honolulu for relay to the United States.
and where many electronic items were un- In two weeks he finished the installation.41
available at any price. This BC-447-A Signal communication on Corregidor
thereafter went to work on the circuit be- had the task of keeping General MacArthur,
tween Chungking and New Delhi, and for
the commander of the United States Army
over a year it transmitted allied traffic in
the area, messages relating both to the 40
(1) Interv, SigC Hist Sec with Sgt Messer (for-
Burma Road and to the air transport pass- merly radio operator at Corregidor), 17 May 44.
ing over the Hump.39 (2) Report of Operations of USAFFE and
USFIP in the Philippine Islands, 1941-1942, An-
nex XVII: Col Theodore T. Teague, Report of
Last Weeks in the Philippines Operations, Signal Corps, United States Army, 8
December 1941-6 May 1942. 26447 98-USF 1-0.3,
In the spring of 1942, Army's last radio DRB AGO. Copy in OCMH. The basic source for
this entire account of the last weeks in the Philip-
station in the Philippines operated on iso- pines is the above document, supplemented by MS
lated Corregidor. Earlier, upon the evacu- comment by Colonel Teague contained in a series
ation of Manila, it had moved to Corregidor of letters to Dulany Terrett over the period 24
September 1949 to 14 April 1950. SigC Hist Sec
39
Hawkins, History of the 835th Signal Service File.
41
Battalion, pp. 7-8. The account of Signal Corps Wagner, Army Command and Administrative
men in CBI is continued below, pp. 303ff. Network, pp. 45-46.
THE FIRST MONTHS OF THE WAR OVERSEAS 117
Forces in the Far East (USAFFE), in touch the bay from Manila stood in a confusion
both with the outside and with his own tac- of types, of manufacture, of size, of age, of
tical units. Except for the Visayan-Minda- condition, of design. Grime and salt spray
nao Force and scattered resistance groups had coated it. A radio electrician, William
elsewhere, these units were concentrated in Gibson, a civilian employee of RCA who
the Bataan peninsula. Aside from radio, had volunteered to join the exodus, offered
their only connection with Corregidor was to take charge of it, and Colonel Teague,
a telephone circuit. Between Corregidor Is- left without anyone better qualified, thank-
land and Bataan lay an old submarine tele- fully accepted the offer. Gibson did his best
phone cable with but four good circuits to put it in working order, causing sets of
remaining. Lest it fail, the USAFFE signal equipment to cohabit which had never
officer, Brig. Gen. Spencer B. Akin, ordered been introduced.
a new one laid. The Coast Artillery Corps This equipment was one source. For an-
owned a 26-quad cable, and, although some other, there were the fixed transmitters that
reels had been hit by enemy bomb frag- had been used to work Honolulu. Colonel
ments, enough of it was still undamaged for Teague, looking at them for the first time,
the job. Part of the telephone circuit fol- found them to be old, and so large and
lowed the bay cable and the rest a pole line heavy that they could not be removed from
which slashed conspicuously through clear- the buildings. Fortunately, each had a
ings on the forested peninsula. Not only be- 1,500-watt exciter, and these he caused to
cause of this weak link but also because of be removed from the parent sets and trans-
an acute shortage of trained men, it seemed ported into the Malinta Tunnel. There they
best that the island become the signals dis- were overhauled, and one of them became a
tributing point. Interisland traffic between transmitter to work Australia. The other
USAFFE and its subordinate organizations, was held in reserve. Two excellent and
as well as the overseas station on Bataan, comparatively new low-powered transmit-
was controlled by the Corregidor station. ters had come from the plant of the Philip-
Now entunneled, with secondary com- pine Telephone Company. The men of the
munications to the troops, the headquarters installing and maintaining crews were for
on Corregidor lost direct contact with the most part young and active (pain and
Hawaii and beyond and had to depend starvation lay yet ahead of them). They
upon the Corregidor naval radio station were able to overhaul the good transmitters
for it. In a room at the rear of Lateral and put them to use for broadcasting south-
Twelve, three chief petty officers, succeed- ward to the Visayan-Mindanao Force.
ing each other in shifts, kept a wire tele- They brought the USAFFE Reserve sta-
graph circuit open to the Navy station on tion into the tactical net. They set up a
Corregidor, and the signal intelligence and receiving antenna by rigging a small aerial
radio operating sections moved in with on Malinta Hill and leading it through a
them. ventilator shaft into the operating room in
The signal men on Corregidor had cast Lateral Twelve. Within five days after they
about during January to see what was on had arrived on Corregidor, they had used
hand and what communications they could the other transmitter to set up a "Voice of
establish with it. The equipment sent across Freedom" broadcasting station, placing the
118 THE SIGNAL CORPS
aerial outside the hospital lateral of Malinta tous ground. The Engineers hauled into po-
Tunnel, the transmitter just inside, and the sition a large gas engine-electric generator
microphone in the quietest place they could unit, bolted upon skids, to provide power
find: the rear of Ward 11. for the transmitter should the post power-
It was when they received orders to set house be bombed out of operation. They
up a radio channel to Darwin that they covered it with concealing tarpaulins, di-
showed the greatest energy and ingenuity of rected the exhaust horizontally, and sand-
all. Considering the equipment available bagged the walls of its partial shelter.
and the distance to be covered, they imme- Meanwhile, the "Australian" transmitter
diately saw that a large rhombic antenna improved slowly, although it was still an
was needed. A rhombic antenna is "direc- unsatisfactory channel and, in the narrow
tional" and provides the strongest signal darkness of Lateral One, was insufficiently
with the least amount of power, and, in protected even by a big "Danger—High
order to cross the thousands of miles to Voltage" sign. Outside, at the new antenna,
northern Australia, a properly oriented the men were rigging the wires. Weighting
rhombic offered the best chance of success. the end of the wire, they would heave it
Abetted by the Engineers, they determined through branches and haul it down with a
the northern and western angles of the hand line. Often, it tangled and they had to
rhombus high along a ridge, the eastern climb the tree to free it. At last the rhombic
angle in a ravine and the southern end also was ready, the transmission lines were con-
low, along the edge of the water. Some of nected, and on the twenty-first of January
the men went about seeking the four biggest the rhombic aerial tried Darwin. The result
poles on the island, while Teague with oth- was a disappointment. For all their work,
ers attempted stopgap communications with the strength of the signal was barely in-
Darwin. creased. At the other end, moreover, the
During the brief period when the Manila Australian operators were still inexperi-
RCA channel had worked Darwin, and enced, unaccustomed to worrying a weak
just before it had to be destroyed, a call sign signal along. If the rhombic were useful at
had been agreed upon. The men now per- all, it would be little better than what was
forated a tape with the sign, pasted the ends already operating. The men had whatever
of the tape together to make an endless belt satisfaction they could get from knowing
and then, affixing it to one of the machine that they had tried.
transmitters, set it to issuing the call, over Corregidor, a beleaguered fortress, never-
and over again. Feebly, the endless tape theless maintained a broadcasting station
sent out its signal. It got no response on the and missed no schedules. Teague had two
first day of its use, or on the second; but on telegraph positions working and, counting
the third Darwin reported having heard it the Australian transmitter, eight for radio.42
faintly, during the nighttime lull. What 42
The so-called patrol transmitter reached the
Teague wanted was something much naval inshore patrol off Cabcaben; the Bataan po-
stronger, which could be heard in the day. sition maintained contact with I Corps, II Corps,
and the V Interceptor Command; and the Minda-
One by one the four heavy poles for the nao transmitter sought to keep channels open to
rhombic went up on the rocky and precipi- the Visayan-Mindanao Force.
THE FIRST MONTHS OF THE WAR OVERSEAS 119
At the beginning of February the men built By the third week in March, MacArthur's
a broadcasting "studio," which was doubly small party (including the signal officer,
insulated both by Celotex and by its loca- General Akin) had successfully escaped to
tion at a point where Lateral One joined the Australia. Lt. Gen. Jonathan M. Wain-
main tunnel. Out of doors, the endless busi- wright assumed command in the Philip-
ness of maintaining the aerials went on. pines, United States Forces in the Pacific
Once during the course of the siege, an (USFIP), with Colonel Teague as his sig-
aerial which had been shot down by artillery nal officer. On Corregidor, the only alterna-
fire was restored to use when an airplane
tive to work was more work and, beyond
bombardment threw it up over some trees:
that, waiting for capture. Efforts to
it came back into service because it hap-
pened still to be connected. strengthen the communications of the
Even this limited maintenance, so con- Visayan-Mindanao Force met with frustra-
centrated as to be pinpointed on the target tion. J. E. S. Stevenot, a lieutenant colonel,
island, used up three and a half miles of who had been commissioned from his civil-
wire. Supplies were dwindling so fast that ian occupation as president of the Philippine
by the middle of February a signal requisi- Telephone Company, looked like a good
tion for a whole division could be carried in man to become the southern force signal
the pocket of one man. Only such items as officer, but General MacArthur, now estab-
primary batteries and friction tape were on lishing his headquarters in Melbourne, put
hand; there was no use in asking for any- him on the list of those to be evacuated.
thing else. For those transmitters on Bataan From Australia, Akin sent, by name, for ten
which depended upon gasoline-driven intercept radio operators. It was important
generators, there was always a delay in not to let them be captured and tortured.
answering calls, because gas rationing made Meanwhile, the hours of duty increased for
it crucial not to start up the generators until men who were already weary. Teague him-
time to send out a message. The roads on
self helped out, so that the regular operators
Corregidor along which lay a section of the
might take hurried meals or even so that
shallow-trenched submarine cable to Ba-
they might go to the latrine. In Melbourne,
taan came under enemy bombardment.
The wire maintenance officer and a crew of by this time, MacArthur's headquarters had
three cable splicers worked at repairs night two more men listed for departure from the
after night by the masked light of a lantern: island by the first means available. One of
29 hits, 57 splices. At no time until the loss them, in civilian life the plant chief of the
of Bataan, however, was either the radio Manila telephone exchange, had already
channel or the wire circuit between the been captured; the second, formerly man-
island and the peninsula interrupted. And ager of the exchange, was located and
throughout the ordeal, the Corregidor evacuated.
operators transmitted a million words a Meanwhile, the troops on Bataan steadily
month, most of it coded, much of it sent weakened. As supplies dwindled, their meals
manually, and all of it handled under what were cut again so that during the month of
military understatement calls "adverse March the men were getting barely a one-
conditions." fourth ration. To the wounded were added
120 THE SIGNAL CORPS
growing numbers of the diseased, and of months after December, and six months be-
the nervously fatigued, broken by the strain ing the period for which prewar calculations
of bombing and by the inability to strike had supposed that the Philippines could
back. Maj. Gen. George M. Parker, com- survive without reinforcements. Enemy
mander of the II Corps, estimated by 15 bombers and shore-based artillery were
March that the combat efficiency of his men steadily blowing up the aerials, and the big
was down to 20 percent. Each day it rhombic was now gone. Some of the older
lessened.43 radio sets failed, and not even improvisa-
On 9 April, Bataan surrendered and the tion could repair them, although all radio
radio station of the erstwhile Luzon Force channels still remained open. Transmitting
signed out of the USFIP net. The telegraph tubes "gassed." Finally, a week before the
and telephone circuits between Bataan and fall, everything was listed on a destruction
Corregidor closed, too, and crews cut the plan; the Engineers agreed to explode the
submarine cable, first at the point where it permanent installation of the Philippine-
emerged from the water on Bataan, then at Hawaii channel, and the signal officer esti-
the Corregidor end. They drew the cable mated that three hours would be enough to
up from the water, cut it with a hack saw, accomplish the destruction of all the rest
sealed it with molten lead at both ends, then of the communication equipment. Just at
buried the shore end to conceal it, and sank that point, a requisition was filled: a small
the seaward end as far as possible out in shipment of vacuum tubes was flown in.
the bay. In anticipation of the collapse, General
Now the certainty of capture canceled the Wainwright composed three messages: one,
hope for relief. Habit still suggested requi- labeled "Washington No. 1," to the Chief
sitions for more supplies but discipline dic- of Staff in Washington, one to General
tated the destruction of those on hand. On MacArthur in Melbourne, and one to the
22 April Colonel Teague asked the signal commanding general of the Visayan-Min-
officer in the Southwest Pacific for items to danao Force at Del Monte, Mindanao.
be shipped to Corregidor in case the island These penciled messages he handed to his
held out; and on the same day, the message signal officer, Colonel Teague, who in turn
center started burning its files. On the first prepared two others, both to the Chief Sig-
of May, the signal office burned more files, nal Officer: a "Washington No. 2," which
at the same time that everyone was wearily would report that the cryptographic ma-
planning the possibility of resisting for an- chines had been demolished, and a "Wash-
other month—one more month being six ington No. 3," which would inform him
43
(1) Report of Operations of South Luzon Force,
of the destruction of the cipher strips. All
Bataan Defense Force, and II Philippine Corps in five of these Teague taped to his chest to
the Defense of South Luzon and Bataan. (2) Mor-
ton, The Fall of the Philippines, pp. 367-68; Chs.
hold in readiness, and to guard against their
XXI-XXVI, passim. transmission by accident. During the in-
THE FIRST MONTHS OF THE WAR OVERSEAS 121
terim, the men continued the transmitting sponded, and "Washington No. 1" went
of insurance and allotment authorizations. on its way. "Washington No. 2" followed
Made famous by newspaper dispatches it at 1110. To make sure, both messages
which described it, this pathetic duty almost were also beamed at Del Monte; and to
incredibly taxed all of the available chan- make trebly sure, commissioned couriers
nels. The longest message extended for more rushed them to the naval radio station, for
than 20,000 words. One of the men who be- a third transmittal by equipment which was
already being systematically wrecked. Suc-
gan to send it—manually—worked at it
steadily for eight hours, went off duty, re-
cessively, the messages to Melbourne and
turned 16 hours later, and found it still
Del Monte sped out, blind, at ten-minute
intervals. Working one of the positions prior
being transmitted; only a few priority mes-
to 1037 that morning a soldier named Irv-
sages had interrupted the sending mean-
ing Strobing had been filling in the time
while. All of this traffic was moved doggedly
with poignant if unauthorized farewells
out, and none of it was ever garbled. 44
to his family.
On 6 May 1942, Corregidor fell. Teague
44
did not get the three hours which he had Sergeant Messer, one of the Signal Corps sur-
vivors of Corregidor, recalling the events of that
looked for. He got only one hour and 23 day in an interview on 17 May 1944, stated: "I
minutes. But it was enough. At 1037 Wain- would like to mention the Signal Corps operator
wright's chief of staff ordered Teague to who sent the last message from Corregidor. I am
not sure of his name now, but I believe it was
send the final messages. From his chest Struble. He was an old operator from WTA [age
Teague uptaped the envelope containing the 22!] and went under the name of 'Junior.' He was
coded messages. Shuttling back and forth quiet, reserved, courageous at all times, and took
between headquarters and the message his operating seriously. In rank he held the exalted
position of Private First Class, specialist second
center, telephoning, pausing for instruc- class. He held the job of trick chief as well as
tions, listening to other instructions, the operator. He worked the Darwin-WTA circuit
men worked rapidly and efficiently. One mostly and handled the traffic under the very worst
conditions imaginable. Interference was always
by one, the final messages went to their heavy and jamming by the Japs became as much a
destinations. At 1105, just as M. Sgt. part of operating as the background noise in the
Richard K. Sakakida began broadcasting receiver. The things he did and the things he said
on that last day were not the remarks of some
in English and Japanese the first of three foolish wit, but were the true reflections of a
hourly announcements of the capitulation, battle-weary Signal Corps radio operator who had
"Washington No. 1," Wainwright's mes- seen his world turned upside down, his friends
killed and who himself was destined to step outside
sage to General Marshall, was brought out.
the tunnel and face the unknown." (1) Interv,
It would go via Fort Shafter, the relay sta- SigC Hist Sec with Sgt Messer, 17 May 44. (2)
tion at the headquarters near Honolulu. Carl Mann, He's in the Signal Corps Now (New
But Fort Shafter was not listening. The call York: Robert M. McBride & Co., 1943), pp. 144-
49. (3) See also Washington, D. C., Sunday Star,
tape got no response. They tried a manual May 7, 1950, p. A-20, "Corregidor's Radio Opera-
call, and this time succeeded. Shafter re- tor is 'Paying' 8 Years Afterward."
122 THE SIGNAL CORPS
The surrender was about to be broadcast cer Robert L. Scearce sent out "Washing-
again, and its terms allowed no destruction ton No. 3," the last word from Corregidor
of equipment after noon. The men began before it blacked out. The broadcasting
tossing equipment into big containers. A transmitter repeated the capitulation for the
cryptographic machine, a typewriter, and last time; it was the only piece of equipment
an adding machine. They swung axes, not demolished. The Japanese found the
pounded the battered pieces, mixed them, offices neatly swept and bare, the floors
and cast them into piles of wreckage already washed, and blank dials hiding gutted
cluttering the tunnel. The Melbourne and equipment. The surrender involved Signal
Del Monte messages went on their way Corps losses which the Operations Branch
again. Now the delicate interior mecha- in the Office of the Chief Signal Officer set
nisms of radio sets were destroyed with heavy at 712: 50 officers and 662 enlisted men.45
blows. The panels were left intact, so that
45
the Japanese could not accuse the garrison Memo, Col H. L. P. King, Actg Chief of Opns
Br, for Exec Control Br, 22 May 42, sub: Weekly
of having broken up the equipment in vio- prog rpt, Item 2j. SigC (EC) 319.1 Prog Annex
lation of the surrender. Chief Warrant Offi- May-Jun 42, Evaluation Br.
CHAPTER V
Alaska Communications
(January-July 1942)
The attack on Hawaii, and the losses on Umnak to the west, newly established
along the island front from the Philippines air bases guarded the Alaskan approaches.
to Java in succeeding weeks, had turned at- There were garrisons on the Bristol Bay side
tention everywhere to the Pacific, and ac- of the Alaska Peninsula at Naknek, and at
cordingly to Alaska. Military planners in Port Heiden, where Fort Morrow was lo-
Washington were doing what they could to cated. To the westward, in the Bering Sea,
bolster the northernmost Pacific approaches St. Paul and St. George Islands of the Prib-
to America. Early in the war, General Mar- ilof group were first evacuated of whites
shall had warned that Japan could be ex- and natives engaged in sealing activities,
pected to strike a blow in the Aleutian then garrisoned against possible invasion.
Islands, especially at Dutch Harbor, and
possibly even to attempt an invasion of the The Command Network
Alaskan mainland.1 Nevertheless, first
things had to come first; strategists hoped Wherever the American forces went,
that Alaska could meanwhile withstand an specialists of the Signal Corps' Alaska Com-
attack. munication System (ACS) had work to
Admittedly, Alaskan defenses were weak do.2 As the war progressed and the westward
when war began. They remained weak in expansion into the Aleutians inched for-
the first months of war, but at the close of ward, the ACS engineered, constructed,
summer in 1942 there existed at least a maintained, and operated a vast radio,
string of initial outposts along a line run- ocean cable, and landline communications
ning northward from Fort Glenn, at Otter system which knit American bases and con-
Point on Umnak Island, to the Pribilof Is- nected them with the Alaskan mainland and
lands, and thence to Nome. Spearheading with the United States. After 25 March
American defenses in the Aleutians was the 1942 the ACS also engineered and built al-
naval base at Dutch Harbor. At Fort Ran- most all fixed communications: post tele-
dall, on Cold Bay on the Alaska Peninsula phone systems, harbor defense control sys-
east of Dutch Harbor, and at Fort Glenn, tems, radar installations, and the Army
Airways Communications System for the
1
AAF Historical Study 4, Alaskan Air Defense
2
and the Japanese Invasion of the Aleutians, p. 28, For a discussion of prewar organization of the
citing Memo, Marshall for President, 21 Jan 42, in ACS and its place in the Alaskan defense scheme,
WP II-C-1 Alaska 1. AF Archives. see Terrett, The Emergency, pp. 275—79.
124 THE SIGNAL CORPS
6
north ferry routes. Almost as a side line, 110 recruits, basic military training. Addi-
the ACS handled a substantial part of all tional authorizations which followed
signal security and surveillance activities.3 quickly—for 150 men in February, for 50
Three months before war began, the War in March, for 245 in April—brought the
Department's disapproval of General De- authorized strength to 916 men, although
Witt's plea for a separate command radio actual strength at the end of April totaled
net for the Alaska Defense Command only 671.7
(ADC) and its decision to substitute a sup- These men, plus a small group of civilian
plementary command network operated employees at the Seattle headquarters, com-
by the Alaska Comunication System but prised the operators of the ACS radio net-
controlled by the ADC had sent the Signal work, which with its connecting lines was
Corps into action gathering together the already an elaborate installation by 1 Jan-
necessary men, materials, and equipment.4 uary 1942, even though the expansion had
By the middle of January 1942 the veteran barely started. There were radiotelegraph,
1st Signal Service Company, which oper- and often radiotelephone facilities as well,
ated the ACS, had slowly risen almost to its at twenty-three stations besides Seattle, from
maximum allowed strength.5 It was author- Annette in southeastern Alaska to Point
ized 471 men, and had 468. The state of Barrow in the far north. In addition to those
actual warfare, however, expanded every- two, the stations were Ketchikan, Craig,
thing, and emergency tables of organization Wrangell, Petersburg, Juneau, Sitka,
were being thrown overboard. In accord Haines, Skagway, Yakutat, Cordova, Val-
with the policy everywhere, the 1st Signal dez, Anchorage, Seward, Kodiak, Kanaka-
Service Company was asking to commission nak, Bethel, Flat, Nulato, Fairbanks, Nome,
its most highly skilled men, and to enlist as and Kotzebue. All the stations had radio
many more as possible. One hundred and channels or landlines reaching out to com-
twenty-four men were currently receiving mercial stations or numerous other stations
instruction at the ACS school at Seattle, and maintained by the Navy, the Coast Guard,
3
the Department of Interior, the Bureau of
(1) History of the Alaska Communication Sys-
tem (1945), Pt. II, Foreword, "The Aleutian
Fisheries, the Civil Aeronautics Administra-
8
Movement" (hereafter cited as Hist of ACS), pp. tion, and the Canadian Government.
1-4. (See Bibliographical Note.) Bound MS copy For the administrative network necessary
in SigC Hist Sec File. (2) Hist Sec, Alaskan Dept,
Official History of the Alaskan Department, Ch. to meet the wartime needs of the Alaska De-
XIV, "Communications," passim. Bound MS copy fense Command, however, the existing fa-
in OCMH.
4
(1) Ltr, CG Western Defense Comd, to TAG,
cilities were not enough. The expansion
1 Aug 41, sub: Alaska Sig com; (2) 2d Ind,
6
CSigO to TAG, 26 Aug 41; (3) 3d Ind, TAG to Ltr, O/C ACS to CSigO, 12 Feb 42, sub: Bi-
CSigO, 11 Sep 41; (4) 4th Ind, CSigO to TAG, weekly rpt on opns and expansion of ACS. SigC
16 Sep 41; (5) 6th Ind, CG Western Defense AC-25.
7
Comd to TAG, 24 Sep 41; (6) Msg, O/C ACS to First Draft, Alaskan Communication System
CSigO, 22 Oct 41; (7) Ltr, CG Western Defense History (hereafter cited as First Draft, Hist of
Comd to CofS, 14 Oct 41. SigC AC-60 (676 ACS ACS), p. 175. (See Bibliographical Note.) Bound
Expansion). (8) Hist of Alaskan Dept cited n. 3 MS copy in SigC Hist Sec File.
8
( 2 ) , p. 317. (1) O/C ACS Rpt, Radio Facilities of ACS,
5
The unit dated from 14 February 1918. WD 25 Apr 41. SigC AC-63. (2) First Draft, Hist of
GO 18, 14 Feb 18. It was redesignated the 971st ACS, p. 126, App. 38, Chart of ACS and Connect-
Signal Service Company on 10 May 1943. ing Lines, 1 Jan 42.
ALASKA COMMUNICATIONS 125
plan involved setting up ten new ADC sta- The Anchorage station, WXFA, came
tions, and enlarging eleven existing ACS into the ADC net on 20 January. Work
stations. One step provided for restoration started in February with the new materials,
of the Seattle-Seward ocean cable to per- but by that time new stations were coming
mit secret communication between the into the net so rapidly that installations
Alaska Defense Command and the Western had to be made in a somewhat haphazard
Defense Command headquarters at San manner to keep ahead. Antennas went up
Francisco. This cable was put into opera- in spots not entirely suitable. Temporary
tion on 3 December 1941.9 control lines had to be strung to the trans-
A limited radio net, the first section of mitter and receiver stations, and more oper-
the ADC net, could be brought into being ating tables moved into an already crowded
immediately, according to the November operating room. The ACS made arrange-
1941 planning. It would consist of the con- ments for its stations WVD, Seattle, and
trol station at Anchorage, and substations WXE, Anchorage, to use Civil Aeronautics
at Kodiak, Seward, Yakutat, and possibly
Administration sending and receiving equip-
at Annette Island. Accordingly, the ACS
ment. In the event that enemy action or
placed orders for equipment to provide a
carrier telegraph circuit between Anchor- anything else rendered the main control
age and Fairbanks, and a Morse circuit be- cables inoperative, auxiliary Ultrahigh fre-
tween Seward and Anchorage, both to op- quency equipment was installed at West
erate over the open-wire lines of the Seattle and at Fort Lawton to provide three
Alaska Railroad. These telegraph circuits extra channels for transmitting and receiv-
would operate exclusively in the ADC ad- ing. Anchorage was the heart of the com-
ministrative net, thus avoiding the necessity munication system; the circuits were the
for procuring special radio transmitters for arteries and veins which supplied the life-
Fairbanks and Seward. blood. Four types of radio circuits (high-
Meanwhile the ACS at Seattle over- speed, manual, teletype, and radiotele-
hauled all transmitters and other technical phone) and landline and telegraph circuits
equipment available there, and prepared it came into Anchorage. Until late in the
for shipment to Anchorage. Before it could war, when the westward movement had
be shipped, war struck, and the material pushed beyond Alaska and the Aleutians
had to wait for the hard-pressed Navy con- to encircle the Japanese homeland, An-
voy escort vessels. The project was so ur- chorage was always in the throes of expan-
gent, however, that the ACS felt compelled sion, improvement, and change. By the first
to get the work started at once, using such of June 1942, it had progressed to the point
items of equipment as could be found to where it could keep ahead of the new activi-
make temporary installations which would ties and accommodate additional stations
be replaced whenever more material be- as they came into the network.10
came available This was the pattern that 10
(1) Ltrs, O/C ACS to CSigO, 9 Mar 42 and
the ACS followed in every case. 20 May 42, sub: Biweekly rpt on Opns and expan-
sion of ACS. SigC AC-25. (2) Hist of ACS, Pt.
9
Msg, ACS Seattle to CG Fourth Army Presidio, III, "Anchorage," pp. 4-5. (3) First Draft, Hist
3 Dec 41. SigC 413.4 No. 1. of ACS, pp. 179-84.
126 THE SIGNAL CORPS
Kodiak, Otter Point, Dutch Harbor DBR-1, put together in the ACS shop, and
known as the "Damn Big Rush" because
In the first weeks of war, the expansion of the haste and improvisation which had
plans moved anxiously forward toward gone into its construction. The new equip-
Dutch Harbor and Otter Point on Umnak. ment to be added would all be of the same
Continuous wave transmission at both me- standard design used in the new Alaska De-
dium and high frequencies from there to fense Command stations. It included one
ADC headquarters at Anchorage would be medium-frequency 750-watt transmitter (an
provided, with each of the two new stations obsolete marine transmitter completely re-
manned by three ACS operators.11 By the built and modernized in the ACS shop at
last week of December, Cold Bay and Port Seattle); one high-frequency 300-watt
Heiden on the Pacific side of the Alaska transmitter; two 15-kva auxiliary power
Peninsula had been added to the lengthen- plants; an operating table and control equip-
ing list of ACS stations. The Seattle district ment; six combination high and medium-
engineer of the Corps of Engineers had frequency receivers; and a complete trans-
agreed to undertake construction of build- mitting and receiving antenna and ground
ings to house the equipment and men. At system, along with Quonset huts to house
Seattle the ACS was ransacking its stores both the equipment and the men.13
for extra equipment which could be thrown Although Anchorage held first priority in
into use at the new stations temporarily, the expansion of the Alaska Communica-
regular equipment not being expected for a tion System stations, twenty others followed
matter of several months. Each of the two closely. In order came Kodiak, Otter Point,
construction parties, with an officer at the Dutch Harbor, and Yakutat, at all of which
head, was to consist of only six soldiers and construction was under way by April, Cor-
five civilians. Three of the soldiers in each dova, Sitka, Fairbanks, Juneau, and a dozen
party were to remain behind, when tem- others.14
porary construction had been completed, to Mountainous Kodiak Island, which lies
establish initial communications.12 at the mouth of Cook Inlet and forms the
In refurbishing and enlarging the eleven irregular western shore of the Gulf of Alaska,
existing ACS stations included in the expan- was of particular value strategically. The
sion program, there could be no thought of Navy had its main base there; and nearby
complete uniformity of equipment. Those the Army had built Fort Greely and named
stations, built in the peaceful years when it in honor of the Signal Corps' famed Chief
the Army budget was lean, contained a col- Signal Officer and founder of the Alaska
lection of equipment of such variety as the system, Brig. Gen. Adolphus W. Greely.
budget had happened to permit during the When the Navy began building there in
particular year when each was built. Among
1939, it found a small ACS station already
the transmitters were several models of the on hand in Kodiak village, a settlement of
11
Ltr, O/C ACS to CSigO, 16 Dec 41, sub: Indian fishermen. Now in early 1942 the
Progress rpt of instls at Dutch Harbor and Otter
13
Point. SigC AC-25. First Draft, Hist of ACS, p. 180.
12 14
Ltr, O/C ACS to CSigO, 22 Dec 41, sub: Ltr, O/C ACS to CSigO, 7 Apr 42, sub: Bi-
Prog rpt on instls of new stations in ADC expan- weekly rpt on opns and expansion of ACS. SigC
sion program. SigC AC-25. AC-25.
ALASKA COMMUNICATIONS 127
station was being enlarged to include a di- Otter Point across Umnak Pass. The only
rect Seattle-Kodiak high-speed radio circuit, communication was a tactical radiotele-
an ADC tactical circuit, equipment for the phone set operated by Coast Artillery men
aircraft warning flash radio net, and fire in an abandoned Aleut Indian hut at Cher-
control circuits for harbor defenses. Freez- nofski. This set worked the Coast Artillery
ing temperatures and high winds hampered set atop Mount Ballyhoo, near Dutch Har-
the work, but on 11 May the Kodiak-Seattle bor. Although the channel could handle
direct circuit was established. In the same both continuous wave (code) and voice,
month, an ACS engineer arrived to take there were no code operators, so messages
charge of the enlargement and installation went out by voice, the phonetic alphabet
of the Fort Greely post telephone system; being used for enciphered messages. Across
a private contractor hired by the Navy had the pass at Otter Point, a Quartermaster
started it, but his work had been unsatisfac- soldier operated a battery set borrowed from
tory to the post commander.15 a Navy gunboat. This set weighed almost
In order of urgency after Anchorage and 100 pounds, but was not very powerful.
Kodiak ranked the Otter Point project The men had developed a sort of double-
(Fort Glenn) on Umnak Island, where an talk as an informal cryptographic procedure
important airfield was being built, and the when discussing shipments on the air.
ACS station at Fort Mears, the Army post The channel of communication from the
at Dutch Harbor on Unalaska Island. One United States to what would become Fort
of the small Signal Corps groups organized Glenn was from Seattle to Anchorage by
at Seattle and 1st Lt. Richard R. Murray Alaska Communication System facilities;
had arrived in the area in February. then by relay to NPR, the Navy station at
Through contrast, the two projects pointed Dutch Harbor; then (by teletype if it hap-
up the peculiar difficulties of Alaskan de- pened to be operating and by messenger if it
fense construction. Unalaska Island had was not) to Fort Mears' post headquarters;
fine harbors, but surrounding high hills and then to the post cryptographic unit for de-
mountains offered little space for air facili- ciphering; on to the commanding general
ties. Separated from Unalaska only by the for his attention; after editing, back to the
twelve miles of open water constituting cryptographic unit to be enciphered once
Umnak Pass, Umnak Island lay low and more; then by messenger once a day to the
flat; its terrain invited airfield construction, Coast Artillery set on Mount Ballyhoo; via
but there were no harbors where ships could that set to Chernofski; and finally, via voice
anchor to bring in supplies. radio to the old gunboat set at Otter Point.
Since the Navy had good radio facilities It took three or four days for messages to
already in operation at the big base at arrive from the United States and, because
Dutch Harbor, the Otter Point station drew of the numerous relays and handlings, much
Murray's attention first. The base which of the message matter was badly garbled by
was to become Fort Glenn was still a-build- the time it reached the ultimate recipient.16
ing, with post headquarters temporarily lo- Murray put three men trained in con-
cated at Chernofski, the most westward tinuous wave transmission in each of the
point on Unalaska and the one closest to three stations at Chernofski, Otter Point,
15 16
Hist of ACS, Pt. III, "Kodiak," pp. 1-4. Ibid., Pt. III, "Fort Glenn," pp. 1-4.
128 THE SIGNAL CORPS
and Mount Ballyhoo. This speeded up mat- immediate prospect of passage. A Navy de-
ters appreciably. He installed a small stroyer finally took them and their baggage
Intervox radiotelephone transmitter and re- across, and they arrived at 1600 on 13
ceiver in a hut at Chernofski, and erected March, only to find that there were no liv-
an antenna for use with a similar set at ing quarters or tents available to them.
Otter Point. This system and a ship-to- Before nightfall, a carpenter put up a struc-
shore radio set installed on a tug took care ture known as a Yakutat hut, a windowless
of ship and barge movements between Otter affair 16 by 16 feet in size. This building
Point and Chernofski. Meanwhile, the housed 9 men, but a month later a housing
radio equipment for the ACS station at shortage developed when 6 more soldiers
Otter Point had arrived ahead of the men arrived from Seattle. Now the hut had to
who would install it. They had been delayed serve as shelter for 15 persons.
en route by the grounding of their trans- By April all the antenna poles for the
port. The equipment was stored in tents radio station were up, and the wiring and
on the beach at Chernofski until it could be equipment installed in the main building:
moved by barge across Umnak Pass. There a 20 by 20-foot frame structure erected on
were only five barges to move material, and the flat eastern end of Umnak Island. The
food and ammunition for the troops at power plant was sheltered in a tent.17
Otter Point had first priority. In succeeding When this station serving Fort Glenn
months, the ACS men were to learn much opened for business on 20 March under the
of the difficulties of transshipping to Otter call letters WXFN, its messages for the
Point. The number of supply ships coming United States could be relayed to Anchor-
in exceeded the number of tugs and barges age, which relayed them back to the Navy
available to haul the material across the station at Dutch Harbor. Here they were
pass. Boxes containing material which turned over to the commanding general for
might be a part of a project shipment often editing, censorship, or approval, after which
got separated from other boxes of a unit. they were enciphered again, returned to the
Each organization wanted its equipment Navy station, and retransmitted to Anchor-
moved first. The post commander finally is- age and thence to the United States over
sued an order prohibiting expediters from ACS facilities. This awkward backtracking
individual units from going to Chernofski was far from satisfactory, but the Coast Ar-
at all, since, as an ACS liteutenant once tillery station at Dutch Harbor operated on
radioed, there would be "twenty or thirty a flash warning net of 2,092 kilocycles, and
persons on the beach at Chernofski cutting the nearest frequency on which WXFN
each other's throats to get their equipment could meet it was 3,885 kilocycles. To re-
moved first." ceive signals from WXFN the operator at
Even though the material for the first Dutch Harbor had not only to listen at
project was all gathered at Chernofski, 3,885 kilocycles, but also had to leave the
Lieutenant Murray learned that it might flash warning net, since the station had only
be several weeks before he could get it one battery-operated receiver. It was impos-
across the pass. When it was shipped to sible to use any of the ACS receivers because
Otter Point the second week in March, the no 110-volt power supply was available.
men were left at Chernofski without any 17
Ibid., Pt. III, "Fort Glenn," pp. 1-5.
ALASKA COMMUNICATIONS 129
This meant a return to the old system of The Attack on Dutch Harbor
landline telephone circuits, radio stations,
radiotelephones, and messengers. In an ef- By mid-May 1942 Army and Navy com-
fort to eliminate the cumbersome proce- manders had been alerted for an imminent
dure, Lieutenant Murray hurried back to attack in the Aleutians.19 At the Navy base
Dutch Harbor to set up a temporary station at Dutch Harbor, the Army post at Fort
there. Mears on Unalaska Island, and the airfields
A temporary site on the swampy floor of at Fort Randall to the east and Fort Glenn
Unalaska Valley offered excellent ground- to the west, the meager military forces were
ing possibilities, unusual in the Aleutians, disposed as advantageously as possible to
where the loose, porous volcanic ash, which meet the attack, which intelligence sources
was the chief component of the soil, made estimated would occur the first week in
20
grounding difficult. Putting in 70-foot an- June. At the temporary ACS station at
tenna poles, built of 15-foot 4 by 4 timbers Dutch Harbor, Lieutenant Murray and his
spliced together with bolts, presented numer- little crew of Signal Corps soldiers and
ous difficulties. Not the least of these was civilians buried the spare cash and a supply
the problem of getting tractors, since there of radio tubes behind the station, readied
was a shortage of such motive power, and slit trenches, and rehearsed arrangements
the tractors on hand were constantly busy to burn the building and destroy the trans-
21
hauling guns, ammunition, and supplies to mitter if the post was overrun.
points otherwise inaccessible. The men work- On the morning of 3 June, radar on
ing on the antenna poles always needed at board a seaplane tender in the harbor de-
least two tractors, because one often bogged tected the approach of enemy aircraft at
22
down in the swampy ground and needed 0540. In the ACS radio station, a sergeant
the other to pull it out of the mud. Each pole tapped out a telegraph message for Anchor-
had to be sunk 5 feet in the top of a 20- age: "Fort Mears is about to be bombed
foot hummock of earth, for an effective by enemy planes." Then he hastily sought
height of 85 feet, and braced and steadied better shelter, for by that time Japanese
by guy wires attached to foot-thick piling fighter planes were strafing the area. The
butts buried 5 feet deep. two enemy air strikes at Dutch Harbor that
Despite the hazards imposed by the un- morning destroyed or damaged a number of
predictable Aleutian weather, including a Army and Navy installations. The most
100-mile gale which swept through the val- critical blow of all, in the opinion of Air
ley while the men were checking guy wires, Forces' director of communications, Col-
the temporary station went into operation
within a week's time, making contact first 19
(1) Samuel Eliot Morison, History of United
with Kanakanak, then Fort Glenn, and fi- States Naval Operations in World War II: IV, Coral
Sea, Midway and Submarine Actions, May 1942-
nally Anchorage. On 5 April the station took August 1942 (Boston: Little, Brown and Company,
over all Army traffic from the Navy station 1950), 165-74. (2) Craven and Cate, The Army
NPR, and inaugurated commercial traffic Air Forces, I, 464.
20
Morison, History of U. S. Naval Operations,
on 3 May.18 IV, p. 166.
21
Hist of ACS, Pt. III, "Dutch Harbor," p. 1.
18
Ibid., Pt. III, "Dutch Harbor—Before and 22
Morison, History of U. S. Naval Operations,
After Bombing," pp. 6-13. IV, p. 176.
264-211 O - 78 - 10
130 THE SIGNAL CORPS
onel Marriner, was the loss of Signal Corps near the station, possibly because this time
equipment intended for a radar installation the Japanese planes from one carrier had
at Cape Wislow on Unalaska Island. This unwittingly selected the western end of
equipment and a medium-frequency radio Unalaska Island as their rally point. There
transmitter were destroyed in a warehouse they were met by American fighters from
fire touched off by the bombing at Fort Fort Glenn, P-40's which engaged the
Mears. Replacements were not available ex- Japanese dive bombers and fighters in air
cept at the cost of sets scheduled for delivery battles through the 500-foot overcast.24
to the South Pacific bases.23
The next day, when the enemy fighters, The Repercussions of Dutch Harbor
dive bombers, and high-level bombers re-
turned for another attack, they struck re- The Japanese had planned the Aleutian
peatedly at the Navy radio station, particu- attack as the northward prong of a co-
larly at the steel towers. They scored no ordinated campaign reaching out into the
direct hits, but they smashed tubes and Central Pacific toward Midway Island.
knocked down the receiving antennas. No The southward prong was snapped off by
planes came near the ACS station, which the naval and air battle of 3-6 June off
continued to handle communications for Midway Island. Though the Japanese plan
the area while the Navy station, with its to take Midway had failed, the Aleutian
receiving antennas knocked out, could only attack had yielded a consolation prize. Be-
send "blind." Apparently the Japanese did tween 7 and 21 June, the enemy forces oc-
not suspect the presence of a second station cupied Attu and Kiska in the outer Aleu-
at Dutch Harbor, since they concentrated tians. To prevent development of either
their attack on the Navy towers. The ACS island as a major enemy base was im-
station no doubt escaped notice because its portant. Wherever American forces garri-
antenna poles were grouped inconspic- soned Alaska, reinforcements now moved
uously, near a number of power poles. From in. Crews worked harder and longer on the
the air it was difficult to detect. Alcan Highway, the military supply road
Across Umnak Pass at Fort Glenn, the begun in March 1942 and now pushing up
Japanese were unpleasantly surprised to find north on its inland route. Communication
an American airbase at their backs. In the projects not yet completed assumed greater
fog and mist which covered the islands, the urgency, and plans for new ones were born.
Japanese did not notice the Umnak air- At Dutch Harbor, meanwhile, Lieuten-
strip on the first raid, but found an obvious ant Murray had been fretting over delays
target in the Alaska Communication Sys- in building the permanent Alaska Commu-
tem station standing in the open on the nication System station. As a matter of fact,
flat beach, surrounded by antenna poles. until the Japanese attack, the plans for a
Fighters strafed the station area with ma- permanent Army communication station
chine gun fire, but inflicted no damage. On in the Dutch Harbor area were not firm.
the second day, the invaders did not get It was felt that perhaps the Navy station
23 24
(1) Craven and Cate, The Army Air Forces, I, (1) Hist of ACS, Pt. III, "Fort Glenn," pp.
469. (2) Hist of ACS, Pt. III, "Dutch Harbor," 5-6. (2) Craven and Cate, The Army Air Forces,
pp. 2-5. I, 466-67.
ALASKA COMMUNICATIONS 131
should handle military communications for cables opened for traffic late on 1 July
26
Dutch Harbor, primarily a Navy base, while 1942.
the ACS temporary station acted as an The cable gave trouble at first. Initially,
auxiliary. After the bombings, doubts about it was a problem of different transmitting
the need for more communication facilities procedures; at one end of the line the ACS
vanished. Orders went out to erect a bomb- operators used one sort, while at the other,
proof shelter for the permanent ACS sta- tactical operators used another. Then the
tion, and to connect Dutch Harbor and the poorly insulated field wire landlines at the
Fort Glenn airfield by an ocean cable to end proved unable to withstand the ravages
provide communication privacy. of tractor cleats, and the circuit had to be
While crews blasted away a rocky hill- rerouted through post telephone cables lo-
side to provide the bombproof shelter, the cated conveniently nearby. Trouble with the
cableship Restorer came up from her pre- shore-end cables developed next. With no
vious assignment at Petersburg in south- heavy-duty cable available, the smaller
western Alaska to make the Mears-Glenn deep-sea cable had been run right up to
lay. Still in her holds were about 120 miles the cable huts on the beach. But the rough,
of deep-sea repair stock cable belonging to rocky beaches and the frequent storms soon
a commercial company. This cable con- damaged the shore ends of the cable, and
tained almost 500 pounds of copper per ship anchors broke it. The Restorer came
mile, four times as much as was contained back in September, repaired the cable, and
in the cable the ACS used ordinarily. But substituted heavier shore-end lines.27 After
as it turned out, it was also the only cable that the cable operated so successfully that
available anywhere on the west coast, and late in the year the commanding general of
the ACS requisitioned it at a cost of the Western Defense Command asked for
25
$154,482. a complete cable system connecting An-
The actual laying of the cable proved to chorage with all stations on the Aleutian
be uneventful. The weather was best at chain.28
that time of year, and the Restorer made Of the ten new Alaska Defense Command
the run from Juneau to Dutch Harbor in stations to be built, six had not yet been
ten days. Thick fog and high winds ate up started when Dutch Harbor was attacked.
three days' time, but within a week the 73- They were Boundary, later known as North-
mile lay between Fort Mears and Fort way, Big Delta, Gulkana, Galena, Naknek,
Glenn was completed, as well as the 12-mile and the Bethel airfield station. The material
lay across Umnak Pass to Chernofski. The had been on hand in Seattle since April, but
shipping space was scarce, and the ACS
25
Hist of ACS, Pt. III, "Dutch Harbor," p. 16, engineering organization which would han-
and "Foreword to Voyages of Cableships," passim. dle the projects had not been completed.
The lack of cable and cable machinery led di- Now the matter could wait no longer.
rectly to the development of a new American in-
dustry, cable machinery design and manufacture. Emergency stations must go in at once. Col.
Previously such equipment had always come from Fred Andrews, chief of the Alaska Commu-
England, but by the close of the war, a thriving
26
development was under way by a Seattle concern, Hist of ACS Pt. III, "Wartime Voyages of
Sundfelt Equipment Company. History of the Cableship Restorer," pp. 1-13.
27
Plant Engineering Agency, p. 214. SigC Hist Sec Ibid., Pt. III, "Dutch Harbor," pp. 16-18.
28
File. Hist of Alaskan Dept, p. 327.
CABLE-LAYING OPERATIONS IN ALASKA. Cable is shown being laid along the
shore at Fort Mears, above. Below, the cableship Restorer.
ALASKA COMMUNICATIONS 133
nication System, sent Maj. Charles F. Fel- almost around the clock. In that heavily
stead northward to build the stations and set wooded section of Alaska there was no need
up the engineering organization without to set antenna poles; trees would do.
further delay. By evening of 19 June radio contact was
Major Felstead and Alfred K. Robinson, established between Northway, Big Delta,
chief civilian radio engineer for the ACS, and Fairbanks. By the next day Gulkana
arrived in Fairbanks on 17 June. Within was on the air and in contact with Big Delta
twenty-four hours they had combed the and Anchorage. Meanwhile, to the south-
town for good radio receivers and transmit- west of Fairbanks at the Bethel station on
ters, and had bought four of each from local the Kuskokwim River, Sergeant Vande-
radio amateurs. They had located a fifth water had sent a man across the river to the
set, owned by the ACS operator at Bethel, site of the proposed Army airfield to estab-
M. Sgt. Kenneth A. Vandewater. They had lish a temporary ADC station. It was in con-
commandeered six trained men from the tact with the Bethel station on 20 June. By
Fairbanks ACS station, and had formed that time, the technical men from each of
them into three two-man teams, one opera- the installation teams sent to Northway and
tor and one technician to a team. They had Big Delta had returned to Fairbanks, leav-
furnished each team with a transmitter and ing the operators behind to man the sta-
a receiver, a doublet antenna already cut to tions. The technicians started out again
frequency, a telegraph key and headphones, with the last of their receivers and trans-
and switches for transferring the antenna mitters, this time due west for Galena.
from transmitting to receiving. They had Within twelve hours that station, too, was
persuaded the Civil Aeronautics Adminis- in operation.
tration to give the new stations temporary Thus within a space of three days and in
houseroom in CAA station buildings at a giant circle from Fairbanks, five of the
each site, and to provide power from CAA six remaining stations of the Alaska Defense
power supply units. Command now were put in operation on an
Early on the morning of the second day, emergency basis. A week later Engineer
the three teams set out from Fairbanks with troops arrived at these points to establish
their radio equipment, sleeping bags, and construction camps. The regular equip-
a week's supply of C rations. They headed ment for the permanent stations, delayed
southeast, one team traveling by commer- by lack of shipping space, did not arrive
cial airplane for Northway, near the Yukon until July.29
Territory line, while the others drove ACS Naknek, the site of the sixth station
trucks southeast on the Richardson High- southeast of Fairbanks on Bristol Bay, was
way to Big Delta, at the junction of the still partially iced in when Dutch Harbor
Tanana and Delta Rivers, and then farther was attacked. ACS engineers were already
south to Gulkana on the Gulkana and on the spot waiting when a task force vessel
Copper Rivers. anchored off shore on 3 July and started
Those were the longest days of the year. lightering men and equipment ashore at
The sun barely dipped below the horizon high tide, the only time barges could ply
for an hour each night, and the men,
snatching only a few hours' sleep, worked 29
First Draft, Hist of ACS, pp. 200-202.
134 THE SIGNAL CORPS
the shallow river. The station went on the tiny, isolated islands in the Bering Sea, and
air the next day, 4 July, relaying through were preparing to move against the main-
Kanakanak, and a month later made con- land to take Nome. In peacetime the islands
tact with Anchorage to complete the first operated under the jurisdiction of the Fish
phase of the northern chain.30 and Wildlife Service, but natives and gov-
Of the eleven existing ACS stations origi- ernment officials had been evacuated hur-
nally slated for expansion, Sitka had been riedly after the Dutch Harbor attack. On
rather far down on the list. Now as the site Sunday morning, 7 June, ACS headquar-
of the third-ranking naval base in Alaska it ters at Anchorage received orders to get
acquired new importance. With a crew of four men ready to leave that afternoon for
eight enlisted men and one civilian engineer, an unknown destination. There was no time
1st Lt. Charles M. Beach arrived at Sitka to pick and choose; four privates were se-
in mid-June to remove the transmitter from lected at random out of a group of newly
its location in the middle of town to a re- arrived men, and told to get ready to leave
mote site several miles away. He was also with the Army intelligence teams, which,
to construct a control cable from the opera- they eventually learned, were headed for
ation site in Sitka to the transmitter site and the Pribilofs. Two ACS men were to be
to rearrange the operations layout. stationed at St. Paul, and two at St. George.
Because Sitka, the old Russian capital of When the first pair, Privates Mackie and
Alaska on Baranof Island in southeastern Phillips, arrived at their destination on St.
Alaska, lies in a heavily wooded area, the Paul Island on 22 June, they found the area
Seattle headquarters had assumed that poles deserted but unmolested. In hurried flight
would be available locally. Beach found after the Dutch Harbor bombings, the na-
that actually there were none to be had, and tives had left everything they could not
there were no logging operations going on carry with them. The two soldiers, fur-
in the vicinity. He and his crew turned nished with emergency equipment only,
loggers for a few weeks and cut their own had been told to make use of anything still
poles, including several 90-footers. This sit- left on the island. They established contact
uation immediately increased their difficul- the first day with the other two operators
ties, for the weight of a green pole is three at St. George, and then set about ener-
times that of a seasoned one. To add to his getically taking stock of material on hand
woes, the lieutenant found that although and helping to set up the outpost. They
he had six men fresh from a three months' started 24-hour radio watch, insofar as the
training course at Fort Monmouth and clas- equipment would permit, rigged blasts
sified as linemen, five of them had never which could destroy the radio station in
had on a pair of climbers, much less climbed case of attack, and settled down to the job
a pole. He set out to teach his "linemen" a of repairing and improving facilities, work-
lineman's most fundamental requirement.31 ing usually 16 to 17 hours a day. Traffic
Meanwhile, no one was sure what had was light; the men sent out one message a
happened in the Pribilof Islands. Rumor day, and few came in. During flying hours
had it that the Japanese had occupied the they kept continuous watch on aviation fre-
30
Hist of ACS, Pt. III, "Naknek," pp. 1-3.
quencies for flash information. On St.
31
Ibid., Pt. III, "Sitka," pp. 1-5. George Island, the second team led a simi-
ALASKA COMMUNICATIONS 135
lar existence. By August the men were ap- Hasty outfitting for the project accounted
prehensive about what life would be like on for some deficiences, but to a greater de-
the barren islands during the winter. Then gree they reflected the universal shortage
came word that troops would be landed of materials and shipping space. Supply
before winter, and the outposts manned. agencies had to shortchange many a re-
This was the beginning of the stations in quisition, sending half a supply-loaf in the
the Pribilofs: a matter-of-fact handling of a hope that it would be better than none at
difficult and dangerous assignment that was all. Troops in Alaska lacked many items in
to earn all four young soldiers praise from the summer of 1942; among others, field
Colonel Andrews, who pointed out their switchboard equipment, telephones, and
"unusually capable solution of field engi- wire, requisitions for which remained un-
neering problems that would normally have filled.34 To men living in remote posts under
called for engineer or non-commissioned of- the threat of enemy attack and without ade-
ficers of considerably greater rank and ex- quate communications protection, the short-
perience." 32 age of equipment in the early part of the
Signal equipment for the Fort Morrow war was often incomprehensible. It was nat-
station at Port Heiden on Bristol Bay left ural that they should see only their own
Seattle in late June with the Engineer troops, problem, and not see it in relation to the
and 1st Lt. Harold A. Cordes took along whole war situation. It was difficult for them
a portable 30-watt transmitter, receiver, gen- to understand that their lack of equipment
erator, and antenna. When four more ACS was not a malignant fault of Army red tape
men arrived at the station a few days after or negligence. Officers who might be inex-
the first group, they brought with them a perienced in military supply matters had
100-watt transmitter capable of contact small realization of the time involved in pro-
with Anchorage. The men still lacked many ducing and transporting material, in mo-
things they needed to build the station: sev- bilizing and training men, or of the greater
eral kinds of wire, fittings and couplings, urgency of the situation at other points on
insulators, cement, rope, gasoline, and oil. the world-wide battlefield. In April 1942,
Ingenuity cured some shortages; for exam- an officer stationed at Anchorage made a
ple, no bowl-type insulators were sent, so plea for a "small reserve" of 15 student radio
the men used two kitchen mixing bowls. operators, six emergency power units with
Borrowing overcame other shortages. Lack- some cable, two complete high-frequency
ing enough wooden poles for transmission and two low-frequency radio stations, and
lines and antennas, they borrowed wooden four complete transceivers of a type similar
pilings from the Engineers. The miscellane- to the walkie-talkie sets. It was not too much
ous shortages were funny but exasperating: to ask in order to bring about the service
there were only three legs for the operations which the station wanted to provide. It was,
table; a heating stove, but no cook stove;
however, more than a hard-pressed Signal
an ironing board, but no iron; ten doors
for Quonset huts, but no hardware with Corps could give under the carefully con-
which to hang them.33 34
Rpt, Lt Col W. C. Henry, SigC, to Dir of
32
Ibid., Pt. III, "Lonely Vigils in the Pribilofs," Army Com Sv, sub: SigC svs and facilities in
pp. 1-11. Alaska as of 20 Aug 42. Hereafter cited as Henry
33
Ibid., Pt. III, "Fort Morrow," pp. 1-11. Rpt. SigC 319.1, Inspec Rpts, 1.
136 THE SIGNAL CORPS
Also their construction parties needed mo- to the 18th Engineer Regiment, for exam-
bile communication units to keep contact ple, ten had received very little training,
with their bases. Three types of communica- and two of them only two or three hours.
tions were planned to serve the pioneer tote Before he left Seattle, the sergeant in charge
road and later the completed highway: of the group bought $1.98 buzzers that
radio, telephone, and teletype, in that order. sounded like doorbells; when the group ar-
Radio, the most portable and easily in- rived at Whitehorse he set the men to work
stalled, would go in first. After it would in code classes using these buzzers.37
come a 2,020-mile telephone line which By 22 April the detachment of five men
would also carry facilities for teletype, from had already set up a small 75-watt station
Edmonton in Central Alberta to Fairbanks at the railhead, Dawson Creek, to com-
in interior Alaska. municate with Fort St. John. The station at
Plans called for two sectors, one in the Fort St. John, WXCD, was scheduled to go
north centered at Whitehorse, in Yukon on the air and work Ketchikan beginning
Territory, and another in the south extend- 5 April, but delays and difficulties inter-
ing from Fort St. John to Watson Lake. vened. Station WXCE at Fort Nelson, 200
Operating out of each sector would be three miles farther to the northwest, got in touch
16-man Signal Corps teams, one for each with Ketchikan on 29 April. Contact was
of the six Engineer regiments on the road. not good, both because of high frequency
Each team would have a base section of fadeouts common in northern latitudes, and
four men, who would operate a fixed 250- because the student operators were slow and
watt radio station to maintain contact with inexperienced.38
the other men of the detachment, who But student operators could and did im-
would operate mobile units of SCR-193 prove fast. Some of the command cars
transmitting and receiving sets installed in worked along supply routes. Others bumped
command cars to accompany the construc- and lurched right behind the giant bull-
tion parties on the road. In addition, there dozers that were cutting the highway out of
would be a railhead signal detachment of the virgin wilderness. Camps moved every
five men operating a 75-watt fixed station two or three days, and the signalmen moved
at Dawson Creek. While the mobile units with them. They slept in tents or on the
would keep contact with their respective ground through the cold, early spring
base section stations, the base stations in
turn would communicate with each other 37
(1) Ltr, CO Ft. St. John Sector, Alfon High-
and the railhead station, and would relay way, to CO's All Units and Detachments, Ft. St.
John Sector, Alcan Highway, 1 Jun 42, sub: Sig
their messages to the United States through plan. SigC OT 320.2 Northwest Service Command,
the Alaska Communication System station General 1942-43. (2) Memo, Alaska International
Highway, 22 Apr 42. SigC 676.3 (CC CEB) Alas-
at Ketchikan, WXH, in the Alaskan pan- ka. (3) First Draft, Hist of ACS, pp. 213-14. (4)
handle 450 miles west of Fort St. John. At Interv, SigC Hist Sec with 2d Lt C. V. Connellan
Fort Lewis, Washington, men of the 60th (formerly radio operator at Whitehorse, Y. T.),
9 Nov 43.
Signal Battalion had been training for as- 38
(1) Ltr, OCSigO, to O/C ACS, 2 Apr 42,
signment to the Alcan project. But there sub: Estab of scheds; (2) Copy of ACS msg, 29 Apr
42; (3) Ltr, Actg O/C to Traffic Div OCSigO,
had been too little time to do a thorough sub: Tests, Ketchikan-Ft. Nelson Circuits. SigC
training job. Of the sixteen men attached 676.3 (CC CEB) Alaska.
138 THE SIGNAL CORPS
weather, through the mud and mosquito- was in critical supply, and what there was
ridden late spring, the dry, dusty, insect- of it would have to be hoarded for the most
laden summer. Operational and routine re- urgent military uses. These were the con-
ports formed most of the traffic, but there siderations that shaped General Olmstead's
were life-and-death messages, too. Radio reply: that the desired wire project should
directed rescue parties seeking lost men, be based upon military necessity after the
sought and gave medical advice, warned of highway had been completed.
forest fires and bad stretches of road that In other words, the Engineers would
had been gulped down by the custardlike have to get along as best they could with
muskeg.39 only radio facilities while the pioneer road
Useful as the mobile units and base sta- was being built, and the Signal Corps
tions were, the Corps of Engineers, the would continue to do as it had been di-
Alaska Communication System, and the rected, to build the minimum facilities for
Army Air Forces knew that radio transmis- handling of message traffic essential to the
sion was not entirely satisfactory in the war effort. Nevertheless, the Engineers,
northwest. Atmospheric and magnetic phe- joined now by the Public Roads Adminis-
nomena caused serious interference. Fur- tration, which would build the finished
thermore, no matter how adequate the sta- highway to replace the Engineer-built
tions and frequencies, or how regular the pioneer road, pressed the matter. The origi-
transmission and reception, there was no nal directive on the highway was silent
guarantee of security. The problem became regarding signal communications, and the
even more acute as each new radio circuit Chief Signal Officer agreed that it would
was established. A wire system to supple- be proper to carry the matter to "higher
40
ment radio seemed the answer. authority": to the Commanding General,
In March 1942 the Chief of Engineers Services of Supply. Tentative details set
had asked the Chief Signal Officer to submit forth on 4 June in a letter from the Chief
recommendations for wire communication Signal Officer to the Director of Require-
along the Alcan Highway to augment ments proposed one phantom group, con-
radio. Without a doubt, in less trying sisting of four wires placed on a pole line
times the Signal Corps, an old hand at having 40 poles per mile, to provide two
telephone line construction, would have physical circuits, one phantom circuit, and
welcomed such a challenging opportunity. four grounded telegraph legs; as well as
But signal construction units were in de- one three-channel carrier system which
mand at Allied bases everywhere. None would make available three talking chan-
could be spared without proof that a tele- nels, one of which would be modified to
phone line in Alaska was a critical military provide for five to seven telegraph channels.
necessity. Additionally preliminary estimates Such a line would cost about $1,600,000
indicated that the pole line would require at and could be finished at the same time as
41
least 3,000,000 pounds of copper. Copper the road.
39 41
First Draft, Hist of ACS, pp. 210-15. (1) Ibid., p. 8. (2) 1st Ind, CSigO to CE,
40
Capt Sidney L. Jackson, Stringing Wire To- 26 Mar 42, to Ltr, CE to CSigO, 18 Mar 42, sub:
ward Tokyo: A Brief History of the Alaska Military Wire sv for const crews, International Highway.
Highway Telephone Line (1944), SigC historical SigC OT 320.2 Northwest Service Command, Gen-
monograph E-l, p. 6. SigC Hist Sec File. eral 1942-43.
ALASKA COMMUNICATIONS 139
Two weeks later the Services of Supply Included were the Royal Canadian Corps
granted permission to build the wire line, of Signals, Royal Canadian Air Force, Ca-
and directed the Chief of Engineers to make nadian Department of Transport, Rural
the necessary funds available to the Signal Electrification Administration, Public Roads
Corps. Even before the project was ap- Administration, Army and Navy Electronics
proved, and in the next few weeks there- Production Agency, War Production Board,
after, a series of conferences got under way, Transportation C o r p s , Quartermaster
in Washington, D. C., and Seattle. By Corps, Army Air Forces, Alaska Defense
August, after a long second look at the whole Command, Northwest Service Command,
undertaking, the Signal Corps found that Northern Alberta Railways Company, Al-
its relatively modest proposal had grown berta Government Telephones, Canadian
enormously in scope and estimated cost. National Telegraphs, Bell Laboratories,
Rather than a phantom group and one Graybar Electric Corporation, Railway
three-channel carrier circuit, the Fairbanks- Express Agency, Miller Construction Com-
Edmonton network now envisioned called pany, and Onan-Smith Construction Com-
for two carrier circuits to provide five carrier pany.44
telephone channels, three voice-frequency The outlines of the Signal Corps' organi-
circuits, twelve through telephone circuits, zation for the project began to take shape
and two or three local telegraph circuits. by the end of August 1942. Within the Of-
Connections with the United States would fice of the Chief Signal Officer, the ex-
be established by means of a third carrier panded Plant Division would have primary
system linking Edmonton and Helena, Mon- responsibility. To Maj. Ora F. Roberts, of-
tana, and including two carrier telephone ficer in charge of the wire section of Plant
channels and twelve telegraph circuits. The Division, would fall the ticklish job of di-
cost had been revised upward to about recting ACS field force construction. He was
$4,300,000.42 to find that his most baffling questions would
A large number of organizations were con- be posed not by nature, but by the admin-
cerned in some manner or another in the istrative jungle into which he was about to
project. The two most important were the plunge.45
Corps of Engineers, which was building the To relieve him of the radio installations
pioneer road and which was responsible for along the highway and on the Canol pipe-
construction projects for the Army, and the line, now making its entry on the north-
Western Electric Company, which con- west stage, Roberts would have the services
tracted with the government to furnish of Capt. Burton Cole, a Western Electric
much of the equipment and the civilian spe- engineer commissioned directly from civilian
cialists who would make the actual installa- life. Since there were not enough Signal
43
tions. But at one time or another, the Sig- Corps construction troops to go around, ci-
nal Corps dealt with an imposing list of vilian crews would have to be used to build
government agencies and private concerns. the pole line. Capt. Henry H. Bartlett, who
42 44
(1) Jackson, Stringing Wire Toward Tokyo, 45
Ibid., p. 72.
pp 9-10. (2) Memo [Army Com Div OCSigO] for (1) First Draft, Hist of ACS, pp. 231-33. (2)
Gen Stoner, 25 Aug 42. SigC AC-77 Alaska. Rpt 4, Army Com Br OCSigO to Prog and Stat Br,
43
Jackson, Stringing Wire Toward Tokyo, pp. 20 Aug 42. SigC AC 319.1 Digest, 30 Jul 42-1
52-53. Dec. 44.
140 THE SIGNAL CORPS
OPEN-WIRE LINE IN ALASKA. A section of the line between Fairbanks and Big
Delta. A feeder line of the Canol pipeline is discernible parallel to the wire line on the ridge in
the background.
had made a survey of the proposed pole patched over from the telephone line to the
line for the Chief Signal Officer in the sum- radio channel from one station to the next,
mer, was transferred from the Plant Divi- assuring one voice channel regardless of the
sion to take charge of the telephone line condition of the telephone line. The 843d
engineering and to supervise the civilian in- Signal Service Battalion would be organized
spectors who would check the work of the and trained at Fort Lewis, Washington, to
contractors. Capt. Earl A. Burdick would furnish the operating personnel.
assist. Thus in the summer months of 1942 the
Telephone repeater stations were to be plans were laid and the organization assem-
spaced at 100-mile intervals along the high- bled for one of the most spectacular and
way, each at or near a military camp. To imposing communication accomplishments
supplement the telephone line and to pro- of the Signal Corps in World War II. The
vide service if any part of a 100-mile section most modern telephone equipment was
of line should go down under the assaults rushed into an unmapped wilderness, and
of the hazardous winter weather, there the longest open-wire line in the world
would be 125-watt radio stations at each built in the phenomenally short time of
of the telephone repeater stations. In an fifteen months: a feat that in normal times
emergency a circuit could thereby be would have required years of effort. It was
ALASKA COMMUNICATIONS 141
hardly to be expected that so prodigious a fields were stepping stones of the northwest
task, with construction problems com- ferry route, over which aircraft from the
pounded by the time limits imposed, could United States were ferried first to Edmon-
have been accomplished without bickering, ton, Alberta, and then to Fairbanks or
mistakes, and confusion. Ultimate evalua- Nome for delivery to pilots for the USSR.
tion must count the project a brilliant suc- The same air route served the air transport
cess. In its latter phases, the operation moved service, bringing in large quantities of sup-
with remarkable smoothness. But the late plies and men to Alaska.48
summer months of 1942 constituted a period To provide the Corps of Engineers on
of uncertainty, of divided authority, and of the Canol route with communication at
conference table wrangling from one end of their various camp sites, ACS engineers
the continent to the other.46 planned and laid out communication sys-
tems, while soldiers from the 838th Signal
Canol and the Northwest Ferry Route Service Company manned the radio sta-
tions and headquarters center. At some
Technically distinct from the Alcan points, the ACS built short telephone lines.
Highway, but tied to it by geography and By fall 1942, when it was decided to con-
by the total defense plan, were two other tinue operations during the winter, air-
undertakings: the Canol pipeline and the plane landing strips were being planned at
47
northwest ferry route to Alaska. points along the river route, and Signal
The Canol project got under way in the Corps men were busy moving fixed radio
spring of 1942. Plans called for drilling stations to the landing strips, or construct-
wells in the inaccessible oil country near ing telephone lines from the strips to the
Fort Norman on the Mackenzie River, and radio stations.49
for building a pipeline and pumping sta- Meanwhile, in Alaska, the Aleutians, and
tions to deliver the oil to a refinery to be Canada, the Alaska Communication Sys-
erected near Whitehorse, Yukon Territory. tem was completing the engineering, pro-
The gasoline from the refinery would be curement, and installation of important
used to fuel airplanes at the major airfield radio equipment for the Army Airways
at Whitehorse, and at other Canadian and Communication System. By Army regula-
Alaskan fields. From the refinery at White- tions, the Signal Corps was responsible for
horse tank trucks would carry gasoline over providing the equipment, and for installing
the Alcan Highway south to fields at Wat- it, while the Air Corps was responsible for
son Lake, Fort Nelson, and Fort St. John control and operation.50 Although the Sig-
in Canada, and north to Northway, Big nal Corps in the early part of the summer of
Delta, and Fairbanks in Alaska. These air- 1942 had practically relinquished its Army
46
Airways Communications System duties in
First Draft, Hist of ACS, p. 230. Signal Corps'
share of the Alcan Highway development is dis-
other areas to the Air Corps for want of a
cussed further, pp. 481-86, below.
47 48
For a general discussion of the Alcan Highway First Draft, Hist of ACS, pp. 220-29.
49
and Canol projects, see Karl C. Dod, The Corps of Ibid., p. 225.
50
Engineers: The Army Engineers in the War against Hist Br Hq AACS AAF, The Army Airways
Japan, a forthcoming volume in UNITED Communications System, pp. 227-28. Hereafter
STATES ARMY IN WORLD WAR II. cited as Hist of AACS. AF Archives 2690-1.
142 THE SIGNAL CORPS
52
competent field organization, in Canada and west Airlines. In making the Alaskan in-
Alaska it could depend on its experienced stallations, the Air Corps supplied BC—401
engineers within the Alaska Communica- transmitters and receivers. The ACS sup-
tion System. plied antenna material, pole line hardware,
Two nets were planned at first, extending power plants, and other equipment, scrap-
from the panhandle of Alaska out through ing it together from any source possible.
the Aleutians to Umnak. The north net Some items it took from stock on hand,
was to consist of Ladd Field, Fairbanks, others it bought locally and still others, such
WZY; Elmendorf Field, Anchorage, WXZ; as operating positions, it built in the ACS
Gulkana, WXXB; Northway, WYSL; Mc- shop at Seattle.53
Grath, WYSE; Galena, WYSM; and In June, the Alaska Communication
Nome, WYSG. In the south would be Fort System became responsible for the North-
Glenn, WYSI; Fort Randall, WYSH; Nak- west Service Command installations in
nek, WYSD; Bethel, WYSF; Woody Island northwest Canada. By the end of the month,
(Kodiak), WYSK; Elmendorf Field; Cor- the ACS was busy with plans for Army Air-
dova, WYSC; Yakutat, WYZY; Juneau, ways Communications System installations
WYSA; and Annette, WYZF. The north at Aishihik, Whitehorse, Upper Teslin, and
net operated on five frequencies, with four Watson Lake, in the Yukon Territory; Fort
spares; the south on four frequencies and Nelson and Fort St. John, British Colum-
four spares. As new Aleutian and Alaskan bia; Grande Prairie and Edmonton, Al-
stations were activated, they would take berta; and Regina, Saskatchewan. Stations
their places in the south net. About six weeks in the north at Fairbanks and Northway,
after Pearl Harbor, the installations at Alaska, and in the south at Great Falls,
Nome, Bethel, Naknek, Kodiak, Cordova, Montana, were linked in the net by virtue
Cold Bay, Fort Glenn, McGrath, Juneau, of geographic proximity. In most cases,
and Gulkana were authorized. Northway Northwest Airlines either had established or
was added 12 April, and other sites were would build the facilities under commercial
selected subsequently. By the first week in contract, while the Alaska Communication
May, the station at Elmendorf was 75 per- System would furnish additional equipment
cent, and the one at Ladd Field 95 percent, for control towers and weather reporting
complete.51 service.
54
Otter Point. There would be twenty air- to permanent quarters for station attend-
craft warning system radar stations scat- ants, messing facilities installed, and power
tered up and down the rugged coastline of houses erected.
Alaska and the Aleutian Islands. The Satisfactory sites for radar installations
growth of air activity in Alaska soon forced were difficult to find. When the sets were
all the filter centers to become information located at the foot of a hill or mountain,
centers for plotting targets within their re- echoes caused double images to appear on
gions. By midsummer some equipment had the oscilloscopes. When they were located
been installed at all the points named, al- on the summits, echoes rebounded from the
though a full complement of equipment was distant higher mountains. The station at-
not expected to be on hand for many tendants improvised reflectors out of
months.61 chicken wire, and there were other exam-
In the early stages of planning for radar ples of ingenuity. Despite the highly techni-
installations in Alaska, both the Corps of cal equipment, the time never came when
Engineers, which built the access roads, improvisation by men in the field was no
cleared the sites, and prepared the build- longer necessary. Yet by trial and error,
ings, and the Signal Corps, which furnished radar men found that a location similar to
the radars and installed them, were much that selected for the Sitka station was best:
too optimistic. First estimates for the SCR- part way down a hill and on a slope where
271 fixed installations at Sitka and Kodiak beams from the radar would be reflected
had set August 1941 as the probable com- up and away from the station.63
pletion date. Actually, the Chiniak station When radar equipment arrived at its se-
on Kodiak was completed seven months lected location, it was likely to be in poor
behind schedule, on 1 March 1942, and the condition. The SCR-270's and 271's were
Sitka station almost a year late, on 21 July fairly rugged, but nevertheless they consti-
1942.62 It took the Engineers five to ten tuted highly intricate and delicately ad-
months, sometimes a year, to move into a justed mechanisms ill-fitted to withstand
selected site and prepare it for signal instal- the rough handling they had to endure be-
lation and occupancy. Engineer construc- fore reaching Alaskan outposts. In most
tion troops were scarce, and shipping was cases portions of the equipment had to be
not always at hand. To make matters worse, rebuilt or reconditioned. Many parts had
many of the locations were so far north that to be replaced. Often, needed parts were
vessels could land supplies and men only not available, and had to be requisitioned
during a few months out of the year. Sites from depots in the United States. To obtain
for fixed radars were necessarily in wild and
them took from three weeks by air to six
remote spots, requiring access roads to be
months by water for the larger items. At
carved out of the wilderness, dams built to
some locations barges loaded with radar ap-
assure a water supply, camp sites converted
paratus capsized in storms and sank. Even
61
(1) Ltr, O/C ACS to CSigO, 19 Aug 42, sub: on the surviving barges the equipment was
Annual rpt of opns for FY 1942. SigC AC-44. (2) thoroughly soaked by salt water. Radar
Henry Rpt. crews by necessity became very proficient
62
(1) Ltr, O/C ACS to CSigO, Aug 42, sub:
Annual rpt of opns for FY 1942. SigC AC-44. (2)
63
Hist of ACS, Pt. II, "Radar and VHF," p. 32. Henry Rpt.
ALASKA COMMUNICATIONS 145
at making repairs and constructing new material waiting on the docks. High-priority
64
parts from material at hand. items that could be transported by air were
By late summer of 1942, besides the two sometimes crowded into the Army Air
permanent SCR-271 stations at Sitka and Transport Command planes, now making
Chiniak, four temporary mobile SCR-270 regular runs through Edmonton, or into
radars were in service: at Montague Is- the twelve Northwest Airlines planes operat-
land, Cold Bay, Cape Nome, and Fort ing from Great Falls, Montana, to Fair-
Glenn. The installation at Cape Wislow on banks. After supplies arrived at Alaskan
Unalaska Island had been badly damaged ports, there remained the problem of get-
by the Japanese raid on Dutch Harbor in ting them into the interior. Until mid-1943
June, and the parts of the radar set de- most of the water shipments came to Sew-
stroyed in the burning warehouses could not ard, and had to be transshipped by rail to
be replaced before September. A broken Anchorage or Fairbanks. At Anchorage, a
ceramic coil had made the mobile set at 32-foot tide prevented ships from docking
Cape Rodney on the Seward Peninsula in- for longer than six hours at a time. At
operative. Still another mobile set was ready Bethel, St. Michael, and Nome, shallow
for installation at Cape Tanak on the Bering water near shore made it necessary to trans-
Sea side of Umnak Island, and fixed SCR- fer cargoes to lighters for unloading. Some
271's were awaiting installation at Nikolski, supplies sent overland by rail to Prince Ru-
Lazy Bay, Otter Island, and Prominence pert were transferred to barges and towed
on Unalaska Island. Installations planned by tugs through inside water passages to
for seven other locations awaited the allot- Juneau and Skagway. Such circuitous rout-
ment of additional SCR-271 sets which ing and the frequent rehandlings and re-
would not be available until 1943.65 loadings were costly, time-consuming, and
As the war progressed, military planners hard on signal apparatus as well. Civilian
were to find that the strategic situation help was scarce, and inefficient. Wages
changed faster than the rate of progress on were high, and turnover heavy.67
radar construction in Alaska. Many of the All these factors affected the progress rate
proposed stations were canceled before they of communications installations in Alaska.
were completed or even begun, their strate- Nevertheless, as summer faded into autumn,
gic importance having diminished as the
the Signal Corps could point to a very sub-
focal point of warfare moved westward. At
stantial record of achievement in Alaska.
various times until the end of the war,
That it was able to do so much in so short
thirty-four Aircraft Warning Service proj-
a time could be traced to the fact that it
ects were approved; of these, only eleven
66 possessed a seasoned veteran organization in
were completed.
the northwest, the Alaska Communication
Getting equipment to Alaska was a head-
System, as an inspector from Washington
ache. Usually shipments went by water from
pointed out in his report in September.68
Seattle, but there were seldom enough ves-
sels available to relieve the congestion of 67
Henry Rpt.
68
Memo, Col. Walter T. Scott, IGD, for Gen
64
Hist of ACS, Pt. II, "Radar and VHF," p. 34. Stoner, Chief of Army Com Div OCSigO, 11 Sep
65
Henry Rpt. 42, sub: Data for conf, 12 Sep 42, Signal Com in
66
Hist of ACS, Pt. II, "Radar and VHF," p. 33. Alaska. SigC AC-43.
264-211 O - 78 - 11
146 THE SIGNAL CORPS
The Alaska Communication System itself from 282 on 30 June 1941 to 1,011 by 30
bad waxed greatly during the first half-year June 1942. There were 38 officers. The
of war. Its civilian personnel had grown to value of the government traffic handled over
263 by 30 June, although 192 of these were the ACS network had practically doubled:
on duty in the Seattle headquarters, and from $1,207,301.95 in fiscal year 1941 to
only 71 in the field in Alaska. Enlisted men $2,339,710.20 in fiscal year 1942.68
on duty in connection with the operation 69
Ltr, O/C AGS to CSigO, 19 Aug 42, sub:
and maintenance of the system had grown Annual rpt of opns for FY 1942. SigC AC-44.
CHAPTER VI
Losses overseas in men and materiel, in gantic scale on the foundation of the small
bases and prestige, brought Americans the peacetime industrial capacity was stagger-
realization that defense preparations during ing. Testifying before a House of Represent-
recent years had fallen far short of what atives subcommittee, the Chief Signal Offi-
was now needed. The country now under- cer said, "I never dreamed we would have
stood that modern wars could be won only to deal with such sums, but I know you
by men using modern machines, however have to do the job through organization."1
complex and costly. And even as the Signal
Corps shared in the military losses of early The Soaring Signal Corps Budget
1942, it also shared in the vast outpouring
of military appropriations to replenish and The appropriation for the fiscal year 1941
augment the supply of men and equipment. established the pattern for the war period.
When a man has been poverty-stricken It reflected the greatest increase over any-
all his life and unexpectedly has a million previous year yet made. The budget had
dollars dropped in his lap, he is likely to been planned in 1939, starting out with a
be overwhelmed not only by his affluence modest $9,447,439. After five supplemental
but also by the sudden demands, influences, appropriations the sum of $256,652,964
and pressures that he encounters. As with was placed at the Signal Corps' disposal.
men, so it is with organizations. The Signal Since the computation of requirements was
Corps was confronted in 1942 with the so- inextricably involved with budget estimates,
bering yet exhilarating realization that it was each time a change occurred in one, cor-
the supplier of communication equipment
1
for an Army expected ultimately to com- Hearings Before Subcommittee of Committee on
Appropriations, HR, 77th Cong, 2d Sess, On the
prise 8,000,000 men. The very task of ex- 5th Supplemental National Defense Appropriations
panding Signal Corps production on a gi- Bill for 1942, Title I, War Department, pp. 65ff.
148 THE SIGNAL CORPS
responding changes were necessary in the What would it get for its money? For
other. In addition, computation and budget one thing, it hoped to get communications
might be submitted to the various War De- equipment for 33,233 airplanes: radio com-
partment budget and fiscal agencies only passes, command sets, search sets, frequency
to be rejected in whole or in part. When meters, receivers for marker beacons, inter-
that happened, the budget estimates and phone equipment, and all the other compli-
computation of requirements had to be re- cated and expensive radio and radar items
figured and resubmitted. During the fiscal that go to make up the eyes and ears and
year 1941 thirty different budgets had been nervous systems of airplanes. For another,
submitted. They reflected the rapid accelera- it would spend an enormous sum for air-
tion of prewar planning, with funds for craft warning service to buy the radars to
radar, airplane communication, aircraft ring the shores of the nation and its terri-
warning service, and troop equipment for torial possessions, and to train the men to
the expanding Army looming large. For the operate the radars. It would buy radios for
fiscal year 1942 Signal Corps fiscal experts tanks; it would build handie-talkies for foot
had started working in early February 1941, soldiers; it would pay salaries for the thou-
and the budget had been sent to Congress sands of civilian workers thronging into its
in May. The original budget contained offices and depots and warehouses. It would
twenty-seven projects, and totaled $103,- get millions of miles of wire, hundreds of
577,000. Before it was passed by Congress thousands of batteries, and thousands of
and signed by the President, three additions cameras.3
had been made which amounted to twice as Throughout the period June 1940 to 7
much as the whole of the original budget. December 1941, the Army had computed
In the succeeding months of 1941, while its requirements according to the exigencies
world events moved rapidly, the public of the moment and to the limit of funds
funds that had been so lacking in the lean that could be secured from Congress.
years just past poured into the War Depart- Within the Office of the Chief Signal Offi-
ment in greater and greater amounts. Be- cer the representatives of the using arms
fore war struck, the Signal Corps had bene- prepared lists of signal supplies and equip-
fited by two supplemental appropriations. ment to meet their own needs and for-
Now, in the closing months of fiscal year warded these lists to the Supply Division.
1942, all budget estimates prepared for use The Procurement Planning Section of the
"in case of war" had been swallowed up by division had been busy with almost com-
the enormous demands of war itself. In a pletely theoretical computations, arising
single suppplemental appropriation in from troop basis tables as they varied from
March, the Signal Corps passed a historic year to year, and with studies looking to-
milestone when it received its first billion- ward the most effective use of industry in
dollar grant of funds. Before the fiscal year an emergency.4 The birth of the Army Sup-
ended it would have for expenditure several ply Program in February 1942 heralded a
2
times that sum. new kind of computation, based upon the
2
Andre E. Gerard, The Story of Supply in the
3
Signal Corps in World War II, Pt. I, Requirements, Ibid., p. 106.
4
SigC historical monograph B-l, pp. 16-26, 28, 30. See Terrett, The Emergency, pp. 58-69, 166-78,
SigC Hist Sec File. 240-50.
THE FIRST BILLION DOLLAR SIGNAL CORPS 149
requirements for a three-year period, 1942- with him on 17 January.5 He asked the
1944, and expressed in the broadest terms, Under Secretary of War to address the
with no attention given to the problems of meeting, and suggested that he mention
delivery, and no differentiation between "the necessity of bettering . . . stated de-
types of equipment within a larger group. livery dates; the importance of blasting out
On that basis, the Signal Corps job looked bottlenecks in production; the advantages
even bigger than it had a few weeks before. of ... sending representatives to accom-
plish the same results with sub-contractors,"
Basic Organization and Policies and asked him to bring up the subject of
further curtailment of the manufacture of
As responsibilities and activities in- radio sets for civilian use.6
creased, the staff to handle them began to The Big Five held more than 80 percent
materialize. By March more and more re- of all Signal Corps contracts. As of March
serve officers were reporting for duty, and 1942 the Signal Corps estimated that the
on-the-job training together with intensified military services would have $4,350,000,-
recruiting efforts was providing engineers, 000 available for contract awards in the
technicians, and clerical workers to aug- fields of radio and radar. Yet the total in-
ment the civilian staff. Within the Office of dustrial output of the industry was only
7
the Chief Signal Officer, the framework of $250,000,000. What was the best way to
the Supply Service embraced the two divi- solve the problems of plant expansion, scar-
sions, Radar and Materiel, responsible for city of machine tools, shortage of labor sup-
the Siamese-twin nature of procurement ply, inspection, spare parts, stock control,
and research and development. General packaging, financing, critical materials, and
Olmstead had sought to trim the fat from a thousand other factors? Olmstead said
that he expected the large industries to co-
the procurement function, and to leave it
operate and to make their own plans for a
as lean and fit as possible. That it could
solution of the problems; if they did not,
not run as fast as the research and develop-
the government would take whatever action
ment function to which it was shackled was
was necessary.
largely due to the fact that procurement
The policy of the Signal Corps, he said
was inextricably bound to the communica-
to Lt. Gen. William S. Knudsen at about
tions industry, which for the greater part
the same time, was to spread the work and
meant five large companies.
5
Olmstead had invited the presidents of Memo, Col Colton, Chief of Materiel Br, For
All Concerned, 16 Jan 42. SigC 337 (Gen) Confs
the Big Five (General Electric, Western 4, Jan-Jun 42.
Electric, the Radio Corporation of America, 6
Memo, Olmstead for USW, 13 Jan 42. SigC
Westinghouse, and Bendix), as well as Maj. 337 (Gen) Confs 4, Jan-Jun 42.
7
(1) Gerard, Story of Supply in the Signal Corps,
Gen. Richard C. Moore, Deputy Chief of Pt. II, Procurement, SigC historical monograph
Staff, James L. Fly, chairman of the De- B-lb, pp. 11-12. Figures are from the Bureau of
Census compilation, Census of Manufacturers,
fense Communications Commission, Ray C. Electrical Industry Division, 1939, with estimated
Ellis of the Office of Production Manage- increase to end of calendar year 1941. (2) Civ
Prod Adm, Official Munitions Production of the
ment, and Wallace Clark, who headed his United States, 1 July 1940—31 August 1945 (1
firm of administrative consultants, to meet May 4 7 ) , Chart XI, p. 373.
150 THE SIGNAL CORPS
10
money throughout big and little companies. ities and trained workers to the industry.
Olmstead wanted "no monopolistic aspect Even had it been considered wise in the light
whatever." Knudsen replied: "If you keep of these considerations to forbid the manu-
on giving them more and more you will be facture of civilian items of electronic equip-
nearly monopolistic before you get through." ment, the Chief Signal Officer lacked
Olmstead explained that Signal Corps con- authority, as did the Secretary of War, to
tracts provided that 30 to 40 percent must force any manufacturer to produce only
be subcontracted. That put the burden on military equipment. On 16 January 1942
the big companies to develop their own the President created the War Production
sources of supply.8 Board and centralized control of procure-
This was more easily said than done. ment and production in its chairman,
While accepting the idea of subcontracting Donald Nelson. The chief of WPB's Radio
and building up new sources of supply, the Division, Ray Ellis, was also a member
big companies were at the same time oppos- of Brig. Gen. Roger B. Colton's Signal
ing undue regimentation within the war- Corps procurement committee. As soon
economy framework made necessary by the as Ellis and Colton deemed it advisable,
exigencies of the conflict.9 Meanwhile, the the WPB began issuing a series of limi-
smaller companies, freed from the compe- tation orders to the radio industry. On 23
tition of the Big Five, which had thereto- January 1942 it issued Limitation Order
fore controlled the market, were harvest- L-44, which cut radio manufacturers to 55
ing the windfall created by civilian de- percent of their 1941 volume of commercial
mands. The component situation became production. In March the War Production
tighter, and threatened shortages of criti- Board amended the order, prohibiting all
cal materials developed into a grim reality, production of commercial radios and phono-
while production of radios, phonographs, graphs. In May it went still further, issuing
and musical instruments ate up the same Order L-37-A, which stopped manufac-
critical materials that signal equipment ture of practically all musical instruments.11
required. The limitation orders in effect constituted
Nevertheless, it was impractical if not im- an ultimatum to the electronics industry to
possible to stop all production of civilian turn to military production or face the pos-
radios and related equipment at once upon sibility of closing its factories. Of necessity
the outbreak of war. It took time to place the industry began converting to military
contracts, to educate smaller companies for production. Yet the elimination of commer-
war work, and to bring about conversion to cial production of items which consumed
wartime manufacturing in an orderly man- critical materials, though helpful, was a
ner. Any drastic order immediately forbid- palliative rather than a curative measure, of
ding the manufacture of civilian radio value chiefly in that it granted the govern-
equipment would merely have forced manu- ment and industry a little time to get at the
facturers out of business or into some other
10
line of work, with a consequent loss of facil- Ms Comment by Maj Gen Roger B. Colton,
USA,
11
Ret, 14 Sep 53.
8
Office Dir of Prod WD, Meeting to Review (1) Everitt et al., Industrial Summary: Signal
SigC Program, 22 Jan 42. SigC EO 337 Confs. Corps Procurement of Radio and Radar Equip-
9
Gerard, Story of Supply in the Signal Corps, ment, pp. 25-26. SigC Hist Sec File. (2) MS Com-
Pt. II, App. IV. ment by Colton, 14 Sep 53.
THE FIRST BILLION DOLLAR SIGNAL CORPS 151
root of the problem. The root was a dual began reorganizing all its special studies in
shortage: of essential raw materials, and of an intensive effort to establish maximum ca-
manufacturing facilities for converting the pacities in existing facilities, to discover new
raw materials into electronic equipment. sources of supply, and to unearth substitutes
Solution depended upon careful co-ordi- for materials no longer available. Through-
nation of the requirements of the various out the spring of 1942, the Signal Corps and
contractors and scrupulous allocation of industry attacked bottlenecks, reducing them
scarce materials and the components made at least, and sometimes eliminating them
13
from them, as well as upon assistance to entirely.
potential manufacturers in establishing
themselves. The big companies and the Sig- Facilities Expansion and the
nal Corps tackled the problems together. Problem of Components
Although eventually many smaller concerns
developed into valuable sources of supply, At first, the subcontracting programs of
throughout the war the ultimate responsi- the big companies usually involved major
bility for supplying electronic equipment re- components, the subcontractors supplying
mained with the giants of the industry. The the constituent parts of radio sets and other
policy enunciated by General Olmstead in signal assemblies, and the prime contrac-
June 1942 remained the official policy. He tors performing the assembly and shipping
stated: the items of equipment from their own
plants. At a later period the work was spread
The Signal Corps has placed the bulk of
its business with a small number of large still further by subcontracting for complete
14
companies. At the beginning of the present assemblies. But in the spring of 1942, most
emergency the large companies were "going of the subcontracting was for components,
concerns" with large resources in engineering and the supply situation for these parts was
ability, plant equipment, and skill in produc- unequivocally bad.
ing communication and radar equipment.
Other firms were not able to take large orders, To begin with, components were of infi-
and required time and assistance in expand- nite variety. Such commonplace items as
ing engineering staffs and training them in screws and bolts were components. So were
the type of production required. It has been dynamotors, essential to vehicular radios. So
the policy of my office to place large con-
tracts with the large firms and [to] require were the slivers of quartz crystal used to con-
them to subcontract approximately 40 per- trol frequencies and the steatite ceramic
cent to the smaller firms. This permitted the coils vital to high frequency sets. So too were
utilization of the resources of the large firms
in training the smaller firms. This policy was vacuum tubes, dry cell batteries, ball bear-
approved by the Under Secretary of War and 13
the Office of Production Management.12 For details, consult the weekly branch progress
reports. From 1 January 1942 through 16 Septem-
Within the Signal Corps supply head- ber 1942, these reports are contained in a series of
quarters a great deal more work devolved files titled Weekly Achievement Reports, located in
upon the Facilities and Materials Branch, the Signal Corps Central Files. From 23 September
1942 through 1943, the files are titled Digest of
which absorbed some of the functions of Progress. Regardless of the file wrapper title, the
the old Procurement Planning Section and individual branch reports are called Weekly Digest
of Progress and Problems.
12 14
Supply Sv OCSigO, Review of Prod Plans, 18 Everitt et al., Industrial Summary: Signal Corps
Jun 42. SigC DS 337. Procurement of Radio and Radar Equipment, p. 26.
152 THE SIGNAL CORPS
ings, telephone cords. These added up to 45 government-financed expansions involv-
just a few of the items that were actually ing 35 companies and the sum of $45,000,-
holding back or threatening to hold back 000 were under way,17 and in addition the
production of Signal Corps equipment electronics industry itself was expending
either because ingredients were scarce or sizable amounts of money to enlarge its
because manufacture was difficult and on factories. Of the plant expansions that the
15
an inadequate scale. Signal Corps initiated during the entire war,
The procurement staff, in somewhat be- 80 out of a total of 106 were for compo-
lated recognition of the seriousness of the nents. In the early months of 1942 the items
shortages, was taking action, but for some for which plant expansions were recom-
time made slow headway. Until production mended included tubes, stop nuts, dyna-
schedules suddenly began to be held up be- motors, steatite, quartz crystals, conductors,
cause of shortages of such items as fixed coils, capacitors, cordage, and transformers.
capacitors, ceramic coils, dynamotors, As a matter of fact, a Signal Corps sup-
meters, batteries, and even certain types of ply officer stated at a later date that in the
cord, the Signal Corps, relying upon per- early months of the war, the Signal Corps
formance specifications and the opinion of had tended to rush into expansion at every
its prime contractors, had assumed that the report of an existing shortage, without
components industry would be equal to any much understanding of the relationship be-
emergency. Even as late as 13 January 1942 tween requirements and capacity.18 In any
prime contractors for radio, meeting with event, lack of plant capacity was only one
representatives of the supply arms, had part of the problem. Another part of it con-
agreed that, with the possible exception of cerned the lack of co-ordinated procure-
the variable capacitor industry, component ment among the supplying arms and serv-
producers could meet wartime demands ices. By February it had become apparent
with their existing plant capacity. This con- that mass production of many radio and
ference had scarcely adjourned before mili- other electronic components required by the
tary radios began to stall on the assembly Signal Corps, the Air Corps, and the Navy
16
line for lack of components. was impossible if each of the organizations
One approach to the problem of secur- persisted in procuring these items under its
ing more was to increase plant facilities pro- own specifications. All government specifi-
ducing them. Even before Pearl Harbor cations required optimum performance in
more than $15,000,000 in plant expansions components, a considerably higher stand-
had been sponsored by the Signal Corps ard than that ordinarily required for com-
through Defense Plant Corporation funds, mercial production. In addition, there was
although only one plant, producing steatite, enough variation in the specifications of the
had made much headway. By Tune 1942 17
(1) Memo, Exec Officer Mat Br OCSigO for
15
Unless otherwise indicated, the source of in- Exec Control Div, 5 Jun 42, p. 6, Item 3. Weekly
formation on components is W. P. Worrell (Prod Achievement Rpt, 27 Apr-8 Jun 42. SigC Central
Div, Philadelphia SigC Proc Dist), Industrial Sum- Files. (2) CSigO Annual Report, 1942, pp. 20, 92.
mary: Signal Corps Materials and Resources, 31 Jan (3) Gerard, Story of Supply in the Signal Corps,
46. SigC Hist Sec File. Pt III, Production, SigC historical monograph B-lc,
16
Lanier Gray, Industrial Summary: Signal p. 25.
18
Corps Procurement of Selected Components, 7 Rpt of SigC Prod Conf, 12 Dec. 42. SigC
Jan 46, pp. 1-3. SigC Hist Sec File. MB-Miscellaneous Folder 2.
THE FIRST BILLION DOLLAR SIGNAL CORPS 153
three military agencies to limit sources of Corps needed meters at the rate of 40,000
manufacture. For instance, a manufacturer a month, the Air Forces at 4,500 a month,
able to make satisfactory resistors for the and the Navy at only 10,000 a year. The
Signal Corps might be unable to make them representatives were able to work out an
for the Navy. As is the case in most other equitable allocation of existing facilities,
classes of industries, one or two firms and thereafter each service got what it
21
known for the high quality of their prod- needed without difficulty.
ucts soon became overloaded with orders, Still another basic element in the com-
while other companies were soliciting busi- plex problem of providing enough compo-
ness to keep their organizations intact.19 nents (and therefore enough signal assem-
To simplify specifications and make them blies) was the lack of detailed knowledge
uniform throughout the procuring services, on the part of both the Signal Corps and
the War Production Board asked the Amer- the principal contractors as to what raw
ican Standards Association, a federation of materials would be required, and in what
some eighty national technical societies, quantities. It was necessary to learn pre-
trade associations, and government agen- cisely what components comprised each as-
cies, to work with the services to achieve sembled unit of equipment, what the in-
standardizations. In response, the Ameri- gredients of each component were, and how
can Standards Association organized the much of each ingredient every type of com-
War Committee on Radio in early March, ponent required. Then, given the over-all
with Maj. William M. Perkins representing equipment requirements as estimated from
the Signal Corps, and the committee began troop tables and tables of basic allowances,
its important work of developing war stand- statisticians could compute the amount of
ards for the critical components, observing raw material which industry needed to
the following priority: fixed capacitors, meet the requirements of the armed forces.
fixed resistors, variable resistors, connectors, The previous year a group of six engi-
dynamotors, tube sockets, crystals and neers and a number of clerks in the New
holders, vibrators, and dry batteries.20 York Procurement District had begun the
In some cases competition among the work of making material breakdowns of all
Navy, the Air Forces, and the Signal Corps components of Signal Corps equipment and
for scarce facilities held back deliveries of compiling lists that showed not only the
components. An early case developed quantity of raw materials per item, but also
around the procurement of meters. The size, shape, quality, and grade of materials.
Signal Corps suggested that representatives This group had transferred to Philadelphia
of the three services get together and com- shortly before the United States entered the
war, and in early 1942, when the compo-
pare requirements and work out a solution.
nent shortages developed, it acquired four
They did so, and discovered that the Signal
more engineers and additional clerical help.
19
Everitt et al., Industrial Summary: Signal It was slow work, exacting work, and the
Corps Procurement of Radio and Radar Equip- engineers who pioneered it had to get their
ment, p. 30.
20
Capt Charles R. Novick, The Signal Corps information for the breakdowns as best they
Policy of the Conservation of Critical and Strategic
21
Materials (1945), SigC historical monograph B-16, Interv, SigC Hist Sec with Col Elder, Asst
pp. 44-47. SigC Hist Sec File. Chief of P&D Div OCSigO, 28 Sep 49.
154 THE SIGNAL CORPS
could and in a variety of ways: from speci- gun to vex all government procurement
22
fications and drawings, by examining and agencies and producers of war materiel.
taking apart the equipment itself, by check- Whether shortages were "strategic," or
ing with co-operative manufacturers, and "critical," the result was the same: chok-
by going directly to the factories. They de- ing of production because the material to
23
veloped detailed notes on their findings and make equipment was not at hand. In
compiled these carefully, gradually amass- either case, one of two things could be
ing an enormous bulk of exceedingly valu- done: endeavor to do away with use of the
able information. material, or failing in that, find or develop
While the group in Philadelphia com- substitutes for it. This was the story in the
case of copper, mica, rubber, cadmium,
piled statistics about the components, pro-
aluminum, and many other raw materials.24
curement officers in all the districts were
The problem of the Signal Corps with
surveying the factories that produced them, respect to material shortages was in some
building a substantial library of factual in- instances no more and no less than that of
formation about the financial status, ma- the other supply services; in other cases, be-
chinery, labor, quality of work, and capac- cause of the peculiar nature of communi-
ity of existing plants. Until it had acquired cation equipment, and the vital part com-
this information, the Signal Corps had no munications play in modern warfare, the
sound basis for determining which plants shortages represented a deadly threat to the
merited government-financed expansion or whole procurement program, and through
which could convert from civilian to mili- it to the security of the nation. Throughout
tary production after only minor changes. the war, material shortages plagued the Sig-
Once it had this basis, its interest and spon- nal Corps procurement program. Eventu-
sorship began to reach behind the subcon- ally, through simplification, standardi-
tractor and his plant to plants where raw zation of components, redesigning of equip-
materials were processed, and behind those ment, downgrading, substitution, and the
to the mining companies. If the Signal use of synthetic materials, the Signal Corps
Corps happened to be the principal con- overcame its material shortages. But the go-
sumer of a scarce raw material, it sponsored ing was neither smooth nor easy, and in
the necessary expansion of mining and early 1942 the Signal Corps was not yet
processing facilities, as in the case of quartz sure where the path led.
crystal, steatite, and tantalum. In the case Tantalum
of materials which the Signal Corps had to
have but used in smaller quantities than One of the more discouraging problems
some other service, the Signal Corps pre- concerned the tantalum shortage. The first
sented its requirements to higher authority 22
Terrett, The Emergency, pp. 244ff.
and let the procurement agency that was 23
Strategic shortages were usually defined as
the heaviest consumer assume responsibility those resulting from the cutting off of foreign sup-
ply sources by the declaration of war and critical
for the necessary expansion. shortages as those arising from insufficient domestic
production.
24
Material Shortages Ltr, Gen Dev Div OCSigO to Dir of SCGDL,
12 Feb 42, sub: Program for reduction of SigC
rqmts for strategic materials. SigC 410.2 Alumi-
When the United States entered the war, num. See also other folders in Signal Corps 410.2
scarcities of raw materials had already be- series for specific materials.
THE FIRST BILLION DOLLAR SIGNAL CORPS 155
substantial requirements for tantalum had tations and recomputations of tantalum re-
developed in the fall of 1941 with the in- quirements. In March, just as the planners
creasing production of radar. Oscillator, were breathing more easily, another crisis
keyer, and rectifier tubes of the SCR-268 all loomed. The Joint Army and Navy Mu-
required tantalum sheet or wire, and the nitions Board announced that a considerable
short life of the tubes created a heavy de- quantity of potassium tantalum fluoride, an
mand for spares. Early versions of the SCR- intermediate material between the ore and
299 and SCR-399 used tantalum plates and the pure metal, would be required as a cat-
grids in their power-amplifiers and modu- alyst in the production of butadiene, the
lator tubes, and each new development synthetic rubber.
created new demands. A survey of the in- As in most war shortages, there was no
dustry conducted by the Planning Section single easy and dramatic solution but a com-
had revealed that there were only two pro- bination of several: plant expansion; strict
ducers of tantalum in the world. One of allocation of tantalum and tantalum fluo-
them, Siemens-Halske, was in Berlin; the ride; substitution of less critical materials;
other, Fansteel Metallurgical Corporation, and, to a lesser degree, salvage of tantalum
was in North Chicago. Fansteel agreed to in unserviceable tubes. A year later, in 1943,
expand, but was very slow to act. It was not another crucial shortage occurred, when in
until the last day of January 1942 that ar- the midst of peak production the ore supply
rangements were concluded for the estab- sank to dangerously low levels. Then came a
lishment of a new unit adjacent to the call upon the Air Transport Command and
existing Fansteel plant in North Chicago; the Naval Air Transport Service to fly ship-
the lease agreement, signed by the Defense ments of ore from South Africa and the
Plant Corporation, set the total project cost Belgian Congo to meet the situation. But in
at $4,170,000. The expansion provided a the first half of 1942 that problem was still
capacity of about 100,000 pounds of tan- in the future and the ones at hand were
talum metal per year, the maximum per- enough to wrestle with.26
mitted by the available quantity of ore.25
This quantity appeared to be enough, al- Rubber
though the very best estimates of require- The rubber situation was a major source
ments were likely to be inaccurate because of worry to the military organization. There
there were no material breakdowns on elec- were too many questions that only time
tron tubes available, and in addition no could answer. Japanese successes had cut
one could say just how many tubes or what off the principal supply of natural rubber.
types would be needed. The Facilities and Wild rubber trees in South and Central
Materials Division of the Office of the Chief America constituted a sure but very lim-
Signal Officer and the War Production
ited source. The United States was begin-
Board were constantly engaged in compu-
ning to get plantation rubber from Liberia,
25
(1) Ltr, Gen Dev Div OCSigO to Dir of but shipping lanes to that country were sub-
SCGDL, 26 Jan 42, sub and file cited n. 24. (2) ject to attack by German submarines. Large-
I. D. Adams (Prod Div Philadelphia SigC Proc
Dist), Industrial Summary: Signal Corps Pro-
scale production of synthetics was supposed
curement of Tantalum, Tungsten and Molybdenum,
26
18 Feb 46, pp. 16-19. SigC Hist Sec File. Adams Summary, cited n. 2 5 ( 2 ) , pp. 15-19.
156 THE SIGNAL CORPS
to begin in early 1943, but if there were de- and development men also made flat pro-
lays or unforeseen difficulties in manufac- nouncement that they could not at that
ture, synthetics could not meet the enor- time eliminate latex from meteorological
mous demand. In the meantime conserva- balloons because use of a substitute de-
tion was the only solution. manded a complete revision of the existing
In January, a month before the fall of ascension-rate tables used in meteorologi-
Singapore, General Olmstead had been cal work.28
requested by Under Secretary of War Pat- Nevertheless, substitutions must be made
terson to review again Signal Corps re- and conservation practised. According to
quirements for rubber "with a view to the soberest estimates of the military supply
elimination or reduction of its use wherever organization and of the Office of Produc-
possible to do so without adversely affect- tion Management, the nation was going to
ing the functioning of equipment," and to run short of rubber and rubber substitutes
submit the report by 20 January. 27 to the amount of 266,000 long tons within
Because of the complexity and delicacy the next two years. Other services were able
of its equipment, the Signal Corps was to substitute less critical materials in many
probably faced with a knottier problem instances: for example, steel wheels for
than were other services in attempting to rubber on certain engineering equipment,
change the amount of rubber it used, or in such as concrete mixers and portable air
shifting from natural rubber to synthetics. compressors, and plastics for rubber in en-
Manufacturers were experimenting with listed men's combs. Rubber boots could
insulation and jackets made of various serve their purpose if made with 47 percent
elastomers that were beginning to be avail- rather than 62 percent rubber; it was pos-
able, but, it was pointed out, ". . . No sible that tank tracks could be made of
synthetic . . . possesses as desirable . . . metal instead of rubber.29
characteristics ... as rubber. Synthetic But the Signal Corps was left with the
insulated wires usually have been designed fact that its most important field wire re-
to excel for a special application [only]. quired rubber, that no known synthetic
. . . " Lowering the rubber content of in- could substitute, and that the new light-
sulation for W-110-B would conserve rub- weight assault wire W-130 offered almost
ber and result in a better product than any as troubling a problem. Laboratory tests
synthetic yet tried could yield. Technicians with insulation made of plasticized vinylite
of the Signal Corps Laboratories had
resin or a latex made from neoprene or
pointed out that vinyl or other suitable
thermoplastics would probably be satisfac- 28
(1) Incl, Substitution of Synthetics for Rubber,
tory for telephone communication over dis- with OCSigO R&W Action 1, Proc Plan Sec
tances required for assault wire W-130, but (L. H. H.), to O/C Proc Plan Sec, 14 Jan 42, sub:
Rubber substitutes; (2) Msg, SigC Labs, Ft. Mon-
added that there was no known substitute mouth, to OCSigO, 16 Jan 42; (3) OCSigO R&W
for rubber for twisted pair over distances Action 1, Proc Plan Sec to O/C, 16 Jan 42, sub:
Rubber latex. SigC FM 381.3 (PP) Rubber and
required for wire W-110-B. The research Rubber Goods, No 2, Drawer 663.
29
Erna Risch, The Quartermaster Corps: Organ-
27
Memo, USW for CSigO, 12 Jan 42. SigC FM ization, Supply, and Services, I, UNITED STATES
381.3 (PP) Rubber and Rubber Goods, No. 2, ARMY IN WORLD WAR II (Washington, 1953),
Drawer 663. 66-68.
THE FIRST BILLION DOLLAR SIGNAL CORPS 157
buna gave satisfactory results on W-130, at least a year before there would be enough
but these substitutes could not be applied of it, particularly since cables insulated with
with the same machinery that produced the material had to be replaced every six
natural latex coating. Government-financed months. So while the Du Pont engineers
units for applying liquid latex had barely went to England, the Signal Corps searched
come into production, and any change to for a substitute for polythene.31
substitutes which had to be applied by the The most promising appeared to be a ma-
extrusion process would mean different ma- terial called Vistanex, a rubberlike product
chinery. In view of the existing machine made entirely from petroleum. During the
tools shortage, such a change would create winter, five wire and cable companies had
a delay of from six months to a year in the produced samples of cables insulated with
delivery of the wire.30 Standard Oil Company's Vistanex com-
Finding rubber substitutes for cable insu- pounded with filling ingredients. The Naval
lation also presented difficulties. In 1941 Research Laboratory, to which the samples
when radar production began to mount, the had been submitted for testing, had found
Signal Corps had begun what was to be a that three of the companies, American
protracted search for a suitable dielectric Phenolic Corporation, General Electric, and
for insulation of the ultrahigh-frequency Simplex Wire and Cable Company, had
cable required in great quantities for air- developed a Vistanex base compound which
craft radar installations. There was not met the Navy's tentative specifications for
enough rubber to permit its use, and both ultrahigh-frequency cable. Other American
the Navy and Signal Corps were trying to manufacturers experimented with other
find a satisfactory synthetic that would be cable insulating materials. In February,
available in sufficient quantity. when the Du Pont engineers returned to the
A British firm had been making a satis- United States with their report, officers and
factory material, known as polythene or civilian engineers from the Office of the
telcothene, but there were no existing facili- Chief Signal Officer and from the Bureau
ties for its manufacture in the United of Ships and Office of the Chief of Naval
States, and the British were not making Operations met with representatives of the
enough for even their own needs. Since the War Production Board to decide which
Du Pont Company had been licensed to type of insulation to use on cable. The Du
manufacture polythene under the British Pont engineers' report on polythene was
patents and had some knowledge of the discouraging. That the British would pro-
processes involved, it offered to send some duce their own quota of 700 tons in 1942
of its engineers to England to study the Brit- was highly problematical. Serious difficulties
ish method of production. Even if Du Pont
of manufacturing technique showed that it
succeeded in making polythene, it would be
would be impractical to attempt quantity
30
(1) OCSigO R&W Action 1, R&D Div to production of polythene in the United States
Proc Plan Sec, 22 Jan 42, sub: Rpt of Confs on
the conservation of rubber and aluminum held 16
by the English process in any reasonable
Jan 42 in OUSW. (2) WD Bureau of Public Re-
31
lations, Press Release 901, 29 Jan 42. (3) Memo, L. H. Drake and F. W. Thomas, Philadelphia
Col Cuny, OCSigO, for USW, 20 Jan 42, sub: SigC Proc Dist, Industrial Summary: Signal Corps
Conservation of rubber. SigC FM 381.3 ( P P ) Procurement of Wire and Cable, 1 Jun 46, Supple-
Rubber and Rubber Goods, No. 2, Drawer 663. ment 1, p. 20, SigC Hist Sec File.
158 THE SIGNAL CORPS
time. Du Pont hoped to be able to work out The difficulties of the Signal Corps in its
a better method of manufacture in time, attempt to bring field wire and cable into
but it was clear that this source of insulation the rubber conservation program brought
for ultrahigh-frequency cables could not be about an important conference in the Of-
depended upon for the immediate future. fice of the Chief Signal Officer on 11 Feb-
That left the Vistanex compounds. ruary 1942. The chairman was Col. Byron
Standard Oil Company's Bayway Plant, the A. Falk, a Signal Corps representative in
only producer of the material in the coun- the Office of the Under Secretary of War.
try, was turning out no more than 45 tons Officers and engineers from the Procure-
a month. A new plant under construction ment and Research and Development Di-
would not be in production until early visions of the Signal Corps, and from the
1943. The War Production Board had al- Monmouth laboratories met with the prin-
ready allocated the current production, cipal manufacturers of wire, cable, rubber
keeping 30 of the 45 tons for domestic con- goods, and synthetic rubbers to attempt to
sumption; the remaining 15 tons were find a solution. How could the Signal Corps
allocated to the British and Russians by conserve rubber in wire insulation without
executive order to provide a fractional part worsening the performance of the wire? The
of what they needed. The Signal Corps had conferees agreed that for immediate conser-
an allocation of only five tons monthly for vation, the best plan was to reduce the per-
wire and cable, and this calculation had not centage of new rubber used in W—110—B
provided for ultrahigh-frequency cable insulation, and substitute reclaimed rubber.
since the supply organization had counted For the long-range program, they discussed
rather heavily on the ability of Du Pont to ways of eliminating rubber entirely and sub-
produce polythene. stituting synthetic compounds. It was ob-
The conferees thus reached the sticking vious that more experimental work in the
point of the meeting: how were the Army use of synthetics was in order. The most re-
and the Navy to get the 500 tons of suitable cent field tests with assault wire insulated
synthetic for the 1942 production of ultra- with vinyl resin plastic had been unsatisfac-
high-frequency cable? Before the close of tory : the wire had been difficult to handle,
the conference everyone agreed that the would not lie flat on the ground, and was
cable should have first priority on Vistanex; hard to splice. Most of the suggestions for
that the Joint Army and Navy Munitions varying the amount of rubber used also in-
Board should ask the Reconstruction Fi- volved some change in manufacturing meth-
nance Corporation to acquire a 500-ton ods which would slow down production.
stockpile of Vistanex and reallocate it to tained by all sections of the Procurement Division,
the wire and cable companies for manufac- OCSigO; all bear the Dewey classification number
ture of the ultrahigh-frequency cable; and 314.7. Folders referred to in this chapter are: Proc
Div, O/C, 1 Dec 41-31 Jan 42; Proc Div, Prod
that Du Pont's neoprene, a special-purpose Exped Sec, 1 Nov 41-2 Jan 42, 1 Jan 42-16 Feb
rubber, should be used as a substitute for 42, 29 Mar 42-30 Apr 42, 5 May 41-21 May 42;
the items on the original allocation Proc Div, Proc Plan Sec, 1 Nov 41-15 Feb 42,
1 Jan 42-4 Apr 42; Proc Div, Pur Sec, 16 Nov
schedule.32 41-30 Jan 42, 1 Feb 42-12 Oct 42, 1 May 42-21
May 42; Inspec Sec, 15 Oct 41-28 Feb 42. Here-
32
OCSigO Proc Div, Proc Plan Sec, Daily Hist after these will be referred to as Daily Data (with
Data, 6 Feb 42. SigC 314.7. Data sheets were main- appropriate section and date of report).
THE FIRST BILLION DOLLAR SIGNAL CORPS 159
Nearly all of the wire and cable manu- The general development engineers favored
facturers thought they could use reclaimed the proposal, but the facilities and mate-
stock to replace a part of the new rubber, rials men feared that some of the manufac-
and calculated the quantities of natural rub- turers lacked the technical ability as well as
ber used by their firms per mile of W—110— the necessary equipment to operate under the
34
B, ranging from 18 to 22 pounds. A ques- 18-pound limitation.
tionnaire sent out to the companies after Although wire and cable did not yield
the meeting brought more detailed state- easily to conservation requirements, there
ments and disclosed the fact that none of were other types of Signal Corps equipment
the companies had used any synthetic rub- that proved more amenable to change.
ber at all, that only one had used any "re- Parking wheels on trailers did not need rub-
claim," and that the variation in amount ber tires, and neither did reel cart wheels.
of crude rubber used (from 14.75 to 22 Engineers estimated that nearly 5,000
pounds) suggested that some manufactur- pounds of rubber could be saved on these
ers were trying harder than others to con- two pieces of equipment alone during the
serve the material. Western Electric, the fiscal year 1943. Because radar equipment
most economical user of new rubber in the was delicate and extremely intricate, and
manufacture of cable, had offered to share because the vehicles on which the sets were
its compounding information with its rivals. mounted were expected to maintain the
Uneasily, the Signal Corps considered speed of antiaircraft guns on the move, both
limiting the amount of rubber per twisted- laboratory and staff specialists recom-
pair mile. It had already revised specifica- mended against trying anything other than
tions to permit 30 percent depreciation of rubber tires for these vehicles. By various
physical properties of the insulation through
means the Signal Corps conserved 255 tons
aging; the standard had been 25 percent.
of crude rubber in 1942. These savings mul-
A field engineer thought that the consump- 35
tion of crude rubber could be reduced con- tiplied in 1943, reaching 3,500 tons.
siderably by proper compounding, but
warned that until the Signal Corps estab- Crystal Quartz
lished a maximum weight of rubber per The basic decision to adopt crystal con-
mile, most of the manufacturers would con- trol for vehicular radio had been firmly
tinue in the old pattern. He recommended established late in 1940.36 The program for
immediate limitation of the amount to 18
pounds of crude rubber per mile, and in 34
OCSigO R&W Action 1, Gen Dev Div to Proc
sixty days a further reduction to 15 pounds, Plan Sec Proc Div, 7 Apr 42, sub: Rubber Con-
serv in wire W-110-B; Action 2, Fac and Mat Div
about what Western Electric was using.33 to Gen Dev Div, 14 Apr 42. SigC FM: Rubber
Conservation 1942.
33 35
Memo for File, Byron S. Anderson, SigC Fld (1) Msg, SigC Labs, Ft. Monmouth, to
Lab No. 2, Eatontown, N. J., 1 Apr 42, sub: Rec- OCSigO, 11 Apr 42; (2) OCSigO R&W Action 2,
ommendation for immediate curtailment of crude R&AC Br to Scheduling Div, 16 Apr 42, sub:
rubber consumption in manufacture of wire W— Conservation of rubber. SigC FM 400.12 Conserva-
110-B, Incl with Memo, Maj Norman I. Adams, Jr., tion of Rubber. (3) Novick, The Signal Corps
O/C Fld Lab No. 2, for CSigO, 1 Apr 42, sub: Policy of the Conservation of Critical and Strategic
Rubber conservation in wire W-110-B. SigC FM: Materials, p. 12.
36
Rubber Conservation 1942. Terrett, The Emergency, p. 182.
160 THE SIGNAL CORPS
increasing the number of crystals by a more To realize the primary objective, which
economical use of the insufficient supply of was to help the manufacturers build up their
raw quartz immediately became inadequate, facilities to the point where production
once war was declared. The Signal Corps could meet requirements, the section devised
had to act swiftly and effectively. An enor- an extensive technical program, dividing
mous increase in production had to come it into three phases. First, the technical staff
about and before that could be realized, the visited the old-line crystal manufacturers,
crystal-cutting handicraft had to be trans- observed their techniques, obtained full de-
formed into an industry; a manufacturing scriptions of methods, processes, and equip-
art had to shift from laboratory to mass ment used, including blueprints, diagrams,
production. Prospective manufacturers of instruction booklets, and photographs, and
oscillator plates had been hard to find prior with this material established an informa-
to 7 December 1941, but by the turn of the tion pool to provide the latest technical in-
year they were presenting themselves at dis- formation. Thus the newcomer to the field
trict offices and in the Office of the Chief and the small manufacturer of longer stand-
Signal Officer in large numbers. It was clear ing could profit by the most up-to-date de-
that many new factories would have to be velopments worked out within the shops of
established to provide for the wartime needs Western Electric, Bendix, and other large
of the armed forces, but it was equally clear companies. Second, this section established
that any new manufacturer of crystal plates an equipment pool, with the Defense Sup-
was going to have a hard time finding skilled plies Corporation providing $1,500,000 in
workers and tools for his plant. contracts for mass production of the equip-
On the recommendation of the Army ment. As long as machine tools remained
Communications and Equipment Coordi- critical, the section allocated them from the
nation Board and the Civilian Advisory pool. Third, staff members made field trips
Board, following a February survey of the to the factories to help the manufacturers
crystal situation, the Chief Signal Officer not only with technical information and
established a Quartz Crystal Coordination equipment from the pools, but also with
Section in the Materiel Division under the financial and priority problems. Basic to
direction of Lt. Col. James D. O'Connell to this educational program for the industry
get "the rapid disorderly growth of the in- was a handbook issued by the section, which
dustry under control" and to clear the way established a standard terminology so that
for mass production of crystal units.37 The for the first time a given term had the same
new section had its own problem of person- meaning throughout the industry.
nel shortage, but beginning with 2 officers The Signal Corps selected prospective
and 11 civilians, it developed a nucleus manufacturers on the basis of demonstrated
of highly qualified engineers, physicists, and ability to produce acceptable crystals at the
crystallographers. By June, the staff had minimum rate of 500 per week. To encour-
grown to 40, but the work load increased far age promising applicants, there were edu-
more rapidly. cational orders and development contracts.
At the same time the Signal Corps urged
37
Memo, Col Crawford, Com Coord Br OCSigO, firms with prewar experience in crystal
for CSigO, 28 Feb 42, sub: Case 23—Crystal rqmts.
SigC C&E Case 23 Crystal Rqmts. fabrication to expand and to develop sub-
THE FIRST BILLION DOLLAR SIGNAL CORPS 161
contractors, making government funds dispute that for some months interrupted
available to those who were unable to the flow of raw quartz from Brazil to the
finance their own expansions. Gradually the United States. Despite the precariousness of
number of facilities increased. At the out- basic supply, some good came of it. The
break of war there had been only twenty- shortage of raw quartz made the manu-
nine; by the end of the fiscal year there facturers more willing to accede to the Sig-
were thirty-five, and most of the original nal Corps' proposals for smaller, thinner
number had effected expansions. To com- crystals for economy's sake.38 Until the war-
bat the shortage of skilled workers, the Sig- time shortage confronted them, crystal man-
nal Corps carried on a training program for ufacturers had made oscillator plates with
engineers at Camp Coles during this period a surface measurement of about a square
and then sent the graduates to the plants to inch and a thickness of about a sixteenth of
conduct training programs among workers. an inch. There had been no insistent reason
While the Signal Corps was getting the for this practice; it was merely that the
situation in hand with respect to facilities, manufacturers always had made plates that
techniques, tools, and skilled workers, an-
other problem arose in the form of a price 38
Terrett, The Emergency, pp. 181-82.
264-211 O - 78 - 12
162 THE SIGNAL CORPS
size. Now, by a process of predimensioning, Steatite
they were able to reduce the size till the
plates averaged less than 3/10 of a square As in the case of quartz crystal, the short-
inch in area, with a thickness of 15/1000 to age of steatite threatened to upset Signal
18/1000 of an inch. Corps wartime procurement. Just as high
Also, the sudden need for crystal units frequency radio and radar performance de-
by the millions stimulated some major de- pended on the piezoelectric property of
velopments in manufacturing techniques. crystal wafers for holding a desired fre-
First in order of importance was the adop- quency, it depended upon the dielectric
tion of X-ray diffraction equipment for property of fired steatite parts for providing
control of cutting angles, the first instance the means of high frequency operation.
of using X-ray diffraction in a production Fired shapes of steatite with their remark-
line as part of a manufacturing procedure able imperviousness to extremes of tempera-
in this country, and the key to mass produc- ture, moisture, dryness, and acids, were
tion of crystal units. Bell Telephone used for insulators, such as grid spacers in
Laboratories had pioneered this work be- high frequency transmitter tubes, and for
fore the war. In the first spring of the war, cores, bushings, and resistors in radio,
the Signal Corps encouraged the work and radar, and other electronic equipment.
spread the technical information through- Steatite was critical throughout the war,
out the industry. North American Phillips but it was especially precarious during the
X-Ray Company and the General Electric first year and a half.
X-Ray Corporation designed and manufac- The Army could thank its Signal Corps
tured the equipment. Another Bell Tele- procurement planners that the situation was
phone contribution was the process of etch- not even more desperate. For more than a
ing to frequency as a means of retarding de- year, the Signal Corps had done what it
terioration of the oscillator plate. Working could to increase steatite production despite
with the Signal Corps Laboratories, Bendix industrial indifference, special problems of
developed improved cutting techniques and manufacture, and distance between the
contributed to the design of crystal lapping source of supply of raw material and the
equipment. G. C. Hunt and P. R. Hoffman manufacturing plants. It had sparked the
Companies developed the precision plane- industrial expansions in six companies that
tary lap. Galvin Manufacturing Company were expected to increase dollar value of
perfected the milling method of finishing production by about $9,000,000 by the end
crystals. Reeves Sound Laboratories ap- of the year. Now, with armament estimates
plied X-ray irradiation procedures to ad- rising relentlessly, and with hundreds of
justing crystal frequency and developed steatite parts required for every airplane,
safe etching compounds.39 every tank, every aircraft warning installa-
39
(1) Mary-louise Melia, The Quartz Crystal SigC 314.7. In 1943, the Camp Coles Signal Lab-
Program of the Signal Corps, 1941-1945 (1945), oratory developed a standard test oscillator to test
SigC historical monograph B-15, pp. 61-63; (2) a crystal under a great variety of conditions, re-
Quartz Crystal Coord Sec, Gen Dev Br OCSigO, sulting in improved quality of the crystal units pro-
Handbook for the Manufacture of Quartz Oscil- duced, and the various laboratories devised holders
lator Plates, 20 Aug 42, pp. 72-74. SigC Hist Sec for the crystals that would withstand tropical heat
File. (3) Daily Data, Proc Plan Sec, 12 Mar 42. and humidity.
THE FIRST BILLION DOLLAR SIGNAL CORPS 163
tion, it seemed likely that the best it could some of the steatite grade talc for electronic
do was not going to be good enough. purposes. No substitute for steatite talc could
The Joint Army and Navy Munitions be found for insulators.42
Board took official cognizance of the serious- Disturbed by the Army and Navy Mu-
ness of the problem in February by creating nitions Board Steatite Committee figures,
a special steatite committee. Thereafter all the director of the Signal Supply Service,
military needs could be figured and dealt General Colton, asked Col. Louis B. Bender
with through co-operative effort. The first to make a special study of Signal Corps
estimates of the committee in February steatite requirements. The steatite crisis de-
showed that Army and Navy requirements layed Signal Corps equipment deliveries
for steatite would reach a value of during April and May, even though total
$27,000,000 during the year; corresponding steatite production in those months was 15
estimates of possible production, taking into percent and 19 percent greater than the
account all known plant expansions to be combined requirements of all users. Behind
made, stopped short of $20,000,000, and it this seeming anomaly lay a notable lack of
was expected that the year 1943 would bring systematic scheduling of production on the
a 100-percent rise in requirements.40 manufacturers' part to obtain a proper bal-
With the declaration of war, the manu- ance between the hundreds of types of parts
facturers lost much of their fear of large- needed. Signal Corps contractors were pro-
scale expansion, but the existing plants could vided with enough of the simple, easily pro-
not be expanded much further because of duced parts to last for months, but had
the critical shortage of machinery and ma- none at all of other types needed for current
chine tools and the difficulty of getting addi- production. The steatite manufacturers,
tional supplies of them manufactured. The faced with schedules they considered impos-
established manufacturers began to co-op- sible to meet anyway, often chose to neglect
erate much more closely with the Signal certain items ordered and kept on making
Corps. For instance, they volunteered to sur- large quantities of others, particularly the
vey tile and porcelain manufacturing plants simple parts on which newly hired employ-
to see whether any could convert to steatite ees could be trained. Buyers had to share
manufacture. 41 They also undertook research the blame because they often neglected to
to develop substitutes of plastic or glass, place their orders early enough. They or-
though neither proved satisfactory. A val- dered other components as soon as they got
uable contribution by the industry was its their contracts, but steatite parts seemed so
experimentation with substitutes for steatite simple, so innocuous, that they neglected
talc, which demonstrated that other mate- them, then were distressed when they could
rials or the lower grades of talc could be not get delivery within two to four weeks.
used for a number of commodities needed 42
(1) John B. DeMille, Strategic Minerals, A
by the military organization thus releasing Summary of Uses, World Output, Stockpiles, Pro-
curement (New York and London: McGraw-Hill
40
OCSigO R&W, Capt K. M. Soukaras to Col 1947), pp. 468-78. (2) I. D. Adams, Industrial
Rives, 5 Mar 43, sub: Steatite insulation. SigC Summary: Signal Corps Procurement of Radio-
413.44 (Ceramics). Grade Insulation with Recommended Operating
41
Daily Data, Proc Plan Sec, 8 Feb 42. Procedures, 15 Feb 46, p. 16. SigC Hist Sec File.
164 THE SIGNAL CORPS
it necessary for the Signal Corps to hire losing sight of purpose, that is, centralized
Wallace Clark and Company to manage it control but decentralized operation. The
at the rate of $53,000 a year? Somervell, Chief Signal Officer gave the firm complete
who had known the company for "many freedom to peer into all functions and pro-
years," replied that he thought it "excel- cedures, to work with employees and man-
lent" and was confident that it could per- agement at all levels, and to move its con-
form management services "in a much more sultants about, within, and between installa-
economical manner" than the Army could.49 tions, in order that they might get a com-
The management engineers served as plete picture of the interrelationships of
fact-finders and advisers only. Many of the Signal Corps agencies and in order that the
Clark studies were directed toward simpli- entire Corps might benefit from the sur-
fying the flow of work through the supply veys. The Production Expediting Section
organization with a view to expediting in- was one of the first to come under the
dustrial production. They noted a number scrutiny of the Wallace Clark firm, whose
of obstacles in the way but admitted there experts felt that the unit was weak. They
was little the Signal Corps could do about found that as many as six Signal Corps
some of them. They pointed to the yearly representatives from different units had
basis of the Army Supply Program, to the upon occasion descended upon a factory
quarterly basis of the Training and Mobili- with no agreement among them as to what
zation Plan, which in turn was predicated expediting involved. The Signal Corps,
on a different troop basis from that used for lacking a united front, was fair game for
the Supply Program, and to the Expendi- the contractor who wanted to play off one
ture Programs which matched neither. Here expediter against another.50
was confusion, but confusion that was the The Wallace Clark production engineers
order laid down by the War Department for set up a plan that divided the continental
the Signal Corps to follow. United States into 100 areas, each with an
The Wallace Clark methods included the expediter attached to the Procurement Dis-
design of suitable flow charts and executive trict in which the area was located, but
control charts and the planning of efficient merely "for matters of discipline and for
techniques of management. The firm exam- cooperation." The expediters would be free
ined and synchronized delivery schedules to come and go and to use the facilities of
and precedence lists, proposed new ways of the district offices, but they would be under
doing things, and recommended procedures the functional supervision of the Production
for carrying out the proposals. They sug- Expediting Section of the Office of the Chief
gested shifts in responsibility; in some cases Signal Officer. The field expediter for an
decentralization of functions from the Of- area would triumph over cross-purposes and
fice of the Chief Signal Officer to the field duplication by making sure that he accom-
and the establishment of new field agencies. panied any officer or employee sent to a
In some instances their recommendations factory in his area. So argued the Wallace
seem to have stressed routine to the point of Clark experts, and the Chief Signal Officer
49 50
(1) Memo, Brig Gen Wilhelm D. Styer, CofS Ltr, Wallace Clark and Co. to Olmstead, 6
ASF, for Gen Code, Asst CSigO, 30 Mar 42; (2) Oct 42, sub: Summary rpt 11. Summary Rpt 11,
Ltr, Somervell to Hon. Andrew Edmiston, HR, 30 Wallace Clark and Co., Review of Progress. SigC
Mar 42. Hq ASF CofS File. Hist Sec File.
THE FIRST BILLION DOLLAR SIGNAL CORPS 167
agreed. They accordingly set up a training Both the War Department and the Civil
program for the initial 100 expediters. It Service Commission had believed that the
covered one week of indoctrination, a visit many applications on file with the commis-
to Fort Monmouth, instruction in factory sion would yield an ample supply of quali-
scheduling, and one week in actual field fied engineers. But the application forms
work. The Clark firm prepared a compre- were out of date. Many of the men could
hensive manual covering the points to be not be located, and of those who could be,
considered by an expediter on visits to a many were not qualified. No precise classi-
contractor, such as checking his bills of ma- fication for the expediters existed in Civil
terial, raw materials, tools and fixtures, Service records. Job descriptions were set
labor supply, plant load, production control up after numerous conferences and con-
methods, and factory organization.51 sultations between the Civil Service Com-
The Signal Corps expediters worked in mission and the Signal Corps. There re-
a very broad field. They were concerned mained the salary problem. Numerous men
with production problems of the entire com- whose abilities were just what the Signal
munications industry, not with those of just Corps wanted refused to work at the Civil
one company. Their duties took them into Service salary levels. Eventually an agree-
many plants; they had to have a working ment to base the annual salary offer on the
knowledge of the industry as a whole, and of average of the applicant's preceding five-
many factors affecting production: facili- year period of earnings proved successful.52
ties, materials, shortages, personnel, equip- Civil Service channels alone could not
ment types and standardization, packaging, dredge up enough qualified men. Officers
sources of supply, transportation, storage, and civilians carried on their own recruit-
and others. Above all, they had to have con- ing campaigns. Letters went to likely can-
stantly in mind the broad outlines of Signal didates all over the country. Industry
Corps procurement policy and the produc- spread the news. Procurement district offi-
tion goals that were to be reached. In many cials kept their eyes open for candidates.
ways, their duties touched and overlapped So did other Signal Corps agencies, the
those of other sections, especially in the field War Production Board, and the Office of
of procurement planning, despite the fact the Under Secretary of War. One group
that their concern was mainly with what of men came on duty because the motor
happened each day, or the next day, or the industry was languishing under the shut
next week, while the planning sections dealt down of the pleasure-car trade.53
with the projection of the large procure- By March 1942 the Expediting Section
ment plan into the months and years ahead. within the Office of the Chief Signal Offi-
Yet at the same time, the expediters could cer had twenty-five men, including a group
not ignore the distant goal nor take actions of engineers who worked with particular
that would seriously affect future programs. industrial materials such as ceramics,
They had to be men of great versatility and
52
expert knowledge, with a very sure touch. Ralph H. Clark, Expediting Activities of the
Such men were not easy to find. Office of the Chief Signal Officer, August 1941-
June 1944 (1945), SigC historical monograph
51
Ltr, Wallace Clark and Co. to Olmstead, 4 Feb B-14, p. 12. SigC Hist Sec File.
53
42, sub: Summary rpt 1. Summary Rpt 1, Wallace Daily Data, Prod Exped Sec, 29 Mar-30
Clark and Co. SigC Hist Sec File. Apr 42.
168 THE SIGNAL CORPS
quartz crystals, and tantalum. There was SCR-293 and 294 for the Signal Corps.
also a section handling machine tools, jigs, At the same time, peacetime orders for po-
and equipment programs on new contracts. lice and plant protection equipment clog-
Assigned from the procurement districts to ged the company's books. Expediters found
plants of the principal Signal Corps con- companies that could not make Signal
tractors and subcontractors were thirty en- Corps equipment, but could turn out the
gineers, with others being added at the rate civilian sets, and arranged to have these
of ten per week. Each of these men had to concerns subcontract them, leaving the
master an intensive training course in the Link Company free to get out the tank
Washington section before he moved out to radios on schedule. Again, the Connecticut
a field location, taking with him the for- Telephone & Electric Company had a con-
midable 150-page Wallace Clark manual tract for 15,000 EE-8 telephones, and a
of instructions and information.54 very short time in which to produce them.
The months from March to June 1942 At first it looked hopeless, but expediters
were grueling for the men in Production helped out by getting materials, following
Expediting. The urgency to get out equip- up deliveries, and suggesting ways of speed-
ment overwhelmed them; for each problem ing and smoothing the manufacturing
solved, a dozen rose to take its place. Time processes. The telephones were delivered
became the most precious commodity in three days ahead of schedule.
the world. Every stenographer typed "To- Often the delivery of a small part or a
morrow Won't Be Good Enough" onto let- piece of machinery used in a manufacturing
ters. Letters were not good enough, as a process saved weeks or months of time.
matter of fact; the telephone and the wire- Expediters got air-blast cleaning equipment
less were the accepted tools of trade. Es- needed in the manufacture of radio receiver
pecially in the procurement districts, the BC-312 on 1 April instead of 1 June.
men went into factories to see for them- They saved six weeks on the delivery of five
selves what was needed. Half their time radio transmitters to the British. They pro-
was spent in field contacts, and, in many vided four X-ray machines for Western
cases, an expediter was assigned to a single Electric for crystal grinding test equipment
plant as a resident trouble shooter. Their a month ahead of time. They secured a
activities touched upon many a sore spot small reserve of spring copper for a com-
in the procurement body. By following a pany that could not fabricate cutting blades
field engineer or a staff expediter around for the quartz crystal trade without it. They
for a couple of days, a man from Mars saved three weeks' time by speeding up the
would have had a fairly comprehensive delivery of binding head screws which
idea of where the chokepoints in the pro- threatened to delay Gilfillan Brothers on the
curement program lay. interphone RC-27. With their help, Hew-
For example, smaller plants converting lett-Packard saved four weeks' time in de-
to war work needed help. The Fred M. livering parts for filter equipment used by
Link Company was making tank radio sets their prime contractor, Airadio, Incorpo-
rated. A speed-up of three weeks on delivery
54
Memo, Dir of Supply Sv to Deputy CSigO, 8 of brass shells from the Ramsdell Tool Com-
Mar 42, sub: Prod schedules. SigC 400.192, Prod
Exped 6, 1-20 Mar 42. pany permitted the Lundquist Tool and
THE FIRST BILLION DOLLAR SIGNAL CORPS 169
Manufacturing Company to deliver certain tantalum, copper, or some other scarce ma-
items to its contractor, A. J. Ulmer. West- terial. Expediters often interceded with the
inghouse was building switchboard BD-57, War Production Board to get allocations of
but a subcontractor delivered faulty commu- material. Quite naturally, every firm en-
tators. Expediters arranged to have the com- gaged in war work felt that the order it was
mutators sent back and reworked, shipped to fabricating was more important than any
Westinghouse by air express, and assembled held by another firm. It was part of the ex-
and inspected on Sunday in order not to stop pediters' ticklish problem to know which
the Westinghouse production line. Teletype actually did have precedence and to help
Corporation needed small motors, but could those firms most critically in need of assist-
not specify exactly how many, nor when it ance. For example, the Murdock Manufac-
would need them. Expediters worked out an turing Company's threatened shutdown in
arrangement with General Electric to build its production of headset HS-39 was averted
up a bank of these motors so that they would when expediters obtained a release of 6,000
be on hand when Teletype needed them. pounds of crude and 6,500 pounds of re-
When Lapp Insulator was reduced to a claimed rubber. Lapp Insulator Company
three-day supply of mast subassemblies, se- could not get the cone-pointed machine
cured from the American Phenolic Corpora- screws it needed from Rochester Machine
tion, expediters had two hundred of them on Screw Company because that company had
hand within twenty-four hours, and a prom- a large bank of other orders, all carrying the
ise from American Phenolic to deliver fu- same A-1-A priority rating. Stromberg-
ture requirements on schedule. Carlson could make the screws but did not
The production expediters were not pri- have the steel. Rochester turned over part
marily concerned with the problems of sub- of its steel to Stromberg-Carlson, and Lapp
stitution of materials, but their work Insulator got the screws it needed on time.
brought them into contact with the matter, Expediters got the consent of the De-
and they sometimes acted as liaison men partment of Interior to refine American
between firms and the other offices of the crude oil into penetration asphalt for elec-
Signal Corps. They succeeded in getting a trical cables to replace asphalt previously
satisfactory substitute for sheet aluminum received from Colombia, Mexico, and
that Crosley Radio Corporation needed for Venezuela. They got a WPB release for
the 13,000 sets of radio SCR-284 it was typewriters with special type and spacing,
building. They got a different type of 200- which Philco needed to type calibration
watt transmitter for a radio station, and charts for the SCR-211 frequency meter
saved a month's time. They interceded to set, as well as 10,600 rubber bushings for
win permission for Bendix to replace stea- aircraft shock absorbers. They found my-
tite resistors and switch bodies with calex hub insulators required for assem-
porcelain. bling antenna reels and shipped them air
Sometimes it seemed that every firm in express to Aircraft Accessories Corp. They
America wanted a higher priority rating, arranged with the Air Corps to divert
and wanted the Production Expediting enough aluminum to Western Electric to
Section's help in getting it. Everybody finish up the command sets, SCR-2 74.
needed nickel, mica, aluminum, steatite, Westinghouse got the steel tubing it needed
170 THE SIGNAL CORPS
for SCR-270 towers, and saved a month's drying the generator cases of the SCR-284
time. in four hours instead of the original forty.
Crystals were in short supply everywhere. On the west coast, they persuaded officials
At Bendix, the resident expediter checking of the Southern Pacific Railroad to change
the crystal stock found it so low that in- train schedules so that a number of com-
spection of SCR-211's would soon have muting employees of the Eitel-McCullough
been stopped. He got enough crystals to Company in San Bruno, California, could
keep the production and inspection lines get to work on time. In the east, they ar-
going smoothly. Both Cardwell Manufac- ranged a meeting between executives of the
turing Company and Zenith Radio got Bliley Electric Company and the New York
their crystals from General Electric. Card- Central Railroad, and worked out an agree-
well had enough; Zenith had almost none ment for additional space from the rail-
on hand. Expediters arranged to divert a road to house Bliley's office and engineer-
Cardwell order to Zenith to keep both turn- ing department, for which Bliley had been
ing out SCR-211's. A Signal Corps resi- negotiating unsuccessfully for months. At
dent expediter at RCA earned a commen- Erie, Pennsylvania, not only Bliley but also
dation for his assistance in expediting ship- the Burke Electric Company had been try-
ment of tubes and crystals for a radio trans- ing to effect simple changes. For two years
mitter at Generalissimo Chiang Kai-shek's Burke had wanted a traffic light installed
headquarters in China. The Donald M. at a busy intersection. An expediter visited
Murray Company, one of the principal sup- the mayor of Erie and worked out an ar-
pliers of quartz crystal, chartered a freighter rangement whereby the city stationed a
airplane to transport quartz from Rio de traffic policeman at the intersection during
Janeiro to relieve the desperate shortage of the rush hours.55
quartz. Through co-ordination with the Air By April small business was beginning to
Priorities Section of the Department of get the hang of things. Production Ex-
Commerce, Signal Corps expediters ar- pediting engineers felt proud of Consoli-
ranged air freight to replace the ballast cus- dated Radio Products Company, in Chi-
tomarily used on the chartered plane, thus cago, a firm they had sponsored as a
bringing the price of the quartz down from potential manufacturer of headsets. Con-
a dollar and a half to a dollar a pound. solidated went about the job energetically,
The White House signal detachment asked for and got contracts from the pro-
needed twelve special radio crystals. To get curement districts at both Wright Field and
them, it looked as if production lines from Philadelphia, tooled up, and was delivering
regular crystal suppliers would have to be sets within four weeks' time. Consolidated
disrupted. Expediters found two sources of also supplied headsets to Signal and Air
supply, which together could furnish the re- Corps schools in emergencies when the
quired crystals. They were shipped the same schools found themselves without equip-
ment because their routine requisitions had
day the order was placed.
There were other problems that did not 55
Memo, O/C Proc Div for Chief of Mat Br
fall into any convenient category, but which OCSigO, sub: Weekly prog rpt (throughout
RP-319.1, Weekly Digest, 1941-42. Digests of the
were important in their effect on the war same materials are in Weekly Achievement Re-
effort. Expediters developed a method for ports for periods mentioned.
THE FIRST BILLION DOLLAR SIGNAL CORPS 171
been diverted to meet more urgent needs. sion men were going to the Joint Army and
Signal Corps inspectors at the Belmont Ra- Navy Munitions Board and the War Pro-
dio Company agreed that the BC-348's duction Board whenever additional allo-
which Belmont was building were of con- cations of raw materials were needed on
57
siderably better quality than the same sets contracts. Other sections were similarly
being turned out by one of the Big Five confused. The Purchase Section made
concerns. They cited the Rauland Corpora- cross-country calls for information which it
tion as an example of active, progressive could have obtained by picking up an ex-
management. Rauland had gathered to- tension phone and dialing Production Ex-
gether a supply of most of the critical ma- pediting.58 The expediters' field manual in-
terials and items under its own roof or at structed the engineers to make plant sur-
nearby plants. Unable to get critically short veys on their first visit to a plant. It ap-
variable air condensers for the SCR-211 's peared that much of this material was a
it was building, Rauland built its own con- duplication of information already on file
densers, and had enough to supply Zenith or available to the procurement planners.59
Radio Corporation as well, relieving the Yet if the expediters were sometimes over-
strain on the principal supplier.56 eager, or trod on too-sensitive toes, or in-
There were fumbles and failures as well truded in fields held sacred by other activi-
as successes. Scheduling was not yet smooth ties and organizations, they nonetheless had
enough for production lines to keep going a very solid record of accomplishment be-
without interruptions. For example, the hind them as the fiscal year drew to a close.
Stromberg-Carlson Telephone Manufac- When the section was organized in August
turing Company, building BD-96 and BD- 1941, out of 65 selected critical items, only
97 switchboards, got an additional order 46 percent were on schedule or ahead of
too late to prevent an interruption to the schedule and the rest lagged far behind. By
production line. Shutting down meant a the middle of May 1942, a survey of a simi-
two months' delay. Crosley Corporation lar selected group of critical items showed
was slow in getting the SCR-284 into pro- that 74 percent were on schedule or ahead of
duction. Five expediters stationed at the schedule. The remaining 26 percent were
plant to assist on various components had behind schedule by only a small amount of
not succeeded in prying a single set out of time. This very marked improvement had
the plant by the middle of April. The in- been made in the face of an eight-fold in-
creasingly tight supply of steatite meant crease in contract awards: from $235,000,-
slowing down or closing numerous plants. 000, to $1,832,000,000. Not only that, but
The expediters, buzzing over the whole in August 1941 materials had been easy to
procurement clover patch, sometimes got get, and now manufacturers faced shortages
in the way of other sections working on the on every hand. Yet production schedules had
same problems. The fault often lay with bettered materially in the face of all the war-
overbroad or ambiguously worded direc-
57
tives. In May both Production Expediting Daily Data, Pur Sec, 13 May 42.
58
Ibid., 12 May 42.
Section and Facilities and Materials Divi- 59
Memo, O/C Evaluation and Correction Div
OCSigO to Deputy CSigO, 25 Mar 42, sub: Conver-
56
Daily Data, Prod Exped Sec, 29 Mar-30 sion of radio mfg industry for war prod. SigC
Apr 42. 400.192, Prod Exped 7, 21-31 Mar 42.
172 THE SIGNAL CORPS
born problems that plagued the industry. Production Expediting Section in the Office
That this was in great part a result of the of the Chief Signal Officer relinquished di-
62
efforts of the expediters can hardly be ques- rect control except in the case of dispute.
tioned.60 The effect was to give the procurement dis-
The centralized plan was not without its tricts greater control over the expediting
defects, however. The procurement districts function as it concerned contracts, and at
were dissatisfied with the arrangement. the same time to provide a separate agency
Their most potent argument was the entirely to co-ordinate the expediting activities in
logical view that since the district contract- manufacturers' plants. By the end of the fis-
ing officer made the contracts and was re- cal year, the staff totaled twelve officers and
sponsible for the manufacturers' perform- 385 civilians, including both field expediters
ance under them, his office and not and regional officers.63
Washington should have direct control over In the meantime, the Navy was finding it-
all matters affecting contractual arrange- self at a disadvantage when it sought to
ments. Expediting was supposed to be a tool place communication equipment orders that
by means of which the contracting officer were relatively small compared to those of
met his obligation for keeping deliveries on the Signal Corps. A system of priorities in-
schedule on contracts placed by him. Under tended to determine the needs of contractors
the existing organization, direct control of for raw materials and component parts had
this tool was denied the contracting officer. been set up under the control of the Joint
Furthermore, the procurement district felt Army and Navy Munitions Board and oper-
that the "salesmen" employed by the Office ated among the Army, the Navy, and the
of the Chief Signal Officer for the work were War Production Board. The Navy had a
unsatisfactory. Expediting, they felt, was force of about twenty-five expediters in the
was not sales work, but production engineer- field and, in an effort to escape the over-
ing. They preferred the previous arrange- whelming production requirements of the
ment under which inspectors working out of Signal Corps, had resorted to AA and later
the procurement districts' contracting offices AAA blanket priority orders. This ruse had
had handled expediting. The inspectors not proved altogether successful, and there
were engineers, competent to make decisions was evidence that neither the Signal Corps
on technical questions, and to consult with nor the manufacturers liked it because quite
manufacturers on engineering problems.61 often it forced manufacturers to interrupt
A reorganization in June was intended to their production lines on mass-produced Sig-
meet some of these objections. The area ex- nal Corps items to take care of small quanti-
pediting offices were consolidated into ten ties of Navy equipment of slightly different
regional offices set up in ten major cities, and design.
the procurement districts established expe- Even the best efforts of the Munitions
diting sections to work through the geo- Board proved unable to effect equalization
graphically appropriate regional office. The of production for the Army and the Navy.
62
60
Daily Data, Prod Exped Sec, 5-21 May 42. (1) Ibid., pp. 209-11. (2) O/C Proc Div
61
James J. Cerruti, Historical Narrative of the OCSigO, Weekly Prog Rpt, 25 Jun 42. SigC RP
Philadelphia Signal Corps Procurement District 319.1, Weekly Digest, 1941-42.
63
(1945), pp. 206-09. SigC Hist Sec. File. CSigO, Annual Report, 1942, p. 87.
THE FIRST BILLION DOLLAR SIGNAL CORPS 173
A series of studies by General Code and Expediting Agency (ANCPEA). None of
General Colton for the Army and by repre- the functions of expediting were to be
sentatives of the Navy and the War Pro- changed; the efforts of both the Army and
duction Board pointed the way for a closer Navy were merely combined in an attempt
union. On 21 July 1942 the Munitions to eliminate the confusion and competition
Board issued a directive providing for a between the two. Col. George P. Bush was
merger of the Army and Navy expediting relieved from duty in the Materiel Division,
procedure. The Production Expediting Sec- and assigned as director of ANCPEA with
tion of the Signal Corps as such passed out Comdr. Mortimer R. Loewi, who had di-
of existence and, with the attachment of rected the Navy's expediters, as alternate
Navy officers to the headquarters and re- director. The Army and Navy Munitions
gional expediting offices, became the Board would act as referee and arbiter in
Army-Navy Communications Production case the weather got rough.64
By mid-spring of 1942, the field organiza- All these agencies were rapidly assuming
tion necessary to carry out the Signal Corps' shape in the field organization by the spring
supply mission was evolving. Responsibility of 1942.
for placing the infinite variety and unprece-
dented number of war contracts rested with The Procurement Districts
the Signal Corps' procurement districts. In-
spection was still regarded as a part of the Prewar planning had assumed that the
procurement district functions, on the procurement districts would take over the
theory that the contracting officer who handling of contracts almost entirely once
placed the contract for material was re- war started, but it was not possible to free
sponsible for seeing that he got what he had the districts completely until after the Army
ordered. The biggest supply job was to place reorganization of March 1942 and the or-
orders, to start production lines rolling, to ganization of the War Production Board.65
On 16 March the Under Secretary of War
build up a mass of supplies to equip the
delegated to the chiefs of the operating serv-
expanding Army. As soon as the orders were
ices of SOS authority to approve contract
translated into terms of wire, radios, or
awards in amounts up to $5,000,000 as well
vehicles, the equipment had to be stored,
classified, packaged, marked, and made 64
(1) Clark, Expediting Activities of the Office
ready for shipment. This was the function of the Chief Signal Officer, pp. 31-38. (2) Memo,
Exec Officer Mat Br OCSigO for Exec Control Div,
of the Signal Corps depots. Increasingly, as 21 Aug 42, p. 6, Sec. IV, Item 1. Weekly Achieve-
functions were decentralized to field organi- ment Rpts, 15 Jun-16 Jul 42, SigC Central Files.
ANCPEA became the Army-Navy Electronics
zations and new complexes of related field Production Agency (ANEPA) on 28 October 1942.
agencies came into being at locations re- Clark, Expediting Activities, p. 37; Exhibit K, p.
76.
mote from Washington, there had to be ad- 65
Gerard, Story of Supply in the Signal Corps,
ministrative headquarters to supervise them. Pt. II, p. 17.
174 THE SIGNAL CORPS
as authority to redelegate this function to taining to aircraft radio inherited from the
their contracting officers.66 Now the legal Philadelphia district. The Chicago district
machinery was set up to permit the Signal bore the brunt of the requirements for wire
Corps' procurement districts to move ahead and cable and in addition was responsible
at a greatly accelerated pace. for the procurement of all dry batteries for
The procurement districts were organ- the entire Army, estimates for which were
ized upon a horizontal structure. Each cen- leaping upward by the million. The San
tralized its purchases to deal with the sort Francisco district was less affected than
of equipment most needed in its field.67 The others simply because there was little manu-
measures and directives which conferred facturing of Signal Corps items in its vicin-
more and more authority upon the districts ity.
brought about administrative reorganiza- The busiest of the lot, the Philadelphia
tions to handle new responsibilities. The dis- district, was new in name and in location
trict contracting officers enjoyed a new but derived in fact from the transfer of peo-
freedom both in signing and in amending ple and functions from the oldest district,
contracts and in making advance payments the New York office. It bought ground
without reference to higher authority, but radio and radar equipment and all sorts of
the privilege of independent judgment car- associated and miscellaneous items. Phila-
ried with it heavy responsibilities. Increases delphia was the approximate center of the
in the price of labor and materials and de- area in which the radio and communica-
lays in the delivery of essential raw products tions industry plants were located. And it
complicated the contractors' problems and was placed halfway between Washington,
required legal counsel and auditing facili- whence came the broad policy decisions,
ties to be close at hand. Orders multiplied and New York, the major east coast ship-
dizzily, contracting officers placed them ping point for overseas operations.
faster, deliveries arrived more quickly and In the sprawling quarters at 5000 Wis-
in greater quantity, and depots overflowed sahickon Avenue, Col. Archie A. Farmer
their warehouses. All installations needed held sway as commanding officer of the
more workers than they could get and, ex- Philadelphia Signal Depot, of which the
cept in Philadelphia, double or treble the procurement district was technically a di-
office space on hand. vision even though it functioned as a sepa-
The new Wright Field Signal Corps Pro- rate agency. Its chief and contracting of-
curement District (soon to be renamed the ficer was Lt. Col. G. L. Thompson, who
Dayton Signal Corps Procurement Dis- had moved with the agency from New York.
trict) had been in a whirl of activity from He had been with it since 1937, in the days
the very first and now, in addition to its when he had two civilian assistants, one
great weight of new orders for aircraft radio for procurement operations and one for in-
equipment, was struggling with a backlog spection functions. The number of civilian
of contracts, requisitions, and orders per- employees in that bygone period had fluc-
tuated between 8 and 20. By late 1941 the
66
CD Gen Dir 29, 16 Mar 42, sub: Clearance staff had grown to 14 officers and 450 civil-
of contract awards.
67
Gerard, Story of Supply in the Signal Corps, Pt. ians. In mid-1942 Colonel Thompson's
II, p. 18. force was multiplying so rapidly that it was
THE FIRST BILLION DOLLAR SIGNAL CORPS 175
hard to quote exact figures for any given Contracting officers had at hand booklets
68
day. prepared by the district, containing contract
The district functions still divided roughly and purchase request clauses, samples of
into the dual patterns of procurement and contractual instruments, and other informa-
inspection. Obviously, if more equipment tion useful so long as the contract fell within
were purchased, more inspectors would be the usual legal framework. As often as not,
needed to check it before the Signal Corps though, the manufacturer raised special ob-
accepted it. Each district hired and trained jections. Signal Corps letters of intent, for
its own inspectors, and there were never example, set a limit of 10 to 25 percent of
enough of them. Philadelphia set up a train- the cost of the material on the amount of
ing school and went aggressively about the funds that could be spent before the formal
business of hiring men. To recruit appli- contract was executed. Contractors felt that
cants for the nine months' course at this this was too severe. If the reason for mak-
school, it arranged for a civil service repre- ing a letter of intent was to permit con-
sentative to be located at the depot so that tractors to place orders and tool up to start
applicants could be interviewed and ex- work immediately, then there should be no
amined on the spot.69 restriction of funds, they argued. They cited
"Speed, not cost, is the dominant factor," the letters of intent issued by the Navy,
said the Under Secretary of War in his which bore no such limitation.72
memorandum to the supply chiefs on 29 Especially in the early months of 1942,
December 1941.70 Speed was the objective when industry was converting to war work,
at Philadelphia. Try as a man might, there the contracting officers found firms bidding
was more to placing a contract than a sim- too optimistically. The Office of the Chief
ple matter of offer and acceptance. In all Signal Officer had a Facilities and Mate-
conscience, the contracting officers had to rials Branch formed from the remnants of
assure themselves that prices were fair and the Procurement Planning Section; so did
reasonable and that contracts were in the the Philadelphia district. These groups knew
best interests of the government. In case of a great deal about the productive capacity
doubt, they called for a cost analysis. For and capabilities of various manufacturers
the benefit of smaller plants, they negotiated and were constantly surveying plants, noting
contracts at prices 15 percent above the idle capacity, and assisting industry in vari-
lowest quotation received. They eliminated ous ways. Between them, they could usually
bid bonds and performance bonds, broke supplement the contracting officers' own in-
up large requirements in order to spread formation about any given firm. Another
production, and gave great weight to earlier difficulty in making a contract centered in
delivery dates in evaluating bids.71 equipment specifications. Particularly for
68
the newer equipment, there existed only
Cerruti, Historical Narrative of the Philadel-
phia Signal Corps Procurement District, 18-21.
rather sketchy performance specifications.
69
Ltr, OCSigO Proc Sv, Inspec Sec, to Dir of Contractors found them ambiguous, or in-
ARL, 15 Jan 42, sub: Tng of Inspec Pers. SigC adequate, or impossible to meet. In such
400.163 Inspec 1, Jan-Mar 42. cases, they either refused to bid, or bid with
70
PC-P 400.13, Broadening the Base of Defense
Prod, 29 Dec 41. exceptions to the specifications, with result-
71
Cerruti, Historical Narrative of Philadelphia
72
Signal Corps Procurement District, p. 141. 1bid., pp. 180-81.
176 THE SIGNAL CORPS
264-211 O - 78 - 13
178 THE SIGNAL CORPS
and exasperated the manufacturer, who transform the section into a division, with
supplied office space for them. Such dupli- numerous sections and subsections, nothing
cation also wasted critically short inspection came of it. The firm of Wallace Clark, in-
manpower. dustrial consultants to the Chief Signal Of-
There were other cases of inefficiency. ficer, confessed that it had no experts qua-
Distance between an inspection unit at a lified to pass on the merits of the plan, and
plant and the headquarters to which it was suggested that such an expert be employed.
attached meant delays in handling papers Again General Olmstead turned to business
and reports by mail, high costs for telephone for help. He asked Western Electric to re-
and telegraph communication, and exces- lease George L. Schnable, who had been
sive travel time and cost. The differences in the assistant superintendent of inspection at
organizational structures between the lab- Western Electric's Hawthorne plant. On 4
oratory and district inspection units, and May, Schnable and Stanley Woolman, an
between the districts themselves, provided engineer from the Inspection Section, Of-
a perfect breeding ground for variations in fice of the Chief Signal Officer, started on a
inspection policies and procedures. Inspec- tour of the country which would take them
tion was a stepchild organizationally, since to plants, inspection units within districts
the agency to which it was attached had a and laboratories, and for talks with indi-
primary function other than inspection. In- vidual inspectors.84 Out of the mass of in-
spectors complained that they had too little formation which they expected to accumu-
supervision and no close contact, and did late would come a plan for betterment of
not have a chance to present their side of the inspection service. Their report would
arguments with the manufacturers. Both not be laid on General Olmstead's desk for
prestige and morale of the inspection forces several months to come, but as the fiscal
were low.82 year drew to a close, preliminary informa-
The Inspection Section within the Office tion trickling back indicated that a general
of the Chief Signal Officer had to fight for reorganization of the inspection structure
its existence from the very moment of its could be expected. Inspection would be sep-
inception in the closing days of 1941. Three arated from the procurement districts and
months passed before its officer in charge set up in housekeeping for itself as an in-
was able to spend his full time on his as- dependent agency with systematized pro-
signed duties. It was another month before cedures.
any engineers were assigned, and in April
1942 the section had only three at its peak The Expansion of Signal Corps Depots
strength. Only one of these had any exten-
sive inspection experience. Its strength in In the prewar period of emergency, the
May consisted of six officers, only two of Signal Corps depot system consisted of only
whom had direct inspection experience.83 five signal sections in Army general depots,
Although the section drew up an ambi- with warehouse space amounting to ap-
tious organization chart with places for 84
Memo, Exec Officer Mat Br OCSigO for Exec
sixty-three officers and produced a plan to Control Div, 15 May 42, p. 9, Item 15. Weekly
82
Achievement Rpts, 27 Apr-8 Jun 42. SigC Central
Ibid., p. 4. Files. For the story of inspection activities from June
83
Ibid., pp. 5-6. 1942 to June 1943, see pages 509-13, below.
THE FIRST BILLION DOLLAR SIGNAL CORPS 179
88
proximately 350,000 square feet.85 By 7 knowledge of the set, would take over.
December 1941 the distribution facilities of Within the continental United States in
the Signal Corps in the United States had early spring 1942 the Signal Corps had only
grown to seven signal depots with total floor the depot at Philadelphia, with another
space of 2,019,000 square feet, 1,500,000 of under construction at Lexington, Kentucky.
it actually used as storage.86 Six and a half It had also signal sections within the Chi-
months after Pearl Harbor, there were cago Quartermaster Depot, and the general
depots or depot space in 32 areas in the depots at New Cumberland, Pennsylvania,
United States, Alaska, Hawaii, Panama, and Atlanta, San Antonio, Ogden, and San
Puerto Rico, with a total of 7,776,214 Francisco.89
square feet of space available, or in the When unlimited emergency gave place to
process of being made available.87 war, the supply section of Utah General
This increase in depot facilities had not Depot at Ogden was still in the throes of
come about easily or all at once. Neither did organization and hiring, and already out-
it all represent space administratively under growing the 108,000 square feet of closed
Signal Corps control and devoted to the warehouse space and 3,600 square feet of
basic functions of a depot: receipt, storage, closed shed space that had been assigned to
and issue. Part of it had to do with the re- it. It estimated future requirements at about
pair, inspection, salvage, maintenance, pro- 432,000 square feet of the former and
curement, training, defense aid storage, and 40,000 feet of the latter. In January, prior
manufacturing functions assigned to many to removal of the signal section from the
of the depots as contributory duties. As a San Francisco General Depot in the Presidio
rule, the troops using the equipment would to new quarters at the Oakland Army Air
take care of first echelon maintenance; sec- Base across the bay, 50 percent of all signal
ond echelon would be a function of mainte- stocks in San Francisco were shipped to the
nance platoons; signal depot companies signal supply section in Utah. At the same
would accomplish repair at the third stage; time, substantial deliveries of wire and cable
and beyond that, the equipment would be were arriving. The warehouse and closed
sent to the nearest depot. If even this failed shed space was hopelessly inadequate and
to meet the need, fifth echelon maintenance no additional shelter was available. More
might involve moving the equipment to a than 1,000,000 pounds of cable on reels
lay out in the open; crating materials
signal depot or signal section of a general
piled up in the yards. The labor shortage
depot where civilian technicians, trained in
was acute and the depot had to compete
85
Capt Charles R. Novick, The Story of Supply
with three major military installations for
in the Signal Corps in World War II, Pt. IV, Dis- personnel: the Naval Supply Depot, the
tribution (1945), SigC historical monograph B-1d, Ogden Arsenal, and the Ogden Air Tech-
p. 21. SigC Hist Sec File.
86
SOS Staff Conf, 16 Feb 43, remarks of Olm- nical Service Command. Early in the
stead on duties and functions of Sig Supply Sv, year the Utah General Depot began to
OCSigO. SigC EO 36-337 Staff Confs (SOS)
Misc 9-2-42 to 6-2-43. transport several hundred high school and
87
OCSigO S&I Br, Rpt of James L. Dixon, Depot
88
Bldgs and Grounds Sec, sub: SigC storage space OCSigO Cir 11-2, par. 4, 14 Feb 42.
89
rpt, 1 Jul 42. SigC 400.242 Storage Space 2, May- Novick, Story of Supply in the Signal Corps,
Jul 42. Pt. IV, App. D.
180 THE SIGNAL CORPS
college students from northern Utah and On 5 June, the War Department approved
southern Idaho by train or bus to and from the recommendation that the signal storage
the depot on Saturdays and Sundays, dis- activity in Dayton be designated as the
tances of 74 to 160 miles the round trip. Dayton Signal Depot.92
The students unloaded the accumulation of The same month, the Chief Signal Offi-
incoming carloads that the regular labor cer ordered procurement, storage, and is-
sue of meteorological equipment trans-
force had not been able to handle during the
ferred from Philadelphia to Dayton. Its pro-
week.90
curement would thereafter be carried on by
Storage and issue functions in the Day- the Wright Field Signal Corps Procurement
ton area had originally been performed by District; its storage and issue by the Day-
the Wright Field Signal Corps Procurement ton Signal Depot.93 The new depot in its
District in a building constructed for the first month of operation stocked almost
purpose at Fairfield Air Depot. In addition, 16,000 different items of aircraft radio
the Air Service Command had designated equipment, a figure that rose before the
the signal section of the Fairfield Air Depot end of the year to just under 50,000 items.
as a backup facility and storage reservoir By the end of June, there was no empty
for signal equipment already turned over space, nor was it expected that there would
to the Air Corps. This depot at the begin- be any space at the end of December, al-
94
ning of 1942 stocked some 6,000 items of though still more was being sought.
airborne radio equipment. The need for As the pace of procurement quickened,
the lines of authority had to be shortened,
more space became desperate when ship-
and then shortened again, especially at
ments of aircraft radio material began to
Wright and Patterson Fields. In dollar
arrive from the Philadelphia Signal Depot, value, aircraft radio and radar equipment
which relinquished that class of equipment was rapidly approaching the point where
when it moved from New York late in 1941. it would exceed all other Signal Corps sup-
The volume of work increased so rapidly, ply activities combined. The Aircraft Ra-
to an average of 50 shipments a day by early dio Laboratory was responsible for research,
January, that Lt. Col. William J. Daw, offi- development, and inspection of this equip-
cer in charge of the district, took steps to ment. The Wright Field Signal Corps Pro-
acquire space in the first of several build- curement District bought, stored, and
ings in downtown Dayton. But as quickly issued it. Yet these two agencies, located
as he obtained more space, the multiplying only a few miles apart, had to consult Wash-
functions of the organization outgrew it.91 ington for most major decisions regarding
90 92
Utah ASF Depot, Ogden, Utah, History of the AG Ltr AG 681 Dayton Sig Dept (5-25-42)
Signal Supply Section, 30 September 1941-1 No- MR-M-SP, 5 Jun 42.
93
vember 1945. Sig Supply Sec File, Utah Gen Depot, 1st Ind [basic ltr lacking], Dir of Sig Supply
Ogden. Sv to O/C Wright Fld SigC Proc Dist, 4 Jun 42.
91
(1) History and Activities, Signal Corps Air- SigC 413.6 (5-12-42). S&I Agency Info File,
craft Signal Service, 1 Jul 43, p. 6. (Hereafter re- Philadelphia.
94
ferred to as Hist of SCASS, 1 Jul 43. SigC Hist (1) Hist of SCASS, 1 Jul 43, p. 6. (2) Ltr,
Sec File. (2) History of Dayton Signal Corps Sup- S&I Br OCSigO to Opns Div Hq SOS, 2 Jul 42,
ply Agency. WFSCPD File 314.7—Hist of Proc sub: Storage space. S&I Agency Info File, Phila-
Dist. delphia.
THE FIRST BILLION DOLLAR SIGNAL CORPS 181
their own activities, and had very limited ly about their working conditions. Restric-
fields of authority in making commitments tions clamped down after the coming of
to the Air Forces.95 Accordingly, in May war suspended the Saturday half holiday,
1942, with the concurrence of the Army Air added an hour to the work day, and spread
Forces and the SOS, the Chief Signal Offi- the six-day week over weekends on a ro-
cer activated a Signal Corps Aircraft Sig- tating basis; holidays were abandoned;
nal Service (SCASS), and appointed Col- leave curtailed.97 All depots had begun op-
onel Gardner director. erating on a 24-hour a day basis late in
The new fiscal year had not yet begun December,98 and night shifts were not pop-
before the new superagency added two more ular. All of these things added to employee
agencies to its domain. On 4 June the Chief dissatisfaction.
Signal Officer established the Signal Main- Only a part of the New York force had
tenance Section, and on 5 June The Adju- moved to Philadelphia with the depot and
tant General designated the storage facili- some of these only temporarily until their
ties of the Signal Corps in Dayton as the positions could be filled by new employees.
Dayton Signal Depot.96 These workers and others who had origi-
Philadelphia in early 1942 was still hav- nally intended to stay returned to New
ing housekeeping troubles. The combined York where they could live more comfort-
depot and procurement district created ably at home and find other positions with
from the old signal section and procurement industry as good if not better than the depot
district of the Brooklyn Army Base at the could offer, even taking into consideration
New York Port of Embarkation was not yet the pay for overtime which became effective
comfortably settled in its new quarters, but on 1 March.99 Some of the New Yorkers
it was making progress. One by one the formed the nucleus of the new Lexington
frustrations and annoyances of the move Signal Depot in Kentucky. The Philadel-
were dissipated as the Signal Corps began phia Depot suffered a heavy loss in experi-
to make the place more habitable, but enced workers. Turnover was high, even
building operations and office work had to among the newcomers. During the first four
proceed together and they did not mix well. months of 1942 over 3,300 men and women
Cables were strung over the heads of were employed and almost one third as
workers and fluorescent lights installed; many were lost through resignations and
radiators were suspended below the sky- military furloughs. The depot recruited local
lights around the walls of the offices; beav- labor, but in this case an untrained Phila-
erboard partitions were set in place to pro- delphian could not immediately fill the shoes
vide a small measure of privacy for a few
97
officials. While this was going on, steam- (1) EO 9018, 12 Jan 42. (2) WD Cir 16, 20
fitters with their hammers, pipes, and weld- Jan 42.
98
OCSigO R&W, S&I Div to Exec Control Div,
ing torches, painters and carpenters with 24 Dec 41. S&I Agency Info File, Philadelphia.
99
ladders and saws, all mingled with clerks Actsof 21 Oct 40, PL 873, 76th Cong, and 3
Jun 41, PL 100, 77th Cong. Computations of pay
and stenographers, who complained bitter- under these acts became so complicated that hun-
dreds of errors resulted. The Act of 22 December
95
Ltr, CSigO to CG AAF, 20 Apr 42, sub: SigC 1942, Public Law 821, 77th Congress, placed over-
reorgn at Wright-Patterson Fids. SigC 320.2 Gen. time pay on a yearly basis and made it applicable
96
Hist of SCASS, 1 Jul 43, pp. 1-11. to all employees. This greatly improved the situation.
182 THE SIGNAL CORPS
of a trained Brooklynite. Meanwhile, the to house some 8,000 items of photographic
demands of the draft boards cut deeper equipment and over 9,000 items of pigeon
every day into the supply of male labor. supplies.103 During the next month a small
Women began to take over jobs heretofore force of depot personnel moved in, but most
reserved for men, serving as chauffeurs, of the building was still occupied, and would
welders, assemblers, laborers, fork-lift op- not be available for several months.
erators, tractor drivers, machinists, crystal On 16 May the Signal Corps took over
grinders, and checkers. For these and other Annex No. II, a building to be shared by
jobs, the depot launched extensive training the Reading Railroad, and gained 333,183
programs.100 square feet of space.104 The equipment
On jobs requiring precision and patience, bought on early orders was rolling in; later
such as picking items from bin stock for on, larger orders would mean a further
packing, assembly work, and crystal grind- straining of warehouse seams. Colonel
ing, women performed excellently. Radio Farmer had the uneasy feeling that if he
crystals, for example, had to be ground to did not keep constant vigil, the flood of
extremely close tolerances for use in tele- equipment would engulf him. Incoming
type machines and other fixed plant instal- material rose from an estimated 10,757,747
lations. Commercial concerns did not want pounds in January to 14,005,850 in April,
to undertake the work, but the women depot and the outgoing from 7,015,062 to 9,-
workers handled it "beautifully." 101 295,406.105 To handle and process this
Depot space had seemed limitless when amount, he had a labor and office force of
the Atwater Kent plant had been acquired 4,987 in April, compared to 3,520 in Jan-
and the first items had arrived for storage: uary. Tonnage figures alone did not reflect
the trucks and trailers comprising ten SCR- the infinite variety and complexity of depot
197 radio sets.102 But by February the depot operations at Philadelphia. Of the 100,000
was filled to within 5 percent of capacity, items, some were so large it required a crane
and the space problem again loomed. To to move them. Others, such as hair springs
ease the strain, the maintenance and repair for repairing meters, were so tiny that they
group had moved out into a new building would disappear with a gust of wind.106
acquired from the Frankford Arsenal. In Meanwhile, at Avon, Kentucky, the Lex-
April 1942 the Signal Corps leased the first ington Signal Depot, destined to rival the
of five annexes: two buildings owned by Philadelphia Depot in size and volume of
the Quaker Hosiery Company and to be tonnage, was rising in record time. Begun in
known collectively as Annex No. 1, located May 1941, it was handling shipments of
about a mile from the main depot. One radar equipment by fall and became deeply
building contained three stories and a base- immersed in extensive training programs by
ment, and the other seven stories. Together winter and early spring. By May 1942 the
they provided 354,000 square feet of space, second phase of the construction was com-
100 plete. An administration building and guard
History of the Philadelphia Signal Depot
(hereafter referred to as Hist of Philadelphia Sig 103
Depot), II, 131. SigC Hist Sec File. Ibid., I, 67.
104
101
MS Comment, Brig Gen Archie A. Farmer, Ibid., I, 70.
105
Ret., 15 Mar 52. SigC Hist Sec File. 106
Ibid.,11, 157.
102
Hist of Philadelphia Sig Depot, I, 146. MS Comment, Farmer, 15 Mar 52.
THE FIRST BILLION DOLLAR SIGNAL CORPS 183
108
gate, three warehouses, service station, ga- found a home at the Philadelphia depot.
rage and motor repair shop, a paint and oil In June a new signal section was set up at
shop, central heating plant, fences, and util- Memphis. It was to act as a backup to the
ities added a somewhat more finished look New Orleans Port of Embarkation, and
to the establishment. It was time for official would furnish emergency supplies to points
recognition of the depot's existence. in the Fifth, Sixth, Seventh, and Eighth
Corps Areas.109
General Olmstead journeyed to Lexing-
Totting up the figures at the end of June
ton to deliver the principal address at the
1942, the Signal Corps found itself in pos-
formal dedication ceremonies before an session of 5,342,214 square feet of gross area
open-air assemblage of over 3,000 persons space actually completed, 920,000 under
on 29 May. He and the depot's command- construction, 625,000 authorized, and
ing officer, Col. Laurence Watts, had rea- 889,000 requested. At second glance, how-
son to welcome the new establishment. The ever, the figures were not so impressive. Only
reservation covered 785 acres of land; the 3,324,515 square feet of completed space
buildings were expected to provide over was actually usable for storage, and about 60
1,400,000 square feet of storage and office percent of it, 2,071,283, was in the three
space. At the end of February the total of big warehouses at Lexington, Dayton, and
employees, not counting those in training, Philadelphia. The rest was in general depots,
had been about 500. Before the end of June air depots, at ports of embarkation, and war
it was four times that number, a little over aid depots.110 At the Dayton, Chicago, and
2,000. In September 1941 the first 22 tons Ogden depots and at the Middletown and
of equipment had been more than enough San Antonio air depots, there was no vacant
for the few workers then employed to han- space at all. Col. Raymond C. Hildreth of
dle. Now in May 8,262,000 pounds were the Storage and Issue Branch estimated that
processed with ease and dispatch.107 for the rest of the calendar year the average
To some extent, the depots in this period percentage of idle storage space in all signal
specialized in the stock they carried. The depots would not exceed 15 percent at any
Chicago depot housed large stocks of tele- time.
111
saw its expenditures for equipment rise to a Perhaps more than any other, this figure
figure that would have been considered fan- pointed up the growth of the Signal Corps
tastic in the days of peacetime planning. procurement function and its importance to
More than $2,693,360,736 worth of con- the new Army. For now, in June 1942, the
tracts had been placed with American and Signal Corps was accepting every two weeks
Canadian manufacturers of Signal Corps as much signal equipment as the amount
equipment, and $3,000,000,000 more was procured during the entire course of World
soon to be available to the procurement di- War I.117 This was an impressive and en-
vision for additional equipment. Approxi-
couraging statistic. Still, procurement meas-
mately 75 percent of this sum had been
ured in terms of dollars did not by any
expended after the attack on Pearl Har-
115
bor. Deliveries were pouring into depots means tell the whole story. The real meas-
in ever increasing waves. By 30 June, 1942 ure of success or failure of Signal Corps sup-
deliveries of signal equipment, the larger ply lay in producing the right kinds of equip-
part of which would have required months ment, in sufficient quantity, and on time.
or even years to get into production under By that standard, it still had a long way to
118
peacetime conditions, totaled more than go-
$315,595,473, and the acceptance of com-
pleted items had reached a rate of more 117
In World War I, a total of $45,000,000 was
than $3,000,000 a day.116 authorized for Signal Corps material. CSigO, An-
nual Report, 1943, p. 232.
115 118
CSigO, Annual Report, 1942, p. 78. See pages 322ff., below, for an account of pro-
116
Ibid., p. 79. curement problems during the second half of 1942.
CHAPTER VII
Signal Schooling
(January-July 1942)
The Training Structure cer called the plays provided he could get
the practice field and the players.2
The Chief Signal Officer's responsibility The scope of technical signal training was
for the technical military training of Sig- broader than ever before. It had penetrated
nal Corps enlisted men and officers was a field of study hitherto occupied only by
exercised, after 9 March 1942, under the scientists and confined to highly scientific
delegated authority and the nominal super- institutions such as research laboratories.
vision of the Commanding General, Serv- The Signal Corps student body was made
ices of Supply. From General Olmstead the up of officers, enlisted men, enlisted re-
line of authority descended through the servists, and civilians, and it ranged from
chief of the Signal Corps Field Services, men with doctorates in engineering or phi-
General Milliken, and through him to Col. losophy to illiterates. Geographically, train-
J. D. B. Lattin, at the head of the Military ing extended from the single prewar training
Training Division.1 facility at Fort Monmouth, New Jersey, to
Although the Signal Corps was bound Signal Corps training centers newly estab-
by the manpower allotments and the train- lished in Florida, Missouri, and California;
ing policies of the War Department Gen- to civilian institutions throughout the land;
eral Staff and the Services of Supply, the and to the British military schools in the
United Kingdom. The Chief Signal Officer
Chief Signal Officer had direct jurisdiction
and his staff viewed the burgeoning train-
over the operation of Signal Corps replace-
ing centers with pride, encouraged by the
ment training centers and schools, which advances they represented. Nevertheless, six
were exempt from corps area control, and months of war had sent signal training re-
over the technical aspects of the training of quirements far beyond the expanded mili-
Signal Corps military and civilian person- tary facilities and the increased capacities
nel in civilian institutions. In technical com- which, indeed, had seemed to the Signal
munications training, the Chief Signal Offi- Corps to be cramped even in the planning
1
Signal Corps Administrative Log, 1939-1945,
stage.
OCSigO Orgn Chart 14, 9 Mar 42, p. 35. SigC 2
Hist Sec File. For troop and training difficulties AR 350-800, 1 February 1938, covering Signal
in January and February, 1942, see above, Chap- Corps training, specifically stated that the regula-
ter II. tion was only "general in nature."
SIGNAL SCHOOLING 187
As yet the calls for men had been confined training period was offset by the uneconom-
to activation needs except for the tragic loss ical use of manpower.
requirements of the forces in the Philip- Factors which made it difficult for the
pines, and even these had been erased with Signal Corps to reach its self-set training ob-
the fall of Bataan in April. Training de- jective were no less compelling because
mands were arising, however, from factors some applied alike to all other services.
quite apart from activation needs. For ex- Training capacity allotments were based on
ample, new types of equipment under pro- the assumption that troop basis units would
duction and about to come into use be furnished only trained cadres of Signal
necessitated the enrollment of more officers Corps specialists and technicians who would,
and men in advanced electronics courses. in turn, teach the new men received directly
General Colton had urged the Coast Artil- from reception centers.5 Before the end of
lery Corps to send men to be trained in the July, however, Signal Corps training centers
use of the new radar developments and, had supplied entire complements of Signal
upon finding that the Coast Artillery Corps men—618 officers, 24 warrant offi-
planned to send only six, had said: "I think cers, and 11,120 enlisted men in all—for
you had better make arrangements on units hurriedly added to the 1942 troop basis
the basis of the number being increased, or activated outside its provisions for im-
because of course they will want more than mediate dispatch overseas with task forces.6
six, but they don't know it yet."3 Upkeep A survey of twenty-eight units organized
and maintenance of equipment in the hands in the early summer showed the average
of troops posed additional training prob- time between activation and alert for move-
lems. General Olmstead sought to learn ment to be less than a month. In one ex-
whether using arms were making satisfac- traordinary case, movement orders for the
tory progress in first echelon repair; whether 811 th Signal Port Service Company were
the Signal Corps should provide repair units issued four days ahead of its activation or-
in division signal companies; and what ders.7 Obviously, this did not permit units
should be done about training depot troops 5
in repair, especially of airborne equipment OCSigO R&W Action 1, Capt F. R. Franzoni
for Lt Col Francis H. Lanahan, Jr., War Plans
in the hands of troops.4 Paradoxically, the Div OCSigO, 3 Apr 42, sub: Cadres to provide
shortening of technical courses also created complete tng of all pers within the unit. SigC 320.2
a demand for more training facilities. By Activation of Units, Jan-Jun 42.
6
Brig. Gen. Idwal H. Edwards, Assistant Chief of
this time all courses had been abbreviated Staff, G-3, War Department General Staff, ac-
to the point where they produced soldiers knowledged that the troop basis was "a little cock-
skilled in only a segment of a subject. Thus eyed," but pointed out that there was no better
guess. (1) Recorded telephone conversation, Col
several men might be required to perform a King with Gen Edwards, 1 Jun 42. SigC 352 OCS
job which could have been done by a single 1942-44. (2) Memo, Milliken for Opns Div
soldier thoroughly trained in all aspects of WDGS, 29 Jul 42, sub: Expansion of SigC RTC
and SigC school facilities. SigC 381 Preparation
the work. The time saved by shortening the for War. SigC MT-182.
7
(1) Memo, Milliken [OCSigO] for Dir of Tng
3
OCSigO R&W Action 1, Colton to Radar and SOS, 19 Aug 42, sub: Orgns to be filled 100 per-
Air Com Div, 27 May 42, sub: Tng of CA soldiers cent from RTCs and schools; (2) Memo, Lt Col S.
at Western Electric School. SigC SPSTP 33. M. Thomas, OCSigO, for Dir of Sig Opns Sv
4
Memo, Olmstead for Milliken and Crawford, 27 OCSigO, 22 Jul 42, sub: 811th Sig Port Sv Co.
Mar 42. SigC SPSTP 33. SigC SPSMT-12 War Plans Br.
188 THE SIGNAL CORPS
to draw men from reception centers and mine the extent of facilities available for the
train them to be even simple signal techni- purpose, only to be told later that the AAF
cians. The burden of supplying trained men would do its own training.9
therefore devolved more heavily upon the Where Tables of Organization existed at
Signal Corps replacement training centers all, they were unrealistic for both air and
and schools than General Staff or even Sig- ground units.10 Several new tables, ready for
nal Corps planning had contemplated. With issue at the beginning of June, indicated
little co-ordination of the outside elements strengths greater than those authorized for
affecting training, it was scarcely to be ex- such units at that time, but the War Depart-
pected that the training program would ment had announced no policy for bringing
mesh smoothly with troop activations. Yet existing units to the new strength. It was
commanders who were already carrying small comfort to a unit commander to be
heavy combat responsibilities saw no reason told that his efficiency might be measured by
why they should be expected to train their the manner in which he employed the per-
communications specialists, whatever the sonnel in a table of organization when he
regulations said. Commenting on the train- had been unable to get the men.11 There was
ing of Signal Corps men received in the Eu- little more comfort in the knowledge that
ropean theater in the summer, Lt. Col. when such units were alerted for overseas
Francis E. Kidwell, at Allied Force Head- movement, commanders would expect the
quarters, said that as far as he could judge specialists allowed in the tables even though
"there was nothing wrong with communi- Signal Corps training capacity had not been
cations training, except that the men in the authorized with the new strength in mind.
signal aviation units in Europe had had Tables covering schools and replacement
none of it."8 training centers had been rescinded before
The most pressing training project, and Pearl Harbor and the Signal Corps there-
one of the most vexing, was that of prepar-
ing men to serve with the Army Air Forces. 9
(1) Memo, Chief of Mil Pers Div OCSigO for
It was still difficult to get information as to CSigO, 8 Jul 42, sub: Responsibilities, Hq AAF;
(2) Memo, Lattin for Milliken, n.d., sub: Necessity
the specialists the AAF would need because for SigC Sec on staff of CG AAF. SigC SPSTP 6.
many air units had not yet settled into stand- (3) Memo for File, Lattin, 11 June 42. SigC 353
ard types, and there was little co-ordination Gen 14, Jun 42.
10
See above, pp. 35fT. For example, T/O's in-
within the Air Forces of its requirements for cluded no repairmen for very high frequency equip-
communications men. Instead, there was a ment. It was August 1942 before a course to train
them was instituted in the Signal Corps School at
disposition to operate independently of the
Fort Monmouth and at the Signal Corps Radar
Signal Corps. For example in July, upon re- School, Camp Murphy, Florida. (1) 2d Ind,
ceiving informal notice that it would be re- OCSigO to Comdt ESCS, Ft. Monmouth, 13 Aug
42. SigC SPSMT 352 SCS Ft. Monmouth (7-21-
quired to train 45,000 radio operators for 4 2 ) . (2) OCSigO R&W Action 1, Lattin to Mil
the Army Air Forces, the Signal Corps im- Pers Div, 19 Aug 42, sub: Tng schedule, Eastern
SigC School. SigC 353 Ft. Monmouth 2 (RTC)
mediately initiated a wide survey to deter- May-Aug 42. (3) Memo, Milliken for Exec Con-
trol Div, 17 Jul 42, sub: Weekly Prog Rpt. Weekly
8
Ltr, Lt Col Stuart K. Baker, OCSigO, to Dir Achievement Rpts, 15 Jun-16 Jul 42. SigC Central
of Planning OCSigO, 16 Jul 42, sub: SigC matters Files.
11
for investigation and rpt—BOLERO. SigC 319.1 Signal Corps Information Letter, No. 7 (1 Jun
Inspec Rpts 3. 4 2 ) , pp. 4Iff.
SIGNAL SCHOOLING 189
fore had to defend each need for instructors, Replacement Training Center in Missouri,
and usually got fewer than it had asked for. although it had been in operation less than
Then the only men available were likely to four months. By the middle of June 1942
be recent graduates of the courses they were the whole area of Camp Crowder, overrun
called upon to teach. Moreover, men capa- by men in khaki, hummed with activity;
ble of teaching were the sort in demand 352 new buildings stood on the post, but
everywhere. Filling one gap created an- that was not enough and more wartime con-
other. struction was going up. Already the Signal
There was also the difficulty of getting Corps, not the sole occupant of the camp,
the training equipment needed when there needed elbow room. The Army Ground
was not enough coming off the production Forces still retained housing for 4,300 En-
lines to supply combat requirements.12 The gineer troops. In April General Milliken had
lack of training equipment plagued all com- pointed out that joint use of the facilities
munications instructors for many months. by the Signal Corps and the four Engi-
It was difficulties of this sort which beset neer regiments to be activated in early
the military training program. The faults summer would not serve the training pur-
and the failures lay not so much in the poses of either service. But Col. Walter L.
classroom as at planning levels, in the ele- Weible, Deputy Director of Training of the
ment of time, and in the general unreadi- Services of Supply, had declined to reserve
ness of the nation for war. In the summer the area exclusively for the Signal Corps
of 1942, with plans in the making for a and had insisted upon "equitable use" of
large offensive operation in North Africa, certain of its facilities by both services. On
the immediate concern of the Signal Corps 10 June General Olmstead again opened
was the technical training of the thousands the subject, asking that when the Engineer
of recruits pouring into its replacement regiments should have completed their
training centers at Fort Monmouth, at training cycle, Camp Crowder be assigned
Camp Crowder, and soon at Camp Koh- wholly to the Signal Corps for use as a
ler; the development of qualities of lead- "large Signal Corps training center." It was
ership in the candidates enrolled in the already that.13
Signal Corps Officer Candidate School at By the end of June over 10,000 tech-
Fort Monmouth; and the technical training nicians had gone out from Crowder to
of officers and enlisted men for the Aircraft troop units; more than 12,000 were still
Warning Service at Camp Murphy. studying in the replacement training cen-
ter; about 2,000 men had been sent to ci-
Camp Crowder
270-B, with 1st Ind, CO SigC Radar Lab, to
The largest concentration of Signal CSigO, 11 Apr 42. SigC MT-413.44 Radio Equip.
MT-198.
Corps recruits was at the Camp Crowder 13
(1) Memo, Milliken for Dir of Tng SOS, 20
Apr 42, sub: Expansion of SigC activities at Camp
12
(1) OCSigO R&W Action 7, Lt Col Victor A. Crowder, and 1st Ind, Hq SOS to CSigO, 6 May
Conrad, AFT Com Div OCSigO, to S&I Div, 18 42; (2) Ltr, Olmstead to CG AGF through CofE
Mar 42, sub: Spare parts and components of SCR- and CG SOS, 10 Jun 42, sub: Utilization of Camp
268, 270, 271 sets for school training; (2) Ltr, Crowder for tng of SigC pers and SigC units only.
CSigO to CO SigC Radar Lab, Camp Evans, N. J., SigC 353 Camp Crowder 1, Jan-Apr 42 and 2,
6 Apr 42, sub: Shipment of spare parts for SCR- May-Jul 42.
190 THE SIGNAL CORPS
vilian schools and another 2,000 to the Sig- first contingents in February had floundered
nal Corps School at Fort Monmouth for in mud or slipped about on the ice, but in
specialist instruction. The aircraft warning these summer days "Red Hot and Dusty"
course alone had turned out 1,548 plotters. was the name they gave the camp.
By mid-July more than 32,400 recruits had The recruits streaming into Camp
14
been received. The RTC had passed Crowder to be converted into signalmen
through its shakedown period and was on found few distractions. The nearest town,
a firm footing when, on 1 July 1942, Gen- Neosho, had a population of only 5,000. It
eral Rumbough, who had been in com- had been the Confederate capital of Mis-
mand since its beginning, left and turned souri and now it was a strict Mennonite
the command over to Col. Robert A. Wil- community. Many of the houses had two
lard, another Regular Army Signal Corps doors, side by side—one for weekdays and
officer. Willard had served as executive of- the other for Sundays. It was a dry town
ficer of the RTC since his arrival from Fort to the extent that liquor could be purchased
Monmouth in the preceding December and only in packages, and drier than that in at-
was well acquainted with the problems. titude. But this caused little dissatisfaction.
Rumbough soon became the signal officer Although camp punishment for drunken-
of the great force building up in the United ness was severe, commanders had need to
Kingdom, intended to take a million men mete out little of it. "No nonsense in Neo-
across the Atlantic in the next six months.15 sho" was the soldiers' slogan for the town.
Camp Crowder was a veritable boom What the nearby community offered the
town sprung out of the wilderness in New- recruit was not important, for what Crow-
ton County, Missouri. Its area was com- der demanded left him little time to enjoy
puted in miles, not acres—seventy-five outside distractions. The three weeks of
square miles in traditional guerrilla country, basic training in Signal Corps'replacement
the scene of some of the raids of the desper- training centers was much the same as that
ado Jesse James and his gang. The com- given recruits at any post. It was the course
mander, Maj. Gen. Walter E. Prosser, called prescribed by the War Department to ef-
it the layout of his dreams. The reserva- fect a man's transition from civilian life to
tion did, indeed, provide a wide variety of military routine; much of it was strenuous
facilities for simulating battle conditions, physical conditioning. On his arrival, the
even deserted farm buildings which were recruit was given a few tests and orienta-
utilized as command posts and signal cen- tion lectures and this curriculum: drill;
ters in real combat fashion. Wide, rolling equipment, clothing, and tent pitching; first
aid; defense against chemical attack; ar-
fields, green with grass until the heat seared
ticles of war; basic signal communication;
them brown, steep cliffs, rivers, and dense
interior guard duty; military discipline; and
woods constituted the theater for combat
rifle marksmanship. No effort was made in
training. Recruits who had come with the
the early summer to qualify men in marks-
14
(1) CSigO, Annual Report, 1942, p. 168. (2)
manship at either Camp Crowder or Fort
Signal Corps Information Letter, No. 9 (1 Aug Monmouth. Each post had only 400 rifles,
42), pp. 15-16. all of the period of World War I, and nei-
15
Notes for Conf on BOLERO, 3 Jun 42. SigC ET
322 BOLERO-—Col Rives, 1942. ther had any carbines, the approved Sig-
SIGNAL SCHOOLING 191
nal Corps weapon. Toward the end of the capacity of 800 men, but there was no stress
year, however, and with no increase in on filling this course because most of the
arms, over 80 percent of the men in the men assigned would be recruits without the
RTC had qualified in marksmanship and mental ability or aptitude for signal train-
the percentage was almost as high at Fort ing, who would be shipped out as basics at
Monmouth.16 its end. In the 8-week aircraft warning
The recruit found that to be a lineman plotter course, with a capacity of 400 per
he had to be six feet tall, and that if he lost cycle, the primary phase emphasized map-
his grip and slid down the pole, he picked reading, aircraft identification, organiza-
up splinters all the way. He discovered that tion, and information center personnel
no man with a marked accent was eligible matters. The combined phase taught dis-
for switchboard duty, no matter how apt cipline in all message center functions; and
he might be at operating the contraption. in the final phase the student practiced on
Probably the most demanding thing he real field sets, rotating from position to posi-
learned was to live peacefully with his fel- tion. The 9-week courses were for personnel
lowmen. Army training was the welding to- and supply clerks, truck drivers, and typists,
gether of men from every walk of life into with the allotment of men totaling 2,300.
a common pattern of behavior which bore A man acquiring a speed of 30 words per
little resemblance to most peacetime experi- minute in 30 hours of instruction in the
ence. typing course was eligible for teletypewriter
Unlike basic military training, more or instruction. The 11-week cycle included
less uniform throughout the Army, the tech- courses for message center clerks, linemen,
nical courses at Camp Crowder were related
messengers, telegraph printer operators, and
closely to the communications duties of the
local battery telephone switchboard opera-
Signal Corps. The curriculum was substan-
tors, and could accommodate 1,705 stu-
tially the same as at Fort Monmouth. The dents. The 13-week courses, with 5,395 men
manuals and textbooks used were those pre- assigned, were for automobile mechanics,
pared at the eastern school and at least a cooks, pole linemen, common-battery
nucleus of the training staff had come from switchboard operators, pigeoneers, and
Fort Monmouth. Camp Crowder was the slow-speed radio operators.
heir to Fort Monmouth's training experi- Thus, almost half of the total enrollment
ence, although far from an identical copy at Crowder was in the 13-week courses.
of the eastern post. And of that group 3,000 were in the course
The schedule in effect at the Camp for radio operators. Some of these would
Crowder Replacement Training Center on later receive additional instruction in high-
1 July provided for the concurrent train- speed or fixed-station operating. The first
ing of between 13,000 and 14,000 men in weeks of the radio operator course were de-
6- to 13-week cycles, which included the voted to sending and receiving International
time devoted to basic military instruction Morse code, and to studying radio proce-
and processing. The 6-week cycle had a dure and radio circuits. After that the stu-
16
Memo, Milliken for Exec Officer OCSigO, 17
dents worked a month in the field with
Nov 42. SigC SPSTP 474 Gen (Small Arms). simulated tactical nets, and climaxed their
TRAINING AT CAMP CROWDER. Basic infantry instruction (exemplified above) and
field radio operation (below).
TRAINING AT CAMP CROWDER. Cable splicing (above) and message center opera-
tion (below).
264-211 O - 78 - 14
194 THE SIGNAL CORPS
training with a week of operating vehicular With his executive, Lt. Col. Edward A.
radio sets in the Ozark Mountains.17 Allen, General Prosser had devoted much
About 2,600 of the better qualified basics time and energy to planning. Lt. Col. Paul
were assigned to a Signal Corps school or a L. Neal could not be relieved of his duties
civilian institution for specialist training of as director of the Officers' Department of
a higher order. Until 1 July Camp Crowder the Monmouth school until June, in order
had not been able to give advanced special- to become assistant commandant. Until
ist instruction, but on that date the Mid- that time Maj. R. G. Swift, who had come
western Signal Corps School, an institution from the Wire Division of the Enlisted
similar to the original Signal Corps School Men's Department at Monmouth, acted in
20
at Fort Monmouth, opened its doors to the his stead. The order activating the school
first 400 students from the RTC. There- had failed to exempt it from corps area
after the only students the RTC sent regu- control, and although General Prosser had
larly to Fort Monmouth were those for the been designated to command the institu-
cable splicer and telegraph printer mainte- tion, it was officially under the jurisdiction
nance courses for which Crowder as yet had of the post commander, an Infantry col-
no training equipment. onel. The lines of authority were untangled
The Camp Crowder school was the out- late in May when the school and the 800th
growth of plans laid months before the RTC Signal Service Regiment, activated to ad-
had opened.18 It had been obvious even then minister the instructors and students of the
that the single Signal Corps School at Fort school, were declared exempt units under
21
Monmouth could not long provide special- the control of the Chief Signal Officer.
ist training for the increased intake of re- On the opening of the school, the scar-
cruits. On the last day of December 1941 city of instructors was the number one prob-
the Signal Corps had laid a concrete plan lem, and in mid-July a recruiting party, in-
for the school, with a capacity of 2,500 cluding a Civil Service representative from
(1,450 had originally been contemplated), St. Louis, started out to find 142 civilians
before the G-3 Section of the War Depart- capable of teaching communications sub-
ment General Staff. A month later the War jects. The National Education Association
Department had authorized its establish- lent its assistance while the press and radio
ment. Before the school opened, its capacity broadcasters gave publicity to the need.22
had been raised to 6,000 and the additional 20
Col Robert G. Swift, "The Crowder Story,"
construction entailed had been authorized, Signals, 11:2 (November-December, 1947), 25.
21
although the buildings had yet to be put (1) Notes taken at conference between Milli-
ken and Neal, 12 May 42 (unsigned) ; (2) Memo,
up.19 CSigO for Dir of Tng SOS, 12 May 42, and 1st
Memo Ind, Deputy Dir of Tng SOS for CG Sev-
17"
Incl 1, Training Schedule, 9 June 1942, to enth Corps Area, 21 May 42. SigC 353 Camp
Ltr, CSigO to CO SCRTC, Camp Crowder, 13 Crowder 2, May-Jul 42. The Army Ground Forces,
Jun 42. sub: Prescribed tng of SigC specialists at the Army Air Forces, and the Services of Supply
SigC RTC, Camp Crowder. SigC 353 Camp Crow- agreed to avoid duplicate training facilities as much
der 2, May-Jul 42. as possible.
18 22
Activated 25 March 1942 as the Signal Corps (1) Memo, CSigO for Comdt MWSCS, 15 Jul
School, the institution was redesignated the Mid- 42, sub: Recruiting for civ tech instructors for
western Signal Corps School on 3 June 1942. SigC school: (2) Ltr, Jesse D. Myers, U.S. CSC to
Later, it became the Central Signal Corps School. Col C. J. McIntyre, Chief of Spec Activities Br
19
CSigO, Annual Report, 1942, p. 4. OCSigO, 15 Jul 42; (3) Ltr, Lt Col E. M. Kirby,
SIGNAL SCHOOLING 195
Although the new school drew heavily on The RTC, main source of students for the
the experience of the older institution at school, was still receiving many men not
Fort Monmouth, it was not restricted to the qualified for signal training. The Inspector
training patterns established there. An early General's Department, following an inspec-
innovation was the Common Subjects Di- tion of Camp Crowder, had supported the
vision, in which all new students except ra- Chief Signal Officer in his efforts to get men
dio operators were instructed in basic shop of higher intelligence. But the Commanding
work and the principles of electricity before General, Services of Supply, had rejected all
undertaking the specialist courses.23 When proposals to this end because Signal Corps
facilities should be available to accommo- replacement training centers were then al-
date the full number authorized, it was ready receiving a higher average of Grade I,
planned to divide student strength between II, and III recruits by 4.15, 4.66, and .56
the school's three departments: 2,705 to the percent, respectively, than were the other
13-week wire courses; 2,625 to the 17-week technical services.26
radio courses; and 670 to the 20-week air- G-1 of the General Staff had informally
craft warning courses. Meanwhile, two promised that men for the Signal Corps'
shifts were employed in order to utilize fully replacement training centers would be
the scarce training equipment and the lim- drawn, as far as possible, from the northeast,
ited classroom space.24 north central, and Pacific coast reception
The combined output of Camp Crowder centers, in areas where the general level of
and Fort Monmouth was still not enough to education was higher. But an examination
meet the requirements for skilled commu- of the records of 338 recruits received at
nications men. There was a critical scarcity Camp Crowder on two days in midsummer
of radio and radar repairmen, high-speed revealed that they had come from Fort Bliss,
radio operators, and telegraph printer in- Texas, and that fewer than one percent were
staller-repairmen, to name but a few of the college men; about 17 percent were high
categories in short supply. The Chief Sig- school graduates; 45 percent had completed
nal Officer directed that these critical grade school or had had "some schooling."
courses be filled; if men meeting the stand- Over 36 percent were illiterates. Most of the
ards for this type of training were not avail- last were of Mexican descent and were un-
able, then those who showed any promise of able to speak English.27
making acceptable students would be en- Despite the dearth of qualified students,
25
rolled. before the school had been in operation a
full month the commandant had received
Chief of Radio Br, Bureau of Public Relations WD, orders to activate the second priority ele-
to McIntyre, 22 Jul 42, sub: Civ instructors for
Camp Crowder. SigC 353 Camp Crowder 2, May- ments of the 850th Signal Service Battalion,
Jul 42. the 209th Signal Depot Company, and the
23
Swift, "The Crowder Story," Signals, II, 24 ff.
24
(1) Memo for File (unsigned), 3 Jul 42, sub:
183d Signal Repair Company for duty with
Equip MWSCS. SigC SPSMT 353 Camp Crowder.
26
(2) Central Signal Corps School Annual Report, IGs Dept Spec Inspec Rpt, SCRTC, Camp
1942. Crowder, 8 May 42. SigC Special Inspec File.
25 27
Ltr, CSigO to CO SCRTC, Camp Crowder, 26 Memo, Milliken for Dir of Tng SOS, 14 Aug
May 42, sub: Filling to capacity critical courses of 42, sub: Classification rcds of inductees at Ft.
instruction. SigC 353 Camp Crowder 2, May-Jul 42. Bliss, Texas. SigC 353 Camp Crowder.
196 THE SIGNAL CORPS
the North African Service Command. Thus three practically independent projects, Gen-
at Camp Crowder, as at Fort Monmouth, eral Prosser saw the need for a single super-
calls for technicians and specialists would visory staff agency which would represent
not await their production, and the men the Chief Signal Officer in administering
would lack instruction and practice in team- and co-ordinating all training activities. Ac-
work. And signal training, unless it devel- cordingly he sent a second recommendation
oped teamwork as well as individual skill, to Washington on 30 June, proposing the
would be effort wasted on the forging of establishment of such an agency, the Mid-
29
strong links for a chain which, unlinked, western Signal Corps Training Center.
would be no chain at all. In the meantime, types of organizations to
More and more signalmen were working carry out the missions of these already active
in small units on highly specialized proj- but as yet unauthorized agencies evolved
ects where the success of their operations de- through trial and error, and Camp
pended upon their ability to work success- Crowder, like Fort Monmouth, began to
fully together. Too often the new soldier feel the pinch of crowding as it reached the
was catapulted into combat without any ex- limits of its training capacity.
perience in the duties which he would per-
form as a member of such a group, because Camp Kohler
early in the war emphasis was on the train-
ing of the individual soldier. At Camp In June 1942 the Signal Corps had a
Crowder there were sixteen tactical units, training capacity for about 20,000 men at
Signal Corps troops administered by the its two replacement training centers—
Second Army all badly in need of tech- 14,000 at Crowder and 6,000 at Fort Mon-
nical instruction in teamwork, which the mouth. Allowing for differences in the 6-
replacement training center and school were to 13-week training cycles of the various
not set up to give. To meet the needs of courses, the Signal Corps estimated that it
these and other units at a similar stage of could produce some 58,000 technicians in
training, General Prosser proposed to es- the two centers by the end of the year. But
tablish a unit training center at Camp that figure still fell 12,000 short of meeting
Crowder, and General Olmstead heartily the Army's already computed requirements
28
indorsed his proposal. Not waiting for War for 70,000 signalmen.30 There was no
Department approval, Prosser straightway room for further expansion of the Fort
organized the new activity as a subsidiary Monmouth center, and any expansion at
of the Midwestern Signal Corps School, Camp Crowder would first necessitate ad-
placing Col. James Lawrence in command. ditional construction. A third replacement
He then sought recognition of it as an or- training center, Camp Kohler, near Sacra-
ganization separate from the school. mento, California, was therefore created.31
With Camp Crowder now comprising
29
Ltr, Comdt MWSCS Camp Crowder to CSigO,
28
(1) Memo, Gen Edwards, ACofS G-3, for 30 Jun 42. SigC 353 Camp Crowder 2, May-Jul 42.
30
CG's AGF, AAF, and SOS, 30 May 42, sub: Re- Ltr, CSigO to CG SOS, 19 Jun 42. SigC 353
sponsibility for tng. SigC 353 Fort Monmouth 2 Camp Crowder 2, May-Jul 42.
31
(RTC) May-Aug 42; (2) Ltr, Milliken to Pros- Named for 1st Lt. Frederick L. Kohler, of Oak-
ser, 1 Jul 42. SigC 353 Camp Crowder 2, May- land, California, who had been killed in action in
Jul 42. March while serving with General Stilwell's Mili-
SIGNAL SCHOOLING 197
The Walerga Collection Center, about Fort Monmouth
twelve miles northeast of Sacramento, ap-
peared to be the most appropriate site avail- The newer training centers at Camp
able. It had space for 5,000 men and it Crowder, at Camp Kohler, and at still an-
could be made available quickly, having other new project, Camp Murphy, had each
been vacated recently by the transfer inland been organized for a specific type of train-
of the Japanese-Americans concentrated ing, but Fort Monmouth remained many-
there on the outbreak of war. It seemingly sided. It had been the Signal Corps' prov-
met General Olmstead's specifications for ing ground for both officer and enlisted
an existing facility on the west coast which schooling. Until the newer training centers
could be in readiness to receive recruits were ready to accept students, Fort Mon-
within a month. On 2 July the War De- mouth had to carry the burden of a wide
partment authorized its acquisition, cau- variety of courses. By the summer of 1942
tioning the Signal Corps at the same time Monmouth was reverting to its original mis-
that the proposed center would be only a sion of producing wire and radio specialists.
temporary expedient. Either it must be dis- Radar training was being established at
continued by 31 December or the capacity Camp Murphy. Photographic training had
of the other replacement training centers been concentrated at the Signal Corps Pho-
must be reduced accordingly.32 tographic Center at Astoria, Long Island.34
The Signal Corps took possession on 8 The exodus of the RTC from the New
July, but the plan for quickly getting 5,000 Jersey post was well under way. Basic mil-
men under training at Camp Kohler did itary training was concentrated at Camp
not work out as contemplated. It soon be- Edison, where the recruit found no open
came apparent that although there was countryside such as greeted men sent to
housing for that number, the sanitary and Camp Crowder. On the contrary, the New
hospital facilities were adequate for no Jersey community teemed with civilian
more than 2,000. The initial capacity was workers and with the families of men in
therefore set at that figure, pending the the nearby camps. The technician classes
additional construction which would be re- of the RTC also had begun to move away
quired here as at other training centers. It from the post proper to Camp Charles
35
was decided to limit training to the basic Wood, at nearby Eatontown, New Jersey.
courses and to send the qualified men on to Monmouth developed most of the train-
Camp Crowder for technical instruction. As
yet there was no provision at Camp Kohler 5 Sep 42, sub: Prescribed quotas for tng of SigC
specs, Camp Crowder. SigC SPSMT 353 RTC
for a target range, obstacle course, parade Camp Crowder. (2) Memo, CSigO for Dir of Tng,
ground, or gas chamber to give reality to SOS, 18 Aug 42, sub: Tng aids for new SigC RTC,
basic training, and like Fort Monmouth, the Camp Kohler. SigC 353 RTC Sacramento, Calif.
34
Signal Corps Information Letter, No. 7 (1
new camp was located in a populous area.33 June 1942), p. 52.
35
Camp Charles Wood was officially inaugurated
tary Mission to China. (1) CSigO, Annual Report, 14 July 1942 and named in honor of Lt. Col.
1943, p. 360. (2) Signal Corps Information Let- Charles Wesley Wood, a Signal Corps Regular
ter, No. 13 (1 December 1942). Army officer who had retired in 1937 because of
32
Memo, Edwards for CG SOS, 2 Jul 42. OCS illness but who had been recalled to active duty in
WDGOT 600.12 (6-19-42). 1940 and had died 1 June 1942. Signal Corps
33
(1) Ltr, CSigO to CO SCRTC Camp Crowder, Information Letter, No. 9 (1 August 1942), p. 34.
198 THE SIGNAL CORPS
ing procedures and training doctrine used month's training in testing and repairing
throughout the Signal Corps' training insti- field equipment of commercial design. In
tutions. The methods of teaching in the the fixed-station radio operator course, open
Signal Corps School and in the RTC were only to those who had attained a receiving
similar; the curriculum of the RTC was speed of 15 words per minute in Interna-
limited to the simpler technical subjects, tional Morse code, students were taught
while the school conducted the more diffi- high-speed Morse transmitting and how to
cult courses. To a great extent the stu- read and transcribe messages from ink-
dents were self-taught. They studied and recorded tape at a typing speed of 35 words
took quizzes on mimeographed information per minute. Teletypewriter operators stud-
sheets. Periodic examinations made sure ied, among other things, the new Army-
that students did not lag behind the steady Navy Civil Aeronautics procedures which
pace required. had been issued in May. There were a hun-
Films and film strips were used widely. dred things that could go wrong with a tele-
Components of equipment were displayed typewriter machine; a student in the mainte-
on breadboards or were reproduced on a nance course had to learn to break down,
large scale.36 There were telephone circuits reassemble, and adjust its complicated
to be dismantled and rebuilt by students in mechanism.38
the wire courses, Linemen learned trouble Monmouth's training administrators en-
shooting from an ingenious device—a model deavored to keep methods of instruction as
city with complete dial telephone circuits up to date and training doctrine as progres-
and a central exchange. By throwing any sive as the new developments in warfare.
one of a large number of switches, unseen To this end, for the teaching of radio opera-
by the student, the instructor could cause a tors, the faculty introduced a code learning
breakdown for the student to locate and and touch typing system developed by Dr.
correct.37 A diorama for teaching blinker Fred Keller, a Columbia University psy-
lights, accurately drawn to scale and taking chologist. It divided the alphabet and the
into account the factor of distance, was the ten cardinal numbers into five groups, ac-
work of Maj. Reuben Abramowitz, who cording to their positions on the keyboard
had been an enlisted instructor in the Sig- of a typewriter, and the student mastered
nal Corps School before the war. Many the characters for each group before pro-
other training aids used at Monmouth and ceeding to the next. The use of phonograph
elsewhere were the developments of in- records for the reproduction of the charac-
structors forced to improvise when equip- ters and their phonetic equivalents, which
ment was unobtainable. were played on turntables in a master con-
In the radio maintenance course a student trol room and piped through switchboards
to the headsets of the individual students,
was taught radio theory, then given a
made it possible for 140 men to work simul-
36
A breadboard display of electronic circuits pre- taneously without mutual interference. It
sents the wiring and components spread out over a was too early to estimate the system's value
flat surface, so that a novice can readily see the
38
connections, trace individual wires, and study the Ltr, CSigO to CG SCRTC Ft. Monmouth, 14
assembly. May 42, sub: Amplified instruction of teletype-
37
CSigO, Annual Report, 1942, pp. 148, 150, writer operators. SigC 353 Ft. Monmouth 2 (RTC)
153. May-Aug 42.
SIGNAL SCHOOLING 199
39
as a training aid, but it showed promise. wire, because in maneuvers the criticism was
Monmouth's instructors visited troops in heard frequently that signal troops did not
maneuver areas, observing divisional train- keep field wire out of traffic lanes. New
ing methods and needs.40 They studied the training films on laying field wire neglected
communications requirements of new types to give this point any weight, nor did train-
of units and of new commands to determine ing literature stress it sufficiently.43
what should be added to technical courses: In July the Enlisted Men's Department of
for example, the communications tactics the Signal Corps School added two new
and techniques to be applied in landing courses: repeater-carrier and very high fre-
operations. quency. The RTC inaugurated an instruc-
Training administrators in Washington tors' training course to replace the officer
co-operated to keep instructions up to date.
candidate preparatory and first sergeants'
They interviewed many observers returning
courses, and established a Training Stand-
from overseas, and when they learned of
ards and Service Division to consider and
combat developments which might have a
recommend means for raising efficiency.
bearing on training doctrine or methods,
Among the earliest achievements was the
they arranged for these officers to visit Fort
development of the text, "Training of the
Monmouth and acquaint the faculty with
Army Instructor." The instructors' course
them.41
consisted of about nine weeks of specialty
In the early summer of 1942 Washington
training and four weeks of instruction
and Monmouth considered the advisability
in leadership and company administration.44
of adding rapid-pole-line construction
The most serious weakness in teaching
(RPL) to the curriculum of the RTC.
was the inexperience of most of the instruc-
While the Signal Corps weighed the merits
tors. Even the few experienced mentors
of establishing such a course, the General lacked firsthand information of the unusual
Staff explored the pros and cons of making
demands made on signal troops in theaters
additional troops available to institute the
of war. All plans for returning officers or en-
new technique.42 Thus one action hinged on
listed men from overseas in order to utilize
another. General Milliken urged that train-
their experience in training had failed be-
ing emphasize the proper laying of field
43
39
Ltrs, CSigO to CG SCRTCs Ft. Monmouth
History of Eastern Signal Corps Training Cen- and Camp Crowder, 9 Apr 42, sub: Tng directive
ter, 30 Oct 43, p. 42. SigC Control Approval Sym- with reference to keeping fld wire out of traffic lanes.
bol SPSEO-100. SigC 353 Gen 13, Apr-Mav 42.
40
Ltr, Comdt SigC School to CSigO, 8 Jul 42, 44
The officer candidate preparatory course had
sub: Visit of instructors to divs, with 2 Inds. SigC been established pursuant to War Department Cir-
353 Ft. Monmouth 2 (RTC) May-Aug 42. cular 48, 19 February 1942; the first sergeants'
41
Memo, Gen Code, Deputy CSigO, for Sig Opns course, officially inaugurated on 6 April 1942, had
Sv, 19 July 42, sub: Assistance to instruction staffs been initiated months before by General Stoner.
at Ft. Monmouth. SigC 352 Ft. Monmouth 2, Jun- (1) Signal Corps Information Letter, No. 9, (1
Dec 42. Aug 4 2 ) , p. 32. (2) Ltr, Milliken to Comdt ESCS
42
OCSigO R&W Actions 1 to 10, between C&E Ft. Monmouth, 13 Jun 42, sub: Officer candidate
Div, Mil Tng Div, Opns Div, War Plans Div, Com preparatory school. SigC 352 Ft. Monmouth 2, Jun-
Coord Br OCSigO, 19 Feb 42 through 22 May 42, Dec 42. (3) Ltr, Col Clewell, SCRTC Ft. Mon-
sub: Instruction in cross frame semipermanent const mouth, to Col. Lattin, OCSigO, 30 Jul 42. SigC
at SCRTC Ft. Monmouth. SigC 676.1 Gen 12. 353 Ft. Monmouth 2 (RTC) May-Aug 42.
200 THE SIGNAL CORPS
cause commanders had too few specialists to put all of the men with low scores into the
45
release. classes for linemen and truck drivers, and
There were formidable shortages in many he insisted that both of the RTC's give re-
categories of signal specialists. In June the cruits in classification Grades IV and V a
RTC at Fort Monmouth was assigning 60 chance to learn a wide range of the simpler
percent of the incoming recruits to courses skills. On the other hand, Colonel Lattin,
in the school at the end of basic training, in the same office, cautioned that require-
as compared with 40 percent in March, and ments for more than 13,000 drivers for light
was assigning another 6 percent to be trucks alone indicated that more men, not
trained as oscilloscope operators in the Air- fewer, should be trained as truck drivers.
craft Warning Department. This repre- Word from Lt. Gen. Dwight D. Eisenhower
sented about 85 percent in the first three added weight to this belief.48
classification grades.46 Computations of re- At both Fort Monmouth and Camp
quirements were increasingly calling for Crowder, the RTC's singled out promising
men possessing unusual skills, such, for ex- recruits to be message center clerks and
ample, as would be needed for the new ra- code clerks. Many were accepted for the
dio intercept units and for the Enemy Signal Corps Officer Candidate School
Equipment Identification Service (EEIS) ,47 (OCS), wherefore gaps in the enlisted
By now even simple technicians were be- ranks could be expected to continue until
coming scarce. It was estimated that the the requirements for Signal Corps officers
shortage of watchmen to guard valuable had been met. The shortage of radio
equipment would reach almost 2,000 by the operators was acute. The ability to send and
end of 1942, and of field telephone opera- receive Morse code is a natural gift. It was
tors, almost 1,000. Col. James S. Willis of a waste of time and manpower to attempt
the Military Training Branch felt that the to make radio operators of men who, how-
Fort Monmouth RTC had been prone to ever intelligent, had no aptitude for the
work. Men who attained Army General
45
OCSigO R&W Action 2, Brig Gen Henry L. P. Classification Test scores of 90 to 109 were
King for Chief of Mil Tng Br OCSigO, 24 Dec 42,
sub: Instructors with combat experience. SigC 352 usually able to pass the code aptitude test
Ft. Monmouth 2, Jun-Dec 42.
46
with a score of 50 or better and to develop
The RTC averaged 8.1 percent Class I, 33.5 into good operators. To discover those tal-
percent Class II, and 35.5 percent Class III men.
Of the men admitted over a period of 15 months, ented in this speciality, the Signal Corps
fewer than 5 percent possessed occupational skills therefore urged that reception centers give
in communications, and most of these went into the
school regardless of classification. Ltr, CSigO to the code aptitude test to all recruits in-
CG SCRTC Ft. Monmouth, 26 May 42, sub: Fill- tended for the Signal Corps replacement
ing to capacity critical courses of instruction, and training centers. Reception centers were
1st Ind, Hq SCRTC Ft. Monmouth to CSigO, 24
Jan 42. SigC 353 Ft. Monmouth 2 (RTC) May- 48
Aug 42. (1) OCSigO R&W Action 3, Mil Tng Div to
47
(1) Ltr, CO Equip Coord Br OCSigO to CG Mil Pers Div, 9 Jul 42, sub: Truck drivers and
SOS, 11 Aug 42, sub: Intercept broadcast unit and basics; (2) 1st Ind (without basic), CSigO to CO
1st Ind, Hq SOS to CSigO, 15 Aug 42. SigC 413.44 SCRTC Camp Crowder, 29 Sep 42. SigC SPSMT
No. 1 (RB 2265). (2) OCSigO R&W Action 1, 353 RTC Camp Crowder (9-17-42). (3) Memo,
Stat and Reference Div, to Mil Pers Div, 28 May Stoner for Milliken, 8 Oct 42, sub: Tng of motor
42, sub: EEIS, selection and tng of pers. SigC 353 maint pers. SigC AC 333.1 Trip, Gen Stoner
Gen 13, Apr-May 42. (ETO) Oct 42.
SIGNAL SCHOOLING 201
supplied with commercial recorders which tivities of the Special Services Division. It
could play recordings of Signal Corps code was composed of enlisted clinical teams,
aptitude tests to 250 men at a time. But it each made up of a psychiatrist, a psychiat-
was a slow business getting the equipment ric social worker, and a psychologist, who
49
into use. sought first to uncover the causes of inap-
The caliber of men received from recep- titude, unusual behavior, or mental stress
tion centers for signal training remained a in a recruit and then to correct the situ-
cause for concern in the first half of 1942, ation before it had become serious. Team
although the situation had improved a little workers also interviewed each man absent
after Colonel King broadened the base for without leave for more than twenty-four
selection by lowering the requirements upon hours upon his return to the post. Often it
which the Signal Corps had previously in- was possible to guide a man to an under-
sisted, and by directing that inept recruits standing of his abnormal actions or atti-
be quickly reported and made available for tudes, so that he could work out a satis-
reassignment. His aim was to accelerate the factory adjustment for himself. Failing that,
training of the best men obtainable in order the unit initiated his reassignment or reclas-
"to provide the largest possible number of sification, or some other measure designed
acceptably trained specialists . . . not to utilize his skill and aptitude to better ad-
. . . any smaller number of perfectly vantage. Many of those interviewed were
50
trained individuals." assigned to the Special Training Section of
It was necessary, however, that every the basic school, where the Mental Hygiene
man not entirely incapable of communica- Unit continued to test their progress.
52
tions study be developed to the full of his There came under the ministrations of
ability to learn. To this end the Mental this unit men who were brilliant and valu-
Hygiene Unit,51 organized as a part of the able, but who nevertheless showed mental
Fort Monmouth RTC and duplicated later instability; men who were willing but slow-
at Crowder and Kohler, rendered valuable witted, physically strong but unlearned;
aid. Its primary function was to salvage the men of low mentality; or men who were
men received from reception centers who unable to speak or understand the English
for some reason failed to fit into the life of language. In short, the unit dealt with any
the replacement training center. Attached man unable to fit into the training sched-
to the headquarters of the RTC, the unit ules in a normal way, and many of these it
operated more or less independently, en- saved for the Army. When the Monmouth
tirely separate from the so-called morale ac- unit had been in operation for only six
49
months, a Washington newspaper de-
Memo, Lattin for Tng Div SOS, 15 Aug 42,
sub: Tng SigC pers for Air Corps. ASF 353 Mil clared : "The success of the Fort Monmouth
Tng.
50
clinic has been so noteworthy that the War
Memo, Col King, Actg Chief of Opns Br
OCSigO, for Div Chiefs of Opns Br, 11 Mar 42. Department should establish similar clinics
SigC SPSTP 33.
51 52
Established on 1 January 1942 under the lead- The Special Training Section, organized 26
ership of Maj. Harry L. Freedman, Medical Corps, March 1942, preceded the Special Training Unit,
as the Classification Clinic, the unit was redesig- activated in November 1942, which served the same
nated the Mental Hygiene Unit on 28 October 1942. purpose.
TRAINING AT FORT MONMOUTH. Long lines of men marching to classes, like
those above, were a common sight at Fort Monmouth. Below are signal trainees manning a
mobile message center.
TRAINING AT FORT MONMOUTH. Rifle marksmanship (above) was as much a
part of signal training as was cryptography (below).
204 THE SIGNAL CORPS
elsewhere." 53 The unit's success in develop- course, and the three-month course for
ing latent ability eventually led to the in- Cryptanalyst clerks drew its students from
auguration of similar procedures at all re- the replacement training centers at Fort
placement training centers of the Army. Monmouth and Camp Crowder. Hand-
With aircraft warning, photographic, picked at the end of basic training, those
and pigeon training centered elsewhere, who demonstrated within the first six weeks
Fort Monmouth soon discontinued those of the elementary course that they possessed
courses. In June 1942 it was agreed that a ability and aptitude for the work and who
separate signal intelligence school would be could meet other requirements approxi-
established under the supervision of the Sig- mating those for OCS were immediately
nal Intelligence Service (SIS) at Washing- enrolled in the signal intelligence course.55
ton. At that time the cryptographic courses The elementary course consisted of in-
54
also were discontinued at Monmouth. struction in cryptographic security, army
Fort Hunt, Virginia, virtually abandoned and staff organization from a signal intelli-
to the weeds after World War I, first re- gence viewpoint, elementary and advanced
ceived consideration as the site for the new cryptography, IBM theory and operation,56
school, but instead Arlington Hall, a girls' code compilation, and the preparation of
school in Arlington County, Virginia, was cryptanalytic work sheets. The more ad-
eventually selected and the name remained vanced course also covered security, organi-
as the unofficial designation for the new ac- zation, and elementary and advanced
tivity. cryptography, and in addition language in-
Following Pearl Harbor, students had struction in Japanese, German, Italian,
been withdrawn one by one from the year- French, Spanish, and Portuguese (limited
long Cryptanalysis course at Fort Mon- to the ability to distinguish one tongue from
mouth before they had gained even the another and to recognize the more common
meager knowledge of the highly specialized words), and military Cryptanalysis.57
subject that could be acquired within that The Cryptographic Division, like other
time. The length of the course had then specialist training activities, faced an alarm-
been cut almost in half and the allotment ing shortage of trainable men. Needless to
of students almost doubled. Selected en- say; the men assigned to the highly secret
listed men and officers, including some Air work had to be the sort whose background
Corps officers, were enrolled in the four- and character would indicate loyalty, in-
tegrity, and discretion. A convenient rule of
month Cryptanalyst or signal intelligence
thumb was that a man should be a native
53
(1) Memo 41, Hq ESCRTC, 6 May 43, sub: son of a native son—certainly not anyone
Mental Hygiene Unit. SigC 353 Ft. Monmouth
55
(RTC) 1, Jan-May 43. (2) Capt Frederick Rein- Incl 1, Cryptographic Training at Fort Mon-
stein, Study of Signal Corps Replacement and Filler mouth, to Ltr, Dir of ESCTC Ft. Monmouth to
Training, 1941-1944 (1945), SigC historical mon- Hist Sec Fld Office OCSigO, 23 Feb 44, sub: Hist
ograph C-9, pp. 64, 100. SigC Hist Sec File. (3) of cryptographic school at Ft. Monmouth. SigC
The Washington Post, July 17, 1942. (4) Ltr, Gen Hist Sec File.
56
Code, Deputy CSigO, to Comdt ESCS Ft. Mon- International Business Machines were employed
mouth, 21 Jul 42, sub: Army clinics. SigC 352 Ft. in cryptographic work.
57
Monmouth 2, Jun-Dec 42. (1) Daily Data, Sv School Subsec Mil Tng
54
Daily Data, Mil Tng Div OCSigO, 8 Jun 42. Div OCSigO, 20 Feb 42. SigC Hist Sec Card File.
SigC Hist Sec Card File. (2) SigC Hq Ft. Monmouth File 311.5, passim.
SIGNAL SCHOOLING 205
of known Axis association or even of ex- cially those accepted for the technical serv-
tensive foreign acquaintance. Because of ices. The War Department gave wide
the nature of the work it was desirable that distribution to a circular which said flatly
the man be at least a high school graduate, that "proper attention is not being given
have some competence in mathematics, and to the selection of highly qualified appli-
possess reasonable speed in typing. His eye- cants for the technical services . . ." 62
sight should be good. So should his rating In July the War Department again called
at the bank or with the first sergeant, for a attention to the poor selection of candidates,
man whose credit standing was open to the and urged a canvass of surplus applicants
slightest question was insecure, a man too for the schools of nontechnical arms to de-
vulnerable to be trusted with a secret. In termine their suitability for the technical
every case, before a potential cryptographic services. Examining boards were directed to
student could be assigned, a Military In- encourage qualified applicants to at least
telligence Division clearance was neces- name a technical service as an alternate
sary.58 In July the Signal Corps School was choice.63 The Signal Corps welcomed the
having difficulty in filling its small quota of action, for it had long felt that the selection
125 for this training as well as the quotas practices in vogue drew too heavily from the
for other critical courses.59 In the six months small fraction of the Army which the Signal
following Pearl Harbor the Signal Corps Corps represented, while many enlisted men
School had graduated 3,617 enlisted spe- who were qualified for Signal Corps com-
cialists, 1,293 officer candidates, 779 offi- missions were left in the ranks of other arms.
cers from the company officers' and ad- Drawing officer candidates from within the
vanced officers' courses, 1,287 officers and Signal Corps itself also impoverished the
enlisted men from the aircraft warning Corps in its enlisted specialists. For example,
courses, but none at all from the crypto- the 556th Signal Aircraft Warning Bat-
graphic courses.60 talion in Iceland had sent 26 candidates,
It was the demand for officers that caused about 8 percent of its strength, to OCS by
the greatest expansion and drew the most midsummer.64 Colonel Powell, in the Ha-
attention at Monmouth in the summer of waiian Department, protested that OCS
1942.61 All officer candidate schools were un- and enlisted pilot schools were getting his
der fire that summer, mainly because of the experienced teletype maintenance men in
mediocrity of many candidates, and espe- such numbers as to create a serious shortage
65
there.
58
SigC Hq Ft. Monmouth File 311.5, passim. In the spring of 1942 still another prob-
59
Daily Data, Mil Tng Div OCSigO, 3 Jul 42.
SigC Hist Sec Card File. lem focused the attention of training officers
60
(1) Signal Corps Information Letter, No. 8 on the Signal Corps Officer Candidate
(1 July 1942), p. 26. (2) History of the Eastern
62
Signal Corps Replacement Training Center, 30 Oct WD Cir 187, Sec. II, 13 Jun 42.
63
43, p. 36. Control Approved Symbol SPSEO-100. WD Cir 247, 28 Jul 42.
64
(3) Memo, Deputy Dir of Tng SOS for Dir of 1st Ind, CO 556th AW Bn to CSigO, 11 Aug
Tng SOS, 3 Jul 42, sub: Tng inspec of SCRTC Ft. 42, on Ltr, CSigO to Lt Col Kenneth F. March,
Monmouth. SigC 352 Ft. Monmouth 2, Jun-Dec 14 May 42, sub: Applicants for OCS. SigC 352
42. OCS 2, Apr-May 42.
61 65
Brig Gen W. O. Reeder, "Training at Fort Msg, Sig Officer Hawaiian Dept to CSigO,
Monmouth, World War II," Signals, 1:5 (May- CM-IN 1753, 7 Apr 42. SigC 311.23 Gen, Cable-
June 1947), 9. grams, MT-206.
206 THE SIGNAL CORPS
School. The Chief of Staff had adopted OCS and to other officers needing technical
the policy of greatly reducing the direct training, General Van Deusen, the com-
commissioning of civilians, relying instead mandant of the Eastern Signal Corps School
on the various officer candidate schools to at Fort Monmouth, estimated that enroll-
supply the necessary commissioned person- ment in the Officers Department of the
nel. If the officer candidate schools were to school should reach 1,930 by the end of
be the only source of supply, it was important the year. Enrollment stood then at only 520,
that there should be a low rate of failure. and task forces would take most of these
A rate of 20 percent could be considered men before they completed the courses.
normal, but at Fort Monmouth the rate But as officers became more plentiful, the
was slightly more than 30 percent for the Officers Department of the school could be
first four classes. Late in April Col. Reuben expected to bulge for the first time since
E. Jenkins of the G-1 staff and Brig. Gen. the emergency had made students scarce.69
Clarence R. Huebner, Director of Training, The Services of Supply agreed that Fort
SOS, had gone to Fort Monmouth to find Monmouth's facilities must be increased be-
out why such a high percentage of candi- fore the Signal Corps could even begin to
dates had failed to receive commissions.66 cope with the need for training officers. On
The Chief Signal Officer had already their return to Washington from their in-
taken action designed to reduce the failure spection trip, Colonel Jenkins had promised
rate.67 To keep the attrition down even to additional instructors, and General Hueb-
30 percent, it had been necessary to re- ner that additional construction would be
strict the scope of the course to the capa- authorized.70 The Signal Corps began to
bilities of the candidates. Field commanders compute its needs for both. The estimate
had sent many applicants with ratings below called for fifty-six additional buildings,
the required AGCT score of 110. These men neither coldproof nor soundproof, without
had little chance of success in the course. plumbing and heated by stoves. These speci-
Yet the demand for electronics officers was fications were to cause criticism later. The
growing. The percentage strength of the 69
(1) Ltr, Van Deusen to CSigO, 9 Jul 42, sub:
Signal Corps in relation to total Army Increase in capacity of officers' courses, ESCS. SigC
strength was increasing; by the end of the 352 Ft. Monmouth 2, Jun-Dec 42. (2) CSigO,
Annual Report, 1943, p. 340.
year it would comprise 4 ½ percent instead 70
Another impression they brought back was that
of 3 percent of the Army.68 To give instruc- the Signal Corps did not know how to teach
the candidates to shoot a rifle. Colonel King said,
tion in communications to the graduates of "We are supposed to be communications people—
not sharpshooters!" With a student body of 1,800
66
Memo, Col Meade, Dir of Planning OCSigO, in April, the OCS had only 222 rifles, issued under
for CSigO, 30 Apr 42, sub: Visit of Col King and a table of allowance for a student capacity of 500.
representative of G-1 to OCS at Ft. Monmouth. King straightway sought the advice of a rifle expert
SigC 352 OCS 2, Apr-May 42. to locate a good instructor for the Officers' Depart-
67
Memo, Col King, Mil Pers Br, for Dir of Pers ment and the RTC's as well. (1) Ltr, Col Reeder,
SOS, 23 May 42, sub: SigC OCS. SigC 352 OCS Asst Comdt SigC School, to CSigO, 7 Apr 42, sub:
1942-44. Increase in allowance of rifles for Officer Candidate
68
Kent Roberts Greenfield, Robert R. Palmer, Dept, Signal School. SigC 474 Gen (Small Arms).
and Bell I. Wiley, The Organization of Ground (2) Recording of telephone conversations between
Combat Troops, UNITED STATES ARMY IN Col King and Col Richard B. Moran, Sig Officer
WORLD WAR II (Washington, 1947), Tab 3, p. AGF, 30 May 42; between King and Reeder, 26
203. May 42. SigC 352 OCS 2, Apr-May 42.
SIGNAL SCHOOLING 207
72
War Department authorized the construc- Signal Corps could meet its requirements.
tion, as General Huebner had promised, The Services of Supply was able to increase
although not until after a decision had been its officer pool to 4,500, second only to that
rendered on a capacity increase for which of the Infantry in size.
King argued practically man by man.71 Except for the Electronics Training
Getting more buildings, more instructors, Group, the Signal Corps had practically
and a larger authorized capacity were nec- reached its authorized strength in officers
essary steps toward producing more officers. by July 1942. Further action would have
Getting the men, and particularly qualified to wait on new authorizations, and Colonel
men, was another matter. By July 1942 the King relaxed his efforts to obtain more offi-
Signal Corps had 8,800 officers. It needed cers from civil life. He did not yet know
13,400. Despite the expected output of the what a deep disappointment the Army Spe-
Officer Candidate School and procurement cialist Corps would prove to be, nor that
objectives already approved, the supply the Signal Corps therefore would have to
would still fall almost one-third short of depend upon the nontechnical output of
the more than 30,000 who would be re- second lieutenants from the Officer Candi-
quired for an Army of four and a half mil- date School.
lion men, which was in prospect. The Under Meanwhile the percentage of candidate
Secretary of War had advocated bringing failures at OCS continued to be high. The
more officers into all the technical services fifth class, which graduated in June, was
by direct commissioning, through decen- the first to have studied under the revised,
tralized committees which were authorized simpler curriculum instituted in March.
to commission applicants without reference Entrance requirements had been so relaxed
to the War Department. The Signal Corps that only an estimated 2 percent of the
agreed with the General Staff in rejecting candidates possessed engineering degrees or
this manner of commissioning, which it was even a working knowledge of communica-
thought would result in unsuitable officer tions subjects. The course covered subjects
material. Colonel King asked for authority common to officers' candidate training for
to commission 1,100 men from civil life, all branches of the Army, with only 48
under the provisions of AR 605-10. He also hours' instruction in signal subjects in the
wanted a larger pool of officers to draw on basic, 33 hours in the intermediate, and 21
rapidly to meet whatever needs might ma- hours in the advanced phase. In these brief
terialize. The War Department General periods devoted to strictly Signal Corps sub-
Staff denied the request for direct commis- jects, the candidates got a smattering of
sioning, because it held the optimistic view, the elements of electricity, radio code and
not shared either by the Signal Corps or
72
by the Services of Supply, that with proper (1) Memo cited n. 66. (2) Memo, King for
Dir Pers SOS, 8 May 42; (3) Memos, Brig Gen
administration of the OCS and the utili- James E. Wharton, Dir of Mil Pers SOS, for CofS,
zation of Army Specialist Corps officers the 12 and 20 May 42, sub: Increase in proc objective
AUS (SigC) ; (4) Memo, Brig Gen John H. Hill-
71
(1) Ltr, Van Deusen to CSigO, 30 May 42, dring, ACofS G-1, for Mil Pers Div SOS, 23 May
sub: Increases in OCS. SigC 352 Ft. Monmouth 1, 42. SigC 381 Affiliated Units 4. (5) Daily Data,
Jan-May 42. (2) Recording of telephone conversa- Mil Pers Div OCSigO, 6-11 Jul 42. SigC SPSTP
tions between King and Jenkins, 1 Jun 42. SigC 14. On the disappointing experience with the Army
352 OCS 1942-44. Specialist Corps, see below, p. 316.
208 THE SIGNAL CORPS
procedure, basic signal communication and stood that the purpose of the school was to
signal supply matters—not enough to fit a provide leadership training, and had ex-
graduate for technical duty. The communi- pected that they would receive training in
cations instruction of the fifth class was so communications subjects. Lacking interest,
elementary that the 27 percent of failures they proved to be poor students.76
73
could not be attributed to it. Many officers and students alike de-
The sixth class, which graduated in July, nounced the demerit system as tending to
did better, with a failure rate of only 16 perpetuate a schoolboy atmosphere not con-
percent.74 The next two classes did still bet- ducive to building up self-esteem and re-
ter, with failures of only 13 and 15 percent sponsibility in prospective officers. General
respectively, the lowest percentage the Of- Van Deusen said that no candidate was
ficer Candidate School ever attained. It ever relieved until the general had reviewed
was achieved during the school's most his record, and that he himself had never
crowded period. Expecting 1,100 men for attached any special importance to de-
the eighth class, Monmouth received well merits. But because the practice of giving
over 1,500. Somewhere there had been demerits had been so misunderstood, he dis-
a failure to co-ordinate; the quotas set for continued it. Colonel Guest deplored the di-
the June class were confused with the ca- rectives "requiring numerous compulsory
pacity authorized for the period later in the subjects," which he believed had "ham-
summer when the additional buildings strung" the school in its teaching.77 Despite
would be ready. As many as 75 men crowd- all the explanations, General Olmstead felt
ed into barracks designed for 63, every tent that the high rate of failure of officer can-
Monmouth possessed was set up and oc didates lay not in administration or in teach-
cupied, and mess halls operated on two ing methods, but stemmed straight from
shifts. poor selection of candidates. The rate of
The lower rate of failures may have re- failure in relation to the AGCT ratings of
sulted in part because of a change in ad- members of classes two through six bore
ministration and teaching methods. Many him out in this:
theories had been advanced to explain the Percentage
AGCT Score of Failures
previous high rate of failures. Colonel King
Below 1 1 0 . . . . . . . . . . 60.
had been particularly disturbed about a 110-119 . . . . . . . . . . 53.3
heavily weighted final quiz. To save poten- 120-129 . . . . . . . . . . 26.6
tial officers who had otherwise completed 130-139 . . . . . . . . . . 14.
the courses satisfactorily, he urged Milliken 140 and above . . . . . . . . 13. 2
to omit this "embroidery," and he carried May 42; Action 3, Lattin to Opns Br, 22 May 42;
his point despite Lattin's advocacy of the Action 5, King to Opns Br, 23 May 42, all on sub:
practice.75 Other officers noted that candi- Trip to Ft. Monmouth by Capt Duncan Hodges.
dates sent by the Air Forces had not under- SigC 333.1 Ft. Monmouth, 1940-43.
76
Memo for File, Capt W. M. Atkinson, OCSigO,
73
1st Ind, Asst Comdt ESCS to CSigO, 22 Jun 14 Aug 42, sub: Interview of unsuccessful officer
42, on Ltr, CSigO to Comdt ESCS Ft Monmouth, candidates, ESCS. SigC 352 Ft. Monmouth 2,
16 Jun 42, sub: Failures, OCS. SigC 352 Ft. Mon- Jun-Dec 42.
77
mouth 2, Jun-Dec 42. (1) OCSigO R&W Action 3, Guest to Meade,
74
Memo, CG Ft. Monmouth for Col Lattin, 6 9 Jul 42, sub: Article; (2) Ltr, Van Deusen to
Aug 42. SigC 342 Ft. Monmouth 2, Jun-Dec 42. Lattin, 14 Jul 42. SigC 353 Ft. Monmouth 2,
75
OCSigO R&W Action 1, King to Opns Br, 8 (RTC) May-Aug 42.
SIGNAL SCHOOLING 209
Seeking to improve the methods of selec- Service. Like the authorizations for officer
tion, he directed that class standing be de- candidates, the authorization for ETG of-
termined as upper, middle, and lower third, ficers had been increased from time to time,
hoping that thus a good formula might be and totaled 3,000 by June 1942. But as of 30
established to guide the selection of the more June, only 616 such officers were actually on
apt candidates.78 duty, 151 at Fort Monmouth and 465 on
No matter how competent the graduates detached service.80
or how excellent the instruction, the Officer Because the educational and personal re-
Candidate School could not turn out officers quirements for appointment were excep-
able to perform the highly complex duties tionally high, it was difficult to find men to
of a signal officer without at least a fair meet them. An educational prerequisite was
measure of technical training—training a background fitting the applicant for radar
which they would get if there happened to study. Since very high and Ultrahigh fre-
be enough time to permit them to go on quency subjects had as yet only been
to the specialized work in the Signal Corps touched upon in electrical engineering
School. But the calls for officers were still courses, few college graduates could qual-
too urgent to allow for that. As one of the ify and these few were in heavy demand in
officers who went directly from OCS said: all the military services and in industry.
"We could march, drill with precision, fire Some appointees were electrical engineer-
a rifle, and creep and crawl like veterans, ing graduates who had majored in power
but we were not able to operate a signal courses and who would have to be trained
center until we got our training overseas from scratch in very high frequency sub-
79
the hard way." jects. The type of loyalty investigation to
One group of officers able to fill highly which they were subjected also delayed ap-
technical positions were those graduated pointments and eliminated some appli-
81
from the Electronics Training Group. As cants.
one of its varied training services, Fort Mon- Although the bulk of the first ETG offi-
mouth accounted for these students, al- cers had been sent immediately to the
though most of them were enrolled in United Kingdom, by June the Signal Corps
British schools and attended Monmouth received permission to divert 100 per month,
only long enough to receive a short course up to 600 students ait any one time, to take
in basic military subjects while on their the Cruft Laboratory course at Harvard
way to or from England. These officers had University. Those who completed that
been directly commissioned especially to fill course and who were qualified for advanced
technical positions in the Aircraft Warning work (about one half of them) might then
be sent for another twelve weeks of instruc-
78
(1) Incl, Data on Glasses 2 through 6 inclu-
80
sive, to Memo, Van Deusen for Lattin, 21 Jul 42. Signal Corps Information Letter, No. 9 (1
SigC 352 OCS 3, Jun-Aug 42. (2) Ltr, Olmstead August 1942), p. 33. See above, pp. 44ff.
81
to Comdt ESCS Ft. Monmouth, 29 Jun 42, sub: (1) Memo", Capt J. S. Vaughan, Mil Pers Div
Relative class standing of graduates of OCS. SigC OCSigO, for King, 7 May 42, sub: Proc of tech-
352 Ft. Monmouth 2, Jun-Dec 42. nically qualified officers for SigC; (2) Recording
79
Interv, SigC Hist Sec with 1st Lt Robert C. Os- of telephone conversation between King and Jen-
borne (formerly attached to the 16th Signal Op- kins, 27 Apr 42; (3) TAG Ltr, 17 Feb 42, AG
erations Battalion as a signal center operator in 210.1 SigC (2-12-42) RA. SigC 352.11 Gen 2,
Australia and New Guinea), 14 Nov 44. May-Dec 42.
264-211 O - 78 - 15
210 THE SIGNAL CORPS
85
tion at the Massachusetts Institute of Tech- perience with these sets. The British also
nology, where the training compared favor- eagerly opened their research establishments
ably with that received in the British mil- to growing numbers of ETG students who
itary schools.82 Although it was the practice were assigned to work on every new type of
to cull out the better qualified for the over- pulse radar equipment under develop-
seas training, the British training officials ment.86
found that some students were not ready for Ionospheric radio propagation was also
the advanced courses they offered, and had studied. Most of the experimentation in that
to be given ten to twelve weeks of funda- field had been done by the British, the reason
mental instruction in electronics. Others assigned for the relatively laggard program
were assigned to filter information center in the United States being that commercial
courses, and a few to very high frequency airlines, as well as the Navy and the Air
courses. Forces, depended upon short-distance com-
Of the students sent to the United King- munications, especially the systems of bea-
dom, about half were trained by the Royal cons and radio ranges which covered the
Ordnance Corps and half by the Royal Air continent. The British Commonwealth,
Force (RAF), none by the Royal Corps of needing to communicate at considerably
Signals. Airborne training, as such, was longer range, 2,000 miles, for example, in-
limited to the 10 percent of the group that stead of 500 miles, had sought to send mes-
would be transferred to the Army Air Forces sages by sky waves, utilizing the reflecting
upon completion of the courses. But many properties of the ionosphere, which lies
more were enrolled in the RAF schools be- approximately 60 to 300 miles outward
cause in the British organization the RAF from the earth's surface. Ionospheric data
operated much of the ground equipment gathering stations were new and few. The
which in the United States Army was a principal emphasis, especially military, had
responsibility of the Signal Corps.83 been upon the development of radio trans-
The British gave instruction in ground mitters and receivers which would operate
radar and related apparatus (MRU, CH, in the high frequency band employing sky
GCI, ACH, TRU, VHF, and filter equip- wave propagation. If the operation were not
ment) , in airborne radars AI and ASV, and successful, one tended to assume that the
84
in army sets GL and SLC. By the summer fault was in the equipment. But it had be-
of 1942 the British schools were also teach- come apparent that since so much activity
ing the American officers how to site the in radio communication extended to,
Signal Corps' own radars, the SCR-270 through, and beyond the ionosphere, radio
and SCR—271 sets, according to texts re- engineers and scientists must well under-
vised by the Signal Corps as a result of ex- stand the nature of that layer. The British
82
(1) Daily Data, Tng Div OCSigO, 20 Feb
Admiralty and Air Ministry had set up the
42, and Mil Tng Div OCSigO, 28 May 42. SigC
85
Hist Sec Card File. (2) Memo for File (unsigned), (1) Memo, Col Saville, Div of Air Defense,
23 Apr 42, sub: Progression of students, Harvard— for CSigO, 24 Mar 42, sub: Siting experts from
M. I. T. SigC 000.8 Cruft Lab. ETG officers; (2) Ltr, CG AAF to CSigO, 24 Mar
83
SigC 352.11 ETG, passim. 42, same sub. SigC 353 Gen Feb-Aug 42. MT-40.
84 86
Memo, Col Baker for King, 4 Aug 42, and Cablegrams 330, London to AGWAR, 31 Dec
Incl to Memo, CO ETG for Mil Pers Div OCSigO, 41, and 462, AGWAR to Milattache (SPOBS)
18 Jul 42. SigC 352.11 ETG. London, 4 Feb 42.
SIGNAL SCHOOLING 211
Inter-Service Ionosphere Bureau (ISIB) to meet its commitments to the United
at Great Baddow, near Chelmsford, Essex, States Army Air Forces,88 no change was
in 1941. At the time of the arrival of the made in the original arrangement. Practi-
ETG officers the bureau was working day cally all the officers were returned to the
and night taking vertical incidence sound- United States for assignment. An exception
ings of the ionosphere, measuring field in- was a contingent of 50 held in England
tensities and monitoring the bearings and to join the 562d Aircraft Warning Bat-
other characteristics of special enemy trans- talion with ROUNDUP under the plan for
missions, some of which were located as far launching a cross-Channel offensive early
away as Berlin and northern Italy.87 in 1943.89 The British-trained ETG officers
In their training assignments the ETG were ready almost immediately for opera-
officers became closely identified with their tional employment. A week usually sufficed
British comrades. Some took part in bomb- for study of the American equipment with
ing missions over the Continent; a few which they were not familiar. On their re-
would be on the Rock of Gibraltar before turn to the United States they paused at
the invasion of Africa; others would be with Fort Monmouth only long enough to re-
the invasion parties at Casablanca. It be- ceive their assignments, or to get a short
came more and more difficult to keep track period of basic military training in case they
of them even though overseas they were had missed it on the way overseas because
charged to the headquarters of the Services of transportation schedules that hurried
of Supply in London and officially were re- them across the Atlantic.
stricted to service in the United Kingdom. With the facilities existing earlier it had
The great need everywhere for electronics not been possible, in an equivalent length
officers brought many requests for the ETG of time, to obtain results in the United
trainees. There was pressure from the States which equaled those of the estab-
United States Army and the British Army lished British aircraft warning schools.90 By
for their assignment in Europe; the Pacific the summer of 1942 the picture was chang-
wanted them; schools and other activities ing. Aircraft warning training had been
in the homeland needed them. So rapidly centered at Camp Murphy and civilian uni-
were the requirements of the Air Forces in-
versities were participating in the electron-
creasing that it was proposed to have the
ics training program on a wider scale.
Royal Air Force train 75 percent of the
Troopships crossing the Atlantic were now
second contingent of 500 instead of half as
heretofore. The RAF was willing, provided heavily laden and ETG officers had to be
it could retain the men on a training status squeezed in wherever space could be found
for fourteen months instead of the eight for a few at a time. Sometimes they arrived
agreed upon, in order that they might serve 88
SigC 352.11 ETG, passim.
as officers of coastal and bomber com- 89
Ruth F. Sadler, History of the Electronics
mands, some in the Near East. Since this Training Group in the United Kingdom, SigC
historical monograph G-5, p. 31. SigC Hist Sec
would not have permitted the Signal Corps File.
90
Ltr, Lt Col W. R. Lansford to CSigO, 15 Jun
87
Interv, SigC Hist Sec with Capt Dana K. 42, sub: Proposed course of instruction of ETG of-
Bailey, RAF representative, ISIB, England, Jun 44, ficers for tng in the United Kingdom for secs to
pp. 1-14. follow original ten secs. SigC 352.11 ETG.
212 THE SIGNAL CORPS
late for the classes they had been scheduled ing for aircraft warning personnel from the
to attend. Delays became more serious as time the men left the reception centers. The
the RAF schools, which now began to train decision went to the Signal Corps. The Chief
the uniformed womanpower of Great Brit- Signal Officer would retain control of re-
ain in aircraft warning duties, could no placement training centers and technical
longer afford to set aside their training fa- schools which turned out aircraft warning
cilities for American officers who could not specialists for both the AAF and the Army
be depended upon to fill the spaces.91 Grad- Ground Forces. It was recognized that the
ually the institutions in the United States AAF must be able to modify from time to
absorbed the training of these officers. In time the number and type of specialists being
late summer Fort Monmouth relinquished trained, and to change the amount of time
to Camp Murphy the responsibility for ac- devoted to training specific specialists, in
counting for ETG students, along with its order to meet changing requirements for air-
radar courses. craft warning activities for task forces, de-
fense commands, and theaters. To serve this
Camp Murphy need, the Signal Corps, the Army Air Forces,
and the Army Ground Forces agreed to re-
The bulldozers and construction crews view jointly the Signal Corps training pro-
had barely begun work on the site of the new grams at Signal Corps reception centers and
Signal Corps Radar School at Camp Mur- technical schools in order to screen out all
phy, on Hobe Sound, Florida, when the types of specialists who could be trained in
whole matter of providing Signal Corps units or in training establishments of lower
aircraft warning specialists for the Army Air classification, and in order to reduce to a
Forces was thrown into question by a dispute minimum the time required to train each
growing out of the big 9 March reorganiza- individual. The initial review would be fol-
tion of the Army. Two days earlier, Signal lowed by others, the Signal Corps schools to
Corps and Air Forces representatives had be thrown open to AAF and AGF inspection
met with General Somervell, then G-4 and at any time.92
soon to become the head of the new Services The decision to give only the minimum
of Supply, and had discussed among other training to the largest number of men—as
things their differing views of the respon- Somervell put it, the problem of numbers
sibilities given the AAF for aircraft warning versus quality production—was one that
activities. The conference ended in numer- gave many Signal Corps officers concern.
ous compromises. The Signal Corps yielded Radar was new, and intricate. There were
the preparation of tables of organization and no precedents on which to base even a good
tables of basic allowances for aircraft warn- guess as to the length of time it would take
ing units to the AAF, along with personnel to train men how to use, maintain, and re-
to perform the work. pair the equipment properly. Some officers
On the other hand, the AAF contended not very familiar with the equipment
that it should have complete control of train- thought three months would be enough. The
91 92
Ltr, Lt Col K. S. Stice, CO ETG London, to Memo, CG SOS for CSigO, 9 Mar 42, sub: AW
CSigO, 24 Dec 42, sub: Delayed handling of ETG activities. SigC 020 WD (Reorgn of the WD) 1942.
officers. SigC 352.11 ETG. Deputy CSigO File.
SIGNAL SCHOOLING 213
men who had worked most closely with it in luxury. Training administrators set the
the laboratories made the longest estimates; cycle for training enlisted men at seven
Colonel Conrad, for example, estimated that months: four months for the radio course
it would require from ten to twenty-two and three months for the radar maintenance
months to give a qualified student a thor- course. The officers' course they set at ap-
97
ough understanding of the technical per- proximately five months.
formance of radar sets.93 Dr. William L. Though reverberations from the Army
Everitt, who headed the Operational Re- Air Forces-Signal Corps differences of
search Group in the Office of the Chief Sig- opinion over aircraft warning training con-
nal Officer, thought radar equipment was tinued to resound for some time to come,
still a laboratory instrument, and would re- they had little effect on local operations at
main so for some time to come. As such, he Camp Murphy. Colonel Mitchell, the com-
thought it should be in the hands of thor- mandant, was assigned to the new school in
oughly qualified men, and deplored a tend- March 1942. After a brief trip to look things
ency to consider the average American "so over, he returned to Washington with plans
smart" that he could be trained for radar to rush construction, and to start classes
work in a few weeks.94 Colonel Gardner, the meanwhile in a leased warehouse in nearby
director of the Aircraft Radio Laboratory Riviera, Florida, until Camp Murphy
at Wright Field, thought it would take a should be ready for occupancy.98
long time to train men to maintain and re- The new establishment was well situated
pair the new devices. He thought that even for radar instruction. The climate made
a thorough understanding of them would be year-round training feasible, and much of
but "a prelude ... to further education the 11,500-acre tract stretching along Hobe
in the field by the actual maintenance and Sound for about five miles was wild, inac-
use [of the equipment]." 95 The Chief Sig- cessible swampland covered thickly with
nal Officer himself wrote that "no matter palmetto, fern, and bamboo which would
how efficiently constructed these technical discourage prying observation of the secret
sets may be, unless they are properly oper- radar operations practiced there.99 By sum-
ated and maintained in the field the objec- mer more than 400 one-story paintless
tive for which they were produced is lost." 96 buildings had sprung up on the site. The
However sound the arguments for thor- foliage of the Everglades provided camou-
ough training of radar specialists might be, 97
Ltr, CSigO to CG SOS, 16 May 42, sub: Ex-
time pressed too heavily to permit such a pansion of SigC school facilities for tng radar re-
pairmen. SigC 352 Southern SigC School, Jan-Dec
93
OCSigO R&W Action 2, Col Conrad, Asst Dir 42. MT-32.
98
of Planning, to Exec Officer Sig Tng Div, 11 May (1) Report of Inspection Trip to Hobe Sound,
42, sub: Educational program for officers and en- Florida, by Col Mitchell, 17 Mar 42; (2) OCSigO
listed pers. SigC SPSTP 5 Misc. R&W Action 1, Mitchell to Chief of Fld Svs, 23
94
OCSigO R&W Action 5, Everitt to Mil Pers Mar 42; Action 2, King to Milliken, Chief of Fld
Div, 28 Sep 42. SigC 353 Gen Sep 42-Dec 42. Svs, 25 Mar 42; Action 3, Milliken to King, 26
MT-41. Mar 42, all on sub: Necessary schedule to initiate
95
Ltr, Gardner to All SigC Pers on Duty at Philco tng at Camp Murphy prior to 25 Apr 42. SigC
Tng School, 19 Feb 43. Pamphlet Philco Tng 352 Hobe Sound 1942.
99
School, n. d. SigC Hist Sec File. Memo for File, Capt Charles F. Fell, OCSigO,
96
Ltr, Olmstead to R. C. Muir, GE Co., Schenec- 11 Feb 42, sub: Acquisition of land for SigC AW
tady, N. Y., 6 Apr 42. SigC 095 GE Co. school, Hobe Sound. SigC 353 Gen 12, Jan-Mar 42.
214 THE SIGNAL CORPS
flage for the green lumber structures and tricity and the elements of radio, a radar
the crushed-shell roads which ribboned the survey course, and eventually a new depart-
post. ment, General Radar, had to be added to
Even before the school was ready to ac- the school to mend the deficiencies. The
cept its first students, the scheduled capacity whole organization of the school was nec-
of 1,605 students had been increased to essarily experimental.101
3,605, to be divided between the prerequi- Obviously, a radar school had to have
site radio repair course and the radar course. radar sets for its students to work on, not
This output would fall short of the year's merely blueprints or textbooks to study. But
requirements; by activation schedules, 1,754 from its beginning, the school was handi-
short, or on the basis of equipment delivery capped by a lack of training sets. Each one
schedules, 4,210 short. Acting on the March it got had to be diverted from operational
agreement with the AAF to put as much of use by the Army Air Forces or the Coast
the training as possible in schools of lower Artillery Corps, and the scheduled produc-
classification, the Signal Corps proposed to tion of sets was not enough for operational
give the radio repair training in civilian requirements alone. Moreover, plans for the
schools, devoting Camp Murphy's entire operational use of the Aircraft Warning
capacity to the radar courses, and the Serv- Service were by no means fixed; the equip-
ices of Supply agreed.100 ment changed repeatedly as experience in
It was a decision that could not be ad- its use revealed new secrets, and this in turn
hered to. At first the school comprised three changed personnel and training require-
main departments: Pulse Goniometry, ments. Thus, even had there been plenty of
which had divisions devoted to airborne, sets, the services would have had difficulty
gun-laying and searchlight, and reporting in fixing priority of importance to particu-
equipment: Engineering, which taught re- lar sets, and hence to the numbers of men
pair shop techniques; and Training Litera- to be trained in their use. Yet the amount
ture, which provided the lesson texts. As of training equipment available to the Ra-
summer moved on, some students coming dar School would largely determine the size
from the radio courses in civilian schools of the classes it could train.102 The whole sit-
proved to be still not qualified to enter the uation resembled a jigsaw puzzle, identifi-
radar courses, and about one third of the cation of each piece depending on fitting
officer students needed preliminary instruc- another piece smoothly into place.
tion. New courses in the principles of elec- The Coast Artillery Corps had given first
100 101
(1) Ltr, CSigO to CG SOS, 16 May 42, sub: Ltrs, Comdt SigC Radar School, Camp Mur-
Expansion of SigC school facilities for tng radar phy, to CSigO, 25 Aug 42, sub: Courses of in-
repairmen, and 1st Ind, Tng Div SOS to CSigO, 29 struction, the SigC Radar School, and 8 Aug 42,
May 42. SigC 352 Southern SigC School, Jan-Dec sub: Radar survey course. SigC 353 Hobe Sound,
42. MT-32. (2) 1st Ind, Hq SOS to CSigO, 15 1942.
102
Jun 42, on Ltr, CSigO to CG SOS, 6 Jun 42, sub: (1) OCSigO R&W Action 1, Lt Vance, Radar
Tng of SigC radio mechanics in civ institutions for Div, to Col De Armond, Liaison officer AAF, 24
entrance to SigC Radar School, Camp Murphy. Jun 42, sub: Diversion of radar equip for SigC
SigC 352 Hobe Sound SigC School 3, Jun-Jul 42. School. SigC 352 Hobe Sound SisrC School 3, Jun-
(3) 2d Ind, Comdt SigC Radar School to CSigO, Jul 42. (2) Memo, Rives for Milliken, 26 Apr 42,
19 Sep 42, on Ltr, Comdt Radar School to CSigO, sub: Spare parts and components of SCR-268,
25 Aug 42, sub: Courses of instruction, SigC Radar 270 and 271 radio sets for school tng. SigC 413.44
School. SigC 352 Hobe Sound, 1942. MT-198 and MT-194.
SIGNAL SCHOOLING 215
priority to the provision of six SCR-268's operational experience, would give him pre-
for use of the school's Gunlaying Division. liminary training at the controls—that is,
The first two sets arrived, minus oscillo- in starting the set or shutting it down, in
scopes and receivers, without which they learning the possible source of trouble by
were practically useless even for training variations in the visible lights, switches, and
purposes. The Reporting Division's first meters. Philco was building SCR-270
class had only two SCR-270's and a single trainers which would go a step farther, and
SCR-588 CHL set to study. The first stu- provide operational experience without the
dents in the Airborne Equipment Division necessity of using live aircraft for targets.104
were taught on the SCR-521 airborne But scarcely any of this equipment was on
search set and on the Mark IV IFF radars, hand in the summer of 1942.
SCR -515, employed in aircraft,Not andthethe
least of the school's problems was
companion sets, SR-532 and 533, employed the familiar one, the quality of the students.
on the ground. Later the Mark IV IFF Every applicant had first of all to survive a
equipment, of American design, was with- thoroughgoing loyalty investigation into his
drawn from use because of a Joint Radar personal and family background. In addi-
Board decision to use the British Mark III tion, he was supposed to have a background
instead. Thus 64 men trained on the Ameri- knowledge of radio and an AGCT score of
can sets again became unskilled when they at least 110, equal to that for Officer Can-
were confronted by the British equip- didate School. The intake of students often
103
ment. brought candidates who failed to meet the
To supplement the limited number of ac- educational and mental standards, and the
tual radar sets available for training, the percentage of failures was accordingly
Signal Corps Radar Laboratory, the Coast high.105 For example a survey of students
Artillery Corps, and the National Defense enrolled in the principles of electricity sub-
Research Committee engaged in a search course in July revealed that only 10 percent
for adequate training substitutes. The Coast could be expected to go through the Radar
Artillery Corps developed and built a bread- School without difficulty. About 40 percent
board model to teach azimuth and elevation might become apprentice repairmen within
tracking for the SCR-268, and was con-
104
sidering the purchase of another pilot model (1) Ltr, Rives to CotCA, 9 Mar 4Z, sub:
embodying the BC-412 oscilloscope. Va- of Rqmtsequip;
Trainer 2d Ind, president of CA Bd to Chief
Div Hq AGF, 24 May 42; 7th Ind, Col
rious British trainers were being sought. Corput, Dir of SigC Lab, to CSigO, 10 Jun 42;
The First Interceptor Command's Aircraft (2) Ltr, Spec Observer, American Embassy, Lon-
Warning School at Fort Dix had prepared don, to CSigO, 4 May 42, sub: RDF tng equip.
SigC 412.684 Tng equip. MT-49. (3) Ltr, Col
blueprints for an SCR-270 mock-up which Hayden to Dir of SigC Radar Lab, 2 Feb 42, sub:
although it would not give the student any Tng Material; 1st Ind, SigC Radar Lab to CSigO,
9 Mar 42; 1st Memo Ind, Capt Earl J. Atkinson
103
(1) Memo, Lattin for Milliken, 5 Jun 42, sub: to Maj E. A. Redding, Mil Tng Div OCSigO, 14
Equip. SigC 352 Hobe Sound SigC School 3,'jun- Mar 42, on Memo, Redding to O/C Radar Div, 22
Jul 42. (2) Ltr, Lattin to Comdt SigC Radar Jan 42. SigC 413.684 Tng Equip, Oct 41-Aug 42.
School, Camp Murphy, 11 Jun 42, sub: Status ra- SigC MT-49.
105
dar equip items; (3) OCSigO R&W Action 1, Maj 1st Ind, CG AA Comd to CSigO, 26 Jun 42,
Fell, Sv School Sec, to Capt R. M. Atkinson, Mil and 2d Ind, CSigO to CG AA Comd (without basic
Tng Div, 9 Jul 42. SigC 352 Southern SigC School, ltr), 1 Jul 42. SigC 352 Southern SigC School, Jan-
Jan-Dec 42. MT-32. Dec 42. MT-32.
216 THE SIGNAL CORPS
the allotted time, and another 40 percent a series of tests which exploded the rumors.
were obvious misfits unacquainted with They showed that long periods of contin-
electrical terms and unable to master the uous work at the oscilloscope caused ocu-
simplest forms of arithmetic without dif- lar fatigue no greater than that which fol-
ficulty but possibly capable of becoming ele- lows a long period of reading, or watching
mentary radiomen. The last 10 percent a double-feature movie. Tests of radiation
seemed hopeless.106 intensities were no more alarming. Radar
Radar repairmen were the elite, the Phi men faced no greater hazard than would be
Beta Kappas of the school. To earn a "su- encountered in working with high-voltage
perior" rating as a graduate radar repair- equipment of any sort.108
man, a student had to be able to take over Wearing two hats, as commandant of
a type of radar he had not previously stud- the Signal Corps Radar School and as post
ied; to supervise the installation of radar commander of Camp Murphy, Colonel
equipment and diagnose trouble quickly; Mitchell found his duties wide and often
to analyze radar circuits, and make substi- burdensome, with scarcely discernible lines
tutions in an emergency. Less expert re- of demarcation between his accountability
pairmen received ratings of "excellent," to the service command and to the Chief
"very satisfactory," or "satisfactory" ac- Signal Officer. The new camp needed al-
cording to the degree of ability they dis- most everything. Mitchell felt it needed pro-
played. Men who could not quite make the tection for the costly and scarce radars on
grade as repairmen could usually become hand—for example, canvas covers for pro-
operators.107 But not all of them wished to tection against hurricanes and a military
do so. Radar students worked to a great police force or some combat troops to guard
extent on their own initiative, and men against hostile human intruders. For his
capable of studying in that manner were men on the post, Mitchell wanted bus trans-
scarce. Others qualified for radar study ob- portation, recreational facilities, a drill
jected to assignment at the school because ground, a baseball field, a band.109 Although
of grapevine rumors that work at the oscil- the camp stretched for miles along Hobe
loscope was injurious to an operator's eye- Sound, there was not even a bathing beach
sight, and that radiations from a radar set available until neighboring estate owners
were harmful and could possibly cause ster- offered private beach, dock, and boat fa-
ility. Radar was so new that not even the cilities to the men of Camp Murphy.110
engineers who developed it could be abso- On 15 June 1942 the first classes began
lutely certain of the effects. To find out, stu- studying at Camp Murphy proper, and all
dents at some military institutions and at 108
Norman A. Abbott, "Radar and the Man."
Purdue University served as guinea pigs in Signals,I:2 (November-December 1946), 31.
109
(1) Memo for File, Col Willis, OCSigO, 14
106
Ltr, Actg Dir of SigC Radar School to Asst Sep 42, sub: Problems of SigC Radar School, Camp
Comdt Camp Murphy, 3 Jul 42, sub: Rpt on Engr Murphy. SigC 353 Hobe Sound. (2) Ltr, CO Camp
Dept students as a body. SigC 352 Hobe Sound Murphy to CG SOS, 28 Aug 42, sub: Request for
SigC School 3, Jun-Jul 42. band and musical instruments for Camp Murphy.
107
Review of Training Activity, The Southern SigC 352 Hobe Sound, 1942.
110
Signal Corps School, Riviera-Camp Murphy, 15 Ltr, Actg CSigO to Chief of Spec Svs, 16 Jul
Apr 42-15 Jun 43, Vol. II, passim. SigC Hist Sec 42, sub: Camp Murphy, recreational facilities, and
File. 2 Incls. SigC 352 Southern SigC School. MT-32.
SIGNAL SCHOOLING 217
training at Riviera came to an end. Of the lation of 25,000 or 30,000 men under the
students who had enrolled there in April, existing organization.113
208 officers and enlisted men were gradu- It began to look as though it would have
ated on 9 June ahead of schedule, and 50 to. The Services of Supply had just stated
others received diplomas on 5 July. By the the minimum requirements for Signal Corps
end of July, 305 officers and 2,142 enlisted personnel for the Aircraft Warning Service:
men were enrolled at the school.111 Colonel 70,000 men by the end of 1942, with an
Mitchell felt that Camp Murphy was by additional 37,000 on other duty with the
114
then well established and that radar train- Air Forces.
ing was on a firm footing, an opinion shared The real participation of the United
by a representative of the Army Air Forces States Army in the war was just beginning.
who visited there in July: "Camp Murphy Across the Atlantic America's allies still
reflects very creditably upon the Signal bore the brunt of the fighting. In the Pacific
Corps . . . the high quality and com- the United States forces still lacked the men
petency of the instructor personnel im- and material to conduct a major offensive.
pressed me favorably together with the Plans for the invasion of North Africa were
associated good direction and super- just taking shape. But already nearly every
112
vision." Mitchell agreed to accept all training problem that would plague the
radar students completing courses in other Signal Corps during the entire period of
schools for crew training and postgraduate the war had been encountered in some
work before their assignment to field units, measure, and in achieving at least partial
and to take full responsibility for any fail- solutions the training structure was showing
ures attributable to lack of training of the stability and strength.115
men passing through the school. Camp 113
(1) Memo for File, Maj Fell, Mil Tng Div
Murphy, he thought, could grow to a popu- OCSigO, 1 Jul 42, sub: Radar repairmen SCR-588
( 7 7 5 ) ; (2) Ltr, CO Camp Murphy to Milliken,
111
Ltrs, CO Camp Murphy to CSigO, 20 Jun 7 Jul 42. SigC 352 Hobe Sound SigC School 3,
42, 26 Jun 42, 10 Jul 42, 30 Jul 42, all on sub: Jun-Jul 42.
114
Prog rpt, Camp Murphy. SigC 319.1 Rpts, Prog Memo, Maj H. H. Butler, Mil Pers Div
(SSCS), May-Aug 42. MT-19. OCSigO, for Enlisted Br and Officers Br, 8 Jul
112
Ltr, Maj Harry B. Porter, Hq AAF, to CSigO, 42, sub: Allotments SigC pers with AAF. SigC
27 Jul 42, sub: Personal observations at Camp Mur- Career Mgmt Br File, SigC Units with AAF.
115
phy. SigC 352 Hobe Sound SigC School 3, Jun-Jul For the growth of training facilities in the
42. latter part of 1942, see below, pages 318-22.
CHAPTER VIII
sist the AACS.4 RTTY operation was cast. Inversely, at the receiving end, the
speeded by the assistance of automatic faint skyborne signals would be picked up,
cipher machines to encode and decode si- amplified, and passed on to a perforator
multaneously, on the line, at both the send- which would punch a tape in cipher. The
ing and receiving teletypewriters. This enciphered tape, now passing through a
combination made possible the secure second cipher machine, set to the same key
transmission of a weather message at the as the enciphering machine, would yield
speed of the sending teletypewriter. The a plain text tape, perforated in the five-unit
sender typed the English text of the mes- teletypewriter code. The plain text tape
sage on a teletypewriter, which, while pro- would, in the last step of the process, act-
ducing a page copy also perforated a tape. uate the receiving teletypewriter so that it
The tape was fed into an automatic en- would type up the message on a sheet, in
ciphering machine that conveyed the cryp- all respects the exact counterpart of the
tic product to the transmitter to be broad- original text. All this was done with the
4
For Signal Corps responsibilities and assistance
speed of light, with only one person work-
to the AACS, see pp. 277ff, below. ing, the one sitting at the originating key-
SIGNAL EQUIPMENT: WIRE AND RADIO 221
5
board. This is the way RTTY would even- Boehme equipment, which was very fast, up
tually work, but in mid-1942 it did not yet to 400 words a minute, but which was not
exist. entirely automatic.7 So General Olmstead
There was, however, another device at informed ACAN stations WTJ (Hawaii),
hand—radiotype. The Air Forces' need for WVN (Puerto Rico), and WVL (Panama)
speeding weather messages was obvious, on 20 June, adding: "For your information
made vividly so by the BOLERO mishaps in this equipment performs the same function
June along the North Atlantic air route to on radio transmission as a teletype machine
6 8
England. But there were obvious problems, performs on wire transmission."
too, presented by the wayward behavior of In military radio, hand-keyed Morse dah
radio signals, which, undisciplined by the dits had been the first step; Boehme the sec-
straight narrow path of wire, stray into the ond. The second step was now yielding to
wide open spaces of sky and mingle promis- the third advance in the art, radiotype. By
cuously with static, interference, and fading. September Signal Corps' Washington sta-
The International Business Machines Cor- tion was using automatic equipment, both
poration had worked out an imperfect so- wire teletype Q-102 and radiotype, all
lution involving equipment that the firm
leased, in communicating with eight ACAN
called radiotype, using, unfortunately, not
stations at home: 9
the standard five-unit teletypewriter code
but a special six-unit code. Like a narrow- IBM Radiotype
gauge railroad adjoining a standard line, WVR Fort McPherson, Atlanta
this special code necessitated much hand WVQ Wright Field
labor at conversion points where standard WVT Chicago
teletypewriter texts had to be shifted onto WVU Fort Omaha
radiotype circuits, and vice versa. More- WVB Fort Sam Houston
over, the standard automatic cipher ma- WVY Presidio of San Francisco
chines could not function with the six-unit Q-102 Teletype
system. WVO Boston
Notwithstanding these inconveniences, WVP Governors Island
the Signal Corps early in the war began 7
making use of radiotype, leased from IBM. IBM had first offered its radiotype to the Signal
Corps in March 1941. After some experimentation,
It was another step in the right direction, the Signal Corps agreed to give it a trial, and put
toward automatic, high-speed, heavy-duty into operation Army's first radiotype circuit be-
communications for the Army. Like Q-102, tween WAR and WVQ, Wright Field, Ohio, on 20
August 1941. (1) Mary-louise Melia, Signal Corps
RADIOTYPE equipment produced a punched Fixed Communications in World War II: Special
tape which could be relayed automatically. Assignments and Techniques (1945), SigC his-
The only hand work needed was the typ- torial monograph E-10, pp. 6, 10-11. SigC Hist
Sec File. (2) Oakes, Army Command and Adminis-
ing at the originating machine. Radiotype, trative Communications System, Pt. II, pp. 26-27.
speed 100 words a minute, would replace 8
Msg, Olmstead (Col French) to Signals WTJ,
WVN, and WVL, 20 Jun 42. SigC 413.44 Radio-
5
Incl, Radio Teletype System (unsigned), 3 type 2, May-Dec 42.
9
Oct 42, to OCSigO R&W Action 1, Gen Stoner to Oakes, Army Command and Administrative
Col Will V. Parker, 9 Nov 42, sub: Revision of Communications System, Pt. II, pp. 30-31. In com-
AR 95-200 AACS. SigC 676.3 AACS, 1942-44. municators' parlance, the equipment was not ex-
6
See below, pp. 283-85. actly automatic, but "semi-automatic," since some
222 THE SIGNAL CORPS
Radiotype continued to expand in mili- to hand punch Boehme tape for transmis-
tary use during the last half of 1942 and sion, plus the time taken to translate the
early 1943 before radioteletype, using the received tape back into English. Even so,
five-unit teletypewriter code, began to re- radiotype was not good enough, especially
place it. Late in 1942 a radiotype circuit since it suffered, as already noted, from the
went into service between WAR and Hon- disadvantage of employing a six-unit code,
olulu, the installation at WTJ, Fort Shaf- which did not conform with the universal
ter, accomplished by six enlisted men from five-unit teletypewriter system.
WAR and an IBM engineer, who arrived With the intensifying of the Army's com-
in Hawaii early in October. On 18 Decem- munication needs during 1942, fresh deter-
ber another radiotype circuit would go into mination arose to find ways to put the con-
regular operation between WAR and ventional wire line teletypewriter, five-unit
code and all, on the air, as radioteletype,
WVL, Quarry Heights, Panama.10
RTTY. And it was done, too, with the ef-
Radiotype was good. It was faster than
forts of American Telephone and Telegraph
hand-keyed radiotelegraph, faster even than
and Press Wireless. It was done in large
Boehme when one considers the time taken part by capturing the elusive far-darting
hand labor was required at relay points. Semiau-
radio waves by means of two diversity de-
tomatic was the term subsequently applied to the vices: frequency diversity and antenna
type 19 teletypewriter and its associated tape per- or space diversity. The former means simply
forator equipment, used both in wire and in radio
transmission. At first, however, men called it au-
that two frequencies were employed to
tomatic, as indeed it was, compared with hand- transmit and receive mark- and space-sig-
keyed and Boehme operation. See, for example, nals ; the latter means that the receiving sta-
Memo, Col Sadtler for Exec Control Div, 20 Feb
42, Rpt 24, sub: Prog rpt, 13-19 Feb 42. SigC
tion used two receiving antennas and two
(AC) 319.1 Weekly Prog Rpts, Army Com Br, Dec receivers in somewhat separate locations,
41-Jul 42.
10
several wavelengths apart. The purpose of
(1) Oakes, Army Command and Administra-
tive Communications System, Pt. II, pp. 31, 117.
diversity, whether of frequencies or of an-
(2) Weekly Digests, Col French, Traffic Div, 14 tenna positions, is to overcome the madden-
Oct 42, Item II A5, and 30 Dec 42, Item I Al. SigC ing tendency of high-frequency sky wave
319.1, Drawer 483 AC 133, Weekly Digest of Prog
and Problems, Rpts from Divs, 7/30/42-12/30/42.
radio signals to fade. For fading is fatal to
Radiotype would continue to be used consid- radioteletype, fatal to the synchronized op-
erably. Not till September 1943 would the Signal eration of the machines. The receiving tele-
Corps stop its procurement in favor of radiotele-
type and not until May 1945 would the Army typewriter must have a strong, steady sig-
take its last radiotype out of service (on the WAR- nal impulse at all times to keep its motions
Accra circuit). Then the triumph of radioteletype
would be complete. (3) Melia, Signal Corps Fixed in step with those of the sending machine;
Communications, pp. 19-20. (4) Oakes, Army otherwise, the printing of the former will
Command and Administrative Communications go awry. Radio engineers had learned that
System, Pt. II, pp. 34, 84, 122.
Manual operation continued to the war's end when fading occurs on one frequency, an-
on lightly used circuits, such WAR-Iceland. Hand other adjacent frequency will come in
keys were retained for occasional use to break
through the static encountered in auroral zones strong. Similarly, when the signal fades at
during magnetic storms. Under these conditions an the location of one receiving antenna, it
operator, by repeated manual transmissions, could
pound through a short emergency message when
will remain strong at another located some
radioteletype was blacked out. distance away. Hence the solution to fad-
SIGNAL EQUIPMENT: WIRE AND RADIO 223
ing at high frequencies was to use either pany and the British Post Office authori-
principle, or better, both of them. ties." 12
Frequency diversity immediately pre- Thus the diversity principles would not
sented a further great advantage. More only make possible single channel radiotele-
than two frequencies, or two tones, can type, RTTY, but they would also enable
be imposed upon the air, using a single radio operators to provide many channels
set of equipment. Four or six frequencies over one set of equipment, accomplishing
can be imposed and a separate communi- for military radio what spiral-four and car-
cation channel assigned to each pair of rier systems were doing for military wire.
them. An operator can then make radio- Multichannel radiotelegraph for huge,
teletype convey several signals simultane- fixed ACAN stations was one thing. To de-
ously. Thus, multi-channel radiotelegraph velop small single-channel radioteletype
emerged, exactly the counterpart in radio equipment for the Air Forces and for field
of carrier telegraphy in wire. Something troops was something else. The demand for
along these lines was already being done in it was now increasing. A relatively simple,
mid -1942 when the Signal Corps efficient, and rugged RTTY was a device
estab-
lished a multichannel link with London, that Ground Forces officers, no less than air-
using American Telephone and Telegraph way weather stations, were increasingly
equipment which enabled three two-tone seeking. On 6 June 1942 Col. Donald B.
telegraph signals to flash over the Atlantic Sanger, Coast Artillery Corps, president of
on one sideband of a powerful 40- thekilowatt
Desert Warfare Board, asked for two
radio transmission. Brig. Gen. Frank E. radio teletypewriters for the First Armored
Stoner had opened negotiations early in the Signal Battalion to test. Col. Edward F.
French, chief of the Traffic Division in the
year with American Telephone and Tele-
Washington headquarters, replied, dis-
graph for multichannel telegraph circuits
couragingly, that the only such machine
overseas "in anticipation of heavy radio-
available was the IBM radiotype, produc-
telegraph circuit requirements between
tion of which was not even meeting his Sig-
Washington and the British Isles, the Euro-
nal Center needs. Furthermore, Colonel
pean Continent and North Africa and
French thought it "extremely doubtful if
between San Francisco and Australia.
any such machine would prove satisfactory"
. . ." " By June he reported that the
Radio Section of Signal Corps' Plant Divi- 12
(1) Memo, Stoner for Exec Control Div, Rpt
sion was purchasing four such sets of heavy 40, sub: Prog Rpt, 4-10 Jun 42, Item 1 b 2. SigC
duty radios. According to his report for the EC 319.1 Prog Annex, Evaluation Br, 17 May 42-
19 Jun 42. (2) Stoner, Memo, cited n. 2, Item la.
week ending 22 July, "a multi-channel This first Signal Corps ACAN multichannel
radiotelegraph system was placed in opera- radiotelegraph channel between Washington and
London was a high-quality radiotelephone for fixed
tion between WAR (Washington) and operation, engineered by American Telephone and
London using leased radio facilities of the Telegraph, using Western Electric carrier equip-
ment 40C1, modified to provide three two-tone
American Telephone and Telegraph Com- channels on one sideband of the radiotelephone
system. (3) Melia, Signal Corps Fixed Communi-
11
Memo, Stoner for CSigO, 27 May 42, sub: cations in World War II, p. 14. (4) Oakes, Army
Provision of multichannel telegraph circuits. SigC Command and Administrative Communications
320.3 BOLERO, May-Jun 42 (MT-24). System, Pt. II, pp. 39, 118.
224 THE SIGNAL CORPS
for use in the field since it demanded "ex- Radioteletype for the military took shape
tremely good signals and operating condi- during a series of conferences among repre-
tions." Field officers would not be dis- sentatives from the Signal Corps, American
couraged, however. On the contrary, they Telephone and Telegraph, and Press Wire-
went so far as to aspire to mobile RTTY, less during the late summer and autumn of
planning to combine it with such powerful 1942. They decided to use single sideband
field radio sets as the SCR-299. Thus Col. communication on a frequency shift (two-
Elton F. Hammond, at the headquarters tone) basis, making it possible to transmit
of the Desert Training Center, Indio, Cali- teletype signals by means of ordinary contin-
fornia, telephoned to Colonel O'Connell, uous wave radio equipment, rather than by
head of the General Development Branch in means of the more elaborate transmitters of
Washington, on 14 July: "I also would like radiotelephone quality. They conducted
to ask for radio teletypewriters. Would like tests on an experimental single-channel
at least six with the idea of installing them radioteletype circuit between WAR and the
in the radio trucks, [SCR-] 299's. I believe Press Wireless receiving station at Baldwin,
it would be of very practical use." 13 Long Island. The Signal Corps men in
Whereas Colonel French did not favor WAR transmitted through a 500- wat
the field demands, Maj. Vernon B. Bagnall, the transmitting station of the Army Com-
head of the Fixed Radio Branch in Army munication Service at Fort Myer, Virginia.
Communication Service, did. He asked the They assembled the receiving equipment
American Telephone and Telegraph Com- from commercial and special components
pany and the Bell Laboratories to figure out supplied by Press Wireless and the Bell Lab-
a way to make radioteletype work, using the oratories. Two Hammarlund Super Pro re-
five-unit code. The problem was to devise ceivers were used, together with the modified
suitable military equipment, single channel. CF-2A telegraph terminal equipment of the
On 28 August, Austin Bailey, an American type originally designed for operating tacti-
Telephone and Telegraph official, sent to cal typewriters on spiral-four cable. This
Bagnall his corporation's proposal to meet conglomeration worked so well that the
the Signal Corps requirements for a radio- Signal Corps decided to initiate procure-
teletype system. It would operate on diver- ment. The Air Forces wanted 12 sets at
sity principles, using two tones, and would once, especially for their Caribbean stations
permit the use of cipher machines working of the Army Airways Communications Sys-
with standard teletypewriters.14 tem. This would be only a starter, since hun-
13
dreds of single-channel military RTTY
(1) Ltr, Sanger to CG AGF, 6 Jun 42, sub:
Sig equip, with 3d Ind, CSigO (Col French writ- would follow, for use by the AACS and by
ing) to Hq AGF, 22 Jun 42. SigC 413.52 Teletype other military arms also.15
1, Jan-Jun 42. (2) Incl, Telephone conversation
between Hammond and O'Connell, Washington, 14 pany and Press Wireless, respecting modifications
Jun 42, with Ltr, Capt William M. Crook, Asst of the equipment. Ltr, Bailey to Bagnall, 10 Sep
Sig Officer Hq Desert Tng Center, Camp Young, 42, with Memo, R. B. Shanck, 8 Sep 42. In same
Calif., to O'Connell, 15 Jul 42, sub: Telephone file.
15
conversation. SigC 413.52 Teletype 2, Jul-Aug 42. (1) Melia, Signal Corps Fixed Communica-
14
(1) Ltr, Bailey to Bagnall, 28 Aug 42, with tions, pp. 16-18. (2) Oakes, Army Command and
attached Memo, 28 Aug 42. SigC 413.44 Radio Administrative Communications System, Pt. II, p.
Teletype, 1942-43. (2) Two weeks later Bailey 38. (3) Ltr, Bailey to Bagnall, 15 Oct 42, with
informed Bagnall of conferences between his com- Memo, recording conf among SigC, Press Wireless,
SIGNAL EQUIPMENT: WIRE AND RADIO 225
Carrier Equipment and Spiral-Four cuits with minimum current loss, far less
Readied for Use in War than the best that the standard field wire
W—110—B could provide under field condi-
While the Signal Corps developed effi- tions. (The light insulation of the wire al-
cient, increasingly automatic terminal lowed too much current to leak out, espe-
equipment to handle Army's wartime traffic, cially in wet locations; heavy insulation
its laboratories improved the efficiency of would make the wire more efficient as an
the wire links also. In the forefront of Sig- electrical conductor but too heavy for field
nal Corps' biggest wire developments during use.) Blair, although he believed these fac-
1942 was carrier equipment, whose appli- tors made the carrier system unwarranted
cation to military use was made possible by "at this time," nonetheless evinced prophetic
the perfection shortly before of heavy-duty foresight when he reported the matter to the
spiral-four field cable.16 Chief Signal Officer in May 1931. "It is
Carrier, a method which enables many possible," he wrote, "that there may be a
messages to speed over a single wire circuit requirement for the development of such
simultaneously yet without mutual interfer- equipment for operation on special circuits
ence, had been suggested to the Army years in the future." 17
earlier—in 1931 by a Signal Corps reservist, The possibility which Blair had foreseen
1st Lt. Clarence R. Kingston. His sugges- was more than that—it became an inevita-
tion, however desirable more and better bility. By 1940 the laboratories at Fort Mon-
communications for the military might be, mouth had projects afoot for "Carrier Tele-
ran into the disapproval of Maj. William phone Systems," several versions of which
P. Blair, then charged with the Signal Corps were already in wide commercial use.18 Ap-
Laboratories. The weight that the system plication to military uses would be assured
components entailed would be very great, in by the coincidence which, toward the end
terms of field wire equipment during the of 1941, brought together the efficient spiral-
1930's—no doubt about that. For the sys- four field cable with urgent demands from
tem would require what then seemed ex- field officers who insisted upon wire com-
cessive amounts of terminal gadgetry: oscil- munications far exceeding the limited ca-
lator, modulator, demodulator, filters, ring- pacity of their outdated field wire equip-
ing equipment, and auxiliary power supply. ment.
It would also require excellent wire cir- For years commercial communication
companies had been relying upon carrier sys-
Western Electric, Bell Telephone Labs, and AT&T,
New York, 5 Oct 42. SigC 413.44 Radio Teletype, tems to handle the huge and facile telephone
1942-43. The final RTTY product was of joint and telegraph traffic of America. Now the
Bell System-Press Wireless design, and was built by
the latter. Memo, Col Parker for Dir of Army Com
fast-growing Army wanted carrier facilities
Sv, 30 Dec 42, sub: Weekly digest of prog and
17
problems, 24-30 Dec 42. SigC 319.1, Drawer 483 (1) Ltr, Kingston to CG Third Corps Area, 15
AC No. 133, Weekly Digest of Prog and Problems. Apr 31, sub: Carrier set with rpt signed by King-
A good summary of RTTY development is con- ston, Carrier Set for SigC U.S. Army, 13 Mar 31;
tained in Memo, Bagnall for Lt Col Carl H. Hatch, (2) 4th Ind on Kingston Ltr, Blair to CSigO, 25
12 Nov 42, sub: Teletype equip for AACS and adm May 31. SigC 413.42 Carrier Sets 1, May 31-Dec
radio stations. SigC 676.3 AACS, 1942-44. 41.
16 18
For the origin of spiral-four field cable, see SCL, Annual Report, 1941, proj. 4-18, pp.
above, pp. 66—67. 38-39.
264-211 O - 78 - 16
226 THE SIGNAL CORPS
too. For example, on 12 December 1941, Lt. mounted as a military delegation on 12 April
Col. Fred G. Miller, signal officer at the inspected the progress which the laboratories
Third Army Headquarters, San Antonio, were making, both at Fort Monmouth and
Texas, had urged that tables of basic allow- in the research labyrinths of the companies.
ances include "carrier telephone and tele- On 11 May the Signal Corps Technical
graph equipment for the higher echelons." Committee recommended C carrier for
Major O'Connell, then charged with the standardization and did standardize it four
communication projects at the Signal Corps months after, on 7 September. The equip-
Laboratories, replied to Miller that the Bellment, in Signal Corps nomenclature, com-
Telephone Laboratories were co-operating prised: TC-21, or CF-1, C carrier ter-
with him toward a military system that minal equipment (telephone); TC-22, or
would provide three voice channels and four CF-2, C carrier terminal equipment (tele-
telegraph channels over one circuit (C car- graph, teletypewriter); TC-23, or CF-3,
rier). The system had not yet been com- C carrier repeater; and TC-24, or EE-100
19
pletely developed. (later EE-101) ringing equipment.20
However, O'Connell received assurances Standardized but not yet procured or
in February 1942 from A. B. Clark, Director tested, C carrier by mid-1942 held the
of Systems Development at the Bell Labora- precious promise of heavy-duty commer-
tories, not only that there would be no haz- cial-type communications for the Army,
ard in placing large orders for the C carrier without which the 50-million-words-a-day
at once, without field tests, but also that the
work load, commonplace by the war's end,
first models could be delivered to the Signal could never have been attained. Such was
Corps by April or May, and the Signal
the promise held forth in 1942, not by C
Corps went ahead with the standardization
carrier alone, but rather by carrier tech-
of the equipment. Like a number of other
niques generally, working in conjunction
Signal Corps items of equipment, such as
the coast defense radar SCR -582, forspiral-four
with which cable, teletypewriter, and
so dire and sudden a need had sprung up 20
(1) Ltr, Clark to O'Connell, 23 Feb 42; (2)
after Pearl Harbor, C carrier had become Memo, Capt M. M. Bower and Others for O'Con-
so desperately desired in 1942 that the Army nell, 23 Apr 42, sub: Brief account of inspec trip,
decided to accept and standardize it with- 12 Apr 42, to Ft. Monmouth, Bell Telephone Labs
Inc., and International Telephone and Radio Com-
out the customary service tests. It was ac- pany, by Bower, Coller, and Bedford, Wire Sec Gen
cepted on its promises. Dev Div. SigC 413.42 Carrier Sets 1, Jan-Jun 42.
C carrier for the Army was to be per- (3) Ltr, O'Connell to Dir of SCGDL, 15 Jul 42,
sub: Nomenclature for carrier sets. SigC 413.42
fected soon thereafter, phenomenally soon— Carrier Sets 2, Jul-Dec 42. (4) Signal Corps
in fact, by August 1942, and largely because Information Letters, No. 7 (January, 1942), pp.
of the million-dollar orders for the heavy- 45-46, 74-75; No. 11 (October, 1942), pp. 17_18,
22-23. (5) SigC Tech Committee Mtg 214, 11
duty carrier which the Army Air Forces had May 42. See OCSigO R&W Action 7, SCTC to
laid upon the Signal Corps for Air Defense Equip Coord Div, 11 May 42, sub: 1000-20 cycle
ringing equip for SigC use. SigC 413.42 Carrier
needs. In the meantime, enthusiasm Sets 1, Jan-Jun 42. (6) SigC Tech Committee
Mtg 229, 7 Sep 42. See OCSigO R&W Action 3,
19
Ltr, O'Connell to Sig Officer Third Army Hq, Maj R. O. Franzen, SigC Gen Dev Br, to S&I Br,
31 Dec 41, sub: Telephone and telegraph carrier. 14 Sep 42, sub: Carrier telephone equip and spiral-
SigC 413.42 Carrier Sets 1, May 31-Dec 41. four cable. SigC 413.42, Carrier Sets 2, Jul-Dec 42.
SIGNAL EQUIPMENT: WIRE AND RADIO 227
radioteletype. The conditions which Blair Considerable time would yet pass before
had prophesied in 1931 had, indeed, ar- the production of carrier equipment got roll-
rived in 1942, creating demands which, like ing. Neither the cable nor the terminal sets
so many other demands on the Signal Corps, would become available in any quantity be-
such as that for radar and FM tank radio, fore 1943. Meanwhile, the initial driblets
came with extreme urgency and explosive were invaluable for Signal Corps experi-
pressure. mentation. Though the Signal Corps had
Meanwhile, the first models, which standardized carrier equipment, antici-
Clark had over optimistically
pating that it wouldassured the
perform well, Signal
Signal Corps for April or May, did not ar- Corps troops had yet to find out how to
rive. In June Western Electric, manufac- handle it in the field, to discover what sort
turer for the Bell Laboratories, concluded of crews could best manipulate it and how.
it could promise no production before No- They also had to discover what the opera-
vember, even with the highest priorities, tion and maintenance requirements might
which the development did not then have. be.24
(Other equipment devouring copper, alu- Before the summer's end, General Col-
minum, and electrical components such as ton, head of the Signal Supply Service in
21
meters, enjoyed higher priority.) Washington, thanked both Dr. O. E. Buck-
Pressed to the utmost and blessed with ley, president of the Bell Telephone Labora-
higher priorities (AA-1, granted by the tories, and Fred Lack for their efforts in
Joint Army and Navy Munitions Board), speeding C carrier. The first deliveries of
together with help in the person of a special
some of the system components had already,
expediter from Signal Corps' Production
early in August, begun arriving at Fort
Expediting Section, Western Electric was
22 Monmouth. Fortuitously and fortunately,
soon able to speed its carrier development.
On 1 August, Fred R. Lack, vice president only a few days earlier, late in July, the
of Western Electric, promised the first three General Development Laboratory at the
carrier sets by the twenty-second of the fort had received its first consignment of
month, whereupon General Olmstead in production spiral-four (150 miles of the
turn committed them to the 62d and to the first order, stipulating 1,500 miles) "for im-
928th Signal Battalions for field tests in late
1942 maneuvers.23 manders of these two battalions that they would
receive for autumn field tests the following: 2
21
Memo for File, Capt Franzen, 24 Jun 42, sub: Telephone Terminals CF-1 (Carrier) ; 2 Telegraph
Inability of Western Electric Company to deliver Terminals CF-2 (Carrier) ; 5 Telephone Repeaters
carrier systems with present priorities. SigC 413.42 CF-3 (Carrier); 8 Ringing Sets EE-100-T1; 30
Carrier Sets 1, Jan-Jun 42. six volt storage batteries; and 9 power units.
22
OCSigO R&W Action 3, Maj G. J. Filiberti, All of this with necessary auxiliary apparatus, the
SigC Prod Sec, to Gen Dev Br [O'Connell], 23 Jul whole weighing tons, was intended for field use,
42, sub: Expediting of carrier equip ordered on despite its ponderous bulk. Ltrs, CSigO to CO
DP 42-T-600. SigC 413.42 Carrier Sets 1, Jan- 928th Sig Bn, Camp Upton, N. Y., and to CO
Jun 42. 62d Sig Bn APO 308, Leesville, La., 22 Aug 42,
23
(1) Ltr, Lack to Capt A. L. Chilman, Con- sub: Shipment of carrier systems for spiral-four
tracting Officer OCSigO, 1 Aug 42; (2) Ltr, cable.
24
In same file.
CSigO to CG SOS, 21 Aug 42, sub: Shipment of By December, the Signal Corps Technical In-
first three carrier systems—spiral-four cable. SigC formation Letter, No. 13 (December, 1942), pages
413.42 Carrier Sets 2, Jul-Dec 42. 6-14, would disseminate to the field first instruc-
On 22 August the CSigO informed the com- tions in the use of the spiral-four cable.
228 THE SIGNAL CORPS
mediate tests on the carrier equipment."25 semblies called CC-358. They found, de-
Wire engineers from the laboratories of the spite their inexperience, that they were able
Signal Corps and the Bell System laid four to lay it, using conventional field wire
20-mile loops of the cable over the coun- equipment, as fast as five miles an hour
tryside around Monmouth and tested them during daylight. By night, under blackout
for conductivity. Then on 4 August they conditions, they could lay up to three or
linked three of the loops together in one four miles an hour, this despite rain and
continuous 60-mile circuit incorporating accidents, such as on the occasion their
the newly delivered carrier equipment. heavy 2½-ton truck carrying the cable reels
They placed a telephone terminal, CF-1 and pay-out motor reel (RL-26-A) ran off
or TC-21, at each end and two repeaters, the road and cut the cable. Transmission
CF-3 or TC-23, along the cable, presum-
both over a ten-mile and over a twenty-
ably at each 20-mile joint. All this the ex-
mile stretch was reported to be "very satis-
perts supervised and operated success-
fully. 26 factory." 27 In October, during the Second
Army maneuvers, the 262d Signal Con-
Not until the very end of August did
struction Company got its first field cable ex-
the first field test by the troops on maneu-
perience, laying in one night ten miles of
vers take place. During 28-30 August mem-
the cable during five hours of heavy convoy
bers of the 62d Signal Battalion laid spiral-
traffic, dust, and blackout. Though some
four, using the one-quarter-mile cable as-
mechanical defects turned up, which ex-
25
(1) Ltrs, Colton to Buckley and Lack, 1 Sep perience both in manufacture and in field
42. SigC 413.42 Carrier Sets 2, Jul-Dec 42. (2) use would eliminate, 1st Lt. George W.
Ltr, CSigO to Dir of SCGDL, 17 Jul 42, sub:
Shipping instructions for cable assembly CC-358. Good reported that the cable was "en-
SigC 413.43 CC-358, No. 1, Jan-Jul 42. (3) Sig- thusiastically received by the men and of-
nal Corps Information Letter, No. 8 (July, 1942),
p. 12.
ficers who have handled it." 28
26
(1) Memo for File, P. L. Bedford, Asst Elec Obviously this new cable was already a
Engr Gen Dev Br, 6 Aug 42, sub: Rpt of Bedford success in the field. And there was no doubt
re temporary duty at SCGDL, 30 Jul-4 Aug 42.
SigC 413.42 Carrier Sets 2, Jul-Dec 42. of the coming success of carrier equipment
The Signal Corps desired that technical advisers either, although for the time being full pro-
both from its own laboratories and from industry
attend the contemplated maneuvers using carrier—
duction tarried as a result of priority trou-
so General Olmstead informed the Commanding bles and shortages of raw materials and
General, AGF, on 24 August, at the same time ac- components. Carrier terminal sets would be
quainting him with the new development as
follows: heavy—for example, the first telegraph-
"The Signal Corps has recently standardized new teletypewriter terminal, TC-22, involved
carrier equipment and a new spiral-four cable for
transmitting 4 voice channels over long distances.
two cabinets which totaled over a thousand
Because of the lack of standard long distance tacti-
27
cal communication facilities other than open wire Ltr, Lt Col E. B. Williams, Hq 62d Sig Bn,
line which cannot always be used, carrier equip- Leesville, La., to CSigO, 31 Aug 42, sub: Cable as-
ment and associated cable were standardized and semblies CC-358. SigC 413.43 CC-358 No. 2,
procured without service test." (2) Ltr, CSigO to Aug-Dec 42.
28
Dir of SCGDL, 24 Aug 42, sub: SCGDL tech Memo, Good for Maj Arthur A. McCrary, 21
advisers at maneuvers; (3) Ltr, CSigO to CG AGF, Oct 42, sub: Rpt of Sig activities during Sec-
24 Aug 42, sub: Civilian tech observers at maneu- ond Army maneuvers, 12-18 Oct 42. File cited
vers. SigC 413.42 Carrier Sets 2, Jul-Dec 42. n. 27.
SIGNAL EQUIPMENT: WIRE AND RADIO 229
pounds, not counting the power equipment provide nonstandard engine generators and
29
and sundry accessories. batteries.30
Nonetheless, a carrier cable line 100 miles
long would weigh far less, and could be in- Ground Radio and Radio Link or Relay,
stalled in far less time, than a 100-mile pole Transformed by FM
line of equal traffic capacity. Before the end
of 1942 Colonel Magee, chief of the Equip- By the last half of 1942 the efforts of the
ment Coordination Branch in Washington, Signal Corps in research, development, pro-
would write that "the need for this curement, and distribution pretty well met
equipment in almost every theater of op- the radio needs of those who pressed hard-
eration has been apparent to all concerned est among the ground troops—the men of
for over a year. When equipped with car- the Armored Force. The demand for Ar-
rier telephone equipment," Magee sum- mored Force radio types, initiated in 1940
marized these new blessings, "Spiral-Four by Capt. Grant A. Williams, had already
Cable will provide long distance facilities been or was being well satisfied—Type I
which can be placed in service by troops in (for long range) by SCR-299; Type II
(for medium range) by SCR-505, which
less than one-tenth the time and with one-
was still under development while the older
fifth the material required for the most
SCR's-193 and 245 substituted well; Types
rapid type of pole line construction which III and IV (for short range) by SCR-508,
will provide equal facilities. Equipment for 528, 538, 509, and 510. In the III and IV
a 100-mile Spiral-Four Cable carrier sys- types FM had completely captured the af-
tem, including cable reels, weighs 39 tons. fections of the tankmen.
Equipment for 100 miles of rapid pole line Late in August 1942 Lt. Col. William P.
would weigh approximately 240 tons. Withers, an Armored Force officer who, like
Equipment for a standard pole line 100 miles
long would weigh 870 tons." Magee noted 30
OCSigO R&W Action 1, Magee to Dir of
also that no deliveries (after the rushed de- Planning, 21 Dec 42, sub: Need for carrier equip
with spiral-four cable. SigC 413.42 Carrier Sets 2,
livery of three sets in August) had been Jul-Dec 42. Major Bower noted on 30 November
made on the carrier during September, Oc- 1942 that "whereas a single construction platoon
can construct only from 2 to 5 miles of open-wire
tober, or November, because of "inadequate line a day, depending upon the type of construc-
priorities to obtain a small number of com- tion, availability of supplies and nature of the ter-
rain, it will be perfectly feasible for the same unit
ponents." There had been an "urgent re- to construct and place in operation from 50 to 100
quest for this equipment from task forces miles a day of Spiral-Four Cable equipped with
in October," he remarked, yet it could not carrier." Memo for File, Bower, 30 Nov 42, sub:
Discussion of organizational rqmts for opn of spiral-
be fulfilled. Not until early December would four cable carrier system. In same file.
five systems be delivered, and then only The virtues of spiral-four carrier in terms of ship
tons (together with the still greater virtues of radio
because extraordinary efforts were made to link equipment) were proclaimed by Maj. E. E.
Boyer, Signal Corps, in an undated account en-
29
TM 11-487, Electrical Communication Sys- titled Radio Link Equipment, filed with other
tems Equipment, 2 Oct 44, p. 220. The CF-2-A papers in SigC OP 334 [C&E] Case 31, entitled
telegraph terminal weighed 530 pounds per bay, A Study of Frequencies Available for Signal Corps
this being a metal box 5/2 feet high by about 2 Radio Sets and Recommendations for Their Use,
feet wide and 2 feet deep. Feb 42-Aug 43.
230 THE SIGNAL CORPS
Williams, had long labored with the Signal Withers' thanks re-echoed throughout
Corps toward modernizing the tankmen's the Armored Force in proportion to the
communications, expressed his apprecia- ever wider distribution of the "500" radio
tion of Signal Corps efforts just after he had series. Everyone loved to push the buttons
taken command of the 37th Armored Regi- and talk over the air, especially the officers,
ment at Pine Camp, New York. Withers despite regulations against excessive use of
warmly thanked Colton, head of the Signal radio transmissions. After a month at Pine
Supply Service, and his helpers, naming in Camp, Withers again wrote to O'Connell
particular O'Connell, Rives, Elder, and saying that these sets enjoyed huge favor,
Hildreth, all associated with the heavy du- with the result that the Signal Corps had
ties of both developing and procuring risen high in the opinion of the field
Army's communication facilities. Here in troops—quite a contrast with the Corps'
the thick of the Signal Corps battle of pro- reputation during the 1940 and 1941
32
duction, wherein Olmstead and Colton re- maneuvers. "Generally speaking," he told
ceived many more brickbats than bouquets, Ltr, O'Connell to Withers, 22 Sep 42. SigC 413.44
Withers' appreciation must have been en- Armored Force (Sets) 1942-43.
couraging indeed.31 32
In the words of a memorandum for the Chief
Signal Officer in September 1940, "Some of the
31
( l ) L t r , Withers to O'Connell, 28 Aug 42; (2) observers at the recent maneuvers stated their belief
SIGNAL EQUIPMENT: WIRE AND RADIO 231
O'Connell, "the radio is splendid and is idle. . . . From the field point of view,
actually furnishing more communications especially considering present and past diffi-
than we have ever had. If we can ever per- cult conditions, the Signal Corps is doing a
suade the high command that it is strictly fine job." 33
a battalion set, and not a headquarters tele- Rather often the pushbutton tuning
phone, I won't worry nearly so much about mechanisms got out of order, generally be-
communication . . . the Commanding cause of inexperienced operators, who, with
General . . . has to resist attempts of of- unwarranted confidence, tinkered with the
ficers senior to him, mainly in the Division adjustments, especially when they could not
Headquarters, to grab sets from line units. get good reception, a condition not uncom-
. . . Most officers are entranced with this monly encountered by ground troops in
FM and just can't bear to see a microphone deep valleys or depressions where very high
frequency waves are naturally blacked out
that our Army signal equipment is behind com- by absorbing objects or blocking terrain.
mercial development." Memo, CofS for CSigO, 7
33
Sep 40, OCS 16281-6. Mark Skinner Watson, Chief Incl, Personal Ltr, Bill Withers to Jim, 26
of Staff: Prewar Plans and Preparations, UNITED Sep 42, with Ltr, Maj S. E. Petrillo, SigC, to Maj
STATES ARMY IN WORLD WAR II (Washing- William S. Marks, Jr., SCGDL Fld Lab No. 1,
ton, 1950), p. 49. See also Terrett, The Emergency, Camp Coles, 13 Oct 42. SigC 413.44 (SCR-508>
pp. 160, 176-77. 3, Aug-Dec 42.
232 THE SIGNAL CORPS
Expecting too much, in ignorance of VHF- the British No. 22, the last three all being
FM characteristics, the receiver operators AM radios). In the course of the tests, con-
generally cursed the transmitters or fiddled ducted in the vicinity of Fort Monmouth
with their receiver adjustments. Actually, and among the mountain ridges of the Alle-
the aligning adjustments in an FM receiver ghenies near Bethlehem, Pennsylvania, the
or transmitter are very exacting and even SCR-508 proved better than the No. 19.
require special FM test equipment (AM Although the British set was smaller and
test sets will not do). While the Signal Corps consumed less power, the disadvantages of
men tried to instruct and restrain the over- its amplitude modulation (subject to static
zealous operators, Colonel Withers resorted and interference), its numerous tuning con-
to the expedient of assigning men to ride in trols, and its lower frequencies (falling in
the vehicles of the 37th "merely to watch the crowded, noisy 2-8 megacycle band), all
the officers and the men use the radio, in the militated against it.35 O'Connell, returning
hope of learning what queer things they do from the field tests near Bethlehem, reported
to cause the trouble [with the tuning ad- to Olmstead on 10 October that "the
justments]." 34 marked superiority of the SCR-508 and
Even so, FM vehicular short range radios SCR-300 [compared with the No. 19 and
operating in the very high frequencies above No. 48 respectively] for reliability of com-
36
20 megacycles had completely captivated munication was clearly determined."
the Armored Force. These were, of course, As if the multiplicity of the 500 and the
the 500 series sets: SCR-508,528, 538, 509, 600 radio series was not enough, both series
and 510. Likewise, the corresponding 600 doubled in number during 1942 with an
series of sets were now winning the affections SCR-700 and an SCR-800 series—all be-
of the Field Artillery men. Now, too, the cause of anticipated crystal shortages.37 Each
British became interested; FM military 500 set required up to 80 crystals, one for
radio was something new under the sun. To each radio channel which the Armored
make comparisons, they brought over their Force might wish to use; each 600 set re-
conventional AM wireless radio No, 19, quired up to 120 crystals to cover the Field
which operated in the high frequencies only, Artillery's span of allotted channels. The
far below the very high frequencies of the total crystal requirement naturally became
American FM sets. From 28 August to 2 astronomical, especially since other sets were
October 1942, the Signal Corps arranged a calling for crystals too, for example, SCR-
series of tests between the 508 and the No. 35
Ltr, Col Maier, Dir of SCGDL, to CSigO, 7
19 (also between the Infantry's new walkie- Nov 42, sub: Comparative tests of British and
talkie, the FM SCR-300, and the British American radio sets with Incl 1, Summary of Com-
parative Test SCR-508 and B-19, and Incl 2,
No. 48; and also between the SCR-284 and Memoranda Comparative Tests SCR-300 vs B-48
and SCR-284 vs B-22. SigC 413.44 (SCR-508)
34
(1) Ibid., together with second Incl on Pe- No. 3, Aug-Dec 42.
36
trillo—Marks Ltr, unsigned and undated Memo, Memo, O'Connell for CSigO, 10 Oct 42, sub:
Radio Repair Officer, Div Radio Maint, 144th Rpt of trip to Bethlehem, Pa., 29 Sep-1 Oct 42.
Armored Sig Co, Pine Camp, N. Y., for Div Sig SigC 413.44 Gen (Sets) 4, Sep-Oct 42.
37
Officer. (2) Memo, Capt Lawrence C. Sheetz, SigC Contrast all this proliferation of radio with
for Col Magee, 12 May 42, sub: Rpt on trip to Ft. General Marshall's unrealistic order to Olmstead,
Benning by B. V. Blom. SigC 413.44 (SCR-508) in October 1941, to reduce radio types. Terrett,
No. 2, Jan-Jul 42. The Emergency, pp. 294ff.
SIGNAL EQUIPMENT: WIRE AND RADIO 233
245, 299, 511, and 536. This demand, it Master-oscillator systems, which had
seemed for a while, could not be met from been devised to hold radio circuits to their
the critical supply of high grade quartz from exact operating frequencies, had long been
which the crystals were cut. The supply was a subject of research in the Signal Corps
short, to say the least, and very remote (the Laboratories and in industrial laboratories
only good sources being in Brazil and in also. Now these efforts led to successful
India). Moreover, there was a still more crystal-saving radio designs, reducing the
critical shortage of craftsmen and equip- 80 crystals of the 508 sets and the 120 crys-
ment to prepare the delicate quartz crystal tals of the 608 series to but one crystal a
wafers. All these considerations led the Sig- set, which was used to calibrate four mas-
nal Corps into a frantic effort to devise ter-oscillator circuits, providing four pre-
means of reducing its crystal needs while re- tuned channels (six less, unfortunately,
taining the indispensable advantages which than the ten channels of the original multi-
crystal-controlled pushbutton radio sets crystal sets). In the 509/10 and 609/10,
could offer. the reduction was less drastic, each set still
The new crystal-saving series (the 700's requiring 19 crystals per set. Known at first
paralleling the 500's; the 800's duplicating as 508-XS, 608-XS and so on (the XS
the 600's) had begun to take form even be- meaning "crystal saving"), the new ver-
fore any of the original series reached mass sions acquired formal status in September
production. On 22 November 1941 the Sig- 1942 as SCR-708 and so on (the 700 se-
nal Corps Laboratories had contracted with ries) for the Armored Force III and IV
the Zenith Radio Corporation for three mul- sets, SCR-808 and so on (the 800 series)
tichannel master-oscillator FM transmitters for the Field Artillery counterparts.39 By
and six receivers, embodying a crystal-con- then the crisis in the crystal supply was sub-
serving system. E. F. McDonald, president siding. Drastic measures to provide radio
of Zenith, had hoped to complete the con- crystals in quantity proved successful. Con-
tract sooner than the ninety days which the sequently, the 700 and 800 series were not
Signal Corps had specified. Usually in elec- needed in World War II. Yet the effort
tronic production, harassed by supply short- spent on their development was by no means
ages, priorities, and design changes, such lost since crystal-saving techniques would
hopes prove impossible to realize; but not so be incorporated in postwar vehicular ra-
in this case. McDonald wrote to General dios.40
Olmstead on 21 February 1942 that he was Meanwhile, by the late summer of 1942
"happy to say that the three transmitters the Infantry's first and only FM radio to
are finished and the receivers will be Mon-
day." He could not refrain from concluding 39
OCSigO Engr and Tech Div, History of Signal
triumphantly, "I like to make good on a Corps Research and Development in World War
II, VIII, Pt. 2, projs. 813-A and B, and Pt. 3,
promise of delivery." Needless to say, the projs 822-A and B.
40
Signal Corps was pleased too, as Olmstead By 1950 the crystal-saving circuits would be-
come universal, resulting in "a requirement of 11
hastened to reply.38 to 21 crystals per set versus a comparable require-
ment of 80 to 120 in World War II series." Col
38
Ltr, McDonald to Olmstead, 21 Feb 42, and E. R. Petzing, "Engineering the Integrated Com-
reply, CSigO to McDonald, 28 Feb 42. SigC 413.44 munications System," Radio and Television News
Armored Force (Sets), 1942-43. (December, 1950), p. 39.
234 THE SIGNAL CORPS
be used in World War II had reached the other. Military FM, in the form of the
stage of field tests. This was the new walkie- SCR-300, entered the forward fighting
talkie SCR-300 destined to fulfill "the In- units in time to confer great benefits and to
fantryman's dream for better communica- prepare the way for the integrated com-
41
tion and control of troops by radio." Run- munications of the future Army.
ning the usual gantlet of tests prior to pro- By 1942 FM had thus wrought a revolu-
duction, the SCR-300 had to take few tion in the Army's vehicular short-range
blows. At the Signal Corps General De- radio communications. Before the year was
velopment Laboratory, the Field Radio out, FM was helping to bring on another
Communication Section (located in Camp revolution. Used in radio link or radio re-
Coles, New Jersey) reported that only lay equipment, it would link together
minor mechanical and electrical defects had breaks or gaps in wire lines. Indeed, it
turned up in the service test models which would soon replace wire altogether. The in-
the Galvin Manufacturing Corporation itial notion restricted the use of link equip-
and the Philco Corporation had offered. ment to the jumping of spiral-four or wire
This new FM radio not only survived the line traffic across rivers and over land ob-
tests well but at the same time dealt heavy stacles. This idea quickly broadened into
blows against its competitors in the Infan- the concept of a chain of radio links, a suc-
try, even against the newest AM sets which cession of stations which could repeat sig-
had only recently come into the hands of nals from hilltop to hilltop over scores and
the troops, SCR-284, 511, and 536. Com- hundreds of miles, entirely without wire.
pared with them, with the British No. 19, But the limited idea of using radio to link
let alone with the older and original Ameri- together the interrupted ends of a wire
can walkie-talkie, SCR-195, the new SCR- line came first, and the Signal Corps lab-
300 conspicuously outdid them all. "These oratory workers were giving it thought
tests," according to the laboratory report when, in mid-1942, the airmen started
for September, "indicated the great superi- thinking too, in a bigger way, of depending
ority of frequency modulation for short upon radio instead of upon wire to link
42
range front line communication . . . ." their ground units, even when they were in
Not until the postwar period would all a fixed location.43
Infantry short-range radios, including the In particular, the Air Forces Aircraft
handie-talkie, become FM, integrating the Warning Service nets required huge
foot soldiers' sets with those of the Ar- amounts of communication lines, a require-
mored and the Artillery arms, so that all ment that had already given great impetus
could intercommunicate. During the war, to spiral-four and carrier developments.
into which the Army was now daily plung- Every radar site, every observation post in
ing deeper, front-line infantrymen suffered the Aircraft Warning Service, had to be
from a diversity of radio types, both AM linked to an information center, for exam-
and FM, which could not talk with each ple; and wire or cable, however improved,
41
entailed too much bulk and bother. The
John J. Kelleher, "VHF and Microwave Mili-
43
tary Communication Systems," Signals, I: 4 Interv, SigC Hist Sec with Capt Oliver D.
(March-April, 1947), p. 47. Perkins and J. H. Durrer (formerly assisted Co D,
42
SCGDL Prog Rpt, Sep 42, Pt. 1, proj. 10-3, 829th Sig Sv Bn, in North Africa and Sicily),
p. 2. Jan 45.
SIGNAL EQUIPMENT: WIRE AND RADIO 235
airmen had already been using AM radios Command in Florida. The airmen com-
when they could get them, such as SCR's- plained that in some forty observation posts
177, 188, 197, and the commercial Halli- along the Atlantic coast "it is highly im-
crafters HT-4, parent of the SCR-299.44 practicable to provide telephone communi-
They could not get enough of them, and cations." They wanted specifically a num-
anyway these AM transmitters radiated ber of SCR-298's, FM sets built by Fred
widely in the high frequencies (which re- M. Link for umpire use in Army maneuvers.
bound from the sky's ionosphere), so that The Signal Corps received the idea coolly,
the reflected radiations interfered with the especially since SCR-298's were not stand-
operation of other radio nets far away over ard Army sets. Would not some standard
the horizon. Would not VHF FM, with equipment do? "Radio Sets SCR-298 and
its line-of-sight limitations, be better? In SCR-298-A," the Chief Signal Officer ex-
July 1942 General Arnold made just this plained, "are non-standard equipments
suggestion. He suggested to General Olm- originally procured as 'Umpire' sets." Re-
stead that for fixed SCR-271 air search membering General Marshall's insistence
radar stations, "FM radio equipment can that radio types be reduced, Olmstead
be used to provide radio communication added, "In an effort to comply with the
channels where line-of-sight or ground wave Chief of Staff's directive to reduce the num-
transmission is feasible." 45 A month later ber and types of equipment, every effort
Arnold asked for no less than 700 FM re- should be taken to utilize the present stand-
ceivers and transmitters, saying that "392 ard equipment that is capable of perform-
each of these receivers and transmitters are ing the required functions." 47
required to provide communications be- Standard or no, the AAF would get what
tween fixed radar sites." The rest, he added, it wanted, FM radio for "point-to-point op-
would "provide radio links between units eration" in this case. In September it de-
46
of SCS-2 and SCS-3 systems." This was manded and got, not 40 but 100
not radio merely to link up gaps in wire sys- SCR-298's. Again, later that month, the
tems ; it was radio replacing wire altogether. AAF asked for a small delivery of 38 FM
Another Air Forces call for FM radio as- sets as a special issue to be provided "for a
sistance to the Aircraft Warning Service special operation by an organization acti-
vated under a special table of basic allow-
came in August 1942 from the III Fighter
ances. The organization," the Air Forces
44
7th Ind, CG Hq Eastern Defense Comd to added, "is scheduled to move overseas be-
CofS, on Ltr, CG I Fighter Comd to CG AAF, 9 fore October 15." 48 Col. Will V. Parker, in
Aug 42, sub: Radio equip for AWS. AAG 413.4-
47
S Com Equip. Ltr, CG III Fighter Comd to CSigO, 4 Aug
45
(1) 4th Ind, CG AAF to CSigO, 25 Jul 42, 42, sub: Request for radio sets, with 3d Ind, CSigO
on Ltr, CG AAF to CSigO, 29 May 42, sub: Radio to CG III Fighter Comd, 12 Sep 42. AAG 413.4-S
sets SCR-270 ( ). AAG 413.4-N Com Equip. (2) Com Equip.
48
Memo, Lt Col Robert E. Burns, Exec Officer, Ra- (1) Ltr, Col Saville, Dir of Air Defense, to CG
dar Div, for Exec Control Div, 31 Jul 42, sub: III Fighter Comd, 11 Sep 42, sub: Proc of one
Weekly digest of prog and problems, Radar Div, hundred SCR-298 radio sets for forestry tower ob-
week ending 30 Jul 42, p. 1. Weekly Achievements servation posts, with 5th Ind, CSigO to CG SOS,
Rpts, 17 July-19 Aug 42. SigC Central Files. 21 Oct 42. AAG 413.4-S Com Equip. (2) Ltr, Col
46
Ltr, CG AAF to CSigO through CG SOS, 28 Marriner, AAF Com Officer, to CSigO, 25 Sep 42,
Aug 42, sub: Proc of FM receivers and transmitters sub: Special issue of FM radio sets. AAG 413.4-Q
for radio links. SigC 413.44 Radio Link 1942. Com Equip.
236 THE SIGNAL CORPS
Plant Division, reported on 30 September The pressure for radio link prevailed and
1942 that these 38 FM sets had been the new FM techniques swept away the ob-
shipped the day before.49 jections which had been raised against mili-
Although the Air Forces insisted, some of tarizing AM radio link (the chief objection
the Signal Corps men responsible for new being that very high frequency AM radio
developments felt doubts. At least, they connections would be impractical in any lo-
were doubtful of the need to develop radio cation but a fixed station under careful con-
link equipment for the sole purpose of clos- trol ). Now the picture changed almost
ing gaps in wire lines (evidently the notion overnight, according to John J. Kelleher, a
of far-reaching radio relay had not yet, in radio engineer in the Engineering and
the summer of 1942, become firm). Devel- Technical Division of the Office of the
opments of great importance so often begin Chief Signal Officer. It changed with the
only half-recognized or, worse, as tentative coming of VHF FM equipment. The new
trials shrouded in the uncertainty which development, Kelleher asserted:
only time and tests can clear away. For
. . . completely negated the prejudice against
example, both the subsequently indispensa- radio links; provided a radio transmis-
ble handie-talkie and the SCR-299 had be- sion facility that had none of the faults
gun as tentative stopgaps.50 FM radio itself of high frequency; was extremely small,
long suffered from hesitant skepticism. In rugged, easily portable, yet had many of the
August 1942, when the idea of radio link attributes of a high quality wire circuit. Audio
levels could be maintained within close limits
was beginning to mature as a laboratory over long periods of time because fading was
project (requested by the General Develop- practically non-existent at those portions of
ment Branch in the Washington office as a the spectrum; signal-to-noise ratios were
means of jumping carrier cable signals amazingly high, right out to the maximum
range of the circuit; most important, multi-
across an obstacle), the General Develop- path distortion was completely absent and the
ment Laboratory at Fort Monmouth re- fidelity of the circuit could be held at a level
garded the need for so special an under- that permitted relaying the signals by tandem
taking as "doubtful." 51 obtained when service tests have been made of
49
three Signal Corps radio sets which provided single
Memo, Parker for Dir of Army Com Sv, 30 circuit radio extensions of wire lines."
Sep 42, sub: Weekly digest of prog and problems, Some Signal Corps men were for, some against,
23-30 Sep, Item 1 1C. SigC 319.1 Drawer 483 AC developing radio link. Colonel Magee in the Equip-
133, Weekly Digest of Prog and Problems. ment Coordination Branch and Major Bagnall in
50
See above, pp. 75-76. Plant inclined to thumbs down. Colonel Thomas
51
Signal Corps Technical Information Letter, in War Plans Division and Colonel O'Connell in the
No. 9 (August, 1942), pp. 21-22, reported as General Development Division favored it. O'Con-
follows: nell, especially, thought radio link might be "ex-
tremely useful," even suggesting that it might be
"Radio Link for Spiral-Four Cable"
used "for the rapid extension of the carrier system
"An investigation has been made at the request beyond the end of the Spiral-Four Cable," this last
of General Development Branch of the need for usage suggesting what radio relay soon became.
special radio equipment to extend all the tele- OCSigO R&W Action 2, Magee to Gen Dev Div,
phone and telegraph facilities of the Spiral-Four 13 Jun 42, sub: Intermediate radio link for carrier
Cable over water crossings or unpassable terrain. system spiral-four cable; Action 2, Bagnall to Equip
It was found that the need for developing special Coord Div, 16 Jun 42, same sub; Action 2, Thomas
equipment for the sole purpose is doubtful. Gen- to Equip Coord Div, 17 Jun 42, same sub; Action
eral Development was informed of this and also 1, O'Connell to Equip Coord Div, 23 May 42, same
that further information on the problem will be sub. SigC 413.44 Radio Link, 1942.
SIGNAL EQUIPMENT: WIRE AND RADIO 237
connected receivers and transmitters, far be- operate as telephones, were preferred. More-
yond the horizon range of a point-to-point over, in some equipment, such as radio re-
52
circuit.
lay and radioteletype, automatic security
In moving toward radio link, the Signal devices (code or, more accurately, cipher
Corps General Development Laboratory machines) rendered the communication as
at Camp Coles, near Fort Monmouth, inaccessible to the enemy as were the mes-
sought to modify existing Signal Corps FM sages carried by wires. In short, the user of
sets SCR-608 and 610, then turned to com- radio relay equipment communicates by
mercial equipment, to Western Electric's means of the familiar telephone or teletype-
Model 31A and to Fred Link's Model 1498. writer exactly as though wire made the con-
By November the laboratory engineers, de- nections. Indeed, some of the connections
ciding that the Link model showed most may be by waves channeled along wires
promise, contracted with the Link Corpora- while other portions of a circuit are linked
tion for twenty development sets which by radio waves beamed through space. In
Link would deliver in 1943 and which the the radio relay system, according to a Signal
Signal Corps would dub "antrac 1," Corps officer, "we have a marriage of wire
that is, AN/TRC-1. It was a development and radio." 55
of tremendous significance for the future of At the end of World War II, the mem-
communications.53 bers of the Institute of Radio Engineers
Radio link, amplitude modulated, had were to hand a bouquet to the Signal Corps
existed commercially before the war in a for its work in meeting the challenge that
few limited applications adapted for fixed the communication needs of modern war
operation. Now the Signal Corps converted presented. Field commanders would praise
it to frequency modulation, took it out into the superior equipment which the Signal
the field, reduced its girth, and toughened Corps had provided, superior largely be-
it for mobile warfare. Its first application cause of increasingly extensive use of fre-
to war would soon come in North Africa, quency-modulated radio in the range of
and not merely in order to plug small gaps 20 to 100 megacycles.
in wire systems but in order to relay radio
signals over hundreds of miles, supplanting Signal Corps Provides VHF Command
long lines of poles and wire.54 Radio for Army Airplanes
Whereas previously wire had been pre-
ferred, in particular because its use was fa- The development of airborne radio and
of all other airborne electronic equipment
miliar to the unskilled soldier and because
was, of course, the concern of the Signal
its inherent security was high, now the new
Corps installations, especially the Aircraft
FM radio types, which became as simple to
Radio Laboratory, which served the Air
52
John J. Kelleher, "Radio-Relay and the War," Forces at Wright Field in Ohio. To the
Signals, I: 5 (May-June 1947), 37. Signal Corps Aircraft Signal Service fell
53
SigC R&D Hist, VIII, Pt. 3, proj. 824-A, p. 9.
55
In accordance with Army-Navy nomenclature, the Maj William Marks, Jr., Uapt Uiiver u.
T stood for ground transportable, the R for radio, Perkins, W. R. Clark, "Radio Relay Communica-
the C for communications, both transmitting and tion Systems in the United States Army," Proceed-
receiving. ings of the I. R. E. (Institute of Radio Engineers),
54
See below, pp. 371-73. XXXIII (August, 1945), 502-03.
238 THE SIGNAL CORPS
the whole business of developing, procur- Signal Corps to procure 13,708 SCR-183's
ing, inspecting, storing, issuing, installing, and 717 SCR-283's, over and above an
and maintaining those Signal Corps items existing requirement which totaled 38,342
of radio, radar, communicational and nav- for both sets. By the end of May the Signal
igational electronic equipment which went Corps had issued letters of intent to pur-
into airplanes. SCASS, which had been or- chase these additional thousands from
ganized at Wright Field in May 1942,56 Western Electric and Philco. Both com-
proved effective. Until the Army Air Forces panies at once multiplied their efforts and
took over altogether toward the end of their facilities, getting materials and parts
World War II, SCASS performed its task and increasing their tools. Philco's addi-
rather well, which was to co-ordinate the tional tooling-up alone ran to $150,000.
supply and maintenance functions of the If the AAF knew that high-frequency
Signal Corps with the materiel commands command sets were doomed, it gave no
of the Army Air Forces.57 The success of thought, apparently, to tapering off its or-
SCASS led General Olmstead to reorgan- ders so as to let down the Signal Corps and
ize his Monmouth activities similarly. Com- industry easily. These orders the airmen
bining the General Development Labora- guillotined in June with dramatic, and dis-
tories with the Radar, or Camp Evans, Lab- astrous, suddenness. The Signal Corps got
oratory, he created in December 1942 the the news informally at first, through a ru-
Signal Corps Ground Signal Service mor picked up by the Scheduling Branch;
(SCGSS) with headquarters at Bradley then, in response to a formal inquiry, it
Beach, New Jersey.58 learned officially on 27 June that the AAF
The most basic of the very many air- now had no requirements for the 183 and
borne radio devices which concerned the 283, of which it had wanted better than
SCASS was the command radio set, a me- 50,000 only a few weeks before. More was
dium-range radiotelephone indispensable to yet to come. After the Signal Corps had
fighter planes. The United States aircraft canceled the orders and, along with the
command sets which received most use dur- manufacturers, had written off the loss, the
ing the early months of the war were older AAF again reversed its position and de-
high-frequency types, even the "ancient" cided in July that it did want some SCR-
SCR-183 and SCR-283, good sets in their 283's, in fact 3,230 of them. Later the AAF
day but now out of date. Many thousands decided it wanted still more of these sets
were in use and on order. As late as 24 and on 20 November 1942 ordered 5,000
April 1942 the Air Forces had asked the additional 283's, together with 3,000 SCR-
56
(1) History of the Aircraft Radio Laboratory, 183's.
1 Oct 43, pp. 12-15. SigC Hist Sec File. (2) Ltr, On Signal Corps' reckoning, the AAF's
CSigO to CG AAF, 20 Apr 42, sub: SigC reorgn. failure to know its needs and to state them
SigC 413.44 Radio Instl 3 (RB-1537). (3) CSigO,
Annual Report 1943, pp. 41-43. (4) See also, promptly led, in the case of these two ra-
above, p. 181.
57
dios, to (1) the wastage of $75,000 in criti-
Rpt of Radar Div OCSigO, 1942 (unsigned),
p. 3. SigC 319.1 Rpts Gen 1, May 38-Aug 42
cal materials such as aluminum abandoned
(RB-781). in a partly fabricated condition; (2) the
58
Historical Report of the Signal Corps Engi- loss of $150,000 in tools that had become
neering Laboratories (Ft. Monmouth, 1944), pp.
6, 28. SigC Hist Sec File. useless; and (3) the irreparable loss of man
SIGNAL EQUIPMENT: WIRE AND RADIO 239
hours spent in fabricating the now useless to copy the equivalent British equipment,
tools and half-finished parts. Moreover, the British VHF command set which the
while the production lines of two of Signal AAF had been demanding since February
Corps' principal suppliers stood disrupted, 1941. For BOLERO it now seemed manda-
the United States Government would have tory, to be installed in both fighters and
large bills to pay covering cancellation costs bombers flying into England, where com-
and tool costs: $100,000 to Western Elec- mand radio operation, both plane-to-plane
tric and $150,000 to Philco.59 and air-to-ground, was universally VHF.
Everyone in the Army Air Forces cer- Production of it as the SCR-522 com-
tainly should have known that the high-fre- menced at Bendix in March 1942.62
quency command radio was doomed. Air Hardly had the first SCR-522's flowed
Forces officers themselves, following the from Bendix into the field than complaints
example of the British, had condemned it. came foaming back, a veritable flood of
They had directed in mid-1941 that all them, beginning in May 1942. Shocking per-
fighters be equipped with very high fre- centages of the first SCR -522installations
quency radio, copied from the British. were defective, practically immobilizing
Unfortunately, the newest and best con- otherwise perfect aircraft. Very much to-do
temporaryAmericancommandset,SCR- 274,
justbeginningtosupersedethe183and ensued throughout the summer, with re-
criminations and unpleasantness all along
283, was only a high-frequency set. The Air the line—from the airmen, from the Signal
Forces hoped to convert it to VHF operation Corps, from the radio and aircraft builders,
and in June 1941 had asked that the Air- even from the British. Trouble shooters went
craft Radio Laboratory develop a VHF forth from the Inspection Section of the
60
component for it. The laboratory's engi- Aircraft Radio Laboratory and from Ben-
neers were drawing up the specifications by dix. Bendix blamed the inexperience of the
mid -1942. They were laboringcivilian also upon
and military personnel at the air
other VHF airborne equipment, continuing bases. The military were inclined to blame
their long research upon the American very Bendix. Since SCR -522 was a copy of a
high frequency SCR -264, and at theoriginal,
British same poor design was attributed
time designing suitable test sets and devel- to the parent set. The chief troubles were
oping other new equipment, compasses, failure of the dynamotor, PE-94, which
radio ranges, beacons, and so on, which powered the set, and defectiveness of the
would operate in the hundreds of mega-
cycles.61 The principal task, however, was some, was the command set antenna, built into a
short antenna stub which projected vertically from
69
Incl, Tab B, Item 5, SCR -183;SCR-283, the aircraft fuselage. Buffeted by the air flow, sub-
with 1st Ind, Somervell to CG AAF, 24 Nov 42, jected to extreme vibration and strain, the stubs
on Ltr, Arnold to CG SOS, 10 Nov 42, sub: De- frequently snapped off, until the ARL developed a
layed proc of critical radio and related equip re- maple plywood type, impregnated with phenolic
quired by AAF. (SigC (EO) 475 SigC Equip Gen, resin under extremely high pressure. CSigO, Annual
1942-44. Report,
62
1943, p. 137.
60
Ltr, Chief of AC to CSigO, 7 Jun 41, sub: (1) Ltr, TAG to CSigO, 25 Feb 41, sub: Equip
VHF SCR-274 comd set. AAG 676.3-A Wireless for Air Defense. AG 413.68 (1-27-41) M-D. SigC
Radio Systems. CE Drawer 526, AWS, 1941. (2) AAF R&R, Col
61
ARL Prog Rpts, Jul 42, proj. 41, p. 20; proj. Marriner to AFRDB, 15 Jun 42, sub: Radio sets in
47, p. 21; proj. 51, p. 22; and proj. 67, p. 28. A bombardment planes for BOLERO. AAG 413.4-M
minor matter of VHF development, but trouble- Com Equip. (3) See also pp. 79-81, above.
240 THE SIGNAL CORPS
amplifier tubes 832 (VT-118). Moreover, methods were bad, and no wonder. There
many installations were made very badly; was no suitable test equipment—quite a
tuning adjustments were way off. Everyone chronic defect touching new electronic de-
agreed to tighten up on inspection, and to vices. This was especially true of radar dur-
improve the training of the workers. Produc- ing 1942 when basic equipment was being
tion manager E. F. Kolar, after inspecting rushed to the field before test and tool sets
SCR -522 troubles at the Bell Aircraft plant or even designed. The Air-
were available
in June, had urged Bendix to institute addi- craft Radio Laboratory was busy develop-
tional precautions at the factory "to insure ing test sets, but not until 9 September 1942
the highest quality workmanship," and to did the first SCR -522 test set, IE-
send a representative to each aircraft factory reach the radio installation people at Cur-
in order to train personnel there in the nice- tiss.65
ties of installation and tuning.63 When Webb and Inness inspected the
Improvements came slowly. In Septem- Curtiss Aeroplane plant on 7 September,
ber W. L. Webb, Chief Engineer of Bendix they were told by the AAF representative
Radio Corporation, and Maj. W. D. Inness, there, Colonel Mitchell, that lack of experi-
inspecting matters at the Curtiss Aeroplane ence with the VHF SCR -522 was
Corporation at the Buffalo airport, were the chief source of trouble, augmented by
shocked to behold the careless handling of lack of test equipment and by one very real
the SCR-522's as they came in. They were mechanical defect involving the dynamotor.
strewn around a disorderly radio shop He mentioned, too, that an average of three
where two girls poked over their wiring and antenna mast stubs broke on every eight to
adjustments to see if anything was loose. ten flights. The American copy of the Brit-
The girls "weren't real sure what they were ish dynamotor simply had not worked out
looking for." Obviously, they might damage well. As General Olmstead informed the
a set by tightening a tuning adjustment Air Forces some months later, the dyna-
which they might suppose loose.64 Test motor design was unsuited to American
manufacture, which employed American
63
(1) Rpt, W. L. Webb, Chief Engr of Bendix materials and methods. Bendix had ob-
Radio Corp, SCR -522 Field Troubles, jected
2 June to
42;copying it in the first place, but at
(2) Ltr, John J. Finocharo, Principal Adm Proc that time, in 1941, all had agreed that the
Inspector, to Capt Koerner, Chief of Inspec Unit
ARL, 5 Jun 42, sub: Rpt of trip to Grenier Fld, only way to meet desired production sched-
Manchester, N. H.; (3) Ltr, J. D. Woodward (Ben- ules was to copy it anyway, while develop-
dix employee) to W. L. Webb, 6 Jun 42; (4) E. F.
Kolar, Rpt of SCR -522 Trouble at Belling Aircraft,
a new design. Aircraft Radio Labora-
6 Jun 42, and other papers. SigC 413.44 (SCR tory -522)
engineers were now working out the
4, Mar-Jun 42. Woodward claimed that "by far new dynamotor. By December they would
the greatest source of difficulty was due to a com-
plete lack of working knowledge of the equipment complete it; tooling for production would
on the part of the military personnel at the Air begin, and in 1943 the AAF would receive
Base."
64
W. L. Webb, Report of Trip to Curtiss Air- improved, trouble-free dynamotors for its
craft, Buffalo, 7 Sep 42. SigC 413.44 (SCR -522)
65
6, Sep-Oct 42. Webb described the radio shop at R. L. Daniel, Report of Trip to Curtiss Aero-
Curtiss as in about the same condition as that of plane Corporation, Buffalo Airport, 3-11 Septem-
Bell Aircraft two months earlier, namely, "very ber 1942, 18 Sep 42. SigC 413.44 (SCR -52
badly organized and in a bad state of confusion." Sep-Oct 42.
SIGNAL EQUIPMENT: WIRE AND RADIO 241
VHF command radio SCR -522.66 Until reasons all stemmed from its novelty. Apart
then, throughout 1942 and early 1943, the from a few experimenters and researchers,
Eighth Air Force in England obtained the Americans were so generally inexperi-
muchofitsVHFradioequipment,dyna-motorsespecialy,fromtheBritish.Until enced in the very high frequencies that they
lacked even the essential test equipment
improvements were accomplished in the which could function accurately at frequen-
American equipment, radio communica- ciesabove100megacycles.ButallthesedeficienciestheSignalCorpswasfastmending
tions in Army Air Forces P-47's had some-
67
times been impossible. in 1942, bringing air radio up to date,
Thus, Signal Corps' introduction of VHF whether between aircraft, or between air-
into army airplanes brought a great deal of craft above and the AACS stations below,
fuss and trouble, just as the advent of radar joining them all in one dependable net of
was doing. VHF brought headaches to the radio communications.
Aircraft Radio Laboratory, to the manufac- Such are the principal threads of the his-
turers both of the electronic equipment and tory of the problems and accomplishments
of the aircraft themselves, and to the Army touching Signal Corps wire and radio equip-
Air Forces personnel who operated it. The ment during the months immediately prior
to TORCH, the Allied invasion of North
66
Ltr, CSigO to Dir of Com AAF Hq, 4 Dec Africa. During the same period the Signal
42, sub: Maint of PE-94 power units for SCR -522.
SigC413.44 (SCR -522)7,Nov-Apr43. Corps concerned itself intensely with prob-
67
Wesley Frank Craven and James Lea Cate, eds., lems associated with radar, the military im-
The Army Air Forces in World War II, II, Europe: portance of which was as incalculable as
TORCH to POINTBLANK, August 1942 to De-
cember 1943 (Chicago: The University of Chicago
that of the more conventional types of elec-
Press, 1949), 335, 610. tronic devices.
CHAPTER IX
During 1942 airborne radars multiplied, Marriner in the Air Forces Communica-
and multiplied again, as newer and better tions Directorate had assured the British on
sets emerged from the laboratories, tending 8 May that "the American SCR -535
always toward shorter wavelengths. The be installed in all aircraft assigned to BOLERO
seemingly endless variety of their types and in lieu of the British Mark II (R. 3003)." 2
applications, the overwhelming quantities The SCR—535 could pick up radar beams
in which the Air Forces demanded them, on the SCR-270's frequency band and also
amazed and sometimes stupefied the initiate on the bands of both the SCR-268 and
hardly less than the occasional outsiders whothe numerous British radar types. It threw
were favored with glimpses of these highly back an intense echo, which would flash
secret developments.1 prominently on the oscilloscopes of ground
search radars and thereby serve to identify
IFF—Identification: Friend or Foe Radar the aircraft as friendly. Despite production
troubles and shortages, Philco produced
One of the airborne radar types to which thousands of SCR-535's during the year.
BOLERO,, the American build-up in Eng- By 30 July 1942 the Air Forces had on
land, gave an immediate and mighty boost order 18,000 of these radars.3 Although IFF
in 1942 was IFF. American aircraft flying 2
over Britain had to be identified in the os- Ltr, Marriner to Group Capt G. H. Randle,
RAF Delegation, British Air Commission, Wash-
cilloscopes of the ground radars which kept ington, 8 May 42. AAG 413.4-J Com Equip.
3
vigil over all the approaches. The agreed -upon
Ltr, CG AAF to CSigO, 30 IFF forsub:
Jul 42, BOLERO
Addi-was the Br
tional proc of SCR-535A and SCR-535AZ IFF
sets. SigC 413.44 SCR-729-RC-170 No. 1, Apr
II, which, pending the development of the 42-Jan 43 (RB-1815). Five days after Pearl Har-
more advanced IFF Mark III, the Signal bor Philco had received a Signal Corps letter of
Corps copied as the SCR -53intent
5. to
Philco
purchase 5,000 sets. With utmost effort
Colonel
delivered 26 handmade samples to the Air-
craft Radio Laboratory on 1 January 1942. By 14
1
See the listing of airborne radars under both January flight tests had okayed their models. Be-
"Military Operations" and "Navigation" in Ter- fore the end of January, bolstered with an order
rett, The Emergency, Appendix: Signal Corps for 15,000, Philco had already gotten more than
Equipment, World War II. 100 sets accepted by the Signal Corps inspector,
SIGNAL EQUIPMENT: RADAR 243
Mark II and SCR -535 werecan stopgap sets,moved outward to carry the
aircraft
serving in place of the more universally offensive to the enemy was the radio altim-
usable IFF Mark III, which the Allies had eter, actually a radar whose downward
agreed to adopt ultimately, the 535's met rays and upward reflections could give ex-
all immediate requirements and their pro- act clearance above the ground or water
duction kept up with the new aircraft, so below. The year 1942 saw rapid develop-
that by the year's end the Signal Corps ments touching the American pulse altim-
could assert that no airplanes had been de- eter SCR -518.6
4
livered to combat areas without them. Yet The Signal Corps had ordered 11,579
by then the SCR -535 was yielding of thesetoheavy
the 100-pound altimeters which
Mark III SCR -595 and 695. wereAseffective
early as to at least 20,000 feet. It had
October, after purchasing some 38,000 ordered them well before Pearl Harbor on a
SCR -535 components and after letter getting
contract with RCA dated 3 Septem-
18,000 SCR-595's through the Navy, the ber 1941. Meanwhile, Signal Corps engi-
Signal Corps had also procured 62,000 neers in the Aircraft Radio Laboratory de-
SCR-695's.5 The British Mark III would veloped efficient to 40,000 version,
a n improved feet and t weighing
heSCR
become the universal Allied IFF of World
War II, replacing both Mark II and the only about 60 pounds. On the Air Forces'
so-called Mark IV, the last being IFF of request, the Signal Corps now reduced the
American design—the American radio rec- SCR -518 order to 6,114 and in Feb
ognition sets SCR's-515, 532, and 533, issued a letter of intent to RCA and a sub-
which were held in readiness in case Mark contractor, Stewart-Warner, for 15,000
III sets became compromised through SCR-618's. In mid-1942 the AAF placed
capture.
its entire 1943 altimeter requirements at
24,527 SCR-618's and only 7,989 SCR-
Signal Corps Altimeters; 518V
Secretary Patterson's Objections By this time research successes again fur-
High-level bombing had always held a ther complicated procurement problems by
top place in Air Forces thinking. Therefore developing a still better and lighter weight
set, the SCR-718, which weighed only some
another airborne radar application that be-
gan to assume great importance as Ameri- 30 pounds. The fighting men must have the
best, and once more the AAF altered its
had nearly completed the conversion of their San- altimeter orders. It now asked for several
dusky, Ohio, plant to large-scale production and thousand 718's and cut its SCR -518
were justifiably proud of their "all-out effort." Ltr,
Balderson, vice president Philco Corp., to Col Rives, to 2,000 sets. This the AAF did on 20 Sep-
28 Jan 42. SigC 413.44 SCR-535-A, Jul 41-Jul tember. Three weeks later, on 14 October,
42, No. 1 (RB-1517). See also Terrett, The Emer- it asked the Signal Corps to stop produc-
gency, p. 266.
4
Memo, CSigO for J. J. Pilliod, Expert Con-
6
sultant, SigC Sec Prod Sv Br SOS, 15 Dec 42. See above, pp. 84-85.
7
SigC 413.44 SCR -535 No. 1, 1942-44 . Production of the 518 was just beginning. By
5
Ltr, Lt Col John W. Sessums, Jr., ACofS, to 16 July the Signal Corps delivered the first 195
Dir of Com AAF, 31 Oct 42, sub: Replacement of sets to the AAF. Memo for Radar Div (unsigned),
IFF SCR -535 with SCR 16
-5 Jul942,
5sub:
andWeekly
SCRprog rpt of Radar Br. AAG
-695. SigC
413.4-S Com Equip. 319.1 Rpts Gen 1, May-Aug 42 (RB-781).
244 THE SIGNAL CORPS
tion altogether on the 15,000 SCR-618's 70,000 man hours spent in fabricating the
which had been ordered in February.8 wasted material. He estimated, too, that it
Thereupon, procurement people in the would cost $472,500 to change the factories
Signal Corps and in the Office of the Under over to other types of manufacture. On top
Secretary of War protested that established of all this he piled "cancellation cost and tool
programs, factory dispositions, and money costs to the United States in excess of
spent on tooling and materials were lost or $1,600,000, with nothing to show for it."
9
ments are likely to cause appreciable Thus, still another radar joined the large
10
trouble." numbers of electronic gadgets crowding the
For exact determination of altitude at Army's airplanes. Airborne radar and radio
low levels, the pulsed high-level altimeter, were multiplying almost by the day, to the
such as the SCR -518 and SCR pleasure of some,-71to 8, dismay
the would of others.
not do. At levels measured in the tens and Electronic diversification into myriads of
hundreds of feet of altitude, a pilot had to new military applications merely paralleled
have another kind of radar altimeter, the in the air what was happening on the
continuous-wave, frequency-modulated ground—the whole constituting a tide
(FM) type. In this radar variety, the Air which rose as inexorably against the com-
Forces had previously taken slight interest. mand of military lords in World War II as
But now in mid-1942, submarine warfare the ocean had once defied King Canute.
all of a sudden menaced American shores, A year earlier, shortly before Pearl Har-
and the airmen found themselves called bor, the Chief of Staff, General Marshall,
upon to help combat the new peril. They had given Olmstead an inexecutable
needed the low-level altimeter for pressing order—to simplify and reduce Army's radio
close-in attacks upon subs. "Our operational types.12 Obediently, Olmstead had sought
people have indicated," Col. Robert G. to comply, but his efforts were in vain.
Breene, director of the AAF Technical Serv- Now, in September 1942, Robert P. Pat-
ices, informed the Joint New Weapons Com- terson, Under Secretary of War, repeated
mittee on 29 June, "that an accurate Marshall's wish, with respect to airborne
absolute altimeter of this type is almost as equipment especially. He directed his com-
important as the ASV equipment." Navy ments not to Olmstead directly, as Mar-
men had had such an altimeter developed shall had done, but to the Chief Signal Of-
and in production, their AYB, extremely ac- ficer's new superior, General Somervell,
curate from zero to several hundred feet and
who of course merely passed them down to
especially useful to them as a landing aid for
the Signal Corps for reply. Specifically,
carrier-borne aircraft. By mid-July Colonel
Marriner had asked General Olmstead for Patterson wrote that he constantly ques-
1,000 sets to meet the new needs. On 21 tioned "the need for so much and so many
September the device received approval for types of radio, especially for airplanes." He
standardization from the Signal Corps expressed the hope that David Sarnoff,
Technical Committee and became the president of the Radio Corporation of
RC-24, subsequently the AN/APN-1.11 America, who had recently joined the War
Department for a 30-day tour of duty as a
10
OCSigO R&W Action 1, Col Burns, Exec Radar
Br, to Col Eugene V. Elder, Proc Div, 17 Apr 42, Committee, 29 Jun 42, sub: Antisubmarine weap-
sub: Airborne Radar Equip, ASV Mark II and ons, p. 5. AAG 413.4 Radar Gen. (3) Ltr, Mar-
ASV-10 curtailment of purchases. SigC 413.44 riner to CSigO, 14 Jun 42, sub: Proc of altimeters
Radar Equip 1 (RB-1396). For other examples of type RC-24. AAG 413.4-M Com Equip. (4)
waste incurred as Air Forces plans changed, see OCSigO Engr and Tech Div, History of Signal
Terrett, The Emergency, Ch. X. See also, above, Corps Research and Development in World War II,
pp. 238-39. II, Pt. 1, projs. 201-A and B, p. 5. Following the
11
(1) Interv, SigC Hist Sec with Maj E. A. Army-Navy nomenclature system, the A stood for
Massa, O/C Detection Br, Electronics Div ARL, 9 airborne, the P for radar, the N for navigational aid.
12
Oct 44. (2) Memo, Breene for Joint New Weapons See Terrett, The Emergency, pp. 294ff.
246 THE SIGNAL CORPS
Signal Corps colonel, might help to review terson a false impression. A reduction in the
air electronic military requirements, in the number of radio compass types, for exam-
interests both of decreasing airborne weight ple, would not reduce the total quantity
and of easing the shortages which plagued needed and would not therefore alleviate the
factory production. Acquiescing in the de- load on industrial production, which was
mand, General Olmstead's deputy, Gene-
Patterson's chief concern. Moreover, Maj.
ral Code, suggested possible simplifications.
Gen. Carl Spaatz and other air command-
Code listed the twelve items which the Sig-
ers in the field wanted more and more
nal Corps was currently installing in bomb-
ers, the eight items that went into transport equipment, of all types. "Send everything,"
planes, and so on, down to the single in- was the tenor of their reports, "we will de-
terphone set installed in primary trainers. cide what to leave out"—a demand which,
He then proposed various reductions, es- McClelland dryly observed, offered no relief
pecially in the nine types of radio com- to production problems. He agreed with
passes, which he thought might be simpli- Spaatz that the Air Forces had to have more
fied into two. As for altimeters, he sug- radio and radar, and he passed on to Gen-
gested eliminating the high altitude 518 SCR eral Arnold
- hisfrom
beliefairplanes
that thoseequipped
responsiblewith ASV
for producing this equipment had "held
radar and using the low level RC-24 only. their sights too low." The Air Forces, he
On the whole, Code felt that the "situation believed, far from following the Signal
is well in hand," for already the number of Corps' effort to comply with Patterson's
aircraft radio types had been reduced from wishes, should demand greater production.
forty-one to sixteen. Presumably he was McClelland was emphatic:
thinking only of radio communication and Insist that the SOS (Chief Signal Officer)
navigation sets, not of radars, which were take steps (similar to those taken by you when
now irresistibly on the increase.
13 you saw the need for more aircraft plants) ;
which will result in the provision of produc-
The AAF responded at once, and ve- tion facilities to meet the increasing demand
hemently. It rejected any notion that air- for radio equipment. It is apparent to me
borne electronic devices be simplified or that those responsible for procurement of
radio have held their sights too low and have
reduced. It wanted more, not fewer, of not anticipated demand. The development
them. Brig. Gen. Harold M. McClelland, of radar is finding increasing application to
in Air Forces Headquarters, after reading a airborne use. Such use is very materially en-
copy of Signal Corps' proposed simplifica- hancing the potency of the airplane e. g., sea
search, blind bombing, air gun laying, etc.
tions, wrote emphatically to the Chief of We are certainly not going to go without these
the Air Forces. General Code, McClelland important devices and we can expect no com-
commented, was giving Somervell and Pat- pensating reduction in the normal communi-
cation sets. Therefore, we should face the fact
13
Hq AAF R&R, Col Benjamin W. Chidlaw,
that we need increased production facilities,
ACofS AC, to AFTSC, 15 Oct 42, sub: Aircraft make the best estimate we can, and start get-
radio equip with Incl 1, Ltr, Code to CG AAF, 9 ting new plants built.14
Oct 42, and Incl 2, Memo, Code for CG SOS, 9
14
Oct 42, also Incl 3, Memo, Patterson for CG SOS [AAF R&R] McClelland to Arnold, 17 Oct 42,
and CG AAF, 24 Sep 42, sub: Radio equip pro- sub: Aircraft radio rqmts. AAG 413.4-R Com
gram. AAG 413.4-R Com Equip. Equip.
SIGNAL EQUIPMENT: RADAR 247
AI—Airborne Interception Radar No sooner did the airmen begin to re-
ceive this highly complicated airborne
Not until the late spring of 1942 had equipment than dire difficulties respecting
Signal Corps' copies of the puny British AI maintenance arose, difficulties touching all
IV (long wave) begun at long last to come airborne radar alike, IFF and ASV as well
off Western Electric's production lines as as AI. Two Signal Corps lieutenants who
SCR -540. Only 580 sets hadhad beenserved
ordered;
in England as members of the
no more were wanted, so the AAF had as- Electronic Training Group and who were
serted in May.15 Late in June the AAF is- now contributing their experience to the
sued a priority schedule for delivery of the ARL recommended to Colonel Bayer, the
first SCR-540's: to Navy, 3 sets; to the chief of the Radar Division at the labora-
ARL, 1 set; to the Douglas Aircraft Com- tory, that each Air Corps squadron be as-
pany, 1 set; to the Hawaiian Department, signed maintenance men who could make
3 sets; to the Signal Corps School, 6 sets; minor repairs on the spot. In their opinion,
to the AAF Technical School No. 2, 6 sets; each squadron should adopt the British
to the Western Electric Training School, practice and set up a maintenance section
Kearny, New Jersey, 5 sets; then 6 more of a score or so men equipped with the
sets to the AAF Technical School No. 2. "megger" (which was a special device to
Finally, after all the above had been de- test insulation), together with test set I — 4
livered, 59 sets would go to the Douglas the multirange volt-ohmmeter TS-189,
16
Aircraft Company. and suitable signal generators and oscillo-
Airmen installed their 540's in oversize scopes. Colonel Gardner, director of the
fighter planes such as P-70's, converted laboratory, agreed, excepting only the signal
from the twin-engined A-20 attack bomber. generators and oscilloscopes which he be-
By the end of August, 25 sets had been lieved should be18 reserved for maintenance
marked for Hawaii, consigned to the signal work at depots.
property officer at the air depot there. Ten sets SCR-540-A, both attached to OCSigO R&W
days later, Colonel Marriner asked the Sig- Action 1, Lt Wheeler, Radar Br. SPSRB-3, to Proc
nal Corps to allocate another 25 sets to and Liaison Br, 15 Sep 42, same sub; (3) Ltr,
Hawaii for spares. Simultaneously, he asked Capt R. Davison, Asst Chief of BuAir, to CSigO,
12 Sep 42, sub: Proc of airborne radar equip.
also for 7 spare sets to go to Panama. On 12 SigC 413.44 SCR -540 No. 2, Apr 42-Jan 43 (
September the Navy Bureau of Aeronautics 1706). The 7 spares to Panama were shipped
on 23 September; the 25 spares for Hawaii in mid-
asked for 12 sets for the Marine night fighter October. Ltr, CSigO to Dir of Com Hq AAF,
17
squadrons. 29 Oct 42, sub: Shipment of Radio Sets SCR-
15
540-A. In same file.
1st Ind, CG AAF to CSigO, 21 May 42, on By 5 October the Air Forces had allocated 60
Ltr, CSigO to Dir of Com Hq AAF, 18 May 42, airplanes equipped with SCR -540, thus: 24 to
sub: Proc of additional SCR -540 Equip.Fighter SigC
Command School, Orlando, Florida; 25
413.44 SCR -540 No. 2, Apr 42-Jan 43to(RB-1706).
the Hawaiian Department; 7 to the Caribbean
For the background of SCR -540 see above, Command;
Defense pp. 1 to the Air Technical School,
86-87. Boca Raton, Florida: 2 to Wright Field; and 1 to
16
Ltr, CG AAF to CSigO, 20 Jun 42, sub: Allo- the Air Corps Proving Ground, Eglin Field, Florida.
cation of radar sets SCR -540. SigC 413.44Ltr, CG SCR -5
AAF to CG 40
Fld Svs ASC, 5 Oct 42, sub:No. 2, Apr 42
17
Radar equip in P-70 airplanes. AAG 413.4-C Radar
(1) Ltr, CG AAF to CSigO, 31 Aug 42, sub: Equip 1942.
18
Shipment of radio sets SCR -540; (2) Ltrs, Ltr, CG
Gardner to CSigO, 2 Jul 42, sub: Maint
AAF to CSigO, 11 Sep 42, sub: Shipment of radio of SigC equip (radar) with Incl, Memo, 2d Lts
248 THE SIGNAL CORPS
Test and maintenance equipment con- Orlando air base, Florida, that though "the
stituted but one trial. Another, especially external appearance and general impression
severe in airborne radar, was training created on first examining the SCR-540A
equipment. Airborne radar required that equipment is one which augurs well for the
operators be well trained, or else the costly future . . . unfortunately it is not borne
equipment was useless. Yet to train men in out in practice." He attributed many break-
actual flight was out of the question. There
downs to inferior materials used in its con-
were not enough airplanes, and what radar
struction, especially in the cables inter-
existed was desperately needed for patrol
connecting the components of the radar. He
and combat operations. The answer lay in
sets which could simulate airborne opera- noted defects in the cathode ray tubes which
tion in a classroom. The British had devised were "seriously astigmatic," so that accu-
such radar trainers. The ARL, also, had rate focusing of target echoes was impos-
long before asked the Link Aviation De- sible. Some breakdowns he blamed upon
vices Company, manufacturers of the well- bad installation (as in the case of the VHF
known Link trainer for pilots, to develop command radio, SCR -522) and ot
a radar crew trainer, RC-110, to train men attributed to poor workmanship or even
in AI (SCR -540) operation.sheer carelessness
But beforeon the part of crews.20
production of the trainer had begun, the Fortunately, night fighter aircraft no
540 itself was becoming obsolete for air longer had to depend upon the long-wave
intercept, being replaced by the much SCR -540 to hunt down enemy p
larger microwave AI radar, the SCR-520, Since early in 1942 the Radiation Labora-
which called for a quite different trainer tory, where scientists worked on radar for
set. Because this new radar was already Division 14 of the National Defense Re-
well developed, Colonel Marriner was able search Committee, had been building num-
to cancel further work on the development bers of its prize AI-10. The Army's version
of the 540 trainer.19 of this big microwave American radar, the
By October 1942, therefore, America's SCR-520, was so superior to the older Brit-
first air intercept radar, the SCR ish long wave
-540, was AI IV that the British them-
obsolescent. Further, it suffered from many selves pressed eagerly to get quantities of
defects. Maj. James W. McRae, charged it in a special form suited to their planes, des-
21
with the Airborne Radar Section in the Ra- ignated SCR-520-UK. When factory pro-
dar Branch of the Office of the Chief Sig- 20
Maj. J. W. McRae, Report on SCR-540A
nal Officer, reported concerning SCR-540's Equipment and Installation in P-70 Aircraft Lo-
which had been installed in P-70's at the cated at Orlando Air Base, Florida, Covering the
Period from July 31, 1942, to October 1, 1942,
Jason E. Newman and Richard E. Langworthy for attached to OCSigO R&W Action 1, Maj Fell, Dir
Chief of Radar Div, 1 Jun 42, sub: Recommen- of Planning, to Dir of R&D Div, 20 Oct 42. SigC
dations for maint secs on ASV-equipped squad- 413.44 SCR -540 No. 2, Apr 42-Jan 43 (RB17
21
rons. SigC 413.44 SCR -540 No. 2, Apr 42-Jan Memo,43Gilbert L. Wehner, Asst Radio Engr,
(RB1706). OCSigO, for O/C Radar Div, 2 Feb 42, sub: Rpt
19
Ltr, CG AAF to CSigO, 22 Oct 42, sub: Can- on conf with British Air Commission ARL and
cellation of Link Aviation Devices crew trainer for Western Electric Co., Radio Set SCR-520-UK.
SCR -540. SigC 413.44 SCR SigC
-540 413.44 No.
SCR-520 No.42-
2, Apr 2, Jan-Dec 42 (RB-
Jan 43 (RB1706). 1705).
SIGNAL EQUIPMENT: RADAR 249
duction began in late spring, the Air Forces could not await factory production of the
set up priorities for the first deliveries: the SCR -517. The British received the
first two sets to the Northrup Aircraft Cor- tion Laboratory's prototype microwave
poration and thereafter one to Western ASV, DMS-1000—mounted in a B-24—
Electric (the manufacturer), one to the dubbed Dumbo I, followed by several more
Douglas Aircraft Company, thirteen to the crash-built sets, that is, hastily handmade by
Air Forces Technical School No. 2, six to the laboratory's own shop, the Research
the Signal Corps School, and four to the Construction Corporation. Dumbo I, and its
Signal Corps Maintenance School at dozen or so successors, called Dumbo II's,
Kearny, New Jersey.22 Most of these SCR- went to work in the hands of the English
520's were destined to be delivered, not as against subs in the Atlantic and in the Bay of
AI's, air intercept radars, but as air-to-sur- Biscay late in 1942, winning British acclaim
face-vessel sets. They would be converted as "the first substantial radar contribution
into SCR-517's, to serve in the capacity made directly to Britain's war effort by the
which the immediate needs of the war most United States."
24
had come to the Air Corps, 62 of which had ASV production during the summer of
been installed in B-18A bombers; the re- 1942 had probably been about as good as
mainder had gone to schools or had been the state of the radar art and the experi-
used as spares because—Marriner added the ence, or rather inexperience, of both the
universal complaint whenever new equip- manufacturers and the military users al-
ment came in—there were no spare parts. lowed. The demand was terrific, especially
The Air Corps had to cannibalize some of on the part of those who did not compre-
its new ASV's in order to provide spare hend all the difficulties. Meanwhile AAF
parts to keep other sets in operation.36 users, under the spur of Secretary Stimson
Thus all through the summer of 1942 and his adviser, Dr. Edward Bowles,
ASV production problems sputtered and worked out the tactics whereby Army
smoked. There was too much promising, bombers might best thwart the submarine
too little production. Air Forces officers pre- menace. The bombers would fly over the
pared a case history for the Services of Sup- sea to seek out submarines, not defensively
ply at the end of the year, checking off merely, accompanying convoys to protect
against the fair promises the dismal quan- them, as the Navy wished, but offensively,
tities actually delivered. The report sweeping the seas far and wide. Once a
commented: submarine was discovered, if not immedi-
. . . only properly evaluated production ately bombed to destruction it could be
schedules should be set up. Production sched- hounded. It would have to come to the sur-
ules were established which actual deliveries
of equipment have never paralleled. Through face eventually to recharge the storage bat-
failure to receive the equipment as scheduled, teries upon which it depended for under-
it has been impossible to vigorously prosecute water propulsion. If continually forced
that campaign of anti-submarine warfare
which is dictated by the sinkings of surface under, it would be rendered helpless.38 A
vessels along our sea frontiers and in other scant ten B-18's had been working out such
areas in which we are vitally interested. Fail- operational tactics under Col. William C.
ure to receive equipment on scheduled dates Dolan, using the first preproduction ASV-
results in loss of use of aircraft or ineffective
use. When installations are contemplated, it 10's, that is, SCR-517-A's converted from
is necessary to order airplanes to depots in the ten-centimeter AI radar SCR-520.
advance of icceipt of equipment. Failure to General Arnold had told Secretary Stimson
receive the equipment as scheduled requires
the aircraft to remain at the depots for un-
that Dolan's pilots flying four ASV-10's
necessarily long periods during which time the from Langley Field and two from Jackson-
Air Forces lose both the services of the crew ville, Florida, were "enthusiastic over the
and the plane.37 possibilities of this equipment." A month
36
(1) Ltr, Fred Lack to Col Mack, 26 Aug 42,
later Dr. Bowles urged the Secretary to set
sub: SCR-517-520 Radar Sets; (2) OCSigO
R&W Action 1, Maj McRae, Radar Br SPSRB-3, 413.44 Airborne Radar Equip 1, Jun 42-Mar 43
to Dir of Planning, 3 Oct 42, sub: Accumulative (RB-1908).
38
status rpt on ASV equip as of 3 Oct 42; (3) Ltr, Incl, Exhaustion System of Search for Sub-
Marriner to CSigO, 11 Sep 42, sub: Spare parts marines, Col DeArmond (bearing penciled note
groups for SCR-517-A. SigC 413.44 SCR-517-A "This is Dolan's suggestion"), 8 May 42, with
4, Aug-Nov 42 (RB-1513). AAF R&R, Col L. S. S., to AFACT, 15 Jul 42,
37
Ltr (originating in AFTSC) to CG SOS, 7 sub: Airplanes with ASV equip at microwave
Dec 42, sub: Critical shortage of radar equip. SigC school. AAG 413.4-M Com Equip.
SIGNAL EQUIPMENT: RADAR 255
up a "special bombardment group for Atlantic and Caribbean sea frontiers," an
submarine destruction." 39 AAF spokesman wrote on the first anni-
Bowles, backed by Dolan's ten B-18's and versary of Pearl Harbor, "has demon-
their repeated successes in sighting and at- strated that the most effective means of
tacking submarines, got action. By the curbing this type of enemy activity is
summer of 1942, the Army set up the Sea through the use of radar equipped patrol
Search Attack Development Unit (SADU), aircraft. Such activities have been ma-
soon renamed the First Sea Search At- terially reduced in those zones in which
tack Group, "at Langley Field to be an the Army Air Forces have been in a posi-
operational testing ground for new types tion to provide airplanes equipped with
of antisubmarine weapons. It is planned," sea-search radar sets for patrol work." 41
Capt. A. B. Martin wrote on 25 July, "that Although ASV radar would soon fall
it be of an experimental nature. However, from its high place in Air Forces and Signal
at the present time due to the concentration Corps interests, going over to the Navy, it
of ASV equipment and trained personnel nonetheless set off a long train of develop-
at Langley Field a certain amount of train- ments. In particular, it led to blind bomb-
ing of ASV-10 operators and mechanics is ing of land targets by air, BTO (bombing-
being carried on. In addition SADU is through-overcast) radar. Even the earlier,
called upon from time to time by the First long-wave ASV-II (SCR-521) had proved
Bomber Command to undertake tactical valuable for "seeing" the ground. So Gen-
antisubmarine missions." 40 eral Stoner, Acting Chief Signal Officer,
By the end of 1942 Secretary Stimson's informed General Arnold on 22 August
firm stand on behalf of ASV radar for pa- 1942, adding that he now had on hand
trol airplanes, and not just for seacraft, some 250 complete sets ready to ship wher-
seemed vindicated. "Experience in combat- ever the airmen might want them.42 In the
ting submarine activities along the North Aleutians the SCR -521 had proved
39
able not so much for vessel search as for
(1) Memo, Arnold for SW, 17 Apr 42, sub:
Rpt relative to ASVs. AAG 413.4-1 Com Equip. locating islands and coast lines, and so aid-
(2) Memo, Bowles for SW, 20 May 42, sub: Vitali- ing navigation amid cloud and fog. "All air-
zation of ASV submarine destruction program. AAG men in the Aleutians," commented one
413.4-K Com Equip. (3) Guerlac, Radar, p. 996
(Sec E, Ch. I, p. 14). AAF officer, "are enthusiastic about ASV
40
(1) Memo for File, Capt Martin, AC, 25 Jul radar, with which they can 'see' mountains
42, sub: SADU. AAG 413.4-N Com Equip. (2)
Guerlac, Radar, p. 430 (Sec C, Ch. II, p. 6). (3)
and prominences and thereby locate them-
Craven and Cate, The Army Air Forces, I, 550-51 ; selves. Their interest in ASV for search pur-
II, 401. poses," he added, "appears secondary." 43
Dolan's command expanded in October 1942,
becoming the Antisubmarine Army Air Command 41
under Brig, Gen. Westside T. Larson. It would Ltr cited n. 37.
42
cease to exist however, in mid-1943, as all Army Memo, Stoner for CG AAF, 22 Aug 42, sub:
participation in the sub war would begin to yield SCR -521 for ADC. SigC (EO) 413.44 Radio S
to the Navy, when the Tenth Fleet, Navy's anti- Gen 1942-44.
43
submarine command, at long last, came into being. (1) Memo, Maj Thomas S. Barnes, AC In-
Thereupon, Army's interest in ASV radar, and stallation and Maint Dept, for Chief of Radio Div,
therewith Signal Corps' interest too, would ter- 16 Oct 42, sub: Rpt on LRN siting trip, 18 Aug-
minate. Morison, The Battle of the Atlantic, pp. 12 Oct 42. AAG 413.4-R Com Equip. (2) Craven
242-45. and Cate, The Army Air Forces, I, 466.
256 THE SIGNAL CORPS
At about the same time General Olmstead more and more microwave developments in
asked that the National Defense Research airborne applications. Ten-centimeter
Committee set up a project at its Radia- equipment would yield to sets operating on
tion Laboratory in order to "determine the less than one-third as long a wavelength—
most desirable procedure for the use of on three centimeters or about one inch—
existing ASV equipment over land." The whereas the wavelength of Signal Corps'
radar maps which the Plan Position Indi- first radars was measured in feet. Numerous
cator, PPI-type oscilloscope, made possible, new microwave radar types were on their
"would obviously be useful," he wrote, way, such as ETO, bombing-through-over-
"guiding ASV equipped bombers to par- cast; LAB, low-altitude-bombsight; ARO,
ticular cities or targets." Three-centimeter airborne-range-only; AGL, airborne-gun-
gear, he suggested, would be even better laying. All these constituted luxuriant pro-
than the existing ten-centimeter radar.44 liferations of the flourishing radar growth
Thus the last months of the year 1942 which would confound the critics of elec-
found ASV microwave radar, far from be- tronic expansion in the air and bemuse
ing an end product, rather the beginning of even the advocates.
American ground radars for air de- tillery Corps, had had an interest since
fense—first, searchlight directors (SCR- 1937. This was a radar which could assist
268); next, long-range aircraft detectors the Coast Artillery Corps' mission of
(SCR-270 and 2 7 1 ) ; then, following Brit- coastal defense and which could detect ap-
ish experience, radars suitable for GCI proaching vessels, in the first instance giving
(SCR -516, 527, and 588)— all formed
advance but and in the second provid-
warning
one family of radars, all for use on the ing range and azimuth data to shore bat-
ground but all in some way involving air- teries. In 1937 the Coast Artillery Corps
45
craft. had asked for such a set. The Signal Corps
had typed it as SCR-296.46 But then, de-
SCR-296, Seacoast Artillery ferring to the greater need for air defense,
Fire Control Radar specifically for the need to develop long-
range detectors of aircraft, the Coast Artil-
There was another application for
lery Corps had permitted the Signal Corps
ground radar, unrelated to aircraft, in
46
which the Army, specifically the Coast Ar- This was the third Signal Corps radar type,
after the 268 and the 270. Coast Artillery had
44
Ltr, CSigO to WD Liaison Officer with NDRC, originally in mind thermal means of detection for
through CG SOS, 28 Aug 42, sub: Request for this purpose, until the 268 prototypes pointed to
initiation of project on use of airborne radar over the superiority of radio echoes. Capt Harry M.
land. SigC 413.44 Radar Equip 1, Oct 41-Sep Davis, Signal Corps Development of U.S. Army
42 (RB-1396). Radar Equipment, Pt. II, 1937-1941 (1945), SigC
45
For details about these long-wave ground radars historical monograph A-2, p. 32. SigC Hist Sec
early in 1942, see above, pp. 93ff. File.
SIGNAL EQUIPMENT: RADAR 257
to concentrate on the 270 and did not re- Production began slowly, the first set
open the matter of the 296 until late 1940. being delivered in April 1942, the second
Development got under way in 1941 in July. By then the Coast Artillery order
when the Signal Corps Laboratories ob- stood at 176 sets, to be delivered before
tained a 296 from Western Electric and mid-1943. This radar served for fire con-
added lobe-switching mechanism so that it trol functions through most of World War
could track a target. After putting it to II, although it had several defects, arising
service tests, the Coast Artillery approved
especially from the rather long wavelengths
it, had it standardized, and placed an order
for 20 sets. All this occurred before Pearl it employed at a frequency of about 700
Harbor. Immediately after that attack, al- megacycles. Before the end of 1942, the
though fear of air onslaughts transcended Signal Corps embarked upon the develop-
all other fears, there also arose apprehension ment of a better tracking set for coastal
for the safety of harbors and anchorages, defense, the SCR-598. This radar would
into which the enemy might send small for- lead, before the war's end, to a superb
ays of deadly torpedo boats or submarines. three-centimeter microwave Coastal Artil-
Therefore, on 18 December 1941, Admiral lery radar, the AN/MPG-1, operating at
Harold L. Stark had asked General Mar-
the extremely high frequency of 10,000
shall to consider the use of detector sys-
tems to stand guard at harbors and an- megacycles. These refined sets did not see
chorages. The chief of Coast Artillery, to service in the war. But another microwave
whom the inquiry was referred, replied radar did come to the aid of Coast Artillery
that while he did have searchlights which in 1942. This was the ten-centimeter SCR-
could illuminate a motor torpedo boat up 582, designed by the Radiation Laboratory
to 7,000 yards, he did not have radio de- in Cambridge, Massachusetts. It was one
tection equipment able to discern such sur- of the first ground applications of micro-
face craft. The SCR-268, which he was wave radar using the new PPI, or Plan
now receiving in quantities, was "not de- Position Indicator.48
signed to operate at zero elevation," he ex-
plained. But he did expect that the SCR- SCR—582, Harbor Surveillance Radar
296 would prove to be an effective detector
of small surface vessels. Delivery of the 296, The Coast Artillery men first saw the
he believed, would commence in the spring 582, or rather its laboratory prototype XT-
47
of 1942. 3, late in December 1941. A few days
47
(1) Incl, Ltr, Admiral Stark, CNO, to CofS, earlier a Signal Corps officer, Colonel Cor-
18 Dec 41, sub: Detector systems at harbor en- put, had ordered 50 sets from the Radiation
trances (Op-30Cl-FH) (SC) HL-16 Serial Laboratory's own shops, the Research Con-
0140030; (2) Incl, Ltr, Chief of CAC to ACofS
WPD, 28 Dec 41, same sub, Ltr, TAG to CSigO, struction Corporation. Between 27 and 30
13 Jan 42 (AG 660.2 [1-9-42] MSC-E). SigC
48
413.44 SCR-296-12G No. 2 (RB-1372). (3) Incl (1) Incl cited n. 4 7 ( 3 ) . (2) Orman, "Radar,
1, with 1st Ind, SCEL Hq to Chief of Tech Info, A Survey," pp. 4-7. (3) Col A. W. Clement,
OCSigO, 30 Jun 52, Ltr, CSigO to CG SCEL, 5 "Seacoast Artillery Radar," Coast Artillery Journal,
Feb 42, sub: Review of SigC hist material. SigC XCI, No. 3 (May-June, 1948), 8-12.
Hist Sec File. (4) Lt Col Leonard M. Orman, AN/MPG, under Army-Navy nomenclature, sig-
"Radar, A Survey," Coast Artillery Journal, nifies that the equipment is mobile (mounted in a
XXCIX: 2 (March-April, 1946), 3. vehicle), M; is radar, P; and is a gunlayer, G.
264-211 O - 78 - 18
258 THE SIGNAL CORPS
December Lt. Col. James E. McGraw, of the widest possible justifiable application of
50
the Coast Artillery Corps Board, had tested this set."
the XT-3 on Deer Island (Fort Dawes) in The 582 successes soon came to the ears
Boston Harbor. He favored it, rather con- of the Air Forces, whereupon in September
servatively, with the opinion that the General Arnold asked the Signal Corps to
test the new microwave ground detector
"SCR -582 is desirable equipment for use
against aircraft. Though the first sets could
by the Coast Artillery in harbor defense ob-
not scan the sky since no provisions had
servation stations." The eye of its con- been built into them for tilting the antenna
stantly rotating four-foot dish antenna dish upwards, nonetheless Coast Artillery
flashed upon the PPI a maplike view of men had noticed how well this radar was
the harbor area together with all the ves- able to track low-flying craft, 500 to a 1,000
sels therein. This it did with the detail feet above the sea, out to ranges of 40,000
which only microwaves make possible. yards.51
Whereas the SCR-296 could track but one Thus by the middle of 1942 the new
target at a time, meanwhile leaving the re- microwave radars, all radiating ten-centi-
mainder of the harbor unsurveyed, the 582 meter waves at about 3,000 megacycles, all
could watch over all targets within its range. American sets developed by the Radiation
As a surveillance set it valuably supple- Laboratory out of descendants from the
mented the fire control and tracking radar British cavity magnetron, were receiving
SCR-296.49 tremendous favor. Added to the success of
In May 1942 the first of the 50 SCR- the ground set SCR -582 were the
582's crash-built by the Research Construc- ments of the ASV-10, which, in the form
tion Corporation underwent preliminary of the airborne SCR—517, was actually help-
tests. The Coast Artillery men were deeply ing to sink submarines off American shores.
impressed. They expected the set "to be of Added to these was the scintillating promise
exceedingly great value." Further service of the gun layer SCR-584, or rather of its
tests in July at Fort Story, Virginia, led the laboratory prototype XT—1. Microwaves
Coast Artillery Board to urge increased pro- were coming in for all radar applications,
duction, beyond the 55 sets already on or- and long-wave radar was on the way out,
der, these being the 50 from the Research though the long-wave types would continue
Construction Corporation and 5 from the to do duty all through the war because they
Crosley Radio Corporation. The board rec- 50
(1) Ltr, Col Francis L. Christian, Exec CAC,
ommended that the 582 be restudied, in Hq Chesapeake Bay Sector, Ft. Monroe, Va., to
CG Eastern Defense Comd and First Army, 20
the light of its capabilities, "with a view to May 42, sub: Radio set SCR -582 (general
veillance detector). SigC 413.44 SCR -582 No
49 Dec 41-Jun 42 (RB-1385). (2) Ltr, Col W. S.
(1) Ltr, Dr. Bowles, Secy NDRC and mem-
Bowen, pres of CAC Bd, to Chief of Rqmts Sec
ber of Microwave Sec, to Col Rives, 2 Feb 42, sub: AGF, 24 Jul 42, sub: Proc of radio set SCR -58
SCR-582-T-1; (2) Ltr, CA Bd to Chief of CA, SigC 413.44 SCR -582 No. 2, Jul-Oct 42 (
4 Jan 42, sub: Preliminary rpt on sv test of radio 1522). (3) Baxter, Scientists Against Time, p. 147.
51
set SCR -582. SigC 413.44 SCR 5 -5
Ltr, CG8 2 8
AAF No. 1, Dec
to CSigO, 162 Sep 42, sub: SCR
, -
41-Jun 42 (RB-1385).
COAST ARTILLERY FIRE CONTROL RADARS. The SCR -582 (upper left) and
SCR-296 (upper right) at Charleston, S. C., and the SCR-296 and fire control towers at San
Juan, Puerto Rico (below).
260 THE SIGNAL CORPS
had been developed first and were now in terned after Navy's HPG, a radar intended
full production. for shipboard use both as a medium-range
The Army put the new microwave aircraft warning set and as a GCI.53 Repre-
ground radars to test in Panama. In mid - sentatives of the Signal Corps, the Air
1942 Dr. Bowles, radar specialist on Secre- Forces, the General Staff, and the Radiation
tary Stimson's staff, visited Panama, and Laboratory thereupon agreed that toward
was followed some weeks later by another the year's end the 708th Aircraft Warning
radar scientist and director of the Radia- Company in Panama would receive one
tion Laboratory, Dr. Lee A. DuBridge. SCR-615 and two SCR-582's, modified for
There the army commander, General An- vertical search. While the National Defense
drews, who was still faced with the possibil- Research Committee would supply the
ity of carrier-based air attack, asked that radars, together with the installation crews
the Panama Canal Zone become the testing and air-conditioned buildings, the Chief Sig-
ground for the newest and best in radar. The nal Officer would supply the power equip-
Radiation Laboratory scientists therefore
ment.54Subsequently,themodifiedSCR-
5 82,
mademobile,instaledinthree21/2-ton
kept in mind, as they developed microwave
applications, the problems of Panama de-
trucks, and modified with a tilting antenna
fense, especially the problems presented by
reflections from mountains. One of the dish for aircraft detection, became the
scientists, Dr. Ralph Bown, wrote to Du- SCR-682, a Coast Artillery long-range
Bridge on 6 August: "We thought that the early-warning radar employed in World
sharp beams characteristic of microwave War II against both surface vessels and air-
55
equipment, such as Dr. Bainbridge's HPG, craft.
might be one way of solving the problem."
Another way, which Colonel Corput sug- SCR-615, Microwave Radar for GCI,
gested to Dr. Bown, was continuous wave Ground-Controlled Interception
doppler radar, of the "fence" type.52
Microwave radar would be tried first and The SCR-615 was another Radiation
would indeed prove much better able to de- Laboratory ten-centimeter radar, whose
tect aircraft over high land masses than long- production, distribution, and maintenance
wave radar. Panama, then, was the ideal worries the Signal Corps now inherited.
place to try out the SCR The Radiation
-582 after it had Laboratory had begun de-
been modified with a tilting antenna for air- veloping this SCR early in the year at the
craft detection. Accordingly, in September behest of Colonel Saville, Director of Air
DuBridge recommended two 582's, so modi- 53
(1) Guerlac, Radar, pp. 611 ff (Sec C, Ch. VII,
fied, and one SCR-615, the latter being still 9 f f ) . (2) Memo on Proposal for Use of Microwave
another microwave detector which the Radiation Equip
Laboratoryin Panama,
hadDr. under
DuBridge, 24 Seppat-
design 42. SigC
413.44 SCR-615 No. 1, Jun 42-Jan 43 (RB-1813).
54
Memo for Red, Maj Fell, Directorate of Plan-
ning, 26 Sep 42, sub: SCR-615 and SCR -582
52
Ltr, Bown to DuBridge, 6 Aug 42, Incl with (Modified). SigC 413.44 SCR -582 No. 2 (RB-
AAF R&R, Col Saville, Dir of Air Defense, to 1522).
55
Comdt, Fighter Comd School, Orlando, Fla., 2 Oct (1) Guerlac, Radar, p. 615 (Sec C, Ch. VII,
42, sub: Dev of radar equip. AAG 413.4-C Radar p. 13). (2) Orman, "Radar, A Survey," Coast
Equip 1942. Artillery Journal, pp. 4-5.
SIGNAL EQUIPMENT: RADAR 261
Defense, who had frantically prodded the initial installation in Florida). Its range was
Signal Corps and the British for a GCI set. not inconsiderable, up to 90 miles, refuting
He had prodded all through 1941. Then Watson-Watt's insistence that only long-
early in 1942, realizing that the Canadian- wave radar could fetch distance. Moreover,
built CHL/GCI (the SCR -588) its would notat low levels, always a problem
coverage
be available for a while and that the527 (Signal Corps'
SCR with -long-wave radar, wascopy aofrevelation.
British GCI)
Even the set in Florida, which had been
would not come out of General Electric fac- poorly sited, tracked large numbers of flights
tories for quite some months, Saville turned below 5,000 feet, flights which other radars
to the National Defense Research Commit- in the area, all radiating long waves, failed
tee in a third effort to get some sort of GCI to detect at all. Similarly, in Panama, Lt.
soon. He had hoped that the Radiation Gen. George H. Brett, successor to Andrews,
Laboratory scientists might quickly modify got a surprise when he thought he would
for GCI use the Navy's HPG.56 show up the radar detection system, as so
The scientists made the modification, but often had been done before, by flying his
not so quickly as the impatient airmen plane in close to the water. On landing, he
wished—not until after the 588's became expected that his flight had been entirely
relatively abundant late in 1942 (but before "unseen" by the SCR radars in the zone.
the 527 appeared). And anyway, SCR-615 But he received a pleasant surprise when
was far better, for it was a step in the right
he was handed a plot of his flight, for which
direction, into microwaves and away from
the SCR-615 crewmen and their micro-
the long waves which both the 588 and the
wave helpmate provided the data, and
527 employed for long-range search. It was
found that his plane had been kept in
the first ten-centimeter GCI, a large fixed
"view" all the way to its landing.57
set having a six-foot antenna dish. Of the
first two models, crash-built by the Research
Construction Corporation, one underwent SCR -602, Lightweight Warning
service tests at the Army Air Forces School Thinking in terms of defense had set the
of Applied Tactics (AAFSAT), Orlando, tone of American radar efforts early in
Florida, toward the end of 1942; the other 1942. Fear for the west coast and for the
went to Taboga Island, at the Pacific en- Panama Canal had led the military to de-
trance of the Panama Canal, where it re- mand long-range detectors and GCI radars,
placed an SCR—271 which had failed to even the fixed long-wave gear of the early
work well there because of reflections from British CH and CHL/GCI sets. But as 1942
the rugged terrain round about. wore on, concern over passive air defense of
This first microwave GCI opened some the United States coast and possessions gave
eyes, especially among the proponents of way to thinking in terms of Allied offen-
long-wave radars, though it had some draw-
57
backs, too, and failed to win complete ap- Guerlac, Radar, pp. 637-39 (Sec C, Ch. VII,
pp. 34-36). Incidentally, it was the SCR's -5
proval at first (unfortunately true of the 615 in the Canal Zone which were first used exten-
sively to detect distant storm clouds and so opened
56
(1) Guerlac, Radar, pp. 635-36 (Sec C, Ch. up the possibility of weather forecasting by radar
VII, pp. 32A-33). (2) See above, pp. 96-97. aid. Ibid., pp. 612-13 (Sec C, Ch. VII, pp. 10-11).
262 THE SIGNAL CORPS
sives. A fresh reappraisal found long-range eral Olmstead asked for information about
detectors necessary at only a few places, this British "light mobile and portable air-
most notably, in Panama. In general the craft warning RDF set." Two months later
SCR-270 or 271 continued to prove good he had gotten nothing, whereupon he had
enough. Even Saville had acknowledged asked the Chief of Staff to make another
that the 270 was good in isolated uses, as petition. But even as he asked, the blue-
on an island, for aircraft detection. prints were at last on their way, followed
But Watson-Watt's belief that such long- late in June by one of the first British pro-
wave radars alone could attain great ranges totypes. On 25 June General Eisenhower in
was soon disproved by the new microwave London notified Washington that Lt. W.
ground sets. And the Air Forces' original W. Debenham, a Signal Corps officer who
stress upon mobility, which had led to the had been working with British radars, was
first American aircraft detector, the mobile that night leaving Prestwick, Scotland, the
SCR-270, received renewed emphasis in English terminus of the transatlantic air
1942 as military men planned to invade ferry. With him he had 1,000 pounds of
59
hostile shores. Contemplating attack upon lightweight warning radar. While the Sig-
distant beaches where air raids could sow nal Corps Radar Laboratory at Camp
vast harm among congested landing areas, Evans, Belmar, New Jersey, looked over this
the airmen gave thought to a set which LW, the AAF asked in mid-July for 100
might be taken onto a beachhead in pieces, service test sets and 100 spares. The AAF
carried by a few men who could assemble doubled the figures before the end of the
the radar in an hour or two. Its power and month, asking for 200 sets from American
range, of course, would be limited but
sources as well as for 200 sets from the Brit-
ish. These last the Signal Corps contracted
would suffice. The AAF, with its predilec-
for with the Canadian firm, Research Enter-
tion for British long-wave sets, turned to prises Limited, at $15,000 each, delivery to
them once again, to the British LW, or 60
begin in the following January. Thus the
lightweight warning radar which the Signal SCR -602 Type 1 became another B
Corps copied as the SCR -602,copy,
in timethe for
last copy of a British radar and the
use in North Africa.
Early in 1942 Saville had set forth the 59
(1) Ltrs, CSigO to ACofS G-2, 25 Feb and 15
airmen's requirement for an "equipment May 42, sub: 100 KW ASV transmitter (British) ;
(2) Ltr, U. S. Embassy, London, Special Observer
similar to the British light mobile or port- [Chancy] to CSigO, 14 Apr 42, sub: LW Set—
able early warning set." But this LW radar RDF; (3) WD Msg 2332 (CM-IN 8254), Eisen-
hower to AGWAR, 25 Jun 42. SigC 413.44 SCR -
prototype was not yet in production. Maj.
Gen. James E. Chancy had cabled from Lieutenant Debenham contributed much to the
design of this radar before his death, somewhat
England that the British would send two later, at Fort Monmouth. Incl 1 with 1st Ind,
sets to the United States as soon as they SCEL to Chief of Tech Info OCSigO, 30 Jun 52,
became available.58 In February 1942 Gen- cited n. 4 7 ( 3 ) .
60
Ltr, CG AAF to CSigO, 17 Jul 42, sub: Proc
58
of light portable radar, radio set SCR -602; (2) L
Memo, Norman Abbott, Assoc Radar Engr, for CSigO to CG AAF, 30 Jul 42, sub: Proc of radio
O/C Radar Div, 12 Feb 42, sub: Meeting to dis- set SCR -602, with 1st Ind, CG AAF to CS
cuss American GCI equip. SigC 413.44 British 5 Aug 42. SigC 413.44 SCR -602 No. 1, Feb-N
Ground Control GCI (RB-2330). 42 (RB-1526).
SIGNAL EQUIPMENT: RADAR 263
last copy of a long-range set (wavelength numbered no less than ten, ten varieties of
about one and a half meters, on 212 mega- SCR -602, either in production or u
cycles ) which the Signal Corps would have development by Research Enterprises, by
to produce for the AAF. the Navy, by the International Telephone
By mid-1942 the pressure for LW radar and Radio, by the Bell Laboratories, by
was becoming tremendous and, as so often Radio Corporation of America, by General
happens with new developments, the de- Electric, and by the Signal Corps Radar
mand built up suddenly with little advance Laboratory. The ten types varied in fre-
warning to the laboratory and procurement quency from the 212 megacycles of the
officers. At the outbreak of World War II long-wave British prototype to 1,000 mega-
the American Army had no really portable cycles. They varied in weight, too, from the
early warning radar. It had only the heavi- 1,200 pounds of Type 1, which was a copy
est kind of detectors. Even the mobile 268 of the British LW, to a 250-pound para-
and 270 could go only where heavy trucks chute set (SCR -602 Type 7) whic
61
could transport them. To ship them over eral Electric was developing.
water and to land them was no light mat- Thus, though last of the long-wave ra-
ter. Obviously their weight and bulk would dars, the SCR -602 was not least in
be handicaps in the island hopping, in the thing but size. Indeed, in its several forms,
diversified landing and other highly mo- it came to be one of the most important
bile operations which would figure so and numerous of aircraft detectors. Only
prominently in World War II. What the the first 25 off the production lines of Re-
Army needed was a detector which could search Enterprises Limited were exact copies
be packaged for hand-carrying by a small of the British LW prototype. They were
number of men, landed with the first waves designated SCR-602-T1. The next 250
of an assault, and assembled quickly for productions differed in design and in des-
operation whether in the early stages of an ignation, which was SCR-602-T6. There-
assault or in moving through jungles. LW after, still further modifications of this Ca-
radar was wanted now, wanted desperately, nadian-built British copy resulted in yet
and the pressure for it led to an amazing another change of designation, SCR—602—
variety. Contemplating invasions, the Gen- A. Of all these types of the SCR -602
eral Staff and the Air Forces wanted at was Type 8, the unique Signal Corps de-
62
once all the sets they could get (their plans velopment, that proved to be the best.
already called for upwards of 1,000 sets). This Signal Corps creation, SCR-602-
The Air Forces gave them priority over all T8, was destined to become the most effi-
other sets except IFF radar. They wanted cient set of its type, used late in World War
them lightweight, and still lighter, and they II as the AN/TPS-3 (the subsequent
wanted sets operating at different frequen- Army-Navy terminology: T for transport-
cies in order to minimize the likelihood of able, P for radar, S for search). For some
time prior to 1942 the Signal Corps Lab-
jamming, an art in which the enemy was
becoming proficient, especially in the megacycle
200bandwidth
61 -Ground ofRadar
the original British Clark & Co.
Rpt 1, Wallace
to Gen Colton, 14 Jan 43, SCR -602. SigC 413
SCR -602 No. 2, Dec 42-Mar 43 (RB-1709
LW. 62
SigC R&D Hist, cited n. 11(4), IV, Pt. 3, projs.
Before the end of the year the LW types 426-A, B, C and D.
264 THE SIGNAL CORPS
The remainder of ground radar and all who had been successfully jamming the
airborne radar in World War II is essen- SCR-268's there— it was the indispensable
tially, as far as the initial stages of research aid to Allied antiaircraft gun batteries. The
and development are concerned, a story of 584, in co-operation with the proximity
other institutions such as industrial labora- fuze, which was actually a tiny radar built
tories and especially the Radiation Labora- into a projectile, was to nip the buzz bomb
tory, under Division 14 of the National menace and find new applications—detect-
Defense Research Committee, within the ing land targets, tanks, and vehicular con-
Office of Scientific Research and Develop- voys at night.64 More 584's were to be built
ment. The Signal Corps kept in touch with in World War II than any other American
the work and took over the final details of radar, except the first, the patriarchal
development, inheriting of course all the SCR-268.
multitudinous adjustments necessary to Subsequent to first tests of the SCR-584
meet military requirements and to fit the at the Signal Corps Laboratories in Decem-
laboratory design for mass production. So ber 1941, the XT-1, the experimental
it was, as already shown, with SCR—582 prototype of the 584, was returned to the
and 615. They were the Radiation Labora- Radiation Laboratory. There the scientists
tory's offspring, although the Signal Corps refitted it with a larger six-foot antenna dish
65
made many tests and improvements upon and stepped up its range. Next, the set
them thereafter to suit military needs and went to Fort Monroe, Virginia, for further
saw to all the multifarious details of pro- tests by the Antiaircraft Artillery Board,
curement and distribution. So it was also then under the Coast Artillery Corps. This
with two most significant ground radars in March 1942. Any skepticism which had
which the Radiation Laboratory developed arisen from the first tests at Fort Monmouth
for use in World War II: the SCR-584 and in December 1941, when the range of the
the MEW, short for microwave early warn- set had proved disappointing, evaporated
ing, or in AN terminology, the AN/CPS-1. during these second tests at the mouth of the
Chesapeake Bay. The range was now far
SCR-584, Microwave Tracking or GL, greater than the 15,000-yard minimum the
Gun-Laying Radar service users required. The accuracy was
uncanny. And the set was stalwart, even
The SCR-584 was a gun layer, the most in its laboratory-built prototype form.
successful single application of the micro- While it stood upon the sea wall at Fort
wave ten-centimeter technique to ground Monroe, overlooking Hampton Roads, a
fighting in World War II. It could auto- violent storm came up; waves beat against
matically track an unseen target at night the wall and salt spray doused the XT-1.
or in cloud or fog, supplying range, azimuth, But the morning after, as the set dried out,
and elevation data to a gun director, which it went into action as usual, none the worse
aimed the guns of a battery. It doubled the for its exposure. The Antiaircraft Artillery
usefulness of big guns. From the time the
64
584 first appeared on the Anzio beach- Baxter, Scientists Against Time, pp. 114-15,
145, 214, 235.
head—where it enabled gunners to play 65
Guerlac, Radar, pp. 699-700 (Sec C, Ch. VIII,
havoc with the air attacks of the enemy, pp 14-15).
266 THE SIGNAL CORPS
Board concluded: "The Radio Set XT-1 In the spring of 1942 the original XT-1,
is superior to any radio direction finding despite its potencies, was still a long way
equipment yet tested for the purpose of from a usable practical military set. When
furnishing present position data to an anti- the Antiaircraft Artillery Board members
aircraft director." The Antiaircraft Artil- wrote their report after testing the set in
lery Board urged the Signal Corps to stand- March 1942, they commented that the
ardize the set and procure it in sufficient XT-1, being a laboratory model, contained
quantities to supply one to each Antiaircraft many makeshift parts which rendered it un-
Artillery gun battery.66 fit as it stood for field use. They recom-
Two weeks later General Olmstead rec- mended some sixteen changes needed to
ommended that XT-1 be standardized as bring the set up to the military characteris-
gun layer SCR-584, simultaneously asking tics they desired in the production gun layer.
a change in the fifth supplemental national For example, the Antiaircraft Artillery men
defense appropriation for the fiscal year wanted tracking to be as automatic in range
1942 whereby 622 sets might be purchased as it was in azimuth and elevation (the lab-
with funds that had been already allocated oratory model required hand-aided tracking
to another gun-laying radar, the SCR in - 54They
range). 5. wanted the antenna mount,
This he had urged after a conference in his its driving mechanism and pedestal, com-
office a few days before with representatives pletely redesigned, a little matter that was to
of General Electric, Westinghouse, the Na- prove a severe engineering and production
tional Defense Research Committee, and problem.68 They wanted this set, intended
the Antiaircraft Artillery Command. Gen- for short-range gun laying, to include pro-
eral Electric and Westinghouse had been so visions for early warning, illuminating upon
optimistic as to estimate completion of the a PPI-type oscilloscope the reflection of
622 sets by July 1943, whereas the bitter planes many miles away, long before they
fact would be that by then actual delivery came within gunshot.69
would scarcely have begun.67 In asking this double function, early
There were cogent reasons for the delay warning and gun laying combined in one
of the SCR-584, reasons arising out of both radar, the artillerymen were not just con-
preproduction engineering changes and pri-
68
ority problems during production itself. Neither General Electric nor Westinghouse
could undertake this task. The United Shoe Ma-
Some of these the Signal Corps inherited chine Corporation and the American Machine
from the Radiation Laboratory; others re- Foundry Corporation could not produce in suffi-
cient quantities. Ultimately, the Chrysler Corpora-
sulted from the military characteristics tion did the job. As subcontractor to General Elec-
which the users desired the Signal Corps to tric and Westinghouse, Chrysler produced for all
SCR-584's the trailer and the precision mechanism
satisfy. to elevate the antenna dish, to stabilize and rotate
the dish itself, and to spin the dipole antenna within
66
Proj. 1218, Col Bowen, AAA Bd, CAC, 20 the dish at nearly 2,000 revolutions a minute. Guer-
Mar 42, sub: Test of radio set XT-1. SigC 413.44 lac, Radar, pp. 703-04 (Sec C, Ch. VIII, pp.
AAA Bd Rpt 1218 on SCR-584 XT-1 (RB-1524). 18-19).
67 69
1st Memo Ind, CSigO to Chief of Standards Memo, SPSRB-1 for Lt Col George F. Met-
Br, Resources Div, and Chief of Development Br calf, 17 Nov 42, sub: Development of radio set
SOS, 7 Apr 42 (basic missing). SigC 413.44 SCR- SCR-584 (NDRC Proj. XT-1). SigC 413.44
584 XT-1 No. 1, Dec 41-Apr 42 (RB-1386). SCR-584 XT-1 No. 3, Sep-Dec 42 (RB-1523).
SIGNAL EQUIPMENT: RADAR 267
juring up engineering and production trou- ground. The 584 tracked them, whereas
bles to harass the Signal Corps. They were long-wave radar would have failed utterly.
following a precedent. The SCR-545, During the summer of 1942 the Signal
which the Signal Corps and Western Elec- Corps Radar Laboratory labored with the
tric already had under development for the production design of the many components
Antiaircraft Artillery Command, incorpo- of the SCR-584. The laboratory report for
rated this double function, as did the British August listed as complete the designs for: 71
GL-3. Both the British set and the Ameri-
power unit
can counterpart employed two different automatic tracking mount
frequencies: (1) a low frequency emanat- receiver power
ing long waves for long-range early warn- azimuth and elevation tracking mount
ing, and (2) a higher frequency radiating amplidyne mount
ten-centimeter microwaves for short range remote video amplifier
70 position indicator
precise gunfire data.
This use of two different frequencies for Nearly completed were the designs for:
two quite different functions was a decided modulator
complication, which the designers of the pedestal and antenna
584 discarded. The Radiation Laboratory receiver
scientists found that they could extend the magnetron
positioning control unit
range of the microwave XT-1 up to 90,000
yards, quite enough for early warning pur- Still in the development stage were the
poses. Then, as targets flew within about designs for:
32,000 yards, the set could begin to serve connection diagram
as a gun layer; the antenna would lock equipment assembly
wiring
onto the target's reflection, automatically interconnection cables
follow it and feed azimuth and elevation
data to the gun directors. Consider for a moment the complexity of
All this could be done without recourse such a device. Basically any radio or radar
to long waves. The ten-centimeter waves consists of three or four elements: a power
of the 584 could do everything longer waves supply, an antenna, a transmitter, and a
could do, and do it much better. The SCR- receiver. As contemplated in the summer of
584 was freed from the handicaps which 1942, the SCR-584 required about 140
inevitably accompanied long waves, siting electronic tubes, of about a score of types.
troubles especially. There were no nulls or The basic transmitter required only one
blind spots. There were no limitations upon tube, the very powerful cavity magnetron
low coverage, a boon when German buzz which made centimeter radar possible. The
bombs began to fly in 1944, darting in level basic receiver did not require an excessive
courses only a few hundred feet above the number, a total of 14. But around the re-
ceiver-transmitter core with its total of 15
70
(1) Memo, Norman Abbott, OCSigO, for tubes thronged a dizzy array of special cir-
O/C Radar and Aircraft Com Br, 26 Apr 42, sub:
SCR-545 mock-up. SigC 413.44 SCR-545 No. 1, cuits, each doing a vital job and each re-
May-Nov 42 (RB-1520). (2) Guerlac, Radar, p.
71
705 (Sec C, Ch. VIII, p. 20). SCRL Prog Rpt, Aug 42, proj. S-29.5, p. 40.
268 THE SIGNAL CORPS
quiring its own gamut of tubes. For ex- microwave set would be no improvement
72
ample: over the 268; for example, it would be
Tubes nearly as heavy. Furthermore, the 541 tied
Azimuth and Elevation Tracking . . . . 16 up components, production facilities, and
Automatic Tracking Unit . . . . . . . . 5 raw materials which could be put to better
Altitude Converter (Control Unit) ... 6
Altitude Converter (Power Unit) . . . . 8 account in the fabrication of the much
Modulator . . . . . . . . . . . . . . . . . 2 2 more valuable SCR-584. As early as April,
Range Power . . . . . . . . . . . . . . . 10 therefore, Rives, Metcalf, and others in the
P P I Power . . . . . . . . . . . . . . . . 7 Signal Corps Radar Division in Washing-
P P I Unit . . . . . . . . . . . . . . . . . 1 8 ton had debated with representatives of the
P P I Scope. . . . . . . . . . . . . . . . . 1
Services of Supply, Antiaircraft Artillery
All this mass, together with operational Command, Ordnance, Westinghouse, and
and maintenance accessories, was packed War Production Board, with a view to rec-
into a van which housed the operators. The ommending cancellation of a contract
van, its load, which included IFF equip- which the Signal Corps had made with
ment (RC-184), together with a trailer Westinghouse for some four to six hundred
containing an electric generator driven by SCR-541's. It was Signal Corps' contention
its own gasoline engine, constituted the that the radio parts accumulated for the
SCR-584, ten tons in all. Small wonder 541, together with raw materials, factory
that one half the total cost of a large 90- production facilities such as tools, space,
millimeter antiaircraft gun battery (four workers, and so on, should be channeled
guns) went to the radar equipment, valued into the production 73
of the new gun layer
at $100,000. SCR-584. This recommendation, as just
Despite its superiority, the SCR-584 did noted, was carried out.
not go into production until mid-1943. But another suggestion, the one General
This was not because of any failure on Sig- Olmstead had made a few days earlier, that
nal Corps' part to push matters. It pushed 584's be purchased with SCR-545 funds,
hard from the very first. For example, the was not adopted. The order for 273 SCR-
Signal Corps succeeded during April and 73
May 1942 in getting the Army to stop pro- Summary of Conf on Radio Set SCR-541 at
OCSigO, 29 Apr 42, signed by Col Metcalf. SigC
duction of a searchlight director radar, the 413.44 SCR-584 XT-1 No. 1, Dec 41-Apr 42
ten-centimeter SCR-541, and to divert this (RB-1386).
SCR-541 and 547 were two of Army's earliest
effort into the 584. The Coast Artillery microwave radars. The 541 had developed out of
Corps had long pressed for a new search- the combined efforts of the Signal Corps, the Radi-
light director, lighter in weight and handier ation Laboratory, and Western Electric. The 547
was a radar range finder. Such a set had been
than the original SCR-268. But as the proposed for use with antiaircraft gun batteries at
SCR-541 approached production in 1942, least as early as 1938. Not till mid-1941 did the
the Army found that in some ways the new NDRC and the Bell Laboratories bring out the
SCR-547 operating on ten centimeters. Called
Mickey Mouse because of its two earlike dish an-
72
Ltr, CSigO to Dir of CESL, 10 Dec 42, sub: tennas, SCR-547 saw service in the war until re-
Vacuum tube list of SCR-584 with Incl, Vacuum placed by the SCR-584. (1) Incl 1, with 1st Ind,
tubes in radio set SCR-584-( ), 18 Dec 42. SigC SCEL Hq to Chief of Tech Info, OCSigO, 30
413.44 SCR-584 XT-1 N o . 4 , Jan-Mar 4 3 ( R&D
Jun 52, cited n. 4 7 ( 3 ) . (2) SigC R B
Hist, -IV, 1 7 0
Pt 2, proj. (413)12-17.1.
RADAR SETS SCR-545 (ABOVE) AND SCR-584 (BELOW). Note IFF antenna
in left foreground of each photograph.
270 THE SIGNAL CORPS
545's remained, and they would begin of the 584 program, which enjoyed nearly
coming off production lines in 1943 a few a top priority of AA — 1. Illogic
weeks before the 584's. No more were or- test models, upon which the entire produc-
dered, however. Meanwhile, the 584 went tion awaited, should languish unrecognized
on order, to the number of nearly 3,000, by the very priority makers who evaluated
with high hopes from Maj. Gen. Joseph A. the rest of the program at AA — 1.
Green, Antiaircraft Artillery commander. manding general of the Army Ground
"By use of this equipment," Green com- Forces was aroused. He particularly wanted
mented, "antiaircraft gun batteries will, for the first four sets in order to initiate training.
the first time, be capable of directing ac- Otherwise, the first procurement sets now
curate fire against unseen targets." One set expected in April 1943 would have no one
he considered a must for each gun bat- who knew how to operate them, however
tery.74 desperate the need of combat Antiaircraft
Neither the 3,000 or so sets which Gen- Artillery units. He asked General Somervell
eral Green hoped to get in 1943 nor even to grant the manufacturer, General Elec-
75
General Olmstead's more sober figure of tric, top AAA priority.
1,175 would attain completion by 1943's One reason for the low priority was se-
end. As already pointed out, priority quirks crecy. Priority makers in the Army-Navy
during 1942 were one cause. Priorities Electronics Production Agency and the War
which were supposed to speed the things Production Board could not get the facts.
most needed in this case caused delay. Four The Signal Corps' contracts with manu-
test models had been put on order with Gen- facturers stipulated, for example, that de-
eral Electric in April 1942 for early deliv- livery schedules and other data touching the
ery. They were needed for preliminary tests, 584 could be made only to Signal Corps
which would inevitably reveal desired members. Such restrictions arose again and
changes and improvements. These changes again, whenever secret equipment was pro-
would then be incorporated in the subse-
cured. Representatives of Chrysler, General
quent production. The four test models
Electric, Westinghouse, and Fruehauf,
therefore should have enjoyed a priority at
among others, all complained of the trouble
least as high, if not higher, than the entire
they encountered when seeking assistance
production. But not so. Their priority was
from the Army-Navy Electronics Produc-
much lower. Summer came and went, and
tion Agency and the War Production Board
yet the four pilot test models failed to ap-
toward getting the 584's produced. Why?
pear. General Olmstead thereupon com-
Because they were forbidden to provide
plained to the Army and Navy Munitions
these agencies with the delivery schedules of
Board priority makers that the reason was highly classified Signal Corps equipment.
clear—production of the four sets suffered Yet how could the priority judges make
from a lower priority, AA — 3, than the rest
75
(1) Ltr, CSigO Chairman of ANMB Priori-
74
Ltr, Green, Hq AA Comd, to CG AGF, 1 May ties Sec, 24 Aug 42, sub: Priorities on radio set
42, sub: Increased proc of radio sets SCR-584 in XT-1 A (SCR-584); (2) Ltr, CG AGF to CG
lieu of radio sets SCR-541, with three Inds. SigC SOS, 8 Sep 42, sub: Priority rating on contract
413.44 SCR-584 XT-1 No. 2, Jun-Aug 42 (RB- for radio sets XT-1 ( A ) . SigC 413.44 SCR-584
1387). XT-1 No. 3, Sep-Dec 42 (RB-1523).
SIGNAL EQUIPMENT: RADAR 271
equitable judgments if they could not be the most laggard of suppliers. Ignorance
adequately informed? 76 and secrecy doubtless helped to prolong the
The Signal Corps' complaint about the delay. Everyone knew airplanes needed
lower priority of the first four 584's touched aluminum and guns needed steel, together
off a minor explosion over the GL radar with myriads of machine tools to fabricate
program. The explosion uncovered some in- the metals. But not everyone knew about
teresting things, as, for example, the fact the electronic devices that controlled and
that the allocation of machine tools to elec-
guided the massive metal mechanisms com-
tronic production was nearly nil. The men
ing off aircraft and ordnance production
who made allocations were vastly impressed
lines. It was easy to see the growing body
by the need for aircraft, and they allotted 60
of the war juggernaut and add to it, but it
percent of all machine-tool facilities to air-
was not so easy to perceive that it had eyes
craft plant expansion in 1941-1942, but
and a network of electronic nerves of radar.
none to plant expansion for the manufac-
Besides, many of the electronic compo-
ture of the electronics equipment which the
nents, and all of the radar, were secret.
aircraft needed. Yet this equipment repre-
Most men, even those in uniform, were not
sented a large percent of a bomber's cost
permitted to see it, or only dimly.
(it would approach 33 percent by the war's
Airmen concerned over air defense had
end). Likewise, ordnance got large allo-
for many months been making clear their
cations, but not GL radar, though, as
need for electronic equipment. Colonel Sa-
pointed out earlier, it would soon constitute
ville, for example, had been especially in-
one half the cost of a 90-millimeter gun bat-
sistent, with the strong support of the Sec-
tery. Not till late 1942 did Signal Corps
retary of War. Yet it was not till late 1942
production needs begin to win recognition
that General McClelland in AAF head-
among machine-tool allocators, when the
quarters asked General Arnold to demand
Corps was granted a parsimonious 4 per-
more money, more factories, more tools for
cent. No wonder manufacture of the huge
electronics, just as the AAF chief had done
radars and of other complex electronic de-
months before for aircraft. By now, late in
vices lagged, while the Army screamed for
1942, the artillerymen began to clamor too,
them and glowered at the Signal Corps as
having just begun to learn the possibilities
76
Memo, George P. Allison, Electronics Br which GL radar offered. At the same time
OCSigO, for Allison, 9 Mar 43. SigC 413.44 SCR- the Air Forces, backed by Secretary Stim-
584 XT-1 No. 4, Jan-Mar 43 (RB-1707). Simi-
larly, production of spiral-four desperately needed son himself, had gotten the best priorities
for the North African invasion lagged in the sum- obtainable for much of their airborne elec-
mer and autumn of 1942 because "the secrecy sur-
rounding the operation was so great that this re-
tronic needs. But the priority makers had
quirement could not be discussed sufficiently to not yet given much thought to ground radar
obtain the needed priorities." Here the block was for artillery and very little thought at all
the secrecy blanketing the invasion rather than the
equipment. But the adverse effect on production to the necessary preliminaries to the allo-
was the same. Capt Sidney L. Jackson, Fixed Wire, cation of raw materials and machine tools.
NATOUSA: Chapter I of Theater Fixed Networks
(1944), SigC historical monograph E-la, p. 12.
At the level of the Joint Chiefs of Staff,
SigC Hist Sec File. Army Ground Forces needs in electronics
272 THE SIGNAL CORPS
were consistently overridden during 1942 badly, then it wanted the equipment im-
by the Navy and the Air Forces.77 mediately, if not sooner. Naturally and
During the autumn of that year, cor- lamentably, it had to wait, and the Signal
respondence flew back and forth between Corps had to endure its fulminations, a state
the heads of the Antiaircraft Artillery and of affairs to which military supply agencies
the Army Ground Forces recounting the must, in the nature of things it seems, be-
significance of the new gun-laying and other come resigned.
ground radars in a manner which reveals On 8 October General Green, in the
how new it all was to the ground Army. headquarters of the Antiaircraft Artillery
The high-ranking correspondents took pains Command, complained to the Command-
to explain the sets, what they were, and ing General, Army Ground Forces, that on
what they did. The sets, they wrote, were information from the Chief Signal Officer
essential for protection of harbors and of he had discovered he would not get any
invasion efforts generally. GL's, either SCR-545 or SCR-584, until
Mighty important, then, was this new some six or seven months after the delivery
application of radar if overseas invasions date originally promised. If the sets arrived
must depend on it. General Eisenhower too late, it would be too bad, to state it
would soon be writing back from North mildly. As Green put it:
Africa saying that he must have something
better than the SCR-268 for gun laying, a If radar equipment is to be used to ad-
refinement for which the 268 was never in- vantage in this war, the development and
tended, but for which it proved better than procurement of newer types of radar equip-
no radar at all.78 Thus the land Army was ment must be pressed to the utmost, and the
slow finding out how badly it needed gun- importance and urgency of this work should
be impressed on all concerned. It is strongly
laying radar, just as the Air Forces had not recommended that every effort be made to
appreciated airborne radar until the turn expedite the antiaircraft radar program, both
of 1940-1941. And until the Army found in development and procurement, and that
out its needs and brought pressure to fill particular stress be placed on the procurement
them, the funds and the support which the of gun control sets and the development and
procurement of a new searchlight control set.
Signal Corps had to have in order to de-
velop and produce the equipment simply
were not forthcoming. When the Army be- General Moore, writing for the Com-
latedly found out what it wanted and how manding General, Army Ground Forces,
agreed. Adding details about other Coast
77
"In the Precedence Conferences, Joint Com- Artillery radars, the 296 and the 582
munications Board, JCS, the Ground Forces were
consistently voted down," commented Col. Byron
(whether for his own enlightenment or for
A. Falk, who was the chief of the Precedence that of General Somervell to whom he ad-
Branch of the ANEPA during the last half of dressed a first indorsement on Green's let-
1942. OCMH Critique of MS, p. 29. SigC Hist
Sec File.
ter), he attributed the delay to the action
78
(1) Ltr, Lt Gen Lesley J. McNair, AGF, to of the priority makers.
CG SOS, 13 Feb 43, sub: Emergency program for
the early proc of a limited number of SCR-584
and SCR -545 antiaircraft radar sets. SigCThis procurement program [of the 296,
413.44
SCR-584 XT-1 No. 4, Jan-Mar 43 (RB-1707). 545, 582, and 584] was disrupted by the action
(2) Craven and Cate. The Army Air Forces, II, 85. of the Precedence Committee of the Com-
SIGNAL EQUIPMENT: RADAR 273
bined Communications Board which set up a Artillery Board had wanted made in the
precedence list for the manufacture of all original XT-1, when it had tested the sets
radar equipment and relegated Coast Artil- in March 1942, called for $10,000,000 in
lery radar procurement to Categories III to
IX inclusive, thereby delaying all Coast Artil- tools alone, before the raw materials were
lery radar manufacture for many months. By assigned and before production could even
this action the procurement of Radio Set begin. Yet the Signal Corps had been fa-
SCR -296 was stopped and certain vored critical
with no such tool allotment. What it
parts were diverted for the manufacture of
had gotten for its manufacturers it had ob-
radar equipment in categories I and II [doubt-
less aircraft radar] in spite of the fact that a tained by diversion from other services.
contract had been let, manufacture was in That had been true till very recently when
progress and many of the SCR-296's were the Signal Corps had been allowed a 4-
nearing completion. Similar action has de- percent tool allotment, still ridiculously
layed the initiation of procurement of Radio
small when one considered the vastly larger
Sets SCR-584 and 545 several months.
percentage electronics shared, on a cost
basis, with the rest of the war production
General Moore urged Somervell to take effort.79
steps "to correct the existing situation" and The little matter of low priority for the
to jack up the precedence of these GL radars pilot models was only one obstacle. There
"to a point which will assure uninterrupted were many others: shortage of raw mate-
procurement in the immediate future." He rials and critical components, such as tubes,
regarded such sets as vital safeguards in the for example, which consumed such rarities
invasions which the military chiefs were con- as tantalum, molybdenum, and tungsten
templating. "Our harbor defenses," he and whose manufacture was most delicate
wrote, "must have the necessary antiaircraft and exacting. Then there were selsyns,
fire control apparatus to assure a safe haven tricky little electric motors and co-ordinat-
for allied naval forces. Our antiaircraft ing mechanisms which enabled the different
units must be supplied with gun laying parts of a large robot to keep in perfect
radars before they can enter combat with step, its motions perfectly synchronized.
any reasonable prospect of success." The order for 584's was going to require
Somervell, no authority on electronics, some 60,000 selsyns immediately. Still an-
sought information from the electronic sec- other tricky component, rejoicing in the
tion of his empire, the Signal Corps—in- name amplidyne, consisted of electrical mo-
formation "upon which a reply may be tors and gears which enabled heavy plat-
drafted." Colton drafted the reply. So far, forms bearing radar antennas and mounts
he showed, the delays at which Green and to rotate, smoothly, precisely, whether fast
Moore chafed were not all the consequence or slow. The obstacles to production sched-
of priority maladjustments at the produc- uling which all these complexities presented
tion level. They were rather a consequence 79
Ltr, Green to CG AGF, 8 Oct 42, sub: Radar
of a priority oversight at a lower, and earlier, Development, with 1st Ind, Gen Moore, Chief of
stage in the development that resulted in Ground Rqmts Sec (writing for CG AGF) to
CofS, 22 Oct 42; 2d Ind, Somervell to CSigO, 31
insufficient machines to tool up production Oct 42; 3d Ind, Colton, Actg CSigO, to CG SOS,
plants. The changes which the Antiaircraft 24 Nov 42. SigC 413.44 Gen No. 3 (RB-1533).
264-211 O - 78 - 19
274 THE SIGNAL CORPS
Metcalf summed up for General Somervell sign, with all the exacting requirements that
80
late in September 1942: daunted several manufacturers, was ac-
cepted by the Chrysler Corporation. Gen-
Delivery of these sets [2,750 SCR-584's and eral Electric and Westinghouse, each with
273 SCR-545's, by General Electric and West- a contract for 1,375 sets, began production,
ern Electric respectively] was previously and by May 1943 the first production SCR-
scheduled to be completed by the end of 1943.
However, the production of Radio Set SCR- 584 was to arrive 82
at the Signal Corps Radar
584, which comprises the bulk of this procure- Laboratory.
ment, is contingent upon a great many un-
certain factors, for example, the extension of MEW, Microwave Early Warning Radar
plant facilities and provision of assembly of
these sets and for production of the special As the gun layer SCR-584 was one bril-
semi-trailer and precision antenna elevating
and tracking mechanism, the allocation of liant application of microwave radar to
various critical raw materials and procure- ground military use, so was another, MEW,
ment of such critical component parts as tubes, also a Radiation Laboratory ten-centimeter
selsyns, amplidynes, etc. Accordingly, on the development. MEW never received an SCR
basis of the best information now available,
the Chief Signal Officer estimates that no
number because it was typed after the
more than about eleven hundred seventy-five Army-Navy nomenclature replaced the
(1175) Radio Sets SCR-584 can be safely SCR designations, and so its official mili-
counted upon for delivery by the end of 1943. tary title came to be AN/CPS-1 (C for
air-transportable, P for radar, S for search).
Thus, production of Signal Corps equip- Its development began in 1942 as an out-
ment such as this giant microwave gun- growth of microwave research at ten cen-
laying radar was big business indeed, in timeters applied to detection of aircraft at
which many an agency participated. In one very great distances. Named microwave
of the early procurement debates respecting early warning, it became abbreviated to
the SCR-584 there sat representatives of MEW. Its range from the start excelled
the Signal Corps Radar Laboratory, the
that of all other radars and vanquished for-
Navy, the War Production Board, the Na-
tional Defense Research Committee, West- ever any claim that long range might be the
inghouse, General Electric, and Chrysler. exclusive prerogative of long-wave sets.
Rives and Elder presided, while Dr. Bowles, Moreover, older long-wave, long-range ra-
Secretary Stimson's radar consultant, at- dars were notoriously affected by their site.
tended. Eventually, the difficult mount de- They were not very accurate either, and
81
80
they could be jammed easily by enemy
(1) Ltr, CSigO to CG SOS, 25 Sep 42, sub:
Rqmts for radio sets SCR-545 and SCR-584. (2)
transmitters operating on their relatively
Ltr, CSigO to Dir of SCRL, 2 Oct 42, sub: Selsyns low frequencies. All these defects the MEW
required for radio set SCR-584. A single SCR-584 swept aside.
required 16 selsyns, 8 motors, and 2 amplidynes.
Ltr, Dir of SCRL to CSigO, 7 Sep 42, sub: Ampli- MEW introduced a new type of antenna
dynes and selsyns. SigC 413.44 SCR-584 XT-1 No. and reflector. The majority of previous
3, Sep-Dec 42 (RB-1523).
81
SCRL, 12 May 42, Summary of Conference on microwave sets had employed a dishlike
Procurement of Radio Set SCR-584 at OCSigO,
82
8 May 42. SigC 413.44 SCR-584 XT-1 No. 1, Camp Evans Sig Lab Prog Rpt, May 43, proj.
Dec41-May42 (RB-1386). 1-584, p. 27.
SIGNAL EQUIPMENT: RADAR 275
antenna reflector called a parabola. MEW continued to track the plane out to 177
employed a reflector which resembled a miles.84
cylinder or pipe cut in half lengthwise. In- The Signal Corps had a representative
stead of a dipole antenna which radiated at the Radiation Laboratory on that day,
from the center or focus of the dish-type Wendell L. Rehm of the Radar Labora-
reflector, MEW employed a long pipe or tory's general engineering section. On the
wave guide running the length of the half- next day, back at his laboratory desk at
cylinder reflector. The wave guide con- Camp Evans, Rehm addressed a memo to
ducted radiations from the transmitter's Maj. John J. Slattery. He called the results
magnetron and sprayed them, through a of the MEW test "quite amazing." The test
number of slots in the guide pipe, onto the airplane, which he called a B-18, was fi-
concave surface of the half-cylinder reflec- nally lost at 177 miles at an altitude of
tor, whence flashed forth a flattened beam. 16,500 feet. He added that radar scientists
Some of the transmitter and receiver com- were already wondering how they could
ponents were attached directly to the back present all the targets which so powerful a
of the large antenna shell, so that the set radar could pick up—whether they might
literally perched on its own antenna array. not have to use a whole battery of oscil-
MEW had a tremendously high power out- loscopes since a single scope could not begin
put of 500 kilowatts at impulse peaks.83 to display everything such a set could "see"
It was the members of the so-called High in an area of land and sky approximately
Power Group (HPG) at the Radiation 400 miles in diameter. One of the scientists,
Laboratory who developed the MEW, and Dr. Lawson, had cautioned him not to be
just before it the SCR-615. Late in No- "too optimistic" until further tests. Ob-
vember 1942, using a makeshift antenna viously, though, the Radiation Laboratory
and reflector atop the main building of the workers were agog and could well be
Massachusetts Institute of Technology, the optimistic.
HPG tested their prodigious MEW against It is worth recording, however, that not
a target (a PBY in some accounts, a B-18 all Signal Corps officers and civilians were
in others) flying southeast from Cambridge, as enthusiastic. A cautious engineer from
beyond the shore and out over the ocean, the Office of the Chief Signal Officer, Nor-
even beyond Nantucket Island. An excited man A. Abbott, attended a conference a few
group of scientists watched the oscilloscope days later at the Radiation Laboratory and
and stuck pins on a wall map as the target's viewed the MEW itself with lusterless eye,
reflection came back from ever farther principally because the set employed so huge
away. The pins marched on across the map, an antenna and reflector and because it had
off its edge, and onto the wall as MEW no provision for determining target altitude,
83
(1) Guerlac, Radar, pp. 645-49 (Sec. C, Ch.
points sure to irk the Air Forces. Abbott re-
VII, pp. 42-46). (2) Memo for File, Capt D. E. ported that Army liaison men at the Radi-
Thomas, Electronics Br, 9 Dec 42 sub: MEW set ation Laboratory thought it "just another
under development of Radiation Lab, attached to
OCSigO R&W Action 1, Capt Thomas to Maj
long-range detector of which there were
McRae, 16 Jan 43. SigC 319.1 Rpts Gen No. 3
84
(RB-1965). (3) Craven and Cate, The Army Air Guerlac, Radar, pp. 649-51 (Sec. C, Ch. VII,
Forces, I, 293-94. pp. 46-48).
276 THE SIGNAL CORPS
several already in existence." 85 This cau- British and the Americans, began to prove
tious military estimate would soon yield to its worth. In aircraft applications the proof
the enthusiasm of the scientists who knew came quickly. The ground application came
how revolutionary this new departure in more slowly, but thepromise of SCR -582
microwave radar was. and 584 and of the MEW was already clear
Thus, during 1942, United States Army by the year's end. These radars would estab-
microwave radar, developed from the lish the excellence of microwave sets on the
pooled military and civilian efforts of the ground, although not until 1944 would the
85
(1) Incl Memo, Rehm for Slattery, 26 Nov 584 and the MEW participate in combat
42, sub: Observations while at MIT Boston, Mass. operations. Then their contributions would
MEW set as being developed by Radiation Lab,
with Ltr, Dir of SCRL to CSigO, 4 Dec 42. (2) be scarcely less impressive than those of the
Memo, Abbott for File, 9 Dec 42, sub: Develop- airborne BTO radar in blind bombing or
ment of SCR-682, SCR-598 and MEW. SigC of the ASV in driving German submarines
413.44 AN/CPS-1 No. 1, Dec 42-Jun 43 (MEW)
(RB-2034). from the seas.
CHAPTER X
Accumulating Strength
Over the World
June-October 1942)
Bolstering the Army Airways ferry route, via airfields in New England,
Communications System Newfoundland, Labrador, Greenland, Ice-
Increasingly as 1942 progressed, Signal
land, and Scotland. The airfield control cen-
Corps men were moving out over all the
ters had to be joined in a dependable com-
munications chain, by links of radio only.
world to assist the global expansion of the
Army Air Forces. Early in the 1940's the Some of the radio stations along the route
Air Corps had begun expanding its air- dispatched flight messages and provided
ways and extending its Army Airways Com- essential navigational aids. Others were
munications System stations far beyond the meteorological stations, spotted in remote
continental boundaries of the United States, northern wastes, such as Baffin Island, far
gradually at first, to Hawaii and Panama distant from the route, in order to collect
and to the outlying bases leased from the and disseminate advance weather infor-
British in 1940, then with terrific accelera- mation, vitally needed if the control sta-
tion in 1942 to such distant lands as Africa, tions were to direct flights safely over the
Australia, and Asia. United States Army notoriously treacherous North Atlantic sky
airplanes were pioneering military airlines, routes. Airways, especially in such remote
air ferries they were called, to move planes, and violently dangerous climates, de-
men, and equipment to combat areas. manded abundant and reliable facilities,
American bombers and fighters were en- facilities of two sorts: communicational and
gaging the enemy in the theaters of war. navigational. Communications called for
Toward both missions, air ferrying and air dependable long-range radio to work with
combat, the Signal Corps contributed ground stations and with aircraft in flight.
heavily. Navigational facilities included radio guide
beams and blind-landing electronic aids.1
Assisting the Installation and 1
The beams might be either the conventional
Operation of Airways Stations A-N radio range or the pulsed signals of the newer,
fantastically accurate loran, half-brother of radar.
A major Air Forces undertaking early in Loran concerned not the Air Forces alone but the
1942 was the build-up of the North Atlantic Navy also, for it could aid the navigation of ships
278 THE SIGNAL CORPS
All this spelled out work for the Signal served on AACS jobs, plugging holes in the
Corps serving the AACS, operated by the undermanned AACS until the Air Forces
Army Air Forces. got more men, as often as not by raiding
At first the work was not always effi- the Signal Corps for technicians to transfer
ciently or very effectively done. According directly into the AAF.
to the Army regulations, it was the Sig- Although along the North Atlantic ferry
nal Corps' job to install and maintain the route the airmen had put in much of their
equipment; it was Air Forces' job to pro- AACS equipment, the Signal Corps had es-
vide the men, specifically units of the tablished installations at Gander and
AACS, to operate the equipment. In ac- Stephenville in Newfoundland, before the
tual operations, however, during the first AACS took them over.2 At Gander a Signal
months of the war, neither did the Signal Corps detachment continued to handle all
Corps have the organization and facilities cryptographic work for the AACS until
to meet completely its share of the joint nearly a year after the airmen had taken
obligation nor did the AAF have enough control of the station from the 1001st Signal
men in the AACS to man all its stations. Service Company. It was March 1942 when
Airway stations sprang up by the score, the AACS acquired from the Signal Corps
nonetheless, along routes which encom- the station at Stephenville. Previously both
passed the globe. The AAF men often in- there and at a station in St. John's Signal
stalled the equipment themselves as best Corps men had handled all the AACS
they could, for want of skilled Signal Corps traffic. 3
crews. Conversely, Signal Corps men often Not only did the Signal Corps thus oper-
ate some of the northern route stations for
at sea no less than that of airplanes in the skies.
The Signal Corps and the Navy, therefore, co-oper-
the AACS, but it sometimes operated them
ated in setting up loran (LRN) installations. For in the southern areas also. For example, two
example, a joint party including Lt. H. E. Toner, enlisted men from the 860th Signal Com-
Signal Corps, Lt. Comdr. L. M. Harding, U.S. Navy,
and others traveled through Alaska in August, Sep- pany had established in February 1942 a
tember, and October 1942, to determine LRN tiny communications station, RCZ, serving
sites, conferring en route with Navy, Air Forces,
and Signal Corps officers in the area (for example,
an Army airfield at San Jose, Costa Rica.
with Col. Ira H. Treest, signal officer of the West- Later, the station acquired two more men
ern Defense Command, and with Colonel Andrews, from the 860th; and, although commanded
commanding officer of the Alaska Communication
System). Memo, Maj Banes, AC, Instl and Maint by Air Force officers, the four Signal Corps
Sec, for Chief of Radio Div, 16 Oct 42, sub: Rpt men continued to man the radio station and
on LRN siting trip, 18 Aug-12 Oct 42. AAG
413.4-R Com Equip.
message center, operating one Hallicrafters
In September 1942 an agreement was struck
2
between the Signal Corps and the Navy regard- Hist Br Hq AACS AAF, The Army Airways
ing the procurement responsibility for loran equip- Communications System, pp. 12, 142. (Hereafter
ment—the Navy procuring ground-station equip- cited as Hist of AACS.) AF Archives 2690-1.
3
ment, the Signal Corps the airborne components. Historical Report, for the 6th AACS Wing, 7
Memo, Lt Col J. R. Cunningham, Chief of Radio Dec 41-31 Dec 43, pp. 2, 6, 10, and chronological
Div AC, for Dir of Com, 18 Sep 42, sub: Loran— introduction, pp. 1-2 under 1941, and pp. 3, 14
Army vs. Navy responsibility. AAG 413.4-P Com under 1942. AF Archives WG-AACS-6-HI, 7 Dec
Equip. 41 (1825-32). (2) Terrett, The Emergency, p. 281.
ACCUMULATING STRENGTH OVER THE WORLD 279
receiver and two BC-191 transmitters under unit continued to do the cryptographic work
4
a second set of call letters, WSJC. until eventually it was transferred into the
Examples of this same sort of intertwined AACS. It was the same way on the Gala-
relationship, illustrating how Signal Corps pagos, where the AACS operated its Sta-
men at first assisted the AACS, then were tion WYRZ in the building which housed
either replaced or absorbed, occurred abun- the Signal Corps administrative station,
dantly along American airways in Central telephone and message centers, and crypto-
and South America. Here, as the Air Forces graphic rooms. Cryptography, here as else-
flung bastions around the Panama Canal where the very last Signal Corps service to
and developed a southern route to Africa, be taken over, was ultimately absorbed
Europe, and the Middle East, Signal Corps when the AACS assumed full control of the
administrative stations and the AACS message center and cryptographic section.5
worked side by side, often pooling their fa- Similarly, Signal Corps units that went to
cilities. At Albrook Field in the Canal Zone, the China-Burma-India theater found them-
the AACS moved Station WZA into the selves doing a great deal of AACS work
central radio building which the Signal because much of the military activity in
Corps maintained there. In it the airmen primitive and remote areas was by air. The
installed and operated their radios and even Tenth Air Force there had to rely upon
utilized the Signal Corps personnel in the Signal Corps units to pinch-hit for AACS.
building to handle their message center and Consider, for example, the one officer and
cryptographic work. The situation was du- 18 enlisted men of Team E, who set up and
plicated in the AACS Stations WYRF and operated an important station for the Air
WYYT, the former at Guatemala City, the Forces in India.6 Arriving at Chakulia in
latter at Rio Hato, Panama. At Rio Hato, Bihar Province, some 200 miles northwest
the AACS, unable to replace Signal Corps of Calcutta, the team members at once con-
cryptographers with men of its own, first verted their mobile 300- watt tran
retained and then absorbed them. conveyed in a K—18 truck, into a fixed sta-
In at least two Pacific outposts in the tion. Work assignments soared as an airfield
southern area, Signal Corps men assisted took shape at Chakulia for the 2d and the
the AACS—on the Galapagos Islands at 490th Bombardment Squadrons, which
Station WYRZ and on the coast of Ecuador were attacking enemy shipping in the In-
opposite these islands, at Salinas, Station dian Ocean. After putting in wire lines and
WYSX. When the AACS arrived at Salinas telephones, the men found that administra-
it found personnel from the Signal Corps tive traffic, the usual Signal Corps chore,
and from the 25th Bombardment Squad- 5
Ibid., pp. 1-24. In Alaska, AACS stations at
ron already in the station handling com- Elmendorf, Ladd Field, Umnak, and Cold Bay
munications, and for a while they all shared long depended upon Signal Corps cryptographers
in the ground forces post signal sections. Third
the same room. Here, too, the Signal Corps AACS Wing Historical Record Report, 1942, p.
28. AF Archives WG-AACS-3-HI, 1942 (1825-
4
Not until 22 July 1943 would the 6th AACS 26).
6
Squadron take over this diminutive station, as Team E was one of the first Signal Corps groups
WYSV. History of the 72d AACS Group, 11 Dec that had landed at Karachi, India, in March. See
40-Sep 44, p. 19. AF Archives SQ-A-COM-153- above, pp. 113-14. It subsequently became part of
HI, 11 Dec 41 (1896-12). the 835th Signal Service Battalion.
280 THE SIGNAL CORPS
was not their only responsibility. They had commander wanted to transfer these men
to handle strictly tactical Air Forces traffic of the 835th Signal Service Company into
too, definitely not the usual task for Signal the Air Forces, Signal Corps tasks demand-
Corps men. ing experienced men in Bombay and Cal-
cutta took precedence, rather exceptionally,
The field was ready when the first B-25 over Air Forces desires, and the Signal
came over and signaled for a landing . . . . Corps men departed to meet the demand.7
There was a telephone net to all the airfields
The story was the same at New Delhi
in the area, a net built through British switch-
boards, over Indian wire, and a poor one be- where, in 1942, the Air Forces desperately
cause of that, but the best the country could needed radio operators, code clerks, and
offer. There was a radio net to carry the load message center men. Another Signal Corps
when the whoop-and-holler telephone system group of one officer and 18 men, Team H,
failed completely. could not itself do all the work and there-
"We'll take care of administrative traffic,"
the 835th men remember saying, "but who'll fore set up a training program, assigning
handle your tactical traffic, the weather, and a detail of five enlisted men to establish a
the air-ground?" school. Their "first class consisted of 17 offi-
"We'll do the air-ground," was the answer. cers and 75 British enlisted personnel. These
"The rest is up to you."
men were trained and placed on duty with
Thus, the 835th men were handed a job
that was normally the full-time work of the the Army Airways Communications Serv-
AACS. Flight instructions . . . targets for ice [i. e., System] until American personnel
today . . . rendezvous . . . bomb-loads . . . could be shipped in to replace them." 8
anticipated enemy action . . . weather . . . Similarly too at Jorhat, in Assam prov-
all this a steady stream of dits and dahs in the
ince, hard against the embattled Burma
headphones of the radio operator. Result of
mission, losses to enemy aircraft and anti- border, still another detachment from the
aircraft fire, enemy planes destroyed—all 835th at first installed (with help from the
pounded out on the brass key of a manual 402d Signal Service Company) equipment
circuit. for the Air Forces and then worked the
traffic until an AACS unit put in its ap-
These Signal Corps men took much sat- pearance.9
isfaction in their hard assignment, for the Thus, at individual airway stations
bombers based at Chakulia were carrying
AACS men and Signal Corps men worked
out successful offensive raids on Japanese
together in 1942 forging the air chains
targets at a time when generally the initia-
tive was in the enemy's hands. For eight which linked North America, to the east,
months the men worked long hours (espe- with England; to the south, with Central
cially long because, lacking a cipher ma- and South America (thence with Africa,
chine, they had to encipher messages the thence northwards with England again, and
long arduous way, by hand on strip boards) eastward with the Middle East and India);
until an AACS unit arrived to take over 7
Sgts John and Ward Hawkins, History of the
the tactical traffic. Even then, Team E con- 835th Signal Service Battalion 1942-1946, pp. 20-
tinued to handle, in addition to administra- 22. SigC Hist Sec File, A47-200, Drawer 15.
8
tive messages, all intrafield communications Not only during 1942 but throughout 1943, the
men of the 835th handled huge numbers of AACS
and weather reports. When the AACS was messages in New Delhi. Ibid., pp. 13, 30.
finally able to handle them and the station 9
Ibid., p. 38.
ACCUMULATING STRENGTH OVER THE WORLD 281
to the northwest, with Alaska and the Aleu- it went to the British to bolster their Libyan
tians; to the west, with Hawaii, and on and campaign, the bulk went into AACS sta-
on, linking with south and southwest Pa- tions—the Signal Corps Aircraft Radio
cific islands, with Australia, and with Laboratory at Dayton, Ohio, converting
China, Burma, and India again. Truly a scores of the radios it had acquired from
11
breathtaking sweep, from the United States hams into usable AACS sets.
to the ends of the earth. By the spring of 1942 the tempo of equip-
ping the AACS had stepped up enormously.
Signal Corps Supply and On 4 June Colonel Rives, Chief of the
Maintenance for the AACS Radar and Aircraft Communications
Branch in the Office of the Chief Signal
Under Army Regulations 95-200 and Officer, said that he "was procuring . . .
105-20 the AACS was to control and op- approximately $91,000,000 worth of radio
erate all the station links serving these air- equipment for use by Army Air Forces
way chains. The same regulations charged [and] Task Forces at airdromes and air-
the Signal Corps with a double obligation: ways." 12 Additionally, the Signal Corps was
first, the development, procurement, stor- accomplishing more than procurement
age, and issue of AACS material; and sec- alone to meet Air Forces blueprints. In fact,
ond, the installation and all major altera- it had itself carried out some of the prelim-
tions of this equipment.
According to the Air Forces, the Signal 11
Incl Tab C, Army Airways Communications
Corps could not at first supply equipment System, with 1st Ind, Somervell to CG AAF, 24
Nov 42, on Ltr, Arnold to CG SOS, 10 Nov 42,
fast enough, and the airmen often took sub: Delayed proc of critical radio and related
steps to obtain radios from whatever equip required by AAF. SigC ( E O ) 475, SigC
sources they could discover, from amateur Equip Gen. For reminiscences of the procurement
of equipment from hams, who "parted with their
radio operators and from commercial air- beloved transmitters and receivers with tears in
10
line stocks. Yet in general the Signal Corps their eyes," see the recollections of Brig. Gen.
met its supply obligation for the AACS well Tom C. Rives, Ret., in "MARS Founder Heads
enough so that it could rebut one of Gen- Electronics Center," MARS Bulletin, III (March,
1952), 45-46.
eral Arnold's chronic complaints about the 12
Memo for File, Rives, 4 Jun 42, sub: Conf
Signal Corps with the statement that "the on proc of equip for AAF, airways and airdromes,
Army Air Forces has made no complaint taskAnforces, etc. SigC 413.44 Gen 1 (RB-1393).
example of the demands which the AACS
about the equipment furnished by the Sig- was making upon the Signal Corps is a request
nal Corps for the Army Airways Commu- which the Commanding General, AAF, made on
nications System. . . ." And if the AAF 25 May 1942. He asked for 1,550 fixed communi-
cation transmitters of seven widely different types;
did get some of its equipment independently 900 navigational transmitters, that is, radio ranges,
from radio amateur hams, the Signal Corps fan markers, and the like; 2,000 receivers; 1,500
got much more, under a carefully devel- 90-foot antenna towers; and enough electric power
oped plan, the Amateur Procurement Pro- generators of proper voltages, phase, and capacity
to provide two sets at each station, plus 25-percent
gram, which brought in about 10,000 pieces spares. Remote control equipment had also to ac-
of equipment purchased for some three company each transmitter so that the actual trans-
mitter site might be several miles away from the
million dollars. While some seventy tons of operating and control rooms. Ltr, CG AAF to
CSigO, 25 May 42, sub: Equip for AACS. SigC
10
Hist of AACS, pp. 227-28. 413.44 Gen 1 (RB-1393).
282 THE SIGNAL CORPS
inary work. In the absence of a compre- of the Office of the Chief Signal Officer,
hensive Air Forces plan toward providing largely ceased to make arrangements for in-
AACS stations, the Signal Corps on its stalling AACS equipment, finding that it
own had made provision for some 400 sta- could not readily contract with competent
tions, in addition to about 50 which had engineers to supervise the work where and
been built or begun before Pearl Harbor. when the AAF desired. Competent men
"On December 7, 1941, less than 50 sta- were hard to come by anywhere, in the
tions were established in areas under the Army or out of it. Further, the Signal Corps
jurisdiction of the United States," General simply lacked anything resembling an ade-
Somervell, head of SOS, informed General quate world-wide organization specifically
Arnold late in 1942, adding that prelimi- prepared to install AACS stations.
nary work had just started on fewer than During 1942, therefore, Colonel Parker
ten stations in newly acquired foreign bases. and his Plant Division in most cases merely
"The AAF provided no plan for the cre- procured the requested equipment and
ation of new stations," Somervell asserted. shipped it to the ports of embarkation. From
"The Signal Corps," he emphasized, "pro- there on, by a sort of informal understand-
ceeded to obtain equipment and on its own ing, the AAF took charge, moving and in-
plan has equipped some two hundred sta- stalling the stuff however it could, often
tions outside the continental limits of the with the aid of its own AACS operators.
United States, in addition to about as many Often, too, the AAF made contracts with
more within the United States." 13
commercial companies, notably with Pan
The supply of electronic equipment for
American Airways in South America and
the AACS was therefore relatively good, but
in Africa, to put in the radio aids. Indeed,
not so the installing of it, not during 1942.
Prior to Pearl Harbor the Signal Corps had the AAF was already doing so much of this
properly installed the equipment it sup- installation work and the Signal Corps so
plied both within the continental United little that General Olmstead in the early
States and in the foreign departments; it spring of 1942 transferred such AACS ac-
had also completed a number of installa- tivity as remained to him, moving it from
tions for the AACS in the Caribbean area the Plant Division to the Radar Division
and in Bermuda.14 Thereafter, amid the under Colonel Rives. He did so at the Air
rush of wartime demands, the Signal Corps Forces' request, on the assumption, Rives
endeavored, whenever it could, to meet its said, that "radar would be the sole contact
installation responsibilities either by con- with the Army Air Forces." 15 Although
tracting with civilian engineers or by assign- Army regulations were still explicit, the Sig-
ing Signal Corps officers, if any were avail- nal Corps was yielding under the pressure
able, to supervise the work. In general, of workday necessities.
though, after the meteoric expansion of air
15
stations all over the world, Signal Corps, in (1) Ibid. (2) Memo for File, Col Rives, 31
Jul 42, sub: Conf on AACS, p. 2. SigC 676.3
its AACS activity under the Plant Division AACS (EO-2-P No. 26). The AACS activity in
the Radar Division constituted the Airways and
13
Incl Tab C, AACS, cited n. 11. Airdrome Section. Indeed, some Signal Corps men
14
Memo, Col Conrad for Col Meade, 17 Jul 42, at this time regarded AACS as meaning "Airways
sub: AACS. SigC 676.3 AACS (EO-2-P No. 26). and Airdromes Control System."
ACCUMULATING STRENGTH OVER THE WORLD 283
The AAF in fact hoped to confirm the Labrador, Greenland, and Iceland. The
temporary control which it now enjoyed AACS had either completed or was com-
over the engineering, installation, and main- pleting the majority of stations serving these
tenance of its AACS equipment by accom- routes when, early in the spring of 1942,
plishing a change in Army regulations. AAF commanders, dismayed by AACS dif-
However, these ambitions were to be frus- ficulties along the skyway, asked the Signal
trated. The AACS was overreaching itself. Corps for technical assistance. But Colonel
Many of the installations put in overseas Rives and the Airways and Airdromes Sec-
functioned poorly, for their personnel had tion of his Radar Division could spare no
not been trained for this sort of work. They one to render the help the Air Forces de-
were not engineers. AACS men were in- sired. The Signal Corps, therefore, made a
tended to be operators only; Army regula- contract, the AAF consenting, with the
tions so specified. As Colonel Conrad in the Raymond Wilmotte Engineering Company
Executive Office of the Office of the Chief of Washington, D. C., to lend aid. As Rives
Signal Officer wrote on 17 July: "It has be- explained on 31 July, "trouble was first
come evident that Air Force personnel are encountered in the northeast route and later
not achieving the maximum possible opera- in the Caribbean area. The Signal Corps
tional efficiency. This last is mainly due to was still doing very little of the installation
poorly trained personnel, lack of experi- work . . . . The Air Corps," Rives said,
enced installation crews and some negli- "asked for technical service and in view of
16
gence on the operators' part." the fact that Radar Division had no per-
sonnel to furnish such service, the services
BOLERO, Mishaps in June; of the Raymond Wilmotte Engineering
Impact on Signal Corps-A ACS Relations Company were employed to do the job on
the northeast route." 18
Troubles harassed the North Atlantic Things had gone badly. In February 1st
ferry route especially, the air link so essen- Lt. Crocker Snow, commanding the North
tial to BOLERO, at stations where the diffi- Atlantic Sector of the Air Corps Ferrying
culties arising from the inexperience and Command, had reported that communica-
ignorance of the men were compounded by tions northeast of Presque Isle, Maine, were
trials peculiar to the far north, such as poor a "mess." In March he had made an
electrical grounding in permanently frozen analysis of what he felt to be the main diffi-
sandy or marshy terrain, and in particular culties besetting the route: poor communi-
the transmission fade-outs caused by the cations, a serious shortage of weather
aurora borealis.17 personnel and of weather facilities, poorly
The North Atlantic ferry route was
double-tracked: one airway, for four- 18
Memo cited n. 1 5 ( 2 ) , p. 2. The trouble in the
engined planes, proceeding directly from Caribbean evidently involved supply as well as
installation. In consequence of an AAF complaint
Gander Lake to Prestwick; and the other, about AACS equipment shortages, especially in the
for twin-engined aircraft, reaching Scotland Caribbean area, General Somervell asked Olm-
stead on 21 May to improve his methods of pro-
by a series of shorter flights, by way of curing, storing, and issuing and so to expedite
shipment. Ltr, Somervell to CSigO, 21 May 42,
16
Memo cited n. 14. sub: Status of shipment for various items of equip.
17
Hist of AACS, pp. 135-36, 141. SigC 413.44 Gen 1 (RB-1393).
284 THE SIGNAL CORPS
performing radio and range stations, insuffi- along the route. He was, in brief, "dissatis-
cient maintenance and operations person- fied." General Spaatz, commanding the
nel, inadequate airdrome facilities, and all Eighth Air Force in England, had occasion
but primitive messing and housing arrange- for similar feelings after he had taken off
ments. Through April both personnel and early in June from the Presque Isle Army
radio navigational aids had remained in- airfield on two attempts to fly to Goose Bay
adequate. Then on 18 June, only a few days and had to turn back each time, not because
before the first BOLERO flight was scheduled, of weather, though it was adverse, but be-
an inspection of the route indicated that cause ground communications had been im-
delays in receipt of weather information and possible. Static, he recorded, was bad, but
in its dissemination arose mainly because equally bad operating procedure on the
inexperienced communicators, and crypto- part of ground communicators had stymied
graphic and weather officers failed to co- communications. And without communica-
ordinate their work well.19 On 19 June the tions there could be no air ferrying. Spaatz
signal officer in the First Corps Area, Col. urged that the best airlines communications
James H. Van Horn, reported that he had expert in America be sent with authority to
found the facilities at Goose Bay, Labrador, reorganize the communications links.22
and the morale of the men equally bad.20 But before anything either specific or gen-
Subsequently, General McClelland in Air eral could be done, the first BOLERO flight
Forces Headquarters summed up the BO- ended in disaster. Eighteen B-17's took off
LERO mess, saying "probably due to the from Presque Isle for Goose Bay on 23 June.
exigencies of the situation at the time, the All arrived safely. So far so good, but on the
communications system, if it could be called second leg of the flight three days later, only-
a system, on the North Atlantic airway was half arrived at their destination, Narsars-
not 'engineered' but was a loosely coordi- suak, Greenland, six having to turn back to
nated effort to get something ready in time Goose Bay while the remaining three crash-
for projected movements." 21 landed. Undoubtedly, communications fail-
Such halfway measures may suffice in ure contributed largely—as Tom Rives put
many hectic wartime situations, but in air- it in a nutshell: ". . . when they cracked
way communications they will not do. The up the 3 B-24's [they were B-17's]—these
late spring of 1942 meanwhile heard the ships cleared from Goose Bay to Greenland.
voices of high ranking Air Forces officers After they had cleared the weather turned
swelling the chorus of complaints. In May bad on them. There was a number of ships
General Arnold fumed at the communica- involved in the flight and they called and
tional and meteorological inadequacies told them to go back. Part of the flight got
19 22
History of the Air Transport Command, Fer- (1) Incl Tab D, paraphrase of radiogram 1739,
rying Command Operations, 7 December 1941-30 London, Lt Col [Milton W.] Arnold to AGWAR,
June 1942, pp. 166ff. AF Archives, Maxwell Field. 28 May 42, with Memo, CSigO for Lt Gen Henry
20
Memo, Van Horn for Col French, 19 Jun 42, H. Arnold, 12 Sep 42, sub: Action to assume duties
sub: Reference rpt submitted to Van Horn by Lt and responsibilities in connection with the AACS.
Soney, SC. SigC 676.3 (CG CEB) Canadian Ferry SigC 676.3 AACS (EO-2-P No. 26). (2) Incl 1,
Route. Radio Msg, Spaatz to Arnold, 13 Jun 42, with
21
AAF R&R, McClelland to AF ATC, 10 Oct 42, Memo, Lt Col F. L. Smith for Dir of Com, 16 Jun
sub: Additional radio facilities, North Atlantic 42. AAG 413.4-L Com Equip. (3) Craven and
Wing. AAG 413.4-Q Com Equip. Cate, The Army Air Forces, I, 348.
ACCUMULATING STRENGTH OVER THE WORLD 285
the message and acknowledged. The rest motors injected strong interference into their
didn't get the message. The operator on the communication circuits.24
ground thought that all had gotten it. Some At Washington headquarters a series of
cracked up." 23 disputes beginning in July eventually led to
The first BOLERO flight precipitated a the resuscitation of AACS installation activ-
showdown on the question of who was re- ity in the Office of the Chief Signal Officer.
sponsible for AACS installation and mainte- Stoner, Meade, Conrad, and others speak-
nance. The matter came to a quick boil, ing for the Signal Corps, and Marriner,
both along the ferry route itself and in Wash- DeArmond, and others for the Air Forces,
ington headquarters. Along the route the agreed that at the moment neither was
airway stations fell under close scrutiny. In "properly equipped" to make quickly and
August Captain R. H. Freeman from Plant efficiently all the installations of which the
Division, accompanied by representatives AACS had so desperate and immediate a
from the Air Forces and from the Civil need outside the continental United States.
Aeronautics Administration, inspected The conferees agreed that the Civil Aero-
nautics Administration was best supplied
AACS facilities at Presque Isle, Goose Bay,
with the needed personnel qualified by long
Sondrestromfjord, Narsarssuak, and Reyk-
experience in the intricate ways of radio
javik. All the installations, Freeman wrote ranges, marker beacons, and the like. Instal-
to Colonel Parker, showed obvious engi- lation crews composed of these men, to-
neering defects. Antennas, both transmit- gether with some Signal Corps men, it was
ting and receiving, had been put up with- thought, could do the job. Direction of the
out thought as to their directional charac- work would be taken from the Radar Divi-
teristics. In some cases they presented the sion and returned to its original place in the
angle of minimum efficiency toward the Plant Division.
distant stations with which they communed. Further conferences on 28 and 31 July
The operators were crowded and used blar- sought to clarify just who would do what.
ing loudspeakers which drowned one an- Even within the Signal Corps it was not easy
other out. In some cases, they worked in to separate intertwined equipment and
noisy aircraft hangars, where various electric functions—VHF radio, for instance, would
remain a responsibility of the Radar Divi-
23
(1) Memo cited n. 15(2), p. 7. (2) Samuel sion, presumably because of its employment
Milner, "Establishing the BOLERO Ferry Route," in the radar stations of the Aircraft Warn-
Military Affairs, XI: 4 (Winter, 1947), 220. (3)
Craven and Cate, The Army Air Forces, I, 644. (4) ing and Intercept Services.25
For an on-the-spot account, see Memo, Jansky,
24
Operational Analyst, for Saville, 9 Jul 42, sub: Incl Tab E, Memo, Freeman for Parker, 10
Com along Labrador, Greenland, and Iceland route Sep 42, sub: Summary of inspec trip of northeast
to England. AAG 413.4-M Com Equip. Cyril M. air ferry route, with Memo cited n. 2 2 ( 1 ) .
25
Jansky, Jr., a radio engineer returning from a tour (1) OCSigO R&W Action 1, Meade to Dirs
of inspection in England for the AAF (Saville's of Army Com Sv and of Sig Supply Sv, 18 Jul 42,
Directorate of Air Defense), was accompanied by sub: Conf for formulating plan for instl of AACS
Dr. Everitt, prominent electronics engineer whom stations; (2) Min of Conf, Maj Fell, OCSigO
General Olmstead had sent on a European tour of Planning, 28 Jul 42, sub: AACS and associated
inspection, in order, among other things, to investi- activities; (3) Min of Conf, 31 Jul 42 (bearing
gate and make recommendations to correct engi- Stoner's concurrence, dated 2 A u g ) . SigC 676.3
neering and operational defects of AACS stations. AACS (EO-2-P No. 2 6 ) .
286 THE SIGNAL CORPS
All this the Deputy Chief Signal Officer, installation and maintenance to the Air
General Code, summed up for General Ar- Forces. Meanwhile, pending a decision, the
nold on 5 August, informing him that the AAF said it would try its utmost to make
Airways and Fixed Radio Branch, set up on the existing arrangement suffice and toward
29 July in the Plant Division, "will, upon this end agreed to assign at once two liaison
notification of requirements to be furnished officers to Plant Division in order to co-
by the Commanding General, Army Air ordinate matters pertaining to airways com-
Forces, engineer all installations, taking into munications. Yet these liaison officers failed
account the operational requirements of the to appear promptly and a few days later
Army Air Forces and will procure, store, Parker summed up his views of the situa-
issue, install the equipment, and arrange tion in bald terms: 27
for all maintenance other than First Eche-
lon, and will utilize to the fullest the facili- ... It would appear that no great effort
is being made by the Air Corps to comply with
ties of the Civil Aeronautics Administration, the understanding reached in the above men-
signal officers of the various Service Com- tioned conference, and it is my belief that this
mands, and such other agencies, civil or action is being purposely delayed in order to
military, as are available." provide time for them to present their case to
the General Staff. I am, furthermore, of the
At the same time responsibility for deter- opinion that we ... should take steps at the
mining requirements was split between the earliest practicable date to prepare reasons
two corps. The Commanding General, why such a move would not be desirable and
Army Air Forces, was made responsible for that such advance action as is necessary and
practicable be taken to acquaint the General
determining AACS requirements "for air- Staff with the fact that the Signal Corps, if
ground and flight dispatching circuits, given the cooperation of the Air Corps, can do
weather circuits, and radio aids to naviga- the job in a satisfactory manner.
tion, specifically including marker beacon,
Thus some airmen did not accept either
direction finding and radio range equip- the requirements laid down by Army regu-
ment." The Chief Signal Officer was made lations or the Signal Corps' efforts to com-
responsible "for determining the need for ply with them. This intolerable situation
administrative radio stations." 26 soon exploded, sparked as usual by the Air
Despite this agreement, the Army Air Forces. On 12 September, Colonel Smith,
Forces remained dissatisfied. Hardly a speaking for Marriner, director of commu-
month after the agreement, on 2 Septem- nications in AAF headquarters, told Col-
ber, it developed, at a conference includ- onel Meade: "We feel that we should be
ing Colonel Parker, head of Plant Divi- charged with all engineering, installation
sion, and Col. Wallace G. Smith from the and maintenance of Army Airways and as-
Air Forces, that the latter had in mind to sociated administrative and supply radio
submit a recommendation to the General channels and are taking steps to prepare a
Staff for transfer of responsibility for AACS 27
(1) OCSigO R&W Action 1, Parker to Dir of
Army Com Sv and Dir of Planning, 7 Sep 42. SigC
26
Incl Tab A, Ltr, Code to CG AAF, 5 Aug 42, 322.08 PEA 1, Jul 40-Dec 42. (2) Memo for Red,
sub: Procedure in establishing AACS related radio Maj Fell, 2 Sep 42, sub: Conf on method of pro-
facilities, with Memo, CSigO for Arnold, cited n. viding AACS Com Facilities. SigC 676.3 AACS
22(1). (EO-2-P No. 26).
ACCUMULATING STRENGTH OVER THE WORLD 287
264-211 O - 78 - 20
290 THE SIGNAL CORPS
ships rather than to attempt to ferry them merous were the mobile 270's and 268's, the
by air. The CRIMSON project was then aban- latter especially, 76 of which were in use
doned altogether. by task forces at "locations unknown," 69
of them out of San Francisco, 7 out of New
Radars for Aircraft Warning Orleans. So Lt. Col. James R. Rearden,
charged with the Installation and Mainte-
Another demand which the Signal Corps nance Branch in the Office of the Chief
was meeting for the Air Forces involved Signal Officer, informed Colonel Rives,
radars for aircraft warning. By mid-1942 Chief of the Radar Division, on 14 July.39
numerous Signal Corps ground radars were The mobility of the American sets was
standing vigil at scores of sites from Iceland becoming an important factor as 1942 wore
to India. A tabulation made in July showed on and as Allied plans contemplated offen-
that the five corps areas which guarded the sive movements. While British radars held
American coasts had over 250 radars in the first place in the estimation of officers in
service: 2 SCR-271's, 70 SCR-270's, and the Air Forces Headquarters at the outset,
194 SCR-268's. The Ninth Corps Area, the fact that the SCR-270 was relatively
facing the Pacific, enjoyed the lion's share, more mobile became a telling point. By the
having 31 SCR-270's and 127 SCR-268's. end of May the Signal Corps had been in-
The remaining sets were scattered along the formed that "most of the SCR-270's now
eastern coast in the First, Second, Third, being procured will be used to equip Task
and Fourth Corps Areas.38 Forces." 40
Now, as theaters of war were opening up As invasion deadlines approached, quite
increasingly in the Pacific and were on the a rush developed for 270's, and for the
point of opening up in Africa also, the Sig- mobile short-range SCR-268's also. The
nal Corps had to procure, install, and main- AAF was using all Signal Corps' production
tain more and more radars, both for in- of SCR-270 and 271, together with many
creased defense of the homeland and for SCR-268's intended originally for use by
protection of American positions abroad. the Coast Artillery Corps. For example, in
Already, many scores of American 268's, July Signal Corps' Installation and Mainte-
270's, 271's, and 516's were serving the nance Branch sought to provide the Air
Army in an amazing variety of locations: Forces, "for use in BOLERO," with 48 SCR-
to the eastward—in Iceland, Greenland, 268's, together with a quantity of spare
Newfoundland, Bermuda, Panama, Puerto parts sufficient for one year's operation.41
Rico, Trinidad, Ascension Island, and Li- 39
(1) Incl 2, Quantity of SCR-268, 270, 270-B,
beria; to the westward—in Alaska, Ecua- 271, 271-A, 516, and others overseas at locations
dor, Galapagos Islands, Hawaii, Christmas as indicated, with OCSigO R&W Action 1
(SPSMA 1854) cited n. 38. (2) Ltr, CG AAF to
Island, Canton Island, the Fijis, Aitutaki, CSigO, 24 Aug 42, sub: Installation priorities, steel
Tongareva, Tongatabu, Bora Bora, New antennas. AAG 413.4-P Com Equip.
40
Caledonia, Australia, and India. Most nu- Rpt of Conf on SCR-270 and SCR-271, 25
May 42. SigC 413.44 SCR-270-271 12-H, May
38
Incl 1, Distribution of Ground Radar Sets in 42 (RB-1131).
41
Continental U. S., with OCSigO R&W Action 1 Incl, Weekly Prog Rpt I&M Br, 9-15 Jul, Item
(SPSMA 1854), Lt Col James R. Rearden, O/C 2c, with OCSigO R&W Action 1, Rearden to Radar
I&M Br SPSMA-6, to O/C Radar Div, 14 Jul 42, Div, 16 Jul 42, sub: Info and status rpt unit, Radar
sub: Ground radar maint. SigC 413.44 Radar In- Div (SPSMA 1875). SigC 319.1 Rpts Gen, May
stallation 3, Apr-Sep 42 (RB-1537). 38-Aug 42 (RB-781).
ACCUMULATING STRENGTH OVER THE WORLD 291
At about the same time the AAF asked and the marines a 270 and a 271 on
44
for a large number of the fixed 271's. The Samoa.
AAF had on order 357 SCR-270's when, While Signal Corps radars were thus
in early July, it expressed a desire that only moving out into the field in considerable
20 percent of them be delivered as mobile quantity during 1942, the Air Forces stub-
sets; the rest the AAF now wanted con- bornly continued to demand copies of Brit-
verted to fixed SCR-271's, possibly because ish ground sets too. Because Air Forces and
the manufacturer, Westinghouse, along British advisers had thought British radar
with some 90 subcontractors the country would be the answer to American Aircraft
over, was ahead of the production sched- Warning Service requirements, they influ-
ule (the 271 was easier to produce than the enced the War Department's thinking that
270). Accordingly, the Signal Corps Radar the American sets would eventually yield
Laboratory prepared to have 286 of the to the supposedly superior CH, CHL,
mobile sets converted into fixed SCR-271's, GCI/CHL and so on. Canadian factories
196 of them equipped with 100-foot an- were to produce the GCI/CHL as SCR-
tenna towers, the rest with 50-foot arrays. 588. This radar did not become abundant,
Of these fixed radars, the Air Forces indi- however, while Signal Corps' SCR-270 and
SCR-271 became increasingly available and
cated that 215 would be erected outside the
moreover were not inferior. Yet the AAF
United States.42
staff, retaining its predilection, continued
The Navy, too, put in requests for these through the year demanding such cumber-
Signal Corps radars. By August, it was some long-wave sets as Saville and Watson-
pressing vigorously for 270's, having a high Watt had urged upon them in January and
priority for 28 sets to serve task forces February.45 In April Colonel Marriner,
scheduled to sail in September. These, speaking for the AAF, had listed its expected
added to 52 already on order for the Navy ground radar needs. Every type he named
plus another 42 for the marines, totaled
44
122 mobile radars. Besides, the Navy had an (1) Incl Ltr, CO U.S. Naval Air Station, Mid-
way Island, to Comdt Navy Yard, Pearl Harbor,
order in for 16 fixed SCR-271's also.43 9 Apr 42, sub: Radar, with 1st Ind, CSigO to Dir
For some time previously, the Navy had of SCRL, 2 Jun 42 (basic missing). SigC 413.44
SCR-270-271 12-H, Aug-Sep 42 (RB-1133). (2)
been using an SCR-270 on Midway Island Incl Ltr, CO U.S. Marine Corps, 2d Defense Bn,
to Comdt U.S. Marine Corps, 20 May 42, sub:
42
(1) Ltr, Capt A. L. Vieweger, O/C Prod Engi- Fld Info on AW equip, with Ltr, CSigO to CG
neering, to CSigO, 23 Jul 42, sub: Radio sets SCR- AAF, 31 Jul 42, sub: Navy Rpt on radar perform-
271-D. SigC 413.44 SCR-270-271 12-H, Jun- ance. AAG 413.4-B Radar Equip, 1942.
45
Jul 42 (RB-1132). (2) Rpt of Conf cited n. 40. See above, pp. 93-102, passim, CH's, Chain
43
(1) Ltr, CG AAF to CSigO, 20 Aug 42, sub: Home sets, were the first British search radars whose
Priority list for SCR-270-( ) and SCR-271-( ) two and three-hundred foot towers formed a chain
for August; (2) 3d Ind, CG AAF to CSigO, 1 Sep of defense around the English homeland. Inciden-
42, on Ltr CSigO to CG AAF, 30 May 42, sub: tally, the wave lengths of the British CH, MRU, and
Unexpended funds for equip for AWS. SigC 413.44 TRU were long indeed, so long as to be comparable
SCR-270 -271 12-H, Aug-Sep to the
42wave lengthsThe
(RB-1133). of high frequency radio. For
Navy had already received 29 SCR-270's and 271's CH, they were 15 meters long, 20.4 megacycles; for
by July's end. 1st Ind, Marriner to CSigO, 7 Aug TRU, 7 meters long, 43.75 megacycles. Memo,
42, on Ltr, CSigO to Dir of Com AAF, sub: Im- Maj Fell for record, 30 Oct 42, sub: CH Stations.
provement for SCR-270-(271). AAG 413.4-N Com SigC 413.44 British Equip 6, May-Nov 42 (RB-
Equip. 1527).
AIRCRAFT WARNING RADARS. The fixed SCR-271 on He des Pins in the South-
west Pacific (above) and the mobile SCR-268 in Greenland (below).
ACCUMULATING STRENGTH OVER THE WORLD 293
was British, CH, MRU, CHL (both fixed Meanwhile, pressure for British ground
and transportable versions), GCI, fixed and radar for the Army Air Forces began to
transportable; and finally, portable sets peter out. The radars could not be had in
which the British designated LW, light quantity, whereas Signal Corps sets were
warning. For four of them, the CH, the becoming increasingly abundant. For in-
MRU, and the TRU (identical except for stance, by July when Colonel Rearden tab-
mobility), and the portable LW, the only ulated the several hundred 268's, 270's, and
source was England itself. "The procure- 516's which were in service, he could list
ment of one hundred MRU sets," Marriner only nine British sets: three in Iceland (one
had emphasized, "is a matter of the highest ACH and two CD/CHL's) and six in Pan-
urgency." 46 ama (four SCR-588-A's, Canadian copy
By August Col. Clay Hoppough, on Sig- of the CHL, and two SCR-588-B's, copies
49
nal Corps detail with the Army Air Forces, of GCI/CHL's). Besides, they were old
was asking for 60 LW's for the BOLERO types, already outmoded. But before pass-
50
project. "It is the understanding of the ing from the American scene, these Brit-
Commanding General, Army Air Forces," ish radars, which had given the Signal
he wrote, "that orders have been placed for Corps many a headache, lent a parting
200 British LW (lightweight portable) sets. shove to an Air Forces movement which
There is a requirement for 60 of these sets relieved the Signal Corps from its obliga-
for the BOLERO project." He wanted also 9 tion to install and maintain Aircraft Warn-
MRU sets, 6 TRU's, 3 CHL's, and 19 ing Service ground radars.
GCI's, specifically for BOLERO. "Steps Installation and maintenance of the
should be taken," he urged, "to procure Corps' many radars all over the world,
these sets in sufficient time to utilize them chiefly for the AAF and its Aircraft Warn-
for the BOLERO project." Simultaneously, ing Service, placed upon the Signal Corps
he repeated the request for a dozen huge
a need for an organization and for facilities
CH stations for home defense, which Sa-
which had not existed at the beginning of
ville had sought so urgently early in the
year.47 Some of these British sets arrived from U. K. to U. S.; (2) Memo, SCRL for Lt
in the United States in due course, a TRU, Col Paul E. Watson, 10 Sep 42, sub: TRU pro-
for example, evidently the first on 29 gram; (3) Ltr, CG AAF to CSigO, 27 Nov 42,
sub: CH radar program. (4) An MRU arrived on
August, and a very meager scattering of 5 October. Ltr, G. W. Hignett to Col J. M. Piner,
others during the last months of 1942.48 9 Oct 42. (5) An LW was ready to leave U. K. in
October. Memo, Seitz for CSigO, 15 Oct 42, sub:
46
(1) Ltr, Marriner to CSigO, 21 Apr 42, sub: RDF equip. File cited n. 47. (6) Two CH sets
Procurement of ground radar equip for U. S. SigC arrived in New York on 2 November. Ltr, Hignett
413.44 British Equip 5, Jan-Apr 42 (RB-1155). to Saville, 2 Nov 42. AAG 413.44-B Radio.
49
(2) Col Metcalf, 21 May 42, Weekly Prog Rpt Incl 2 with OCSigO R&W Action 1 (SPSMA
of Radar Div, May 14—20. Weekly Achievement 1854) cited n. 38.
50
Rpts, 27 Apr-8 Jun 42. SigC Central Files. The AAF canceled its CH program altogether
47
Ltr, Marriner (signed by Hoppough) to in the spring of 1943. (1) Ltrs, CG AAF to CG's
CSigO, 11 Aug 42, sub: Proc of British radar First and Fourth Air Forces, 25 Jan, 22 Jun 43, sub:
equip. SigC 413.44 British Equip 6, May-Nov 42 Instl of transportable radar units ( T R U ) in West-
(RB-1527). ern and Eastern Defense Comds. AAG 413.44-N
48
(1) Memo, Lt Col John F. R. Seitz, Exec In- Radar. (2) Ltr, Colton to Dir SigC Ground Sig Sv,
ternational Div, SOS, Washington, for CSigO, 2 12 Apr 43, sub: British CH-TRU-MRU equip.
Sep 42, sub: RDF equip requested for transfer SigC 413.44 Brit equip 9, Apr-May 43 (RB-1913).
294 THE SIGNAL CORPS
1942. It soon became a galling problem Island, Christmas Island, Curacao, Fiji Is-
which the Signal Corps tried to solve by lands, Galapagos Islands, Iceland, India,
various means. Early in the year the re- Mexico, Newfoundland, New Caledonia,
sponsibility of training men to site and New Hebrides, Samoa, Society Islands,
install the sets had been specifically charged Tongatabu, and Trinidad.44
to the Signal Corps Radar Laboratory at These arrangements, however, neither
Camp Evans. By May, Maj. Paul E. Wat- satisfied nor sufficed. As the war moved
son, executive officer at the laboratory, into the second half of the year with pros-
had outlined plans for an Installation and pects of ever more overseas installation of
Maintenance School at the camp.51 For a radar, especially of such portable types as
while the school turned out radar crews, the British LW which could be used in tac-
not many but enough, it seems, to keep up tical operations during invasions, there arose
at first with the current needs. Colonel the same problem that had plagued the in-
Rearden, after visiting the laboratory in stallation of Army Airways Communica-
July, reported that "temporarily the pro- tions System equipment: who would install
duction of radar maintenance men has ex- the sets promptly when and where the Air
ceeded the production of the apparatus." 52 Forces wanted them? The existing arrange-
Crews had gone out, or were going, to ment by which the Signal Corps provided a
widely scattered places. Of the 204 civilian few civilian crews was unsatisfactory under
radar installers who were already overseas, war conditions overseas. The Air Forces
64 had received special training. Twelve wanted military crews, subject to military
of them were in Alaska, 21 in Puerto Rico, restraint and compulsion, to put in the
69 in Panama, 89 in Hawaii, 5 in Trinidad, equipment in unpleasant, if not dangerous,
5 on Ascension Island, and 3 in Australia.53 sites abroad, jobs which civilians were prone
For the time being, the Signal Corps to decline, or quit.55 And whereas during
planned to make much wider use of civilians these summer months of 1942, the AACS
for the maintenance of radars since it did installation problem was being solved in Sig-
not have enough trained men in uniform. nal Corps' favor, in radar the responsibility
Thus General Olmstead contemplated for installation and maintenance went to the
sending civilian maintenance men to As- Air Forces.
cension Island, Australia, Bermuda, Canton The problem of responsibility touching
radar installation came to a head in argu-
51
(1) OCSigO R&W Action 1, Maj Watson to ments over the anticipated British CH sets,
Col Rives, 15 May 42, sub: Siting of radar equip. whose installation would pose great diffi-
SigC 413.44 SCR-270 -271 12-H, May 42 (RB-
1131). (2) Memo, Watson for Dir of SCRL, 4 culty. This already obsolescent radar re-
May 42, sub: Proposed Instl and Maint School at quired several towers, each several hundred
SCRL. SigC 413.44 Radar Installation 3, Apr-Sep
54
42 (RB-1537). Memo, CSigO for ACofS, Opns Div, through
52
OCSigO R&W Action 1 (SPSMA 1854) cited CG SOS, 24 Jul 42, sub: Civ radar maint crews,
n. 38. overseas locations. SigC ( E O ) 413.44 Radar Equip
53
(1) Ltr, CSigO to Dir of SCRL, 8 Jul 42, Gen, 1942-44.
55
sub: Instl crew. SigC 413.44 Radar Installation 3, The Signal Corps experienced the same trouble
Apr-Sep 42 (RB-1537). (2) Incl 3, Capt G. L. with civilian employees. See Ltr, Col Ankenbrandt,
Claybourn, Rpt on Civ Pers Assigned to Foreign SigO South Pacific Area, to Col Lanahan, OCSigO,
Stations, 14 Jul 42, with OCSigO R&W Action 1 2 Feb 43, p 5. SigC Opns Br 111, Col Anken-
(SPSMA 1854) cited n. 38. brandt's Rpts.
ACCUMULATING STRENGTH OVER THE WORLD 295
feet high. As early as June General Somer- have on hand to do the work? He would
vell had considered transferring the respon- have to look to the Signal Corps. And Fell
sibility to the Air Service Command, which added, "We have no organization to supply
would have the right to use Signal Corps military people." As for the civilian crews
personnel during an undefined period while that the Signal Corps Radar Laboratory had
ostensible control would still be required of been training, Fell remarked, "Colonel Cor-
56
the Chief Signal Officer. Now in Septem- put [director of the laboratory] gets the
ber General Code, the Deputy Chief Signal people to the place [overseas] and they quit
Officer, wanted to know if the Air Service on him." 58 When the first CH was reported
Command wished to take over the job of on its way to American shores in October,
putting up the CH's—a long-term task another group in conference decided that
which would consume a year or more, Code this first set should go to the Signal Corps
thought—or did General Arnold desire that Radar Laboratory where installation crews
the Signal Corps do it? 57 would receive training, both civilian crews
Twelve CH's had been ordered by the for stateside installation and military crews
Signal Corps for the Air Forces. Ten were (Air Forces supplying the soldiers) for the
planned for the vicinity of large coastal installations in Panama.59
cities like New York. Two would go to Meanwhile, General Arnold substan-
Panama. The thorny problem of installation tiated the policy to which Somervell had
now became unavoidable, especially regard- consented in June toward giving complete
ing TRU's, planned for overseas positions. responsibility to the AAF for erecting and
For this work the Signal Corps had no mili- maintaining its ground AWS radars. "The
tary organization, although it had the knowl- Air Service Command," Arnold now wrote,
edge, while the AAF lacked even the latter. "is in the process of taking over the respon-
On 25 September the problems were de- sibilities for the installation and mainte-
bated during a conference between members nance of ground radar equipment used by
of the Signal Corps, the Air Forces, and the components of the Army Air Forces. . . .
Royal Air Force. The Signal Corps had They will continue to assume this function
found it difficult to get men for overseas as rapidly as they are able to do so." Code
installations. When Major Fletcher, from replied that the Signal Corps would assist by
the Air Forces' Directorate of Air Defense, training the first CH crews and would fur-
brought up the intent to use "in overseas nish instructions and operational and main-
positions" the British TRU's, Maj. Charles tenance manuals. Thereafter, the AAF
F. Fell of Olmstead's Directorate of Plan- would take over the installation, mainte-
ning remarked that the responsibility for put-
58
ting them up would fall to the theater com- Summary of TRU, CH Conf at OCSigO, 25
Sep 42, attached to Ltr, Corput to CSigO, 5 Oct
mander. But whom would the commander 42, sub: Transmittal of summary on TRU, CH
Conf; also min of conf, pp. 3-5. File cited n. 57.
56 59
Ltr, CG SOS to All Corps Area Comdrs and (1) Memo, Capt James E. Keely, O/C Ground
CGs of Defense Comds, 2 Jun 42, sub: Maint and Radar Sec-2, for Cols Metcalf and Winter, 11 Nov
instals of radar equip. SigC 413.44 Radar 2, Jul- 42, sub: Conf, 26 Oct 42; (2) 2d Ind, CSigO to
Dec 42. CG Fld Svs ASC, 30 Nov 42, on Ltr, Maj G. Sel-
57
Ltr, Code to CG AAF, 2 Sep 42, sub: Instl of wyn, SigC, to CSigO, 5 Nov 42, sub: Electrical
ground radar equip. SigC 413.44 British Equip 6, calculators CH (RDF). SigC 413.44 British Equip
May-Nov 42 (RB-1527). 6, May-Nov 42 (RB-1527).
296 THE SIGNAL CORPS
nance, and operation of its ground radars.60 Australia, China, Burma, and India. By
Thus ground radars for the Air Forces, mid-year 150,000 Army troops had been es-
radars which the Signal Corps had de- tablished in the South and Southwest Pacific
62
veloped and in the use of which it had areas. The defensive turned into a limited
pioneered, were moving out of Signal offensive in July after General Marshall
Corps' hands. The operation of the equip- and Admiral King signed the Joint Di-
ment, explored and defined by the Signal rective for Offensive Operations in the
Corps during its organization of the prewar Southwest Pacific Area agreed on by the
Aircraft Warning System, along with the United States Chiefs of Staff." 63 On 7 Au-
related tasks of installing and maintaining gust the marines landed on Guadalcanal
the sets, passed wholly to the using arm be- and were followed before the year's end by
fore the first year of World War II was out. Army troops.
The organization and control of the aircraft
Hawaii
warning units, wherein the Signal Corps
also had pioneered, had already, hard on Honolulu was the center of Pacific op-
Pearl Harbor, passed to the Air Corps. erations. As American forces spread out
Now, toward the end of 1942, only Signal over the Pacific, the radio tentacles of WTJ,
Corps' basic responsibilities for radar devel-
opment ACAN stationand at Fort Shafter, multiplied.
procurement would remain
True, the Japanese had lopped off the
with the parent organization.
61
Radars on Philippine stations in May 1942, but new
the ground as well as in aircraft had be- circuits quickly reached out along the route
come essential to Air Forces' mission, and to Australia during the spring and sum-
the Signal Corps was supplying the sets in mer.64 Shafter's most heavily used circuits,
increasing numbers. toward Melbourne in one direction and, in
the other, to San Francisco's WVY and to
Defense to Offense in the West Washington's WAR, were now high speed,
using Boehme equipment but still requir-
Whereas in mid-1942 the invasion of ing much laborious hand-typing into the
North Africa became topmost in Army's 62
Biennial Report of the Chief of Staff, 1941-43,
planning and toward it the Signal Corps p. 15.
63
John Miller, jr., Guadalcanal, The First Offen-
would amass men and equipment, the Pa- sive, UNITED STATES ARMY IN WORLD
cific arena remained uppermost in the mind WAR II (Washington, 1949), pp. 16-17.
of the American public. There, far to the The circumstances of the Pacific war increased
Army and Navy co-operation, especially in com-
west, America's military men had first to munications. On 23 September the Traffic Divi-
plan a holding action against the Japanese. sion in Office of the Chief Signal Officer reported
the first use, in all communications with the South
This meant creating and strengthening bases Pacific, of JANP, Joint Army Navy Procedure.
not only in the South Pacific but also in The Signal Corps message centers in San Francisco
and Honolulu were co-ordinated with WAR in this
60
1st Ind, CG ASF to CSigO, 16 Sep 42, and 2d initial application of JANP toward standardizing
Ind, CSigO to CG AAF, 28 Sep 42, on Ltr, Code and speeding the flow of military messages. Weekly
to CG AAF, 22 Sep 42, sub: Instl of ground radar Digest-Traffic Div, Prog, 23 Sep 42, Item 1 A 3,
equip. File cited n. 59. signed by Lt Col Clinton B. Allsopp. SigC 319.1
61
And only for two more years at that, at the Drawer 483, AC 133, Weekly Digest of Prog and
end of which they too would be taken over by the Problems, Rpts from Divs 7-30-42—12-30-42.
64
increasingly powerful Army Air Forces. See above, pp. 109-10.
ACCUMULATING STRENGTH OVER THE WORLD 297
Boehme perforated strips and out of them. Signal Corps activities under Colonel
The other circuits remained entirely man- Powell waxed varied and tremendous.
ual, transmission being accomplished solely ACAN radio and WTJ were but one part
by hand-tapped keys. Traffic loads in busy
of his responsibility. There were numerous
WTJ had been running about a half a
million words a month at the outset of wire nets in the islands, for example, no
the war and were now far exceeding that, less than 45,000 circuit miles of fire control
so that doubtless Colonel Powell, Signal Of- cable alone by the war's end.66 His supply
ficer at Fort Shafter, and his harassed radio and depot responsibilities—storing, issuing,
operators of the 9th Service Company rel- maintaining, repairing—grew heavier with
ished their first introduction to automatic each Army division dispatched to the Pa-
equipment in October, when an installation cific, beginning with the 27th, which had
crew from WAR put in IBM radiotype. arrived in Hawaii in March 1942. The
The very first tests on the direct WTJ- Hawaiian signal office, moreover, provided
WAR channel Colonel French in WAR all the fixed-station equipment of the Army
described on 28 October as "very favor-
able." 65 66
History of Signal Section, appended to History
65
(1) See above, p. 222. (2) Weekly Digest of Subsection G-2, HUSAFMIDPAC, United States
Traffic Br, Prog, 28 Oct 42, Item 1 A 11. File Army Forces, Middle Pacific and Predecessor Com-
cited n. 63. mands, Vol. I, Sec. IV, Wire, p. 1. OCMH.
298 THE SIGNAL CORPS
Command and Administrative Network for way to a spirit of offense. Fears for northern
the Pacific area.67 Australia diminished by mid-year as the
In July Army signal intelligence activity enemy's push south now began to yield to
in Hawaii received a badly needed boost the Allies' counterefforts. The north shore of
with the arrival of the 101st Signal Com- New Guinea and the Solomons became the
pany, Radio Intelligence (RI). Previously, front line, and in June General MacAr-
the activity had been woefully weak. There thur moved his headquarters north, from
had been a monitoring station on the islands Melbourne to Brisbane. The ACAN station
since 1935. At the outbreak of the war it moved too, followed in September by the
was Station Five, operated by a detachment USASOS headquarters which switched, not
from the 2d Signal Company, under op- to Brisbane, but to Sydney.
erational control of the Chief Signal Officer So it was that by mid-1942 Station WVJJ
in Washington, but administered and super- at Brisbane was becoming the nerve center
vised by Colonel Powell. It remained puny of the Southwest Pacific ACAN system,
in size and ability, lacking even direction replacing WTJJ at Melbourne. The circuits
finders to determine the direction whence from Sydney, Townsville, Darwin, Noumea,
came the signals it monitored. During the and Honolulu were now relocated to ter-
first months of the war the Army depended minate at Brisbane. Great expansion en-
upon the Federal Communications Com- sued, as American and Australian forces,
mission to provide direction-finding facili- reacting to their earlier defeats, began to
ties, to maintain, in general, the signal se- consolidate their strength and make their
curity of the Hawaiian Islands, and to first victorious advances. New equipment
guard against subversive radio activity. The was flowing in. WVJJ transmitters multi-
main job of Station Five was to intercept
plied and their power increased to 10 and
and study Japanese Army radio traffic. To
build up this activity the Secretary of War then to 40 kilowatts.
had informed the Commanding General, Following the progress of the armies, the
Hawaiian Department, on 31 March 1942, web of fixed Army communications, ACAN
that he was sending the 101st Signal Com- stations, extended further northward. A new
pany, Radio Intelligence, which would channel, direct from Brisbane to San Fran-
carry out its mission under the Signal Corps' cisco, was accompanied by ramifications of
68
Intelligence Service in Washington. the Southwest Pacific local networks; for
instance, a significant one to the north went
Southwest Pacific to work in September between Brisbane and
Installations for ACAN Port Moresby, New Guinea (WVLQ). 69
The Port Moresby radio, significant ad-
In Australia the defensive attitude of the vance though it was, still fell pitifully short
gloomy early months of 1942 had given of reaching the few survivors of Bataan and
67
(1) Ibid., pp. 5, 12. (2) Dr. Donald O. Wag- Corregidor, now holding out as guerrillas
ner, Army Command and Administrative Network, and suffering relentless pursuit. As of mid-
1941-1945: Pt. I, The Pacific, SigC historical
monograph E-6, p. 11. SigC Hist Sec File. October, the latest radio contact by Mac-
68
(1) Hist of Sig Sec, Sec. VIII, Signal Intelli-
69
gence, pp. 1-3, cited n. 66. (2) Ltr, TAG to CG Wagner, Army Command and Administrative
Hawaiian Dept, 31 Mar 42, sub: Intercept direc- Network 1941-45, Pt. I, p. 25, and chart dated 16
tive. AG 311.23 (3-30-42) NC-B. Feb 43.
ACCUMULATING STRENGTH OVER THE WORLD 299
Arthur's headquarters in Brisbane with the mitted, "learned how open wire-lines should
14th Infantry, Philippine Army, had been be built." 72
made on 7 August. At that time the guer-
rilla force explained that imminent danger Southwest Pacific
from the Japanese was compelling it to close Communications for USASOS
70
down its radio transmitter. But the so-
called "guerrilla network" in the captive The Army Command and Administra-
Philippines continued to operate, sporadi- tive Nets constituted only a part of the sta-
cally. Portable radio sets—in the hands of tions and circuits which it was Signal Corps'
fugitive Americans, Filipinos, and others, duty to provide. Other nets had to be set
some of whom were smuggled in by sub- up for the supply services. Supply of armies
marine—continued to transmit reports on is so vast an undertaking that it requires
Japanese activities, assisting Allied opera- its own separate communication systems of
tions and the subsequent recapture of the is- wire and radio nets to handle the endless
lands in 1944.71 bookkeeping details which otherwise would
Late in 1942 Signal Corps units in Aus- harry administrative and operational com-
tralia such as the 436th and 440th Signal municators. In some minor areas of activ-
Construction Battalions began constructing ity, one single communication set-up may
considerable landline wire links through serve all functions. But generally the Signal
northeastern Australia, especially, in the Corps finds it necessary to establish separate
vicinity of Townsville. They also constructed stations and separate nets for the supply
an alternate landline for part of the tele- service of the Army. A good example of
phone system connecting the Brisbane in- Signal Corps' effort toward communications
stallations with those at Melbourne and for the supply function overseas is afforded
Sydney as well as at Townsville. This sys- by the Australian nets beginning in mid-
tem ran close to the coast. An alternate line 1942.
inland seemed desirable in case of enemy In July 1942 Col. Calvert H. Arnold be-
action along the coast, and this they built came the Signal Officer of the United States
also. Besides building new lines, they made Army Services of Supply in the Southwest
use of existing Australian facilities, which Pacific Area (USASOS SWPA). 73 Shoul-
they found they had to alter not a little. All dering his large burden at first at Mel-
this long-line telephone work they accom- bourne, Arnold presently moved to Sydney,
plished under the eye of the Australian Post-
72
master General, who insisted upon placing (I)Ibid., p. 26. (2) Ltr, Col John C. Grable,
Exec OCSigO USASOS SWPA, to Col Parker,
his own supervisors over Signal Corps con- Plant Div, 10 Dec 42; (3) Maj J. W. Lea, SC,
struction jobs. Communication procedures, Proposed Application of Telephone and Telegraph
equipment, and construction methods dif- Carrier Systems, 12 Sep 42. SigC (AC) 331.1
Inspec Trip to S and SWPA, Maj A. E. Wharton,
fered considerably between Australia and 1942.
the United States. "The so-called super- 73
His Signal Section at SOS headquarters em-
visors," one of the Australian officials ad- braced divisions for Administration, Cryptography,
Personnel, Procurement and Fiscal, Planning,
70
Msg, MacArthur [to WD] (06651) No. C-716, Radio, Wire, Supply, together with the Message
15 Oct 42. Msg Log File, Staff Com Center. Center serving the SOS headquarters. Hist of
71
Wagner, Army Command and Administrative USASOS and AFWESPAC, Ch. XXIX, Signal
Network 1941-45, Pt. I, p. 48. Corps, Jul 12-Mar 43, p. 1. OCMH.
300 THE SIGNAL CORPS
opening the SOS headquarters radio station October and took in northward-reaching
there on 6 September. A week later the new stations at Cairns, Cooktown, Portland
Sydney radio opened channels to Mel- Roads, and Home Island, all in Australia,
bourne, to Brisbane, and, five days later, to together with Merauke, westward along the
Townsville, Honolulu, and Darwin, and south coast of New Guinea. While some
74
then on 28 September, to Noumea. channels closed down, their purpose hav-
The Services of Supply maintained base ing been served after the tactical picture
section headquarters at Brisbane and at changed (for example, the Merauke and
Townsville. It maintained an advanced Home Island stations closed on 5 Novem-
base section in Port Moresby. A large 10- ber), other new ones opened: Townsville-
kilowatt radio served the Brisbane base sec- Darwin on 10 November, Townsville
tion. Beginning operation in mid-July, it Moresby on 12 November, Townsville-
provided channels to Melbourne, Sydney, Portland Roads on 25 November.
Townsville, Darwin, Noumea, Honolulu, In Port Moresby itself, the signal office
and San Francisco. Another channel of the U.S. advanced base set up for busi-
opened in mid-September bringing in Port ness in August 1942, establishing links at
Moresby.75 once to Townsville and Brisbane with such
From the major stations in the base sec- radios as could be had at first. In fact,
tions, local networks fanned out liberally Arnold's men began setting up communi-
and Arnold had to provide fixed radio cations at Moresby before any American
equipment for all of them (not very fixed combat troops arrived. Col. John C.
either, since they shifted frequently as the Grable, Arnold's executive signal officer,
tactical situation changed and the men wrote to Colonel Parker in Plant Division
moved on). During the late summer and exclaiming that "we, as an SOS, are being
autumn of 1942 there were radio nets op- required to do considerable work in combat
erating around the clock along truck convoy zones and of a type that corresponds more
routes, as for example along the route to combat work than SOS functions." 76
through the Australian interior from Subsequent radio links took form as fast as
Townsville to Darwin, with stations at Signal Corps men could acquire the equip-
Night Camps No. 1 and No. 2, at Helen ment, in particular two additional channels
Springs, Birdum, and Adelaide River. to Townsville established in November as
There were low-power radio sets at Cairns the Papua Campaign intensified and the
and Mount Isa in the Townsville base sec- flow of messages increased. Local nets
tion net. In the same base section area, two spread out from Moresby as the offensive
low-power radio stations perched on Cape moved on against the Japanese. For exam-
York jutting north into the Coral Sea look- ple, before the year's end a low-powered net
ing toward New Guinea, in order to relay serving SOS needs linked Port Moresby
messages to and from the Allies who were with Milne Bay at the tip of New Guinea
now locked in the Papua Campaign. and with Oro Bay on the north shore, near
Another radio net which Arnold and his the bitter battleground of Buna.77
men operated for the SOS Base Section No.
76
2 at Townsville opened for business on 6 Ltr, Grable to Parker, 10 Dec 42, cited n.
74
72(2).
77
75
Ibid., pp. 21, 54. Hist of USASOS and AFWESPAC, Ch.
Ibid., p. 29. XXIX.
INSTALLATION AND MAINTENANCE OF SIGNAL EQUIPMENT included such
assignments as installing radio equipment in aircraft (left, above), repairing radio compasses (right,
above) in Australia, and the operation of general repair shops (below) in New Guinea.
302 THE SIGNAL CORPS
(2) the 10th Communication Region of only one teleprinter and three telegraph sets;
the AACS; (3) the India Air Task Force; three typewriters, except that one had been
(4) the China Air Task Force; (5) the lent to the Navy; an assortment of re-
Karachi Tactical Area; and (6) the Cha- ceivers and generators, transformers and
bua Tactical Area. In the early autumn of power units; and a 300-watt continuous
1942 representatives of each of these units wave transmitter (BC-447), supplemented
came together in order to draw up a theater by another, of 40 watts, borrowed from the
signal plan, detailing the duties of each sig- Navy. On duty with this equipment were
nal officer and specifying the extent and 6 officers and 16 enlisted men, rather than
operation of all nets. Aside from general the required 14 officers, 49 enlisted men.
supervision and co-ordination, the principal Brig. Gen. Claire L. Chennault's air force
duties of the theater signal officer, Maj. had two radio nets: one administrative, one
George L. Townsend, were allocation of tactical. The first served the Air Service
call signs and blocks of frequencies, with Command, the second the China and India
clearance by the Indian and Chinese gov- Air Task Forces and the Karachi and Cha-
ernments, and technical control of the air- bua Tactical Areas. To the Air Service
craft warning system. The actual planning Command net went men and officers of the
and co-ordination of the AWS, however, 861st Signal Service Company, the 43d Sig-
was the function of the signal officer of the nal Company Service Group, the 83d Signal
Tenth Air Force, Col. S. S. Lamb, who was Company Service Group, the 235th Signal
also responsible for maintaining channels Operations Company, and detachments of
between his headquarters and those of the certain Air Corps units (the 51st Fighter
four subordinate tactical forces. The local Control Squadron and the 7th Bombard-
Air Service Command had its own admin- ment Group). 82
istrative net, and so did the theater Services After the Signal Corps' first large trans-
of Supply. The 10th Region of the AACS, mitter in India, at Karachi, had begun op-
officially relieved of administrative traffic, eration in April 1942, satellite stations
devoted itself solely to its part in service and rapidly sprang up. During the summer New
tactical aviation. Delhi in Central India became the net con-
The United States Army Forces, CBI sig- trol station, serving the whole area, one
nal plan, seeking to assure military commu- far-reaching circuit excepted: New Delhi-
nications in these remote areas of the world, Karachi-Washington. Three local networks
expressly encouraged a resort to naval, com- radiated from New Delhi, one using a
mercial, or Allied Air Forces facilities "when 300-watt Federal Transmitter, reached to
available and suitable." In his headquarters Karachi on the west; another using a BC—
at Chungking, at theater field headquarters, 447 of similar power, reached both south
and north, respectively to Bangalore and to
and at signal branch offices in New Delhi
Allahabad; the third, using a 300-watt Fed-
and Ramgarh, General Stilwell had such
eral, reached to Chabua, Calcutta, and
communication facilities in use as could be
Ramgarh, all lying eastward toward China.
supplied. Little enough they seemed, for the
At Karachi there were two nets: the origi-
major items in use at Chungking included,
for example, only one telephone switch- 82
Consolidated Signal Plan, USAF CBI (29 Sep-
board (BD-72) and 13 phones (EE-8); 7 Oct 4 2 ) . SigC CC 676, CBI Signal Plan.
ACCUMULATING STRENGTH OVER THE WORLD 305
nal long circuit to Washington on a 10- on a part-time basis. The reason given was
kilowatt BC-339 and 340, and a net em- that the facilities were already overloaded
bracing New Delhi, Asmara in East Africa, by British military traffic. Wire lines were
and Chungking in China, all using 300- eventually provided, however, by new
watt transmitters. Chabua in eastern India Army construction on a "project" basis or
had two nets, one to New Delhi and one to by exploiting the organizational equipment
Kunming and to Chungking, using 300- of certain units for local communications.84
watt sets also. Chungking's return circuits
to Chabua and Karachi used a 300-watt Strengthening Eastern Outposts
transmitter borrowed from the Navy. There
were numerous lesser Signal Corps radio All this varied and romantically remote
channels, too, operating in those faraway Signal Corps effort in the Pacific and the
lands: Ramgarh to New Delhi, Bangalore Orient, however, was but a sideshow, a de-
to New Delhi, Allahabad to New Delhi, cidedly subordinate arena of activity. Amer-
Calcutta to New Delhi, Kunming in China ican military planners were looking east-
to Chabua in India. In China there were ward over the Atlantic to the defeat of
two local nets which belonged originally to Germany first. The enemy in the Pacific
the American Volunteer Group: one from would have to wait.
Chungking to Linchow, Lingling, Kweilin,
Chinkaiang, and Hengling; the other from Iceland
83
Kunming to Yunnanyi and Changhi.
American forces in CBI relied at first In Iceland on the northern route to
almost entirely on radio, and naturally so, Europe the Signal Corps by mid-1942 had
both because of the distances involved and supplied the equipment needed to complete
because the native wire networks were the radio stations serving ACAN. Yet ade-
rather ineffective. Early in 1942, however, quate and reliable quantities of electrical
the Indian Government Department of power for the big transmitters remained a
Posts and Telegraph provided local tele- problem until late in September when the
phone communications for United States Signal Corps mended matters by sending a
Army use through civilian switchboards at large 35-kilowatt generator for the main
New Delhi, Karachi, and Calcutta. In June transmitter and eight lesser ones (four of
negotiations began for the installation of a 7½ -kilowatts and four of 5-kilowatts) to
switchboard at New Delhi by the Army and
the Indian Government for exclusive mili- 84
Wagner, Army Command and Administrative
tary purposes. Meanwhile, the Army ex- Network 1941-45, Pt. II, pp. 77-78.
Air Forces wire nets by 24 November 1942 in-
perienced difficulty in getting the use of cluded a teletype circuit between New Delhi and
teleprinter circuits for longer distances even Agra, and other lines between Jorhat and Kinjik-
hoa; Tinsukia, Dinjan, and Barhapjan; Chakulia
83
Wagner, Army Command and Administrative and Ramgarh; Chakulia and Calcutta; Chungking
Network, 1941-45, Pt. II, China-Burma-India, and Peishiyi. An SOS wire net diagram of this same
pp. 70-71. Signal Corps teams that moved out from date shows circuits from New Delhi to Lahore to
Karachi during the second half of 1942 were Team Karachi; from New Delhi to Bombay and to Banga-
1, in July, to Ramgarh, Bihar Province; Team 5, in lore; from New Delhi to Calcutta and to Cha-
July, to Kunming, China; Team E, in October, to kulia; from Calcutta to Tinsukia. The CBI Signal
Chakulia. Hawkins, History of the 835th Signal Corps story to mid-1943 is continued below, pp.
Service Battalion, 1942-1946, pp. 8, 20, 23. 460-67.
264-211 O - 78 - 21
306 THE SIGNAL CORPS
87
serve the smaller ACAN radios which com- project would never be completely finished,
municated with Greenland, Iceland, and for the defensive character of the war which
with each other within the local Iceland net. had drawn America into Iceland and which
There was no standby for the big 10-kilo- had made the island's defense seem impor-
watt transmitter on the Washington-Iceland tant at first, was now changing to the of-
circuit. But there was the peacetime Ice- fensive. An offensive which, if it no longer
landic radio station at Vatnesendi, and this contemplated BOLERO and the immediate
the Signal Corps sought to lease. Negotia- invasion of Europe, did envision TORCH and
tions initiated through the State Department war upon the Axis in Africa.
led to a contract early in November, where-
upon Radio Vatnesendi not only became a Panama to Trinidad
valuable standby facility in case of emer-
gency but also began at once to carry traffic, Iceland was but America's left hand ex-
assisting the now heavily loaded ACAN cir- tended to England. The right arm reached
cuits routed through Iceland.85 down around the Caribbean and out toward
Beginning in July 1942 the 26th Signal Africa. The South Atlantic route paralleled
Construction Battalion put in many miles the northern in importance. Along the way
of open lines, put up an aerial cable catenary Panama had its own tremendous signifi-
crossing over the Olfusa River at Selfos, and cance, of course, because of the Canal. By
strung aerial cable between Utskalahammar June 1942 Army's uttermost efforts to bol-
and Castle Hill. When the Signal Corps pro- ster its defenses were showing results. Even
posed assigning this battalion to General the Signal Corps received some encourage-
Eisenhower to serve in North Africa, Eisen- ment, despite the dark report which Wat-
hower refused, answering that its work in son-Watt had leveled in March against
Iceland was too vital to be interrupted. He American radar and aircraft warning meas-
cited as especially important its work toward ures. Brig. Gen. Harry C. Ingles, former
completing facilities for the airdrome at Signal Officer in Panama and now chief of
Keflavik and toward strengthening the air- staff for the commanding general, had told
craft warning system on the island.86 The Colonel Rives, Chief of the Radar Division
wire project, called "Latitude 65," con- in the Office of the Chief Signal Officer, that
tinued to occupy Signal Corps men on Ice- "in spite of Mr. Watson-Watt's damning
land; for example, the 54th Signal Battalion report, which was a most casual survey as
put in many miles of tape-armored subter- he was here only three days, our Aircraft
ranean cable and aerial cable, too, under Warning Service is not so bad and is im-
proving rapidly." Ingles added, "There are
the severest kind of weather and over most
two basic faults which we knew long before
difficult lava rock and muskeg terrain. The
we ever heard of Mr. Watson-Watt,
85
1st Lt Charles R. Novick, A Story of Signal namely: defective siting of some sets and
Communications in Iceland, SigC historical mono- totally untrained personnel." 88
graph E-4a, pp. 13-14. SigC Hist Sec File.
86 87
(1) Capt Frederick Reinstein, Signal Corps Reinstein, Signal Corps Fixed Communications
Fixed Communications in the European and Africa- in the European and Africa-Middle Eastern The-
Middle Eastern Theaters (1945), SigC historical aters, pp. 10-11.
88
monograph E-7, p. 11. SigC Hist Sec File. (2) OPD (1) Ltr, Ingles to Rives, 19 May 42. SigC
to CG ETO (05648) Nos. R-2073, 17 Oct 42, and 676.3 AWS Panama, 3 (RB-2162). (2) See above,
4014, 24 Oct 42. Msg Log File, Staff Com Center. pp. 100-101.
ACCUMULATING STRENGTH OVER THE WORLD 307
Warmly encouraging was a personal note be able to track our own pursuit, communi-
to the Chief Signal Officer from Lt. Gen. cate with them and to make satisfactory in-
Frank M. Andrews, commanding in the terceptions under normal operating condi-
89
Panama and Caribbean areas, who wrote tions."
to "Dear Dawson" on 9 June: The new VHF radio facilities (100-156
megacycles) were already in place in some
Reference your letter of June 5th, Dr. of the Caribbean ground stations; for in-
Bowles arrived here Sunday and has already stance, transmitters and receivers SCR-562
started to work. I am sure, from my talk with
him yesterday morning, that he is going to be and 563 at Henry Barracks on Puerto Rico,
very helpful. also VHF direction finders, SCR-565 and
How is everything coming with you? We 566, at Cerrote, Corozal, Fajardo, and
are still pestering you about personnel and Maunabo, all on Puerto Rico, and also on
equipment, but I know that you are doing all St. Thomas and St. Croix in the Virgin
you can for us. The truth of the matter is that
we have got a pretty elaborate and expensive Islands.90 Even so, it would be early 1943
radar set-up down here which is of very little in the Caribbean, as elsewhere, before
use to us until we can complete the picture. VHF intercept facilities would become
For example, even when we do get a good plot completely integrated and implemented
of an incoming airplane we cannot make a with SCR-522 and IFF on every aircraft
satisfactory interception because we cannot
accurately track our own pursuit and cannot co-operating with ground VHF and GCI
reliably communicate with it. Everybody is radar.
interested, however, and is working hard. Upon completion of long-range high fre-
Equipment is coming in and the situation is quency radio (2-20 megacycles) installa-
improving.
tions both for ACAN and for AACS, busi-
ness was now booming. ACAN work loads
General Olmstead replied gratefully to
in the Caribbean Command headquarters
this, one of the relatively few good things
waxed mightily, the load on the Quarry
anyone had to say of the Signal Corps and
Heights-Washington channel ( W V L -
its labors in the early days of World War II.
WAR) multiplied fifteen times over dur-
"It is a pleasure," he replied on 16 June,
ing 1942—from 362,000 words a month
"to know that someone in the field appreci- 91
to 5,388,725. By the autumn of 1942 the
ates the enormous job that remains for the
welter of air communications serving the
people here to do." He summarized the
myriad fields and flight activities along the
equipment situation, relative to identifying
South Atlantic ferry route began to shape
friendly airplanes and communicating with
into an organized pattern. For service from
their pilots. "IFF equipment," he wrote,
field to field, the 325th and the 327th Sig-
"should be available on the aircraft in the
nal Companies, Aviation, were responsible;
Canal Zone at a very early date. The VHF
ground equipment will be shipped to Pan- for communications from plane to plane
ama for installation within the next sixty 89
(1) Ltr, Andrews to Olmstead, 9 Jun 42; (2)
days. The Radio Set SCR-522, which is Ltr, CSigO to Andrews, 16 Jun 42. SigC 413.44
the airborne portion of the VHF equipment, Radar Equip 1, Oct 41-Sep 43 (RB-1386).
90
Maj John H. Baker, Communications and
is being installed on airplanes at the pres-
Radar in the Area of the Caribbean Defense Com-
ent time. . . . When the equipment is oper- mand 1940-1948 (1948), p. 109. OCMH.
ating," Olmstead concluded, "you should 91
Ibid., p. 107.
308 THE SIGNAL CORPS
and from plane to field, the airmen were at Santa Ana, El Yunque, and St. Thomas,
responsible. and a 270 at Borinquen. No less than nine
By now the accumulation of installations 271's were to be delivered between August
and equipment was becoming impressive. and October in the Trinidad sector, which
Along the South American coast, for ex- included St. Lucia, British Guiana, and
ample at Curasao, Hato Field possessed a Aruba-Curagao. Already fourteen SCR-
BC-410 working point-to-point communi- 268's were on Trinidad for the use of the
cations, also a BC-460 serving this purpose Coast Artillery. Improvement in radar op-
too, plus air-ground. Much more equip- eration, siting, and calibration was steady
ment was on order: radios and a radio as the crews grew in experience and as the
range, both for Hato Field and for nearby Signal Corps learned more about siting
Camp Suffisant, Curagao, and for Dakota problems. On 2 August General Andrews
Field on the adjacent island of Aruba. Out complained that the inadequate supply of
in the Lesser Antilles island chain, Beane test equipment and spare parts still stood
Field on St. Lucia now rejoiced in two BC— near the top of his troubles with the AWS.
401's for air-ground and for point-to-point Even while the supply was improving, the
service, also in a radio range B-446. increasing number of radars operating day
Whether one flew along the coast or via and night imposed a demand that con-
the Antilles chain, the routes converged on tinued to outrun the supply.93
Trinidad. There, a number of AACS sta- While manpower became less and less a
tions now flourished. Waller Field had a problem, the tropical environment re-
BC-329 for airdrome control, a BC-401 mained hostile to electronic equipment and
for air-ground, a B-446 radio range. Fort to its operators alike. A field sanitary in-
Read had a BC-401 in operation and three spector looking over AWS radar stations in
more on order. Port of Spain had a BC-401 September found conditions ideal for dis-
serving the XXVI Fighter Command net
control station, and Edinburgh Field had 93
Ibid., p. 150. A technical report from the crew
two BC-329's on order, one to provide air- of the SCR-270 on Crown Mountain, St. Thomas,
drome control for each of its landing strips. dated 15 September 1942, gives an idea of the nor-
mal attention required by a big radar over a period
Next, farther along the ferry route toward of time:
Natal and Africa, came Atkinson Field, "At the very first running of this equipment, in
December, 1941, one element burned out, [was]
with a BC-401 for air-ground, a BC-642 cleaned, rewound, and burned out again. A fila-
for point-to-point, a B-446 radio range. ment transformer proved insufficiently insulated and
began arcing to ground. The pulse was stopped for
Farther on was Zandery Field, Surinam, as an hour on one occasion when a condenser shorted.
yet unequipped but awaiting two BC-401's As a result of insufficient lubrication and faulty
and a B-446.
92 alignment, the gear in the equipment for changing
direction failed, throwing the set off service for a
Radar stations now multiplied too. By the day. Roller bearings burned out. A day was lost
end of July, while three SCR-270's were when the bearings in one of the motors failed. High
leakage of current burned out several line fuses on
scheduled to go to Aruba and Curagao, the rectifier, a situation cleared by filing off some
four were already operating in the Puerto sharp edges and thoroughly cleaning everything;
the result was a clearer picture in the oscilloscope.
Rico area, as well as three 271's, one each Resistors burned out; another condenser shorted;
92
the circulating fan motor burned a coil. . . ." Ibid.,
Ibid., pp. 118-20. p. 154.
ACCUMULATING STRENGTH OVER THE WORLD 309
ease and fever. Drainage through the L. C. Marshall, also visited the Canal soon
puttylike, waterproof soil was impossible. after and worked out plans to send two
Round about were lagoons full of algae SCR-582's and an SCR-615 to the Canal
and croaking frogs, the larger pools rejoic- Zone, these being the first Signal Corps
ing also in crocodiles and caymans. The microwave radars put to use on the
96
Signal Corpsmen at the radars worked ground.
amid the raucous chorus of frogs, the bark
of crocodiles amid heat and disease, the Trinidad to Africa
heat could be lethal enough to knock and to the Middle East
a man out and yet the night so cool that
though wrapped in a wool blanket and America's right arm, with Signal Corps
shrouded by a mosquito netting canopy, one nerves and sense centers, punched right
would shiver all night through.94 through a succession of bases from the West
Panama became a testing ground for new Indies and Trinidad, on along the coast of
and newer radar, especially for such micro- Brazil, British Guiana, Surinam, to Natal,
wave sets as the SCR-615, which began to at the eastern tip of Brazil, on across the
get into the field in 1942. Dr. Bowles, of South Atlantic to Africa, by way of the
the Massachusetts Institute of Technology lone volcanic isle of Ascension in mid-ocean,
and Secretary of the Microwave Commit- a counterpart to Iceland in the North At-
tee of the National Defense Research Com- lantic. The small advance party of soldiers
mittee, having been recently appointed the of the Composite Task Force 8012, who
expert consultant for radar to the Secre- had been at work on the isle since early
tary of War, stimulated developments both spring of 1942, were completing initial in-
at home and on excursions into the field.95 stallations and running low on their rations
At Stimson's request Bowles and Ralph when the Steel Engineer arrived on 10 July,
Bown of the Bell Laboratories, the latter followed on 14 August by the James Parker,
also a member of the Microwave Commit- bringing enough men to complete the Army
tee, inspected Panama in June. They urged garrison. Aboard the Steel Engineer came
microwave ASV in place of the long-wave two SCR—271's, minus their towers and op-
equipment ASV-II, or SCR-521, then in erating buildings. Even so, the 692d Signal
use by patrol bombers. In particular, they Aircraft Warning Company improvised
urged microwave radars for the Aircraft and got both radars installed and operat-
Warning Service in order to provide low ing before the end of September. The Afri-
coverage against aircraft, something which can invasion, drawing imminent, now gave
the long-wave radars in Panama, both the tremendous importance to the Natal-
SCR-270 and 271 and the British CHL Ascension-Accra ferry route. The AACS
(SCR-588), could not adequately provide. radio station, WYUC—serving Wideawake
In consequence of Bowles' trip and recom- Field—its radio beacon and homing facili-
mendations, two more scientists from the ties, and its radiotelephone circuits, all la-
Radiation Laboratory, Dr. DuBridge and bored hugely as the weeks brought TORCH
nearer. November, the month of the inva-
94
Ibid., p. 156. 96
95
Dr. Henry E. Guerlac, Hist Div OSRD, Radar, (1) Ibid., pp. 994-95 (Sec C, Ch. I, pp. 12-
1945, pp. 991 ff (Sec E, Ch. I, 9 f f ) . 13). (2) See above, pp. 260-61.
310 THE SIGNAL CORPS
sion, would bring a sevenfold increase over the equipment, the frequencies, and call
September in the number of shuttling air- signs for an administrative net along the
craft which would pause on Ascension African ferry route to relieve the heavily
97
Island. loaded Pan American and AACS stations.99
In Africa itself the airway routes divided: Outstanding among the new ACAN sta-
northward to the Azores and the United tions would be the ones at Accra and
Kingdom; eastward to Egypt, the Middle Asmara, on the west and east coasts of
East, and India. The AACS, with the aid Africa, respectively. A 10-kilowatt trans-
of the Signal Corps, had, by October 1942, mitter had just arrived at Accra, General
set up Army airway stations at Roberts Olmstead learned early in October, and
Field in Liberia, at Accra on the Gold Coast, members of the 830th Signal Service Com-
at Lagos and Maiduguri in Nigeria, at Fort pany hoped to have it ready for service by
Lamy in French Equatorial Africa, at El November.100
Fasher and at Khartoum in the Anglo- Among the Signal Corps men who
Egyptian Sudan, at Cairo in Egypt, at Gura helped to put up the ACAN station at As-
(near Asmara) in Eritrea, and at Aden in mara, Eritrea, was Team Seven, 1 officer
Arabia. As of October nearly all the equip- and 20 enlisted men from among the
ment installed was commercial (much of it early comers to India. By July they had
had been taken over from previous Pan flown in from Karachi and set about their
American Airway stations in Africa). But labors. The antenna towers were already
more and more Signal Corps equipment was there, thanks to the Italians (Radio Ma-
arriving. For example, a quantity which the rina), and they were high—"reaching
Signal Corps shipped in October for these somewhere near the sun in the daytime and
stations included: 4 each BC-400's and the moon at night." Lacking the planned
446's, 9 BC-460's, 10 each BC-329's, SCR- 40-kilowatt transmitter, the men put to tem-
556's and SCR-551's, 1 each BC-339 and porary use a 300-watt set.101 Within a few
BC-340.98 weeks, as ACAN Station WVNT, they be-
These were AACS stations, equipped by gan working Karachi, some 2,000 miles to
the Signal Corps but operated by the Air the east, and then Accra, also about 2,000
Forces. Important ACAN stations were
99
going up in Africa too, essential links in the (1) OCSigO R&W Action 1, Col Lanahan, Asst
Dir of Planning, to WPD, 23 Jun 42, sub: Sig com
round-the-world equatorial belt of U. S. plan for a SOS African ferry route; (2) Memo,
Army communications. Before mid-year CSigO for Opns Div SOS, 24 Aug 42, sub: Addi-
tion of one 1-kilowatt team to 830th Sig Sv Co.
Signal Corps planners had decided upon SigC (EO) 4-5 Tables of Equip for the 830th Sig
SvCo.
97 100
(1) Memo, Gen Handy, ACofS USA, for CG Ltr, Lt Col Brooke Sawyer, Sig Officer Hq
AAF, 4 Jul 42, sub: Radar equip priorities; (2) USAF Central Africa, to CSigO, 5 Oct 42, sub:
Ltr, TAG to CG USAF in Ascension Island, 13 Pers and equip, 830th Sig Sv Co, inclosed with
Oct 42, sub: Instl of VHF in Ascension Island, with OCSigO R&W Action 1, Maj J. E. Walters, War
9 Incls. OPD 413.68 Ascension Island. (3) Hist Div Plans Br, to Maj Bagnall, Plant Div, 14 Oct 42,
WDSS, History of U. S. Army Forces, South At- same sub. SigC (EO) 4-5, No. 2 Tables of Equip
lantic, p. 258. OCMH. (4) See above, p. 108. for 830th Sig Sv Co.
98 101
Carbon copies entitled AACS Equipment at (1) Hawkins, History of the 835th Signal Serv-
13th, 18th and 19th Communications Regions, 25 ice Battalion, 1942-1946, p. 14. (2) Consolidated
May 43, unsigned and otherwise unidentified. SigC Signal Plan, USAF CBI (29 Sep-7 Oct 42), p. 25.
676.3 AACS. SigC ( C G ) 676, CBI Signal Plan.
ACCUMULATING STRENGTH OVER THE WORLD 311
miles away but to the west, across the ber in establishing a direct circuit, Cairo to
breadth of Africa. More men were needed Washington, WVNV-WAR. By this time,
and in September Company C of the 850th too, the men of the 830th in Accra were
Signal Service Battalion sailed from New making good their intent; the direct Accra-
York bound for Asmara by way of Suez. Washington radio channel was shaping up
Already two smaller groups of the 850th and on 9 November it went into operation,
had arrived in Asmara, a section of 1 officer WVNI-WAR, using high speed Boehme.102
and 13 men on 5 August, followed by a sec- Whereas before, the signals of Karachi could
ond section of 1 officer and 7 men on 14 get through to Washington, and vice versa,
September. only at certain favorable hours of operation
Team Seven was thus relieved, only to
receive at once an exotic assignment to Cairo 102
(1) Hawkins, History of the 835th Signal
where the men lived luxuriously in the patio Service Battalion, 1942-1946, p. 14. (2) Weekly
Digests—Traffic Division, Prog, Col French, 2 Sep
palace of an oriental prince while they in- 42, Item 1 A 6; 4 Nov 42, Items 1 A 5 and 7;
stalled an ACAN station in the Egyptian 11 Nov 42, Item 1 A 3. SigC 319.1 AC 133,
capital. With the one-kilowatt transmitter Drawer 483, Weekly Digest of Prog and Problems,
Rpts from Divs, 7-30-42—12-30-12. (3) Incl 2,
which the Plant Division had just sent over, Hist Data 3176th Sig Sv Co (formerly Co C 850th
Team Seven succeeded by the end of Octo- Sig Sv Bn) Asmara, Ch. I, pp. 1-2. OCMH.
312 THE SIGNAL CORPS
(the radio beams passing over the trouble- shipped in from America, a powerful 40-
some polar regions), now communications kilowatt multichannel radio. By mid-July
over the long distance, halfway around the it began regular operation directly with
world, became dependable at all hours, WAR,104 providing several telegraph chan-
passing through the favorable equatorial re- nels and one voice or telephoto channel,
gions by way of the stations at Accra and operating from an American Telephone and
Asmara, which served as relay points. Telegraph Company terminal in New York
Meanwhile, members of the 833d Signal to a General Post Office facility in England.
Service Company were at work in the Per- The big heavy-duty transmitter was essen-
sian Gulf Command, or the Iran-Iraq Serv- tial. In the event of its failure, the Signal
ice Command, activated 24 June 1942. Corps received access to a State Department
Two sections of the company arrived in the wire line, leased in June. It was a direct
command area in July. By 1 August they Western Union teleprinter duplex subma-
completed installing a radio station at rine cable circuit between Washington and
Basra, Iraq, and another at Andimeshk, the Embassy in London. The Washington
Iran. The former served as the net control Message Center made use of it, as and when
station, working Andimeshk on schedule State Department business permitted, by
and serving as a relay point for traffic des- means of an extension patched on in re-
tined for Karachi, for Cairo, and for sponse to bell code signals. Delays were not
Asmara.103 uncommon. Even so, the circuit proved an
invaluable facility, especially since it pro-
England: Signal Corps' Efforts vided an emergency channel for the highest
Looking Toward TORCH priority traffic.105
By mid-1942, as General Eisenhower
Beyond the Atlantic, in England itself, took charge of the European Theater of Op-
the Signal Corps had begun its overseas ef- erations, United States Army (ETOUSA),
fort during the defensive period even before which replaced USAFBI, American Army
Pearl Harbor, when it sent special observ- signal centers were multiplying. One served
ers, followed by officers of the Electronics the new Headquarters, Service of Supplies,
Training Group. The effort had steadily ETOUSA, at Cheltenham. Brig. Gen.
expanded during the first half of 1942 with William S. Rumbough, newly appointed
the arrival of Signal Corps units serving the as Chief Signal Officer, ETO, com-
United States Army Forces in the British manded both the Signal Section, ETOUSA,
Isles (USAFBI), and with the establish- and the Signal Service, SOS, ETOUSA.
ment of a signal center at 20 Grosvenor At Cheltenham the SOS signal center
Square. In July the Signal Corps men in- began with seven American officers, six
stalled their first large transmitter just
104
(1) Memo, Gen Stoner for Exec Control Div,
103
Capt Sidney L. Jackson, Communications in 22 Jul 42, sub: Prog Rpt, 16-22 Jul 42, Rpt 46,
the Persian Gulf Command: Chapter IV of the Item 1 a. SigC (AC) 319.1 Weekly Prog Rpts,
Theater Fixed Networks (1944), SigC historical Army Com Br, Dec 41-Jul 42. (2) See above pp.
monograph E-1d, pp. 5-6. SigC Hist Sec File. For 106, 223.
105
the continuation of the Caribbean-Middle East Reinstein, Signal Corps Fixed Communications
activity of the Signal Corps to mid-1943, see below, in the European and Africa-Middle Eastern Thea-
pp. 447ff. ters, pp. 18-19.
ACCUMULATING STRENGTH OVER THE WORLD 313
American enlisted men, and numbers of was the Selfridge Annex at Duke and Som-
British civilian and military men working erset Streets, a sizable steel and concrete
at a huge 17-position British switchboard. structure blessed with deep basements run-
Another new signal center in London ning 45 feet down. It was mid-December,
itself was one serving the central base section though, before the Signal Corps men could
headquarters, which began life modestly accomplish the move. Meanwhile, work be-
with a handful of men working the relatively gan on a second, auxiliary bombproof signal
limited wire facilities provided by a 4-posi- center on Goodge Street to be completed in
tion British switchboard. Still other smaller early 1943. Plans for TORCH were in full
signal centers began operation in the United swing by the end of August. The telephone
Kingdom during the last half of the year switchboard at the signal center of the
serving lesser SOS headquarters, as in Central Base Section expanded to ten
Northern Ireland and at the Western, the positions. And still more switchboards went
Eastern, and the Southern Base Sections.106 in, with more trunk lines, more cross-
When in August the Allied Force Head- connections, more of all the things that
quarters (AFHQ) for the invasion of North speed communication signals. The Ameri-
Africa began to take form and was lodged can signal center in London was now han-
in Norfolk House, in London, its communi- dling telephone calls alone to the number of
cations were kept closely tied to the signal 16,000 a day, and its teletypewriters, a
center at 20 Grosvenor Square by means of dozen Creed printers of British manufac-
two special simplex teleprinter circuits ture, pounded out over half a million words
linking the code rooms in the two build- during August.107
ings. From early summer until November Thus the American build-up in England
the signal center was involved in special steadily intensified during the summer, pre-
preparations for TORCH, creating or aug- paring for the invasion of Africa and for
menting communication links with far- the bombing of Germany. For if the Conti-
flung strategic points—Iceland at one ex-
107
treme, Algiers at the other. The vicinity of (1) History of Signal Center, Hq ETOUSA,
Grosvenor Square itself, however, was too Feb 42-Jan 44, cited n. 106(3). (2) Historical Rec-
ord, Construction of the Duke Street Signal Center.
exposed, too vulnerable to the dangers of Adm 578 DRB AGO. (3) Historical Record, Con-
bombing, to remain the communications struction of the Signal Center Operational Hq
center. In the summer of 1942, therefore, [Goodge Street]. Adm 580 DRB AGO. (4) Brig
Gen Francis H. Lanahan, Jr., "Build-up for Battle,"
the Americans asked the British to supply a Signals, I:1 (September-October, 1946), 17-21.
safer building, not too distant from the According to Lanahan, equipment used at the
London center for recording and relaying messages
original headquarters. Offered and accepted from a commercial terminal on the Embankment
was "ancient" and broke down under the heavy
106
(1) ETO Hist Div, Administrative and Logis- traffic from North Africa on the day of the invasion.
tical History of the European Theater of Opera- The frantic attentions of two expert mechanics
tions, Pt. I, The Predecessor Commands: SPOBS failed to restore it, and on this occasion technology
and USAFBI, pp. 207-11, 221. OCMH. (2) yielded to officer couriers who rushed back and
Reinstein, Signal Corps Fixed Communications in forth between the Embankment and 20 Grosvenor
the European and Africa-Middle Eastern Theaters, Square carrying copies of communiques from Al-
pp. 28-30. (3) History of Signal Center Hq giers. The next great invasion, into Normandy in
ETOUSA, Feb 42-Jan 44. SigC 314.7 History of 1944, required signal communications on a scale
Signal Center Hq ETOUSA Feb 42-Jan 42, Kan- twenty-five times as great as those demanded in 1942
sas City Records Center. for TORCH.
314 THE SIGNAL CORPS
nent could not be invaded immediately it Olmstead promised to do his best and in-
could be bombed. In this the British needed formed General Arnold on 1 August, "I
all possible American help, which General have advised my supply agencies that they
Spaatz, commander of the Eighth Air Force, are not to take any action to decrease the
was now readying. Just as Eighth Air Force amount of communication equipment to be
planes began participating in air raids, Gen- shipped to England below General Spaatz'
eral Olmstead arrived in the United King- requisitions unless I personally have ap-
dom to look over his installations. He talked proved such cut."108 On 4 July 1942 the
with Spaatz, who said he expected to lose Eighth Air Force committed its first bomb-
a good deal of equipment in his tactical ers, when six American craft joined an RAF
operations. He emphasized to Olmstead attack on targets in Holland.109
that he expected to get sufficient quantities
of communication material, an abundant 108
Memo, Olmstead for CG AAF, 1 Aug 42, sub:
unending flow of it, to keep full the com- Com material which will probably be requested for
munication stores of the Eighth Air Force, Gen Spaatz.
109
SigC (EO) 475 SigC Equip Gen.
Craven and Cate, The Army Air Forces, I,
despite the steady drain of combat losses. 658.
CHAPTER XI
percent of reception training center housing women, were becoming available. Some,
3
capacity. after training, would serve the Signal Corps
in civilian status. Others would don uni-
Sources of Signal Corps Manpower forms. As Waacs, for example, women
would take over many a Signal Corps man's
Some Signal Corps plans for getting men job, releasing him for field duty. Colonel
succeeded; others turned out badly. An ex- King, who remembered how effective
ample of the latter was Colonel King's plan women telephone units had been in France
to obtain some 2,000 additional officers and in World War I, advocated their use again.
6,800 specialists for installing and main- By October the Signal Corps had completed
taining radars through the Army Specialist its first surveys and had determined that
Corps. The first requisition was submitted there were at least 2,000 jobs in the Corps
in June, but three months later, only 10 that could be taken over by Waacs.6 As for
officers had been appointed, and only 40 civilian employment, the summer of 1942
specialists.4 The program suffered from saw the high tide. Late in August field em-
administrative confusion, no one being sure ployees numbered somewhat over 66,000,
whether the men were military or civilian with nearly 5,000 more in the Office of the
appointees, since they were subject both to Chief Signal Officer in Washington.7
Civil Service classification and to military The small but valuable reservoir of offi-
commissioning procedures. Part of the
cer manpower provided by the Affiliated
trouble lay with the appointees themselves.
Plan yielded a peak number of officers from
Of the few who received commissions be-
fore the Army Specialist Corps went into the telephone companies in July. In August
discard, some were poor officer material. the Signal Corps obtained permission to call
In October the Army Specialist Corps was in an additional 100 such officers, even
discontinued altogether.5 6
(1) CSigO, Annual Report, 1943, p. 310. (2)
But other considerable reservoirs of man- Memo, Gen Milliken for Exec Control Br, 29 May
power, of competent civilians both men and 42, sub: Weekly prog rpt, p. 5. Weekly Achieve-
ment Rpts, 27 Apr 42-8 Jun 42, SigC Central
3
(1) SOS Memo S615-3-42, 10 Sep 42; (2) Files. For a general discussion of the WAAC and
Memo, Div of Mil Pers SOS for TAG, 15 Dec 42, the WAC in the Signal Corps, see Mattie E. Tread-
sub: Excess illiterates at SOS RTCs. SPGAE/327 well, The Women's Army Corps, UNITED STATES
Gen (12-15-42)-40. SigC 353 RTC Gen 1, Jan- ARMY IN WORLD WAR II (Washington, 1954).
7
Aug 43. CSigO, Annual Report, 1943, pp. 394-95. On
4
(1) Memo, Actg CSigO for CG SOS, 6 Oct 42; 1 September the nine service commands were or-
(2) OCSigO R&W Action 1, Maj W. K. St. Clair ganized, and 30,000 civilians in the Signal service
for King, 3 Aug 42, and Action 2, King for Aux- at large lost their identity as Signal Corps em-
iliary Br, 3 Aug 42, sub: Army Specialist Corps. ployees, leaving approximately 36,000 civilian em-
SigC 210.1 Army Specialist Corps. ployees in the field, according to Signal Corps
5
(1) Logistics in World War II, Final Report of records.
the Army Service Forces, 1 July 1947 (Washing- The draft manuscript, Statistics, lists a total
ton, 1947), pp. 107, 111. (2) Tabs V and VI to of 51,503 civilian employees for the Signal Corps
Tab D, Incl to Memo, King for Deputy CSigO, 23 as of 30 June 1942, and 49,637 as of 30 September
Oct 42. sub: Pers rqmts. SigC 320.22 Enlisted 1942. It is believed that the exclusion of certain
Strength. MT-25. (3) Memo, Lt Col W. A. Rooks categories of employees in the statistical summaries
for Col Willis, 30 Nov 42, sub: Inspec, instruc- used and the inclusion of other categories in the
tion and emergency repair crews. SigC 353 Gen, Signal Corps figures account for the discrepancies.
Sep-Dec 42. (4) CSigO, Annual Report, 1943, For an explanation of statistical data used, see
p. 291. Statistics, pp. 40-42. OCMH.
PREPARING FOR THE FIRST MAJOR TEST 317
10
though they had not been included in the ing its task. Negroes in foreign theaters
1942 Troop Basis. It called them to active posed problems. Australia wanted none of
duty in the company officers' course at Fort them. They were not acceptable in China.
Monmouth, on the understanding that their In Africa itself the economic status of the
attendance would not interfere with the United States Negro bred discontent among
training of other officers required either for the native blacks. There were of course
units which the 1942 Troop Basis had set problems in the United States, too: segre-
up or for other units which had to be acti- gation in some states, and strong local preju-
vated within the year, though outside the dices in some areas, notably in the vicinity
troop basis.8 Some of the affiliated officers, of Camp Crowder, Missouri, where the
though technically very competent, were Negro construction units trained. At Fort
Monmouth the situation was quite different.
such poor students at the Signal Corps
The few Negro officer candidates who were
School that school officials wondered if they
in school there studied and lived among the
could qualify for commissions, until it was
white trainees and there was no race prob-
pointed out that these officers had been affil- lem.11 Negro troops were needed, regard-
iated for special construction work wherein less of the social problems they raised, and
they had developed ability from long expe- the troop program for Negro units provided
rience on the job. A man who had engaged for the activation of the 93d and 92d Divi-
in construction work, the Signal Corps rea- sion Signal Companies in May and October
soned, could not be expected or required to 1942, respectively, together with six more
possess the same education as an engineer. Negro construction companies to be acti-
Such men, like pigeoneers, could not be vated by August.
12
measured with the usual schoolmaster's The largest and most valuable group of
yardstick.9 trainees for the Signal Corps, generally des-
Negroes constituted another source of tined for service in uniform, was provided
manpower which the Signal Corps began 10
(1) Msgs, Andrews, Quarry Heights, to TAG,
to tap. The Signal Corps Troop Basis for No. 621, 8 Dec 41, and No. 761, 20 Dec 41; (2)
1942 included Negro units for the first time Memo, Eisenhower for WD Classified Msg Center,
since World War I, and the first such unit 27 Apr 42. OPD 370.5 (4-16-42) (3-4-42). (3)
Memo, Maj Gen Thomas T. Handy, ACofS OPD,
to be activated was the 275th Signal Con- for CG SOS and CG AGF, 26 Dec 42, sub: Move-
struction Company. Sent to Panama to ment of 275th Signal Construction Co. AG 370.5
10-8-41(1) Troop Movements to the Panama Ca-
build a pole line, it found itself unwelcome nal Dept (Mercury).
11
to the Panamanian Government and was (1) OCSigO R&W Action 1, Maj James S.
Vaughan for King, 6 Oct 42, sub: Conf on assign-
returned to the United States after complet- ment of Negro officers to units in 1943. SigC MP,
Confs, May-Nov 42. (2) Memo, Marshall for Gen
8
(1) Ltr, Col Lattin to Dir of Tng SOS, 7 Aug Bryden, 28 Oct 42, sub: OCS. AG 3 5 2 ( 1 ) Sec. 1
42, sub: Tng of affiliated SigC officers. SigC OCS. (3) Interv, SigC Hist Sec with King, 11 Oct
SPSMT-352 SCS Ft. Monmouth. (2) 1st Ind, Gen 49. SigC Hist Sec File. For a general discussion
Huebner, Dir of Tng SOS, to CSigO, n. d., with of the Negro in the U.S. Army, refer to Ulysses G.
basic. SigC SPTRS 352.11 SC (8-7-42). Lee, The Employment of Negro Troops, a forth-
9
OCSigO R&W Action 2, Lt Col Duncan coming volume in this series.
12
Hodges, Mil Pers Br, to Mil Tng Div, 30 Jan 43, Ltr, Chief of War Plans Div to All Brs,
sub: Affiliated officers. SigC 381 Affiliated Units OCSigO, 24 Jan 42, sub: Troop unit basis for mob
1, 1943. and tng, 1942. SigC 381 Gen.
318 THE SIGNAL CORPS
by the Enlisted Reserve Corps and the asso- men—and 1,000 were telephone repair-
14
ciated training program. The majority of men.
students under this plan were already half-
way into the Army as reservists, the Army Growth of Training Facilities
paying their expenses while they attended
civilian preservice schools in civilian dress. The rapid growth of Signal Corps train-
On 1 July 1942 more than 19,000 were en- ing facilities was barely keeping pace with
rolled in preservice training, as mechanic the increased flow of trainees. Congestion
learners, junior repairman trainees, junior and crowding at the replacement training
craftsman trainees, assistant technician centers were chronic. The capacity of the
trainees (preradar), and so on, at some 250 two centers at Fort Monmouth and Camp
vocational schools and colleges the country Crowder stood at about 20,000 men. A
over. By September's end some 30,000 were third replacement training center at Camp
on the rolls.13 Not all of them became re- Kohler, near Sacramento, would take care
servists. Some remained civilians and took of an additional 5,000 trainees, but it had
civilian posts in the Signal Corps or in in- been authorized only as a temporary expedi-
dustry producing for the Signal Corps. But ent. Under such circumstances, overcrowd-
by October so many of them were being ing was inevitable.15
called to active duty from a reserve status By autumn movement out of the con-
that they were jamming the Signal Corps gested Fort Monmouth area eased the sit-
replacement training centers. Added to the uation there somewhat. While Camp Edi-
men from other sources, they became more son and Camp Wood took part of the over-
than the large RTC's at Monmouth, Crow- flow, aircraft warning training moved out
der, and Kohler could absorb. For awhile, entirely to Camp Murphy, and in August
late in the year, there was a backlog of ERC all aircraft warning training at Monmouth
men awaiting induction while the RTC's ceased. Camp Wood still had the look of
struggled with the overload. Early in De- a muddy lumber camp when it opened offi-
cember the ERC program came to an end, cially on 14 July 1942. By autumn a full
with a presidential order closing the door to complement of barracks, mess halls, school
further enlistment of men between the ages buildings, and all the other necessary ap-
of 18 and 38. Those on the ERC rolls were purtenances of a full-fledged camp had ap-
permitted to finish. The Signal Corps esti- peared on the 275-acre tract. In October
mated that well over 50,000 technicians had the headquarters of the replacement train-
come to it through this productive program. 14
(1) OCSigO R&W Action 1, Civ Tng Br to
The great majority were radio and radar Control Div, 6 Nov 42, with Memo, Incl, Activi-
technicians. Only about 3,000 were radio ties of the Civilian Training Program, Signal Corps.
SigC ET-310. (2) Ingram, The Civilian Training
operators—that is, old style Morse code Program of the Signal Corps in World War II, I, p.
68, and II, Pre-Service Training on the College
13
(1) CSigO, Annual Report, 1943, pp. 398-400. Level (1945), SigC historical monograph C-3a,
(2) Marvin L. Ingram, The Civilian Training pp. 61-64.
15
Program of the Signal Corps in World War II: I, Capt Frederick Reinstein, Study of Signal Corps
Pre-Service Training on the Vocational Level Replacement and Filler Training 1941-1944
(1945), SigC historical monograph C-3, pp. 64-66. (1945), SigC historical monograph C-9, p. 77.
SigC Hist Sec File. SigC Hist Sec File.
PREPARING FOR THE FIRST MAJOR TEST 319
ing center also moved from Monmouth to steadily mounting. As matters stood, the
Wood. Pigeoneering departed in August, only hope of retaining Kohler in 1943 lay
going to Camp Crowder, and in October in converting it into a unit training center.
the Cryptographic Division moved to a rural Therefore plans for such a center, with a
site, secret and safe, in the foothills of the capacity of 5,700, went forward concur-
Blue Ridge near Warrenton, Virginia. rently with plans for Kohler's use as the
17
There remained at Monmouth proper only third of the replacement centers.
the Signal Corps School, with its enlisted, The first unit training center had been
officer, officer candidate, and training lit- established at Crowder in August. Crowder
erature departments. Yet for every special- was growing fast. By September some 2,100
ized subject no longer taught at Monmouth, officers and men were developing teamwork
a new one appeared. For example, there in the unit training center, while more than
were the new VHF techniques which vitally 13,000 men were being trained in the RTC
18
concerned air-ground communications and and another 6,000 specialists in the school.
radio relay, soon to play a significant role To administer and supervise this growing
in North Africa. In August Signal Corps complex of virtually separate training activi-
instructors at Fort Monmouth began teach- ties, the Services of Supply on 17 September
ing VHF courses to classes that crammed approved the organization of a new head-
the rooms, with enrollment continually quarters, the Central Signal Corps Training
larger than authorized.16 Center, thereby establishing a pattern
Meanwhile, the Signal Corps had been which was soon followed at Monmouth,
unable to meet the target date of 1 August where the Eastern Signal Corps Training
19
for opening its third replacement training Center was established on 9 October.
center at Camp Kohler, California. Acti- While the facilities for mass training of
vated a month later, on 1 September, this Signal Corps soldiers spread out in every
center became an exempt installation under direction, the highly specialized radar train-
the command of Brig. Gen. Stephen H. ing at Camp Murphy, Florida, likewise
Sherrill, the post remaining under the juris- flourished. Colonel Mitchell and his staff of
diction of the Ninth Service Command. instructors overhauled the courses, adding
Cadres of officers and enlisted men came new ones from time to time during the late
from Fort Monmouth and Camp Crowder. summer and early autumn. As elsewhere
The first 481 recruits arrived on 19 Septem- throughout the Signal Corps' school activ-
ber; basic training began two days later. By ity late in 1942, emphasis was shifting from
the first of October there were 3,000 the training of individual specialists to
trainees, more than 50 percent above the group, or unit, training of electronic teams.
capacity originally authorized. Having ac-
quired Camp Kohler, the Signal Corps had 17
(1) Reinstein, Study of Signal Corps Replace-
no wish to give up the site at the end of the ment and Filler Training 1941-44, pp. 118-19. (2)
Memo, Col William C. Bennett, Jr., Tng Div SOS,
year, with the needs for trained signalmen for Dir of Tng, 14 Nov 42, with 1st Ind, Huebner
to CSigO, 17 Nov 42. SigC SPSMT 353 Walerga.
16 18
(1) CSigO, Annual Report, 1943, pp. 11, 346. (1) CSigO, Annual Report, 1943, pp. 375-86.
(2) Ltr, King to Dir of Cryptographic Div ESCS, (2) Organization Chart, Camp Crowder, 1 Sep
Vint Hill Farms Station, Warrenton, Va., 3 Nov 42, 42. SigC SPSMP 4.
19
sub: Cryptographic School. SigC MP 352 Schools Reinstein, Study of Signal Corps Replacement
1942. and Filler Training 1941-44, pp. 29, 77-78.
320 THE SIGNAL CORPS
Thus at Murphy a team-training depart- Gen. George S. Patton, Jr., for the Desert
ment opened before the year's end, instruct- Training Center had called for a repair shop
ing as co-ordinated teams all the various for signal equipment, a post signal officer, a
specialists who operate a radar station. Ra- signal property officer, and a service com-
dar maintenance men, engine maintenance pany detachment to operate post signal ac-
men, rigger-electricians all had to learn how tivities, in addition to the signal units with
to work together, and also had to learn such troops. With overseas needs for Signal Corps
things as camouflage, chemical warfare de- men remaining unfilled, it is understandable
fense, first aid, laying field wire, pitching that he got less than he asked for. Signal
tents. They had to be specialists to perform Corps troops were in exceedingly short sup-
their highly technical duties. But they had ply in the Desert Training Center. The local
to be soldiers, too, able to live, fight, and telephone company provided communica-
survive in the field.20 Radar men very often tions service for the area to a point, and be-
would serve under extraordinary conditions yond that, the much-under-strength 60th
in every sort of climate and in every sort of Signal Company of the IX Corps carried on.
situation. Their assignments placed them in The exercises also rapidly consumed sig-
positions of great individual responsibility nal equipment, likewise in short supply. Al-
and trust. "When you're over there fighting though the Signal Corps men involved were
and want to catch some sleep, you know too few to provide any appreciable reservoir
someone is watching over you and you'll be of men experienced in desert training, Gen-
warned if enemy bombers start zooming in." eral Van Deusen, Commandant, Eastern
That was how a sergeant in an aircraft warn- Signal Corps Training Center, Fort Mon-
ing unit put it—a unit which survived a mouth, was gratified to note that the com-
savage Japanese attack in Milne Bay, then manders of the major units engaged in the
landed at Oro Bay near Buna and pushed training displayed a fuller appreciation of
fifteen miles through the jungle to set up the the necessity for proper radio training than
radar sets which helped to provide informa- had been evidenced in the past.22
tion concerning the Japanese convoy later Where motorized and armored units de-
sunk in the Bismarck Sea.21 ployed at distances of 50 miles and more in
Meanwhile, in the Indio-Needles area of the soft, smothering sand, commanders and
California and Arizona, where the Army staff officers came to depend more and more
Ground Forces' Desert Training Center had upon radio voice communication. Indeed,
been established, such signal troops as could some Signal Corps observers at the maneu-
be spared were receiving desert training un- vers in the desert training area in October
der simulated theater conditions—training reported that the Armored Force was rely-
which would be invaluable in the campaign ing too much on radio communication, and
in North Africa. From the beginning, the overlooking the value of visual and messen-
role of the Signal Corps in that training ger communication in many situations. A
project was a difficult one. The plans of Maj. pigeon detachment had been assigned to the
20
CSigO, Annual Report, 1943, pp. 328-32. Desert Training Center to determine
21
T/Sgt George W. Cates, Historical Rpt of Air-
22
craft Warning Unit Training Center, App., Air- Ltr, CG ESCTC to CSigO, 16 Oct 42, sub:
craft Warning Does the Job, p. 18. SigC Hist Sec Rpt of duty as observer, Desert Training Force.
File. SigC EC 354.2 Maneuvers 1942.
PREPARING FOR THE FIRST MAJOR TEST 321
whether communication by that means of supplying and training soldier specialists,
would be practicable in warfare in North though the Army's demands continued to
Africa.23 keep somewhat ahead of output. By mid-
Gradually support was building up for October, the several RTC's had turned out
the Signal Corps point of view that the 25,000 specialists and had assigned them
26
complexity and extreme importance of to units. The combined capacity at Mon-
communications demanded men of superior mouth, Crowder, and Kohler stood at
qualifications for communications training. 46,970, and would soon exceed 50,000.
It was a point of view which, in the later The Signal Corps enlisted strength stood at
years of the war when the value of elec- about 143,000. Military Personnel Branch
tronics in warfare had won wide recogni- estimated that the Signal Corps would be
tion, brought a high percentage of AGCT able to supply about 80 percent of the
Class I and Class II men to the Signal numbers needed to meet such requirements
Corps.24 In late 1942, however, other serv- as had been stated on paper for the period
ices, particularly the Navy, the Marine ending 31 December 1942. The Army Air
Corps, and the Army Air Forces, were still Forces requirements could not be known
skimming the cream of the manpower avail- for certain until the War Department Gen-
able. For example, General Somervell in eral Staff released an approved troop basis
September 1942 vigorously protested a War for air units. So far it had released none,
Department directive which aimed at chan- either for the current year or for 1943, but
neling into the Air Forces for a number of the AAF estimated informally that its re-
months 50,000 of the men who scored 100 quirements would total 118,000 by the end
or better in both the Army General Classi- of the year. At the end of October, Colonel
fication Test and the Mechanical Aptitude King lamented, "I still don't know what the
Test. Somervell argued that the ruling requirements are, if any." 27
handicapped the procurement and devel- The lack of firm requirements made
opment of combat leaders for all the Serv- planning very difficult. Even when ap-
ices of Supply.25 proved troop basis figures were available,
All things considered, the Signal Corps experience showed that the specialists actu-
ally needed usually ran about 15 percent
was now doing rather well in the business
above the paper requirements. Also, when
23
A History of the 280th Signal Pigeon Com-
requirements became known, too often the
pany, 1941-1944, Ch. VII. SigC Hist Sec File.
24 26
In 1943 the percentage of Class I and Class II (1) Weekly Prog Rpt, Opns Br, 22 Oct 42,
men received at Signal Corps RTC's was 58 per- 1942 History of Operations Branch. (2) Tab C to
cent, highest for any branch of the service, but in Memo, Chief of Mil Pers Br for Deputy CSigO,
the period March-August 1942, it was only 39.2 23 Oct 42, sub: Pers rqmts. SigC 320.22 Enlisted
percent, behind Finance, Chemical Warfare Serv- Strength Oct 42, MT-25.
27
ice, AAF, and Ordnance. Palmer, Wiley, and Keast, (1) Memo, cited n. 2 6 ( 2 ) . (2) Info for SOS
The Procurement and Training of Ground Combat Staff Conf, 27 Oct 42. SigC SPSTP 6. (3) OCSigO
Troops, pp. 17-18. R&W Action 14, Chief of Mil Pers Br to Sig
25
(1) Tab III, Tab D, Incl to Memo, Chief of Supply Sv, 31 Oct 42, sub: Spec tng for SigC
Mil Pers Br for Deputy CSigO, 23 Oct 42, sub: specs. SigC 353 Gen Sep-Dec 42, MT-41. (4)
Pers rqmts. SigC 320.22 Enlisted Strength Oct 42, Memo, Chief of Mil Pers Br OCSigO for Prog and
MT-25. (2) Palmer, Wiley, and Keast, The Pro- Statistics Br, 22 Oct 42, sub: Weekly digest of
curement and Training of Ground Combat Troops, prog and problems, 15-21 Oct 42. Digest of Prog,
pp. 24-25. 23 Sep-21 Oct 42. SigC Central Files.
264-211 O - 78 - 23
322 THE SIGNAL CORPS
requests for the men followed at once, no guesswork. Even then, the normal period of
account being taken of the time needed to time between the date that a production
train specialists. The Signal Corps met the contract was let and the date that equip-
Army's needs by such ruses as supplying ment could be expected to come off the pro-
partly trained men, pulling them out of duction line varied enormously, according
classes two weeks short of graduation. The to the type of items required. Three months
General Staff had authorized King to do might suffice for a very simple piece of
this, on the sound theory that partially equipment, assuming that the factory was
trained men are better than men with no tooled up, with all the materials at hand,
training at all. Yet the courses had already and a trained labor force ready. A radio set
been shortened to the limits of efficiency, might take a year, a radar set several years,
and further curtailment thrust men into assuming that all development was com-
service before they were ready for it. Such plete. But what if there were not enough
wastage, no doubt inevitable in the turmoil factories, or materials, or laborers? And
of war, was to hamper the efficiency of Sig- what if changing tactical decisions forced
nal Corps units in the oncoming offensive. design changes in equipment in order to
incorporate newly discovered research ideas?
Problems of Procurement All these things greatly affected the progress
of Signal Corps procurement.
Of three big fields of Signal Corps Even admitting that the problems of pro-
activity—training, procurement, and plan- duction could not be expected to yield to
ning—it was procurement which lagged in solution quickly, the Signal Corps produc-
late 1942. Partly this was the result of the tive efforts still had to be rated as less than
fact that the Army did not control the satisfactory in the late summer months of
civilian economy in the same direct and tell- 1942. "The Signal Corps is further behind
ing way that it controlled the assimilation of in meeting its objectives than the other serv-
men into service, or the channeling of re- ices," so General Colton wrote to the officers
search into directed areas. Partly, produc- in charge of all branches of his Signal Sup-
tion fell behind because of the sheer weight ply Service on 21 August. The day before,
and complexity of the manifold problems the harried head of Signal Supply had at-
involved in converting industry to all-out tended a meeting in the Procurement
war effort. The Signal Corps felt the pres- Branch, Services of Supply, presided over by
sure, albeit many times removed, from Maj. Gen. William H. Harrison. If produc-
numerous powerful federal wartime pro-
tion statistics and objectives were to coin-
duction and manpower agencies.
cide, then Signal Corps deliveries for the
Most of all, production lagged because it
had to wait upon basic tactical decisions. remaining months of the year would have
Tables of equipment and tables of basic to double and triple the July rate: "two and
allowances determined what kinds of items one-half to two and three-quarters times,"
would be needed by the Army, and in what Colton said, as he asked his officers to report
28
amounts. Until the number of men to be upon prospective future deliveries.
outfitted was agreed upon, and the areas in 28
Memo, Colton for O/Cs All Brs of Sig Supply
which the men were to serve were decided, Sv, 21 Aug 42. SigC 319.1 Rpts, Gen 2, Sep-Nov
calculations of equipment needs were largely 42 (RB-1541).
PREPARING FOR THE FIRST MAJOR TEST 323
Increasing Complexity of the In the field, meanwhile, Signal Corps
Supply Organization agencies multiplied, with every month
bringing at least one decentralization of
The pattern of supply had grown more functions. In October 1942 the Storage and
intricate. While its responsibilities increased, Issue Branch of the Office of the Chief Sig-
the Signal Corps had less freedom of direct nal Officer moved to Philadelphia and
action under the Services of Supply, which became the Storage and Issue Agency, with
acted at a supervisory level. The situation only a liaison branch remaining in the Pen-
was much like that within the Signal Corps, tagon. In the same month the Signal Corps
wherein the Chief Signal Officer had inter- Inspection Agency set up housekeeping at
posed several echelons between himself and Dayton. In November a new procurement
his operating divisions. Throughout the
district started operating at Monmouth,
summer, General Olmstead had continued
handling procurement functions formerly
to reorganize his office. As new functions
came into being or old ones assumed less or carried out by the Signal Corps General De-
greater importance, he created new organi- velopment Laboratories at Fort Monmouth
zational units, killed old ones, or shuffled and the Signal Corps Radar Laboratory at
them around, seeking always to achieve a Belmar, New Jersey. December brought the
stronger and more complete decentraliza- creation of a new superagency, the Signal
tion.29 Each shift within the Office of the Corps Ground Signal Service, which would
Chief Signal Officer brought a correspond- supervise the activities of the supply and de-
ing change in the field organization, in swift velopment agencies in the Fort Monmouth
chronological succession. area much as the Signal Corps Aircraft Sig-
At the end of the summer in 1942 the nal Service supervised those in the Dayton
Supply Service under General Colton at area.32
last clearly reflected what Colton's dual Dayton was the center of Signal Corps
responsibilities had been for months; his procurement for the Army Air Forces, which
two divisions were now labeled simply now used more radio and radar equip-
"Materiel" and "Research and Develop-
ment than all the rest of the Army put to-
ment." 30 The personnel of the Materiel Di-
gether.33 The activities of the Wright Field
vision branches—Scheduling, Facilities and
Signal Corps Procurement District and the
Materials, Storage and Issue—brought the
Dayton Signal Depot were associated, the
total manpower of this half of Colton's
depot having had its genesis in the storage
realm to 207 officers and 2,856 civilians,
and issue section of the procurement dis-
more than one half of all the civilians in the
trict. The two agencies could hardly be said
Office of the Chief Signal Officer.31
to be housed in the same building, for by
29
Dr. Courtney R. Hall, Development of the October 1942 their offices and warehouses
Office of the Chief Signal Officer (1944), SigC
historical monograph D-l, p. 152. SigC Hist Sec were scattered about the city in twenty-one
File.
30 32
(1) See above, pp. 58-62. (2) Signal Corps Ibid., pp. 55ff.
33
Administrative Log, 1939-1945, OCSigO Orgn. Andre E. Gerard, The Story of Supply in the
Charts No. 18, 30 Sep 42, No. 19, 14 Dec 42. SigC Signal Corps in World War II, Pt. II, Procurement
Hist Sec File. (1945), SigC historical monograph B-1b, p. 13.
31
CSigO, Annual Report 1943, p. 395. SigC Hist Sec File.
324 THE SIGNAL CORPS
buildings, mostly former garage and auto- the plan was approved. By October the
34
mobile salesroom buildings. necessary shifting of personnel and func-
In the earlier part of the summer there tions had been accomplished, and the new
had been a desperate shortage of officers, Signal Corps Inspection Agency was in-
with only fifty assigned to both agencies, stalled in its quarters at Dayton. Col. Lester
and the depot alone needing that many.35 J. Harris, formerly in charge of the now de-
Personnel matters had improved by early activated San Francisco Signal Corps Pro-
fall. The volume of work was growing curement District, headed the new activity.
steadily. The Meteorological Division ac- Five inspection zone offices, at Newark,
tivities alone were expected to increase 100 Philadelphia, Dayton, Chicago, and San
percent within a few months. When the Francisco, reported to the agency, and there
meteorological equipment was moved to was a liaison headquarters section in the
Dayton from Philadelphia in midsummer Office of the Chief Signal Officer.36
1942 officers tried to fit it into the 30,000
square feet in the Ripley Building, but had The Spare Parts Problem
to ask for an additional 6,500 square feet of
floor space in the Shroyer Building, a block Meanwhile, the decision to invade North
farther up North Main Street. By Novem- Africa late in 1942 brought new urgency to
ber, with employees working as long as six- a problem which had harassed the Signal
teen hours a day seven days a week on two Corps since the moment war began. This
shifts, supply functions were in good shape. was the matter of providing enough spare
The Signal Corps inspection service had parts, particularly radar parts. The basic
been operating in a twilight zone of respon- reason for the existence of this problem lay
sibility all summer, awaiting the results of in the initial lack of industrial capacity to
the inspection study being made by General cope with the tremendous volume of pro-
Olmstead's trouble shooter, George L. duction demanded by global war. It was
Schnable. His fact-finding tour completed, aggravated both by the concentration upon
Schnable had presented a plan which di- end item production to the neglect of spare
vided the country into zones, each office parts and by the lack of a unified control in
37
any Signal Corps agency. The responsi-
reporting to a central control agency, which
bility for spare parts cut across the areas of
would take over all inspection previously
development, planning, requirements, pro-
handled by the Philadelphia Signal Corps
curement, production, storage and issue,
Procurement District and its field offices and and distribution. At one time or another,
by the various laboratories. In September numerous Signal Corps agencies in all those
34 36
History of the Dayton Signal Supply Agency, (1) History of the Signal Corps Inspection
Chronology. SigC 314.7 History of the Procure- Agency, 5 October 1942 to 2 September 1945, pp.
ment District, USAF Mat Comd Central Files, 10-21. SigC Hist Sec File. (2) Ltr, Dir of SigC
Wright-Patterson Air Forces Base, Dayton, Ohio. Supply Sv, to CG Phila SC Proc Dist et al, 4 Sep
In August 1943 the association was legalized as the 42, sub: Establishing of the SigC Inspec Agency.
Dayton Signal Corps Procurement District and SigC 400.163 Inspec 6, Sep 42. (3) Memo, Col
Depot. Ibid. George I. Back, Exec Officer Sig Supply Sv, for
35
Ltr, Lt Col John M. Rae, IGD, to Inspector Control Div OCSigO, 6 Nov 42. Digest of Prog,
Gen, 20 Jul 42, sub: Annual inspec of Wright 28 Oct 42-18 Nov 42. SigC Central Files.
37
Fld SigC Proc Dist. SigC EO 333.1, Inspecs at Gerard, Story of Supply in the Signal Corps,
Wright Field, 1942. Pt. II, p. 58.
PREPARING FOR THE FIRST MAJOR TEST 325
fields busied themselves with the matter.38 Furthermore, until field experience fur-
The Services of Supply was also much con- nished better answers, the computation of
cerned about spare parts, not only for Sig- spare parts required for maintenance and
nal Corps items of equipment, but also for repair was largely guesswork.
equipment of all the technical services. On the procurement side, contracting of-
Spare parts possessed a dual function, ficers could not be expected to order spare
being used both for maintenance and for parts if they had no idea what to buy, or
repair. Usually, the laboratory which was in what amounts. Although by autumn all
responsible for development of an item new contracts contained clauses providing
of equipment made up parts lists and cal- for concurrent delivery of spare parts and
culated the amount of spare parts necessary end items, delivery still could not be as-
for a year's supply. The contracting officers sured. Unfortunately, spare parts were
were supposed to include that amount in nearly always components of end items on
the initial contract. These two points were the contract, and the pressure to get out
basic. Obviously, without knowing what quantities of end items was heavy and un-
parts went into a set, it was impossible to remitting. Rather than interfere with pro-
buy spare parts for it. The laboratories, un- duction lines, manufacturers often asked
derstaffed and overworked, were very slow for, and got, waivers on the required spare
about getting the lists compiled. As late as parts groups. The result was that increas-
May 1942 the maintenance requirements ing amounts of equipment did go out into
for some items were based on 1939 lists.39 the field, but, lacking spare parts, soon be-
As late as October the Research and De- came immobilized. The question was
velopment Division of the Office of the whether it was better to equip initially as
Chief Signal Officer was pointing out to the many troops as possible with the items listed
Signal Corps Radar Laboratory that the in the tables of basic allowances, and let
most complete radar parts list which it had
them use their equipment as long as pos-
furnished until then was in fact far from
sible without enough maintenance, or to
complete. Issued in March for the SCR-
270 and 271, it omitted 33 capacitors, 7 equip fewer troops, but give them adequate
resistors, and 3 coils that were actually numbers of spare parts to prolong the work-
used. The laboratory promised quick action, ing life of the equipment. It was not a mat-
but as a matter of fact did not finish the ter for the Signal Corps to decide, since the
first complete parts list for the SCR-270 official Army policy, enunciated by the War
and 271 until March 1943. Other vital lists Department early in 1941, required the
did not appear until May and June.40 immediate issue of equipment without wait-
38
(1) Ibid., p. 26. (2) Wallace Clark Rpt 25, 15 ing for spare parts. The problem was ag-
Mar 43. SigC 413.44 Spare Parts 5, Jun-Jul 43. gravated by the fact that troop activations
39
Memo, K. C. Dolliner to Col Heath, 16 May were hasty, unorganized, and unpredict-
42. SigC 413.44 Spare Parts 1, 1941-May 1942.
40
(1) Ltr, Exec Officer R&D Div OCSigO to able. Provisional units sprang into being,
Dir of SCRL, 26 Oct 42, sub: Complete parts lists and depots were stripped of supplies to
for ground radar equip, and 5th Ind, O/C Applied
Engr SCRL to CSigO, 4 Mar 43. SigC 413.44 Spare
equip them.41
Parts 3, Sep-Nov 42. (2) Ltr, O/C Equip Coord
41
Br to CSigO, 4 Jun 43, sub: Parts lists. SigC 413.44 Gerard, Story of Supply in the Signal Corps,
SCR-270-12H No. 18 (RB-2013). Pt. II, pp. 28-29.
326 THE SIGNAL CORPS
Radar spares were especially critical. Puerto Rico, the various interceptor com-
When war came there existed no radar in- mands, and other danger points. While
dustry as such. Radar was a completely new these priority shipments were being made,
field; there were no experience tables on floods of direct requisitions from using or-
which to base life expectancy and mainte- ganizations poured in. The Signal Corps
nance requirement lists. Even the designs sent whatever it could, but usually it did
were not fixed. Each day brought new tacti- not have all of the items required to make
cal applications, fresh demands from the up a complete depot spare parts set, almost
using services. And as the potentialities of certainly not in the quantities designated. At
the wonder weapon began to be revealed in once Storage and Issue initiated a $5,200,-
the trial of battle, the clamor for more and 000 purchase request to provide spare parts
more sets of new and improved design quite for 500 SCR-268's for one year. During the
drowned out the pleas for spare parts to next month it wrote up three more requests
maintain the sets already in the field. totaling $7,398,000 for spare parts for the
Spare parts for the SCR-268, 270, and 271 SCR-270, and for massive quantities of
comprised three separate classes: first, com- tubes for both radars. But three months
plete component sets; second, depot spare later, at the end of March 1942, purchasing
parts, which were certain individual items officers had not yet been able to place all
thought to be most needed, and listed on of the orders; no substantial deliveries could
spare parts lists; and finally, spare parts be expected at least until May, and "the
furnished with each operating set. The basis situation in regard to depot spare parts
of issue for spare parts, one set for every [was] critical." 44
twenty-five radars, had been established for The search for radar parts turned next to
peacetime operation, which contemplated the corps areas, merely to be frustrated.
not more than six hours of operation per Only the First Corps Area at Boston had
day. On a wartime basis, demanding at any complete parts sets, six for the SCR-
least eighteen hours of operation each day, 268 and four for the 270. The others
one spare parts set for each five operating reported none at all, or groups in varying
units would be needed.42 degrees of incompleteness.45 But most of the
When war began, the Signal Corps had parts needed were of commercial design;
on hand in its depots only 12 spare SCR- perhaps the corps area signal officers could
268 sets, and 23 SCR-270 and 27l's, to- find them on local radio dealers' shelves.
gether with 18 depot spare parts for the 268, Throughout the summer, the corps areas,
and one each for the 270 and 271.43 During or as they were now being called, the serv-
the first frantic weeks of war, the Storage ice commands, bought on the open market
and Issue Division distributed the 268's and such repair parts as they could find. The
two of the 270's as spares to the points of results were disappointing, but not unex-
highest priority: to Hawaii, Panama,
44
OCSigO R&W Action 3, S&I Div to Maint
42
OCSigO R&W Action 1, J. C. Davenport to Div, 25 Mar 42, sub: Spare parts for SCR-268,
Maj Maude, 24 Dec 41, sub: Spare Parts for 270, and 271 sets. SigC 413.44 Spare Parts 1, 1941-
SCR-268, SCR-270, and SCR-271. SigC 156 Spare May 1942.
45
Parts (RB-946). Msg, CSigO to Sig Officers All Corps Areas, 1
43
Memo, Col Meade for CSigO, 15 Dec 41, sub: May 42, and replies. SigC 413.44 Spare Parts 1,
Immediate detector maint problem. File cited n. 42. 1941-May 1942.
PREPARING FOR THE FIRST MAJOR TEST 327
pectedly so, since several parts sought could not available on store shelves, the mobile
not be identified from the parts lists, and at crews had sought out small manufacturers,
least one part was of special design and who could not make the complicated radars
could be secured only through a depot. but who could make parts.49 By the end of
Any expedient which might yield results October the emergency mobile procurement
in the frantic search for radar parts was program had brought in $1,614,891 worth
tried at least once. When General Electric's of parts.50 By then Westinghouse and other
$1,000,000 contract for aircraft transmit- large concerns were shipping quantities of
ters was canceled, the company shipped radar spares on the first large spare parts
several carloads of fabricated and unfabri- orders.
cated parts to the Lexington Signal Depot. Yet the stock situation at the Lexington
The Office of the Chief Signal Officer sent Signal Depot remained "very bad"; the
down two experts to sort out the material, Maintenance Branch felt that "hoarding
select as much of it as was suitable for radar had been going on," and sent a man to
parts, and ship the rest out to repair shops.46 make a spot check at some of the repair
Other experts searched the Philadelphia shops in the service commands to find out.51
Signal Corps Depot general stock to see The "considerable gap between the quan-
what portion of it could be used for radar tity of material shipped from the labora-
47
parts, but found very little. tories and depots and that received by the
The most rewarding effort resulted from overseas bases" prompted Colonel Rives,
formation of mobile procurement crews, chief of the Radar Division in the Office of
three-man teams from the Signal Corps
the Chief Signal Officer, to send a three-
Radar Laboratory. They toured the east-
man crew to the west coast to inspect serv-
ern seaboard searching out radio equip-
ment stores and buying up quantities of ice commands, ports of embarkation, and
resistors and potentiometers, capacitors, the headquarters of the Alaska Communi-
transformers, tubes, switches, solder, and cation System to try to find out what was
miscellaneous equipment. By July these wrong with the distribution system of radar
roving teams had obtained practically all maintenance and spare parts.52
of the most critical items for the mainte- 49
nance of 1,000 SCR-268's, 500 SCR-270's, OCSigO R&W Action 1, Lt J. C. Hansen to
Reardon, 3 Jul 42, sub: Critical parts for SCR-
and 100 SCR-271's.48 For spare parts items 268, 270, and 271 not obtainable on the open mar-
ket. SigC 413.44 Spare Parts 2, Jun-Aug 42.
46 50
(1) Memo, O. B. Anderson for Maj Reardon, Incl 2, Exhibit B, Summary of Completed and
21 May 42; (2) OCSigO R&W Action 1, Capt Outstanding Contracts Emergency Mobile Procure-
H. L. Halterman to Maj Watson, Maint. Br, 20 ment as of October 15, 1942, and Ltr, O/C Mobile
May 42, sub: Spare parts. SigC 413.44 Spare Parts Proc to CSigO, 2 Nov 42, sub: Proc of spare parts
1, 1941-May 1942. SCR-268, 270, 271. SigC 413.44 Spare Parts 3,
47
OCSigO R&W Action 1, Instl and Maint Div Sep-Nov 42.
51
to Radar Div, 15 Jun 42, sub: Availability of spare OCSigO R&W Action 1, Maj Arthur Soper to
parts at Philadelphia Sig Depot bearing other than O/C, 12 Aug 42, sub: Ground radar maint. SigC
radar numbers which might be used as substitutions 413.44 Spare Parts 2, Jun-Aug 42.
52
for like parts in radar equip. SigC 413.44 Spare Ltr, Chief of Radar Div OCSigO to Port
Parts 2, Jun-Aug 42. Comdr Seattle POE, O/C Alaska Com System, and
48
Memo, [O/C Mobile Crews] for Col Reardon, CG Ninth Sv Comd, 5 Oct 42, sub: Distr study of
3 Jul 42, sub: Summary of activities of emergency radar spare parts for shipment to overseas bases.
spare parts proc crews. SigC 230 Gen. SigC 413.44 Spare Parts 2, Jun-Aug 42.
328 THE SIGNAL CORPS
Thus throughout the year the Signal Nevertheless, they doubted the wisdom of
Corps hacked away energetically at the the Signal Corps plan to subcontract a fixed
spare parts problem. But the effort was scat- percentage of all contracts, and the presi-
tered, a bit here and a bit there, so that the dent of Western Electric had suggested that
problem was dented but not reduced to there were technical reasons why subcon-
manageable size. The basic difficulties un- tracting had to be handled with care. Not
derlying it remained. Not all of them were all contracting officers were in accord with
within the Signal Corps' power to solve, but the idea of subcontracting, either. They
the Corps would be blamed for them none- were under tremendous pressure to get out
theless. There would be many a complaint equipment and to get it out fast, and sub-
from North Africa because of the lack of contracting meant trusting untried, possibly
spare parts for signal equipment.53 less skilled, sources. Yet the War Depart-
ment policy was to broaden the base of
Spreading Procurement procurement. Though obviously unable to
to Small Business apply a rule of thumb, Signal Corps pro-
curement officers in general tried conscien-
Of the many policy matters affecting Sig- tiously to develop secondary sources of sup-
nal Corps production in the latter half of ply and to enforce the subcontracting
1942, not the least was the question of provisions.
spreading the work to smaller business con- Early in February 1942 the Control Divi-
cerns. The Signal Corps, both by choice sion had warned supply officers that even
and by necessity, had placed its supply prob- if all prime contracts with the nine largest
lems largely in the hands of the five giants firms supplying Signal Corps equipment
of the industry. But there was a persistent were 30 percent subcontracted, Bendix
feeling of uneasiness among Signal Corps would still need five years to complete its
supply officers that the concentration of undelivered load, General Electric almost
awards among the very large companies one and a half years, and Westinghouse
54
might result in overburdening them to such two and a half years. In August an officer
an extent that they could not deliver the from Colton's Aircraft Radar Branch wrote
material on time. that overloading of the big companies had
It was true that the large companies were contributed to delay in deliveries because
supposed to subcontract 30 or 40 percent of these plants could not work simultaneously
their orders to smaller firms, teaching them on all their orders full blast. "Work on one
the necessary techniques and assisting them order," he wrote, "is at a standstill because
in getting into production. But subcontract- a 'higher priority' has been temporarily as-
ing was a controversial subject in 1942. To signed to another order." This shifting of
the Big Five, it was an obviously necessary priorities in overloaded factories delayed
technique not entirely new, since most of
less favored, yet badly needed, products. He
them habitually subcontracted for parts and
wanted more insistence that the big com-
subassemblies and in some cases for com-
plete units under sublicensing agreements. 54
(1) Prog Annex No. 8, 16 Feb 42; (2) Sup-
plement to Annex No. 8, 16 Feb 42; (3) Supple-
53
For further discussion of the spare parts prob- ment to Annex No. 9, 2 Mar 42. SigC EO 319.1
lem, see below, pp. 525ff. Prog Annexes, 16 Feb-16 Mar 42.
PREPARING FOR THE FIRST MAJOR TEST 329
panies subcontract to the smaller, less busy, rison, his Director of Procurement, in-
55
factories. structed all supply officers to utilize small
Of the loaded concerns Western Electric war plants to the greatest extent possible,
was the largest, in terms of the Signal Corps and General Colton instructed all branches
contracts it held at midyear. Its share was of the Signal Supply Service to see that
$932,000,000 of the four-billion-dollar Sig- "when these plants are ready to take or-
nal Corps outlay. Nearest runner-up was ders, they are given orders promptly."58
General Electric, with $386,000,000 on For hearings before the Senate Small
contract, followed by Bendix ($325,000,- Business Committee, the Signal Corps
000), Westinghouse ($263,000,000), and thumbed through its procurement records
RCA, only $84,000,000. Of the remaining seeking the latest subcontracting figures.
248 manufacturers holding Signal Corps They showed that on 1 September 1942
contracts aggregating over $100,000, only the Signal Corps had 25,521 prime con-
three had contracted for more than $50,- tracts with a dollar value of $3,098,329,-
000,000: War Supplies Limited, $62,000,- 568, and 500,000 subcontracts with a dol-
000; Philco, $60,000,000; Galvin, $55,- lar value of $1,120,000,000, or 36 percent
000,000. Seven held contracts aggregating of the total. Small war plants (that is, plants
above $10,000,000: General Cable, $29,- employing 500 or less people), held 17,009
000,000; Belmont Radio, $22,000,000; of the prime contracts, representing $464,-
Crosley, Fairchild Aviation, and Zenith, 749,435, or 15 percent of the total, and also
each $18,000,000; Farnsworth and Gray- held 156,000 of the subcontracts, with a
bar, each $11,000,000. Graybar, moreover, dollar value of $235,500,000, or 7.6 per-
was but a subsidiary of Western Electric.56 cent.59
If added pressure were needed, it was There were persuasive reasons why Sig-
supplied by Congressional action in the nal Corps contracts with large firms would
summer of 1942 with the passage of Pub- always predominate, and these reasons Gen-
lic Law 603, which granted the War Pro- eral Colton pointed out in a 25-page memo-
duction Board power to establish a Small randum. The Signal Corps procurement
War Plants Corporation to certify manu-
facturers capable of producing specific 58
(1) Incl 3, Ltr, Harrison to Chief of Tech
items of munitions, and the power to make Svs, 15 Sep 42, sub: Additional work for smaller
war plants, with OCSigO R&W Action 1, O/C Fa-
contracts with any government agency cilities and Mat Br to Colton, 6 Oct 42, sub: Small
through subcontracts with the certified bus- war plants program; (2) AG Memo, SPX 004 (10-
iness concerns.57 General Somervell, chief 1-42) SPPDW-MP for Chief of Supply Svs, 1 Oct
42, sub: Additional work for small war plants; (3)
of the Services of Supply, and General Har- Memo, Somervell for Chief of Supply Svs, 29 Oct
42, sub: Procedure on relationship with Small War
55
(1) Memo, Colton for O/Cs All Brs of Sig Plants Div War Production Board; (4) App. A to
Supply Sv, 21 Aug 42; (2) OCSigO R&W Ac- Memo, Small War Plants Div Liaison Officer to Dir
tion 1, Capt G. J. Rohrich, Air Radio Br SPSAR-1, of Sig Supply Sv, 5 Dec 42, sub: Steps SigC has
to Exec Officer Radar Div, 1 Sep 42, sub: Com- taken to comply with directives issued by SOS rela-
ment on memo from Hq SOS. SigC 319.1 Rpts tive to small war plants. SigC RP 095 Small War
Gen 2, Sep-Nov 1942 (RB-1541). Plants.
56 59
Semimonthly Rpt of Firms Aggregating Con- Memo, Colton, Actg CSigO, for Chief of Small
tracts over $100,000 as of 1 Jul 42. SigC (CH) War Plants Br SOS, 6 Oct 42, sub: Senate Small
160 Semimonthly Rpts Oct 41-Jul 42. Business Committee Hearings. SigC RP 095 Small
57
PL 603, 77th Cong, 11 Jun 42. War Plants.
330 THE SIGNAL CORPS
problem was specialized. Almost entirely it ment SCR-578 for Bendix.61 It had con-
concerned the electronics industry, because tracted with small plant pools, such as the
radio and radar equipment accounted for ninety companies comprising the Omaha
93 percent of the total dollar value of Sig- Industries, Inc., which had two contracts
nal Corps procurement; wire and wire com- for wire throwers RL-37, and the Peninsu-
munication equipment less than 6 percent; lar War Products pool of eight companies,
and miscellaneous equipment such as photo- which had a contract for telephone poles.
graphic and meteorological items less than It had spread the work on field telephone set
1 percent. The radio industry was prima- EE-8 through a number of telephone manu-
rily an assembly industry, with prime con- facturing companies in order to keep their
tractors contributing engineering, design, production lines up, even though one or two
and development talent. They placed orders of them alone could have handled the en-
for small parts with suppliers who in turn tire requirement for EE-8's. The Signal
subcontracted with other suppliers, so that Corps policy allowed a higher price to be
several layers of subcontracting resulted. paid small concerns for the same items that
In the case of one radio set, the different larger companies furnished at less cost. The
subcontracts in all levels reached into the Signal Corps had also transferred simple
thousands. Colton cited reasons why Signal items from large manufacturers to smaller
Corps contracts were concentrated among ones in order to make way for more compli-
only a few of the largest manufacturers: cated items, as in the case of headsets HS-30
the inherent complexity and technical de- transferred from Sonotone and Western
tail of much of the equipment; the neces- Electric to the William J. Murdock Com-
sity for hoarding machine tools, which had pany, Kellogg Switchboard, North Electric
resulted in repeat orders to firms already Manufacturing Company, and others.62
producing equipment, rather than tooling During the late summer, the Signal Corps
up smaller concerns; the policy of purchas- stepped up its efforts to subcontract, but
ing complete sets whenever possible to sim- without much effect. The total dollar share
plify the storage and issue problem and to remained the same in terms of percentages.
economize on signal personnel; and the ne- A report at the end of November showed
cessity for keeping maintenance and repair that there were then 586,000 subcontracts in
parts interchangeable, which once again effect, averaging in value $2,240, for a total
resulted in repeat orders from the same of $1,312,640,000. The number of prime
manufacturer.60 contracts declined, to 24,251. The total
Actually the Signal Corps had already value of all contracts was then $3,643,354,-
done much to help small business. When the 61
(1) Certification OPM to SW, 7 Oct 41, sub:
limitation orders of early 1942 had brought Unemployment at Evansville, Ind., because of
about "distressed" labor conditions in some shortage of material; (2) Memo, Dir of Army
Contract Div OUSW for CSigO, 10 Feb 42, sub:
areas, the Signal Corps had placed orders Suspension of certificates of four distressed com-
such as the one with Kingston Products munities and one industry; (3) Memo, Dir of Prod
SOS for CSigO, 26 Oct 42, sub: Placement of
Corporation of Kokomo, Indiana, which contracts in distressed areas. SigC 323.37 (FM)
was subcontracting sea-air rescue equip- Distressed Areas. Industrial Mobilization Div SigC
60
Proc Dist, Philadelphia.
Ibid. 62
Memo cited n. 59.
PREPARING FOR THE FIRST MAJOR TEST 331
63
837.45, which would account for about diting funds were in partial production. By
36 percent of dollar value in subcontracts. the end of the calendar year, it was esti-
Since the Signal Corps' figures in October mated, 52 would be in partial and 28 in full
had showed that ten firms each having con- production. The list included plants pro-
tracts totaling over $50,000,000 held more ducing capacitors, quartz crystal assemblies,
than 75 percent of all Signal Corps con- radar components, radio antenna trailer as-
tracts, it must be assumed that some of the semblies, tubes of all kinds, testing equip-
larger firms were subcontracting among ment, insulators, field wire, assault wire,
themselves, and that the percentage of sub- cable assemblies, dynamotors, motors, gen-
contracts held by small firms had not in- erators, lithium hydride, glass working
creased materially.64 lathes, powdered iron carbonyl, and tanta-
lum oxide and metal. Plants were scattered
Plant Capacity, Material Shortages, over fourteen states from Redwood City,
and Patent Licensing California, and Portland, Oregon, on the
west coast to Salem, Massachusetts, on the
Unfortunately, as far as the Signal Corps east coast, and from Shreveport, Louisiana,
was concerned, the Small War Plants Cor- north to Hamtramck, Michigan.66
poration brought in new facilities in the very Industrial capacity, however, hinged on
field of simple equipment where excess many factors, and merely building facto-
capacity already existed in established, ries was not a complete answer. Machine
qualified facilities.65 By the last quarter of tools,67 raw materials, and shortages of
1942, plant expansions sponsored by the skilled labor, plus an ever-changing tactical
Signal Corps during 1941 and the earlier situation, had to be calculated. Moreover
months of 1942 were coming into useful each industry had its particular bottlenecks.
Ever since the middle of 1942 the Signal
production. By October, 45 of the 64 Signal
Corps had been authorized to place advance
Corps plant expansions financed by Defense
orders, even up to 1944 requirements, to
Plant Corporation and production expe-
keep production lines going.68 The Signal
63
(1) OCSigO R&W Action 1, O/C Proc Br to Corps lost some facilities to other using
Spec Assignment Group Proc Br, 28 Nov 42, sub: services because it could not supply enough
SigC prime and subcontractors; (2) Incl to Action
66
2, (Spec Assignment Group Proc Br) to O/C WD Monthly Prog Rpt, Sec 4-C, Const In-
Proc Br, Memo, 28 Nov 42, sub: Contracts. SigC dustrial Facilities, 31 Oct 42, pp. 60-63. ASF
(CH) 160 Semimonthly Rpt of firms aggregating Files, DRB AGO.
67
contracts over $100,000, Oct 41-Jul 42. In machine tools for example, Signal Corps
64
Not until May 1943 did the tabulations indi- production had at first been ignored, while pro-
cate that the items which could be manufactured ducers of aircraft and munitions got the lion's
by small plants were being contracted to them. share. The height of the machine tool shortage
In that month such business placed with small passed in September 1942; thereafter Signal Corps
firms totaled 64 percent and by June it had risen needs received more attention and its machine tool
to 81 percent. Incl to Memo, OCSigO Field Ac- allotments improved. Andre E. Gerard, The Story of
tivities Br to Control Div, 20 Nov 43, sub: Weekly Supply in the Signal Corps in World War II, Pt.
summary of prod accomplishments and difficulties. III, Production (1945), SigC historical monograph
SigC RP 095 Small War Plants. B-1c, pp. 31-34. SigC Hist Sec File.
65 68
Memo, Maj D. C. Graves for O/C Facilities Memo, Dir of Proc and Distr Sv Div SOS for
Br OCSigO, 10 Apr 43, sub: Reasonable stabiliza- CSigO, 1 May 42, sub: Placement of advance or-
tion of prod schedules. SigC FM 400.192 Prod ders. SigC FM 400.192 Prod Lines—Continuation,
Lines—Continuation, Cessation, Maint, 1942-43. Cessation, Maint, 1942-43.
332 THE SIGNAL CORPS
orders to keep them fully occupied. For relatively small user of most of the strategic
example, General Olmstead had noted the materials under the Controlled Materials
Fred M. Link Company, which six months Plan, but it was highly important that its
earlier had been devoting 90 percent of its needs should not be overlooked.
capacity to Signal Corps work, but which by The Controlled Materials Plan, like its
August had only 25 percent of its plant busy predecessor allocation and priority systems,
with Signal Corps orders.69 dealt with shortages of materials, critical
The fight for raw materials had begun components, and production facilities. In-
early and had continued without respite. sofar as the production of items of electronic
All the services needed more materials than equipment was concerned, none of these
were available, thus necessitating the im- systems alone would have been enough to
position of the Controlled Materials Plan.70 assure a balanced flow of electronic items
This had gone into effect in late summer to the military services. Beginning in the
1942, running concurrently with the Pro- late summer of 1942, and continuing until
duction Requirements Plan which it would shortly after the victory over Japan in 1945,
entirely supersede on 1 July 1943. Neither a special priority system known as the Prece-
the Production Requirements Plan nor the dence System, applicable solely to the elec-
priorities system which preceded it had pro- tronic requirements of the armed forces and
vided any effective method of controlling those of the Allies, operated within the
raw materials to channel them into the framework of the War Production Board
places where they were needed most.71 With systems. The fundamental difference be-
the advent of the Controlled Materials tween the concept of "priority" and that of
Plan, the Signal Corps reorganized its field
"precedence" lay in the fact that the latter
and staff offices which dealt with materials
was a measure of military urgency only.73
and resources, and brought in four industrial
experts to assist: J. P. Howland, assistant That some such precedence system was
to the president of Zenith Radio Company, urgently needed became clear in the early
L. W. Greenwood and J. L. Huck, schedul- months of 1942. The Signal Corps' enor-
ing experts from the Western Electric Com- mous orders of electronic equipment for
pany, and W. A. Kelley from the War Pro- the Army had consumed almost the entire
72
duction Board. The Signal Corps was a plant capacity of the industry, shutting out
69 smaller but equally urgent Navy orders.
Memo, CSigO for Dir of Sig Supply Sv, 12
Aug 42, sub: Prod Control of Signal Corps Fa- Army and Navy expediters had swarmed
cilities, and 1st Memo Ind, Dir of Sig Supply Sv into contractors' plants, subjecting the
to CSigO, 16 Sep 42. File cited n. 68. manufacturers to a cross fire of conflicting
70
Memo cited n 65. For a complete history of the
Controlled Materials Plan and other priority sys- demands and competing fiercely for War
tems, see Dr. R. Elberton Smith, The Army and Production Board priorities and directives.
Economic Mobilization, a forthcoming volume in By midsummer, the various bureaus and
this series, Ch. VIII.
71
(1) CSigO, Annual Report, 1943, pp. 239ff. divisions of the two services were even com-
(2) W. P. Worrell (Prod. Div, Philadelphia SigC
73
Proc Dist), Industrial Summary: Signal Corps Ma- Joint Com Bd Rpt, History of the Precedence
terials and Resources, 31 Jan 46, pp. 13ff. SigC System (12 Dec 45), prepared by Electronics Prece-
Hist Sec File. dence List Agency, pp. 1-12. SigC Hist Sec File.
72
Supply Sv OCSigO, Review of Production Unless otherwise noted, the account which follows
Plans, 12 Dec 42, p. 7. SigC DS 400.192 Prod, is based upon this document, which contains a de-
1942-43. tailed account of the Precedence System.
PREPARING FOR THE FIRST MAJOR TEST 333
peting among themselves, to the utter con- electronic items of equipment within any
fusion of the manufacturers who were try- single preference rating category, and for-
ing to set up workable production schedules. warded the lists to the manufacturers on
The creation of the Army and Navy Elec- official forms called PL-1 forms. It was
tronics Production Agency (ANEPA) was a mandatory that the manufacturers sched-
first step toward establishing order. But it ule their production in accordance with
was not enough. these lists.
The War Production Board, which had The Precedence System as it operated
authority to take emergency action, lacked throughout the war proved to be of im-
knowledge of the relative military necessity mense value to all those concerned with the
of any particular item of equipment as be- electronic program, but most of all to the
tween the competing claims of the Army manufacturers. At first glance it might
and the Navy. There had to be "a yard- seem that integrating precedence listings
stick ... to calibrate the urgency of various into priority ratings would complicate
types of military electronic equipment manufacturers' problems, but in reality it
within assigned priorities," particularly in did nothing of the sort. It enabled them to
the field of radar. At the urging of General apply their facilities—plants, laboratories,
Colton and other Signal Corps officers, the labor, and all other resources—most ef-
Radar Committee of the Joint Communica- fectively. Manufacturers welcomed the
tions Board (a supporting agency of the precedence lists, just as they did the crea-
Joint Chiefs of Staff) prepared the first tion of the Army and Navy Electronics
radar precedence list in June 1942. In Production Agency. Indeed, the electronic
August formation of the Precedence Com- industry in general had responded to the
mittee of the Joint Communications Board wartime restrictions with admirable pa-
was authorized. The Committee soon be- tience and resourcefulness, accepting each
came a workable organization of great im- problem as a further challenge to ingenuity
portance, with a group of Army and Navy in producing equipment that fulfilled the
representatives preparing precedence lists of exceedingly difficult requirements of war-
radio, radar, sonar, and associated equip- fare. One such instance arose early in the
ment in terms of military operational im- war in connection with patent rights.
portance. Radio equipment generally employed
In October 1942 the War Production large numbers of inventions covered by
Board (through its Radio and Radar Divi- separate patents. There were few pieces of
sion) issued Limitation Order L-183-2 equipment wherein all of the patents ap-
making the precedence list for electronic plicable were in the hands of a single
equipment operative within the priorities holder; in the case of new equipment, it
system, effective 12 February 1943.74 There- was impossible for a manufacturer to know
after the Precedence Committee published ahead of time whether or not he was in-
precedence lists establishing the relative fringing one or more patents. To protect
urgency of certain types and quantities of manufacturers, there had arisen the trade
74
custom of granting blanket licenses under
Joint Com Bd Rpt, App. VII, (a) Limitation
Order L-183-a, App. XIX (d) Declaration of
large groups of patents held or controlled
Policy by JCS. by a single company, a type of pool arrange-
334 THE SIGNAL CORPS
ment. Under such a system, the manufac- rious groups, thus pyramiding royalties and
turer who sought a license obtained one increasing costs. Or, as most frequently hap-
which covered the use of all the patents pened, so contracting officers charged, they
within a single field. He paid a fixed rate of included in the cost of the contract addi-
royalty whether he used many of the licen- tional money to be set aside as a fund to
sor's patents, only a few, or, in the case of a cover such a contingency. Well before Pearl
few licensors, none at all. There were per- Harbor, the Signal Corps had taken the
haps a dozen or more such licensing groups, initiative in War Department efforts to ar-
including the Radio Corporation of Amer- rive at a satisfactory solution to the problem.
ica, the Hazeltine Corporation, the Farns- On 9 December 1941 representatives of the
worth Television and Radio Corporation, radio industry met in the Office of the
the Sperry Gyroscope Company, and others. Under Secretary of War and formed a com-
The most extensive was the RCA group, mittee on research information, whose chair-
which held licensing rights under about man was the Signal Corps patent expert,
20,000 patents, including its own, and pat- Maj. Donald K. Lippincott. The recom-
ents of General Electric, American Tele- mendations of the committee, adopted by
phone and Telegraph Company, Westing- representatives of the industry meeting in
house, and other important electronics com- New York early in 1942, in effect promised
panies. About 150 of the patents were quite a pooling of technical information by all
important to the manufacturers of Signal radio manufacturers, in return for which
Corps equipment. Nearly 80 percent of the the government would obtain licenses from
manufacturers, and a much larger percent- patent holders, and would eliminate the
age of the productive capacity of the indus- "save harmless" clause from its contracts.76
try, was licensed by the RCA group.75 By April of 1942 the government had
Government practice had been to require been offered licenses, most of them royalty
the supplier of goods on a government con- free, from 37 patent holders, including all
tract to assume the risk of any costs that of the important licensors of electronic
might be incurred by reason of infringe- equipment except Radio Corporation of
ment of any patent covering any part of America.77 That company took the position
the equipment to be manufactured. This that, because it had already licensed more
requirement was incorporated in the con- than 70 potential suppliers and offered to
tract in the so-called "save harmless" clause license all others, and because it had re-
intended to "save" the government from duced its royalty rates so that it would not
"harm" in patent infringement. Contract- make more profit in the war years than in
ors were loath to accept government con- the last year of peace, it should not be re-
tracts because of this clause. Either they re- 76
fused to bid at all, or refused to execute a (1) Report of Recommendations Adopted by
Representatives of the Radio Industry at a General
contract with the "save harmless" clause, Meeting in New York on 20 January 1942. SigC 095
or took out all the licenses offered by va- (LG-3A-78) R. Info. (2) Memo, Exec Officer Mat
Br OCSigO for Exec Officer Control Div, 27 Mar
75
Memo, Maj Donald K. Lippincott, Legal Br 42, p. 6, Item 4. Weekly Achievement Rpts, 21 Jan
OCSigO, for Maj E. S. Patterson, OUSW, 16 42-21 Apr 42. SigC Central Files.
77
Dec 41, sub: Radio licenses and save harmless Memo, Maj D. K. Lippincott for CSigO, 14
clause. JAGO (Pats Div) 201.3 National Defense Apr 42, sub: RCA licenses—government position.
Commercial Committee, Radio Valve Info Pool. SigC 095 (LG-3A-78) R. Info.
PREPARING FOR THE FIRST MAJOR TEST 335
quired to give the government a license, after" in return for the payment of
and that "the Government should continue $4,000,000 annually.80
to require its suppliers of radio equipment
to assume normal and usual responsibilities The November Drive for Production
for infringement by their products, which
responsibility can be met by their acquir- Thus throughout the summer the Signal
ing the necessary patent rights." 78 Corps struggled with a host of production
General Colton, replying to RCA, merely problems. When the planning to supply
inclosed a copy of a very recent contract North Africa finally got under way late in
in which RCA itself had objected to the August, Signal Corps procurement was
"save harmless" clause, and said, "The in- less than ready to meet the test. The fact
stance cited shows . . . that [the ques- that many of the problems affecting Signal
tion] does arise with your company, and Corps procurement were not unique did
we cannot feel that the 'Save Harmless' not make them less real or less critical. The
clause should be used only when it works disturbing thing was that the Signal Corps
to the advantage of your company and apparently was not succeeding in overcom-
omitted when it works to your disadvan- ing them as well as the other supply serv-
tage." He mentioned the fact that royalties ices. The August production meeting which
accruing to RCA during 1942 would be in had reflected the Signal Corps in so poor a
excess of $30,000,000, and added, "We do light caused repercussions that rumbled
not believe that even your admittedly great through the entire organization. General
contribution to the war effort warrants a Olmstead himself was puzzled. What was
tax of this magnitude, especially since the wrong, he queried his deputy chief signal
principal justification for royalties is to pay officer, General Code, that could "occasion
for continuing research work, and since the adverse comments and charts from SOS
your own current research, to which you re- with which I am constantly being con-
tain the commercial rights, is now being fronted?" Code's answering memorandum
done largely by government contract and acknowledged that the Signal Corps was not
on government funds." 79 meeting either its "required" or its "antici-
After a certain amount of legalistic pated" goals—that is, neither the long-range
skirmishing, RCA did arrive at a satisfac- forecast of requirements established by the
tory basis for licensing the government, at Army Supply Program, nor the more realis-
terms considered quite generous. Under the tic self-set objective, which represented the
terms of the license, RCA waived royalty portion of the ASP the Signal Corps thought
payments from the more than 90 manufac- it could produce for the period ending 31
turers already licensed, and gave the gov- December 1942. Code felt that "small
ernment a nonexclusive license to run "dur- but powerful manufacturing groups (had)
ing hostilities and for six months there- a strangle hold on [Signal Corps] con-
tracts"; that too little use had been made
78
Incl, Patent Licenses to the Government and of small concerns; and that the Signal
"Save-Harmless" Provision, to Ltr, Dr. C. B. Jolliffe,
Chief Engr RCA Labs, to Colton, 7 Mar 42. File
Corps had wasted vital strategic materials
cited n. 77. 80
79
Ltr, Colton to Jolliffe, 14 Mar 42. File cited License OCSO-DP-43-MR-1, Contract
n. 77. W1049-SC-506. JAGO Files (Patents Div.)
336 THE SIGNAL CORPS
facturers needed, to be "clever, not ortho- The Signal Corps was elated. Yet or-
dox," letting "nothing" stand in their way. ganizationally, little had changed. The top-
He ordered the inspectors to redouble their heavy and cumbersome structure remained.
efforts to complete clearances of finished The supply function was still tied to re-
equipment from plants. He organized a search and development, and still lacked
publicity campaign to enlist the co-opera- the single-minded attention of a production
tion of defense plant workers; set up daily expert. Whether it would falter or fail under
"situation charts"; and assigned Colonel the extra strain of the Army's first major of-
Bickelhaupt to get in touch with his friends fensive remained to be seen.
93
264-211 O - 78 - 22
338 THE SIGNAL CORPS
work that constituted the Signal Corps' par- Late in May a big assignment fell to the
ticipation in staff planning for actions in Signal Corps planning units. It was the de-
Atlantic areas, in Pacific areas, and in any mand for communications for BOLERO, the
other area where an invasion might be build-up operation in the United Kingdom.
launched. Olmstead had created the Plan- This plan was designed to provide a force
ning Directorate on his executive staff fol- of a million men specifically equipped to
lowing the March reorganization of the carry out an air offensive against the Euro-
War Department, and had picked Colonel pean continent in 1942, possibly a con-
94
Meade to head it. The other planning tinental operation in conjunction with the
group, the long-established War Plans Di- British in 1942, and a major joint invasion
vision, was one of the units of the Signal in 1943.97 The Signal Corps learned that it
Operations Service. Col. Francis H. Lana-
would have to provide hundreds of special-
han, Jr., served as its head until late July,
ists in dozens of categories, besides tons of
when he was replaced by Lt. Col. Victor
A. Conrad. Lanahan moved up into the signal equipment, all on very short notice.
Planning Directorate under Meade.95 Some of the units to be shipped in August
As early as January, the Signal War would have to be activated before the pub-
Plans Division had labored over a plan lication of their tables of basic allowances.
called GYMNAST, which contemplated an During June Signal Corps planners toiled
invasion of the Casablanca area. Toward a over the assignment of officers and units.
radio and wire net planned to extend Ten types of signal units, and many of them,
throughout French Morocco, the Signal were contemplated for Army Air Forces
Corps drew up call signs, prepared fre- needs. Large numbers of specialists in 48
quency assignments, and began readying categories would have to be provided for
equipment and signal units. Then in March the Signal Corps replacement pool for
GYMNAST was shelved, although it was to
reappear a few months later polished and Ltr, Actg CSigO SPBC to Dir of Plans and Opns
expanded as TORCH. In June the Joint Div, OCSigO, 31 Jul 42; (2) Rpt of Liaison Com
Officers to Joint U.S. Staff Planners, Joint Com-
Chiefs of Staff appointed a committee to mand (Communication) Centers for the Island
draw up a communication plan for the Bases in the South Pacific, 15 Jul 42. SigC OT
South Pacific. The Army member of the 32297 Gen.
(1) Incl 6, Somervell to CSigO [and other
committee was Colonel Lanahan, and supply service heads], attention: Lanahan, 28 May
another Signal Corps officer, Lt. Col. Fran- 42, sub: Planning and Opns, BOLERO, and Incl 7,
cis L. Ankenbrandt, represented the Air Resume of Studies Required, unsigned and un-
dated, on unsigned basic, 3 Jul 42, sub: Notes for
Forces, to which the Signal Corps had de- conference on BOLERO. SigC 320.3 BOLERO, May-
tailed him. Together with naval Comdr. Jul 42, (MT-24). (2) Memo, Actg Chief of Opns
A. J. Detzer, they rushed their report to Br, OCSigO for Exec Control Br, 22 May 42, sub:
Weekly prog rpt, p. 3, Item 30. Weekly Achieve-
completion in July.96 ments Rpts, 27 Apr-8 Jun 42. SigC Central Files.
(3) For a detailed account of high-level strategic
94
Signal Corps Administrative Log, 1939-1945, planning, see Gordon A. Harrison, Cross-Channel
OCSigO Orgn Chart 16, 30 Mar 42, p. 42. SigC Attack (Washington, 1951), Ch. I, and Maurice
Hist Sec File. Matloff and Edwin M. Snell, Strategic Planning
95
OCSigO Orgn Chart 17, 22 Jul 42, p. 48. for Coalition Warfare, 1941-1942 (Washington,
SigC Hist Sec File. 1943), both in the series UNITED STATES
96
(1) Incl 1, SigC Activities in the SPA, with ARMY IN WORLD WAR II.
PREPARING FOR THE FIRST MAJOR TEST 339
BOLERO.98 Late in June the planners agreed ply, and tactical command known as USA-
that for all Army radio, radar, and wire FBI. Under General Order No. 2, Rum-
installation and maintenance needs, the ad- bough was named Chief Signal Officer of
vanced section of SOS BOLERO would re- ETOUSA.102 Thus he assumed a dual role,
quire six signal depot companies, three operating as the chief signal officer of both
signal repair companies, five signal com- ETOUSA and the SOS organization. The
panies (depot aviation), twenty-eight sig- situation was somewhat clarified in July,
nal companies (service group), and one after General Eisenhower assumed com-
photographic laboratory." The task of mand of ETOUSA. The chiefs of the op-
assigning officers was complicated by the erating services were placed under the di-
fact that dispute and confusion existed both rection of the Commanding General, SOS,
in London and in Washington over the areas who was designated deputy theater com-
of responsibility and channels of command mander shortly thereafter. While the sup-
for the BOLERO operation in the United ply chiefs moved with General Lee to his
Kingdom.100 headquarters at Cheltenham, ninety miles
The SOS supply organization for the northwest of London, a representative of
build-up was being formed in the United each service remained at theater headquar-
States. It was to be headed by Maj. Gen. ters. For this duty, Col. Jerry V. Matejka
John C. H. Lee, and General Somervell had was designated for the Signal Corps.103
instructed his technical service chiefs to Matejka had been in England since May
make some of their best men available for 1941 as signal officer of the Special Ob-
Lee's staff. The Signal Corps had chosen servers' Group, and had already established
working arrangements with the British sig-
General Rumbough, the commanding offi- nals organization on the use of British in-
cer of Camp Crowder, Missouri, for this stallations and equipment. He had also
101
assignment. But on 8 June 1942 the for- ironed out many of the difficulties that
mation of the European Theater of Opera- beset the early contingents of the Elec-
tions United States Army (ETOUSA) was tronics Training Group officers sent to the
announced, to replace the planning, sup- United Kingdom for schooling in 1941 and
early 1942.104 Largely because of Matejka's
98
(1) OCSigO R&W Action 1, Lt E. E. Sullo, 102
Dir of Planning, to War Plans Div, 23 Jul 42, sub: Memo, Col M. D. Harris, Exec Officer
Tentative BOLERO complete, with AAF R&R, 15 OCSigO ETO, for Code, 5 Mar 45, sub: Orgn of
Jun 42, same sub; (2) Memo, Lanahan for Opns Hq, ETOUSA and responsibilities of CSigO, and
Div SOS, 5 Jun 42, sub: Specs required for SigC Incl 2, GO 2, Hq ETOUSA, 8 Jun 42, sub: Staff
replacement pool—BOLERO, with Incl, Spec List. of Hq ETOUSA, Tab A, App. D, to Memo, Code
SigC 320.3 BOLERO May-Jul 42 (MT-24). for Maj Gen Harry C. Ingles [1945]. SigC 370.2
99
Incl, Memo, Colton for CSigO, 29 Jun 42, ETO (App. D., Orgn of Theater Sig Pers ETO)
sub: Inspec and maint of SigC equip, with OCSigO 1942-45.
103
R&W Action 1, Meade to Dir of Sig Supply Sv, Memo, cited n. 102, and Incl 3, GO 19, Sec.
10 Jul 42, same sub. SigC (EO) 475, SigC Equip I, Orgn of Hq ETOUSA and SOS ETOUSA, 20
Gen. Jul 42.
100 104
For a detailed discussion of this point, see Ro- Ruth F, Sadler, History of the Electronics
land G. Ruppenthal, Logistical Support of the Training Group in the United Kingdom (1944),
Armies, I, UNITED STATES ARMY IN WORLD SigC historical monograph G-5, pp. 68-69. SigC
WAR II (Washington, 1953), Ch. I, passim. Hist Sec File. Upon establishment of ETOUSA,
101
BOLERO Staff, Forward Echelon GHQ, and administration of Electronics Training Group mat-
Sig SOS Rear Echelon, approved by CSigO, n. d. ters was assigned to SOS, ETOUSA, by GO 3, 8
SigC 320.3 BOLERO May-Jul 42 (MT-24). Jun 42.
340 THE SIGNAL CORPS
efforts, the Signal Corps appears to have each ring performing rather independently
been the first of the technical services to of the others. American troops comprising
acquire practical working experience in Task Force A, under General Patton, as-
105
England. signed to the western third of the invasion
Though the planning for the BOLERO around Casablanca, staged wholly in the
build-up had begun on a grand scale, a United States. Task Forces B and C, com-
sober study of the cold realities imposed prising both American and British troops
by the critical shortage of shipping soon aiming for the center and eastern sectors
demonstrated that the supply targets would around Oran and Algiers, staged in Eng-
have to be scaled downward. Even while land. Even with the best of communica-
the United States embarked on the build- tions, co-ordination between the widely sep-
up to the limited extent possible, the strat- arated groups would have been difficult.
egy which underlay the plan was being ques- And Army's communications were not at
tioned and revised.106 By mid-July plans their best during the summer and autumn
for a 1942 attack on the Continent were of 1942. It was to be many months yet be-
abandoned, and the Allies settled upon an fore new Signal Corps developments and
invasion of North Africa instead. TORCH installations would make them so.
became the design which would launch Furthermore, the BOLERO build-up had
American troops on their first invasion been intended to supply American troops
across the Atlantic. While a planning com- in lands well equipped with communica-
mittee in London under Maj. Gen. Mark tions, which North Africa lacked. To rem-
W. Clark set to work on 13 July to map edy the defect, the Signal Corps proposed
out the grand strategy for the invasion, the the "A to H Wire Plan."109 This plan
Office of the Chief Signal Officer in Wash- aimed to provide a trunk line about 900
ington turned to a survey of communica- miles long between Casablanca and Al-
tion facilities in French and Spanish Mo- giers, together with subsidiary telephone
rocco, in Algeria, and in Tunisia.107 communication to major headquarters.
Top-level planning suffered from confu- The Signal Corps planners reckoned on car-
sion, haste, and conflict between the Brit- rier telephone lines, with repeater stations,
ish and American viewpoints on the scope and upon voice frequency carrier telegraph.
and objectives of the operation.108 To begin Also, they planned to link various air force
with, mounting the invasion would be some- and ground force headquarters by means
thing of a three-ring circus, the actors in of a new development called rapid pole
105
Ruppenthal, Logistical Support of the Armies, line.110
p. 50.
106 109
Harrison, Cross-Channel Attack, pp. 21-31. So-called for reasons of security. The North
107
(1) Capt Sidney L. Jackson, Tactical Com- African station sites were designated simply as
munication in World War II, Pt. 1, Signal Com- Station A, and so on, through station H. Sig Sec,
munication in the North African Campaigns AFHQ, History of the Signal Section, Allied Force
(1945), SigC historical monograph E-3a, p. 2. Headquarters, 24 July 1942-10 November 1945
SigC Hist Sec File. (2) Interv, SigC Hist Sec with (1945), p. 15. (Hereafter cited as Hist Sig Sec
Maj C. B. Riggs (formerly SigC planning officer AFHQ.) SigC Hist Sec File, A47-200, Drawer 15.
110
for Task Force A), 17 Nov 43. Capt Sidney L. Jackson, Fixed Wire,
108
For complete discussion see Leighton and NATOUSA: Chapter I of Theater Fixed Networks
Coakley, Global Logistics and Strategy, 1940- (1944), SigC historical monograph E-1a, pp. 1, 8.
1943, Ch. XVI. SigC Hist Sec File.
PREPARING FOR THE FIRST MAJOR TEST 341
The Signal Corps planners trusted that phone switchboards, 69A1 teletypewriter
the first troops ashore would need little more switchboards, C and H carrier telephone
than switchboards in the way of wire equip- systems, AC-operated repeater stations, and
ment (they would be well supplied with DC telegraph. Some, probably unaware of
portable radios of course). They intended current radar developments, thought this
the Signal Corps units to put local facilities was "the hottest job at present for the Sig-
to work, rehabilitating and improving them. nal Corps" in Western Electric shops, and
But trunk lines over the large distances of the Kearny plant was asked to rush it in
North Africa called for large-scale arrange- every way. It lagged, nonetheless, and by
ments. For the Oran and Algiers area, the October the Signal Corps became so frantic
planners in their "Operation TORCH Wire that it waived all government inspection
Plan," edition of 22 September, presented while granting permission to fill the A to H
the details in fine order, on paper be it re- project needs by diversion from any other,
membered. They planned good wire and save only the Alcan Highway job.112
cable systems, utilizing local facilities when The equipment thus planned did not ar-
available; but for the most part, the equip- rive in North Africa nearly as soon as in-
ment would have to come from the United tended, despite all efforts and deadlines.
States, and in large quantities, in order to The planners who thought the troops would
provide, for example, seven voice and eight find sufficient equipment to get along well
telegraph circuits over the 836 miles be- enough initially and who thought they pos-
tween Casablanca and Algiers; six voice and sessed a fairly complete summary of what
ten telegraph circuits over the 267 miles would be available in the way of wire, were
between Algiers and Constantine, and so to get some dismal jolts.113
on.111 As for large fixed radio installations, the
Toward getting material to implement planners knew that several high power sta-
the A to H plan, Captain J. D. Stewart, tions already existed in North Africa. The
Army Communications Division, conferred Signal Corps, organizing the 1st and 2d
in September with the Long Lines and Radio Broadcasting Detachments to take
Operations and Engineering Departments them over,114 could expect some damage,
of the American Telephone and Telegraph. and therefore ordered equipment of a type
Long Lines agreed to prepare the detailed required to repair and rebuild them if need
material and equipment lists. Facilities be. How to get the right parts and compo-
would include hundreds of miles of cable nents was a poser until someone discovered
and four-wire lines for carrier C and H that a French communication company had
operation. Local facilities would make it un- operated in New York several years earlier.
necessary to construct new pole lines in some The equipment was still there, idle, and was
cases, the planners were assured. This, how- presumably the same type as would be
ever, was to prove a painfully misleading found in French Morocco. Arrangements
piece of optimism. As the deadline for ship- were made for Western Union to buy up
ment approached, the heat of activity inten-
sified. The requirements by 23 September 112
Ibid., pp. 5-10.
113
included the new packaged No. 11 tele- (1) Ibid., p. 15. (2) Interv with Maj Riggs,
17 Nov 43.
111 114
Ibid., pp. 2-4. CSigO, Annual Report, 1943, p. 305.
342 THE SIGNAL CORPS
the company, whereupon the Signal Corps nage of supplies for TORCH. There were far
requisitioned the equipment to ship to North too few service troops available in the
Africa. But of course most of the larger theater. Moreover, equipment was poorly
radio equipment would have to be brought marked, badly packaged, hard to identify,
in.115 TORCH radio plans touching Oran and often misrouted. Under the task force
alone called for a complete corps signal bat- shipping plan then used, organizations were
talion, with additional men to handle extra shipped to the United Kingdom on fast
equipment which would be issued beyond transports and the bulk of the organiza-
the table of basic allowances. The equip- tional equipment by slow convoy. The
ment list included six SCR-299's, power equipment was supposed to be marked in
units, portable masts, and accessories, not to such a manner that it would catch up with
mention parts and supplies for 60 days' the unit in England. Actually, this "marry-
maintenance. Included, too, was a 40-kilo- ing" of equipment and organizations was
watt radio station, able to provide high speed exceedingly difficult. Either the equipment
multichannel facilities. In case it could not arrived first and was stowed away in ware-
be had immediately, the planners allowed houses where it could not always be located
for two smaller stations, of 10- and 1-kilo- when it was needed, or the unit arrived
watt outputs, to be landed directly after the first, and, lacking equipment, drew new
assault to serve until the 40-kilowatt set items from stock, thus depleting the already
could be obtained.
116
scanty supply.117
Nevertheless, hard work and the best of In the last weeks of preparation, the
plans could not completely offset the short theater demanded so many items which had
time allotted to TORCH preparations and already been shipped "once or twice" that
the difficulties which attended the physical supply officers in the United States who
separation of the planners. The Western were concentrating their efforts toward
Task Force was to be equipped wholly from equipping the Western Task Force became
the United States, and was thus the focus of alarmed lest General Patton's force should
planning in Washington. In theory, the be stripped of essentials. They took equip-
American forces within the central and ment from units in training, diverted items
eastern groups in England were to be sup- from lend-lease shipments, and "borrowed"
plied largely from resources on hand from from equipment already earmarked for
118
BOLERO shipments. The rub was that too other destinations.
little had been sent under the BOLERO plan. The Signal Corps officers, like those of all
Furthermore, as D Day drew near, it be- the other technical services, spent hectic
came apparent that many of the items which weeks of preparation in a most confused
had arrived were hopelessly lost in British situation. Some planners were in Washing-
warehouses. The SOS, ETOUSA, had not 117
(1) Extract of Sig Com Items, from Lessons
had time to become firmly and efficiently on Operation TORCH, Hq Mediterranean Base
organized to handle the daily increasing ton- Sec, Office of CG, 4 Jan 43. SigC Hist Sec File,
North Africa Folder 2. (2) Leighton and Coakley,
115
Interv with Maj Riggs, 17 Nov 43. Global Logistics and Strategy: 1940-1943, p. 430.
116
Msg, OPD to CG ETO (6769), R-25, 21 (3) Ruppenthal, Logistical Support of the Armies,
Aug 42. [WD Gen] Staff Com Center Msg Log pp. 95-97.
118
File. Interv with Maj Riggs, 17 Nov 43.
PREPARING FOR THE FIRST MAJOR TEST 343
ton, some in Norfolk, and some in between Thus, the scene which Colonel Ham-
and up and down the coast. The headquar- mond, the signal officer of the Western Task
ters of the Amphibious Force (Atlantic Force,120 entered when he arrived in Wash-
Fleet), and its training facilities, were in the ington to assume his duties was anything but
Norfolk area, and there the Amphibious bright. He had scarcely two months before
Force staff, responsible for specialized D Day, 8 November, in which to complete
training, naturally remained. But the head- enormous tasks such as (1) working out the
quarters of "Task Force A" was in the Mu- details of the complex communications re-
nitions Building, Washington. This sepa- quired ; (2) determining the specific signal
ration at once presented difficulties of main- troops and equipment needed for the in-
taining liaison, co-ordinating planning, and vasion; and (3) preparing the signal troops
maintaining secrecy. "These difficulties," and their thousands of tons of equipment
one officer described in a post mortem, for shipment on the assault and supporting
"cannot be over-emphasized." Signal offi- convoys. Undoubtedly, he received invalu-
cers found their plans bedeviled by num- able assistance from officers in the Signal
erous factors, on which they were badly in- Corps Directorate of Planning and in the
formed or about which they were uncertain, War Plans Division (the annual report of
for reasons often beyond their control. the Chief Signal Officer lauds especially the
They overestimated the capacity of ports to Directorate of Planning). These men, work-
handle the equipment which they planned ing under conditions of extraordinary se-
to supply, and they failed to grasp the limi- crecy, hastened the activation of special
tations of convoys. Ships would have to units, the training of signal troops, the pro-
serve as communication centers in some curement, assembly, and shipping of equip-
cases, and here the planners had to wait ment. In general they co-ordinated the
upon Navy's choice of ships before they multifarious activities of the Office of the
could estimate equipment needs and engi- Chief Signal Officer toward meeting the D
neering. Often the choice remained uncer-
Day of America's participation in the first
tain until very late. Furthermore, the signal
great Allied amphibious landing upon hos-
officers in subordinate headquarters, which
tile shores.121
were dispersed along 500 miles of the At-
In England signal plans for TORCH pro-
lantic coast, were unable to participate in
gressed at Allied Force Headquarters, of-
the planning, and the Force Signal Section
ficially activated on 15 September under
had to do the job for the Sub-Force as well
General Eisenhower. His Chief Signal Of-
as for the parent organization. Worse, there
ficer, Brig. Gen. Jerry V. Matejka, was well
was no opportunity for the Sub-Force signal
officers to become familiar with the plans 120
Colonel Hammond served as signal officer for
thus formulated. Not one of them had had General Patton throughout World War II. Col
experience in amphibious operations or had Elton F. Hammond, "Signals for Patton," Signals
II: 1 (September-October 1947), 5.
even witnessed the training of signal person- 121
(1) CSigO, Annual Report, 1943, pp. 76-77.
nel in the exercises at Solomon's Island, (2) Memo, Lt Col J. E. Waiters for Directorate of
Planning, 16 Nov 42, sub: Summary of special
Maryland.119 units and equip for Task Force A. SigC 475 (EO-
4-9) Equip and Movement Orders NATO, 1942-
119
Jackson, Fixed Wire, NATOUSA, pp. 5-6. 43.
344 THE SIGNAL CORPS
aware of the difficulties imposed by the iso- Headquarters had to deal not alone with
lation of the Western Task Force group, far the Royal Corps of Signals, but with several
from the central and eastern groups in Eng- other components of His Majesty's forces
land. To this factor he afterward ascribed as well.124
"many unfortunate developments which Matejka and his British and American
should be avoided." 122 Matejka was an ideal officers in the AFHQ Signal Section were
choice for the position he filled. The year expected to furnish communications for the
and a half he had spent in England work- entire headquarters with all its amazingly
ing closely with British signal officers had diverse elements. That meant providing
given him a familiarity with British signal service for representatives of the United
matters and personnel that proved invalu- States Army and Navy, Royal Navy, British
able for the task of co-ordinating the signal Army, Royal Air Force, and American and
procedures of the two nations. Matejka's British civilians, diplomatic, political, eco-
deputy was a British officer, Brig. W. A. nomic, propaganda, and counterintelli-
Scott. In all matters, British and American gence agencies. All this lay far beyond the
signal experts worked side by side. For ex- service which a headquarters signal section,
ample, Matejka's radio officer and author- United States Army, had been accustomed
ity on frequency allocations was Capt. Es- or designed to provide. Much had therefore
terly C. Page, whose British counterpart to be extemporized, or rather pioneered.
was Maj. C. A. Henn-Collins.123 There were additional jobs, too, such as pro-
These signal officers were pioneering viding fixed plant equipment for the British
something new in military communications, since the American radios were more pow-
setting a precedent for things to come. There erful and better suited to the long distances
were many novel problems to contend with. of North Africa. Yet the American signal
Patton's force would be all American, but supply was already more than fully occu-
the force staging in England would include pied with American troop requirements for
both American and British units. This all three task forces. Moreover, time was
meant that American and British communi- desperately short. It was August before
cations would have to be co-ordinated. planning began; it was September before
There were no precedents, and neither na- the Allied Force Headquarters was actually
tion's set of rules would do by itself. Hence activated. Each problem had to be solved
a Combined Signal Board, which met daily in some fashion, nevertheless.
during the planning phase, had to sit down In the Signal Section, the American share
and hammer out new techniques and fell to four Signal Corps officers, who started
arrangements. Further, since the signal of- work on 15 August; they with several others
ficer in the United States Army was respon- who came in subsequently worked there-
125
sible for radar, signal supply, communica- after night and day. Radio circuits had
tion intelligence, and photography, all
124
outside the province of his British counter- (1) Jackson, Tactical Communications in
World War II, Pt. I, pp. 3-4. (2) Hist Sig Sec
part, the Signal Section of the Allied Force AFHQ, pp. 7-14. (3) Interv, SigC Hist Sec with
Matejka, Apr. 47.
122 125
Jackson, Fixed Wire, NATOUSA, p. 3. The first four were General Matejka, Captain
123
Interv, SigC Hist Sec with Lt Col Esterly G. Page, Maj. Frederick C. Lough, and Lt. Col. Harold
Page, Sep 44. G. Hayes, the last a signal intelligence officer. Sub-
PREPARING FOR THE FIRST MAJOR TEST 345
to be decided upon, frequencies allocated, symbol would by itself indicate that the
combined procedures ironed out. At one message was American and might even indi-
point the officers had developed the neces- cate the location of the general himself.127
sary schedules for sixty days in advance, but Eisenhower ordained that each service
then were compelled to recast everything use its own communication procedures for
in consequence of a major change in the its own intercommunication. He added that
over-all plan. Improvising became the rule two services, if not of the same nation,
rather than the exception. Small wonder would use the signal procedures already in
that Captain Page felt it "a great relief" effect between them. American-British com-
when he left "the frenzy of last minute munications, if not already provided with
changes" for North Africa and Algiers and an agreement, would employ the standard
could "relax and rest in a comfortable bunk radio procedure, the self-evident code, or
with nothing particular to do." 126 "Q" signals.128 Obviously, much remained
Communication procedures were bound to be done, and this was the job of the Com-
to be most perplexing. They are bad enough bined Communications Board (CCB). The
when only one homogeneous army is oper- AAF in the European Theater of Opera-
ating, for they must insure clarity, make tions was especially concerned about keep-
certain that men know with whom they are ing up to the minute on all communica-
communicating, and conceal as much infor- tions procedures, instructions, promulgation
mation as possible from the enemy's inter- orders, and the like issuing from the CCB,
cept service. But in TORCH the normal and Eisenhower asked on 7 October that
perplexities would be compounded. There his ETO air force be so posted.129
would be not one army, but several. In Au- General Eisenhower's staff in London
gust General Eisenhower warned the Ameri- and the planners in Washington were now
cans not to affix topmost priority notations feverishly laboring at TORCH arrangements,
to their messages, as was the practice, ac- which, in Signal matters, revolved around
cording to American Signal Operating In- trained operators, intricate equipment, and
structions. The British had no equivalents complex communication procedures. Late
for such notations and, if the priority symbol in August they contemplated for signal
appeared in their traffic, it would immedi- troops: One battalion armored; one corps
ately flag the message for the benefit of any battalion; one radio intelligence company;
enemy monitor intercepting and copying one operations company separate; one con-
British radio communications. The priority struction company separate for the Allied
Force Headquarters; one signal operation
sequent arrivals included Col. F. L. Gillespie, Maj. company separate; one signal construction
K. Buchak, and Capt. R. Jones. Intervs, SigC Hist
Sec with Col Page, Sep 44, and with Lt Col Fred- battalion; three port signal service com-
erick C. Lough, 5 Oct 44. For the complete list of panies; one signal service company to in-
Allied officers in the Signal Section, see Hist Sig Sec
AFHQ, pp. 8-9. clude a 115-kilowatt team; four 300-kilo-
126
(1) Interv with Page, Sep 44. (2) Jackson,
127
Tactical Communications in World War II, Pt. I, CG ETO (10805) No. 1570, 27 Aug 42. Msg
pp. 4-5. (3) Capt Frederick Reinstein, Signal Log File, Staff Com Center.
128
Corps Fixed Communication in the European and CG ETO (7716), No. 1339, 20 Aug 42. Msg
Africa-Middle Eastern Theaters (1945), SigC his- Log File, Staff Com Center.
129
torical monograph E-7, pp. 69-70. SigC Hist Sec CG ETO (2826) No. 3208, 7 Oct 42. Msg Log
File. File, Staff Com Center.
346 THE SIGNAL CORPS
watt teams; four SCR-188 teams; six SCR- phases under naval control, and the stages
299 teams; one pigeon platoon; one cable of Army consolidation ashore. The com-
operation section of 18 men; and one ad- bined signal center would be at Gibraltar
ministrative section of 13 officers and 238 initially, in the advanced command post.
enlisted men. The 299's and 188's, Eisen- The three invasions would establish signal
hower intended to be used for immediate centers for their command posts as they
communication upon landing. Fixed radios landed, at Algiers, Oran, and Casablanca,
would follow for Army use, not to mention and would at once set up radio channels
the array of radio and radar which the Air between themselves and between them and
Forces would have to have, principally the Gibraltar. These would be the essential com-
very new, very high frequency equipment mand nets, relying upon radio until wire
for air-to-air and air-ground communi- facilities could be taken over from the
cation, together with LW and GCI radars.130 Moroccans or could be installed by Army
An added wrinkle was communications for units. The plan included diagrams which
psychological warfare. Eisenhower on 6 Oc- set forth the channels appointed for the
tober desired equipment and operators for United States Army and the Air Forces, for
three American-British teams intended to the British Army and the Royal Air Force,
broadcast to Arab and French citizens, to and also channels for naval shore stations.
French troops, even perhaps to German and Many details together with plans for tacti-
Italian troops. The teams planned to oper- cal nets within the infantry and armored
ate transmitters and sound trucks based at force were left to the task force commanders,
Casablanca, Fez, and Oran,131 since in this effort as elsewhere Signal Corps
The signal plan for TORCH did not attain responsibility stopped at the division. Below
printed status till 28 September. Worked that, the several signal users took over,
over by signal officers, both American and within a framework of limitations, such as
British in London, and by Colonel Ham- frequency allotments and cryptographic
mond and his associates in Washington, it regulations, imposed by the Chief Signal
laid down in general outline the communi- Officer.
cation arrangements for the several phases Above the division, the Signal Corps re-
of the great effort: the approach and assault tained responsibility for communications,
130 for the operation of headquarter message
(1) OPD to CG ETO (6769) No. R-25, 21
Aug 42, and reply, CG ETO (9469) No. 1453, 24 centers and the large linking networks. Here
Aug 42; (2) CG ETO (8238) No. 2387, 18 Sep the signal plan for TORCH went into detail,
42; (3) CG AAF to CG ETO (7669) No. R-1098, assigning the equipment and the men to
23 Sep 42. Msg Log File, Staff Com Center.
CG ETO (2552) No. 3186, 6 Oct 42. Msg Log operate it. The radio sets were the large
131
File, Staff Com Center. Two weeks later the Chief SCR-299's and 188's, and the men were
Signal Officer urged that the 2d Signal Radio Serv-
ice Section (Psychological Warfare Unit) be acti-
the members of three companies of the
vated at Fort Monmouth about 2 December 1942, 829th Signal Service Battalion. The Algiers
including propagandists and foreign-language an- assault to the east, principally a British
nouncers to broadcast "for the enlightenment of
persons to whom the broadcast is beamed." Memo, operation, would receive two 299's (to com-
Col Conrad, War Plans Br, for Control Div, 29 municate with the 299's at Oran), four
Oct 42, sub: Weekly digest of prog and problems, 188's, two one-kilowatt and two 300-watt
p. 3. Digest of Prog, 28 Oct-18 Nov 42. SigC Cen-
tral Files. transmitters, all this to be handled by Com-
PREPARING FOR THE FIRST MAJOR TEST 347
pany A of the 829th Signal Service Battalion one in the Safi sector far to the southeast.
(the British of course would land radios of All four would tie together the three assault
their own, such as their No. 33's for long areas, widespread over several hundred
circuits to the United Kingdom and Malta). miles of the western Morocco coast. This
At Oran in the center where both Americans channel, designated F5, would operate on
and British would attack, the planners as- 2,770 kilocycles. Next came the administra-
signed six 299's and six 188's under Com- tive radio channel F4, on 1,610 kilocycles,
pany B. Two of the six 299's at Oran would which would net WTF headquarters, using
link up with their counterparts in Algiers, an SCR-193, with an SCR-177 of the Port-
two with Casablanca, and two would make Lyautey main shore-party command post,
contact with Gibraltar. Such were the hopes and with an SCR-197 of the Safi main
and plans. To the several separate Ameri- shore-party command post. Still another
can landings planned in the Casablanca long-range radio net would use channel
area were assigned four 299's and several F29, on 4,070 kilocycles, tying the com-
188's under Company C of the 829th.132 mand posts of each sector with regimental
While the establishment of this command headquarters and the main shore-party
net linking the headquarters of the several command post, all using, in the case of the
task forces and the Allied Force Headquar- Port-Lyautey sector, SCR-193's.
ters at Gibraltar would be Signal Corps' Numerous nets, smaller in scope but
largest single responsibility after task force larger in the number of stations, entailed
headquarters went ashore (until then, ship many short-range radios such as the SCR-
radios and message centers would have to 511, the SCR-284, and the Navy's TBX's
serve), Signal Corps planners had many and TBY's. These were nets for the beach
other tasks, such as apportioning the chan- battalions in each sector, for the naval ship-
nels for all the lesser nets. shore circuits, for the Army interbeach nets
Consider, for instance, the Western Task (in each sector were numbers of landing
Force alone, WTF, in Washington gen-
beaches, Red 1, Red 2, Yellow 1, and so
erally called Task Force A. First came the
on), and for the boat-control circuits. Then
command net, entailing four SCR-299's:
one at task force headquarters, one in the there were frequencies for the very short
Port-Lyautey sector to the northeast, one range SCR-536's, good for a mile or so,
in the Fedala sector near Casablanca, and within small infantry units. Finally, there
were special channels—special frequencies
132
Ltr, Brig Gen W. B. Smith, by order of Eisen- set aside, for instance, for naval air support,
hower, to CGs WTF, CTF, ETF et al, 28 Sep 42, different in each sector, and special frequen-
sub: Sig Com Opn TORCH with diagrams and
with App. A, Sig Operating Instructions Radio cies for fire control nets, using SCR-284's.
Com 3, the whole constituting Incl 4 with Memo, All of these were amplitude-modulated
Gen Handy, ACofS, for Secretariat Combined
Chiefs of Staff, 16 Oct 42, sub: Data from AFHQ radios: the vehicular 193, mounted in a
OPD 381 TORCH, Case 9. A detailed account, jeep or half track; the not very portable 284,
"Case History in Confusion," describing the hasty which weighed over 100 pounds and which
readying of the 829th Signal Service Battalion is
given in Ray S. Cline, Washington Command Post: had to be set up and hand-cranked to oper-
The Operations Division, UNITED STATES ate; and the genuinely portable 511. All of
ARMY IN WORLD WAR II (Washington, 1951),
pp. 183-87. them operated on the old conventional
348 THE SIGNAL CORPS
amplitude-modulated waves. They were, There would be three subordinate forces,
therefore, subject to interference and static. North, Center, and South. The North Force
But now for the first time new frequency- was commanded by Brig. Gen. Lucian K.
modulated radios would see action, installed Truscott, Jr., whose signal officer would be
in Armored Force tanks and cars and in Maj. Eugene A. Kenney, the divisional sig-
Artillery Corps vehicles also. The 1st Ar- nal officer of the 9th Division. Its head-
mored Division had some of the very first quarters would remain aboard the transport
military FM sets, the stopgap Link-built USS Henry T. Allen, until it could land
SCR-293 and 294. The 2d Armored Divi- at Port-Lyautey and thence move by D plus
sion had the new FM "500" series sets: three to Rabat. The Center Force under
508, 528, and 538. The Artillery had its Maj. Gen. Jonathan W. Anderson had as
"600" series counterparts, including some its signal officer Lt. Col. James F. Brooke,
portable battery - powered SCR - 610's. Jr., signal officer of the 3d Division. The
These frequencies were determined by the Center Force headquarters would remain
crystals supplied with the radios. They on the transport USS Leonard Wood until
would not interfere with AM nets or with it could go ashore at Fedala, thence to Cas-
each other. The Signal Operation Instruc- ablanca. The South Force, under Maj. Gen.
tions needed to say little respecting them, Ernest N. Harmon, was served by Lt. Col.
other than that "existing FM channels will Donald H. Nelson, the signal officer of the
be utilized . . . and will be retained after 2d Armored Division, who would main-
the conclusion of the Assault Operation for tain headquarter communications aboard
subsequent operations. . . . The Division the USS Harris till Safi might fall.
Signal Officer will co-ordinate channels Colonel Hammond issued details on ra-
used and allocate any special frequencies dio, wire, and visual communications; on
required." 133 call signs and frequencies; on codes and
Late September saw the days of plan- ciphers; on radio intercept, radio jamming
ning and preparation grow fewer as they and Countermeasures; on naval fire control
merged into the days of loading the ships, parties using SCR-284's; on air support
for by the 24th of October, the convoy of parties using SCR-193's mounted in jeeps;
the Western Task Force would sail from on ground-air support parties using SCR-
America's east coast. On 3 October Colonel 299's and 522's. He dealt with supplies and
Hammond, General Patton's signal officer, depots, even with the marking of supplies
got out the signal plan specifically for Task for particular units, emphasized as signal by
Force A, nineteen pages of details with many an orange stripe and marked whether radio
appendixes and circuit diagrams. General or telephone equipment. According to the
Patton planned to maintain his headquar- Task Force A plan, Hammond completed
ters aboard the heavy cruiser USS Augusta, arrangements with the Navy, with the Brit-
until the signal officers could move ashore ish, and with the Air Forces. "The Navy and
at Fedala and thence to nearby Casablanca. Army Air Force is trained in Joint U.S.
Army-Navy Procedure FM24-10," assured
133
Signal Operation Instructions Item 3bl, 28 the plan. It gave assurances too that "the
Sep 42, Task Force A Signal Operation Instruc-
tions, Serial 32. SOI Folder, OPD 381 TORCH. British Navy, Army and R.A.F. are trained
PREPARING FOR THE FIRST MAJOR TEST 349
in the use of basic British-U.S. W/T Proce- Every morning, beginning 25 September,
dure." 134 Colonel Hammond held a short conference
All this, which was set forth in the plan in the Office of the Chief Signal Officer with
with the plausible appearance of a fait ac- his assistants, such as his executive officer,
compli, was far from accomplished. As a Maj. William B. Latta, and his communi-
plan it was doubtless good, but like any cations officer, Maj. Jesse F. Thomas. Col.
large blueprint, it could not be carried out Emil Lenzner participated heavily as Sig-
overnight. In some cases, the units lacked nal Corps representative for the Services of
even training. They were being formed Supply. The signal plan and Signal Operat-
hastily, their equipment packed sight-un- ing Instructions, SOI's, were being rushed,
seen too often. In all cases, the full quota of continually revised, and brought up to date.
equipment would not be sent. It was already In particular, the SOI's of the several divi-
3 October and shipping exigencies were sions, the 3d and 9th Infantry, the 2d Ar-
even now compelling the AFHQ to ship mored, and so on, had to be correlated and
only one quarter to one half of the quota of completed. The Signal Corps had to work
vehicles alone.135 Men and equipment were across differences between services. Colonel
already moving to the ports of embarkation Hammond had planned for joint Army-
amid haste and confusion. Most notable Navy message centers on Navy ships, only
was the failure to comply with all the de- to get word on 7 October that the Army
tails of the printed plan which touched bat- would be eliminated. The Navy would be
teries and waterproofing.136 responsible for all communications until
134
after the assault phase. Yet how could Navy
Annex 3 to Opns Plan Hq Task Force A, Sig
Com Plan, 3 Oct 42, from G-3 to CG Task Force
expect to know how to handle Army's own
A. OPD 381 TORCH. The plan designated ten Sig- particular brand of communications? And
nal Corps units to participate with the ground forces in truth at the invasion the Army did have
in the assault, with many more units to follow soon
on subsequent convoys. About 700 men, it was
shipboard signal centers and operators. The
planned, with about 100 vehicles would serve the Air Forces at the last moment on 16 October
ground forces. Several hundred more served Army altered its radio frequencies.137
Air Forces units.
135
See Leighton and Coakley, Global Logistics A sore point with the Navy was the in-
and Strategy: 1940-1943, Ch. XVI. stallation of a broadcast transmitter on a
136
These details of the plan for the Western Task
Force read as follows: naval ship—a propaganda station favored
"Batteries. Every radio set operated from dry bat- by G-2 both of the War Department and of
teries will land with new batteries installed and
three new sets of batteries spare. These spare bat-
Task Force A. But "the Admiral," Ham-
teries will be carried in a watertight container. All
batteries will be tested with a voltmeter prior to this purpose. These bags will not be removed until
landing, and dates on batteries checked. No time- radio sets are landed, except in case of those radios
expired batteries will be used. . . . Storage bat- which may be required to operate during the ship-
teries will be fully charged prior to embarkation. to-shore movement, and for the purpose of inserting
Arrangements will be made by communications offi- new batteries prior to embarkation into landing
cers aboard ship with the ship's engineer staff for craft."
periodic charging of all storage batteries, radio or Annex 3 to Opns Plan Hq Task Force A, 3 Oct
vehicular, during the voyage. All storage batteries 42, p. 10, cited n. 134.
137
will be landed fully charged. Log, Hammond, Hq Task Force A conf, 7 Oct
"Waterproofing. . . . Every portable radio set, 42, par. 3; conf, 17 Oct 42, par. 18. SigC (EO)
combat loaded, will be enclosed in a watertight 320.2 Orgn, Tng and Equip for Overseas Sv, Jan-
container. Special canvas bags are being issued for Feb 43 (EO-4-8 No. 2).
350 THE SIGNAL CORPS
mond reported in the morning conference bat loaded, will be enclosed in a watertight
of 25 September, "stated that this [station] container." Fine, if done, but what about
should not be brought along unless abso- vehicular radios? The question arose on 6
lutely necessary." Necessary it was made out October and again on the 8th, when Ham-
to be, and Western Electric hurriedly ac- mond asked if the radio sets in vehicles had
quired one of its five-kilowatt transmitters been waterproofed. Major Latta thought
back from the purchaser, a Jersey City that they had been, but Hammond wanted
broadcast station, and dispatched it to Nor- to be sure and asked Major Thomas to
folk. The Navy would make the installation check up. Thomas found that they were by
supervised by one Signal Corps officer, and no means waterproof, not to the extent that
the Navy insisted upon mounting it in a they could be immersed. Evidently they had
battleship, the Texas, so Major Thomas re- only covers to keep out weather and rain,
ported to Colonel Hammond on 29 Septem- for Thomas replied on 11 October "that
ber. Hammond foresaw the trouble which the only thing they do is to use the covers
might ensue if the ship's big guns were fired, provided with the sets and keep them cov-
shocking the commercial set which had not ered." However, the men of the 1st Ar-
been built to take the Navy's hard knocks. mored Signal Battalion were waterproofing
The next day he insisted that extra parts be their vehicular sets in a superior way. Colo-
provided against breakage, which did, in nel Hammond asked that the radios of the
fact, occur when the Texas fired her heavi- 3d Division be similarly protected.139
est guns against North African targets. The Time was too short. As late as 30 Septem-
demand for the propaganda radio was so ber the signal planners of Task Force A ad-
strong that on 1 October Hammond de- mitted that the instructions they were
scribed the broadcast unit (he was evidently drawing up for radio nets were a bit con-
thinking of the operators whom the Signal fusing. "Is the data in the SOI," Hammond
Corps had to provide) as "now No. 1 prior- asked, "sufficient so that anyone can work
ity in the country." On 6 October he asked the nets from it?" "Will everyone," he
again about spare parts against breakage. added, "know that they have to work such
Major Thomas assured him that they were and such a station?" Major Thomas ad-
being provided. No mention was made of mitted that "it is rather confusing right
spares for the signal equipment which now, but it can be improved." 140 Yet, if these
would be mounted in Patton's signal center details were not crystal clear at the plan-
on the USS Augusta, where, as on the ning level by September's end, how could
Texas, gunfire shock would also damage the signal operators master them and when
and cripple communications.138 would they have the time? Indeed, some of
The problem of waterproofing the assault the signal units had hardly been scraped to-
radios constantly plagued Colonel Ham- gether yet, neither the men nor their equip-
mond and his staff. The signal plan had di- ment. Some, to be sure, were ready, notably
rected that "every portable radio set, com- the 1st and the 141st Armored Signal Bat-
138
talions, the men well trained, their equip-
(1) Ibid., conf, 25 Sep 42, par. la; conf, 29
139
Sep 42, par. 23; conf, 30 Sep 42, par. 10; conf, 1 Log, Hammond, Hq Task Force A conf, 6 Oct
Oct 42, par. 10; conf, 6 Oct 42, par. 6. (2) C. L. 42, par. 8; conf, 8 Oct 42, par. 13; conf, 11 Oct 42,
Stong, "Allo Maroc!" Bell Telephone Magazine par. 12; conf. 12 Oct 42, par. 6.
140
XXII (September, 1943), 151-52. Ibid., conf, 30 Sep 42, par. 15.
PREPARING FOR THE FIRST MAJOR TEST 351
ment in hand and in shape. But some were teries be charged, come 8 November?
decidedly not ready, for example, the Signal Would they be loaded on the right ships
Section Headquarters unit, Task Force A. and put ashore when and where their op-
The signal plan as printed on 3 October left erators needed them, ready and able to put
the status of this unit in limbo, putting ques- a signal on the air? These questions now
tion marks where the numbers of officers awaited the test.
and men should have appeared.141 In his The rush to ready the Western Task
morning conference on that very day Colo- Force had, of course, its counterpart in the
nel Hammond spoke of thirty-eight radio mounting of the other two North African
operators for the Signal Section Headquar- task forces in England. American and Brit-
ters; he wanted to know when they could ish troops there were preparing to leave for
be had. It was late, two weeks till time to Oran and Algiers in a fever of haste that
embark. Yet eight days later, on 11 October, matched the situation along the east coast
Hammond complained that the unit was of the United States. Much of the equip-
still "seventeen radio operators short, as of ment for the American troops staging in
last night." 142 Britain had to come directly from America,
There were uncertainties also about one consignment of radio batteries arriving
equipment in some categories: batteries for for the 1st Division by air transport. Their
example, and vehicular radios, such as absence till the last moments before sailing,
SCR-193's, mounted in jeeps or in half- Col. Terence J. Tully (Signal Officer, II
tracks. Not till 12 October did the 2d Di- Corps, staging in England) later said, "al-
vision get its batteries. On 17 October, two most wrecked the whole signal plan." His
days before the conferences ceased entirely men, moreover, had been unable to train
and the officers packed up their plans and with their sets while they lacked the bat-
departed to their transports, Colonel Ham- teries.
144
mond asked if the half-tracks with SCR- Amid the apparent confusion of routing
193's were ready yet, and would the radios
men and equipment to the dock areas, get-
work. They were ready, he was assured, "all
ting the ships, getting them loaded and
fixed up to the satisfaction of G-3." 143 But
under way, order must often have seemed
were they waterproofed, would their bat-
conspicuously absent. Units were often
141
Annex 3 to Opns Plan Hq Task Force A, 3 separated from their equipment. Indeed,
Oct 42, cited n. 134.
142
Log, Hammond, Hq Task Force A conf, 3
some of it was never loaded, or was stowed
Oct 42, par. 1; conf, 11 Oct 42, par. 16. The of-
144
ficers got busy and obtained all 38 men that day, (1) Maj William C. Frierson, Preparations
but still had to assemble them. It was reported to for TORCH, p. 63. OCMH. (2) Interv, Lt Col A.
the conference on 12 October that 13 of the 38 A. McCrary with Col Tully, Feb 43, p. 4 [p. 113].
had arrived at the assembly point, A. P. Hill Military SCIA 28, McCrary Rpts. A51-135, DRB AGO.
Reservation in Virginia, the staging area for the This is one of a group of miscellaneous folders
Hampton Roads Port of Embarkation. As for the from Plans and Operations Branch, Office of the
rest of the 38, "two operators from Camp Forrest Chief Signal Officer, containing intelligence re-
are travelling by air and should have arrived yester- ports, observers' reports, and other important docu-
day. Twenty-two of the 23 from Chicago were also ments, which were turned over to the Signal Corps
due yesterday afternoon." Ibid., conf, 12 Oct 42, Intelligence Agency (SCIA) after World War II.
par. 11. They are preserved in the Departmental Records
143
Ibid., conf, 12 Oct 42, par. 3; conf, 17 Oct Branch, AGO, under job lot A51-135, with SCIA
42, pars. 1, 2, 7. file numbers and titles added.
352 THE SIGNAL CORPS
deep in holds quite inaccessible for the first launch the invasion of hundreds of ships
landings.145 Yet sufficient order emerged to from the United States and the United
Kingdom carrying a large force of men and
145
SOS was harassed especially with late changes supplies, and to converge the two armadas
in unit assignments, or with new assignments, which
made order in the loading arrangements impos- into a mighty co-ordinated flood and dash
sible. There was the specific complaint that detach- it overwhelmingly against North Africa.
ments of the 122d Signal Company ( R I ) and the
239th Signal Company failed to receive their or- Sector) until as late as 10 October. Frierson, Prepa-
ders to embark with Task Force Blackstone (Safi rations for TORCH, p. 92.
CHAPTER XII
264-211 O - 78 - 24
354 THE SIGNAL CORPS
7
reporting to headquarters that Oran had before they engaged in actual combat.
fallen.4 Even the best troops tardily established
The lesser radios in the local radio nets signal communications, mainly because
of the invaders performed well. Colonel equipment was slow getting ashore. Some
Tully, signal officer of the II Corps, Cen- of it, notably vehicles, had simply been left
ter Task Force, reported that the first ship- behind, crowded off the transports. The
to-landing party contact was made over an decision to leave off many vehicles had been
SCR-284 operated by one of the regimen- made at the highest levels before the convoy
tal combat teams. A second contact with loading, in view of the shortage in ship-
the division headquarters ship was made by ping.8 The decision cut heavily into the
a unit of the 1st Armored Division using an supply of vehicles for all invading units, and
SCR-193.5 The 18th Infantry, part of the slowed operations in many ways. Certainly
1st Infantry Division, used SCR-511's for the lack of trucks was one big reason why
its regimental command net. The regimen- supplies in some areas could not be cleared
tal commander and each battalion com- rapidly from the docks, which became con-
mander had a set, and they were never out gested with material, in turn slowing the
of contact during the battle for Oran. rate of discharge. Some signal units arrived
Other units declared that the SCR-511, with only 25 percent of their transporta-
though good only while its batteries lasted, tion, and on D plus 13 were still short by
provided a very successful link between ship 30 percent.9
and shore.6 One consequence which arose from the
Unfortunately, signal personnel for the separation of men and their equipment, as
most part were not familiar with their equip- well as from the inability to unload them
ment. Perhaps the worst example in the quickly, was that too few message center
Center Task Force was one battalion which troops and too little communications equip-
had never been engaged in a maneuver. ment reached shore in the early assault
Thirty percent of its men were Class IV phase. In fact, at H plus 20 hours in the
and V enlisted men who had been received Oran area, only three men were ashore to
only a few days before leaving the United run the advance message center for the
States. They had no opportunity to work a American troops, and through D plus 2
single problem with all subordinate units the principal means of communication be-
tween the message center and the command
4
The SCR-299 truck and trailer came under ship were the battery-operated SCR-511
fire a few miles from La Senia. A battery of French radios. The 53d Signal Battalion landed
artillery "shot the antenna off of a set in a scout
car behind us but we were untouched. But do not on the night of D Day. But, separated from
let anyone tell you that this vehicle is not capable its equipment, the unit was unable to take
of a high speed—I can personally assure you that
it is." Ltr, Col Grant A. Williams, USA, Ret., to over the tactical net until D plus 3. A de-
Dr. G. R. Thompson, OCMH, 31 Dec 49, p. 7.
7
SigC Hist Sec File. Interv, McCrary with Tully, p. 4 [p. 113].
5 8
Interv, McCrary with Tully, Feb 43, pp. 4-5 The theater reported on 14 October that the
[pp. 113-14] SCIA File 28, McCrary Rpts. number of organizational vehicles accompanying
6
(1) Interv, McCrary with Capt R. W. Green, the inside forces had been cut in half. Leighton and
Com Officer 18th Inf Regt, 26 Feb 43, p. 2 [p. Coakley, Global Logistics and Strategy: 1940-1943,
26] SCIA File 28, McCrary Rpts. (2) Interv pp. 437-38. .
McCrary with Tully, p. 5 [p. 114]. "Interv, McCrary with Tully, p. 4 [p. 113].
COMMUNICATIONS ON THE BEACH IN NORTH AFRICA were established
through such equipment as telephone switchboard BD-71 (above) and radio SCR-284 (below)
356 THE SIGNAL CORPS
tachment went ashore in the wake of the men moved again, this time to the La Senia
assault troops and operated a small switch- airdrome. Since the telephone system there
board in a dock warehouse and another at had been severely damaged, the men at last
the French naval air station. On the 9th had a job to do. But—they had no facilities
several jeeps and radio vehicles were landed at hand. Some of their equipment, such as
and established radio communication with that shipped in their convoy from England,
the 1st Infantry Division and Combat Com- now lay scattered along the miles of landing
mand B. The battalion also took over from beaches and docks. After a time they found
the 1st Signal Company the commercial two of their trucks, which had been appro-
switchboard in the PTT (Postes, Tele- priated by other units at the time of landing.
graphes et Telephones) building. Corps Eventually, by searching daily, they recov-
headquarters was established in the local ered most of their communication equip-
school for girls but the command group re- ment.11
mained aboard HMS Largs now docked in A bright spot in the signal scene around
the port. Messenger service was maintained Oran was afforded by units assigned to the
as required. On 10 November a 53d Signal Armored Force and equipped with the new
Battalion officer and two men, while carry- FM radios in the 500 series. Colonel Wil-
ing a message to the 1st Infantry Division liams, signal officer of the 1st Armored Divi-
in the vicinity of St. Cloud, were killed by sion, reported enthusiastically: "We pro-
fire from an artillery battery.10 vided excellent communications. We even
Some signal units, such as the 32d Signal furnished communications for General Doo-
Platoon Air Base, found themselves in the little. We drove a tank up to a command
predicament of coming ashore with no post and sent his messages to the tank bat-
equipment and with no immediate prospect talion headquarters, and from there they
of getting any. Having landed at Arzeu went to the combat commander, to the II
docks, near Oran, early on 9 November, Corps to Gibraltar and it really worked.
uncertain of its assignment, the unit Toward readying portable radios for the
marched to St. Leu, six miles distant, to landing," Williams commented "we made
report to the headquarters of the XII bags out of heavy shower proof canvas with
Air Force Service Command. They were a draw string at the top and made handles
ordered to wait in a field nearby. There at the sides. . . . We even devised a spe-
they camped during 9 and 10 November in cial antenna so that the equipment would
a cold rain with but one blanket and a operate while it was being carried. We used
shelter half to a man. On the llth, under these small radio sets until the vehicles ar-
orders from the headquarters, the men rived and as soon as the latter landed, we
moved to the Tafaroui air base. They ar- sent them inland and established tactical
rived by evening, only to have their con- communications." He added that the SCR-
fusion compounded, for no one at the base 509's were used to exchange messages per-
knew what to do with the orphan unit. On taining to unloading the ships.12
the following day, receiving orders from the 11
History of the 1032d Signal Company Service
signal officer of the Twelfth Air Force, the Group. AF Archives Sig 1032-HI, 6621-50.
12
Interv, McCrary with Williams, CofS 1st Arm-
10
(1) Ibid., p. 5 [p. 114]. (2) History of the 53d ored Div, 24-25 Feb 43, p. 1 [p. 6] SCIA File 28,
Signal Battalion, p. 6. McCrary Rpts.
THE TEST AT ISSUE IN NORTH AFRICA 357
The Signal Corps unit serving the 1st enced troops. In general, communications
Armored Division was the 141st Armored were not quite so good during the assault
Signal Company. Twenty men of the 141st upon Oran but, on the whole, the signal
made up the beach signal party. Disem- plan for the Center Task Force met the
barking onto an LCP about 0230, 8 No- test rather well.
vember, they took six SCR-509's, six EE-8 By contrast, communications in the West-
telephone sets and a quantity of assault wire ern Task Force area fell short of the plans,
to the beach. There they established contact even broke down at times. This was the case
with a 509 radio and its two operators who in General Patton's headquarters, the Army
had remained at the headquarters aboard message center aboard the heavy cruiser,
the transport, and they set up lateral wire USS Augusta. The Signal Corps conse-
lines along the beach to adjacent troops. quently received some scathing criticism. "A
Their first vehicular signal center ashore glaring deficiency," read an official report
sprang up around an SCR-193, which had on TORCH, "was the almost complete break-
been brought in by dawn to establish com- down of communication in certain in-
munication with a British radio, a No. 19 stances. . . ." 15
set, aboard the headquarters ship. "During The ships of the Western Task Force
the landing and in the action which followed steamed within gunshot of the Atlantic
in taking Oran, the communications of the littoral of French Morocco at three points:
invasion force were of the highest order," off Port-Lyautey, about seventy-five miles
the historian of the company congratulated northeast of Casablanca; off Fedala, the
its men. "Radio nets," he added, "were beach resort of Casablanca itself (Casa-
established without much difficulty, signals blanca harbor held dangerously strong units
were good, contact was maintained of the French Navy); and off Safi, well
throughout the whole battle which lasted over a hundred miles down the coast, south-
for three days." 13 west from Casablanca. Throughout its voy-
This unit was undoubtedly one of the
age, the armada had observed strict radio
best signal outfits in the Army, including as
silence to avoid giving notice of its ap-
it did many a radio enthusiast, beginning
with Grant Williams himself, who was the
proach. But before the zero hour, 0400,
commanding officer when the unit first took when the first landing craft were scheduled
form in 1940 as the 7th Signal Troop, soon to touch shore, a short-wave news an-
redesignated the 47th Signal Company. It nouncement from Washington, heard over
was during the formative period of this receivers aboard the ships, reported to the
signal unit that Williams did much to mod- world that American troops were landing
ernize vehicular radio, promoting FM on the west coast of Africa. City lights and
crystal-controlled sets, especially for the Ar- lighthouse beacons which had been shin-
14
mored Force. The service provided by this ing along the shore suddenly blacked out.16
crack unit suggested how effective commu-
15
nications could be in the hands of experi- Hq SOS Rpt, Lessons Learned from Recent
Amphibious Operations in North Africa, 12 Feb 43.
13
History of the 141st Armored Signal Com- Appendixes to Preparations for TORCH. OCMH.
16
pany, 18 June 1940-20 May 1943, pp. 20-21. (1) Incl, Brig Gen A. R. Wilson, Report on
SigC Hist Sec File, A46-160, Drawer 15. Operations in North Africa, with Memo, Wilson for
14
Terrett, The Emergency, pp. 139, 145. CofS, 12 Dec 42, pp. 2, 4. OPD 381 TH (12 Dec
358 THE SIGNAL CORPS
Now transmitters were turned on, as where General Eisenhower and his staff
guide boats and landing craft left the dark- awaited the news that morning, was a de-
ened ships lying offshore and headed for tachment of one officer and forty enlisted
the beaches. One powerful transmitter in men from the Headquarters Company, 63d
particular went on the air at 0630, the five- Signal Battalion, and a detachment from
kilowatt set aboard the Texas, speaking the the 827th Signal Service Company, flown
recorded words of President Roosevelt, ask- in from England, ETOUSA, the night be-
ing that the Americans be received as fore, together with British signalmen.20 Re-
friends and liberators. Despite much skep- ports filtered in scantily, according to Col.
ticism the signal plan of the Western Task Darryl F. Zanuck, who was on hand to
Force had included a psychological unit, supervise Signal Corps photographic activi-
its advocates having pushed it with the ties: "Battles are raging, and we seem to
highest priority. Subsequent reports from be in control of most of Algiers and Oran,
the French revealed that many listeners but the Casablanca theater is ominously
thought the Allies had already landed and silent," he jotted in his diary. The next
taken over the radio station at Rabat.17 morning, just before taking off in a trans-
Certainly it is true that the French did not port plane for Algiers, he noted, "Communi-
resist determinedly or for long, and "from cations are still difficult." 21 Zanuck arrived
that time on, there was no major Allied in Algiers just after the airport had been se-
landing from Normandy to the Philippines cured. His first assignment there was to oc-
that did not have a Psychological Warfare cupy and close down a radio station in the
Division as part of the force." 18 When the city. Existing radio stations were naturally
Texas fired her big guns in support of the immediate objectives for Signal Corps units.
invasion,
m the iblastst knocked
t out
e the rtrans-, A small detachment of the 9th Signal b u t iCom-
t w a s soon r
pany, attached to the 39th Combat Team,
19
back on the air. had gone ashore in the early morning of 8
On duty in the signal center at the AFHQ November with the first wave of invaders,
advanced command post in Gibraltar, landing at Surcouf near Algiers. Ashore at
0200, by 0700 they had reached and seized
4 2 ) , Drawer 1219. (2) Brief of Action Which Took the important Radio Algiers and its power-
Place at Medhia-Port-Lyautey, n.d., attached to ful transmitter at Eucalyptus.22
TORCH Action Report, 3 Dec 42. OPD 381 TORCH
Sec. II, Item. 88. Difficult was a mild word to describe
General Patton, commander of the Western Task
20
Force, angrily regarded the broadcast as prema- (1) Capt Sidney L. Jackson, Tactical Com-
ture. Robert E. Sherwood, Roosevelt and Hopkins: munication in World War II, Pt. I, Signal Com-
An Intimate History (rev. ed.; New York: Harper munication in the North African Campaigns (1945),
& Brothers, 1950), p. 650. SigC historical monograph E-3a, p. 11. SigC Hist
17
(1) C. L. Stong, "Allo Maroc!" Bell Telephone Sec File. (2) Sig Sec AFHQ, History of the Signal
Magazine, XXII (September, 1943), 149ff. (2) Section, Allied Force Headquarters, 24 July 1942-
Brief of Action cited n. 1 6 ( 2 ) . (3) Incl with 10 November 1945 (1945), p. 16. SigC Hist Sec
OCSigO R&W Action 1, Don W. Moore, SPSAY, File, A47-200, Drawer 15.
21
to Mil Intel Br, 23 Feb 43, sub: Material for US W Darryl F. Zanuck, Tunis Expedition (New
Patterson. SigC AY-18. York: Random House, 1943), pp. 34, 38.
18 22
Sherwood, Roosevelt and Hopkins, p. 630. (1) Ibid., pp. 50-55. (2) Campaigns, The
19
Summary of Signal Communications at Casa- Battle of Algiers, History of the 9th Signal Com-
blanca (hereafter cited as West Coast Landings). pany, 1 August 1940-1 October 1943. SigC Hist
North Africa Folder 2, p. 8, SigC Hist Sec File. Sec File, A46-160, Drawer 15.
THE TEST AT ISSUE IN NORTH AFRICA 359
24
what was happening meanwhile at Patton's operative. Since the circuits were the prin-
headquarters aboard the Western Task cipal means of communication with the sub-
Force's warship, the Augusta, flagship of task force and General Eisenhower's head-
Rear Adm. Henry K. Hewitt's naval com- quarters, all echelons of command were left
mand. It had seemed best to the planners with very little information concerning the
to set up a single combined message center progress of the invasion. The only messages
which, during the amphibious assault, to reach AFHQ were sent by the Navy, but
would handle all headquarters traffic: U.S. naval radio channels were so congested that
Army, U.S. Navy, and British Navy. The the traffic moved slowly.
radio equipment, together with the message Finally, after repairs had restored the
center coding and distribution facilities, transmitter aboard the Augusta and traffic
could not be compressed into one room, again flowed over the tactical net, the mes-
and so was put into three widely separated sages were found to be worthless. They had
locations spread over the crowded ship. The been improperly enciphered. As for the ad-
main room, Radio One, held jammed into ministrative net centered in the control sta-
its 300 or so square feet 11 radio receivers, tion aboard the Augusta, it fared no better
3 cipher machines, and other equipment, than the ill-starred tactical net. Its operators
along with 25 operators.23 The Army tacti- were likewise below par, and its equipment
cal and administrative radio nets had to be also had suffered from gun shock. Accom-
controlled from the flagship until Patton's plishments on D Day were next to nil. The
headquarters could go ashore. They re- operators did keep a log, which revealed
quired two channels emanating from the net upon subsequent examination that, while
control centers on the Augusta. These Army
the subordinate stations in the net had called
control centers, it had been planned, would
in periodically, the headquarters had failed
be operated by 9 Army radiomen, using
naval equipment. But the 9 men, evidently 24
Hammond, "Signals for Patton," Signals I I : 1 ,
from among the very ones whom Colonel 7. General Patton subsequently wrote that " . . . a
Hammond had assembled during the last special command ship with adequate naval and
military equipment is a paramount consideration
frantic days in Washington, proved to be too for future operations. This ship must not be capable
green. Their training insufficient, they had of engaging in battle." Extracts of Signal Commu-
to be relieved, presumably by naval opera- nications Items from Reports on Lessons from Oper-
ation TORCH, remarks of Gen Patton to CG Allied
tors, before noon of D Day. Force, 30 Dec 42, p. 1. North Africa Folder 2, SigC
It was not till afternoon, therefore, that Hist Sec File.
communications were established over the This very same lesson had to be relearned in the
Pacific, during the assault on Tarawa, late in 1943.
tactical net to all sectors ashore. Further mis- The battleship Maryland carried the communica-
fortune ensued. The tardily accomplished tion center for the Marine assault. Her radios, in-
contact was cut short, two hours later, when adequate and crowded, went dead when the ship's
heavy guns fired salvos. The consequences here were
the Augusta's heavy guns fired on French much more costly than they had been in the West-
warships off Casablanca. The shock knocked ern Task Force in November 1942. Thereafter, the
out the transmitter and rendered practi- Navy provided special communication ships for
subsequent amphibious assaults in the Pacific. J. A.
cally all radio circuits on the Augusta in- Isely and Philip A. Crowl, The U.S. Marines and
Amphibious War: Its Theory and Its Practice in the
23
Jackson, Tactical Communication in World Pacific (Princeton: Princeton University Press,
War II, Pt. I, pp. 16-18. 1951), p. 216.
360 THE SIGNAL CORPS
to answer. Late in the first day the opera- with Gibraltar and Oran, and with the
tors even intercepted a French message in Western Task Force elements. But only the
plain text, describing the damage done in local Western Task Force channels actually
Casablanca and recounting French battery performed at first, and not till the third day
counterfire. They recorded the message, but after the invasion did one of the other two
23 28
failed to report it. Gradually, matters sets establish a contact with Oran.
aboard the Augusta mended, until by the The smaller radio sets, the SCR-511's
end of the second day the Army's tactical and the 284's, and the larger 193's served
net in the Western Task Force was perform- less well in the western landings because
ing well.26 But obviously during the cru- of the seas and surf, which, many had
cial first hours, there had indeed been a thought, would utterly prevent amphib-
"glaring deficiency" here. ious operations along western Morocco
Communications on the beachheads were and which were indeed rough enough to
only a little better than those aboard the capsize landing boats in some areas. Water-
Augusta. The planners had pinned much proof bags, as ordered in the Signal Operat-
hope upon the large SCR-299 radios. They ing Instructions, had not been distributed
had assigned six, specially mounted upon for all sets. When soused in sea water, the
half-tracks, to the 1st Armored Signal Bat- power supply cords and contacts shorted
talion. But the battalion landed only one in and the radios died. Jeeps plunged into sev-
time to be of any use in the landing opera- eral feet of surf, soaking the 193's. On
tion, and that one not until 10 November, shore, although half-tracks carrying radios
when it took over the Western Task Force were able to get through, the radio trucks
command net. Five of the six sets had been themselves slithered helplessly in the sand.
loaded deep in one vessel. The sixth set was In at least one instance a radio vehicle was
lost with the sinking of the ship that carried wrecked by French strafing from the air.29
27
it. Because of the lack of the 299's on the Some portable sets worked well, notably
beaches, the secondary Western Task Force at Safi, on the southwest flank of the west-
net contemplated in the plans was never ern assaults. Of all the landings in western
established during the assault. A detach- Morocco that morning, the operation
ment of Company C, 829th Signal Service 28
Battalion, eventually succeeded in putting (1) Jackson, Tactical Communication in World
War II, Pt. I, pp. 19, 70. (2) Ltr. Col Hammond,
six large sets on shore: three SCR-188's and Sig Officer I Armored Corps, to CSigO, 11 Jan 43,
three SCR-299's. Of the three 188's, in- sub: Rpt of Opn TORCH, 8-11 Nov 42. North Africa
tended, according to the plan, to establish Folder
29
2, SigC Hist Sec File.
(1) West Coast Landings, pp. 7, 10. (2) Mc-
contacts with Accra, Oran, and Gibraltar, Crary, Answers to Questions Obtained in Atlantic
only the contact with Gibraltar met success, Base Section, No. 39, p. 10, and Answers by Major
and that success was considerably dashed by Pickett to Questions, No. 4; [pp. 57, 86, respec-
tively] SCIA File 28, McCrary Rpts. (3) Jackson,
enemy jamming. The three 299's fared no Tactical Communication in World War II, Pt. I,
better. They were intended to communicate p. 27.
A year later the Navy and the Marine Corps in
25
West Uoast Landings, pp. 6-7. the Pacific, participating in the assault on Tarawa,
26
Ibid., pp. 4-6, 8. experienced the same communication difficulties,
27
Lt Col A. A. McCrary, Answers to Question- especially water-soaked radios going dead at the
naires Obtained in Atlantic Base Section, p. 15 [p. time they were needed most. Isely and Crowl, The
62] SCIA File 28, McCrary Rpts. U.S. Marines in Amphibious War, pp. 251-52.
THE TEST AT ISSUE IN NORTH AFRICA 361
against Safi was the smallest and the most use the Infantry AM radio sets according
successful, taking its objective with effec- to the signal plan and to establish the au-
tive surprise and efficiency. A pair of SCR- thorized AM nets. But they failed. For one
511's and an unauthorized FM net pro- thing, they were unable to keep the sets
vided valuable assistance. Two destroyers properly tuned (both the 284 and the 193
laden with troops headed for the harbor, to required manual tuning). Armored Force
land men at the very docks. A scout boat men had their own pushbutton FM radios
had gone before them to locate the dark- and turned to them, setting up an unauthor-
ened harbor entrance and then to flash an ized FM net of four SCR-509's: one for
infrared light seaward to guide in the each battalion commander, one for the sub-
destroyers' skippers. It was a guide light task force commander, and one for the
invisible to the unaided eye. To Safi transport division commander. This net
citizens or guards it yielded no telltale worked with the simplicity and clarity of
gleam, but through the infrared telescopes of FM radiotelephone operation, employing
the watchers on the first destroyer it shone pushbuttons to select the correct frequen-
brightly. The ship gained the harbor en- cies. It actually handled "the bulk of the
trance safely, then ran aground, yet in a radio traffic in this operation for a period
sufficiently advantageous position so that of three days," allowing good communica-
her troops were able to land promptly over tion up to eleven miles and handling local
the bow. The watchers aboard the second requests for fire or air support without a
destroyer, however, failed to see the infra- hitch.31
red guide light, and their ship was heading Safi was the one bright spot in the com-
toward the harbor's breakwater when the munication scene along the coast of western
scout boat party hastily turned on a radio Morocco on 8 November. Elsewhere, the
which they had brought with them, an adverse circumstances which harassed the
SCR-511. With it they at once made con- Center Task Force recurred in the west:
tact with another 511 on the destroyer and signalmen without equipment, equipment
gave warning just in time to avert a disaster inaccessible under layers of other supplies
on the breakwater's rocks. They then talked still aboard the ships or scattered at land-
the ship into the harbor where it docked ings far removed from the units to which
without incident.30 it belonged. These difficulties were com-
The communication radio nets which pounded in the west by the rough wet land-
were intended, according to the plan, to ings, overturned craft, and considerable op-
serve the landing effort locally were AM, position from the French. Not only did
utilizing SCR-511's, 284's, 536's, and 193's, equipment lie at the bottom of holds, not
the usual Infantry radios of that date. But being discharged till many hours or days
at Safi the actuality differed. Most of the after the initial need for it, but some of it
radio communications passed over an ex- was not unpacked at all. It remained in the
temporized FM radio net, based on Ar-
mored Force sets. Armored Force units of 31
(1) Jackson, Tactical Communication in World
the 2d Armored Division participated in the War II, Pt. I, pp. 21-22. (2) Extracts of Signal
Communications Items from Reports on Lessons
assault on Safi. The men tried at first to from Operation TORCH, extracted from the report
of Hq 2d Armored Div, pp. 1-2. North Africa
30
West Coast Landings, p. 5. Folder 2, SigC Hist Sec File.
362 THE SIGNAL CORPS
holds of ships that returned to the United cation with the front lines and Truscott
States to meet convoy schedules, since dock- visited the front himself to find out how
side congestion and other factors had de- affairs were progressing. Many small port-
layed unloading too long. This happened able radios had come ashore drenched and
to some of the heavier signal equipment, quite dead. The same was true of vehicular
notably the radar sets intended for a num- sets.
34
ber of the Aircraft Warning Service bat- A detachment of about seventy officers
talions assigned to the Army Air Forces. and men from the 9th Signal Company
Other radars, too, were sunk when several landed at Mehdia, a village near Port-
ships, still laden with cargo some days after
Lyautey. Coming ashore with the third
D Day, were torpedoed off Morocco. They
wave of the 2d battalion, 60th Infantry,
carried down quantities of valuable radar
equipment.32 some of the men served on signal liaison
Even when the troops in the western duty at the village throughout the first day.
assault could lay hands on their signal That night they received orders to form
equipment, they often found it damaged, an outpost on high ground guarding the
watersoaked, or out of operating condition, battalion's left flank. Dawn of the next day
alignment off and batteries low.33 These dif- found them outflanked by Moroccan sol-
ficulties were intensified as they were not at diers. Attacked from the rear, the signal
Oran and Algiers, by very considerable op- group suffered losses of six men killed and
position, especially at Port-Lyautey on the two wounded. Consolidating during the
northeast flank. Here there was fighting and day in the village and reinforced, by the
not much communications the first two afternoon they established a radio contact
days. General Truscott and his staff, though with the ships offshore. By 10 November,
they had planned to go ashore at 0600 on 8 as more men and equipment landed, they
November, delayed until some sort of com- built up communications ashore for this sub-
munications had been set up on the beach. task force.35 Here, then, these Signal Corps
They did not disembark until 1340. On the men served as infantry. Here, too, another
beach there was still almost no communi- signal unit, the 2d Broadcast Station Op-
eration Detachment, did everything but op-
32
Interv, SigC Hist Sec with Col Lenzner, 5 Jul erate a broadcast station. First, they un-
44. SigC Hist Sec File. According to General
Matejka, another ship with sixty tons of vitally loaded ammunition and threaded machine
needed equipment, whether radar or not he did not
34
say, "was sent back to New York with the convoy Initially at Port-Lyautey, "All ship-to-shore
since it was not unloaded in time for the sailing of communications failed." Memo, Gen Wilson for
the convoy on the return trip." Agenda A, Incl with ACofS Opns Div, 1 Jan 43, sub: Brief of rpt of
Ltr, Col Hobart R. Yeager to CG AAF, 12 Jun 43, opns in North Africa, p. 4. OPD File 381 TORCH,
sub: Rpt of visit of Col Yeager, Air Corps, to Sec. IV, Item 95.
35
NATO, Ninth Air Force, and ETO 6 Apr 43 to 7 (1) Jackson, Tactical Communication in
Jun 43. SCIA File 75, Yeager Rpt. World War II, Pt. I, pp. 20-21. (2) Campaigns,
33
Packing cases broke, spewing out spare bat- The Battle of Port-Lyautey, History of the 9th Sig-
teries. Paper cartons containing the valuable Hag- nal Company, 1 Aug 40-1 Oct 43. SigC Hist Sec
lin cipher devices, M-209's, disintegrated in the File, A46-160, Drawer 15. (3) Interv, SigC Hist
spray and rain, which corroded the delicate mech- Sec with Maj John C. Liggett (formerly Sig Offi-
anisms. Ltr, Hammond, Report of Operation cer of 9th Sig Co in the North African Opn), 19
TORCH, 11 Jan 43, p. 5. Jan 45. SigC Hist Sec File.
THE TEST AT ISSUE IN NORTH AFRICA 363
gun belts; then they served variously, on land. The SCR-299, originally conceived
burial detail, on guard detail, on baggage as a radiotelephone good for "100 miles in
39
detail. Not until 20 November did they motion," proved to have surprisingly long
turn to their specialty, when they took over ranges, in the hundreds and thousands of
the operation of Radio Maroc, the large miles when used in radiotelegraph opera-
official Moroccan radio at Rabat.36 tion on sky waves radiated from the usual
whip antenna or from a directional antenna
Stabilizing TORCH Communications array which could be set up quickly in any
more or less fixed situation. So it was that
Communications for the AFHQ quickly here, in Oran, an SCR-299 maintained
became established in Algiers. An advanced contact over the long distance to England,
echelon moved in with the Eastern Task with little atmospheric interruption, until
Force on 8 November, followed by a second the Signal Corps replaced the set with a
group of signalmen the next day. Maj. Kirk permanent 15-kilowatt 40
fixed station in De-
Buchak, General Matejka's administrative
cember 1942.
During the days and weeks following the
officer, at once pressed French fixed radios
Allied invasion of North Africa, the SCR-
into service to supplement and then replace
299's provided the chief means of long-
the temporary channels which had been set
range communications. They operated over
up by the British communications ship,
distances up to 2,300 miles, Colonel Tully
HMS Bulolo, anchored in Algiers Bay.
reported enthusiastically. His sets at Oran
Company A of the 829th Signal Service Bat-
made contact with Gibraltar on 9 Novem-
talion, a detachment of the 63d Signal Bat-
ber, with Algiers on the llth, with Casa-
talion, and the 365th Independent Signal
blanca on the 12th, with Accra on the 17th,
Battalion (British) soon converted the
and with England on the 21st.41 "The SCR-
garages, the servants' quarters, the wine cel-
299 is far and away the best field radio
lars, and the barroom of the St. George
equipment in the theater," reported Maj.
Hotel in Algiers into the AFHQ Signal
Lawrence C. Sheetz, adding that "this is
Center.37
the unanimous opinion of all British and
Signal Corps' big mobile SCR-299 radio
American officers. . . . " Stating that the
sets now began to weave a dependable com-
299 performance exceeded all expectations,
munication net over the entire sweep of the
he cited the fact that one set at Oran, using
TORCH invasions. The sets served as excel-
only its normal whip antenna, was main-
lent stopgaps ashore till permanent ACAN
38 taining contact both with England far to the
radios could be installed. In the Oran area
an SCR-299, which Company B of the 39
So General Olmstead had conceived it and so
829th Signal Service Battalion put into op- it had been termed as a laboratory project. Ter-
eration, established a direct channel to Eng- rett, Interv,
The Emergency, pp. 161-62.
40
SigC Hist Sec with Capt Joseph E.
Sweets (formerly Sig Officer of Co B, 829th Sig
36
History of the 2d Broadcast Station Opera- Sv Bn in the North African Opn), 29 Feb 44.
tion Detachment, pp. 3-4. SigC Hist Sec File, A46- SigC Hist Sec File.
41
160, Drawer 15. Ltr, Col Tully, II Corps Sig Officer, to Olm-
37
Hist Sig Sec AFHQ, pp. 8, 17-19. stead 9 Apr 43, sub: Use of SCR-299's. SCIA
38
See below, pp. 452ff. File 23, Tully Rpts, 1.
364 THE SIGNAL CORPS
north and with Accra, even farther to the of absorbing the training, were further be-
south.42 deviled by the fact that they had not been
But good equipment could not by itself informed about the call signs for the many
ensure good communications. Not until D stations. Codes and ciphers entangled and
plus 10 could the radio service connecting snarled. Capping the whole confusion was
Casablanca, Gibraltar, Oran, and Algiers the fact that changes had been made in the
be considered really satisfactory and de- radio procedure plan at the last moment
pendable. The delay stemmed from the men before the invasion, and not everyone had
and the methods. Signal Corps men who been informed. The men had to learn the
had to communicate in radio nets with the tricks and adjust to the situation as they
British Army, the British Navy, the Royal struggled with their task.43
Air Force, and the American Air Forces en- Radio bore the brunt of the initial com-
countered almost insuperable difficulties in munications. Thereafter, as wire facilities
coding and decoding and in relaying and built up, they took over from radio an in-
routing the traffic. Message center person- creasingly heavy share of the traffic. But
nel, too few, too inexperienced, poorly even from the first moments of landing, wire
trained or in some cases even incapable played a large part. Signal Corps wire units
42
Incl Memo, Sheetz for CSigO, 18 Jan 43, sub: rushed in with their equipment alongside
Rpt on observations on North African Sig matters, 43
p. 3, with Ltr, Sheetz to CSigO, 21 Jan 43, same Jackson, Tactical Communication in World
sub. North Africa Folder 1, SigC Hist Sec File. War II, Pt. I, pp. 44-45.
THE TEST AT ISSUE IN NORTH AFRICA 365
the first infantrymen. In the Oran area, two in the area, besides establishing teletype serv-
six-man teams of the 286th Signal Com- ice to AFHQ in Algiers, to the Western
pany, Composite, landed at 0100, 8 Novem- Task Force in Casablanca, to the Air Forces
ber, with the 1st and 3d Battalions of the net, and to naval stations in the dock area.45
16th Regimental Combat Team and estab- In the Casablanca area, the 239th Sig-
lished wire circuits to the battalion com- nal Operation Company established wire
mand posts as well as local circuits in the communications quickly, thanks to the
beach area. At 0430 two officers and fifteen French, whose help was badly needed. The
enlisted men landed with the headquarters Americans had received insufficient coach-
of the 16th Regimental Combat Team and ing about the French-type telephone ex-
laid a local wire net for the temporary beach changes, the French wire circuits, and out-
posts. side construction. "If the French had not
Hardly had these temporary, local lines been co-operative," said Capt. Herman L.
been installed than the Signal Corps men Purkhiser, commander of the 239th, "we
began to make use of existing French facili- would have had a great deal of difficulty
ties, such as pole lines which ran a bit inland operating the system." As for the wire units
and parallel to the shore. These were tapped sent to North Africa, Purkhiser thought
by beach parties of the 141st Armored Sig- their organization was good, their equip-
nal Company in order to duplicate the lat- ment excellent. The only large inadequacy
erals along the beach itself. The French sys- upon which he remarked, as did all other
tem had a two-position switchboard in signal reports, was the insufficient training
Arzeu, which the 1st Signal Company took of the men.46 But they would learn, on the
over the first day. Later they transferred its job.
operation to the 53d Signal Battalion. By The first test posed by TORCH, the as-
D plus 3, the 53d assumed control over the sault phase, concluded with the French sur-
entire telephone system of Oran and, by the render on 11 November. Whatever the spe-
day after, established telephone links over cific failures, the assault had succeeded. The
PTT facilities with Algiers and Casablanca. Signal Corps men, their organization, and
They set up Army equipment too, as fast as their equipment had met the first test at
they could get it, for example, a BD-96 least reasonably well in view of the circum-
which they placed in the PTT building. stances. Such signal failures as occurred
Within forty-eight hours after the landings, were by no means the fault solely of the Sig-
the Gibraltar and Algiers cables were in
nal Corps. In a post-mortem dated in Feb-
use, as well as a cable link to Vichy, whence
ruary 1943, the Services of Supply head-
the Americans received a number of cable
quarters made emphatic some of the points
messages from the Vichy French govern-
44 which the Army had learned from TORCH :
ment and turned them over to G-2. The
plans must be begun earlier in anticipation
53d Signal Battalion set up the Center Task
of an assault; men and material must be
Force signal center in the Grand Hotel,
Oran, and was soon serving about 100 units 45
History of the 53d Signal Battalion, p. 7.
46
McCrary, Answers to Questionnaire Obtained
44
(1) Ibid., pp. 45-45A. (2) Interv, McCrary in Atlantic Base Section, No. 11, p. 5, and Answers
with Tully, p. 5 [p. 114] SCIA File 28, McCrary on Organization, No. 5, p. 2 [pp. 52 and 67, re-
Rpts. spectively] SCIA File 28, McCrary Rpts.
RESTORATION OF COMMUNICATIONS FACILITIES was aided greatly by
French co-operation. French telephone cable is loaded on a charcoal-burning French truck
(above), and French telephone operators assist American operators on a switchboard (below)
THE TEST AT ISSUE IN NORTH AFRICA 367
carefully selected and assembled; above all, without bases immediately behind and far-
the men must be trained, not just in their ther behind, and these require huge commu-
specialties, but in the added refinements of nication nets. "An Army needs a virtual
amphibious operation such as techniques of AT&T system," said Maj. Gen. Francis H.
loading and discharging the convoys. In Lanahan, Jr., after the war, "to carry huge
particular, the SOS spotlighted the need for and complex administrative traffic—hos-
improved communications between armies, pitals, convoys, depots, transportation, press,
between the Army and the Navy, and personnel."48 Further, as the fighting units
among the Allies. This meant, first, agree- move forward, taking along their tactical
ment at top levels on equipment, frequen- communications, they can rarely afford to
cies, call signs, codes and ciphers, and pro- leave a signals vacuum behind them. The
cedures in radio and wire operation; and terrain they have won must be laced with
second, selection of competent operators heavy-duty communication facilities. All
and the training of them somewhat longer this had been foreseen by the Signal Corps,
than overnight. "It is the responsibility of whose research and development workers
every person in the military service," SOS di- had readied military carrier systems and
rected, "to take such action as lies within spiral-four field cable.
his power to insure that none of the lessons But the Army in North Africa was not
derived from the recent amphibious opera- yet ready to use such equipment. The Army
tions in North Africa shall go unheeded." had scarcely heard of it, had received no
Other landings lay ahead, far more danger- training in its use, and would have to be
ous. The Allies had been lucky in North trained on the spot. The need was immedi-
Africa.47 ate and dire, in direct proportion to the
speed with which the troops advanced from
New Developments in Combat Casablanca, Oran, and Algiers, eastward
Communications along the coast to Philippeville and Bone,
inland to Constantine, and southeastward
Communications in war immediately to Tebessa, in order to grapple with the
suggest tactical command messages, officers Germans in Tunisia. Movement was rapid,
taking and giving orders, commanders re- distances were great, and existing French
ceiving information and directing their wire lines were in poor condition, totally
forces. Although the cutting edge of war- inadequate to handle the large volume of
time signals, for which the whole Signal messages that had to go through.
Corps exists, this is only a small part of the TORCH planners had already ordered
whole. It is sometimes less than 10 percent huge quantities of commercial-type carrier-
of the communications load in a theater of wire equipment to implement the A to H
operations. The front cannot move forward project, contemplating an extensive, open-
wire system for the Allies across great
47
Hq SOS Rpt Lessons Learned from Recent lengths of North Africa, first to Algiers and
Amphibious Operations in North Africa, 12 Feb then to Tunis. Carrier facilities would be
43. Appendixes to Preparations for "TORCH."
OCMH. A similar report, in great detail (14 necessary to provide enough circuits. Gen-
pages), is contained in Ltr, Maj Gen W. B. Smith
48
to CCS, 19 Feb 43, sub: Sig com of Opn X. SigC Interv, SigC Hist Sec with Gen Lanahan, CG
676 Gen Opn X. Ft. Monmouth, 10 Feb 50, p. 3.
368 THE SIGNAL CORPS
eral Matejka subsequently pointed out that, Matejka had realized that the Army must
after the Tunisia Campaign, the prepara- have something that could be installed more
tions for the invasion into Sicily required 32 quickly, and in December 1942 he had or-
circuits alone between Constantine and dered large quantities of spiral-four, rapid-
Tunis. Already, by February 1943, the A to pole-line and military carrier equipment.
H equipment had all been shipped, having Early in the year the quantities had begun
gone out in three lots, dispatched in No- to arrive, jamming the base sections and
vember, December, and January, along overwhelming depot personnel, who did not
with Signal Corps units to install it, the 27th, understand what the material was, or how
the 28th, the 63d, and the 251st Construc- to handle or issue it. Only little by little did
tion Battalions. In March Colonel Lan- it filter down to the troops, and then often
ahan itemized the fixed-wire equipment in a damaged condition. Moreover, neither
which had been shipped, such as Western the troops nor their signal officers appre-
Electric switchboards so big that each re- ciated its use. A British expedient called
quired eight operators, quantities of C type multiairline (MAL) equipment saved the
commercial carrier terminal equipment, and tactical communication situation, reported
pole line material sufficient for 500 miles,
one Signal Corps officer, at a time when
averaging ten wires. Then came orders for
"the acute shortages of circuits in the area
1,350 miles of pole line material, weighing
thousands of tons.49 behind Army Headquarters, then near Con-
All of this was heavy-duty, ponderous stantine, became the principal problem
wire equipment which simply could not be confronting the Chief Signal Officer
installed rapidly enough. As late as April, [Matejka]."51
when the Tunisia Campaign was in its Both the British MAL and the American
last weeks, General Matejka reported that rapid-pole-line, RPL, were expedients de-
the only long-distance trunk circuits in use vised for a nearly treeless land where tele-
by the Army from Casablanca to the east- phone poles could not be obtained locally.
ern boundary of the Tunisian battlefields Standard 40-foot poles by the thousands
50
were French lines. Long before this were forbiddingly awkward and bulky to
49
transport to North Africa. Hence RPL had
(1) Incl, Signal Communication Talk by Brig
Gen Jerry V. Matejka to Members of the Army been devised. The poles were 20-foot build-
Navy Staff College on 19 August 1943, p. 11, ing studs, or 2 x 4's; that is, they were tim-
with Ltr, Capt J. S. Walter, Intel Br, to Lt Col
Mason, Pers and Tng Sv, 7 Oct 43. SCIA File 13,
bers sawed two inches thick by four inches
Matejka Rpts. (2) Memo, C. B. Riggs for Chief of wide. Two of them could be nailed together
War Plans Br, 22 Feb 43, sub: Present status of to form a 4 x 4-inch substitute for a pole
projs for NATO; (3) Memo, Riggs for Rcd, 18
Feb 43, sub: Sig const units for NATO. SigC or they could be crossed to form an X-
EO-4-9 (475) Equip and Movement Order shaped support. Naturally, they were easy
NATO, 1942-43. (4) Memo, Col Lanahan, Dir
of Plan, for CSigO, 9 Mar 43, sub: Rpt on Sig to handle and could be packed neatly for
matters in NATO. North Africa Folder 2, SigC
51
Hist Sec File. Memo, Maj M. M. Bower for CSigO, 10 Aug
50
Incl, Matejka, Answers to Questions, with Ltr, 43, sub: Rpt of special mission to North Africa
Matejka to CSigO, 18 Apr 43, sub: Questions de- to introduce spiral-four cable carrier and tempo-
sired answered by OCSigO, p. 5. SCIA File 13, rary pole line equip, p. 2. North Africa Folder 1,
Matejka Rpts. SigC Hist Sec File.
THE TEST AT ISSUE IN NORTH AFRICA 369
transport, but they were expected to hold in the previous summer. The AFHQ had
up standard crossarms, insulators, and hard- ordered it in quantities, but the sad truth
ware, which proved too heavy for them. was that no one in the field understood its
Moreover, they had to be spaced twice as use. When an early shipment of 2,000 miles
close as standard tree-type poles, every 150 of spiral-four arrived in North Africa early
feet instead of every 300. Since this doubled in 1943, it came without instructions or
the quantity of crossarms and fixtures, the explanations. Supply officers simply placed
number of holes to be dug, and the instal- it in depot stock and issued it as long-range
54
lation time, rapid-pole-line turned out to field wire to all comers. And as field wire
be not so very rapid. Moreover, the studs the signal officers and wire crews at first
twisted and warped under sun and rain and treated the cable, generally mishandling it
not infrequently broke or blew over. Con- so badly that many concluded this new
sequently, RPL was not altogether a success. "wire" was worthless. They tugged and
"In construction in this area," said a Sig- yanked it and hung it on poles in great
nal Corps officer speaking of North Africa,
long festoons, as often as not with a con-
"it was found that a construction platoon
nector joint in mid-span. Under the stress
could set up approximately 5 miles of RPL
of weight and wind, the connectors fre-
a day, and 8 miles of standard pole line a
day, and, of course, the latter is much easier quently failed and the manufacturer's
to maintain." 52 A substantial amount of splices within the cable parted.55 Colonel
RPL was used in North Africa, nonethe- Hammond concluded that "spiral-four is
less, during the Tunisia Campaign, along completely unreliable." "Dump it in the
with MAL, which was possibly the better ocean," said another signal officer serving
of the two expedients.53 Theater needs dur- with the Army Air Forces; still another,
ing early 1943 were met chiefly by a com- "our troops had never seen this material
bination of rather conventional wire facili- prior to being put on it to construct the
ties, commercial French, British military,
lines and I guess that we made every mis-
take in the book and a few of our own as
and American military. The American wire
most used was field wire W-110, on poles well." 56
The whole trouble was that there were no
of varied sorts or on the ground.
instructions or instructors until General
In such circumstances, extensive use of
spiral-four cable might have been expected. 54
Remarks by Maj Bower Before Group Viewing
With carrier installations at the terminals, Training Films, OCSigO, 8 Jul 43. North Africa
Folder 1, SigC Hist Sec File.
one spiral-four field cable could do the 55
McCrary, Answers to Questionnaires Obtained
work of many wire lines. The new cable in Atlantic Base Section, Col Purkhiser, CO 239th
Sig Opns Co answering, p. 2 [p. 49] SCIA File 28,
was tested and ready, having been proven McCrary Rpts.
56
(I) Incl 4, Ltr, Tully to Brig Gen Richard B.
52
(1) Lt Col J. M. Fronk, Signal Operations in Moran, CSigO Fifth Army, 25 Aug 43, p. 3, with
the Communication Zone, Orientation Lecture, 15 Ltr, Tully to CSigO, 11 Sep 43. Tully quoted Ham-
May 44, pp. 9-11. North Africa Folder 1, SigC Hist mond's remark. SCIA File 23, Tully Rpts, 1. (2)
Sec File. (2) Jackson, Tactical Communication in Interv, McCrary with Lt Col Pruitt, Sig Officer
World War II, Pt. I, pp. 153-54. 12th Air Support Comd, 28 Feb 43, p. 1 [p. 139]
53
SigC (OR) 676 General, Wire, British Multi- SCIA File 28, McCrary Rpts. (3) Fronk, Orienta-
airline, passim. tion Lecture, 15 May 44, p. 11.
264-211 O - 78 - 25
370 THE SIGNAL CORPS
Matejka sent for them.57 Consequently early a 75-mile stretch of RPL from Mostaganem
in 1943 a team headed by Maj. M. M. to Oran and on lines from Souk Ahras to
Bower from the Ground Signal Equipment Souk el Arba. And they saw to it that spiral-
Branch went to North Africa to instruct four lines went to work with an efficiency
everyone who handled spiral-four, carrier which completely refuted the "dump-it-in-
equipment, and RPL material. The team the-ocean" reaction. A 20-mile length of
opened up schools in Oran and Algiers, set spiral-four simply laid, like field wire, on
up demonstration lengths of spiral-four and the ground alongside an airline (MAL) in-
RPL with carrier equipment at the termi- stallation, gave more continuous service,
nals. They demonstrated proper methods of Bower reported, than the MAL did during
suspending spiral-four cable above the three weeks of action around Kasserine
ground and of burying it quickly and effi- Pass. Especially important were four spiral-
ciently in trenches dug by the useful cable four carrier systems totaling over 300 miles
plow LC-61. They prepared instruction from Djidjelli along the coast to Mateur,
folders and distributed them. In short, they some of it buried with the aid of the cable
provided the instruction which Signal Corps plow, some of it strung on poles on mes-
officers and wire crews should have had at senger wire (the supporting wire under
home: instruction which normally they which a cable is slung). It was spiral-four
would have received had not the preceding carrier systems with all their advantages of
months been crammed with such innova- great speed of installation and of tremen-
tions as normally appear only over years. dous traffic capacity that provided the first
Training facilities and training time simply and only telephone circuits from AFHQ in
had not been able to keep up, let alone do the Constantine and Bone area directly into
58
justice to older equipment and methods. the Mateur-Bizerte area of Tunisia when
Major Bower and his helpers, D. L. Chaf- the campaign ended victoriously in mid-
fee and H. E. Weppler, both from the May for the Allies,59
Eatontown Signal Laboratory, provided the Victory by no means ended the need for
needed assistance toward getting the new such heavy-duty communication facilities
developments installed in North Africa. in North Africa. On the contrary, the need
Utilizing French commercial wire lines al- intensified. North Africa became the base
ready in place, they got the first four-chan- area for staging and supplying further in-
nel CF-2 military carrier telegraph system vasions into Sicily, Italy, and southern
into operation in North Africa, between France.60 Tactical communications in North
Oran and Algiers. They helped similarly on 59
(1) Ibid., pp. 4-5. (2) Ltr, Bower to CSigO,
2 Jun 43, sub: Application of spiral-four cable car-
57
The problem of introducing new signal equip- rier and RPL construction. North Africa Folder 1,
ment into a theater of war became very serious SigC Hist Sec File.
60
with spiral-four, with carrier, with facsimile, and General Matejka reported that after all op-
with radar. Colonel O'Connell subsequently recom- erations in North Africa had ceased, the signal traf-
mended that a technical service be set up in each fic handled at AFHQ increased "36.4 percent—
theater and that technical experts be sent with from about 260,000 groups to 365,000 groups a
each new type of equipment. Tab L, Incl with day." Memo, Matejka for Heads of Staff Secs, 19
Ltr, O'Connell to CSigO, 9 Aug 43, sub: Rpt of Jun 43, sub: Sig traffic, in Tab E Incl with Ltr,
observations in NATO. SCIA File 113, O'Connell O'Connell to CSigO, 9 Aug 43, sub: Rpt of ob-
and Glasgow Rpts. servations in NATO. SCIA File 113, O'Connell
58
Memo, Bower for CSigO, cited n. 51, pp. 1-4. and Glasgow Rpts.
THE TEST AT ISSUE IN NORTH AFRICA 371
Africa then gave way wholly to its bigger but could not find him. Not till nearly mid-
brother, administrative communications. night did the radio officer locate the general
Spiral-four field cable together with the near Souk Ahras. As soon as he returned
military carrier telephone and telegraph to his headquarters and to the SCR-299,
(CF-1 and 2) equipment filled the very communications were quickly established
need which General Lanahan described as with General Henri Honore Giraud in the
"a virtual AT&T system." Eventually it was French sector of the front and then with
accomplished with the assistance of a very Lt. Gen. Mark W. Clark in the Allied Forces
new development indeed, which tied to- Headquarters, Algiers. General Eisenhower
gether radio and wire facilities into one sin- dictated to the radio officer his message
gle integrated communication system by choosing Giraud as Darlan's successor, and
which a message could travel from a radio the receipt came back from Algiers only six
transmitter over the air, into a receiver and minutes later.62
onto wire, to a switchboard, and so to an It was incidents such as this, it seems,
individual's telephone set, or vice versa. which made the general decide that he must
This development, child of the North Afri- have a long-range radiotelephone small
can campaign, was radio relay. The idea enough to fit into the trunk of his car, and
that it might become a valuable military he sent a staff officer back to Washington
facility already had been circulating among to emphasize his demand. The demand fell
some Signal Corps officers and laboratory upon General Colton, head of the Signal
engineers.61 Early in 1943 the Signal Corps Supply Service, in his capacity as develop-
was able to put the idea to the test, thanks ment chief. A radiotelephone, trunk size,
to General Eisenhower. able to reach from the Tunisian front hun-
In the closing days of 1942 General Eisen- dreds of miles back to headquarters in Al-
hower demanded a radiotelephone with giers, was obviously impossible. Yet some-
which he could call up his headquarters, thing very like it was possible. In recent
however distant. Ordinarily, an SCR-299 months Signal Corps laboratory workers
radio truck and trailer accompanied Eisen- had cogitated upon radio equipment able
hower's car. Whenever he stopped, the men to link breaks in wire lines, as across water
ran a short line linking a telephone in the barriers. This had been accomplished in
car directly to the radio in the truck. On recent years by commercial companies in
24 December, however, the day on which a number of applications using AM radio.
Eisenhower decided to call off the abortive New FM techniques so improved radio-link
effort against Tunisia, an urgent message operation that by late 1942 the Signal
came in from Algiers announcing the as- Corps was developing radio-link equipment
sassination of Admiral Jean Francois Dar- to meet the Air Forces needs for relatively
lan. Urgent though it was, the message could short lines of point-to-point communica-
not be delivered at once. The general was tion, replacing wire altogether.63
absent from his temporary headquarters 62
(1) Jackson, Tactical Communication in World
and was out somewhere on the road without War II, Pt. I, pp. 89-92. (2) Interv, SigC Hist Sec
with Lt Col Esterly C. Page (in 1942-43, radar
benefit of signal personnel (this at his own officer in Sig Sec, AFHQ), Sep 44.
request). A special dispatch rider searched, 63
(1) John J. Kelleher, "Radio Relay and the
War," Signals 1:5 (May-Jun 47), p. 37. (2) See
61
See above, pp. 234, 236. above, pp. 234ff.
372 THE SIGNAL CORPS
General Colton, pondering Eisenhower's heights averaging about 100 miles apart:
demand, called in Colonel O'Connell, one Djebel Toukra near Bougie, Djebel Ouasch
of his ablest officers in research and devel- near Constantine, and Djebel Rorra on the
opment, who suggested a series of radio re- border of Tunisia. The last station was in-
lay stations strung forty miles apart from stalled in time to be of service to the II
Algiers to the front. With an ordinary ra- Corps while it operated in the vicinity, so
diotelephone installed in his car, Eisen- that a mobile terminal accompanying the
hower could talk to the nearest relay pickup corps headquarters could flash messages to
station. Though the mobile radiotelephone the Rorra station, whence it could transmit
would have to be reasonably close by, within through the other hilltop stations back to
twenty or forty miles, the nearest pickup Algiers, and vice versa.
could instantly flash the voice back through The actuality differed somewhat from the
as many relays as might be needed to cover demand. Eisenhower had wanted a com-
the distance to headquarters. That very au- mand radiotelephone, emphatically for
tumn the laboratories had experimented voice alone. Accordingly, the Signal Corps
with radio relay, trying to find military tak- teams arrived with voice radio only. But the
ers, at maneuvers in North Carolina. This officers responsible for signal security ob-
equipment, so far unsolicited, Colton at jected. "We didn't get very far in putting
once dispatched to Eisenhower, together any voice on the air," said Russell A. Berg,
with a crew of Signal Corps laboratory one of the civilian radio members of the
experts.64 Eisenhower's specific demand laboratory team. "They wouldn't tolerate
would promote an idea, which some Signal General Eisenhower going on the air and
Corps men had been trying to sell, into an putting his latest thoughts on the air as to
actuality of tremendous import. what they should do with the armies for
In January 1943 a team of six radio en- the next two weeks." Instead, all traffic had
gineers from the Coles Signal Laboratory to be enciphered and sent on teletype. The
went to North Africa carrying radio equip- team did some quick calculations and pro-
ment that was principally Motorola police cured British two-tone telegraph and tele-
typewriter equipment. This union of Amer-
radio, FM type. The radios would operate
ican FM radio and British teletype bore
only on very high frequencies and therefore
good fruit. Radio relay became a radiotele-
the sending and receiving relay stations had type for moving headquarters, only slightly
to be located in a line-of-sight, without ob- short of a radiotelephone for the general's
stacles intercepting the beams of signals. In personal use. Mobile equipment at the front
so rugged a land as North Africa, that was loaded into a weapons carrier and was
meant locating the relay stations atop high able to communicate back to the relaying
elevations. Aided by Company D of the station from any point up to fifty miles
829th Signal Service Battalion, the men set distant.65
up the first three stations on 4,000-foot 65
(1) Draft of Min of Conf Held at Camp Coles
Sig Lab, 12 Aug 43, sub: Visit of Berg to NATO,
64
Interv, SigC Hist Sec with Maj Gen Roger B. pp. 3-4, 16. North Africa Folder 2, SigC Hist Sec
Colton, Ret., exec vice president of Federal Tele- File. (2) Incl, Rpt of Operations, FM Radio Relay
communications Lab, N. J., 14 Feb 50, p. 3. Some System for AFHQ NATO, by Capt O. D. Perkins
months earlier, O'Connell had gone on record in and others (Durrer, Colaguori, Neidt, and Kinna-
favor of radio links as a means of rapidly project- man), with Ltr, Perkins to Dir of Camp Coles Sig
ing combat communications. See above, p. 236n. Lab, 8 Sep 43. SCIA File 23, Tully Rpts, 1.
THE TEST AT ISSUE IN NORTH AFRICA 373
About 20 April the relay system began of combat experience, changes and inno-
to work, as a simplex single-channel radio- vations in the signals of the Army Air Forces
teletype. As the campaign progressed and also. The airmen had spread their own
the mobile equipment serving the II Corps radio nets over North Africa, paralleling
headquarters moved farther into Tunisia Army nets. Like the ground forces, too, they
away from the third relay station atop used the SCR-299's for long distances
Djebel Rorra, it became necessary to set up (rather than SCR-188's, the older long-
a fourth relay, which went up on the re- range set which the Signal Corps had orig-
nowned Hill 609, known simply by its inally designed to serve the Air Corps).
height in meters, as printed on Army maps. Ground-air communications were indiffer-
The Signal Corps crew put this fourth re- ent at first. Visual signals—such as lights,
lay station into operation nine days after pyrotechnics, or panels of colored cloth
the Germans had been driven from the stub- laid out on the ground—were considered
bornly held height. Upon the fall of Tunis unsatisfactory.67 Air support for ground
in May, the mobile headquarters station troops was not always obtained with ease.
radioed the news to Hill 609, whence it But the II Corps in the Tunisian fighting
flashed back in four giant mountain hops developed good co-ordination. During the
over the 400 miles to Algiers, some twelve fighting in central Tunisia, a direct wire
hours before the usual wire circuits became line linked the corps command post switch-
available and a message center was set up board with the 12th Air Support Com-
at Tunis. This first American Army radio mand, so that the II Corps could get air
relay system handled large quantities of II support within thirty to sixty minutes.68 One
Corps traffic and press reports, with inter- innovation in particular, which Colonel
ruptions due to equipment failures or at-
Tully described as highly satisfactory and
mospherics amounting to less than 5 per-
effective, was the air-support party. An air-
cent of the time, a percentage of outages
much smaller than that suffered by wire support party served with each division or
66
lines in the same area. Beginning with combat team. Equipped with an SCR-
these first relays linking Algiers and Tunis, 299 and an SCR-522, it could communi-
Army tactical communications enjoyed the cate both with the ground forces and with
large facilities hitherto available only to ad- any friendly aircraft within range.69
ministrative systems. From now on, mili- Fighter craft command radio now op-
tary communications would make increas- erated in the very high frequencies, using
ing use of radio relay, as the equipment the VHF command set SCR-522. These
took form in the AN/TRC types, commonly new radios worked fairly well, within the
called antrac. limitations of the sets (not enough chan-
Along with these new developments in nels and trouble with noise and interfer-
the communications of the ground troops
in North Africa, there arose, in consequence 67
Incl 1, Information Relative to Signal Com-
munications Based on Operations during the Tu-
66
(1) Berg, Draft of Min of Conf, 12 Aug 43, nisian Campaign, p. 1, with Ltr, Tully to CSigO,
passim. (2) Perkins, Rpt of Operations, passim, 1 May 43. SCIA File 23, Tully Rpts, 1.
68
cited n. 6 5 ( 2 ) . (3) Jackson, Tactical Communica- Jackson, Tactical Communication in World
tion in World War II, Pt. I, pp. 142-43. (4) Page War II, Pt. I, pp. 104-05.
69
Interv cited n. 6 2 ( 2 ) . Incl cited n. 67, pp. 1-2.
374 THE SIGNAL CORPS
ence). 70 Allied aircraft were also equipped Signal Corps Radars Meet the Test of War
with IFF, for identification in search radar
scopes. But that did not mean identification American radar met the North African
by troops unaccompanied by radar. Quite test well and the new American microwave
the opposite. Identification both up and sets presently proved to be as important a
down was an extremely sore point. United new development in combat signals as
States aircraft attacked American troops spiral-four cable and radio relay. Yet Amer-
all too often, and American troops fired on ican radar in North Africa got off to a
U. S. aircraft. One armored column in a bad start. At first radar officers were few
few short hours was shot up twice by and radar in combat was not yet appre-
American planes, as well as twice by Ger- ciated by the American troops. "Our com-
man craft, losing more men to the Ameri- manding officers," subsequently commented
can attacks.71 And the Signal Officer, one historian of the subject, "seemed not
Twelfth Air Force Support Command, re- yet aware of the military capabilities of
ported, "We have lost more planes from radar." 75 They tended to rely upon the
our own antiaircraft fire than we have from British, possibly because of the Air Forces'
enemy antiaircraft fire." 72 When the marked preference for English sets and their
strangely new, twin-fuselage P-38's first operators. Yet the Signal Corps sets and
appeared, they,were shot at by Allied forces their crews soon proved good enough to
until the Air Support Command radioed arouse the respect of the British, who had
to the ground forces that the P-38 did not originally intended to employ only their own
look like any enemy aircraft, and would radars in North Africa.
the troops please refrain from shooting at "Planning for proper radar coverage
them.73 The fact that the Germans had caused us some headaches," General
similar troubles hardly made amends. At Matejka told members of the Army and
radar stations, IFF was doing the job in- Navy Staff College on 19 August 1943. This
was because of the geographic split between
tended. Captain Bates, commanding an
the groups who planned and staged the
antiaircraft unit of the 68th Coast Artillery,
invasion. At the start of the TORCH plan,
told McCrary that his men, using the SCR- AFHQ in London had decided to use Brit-
268, had had no trouble with IFF. "All ish radar only. But the decision could not
friendly planes are equipped with IFF and stand. Since the Western Task Force was
it works quite well as far as we are con- staging in America, American radar would
cerned," Bates reported.74 have to accompany it. Radar operations in
70
North Africa, British and American, would
Ltr, Col Yeager to CG AAF, 12 Jun 43, sub: have to be co-ordinated. They were. The
Rpt of visit of Col Yeager, Air Corps, to NATO,
Ninth Air Force, and ETO, 6 Apr 43-7 Jun 43. combination worked "remarkably well"; so
SCIA File 75, Yeager Rpt.
71
well, indeed, according to Matejka, that
McCrary, Answers on Organization, No. 34, pp.
9-10 [p. 75] SCIA File 28, McCrary Rpts.
"the British in particular were pleasantly
72
Interv, McCrary with Pruitt, p. 2 [p. 140]. surprised at the results." 76 The Signal Corps
73
Interv, McCrary with Maj Thomas, p. 2 [p.
75
123] SCIA File 28, McCrary Rpts. Dr. Henry E. Guerlac, Hist Div OSRD, Radar,
74
Interv, McCrary with Capt Bates,. CO Battery 1945, p. 1003 (Sec E, Ch. I, p. 2 1 ) .
76
B, 68th CA, p. 2 [p. 126]. SCIA Fil^28, Mc- Incl, Signal Communication Talk by Brig Gen
Crary Rpts. Jerry V. Matejka cited n. 49 ( 1 ) .
THE TEST AT ISSUE IN NORTH AFRICA 375
was gratified, its faith in its sets and men unsatisfactory as ground search radars.79
sustained. Signal Corps ground radars for air de-
At the invasion, signal aircraft warning fense first came into large-scale combat use
battalions had trouble getting ashore and in North Africa. Here the Allies encoun-
into operation. In fact, they often did not tered an enemy who was relatively well pro-
have all their equipment. Weighing tons vided with aircraft and who was relatively
per set, the radars lay, inaccessible, in the stronger aloft than would be the case in
bottoms of the convoy ships, and many subsequent campaigns. German Stukas and
were lost in the sinkings off Casablanca in night bombers sorely harassed the invaders.
The Allies at once set about employing radar
mid-November.77 The 561st Aircraft Warn-
on a huge scale, commensurate with the
ing Battalion had departed from America
long lines they had to defend extending from
hastily organized and without having seen
Casablanca to Tunisia. They concentrated
its equipment, which was left behind at
their sets in the eastern area toward Tunis,
the Brooklyn Army base.78 When in some and the enemy's airfields there. American
rare cases both the radar men and their radars alone soon numbered in the hun-
equipment did get ashore, they sometimes dreds, principally the SCR-268's and the
found radar less highly rated than they had 270's. By September 1943 there were 283
hoped. For example, the 560th Signal Air-
sets of 268's and the related 516's in the
craft Warning Battalion landed at Port-
theater.80 The SCR-268 won considerable
Lyautey, only to have its men drafted as
appreciation from Coast Artillery units that
stevedores. No doubt the need to unload
used the radar to track aircraft and direct
the ships was more desperate than the need 81
searchlights.
for air defense. At least the base commander
To the Eastern and Center Task Force
in drafting the radar specialists made better
landings, the British brought their long-
use of the unit than did at first the com-
wave radars, COL's, MRU's, GCI's, and
manding officer of Craw Field, who, in the
LW's. A few LW's (SCR-602) and GCI's
words of the commander of the 560th Sig-
(SCR-588B) came from America too. It
nal Aircraft Warning Battalion, "did not
was the LW type which was needed for the
and would not understand our mission." All
this so delayed the battalion's specialized 79
Interv, SigC Hist Sec with Maj G. W. Johns
business that not until 16 November, D plus (formerly CO, 560th Sig AW Bn, NATO), 5 Dec
42. This battalion, lacking suitable radios, used
8, did the men set up their first radar, an VHF SCR-522 airborne command sets, which had
American LW, the SCR-602, on a hill been supplied for ground communication with air-
overlooking the airport. Not having enough craft. But their range from the ground proved too
limited, forty miles or less. In common with all units
SCR-602's, the battalion put to use a num- at the invasion, the 560th Signal Aircraft Warning
ber of airborne ASV radars, SCR-521's, Battalion suffered severely for want of transport,
having only four jeeps and four 54-ton trailers.
which, as might have been expected, proved 80
1st Ind, CSigO to CG APO 512, 6 Sep 43, on
Ltr, Tully to CSigO, 12 Aug 43, sub: Power units
77
Incl with Ltr, Yeager to CG AAF, 12 Jun 43, PE-84. SCIA File 23, Tully Rpts, 1.
81
cited n. 70, Agenda A, p. 1. Intervs, McCrary with Capt Stephens, CO
78
Memo, Matejka for CofS, 31 Jan 43, sub: Sig Battery B, 213th CA, 25 Feb 43, p. 1, and with Capt
lessons of Opn TORCH, pp. 5-6. SCIA File 13, Bates, p. 1 [pp. 31 and 125] SCIA File 28, McCrary
Matejka Rpts. Rpts.
376 THE SIGNAL CORPS
serving also as information centers cover- to it invariably. Three lofts of the North
ing last-minute developments in the very African Pigeon Platoon, part of the 829th
teeth of German drives at Sbeitla, Feriana, Signal Service Battalion, were located early
102
Gafsa, and the Kasserine Pass. in 1943 at Constantine, Tebessa, and
During the battles at the Kasserine Pass, Sbeitla. Pigeons homing on a loft at Beja in
Combat Command B was linked by radio northern Tunisia were employed for a pe-
with the 1st Armored Division headquar- riod of seventeen days during campaigns
ters at Haidra by means of SCR-299 teams in the vicinity. During this time birds that
from the 53rd, working from the Command had been parceled out to front-line units
back to the II Corps. Another 299 con- brought back seventy-two important mes-
nected with the Twelfth Air Force. The 53d sages and many less urgent ones. In some
also maintained wire, radio, and messenger cases they got the message through first,
service from the II Corps headquarters to as upon the retaking of Gafsa in March
numerous points over the battle area. during the southern Tunisia Campaign.
Throughout the Kasserine crisis, the II The first complete report of the recapture
Corps commander, Lt. Gen. Lloyd R. Fre- reached corps headquarters carried by the
dendall was able at all times to talk over the pigeon "Yank" returning to the home loft
telephone to all of his key commanders and near Tebessa, having made the 90-mile
installations as far down as the combat flight from Gafsa in 110 minutes. It was the
teams and as far up as the British First first report to arrive because wire had not
Army and the Allied Forces Headquarters yet caught up with the advancing troops
Advance Echelon in Constantine.103 and because a radio net had not vet been
In fast-moving situations, all manner of established. Pigeons could be valuable dur-
communications were used in all sorts of ing the periods of radio silence, especially
combinations: wire (telephone, telegraph, if at the same time wire lines happened
teletype), radio, visual means,104 messen- to be incomplete or out of action.105
gers, pigeons. They were often used in paral- In the campaign, Signal Corps units per-
lel, so that if one facility was knocked out, formed all manner of functions. The 141st
another would be standing by. Pigeons, for Armored Signal Battalion, serving Armored
example, received considerable use in this Combat Commands A and B during the
theater of war. Before the birds can be used last ten days of January 1943, provided wire
in any situation, their home loft must re- circuits to all division units, the usual job, of
main in one place at least a week before course, for division signal companies. At the
they will settle there, having become so same time the 1st Signal Company served
familiar with the location that they return
the 16th and 26th Combat Teams. All in
turn were linked to the II Corps command
102
Jackson, Tactical Communication in World
post some miles east of Tebessa through
War II, Pt. I, pp. 97-99. small improvised signal centers maintained
103
Ibid., p. 100. by the 53d Signal Battalion at Maktar,
104
Lt. L. N. Reiser, assistant communications offi-
cer, Division Artillery, 34th Division, reported on
Sbeitla, Feriana, and Gafsa, and all were
26 February, "We have used signal lamps to a tied together by parallel lines—an open-
limited extent. . . . We have also used semaphores, wire facility and a field wire line.
but only when we don't have other means of com- 105
munication." Interv, McCrary with Reiser, 26 Feb Jackson, Tactical Communication in World
43, p. 4 [p. 44] SCIA File 28, McCrary Rpts. War II, Pt. I, pp. 100, 133, 143, 164.
MEN OF THE 53D SIGNAL BATTALION repaired wire lines (above) and operated
Signal communications trucks for II Corps in North Africa (below).
384 THE SIGNAL CORPS
The 53d had built the open-wire line, it was late in the evening. The corps wire
some 220 miles, making use of existing officer was busy shifting the wire circuits
French poles. They had also laid, by the first by making call after call to key points in
of February, some 360 miles of field wire in order to assure telephone and telegraph
co-operation with the Air Support Com- service at the other end of the battle front.
mand Signal Battalion. Attached to the 53d These services had to be arranged and ready
was a detachment from Company B of the within three hours. The corps radio officer
829th Signal Service Battalion with two was likewise busy at the phone arranging
SCR-299 crews and trucks serving the II for emergency radio communications in
Corps headquarters. Thus, providing com- areas where wire facilities had not yet been
munications for the II Corps was a large completely installed. "Corps radio, wire,
assignment, especially because of the un- teletypewriter and message center teams are
precedented front over 140 miles wide and moving at this moment," Tully wrote, "to
90 deep.106 Maneuver problems at home had the other end of the line, to an advance
never contemplated such distances, nor such Corps signal center being established there
conglomerations of patch-up facilities. For from which we will give more detailed in-
example, one teletypewriter circuit from the structions to teams later tonight as the tacti-
II Corps to a division command post ran cal plan unfolds." The message-center op-
for 113 miles over no less than five different erators were revising their messenger runs.
wire segments, French, British, and Ameri- The few open-wire commercial circuits in
can, open wire and cable.107 Yet it all worked the area were being reassigned. "By mid-
surprisingly well. Communications here in night," Tully wrote on, "we hope to have
combat were better, said Maj. Gen. Or- both ends of the line well in hand." Suc-
lando Ward, commanding the 1st Armored cess in tactical field communications, Tully
Division, than he had ever seen them in believed, was apt to be a "by guess and by
maneuvers.108 gosh" proposition, amid the general lack of
A glimpse of the busy life of Signal Corps advanced information. "Success is due
officers in the field flashes from an on-the- mostly to a thorough anticipation or a damn
spot account by Colonel Tully, II Corps good guess as to what somebody else will
signal officer. "We are in the midst of a decide later," he concluded. "I am con-
very mobile, very fast moving operation vinced by this time that successful com-
with a very fluid front," he wrote early in munications depend upon getting the actual
1943. He compared the Corps command means of communication under way even
post to a quarterback, well behind the line before the staff has completed its plans. If
of scrimmage, directing the play on one the Signal Officer waits for the staff's de-
end of the line and then suddenly shifting cision before planning his communications
the play to the opposite end some dozens in an operation of this kind over such dis-
of miles away. As Tully dictated his account,
tances, it might be too late." 109
106
(1) Ibid., pp. 95-96. (2) History of the 53d
During the mid-February lull in fighting,
Signal Battalion, p. 8.
107 109
Incl 1, Information Relative to Signal Com- Signal Corps Technical Information Letter,
munication Based on Operations during the Tu- No. 17 (April, 1943), pp. 6-7, edited from Ltr,
nisian Campaign, p. 3. Tully to Gen Van Deusen, 1 Feb 43. SCIA File 23,
108
Interv, McCrary with Tully, p. 3 [p. 112]. Tully Rpts, 1.
THE TEST AT ISSUE IN NORTH AFRICA 385
Colonel McCrary, sent to survey the North progress but re-establishing them as soon
African theater signal scene, found that the as possible afterwards.111
recent weeks of conflict baptizing Ameri- Radio proved itself, especially the big
can troops and equipment in battle had em- SCR-299. Everyone liked it. One British
phasized the need for extreme flexibility. staff officer stated that "using a 299 after
Communication facilities must allow simul- using any British R/T set is like driving a
taneously the seeming incompatibles of private car after handling a three-ton
rapid mobility over great distances and of lorry." Maj. Gen. Charles W. Ryder told
close co-ordination among ground and McCrary that the SCR-193 was "fine" and
ground-air teams. Field manuals had set the 299 "mighty fine." 112 An odd SCR that
the frontage of a battalion in full strength became very popular in the North African
in a main attack at 500 to 1,000 yards. But theater was SCR-625, not a radio at all
here the yards stretched into miles. Divi- but a mine detector employing electronic
sions operated on fronts which ran to the circuits. It was used by everyone, not least
tens of miles. The 34th Division front in by the Signal Corps men working on wire
northern Tunisia in February extended for lines along roadsides which the Germans
24 kilometers at the main line of resistance almost invariably mined.113
and for 40 kilometers at the outpost line. The Signal Corps men and signalmen
In the 1st Armored Division the gap be- proved themselves. Despite the handicaps
tween headquarters and the division's rear which resulted from inadequate training
echelon varied from zero to 100 miles. "The and lack of familiarity with new equipment,
situation here has not been like any we were they nonetheless learned how to make com-
taught at school," said Captain Green, munication systems work, whatever the fa-
communication officer of the 18th cilities and despite severe difficulties in sup-
Infantry.110 ply and repair. They began to win high re-
Wire proved that it still had a vital place gard. "A commander and his staff are
in modern mobile war. It was always used never niggardly about signal personnel after
during contact with the enemy and move- the first campaign."114 High casualties
ment under radio silence when, during sometimes added to the problem of getting
halts, a line would be rushed from the di- enough such men and of getting trained re-
vision to the regiment. When not on the placements. Colonel Williams, speaking of
move, a division headquarters generally had an extreme case of battle disaster, said to
one telephone and one telegraph channel McCrary after the Kasserine engagement,
by which to reach its regiments. If the situ- "We are going to have to do something
ation were sufficiently stable, two tele-
111
graph channels would be set up along dif- Jackson, Tactical Communication in World
War II, Pt. I, pp. 105-06.
ferent routes. The 1st Armored Division 112
(1) Ibid., p. 115. (2) Interv, McCrary with
put in circuits during nighttime, breaking Ryder. 113
Jackson, Tactical Communication in World
them of course while an attack was in War II, Pt. I, p. 147.
114
Incl, Signal Communication Talk by Brig Gen
110
(1) Jackson, Tactical Communication in Jerry V. Matejka to Members of the Army and Navy
World War II, Pt. I, p. 103. (2) Interv, McCrary Staff College, 19 Aug 1943, with Ltr, Capt Walter
with Maj Gen Charles W. Ryder, 26 Feb 43, p. 1, to Col Mason, 7 Oct 43. SCIA File 13, Matejka
and with Green, p. 2 [pp. 5 and 26, respectively]. Rpts.
264-211 O - 78 - 26
386 THE SIGNAL CORPS
about our losses of communications per- Corps had a photographic detachment of
sonnel. In one battle, the 1st Armored Regi- three officers and fifteen men. Concomi-
ment lost every single communication of- tantly with the campaigns ran training pro-
ficer and warrant officer except one, and all grams and in this work training film be-
company communications officers and tech- came extremely valuable. Weary men could
nical sergeants." 115 hardly be expected to derive much benefit
New types of Signal Corps units proved from classroom teaching, but they could
themselves, too. Radio intelligence units, relax before a movie screen and learn with-
for example, had got off to a bad start at out exertion. By April a training film li-
the invasion, having been employed as as- brary was located in the Atlantic Base Sec-
sault troops. The 128th Radio Intelligence tion, Casablanca, and doing a land-office
Company was one of the first of its type business supplying films. General Matejka
to meet the test of war. During the Tunisia wanted four more such units. At the same
Campaign the men got busy with their in- time, he was urgently seeking more Signal
tercept receivers and direction finders (all Corps photographers; in particular, he
they had were the older, rather poor SCR- wanted the entire 163d Signal Photo Com-
206's and 255's) and tracked the Germans pany.117
"all over the place." They were the first Quite aside from the strategic implica-
to discover through their special skills that tions, the North African campaign was im-
the Germans were withdrawing from Kas- portant as the first major testing ground for
serine and thereafter on several occasions American forces in World War II. To the
gave advance warning of enemy attacks. Signal Corps it was particularly significant
In this work and in the work of monitoring because it provided a turning point in the
the radio procedure of American units and military view of the importance of com-
correcting abuses, they proved their munications in the modern army. By the
worth.116 time the campaign ended in May 1943, the
Combat photography came into its own, key part which communications had played
covering battle actions for the record, for in co-ordinating all the complex elements of
study, and for publicity, and turning out the Allied Forces deployed on a wide front
such valuable training films, made and had been demonstrated. It had been demon-
much used on the spot, as Removing Mines strated again and again, with forcefulness
and Booby Traps. From March on the II that drove home to everyone. Army officers
who had not been signal-minded before
115
(1) Jackson, Tactical Communication in became so now. The Signal Corps itself,
World War II, Pt. I, pp. 122-23. (2) Interv,
McCrary with Williams p. 2 [p. 7]. after an unsure start, had gained further
116
(1) Jackson, Tactical Communication in competence and confidence. These quali-
World War II, Pt. I, pp. 83, 114, 161. (2) Intervs, ties, in the larger campaigns which lay
McCrary with Capt H. F. Bearce, pp. 1-2, and
with Tully, p. 3 [pp. 39-40, and 112, respectively]
ahead, would pay large dividends.
SCIA File 28, McCrary Rpts. (3) Ltr, Capt Shan-
117
non D. Brown, CO 128th RI Co to Sig Officer Hq (1) Jackson, Tactical Communication in
II Corps, 12 May 43, sub: Opns. SCIA File 23, World War II, Pt. I, pp. 117, 145, 165. (2) Incl,
Tully Rpts. 1. Other Radio Intelligence units pro- Matejka, Answers to Questions, with Ltr, Matejka
viding signal intelligence services in the North to CSigO, 18 Apr 43, sub: Questions desired an-
African campaign were the 117th, 122d, 123d, and swered by OCSigO, pp. 33, 35. SCIA File 13,
849th Companies. Hist Sig Sec, AFHQ, pp. 38-40. Matejka Rpts.
CHAPTER XIII
The Signal Corps own production facili- Chief Signal Officer urged that the studio
ties expanded rapidly in the first year of be bought without delay. By this time Para-
war, but for some months the Army's mount was less eager to sell, fearing to con-
photographic needs grew even faster. By centrate all its production on the west coast
midyear 1942 the widening scope of respon- lest the Japanese attack that area. After
sibilities had raised the Photographic some hesitation the firm consented and the
Division of the Office of the Chief Signal property was acquired.
Officer to the organizational level of a "serv- In February 1942 the War Department
ice," designated the Army Pictorial Service authorized the Chief Signal Officer to ac-
(APS) on 17 June.7 tivate the plant as the Signal Corps Photo-
Pearl Harbor brought to an abrupt close graphic Center (SCPC), an exempted ac-
the debate over whether or not the Signal tivity under his control.9 After alterations
Corps should purchase the Paramount had been made to provide accommodations
Studio at Astoria, Long Island, which was for troops, the Photographic Ceriter opened
on the market. For months, Col. Melvin E. in May, with Colonel Gillette in command.
Gillette, commander of the Signal Corps The modest Fort Monmouth Training Film
Training Film Production Laboratory Production Laboratory moved over to Long
(SCTFPL) at Fort Monmouth, had ar- Island. The replacement training center's
gued for the purchase. It would provide an courses in still photography were transferred
up-to-date plant where all training film pro- also and consolidated with the motion pic-
duction, processing, and distribution could
ture courses of the laboratory to form the
be consolidated, leaving the Signal Corps
Photographic Laboratory (SCPL) at Training Division of the new Signal Corps
Washington free to concentrate on still pic- Photographic Center.10 After six months of
ture production.8 On 12 December 1941 the war the Signal Corps had an up-to-date
7 plant for producing films and for training
Memo, Col Fred G. Miller, Chief of Adm Div
OCSigO, for Exec Officer, sub: Weekly prog rpt, photographic technicians.
19 Jun 42, p. 3. Weekly Achievement Rpts 15 Jun- Once established, SCPC rapidly outgrew
16 Jul 42. SigC Central Files.
The Army Pictorial Service became the Army Pic- its quarters, a performance it was to repeat
torial Division for a short time during 1942, then several times before the war ended. A re-
was redesignated the Army Pictorial Service, a name quirement to rescore the Army's films in
which it carried throughout the greater part of the
war and which will be used throughout the remain- other languages made it necessary to seek
der of this chapter. Under Col. Richard T. Schlos- more space, and resulted in the first expan-
berg until mid-June 1942, when Col. J. T. Watson
took temporary charge, the activity was commanded sion, the purchase of a building across the
by Col. Kirke B. Lawton from July 1942 to July
9
1944. For a more detailed account of the Army Ltr, TAG to CG, Ft. Monmouth and CSigO,
Pictorial Service organization and activities, see 18 Feb 42, sub: Designation and establishment of
James V. Clarke, Signal Corps Army Pictorial Serv- SCPC. AG 601.1 (2-4-42) MR-M-C.
10
ice in World War II, 1 Sep 39-16 Aug 45 (1945), Colonel Gillette remained as commanding offi-
SigC historical monograph F-2a. SigC Hist Sec File cer of SCPC until the early summer of 1943, when
8
(1) Memo, Gillette for O/C Photo Div OCSigO, he was assigned to Europe and replaced at the
2 Oct 41, sub: Consolidation of motion picture pro- Photographic Center by Lt. Col. Roland C. Barrett.
duction; (2) Memo, Gillette for Col Sadtler, Opns Returning to the United States at the close of 1944,
Br, OCSigO, 21 Nov 41, sub: SigC Hollywood he was at Astoria briefly before secret orders took
office. SigC EO 062.2 Tng Films—Analysis of Rpt him to the Pacific until the close of the war with
of TIG—Tng Film Production. (3) Terrett, The Japan. For the remainder of his life—only two
Emergency, pp. 228-30. years—he was on duty in Hawaii.
PHOTO BY U.S. ARMY SIGNAL CORPS 391
war came. Once overseas troop movements Field was rapidly growing into an organi-
began, SCPL was snowed under with iden- zation which in size, number of personnel,
tification and passport pictures; in the early and facilities was comparable to a com-
months of 1942 it was handling a daily load mercial studio.15 The Army Air Forces, how-
of 300 to 400 prints. No longer able to keep ever, remained unsatisfied. What it really
pace with the flood of news pictures, SCPL wanted was complete control of its own mo-
had some of them processed in a one-room tion picture activities, as General Arnold
laboratory, set up temporarily in the Muni- made clear in June when he originated a
tions Building and operated by the Bureau recommendation to that effect. In a staff
of Public Relations. In June 1942 the major study on the subject, the AAF argued that
portion of the Army Pictorial Service, which giving it authority to make its own training
had been quartered first in the Munitions films would avoid duplication of effort, de-
Building and then in a temporary building, lays, and confusions, and would result in
moved into the partly completed Pentagon. better service.16 Without waiting for ap-
By December the still picture section and proval the AAF organized the First Motion
the still picture files joined the parent or- Picture Unit, which promptly set up for
ganization. In the first months of 1943 a business in Hollywood.17
still photographic sublaboratory was opened The Chief Signal Officer, commenting to
in the Pentagon. There the most urgent General Somervell on the AAF staff study,
photographic work could be done, but the reiterated the Signal Corps' desire to per-
bulk of the still picture work was still han- form all the photographic services required
dled by SCPL at the Army War College. of it by law or regulation, for the AAF as
well as for other segments of the Army.
The Army Pictorial Service also acquired
He emphasized that no inherent difficulties
in the Pentagon an auditorium seating 300
existed that could not be solved by co-op-
and four small projection rooms for official
eration on both sides, but he indicated that
showings.13 in his opinion the AAF had not always pro-
While the Washington and Astoria plants vided such co-operation. The AAF, he
took on new life and flourished,14 the Train- said, had dealt directly with motion picture
ing Film Production Laboratory at Wright producers without going through channels,
13
(1) Intervs with Col William W. Jervey, Chief
and had thus "jeopardized War Depart-
of APS Div and Roland Barrett, Chief of Still Pic- ment relations within the motion picture
ture Br, APS, 5 Feb 48. SigC Hist Sec File. (2) industry." He cited as an example a train-
Memo, Maj Lloyd Leman, OCSigO, for Col Rich-
ard T. Schlosberg, O/C Photo Div, 20 Feb 42. SigC ing film on the subject of meteorology, to be
319.1 Rpts to Schlosberg and Lawton from Leman, made for the AAF by the Walt Disney
1941-43.
14
By July 1942 SCPC had ten training film units
Studios, which would cost five times the
in the field, four teams making film bulletins, one
15
filming scenes for Special Services Branch, and one Intervs, SigC Hist Sec with Col A. E. Holland,
making propaganda pictures for the Bureau of Pub- 15 Mar 48 and 24 Sep 53.
16
lic Relations. Selective Service was providing num- Incl 1, Tab A, Staff Study of Commanding Gen-
bers of first-class professional photographers, direc- eral, Army Air Forces, with Memo, Olmstead for
tors, script writers, and laboratory technicians, and CG SOS, 11 Jun 42, sub: Staff study of CG AAF,
as a result training films produced by SCPC were referring to photo activities. SigC 062.2 Photo Ac-
rapidly becoming more professional and effective. tivities 1942-43. OD-27.
17
CSigO, Annual Report, 1942, p. 333. APS Summary Rpt, p. 444.
PHOTO BY U.S. ARMY SIGNAL CORPS 393
amount the Signal Corps paid for training with motion picture production agencies
reels produced by commercial studios. AAF through the Chief Signal Officer.19
photographic problems were not unique, he The harmony created by this agreement
said, and what the AAF proposed would did not last out the summer.20 Bickering and
actually duplicate efforts, waste scarce ma- friction between the two services continued
terials, and cost more. The Chief Signal during the late summer and autumn. It is
Officer countered Arnold's suggestion with difficult to escape the conclusion that the
one of his own—to eliminate Army-wide AAF did engage in an organized campaign
confusion generated by divided responsibil-
to wrest control of AAF training films from
ity for photography by creating a War De-
the Signal Corps. Certainly the Signal
partment Photographic Service under the
Corps officers who served at the Wright
control of the Chief Signal Officer.18 Field laboratory and in the Washington
To consider the issues raised by Arnold's
headquarters at the time were convinced of
proposal and Olmstead's counterproposal, it, and have put themselves on record to
Signal Corps and Army Air Forces repre- that effect.21 At the end of the year, on the
sentatives met in General Somervell's office recommendation of Col. Kirke B. Lawton,
on 16 June 1942 and brought forth an the Chief Signal Officer withdrew signal per-
agreement that delineated the areas of re- sonnel from the Wright Field Training Film
sponsibility between the two services. It was Production Laboratory and left it wholly to
agreed that special Signal Corps photo- the AAF. The Signal Corps retained only
graphic units would be organized as an in- "such general technical control as for other
tegral part of the AAF, and under its com- technical services assigned to the Army Air
mand, to serve each unit of air force size Forces." 22 The Signal Corps personnel scat-
or larger. A photographic laboratory, or tered; many of them went to Astoria and
laboratories, to operate under the AAF, but
to be manned by the Signal Corps, would 19
Memo, Somervell for CSigO, 19 Jun 42, sub:
produce training films for the AAF. In brief, Photo activities (concurrence by CG AAF). Hq
ASF File, SigC, SPCG.
at the Wright Field Training Film Produc- 20
That it lasted at least two weeks is indicated by
tion Laboratory, the AAF would give the a memorandum to General Somervell from his chief
of staff, dated 3 August 1942, informing him that
orders; the Signal Corps would continue to "General Code reports that up until two o'clock
provide the money and the men to carry out Saturday there is complete harmony between the
the orders. For its part, the AAF agreed to Army Air Forces and the Signal Corps on all fronts,
including photographic. . . ." Memo, Gen Styer
assist the Signal Corps by providing tech- for Somervell, 3 Aug 42. Hq ASF CofS File.
21
nical assistance and equipment for air se- (1) Intervs with Lawton, 5, 8, 9 Mar 48. (2)
Intervs with Holland, 15 Mar 48; 24 Sep 43. (3)
quences in films which the Signal Corps Interv with Barrett, 5 Feb 48. (4) APS Summary
might have to provide for other branches of Rpt, pp. 440-45.
22
WD AGO Memo W105-5-42, 30 Oct 42. The
the Army, and to conduct all transactions Signal Corps' obligation extended to furnishing
funds for AAF motion picture work, although the
18
Memo, Olmstead for CG SOS, 11 Jun 42, sub: Chief Signal Officer had no knowledge of the de-
Staff study of CG AAF referring to photo activities, tails concerning the commitments or obligation of
and Incl 2, Tab B, Specific Analysis of Proposal of the funds secured for the AAF, and had no control
CG AAF. SigC 062.2 Photo Activities 1942-43. over their expenditure. Clarke, Signal Corps Army
OD-27. Pictorial Service, pp. 28-30.
394 THE SIGNAL CORPS
those who wished to remain at Wright Field needed. Qualified instructors were scarce,
were transferred to the AAF. since even experts from the commercial field
had to learn to adapt their skills to military
Training Cameramen use before they could teach others. There
was a vast difference between commercial
From the date of the first Selective Serv- publicity pictures and tactical, logistical,
ice induction until Pearl Harbor, the prin- and technical pictures for a heterogeneous
cipal method of procuring Army photog- audience—heterogeneous in the sense that
raphers was to screen the ranks of the newly the elements comprising the military ma-
inducted men for those who had been pro- chine all had specialized and dissimilar in-
fessional photographers in civilian life and terests. Some of the techniques to be mas-
to bring them into the Signal Corps. This tered were as simple as learning to load a
procedure was adequate for the time being, camera in the dark. Others were so difficult
particularly since school facilities were too and complex that only the battlefield could
meager to absorb any large number of cam- provide the final testing ground of profi-
eramen. By early 1942 any hope that Selec- ciency. Meanwhile, men who had little
tive Service might bring in enough trained enough skill with a camera at a field parade
photographers to fill the wartime needs for were hurried overseas to attempt combat
combat cameramen had been dispelled.23 photography because the calls for camera-
Selective Service yielded few photograph- men, as for other technicians, increased in
ers, and of those few, not all came to the direct ratio to the accelerated activation of
Signal Corps. Partly this was the result of troop units. The assignment system in effect
the classification system used at the recep- in 1942 operated to the disadvantage of the
tion centers, but it was also true that the combat units of the Army Ground Forces
average age of competent professionals was and the Army Air Forces. The commanding
so high as to eliminate most of them from general of the Army Service Forces pre-
the draft. Motion picture photographers sented requisitions for replacement person-
and scenario writers were especially scarce.24 nel for units under his control directly to
Lacking enough ready-trained men, the the Office of the Chief Signal Officer. All
Signal Corps had to enlarge its facilities for other requisitions went through the AGF
training the unskilled. Until the Signal or the AAF directly to The Adjutant Gen-
Corps Photographic Center was organized, eral. When photographic technicians grad-
the training facilities had been scanty in- uated from the SCPC and were reported to
deed. By the end of June 1942 SCPC and the Adjutant General's Office as available
its predecessor training activities at Fort for assignment, the Office of the Chief Sig-
Monmouth had trained and made available
nal Officer requisitions were chargeable
for assignment within the year 361 still and
25 against the men available. Thus the ASF
motion picture men. Many more were
requisitions were filled first; any photog-
23
Maj Arthur L. Gaskill, Training the Army raphers left over were assigned by the Ad-
Cameramen, Business Screen, VII: 1 (December,
1945). jutant General's Office against AGF and
24
OCSigO R&W Action 1, Schlosberg to CSigO, AAF requisitions. Since at that period there
27 Jan 42. SigC 352 Ft. Monmouth 1, Jan-May were never enough graduates to fill all needs,
42.
25
CSigO, Annual Report, 1942, p. 323. the Adjutant General's Office filled out the
PHOTO BY U.S. ARMY SIGNAL CORPS 395
AGF and AAF requisitions with replace- ceived brief but remarkably effective in-
ment center selectees. This procedure did struction in news coverage. The New York
nothing to assure that the best qualified press photographers co-operated with the
photographers reached the combat organ- administration at Astoria to solve the prob-
izations, a fact the Signal Corps pointed out lem of injecting photographic news sense
repeatedly in its unsuccessful attempts to into the novice. The professional photog-
have the combat photographic units put on raphers of Acme Pictures, the Associated
26
a priority basis. Press, International News Service, the Daily
It was the goal of Col. Richard T. Schlos- Mirror, PM, the New York Times, and the
berg, chief of Army Pictorial Service at the New York World-Telegram volunteered
time the SCPC was organized, to achieve a their services for this purpose. Students in
pool of 100 photographers to provide thor- the final stages of their training at Astoria
oughly trained men for emergency assign- and officers about to command photo-
ment to task forces. Instead the best some graphic units all had the experience of work-
of them got were men who had crammed a ing side by side with the professional press
60-hour course into a single week. In some photographers on actual press assignments.
areas Army units could get no soldier pho- Each professional took one officer or enlisted
tographers at all. A photographic center es- student along with him on assignments. The
tablished at Cairo to serve the United States novice took pictures of his own and later
Army Forces in the Middle East had to be compared his results with those of the pro-
manned by civilians and supervised by an fessional, learning what was faulty in his
officer and two enlisted men of a radio team own approach and what factors determined
on detached service from Karachi.27 Fre- quality and made for general news interest.
quently it was necessary to place Signal Above all, the student came out of this pe-
Corps officers with no photographic back- riod of supervised practice with a better
ground at all in command of photographic sense of composition and emphasis and with
teams. The results were about as bad as a better capacity for making split-second
might have been expected. decisions. After graduates of this course
But after July 1942, when the officer sit- reached theaters of operation, improvement
uation in general became better, all officers in the quality of pictures was noticeable.
assigned to photographic duties were given Even so, these men were not polished pro-
intensive training. First, they were sent to fessionals, and still lacked experience in
Washington to observe the methods of the combat photography.28
Army Pictorial Service and the Bureau of Motion picture training at Astoria began
Public Relations. Then, at the Signal Corps with an 8-week course which later was
Photographic Center at Astoria, they re- lengthened to 12 weeks and finally to 17
weeks. The training was intensely practical.
26
(1) APS Summary Rpt, p. 287. (2) Capt Fred- It included a short period of instruction in
erick Reinstein, Study of Signal Corps Enlisted
Schooling, 1939-1944 (1945), SigC historical the mechanical details of photographic
monograph C-8, p. 148. SigC Hist Sec File. (3)
28
Palmer, Wiley, and Keast, The Procurement and Capt William A. Wood, Historical Background
Training of Ground Combat Troops, pp. 499-507. of the Training Division of the Signal Corps Pho-
27
Ltr, CSigO USAFIME to CSigO, 20 Oct 42. tographic Center, Astoria, L. I., 32 pp., passim.
SigC 413.53 Gen 1943. SigC Hist Sec File.
396 THE SIGNAL CORPS
equipment. Next the student began to learn tographers would carry weapons at all
"story coverage," which SCPC considered times, the men learned practical ways to
to be the very heart of his training. After accommodate themselves to the carbine, the
that the student made a series of phantom 45-caliber automatic, and the Thompson
shots out of doors on a controlled problem, submachine gun while packing and using
30
under close supervision. Then he was given their camera equipment.
live film to shoot. Supervision tapered off Another practical institution for training
until he worked independently, but he re- men in photographic work, a contribution
ceived detailed criticism when his material of the Hollywood industry, was a school
was shown on the screen. The next phase established by the Research Council in June
covered simple daily assignments around 1942. There the studio employees who were
New York. The student sized up his assign- selected for assignment to affiliated units re-
ment, planned its coverage, and filmed the ceived additional instruction in still and mo-
story. A critique preceded the next assign- tion picture subjects. Fifty-nine of the in-
ment. Instruction on 16-millimeter cameras dustry's best men donated their services as
and color film followed; then came more instructors. The major studios of Holly-
complicated assignments, editing, and final- wood, Culver City, and Burbank provided
ly working on the actual press assignments. the facilities. The courses included work on
Still picture instruction observed much the the training and educational films which the
same routine, plus classes in darkroom and Research Council was sponsoring for the
laboratory work. Little theory was involved Army.31
and little training literature of any sort was
used until late in the war.29 Combat Photography:
Throughout the specialized training, stu- Early Units and Problems
dents continued their military training, with
special attention to the aspects of field con- The Army originally conceived the role
ditions they might encounter. They built of photography in combat to be that of sup-
hasty fortifications after long marches over port for tactical units. Field photographic
difficult terrain, made overnight bivouacs, units were intended to fill in-the-field re-
learned how to use and to protect their quests by unit commanders for pictures of
equipment under extremes of weather and terrain, weapons, and general intelligence
temperature, and practiced shooting pic- information. Accordingly, war plans were
tures from moving vehicles. They learned drawn to provide each field army with a
the techniques of setting up and using field
30
processing laboratories. They spent a great Wood, Historical Background, p. 27. For more
detailed accounts of photographic training, see
deal of time mastering map reading, for Wood, passim, and the following Signal Corps his-
combat photographers were usually strictly torical monographs: (1) Reinstein, Study of Signal
Corps Enlisted Schooling, 1939-1944, pp. 124-52;
on their own at the front. Since combat pho- (2) Eichberg and Quadow, Combat Photography,
pp. 6-22.
29 31
(1) Ibid., pp. 15-23. (2) TM 1-219, Basic (1) Ruth F. Sadler, History of the Signal Corps
Photography, issued in July 1941, was the only Affiliated Plan (1944), SigC historical monograph
manual available until May 1943. By mid-1943 C-4, p. 101. SigC Hist Sec File. (2) APS Summary
twenty-one additional TM's on photographic sub- Rpt, pp. 403-407. (3) Intervs, SigC Hist Sec with
jects had been issued. Eichberg and Quadow, Com- Col Lawton, Chief of Fiscal Div OCSigO, 5, 8, 9
bat Photography, App. B, Training Literature. Mar 48. SigC Hist Sec File.
PHOTO BY U.S. ARMY SIGNAL CORPS 397
signal photographic company as a part of Panama, Puerto Rico, and Trinidad each
its organic complement. These companies received a team from the 162d. A detach-
contained assignment units for distribution ment left for Newfoundland. Other units
to elements down to and including the divi- moved out to Iceland and to China. Usually
sion. Gradually the concept of the role of the groups consisted of a lieutenant and six
combat photography broadened to include enlisted men—one still picture and two mo-
information on personnel, matériel, condi-
tion picture cameramen, two chauffeurs,
tions, and technique for staff agencies of the 34
and a clerk. Such a detachment sailed with
theater and of the War Department; news
the first large convoy to reach Melbourne.
films and pictures for release to the public;
historical records; and other assigned proj- This group, in charge of 1st Lt. W. L. Van
ects. Thus not all overseas photography was Ness, then went on to New Caledonia, ar-
necessarily combat photography in the riving in March just in time to photograph
strictest sense. This was an important dis- for G-2 the dramatic but bloodless revolt of
32
tinction not always thoroughly understood. the citizens against the Free French Com-
At the beginning of 1942 only two Signal mission.35 On 10 April the 163d Signal
Corps Photographic Companies had been Corps Photographic Company was acti-
36
activated, the 161st and the 162d, both in vated at Fort Sam Houston, Texas. In
the continental United States, except for May a ten-man combat camera unit which
two detachments which had been sent to had been recruited and organized through
Hawaii. Before the end of January a team the Research Council in Hollywood received
from each company sailed for Northern Ire- a month's training with the 162d, and was
land. Thereafter, as other detachments were then transferred with an administrative
sent out, the 162d was quickly denuded of cadre to Camp Crowder to form the 164th
practically all of its skilled men. The photo- Signal Photographic Company.
graphic companies were under the jurisdic- In early August this detachment of ex-
tion of the Army commanders, Army corps, perienced motion picture and still camera-
and G-3 until March 1942, when they be- men sailed for the United Kingdom. There
came a part of the newly organized Army they joined the rapidly expanding Army
Ground Forces, which trained them and di- Pictorial Service organization in London,
rected their operations in the field. Special whose nucleus was the pioneer unit of the
photographic units and teams were com- 162d Signal Photographic Company origi-
posed of the best men available, selected nally landed in Northern Ireland in Janu-
from the photographic companies, the Sig- ary. In June this unit had transferred to
nal Corps Photographic Center, and Sig-
34
nal Corps mobile photographic laboratory (1) Ltr, CG GHQ, US Army to TAG, 23 Dec
41, sub: Division photographic assignment units,
units.33 and 2d Ind, CSigO to TAG, 5 Jan 42. SigC OT
320.3 Aircraft Warning Service. (2) Memo, Lt Col
32
(1) FM 11-22, Signal Operations in the Corps R. T. Schlosberg, Chief of APS, for CSigO, 22 Apr
and Army. (2) WD Pamphlet 11-2, Standing Op- 42. SigC 413.53 Gen, 1943.
35
erating Procedure for Signal Photographic Units Interv, SigC Hist Sec with 1st Lt. W. L. Van
in Theaters of Operation. (3) WD Pamphlet 11-5, Ness, APS OCSigO, 15 Aug 43. SigC Hist Sec File.
36
Combat Photography. AG 320.2 (3-2-42) MR-M-C, 20 Mar 42,
33
APS Summary Rpt, pp. 351-53. sub: Activation 163d Sig Photo Co.
398 THE SIGNAL CORPS
London to set up the APS Laboratory in the officer, two noncommissioned officers, and
basement of a bombed-out building.37 four camera teams, each made up of one
From that headquarters the men covered officer and three motion picture and two
39
spot news and newsreel assignments in Eng: still cameramen.
land, Ireland, and Scotland. Early in Sep- Maj. Anatole Litvak, on duty with Spe-
tember, S. Sgt. Waldo V. Thrasher pho- cial Services, was detailed for 90 days to
tographed the Dieppe raid. Since that was command Group A. Lt. Elton P. Lord of
entirely a British engagement, the British the 163d Signal Photographic Company,
naturally wanted complete control of the Fort Sam Houston, began interviewing pho-
sole Signal Corps cameraman's coverage of tographic personnel from his own organ-
it. Later, however, Thrasher's material was ization, from the Signal Corps Photographic
made into a special newsreel, released Laboratory at Astoria, and from Camp
through the Allied pool to all newsreel com- Crowder, to select men for the camera
panies. The excellence of Thrasher's pic- crews. On 26 September the selected men
tures won him a commendation from Vice assembled at A. P. Hill Military Reserva-
Adm. Lord Louis Mountbatten, who had tion, Virginia, to begin their preliminary
38
led the raid. training and receive instructions for their
mission. Meanwhile, the Chief of Staff had
Photographic Coverage in North Africa directed General Eisenhower to select eight
officers and thirty enlisted photographers
Meanwhile, all planning in late 1942 was from photographic units in the United King-
concentrated upon the imminent invasion dom for immediate amphibious training so
of North Africa. On 17 September the Chief that Colonel Zanuck might organize them
of Staff approved the Chief Signal Officer's into special photographic detachments to
plan for still and motion picture coverage, cover the assault landings and land action
40
designating Col. Darryl Zanuck as the War in North Africa for AFHQ.
Department representative to co-ordinate Early in October Zanuck arrived in Lon-
all photographic phases of the entire opera- don, bringing with him a ton of photo-
tion. Two groups of photographers were to graphic equipment by air priority ship-
be provided, Group A to accompany the ment.41 There was much to be done. Zanuck
Western Task Force, and Group B to be would be attached to AFHQ as nominal
attached to Allied Force Headquarters.
commander of Group B. With the assistance
Each group would consist of a field grade
of Lt. Col. William W. Jervey, director of
37
For detailed account of the APS mission and the Army Pictorial Service on General Rum-
organization in ETOUSA, see U. S. Forces, ETO,
39
Sig Sec, History of the Signal Corps, ETO. 314. Memo, CSigO for CofS, 17 Sep 42, sub: Plan
Military Histories, Vol. 2. Kansas City Rcd Center for still and motion picture coverage of a typical
(C 2946). Additional accounts will be found in opn involving two or more theaters, and Incl 1,
George Raynor Thompson and Dixie R. Harris, The Detailed Plans for Group A and B. SigC 062.2
Signal Corps: The Outcome, a forthcoming volume Photo Coverage of Task Force Activities, 1942.
in this series. OD-20.
38 40
(1) Memo, Stoner for Lawton, 5 Oct 42, sub: Msg, Marshall to USFOR, London, CM-OUT
SigC coverage, Dieppe raid. SigC AC 333.1 Trip, 10219 (9-30-42) R-1410. SigC 062.2 Photo Cover-
Stoner (ETO), Oct 42. SPSAC 5440. (2) Interv, age of Task Force Activities, 1942. OD-20.
41
SigC Hist Sec with 1st Lt Waldo Thrasher, 15 Apr Memo, CSigO for CofS, 30 Sep 42, sub: Air
44. SigC Hist Sec File. priority. File cited n. 40.
PHOTO BY U.S. ARMY SIGNAL CORPS 399
42
bough's staff, and Capt. William H. Rivers, Africa began, and the signal center in the
who was slated to accompany Zanuck to fortress tunnel, the hub of a giant commu-
North Africa for an assignment to AFHQ nications network, became the scene of
as photographic officer, plans quickly took frenzied activity.
form. They provided for two combat assign- Photographers went ashore with the first
ment units from the 162d Signal Photo- assault waves. Some of the cameramen
graphic Company to accompany the troops came in under fire from enemy batteries in
embarking from Great Britain. In addition, the early dawn of 8 November, literally
Zanuck selected several individual photogra- tossed on to the shore by waves which
phers, cameramen, and directors from the rolled eight to twelve feet high along the
United States for special missions, to be coast. Lieutenant Lord, for example, com-
distributed at various places throughout the manding a group which came ashore at
invasion groups.43 Fedala with the Western Task Force, was
From the Army Pictorial Service Labo- in a Higgins boat which overturned in the
ratory in London, Sergeant Thrasher and heavy surf. Lord swam in, bearing his equip-
Cpl. Earl Zeigler, a still photographer, were ment on his back, but salt water and sand
assigned to General Eisenhower's headquar- seeped into his camera, and it stopped func-
ters and moved to Gibraltar early in Oc- tioning after only twenty feet or so of film
tober. They set up photographic facilities in had been run through. Another cameraman
the signal center deep within the Rock. As was the fourth American to step ashore at
staff photographers, Zeigler and Thrasher Safi from the destroyer Bernadou. Still an-
had a vantage point for the many important other attached himself to an infantry group
events that followed in the next few weeks. detailed to knock out a machine gun nest.
They made the first photographs ever taken One was caught behind Fort du Blondin
inside the fortress of Gibraltar; they photo- in a barrage laid down by the United States
graphed the first Flying Fortresses and the Navy. By that time it was light enough to
first P-38's to land on the Rock; the first take pictures, and he photographed the tak-
paratroopers to land there; pictures of Gen- ing of the fort.45 Photographing their way
eral Eisenhower and his staff when they ar- eastward, the cameramen joined Colonel
rived ; and, most significant of all, the take- Zanuck in Algiers and turned over their pic-
off on D Day for the invasion of North tures of the amphibious invasion. All to-
Africa.44 gether, Zanuck sent 5,000 feet of war film
On 5 November Colonel Zanuck accom- back to London.
panied General Eisenhower and his staff Zanuck's mission was twofold in that he
who crowded into six Flying Fortresses and was charged not only with initial co-ordina-
headed for Gibraltar to await D Day. On tion of photographic coverage of the inva-
8 November 1942 the battle for North sion, but also with gathering material for
the second film of the War Department his-
42
Chief Signal Officer, ETOUSA. torical series, At the Front in North Africa.
43
Sig Sec AFHQ, History of the Signal Section, Although he had authority to distribute his
Allied Force Headquarters, 24 July 1942-10 No-
vember 1945 (1945), p. 8, and App. F, Historical men as he wished, the scarcity of photogra-
Report of the Photographic Division. SigC Hist Sec
45
File, A47-200, Drawer 15. Ltr, Lord to Schlosberg, 21 Apr 43. SigC AS
44
Interv with Thrasher, 15 Apr 44. 062.2 Prod, 1942-46, Theaters of Opn.
400 THE SIGNAL CORPS
phers was a thing that could not be over- edit the picture. His comment foreshad-
come by directives. He dropped his camera- owed the lack of enthusiasm with which
men off in pairs along the 600-mile front At the Front in North Africa was received:
as the Allied drive toward Tunis began; "I don't suppose our war scenes will look as
thus the entire front had equal, if sparse, savage and realistic as those we usually
coverage. From Algiers through Bougie, make on the back lot, but then you can't
have everything."46
Djidjelli, Phillipeville, Bone, Souk Ahras,
Chardimon, Souk el Arba, Beja, Medjez el Problems of Organization
Bab, Tebourba, and close to Tunis the cam-
eramen moved with the major fighting units. North Africa provided a testing ground
The Allied drive stalled short of Tunis in for photographers no less than for other
December. Zanuck drove back to Bone, then Signal Corps specialists. In the weeks and
flew to Algiers, arriving on 5 December. In months that followed, cameramen learned
conference with Army Pictorial Service of- much and applied the lessons so well that
ficers stationed there, he mapped out plans eventually the Signal Corps combat pho-
for future photographic coverage of the tographers earned hearty praise on almost
campaign, then went on to Oran, where he 46
Day by Day Recollections, a 64-page report sub-
collected more film footage, then back to mitted to the CSigO by Zanuck, 18 Dec 42. SigC
AS 062.2 Notes of Col. Darryl Zanuck, N. A. Mis-
Gibraltar, and on to the United States to sion, 1942.
PHOTO BY U.S. ARMY SIGNAL CORPS 401
47
every front. There were, however, certain perform satisfactorily. Better results, he be-
elements inherent in the organization and lieved, could be accomplished by a few pho-
operations of photographic companies that tographic technicians organized into units
needed changing, as the first months of consisting of not more than five still and
combat indicated. five motion picture cameramen dispersed to
As it existed in 1942, a Signal Corps areas of action with full authority to carry
photographic company was composed of out their particular missions. He had recom-
four elements, or general assignment units, mended the organization of such units for
as they were called. The type A camera unit immediate dispatch to England, and for use
took still and silent motion pictures of mili- in other theaters as well.49 His experience in
tary operations in combat areas for news use. filming At the Front in North Africa had
The type B, or newsreel unit, with the same demonstrated the advantages of flexibility in
mission, was equipped with a single-system, the deployment of photographic troops.
sound-recording, motion picture camera for The tables of organization for photographic
recording interviews, sound effects, and companies remained fixed during the first
so on. Then there were two laboratory units, year of the war, however, and it was not
A and B. The first was designed to operate until well into 1943 that a move for a more
at or near corps headquarters in the forward flexible photographic troop structure gained
areas to provide camera and developing impetus.
service for military intelligence, supply, and In the meantime, in actual practice com-
like purposes, while the type B laboratory pany strength was scattered far and wide
unit provided similar service near army in small teams and detachments as needed.
headquarters in forward areas. Neither de- The cameramen found almost immediately
veloped news pictures, but sent them to the that in combat they could not work advan-
48
rear area laboratories by the fastest means. tageously in larger groups. For one thing,
Wherever military laboratories for process- they duplicated coverage; for another, it was
ing film were not available, it was rushed to a useless risk of life. Photographic officers
the Signal Corps Photographic Laboratory in North Africa therefore split their detach-
at Washington or to the Signal Corps Pho- ments into teams of one still and one motion
tographic Center on Long Island. Com- picture technician, two men to a jeep
mercial laboratory facilities were used in when they could get such a vehicle. For mo-
some theaters where they were available. bility in covering a battle, jeeps were far
When Colonel Zanuck surveyed photo- superior to panel trucks and carryalls.
Weapons carriers proved to be the ideal
graphic needs and operations in the United
supply vehicles.
Kingdom in the summer of 1942 he became
The cameramen found that when com-
convinced that such companies could not
manders were co-operative and briefed
47
For examples of Signal Corps still photographs
them on where and when a battle might be
from the North African campaign, see The War expected, they could often set up their
Against Germany and Italy: Mediterranean and equipment in what they hoped would be
Adjacent Areas, UNITED STATES ARMY IN
WORLD WAR II (Washington, 1951), pp. 1-93.
an advantageous spot and wait for the fight-
48
Memo, Col Gillette, AFHQ, OCSigO, for Chief
49
of APS OCSigO, 6 Oct 43. SigC 413.53 Gen, 1 May Ltr, Zanuck to CSigO, 29 Jun 42. SigC AS
43-31 Oct 43, Pt. 2. 333.1 Rpts of Inspec Trips (Zanuck, May-Jun 42).
264-211 O - 78 - 27
402 THE SIGNAL CORPS
ing to come to them. They learned not to hind the lines. German soldiers in captured
move with convoys, which were favorite tar- uniforms might enact the parts of Allied
gets for strafing, but to stand off to one side troops, and stock scenes be released in lieu
and photograph the strafing. In moun- of fresh battle coverage. The false impres-
tainous regions where vehicular travel was sions which such scenes created usually
impossible, they scaled cliffs or followed goat caused only amusement when shown to the
trails for miles to get their pictures, often troops, although there were times when they
shooting their way out of tight spots with drew bitter comments; for example, when
guns, not cameras. pictures playing up assured supply lines were
shown to soldiers on short rations. Neverthe-
They learned by experience what was
less, there were at least two features of the
needed in the way of equipment, and calls
enemy photographic organization which ap-
began to come into the Army Pictorial Serv-
pealed to American cameramen. The most
ice from all areas for more Eyemos, Bell and pleasing element was the prominence ac-
Howell 16-millimeters, Speed Graphics, and corded the German photographers, who,
especially Leica or Contax cameras. Lack- regardless of their rank, were in command
ing the ideal, they improvised. "To give us of their groups during operations and who
50 feet of extra film and to make a long shot were completely free to photograph any
and a close-up possible when time is so val- scene or object they desired. Also, German
uable, we have taped two B&H 16's together photographers seldom remained long on one
with the three-inch lens on top and the one- assignment under the theory that a fresh
inch lens on the bottom. . . . This makes viewpoint resulted in better pictures, and
loading with the mags possible and the extra some U. S. Army photographers held this
50 feet is a Godsend." With a one-inch lens same view. Moreover, under the German
they had to get in the middle of a battle to scheme for portraying the war, it was easier
picture it, but with the larger lens they were for an inexperienced photographer just out
of training school to turn in acceptable ma-
able to film it from the fringes. Tank action
terial than it would have been had he been
was particularly difficult to picture effec-
required to record authentic combat ac-
tively because of the distances between
tion.51
tanks, which ranged from 2,000 to 5,000
The United States Army expected more
feet.50
from its cameramen but gave them less
In contrast to the U.S. Army's photo-
freedom of action. Many U. S. cameramen
graphic organization, the German Army's
found that more spectacular scenes oc-
photographic troops operating in North
curred in training areas than in actual com-
Africa were in reality propaganda groups
bat, where too often a photographic
which operated in teams of one still and one
vantage point was occupied by the enemy
motion picture photographer, a radio com-
and infantrymen were forced to hide and
mentator, one or more reporters, and so on.
dodge behind bits of cover, advancing as
Much of the action recorded was staged be-
they could, man by man. Dispersion was a
50
Ltr, Lt Lord, 2625th Sig Sv Regt, to Col
51
Schlosberg, APS OCSigO, 21 Apr 43, no sub. Mil Attache Rpt from Cairo No. 4544, 16 Jul
SigC AS 062.2 Theater of Opns, 1942-Feb 46. 43. I. G. No. 6585.
PHOTO BY U.S. ARMY SIGNAL CORPS 403
safer if not photogenic tactic. Soldiers no Much of the difficulty lay in the fact that
longer made massed charges as they had in the duties of photographic officers had not
the days of San Juan Hill. Like Colonel been spelled out clearly for their own in-
Zanuck, who had voiced misgivings as to formation, or for that of the commanders
how At the Front in North Africa would under whom they served.53 Both needed to
be received, many cameramen overseas know why the pictures were being made,
learned that filming a staged battle not only what should be photographed, what use
brought fewer harrowing experiences but would be made of the pictures, how they
it produced a picture which would probably should be shipped, and so on. A direct flow
have more reality on the screen than the real of information back and forth between the
thing. The Army's combat pictures had not Army Pictorial Service and camera units
caught the elusive something which Gen- overseas could have eliminated many diffi-
eral Marshall had wanted when he had culties, but there were many intervening
sought Colonel Zanuck's advice on how to headquarters between Washington and the
make training films more realistic. Genuine combat cameraman, and "channels" were
war scenes were not the answer. unknown quantities which the cameramen
dreaded. "The channels in between would
Problems of Command naturally get it all screwed up," voiced a
common attitude. A young photographic
Like other specialists, photographic tech- officer at an overseas headquarters wrote
nicians assigned to troops were subject to to the APS in Washington to say: "Before
the orders of field commanders. Under- I left the U.S.A., ... I had heard the
standably, photographic coverage of the term, but that was all. ... If you can give
war occupied a very secondary place in the me some good straight dope on what Wash-
interest of commanders charged with com- ington expects us to do, you can bet I'll ap-
bat responsibilities. The Chief Signal Offi- preciate it." 54
cer observed that "the provision of combat The Army Pictorial Service headquar-
films for publicity and staff study purposes ters in Washington also believed that the
was seriously impaired by the fact that sig- unsatisfactory performance of cameramen
nal photographic companies, when trans- overseas could be attributed in part to a
ferred overseas, passed to the complete con- lack of both the general and specific direc-
trol of theater commanders." 52 Until the tion necessary to do a good job. APS was
value of photography in tactical operations much concerned over the relatively poor
was proved, commanders tended to regard showing its combat cameramen were mak-
cameramen purely as publicity agents, and ing. Over a 40-day period in early 1943,
assigned them to the staff public relations APS had received from theaters of opera-
officer. Hence, complaints were heard that tion some 95,000 feet of 35-mm, and 37,000
the cameramen lacked news sense, and were feet of 16-mm, film, of which only 10 per-
too often dominated by public relations offi- cent was considered to be of sufficient in-
cers intent on making news of the command-
ing general instead of the war. 53
Ltr, Zanuck to Lawton, 5 Sep 42. SigC AS
413.53 Alaskan Dept, 1942-44.
52 54
Ltr, CSigO to CG SOS, 7 Jan 43, sub: Proper Ltr, Charlie Dourro, APS Officer USAFFE to
photo coverage of activities within theaters of opns. "Charlie" (probably Col Charles S. Stodter, APS)
SigC 062.2 Photo Activities, 1942-43. OD-27. 14 Mar 43. SigC 413.53 Gen, 1943.
404 THE SIGNAL CORPS
terest to warrant requests for prints. APS Desirable as it might be, such a program
contended that the specialized nature of even if accepted by AGF could not be ex-
photographic activities called for "specific pected to produce results immediately. In
continuity of directions, clearly defined cov- the long-range applications, many of the
erage, proper transportation for camera APS recommendations were accepted even-
crews and equipment, and advance infor- tually, with good results. Meanwhile for
mation on important and outstanding some time there continued to trickle in re-
events to be covered." 55 It recommended ports such as the one General Somervell
that specific channels of command in thea- passed along to the Signal Corps in August
ters of operation be established, specifically 1943. It stated that at one base, out of
that a qualified ranking officer be assigned 4,000 pictures, more than 2,500 were of
to the general staff of theater commanders, the commander "eating lunch, picking
charged with responsibility for photographic roses ... or what have you"; the rest of
activities in that theater. 56 This recom- the 4,000 pictured the public relations offi-
mendation bore fruit a few weeks later cer.59 Maj. Gen. Harry C. Ingles placed
when the War Department directed the that complaint in proper perspective. If
overseas commanders to designate a staff that were true, he said, "it calls for the
officer, to be assigned to the staff of the the- reprimand of the commanding general, as
ater commander and charged specifically he certainly has the authority to stop this
with the staff functions connected with practice any time he sees fit." Nearly all
photographic activities.57 commanders and their staffs were ignorant
In addition to establishing a more clearly of the function a photographic section was
defined chain of command in overseas thea- to perform, as established by law and regula-
ters, the APS believed that it was necessary tions, said Ingles, adding that he knew of
to bring specialist training of photographic but one directive that had ever been issued
companies, units, and individuals to a controlling photographic activities, and that
higher standard through joint action by the one he himself had issued when he was chief
Army Ground Forces and the Army Pic- of staff of the Caribbean Defense Com-
torial Service. The specialist training which mand. "I do not believe that either you or
the Signal Corps gave at Astoria, argued I, or anyone else in Washington can satis-
APS, ought to be co-ordinated with the factorily decide what pictures should be
later mobilization training which the AGF taken in England, Africa, Sicily, Middle
gave photographic companies. Methods, East, Persian Gulf or India . . . the re-
courses, and doctrine should be consistent.
spective commanding generals have ample
When ordered to theaters of operation, in-
staff machinery to do this, but they turn
structor teams should accompany the Signal
the matter over to a public relations officer,
photographic companies to train secondary
personnel and replacements.58 and he interprets his duty to be the collection
55
of all possible pictures for publicity
Staff Study, Field Photography, prepared by
APS, 22 Apr 43. SigC 062.2 Policy, Combat Pho- purposes." 60
tography, 1942-44.
56 59
Ibid., p. 12. Memo, Somervell for Ingles, 25 Aug 43. Hq
57
AG 210.31 (4-29-3) OB-S-D-M, 6 May 43, ASF SigC File.
60
sub: Fld Photography. Memo, Ingles for Somervell, 27 Aug 43. SigC
58
Staff Study, Field Photography, pp. 3-11. AS 319.1 Rpts Photo Activities, 1942-44.
PHOTO BY U.S. ARMY SIGNAL CORPS 405
This problem, like others, yielded to time was secret and what was not. Often unit
and experience. The greatest single im- commanders themselves did not know. A
provement in this matter came as a result tank spitting fire at the enemy on unrecog-
of the appointment of the staff photographic nizable terrain was a good combat shot, and
officers mentioned above. from the cameraman's point of view there
was nothing about such a scene that could
Photographic Security give aid or comfort to the enemy. But Dr.
Vannevar Bush, Director of the Office of
A problem which affected the operations Scientific Research and Development,
of combat cameramen overseas concerned pointed accusingly to just such a picture
security. In the field, before exposed film which had appeared in a large daily news-
was processed, it was automatically re- paper early in the war. It revealed, he said,
garded as "confidential," unless it was that infra-red equipment was being used
known to contain shots of material which and anyone familiar with the uses of infra-
would warrant a higher classification. After red might deduce from the position of the
film was processed, prints were sent to equipment quite a little as to what was
Washington, where, a month after Pearl under way on a classified Army project.63
Harbor, the Secretary of War had estab- If pictures were innocent, often the cap-
lished the War Department Photonews tions told too much. There were many ways
Board. Its duties included the review of in which pictures could violate security.
newsreels and stills from all war theaters, For example, At the Front in North Africa
and the selection of materials, subject to the contained a scene which showed a burning
approval of the Bureau of Public Relations, plane. A label on the cap of the fuel tank
for release to the public. Still pictures were revealed the brands of German and Italian
classified overseas at the point where they gasoline which might safely be used in it,
were processed.61 thus giving an inkling of the nature of the
The cameramen's difficulties with security plane's engine. As this was a German plane,
reached further back in the chain of opera- the scene might be shown, but had it been
tions. It was not always possible to reconcile an Allied aircraft, the danger of publishing
photographic objectives with the security the picture is obvious.
64
directed the Signal Corps Photographic contracting. APS's contracting activities ex-
Center to establish the Pictorial Engineer- tended only to the purchase of still and mo-
ing and Research Laboratory (PERL) at tion pictures and raw film stock.86
Astoria.84 Its responsibilities would include
conducting tests and experiments on all Still Pictures
types of photographic material, preparing
and revising specifications for new and The production of the Army's official still
existing equipment, submitting military photographs constituted an important por-
characteristics for, and standardizing, pho- tion of the work of the APS. This duty, like
tographic equipment and supplies, and the others, increased enormously during the
preparing the necessary instruction publica- first eighteen months of war, although the
tions and manuals. staff to accomplish it did not swell propor-
PERL began operations in one small of- tionately. For example, the figures for Sig-
fice room at the Center. Its staff of three nal Corps Photographic Laboratory person-
officers and two secretarial assistants con- nel—civilian, enlisted, and officer—stood
centrated at first on making procurement at 157 on 30 June 1942, and at 222 on 31
tests of equipment and on writing procure- May 1943.87 Included in these figures were
ment specifications and technical literature. the enlisted men of Company B of the 846th
This first organized attempt to test and pro- Signal Service Photographic Battalion,
cure photographic equipment for purely which had been activated at Astoria on 11
military uses soon branched out into studies September 1942 to perform various head-
of maintenance problems, incidence of fail- quarters photographic duties.88
ure, and the procurement of replacement Before war struck, the volume of still
parts. Thereafter, throughout the war, the photographs coming in to the still photo-
Signal Corps possessed a laboratory devoted
graph library had shown a decided upward
trend. As Army inductees poured into train-
to the specialized job of research into pho-
ing camps all over the country, newspapers
tographic equipment problems—a labora-
and magazines clamored for pictures show-
tory that eventually became a major center ing how the men lived and trained. These
85
of research and development in this field. pictures swelled the files of the still photo-
Although general responsibility for pro- graph library. The first pictures received in
curement of photographic supplies rested World War II were of the Japanese attack
with APS, the procurement districts of the at Pearl Harbor, and showed the bomb
Signal Supply Service handled the actual damage to Hickam Field and a small Japa-
nese one-man submarine that was washed
84
Ltr, Col Lawton, Deputy Chief of APS, to CO up on the shore.89
SCPC, 11 Apr 43, sub: PERL. SigC 413.53 Gen
86
1943. Memo, Exec Officer OCSigO for Chief of APS,
85
Maj Lloyd T. Goldsmith [Dir of PERL Div 22 Apr 43, sub: Proc of photo supplies and equip,
SCPC] "Pictorial Engineering and Research," Busi- still and motion pictures. SigC DS (Harrison) Proc,
ness Screen, VII: I (December, 1945). Typical APS.
87
PERL projects included adaptation of motion pic- CSigO, Annual Report, 1943, p. 486.
88
ture camera PH-330, which became a basic piece of (1) APS Summary Rpt, p. 118. (2) Signal
Signal Corps equipment and which accounted for Corps Information Letter, No. 13 (December,
90 percent of all combat footage shot during the 1942), p. 19.
89
war, and the development of the new, lightweight Maj Frank Muto [SCPC], "Still Pictures," Busi-
combat camera, PH-530/PF. ness Screen, VII: I (December, 1945).
412 THE SIGNAL CORPS
Thereafter the volume of overseas pic- job that quickly grew to major proportions,
tures increased steadily. By the close of the for 123 new still laboratories were estab-
fiscal year on 30 June 1942, the still library lished before the end of June 1943. APS
had received 16,000 new negatives. The arranged to admit a limited number of serv-
number nearly doubled during the next ice command photographers to the Signal
twelve months as the tempo of the conflict Corps Photographic Center at Astoria for
quickened; 28,000 new negatives for the advanced training and instituted a still
twelve months ending 30 June 1943.90 By photographic laboratories production re-
then the library's collection numbered alto- port, which showed the number of pictures
gether about 190,000 negatives. So many made and the material used, in order to be
pictures were coming in from overseas that able to estimate future equipment and sup-
the Still Picture Library Branch established ply requirements.93
a temporary overseas picture file for official Meanwhile, the Signal Corps' own Pho-
reference use, to serve until the pictures tographic Laboratory, particularly the new
could be classified and filed in the perma- sublaboratory for still pictures in the Penta-
nent collection. Putting captions on pictures gon, acquired new and improved equip-
and issuing them promptly to the appro- ment to help handle the work load
priate service—AGF, AAF, or ASF—re- expeditiously. The Casablanca conference
quired a great deal of routine work, but it in January 1943 furnished an opportunity
was important that prints be furnished for to demonstrate this fact. The Still Picture
technical study and training to Army activi- Section received 226 4x5 negatives, two
ties all over the country. An additional serv- reels of 35-mm. negatives, and 85 koda-
ice that the Still Picture Branch instituted chromcs of President Roosevelt, Prime Min-
at this period was a critique on the news ister Churchill, and other notables at Casa-
value and technical quality of the negatives blanca. The laboratory's technicians de-
received from overseas. This was of great veloped the negatives and delivered 900
value to the cameramen overseas, who as prints to the Bureau of Public Relations for
often as not had no opportunity to see their release, all within the record time of seven
94
own pictures or to learn what their mistakes hours. Publicity pictures of special events
or successes might be.91 like this spotlighted the work of the labora-
When in mid-1942 the corps areas (later tory, but it was the thousands of day-to-day,
called service commands) were authorized routine tasks that spelled the real measure
to establish photographic laboratories and of accomplishment.
sublaboratories to provide photographic de-
veloping and printing facilities at posts, Distribution of Training Films
camps, and stations, the Still Picture Branch
of APS acquired an additional duty—staff The Signal Corps distributed the Army's
supervision of the laboratories.92 It was a training films, film strips, and film bulletins
90 93
CSigO, Annual Report, 1943, pp. 478-79. (1) Signal Corps Information Letter, No. 7
91
Ibid. (June, 1942), p. 51. (2) CSigO, Annual Report,
92
Still Picture Branch later became Field Activi- 1943, pp. 338, 478-79.
94
ties Division. See Chart 330, Functional Organiza- Signal Corps Information Letter, No. 17 (April,
tion Charts, 31 Jul 42. SigC Hist Sec File. 1943), p. 46.
PHOTO BY U.S. ARMY SIGNAL CORPS 413
through a system of central film libraries in SOS and the Office of the Chief Signal Of-
the corps areas and sublibraries in desig- ficer in late 1942 indicated that training
95
nated posts, camps, and stations. When a films still were not being used as effectively
new training film was approved by the as they should have been. There were
initiating agency for distribution, the Chief several reasons. Neither the APS, nor the
Signal Officer consulted the appropriate Training Division, SOS, nor the corps areas
training division to find out exactly how and had enough officers to assign a sufficient
where the film would be used, where it number to the work of promoting the Army's
would be shown, and the number of troops training films. Usually an officer assigned
for whom it was intended. On the basis of to a film library had other duties as well.
this information the Signal Corps printed FM 21-6, which listed the available films,
the required number of copies of the film was published only twice a year and fell
and distributed them to the libraries through badly behind schedule at that, so that the
its Film Distribution Branch.96 lists it contained were seldom up to date.
At the onset of war the Signal Corps had There was also an acute shortage of pro-
been drawn into the twilight zone between jectors, which were controlled items and as
two disparate but closely related functions: such issued only on priorities. Film librar-
that of providing training films, a supply ies had no such priorities. Furthermore,
function, and that of the use of films, a there was no relationship between the issue
command function. The training film was of films and the means for showing them.
a relatively new device and very little use Projectors were issued according to the
had been made of it either inside or outside tables of basic allowances, whereas the dis-
the military establishment. Therefore the tribution of films and film strips to libraries
War Department felt that some agency had was covered by AR 105-260.97
to be designated to demonstrate how motion In March 1943, therefore, the War
pictures could be used in training. Soon Department transferred to the service com-
after Pearl Harbor the Signal Corps had mands Signal Corps' responsibility to pro-
been instructed to furnish personnel to vide consultant and advisory services on the
demonstrate effective techniques in the use utilization of training films.98 This responsi-
of visual training aids. bility included operating the film libraries,
Although a great deal was accomplished which by this time numbered some 200,
during the first year of war, a joint survey supplemented by at least 100 auxiliaries
conducted by the Control Divisions of the attached to post libraries at the larger in-
stallations.
95
Except for the AAF, which distributed its own During the following months the APS
training films. Special Services Division, SOS, dis-
tributed Army orientation films and informational and SOS kept a constant check on the op-
films, and the War Department Bureau of Public
97
Relations distributed films designed to promote in- Survey of Distribution of Training Films and
dustrial morale. APS Summary Rpt, p. 362. Film Strips, Control Div SOS and Control Div
96
So designated as of 31 May 1943. It was origi- OCSigO, 26 Nov 42-8 Dec 42. SigC EC 062.2 Tng
nally activated 20 December 1941, as the Visual Films, 1942-43.
98
Aids Section, and redesignated the Film Distribu- WD ASF Memo S105-14-43, 22 Mar 43, sub:
tion and Utilization Branch on 17 June 1942. Tng film program.
414 THE SIGNAL CORPS
erations in the service commands." A visual film libraries.100 At the same time APS
aid Co-ordinator in the Eighth Service Com- moved to reorganize its own distribution fa-
mand made an intensive study of condi- cilities in order to provide better and faster
tions in that command. By May 1943 the service. The new arrangement, effective 1
APS was ready with recommendations July 1943, consolidated distribution opera-
which it presented to representatives of the tions in the Signal Corps Photographic Cen-
nine service commands, the AAF, and the ter. The Film Distribution Branch of APS
in Washington was responsible for staff su-
AGF at a two-day conference held at To-
pervision and policy matters only.
ledo, Ohio, 28-29 May. The recommenda-
tions were aimed at two principal objec-
tives—to arouse in service command officers Orientation Films
a greater sense of responsibility for the Orientation films were training films of
proper utilization of training films, and to a special category. When war came the Bu-
set up a uniform system of procedures in reau of Public Relations, War Department
99
General Staff, had a corps of speakers busy
(1) Memo, Chief of APS for CG AGF, 22 Apr
43, sub: Inspec of photo activities; (2) Memo, Col
traveling over the country delivering lec-
D. E. Liston, SOS, for Dir of Tng SOS, 14 May 43,
100
sub: Inspec of tng film activities at Third, Fourth, Summary of Recommendations, contained in
and Eighth Sv Comds. SigC DS (Harrison) APS, Get 'Em Into Action!, booklet prepared for Toledo
Fld Instls. conference. Copy in Harrison Files, DRB AGO.
PHOTO BY U.S. ARMY SIGNAL CORPS 415
tures to troops on the general theme of why scenes. Film from the files of Fox Movie-
they were being called upon to fight. The tone, Pathe News, the Allied embassies, the
background of world events which led to Museum of Modern Art, impounded en-
war was a fascinating subject to historians emy film, and privately owned collections
and students of world politics, but to sol- went into the making of these reels.103
diers bone-tired from their initial encoun- Prelude to War, the first of the Why We
ters with basic training it proved baffling, Fight series (in French and Spanish versions
bewildering, or just boring. In any event, also), was issued in October. Others fol-
lectures were too slow, too limited, to meet lowed at intervals throughout the war: The
the demand for mass indoctrination. Nazis Strike (in French also), Divide and
The Chief of Staff, General Marshall, Conquer, Battle of Britain, Battle of Russia,
already enthusiastic about the technique of Battle of China, and War Comes to Amer-
training through the medium of motion pic- ica.104 On 6 June, at the direction of the
tures, was eager to extend the project to Commanding General, Services of Supply,
include orientation films for troops. On 9 the 834th Signal Service Photographic De-
December 1941 Brig. Gen. F. H. Osborne, tachment, a highly efficient unit comprising
Chief of the Morale Branch of the War De- initially eight officers and thirty-five enlisted
partment (later designated Special Serv- men drawn from the various technical fields
ices ), called Colonel Schlosberg of the Army of the motion picture industry on the west
Pictorial Service to discuss the matter with coast, was activated especially for the pur-
him, and Schlosberg agreed to try to find pose of producing the orientation films in the
a qualified person from the motion picture Why We Fight series. This detachment,
industry to be commissioned in the Signal commanded by Capra, operated at first, not
Corps to direct a series of orientation under the Chief Signal Officer, but under
films.101 the jurisdiction and direct control of the
Frank Capra, a successful Hollywood pro- Chief of Special Services, the Signal Corps'
ducer-director, agreed to undertake the responsibility being limited to supplying the
work. Capra was commissioned as a major in technicians and to assisting upon request.105
the Signal Corps on 14 February 1942 and On 1 September 1943 the memorandum as-
placed on duty in the Morale Branch as chief signing the 834th Signal Service Photo-
of its film production section.102 By the end of graphic Detachment to Special Services was
April Hollywood writers under Capra's rescinded, and thereafter the Signal Corps
guidance had completed a series of scripts produced films for the Special Services Divi-
based primarily upon the Bureau of Public sion upon its request in the same manner as
Relations lectures. About 80 percent of the 103
Memo, Chief of Spec Sv SOS for Chief of Adm
film footage was obtained from newsreels Sv, 23 Apr 42, sub: Orientation films. SigC APS
and other library sources; the remainder Policy Book 2.
104
comprised animated maps and staged (1) WD Cir 368, Sec. IV, 9 Nov 42. (2)
Clarke, Signal Corps Pictorial Service in World War
101
APS Summary Rpt, p. 412ff. II, pp. 221-24.
102 105
One of the three sections of the Information Memo, CG SOS for CSigO, 2 May 42, sub: Es-
Division, headed by Col. E. L. Munson, who was to tablishment of SigC detachment under jurisdiction
become the chief of the Army Pictorial Service in the and direct control of Chief of Special Svs. ASF Con-
Office of the Chief Signal Officer in July 1944. trol Div File, Sig Officer, Office of Chief.
416 THE SIGNAL CORPS
for other agencies in the Army Service Forces and make the arrangements for the film.
106
or for the Army Ground Forces. The work of completing the film he left to
The orientation films were highly success- the direction of Lt. John Huston, assisted
ful, and were shown not only to soldiers, but by Lts. Jules Buck and Rey Scott and two
at special showings to other groups including enlisted men. One of the greatest obstacles
some of the individuals who had been lead- to filming action in the Aleutians was the
ing participants in the events portrayed.107 weather. Before leaving Umnak, Zanuck
Capra's group soon undertook a second made one unsuccessful flight over enemy-
series, closely related to the orientation films, held territory, an experience duplicated sev-
the Know Your Enemies and Know Your eral times by Scott and Buck before they
Allies series. John Gunther, William L. succeeded in getting over Kiska on a clear
111
Shirer, John Whittaker, Leonard Spigel- day.
glass, and Eric Knight wrote the scripts for The Aleutians picture, which ran to some
Know Your Enemy Japan, Know Your En- 1,680 feet of 16-mm. and 4,200 feet of 35-
emy Germany, and Know Your Ally Brit- mm. film, was shown officially just as the
ain. The last-named film was so effective cameramen made it. But before its release
from the British point of view that Prime for public showing some of the scenes had to
112
Minister Winston Churchill had it shown in be deleted for security reasons. Scenes of
all the British theaters.108 All together, the landing on Adak had been returned to
Capra produced seventeen excellent feature the United States for editing before the Jap-
films, at the rate of one about every two anese were believed to be aware of the occu-
months, during the approximately three pation of the island by United States forces,
years he was assigned to this work.109 the Canadian customs officials having agreed
to pass the shipments of film without exami-
113
The Historical Series nation of the packages.
The Report, in technicolor, recorded in
The first of the War Department histori- unforgettable detail how American men oc-
cal record series of feature films, designed to cupied Adak, the American outpost farthest
be shown to the civilian public, was Report out and closest to the enemy, barren of life,
from the Aleutians.110 In mid-summer of except for its grotesque scavenger ravens. It
1942 Colonel Zanuck flew to Umnak, the showed what ingenuity had gone into the
springboard for launching aerial and conversion of Adak for use as a military
ground action against the Japanese on post—a lagoon became a steel-surfaced air-
Kiska. His mission was to plan the coverage field in eleven days, ready for American
106 111
Memo, CG ASF for CSigO, 4 Aug 43, sub: (1) Ltr, Zanuck to CSigO, 5 Aug 42, sub:
Proc of films for Spec Svs Div. ASF CofS File, Sig Photo survey of Alaska and Aleutian Islands, and
Officer, Office of Chief. establishment of a SigC APS unit within the ADC;
107
Speech, Gen Marshall, Lessons of History, (2) Memo, CSigO for TAG, 14 Sep 42; (3) Ltr,
Princeton University, 17 Nov 49. Zanuck to Olmstead, 25 Aug 42. SigC AS 413.53
108
Ibid. Alaskan Dept, 1942-44.
112
109
Clarke, Signal Corps Army Pictorial Service SigC Projs. 3800, 3801, 3802, passim.
113
in World War II, p. 221ff. (1) Ltr, Scott to Schlosberg, 16 Sep 42; (2)
110
42, sub:
Ltr, CSigO
War Department
to CO Western
Historical
Br, SCPC,
Record19
Series.
Dec Ltr, Actg Commissioner of Customs, Treasury Dept,
to Maj Lambert, APS OCSigO, 3 Sep 42. SigC AS
SigC Proj. 3800, 3801, 3802. 413.53 Alaskan Dept, 1942-44.
PHOTO BY U.S. ARMY SIGNAL CORPS 417
bombers to take off to raid Kiska. It showed rated no dramatized material; no studio ef-
how weather dictated the terms of life and fects were employed to enhance its appeal.
action and how it affected the labors of the Its war scenes were real, but they did not
two photographers who landed there in a look real to the public. A British film being
slashing rainstorm. It showed the daily shown at about the same time contained
bombing missions against the enemy; bomb- studio-filmed scenes of night attacks, and
ers landing in blinding spray on a field scenes patched together from captured en-
emy reels which had no connection with the
flooded with a foot of water; returning with
subject campaign. These professional tricks
wings made filigree by flak and with holes in
resulted in a more dramatic picture. The pol-
their sides large enough for a man to put his
icy of the War Department, however, was to
head through; a crash landing, with the am-
use no such studio aids unless the artificial
bulance crew going into action; a funeral,
or re-enacted scenes be edited in such a man-
bleak scene in a bleak land; Sunday church
ner as to segregate the staged from the actual
services in the open. The exact details of a
scenes, with explanatory titles defining
bombing mission were filmed: briefing and
clearly the line of demarcation. The Signal
loading, the flight to Kiska, the formation of
Corps believed that such explanations would
the bombing run that permits exact bomb-
detract from the continuity of a film to such
ing, the attempts of the enemy to throw the
an extent as to be unworkable and therefore
planes out of their run, three bombing flights
held to the policy of showing only authentic
at different altitudes above Kiska with the
scenes.115
cameraman's plane rocking with the impact
Throughout the war campaign reports
of antiaircraft fire, and the safe return of all
and historical films were made available
nine bombers after the destruction of Kiska's
through the Office of War Information and
hangars. These were the elements of Report
the War Activities Committee of the Motion
from the Aleutians. Absorbing as the best
Picture Industry for showing in commercial
fictional dramas, this picture carried exact
theaters. Eve of Battle, the story of the inva-
information and the cameramen had caught
sion of Europe, was an example of this sort
the very texture of war.
of film. It was shown throughout the coun-
The second of the series, At the Front in
try within a few days after D Day in Nor-
North Africa, was not so well received. It
mandy. A general letdown in war production
was compiled from combat film footage
in the summer of 1944 was met by the re-
taken by groups of Signal Corps photogra-
lease of the film, This War Speeds Up. The
phers under Colonel Zanuck's direction dur-
Liberation of Rome, released about the mid-
ing the first weeks of the North African cam-
dle of 1944, also received wide public show-
paign. At best, it could show only a fraction
ing. The Enemy Strikes followed the Ger-
of the effort expended in a campaign, and
man counteroffensive in December 1944.116
for that reason was open to charges of super-
ficial or inaccurate coverage.114 It incorpo- 115
Memo, Code for Chief of APS ASF, 25 Mar 43,
sub: Combat films. SigC 062.2 Policy, Combat Pho-
114
Ltr, Brig Gen Richard B. Moran, Sig Officer tography, 1942-44.
116
Fifth Army, to CSigO, 27 Jul 44. SigC AS 062.2 Clarke, Signal Corps Army Pictorial Service,
North African Theater of Opns, Pt. I. pp. 213-14.
264-211 O - 78 - 28
418 THE SIGNAL CORPS
Industrial Incentive Films prints of the films in Allied and neutral
countries through its Overseas Film Divi-
Still another film series, which the Signal 118
sion. Navy representatives saw Combat
Corps produced for the Office of the Under Report, and requested the Signal Corps to
Secretary of War, was intended as an aid change the title to read "Produced by the
to stimulate war production. In February Signal Corps for the Army and Navy."
1942 the Labor Consultant to the Under This was done, and thereafter each film in
Secretary of War had suggested that a film the series contained at least a few shots of
be prepared which would dramatize the the Navy in action.119
Army's desperate need for equipment and
the responsibilities which the war placed The Training Film Program
upon "our soldiers of production." Capt.
Richard W. Maibaum of the Army Pic- The biggest of all the wartime photo-
torial Service prepared the script and served graphic chores centered around the training
as technical adviser to 20th Century-Fox film program. In the broad sense, almost
during its production. Before the end of every sort of film, except those designed
June this picture, The Arm Behind the purely for entertainment, could be consid-
Army, had had more than 700 showings to ered to be a training film. A narrower con-
an estimated one million workers assembled cept limited the definition to a film that
in factories, union halls, and at plant and presented a portion of the established cur-
community rallies. It had won general com- riculum of a service school. In that sense,
mendation from workers and management providing training films for the various arms
officials alike. Under Secretary of War Pat- and services had been an accepted part of
terson was deeply impressed by it. He con- the Signal Corps' duties for many years.
sidered it a "highly successful dramatization Even before Pearl Harbor the demand for
of the Army's production message," and training films was paralleling the growth
requested General Somervell to direct the of the armed forces. After war came the
Signal Corps to produce one such film every rate of demand rose faster than the rate of
month.117 growth of the Army, because mass training
To comply with the directive, a special of large numbers of men could be accom-
subsection was set up within the Army Pic- plished most effectively through the medium
torial Service, eventually becoming the Spe- of films. For fiscal year 1942 the sum of
cial Projects Branch. Three more films were $4,928,810 was appropriated for Army
produced before the end of the year: Com- Pictorial Service, of which $1,784,894 was
bat Report, made by Pathe, and Firepower for motion picture production and $1,304,-
and Attack Signal, both by 20th Century- 710 for motion picture distribution, chiefly
Fox. The Signal Corps Photographic Cen-
of training films. More than four times that
ter dubbed in Spanish and Portuguese titles
sum, $20,382,210, was appropriated for
for South Central American audiences, and
the Office of War Information distributed the next fiscal year, 1943, and half went for
training films and for training of officer and
117
(1) Memo, Patterson for Somervell, 7 May
118
42, sub: Motion picture rqmts of USW. APS APS Summary Rpt, pp. 307ff.
119
Summary Rpt, pp. 306-307. (2) CSigO, Annual Clarke, Signal Corps Army Pictorial Service,
Report, 1942, p. 336. p. 212.
PHOTO BY U.S. ARMY SIGNAL CORPS 419
enlisted personnel in photographic special- To the extent possible with the facilities
120
ist courses. available, the Signal Corps had always pro-
The actual production of a training film duced training films in its own film labora-
was always the result of a request from some tories, but until the middle of 1942, when
arm or service. Throughout 1942 the de- the SCPC became operative, the facilities
tails incidental to approval of film projects had simply not been adequate to cope with
varied as organizations and command chan-
the volume of requests. Thereafter SCPC
nels changed, but the essential elements of
produced a progressively larger and larger
procedure remained the same. The arm or
service decided what part of its school cur- percentage of films. The demand, however,
riculum should be presented on film, and continued to outrun the ability of the lab-
prepared a picture plan, a general outline oratory to produce the films, and the Signal
of the material to be presented. This plan, Corps continued to place contracts for com-
when approved by the chief of the appro- mercial production of such films with the
priate service (by way of the service train- west coast film industry. Until December
ing division) was the basis for the scenario, 1942 the contracting agency with which the
prepared either by the Signal Corps (for Signal Corps dealt was the Research Coun-
SOS) or by the service itself (for the AGF). cil of the Academy of Motion Picture Arts
The Army Pictorial Service within the Of- and Sciences.
fice of the Chief Signal Officer determined It was this aspect of the Signal Corps'
whether the picture would be produced at contractual relationships which received the
the Signal Corps Photographic Center or most attention in a series of investigations
by the west coast film industry. Technical during the latter half of 1942. They cul-
advisers assigned by the requesting arm or minated in hearings before a special com-
service assisted in the actual production in mittee of the United States Senate which
either case. When the finished film was ap- was investigating the entire national defense
proved and accepted by the requesting serv- program. In August 1942 this committee,
ice, the Signal Corps distributed it as in- headed by Senator Harry S. Truman, pre-
structed by the service.121 sented the War Department with a list of
questions pertaining to the Signal Corps'
120
CSigO, Annual Report, 1943, p. 496. training film program. Rumors had reached
121
(1) APS Summary Rpt, pp. 298-300, 335-36.
(2) Jacqueline M. Quadow, Training Films in the the committee that the Research Council
Second World War (1944), SigC historical mono- was assuming a dominant role in the train-
graph F-l, pp. 48-56. SigC Hist Sec File. (3) At-
tachment 4, Interim Report on Training Films,
ing film program to the exclusion of small
Control Div, SOS, 2 Oct 42, to Memo, Maj Thos. producers who were not members of the
D. Hodge, Control Div OCSigO, for Deputy CSigO, council; that the operation of the Affiliated
3 Feb 43, sub: Control Div SOS, tng film investi-
gation rpts (Interim, 2 Oct 42), and Hollywood Plan put Hollywood's favorite sons into safe
inspec (30 Oct 42). Hereafter cited as Hodge berths at Astoria for the duration of the
Memo. SigC EC 062.2 Tng Films 1940-4-42. (4)
ASF Manual M4, Military Training (April 1945), war; and that Colonel Zanuck, by virtue
pp. 31-34. DRB AGO. Training films for the of his three positions as chairman of the
AAF, a Signal Corps responsibility until late 1942, Research Council, as an official of 20th
were handled in much the same manner, the TFPL
at Wright Field being the producing agency. Century-Fox, and as a Signal Corps officer
420 THE SIGNAL CORPS
on active duty, was exerting undue in- cumbersome procedures, disputes between
122
fluence. those responsible for training film doctrine
The questionnaire, recognized as the har- and those responsible for production, lack
binger of a Congressional investigation, of definite assignment of duties among Army
touched off a series of independent investi- elements participating in the program, and
gations of the photographic program by the the lack of production scheduling. It
Services of Supply. The first was conducted charged that "contractual arrangements
by Lt. Col. A. M. Sims of the Control Di- with Hollywood" had made the Army "pe-
vision, SOS, in and about Washington dur- culiarly impotent" in obtaining the kinds
ing August and September. It culminated in of films required, and that proper controls
a seventeen-page Interim Report on 2 Oc- over the expenditure of federal funds had
123
tober. The report charged that production been lacking.
of urgently needed training films had been The report listed ten recommendations,
"exasperatingly slow"; it protested against six of them directed toward the Signal
Corps. Most of these actually related to staff
122
(1) Memo, Col Lawton for CSigO, 27 Aug supervision and co-ordination of training
42, sub: Photo activities. SigC 062.2 Photo Activi- film activities, which were not the responsi-
ties. OD-27. (2) Intervs, SigC Hist Sec with Law-
123
ton, 5, 8, 9 Mar 48. SigC Hist Sec File. Hodge Memo.
PHOTO BY U.S. ARMY SIGNAL CORPS 421
bility of the Signal Corps, but of the Train- for the SOS. AGF also pointed out that the
ing Division, SOS, as the Director of regulations covering the production of train-
Training, General Huebner, and the Dep- ing films were inadequate and obsolete and
uty Director, Colonel Weible, quickly urged the revision of AR 105-260.126
pointed out.124 Weible said, "The writer was Following the submission of the Interim
apparently not entirely conversant with the Report, Colonel Sims, accompanied by
responsibilities or authority of an operating three officers from his division, and by Lt.
agency as contrasted with a staff unit. This Col. Charles T. Lanham, chief of the Visual
has resulted in unfair criticism of the Signal Aid Section, AGF, and Col. Kirke B. Law-
Corps." Huebner also remarked that most ton, chief of the Army Pictorial Service,
of the criticisms submitted had been appre- departed for Hollywood to investigate train-
ciated prior to receipt of the report, and ing film activities in that area. On 30 Oc-
that steps had already been taken to remedy tober the Sims investigators submitted their
them. One of the steps involved a directive final report to General Somervell who im-
to all the preparing arms and services to mediately sent a copy of it to The Inspector
submit a complete list of all approved proj- General for further investigation. At the
ects and a list of projects for which approval same time he directed the Chief Signal
would be requested during the fiscal year Officer to comply with the dozen recom-
1942-43. This would permit the Signal mendations embodied in the final report,
Corps to be given a production schedule, aimed at Signal Corps relations and operat-
with priorities set up, on which an orderly ing procedures with the Research Council.127
125
production program could be based. General Olmstead at once began reor-
The Army Ground Forces, commenting ganizing APS procedures to comply with
on the Interim Report, not only reflected the pertinent recommendations. The effect
the opinion that the report had been written was to decentralize operations and to give
under a misconception of responsibilities the Signal Corps Photographic Center at
amid a confusion of terms, but also noted Astoria a good deal more authority. He gave
that many of the statistics it contained were the SCPC responsibility for scheduling and
erroneous, and the allegations incomplete producing all training films whether pro-
and misleading. For example, although the duced there or in Hollywood. He converted
report alleged that only three training films the Liaison Office in Hollywood into an op-
had been completed and distributed for the erating office, as the Western Branch of the
Army Ground Forces and the Services of SCPC, in quarters separate from those of
Supply between 1 January and 15 Septem- the Research Council. He also directed the
ber 1942, AGF asserted that actually sev- SCPC to prepare a production plan for
enty-five had been released for the Ground 128
Attachment 8, 1st Ind, Hq AGF to CG SOS,
Forces alone, and probably as many more 5 Nov 42 (without basic ltr) ; Attachment 13, 1st
Ind, Hq AGF to CG SOS, 9 Nov 42 (without
124
Attachment 6, Memo, Weible for Control Div basic ltr), to Hodge Memo.
127
SOS, 29 Oct 42, sub: Comments on rpt on tng films Attachment 9, Inspection of Training Film
made by Control Div SOS, 2 Oct 42, and Attach- Operations in Hollywood, California; Attachment
ment 7, Memo, Dir of Tng SOS, 29 Oct 42, sub:10, Memo Gen Styer, CofS SOS, for Dir of Tng
Tng aid program in SOS, to Hodge Memo. SOS, 30 Oct 42, sub: Tng films; Attachment 14,
125
Attachment 7, Memo, Dir of Tng SOS, 29 Memo, CG SOS for CSigO, 1 Nov 42, sub: Tng
Oct 42, to Hodge Memo. films, to Hodge Memo.
422 THE SIGNAL CORPS
training films, in the form of a report to the Somervell's absence overseas, and moved his
Commanding General, SOS, establishing chief of staff, Brig. Gen. Wilhelm D. Styer,
the relationships of the Signal Corps with to recommend to him upon his return that
motion picture companies, writers, produc- a change be made in the supervision of the
ers, and directors, and to prepare standards Army Pictorial Service. Specifically, he rec-
128
by which to examine budget estimates. ommended that steps be taken "to effect
The second significant feature of Olm- any reorganization" of this "large and im-
stead's reorganization involved the breaking portant activity . . . very much in the
off of the long-standing arrangements be- spotlight." He suggested that "some very
tween the Signal Corps and the Research capable officer" be selected to supervise the
Council. The Research Council was per- organization, and noted that Brig. Gen.
mitted to finish the work it had in progress, William H. Harrison could be made avail-
but all new production projects would be able for the post.130
handled by the Western Branch of SCPC on A few days later General Somervell re-
a contract basis worked out with the in- ceived a preliminary report of The Inspector
dividual studios. Production costs were to be General's investigation and sent it to the
figured exactly—that is, as exactly as they Chief of Staff, U. S. Army, with his rec-
could be, considering the unknown contin- ommendations for reorganizing photo-
gencies that could arise in producing a film. graphic activities. The Inspector General's
The possibility that some of the producers report, like those of the Control Division,
might not continue the practice of making disclosed overlapping and a lack of co-ordi-
films on the basis of "out-of-pocket" costs, nation in the motion picture activities of the
as they had been doing, induced General Army as a whole. It listed eleven agencies
Olmstead to retain the Research Council in engaged in producing motion pictures, all
an advisory capacity in dealing with the competing for scarce materials and skilled
companies it represented, although it would manpower. Actually, this number was in
no longer handle War Department funds.129 error, since three of the organizations listed
The ink was barely dry on the directives were AAF units, responsible for their own
establishing the new procedures when fur- training film production under War Depart-
ther administrative changes erupted. Early ment order, and of the remaining eight,
in 1943, before the Inspector General's De- only two were engaged in activities which
partment had completed its investigation duplicated or overlapped those of the
of the Army's photographic program, the APS.131
Truman Committee followed up its ques- The report recommended that a central
tionnaire of the preceding August by begin- and unified photographic organization—
ning hearings at Washington on the activi- such as the Chief Signal Officer had pressed
ties of the Army Pictorial Service. The early for—be set up, but that it be separate from
questioning took place during General
130
Memo, Styer for Somervell, 26 Feb 43. ASF
128
Attachment 29, Ltr, CSigO to O/C SCPC, 9 CofS File, Feb 43.
131
Nov 42, sub: Prod of tng films, to Hodge Memo. Attachment 1, Analysis of Report of Inspector
129
Attachment 30, 1st Ind, Lawton to CG SOS, General, 5 March 1943, to Memo, Harrison for
18 Nov 42, sub: Tng film prod; Attachment 31, Lawton, 29 Apr 43, sub: Photo investigating rpts.
Memo, Lawton for CG SOS, 18 Nov 42, sub: Prod SigC EC 062.2 Tng Film—Analysis of Rpt of IG—
of tng films, to Hodge Memo. Tng film prod.
PHOTO BY U.S. ARMY SIGNAL CORPS 423
the Signal Corps. Noting that the Signal Within a few days the G-4 Section of the
Corps had already revised its procedures for General Staff offered a substitute plan. It
the commercial production of films, the re- provided for a board under the chairman-
port recommended that these new pro- ship of the Assistant Chief of Staff, G-4,
cedures be continued. It was full of criti- and recommended that no further action
cisms of past performances by the Signal be taken toward reorganizing the Army Pic-
Corps, other elements of the Army, the torial Service pending the completion of
Navy, and civilian government agencies, The Inspector General's investigation. Gen-
but since most of these had already been eral Somervell took issue with the G-4 pro-
corrected by the agencies concerned, the posal to defer the reorganization he had
report probably merited the term "anti-cli- recommended. "It is sheer sophistry to state
mactic," which the Acting Chief Signal Of- that facts are not known and are contro-
ficer, General Colton, applied to it.132 versial. The subject matter is under investi-
General Somervell's recommendations to gation by the Truman Committee, and it
the Chief of Staff for reorganizing the Army is highly desirable that the War Depart-
Pictorial Service followed those of The In- ment not be kicked into taking some
spector General's report. Although they em- action." 134 The upshot of the matter was
bodied the Chief Signal Officer's own ideas that, although he was denied authority to
for centralizing control of Army photog- reorganize the whole program, on 13 March
raphy in one agency, Somervell proposed Somervell named General Harrison to take
to withdraw control of the activity and charge of the APS, under Somervell's direct
lodge it in his own office, under an officer supervision. Two days later the Secretary of
of his own choosing. At the same time he War issued an order setting up the Army
proposed to leave the Chief Signal Officer Pictorial Board recommended by G-4 to
with the responsibility for the details of ad- integrate photographic policies and activi-
ties generally,135
ministration. Somervell's recommendations
Within a month the Truman Committee
also provided for the organization of an
resumed its inquiry into Army photographic
Army Pictorial Board, to be composed of
affairs. It heard Under Secretary of War
the chief of APS, as chairman, and repre- Patterson, General Harrison, Colonel Law-
sentatives of the AAF, AGF, SOS, Bureau ton, and a number of other officers. No new
of Public Relations, and Special Services evidence was brought out, although much
Division. Its function would be to establish of the questioning concerned past relations
photographic policies for the Army and to with the Research Council. Testimony con-
co-ordinate programs.133 firmed the practical impossibility of compar-
ing costs of training films produced commer-
132
Incl 3, Inspector General's Report, 5 March cially with the cost of those produced at
1943, and Exhibit 9, 3d Ind, Actg CSigO to CG
ASF, 29 Mar 43, to Memo, Col Lawton, Deputy Astoria, where topflight directors and other
Chief of APS, for Chief of APS, 19 Apr 43, sub:
134
Recommendations and actions—photo investigating (1) Memo, Styer for Somervell, 6 Mar 43;
rpts. SigC EC 062.2 Tng Films, 1942-43. (2) Memo, Somervell for Deputy CofS U. S. Army,
133
(1) Memo, Somervell for CofS U. S. Army, 8 Mar 43. ASF CofS File, APS.
135
1 Mar 43; (2) Memo, CSigO for CG SOS, 1 Mar (1) Memo, Styer for Deputy CofS and others,
43, sub: Photo activities of Army. ASF CofS File, 13 Mar 43. ASF CofS File, APS. (2) AG Memo
APS. W210-4-43, 15 Mar 43.
424 THE SIGNAL CORPS
specialists who received enormous salaries in the combat areas could not have been
in civil life had been acquired through the performed by a civilian.137
draft. Comparative costs were discussed, but The hearings came to a close. No formal
the figures had little meaning. At no time, report of findings was made, and on the
however, did the committee or the men it whole the committee seemed satisfied that
heard intimate that Hollywood had pro- the matter might well be dropped. As to the
duced inferior films or that it had over- Zanuck affair, a spokesman for the commit-
charged for its services. To the contrary, tee told the Deputy Chief Signal Officer
suspicion seemed rooted in the fact that the that the committee members were com-
Research Council had not charged as much pletely satisfied, did not care to interview
138
as it might have. Colonel Zanuck, and were "sorry that they
Many of the committee's questions cen- had bothered the Signal Corps in the first
138
tered around Colonel Zanuck and his status place." Chief of Staff Marshall person-
and duties as an officer. The matter had also ally wrote the Truman Committee, giving
figured prominently in The Inspector Gen- Colonel Zanuck "a fine boost" and express-
eral's report, which had devoted one entire ing himself as believing that Zanuck had
139
section to the Zanuck matter. Essentially, received unjust treatment. On 1 June
the criticism was based upon the fact that 1943 the War Department approved Zan-
from the time Colonel Zanuck was called to uck's request for relief from active duty.
active duty in early 1942 until August 1942, Early in July General Somervell relin-
he had continued to hold his position as quished his direct control of the Army Pic-
chairman of the Research Council and his torial Service and it reverted to its original
corporate connection with 20th Century- status as a part of the Office of the Chief
Fox Film Corporation, although he had Signal Officer, with Colonel Lawton again
drawn no salary as an Army officer and al- in charge.140 There had been no understand-
though his status had been known and ap- ing that the transfer out of Signal Corps was
proved by the Chief Signal Officer. There temporary, but it can be inferred that Som-
was no suggestion that Colonel Zanuck had ervell had made the arrangement for at least
in any way influenced the selection of mili-
two reasons. For one thing, he may have
been convinced that the move would fore-
tary personnel, or the business relations of
stall further criticism from government in-
the companies doing business with the Sig-
vestigating committees. Furthermore, Sec-
nal Corps, by virtue of his position with the
retary Patterson testified before the Truman
Research Council. On the contrary, as Sec- Committee that the organizational level
retary Patterson testified, there had been which the Signal Corps occupied did not give
wide agreement that Zanuck's expert serv- it the necessary authority to deal decisively
ices had been of immense value to the War with other services on the same or higher
Department, both before and after Pearl echelons.141 In the case of day-to-day opera-
Harbor. The chairman of the committee 137
Ibid., pp. 7042-45.
suggested that he might well have performed 138
Log entry, 24 Mar 43, p. 88. Deputy CSigO
the same services as a civilian, but Secretary Folder, 1942-45. SigC Hist Sec File.
Patterson pointed out that Zanuck's duties 139
Ibid., 26 Apr 43, p. 89.
140
ASF Memo S-37, 30 Jun 43.
130 141
Truman Committee Rpt, pp. 6895ff. Truman Committee Rpt, p. 7049.
PHOTO BY U.S. ARMY SIGNAL CORPS 425
tions, this argument would seem to have 1942 and early 1943 neither wrecked the
little weight, but when fundamental policy Army Pictorial Service nor altered its basic
decisions involving other services were at design very drastically. Nevertheless, it
stake it assumed validity. It was particuarly served to focus attention upon weaknesses
pertinent because General Olmstead was out and deficiencies which in the year that fol-
of the country during most of the period, on lowed were corrected to bring the Army's
an overseas inspection trip involving impor- photographic service to a high peak of ef-
tant supply matters. In other words, this ficiency. The strong, centralized control of
was a situation where "big brother" could Army photography was still lacking, but
command attention more effectively. APS officers were beginning to achieve the
During the three months General Har- desired results by closer co-operative rela-
rison as chief was responsible only to Gen- tions between initiating and producing
eral Somervell, Harrison applied himself agencies. Several of the measures taken in
intensively to the problems of APS. Report- 1942 were definitely helpful to the Signal
ing to the new Chief Signal Officer on 2 Corps—for example, the SOS directives of
July, Harrison outlined what he had ac- October and December which required all
complished. "Internal administration of the services to prepare lists of their film proj-
Army Pictorial Service and responsibilities ects, with priorities desired, and estimates
of the individual groups have been spelled of the time each would require, so that the
out," he said. He mentioned also the re- Signal Corps could establish reasonably ac-
vision of distribution and library service curate production schedules. The same di-
which had taken place under his direction, rectives forbade all services except the Sig-
the beginning of a program for improve- nal Corps to enter upon negotiations with
ment of overseas operations, the setting any commercial motion picture producer.143
up of a long-range program for improve- Decentralization of production scheduling
ment of V-mail operations, a review of the from the APS headquarters within the Of-
status of items of equipment and supply fice of the Chief Signal Officer to the SCPC
and steps taken to expedite procurement, at Astoria was a step toward better control
and a review of training films scheduled by of production. The SCPC soon established
AGF and ASF to determine their essen- a series of status reports and a system of
tiality.142 Harrison concluded by saying that rigidly controlled fiscal and accounting poli-
he believed APS was "now on a going cies which also served to regulate training
basis," that the staff was capable, and, in film activities. Several of the reforms ac-
effect, that all that was required was to complished during General Harrison's ten-
continue the present policies. ure, especially the consolidation and
standardization of distribution and use pro-
Summary: The Status of APS at cedures, were definitely beneficial.
Mid-Year 1943
143
Memo, Huebner for Chiefs of SOS, 24 Oct
The administrative upheaval that fol- 42, sub: Tng film program, and Memo, Huebner
for all Chiefs of SOS, 24 Dec 42, sub: Tng film
lowed the various investigations of late program of Army. ASF CofS File, APS. The cor-
responding directive from AGF to all its prepar-
142
Memo, Harrison for Ingles, 2 Jul 43, sub: ing agencies was issued 6 November 1942. Quadow,
APS. SigCDS (Harrison) APS. Training Films in the Second World War, p. 56.
426 THE SIGNAL CORPS
Most of the difficulties that beset the out. During the fiscal year 1943, approxi-
Army's training film program in the first mately 135,000 16-mm. prints and 24,000
eighteen months of war were the result of 35-mm. prints of training films were made
two factors common to many other Army available to film libraries in the United
activities. First of all, the demand was too States and overseas. There were 200,000
big and came too suddenly to be absorbed bookings of forty-four subjects filmed for
without some mistakes and frictions. In the the Corps of Engineers alone. Some 655,600
second place, both the using and producing still picture prints were distributed for tech-
146
agencies lacked experience. Men from the nical and publicity use.
commercial field were new to Army doctrine The APS had grown from 154 officers,
and procedures and to the use of films as 531 enlisted men, and 667 civilians, at the
training aids. Instructors and educator- end of June 1942, to 414 officers, 909 en-
advisers knew the effectiveness of visual aids listed men, and 1,661 civilian employees
but did not know the techniques needed to by the end of June 1943. Appropriations
create effectiveness. Old line Regular Army for the photographic service had increased
officers knew what they wanted their men during the same period from less than five
to do and to learn but did not know the million dollars to more than twenty million
limitations and the possibilities of films as dollars. V-mail costs alone now amounted
training aids.144 By mid-1943 requesting to almost four million dollars, and within
agencies had learned from experience a the year 273 enlisted men and 33 officers
great deal about the intricacies of training had received training in the operation of sta-
films and the Signal Corps' problems in pro- tions at the Official Photo Mail Station at
147
ducing them and were co-operating at every Washington. During the calendar year
step, to the mutual benefit of all concerned. 1942 the School at the SCPC graduated
The period of greatest productivity in 525 men, and, in 1943, 101 officers and
the Army Pictorial Service still lay ahead, 652 enlisted men. The Army Pictorial Serv-
particularly in the field of combat photog- ice was well on its way toward the fine rec-
raphy.145 Nevertheless, already a substan- ord of accomplishment with which it was
tial record of achievement could be pointed widely credited at the end of the war.148
144 146
Quadow, Training Films in the Second World CSigO, Annual Report, 1943, pp. 474, 478.
147
War, pp. 40-42. Ibid., pp. 478, 480-82, 485-86.
145 148
For experiences of Signal Corps photographers For an account of APS activities in the latter
in overseas campaigns of 1943-45, refer to Thomp- half of 1943, and in 1944-45, see Thompson and
son and Harris, The Signal Corps: The Outcome. Harris, The Signal Corps: The Outcome.
CHAPTER XIV
Global Communications
Late 1942-Mid-1943)
The Design for ACAN him a commander." With this General of
the Army Omar N. Bradley agreed.1
During World War II American and Al- From Washington, the heart of the
lied command became as wide as the world Army Command and Administrative Net-
and required signals on a global scale. work (ACAN), direct wire and radio cir-
Global communication suggests messages cuits enabled the Army's command head-
circling the world, clicking neatly through quarters to communicate quickly and, if
automatic apparatus in well-organized and need be, secretly, with all the major field
commands, whether continental or overseas.
well-equipped signal centers, replies to in-
Through the terminals of the primary com-
quiries returning in an unbelievably short
mand circuits it was possible to relay mes-
space of time. It is that. But military com- sages to subordinate administrative net-
munication during World War II involved works, to connecting tactical networks, and
much more than that. Its modes varied from to the Army Airways Communications Sys-
manual telegraph to automatic teletype. Its tem, which constituted an independent net
safeguarding required the utmost in codes, serving solely the needs of the Army's air-
ciphers, and cipher machines. Its nets serv- ways. After Signal Corps men established
ing the Army's administrative and tactical Army communications in an area, they
communications fanned out from Washing- strove to maintain the link back to Wash-
ton in all directions to reach to the Army ington, no matter how far the troops pene-
unit farthest out, sometimes a unit no larger trated or how many headquarters inter-
than a single soldier dropped in a remote vened.
spot to observe and to report. The very Such was the basic intent underlying the
smoothness with which the vast system orderly design of the Army's communica-
worked tended to divert attention from it tions system. Essential elements of the design
and from its vital purpose, except among were dependability, flexibility, security, and
the Signal Corps men who planned, engi- speed. It was flexibility that permitted the
neered, installed, and operated it. They small peacetime system to expand to war size
could say, and did, with justifiable satisfac- without change in the basic pattern.
tion, that "although Congress can make a 1
Omar N. Bradley, A Soldier's Story (New York:
general, it takes communications to make Henry Holt and Company, 1951), p. 474.
SIGNAL COMMUNICATIONS FROM FORWARD TO REAR AREAS pro-
vided the link necessary to successful command.
GLOBAL COMMUNICATIONS 429
Throughout the war the hub of the pattern pany, Press Wireless, Globe Wireless, and
turned on the War Department Signal so on. For example, the Signal Corps had
Center (designated as the Message Center leased the entire communication system of
prior to mid-1942) in Washington. Its radio Globe Wireless in order to supplement its
station bore the appropriate letters WAR. own installations within the United States
Thence the command network of radio and and in Hawaii. It had leased, effective 1
wire circuits radiated out like the spokes of a August 1942, Mackay and RCA stations
wheel to all the main headquarters of the near Chicago, New Orleans, Seattle, and
field forces in the United States and over- Los Angeles.
seas, to which new circuits were added as What commercial facilities the Signal
need arose. Then, from the outer terminals Corps did not put to use or lease for out-
of the spokes, which in turn became the right Army operation it included in plans
hubs, each of a separate wheel, other cir- for use in an emergency, in order to provide
cuits in like fashion fanned out to field head- secondary circuits upon which the Army
quarters and supply areas, to tactical units could fall back in the event that existing
right up to the front lines, even to Army nets suffered damage. Thus the Signal
transports plying the seas. Nor was ACAN Corps had arranged early in the war to op-
limited to Army facilities. It had connec- erate the facilities of RCA and Mackay in
tions with the Navy's circuits and with the order to provide emergency communica-
civil systems of Allied and neutral lands. tions between WAR and the more impor-
And of course it utilized large portions of the tant corps area headquarters. This was ac-
private communication systems at home. complished by means of control circuits
Truly a gigantic communications network which linked the War Department Signal
served the United States Army in World Center and Governors Island with the sta-
War II, its administrative and technical tions of those companies in New York.
operation directed by the Signal Corps from Early in October 1942 the Signal Corps
Washington.2 had drawn up a plan to consolidate both
The great civilian communications sys- military and commercial facilities in the
tems of America, severely taxed though they San Francisco area. The plan provided for
were with the transmitting of war-related
normal, and for first- and second-alternate
civilian communications, solidly buttressed
operation. A similar plan was implemented
the Army's administrative signals. ACAN
supplemented its own radio and wire de- in the Washington area.3 Yet, valuable
sign wherever possible with facilities leased though these civil facilities proved in war-
from the Bell System, RCA Communica- time, they could not provide one of the es-
tions, Inc., Postal Telegraph and Cable sentials of the ACAN design, namely, that
Company, Mackay Radio and Telegraph 3
(1) Pauline M. Oakes, The Army Command and
Company, Western Union Telegraph Com- Administrative Communications Systems, Pt. II,
Signal Corps Domestic Communications Network as
2
(1) Mary E. Boswell, The 17th Signal Service Extended to Overseas Terminals FY 1941-15 August
Company, A Component of the War Department 1945 (1945), SigC historical monograph E-5b, pp.
Signal Center from World War I through World 5-6. SigC Hist Sec File. (2) Memo, Col Hatch for
War II (1945), SigC historical monograph E-5a, Exec Control Div, 8 Oct 42, sub: Weekly digest
passim. SigC Hist Sec File. (2) CSigO, Annual Re- of prog and problems. SigC AC 319.1 Digest, 30
port, 1943, pp. 408ff. Jul 42-1 Dec 44.
430 THE SIGNAL CORPS
degree of security and secrecy which must Security, like flexibility, always remained
safeguard military messages. an important element in the ACAN design.
Security was the reef which eventually Wire therefore remained preferable to radio
wrecked one leased experiment, an inno- and, thanks to the large existing commercial
vation called the Army Full Period Tele- wire nets within the country, ACAN traffic
phone Network. This was a top command at home moved increasingly over wire cir-
domestic net intended to serve the highest cuits, as its radio channels within the states
Army commanders at Washington and else- were gradually closed down in order to
where throughout the country when ur- cheat the enemy of opportunities to eaves-
5
gency demanded overriding priority of com- drop.
munication. Early in 1942 the sudden need But radio remained essential to link WAR
for military telephone service had so over- directly with overseas terminals. By the be-
taxed commercial long-distance trunk lines, ginning of 1943 the circuit to Fort Shafter
including the long- and short-haul circuits in Hawaii was converted to landline
which the Signal Corps had leased, that operation as far as San Francisco and to
delays of hours in getting a telephone call radiotype from that point. Army communi-
through sometimes occurred. In February cation links eastward were building up
1942 the Signal Corps had begun organiz- heavily. Several efficient radio channels to
ing the Army Full Period Network. By 1943 London had come into operation. The War
the system sprawled along some 32,000 Department Signal Center utilized two
circuit miles and interlaced staff offices in commercial transatlantic cable circuits to
Washington with military commands the the British Isles as well. Radio channels
country over, with connections to Montreal now reached from WAR directly to Al-
and to points in Alaska. Heavily used and giers, to Cairo, to Casablanca, to Accra on
somewhat abused for the year and a half the Gold Coast of Africa, and to Asmara,
that it existed, Army's Full Period Tele-
phone Network helped greatly to alleviate a and 1st Ind, CSigO to CG AAF, 19 Dec 42. SigC
severe military telephone problem at home 676.1 Gen 7, Dec. 42.
Throughout 1942 home telephone facilities for
during the early months of the war. It got out the military expanded endlessly. During the one
of hand eventually through wide and undis- month of September there was a net gain of 95
criminating use by subordinate command- rented systems put into service, representing 7,206
stations and 1,033 lines. In addition to these rent-
ers. The voice scramblers employed in the als, 16 new systems were installed, adding another
net did not provide as much security as the 277 trunk lines. Memo, Col Parker for Dir of
Army Com Sv, 30 Sep 42, sub: Weekly digest of
users were prone to assume.4 prog and problems, 23-30 Sep, inclusive, Item
III, 3. SigC 319.1 Drawer 483, AC 133, Weekly
4
(1) Mary-louise Melia, Signal Corps Fixed Com- Digest of Prog and Problems, Rpts from Divs,
munications in World War II: Special Assignments 7-30-42 to 12-30-42.
5
and Techniques (1945), SigC historical monograph (1) Oakes, Army Command and Administra-
E-10, pp. 78-85. SigC Hist Sec File. (2) AG Ltr to tive Communications System, Pt. II, p. 32. During
CG's AGF, AAF, SOS, 1 Apr 42, sub: Army Full 1943 the landline teletypewriter network of the
Period Telephone Network. AG 676.1 (3-31-42) domestic ACAN system replaced the Army Ad-
MC-M. (3) Memo, CSigO for ACofS for Opns ministrative Radio Net at home. (2) Army Forces
SOS, 10 Nov 42, sub: Army Full Period Telephone Staff College Lecture C-1, Employment of Com-
Network. SigC 676.1 Gen 6, Oct-Nov 42. (4) Ltr, munications in the Army, Pt. I, Tab 9, p. 2. SigC
Col Marriner, Dir of Com AAF, to CSigO, 11 Dec OP 352 (11.02) Armed Forces Staff College Rpts,
42, sub: Request for private line to Orlando, Fla., 1948-49.
GLOBAL COMMUNICATIONS 431
well down the east coast, opposite southern and the Battery Cove receivers were relo-
Arabia. Not only did WAR personnel trans- cated there. The Battery Cove plant was
mit and receive, encode and decode, mili- then utilized as a second transmitter site
tary messages moving directly to and from complementing the Fort Myer installation.
such distant terminals, but the station Each was capable of independent operation
served also as the relay point for radio traf- and included transmitters ranging from 1
fic between other ACAN stations which did to 40 kilowatts in power. By 1943 an ultra-
not have direct connections. Relaying was high frequency radio system provided the
often necessary because the demands for di- control circuits between the Signal Center,
rect point-to-point circuits were always newly relocated in the Pentagon, and the re-
greater than the possibilities of providing mote transmitting and receiving stations.7
them. For example, messages between Mi- Networks whose spokes radiated over the
ami and the Caribbean area flashed first continents and spanned the seas were be-
into WAR and from WAR to the destina- coming commonplace. In the autumn of
tion : to Miami by way of a link from Wash- 1942 WAR added a novel spoke to the
ington to Atlanta, extended on to Miami wheel—a channel to Radio Station WTE.
through the facilities of the subordinate net- This was a terminal which moved hither
work; and to the Caribbean area by the and yon over the United States aboard the
direct channel between WAR and Panama President's private train. Signal Corps sol-
or between WAR and Puerto Rico, which diers from WAR had installed the equip-
had forked connections to Trinidad.6 ment in a railroad car. As President Roose-
Centering also at the War Department velt traveled across the country in the fall
Signal Center was a smaller local network of 1942, inspecting Army camps and instal-
made up of wire circuits which during 1942 lations the length and breadth of the land,
linked the Signal Center, located in the old for the first time in the nation's history a
Munitions Building in Washington, with
President could communicate almost in-
various tributary terminals, with the trans-
stantly with the White House through of-
mitting station at Fort Myer, Virginia, and
ficial communication channels. WTE had
with the receiving station at Battery Cove,
Virginia, several miles to the south. But access to WAR circuits at any time, whether
these transmitting and receiving locations in motion or at stops, through any one of
soon became inadequate for the expansion six War Department net stations with which
required to handle the growing volume of it maintained schedules. It had access to the
messages. A 450-acre reservation was ac- 7
The cutover of all radio channels from the Mu-
cordingly acquired at La Plata, Maryland, nitions Building to the new Pentagon location was
accomplished smoothly on 12 and 13 January 1943.
6
(1) Memos, Chief of ACD, for Control Div, 12- (1) OCSigO R&W Action 1, Maj T. H. Mitchell,
26 Nov and 3-31 Dec, sub: Weekly digest of prog Traffic Br OCSigO, to Chief of Traffic Br, 19 Jan
and problems, passim. SigC AC 319.1 Digest, 30 43. SigC AC 319.1 Prog Rpts Traffic Operational
Jul 42-1 Dec 44. (2) Ltr, CG AAF to CSigO, 19 Engineering, 5 Jan 43-9 Nov 43. The cutover to La
Dec 42. SigC 676.1 Gen 7, Dec 42. (3) 1st Ind, Plata was begun on 30 June and completed by 2
CSigO to CG Caribbean Defense Comd, 6 Mar July 1943. (2) CSigO, Annual Report, 1943, pp.
43, on Ltr, CG Caribbean Defense Comd to CSigO, 424-25. (3) Memo, Gen Stoner, Chief of Army
28 Jan 43, sub: Establishment of supply and water Com Sv, for Control Div, 17 Jul 43, sub: Digest of
transportation radio net in Caribbean area. SigC prog and problems. SigC AC 319.1 Digest, 30 Jul
AC 665.2 Army Adm Net. 42-1 Dec 44.
432 THE SIGNAL CORPS
White House by way of a private loop from east and the west, ultimately linking together
WAR and with Army commands anywhere completely around the world. Before the
in the world through the ACAN network end of 1942 some forty-six overseas radio
radiating from WAR. and cable links had come into use between
The White House station, in turn, served the Signal Center in Washington and the
as the hub of a unique Ultrahigh frequency primary terminals alone.9 As American sol-
network embracing, at first, five fixed and diers occupied lands where electrical com-
thirty-one mobile terminals. The fixed munication was mediocre at best, or non-
equipment was placed at strategically lo- existent, they nevertheless demanded good
cated points in the city of Washington. The communications service immediately be-
mobile sets were installed in automobiles cause they scarcely knew how to live without
used by the President, the Secret Service, the it. This the Signal Corps tried to provide,
Military Police, and the White House signal whether in the active theaters, or in quiet
detachment (under Col. William A. Beas- areas which soon might acquire greater
ley ). The Engineer Corps used one car in strategic importance, or in areas which the
this radio net. Subsequently the White war might bypass altogether. In 1942 the
House network added other fixed stations, path the conflagration would take had not
such as a terminal at Lee, Massachusetts, been well marked. Therefore, universally
the temporary home of Queen Wilhelmina good service was the only safe objective. But
of the Netherlands, to whom was extended there were many obstacles to achieving it,
the protection of the United States Secret such as the shortage of equipment, the ef-
Service. Still other terminals sprang up fects of latitude and ionospheric conditions
along the routes which the President trav- on radio operation, and the lack of skilled
eled frequently as he went back and forth manpower.
between the White House, his home at In peacetime the demand for fixed radio
Hyde Park, Warm Springs, and his station equipment had been fairly stable.
Shangri-la on Catoctin Mountain in Mary- Until the nation's manufacturing capacity
could be increased, it could not produce
land. At the main terminals of the White
enough big transmitters, power units, an-
House network, private (PBX) telephone
tenna equipment, and associated items to
networks supplemented the radio system. enable the Signal Corps to provide point-
Thus, the President was never out of touch to-point service throughout the world.
either with the White House or with WAR, While manufacturers tooled up quickly for
no matter how far afield he traveled.8 greater production, the Signal Corps used
ACAN installations were extending commercial standard equipment in its ex-
widely as they kept up with the spreading pansion. Although some of the items were
theaters of the war. Army's radio channels not entirely satisfactory, they served, with
and wire circuits rapidly increased to the modifications, to place vital circuits in op-
8
eration. Meanwhile, until commercial
(1) Oakes, Army Command and Administrative
Communications System, Pt. II, pp. 113-14. (2)
equipment could become available in quan-
Maj George J. McNally, "WTE Calling," Signals,
9
7:4 (March-April 1953), 20ff. (3) Signal Corps Draft of Memo, CSigO for AWS Comdrs, 2
Technical and Tactical Training Aid (January- Nov 42, sub: Responsibility in connection with
February 1953), p. 39. SigC Hist Sec File. fixed com systems. SigC 676.1 Gen 6, Oct-Nov 42.
GLOBAL COMMUNICATIONS 433
tity, the Signal Corps plugged the gap in communicating by radio over the polar re-
supply with three million dollars' worth of gions but also facilitated communication in
equipment obtained from amateur radio the event of failures or interference any-
operators. By the end of the war, the Signal where.11
Corps' administrative network, the world- Radio circuits were unpredictable at best.
wide fixed ACAN facilities, would build up The British in Libya had found that at times
to a value of 163 million dollars, three times units forty to sixty miles apart could not
the cost—an estimated 57 million dollars— communicate with each other by radio, re-
of the entire international plant of all gardless of the power output they used, yet
American commercial communication each could communicate with London.
companies.10 Therefore, while the condition lasted, traffic
An initial obstacle encountered in pro- between the nearby points had been relayed
viding satisfactory world-wide radio service through London facilities.12 Similarly, in the
was magnetic absorption in the polar re- continental United States, there were times
gions, which reduced the reliability of direct when an antenna built and beamed for
channels between WAR and some of communication with Chicago, for example,
the more strategic ACAN stations overseas. transmitted a stronger signal to San Fran-
There then was no known means of over- cisco. The operators confessed they did not
coming this effect. But the polar regions know why it was so, but they found by
could be bypassed. Therefore, the Signal experimenting that when signals were bad
Corps designed a belt line of communica- over authorized channels they could often
tions circuits which circled the world in the be bettered by an unorthodox hookup. The
vicinity of the equator. The eastward equa- improvement might last from minutes to
torial route from WAR sped by way of weeks and months.
Asmara in Eritrea, Africa, New Delhi in To correct situations of this sort was just
India, Brisbane in Australia (later Manila a part of the radio operator's job, and
was substituted when the Philippines were therein lay another of the obstacles to pro-
retaken), and San Francisco, thence back viding good communications service on the
to WAR by landline. Terminals at strategic fixed networks: the length of time required
points to the north and south tapped into to convert a recruit into an accurate, speedy,
the equatorial belt line with secondary cir- sensitive technician capable of coping with
cuits. Thus from any point served by Army such happenings. Training time could not
circuits, messages could be sent to any other be avoided or reduced. But might it not be
point around the world. If ionospheric con- possible to substitute automatic equipment?
ditions in one direction were bad, traffic Indeed, the Signal Corps had already be-
could readily be routed in the opposite direc- gun searching for a means of transmission
tion to reach its destination. This around- that would reduce the requirements for
the-world belt line was a happy solution skilled technicians. The use of Boehme
which not only evaded the difficulty of high-speed equipment was the first step, but
10 11
Maj Gen Frank E. Stoner, Chief of ACD Oakes, Army Command and Administrative
OCSigO, speech before the American SigC Asso- Communications System, Pt. II, pp. 116ff.
12
ciation, New York, 27 Feb 46. SigC Hist Sec Sig Intel Sv Memo, Communications and the
File. Staff, 1942. SigC Hist Sec File.
264-211 O - 78 - 29
434 THE SIGNAL CORPS
that was only partly an automatic process. lion words of message matter a month and
Radiotype, another experiment in "semi- its long-distance telephone conversations
automatic" equipment, proved to be not were consuming almost 1,500 hours
completely satisfactory. ACAN combined, monthly. Not all the communication ar-
discarded, and improvised until a rapid, rangements were efficient. For a while the
secure automatic system suitable for military chief of one service was paying, in effect,
use on the command network was achieved. $608 for each message which passed be-
This system, radioteletype, involving auto- tween his office at Washington and a field
matic teletype and tape relay, was incorpo- office in San Francisco, so light was the
rated in the ACAN design as quickly as traffic on his private line in comparison
possible, beginning in early 1943.13 with the rental cost of the circuit.14
In theory the Signal Corps was the sole Early in the war there was no central au-
provider of administrative military commu- thority in the Army to co-ordinate and con-
nications service. But the wide expansion of trol leased facilities. Eventually, more than
communications facilities, which the in- seventy-five communication installations
crease in the Army during the first year of were integrated into one network. But this
the war made necessary, was not accom- integration affected only a fraction of all
plished without duplication, overlapping, the domestic Army circuits. Not until late
and division of authority. Crisscrossing the in the summer of 1943 was action taken to
orderly design of the Signal Corps' ACAN centralize appropriately in the Signal Corps
by late 1942 were numerous independent the control of the many independent mili-
military networks. There were the Army tary communication systems, and then the
Air Forces Ferrying Command Network; War Department applied only a halfhearted
the Air Service Command Teletypewriter remedy, dividing responsibility between the
Network; the Army Air Forces Statistical Chief Signal Officer on the one hand and
Control Network; the Intelligence Net- corps area commanders on the other.15
work; the Second Air Force Tactical Net- This dual control was the best that could
work ; and the telephone and telegraph full be achieved. Also, by then there developed
period private line service (Army Full Pe- pressure for new communications networks,
riod Telephone Network) of the Eastern such as an antisubmarine network, and an
and Western Defense Commands, the First
administrative communications system to
and the Fourth Air Forces, and the Third
be used entirely by the Army Air Forces,
Army. Within the Signal Corps itself was
an independent system, the Storage and Is- aside from the Army Airways Communica-
sue Teletypewriter Network. In addition, 14
(1) Oakes, Army Command and Administra-
the Army was consuming a vast amount of tive Communications System, Pt. II, pp. 12-13. (2)
commercial circuit and channel time on a Interim Rpt compiled by Lt Col Fred A. Iron-
toll basis by telephone, telegraph, and sides, Jr., ASF, 23 Sep 43. SigC AC 676.1 Gen
1942-45. (3) Gen Stoner, ACSigO, speech before
TWX (Teletypewriter Exchange). The Of- the Federal Communications Bar Association,
fice of the Chief of Ordnance alone was re- Washington, 11 Jan 46. SigC Hist Sec File.
15
(1) WD Cir 222, 21 Sep 43. (2) Maj Gen
ceiving and dispatching almost ten mil- Harry C. Ingles, CSigO, address before conference
of CGs of Sv Comds, Jul 43. SigC Hist Sec File.
13
See above, pp. 218-24. See also Army Forces (3) Oakes, Army Command and Administrative
Staff College Lecture C-1, Pt. I, p. 3. Communications System, Pt. II, pp. 11, 13-14
GLOBAL COMMUNICATIONS 435
tions System, which everyone conceded to tary situations Stoner had no doubt that co-
be a necessary exception to the orderly com- ordination should be attained by com-
17
munications design. At places the AACS mand.
paralleled the ACAN; at others it diverged
as it followed the routes of the Air Trans- Organizing and Implementing ACAN
port Command. But the priority of the traf-
fic it carried was such as to preclude the ACAN took form out of the trials and
integration of its channels with those of the troubles of the early days of the war. Maj.
ACAN even where the circuits ran parallel. Gen. George V. Strong, Assistant Chief of
The AACS was in reality a tactical network Staff G-2, testifying in mid-1943 before a
which crossed many a jurisdictional bound- board of officers investigating Army sig-
ary. Where the routes converged and traf- nals, recalled: "In March, 1942, I was di-
fic was light, the trend was to integrate the rected by the Chief of Staff to look into the
administrative into the airways system Signal Corps and straighten out the matter
rather than the other way around. Often of Army Communications, where there was
Signal Corps men operated administrative a terrific backlog of messages." The Chief
channels in the AACS stations; sometimes of Staff and his staff officers, Strong noted,
they operated the AACS tactical circuits were encountering delays of hours and days
too, although officially that was the func- in getting messages to field commanders
tion of the AAF. Similar co-ordination ex- and in receiving answers. "I called down
isted between the Army and the Navy where General Stoner." he said, "who at that
circuits ran parallel or where joint facilities time was in charge of the War Department
existed. And paralleling circuits, in these Message Center, and gave him a very spe-
circumstances, did not usually mean dupli- cific mission. ... I told him what was re-
cation. If traffic volume warranted two cir- quired and I wanted his recommendations
cuits in the same area, as it frequently did, as to how that was to be accomplished. He
it appeared preferable in many respects for gave me a set of recommendations and on
each service to operate its own circuit. Even- those, we got out a plan for the develop-
tually considerable standardization was ment of Army Communications." 18
achieved between the systems of the Signal Thereafter, the Chief Signal Officer's re-
Corps, the Army Air Forces, and the sponsibility for providing communications
Navy.16 channels for the Army, including those for
Speaking in mid-1943 of the relation be- the expanding air routes, was lodged in the
tween the AACS and ACAN, General Army Communications Division, which in
Stoner, Chief of Signal Corps' Army Com-
July 1943 became the Army Communica-
munications Division, said "It is all on a co-
tions Service. Upon General Stoner, who
operative basis. Everything that has been
done has been done on a cooperative basis."
remained the efficient chief of the activity
But co-operation sometimes failed. In mili- throughout the war, the huge task devolved.
The division had but one purpose—to ex-
16
(1) Gen Stoner, Army Communications, semi-
17
nar of the Army Industrial College, Dept of Re- Proceedings of Board To Investigate Communi-
search, 24 Sep 45. SigC Hist Sec File. (2) Oakes, cations, Tab O, pp. 2-3. AG 311 (5-10-43) (1)
Army Command and Administrative Communica- Bulky Pkg Army RG 207.03, Job A50-55.
18
tions System, Pt. II, pp. 14-17. Ibid., Tab U, p. 1.
436 THE SIGNAL CORPS
tend the Army's wire and radio networks ample, Boehme high-speed telegraph equip-
to service all the elements of the Army, ment was removed from installations in the
wherever they might be, down to the point Fourth, Fifth, and Eighth Service Com-
where the tactical communications troops mands, not because those areas did not need
of the ground and air forces took over. From it, but because the needs of task forces were
that point on, communications became the greater. Yet it was difficult to retrench any-
responsibility of the field commanders where, in view of increased demands every-
under whom Signal Corps units served. where, unless the post commanders and
Signal Corps' Army Communications field signal officers co-operated. Securing
Division early in the winter of 1942-43 con- agreement in such instances became another
19
sisted of three units, each concerned with task for the new engineering unit.
one of the three main essentials of military The equipment situation was tight—
communications service: (1) the installa- tighter than officers overseas realized. Far
tion of the fixed wire and radio plants, (2) removed from the administrative problems
the movement of message traffic over the at home, they knew only how meager was
networks, and (3) the safeguarding of the their supply of even the bare essentials for
content of military communications trans- good communications, and they chafed at
mitted- by either military or commercial the delays in receiving what they desired.
means. These functions were the responsi- Colonel Grable, in the Southwest Pacific,
bilities, respectively, of the plant, the traffic, nettled by his unfilled requisitions, wrote to
and the security units, headed in that order Colonel Parker in Washington: "We have
by Colonel Parker, Colonel French, and no civilian corporations across the street
Col. Frank W. Bullock. that we can run to in case of emergency."
20
On 1 January 1943 the Office of the But all the manufacturers together could
Chief Engineer, Signal Corps, came into not immediately produce the vast quanti-
being to assist in determining policies and ties of equipment needed.
formulating plans to co-ordinate the opera-
tions of these units. The Chief Engineer, Plant
Col. William C. Henry, concerned himself
with plans for extending ACAN, for in- In 1943 as troops moved out to overseas
stalling and maintaining the AACS, for bases and theaters in ever greater numbers,
providing submarine cable facilities, for the Army Communications Division faced
manufacturing and supplying equipment tasks unprecedented in communications his-
for the overseas and the domestic stations of tory. For a while the War Department gave
the networks, and for constructing wire and thought to a plan for unifying the control of
pole lines in deserts, tropical jungles, and administrative and airways circuit in a
the frozen north where a permanent Army more powerful "Army Communications
telephone line was being built along the
19
route of the new Alcan Highway. Equip- (1) CSigO, Annual Report, 1943, pp. 409-10.
(2) Progress and Problems Report, Airways and
ment was scarce, so scarce that Colonel Fixed Radio Br Plant Div OCSigO, 16 Sep 42.
Henry had to dismantle some domestic sta- SigC 319.1 Digest of Prog and Problems 1, 1942.
20
Ltr, Grable, Hq USASOS SWPA, to Parker,
tions and rearrange facilities in order to 10 Dec 42. SigC AC 333.1 Inspec Trip to South
provide essential items overseas. For ex- and SWPA Area, Maj A. E. Wharton, 1942.
GLOBAL COMMUNICATIONS 437
21
Command." The plan was not adopted. some large and some small, often became
But a reorganization of Colonel Parker's hopelessly hidden in transportation snarls
22
Plant Branch did take place. The branch unless they received special handling. It
had encountered much woe in carrying out therefore fell to the lot of Plant Branch to
its mission of getting fixed-station equip- follow through on fixed-station supply and
ment to overseas destinations. The usual eventually on entire engineering projects,
supply agencies were swamped by the task from inception to completion.26 All this
of sending large quantities of T/BA signal meant expansion and reshaping of the Plant
equipment to troops and could not be ex- Branch.
pected to give special attention to assembling Another circumstance which compelled a
the conglomeration of material required for reorganization of the Plant Branch was its
fixed stations. In many areas even the com- responsibility, recently restated, to supply,
monest items of hardware were unobtain- install, and maintain point-to-point and air-
able, and shipments accordingly had to in- navigational communications equipment
clude everything that would be needed, for the vast chain of navigational and com-
down to the last bolt and nut. Moreover, munication stations which constituted the
field offices often requisitioned materials AACS, whose extent would soon exceed
which did not accord with the engineering ACAN itself. A special part of this special
plans, or which could not be used with the system for the Air Forces pertained to meteo-
power available, or which duplicated that rology. As air routes circled the earth,
being supplied by Plant. By instituting a weather stations from the icecap of Green-
careful review of such requests with land to the jungles of the tropics provided
an eye to conserving critical materials,23 the meteorological data required for safe
Plant had been able to reduce the items flying over the globe. All this particularized
on some requisitions from Australia, the Fiji work to be done for the Army Air Forces
Islands, and New Caledonia by as much as made it desirable to detach the plant organi-
75 percent.24 Further, special shipments, zation from the Office of the Chief Signal
21 Officer and move it to Philadelphia, where
Activities of the Dir of Planning, OCSigO, 11
Nov 42. SigC 319.1 OD-1 Daily Rpt. it was established by February 1943 as the
22
The plant organization changed names three Plant Engineering Agency (PEA), an
times in one year. During 1942, it was at first exempt installation—under the direct con-
called the Plant Division, then the Plant Branch,
and in February 1943 it became the Plant En- trol of the Chief Signal Officer and still
gineering Agency. At the end of June 1942 the supervised in its operations by General
staff numbered 40 officers and 160 civilians. A year Stoner.26
later these numbers increased to 160 and 540, re-
spectively. CSigO, Annual Report, 1943, pp. Philadelphia was selected for several
427-28.
23
reasons. There PEA would be near the big
(1) 7th Ind, CG ATC to CG AAF, 23 Oct
25
42; 8th Ind, CG AAF to CG ATC (without basic OCSigO R&W Action 1, Plant Br to ACD, 27
ltr). SigC 413.35 Teletalk 1, Oct 42. (2) Ltr, Oct 42. SigC 322.08 PEA 1.
26
Parker to Dir of ACD OCSigO, 20 Mar 43, sub: (1) See above, p. 287. (2) OCSigO Memo, 25
Com Engineering and Supply to Theaters of Opns, Nov 42; (3) Memo, CSigO for BO WD, 23 Dec 42,
and 1st Ind, CSigO to PEA, 30 Mar 43. SigC 676.1 sub: Establishment of PEA in Philadelphia. SigC
Gen 3, Mar 43. 300 Gen 1. (4) CSigO, Annual Report, 1943, p. 57.
24
Report of Progress and Problems, Plant Br, (5) Memo, Stoner for Control Div, 2 Feb 43, sub:
30 Dec 42. SigC 319.1 Digest of Prog and Prob- Digest of Prog and Problems. SigC AC 319.1 Digest,
lems 1, 1942. 30 Jul 42-1 Dec 44.
438 THE SIGNAL CORPS
Philadelphia Signal Depot and eastern man- aspiration which was never attained during
ufacturing sources. Better co-ordination World War IL29
toward filling requisitions might be ex- From its Philadelphia office the PEA op-
pected. Further, the Directorate of Com- erated through four field headquarters serv-
munications of the Army Air Forces had ing the four wings of the Air Transport
proposed to establish an office in Philadel- Command at Presque Isle (Maine), Miami,
phia and, for that reason especially, the city Seattle, and San Francisco.30 Procedures
had seemed the logical place for the head- were experimental and experience led to
quarters of the Signal Corps' AACS activ- changes. At first the radio engineering work
ity. Ironically, after the Signal Corps had for all installation projects was done at Phil-
committed its Plant Engineering Agency to adelphia. A request from the Air Forces in
Philadelphia, the AAF decided to transfer the field for a certain type of AACS instal-
its Air Transport Command headquarters lation went to the headquarters of the Air
with the attendant AACS to Asheville, Transport Command at Asheville for ap-
North Carolina.27 This example of poor co- proval. Then PEA received the approved
operation separated the PEA and its work- request with a directive to install the equip-
ing partner, the Technical Division of the ment. The engineers at Philadelphia usually
AACS, by some 600 miles. The transaction lacked knowledge of local conditions at the
of PEA-AACS business required the writing site, such as its altitude, its accessibility, its
of four to five hundred letters a day. position in relation to the power supply,
The Signal Corps wrote a strong com- mineral deposits in the ground which might
plaint, which General Somervell vigorously affect operation, and so on. Maps, if avail-
endorsed and sent on to General Arnold, able at all, were often inaccurate and incom-
asking that the Technical Division be moved plete. The best the engineers could do in
back to Philadelphia. "That shows you," their ivory towers at home was to produce
Stoner told a board of General Staff officers some sort of drawing, which did not always
who investigated Army communications in fit the far-off situation. The Army Commu-
the spring of 1943 that "without any con- nications Service, hoping to correct this de-
trol from the top . . . these three networks fect, soon redistributed PEA's engineering
[ACAN, AACS, and the Air Transport personnel to sector headquarters, and even
Command net] can just be operated any farther out, to the regions into which the
way they want." 28 He regretted that the co- sectors were subdivided. With closer co-
ordinated operation of the several almost operation accomplished in the field, guess-
independent networks in the Army had to work was reduced and delays were short-
depend upon voluntary co-operation. ened. Plant assembly points, to be estab-
"There is no command control [of Army 29
Ibid., Tab O, p. 3. For a discussion of the
communications] at the top," he lamented. problem of control over Army signals, see below,
General Stoner preferred a strong over-all Ch. XVI, passim.
30
(1) Memo, CSigO for CG SOS, 23 Nov 42,
control of Army signals, a Signal Corps sub: ACS, and 1st Ind, CG SOS to CSigO, 28
Nov 42; (2) Memo, CSigO for BOWD, 23 Dec 42,
27
OCSigO R&W Action 1, Parker to ACD, 30 sub: Establishment of PEA in Philadelphia. SigC
Dec 42. SigC 322.08 PEA 1. 300 Gen 1. (3) AG Ltr, 21 Apr 43. AG 320.2 (14
28
Proceedings of Board To Investigate Communi- Apr 43) OB-I-SPMOU-M. (4) AG Ltr, 15 Jun 43.
cations, Tab O, p. 4. AG 320.3 (12 Jun 43) OB-I-SPMOU-M.
GLOBAL COMMUNICATIONS 439
lished later in the various regions, were to sizable Signal Corps chore. Early in 1943 a
bring about a further improvement, al- Commercial Service Branch was established
though defects continued to abound. in the Army Communications Division, and
As PEA came to be engaged practically within two months this branch also became
full time in work for the Army Air Forces a field operating agency, the Army Com-
during 1943, the burden of Signal Corps munications Commercial Agency at New
planning toward its own ACAN remained York City.32
with the Washington organization, specifi- Particularly trying for PEA and the Army
cally with the Office of the Chief Engineer Communications Service (which the Army
and the Traffic Branch, which was wholly Communications Division became) were
responsible for Station WAR and the multi- the needs of encampments at home. The
plicity of activities centered there, including rate at which Army camps mushroomed in
technical supervision of the domestic wire population made it imperative that efficient
systems and the overseas radio and cable telephone service be supplied quickly, in-
circuits. That supervision had been some- deed almost overnight. Camp Edwards,
what curbed by a reorganization which had Massachusetts, provided a typical picture
given Army commanders greater control of a telephone plant serving a camp of many
over the domestic communications agencies thousands of men. The plant consisted of a
within their domains, including strategic rented 12-position, type 605-A Western
terminals of overseas radio circuits. The Electric switchboard with 800 lines and 17
Chief Signal Officer wanted the control of city trunks to the Cataumet central office, 4
such stations centered in the Army Commu- city trunks to the Falmouth central office,
nications Branch of his office rather than in
and 4 tie lines; 558 lines and an additional
service commands. But General Somervell,
137 bridged instruments served a total of
head of the Services of Supply, declined to
695 stations. It was estimated that the exist-
make an exception of even these until it
could be shown that conditions were un- ing 12-position board allowed 770 of the
satisfactory and that corrective action available 800 lines to be utilized and 962
through commanders had failed.31 stations to be served. But cables to the
By the turn of 1942 the amount of com- Cataumet central office were already
mercial service required by the Army was congested and any relief could come only
increasing rapidly. Arranging for, and to an through the release of cable pairs in use by
extent controlling, this activity became a the civilian population of the community
31
or by the curtailment of pay-station service
(1) Memo, CSigO for CG SOS, 23 Nov 42, for soldiers.33
sub: Army Com Sv, and 1st Ind, CG SOS to
CSigO, 28 Nov 42. SigC 300 Gen 1. (2) Ltr, 32
CSigO to CGs All Sv Comds, 16 Dec 42, sub: Prior- (1) Signal Corps Administrative Log, 1939-
ities. SigC 676.1 Gen 7, Dec 42. A case of un- 1945, OCSigO Orgn Charts No. 23, 1 Apr 43, and
satisfactory message flow in a signal office under a No. 26, 1 Jul 43, pp. 79-89. SigC Hist Sec File. (2)
service command arose in the Transportation Corps OCSigO Office Order 84, 9 Apr 43, par. 6.
33
where complaints were bitter about slow message Inspection Rpt, 1st Lt K. F. McKittrick, ACD
service for ship bills of lading between New York OCSigO, 4 Nov 42, sub: Telephone traffic facili-
and London. Joseph Bykofsky and Harold Larson, ties, Camp Edwards. SigC 676.1 Gen 6, Oct-Nov
The Transportation Corps: Operations Overseas, 42. For a general discussion of communication
UNITED STATES ARMY IN WORLD WAR II needs of Army camps, see Terrett, The Emergency,
(Washington, 1956), Ch. III. pp. 237ff.
440 THE SIGNAL CORPS
At each camp and post the situation dif- bility of making important outgoing calls.36
fered. The Plant Engineering Agency had Toll service, too, suffered from unthink-
constantly to survey and revise the wire sys- ing use. The holding of a connection from
tems to keep them in balance and to con- a camp near Lincoln, Nebraska, to Los An-
serve such materials as were in critically geles for an hour and forty-five minutes
short supply. By redesigning the construc- caused the War Production Board to rec-
tion plans for the outside telephone plant ommend a three-minute limit on private
at the Navajo Ordnance Storage Depot, calls. But General Stoner was reluctant
Plant engineers found it possible to re- to curb a soldier's conversation to that ex-
duce the requirements for scarce copper tent except as a last resort, and he declined
37
by 7,700 pounds; lead-covered sheathing to concur in the recommendation. Control
by 46,800 feet; jute protection by over of commercial communications in the
67,000 feet; and telephone instruments by United States relied in the main upon the
68.34 At Camp Devens, with 30,000 men, good faith of the individual citizen. The
the ratio of working lines to total stations Board of War Communications, of which
was much higher than at Camp Edwards the Chief Signal Officer was a member, es-
and engineers were endeavoring to reduce tablished a system of priorities for telephone
telephone facilities there also. calls essential to the war effort or to pub-
There was no general policy for the as- lic safety, with penalties for violations, but
surance of wire facilities in case of damage there was no monitoring or listening in to
or overloads. In some areas alternate rout- detect violations. The success of the system
ings were provided. The basic need was for depended upon the conscientiousness of the
a prearranged system of call controls fully persons calling.38
co-ordinated with the local telephone com- One of the largest single telephone proj-
panies, which would implement emergency ects inside the United States with which
plans in the event of disruption of the reg- the Signal Corps was concerned was not at
ular facilities.35 Until a situation arose in an Army camp. It provided communica-
Biloxi, Mississippi, which suggested what tions for the Hanford atomic energy site,
might happen in a major emergency, no ar- a large area under the Manhattan District
rangements had been made with the tele- in the state of Washington. Because a num-
phone companies to keep circuits open in ber of independent telephone companies,
times of stress for headquarters calls. All as well as the Pacific Telephone and Tele-
the soldiers stationed there had been called graph Company, normally operated in the
to duty by spot announcements over local area, it was considered necessary that the
broadcasting stations. As a result, so many Signal Corps furnish the telephone service
of them had telephoned the camp for in- 36
formation that central office trunks were (1) Inspection Rpt, 1st Lt K. F. McKittrick,
28-30 Sep 42, sub: Telephone traffic facilities, Ft.
overloaded and there had been no possi- Devens, Mass.; (2) Ltr, L. W. Hill, Southern Bell
Telephone Co., to Hq Fourth Sv Comd, 12 Nov
34
Report of Progress and Problems, Plant Br, 11 42. SigC 676.1 Gen 6, Oct-Nov. 42.
37
Nov 42. SigC 319.1 Digest of Prog and Problems. Ltr, Dir of Com Equip Div WPB to Stoner, 3
35
OCSigO R&W Action 1, Col French, Traffic Dec 42. SigC 676.1 Gen 7, Dec 42.
38
Br OCSigO, to ACD, 19 Feb 43, sub: Emergency Board of War Communications Order 20, 8
protection measures for Army telephone systems. Oct 42, with explanatory note, 29 Oct 42. SigC
SigC 676.1 Gen 6, Oct-Nov 42. AC-97.
GLOBAL COMMUNICATIONS 441
in order to avoid any confusion which might teletypewriter systems might immediately,
focus attention on this highly secret plant day or night, have to be relocated, supple-
"for manufacture of materials." So read mented, or rebuilt. A situation in the First
the directive to the Chief Signal Officer. Fighter Command was cited as an example.
This project, launched in January 1943, The command planned to move a unit to
called for 600 telephones in the adminis- Windsor Locks, Connecticut, and asked
trative area, another 300 for plant opera- ahead of time for the installation of a tele-
tions, and 90 pay stations; also 100 individ- typewriter circuit to that location, but not
ual lines and 950 two-party telephones to until four days after the unit arrived was
serve the population of the town housing the communications link provided. The
39
the workers. telephone company had new equipment on
This order alone would make a big dent hand, but no old. Before it could use the
in the nation's stockpile of telephone equip- new, it had to secure the permission of the
ment. Even the use of interoffice communi- War Production Board. The Signal Corps
cating systems was cutting into the low pointed out that if an air raid had occurred
supply of telephone instruments to such an in the interim, there would have been no
extent that the War Production Board sure means for alerting the unit. General
clamped down on these.40 Stoner proposed that the commanding gen-
The War Production Board's restrictions erals of the defense commands be given
on commercial communications applied broader authority to act in such instances,
to services for the military, just as they but the board was rather apathetic to his
applied to the usual service for the civilian proposals.41
population. The installation of automatic
telephone exchanges of over 100 lines was Traffic
forbidden. Companies were required to es-
The Traffic Branch of the Army Com-
timate and report to the board the costs of
munications Service, under Colonel French,
any needed materials and to locate old
the officer charged with the War Depart-
equipment for use if possible. If new equip-
ment Message Center on Pearl Harbor day,
ment had to be used, permission to install
continued to handle ACAN operation, cen-
it had to be obtained from the War Pro-
tering in radio station WAR. Message loads,
duction Board. For months the Signal Corps
"traffic" in the terminology of the com-
corresponded with the board, seeking to re-
municator, soared—radio, wire, teletype,
lax the restrictions as they applied to mili-
and then radioteletype, both over Army fa-
tary necessities under which telephone or
cilities and over leased commercial lines.
39
(1) Ltr, Dist Engr Manhattan Dist U.S. Engr Leased facilities alone, which handled some
Office to Maj Gen W. D. Styer, CofS SOS, 13 Jan 853,644 words at the Message Center in
43, sub: Telephone rqmts, and 1st Ind, WD SOS
to Stoner, 13 Jan 42. ASF CofS File, Sig Officer, the first week of June 1942, carried double
Office of the Chief. (2) Capt Lloyd B. Dodds, His-
41
tory of Plant Engineering Agency Army Communi- (1) WPB Gen Conservation Orders Nos. L-41
cations Service, 1941-1946, p. 181. SigC Hist Sec and L-50; (2) Ltr, Col Henry, Chief Engr ACD, to
File. Dir of Com Equip Div WPB, 24 Feb 43. SigC 676.1
40
Ltr, Dir of Com Equip Div WPB to Stoner, Gen 2, Feb 43. (3) Ltr, Stoner to Chief of Com
26 Nov 42. SigC 676.1 Gen 6, Oct-Nov 42. Br WPB, 6 Nov. 42. SigC 676.1 Gen 6, Oct-Nov 42.
442 THE SIGNAL CORPS
that load by the last week of October, an partment and a center for the entire ACAN
estimated 1,727,960.42 system. It also served as a proving ground,
Teletypewriter traffic in particular multi- a place for testing new projects, new equip-
plied again and again. TWX, Teletype- ment, and new methods touching commu-
writer Exchange, a service provided by the nication operations. Concomitantly it pro-
Bell System, was an application of tele- vided a training ground for many of the
graph, or more precisely, of the teletype- men who manned the wire and radio nets.
writer. It had long served commercial in- New developments in methods and in equip-
terests and it now served the Army increas- ment had their tryouts there. Improvisation
ingly. On 1 July 1942 TWX military sta- continued, as in the days of prewar pov-
tions within the United States numbered erty. Suitable equipment was still scarce
408. By the spring of 1943 they numbered and extraordinary demands were made on
1,776. During the same period of time, the makeshifts. WAR had the task of inte-
leased-line teletype and voice circuits mul- grating into the primary command net-
tiplied from 167 and 1,055, respectively, to work the many signal centers which sprang
440 and 2,268.43 up faster than they could be adequately
Radio station WAR and the associated supplied and faster than men could be
Message Center provided more than simply trained to operate them.
a communications office for the War De- From the time of the establishment of the
radio network in the 1920's, one of its pri-
42
(1) Memo, Stoner for Exec Control Br, 11 mary purposes had been to train operators
Jun 42, sub: Prog rpt 40, 4-10 Jun 42, Item 5a. and maintenance men in their wartime du-
SigC ( A C ) 319.1 Weekly Prog Rpt Army Com ties. The necessity for doing so did not abate
Br, Dec 41-Jun 42. (2) Weekly Digest Traffic Br,
Col French, 28 Oct 42, Item II A 1. SigC 319.1 with the building of big training centers in
Drawer 483, AC 133, Weekly Digest of Prog and World War II. At best, school training
Problems, Rpts from Divs, 7-30-42-12-30-42. stopped short of work experience. Yet Gen-
In mid-1942 Colonel French reported the gross
messages sent and the estimated work load for the eral Somervell had been emphatic that only
week of June (22-28 inclusive) as follows: men who were experienced in operating the
domestic network should go into the more
important fixed stations on foreign soil.
Thus, as messages transmitted by ACAN
increased many times over, the provision
of experienced communications cadres for
the overseas fixed stations was a consistently
Memo, Stoner for Exec Control Br, 2 Jul 42, sub:
Prog rpt 43, 25 Jun-1 Jul 42, Item 5a. SigC (AC) increasing drain on WAR, and on the other
319.1 Weekly Prog Rpt Army Com Br, Dec 41- stations of the domestic network, to which
Jul 42. only a small nucleus of highly skilled en-
Compare these figures with the report of War
Department Signal Center traffic a year later, for listed and officer specialists was perma-
the last two weeks of June 1943: gross messages, nently assigned. At WAR, where the mes-
443,498; gross words, estimated, 29,900,028.
Memo, French for Dir of Army Com Div, 3 Jul 43, sage volume was exceptionally heavy, op-
sub: 15-Day summary of traffic. SigC AC 319.1 erators newly graduated from the schools,
Digest, 30 Jul 42-1 Dec 44. lacking experience, were unable to pass the
43
Oakes, Army Command and Administrative
Communications System, Pt. II, p. 13. traffic along live circuits at a satisfactory
GLOBAL COMMUNICATIONS 443
pace, even under supervision, and were as a requirement secondary to a thorough
therefore unable to gain the experience they understanding of net procedure—the knowl-
needed. Some other means of developing edge of how to set up radio communications
speed and assurance in the fledglings had with other stations in the field and of how
to be resorted to. WAR and the 17th Sig- to transmit and receive accurately and
nal Service Company accordingly set up surely under combat conditions. The reports
training courses for the operators who, pointed out that the field operators in tac-
when they became able to stand the pace, tical nets, with whom the fixed-station men
would be assigned to stations beyond the would communicate in Morse code, were
Atlantic.44 usually in the 15- to 20-word-a-minute class
Similarly, the big ACAN station, WVY, anyway. But neither speed nor knowledge
at San Francisco conducted a comparable of radio procedures could be acquired with-
school for operators destined for the Pacific out experience. Field station operators badly
area. The courses consisted of approximately needed practice in code and training in tape
three months of training for radio opera- transcription. Yet they often lacked the
tors and six weeks for code clerks and IBM equipment upon which to practice after
radiotype technicians. The actual time the they arrived overseas.46
students remained in the schools depended, There were also complaints that fixed-
as at other training centers, upon the de- station operators who had been taught net
mands of the theaters for specialists. The procedure frequently did not route the traf-
graduate students first went through a pe- fic; it was done by message center clerks,
riod of operating under supervision and who had had no training in net procedure at
under actual working conditions but on sim-
the training centers from which they had
ulated circuits. When a student gained pro-
come.47 Complaints differed according to
ficiency on such practice lines, he was given
the viewpoint of the commander or the in-
a live circuit to work, under the close super-
spector and according to differing local sit-
vision of the regular operator. When he
uations. General Olmstead noted during his
had mastered that and attained a satisfac-
inspection trip to the overseas theaters in
tory speed—just when he was becoming of
the spring of 1943 that manual radio opera-
some value to WAR or WVY—he was
tors insisted upon transmitting with un-
ready for assignment to an overseas sta-
necessarily high signal strength, which
tion. Speed, however, was not the only
caused needless interference to other radio
qualification required. There were joint
stations, while they themselves were unable
and combined radio procedures to be
to receive signals through even moderate
learned and radio discipline to be observed.45
interference. He wanted all communications
Some reports from the field placed speed
units taught to depend to a greater extent
44
Ibid, pp. 65-68. 46
45
Combined American-British radiotelephone Msg, Maxwell, Cairo to AGWAR, 20 Aug 42,
procedure was approved by the Combined Com- CM-IN 7242. SigC 311.2 Gen—Cablegrams
munications Board on 9 December 1942. CCB 67/1 MT-206.
47
(corrected), 12 Dec 42. SigC 676.1 Gen 7, Dec Ltr, Col Louis Cansler, Actg Chief of P&T Sv
42. Joint Army-Navy Procedure, JANP, had been OCSigO, to CG ESCRTC, 15 Jul 43, sub: Msg
already instituted in the Pacific Theaters in Sep- center clerk tng. SigC 353 Ft. Monmouth 2 (RTC)
tember 1942. Jun-Jul 43.
444 THE SIGNAL CORPS
on radio in case wire failed during intensive But even with these extra measures of prac-
48
bombardment by the enemy. tical training, both officers and men still
But somehow, with surprisingly few fail- lacked seasoning in net operations as they
ures, the Army's communicators accom- scattered over the world to become individ-
plished their jobs despite initial inexperience ually responsible for the important links in
and shortages of facilities. They became the command chain of communications.
skilled through working the circuits under The stations of the even more extensive
seemingly unworkable conditions. They AACS were no better off for seasoned men.
came to believe that only by eternally plug- Although the operation of these latter sta-
ging at the job through static or man-made tions was the responsibility of the Army Air
interference could an operator learn to rec- Forces, in many places Signal Corps men
ognize under stress the tone of the signals in- and airmen worked side by side and often
tended for him as surely as a baby recognizes interchangeably on the administrative and
its mother's voice. Necessity accomplished air operational circuits with the odds in skill
what training could not. going to the Signal Corps men.51
By 1943 replacement training centers and
schools in the United States, as well as Sta- Security
tion WAR, had initiated more intensive
training for fixed radio station teams. Prac- The functions of the third of the main
tice circuits extended from WAR to Fort subdivisions of the Army Communications
Monmouth and to Camp Crowder. Radio Division, the Army Security Branch (which
operators, code clerks, message center clerks, supervised the Signal Security Agency, a
and message center chiefs were receiving field installation shrouded in secrecy at
highly practical training through this Arlington Hall and Vint Hill Farms, Vir-
means.49 Officers to be assigned to fixed sta- ginia) were, in brief, to preserve the se-
tions overseas also were receiving practical curity of the communications of the United
experience in their duties at WAR. Most of States Army through the compilation and
the students were fresh from Officer Can- distribution of codes and ciphers (one se-
didate School. WAR taught them the rudi- curity system in use, one in reserve, and
ments of all phases of signal center opera- one at an isolated point on the way to each
tion, including a smattering of cryptography holder of a system at all times) and to ac-
and traffic security. Beginning with groups quire as much enemy information as might
of 20 in October 1942, the program soon be gleaned by piercing the enemy's security
expanded to accommodate classes of 110.50 defenses. Throughout the war a weak point
in maintaining the secrecy of messages was
48
OCSigO R&W Action 1, Col William D. Ham- the number of persons who saw practically
lin, Exec Officer, to Sig Troops Div, 13 May 43, every one of them. A survey in the War De-
sub: Discipline of radio nets. SigC EO 333.1
Directives (CSigO's trip) 1943. partment showed that number to be from
49
(1) Ltr, Gen Van Deusen, CG ESCTC Ft.
51
Monmouth, to CSigO, n.d., sub: Rpt on status of This despite a difference in pay which in 1943
822d Signal Fixed Radio Station Co, and 1st Ind, averaged $1,152 per year for Air Forces enlisted
OCSigO to CG ESCRTC, 5 Feb 43. SigC 352 Ft. men and for Signal Corps enlisted men only $780.
Monmouth 1, Jan-Feb 43. (2) Daily Prog Rpt, Charles P. Baer, Personnel Classification in Army,
Radio Sec, Traffic Br, 16 Apr 43. SigC AC 319.1. Navy, and Air Forces, May 1947. Armed Forces
50
WD Press Release, 23 Oct 45. Staff College M-20.
GLOBAL COMMUNICATIONS 445
300 to 500. In General Stoner's opinion, it ciphers, and authenticators was as necessary
was this fact which constituted the "big on wire circuits as on radio channels.54 Tele-
leak" in secret information.52 phone privacy equipment, or voice scram-
Aside from the compilation and use of blers, were in great demand by com-
codes, there were many other aspects to manders but they did not completely safe-
communications security and many oppor- guard conversations. Since they gave users
tunities for the unknowing or careless vio- an unwarranted assurance of safety, they
lations which were chargeable to military constituted something of a risk and their
men of all ranks. Message senders frequently use was sometimes frowned upon.55
Verbose messages were a constant con-
were unaware of what constituted breaches
cern. They gave the enemy intercept service
of security. A radiogram sent to a newly
too much material to analyze, thus jeop-
occupied area in the Pacific, for example,
ardizing codes, and they cluttered up radio
although in code, carried the address in the channels unnecessarily and overburdened
clear, thus revealing the presence of troops the operators. The Signal Corps continu-
moved secretly to the island.53 ally urged users of the networks to cut down
Also, security required that the enemy's verbiage. But the brevity of "We have met
radio traffic be constantly analyzed for the the enemy and they are ours" was seldom
cumulative picture it might give. Against achieved.
enemy analysts, the Signal Corps security The Army's monitoring activity gained
organization effectively used deceptions in greater headway in September 1942 with
American transmissions, such as padding the opening of the Vint Hill Farms station,
traffic, setting up dummy stations, and other a part of the Signal Security Agency, located
radio camouflage. Such radio forgery was near Warrenton, Virginia.56 The Federal
an art practiced by the enemy also with Communications Commission also had an
great energy. Wire communications were elaborate monitoring and intercept system
likewise subject to interception and under in operation. In February 1943 Admiral
certain circumstances the use of codes, William D. Leahy, acting for the Joint
52
Chiefs of Staff, questioned the usefulness of
(1) Oakes, Army Command and Administra-
tive Communications System, Pt. II, p. 54. (2) the Federal Communications Commission's
Stoner, Army Communications, 24 Sep 45, p. 7.
54
This secret Signal Corps activity, under the name WD, Signal Communications and the Staff,
Signal Intelligence Service (SIS), commanded by Feb 43. SigC 380.01 SMI, 1941-43 (CEB).
55
Lt. Col. Rex M. Minckler, numbered 181 officers, (1) 2d Ind, CSigO to Chief of Transporta-
enlisted men, and civilians in Washington and 150 tion, 7 Nov 42, on Ltr, Brig Gen J. R. Kilpatrick,
in the field at the beginning of World War II. The Hampton Roads POE, to Chief of Transportation,
activity, quickly outgrowing its quarters in Office 30 Oct 42, sub: Spec telephone facilities. SigC
of the Chief Signal Officer headquarters, moved in 676.1 Gen 6, Oct-Nov 42. (2) In the early years
mid-1942 to Arlington Hall, formerly a private of the war the radiotelephone conversations be-
school, with ample grounds for expansion, located tween Roosevelt and Churchill, though scrambled,
in Arlington, Virginia. Army Security Agency, Mar were unscrambled by German experts and placed
48, A Lecture on the Origin and Development of on Hitler's desk within a few hours after their in-
the Army Security Agency, 1917-1947 (unsigned), terception, according to a German authority. Wil-
pp. 29-33. SigC Hist Sec File. helm F Flicke, MS, Pt. III, pp. 251-54. SigC Hist
53
1st Memo Ind, ACSigO to CofS, 27 Feb 42, Sec File.
56
on Memo, Asst Secy WDGS for TAG, and CSigO, Prog and Problems Rpt, Airways and Fixed
25 Feb 42. SigC 311.23 Gen. Radio Br, 16 Sep 42.
446 THE SIGNAL CORPS
activities in this field, and sought the trans- east and north, and to defensive and offen-
fer to the Army of FCC manpower and sive planning alike, it was the first zone of
59
equipment employed in radio intelligence communications.
work. He assumed that FCC was dupli- The interruption of submarine cables had
cating work being done better by the mili- been a matter of concern to Colonel Sadtler
tary services, and that its system was en- soon after America's entry into the war and
dangering the security of military radio he had directed Maj. Clinton B. Allsopp of
intelligence. No decision was reached until his office to study the possibility that they
early fall when President Roosevelt, ap- might be tapped by induction methods.
parently with the concurrence of the Chief Major Allsopp's report had been skeptical
Signal Officer, declined to order the cessa- of the results that interceptors might obtain.
tion of FCC's radio intelligence efforts.57 His opinions were shared by engineers and
Before the landings in North Africa, when officials of the commercial cable companies,
it was essential that the Army know im- who had felt that although eavesdropping
mediately of any hint from enemy or neu- might be tried, the possibility of intelligible
tral countries that a counteroffensive was signals was remote.60 Therefore, as long as
on the way, signalmen in the security or- the cables remained uninterrupted, the users
ganization monitored all major foreign put aside concern about their security.
broadcasts—those emanating from Algiers, A break in a commercial cable in the
Rome, Berlin, Madrid, Stockholm—trans- Caribbean area in August 1942, however,
lated them, and had the information they had brought the matter to the fore again.
contained in G-2's hands at Gibraltar in a By autumn it was conceded that perhaps the
58
matter of minutes. cables had not been cut because they were
There were many aspects to safeguard- serving the enemy too well. The overseas
ing the Army's message traffic which en- messages of commercial shipping and ma-
tailed continuing and constant vigilance to rine insurance concerns, by government de-
see that safe means of transmission were cree, had been confined to submarine cable
employed. The Atlantic submarine cables, transmission on the assumption that under-
for example, were suspected of being an un- seas wire provided greater security than ra-
safe means of transmission. The largest con- dio circuit.61 But now it seemed possible that
centration of them lay in shallow water the enemy had not cut the cables because
along the eastern seaboard and to the south,
the Germans and Japanese found them val-
waters in which the greatest volume of sink-
uable sources of intelligence. So reasoned
ings of Allied vessels occurred. The area of
the Caribbean was important in 1942. To the Signal Corps, and in October, with the
the Navy it was the scene of U-boat attacks assistance of the Navy, Signal Corps engi-
upon vital coastal shipping and of possible neers conducted tests off Long Island which
threat to the Canal; to air transport, it was 59
Memo, E. K. Jett, Chairman Coord Committee,
the first leg of the long ferrying route to the to Bd of War Com, 4 Sep 42, sub: Inauguration of
emergency radiotelegraph circuit between New
57
Congressional Record, 78th Cong, 2d Sess, Vol. York and San Juan, Puerto Rico. SigC AC-91.
60
90, Pt. I, 835ff; Pt. 2, 2719ff; Pt. 3, 3201ff. Memo, Allsopp, ACD, for Sadtler, Chief of
58
Speech by Gen Stoner to American Signal ACD, 7 Jan 42. SigC AC-94.
61
Corps Association, New York, 27 Feb 46, p. 10. Board of War Communications Order 28, Oct
Tab A, Com File. SigC Hist Sec File. 42. SigC AC-97.
GLOBAL COMMUNICATIONS 447
revealed that there was not a type of sub- vital to it were ever more airfields and ever
marine cable signal which could not be de- more radio and navigational aids. By the
tected and recorded. Thereafter cable users end of 1942 the estimate for airfields stood
were required to encode all messages.62 at 900, to be built within a year and a half.
However, postwar investigations in Ger- As the Air Transport Command mapped
many and in Japan failed to uncover any its sky routes, Signal Corps' Army Commu-
evidence that the enemy ever intercepted nications Service charted chains of fixed
messages passing through deep sea cables. radio stations. Greater distances than ever
In fact, the cables were rarely cut because before were involved. Whereas transmitter
of the difficulties involved, according to powers of 100 to 400 watts had previously
Maj. Gen. Francis L. Ankenbrandt, a Signal sufficed, now outputs of 3 to 10 kilowatts
Corps officer who transferred to the Air became necessary. To handle large traffic
Forces.63 Furthermore, submarine cables loads signalmen were now installing more
were devoted principally to commercial, and more radioteletype and automatic en-
not military, use. The Army depended upon ciphering equipment. These very new de-
its ACAN radios, whose transmissions were vices required better antenna systems. Space
protected from enemy Cryptanalysts by diversity, frequency diversity, and polari-
Signal Security Agency's highly compli- zation diversity of antenna arrays became
cated and foolproof cipher machines. In standard in order to eliminate fading ef-
these the Signal Corps took special pride. fects at high frequencies over long-range
"There isn't anybody else that has got auto- radio circuits which depend upon sky waves
matic coding that we know of at the pres- reflected from the ionosphere.65
ent time," General Stoner told a board of In general, commercial equipment of
officers in Washington on 24 May 1943, every description eked out the meager stocks
adding with understandable pride that the with which the Army Communications
ACAN "is the finest network in the Service met AACS needs. Last minute
world." 64 changes in Air Forces requests, improper
marking of shipments by manufacturers,
From the Caribbean to the Middle East conflicting instructions from the Air Forces
and the Signal Corps, the inability of manu-
The invasion of North Africa gave im- facturers to produce on schedule, scattered
petus to communications all along the South
supply sources, substitution of items—all
Atlantic routes—to the long-established
these complicated the supply of equipment.
ACAN stations as in Panama and Puerto
Rico, and especially to the very new AACS There were organizational complications
stations. For air transport was vital. And also. Col. Francis L. Ankenbrandt, Signal
Officer of the United States Army Forces
62
Memo, Gen Code, for CG SOS, 26 Oct 42,
65
sub: Tests on security of cable com. SigC 676.4 (1) Memo, Col Parker, Plant Br, Funds Re-
Intercept. quired for Expansion of Procurement Program for
63
Ltr, Gen Ankenbrandt, USAF ACOS Com- Fixed Communications Equipment for Task Forces
munications, Hq Allied Air Forces Central Europe, and Other Miscellaneous Activities and for Neces-
to Gen Ward, Chief of Mil Hist, DA, 13 Mar 52. sary Labor Involved for Construction and Installa-
SigC Hist Sec File. tion; (2) OCSigO R&W Action 1, Parker to Army
64
Proceedings of Board to Investigate Communi- Com Sv, 20 Nov 42. SigC 121.2 Task Forces 1,
cations, Tab O, p. 12. 1942.
448 THE SIGNAL CORPS
in the South Pacific Area, touched upon a loading on the vessel. Equipment for one
central problem when he commented in remote but vital station was gathered from
June 1943 that "all of the dealings with the supply sources scattered throughout the
AACS all the way back to Washington have eastern portion of the United States. Offi-
a tinge of the old 'Air Corps-Signal Corps' cers and civilian engineers, who were flown
battle," which resulted in "lack of com- from PEA to the various locations, person-
plete understanding . . . and considerable ally convoyed the entire shipment to the
petty wrangling."66 port of embarkation and saw it on board—
Evidently the arrangements of Signal all within thirty-six hours—"not properly
Corps' Plant Engineering Agency, under handled but it made the boat." 68 Even then,
Colonel Parker in Philadelphia, were some- General Stoner was to complain that Col-
what unrealistic. For example, PEA's en- onel Parker's organization lacked one thing,
gineers, accustomed to peacetime commer- a "whip cracker" to get things done.69
cial practices and remote from the AACS In setting up the fixed stations for the
stations for which they were prescribing, AACS, the Corps of Engineers did the pre-
sometimes returned requisitions to their liminary work—cleared the ground, dug
sources with a high, wide, and handsome holes, anchored poles and guy wires, and
authorization to buy locally, when the in- erected the shelters and antenna towers—
stallation for which the items were needed either with their own troops or with labor
stood hundreds of miles away from a deal- secured through local contracts. The Signal
er's shelves. To draw an illustration from Corps installed the communications equip-
the Pacific area, PEA's field headquarters ment and the Air Forces operated it, a di-
at San Francisco, which was intended to vision of responsibility which had been vig-
look after AACS needs in the Pacific orously debated and finally confirmed dur-
through Hawaii, was still too remote. "The ing the course of 1942.70 But in practice
fact that your office," Ankenbrandt wrote this division of labor was not always fol-
to the Office of the Chief Signal Officer, lowed. There were places in which the Sig-
"persisted in handling all of our projects nal Corps had to do the construction work
and the engineering concern from Hawaii, because the Engineers were not there. There
4000 miles away from where the work is were times when the Army Air Forces
actually being done does not help matters, helped. Sometimes the Signal Corps even
either. Hawaii, San Francisco and Wash- operated the installations.71
ington are all too far away to be able to
do the detailed projecting and engineering 68
OCSigO R&W Action 1, Maj W. C. Thomas
which is required at each site." 67 to Chief of Plant Br, 20 Dec 42, sub: Inspec trip
to Richmond holding and reconsignment point, Bell
To avoid as many complications as pos- Bluff, Va., and Hampton Roads POE. SigC 319.1
sible, PEA initiated the practice of assem- Inspec Rpts.
69
bling fixed-station equipment for overseas, Memo Routing Slip, Gen Stoner (unsigned but
in his handwriting) to Col Treest, 19 Aug 43.
shepherding it to the assembly point and to SigC 321 Plant Engineering CEB, Dec 42-Dec 45.
the dock, and then actually supervising its 70
(1) CSigO, Annual Report, 1943, p. 57. (2)
See above, pp. 281ff.
66 71
Ltr, Ankenbrandt to Lanahan, 5 Jun 43, SCIA There were also difficulties in apportioning
File 8 (see Bibliographical Note), Ankenbrandt- responsibilities between the Corps of Engineers and
Newhouse Rpts, 1. the Signal Corps, especially in Trinidad, in 1942.
67
Ibid. See above, p. 107.
GLOBAL COMMUNICATIONS 449
A most difficult task for the signalmen, stallations throughout the world was prob-
when the Engineers were absent, was sur- ably greater than that in any other item of
veying the antenna layouts, where any ap- equipment—steel poles and wooden poles,
preciable error in computing the great circle the latter ranging from light bamboo to
courses could nullify the effectiveness of the hard mahogany. Even live trees were used.
whole antenna array by misdirecting the Inside equipment for the stations also com-
radio beam.72 The Engineers had their prised a variety of components, but every
troubles, too. Signal Corps engineering effort was made to standardize the trans-
plans for installations in faraway places sel- mitters and receivers. Everywhere, from
dom anticipated the extent to which condi- 1943 on, Signal Corps teams from the Plant
tions varied in the different areas, even in the Engineering Agency provided radioteletype
same part of the world. Along the South At- facilities for the world-circling stations of
lantic ferry route, for example, soil ranged the AACS.73
from sand dunes at Atkinson Field in Brit- Like Signal Corps' own ACAN system,
ish Guiana to swampland at Waller Field in the AACS chain suffered not only from the
Trinidad; from rock that had to be blasted general scarcity of equipment but also from
at Ascension Island to areas of level, well- the hazards of shipping. Consignments from
drained clay land along a part of the north- the United States often arrived minus im-
ern coast of Brazil. To anchor poles in the portant pieces, with generator castings
sandy soil of British Guiana, the Engineers smashed, shafts and dials jammed, and
cut the tops and bottoms from steel oil wires severed. The breakage of ceramic in-
drums, welded two drums together, set the sulators was heavy. Crystals, roughly han-
pole in the cavity, and filled it in with ce- dled in transit, reached their destinations in
ment to provide a strong footing. poor condition. And because the AACS was
Transporting poles was a knotty prob- a new project, the assignment of frequencies
lem and never-ending. They took up so for the system, even in areas contiguous to
much cargo space that wherever possible the United States, necessitated months of
they were obtained locally. Those for the negotiation, experimentation, and revision.74
Brazilian stations were floated down the In areas beyond the Atlantic the problem
Para River from the jungle. The 70-foot was further aggravated by a complexity
poles for the rhombics were especially hard of international interests.
to get and to transport, and their weight The flying route of the South Atlantic
of about 3,000 pounds called for heavy lift- Wing of the Air Transport Command (the
ing equipment. Because it was so difficult area in which the Southeastern Sector of
to transport the unwieldy antenna supports, PEA operated) began in Miami. Following
either locally or from the United States, the down along the Antilles chain of island bases
Signal Corps often resorted to the use of over the Caribbean, it skirted the northern
substitute wooden antenna towers. The coast of Brazil: Georgetown, Paramaribo,
variety in poles used for communications in-
73
(1) Melia, Signal Corps Communications in
72
Incl 1, Memo on Training of Fixed Station World War II, Ch. I. (2) Capt Sidney L. Jackson,
Teams, Majs James A. Greene, Jr., and Ira P. Radnese "100": Chapter II of International Radio
Doctor, to OCSigO R&W Action 1, Col Carl H. Circuits (1944), SigC historical monograph E-2b,
Hatch, ACD, for PEA, 29 Apr 43. SigC 676.3 passim. SigC Hist Sec File.
74
Gen. CSigO, Annual Report, 1944, p. 143.
264-211 O - 78 - 30
450 THE SIGNAL CORPS
Belem, and Portuleza, to Natal, the eastern- routes—frequently the systems of the com-
most point of South America. Across the mercial airlines, such as Pan American Air-
ocean on the Gold Coast of Africa, Accra ways in Africa, and equipment installed by
provided a logical terminus for planes flying the Civil Aeronautics Administration and
the southern route at a time when Dakar the high frequency direction finding systems
was held by the Vichy French while the of the Federal Communications Commis-
Axis nations controlled most of northwest sion. In British territory, the AACS made
Africa. Between the Brazilian bulge and the use of the systems of the Royal Air Force.77
Gold Coast, however, stretched the South Initially the ferry route across Africa to
Atlantic, which few planes of those days the North African theater extended from
could span without refueling. Strategically Accra to Oran, via Kano. The first flight on
located midway, tiny Ascension Island pro- this link had been made on 13 November
vided an airbase where Signal Corps units 1942. Three days later the Air Forces di-
installed AACS radio, navigational aids, rected that equipment for an AACS station
and search radar.75 be installed at Kano. But the Kano-Oran
As the plans for communications along hop was a long one, and when Dakar was
the South Atlantic route were changing opened to the Allies in December, that point
before they could be implemented, the replaced Accra as the terminus of the south-
Africa-Middle East Wing of the Air Trans- ern route to North Africa and the United
port Command extended the air ferry over- Kingdom. Until arrangements could be
land in Africa, and the RADME (Radio made to land there, Bathurst in neighbor-
Middle East) network began to take shape. ing Gambia was used. Then the bulk of
It connected with the RADNESE (Radio the travel from South America was switched
North-East South-East) at Marrakech, from Accra to Dakar, and the Kano-Oran
French Morocco, and it continued on across link was abandoned in favor of a route along
North Africa to Abadan, Iran, and thence the west coast to Marrakech.78 General
to Karachi, India. Karachi marked the end Arnold's headquarters pointed out that the
of the RADME network and the beginning single kilowatt Pan American Airways trans-
of another which would take the line of mitter at Accra could communicate with
AACS stations on to Calcutta, Chabua, and Oran, and with Casablanca too, provided
Kunming, and eventually, by 1945, back to sufficiently powerful radios were installed
Manila. When completed, the AACS would 77
(1) Ltr, James Lawrence Fly, Chairman of
possess a world-wide radioteletype network, FCC, to Olmstead, 6 Oct 42. OCMH, SigC FCC.
(2) Lt Col Brooke Sawyer, OCSigO, Signal Situa-
paralleling the ACAN system.76 tion in West Africa, 12 Oct 42. SigC LP 676.3 Africa
The fluidity of war caused many changes (Adm) Aug 42-Aug 43, PEA 2.
in plans. Often the fixed installations of the In October 1942 the Civil Aeronautics Adminis-
tration program provided for the installation of in-
AACS lagged far behind the fast moving strument landing systems (ILS) to serve one runway
air ferry, which in the interim used whatever at each of 106 airfields, although by April it was
found that the program would not proceed accord-
communications facilities it found along its ing to schedule. Ltr, Dir of Federal Airways, CAA,
to Dir of Communications AAF, 29 Oct 42; Ltr,
75
Capt Dulany Terrett, Official History of the Parker to Dir of Federal Airways, 9 Apr 43. SigC
South Atlantic Division, Air Transport Command, 121.2 CAA 1, 1942.
78
1946, passim. AAF Hist File, 15153. Ltr, CG, AAF to CSigO, 16 Nov 42, sub: CAA
76
Jackson, Radnese "100," p. 2. Ranges. AAG 413.44 C, Radio.
GLOBAL COMMUNICATIONS 451
troops in November 1942, the fixed admin- Radio was regarded as the primary means
istrative network stations faced almost as of communication in Africa because of the
fluid a situation as did the tactical net- great distances, the scarcity of civilian wire
works. Men and materials were moved from systems, and the poor roads. And in general
area to area to provide service under the it was fairly dependable, although subject
103
changing conditions. occasionally to erratic performance over
Communications in the Libyan area were long desert distances. Nevertheless, when-
made possible only by the transfer of signal ever the American Army went into an
men from the Levant Service Command area, telephone lines became indispensable.
and by the use of British equipment or After the North African invasion, the Allies
American equipment borrowed back from took over for military use about three
the British. The first radio installation in fourths of the 40,000 circuit miles of exist-
the Delta Service Command, which em- ing wire plant, assuming responsibility for
braced Egypt and such adjacent terri- its maintenance and rehabilitation. They
tory in the western desert as might be added another 5,000 miles of open-wire line,
occupied by the Allied forces, consisted including carrier and repeater equipment.
of a 1,200-watt Pan American Airways The maintenance of these circuits was in
transmitter borrowed from the signal of- itself a stiff task. The communications sys-
ficer of the Air Transport Command at tems had been built up independently, by
Accra and operated by the 40- naval, ground,
kilowatt team and air units—British,
of Company C, 850th Signal Service Bat- French, and American. Methods and equip-
talion, on detached service from the Eritrea ment differed and much co-ordination was
104 105
Command. involved.
The Bengasi station and the Tripoli sta- The wire system in the Africa-Middle
tion, both in the network which centered at East area—the Sudan, Eritrea, and extend-
Cairo, went on the air in February and ing to and including Iran—could be com-
March 1943, respectively, using SCR-188 pared to nothing in the United States ex-
and SCR -299 sets supplied by ceptthe
possibly
British.a few remote farmers' lines.
Bengasi received an SCR -299, Therealsowere
fromexceptions—a number of su-
the British, about a month later. The Trip- perb lines which the Italians had built over
oli station obtained a complete BC-447 difficult mountain terrain. The poles were
fixed station assembly in April, only to be of steel or of reinforced concrete because
closed down finally in October. A high- termites quickly damaged untreated wood.
speed channel between Algiers and Cairo Otherwise, such switchboards as served the
opened in March. lines of the Egyptian States Telephone and
103
With the dissolution of the North African and Telegraph System were antiquated and
the Iran-Iraq Military Missions, the United States badly worn. Repeater stations did not exist.
Army Forces in the Middle East established a serv-
ices of supply, with four separate service com- Contracting with the Egyptian company for
mands—Eritrea, Delta, Levant, and Persian Gulf. extensions of its service was a slow process
Rpt of Activities, 15 Sep 42. SigC 319.1 Diary,
Apr-Dec 42, OD-2.
requiring considerable supervision by Sig-
104
Ltr, Maj Fred L. Rauch, Sig Officer Delta
105
Sv Comd to Hist Officer USAFIME, 10 Aug 44, (1) Memo cited n. 91. (2) Signal Corps In-
sub: Hist record, Sig Sec. SigC 314.7 SigC MESC, formation Letters, No. 24 (November, 1943), p. 7;
Folder 70. No. 25 (December, 1943), p. 5.
458 THE SIGNAL CORPS
nal Corps men, often through a civilian in- munication was entirely by radio. The first
terpreter of doubtful ability. Eventually radio station installed by the 833d in the
even the contracts which had been entered Persian Gulf Command was that at Basra,
into were canceled, and the Signal Corps in Iraq, a link in the great equatorial belt
took over the building of such additional of ACAN stations: Asmara, Cairo, Karachi.
lines as might be necessary.106 Other stations followed at Andimeshk, Ah-
In January 1943 the Signal Corps agreed waz, and Tehran. During December and
to provide emergency repair parts for the January, ports along the Persian Gulf were
main Eritrea exchange maintained by the linked into the network—Bandar Abu
British at Asmara. But by the time the list Shehr (Bushire), Khorramshahr, Abadan,
of what would be needed was received—it and Bandar Shahpur. A separate network
amounted to a major overhauling of the was established for the Motor Transport
entire installation—the diminishing need of Service and semifixed stations were set up
the United States troops there for telephone along the supply route for emergency use.108
service led to a decision that the British Main stations of the British radio network
must supply the equipment if they wanted were located at Baghdad and Basra, with
to rehabilitate the system. By the spring of terminals in Egypt, Palestine, Syria, Iran,
1943 central Africa no longer figured large and India. The only other radio installation
in military plans. As the southern ferry was a commercial station operated by
route was virtually abandoned, the admin- Iranian Posts and Telegraphs at Tehran,
istrative radio circuits planned for central which communicated with London and
Africa were not developed and the AACS New York. Later, in 1943, Tehran and Ah-
stations took over the small amount of ad- waz obtained broadcasting stations planned
ministrative traffic that remained.107 Work and installed by the Signal Corps for the
shifted to the north, where the 435th Sig- Office of Technical Information.
nal Construction Battalion (Aviation) Radio traffic in the area increased rap-
would build an eight-wire telephone pole idly. From about 20,000 groups in No-
line from Bengasi to Tobruk to serve the vember 1942, the count rose to 180,000 two
British Eighth Army and the Ninth Air months later. By April 1943, with practically
Force. The 95th Signal Battalion would no increase in equipment or trained opera-
take over the telephone service in Iran and tors, more than 800,000 groups a month
relieve the British signal units there. were passing over the network, although
Beyond Africa, detachments of the 833d not without worrisome delays. These would
Signal Service Company had already ar- decrease only with the provision of better
rived in the Persian Gulf Command in or-
equipment and the arrival of additional
der to extend the administrative radio net-
operators. With the later installation of
work along the new and safer supply route
to Russia. Between Russia and Iran, com-
teletypewriters, wire would become the
primary means of communicating within
106
Sawyer, Signal Situation in West Africa, 12 the command, and radio the means for long-
Oct 42. SigC LP 676.3 Africa (Adm) Aug 42-
Aug 43, PEA 2. 108
107
Memo, Col Watters for Col Lanahan, 3 Mar Capt Sidney L. Jackson, Communications in
43, sub: Rpt on projects listed in Col Townsend's the Persian Gulf Command: Chapter IV of the
Memo, 27 Jan 43. SigC 319.1 Daily Rpt, All Secs Theater Fixed Networks (1944), SigC historical
Office Planning Dir, Jan-Jun 43. monograph E-ld, p. 7. SigC Hist Sec File.
GLOBAL COMMUNICATIONS 459
distance communication and a stand-by for headquarters of the command to Tehran in
emergencies. January 1943, British Signals came to the
When American forces arrived in the rescue with a 40-line German magneto
Middle East, two telephone trunk lines, a switchboard and all the Swedish handsets
part of the civil system taken over by the Brit- they could spare.
ish Army, provided connections to Haifa, In March 1943 the 95th Signal Battalion
Palestine, and from there to Syria and arrived, but not its organizational equip-
Egypt. The equipment included American, ment. Ten EE-97 teletypes, three BD-100
British, and Indian types, with some Ger- switchboards, and other items of organiza-
man desk-type telephones. Poles were of steel tional equipment scheduled for January
tubing, with tapered sections eight feet long, shipment and due in April would not reach
of different diameters, so that varying the unit until September, along with the
heights and strengths might be reached. carrier equipment requisitioned by Colonel
Telephone wires were copper pairs; tele- Thomas. Moreover, the shipment had been
graph wires, single iron-strand.l09 The Brit- short a number of items when it started out
ish were operating a net of four teletype and these were not shipped until still later.110
machines on the railway circuits, the print- Nobody knew when they would reach
ers installed at Tehran, Dorud, and Andi- Iran. Although the Chief Signal Officer had
meshk, with physical relay at Dorud. Only urged that Signal Corps troops be "unit
the lines of the Anglo-Iranian Oil Company loaded" to prevent just such separation of
to the south employed carrier equipment. troops from their equipment, many other
There was one bright spot in the picture, units as well as the 95th arrived at their
however. The steel pole line supporting the destinations minus equipment and had to
poor railway circuits was capable of sup- borrow and improvise and do the best they
porting also the high-grade carrier circuits could with what they had.111 Actually, the
which Col. Samuel H. Thomas, Director of idea of unit loading conflicted with the
Signal Service, Persian Gulf Command, facts of shipping. Men were carried by
proposed to install from Ahwaz to Tehran, transports, which could not also convey
and from Ahwaz to Bandar Shahpur, Khor- equipment in Army bulk. The latter had to
ramshahr, and Cheybassi. In this one place, go in cargo ships. The manner of shipping,
at least, poles would be no problem. But even of issuing T/BA signal equipment, was
other needed equipment, in particular a frustrating from many points of view. The
C-5 carrier system, could not be expected priorities of units, before they were assigned
before September 1943. to task forces, were so low that the men
Meanwhile, the signal detachment which received little of the equipment they would
had come with the December 1942 contin- use overseas. Then when priority was raised
gent of troops, using its own BD-71 and
BD-72 switchboards and borrowing equip- 110
Rpt of Maj Giles H. Gere, SigC, 1 Apr 44,
ment from the British, provided telephone sub: Instl, opn, and maint of teletype com facilities
service for Khorramshahr, Basra, Ahwaz, in Persian Gulf Command. SigC A46-160 Tele-
type ( 5 ) .
and Andimeshk. With the movement of the 111
Memo, Maj J. E. Gonseth, Jr., Dir of Plan-
ning OCSigO, for Dir of Planning, 20 Aug 42, sub:
109
Mil Attache Rpt 21, Baghdad, Iraq, 10 Sep Daily rpt, Equip Rqmts Sec. SigC 319.1 Diary,
42, IG 6540. SigC AC-69 Iraq. Apr-Dec 42, OD-2.
460 THE SIGNAL CORPS
to permit a unit to move with a task force, four to six in the afternoon, but the nature
it was too late to train men on the equip- of the signalmen's operations permitted no
ment even should it be received. When it such lull. Temperatures high enough to kill
was shipped separately, the men and their mosquitoes and sand flies drained human
working tools sometimes did not meet for energy rapidly, and men less able to stand
months, and then they were entirely conditions in the low areas were stationed in
unacquainted.112 Thus the 95th Signal the mountain districts in summer. Others
Battalion in the Persian Gulf Command were rotated to Tehran for a two-week tour,
had little of the equipment it needed when with light duties, to enable them to relax
it took over communications from the Brit- and replenish their physical reserves. The
ish. There were 700 miles of copper wire to 95th Signal Battalion, which represented
be strung, when it should be received, along over half the signal troops in Iran, and the
the existing route of the railroad, which 833d Signal Service Company were fortu-
wound its way up the mountains to Tehran nate in having most of their men stationed
through 130 tunnels in eighty-four miles. in the mountainous parts where tempera-
Insulated tree wire was requisitioned be- tures ranged from below zero in winter to
cause it was feared that electrical leakage a mere 110 degrees in the summer and
from bare wire in the tunnels would be too where the humidity was low all year around.
great for satisfactory carrier operation. But The 231st Signal Operations Company
since the Plant Engineering Agency could which arrived in June, drew the hot, humid
not locate eighty-four miles of such wire central and port areas.114
line, it was therefore decided to use bare The weather was quite as hard on the
wire and to offset the transmission losses by equipment as on the men. Lubrication
inserting repeater stations at Sultanabad maintenance checks had to be made at 150-
and Dorud. Luckily, General Olmstead was hour intervals, instead of the normal 500
in the area in April 1943 and he directed hours, and dust and sand in the port area
his office to hurry the shipment of the wire wore out movable parts at five times the
for the Basra-Tehran line.113 normal rate.115 All these things added to the
Summer was coming on then. The men difficulties inherent in circling the world
newly arrived from a temperate zone en- with modern communications installations.
dured such climatic conditions as they had
never encountered before. In the port areas From India to Australia
of Iran summer temperatures soared, hu-
midity was high, and insects swarmed. It Between the Persian Gulf Command in
was the custom of the natives to work only the Middle East and the Pacific area, where
from six to eleven in the morning and from military communications lines were reaching
112
out from the Western Hemisphere, lay the
Weekly Prog Rpt, Opns Br OCSigO. SigC
Hist of Opns Br, 1942. vast expanse of the China-Burma-India
113
(1) Memo, Maj N. C. Miller for Plan Div, theater (CBI), much greater in size than
28 Apr 43, sub: Persian Gulf 700-mile wire line
project. SigC 319.1 Daily Rpt, All Secs Office Plan
the whole United States and cut apart by
Dir. Jan-Jun 43. (2) T. H. Vail Motter, The Per-
114
sian Corridor and Aid to Russia, UNITED Jackson, Communications in the Persian Gulf
STATES ARMY IN WORLD WAR II (Wash- Command, p. 4.
115
ington, 1952), p. 256. Gere Rpt cited n. 110.
GLOBAL COMMUNICATIONS 461
enemy occupation and a barrier of lofty Corps requisitions late in 1942 and another
mountains. As originally set up in the spring 279 during 1943. Over half the requests
of 1942, the theater consisted of India, the were for poles, crossarms, and pole line
extreme northern tip of Burma, and the in- hardware. Local facilities for manufactur-
terior portion of free China. The Japanese ing most types of communications equip-
held practically the entire coastal region al- ment were wretched, and the aggressiveness
most to Calcutta, thus controlling both of the British and Russian delegation often
water and land routes into China. The air resulted in exceedingly low priorities on
provided the only path of supply to the Chi- American equipment for the Chinese
nese allies. And what a path it was, from Army.117
upper Assam in India over the wild Hima- In areas of China where poles were
laya Mountain system. Communication in- scarce, linemen strung excessive quantities
stallations and installation practices re- of field wire onto the crossarms, thirty pairs
flected the bleak supply outlook and the to an arm. Insulators, patterned after the
strange and unusual local conditions. They standard IN-53, were made of uncured
also reflected, more brightly, the stamina, wood; then they were immersed in oil to re-
ingenuity, and skill of the men responsible duce moisture absorption, and the knobs
for the communications networks. The men were insulated with tape at critical points.
caricatured the CBI initial letters as "Con- Lines laid in the early months combined
fusion Beyond Imagination." But they none- lengths of iron wire, bare copper wire, and
theless carried out their mission with Ameri- field wire. Terminal strips and distribution
can ingenuity and drive. General Marshall boxes were improvised from scrap lumber
had promised an increase in the effective- and parts salvaged from wrecked aircraft.
ness of the air ferry 116 which meant that There were times when overhead-type cable
airways, airways communications installa- had to be used for underground installations
tions, administrative radio systems, wire because it was all the men had, and times,
systems, and aircraft warning systems would too, when underground cable had to be
all be extended in the CBI theater. The strung wastefully on poles for the same rea-
story of the extension of these networks is son. Transportation of supplies was by any
a story of improvisation and of individual means available: planes or barges, para-
Signal Corps men who made up the thea- chutes or donkeys, barefoot porters, camels,
ter's few signal units. elephants.118
For a long time the CBI theater pos-
117
sessed the barest minimum communications (1) Lt Col William H. Knowles, Jr., Air
Corps, Air Force Communications, China-Burma-
needed to support air activities. Signal India Theater, June, July, August, 1943. SigC
equipment consisted of little more than 676.3 Air Force Com CBI Theater. (2) Dr. Donald
items in the tables of basic allowance. O. Wagner, Army Command and Administrative
Network, 1941-1945: Pt. II, China-Burma-India
Lend-lease in reverse helped. British, Chi- (1945), SigC historical monograph E-6, p. 66. SigC
nese, and Indian authorities filled 36 Signal Hist Sec File.
118
(1) Historical Report of the 835th Signal Serv-
116
(1) Joseph W. Stilwell, The Stilwell Papers ice Battalion, April 1, 1943-October 31, 1944. Opns
(New York: William Sloane Associates, Inc., 1948), Rpts, SGBN-835-0.1 (28174). (2) "Elephants
arranged and edited by William R. White, p. 171. Boon to Signal Corps Soldiers in CBI," Camp
(2) Proceedings of Board To Investigate Commu- Crowder, Mo., The Message, No. 2 (November,
nications, Tab B (Testimony of Stilwell, May 43). 1944).
COMMUNICATIONS IN CBI depended frequently upon the initiative of individual
members of small Signal Corps units. From the swamps and plains of India (upper left and
right) to the rice paddies of China (below) wire lines were installed and maintained.
GLOBAL COMMUNICATIONS 463
In installing and maintaining pole lines, The 679th Signal Aircraft Warning Com-
signalmen found elephants useful both to pany (Visual) commanded by Capt. John
handle the poles and as elevated platforms G. Haury, also maintained a visual warning
from which to string the wire. They made network in the Patkai and Naga Hills over-
similar use of native canoes at high water looking Burma. Some of these stations, too,
during the monsoons. Their main job was were a several weeks' trek from civiliza-
to provide ACAN facilities, both small lo- tion, in the midst of tribes of heathen head-
cal stations and the two larger ones at New hunters, and in areas which British troops
Delhi and Karachi which communicated by entered only in military force. But the na-
means of medium-power Boehme equip- tives treated the small groups of American
ment with Brisbane and Asmara, respec- soldiers very kindly. Colonel King, who
tively, thus tying Africa, Asia, and Australia later became signal officer for CBI, attrib-
together and connecting with the circuits uted their friendliness to the foundation of
crossing the Pacific. And they did consid- good will that American missionaries had
erable AACS work also, not only installing laid.
airway radios but operating them too, be- In regions such as these, older types of
fore AACS units arrived. radar were impractical. Even the lightest
Another assignment that fell to the Sig- radar set, the SCR-602, weighed well over
nal Corps in CBI was aircraft warning duty 1,000 pounds and the only way it could
in Assam and Burma, serving the Tenth have been transported over the almost in-
Air Force. At first the duty was without visible trails would have been to break it
benefit of radar. Working as ground ob- down and have natives hand-carry the
servers and radiomen, the men signaled various parts. Even then, it would not have
sightings of Japanese aircraft. They served been effective because the advanced posi-
in groups of two or three, constituting a tions confronted hills, which would have
station outpost in the jungles, to which they prevented a radar sweep of the Chindwin
traveled elephant-back or where they were Valley. A test in these mountains of the
dropped from airplanes. There they stayed much heavier SCR-516, a medium-range
for months at a time, supplies being para- version of the SCR-268, proved disappoint-
chuted to them. Throughout free and occu- ing. The ponderous components, trans-
pied China native observers and radio sta- ported elephant-back after months of gruel-
tions were added to the irregular pattern. ing road-building labor, served only to give
Some of the stations used types of equip- radar a bad repute in these lands because
ment discarded in the early 1920's by ama- wide-beam long-wave sets were unsuitable
teurs in the United States as obsolete, but for use in such country. So many echoes
the results attained with them were incred- from the hills smeared the oscilloscope of
ible. Their alerts could be depended upon the SCR-516 that airplane reflections were
to give twenty to twenty-five minutes warn-
lost in the glow. Except for the radars in
ing of the approach of enemy aircraft. Some
the Assam Valley, the only others in the
200 spotter stations were scattered through
the Shan states, in the Delta country, and theater were four SCR-270-B's which the
in the upper Salween River region.
119 675th Signal Aircraft Warning Company
119 (Radar) operated in connection with the
Interv, SigC Hist Sec with Col King, Ret.,
Washington, 11 Oct 49. British fighter net around Calcutta.
464 THE SIGNAL CORPS
Airborne IFF equipment, transponders, moved up to Ledo, a small town in the
had been flown in and installed on air- jungle at the foot of the Naga Hills, the
planes in the area. But the transponders headquarters of SOS CBI Base Section No.
were useless because there were no ground 3. The British had made a start and Gen-
IFF sets, interrogator-responsors, to chal- eral Stilwell had taken over the task of
lenge the aircraft. Only one radar mainte- building a road from Ledo to Myitkyina
nance officer was known to be in the theater, which would connect with the Burma Road
1st Lt. John M. Edwards of the 1036th into China. Only 120 miles away from Ledo
Signal Company, 305th Service Group, at lay Burma and the Hukawng Valley, held
Ondal. The quality of third and fourth by the Japanese. But the intervening terrain
echelon maintenance varied from one de- was such that Merrill's Marauders spent
pot to another, depending upon the re- seven days hacking their way through three
sourcefulness of the men who made the re- miles of it to reach the enemy's flank. Soon
pairs without the spare parts that were the team established its radio station and
needed and often with ancient tools which waited for supplies for the pole line, which
no technician in the United States would would parallel the road. Although the radio
touch. Electronic equipment was often un- station they set up was a simple one, install-
accompanied by instructional literature be- ing it was no simple matter. The transmit-
cause its "secret" label so limited its dis- ter and receiver positions perched on ledges
tribution that even the men who needed it of the hills, which rose in steep steps and
were unable to get it.120 which were reached only by jungle trails.
The veteran signal unit of CBI was the Couriers ran the messages back and forth
835th Signal Company, teams and detach- between "Radio Hill" and the message cen-
ments of which performed all manner of ter established in a bamboo basha, or native
ACAN radio, wire, aircraft warning, and hut, near the headquarters of Base Section
AACS duties from one end of the sprawling No. 3. Each piece of equipment had to be
theater to the other.121 As the Allies sought laboriously hand-carried up these rough
to open up a land route into China, the trails; then the station had to be supplied
122
Ledo Road, early in 1943, a detachment of the same way.
the company, Team 6, provided communi- All equipment was extremely scarce at
cations. Two officers and 71 enlisted men Radio Hill. Spare parts were unobtainable
and power units a prize item. When a new
120
(1) Knowles, Air Force Communications, one-kilowatt transmitter was expected by
China-Burma-India Theater. (2) "AW Adven-
ture," Radar, No. 11 (September, 1945), pp. 14- the men at the station, they sent a repairman
17. SigC Hist Sec File, A46-160, Drawer 31. Four to the distant port to conduct it safely
SCR-602's arrived in Dinjan, Assam Province, in
July 1943. They too were useless in the hills but through the hazards of an Indian railway
123
could be, and were, used in the more open Assam trip.
Valley. In addition to keeping the radio channels
121
By July 1943 the 835th Signal Service Com-
pany, grown to a battalion, numbered over a thou- 122
sand officers and men. Other Signal Corps units in John and Ward Hawkins, History of the 835th
CBI at that time included over 1,500 men serving Signal Service Battalion, 1942-1945, pp. 25-26.
the Air Forces and about 500 serving SOS. Wag- SigC 123
Hist Sec File, A47-200, Drawer 15.
ner, Army Command and Administrative Network, (1) Ibid., p. 41. (2) Dodds, History of Plant
Pt. II, p. 67. Engineering Agency, p. 20, cited n. 39 ( 2 ) .
GLOBAL COMMUNICATIONS 465
264-211 O - 78 - 31
466 THE SIGNAL CORPS
men, included two companies formerly as- line from New Delhi to Agra, and a tele-
signed to the Tenth Air Force—the 235th type and speech connection between Bar-
Signal Operations Company and the 861st rackpore and Ondal in the Calcutta area,
125
Signal Service Company. were among those in operation. In late
The battalion's detachments, widely dis- spring 1943 a carrier circuit for teletype was
persed, comprised nearly half of all the made available for ten hours a day between
Signal Corps men in CBI and the organiza- New Delhi and Calcutta. The growing
tion was as well known in China and India amount of Air Forces activity in the
as the old 51st Signal Battalion had been in Kharagpur and Chakulia area was met by
peacetime maneuvers in the United States. a carrier circuit between Calcutta and
It remained the signal operating unit for the Kharagpur which later was extended to
administrative systems of the entire theater, Chakulia.127 Other circuits terminated at
providing radio communication and main- Lahore, Bombay, Bangalore, Tinsukia,
taining telephone systems for administrative Jorhat, Kinjikhoa, Dinjan, Borhapjan,
headquarters from western India to China; Ramgarh, Peishiyi, and Chungking. The
at Karachi, Services of Supply Base Section telephone systems in China were probably
No. 1; at New Delhi, headquarters of Gen- as frustrating as anywhere on earth. Native
eral Stilwell's rear echelon and of the Tenth repairmen often sought to cure short circuits
Air Force; at Agra; at Bangalore; at Cha- in twisted pair wire by shoving a stick or
kulia; at Chabua, take-off for the route rock between the conductors or by propping
over the Hump; at Gaya, headquarters of up sagging line with a bamboo pole, clothes-
the Air Service Command; at Barrackpore, line fashion. Thus a call over the local lines
headquarters of the India Air Task Force; was something of a gamble; the connection
at Calcutta, Services of Supply Base Section might be completed or not and, if com-
No. 2; at Ledo, Services of Supply Base Sec- pleted, the caller might or might not
tion No. 3; at Kunming, headquarters of be able to hear well enough to carry on a
the Kunming Area Command; and at conversation.
Chungking, the forward echelon of the By early summer of 1943, in addition to
126
United States Army Forces in CBI. the units with the Air Forces and the 835th,
Wire circuits thinly penetrated the same the CBI theater had a radio intelligence
areas. Two long distance circuits, a teletype company, the 955th, and a few V-mail de-
tachments. Radio traffic was growing heav-
125
(1) Maj L. P. Jacobs, Report of Activities, ier and operations were becoming more
Theaters Section, 31 Dec 42; (2) Col G. L. Town- interwoven.128 For one thing, the increasing
send, Report of Activities Theaters Section, 19 Nov
42. SigC 319.1 Diary Theaters Sec, Apr-Dec 42. complexity of the radio nets, coupled with
(3) Activities of the Directorate of Planning, 31 the necessity for frustrating enemy recep-
Dec 42. SigC 319.1 OD-1 Daily Rpt. (4) Memo,
127
Lt Col G. F. Moynahan, War Plans Br, for Prog and (1) Wagner, Army Command and Adminis-
Statistics Br, 11 Mar 43, sub: Rpt of prog and prob- trative Network, Pt. II, pp. 78-79. (2) Hawkins,
lems, p. 2. Digest of Prog, 11 Feb-10 Mar 43. SigC History of the 835th Signal Service Battalion, p. 35.
128
Central Files. Hawkins, History of the 835th Signal Service
126
(1) Hawkins, History of the 835th Signal Serv- Battalion, p. 67. The expansion of the air transport
ice Battalion, p. 29. (2) Wagner, Army Command center at Chabua, the India terminus of the airlift
and Administrative Network, Pt. II, pp. 67-68. (3) into China over the Hump, greatly increased ACAN
Signal Corps History of China-Burma-India Theater nets and traffic loads. Wagner, Army Command and
(1944), Ch. I, p. 1. OCMH. Administrative Network, pp. 76-77.
GLOBAL COMMUNICATIONS 467
tion intensified the importance and the dif- on to other subordinate networks in Aus-
ficulty of controlling and changing fre- tralia, New Guinea, and islands to the north.
quencies, which first had to be approved by By the early summer of 1943 eight com-
a board sitting at Washington and then by mand and administrative circuits radiated
the appropriate authorities of India. Thus from Brisbane: 10-kilowatt circuits to
problems wider in scope developed as the Honolulu and San Francisco, a 1-kilowatt
networks in that land became more effec- circuit to Noumea, 800-watt circuits to Ade-
tive, taking the place of the individual prob- laide River and Port Moresby, a 400-watt
lems which the early arrivals had met and general headquarters circuit to Townsville,
conquered through individual ingenuity. and 300-watt circuits to Townsville and
The globe-circling equatorial ACAN belt Sydney.129 Thus, as new conquests were
line came to earth at two points in India, at made, the Signal Corps spread its radio
Karachi and at New Delhi. In its next jump, and wire over widening areas, drawing out-
the belt line had first touched Australia at lying stations and subordinate networks into
Melbourne. But in mid-1942 station WVJJ, the flexible design of the administrative sys-
Brisbane, replaced Melbourne, WTJJ, as tem, which changed to accord with strategic
the hub of ACAN nets in Australia and the plans affecting island after island.
Southwest Pacific. Brisbane also became the Before the end of 1942 the administrative
terminus of the direct circuit from WAR, communications situation had altered
by way of San Francisco. It would remain a greatly in the Southwest Pacific. On the
key station until late in 1944 when the focus Brisbane-Sydney-Noumea net, Sydney had
of military activity shifted farther north. become merely a stand-by station; little
Before the Papua Campaign late in 1942, traffic went there and that little by way of
Brisbane traffic had averaged only between Brisbane. The 832d Signal Service Com-
80,000 and 100,000 groups a day. Even so, pany, organized from the various radio
the circuits had been so overloaded that teams and base communications detach-
traffic classified as routine and deferred had ments in the theater, with headquarters at
to be sent by officer couriers. The work load Sydney, was already operating the commu-
grew as the campaign progressed. Then, in nications facilities at the advance base on
February 1943, the pressure was somewhat New Guinea. Signal Corps men had gone
relieved when the Army's single side-band into both Darwin and Port Moresby to set
multichannel sets became available on the up the hubs of outreaching subordinate net-
Brisbane-San Francisco link. Traffic volume works before the main bodies of combat
rose to 250,000 groups a day, 80 to 85 per- troops arrived.
cent of it administrative business. In the rear areas, Base Section 5 at Ade-
In March ACAN established an emer- laide and Section 6 at Perth had practically
gency link, Brisbane to Karachi, and re- been closed. Section 4 at Melbourne was
placed it a month later by a Brisbane-New
129
Delhi channel. Soon 40- ( 1 ) W a g n e r , Army Command and Adminis-
kilowatt equipment
trative Network, pp. 27-28, including chart, Army
at Brisbane strengthened the links with the Administrative Radio System, South Pacific, 16
United States and with India. Belt line traf- Feb 43, rev. 7 Jun 43. (2) Memo, Col Treest, Dir
fic from the West and the East passed of ACD, for Control Div, 22 Mar 43, sub: Digest
of prog and problems, p. 1. SigC AC 319.1 Digest,
through this main Australian terminal and 30 Jul 42-1 Dec 44.
468 THE SIGNAL CORPS
dwindling although it would be retained be- Island Hopping Networks in the South
cause of the importance of the civilian agen- Pacific
cies there. At Sydney, the 832d maintained
the radio, teletype, and telephone facilities Island hopping in the Pacific placed new
for the Services of Supply headquarters and burdens on Army communications. When
for Base Section 7. At General Headquar- the military objective was a dot of land sep-
ters and Base Section 3 in Brisbane, the arated from other dots by vast expanses of
company was responsible for the large radio water, the first communications need when
installations, including the construction and an island objective had been won was a
maintenance of the intercept station under command channel to another island base.
General Headquarters and the radio sta- Obviously point-to-point radio was the
tions working the United States, New Cale- only quick solution. Then, after the Army
captured an island, the men had to make it
donia, and Hawaii, and for the telephone
a base for operations against the next en-
and teletype facilities required by headquar-
emy outpost. Any base requires an extensive
ters and base as well. That section controlled wire system, in addition to radio channels,
one of the most important ports and the and the need for these wire networks had
majority of the general depots, as well as the not been anticipated to the extent that ra-
staging areas for the I Corps and the 32d dio had. Colonel Ankenbrandt remarked
and 41st Divisions supporting the Australian early in 1943 that the War Department ap-
forces. The company's radiomen also op- parently had "the impression that the South
erated and maintained floating radio sta- Pacific Area was a bunch of little tiny is-
tions used by task forces. In December 1942 lands requiring no particular long wire
one such vessel was anchored at Port lines; just put up a field switchboard, string
Moresby, another was at sea. The Buna a few locals, and there you are." 131 Instead,
area, as soon as a supply base was set up in some island bases, lines hundreds of miles
there, needed signalmen, and the officers long had to be built, generally over path-
and men for these details came from the less mountain and jungle terrain.
832d Signal Service Company also.130 Communications in the Pacific isles thus
fell into three phases: assault, consolidation,
Other units meanwhile extended and im-
and development. Assault communications
proved military wire lines in Australia and
were the responsibility of communications
in New Guinea. By planning and improvi-
units serving with the combat troops. The-
sation, under the spur of necessity, commu-
ater signal officers were therefore concerned
nications men pushed wire lines through
primarily with communications in the two
the sodden, mud wastes of New Guinea in
latter phases. As soon as a tactical com-
the rainy season, through the heavy jungles
mander declared an island secure and free
which stood like solid walls along the water-
of organized enemy resistance, control
courses—all in the short space of days and
passed to the island commander for con-
weeks and months instead of years.
solidation and development. During the sec-
130
Memo, Col Grable, OCSigO USASOS SWPA, 131
to O/C War Planning Br OCSigO, 5 Dec 42. SigC Ltr, Ankenbrandt to "Duke" (Col Lanahan),
AC 333.1 Inspec Trip to South and Southwest 6 Feb 43, p. 5. SCIA File 8, Ankenbrandt-Newhouse
Pacific Areas, Maj Wharton, 1942. Rpts, 1.
WIRE LINES IN NEW GUINEA. Signal wire men repair a line across a stream (above)
and hack their way through thick jungle to install a new line (below).
470 THE SIGNAL CORPS
ally. When they could not clear traffic auto- establish the first ACAN nets in those quar-
matically, they "dumped" it on Brisbane ters of the Southern Hemisphere.143 Mean-
for manual relay to Noumea, thus delay- while officers in the field had learned to
ing the messages and creating a larger mar- modify their demands, and inexperienced
gin for error.142 In the early summer of 1943 technicians had trained themselves in the
an additional 1-kilowatt transmitter was in- use of the equipment they had at hand and
stalled at Noumea to provide an extra tac- had accomplished more with it than either
tical channel between that point, Brisbane, they or anyone else had thought possible.
and Port Moresby. As more and more The installation of AACS stations in the
equipment began dribbling into the South South Pacific theater had been very slow,
Pacific theater, fixed Signal Corps facili- partly because there were so many factors
ties, including the new radioteletype, grad- not under the control of the Signal Corps.
ually replaced the mobile SCR-197's, 188's, The buildings, as in other places, were con-
299's, Navy radios, and old commercial structed by the Engineers from materials
sets which had been pressed into service to provided by the Services of Supply in the
142
area. Like other service troops, the Engi-
(1) Memo, Ankenbrandt, 29 Oct 42. SigC AC
333.1 Inspec Trip to South and Southwest Pacific
neers available were few. It was impossible
Areas. (2) Ltrs, Ankenbrandt to Lanahan, 1 Apr
143
and 14 Apr 43. SCIA File 8, Ankenbrandt-Newhouse Ltrs, Ankenbrandt to Lanahan, 2 Feb,
Rpts 11.Apr,
and 5 Jun 43. File cited n. 142.
GLOBAL COMMUNICATIONS 475
for the Signal Corps to install equipment of the 270's on hand, including those sup-
with speed. A score of Army Airways Com- plied by the Navy and the Marine Corps,
munications System installations under way to provide aircraft warning service. New
in the 20th Region, AACS, were put up by Caledonia had three SCR-270's in opera-
a small group of officers and engineers tion and three SCR-271's on hand awaiting
loaned by the Hawaii Signal Office. the arrival of the 673d Aircraft Warning
It was the old story of compromise be- Company to install them. The Coast Artil-
tween the users who wanted the equipment lery was operating five SCR-268's along the
on the air at once and the radio engineers southeast coast of the island. Fiji had three
who wanted to do a thorough fixed installa- SCR-270's in place, with five SCR-271's
tion job, such as they had done in peace- on hand for installation by the 672d Air-
time. Early in 1943 the Signal Officer of the craft Warning Company when it should
South Pacific Command established a sec- arrive. On Espiritu Santo two reporting
tion in his headquarters to handle all AACS platoons of the 674th Aircraft Warning
communications, following the general de- Company were awaiting water transporta-
sires of the Air Transport Command, but tion for their two SCR-271's, the only
catering particularly to the needs of the local means of getting them to their sites. So it
cargo planes engaged in moving emergency was at other points.145
supplies and evacuating the wounded. Sta- Radio and radar needs in the South Pa-
tions were then in operation on Guadal- cific had been at least partially anticipated.
canal, Espiritu Santo, Efate and at Plaines But wire nets had not. Telephone construc-
des Gaiacs, Tontouta, and Nandi. Other tion slowed almost to a standstill during the
Pacific stations, controlled directly out of winter of 1942-43 for want of switchboards,
Hawaii, were operating at Samoa, Aitutaki field wire, open wire, insulators, construc-
(Cook Islands), Bora-Bora (Society Is- tion troops, teletype machines—practically
lands ), and Penrhyn (Tongareva), most of everything needed for telephone systems.
them using makeshift equipment. Grad- Colonel Ankenbrandt said in February
ually, however, the improvised facilities on 1943: "Circuits do not exist and my guess
the AACS network were replaced with is they will not for six more months." He
standard fixed radios and navigational aids borrowed from the Navy and the Marine
such as homing stations, radio ranges, radar Corps in an attempt to make wire ends meet.
beacons, control towers, and ground di- He managed also to get 1,000 miles of heavy
rection-finding and instrument-landing field wire of Australian make, hard to handle
equipment.144 and hard to ship, but satisfactory once it
Radar equipment was on hand at most was installed. Even the full amounts of
of the air bases, but there were too few T/BA equipment seldom accompanied the
skilled crews to install it. The theater wanted signal troops who made the long journey
no more SCR-271's. An SCR-270 could down under from the United States. The
be installed in a week or ten days by the 905th Signal Company, Depot, Aviation,
operating company but it took months to for example, arrived without switchboards
put a 271 on the air, and there were enough or teletypewriters. The theater signal officer
144 145
Ltrs, Ankenbrandt to Lanahan, 2 Feb and 1 Ltr, Ankenbrandt to Lanahan, 3 Mar 43. File
Apr 43. File cited n. 142. cited n. 142.
476 THE SIGNAL CORPS
148
pleaded: "Surely production is increasing canal, Espiritu Santo, and Efate. It was
all the time and you should be able to meet April, however, before the first repair kit
some of these requests, at least partially, and two trained repairmen arrived to serv-
soon." Even more than wire equipment, ice the sixteen cipher machines employed at
Colonel Ankenbrandt needed wire-con- message centers on the various islands in
struction units.146 order to supplement the strip cipher systems
The fact that he himself, during the pre- and M-209 equipment.149 Meanwhile cryp-
liminary planning at Washington, had tographic officers arrived from Washington
shared the common view that wire com- to supervise code activities and to serve as
munication would be relatively unimportant itinerant inspectors and instructors in code
on the island bases did not ease his anguish. procedures, thus further improving the sit-
On Fiji the division signal company organ- uation.
ized a provisional construction unit out of By spring 1943 the administrative radio
tactical troops and set the men to building net had been rearranged to serve existing
a pole line to connect Suva and Nandi. needs and to provide for extensions to the
Defense strategy called for the defense of north. The Suva-Hawaii channel was dis-
the harbor at Lautoka and added another continued except as a stand-by, after an
area to the list of places desperately needing analysis of the traffic revealed that only
wire networks. It would have been easier about 1 percent of the messages it carried
to build the Suva-Nandi line along the road, were addressed to Hawaii. Over one third
paralleling the commercial line, but Signal were relayed back to Noumea. By discon-
Corps officers chose a more difficult inland tinuing this channel and establishing point-
route, half the length, in order to conserve to-point links from Suva to Noumea and
the small stock of wire and protect the line Noumea to Auckland, it became possible to
should the enemy land along the coast. On cut down the traffic on the air and to operate
Guadalcanal nearly 1,000 miles of open the main network much more efficiently.
wire had been unloaded by the end of Aitutaki and Penrhyn were then linked to
February 1943 and Signal Corps men be- Suva. A channel from Guadalcanal reached
gan construction on a tenpin crossarm line out to the 43d Division, which had landed
from Koli Point to Lunga. A similar line was on the Russell Islands late in February.
147
still needed on Espiritu Santo. Traffic to Tongatabu and Bora Bora in the
In February 1943 Ankenbrandt painted South Pacific continued to pass over the
a dark picture of the wire situation and of Navy's circuits.150 Equipment was on hand
the code situation, too. But about radio he for a semifixed station on Guadalcanal and
was more hopeful. To improve the code the station was expected to be in operation
situation he and his Navy colleagues took a by the end of April. Although the Japanese
few risks frowned on by Washington. They were still bombing the island occasionally,
placed cipher machines in the forward the strategical outlook there was so bright
areas—with appropriate safeguards—and that Ankenbrandt decided against dugouts
brought about at least a 200-percent im- to house the equipment. "Camouflage and a
provement in communication with Guadal-
148
Ltr, Ankenbrandt to Lanahan, 6 Feb 43.
146 149
Ltr, Ankenbrandt to Lanahan, 6 Feb 43. Ltr, Ankenbrandt to Lanahan, 1 Apr 43.
147 150
Ltr, Ankenbrandt to Lanahan, 3 Mar 43. Ibid.
GLOBAL COMMUNICATIONS 477
few sand bags," he felt, would do just as and nets. The radio intelligence platoon was
much good, "except in the case of a direct formed from men of the radio and telephone
hit, then nothing would be any good." 151 sections of the company who had had no
Meanwhile, as plans for projecting fixed previous training in that work. They had
ACAN systems into newly occupied islands three obsolete SCR-206-A direction-find-
took form, tactical signal troops were mov- ing receivers, but no plotting boards or other
ing forward with the advancing XIV Corps. equipment usually associated with an in-
The corps had no organic service troops, telligence company. An infantry officer,
and Col. Evan D. Cameron, the corps signal well grounded in radio engineering, took
officer, used detachments from the 26th Sig- over the training of the unit and, by check-
nal Company of the Americal Division and ing its data with a Navy direction-finding
from the 25th Signal Company of the 25th station equipped with an Adcock DF, he
Infantry Division in order to establish head- was able to provide at least the direction-
quarters communications until other troops finding aspect of Radio Intelligence duties.
should arrive.152 In December and January the aircraft
The 26th Signal Company under the warning system consisted of two SCR-270's
command of Lt. Col. Robert B. H. Rock- located south of Henderson Field, Radar 1
well had landed on Guadalcanal in Decem- and 2 operated by the Marine Air Wing,
ber 1942 with the Americal Division and and one located at Koli Point operated by
had taken over communications from the Marine antiaircraft forces. The marines
marines.153 The wire lines serving the divi- had laid a telephone circuit from Koli Point
sion headquarters extended also to naval to Radar 2 and shared with the 26th the
headquarters, to naval construction and duty of maintaining the line. The Ilu River
service units, to Marine service units, to served as a convenient dividing line to ap-
other Army service units in the area, and to portion responsibility between the two serv-
Air Forces units. The initial radio installa- ices. The 26th laid the circuit between
tions consisted of a message center in the Radars 1 and 2 at Henderson Field and
trailer of an SCR-197-C at Americal Divi- wing operations. The Australians operated
sion headquarters, with machine cipher
valuable coast-watching stations on Guadal-
equipment. The transmitter was housed in 154
canal and on other nearby islands.
a truck located nearby, both installations
being set against the south side of a steep
Following the 26th in a few days, the
ridge. They were well camouflaged by trees 25th Signal Company, with the 25th Infan-
try Division, filled to strength in Hawaii
151
Ibid. from other units and supplied with such
152
Lt Col M. P. Chadwick, Experiences with Sig-
nal Communications on Guadalcanal. Southwest T/BA equipment as the Hawaiian Signal
Pacific Folder, SigC Hist Sec File.
153
Officer could spare, landed on Guadalcanal
For caustic comments, attributed to General a week before Christmas to install wire cir-
Vandergrift, upon the communications and com-
munications equipment (Navy-Marine) during the 154
early stages of amphibious operations against Ltr, Col Rockwell, Sig Officer, Americal Div,
Guadalcanal, see Min of Meeting Held 4 Feb 43, to Sig Officer, 18 Apr 43, sub: Sig officer's rpt
attached to OCSigO R&W Action 2, Col Walters Guadalcanal Campaign period 2 Dec 42-3 Mar 43.
to Lanahan, 19 Feb 43, sub: Data secured from File cited n. 153. The marines were operating
593d Engr Amphibian Brigade. SCIA File 121, SCR-268's on the island as gun-laying sets with
Vandenberg Rpts. AAA guns.
478 THE SIGNAL CORPS
cuits and set up radio networks for the Neither civilian experience nor Army
attack on 10 January 1943. training in the United States, at its best or
The soldiers in the wire-construction pla- at its worst, had prepared men for main-
toons, having no carbines, were armed with taining communications under conditions
rifles, the drivers of their jeeps with Tommy such as these troops found on Guadalcanal
guns. Jeeps and trailers carried all the wire during 1942-43. In training camps they
they could hold. In the forward positions had griped at the rigors of basic training,
the signalmen, without bolos or machetes to but now they found that physical fitness
cut the trails, pulled the wire by hand was their greatest asset. Anything that had
through the mysterious and malevolent taught them endurance paid dividends as
jungle, moist and stifling with its stench they cleared the jungle or dug foxholes in
of vegetable decay. They strung wire on coral.
trees across miles of water-covered bog In January 1943 the 69th Signal Service
where the mud was too deep for a man on Company arrived to augment the Signal
foot and the water too shallow for a boat. forces on Guadalcanal, bringing with it a
But somehow they managed. Then, as fre- pigeon detachment. Lacking officers, the
quently happened, after the wires had been detachment acquired an infantry lieuten-
laboriously strung, the Engineers, opening ant to take command. The men established
roads, chewed them to pieces. Near the lofts for the birds on Guadalcanal and on
fighter strips, particularly, Japanese bombs Tulagi Island, about twenty miles to the
cut them up. Then the crews went out to north, and flew the birds back and forth
repair the lines, often under fire from snipers with fair success. Training the pigeons to
hidden in the dense undergrowth. At night fly from ships at sea to their lofts was more
the signalmen worked in the dark, by feel, difficult. Most of the pigeons on hand were
climbing trees to locate breaks in the lines, old birds, slow to learn new tricks, and there
using test telephones on each line in turn, is no record of their performance in com-
156
then circling about, trying to find both ends petition with electrical communications.
of a broken wire, sometimes working all Meanwhile Lieutenant Van Ness's unit of
night long without success. They coveted the old 162d Signal Photographic Company
one feature of the Japanese wire equipment had arrived on Guadalcanal to make its first
157
for their own—but only one—the bright combat pictures.
yellow color of the field wire which made Although the 69th did not land until 17
it visible in the dark, dank jungle, even at January 1943, the company nonetheless
155
night. saw considerable activity before Japanese
155
The enemy's telephones were noisy, 1938 mands. Therefore the change was not made.
models, always in need of repairs. Captured radio OCSigO R&W Action 1, Maj Gen H. C. Ingles to
equipment also consisted of 1938-39 models. The Chief of Traffic Opns Br, 11 Aug 44, sub: Sv msg
tubes were poorly made and microphonic, the in- to Rumbough. SigC File F. [Deputy CSigO File.]
156
sulating materials inferior. Chadwick, Experiences Historical Data 26th Signal Company, Solo-
with Signal Communications on Guadalcanal. mon Islands Campaign, Americal Division, 1943.
The Chief Signal Officer seriously considered Opns Rpts 300 Sig-0.2.
157
having Signal Corps wire colored, but to intro- Memo, Ankenbrandt, Answers to Question-
duce the additional process meant reducing deliv- naire for Pictorial Division, 29 Nov 42. SigC AC
eries to the extent of about 9,000 miles per month, 333.1 Inspec Trip to South and Southwest Pacific
at a time when deliveries were not meeting de- Areas.
GLOBAL COMMUNICATIONS 479
resistance collapsed on 9 February. It in- For such actions, the laconic credit line
stalled a tactical control telephone circuit the Signal Corps men received read some-
for the 2d Marine Air Wing at Henderson thing like this: "Rations, water, wire and
Field; helped the 26th to construct field tele- communications were brought forward
phone lines for the Americal Division; and promptly." 159 At the end of January a de-
augmented the communications of the 31st tachment of the 26th embarked for Cape
Bomber Squadron. Esperance to provide communications for
Finally, a detail of seven men stepped to 2d Battalion of the 132d Infantry whose
into a boat for the opposite, or southwest, mission was to attack the Japanese from the
side of the island, aiming, first, to establish rear. Other men of the company, who had
a radio station at Beaufort Bay which could been assisting the Australians in the opera-
transmit warnings of enemy ships and air- tion of an interisland aircraft warning and
craft detected by a radar already function- coast-watching net, returned to join the
ing there; and, second, to provide commu- organization in February, and on 19 Febru-
nications for the 132d Infantry, moving ary the 803d and 807th fixed-station radio
from Lavora Pass up the southwest coast detachments arrived to develop the perma-
toward Cape Esperance. nent network in the conquered area. Then
Arriving at Beaufort Bay on 26 January, the 26th prepared to withdraw to the Fiji
the detail split to accomplish its double mis- Islands, and on 6 March the first echelon
sion. One party installed the radio equip- landed on Viti Levu. Joining the 37th Sig-
ment, laid a telephone link to the radar sta- nal Company there, the men began estab-
tion, and established a channel with the lishing a communications system for the
radio station at Henderson Field. The Americal Division, also withdrawn from
second party, equipped with a portable Guadalcanal. The work was not heavy,
radio, continued on toward Lavora Pass, however, and training courses were set up,
about thirty miles up the coast. On the as much to occupy time as to develop
way, the man in charge fell ill with malaria. technicians.160
Learning of this from a native messenger, From Guadalcanal, other Signal Corps
the noncommissioned officer charged with
troops advanced to the Russell Islands. A
the new radio station at Beaufort Bay had
detachment of the 43d Signal Company and
no choice but to leave it in the care of the
one platoon of the 579th Signal Battalion
operators, who now worked as long as
thirty-five hours at a stretch. Traveling for went ashore with the first waves of the 43d
three days and nights on foot and in native Division. The Russell Islands were stra-
canoes, the sergeant joined the second tegically located between Guadalcanal and
party. Their boat was strafed by unidenti- New Georgia, the latter occupied by about
fied airplanes, but without casualties. The 15,000 enemy troops. Active enemy airfields,
radio was water-soaked, but repairable. naval bases, and troop concentrations
After patrols had cleared the beach of throughout the northern Solomons, New
enemy machine gun nests, the Signal Corps Britain, and New Ireland made antiaircraft
party went ashore, set up the radio and 159
maintained it.158 Operations of the 25th Infantry Division on
Guadalcanal, 17 Dec 42-5 Feb 43. Opns Rpts
158
History of the 69th Signal Company, Service 325-33.4 (2667) Sec. II, p. 31.
160
Group. AF Archives, SIG-69-HI, 1 Jan 43. (Also Historical Data, 26th Signal Company, Ameri-
SIG-1069-HI, 1 Apr 43, 5393-27.) cal Division, 1943.
480 THE SIGNAL CORPS
and shore defenses urgent in the Russells. of-sight transmission, which their very high
On the day of the landing, an hour before frequencies required. But because the
even the field kitchens were functioning, Navy's type TBY gave somewhat better re-
the Signal Corps men established telephone sults, Colonel Ankenbrandt was unwilling
communication to all major elements of completely to dismiss very high frequency
the landing force in order to augment air, radio for jungle operations.162
warning, and command radio, which had The long-range vehicular SCR-193 was
been available since the moment of land- best when put to use for air-to-ground and
ing. Five days later, the 579th Signal Com- regiment-division-corps communications.
pany, Radar, was in position on high ground Several sets had been installed in Engineer
on Pavuvu, the second objective of the oc- half-tracks. The SCR -511 fell a v
cupation. But radio silence precluded the dampness all too often, but when it could
operation of its radar until 6 March, when be kept in operation it was far better than
the Japanese launched their first air assault, other small portable radios. Infantry com-
inflicting damage to supply dumps and municators liked the SCR -245, es
buildings. Radio silence was lifted then and for spanning the frequencies between 2 and
the company began operating. Within a 6.5 megacycles. Nobody liked the SCR-284,
few days a Navy SCR-270 entered the which was neither light enough for the men
warning network, which thereafter regu- to carry with any ease nor rugged enough
larly picked up planes 80 to 90 miles away to be carried in jeeps. Further, its hand-
and frequently at distances of 140 to 150 cranked generator made such a noise that
miles. In all air attacks except the first the it invariably drew Japanese fire.163 Never-
troops were alerted in time to get fighter theless, some of the users considered this set
planes from Guadalcanal.161 highly dependable, if unpopular. Alto-
Guadalcanal imposed the first severe and gether, only a relatively small percentage of
extended testing of the Pacific's communi- the signal equipment was rendered useless
cations equipment. The sound-powered during the campaign, perhaps 20 percent
telephone and the familiar EE-8-A field at the point of greatest action. During the
telephone were excellent. The switchboard 10-25 January offensive a detachment of
BD-71 was too heavy; battalions needed the 175th Signal Repair Company, serving
something lighter like the old World War I with the 25th Signal Company, put seventy
BD-11. The assault wire was good but too radio sets in operating condition and re-
fragile and easily damaged. Dampness at- turned them to the users, usually within
tacked tremendous numbers of batteries, twenty-four hours.164
corroding the terminals and decomposing 162
the paper containers. The old-type walkie- Ltr, Sig Officer USAFISPA to CSigO, 15 Jan
43, sub: Tactical ground radio sets. Rpts, South
talkies, SCR-194 and 195, were a disap- Pacific Area, SigC Hist Sec File.
163
pointment. These radio sets gave poor re- (1) Hq XIV Corps, 3 Jun 43, Informal Rpt
on Combat Opns to CG, South Pacific, Sec. 1d,
sults because the jungle blocked the line- Communications, pp. 17-20. WDGS G-3 Guadal-
canal Opns 3.2.17. (2) Miller, Guadalcanal: The
161
(1) Hq 43d Inf Div, Report of Occupation of First Offensive, p. 317.
164
the Russell Islands, 8 June 1943. Southwest Pacific (1) Chadwick, Experiences with Signal Com-
Folder, SigC Hist Sec File. (2) Miller, Guadal- munications on Guadalcanal. (2) Hq USAFISPA
canal: The First Offensive, pp. 354-55. G-2 Info Bulletin 2, 11 Jan 43, sub: Observations,
GLOBAL COMMUNICATIONS 481
By February 1943 Colonel Ankenbrandt tioned here were undergoing the same ex-
was able to report that after a "very slow" periences and meeting them with the same
start (the italics are his) the Signal Corps fortitude. The remarks of Maj. Gen. J.
had done "a good job" for the Army troops Lawton Collins, commander of the 25th
in the South Pacific Area. He felt that the Infantry Division, concerning the perform-
Army was keeping up its end of the joint ance of the soldiers of the 25th Signal Com-
operation despite the Navy's obviously pany on Guadalcanal, could truthfully be
higher "standard of living." He listed the applied to many others: "Practically all of
six main categories of signal activity in the critiques of maneuvers that I have heard
the area in the order of their excellence, have damned the Signal people. We did
as follows: radio, units, codes, supply, per- not have that here, which is a tribute to the
sonnel, and telephone.165 A month later so Division Signal Company and the commu-
many complicating factors had arisen that nications personnel throughout the division.
he could no longer attempt to rate the ac- Personally, I don't believe that any men in
tivities comparatively, he wrote to Lana- the Division worked as hard as the signal-
han, but he thought that the theater was men, particularly the linesmen. I have al-
at least beginning to better a situation ways taken my hat off to them." 168
166
wherein it had been merely "getting by."
Finally, early in June 1943, he felt suffi-
Alaska and the Aleutians
ciently encouraged about the ACAN system
in his area to write: "Our Army Adminis- The South Pacific island approach to-
trative Net has shaken itself down opera- ward Japan had its counterpart in the
tionally . . . it is working very well indeed north, where the Signal Corps was provid-
in my opinion." He took particular satis- ing Army communications through the
faction in the fact that "several of the northwest reaches of the North American
Junior Navy Officers and Radiomen who mainland and outward into the Aleutian Is-
are familiar with our labors through the var- lands chain. All the military activity going
ious joint stations we are operating down on in the area had a twofold purpose: to
here have stated privately to us that our lay foundations for strong permanent Alas-
circuits are working better and more effi- kan defenses and to provide facilities for
ciently than their own!"167 American landings in the Aleutians to dis-
By now, in mid-1943, Signal Corps men lodge the Japanese entrenched there. To-
in the South and Southwest Pacific Areas, ward the first of these objectives, the Signal
and their communications equipment as Corps was devoting special effort to com-
well, had undergone the tests of jungle war- plete the telephone pole line which paral-
fare. Many Signal Corps units not men- leled the Alaska Military Highway (or Al-
168
Guadalcanal. Rpts, South Pacific Area, SigC Hist 25th Div After-Action Rpt. Operations of the
Sec File. 25th Infantry Division on Guadalcanal, 17 Decem-
165
Ltr, Ankenbrandt to Lanahan, 2 Feb 43. SCIA ber 1942-5 February 1943, p. 167. General Collins
File 8, Ankenbrandt-Newhouse Rpts 1. no doubt had in mind such maneuver reports as
166
Ltr, Ankenbrandt to Lanahan, 3 Mar 43. File those of 1939 and 1940 which indeed brought out
cited n. 165. the weaknesses in Signal Corps units and equip-
167
Ltr, Ankenbrandt to Lanahan, 5 Jun 43, p. 1. ment of those militarily emaciated prewar years.
File cited n. 165. Terrett, The Emergency, pp. 160, 176ff.
264-211 O - 78 - 32
482 THE SIGNAL CORPS
can, as it was popularly called) across the Plant Engineering Agency. Require-
Canada to the Alaskan subcontinent. ments for the pole line were superimposed
upon a mountain of communication equip-
Alcan Highway Pole Line ment needs for other areas, and it was very
difficult to force through the priority ratings
The telephone pole line project had got necessary to get material. Furthermore, the
off to a slow start. Building the line was not initial plans had failed to include electric
considered to be a tactical project and, in power supplies. The planners had assumed
any event, the Signal Corps had too few that the Corps of Engineers would provide
construction troops available to handle such them, but by February 1943 it was plain
an assignment.169 Therefore the Corps of that the Signal Corps would have to accept
Engineers had contracted with a civilian full responsibility. Trucks, too, had been al-
construction company to build the line on most impossible to get in adequate num-
a cost-plus-fixed-fee contract to be adminis- bers. On at least one item, the Signal Corps'
tered by the Engineers, with the Signal own procurement procedures had been at
Corps' Maj. Ora F. Roberts, as resident en- fault. In August 1942 all the requirements
gineer, to supervise the technical aspects of for crossarms and hardware had been filed
the work. The Signal Corps felt that this with the Philadelphia Signal Corps Pro-
arrangement left it without any effective curement District, with a request that the
method of enforcing its standards of work- entire job be turned over to the Graybar
manship and complained of unsatisfactory Electric Company, which possessed the nec-
progress and poor quality of work. The con- essary raw materials and could begin de-
struction company retorted that it was Sig- liveries within thirty days. In the course of
nal Corps changes in plans and specifica- placing the contract, the Office of the Chief
tions which accounted for much of the de- Signal Officer's Purchase Branch, anxious
lay, and that Signal Corps methods of pro- to spread the work, let the contract to six
curement had added excessive costs to the separate companies, including Graybar.
project.170 None of the other five had the necessary
It was certainly true that delivery of ma- material on hand. New orders had to be let,
terials was long-delayed, but not all the dif- and practically no pole line material was
ficulty was due to Signal Corps negligence. available by November, when it was to be
used.171
All the materials were purchased through
Thus amid a number of initial fumbles,
the Office of the Chief Signal Officer and
the pole line project got under way. The
169
(1) Capt Sidney L. Jackson, Stringing Wire line was built in three sections, each sub-
Toward Tokyo: A Brief History of the Alaska Mili- divided into smaller segments. The first 500-
tary Highway Telephone Line (1944), SigC his- mile section from Edmonton, Alberta, to
torical monograph E-l, p. 45. SigC Hist Sec File.
(2) See above, pp. 136ff. Dawson Creek, British Columbia, probably
170
(1) Ibid., pp. 68-72, 80-81. (2) Hist of ACS, offered the most difficulties. The adminis-
p. 233. (See Bibliographical Note.) (3) Ltr, Rob- trative pulling and hauling was still going
erts to Miller Construction Co., Inc., 19 Dec 42;
(4) Incl 8, Ltr, Miller Construction Co. to Rob- on, and the supply situation had not yet
erts, 12 Jan 43, with Ltr, Miller Construction Co. 171
to Col Henry, 15 Jan 43. SigC 676.1 Alaska Mili- (1) Hist of ACS, pp. 234-35. (2) Jackson,
tary Highway 1942-43. Stringing Wire Toward Tokyo, pp. 29-35.
GLOBAL COMMUNICATIONS 483
shaken down, when on 10 November 1942 the ice in the river and swept away the
the Office of the Chief Signal Officer in- bridge, and two days later a heavy snow-
formed Major Roberts that this first sec- storm further ensnared the men.
tion of the line must be finished by 1 De- All hands agreed to emergency measures:
cember. Some 400 miles of poles were set, the pole-setting crews would set only every
but they lacked crossarms. Almost no hard- other pole, and place crossarms on every
ware had yet arrived. The War Production second pole only. Instead of stringing wires
Board's disapproval of the amounts of cop- one and two, nine and ten, the men would
per necessary for all-copper wire had com- string wires three and four because of the
pelled substitution of copper-coated steel fewer transpositions required on the latter
wire. Since the substitute wire could not circuit. Special crews of American Tele-
provide the same long-distance transmission phone and Telegraph Company men from
characteristics, the builders had to provide the United States would string the wire,
more amplification, relocating the repeater and ten crews of ten men each from the
stations and placing them closer together. Canadian Bell System from Montreal would
Actually, though, none of these stations had be sent to reinforce them. Roberts asked
yet been built. The civilian contractor had Washington to send 100 miles of twisted-
the plans, but the lumber, though on order, pair copper wire to close the gaps where
was not yet delivered. poles were not set, and he obtained per-
In the next few days, everything went mission from the Northern Alberta Rail-
wrong, engendering one frantic emergency road to place this wire on its poles. It was
after another. A heavy snowstorm closed now 19 November; more than 500 circuit
the lumber mills, and no lumber for the re- miles of wire had to be strung, and there
peater stations could be obtained. But just remained but twelve days in which to do it.
then, the contractor received some Yaku- Then came another order from Washing-
tat huts, and started placing them at the re- ton: radio communication between Ed-
peater station sites. Washington flew tem- monton and Dawson Creek must also be
porary repeater equipment in by air, and activated by 1 December. That meant more
speeded special shipments of hardware by crews, more housing, more supplies, and
express. The Northern Electric Company more transportation. The whole route from
of Canada sent ten of its best men to install Edmonton to Dawson Creek became a
the repeater equipment in the Yakutat bloodless battlefield, with more than 500
huts. They were to be assisted by enlisted soldiers and civilians fighting local engage-
men assigned from the 843d Signal Service ments against time and the elements. Men
Battalion. But when the soldiers arrived drove three-ton trucks over half-frozen riv-
from Seattle on 17 November, there were ers and felt the ice dip and sway under
no quarters for them and hurried arrange- them. They floundered in five-foot snow-
ments had to be made to house them in drifts, drove cars over roads that were
Canadian barracks. Meanwhile, the con- sheets of glassy ice, put on crossarms and
tractor (the Miller Construction Company) strung wire by oil lamps, flashlights, and
continued to set poles. Then fifty of its automobile headlights in temperatures
workers were isolated north of Peace River thirty degrees below zero. They slept and
when a chinook (a warm wind) broke up ate when and where they got a chance. In
484 THE SIGNAL CORPS
the early hours of 1 December trouble shoot- pany had subcontracted to the Onan-Smith
ing crews were still at work along the pole Company the portion of the line between
line making emergency repairs and tests. Fairbanks and Watson Lake, and crews
Finally, at 1940, Washington time, a worked toward each other from each end
call came through from Dawson Creek to of the line. The work progressed slowly.
Edmonton and thence by commercial tele- By the last of January Colonel Henry,
phone systems to Washington. General Chief Engineer of the Army Communica-
Stoner in the Office of the Chief Signal tions Division in the Office of the Chief Sig-
Officer talked briefly to Col. Heath Twitch- nal Officer, who had been sent to Alaska
ell of the Corps of Engineers at Dawson as a trouble shooter, was warning that the
Creek. The deadline had been met. When only way to meet the deadline was to use
the conversation was completed, the line Signal Corps construction troops after all.
went dead, and stayed out for two days A Signal construction battalion to take over
while weary crews tried to put it in more approximately 300 miles of pole line con-
orthodox working order. As for radio com- struction would be necessary, he thought,
munication, it too met the deadline with and it would have to be on duty by 1
only a few hours to spare. The transmitting March.173 The 255th Signal Construction
equipment for the radio stations at Edmon- Company got the assignment, leaving San
ton and Dawson Creek had been delayed Francisco on 1 March. Since the 255th
in transit from Seattle. It arrived in the rail would arrive in Alaska somewhat behind
yards at Edmonton on the night of 30 No- Colonel Henry's schedule, 300 Engineer
vember. Signal Corps crews unloaded it troops were pressed into temporary duty to
and had it in operation in the stations by clear the right-of-way, dig holes, and place
172
the next morning. poles in the section between Whitehorse and
The telephone line so hurriedly "finished" Watson Lake, until the Corps of Engineers
to meet the deadline was but an impro- required their services.174
vised circuit. The real task lay ahead: first of There had been repeated delays in lo-
all to make it into a reliable telephone line, cating and building the repeater stations, a
and next to extend it through the wilder- responsibility of the Corps of Engineers.
ness to Fairbanks. The work lagged during On 5 March Colonel Henry reported that
the next three months. Civilian workers and only about half of the stations had been
the extra telephone company crews went built, and in these the floors would not be
home for Christmas—and stayed there. Of able to support the heavy load which the
the 500 men on hand 1 December, there equipment would impose. The equipment
were now only 150. The schedule called for and the crews to install it, provided by the
completing the line as far as Whitehorse, Western Electric Company, were due to
Yukon Territory, by 1 May. Correcting de- 173
(1) Memo, Henry for Stoner, 23 Jan 43, sub:
fects in the original line and pushing it 50 Telephone line, Alcan Highway; (2) Ltr, Henry
miles beyond Dawson Creek took until to Asst O/C ACS, 26 Feb 43, sub: Telephone line
along Alcan Highway. SigC 676.1 Alaska Military
the middle of February. The Miller Com- Highway 1942-43.
174
Memo, Chief of Army Com Sv, OCSigO, for
172
(1) Hist of ACS, pp. 234-43. (2) Signal Prog and Stat Br, 2 Mar 43, sub: Digest of prog
Corps Technical Information Letter, No. 25 (De- and problems, p. 3, Item 2. Digest of Prog, 11 Feb
cember, 1943), pp. 23-24. 43-10 Mar 43. SigC Central Files.
GLOBAL COMMUNICATIONS 485
arrive the very next week (between 8 and 17 already it served a valuable military pur-
March). This was but one of many points pose : linking the headquarters of the North-
of disagreement which caused strained re- west Service Command directly with Wash-
lations between the Signal Corps and the ington.
Engineers on the Alcan project. Partial re- In early summer the contractors swung
lief came in the form of an agreement by northward in the final phase of work that
the Commanding General, Northwest Serv- would bring them into Fairbanks. The
ice Command, and the Officer in Charge, weather was favorable, daylight lasted 18
Army Communications Service, which al- to 23 hours, and the work progressed rap-
lowed the Signal Corps to deal directly with idly. The civilian workers bypassed one par-
the construction contractor on engineering ticularly bad fifty-mile stretch of line just
questions.175 east of the Canadian border, leaving it to
On 31 March Colonel Henry was forced a twenty-man detachment of the 255th Sig-
to tell the Chief Signal Officer that the com- nal Construction Company to string twisted-
pletion date of 1 May for permanent con- pair wire to close the gap. Engineers
struction could not be met, mainly because had graded the highway in that sec-
the repeater stations were not ready by the tion in the winter when the ground lay
dates promised. He urged that the comple- perpetually frozen beneath a protective two-
tion date for the pole line be advanced to 21 foot layer of muskeg. It had been possible
May.176 Already the enemy was changing to scrape away the muskeg, and grade the
from winter to the spring thaw which melted icy ground into an excellent road. But when
the frozen rivers and turned roads into the thaws began in the spring, the ground
quagmires. As soon as each repeater station that had been frozen for centuries thawed,
took form, crews of Western Electric men for it was no longer protected by an insu-
were waiting to swarm over it, installing the lating blanket of muskeg. The road became
repeater equipment. Civilian and soldier a bottomless bog over which no vehicle
crews set poles and strung wire. On 22 May could travel, and which sucked bulldozers
1943 a second call went through to Wash- down like quicksand. With two Indian
ington, this time from the chief of staff of the guides, twenty pack horses, and a supply of
K rations, the detachment of the 255th
Northwest Service Command in Whitehorse
started into the swamp. It took four weeks of
to the chief of staff for the Army Service
dirty, muddy, fatiguing work to put in that
Forces in Washington, and to General Olm- section of the line. By the middle of October
stead.177 The line was not yet complete, but 1943 the whole job was finished—more than
175
(1) Memo, Henry for Col Strong, 5 Mar 43,
2,000 miles of gleaming copper wire stretch-
sub: Const of repeater stations for telephone line ing across the Canadian and Alaskan wil-
on Alcan Highway. SigC 676.1 Alaska Military derness, a vital link in the westward
Highway 1942-43. (2) Jackson, Stringing Wire
Toward Tokyo, p. 68. movement of the war.
176
Memo, Henry for Dir of Army Com Div The telephone system served three pur-
OCSigO, 31 Mar 43, sub: Com facilities, Alcan
Highway. SigC 676.1 Alaska Military Highway
poses : (1) it provided a direct and secure
1942-43. line of communications between the United
177
Memo, Chief of Sig Operating Sv, for Olm- States and the armed forces in Alaska; (2)
stead, 20 May 43, sub: Wire com along Alcan
Highway. File cited n. 176. it provided telephone and teletype commu-
486 THE SIGNAL CORPS
nications between the principal military tween Seward and Whittier, traversing two
airfields and weather stations on the north- mountains. In June 1942 Signal Corps
west staging route, thus permitting up-to- crews had started work that continued
the-minute weather service and better throughout the winter. The drenching rain
control of air operations; and (3) it per- of summer gave way to howling blizzards,
mitted direct and immediate communica- to temperatures hovering between 20° and
tions between various points along the 40° below zero, and to snow 6 to 14 feet
Alaska Highway and oil distribution pipe- deep. By January of 1943 circuits to Whit-
lines, thus facilitating administration and tier were complete. By July C carrier equip-
control of all operations in the Northwest ment between Anchorage and Fairbanks
Service Command.178 was put in service, giving the Army two
The Alaska Military Highway pole line voice channels and twelve telegraph cir-
was not the only rugged telephone work cuits between Anchorage and Fairbanks.179
completed during the winter of 1942-43.
There was intense Army activity at Alaska Aleutian Action
Defense Command Headquarters at Fort
Richardson, Elmendorf Field at Anchorage, The first sizable American amphibious
the new air base being built at Ladd Field, operation in the North Pacific theater of
and Fort Raymond which was under con- war was known merely as the "Umnak Dis-
struction at Seward. Telephone and tele- persal." It involved occupying uninhabited
graph traffic in these areas overloaded exist- Adak and Atka Islands of the Andreanof
ing ACAN and Alaska Communication group in the Aleutians in order to prepare
Service facilities and called for new wire bases from which to strike at Japanese-held
lines. The one circuit of the Alaska Rail- Kiska and Attu.
road between Seward and Anchorage, and The Japanese had bombed Dutch Har-
between Anchorage and Fairbanks, would bor on 3 June 1942. By mid-July the first
obviously be unable to carry the load, even plans for the Umnak Dispersal were taking
if it were in perfect condition, which it was shape. On 23 August 1st Lt. Lauris S.
Parker at Fort Richardson was told to get
not. It had therefore been decided to re-
together enough radio equipment to set up
habilitate the whole line from Seward to
a small station, and to have it ready by noon,
Fairbanks, and to build a new line be-
25 August. On 26 August Parker and five
178
(1) Hist of ACS, p. 256. (2) ASF Control Div
of his ten men joined the motley fleet which
Rpt 175, The Alaska Highway, 1 Jun 45, pp. 45- was to comprise the landing force. Parker's
46. (3) Signal Corps Technical Information Letter, equipment, including a receiver, a trans-
No. 25 (December, 1943), pp. 25-27. mitter, a hand key, and antenna parts, was
Troops of the 258th Signal Construction Com-
pany, a Negro unit, arrived at Dawson Creek in stowed aboard an old four-masted fishing
April 1943, both in order to widen existing rights- schooner, the Sophie Christiansen. Four
of-way and repair and improve the telephone lines, days later the amphibious force anchored in
and in order to put in new stretches of line and
additional facilities along the Canadian section of Kulak Bay on the northeast side of Adak
the highway. The 258th was on duty in the area Island. Precariously far from a base of op-
until January 1944. Ltr, Capt Frederick N. Mose-
ley, CO 258th Sig Const Co, to CG ACS, 15 Feb erations, the task force had to have com-
44, sub: Hist records. SigC 000 Hist Diary, File
179
1—ACS, 1934-Dec 1943. Hist of ACS, Pt. Ill, "Anchorage," pp. 16-25.
GLOBAL COMMUNICATIONS 487
munications, and the Alaska Communica- early in October. Adak was slated to be the
tion System station, which it was Parker's net control station (NCS) for an inter
land is-
job to install, got third priority, preceded
only by an airfield and the installation of an Fort Glenn, and Amchitka. Stations on
SCR-270 radar for air warning. There were Attu, Kiska, and Shemya were to be added
181
of course no landing docks on Adak. The when those islands were occupied.
radio station equipment got roughly han- Atka Island, an hour's flying time to the
dled amid sea spray, rain, and sand, as it east of Adak, was not expected to become a
was loaded and unloaded several times be- major base, but with the decision to gar-
fore it could be set up. At first the men op- rison some troops there communications be-
erated only the receiver, copying Japanese, came a vital necessity. The Alaska Com-
Russian, and American signals. Radio munication System's 1st Lt. William E.
silence prevailed until 7 October, when the Morris received instructions to go to Fort
Japanese discovered the Adak landings. Glenn on 20 September to meet a ship
Thereupon the men switched on the trans- carrying materials for a new radio station
mitter and established Adak in the ACS on Atka. Atka was off the beaten Aleutian
network. From then on they never lost radio track, shunned by ships and airplanes alike.
contact with ACAN. This was particularly The ship which Morris was supposed to
important, because there were periods when meet never arrived. He "hitched-hiked"
all tactical nets in the area failed, including passage to Atka, but his Signal Corps sup-
the Aircraft Warning System, the Navy, plies and men were three weeks late. The
and the Eleventh Air Force nets.180 Quonset huts to house them, expected in
As more and more troops funneled into September 1942, finally arrived in May
Adak late in 1942, the ACS on the island 1943. In the meantime, by dint of almost
followed the usual pattern of development, superhuman effort, communication instal-
putting in better facilities and enlarging its lations went up. Of all the Aleutian bases,
activities. The men built a new and better Atka required relatively the greatest use of
station, put in a remote receiver station, human motive power. All the equipment,
started installing first a field telephone sys- material, and supplies had to be brought in
tem, and then permanent lines for the is- by manpower alone because the swampy
land, together with switchboard facilities tundra would not support motor transpor-
serving the air base, harbor, and other in- tation, not even the lightest of tractors. A
stallations. They also began work on a 100- man infantry unit hauled th
VHF direction-finding project, which power plants on skids up the hills to the op-
called for a fighter control center, equipped erations site, each man sinking ankle-deep
with receiver, transmitter, and homing at every step. There were no laundry fa-
direction-finding stations on Adak, Atka, cilities, no lumber to winterize the tents,
and Ogliuga. A temporary plane-to- and not even the proper kind of boots to
plane and ground-to-air AACS facility was protect the soldiers' feet from the soupy
in operation by early November 1942, with tundra. The 10-man crew of the radio sta-
a much more elaborate installation planned. tion nicknamed the place "Atkatraz," and
Cryptographic and censorship duties began referred to themselves as the "Atkatraz
180 181
Hist of ACS, Pt. III, "Adak," pp. 1-11. Ibid., pp. 13, 15, 28-31, 41-43.
488 THE SIGNAL CORPS
Rats." The Atka station joined the inter- permanent installations. By July the ACS
island net on 23 April 1943, relaying had sixty-six men and seven officers on
through Adak.182 Amchitka.
183
The Umnak Dispersal into the Andrea- With advance bases secure, the Western
nofs had shortened the distance between Defense Command and the Alaska Defense
American bombers and the Japanese. It was Command were ready for the first phase of
about 800 miles from Dutch Harbor and the assault upon the enemy garrisons on
Fort Glenn to Kiska. From Adak to Kiska Attu and Kiska. In March 1943 Col.
it was only about 350 miles. In January George L. Townsend, Signal Officer of the
1943 the next step, to Amchitka, brought Western Defense Command, had told the
the bombers even closer: just 66 miles away ACS that it must furnish three complete
from Kiska. radio stations and three "teams" to man
A task force went ashore on Amchitka on them. Each team would consist of an en-
12 January 1943. Japanese reconnaissance gineering officer, an operations officer, and
planes discovered the landing eleven days from five to twenty enlisted men serving as
later, and dropped their first bombs, where- engineers, radio operators, maintenance,
upon the task force commander broke radio men, cryptographers, and censors. Every
silence. Immediately the Amchitka radio piece of equipment had to be complete
transmitter went on the air and within down to the last bolt and nut, and every
twenty minutes established contact with man on the team had to know his job so
Adak. The Amchitka base was intended to thoroughly that he could perform it with
provide fighter and bomber facilities, and split-second timing and accuracy. The ACS
therefore one of the first demands upon the had the material, and it had excellent tech-
Signal Corps was for the installation of nicians, but its men lacked field experience.
modern and effective aerial navigation aids. Like other Signal Corps organizations it had
While the Signal Corps men of the ACS sent its technicians out to stations to perform
were still operating in tents in February desperately needed technical work, at the
1943, a construction crew under civilian expense of basic field training. Now, with
engineer Elwood Philbsen was siting the less than six weeks remaining before the first
radio range. Philbsen was to co-ordinate the tactical assignment began, the ACS worked
construction of facilities for aircraft warn- frantically to teach the men at least the
ing, for the AACS, and for associated rudiments of self-defense. At the same time
VHF installations. His installation crews it drilled them constantly on the technical
were mostly Air Forces men, with a leaven- details of the equipment.184
ing of soldiers and radio engineers from the Team A, fifteen enlisted men, led by 2d
ACS. Temporary systems were operating by Lts. William C. Greene and Lawrence W.
the end of April, and more elaborate per- Bucy, left the embarkation point at San
manent construction was well under way. Francisco for Attu on 24 April on board
Meanwhile, other Signal Corps crews had the transport Perida. On 11 May the assault
began. On 12 May the Perida, edging closer
strung a field wire and field telephone sys-
tem for the island, to be replaced later by 183
Hist of ACS, Pt. III, "Amchitka," pp. 1-17,
25, 27, 29-30.
182 184
Hist of ACS, Pt. III, "Atka," pp. 1-17. Hist of ACS, Pt. III, "Attu," pp. 2-3.
GLOBAL COMMUNICATIONS 489
to the rocky shores of Massacre Bay, positions near WXFR. When the attack
rammed a pinnacle of rock. Water gushed broke, the ACS men turned out with full
into the Number 1 hold where the Signal battle equipment to defend the station. The
Corps equipment was stowed. Pvt. G. I. Japanese were stopped about 500 yards
187
Counter, guarding the hold, rallied the sig- away.
nal team to save its equipment. Within fif- While the battle for Attu was in prog-
teen minutes, nineteen feet of oil and water ress, Team B (Capt. Richard Murray, 1st
had flooded the hold, but most of the sig- Lt. Donald Beyer, and sixteen technicians)
nal equipment had been dragged to safety was on its way to nearby Shemya. Actually,
on deck. On the morning of the 13th, half Team B had been slated for Attu, but an
of the team went ashore and picked out a error in code designators had sent them to
temporary station site, a half mile from the Shemya instead, leaving the rigors and com-
front and a short distance ahead of the bat of Attu to a team considered relatively
task force artillery. That afternoon the re- inexperienced.188 Team B was a well-or-
maining men brought the cryptographic ganized, well-equipped outfit, accompanied
material and packs ashore. With the bed- by eighteen tons of equipment packed
lam of a landing going on all about them, into three 6-ton caterpillar trailers. No one
amid the comforting boom of 105-mm. knew whether Shemya contained enemy
shells from two nearby batteries and dis- units. As it turned out, the landing was
comforting shellbursts and ricocheting bul- unopposed. Captain Murray and Lieuten-
lets from the enemy, the men set up their ant Beyer went ashore with the first units
station, dug in their operations tent, and on 2 June. The next morning the equip-
erected the antennas. As soon as the an- ment was unloaded, a site selected, and
tennas went up, they turned on the radio within four and a half hours, Shemya Sta-
to establish contact with Adak. But Adak tion WXFT was on the air and in contact
was not yet listening, supposing that Team with Attu and Adak. Shemya, only two
A was still on board ship in Adak Harbor. miles wide and four miles long, was slated
Finally, after sending a coded message to to become a large air base. This meant that,
Adak through Navy channels, contact was as on Adak and Amchitka, Signal Corps re-
made. Attu, Station WXFR, was on the sponsibilities for air warning, a VHF sys-
185
air. tem, and AACS installations would have
Of the three cipher machines which had very high priority. In addition, Shemya and
been assigned to the task force, only the Attu would be linked by ocean cable. There
one with the ACS unit got ashore and into would follow many telephone projects, and
operation promptly, the others being mis- finally a much-improved and permanent
directed in the landing.186 For five weeks radio station.189
the team handled all the cryptographic mes- Thus, by mid-1943 the Aleutian cam-
sages for the task force. The battle for the paign was entering the third and final phase.
island went on. On 29 May the Japanese There remained only bypassed Kiska to re-
counterattacked with the remnants of their claim. The members of the team training
force. During the night they had infiltrated
187
Ibid., p. 24.
185 188
Ibid., pp. 10-17. Hist of ACS, Pt. III, "Shemya," p. 1.
186 189
Ibid., p., 20. Ibid., pp. 7, 12-26.
490 THE SIGNAL CORPS
for the Kiska assignment did not yet know leave evidences of their labors and ingenu-
that when they landed on Kiska in August ity in the Caribbean bases, on small Ascen-
they would find an island abandoned by sion Island, across Africa and Iraq and
the enemy without a fight. But already the Iran, in China, Burma, and India, and
pattern was clear: Alaska was stronger than throughout the islands of the southern Pa-
ever before. A major contribution to that cific—and most of all in the European areas.
strength was the communications network But nowhere else would military communi-
which the Signal Corps had provided from cations systems be retained entire and in-
the Alcan pole line to the Aleutian radio tact, as they would remain in Alaska, not
nets. At war's end, the Alaskan circuits, only for Army use, but also, in the tradi-
probably to a greater extent than any other tion of the Alaska Communication System,
Army-installed networks in the design for for the use of the civilians of the territory,
global communications, would remain a providing them with such ready and far-
source of strength in the defense of the flung communication as they had not en-
United States. Signal Corps soldiers would joyed before.
CHAPTER XV
whenever one piece of equipment could be ters, and represented the War Department
made to do the work of two. Its engineers at the Interservice Radio Propagation
in all the research and development activi- Laboratory, on the Combined Communica-
ties worked unceasingly to effect standardi- tions Board, and on other important com-
zation and interchangeability of items of mittees. Obviously, the division's inter-
communications equipment. The Signal service and international duties made it, too,
Corps also constantly sought to extend an ardent advocate of standardization,
these aims through three of its agencies, simplicity, and interchangeability.
two of which included representatives of Nevertheless, in the final analysis, it was
other services: the Army Communications the using forces, not the Signal Corps, that
Board (until January 1943 called the Army decided whether a new item of communi-
Communications and Equipment Board), cations equipment was needed. When, for
the Signal Corps Technical Committee, and example, a commander in the Armored
the Communication Coordination Division. Force stated that he needed a radio set
The Army Communications Board, which would do certain things, it was
which technically was a supporting agency the job of the Signal Corps to provide
of G-4, in particular encouraged greater the item, whether it meant designing and
standardization among the using arms of producing a wholly new set, or merely alter-
Signal Corps-procured items, although un- ing and improving an existing model. Thus
til August 1943 it had no power to enforce research and development became in truth
its recommendations. The board was in the first phase of supply.2
reality a working committee, with the Chief Each new complexity or delicate re-
Signal Officer as chairman and with a finement introduced into a piece of signal
membership composed of representatives of equipment meant a loss of time in produc-
the Secretary of War, the AAF, the AGF, ing it. It meant new drawings, perhaps new
the Navy, the Marine Corps, and some of tools, a hunt for materials, for manufactur-
the Allied nations. ing facilities, for skilled workers. Always it
Representatives of using forces also at- involved a mass of paper work—new con-
tended the meetings of the Signal Corps tracts or change orders, letters, telegrams,
Technical Committee, which received data records, files, drawing numbers, standard-
and prepared military characteristics and ization procedures, catalogue listings, and
standardization actions for communications incorporation on tables of equipment, to
equipment. The SCTC also maintained name but a few. The thickening of the Sig-
liaison with comparable committees of the nal Corps catalogue bore testimony to the
other technical services, with the NDRC, increasing technical specialization of signal
and with other agencies inside and outside items. In World War I, the Signal Corps'
the War Department. entire equipment list totaled some 2,500
The Communication Coordination Divi- items, but more than 70,000 items appeared
sion supervised the assignment of radio in the catalogue at the end of June 1943.3
frequencies throughout the Army, compiled 2
Proceedings of a Board of Officers To Investigate
and assigned tactical and international call Communications, Exhibit P, Testimony of Gen
Olmstead, 24 May 43. AG 311 (10 May 43) (1)
signs for all Allied armed forces (except Army, RG 207.03, Job A50-55.
naval) operating in U. S.-controlled thea- 3
CSigO, Annual Report, 1943, p. 6.
THE TECHNICAL SERVICE A SUPPLY SERVICE 493
The emphasis on supply, both in quality we hadn't made a compromise, our military
and quantity, was producing an uninter- position . . . would not be as good as it is
rupted expansion, agency upon agency, now." He pointed out the handicaps under
place to place. All together, in the field alone which radar had had to operate: priority
there were 104 agencies by the end of June ratings as low as A-l-g, far below tanks and
1943 and 37 of these, more than a third, armament; insufficient allocations of alum-
were concerned in one way or another with inum, copper, meters, brass rod, and sel-
supply.4 syns; secrecy; and the difficulties of schedul-
All this is not to say that designing signal ing because of constantly changing demands
equipment to do a particular job and to in the tactical situation. The enthusiasm of
do it better was undesirable, but only the using forces and their demands, not
that it diverted time and attention from only for more, but for greatly improved
quantity production. The Army, the Air radars, had led to the setting up of pro-
Forces, and all the other users of signal duction schedules which could not possibly
equipment had a choice—they could ac- be met unless research, development, pro-
cept fairly standardized items which could curement, and production all proceeded
be produced quickly, or they could get cus- without any difficulties at all. Colton ob-
tom-designed items less quickly. served, "No production line can keep up
The point was well illustrated by the with the scribbling of a pen." 5
problems of producing radar equipment, as The conflict between technical speciali-
General Colton pointed out in his produc- zation and mass production constituted the
tion meeting in December 1942. Colton, a most important drag upon Signal Corps
top research man who was also the director
supply in early 1943. Unfortunately, it was
of the Signal Supply Service, was well quali-
not the most evident factor or the one most
fied to speak on the subject. If the Signal
readily understood and, in any event, little
Corps had been content to build radars on
a strict production basis, without incor- could be done about it. It was a matter not
porating new improvements and better de- easily reduced to terms of charts and sta-
signs, he said, there would have been plenty tistics. Other, more predictable problems,
of them. But the improved designs had in such as the manpower supply, received the
the long run been well worth the delay. major share of attention.
"Any time that we schedule . . . radar
equipment as if we were manufacturing The Shrinking Labor Market
nuts and bolts, it will mean that we have
In November 1942 a Signal Corps staff
stopped trying to get the very best that can
officer had warned that lack of manpower
be obtained, and ... if that attitude had
in manufacturing plants would constitute
been taken three years ago, in my opinion one of the biggest stumbling blocks to Sig-
several battles would have been lost. . . . nal Corps production in 1943.6 Retooling
If we had been satisfied with production, if
5
Supply Sv OCSigO, Review of Production
4
Dr. Courtney R. Hall, Development of the Of- Plans, 12 Dec 42, pp. 3-4, 17-19, 20, 25, 30.
6
fice of the Chief Signal Officer (1944), SigC his- Memo, Col Meade for Gen Colton. 29 Nov 42,
torical monograph D-1, Pt. I, p. 168. SigC Hist sub: SigC 1943 prod rqmts. SigC 400.192 Prod
Sec File. Control (Delayed Proc of Critical Radio and Re-
494 THE SIGNAL CORPS
264-211 O - 78 - 33
498 THE SIGNAL CORPS
for delivery of numbers of batteries within Capt. J. H. Rhudy set up offices in the
the defined limits, to be produced within Philadelphia Signal Depot, where numer-
a month's time. Since batteries are perish- ous other Signal Corps activities were
able, no great quantities could be made up housed, including the Philadelphia Signal
ahead of time. The effect was to treat the Corps Procurement District, which had
battery industry like a faucet, to be turned been handling labor problems through its
off or on at will and expected to gush forth Industrial Relations branch.
the product as needed. In peacetime, this Capt. Joseph M. Asbury and 2d Lt. Rob-
was not serious, because the battery com- ert Savage of the San Francisco labor office
panies could keep their production lines performed double duties, being also the Sig-
busy turning out batteries for civilian use nal Corps' west coast procurement officers.
at times when there were no military orders. It is more than 1,300 miles from Seattle to
Now, however, with civilian battery uses San Diego, and a swing around the area
drastically cut, with military requirements starting from San Francisco to the largest
rising to fantastic levels, and with the labor cities, Portland, Seattle, Spokane, Salt Lake
market drying up, the battery manufactur- City, Los Angeles, San Diego, and back to
ers faced great hardships. Halfway through San Francisco, would approach 4,000 miles,
the 1943 fiscal year the procurement of- without visiting Idaho, where the Signal
ficers discovered that there was a surplus of Corps secured telephone poles by the train-
certain types of batteries and immediately load, or Arizona, where many of its most
dropped the manufacturing calls to the strategic metals were mined.
minimum level for that year. The manu- In much of the region, and especially in
facturers would have been reduced to main- the northwest and along the waterfronts,
taining skeleton labor crews had not the the labor unions were exceptionally well or-
War Production Board saved them by al- ganized and powerful, while in Nevada and
lowing them to manufacture enough farm southern California there was little unioni-
radio batteries to take up the slack. Called zation. The electronics industry, very young
in to study the labor supply problem in the as industries go, was manned by even
industry, the Signal Corps labor officers younger men in the west coast region, and
saw that it could not be separated from the Selective Service was making fearful in-
procurement problem. Their successive re- roads. Labor officers, accustomed to calls
ports on the situation focused attention upon for help in getting deferments for electronic
it until procurement officers took the neces- employees, found themselves asked just as
sary action to correct it.22 often for help in deferring the boss himself.
The Philadelphia office served a smaller On the west coast the Signal Corps also had
area, but a particularly heavy concentration to face competition for labor and facilities
of Signal Corps suppliers lay in that region, from the huge shipbuilding and airplane
covering Pennsylvania, southern New Jer- industries, whose employees outnumbered
sey, Delaware, Maryland, and West Vir- those of the Signal Corps a thousand to one.
ginia. Lt. Col. Robert J. Walsh, Jr., and Activation of new military installations, and
22
the movements through the area of troops
Lt Col John M. Niehaus, Labor Supply and bound for the Pacific added to the conges-
Its Relation to Procurement, Conf SigC Labor Of-
ficers, 14 Jun 43. tion and to the problems of housing and
THE TECHNICAL SERVICE A SUPPLY SERVICE 499
transportation. By May 1943, with an in- female labor, few incentive plans for work-
flux of more than 100,000 workers monthly, ers, and not much attention to such things
the housing situation was desperate. La- as workers' cafeterias, adequate ventilation,
borers were sleeping in tents, trailers, sheds, sanitary conditions, and the like.
or any conceivable structure that had a roof. The Boston labor officers bent their efforts
The War Manpower Commission reported toward tactful suggestions along these lines.
that not a single city in the entire region By June they had visited 70 plants, per-
could be listed in Group IV (where labor suaded 14 different plant owners to provide
was plentiful and expected to continue so) 26 improved facilities, given advice to 31
and that 90 percent of all the cities in the companies, averted 1 strike, and settled 2
region were classified in Groups I and II others, rendered assistance in 11 War Labor
(where an acute shortage of labor existed or Board cases, delivered 15 talks to plant em-
would soon exist). Obviously, a labor crisis ployees and other groups, obtained 8 relax-
23
was approaching on the west coast. ations of federal and state labor laws, and
Boston, too, had regional problems, but completed 21 labor-supply and utilization
of a somewhat different nature. Lt. Col. surveys to assist the War Manpower Com-
Harry E. Olsen and Maj. Arthur Tager, mission. The Boston office had already
operating from an office in the Boston Sig- gained a measure of fame through a pro-
nal Depot, had all the New England states gram that later became known as the "Bris-
except Connecticut under their jurisdiction. tol Plan" and was widely copied throughout
All together, about 300,000 people worked the war. At Bristol, Rhode Island, the
for the Signal Corps in the region, in 500 United States Rubber Company, with a ca-
plants, ranging from small ones employing pacity of 12,000 miles of wire per month,
no more than two people to General Elec- was producing only 5,000 because it could
tric's 16,000-worker plant. A major part of not get enough workers. Bristol was a small
the Signal Corps' field and assault wire town, and the War Manpower Commission
came from twenty-one plants in this area, had stated flatly that no additional workers
and in addition there were rubber insulating could be obtained there, and the plant's
plants, mica mines and processing plants, personnel department agreed that the satu-
ration point had been reached. Neverthe-
and factories producing radio, radar, head-
less, the Signal Corps labor officers proposed
set switchboards, capacitors, fuses, wire
a community-wide program to the Rotary
communications equipment, storage bat- Club, which agreed to sponsor the project
teries, and crystals. These plants had to with speeches from pulpits, at civic clubs,
compete with the textile industry dominant and elsewhere in the community, urging
in New England. Business practices were citizens to "go to work for the rubber com-
conservative; over 50 percent of the Signal pany and help win the war." Within a
Corps plants lay in labor areas designated as month the 700 needed workers were ob-
Group I or II, yet there was very little use of tained, and many prominent people in the
23
community, who neither needed jobs nor
(1) Capt Joseph M. Asbury, A Labor Officer
on a Thousand Mile Front, Conf of SigC Labor
wanted them, went to work to keep the es-
24
Officers, 14 Jun 43. (2) Grossman, Industrial sential industry staffed.
Manpower Policies and Problems of the War
24
Department. (1) Heinz, Report of the Signal Corps Labor
500 THE SIGNAL CORPS
The New York office under Capt. James foreign aid program did not materialize as
C. Short had only the state of New York early as did that of other arms and services.
and the northern part of New Jersey under For one thing, although most nations classed
its jurisdiction, but that was enough. The signal equipment as "munitions," the
dollar value of Signal Corps contracts in United States did not. Furthermore, foreign
that area was so great, and the number of nations felt that their own electronic indus-
products so varied, that almost every con- tries were sufficient for their needs and spent
ceivable problem was sure to arise. their money in the United States on heavy
By the end of June 1943 the headquarters equipment. There were technical reasons,
agency and the field offices then organized finally: foreign frequency bands differed
had averted 41 threatened strikes, and had from those used by the United States, for-
helped to settle 37 others, had successfully eign operators were trained to use their own
processed 186 applications for wage in- equipment, and electronic components man-
creases through the regional War Labor ufactured in the United States were not
Boards, had made 667 visits to Signal Corps interchangeable with those of other coun-
war plants, and had delivered 173 morale tries.26
talks to employees. Nearly 650 companies An increased flow of technical informa-
had consulted them, and they had received tion between the United States and Great
131 letters of commendation and thanks Britain began after the exchange of military
from manufacturers, unions, and em- missions between the two countries. After
25
ployees. But production requirements were the passage of the Lend-Lease Act in March
still mounting, and the available labor sup- 1941, the Signal Corps became an active
ply was still shrinking. In the months ahead participant in the foreign-aid program, with
the Signal Corps labor officers would be a section in the Office of the Chief Signal
busier than ever. Officer staffed by two officers and four
civilians. By the summer of 1942, approxi-
International Aid mately 18 months later, this section had
become the International Aid Branch,
Meantime, another aspect of signal sup- staffed with 10 officers and 87 civilians. In
ply was beginning to compete with the pri- the first 13 months of operation, the Signal
mary effort to achieve mass supply of signal Corps' lend-lease organization had provided
equipment. Unlike most of the supply func- $33,500,000 worth of signal equipment, but
tions, the duty of furnishing lend-lease by October 1942 that amount was being
materials to the Allied nations had not been equaled every three and a half months.
decentralized, but remained in the Wash- Instead of shipments to three countries,
ington headquarters. In many ways, it was as at first, the list now stretched over five
a taxing and vexing duty. For several continents and embraced Liberia, Free
reasons, Signal Corps participation in the France, New Zealand, Australia, China,
Russia, Iran, Turkey, Greece, Yugoslavia,
Office, Pt. V, pp. 7-8. (2) Ltr, Maj Angus J. Czechoslovakia, Poland, Belgium, the Neth-
Walker, O/C ASF SigC Regional Labor Office, to
26
Dir of Legal Div OCSigO, 19 Sep 45, sub: Hist Andre E. Gerard, Activity and Participation
of Boston Regional Labor Office. SigC 004.06 of the Signal Corps in Foreign Procurement and
Labor-Boston. Lend-Lease (1944), SigC historical monograph
25
OCSigO, Annual Report, 1943, p. 100. B-5, Pt. I, p. 4, n. 7-A. SigC Hist Sec File.
THE TECHNICAL SERVICE A SUPPLY SERVICE 501
erlands, Norway, Great Britain, Iceland, work and considerable ingenuity, as in the
Canada, Mexico, Guatemala, El Salvador, case of an early request from the Chinese
Honduras, Nicaragua, Haiti, the Domini- for "800 gross tons of telephone equip-
can Republic, Venezuela, Colombia, Ecua- ment." Translated by the Signal Corps en-
dor, Brazil, Bolivia, Peru, Uruguay, and gineers, that meant a complete telephone
Chile. Not only the number of items, but system, along with a train-dispatching sys-
the quantities were impressive: 201,174 tem for the railroad being constructed from
telephones; 100,000 poles; 1,109 telegraph the Burma border to Kunming in the heart
30
sets; 51,205 radio sets of all types; and of Yunnan province. Nor could American
millions of bits and pieces, such as resistors, equipment simply be shipped from stock
condensers, relays, plugs, and jacks. The to- and expected to work satisfactorily. Nearly
tal of wire alone was 1,303,886 miles, always it had to be modified to meet the
enough to extend from the Pentagon to voltages and types of current in different
Tokyo 167 times. Russia had received more countries. It was usually designed for op-
than 1,500,000 radio tubes, and Great eration on 110 volts of alternating current
Britain another 3,500,000.27 But the quanti- at 60 cycles, but many countries had direct
ties of items and the dollar values reported current, or if they had alternating current,
did not reflect the complete value of Signal it operated on various voltages from 105
Corps equipment furnished to foreign na- to 250 and at various rates of cycles per sec-
31
tions, for no account was taken of the ond from 40 to 60. Climate introduced
countless communication devices installed another variable, as in the case of telephone
in airplanes, tanks, and other mobile equip- EE-8. Thousands of them had had to be
ment which were not included in Signal modified to accommodate the larger,
Corps International Aid transfer statistics. heavier, "non-freezing" battery that the
The value of the command radio set SCR- Russians used in the below-zero tempera-
274, for example, was $2,431; that of the tures of the winter front.
liaison set SCR -287 was $4,455; Modifying
and the equipment to meet special
altimeter SCR -518 needsAof
cost $1,607. foreign countries involved many
single
B-24 bomber carried nine items of commu- extra hours of engineering work. Often it
nication equipment valued all together at meant setting up new production lines or
28
$11,262. even new manufacturing facilities. On the
The Signal Corps did not make the pol- other side of the ledger, the Signal Corps
icy decisions that allocated equipment to benefited by receiving valuable informa-
various foreign nations, but it was respon- tion concerning equipment performance
sible for carrying them out insofar as they under battle conditions. Its laboratories
29
related to communication items. Often incorporated a number of improvements
this duty required a tremendous amount of brought about either by the special de-
27
mands of lend-lease nations or by technical
(1) CSigO, Annual Report, 1942, pp. 98, 101;
1943, pp. 276-77.
information they had supplied. Lend-lease,
28
Folder marked 1st and 2d Lend-Lease Air-
30
craft Programs. SigC 400 Lend Lease. (1) Memo for File, J. Ernest Hartz, PEA, 17
29
For discussion of lend-lease policy, see Leigh- Jul 45. SigC 461 Publications Gen 1, Mar 42.
ton and Coakley, Global Logistics and Strategy: (2) CSigO Annual Report, 1942, p. 99.
31
1940-1943, ch. X. CSigO, Annual Report, 1942, p. 104.
502 THE SIGNAL CORPS
as a matter of fact, was being regarded by plies in which such transactions were under
many military planners as the equivalent of way. They included 10,000 seventeen-foot
a large-scale supply maneuver in prepara- telephone poles; over 2,000,000 yards of
tion for our more active participation in the wire, with the necessary "bobbins, pins, and
war. A number of experimental and de- stays"; 800 special batteries; 800 miles of
velopmental models of signal equipment re- twisted cable; communication equipment
ceived from Great Britain through reverse for the deputy theater commander's special
lend-lease were turned over to the labora- train; 400 miles of permanent telephone line
tories. By the end of 1942 the Signal Corps for signal headquarters; equipment for a
had received from the Allies equipment photographic studio; 500 battery radios;
32
valued at $ 1,174,445.85. This included 975 long-wave radio receivers; quantities of
models of British and Canadian GCI walkie-talkies; 2,400 transformers; 84,000
sets, which indicated height as well as cartridge signals; and miscellaneous Signal
35
azimuth and which became the SCR— Corps equipment.
527 and SCR -588; the plan position When in- the invasion of North Africa was
dicator oscilloscope, which was being launched, lend-lease demands shot upward.
incorporated on later models of the270 SCR Large- quantitiesand of 271 radarswent
material as well as on newly
to the
French forces: more than $4,000,000 worth
designed radar equipment; and Askania in the first six months of 1943.36 The trans-
theodolites, which were more accurate than fer statistics reflected the tactical situation.
the American ones.33 Whether one chose to By the end of the fiscal year, the total of
regard the exchange as strictly reverse lend- material transferred to foreign governments
lease, or, as General Colton did, "a con- amounted to $139,298,701, an increase of
tribution between allies," the beneficial re- more than 400 percent over the preceding
sult was the same.34 fiscal year. For June alone material worth
Throughout the summer and fall of 1942, $19,249,230 was furnished.37 Until now,
the build-up of huge stockpiles of military lend-lease procurement had had little ad-
supplies in the European theater went on, verse effect upon Signal Corps procure-
and much of it was accomplished by means ment, but with foreign aid programs incor-
of reverse lend-lease procedure. The report porated into the Army Supply Program,
of the purchasing agent for SOS, European and with 38
demands rising, it began to pinch
Theater of Operations, U.S. Army, in Oc- a little.
tober showed 15 categories of signal sup-
The Shifting Emphasis in Procurement
32
Rpt of International Air Activities for 1942.
SigC 400, Role in Lend-Lease, Folder lid. The first six months of calendar year 1943
33
(1) OCSigO Engineering and Technical Sv, was a period of progress toward the Signal
History of the Signal Corps Research and Develop-
35
ment in World War II, Vol. II, "Introduction", Office Gen Purchasing Agent, London Echelon
5; Vol. IV, 1-2. SigC Hist Sec File. (2) SigC 400 SOS ETOUSA, Rpt on Status of Deals as of 1
R/L No. 30 W-4. (3) SigC 400 R/L No. 30 W-6. Oct 42. SigC 400 Lend-Lease (16-17).
34 36
Incl with OCSigO R&W Action 1, Colton to OCSigO, Annual Report, 1943, p. 277.
37
Chief of Spec Activities Br, 14 Jun 44, sub: Com- Ibid., p. 275.
38
ments on lend-lease, App. A, Activity and partic- Gerard, Activity and Participation of the Signal
ipation of the Signal Corps in Foreign Procure- Corps in Foreign Procurement and Lend-Lease,
ment and Lend-Lease, Pt. I. SigC Hist Sec File. Pt. I, p. 92, n. 19-A.
THE TECHNICAL SERVICE A SUPPLY SERVICE 503
LEND-LEASE TO THE FRENCH involved not only supplying the material but also
instructing our Allies in the use of our equipment.
Corps' goal of mass production, despite the more than a year's experience under the
factors tending to impede its accomplish- frustrations and limitations of wartime op-
ment. As spring wore on a shift of emphasis eration, they had acquired competence.
became evident. Equipment for which con- Standard procedures had been established
tracts had been placed in 1941 and in the which cut down paper work and red tape,
first months of 1942 was beginning to come and permitted heavy work loads to be han-
off the production lines in ever-increasing dled with a minimum of confusion. New
volume. Another year would pass before duties such as renegotiation, cancellation
contracting reached its peak. But atten-
processes, and close-pricing programs were
tion was shifting from procurement to dis-
being integrated into the procurement struc-
tribution.39 By the spring of 1943 the pro-
curement agencies had hit their stride. With ture. The inspection function, now centered
39
in the Signal Corps Inspection Agency at
Andre E. Gerard, The Story of Supply in the
Signal Corps in World War II, Pt. II, Procurement
Dayton, was past the initial reorganization
(1945), SigC historical monograph B-lb, p. 9. headaches and was beginning to show
SigC Hist Sec File. For a general discussion of War strength. Best of all, the over-all production
Department procurement policies see Smith, Army
Procurement and Economic Mobilization. statistics of the Signal Corps were encour-
504 THE SIGNAL CORPS
aging, although there were weak spots in spectrum reserved for commercial broad-
some fields. casting was large enough to permit far more
lax adjustment of the sets.
Industrial Capacity for Production
Military radio had to be exceedingly pre-
The electronics industry by early 1943 cise. Each army used as many as 4,000
was beginning to reach heights of produc- transmitters, and three, four, five, or more
tive capacity hardly deemed possible only armies might fight jointly on a single front.
a year before. In only twelve months it That meant slicing the radio spectrum into
had been changed from a basic assembly thousands of bits—thin bits. It also meant
industry to one in the first stage of mass that radio receivers as well as transmitters
production.40 There was still both public must squeeze in between the closely packed
and official impatience when any headline channels, and once there, stay there. Fur-
seemed to indicate a lack of radio commu- thermore, the radios of the armed services
nication at the times and places troops worked around the clock, in all sorts of
needed it. What the public, and indeed weather, under the most severe climatic
many field commanders, did not fully un- changes. They had to survive rough han-
derstand was that military communication dling, frequent packing, and moving about
equipment was much more complex and in all manner of vehicles. In short, like the
difficult to build than comparable equip- soldiers they served, they had to withstand
ment for civilian use. all the hardships of battle. It was not easy
The peacetime radio industry, for exam- to build that kind of equipment.42
ple, was on a highly competitive, mass-pro- Some Signal Corps planners believed that
duction, low-price basis. The quality of the industrial capacity of the communica-
the product was good enough for the con- tions industry was large enough to support
ditions of use encountered, but fell far short all requirements, except for a few special
of military quality standards. It required items. Maj. D. C. Graves of the Facilities
a long time to change over to the high qual- Branch said in April 1943 that there had
ity level required in military communication always been excess capacity available ex-
equipment. Even the more experienced and cept for radio transmitters, highly compli-
reliable peacetime Signal Corps suppliers cated equipment such as radar, and certain
had difficulty in meeting the quality stand- critical parts, materials, and components.
ards for making the more complex types of What appeared to be lack of capacity was
Signal Corps equipment.41 in reality caused by a lack of raw materials;
A civilian radio set could not simply be new developments, particularly in radar;
transported to the field of battle and put to changes in specifications; and requirements
use. Home radios operated only a few not anticipated far enough in advance of
hours a day, in carefully controlled tempera- desired deliveries.43
tures. Moreover, the portion of the radio Nevertheless, it was these few special
40 42
CSigO, Annual Report, 1943, p. 255. Stong, "Allo Maroc!" Bell Telephone Maga-
41
1st Ind, Col Lester J. Harris, Dir of SigC zine, XXII, 154-55.
43
Inspec Agency, to IG, 12 Jun 43, on Ltr, Lt Col Memo, Graves for O/C Facilities Br OCSigO,
A. H. Nordstrom, IGD, to IG, 21 May 43, sub: 10 Apr 43, sub: Reasonable stabilization of prod
Study of adm of SigC Inspec Agency. IG 333.1 schedules. SigC FM 400.192 Prod Lines—Con-
SigC Inspec Agency (21 May 43). tinuation, Cessation, Maint, 1942—43.
THE TECHNICAL SERVICE A SUPPLY SERVICE 505
items that were still causing production dif- proved for the largest wire plant con-
ficulties. The wire and cable industry fur- structed during the war until finished wire
nished an example. Four months after war was coming out of the plant,45 and 33
began the Signal Corps' $7,000,000 ex- months till acceptance rates equaled rated
pansion of wire facilities, aimed at provid- capacity. Smaller plants needed at least
46
ing 120,000 miles of wire W-110-B 6 months to come into useful production.
monthly, had cleared all procedural ob- Lack of plant capacity was usually only
stacles and was actually under way.44 But one of a number of reasons which accounted
in peacetime there had existed no need for for lagging production of special items. For
quantity production of the machinery re- example, power units for radio equipment
quired to manufacture wire: plastic and were in short supply by late 1942. The Sig-
rubber extruders, braiding machines, knit- nal Corps had sponsored two plant expan-
ting machines, twinning and cable ma- sions, at Eicor, Inc., in Chicago, and at the
chines, and test equipment. Only a few small
Bridgeport, Connecticut, plant of General
companies manufactured such machinery,
Electric Company, and the industry itself
and they alone possessed the necessary ma-
had financed many additional ones. In spite
chine tools, patterns, and the special
of this, plant capacity was not sufficient to
knowledge. Furthermore, most machines
produce the estimated 2,000,000 units
had to be specially built for each sep-
needed for 1943. Manufacturers were
arate wire company. Suddenly everybody
loaded with orders, but were handicapped
wanted this machinery, and wanted it at
by shortages of material and manpower,
once. Without it, wire plant expansions
and power units were simply not being de-
could not proceed. The Army, the Navy,
livered fast enough. Expediting efforts had
the Office of Rubber Director, and three
not been very effective so far. For one thing,
separate divisions of the War Production
standardization of the brushes was necessary
Board (for copper, chemicals, and tools) all
if production rates were to be improved.
had legitimate interests in machinery pro-
Another big difficulty was that power units
duced at the small plant of the single manu-
were actually the product of two separate in-
facturer of wire insulating machinery, John
dustries, and involved the coupling of a
Royle & Sons Company. Furthermore,
generator with an internal combustion en-
the Office of Production Management had
gine. Usually, a manufacturer who pro-
followed its established procedure of assign-
duced one did not produce the other.
ing to plant equipment priority ratings no
Immediately after Pearl Harbor, generators
higher than those of the material to be man-
became the critical components of power
ufactured, and Signal Corps wire had only
units because of the heavy load on the
recently been raised to A-l-b from a lowly
electrical industry in equipping new war
A—1—i, in a time when AA's and AAA's were
plants. In late 1942, more generators were
appearing, and A-l-a's abounded. It took
20 months from the time funds were ap- 45
The St. Louis plant of the General Cable Cor-
poration.
44 46
L. H. Drake and F. W. Thomas, Industrial Sum- Drake and Thomas, Industrial Summary:
mary: Signal Corps Procurement of Wire and Signal Corps Procurement of Wire and Cable, p.
Cable, p. 45. SigC Hist Sec File. 52.
506 THE SIGNAL CORPS
available, but engines were in very short surmounting difficulties which included
47
supply. critical shortages of acetylene black and
In the dry battery field, for a further African manganese, a lack of labor, and
example, the situation was so uncertain as storage and distribution problems.
to border on the chaotic. The Signal Corps
figured requirements in terms of battery The Procurement Districts
types, while the industry figured capacity in
terms of cells, which in various combina- By midyear 1943 business was booming in
tions make up battery types. Trying to track the Signal Corps' three procurement dis-
down actual requirements, the Signal Corps tricts at Philadelphia, Dayton, and Mon-
succeeded only in producing sets of figures mouth. The Philadelphia Signal Corps
that fluctuated from month to month. The Procurement District was the largest and
changing conditions of battle, the impossi- most important of the three. Except for air-
bility of climate control, the demand for new craft items, contracted for by the Dayton
radio sets by the using forces, and the fact Signal Corps Procurement District, and
that in many cases parts breakdowns for ground radar items, purchased by the six-
sets were lacking, all contributed to the un- month-old Monmouth Signal Corps Pro-
certainty. The only thing the Signal Corps curement District, Philadelphia bought all
could be sure of was that a lot of batteries the thousands of Signal Corps items, large
were going to be needed. The full realiza- and small. In dollar value, the Dayton dis-
tion of the critical nature of dry battery trict was overtaking Philadelphia, because
supply did not become evident until near airborne communication devices were very
the end of 1942.48 In December 1942 the intricate and expensive. But the dollar value
Signal Corps hurriedly pushed through the of contracts let was not the significant meas-
first two of the dry battery expansion plans ure of work accomplished. It took almost as
which by the end of the war would cost many man-hours to process the necessary
$7,500,000 in Defense Plant Corporation papers to buy a single small and inexpensive
funds alone. Both concerned the National piece part as it did to handle a $50,000,000
Carbon Company, and were expected to order. Philadelphia handled the contracting
yield 7,448,000 cells monthly for prox- for nearly 100,000 items, fifty times as many
imity fuze batteries, and 9,000,000 cells as Dayton did. The three districts together
monthly for SRC-509, 510, and 284 radios. employed about 2,250 people, and of these
It would take more than two years to bring more than half were at Philadelphia.49
these plants into maximum production after By this time the measure of control which
47
the Office of the Chief Signal Officer exer-
(1) Minutes of Meeting of the Fractional
Horsepower Industry Advisory Committee, 6 Nov cised over contracting had been greatly
42. SigC 412.41 Dynamotors, Industrial Mobiliza- relaxed. Contracting procedures had
tion Div Philadelphia SigC Proc Dist. (2) Shute,
Industrial Summary: Signal Corps Procurement of
smoothed out; contracting officers could
Rotary Equipment, pp. 12-14, and Incl 1, pp.
49
46-47. (1) Supply Sv OCSigO, Review of Production
48
Henry C. C. Shute, Prod Div Philadelphia Plans, 12 Dec 42. (2) Cerruti, Historical Narrative
SigC Proc Dist, Industrial Summary: Signal Corps of the Philadelphia Signal Corps Procurement Dis-
Procurement of Dry Batteries (15 Jan 46), p. 21. trict, Vol. I, Tab I, p. 29. (3) MS Comment, Brig
SigC Hist Sec File. Gen A. A. Farmer, USA, Ret., 15 Mar 52.
THE TECHNICAL SERVICE A SUPPLY SERVICE 507
place up to $5,000,000 without first getting these special circumstances, the Office of the
permission from higher authority,50 and the Chief Signal Officer felt it necessary to con-
use of informal contracts and letters of in- trol contracts for airborne equipment to the
tent had speeded the mechanics of placing extent of directing the Dayton Signal Corps
orders. In December 1942 the Washington Procurement District to place the contracts
headquarters had ceased to designate the with specific manufacturers. On 85 percent
manufacturer who would receive the order of the contracts, such large companies got
for a specific item, and instead permitted repeat orders time after time.53
the procurement districts to handle that re- As the winter months wore on, it became
51
sponsibility. Thereafter the Washington more and more difficult to place contracts.
headquarters provided only the Army Sup- The larger, more experienced firms were
ply Program item number, and the procure- glutted with orders; although at first they
ment district office collected the specifica- had resisted the 40 percent subcontracting
tions, which sometimes totaled as many as provisions of Signal Corps contracts, now
100, got out the quotation requests, and se- they were eager to pass along some of their
lected the manufacturing facility. This sys- work to smaller firms, and on some items
tem continued throughout the war.52 refused to take additional contracts. The
There was one exception, in the winter of number of small firms able to take on sub-
1942-43, to this trend toward decentraliza- stantial orders was decreasing, too, and
tion of contractual responsibility. Airborne those that could take orders often were not
equipment used thousands of small electrical able to follow the somewhat sketchy per-
parts, and the rapid advance of the radio formance specifications. New, detailed speci-
art, plus the "investigative vigilance" of the fications had to be worked out, and addi-
enemy in analyzing equipment on captured tional help given on every detail. All this
increased the unit cost of items. And with
Allied aircraft, had to be dealt with by the
shortages in raw materials and difficulties
constant change of components. This re-
in obtaining components such as tubes and
sulted in repeated requests from the Air dry batteries growing more acute, it became
Forces for changes in equipment even before ever more difficult to keep production lines
it got off the production line. Only the large going without interruption.
54
Other approaches to the manpower its, and to let the service having the primary
problem involved methods of increasing the interest handle the entire inspection pro-
efficiency of the inspectors, simplifying the cedure for its sister services.
jobs, and sharing the inspection load. The By one method and another, the Signal
Signal Corps tried them all. It standardized Corps steadily built up its corps of inspec-
inspection procedures, published more com- tors to 4,419 officers and civilians by the
plete instructions, and delegated more re- end of 1942, to 5,663 by March 1943, and
sponsibility to the inspectors. It broke down finally to a peak strength of 7,507 by the
67
many processes into simpler elements to per- end of June 1943.
mit less highly skilled personnel to perform Industry was being called upon to ac-
the work. complish production miracles, and at times
One very sensible approach had already felt a certain amount of irritation because
been tried in a few instances where both the military organization insisted upon such
the Navy and the Signal Corps were buy- rigid control of the methods by which the
ing the same or very similar articles from miracles came into being. Industry ac-
the same plant and had agreed to let one cepted government inspection as a bother-
service perform the inspection for both. The some but necessary procedure—even a wel-
Signal Corps encouraged the inspection come one where new items were concerned.
zones to enter into as many such arrange- But in the matter of stock items, that is,
ments as possible. By March 1943, under items of ordinary commercial use, many
such arrangements, the Signal Corps was manufacturers felt that inspection ought to
inspecting radio transmitting tubes, sonic be waived completely. In December 1942,
buoys, belts, converters, and numerous for example, the Western Electric Com-
other items for the Navy in individual pany complained that Signal Corps inspec-
plants all over the country, as well as clock tors in its Kearny plant were being too
mechanisms, switchboards, and telephones picayunish in the inspection of certain tele-
for the Marine Corps, small motors for the phone equipment being furnished on a rush
Air Forces, and radio tubes for Ordnance order. The Inspection Agency investigated,
and the Corps of Engineers. Air Forces but came to the conclusion that the inspec-
inspectors performed inspection for the Sig- tors could not do less than they had been
nal Corps on plywood parts and meters, doing, and that in fact they had been re-
Ordnance inspectors performed chassis in- quiring only a minimum of inspection.68
spection on Signal Corps trucks, and the Nevertheless, some manufacturers, or at
Navy and the Signal Corps pooled forces least some plant managers, continued to
on many radio items.66 Such arrangements feel that a product which was good enough
applied only to particular plants, not to for the public certainly ought to be good
given geographical areas or to types of enough for the Army. The whole matter of
equipment. The arrangement was to con- inspection procedures, or lack of them,
sider the situation in each plant on its mer-
67
Hist of SigC Inspec Agency, Supplement A,
66
Memo, Dir of Resources and Prod Div SOS Pers Stat, p. 2.
68
for CSigO, 27 Feb 43, sub: Inspec staffs and pro- Ltr, O/C Newark SigC Inspec Zone to O/C
cedures, and 1st Ind, Chief of Sig Supply Sv to SigC Inspec Agency, 9 Dec 42, sub: Inspec at
CG SOS, 5 Mar 43. SigC 400.163 Inspec 1, Western Electric Co. SigC 400.163 Inspec 7,
Jan-Jul 43. Oct-Dec 42.
THE TECHNICAL SERVICE A SUPPLY SERVICE 511
came to a focus in the Anaconda Wire and Inspector Shipp sent a detailed report of
Cable Company case early in 1943. these allegations and unconfirmed reports
The Anaconda case came to light largely in a confidential letter to Maj. Frank Prina,
through the alertness of a civilian Signal his superior at the Philadelphia Signal
Corps inspector, Cyrus Shipp. Shipp had Corps Procurement District. Major Prina
been assigned to the Marion, Indiana, plant promptly sent Shipp back to the Anaconda
of the Anaconda Wire and Cable Company plant, with instructions to try to find out
in the early part of 1942, then transferred to whether or not the situation was as de-
another manufacturing plant in the same scribed.
town in April. While on duty there, he be- Bit by bit more evidence came to light,
came acquainted with two former employ- to the consternation of the Signal Corps,
ees of Anaconda, who told him it was the which was very loath to believe it. The
general practice of contractors to "put Signal Corps had placed contracts totaling
things over" on the Signal Corps inspectors, well over a million dollars for assault wire,
and illustrated the ease with which it could field wire, power cable, and subterranean
be done by describing conditions at the Ana- cable with the Marion plant, and had other
conda plant. They asserted that in testing contracts with Anaconda's plant at Paw-
70
field wire W-110-B for dielectric strength tucket, Rhode Island. Business relations
and insulation resistance, Anaconda used with the company had been very satisfac-
the same reels over and over again, chang- tory, and there had been no known in-
ing the tags at night when Signal Corps in- stances of failures of the equipment in field
spectors were not present in the plant. Fur- use. Indeed, the Marion plant proudly flew
thermore, a switch device had been rigged the Army-Navy "E" pennant for excel-
up, hidden in a panel on the side of the lence in production, which had been
testing desk, and accessible to the operator,
awarded to it in May 1942, at the initiation
but unsuspected by the witnessing inspector.
of the Navy, which held the preponderance
By manipulation of this switch, the oper-
ator could change the test voltage so as to of contracts at the plant.71 In August the
secure any desired reading. Also, the in- Soviet Government had complained to the
formants said that samples of wire from Signal Corps through its purchasing com-
picked reels, selected because they would mission in the United States that field wire
pass all the necessary tests, were kept handy W-110-B furnished it through lend-lease
in a separate storage place. These were was unsatisfactory because of poor abrasion
the samples that were presented to the in-
spectors for test, although the inspectors be- Nov 42, sub: Investigation—Anaconda Wire and
Cable Co., Marion, Ind., and 1 Incl, Rpt of Lt
lieved that they were testing run-of-the-mill Thomas Swan, 4 Nov 42. SigC EO 095 Anaconda
samples. It was also alleged that fictitious Wire and Cable Company, 1942.
70
reports had been turned in on a spark test OCSigO R&W Action 1, ANEPA to Purchases
Br, 15 Dec 42, sub: Anaconda Wire and Cable
which Signal Corps inspectors had insisted Company, Marion plant, production delay. SigC
on after the Navy Department had insti- 095 Anaconda Wire and Cable Co., 1941-43.
71
gated an investigation, apparently because (1) Msg, H. Donn Keresey, president, Ana-
conda Wire and Cable Co., for Colton, 11 Jun 42;
it, too, had heard rumors of irregularities.69 (2) Msg, Colton to Keresey, 12 Jun 42; (3) Ltr,
Keresey to Elder, 9 Jul 42. SigC 095 Anaconda
69
Ltr, O/C SigC Inspec Agency to CSigO, 4 Wire and Cable Co., 1941-43.
512 THE SIGNAL CORPS
characteristics, but that complaint con- gation of the "production and inspection
cerned wire furnished by another company.72 methods being presently used by the Ana-
During September and October 1942, conda Company in the production not only
investigations, conferences, allegations, of Field Wire W-110-B but also other types
charges, and countercharges obscured the of field wire for service use" being pro-
74
situation. Officials of the Anaconda Wire duced at the plant. They were willing to
and Cable Company denied any irregular- be quoted as saying that "all charges con-
ities and were confident that the local man- tained in the reports of Mr. Shipp . . .
agement of the Marion plant was without were amply supported by substantial evi-
fault. They were inclined to blame over- dence" as shown by more than twenty
zealousness on Inspector Shipp's part, and sworn statements of employees of the Ana-
initially the Signal Corps itself was not sure conda Wire and Cable Company.75
what was happening or where the fault lay.73 By this time Anaconda officials were
About the first of November the Signal convinced that things were indeed wrong at
Corps learned that there were still more ele- the plant, and called Signal Corps officials
ments in the case which apparently had not in Washington to tell them so and to inform
been disclosed until this time. The Federal them that they were starting action to rem-
Bureau of Investigation had two agents edy the situation insofar as possible. The
in Marion, and was conducting an investi- Signal Corps Inspection Agency for its part
was concerned about the evidence of faulty
72
(1) Ltr, The Soviet Government Purchasing inspection procedures used at the Marion
Commission in the U. S. A., to Lt Col A. E. Brund- plant which had permitted the situation to
age, 3 Aug 42; (2) Ltr, Brundage to Soviet Gov-
ernment Purchasing Commission, 21 Sep 42, sub:
exist before Inspector Shipp came on the
R-118; Order 2588-Phila-42; (3) Ltr, Capt C. R. scene. It again overhauled its inspection pro-
Brearty, OCSigO, to O/C Philadelphia SigC Proc cedures in an effort to be sure that no other
Dist, 24 Aug 42, sub: Wire W-110-B, Order 2588-
Phila-42, and Incl, Rpt on Conf re Order 2588-
such case would arise. It also took steps to
Phila-42, to 3d Ind, Asst Exec Officer Philadelphia see that none of the faulty field wire it had
SigC Proc Dist to Mat Div OCSigO, 9 Sep 42. accepted got into the hands of troops over-
SigC 095 Anaconda Wire and Cable Co., 1941-43. seas.
73
For a detailed account of the Anaconda inves-
tigations, see the following: (1) Memo, Lt Col Paul The Anaconda Wire and Cable Com-
Hannah for Dir of Mat Div, 16 Jan 42, sub: Ana- pany of Marion and five of its officers and
conda Wire and Cable Co. SigC RP 095 Anaconda
Wire and Cable Co., 1942-43. (2) Incl 1, Report
employees were indicted for fraud. In fed-
of Major [Eldon] Koerner, 5 Nov 42, with Ltr, O/C eral court, on a plea of nolo contendere,
SigC Inspec Agency to CSigO, 11 Nov 42, sub: the company received the maximum fine of
Anaconda Wire and Cable Co.; (3) Incl, Report
of Lt Thomas Swan, with Ltr, O/C SigC Inspec
$10,000, while the five individuals received
Agency to CSigO, 4 Nov 42, sub: Investigation— other fines along with prison sentences
Anaconda Wire and Cable Co.; (4) Incl 2, Report which were to be suspended upon payment
of A. B. Busch, 6 Nov 42, with Ltr, O/C SigC of the fines. Judge Thomas W. Slick, in sen-
Inspec Agency to CSigO, 11 Nov 42, sub: Ana-
conda Wire and Cable Co. SigC EO 095 Anaconda tencing the general mills manager of Ana-
Wire and Cable Co., 1942. (5) Excerpts from conda and the local plant manager, said,
Diary of Maj Kenneth Johnson, 31 Oct 42; 4 Nov
42. SigC 314.7 Legal Officer's Diary 2. (6) Ltr, "I believe these men can better serve the
Julius H. Amberg, Spec Asst to SW, to Tom
74
Clark, Chief of War Frauds Unit Dept of Justice, Rpt Maj Koerner, 5 Nov 42, cited n. 7 3 ( 2 ) .
75
30 Dec 42. OUSW 095 An-Aq. Rpt of Lt Swan, 4 Nov 42, cited n. 73 ( 3 ) .
THE TECHNICAL SERVICE A SUPPLY SERVICE 513
war effort by getting back to work," and at Marion, it did not regain full production
added that he believed the case would stop until the third quarter of 1943.78
anything of a similar nature anywhere The wire fraud cases resulted in a general
76
else. tightening of inspection procedures in the
This hope apparently was not to be fully Signal Corps Inspection Agency. Actually,
realized, however, for in the meantime, on insofar as inspection jobs in wire plants
15 January 1943, the government brought were concerned, the effect was bad. In-
a second criminal suit against the Anaconda spectors became uneasy, and inspection
Wire and Cable Company in its Pawtucket jobs became hard to fill. Signal Corps in-
plant; on 4 May suit against the Collyer spectors in wire plants became overexact-
Insulated Wire Company, with plants in ing, much of the good will that had existed
Providence, Pawtucket, and Central Falls, previously between the Army and the in-
Rhode Island—all on similar charges; and dustry was lost, and many manufacturers
on 1 December 1943 another against the became reluctant to accept new Signal
Acorn Insulated Wire Company, Incorpo- Corps contracts.79 On the other hand, the
rated, of Brooklyn, New York.77 In each inspection activity as a whole benefited
case the company involved and the in- from the increased attention to inspection
dicted employees and officials were found procedures. This was demonstrated on
guilty, fined, and the individuals concerned 2 July 1943, when the ASF released its re-
given prison sentences, except in the Collyer port on inspection procedures in the various
case, where the three top officials indicted technical services. The Signal Corps and
were cleared of fraud. The Anaconda Wire the Chemical Warfare Service were rated
and Cable Company in the meantime had as the best of the technical services on
replaced for the Signal Corps all of the de- nearly every point considered by the sur-
fective wire which could be traced and re- vey: uniformity of method; responsibility
of inspectors; control of inspection practices;
turned to it. It also settled a civil suit against
training; co-ordination of inspection and
it on terms considered favorable to the
testing; and collaboration between devel-
government.
opment, engineering, production, and in-
Quite aside from the moral and legal as-
spection units in simplifying equipment de-
pects involved, the loss of production of field 80
sign and specifications.
wire and cable was significant. At a time
when the country was building up strength
The Increasing Importance of the
for its first major offensive, and unprece-
Distribution System
dented quantities of field wire were needed
by combat troops, a severe blow had be- When war came, the initial emphasis
fallen the wire industry as a whole. The naturally fell on procurement, the first
production rate of wire W-110-B during
78
1943 never equaled that for the fourth Drake and Thomas, Industrial Summary: Sig-
nal Corps Procurement of Wire and Cable, p. 52.
quarter of 1942. As for the Anaconda plant 79
Ibid., p. 53.
80
Report of Inspection Survey for Inspection
76
The New York Times, June 13, 1943. Section, Facilities and Materiel Branch, Production
77
Ibid., January 15, May 4, and December 1, Division, Hq ASF, by the Trundle Engineering
1943. Company. ASF Prod Div File, DRB AGO.
264-211 O - 78 - 34
514 THE SIGNAL CORPS
broad phase of supply. But equipment was with the increasing emphasis on distribu-
of little value in the factories, or in depots,
tion was the most sensitive spot in the
or on the docks, or in warehouses, or any- supply body. The single teletype machine
where else except in the hands of the fight-linking the branch with the Philadelphia
ing men who used it. Thus as procurement Signal Depot had grown into a battery of
became more stabilized and increased quan- four machines connected with the large de-
tities of signal equipment became available,pots.82 Every day its 1,200 employees proc-
essed a small mountain of requisitions, stock
the second phase of supply, distribution, be-
gan to receive more critical attention. A records, and other papers and forms, with
reorganization of General Colton's Signal an efficiency somewhat impaired by the
Supply Service in the Office of the Chief fact that they were housed in several build-
Signal Officer in December 1942 created a ings scattered over Washington. It was a
Distribution Division, thus underlining the logical step in the progression toward de-
growing importance of this aspect of sup- centralization to gather up these scattered
ply. To head the new division, Colton felt employees, and transplant them to Phila-
lucky to have David H. O'Brien, vice presi- delphia, where the depot, already acting as
dent of the Graybar Electric Company.81 gratuitous landlord to several other Signal
Moving the material from the factory to Corps agencies, could offer them house
space.
the battle front was the responsibility of the
distribution system. Interrelated in this ef- On 8 October the move was made, the
fort were the depots—into which supplies actual transfer taking place all in one night,
flowed directly from the manufacturing with an office force already set up and op-
plants for storing and packaging, and out erating in Philadelphia while the bulk of
of which they moved to troops—and the the personnel reported for work. The Stor-
agencies which maintained the records that age and Issue Branch had hoped that most
provided means of cataloguing and identi- of its employees would go with it to the new
fying equipment and of controlling the flow location, but as it turned out almost 30 per-
of supplies. cent of them chose to stay in Washington
and had to be replaced, a serious blow at
Stock Control: The Storage a time when the work load was very heavy
and Issue Agency 83
and getting heavier. The movement of
The stock control function at the end of supplies to North Africa was still not com-
the summer of 1942 was centered in the plete and would be a continuing operation
Storage and Issue Branch of the Materiel for several months to come. Storage and Is-
Division, just where it had been at the be- sue initiated movement of equipment to
ginning of the war. But Storage and Issue units prior to their activation, to task forces,
had suffered growing pains no less acute and to organizations already overseas. It
than those of the other sections of the Of- prepared all the maintenance parts lists,
fice of the Chief Signal Officer, and now maintained suspense files for future ship-
81 82
(1) Signal Corps Administrative Log, 1939- Morton H. Ullery, History of the Storage and
1945, OCSigO Orgn Chart 19, 14 Dec 42, p. 64. Issue Agency (1946), Vol. I, p. 42. SigC Hist Sec
SigC Hist Sec File. (2) Supply Sv OCSigO, Re- File.
83
view of Production Plans, 12 Dec 42. 1bid., pp. 44-45.
THE TECHNICAL SERVICE A SUPPLY SERVICE 515
ments, prepared all depot requisitions, Storage: The Signal Depots
shipping, marking, and packaging instruc-
tions, and maintained all stock records. To While the Storage and Issue Agency
lighten its burdens, all distribution func- struggled to keep some sort of control in its
tions relating to radar, meteorology, fixed stock control functions, the depots which
installation equipment, and airborne ma- were the repositories of the stock continued
tériel had already been taken away from it to grow, in number and in volume. After
and allocated to other agencies. The busi- July 1942 the signal sections of depots were
ness of assigning stock numbers and nomen- termed simply "signal depots." 88 By No-
clature had also gone elsewhere.84 But a very vember 1942 there were 10 signal depots,
large amount of important work remained. either wholly Signal Corps establishments,
To a considerable degree, success or failure or within general depots, at Philadelphia,
of the signal supply mission hinged upon the Lexington, Dayton, Atlanta, Chicago, San
success or failure of the Storage and Issue Bernardino, Memphis, New Cumberland,
Branch. San Antonio, and Ogden. Before the end of
On 1 January 1943 the Signal Corps the fiscal year 3 more were added at Boston,
formally recognized the importance of Stor- Sacramento, and Seattle. To deliver air-
age and Issue by making it a separate borne radio equipment to west coast air-
agency. Now the chain of command moved plane manufacturers faster, the Dayton
from the Office of the Chief Signal Officer Signal Depot on 31 May 1943 opened a
through the Signal Supply Service to the Western Branch, with 200,000 square feet
Distribution Division, then through the of space at Los Angeles and another 80,000
Storage and Issue Agency to the depots. at San Pedro. The 13 depots altogether oc-
The number of requisitions continued to cupied more than 100 buildings, with a
rise: in January the agency issued 8,016 of total floor space of almost 8,500.000 square
them; in March, 10,858; in May, 14,280; feet. In addition, there was over 3,000,000
and in June, 16,517.85 To handle the work, square feet of open storage space. The need
the civilian staff increased from 1,017 in for more storage space of all types was ex-
January to 1,317 in March, and then to pected to increase for at least the next six
1,525 in June 1943.86 Yet, by June, the months.89
agency was staggering. Personnel, space, Each of the depots had its special prob-
and equipment all were overtaxed. There lems, but the need for more space was
was a tremendous backlog of work: un- common to all of them. The Chicago Signal
posted records, unanswered correspond- Depot furnished an example. Measured on
ence, unfiled reference material, stock re- the peacetime scale of military meagerness,
quirements for which no purchase requests the depot between wars had been a fair-sized
had been written, and 6,000 unprocessed installation, occupying three large ware-
requisitions.87 88
OCSigO R&W Action 1, S&I Br to Mil Pers
Br, 29 Jul 42, sub: Transfer of officers. S&I
84
Ibid., p. 56. Agency Info File, Philadelphia.
85 89
Ibid., Tab 7, Vol. II. (1) OCSigO, Annual Report, 1943, pp. 284-
86
Ibid., Tab 8, Vol. II. 85. (2) History of the Dayton Signal Supply Ag-
87
Ibid., Vol. I, p. 62. For a discussion of storage ency, Chronology, p. 14. SigC 314.7 Hist of Proc
and issue functions after mid-1943, see Thompson Dist, USAF Mat Comd Central Files, Wright-Pat-
and Harris, The Outcome, passim. terson Air Force Base, Dayton, Ohio.
516 THE SIGNAL CORPS
house buildings, and staffed by two or three sembled the SCR-299's and installed them
officers and about 25 civilians. By 1943 the in the trucks and trailers. By early 1943 the
depot had expanded enormously. It occu- depot had shipped 1,300 completed sets
pied 829,375 square feet of open and closed to tactical units in this country and over-
warehouse space, and required 51 officers seas, as well as 125 each to the British and
and 2,784 civilians to keep it operating con- to the Russians, and three each to China
tinuously. The depot, located strategically and Mexico. All those for lend-lease were
in the nation's most extensive transporta- boxed in waterproof boxes weighing 16,800
tion center, sent 75 percent of its shipments pounds. Outside the building was 180,000
overseas, handling 3,000 requisitions for square feet of open storage space, where
6,000 tons of incoming shipments and requi- 1,000 more trucks waited for SCR -299
sitions for about the same outgoing tonnage stallations.
monthly. To handle the message traffic, The depot employed 216 people in its
there were 700 lines of automatic switch- repair shops alone, where radios, tele-
board, with 300 more soon to be installed; phones, teletype equipment, motor gener-
5 Bell printers, including 2 perforator trans- ators, typewriters, meters, and motion
mitter sending and receiving printers picture equipment were made serviceable.
equipped with a distribution switch; 3 Both men and women were being trained in
teleprinters for Western Union; 1 for Postal repair operations.
Telegraph; and a direct line and printer Besides its own activities, the Chicago
from each teletype room to the corps area Signal Depot early in 1943 acted as host
radio station. for the Chicago Signal Corps Labor Office,
Teletype, dry batteries, and the assem- the Chicago Inspection Zone, field offices of
bly of SCR-299 radio sets were three of the Signal Corps Stock Numbering Agency,
the most important specialties handled by the Philadelphia Signal Corps Procurement
the Chicago Signal Depot. It was the desig- District, and the Cost Analysis Section of
nated storage point for all the Signal Corps' the Office of the Chief Signal Officer, and
teletype equipment. As for dry batteries, the for two training schools, a radio school for
depot continued as it had in the past twenty field artillery officers and a depot proce-
years to handle all purchases and inspection dures training school for enlisted men se-
of all dry batteries for the Army. In the lected from Camp Crowder. The com-
fiscal year 1942 it bought 65,000,000 bat- manding officer, Col. F. E. Eldredge, was
teries; the requirement for fiscal year 1943 a reservist who had been called back to
was set at 150,000,000 and it was expected active duty in October 1940 and who had
that even more would be required in served as executive officer under Brig. Gen.
1944. Two floors of one of the large ware- A. A. Farmer at the Philadelphia Signal
house buildings were devoted to battery Depot before coming to Chicago. Despite
storage. the space he had, Eldredge needed more.
To take care of the SCR-299 sets, the He wanted more warehouses, he hoped to
depot had acquired the former General install a cafeteria for his workers, and he
Motors Building, containing about 200,000 had his eye on a garage building where he
square feet, and here depot workers as- could install garage and repair shop facili-
THE TECHNICAL SERVICE A SUPPLY SERVICE 517
ties for the trucks and motor vehicles be- vania, had come into being at the close of
longing to the depot.90 World War I, especially to store and dis-
The signal section at the San Antonio pose of signal equipment returned from
Army Service Forces Depot was one of the overseas, an activity which had continued
oldest, dating unofficially from 1876, when well into 1939. Through the years from
San Antonio received the new military 1918 until 1940, its duties had not changed
telegraphy system which General Greely very greatly. For awhile, from 1920 until
had brought to Fort Lancaster a year ear- 1939, it was the principal distribution depot
lier. The World War I period had brought for pigeon equipment. But its most impor-
San Antonio a sharp increase in signal ac- tant activity began in 1930, when it was
tivity, along with the fledgling aviation named the principal storage depot for field
service then under the Signal Corps' aus- wire, a mission which was to assume major
pices. World War II brought bustling ac- importance in World War II. When Maj.
tivity to San Antonio once more, and by Harold R. Jordan was recalled from the re-
June 1943 the signal section had 13 officers tired list in 1940, and assigned to duty as
and 250 civilian employees who in May had Signal Officer at New Cumberland, he
processed 3,883 shipments, comprising found a depot not greatly enlarged since
1,793 tons of material. San Antonio was a 1933, when it operated 61,975 square feet
key depot for Stromberg-Carlson tele- of storage space and 10,000 square feet of
phones and parts. It also supplied signal open storage space. Jordan had only one
items to the many posts, camps, and stations assistant, a warehouse foreman, and a few
of the 8th Service Command and operated laborers, who had no mechanized equip-
a signal repair shop for the command. It ment. He started building up a supply of
occupied four warehouses, including a new modern warehouse handling equipment,
processing section devoted to fungus-proof- and hiring and training workers to operate
ing and moisture-proofing equipment for it. By the time war came, New Cumberland
overseas shipment. Altogether, , it had had a head start in the methods and pro-
143,000 square feet of open and closed cedures that would be necessary to handle
warehouse space, but it was 84 percent oc- the gigantic amounts of field wire that
cupied, and the commanding officer was would be swallowed up by World War II.
looking hopefully at new warehouses being In 1933 New Cumberland had handled
built on the post, hoping soon to acquire 1,056 tons of incoming and outgoing equip-
more space and to be able to consolidate ment during the entire year. In 1943, in
operations.91 the peak month of August alone, it handled
The signal section of the New Cumber- 5,037 tons. Besides field wire, New Cum-
land Depot at New Cumberland, Pennsyl- berland was now handling about 1,500
other items. In addition, it was a key de-
90
(1) History and Current Activities of the Chi- pot for lend-lease material, the repository
cago Signal Depot, Jan 43, passim. SigC Hist Sec and issue point for over 4,000 items. An-
File. (2) Shute, Industrial Summary: Signal
Corps Procurement of Dry Batteries. other unique function was salvage of elec-
91
(1) History of the Signal Section of the San tron tubes for scarce precious metals.92
Antonio ASF Depot, passim. SigC Hist Sec File.
92
(2) ASF Monthly Prog Rpt, Sec 2-H, Storage History of the Signal Section New Cumber-
Opns, 30 Jun 43, pp. 39, 54. ASF Files, DRB land ASF Depot, New Cumberland, Pa., passim.
AGO. SigC Hist Sec File.
518
All the depots had common problems To some extent, depots specialized in the
stemming from the lack of any strong con- stock they carried, but in general by this
trol at staff level over warehouse proce- time they carried stocks of all ordinary sig-
93
dures and operating activities. Until the nal items. Although each depot sent in daily
advent of the Distribution Division in De- reports listing its surpluses and shortages,
cember 1942, the depots had been left very some were continually overstocked on some
largely to themselves, except for such su- items, understocked on others. If a requi-
pervision as the overburdened Storage and sition called for an item not in stock, the
Issue Branch could give them. The result depot could do one of three things: tell the
was that procedures varied from one depot requisitioning agency to reorder it from an-
to another, particularly in warehousing. other depot, ship a substitute item, or sim-
95
Some depots were wasteful of storage space, ply hold up the order. Any one of these
and others economical; some handled stock courses of action was time-consuming, and,
at far less cost per ton than others; some to the organization waiting for the supplies,
had modern warehousing equipment such completely frustrating.
as fork lifts and trucks, and others had none. The situation was not confined to the Sig-
All of them operated under a system of max- nal Corps—the ASF headquarters was
imum and minimum stock levels, set indi- deeply concerned over operating inefficien-
vidually by the Storage and Issue Agency, cies in all the technical services' depots.
which also determined the depot to which Early in 1943 the ASF's Operations and
equipment on any given order would be Control Divisions undertook a joint study
sent. When stock was received, it was stored of the operating and storage methods of
according to class, each depot attempting typical depots of the seven supply services.
to store material in the same general fashion, The findings issued in March found much
so that depot officers and workers could to criticize. It was charged that all the sup-
be moved about from depot to depot and ply services had set up too many interven-
still be able to find any item in any depot. ing levels of command between the depots
This did not always work out; not all the and the chiefs of supply. The cumbersome
depot buildings were alike, and first con- clerical and administrative procedures that
sideration had to be given to the size and resulted required far too much paper work.
weight of certain items, rather than the class According to the report, methods of han-
into which they happened to fall. Signal dling material were not uniform, there were
items were further classified as controlled too few training programs for depot person-
and restricted items, issued only on orders nel, and improper stock catalogue numbers
from the Chief Signal Officer, or as requi- and nomenclature accounted for more
sitioned items, which could be issued to any wasted time and manpower at depots than
post, camp, or station signal property did any other single factor.96 The report
officer.94 spoke approvingly of the system just put
93
Capt Charles R. Novick, The Story of Supply into effect by The Surgeon General at all
in the Signal Corps in World War II, Pt. IV, Dis-
95
tribution (1945), SigC historical monograph B-ld, Novick, Story of Supply in the Signal Corps,
p. 23. SigC Hist Sec File. Pt. IV, p. 24.
94 96
Ullery, History of the Storage and Issue Summary of Conclusions and Recommenda-
Agency, Tab 43, Statement of Storage and Issue tions, Rpt 67. Denot Operations, Control Div SOS,
Agency Functions, 11 Sep 42. Mar 43. DRB AGO.
THE TECHNICAL SERVICE A SUPPLY SERVICE 519
medical depots. This so-called "key depot made a start on them, the time allowed to
plan" divided the country into three geo- effect the "complete reorganization" was
graphical areas and provided for storing exceedingly short. For one thing, the plan
medical supplies of a given kind in only one required mechanization of warehouses, in-
depot within an area, so that requisitions cluding the use of pallets and fork lifts,
for a certain item would always be ad- which the Signal Corps had only begun to
98
dressed to one depot, which was expected use in a few of its depots. Hand trucks,
to be amply supplied with the particular warehouse trailers and tractors, stackers,
item at all times. Only after the key depots lifters, elevators, jacks, and conveyor belts
were stocked would others be supplied with had their place in the mechanization pro-
the particular item. Thus an agency mak- gram as well. The pallet system was ob-
ing a requisition could be sure that the key viously a saver of both space and manpower,
depot would have the material requested if but at first the Signal Corps found that it
it were available anywhere. was not an unmixed blessing. Because ma-
The key depot plan could not be adopted terial could be moved about much more
for all signal items, which differed vastly rapidly and frequently, the system permitted
in bulk and character, and were infinitely material to be placed in any available space
varied as to delicacy, complexity, and the in the warehouse instead of in a predeter-
areas of use. Some specialization already ex- mined order. This in turn meant installing
isted. The Dayton Signal Depot, for exam- a locator card system to show where the
ple, stocked all nonclassified airborne and material might be at any given time. Theo-
all meteorological equipment; Lexington retically, each time the material was moved,
carried radar and other classified radio the new location was entered on the locator
equipment; the Chicago Signal Depot, dry card. In practice, the untrained workers of
batteries and teletypewriter equipment; and rather low wage classification who did the
Philadelphia, the photographic stock. To moving seldom bothered to make the nota-
further the plan, fifteen types of signal tions on the locator cards.99
equipment were classified as key depot Throughout the early summer the de-
items, to be carried at one depot only.97 pots worked feverishly to put their proce-
The recommendations of the Operations dures into acceptable form. The rate of
and Controls Divisions were mandatory; mechanization in the four months between
they provided for a complete reorganiza-
tion of the depot system by 1 July. Although 98
Pallets were rectangular platforms about two
the Signal Corps had already put many of or three feet square, constructed in two layers of
boards separated by 2 x 4's on edge. Containers
the recommendations into effect, or had were stacked one on top of another, with pallets
in between. Fork lifts were squat machines equipped
97
Novick, Story of Supply in the Signal Corps, with a mast consisting of two vertical steel tracks
Pt. IV, App. E. The list included batteries, tele- on which traveled a protruding part having two
type, meteorological and photographic equipment, fingers, or forks. The truck inserted its forks be-
pigeons and pigeon supplies, instruction books, air- tween the pallet's two platform layers, and thus
borne equipment, spare parts for ground electron- moved the loaded platform. Fork lifts could stack
ics and fighter-control equipment, automatic cen- equipment ten or twelve feet high quite easily, thus
tral-office switching equipment and spare parts, com- saving both space and manpower. Novick, Story
mercial telephones and spare parts, and Army Air- of Supply in the Signal Corps, Pt. IV, p. 28.
99
ways Communications System fixed station equip- History of the Philadelphia Signal Corps De-
ment and major plant items. pot, Vol. II, p. 152. SigC Hist Sec File.
520 THE SIGNAL CORPS
January and May was impressive, despite Washington, and from returning combat
the initial reluctance of depot employees officers and men the Signal Corps received
to use the new devices. For example, dur- reports that permitted a constant check on
ing the period the number of fork-lift trucks the quantity and quality of equipment.
in use at depots increased from 14 to 80, The reports from all fronts were remark-
pallets from 269 to 26,594, two-wheeled ably consistent. With only a few exceptions
hand trucks from 617 to 1,447, and ware- the performance of Signal Corps equip-
house trailers from 956 to 1,131.100 Depots ment was excellent, and combat soldiers
reported progress measured in other statis- and field commanders alike praised it
tics: unfilled requisitions on hand at the highly. Nevertheless, there were complaints,
end of the month had dropped from 31,992 and they fell into three categories. Thea-
in January to 16,090 in May; requisitions ters felt that signal items did not reach
filled had risen from 28,716 in January them quickly enough. Often when items did
to 40,690 in May. The number of personnel arrive, they were damaged as a result of
had also risen, however, from 14,873 in Jan- poor packaging or waterproofing. Finally,
uary to 17,491 in May, and the number of there was almost universal complaint about
requisitions filled by each civilian employee the lack of spare and repair parts.
had not made a very impressive gain.101 Some of the deficiencies of distribution
The Storage and Issue Agency, which is- resulted from factors beyond Signal Corps
sued the requisitions in the first place, still control. For example, until the procure-
had a large backlog. The tonnage of equip- ment lag was overcome and deliveries
ment coming into the depots continued to caught up with requirements, the Signal
rise, and demands from the theaters of op- Corps could not immediately furnish all the
eration to increase. There were numerous theaters with all the material needed. Most
complaints of signal supply failures and de- theater commanders had little conception
ficiencies overseas. It was obvious that the of the length of time required to produce
Signal Corps distribution system still had a electronic equipment. Whether for military
tremendous job ahead of it, and that it or civilian use, electronic items on the aver-
would have to improve a good deal more age required from two to four years to de-
before there would be anything to boast velop, one or two years from development
about. until production began, and ordinarily
another one to two years to complete pro-
102
Overseas Complaints of Distribution duction on a specified contract. The War
Deficiencies Department policy of putting items on
tables of allowances as soon as they were de-
It was not enough to get equipment to veloped and adopted for military use, with-
the theaters of operation; it had to arrive out regard as to whether or not they were ac-
in good condition and give the best possible
tually in production, naturally led com-
service for the maximum length of time.
manders to ask for items which were not
From signal officers in the field, from spe-
yet delivered from the manufacturer.
cial observers and inspection teams sent from
Furthermore, theater commanders de-
100
Ullery, History of the Storage and Issue Agen-
102
cy, Tab 43, Report of Signal Corps Depots, 1 Jul 43. MS Comment, Brig Gen R. B. Colton, USA,
101
Ibid. Ret., 14 Sep 53. SigC Hist Sec File.
THE TECHNICAL SERVICE A SUPPLY SERVICE 521
manded a great many items not on the tions where the greatest tactical success was
tables of allowances, and not even included achieved; when armies were advancing
in the Army Supply Program (ASP). 103 rapidly and headquarters moved often, they
The ASP covered requirements for the needed huge reserve stocks of fixed and
Army on a troop basis, but tactical opera- semipermanent communication installation
107
tions such as the North African invasion equipment.
showed that there had to be additional Furthermore, even had sufficient material
equipment over and above that required been available, there was a scarcity of ships
by the troop basis, to take care of what to bring supplies to such areas as the South
might be termed theater operational re- Pacific,108 and Signal Corps material carried
quirements. Tables of equipment were de- a low priority. Very often, therefore, it was
signed only to keep troop units operating on crowded off the cargo ships. When it was
a minimum basis in an average situation. put aboard, the Signal Corps had no direct
They did not provide for unusual situa- control over the loading and discharge, and
tions—amphibious operations, mountain delicate communications equipment might
warfare, or theater needs beyond the mini- be ruined by careless handling.
mum level of reserve.104 But packaging, tropicalization, and the
The War Department, therefore, in- provision of spare parts were direct Signal
stituted the "operational project." It au- Corps responsibilities. In the early months
thorized the theaters to estimate their of 1943 it was these matters that were get-
requirements for future operations, and the ting the most concentrated attention.
technical services to put the material under
Packaging and Waterproofing
procurement and make delivery against
theater requisitions as it was needed.105 By Proper packaging of signal equipment in-
May 1943 a great deal of additional signal volved many considerations, not the least of
equipment was being requisitioned for fu- which was the distance which supplies must
ture operations. Much of it was required for travel to reach the battle fronts. From the
fixed installations in the theaters, or in areas United States, the China-Burma-India
expected to be occupied soon. Equipment theater, for example, was literally at the end
for such uses was not provided for in the of the world. Once within the theater, after
Army Supply Program, which ceased to re- a 12,000-mile water journey, supplies had
flect accurately the real needs of the Army to be shipped to points as widely separated
for signal equipment, as the Chief of Staff, as San Francisco is from Buffalo, over
ASF, pointed out.106 Signal equipment dif- primitive roads or by rail that varied from
fered from other kinds of material in that standard to narrow gauge and back again.
more and not less of it was needed in situa- This required moving material from one
freight car to another, without aid of ma-
103
For a discussion of ASP see Smith, Procure- chinery, by laborers who could not be ex-
ment and Industrial Mobilization.
104
Hq MTOUSA, G-4, Logistical History of pected to obey "Fragile—Handle With
NATOUSA-MTOUSA, p. 60.
105 107
WD Cir 220, 1943. Memo, CSigO AFHQ for CofS, 31 Jan 43,
106
Memo, CofS ASF for ACofS for Opns, 11 May sub: Sig lessons of Operation TORCH. SCIA File
43, sub: Provision for additional equip in the ASP 13 (see Bibliographical Note), Matejka Rpts.
108
to meet operational rqmts. ASF ACofS Reading Ltr, Sig Officer USAFISPA to Lanahan, 6 Feb
File, May-Jun 43 DRB AGO. 43. SCIA File 8, Ankenbrandt-Newhouse Rpts, 1.
522 THE SIGNAL CORPS
Care" signs they could not read. China- handie-talkies were very poorly water-
bound supplies had to survive the dangerous proofed, and frequently became inoperable,
journey over the Hump, and the loss of a and the SCR-284's needed moisture-proof
few airplanes could mean that a month's cords, plugs, and insulators.114 The "water-
109
planning had gone for nought. It was no proof" canvas coverings provided for signal
wonder that the men in the theater often equipment were not in fact waterproof.
found the equipment that reached them Packaging had received scant attention
"pretty well beaten up." no in the first year of war. Contracting officers
About 5 percent of all signal equipment handed manufacturers the packing instruc-
received in the first landings in North Africa tion, U.S. Army Specification 100-14, and
was damaged, partly as the result of faulty assumed that it would provide all the neces-
packing, shipping, and improper stowage. sary information. Quite often, they granted
Comparatively large pieces of equipment a waiver of the specification, sharing the
which were carried on deck without full pro- contractors' feeling that it was unnecessarily
tection and sets which were stowed in leaky costly in money, time, and trouble, and that
holds suffered the most from salt spray.111 equipment was ready for shipping after it
Carrier equipment was so severely mis- had been wrapped in tar paper and
handled in transit that signal officers had to crated.115 Specification 100-14 provided
set up test and repair facilities to rehabili- that the first destination of a shipment
tate the equipment before issuing it to the would determine the method of packing to
troops. "The abuse . . . was far worse be used, and since most of the early stock
than anything that had been anticipated in was accumulated in depots for later ship-
the design or that would be at all likely ment overseas, this meant domestic pack-
... in the hands of troops." 112 The very ing only. The depots were disturbed when
first reports after the landings had unani- they realized that almost all equipment
mously stressed the inadequacy of pack- would require repacking for overseas ship-
aging, not only to avoid breakage, but to ment, for they possessed neither adequate
keep out moisture. General Matejka, AFHQ
facilities, materials, nor trained personnel to
signal officer, said flatly that "the signal
do the job. Neither did the large industrial
equipment issued was satisfactory, but the
waterproofing was not." 113 The SCR-536 concerns, the Signal Corps discovered when
the first overseas reports started flowing
109
History of Signal Corps Activities in China- back. Their experience with methods of
Burma-India, Ch. I, pp. 20-21. SigC Hist Sec File.
110
Interv, SigC Hist Sec with Sgt John E. .Duffy peacetime export packing had not prepared
(formerly 835th Sig Sv Bn, CBI theater), 16 Nov them for the problems presented by global
44. SigC Hist Sec File. warfare. There were such considerations as
111
Ltr, Sig Officer AFHQ to CSigO, 18 Apr 43,
sub: Questions desired answered by OCSigO, and the wide range of destinations, from sub-
Incl 1, Answers to 156 Questions. SCIA File 13, zero arctic to the tropical Pacific islands;
Matejka Rpts. transportation by air, ocean, rail, motor, or
112
Memo, Maj M. M. Bower for CSigO, 10 Aug
43, sub: Rpt of special mission to North Africa to
animal pack; the length of time goods might
introduce spiral-four cable carrier and temporary
114
pole line material. North Africa 2, SigC Hist Sec Ltr, Sig Officer I Armored Corps to CSigO,
File. 11 Jan 43, sub: Rpt of Operation TORCH 8-11
113
Memo, Sig Officer AFHQ for CofS, 31 Jan Nov 42. SCIA File 1, Hammond Rpts.
115
43, sub: Sig lessons of Operation TORCH. SCIA Novick, Story of Supply in the Signal Corps,
File 13, Matejka Rpts. Pt. IV, pp. 36-38.
THE TECHNICAL SERVICE A SUPPLY SERVICE 523
be in transit; and conditions at the end of size and complexity of the packaging prob-
the journey, when supplies were likely to be lem. The Signal Corps asked for advice and
stored in the open for long periods of time assistance from other services and organiza-
for lack of warehousing and handling tions which had packaging problems: Ord-
116
facilities. nance, the Quartermaster Corps, the Corps
In July 1942, with the invasion of North of Engineers, the Canadian Mission, and the
Africa only four months away, the Signal Navy. To centralize activities and fix re-
Corps took the first short step toward putting sponsibilities, the Signal Corps raised the
its packaging activities into organized form, packing subsection to section status, assigned
with some degree of staff authority. It or- officer and civilian specialists, and gave the
ganized a packaging unit as a subsection of green light to elaborate expansion plans. A
the Storage and Issue Branch of the Office conference in June 1943 brought together
of the Chief Signal Officer, and staffed it representatives of Army Service Forces, the
with one civilian. His stated duties consti- Chief of Chemical Warfare Service, The
tuted a fairly large order: to solve the pack- Surgeon General, and all Signal Corps de-
aging problem at the initial point of pur- pots, engineering groups, procurement dis-
chase, at assembly plants and depots, and tricts, inspection zones, and laboratories to
at the laboratories, to assure the "proper use discuss the problem.119
of lumbers and other materials . . . and Throughout the early summer Packing
also their preservation during the process of Section personnel worked feverishly, writing
uncrating," and to "assure that all parties packaging specifications for individual items
concerned with packing and crating are of equipment. But there were thousands of
carrying out instructions and performing items; the war would be won or lost before
their work in the proper manner." 117 In individual specifications could be produced
October, the packaging subsection moved for all of them. And specifications were not
with the Storage and Issue Agency to Phila- enough. As Lt. G. Mark Strohecker ex-
delphia. By January 1943 the pressure of plained late in June, there ought to be
work forced the addition of two packaging greatly expanded facilities to expedite re-
experts and two secretaries to the staff. Still plies to complaints and inquiries; standard
this was not enough. Reports of damage marking and packing clauses for contracts
continued to flow in from theaters; pro- should be written; men should be avail-
curement districts, inspection zones, and able to teach proper packing methods to in-
manufacturers were asking for specifications spectors and depot personnel; and there was
to cover export packing; the industry was a vast amount of research and co-ordination
sending samples of packing materials for that needed attention desperately.120 It was
appraisal; and there was pressure from ASF quite evident that it was very late indeed to
118
staff level to do something. be building a packaging organization, and
Now came belated recognition of the that measures taken so far fell short of what
116
Ullery, History of the Storage and Issue
was needed. Eventually the Signal Corps
Agency, I, 385-86.
117 119
Ibid., II, App. 33. CSigO, Annual Report, 1943, pp. 286-87.
118 120
Memo, CofS for ACofS for Mat ASF, 24 Feb Ullery, History of the Storage and Issue
43. ASF CofS Reading File, Dec 42-Feb 43. DRB Agency, II, App. 35, Memo, CO Packing Sec
AGO. S&I Agency to Exec Officer, 25 Jun 43.
524 THE SIGNAL CORPS
solved the problem with notable success, but In New Guinea the signal troops with the
not until another year had passed.121 41st Infantry Division hoarded their equip-
ment, because in outlying sections every-
Tropicalization
thing had to be packed in or flown in
Wherever signal equipment was in use in over the Owen Stanley Mountains. The
hot, wet climates, it deteriorated quickly, moisture soon incapacitated the walkie-
corroding, sprouting fungus, and accumu- talkies, and even field wire lasted no longer
lating rust. Tropicalization — protecting than several weeks. Ants attacked the in-
equipment from these conditions—was sulation on telephone wires and radio con-
partly a packaging problem, but to a greater nections; salt water and spray corroded
extent one of equipment design. Signal metal parts, and jungle heat and moisture
Corps equipment was built to specifications caused the leather parts of telephone EE-8
drawn up by the using arms. These services to mold and drop off the frame.125
had expressed little interest in tropicaliza- When the using arms realized that their
tion until the first months of war brought specifications for signal test equipment
reports of equipment failure under heat and ought to include waterproofing and tropi-
moisture in New Guinea, Australia, the calization, they besieged the Laboratories
Middle East, the Philippines, and remote for modifications. Camp Coles and Fort
spots in the China-Burma-India theater.122 Monmouth divided the work. Beginning
The climate of Guadalcanal, for exam- about the middle of May 1943, Coles con-
ple, was hard on communication equip- centrated on modification kits containing
ment. From sundown to sunup, everything varnish, brushes, spray guns, infrared
was very wet, and at midday it was hot and lamps, and other items, to enable the troops
dry. Since none of the equipment was in the field to treat the equipment already
moisture-proofed or fungus-proofed, the on hand. Monmouth investigated means
men fought constantly to keep communica- and methods for moisture-proofing and fun-
tions working. They constructed heating gus-proofing items in the course of produc-
cabinets of electric lamps and scrap lum- tion.126 Contracting officers modified as
ber; covered dry-cell terminals with candle many as possible of the existing contracts
wax; and, after dumping thousands of to include a requirement that the items be
poorly packed and therefore useless bat-
teries into the ocean, discovered that pack- 125
(1) Incl, Chronological History of Signal
ing batteries in discarded ration tins as- Corps Operations of the Sunset Division in the
Southwest Pacific Theater of War, with Ltr, Lt
sured them longer life.123 Field wire in the Col Irwin C. Stoll, Div Sig Officer 41st Inf Div
South Pacific Area deteriorated so quickly to CSigO, 13 Aug 43, sub: Official rpt of Sig Offi-
124
that it was in trouble most of the time. cer, 41st Inf Div, Opns in Australia and New
Guinea, and App. covering com of marines at
121
See Thompson and Harris, The Outcome. Guadalcanal. SCIA File 71, Stoll Rpts. (2) Incl
122
ASF Mil Intel Study 8, 26 Sep 42. DRB AGO. 1 (Sec. 16), Rpt of Col Willis J. Tack and Lt Col
123
(1) Interv, SigC Hist Sec with Capt Robert Frank J. Lawrence, with Memo, ACofS AGF G-2
C. D anzer (formerly a telegraph and telephone for Ground Gen and Spec Staff Secs et al., 25
officer with the 25th Inf Div), 7 Oct 44; (2) Aug 43, sub: Observations in Southwest and South
Interv, SigC Hist Sec with T/5 Allan M. Buck Pacific theater, 5 Apr 43 to 14 Jul 43. SCIA File
(formerly 25th Inf Div, 25th Sig Co), 30 Nov 44. 46, Misc Observers Rpts, 1.
126
SigC Hist Sec File. OCSigO Engineering and Technical Sv, His-
124
Ltr, Sig Officer USAFISPA to Lanahan, 6 Feb tory of the Signal Corps Research and Development
43. SCIA File 8, Ankenbrandt-Newhouse Rpts, 1. in World War II, Vol. XI, Pt. 1, proj. 2008.
THE TECHNICAL SERVICE A SUPPLY SERVICE 525
tropicalized, and provided for it in new con- the difficulties of repair were the vagaries
tracts. Many of the processes, however, re- of the climate. In the monsoon season, the
quired special machinery and materials, heavy rains descended, and the atmosphere
and personnel trained to use them. The became hot and steamy; in the dry season
techniques were new; it would take time to the weather remained hot, but the air was
get them into operation at all the factories filled with dust. This was particularly hard
making signal equipment destined for use on equipment with any moving parts, such
in tropic regions. In the meantime, the as typewriters and teletypewriters.131 In the
Army Communications Board was studying South Pacific there was an extreme short-
the matter as well, but it would be several age of radar parts; in fact, as the Signal
months more before its report would be is- Officer, Colonel Ankenbrandt, pointed out,
sued.127 This problem, too, yielded to time there were shortages of everything: ships,
and experience, and by the end of the war supplies, harbor facilities, and storage
all signal items destined for tropical use space.132
were moisture- and fungus-proofed as a Spare parts constituted the most press-
routine matter.128 ing need in North Africa also, as Colonel
McCrary, a special representative from the
Spare Parts
Office of the Chief Signal Officer, learned
Overshadowing all other complaints on a trip to the theater early in 1943. Colo-
from overseas were the vigorous outcries nel Williams, formerly signal officer of the
over lack of spare parts. Small parts were 1st Armored Division and by February its
particularly scarce in the CBI theater. The chief of staff, said:
vacuum rectifiers on the teletypewriters
blew out because of overloading, since there We have had an awful time as far as spare
were not enough machines to go around and parts are concerned. Every place this Divi-
sion has been we left requisitions covering
no replacements for repair.129 Shipping our requirements for supply parts, expend-
space was short, theater priorities were low, able supplies for 60 days. . . . We expected
and the depot stocks in India were very to get automatic issue, but have received none
limited. In midsummer of 1943 the short- so far. We have to go to the depots and yell
age of signal supply was so critical that no and scream and steal to get even the few spare
reserves at all could be built up by units in parts we have. The worst part is to get tanks
the field, and radio stations were frequently and other vehicles with no radio equipment at
off the air for emergency repair by crews all. The mountings, plates, brackets, and
cabinets are even harder to get than the radios
who improvised as best they could without themselves. Some sets put in without cabi-
vital tools and spare parts.130 Compounding nets soon wear out. Tanks and vehicles are
127 not much good without radios . . . and a
Army Communications Board Case 72, Signal
Communications Equipment for Jungle Opera-
poor installation is better than none at all.133
tions, Aug. 43. Colonel Williams added that he lacked ade-
128
Thompson and Harris, The Outcome.
129
Interv, SigC Hist Sec with Capt Harold E. quate repair facilities. Ordnance had taken
Welsh (formerly assigned cryptographic duties in
131
CBI theater), 8 Nov 44. SigC Hist Sec File. Interv with Capt Welsh.
130 132
(1) History of Signal Corps Activities in Ltr, Sig Officer USAFISPA to Lanahan, 6 Feb
China-Burma-India, Ch. I, p. 22. (2) Interv, SigC 43.
133
Hist Sec with CWO George W. McVickers (for- Comments of CofS 1st Armored Div, 24-25
merly radio officer in the CBI theater), 14 Oct Feb 43, to McCrary, Spec Observer OCSigO.
44. SigC Hist Sec File. SCIA File 28, McCrary Rpts.
526 THE SIGNAL CORPS
over the repair of motor vehicles, and "if of the 177th Signal Repair Company, con-
the Signal Corps does not do a better job sisting of two radio repair sections, two wire
of repair of radio sets within the Armored sections, and one small arms section. In the
Force, it is quite possible that Ordnance whole detachment there were no spare parts
will take this over also." Lieutenant Blood- at all, and one of the radio repair sections
134
worth, commanding officer of a detachment had no tools.
of the 175th Signal Repair Company, re- Colonel Tully sent Washington a plea for
ported an "acute shortage of spare parts spare parts for the SCR -299 in Apr
and transportation," and added wistfully praised the performance of the 299, but said
that if he had all the authorized equipment that he feared that 35 generators which
and a few spare parts he could do a fine had been running continuously for over two
job, but that as it was "most of our work months would give out simultaneously. With
is makeshift." no spare parts, and only one spare gen-
The signal officer of the Mediterranean erator PE-95 available for replacement,
Base Section, understandably a little bitter what would happen, he asked, when all of
because he had submitted eight requisitions them reached the 3000-hour service period
in the period from 22 October to 6 March at the same time? 135
with almost no success, thought that "spare Radar spares were especially short. The
parts are more important than new equip- commanding officer of a communications
ment, and they should be sent at once." battery in an antiaircraft unit of the 68th
This was the crux of the matter. The zone Coast Artillery reported to Colonel Mc-
of interior could not fill the requisitions for Crary in February that he had been using
the very reason that spare and repair parts the SCR-268 to track airplanes with good
were also components used in new sets, and results, but that he had been unable to get
War Department policy had been to sup- any spare parts at all and his stock was
ply complete sets at the expense of spare almost exhausted.136
parts. The maintenance officer of the 34th General Matejka reported in April that
Infantry Division was "woefully short of spare parts for radar were practically non-
spare parts . . . practically all we have existent. He suggested that not only main-
is what we brought with us." His supply tenance but also breakage as a result of
consisted of some resistors and condensers faulty packaging be considered when set-
for the BC-312 and 342, a few tubes for ting up maintenance plans for supplying
some sets, and a scattering of parts for the radar spare parts. Lack of spare parts and
SCR -299. He had no spare replacement
parts at all for components had resulted in
the much-used SCR -608, 610, 511,
Rpt of536,
134
McCrary, Feb-Mar 43, following ex-
288, or 284 sets, or for the teletypewriters. tracts: (1) Comments of CofS 1st Armored Div,
24-25 Feb 43; (2) Comments of CO Detachment
The II Corps' signal officer, Colonel Tully, 175th Sig Repair Co, 25 Feb 43; (3) Comments of
who had spoken optimistically of supply in Sig Officer Mediterranean Base Sec, 8 Mar 43;
general, admitted that "there is and has (4) Comments of Maint Officer 34th Div, n.d.
SCIA File 28, McCrary Rpts.
been ever since we arrived in North Africa 135
Ltr, Sig Officer II Corps to CSigO, 9 Apr 43,
an acute shortage of spare parts for repair sub: Use of radio sets SCR -299. SCIA File
Tully Rpts.
of Signal Corps equipment, especially radio 136
Comments, CO Battery B 68th CA, Feb 43,
equipment." He cited his own detachment McCrary Rpt. SCIA File 28, McCrary Rpts.
THE TECHNICAL SERVICE A SUPPLY SERVICE 527
abandonment of complete units or impor- found them disappointing. Delivery of spare
tant parts of units during combat, he noted. parts groups was lagging, and contracts
He added that now there was also a serious with General Electric for BC-191 and
shortage of spare parts for tactical radios, BC-375 failed to specify any spare parts
and that he had to cannibalize some sets in at all. Contractors had used up all
order to repair others.137 their component parts to make complete
The Aircraft Radio Laboratory's direc- assemblies so that the assembly lines
tor, Colonel Yeager, visiting North Afri- would be kept in full production, partly
can air bases in April and May, had found in order to meet airplane assembly sched-
a "very serious shortage of test equipment ules, but also because of "the belief that
and spare parts." Among Air Transport some of the spare parts requirements are ex-
Command ferry route bases, he found Na- aggerated, and that the parts if delivered
tal, Brazil, especially short of spare parts. would not be of any immediate value." 141
At Atkinson Field, British Guiana, SCR- The second report covered spare parts
517 equipment was working only 50 percent for ground and vehicular sets, and was even
of the time for lack of parts.138 more devastating. Of the 87 outstanding
Back in Washington, near the end of contracts, 74 provided for concurrent de-
1942, three things had happened which to- livery of spare parts. Of the remaining 13,
gether blasted the question of spare parts several called for delivery of spare parts
wide open.139 The firm of management en- groups two to four months after delivery
gineers, Wallace Clark Company, issued a of the equipment, but 7 contracts with Gen-
series of comprehensive reports on spare eral Electric (the sole manufacturer of trans-
parts; the complaints of shortages started mitter BC—191, a major component of
rolling in from the North African theater; several sets) "not only do not call for con-
and the Army Service Forces, worried about current delivery, but [are protected by] a
the matter not only in the Signal Corps but blanket waiver of all spare parts deliveries,
142
in all the other supply services, stepped in to signed by the contracting officer."
take control.140 Of 63 orders on which deliveries were
The Wallace Clark report covering spare due, assembled equipment was complete on
parts for airborne radio and radar sets was 19, but no spare parts had been accepted,
issued 27 November 1942. It reviewed cur- and in 62 out of 66 cases in which sets were
rent contracts for a number of important in various stages of completion, the spare
sets, compared the actual rates of delivery parts were behind the sets on the basis of
of spare parts with those called for, and delivery. The report cited reasons for the
137
Ltr, Sig Officer, AFHQ to CSigO, 18 Apr 43.
lag: the necessity of supplying initial equip-
SCIA File 13, Matejka Rpts. ment to task forces; the shortages of ma-
138
Ltr, O/C ARL to CG AAF, 12 Jun 43, sub: terials which led to the slighting of spare
Rpt of visit of Yeager to NATO, Ninth Air Force,
and ETO, 6 Apr 43-7 Jun 43. SCIA File 75,
parts in favor of complete sets; and the fact
Yeager Rpts.
139 141
For discussion of spare parts policy and prob- Wallace Clark Rpt 29, Spare Parts for Air-
lems, 1941 to late 1942, see above, pp. 324-28. borne Sets, 27 Nov 42. SigC 413.44 Spare Parts
140
For Ordnance difficulties with spare parts, see No. 4, Dec 42.
142
Harry C. Thomson and Lida Mayo, The Ordnance Wallace Clark Rpt 30, Spare Parts for Ground
Department: Production and Distribution, a forth- and Vehicular Sets, 28 Dec 42. SigC 413.44 Spare
coming volume in this series. Parts No. 4, Dec 42.
528 THE SIGNAL CORPS
that spare parts groups could not be in- ing them that it was urgent and that he had
spected and shipped until all items compris- to have results. Colton pointed out that
ing a group were on hand. This factor illus- neither contracting officers, contractors, nor
trated the "for-want-of-a-nail" nature of expediters had been as much concerned to
much of signal supply. One small part in obtain delivery of spare parts as of complete
critical supply could hold up delivery of a equipment, and added that undoubtedly
much-needed piece of equipment or spare directives from his office in the past had led
parts group for weeks or months. The Wal- to that attitude. However, the time for that
lace Clark report recommended among was past. Over $900,000,000 worth of
other things that this method of contracting equipment had already been delivered—it
for spare parts groups be changed, and that was essential to keep it in service.144
the Inspection Agency be authorized to ac- The Wallace Clark researchers had
cept and certify for payment such parts as pointed out that there was no single place
were fabricated and ready for shipment, al- in the Signal Corps where they could get a
though the whole spare parts group might complete picture of the spare parts problem,
be incomplete. and had listed five agencies involved: the
General Colton was quick to follow up Laboratories, the Procurement and Engi-
the Wallace Clark recommendations. He neering Section of the Philadelphia Signal
had already emphasized to all signal supply Corps Procurement District, the Storage
agencies that a change of policy was in ef- and Issue Agency, the Signal Corps Shops
fect, that equipping task forces initially was Branch, and the Maintenance Section of the
no longer as important as maintaining Signal Corps Ground Signal Service.145
equipment already in the field. On 28 No- They might well have added that there
vember he notified the Wright Field Signal were too many agencies outside the Signal
Corps Procurement District to get busy im- Corps having a proprietary interest: for ex-
mediately reviewing all airborne sets to find ample, the manufacturers, the commanding
out what spare parts the men in the field re- generals of the theaters, the Army Service
quired for repairing their equipment, tak- Forces, and numerous top-echelon planners
ing the most-needed sets first; to find out and requisitioners.
what had been done to supply the parts, Meanwhile, the ASF directed the Signal
and, if it had not yet been done, to do it at Corps to participate with the other techni-
once; and to report to him within one cal services in a spare parts study, covering
month what had been accomplished.143 On procedures used for estimating require-
31 December he told the directors of the ments, storing, and distributing parts.146 The
Signal Corps Ground Signal Service, the Signal Corps set up a special project within
Signal Corps Aircraft Signal Service, and 144
Ltr, Chief of Sig Supply Sv to Dir of SigC
the Philadelphia Signal Corps Procurement Ground Sig Sv, Dir of SCASS, and CG Philadel-
District to "give this matter your personal phia SigC Proc Dist, 31 Dec 42, sub: Spare parts
for SigC equip. SigC 413.44 Spare Parts No. 4,
attention," the military method of inform- Dec 42.
145
Wallace Clark Rpt 30, p. 17.
143 146
Ltr, Chief of Sig Supply Sv to CG Wright (1) Memo, Gen Styer, CofS ASF, for CSigO,
Fld SigC Proc Dist, 28 Nov 42, sub: Spare parts 28 Dec 42, sub: Spare parts. SigC 413.44 Spare
groups rqmts. SigC 413.44 Spare Parts No. 4, Parts No. 4, Dec 42. (2) Gerard, Story of Supply
Dec 42. in the Signal Corps, Pt. II, p. 40.
THE TECHNICAL SERVICE A SUPPLY SERVICE 529
its control division which started prepar- and 584. From the Signal Corps main-
ing the report called for by the ASF. It tenance viewpoint, it was desirable to have
found twenty-two factors which had to be as many spare parts as possible in the field
considered in requisitioning spare parts.147 with the operating sets. For example, each
Before it could forward its report, new di- gun battery and each searchlight platoon
rectives from the Army Service Forces ought to have complete maintenance equip-
broadened the base of inquiry to include ment accompanying each set, assuming of
stock control. The ensuing three months course that there were enough maintenance
were a grueling period, with every Signal men trained to use it. On the other hand,
Corps agency even remotely concerned with as the Army Ground Forces and the Anti-
the matter pressed on every side for answers aircraft Command pointed out, tactical
to a problem which was rapidly assuming considerations demanded that units be kept
nightmarish proportions. The files grew mobile, carrying as little maintenance
thicker with surveys, suggestions, and coun- equipment as possible. The distribution rep-
terproposals. resentatives wanted a spare parts program
That there were as many points of view that would achieve the objectives sought by
on the spare parts problem as there were both the maintenance and tactical plan-
interested agencies had been demonstrated ners. Obviously, this was very difficult, and
in February 1943, at conferences held in the best approach they could suggest was
the Office of the Chief Signal Officer and to provide each radar set initially with the
attended by representatives of the Services minimum amount of spares for first- and
of Supply, the Army Ground Forces, the second-echelon maintenance, and to place
Antiaircraft Command, the Antiaircraft all remaining spares and maintenance
Artillery Board, the Camp Evans Signal equipment either in a rear echelon or in
Laboratory, the Fort Monmouth Signal depot stock.
Laboratory, and the Monmouth Procure- The procurement representatives offered
ment District. The specific subject under still another view. From the standpoint of
discussion was the spare parts and vehicle facilities and materials, spare parts ought to
programs for radars SCR-268, 545, 547, be reduced to the very lowest point consist-
ent with minimum adequate maintenance,
147
Gerard, Story of Supply in the Signal Corps, because of the many critical items and ma-
Pt. II, pp. 45-46. They were: catalogue of spare terials required in their manufacture. And
parts, with positive identification to avoid duplica-
tions; inclusion of same parts used in two places finally, from the production point of view,
in same unit, or used in more than one unit; ac- any revisions either upward or downward
curacy of record showing stock on hand; minimum meant a disruption of production. Once a
and maximum lists; quantity used; quantity on
hand all over; present shortages represented by back
basis of decision was reached, procurement
orders; information from laboratories; information officials begged that it be allowed to stand,
from manufacturers; information from repair shops because constant changes cost much money,
on experience; information from Air Forces; in-
formation from Ground Forces; supplying of new time, and trouble.148
depots; quantity of complete units contemplated to In March the ASF issued its consolidated
be put in operation; filling the pipeline (distribu-
148
tion lag) ; breakage; shipping losses; losses in thea- 8th Ind, Actg Chief of Electronics Br OCSigO
ters (combat factors) ; usage in different climates to CG SOS, 2 Mar 43, on Ltr, CofS Hq AAG to
and/or temperatures; wearing out of equipment; CG AGF, 10 Nov 42, sub: Change in T/BA 44.
salvage; and British experience. SigC 413.44 Gen 4, 1943 (RB 1926).
264-211 O - 78 - 35
530 THE SIGNAL CORPS
report on spare parts for all the technical It was at this point that the Signal Corps
services. It noted that the Signal Corps, in- dilemma—the conflict between technical
sofar as it was concerned, had already taken specialization and the "frozen-design" con-
steps to alleviate many of the difficulties. cept necessary for mass production—came
For example, it noted that the Signal Corps into sharp focus once more. There could be
maintenance parts annexes formed a part no argument about the desirability of stand-
of the contract specifications, which in turn ardization. The only question was how far
were the basis for determining parts re- it could go without colliding head on with
quirements. These annexes were lists of some other equally desirable objective.
maintenance parts which, in the judgment Certainly such badly bungled cases as that
of the laboratory engineers and the manu- of headset HS-30 could be cured. The
facturers, were considered necessary for one HS-30 was a relatively simple device. In a
year's maintenance. They represented the zealous attempt to spread the work among
most expert guesses available until field ex- small contractors, Signal Corps contract-
perience reports could come in. In January ing officers had divided the order for the
1943 the Signal Corps had directed the re- headsets among ten different manufac-
pair shops to prepare quarterly reports, and turers, who produced ten different electro-
had instructed each signal unit having a acoustic elements, each of which met the
repair section and each depot performing specifications but none of which was inter-
repairs on signal equipment to send in tem- changeable with any other. This meant that
porary reports on items requiring excessive ten different types of maintenance parts
maintenance. From these, the laboratories groups had to be obtained and distributed
would be able to tell, for example, whether to all using units in the field.150
the dynamotor armatures and bearings To prevent such absurdities of duplica-
they ordered as spares were actually used tion, the Signal Corps had set up the Signal
by the field repair organizations or whether Corps Standards Agency, which was work-
repairmen simply replaced the entire dyna- ing with the War Production Board, the
motor, and whether ordering three sets of American Standards Association, the Navy,
every fixed capacitor used in a radio set was and industry, to standardize components.
necessary, or whether certain capacitors The agency had already completed a pre-
failed more quickly than others, resulting in ferred list of vacuum tubes and mica capac-
excesses of some kinds and shortages of itors and was at work on lists of fixed and
others. variable condensers, ceramic, paper and
The most important finding of the ASF electrolytic capacitors, and meters. From
report struck hard at the lack of standard-
now on, before any new items of signal
ization, both of individual items of equip-
equipment were put into production, the
ment and of components to permit inter-
changeability of parts between various items contractors' samples of components would
of equipment. It called this lack of stand- be submitted to the Standards Agency for
ardization "the one major factor impeding approval.151 Commendable though these ef-
the successful accomplishment of the sup- 150
ply of spare parts." 149 151
Ibid., pp. 1-2.
Incl, Comments on Report 98, with Ltr, Col-
149
ASF Control Div Rpt 98, Spare Parts for Sig- ton to CG ASF, 8 Apr 43. sub: Spare parts for Sig
nal Equipment, Mar 43, p. 1. ASF File, DRB AGO. equip. SigC 475.7 Sig Equip.
THE TECHNICAL SERVICE A SUPPLY SERVICE 531
forts were, they could accomplish only lim- ments were far less successful. The Signal
ited reforms. The roadblocks erected by the Corps Aircraft Signal Service agencies at
desire of the using arms for flexibility of de- Wright Field had made good progress, both
sign were based upon sound tactical rea- in determining what parts were needed and
sons, but they illustrated once more the in building up a supply of them. But the
problems the technical services faced in try- organizations under the Signal Corps
ing to reconcile the basic incompatibility be- Ground Signal Service at Fort Monmouth
tween the two points of view. seemed to be lagging.154
The ASF report did not specifically dis- Some weeks earlier, Colton had set some
cuss this point, but by inference it acknowl- of his best officers to work on a comprehen-
edged its existence by the proposal it ad- sive "Maintenance Plan" to establish poli-
vanced for solution of the spare parts prob- cies for procurement, distribution, and use of
lem. The remedy sought to "put the con- repair parts. On 1 May this plan was pub-
tracting officer, supplier, distributor, and lished. It embodied the best suggestions
user of maintenance parts upon a basis of from the Signal Corps' Control Divi-
mutual understanding" by publishing a sion study, the various Wallace Clark re-
tabular list of replaceable parts which be- ports, and the ASF study. It went to
came a maintenance list when edited, ap- the Signal Corps Aircraft Signal Service,
proved, and stock-numbered, and which the Signal Corps Ground Signal Service,
provided the basis for estimating require- the Signal Corps Eastern Signal Service,
ments, initiating procurement, and requisi- and the various branches and divisions of
tioning parts in the field at various eche- the Office of the Chief Signal Officer, and
lons.152 It appeared to be a workable ar- it stated specifically what each agency
rangement, and actually it or something should do.155 As the weeks slid by and the
very like it was used thereafter throughout spare parts situation improved only slightly,
the war, becoming the basic element upon the fires that were being built under every
which maintenance planning depended.153 organization straight down the line were
But by itself it was still not enough. growing hotter.
At about the same time that the ASF re- But it was becoming apparent that the
port reached General Colton's desk, he had spare parts problem involved factors that
before him a fifty-page report from the Wal- could not be controlled on the home front
lace Clark management engineers which re- by the technical services alone. It was as if
viewed the many programs under way. The a merchant had set out to furnish trade
Signal Corps was attacking the spare parts goods for an exploration party without ad-
problem on all fronts, with varying degrees vance information as to whether beads,
of success. Identification—proper descrip- knives, or bolts of calico were required.
tion, stock-numbering, and published lists
154
of spare parts—was proceeding well. Ef- Wallace Clark Rpt 35, Mar 43, pp. 20, 30,
39-40. SigC 413.44 Spare Parts No. 5, Jun-Jul 43.
forts to obtain better estimates of require- 155
Memo, Chief of Sig Supply Sv for All Con-
cerned, 1 May 43, sub: Gen Maint Plan (for
152
ASF Rpt 98, Incl, Proposed Plan for Spare equip supplied by SigC), and the following Incls:
Parts Determination and Issue. (1) Gen Maint Plan, Sec. I. (2) Gen Maint Plan,
153
Cerruti, Historical Narrative of the Philadel- Sec IL (3) Memo, sub: Maint lists for SigC equip.
phia Signal Corps Procurement District, p. 443. SigC BC 475 Spare Parts (Maint Equip, Vol. 1).
532 THE SIGNAL CORPS
The ultimate consumers of spare parts were W700-32-43.159 It provided for "continu-
the overseas forces, yet the technical serv- ously analyzed" reports from the field as to
ices had little idea of how parts were used or the actual end use of spare parts. It also
distributed overseas. The Wallace Clark re- enunciated an official policy: spare parts
port had called this lack of detailed knowl- "easily broken, rapidly worn, or otherwise
edge of activities in the overseas base depots required for frequent replacement" would
and repair echelons the great deficiency in be furnished integrally with each item of
the distribution system. "It is not known equipment, and spare parts for all echelons
what organizations are doing in practice, of maintenance would be delivered simul-
how they are being set up to receive stock taneously with equipment deliveries.
and to distribute repair parts, and what the No one was naive enough to think that
real needs and problems are." Field requisi- a mere enunciation of policy could solve the
tions were made "not on the basis of spare spare parts problem. But at least it set up
parts groups or maintenance factors, but on the ground rules and, more importantly,
the judgment of the supply officer as to his made it clear that they applied to every-
need," and 30-, 60-, or 90-day supply needs body. From now on, the conflicting view-
of task forces were also computed "on a points and practices of overseas command-
basis differing from the procurement com- ersand z o n eofinteriorsupplyorganizations
putations." 156 Thus no matter how carefully could be channeled into the same lines of
the Signal Corps supply system at home action.160
might calculate the "probable" needs, the The Fiscal Year Summary
"actual" overseas needs, real or imagined,
Thus, as the fiscal year ended on 30 June
could throw the complete system into chaos. 1943, the fever chart of the Signal Corps
Obviously, more inspection teams and more supply organization told little about the
carefully compiled overseas reports were actual state of the patient's health. Looking
needed. well, looking ill, it fluctuated from crisis to
The Army Service Forces and the War crisis, and could be evaluated as either very
Department moved to fill the breach. On good or relatively poor, depending upon the
15 May the ASF issued Circular 31, which criteria used. On the one hand there were
covered in detail the policies for spare parts the persistent reports of shortages overseas,
lists.157 It followed this with a series of let- and the production lag in certain important
ters to the technical services devoted to spe- classes of equipment. But the vigorous
cial aspects of the problem.158 On 6 July the efforts to overcome these difficulties were en-
couraging, and seemed to be about to pay
War Department issued Memorandum
off.
156
Wallace Clark Rpt 35, p. 47.
The last half of the fiscal year had begun
157
(1) Gerard, Story of Supply in the Signal on a highly optimistic note. The Signal
Corps, Pt. II, p. 48. (2) ASF Cir 31, 15 May 43, Corps had not only met the current require-
Spare Parts Lists.
158
(1) Memo, Maj Gen LeR. Lutes, Dir of Opns 159
WD Memo W700-32-43, 6 Jul 43, sub:
ASF, for CofOrd et al, 4 Jun 43, sub: Info pertain- Spare parts policy for all U.S. Army troops equip
ing to maint of equip. (2) Ltr, Maj Gen Lucius except equip proc by AAF. SigC 413.44 Spare
D. Clay, Dir of Mat ASF, to QMG et al, 11 Jul Parts 5, Jun-Jul 43.
43, sub: Proc, storage and distr of spare parts. 160
For discussion of the spare parts problem in
Both in SigC 413.44 Spare Parts 5, Jun-Jul 43. 1944-45, see Thompson and Harris, The Outcome.
THE TECHNICAL SERVICE A SUPPLY SERVICE 533
ments of the Army Supply Program (ASP), the basic difficulties. These troubles lay
but had exceeded its November procure- partly in the multiplicity of types of equip-
ment objective of $ 141,000,000 for a total of ment and their growing complexity, partly
$174,000,000 161 A few days later came even in the questionable policy of keeping sup-
better news. The War Department an- ply and development combined under
nounced that between January and Novem- Colton's command in the headquarters
ber 1942 the Signal Corps had far out- organization.
stripped all other components of the Army Thus General Colton, who was in a bet-
Service Forces in percentage increase of ter position than anyone else to assess the
dollar volume. The figure for the ASF as real value of the statisticians' reports,
a whole was 337 percent, for the Signal warned on 12 December 1942 that although
Corps, almost four times as much: 1,328 from an over-all standpoint the Signal
percent.162 From October to November the Corps program appeared to be progressing
Signal Corps percentage of increase was very well, the same could not be said of
30.5 percent, compared to an average in- schedules for all items. In particular, ground
crease of 13.4 percent for the technical radio equipment and radar were trailing.
services as a whole.163 In the case of ground radio, the Signal
Taken at face value, these statistics made Corps was behind schedule by $15,000,000,
Signal Corps supply look very good. But most of it for SCR-188's. This set employed
percentages reckoned in dollar value were a transmitter used also in airplanes and
deceptive. In terms of Army needs and ob- tanks, and since both these items had higher
jectives, the picture was spotty; in some priority than ground equipment, the trans-
places, dark indeed—especially in regard to mitters for the SCR -188 were fallin
spare parts, radar parts above all. The fact hind. Also, until August, the Signal Corps
that production in late 1942, in terms of had supposed that it would be required to
dollars, approximately equaled the dollar have by December only the 2,407 SCR-
value of the demand then existing meant 188's already scheduled, but in August the
little when much of the equipment in the scheduled number was boosted by over 50
depots and in the hands of troops could not percent.
be used because it lacked essential com- Radar was a different story, one which
ponents 164 Furthermore, the November pointed up the inequity of comparing ASP
1942 drive for production was an artificial "requirements" with the amounts of equip-
stimulus that created a temporary upsurge ment a technical service could provide. Put
in dollar volume of deliveries without curing another way, the ASP was a long-term fore-
cast of Army needs, which took no account
161
(1) Memo, [Styer] for Somervell, 7 Dec 42. of the factors impeding or accelerating pro-
ASF Control Div, CG Reading File. (2) For the duction of individual items. In terms of dol-
discussion of the November 1942 production drive,
see above, pp. 335ff. lars, the 1942 ASP called for radar items in
162
Signal Corps Information Letter, No. 14 the amount of $270,146,000. Up till 30
(January, 1943), p. 42.
163
WD Monthly Progress Rpt, Sec 1, Procure- November only $146,903,000 worth had
ment, Nov 42, p. 5. ASF File, DRB AGO. been delivered. Of the $82,000,000 defi-
164
MS Comment, Col Byron A. Falk, Ret., in
ciency, almost half was for the SCR-584,
Memo for Deputy Chief Historian, OCMH, 27
Mar 52. OCMH. a gun-laying radar which had not yet been
534 THE SIGNAL CORPS
fully developed, but which the using serv- were apparently in good supply: airborne
ices had demanded the moment they saw the communication equipment for the Air
first test model. Tooling for production Forces, for example. Radar was more
alone involved $10,000,000 worth of ma- abundant, especially for airborne use.
chine tools. The ASP requirement had been Radios for tanks were in excellent supply,
figured at 461 sets, although there had and the situation respecting plant equip-
never been any possibility of getting any ment was sound. But there were weak spots
of them in 1942. The remainder of the ASP in ground signal equipment and in photo-
deficiency was largely in the SCR-270 and graphic supplies, the latter because esti-
271 radars, although by January 1942 the mates had been too conservative and man-
Signal Corps had supplied all the sets then ufacturing facilities hard to obtain. Ground
scheduled for delivery during the entire signal equipment was lagging for several
calendar year. Later, the using arms had reasons, the most important being that
clamored for a great many more sets, but tables of equipment did not reflect all the
by that time the production lines were down items that theater commanders were de-
manding.168 Such extra items did not ap-
and it took time to get them started again.
pear on the Army Supply Program.
Thus on the face of it, the Army Supply
Although the Signal Corps led all the
Program showed by December that the Sig- other technical services in the increased
nal Corps had supplied only three fourths of amount of equipment made available for
the number ultimately and belatedly re- distribution during June 1943 (with a per-
quired for the year. Colton said, "That is no centage increase of 21.6 percent, repre-
criticism of anybody, but when these re- senting a dollar value of $100,896,000),169
quirements were set up, few people had seen General Somervell was not pleased with the
radar, and many of them who had seen it trend of progress. The May monthly prog-
didn't believe it." 165 ress report indicated large decreases in the
Six months later, at the end of June 1943, amount of items issued to the using arms,
the radar picture had brightened consider- and increases in the number of items going
ably, although only the earlier models were to storage. This meant that no matter what
in full production, distributed, and in use the tonnage rates and dollar-value statistics
by troops. Later models were in production, seemed to indicate, the using arms either
and still more recent ones were in the de- were not getting the kinds of equipment
velopment stage.166 Radar and radio ship- they needed, or the assemblies coming off
ments had increased twelvefold over the the production line and going to the depots
early 1942 figures, and now averaged
$250,000,000 a month.167 Nearly all items
the National Defense Program, Pt. 19, p. 77531.
165
Supply Sv OCSigO, Review of Production By summer about 200 SCR-268's had been delivered
Plans, 12 Dec 42, pp. 3-4, 17-19, 20, 25, 30. SigC in excess of tactical requirements. Memo, Conf on
DS 400.192 Prod, 1942-43. Spare Parts for Radio Set SCR-268, 13 Aug 43,
166
Memo, Col Lanahan, Planning Dir OCSigO, signed by Capt C. M. Hutchins, Supply Coord Br,
for ACSigO, 20 May 43, sub: Resume of status of 16 Aug 43. SigC 413.44 SCR-268-12F, Jun 43,
supply of Sig equip, U.S. Army. SigC EO Memo No. 25 (RB-2011).
168
for CSigO. Memo cited n. 166.
167 169
Special Committee, 77th Cong, 2d Sess, Hear- WD Monthly Progress Rpt, Sec. 2-A, Dis-
ings before the Special Committee Investigating tribution, 30 Jun 42. ASF File, DRB AGO.
THE TECHNICAL SERVICE A SUPPLY SERVICE 535
170
were not complete. The Signal Corps was Procurement, too, was falling off again
embarrassed in May when some organiza- rather seriously as the fiscal year closed in
tions were unable to move overseas as mid-1943. War factories serving the Signal
scheduled because of shortages of Signal Corps were laying off workers and discon-
Corps equipment. They included Company tinuing night shifts. Much of the fault could
C of the 62d Signal Battalion; the 210th be traced to delay in placing contracts. The
Signal Depot Company; the 233d Signal Signal Corps had a large backlog of unob-
ligated funds—until the first of May it
Operations Company; the 909th Signal
"had not spent a dime of the money re-
Depot Company, Aviation; the 898th Sig-
ceived the previous July"—and delay in
nal Depot Company, Aviation; and the 7th, translating funds into contracts would in-
11th, and 14th Airdrome Squadrons. This evitably mean a slowing down of deliveries.
list did not include other units whose read- It still took forty days to process an order
iness dates had been deferred because of through the Philadelphia Signal Corps Pro-
unsatisfactory T/BA and training status re- curement District.172
ports, which could not be submitted until All these incidents pointed up the fact
enough equipment was on hand for train- that General Olmstead's many reorganiza-
ing purposes. Items in short supply consisted tions had not yet succeeded in providing a
principally of telegraph central sets, ter- completely efficient and co-ordinated head-
minal equipment, and maintenance and tool quarters supply staff, but there is no indi-
equipment.171 cation from the records that he was aware
that his career was about to founder,
170
Incl 4, Memo, Somervell for CSigO, 13 Jun ostensibly upon the rock of supply.
43, sub: May prod, with Memo, CSigO for CG
ASF, 18 Jun 43, sub: May prod. SigC 400.12
Proc 1943. (2) Log entry, 29 May 43. Deputy CSigO Folder,
171
(1) Memo, Lanahan for CSigO, 19 May 43, 1942-45, pp. 183, 197. SigC Hist Sec File.
172
sub: Orgns on movement orders deferred due to Log entries, 21 May and 17 Jun 43. Deputy
shortage of Sig equip. SigC EO Memo for CSigO. CSigO Folder, 1942-45, pp. 183-84.
CHAPTER XVI
matters in the theaters overseas. Between in this country which must take cooperative
the Signal Corps roots at home and the action that the remoteness is almost com-
branches abroad the connecting trunk plete." He added that there was "lack of
seemed at times tenuous, at times twisted understanding and appreciation of Signal
and knotty, at times, indeed, almost severed. Corps problems in the higher staff levels
Defects repeatedly appeared in the flow of because no Signal Corps officers are made
signal supplies and in the exchange of sig- available for duty on the General Staff."
nal information between the field and O'Connell cited in particular the North
Washington. African theater staff with no Signal offi-
Additional problems developed out of the cers, but with several Ordnance officers. In
fact that the communications scene was Washington the War Department General
changing from month to month almost Staff agencies, such as OPD, had very few
faster than men could comprehend. As Signal Corps officers assigned to them. Be-
counterparts to the new developments in cause of a lack of signal-minded officers in
the laboratories and factories at home, there OPD and because of the fact that Signal
were now springing up in the field surpris- Corps units were broken up into three cate-
ing applications—in radar, in radio relay, gories (Army Ground Forces, Army Air
in carrier communication, in electronic Forces, and Army Service Forces), Maj. E.
Countermeasures. The impact of mecha- McDonald, Chief of General Olmstead's
nized mobile war on the ground and in the Supply Operations Branch, asserted that it
air, the effect of new and better electronic had become "virtually impossible for one
signal equipment upon the new mode of agency to know the whole story about a
warfare, the countereffect of new combat Signal Corps unit requested by a theater."
conditions upon the application of the Pursuing this example in support of O'Con-
equipment—all led to new needs and new nell's remarks, McDonald explained fur-
demands, sudden and unanticipated. Ob- ther :
serving officers who could make themselves . . . the theater commander's request for an
believed when they got back to Washing- Army Ground Force unit is never referred to
ton were needed in the field, as Colonel the Chief Signal Officer, nor is a request for
Tully pointed out after the North African a Signal Corps unit with the Army Air Forces.
Requests for Signal Corps casuals may never
campaign.7
be referred to the Signal Corps, and in some
In the summer of 1943 Colonel O'Con- cases requests for Signal Corps Army Service
nell commented that there were basic or- Force units are never referred to the Office of
ganizational reasons why both the supply the Chief Signal Officer but are referred to the
of Signal Corps items and the exchange of Army Service Forces headquarters, which
makes the final decision without reference to
information were so difficult. "There are
any agency in the Office of the Chief Signal
so many layers of different organizations," Officer.
he said, "between the man in the front in
Thus other agencies, such as the ASF
the theater and the complex organization
often took action in signal matters while
7
Ltr, Tully to Meade, 21 Sep 43. SCIA File 23, the Signal Corps itself remained unin-
(see Bibliographical Note), Tully Rpts, 1. Tully, formed. To bypass such organizational
who had been II Corps Signal Officer during the blocks, which some may say inhere in the
North African fighting, became Deputy Chief Signal
Officer, AFHQ, in mid-1943. complexities of modern life and modern
SIGNAL CORPS POSITION IN MID-1943 539
warfare, O'Connell urged a direct exchange Ground Forces and the Army Service
of officers to keep the Signal Corps at home Forces. What struck Rives most was the
and the Signal Corps in the field better in- dual supply system in the Army: on the one
formed. "Bring back key staff officers from hand, the Army Service Forces supplying
the theater," he recommended, "for short the Army Ground Forces; on the other, the
tours of duty to familiarize them with or- Air Service Command supplying the Army
ganizations and methods of procedure in Air Forces. Units of the Signal Corps op-
[the] U.S.," and use "trained liaison offi- erated in both, happily in the Army Serv-
cers on a bi-monthly or quarterly basis to ice Forces, unhappily in the Air Service
keep theater staffs informed of personnel Command. Those serving in the latter were
and equipment plans." 8 orphans, he declared, their parent branch,
Since the first of the year, after signal the Signal Corps, having no control over
communications in North Africa became them, and their adopted parent, the Air
stabilized, a procession of Signal Corps of- Forces, looking upon them very much as
ficers had been traveling to that theater to stepchildren. Such units, he recommended,
report home on signal matters. By the sum- should be transferred outright to the Army
mer's end so many observers had come that Air Forces.10
overworked officers in the field were getting Colonel Rives found no very dire defects,
"fed up with visitors," as Colonel Tully however. Neither did Colonel O'Connell nor
put it. Tully added that their tendency to his companion, Dr. R. S. Glasgow, a radio
report chiefly the troubles which unde- consultant with the Army Air Forces. The
niably harassed the field organization comments of O'Connell and Glasgow
should be weighed against the fact "that touched chiefly matters of supply and main-
there are a lot of things that are going all tenance, training, organization, and chains
right." 9 of command. "There has been a very defi-
The visitors included Colonels O'Con- nite development of communication con-
nell and Rives (both from the Signal Corps sciousness on the part of tactical command-
supply organization in Washington) and ers and their staffs, as to the vital nature
General Olmstead himself. Colonel Rives of fast, reliable signal communications,"
surveyed the signal situation touching the O'Connell reported. But "uncertainty and
Army Air Forces in England and North indecision," he added, "were observed gen-
Africa during May and June. He had erally among theater signal staffs as to the
agreed to concentrate on the air view since proper channels of correspondence and ac-
O'Connell was spending two months to tion on technical matters and channels, and
look into the state of signals in the Army command or policy matters and channels."
Communications were working, thanks not
8
(1) Memo, O'Connell for CSigO, 12 Aug 43, so much to the system as to the "zealous
sub: Observations and conclusions on certain mat-
ters of policy and orgn as a result of temporary devotion to duty ... of all signal person-
duty in North Africa; (2) Memo, Maj McDonald nel," said Dr. Glasgow, who commented
for Col Guest, 26 Aug 43, sub: Present procedure that "it is my opinion that their initiative
and responsibilities of CSigO with regard to com-
plaints noted in O'Connell rpt to CSigO. SCIA 10
File 113, O'Connell and Glasgow Rpts. Ltr, Rives to CSigO, 21 Jul 43, sub: Observa-
9
Ltr, Tully to Meade, 21 Sep 43. SCIA File 23, tions in England and North Africa. SCIA File 84,
Tully Rpts, 1. Rives Rpts.
540 THE SIGNAL CORPS
and effort did much to offset some of the rector of Air Communications during the
limitations and inadequacies" which first two years of the war, himself admitted
O'Connell described.11 in the spring of 1943 that there was need
On the evidence of these observations, for a Chief Signal Officer of the Army with
therefore, it appeared that there were some superior powers and control. This lack, he
faults in Army signals. Signal Corps officers asserted, "is one of the biggest faults of the
14
since the March 1942 reorganization chafed whole Army organization."
at their situation, especially at the conse- If to some these pleas sounded monoto-
quences of that reorganization, which nously like similar cries from the chiefs of
placed their Corps under the ASF. The such Corps as Medical and Ordnance, who
Chief Signal Officer could not approach di- sought direct control over their bailiwicks
rectly either the Air Forces or the Ground also,15 to others the Signal Corps needs
Forces; he had to communicate with them seemed unique. For example, Dr. Bowles
by way of an indirect channel, through the informed the Secretary of War: "It is my
ASF headquarters. Quick action and au- belief that sooner or later the Army will be
thoritative control in matters of air or forced to recognize communications not
ground signal operations Olmstead found only as a service but a state of mind that
to be hampered at best, impossible at worst. must pervade all planning, as well as oper-
Olmstead and his Signal Corps officers were ations, and consequently as a field of such
not alone in the dour view they took of importance that it warrants unique recog-
their situation. Maj. Gen. George V. nition." 16 Brig. Gen. John A. Hull, of OPD,
Strong, Assistant Chief of Staff, G-2, rec- made the same point in presenting his views
ognized that there was trouble in signals to a board appointed to study army-wide
when he said in late 1942 that the Corps' communications problems in the spring of
difficulties lay in "the system they are work- 1943: "The Medical Corps is a service; the
ing under." 12 14
Proceedings of Board to Investigate Commu-
Dr. Edward Bowles, electronics special- nications, Tab S, p. 5. Commenting on the lack
ist and adviser to the Secretary of War, of strong signal control, Marriner said further, "It
vigorously underscored the lack of com- is pretty near unbelievable that of all our enemies
and of all our allies, even including our Navy, they
munications leadership in the Army and es- have, in fact, a director of communications or di-
pecially in its Air Forces. The communica- rector of signals, or what not, who is responsible on
a very, very high level." But in the U. S. Army
tions of the latter arm had been poor in the there was no signal authority above the ASF; and
13
North African campaign. An AAF spokes- the AAF, Marriner added, objected on principle
to submitting to communication directives from the
man, Colonel Marriner, who was the Di- ASF.
15
The Chief of the Medical Corps did in fact
11
Memo, O'Connell for Deputy CSigO AFHQ, win, toward the war's end, a fight he had made
28 Jul 43, sub: Observations of SigC orgn and to obtain direct access, independent of the ASF,
opns in NATO by O'Connell and Glasgow. Tab to the Chief of Staff and the Secretary of War on
D, SCIA File 113, O'Connell and Glasgow Rpts. certain matters touching the medical care of troops
12
Log entry, 21 Oct 42. Deputy CSigO Folder, and the employment of professional medical people.
1942-45, p. 79. SigC Hist Sec File. Maj James A. Huston, Time and Space, Ch. II,
13
(1) Memo, Bowles for Arnold, 16 Jun 43, "Reorganization for Logistics," pp. 86, 155. Draft
sub: AAF Com. OCS (WDCSA) 676 (28 Dec 43). MS prepared in OCMH.
16
(2) Craven and Cate, The Army Air Forces in Memo, Bowles for SW, 26 Jun 43, sub: AAF
World War II: II, pp. 127, 169. Com. OCS (WDCSA) 676 (28 Dec 43).
SIGNAL CORPS POSITION IN MID-1943 541
Quartermaster is a service; the Signal Corps Headquarters Crisis over Supply
has a dual function. It is an operating and Control Problems
agency and a service. It is the operating
side that I am interested in. . . ." 17 To this The Problem of Supply
Signal Corps officers could say "amen," General Olmstead set out on his inspec-
praying too that it not be forgotten that tion in March 1943. Problems unquestion-
the Signal Corps was an arm as well, shar- ably existed in the Signal Corps, particu-
ing that distinction with the Engineers alone larly in the field of supply. In procuring the
of the other services. right kinds of equipment, in sufficient quan-
Having in mind the impediments hinder- tity and on time, the Signal Corps too often
ing the direct operational control which he continued to lag. "Signal Supply was per-
desired over Army communications, the haps the most critical problem of the Chief
Chief Signal Officer and the chief of his Signal Officer [Matejka] throughout the
Signal Troops Division, Brig. Gen. Frank Tunisian Campaign," concluded the offi-
C. Meade, had taken off on 20 March 1943 cers who served as the historians of the
for a grand tour of inspection. They trav- AFHQ Signal Section.20
eled 28,000 miles to many of the theaters— In Washington the drive for production
North Africa, the Middle East, China- late in 1942 had produced gratifying re-
Burma-India. "In spite of the vision we had sults, but only for a while, principally in the
of these problems," General Olmstead said, last weeks of that year. The utmost efforts
"it was necessary to go out and see the sit- to improve supply under the existing or-
uation to realize how great the problems ac- ganization did not maintain a consistently
tually were." 18 More specifically Olmstead satisfactory level of production. They did
not clear away basic difficulties. One of
remembered the reply he had received the
these was the fact that Signal Corps supply
year before when he objected to the March
did not receive the full-time attention of its
1942 reorganization—the reply that the chief. It had remained harnessed with re-
Army must try out the reorganization and search and development since late 1941.
that, if it proved unworkable, adjustments For one of General Olmstead's first acts in
might be made. When adjustments seemed office a year and a half earlier had been the
indeed needed, Olmstead had told restive combining of supply and development un-
General Staff and Signal Corps officers, "I der General Colton.
don't want to make an issue of the matter Colton was a research and development
until I go out and see how it [the reorgani- specialist, and a good one. But supply, the
zation] affects the troops that are fighting." Army insisted, was the dominant demand.
This was the central purpose of his trip in It is of course questionable whether a good
the spring of 1943.19 research director can be expected to com-
17
bine his talent and preference for develop-
Proceedings of Board To Investigate Communi-
cations, Tab W, p. 5.
ment with the driving, mountain-moving
18
CSigO, Annual Report, 1943, pp. 65-66.
19 20
Proceedings of Board To Investigate Communi- Sig Sec, AFHQ, History of the Signal Section
cations, Tab P, p. 2. For General Meade's com- Allied Force Headquarters, 24 July 1942-10 No-
ments relative to the trip, see also Tab M, p. 20. See vember 1945 (1945), p. 40. SigC Hist Sec File,
also p. 59, above. A47-200 Drawer 15.
542 THE SIGNAL CORPS
GENERAL OLMSTEAD (seated) discusses signal operations in North Africa, April 1943.
proclivities of an effective production chief. During 1942 and early 1943 Signal Corps
Rapid mass production inevitably clashes experience continued to indicate that there
with the slow refinements of perfected re- might be intrinsically sound reasons for
search and development. The previous separating supply from research and de-
Chief Signal Officer, General Mauborgne, velopment, putting the latter task into the
had encountered just the same problem and hands of a research-minded officer and giv-
had to some degree fallen a victim of it. He ing supply to one who was familiar with and
knew research. He knew the business of de- favorable to the conditions of mass pro-
signing intricate military equipment, and curement, one who did not especially sym-
he was sympathetic with doing the develop-
pathize with the niceties of perfected de-
ment well and getting a fine product on
velopment. Besides, Signal Corps supply
the production lines. But his rate of pro-
and Signal Corps research had grown much
duction dissatisfied the Army in 1941.21
too big for one man to handle. These mat-
21
His largest supply problem, in 1941, had been ters Col. David Sarnoff and the other mem-
the provision of radar equipment for the AAF.
See Terrett, The Emergency, pp. 164, 255, 258-74, bers of the Signal Corps Advisory Council
especially p. 272. See also Watson, The War De- well understood and stated when, in the
partment: Chief of Staff, Prewar Plans and Prepa- autumn of 1942, they advised General Olm-
rations, p. 49. See also pp. 58-59, 335-37, 532-35,
above. stead on Signal Corps procurement.
SIGNAL CORPS POSITION IN MID-1943 543
In December 1942 Olmstead had taken action was taken until General Ingles be-
the Council's advice to the extent of nam- came the Chief Signal Officer in mid-1943.
ing an assistant chief signal officer to relieve Colton himself opposed the division of his
him of much of the detailed supervision over double responsibility. He believed that he
supply matters. Maj. Gen. James A. Code, best understood both supply and develop-
who had been Deputy Chief Signal Officer ment. He regarded them as so interrelated
since March 1942, got the post, to remain that they should not be split. But his chief
the assistant throughout the remainder of concern was good development. This, it
World War II. Col. Carroll O. Bickelhaupt seemed to him, was more important than
moved up to become the deputy. General mass supply, especially if mass supply meant
Colton continued as chief of the Signal Sup- hurrying imperfectly developed equipment
ply Service, under whom Research and De- off the production lines. He had said in De-
velopment remained a large object of at- cember 1942, speaking of radar, that elec-
tention alongside of Supply.22 tronic production was not like making nuts
What the Advisory Council had con- and bolts; that if the Signal Corps had
templated was a much more thoroughgoing adopted such a crude view instead of seek-
reorganization than this. Its proposal that ing to produce the very best, American
an assistant chief signal officer be appointed armies in the field would have suffered,
had been predicated upon a vigorous re- would have lost battles.24
vamping of the Signal Corps—a revision Olmstead agreed with Colton. "Supply
upon a functional basis. The Council urged begins with Research and Development,"
that the Corps undertake a reorganization Olmstead told a board of inquiry in May
which would recognize the difference in 1943. When asked if research and develop-
character between its operations in a mili- ment and supply and procurement should
be linked closely, he replied, "I do."25 He
tary field and those it performed as a sup-
did not therefore wish to introduce basic
ply service, a reorganization which would
organizational changes in this matter. Even
"clearly define and sharply delimit the
if he had wished to assign procurement to
functional responsibilities within these two another man, he did not have in the Signal
different areas of operation." 23 Corps any officers who were specialists in
A shake-up in the Signal Corps supply mass production. He would have had to look
function definitely seemed necessary. Yet no around for someone with experience in pri-
vate business, such as William H. Harrison,
22
Signal Corps Administrative Log, 1939-1945, former vice president and engineer with the
pp. 35 and 64, OCSigO Orgn Charts No. 14, 9 American Telephone and Telegraph Com-
Mar 42, and No. 19, 14 Dec 42. SigC Hist Sec
File. See also p. 336, above. pany, whom General Ingles subsequently
Since late 1942 Colton's Supply Service embraced appointed as Signal Corps' supply chief.26
the Research and Development Division under
24
Colonel Rives; the Materiel Division under Col. Log entry, 28 Sep 42. Deputy CSigO Folder,
Eugene V. Elder; and the Distribution Division 1942-45, pp. 94, 177. SigC Hist Sec File.
25
under Mr. David H. O'Brien. The Distribution Proceedings of Board To Investigate Communi-
Division became the Field Service Division in March cations, Tab P, pp. 6-7.
26
1943, still under O'Brien. Chart No. 19, in Log Harrison had been commissioned a brigadier
cited above, and No. 22, 1 Mar 43, p. 76. general in the ASF. It was he whom General Somer-
23
Memo, Col David Sarnoff et al., for CSigO, vell put in charge of the Army Pictorial Service
24 Oct 42. SigC 334 Signal Corps Advisory Coun- when the ASF temporarily took over Signal Corps
cil, 1942. [Deputy CSigO File]. photography in March 1943. See pp. 422-23, above.
544 THE SIGNAL CORPS
Olmstead did take steps to the extent of to get the job done despite organizational
seeking out David H. O'Brien, vice presi- confusion. As for the situation in Washing-
dent of Graybar Electric Company, and ton, it was General Olmstead's opinion,
assigning him in December 1942 to the shared by many of his officers, that the effi-
Distribution Division under Colton's Supply ciency and effectiveness of the Corps suf-
Service.27 But he failed to take any further fered from the Chief's lack of strong
or more drastic steps to meet the lack of authority and central control, particularly
experienced production officers. Subse- in operational functions as distinct from sup-
30
quently, late in 1943 Brig. Gen. Frank ply matters.
Meade expressed the opinion that Signal Lacking the high-level position of con-
Corps' failure to meet its production pro- trol it desired, the Signal Corps hitherto,
gram in its entirety "could have been in order to accomplish things which called
avoided had the Signal Corps had any pro- for over-all co-ordination, had had to work
duction experts in its officer corps." Such
co-operatively through numerous organiza-
officers, Meade added, should be "not
tions such as the Joint Communications
merely contracting or distribution specialists
Board and the Army Communications
but men skilled in factory management and
control and in the techniques of establishing Board with their many committees. Progress
and maintaining factory production and in matters submitted to boards and commit-
control of the flow of material and labor." 28 tees was slow and devious, passing through
tortuous channels. Early in the war, just
The Problem of Army-Wide Signal Control when the Signal Corps would have liked
more Army-wide authority, the effective
The control of communications through- radius of its influence and power had been
out the Army had been a sensitive point shortened, drawn into the sphere of the
with the Signal Corps since World War I.29 Army Service Forces, in consequence of the
Now in World War II Signal Corps control
30
at home stopped at the division and the Indicative of Signal Corps beliefs was the fol-
lowing list drawn up in Olmstead's office in April
Corps had no direct control of its troops 1943 and described as "certain features of Signal
abroad. Even so, the overseas Signal Corps Communications which can be coordinated only
machinery was functioning with consid- under the authority of the Chief of Staff":
Assignment of types of equipment
erable success because of the excellence of Communication Countermeasures
the equipment, the zeal of the personnel, Enforcement of standard procedures and authen-
tication methods
and the determination of officers and men Control over assignment of call signs and fre-
quencies
27
In the autumn of 1942 Colonel Sarnoff and the Co-ordination of tactical communication opera-
Deputy Chief Signal Officer, General Code, gave tions
some thought to possible candidates in the elec- Allocation of existing commercial communica-
tronics industry for appointment to Signal Corps tions facilities among the several components
supply. Log entry Sep-Oct 42, Reorganization. Signal Intelligence
Deputy CSigO Folder 1942-45, p. 177. SigC Hist Signal Security
Sec File. War Department communications system
28
Post War Signal Corps Demobilization Study. Draft Memo, unsigned, for CG ASF, 9 Apr 43,
Deputy CSigO Folder, 1942-45, pp. 200-201. SigC sub: Co-ordination of Sig com with Army as a
Hist Sec File. whole. SigC 676 Gen Coordination of Sig Com
29
Terrett, The Emergency, pp. 23-25, 133-35. Within the Army as a Whole, 1943 (OD-38).
SIGNAL CORPS POSITION IN MID-1943 545
264-2L1 0 - 7 8 - 3 6
546 THE SIGNAL CORPS
1943. In June the situation exploded. Or signal communication is one of the major
rather, instead of an explosion, it was an functions of Command, hence requires a
implosion, which burst in upon the Chief trained Signal Officer on the Staff of all
Signal Officer, General Olmstead himself, Commanders, including the Chief of Staff."
destroying him. They pointed to the high place which sig-
Since the spring of the year before, the nal control enjoyed in the structure of other
Signal Corps under the energetic impetus armies: British, German, and Japanese.
of the Deputy Chief Signal Officer, Gen- They concluded that the Chief Signal Offi-
eral Code, had pressed for a place on the cer should serve directly under the Chief
War Department General Staff, in order of Staff, that he should have immediately
that the Chief Signal Officer might serve under him in his high general staff function
in a position where he could grasp lines of both the Army Communications Service
control to (1) a signal officer in the Army and the Executive Control Division, and
Ground Forces, to (2) a signal officer in that he should have control over three Dep-
the Army Air Forces, and to (3) a signal uty Chief Signal Officers, one each in the
officer in the Army Service Forces, wherein Army Ground Forces, the Army Air Forces,
the bulk of signal work (all that per- and the Services of Supply.36 These officers
tained to procurement, research, and so on) may have been opinionated. But their opin-
might continue to be carried out. On 11 ions were the honest beliefs of specialists.
June 1942 General Code had appointed They had merit. Dr. Bowles, troubled over
three Signal Corps officers, Brig. Gens. Air Forces electronics in 1943, wrote to
Charles M. Milliken and Frank E. Stoner General Arnold, the Air Forces chief, in a
and Col. David M. Crawford, to report similar vein: "Our German enemy has long
to Olmstead "on the necessity for and com- had a keen appreciation of the vital char-
position of signal sections" to be placed in acter of these technical fields and has given
the War Department General Staff and in them thorough application. Both the Brit-
the staffs of the Commanding Generals, ish Navy and our own recognize that com-
AGF, AAF, and SOS.35 munications are of direct concern to the
Early in July 1942 these officers had an- highest commands." 37
nounced that the reorganization of the No action was taken in mid-1942 when
Army the previous March "seemed to over- Crawford, Milliken, and Stoner submitted
look the fact that the Signal Corps is both their report to the Chief Signal Officer. Gen-
an Arm and a Service; that without ade- eral Olmstead was absent on a trip to Eng-
quate trained signal personnel and field sig- land. He did not return until late July of
nal systems the war can easily be lost; that that summer.38 The report was laid aside,
35 36
OCSigO R&W Action 1, Gen Code. Deputy Report of Proceedings of Board of Officers,
CSigO, to Gen Milliken, Gen Stoner, and Col Services of Supply, Office of the Chief Signal Offi-
Crawford, 11 Jun 42, sub: Sig officers for AGF, cer, Washington, D. C., 10 Jul 42, signed by
AAF, SOS, and WDGS. SigC 319.1 Staff Signals Milliken, Stoner, and Crawford, with Incls, Ex-
(Signal Officer for AGF, AAF, SOS and WDGS), hibits A-1. SigC 319.1 Staff Signals (Signal Offi-
1942. cer for AGF, AAF, SOS and WDGS), 1942.
37
Milliken was chief of the Signal Operations Serv- Memo, Bowles for Arnold, 16 Jun 43, sub:
ice; Stoner, of the Army Communications Service; AAF com, p. 1. OCS (WDCSA) 676 (28 Dec 43).
38
Crawford, of the Communications Coordination (1) Ltr, CSigO to CG SOS, 20 Jun 42, sub:
Division. U. S. Com Mission to Great Britain; (2) Ltr, Code
SIGNAL CORPS POSITION IN MID-1943 547
apparently without being circulated outside Air Forces. Combined operations by Amer-
the Signal Corps. But the idea which it con- ican, British, and French armies working
tained would appear again. New and still together called for still higher central con-
newer needs for signal control were daily trol—control over more and wide-spread
arising, concomitantly with the develop- activity, over co-ordinated wire, radio and
ments and applications which accompanied radar operation, over co-ordinated radio
the fantastic growth of wire, radio, and ra- and radar Countermeasures, over co-ordi-
dar in World War II—radar gunlayers, ra- nated intercept and analysis of enemy sig-
dio and radar Countermeasures, radio and nals. To the extent that these higher needs
radar intelligence. The supply and service were developing, the reorganization of
obligations of the Signal Corps had carried March 1942, which had subordinated Sig-
the whole Corps into General Somervell's nal Corps operations to the Services of Sup-
Services of Supply. But signals could not ply, appeared to have been a step in the
be nailed down as a purely supply or serv- wrong direction. It can be pointed out, of
ice function. "I do not feel," wrote Dr. course, that the SOS embraced far more
Bowles in mid-June 1943, "that a field as than merely supply and that since it in-
broad as communications, so basic in all cluded services it could properly encompass
operational plans, of such tremendous po- everything the Signal Corps did. But the
tency as a weapon, and so essential to com- fact remains that many officers regarded
mand can be treated in the same manner the SOS as a supply agency primarily.40
as photography and comparable detail In short, inclusion in the SOS had spot-
services." 39 lighted the supply aspect of the Signal Corps,
Pressure for better signal control, for bet- and, as many Signal Corps officers viewed
ter operation of communications, especially the scene, had cast a shadow over the very
in the Army Air Forces, increased daily. In different and very important other aspect
every theater of the war chiefs of staff found of the Signal Corps, its operational func-
that they must have signal officers on their tions. In the Navy these two aspects of com-
staffs, familiar with their plans and opera- munications were entirely separate. Re-
tions and able to control with a strong hand search and development, procurement and
every detail of signal installation, operation, supply, fell to the Bureau of Ships. Opera-
and procedure within their theaters. Just tion of naval signals fell wholly to the Direc-
now in North Africa, the exigencies of com- tor of Naval Communications, who was
bat were making commanders communica- Rear Adm. Joseph R. Redman during
tion-conscious as never before, and on a most of World War II. He and he alone with
scale which was enveloping all the armed his small strongly knit organization con-
services and all the Allies. An amphibious trolled all naval communications down to
operation, for example, called for positive every communicator in every ship and
control over signals—a height of control station.41
which towered above the former lines of
No remotely comparable control over the
authority within the Army and the Navy
operations of signals existed in the Army.
and within that soaring Army offshoot, the
40
to Somervell, 22 Jul 42. Hq ASF File, SigC 1942- Proceedings of Board To Investigate Communi-
44, Drawer 6 (RG 200-ASF-Somervell). cations, Tabs B-FF inclusive, passim.
39 41
Memo, Bowles for Arnold, p. 4, cited n. 37. Ibid., Tab T.
548 THE SIGNAL CORPS
Further, the Army Air Forces had become the hands of the airmen, did not receive
increasingly independent, and now even the adequate consideration and guidance until
Ground Forces were far removed from the General Arnold finally reorganized the ac-
Chief Signal Officer since the latter had tivity late in the summer of 1943 under
been placed under the Army Service Forces. General McClelland, who took for his
For example, it was lamented, possibly with deputy Colonel Rives of the Signal Corps.
some exaggeration, that: Earlier in the war Arnold had relied upon
. . . The Chief Signal Officer is virtually Colonel Marriner, charged with a Com-
powerless in directing action on Tables of Or- munications Office which was bandied
ganization, Tables of Equipment, doctrine, about like the hot potato that it was.44
procedures, allocation of critical equipment "Arnold will listen to no one on communi-
and trained personnel and establishment of
requirements . . . The Chief Signal Officer cations, not even the Chief Signal Officer,
under the Commanding General, Army Serv- except one Colonel Marriner." So Maj.
ice Forces, is constantly at a disadvantage be- Gen. George E. Stratemeyer, Arnold's
cause of the attitude that his is basically a Chief of Staff, had told the Deputy Chief
supply function. To carry out the imperative Signal Officer, General Code, in September
operational staff functions, the Chief Signal
Officer should be in position in the organiza- 1942.45
tion permitting operational direction. Code also learned from Stratemeyer that
Such were the words with which one officer Air Forces officers "want none of us within
in Olmstead's office expressed his views of their organization, but only air-minded
the matter in 1943, whatever the view communicators who understand their air
others might take of the Army Service problems." However reasonable this may
Forces.42 have seemed to the airmen, it was not an
argument that Code would accept. "These
Dissatisfaction over Signal Control are words," he informed the Chief Signal
in the AAF
The state of communications in the Army being no head, there is no energetic leadership. . . .
The result is confusion of responsibility, demorali-
Air Forces greatly concerned the Signal zation and discouraging delay." Memo, Bowles for
Corps, which supplied the equipment, sig- Arnold, p. 2, cited n. 37.
44
nal units, and many services. During the The office, later a division, was located till
late 1941 in the Training and Operations Division;
first two years of World War II, Air Forces from December 1941 to March 1943, in the Di-
communications remained a good deal less rectorate of Technical Services; and from March
to August 1943, under the Assistant Chief, Air
than satisfactory.43 Operational control, in Staff, Materiel, Maintenance and Distribution. M.
P. Claussen, Development of Radio and Radar
42
Reasons Why the Chief Signal Officer Cannot Equipment for Air Operations, 1939-1944, Ch. I,
Exercise Staff Control over Communications in p. 13. AAF historical monograph, photostatic copy
the Army under the Present Organization, un- in SigC Hist Sec File.
signed, undated. SigC 676 Gen Coordination of The shifts and confusion in AAF signals during
Sig Com Within the Army as a Whole, 1943 that period are made most evident in the testi-
(OD-38). monies of Col. Charles H. Dowman, Colonel Mar-
43
See, for example, pp. 283ff., above. Dr. Bowles riner, and General Stratemeyer, Tabs F, S, and DD,
castigated Air Forces signals in mid-1943 as fol- respectively, in the Proceedings of Board To In-
lows: "Such communications responsibilities as vestigate Communications.
45
have not been entirely overlooked in the recent Memo, J. A. C. for CSigO, 10 Sep 42, stay-
reorganization plan are widely dispersed, obscure back copy. Deputy CSigO Folder, 1942-45, pp
and for the most part completely submerged. There 17, 26K. SigC Hist Sec File.
SIGNAL CORPS POSITION IN MID-1943 549
Officer at the time. "Communications know summarized the Signal Corps view in Au-
no particular service," he generalized, "nor gust 1942, recommending that General
recognize any restricted field. The opera- Arnold "authorize and immediately create
tion," he argued, "whether from air, a signal section on the 'policy level' in the
ground, or what, is similar. There are no Army Air Forces; such section to be headed
unique problems in the Air Corps not read- by a Signal Officer who will be a member of
ily recognizable by communications per-
the Staff of the Commanding General,
sonnel." Code pressed Olmstead that "as
Army Air Forces." 48
technical advisor to the Chief of Staff you
cannot afford to permit this portion of the General Arnold had done nothing. As
Army to be self-sufficient unto themselves. Stratemeyer had told Code at the time, Ar-
No war and especially this one in which nold wanted "air-minded communicators,"
communications play such a vital part can not Signal Corps men, and he would not
be sufficiently waged by fractional elements heed the Chief Signal Officer. Meanwhile,
operating under independent leadership but communications in the Army Air Forces
only by completely synchronized bodies." had continued unsatisfactory right on into
He made it emphatic: "The chain of com- the North African campaign. In 1943 Brig.
mand must start at the top."46 Gen. Gordon P. Saville, AAF director of
Communication control in the Army Air Air Defense, returned from the African
Forces remained weak and confused all scene dissatisfied. He attributed poor air
through 1942. In June of that year General communications there to the absence of a
Code had complained, "The present dis- signal officer on the AAF staff, according to
tribution of Signal Corps officers on the staff
General Meade, who commented on the
of the Commanding General, Army Kir
matter to Code in January 1943. Further,
Forces, makes it extremely difficult to co-
Saville wanted a Signal Corps officer as-
ordinate Signal Corps matters with that
staff." In July 1942 Col. Jay D. Lattin, signed to the job. Colonel Marriner agreed.
Chief of the Signal Corps Military Train- Both Saville and Marriner discussed the
ing Division, had complained specifically matter in May 1943 with General Colton,
that there was "no one Army Air Force of- who was the acting Chief Signal Officer
fice to which members of the Military during Olmstead's world tour. They stressed
Training Division, OCSigO, can go for con- the need for a Chief Signal Officer with
sultation and coordination on training mat- over-all powers. They emphasized that
ters." What was needed, he urged, was "a the "absence of a Chief Signal Officer
signal officer on the Staff of the Com-
manding General, Army Air Forces, Jul 42, sub: Necessity for a Sig officer and Sig Sec
charged with the planning of all matters on the staff of the CG AAF with Report of Pro-
ceedings of Board of Officers, SOS, OCSigO. SigC
pertaining to signal communication for the 319.1 Staff Signals (Signal Officer for AGF, AAF,
Army Air Forces." 47 General Olmstead had SOS 48
and WDGS), 1942.
Ltr, CSigO to CG AAF, 29 Aug 42, sub:
46
(1) Ibid. (2) Log entries, 11, 12 Nov 42. Recommendation to include a Sig officer on the
Deputy CSigO Folder, 1942-45, p. 37. SigC Hist staff of the CG AAF; this officer to be on a
Sec File. "Policy Level" and to direct com Policy and Plan-
47
(1) OCSigO R&W Action 1, cited n. 35. (2) ning. SigC 020 Air Forces, 1942. [Deputy CSigO
Memo, Lattin for Milliken, Dir Sig Opns Sv, 10 File.]
550 THE SIGNAL CORPS
of the Army, in fact, was hampering devel- Proposal that Army and Navy
opment of Air Force communications and Signals Merge
the situation," they declared, "was becom- The unsatisfactory state of control over
ing more serious." Marriner added, "There Army-wide communications, when coupled
should be a Chief Signal Officer of the with resurgent problems of amphibious
Army with superior control of all commu- operations, had already led to thoughts
nications." 49 about an Army-Navy merger in signal mat-
Several weeks later, in June 1943, Dr. ters. As early as 1 April 1942 General Som-
Edward Bowles, in the office of the Secre- ervell had passed down to Olmstead a di-
tary of War, sharply criticized the state of rective from the Secretary of War asking
communications in the Army Air Forces. that plans be evolved for co-ordinating
"At present," he wrote "despite the vital communications and radar for amphibious
importance of communications, the Army task forces, in which units of the Army, the
Air Forces have neither the organizational Navy, and the Army Air Forces would par-
framework nor the integrated group of ticipate.51 Some months later General Styer,
qualified military and technical minds in Somervell's office, asked Olmstead to
which is necessary to derive the most from "please contact appropriate officials in the
these important fields." He extended his in- Navy Department and proceed with a sur-
dictment to all the Army when he added, vey with them looking toward a merger of
"At the present time there is no strong con- Army and Navy Communications Services
sciousness of communications, radar and
into a Joint Communications Service." 52
electronics within the Army as a whole. . . .
Members of an ad hoc committee, drawn
High staff planning agencies lack the es-
sential concept of communications as sys- for the purpose from the Joint Communi-
tems which are fundamental in tactical cations Board, together with officers in Olm-
planning and in successful combat opera- stead's Office of the Planning Director, es-
tions." He defined communications and pecially Colonels Lanahan and Guest,
signals as including wire, radio, radar, bea- worked upon the survey, without benefit of
conry, Countermeasures (both radio and
51
radar) and related electronic fields.50 Thus Memo, Somervell for CSigO, 1 Apr 42. Hq
ASF File, Sig Officer, Office of the Chief (CofS
the ever-strengthening, ever-diversifying ASF Gen Styer, A 46-274, 2087).
currents of U. S. Army communications In March 1942 General Marshall and Admiral
King began exchanging memos toward setting up
were flowing fast and widely and, it seemed, a Joint Communications Committee, to look into
almost without operational control, cer- Army-Navy signals. According to a historian of the
Joint Chiefs of Staff, the committee was more per-
tainly without strong control in the Wash- functory than serious and was set up with intent
ington headquarters of the War Depart- to recommend "some modest amelioration sufficient
to prevent more drastic action on the one hand,
ment. while preserving the essential autonomy of each
service on the other." Vernon E. Davis, Hist Sec
49
(1) Log entry, 11 Jan 43, Deputy CSigO JCS, historical monograph, History of The Joint
Folder, 1942-45, pp. 4, 39. SigC Hist Sec File. Chiefs of Staff, Organizational Developments, Vol
(2) Diary of Events Relating to Informal OPD II—Development of the JCS Committee Structure,
Proposal, Mar-Apr 43, entries dated 27 Apr, 29 pp. 439-43. OCMH.
52
Apr, 4 May 43. SigC 676 Gen, Army-Wide Coordi- Memo, Styer for CSigO, 23 Dec 42. Hq ASF
nation and Control of Com, 1943 (SPSOD-31). File, Sig Officer, Office of the Chief (CofS ASF
50
Memo, Bowles for Arnold, p. 1, cited n. 37. Gen Styer, A 46-274, 2087).
SIGNAL CORPS POSITION IN MID-1943 551
the Navy. For Admiral Redman, the Direc- trol of Army communications all the way
tor of Naval Communications and senior down to the front line. In France during
member of the Joint Communications World War I the Signal Corps had had
Board, would not concur in the preparation such control. The Navy had it of course.
of the survey, saying he would report sepa- Many Signal Corps officers hoped to re-
rately and directly to Admiral King. Thus cover such control. But the established Army
the eventual study was made independently policy since World War I was that com-
of the Navy, as Olmstead explained to Som- manders in the field should enjoy absolute
ervell when he presented a copy on 9 March command. As General McNair expressed
1943, although it had the concurrence of the policy in the spring of 1943:
General McClelland, Army Air Forces, and . . . the Quartermaster Corps in the past has
of the other Army members of the Joint tried to take over the operation of all army
Communications Board. At the same time, messes; the Ordnance Department has tried
scarcely two weeks before he departed on to take over the supply of ammunition to in-
his long overseas trip, Olmstead summa- clude the front line, and the Signal Corps has
tried to take over signals to include the infan-
rized his own conclusions. He believed that try regiment. The decision uniformly has been
an over-all services of supply should be set that the integrity of the arms should be pre-
up, embracing the present functions of the served in the interest of teamwork and unity
ASF with those bureaus of the Navy which of command. . . .54
involved related activity. He would, more- These committee studies of the proposed
over, split supply from operations. Opera- merger of military communications, made
tions, he thought, should involve "some at the turn of 1942-1943, had been ex-
form of single national defense control with ploratory only. There were many blocks at
[a] superior staff over the Army and Navy that early stage of collaborative operations
53
and possibly an Air Force." by the several armed services. For example,
Concluding his comments upon the com- in 1943 Admiral Redman, responsible for all
mittee's survey of an Army-Navy signal naval communications and enjoying a place
merger, Olmstead further informed Somer- on the staff of the Chief of Naval Opera-
vell, "The principle that communications tions, complained that he encountered dif-
are an attribute of command is adhered to ficulties when he tried to co-ordinate naval
throughout." That is to say, the Signal communications with those of the War De-
Corps committee members who participated partment. The reason was that he had no
opposite number with whom to deal in the
in this merger study did not argue for con-
Army. There was no officer on General
53
(1) OCSigO R&W Action 1, Col Lanahan to Marshall's staff possessing powers compa-
Dir Com Coord Div, 16 Jan 43, sub: Consolida- rable with his. "Don't you think we have
tion of com Army-Navy. SigC 676 Gen, Consolida- got to put it [Army communications con-
tion of Com Services Army-Navy, 1942-43 (OD-
29). (2) Memo, CSigO for Somervell, 9 Mar 43.
trol] on a par with Admiral Redman in the
SigC 676 Gen Coordination of Sig Com Within the Navy . . .?" asked Col. Carter Clarke, a
Army as a Whole, 1943 (OD-38). member of the Army board investigating
A separation of supply and operational functions,
in short, a functional reorganization of the War
communications in the spring of 1943.
Department, was considered briefly by the Chief of
54
Staff in 1943, according to Huston, Time and Palmer, Wiley, and Keast, The Procurement
Space, Ch. II, pp. 85-86, cited n. 15. and Training of Ground Combat Troops, p. 398.
552 THE SIGNAL CORPS
"Then you've got a director," responded High-Level Control by Communications
Lt. Col. James McCormack, War Depart- Boards: J CB, CCB, ACB
ment General Staff G-4, adding, "the Navy Such operational control over Army
has much better centralized administrative communications as did exist in Washing-
control [of signals] than we have." 55 ton at levels above the supply-laden Signal
This dissimilarity in the operation of Corps was to be found in certain communi-
Army and Navy signals constituted one cations boards. One was the Joint Com-
block in the way of a merger. Another block munications Board (JCB); another was
lay in the fact that there was some disin- the Combined Communications Board
clination on Navy's part to establish joint 58
(CCB). Both before the mid-1943 Signal
communications.56 Furthermore, the scope, Corps crisis and after it, the JCB, serving
the mission, and the details of Army and the Joint Chiefs of Staff, constituted the
Navy signals varied too widely to permit highest co-ordinating agency in U.S. Army
ready merger at the time. "The scope of the signals. "The Joint Communications Board
Army Signal Corps with respect to army has inadvertently become the communica-
communications," according to the survey tions and radar brain for the Army," as-
by the ad hoc committee members, "is, ex- serted Dr. Bowles in June 1943. It had ac-
cept for operation, considerably broader quired top-level control over electronics, he
than that of the Naval Communication emphasized, precisely "because of the lack
Service with respect to Naval Communi- of well-defined leadership in these matters
cations." In operation it was narrower, be- within the Army." 59 One reason the Army
cause "the Army Signal Corps, unlike the lacked well-defined leadership in signals
Naval Communication Service, does not was that its representation on the JCB and
conduct the intra-communications of all CCB was divided. The two Army members,
branches of the Army," and scarcely for the who sat on both boards, were the Chief Sig-
Army Air Forces at all. In sum, according nal Officer and the Director of Technical
to the survey, "The functions of the two Services, Army Air Forces. Since these two
communication services are unlike funda- officers were not always entirely of one
mentally as a result of the differences in the mind, they did not present a unified point
primary missions of the services. Practicable of view for the Army. The two Navy mem-
consolidation," the committee members
concluded, "is contingent upon unification of Working Toward the End in View, p. 33. SigC
676 Army-Navy, 1943 (SPSOR-8-3).
of command." 57 58
Signaling difficulties between the Army and
the Navy and between the U.S. military services and
55
(1) Diary of Events Relating to Informal OPD the British had led to a number of communica-
Proposal, Mar-Apr 43, entries for 27 and 29 Apr tions committees and boards, which by mid-1942
43. (2) Proceedings of Board To Investigate Com- crystallized into the Joint Communications Board
munications, Tab D, p. 10. (Army-Navy) and the Combined Communications
56
Ltr, Code to CofS, 13 Apr 42, stayback copy, Board (U.S.-British) under the Joint Chiefs of
and log entry 20 Apr 42. Deputy CSigO Folder, Staff and the Combined Chiefs of Staff, re-
1942-45, pp. 11, 58. SigC Hist Sec File. spectively. Davis, History of the Joint Chiefs of
57
A Survey Looking to the Merging of Army and Staff, pp. 426-49, cited n. 51. See also Dr. Courtney
Navy Communications Services Initially to Involve R. Hall, Signal Corps Participation in Boards and
Removal of Duplication and Overlaps and the Committees (1946), SigC historical monograph
Performance by One Service of Certain Functions D-2, passim. SigC Hist Sec File.
59
for the Other, as well as Any Other Ways and Means Memo, Bowles for Arnold, p. 2, cited n. 37.
SIGNAL CORPS POSITION IN MID-1943 553
bers were united, being the Director of ilarly, the CCB served to co-ordinate the
Naval Communications and his subor- communications of the United States
dinate, the Communications Officer of the Forces with those of their Allies, especially
Staff of the Commander in Chief, U.S. the British. There was also a Joint Radio
60
Fleet. An inevitable result in Army-Navy Board, formed in November 1941, which
signal relations, as Bowles pointed out, was sought to standardize aircraft radio equip-
"the usurpation of leadership by a Joint ment: Army, Navy, and British.63
Communications Board dominated by a Participation in these boards gave the
wide awake Navy group and with no cor- Chief Signal Officer some degree of opera-
responding Army strength to balance in- tional influence. He took action, in behalf
terests."
61 of the Army, to implement the directives
The four top-level communications offi- of both the JCB and the CCB. But the chan-
cers who constituted the JCB established nels to the field remained many and de-
policies, while the great bulk of work which vious, and the boards themselves acted
slowly. Complaints arose "that extreme de-
the board had to handle was processed by
lay is usually experienced in receiving de-
numbers of committees. The JCB was but-
cisions through War Department chan-
tressed, as of mid-1943, by a Coordinating nels. . . ." 64 When time can be afforded,
Committee and no fewer than twenty-four discussion and co-ordination have great
working committees. These committees pro- value, but they are luxuries which do not
vided "a means for coordination of plans, often adorn military action. Speaking of the
procedures, research, development, stand- need to get things done by command ac-
ardization and procurement precedence." tion, General Meade said, "In war time
The board itself was intended to be "the coordination is one of the most wasteful
agency wherein the communications interest ways to accomplish things I have ever seen."
of the ground, air and sea forces are brought That eminent commander, General Mc-
together and coordinated as a single or- Nair, reflected Meade's sentiments when he
ganization. . . ." In short, during World ejaculated, "I am a great leather of
War II the JCB brought the communica- boards. . . ."65 These high-level boards,
tions services of the Army and the Navy "as 63
Ibid., pp. 22-24.
close together under a single directing 64
Diary of Events Relating to Informal OPD Pro-
agency—the Joint Chiefs of Staff—as is pos- posal Mar-Apr 43, entries for 20 Mar, 27 Apr 43.
sible without a unified command." 62 Sim- Much of the testimony before the board investi-
gating communications in May 1943 related to the
60
Davis, History of the Joint Chiefs of Staff, p. slow motion of the ACB, JCB, and CCB. See Pro-
449, cited n. 51. ceedings of Board To Investigate Communications,
61
Memo, Bowles for Arnold, p. 2, cited n. 37. Tabs D-K.
65
Bowles specified, as another undesirable conse- Proceedings of Board To Investigate Communi-
quence of this unbalance, the "disproportionate cations, Tab M, p. 11, and Tab BB, p. 2.
utilization of research and development agencies A historian commenting on the postwar Joint
for essentially Navy projects. For example, one of Chiefs of Staff and its great number of committees,
the strongest and most potent sources of radar saw danger in the "delay and rancour of long-
ideas in the country, the Radiation Laboratory at drawn out arguments. . . ." Anxiety to avoid pro-
the Massachusetts Institute of Technology, has longed argument might lead, he believed, to the
been dominated by the Navy, while the Army has dangers of compromise where a compromise might
complacently stood by. . . ." Ibid. be worse than either of the conflicting arguments,
62
A Survey Looking to the Merging of Army perhaps even worse than no decision whatever.
and Navy Communications Services, p. 21, cited Huston, Time and Space, Ch. II, pp. 59-60, cited
n. 57. n. 15.
554 THE SIGNAL CORPS
then, certainly did not give the Chief Sig- by the Chief Signal Officer himself. The
nal Officer the direct Army-wide control ACB, as it replaced the AC&EC Agency,
that he desired. He could not act with quick looked as though it might be potent
directness. and an answer to Olmstead's hopes.
If in these boards or in the proposed The duties of the Board, as set forth
merger of Army and Navy signals General in a War Department Circular in
Olmstead had thought he saw an oppor- January 1943, were "to take such action
tunity to improve his operational control, as may be necessary to coordinate, for the
he had been disappointed. For this purpose Army as a whole, communication methods,
there remained yet a third board, the Army procedures, operation, equipment (includ-
Communications Board (ACB), which ing the recommendations for the coordina-
served the General Staff and of which the tion of research, development, procure-
Chief Signal Officer was the president. ment, and allocation to meet operational
Early in 1943 the ACB had taken form out needs), and all communication matters ap-
of the remains of the Army Communica- plicable to the United States Army. It will
tions and Equipment Coordination Agency formulate directive recommendations on
(AC&EC). This agency went back to the Army communication policies which will be
days just before Pearl Harbor, when Gen- forwarded to the Chief of Staff, G-4, War
eral Marshall had ordered Olmstead to Department General Staff." 67
combat the tendency of electronics to mul- Like other General Staff subagencies the
tiply into specialized applications seemingly Army Communications Board under G-4
without end. At Olmstead's entry into office could merely advise. It had no real power to
in 1941, the Chief of Staff told him to sim- do things directly. In common with most
plify, co-ordinate, and reduce electronic boards and committees, it tended to work
equipment, and to attain these ends Olm- with creaking slowness. Therefore the
stead had set up in his office the AC&EC board did not provide the type of higher
Agency.66 control over Army signal policy and opera-
This agency had been at first merely an tions which General Olmstead and other
advisory unit within the Signal Corps. In Signal Corps officers thought they should
March 1942 it had been subordinated exercise from General Staff level.
along with the rest of the Corps under Gen- But officers in General Somervell's head-
eral Somervell's SOS. What was wanted quarters did not think so. For example, a
was a more powerful agency, on a higher few months earlier, the Control Division,
level, to co-ordinate and control communi- SOS, had opposed any suggestion that cen-
cations Army-wide. Consequently, early in tralized control of communications opera-
1943 the AC&EC Agency became the ACB, tions be established unless evidence could
technically a supporting agency of the Gen- be produced that the current organization
eral Staff. Composed of not more than five 67
(1) Signal Corps Technical Information Let-
officers from each of the three major com- ter No. 15 (Feb 43), p. 38. (2) A Survey Looking
mands of the Army, with liaison officers to the Merging of Army and Navy Communications
Services, p. 31, cited n. 57. (3) WD Cir 23, 18
from the Navy, the Marine Corps, and Jan 43. (4) CSigO, Annual Report, 1943, pp. 49-
the Allied powers, the board was headed 50. See also papers in SigC 676 Gen Coordination
of Sig Com Within the Army as a Whole, 1943
66
Terrett, The Emergency, pp. 294ff. (OD-38).
SIGNAL CORPS POSITION IN MID-1943 555
Less than a week earlier, on 6 May, Gen- "is to place the Chief Signal Officer in po-
eral Olmstead had returned to Washing- sition of direct access to and by the Chief
ton. Now, it seemed to him, was his chance of Staff and the heads of the major Army
to obtain the powers he wished to win for Forces, retaining under him all of the re-
the Signal Corps.82 He coached his officers sources and establishments that are neces-
upon the strategy to be adopted. He in- sary to him in the performance of his mis-
structed Code, Stoner, Meade, Crawford, sion. Any other solution would be a
Lanahan, and Guest. His deputy, General compromise—harmful in proportion to the
Code, was to be "master of ceremonies." degree of its departure from the 'best solu-
Code would "review testimonies to be given tion.' " 84 So Gibbs emphatically believed,
by the Signal Corps members," and he restating Signal Corps' long-standing con-
would be "prepared to step into the breach tention.
as an emergency witness upon call." (He Upon Colonel Lanahan, his Director of
was not, in fact, called before the board, Planning, Olmstead relied heavily. Lana-
but the others all testified at length.) Sup- han prepared careful comments to offer be-
port was expected from General Staff of- fore the board, lending support to a Com-
ficers, General Tansey and Col. Frank N. munications Division in the General Staff,
Roberts; from Air Forces officers, Colonels with the Chief Signal Officer in charge and
Marriner and Smith; and from Admiral commanding subordinate signal officers in
Redman of the Navy.83 the Ground, Air, and Service Forces. Lan-
Further support was sought from a for- ahan readied a review of the signal situa-
mer Chief Signal Officer and friend of the tion in the Army: in the Ground Forces, a
Chief of Staff, Maj. Gen. George S. Gibbs. signal officer with too small a staff to cope
Two years earlier General Marshall had with all his problems; in the Air Forces,
called upon Gibbs for advice in communi- no agency at all charged with over-all co-
cation matters. Gibbs had argued then for ordination, direction, and supervision
a stronger Signal Corps, with direct, un- ("With the result," he asserted, "that chaos
equivocal control over signal operations. exists in Air Force communications,"); in
Now he argued similarly in a letter ad- the Service Forces, the large entire appara-
dressed to the Chief of Staff: "The one best tus of the Signal Corps available for both
supply and operations but unable to control
solution," Gibbs urged General Marshall,
operations adequately; in the War Depart-
82
When Olmstead presented his views to the ment General Staff, the Army Communica-
board investigating signals on 25 May, he stated, tions Board under G-4 impotent to imple-
"I would like to say that in my thoughts there is ment its decision because it was a delibera-
no personal consideration. I have really tried to
figure out what is the best thing for the Army. . . . tive body only. Obviously, one agency, Lan-
I would say he [the CSigO] should have authority ahan argued, was needed on the General
comparable to that of the Director of Naval Com- Staff level to direct and supervise (1) radio
munications. . . ." Proceeedings of Board To In-
vestigate Communications, Tab P, p. 10. frequency assignments, (2) co-ordination
83
Memo for file, unsigned, 11 May 43, with at- of procedures within all components of the
tached Witness List "A." SigC 676 Gen, Army-
84
Wide Coordination and Control of Com, 1943 Incl 2, Ltr, Gibbs to Marshall, 25 May 43,
(SPSOD-31). Neither Tansey nor Roberts actually with Memo, Handy, 16 Jun 43, sub: Personal ltr
testified, but numbers of other General Staff of- for CofS from Gibbs, respecting com. OCS 210
ficers did. G Open Files (OPD 320 5-23-42).
SIGNAL CORPS POSITION IN MID-1943 559
Army, (3) operational direction of radio and information, and by which they exercise
Countermeasures to insure proper co-ordina- control of operations, then the War Depart-
tion of strategic and operational plans and ment General Staff Sections charged with
strategic and operational planning and the
to insure effective deception of the enemy, operational direction of the Army should have
(4) co-ordination of equipment types for immediately available to them an agency ca-
all the Army, (5) operational direction of pable of advising on the signal communica-
radio intelligence, and so on, for a dozen tion aspects of each strategic and operational
more matters which Signal officers believed plan. Conversely, an agency charged with the
policies, plans, and broad operational direc-
pressed for better control. While Lanahan tion of signal communication must be in con-
worked over these comments, Colonel Guest tinuous contact with these General Staff
drew up charts showing the proposed War Sections.86
Department Communications Division en- On 11 May, the day on which the hearings
joying a box alongside the four G's and of the new board were scheduled to begin,
OPD of the General Staff.85 General Olmstead informed General Som-
General Olmstead expressed his own ervell about his aspirations for himself and
views most fully in a memorandum which for the Signal Corps. "As a result of the re-
he prepared for the Chief of Staff. It read: organization of the War Department in
My recent tour to several theaters of op- March, 1942," Olmstead wrote, "essential
eration has confirmed my opinion that a coordination of Signal Communications
strongly authoritative centralized agency is es- with the Army as a whole has inadvertently
sential to co-ordinate the many and diverse suffered." It had suffered so severely, he
problems of signal communication for the
Army as a whole. This agency must have au-
continued, that "authoritative centralized
thority to establish policies, issue directives, coordination is not now being exercised."
and act, or prepare action, for the Chief of What was needed, General Olmstead con-
Staff. While charged with these responsibili- tended, was a Communications Division on
ties by law, I have been seriously handicapped the War Department General Staff, headed
in exercising them from a subordinate posi-
tion in one of the three coequal interested
by the Chief Signal Officer.87
components of the Army. My actions and rec- Between 11 May and 8 June the Board
ommendations frequently have been subject to Investigate Communications took testi-
to approval by uninformed staff sections of monies from some thirty high-ranking offi-
the Army Service Forces and further delayed
in implementation by Assistant Chiefs of cers, who represented all branches of the
Staff, again requiring concurrence of the Army, and from, Admiral Redman, Direc-
Commanding General, Army Air Forces, or tor of Naval Communications. The findings
Commanding General, Army Ground Forces, of the board, published in detail on 21 June
or both. If, as I firmly believe, signal com-
munications are vital agencies of command in 1943, asserted, among much else, that "con-
this war by which commanders gain warning trol and coordination of signal communica-
85 86
Incl, Col Lanahan, Comments to Board on Draft Memo, unsigned, for CofS, undated, sub:
Proposed Communication Division, and other un- Staff supervision of Sig Com for the Army. SigC
numbered papers, charts, etc., with Memo, unsigned, 676 Gen, Army-Wide Coordination and Control
for CSigO, 11 May 43, sub: Army wide coordina- of Com, 1943 (SPSOD-31).
87
tion and control of com. SigC 676 Gen, Army-Wide Memo, unsigned, for CG ASF, 11 May 43,
Coordination and Control of Com, 1943 (SPSOD- sub: Coordination of Sig com with the Army as
31). See also Proceedings of Board To Investi- a whole. SigC 676 Gen, Army-Wide Coordination
gate Communications, Tabs N and N-l. and Control of Com, 1943 (SPSOD-31).
560 THE SIGNAL CORPS
tions within the Army are inadequate, prevailed. However real and pressing Army
unsatisfactory and confused." The board communication troubles were, the decision
recommended that there be established on was against any change in the headquarters
the War Department General Staff a Com- organization, except in respect to the Chief
munications and Electronics Division with Signal Officer himself.
broad powers and direct control.88
The board's recommendation was dis- The Signal Corps Swaps Horses in
approved. The notion of lifting the Signal Midstream
Corps or any part of it out of the ASF, trans-
ferring it to the General Staff to constitute General Olmstead Retires
an additional activity there, ran counter to In early June, some days before the com-
the intent of General Marshall's purpose munications board. submitted its recom-
when he reorganized the Army in March mendation, General Marshall and General
1942. The idea was repugnant to a number Somervell had decided to ask General Olm-
of Marshall's administrators. "McNarney stead to retire. There were various reasons
[the Deputy CofS] is basically against other for this decision—including Olmstead's per-
Staff sections," Brig. Gen. Raymond G. sonality, which had contributed both to low
Moses, General Staff G-4, told the board, morale within the Corps and to a lack of
though Moses himself favored some confidence, not only in higher quarters of
changes, saying it was essential that com- the Army but also among his own subordi-
munications "not be buried down below nates. In mid-1943 officer morale within the
and through some complicated chain of Signal Corps was reported as low, especially
commands as it is now. Where it belongs, I in the supply service.92 In high places Olm-
don't know." 89 Maj. Gen. Miller G. White, stead had failed to win backers. Too often
General Staff G-1, resisted the idea: "There he was out of his office, ill, or away on long
ought to be some way to control it [com-
trips. However right he may have been on
munications]," he said, "without creating a
many points and however devoted to his
new Division of the General Staff to do
it." 90 The head of the Army Ground Forces, work, to the Signal Corps, and to the Army,
General McNair, when discussing the unsat- as he certainly was, yet he was gruff
isfactory control exerted by such communi- and careless of human relations and the so-
cations boards as the JCB, said flatly, cial amenities. He had made many enemies.
"Rather than put the Signal Corps into the He had failed to compromise, perhaps, and
War Department [General Staff], I'd go for to play the game; he was, perhaps, set in the
a board. I think that would be the lesser of rigidity which comes from too rigorous de-
91
the two evils." These were the views that votion. When an officer loses the confi-
88
Proceedings of Board of Officers, 21 Jun 43, 92
The reasons given were too frequent organi-
attached to Memo, Col Burnap, Pres of Bd, for zational and procedural changes, shifting assign-
CofS, 22 Jun 43, sub: Transmittal of bd proceed- ments, incapable supervisors, lack of confidence in
ings. AG 311 (5-10-43) (1) Bulky Pkg, Army the higher echelons of the Corps, lack of recogni-
RG 207.03. Job A50-55. tion and interest from above, and so on. OCSigO
89
Proceedings of Board To Investigate Communi- R&W Action 1, Dir Control Div to CSigO, 14 Jul
cations, Tab Y, p. 1. 43, sub: Officer morale OCSigO, and R&W Action
90
Ibid., Tab X, p. 2. 1, Asst CSO to CSigO, 4 Aug 43, same sub. Deputy
91
Ibid., Tab BB, p. 2. CSigO Folder, 1942-45, p. 199. SigC Hist Sec File.
SIGNAL CORPS POSITION IN MID-1943 561
dence of his fellows, whatever the reason, Eritrea, in eastern Africa. "Our radio in-
his position becomes untenable, as General stallations at Eritrea," he said, "appear to
Bradley said of the American II Corps com- be too far to the rear. The same should be
mander, Maj. Gen. Lloyd R. Fredendall, moved to the vicinity of Cairo at the earliest
after the disaster at Kasserine Pass in North possible moment." Somervell added, "I un-
93
Africa. He had to be replaced. derstand that you have refused to give your
96
For many months previously things had consent to this and I wonder why."
not been going well between Olmstead and Actually, the huge ACAN station at As-
his superiors. General Marshall, receiving mara, Eritrea, occupied a strategic posi-
reports in October 1942 that the Signal tion in the equatorial belt of large Signal
Corps failed to handle messages properly, Corps radio stations where it could best
failed to meet personnel requirements, failed maintain its link in Army's round-the-world
to display vision and foresight in planning, connections.
had taken the charges to Somervell. In No- An especially ominous memorandum
vember of that year, Somervell had ex- came to Olmstead in mid-March. "All of
claimed to the Deputy Chief Signal Officer the reports," wrote Somervell categorically,
that just once he would like to see a letter "which I have received on combined op-
that said something good about the Signal erations variously called amphibious op-
Corps.94 erations, landing operations, indicate that
Olmstead's relations with Somervell de- the Army Signal System has fallen down
teriorated rapidly in early 1943. Somervell, during the operation. I want you to be sure
visiting Caribbean, areas, wrote that he had to remember the Chief of Staff's admoni-
been "shocked" at communication condi- tion in regard to your responsibility for
tions there, "after all the song and dance I seeing that the equipment is provided and
have received from Olmstead and Code." 95 that the training is adequate for the job."
Twice in February Somervell criticized Evidently, the breakdown of the radios
Olmstead, once touching unspecified prob- serving General Patton's headquarters
lems of communication, and then again, aboard the Augusta early in the North Afri-
specifying a Signal Corps radio station in can landings drew Somervell's attention
93
away from signal successes at other points
Omar N. Bradley, A Soldier's Story (New York: along the beaches.97
Henry Holt and Company, 1951), p. 41.
94
Log entries, 21 Oct, 14 Nov 42. Deputy CSigO In the end, Somervell's opinion of Olm-
Folder, 1942-45, pp. 66, 79. SigC Hist Sec File. stead sank impossibly low. He stated his
See also the comments of General Strong, General judgment in stark terms when he testified
Staff G-2, regarding the Signal Corps early in the
war. Proceedings of Board To Investigate Com- before the communications board on 4
munications, Tab U, pp. 1-2. June. Replying abruptly to the first ques-
95
Ltr, "Bill" [Somervell] to "Fat" [Styer], at-
tached to Memo, Styer for Handy, 18 Jan 43. tion, put to him by Colonel Burnap, who
OPD Exec 8, Bk 8, 4 Dec 42-12 Apr 43, Item 57.
96
The conditions which especially irked him seem to Memos, Somervell for Olmstead, 22, 26 Feb
have been in an AAF station at Borinquen, Puerto 43. Hq ASF File, SigC 1942-44, Drawer 6 (RG
Rico. An item in a Signal Corps file indicates that 200-ASF-Somervell).
97
Somervell was also troubled at communication con- (1) Memo, Somervell for CSigO, 13 Mar 43.
ditions at Recife, Brazil. Log entry, 29 Jan 43. Hq ASF File, SigC 1942-44, Drawer 6 (RG 200-
Deputy CSigO Folder, 1942-45, p. 70. SigC Hist ASF-Somervell). (2) See above, pp. 353-63,
Sec File. passim.
264-211 O - 78 - 37
562 THE SIGNAL CORPS
asked what might be done to improve Burnap added that General Somervell's so-
Army-wide communications, Somervell lution was not proposed by any other wit-
snapped back, "Get a new Signal Officer." ness. "Drastic organizational change is
"Will that answer all the questions," was mandatory," Burnap concluded." It was
the next query. "Yes," said Somervell. "Of accomplished within the Army Air Forces
command and control?" Burnap asked fur- a few weeks later. But the only change
ther. "Yes," came the reply. Somervell pro- within the Signal Corps was the swapping
fessed to believe that the established organi- of horses in the midstream of the war.
zation could be made to work without On 11 June 1943 Chief of Staff General
changes. The trouble was in the men in- Marshall informed his Chief of the Army
volved, or more precisely in General Olm- Service Forces, General Somervell, that he
stead. "I see no difficulties at all in the had dismissed the Chief Signal Officer. He
situation provided the Signal Corps is han- had had a "lengthy talk with General Olm-
dled by a man with some imagination and stead." The Chief Signal Officer "expressed
get-up and go to him," declared Somervell. a willingness to accept our decision in a
Another board member, Col. Carter W. soldierly manner. ... I told him," wrote
Clarke, asked, "In other words, to get rid Marshall, "that the decision was taken for
of the man you have there and get another his relief and General Ingles' appointment
man will solve the entire communication in his place at the head of the Signal Corps."
problem?" Somervell replied "Yes," and he Olmstead, wishing to continue his service
added, "Did you ever hear of Napoleon's in the war effort, hoped he might remain
remark that there weren't any poor regi- on active duty as head of an important com-
ments, there were just poor Colonels?" 98 munications board which the State Depart-
Obviously the personal side of Army's ment was about to set up. To this Marshall
communication problem was not the dom- consented, saying to Somervell, "We could
inant one, despite Somervell's brusque em- assign Olmstead to this job and allow him
phasis of it. Army signals had been and con- to remain on active duty at least for the
tinued to be a veritable Gordian knot. It time being." Somervell had readied a letter
was unfortunate that the personality of the of resignation for Olmstead to sign. Mar-
Chief Signal Officer in the spring of 1943 shall, though he had the letter at hand, for-
happened to figure large in the situation. bore presenting it. "I am attaching your
It provided what seemed an easy solution, draft," he wrote to Somervell, "of a letter
which in reality bypassed the real organiza- for him to sign which I did not use, pend-
tional difficulties. The board recommenda- ing consideration of the State Department
tions were turned down and General Olm- affair." 100
stead was turned out. As president of the Yet it seems that Somervell confronted
board, Colonel Burnap, in his report to the Olmstead at once with the draft letter and
Chief of Staff on 22 June, commented that got him to sign it. For such a letter appears
the board unanimously agreed Army com- in the records, dated 11 June and signed
munication and electronic troubles could by Olmstead, requesting retirement. This
not be solved by personnel changes only. 99
Memo cited n. 88.
100
Memo, G. C. M. for Somervell, 11 Jun 43.
98
Proceeedings of Board To Investigate Commum WDCSA 201 Olmstead, Gen. OCS (WDCSA) 201,
cations, Tab Z, pp. 1-3. Obear, Capt Geo (2 Dec 43).
SIGNAL CORPS POSITION IN MID-1943 563
request hardly accorded with the desire But of course Olmstead did not actually
Olmstead had just expressed to Marshall "retire at his own request." The War De-
saying that he hoped to remain in active partment had fired him. Yet he had done a
service. That this was the letter which good job, all obstacles considered. His ad-
Somervell had drafted is borne out by the ministration had cleared the ground and
reasoning it employed—professing weari- sown the seed from which not he but his
ness and urging a younger, more vigorous successors would gather a good harvest.103
successor (actually, Olmstead, age 59, had
General Ingles Inherits
returned from his trip invigorated, con-
Problems of Signal Control
fident, and high in hopes for the future of
the Signal Corps). The only papers touch- Olmstead's removal, by which General
ing the whole incident in the files retired Somervell had apparently hoped to slash
from Somervell's office are a copy of this through the Gordian knot of Army com-
letter together with Somervell's indorse- munications, settled Signal Corps' position
ment, also dated 11 June, stating, "General with respect to the General Staff for the
Olmstead has devoted himself without remainder of World War II. Instead of ex-
stint ... is entitled to relief from a re- panding its sphere of communications con-
sponsibility which has been exacting to an trol, the Corps would soon lose to the Army
extreme. ... I am appreciative both of Air Forces all development and procure-
his accomplishments and of the spirit in ment of their electronic equipment, and it
which his request to retire has been made. would lose to G-2 its signal intelligence ac-
I recommend approval. . . ." 101 tivities involving intercept and cryptanal-
The War Department had selected, as ysis. The problem of Army-wide communi-
Olmstead's successor, Maj. Gen. Harry C. cations control remained with General
Ingles. Ingles' long and varied career in Ingles. Another problem which he inherited
the Signal Corps had recently culminated in
for CofS, 19 Jun 43, sub: Appointment as CSigO.
important posts under Lt. Gen. Frank M. OCS (WDCSA) 201, Ikner, J. (12 Nov 43).
Andrews, commander in Panama and the 103
See, for example, the words of appreciation
Caribbean, where he had served first as from the Secretary of War, in Ltr, SW to Olm-
stead, 1 Jul 43. OCS (WDCSA) 201, Obear, Capt
Chief Signal Officer and then as Chief of Geo (2 Dec 43).
Staff. The new appointee took full com- Some months later, touching on a Distinguished
mand of the Signal Corps on 30 June, the Service Medal for Olmstead, General Marshall
had this to say: "The Secretary of War feels that
date of Olmstead's formal departure. "Gen- General Olmstead took over the Signal Corps at
eral Somervell," the Chief of Staff was ad- a time when it was in the doldrums and that
vised, "recommends the nomination of against heavy odds he brought it out of a very
serious situation. Therefore, despite the fact that it
Major General Harry C. Ingles as Chief was finally determined that he should be replaced,
Signal Officer of the Army, vice Major he had done an excellent job under great difficul-
General Dawson Olmstead, who retires ties." Memo, G. C. M. for ACofS G-1, 9 Oct 43,
sub: DSM for Olmstead. Same file.
June 30, 1943, at his own request." 102 General Olmstead was returned to active duty
for some weeks in the summer of 1943 to serve on
101
Ltr, Olmstead to CofS through CG ASF, 11 the Interdepartmental Telecommunications Com-
Jun 43, sub: Retirement, with 1st Ind, Somervell mittee, the State Department undertaking in which
to CofS, 11 Jun 43. Hq ASF File SigC 1942-44, he had told Marshall he wished to participate. See
Drawer 6 (RG 200-ASF-Somervell). papers contained in OCS (WDCSA) 676 (28
102
Memo, Brig Gen Miller G. White, ACofS G-1 Dec 43).
564 THE SIGNAL CORPS
was the continued shortage of qualified ordination and supervision, and for es-
officers, especially in the higher ranks. Hav- tablishment of over-all policy in communi-
ing lost more of these than it could afford cations, radar and allied fields." Before the
to the Air Forces, the Corps had too few summer's end General Arnold finally set up
to do its own work, notably in procurement, strong operational control over his air com-
let alone to provide able and persuasive munications, borrowing another of Signal
officers to furnish the staff work which was Corps' too few officers, Colonel Rives, to
everywhere needed. "Their [Signal Corps] assist General McClelland in this task.106
personnel is spread thin," General Moses, The new Signal Corps chief, General Ingles,
General Staff G-4, told the board investi- would do some reorganizing too, touching
gating communications in June 1943. supply and development. But he and his
"Damn few men know the game," he Corps remained hampered as to control
added.104
over the operation of Army communica-
What the Signal Corps lost in these
tions.
events of May and June 1943 became the
Air Forces' gain, an outcome which Col- The sole high-level co-ordinating and
onel Sarnoff had prophesied in late 1942.
105 controlling agencies remained the commu-
Urged on by the efforts of Dr. Edward nications boards. How important their serv-
Bowles, trouble shooter in the Secretary of ices were General Ingles realized as soon
War's office, Army Air Forces communi- as he took informal command of the Signal
cations were at last reorganized and im- Corps in mid-June. Within the first week
proved. On 16 June, in a forceful letter of his new responsibility he corresponded
to General Arnold, Bowles hewed to the with General Somervell on the subject. Lt.
line as he and many a Signal Corps officer Gen. Joseph McNarney, Deputy Chief of
saw it. Bowles' sharp criticism, while sting- Staff, had been annoyed at the slow inef-
ing the Air Forces especially, lashed all ficiency of the boards in getting important
the Army as well. signal tasks accomplished. Somervell was
At the present time, there is no strong con- similarly dissatisfied and believed further
sciousness of communications, radar and elec- that the boards occupied the time of far
tronics within the Army as a whole. Electrical
too many officers and committees. "It is
communications are still regarded as a com-
modity to be provided immediately upon re- reported that there are some 40 or 45 of
quest, like goods from a shopkeeper's shelf. these [committees and subcommittees], and
High staff planning agencies lack the essential of course this number is entirely too many
concept of communications as systems which to handle business promptly," Somervell
are fundamental in tactical planning and in wrote to Ingles. He added, "It is also re-
successful combat operations.
ported that there are some 245 officers en-
The Air Forces, he emphasized again and gaged on the work of the boards. The speed
and again, suffered from lack of communi- with which the job has been done has been
cations leadership, there being no one man
far below what is necessary."107
or staff "having the primary responsibility
106
for tactical and technical planning, for co- Memo, Bowles for Arnold, pp. 1-2, cited n.
37. See also Ltr, Bowles to R. A. Lovett, Asst SW
104
Proceeedings of Board To Investigate Commu- for Air, 26 Jun 43, and Memo, Bowles for SW,
nications, Tab Y, p. 2. 26 Jun 43, sub: Army Air Forces Com. All in OCS
105
Log entry, 12 Oct 42. Deputy CSigO Folder (WDCSA) 676 (28 Dec 43).
107
1942-45, p. 33. SigC Hist Sec File. Memo, Ingles, Actg CSigO for Somervell, 17
SIGNAL CORPS POSITION IN MID-1943 565
Ingles answered with vigor on 25 June. Board be then discontinued." Though In-
McNarney and Somervell had been misin- gles was not urging that he be moved out
formed. Total membership was 143 officers from under the Army Service Forces to the
and 22 civilians. The Combined Communi- General Staff in order to receive these pow-
cations Board had 23 committees and 6 ers, he was asking for the substance of Olm-
108
subcommittees. The same men and the same stead's goal.
committees served in the Joint Communi- General Somervell approved General In-
cations Board also. Their work was part- gles' recommendation and passed it on to
time only, performed by men who were General McNarney. But beyond and above
informed specialists in their fields: radar, the ASF stood other obstacles—General
frequency allocation, Countermeasures, Marshall's policies and General Arnold and
identification, codes and ciphers, and so on. his Air Forces ambitions. Ingles, in asking
They performed essential tasks and they to be allowed to co-ordinate and standardize
could not be eliminated, or even much re- Army communication procedure through-
duced. "In my opinion," Ingles declared, out the Army had specified that he have au-
"none of these Boards can be discontinued." thority in these matters over the AAF. This
He made one exception, the Army Com- apparently presented a situation which the
munications Board. And it could be elimi- AAF, or more specifically its chief, did not
nated, he added, on only one condition, want to entertain. In any event, General
namely, that the Chief Signal Officer in- McNarney, himself an Air officer, shelved
herit all the board's duties. General Ingles the entire proposition laconically with words
that have crushed many a high hope: "No
recommended "that the Chief Signal Officer 109
action, file."
be charged with the mission of coordinating
communication procedure throughout the 108
The new Chief Signal Officer did not demand
Army of the United States, that the Army for himself the powers of the ACB. He merely sug-
gested that if McNarney and Somervell wanted to
Ground Forces and the Army Air Forces be eliminate as many officers and committees as possi-
so advised by authority of the Chief of ble, this was one way of doing it. He said:
"Since all parts of the Army must operate closely
Staff, and that the Army Communications together in any modern campaign, coordination and
standardization of communication procedure is es-
Jun 43, with 1st Ind, Somervell to Actg CSigO, 17 sential. It is also essential from a supply point of
Jun 43. OCS (WDCSA) 676 (28 Dec 43). view in order to reduce to the minimum the dif-
Both McNarney and Somervell, like many other ferent types of equipment used and to assure that
busy administrators in the Army, could not grasp the three major divisions of the Army use the same
or keep abreast of the ever-widening sphere of elec- types of equipment insofar as possible. If the Chief
tronics. They understandably felt annoyed when of Staff desires that the Chief Signal Officer effect
confronted with the magnitude and complexity of this coordination and issues instructions to the
the field. General Stilwell with characteristic frank- Army Ground Forces and Army Air Forces to that
ness expressed what many officers must have felt, effect, the Army Communications Board can be
especially in the earlier years of the war. Speaking eliminated entirely. If the Chief of Staff does not
in May 1943 about CBI communications, Stilwell desire to take such action, the Army Communica-
confessed that they had been "handled very poorly, tions Board should continue to function, but it
principally due to my own ignorance. ... I don't could be reduced in size to one or two members
know anything about communications or signal from each of the three major forces."
work," he blurted. "I only wish," he told members Ltr, Ingles to CG ASF, 25 Jun 43. OCS
of the board investigating Army communications, (WDCSA) 676 (28 Dec 43).
109
"I knew something about your game." Proceedings Ibid., with 1st Ind, Somervell to Deputy CofS,
of Board To Investigate Communications, Tab B, 26 Jun 43, and McNarney's note for file (penned
pp. 1, 3, 4. by Col O. L. Nelson, Asst to Deputy CofS).
Bibliographical Note
The sources of this volume lie princi- Of general use to the historians in pre-
pally in the massive collection of Signal paring Volume II were the unpublished An-
Corps files, classified and unclassified, nual Reports of the Chief Signal Officer for
within the Departmental Records Branch of fiscal years 1942, 1943, and 1944, existing
the Adjutant General's Office and the Office in a few typed copies only So too were the
of the Chief Signal Officer. By laboriously weekly reports, variously called Progress Re-
searching through thousands of these file ports and Digest of Progress and Problems.
folders, the historians obtained the docu- General Olmstead initiated this system of
ments upon which the major portion of this weekly reporting by all his headquarters
book is built. The files of the Office of the divisions in September 1941. The reports
Chief of Staff and of the Army Service continued to be maintained throughout the
Forces provided numbers of pertinent war, constituting a running record of
papers, as did also certain files of the Army contemporary activity. A complete set is
Air Forces, notably their electronic equip- extant in the care of the Signal Corps
ment files and the histories of Signal Corps Central Files, where there remains also a
units which served under the AAF. A wide unique and valuable file, collected during
range of other sources was employed as well. World War II, known as the Code File or
The extent of that range has been ade- the File of the Deputy Chief Signal Officer.
quately marked out in the Bibliographical Another useful general file was the Sig-
Note of Volume I of the Signal Corps nal Corps Administrative Log, 1939-1945,
subseries. a collection of Office of the Chief Signal
The sources employed for Volume I were Officer organizational charts and changes.
put to use in the preparation of this volume This last, and the Chief Signal Officer's un-
whenever they applied to the limited time, published Annual Reports, are maintained
December 1941-June 1943, to which Vol- in the Signal Corps Historical Section
ume II is restricted. Some Volume I sources File, where also are collections of the
ceased publication before the opening date many interviews which the historians have
of Volume II, for example, the Signal Corps had over a period of years with Signal Corps
Bulletin. Its place was partly taken by the personnel and which have provided a mine
Signal Corps Information Letter, issued of information, both general and specific.
monthly throughout the war (it was re- An especially valuable general file of Signal
named the Signal Corps Technical Infor- Corps activities and problems within the
mation Letter in December 1942). A com-
views, reports, analyses, miscellaneous working
plete set is in the Signal Corps Historical papers, and the like, and completed monograph
Section File.* studies—which the Signal Corps historical office
began collecting in 1943 and is still adding to. The
*This often-cited file is a collection of all the file is a permanent collection in the Departmental
heterogeneous historical material—diaries, inter- Records Branch of the Adjutant General's Office.
BIBLIOGRAPHICAL NOTE 567
time span of this volume was the Proceed- Of particular concern to the historian
ings of Board to Investigate Communica- of Signal Corps research and development
tions, AG 311 (5-10-43) (1) Bulky Pkg, activity was the History of Signal Corps
Army RG 207.03. Research and Development in World War
An extensive collection of great general II, the R&D History, which was prepared
value was the Signal Corps Intelligence in the Engineering and Technical Division
Agency (SCIA) files. They include intelli- at the end of the war. It is a compilation
gence reports, observers' report, and other of laboratory reports and of Signal Corps
important documents which accumulated in actions on hundreds of new equipment
the Plans and Operations Division, Office of items. The compilation runs to fifteen mon-
the Chief Signal Officer, and which were ograph volumes and parts, the ribbon copy
turned over to the Signal Corps Intelligence of which is in the Signal Corps Historical
Agency after World War II. They are pre- Section File. In the same file a monograph
served in the Departmental Records Branch, entitled Historical Report of the Signal
Adjutant General's Office, under job lot Corps Engineering Laboratories, the SCEL
A51-135, with SCIA file numbers and titles History, covering the period from 1930
added. Each SCIA item cited in this volume through 1943, proved helpful. The retired
is designated as a SCIA File with appropri- files of the wartime Communications Co-
ate number and title. ordination and Equipment Division in the
The Signal Corps files or studies that were Office of the Chief Signal Officer provided
prepared specifically for the historical numbers of so-called C&E cases, dealing
record are small in number, but they seem with various equipment items and with
of sufficient worth to list here. Although the problems relating to their use. Of particu-
following lists of titles may appear impres- lar value in the treatment of radar were
sive, the several dozen compilations they Dr. James Phinney Baxter's Scientists
represent were few by comparison with the Against Time (Boston: Little, Brown and
great number of varied office files which Company, 1946) and Dr. Henry E. Guer-
provided the primary sources for the vol- lac's extensive monograph history of the
ume, as has been pointed out. Some of these Radiation Laboratory (under the National
specifically historical records, such as those Defense Research Committee) entitled Ra-
of the Alaska Communication System and dar, prepared in the Historical Division of
certain development and supply installa- the Office of Scientific Research and De-
tions, were the result of Signal Corps field velopment. A photostat copy of the entire
activities. The largest group of these specifi- monograph in its several parts, each sepa-
cally historical studies are the monographs rately paginated, was obtained for the Sig-
prepared by the wartime Signal Corps His- nal Corps Historical Section File. The pages
torical Section (1943-1947). They are on were renumbered consecutively from be-
ginning to end, and it is to this particular
file both in the Office of the Chief of Mili-
copy of Dr. Guerlac's work that the many
tary History and in the Signal Corps His-
references in this volume are made.
torical Section. A list of these secondary Notable sources in procurement and dis-
sources which contributed in varying degree tribution matters were the Weekly Statisti-
to the preparation of this volume appears at cal Reports, or Summaries, which were
the. end of this note under Monographs. issued first by the Office of the Under Sec-
568 THE SIGNAL CORPS
retary of War and later by SOS headquar- System History, contains 17 chapters, 263
ters. A number of industrial summaries, pre- pages, and covers the period 1900 to 1 Jan-
pared at the Philadelphia Signal Corps Pro- uary 1943. Parts II and III are titled His-
curement District office, were helpful, such tory of the Alaska Communication System
as H. C. Shute's Industrial Summary: Sig- and cover the period 1 January 1942 to
nal Corps Procurement of Dry Batteries and August 1945. Part II is in 3 volumes and
W. P. Worrell's Industrial Summary: Sig- contains 18 chapters, 339 pages. Part III,
nal Corps Materials and Resources. Fur- in 8 volumes, contains 39 chapters, 913
ther sources were several monograph his- pages. The ribbon copy is in the Signal
tories, not included in the letter-number Corps Historical Section File. In this vol-
series prepared by the wartime Signal Corps ume Part I is cited as First Draft, History
Historical Section, such as accounts of the of ACS, with appropriate page numbers,
big Signal Corps depots at Philadelphia, and Parts II and III as Hist of ACS, with
Lexington, Chicago, Seattle, and elsewhere. appropriate part and chapter.
In the same category fall still other Signal Noteworthy among sources for theater
Corps historical efforts, such as Morton H. studies were Sgts. John and Ward Hawkins'
Ullery's typescript two-volume History of History of the 835th Signal Service Bat-
the Storage and Issue Agency, 1946, and talion 1942-1945 in the China-Burma-In-
James J. Cerruti's four-volume Historical dia theater; the reports and papers of Col.
Narrative of the Philadelphia Signal Corps T. T. Teague, Signal Officer, U.S. Forces in
Procurement District, 1945. All are in the the Philippines, for the account of commu-
Signal Corps Historical Section File, except nications at the time of the fall of the Phil-
the statistical reports. ippines; the many SCI A reports; and the
Of value to photographic studies was History of the Signal Section AFHQ, 24
The Summary Report on Photographic Ac- July 1942-10 November 1945. All are lo-
tivities of the Signal Corps Since August 4, cated in the Signal Corps Historical Section
1941, in the Fields of Motion Pictures and File, except the SCIA reports, which are in
Visual Aids, an extensive report dated 26 the retired files of the Signal Corps Intel-
February 1943, which is referred to in this ligence Agency.
volume as the APS Summary Reports. An- Finally, note must be made of the rec-
other useful source for the later months of ords of Congressional investigations, which
the photographic story were the so-called provided useful sources. In photographic
Harrison files in AGO Departmental Rec- studies, the Truman Committee Report
ords Branch. They comprise a collection of (Sen. Spec. Committee, 78th Cong., 1st
over one hundred personal file folders main- Sess., Hearings, Investigation of the Na-
tained by Maj. Gen. William H. Harrison, tional Defense Program, Pt. 17, Army Com-
chief of the Army Pictorial Service, while missions and Military Activities of Motion
it was on the Army Service Forces level. Picture Personnel, Jan-Apr 43) was used.
Valuable to the historian of Signal Corps' Particularly valuable to any study of the
Alaskan responsibilities was the History of Hawaiian theater at the time of the Pearl
the Alaska Communication System, 1945. Harbor attack is the printed report of the
The bound manuscript copy entitled First Joint Committee on the Investigation of the
Draft [Part I], Alaskan Communication Pearl Harbor Attack (which is printed
BIBLIOGRAPHICAL NOTE 569
elsewhere as well and is also included in tack of December 7, 1941, on Hawaii, 2,173
the MS File of the Pearl Harbor Hearings pp.
in the Departmental Records Branch of the ————, Ibid., Pt. 26, Proceedings of
Adjutant General's Office). The printed [Admiral Thomas C.] Hart [USN, Ret]
report constitutes 40 volumes, generally Inquiry, 565 pp.
known by the short title, Pearl Harbor At- ————, Ibid., Pts. 27-31, Proceedings of
tack. Of these, the first—unnumbered— Army Pearl Harbor Board, 3,357 pp.
volume is devoted to the reports of the ————, Ibid., Pts. 32-33, Proceedings of
Joint [Congressional] Committee on the Navy Court of Inquiry, 1,397 pp.
Investigation of the Pearl Harbor Attack ————, Ibid., Pt. 34, Proceedings of
that brought the whole series to official pub- [Colonel Carter W.] Clarke [USA] Investi-
lication. The other parts, numbered 1 gation. . . Pursuant to Oral Instructions
through 39, comprise the hearings, exhibits, of the Chief Staff, U. S. Army, Testimony
and reports of the eight several investiga- and Findings Concerning Handling of Cer-
tions to which the Japanese war action gave tain Top Secret Documents, 225 pp.
rise. ————, Ibid., Pt. 35, Report of Investi-
The complete description of the series is gation by Lt. Colonel Henry C. Clausen,
as follows: JAGD [AUS] for the Secretary of War,
Joint Committee, 79th Cong, 1st and 2nd Supplementary to Proceedings of the Army
Sess, Investigation of the Pearl Harbor At- Pearl Harbor Board, 695 pp.
tack (Reports of the Joint Committee), ————, Ibid., Pts. 36-38, Proceedings of
Sen Doc 244 (Washington, 1946), 580 pp.
Inquiry . . . Conducted by Admiral
————, Pearl Harbor Attack, Pts. 1-11
Henry Kent Hewitt, U. S. Navy, in Ac-
(Hearings of the Joint Committee, 15 Nov
45-31 May 46), 5,560 pp. cordance with a Precept Dated 2 May 1945,
————, Ibid., Pts. 12-21 (Exhibits of from the Secretary of the Navy, 1,341 pp.
the Joint Committee Hearings), 4,780 pp. ————, Ibid., Pt. 39, Reports, Findings
————, Ibid., Pts. 22-25, Proceedings and Conclusion of Roberts Commission,
of Roberts Commission [Associate Justice Army Pearl Harbor Board, Navy Court of
Owen J. Roberts, U. S. Supreme Court, Inquiry, and Hewitt Inquiry, with Indorse-
Chairman] to Investigate the Japanese At- ments, 527 pp.
570 THE SIGNAL CORPS
Monographs
Letter-number
designation Author (s) Title
A-2 Capt Harry M. Davis Signal Corps Development of U.S. Army
Radar Equipment, Pt II, 1937-1941
A-3 Pt III, Long Range Radar, SCR-270-271
B-l Andre E. Gerard The Story of Supply in the Signal Corps in
World War II, Pt I, Requirements
B-1b Pt II, Procurement
B-1c Pt III, Production
B-1d Capt Charles R. Novick The Story of Supply in the Signal Corps in
World War II, Pt IV, Distribution
B-3 James V. Clarke Contract Adjustment in the Signal Corps,
1 July 1939-15 August 1945
B-5 André E. Gerard Activity and Participation of the Signal Corps
in Foreign Procurement and Lend-Lease
B-14 Ralph H. Clark Expediting Activities of the Office of the Chief
Signal Officer, August 1941-June 1944
B-15 Mary-louise Melia The Quartz Crystal Program of the Signal
Corps, 1941-1945
B-16 Capt Charles R. Novick The Signal Corps Policy of the Conservation of
Critical and Strategic Materials
G-1 Capt Frederick Reinstein Signal Corps Training in World War II:
Background and First Six Months of War,
1917-1942
C-3 Marvin L. Ingram The Civilian Training Program of the Signal
Corps in World War II: Pt I, Pre-Service
Training on the Vocational Level
C-3a Pt II, Pre-Service Training on the College
Level
C-4 Ruth F. Sadler History of the Signal Corps Affiliated Plan
G-5 History of the Electronics Training Group in
the United Kingdom
C-6 Capt Frederick Reinstein Training Study of the Signal Corps Officer
Candidate School, 1939-1944
C-8 Study of Signal Corps Enlisted Schooling,
1939-1944
C-9 Study of Signal Corps Replacement and Filler
Training, 1941-1944
D-l Dr. Courtney R. Hall Development of the Office of the Chief Signal
Officer
D-2 Signal Corps Participation in Boards and Com-
mittees
E-l Capt Sidney L. Jackson Stringing Wire Toward Tokyo: A Brief History
of the Alaska Military Highway Telephone
Line
E-1a Fixed Wire, NATOUSA: Chapter I of Theater
Fixed Networks
E-1d Communications in the Persian Gulf Command:
Chapter IV of the Theater Fixed Networks
E-2b Radnese "100": Chapter II of International
Radio Circuits
BIBLIOGRAPHICAL NOTE 571
Letter-number
designation Author(s) Title
E-3a Capt Sidney L. Jackson Tactical Communication in World War II, Pt
I, Signal Communication in the North African
Campaigns
E-4a 1st Lt Charles R. Novick A Story of Signal Communications in Iceland
E-5a Mary E. Boswell The 17th Signal Service Company, A Com-
ponent of the War Department Signal Cen-
ter from World War I through World War II
E-5b Pauline M. Oakes The Army Command and Administrative Com-
munications System, Pt II, Signal Corps
Domestic Communications Network as Ex-
tended to Overseas Terminals FY 1941-15
August 1945
E-6 Dr. Donald O. Wagner Army Command and Administrative Network,
1941-1945: Pt I, The Pacific; Pt II, China-
Burma-India
E-7 Capt Frederick Reinstein Signal Corps Fixed Communications in the
European and Africa-Middle Eastern The-
aters
E-10 Mary-louise Melia Signal Corps Fixed Communications in World
War II: Special Assignments and Techniques
F-1 Jacqueline M. Quadow Training Films in the Second World War
F-2a James V. Clarke Signal Corps Army Pictorial Service in World
War II (1 Sep 39-16 Aug 45)
F-2b Robert L. Eichberg and Jacque- Combat Photography
line M. Quadow
F-4 Mary E. Boswell A Study of Signal Corps Contributions to
V-Mail through 1943
F-5 A Study of Signal Corps Contribution to V-Mail
Through 1943, Suppl. Dec 43-Aug 45.
List of Abbreviations
AA Antiaircraft
AACS Army Airways Communications System
AAF Army Air Forces
AAFSAT Army Air Forces School of Applied Tactics
AAG Air Adjutant General
AARS Army Amateur Radio System
AB Air Base
AC Air Corps or alternating current
AC&EC Army Communications and Equipment Coordination
ACAN Army Command and Administrative Network
ACB Army Communications Board
ACD Army Communications Division, OCSigO
ACofAS Assistant Chief of Air Staff
ACofS Assistant Chief of Staff
ACS Alaska Communication System
Actg Acting
ADC Alaska Defense Command
Adm Administrative
AF Air Forces or air force
AFACT Assistant Chief of Air Staff, Training
AFCC Air Force Combat Command
AFHQ Allied Forces Headquarters
AFofL American Federation of Labor
AFMIDPAC Army Forces, Middle Pacific
AFRDB Air Force Research and Development Branch
AFTSC Air Force Technical Service Command
AG Adjutant General
AGCT Army General Classification Test
AGF Army Ground Forces
AGL Airborne gun laying
AGO Adjutant General's Office
AI Airborne interception (radar)
AM Amplitude modulation (radio)
AMET Africa-Middle East Theater
AN Army-Navy
ANCPEA Army-Navy Communications Production Expediting
Agency
LIST OF ABBREVIATIONS 573
*Com is used throughout this volume as the abbreviation for both communication and
communications in accordance with Army practice during the war period, although Signal Corps
men used the abbreviation comm.
LIST OF ABBREVIATIONS 575
G-1 Personnel Section of the War Department General Staff,
or of any other headquarters on the division level or
higher
G-2 Military Intelligence Section
G-3 Operations and Training Section
G-4 Supply Section
GCI Ground-controlled interception (radar)
GCT Greenwich Civil Time
GD General Development
GHQ General Headquarters
GL Gun laying (radar)
GO General Order
Gp Group
GSA General Services Administration
GSC General Staff Corps
Hist History or historical
HPG High Power Group
HUSAFMIDPAC Headquarters, United States Army Forces, Middle Pacific
I&M Installation and Maintenance
IBM International Business Machine Corp.
IFF Identification, friend or foe (radar)
IGD Inspector General's Department
ILS Instrument landing system
Ind Indorsement
Inf Infantry
Inspec Inspection
Instl Installation
Intel Intelligence
Interv Interview
IRE Institute of Radio Engineers
ISIB Inter-Service Ionosphere Bureau
JAGD Judge Advocate General's Department
JAGO Judge Advocate General's Office
JANP Joint Army Navy Procedure
JCB Joint Communications Board
JCS Joint Chiefs of Staff
Jt Joint
KW Kilowatt
LAB Low altitude bombsight
LCP Landing Craft Personnel
LRN Loran (navigational radar aid)
Ltr Letter
LW Light warning (radar)
576 THE SIGNAL CORPS
Prod Production
Prog Progress
Proj Project
PSCPD Philadephia Signal Corps Procurement District
PTT Postes, Telegraphes et Telephones
Purch Purchasing
R&AC Radar and Air Communications
R&D Research and Development
R&R Routing and Record (sheet, in AAF office usage)
R&W Routing and Work (sheet, in SigC office usage)
RAAF Royal Australian Air Force
RAF Royal Air Force
RCA Radio Corporation of America
Rcds Records
RCM Radio/radar Countermeasures
RDF Radio direction finding (a term for radar before early 1942)
or radio direction finder
Res Reserve
Ret Retired
Rqmts Requirements
RI Radio Intelligence
RL Radiation Laboratory (at MIT, radar research for NDRC)
ROTC Reserve Officers Training Corps
RPF Radio position finding (a term for radar before early 1942)
or radio position finder
RPL Rapid pole line (a type of pole line construction)
Rpt Report
RR Radio recognition (radar, similar to IFF)
RTC Replacement Training Center
Rtty Radioteletype
S&I Storage and Issue
SADU Sea Search Attack Development Unit
SAS Signal Airways Service
SAW Signal Aircraft Warning
SC Signal Corps
SCASS Signal Corps Aircraft Signal Service
SCEL Signal Corps Engineering Laboratories
SCGDL Signal Corps General Development Laboratory
SCGSS Signal Corps Ground Signal Service
SCIA Signal Corps Intelligence Agency
SCL Signal Corps Laboratories
SCPC Signal Corps Pictorial Center
SCPL Signal Corps Photographic Laboratory
264-211 O - 78 - 38
578 THE SIGNAL CORPS
*The volumes on the Army Air Forces, published by the University of Chicago Press, are not
included in this list.
UNITED STATES ARMY IN WORLD WAR II 587
Special Studies
Three Battles: Arnaville, Altuzzo, and Schmidt
The Army Corps
Pictorial Record
The War Against Germany and Italy: Mediterranean and Adjacent Areas
The War Against Germany: Europe and Adjacent Areas
The War Against Japan
INDEX
A. P. Hill Military Reservation, Va.: 351n, 398 Aircraft Warning Department. See under Signal
A to H project. See Carrier equipment and Corps School, Fort Monmouth.
systems. Aircraft Warning (Service): 24-26, 97, 100, 101,
Abadan, Iran: 408n, 450, 458 209, 234-35, 290-96, 302
Abbott, Norman A.: 275 in Alaska: 143-45, 487
Abramowitz, Maj. Reuben: 198 in Caribbean areas: 308-09
Academy of Motion Picture Arts and Sciences, in CBI: 304, 463-64
Research Council: 40, 389, 396, 397, 419, 421, in Hawaii: 3-8, 15
422, 423-24 in Panama: 100-102, 106-07, 306-08
Accra, Africa: 288n, 310, 311, 360, 363, 364, 430, in the Philippines: 11—15
450-51, 452, 454 Signal Corps training for: 24-26, 54-57, 189,
Acme Pictures: 395 212-17, 318
Acorn Insulated Wire Company: 513 Signal Corps troops for: 23-26, 45
Adak, Alaska: 416, 486-87, 489 Signal Corps units for: 37, 296
Addis Ababa, Abyssinia: 456 in South Pacific areas: 475, 477
Adelaide River, Australia: 300, 467 Air-to-surface vessel (ASV) radar. See Radar,
Aden, Arabia: 288n, 310 ASV; SCR's-517 and 521.
Adjutant General, The: 36, 394 Aishihik, Canada: 142
Advisory Council. See Signal Corps Advisory Aitutaki: 290, 475, 476
Council. Akin, Brig. Gen. Spencer B.: 12, 17, 18, 56, 117,
Affiliated Plan: 39-40, 44, 316-17 119, 288n
improvement of, since World War 1: 39
Alaska: 23, 34-35, 123-46 passim, 281, 290, 406,
and the photographic industry: 389, 419
430, 481-90
Africa: 106,309-11,317,430,433,450-58. See
also North Africa (Theater). Alaska Communication System: 123-46 passim,
Agra, India: 305n, 466 327, 487-90
Agricultural and Mechanical College of Texas: 47n and AACS communications for Northwest Ferry
Ahwaz, Iran: 458, 459 Route: 141-42
Air Corps. See Army Air Forces. Anchorage control station: 125
Air Defense Board: 24 and communications for Canol: 141
Air Ministry, British: 80, 95, 106, 210, 379 expansion of radio networks: 126-29, 131—35,
Airadio, Incorporated: 168 487-90
Airborne intercept radar. See Radar, A1; SCR's- growth of, to mid-1942: 146
520, 540, 720. number of radio operators, early 1942: 124
Aircraft Accessories Corporation: 169, 184 ocean cable systems of: 125, 131, 143, 489
Aircraft Radio Corporation: 31, 78, 79 and radio communications for Alcan Highway:
Aircraft Radio Laboratory: 43, 61, 63, 177, 180, 137, 483-84
281, 527 radio stations of, early 1942: 124
Air Navigation Unit: 83 responsibilities of, for aircraft warning systems
and development of aircraft radar
in Alaska: 143-45
to mid-1942: 83-91
responsibilities of, in Alaskan defense: 123-24
to mid-1943: 242n, 243, 247-48
and development of aircraft radio school at Seattle: 124
to mid-1942: 78-83 supply problems of: 135—36
to mid-1943: 237-41 telephone construction projects: 482-86, 487,
Inspection Section: 239 488, 489. See also Alcan Highway,
Radar Division: 247 traffic handled by, 1942: 146
Radar Unit: 84, 85 transportation difficulties of: 145
590 THE SIGNAL CORPS
Alaska Defense Command: 124-26, 131, 139, 142, Anglo-Iranian Oil Company: 459
143. 486, 488 Angmagssalik, Greenland: 288n, 289
radio stations of: 124-25, 131-33, 142 Ankara, Turkey: 456
telephone construction, to mid-1943: 486 Ankenbrandt, Maj. Gen. Francis L.: 288n, 338,
Alaska Railroad: 125, 486 447-48, 468-81 passim, 525
Alberta Government Telephones: 139 AN/MPG-1: 257
Albrook Field, G. Z.: 100,219,279 Annette, Alaska: 124, 125, 142, 143
Akan Highway: 77, 130, 136-41, 341, 436, 482 Antenna diversity: 222-23,447
pole line along. See Poles and pole lines. Antennas (and antenna poles) : 19n, 116, 129, 130,
Aleutian Islands: 123, 129-30, 136, 141, 142, 143, 134, 260, 285, 310, 363, 433, 449, 455
144. 255, 281, 416, 481, 486-90 airborne: 239n, 240
Algiers and Algeria: 340-80 passim, 399-400, for ASV radars: 90-91, 250, 252-53
408n, 430, 452-54, 457 for IFF radar: 269
Allahabad, India: 115, 304, 305 for MEW radar: 274-75
Allen, Lt. Col. Edward A.: 194 rhombic: 35, 114, 118, 455n
Allied Force Headquarters: 188, 313, 344-71 for SCR-578: 82-83
passim, 398, 399, 452, 538n, 541 for SCR-584: 265, 266n
AFHQ Signal Center: 363, 454 Antiaircraft Artillery Board: 265, 266, 273, 529
combined signal center: 346 Antiaircraft Artillery Command: 266, 267, 268,
Allsopp, Lt. Col. Cinton B.: 336n, 446 271-72, 529
Altimeter: 84, 243-46. See also SCR's-518, 618, 98th Antiaircraft Regiment: 6
718; AN/APN-1. AN/TPS-3: 263
FM radar type: 245 AN/TRC-1: 237, 373
pulsed radar 'type: 243 Anzio, Italy: 265
Aluminum: 164-65, 493 Appropriations
Aluminum Company of America: 164 budgetary computation methods: 147-48
Amateur Procurement Program: 281, 433 first billion dollar: 148
Amateur radio: 16, 22, 39n, 433 for 1941: 147
stations closed December 1941-January 1942: 39 for 1942: 148
Amberly Field, Australia: 303n for photographic services, 1942-43: 418, 426
Amchitka, Alaska: 487, 488 Arlington Hall, Va.: 204, 444, 445n. See also
American Machine Foundry Corporation: 266n Signal Security Agency.
American Phenolic Corporation: 157, 169 Armored Force: 60, 218, 229, 232, 233, 320, 492,
American Standards Association: 153, 530
526
American Telephone and Telegraph Company:
radio sets for: 71-72, 76, 229-32
28, 39, 104, 219, 222, 223-24, 341, 367, 483, units
543 1st Armored Battalion: 455n
facilities of, leased to Signal Corps: 312, 429 1st Armored Division: 71, 72, 348, 353, 354,
patents held by: 334 356, 357, 381, 382, 385, 525
American Volunteer Group: 305 2d Armored Division: 71, 72, 348, 349, 361
Amphibious communications: 199, 347-48, 365- 1st Armored Regiment: 386
67, 561 37th Armored Regiment: 230
in the North Africa landings: 353-62, 547 Armored Force Board: 71
requiring strong control: 547, 550
Army Air Forces (AAF) : 7, 10-11, 12, 13-15, 38,
Amphibious Force: 343
Amplidyne: 273-74
60, 106, 138, 139, 141-42, 181, 226, 277-96,
321, 323, 373, 447, 448, 450, 473, 510, 538-65
Anaconda Wire and Cable Company: 184
passim. See also Army Airways Communica-
investigation of wire fraud: 511-13
tions System.
AN/APN-1: 245
Air Service Command: 180, 295, 303, 434, 465,
Anchorage, Alaska: 124-45 passim, 486
466, 539
Ancon: 537
Air Transport Command: 145, 155, 438, 447,
AN/CPS-1: 265, 274 449-50, 451-52, 457, 475, 527
Anderson, Maj. Gen. Jonathon W.: 348 Communications Office (Directorate of Commu-
Andimeshk, Iran: 312, 458, 459 nications) : 242, 252, 438, 540, 548
Andrews, Lt. Gen. Frank M.: 22, 98, 107, 108, 260, problems of signal control in: 540, 548-50, 564
261, 307, 308, 563 Signal Corps equipment for: 31-32, 78-101,
Andrews, Col. Fred: 131, 135, 278n 234-56
INDEX 591
Army Air Forces (AAF)—Continued Army-Navy Nomenclature System. See Equip-
Signal Corps troops and training for: 23-26, 37, ment, nomenclature.
40-41, 45, 52, 188-217 passim, 338-39, 452, Army and Navy Staff College: 374
539 Army Pictorial Board: 423
technical school of: 247, 249 Army Pictorial Service. See also Photographic
Technical Services: 245 troops; Photography; Signal Corps Photo-
training films for: 392-93, 413n, 422 graphic Center; Still pictures; Training films;
Army Air Forces Ferrying Command Net: 434 V-Mail.
Army Air Forces School of Applied Tactics: 261, activities of: 390, 537
379 advisory service on film utilization: 413—14
Army Airways Communications System (AACS) : appropriations for, 1942-43: 418, 426
241, 277-89, 294, 427, 436, 437, 447-52 assigned research responsibility for photographic
in Africa and Middle East: 309-10, 449-52, 458 equipment: 410
in Alaska: 123, 141-43, 488 contracting responsibilities for photographic
in Caribbean areas: 219, 224, 307-08 supplies: 411
in Pacific areas: 19, 20, 463, 474-75 and films for Special Services WDGS: 414-16
Signal Corps installation problems for: 282-88, growth of, 1942 to mid-1943: 426
295, 448, 474-75 investigation of, 1942-43: 419-24
Signal Corps provision of personnel for: 277—80, organization in London: 398, 399
435, 444, 448, 452 recommendations for improving combat photog-
Technical Division of: 438 raphy, 1942: 403-04
Tenth Region of: 304 and relations with the AAF: 392-94
Twentieth Region of: 475 relations with the film industry: 389, 396, 419-
Army Amateur Radio System: 39 24
Army Command and Administrative Network reorganization of, 1942: 421-25
(ACAN): 38, 103, 106, 305-06, 429-30, responsibilities for photo-mail. See V-Mail.
432-35, 447, 536-37 staff supervision of corps area photographic labor-
in Africa and Middle East: 108, 310-11, 363, atories: 412
449-50, 452-60 status of, mid-1943: 425-26
basic design of: 427-29 training facilities of: 394-96
in Caribbean areas: 307 Army Postal Service: 408n
in CBI: 114, 303,463 Army Service Forces (ASF). See Services of
cost of: 433 Supply.
equipment for: 218-19, 221, 223n Army Specialist Corps: 207, 316
organization of: 435-47 passim Army Supply Program (ASP): 148, 166, 335, 502,
in Pacific areas: 109, 112, 296-97, 298, 299, 481 507, 521, 533-34, 536n
station call letters: 289n Army War College: 389, 392
world belt-line of: 210, 433, 458, 463, 467, 561 Arnold, Col. Calvert H.: 44, 111, 112-13, 299-302
Army Communications Board: 492, 525, 544, 554,
Arnold, Lt. Gen. Henry H.: 23, 60, 251, 282, 314,
555, 556, 557, 558, 565
Army Communications Commercial Agency: 439
546
Army Communications Division. See under Of-
and AACS problems: 219, 284, 286, 287, 438
fice of the Chief Signal Officer.
and AAF communication problems: 548. 549,
Army Full Period Telephone Network: 430, 434 564, 565
Army General Classification Test: 41, 200, 206, on airborne radar: 87, 250, 254, 255, 377
208, 215, 321 on airborne radio: 79, 80, 82-83
Army Ground Forces: 60, 189, 212, 529, 538, 539, and aircraft warning: 235, 258, 295
540, 546, 548, 557, 558, 565 and photography: 392, 393
photographic needs: 394-95, 405, 421 on Signal Corps production and supply: 246,
pressure for GL radar SCR-584, late 1942: 270- 271, 281
74 Arnold, Lt. Robert: 12
Army-Navy Communications Production Expedit- Aruba, Dutch West Indies: 308
ing Agency: 173 Arzeu, Africa: 356, 365
Army-Navy Electronics Production Agency: 139, Asansol, India, communications for RAF squadrons
173n, 270, 272n, 333 at: 115
Army-Navy Lens Board: 410 Asbury, Capt. Joseph M.: 498
Army-Navy Munitions Board. See Joint Army Ascension Island: 107, 108, 288n, 290, 294, 309-
and Navy Munitions Board. 10, 449, 450, 490
592 THE SIGNAL CORPS
Asheville, N. C.: 438 Bendix Radio Corporation: 31, 81, 149, 160, 162,
Asmara, Eritrea: 108, 114-15, 305, 310-12, 430, 169, 170, 239-40, 328, 329, 330
433, 452, 455-56, 458, 463, 561 factory at Towson, Md.: 494
Assam Province, India: 115, 463, 464n Bengasi, Africa: 456, 457, 458
Associated Press: 395 Berg, Russell A.: 372
Astoria, Long Island, N. Y.: 197, 390, 393, 395, Bermuda: 34, 282, 290, 294
404, 411, 419 Bernadou: 399
Atka, Alaska: 486, 487-88 Bethel, Alaska: 124, 133, 142, 143, 145
Atkinson Field, British Guiana: 308, 449, 527 Bethlehem, Pa.: 232
Atlanta, Ga.: 431, 515 Beyer, 1st Lt. Donald: 489
Atlanta Signal (ASF) Depot: 179, 515 Bickelhaupt, Col. Carroll O.: 21, 336n, 337, 543
Attu, Alaska: 130, 143, 487, 488, 489 Big Delta, Alaska: 131, 133, 141
Atwater-Kent Corporation: 182 Biloxi, Miss.: 440
Auckland, N. Z.: 470, 473, 476 Birdum, Australia: 300
Augusta: 348,350,357,359-60,561 Black, Lt. Col. Garland C.: 44
Australia: 18, 29-30, 77, 111-13, 118, 223, 290- BLADE Force, communications for: 380
303 passim, 317, 437, 463, 467-68, 500, 524 Blair, Maj. William P.: 225, 227
Avon, Ky.: 182 Bliley Electric Company: 170
Board of War Communications: 440
Back, Lt. Col. George I.: 44 Boehme (high-speed radio): 9, 78, 112, 219, 221,
Baffin Island: 277, 289n 222, 296-97, 311, 433, 436, 463, 474
Baghdad: 458 BOLERO: 221, 239, 242, 283-306 passim, 338-42
Bagnall, Maj. Vernon B.: 224, 236n Bombay: 280, 305n, 466
Baguio, P. I.: 18 Bombing-through-overcast radar. See R a d a r ,
Bailey, Austin: 224 American sets, ETO.
Baldwin, Long Island, N. Y.: 224 Bone, Africa: 370, 376, 377, 378, 379, 400
Bandar Abu Shehr, Iran: 458 Bora-Bora: 288n, 290, 475, 477
Bandar Shahpur, Iran: 458, 459 Borinquen Field, P. R.: 107, 219, 308, 561n
Bandoeng, Java: 18, 116 Boston, Mass.: 91, 221, 258, 288, 326
Bangalore, India: 115, 304, 305n, 466 Boston Regional Labor Office: 496, 499
Barhapjan, India: 305n Boston Signal Depot: 499, 515
Barrackpore, India: 466 Boufarik, Africa: 454
Barrett, Lt. Col. Roland C.: 390n Bougie, Africa: 400
Bartlett, Capt. Henry H.: 139 Boundary, Alaska. See Northway.
Basra, Iraq: 108, 312, 456n, 458, 459 Bower, Maj. M. M.: 229n, 370
Bowles, Dr. Edward L.: 91, 274, 564
Bataan: 19, 21, 109, 116-17, 119-20, 187, 298
on Army and AAF communication inadequacies:
Batteries: 349, 362, 501, 519, 524
primary ( d r y ) : 119, 174, 497, 516 540-41, 548n
ascribed communication control to the communi-
procurement problems: 497-98, 506
secondary (storage) : 349n cations boards: 552-53, 555
Battery Cove, Va., WAR receiver station at: 431 on ASV radar: 254-55
Bayer, Col. William L.: 63, 247 on need for strong communication control:
Beach, 1st Lt. Charles M.: 134 546-47, 550
Beacons. See Navigational electronic aids. visited Panama radar installations: 260, 307, 309
Beane Field, St. Lucia: 308 Bown, Dr. Ralph: 260, 309
Beasley, Col. William A.: 432 Boyer, Maj. E. E.: 229n
Beaufort Bay, Guadalcanal: 479 Bradley, Gen. Omar N.: 427, 561
Béja, Africa: 382, 400 Bradley Beach, N. J.: 238
Brazil: 106, 287, 309, 449-50, 501
Belgium: 500 a source of quartz crystal: 161, 233
Bell Aircraft Company: 240 Brazil: 114
Bell Telephone Laboratories: 58-67 passim, 71, 87,
Breene, Col. Robert G.: 245
104, 139, 162, 224, 226, 227, 263, 268n, 309,Brereton, Maj. Gen. Lewis H.: 10, 11
379 Brett, Lt. Gen. George H.: 261
Belmar, N. J.: 62n, 63, 213, 262, 323 Brisbane, Australia: 29-30, 111, 112, 113, 298-303,
Belmont Radio Company: 171, 329 408n, 433, 463-74 passim
Bender, Col. Louis B.: 163 Bristol, R. I., "The Bristol Plan": 499
Bendix Aviation Company: 81-83, 184, 507 British Air Mission: 81-82
INDEX 593
British communication ships. See Bulolo; Largs. Cable—Continued
British co-operation with the Signal Corps UHF types of: 157, 158
in build-up of U. S. communications in Great Cables and Wireless, Ltd.: 108, 455n
Britain: 105-06, 313 Cairns, Australia: 300
in invasion planning: 338-42, 374 Cairo, Egypt: 310, 311, 312, 395, 430, 452-58
in radar development: 85-102 passim, 262-64 Calcutta, India: 114, 115, 279, 280, 304-05, 408n,
British General Post Office: 106, 223 450, 466
British Guiana: 308, 449 Calidonna, Lt. Col. J. D.: 381
British Independent Signal Battalion, 365th: 363 California: 16
British Isles. See Great Britain. Call signs: 118, 289n, 348, 492. See also Com-
British Navy. See Royal Navy. munication procedure.
British radar sets. See Radar. Cambridge, Mass.: 8 4 , 2 5 7 , 2 7 5 , 3 7 7
British radio sets. See Radio. Cameras. See under Equipment, types and items.
British schools. See under Training; Electronic Cameron, Col. Evan D.: 477
Training Group. Camp Charles Wood, N. J.: 197, 318
British signals. See Royal Corps of Signals. Camp Coles, N. J.: 234,237,524. See also Coles
Brooke, Lt. Col. James F.: 348 Signal Laboratory.
Brooklyn Army Base: 181 Camp Crowder, Mo.: 48, 53-54, 189-97, 317, 319,
Bruneval raid: 85 339, 397, 444
Buchak, Maj. Kirk: 345n, 363 RTC at. See Signal Corps Replacement Train-
Buck, Lt. Jules: 416 ing Centers.
Buckley, Dr. O. E.: 227 school at. See Midwestern Signal Corps School,
Buckner, Brig. Gen. Simon B.: 23, 136 unit training at: 196, 319
Bucy, 2d Lt. Lawrence W.: 488 Camp Davis, N. C.: 70
Budget. See Appropriations. Camp Devens, Mass.: 440
Buffalo, N. Y.: 496 Camp Edison, N. J.: 52,197,318
Bullock, Col. Frank W.: 436 Camp Edwards, Mass.: 439-40
Bulolo: 353, 363, 455n Camp Evans, N. J.: 62n, 63, 238, 262, 275, 294,
Buna, New Guinea: 300, 303, 320, 468 529. See also Signal Corps Radar Laboratory.
Bundy, Harvey H.: 89, 90, 94 Installation and maintenance school at, 1942—43:
Burbank, Calif.: 396 294
Burdick, Capt. Earl A.: 140 Radar (Signal) Laboratory at: 62n
Bureau of Employment Security: 494 Camp Haan, Calif.: 25
Bureau of Fisheries: 124 Camp John Hay, P. I.: 18
Bureau of Indian Affairs: 142 Camp Kohler, Calif.: 196-97, 318, 319
Bureau of Mines: 164 Camp Murphy, Fla.: 54, 189, 197, 211-17, 318,
Bureau of Public Relations. See under War De- 319
partment General Staff. Radar School at: 188n, 212-17
Burgos Point, P. I.: 12, 13 Camp Suffisant, Curasao: 308
Camp Wheeler, Ga.: 26
Burke Electric Company: 170
Campbell, Lt. Col. Alexander H.: 12, 13, 14-15
Burma: 115, 280-81, 463, 464 Canada: 136-42, 288-89, 482-90, 500
Burma Road: 115, 116, 464 Canadian Department of Transport: 139
signals for Stilwell, early 1942: 115-16 Canadian National Telegraphs: 139
Burnap, Col. Arthur E.: 557n, 561-62 Canal Zone. See Panama Canal (Zone).
Bush, Col. George P.: 173 Canol pipeline: 139, 141. See also Alaska Com-
Bush, Dr. Vannevar: 405 munication System.
Bushey, Lt. Col. Orin J.: 25 Canton Island: 109, 288n, 290, 294
Butadiene. See Rubber and rubber substitutes. Cape Esperance, Guadalcanal: 479
Cable: 6, 7, 15, 17, 30, 104. 105, 107, 306, 453, Cape Rodney, Alaska: 145
461, 511 Cape Tanak, Alaska: 145
field cable. See Spiral-four cable, Cape Wislow, Alaska: 130, 145
splicers: 28, 119, 193 Cape York, Australia: 300
submarine: 312,365,446-47 Capra, Maj. Frank: 415, 416
in Alaska: 125, 131, 143,489 Cardwell Manufacturing Company: 170
linking Corregidor and Bataan: 117, 119, Caribbean area: 21-22, 106-07, 282, 283, 306-09,
120 449, 561
264-211 O - 78 - 39
594 THE SIGNAL CORPS
Caribbean Defense Command: 22, 24, 34, 107, China-Burma-India (CBI) Theater: 77, 113-16,
247n, 404 452n, 460-67, 521-22, 524, 541, 565n
Carnegie Institute of Technology: 47n Signal Corps units in, supporting AAF and
Carney, WO John E.: 6n AACS: 279-80, 304
Carrickfergus, Ireland: 104 1942 signal plan for: 303-04
Carrier equipment and systems: 63, 66, 67-68, 104, Chiniak, Alaska: 144, 145
125, 138, 139, 218, 225-29, 234, 522 Chinkaiang, China: 305
A to H project: 340-41, 367-70, 380 Christmas Island: 109, 110, 288n, 290, 294
C carrier: 139, 226-27, 341, 368, 459, 486 Chrysler Corporation: 266n, 270, 274
CF-2 carrier: 370, 371 Chungking, China: 114, 116, 304-05, 466
H carrier: 104, 341 Churchill, Canada: 288, 289
Caruthers, 1st Lt. William H.: 27 Churchill, Winston S.: 412, 416, 445n
Casablanca, Africa: 211, 340-78, 408n, 430, 450, Ciphers and cipher machines: 10, 71, 120, 127, 224,
452, 454 280, 348, 359, 362n, 364, 367, 427, 444, 445,
conference at, January 1943: 412, 454-55 477, 489. See also Codes,
Castle Hill, Iceland: 306 automatic operation, speeding traffic: 219—21,
Cataloging. See under Supply. 237, 447, 476
conference facilities employing: 454
Cavite, P. I.: 12 Civil Aeronautics Administration: 124, 125, 133,
Center Task Force: 340, 353, 354, 357, 361, 375-77 142, 285, 286, 287, 288n, 450
signal center of: 365 Civil Service (Commission) : 26-27, 49, 167, 194,
Central Signal Corps School: 194n 316
Central Signal Corps Training Center: 319. See Civilian Advisory Board: 160
also Camp Crowder; Midwestern Signal Corps Civilian personnel: 16, 42, 294-95, 316
Training Center. in the Alaska Communication System, mid-
Cerrote, P. R.: 307 1942: 146
Chabua, India: 114, 304-05, 450, 451, 466 efforts to provide, early 1942: 38, 49-50
Chabua Tactical Area: 304 malassignment of: 49
Chadwick, Lt. Col. Maurice P.: 6 problems of expansion: 26-27, 28
Chaffee, D. L.: 370 scarcity of civilian technicians: 50
Chain Home and Chain Home Low. See Radar, in Signal depots: 174, 180, 182, 516
British, CH and CHL. strength, December 1941: 26
strength, January 1942: 34
Chakulia, India: 279, 280, 305n, 466
Clark, A. B.: 226
Chancy, Maj. Gen. James E.: 262 Clark, Lt. Gen. Mark W.: 340, 371
Changhi, China: 305 Clark Field, P. I.: 10-11, 13, 14, 15
Cheltenham, England: 312, 339 Clarke, Col. Carter W.: 551, 557n, 562
Chemical Warfare Service: 48, 321n, 513, 523 Cleveland Regional Labor Office: 496
Chennault, Brig. Gen. Claire L.: 304 Clewell, Col. Edgar L.: 51
Chernofski, Alaska: 127-28, 131 Coast Artillery Board: 258
Cheybassi, Iran: 459 Coast Artillery Corps: 38, 44, 62, 95, 117, 127, 128,
Chicago: 155, 221, 289, 324, 429, 509 143
Chicago Regional Labor Office: 496, 497 radar training for: 24, 54, 55, 187, 214-15
Chicago Signal Corps Inspection Zone: 324, 509, radars for: 93, 256-60, 268, 290, 308, 375, 475
516 units
54th Coast Artillery Regiment: 70
Chicago Signal Corps Procurement District: 27,
68th Coast Artillery Regiment: 374, 526
174, 176, 177
Coast Guard: 124
Chicago Signal Depot: 180, 183, 498, 515-16, 519
Code, Maj. Gen. James A.: 44, 60, 173, 286, 295,
Chief of Naval Operations: 157, 551. See also 393n, 558, 561
King, Admiral Ernest J. from Assistant CSigO to Deputy CSigO: 543
Chief Signal Officer: 22, 46, 54, 56, 147, 298, 307, and the November 1942 production drive:
346, 438, 446, 546, 548, 553, 555-56. See 335-36, 337
also Olmstead, Maj. Gen. Dawson. participation in proposed reorganization of Sig-
Chief of Staff: 435, 545, 546, 549, 551n, 556, 561. nal Corps supply and control: 544n, 546, 548,
See also Marshall, General George C. 556
China: 77, 116, 317, 397, 406, 451, 461, 500 proposal to reduce variety of AAF altimeters:
China Air Task Force: 303-04 245-46
INDEX 595
Codes: 71, 345, 427. See also Morse code; Communications. See also Amphibious communi-
Ciphers; Q signals, cations.
need for strong control and security of: 367, air-ground: 13, 373
427, 444, 471, 476 combat: 367-74, 381-86
in the North African campaign: 348, 364 increasing importance in 1942: 380-81
Cold Bay, Alaska: 123, 126, 142, 143, 145, 279 integrated: 234,371,380-81
Cole, Capt. Burton: 139 tactical vs. administrative: 367, 370-71
Coles Signal Laboratory: 162n, 234 Communications control: 540-41, 544-48, 551-52,
developed radio equipment: 62n, 63 554, 555-60, 563-64
and radio relay development: 237, 372 exercised by communications boards: 552, 564
Collins, Maj. Gen. J. Lawton: 481 needing strong central authority: 364, 537,
Collins Radio Company: 77 540-41, 544-60- passim
Collyer Insulated Wire Company: 513 proposal to place control in WDGS: 555-60
Colombia: 169, 501 weakness of, in AAF: 548-50, 564
Colton, Maj. Gen. Roger B.: 58-59, 60, 61-62, Communications security. See Security.
75, 86, 163, 173, 227, 330, 335, 423, 491, 502,Components: 28, 325. See also Spare parts.
531, 549, 556, 557 efforts toward standardization of: 152-53
charged with both R&D and supply: 61, 493, 543 expansion of manufacturing facilities for: 152
efforts to increase production: 322, 329, 333, material breakdowns of: 153-54
336, 514, 528, 533, 542-43 of SCR-584 radar: 267
on radar development and supply: 89, 90, 99, supply situation for, early 1942: 151-52
264, 273, 380 Conference facilities. See under Ciphers and
on radar training: 101, 187 cipher machines.
on radio development and supply: 150, 230, Connecticut Telephone and Electric Company:
371-72 168
an R&D specialist: 61, 541 Connellan, 2d Lt. C. V.: 77
Combat Teams Conrad, Lt. Col. Victor A.: 60, 213, 283, 285, 338
16th: 365, 382 Conservation
26th: 382 of aluminum: 165
Combined Communications Board: 272-73, 345, of crystal quartz: 161-62
443n, 492, 552, 553, 555, 557, 565 of rubber: 156-59
Combined Signal Board: 344 of steatite: 163-64
Commerce, Department of: 170 Consolidated Radio Products Company: 170
Communication companies. See individual com- Constantine, Africa: 341, 368, 372, 382, 454
panies by name. Contracts: 28, 31, 33, 151-68, 172, 334, 496, 503,
Communication industry. See also Facilities 506-09, 530
expansion. basic policies governing: 149-51
attitude toward inspection: 510 cancellation and termination: 508
attitude toward subcontracting: 150, 328, 330 close pricing in: 508, 509
the Big Five: 149-50, 171, 184, 328-29 concentration of, with large firms: 149, 151, 184,
capacity of, December 1941: 30-31
328-29
dependence of the Signal Corps on: 31, 151,
delays in placing: 31, 482, 535
328-30
delinquencies in deliveries under: 31-32, 336,
effect of Selective Service in: 494
growth of productive capacity: 504 527
growth in size and value of, to mid-1942: 184-85
industrial capacity of: 175, 504
number and value of, September 1942: 329
preponderance of youthful workers in: 494
and problems of quality: 504
number and value of, November 1942: 330
wage rates in: 495 placement policies and problems: 173-77, 509
women workers in: 495 renegotiation: 176, 503, 508-09
for spare parts: 325, 527-28
Communication procedure: 127, 131, 198, 284,
and subcontracting policy: 150, 328-31, 507
299, 386, 443, 471, 544n, 554, 558, 565
JANP: 296n, 443n Control. See Communications control.
net procedures: 443 Controlled Materials Plan: 332
in the North African campaign: 344, 345, 348- Controls: 165. See also Limitation orders;
49, 364, 367, 386 Priorities.
Communication ships: 343, 353, 359n, 468. See Cooktown, Australia: 300
also Ancon; Bulolo; Largs. Coral Harbor, Canada: 289n
596 THE SIGNAL CORPS
Cordes, 1st Lt. Harold A.: 135 Defense Plant Corporation: 152, 155, 331, 506
Cordova, Alaska: 124, 126, 142 Defense Supplies Corporation: 160
Cornell University: 47n Del Monte, P. I.: 10, 121, 122
Corozal, P. R.: 307 Delta Service Command: 456, 457
Corps Depots: 28, 33, 174, 178-83, 302, 514-20, 522-23.
I: 468 See also individual depots by name.
II: 351, 353-54, 356, 372, 373, 382-86, 538n ASF study of: 518
IX: 320 expansion of: 178-83, 515-16
XIV: 477 functions of: 173, 179, 518
Corps of Engineers. See Engineers, Corps of. key depot plan: 519
Corput, Col. Rex Van Den: 61, 63, 257, 260, 295 mechanization of: 519-20
comment on SCR-268: 93-94 stock specialization at: 183, 516, 517, 519
rebuttal to SCR-270 criticisms: 94-95, 96 storage space in, mid-1942: 183
Corregidor, P. I.: 12, 13, 17-19, 109, 116-22, 298 storage space in, mid-1943: 515
Counter, Pvt. G. I.: 489 training: 516
Countermeasures. See Radar (and Radio) counter- women workers at: 182
measures. Derax: 85
Couriers. See Messenger service. Desert Training Center, Ariz.: 224, 320, 406
Courses. See under Training. Detzer, Comdr. A. J.: 338
Coyle, Maj. Harold J.: 14, 15n Development. See Research and development.
Craig, Alaska: 124 DeWitt, Lt. Gen. John L.: 23, 124
Craw Field, Africa: 375 Dieppé, France: 398
Crawford, Brig. Gen. David M.: 44, 546, 555, 557, Dinjan, India: 305n, 464n, 466
558 Direction finders. See under Radio.
CRIMSON: 288-90 Distribution: 327,537. See also Office of the Chief
Crosley Radio Corporation: 28, 169, 171, 258, 329 Signal Officer, Distribution Division.
Cruft Laboratory: 57, 209 creation of staff division for: 514
Cryptanalysis: 47n, 204, 445, 447, 563 operation of, to mid-1943: 513-20
Cryptography and cryptographic equipment: 122, overseas complaints of deficiencies in: 520—32
127, 204, 278-79, 319, 346, 444, 470 responsibilities of: 514
Crystals: 160-62, 170, 182 Djidjelli, Africa: 370, 376, 400
control of radio frequencies by: 71, 72, 75, 348 Dobodura, New Guinea: 303
and production techniques: 162 Dolan, Col. William C.: 252, 254-55
shortages of: 160-62, 232-33 Dorud, Iran: 459, 460
Culver City, Calif.: 396 Douglas Aircraft Corporation: 247, 249
Cuny, Col. Clifford D.: 62n Dowman, Col. Charles H.: 548n
Curaçao: 294, 308 Drew Field, Fla.: 16, 25-26, 54-55
Curtiss Aeroplane Corporation: 240 Dryden Rubber Company: 497
Czechoslovakia: 500 Du Pont Company: 157-58
DuBridge, Dr. Lee A.: 260, 309
Daily Mirror, The: 395 Dumas, Lt. Roger E.: 112
Dakar, Africa: 450, 451, 454 Dutch Harbor, Alaska: 123, 126-31, 143
Dakota Field, Aruba: 308
Darlan, Admiral Jean Francois: 371 Eastern Signal Corps School: 206. See also Signal
Darwin, Australia: 18-19, 20, 29, 112, 113, 116, Corps School, Fort Monmonth.
118, 298, 300,467 Eastern Signal Corps Training Center: 319, 320
Davis, Maj. Paul C.: 77 Eastern Task Force: 353, 363, 375
Daw, Lt. Col. William J.: 180 Eastman Kodak Company: 407, 410
Dawson Creek, Canada: 136-37, 482, 483, 484 Eatontown, N. J.: 197
Dayton, Ohio: 63, 180, 281, 496, 509 Eatontown Signal Laboratory: 64, 68, 69
Dayton (Wright Field) Signal Corps Procurement developed wire equipment: 62n, 63
District: 170, 174, 176, 177, 180, 253, 323, and spiral-four developments: 66, 370
324n, 506, 528 Eckles, Sgt. Alfred H.: 14
Dayton Signal Depot: 180, 181, 183, 323, 324n, 515 Ecuador: 279, 290
Meteorological Division of: 324 Edinburgh Field, Trinidad: 308
Western Branch of: 515 Edmiston, Andrew: 165
DeArmond, Col. J. K.: 252, 253, 285 Edmonton, Canada: 137, 139, 141, 142, 145, 482,
Debenham, Lt. W. W.: 262 483, 484
INDEX 597
Edwards, Brig. Gen. Idwal H.: 187n Equipment, types and items. See also SCR- and
Edwards, 1st Lt. John M.: 464 AN/ entries.
Efate: 111,473,475,476 Cameras: 402, 408, 409, 411n
Egypt: 310,311,457,458,459 Miscellaneous items
Egyptian States Telephone and Telegraph K-18: 279
System: 457 M-209: 362n, 476
Eicor, Incorporated: 497, 505 ML-47 and ML-510: 165
Eisenhower, Gen. Dwight D.: 200, 262, 306, 343, PH-330 and PH-530/PF: 411n
345, 346, 358, 398, 399 Power items
regarding radar in North Africa: 272, 377 PE-75: 64, 472
request for radiotelephone in North Africa: PE-94: 239
371-72 PE-95: 76, 184, 472, 526
Eitel-McCullough, Incorporated: 170 PE-99: 453n
El Fasher, Africa: 310 PE-195: 68n
El Yunque, P. R.: 308 Radar items
Elder, Col. Eugene V.: 62n, 94, 230, 274, 543n BC-412: 215
Electronic Training Group: 44, 45, 49, 57, 207, RC-24: 246. See also AN/APN-1
209-12, 247,312, 339 RC-110: 248
abbreviated training in: 56 Radio items
intended to provide radar specialists: 24, 56, 209 BC-191: 279,527
requirements of: 46, 209 BC-270: 103
Elliott, Pvt. George A.: 4 BC-312: 168, 526
BC-329: 308, 310
Ellis, Ray C.: 149, 150
BC-339: 77, 114, 305, 310
Elmendorf Field, Alaska: 142, 279n, 486 BC-340: 77, 103, 305, 310
Emmons, Maj. Gen. Delos G.: 108 BC-342: 526
Enemy Equipment Identification Service: 200 BC-348: 171
Engineers, Corps of: 6, 12n, 48, 53, 77, 107, 141, BC-365: 77,289
189, 510, 523, 541 BC-375: 527
aiding Signal Corps radio installation: 118, 120, BC-400: 310
126, 133, 135,448,474 BC-401: 142, 308
along the Alcan Highway: 137-39, 482-84 BC-410: 308
preparing radar sites: 144 BC-420: 508
18th Engineer Regiment: 137 BC-446: 308, 310
England. See Great Britain. BC-447: 77, 114, 116, 289, 304, 457
Enlisted men BC-460: 77, 308,310
dearth of, with communication skills: 38—39 BC-603 and 604: 72n
limited numbers provided by Affiliated Plan: BC-608: 80
39-40 BC-778: 83
plans for providing, early 1942: 38-43 HS-30: 330, 530
poor assignment of: 43 HS-39: 169
recruiting of, by communications industry: 1-48: 247
42-43 IE-19: 240
shortage of: 26 MN-26: 494
strength, December 1941: 23 RC-27: 168
strength, January 1942: 34 RC-43:. 31
Enlisted Reserve Corps: 41-42, 45, 318 T-30: 31
Equipment TS-189: 247
introduction of new: 370n, 537 Wire items
military characteristics of: 85, 266, 492 BD-9 and 11: 70, 480
nomenclature: 245n, 257n, 263, 265, 274, 515, BD-14: 70
518 BD-57: 169
SCR replaced by AN/ system: 76n BD-71: 69, 70, 355, 459, 480
requirements: 30, 262 BD-72: 69, 70, 304, 459
specifications: 152, 175, 507, 524 BD-74: 17
standardization: 153,154,492. See also Signal BD-80: 68
Corps Standards Agency; American Standards BD-89: 68,70
Association. BD-91: 68
598 THE SIGNAL CORPS
Equipment, types and items—Continued Fajardo, P. R.: 307
Wire items—Continued Falk, Col. Byron A.: 158, 272n
BD-96: 68, 171,365 Fanning Island: 109
BD-97: 171 Fansteel Metallurgical Corporation: 155
BD-100: 64, 454-55, 459 Far East Air Force: 10, 14, 15
CC-358: 66,228 Farmer, Brig. Gen. Archie A.: 44, 174, 182, 516
CE-11: 69, 70 Farnsworth Television and Radio Corporation:
CF-1,2, and 3: 67-68, 226, 227n, 228 329, 334
DR-4and5: 66, 68n, 69 Fedala, Africa: 347, 348, 357, 399
EE-2 and EE-5 : 70 Federal Bureau of Investigation: 512
EE-8: 69, 70, 110, 168, 304, 330, 357, 480, Federal Communications Commission: 22, 298,
501,524 445, 450
EE-97and98: 64,459 Federal Telephone (Telegraph) and Radio Com-
EE-100 and 101: 68n, 226, 227n pany: 77, 304
IN-53: 461 Fell, Maj. Charles F.: 295
LC-61: 370 Felstead, Maj. Charles F.: 133, 136
Q-102: 219, 221 Feriana, Africa: 382
RL-26: 228 Fez, Africa: 346
RL-27: 69 Field Artillery: 44, 184, 232, 233
RL-31: 69,70, 110 radio sets for: 72-73, 348
RL-37: 330 Fiji Islands: 29, 109, 288n, 290, 294, 407, 437,
TC-1, 2, 3, 4, and 12: 64, 68 471, 473, 475, 476, 479
TG-5: 69 Finance Corps: 321n
TG-7: 64 Flat, Alaska: 124
TP-3: 69 Fly, James L.: 149
W-110B: 22, 30, 64, 69, 70. 110, 156, 158- Fogle, 2d Lt. George D.: 93n
59, 184,225,369,505,511,512,513 Fork lifts. See Warehousing, equipment.
W-130: 69, 70, 156-57 Fort Bliss, Tex.: 195
WC-548: 66, 68n Fort Chimo, Labrador: 289
Erie, Pa.: 170 Fort Dawes, Mass.: 258
Eritrea: 310,457,458, 561 Fort Dix, N. J.: 25, 55, 215
Eritrea Service Command: 457 Fort du Blondin, Morocco: 399
Espiritu Santo: 110, 111, 471, 473, 475, 476 Fort Glenn, Alaska: 123, 127, 128-31, 142, 145,
Ethiopia: 456 487
Eubank, Brig. Gen. Eugene L.: 15 Fort Greely, Alaska: 126
Eucalyptus, Algeria: 358, 454 Fort Hancock, N. J.: 62
European Theater of Operations (ETO) : 312, 339, Fort Hunt, Va.: 204
358, 502 Fort Lamy, Africa: 310
Evans, Lt. Col. Paul W.: 62n Fort Lancaster, Tex.: 517
Fort Lawton, Wash.: 25, 125
Everitt, Dr. William L.: 213, 285n
Fort Lewis, Wash.: 137, 140
Fort McPherson, Atlanta: 221
Facilities expansion: 83, 246
Fort Meade, Md.: 289
for aluminum: 164 Fort Mears, Alaska: 127, 129-31
for batteries: 506 Fort Mills, P. L: 18, 109
extent of, to October 1942: 331
Fort Monmouth, N. J.: 40, 444, 524, 529, 531.
for manufacturing components: 152, 331
See also Monmouth Signal Corps Procure-
for mining and processing raw materials: 154 ment District; Signal Corps Laboratories;
for power units: 505-06 Signal Corps School; Training.
for steatite: 162-64 R&D activities at: 62-63, 72, 80, 227, 265
for tantalum: 155 training activities at: 24, 25, 48, 51-53, 186,
for tubes: 31 197-212, 317-22 passim
for wire, cable and wire machinery: 505 Fort Monroe, Va.: 265
Facsimile: 370n, 453 Fort Morrow, Alaska: 123, 135
Fair Employment Practices Commission: 496 Fort Myer, Va.: 224, 431
Fairbanks, Alaska: 124-45 passim, 484, 485, 486 Fort Nelson, Canada: 141, 142
Fairchild Aviation Company: 329 Fort Norman, Canada: 141
Fairfield Air Depot: 180 Fort Omaha, Neb.: 221
INDEX 599
Fort Randall, Alaska: 123, 129, 142 General Electric Company—Continued
Fort Raymond, Alaska: 486 radio production: 184, 327, 508
Fort Read, Trinidad: 308 value of Signal Corps contracts mid-1942: 329
Fort Richardson, Alaska: 143, 486 General Electric X-Ray Corporation: 162
Fort St. John, Canada: 136, 137, 141, 142 General Staff. See War Department General Staff.
Fort Sam Houston, Tex.: 221, 397, 398 Generators. See Equipment, types and items,
Fort Santiago, P. I.: 116 Power.
Fort Shafter, T. H.: 5, 7n, 9, 9n, 16, 18, 20, 77,Geological Survey: 164
109, 112, 121, 222, 296, 297, 430 George, Col. Harold H.: 14, 15n
Fort Sherman, G. Z.: 107 Georgia School of Technology: 47n
Fort Sill, Okla.: 73 German Army communications: 546
Fort Simonds, Jamaica: 107 German photography: 402
Fort Story, Va.: 258 German radar. See under Radar.
Fort William McKinley, P. I.: 11, 116 Getting, I. A.: 379n
Fox Movietone: 415 Gibbs, Maj. Gen. George S.: 558
Frankford Arsenal: 182 Gibraltar: 211, 346-65 passim, 399, 400, 446, 452,
Fredendall, Lt. Gen. Lloyd R.: 382, 561 453
Freedman, Maj. Harry L.: 201n Gibson, William: 117
Freeman, Capt. R. H.: 285 "Gibson Girl" radio. See SCR-578.
French, Col. Edward F.: 9, 223-24, 436,441, 442n Gilfillan Brothers, Incorporated: 168
French North Africa Gillespie, Col. Floyd T.: 104, 545n
communication facilities of: 340, 342 Gillette, Col. Melvin E.: 390
co-operation with: 365 Giraud, Gen. Henri H.: 371
Frequencies: 76, 367 Glasgow, Dr. R. S.: 539
allocation of: 304, 338, 344, 346, 347-48, 449, Globe Radio Company: 18, 19
470, 471, 492, 504, 555n, 558, 565 Globe Wireless Company: 77,429
control of: 79,467, 504, 544n Good, 1st Lt. George W.: 228
diversity: 222-23, 447 Goose Bay, Labrador: 284-85, 288, 289
very high (called ultra high in 1941-42): 45, Governors Island, N. Y.: 106, 219, 221, 288,429
112, 188n, 199, 231, 232, 241, 372, 373, 431, Grable, Col. John C.: 300, 302, 436
432 Granum, Comdr. A. M.: 253
Frequency modulation (FM) : 218, 229-37, 245, Graves, Maj. D. C.: 504
348, 356, 357, 361, 371, 372 Graves, Col. D. D.: 378
incorporated in FM radar altimeter RC-24 (AN/ Gray Manufacturing Company: 184
APN-1): 245 Graybar Electric Company: 139, 329, 482, 514, 544
incorporated in radios SCR-300 and the 500-600 Great Baddow, England: 211
series: 71-73,232 Great Britain: 105, 190, 242, 280, 310, 312-14,
revolutionized short-range radio: 72 338-47 passim, 363, 397-98, 451, 454, 500,
transformed radio relay: 236 546
well received by the Armored Force: 229-31 ACAN facilities in: 106,223,431,453
Frobisher Bay, Canada: 289 and lend-lease: 80, 501, 502
Fruehauf Trailer Company: 270 and radar: 95, 97
Fungus proofing. See under Packing and packag- Signal Corps training (ETG) in: 24, 44, 56-57,
ing. 186, 209-12
Great Falls, Mont.: 142, 145
Gafsa, Africa: 382 Greely, Gen. A. W.: 517
Galapagos Islands: 279, 290, 294 Green, Lt. Col. John C.: 113
Galena, Alaska: 131, 133, 142 Green, Maj. Gen. Joseph A.: 270, 272, 273
Galvin Manufacturing Corporation: 71n, 73, 75, Green, Capt. R. W.: 381
76, 162, 184, 234, 329 Greene, Maj. James A., Jr.: 452
Gander Lake, Newfoundland: 278, 283 Greene, 2d Lt. William C.: 488
Gardner, Col. John H.: 44, 61, 63, 79, 83, 90, 181, Greenland: 24, 34, 284, 288-89, 290, 306, 406
213, 247 Greenwood, L. W.: 332
Gaya, India: 466 Grosvenor Square, London: 312, 313
General Cable Corporation: 66, 329, 505n Ground-controlled interception: 56, 80n. See also
General Electric Company: 31, 43, 149, 157, 169, Radar, GCI.
170,328,334,499,505,527 Guadalcanal: 111, 408n, 470, 473, 475, 476-81,
radar production: 96, 252-74 passim, 379 524
600 THE SIGNAL CORPS
Guam: 20 Hirsh, S. Sgt. Joel M.: 104
Guerlac, Dr. Henry E.: 249 Hitler, Adolph: 88, 445n
Guest, Lt. Col. Wesley T.: 60, 208, 550, 556n, 558,Hobe Sound, Fla.: 54, 212, 213, 216
559 Hoffman, P. R., Company: 162
Gulkana, Alaska: 131, 133, 142 Hollywood, Calif.: 22, 389, 392, 396, 397, 421
Gunther, John: 416 Hong Kong: 18, 21
Gura, Eritrea: 310 Honolulu, T. H.: 4, 6, 9, 9n, 16, 19n, 108, 113,
GYMNAST: 338 116, 117, 222, 296, 298, 300, 467
Honolulu Advertiser: 3
Haifa, Palestine: 459 Hooper, Admiral Stanford C.: 545
Haines, Alaska: 124 Hoppough, Lt. Col. Clay I.: 20, 293
Haleakala, Maui, T. H.: 15 Home, Rear Adm. Frederick J.: 251, 252
Hallicrafters Company: 76, 278 Home Island, Australia: 300
HT-4 radio: 235, 473 Howe, C. D.: 99
RT-4: 473 Howland, J. P.: 332
Hamlin, Maj. William D.: 60 Hubbard Spool Company: 184
Hammarlund Super Pro radio receiver: 76, 224 Huck, J. L.: 332
Hammond, Col. Elton F.: 224, 343, 346, 348-51, Hudson Bay: 288, 289
359, 369, 454 Huebner, Brig. Gen. Clarence R.: 206, 207, 421
Handie-talkie radio: 31, 75, 165, 234, 236. See Hull, Brig. Gen. John A.: 540
also SCR-536. Hunt, G. C., Company: 162
Hand-key: 20n, 222n Huston, Lt. John: 416
Harding, Lt. Comdr. L. M.: 278n Hyde Park, N. Y.: 432
Harris, Col. Lester J.: 324, 509
Harrison, Brig. Gen. William H.: 322, 329, 422, Iba, P. I.: 11, 13-14
423, 425, 543 Iceland: 24, 34, 35, 103-04, 290, 293, 294, 306,
Harvard University: 24, 57, 209 397, 406, 407, 500
Hato Field, Curaçao: 308 Identification. See Radar, IFF; SCR's-515, 532,
Haury, Capt. John G.: 463 533, 535, 595, 695
Hawaii: 3-10 passim, 77, 108-09, 247, 290, 294, India: 77, 113, 114-15,233,279-80,290,294,407,
326, 397, 406, 448, 476, 477. See also Pearl 460-67
Harbor. India Air Task Force: 304, 466
aircraft warning responsibilities in, 1941: 3-4 Industry. See Communication industry.
damage to signal installations, Japanese attack: Infantry: 60,207,234
7-9 radio sets for: 73-76
expansion of communication facilities in: 15—17, Infantry units
296-98 Americal Division: 477,479
Japanese attack on Pearl Harbor: 3—9 1st Division: 351,354,356,381
warning message to, 7 December 1941: 9-10 3d Division: 348, 349, 350
Hawaiian Department: 3, 4, 6, 9, 16, 34, 108, 205, 9th Division: 348, 349
247, 298, 472 14th Philippine Division: 299
Hayden, Col. Gilbert: 80n, 89, 91, 98 25th Division: 6,477,481
Hayes, Lt. Col. Harold G.: 344n 27th Division: 297
Hazeltine Corporation: 73, 334 32d Division: 302,303,468
Heath, Lt. Col. John M.: 50, 62n 34th Division: 56n, 381, 385, 526
Helen Springs, Australia: 300 41st Division: 302,468,470,524
Helena, Mont.: 139 43d Division: 476,479
Henderson Field, Guadalcanal: 477, 479 92d Division: 317
Hengling, China: 305 93d Division: 317
Henn-Collins, Maj. C. A.: 344 18th Infantry Regiment: 354
Henry, Col. William C.: 336n, 436, 484-85 132d Infantry Regiment: 479
Henry Barracks, P. R.: 307 Infrared: 361,405
Ingles, Maj. Gen. Harry C.: 22, 44, 306, 404, 543
Henry T. Allen: 348
and communication control problems: 563—65
Hewitt, Rear Adm. Henry K.: 359 replacing Gen. Olmstead as CSigO, June 1943:
Hewlett-Packard Company: 168 543, 562, 563
Hickam Field, T. H.: 5, 7n, 9, 10, 19n, 109n, 411 seeking radar protection for Panama Canal, early
Hildreth, Col. Raymond C.: 62n, 183, 230 1942: 98-99
INDEX 601
Inness, Maj. W. D.: 240 Japanese—Continued
Inspection: 27, 164, 173, 175, 337, 341. See also in New Guinea: 303
Signal Corps Inspection Agency; Office of the radar: 111
Chief Signal Officer, Inspection Section, in the Russell Islands: 480
early problems and operations of: 176—78 wire and radio: 478n
measures to improve, 1943: 510, 513 Java: 18, 75, 111, 113
multiple inspection: 177 Jenkins, Col. Reuben E.: 206
operations, to mid-1943: 509-12 Jervey, Lt. Col. William W.: 398
peak organization strength: 510 Johnson, Maj. Gen. Davenport: 100
reorganization of: 324 Johnson, Maj. Kenneth D.: 496, 497
training: 27, 175, 509 Joint Army and Navy Munitions Board: 155, 158,
use of women workers in: 509 163, 164, 171-73, 227, 270
and wire fraud cases: 511 — 13 Joint Chiefs of Staff: 271, 338, 445, 550n, 553
Inspector General, The: 195, 421, 422, 423 Joint Communications Board: 272n, 333, 544, 550-
Institute of Radio Engineers: 237 51, 552-53, 555, 557, 560, 565
Inter American Defense Board: 391 Joint communications centers: 349, 470, 473, 481
Intercept (interception of messages): 77, 107, 119, Joint Communications Committee: 550n
345, 348, 386, 430, 445-47, 456, 468, 547, 563. Joint New Weapons Committee: 245
See also Monitoring; Radio intelligence; Sig- Joint Radar Board: 215
nal intelligence. Joint Radio Board: 82, 553
Interception of aircraft. See Ground-controlled Jones, Rear Adm. G. A.: 252, 253
interception. Jones, Capt. R.: 345n
Interdepartmental Telecommunications Commit- Jordan, Maj. Harold R.: 517
tee: 563n Jorhat, India: 280, 305n, 466
Interior, Department of: 169 Joseph, Capt. J. A.: 53
International Aid. See Lend-lease. Juneau, Alaska: 124, 126, 131, 142, 145
International Business Machines Corporation: 204,
221,223,443 Kaaawa, T. H.: 7n
International News Service: 395 Kahuku Point, T. H.: 4
International Telephone and Radio Corporation: Kanakanak, Alaska: 124, 129, 134
263 Kano, Africa: 450
Inter-Service Ionospheric Bureau: 211 Karachi, India: 77, 113-15, 279n, 288n, 303, 304-
Interservice Radio Propagation Laboratory: 492 05, 310-12, 395, 408n, 450, 458, 463, 467
Ionosphere: 432, 447 Karachi Tactical Area: 304
Ionospheric radio propagation: 210-11 Kasserine Pass: 370, 382, 386, 561
Iran: 312,457-60, 500 Kauai, T. H.: 15, 16
Iran-Iraq Service Command. See Persian Gulf Kawailea, T. H.: 7n
Command. Kearny, N. J.
Iranian Posts and Telegraphs: 458 Western Electric plant at: 177, 341, 510
Ireland: 103, 104-06, 306, 313, 397, 398, 406 Western Electric radar school at: 247, 249
Keflavik, Iceland: 104, 306
"J" Service. See Signal Information and Monitor- Kelleher, John J.: 236
ing Service. Keller, Dr. Fred: 198
Kelley, W. A.: 332
Jacksonville, Fla.: 254
Kellogg Switchboard and Supply Company: 330
Jamaica, B. W. I.: 26, 107
Kenney, Maj. Eugene A.: 348
James Parker: 309 Kenny, Maj. Norris G.: 164
Jamming. See Radar (and Radio) Countermeas- Ketchikan, Alaska: 124, 137
ures. Kharagpur, India: 466
Jansky, C. M., Jr.: 285n Khartoum, Africa: 310, 456n
Japanese Khorramshahr, Iran: 458, 459
in the Aleutians: 416,488,489 Kidwell, Lt. Col. Francis E.: 188
army communications: 546 Kimmel, Admiral Husband E.: 9, 10
attack on Burma: 115-16 King, Admiral Ernest J.: 250, 296, 550n, 551
attack on Dutch Harbor: 129-30 King, Col. Henry L. P.: 44, 49, 315-16
attack on Pearl Harbor: 3-9 and AAF requirements for Signal Corps special-
attack on Philippines: 13-15, 18 ists: 41, 321
attack on Wake Island: 20 and the Enlisted Reserve Corps: 41-42
602 THE SIGNAL CORPS
King, Col. Henry L. P.—Continued Lanahan, Col. Francis H.—Continued
recruiting and training problems of: 45, 47, 201, and Signal Corps planning, 1942-43: 60, 338,
207, 208, 322 550, 556, 558
Signal Officer in CBI: 463 Lande, Lt. Robert M.: 104
Kingston, 1st Lt. Clarence R.: 225 Langley Field, Va.: 91, 254-55
Kingston, Jamaica: 107 Lanham, Lt. Col. Charles T.: 421
Kingston Products Corporation: 330 Lapp Insulator Company: 169
Kinjikhoa, India: 305n, 466 Larabee, 1st Lt. T. J.: 456
Kiska, Alaska: 130, 143, 416-17, 487, 488, 489-90 Largs: 353, 356
Klatt, S. Sgt. Lowell V.: 6 Larson, Brig. Gen. Westside T.: 255n
Klise Manufacturing Company: 184 Lashio, Burma: 115
Knight, Eric: 416 Latitude 65 project: 104, 306
Knudsen, Lt. Gen. William S.: 90, 149 Latta, Maj. William B.: 349, 350
Kodiak, Alaska: 124, 125, 126-27, 142, 143 Lattin, Col. Jay D. B.: 50, 186, 200, 208, 549
Kohler, 1st Lt. Frederick L.: 196n Lawailoa, T. H.: 5
Kokee, Kauai, T. H.: 15 Lawrence, Col. James: 196
Koko Head, T. H.: 7n Lawton, Col. Kirke B.: 44, 390n, 393, 421, 423,
Kokomo, Ind.: 330 424
Kolar, E. F.: 240 Lazy Bay, Alaska: 145
Koli Point, Guadalcanal: 476, 477 Leahy, Admiral William D.: 445
Kotzebue, Alaska: 124 Ledo, Burma: 114, 464, 465
Kunming, China: 114, 116, 305, 450, 451, 466, 501 Ledo Road: 464-66
Kweilin, China: 305 Lee, Maj. Gen. John C. H.: 339
Lee, Mass.: 432
La Plata, Md.: 431 Lend-lease: 80, 342, 517
La Senia, Africa: 353, 356 effect of, on supply efforts: 502
Labor: 149-50, 174, 179, 181, 493-500. See modifying signal equipment for: 501—02
also Communication industry; Signal Corps packaging SCR-299's for: 516
Regional Labor Offices by cities of location. post-Pearl Harbor review of: 22-23
problems and Signal Corps assistance: 180, reverse: 461, 465, 502
496-500 Signal Corps participation in, to mid-1943:
shortages of, as a production delay: 493 500-502
special problems of, in electronics industry: value and extent of, mid-1943: 500-502
494-95 Lenzner, Col. Emil: 349
women workers: 182, 316, 495, 509 Leonard Wood: 348
Labor, Department of: 496 Levant Service Command: 457
Labor unions: 497, 498 Lexington, Ky.: 515
Laboratories. See Aircraft Radio Laboratory; Lexington Signal Depot: 16, 22, 108, 179, 181,
Bell Telephone Laboratories; Coles Signal 182-83, 327, 515, 519
Laboratory; Eatontown Signal Laboratory; Liberia: 155,290,500
Radiation Laboratory; Signal Corps General Limitation orders: 150,330,333
Development Laboratories; Signal Corps Linchow, China: 305
Laboratories; Signal Corps Photographic Lingayen Gulf, P. I.: 13, 14
Laboratory; Signal Corps Radar Laboratory; Lingling, China: 305
Squier Laboratory; Training Film Production Link, Fred M. (and Company) : 71, 168, 235,
Laboratory. 237, 332
Labrador: 283, 284 Link Aviation Devices Company: 248
Lack, Fred R.: 227, 253 Lippincott, Maj. Donald K.: 334
Ladd Field, Alaska: 142, 279n, 486 Lithium hydride: 83, 331
Lagos, Liberia: 310 Litvak, Maj. Anatole: 398
Lahore, India: 305n Lockhard, Pvt. Joseph L.: 4, 95
Loewi, Comdr. Mortimer R.: 173
Lamb, Col. Samuel S.: 304, 465 London: 105, 223, 312-13, 339, 340, 346, 398,
Lambert, Maj. Kenneth B.: 407 399, 430, 433, 458
Lanahan, Col. Francis H.: 50, 313n, 368, 481, Loomis, Alfred L.: 89n
557, 558-59 Loran: 277n, 287
comment on Army's need for its own "AT&T Lord, Lt. Elton P.: 398, 399
system": 367, 371 Los Angeles: 429, 496, 515
INDEX 603
Lough, Maj. Frederick C.: 344n Marshall, L. C.: 309
Lovett, Robert A.: 89, 94-95, 250, 251 Martin, Capt. A. B.: 255
Loyalty investigations. See Security, clearances. Maryland: 359n
Lundquist Tool and Manufacturing Company: Massachusetts Institute of Technology: 57, 61, 83,
168-69 210, 275, 309, 553n. See also Radiation Lab-
Lutes, Capt. R.: 70 oratory.
Luzon, P. I.: 10, 12, 18, 20 Matejka, Brig. Gen. Jerry V.: 44, 362n, 370
Lyman, Lt. Col. R. P.: 53 on North African communication matters, 1942-
43: 368, 374, 378, 380, 522, 526
MacArthur, Gen. Douglas: 10, 18, 21, 111, 117, Signal Officer, AFHQ: 343-44,353
119, 120,298 Signal Officer, SPOBS: 339
Machine tools: 149, 164, 168, 253, 271, 273, 330, Materials, critical and strategic. See Conserva-
331,495,505 tion; Shortages; Substitute materials; Con-
Mack, Col. William M.: 253 trolled Materials Plan.
Mackay Radio and Telegraph Company: 18, 19, Materials shortages: 154-65, 331-32, 504, 505
429 in aluminum: 164-65
Mackerel: 91 in crystal quartz: 160-62
Magee, Col. Francis J.: 68, 229, 236n definition of: 154n
Magnetron: 87, 93, 258, 267, 275 as reason for plant expansions: 154, 155, 160,
Maibaum, Capt. Richard W.: 418 162-63
Maiduguri, Liberia: 310 in rubber: 155-56
Maier, Lt. Col. Oscar C.: 63, 68 in steatite: 162-64
Maintenance and repair: 50, 216, 247, 325-26, 516, in tantalum: 155
526, 529, 537. See also Repair shops; Spare Mateur, Africa: 370
parts. Mauborgne, Maj. Gen. Joseph O.: 542
in CBI: 464 Maude, Maj. Raymond C.: 25, 37, 50, 64
echelons of: 179, 187 Maui, T. H.: 15, 16
installation and maintenance schools (radar). Maunabo, P. R.: 307
See under Camp Evans; Kearny, N. J. McClelland, Brig. Gen. Harold M.: 246, 271, 284,
personnel needed for: 42 545,548,551,564
in Southwest Pacific: 302 McCormack, Lt. Col. James: 552
Maktar, Africa: 382 McCrary, Col. Arthur A.: 381, 385, 525, 526
Malama: 29 McDonald, Maj. E.: 538
Malinta Tunnel, Corregidor, P. I.: 116-22 McDonald, E. F.: 233
Mandalay, Burma: 115-16 McDonald, Pvt. Joseph P.: 5
Manhattan District: 440 McGrath, Alaska: 142
Manila, P. I.: 11-12,17-19,29,450 McGraw, Lt. Col. James E.: 258
Manpower: 23ff., 34, 493, 509,536. See also Labor. McNair, Lt. Gen. Lesley J.: 551,553, 560
Mansell, R. B.: 264 McNarney, Lt. Gen. Joseph T.: 557, 560, 564, 565
Marine Corps: 12, 16, 20, 38, 321, 359n, 360n, 475, McRae, Maj. James W.: 248
477, 492, 510, 554 Meade, Brig. Gen. Frank C.: 25, 60, 101, 285, 286,
2d Marine Air Wing: 479 338, 541, 544, 549, 553, 555, 558
use of Signal Corps radars by: 247,291 Mechanical Aptitude Test: 321
Marion, Ind.: 511,512,513 Medical Corps: 465, 540. See also The Surgeon
Marrakech, Africa: 450,451 General.
Marriner, Col. Alfred W.: 79, 91, 130, 285, 288, Mediterranean Base Section: 526
548, 558 Medjez el Bab, Africa: 400
advocate of stronger control over army-wide com- Meigs: 29
munications: 540, 549-50 Melbourne, Australia: 19n, 109, 111, 112, 113, 121,
and the Signal Corps radar program: 91, 101, 296, 298, 299, 300, 302, 397, 467
242, 247, 248, 250-51, 253-54, 291-92 Memphis, Tenn.: 515
Marshall, Gen. George C.: 9, 10, 101, 121, 123, Memphis Signal (General) Depot: 183,515
250, 257, 296, 415, 461, 545, 550n, 558, 560
Mental Hygiene Unit: 201
advocate of training film: 387, 403, 415
ordered number of Signal Corps radios be re- Merauke, New Guinea: 300
duced: 232n, 235, 245, 554 Message (signal) center: 106, 193, 202, 346, 363,
retired the CSigO, Gen. Olmstead: 560, 561, 370, 383, 474. See also under Allied Force
562-63 Headquarters; War Department Message Cen-
warning message to Gen. Short: 9, 10 ter.
604 THE SIGNAL CORPS
Messenger (courier) service: 127, 313n, 320, 356, Motorola: 372. See also Galvin Manufacturing
371, 384, 464, 467, 470 Corporation.
Messer, Sgt. Eustace M.: 19n, 121n Mount Ballyhoo, Unalaska Island: 127-28
Metcalf, Lt. Col. George F.: 82, 252, 268, 274 Mount Isa, Australia: 300
Meteorology: 62n, 63, 283-84, 515 Mountbatten, Vice Adm. Lord Louis: 398
for the AAF: 277, 287, 437 Multiairline: 368, 369, 370
balloons for: 156 Munitions Building: 27, 343, 392, 431
cost of equipment: 330 Munson, Col. E. L.: 415n
equipment stored in Dayton Signal Depot: 180, Murdock, William J., Company: 330
519 Murdock Manufacturing Company: 169
Mexico: 169, 501 Murphy, Lt. Col. William Herbert: 54n
Meyers, Brig. Gen. Bennett E.: 251 Murray, Donald M., Company: 170
Miami: 431, 438, 449 Murray, Capt. Richard: 489
Mica: 253, 499, 530 Murray, 1st Lt. Richard R.: 127-30
Mickey Mouse. See SCR-547 radar. Museum of Modern Art: 415
Microfilm. See V-Mail. Mutual Telephone Company, T. H.: 16, 17
Middle East Theater: 280, 456-60, 524, 541, 556 Myitkyina, Burma: 464, 465
Middletown Air Depot: 183
Midway Island: 130, 291 Naga Hills, Burma: 463, 464
Midwestern Signal Corps School: 194, 196 Naknek, Alaska: 123, 131, 133, 142, 143
Common Subjects Division of: 195 Nandi, Fiji Isles: 475, 476
Midwestern Signal Corps Training Center: 196 Nantucket Island: 275
Military Police: 410, 432 Narsarssuak, Greenland: 284, 285, 288, 289, 408n
Military characteristics. See Equipment. Nasugbu, P. L: 12, 13
Miller, Lt. Col. Fred G.: 226 National Carbon Company: 506
Miller Construction Company: 139, 483, 484 National Defense Research Committee: 83, 215,
Milliken, Brig. Gen. Charles M.: 44, 50, 60, 186, 248, 256, 260, 261, 265, 266, 268n, 274, 309
189, 199, 208, 546, 557 Microwave Committee of: 309
Milne Bay, New Guinea: 300, 302, 303, 320 National Education Association: 194
Minckler, Lt. Col. Rex M.: 445n Navaho Ordnance Storage Depot: 440
Mindanao, P. I.: 10, 18, 116 Naval Air Transport Service: 155
Minks, Capt. Floyd A.: 70 Naval communications: 9, 545n, 547, 551, 553,
Mission. See under Signal Corps. 558n
Mitchel Field, N. Y.: 25, 68 joint communications with the Signal Corps:
Mitchell, Col. Hugh: 44, 61, 213, 216-17, 319 429, 435, 472-73
Molokai, T. H.: 16 proposed merger with Army communications:
Monitoring: 211, 386, 445-46, 537. See also In- 550-52
tercept; Signal Information and Monitoring Naval Research Laboratory: 157
Service. Navigational electronic aids: 11n, 31, 255, 277,
Station Five, Hawaii: 298 281n, 285-86, 288n, 437, 475, 488. See also
Monmouth Signal Corps Procurement District: Altimeter; Loran; Radio compasses, direction
323, 506, 507-08, 529 finding sets, and range.
Montague Island, Alaska: 145 Navy: 19, 20, 38, 126, 278n, 321, 349-50, 391,
Montreal: 430, 483 418, 492, 537, 545, 545n, 547, 553. See also
Moore, Maj. Gen. Richard C.: 59, 149, 272-73 Naval communications.
Moran, Lt. Col. Richard B.: 44 Bureau of Ships: 157, 252, 253, 547
and electronic procurement: 152—53, 172—73,
Morgan, 2d Lt. Robert D.: 497
175, 271-72, 332-33, 510
Morocco: 338, 340, 341, 357, 360, 361 at Pearl Harbor: 5, 7, 9, 10
Morris, 1st Lt. William E.: 487 and radar: 16, 84, 89-90, 99, 245, 247, 250, 251-
Morse code: 20n, 71, 76, 191, 198, 200, 219, 221 54, 255, 260, 263, 274, 291, 475
318, 443 and radio: 78, 81, 106, 117, 124, 304, 305
Morton, Dr. Louis: 14n Neal, Lt. Col. Paul L.: 194
Moses, Brig. Gen. Raymond G.: 560, 564 Negroes: 317, 486n
Mostaganem, Africa: 370 Neilson Field, P. I.: 10, 11, 12, 13-15
Motion Pictures: 388, 390, 396-97, 399-405, 415- Nelson, Donald: 150
18. See also Army Pictorial Service; Photog- Nelson, Lt. Col. Donald H.: 348
raphy; Photographic troops; Training films. Neosho, Mo.: 190
INDEX 605
Netherlands: 500-501 O'Brien, David H.: 514, 543n, 544
Netherlands Indies: 18, 54n, 302 O'Connell, Col. James D.
Netherlands Purchasing Commission: 75 participation in FM radio development: 230-31,
New Caledonia: 109-11, 288n, 290, 294, 397, 437, 232
470, 471, 473, 475 and promotion of radio relay: 236n, 372
New Cumberland, Pa.: 515, 517 report on theater signals, 1943: 538-40
New Cumberland Signal Depot (New Cumberland and Signal Corps research and development: 63,
ASF Depot) : 179, 183, 515, 517 71, 160, 224, 226
New Delhi, India: 114, 116, 280, 304-05, 443, 463, on theater training in use of new equipment:
465, 466, 467 370n
New Guinea: 298-303, 467, 468, 524 Office of the Chief Signal Officer: 21-22, 27, 28,
New Orleans, La.: 429 34, 35, 49, 60, 62, 149, 166, 172, 285, 316, 327,
New Orleans Port of Embarkation: 183 343, 349, 413, 448, 482, 483, 498, 500
New York, N. Y.: 295, 334, 458, 496 reorganizations in: 58-61, 172, 323, 338, 496,
New York Central Railroad: 170 536, 543-44
New York Harbor: 62, 288 units of, December 1941-June 1943
New York Port of Embarkation: 106, 181 Administrative (Branch) Division: 60, 496
New York Regional Labor Office: 496, 500 Aircraft Radar Branch: 328
New York Signal Corps Procurement District: 153, Airways and Airdromes Section: 282n, 283
174 Airways and Fixed Radio Branch: 286
New York Times, The: 395 Army Communications (Branch) (Division)
New York World Telegram, The: 395 Service: 25, 37, 51, 224, 341, 435-36,
New Zealand: 288n, 470, 500 438, 439, 447, 452, 471, 485, 546
Newark, N. J.: 324, 509 Army Pictorial Division. See Army Pictorial
Newfoundland: 34, 277, 278, 290, 294, 397, 406 Service.
Nichols Field, P. I.: 10, 11 Army Security Branch: 444
Niehaus, Maj. John M.: 497 Bid Analysis Section: 507n
Nikolski, Alaska: 145 Civilian Personnel (Branch) Division: 28,
Noble, Dr. Daniel E.: 73 46, 49
Nome, Alaska: 123, 124, 134, 141, 142, 143, 145 Commercial Service Branch: 439
Nomenclature. See under Equipment. Communications Coordination and Equip-
Nordic: 379 ment (Division) (Board) ( B r a n c h )
Norfolk, Va.: 343, 350 Agency: 64n, 160, 492, 546n, 554, 556
Norfolk House, London: 313 Control Division: 328
North Africa (Theater) : 241, 249, 272, 296, 335, Cost Analysis Section: 516
341, 353-86, 450, 451, 521, 538, 539, 541, 547 Directorate of Planning: 60, 295, 338, 343,
deficient AAF communications in: 549 550, 556
invasion of, November 1942: 353ff. Distribution Division: 514, 515, 518, 543n,
plans for invasion of: 338ff. 544
spare parts and repair deficiencies in: 338, 525- Electronics Branch: 62n
26 Engineering and Technical Division: 236
North American Phillips X-Ray Company: 162 Equipment Coordination (Branch) Divi-
sion: 64n, 68, 229, 236n
North Electric Manufacturing Company: 330
Executive Control Division: 50, 546
Northern Alberta Railways Company: 139, 483 Executive Office: 283
Northern Electric Company: 483 Facilities and Materials (Branch) Division:
Northrup Aircraft Corporation: 249 151, 155, 171, 175, 323, 504
Northway, Alaska: 131, 133, 141, 142 Field (Division) Service: 186, 545n
Northwest Airlines: 142, 145 Film Distribution Branch: 413, 414
Northwest Service Command: 139, 142, 485, 486 General Development (Branch) Division:
Norway: 501 63, 224, 236
Noumea, New Caledonia: 109-10, 298, 300, 467, Inspection Section: 27, 178
470, 473-74, 476 Installation and Maintenance Branch: 290
Nulato, Alaska: 124 International Aid Branch: 500
Legal (Branch) Division: 62n, 184, 495-96
Oahu, T. H.: 3, 5, 7, 16, 17, 108 Legal Division Awards Committee: 184
Oakland Army Air Base, Calif.: 179 Maintenance (Branch) Division: 62n, 327
606 THE SIGNAL CORPS
Office of the Chief Signal Officer—Continued Officers: 146, 205-12, 316, 339
units of, December 1941-June 1943—Continued direct commissioning of: 45
Materiel (Branch) Division: 58, 61, 62n, lack of production experts among: 543-44
63, 94, 149, 160, 173, 323, 496, 514, 543n plans for providing, early 1942: 44-48
Military Personnel (Branch) Division: 41, problems of efficient assignment of: 48
49, 315, 321 Regular Army: 44-45
Military Training (Branch) Division: 186, Reserve: 46, 47
200, 549 shortages of: 45, 47, 48, 324, 564
Office of Chief Engineer: 436, 439 Signal Corps preference for ROTC graduates
Official Photo Mail Section: 426 as: 47
Operations Branch: 40, 51, 122 sources of: 44-48
Operations Research Group: 213 special Signal Corps standards for: 45, 47
Photographic Division: 389,390 strength, December 1941: 23
Plant (Branch) Division: 139, 140, 223, 236, strength, January 1942: 34
282, 285, 286, 287, 289, 300, 311, 436-37. supplied by Affiliated Plan: 316-17
See also Plant Engineering Agency. Ogden, Utah: 183, 515
Procurement Division: 27, 62n, 158 Ogden Signal Depot (Utah ASF Depot): 179,
Procurement Planning Section: 148, 151, 183, 515-16
155,175 Ohio State University: 47n
Production Expediting Section: 27, 31, 165, Olfusa River, Iceland: 306
166-73, 227 Olmstead, Maj. Gen. Dawson: 30, 36, 52, 60, 156,
Purchase (Section) Branch: 27, 171, 482, 178, 183, 187, 228n, 230, 232, 235, 245, 294,
509 310, 336, 337, 378, 379, 393, 421, 443, 495-
Quartz Crystal Coordination Section: 160 96, 497, 536
Radar and A i r c r a f t Communications and the Akan Highway Pole Line: 138, 485
Branch: 281 on Army-Navy communications merger: 550,
Radar (Branch) Division: 62, 63, 89, 149, 551, 555, 556-57
244, 248, 250, 252, 268, 282, 283, 285 on AW radars: 98-99, 266, 268-69, 307
Research and Development Division: 58, 61, Caribbean trip: 21-22
82, 158, 323, 325, 545n and efforts to reorganize the Signal Corps: 27,
Scheduling (Branch) Division: 62n, 238, 323 58, 60, 165, 238, 323, 337, 422
Signal Airways Branch: 287 efforts to strengthen Signal Corps control over
Signal Corps Troops Division: 541 Army-wide communications: 544—48, 554,
Signal Intelligence Service: 204, 298, 445n. 558-59
See also Signal Security Agency. and procurement plans and efforts: 33, 149—50,
Signal Operations Service: 338, 546n 151, 164, 332, 335, 337, 541-44
Special Projects Branch: 418 provision of radio communications: 104, 108,
Still Picture Branch: 412 221, 233
Storage and Issue (Branch) (Division) relations with AAF: 68, 219, 235, 240, 245,
Agency: 62n, 76n, 183, 323, 326, 514, 518, 282, 287, 314, 377,393
523. See also Storage and Issue Agency. relations with British: 80, 81, 262
Supply (Division) Service: 58, 60, 61, 148, relations with SOS: 59, 60, 537, 540, 545
149, 322, 323, 329, 336, 411, 493, 514,retirement of: 560-63
515,543,544 and training problems: 189, 196, 208
Supply Operations Branch: 538 trip to England, 1942: 314, 546
Traffic Division: 223, 296,441 trip to Middle and Far East, 1943: 456, 460,
War Plans Division: 76, 236n, 338, 343 539, 541, 556
Office of Production Management: 31, 33, 149, 151, Olsen, Lt. Col. Harry E.: 499
156, 505 Omaha Industries, Incorporated: 330
Office of Scientific Research and Development Onan-Smith Construction Company: 139, 484
(OSRD): 57,58,265,377 Ondal, India: 464, 466
Division 14 of: 84n 89n. See also Radiation Opana, T. H.: 3, 4, 5, 7, 8, 16
Oran, Africa: 340-65, 370, 378, 400, 408n, 450,
Laboratory.
453, 454
Office of Strategic Services: 456 Ordnance Department: 48, 268, 321n, 410, 434,
Office of War Information: 417, 418, 453 465, 510, 523, 526, 527n, 540, 551
Officer Candidate School: 44, 45, 46, 189, 200, Organization and reorganization. See Office of
204, 205-09 the Chief Signal Officer.
INDEX 607
Oro Bay, New Guinea: 300,320 Perida: 488
Osborne, Brig. Gen. F. H.: 415 Perkins, Maj. William M.: 153
Otter Island, Alaska: 145 Persian Gulf Command: 312, 458, 459, 460
Otter Point, Alaska: 123, 126, 127-28, 144 Personnel. See Civilian personnel; Enlisted men;
Officers.
Pacific Telephone and Telegraph Company: 440 Petersburg, Alaska: 124, 131
Packing and packaging: 173 Pettit Barracks, T. H.: 18
creation of staff section for: 523 Philadelphia: 287, 323, 324, 437-38, 448, 509
fungus-proofing: 524 Philadelphia Regional Labor Office: 496, 498
lack of attention to, early 1942: 522-23 Philadelphia Signal Corps Procurement District:
methods and operation, 1943: 523 27, 31, 170, 174-77, 324, 482, 498, 506, 511,
overseas shipping as factor in: 521 516, 528, 535
tropicalization: 517, 524-25, 537 Philadelphia Signal Depot: 22, 174, 179-83, 327,
waterproofing: 349n, 350, 360, 517, 520, 521, 438,498,514,515,516,519
537 Philbsen, Elwood: 488
for Western Task Force: 348, 349n, 350, 356, Philco Corporation: 73, 88, 169, 215, 234, 238,
360, 362n 239, 242, 253, 329
Page, Capt. Esterly C.: 344, 345 Philippeville, Africa: 367, 376-77, 378, 379, 400
Pallets. See Warehousing, equipment. Philippine Commonwealth Telephone Company:
Panama and Panama Canal (Zone) : 10, 22, 107, 18, 19, 117, 119
279, 307,431,446,447 Philippine Department: 17, 34
AWS troops for: 24-25, 28, 34 Philippine Long Distance Telephone Company: 11
radar for: 89, 98-101, 247, 260, 261, 262, 290- Philippines
95, 306, 309, 326 aircraft warning facilities in: 11—13
Signal Corps units for: 106-07, 317, 397, 406 Japanese attack on: 10—15
Pan-American Airlines: 19, 20, 142, 282, 310, 450, last messages from: 120-22
457 signal communications in, first month of war:
Papua Campaign: 300 17-19
Papuan Hotel, Port Moresby, New Guinea: 303 signal communications on Corregidor: 116-22
Paracale, P. I.: 12, 13
Philips, 2d Lt. Robert: 380
Paramount Studio: 390
Photographic Division. See under Office of the
Parker, Maj. Gen. George M.: 120
Chief Signal Officer.
Parker, 1st Lt. Lauris S.: 486
Photographic troops
Parker, Col. Will V.: 235, 282, 285, 286, 287,
300, 436, 448 command problems of: 403-04
distribution of, early 1942: 397, 407, 415
Patents and patent licensing: 176, 333-35
Pathé News: 415, 418 distribution of, mid-1943: 406
in North Africa: 386, 398-400
Patterson, Robert P.: 156, 418, 423. See also
organizational problems of, 1942: 400—403
Under Secretary of War.
training of: 197, 389, 390, 394-96, 426
objection to number of radio types: 245, 246
on Signal Corps lack of authority: 424 Photography. See also Academy of Motion Picture
Patterson Field, Iceland: 104 Arts and Sciences; Army Pictorial Service;
Patterson Field, Ohio: 180 Photographic troops; Signal Corps Photo-
graphic Center; Signal Corps Photographic
Patton, Maj. Gen. George S., Jr.: 320, 340, 348,
Laboratory; Still pictures; Training Film Pro-
358n, 359n, 561
. duction Laboratory; Training films.
Pawtucket, R. I.: 511, 513
Army regulations governing: 387, 536n
Pearl Harbor and the Japanese attack: 5, 9, 10, 13, combat role of: 386, 396, 403
98. See also Hawaii. cost of equipment: 330
impact of, in OCSigO: 21-23 expansion of production facilities for: 390
manpower demands created by: 23-28 organization and facilities for, 1941: 388-90
Opana radar detection of attacking planes: 3-5 prewar attitude toward: 387
production acceleration after: 28-33 security of: 405-06
Peishiyi, India: 305n, 466 supplies and equipment for: 182, 408-11, 494,
Peninsular War Products, Incorporated: 330 519 534
Penrhyn. See Tongareva. uses of, in World War II: 387-88
Pentagon: 249, 323, 407, 412, 453 value of: 388, 415
Signal Corps move into: 392, 431 Photomail. See V-Mail.
608 THE SIGNAL CORPS
Pictorial Engineering and Research Laboratory: Priorities: 11, 29, 332, 333, 425, 482. See also
411 Precedence System.
Pigeons (and pigeoneers) : 39, 40, 317, 319, 320, in allocation of machine tools: 253, 271
382, 478, 517 hampering radar production: 32, 227, 250, 270,
supplies: 182, 519n 272-73, 493
value during radio silence: 382 in message handling: 345
Pine Camp, N. Y.: 230 in production of equipment: 169, 172, 328, 505
Plaines des Gaiacs, New Caledonia: 110-11, 471, Procedure. See Communication procedure.
475 Procurement: 27-33 passim, 42, 171, 176-77, 273,
Plan Position Indicator (PPI) : 57, 80n, 96n, 99, 535. See also Components; Contracts;
256, 258, 266, 502 Depots; Facilities expansion; Inspection; Ma-
Planning: 34, 35, 144, 176 terials; Packing and packaging; Production;
for BOLERO: 338-39 Requirements; Storage and Issue Agency;
for GYMNAST: 338 Supply.
toward procurement: 30, 32, 148, 162, 167, 171, for Alcan pole line: 482
409 decentralization of: 32-33, 507
for South Pacific: 338 of dry batteries: 497-98
for TORCH : 340-52 growth of, to mid-1942: 184-85
Plant Division. See under Office of the Chief Sig- local procurement in Australia: 302
nal Officer. of loran equipment: 278n
Plant Engineering Agency: 287, 437-52, 460, 482 operations and policies, to mid-1943: 503-13
PM: 395 of photographic supplies: 408-11
Point Barrow, Alaska: 124 problems of, late 1942: 322-37
Poland: 500 shift of emphasis in, 1943: 503, 508
Poles and pole lines: 66, 104, 117, 367-68, 457, from small business: 328-31
459, 461, 465, 495, 501, 502. See also An- Procurement districts. See also individual districts
tennas ; Rapid-pole-line, by name.
along the Akan Highway: 138-40, 481-86 decentralization of contracting authority to: 173,
in CBI and along the Ledo Road: 461-63, 465 506-07
Polythene: 157 early contracting problems and techniques: 174—
Port Heiden, Alaska: 123, 126, 135 76
Port Moresby, New Guinea: 20, 112, 298, 300-303, functions and operations of, to mid-1942: 173—76
408n, 467, 468, 474 functions and operations of, to mid-1943: 506-09
Port of Spain, Trinidad: 308 inspection problems and responsibilities of: 173,
Portland, Ore.: 177 176-78
specialization in: 174
Portland Air Base, Ore.: 25 volume of contracting in, to mid-1942: 176
Portland Roads, Australia: 300 Production
Port-Lyautey, Africa: 347, 357, 362, 375 of ASV-10 radar (SCR-517): 250-51, 254
Postal Telegraph and Cable Company: 336n, 429, dependence on communications industry: 31
516 effect of labor shortages on: 493
Postes Telegraphes et Telephones: 356, 365, 455n inadequacy of dollar volume as measure of: 533-
Powell, Col. Carroll A.: 6, 9, 15-17, 205, 288n, 297, 35
298 measures for accelerating: 30—33, 335—37
Power equipment: 281n, 305, 453, 455, 472, 482, relationship of, to tactical decisions: 322
505, 526, 530. See also under Equipment, of SCR-584 radar: 266-74, 533-34
types and items. time required: 322, 520
Precedence Committee: 272, 333 Production Expediting. See also Army-Navy Com-
Precedence System: 332-33 munications Production Expediting Agency;
Presidio of San Francisco: 18, 179 Army-Navy Electronics Production Agency;
Office of the Chief Signal Officer, Production
Presque Isle, Me.: 283, 284, 285, 288, 438
Expediting Section,
Press Radio Company: 19
in accelerating deliveries: 168
Press Wireless Company: 78, 106, 108, 222, 224 by assisting small business: 170-71
429, 455 growth of, to mid-1942: 167-68, 172
Prestwick, Scotland: 262, 283 inauguration of, in the Signal Corps: 165
Pribilof Islands: 123, 134, 135 operation of, to mid-1942: 165-73
Prina, Maj. Frank: 511 problems of recruiting qualified men for: 167
INDEX 609
Production Expediting—Continued Radar—Continued
by raising priority ratings: 169 American sets—Continued
reorganizations of Signal Corps section for: 166, GCI: 93, 97, 260-62
172-73 GL: 93, 265-74
scope of duties in: 167 IFF Mark IV: 215, 242-43, 307, 374, 464
by speeding conversion to war work: 168 LAB: 256
by substituting materials: 169 LW: 263-64, 375
value of: 171-72 MEW: 97n, 274-76
Production Requirements Plan: 332 RR: 85, 93
Propaganda. See Psychological warfare. SLC: 12, 13n, 32, 93, 376
Prosser, Maj. Gen. Walter E.: 190, 194, 196 British sets
Protective Mobilization Plan: 37-38 ACH: 210, 293
Proximity fuze: 265 AI-IV: 86-87, 210, 247, 248, 377
batteries for: 506 ASV-II: 88, 89, 210, 249, 255, 309
Psychological warfare: 346, 349-50, 358, 453 CH: 93, 94, 95, 96, 97-98, 210, 291, 295
Public Roads Administration: 138 CHL: 57, 93, 96, 97, 99-100, 101-02, 215,
Pueblo Nuevo, Panama: 101 291-93
Puerto Rico: 24, 28, 106-08, 290, 294, 326, 397, CHL/GCI: 96, 97-100, 101, 102, 291-93
406, 431, 447 COL: 375, 376
GCI: 80n, 96-97, 101, 210, 293, 307, 346,
Purdue University: 216
375, 376, 502
Purkhiser, Capt. Herman L.: 365 GL: 210, 267
Puu Manawahua, T. H.: 16 IFF Mark II: 85, 242-43
IFF Mark III: 85, 215, 242-43, 263, 268,
Q signals: 345 374
QST: 42 LW: 261-64, 293, 294, 346, 375
Quaker Hosiery Company: 182 MRU: 97, 210, 291n, 293, 375, 376
Quarry Heights, C. Z.: 22, 222, 307 SLC: 210
Quartermaster Corps: 48, 139, 179, 465, 523, 541, TRU: 97, 210, 291n, 293, 295
551 development. See under Research and develop-
Quartz. See Crystals. ment.
German Wuerzburg set: 85
Rabat, Africa: 348, 358, 363 ground: 93-102, 256-76, 375-80
Radar: 32, 62-63, 83-102, 218, 242-76 installation and maintenance: 50, 293-96
airborne: 83-91, 242-56 jamming: 263, 378n. See also Radar (and
aircraft warning ( A W ) : 290-96, 374-80 Radio) Countermeasures.
American sets Japanese: 111
AGL and ARO: 256 navigational: 253, 255. See also Altimeters;
Al (and AI-10): 86-88, 91, 108, 245-49. Loran.
See also SCR's-520 and 720. parts and spares: 324-28, 526-27, 533. See
ASV (and ASV-10) : 86, 88-91, 245, 249- also Spare parts,
56, 258, 276, 309. See also SCR's-517 sets. See SCR's,
and 521. training. See Camp Murphy; Drew Field;
AW sets, location of Electronic Training Group.
in Alaska: 143-45 Radar (and Radio) Countermeasures: 15, 85-86,
in Australia: 111-12 263, 265, 274, 348, 360, 378n, 381, 547, 550,
in the Caribbean: 107, 308-09
559, 565
in CBI: 463
in Hawaii: 3-5, 15-16 Radiation Laboratory: 57, 58, 83, 87-97 passim,
in Java: 111 248-49, 256-75 passim, 309, 377, 553n. See
also Massachusetts Institute of Technology;
in North Africa: 362, 374-80
Office of Scientific Research and Development.
in the Philippines: 11-14
in the South Pacific: 475, 477, 480 Radio: 70-83, 219-24
ETO: 86,90,253,256,276 administrative: 18, 288-89, 430-31, 471. See
CD: 93 also Army Command and Administrative Net-
EW: 32, 93, 376 work,
FM altimeter: 245 airborne sets: 78-83, 237-41
264-211 O - 7 8 - 4 0
610 THE SIGNAL CORPS
Radio—Continued Radio Corporation of America (RCA): 19, 31, 42,
AM sets: 347-48 149, 170, 245, 263, 329, 429. See also Sarnoff,
British sets Col. David.
No. 19: 232, 234, 357 Army use of radio facilities of: 9,18, 118
No. 22: 232 radio altimeter of: 84, 243
No. 33: 347 royalty agreement with: 334-35
No. 48: 73n, 232 Radio intelligence: 386, 445-46, 477, 559. See
TR-1143: 80 also Signal intelligence; Signal Corps units,
compasses: 246, 301 101st-128th and 955th Signal Radio Intel-
development of. See under Research and de- ligence Companies.
velopment, Radio Maroc: 363
direction finding (DF) sets: 62n, 79-80, 287, Radio Position Finding: 62. See also Radar.
298, 307, 386, 450, 477, 487 Radio range. See under Radio.
German set N. S. 2: 81 Radio Recognition: 85. See also Radar, IFF.
ground sets: 71-78, 229-37 Radio relay: 218, 229,319
intercept sets: 298 development of: 234-37
jamming. See Radar (and Radio) counter- first Army installation in N. Africa, 1943 : 372-73
measures. Radiophoto. See Facsimile.
Japanese sets. See under Japanese, Radiotelegraph: 18, 78, 363
link. See Radio relay, Washington-London single sideband circuit: 223
multichannel single sideband: 223n, 224, 452, Radiotelephone: 16, 108, 128
and Army's new portable and vehicular radios:
455, 467
Navy sets
71, 72, 75, 76
conversations between Roosevelt and Churchill:
TBX: 347
445n
TBY: 347, 480
Eisenhower's demand for, promoting radio relay:
net procedure. See Communication procedure, 371
range (navigational aid): 54n, 210, 277n, 281n, realization of value of: 381
284, 285, 288n, 488 Radioteletype: 218,434,447,474
spectrum. See Frequencies. for AACS installations: 289, 449-50
VHP sets: 71, 79-81, 210, 239-41, 285, 307, Algiers ACAN station: 452, 454
373 conference facilities: 454n
500 series for the Armored Force: 70-72, 76, development of: 219-24
230, 232, 348, 356 and radio relay in North Africa, 1943: 372-73
600 series for the FA: 71, 72-73, 232, 348 Radiotype: 221-22,443,454
700 and 800 series: 232-33 disadvantages of: 221, 434
Radio Algiers: 358 first use by the Signal Corps, 1941-42: 221n,
Radio communications 222, 297
RADME and RADNESE: 450
for the AACS
Ramgarh, India: 114, 304, 305, 305n, 466
in Alaska: 141-42 Ramsdall Tool Company: 168
in the Caribbean: 307-08 Rapid-pole-line: 199, 229, 340, 368-69, 370
in North East: 288-89 Rauland Corporation: 171
in South Pacific: 474-75 Raymond Wilmotte Engineering Company: 283
in Alaska: 124-25, 127-29, 133-35, 486-89 Rearden, Lt. Col. James R.: 290, 293, 294
for the Alaska Defense Command: 124-25, 131- Recife, Brazil: 561n
33, 142 Reconstruction Finance Corporation: 158
for Akan: 136-38 Recruiting and recruits: 42, 195, 200
in Burma: 115-16 civilians: 49-50
enlisted men: 38-43
in China and CBI: 116, 304-05, 464
officers: 44-48
on Corregidor: 117-22 Redman, Rear Adm. Joseph R.: 547, 551, 555, 558,
in Iceland: 103-04 559
in India: 114-15, 280 Reeder, Col. William O.: 44, 51
in Middle East: 458-59 Reeves Sound Laboratory: 162
in North Africa: 353-64, 457 Rehm, Wendell L.: 275
in the Philippine Islands: 15, 17-19, 116-22 Reichelderfer, Lt. Col. H.: 79
in the South Pacific: 471, 472-74, 476-77, 488 Renegotiation. See under Contracts.
INDEX 611
Repair. See Maintenance and repair. Royal Air Force ( R A F ) : 56-57, 115,210,211,212,
Repair shops: 126,530 295,344,364,379,450,454
Replacement Training Centers. See Signal Corps Royal Australian Air Force: 109, 111, 112
Replacement Training Centers. Royal Canadian Air Force: 139
Republic: 29 Royal Canadian Corps of Signals: 139
Requirements: 30, 45, 67, 164, 186, 217, 244-45, Royal Corps of Signals: 339, 454, 459
315, 321, 504. See also Production Require- differences from the Signal Corps: 210, 344
ments Plan. Royal Navy: 344, 359, 364, 378, 454, 546
ASP as basis for calculating: 148,521,533-34 Royal Ordnance Corps: 210
as basis for budget estimates: 147-49 Royalty payments (agreement with RCA) : 334-35
peacetime definition of: 30 Royle, John, and Sons, Company: 505
for raw materials: 153-65 passim Rubber and rubber substitutes (synthetics) : 70, 155,
for wire, December 1941: 30 157-59,499
Research Construction Company: 87, 90, 249, 257, Rumbough, Brig. Gen. William S.: 44, 53, 75, 190,
261 312, 339, 398-99
Research and development (R&D) : 58-102, 218- Rumson, N. J.: 62
76, 322, 367. See also Equipment; Labora- Rural Electrification Administration: 139
tories; Radar; Radio; SCR's; Wire, Russell Islands: 476,479
conflict with supply: 58-59, 61, 337, 492-93, Russia. See Union of Soviet Socialist Republics.
530, 541-42 Ryder, Maj. Gen. Charles W.: 385
of radar: 83-102, 242-76
of radio: 70-83, 229-41 Sacramento, Calif.: 196,318,515
shared with civilian and industrial laboratories: Sacramento Signal Depot: 515
58, 78, 265 Sadtler, Col. Otis K.: 40, 41, 44, 446
of wire equipment: 63-70, 218-29 Safi, Africa: 347, 357, 360-61, 399
Research and Development Division. See under St. Croix, Virgin Islands: 307
Office of the Chief Signal Officer. St. George Hotel, Algiers: 363, 454
Research Enterprises Limited: 88-89, 93, 97, 101, St. George Island, Alaska: 123, 135
102,262,263 St. John's, Newfoundland: 278
Reserve Corps. See Enlisted Reserve Corps; Offi- St. Lucia: 308
cers, Reserve; Reserve Officers Training Corps. St. Paul Island, Alaska: 123, 134
Reserve Officers Training Corps (ROTC) : 23, 44, St. Thomas, Virgin Islands: 307, 308
47-48 Sakakida, M. Sgt. Richard K.: 121
Signal Corps ROTC schools, 1941: 47n Salinas, Ecuador: 279
Restorer: 131 Salisbury, Ensign John D.: 111
Reykjavik, Iceland: 103, 104, 285, 408n Saltzman, Col. Charles E.: 50
Rhudy, Capt. J. H.: 498 Saltzman, 2d Lt. Stephen G.: 6
Richey, Lt. Col. Harold L.: 557n Samoa: 111, 288n, 291, 294,475
Ridenour, Dr. Louis N.: 377 San Antonio, Tex.: 183,226,515,517
Rio Hato, Panama: 107, 279 San Antonio Signal (ASF) Depot: 179, 515, 517
Rivers, Capt. William H.: 399 San Bernardino Signal Depot: 515
Riverside, Calif.: 25 San Francisco: 9, 16, 18, 29, 78, 109, 223, 296, 298,
Rives, Col. Tom C.: 44, 61, 63, 230, 327, 543n 300, 429, 430, 433, 448, 473, 509
and the Army Air Forces: 281-83, 284, 539, 564 San Francisco Regional Labor Office: 496, 498
and radar developments: 244, 252, 268, 274, San Francisco Signal Corps Procurement District:
290, 306, 378n 174, 176, 177,324
and VHF radio: 80, 81 San Francisco Signal (General) Depot: 179
Riviera, Fla.: 213,217 San Jose, Costa Rica: 278
Roberts, Col. Frank N.: 558 San Juan, P. R.: 107,259
Roberts, Maj. Ora F.: 139, 482, 483 San Pedro, Calif.: 515
Roberts Field, Liberia: 310 Sandy Hook, N. J.: 62, 93
Robinson, Alfred K.: 133 Sanger, Col. Donald B.: 223
Rochester Machine Screw Company: 169 Santa Ana, P. R.: 308
Rockwell, Lt. Col. Robert B. H.: 477 Sarnoff, Col. David: 245, 336, 542, 544n, 564
Rooks, Lt. Col. W. A.: 50 Savage, 2d Lt. Robert: 498
Roosevelt, Franklin D.: 100, 102, 358, 412, 431, Saville, Col. Gordon P.: 87, 93n, 95, 97-98, 260,
445n, 446 262,271,291,549
612 THE SIGNAL CORPS
Sbeitla, Africa: 382 SCR-271, radar—Continued
Scandrett, 1st Lt. William: 6 in Hawaii: 15-16
Scearce, Chief WO Robert L.: 122 in the Philippines: 11-13
Scheduling: 163, 493 in South and Southwest Pacific: 111, 475
Schlosberg, Col. Richard T.: 390n, 395, 415 spare parts for: 325-27
Schnable, George L.: 178, 324 SCR-274, radio: 31, 78-79, 168, 184, 239, 501
Schofield Barracks, T. H.: 6, 7n SCR-283, radio: 78, 238-39
Schools. See Training. SCR-284, radio: 28, 75, 76n, 169, 170, 171, 232,
Scotland: 262, 277, 283, 398 234, 347, 348, 354, 360, 361, 480, 506, 522,
Scott, Lt. Rey: 416 526, 537
Scott, Brig. W. A.: 344 SCR-287, radio: 184, 501
SCR-177, radio: 165, 235, 347 SCR-288, radio: 31, 75, 526
SCR-183, radio: 78, 238-39 SCR-293 and 294, radio: 71-72, 168, 348
SCR-187, radio: 31, 184 SCR-296, radar: 93, 256-59, 272
SCR-188, radio: 115, 235, 303, 346, 347, 360, 373, SCR-297, navigational aid: 11n
457, 474, 533 SCR-298, radio: 235
SCR-193, radio: 72, 77n, 137, 229, 347, 348, 351, SCR-299, radio: 72, 78, 155, 229, 233, 235, 236,
354, 357, 360, 361, 381, 385, 480 342, 346-47, 348, 371, 457, 472, 473, 474, 516,
SCR's-194 and 195, radio: 31, 73, 75, 234, 480. 526
See also Walkie-talkie radio. excellence as a long-range mobile set: 76, 363,
SCR-197, radio: 11, 19-20, 182, 235, 347, 473, 380, 385
474, 477 proposed radioteletype operation of, 1942: 224
SCR-206, DF: 386, 477 use in air-ground support: 373
SCR-211, frequency meter: 31, 169-70, 171 use in North African campaign: 353, 360, 381-82
SCR-244, radio: 77 SCR-300, radio: 76n, 537. See also Walkie-talkie
SCR-245, radio: 72-73, 165, 229, 233, 480 radio.
SCR-251, navigational aid: 31 development of, utilizing FM circuits: 73, 234
SCR-255, DF: 386 superior in comparative tests with British radio
SCR-264, radio: 239 No. 48: 232
SCR-268, radar: 32, 93, 94, 99, 111-12, 155, 215, SCR-399, radio: 155
242, 256, 257, 263, 264, 265, 268, 272, 290, SCR-505, radio: 76
302, 326, 327, 529, 534n SCR-506, radio: 229
in Canal Zone: 101 SCR-508, radio: 71n, 72, 229, 232, 233, 348
in CBI: 463 SCR-509, radio: 71n, 73, 229, 232, 233, 356, 361,
in Guadalcanal: 477n 506
in Java: 111 SCR-510, radio: 71n, 184, 229, 232, 233, 506
in New Caledonia: 475 SCR-511, radio: 184, 233, 234, 347, 354, 471, 480,
in North Africa: 374, 375, 526 526
spare parts for: 326-27 origin of, as a Cavalry set: 75-76
SCR-269, radio compass: 31, 184 use in North African campaign: 360—61
SCR-270, radar: 32, 54-55, 93-102, 170, 210, 215, SCR-515, IFF radar: 85, 93, 215, 243
242, 256, 257, 262, 263, 264, 290-91, 302, SCR-516, radar: 93, 99, 112, 256, 290, 375, 376,
325-26, 327, 502, 534 463
in Alaska: 143, 144-45, 487 SCR-517, radar: 91, 184, 249-53, 254, 258, 527
in Caribbean areas: 107, 308, 309 SCR-518, radar altimeter: 84, 243-45, 246, 501
in Hawaii: 3, 4, 7n, 16 SCR-520, radar: 87-88, 91, 248, 249, 254, 377
in India: 463 SCR-521, radar: 88-89, 93, 215, 249, 255, 302,
in North Africa: 375-76
309, 375
in Philippine Islands: 11-13
SCR-522, radio: 184, 248, 307, 494
in South and Southwest Pacific: 111-12, 475,
developed from a British prototype: 78, 79-81
477, 480
difficulties in production of: 239-41
spare parts for: 325-27
use in air-ground support: 348, 373
in 1941 Louisiana Maneuvers: 94
a VHF command set for the AAF: 71
SCR-271, radar: 32, 93-102, 210, 235, 256, 261,
262, 264, 290-91, 325-26, 327, 502, 534 SCR-527, radar: 93, 96, 256, 261, 502
in Alaska: 143, 144-45 SCR-528, radio: 71n, 72n, 229, 232, 348
on Ascension Island: 108, 309 SCR-532 and 533, IFF radar: 93, 215, 243
in Caribbean areas: 28, 107, 308, 309 SCR-535, IFF radar: 85, 242-43, 302
INDEX 613
SCR-536, radio: 31, 76, 165, 184, 233, 234, 347, Self ridge Annex, London: 313
522, 526. See also Handie-talkie radio. Selfridge Field, Mich.: 68
origin of, 1941: 75 Selsyn: 273, 493
use in the North African campaign: 361, 381 Semaphore: 382n
SCR-538, radio: 71n, 72n, 229, 232, 348 Services of Supply: 28, 36, 43, 139, 303, 337, 365-
SCR-540, radar: 86-87, 108, 247-48 66, 394, 415, 456, 523, 555-61
SCR-541, radar: 93, 268 became ASF: 491
SCR-545, radar: 93, 266, 267-70, 272-73, 529 CBI Base Section No. 3: 464, 466
SCR-547, radar: 93, 268n, 377, 529 Control Division of: 413, 420, 422, 518, 519,
SCR-556, DF: 310 554-55
SCR's-561, 562, 563, 565, and 566, VHF radio Depot study, 1943: 518-19
facilities: 307, 310 Director of Purchases: 507n
SCR-578, radio: 78, 81-83, 184, 330 in ETO: 312, 339, 342
SCR-582, radar: 93, 226, 257-60, 265, 272, 276, Procurement Branch of: 322
309, 377-79 report on inspection: 513
SCR-584, radar: 93, 276, 377, 529, 533 Signal Corps' place under: 58-60, 70, 186, 323,
an accurate gun layer (GL) : 85, 258 424, 536, 537, 538-40, 545-47, 559
development of: 265-74 in Signal Corps production and supply matters:
SCR-587, radio: 86 254, 268, 325,335,513, 533
SCR-588, radar: 93, 97, 101-02, 107, 215, 256, in Signal Corps training matters: 195, 206, 207,
261, 309, 375-76, 502 214, 217, 319, 321
SCR-595, IFF radar: 85, 243 in Southwest Pacific: 299-302
SCR-598, radar: 257 in spare parts matters: 527-32
SCR-602, radar: 262-64, 375, 379-80, 463, 464n Special Services (Branch) Division of: 392n,
SCR-608, radio: 72-73, 184, 233, 237, 526 413n, 415
SCR-609, radio: 73, 233 took over Signal Corps photography, 1943: 422-
SCR-610, radio: 184, 233, 237, 348, 526 23, 543n
SCR-615, radar: 261-62, 265, 275, 309 Training Division of: 413, 421
SCR-618, radar altimeter: 243-44 Seward, Alaska: 124, 125, 143, 145,486
SCR-625, mine detector: 385 Sharp, Brig. Gen. William F.: 116
SCR-682, radar: 260 Sheetz, Maj. Lawrence C.: 363
SCR-694, radio: 537 Shemya, Alaska: 487, 489
SCR-695, IFF radar: 85, 243 Sherrill, Brig. Gen. Stephen H.: 319
SCR-698, radio: 78n Shipp, Cyrus: 511, 512
SCR-708, radio: 233 Shipping problems: 106, 128, 342, 353, 354, 459-
SCR-718, radar altimeter: 243-45 60, 471-72
SCR-720, radar: 377 Shirer, William L.: 416
SCR-808, radio: 233 Short, Capt. James C.: 500
SCS-2 and 3: 80, 235 Short, Lt. Gen. Walter C.: 4, 10, 17
Sea Girt, N. J.: 52 Shortages: 30, 31-32, 525, 532, 534-35. See also
Seattle: 25, 124-27, 131, 134, 135, 137, 139, 142, Materials shortages.
145, 429, 438 of components: 151-54, 252
Seattle Signal Depot: 515 definitions of strategic and critical: 154n
Secrecy: 111, 270-71, 343, 430,444, 464 of personnel: 194-95, 200, 204
in radar: 62n, 98, 493 of radar: 32
Secret Service: 432 Shuler, Maj. John: 27
Secretary of War: 87, 99, 208, 250, 271, 298, 492, SIAM. See Signal Information and Monitoring
536, 550, 563n. See also Stimson, Henry L. Service.
Security: 204, 298, 340n, 372, 416, 427, 430, 444- Sicily: 368, 370, 537
47 Sidi bou Zid, Africa: 381
clearances: 204-05, 209, 215 Siemens-Halske Company: 155
photographic: 405-06 Signal Airways Service: 287
signal (communications) : 444-47, 544n Signal center. See Message center.
Selective Service: 27, 37, 40, 47, 392n, 394, 494, Signal Corps
497 as an arm: 59, 362, 489, 541, 546
Selfos, Iceland: 306 mission of: 34, 536n, 552
614 THE SIGNAL CORPS
Signal Corps—Continued Signal Corps School, Fort Monmouth—Continued
organization. For field organizations of the Sig- Cryptographic Division: 204
nal Corps, see under their individual names; departments of: 51n
for headquarters, see under Office of the Chief Enlisted Men's Department: 194,199
Signal Officer. Officers' Department: 194, 206
units. See Signal Corps units. Signal Corps Standards Agency: 530
Signal Corps Advisory Council: 336, 542-43 Signal Corps Technical Committee: 66, 82, 226,
Signal Corps Aircraft Signal Service (SCASS) : 245, 492
181, 237-38, 323, 528, 531 Signal Corps units: 7n, 36, 37, 187, 338-39, 345-
Signal Maintenance Section: 181 46, 349n. See also Affiliated Plan.
Signal Corps Board: 64 Regiments
Signal Corps Depots. See Depots. See also indi- 515th Signal Aircraft Warning: 16n
vidual depots by name. 800th Signal Service: 194
Signal Corps Eastern Signal Service: 531 Battalions
Signal Corps General Development Laboratories: 1st Armored Signal: 223, 350, 360
63, 64, 68, 80, 177, 227, 234, 236, 237, 238, 2d Signal Service: 456
323 26th Signal Construction: 104,306
Field Radio Communication Section: 2 27th Signal Construction: 368, 380n
Signal Corps Ground Signal Service: 238, 323, 28th Signal Construction: 368
528, 531 50th Signal: 103, 104
Maintenance Section: 528 51st Signal: 466
Signal Corps Inspection Agency: 323, 324, 503, 52d Signal: 112, 113
509, 528. See also Inspection. 53d Signal: 354, 356, 365, 382, 384
Signal Corps Laboratories: 61-162 and 225-65 54th Signal Construction: 104, 306
passim 60th Signal: 77n, 137
Field Laboratory No. 1: 62n, 73n 62d Signal: 227,228,535
Field Laboratory No. 2: 62n, 70 63d Signal: 358,363,368
Field Laboratory No. 3: 62, 63, 93, 96 95th Signal: 458, 459-60
Signal Corps Photographic Center: 197, 390-425 99th Signal: 40
passim 141st Armored Signal: 350, 380, 382. See
Training Division of: 390 also 141st Armored Signal Company.
Signal Corps Photographic Laboratory: 389, 390, 251st Signal Construction: 368
391, 398, 401, 411,412 435th Signal Construction: 458
Still Picture Library Branch: 412 556th Signal Aircraft Warning: 205
Signal Corps Radar Laboratory: 62n, 63, 96, 98, 558th Signal Aircraft Warning: 107n
99, 177, 215, 291, 295, 323, 325. See also 560th Aircraft Warning: 375
Camp Evans. 561st Aircraft Warning: 375
and the development of LW radar: 262, 379 562d Aircraft Warning: 211
and the development of SCR-584: 267, 274 827th Signal Service: 358
mobile procurement teams from: 327 829th Signal Service: 346-47, 353, 363,
number of projects at, January 1942: 93 380, 382, 384, 455n
placed under the Signal Corps Ground Signal Company D: 372
Service, December 1942: 238 North African Pigeon Platoon: 382
Systems Engineering Section of: 102 835th Signal: 464n, 466. See also 835th
Signal Corps Radar School. See Camp Murphy. Signal Service Company.
Signal Corps Replacement Training Centers 843d Signal Service: 140, 483
at Camp Crowder: 53-54, 189-94, 196, 200, 846th Signal Service Photographic: 411
204, 318 850th Signal Service: 195, 311, 456,457
at Camp Kohler: 196-97, 318-19, 321 928th Signal: 227
at Fort Monmouth: 24, 26, 196-204, 318, 321 Air Support Command Signal: 384
expansion of, 1942: 51-53 Companies
Mental Hygiene Unit: 201 1st Signal Service: 34, 124
Special Training School: 201
2d Signal: 298
Signal Corps School, Fort Monmouth: 51-53, 55,
188n, 190-209 passim, 247, 249, 317, 319 5th Signal: 104n
AW Department: 24, 55, 190, 200 9th Signal Service: 7n, 109, 297, 358, 362
moved from Fort Monmouth to Camp Mur- 17th Signal Service: 109, 443
phy: 318 22d Signal Service: 107
INDEX 615
Signal Corps units—Continued Signal Corps units—Continued
Companies—Continued Companies—Continued
24th Signal: 7n 317th Signal Aircraft Warning: 25
25th Signal: 7n, 477, 480, 481 324th Signal Company Aviation: 7n
26th Signal: 110-11,477,479 325th Signal Company Aviation: 307
37th Signal: 479 327th Signal Company Aviation: 307
43d Signal: 304, 479 328th Signal Company Aviation: 19n
47th Signal: 357 331st Signal Aircraft Warning: 26
60th Signal: 320 402d Signal Service: 280
69th Signal Service: 478 407th Signal Company Aviation: 7n, 19
73d Signal: 106 415th Signal Company Aviation: 303
83d Signal: 304 428th Signal Company Aviation: 7n
92d Signal: 317 436th Signal Construction: 299
93d Signal: 317 440th Signal Construction: 299
101st Signal Company Radio Intelligence: 579th Signal Company: 479-80
298 580th Aircraft Warning: 5
117th Signal Company Radio Intelligence: 672d Aircraft Warning: 475
386n 673d Aircraft Warning: 475
120th Signal Company Radio Intelligence: 674th Aircraft Warning: 475
107 675th Signal Aircraft Warning: 463
121st Signal Company Radio Intelligence: 679th Signal Aircraft Warning: 463
104n 687th Signal Aircraft Warning: 107n
122d Signal Company Radio Intelligence: 688th Signal Aircraft Warning: 107n
352n, 386n 692d Signal Aircraft Warning: 108, 309
123d Signal Company Radio Intelligence: 706th Signal Aircraft Warning: 107n
366n 708th Aircraft Warning: 260
128th Signal Company Radio Intelligence: 809th Signal Service: 110
386 811th Signal Port Service: 187
141st Armored Signal: 357, 365. See also 827th Signal Service: 105, 106
141st Armored Signal Battalion. 830th Signal Service: 310, 311, 451, 454
161st Signal Photographic: 104, 397, 406 832d Signal Service: 302n, 467-68
162d Signal Photographic: 397, 399, 406, 833d Signal Service: 312, 458, 460
478 835th Signal Service: 76n, 77, 114-16, 279-
163d Signal Photographic: 386, 397, 398, 82, 464, 465. See also 835th Signal
406 Battalion.
164th Signal Photographic: 40, 397, 406 838th Signal Service: 141
165th Signal Photographic: 40, 406 841st Signal Service: 289
175th Signal Repair: 480, 526 849th Signal Company Radio Intelligence:
176th Signal Repair: 112n, 302n 386n
177th Signal Repair: 526 860th Signal Radio Intelligence Aviation:
183d Signal Repair: 195 106, 278
196th Signal Photographic: 406 861st Signal Service: 304, 466
201st Signal Depot: 302, 302n 898th Signal Depot: 535
202d Signal Depot: 302 905th Signal Depot Aviation: 475
203d Signal Depot: 104 909th Signal Depot Aviation: 535
209th Signal Depot: 195, 455 955th Signal Radio Intelligence: 466
210th Signal Depot: 535 972d Signal Service: 109
231st Signal Operations: 460
976th Signal Service: 451
233d Signal Operations: 535
235th Signal Operations: 304, 465, 466 977th Signal Service: 451
239th Signal: 352n, 365, 455n 1001st Signal Service: 278
255th Signal Construction: 484, 485 1036th Signal: 464
258th Signal Construction: 486n Signal Aircraft Warning Company Hawaii:
262d Signal Construction: 228 3-4, 6-7, 7n, 15, 16n
275th Signal Construction: 317 Signal Aircraft Warning Company Panama:
281st Signal Service Company Aviation: 465 107n
286th Signal Company Composite: 365 Signal Aircraft Warning Company Philip-
307th Signal Company Aviation: 7n, 25 pines: 11, 12
616 THE SIGNAL CORPS
Signal Corps units—Continued Sondrestromfjord, Greenland: 285, 288n, 289
Platoons Sonotone Corporation: 330
12th Signal Platoon Air Base: 7n Sophie Christiansen: 486
32d Signal Platoon Air Base: 356 Souk Ahras, Africa: 370, 371, 400
36th Signal: 29 Souk el Arba, Africa: 370, 377, 400
45th Signal: 7n South Pacific (Area) : 296, 296n, 448, 468, 470-81,
Miscellaneous 525
1st Radio Broadcasting Detachment: 341 Southampton Island, Canada: 288, 289
1st Signal Photo Mail Company: 407 Southern Pacific Railroad: 170
2d Radio Broadcasting Detachment: 341, Southwest Pacific (Southwest Pacific Area) : 296,
362 298-303, 467, 470, 471, 481
2d Signal Radio Service Section: 346n Spaatz, Maj. Gen. Carl: 246, 284, 314
7th Signal Troop: 357 Spare parts: 130, 254, 290, 308, 324-28, 525-32
803d Fixed Station Radio Detachment: 479 Army policy on: 325, 532
807th Fixed Station Radio Detachment: ASF study of: 528-31
479 contracting policy and methods for: 527
834th Signal Service Photographic Detach- difficulties in calculating requirements for: 324—
ment: 415 25, 531
Signal Information and Monitoring Service: 537n divided responsibility for: 528, 529
Signal intelligence: 366n, 544n, 563. See also early efforts to provide, for radar: 326-27
Cryptanalysis; Intercept; Office of the Chief efforts to improve deliveries of: 527-28
Signal Officer, Signal Intelligence Service; lack of, overseas: 525-27
Radio intelligence. lack of standardization in: 530
Signal Operating Instructions: 345, 348, 349, mobile procurement teams: 327
350, 360 Wallace-Clark reports on: 527-28, 531-32
Signal School. See Signal Corps School. Special Observers' Group: 339
Signal Security Agency: 444, 445, 447. See also Special Services. See under Services of Supply.
Office of the Chief Signal Officer, Signal In- Specialists: 34, 43, 44, 46, 51-52, 57, 536n. See
telligence Service. also Army Specialist Corps; Training, tech-
Signals. See Communications. nical.
Simplex Wire and Cable Company: 157, 184 for ACAN: 38
Sims, Lt. Col. A. M.: 420,421 acquainting field commanders with the cate-
Singapore: 18 gories of: 43
Sitka, Alaska: 124, 126, 134, 143-44, 145 under the Affiliated Plan: 39-40
Skagway, Alaska: 124, 145 for BOLERO: 338-39
Slattery, John J.: 102, 275 lack of production specialists: 543, 544
Slick, Judge Thomas W.: 512 photo specialists: 39, 40
pigeon specialists: 39, 40
Small business: 150, 151, 170, 328-31, 507
radar and AWS specialists: 23-24, 40-41, 43, 50,
number and value of contracts held by: 329,
330-31 54-55, 212, 537. See also Electronic Training
Group.
spreading procurement to: 328-31
radio specialists: 26, 38-43
Small War Plants Corporation: 329, 331
shortages of: 200, 315, 321-22
Smith, Col. Wallace G.: 286, 558 wire specialists: 40
Snow, Col. Conrad E.: 62n, 495-96 Specifications. See under Equipment.
Snow, 1st Lt. Crocker: 283 Sperry Gyroscope Company: 334
Solomon Islands: 110, 111, 298 Spigelglass, Leonard: 416
Somervell, Lt. Gen. Brehon B.: 59-60, 70, 165-66, Spiral-four cable: 234, 271n, 367. See also Equip-
212, 245, 270, 274, 339, 418, 442, 491, 545, ment, wire items, CC-358 and WC-548.
547, 550, 551, 554, 555, 556, 559, 564-65 and carrier equipment: 66, 68, 225-29. See also
and AAF-Signal Corps problems: 282, 294-95, Carrier equipment and systems,
393n, 438, 439 developed by Signal Corps and Bell Telephone
on photographic problems: 392-93, 393n, 404, laboratories: 67
410, 421-25, 543n first use in North African campaign, 1943: 368-
on retiring General Olmstead: 560-63 71
on supply problems: 244, 246, 272-73, 329, origin of: 66
337, 534 Sprague, Capt. A. F.: 14-15
on training problems: 212, 321 Squier Laboratory: 63
INDEX 617
Standard Oil Company: 157, 158 Strength, Signal Corps—Continued
Standard Oil Company of Arabia: 114 inspectors, peak, mid-1943: 510
Standardization. See under Equipment. of Materiel Division, mid-1943: 323
Stark, Admiral Harold L.: 257 on Oahu, 7 December 1941: 7n
State, Department of: 306 officers, enlisted men and civilians in mid-1942:
cable to London: 312 315,316
Steatite: 152, 162-64,495 officers and men in early 1942 : 34, 38, 44, 48, 206,
Steel Engineer: 309 207
Stephenville, Newfoundland: 278 officers and men on 7 December 1941: 23
Stern, Lt. Col. Benjamin: 54 Strobing, Pfc. Irving: 121
Stevenot, Lt. Col. J. E. S.: 119 Strohecker, Lt. G. Mark: 523
Stewart, Capt. J. D.: 341 Stromberg-Carlson Telephone Manufacturing Com-
Stewart-Warner Corporation: 243 pany: 169, 171,517
Still pictures: 388, 390, 392, 396, 411-12, 426 Strong, Maj. Gen. George V.: 435, 540, 545
assistance to corps area laboratories: 412 Stutesman, Col. John H.: 557n
early facilities for making: 389 Styer, Brig. Gen. Wilhelm D.: 422, 550
growth of facilities for, 1942-43: 392,411-12 Subcontracting. See under Contracts.
identification and passport pictures: 392 Subic Bay, P. I.: 13
still picture laboratories. See Signal Corps Pho- Substitute materials. See also Conservation.
tographic Laboratory. need for: 154, 156
still picture library in Washington: 411-12 research in, for rubber: 157-59
training cameramen for: 390, 394-95, 396, 412 research in, for steatite: 163
Stilwell, Lt. Gen. Joseph W.: 115, 196n, 304, 464, Sudan: 456, 457
465, 565 Suez Canal Port Command: 456
Stimson, Henry L.: 254, 389, 555. See also Secre- Sundfelt Equipment Company: 131n
tary of War. Supply. See also Procurement.
accompanied test flight of ASV radar: 91, 249-50 for AACS: 281, 283n
and Canal Zone radar: 99-100, 107, 309 basic Signal Corps headquarters organization and
comment on the Signal Corps and electronics: 59 policies for: 149-73, 323, 336-37
interest in radar: 62, 89n, 90, 255, 260 catalogs and cataloging: 492, 518, 529n
Stock control. See also Storage and Issue Agency. and conflict with technical specialization: 491-93
administrative organizations for handling: 514-15 dominating R&D: 58-62, 530, 541-44
Stock Numbering Agency: 516 field organization for: 173-83, 323-24
Stodter, Col. Charles S.: 403n fiscal year summary of, 1943: 532—35
photographic: 409-10, 534
Stone, Maj. Carrington H.: 27
for radar: 62
Stoner, Brig. Gen. Frank E.: 44, 51, 255, 437, 440, for TORCH: 342,343,344
441, 445, 448, 484 Surgeon General, The: 518, 523. See also Medical
and the AACS: 285, 288, 435 Corps.
and ACAN: 223, 435,447, 452, 453 Suva, Fiji Islands: 109, 407, 408n, 473, 476
on need for strong communication control: 438, Swift, Maj. R. G.: 194
546, 557, 558 Switchboards: 68-70. See also Equipment, types
Storage. See Depots; Storage and Issue Agency. and items, BD's.
Storage and Issue Agency: 514-15, 528 Sydney, Australia: 298, 299, 300, 302, 467, 468, 473
creation of: 323,515 Synthetics. See Rubber.
functions of: 514-15,518,520
operations of, to mid-1943: 514-15 Tables of Basic Allowances: 153, 212, 226, 322,
packaging operations. See Packing and packag- 325,342,459,471,475,520
ing. Tables of Equipment: 322, 492, 521, 534, 548
teletypewriter network of: 434 Tables of Organization: 35-37, 124, 188, 212, 322,
Stratemeyer, Maj. Gen. George E.: 548, 549 401, 548
Strength, Signal Corps Taboga Island, Panama: 261
of Alaska Communication System, early 1942: Tagaytay Ridge, P. I.: 12, 13
124 Tager, Maj. Arthur: 499
civilian, early 1942: 34 Takoradi, Africa: 456n
civilian, peak attained in summer 1942: 316 Tansey, Brig. Gen. Patrick H.: 557, 558
depot personnel, January-May 1943 : 520 Tantalum: 154-55, 273
enlisted men, late 1942: 321 Tape relay: 218-19, 434
618 THE SIGNAL CORPS
Tarawa: 359n, 360n Thompson, Lt. Col. G. L.: 174
Task Force 4: 103 Thrasher, S. Sgt. Waldo V.: 398, 399
Task Force 6814: 110 Tierie, Lt. Col. N. J. C.: 75
Task Force 8012 Composite: 108 Tinsukia, India: 305n, 465, 466
Taylor, Lt. Comdr. W. E. R., USNR: 7n Tizard, Sir Henry: 86, 87
Teague, Col. Theodore T.: 17-19, 117, 118-22 Tocumwal, Australia: 303n
Tébessa, Africa: 367, 376, 382 Toledo, Ohio: 496
Tehran: 458,459,460 Toner, Lt. H. E.: 278n
Tel Litvinsky: 456 Tongareva: 290,495
Telegraph: 67-68, 71, 517. See also Boehme; Tongatabu: 111,290,294,476
Radiotelegraph. Tontouta, New Caledonia: 110, 408n, 475
in Alaska: 125 TORCH: 241, 306-80 passim, 555
in North Africa: 340-41,370 Toronto, Canada: 88, 102
operation revolutionized by the teletypewriter:
Townsend, Col. George L.: 304, 488
63-64
in Philippine Islands: 15
Townsville, Australia: 112, 298-303, 467
Telephone: 67-70. See also Poles and pole lines; Training: 23-26, 51-57, 186-217, 280, 315-22.
Wire. See also Camp Murphy, Radar School; East-
in Army camps: 439-40 ern and Midwestern Signal Corps Schools and
in CBI: 280,465-66,501 Training Centers; Electronic Training Group;
in Great Britain: 313 Officer Candidate School; Signal Corps Re-
for the Hanford atomic energy site: 440 placement Training Centers; Signal Corps
in Hawaii: 6-7, 16-17 School.
in Middle East: 459-60 basic: 190, 211
in New Caledonia: 110 British: 186,210-12,339
in North Africa: 340-41,457,459 courses: 26, 53-55, 187, 188n, 191-214 passim,
in Philippines: 11, 15, 17-18 317,319,444
scramblers: 430, 445 at depots: 182,516
in South Pacific: 475 doctrine and procedure: 198-99
in United States: 430n equipment and aids for: 54, 189, 198, 214, 215,
Telephoto: 312, 453 248
Teletype: 64, 68, 107, 219-24, 427, 442, 514, 516. facilities, growth of, 1942-43: 51-57, 189-217,
See also Carrier equipment and systems; Radio- 318-21
teletype. instructors: 26, 53, 55, 194, 198, 199
in Alaska: 127, 485 literature: 51n, 191, 199, 214
in CBI: 305n, 466 photographic: 389, 390, 394-96, 426
full use dependent on accessory equipment: 64- photomail (V-Mail) : 407
67 Signal Corps control of: 186-87,212
in Middle East: 459-60 strength: 187, 189-94, 196, 205, 207? 209, 217
in New Guinea: 303 in the theaters overseas: 280, 370, 386, 479
in North Africa: 382,384 unit and team training: 319-20
in Philippine Islands: 11, 15, 64, 107 in VHF subjects: 45, 188n, 209, 210, 319
research and development: 218-24 at WAR: 442-43
trend to automatic operation: 219-24 Training, technical
Teletype Corporation: 64n, 169 in advanced electronics in American schools: 57
Teletypewriter Exchange: 434, 442 aircraft warning: 24, 54-55, 318
Teletypewriters: 198, 218-22, 224, 237, 519, 525 effect of troop basis in determining: 36-37
adapted for field use: 64 expansion of, early 1942 : 51-57
in London: 313 inadequacy of troop instruction in: 51-52
No. 15 TTYset: 64n lack of AAF co-operation in: 52, 55
No. 19 TTYset: 222n lack of time to complete: 55-57, 322
Tests. See Army General Classification Test; Me- limitations imposed on, by T/O's: 35-36
chanical Aptitude Test. preinduction training, in Enlisted Reserve Corps:
Texas: 350, 358 41-42, 317-18
The Pas, Canada: 288, 289 problems of securing men qualified for: 40-41,
Theodolites: 502 209 315—18 321
Thomas, Maj. Jesse F.: 349, 350 for radar specialists: 25-26, 209-12, 319-20
Thomas, Col. Samuel H.: 459 shortages of students for radar: 23-26
INDEX 619
Training Film Production Laboratory Union of Soviet Socialist Republics: 141, 458
at Fort Monmouth: 389, 390, 393 complaints regarding W-110-B: 511
at Wright Field: 389, 392-94 recipient of lend-lease: 500-501
Training films: 198, 199, 386, 387-89, 390, 418-25, United Kingdom. See Great Britain.
426 United Shoe Machine Corporation: 266n
for AAF. See Army Pictorial Service. United States Army Forces, Far East (USAFFE) :
appropriations for, 1942—43: 426 10,12,17-19,117
definition of: 418 United States Embassy, London: 105
distribution of: 412-14 United States Employment Service: 496
expansion of production facilities for: 390 United States Forces in the Pacific (USFIP) : 119
facilities for producing, 1941: 388-89 United States Military Academy: 44
historical series: 416-17 United States Military North African Mission: 456
industrial incentive films: 418 United States Office of Education: 42, 57
investigation of program for, 1942-43: 419-24 United States Post Office Department: 407
orientation films: 414—16 United States Rubber Company: 66, 184, 499
procedure for initiating: 429 Units. See under their Arm or Service.
production by commercial studios: 389, 392-93, University of California: 47n
418,419-20 University of Illinois: 47 n
rescoring of, into foreign languages: 391 University of Michigan: 47n
value of: 387-88, 391, 415,416, 426 University of Minnesota: 47n
Transportation Corps: 139, 439n University of Wisconsin: 47n
Treest, Col. Ira H.: 278n Upper Teslin, Canada: 142
TRIGGER: 56 Urhane, Capt. F. F.: 73n
Trinidad: 107, 108, 294, 308, 309, 397, 406, 431,Utah General Depot. See Ogden Signal Depot.
448n, 449 Utskalahammar, Iceland: 306
Trinidad Base Command: 108
Tripoli, Africa: 456,457 Vacuum tubes: 31, 155, 267-68, 273, 501, 525.
Troop basis: 35-37, 148, 166,187,317,521 See also Magnetron; Plan Position Indicator.
for the Army Air Forces: 37, 45 salvage of: 517
deficiencies of: 36-37 VT-118: 240
units authorized for the Aircraft Warning Serv- VT-158: 264
ice: 37 Valdez, Alaska: 124
units authorized Signal Corps by, 1941: 36 Van Deusen, Brig. Gen. George L.: 51, 206, 208,
Tropicalization. See under Packing and packaging. 320
Truman, Harry S.: 419,422, 423,424 Van Horn, Col. James H.: 288
Truscott, Brig. Gen. Lucian K.: 348, 362 Van Ness, 1st Lt. W. L.: 397, 478
Tubes. See Vacuum Tubes. Vance, 1st Lt. Wilbur H.: 250
Tully, Col. Terence J.: 351, 354, 363, 373, 384,Vandewater, M. Sgt. Kenneth A.: 133
526, 538, 539 Vatnesendi, Iceland: 306
Tunis and Tunisia: 340-400 passim, 537 Venezuela: 169, 501
Tutuila: 473 VHF. See under Radio.
Twaddle, Brig. Gen. Harry L.: 55 Vint Hill Farms, Va.: 444, 445. See also Signal
Security Agency.
Twentieth Century-Fox Film Corporation: 418, Vistanex: 157-58
424
Visual signals: 320, 348, 373, 382n
Twentieth General Hospital: 465 V-Mail: 387, 426, 466
Twin Lights, Highlands, N. J.: 62 advantages of: 408
Twitchell, Col. Heath: 484 growth of: 407-08
Tyler, 1st Lt. Kermit A.: 5 Signal Corps responsibilities for: 407
station locations overseas: 408n
U-701: 91n troop units for, 1942-43: 407
Ulmer, A. J.: 169
Umnak Island, Alaska: 123-28, 142, 145, 279n, 416 WAAC. See Women's Army Auxiliary Corps.
Unalaska Island, Alaska: 127, 129-30, 145 Wahiawa, T. H.: 6
Under Secretary of War: 32-33, 81, 149, 164, 167, Waianae, T. H.: 7
173, 175, 207, 244, 496. See also Patterson, Wainegela Mission, New Guinea: 303
Robert P. Wainwright, Lt. Gen. Jonathan M.: 17, 119, 120
620 THE SIGNAL CORPS
Wake Island: 19-20 Watts, Col. Laurence: 183
Walerga Collection Center: 197 Webb, W. L.: 240
Walkie-talkie radio: 73, 75, 232, 234, 480, 502, Weible, Col. Walter L.: 189, 421
524, 537. See also SCR's-194/195 and 300. Weppler, H. E.: 370
Wallace Clark and Company: 27, 149, 165-68, Western Defense Command: 23, 50, 95, 125, 131,
178, 527, 528, 531, 532 278n,488
Waller Field, Trinidad: 219, 308, 449 Western Electric Company: 31, 139, 149, 160,
Walsh, Lt. Col. Robert J.: 498 168, 177, 178, 184, 328, 329, 330, 332, 350,
Walt Disney Studios: 392 368, 507, 510. See also Kearny, N. J.
WAR: 103, 106, 114, 221n, 222, 223, 224, 296, crews assisting in the Alcan pole line project:
297, 307, 312, 429-73 passim. See also War 484, 485
Department Message (Signal) Center. radar production: 86, 87, 247, 257, 267, 274
War Committee on Radio: 153 radio production: 71, 72, 169, 237, 238, 239
War Department General Staff (WDGS): 36, 37, value of Signal Corps contracts, mid-1942: 329
60, 90, 186, 199, 207, 286, 321, 322, 538, 545, wire production: 66, 67-68, 104, 159, 227, 341
546, 554, 555 Western Task Force: 340-77, 398, 399, 555
G-1: 25, 36, 40-41, 43, 47, 195, 206 Western Union Telegraph Company: 9, 106, 312,
G-2: 391, 540, 557, 563 341, 516
G-3: 25, 36, 37, 45, 54, 194 Westinghouse Electric Manufacturing Company:
G-4: 25, 80, 111, 423, 492, 554, 555, 564 31, 43, 149, 169, 268, 327, 328, 334
Military Intelligence Division: 205 and GL radar production: 266, 270, 274, 291
OPD: 454n, 465, 538, 540, 555-57 laboratories: 58
proposed Communications Division: 556-60 value of Signal Corps contracts, mid-1942: 329
Public Relations, Bureau of: 392, 395, 405, 412, Wharton, Maj. Allen E.: 471
413n, 414, 415, 423 Wheeler Field, T. H.: 6, 7n
Signal Corps officers in: 538 White, Maj. Gen. Miller G.: 560
War Plans Division: 36,90 White House signal detachment: 170, 432
War Department Message (Signal) Center: 223, station: 431-32
312, 429, 430-31, 432, 435. See also WAR. Whitehorse, Canada: 137, 141, 142, 484, 485
center of ACAN system: 429-32, 435 Whitney-Blake Company: 184
installation and testing of automatic equipment Whittaker, John: 416
at: 219, 442 Whittier, Alaska: 486
traffic loads, 1942: 441-42 Wideawake Field, Ascension Island: 309
training ACAN operators at: 442-43 Wilcox-Gay Company: 73
and warning messages on Pearl Harbor day: 9, Willard, Col. Robert A.: 53, 190
10 Williams, Col. Grant A.: 353, 356, 357, 381
War Department Photonews Board: 405, 406 on combat losses of communication troops, North
War Labor Board: 496-97,499 Africa: 385-86
War Manpower Commission: 496-97, 499 complaint about spare part and repair deficien-
War Production Board: 139, 150-73 passim, 268, cies: 525
270, 274, 329, 332-33, 410, 440, 441, 483, and FM tank radio: 35n, 71, 229
496-97, 498, 505, 530 Willis, Col. James S.: 200
War Supplies Limited: 252, 329 Wilson, Capt. Henry S.: 19, 20
Ward, Maj. Gen. Orlando: 384 Wimer, Lt. C. J.: 11, 13
Warehousing: 323. See also Depots. Windsor Locks, Conn.: 441
British: 342 Wire: 330, 357, 430, 501, 502, 517. See also Ana-
equipment: 518, 519-20 conda Wire and Cable Company; Carrier
in Southwest Pacific: 302 equipment and systems; Equipment, types and
Warrenton, Va.: 319, 445 items, wire; Telegraph: Telephone,
Waterproofing. See under Packing and packag- in Alaska: 125
ing. along the Alcan Highway: 138-40. See also
Watson, Col. J. T.: 390n Poles and pole lines,
Watson, Maj. Paul E.: 44, 294 in CBI: 279-80,305,466
Watson Lake, Canada: 137,141,484 French facilities: 365, 367, 368, 370
Watson-Watt, Robert A.: 261, 291, 306, 376 in Hawaii: 6-7
inspection of West Coast radar, 1942: 89, 95- in Iceland: 104, 306
97 in the Middle East: 459-60
report on Canal Zone radar: 100-102 in New Caledonia: 110
INDEX 621
Wire—Continued WTJJ: 112, 113,298
in North Africa: 340-41, 364-65, 380, 457-58 WVL: 221,222,307
production problems: 156-59, 499, 505 WVY: 221,296
quantities needed by Armored divisions: 381 training in: 443
research and development: 63-70, 218-19
in South Pacific: 471,475-76,480, 524 X-ray equipment: 162,168
Withers, Lt. Col. William P.: 72, 229-30, 232
Women workers. See Labor. Yakerson, 1st Lt. Robert: 109-10
Women's Army Auxiliary Corps: 316 Yakutat, Alaska: 124, 125, 142, 143
Wood, Lt. Col. Charles Wesley: 197n Yakutat huts: 128, 483
Woody Island, Alaska: 142 Yale University: 61
Woolman, Stanley: 178 "Yank," messenger pigeon: 382
World War I: 34, 39,44, 185, 317, 517, 544 Yeager, Lt. Col. Hobart R.: 63, 527
equipment: 70, 190,492 Yugoslavia: 500
Signal Corps communication control in: 551 Yunnanyi, China: 305
women telephone units in: 316
Wrangell, Alaska: 124 Zahl, Dr. Harold A.: 264
Wright Field, Ohio: 57, 61, 63, 78, 91, 221, 237. Zamboanga, P. I.: 18
See also Aircraft Radio Laboratory; Dayton Zandery Field, Surinam: 308
(Wright Field) Signal Corps Procurement Dis- Zanuck, Col. Darryl F.: 358, 398-401, 403, 406,
trict; Training Film Production Laboratory. 416-17,419,424
WTA: 19n, 109, 12 In Zeigler, Cpl. Earl: 399
WTJ: 109,221,222,296,297 Zenith Radio Corporation: 170, 171, 233, 329, 332