Anda di halaman 1dari 417

LAPORAN KEGIATAN HARIAN MAINTENANCE OUTAGE

PEMELIHARAAN INSTRUMEN DAN KONTROL UNIT BOP


PT. INDONESIA POWER UJP PLTU JATENG 2 ADIPALA

LOKASI KERJA : PLTU ADIPALA


CUACA : CERAH

NO. URAIAN KEGIATAN


1
2
3
4
5
6
7
8
MANPOWER
Project Leader IC : I Gede Sukma SR
Pengawas Lap. IC : Andika Respati Firdaus
Teknisi : Ahmad syifaul, Adhana Tito, Sugiyono, Heriyanto, Feri, Imam
Asisten Teknisi : Adit, Endra, Harris, Aji, Ade
Rendal Har IC : Prawira Sakti
Admin Har IC : Anisa Apriliawati

DETAIL PEKERJAAN DAN PERSENTA

NO. URAIAN KEGIATAN


ADP19/20774 4DX KONTROL INSTRUMEN AREA IGNITER OF BURNER LEVEL D

ADP19/20775 4DX KONTROL INSTRUMEN AREA PLC WWTP
2

NO. PEKERJAAN/TEMUAN FEEDBACK

- Problem :
- Actual Action :
1 4dx plc wwtp - Hasil Akhir :
- Summary :
- Problem :
2 4Dx iginter burner level D - Actual Action :
- Hasil Akhir :
- Summary :

Mengetahui,
Pemasangan temperatur RTD - Penyebab :
3 bearing roller Mill C - Actual Action :
- Hasil Akhir :
- Summary :

I Gede Sukma S.R


Project Leader I & C
NANCE OUTAGE
TROL UNIT BOP
ENG 2 ADIPALA

TANGGAL : Minggu /01 September 2019


HARI ke- : 01

GIATAN

MANPOWER

EKERJAAN DAN PERSENTASE PROGRESS


(%)
WO STATUS
PROGRESS

S 100% CLOSE

S 100% CLOSE
Dilaporkan Oleh,

Andika Respati . F
Pengawas Lapangan I & C
WORK TYPE

EKSEKUTOR

Adhana Tito, Moh. Imam, Haris

Adhana Tito, Moh. Imam, Haris


LAPORAN KEGIATAN HARIAN MAINTENANCE OUTAGE
PEMELIHARAAN INSTRUMEN DAN KONTROL UNIT BOP
PT. INDONESIA POWER UJP PLTU JATENG 2 ADIPALA

LOKASI KERJA : PLTU ADIPALA


CUACA : CERAH

NO. URAIAN KEGIATAN


1
2
3
4
5
6
7
8
MANPOWER
Project Leader IC : I Gede Sukma SR
Pengawas Lap. IC : Andika Respati Firdaus
Teknisi : Ahmad syifaul, Adhana Tito, Sugiyono, Heriyanto, Feri, Imam
Asisten Teknisi : Adit, Endra, Harris, Aji, Ade
Rendal Har IC : Prawira Sakti
Admin Har IC : Anisa Apriliawati

DETAIL PEKERJAAN DAN PERSENTA

NO. URAIAN KEGIATAN


ADP19/20788 4DX KONTROL INSTRUMEN AREA TURBINE ELECTRONIC ROOM

ADP19/20791 4DX KONTROL INSTRUMEN AREA PEDESTAL TURBINE, BFPT A & B, EH OIL
2

ADP19/20795 4DX KONTROL INSTRUMEN AREA COAL FEEDER D
3
ADP19/20800 4DX KONTROL INSTRUMEN AREA MILL D
4

ADP19/20806 4DX KONTROL INSTRUMEN AREA PLC COALY
5
ADP19/20808 4DX KONTROL INSTRUMEN AREA PLC DAN PC AUXBOL
6

ADP19/20507 PEMELIHARAAN RUTIN INSTRUMEN 1ST STAGE CARTRIDGE FILTER A  (4 MINGGU
AN)
7

ADP19/20509 PEMELIHARAAN RUTIN INSTRUMEN 1ST STAGE CARTRIDGE FILTER B  (4 MINGGU
AN)
8

ADP19/20544 PEMELIHARAAN RUTIN INSTRUMEN 2ND STAGE CATRIDGE FILTER A  (4 MINGGUA
N)
9

ADP19/20545 PEMELIHARAAN RUTIN INSTRUMEN 2ND STAGE CATRIDGE FILTER B  (4 MINGGUA
N)
10

ADP19/20546 PEMELIHARAAN RUTIN INSTRUMEN CONTINUOUS EMISSIONS MONITORING SYST
EM (CEMS)  (4 MINGGUAN)
11

ADP19/20547 PEMELIHARAAN RUTIN INSTRUMEN DCS UNIT 1 (4 MINGGUAN)
12

ADP19/20548 PEMELIHARAAN RUTIN INSTRUMEN BOILER CIRCULATING PUMP  (4 MINGGUAN)
13

ADP19/20552 PEMELIHARAAN RUTIN INSTRUMEN WALL SOOT BLOWER LEVEL A  (4 MINGGUAN
)
14

ADP19/20553 PEMELIHARAAN RUTIN INSTRUMEN WALL SOOT BLOWER LEVEL B  (4 MINGGUAN
)
15

ADP19/20554 PEMELIHARAAN RUTIN INSTRUMEN WALL SOOT BLOWER LEVEL C  (4 MINGGUAN
)
16

ADP19/20555 PEMELIHARAAN RUTIN INSTRUMEN WALL SOOT BLOWER LEVEL D  (4 MINGGUAN
)
17

ADP19/20556 PEMELIHARAAN RUTIN INSTRUMEN CONDENSATE EXTRACTION PUMP A (CEP A)  
(4 MINGGUAN)
18

ADP19/20557 PEMELIHARAAN RUTIN INSTRUMEN CONDENSATE EXTRACTION PUMP B (CEP B)  
(4 MINGGUAN)
19
ADP19/21294 (CE) MOV Auxiliary Steam To Pulverizer tidak bisa Close (Travel)
20

ADP19/21295 (BOP_C) Valve Cooling Water H2 Plant Unit #1 Tidak Dapat Auto Open
21

ADP19/21297 CE (BOP) -  AC ruang VFD SWRO sisi barat tidak dingin
22

ADP19/19937 (AC) SERVICE RUTIN  AC STANDING FLOOR AREA BOILER MCC
23

ADP19/19939 (AC) SERVICE RUTIN AC STANDING FLOOR AREA EXITATION CUBICLE ROOM / EXIT
ATION ROOM / AVR ROOM TURBIN
24

NO. PEKERJAAN/TEMUAN FEEDBACK

- Problem :
- Actual Action : Hasil pengecekan PLC coaly waste water
. Power supply 228 VAC dan supply output 24 VDC
. Alarm modul plc tidak ada
. Fan panel normal
1 4DX plc coaly . Ac ruangan mati
. Ups rusak
. Modul komunikasi normal
. Temuan banyak kabel di panel plc bocor
- Hasil Akhir :
- Summary :

- Problem :
2 4dx plc auxbol dan cleaning - Actual Action :
peralatan area auxbol - Hasil Akhir :
- Summary :

- Penyebab :
3 PM CEP. A&B - Actual Action :
- Hasil Akhir :
- Summary :
- Problem :
PM wall sootblower - Penyebab :
PM wall sootblower level A, B, C, - Actual Action :
D - Hasil Akhir :
- Summary :

- Problem :
- Penyebab :
PM pedestal EH BFPT A dn B - Actual Action :
- Hasil Akhir :
- Summary :

- Problem :
- Penyebab :
Pm pedestal turbine - Actual Action :
- Hasil Akhir :
- Summary :

- Problem :
PM DCS turbine electronic room - Penyebab :
- Actual Action :
- Summary :

- Problem :
4DX Mill D - Penyebab :
- Actual Action :
- Summary :

- Problem :
- Penyebab :
4DX COAL FEEDER D - Actual Action :
- Hasil Akhir :
- Summary :
- Problem :
- Penyebab :
Pm 1st stage ro hpp a dan b - Actual Action :
- Hasil Akhir :
- Summary :

- Problem :
- Penyebab :
Pm 2nd stage ro hpp a dan b - Actual Action :
- Hasil Akhir :
- Summary :

- Problem :
- Penyebab :
PM BCP - Actual Action :
- Hasil Akhir :
- Summary :

Lnjut pengecekan mov otl elektrik


filter B. (POD MM no. 1) valve
aktual berat saat diengkol dan - Problem :
saat close lokal muncul suara
- Penyebab :
berdecit/ ad gesekan mekanis di - Actual Action : Secara instrumen normal msh bisa d command
bagian shaft saat inj open di 46an - Hasil Akhir :
% . Khawatir bila. D full close
paksa bisa merudak komponen - Summary :
gear. Perlu dilakukan cek sisi
meknais

Pengecekan MOV bypass electrik


filter yg indikasi fault. Sudh d - Problem :
xoba reset ttp alarm. - Penyebab :
Kemungkinan perlu setting tp - Actual Action :
blm bisa karena ad flow aliran air - Hasil Akhir :
jika open blm diperbolehkn - Summary :
operator

- Problem :
- Penyebab :
PM CEMS - Actual Action :
- Hasil Akhir :
- Summary :

- Problem :
- Penyebab :
Akses air cannon CF F - Actual Action :
- Hasil Akhir :
- Summary :
- Problem :
- Penyebab :
Akses ke outlet dumper mill - Actual Action :
- Hasil Akhir :
- Summary :

- Problem :
Konektor lama sudah pecah - Penyebab :
- Actual Action : Sudah diganti dengan konektor 16mm.. Stok digudang tinggal 3 buah
- Summary :

- Problem :
Pengecekan control valve cooling - Penyebab :
water h2 unit 1 - Actual Action :
- Hasil Akhir :
- Summary :

- Problem :
- Penyebab :
Cek patrol boiler elektrik room - Actual Action :
- Hasil Akhir :
- Summary :

Mengetahui,

I Gede Sukma S.R


Project Leader I & C
NANCE OUTAGE
TROL UNIT BOP
ENG 2 ADIPALA

TANGGAL : Senin /02 September 2019


HARI ke- : 02

GIATAN

MANPOWER

EKERJAAN DAN PERSENTASE PROGRESS


(%)
WO STATUS
PROGRESS

S 100% close

S 100% close

S 100% close

S 100% close

S 100% close
S 100% close

PM 100% close

PM 100% close

PM 100% close

PM 100% close

PM 100% close

PM 100% close

PM 100% close

PM 100% close

PM 100% close

PM 100% close

PM 100% close

PM 100% close

PM 100% close
CD 100% close

CD 100% close

CD 100% close

S 100% close

S 100% close
ang tinggal 3 buah

Dilaporkan Oleh,

Andika Respati . F
Pengawas Lapangan I & C
WORK TYPE

EKSEKUTOR

Tito, Haris

Tito, Haris

Heriyanto, Adit

Sugiyono, Aji

Feri, Imam, Endra, Ade


Feri, Imam, Endra, Ade

Feri, Imam, Endra, Ade

Feri, Imam, Endra, Ade

Feri, Imam, Endra, Ade

Feri, Imam, Endra, Ade

Tito, Haris

Tito, Haris

Heriyanto, Adit

Sugiyono, Aji

Sugiyono, Aji

Sugiyono, Aji

Sugiyono, Aji

Heriyanto, Adit

Heriyanto, Adit
Tito, Haris
LAPORAN KEGIATAN HARIAN MAINTENANCE OUTAGE
PEMELIHARAAN INSTRUMEN DAN KONTROL UNIT BOP
PT. INDONESIA POWER UJP PLTU JATENG 2 ADIPALA

LOKASI KERJA : PLTU ADIPALA


CUACA : CERAH

NO. URAIAN KEGIATAN


1
2
3
4
5
6
7
8
MANPOWER
Project Leader IC : I Gede Sukma SR
Pengawas Lap. IC : Andika Respati Firdaus
Teknisi : Ahmad syifaul, Adhana Tito, Sugiyono, Heriyanto, Feri, Imam
Asisten Teknisi : Adit, Endra, Harris, Aji, Ade
Rendal Har IC : Prawira Sakti
Admin Har IC : Anisa Apriliawati

DETAIL PEKERJAAN DAN PERSENTA

NO. URAIAN KEGIATAN


ADP19/20834 4DX KONTROL INSTRUMEN AREA IDF A

ADP19/20844 4DX KONTROL INSTRUMEN AREA IDF B
2

ADP19/20847 4DX KONTROL INSTRUMEN AREA COAL FEEDER A
3
ADP19/20858 4DX KONTROL INSTRUMEN AREA MILL A
4

ADP19/20862 4DX KONTROL INSTRUMEN AREA DCS CHLORIN
5
ADP19/20863 4DX KONTROL INSTRUMEN AREA DCS OIL PUMP HOUSE
6

ADP19/20558 PEMELIHARAAN RUTIN INSTRUMEN 1ST STAGE SWRO MODULE A  (4 MINGGUAN
)
7

ADP19/20559 PEMELIHARAAN RUTIN INSTRUMEN 1ST STAGE SWRO MODULE B  (4 MINGGUAN
)
8

ADP19/20560 PEMELIHARAAN RUTIN INSTRUMEN 2ND STAGE BWRO MODULE A  (4 MINGGUA
N)
9

ADP19/20561 PEMELIHARAAN RUTIN INSTRUMEN 2ND STAGE BWRO MODULE B  (4 MINGGUA
N)
10

ADP19/20562 PEMELIHARAAN RUTIN INSTRUMEN LP HEATER 1A (LPH 1A)  (4 MINGGUAN)
11

ADP19/20563 PEMELIHARAAN RUTIN INSTRUMEN LP HEATER 1B (LPH 1B)  (4 MINGGUAN)
12

ADP19/20564 PEMELIHARAAN RUTIN INSTRUMEN LP HEATER 2A (LPH 2A)  (4 MINGGUAN)
13

ADP19/20565 PEMELIHARAAN RUTIN INSTRUMEN LP HEATER 2B (LPH 2B)  (4 MINGGUAN)
14

ADP19/20566 PEMELIHARAAN RUTIN INSTRUMEN HEAT EXCHANGER A CLOSE COOLING CIRCUL
ATING WATER SYSTEM  (4 MINGGUAN)
15

ADP19/20567 PEMELIHARAAN RUTIN INSTRUMEN HEAT EXCHANGER B CLOSE COOLING CIRCUL
ATING WATER SYSTEM  (4 MINGGUAN)
16

ADP19/20417 (AC) SERVICE RUTIN  AC STANDING FLOOR AREA EMERGENCY SWITCH GEAR ROO
M / ESSENTIAL BOARD POWER DISTRIBUTION (PDC)
17

ADP19/20418 (AC) SERVICE RUTIN AC STANDING FLOOR AREA 400 V SWITCH GEAR ROOM / STA
TION SERVICE PDC POWER DISTRIBUTION
18

ADP19/21396 Electric Filter B Outlet MOV Fault
19
ADP19/21397 CE Debris Filter B DP Tubing Transmitter sisi out bocor pada konektornya
20

ADP19/21293 (BOP) - Terdapat alarm pada display silika analizer sampling rack
21

NO. PEKERJAAN/TEMUAN FEEDBACK

- Problem :
- Actual Action : Hasil pengecekan DCS oil pump house
1. tidak di temukan error pada setiap modul
2. Tegangan dari UPS = 218 AC
1 4DX DCS OIL PUMP HOUSE 3. Tegangan dari supply = 229 AC
4. Tegangan output rectifier masing2 = 23. 9V DC
5. AC hidup dan temperatur 22 'C
6. Fan panel normal
- Hasil Akhir :
- Summary :

- Problem :
2 4DX mill A - Actual Action :
- Hasil Akhir :
- Summary :

- Penyebab :
3 4DX CF A - Actual Action :
- Hasil Akhir :
- Summary :

- Problem :
- Penyebab :
4dx DCS cHlorine - Actual Action :
- Hasil Akhir :
- Summary :
Pengecekan motor HYD CWP B
tidak bisa start padahal press - Problem : Kabel LS putus 1 pas di buka yang sisi H (sudah di oasang) tapi blm mau releas switn
udah L, (9.4). Di lakukan check lakukan sentuh bourdone tube dan switch nya, kedepan pas 4dx akan d lumasi dengan oil.
limit switch unk sisi L NORMAL - Penyebab :
bekerja, untuk sisi H untuk auto - Actual Action : Skrg pressure sudah normal
stop pompa, switch bekerja - Hasil Akhir :
padahal pressure sudah di 9.4 - Summary :
mpa ..

- Problem :
- Penyebab :
Penwgecekan alarm silica flow 1 - Actual Action :D lakukan tes solenoid poma2, set flow di 25t/h, coba start dalam 2 kali pengh
tidak mncul
missing Selanjutnya akan d monitoring oleh opr kimia
- Hasil Akhir :
- Summary :

- Problem :
Pengetesan daper idf dan fdf - Penyebab :
auxbol. - Actual Action :
- Summary :

- Problem :
- Penyebab :
PM LPH 1,2 A dan B - Actual Action :
- Summary :

- Problem :
- Penyebab :
PM HE - Actual Action :
- Hasil Akhir :
- Summary :

- Problem :
- Penyebab :
- Actual Action : Pengecekan MCB trip : 1.Pastikan force2an aman 2.Power on MCB boiler elek
Lanjut pengecekan mcb trip outlet On MCB lokal , jika lngsung trip . Cek cek urut kabel dng melepas satu persatu beban, mulai me
damper mill A samhungan sisi kabel fasa yg menuju ke beban , kabel limit switch dan selanjutnya normal nila
normal, cek kabel coil selonoid ditemukan penyebab short dr supply 220VAC coil selonoid. Sem
1-6 dilepas . Di coba on MCB sudh tdk trip sambil di monitor
- Hasil Akhir : Msh kondisi d force
- Summary :

Mengetahui,

I Gede Sukma S.R


Mengetahui,

I Gede Sukma S.R


Project Leader I & C
NANCE OUTAGE
TROL UNIT BOP
ENG 2 ADIPALA

TANGGAL : Selasa /03 September 2019


HARI ke- : 03

GIATAN

MANPOWER

EKERJAAN DAN PERSENTASE PROGRESS


(%)
WO STATUS
PROGRESS

S 100% close

S 100% close

S 100% close

S 100% close

S 100% close
S 100% close

PM 100% close

PM 100% close

PM 100% close

PM 100% close

PM 100% close

PM 100% close

PM 100% close

PM 100% close

PM 100% close

PM 100% close

S 100% close

S 100% close

CD 50% open
CD 100% close

CD 100% close
) tapi blm mau releas switnya, ahirnya d
n d lumasi dengan oil.

ba start dalam 2 kali penghitungan alarm

.Power on MCB boiler elektronik 3. Power


u persatu beban, mulai mencoba dr
dan selanjutnya normal nilai resistansi
y 220VAC coil selonoid. Sementra sisi open

Dilaporkan Oleh,

Andika Respati . F
Dilaporkan Oleh,

Andika Respati . F
Pengawas Lapangan I & C
WORK TYPE

EKSEKUTOR

Tito, Haris

Tito, Haris

Heriyanto, Haris

Sugiyono, Aji

Feri, Imam, Endra, Ade


Feri, Imam, Endra, Ade

Feri, Imam, Endra, Ade

Feri, Imam, Endra, Ade

Feri, Imam, Endra, Ade

Feri, Imam, Endra, Ade

Heriyanto, Haris

Heriyanto, Haris

Heriyanto, Haris

Heriyanto, Haris

Sugiyono, Aji

Sugiyono, Aji

Tito, Haris
Heriyanto, Haris

Feri, Imam, Endra, Ade


LAPORAN KEGIATAN HARIAN MAINTENANCE OUTAGE
PEMELIHARAAN INSTRUMEN DAN KONTROL UNIT BOP
PT. INDONESIA POWER UJP PLTU JATENG 2 ADIPALA

LOKASI KERJA : PLTU ADIPALA


CUACA : CERAH

NO. URAIAN KEGIATAN


1
2
3
4
5
6
7
8
MANPOWER
Project Leader IC : I Gede Sukma SR
Pengawas Lap. IC : Andika Respati Firdaus
Teknisi : Ahmad syifaul, Adhana Tito, Sugiyono, Heriyanto, Feri, Imam
Asisten Teknisi : Adit, Endra, Harris, Aji, Ade
Rendal Har IC : Prawira Sakti
Admin Har IC : Anisa Apriliawati

DETAIL PEKERJAAN DAN PERSENTA

NO. URAIAN KEGIATAN


ADP19/20868 4DX KONTROL INSTRUMEN AREA BOILER ELECTRONIC ROOM

ADP19/20869 4DX KONTROL INSTRUMEN AREA PAF A
2

ADP19/20870 4DX KONTROL INSTRUMEN AREA PAF B
3
ADP19/20871 4DX KONTROL INSTRUMEN AREA COAL FEEDER B
4

ADP19/20872 4DX KONTROL INSTRUMEN AREA MILL B
5
ADP19/20873 4DX KONTROL INSTRUMEN AREA DCS CPP
6

ADP19/20874 4DX KONTROL INSTRUMEN AREA PLC H2 PLANT
7

ADP19/20568 PEMELIHARAAN RUTIN INSTRUMEN ELECTRIC MOTOR DRIVEN FIRE PUMP (SAFET
Y) (4 MINGGUAN)
8

ADP19/20569 PEMELIHARAAN RUTIN INSTRUMEN TRAVELING SCREEN 1 (4 MINGGUAN)
9

ADP19/20570 PEMELIHARAAN RUTIN INSTRUMEN TRAVELING SCREEN 2 (4 MINGGUAN)
10

ADP19/20571 PEMELIHARAAN RUTIN INSTRUMEN TRAVELING SCREEN 3 (4 MINGGUAN)
11

ADP19/20572 PEMELIHARAAN RUTIN INSTRUMEN CLOSED CYCLE COOLING WATER SYSTEM  AR
EA  (4 MINGGUAN)
12

ADP19/20573 PEMELIHARAAN RUTIN INSTRUMENT VACCUM BREAK DAN AIR EXTRACTION CON
DENSER SYSTEM  (4 MINGGUAN)
13

ADP19/20574 PEMELIHARAN RUTIN INSTRUMEN CONDENSER VACUUM SYSTEM  (4 MINGGUAN
)
14

ADP19/20575 PEMELIHARAAN RUTIN INSTRUMEN TURBINE LUBE PURIFICATION SYSTEM  (4 MI
NGGUAN)
15

ADP19/20576 PEMELIHARAAN RUTIN INSTRUMEN TURBINE LUBE OIL SYSTEM  (4 MINGGUAN)
16

ADP19/20577 PEMELIHARAAN RUTIN INSTRUMEN TURBINE EH OIL SYSTEM  (4 MINGGUAN)
17

ADP19/20419 (AC) SERVICE RUTIN  AC STANDING FLOOR AREA BATTERY ROOM / BATTERY ROO
M UNIT
18

ADP19/20420 (AC) SERVICE RUTIN AC STANDING FLOOR AREA R OIL PUMP MCC
19
ADP19/20421 (AC) SERVICE RUTIN AC SPLIT AREA LAB BOMB KALORI
20

ADP19/21432 CE (UNIT) Muncul alarm firing APH A No. 4, Modul rusak karena display tidak mun
cul
21

NO. PEKERJAAN/TEMUAN FEEDBACK

- Problem :
- Actual Action :
1 PM elektrik driven firefighting - Hasil Akhir :
- Summary :

- Problem :
- Actual Action : Hasil pengecekan PLC dan PC H2 plant unit 1 dan 2
▪power supply 223 vac
2 4dx H2 plant ▪Fan panel normal
▪Untuk suhu ruangan 20'C
▪ PC dan modul PLC sementara normal tidak erorr
- Hasil Akhir :
- Summary :

Lanjut pengecekan outlet dumper - Penyebab :


3 mill A. Kabel no D:37/ZK-2 - Actual Action : Pengechekan Outlet Dumper Mill A
mengarah ke terminal no 37 - Hasil Akhir :
- Summary :

- Problem :
Terminal no 37 kabel untuk - Penyebab :
power limit switch indikasi open
close no 1 - 6. Setelah lepas satu - Actual Action : Sementara di lepas dan masih di pantau trip lagi gak MCB nya.
per satu beban ke limit swith dan Limit switc sisi open no 2 di lepas kabel nya. Indikasi di lokal lampu mati. Masih di pantau dan
untuk kabel limit switc no 2 sisi open.
di test di temukan kabel untuk - Hasil Akhir :
indikasi open gate no 2 - Summary :

- Problem : Alarm fault pada modul ETHERNET DCS CPP


Lampu link tdk kedap kedip (menandakan tidak aktif)
Alarm E Pada modul D6 dan D7 pada oanel CTRL 17/67 REAR
- Penyebab :
- Actual Action : Hasil pengecekan DCS CPP
1.alarm E pada modul CONTAC INPUT D6, D7 pada panel CTRL 17/67 REAR
4dx DCS CPP 2. Tegangan dari UPS = 225 V AC
3. Tegangan dari supply = 229 V AC
4. Tegangan output rectifier masing2 = 23,9 V DC
5. AC hidup dan temperatur 20'C
6. Fan Untuk panel DCS Normal
- Hasil Akhir : Ini untuk Spesifikasinya
- Summary :
- Problem :
Penggantian card A1, A2, A3 coal - Penyebab :
feeder C - Actual Action : Cleaning CF C Panel
- Hasil Akhir :
- Summary :

- Problem :
- Penyebab :
- Actual Action : Outlet LOP mill B
4DX mill B Parameter HOP mill B
Outlet cooler
- Summary :

- Problem :
Lanjut pengecekan silica analyzer - Penyebab :
sampling rack - Actual Action :
- Summary :

- Problem : Feedback: lampu panel coal feeder b mati


- Penyebab :
4DX COAL FEEDER B - Actual Action :
- Hasil Akhir :
- Summary :

- Problem :
- Penyebab :
PM EH oil sistem - Actual Action :Panel tidak ada leak oil dan panel kering.
- Hasil Akhir :
- Summary :

- Problem :
- Penyebab :
Kalibrasii coal feeder C - Actual Action :
- Hasil Akhir :
- Summary :
- Problem :
- Penyebab :
- Actual Action : .TBS A beroprasi
. Level in tbs: 7.85 m
. Level out tbs : 7.77 m
. Level in trashcar :7.78 m
. Posisi mov water spray tbs open 100%
. Limit switch jump buth di cek visual
. Limit switch chain draw d cek visual
2.TBS B running
. Level in tbs: 7.81m
. Level out tbs : 7.72 m
. Level in trashcar :7.75 m
. Posisi mov water spray tbs open 100%
Pm tbs abc . Limit switch jump buth secara visual normal
. Limit switch chain draw secara visual normal
3.TBS C stop
. Level in tbs: 7.92 m
. Level out tbs : 7.66 n
. Level in trashcar: 7.88 m
. Posisi mov water spray tbs open 0%
. Limit switch jump buth di test normal
. Limit switch chain draw di tes normal
Tambahan feedback
1.panel pengoprasian TBS sudah mulai berkaeat dan eapuh
2.kabel tray area TBS sudah rapuh...!!!
- Hasil Akhir :
- Summary :

4dx boiler electronic room.


cleaning filter dan fan , cek - Problem :
alarm . Tegangan power supplay - Penyebab :
in ~231VAC trgangan output - Actual Action :
23,89 VDC. Suhu ruangan normal - Hasil Akhir :
-+ 25degC . Alarm vib modul di - Summary :
PAF A

- Problem :
- Penyebab :
PM Lube oil turbin sistem - Actual Action :
- Hasil Akhir :
- Summary :

- Problem :
- Penyebab :
4DX PAF A - Actual Action :
- Hasil Akhir :
- Summary :
- Problem :
- Penyebab :
4DX IDF A - Actual Action :
- Hasil Akhir :
- Summary :

- Problem :
- Penyebab :
4DX IDF B - Actual Action :
- Hasil Akhir :
- Summary :

- Problem :
- Penyebab :
4DX PAF B - Actual Action :
- Hasil Akhir :
- Summary :

- Problem :
- Penyebab :
Pengecekan mov otl elektrik filter - Actual Action :
b bareng mekanik
- Hasil Akhir :
- Summary :

- Problem : Beban limit switc no 2 sisi open di lepas sampe sekarang MCB tidak trip.
Saat 40% close kebawah msh agak Beban yang ke solenoid comen close sudah terkonek semua.
seret. Dan timbul bunyi Beban ke solenoid comen open di konek semua kecuali no 2 solenoid coment open. Dan kabel lim
gwsekan ,Rencana mekanik akan open no 2 masih dilepas
- Penyebab :
regeease dan cek shaft worm
bearing - Actual Action :
- Hasil Akhir :
- Summary :

- Problem :
- Penyebab :
PM C3W SYSTEM - Actual Action :
- Hasil Akhir :
- Summary :
- Problem :
PM VACUM BREAK DAN AIR - Penyebab :
- Actual Action :
EXTRACTION SYSTEM - Hasil Akhir :
- Summary :

Mengetahui,

I Gede Sukma S.R


Project Leader I & C
NANCE OUTAGE
TROL UNIT BOP
ENG 2 ADIPALA

TANGGAL : Rabu /04 September 2019


HARI ke- : 04

GIATAN

MANPOWER

EKERJAAN DAN PERSENTASE PROGRESS


(%)
WO STATUS
PROGRESS

S 100% close

S 100% close

S 100% close

S 100% close

S 100% close
S 100% close

S 100% close

PM 100% close

PM 100% close

PM 100% close

PM 100% close

PM 100% close

PM 100% close

PM 100% close

PM 100% close

PM 100% close

PM 100% close

S 100% close

S 100% close
S 100% close

CD 100% close

k MCB nya.
mati. Masih di pantau dan masih terduga

7 REAR
MCB tidak trip.

coment open. Dan kabel limit switc indikasi


Dilaporkan Oleh,

Andika Respati . F
Pengawas Lapangan I & C
WORK TYPE

EKSEKUTOR

Tito, Haris

Sugiyono, Aji

Sugiyono, Aji

Heriyanto, Adit

Sugiyono, Aji
Feri, Imam, Endra, Ade

Feri, Imam, Endra, Ade

Tito, Haris

Feri, Imam, Endra, Ade

Feri, Imam, Endra, Ade

Feri, Imam, Endra, Ade

Heriyanto, Adit

Heriyanto, Adit

Heriyanto, Adit

Sugiyono, Aji

Sugiyono, Aji

Sugiyono, Aji
Tito, Haris
LOKASI KERJA
CUACA

NO. URAIAN KEGIATAN


1
2
3
4
5
6
7
8
MANP
Project Leader IC
Pengawas Lap. IC
Teknisi
Asisten Teknisi
Rendal Har IC
Admin Har IC

DETAIL PEKERJAAN DAN

NO. URAIAN KEGIATAN


ADP19/20701

ADP19/21524
2

ADP19/20875
3
ADP19/20876
4

ADP19/20877
5

ADP19/20878
6
ADP19/20879
7

ADP19/20881
8

ADP19/20882
9

ADP19/20883
10

ADP19/20700
11

ADP19/20578
12

ADP19/20579
13

ADP19/20580
14

ADP19/20581
15

ADP19/20582
16

ADP19/20583
17

ADP19/20584
18

ADP19/20585
19

ADP19/20586
20

ADP19/20587
ADP19/21516

NO. PEKERJAAN/TEMUAN

1 MCB masih ON

2 4dx analyzer cpp

3 Perbaikan Limit switch outlet dumper Mill A


no.2 sisi Open yg mengakibatkan Trip.

Pm mixed bed a dan b


4dx tbs a, b, dan c

4DX FDF A

4DX FDF B

PM TDBFP BFPT A

Pengecekan PI furnace auxbol


Hasil pengecekan MCB Trip power outlet
dumper mill A:
1. Pengecekan awal beban ke solenoid di
semua di lepas MCB di ON masih trip.
2. Beban solenoid masih lepas dan kabel
jumper dari power MCB ke beban limit swith
di lepas dan breaker di ON tidak trip.
3. Selanjut nya pengetesan kabel ke beban
solenoid di pasang semua kecuali kabel
solenoid no 2 dan kabel limit no 2 sisi open
tidak di pasang MCB di ON tidak trip.
4. Lanjut pengetesan kabel solenoid di
pasang/dikonek. Jadi beban ke solenoid sudag
terpasang semua. Kecuali kabel limit swit no 2
sisi open. MCB di On tidak trip.
5. Selanjut kebale limit swit no 2 sisi open di
pasang/di konek ke terminal MCB langsung
trip.
6. Setelah di cek ke atas mill di limit swith nya
normal kondisi bersih dan kabel tidak ada yang
sobek.
7. Kondisi sekarang kabel dari limit swit no 2
sisi open di lepas dan terminal no 41- 42 di
jummper indikasi di panel lokal muncul open.
8. Kesimpulan nya kabel dari limit swit no 2 sisi
open yang bikin MCB power panel outlet mill A
Trip.

PM Generator

PM BFPT EH Oil

PM EH Oil Pump
4dx coal feeder C

Spesifikasi sodium nitrate untuk Na+


Spesifikasi KCL untuk Na+
Spesifikasi diisopropylamin untuk Na+

4DX MILL C

PM MOP NO 1 DAN 2 BFPT A DAN BFPT B

Lanjut pengecekan silica analyzer sampling


rack

Pngamanan limited switch cold damper mill C

Mengetahui,

I Gede Sukma S.R


Project Leader I & C
Mengetahui,

I Gede Sukma S.R


Project Leader I & C
LAPORAN KEGIATAN HARIAN MAINTENANCE OUTAGE
PEMELIHARAAN INSTRUMEN DAN KONTROL UNIT BOP
PT. INDONESIA POWER UJP PLTU JATENG 2 ADIPALA

: PLTU ADIPALA TANGGAL


: CERAH HARI ke-

URAIAN KEGIATAN

MANPOWER
: I Gede Sukma SR
: Andika Respati Firdaus
: Ahmad syifaul, Adhana Tito, Sugiyono, Heriyanto, Feri, Imam
: Adit, Endra, Harris, Aji, Ade
: Prawira Sakti
: Anisa Apriliawati

DETAIL PEKERJAAN DAN PERSENTASE PROGRESS


(%)
URAIAN KEGIATAN WO PROGRESS
(AC) SERVICE RUTIN AC STANDING FLOOR AREA HYDROGEN GENERATION STATIO
N MCC
S 100%

(BOP_A) Penunjukan PI  untuk furnance pressure lokal dan DCS tidak sama
CD 100%

4DX KONTROL INSTRUMEN AREA FDF A
S 100%
4DX KONTROL INSTRUMEN AREA FDF B
S 100%

4DX KONTROL INSTRUMEN AREA COAL FEEDER C
S 100%

4DX KONTROL INSTRUMEN AREA MILL C
S 100%
4DX KONTROL INSTRUMEN AREA TBS A
S 100%

4DX KONTROL INSTRUMEN AREA TBS B
S 100%

4DX KONTROL INSTRUMEN AREA TBS C
S 100%

4DX KONTROL INSTRUMEN ANALYZER AREA CPP
S 100%

(AC) SERVICE RUTIN  AC CENTRAL/AHU AREA ELECTRIC CCR / BOILER ELECTRONIC
S 100%

PEMELIHARAAN RUTIN INSTRUMEN MIXED BED A  (4 MINGGUAN)
PM 100%

PEMELIHARAAN RUTIN INSTRUMEN MIXED BED B  (4 MINGGUAN)
PM 100%

PEMELIHARAAN RUTIN INSTRUMEN TURBINE SAFETY SUPERVISORY INSTRUMENT
ION (TSI)  (4 MINGGUAN)
PM 100%

PEMELIHARAAN RUTIN INSTRUMEN BFPT A/B LUBE OIL SYSTEM  (4 MINGGUAN)
PM 100%

PEMELIHARAAN RUTIN INSTRUMEN BFPT A/B EH OIL  & CONTROL SYSTEM  (4 MI
NGGUAN)
PM 100%

PEMELIHARAAN RUTIN INSTRUMEN TDBFP (POMPA) METAL TEMPERATURE MEA
SUREMENT  (4 MINGGUAN)
PM 100%

PEMELIHARAAN RUTIN INSTRUMEN BFPT SAFETY SUPERVISORY INSTRUMENTION
 (MTSI)  (4 MINGGUAN)
PM 100%

PEMELIHARAAN RUTIN INSTRUMEN ELECTRO HYDRAULIC OIL PUMP (4 MINGGUA
N)
PM 100%

PEMELIHARAAN RUTIN INSTRUMEN GENERATOR UNIT 1  (4 MINGGUAN)
PM 100%

PEMELIHARAAN RUTIN INSTRUMEN GENERATOR HYDROGEN SISTEM  (4 MINGGU
AN)
PM 100%
(BOP_A) (CE) Pressure HPU CWP  B low
CD 100%

FEEDBACK

- Problem :
- Actual Action :
- Hasil Akhir :
- Summary :

- Problem :
- Actual Action : Display temperatur rusak
Terdapat alarm pada Silicaa analyzer
Cairan sodium nitrate untuk Na analyzer tinggal sedikit
- Hasil Akhir :
- Summary :

- Penyebab :
- Actual Action : Untuk kabel dari limit switc no 2 sisi open yang mengakibatkan MCB trip. Sekarang posisi di
jumper dan kabel dari limit swit di lepas indikasi di panel nyala.
- Hasil Akhir :
- Summary :

- Problem :
- Penyebab :
- Actual Action : Modul analyzer conductivity mixed bed A rusak
Indikasi no 2 nyala setelah di jumper.
Sambil pengecekan di limit swit nya.
- Hasil Akhir :
- Summary :
- Problem : Untuk panel pengoprasian lokal tbs sudah berkarat dan rapuh
■ Untuk kabel tray area tbs rapuh dan rusak
- Penyebab :
- Actual Action : TBS A beroprasi
. Level in tbs: 7.85 m
. Level out tbs : 7.77 m
. Level in trashcar :7.78 m
. Posisi mov water spray tbs open 100%
. Limit switch jump buth di cek visual
. Limit switch chain draw d cek visual
2.TBS B running
. Level in tbs: 7.81m
. Level out tbs : 7.72 m
. Level in trashcar :7.75 m
. Posisi mov water spray tbs open 100%
. Limit switch jump buth secara visual normal
. Limit switch chain draw secara visual normal
3.TBS C stop
. Level in tbs: 7.92 m
. Level out tbs : 7.66 n
. Level in trashcar: 7.88 m
. Posisi mov water spray tbs open 0%
. Limit switch jump buth di test normal
. Limit switch chain draw di tes normal
- Hasil Akhir :
- Summary :

- Problem :
- Penyebab :
- Actual Action : Selang surge masih normal
- Hasil Akhir :
- Summary :

- Problem :
- Penyebab :
- Actual Action : Selang surge masih normal
- Summary :

- Problem :
- Penyebab :
- Actual Action :
- Summary :

- Problem :
- Penyebab :
- Actual Action : Hasil pengecekan PI normal (-)
(+)
Pi normal cuma perlu ganti dengan range yang lebih besar ( - 1 ~ 0 kpa atau - 1 ~ 1 kpa) karna yang skrg (-5 ~ 5
kpa) jadi gesernya cuma dikit, operator g bisa membedakan. Sedang yang di Tampilan HMI normal oprasi cuma -
100 sampai - 150 Pa..

- Hasil Akhir :
- Summary :
- Problem :
- Penyebab :
- Actual Action :
- Hasil Akhir :
- Summary :

- Problem :
- Penyebab :
- Actual Action :
- Hasil Akhir :
- Summary :

- Problem :
- Penyebab :
- Actual Action :
- Hasil Akhir :
- Summary :

- Problem :
- Penyebab :
- Actual Action :
- Hasil Akhir :
- Summary :
- Problem :
- Penyebab :
- Actual Action :
- Hasil Akhir :
- Summary :

- Problem :
- Penyebab :
- Actual Action :
- Hasil Akhir :
- Summary :

- Problem :
- Penyebab :
- Actual Action :
- Hasil Akhir :
- Summary :

- Problem :
- Penyebab :
- Actual Action :
- Hasil Akhir :
- Summary :

- Problem :
- Penyebab :
- Actual Action :
- Hasil Akhir :
- Summary :

- Problem :
- Penyebab :
- Actual Action :
- Hasil Akhir :
- Summary :
: Kamis /05 September 2019
: 05

WORK TYPE

RESS

STATUS EKSEKUTOR

close

close Imam, Endra, Ade

close Sugiyono, Aji

close Sugiyono, Aji

close Tito, Haris

close Sugiyono, Aji


close Imam, Endra, Ade

close Imam, Endra, Ade

close Imam, Endra, Ade

close Imam, Endra, Ade

close

close Imam, Endra, Ade

close Imam, Endra, Ade

close Tito, Haris

close Sugiyono, Aji

close Sugiyono, Aji

close Heriyanto, Adit

close Heriyanto, Adit

close Heriyanto, Adit

close Heriyanto, Adit

close Heriyanto, Adit


close Imam, Endra, Ade
Dilaporkan Oleh,

Andika Respati . F
Pengawas Lapangan I &
C
Dilaporkan Oleh,

Andika Respati . F
Pengawas Lapangan I &
C
LAPORAN KEGIATAN HARIAN MAINTENANCE OUTAGE
PEMELIHARAAN INSTRUMEN DAN KONTROL UNIT BOP
PT. INDONESIA POWER UJP PLTU JATENG 2 ADIPALA

LOKASI KERJA : PLTU ADIPALA


CUACA : CERAH

NO. URAIAN KEGIATAN


1
2
3
4
5
6
7
8
MANPOWER
Project Leader IC : I Gede Sukma SR
Pengawas Lap. IC : Andika Respati Firdaus
Teknisi : Ahmad syifaul, Adhana Tito, Sugiyono, Heriyanto, Feri, Imam
Asisten Teknisi : Adit, Endra, Harris, Aji, Ade
Rendal Har IC : Prawira Sakti
Admin Har IC : Anisa Apriliawati

DETAIL PEKERJAAN DAN PERSENTA

NO. URAIAN KEGIATAN


ADP19/20884 4DX KONTROL INSTRUMEN AREA COAL FEEDER E

ADP19/20885 4DX KONTROL INSTRUMEN AREA MILL E
2

ADP19/20886 4DX KONTROL INSTRUMEN AREA IGNITER OF BURNER LEVEL C
3
ADP19/20887 4DX KONTROL INSTRUMEN AREA PLC PURIFYING
4

ADP19/20888 4DX KONTROL INSTRUMEN AREA CWP A
5
ADP19/20889 4DX KONTROL INSTRUMEN AREA CWP B
6

ADP19/20890 4DX KONTROL INSTRUMEN AREA CWP C
7

ADP19/20891 4DX KONTROL INSTRUMEN ANALYZER AREA SAMPLING RACK
8

ADP19/20702 (AC) SERVICE RUTIN AC STANDING FLOOR AREA HV AC ROOM / HV AC ROOM MC
C
9

ADP19/20703 (AC) SERVICE RUTIN AC STANDING FLOOR AREA BOILER STAGE MCC / START UP B
OILER
10

ADP19/20704 (AC) SERVICE RUTIN AC STANDING FLOOR UNIT A, UNIT B DAN UNIT C AREA PORT
ABLE CLORINT PLANT RECTIFIER TRANSFORMER
11

ADP19/21570 (Unit) Lampu Penerangan panel coal feeder B mati
12

ADP19/21577 (CE) (Unit) Feedback flow rate coal feeder C tidak linier
13

NO. PEKERJAAN/TEMUAN FEEDBACK

- Problem :
1 Penyiraman tanaman - Actual Action :
- Hasil Akhir :
- Summary :

- Problem :
2 Masih lanjut pengecekan silica - Actual Action :
analyzer sampling rack - Hasil Akhir :
- Summary :

- Penyebab :
3 Lampu panel CF B sudah dipasang - Actual Action :
- Hasil Akhir :
- Summary :
- Problem :
- Penyebab :
- Actual Action : Parameter CWP A
level oil = 70
Press out cwp = 0.145 mpa
Perss inlet colling = 0.48 mpa
-Press
Problem :
lubricating = 0.217 mpa
-Press
Penyebab
Hyd = :14 mpa
-Power
Actualsupply
Actionin: Kabel
: 231 vdari
ac limit swit no 2 sisi open di lepas
Kabel
Power suply out rectifierke
dari terminal box panel
= 23.7 lokal yang di lepas kemaren di pasang
v dc
Kabel dari terminal box ke panel lokal sudah di pasang di terminal no 41-42 hasil MCB tidak tri
Lepas kabel limit swit no 2 sisi nya kabel limit swit dari terminal box ke panel lokal aman tidak short, yang short kabel dari ter
open yang ke terminal box Catatan
limit
1.cwpswitch
a dalamnokondisi
2 sisi open.
beroprasi lampu indikator normal dan tidak ada error
Saat mill stop bisa
2.tidak ada kebocoran di rencanakan gantinya
di line hydrolic kabel dari limit swith no 2 sisi open ke terminal box.
Terminal no 41-42
3.PLC kondisi Run sekarang kondisi di konek.
- Hasil Akhiractif
I/O yang :
- Summary
DI = 5 :
DO = 0 dan 7
Relay actif =
220 v ac = nomer 4.
24 V DC = Nomer 1,5 dan 6
PS sudah di cek normal serta di lakukan pelumasan pada switch

Parameter CWP B
level oil = 80
Press out cwp = 0,158 mpa
Perss inlet colling = 0.48 mpa
Press lubricating = 0.217 mpa
Press Hyd = 11. 5mpa
Power supply in = 231.7 v ac
Power supply out rectifirr = 23.7
Catatan
4dx cwp 1, 2, dan 3 1.cwp b dalam kondisi beroprasi. lampu indikator normal dan tidak ada error
2. Tidak ada kebocoran di line hudraulic nya
3.PLC kondisi Run
I/O yang actif
DI = 5
DO = 0 dan 7
Relay activ =
220 v ac = nomer 1.
24 V DC = Nomer 2.5 dan 6
PS sudah di cek normal serta di lakukan pelumasan pada switch

Parameter CWP C
level oil = 65
Press out cwp = 0.mpa
Perss inlet colling = 0.48 mpa
Press lubricating = 0.217 mpa
Press Hyd = 14 mpa
Power supply in =230.9 v ac
-Power
Problem : out rectifier = 23.83 v dc
supply
- Penyebab :
-Catatan
Actual Action :*DP Transmitter Debris A Normal,
Pengecekan transmitter debris Dilakukan Pengecekan
1.cwp C dalam LinE Tube
kondisi stop, lampudengan membuka
indikator normal Line drainada
dan tidak DPTerror
Sisi High dan Low Air keluar
filter A *Masalah DP transmitter Debris A high karna Valve Blowdown Menutup
2. kebocoran oil HYD di conector solenoid slowly close saat kondisi cwp stop Sendiri
tidak(Kawat
ada pengik
Blowdown
3.PLC kondisiPutus)
Run
*Setelah
I/O yangValve
actifDi Open DP turun.
- Hasil
DI = Akhir
6 :
- Summary :
DO :Q1 = 0
Relay actif =
220 v ac = nomer 1
24 V DC = Nomer 3 dan 5

PS sudah di cek normal serta di lakukan pelumasan pada switch


- Hasil Akhir :
- Summary :
- Problem :
- Penyebab :
Valve blowdone setelah d open - Actual Action :
- Summary :

- Problem :
4DX mill E - Penyebab :
- Actual Action :
- Summary :

- Problem :
- Penyebab :
4DX Ignitor Level C - Actual Action :
- Hasil Akhir :
- Summary :

- Problem :
Pelepasan control valve sisi up - Penyebab :
mmsf 6 (suport mekanik - Actual Action : Sudah di ganti baru
penggantian valve karena seret) - Hasil Akhir :
- Summary :

Akses mill F
Akses mill D progres - Problem :
Akses mill C - Penyebab :
Akses mill B - Actual Action :
Progress CF E - Hasil Akhir :
Progress cf D - Summary :
- Problem :
4dx coal feeder E . Density dan - Penyebab :
- Actual Action :
coal flow normal - Hasil Akhir :
- Summary :

- Problem : Alarm external di ctrl 6/56 rear


Alarm external di EXT 9-2 front
Cek patrol boiler elektrik room - Penyebab :
- Actual Action :
- Hasil Akhir :
- Summary :

- Problem :
- Penyebab :
- Actual Action : Di local 916 um/cm sedangkan pengukuran operator 922 um/cm. Hasil sudah
normal
Penunjukan di hmi 918 um/cm
Lanjut penggantian kabel sensor Ahirnya untuk type di ganti ke manual dan di set di temp 26° C, kalo type di bikin auto langsun
conductivity untuk swro modul B turun ke 665 um/cm. Karna kalkulasi dari temp yang sangat tinggi.. Kalo Perlu ganti sensor bs
kan unk ganti.
Penunjukan temp sangat tinggi, kalo actual paling sekitar 25~28°C saja. Sehingga sangat mem
pembacaan dari conductivity.
- Hasil Akhir :
- Summary :

- Problem :
- Penyebab :
Display DO dearatorr otl rusak - Actual Action :
- Hasil Akhir :
- Summary :

- Problem :
- Penyebab :
4dx sampling rack - Actual Action :
- Hasil Akhir :
- Summary :

- Problem :
4dx plc purifeying - Penyebab :
- Actual Action :
- Summary :

Mengetahui,

I Gede Sukma S.R


Project Leader I & C
Mengetahui,

I Gede Sukma S.R


Project Leader I & C
NANCE OUTAGE
TROL UNIT BOP
ENG 2 ADIPALA

TANGGAL : Jumat /06 September 2019


HARI ke- : 06

GIATAN

MANPOWER

EKERJAAN DAN PERSENTASE PROGRESS


(%)
WO STATUS
PROGRESS

S 100% close

S 100% close

S 100% close

S 100% close

S 100% close
S 100% close

S 100% close

S 100% close

S 100% close

S 100% close

S 100% close

CD 100% close

CD 100% close
ang
o 41-42 hasil MCB tidak trip. Kesimpulan
rt, yang short kabel dari terminal box ke
a error
i open ke terminal box.

da error

isi High dan Low Air keluar.


ror
utup Sendiri
wp stop tidak(Kawat
ada pengikat Valve
or 922 um/cm. Hasil sudah sama sudah

o type di bikin auto langsung pembacaan


Kalo Perlu ganti sensor bsok d agenda

aja. Sehingga sangat mempengaruhi hasil

Dilaporkan Oleh,

Andika Respati . F
Pengawas Lapangan I & C
Dilaporkan Oleh,

Andika Respati . F
Pengawas Lapangan I & C
WORK TYPE

EKSEKUTOR

Sugiyono,Heriyanto, Adit, Ade

Sugiyono,Heriyanto, Adit, Ade

Sugiyono,Heriyanto, Adit, Ade

Imam, Endra

Imam, Endra
Imam, Endra

Imam, Endra

Imam, Endra

Sugiyono,Heriyanto, Adit, Ade

Sugiyono,Heriyanto, Adit, Ade


LAPORAN KEGIATAN HARIAN MAINTENANCE OUTAGE
PEMELIHARAAN INSTRUMEN DAN KONTROL UNIT BOP
PT. INDONESIA POWER UJP PLTU JATENG 2 ADIPALA

LOKASI KERJA : PLTU ADIPALA


CUACA : CERAH

NO. URAIAN KEGIATAN


1
2
3
4
5
6
7
8
MANPOWER
Project Leader IC : I Gede Sukma SR
Pengawas Lap. IC : Andika Respati Firdaus
Teknisi : Ahmad syifaul, Adhana Tito, Sugiyono, Heriyanto, Feri, Imam
Asisten Teknisi : Adit, Endra, Harris, Aji, Ade
Rendal Har IC : Prawira Sakti
Admin Har IC : Anisa Apriliawati

DETAIL PEKERJAAN DAN PERSENTA

NO. URAIAN KEGIATAN


ADP19/20998 4DX KONTROL INSTRUMEN AREA PLC DAN PC DESAL

ADP19/20996 4DX KONTROL INSTRUMEN AREA COAL FEEDER F
2

ADP19/20997 4DX KONTROL INSTRUMEN AREA MILL F
3
ADP19/20705 (AC) SERVICE RUTIN  AC SPLIT UNIT A DAN UNIT B AREA RUANG OPERATOR
4

ADP19/20706 (AC) SERVICE RUTIN AC SPLIT AREA BATTERY ROOM / BATTERY ROOM UNIT
5

NO. PEKERJAAN/TEMUAN FEEDBACK


- Problem : Ext alarm: Modul A2 Cab Ext 11-2 Front, Modul A3 cab Ext 13-2 Front
Tidak ada grill exhaust fan cab: Net Cab 1 Front & CTRL 15/65 Front
1 Temuan patrol check ruang turbin Eternit jebol rembesan air dari atas ditadahin pake ember: potensi membahayakan peralatan k
elektronik: - Actual Action :
- Hasil Akhir :
- Summary :

- Problem : Monitoring Vibrasi PAF A alarm Alert


Temuan patrol check tuang boiler - Actual Action :
2 elektronik: - Hasil Akhir :
- Summary :

- Penyebab :
- Actual Action : Seting limit swit
3 Modif dudukan limit switc lock Lock shut off mill C
shut off cold mill C
Sesudah di modif dan sudah di test normal
- Hasil Akhir :
- Summary :

- Problem :
- Penyebab :
4DX PLC dan PC Desal - Actual Action :
- Hasil Akhir :
- Summary :

- Problem :
- Penyebab :
4DX mill F dan CF F - Actual Action :
- Hasil Akhir :
- Summary :

Mengetahui,

I Gede Sukma S.R


Project Leader I & C
I Gede Sukma S.R
Project Leader I & C
NANCE OUTAGE
TROL UNIT BOP
ENG 2 ADIPALA

TANGGAL : Sabtu /07 September 2019


HARI ke- : 07

GIATAN

MANPOWER

EKERJAAN DAN PERSENTASE PROGRESS


(%)
WO STATUS
PROGRESS

S 100% close

S 100% close

S 100% close

S 100% close

S 100% close
xt 13-2 Front

membahayakan peralatan kontrol dcs

Dilaporkan Oleh,

Andika Respati . F
Pengawas Lapangan I & C
Andika Respati . F
Pengawas Lapangan I & C
WORK TYPE

EKSEKUTOR

Andika, Sugiyono, Ade

Andika, Sugiyono, Ade

Andika, Sugiyono, Ade


LAPORAN KEGIATAN HARIAN MAINTENANCE OUTAGE
PEMELIHARAAN INSTRUMEN DAN KONTROL UNIT BOP
PT. INDONESIA POWER UJP PLTU JATENG 2 ADIPALA

LOKASI KERJA : PLTU ADIPALA


CUACA : CERAH

NO. URAIAN KEGIATAN


1
2
3
4
5
6
7
8
MANPOWER
Project Leader IC : I Gede Sukma SR
Pengawas Lap. IC : Andika Respati Firdaus
Teknisi : Ahmad syifaul, Adhana Tito, Sugiyono, Heriyanto, Feri, Imam
Asisten Teknisi : Adit, Endra, Harris, Aji, Ade
Rendal Har IC : Prawira Sakti
Admin Har IC : Anisa Apriliawati

DETAIL PEKERJAAN DAN PERSENTA

NO. URAIAN KEGIATAN


ADP19/21001 4DX KONTROL INSTRUMEN AREA PLC WWTP

ADP19/21000 4DX KONTROL INSTRUMEN AREA IGNITER OF BURNER LEVEL D
2

NO. PEKERJAAN/TEMUAN FEEDBACK

- Problem : Temuan mika regulator pneumatic D1 dan D3 tdk ada.


- Actual Action :
1 4dx ignitor barner level D - Hasil Akhir :
- Summary :
- Problem :
2 Isolating valve untuk air regulator - Actual Action :
D4 handwilnya ga ada - Hasil Akhir :
- Summary :

Progress pembuatan akses coal - Penyebab :


3 feeder E - Actual Action :
- Hasil Akhir :
- Summary :

- Problem :
- Penyebab :
Cek patrol boiler electronic - Actual Action : Terdapat alarm E pada modul D7 panel (CTRL 6/56 10CVA14 REAR)
- Hasil Akhir :
- Summary :

- Problem :
- Penyebab :
Modul vibrasi CEP normal - Actual Action :
- Hasil Akhir :
- Summary :

Cover modul relay output panel - Problem : Plafon tdk tertutup (dari pintu pojok sebelah utara/timur)
Ext 4-1 , 10CVA11 FRONT tidak
ada - Penyebab :
Alarm external pada modul - Actual Action :
- Hasil Akhir :
contac input Panel EXT 9-2 , - Summary :
10CVA24

- Problem : Tdk ada pengaman fan pd panel (CTRL 15/65 10CVA37 FRONT)
Terdapat alarm E pd modul A3 panel (EXT 13-2 10CVA33 FRONT)
Cek patrol turbin elektrik room Temuan Alarm E pada modul A2
- Penyebab :
- Actual Action :
- Summary :
- Problem :
- Penyebab :
Progress griting mill A,B,C,D,E,F
- Actual Action :
- Summary :

- Problem :
- Penyebab :
4dx plc wwtp - Actual Action :
- Hasil Akhir :
- Summary :

Mengetahui,

I Gede Sukma S.R


Project Leader I & C
NANCE OUTAGE
TROL UNIT BOP
ENG 2 ADIPALA

TANGGAL : Minggu /08 September 2019


HARI ke- : 08

GIATAN

MANPOWER

EKERJAAN DAN PERSENTASE PROGRESS


(%)
WO STATUS
PROGRESS

S 100% Close

S 100% Close
10CVA14 REAR)

ONT)
Dilaporkan Oleh,

Andika Respati . F
Pengawas Lapangan I & C
WORK TYPE

EKSEKUTOR

Feri, Endra, Aji

Feri, Endra, Aji


LAPORAN KEGIATAN HARIAN MAINTENANCE OUTAGE
PEMELIHARAAN INSTRUMEN DAN KONTROL UNIT BOP
PT. INDONESIA POWER UJP PLTU JATENG 2 ADIPALA

LOKASI KERJA : PLTU ADIPALA


CUACA : CERAH

NO. URAIAN KEGIATAN


1
2
3
4
5
6
7
8
MANPOWER
Project Leader IC : I Gede Sukma SR
Pengawas Lap. IC : Andika Respati Firdaus
Teknisi : Ahmad syifaul, Adhana Tito, Sugiyono, Heriyanto, Feri, Imam
Asisten Teknisi : Adit, Endra, Harris, Aji, Ade
Rendal Har IC : Prawira Sakti
Admin Har IC : Anisa Apriliawati

DETAIL PEKERJAAN DAN PERSENTA

NO. URAIAN KEGIATAN


ADP19/21004 4DX KONTROL INSTRUMEN AREA PEDESTAL TURBINE, BFPT A & B, EH OIL

ADP19/21003 4DX KONTROL INSTRUMEN AREA TURBINE ELECTRONIC ROOM
2

ADP19/21007 4DX KONTROL INSTRUMEN AREA COAL FEEDER D
3
ADP19/21008 4DX KONTROL INSTRUMEN AREA MILL D
4

ADP19/21010 4DX KONTROL INSTRUMEN AREA PLC COALY
5
ADP19/21011 4DX KONTROL INSTRUMEN AREA PLC DAN PC AUXBOL
6

ADP19/20594 PEMELIHARAAN RUTIN INSTRUMEN OIL TRANSFER PUMP A  (4 MINGGUAN)
7

ADP19/20595 PEMELIHARAAN RUTIN INSTRUMEN OIL TRANSFER PUMP B  (4 MINGGUAN)
8

ADP19/20596 PEMELIHARAAN RUTIN INSTRUMEN 1ST SWRO HPP A  (4 MINGGUAN)
9

ADP19/20597 PEMELIHARAAN RUTIN INSTRUMEN 1ST SWRO HPP B (4 MINGGUAN)
10

ADP19/20604 PEMELIHARAAN RUTIN INSTRUMEN CONDENSATE TRANSFER MOTOR PUMP A  (4
 MINGGUAN)
11

ADP19/20605 PEMELIHARAAN RUTIN INSTRUMEN CONDENSATE TRANSFER MOTOR PUMP B  (4
 MINGGUAN)
12

ADP19/20608 PEMELIHARAAN RUTIN INSTRUMEN BEARING OIL PUMP (BOP)  (4 MINGGUAN)
13

ADP19/20610 PEMELIHARAAN RUTIN INSTRUMEN STATOR COOLING WATER PUMP A (4 MINGG
UAN)
14

ADP19/20611 PEMELIHARAAN RUTIN INSTRUMEN STATOR COOLING WATER PUMP B (4 MINGG
UAN)
15

ADP19/20612 PEMELIHARAAN RUTIN INSTRUMEN GENERATOR WATER COOLING SYSTEM  (4 MI
NGGUAN)
16

ADP19/20707 (AC) SERVICE RUTIN AC CENTRAL/AHU AREA CCR LT.3 / CCR CONTROL ROOM UNI
T
17

ADP19/20708 (AC) SERVICE RUTIN AC SPLIT AREA R. REPARASI BATU BARA
18

ADP19/21588 (BOP) - Terdapat kebocoran pada solenoid valve online analyzer Na untuk CEP di 
sampling rack
19
ADP19/21609 (Unit) Pengecekan peralatan Instrumen dan terminasi kabel pada Mill A
20

ADP19/21407 pengecekan peralatan Instrumen pada Mill A trip karena mcb power outlet mill A 
trip
21

NO. PEKERJAAN/TEMUAN FEEDBACK

- Problem :
- Actual Action :
1 Pm oil transfer a dab b - Hasil Akhir :
- Summary :

- Problem : Plafond dlm ruangan jebol, yg di bawahnya terdapat ac


- Actual Action : Hasil pengecekan PLC dan PC Auxbol
. Power supply 221 AC dan supply output 23,9DC
. Modul normal tidak ada alarm
4dx plc auxbol dan cleaning . Tidak ada fasilitas fan panel
2 peralatan . Untuk suhu ruangan 22°C
. PC normal tidak eror
. Ups normal
- Hasil Akhir :
- Summary :

Proses penggantian kabel limit - Penyebab :


3 - Actual Action : Lanjut proses peerbaikan kabel limit switch no 2 sisi open outlet Mill A
swith no 2 sisi open outlet mill A - Hasil Akhir : Baru progres kabel limit switch no 2 dan 3. Lanjut besok
- Summary :

kabel limit switch yg penyebab - Problem :


short karena kabel lecet ke gesek - Penyebab :
gesek kena seng tray kabel. - Actual Action :
Karena lapisan nya di kupas sama - Hasil Akhir :
rusamas. - Summary :

- Problem :
Suport Mekanik Lepas MOV otlet -- Penyebab :
Actual Action :
Electric filter B - Hasil Akhir :
- Summary :
- Problem :
- Penyebab :
- Actual Action :Untuk kebocoran di konektor ini, hanya dilakukan pemotongan selang, karena
ngga ngunci pd konektor, setelah selang di potong dan di masukkan kembali ke konektor hasiln
kebocoran dan masih terus di pantau
Perbaikan kebocoran pd Na+ Untuk kebocoran bukan di solenoid valve, tapi di konektor probenya. Masalah : kebocoran, tin
analyzer dilakukan pengecekan pd sensor Na+, di ketahui kebocoran pd konektor selang probe, dilakuka
dgn cara di sealtape pd ulir konektor, dan penambahan silikon. Untuk hasil tdk ada kebocaran
dipantau
Dari sisi solenoid valve normal, tdk ada indikasi kebocoran dan hal" yg mencurigakan
- Hasil Akhir :
- Summary :

- Problem :
PM CTP A DAN CTP B - Penyebab :
- Actual Action :
- Summary :

- Problem :
Pm 1st stage caltridge filter A dan - Penyebab :
B - Actual Action :
- Summary :

- Problem :
Pelepasan kabel power dan - Penyebab :
- Actual Action : Mekanik Akan melakukan Penggantian Bearing Worm Gear (temuan bearing Ru
control mov outlet electric filter B - Hasil Akhir :
- Summary :

- Problem :
- Penyebab :
PM BOP - Actual Action :
- Hasil Akhir :
- Summary :
- Problem :
- Penyebab :
4DX TURBINE PDSTALL - Actual Action : Parameter dilokal
- Hasil Akhir :
- Summary :

- Problem :
- Penyebab :
4DX BFPT A DAN BFPT B - Actual Action :
- Hasil Akhir :
- Summary :

- Problem :
- Penyebab :
Pemasangan control pneumatic - Actual Action : Hasil pengetesan open close normal (perlu looptest pneuamtic ketika peralata
valve mmf 6 sisi upper operator, agar valve tdk seret, dan tdk mengganggu saat akan melakukan pengoprasian perala
- Hasil Akhir :
- Summary :

- Problem :
PM generator stator cooling - Penyebab :
water pump A dn B. Valve2 - Actual Action :
normal tdk ad yg fault. Nilai
konducticity normal - Hasil Akhir :
- Summary :

- Problem :
4dx turbine electronic room, V in - Penyebab :
supply PSU: ~231.05 VAC . Vout : - Actual Action : Alatm fault external EXT 11-2
23,85 VDC . Temperatur ruangan Alarm external di EXT- 13-2 front
23,5-25.5 degC . - Hasil Akhir :
- Summary :

Untuk sensor conductivity swro - Problem :


module B terdapat alarm (short - Penyebab :
circuit) kemungkinan perlu ganti - Actual Action : lanjutan pekerjaan hari jumat
sensor/probe conductivitynya.
Karena kemaren setelah di ganti - Hasil Akhir :
- Summary :
kabel hasil sempat normal
- Problem :
Suporting mekanik pemasangan - Penyebab :
- Actual Action : ditest dari lokal dan dari ccr untuk close dan open lancar.. Tidak ada fault
mov outlet electric filter B - Hasil Akhir :
- Summary :

Mengetahui,

I Gede Sukma S.R


Project Leader I & C
NANCE OUTAGE
TROL UNIT BOP
ENG 2 ADIPALA

TANGGAL : Senin /09 September 2019


HARI ke- : 09

GIATAN

MANPOWER

EKERJAAN DAN PERSENTASE PROGRESS


(%)
WO STATUS
PROGRESS

S 100% close

S 100% close

S 100% close

S 100% close

S 100% close
S 100% close

PM 100% close

PM 100% close

PM 100% close

PM 100% close

PM 100% close

PM 100% close

PM 100% close

PM 100% close

PM 100% close

PM 100% close

S 100% close

S 100% close

CD 100% close
CD 100% close

CD 100% close

si open outlet Mill A


ok
emotongan selang, karena sudah kendor,
kembali ke konektor hasilnya tdk ada
a. Masalah : kebocoran, tindakan :
ktor selang probe, dilakukan penormalan
uk hasil tdk ada kebocaran dan msh

yg mencurigakan

m Gear (temuan bearing Rusak)


pneuamtic ketika peralatan stop dr
kukan pengoprasian peralatan)
ancar.. Tidak ada fault

Dilaporkan Oleh,

Andika Respati . F
Pengawas Lapangan I & C
WORK TYPE

EKSEKUTOR

Tito, Haris

Tito, Haris

Tito, Haris

Sugiyono, Aji

Feri, Endra, Ade


Feri, Endra, Ade

Feri, Endra, Ade

Feri, Endra, Ade

Feri, Endra, Ade

Feri, Endra, Ade

Heriyanto, Adit

Heriyanto, Adit

Heriyanto, Adit

Sugiyono, Aji

Sugiyono, Aji

Sugiyono, Aji

Feri, Endra, Ade


Heriyanto, Adit

Sugiyono, Aji
LAPORAN KEGIATAN HARIAN MAINTENANCE OUTAGE
PEMELIHARAAN INSTRUMEN DAN KONTROL UNIT BOP
PT. INDONESIA POWER UJP PLTU JATENG 2 ADIPALA

LOKASI KERJA : PLTU ADIPALA


CUACA : CERAH

NO. URAIAN KEGIATAN


1
2
3
4
5
6
7
8
MANPOWER
Project Leader IC : I Gede Sukma SR
Pengawas Lap. IC : Andika Respati Firdaus
Teknisi : Ahmad syifaul, Adhana Tito, Sugiyono, Heriyanto, Feri, Imam
Asisten Teknisi : Adit, Endra, Harris, Aji, Ade
Rendal Har IC : Prawira Sakti
Admin Har IC : Anisa Apriliawati

DETAIL PEKERJAAN DAN PERSENTA

NO. URAIAN KEGIATAN


ADP19/21012 4DX KONTROL INSTRUMEN AREA IDF A

ADP19/21013 4DX KONTROL INSTRUMEN AREA IDF B
2

ADP19/21014 4DX KONTROL INSTRUMEN AREA COAL FEEDER A
3
ADP19/21015 4DX KONTROL INSTRUMEN AREA MILL A
4

ADP19/21016 4DX KONTROL INSTRUMEN AREA DCS CHLORIN
5
ADP19/21017 4DX KONTROL INSTRUMEN AREA DCS OIL PUMP HOUSE
6

ADP19/20710 (AC) SERVICE RUTIN AC STANDING FLOOR AREA COALY WASTE WATER ELECTRIC 
ROOM
7

ADP19/20711 (AC) SERVICE RUTIN AC SPLIT AREA LAB INSTRUMENTASI
8

ADP19/13763 (AC) Suara kasar Blower AC standing Floor di ruangan station switch gear room
9

ADP19/20591 PEMELIHARAAN RUTIN INSTRUMEN TURBINE DIAGNOSTIC SYSTEM (4 MINGGUA
N)
10

ADP19/20592 PEMELIHARAAN RUTIN INSTRUMEN TURBINE CONTROL CABINET (4 MINGGUAN)
11

ADP19/20593 PEMELIHARAAN RUTIN INSTRUMEN OPERATION WORK STATION (OWS) (4 MING
GUAN)
12

ADP19/20598 PEMELIHARAAN RUTIN INSTRUMEN DEMINERALIZED WATER PUMP (1) A  (4 MIN
GGUAN)
13

ADP19/20599 PEMELIHARAAN RUTIN INSTRUMEN DEMINERALIZED WATER PUMP (1) B  (4 MIN
GGUAN)
14

ADP19/20600 PEMELIHARAAN RUTIN INSTRUMEN DEMINERALIZED WATER PUMP B  (4 MINGG
UAN)
15

ADP19/20601 PEMELIHARAAN RUTIN INSTRUMEN COALY WASTE WATER PUMP (4 MINGGUAN)
16

ADP19/20613 PEMELIHARAAN RUTIN INSTRUMEN H2 SEAL OIL PUMP A  (4 MINGGUAN)
17

ADP19/20614 PEMELIHARAAN RUTIN INSTRUMEN H2 SEAL OIL PUMP B  (4 MINGGUAN)
18

ADP19/20615 PEMELIHARAAN RUTIN INSTRUMEN AIR SIDE AC SEAL OIL PUMP   (4 MINGGUAN)
19
ADP19/20709 (AC) SERVICE RUTIN AC STANDING FLOOR AREA BOILER PDC
20

ADP19/21770 Setting Damper IDF Auxiliary Boiler ( Pembukaan Damper IDF Auxiliary Boiler anta
ra lokal dan DCS tidak sama)
21

ADP19/21781 Setting Damper FDF Auxiliary Boiler ( Pembukaan Damper FDF Auxiliary Boiler ant
ara lokal dan DCS tidak sama)
22

ADP19/21819 (Unit) : Regulator supply udara instrument F6 bocor
23

ADP19/21836 (Unit) Secondary damper D5 feedback stak di 66% (Direset hilang saat dioperasik
an dri ccr muncul lg)
24

NO. PEKERJAAN/TEMUAN FEEDBACK

- Problem :
- Actual Action :
1 4DX IDF A&B - Hasil Akhir :
- Summary :

- Problem :
2 Masih proses tarik kabel limit - Actual Action :
switch outlet dumper mill A. - Hasil Akhir :
- Summary :

- Penyebab : Kable tray rapuh dan berkarat


PI otl coagulant pump 1 over scale
3 Pm coaly wtp Sensor turbidity kolam coaly rusak (skrg belum terpasang)
- Actual Action :
- Hasil Akhir :
- Summary :

- Problem :
- Penyebab :
PM H2 Seal Pump A/B - Actual Action :
- Hasil Akhir :
- Summary :
- Problem :
- Penyebab :
PM Air Side AC Seal Pump - Actual Action :
- Hasil Akhir :
- Summary :

- Problem : Panel EXT 16-2 10CVA 42 FRONT


Terdapat alarm E pd modul A3
- Penyebab :
- Actual Action :Hasil pengecekan DCS chlorine
1. alrm external pada modul contac input A3 (panel ext 16-2 10CVA42 FRONT) sudah normal
2. Tegangan dari Supply back up = 218 v AC
4dx dcs chlorine 3. Tegangan dari supply = 232V AC
4. Tegangan output rectifier masing2 = 23. 9 V DC
5. AC hidup dan temperatur 20'C
6. Fan Untuk panel DCS normal semua
7. Alarm modul vibrasi CWP C tidak ada
8. UPS normal
- Hasil Akhir :
- Summary :

- Problem :
- Penyebab :
- Actual Action : Hasil pengecekan DCS oil pump house
1. tidak di temukan error pada setiap modul
4dx dcs oil pump house 2. Tegangan dari UPS = 218 AC
3. Tegangan dari supply = 229 AC
4. Tegangan output rectifier masing2 = 23. 9V DC
5. AC hidup dan temperatur 17 'C
6. Fan panel normal
- Summary :

- Problem :
- Penyebab :
PM OWS - Actual Action :
- Summary :

- Problem :
- Penyebab :
PM TDM - Actual Action :
- Hasil Akhir :
- Summary :

- Problem :
- Penyebab :
4DX CF A - Actual Action :
- Hasil Akhir :
- Summary :
- Problem :
Pm water supply pump 1A, 1B, - Penyebab :
- Actual Action :
dan B - Hasil Akhir :
- Summary :

- Problem : Alarm faul external temuan msh sama


PM dan cek Panel turbin
electronic room , temuan fault - Penyebab :
- Actual Action :
external msh sama - Hasil Akhir :
- Summary :

Troibleshooting SR Sec damper - Problem :


no. D5 . MOV fault Dilakukan - Penyebab :
reset dan kasih wd di penggerak - Actual Action :
steam . Tes remote 55-65% - Hasil Akhir :
normal indikasi - Summary :

- Problem :
Follow Mekanik Pengecekan Rutin - Penyebab :
Maintenance Compressor Air - Actual Action :
Dryer bareng vandor. - Hasil Akhir :
- Summary :

- Problem :
- Penyebab :
Pelepasan RTD GRINDING ROOL
MILL A - Actual Action :
- Hasil Akhir :
- Summary :

- Problem :
Tarik kabel limit swith no 1,2,3 - Penyebab :
finish. Besok tinggal konek ke - Actual Action :
terminal box - Hasil Akhir :
- Summary :

Mengetahui,

I Gede Sukma S.R


Project Leader I & C
NANCE OUTAGE
TROL UNIT BOP
ENG 2 ADIPALA

TANGGAL : Selasa /10 September 2019


HARI ke- : 10

GIATAN

MANPOWER

EKERJAAN DAN PERSENTASE PROGRESS


(%)
WO STATUS
PROGRESS

S 100% close

S 100% close

S 100% close

S 100% close

S 100% close
S 100% close

S 100% close

S 100% close

CD 100% close

PM 100% close

PM 100% close

PM 100% close

PM 100% close

PM 100% close

PM 100% close

PM 100% close

PM 100% close

PM 100% close

PM 100% close
S 100% close

S 100% close

S 100% close

CD 100% close

CD 100% close
42 FRONT) sudah normal
Dilaporkan Oleh,

Andika Respati . F
Pengawas Lapangan I & C
WORK TYPE

EKSEKUTOR

Heriyanto, Ade

heriyanto, Ade

Heriyanto, Ade

Sugiyono, Aji

Feri, Imam, Endra


Feri, Imam, Endra

Tito, Haris

Tito, Haris

Tito, Haris

Feri, Imam, Endra

Feri, Imam, Endra

Feri, Imam, Endra

Feri, Imam, Endra

Heriyanto, Ade

Heriyanto, Ade

Heriyanto, Ade
Sugiyono, Aji

Sugiyono, Aji

Heriyanto, Ade

Tito, Haris
LAPORAN KEGIATAN HARIAN MAINTENANCE OUTAGE
PEMELIHARAAN INSTRUMEN DAN KONTROL UNIT BOP
PT. INDONESIA POWER UJP PLTU JATENG 2 ADIPALA

LOKASI KERJA : PLTU ADIPALA


CUACA : CERAH

NO. URAIAN KEGIATAN


1
2
3
4
5
6
7
8
MANPOWER
Project Leader IC : I Gede Sukma SR
Pengawas Lap. IC : Andika Respati Firdaus
Teknisi : Ahmad syifaul, Adhana Tito, Sugiyono, Heriyanto, Feri, Imam
Asisten Teknisi : Adit, Endra, Harris, Aji, Ade
Rendal Har IC : Prawira Sakti
Admin Har IC : Anisa Apriliawati

DETAIL PEKERJAAN DAN PERSENTA

NO. URAIAN KEGIATAN


ADP19/20712 (AC) SERVICE RUTIN  AC SPLIT UNIT A DAN UNIT B AREA ELECTRIC MAINTC (RUAN
G STANDBY HARLIST)
1

ADP19/20713 (AC) SERVICE RUTIN AC STANDING FLOOR AREA CLORINT PLANT MCC
2

ADP19/20714 (AC) SERVICE RUTIN AC STANDING FLOOR AREA PORTABLE CLORINT PLANT MCC
3
ADP19/20602 PEMELIHARAAN RUTIN INSTRUMEN HIGH PRESSURE RINSING PUMP A (4 MINGG
UAN)
4

ADP19/20603 PEMELIHARAAN RUTIN INSTRUMEN HIGH PRESSURE RINSING PUMP B (4 MINGG
UAN)
5
ADP19/20620 PEMELIHARAAN RUTIN INSTRUMEN COOLING WATER BOOSTER PUMP FOR MOT
OR CWP 1  (4 MINGGUAN)
6

ADP19/20621 PEMELIHARAAN RUTIN INSTRUMEN COOLING WATER BOOSTER PUMP FOR MOT
OR CWP 2  (4 MINGGUAN)
7

ADP19/20622 PEMELIHARAAN RUTIN INSTRUMEN CLOSE CYCLE COOLING WATER PUMP A (CCC
WP A)  (4 MINGGUAN)
8

ADP19/20623 PEMELIHARAAN RUTIN INSTRUMEN CLOSE CYCLE COOLING WATER PUMP B (CCC
WP B)  (4 MINGGUAN)
9

ADP19/20624 PEMELIHARAAN RUTIN INSTRUMEN MAIN OIL PUMP NO.1 BFPT A  (4 MINGGUAN
)
10

ADP19/20625 PEMELIHARAAN RUTIN INSTRUMEN MAIN OIL PUMP NO.2 BFPT A  (4 MINGGUAN
)
11

ADP19/20626 PEMELIHARAAN RUTIN INSTRUMEN MAIN OIL PUMP NO.1 BFPT B  (4 MINGGUAN
)
12

ADP19/20627 PEMELIHARAAN RUTIN INSTRUMEN MAIN OIL PUMP NO.2 BFPT B  (4 MINGGUAN
)
13

ADP19/21883 penggantian Fan dan pemasangan  Metal Grill Cabinet Turbine electric Room
14

ADP19/21047 4DX KONTROL INSTRUMEN AREA BOILER ELECTRONIC ROOM
15

ADP19/21048 4DX KONTROL INSTRUMEN AREA PAF A
16

ADP19/21049 4DX KONTROL INSTRUMEN AREA PAF B
17

ADP19/21050 4DX KONTROL INSTRUMEN AREA COAL FEEDER B
18

ADP19/21051 4DX KONTROL INSTRUMEN AREA MILL B
19
ADP19/21052 4DX KONTROL INSTRUMEN AREA DCS CPP
20

ADP19/21053 4DX KONTROL INSTRUMEN AREA PLC H2 PLANT
21

NO. PEKERJAAN/TEMUAN FEEDBACK

- Problem :
- Actual Action : Hasil pengecekan PLC dan PC H2 plant unit 1 dan 2
▪power supply 220 vac
▪Untuk modul sisi primer dan backup tidak ada alarm (normal)
1 4dx PC dan PLC H2 plant ▪Fan panel normal
▪Untuk suhu ruangan 22°C
▪ PC sementara normal tidak eror
- Hasil Akhir :
- Summary :

- Problem :
Lanjut pemasangan terminasi box - Actual Action :
2 Limit switch 1,2,3 dan cover kabel
- Hasil Akhir :
tray. - Summary :

Pm cooling water booster pump - Penyebab :


3 for cwp a dan b - Actual Action :
- Hasil Akhir :
- Summary :

- Problem :
- Penyebab :
Perbaikan indikasi Trouble Ignitor - Actual Action : Indikasi ignitor Gun C4 sudah normal, di tes insert/retrack normal. Masalah Lim
Gun C4 menyentuh.
- Hasil Akhir :
- Summary :

- Problem :
- Penyebab :
- Actual Action : Dan follow HL pengecekan VFD HP Rinsing A ( sudah bisa d command unk frequ
Pm hp rinsing a dan b feedback ada perbedaan dengan command.
- Hasil Akhir :
- Summary :

- Problem :
- Penyebab :
4DX CF B - Actual Action :
- Hasil Akhir :
- Summary :
- Problem :
Survey pendataan valve fisher dr - Penyebab :
vendor PTCS - Actual Action :
- Summary :

- Problem : Fan panel mati


Ada alarm external modul D7 dan D6
Alarm modul dan fan mati ada di panel CTRL 17/67 10CVA 46 REAR
- Penyebab :
- Actual Action : Hasil pengecekan DCS cpp
. Ditemuakn alarm external pada modul digital input D6 dan 7 ( CTRL 17/67 ,10CVA46 REAR)
4dx dcs cpp 2. Tegangan dari UPS = 226VAC1
3. Tegangan dari supply = 230 VAC
4. Tegangan output rectifier masing2 = 23,9 VDC
5. AC hidup dan temperatur 22' C
6. Fan Untuk panel DCS mati 1 buah (24 dc)
7. Kondisi grounding aman
- Summary :

- Problem :
- Penyebab :
PM MOP BFPT A.no1,2 - Actual Action :
- Hasil Akhir :
- Summary :

- Problem :
- Penyebab :
PM MOP BFPT B.no.1,2 - Actual Action :
- Hasil Akhir :
- Summary :

- Problem :
Pendampingan Vendor - Penyebab :
Compressor Air Dryeer Bareng - Actual Action : Penggantian Timer Solenoid Drain trap Dryer A Rusak. Dilakukan Penggantian
mekanik. Baru Warisan Dari HAR EP. Hasil Normal.
- Hasil Akhir :
- Summary :

- Problem :
- Penyebab :
Outlet mill sudah normal - Actual Action :
- Hasil Akhir :
- Summary :
Kabel limit swit no 1,2,3 sudah di - Problem :
ganti. Kabel limit swit no 4,5,6 di - Penyebab :
- Actual Action :
tanbahin conduit biar kalo ke - Hasil Akhir :
gesek gesek masih aman. - Summary :

- Problem :
- Penyebab :
Cek patrol dan 4Dx boiler - Actual Action :
electronic.
- Hasil Akhir :
- Summary :

Mengetahui,

I Gede Sukma S.R


Project Leader I & C
NANCE OUTAGE
TROL UNIT BOP
ENG 2 ADIPALA

TANGGAL : Rabu /11 September 2019


HARI ke- : 11

GIATAN

MANPOWER

EKERJAAN DAN PERSENTASE PROGRESS


(%)
WO STATUS
PROGRESS

S 100% close

S 100% close

S 100% close

PM 100% close

PM 100% close
PM 100% close

PM 100% close

PM 100% close

PM 100% close

PM 100% close

PM 100% close

PM 100% close

PM 100% close

CD 100% close

S 100% close

S 100% close

S 100% close

S 100% close

S 100% close
S 100% close

S 100% close

retrack normal. Masalah Limit switch tidak

bisa d command unk frequency) untuk


L 17/67 ,10CVA46 REAR)

ak. Dilakukan Penggantian Timer Solenoid


Dilaporkan Oleh,

Andika Respati . F
Pengawas Lapangan I & C
WORK TYPE

EKSEKUTOR

Feri, Imam, Endra, Ade

Feri, Imam, Endra, Ade


Feri, Imam, Endra, Ade

Feri, Imam, Endra, Ade

Feri, Imam, Endra, Ade

Feri, Imam, Endra, Ade

Heriyanto, Haris

Heriyanto, Adit

Heriyanto, Adit

Heriyanto, Adit

Adhana Tito, Haris

Sugiyono, Aji

Sugiyono, Aji

Heriyanto, Adit

Sugiyono, Aji
Feri, Imam, Endra, Ade

Feri, Imam, Endra, Ade


LAPORAN KEGIATAN HARIAN MAINTENANCE OUTAGE
PEMELIHARAAN INSTRUMEN DAN KONTROL UNIT BOP
PT. INDONESIA POWER UJP PLTU JATENG 2 ADIPALA

LOKASI KERJA : PLTU ADIPALA


CUACA : CERAH

NO. URAIAN KEGIATAN


1
2
3
4
5
6
7
8
MANPOWER
Project Leader IC : I Gede Sukma SR
Pengawas Lap. IC : Andika Respati Firdaus
Teknisi : Ahmad syifaul, Adhana Tito, Sugiyono, Heriyanto, Feri, Imam
Asisten Teknisi : Adit, Endra, Harris, Aji, Ade
Rendal Har IC : Prawira Sakti
Admin Har IC : Anisa Apriliawati

DETAIL PEKERJAAN DAN PERSENTA

NO. URAIAN KEGIATAN


ADP19/20606 PEMELIHARAAN RUTIN INSTRUMEN DIGITAL ELECTRO HYDROULIC SYSTEM (DEH) 
(4 MINGGUAN)
1

ADP19/20607 PEMELIHARAAN RUTIN INSTRUMEN EMERGENCY TRIP CONTROL  SISTEM (ETS) (4 
2 MINGGUAN)

ADP19/20609 PEMELIHARAAN RUTIN INSTRUMEN GENERATOR METAL TEMPERATURE CONTRO
3 L SYSTEM (4 MINGGUAN)
ADP19/20616 PEMELIHARAAN RUTIN INSTRUMEN GENERATOR SEALING OIL SYSTEM  (4 MINGG
UAN)
4

ADP19/20617 PEMELIHARAAN RUTIN INSTRUMEN CIRCULATING WATER PUMP 1 (CWP 1)  (4 MI
NGGUAN)
5
ADP19/20618 PEMELIHARAAN RUTIN INSTRUMEN CIRCULATING WATER PUMP 2 (CWP 2)  (4 MI
NGGUAN)
6

ADP19/20619 PEMELIHARAAN RUTIN INSTRUMEN CIRCULATING WATER PUMP 3 (CWP 3)  (4 MI
NGGUAN)
7

ADP19/20628 PEMELIHARAAN RUTIN INSTRUMEN MEH&METS (4 MINGGUAN)
8

ADP19/21924 (BOP_A) Handle manual valve  PI outlet purified pump 2 patah karena korosi  W
WTP
9

ADP19/21054 4DX KONTROL INSTRUMEN AREA FDF A
10

ADP19/21055 4DX KONTROL INSTRUMEN AREA FDF B
11

ADP19/21056 4DX KONTROL INSTRUMEN AREA COAL FEEDER C
12

ADP19/21057 4DX KONTROL INSTRUMEN AREA MILL C
13

ADP19/21058 4DX KONTROL INSTRUMEN AREA TBS A
14

ADP19/21059 4DX KONTROL INSTRUMEN AREA TBS B
15

ADP19/21060 4DX KONTROL INSTRUMEN AREA TBS C
16

ADP19/21061 4DX KONTROL INSTRUMEN ANALYZER AREA CPP
17

ADP19/20715 (AC) SERVICE RUTIN AC STANDING FLOOR AREA TURBIN MCC
18

ADP19/20716 (AC) SERVICE RUTIN AC STANDING FLOOR AREA CLORINT PLANT ELECTRIC ROOM
19
ADP19/20717 (AC) SERVICE RUTIN AC SPLIT AREA PANTRY
- Problem :
20 - Actual Action : Parameter CWP A
level oil = 75
Press out cwp = 0.141 mpa
NO. PEKERJAAN/TEMUAN Perss inlet colling = 0.48 mpa FEEDBACK
Press lubricating = 0.214 mpa
Press Hyd = 13.5 mpa
Power supply in : 231 v ac
Power suply out rectifier = 23.7 v dc

Catatan
1.cwp a dalam kondisi beroprasi lampu indikator normal dan tidak ada error
-2.tidak
Problemada: kebocoran di line hydrolic nya
-3.PLC
Actual ActionRun
kondisi :
1 4DX mill C - Hasil Akhir :
I/O yang actif
- Summary
DI = 5 :
DO = 0 dan 7
Relay actif =
220 v ac = nomer 4.
24 V DC = Nomer 1,5 dan 6

PS sudah di cek normal serta di lakukan pelumasan pada switch

Parameter CWP B
level oil = 80
Press out cwp = 0,155 mpa
Perss inlet colling = 0.48 mpa
Press lubricating = 0.214 mpa
Press Hyd = 11.5mpa
Power supply in = 231.7 v ac
Power supply out rectifirr = 23.7

Catatan
2 Pm dan 4dx cwp A, B, C 1.cwp b dalam kondisi beroprasi. lampu indikator normal dan tidak ada error
2. Tidak ada kebocoran di line hudraulic nya
3.PLC kondisi Run
I/O yang actif
DI = 5
DO = 0 dan 7
Relay activ =
220 v ac = nomer 1.
24 V DC = Nomer 2.5 dan 6
PS sudah di cek normal serta di lakukan pelumasan pada switch

Parameter CWP C
level oil = 65
Press out cwp = 0.mpa
Perss inlet colling = 0.48 mpa
Press lubricating = 0.214 mpa
Press Hyd = 14 mpa
Power supply in =230.9 v ac
Power supply out rectifier = 23.83 v dc
Catatan
1.cwp C dalam kondisi stop, lampu indikator normal dan tidak ada error
2. kebocoran oil HYD di conector solenoid slowly close saat kondisi cwp stop tidak ada
3.PLC kondisi Run
I/O yang actif
DI = 6
DO :Q1 = 0
Relay actif =
220 v ac = nomer 1
24 V DC = Nomer 3 dan 5

PS sudah di cek normal serta di lakukan pelumasan pada switch


- Hasil Akhir :
- Summary :
- Penyebab :
- Actual Action : 1.TBS A Running
. Level in tbs: 7.6 m
. Level out tbs : 7.6 m
. Level in trash car :7.57 m
. Posisi mov water spray tbs open 100%
. Limit switch jump buth secara visual norml
. Limit switch chain draw secara visual normal
2. TBS B Running
. Level in tbs: 7.6 m
. Level out tbs : 7.5m
3 4Dx TBS a.b dan c . Level in trash car : 6.3m
. Posisi mov water spray tbs open 100%
. Limit switch jump buth secara visual norml
. Limit switch chain draw secara visual normal
TBS C Standby
. Level in tbs: 7.6 m
. Level out tbs : 7.55 m
. Level in trash car :7.6 m
. Posisi mov water spray tbs closed 0%
. Limit switch jump buth secara visual norml
. Limit switch chain draw secara visual normal
- Hasil Akhir :
- Summary :

- Problem :
- Penyebab :
Temuan mov spray water trash - Actual Action :
car tidak bisa open/closed - Hasil Akhir :
- Summary :

- Problem :
- Penyebab :
- Actual Action : 1.Solenoid draine SIO2 rusak
4dx analyzer sampling cpp 2.solenoid inlet sampel 2 tidak keluar air pas i On
3.tempwratur display water sampling banyak yng rusak
- Hasil Akhir :
- Summary :

- Problem :
- Penyebab :
Penggantian handle manual valve - Actual Action :
untuk PI purified pond 2 wwtp - Hasil Akhir :
- Summary :

- Problem :
Kalibrasi coal feeder A - Penyebab :
- Actual Action :
- Summary :
Utk Fuse sumber power lampu
dan steker swaktu cleaning smpet - Problem :
trip di cek fuse paling kanan , - Penyebab :
dicek putus fuse 2A . Krn stok tdk - Actual Action : Mash aman d lakukan penggantian
ad dignti swap stok yg d lab 4A . - Summary :
Spec MCB jg C10 berarti 10A

- Problem :
Cleaning Internal panel , terminal - Penyebab :
, board sisi dalam Coal feeder A sb -grease
Actual Action : Temuan Roller utk coal feeder terlihat aga seret utk berputar . Mekanik rifa akan
pada bearing roller (melalui inject grease di hole tnda panah merah)
kalibrasi - Hasil Akhir :
- Summary :

Blow line PA pressure A info - Problem :


swaktu. Running nilai lbh rndah - Penyebab :
dibanding mill lainnya . (3Kpa) yg - Actual Action :
lain 6-7Kpa) dan jg blow line PA - Hasil Akhir :
flow - Summary :

- Problem :
- Penyebab :
PM generator sealing oil sistem - Actual Action :
- Hasil Akhir :
- Summary :

- Problem :
- Penyebab :
4DX FDF A - Actual Action :
- Hasil Akhir :
- Summary :

- Problem :
- Penyebab :
4DX FDF B - Actual Action :
- Hasil Akhir :
- Summary :
- Problem :
- Penyebab :
Setting jaringan komputer PC - Actual Action :
- Hasil Akhir :
- Summary :

- Problem :
Sudah di siapkan untuk dudukan - Penyebab :
limit swit outlet mill A no 4 yang - Actual Action :
kropos. - Hasil Akhir :
- Summary :

- Problem :
- Penyebab :
Penataan belakang kontener... - Actual Action :
- Hasil Akhir :
- Summary :

- Problem :
- Penyebab :
- Actual Action :
- Hasil Akhir :
- Summary :

- Problem :
- Penyebab :
- Actual Action :
- Summary :

Mengetahui,

I Gede Sukma S.R


Project Leader I & C
NANCE OUTAGE
TROL UNIT BOP
ENG 2 ADIPALA

TANGGAL : Kamis /12 September 2019


HARI ke- : 12

GIATAN

MANPOWER

EKERJAAN DAN PERSENTASE PROGRESS


(%)
WO STATUS
PROGRESS

PM 100% close

PM 100% close

PM 100% close

PM 100% close

PM 100% close
PM 100% close

PM 100% close

PM 100% close

CD 100% close

S 100% close

S 100% close

S 100% close

S 100% close

S 100% close

S 100% close

S 100% close

S 100% close

S 100% close

S 100% close
S 100% close

ada error

ada error

error
cwp stop tidak ada
berputar . Mekanik rifa akan menambhkn
merah)
Dilaporkan Oleh,

Andika Respati . F
Pengawas Lapangan I & C
WORK TYPE

EKSEKUTOR

Tito, Haris

Tito, Haris

Tito, Haris

Heriyanto, Adit

Feri, Imam, Endra, Ade


Feri, Imam, Endra, Ade

Feri, Imam, Endra, Ade

Tito, Haris

Feri, Imam, Endra, Ade

Sugiyono, Aji

Sugiyono, Aji

Heriyanto, Adit

Sugiyono, Aji

Feri, Imam, Endra, Ade

Feri, Imam, Endra, Ade

Feri, Imam, Endra, Ade

Feri, Imam, Endra, Ade


LAPORAN KEGIATAN HARIAN MAINTENANCE OUTAGE
PEMELIHARAAN INSTRUMEN DAN KONTROL UNIT BOP
PT. INDONESIA POWER UJP PLTU JATENG 2 ADIPALA

LOKASI KERJA : PLTU ADIPALA


CUACA : CERAH

NO. URAIAN KEGIATAN


1
2
3
4
5
6
7
8
MANPOWER
Project Leader IC : I Gede Sukma SR
Pengawas Lap. IC : Andika Respati Firdaus
Teknisi : Ahmad syifaul, Adhana Tito, Sugiyono, Heriyanto, Feri, Imam
Asisten Teknisi : Adit, Endra, Harris, Aji, Ade
Rendal Har IC : Prawira Sakti
Admin Har IC : Anisa Apriliawati

DETAIL PEKERJAAN DAN PERSENTA

NO. URAIAN KEGIATAN


ADP19/20721 (AC) SERVICE RUTIN AC STANDING FLOOR AREA R WWTP MCC

ADP19/22056 CE (Unit) Penggantian Solenoid valve pada Outlet Mill A No.1 (rusak)
2

ADP19/20718 (AC) SERVICE RUTIN AC STANDING FLOOR UNIT A DAN UNIT B AREA TEST RUNNI
3 NG OFFICE
ADP19/20719 (AC) SERVICE RUTIN AC SPLIT UNIT A DAN UNIT B AREA ELECTRIC CCR / BOILER EL
ECTRONIC
4

ADP19/20720 (AC) SERVICE RUTIN AC STANDING FLOOR AREA LAB. PROXIMATE ULTIMATE
5
ADP19/21301 4DX KONTROL INSTRUMEN AREA COAL FEEDER E
6

ADP19/21302 4DX KONTROL INSTRUMEN AREA MILL E
7

ADP19/21303 4DX KONTROL INSTRUMEN AREA IGNITER OF BURNER LEVEL C
8

ADP19/21304 4DX KONTROL INSTRUMEN AREA PLC PURIFYING
9

ADP19/21305 4DX KONTROL INSTRUMEN AREA CWP A
10

ADP19/21306 4DX KONTROL INSTRUMEN AREA CWP B
11

ADP19/21307 4DX KONTROL INSTRUMEN AREA CWP C
12

ADP19/21308 4DX KONTROL INSTRUMEN ANALYZER AREA SAMPLING RACK
13

ADP19/21925 AC (BOP) AC Split di Ruangan Instrumentasi Laboratorium Lt 2 Rusak
14

ADP19/21992 (unit) Dudukan limit switch indikasi open untuk outlet damper Milll A no A4 koros
i parah
15

NO. PEKERJAAN/TEMUAN FEEDBACK

Penggantian dudukan limit swit - Problem :


- Actual Action :
1 outlet dumper mill A no 4 sisi - Hasil Akhir :
open - Summary :

- Problem :
Follow fendor mekanik Cek Dew - Actual Action :
2 point Combined dryer - Hasil Akhir :
- Summary :
- Penyebab :
- Actual Action : Hasil pengecekan PLC purifaying
▪power supply 224 AC dan supply output 23,9 DC
▪Terdapat alarm eror b pada modul CRA
3 4DX PLC PURIFAYING ▪Fan panel normal
▪Untuk suhu ruangan 20°C
Limit swith outlet mill A4 finish,
- Hasil Akhir :
- Summary :

- Problem :
- Penyebab :
Limit swith outlet mill A4 finish, - Actual Action :
- Hasil Akhir :
- Summary :

- Problem :
Penggantian dudukan limit swith - Penyebab :
dan penggantian limit swit nya.
Limit swit nya di ganti karna rusak - Actual Action :
juga. Finish - Hasil Akhir :
- Summary :

- Problem : Setting flow water smpling dan cleaning senaor PH


Alarm pada PH main steam
Displau DO dearator otl rusak
Pembacaan DO inlt dearator yerlalu tinggi, (sensor udah jenuh)
Unk SIO2 skrg sudah tidak mncul smple missing 1
Pembacaan temp abnormal. 1. C3w system header, boiler start up water colecting tank, dan hp
4dx analizer sampling rack Ada alarm p2 < 5xp1 pada Na main steam (perlu kalibrasi)

- Penyebab :
- Actual Action :
- Hasil Akhir :
- Summary :

- Problem :
4dx igniter of burner level C - Penyebab :
- Actual Action :
- Summary :

- Problem :
- Penyebab :
- Actual Action : Belt tention masih senter
Density :706
4DX COAL FEEDER E Rate : 69.9
Rpm : 989
Alarm :maintenance
- Summary :
- Actual Action :Parameter CWP A
level oil = 75
Press out cwp = 0.141 mpa
Perss inlet colling = 0.48 mpa
Press lubricating = 0.214 mpa
Press Hyd = 13.5 mpa
Power supply in : 231 v ac
Power suply out rectifier = 23.7 v dc

Catatan
1.cwp a dalam kondisi beroprasi lampu indikator normal dan tidak ada error
-2.tidak
Problemada: kebocoran di line hydrolic nya
-3.PLC
Penyebab
kondisi : Run
4DX Mill E - Actual
I/O yang actif:
Action
- Hasil
DI =Akhir
5 :
- Summary :
DO = 0 dan 7
Relay actif =
220 v ac = nomer 4.
24 V DC = Nomer 1,5 dan 6

PS sudah di cek normal serta di lakukan pelumasan pada switch

Parameter CWP B
level oil = 80
Press out cwp = 0,155 mpa
Perss inlet colling = 0.48 mpa
Press lubricating = 0.214 mpa
Press Hyd = 11.5mpa
Power supply in = 231.7 v ac
Power supply out rectifirr = 23.7

4DX CWP ABC Catatan


1.cwp b dalam kondisi beroprasi. lampu indikator normal dan tidak ada error
2. Tidak ada kebocoran di line hudraulic nya
3.PLC kondisi Run
I/O yang actif
DI = 5
DO = 0 dan 7
Relay activ =
220 v ac = nomer 1.
24 V DC = Nomer 2.5 dan 6
PS sudah di cek normal serta di lakukan pelumasan pada switch

Parameter CWP C
level oil = 65
Utk progres penarikan dan laying Press out cwp = 0.mpa
- Problem
kabel REOC ethernet selesai. Stlh Perss inlet:colling = 0.48 mpa
-Press
Penyebab :
lubricating = 0.214 mpa
dilakukan remote Server EDS 1 . - Actual Action
sementara kabel disconect dr Press Hyd = 14 :mpa
Info dr pa imam akan dlanjutlan pekerjaannya dr tim ktr pusat
server EDS dulu menunggu tim ktr -Power
Hasil Akhir
supply: in =230.9 v ac
pusat dtg utk konfigurasi - Summary
Power : out rectifier = 23.83 v dc
supply
Catatan
1.cwp C dalam kondisi stop, lampu indikator normal dan tidak ada error
2. kebocoran oil HYD di conector solenoid slowly close saat kondisi cwp stop tidak ada
Mengetahui, 3.PLC kondisi Run
I/O yang actif
DI = 6
DO :Q1 = 0
Relay actif =
I Gede Sukma S.R 220 v ac = nomer 1
Project Leader I & C 24 V DC = Nomer 3 dan 5

PS sudah di cek normal serta di lakukan pelumasan pada switch


- Hasil Akhir :
- Summary :
NANCE OUTAGE
TROL UNIT BOP
ENG 2 ADIPALA

TANGGAL : Jumat /13 September 2019


HARI ke- : 13

GIATAN

MANPOWER

EKERJAAN DAN PERSENTASE PROGRESS


(%)
WO STATUS
PROGRESS

S 100% close

CD???? 100% close

S 100% close

S 100% close

S 100% close
S 100% close

S 100% close

S 100% close

S 100% close

S 100% close

S 100% close

S 100% close

S 100% close

CM 100% close

CD 100% close
ater colecting tank, dan hph 7 draine
ada error

ada error

m ktr pusat

error
cwp stop tidak ada
Dilaporkan Oleh,

Andika Respati . F
Pengawas Lapangan I & C
WORK TYPE

EKSEKUTOR

Sugiyono, aji
Sugiyono, aji

Sugiyono, aji

Heriyanto, Adit

Feri, Imam, Endra, Ade

Feri, Imam, Endra, Ade

Feri, Imam, Endra, Ade

Feri, Imam, Endra, Ade

Feri, Imam, Endra, Ade

Sugiyono, aji
LAPORAN KEGIATAN HARIAN MAINTENANCE OUTAGE
PEMELIHARAAN INSTRUMEN DAN KONTROL UNIT BOP
PT. INDONESIA POWER UJP PLTU JATENG 2 ADIPALA

LOKASI KERJA : PLTU ADIPALA


CUACA : CERAH

NO. URAIAN KEGIATAN


1
2
3
4
5
6
7
8
MANPOWER
Project Leader IC : I Gede Sukma SR
Pengawas Lap. IC : Andika Respati Firdaus
Teknisi : Ahmad syifaul, Adhana Tito, Sugiyono, Heriyanto, Feri, Imam
Asisten Teknisi : Adit, Endra, Harris, Aji, Ade
Rendal Har IC : Prawira Sakti
Admin Har IC : Anisa Apriliawati

DETAIL PEKERJAAN DAN PERSENTA

NO. URAIAN KEGIATAN


ADP19/21309 4DX KONTROL INSTRUMEN AREA COAL FEEDER F

ADP19/21310 4DX KONTROL INSTRUMEN AREA MILL F
2

ADP19/21311 4DX KONTROL INSTRUMEN AREA PLC DAN PC DESAL
3
ADP19/21120 (AC) SERVICE RUTIN  AC SPLIT UNIT A DAN UNIT B AREA TURBIN ELEKTRONIK
4

ADP19/21121 (AC) SERVICE RUTIN AC SPLIT AREA COALY WASTE WATER MCC POWER
5
ADP19/22122 Pengecekan peralatan instrumen dan Support pekerjaan Baut LP control valve BF
PT B kendor
6

NO. PEKERJAAN/TEMUAN FEEDBACK

- Problem :
Temperatur grinding roll mill A - Actual Action :
1 sudh dinstall normal - Hasil Akhir :
- Summary :

- Problem :
2 Pemasangan rtd grinding roll mill - Actual Action :
a no 1,2dan 3 - Hasil Akhir :
- Summary :

- Penyebab :
3 4DX MILL F - Actual Action :
- Hasil Akhir :
- Summary :

- Problem :
- Penyebab :
4DX COAL FEEDER F - Actual Action : Belt Tention yang sebelah barat tertutup benda.. Tidak mengganggu masih am
- Hasil Akhir :
- Summary :

- Problem :
- Penyebab :
Pengecekan mov inlet damper - Actual Action : Pengecekan inlet MOV coal feedr D inlet setlh d coba dclose utk merapatkan su
coal feeder d switch sentuh ttp tdk tampil feedback. Terminal2 kabel jg sudh d coba kencangkn
Indikasi smpat kadang muncul keng tidk menyentuh close
- Hasil Akhir :
- Summary :

- Problem :
- Penyebab :
4DX PLC DAN PC DESALINATION - Actual Action :
PLANT
- Hasil Akhir :
- Summary :

Pengecekan dan perbaikan


indikasi PS LO PRESS NORMAL - Problem :
MILL C yang tidak - Penyebab :
nunjuk....dilakukan pengencangan - Actual Action : Di pindah dari no 4 ke nomer 3,Karna terminal rusak yg no 4
dan pindah terminasi... Sekarang - Summary :
sudah normal
Pengencangn baut LP contrl valve
BFPT A dng mekanik hingga
mencapai tanda marker garis
putih yg infony emkanik pernh
ditandai d th 2018 . Pembukaan - Problem :
dng beban 430an sbesar 58%.. utk -- Penyebab :
Actual Action :
setting kemugkinan lbh aman saat
bfpt saat stop krn stlh diskusi dng - Summary :
operator mas agus. Krn dpt
dilihat dng loop test valve
opening 0-100%..

Mengetahui,

I Gede Sukma S.R


Project Leader I & C
NANCE OUTAGE
TROL UNIT BOP
ENG 2 ADIPALA

TANGGAL : Sabtu /14 September 2019


HARI ke- : 14

GIATAN

MANPOWER

EKERJAAN DAN PERSENTASE PROGRESS


(%)
WO STATUS
PROGRESS

S 100% close

S 100% close

S 100% close

S 100% close

S 100% close
S 100% close

dak mengganggu masih aman

a dclose utk merapatkan supaya limit


a kencangkn

k yg no 4
Dilaporkan Oleh,

Andika Respati . F
Pengawas Lapangan I & C
WORK TYPE

EKSEKUTOR

Adhana Tito, Moh.imam, Adit

Adhana Tito, Moh.imam, Adit

Adhana Tito, Moh.imam, Adit

Adhana Tito, Moh.imam, Adit

Adhana Tito, Moh.imam, Adit


Adhana Tito, Moh.imam, Adit
LAPORAN KEGIATAN HARIAN MAINTENANCE OUTAGE
PEMELIHARAAN INSTRUMEN DAN KONTROL UNIT BOP
PT. INDONESIA POWER UJP PLTU JATENG 2 ADIPALA

LOKASI KERJA : PLTU ADIPALA


CUACA : CERAH

NO. URAIAN KEGIATAN


1
2
3
4
5
6
7
8
MANPOWER
Project Leader IC : I Gede Sukma SR
Pengawas Lap. IC : Andika Respati Firdaus
Teknisi : Ahmad syifaul, Adhana Tito, Sugiyono, Heriyanto, Feri, Imam
Asisten Teknisi : Adit, Endra, Harris, Aji, Ade
Rendal Har IC : Prawira Sakti
Admin Har IC : Anisa Apriliawati

DETAIL PEKERJAAN DAN PERSENTA

NO. URAIAN KEGIATAN


ADP19/21312 4DX KONTROL INSTRUMEN AREA IGNITER OF BURNER LEVEL D

ADP19/21313 4DX KONTROL INSTRUMEN AREA PLC WWTP
2

NO. PEKERJAAN/TEMUAN FEEDBACK

- Problem :
Utk SR infonya yg kendor BFPT B - Actual Action :
1 padahal aktual temuan baut LP yg - Hasil Akhir :
kendor BFPT A
- Summary :
- Problem :
2 Cek patrol turbin elektrik room - Actual Action : Temuan alarm external
- Hasil Akhir :
- Summary :

- Penyebab :
3 Perbaikan mov inlet coal feeder D - Actual Action : Inlet Damper MOV CF D sudah Close.. Dilakukan Setting Limit Close pada MOV
- Hasil Akhir :
- Summary :

- Problem :
- Penyebab :
4DX Burner Level D - Actual Action :
- Hasil Akhir :
- Summary :

- Problem :
- Penyebab :
4dx plc wwtp - Actual Action :
- Hasil Akhir :
- Summary :

- Problem :
- Penyebab :
- Actual Action :Alarm external
Cek patrol boiler elektrik room Alarm pada PAF A

- Hasil Akhir :
- Summary :

- Problem :
Pemasangan kabel proximity - Penyebab :
debris B - Actual Action :
- Summary :

Mengetahui,

I Gede Sukma S.R


Project Leader I & C
NANCE OUTAGE
TROL UNIT BOP
ENG 2 ADIPALA

TANGGAL : Minggu /15 September 2019


HARI ke- : 15

GIATAN

MANPOWER

EKERJAAN DAN PERSENTASE PROGRESS


(%)
WO STATUS
PROGRESS

S 100% CLOSE

S 100% CLOSE
tting Limit Close pada MOV

Dilaporkan Oleh,

Andika Respati . F
Pengawas Lapangan I & C
WORK TYPE

EKSEKUTOR

Andika, Heriyanto, Haris, Ade

Andika, Heriyanto, Haris, Ade


LAPORAN KEGIATAN HARIAN MAINTENANCE OUTAGE
PEMELIHARAAN INSTRUMEN DAN KONTROL UNIT BOP
PT. INDONESIA POWER UJP PLTU JATENG 2 ADIPALA

LOKASI KERJA : PLTU ADIPALA


CUACA : CERAH

NO. URAIAN KEGIATAN


1
2
3
4
5
6
7
8
MANPOWER
Project Leader IC : I Gede Sukma SR
Pengawas Lap. IC : Andika Respati Firdaus
Teknisi : Ahmad syifaul, Adhana Tito, Sugiyono, Heriyanto, Feri, Imam
Asisten Teknisi : Adit, Endra, Harris, Aji, Ade
Rendal Har IC : Prawira Sakti
Admin Har IC : Anisa Apriliawati

DETAIL PEKERJAAN DAN PERSENTA

NO. URAIAN KEGIATAN


ADP19/21531 4DX KONTROL INSTRUMEN AREA COAL FEEDER B

ADP19/21532 4DX KONTROL INSTRUMEN AREA MILL B
2

ADP19/21533 4DX KONTROL INSTRUMEN AREA DCS CPP
3
ADP19/21534 4DX KONTROL INSTRUMEN AREA PLC WWTP
4

ADP19/21906 (AC) (BOP) Terdapat kebocoran Line Freon untuk AC di Lab Tribology dan DGA BO
P Building Lt 2
5
ADP19/21139 PEMELIHARAAN RUTIN INSTRUMEN 2ND STAGE RO HPP A  (4 MINGGUAN)
6

ADP19/21140 PEMELIHARAAN RUTIN INSTRUMEN 2ND STAGE RO HPP B  (4 MINGGUAN)
7

ADP19/21141 PEMELIHARAAN RUTIN INSTRUMEN WATER SUPPLY PUMP A  (4 MINGGUAN)
8

ADP19/21142 PEMELIHARAAN RUTIN INSTRUMEN WATER SUPPLY PUMP B  (4 MINGGUAN)
9

ADP19/21146 PEMELIHARAAN RUTIN INSTRUMEN PULVERIZER/MILL A  (4 MINGGUAN)
10

ADP19/21147 PEMELIHARAAN RUTIN INSTRUMEN PULVERIZER/MILL B  (4 MINGGUAN)
11

ADP19/21148 PEMELIHARAAN RUTIN INSTRUMEN PULVERIZER/MILL C  (4 MINGGUAN)
12

ADP19/21150 PEMELIHARAAN RUTIN INSTRUMEN PULVERIZER/MILL D  (4 MINGGUAN)
13

ADP19/21151 PEMELIHARAAN RUTIN INSTRUMEN PULVERIZER/MILL E  (4 MINGGUAN)
14

ADP19/21152 PEMELIHARAAN RUTIN INSTRUMEN PULVERIZER/MILL F  (4 MINGGUAN)
15

ADP19/21153 PEMELIHARAAN RUTIN INSTRUMEN PULVERIZER/MILL A LUBE OIL PUMP  (4 MIN
GGUAN)
16

ADP19/21155 PEMELIHARAAN RUTIN INSTRUMEN PULVERIZER/MILL B LUBE OIL PUMP  (4 MIN
GGUAN)
17

ADP19/21157 PEMELIHARAAN RUTIN INSTRUMEN PULVERIZER/MILL C LUBE OIL PUMP  (4 MIN
GGUAN)
18

ADP19/21158 PEMELIHARAAN RUTIN INSTRUMEN PULVERIZER/MILL D LUBE OIL PUMP  (4 MIN
GGUAN)
19
ADP19/21160 PEMELIHARAAN RUTIN INSTRUMEN PULVERIZER/MILL E LUBE OIL PUMP  (4 MIN
GGUAN)
20

ADP19/21161 PEMELIHARAAN RUTIN INSTRUMEN PULVERIZER/MILL F LUBE OIL PUMP  (4 MIN
GGUAN)
21

ADP19/21122 (AC) SERVICE RUTIN AC STANDING FLOOR AREA TURBIN PDC /6.3kv/TURBIN PDC 
6.3kv SWITCH GEAR ROOM
22

ADP19/21123 (AC) SERVICE RUTIN AC STANDING FLOOR AREA HYDROGEN GENERATION STATIO
N MCC
23

ADP19/21124 (AC) SERVICE RUTIN AC SPLIT AREA R CUSTOMER SERVICE
24

ADP19/10077 (BOP_A)  pengantian sensor dan module DO analyzer dearator outlet (sensor rus
ak)
25

ADP19/22116 (CE) (Unit) Solenoid timer drain trap air dryer A rusak
26

ADP19/22117 (BOP) - MOV Spray selokan trash car tidak bisa dioperasikan dari lokal maupun re
mote
27

ADP19/22119 (CE) (Unit) Penunjukan PA press Mill A tidak akurat
28

NO. PEKERJAAN/TEMUAN FEEDBACK

- Problem :
- Actual Action : Untuk fan panel dcs cpp sudah normal, dilakukan pengencangan teminasi kab
Teedapat alarm external pd modul D6 & D7 panel CTRL 17/67 10CVA46 REAR
- Hasil Akhir : Hasil pengecekan DCS cpp
. Ditemuakn alarm external pada modul digital input D6 dan 7 ( CTRL 17/67 ,10CVA46 REAR)
1 4dx dcs cpp 2. Tegangan dari UPS = 226VAC1
3. Tegangan dari supply = 230 VAC
4. Tegangan output rectifier masing2 = 23,9 VDC
5. AC hidup dan temperatur 22' C
6. Fan panel sudah normal (dilakukan pengencangan terminal fan)
7. Kondisi grounding aman
- Summary :
- Problem :
Pengecekan mov cwp outlet to - Actual Action : Sudah dilakukan setting open/ closed valve masih blm bisa diopen/ closed da
2 trash remover trench flushing dan ada indikasi valve leaktro ,untuk sementara pengopoprasian menggunakan manual valve
water - Hasil Akhir :
- Summary :

- Penyebab :
- Actual Action : Parameter Coal Feeder Mill B

Den 708
3 4DX COAL FEEDER B Rate 60.8
Rpm 868
Alarm : Maintaince
- Hasil Akhir :
- Summary :

Pekerjaan perbaikan indikasi


hunting coal flame Burner no C5 , - Problem :
dilakukan setting flange baut dan -- Penyebab :
Actual Action : Saat ini indikasi sudh mulai normal tdk huntting
meggerakkan hingga kedipan led - Hasil Akhir :
sensor normal. Kmubgkinan posisi - Summary :
optik tidak pas.

- Problem :
Patrol check di boiler electronic - Penyebab :
room . Temp normal . Boiler - Actual Action : Alarm external pada modul D7 panel CTRL 6/56
leackage. Normal - Hasil Akhir :
- Summary :

- Problem :
- Penyebab :
PM LOP MILL A-F. - Actual Action :
- Hasil Akhir :
- Summary :

- Problem :
Pm MILL A - F - Penyebab :
- Actual Action :
- Summary :

- Problem :
- Penyebab :
4dx dcs chlorine - Actual Action :
- Summary :
- Problem :
- Penyebab :
Pm water supply pump a dan b - Actual Action :
- Hasil Akhir :
- Summary :

- Problem :
- Penyebab :
4DX area Mill B. - Actual Action :
- Hasil Akhir :
- Summary :

- Problem :
Panel seolenoid pyrit sudah mulai - Penyebab :
mengelupas cat nya
Panel LOP dan Hop area mill udah - Actual Action :
mulai rapuh - Hasil Akhir :
- Summary :

- Problem : Ada kebocoran pada solenoid lower pyrit mill c


Dp filter LOP mill C udah tinggi, - Penyebab :
udah d smpekan ke opr unk coba - Actual Action :
change over - Hasil Akhir :
- Summary :

Penggantian selenoid valve outlet - Problem :


damper a2 untuk selenoid rusak - Penyebab :
karna valve berat ,selenoid sudah - Actual Action :
di ganti baru tes open/closed - Hasil Akhir :
lokal remot normal - Summary :

Perbaikan indikasi open dan - Problem :


closed outlet damper mill a1 dan
a3 terbalik dilakukan change - Penyebab :
- Actual Action :
kabel limit switch open dan closed - Hasil Akhir :
di box panel , untuk sekarang - Summary :
sudah normal tidak terbalik

- Problem :
- Penyebab :
Lanjut pelespasan kabel proximity - Actual Action :
debris A - Hasil Akhir :
- Summary :

Mengetahui,
Mengetahui,

I Gede Sukma S.R


Project Leader I & C
NANCE OUTAGE
TROL UNIT BOP
ENG 2 ADIPALA

TANGGAL : Senin /16 September 2019


HARI ke- : 16

GIATAN

MANPOWER

EKERJAAN DAN PERSENTASE PROGRESS


(%)
WO STATUS
PROGRESS

S 100% close

S 100% close

S 100% close

S 100% close

CD 100% close
PM 100% close

PM 100% close

PM 100% close

PM 100% close

PM 100% close

PM 100% close

PM 100% close

PM 100% close

PM 100% close

PM 100% close

PM 100% close

PM 100% close

PM 100% close

PM 100% close
PM 100% close

PM 100% close

S 100% close

S 100% close

S 100% close

CD 50% open

CD 100% close

CD 50% open

CD 100% close

engencangan teminasi kabel


A46 REAR

17/67 ,10CVA46 REAR)


blm bisa diopen/ closed dari lokal dan dcs
enggunakan manual valve
Dilaporkan Oleh,
Dilaporkan Oleh,

Andika Respati . F
Pengawas Lapangan I & C
WORK TYPE

EKSEKUTOR

Imam, Adit, Aji

Imam, Adit, Aji

Feri, Endra

Feri, Endra
Feri, Endra

Feri, Endra

Feri, Endra

Feri, Endra

Imam, Adit, Aji

Imam, Adit, Aji

Imam, Adit, Aji

Imam, Adit, Aji

Imam, Adit, Aji

Imam, Adit, Aji

Imam, Adit, Aji

Imam, Adit, Aji

Imam, Adit, Aji

Imam, Adit, Aji


Imam, Adit, Aji

Imam, Adit, Aji

Feri, Endra

Heriyanto, Adit, Haris

Feri, Endra
LAPORAN KEGIATAN HARIAN MAINTENANCE OUTAGE
PEMELIHARAAN INSTRUMEN DAN KONTROL UNIT BOP
PT. INDONESIA POWER UJP PLTU JATENG 2 ADIPALA

LOKASI KERJA : PLTU ADIPALA


CUACA : CERAH

NO. URAIAN KEGIATAN


1
2
3
4
5
6
7
8
MANPOWER
Project Leader IC : I Gede Sukma SR
Pengawas Lap. IC : Andika Respati Firdaus
Teknisi : Ahmad syifaul, Adhana Tito, Sugiyono, Heriyanto, Feri, Imam
Asisten Teknisi : Adit, Endra, Harris, Aji, Ade
Rendal Har IC : Prawira Sakti
Admin Har IC : Anisa Apriliawati

DETAIL PEKERJAAN DAN PERSENTA

NO. URAIAN KEGIATAN


ADP19/21535 4DX KONTROL INSTRUMEN AREA TURBINE ELECTRONIC ROOM

ADP19/21536 4DX KONTROL INSTRUMEN AREA PEDESTAL TURBINE, BFPT A & B, EH OIL
2

ADP19/21592 4DX KONTROL INSTRUMEN AREA COAL FEEDER D
3
ADP19/21593 4DX KONTROL INSTRUMEN AREA MILL D
4

ADP19/21186 (AC) SERVICE RUTIN AC STANDING FLOOR UNIT A DAN UNIT B AREA CCR BOP
5
ADP19/21187 (AC) SERVICE RUTIN AC SPLIT AREA LAB. PROXIMATE ULTIMATE
6

ADP19/21137 PEMELIHARAAN RUTIN INSTRUMEN SEAWATER FEED PUMP NO.1   (4 MINGGUA
N)
7

ADP19/21163 PEMELIHARAAN RUTIN INSTRUMEN IGNITER OF BURNER LEVEL C   (4 MINGGUAN
)
8

ADP19/21164 PEMELIHARAAN RUTIN INSTRUMEN IGNITER OF BURNER LEVEL A  (4 MINGGUAN)
9

ADP19/21165 PEMELIHARAAN RUTIN INSTRUMEN IGNITER OF BURNER LEVEL F  (4 MINGGUAN)
10

ADP19/21166 PEMELIHARAAN RUTIN INSTRUMEN IGNITER OF BURNER LEVEL D  (4 MINGGUAN)
11

ADP19/21167 PEMELIHARAAN RUTIN INSTRUMEN IGNITER OF BURNER LEVEL B  (4 MINGGUAN)
12

ADP19/21168 PEMELIHARAAN RUTIN INSTRUMEN IGNITER OF BURNER LEVEL E  (4 MINGGUAN)
13

ADP19/21175 PEMELIHARAAN RUTIN INSTRUMEN MOTORIZED BOILER FEED PUMP (MBFP)  (4 
MINGGUAN)
14

ADP19/21177 PEMELIHARAAN RUTIN INSTRUMEN BOOSTER PUMP A FOR BOILER FEED PUMP T
URBINE A (BFPT A)  (4 MINGGUAN)
15

ADP19/21178 PEMELIHARAAN RUTIN INSTRUMEN BOOSTER PUMP B FOR BOILER FEED PUMP T
URBINE B (BFPT B)  (4 MINGGUAN)
16

ADP19/21181 PEMELIHARAAN RUTIN INSTRUMEN SCREEN WASH PUMP 1  (4 MINGGUAN)
17

ADP19/21182 PEMELIHARAAN RUTIN INSTRUMEN SCREEN WASH PUMP 2  (4 MINGGUAN)
18

ADP19/21183 PEMELIHARAAN RUTIN INSTRUMEN SCREEN WASH PUMP 3  (4 MINGGUAN)
19
ADP19/22196 CE (unit) Flame Intensity Mill C1 indikasi Hunting
20

ADP19/22197 (unit) Flame Intensity Mill C5 indikasi Hunting
21

ADP19/22202 (CE)
(Unit) Indikasi press NORMAL LOP Mill C tidak muncul walaupun LOP Mill C sudah
22  running

NO. PEKERJAAN/TEMUAN FEEDBACK

- Problem :
- Actual Action :
1 4DX mill D - Hasil Akhir :
- Summary :

- Problem :
2 Pm seawater feed pump 1 dan 2 -- Actual Action :
Hasil Akhir :
- Summary :

- Penyebab : Plafond ada yg jebol


Temuan Alarm E pada modul DCS A3.
Temuan Kipas panel tdk ada besi pengaman.
3 4dx dan cek patrol turbin elektrik Terdapat alarm E pd modul B5 dan A2 pd panel EXT 11-2 10CVA27 FRONT
room
- Actual Action : Untuk modul vibrasi normal tdk ada alarm
Ruanagan bersih
- Hasil Akhir :
- Summary :

- Problem : Kaki2 panel pengoprasian filter SWP 2 dan 3 rapuh dan berkarat
Ini panel nya juga udah rapuh dan berkarat no 2 dan 3
udah mulai jatuh sndri2
Engsel pintu panel pengoprasian filter SWP 2 rusak
PI DP inlet otl filter SWP 2 dan 3 tidak akurat
Pi otl fikter swp 1 kemasukan air
Pm SWP 1 2 dan 3 Handle manual valve mov draine swp 3 tidak ada
Kaca display mov draine swp tidak jelas / berkerak no 1 2 fan 3
- Penyebab :
- Actual Action :
- Hasil Akhir :
- Summary :
- Problem :
- Penyebab :
4DX CF D - Actual Action :
- Hasil Akhir :
- Summary :

- Problem :
- Penyebab :
PM igniter - Actual Action :
- Hasil Akhir :
- Summary :

- Problem :
Lanjut perbaikan mov cwp outlet - Penyebab :
to trash remover trench filter - Actual Action : Temuan kabel untuk power motor lepas dan banyak kabel yg kendor, sudah d
water pengencangan dan setting open/closed,test open lokal/remot normal
- Summary :

- Problem :
PM area MBFP. - Penyebab :
- Actual Action :
- Summary :

- Problem :
Pelepasan Kabel Terminasi motor - Penyebab :
- Actual Action :
Seal air fan B. - Hasil Akhir :
- Summary :

- Problem :
- Penyebab :
Area pedestal bfpt - Actual Action :
- Hasil Akhir :
- Summary :
- Problem :
- Penyebab :
4dx area pedestal turbin - Actual Action :
- Hasil Akhir :
- Summary :

- Problem :
- Penyebab :
Pemasangan sensor motor SAF - Actual Action : Di bongkar maning, lubang box power supply kekecilan
- Hasil Akhir :
- Summary :

- Problem :
Pemasangan kabel proximity - Penyebab :
- Actual Action :
debris A - Hasil Akhir :
- Summary :

Mengetahui,

I Gede Sukma S.R


Project Leader I & C
NANCE OUTAGE
TROL UNIT BOP
ENG 2 ADIPALA

TANGGAL : Selasa /17 September 2019


HARI ke- : 17

GIATAN

MANPOWER

EKERJAAN DAN PERSENTASE PROGRESS


(%)
WO STATUS
PROGRESS

S 100% close

S 100% close

S 100% close

S 100% close

S 100% close
S 100% close

PM 100% close

PM 100% close

PM 100% close

PM 100% close

PM 100% close

PM 100% close

PM 100% close

PM 100% close

PM 100% close

PM 100% close

PM 100% close

PM 100% close

PM 100% close
CD 100% close

CD 100% close

CD 100% close

ONT

erkarat
k kabel yg kendor, sudah di lakukan
al
ilan

Dilaporkan Oleh,

Andika Respati . F
Pengawas Lapangan I & C
WORK TYPE

EKSEKUTOR

Imam, Adit, Haris, Endra

Imam, Adit, Haris, Endra

Imam, Adit, Haris, Endra

Sugiyono, Aji

Sugiyono, Aji
Sugiyono, Aji

Imam, Adit, Haris, Endra

Imam, Adit, Haris, Endra

Imam, Adit, Haris, Endra

Imam, Adit, Haris, Endra

Imam, Adit, Haris, Endra

Imam, Adit, Haris, Endra

Imam, Adit, Haris, Endra

Imam, Adit, Haris, Endra

Imam, Adit, Haris, Endra

Imam, Adit, Haris, Endra

Imam, Adit, Haris, Endra

Imam, Adit, Haris, Endra

Imam, Adit, Haris, Endra


Sugiyono, Aji

Sugiyono, Aji

Sugiyono, Aji
LAPORAN KEGIATAN HARIAN MAINTENANCE OUTAGE
PEMELIHARAAN INSTRUMEN DAN KONTROL UNIT BOP
PT. INDONESIA POWER UJP PLTU JATENG 2 ADIPALA

LOKASI KERJA : PLTU ADIPALA


CUACA : CERAH

NO. URAIAN KEGIATAN


1
2
3
4
5
6
7
8
MANPOWER
Project Leader IC : I Gede Sukma SR
Pengawas Lap. IC : Andika Respati Firdaus
Teknisi : Ahmad syifaul, Adhana Tito, Sugiyono, Heriyanto, Feri, Imam
Asisten Teknisi : Adit, Endra, Harris, Aji, Ade
Rendal Har IC : Prawira Sakti
Admin Har IC : Anisa Apriliawati

DETAIL PEKERJAAN DAN PERSENTA

NO. URAIAN KEGIATAN


ADP19/14198 (AC) HVAC MCC Room Blower Fan indoor Noise

ADP19/21594 4DX KONTROL INSTRUMEN AREA IDF A
2

ADP19/21595 4DX KONTROL INSTRUMEN AREA IDF B
3
ADP19/21596 4DX KONTROL INSTRUMEN AREA COAL FEEDER F
4

ADP19/21597 4DX KONTROL INSTRUMEN AREA MILL F
5
ADP19/21598 4DX KONTROL INSTRUMEN AREA DCS CHLORIN
6

ADP19/21599 4DX KONTROL INSTRUMEN AREA CWP A
7

ADP19/21713 4DX KONTROL INSTRUMEN AREA CWP B
8

ADP19/21714 4DX KONTROL INSTRUMEN AREA CWP C
9

ADP19/21188 (AC) SERVICE RUTIN  AC STANDING FLOOR AREA BOILER MCC
10

ADP19/21189 (AC) SERVICE RUTIN  AC STANDING FLOOR AREA EMERGENCY SWITCH GEAR ROO
M / ESSENTIAL BOARD POWER DISTRIBUTION (PDC)
11

ADP19/21190 (AC) SERVICE RUTIN AC STANDING FLOOR UNIT A, UNIT B DAN UNIT C AREA PORT
ABLE CLORINT PLANT RECTIFIER TRANSFORMER
12

ADP19/21138 PEMELIHARAAN RUTIN INSTRUMEN SEAWATER FEED PUMP NO.2   (4 MINGGUA
N)
13

ADP19/21143 PEMELIHARAAN RUTIN INSTRUMEN BOILER SUPERHEATER STEAM & DESUPERHE
ATER WATER CONTROL SYSTEM  (4 MINGGUAN)
14

ADP19/21162 PEMELIHARAAN RUTIN INSTRUMEN BOILER WIND BOX & BURNER  CONTROL SYS
TEM (4 MINGGUAN)
15

ADP19/21169 PEMELIHARAAN RUTIN INSTRUMEN PRIMARY AIR, SEAL AND SCAN AIR A CONTR
OL SYSTEM (4 MINGGUAN)
16

ADP19/21170 PEMELIHARAAN RUTIN INSTRUMEN SECONDARY AIR  CONTROL SYSTEM  (4 MING
GUAN)
17

ADP19/21171 PEMELIHARAAN RUTIN INSTRUMEN PRIMARY AIR FAN LO A/B (PAF A/B)  (4 MING
GUAN)
18

ADP19/21172 PEMELIHARAAN RUTIN INSTRUMEN  INDUCED DRAFT FAN LO A/B (IDF A/B)  (4 MI
NGGUAN)
19
ADP19/21174 PEMELIHARAAN RUTIN INSTRUMEN BOILER FLUE GAS  SIDE CONTROL SYSTEM (4 
MINGGUAN)
20

ADP19/21176 PEMELIHARAAN RUTIN INSTRUMEN BOOSTER PUMP FOR MOTORIZED BOILER FE
ED PUMP (MBFP)  (4 MINGGUAN)
21

ADP19/21180 PEMELIHARAAN RUTIN INSTRUMEN BOILER REHEATER STEAM & DEREHEATER W
ATER CONTROL SYSTEM (4 MINGGUAN)
22

ADP19/22280 (BOP_A)  Sensor DO inlet dearator pembacaan abnormal,sensor rusak
23

ADP19/22285 CE (Unit) Solenoid outlet Mill A2 broken
24

ADP19/22286 CE (Unit) Outlet Mill A1 indikasi close dan open terbalik
25

ADP19/22289 CE (Unit) Outlet Mill A3 indikasi close dan open terbalik
26

NO. PEKERJAAN/TEMUAN FEEDBACK

- Problem :
- Actual Action :
1 4DX mill F - Hasil Akhir :
- Summary :

- Problem :
- Actual Action :
2 Pm sea water feed pump a dan b - Hasil Akhir :
- Summary :

Pm boiler superheater steam dan - Penyebab :


3 desuperheater water control - Actual Action :
system - Hasil Akhir :
- Summary :
- Problem :
- Penyebab :
- Actual Action : Hasil pengecekan CWP
-CWP A RUNNING
Press outlet cwp : 0,125 Mpa
Press HPU : 13,6Mpa
Level Oil HPU : 75%
Plc HPU normal tidak ada alarm
Kebocoran oil HPU sementara tidak ada
-CWP B RUNNING
Press outlet cwp : 0,157 Mpa
4DX CWP A,B DAN C Press HPU : 12 Mpa
Level Oil HPU : 75%
Plc HPU normal tidak ada alarm
Kebocoran oil HPU sementara tidak ada
-CWP C stop
Press outlet cwp : 0,001 Mpa
Press HPU : 14 Mpa
Level Oil HPU : 70%
Plc HPU normal tidak ada alarm
Kebocoran oil HPU sementara tidak ada
- Hasil Akhir :
- Summary :

- Problem :
Pm boiler reheat steam dan - Penyebab :
dereheat water control system - Actual Action :
- Hasil Akhir :
- Summary :

- Problem :
- Penyebab :
4Dx dcs chlorin sudah di lakukan - Actual Action :
- Hasil Akhir :
- Summary :

- Problem :
Pm boiler flue gas control system - Penyebab :
- Actual Action :
- Summary :

- Problem :
Pm secondary air damper control - Penyebab :
system - Actual Action :
- Summary :
- Problem :
- Penyebab :
Pm booster pump for mbfp - Actual Action :
- Hasil Akhir :
- Summary :

- Problem :
Pengecekan temperature outlet - Penyebab :
mill B1 - Actual Action :
- Hasil Akhir :
- Summary :

- Problem :
- Penyebab :
4DX mill F - Actual Action :
- Hasil Akhir :
- Summary :

- Problem :
Sensor motor SAF B sudah finish - Penyebab :
di konek, tampilan normal semua -- Actual Action :
Hasil Akhir :
- Summary :

- Problem :
- Penyebab :
4DX IDF A, B dan PM LO IDF A dan - Actual Action :
B
- Hasil Akhir :
- Summary :

- Problem :
- Penyebab :
PM LO PAF A dan B - Actual Action :
- Hasil Akhir :
- Summary :
- Problem :
- Penyebab :
Pm scan air fan - Actual Action :
- Hasil Akhir :
- Summary :

- Problem :
- Penyebab :
4DX CF F - Actual Action :
- Hasil Akhir :
- Summary :

Mengetahui,

I Gede Sukma S.R


Project Leader I & C
NANCE OUTAGE
TROL UNIT BOP
ENG 2 ADIPALA

TANGGAL : Rabu /18 September 2019


HARI ke- : 18

GIATAN

MANPOWER

EKERJAAN DAN PERSENTASE PROGRESS


(%)
WO STATUS
PROGRESS

CD 100% close

S 100% close

S 100% close

S 100% close

S 100% close
S 100% close

S 100% close

S 100% close

S 100% close

S 100% close

S 100% close

S 100% close

PM 100% close

PM 100% close

PM 100% close

PM 100% close

PM 100% close

PM 100% close

PM 100% close
PM 100% close

PM 100% close

PM 100% close

CD 100% close

CD 100% close

CD 100% close

CD 100% close
Dilaporkan Oleh,

Andika Respati . F
Pengawas Lapangan I & C
WORK TYPE

EKSEKUTOR

Sugiyono, Aji

Sugiyono, Aji

Heriyanto, Adit, Haris

Sugiyono, Aji
Feri, Endra, Ade

Feri, Endra, Ade

Feri, Endra, Ade

Feri, Endra, Ade

Feri, Endra, Ade

Tito, Haris

Tito, Haris

Sugiyono, Aji

Sugiyono, Aji

Sugiyono, Aji

Sugiyono, Aji
Heriyanto, Adit, Haris

Tito, Haris

Tito, Haris

Feri, Endra, Ade

Heriyanto, Adit, Haris

Heriyanto, Adit, Haris

Sugiyono, Aji
LAPORAN KEGIATAN HARIAN MAINTENANCE OUTAGE
PEMELIHARAAN INSTRUMEN DAN KONTROL UNIT BOP
PT. INDONESIA POWER UJP PLTU JATENG 2 ADIPALA

LOKASI KERJA : PLTU ADIPALA


CUACA : CERAH

NO. URAIAN KEGIATAN


1
2
3
4
5
6
7
8
MANPOWER
Project Leader IC : I Gede Sukma SR
Pengawas Lap. IC : Andika Respati Firdaus
Teknisi : Ahmad syifaul, Adhana Tito, Sugiyono, Heriyanto, Feri, Imam
Asisten Teknisi : Adit, Endra, Harris, Aji, Ade
Rendal Har IC : Prawira Sakti
Admin Har IC : Anisa Apriliawati

DETAIL PEKERJAAN DAN PERSENT

NO. URAIAN KEGIATAN


ADP19/21715 4DX KONTROL INSTRUMEN AREA BOILER ELECTRONIC ROOM

ADP19/21716 4DX KONTROL INSTRUMEN AREA PAF A
2

ADP19/21717 4DX KONTROL INSTRUMEN AREA PAF B
3
ADP19/21718 4DX KONTROL INSTRUMEN AREA COAL FEEDER C
4

ADP19/21719 4DX KONTROL INSTRUMEN AREA MILL C
5
ADP19/21720 4DX KONTROL INSTRUMEN AREA IGNITER OF BURNER LEVEL C
6

ADP19/21721 4DX KONTROL INSTRUMEN AREA PLC H2 PLANT
7

ADP19/21722 4DX KONTROL INSTRUMEN AREA PLC DAN PC AUXBOL
8

ADP19/21723 4DX KONTROL INSTRUMEN ANALYZER AREA CPP
9

ADP19/21399 (AC) SERVICE RUTIN  AC STANDING FLOOR AREA BATTERY ROOM / BATTERY ROO
M UNIT
10

ADP19/21400 (AC) SERVICE RUTIN AC SPLIT AREA MUSHOLLA
11

ADP19/21401 (AC) SERVICE RUTIN AC STANDING FLOOR AREA SEA WATER PURIFICATION
12

ADP19/21135 PEMELIHARAAN RUTIN INSTRUMEN EWS, EDS & COMMUNICATION SYSTEM  (4 M
INGGUAN)
13

ADP19/21136 PEMELIHARAAN RUTIN INSTRUMEN BOILER CONTROL CABINET (4 MINGGUAN)
14

ADP19/21144 PEMELIHARAAN RUTIN INSTRUMEN BOILER LEAKAGE MONITORING DEVICE (4 MI
NGGUAN)
15

ADP19/21145 PEMELIHARAAN RUTIN INSTRUMEN AIR PREHEATER SOOT BLOWER (4 MINGGUA
N)
16

ADP19/21173 PEMELIHARAAN RUTIN INSTRUMEN  FORCED DRAFT FAN LO A/B (FDF A/B)  (4 MI
NGGUAN)
17

ADP19/21179 PEMELIHARAAN RUTIN INSTRUMEN MAIN STEAM, REHEAT STEAM  CONTROL SYS
TEM (4 MINGGUAN)
18

ADP19/21184 PEMELIHARAAN RUTIN INSTRUMEN AIR PREHEATER SOOT BLOWER A (8 MINGGU
AN)
19
ADP19/21185 PEMELIHARAAN RUTIN INSTRUMEN AIR PREHEATER SOOT BLOWER B (8 MINGGU
AN)
20

ADP19/22283 (BOP) Line Chiller Pendingin Sampling Rack CPP indikasi ngeblok Es
21

ADP19/22302 (Unit) Indikasi T1 outlet Mill B bad signal
22

ADP19/22303 (unit) Indikasi Pressure Instrument Air Compressor B bad signal
23

ADP19/22308 (BOP_C) pemindahan Monitoring analyzer Na desal ke Layar Pembacaan Online 
Monitoring analyzer Na Pada CEP Rusak
24

NO. PEKERJAAN/TEMUAN FEEDBACK

Pelepasan modul Na+ analyzer - Problem :


1 cation bed A untuk di pasangkan - Actual Action :
ke analyzer Na+ sampling rack - Hasil Akhir :
- Summary :

- Problem :
- Actual Action :
2 4dx plc dan pc auxbol - Hasil Akhir :
- Summary :

- Penyebab :
3 4dx analizyer cpp - Actual Action : Untuk silica analyzer cpp stop
- Hasil Akhir :
- Summary :

- Problem : Display temperatur analyzer cpp banyak yg rusak


Cairan sodium nitrate untuk Na+ cpp habis
Cairan diispropylamin untuk Na+ cpp tinggal sedikit
- Penyebab :
- Actual Action : Hasil pengecekan PLC dan PC H2 plant unit 1 dan 2
4dx PLC H2 PLANT ▪power supply 220 vac
▪Untuk modul sisi primer dan backup tidak ada alarm (normal)
▪Fan panel normal
▪Untuk suhu ruangan 17°C
▪ PC sementara normal tidak eror
- Hasil Akhir :
- Summary :
- Problem : Pressure otl IAC B terpantau normal dari tgl 17/09/2019 s/d sekarang. Tindakan: dila
pengecekan & Pengencangan terminasi kabel Signal P.transmitter
Pengecekan indikasi pressure IAC - Penyebab :
B bad sinyal - Actual Action :
- Hasil Akhir :
- Summary :

- Problem : Sensor DO dalamnya kotor.(Do dearator inlet)


- Penyebab :
Udah d pindah ke Na cEp. Skrg - Actual Action :
lagi proses start
- Hasil Akhir :
- Summary :

- Problem :
Pengecekan temperatue outlet - Penyebab :
mill B no 1, indikasi bad - Actual Action : Temperatur outlet mill B 1- 6 sudah normal
- Summary :

- Problem :
- Penyebab :
4DX igniter level C - Actual Action :
- Summary :

- Problem :
- Penyebab :
Pm LO STATION FDF A DAN FDF B - Actual Action :
- Hasil Akhir :
- Summary :

- Problem :
- Penyebab :
4DX PAF A - Actual Action :Selang surge masih bagus
- Hasil Akhir :
- Summary :

- Problem :
- Penyebab :
4DX PAF B - Actual Action : Selang surge masih bagus
- Hasil Akhir :
- Summary :
- Problem :
- Penyebab :
PM APH sootblower, - Actual Action : Limit swit masih normal
- Hasil Akhir :
- Summary :

- Problem :
- Penyebab :
4DX mill C - Actual Action :
- Hasil Akhir :
- Summary :

- Problem :
- Penyebab :
4DX CF C - Actual Action :
- Hasil Akhir :
- Summary :

- Problem :
- Penyebab :
Pm boiler leakage - Actual Action :
- Hasil Akhir :
- Summary :

- Problem :
- Penyebab :
Pm dan 4DX boiler elektrik room - Actual Action : Alarm external
- Hasil Akhir :
- Summary :

- Problem :
- Penyebab :
PM Area EWS EDS - Actual Action :
- Hasil Akhir :
- Summary :
Mengetahui,

I Gede Sukma S.R


Project Leader I & C
NANCE OUTAGE
TROL UNIT BOP
ENG 2 ADIPALA

TANGGAL : Kamis /19 September 2019


HARI ke- : 19

GIATAN

MANPOWER

PEKERJAAN DAN PERSENTASE PROGRESS


(%)
WO STATUS
PROGRESS

S 100% close

S 100% close

S 100% close

S 100% close

S 100% close
S 100% close

S 100% close

S 100% close

S 100% close

S 100% close

S 100% close

S 100% close

PM 100% close

PM 100% close

PM 100% close

PM 100% close

PM 100% close

PM 100% close

PM 100% close
PM 100% close

CD 100% close

CD 100% close

CD 100% close

CD 100% close
/d sekarang. Tindakan: dilakukan
Dilaporkan Oleh,

Andika Respati . F
Pengawas Lapangan I & C
WORK TYPE

EKSEKUTOR

Tito, Haris

Sugiyono, Aji

Sugiyono, Aji

Heriyanto, Adit

Sugiyono, Aji
Sugiyono, Aji

Feri, imam, Endra, Ade

Feri, imam, Endra, Ade

Feri, imam, Endra, Ade

Tito, Haris

Tito, Haris

Tito, Haris

Heriyanto, Adit

Sugiyono, Aji

Heriyanto, Adit

Sugiyono, Aji
Sugiyono, Aji

Sugiyono, Aji

Heriyanto, Adit

Feri, imam, Endra, Ade


LAPORAN KEGIATAN HARIAN MAINTENANCE OUTAGE
PEMELIHARAAN INSTRUMEN DAN KONTROL UNIT BOP
PT. INDONESIA POWER UJP PLTU JATENG 2 ADIPALA

LOKASI KERJA : PLTU ADIPALA


CUACA : CERAH

NO. URAIAN KEGIATAN


1
2
3
4
5
6
7
8
MANPOWER
Project Leader IC : I Gede Sukma SR
Pengawas Lap. IC : Andika Respati Firdaus
Teknisi : Ahmad syifaul, Adhana Tito, Sugiyono, Heriyanto, Feri, Imam
Asisten Teknisi : Adit, Endra, Harris, Aji, Ade
Rendal Har IC : Prawira Sakti
Admin Har IC : Anisa Apriliawati

DETAIL PEKERJAAN DAN PERSENTA

NO. URAIAN KEGIATAN


ADP19/21891 4DX KONTROL INSTRUMEN AREA FDF A

ADP19/21892 4DX KONTROL INSTRUMEN AREA FDF B
2

ADP19/21893 4DX KONTROL INSTRUMEN AREA COAL FEEDER A
3
ADP19/21894 4DX KONTROL INSTRUMEN AREA MILL A
4

ADP19/21896 4DX KONTROL INSTRUMEN AREA PLC PURIFYING
5
ADP19/21897 4DX KONTROL INSTRUMEN AREA TBS A
6

ADP19/21901 4DX KONTROL INSTRUMEN AREA TBS B
7

ADP19/21904 4DX KONTROL INSTRUMEN AREA TBS C
8

ADP19/21402 (AC) SERVICE RUTIN AHU AREA TURBIN ELEKTRONIK
9

ADP19/21403 (AC) SERVICE RUTIN AC STANDING FLOOR AREA R WWTP MCC
10

NO. PEKERJAAN/TEMUAN FEEDBACK

Spare part bekas yg mash bisa - Problem :


1 terpakai titipan handover dr Ge - Actual Action :
xin - Hasil Akhir :
- Summary :

- Problem :
- Actual Action : Pressure hutting
Selang masih bagus
2 4DX FDF A dan B Pressure hutting
Temperatur tangki LO FDF
Level tangki
- Hasil Akhir :
- Summary :
- Penyebab :
3 Cek patrol boiler elektrik room - Actual Action :
- Hasil Akhir :
- Summary :

- Problem :
- Penyebab :
- Actual Action : 1.TBS A beroprasi
. Level in tbs: 7.7 m
. Level out tbs : 7.56 m
. Level in trashcar :7. m
. Posisi mov water spray tbs open 100%
. Limit switch jump buth di cek visual
. Limit switch chain draw d cek visual
2.TBS B running
. Level in tbs: 7.62m
. Level out tbs : 7.46 m
4dx TBS a b dan c . Level in trashcar :7.51 m
. Posisi mov water spray tbs open 100%
. Limit switch jump buth secara visual normal
. Limit switch chain draw secara visual normal
3.TBS C stop
. Level in tbs: 7.72 m
. Level out tbs : 7.54 m
. Level in trashcar: 7.63 m
. Posisi mov water spray tbs open 0%
. Limit switch jump buth di test normal
. Limit switch chain draw di tes normal
- Hasil Akhir :
- Summary :

- Problem :
- Penyebab :
Penyiraman pohon - Actual Action :
- Hasil Akhir :
- Summary :

- Problem :
- Penyebab :
- Actual Action :Stlh kalibrasi penunjukan 3.2 ppb
Kalibrasi DO Analyzer in deaerator Na CEP stlh ganti display dan kalibrasi, skrg penunjukan normal
inlet
Alarm sample 1 missing pada SIO2 sampling rack sampe skrg tidak mncul lagi
- Hasil Akhir :
- Summary :

- Problem :
- Penyebab :
4dx mill A - Actual Action :
- Summary :
- Problem :
- Penyebab :
4dx plc purifeying - Actual Action :
- Summary :

- Problem :
- Penyebab :
Cek patrol turbine electronic - Actual Action : Alarm external
- Hasil Akhir :
- Summary :

- Problem :
- Penyebab :
Lepas sensor temperatur tayer - Actual Action :
mill D
- Hasil Akhir :
- Summary :

- Problem :
- Penyebab :
4DX CF A - Actual Action :
- Hasil Akhir :
- Summary :

Mengetahui,

I Gede Sukma S.R


Project Leader I & C
NANCE OUTAGE
TROL UNIT BOP
ENG 2 ADIPALA

TANGGAL : Jumat /20 September 2019


HARI ke- : 20

GIATAN

MANPOWER

EKERJAAN DAN PERSENTASE PROGRESS


(%)
WO STATUS
PROGRESS

S 100% close

S 100% close

S 100% close

S 100% close

S 100% close
S 100% close

S 100% close

S 100% close

S 100% close

S 100% close
mncul lagi
Dilaporkan Oleh,

Andika Respati . F
Pengawas Lapangan I & C
WORK TYPE

EKSEKUTOR

Sugiyono, Aji

Sugiyono, Aji

Heriyanto, Adit

Sugiyono, Aji

Feri, imam, Endra, Ade


Feri, imam, Endra, Ade

Feri, imam, Endra, Ade

Feri, imam, Endra, Ade


LAPORAN KEGIATAN HARIAN MAINTENANCE OUTAGE
PEMELIHARAAN INSTRUMEN DAN KONTROL UNIT BOP
PT. INDONESIA POWER UJP PLTU JATENG 2 ADIPALA

LOKASI KERJA : PLTU ADIPALA


CUACA : CERAH

NO. URAIAN KEGIATAN


1
2
3
4
5
6
7
8
MANPOWER
Project Leader IC : I Gede Sukma SR
Pengawas Lap. IC : Andika Respati Firdaus
Teknisi : Ahmad syifaul, Adhana Tito, Sugiyono, Heriyanto, Feri, Imam
Asisten Teknisi : Adit, Endra, Harris, Aji, Ade
Rendal Har IC : Prawira Sakti
Admin Har IC : Anisa Apriliawati

DETAIL PEKERJAAN DAN PERSENTA

NO. URAIAN KEGIATAN


ADP19/21913 4DX KONTROL INSTRUMEN AREA COAL FEEDER E

ADP19/21914 4DX KONTROL INSTRUMEN AREA MILL E
2

ADP19/21915 4DX KONTROL INSTRUMEN ANALYZER AREA SAMPLING RACK
3
ADP19/21404 (AC) SERVICE RUTIN  AC SPLIT UNIT A DAN UNIT B AREA RUANG OPERATOR
4

ADP19/21405 (AC) SERVICE RUTIN AC SPLIT AREA WORKSHOP
5

NO. PEKERJAAN/TEMUAN FEEDBACK


- Problem : Display do analizer deaerator outlet rusak
Pembacaan temperatur water sampling sering eror
1 4Dx analizer sampling rack Display monitoring na main steam sudah mulai redup
- Actual Action :
- Hasil Akhir : Ac sampling rack masih blm normal
- Summary :

- Problem :
Progres pembuatan greating coal - Actual Action :
2 feeder F - Hasil Akhir :
- Summary :

- Penyebab :
3 Coal feeder E - Actual Action :
- Hasil Akhir :
- Summary :

- Problem :
- Penyebab :
Coal feeder D - Actual Action :
- Hasil Akhir :
- Summary :

- Problem :
- Penyebab :
Coal feeder C - Actual Action :
- Hasil Akhir :
- Summary :

- Problem :
- Penyebab :
Coal feeder B - Actual Action :
- Hasil Akhir :
- Summary :

- Problem :
- Penyebab :
Coal feeder A - Actual Action :
- Summary :
- Problem :
4DX COAL FEEDER E - Penyebab :
- Actual Action :
- Summary :

- Problem :
- Penyebab :
4DX Area Mill E - Actual Action :
- Hasil Akhir :
- Summary :

- Problem : Mill F masih Proges.


Proges akses jalan outlet dumper - Penyebab :
Mill A-E sudah selesai. - Actual Action :
- Hasil Akhir :
- Summary :

- Problem :
- Penyebab :
Blow Line PA Flow indikasi bad - Actual Action :
Mill F trip. - Hasil Akhir :
- Summary :

- Problem :
Pemasangan RTD Grinding Roll - Penyebab :
1,2,3 Mill D Selesai. Indikasi - Actual Action : Pembacaan temperatur roller bearing mill d sudah normal
sekrang normal. - Hasil Akhir :
- Summary :

Mengetahui,

I Gede Sukma S.R


Project Leader I & C
I Gede Sukma S.R
Project Leader I & C
NANCE OUTAGE
TROL UNIT BOP
ENG 2 ADIPALA

TANGGAL : Sabtu /21 September 2019


HARI ke- : 21

GIATAN

MANPOWER

EKERJAAN DAN PERSENTASE PROGRESS


(%)
WO STATUS
PROGRESS

S 100% close

S 100% close

S 100% close

S 100% close

S 100% close
normal

Dilaporkan Oleh,

Andika Respati . F
Pengawas Lapangan I & C
Andika Respati . F
Pengawas Lapangan I & C
WORK TYPE

EKSEKUTOR

Feri Agung, Aji dinda

Feri Agung, Aji dinda

Feri Agung, Aji dinda

Feri Agung, Aji dinda

Feri Agung, Aji dinda


LAPORAN KEGIATAN HARIAN MAINTENANCE OUTAGE
PEMELIHARAAN INSTRUMEN DAN KONTROL UNIT BOP
PT. INDONESIA POWER UJP PLTU JATENG 2 ADIPALA

LOKASI KERJA : PLTU ADIPALA


CUACA : CERAH

NO. URAIAN KEGIATAN


1
2
3
4
5
6
7
8
MANPOWER
Project Leader IC : I Gede Sukma SR
Pengawas Lap. IC : Andika Respati Firdaus
Teknisi : Ahmad syifaul, Adhana Tito, Sugiyono, Heriyanto, Feri, Imam
Asisten Teknisi : Adit, Endra, Harris, Aji, Ade
Rendal Har IC : Prawira Sakti
Admin Har IC : Anisa Apriliawati

DETAIL PEKERJAAN DAN PERSENTA

NO. URAIAN KEGIATAN


ADP19/21895 4DX KONTROL INSTRUMEN AREA PLC DAN PC DESAL

ADP19/21916 4DX KONTROL INSTRUMEN AREA IGNITER OF BURNER LEVEL D
2

NO. PEKERJAAN/TEMUAN FEEDBACK

- Problem :
1 4DX igniter level D - Actual Action :
- Hasil Akhir :
- Summary :
- Problem :
2 4DX PLC dan PC desal - Actual Action :
- Hasil Akhir :
- Summary :

- Penyebab :
3 - Actual Action :
- Hasil Akhir :
- Summary :

Mengetahui,

I Gede Sukma S.R


Project Leader I & C
NANCE OUTAGE
TROL UNIT BOP
ENG 2 ADIPALA

TANGGAL : Minggu /22 September 2019


HARI ke- : 22

GIATAN

MANPOWER

EKERJAAN DAN PERSENTASE PROGRESS


(%)
WO STATUS
PROGRESS

S 100% CLOSE

S 100% CLOSE
Dilaporkan Oleh,

Andika Respati . F
Pengawas Lapangan I & C
WORK TYPE

EKSEKUTOR

Sugiyono, Ade

Sugiyono, Ade
LAPORAN KEGIATAN HARIAN MAINTENANCE OUTAGE
PEMELIHARAAN INSTRUMEN DAN KONTROL UNIT BOP
PT. INDONESIA POWER UJP PLTU JATENG 2 ADIPALA

LOKASI KERJA : PLTU ADIPALA


CUACA : CERAH

NO. URAIAN KEGIATAN


1
2
3
4
5
6
7
8
MANPOWER
Project Leader IC : I Gede Sukma SR
Pengawas Lap. IC : Andika Respati Firdaus
Teknisi : Ahmad syifaul, Adhana Tito, Sugiyono, Heriyanto, Feri, Imam
Asisten Teknisi : Adit, Endra, Harris, Aji, Ade
Rendal Har IC : Prawira Sakti
Admin Har IC : Anisa Apriliawati

DETAIL PEKERJAAN DAN PERSENTA

NO. URAIAN KEGIATAN


ADP19/21784 PEMELIHARAAN RUTIN INSTRUMEN OIL SUPPLY PUMP A  (4 MINGGUAN)

ADP19/21785 PEMELIHARAAN RUTIN INSTRUMEN OIL SUPPLY PUMP B  (4 MINGGUAN)
2

ADP19/21786 PEMELIHARAAN RUTIN INSTRUMEN OIL SUPPLY PUMP C  (4 MINGGUAN)
3
ADP19/21796 PEMELIHARAAN RUTIN INSTRUMEN LONG SOOT BLOWER LEFT SIDE BOILER  (4 M
INGGUAN)
4

ADP19/21797 PEMELIHARAAN RUTIN INSTRUMEN LONG SOOT BLOWER RIGHT SIDE BOILER  (4 
MINGGUAN)
5
ADP19/21798 PEMELIHARAAN RUTIN INSTRUMEN COAL FEEDER PULVERIZER/MILL A  (4 MINGG
UAN)
6

ADP19/21800 PEMELIHARAAN RUTIN INSTRUMEN COAL FEEDER PULVERIZER/MILL B (4 MINGG
UAN)
7

ADP19/21801 PEMELIHARAAN RUTIN INSTRUMEN COAL FEEDER PULVERIZER/MILL C (4 MINGG
UAN)
8

ADP19/21802 PEMELIHARAAN RUTIN INSTRUMEN COAL FEEDER PULVERIZER/MILL D (4 MINGG
UAN)
9

ADP19/21803 PEMELIHARAAN RUTIN INSTRUMEN COAL FEEDER PULVERIZER/MILL E (4 MINGG
UAN)
10

ADP19/21804 PEMELIHARAAN RUTIN INSTRUMEN COAL FEEDER PULVERIZER/MILL F (4 MINGG
UAN)
11

ADP19/21805 PEMELIHARAAN RUTIN INSTRUMEN BOILER FEED PUMP TURBINE A (BFPT A)  (4 
MINGGUAN)
12

ADP19/21806 PEMELIHARAAN RUTIN INSTRUMEN BOILER FEED PUMP TURBINE B (BFPT B)  (4 
MINGGUAN)
13

ADP19/22553 (CE) pergantian mouse dan keyboard di ruang EWS
14

ADP19/22555 Bon permintaan pergantian Regulator supply udara instrument F6 bocor
15

ADP19/22556 (Unit) Penggantian Limit switch outlet damper mill A
16

ADP19/21917 4DX KONTROL INSTRUMEN AREA COAL FEEDER B
17

ADP19/21918 4DX KONTROL INSTRUMEN AREA MILL B
18

ADP19/21408 (AC) SERVICE RUTIN AHU AREA CENTRALIZED CONTROL / RELAY ROOM / UPS UNI
T
19
ADP19/21409 (AC) SERVICE RUTIN AC STANDING FLOOR AREA R OIL PUMP MCC
20

ADP19/21410 (AC) SERVICE RUTIN AC SPLIT AREA R OVEN & SAMPEL BATU BARA
21

ADP19/21933 4DX KONTROL INSTRUMEN AREA DCS CPP
22

ADP19/21934 4DX KONTROL INSTRUMEN AREA PLC WWTP
23

NO. PEKERJAAN/TEMUAN FEEDBACK

- Problem :
- Actual Action :
1 PM BFPT B - Hasil Akhir :
- Summary :

- Problem :
- Actual Action :
2 PM BFPT A
- Hasil Akhir :
- Summary :

- Penyebab :
3 Patrol check boiler elektrik room - Actual Action :
- Hasil Akhir :
- Summary :

- Problem :
- Penyebab :
4DX mill B - Actual Action :
- Hasil Akhir :
- Summary :
- Problem : Alarm fault pada modul converter dcs cpp
- Penyebab :
- Actual Action : Hasil pengecekan DCS cpp
. Ditemuakn alarm external pada modul digital input D6 dan 7 ( CTRL 17/67 ,10CVA46 REAR)
2. Tegangan dari UPS = 226VAC1
3. Tegangan dari supply = 230 VAC
4DX DCS CPP 4. Tegangan output rectifier masing2 = 23,9 VDC
5. AC hidup dan temperatur 22' C
6. Fan panel normal
7. Kondisi grounding aman
- Hasil Akhir :
- Summary :

- Problem :
- Penyebab :
PM COAL FEEDER A-F - Actual Action :
- Hasil Akhir :
- Summary :

- Problem : Terdapat alarm fault CRA pada panel 00CRB01


- Penyebab :
4DX PLC WWTP - Actual Action :
- Summary :

- Problem :
PM long sootblower - Penyebab :
- Actual Action :
- Summary :

- Problem :
- Penyebab :
Pm oil supply pump A B dan C - Actual Action :
- Hasil Akhir :
- Summary :

- Problem : Alarm external


- Penyebab :
Patrol check turbine elektronik - Actual Action :
- Hasil Akhir :
- Summary :
- Problem : Rembes di packing manifold
Lp bypas running normal
- Penyebab :
Pengecekan HPU LPBYPASS - Actual Action :
- Hasil Akhir :
- Summary :

- Problem : Visual cek dulu, jangan dieksekusi krn press tinggi,Sepwrtinya line punya PDM,Online
- Penyebab :
- Actual Action : Tadi udah di cek bareng Denis Mekanik
cek connector di HPU LPbypass Yg d tandain biru (otlet pipe Motor HPU) Cuman rembes sedikit.. itupun ketika Motor running.
ya, infonya ada yang bocor Info Operator genangan Oil di HPU Oil station itu ISS Mbuang Oli disitu.. karna tidak ada penam
sementara
- Hasil Akhir :
- Summary :

Oli genangan Spray Valve LP - Problem :


Bypass. Karna tidak ada tempat - Penyebab :
pembuangan jadi ISS Mbuang di - Actual Action : Sumber Kebocoran Oli di manifold Spray valve LP bypass
- Hasil Akhir :
Bawah HPU LP bypas - Summary :

Mengetahui,

I Gede Sukma S.R


Project Leader I & C
NANCE OUTAGE
TROL UNIT BOP
ENG 2 ADIPALA

TANGGAL : Senin /23 September 2019


HARI ke- : 23

GIATAN

MANPOWER

EKERJAAN DAN PERSENTASE PROGRESS


(%)
WO STATUS
PROGRESS

PM 100% close

PM 100% close

PM 100% close

PM 100% close

PM 100% close
PM 100% close

PM 100% close

PM 100% close

PM 100% close

PM 100% close

PM 100% close

PM 100% close

PM 100% close

CD 100% close

CD 100% close

CD 100% close

S 100% close

S 100% close

S 100% close
S 100% close

S 100% close

S 100% close

S 100% close
17/67 ,10CVA46 REAR)
nya line punya PDM,Online sampling oil

pun ketika Motor running.


itu.. karna tidak ada penampungan

ypass

Dilaporkan Oleh,

Andika Respati . F
Pengawas Lapangan I & C
WORK TYPE

EKSEKUTOR

Feri, Imam, Endra, Ade

Feri, Imam, Endra, Ade

Feri, Imam, Endra, Ade

Heriyanto, Haris, Adit

Heriyanto, Haris, Adit


Sugiyono, Aji

Sugiyono, Aji

Sugiyono, Aji

Sugiyono, Aji

Sugiyono, Aji

Sugiyono, Aji

Heriyanto, Haris, Adit

Heriyanto, Haris, Adit

Tito,Haris

Sugiyono, Aji

Heriyanto, Haris, Adit

Sugiyono, Aji
Feri, Imam, Endra, Ade

Feri, Imam, Endra, Ade


LAPORAN KEGIATAN HARIAN MAINTENANCE OUTAGE
PEMELIHARAAN INSTRUMEN DAN KONTROL UNIT BOP
PT. INDONESIA POWER UJP PLTU JATENG 2 ADIPALA

LOKASI KERJA : PLTU ADIPALA


CUACA : CERAH

NO. URAIAN KEGIATAN


1
2
3
4
5
6
7
8
MANPOWER
Project Leader IC : I Gede Sukma SR
Pengawas Lap. IC : Andika Respati Firdaus
Teknisi : Ahmad syifaul, Adhana Tito, Sugiyono, Heriyanto, Feri, Imam
Asisten Teknisi : Adit, Endra, Harris, Aji, Ade
Rendal Har IC : Prawira Sakti
Admin Har IC : Anisa Apriliawati

DETAIL PEKERJAAN DAN PERSENTA

NO. URAIAN KEGIATAN


ADP19/21787 PEMELIHARAAN RUTIN INSTRUMEN DOUBLE CHAMBER MULTI-
MEDIUM FILTER NO.1  (4 MINGGUAN)
1

ADP19/21788 PEMELIHARAAN RUTIN INSTRUMEN DOUBLE CHAMBER MULTI-
2 MEDIUM FILTER NO.2  (4 MINGGUAN)

ADP19/21789 PEMELIHARAAN RUTIN INSTRUMEN DOUBLE CHAMBER MULTI-
3 MEDIUM FILTER NO.3 (4 MINGGUAN)
ADP19/21790 PEMELIHARAAN RUTIN INSTRUMEN DOUBLE CHAMBER MULTI-
MEDIUM FILTER NO.4 (4 MINGGUAN)
4

ADP19/21807 PEMELIHARAAN RUTIN INSTRUMEN HIGH PRESSURE HEATER 6 (HPH 6)  (4 MING
GUAN)
5
ADP19/21808 PEMELIHARAAN RUTIN INSTRUMEN HIGH PRESSURE HEATER 7 (HPH 7)  (4 MING
GUAN)
6

ADP19/21809 PEMELIHARAAN RUTIN INSTRUMEN HIGH PRESSURE HEATER 8 (HPH 8)  (4 MING
GUAN)
7

ADP19/21821 PEMELIHARAAN RUTIN INSTRUMEN LP HEATER 3 (LPH 3)  (4 MINGGUAN)
8

ADP19/21822 PEMELIHARAAN RUTIN INSTRUMEN LP HEATER 4 (LPH 4)  (4 MINGGUAN)
9

ADP19/21824 PEMELIHARAAN RUTIN INSTRUMEN MAIN STOP VLV (LH)  (4 MINGGUAN)
10

ADP19/21825 PEMELIHARAAN RUTIN INSTRUMEN MAIN STOP VLV (RH)  (4 MINGGUAN)
11

ADP19/22554 (CE) (Unit) PA Flow Mill F bad signal
12

ADP19/21411 (AC) SERVICE RUTIN AC STANDING FLOOR AREA BOILER PDC
13

ADP19/21413 (AC) SERVICE RUTIN AC STANDING FLOOR AREA PORTABLE CLORINT PLANT MCC
14

ADP19/21935 4DX KONTROL INSTRUMEN AREA TURBINE ELECTRONIC ROOM
15

ADP19/21936 4DX KONTROL INSTRUMEN AREA PEDESTAL TURBINE, BFPT A & B, EH OIL
16

ADP19/21937 4DX KONTROL INSTRUMEN AREA COAL FEEDER D
17

ADP19/21938 4DX KONTROL INSTRUMEN AREA MILL D
18

ADP19/21939 4DX KONTROL INSTRUMEN AREA PLC COALY
19
ADP19/21940 4DX KONTROL INSTRUMEN AREA DCS OIL PUMP HOUSE
20

ADP19/22600 (BOP_C) Nitrogen Outlet Valve (00QJB21AA003) Pada Hidrogen Plant Unit 1 Indik
asi Leakage
21

ADP19/22601 (BOP_C) Selenoid Valve N2 File to O2 separator (00QJB31AA002) Pada Hidrogen 
Plant Unit 1 Leakage
22

ADP19/22602 (BOP) -  Indikasi flow outlet header sea water feed pump to purifying system tida
k nunjuk
23

ADP19/21412 (AC) SERVICE RUTIN AC STANDING FLOOR AREA BOILER STAGE MCC / START UP B
OILER
24

ADP19/22300 (BOP) AC Ruang Sampling Rack Mati
25

NO. PEKERJAAN/TEMUAN FEEDBACK

- Problem : Alarm external


Temuan modul DO tdak ada covernya
1 4DX turbin elektronik room - Actual Action :
- Hasil Akhir :
- Summary :

- Problem :
2 4DX Coal Feeder D - Actual Action :
- Hasil Akhir :
- Summary :

- Penyebab :
3 Pm mmf 1 sampai 4 - Actual Action :
- Hasil Akhir :
- Summary :
- Problem :
- Penyebab :
- Actual Action : Hasil pengecekan PLC coaly waste water
. Power supply 228 VAC dan supply output 24 VDC
. Alarm modul plc tidak ada
4DX PLC COALY . Fan panel normal
. Untuk suhu ruangan 20 'C
. Ups rusak
. Modul komunikasi normal
. Temuan banyak kabel di panel plc bocor
- Hasil Akhir :
- Summary :

- Problem :
- Penyebab :
4dx DCS OIL PUMP HOUSE - Actual Action :
- Hasil Akhir :
- Summary :

- Problem :
- Penyebab :
4DX area pedestal turbin, bfpt a - Actual Action :
dan b - Hasil Akhir :
- Summary :

- Problem :
- Penyebab :
4DX mill D - Actual Action :
- Summary :

- Problem :
Pm main stop vlv - Penyebab :
- Actual Action :
- Summary :

- Problem :
- Penyebab :
PM HPH 6 - Actual Action :
- Hasil Akhir :
- Summary :
- Problem :
- Penyebab :
PM HPH 8 - Actual Action :
- Hasil Akhir :
- Summary :

- Problem :
- Penyebab :
PM LPH 4 - Actual Action :
- Hasil Akhir :
- Summary :

- Problem :
- Penyebab :
PM HPH 7 - Actual Action :
- Hasil Akhir :
- Summary :

- Problem :
Pemasangan selang2 dari - Penyebab :
regulator baru ke regulator lama - Actual Action :
set up utk kalibrasi cems - Hasil Akhir :
- Summary :

Temuan utk koneksi velve dr - Problem : Kalibrasi zero gas dng N2 . Utk kalibrasi spesifik gas akan coba d lanjt..
- Penyebab :
sampling gas menuju alanyzer - Actual Action :
leak . Sudh coba d kencangkn
mash leak - Hasil Akhir :
- Summary :

- Problem :
Internal meeting instrument week - Penyebab :
- Actual Action :
ke 39 - Hasil Akhir :
- Summary :

Mengetahui,

I Gede Sukma S.R


Project Leader I & C
I Gede Sukma S.R
Project Leader I & C
NANCE OUTAGE
TROL UNIT BOP
ENG 2 ADIPALA

TANGGAL : Selasa /24 September 2019


HARI ke- : 24

GIATAN

MANPOWER

EKERJAAN DAN PERSENTASE PROGRESS


(%)
WO STATUS
PROGRESS

PM 100% close

PM 100% close

PM 100% close

PM 100% close

PM 100% close
PM 100% close

PM 100% close

PM 100% close

PM 100% close

PM 100% close

PM 100% close

CM 100% close

S 100% close

S 100% close

S 100% close

S 100% close

S 100% close

S 100% close

S 100% close
S 100% close

CD 50% open

CD 50% open

CD 50% open

S 50% open

CD 50% open
oba d lanjt..

Dilaporkan Oleh,

Andika Respati . F
Pengawas Lapangan I & C
Andika Respati . F
Pengawas Lapangan I & C
WORK TYPE

EKSEKUTOR

Feri, Imam, Endra, Ade

Feri, Imam, Endra, Ade

feri, Imam, Endra, Adef

Heriyanto, Adit
Heriyanto, Adit

Heriyanto, Adit

Heriyanto, Adit

Heriyanto, Adit

Tito, Haris

Tito, Haris

Sugiyono, Aji

Tito, Haris

Tito, Haris

Heriyanto, Adit

Sugiyono, Aji

Feri, Imam, Endra, Ade


Feri, Imam, Endra, Ade

Feri, Imam, Endra, Ade

Feri, Imam, Endra, Ade

Feri, Imam, Endra, Ade


LAPORAN KEGIATAN HARIAN MAINTENANCE OUTAGE
PEMELIHARAAN INSTRUMEN DAN KONTROL UNIT BOP
PT. INDONESIA POWER UJP PLTU JATENG 2 ADIPALA

LOKASI KERJA : PLTU ADIPALA


CUACA : CERAH

NO. URAIAN KEGIATAN


1
2
3
4
5
6
7
8
MANPOWER
Project Leader IC : I Gede Sukma SR
Pengawas Lap. IC : Andika Respati Firdaus
Teknisi : Ahmad syifaul, Adhana Tito, Sugiyono, Heriyanto, Feri, Imam
Asisten Teknisi : Adit, Endra, Harris, Aji, Ade
Rendal Har IC : Prawira Sakti
Admin Har IC : Anisa Apriliawati

DETAIL PEKERJAAN DAN PERSENTA

NO. URAIAN KEGIATAN


ADP19/21791 PEMELIHARAAN RUTIN INSTRUMEN DOUBLE CHAMBER MULTI-
MEDIUM FILTER NO.5 (4 MINGGUAN)
1

ADP19/21792 PEMELIHARAAN RUTIN INSTRUMEN DOUBLE CHAMBER MULTI-
2 MEDIUM FILTER NO.6 (4 MINGGUAN)

ADP19/21793 PEMELIHARAAN RUTIN INSTRUMEN DOUBLE CHAMBER MULTI-
3 MEDIUM FILTER NO.7 (4 MINGGUAN)
ADP19/21794 PEMELIHARAAN RUTIN INSTRUMEN DOUBLE CHAMBER MULTI-
MEDIUM FILTER NO.8 (4 MINGGUAN)
4

ADP19/21810 PEMELIHARAAN RUTIN INSTRUMEN HP LP BYPASS CONTROL SYSTEM  (4 MINGGU
AN)
5
ADP19/21811 PEMELIHARAAN RUTIN INSTRUMEN MAIN STOP VLV   (4 MINGGUAN)
6

ADP19/21812 PEMELIHARAAN RUTIN INSTRUMEN GOVERNOR  VLV   (4 MINGGUAN)
7

ADP19/21813 PEMELIHARAAN RUTIN INSTRUMEN REHEAT STOP VLV   (4 MINGGUAN)
8

ADP19/21831 PEMELIHARAAN RUTIN INSTRUMEN SERVICE AIR COMPRESSOR A  (4 MINGGUAN)
9

ADP19/21832 PEMELIHARAAN RUTIN INSTRUMEN SERVICE AIR COMPRESSOR B  (4 MINGGUAN)
10

ADP19/21833 PEMELIHARAAN RUTIN INSTRUMEN SERVICE AIR COMPRESSOR C  (4 MINGGUAN)
11

ADP19/21834 PEMELIHARAAN RUTIN INSTRUMEN INSTRUMENT AIR COMPRESSOR A  (4 MINGG
UAN)
12

ADP19/21835 PEMELIHARAAN RUTIN INSTRUMEN INSTRUMENT AIR COMPRESSOR B  (4 MINGG
UAN)
13

ADP19/21837 PEMELIHARAAN RUTIN INSTRUMEN INSTRUMENT AIR COMPRESSOR C  (4 MINGG
UAN)
14

ADP19/22657 (BOP ) -  AC ruang breaker MCC sea water desalt tidak dingin
15

ADP19/21694 (AC) SERVICE RUTIN AC STANDING FLOOR AREA 400 V SWITCH GEAR ROOM / STA
TION SERVICE PDC POWER DISTRIBUTION
16

ADP19/21695 (AC) SERVICE RUTIN AC STANDING FLOOR AREA LAB BAHAN BAKAR DAN PELUMA
S
17

ADP19/21696 (AC) SERVICE RUTIN AC STANDING FLOOR AREA LAB KIMIA LINGKUNGAN
18

ADP19/21941 4DX KONTROL INSTRUMEN AREA IDF A
19
ADP19/21942 4DX KONTROL INSTRUMEN AREA IDF B
20

ADP19/21943 4DX KONTROL INSTRUMEN AREA COAL FEEDER F
21

ADP19/21995 4DX KONTROL INSTRUMEN AREA MILL F
22

ADP19/21996 4DX KONTROL INSTRUMEN AREA DCS CHLORIN
23

ADP19/21997 4DX KONTROL INSTRUMEN AREA CWP A
24

ADP19/21998 4DX KONTROL INSTRUMEN AREA CWP B
25

ADP19/21999 4DX KONTROL INSTRUMEN AREA CWP C
26

ADP19/22668 penggantian solenoid Air Cannon F1 tidak bisa dioperasikan dari DCS dan Lokal
27

ADP19/15568 Air Cannon F1 tidak bisa dioperasikan dari DCS dan Lokal
28

ADP19/21020 (AC) (BOP) - AC outdoor ruang lab kimia air BOP lantai 2 rusak
29

NO. PEKERJAAN/TEMUAN FEEDBACK

- Problem :
- Actual Action :
1 PM SAC A/B/C - Hasil Akhir :
- Summary :

- Problem :
- Actual Action :
2 PM IAC A/B/C - Hasil Akhir :
- Summary :
- Penyebab :
- Actual Action : Hasil pengecekan DCS chlorine
1. modul normal
2. Tegangan dari Supply back up = 218 v AC
3. Tegangan dari supply = 232V AC
3 4DX DCS CHLORIN 4. Tegangan output rectifier masing2 = 23. 9 V DC
5. AC hidup dan temperatur 22'C
6. Fan Untuk panel DCS normal semua
7. modul vibrasi CWP normal
8. UPS normal
- Hasil Akhir :
- Summary :

- Problem :
- Penyebab :
4DX IDF A - Actual Action :
- Hasil Akhir :
- Summary :

- Problem :
- Penyebab :
4DX IDF B - Actual Action :
- Hasil Akhir :
- Summary :

- Problem :
- Penyebab :
4DX mill F - Actual Action :
- Hasil Akhir :
- Summary :
Catatan
1.cwp a dalam kondisi beroprasi lampu indikator normal dan tidak ada error
2.tidak ada kebocoran di line hydrolic nya
3.PLC kondisi Run
I/O yang actif
DI = 5
DO = 0 dan 7
Relay actif =
220 v ac = nomer 4.
24 V DC = Nomer 1,5 dan 6
PS sudah di cek normal serta di lakukan pelumasan pada switch

Parameter CWP B
level oil = 70
Press out cwp = 0,155 mpa
Perss inlet colling = 0.48 mpa
Press lubricating = 0.205 mpa
Press Hyd = 13 mpa
Power supply in = 231.7 v ac
Power supply out rectifirr = 23.7
4dx cwp a b dan c Catatan
1.cwp b dalam kondisi beroprasi. lampu indikator normal dan tidak ada error
2. Tidak ada kebocoran di line hudraulic nya
3.PLC kondisi Run
I/O yang actif
DI = 5
DO = 0 dan 7
Relay activ =
220 v ac = nomer 1.
24 V DC = Nomer 2.5 dan 6

PS sudah di cek normal serta di lakukan pelumasan pada switch


Parameter CWP C
level oil = 70
Press out cwp = 0.mpa
Perss inlet colling = 0.48 mpa
Press lubricating = 0.205 mpa
Press Hyd = 14 mpa
Power supply in =230.9 v ac
-Power
Problem : out rectifier = 23.83 v dc
supply
- Penyebab :
4DX CF F -Catatan
Actual Action :
-1.cwp
Summary : kondisi stop, lampu indikator normal dan tidak ada error
C dalam
2. kebocoran oil HYD di conector solenoid slowly close saat kondisi cwp stop tidak ada
3.PLC kondisi Run
I/O yang actif
DI = 6 :
- Problem
DO :Q1 =:0
- Penyebab
Lanjut Kalibrasi CEMS Relay actif
- Actual = :
Action
220 v ac
- Hasil = nomer
Akhir : 1
24 V DC =
- Summary : Nomer 3 dan 5

PS sudah di cek normal serta di lakukan pelumasan pada switch


- Summary :

- Problem :
PM main stop valve dan PM - Penyebab :
- Actual Action :
governour valve - Hasil Akhir :
- Summary :
- Problem : Masalah flow meter selalu Nunjuk di 0 m3. D cek d local ada alarm ( S TOL. COIL CUR
- Penyebab :
Pengecekan flow meter no.2 - Actual Action : Ini spesifikasinya
floculation desilter inlet Sudah lepas pasang
- Hasil Akhir :
- Summary :

- Problem :
- Penyebab :
Pm mmf 5 sampai 8 - Actual Action :
- Hasil Akhir :
- Summary :

- Problem :
- Penyebab :
PM HPH bypass sistem - Actual Action :
- Hasil Akhir :
- Summary :

- Problem :
- Penyebab :
PM LP bypass sistem - Actual Action :
- Hasil Akhir :
- Summary :

- Problem :
Penggantian Solenoid Valve Air - Penyebab :
cannon Bunker F no.1 dipending.. - Actual Action :
Ada pekerjaan rusamas. - Hasil Akhir :
- Summary :
Kalibrasi CEMS : update stlh
dilakukan kalibrasi: 1. Nilai range
setting awal utk gas mengikuti - Problem :
nilai yg sama di IK utk gas - Penyebab :
NO:2494 SO:1948.7, CO: 1994 - Actual Action :
2.Terdapat alarm fault sensor - Hasil Akhir :
drift n#1 #2 . 3.utk kebocoran - Summary :
isolating valve yg kmrn dilakukan
repair dan modif.

- Problem :
- Penyebab :
Blow line pa flow mill f - Actual Action :
- Hasil Akhir :
- Summary :

Mengetahui,

I Gede Sukma S.R


Project Leader I & C
NANCE OUTAGE
TROL UNIT BOP
ENG 2 ADIPALA

TANGGAL : Rabu /25 September 2019


HARI ke- : 25

GIATAN

MANPOWER

EKERJAAN DAN PERSENTASE PROGRESS


(%)
WO STATUS
PROGRESS

PM 100% close

PM 100% close

PM 100% close

PM 100% close

PM 100% close
PM 100% close

PM 100% close

PM 100% close

PM 100% close

PM 100% close

PM 100% close

PM 100% close

PM 100% close

PM 100% close

CD 100% close

S 100% close

S 100% close

S 100% close

S 100% close
S 100% close

S 100% close

S 100% close

S 100% close

S 100% close

S 100% close

S 100% close

S 50% open

CD 50% open

CD 50% open
ada error

ada error

error
cwp stop tidak ada
ada alarm ( S TOL. COIL CURR.)
Dilaporkan Oleh,

Andika Respati . F
Pengawas Lapangan I & C
WORK TYPE

EKSEKUTOR

Feri, Imam, Endra, Ade

Feri, Imam, Endra, Ade

Feri, Imam, Endra, Ade

Feri, Imam, Endra, Ade

Tito, Haris, Adit


Tito, Haris, Adit

Tito, Haris, Adit

Tito, Haris, Adit

Sugiyono, Heriyanto, Aji

Sugiyono, Heriyanto, Aji

Sugiyono, Heriyanto, Aji

Sugiyono, Heriyanto, Aji

Sugiyono, Heriyanto, Aji

Sugiyono, Heriyanto, Aji

Sugiyono, Heriyanto, Aji


Sugiyono, Heriyanto, Aji

Sugiyono, Heriyanto, Aji

Sugiyono, Heriyanto, Aji

Feri, Imam, Endra, Ade

Feri, Imam, Endra, Ade

Feri, Imam, Endra, Ade

Feri, Imam, Endra, Ade

Sugiyono, Heriyanto, Aji

Sugiyono, Heriyanto, Aji


LAPORAN KEGIATAN HARIAN MAINTENANCE OUTAGE
PEMELIHARAAN INSTRUMEN DAN KONTROL UNIT BOP
PT. INDONESIA POWER UJP PLTU JATENG 2 ADIPALA

LOKASI KERJA : PLTU ADIPALA


CUACA : CERAH

NO. URAIAN KEGIATAN

cek area bocoran di turbin.


1 Beberapa alat instrument ada yg terkena air dari atas.
Kalo bisa di tutup biar aman

2
3
4
5
6
7
8
MANPOWER
Project Leader IC : I Gede Sukma SR
Pengawas Lap. IC : Andika Respati Firdaus
Teknisi : Ahmad syifaul, Adhana Tito, Sugiyono, Heriyanto, Feri, Imam
Asisten Teknisi : Adit, Endra, Harris, Aji, Ade
Rendal Har IC : Prawira Sakti
Admin Har IC : Anisa Apriliawati

DETAIL PEKERJAAN DAN PERSENTA

NO. URAIAN KEGIATAN


ADP19/21814 PEMELIHARAAN RUTIN INSTRUMEN  INTERMEDIETE VLV (LH)  (4 MINGGUAN)

ADP19/21816 PEMELIHARAAN AUXILIARY STEAM CONTROL SYSTEM  (4 MINGGUAN)
2

ADP19/21817 PEMELIHARAAN HP LP EXTRACTION STEAM SYSTEM (4 MINGGUAN)
3
ADP19/21818 PEMELIHARAAN RUTIN INSTRUMEN  CONDENSATE SYSTEM (4 MINGGUAN)
4
ADP19/21823 PEMELIHARAAN RUTIN INSTRUMEN CONDENSATE MAKE UP DAN TRANSFER SYST
EM  (4 MINGGUAN)
5

ADP19/21826 PEMELIHARAAN RUTIN INSTRUMEN REHEAT STOP VLV (LH)  (4 MINGGUAN)
6

ADP19/21827 PEMELIHARAAN RUTIN INSTRUMEN REHEAT STOP VLV (RH)  (4 MINGGUAN)
7

ADP19/21828 PEMELIHARAAN TURBINE GLAND SEALING STEAM AND DRAIN CONTROL SYSTEM(
4 MINGGUAN)
8

ADP19/21829 PEMELIHARAAN RUTIN INSTRUMEN RUBBER BALL CLEANING SYSTEM  (4 MINGG
UAN)
9

ADP19/21830 PEMELIHARAAN RUTIN INSTRUMEN C3W HE A, B & ELECTRIC FILTER CONTROL SY
TEM  (4 MINGGUAN)
10

ADP19/21838 PEMEIHARAAN BFPT PROPER DRAIN SYSTEM  (4 MINGGUAN)
11

ADP19/21697 (AC) SERVICE RUTIN AC STANDING FLOOR AREA TURBIN MCC
12

ADP19/21698 (AC) SERVICE RUTIN AC STANDING FLOOR UNIT A DAN UNIT B AREA 1st STAGE R
O PUMP
13

ADP19/22051 4DX KONTROL INSTRUMEN AREA BOILER ELECTRONIC ROOM
14

ADP19/22052 4DX KONTROL INSTRUMEN AREA PAF A
15

ADP19/22053 4DX KONTROL INSTRUMEN AREA PAF B
16

ADP19/22054 4DX KONTROL INSTRUMEN AREA COAL FEEDER C
17

ADP19/22055 4DX KONTROL INSTRUMEN AREA MILL C
18
ADP19/22107 4DX KONTROL INSTRUMEN AREA MILL C
19

ADP19/22108 4DX KONTROL INSTRUMEN AREA IGNITER OF BURNER LEVEL C
20

ADP19/22109 4DX KONTROL INSTRUMEN AREA PLC H2 PLANT
21

ADP19/22110 4DX KONTROL INSTRUMEN AREA PLC DAN PC AUXBOL
22

ADP19/22111 4DX KONTROL INSTRUMEN ANALYZER AREA CPP
23

ADP19/22671 (BOP_C) Pembacaan Online Analizer Pada Outlet Header CPP Tidak Akurat
24

ADP19/22670 (unit) Indikasi Temperatur Outlet Condenser B Bad
25

ADP19/21699 (AC) SERVICE RUTIN AC STANDING FLOOR AREA CONDENSITE POLISHING EL.ROO
M
26

NO. PEKERJAAN/TEMUAN FEEDBACK

- Problem :
1 4dx pc dan plc auxbol - Actual Action :
- Hasil Akhir :
- Summary :

- Problem :
- Actual Action : Hasil pengecekan PLC dan PC Auxbol
. Power supply 221 AC dan supply output 23,9DC
. Modul normal tidak ada alarm
2 Dan peralatan i&c di auxbol . Tidak ada fasilitas fan panel
. Untuk suhu ruangan 22°C
. PC normal tidak eror
. Ups normal
- Hasil Akhir :
- Summary :
- Penyebab :
- Actual Action : Sudah d cek kabelnya normal tidak ada yg putus
Terminal Kabel curent d dalam rumah sensor.. .
3 Lanjut pengecekan Udah d ganti modul transmitter nya tapi masih ttp alarm..

- Hasil Akhir :
- Summary :

- Problem :
- Penyebab :
- Actual Action : Hasil pengecekan PLC dan PC H2 plant unit 1 dan 2
▪power supply 220 vac
▪Untuk modul sisi primer dan backup tidak ada alarm (normal)
4dx pc dan plc h2 plant ▪Fan panel normal
▪Untuk suhu ruangan 17°C
▪ PC sementara normal tidak eror
- Hasil Akhir :
- Summary :

- Problem : Ada genangan oli di lube oil station pa fan B


- Penyebab :
4dx PA FAN A DAN B - Actual Action : Parameter Pa fan a dan b
- Hasil Akhir : Selang dps untuk surge normal
Untuk area groundflour aman, panel tdk ada yg ketetesan
- Summary :

- Problem :
Penggantian RTD baru di Outlet - Penyebab :
Condensor A, indikasi sekarang - Actual Action :Temp Otlet Condensor A Sudah normal, dilkukan penggantian RTD baru. Temu
normal. - Hasil Akhir :
- Summary :

- Problem :
Lantai mezanin ada yg kena - Penyebab :
tetesan - Actual Action :
- Summary :

- Problem :
- Penyebab :
4DX CF C - Actual Action :
- Summary :

- Problem :
- Penyebab :
PM Auxiliary Steam system - Actual Action :
- Hasil Akhir :
- Summary :
- Problem :
- Penyebab :
4DX burner level C - Actual Action :
- Hasil Akhir :
- Summary :

- Problem : Display temperatur banyak yg rusak


Pembacaan silica analyzer error dan display redup
Sensor temperatur kabel banyak yg putus
4dx analizyer sampling cpp - Penyebab :
- Actual Action :
- Hasil Akhir :
- Summary :

- Problem : Alarm external


- Penyebab :
4dx boiler elektrik room - Actual Action :
- Hasil Akhir :
- Summary :

- Problem :
- Penyebab :
PM RSV - Actual Action :
- Hasil Akhir :
- Summary :

- Problem :
- Penyebab :
PM IV - Actual Action :
- Hasil Akhir :
- Summary :

- Problem :
- Penyebab :
PM Gland sealing turbin - Actual Action :
- Hasil Akhir :
- Summary :

- Problem :
4dx boiler electronic room : temp - Penyebab :
ruangan Normal. -+24degC , V - Actual Action : Action utk pemasangan grill Fan di NET cabinet boiler terkendala ukuran fan tny
supply in :~228-230,5 VAC , dibndingnkn fan panel lain, sehingga dudukn grill tdk pas
Vout:24,11VDC . - Hasil Akhir :
- Summary :
- Problem :
- Penyebab :
PM LP Extraction steam CS. - Actual Action :
- Hasil Akhir :
- Summary :

- Problem :
- Penyebab :
MOV Diamankan krn ad tetesan - Actual Action :
dr sisi atas
- Hasil Akhir :
- Summary :

- Problem : Ad kebocoran netes dr atas . Sudh dkordinasikan k ccr utk cleaning


Alarm external
Temuan tutup Cover modul tidak ada.
Cek patrol Turbin electronic room Pemasangan grill Fan d panel Drop 15 Turbin electronic
- Penyebab :
- Actual Action :
- Hasil Akhir :
- Summary :

- Problem :
- Penyebab :
4DX mill C - Actual Action :
- Hasil Akhir :
- Summary :

- Problem :
- Penyebab :
Pm ball cleaning systrm - Actual Action :
- Hasil Akhir :
- Summary :

- Problem :
- Penyebab :
Pm HE a dan b - Actual Action :
- Hasil Akhir :
- Summary :

- Problem :
- Penyebab :
Pm elevtric filter a dan b - Actual Action :
- Hasil Akhir :
- Summary :
- Problem :
Display pengopraisan ball - Penyebab :
cleaning buram - Actual Action :
- Hasil Akhir :
- Summary :

- Problem :
Perbaikan Air Cannon F1 - Penyebab :
Pending.. Masih ada pekerjaan - Actual Action :
support air cannon Bungker F - Hasil Akhir :
- Summary :

Pengecekan mov extrasi heater 8


indikasi alarm H2, sudah
dilakukan reset dan di engkol - Problem :
open sedikit, alarm sempet hilang
dan mucul lagii, untuk posisi - Penyebab :
skrang ketika di operasikan open - Actual Action :Indikasi sudaj full open, alarm sudah hilang
- Hasil Akhir :
dari lokal sekitar 5% kemudian di - Summary :
lanjut operator inservis heater 8
( untuk open dari ccr atau lokal
normal)
- Problem : Temuan Kabel Limit switch luka terkena cover kabel tray.
- Penyebab :
Pengechekan Kabel Limit switch - Actual Action :
Outlet Dumper yg mengakibatkan
Mill B trip. Lanjut pengechekan tegangan satu-satu kabel terminasi limit switch outlet dumper Mill B.
- Hasil Akhir :
- Summary :

Untuk otl damper mill b 1-6 - Problem :


indikasi open di force 1 dan - Penyebab :
- Actual Action :
indikasi closed di force 0 ,agar - Hasil Akhir :
mill b bisa standby - Summary :

Baru d lakukan pengecekan pada


kabel LS opn Cls . Udah d tes 1 per
1 . Mcb aman tidak trip . Paling - Problem :
lanjut bsok untuk cek kabel yg - Penyebab :
- Actual Action :
nglupas d atas . Mcb skrg masih - Hasil Akhir :
on unk memastikan sampe bsok - Summary :
pagi , mill b stby start . Udah d
force

Mengetahui,

I Gede Sukma S.R


Project Leader I & C
I Gede Sukma S.R
Project Leader I & C
NANCE OUTAGE
TROL UNIT BOP
ENG 2 ADIPALA

TANGGAL : Kamis /26 September 2019


HARI ke- : 26

GIATAN

MANPOWER

EKERJAAN DAN PERSENTASE PROGRESS


(%)
WO PROGRESS STATUS

PM 100% close

PM 100% close

PM 100% close

PM 100% close
PM 100% close

PM 100% close

PM 100% close

PM 100% close

PM 100% close

PM 100% close

PM 100% close

S 100% close

S 100% close

S 100% close

S 100% close

S 100% close

S 100% close

S 100% close
S 100% close

S 100% close

S 100% close

S 100% close

S 100% close

CD 50% open

CD 100% close

S 100% close
nggantian RTD baru. Temuan RTD Rusak
r terkendala ukuran fan tnyata lbh besar
cleaning
outlet dumper Mill B.

Dilaporkan Oleh,

Andika Respati . F
Pengawas Lapangan I & C
Andika Respati . F
Pengawas Lapangan I & C
WORK TYPE

EKSEKUTOR

Tito, Haris

Tito, Haris

Tito, Haris

Tito, Haris
Tito, Haris

Tito, Haris

Tito, Haris

Feri, Imam, Endra, Ade

Feri, Imam, Endra, Ade

Feri, Imam, Endra, Ade

Sugiyono, Heriyanto,Adit, Aji

Tito, Haris

Sugiyono, Heriyanto,Adit, Aji

Sugiyono, Heriyanto,Adit, Aji

Sugiyono, Heriyanto,Adit, Aji

Sugiyono, Heriyanto,Adit, Aji


Sugiyono, Heriyanto,Adit, Aji

Sugiyono, Heriyanto,Adit, Aji

Feri, Imam, Endra, Ade

Feri, Imam, Endra, Ade

Feri, Imam, Endra, Ade

Feri, Imam, Endra, Ade

Sugiyono, Heriyanto,Adit, Aji


LAPORAN KEGIATAN HARIAN MAINTENANCE OUTAGE
PEMELIHARAAN INSTRUMEN DAN KONTROL UNIT BOP
PT. INDONESIA POWER UJP PLTU JATENG 2 ADIPALA

LOKASI KERJA : PLTU ADIPALA


CUACA : CERAH

NO. URAIAN KEGIATAN


1
2
3
4
5
6
7
8
MANPOWER
Project Leader IC : I Gede Sukma SR
Pengawas Lap. IC : Andika Respati Firdaus
Teknisi : Ahmad syifaul, Adhana Tito, Sugiyono, Heriyanto, Feri, Imam
Asisten Teknisi : Adit, Endra, Harris, Aji, Ade
Rendal Har IC : Prawira Sakti
Admin Har IC : Anisa Apriliawati

DETAIL PEKERJAAN DAN PERSENTA

NO. URAIAN KEGIATAN


ADP19/22124 4DX KONTROL INSTRUMEN AREA FDF A

ADP19/22125 4DX KONTROL INSTRUMEN AREA FDF B
2

ADP19/22126 4DX KONTROL INSTRUMEN AREA COAL FEEDER A
3
ADP19/22127 4DX KONTROL INSTRUMEN AREA MILL A
4

ADP19/22128 4DX KONTROL INSTRUMEN AREA PLC PURIFYING
5
ADP19/22129 4DX KONTROL INSTRUMEN AREA TBS A
6

ADP19/22130 4DX KONTROL INSTRUMEN AREA TBS B
7

ADP19/22754 Penggantian Temperature Outlet Condenser B (Bad)
8

ADP19/21701 (AC) SERVICE RUTIN AC SPLIT AREA KONTENER MEKANIK 1(Warna biru/Lama)
9

ADP19/22755 (unit) Outlet Mill B Loss Power
10

ADP19/21700 (AC) SERVICE RUTIN AC STANDING FLOOR AREA LAB TRIBOLOGY & DGA
11

ADP19/21702 (AC) SERVICE RUTIN AC SPLIT AREA POS LOKAL OPERATOR BOP
12

ADP19/22131 4DX KONTROL INSTRUMEN AREA TBS C
13

NO. PEKERJAAN/TEMUAN FEEDBACK


- Problem :
- Actual Action : Hasil pengecekan PLC purifaying
▪power supply 224 AC dan supply output 23,9 DC
1 4dx plc purifying ▪Fan panel normal
▪Untuk suhu ruangan 20°C
- Hasil Akhir :
- Summary :

- Problem :
2 4DX FDF A - Actual Action : Selang PS Surge Masih masih normal
- Hasil Akhir :
- Summary :
- Penyebab :
3 4DX FDF B - Actual Action :
- Hasil Akhir :
- Summary :

- Problem :
- Penyebab :
- Actual Action : 1.TBS A beroprasi
. Level in tbs: 7.3 m
. Level out tbs : 7.48 m
. Level in trashcar :7.37 m
. Posisi mov water spray tbs open 100%
. Limit switch jump buth di cek visual
. Limit switch chain draw d cek visual
2.TBS B running
. Level in tbs: 7.26 m
. Level out tbs : 7.50 m
4dx tbs abc Dan trashcar . Level in trashcar :7.42 m
. Posisi mov water spray tbs open 100%
. Limit switch jump buth secara visual normal
. Limit switch chain draw secara visual normal
3.TBS C stop
. Level in tbs: 7.3 m
. Level out tbs : 7.54 m
. Level in trashcar: 7.43 m
. Posisi mov water spray tbs open 0%
. Limit switch jump buth di test normal
. Limit switch chain draw di tes normal
- Hasil Akhir :
- Summary :

- Problem :
- Penyebab :
4DX MILL A - Actual Action :
- Hasil Akhir :
- Summary :
- Problem :
Pekerjaan support air Cannon CF - Penyebab :
F blm selesai . - Actual Action :
- Hasil Akhir :
- Summary :

- Problem :
4DX Coal Feeder A. - Penyebab :
- Actual Action :
- Summary :

Lanjut pengechekan kabel tray - Problem : Kabel dari panel lokal ke terminal BOx atas mill B
Limit switch outlet dumper Mill B - Penyebab :
yg bermasalah. - Actual Action :
- Summary :

Mengetahui,

I Gede Sukma S.R


Project Leader I & C
NANCE OUTAGE
TROL UNIT BOP
ENG 2 ADIPALA

TANGGAL : Jumat /27 September 2019


HARI ke- : 27

GIATAN

MANPOWER

EKERJAAN DAN PERSENTASE PROGRESS


(%)
WO STATUS
PROGRESS

S 100% close

S 100% close

S 100% close

S 100% close

S 100% close
S 100% close

S 100% close

CD 100% close

S 100% close

CD 100% close

S 100% close

S 100% close

S 100% close
Dilaporkan Oleh,

Andika Respati . F
Pengawas Lapangan I & C
WORK TYPE

EKSEKUTOR

Sugiyono, Aji

Sugiyono, Aji

Heriyanto, Adit, Haris

Feri, Imam, Endra, Ade

Feri, Imam, Endra, Ade


Feri, Imam, Endra, Ade

Feri, Imam, Endra, Ade

Heriyanto, Adit, Haris

Sugiyono, Aji

Feri, Imam, Endra, Ade


LAPORAN KEGIATAN HARIAN MAINTENANCE OUTAGE
PEMELIHARAAN INSTRUMEN DAN KONTROL UNIT BOP
PT. INDONESIA POWER UJP PLTU JATENG 2 ADIPALA

LOKASI KERJA : PLTU ADIPALA


CUACA : CERAH

NO. URAIAN KEGIATAN


1
2
3
4
5
6
7
8
MANPOWER
Project Leader IC : I Gede Sukma SR
Pengawas Lap. IC : Andika Respati Firdaus
Teknisi : Ahmad syifaul, Adhana Tito, Sugiyono, Heriyanto, Feri, Imam
Asisten Teknisi : Adit, Endra, Harris, Aji, Ade
Rendal Har IC : Prawira Sakti
Admin Har IC : Anisa Apriliawati

DETAIL PEKERJAAN DAN PERSENTA

NO. URAIAN KEGIATAN


ADP19/21703 (AC) SERVICE RUTIN AC SPLIT UNIT A DAN UNIT B AREA KONTENER MEKANIK 2 (
Warna Merah/Baru)
1

ADP19/21705 (AC) SERVICE RUTIN AC SPLIT AREA KONTENER HAR LISTRIK
2

ADP19/21706 (AC) SERVICE RUTIN AC SPLIT AREA KONTENER INSTRUMEN
3
ADP19/21708 (AC) SERVICE RUTIN AC SPLIT AREA RUANG CONTROL LIFT BOILER
4

ADP19/22132 4DX KONTROL INSTRUMEN AREA COAL FEEDER E
5
ADP19/22133 4DX KONTROL INSTRUMEN AREA MILL E
6

ADP19/22134 4DX KONTROL INSTRUMEN ANALYZER AREA SAMPLING RACK
7

NO. PEKERJAAN/TEMUAN FEEDBACK

- Problem :
- Actual Action :
1 4DX Mill E - Hasil Akhir :
- Summary :

- Problem : Temuan Cover led Indicator Otlet Damper Cf E copot..


- Actual Action :
2 4Dx Coap Feeder E - Hasil Akhir :
- Summary :

Perbaikan Air cannon bunker F1 - Penyebab :


3 dipending, Masih ada pekerjaan - Actual Action :
By Rusamas. - Hasil Akhir :
- Summary :

- Problem :
- Penyebab :
4Dx Sampling Rack Analizer - Actual Action :
- Hasil Akhir :
- Summary :

Mengetahui,

I Gede Sukma S.R


Project Leader I & C
NANCE OUTAGE
TROL UNIT BOP
ENG 2 ADIPALA

TANGGAL : Sabtu /28 September 2019


HARI ke- : 28

GIATAN

MANPOWER

EKERJAAN DAN PERSENTASE PROGRESS


(%)
WO STATUS
PROGRESS

S 100% close

S 100% close

S 100% close

S 100% close

S 100% close
S 100% close

S 100% close

Dilaporkan Oleh,

Andika Respati . F
Pengawas Lapangan I & C
WORK TYPE

EKSEKUTOR

Heriyanto, Endra
Heriyanto, Endra

Heriyanto, Endra
LAPORAN KEGIATAN HARIAN MAINTENANCE OUTAGE
PEMELIHARAAN INSTRUMEN DAN KONTROL UNIT BOP
PT. INDONESIA POWER UJP PLTU JATENG 2 ADIPALA

LOKASI KERJA : PLTU ADIPALA


CUACA : CERAH

NO. URAIAN KEGIATAN


1
2
3
4
5
6
7
8
MANPOWER
Project Leader IC : I Gede Sukma SR
Pengawas Lap. IC : Andika Respati Firdaus
Teknisi : Ahmad syifaul, Adhana Tito, Sugiyono, Heriyanto, Feri, Imam
Asisten Teknisi : Adit, Endra, Harris, Aji, Ade
Rendal Har IC : Prawira Sakti
Admin Har IC : Anisa Apriliawati

DETAIL PEKERJAAN DAN PERSENTA

NO. URAIAN KEGIATAN


ADP19/22135 4DX KONTROL INSTRUMEN AREA IGNITER OF BURNER LEVEL D

ADP19/22136 4DX KONTROL INSTRUMEN AREA PLC DAN PC DESAL
2

NO. PEKERJAAN/TEMUAN FEEDBACK

- Problem :
- Actual Action :
1 4DX IGNITER BURNER LEVEL D - Hasil Akhir :
- Summary :
- Problem :
2 4dx pc dan plc desal - Actual Action :
- Hasil Akhir :
- Summary :

Mengetahui,

I Gede Sukma S.R


Project Leader I & C
NANCE OUTAGE
TROL UNIT BOP
ENG 2 ADIPALA

TANGGAL : Minggu /29 September 2019


HARI ke- : 29

GIATAN

MANPOWER

EKERJAAN DAN PERSENTASE PROGRESS


(%)
WO STATUS
PROGRESS

S 100% close

S 100% close
Dilaporkan Oleh,

Andika Respati . F
Pengawas Lapangan I & C
WORK TYPE

EKSEKUTOR

Moh.imam, Adit

Moh.imam, Adit
LAPORAN KEGIATAN HARIAN MAINTENANCE OUTAGE
PEMELIHARAAN INSTRUMEN DAN KONTROL UNIT BOP
PT. INDONESIA POWER UJP PLTU JATENG 2 ADIPALA

LOKASI KERJA : PLTU ADIPALA


CUACA : CERAH

NO. URAIAN KEGIATAN


1
2
3
4
5
6
7
8
MANPOWER
Project Leader IC : I Gede Sukma SR
Pengawas Lap. IC : Andika Respati Firdaus
Teknisi : Ahmad syifaul, Adhana Tito, Sugiyono, Heriyanto, Feri, Imam
Asisten Teknisi : Adit, Endra, Harris, Aji, Ade
Rendal Har IC : Prawira Sakti
Admin Har IC : Anisa Apriliawati

DETAIL PEKERJAAN DAN PERSENTA

NO. URAIAN KEGIATAN

5
6

10

11

12

13

14

15

16

17

18

19
20

21

NO. PEKERJAAN/TEMUAN FEEDBACK

- Problem :
- Actual Action :
1 - Hasil Akhir :
- Summary :

- Problem :
- Actual Action :
2 - Hasil Akhir :
- Summary :

- Penyebab :
3 - Actual Action :
- Hasil Akhir :
- Summary :

- Problem :
- Penyebab :
- Actual Action :
- Hasil Akhir :
- Summary :

- Problem :
- Penyebab :
- Actual Action :
- Hasil Akhir :
- Summary :

- Problem :
- Penyebab :
- Actual Action :
- Hasil Akhir :
- Summary :
- Problem :
- Penyebab :
- Actual Action :
- Summary :

- Problem :
- Penyebab :
- Actual Action :
- Summary :

- Problem :
- Penyebab :
- Actual Action :
- Hasil Akhir :
- Summary :

- Problem :
- Penyebab :
- Actual Action :
- Hasil Akhir :
- Summary :

- Problem :
- Penyebab :
- Actual Action :
- Hasil Akhir :
- Summary :
- Problem :
- Penyebab :
- Actual Action :
- Hasil Akhir :
- Summary :

- Problem :
- Penyebab :
- Actual Action :
- Hasil Akhir :
- Summary :

- Problem :
- Penyebab :
- Actual Action :
- Hasil Akhir :
- Summary :

Mengetahui,

I Gede Sukma S.R


Project Leader I & C
NANCE OUTAGE
TROL UNIT BOP
ENG 2 ADIPALA

TANGGAL : Senin /30 September 2019


HARI ke- : 30

GIATAN

MANPOWER

EKERJAAN DAN PERSENTASE PROGRESS


(%)
WO STATUS
PROGRESS
Dilaporkan Oleh,

Andika Respati . F
Pengawas Lapangan I & C
WORK TYPE

EKSEKUTOR

Anda mungkin juga menyukai