PERBEDAAN ELEVASI
PROYEK TRANSMART TASIKMALAYA
3 DPT Utara (area warga) - H = 3.0 m m' 1,352,681.25 - 273.00 1,352,681.25 369,281,981.25 1,352,681.25 - - 1,352,681.25 - 175.00 1,352,681.25 236,719,218.75 - 369,281,981.25 - - 236,719,218.75
DPT Utara (area warga) - H = 2.5 m m' 960,552.00 - 960,552.00 - 80.00 960,552.00 76,844,160.00 80.00 960,552.00 76,844,160.00 960,552.00 - - - 76,844,160.00 76,844,160.00 -
DPT Utara (area warga) - H = 2.0 m m' 204.00 637,157.75 129,980,181.00 637,157.75 - 637,157.75 - 637,157.75 - 637,157.75 - 129,980,181.00 - - - -
DPT Utara (area warga) - H = 1.5 m m' 328,885.20 - 83.00 328,885.20 27,297,471.60 128.00 328,885.20 42,097,305.60 128.00 328,885.20 42,097,305.60 181.00 328,885.20 59,528,221.20 - 27,297,471.60 42,097,305.60 42,097,305.60 59,528,221.20
DPT Utara (area warga) - H = 1.0 m m' 76.00 169,767.60 12,902,337.60 169,767.60 - 98.00 169,767.60 16,637,224.80 98.00 169,767.60 16,637,224.80 169,767.60 - 12,902,337.60 - 16,637,224.80 16,637,224.80 -
DPT Utara (area warga) - H = 0.5 m m' 93,132.00 - 93,132.00 - 93,132.00 - 93,132.00 - 93,132.00 - - - - - -
DPT Selatan (jalan kawasan) - H = 3.0 m m' 1,352,681.25 - 1,352,681.25 - 1,352,681.25 - 48.00 1,352,681.25 64,928,700.00 103.00 1,352,681.25 139,326,168.75 - - - 64,928,700.00 139,326,168.75
DPT Selatan (jalan kawasan) - H = 2.5 m m' 960,552.00 - 960,552.00 - 48.00 960,552.00 46,106,496.00 91.00 960,552.00 87,410,232.00 960,552.00 - - - 46,106,496.00 87,410,232.00 -
DPT Selatan (jalan kawasan) - H = 2.0 m m' 637,157.75 - 103.00 637,157.75 65,627,248.25 55.00 637,157.75 35,043,676.25 637,157.75 - 637,157.75 - - 65,627,248.25 35,043,676.25 - -
DPT Selatan (jalan kawasan) - H = 1.5 m m' 55.00 328,885.20 18,088,686.00 155.00 328,885.20 50,977,206.00 36.00 328,885.20 11,839,867.20 43.00 328,885.20 14,142,063.60 36.00 328,885.20 11,839,867.20 18,088,686.00 50,977,206.00 11,839,867.20 14,142,063.60 11,839,867.20
DPT Selatan (jalan kawasan) - H = 1.0 m m' 169,767.60 - 169,767.60 - 169,767.60 - 169,767.60 - 43.00 169,767.60 7,300,006.80 - - - - 7,300,006.80
DPT Selatan (jalan kawasan) - H = 0.5 m m' 93,132.00 - 93,132.00 - 43.00 93,132.00 4,004,676.00 93,132.00 - 93,132.00 - - - 4,004,676.00 - -
DPT Barat (Area Depan) - H = 3.0 m m' - 1,352,681.25 - 1,352,681.25 - 1,352,681.25 - 1,352,681.25 - 1,352,681.25 - - - - - -
DPT Barat (Area Depan) - H = 2.5 m m' - 960,552.00 - 960,552.00 - 960,552.00 - 960,552.00 - 960,552.00 - - - - - -
DPT Barat (Area Depan) - H = 2.0 m m' - 637,157.75 - 120.00 637,157.75 76,458,930.00 637,157.75 - 637,157.75 - 120.00 637,157.75 76,458,930.00 - 76,458,930.00 - - 76,458,930.00
DPT Barat (Area Depan) - H = 1.5 m m' - 328,885.20 - 328,885.20 - 328,885.20 - 328,885.20 - 328,885.20 - - - - - -
DPT Barat (Area Depan) - H = 1.0 m m' - 169,767.60 - 169,767.60 - 120.00 169,767.60 20,372,112.00 120.00 169,767.60 20,372,112.00 169,767.60 - - - 20,372,112.00 20,372,112.00 -
DPT Barat (Area Depan) - H = 0.5 m m' - 93,132.00 - 93,132.00 - 93,132.00 - 93,132.00 - 93,132.00 - - - - - -
DPT Timur (Area Belakang) - H = 3.0 m m' 1,352,681.25 - 1,352,681.25 - 1,352,681.25 - 1,352,681.25 - 1,352,681.25 - - - - - -
DPT Timur (Area Belakang) - H = 2.5 m m' 146.00 960,552.00 140,240,592.00 960,552.00 - 960,552.00 - 960,552.00 - 67.00 960,552.00 64,356,984.00 140,240,592.00 - - - 64,356,984.00
DPT Timur (Area Belakang) - H = 2.0 m m' 637,157.75 - 146.00 637,157.75 93,025,031.50 637,157.75 - 637,157.75 - 637,157.75 - - 93,025,031.50 - - -
DPT Timur (Area Belakang) - H = 1.5 m m' 35.00 328,885.20 11,510,982.00 328,885.20 - 146.00 328,885.20 48,017,239.20 146.00 328,885.20 48,017,239.20 146.00 328,885.20 48,017,239.20 11,510,982.00 - 48,017,239.20 48,017,239.20 48,017,239.20
DPT Timur (Area Belakang) - H = 1.0 m m' 169,767.60 - 169,767.60 - 169,767.60 - 169,767.60 - 169,767.60 - - - - - -
DPT Timur (Area Belakang) - H = 0.5 m m' 93,132.00 - 93,132.00 - 93,132.00 - 93,132.00 - 93,132.00 - - - - - -
516.00 312,722,778.60 880.00 682,667,868.60 754.00 300,962,757.05 754.00 370,449,037.20 871.00 643,546,635.90 312,722,778.60 682,667,868.60 300,962,757.05 370,449,037.20 643,546,635.90
4 Pagar Panel h = 2m Sisi Utara (warga) m' 280.00 696,289.85 194,961,158.00 273.00 696,289.85 190,087,129.05 223.00 696,289.85 155,272,636.55 223.00 696,289.85 155,272,636.55 273.00 696,289.85 190,087,129.05 406.00 550,000.00 223,300,000.00 (33,212,870.95) (68,027,363.45) (68,027,363.45) (68,027,363.45) (33,212,870.95) Precast Perimeter
6 Saluran Air (RCP dia.60) m' 255.50 791,400.00 202,202,700.00 255.50 791,400.00 202,202,700.00 255.50 791,400.00 202,202,700.00 255.50 791,400.00 202,202,700.00 255.50 791,400.00 202,202,700.00 288.00 708,150.00 203,947,200.00 (1,744,500.00) (1,744,500.00) (1,744,500.00) (1,744,500.00) (1,744,500.00)
TOTAL 2,886,144,236.60 3,597,523,797.65 1,865,132,093.60 1,989,698,623.75 2,318,482,464.95 1,268,669,007.65 1,662,200,105.15 30,134,893.60 154,701,423.75 483,485,264.95
Over Over Over Over Over