Anda di halaman 1dari 4

CURRICULUM SUMMARY

PERSONAL INFORMATION

Name: Guillermo Albornoz


Birth Date: April 02- 1958
Marital Status: Divorced
Number of Children: 2
Address: Maracaibo Zulia-Venezuela
Phone: 0414 601 6995
E-mail: alphia.ga@gmail.com

LABOR EXPERIENCE
PERIOD

1999-2009
COMPANY: EHCOPEK
Construction Superintendent
Implement process changes for continuous improvement.
Planning, control, monitoring, management meetings to advance work,
personnel management, quality management system, safety and progress
reports and financial work.
Responsible for all scheduling of all construction activities.
Followed up and monitored the continuous progress of works on site.
Assisted the Site Construction Manager on construction procedures,
observed the safety procedures followed by the company.
Directed and Coordinated activities, reviewed project proposal and
established work plan.
Followed up and monitored the continuous progress of works at sites.
Acted as interface between end-users, contractors, suppliers, filling station
project manager and others engineering project staff.
Followed up and monitors the continuous progress of works at sites to
ensure implementation of project plans and schedules, technical
compliances with specifications and users requirements.
Directed and Coordinated activities, reviewed project proposal and
established work plan.

Relevant Projects:

Construction Flow station EF- 23-5, 30.000 BPD, Offshore –


Venezuela.
Construction, lifting, installation, connection, commissioning.
Construction Compression Gas plant Maturin Planta 100, Morichal
Onshore - Venezuela.
Construction, installation, operation & maintenance

Página 1 de 4
COMPANY: FLAG INSTALACIONES 1995-1999
Project Manager

Monitored and assured project performance against budget, schedules,


quality and safety requirements, using appropriate control tools and reporting
of same to the company’s management and clients.

Planning, control, monitoring, management meetings to advance work,


personnel management, quality management system, safety and progress
reports and financial work.
Managed Construction projects.

Prepared cost lead-time and downtime estimates for assigned projects and
cost studies.

Prepared specifications and oversaw the preparation of all required drawings.

Administered the implementation of maintenance and operator training for all


new equipment and systems installed.
Utilized the engineering tools available to create bills of material and prepared
general arrangement drawings, piping isometrics and detail fabrication
drawings.

Acted as interface between end-users, contractors, suppliers, filling station


project manager and others engineering project staff.
Studied claims and variations of consultants and contractors in coordination
with project support officer.
Certified progress invoices before any payment.
Followed up and monitors the continuous progress of works at sites to ensure
implementation of project plans and schedules, technical compliances with
specifications and users requirements.

Had the responsibility and accountability of the successful execution of


projects in terms of quality at work, codes and laws, health, safety,
maintenance of schedule, budget and profit margins, as well as client’s
relations, satisfaction from commencement to hand over and close up.
Followed up and monitored the continuous progress of works at sites to
ensure implementation of project plans and schedules, technical compliances
with specifications and users requirements.

Relevant Projects:

Constuction for BP, La phinta fase two Pedernales, Onshore. Offshore-


Venezuela
Pipe line, Platform, Vessels, interconnections, piles, bridges, Line Barge,
installation, commissioning, hand over
Construction Facilities ULE for SHELL, Tia Juana, Onshore- Venezuela
Pipe line, Electrical Substation, Vessels, Flare, interconnections, installations,
commissioning, hand over.

Página 2 de 4
1986-1995
COMPANY:Constructora Merida. COMECA

Resident Engineer

Monitored and assured project performance against budget, schedules,


quality and safety requirements, using appropriate control tools and reporting
of same to the company’s management and clients.
Planning, control, monitoring, management meetings to advance work,
personnel management, quality management system, safety and progress
reports and financial work.
Managed multiple projects of varying priorities at the same time.
Prepared cost lead-time and downtime estimates for assigned projects and
cost studies.
Prepared specifications and oversaw the preparation of all required
drawings.
Administered the implementation of maintenance and operator training for all
new equipment and systems installed.
Utilized the engineering tools available to create bills of material and
prepared general arrangement drawings, piping isometrics and detail
fabrication drawings.

Relevant Projects:
Construction El Vigia Airport.

Página 3 de 4
ACADEMIC INFORMATION

INSTITUTE
PERIOD
Post- PreGrado's studies: University Rafael 1986
degree: Urdaneta.URU Maracaibo,
Pre- Venezuela.
degree: Civil Engineer
Obtained Colegio Gonzaga
title: Colegio Gonzaga

COURSES INSTITUTE DATE

Gerencia para Ingenieros. IGEZ

Taller sobre construcción


y montaje de plataformas
en alta mar.

LENGUAGES
SPEAK READ
WRITE

SPANISH WELL WELL WELL


_________________ _____ _____ _______
ENGLISH REGULAR WELL WELL
_________________ _____ _____ _______

SKILLS

Management and Administration of Consultancy Companies


Project Management
Development of Engineering Software and Project Control
Preventive and Corrective Maintenance Planning and Control
Quality Management
Field Engineer.

Página 4 de 4