Anda di halaman 1dari 36

Gen 4_i

PLTN Merah Putih

Geni Rina Sunaryo


Webinar HIMNI, 15 Oktober 2020
Batan - LPNK

1. Technology Provider (TP)


2. Technical Support
Organization (TSO)
3. Clearing House (CH)

Harus jadi PEMAIN


bukan
PENGIKUT !!!

29/11/2018
GOAL
Technology
Provider

SDM RDE → PeLUIt


Unggul Banyak teman SMR
STAKE HOLDER
dan diterima

RUJUKAN
Internasional
Strategi

TP, TSO, CH

SDM Indonesia
yang laku JUAL
Strategi
SDM Indonesia yang laku Jual

Tantangan PRODUK yg laku Jual

Desain

Software Simulator

29/11/2018
Gen 4_i RDE?

Skema Umum Reaktor Daya Eksperimental (RDE)


6
PeLUIt

RDE
(10 MWt)

Joint Lab. PTKRN-BATAN & INET, 21-23 November 2018, BALI 7


Respon terhadap panas sisa RDE
1000

950

900
Temperature [⁰C]

850 Mengapa???
800

750

700

650

600
0 10 20 30 40 50 60 70 80 90 100
Time [hours]
8
Kemas Bahan Bakarnya BEDA !!!
PLTN tipe pendingin air RDE/Micro-PeLUIt
SUPER AMAN !!

<1mm
EVOLUSI PLTN Generation IV
RDE/Micro-PeLUIt masuk Gen-IV
Generation III+

PLTN INDONESIA ?
Generation III
Generation II
Generation I

Fukushima
Apa itu PLTN?
Chernobyl

Gen I Gen II Gen III


KELEBIHAN RDE/Micro-PeLUIt
❑ Tujuan GANDA, Listrik dan Uap untuk proses Industri
❑ Generasi IV, paling aman
❑ Nyaris TIDAK DIBUTUHKAN prosedur EVAKUASI
❑ RDE – PLTN adalah Energi bersih, karena emisi karbonnya rendah.
❑ Tipe PLTN RDE, Sebentar lagi masuk dalam PLTN PROVEN, merujuk
pada HTR-PM China 2021 Operasi
❑ Masuk Micro PLTN, cocok untuk lokasi yg dibangun SMELTER, dan
atau proses industri yang butuh uap panas tinggi
PLTU

PLTN
(PWR)

Pressurized Water Reactor (PWR)


PLTU

PLTN
(PWR)

Pressurized Water Reactor (PWR)


PLTU

PLTN
(BWR)

Boiling Water Reactor (BWR)


PLTU

PLTN
(RDE/
Micro-PeLUITs)

RDE/Micro-PeLUIT)
Strategi

RDE 10 MWt PeLUIT 150 PLTN Merah


MWt Putih
(Flagship, DIPA,
IAEA) (Joint Lab) Modular

29/11/2018
PeLUIT 150
RDE 10 MWt MWt
PLTN Merah
Putih
(Flagship, DIPA, (Flagship, DIPA,
IAEA) Modular
Joint Lab)

• Desain
• Simulator
• Peta manufaktur
• Regulasi
Simulator
• Real Time
• Data Look up
• Classroom type
• Semi Fullscale
• Fullscale

Design Terlisensi (?)


• Conceptual Design (RENUKO)
• Basic Engineering Design
• Detail Engineering Design, to be licensed
by BAPETEN
Software
• TRIAC Batan
• APA Batan

19
20
❑ Di lepas September 2020
❑ 354 Halaman
Conceptual Basic
Design Design

2015 by
RENUKO
Consortium as Vendor
Consultant (2019-2022)
NU: NUKEM
(owned by
ROSATOM)
(2015)

Establish a national collaborations on HTGR including


national lab., universities, and engineering
companies.
Launching Dokumen Detail Engineering Design RDE, Jum’at 16 Nopember
2018 Gedung 80, PUSPIPTEK, Serpong

27
Step Perijinan
Site Licensing Operational
DONE Permit
1 2 3 4 5
Design Approval Commissioning
1. Detail Design Permit
2. Safety Analysis Report

Construction Permit Initial draft


Docs: already prepared
1. Safety Analysis Report 7. Ageing Management Doc by BATAN in
2. LCO Document 8. Decommissioning Program 2016.
3. Management System Document 9. Emergency Preparedness Program
4. Radiation Protection and Safety Doc. 10. Construction Program SAR and Conc. &
5. System Safeguard Doc 11. Environmental Impact License
Basic Design
6. Physical Protection Plan Doc
reviewed by IAEA
in 2016 2017
2018
Conceptual Basic
Design Design
Vol. 1 :
2015 by Process Design
RENUKO
Consortium as Vendor
Consultant (2019-2022)
NU: NUKEM
(owned by
ROSATOM)
(2015)

PeLUIt Road Map


dan PeLUIt PERDANA 150 MWt
Procure. & Construction of RDE
R&D, HRD, and Promotion Center of PeLUIt
Detail Engineering
Design of RDE
(Development & PeLUIt PERDANA
External Review) Constructed

2022

2018 2019 2025


Nominal
Eng. Design
Construction Contract
of PeLUIt
of PeLUIt PERDANA
PERDANA

Design, Construction, Manufacture, Promotion of PeLUIt


Sbg Model PLTN Indonesia

Small Unit
Electricity Demand

31
Reactor auxiliary building Reactor building Reactor building annex

Helium storage Turbine building

Spent fuel element Transformer

storage

Gate house

Office and staff Central control


building (Switchgear)
building

29/11/2018
Site licensing received for 5 years

Konsep Desain oleh RENUKO

Basic Engineering Design (BED) oleh tim Batan

Detail Engineering Design (DED) oleh tim Batan

DED sudah di review BAPETEN


2018 mulai desain FIRST PeLUIt (Perdana) 150
MW Indonesia
RDE – ARIS IAEA 2020

33
NILAI POSITIF mendesain rde
1. Telah mengajak Regulator-BAPETEN, Bersama - mempunyai
pengalaman dalam bagaimana mengusulkan dan memberikan Ijin
Tapak
2. Desain Konsep, mempunyai PATEN dan bbrp usulan PATEN terkait RDE
3. Detail Desain – taraf diskusi dengan BAPETEN (Regulasi BAPETEN
terkait PLTN sudah ada (5 step Lisensi)
4. Kerma Internasional : JOIN LAB dengan Tsinghua University 2018-
2020. Lanjut? Kerma dg IAEA
5. Kerma dengan Universitas dalam negeri, BUMN
6. Telah mengajak SDM Regulator – BAPETEN, untuk Bersama
memahami teknologi RDE
Kesimpulan CIPTA SDM UNGGUL
• RDE/Micro-PeLUIt terbukti menCETAK SDM yang Unggul
• Originalitas RDE Diakui Internasional – booklet ARIS IAEA
• Originalitas RDE mendorong kuantitas Tulisan Ilmiah di
Publikasi bereputasi Internasional
• SINTA index SDM meningkat pesat
• Pecah telur untuk Indonesia sbg Technology Provider
• Pentingnya bekerja dalam TIM KERJA
Kesimpulan CIPTA SDM UNGGUL

• PROJECT RDE, seyogyanya dilanjutkan hingga terbangun.


• SDM UNGGUL terkait Reaktor NUKLIR akan BISA menjadi SDM
RUJUKAN Internasional
• Karena, menjadi SDM yang bisa tidak hanya meng evaluasi desain
orang lain, tapi juga BISA CIPTA DESAIN.
• BISA CIPTA DESAIN sendiri pun akan menjadi EVALUATOR yang jauh
lebih dipercaya
• Penerimaan Masyarakat terhadap PLTN akan meningkat