BAHAN
A. BAHAN LOKAL
1 Pasir urug M3 137,500.00 1 RET 500000
2 Pasir Beton M3 137,500.00 1 RET
3 Pasir Pasang M3 137,500.00 1 RET
1,3 ton/m3 = 1300 kg/m3 kg 105.77
4 Batu Gunung / Batu Kali M3 150,000.00 1 RET 600000
5 Koral Beton M3
6 Batu Krikil (sungai) M3 155,000.00 1 RET
7 Batu Pecah :
a. Batu Pecah 1 - 2 cm M3 312,500.00 1 RET 1250000
b. Batu Pecah 2 - 3 cm M3 250,000.00 1 RET 1000000
1,3 ton/m3 = 1300 kg/m3 kg 192.31
c. Batu Pecah 3 - 5 cm M3 250,000.00 1 RET
d. Batu Pecah 5 - 7 cm M3 250,000.00 1 RET
8 Sirtu M3 87,500.00 1 RET
9 Bahan Pilihan M3 112,500.00 1 RET
10 Filler Kg 2,500.00 1 RET
11 Grevel M3 262,500.00 1 RET
12 Bata Merah Bh 1,250.00
13 Tanah Urug M3 65,000.00 1 RET
14 Kayu Kelas I. a. Kayu Besi M3 10,000,000.00
b. Kayu Linggua M3 12,000,000.00
15 Kayu Kelas II :
a. Ky. Cempaka/Meranti (Balok/Papan/Tota M3 5,000,000.00
16 Kayu Kelas III :
a. Kayu Kananga (Papan Mal) M3 2,750,000.00
b. Kayu Nantu (Balok/Papan/Totara) M3 2,750,000.00
17 Bataco Bh 1,550.00
18 Hollobrik bh 3,000.00
19 Bambu (Dolken) Btg/4M 17,000.00
20 Dolken Kayu Btg/4M 56,000.00
21 Tanah Teras M3 137,500.00
22 Air ltr 100.00
23 Ijuk M2 112,500.00
HARGA SATUAN
NO. URAIAN SATUAN
(Rp.)
1 2 3 4
NO URAIAN SATUAN
1 2 3
0
1. Kepala Bidang Cipta Karya
2. Kepala Bidang Bina Marga
3. Kepala Bidang Sumber Daya Air
4. Kepala Bidang Penataan Ruang dan Pertanahan
Mengetahui :
Kepala Dinas Pekerjaan Umum dan Penataan Ruang
ASAR
45,000.00
37,500.00
31,250.00
25,000.00
18,750.00
DAFTAR HARGA SATUAN PEKERJAAN
1 A.2.2.1.1. (K3) Pembuatan 1 m2 Pagar Sementara dari Kayu tinggi 2 meter
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (RP) JUMLAH HARGA (RP)
A TENAGA -
1 Pekerja L.01 OH 0.4000 120,000.00 48,000.00
2 Tukang Kayu L.02 OH 0.4000 160,000.00 64,000.00
3 Kepala Tukang L.03 OH 0.0200 175,000.00 3,500.00
4 Mandor L.04 OH 0.0200 140,000.00 2,800.00
JUMLAH TENAGA KERJA 118,300.00
B BAHAN
1 Dolken kayu dia 8-10; 400 cm Batang 1.2500 56,000.00 70,000.00
2 Semen Portland Kg 5.0000 1,200.00 6,000.00
3 Pasir Beton m3 0.0050 137,500.00 687.50
4 Koral Beton m3 0.0090 155,000.00 1,395.00
5 Kayu 5/7 m3 0.0720 2,750,000.00 198,000.00
6 Paku biasa 2"-5" Kg 0.0600 - -
7 Residu Liter 0.4000 40,000.00 16,000.00
-
-
JUMLAH HARGA ALAT -
2 A.2.2.1.2 (K3) Pembuatan 1 m2 Pagar Sementara dari Seng Gelombang tinggi 2 meter
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (RP) JUMLAH HARGA (RP)
A TENAGA -
1 Pekerja L.01 OH 0.2000 120,000.00 24,000.00
2 Tukang Kayu L.02 OH 0.2000 160,000.00 32,000.00
3 Kepala Tukang L.03 OH 0.0200 175,000.00 3,500.00
4 Mandor L.04 OH 0.0200 140,000.00 2,800.00
JUMLAH TENAGA KERJA 62,300.00
B BAHAN
1 Dolken kayu 8/10; 400 cm Batang 1.2500 56,000.00 70,000.00
2 Semen Portland Kg 2.5000 1,200.00 3,000.00
3 Seng Gelombang Lbr 0.8333 41,000.00 34,166.67
4 Pasir Beton m3 0.0050 137,500.00 687.50
5 Koral Beton m3 0.0090 155,000.00 1,395.00
6 Kayu 5/7 m3 0.0320 2,750,000.00 88,000.00
7 Paku biasa 2"-5" Kg 0.0600 - -
A TENAGA -
1 Pekerja L.01 OH 0.1000 120,000.00 12,000.00
2 Tukang Kayu L.02 OH 0.1000 160,000.00 16,000.00
3 Kepala Tukang L.03 OH 0.0100 175,000.00 1,750.00
4 Mandor L.04 OH 0.0500 140,000.00 7,000.00
JUMLAH TENAGA KERJA 36,750.00
B BAHAN
1 Balok Kayu 5/7 m3 0.0120 2,750,000.00 33,000.00
2 Paku biasa 2"- 3" Kg 0.0200 - -
3 Kayu papan 3/20 m3 0.0070 2,750,000.00 19,250.00
A TENAGA
1 Pekerja L.01 OH 1.0000 120,000.00 120,000.00
2 Tukang Kayu L.02 OH 1.5000 160,000.00 240,000.00
3 Kepala Tukang L.03 OH 0.1500 175,000.00 26,250.00
4 Mandor L.04 OH 0.0500 140,000.00 7,000.00
JUMLAH TENAGA KERJA 393,250.00
B BAHAN
1 Dolken kayu 8/10; 400 cm Batang 3.0000 56,000.00 168,000.00
2 Kayu m3 0.2760 2,750,000.00 759,000.00
3 Paku Biasa Kg 0.7000 - -
4 Seng Gelombang lbr 1.5000 41,000.00 61,500.00
JUMLAH HARGA BAHAN 988,500.00
C PERALATAN -
JUMLAH HARGA ALAT 1,381,750.00
D JUMLAH )A+B+C) 2,763,500.00
E OVERHEAD & PROFIT 10% X D 276,350.00
F HARGA SATUAN PEKERJAAN (D+E) 3,039,850.00
A TENAGA
1 Pekerja L.01 OH 1.0000 120,000.00 120,000.00
2 Tukang Kayu L.02 OH 2.0000 160,000.00 320,000.00
3 Kepala Tukang L.03 OH 0.2000 175,000.00 35,000.00
4 Mandor L.04 OH 0.0500 140,000.00 7,000.00
JUMLAH TENAGA KERJA 482,000.00
B BAHAN
1 Dolken kayu 8/10; 400 cm Batang 1.7000 56,000.00 95,200.00
2 Kayu m3 0.2100 2,750,000.00 577,500.00
3 Paku Biasa Kg 0.3000 - -
4 Semen Portland Kg 10.5000 1,200.00 12,600.00
5 Pasir Beton m3 0.0300 137,500.00 4,125.00
6 Koral Beton m3 0.0500 155,000.00 7,750.00
7 Seng Plat lbr 0.2500 45,000.00 11,250.00
8 Seng Gelombang lbr 1.5000 41,000.00 61,500.00
JUMLAH HARGA BAHAN 769,925.00
C PERALATAN -
JUMLAH HARGA ALAT 1,251,925.00
D JUMLAH )A+B+C) 2,503,850.00
E OVERHEAD & PROFIT 10% X D 250,385.00
F HARGA SATUAN PEKERJAAN (D+E) 2,754,235.00
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (RP) JUMLAH HARGA (RP)
A TENAGA
1 Tukang Kayu L.02 OH 0.3000 160,000.00 48,000.00
2 Kepala Tukang L.03 OH 0.0300 175,000.00 5,250.00
JUMLAH TENAGA KERJA 53,250.00
B BAHAN
1 Papan Kayu Kelas III m3 0.0360 2,750,000.00 99,000.00
2 Paku Biasa Kg 0.0800 - -
3 Balok Kayu 5/7 Kelas III m3 0.0140 2,750,000.00 38,500.00
JUMLAH HARGA BAHAN 137,500.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (RP) JUMLAH HARGA (RP)
A TENAGA
1 Pekerja L.01 OH 13.3340 120,000.00 1,600,080.00
2 Mandor L.04 OH 0.6660 140,000.00 93,240.00
JUMLAH TENAGA KERJA 1,693,320.00
B BAHAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (RP) JUMLAH HARGA (RP)
A TENAGA
1 Pekerja L.01 OH 6.6670 120,000.00 800,040.00
2 Mandor L.04 OH 0.3330 140,000.00 46,620.00
JUMLAH TENAGA KERJA 846,660.00
B BAHAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (RP) JUMLAH HARGA (RP)
A TENAGA
1 Pekerja L.01 OH 0.7500 120,000.00 90,000.00
2 Mandor L.04 OH 0.0250 140,000.00 3,500.00
JUMLAH TENAGA KERJA 93,500.00
B BAHAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (RP) JUMLAH HARGA (RP)
A TENAGA
1 Pekerja L.01 OH 0.9000 120,000.00 108,000.00
2 Mandor L.04 OH 0.0450 140,000.00 6,300.00
JUMLAH TENAGA KERJA 114,300.00
B BAHAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (RP) JUMLAH HARGA (RP)
A TENAGA
1 Pekerja L.01 OH 1.0500 120,000.00 126,000.00
2 Mandor L.04 OH 0.0670 140,000.00 9,380.00
JUMLAH TENAGA KERJA 135,380.00
B BAHAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (RP) JUMLAH HARGA (RP)
A TENAGA
1 Pekerja L.01 OH 1.0000 120,000.00 120,000.00
2 Mandor L.04 OH 0.0320 140,000.00 4,480.00
JUMLAH TENAGA KERJA 124,480.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (RP) JUMLAH HARGA (RP)
A TENAGA
1 Pekerja L.01 OH 1.2000 120,000.00 144,000.00
2 Mandor L.04 OH 0.0450 140,000.00 6,300.00
JUMLAH TENAGA KERJA 150,300.00
B BAHAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (RP) JUMLAH HARGA (RP)
A TENAGA
1 Pekerja L.01 OH 0.0500 120,000.00 6,000.00
2 Mandor L.04 OH 0.0050 140,000.00 700.00
JUMLAH TENAGA KERJA 6,700.00
B BAHAN
A TENAGA
1 Pekerja L.01 OH 0.3300 120,000.00 39,600.00
2 Mandor L.04 OH 0.0100 140,000.00 1,400.00
JUMLAH TENAGA KERJA 41,000.00
B BAHAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (RP) JUMLAH HARGA (RP)
A TENAGA
1 Pekerja L.01 OH 0.5000 120,000.00 60,000.00
2 Mandor L.04 OH 0.0500 140,000.00 7,000.00
JUMLAH TENAGA KERJA 67,000.00
B BAHAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (RP) JUMLAH HARGA (RP)
A TENAGA
1 Pekerja L.01 OH 0.5000 120,000.00 60,000.00
2 Mandor L.04 OH 0.0500 140,000.00 7,000.00
JUMLAH TENAGA KERJA 67,000.00
B BAHAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (RP) JUMLAH HARGA (RP)
A TENAGA
1 Pekerja L.01 OH 0.3000 120,000.00 36,000.00
2 Mandor L.04 OH 0.0100 140,000.00 1,400.00
JUMLAH TENAGA KERJA 37,400.00
B BAHAN
1 Pasir urug m3 1.2000 137,500.00 165,000.00
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (RP) JUMLAH HARGA (RP)
A TENAGA
1 Pekerja L.01 OH 0.1500 120,000.00 18,000.00
2 Mandor L.04 OH 0.0150 140,000.00 2,100.00
JUMLAH TENAGA KERJA 20,100.00
B BAHAN
1 Ijuk m3 1.2000 112,500.00 135,000.00
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (RP) JUMLAH HARGA (RP)
A TENAGA
1 Pekerja L.01 OH 0.2500 120,000.00 30,000.00
2 Mandor L.04 OH 0.0250 140,000.00 3,500.00
JUMLAH TENAGA KERJA 33,500.00
B BAHAN
1 tanah urug m3 1.2000 65,000.00 78,000.00
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (RP) JUMLAH HARGA (RP)
A TENAGA
1 Pekerja L.01 OH 1.5000 120,000.00 180,000.00
2 Tukang Batu L.02 OH 0.7500 150,000.00 112,500.00
3 Kepala Tukang L.03 OH 0.0750 175,000.00 13,125.00
4 Mandor L.04 OH 0.0750 140,000.00 10,500.00
JUMLAH TENAGA KERJA 316,125.00
B BAHAN
1 Batu Belah m3 1.2000 150,000.00 180,000.00
2 Semen Portland kg 202.0000 1,200.00 242,400.00
3 Pasir Pasang m3 0.2850 137,500.00 39,187.50
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (RP) JUMLAH HARGA (RP)
A TENAGA
1 Pekerja L.01 OH 1.5000 120,000.00 180,000.00
2 Tukang Batu L.02 OH 0.7500 150,000.00 112,500.00
3 Kepala Tukang L.03 OH 0.0750 175,000.00 13,125.00
4 Mandor L.04 OH 0.0750 140,000.00 10,500.00
JUMLAH TENAGA KERJA 316,125.00
B BAHAN
1 Batu Belah m3 1.2000 150,000.00 180,000.00
2 Semen Portland kg 163.0000 1,200.00 195,600.00
3 Pasir Pasang m3 0.5200 137,500.00 71,500.00
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (RP) JUMLAH HARGA (RP)
A TENAGA
1 Pekerja L.01 OH 1.5000 120,000.00 180,000.00
2 Tukang Batu L.02 OH 0.7500 150,000.00 112,500.00
3 Kepala Tukang L.03 OH 0.0750 175,000.00 13,125.00
4 Mandor L.04 OH 0.0750 140,000.00 10,500.00
JUMLAH TENAGA KERJA 316,125.00
B BAHAN
1 Batu Belah m3 1.2000 150,000.00 180,000.00
2 Semen Portland kg 136.0000 1,200.00 163,200.00
3 Pasir Pasang m3 0.5440 137,500.00 74,800.00
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (RP) JUMLAH HARGA (RP)
A TENAGA
1 Pekerja L.01 OH 0.7800 120,000.00 93,600.00
2 Tukang Batu L.02 OH 0.3900 150,000.00 58,500.00
3 Kepala Tukang L.03 OH 0.0390 175,000.00 6,825.00
4 Mandor L.04 OH 0.0390 140,000.00 5,460.00
JUMLAH TENAGA KERJA 164,385.00
B BAHAN
1 Batu Belah m3 1.2000 150,000.00 180,000.00
2 Pasir Urug m3 0.4320 137,500.00 59,400.00
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (RP) JUMLAH HARGA (RP)
A TENAGA
1 Pekerja L.01 OH 2.4000 120,000.00 288,000.00
2 Tukang Batu L.02 OH 0.8000 150,000.00 120,000.00
3 Kepala Tukang L.03 OH 0.0800 175,000.00 14,000.00
4 Mandor L.04 OH 0.1190 140,000.00 16,660.00
JUMLAH TENAGA KERJA 438,660.00
B BAHAN
1 Batu Belah m3 0.4500 150,000.00 67,500.00
2 Semen Portland kg 194.0000 1,200.00 232,800.00
3 Pasir Beton m3 0.3120 137,500.00 42,900.00
4 Kerikil m3 0.4680 155,000.00 72,540.00
26 A.4.1.1.4 Membuat 1 m3 Lantai Kerja beton mutu f'c = 7,4 Mpa slump (3-6) cm, w/c = 0,87
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (RP) JUMLAH HARGA (RP)
A TENAGA
1 Pekerja L.01 OH 1.2000 120,000.00 144,000.00
2 Tukang Batu L.02 OH 0.2000 150,000.00 30,000.00
3 Kepala Tukang L.03 OH 0.0200 175,000.00 3,500.00
4 Mandor L.04 OH 0.0600 140,000.00 8,400.00
JUMLAH TENAGA KERJA 185,900.00
B BAHAN
1 Semen Portland kg 230.0000 1,200.00 276,000.00
2 Pasir beton kg 893.0000 105.77 94,451.92
3 Kerikil (max 30 mm) kg 1,027.0000 192.31 197,500.00
4 Air ltr 200.0000 100.00 20,000.00
JUMLAH HARGA BAHAN 587,951.92
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (RP) JUMLAH HARGA (RP)
A TENAGA
1 Pekerja L.01 OH 1.6500 120,000.00 198,000.00
2 Tukang Batu L.02 OH 0.2750 150,000.00 41,250.00
3 Kepala Tukang L.03 OH 0.0280 175,000.00 4,900.00
4 Mandor L.04 OH 0.0830 140,000.00 11,620.00
JUMLAH TENAGA KERJA 255,770.00
B BAHAN
1 Semen Portland kg 247.0000 1,200.00 296,400.00
2 Pasir beton kg 869.0000 105.77 91,913.46
3 Kerikil (max 30 mm) kg 999.0000 192.31 192,115.38
4 Air ltr 215.0000 100.00 21,500.00
JUMLAH HARGA BAHAN 601,928.85
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (RP) JUMLAH HARGA (RP)
A TENAGA
1 Pekerja L.01 OH 1.6500 120,000.00 198,000.00
2 Tukang Batu L.02 OH 0.2750 150,000.00 41,250.00
3 Kepala Tukang L.03 OH 0.0280 175,000.00 4,900.00
4 Mandor L.04 OH 0.0830 140,000.00 11,620.00
JUMLAH TENAGA KERJA 255,770.00
B BAHAN
1 Semen Portland kg 276.0000 1,200.00 331,200.00
2 Pasir beton kg 828.0000 105.77 87,576.92
3 Kerikil (max 30 mm) kg 1,012.0000 192.31 194,615.38
4 Air ltr 215.0000 100.00 21,500.00
JUMLAH HARGA BAHAN 634,892.31
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (RP) JUMLAH HARGA (RP)
A TENAGA
1 Pekerja L.01 OH 1.6500 120,000.00 198,000.00
2 Tukang Batu L.02 OH 0.2750 150,000.00 41,250.00
3 Kepala Tukang L.03 OH 0.0280 175,000.00 4,900.00
4 Mandor L.04 OH 0.0830 140,000.00 11,620.00
JUMLAH TENAGA KERJA 255,770.00
B BAHAN
1 Semen Portland kg 299.0000 1,200.00 358,800.00
2 Pasir beton kg 799.0000 105.77 84,509.62
3 Kerikil (max 30 mm) kg 1,017.0000 192.31 195,576.92
4 Air ltr 215.0000 100.00 21,500.00
JUMLAH HARGA BAHAN 660,386.54
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (RP) JUMLAH HARGA (RP)
A TENAGA
1 Pekerja L.01 OH 1.6500 120,000.00 198,000.00
2 Tukang Batu L.02 OH 0.2750 150,000.00 41,250.00
3 Kepala Tukang L.03 OH 0.0280 175,000.00 4,900.00
4 Mandor L.04 OH 0.0830 140,000.00 11,620.00
JUMLAH TENAGA KERJA 255,770.00
B BAHAN
1 Semen Portland kg 352.0000 1,200.00 422,400.00
2 Pasir beton kg 731.0000 105.77 77,317.31
3 Kerikil (max 30 mm) kg 1,031.0000 192.31 198,269.23
4 Air ltr 215.0000 100.00 21,500.00
JUMLAH HARGA BAHAN 719,486.54
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (RP) JUMLAH HARGA (RP)
A TENAGA
1 Pekerja L.01 OH 1.6500 120,000.00 198,000.00
2 Tukang Batu L.02 OH 0.2750 150,000.00 41,250.00
3 Kepala Tukang L.03 OH 0.0280 175,000.00 4,900.00
4 Mandor L.04 OH 0.0830 140,000.00 11,620.00
JUMLAH TENAGA KERJA 255,770.00
B BAHAN
1 Semen Portland kg 371.0000 1,200.00 445,200.00
2 Pasir beton kg 698.0000 105.77 73,826.92
3 Kerikil (max 30 mm) kg 1,047.0000 192.31 201,346.15
4 Air ltr 215.0000 100.00 21,500.00
JUMLAH HARGA BAHAN 741,873.08
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (RP) JUMLAH HARGA (RP)
A TENAGA
1 Pekerja L.01 OH 1.6500 120,000.00 198,000.00
2 Tukang Batu L.02 OH 0.2750 150,000.00 41,250.00
3 Kepala Tukang L.03 OH 0.0280 175,000.00 4,900.00
4 Mandor L.04 OH 0.0830 140,000.00 11,620.00
JUMLAH TENAGA KERJA 255,770.00
B BAHAN
1 Semen Portland kg 384.0000 1,200.00 460,800.00
2 Pasir beton kg 692.0000 105.77 73,192.31
3 Kerikil (max 30 mm) kg 1,039.0000 192.31 199,807.69
4 Air ltr 215.0000 100.00 21,500.00
JUMLAH HARGA BAHAN 755,300.00
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (RP) JUMLAH HARGA (RP)
A TENAGA
1 Pekerja L.01 OH 1.6500 120,000.00 198,000.00
2 Tukang Batu L.02 OH 0.2750 150,000.00 41,250.00
3 Kepala Tukang L.03 OH 0.0280 175,000.00 4,900.00
4 Mandor L.04 OH 0.0830 140,000.00 11,620.00
JUMLAH TENAGA KERJA 255,770.00
B BAHAN
1 Semen Portland kg 406.0000 1,200.00 487,200.00
2 Pasir beton kg 684.0000 105.77 72,346.15
3 Kerikil (max 30 mm) kg 1,026.0000 192.31 197,307.69
4 Air ltr 215.0000 100.00 21,500.00
JUMLAH HARGA BAHAN 778,353.85
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (RP) JUMLAH HARGA (RP)
A TENAGA
1 Pekerja L.01 OH 0.0700 120,000.00 8,400.00
2 Tukang Besi L.02 OH 0.0700 150,000.00 10,500.00
3 Kepala Tukang L.03 OH 0.0070 175,000.00 1,225.00
4 Mandor L.04 OH 0.0040 140,000.00 560.00
JUMLAH TENAGA KERJA 20,685.00
B BAHAN
1 Besi beton (polos/ulir) kg 10.5000 11,000.00 115,500.00
2 Kawat Beton kg 0.1500 20,000.00 3,000.00
JUMLAH HARGA BAHAN 118,500.00
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (RP) JUMLAH HARGA (RP)
A TENAGA
1 Pekerja L.01 OH 0.5200 120,000.00 62,400.00
2 Tukang Kayu L.02 OH 0.2600 160,000.00 41,600.00
3 Kepala Tukang L.03 OH 0.0260 175,000.00 4,550.00
4 Mandor L.04 OH 0.0260 140,000.00 3,640.00
JUMLAH TENAGA KERJA 112,190.00
B BAHAN
1 Kayu Kelas III m3 0.0400 2,750,000.00 110,000.00
2 Paku 5 - 10 cm kg 0.3000 - -
3 Minyak Bekisting liter 0.1000 40,000.00 4,000.00
JUMLAH HARGA BAHAN 114,000.00
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (RP) JUMLAH HARGA (RP)
A TENAGA
1 Pekerja L.01 OH 0.5200 120,000.00 62,400.00
2 Tukang Kayu L.02 OH 0.2600 160,000.00 41,600.00
3 Kepala Tukang L.03 OH 0.0260 175,000.00 4,550.00
4 Mandor L.04 OH 0.0260 140,000.00 3,640.00
JUMLAH TENAGA KERJA 112,190.00
B BAHAN
1 Kayu Kelas III m3 0.0450 2,750,000.00 123,750.00
2 Paku 5 - 10 cm kg 0.3000 - -
3 Minyak Bekisting liter 0.1000 40,000.00 4,000.00
JUMLAH HARGA BAHAN 127,750.00
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (RP) JUMLAH HARGA (RP)
A TENAGA
1 Pekerja L.01 OH 0.6600 120,000.00 79,200.00
2 Tukang Kayu L.02 OH 0.3300 160,000.00 52,800.00
3 Kepala Tukang L.03 OH 0.0330 175,000.00 5,775.00
4 Mandor L.04 OH 0.0330 140,000.00 4,620.00
JUMLAH TENAGA KERJA 142,395.00
B BAHAN
1 Kayu Kelas III m3 0.0200 2,750,000.00 55,000.00
2 Paku 5 - 10 cm kg 0.4000 - -
3 Minyak Bekisting liter 0.2000 40,000.00 8,000.00
4 Balok Kayu Kelas III m3 0.0150 2,750,000.00 41,250.00
5 Plywood tebal 9 mm lembar 0.3500 115,000.00 40,250.00
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (RP) JUMLAH HARGA (RP)
A TENAGA
1 Pekerja L.01 OH 0.6600 120,000.00 79,200.00
2 Tukang Kayu L.02 OH 0.3300 160,000.00 52,800.00
3 Kepala Tukang L.03 OH 0.0330 175,000.00 5,775.00
4 Mandor L.04 OH 0.0330 140,000.00 4,620.00
JUMLAH TENAGA KERJA 142,395.00
B BAHAN
1 Kayu Kelas III m3 0.0200 2,750,000.00 55,000.00
2 Paku 5 - 10 cm kg 0.4000 - -
3 Minyak Bekisting liter 0.2000 40,000.00 8,000.00
4 Balok Kayu Kelas III m3 0.0180 2,750,000.00 49,500.00
5 Plywood tebal 9 mm lembar 0.3500 115,000.00 40,250.00
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (RP) JUMLAH HARGA (RP)
A TENAGA
1 Pekerja L.01 OH 0.6600 120,000.00 79,200.00
2 Tukang Kayu L.02 OH 0.3300 160,000.00 52,800.00
3 Kepala Tukang L.03 OH 0.0330 175,000.00 5,775.00
4 Mandor L.04 OH 0.0330 140,000.00 4,620.00
JUMLAH TENAGA KERJA 142,395.00
B BAHAN
1 Kayu Kelas III m3 0.0250 2,750,000.00 68,750.00
2 Paku 5 - 10 cm kg 0.4000 15,000.00 6,000.00
3 Minyak Bekisting liter 0.2000 40,000.00 8,000.00
4 Balok Kayu Kelas III m3 0.0150 2,750,000.00 41,250.00
5 Plywood tebal 9 mm lembar 0.3000 115,000.00 34,500.00
6 Dolken kayu dia. 8-10 cm - pjng 4 m batang 4.0000 17,000.00 68,000.00
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (RP) JUMLAH HARGA (RP)
A TENAGA
1 Pekerja L.01 OH 0.6600 120,000.00 79,200.00
2 Tukang Kayu L.02 OH 0.3300 160,000.00 52,800.00
3 Kepala Tukang L.03 OH 0.0330 175,000.00 5,775.00
4 Mandor L.04 OH 0.0330 140,000.00 4,620.00
JUMLAH TENAGA KERJA 142,395.00
B BAHAN
1 Kayu Kelas III m3 0.0300 2,750,000.00 82,500.00
2 Paku 5 - 12 cm kg 0.4000 15,000.00 6,000.00
3 Minyak Bekisting liter 0.2000 40,000.00 8,000.00
4 Balok Kayu Kelas III m3 0.0200 2,750,000.00 55,000.00
5 Plywood tebal 9 mm lembar 0.3500 115,000.00 40,250.00
6 Dolken kayu dia. 8-10 cm - pjng 4 m batang 3.0000 17,000.00 51,000.00
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (RP) JUMLAH HARGA (RP)
A TENAGA
1 Pekerja L.01 OH 0.6600 120,000.00 79,200.00
2 Tukang Kayu L.02 OH 0.3300 160,000.00 52,800.00
3 Kepala Tukang L.03 OH 0.0330 175,000.00 5,775.00
4 Mandor L.04 OH 0.0330 140,000.00 4,620.00
JUMLAH TENAGA KERJA 142,395.00
B BAHAN
1 Kayu Kelas III m3 0.0300 2,750,000.00 82,500.00
2 Paku 5 - 12 cm kg 0.4000 15,000.00 6,000.00
3 Minyak Bekisting liter 0.1500 40,000.00 6,000.00
4 Balok Kayu Kelas III m3 0.0150 2,750,000.00 41,250.00
5 Plywood tebal 9 mm lembar 0.3500 115,000.00 40,250.00
6 Dolken kayu dia. 8-10 cm - pjng 4 m batang 2.0000 17,000.00 34,000.00
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (RP) JUMLAH HARGA (RP)
A TENAGA
1 Pekerja L.01 OH 0.1800 120,000.00 21,600.00
2 Tukang Batu L.02 OH 0.0200 150,000.00 3,000.00
3 Tukang Kayu L.02 OH 0.0200 160,000.00 3,200.00
4 Tukang Besi L.02 OH 0.0200 150,000.00 3,000.00
5 Kepala Tukang L.03 OH 0.0060 175,000.00 1,050.00
6 Mandor L.04 OH 0.0090 140,000.00 1,260.00
JUMLAH TENAGA KERJA 33,110.00
B BAHAN
1 Kayu Kelas III m3 0.0020 2,750,000.00 5,500.00
2 Paku 5 - 12 cm kg 0.0100 15,000.00 150.00
3 Minyak Bekisting liter - 40,000.00 -
4 Besi beton polos kg 3.0000 11,000.00 33,000.00
5 Kawat beton kg 0.4500 20,000.00 9,000.00
6 Semen Portland kg 4.0000 1,200.00 4,800.00
7 Pasir Beton m3 0.0060 137,500.00 825.00
8 Kerikil m3 0.0090 155,000.00 1,395.00
JUMLAH HARGA BAHAN 54,670.00
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (RP) JUMLAH HARGA (RP)
A TENAGA
1 Pekerja L.01 OH 0.2970 120,000.00 35,640.00
2 Tukang Batu L.02 OH 0.0330 150,000.00 4,950.00
3 Tukang Kayu L.02 OH 0.0330 160,000.00 5,280.00
4 Tukang Besi L.02 OH 0.0330 150,000.00 4,950.00
5 Kepala Tukang L.03 OH 0.0100 175,000.00 1,750.00
6 Mandor L.04 OH 0.0150 140,000.00 2,100.00
JUMLAH TENAGA KERJA 54,670.00
B BAHAN
1 Kayu Kelas III m3 0.0030 2,750,000.00 8,250.00
2 Paku 5 - 12 cm kg 0.0200 15,000.00 300.00
3 Minyak Bekisting liter - 40,000.00 -
4 Besi beton polos kg 3.6000 11,000.00 39,600.00
5 Kawat beton kg 0.0500 20,000.00 1,000.00
6 Semen Portland kg 5.5000 1,200.00 6,600.00
7 Pasir Beton m3 0.0090 137,500.00 1,237.50
8 Kerikil m3 0.0150 155,000.00 2,325.00
JUMLAH HARGA BAHAN 59,312.50
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (RP) JUMLAH HARGA (RP)
A TENAGA
1 Pekerja L.01 OH 0.0600 120,000.00 7,200.00
2 Tukang las konstruksi L.02 OH 0.0600 160,000.00 9,600.00
3 Kepala Tukang L.03 OH 0.0060 175,000.00 1,050.00
4 Mandor L.04 OH 0.0030 140,000.00 420.00
JUMLAH TENAGA KERJA 18,270.00
B BAHAN
1 Besi profil kg 1.1500 17,000.00 19,550.00
JUMLAH HARGA BAHAN 19,550.00
C PERALATAN
49 A5 Pekerjaan Plat Lantai/Dak atap beton bertulang f'c=19,3Mpa (K-250) + Besi 150 kg + Bekisting
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (RP) JUMLAH HARGA (RP)
A TENAGA
1 Pekerja L.01 OH 0.0600 120,000.00 7,200.00
2 Tukang las konstruksi L.02 OH 0.0600 160,000.00 9,600.00
3 Kepala Tukang L.03 OH 0.0060 175,000.00 1,050.00
4 Mandor L.04 OH 0.0030 140,000.00 420.00
JUMLAH TENAGA KERJA 18,270.00
B BAHAN
1 Besi Baja IWF kg 1.1500 17,000.00 19,550.00
JUMLAH HARGA BAHAN 19,550.00
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (RP) JUMLAH HARGA (RP)
A TENAGA
1 Pekerja L.01 OH 0.0430 120,000.00 5,160.00
2 Tukang Las L.02 OH 0.0430 160,000.00 6,880.00
3 Kepala Tukang L.03 OH 0.0043 175,000.00 752.50
4 Mandor L.04 OH 0.0021 140,000.00 294.00
JUMLAH TENAGA KERJA 13,086.50
B BAHAN
1 Profil alumunium kg 1.1000 110,000.00 121,000.00
2 Skrup fixer buah 2.0000 300.00 600.00
3 Sealant tube 0.0600 45,000.00 2,700.00
JUMLAH HARGA BAHAN 124,300.00
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (RP) JUMLAH HARGA (RP)
A TENAGA
1 Pekerja L.01 OH 0.0850 120,000.00 10,200.00
2 Tukang Las L.02 OH 0.0850 160,000.00 13,600.00
3 Kepala Tukang L.03 OH 0.0085 175,000.00 1,487.50
4 Mandor L.04 OH 0.0042 140,000.00 588.00
JUMLAH TENAGA KERJA 25,875.50
B BAHAN
1 Profil alumunium m 4.4000 165,000.00 726,000.00
2 Alumunium strip m 14.6000 60,000.00 876,000.00
JUMLAH HARGA BAHAN 1,602,000.00
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (RP) JUMLAH HARGA (RP)
A TENAGA
1 Pekerja L.01 OH 0.8500 120,000.00 102,000.00
2 Tukang Las L.02 OH 0.8500 160,000.00 136,000.00
3 Kepala Tukang L.03 OH 0.0900 175,000.00 15,750.00
4 Mandor L.04 OH 0.0050 140,000.00 700.00
JUMLAH TENAGA KERJA 254,450.00
B BAHAN
1 Profil alumunium m 4.4000 165,000.00 726,000.00
2 Profil kaca 5mm m2 1.4000 150,000.00 210,000.00
3 Sealant tube 0.7700 45,000.00 34,650.00
JUMLAH HARGA BAHAN 970,650.00
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (RP) JUMLAH HARGA (RP)
A TENAGA
1 Pekerja L.01 OH 0.3500 120,000.00 42,000.00
2 Tukang Las L.02 OH 0.3500 160,000.00 56,000.00
3 Kepala Tukang L.03 OH 0.0350 175,000.00 6,125.00
4 Mandor L.04 OH 0.0180 140,000.00 2,520.00
JUMLAH TENAGA KERJA 106,645.00
B BAHAN
1 Venetions Blinds dan Vertical m2 1.0000 200,000.00 200,000.00
Blinds
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (RP) JUMLAH HARGA (RP)
A TENAGA
1 Pekerja L.01 OH 1.6700 120,000.00 200,400.00
2 Tukang Las L.02 OH 1.6700 160,000.00 267,200.00
3 Kepala Tukang L.03 OH 0.1670 175,000.00 29,225.00
4 Mandor L.04 OH 0.0830 140,000.00 11,620.00
JUMLAH TENAGA KERJA 508,445.00
B BAHAN
1 Besi Strip m2 1.0000 11,000.00 11,000.00
9,026.67
2 Pengelasan cm 27.0800 333.33
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (RP) JUMLAH HARGA (RP)
A TENAGA
1 Pekerja L.01 OH 1.2000 120,000.00 144,000.00
2 Tukang Batu L.02 OH 0.2000 150,000.00 30,000.00
3 Kepala Tukang L.03 OH 0.0200 175,000.00 3,500.00
4 Mandor L.04 OH 0.0300 140,000.00 4,200.00
JUMLAH TENAGA KERJA 181,700.00
B BAHAN
1 Bata Merah buah 140.0000 1,250.00 175,000.00
2 Semen Portland kg 32.9500 1,200.00 39,540.00
3 Pasir Pasang m3 0.0910 137,500.00 12,512.50
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (RP) JUMLAH HARGA (RP)
A TENAGA
1 Pekerja L.01 OH 0.6000 120,000.00 72,000.00
2 Tukang Batu L.02 OH 0.2000 150,000.00 30,000.00
3 Kepala Tukang L.03 OH 0.0200 175,000.00 3,500.00
4 Mandor L.04 OH 0.0300 140,000.00 4,200.00
JUMLAH TENAGA KERJA 109,700.00
B BAHAN
1 Bata Merah buah 140.0000 1,250.00 175,000.00
2 Semen Portland kg 26.5500 1,200.00 31,860.00
3 Pasir Pasang m3 0.0930 137,500.00 12,787.50
JUMLAH HARGA BAHAN 219,647.50
C PERALATAN
59 A.4.4.1.8 Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1/2 bata campuran 1 SP : 3 PP
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (RP) JUMLAH HARGA (RP)
A TENAGA
1 Pekerja L.01 OH 0.3000 120,000.00 36,000.00
2 Tukang Batu L.02 OH 0.1000 150,000.00 15,000.00
3 Kepala Tukang L.03 OH 0.0100 175,000.00 1,750.00
4 Mandor L.04 OH 0.0150 140,000.00 2,100.00
JUMLAH TENAGA KERJA 54,850.00
B BAHAN
1 Bata Merah buah 70.0000 1,250.00 87,500.00
2 Semen Portland kg 14.3700 1,200.00 17,244.00
3 Pasir Pasang m3 0.0400 137,500.00 5,500.00
JUMLAH HARGA BAHAN 110,244.00
C PERALATAN
60 A.4.4.1.8 Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1/2 bata campuran 1 SP : 4 PP
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (RP) JUMLAH HARGA (RP)
A TENAGA
1 Pekerja L.01 OH 0.3000 120,000.00 36,000.00
2 Tukang Batu L.02 OH 0.1000 150,000.00 15,000.00
3 Kepala Tukang L.03 OH 0.0100 175,000.00 1,750.00
4 Mandor L.04 OH 0.0150 140,000.00 2,100.00
JUMLAH TENAGA KERJA 54,850.00
B BAHAN
1 Bata Merah buah 70.0000 1,250.00 87,500.00
2 Semen Portland kg 11.5000 1,200.00 13,800.00
3 Pasir Pasang m3 0.0430 137,500.00 5,912.50
JUMLAH HARGA BAHAN 107,212.50
C PERALATAN
11 A.4.4.1.9 Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1/2 bata campuran 1 SP : 5 PP
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (RP) JUMLAH HARGA (RP)
A TENAGA
1 Pekerja L.01 OH 0.3000 120,000.00 36,000.00
2 Tukang Batu L.02 OH 0.1000 150,000.00 15,000.00
3 Kepala Tukang L.03 OH 0.0100 175,000.00 1,750.00
4 Mandor L.04 OH 0.0150 140,000.00 2,100.00
JUMLAH TENAGA KERJA 54,850.00
B BAHAN
1 Bata Merah buah 70.0000 1,250.00 87,500.00
2 Semen Portland kg 9.6800 1,200.00 11,616.00
3 Pasir Pasang m3 0.0450 137,500.00 6,187.50
JUMLAH HARGA BAHAN 105,303.50
C PERALATAN
JUMLAH HARGA ALAT -
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (RP) JUMLAH HARGA (RP)
A TENAGA
1 Pekerja L.01 OH 0.3000 120,000.00 36,000.00
2 Tukang Batu L.02 OH 0.1500 150,000.00 22,500.00
3 Kepala Tukang L.03 OH 0.0150 175,000.00 2,625.00
4 Mandor L.04 OH 0.0150 140,000.00 2,100.00
JUMLAH TENAGA KERJA 63,225.00
B BAHAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (RP) JUMLAH HARGA (RP)
A TENAGA
1 Pekerja L.01 OH 0.3000 120,000.00 36,000.00
2 Tukang Batu L.02 OH 0.1500 150,000.00 22,500.00
3 Kepala Tukang L.03 OH 0.0150 175,000.00 2,625.00
4 Mandor L.04 OH 0.0150 140,000.00 2,100.00
JUMLAH TENAGA KERJA 63,225.00
B BAHAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (RP) JUMLAH HARGA (RP)
A TENAGA
1 Pekerja L.01 OH 0.3000 120,000.00 36,000.00
2 Tukang Batu L.02 OH 0.1500 150,000.00 22,500.00
3 Kepala Tukang L.03 OH 0.0150 175,000.00 2,625.00
4 Mandor L.04 OH 0.0150 140,000.00 2,100.00
JUMLAH TENAGA KERJA 63,225.00
B BAHAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (RP) JUMLAH HARGA (RP)
A TENAGA
1 Pekerja L.01 OH 0.3000 120,000.00 36,000.00
2 Tukang Batu L.02 OH 0.1500 150,000.00 22,500.00
3 Kepala Tukang L.03 OH 0.0150 175,000.00 2,625.00
4 Mandor L.04 OH 0.0150 140,000.00 2,100.00
JUMLAH TENAGA KERJA 63,225.00
B BAHAN
1 Semen Portland kg 6.2400 1,200.00 7,488.00
2 Pasir Pasang m3 0.0240 137,500.00 3,300.00
JUMLAH HARGA BAHAN 10,788.00
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (RP) JUMLAH HARGA (RP)
A TENAGA
1 Pekerja L.01 OH 0.3000 120,000.00 36,000.00
2 Tukang Batu L.02 OH 0.1500 150,000.00 22,500.00
3 Kepala Tukang L.03 OH 0.0150 175,000.00 2,625.00
4 Mandor L.04 OH 0.0150 140,000.00 2,100.00
JUMLAH TENAGA KERJA 63,225.00
B BAHAN
1 Semen Portland kg 5.1840 1,200.00 6,220.80
2 Pasir Pasang m3 0.0260 137,500.00 3,575.00
JUMLAH HARGA BAHAN 9,795.80
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (RP) JUMLAH HARGA (RP)
A TENAGA
1 Pekerja L.01 OH 0.1500 120,000.00 18,000.00
2 Tukang Batu L.02 OH 0.0750 150,000.00 11,250.00
3 Kepala Tukang L.03 OH 0.0080 175,000.00 1,400.00
4 Mandor L.04 OH 0.0080 140,000.00 1,120.00
JUMLAH TENAGA KERJA 31,770.00
B BAHAN
1 Semen Portland kg 3.1080 1,200.00 3,729.60
JUMLAH HARGA BAHAN 3,729.60
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (RP) JUMLAH HARGA (RP)
A TENAGA
1 Pekerja L.01 OH 0.3000 120,000.00 36,000.00
2 Tukang Batu L.02 OH 0.1500 150,000.00 22,500.00
3 Kepala Tukang L.03 OH 0.0150 175,000.00 2,625.00
4 Mandor L.04 OH 0.0150 140,000.00 2,100.00
JUMLAH TENAGA KERJA 63,225.00
B BAHAN
1 Semen Portland kg 6.3400 1,200.00 7,608.00
2 Pasir Pasang m3 0.0120 137,500.00 1,650.00
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (RP) JUMLAH HARGA (RP)
A TENAGA
1 Pekerja L.01 OH 0.2000 120,000.00 24,000.00
2 Tukang Batu L.02 OH 0.1000 150,000.00 15,000.00
3 Kepala Tukang L.03 OH 0.0100 175,000.00 1,750.00
4 Mandor L.04 OH 0.0100 140,000.00 1,400.00
JUMLAH TENAGA KERJA 42,150.00
B BAHAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (RP) JUMLAH HARGA (RP)
A TENAGA
1 Pekerja L.01 OH 0.2500 120,000.00 30,000.00
2 Tukang Batu L.02 OH 0.1250 150,000.00 18,750.00
3 Kepala Tukang L.03 OH 0.0130 175,000.00 2,275.00
4 Mandor L.04 OH 0.0130 140,000.00 1,820.00
JUMLAH TENAGA KERJA 52,845.00
B BAHAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (RP) JUMLAH HARGA (RP)
A TENAGA
1 Pekerja L.01 OH 0.2500 120,000.00 30,000.00
2 Tukang Batu L.02 OH 0.1250 150,000.00 18,750.00
3 Kepala Tukang L.03 OH 0.0130 175,000.00 2,275.00
4 Mandor L.04 OH 0.0130 140,000.00 1,820.00
JUMLAH TENAGA KERJA 52,845.00
B BAHAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (RP) JUMLAH HARGA (RP)
A TENAGA
1 Pekerja L.01 OH 0.2500 120,000.00 30,000.00
2 Tukang Batu L.02 OH 0.1250 150,000.00 18,750.00
3 Kepala Tukang L.03 OH 0.0130 175,000.00 2,275.00
4 Mandor L.04 OH 0.0130 140,000.00 1,820.00
JUMLAH TENAGA KERJA 52,845.00
B BAHAN
A TENAGA
1 Pekerja L.01 OH 0.0900 120,000.00 10,800.00
2 Tukang Batu L.02 OH 0.0900 150,000.00 13,500.00
3 Kepala Tukang L.03 OH 0.0090 175,000.00 1,575.00
4 Mandor L.04 OH 0.0050 140,000.00 700.00
JUMLAH TENAGA KERJA 26,575.00
B BAHAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (RP) JUMLAH HARGA (RP)
A TENAGA
1 Pekerja L.01 OH 0.0900 120,000.00 10,800.00
2 Tukang Batu L.02 OH 0.0900 150,000.00 13,500.00
3 Kepala Tukang L.03 OH 0.0090 175,000.00 1,575.00
4 Mandor L.04 OH 0.0050 140,000.00 700.00
JUMLAH TENAGA KERJA 26,575.00
B BAHAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (RP) JUMLAH HARGA (RP)
A TENAGA
1 Pekerja L.01 OH 0.1700 120,000.00 20,400.00
2 Tukang Batu L.02 OH 0.1700 150,000.00 25,500.00
3 Kepala Tukang L.03 OH 0.0170 175,000.00 2,975.00
4 Mandor L.04 OH 0.0090 140,000.00 1,260.00
JUMLAH TENAGA KERJA 50,135.00
B BAHAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (RP) JUMLAH HARGA (RP)
A TENAGA
1 Pekerja L.01 OH 0.7000 120,000.00 84,000.00
2 Tukang Kayu L.02 OH 0.3500 160,000.00 56,000.00
3 Kepala Tukang L.03 OH 0.0350 175,000.00 6,125.00
4 Mandor L.04 OH 0.0350 140,000.00 4,900.00
JUMLAH TENAGA KERJA 151,025.00
B BAHAN
A TENAGA
1 Pekerja L.01 OH 0.4000 120,000.00 48,000.00
2 Tukang Batu L.02 OH 0.2000 150,000.00 30,000.00
3 Kepala Tukang L.03 OH 0.0200 175,000.00 3,500.00
4 Mandor L.04 OH 0.0200 140,000.00 2,800.00
JUMLAH TENAGA KERJA 84,300.00
B BAHAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (RP) JUMLAH HARGA (RP)
A TENAGA
1 Pekerja L.01 OH 0.9000 120,000.00 108,000.00
2 Tukang Batu L.02 OH 0.4500 150,000.00 67,500.00
3 Kepala Tukang L.03 OH 0.0450 175,000.00 7,875.00
4 Mandor L.04 OH 0.0450 140,000.00 6,300.00
JUMLAH TENAGA KERJA 189,675.00
B BAHAN
A TENAGA
1 Pekerja L.01 OH 0.2500 120,000.00 30,000.00
2 Tukang Batu L.02 OH 0.5000 150,000.00 75,000.00
3 Kepala Tukang L.03 OH 0.0500 175,000.00 8,750.00
4 Mandor L.04 OH 0.0013 140,000.00 182.00
JUMLAH TENAGA KERJA 113,932.00
B BAHAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (RP) JUMLAH HARGA (RP)
A TENAGA
1 Pekerja L.01 OH 0.2500 120,000.00 30,000.00
2 Tukang Batu L.02 OH 0.5000 150,000.00 75,000.00
3 Kepala Tukang L.03 OH 0.0500 175,000.00 8,750.00
4 Mandor L.04 OH 0.0013 140,000.00 182.00
JUMLAH TENAGA KERJA 113,932.00
B BAHAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (RP) JUMLAH HARGA (RP)
A TENAGA
1 Pekerja L.01 OH 0.2500 120,000.00 30,000.00
2 Tukang kayu L.02 OH 0.5000 160,000.00 80,000.00
3 Kepala Tukang L.03 OH 0.0500 175,000.00 8,750.00
4 Mandor L.04 OH 0.0013 140,000.00 182.00
JUMLAH TENAGA KERJA 118,932.00
B BAHAN
A TENAGA
1 Pekerja L.01 OH 0.8000 120,000.00 96,000.00
2 Tukang kayu L.02 OH 0.8000 160,000.00 128,000.00
3 Kepala Tukang L.03 OH 0.0800 175,000.00 14,000.00
4 Mandor L.04 OH 0.0400 140,000.00 5,600.00
JUMLAH TENAGA KERJA 243,600.00
B BAHAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (RP) JUMLAH HARGA (RP)
A TENAGA
1 Pekerja L.01 OH 0.1000 120,000.00 12,000.00
2 Tukang kayu L.02 OH 0.1000 160,000.00 16,000.00
3 Kepala Tukang L.03 OH 0.0100 175,000.00 1,750.00
4 Mandor L.04 OH 0.0050 140,000.00 700.00
JUMLAH TENAGA KERJA 30,450.00
B BAHAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (RP) JUMLAH HARGA (RP)
A TENAGA
1 Pekerja L.01 OH 0.2000 120,000.00 24,000.00
2 Tukang kayu L.02 OH 0.1000 160,000.00 16,000.00
3 Kepala Tukang L.03 OH 0.0100 175,000.00 1,750.00
4 Mandor L.04 OH 0.0010 140,000.00 140.00
JUMLAH TENAGA KERJA 41,890.00
B BAHAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (RP) JUMLAH HARGA (RP)
A TENAGA
1 Pekerja L.01 OH 0.2000 120,000.00 24,000.00
2 Tukang kayu L.02 OH 0.1000 160,000.00 16,000.00
3 Kepala Tukang L.03 OH 0.0100 175,000.00 1,750.00
4 Mandor L.04 OH 0.0010 140,000.00 140.00
JUMLAH TENAGA KERJA 41,890.00
B BAHAN
A TENAGA
1 Pekerja L.01 OH 0.2500 120,000.00 30,000.00
2 Tukang kayu L.02 OH 0.1500 160,000.00 24,000.00
3 Kepala Tukang L.03 OH 0.0150 175,000.00 2,625.00
4 Mandor L.04 OH 0.0130 140,000.00 1,820.00
JUMLAH TENAGA KERJA 58,445.00
B BAHAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (RP) JUMLAH HARGA (RP)
A TENAGA
1 Pekerja L.01 OH 0.1200 120,000.00 14,400.00
2 Tukang kayu L.02 OH 0.0600 160,000.00 9,600.00
3 Kepala Tukang L.03 OH 0.0060 175,000.00 1,050.00
4 Mandor L.04 OH 0.0060 140,000.00 840.00
JUMLAH TENAGA KERJA 25,890.00
B BAHAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (RP) JUMLAH HARGA (RP)
A TENAGA
1 Pekerja L.01 OH 0.1500 120,000.00 18,000.00
2 Tukang kayu L.02 OH 0.0500 160,000.00 8,000.00
3 Kepala Tukang L.03 OH 0.0050 175,000.00 875.00
4 Mandor L.04 OH 0.0050 140,000.00 700.00
JUMLAH TENAGA KERJA 27,575.00
B BAHAN
22 A.4.6.1.1 Pembuatan dan Pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas II
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (RP) JUMLAH HARGA (RP)
A TENAGA
1 Pekerja L.01 OH 6.5000 120,000.00 780,000.00
2 Tukang kayu L.02 OH 18.0000 160,000.00 2,880,000.00
3 Kepala Tukang L.03 OH 1.8000 175,000.00 315,000.00
4 Mandor L.04 OH 1.3000 140,000.00 182,000.00
JUMLAH TENAGA KERJA 4,157,000.00
B BAHAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (RP) JUMLAH HARGA (RP)
A TENAGA
1 Pekerja L.01 OH 0.3500 120,000.00 42,000.00
2 Tukang kayu L.02 OH 1.0500 160,000.00 168,000.00
3 Kepala Tukang L.03 OH 0.1050 175,000.00 18,375.00
4 Mandor L.04 OH 0.0180 140,000.00 2,520.00
JUMLAH TENAGA KERJA 230,895.00
B BAHAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (RP) JUMLAH HARGA (RP)
A TENAGA
1 Pekerja L.01 OH 1.2000 120,000.00 144,000.00
2 Tukang kayu L.02 OH 3.0000 160,000.00 480,000.00
3 Kepala Tukang L.03 OH 0.3000 175,000.00 52,500.00
4 Mandor L.04 OH 0.0500 140,000.00 7,000.00
JUMLAH TENAGA KERJA 683,500.00
B BAHAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (RP) JUMLAH HARGA (RP)
A TENAGA
1 Pekerja L.01 OH 0.8000 120,000.00 96,000.00
2 Tukang kayu L.02 OH 2.4000 160,000.00 384,000.00
3 Kepala Tukang L.03 OH 0.2400 175,000.00 42,000.00
4 Mandor L.04 OH 0.0400 140,000.00 5,600.00
JUMLAH TENAGA KERJA 527,600.00
B BAHAN
25 A.4.6.1.6 Pembuatan dan Pemasangan 1 m2 pintu double tripleks + alumunium ,rangka kayu kelas II
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (RP) JUMLAH HARGA (RP)
A TENAGA
1 Pekerja L.01 OH 1.0000 120,000.00 120,000.00
2 Tukang kayu L.02 OH 2.5000 160,000.00 400,000.00
3 Kepala Tukang L.03 OH 0.2500 175,000.00 43,750.00
4 Mandor L.04 OH 0.0500 140,000.00 7,000.00
JUMLAH TENAGA KERJA 570,750.00
B BAHAN
25 A.4.6.1.6 Pembuatan dan Pemasangan 1 m2 pintu double tripleks ,rangka kayu kelas II
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (RP) JUMLAH HARGA (RP)
A TENAGA
1 TENAGA 0 OH 1.0000 120,000.00 120,000.00
2 Pekerja L.01 OH 2.5000 160,000.00 400,000.00
3 Tukang kayu L.02 OH 0.2500 175,000.00 43,750.00
4 Kepala Tukang L.03 OH 0.0500 140,000.00 7,000.00
JUMLAH TENAGA KERJA 570,750.00
B BAHAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (RP) JUMLAH HARGA (RP)
A TENAGA
1 Pekerja L.01 OH 4.0000 120,000.00 480,000.00
2 Tukang kayu L.02 OH 12.0000 160,000.00 1,920,000.00
3 Kepala Tukang L.03 OH 1.2000 175,000.00 210,000.00
4 Mandor L.04 OH 0.2000 140,000.00 28,000.00
JUMLAH TENAGA KERJA 2,638,000.00
B BAHAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (RP) JUMLAH HARGA (RP)
A TENAGA
1 Pekerja L.01 OH 0.1500 120,000.00 18,000.00
2 Tukang kayu L.02 OH 0.3000 160,000.00 48,000.00
3 Kepala Tukang L.03 OH 0.0300 175,000.00 5,250.00
4 Mandor L.04 OH 0.0750 140,000.00 10,500.00
JUMLAH TENAGA KERJA 81,750.00
B BAHAN
A TENAGA
1 Pekerja L.01 OH 0.2000 120,000.00 24,000.00
2 Tukang kayu L.02 OH 0.3000 160,000.00 48,000.00
3 Kepala Tukang L.03 OH 0.0300 175,000.00 5,250.00
4 Mandor L.04 OH 0.0100 140,000.00 1,400.00
JUMLAH TENAGA KERJA 78,650.00
B BAHAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (RP) JUMLAH HARGA (RP)
A TENAGA
1 Pekerja L.01 OH 0.1000 120,000.00 12,000.00
2 Tukang kayu L.02 OH 0.2000 160,000.00 32,000.00
3 Kepala Tukang L.03 OH 0.0200 175,000.00 3,500.00
4 Mandor L.04 OH 0.0050 140,000.00 700.00
JUMLAH TENAGA KERJA 48,200.00
B BAHAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (RP) JUMLAH HARGA (RP)
A TENAGA
1 Pekerja L.01 OH 0.1000 120,000.00 12,000.00
2 Tukang kayu L.02 OH 0.2000 160,000.00 32,000.00
3 Kepala Tukang L.03 OH 0.0200 175,000.00 3,500.00
4 Mandor L.04 OH 0.0050 140,000.00 700.00
JUMLAH TENAGA KERJA 48,200.00
B BAHAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (RP) JUMLAH HARGA (RP)
A TENAGA
1 Pekerja L.01 OH 0.1500 120,000.00 18,000.00
2 Tukang kayu L.02 OH 0.4500 160,000.00 72,000.00
3 Kepala Tukang L.03 OH 0.0450 175,000.00 7,875.00
4 Mandor L.04 OH 0.0080 140,000.00 1,120.00
JUMLAH TENAGA KERJA 98,995.00
B BAHAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (RP) JUMLAH HARGA (RP)
A TENAGA
1 Pekerja L.01 OH 0.2000 120,000.00 24,000.00
2 Tukang kayu L.02 OH 0.6000 160,000.00 96,000.00
3 Kepala Tukang L.03 OH 0.0600 175,000.00 10,500.00
4 Mandor L.04 OH 0.0100 140,000.00 1,400.00
JUMLAH TENAGA KERJA 131,900.00
B BAHAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (RP) JUMLAH HARGA (RP)
A TENAGA
1 Pekerja L.01 OH 0.6000 120,000.00 72,000.00
2 Tukang kayu L.02 OH 1.8000 160,000.00 288,000.00
3 Kepala Tukang L.03 OH 0.1800 175,000.00 31,500.00
4 Mandor L.04 OH 0.0300 140,000.00 4,200.00
JUMLAH TENAGA KERJA 395,700.00
B BAHAN
A TENAGA
1 Pekerja L.01 OH 0.0100 120,000.00 1,200.00
2 Tukang kayu L.02 OH 0.5000 160,000.00 80,000.00
3 Kepala Tukang L.03 OH 0.0500 175,000.00 8,750.00
4 Mandor L.04 OH 0.0050 140,000.00 700.00
JUMLAH TENAGA KERJA 90,650.00
B BAHAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (RP) JUMLAH HARGA (RP)
A TENAGA
1 Pekerja L.01 OH 0.0150 120,000.00 1,800.00
2 Tukang kayu L.02 OH 0.1500 160,000.00 24,000.00
3 Kepala Tukang L.03 OH 0.0150 175,000.00 2,625.00
4 Mandor L.04 OH 0.0008 140,000.00 112.00
JUMLAH TENAGA KERJA 28,537.00
B BAHAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (RP) JUMLAH HARGA (RP)
A TENAGA
1 Pekerja L.01 OH 0.0100 120,000.00 1,200.00
2 Tukang kayu L.02 OH 0.1000 160,000.00 16,000.00
3 Kepala Tukang L.03 OH 0.0100 175,000.00 1,750.00
4 Mandor L.04 OH 0.0005 140,000.00 70.00
JUMLAH TENAGA KERJA 19,020.00
B BAHAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (RP) JUMLAH HARGA (RP)
A TENAGA
1 Pekerja L.01 OH 0.0150 120,000.00 1,800.00
2 Tukang kayu L.02 OH 0.1500 160,000.00 24,000.00
3 Kepala Tukang L.03 OH 0.0150 175,000.00 2,625.00
4 Mandor L.04 OH 0.0008 140,000.00 112.00
JUMLAH TENAGA KERJA 28,537.00
B BAHAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (RP) JUMLAH HARGA (RP)
A TENAGA
1 Pekerja L.01 OH 0.0150 120,000.00 1,800.00
2 Tukang kayu L.02 OH 0.1500 160,000.00 24,000.00
3 Kepala Tukang L.03 OH 0.0150 175,000.00 2,625.00
4 Mandor L.04 OH 0.0008 140,000.00 112.00
JUMLAH TENAGA KERJA 28,537.00
B BAHAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (RP) JUMLAH HARGA (RP)
A TENAGA
1 Pekerja L.01 OH 0.0150 120,000.00 1,800.00
2 Tukang kayu L.02 OH 0.1500 160,000.00 24,000.00
3 Kepala Tukang L.03 OH 0.0150 175,000.00 2,625.00
4 Mandor L.04 OH 0.0008 140,000.00 112.00
JUMLAH TENAGA KERJA 28,537.00
B BAHAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (RP) JUMLAH HARGA (RP)
A TENAGA
1 Pekerja L.01 OH 0.1500 120,000.00 18,000.00
2 Tukang kayu L.02 OH - 160,000.00 -
3 Kepala Tukang L.03 OH - 175,000.00 -
4 Mandor L.04 OH 0.0030 140,000.00 420.00
JUMLAH TENAGA KERJA 18,420.00
B BAHAN
32 A.4.7.1.4 1 m2 pengecatan bidang kayu baru (1 lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup)
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (RP) JUMLAH HARGA (RP)
A TENAGA
1 Pekerja L.01 OH 0.0700 120,000.00 8,400.00
2 Tukang cat L.02 OH 0.0090 150,000.00 1,350.00
3 Kepala Tukang L.03 OH 0.0060 175,000.00 1,050.00
4 Mandor L.04 OH 0.0030 140,000.00 420.00
JUMLAH TENAGA KERJA 11,220.00
B BAHAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (RP) JUMLAH HARGA (RP)
A TENAGA
1 Pekerja L.01 OH 0.1600 120,000.00 19,200.00
2 Tukang cat L.02 OH 0.1600 150,000.00 24,000.00
3 Kepala Tukang L.03 OH 0.0160 175,000.00 2,800.00
4 Mandor L.04 OH 0.0030 140,000.00 420.00
JUMLAH TENAGA KERJA 46,420.00
B BAHAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (RP) JUMLAH HARGA (RP)
A TENAGA
1 Pekerja 0 OH 0.0250 120,000.00 3,000.00
2 Tukang 0 OH 0.0750 150,000.00 11,250.00
3 Kepala Tukang 0 OH 0.0063 175,000.00 1,102.50
4 Mandor 0 OH 0.0030 140,000.00 420.00
JUMLAH TENAGA KERJA 15,772.50
B BAHAN
cat interior
1 Cat dasar kg 0.1500 45,000.00 6,750.00
2 Cat Penutup kg 0.2600 65,000.00 16,900.00
34 A.4.7.1.10 Pengecatan 1 m2 cat eksterior tembok baru ( 1 lapis cat dasar, 2 lapis cat penutup)
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (RP) JUMLAH HARGA (RP)
A TENAGA
1 Pekerja L.01 OH 0.0500 120,000.00 6,000.00
2 Tukang cat L.02 OH 0.0750 150,000.00 11,250.00
3 Kepala Tukang L.03 OH 0.0063 175,000.00 1,102.50
4 Mandor L.04 OH 0.0030 140,000.00 420.00
JUMLAH TENAGA KERJA 18,772.50
B BAHAN
cat eksterior
1 Cat dasar kg 0.1500 65,000.00 9,750.00
2 Cat Penutup kg 0.2600 102,500.00 26,650.00
A TENAGA
1 Pekerja L.01 OH 0.0250 120,000.00 3,000.00
2 Tukang cat L.02 OH 0.0750 150,000.00 11,250.00
3 Kepala Tukang L.03 OH 0.0063 175,000.00 1,102.50
4 Mandor L.04 OH 0.0030 140,000.00 420.00
JUMLAH TENAGA KERJA 15,772.50
B BAHAN
cat interior
1 Cat dasar kg 0.1500 45,000.00 6,750.00
2 Cat Penutup kg 0.2600 65,000.00 16,900.00
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (RP) JUMLAH HARGA (RP)
A TENAGA
1 Pekerja L.01 OH 0.0200 120,000.00 2,400.00
2 Tukang cat L.02 OH 0.2000 150,000.00 30,000.00
3 Kepala Tukang L.03 OH 0.0200 175,000.00 3,500.00
4 Mandor L.04 OH 0.0025 140,000.00 350.00
JUMLAH TENAGA KERJA 36,250.00
B BAHAN
A TENAGA
1 Pekerja L.01 OH 0.4000 120,000.00 48,000.00
2 Tukang cat L.02 OH 0.8000 150,000.00 120,000.00
3 Kepala Tukang L.03 OH 0.0800 175,000.00 14,000.00
4 Mandor L.04 OH 0.0200 140,000.00 2,800.00
JUMLAH TENAGA KERJA 184,800.00
B BAHAN
1 Cat dasar kg 0.1100 33,000.00 3,630.00
2 Cat antara kg 0.1700 60,000.00 10,200.00
3 Cat penutup kg 0.0800 58,000.00 4,640.00
4 Kuas bh 0.0100 60,000.00 600.00
5 Pengencer LTR 0.0100 20,000.00 200.00
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (RP) JUMLAH HARGA (RP)
A TENAGA
1 Pekerja L.01 OH 3.3000 120,000.00 396,000.00
2 Tukang batu L.02 OH 1.1000 150,000.00 165,000.00
3 Kepala Tukang L.03 OH 0.0100 175,000.00 1,750.00
4 Mandor L.04 OH 0.1600 140,000.00 22,400.00
JUMLAH TENAGA KERJA 585,150.00
B BAHAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (RP) JUMLAH HARGA (RP)
A TENAGA
1 Pekerja L.01 OH 1.0000 120,000.00 120,000.00
2 Tukang batu L.02 OH 1.5000 150,000.00 225,000.00
3 Kepala Tukang L.03 OH 0.1500 175,000.00 26,250.00
4 Mandor L.04 OH 0.1600 140,000.00 22,400.00
JUMLAH TENAGA KERJA 393,650.00
B BAHAN
A TENAGA
1 Pekerja L.01 OH 0.0100 120,000.00 1,200.00
2 Tukang batu L.02 OH 0.1000 150,000.00 15,000.00
3 Kepala Tukang L.03 OH 0.0100 175,000.00 1,750.00
4 Mandor L.04 OH 0.0050 140,000.00 700.00
JUMLAH TENAGA KERJA 18,650.00
B BAHAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (RP) JUMLAH HARGA (RP)
A TENAGA
1 Pekerja L.01 OH 1.2000 120,000.00 144,000.00
2 Tukang batu L.02 OH 1.4500 150,000.00 217,500.00
3 Kepala Tukang L.03 OH 0.1500 175,000.00 26,250.00
4 Mandor L.04 OH 0.0600 140,000.00 8,400.00
JUMLAH TENAGA KERJA 396,150.00
B BAHAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (RP) JUMLAH HARGA (RP)
A TENAGA
1 Pekerja L.01 OH 0.0100 120,000.00 1,200.00
2 Tukang batu L.02 OH 0.1000 150,000.00 15,000.00
3 Kepala Tukang L.03 OH 0.0100 175,000.00 1,750.00
4 Mandor L.04 OH 0.0050 140,000.00 700.00
JUMLAH TENAGA KERJA 18,650.00
B BAHAN
119 A.5.1.1.15 Pemasangan 1 buah bak kontrol pasangan bata 30x30 tinggi 35 cm
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (RP) JUMLAH HARGA (RP)
A TENAGA
1 Pekerja L.01 OH 2.1600 120,000.00 259,200.00
2 Tukang batu L.02 OH 0.7200 150,000.00 108,000.00
3 Kepala Tukang L.03 OH 0.0720 175,000.00 12,600.00
4 Mandor L.04 OH 0.0110 140,000.00 1,540.00
JUMLAH TENAGA KERJA 381,340.00
B BAHAN
120 A.5.1.1.16 Pemasangan 1 buah bak kontrol pasangan bata 45x45 tinggi 50 cm
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (RP) JUMLAH HARGA (RP)
A TENAGA
1 Pekerja L.01 OH 3.2000 120,000.00 384,000.00
2 Tukang batu L.02 OH 1.1500 150,000.00 172,500.00
3 Kepala Tukang L.03 OH 0.0110 175,000.00 1,925.00
4 Mandor L.04 OH 0.0160 140,000.00 2,240.00
JUMLAH TENAGA KERJA 560,665.00
B BAHAN
121 A.5.1.1.17 Pemasangan 1 buah bak kontrol pasangan bata 60x60 tinggi 65 cm
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (RP) JUMLAH HARGA (RP)
A TENAGA
1 Pekerja L.01 OH 3.2000 120,000.00 384,000.00
2 Tukang batu L.02 OH 1.1500 150,000.00 172,500.00
3 Kepala Tukang L.03 OH 0.0110 175,000.00 1,925.00
4 Mandor L.04 OH 0.0160 140,000.00 2,240.00
JUMLAH TENAGA KERJA 560,665.00
B BAHAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (RP) JUMLAH HARGA (RP)
A TENAGA
1 Pekerja L.01 OH 0.0540 120,000.00 6,480.00
2 Tukang batu L.02 OH 0.0900 150,000.00 13,500.00
3 Kepala Tukang L.03 OH 0.0090 175,000.00 1,575.00
4 Mandor L.04 OH 0.0270 140,000.00 3,780.00
JUMLAH TENAGA KERJA 25,335.00
B BAHAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (RP) JUMLAH HARGA (RP)
A TENAGA
1 Pekerja L.01 OH 0.0540 120,000.00 6,480.00
2 Tukang batu L.02 OH 0.0900 150,000.00 13,500.00
3 Kepala Tukang L.03 OH 0.0090 175,000.00 1,575.00
4 Mandor L.04 OH 0.0270 140,000.00 3,780.00
JUMLAH TENAGA KERJA 25,335.00
B BAHAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (RP) JUMLAH HARGA (RP)
A TENAGA
1 Pekerja L.01 OH 0.0540 120,000.00 6,480.00
2 Tukang Batu L.02 OH 0.0900 150,000.00 13,500.00
3 Kepala Tukang L.03 OH 0.0090 175,000.00 1,575.00
4 Mandor L.04 OH 0.0270 140,000.00 3,780.00
JUMLAH TENAGA KERJA 25,335.00
B BAHAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (RP) JUMLAH HARGA (RP)
A TENAGA
1 Pekerja L.01 OH 0.0540 120,000.00 6,480.00
2 Tukang Batu L.02 OH 0.0900 150,000.00 13,500.00
3 Kepala Tukang L.03 OH 0.0090 175,000.00 1,575.00
4 Mandor L.04 OH 0.0270 140,000.00 3,780.00
JUMLAH TENAGA KERJA 25,335.00
B BAHAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (RP) JUMLAH HARGA (RP)
A TENAGA
1 Pekerja L.01 OH 0.0200 120,000.00 2,400.00
2 Tukang cat L.02 OH 0.0630 150,000.00 9,450.00
3 Kepala Tukang L.03 OH 0.0063 175,000.00 1,102.50
4 Mandor L.04 OH 0.0030 140,000.00 420.00
JUMLAH TENAGA KERJA 13,372.50
B BAHAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (RP) JUMLAH HARGA (RP)
A TENAGA
1 Pekerja L.01 OH 0.0850 120,000.00 10,200.00
2 Tukang besi L.02 OH 0.0850 150,000.00 12,750.00
3 Kepala Tukang L.03 OH 0.0085 175,000.00 1,487.50
4 Mandor L.04 OH 0.0050 140,000.00 700.00
JUMLAH TENAGA KERJA 25,137.50
B BAHAN
1 Alumunium Profil bingkai pintu m1 4.4000 165,000.00 726,000.00
2 Sekrup kg 8.0000 300.00 2,400.00
3 Kaca 5mm m2 1.2000 150,000.00 180,000.00
4 Sealant tube 1.5500 45,000.00 69,750.00
JUMLAH HARGA BAHAN 978,150.00
C PERALATAN
JUMLAH HARGA ALAT -
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (RP) JUMLAH HARGA (RP)
A TENAGA
1 Pekerja L.01 OH 0.0850 120,000.00 10,200.00
2 Tukang Besi L.02 OH 0.0850 150,000.00 12,750.00
3 Kepala Tukang L.03 OH 0.0085 175,000.00 1,487.50
4 Mandor L.04 OH 0.0050 140,000.00 700.00
JUMLAH TENAGA KERJA 25,137.50
B BAHAN
1 Alumunium Profil bingkai jendela m1 4.4000 95,000.00 418,000.00
2 Sekrup kg 8.0000 300.00 2,400.00
3 Kaca 5mm m2 1.2000 150,000.00 180,000.00
4 Sealant tube 1.5500 45,000.00 69,750.00
JUMLAH HARGA BAHAN 670,150.00
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (RP) JUMLAH HARGA (RP)
A TENAGA
1 Pekerja L.01 OH 0.0150 120,000.00 1,800.00
2 Tukang Besi L.02 OH 0.1500 150,000.00 22,500.00
3 Kepala Tukang L.03 OH 0.0150 175,000.00 2,625.00
4 Mandor L.04 OH 0.0008 140,000.00 112.00
JUMLAH TENAGA KERJA 27,037.00
B BAHAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (RP) JUMLAH HARGA (RP)
A TENAGA
1 Pekerja L.01 OH 0.1500 120,000.00 18,000.00
2 Tukang Besi L.02 OH 0.2500 150,000.00 37,500.00
3 Kepala Tukang L.03 OH 0.0250 175,000.00 4,375.00
4 Mandor L.04 OH 0.0025 140,000.00 350.00
JUMLAH TENAGA KERJA 60,225.00
B BAHAN
1 Besi hollow galvanis 2x4 btg 0.5500 28,000.00 15,400.00
2 Besi hollow galvais 4x4 btg 0.5500 36,000.00 19,800.00
3 sekrup bh 4.0000 300.00 1,200.00
4 Kawat gantungan kg 0.0500 25,000.00 1,250.00
JUMLAH HARGA BAHAN 37,650.00
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (RP) JUMLAH HARGA (RP)
A TENAGA
1 Pekerja L.01 OH 0.1500 120,000.00 18,000.00
2 Tukang Besi L.02 OH 0.2500 150,000.00 37,500.00
3 Kepala Tukang L.03 OH 0.0250 175,000.00 4,375.00
4 Mandor L.04 OH 0.0025 140,000.00 350.00
JUMLAH TENAGA KERJA 60,225.00
B BAHAN
1 a. Main Truss C.75-0,75 btg 0.8250 80,000.00 66,000.00
2 b. Reng R 33-0,45 btg 0.8250 40,000.00 33,000.00
3 c. Skrup Truss dia. 6-20 mm bh 8.0000 400.00 3,200.00
4 d. Skrup reng dia 4-16 mm bh 4.0000 400.00 1,600.00
5 e. Dynabol dia. 12-120 mm bh 0.5000 850.00 425.00
JUMLAH HARGA BAHAN 104,225.00
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (RP) JUMLAH HARGA (RP)
A TENAGA
1 Pekerja L.01 OH 0.0450 120,000.00 5,400.00
2 Tukang Listrik L.02 OH 0.4500 160,000.00 72,000.00
3 Kepala Tukang L.03 OH 0.0450 175,000.00 7,875.00
4 Mandor L.04 OH - 140,000.00 -
JUMLAH TENAGA KERJA 85,275.00
B BAHAN
1 Kabel NYM 2 x 2,5 mm m1 8.0000 11,750.00 94,000.00
2 accecories ls 1.0000 7,500.00 7,500.00
-
JUMLAH HARGA BAHAN 101,500.00
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (RP) JUMLAH HARGA (RP)
A TENAGA
1 Pekerja L.01 OH 0.2000 120,000.00 24,000.00
2 Tukang Listrik L.02 OH 0.0200 160,000.00 3,200.00
3 Kepala Tukang L.03 OH 0.0200 175,000.00 3,500.00
4 Mandor L.04 OH - 140,000.00 -
JUMLAH TENAGA KERJA 30,700.00
B BAHAN
1 Lampu SL 8 Watt bh 1.0000 49,000.00 49,000.00
2 Fitting Downlight dia. 15cm bh 1.0000 35,000.00 35,000.00
-
JUMLAH HARGA BAHAN 84,000.00
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (RP) JUMLAH HARGA (RP)
A TENAGA
1 Pekerja L.01 OH 0.2000 120,000.00 24,000.00
2 Tukang Listrik L.02 OH 0.0200 160,000.00 3,200.00
3 Kepala Tukang L.03 OH 0.0200 175,000.00 3,500.00
4 Mandor L.04 OH - 140,000.00 -
JUMLAH TENAGA KERJA 30,700.00
B BAHAN
1 Lampu SL 18 Watt bh 1.0000 82,000.00 82,000.00
2 Fitting Downlight dia. 15cm bh 1.0000 35,000.00 35,000.00
-
JUMLAH HARGA BAHAN 117,000.00
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (RP) JUMLAH HARGA (RP)
A TENAGA
1 Pekerja L.01 OH 0.1000 120,000.00 12,000.00
2 Tukang Listrik L.02 OH 0.0200 160,000.00 3,200.00
3 Kepala Tukang L.03 OH 0.0200 175,000.00 3,500.00
4 Mandor L.04 OH - 140,000.00 -
JUMLAH TENAGA KERJA 18,700.00
B BAHAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (RP) JUMLAH HARGA (RP)
A TENAGA
1 Pekerja L.01 OH 0.1000 120,000.00 12,000.00
2 Tukang Listrik L.02 OH 0.0200 160,000.00 3,200.00
3 Kepala Tukang L.03 OH 0.0200 175,000.00 3,500.00
4 Mandor L.04 OH - 140,000.00 -
JUMLAH TENAGA KERJA 18,700.00
B BAHAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (RP) JUMLAH HARGA (RP)
A TENAGA
1 Pekerja L.01 OH 0.1000 120,000.00 12,000.00
2 Tukang Listrik L.02 OH 0.0200 160,000.00 3,200.00
3 Kepala Tukang L.03 OH 0.0200 175,000.00 3,500.00
4 Mandor L.04 OH - 140,000.00 -
JUMLAH TENAGA KERJA 18,700.00
B BAHAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (RP) JUMLAH HARGA (RP)
A TENAGA
1 Pekerja L.01 OH 0.1000 120,000.00 12,000.00
2 Tukang Listrik L.02 OH 0.0200 160,000.00 3,200.00
3 Kepala Tukang L.03 OH 0.0200 175,000.00 3,500.00
4 Mandor L.04 OH - 140,000.00 -
JUMLAH TENAGA KERJA 18,700.00
B BAHAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (RP) JUMLAH HARGA (RP)
A TENAGA
1 Pekerja L.01 OH 0.1500 120,000.00 18,000.00
2 Tukang Besi L.02 OH 0.2500 160,000.00 40,000.00
3 Kepala Tukang L.03 OH 0.0250 175,000.00 4,375.00
4 Mandor L.04 OH 0.0025 140,000.00 350.00
JUMLAH TENAGA KERJA 62,725.00
B BAHAN
1 Besi hollow galvanis 2x4 m 2.2000 9,700.00 21,340.00
2 Besi hollow galvais 4x4 m 2.2000 17,000.00 37,400.00
3 sekrup bh 4.0000 600.00 2,400.00
4 Kawat gantungan kg 0.0500 15,000.00 750.00
JUMLAH HARGA BAHAN 61,890.00
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (RP) JUMLAH HARGA (RP)
A TENAGA
1 TENAGA 0 OH 0.100 120,000.00 12,000.00
2 Pekerja L.01 OH 0.050 160,000.00 8,000.00
3 Tukang Besi L.02 OH 0.005 175,000.00 875.00
4 Kepala Tukang L.03 OH 0.005 140,000.00 700.00
JUMLAH TENAGA KERJA 21,575.00
B BAHAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (RP) JUMLAH HARGA (RP)
A TENAGA
1 TENAGA 0 OH 0.100 120,000.00 12,000.00
2 Pekerja L.01 OH 0.050 160,000.00 8,000.00
3 Tukang Besi L.02 OH 0.005 175,000.00 875.00
4 Kepala Tukang L.03 OH 0.005 140,000.00 700.00
JUMLAH TENAGA KERJA 21,575.00
B BAHAN
4 Rangka Plafond
(plafond dapur belakang) 8.14 2.75
1.35 3.6
c bagian eksterior
teras 2.86 1.75
depan 5.14 1
kiri 9.5 1
kanan 9.5 1
90.600 0.13
39 Pekerjaan Pengecatan Kusen,pintu,jendela dan ventilasi
KUSEN
PVJ 16.250
PV1 20.700
PV2 6.900
P1 10.200
P2 5.000
JV1 23.600
V1 7.950
90.600 0.295
PINTU
PVJ 3.78
PV1 10.08
PV2 3.36
P1 6.72
P2 1.47
JENDELA
PVJ 0.56
JV1 2.24
VENTILASI
PVJ 2.6
PV1 2.4
PV2 0.8
JV1 2.8
V1 2.6
11.2 0.36
JUMLAH
22.385
4.86
jumlah 27.245
22.385
4.86
16.452
jumlah 43.697
10
3
3
jumlah 16.000
104.1
22.385
4.86
jumlah 27.245
22.385
4.86 4
6.468
2.61 5
13.8996
11.0396 6.468
11.0396 228
3.4596
3.4596 30
jumlah 72.753 5
5.005
5.14
9.5
9.5
jumlah 29.145
17.44
13.44
13.44
7.44
7.44
26.17
16
20.6
20.6
jumlah 142.570
16.250
20.700
6.900
5.1 1 0.000
10.200
5.000
1.44 2 0.000
0.32 2 0.000
23.600
7.950
90.600
0.05 0.5889 m3
26.727 m2
25.41 m2
2.8 m2
4.032 m2
58.969 m2
31.5846
2.85
2.85
0.9
0.9
7.5
RENCANA ANGGARAN BIAYA
PEMBANGUNAN RUKO RING ROAD
NO PEKERJAAN VOLUME SATUAN HARGA SATUAN JUMLAH
JUMLAH Rp 721,579,044.61
PPN 10 %
JUMLAH TOTAL Rp 721,579,044.61
DIBULATKAN Rp 721,579,044.61
TERBILANG
LUAS LT 1 135 M2
LT 2 142.5 M2
JUMLAH 277.5 M2 Rp 2,600,284.85
HARGA/M2
MANADO, 8 MARET 2018
CV. L'COMER CONSULTANT
Rp 14.29
Rp 142.50
Rp 50,000.00
JEMMY V. ROGI,ST Rp 7,125,000.00
DIREKTUR
GALIAN TELAPAK Rp 250,000 TITIK
GALIAN PONDASI Rp 150,000 M1
TIMBUNAN TANAH Rp 25,000 M2
COR LANTAI DASAR Rp 50,000 M2
COR SLOOF BESI MAL Rp 75,000 M1
COR KOLOM BESI MAL Rp 150,000 M1
COR KOLOM PRAKTIS Rp 50,000 M1
COR BALOK PLAT BESI MAL Rp 150,000 M1
PASANG MAL UNTUK PLAT Rp 200,000 M2 125000 150000
PASANG BATA Rp 60,000 M2 45000
PLESTER Rp 30,000 M2 25000
ACI Rp 20,000 M2 15000
PLESTER ACI DINDING LUAR Rp 75,000 M2
PASANG ATAP Rp 45,000 M2
KOLOM 35 35 0.1225 M2
0.001608
1.312392
BALOK 25 40 0.1
0.001407
1.40672
SLOOF 20 X 30 0.06
0.000678
1.1304
KOLOM 25 X 25 0.0625
0.000904
1.446912
BALOK 20 X 30 0.06
0.000804
1.339733
11.34 57000
14
0.62 8.68
98.4312
10000 86800
984312
246078