Anda di halaman 1dari 15

23 PFC26

PFC24 PFC25 EJ.5


JAYA PRATAMA

PEMBANGUNAN 6 (ENAM) RUAS JALAN TOL DALAM KOTA JAKARTA


TAHAP 1 RUAS SEMANAN-SUNTER DAN SUNTER - PULO GEBANG
26900 19200 22789 CB1 CB2 CB3 CB4 CB5 CB6 CB7 CB8 CB9 CB10 CB11 CB12 CB13 CB14 CB15 CB16 CB17 CB18 CB19 CB20 CB21 CB22 CB23SEKSI A KELAPA GADING-PULO GEBANG (STA. 21+881 - STA. 31+168)

343500
SLAB ON PILE TIM PERENCANA
PENYEDIA JASA KONSTRUKSI
9436 7976 8167 8270 7913 7465 7494 7534 7573 7607 7629 7639 7635 7657 7624 8259 9008 8906 8691 8712 8718 8724 8496
CL JEMBATAN
FG. 25131
9000

2%
CIPTA GRAHA ABADI JAYA
STA. 0+515.396 STA. 0+542.296
Engineering Consultant KONSTRUKSI

FG. 15.891 FG. 15.758


STA. 0+561.496
6723

STA. 0+584.285
FG. 15.507 FG. 14.897

TIM PERENCANA KEPALA PROYEK

7522

6923
8220

6753

6285

6048
5950

5909
5800

5440
5696

5308

5043

4954

4904

4844
5002
5155

4872

4664
4769

4478
4812

4215

3950
Ir.Jodi Firmansjah,MSE,Phd Andy
AndyMaruly
Maruli H.

DIPERIKSA OLEH :

POTONGAN MEMANJANG 2
SKALA 1 : 750 -
PT. CIPTA STRADA
ENGINEERING CONSULTANS

Ir. M. Zahir Siregar

DISETUJUI OLEH :

6
PFC2.5 27
CB JAYA PRATAMA
E J CB4 CB5 CB6 CB7 CB8
CB2 CB3 CB9 CB10 CB11 CB 5 Heny Mayawati, ST

CB1 12 CB13 CB14 CB15 CB2


CB16 CB17 CB18
CB19

AN
6 GAMBAR PERENCANAAN
25 CB23 CB2

NG
PFC CB21

PU
4 JUDUL GAMBAR :
CB2

M
KA
SI RAYA
S00I RAYA

8167 8270 7913


CB22

R
7976 7465 7494 7534

PE
7573
CB20
9436 7607
40000

7629 7639
UNAN

7635 7657 7624 8906 8691


8259 9008
JL. BEKA
JL. BE29K+A0

824 (PAKET 10 RAMP OFF CAKUNG)

N
8712 8718 2
BANG

GA
227 8265
89 8496 DENAH DAN POTONGAN MEMANJANG SOP

N
8724

PU
0+600 LEMBAR 2-2

AM
0+650

K
ER P
192
P10.28

00

0+750
0+700 CATATAN :
0+
55
GRIYA 0
GTO OBS

BANG
N
0

.PG

UNAN
90

TP
26

50000
CM
80

TR
AE

28+950
A
PIP .
TP

DENAH JEMBATAN 1 SKALA : 1 : 750


- KODE GAMBAR NO. GAMBAR NO. LEMBAR JML. LEMBAR REVISI
SKALA 1 : 750
CAKUNG
AGEN BI
JL . RING ROAD
27

0+150
JAYA PRATAMA

PEMBANGUNAN 6 (ENAM) RUAS JALAN TOL DALAM KOTA JAKARTA


TAHAP 1 RUAS SEMANAN-SUNTER DAN SUNTER - PULO GEBANG
CB20 CB21 CB22 CB23 CB24 CB25 CB26 CB27 CB28 CB29 CB30 CB31 CB32 CB33 CB34 CB35 CB36 CB37 CB38 CB39 CB40 CB31 CB32 CB33 SEKSI A KELAPA GADING-PULO GEBANG (STA. 21+881 - STA. 31+168)

343500
SLAB ON PILE TIM PERENCANA
PENYEDIA JASA KONSTRUKSI
8712 8718 8724 8496 8265 8242 7999 7753 7800 7793 7744 7755 7756 7766 7776 7789 7807 7809 7808 7820 7794 7755 7636 7500

CIPTA GRAHA ABADI JAYA


Engineering Consultant KONSTRUKSI

TIM PERENCANA KEPALA PROYEK


Rigid Pavement
4664

4478

4215

3950

3477

2936

2486

2247

2021

1850

1775

1766

1789

1377
1852

1890

800
1898

2057
1925
1818

2144
1979

1917
Ir.Jodi Firmansjah,MSE,Phd Andy
AndyMaruly
Maruli H.

DIPERIKSA OLEH :

POTONGAN MEMANJANG 2
SKALA 1 : 750 -
PT. CIPTA STRADA
ENGINEERING CONSULTANS
CB
08

18

Ir. M. Zahir Siregar


CB
90

19 DISETUJUI OLEH :
00

06
0+7

89
PUNGA

91
86
CB
PERKAM

CB 21
20 JAYA PRATAMA
Heny Mayawati, ST
12
87
CB2
18 CB 3 GAMBAR PERENCANAAN
87 22
CB2 1
5 CB4 JUDUL GAMBAR :
CB2 CB27
CB39 2
N

24 4
CB4 3 nt
PUNGA

87
CB26
CB29
CB31 CB37 CB4 Pav
e me
CB35
6 9
CB33 0
0
75
84
CB4 Rig
id
95
0 (PAKET 10 GRAMP OFF CAKUNG)
N
PERKAM

0+ CB28 0 0+
265
CB30 CB38 750 DENAH DAN U
A K POTONGAN MEMANJANG SOP

N
CB36
8
6
763 C LEMBAR 1-2

PUNGA
CB32 CB34
AD
2
824 5
775 O
GR
9
799 7794
7820
RIN
7753 PERKAM
7808
JL.
7800 7744
7793 7755 7807 7809
7756 7766 7776 7789
CATATAN :
igi

0
0+80 0
0+90
d

0
15
Pa

0+
ve
me
nt

0+850

DENAH JEMBATAN
N

1 SKALA : 1 : 750
PUNGA

- KODE GAMBAR NO. GAMBAR NO. LEMBAR JML. LEMBAR REVISI


0+1
00 SKALA 1 : 750
ERKAM
JAYA PRATAMA
1
-

PEMBANGUNAN 6 (ENAM) RUAS JALAN TOL DALAM KOTA JAKARTA


CL PILE CL ALINYEMEN CL PILE TAHAP 1 RUAS SEMANAN-SUNTER DAN SUNTER - PULO GEBANG
SEKSI A KELAPA GADING-PULO GEBANG (STA. 21+881 - STA. 31+168)

9000

4500 4500
P1 P2 TIM PERENCANA
P2 P1 "A"P1 PENYEDIA JASA KONSTRUKSI

350
355

1055
6 D19

∅1
CIPTA GRAHA ABADI JAYA

75
100 600
Engineering Consultant KONSTRUKSI

700
700

350
D13-200
150

TIM PERENCANA KEPALA PROYEK

1000 3500 3500 1000


VARIABEL

DETAIL "A" 3 Ir.Jodi Firmansjah,MSE,Phd Andy Maruli H.

GROUND LEVEL SKALA 1 : 25 -


DIPERIKSA OLEH :

PT. CIPTA STRADA


ENGINEERING CONSULTANS

CSP Ø600 L=20m


DARI MUKA TANAH ASLI Ir. M. Zahir Siregar

DISETUJUI OLEH :

TIPIKAL DIMENSI CAPPING BEAM 9M 1


SKALA 1 : 50 -
JAYA PRATAMA
Heny Mayawati, ST

GAMBAR PERENCANAAN

L PILE JUDUL GAMBAR :

1000
PRECAST SLAB PRECAST SLAB
500 500 (PAKET 10 OFF CAKUNG)
var TIPIKAL DIMENSI CAPPING BEAM 9M
SLAB ON PILE
5
5 350

LEMBAR 1-3
RUBBER SHEET t=5mm
100 600

700
150

CATATAN :
50 900 50
1000

CSP Ø600 L=20m


DARI MUKA TANAH ASLI

POTONGAN 1 2 Catatan : SKALA : 1:50


SKALA 1 : 50 -
- Kedalaman tiang pancang mulai dari muka tanah asli KODE GAMBAR NO. GAMBAR NO. LEMBAR JML. LEMBAR REVISI
- kemiringan deck slab mengacu pada super elevasi
- Lebar deck slab mengacu pada gambar plan
JAYA PRATAMA

PEMBANGUNAN 6 (ENAM) RUAS JALAN TOL DALAM KOTA JAKARTA


TAHAP 1 RUAS SEMANAN-SUNTER DAN SUNTER - PULO GEBANG
1 SEKSI A KELAPA GADING-PULO GEBANG (STA. 21+881 - STA. 31+168)
-

CL PILE CL ALINYEMEN CL PILE

9000 TIM PERENCANA


PENYEDIA JASA KONSTRUKSI
4500 4500
P1a P2a
"A"P1a
PIN MOVE D32
P2a P1a 6 D19

∅1
CIPTA GRAHA ABADI JAYA

75
Engineering Consultant KONSTRUKSI

350

350
355

D13-200
GROUND LEVEL

5
625 625 1000 625 625 500 TIM PERENCANA KEPALA PROYEK

1055
625 625 1000 625 625 1000
500

100 600
700
700

150

1000 3500 3500 1000


DETAIL "A" 3 Ir.Jodi Firmansjah,MSE,Phd Andy Maruli H.
SKALA 1 : 25 -
DIPERIKSA OLEH :

CSP Ø600 L=20m


DARI MUKA TANAH ASLI PT. CIPTA STRADA
ENGINEERING CONSULTANS

Ir. M. Zahir Siregar

DISETUJUI OLEH :

DIMENSI CAPPING BEAM EJ 9M 1


SKALA 1 : 50 -
JAYA PRATAMA
Heny Mayawati, ST

GAMBAR PERENCANAAN
CL PILE
JUDUL GAMBAR :
PRECAST SLAB
1200
Rigid Pavement
PIN MOVE D32 600 600
(PAKET 10 OFF CAKUNG)
TIPIKAL DIMENSI CAPPING BEAM 9M
300
5 350

Ø D1 (ANCHOR BAR) ANTI CORROSIVE FILLER SLAB ON PILE


S3 LEMBAR 2-3
DETAIL LIST MOVED
ANGKUR D25 t1 S2 D1 S2 t1
100 600

745

∅ D1 ∅ D2 S1 t1 S2 S3
t1

2.5

(mm) (mm) (mm) (mm) (mm) (mm)


150

D1
S1

32 - 37 3 50 138
50 1100 50 CATATAN :
2.5

1200
t1

Ø D2 (CAP) SGP

CSP Ø600 L=20m MOVED DETAIL


DARI MUKA TANAH ASLI

POTONGAN 1 2 Catatan : SKALA : 1:50


SKALA 1 : 50 -
- Kedalaman tiang pancang mulai dari muka tanah asli KODE GAMBAR NO. GAMBAR NO. LEMBAR JML. LEMBAR REVISI
- kemiringan deck slab mengacu pada super elevasi
- Lebar deck slab mengacu pada gambar plan
JAYA PRATAMA

PEMBANGUNAN 6 (ENAM) RUAS JALAN TOL DALAM KOTA JAKARTA


TAHAP 1 RUAS SEMANAN-SUNTER DAN SUNTER - PULO GEBANG
SEKSI A KELAPA GADING-PULO GEBANG (STA. 21+881 - STA. 31+168)

CL ALINYEMEN
TIM PERENCANA
CL PILE CL PILE CL PILE CL PILE CL PILE CL PILE CL PILE CL PILE
PENYEDIA JASA KONSTRUKSI

28200
CIPTA GRAHA ABADI JAYA
Engineering Consultant KONSTRUKSI

14100 14100

TIM PERENCANA KEPALA PROYEK

600 350
100 5

700
700

150

1850 3500 3500 3500 3500 3500 3500 3500 1850 Ir.Jodi Firmansjah,MSE,Phd Andy Maruli H.

DIPERIKSA OLEH :
VARIABEL

PT. CIPTA STRADA


ENGINEERING CONSULTANS

Ir. M. Zahir Siregar

DISETUJUI OLEH :

JAYA PRATAMA
Heny Mayawati, ST
GROUND LEVEL

GAMBAR PERENCANAAN

JUDUL GAMBAR :

(PAKET 10 OFF CAKUNG)


CSP Ø600 L=20m TIPIKAL DIMENSI CAPPING BEAM 28.2M
DARI MUKA TANAH ASLI SLAB ON PILE
LEMBAR 3-3

TIPIKAL DIMENSI CAPPING BEAM 28.2M 1 CATATAN :


SKALA 1 : 100 -

Catatan : SKALA : 1:50


- Kedalaman tiang pancang mulai dari muka tanah asli KODE GAMBAR NO. GAMBAR NO. LEMBAR JML. LEMBAR REVISI
- kemiringan deck slab mengacu pada super elevasi
- Lebar deck slab mengacu pada gambar plan
JAYA PRATAMA
B D
-
350 - 350
PEMBANGUNAN 6 (ENAM) RUAS JALAN TOL DALAM KOTA JAKARTA
150 150 TAHAP 1 RUAS SEMANAN-SUNTER DAN SUNTER - PULO GEBANG
100 100 100 100 SEKSI A KELAPA GADING-PULO GEBANG (STA. 21+881 - STA. 31+168)

20

20

20

20
80

80
70 70
40 40
40 40
TIM PERENCANA
PENYEDIA JASA KONSTRUKSI

CIPTA GRAHA ABADI JAYA


Engineering Consultant KONSTRUKSI

TIM PERENCANA KEPALA PROYEK

C
-
7000

7000

7000

7000
A Ir.Jodi Firmansjah,MSE,Phd Andy Maruli H.
-
DIPERIKSA OLEH :

PT. CIPTA STRADA


ENGINEERING CONSULTANS

Ir. M. Zahir Siregar

DISETUJUI OLEH :

JAYA PRATAMA
Heny Mayawati, ST
40 40
40 40
70 70 GAMBAR PERENCANAAN
80

80
JUDUL GAMBAR :
20

20

20

20
VAR. 115 100 100 115 2020 115 100 100
150 150
1125-2000 2250
350 350
(PAKET 10)
TIPIKAL DIMENSI PANEL PRECAST
SLAB ON PILE
PANEL TYPE P1 1 POTONGAN B 3 PANEL TYPE P2 4 POTONGAN D 6 LEMBAR 1-2
SKALA 1 : 50 - SKALA 1 : 50 - SKALA 1 : 50 - SKALA 1 : 50 -

CATATAN :
1125-2000 2250
VAR. 115 115 2020 115
85 150

85 150

85 150
350

350
115

115

115
POTONGAN A 2 POTONGAN C 5
SKALA 1 : 50 - SKALA 1 : 50 - SKALA : 1:50

KODE GAMBAR NO. GAMBAR NO. LEMBAR JML. LEMBAR REVISI


JAYA PRATAMA
B D
-
350 - 350
PEMBANGUNAN 6 (ENAM) RUAS JALAN TOL DALAM KOTA JAKARTA
150 150 TAHAP 1 RUAS SEMANAN-SUNTER DAN SUNTER - PULO GEBANG
100 100 100 100 SEKSI A KELAPA GADING-PULO GEBANG (STA. 21+881 - STA. 31+168)

20

20

20

20
80

80
70 70
40 40
40 40
TIM PERENCANA
PENYEDIA JASA KONSTRUKSI

CIPTA GRAHA ABADI JAYA


Engineering Consultant KONSTRUKSI

TIM PERENCANA KEPALA PROYEK

C
6800

6800
-
7000

7000

7000

7000
A Ir.Jodi Firmansjah,MSE,Phd Andy Maruli H.
-
DIPERIKSA OLEH :

PT. CIPTA STRADA


ENGINEERING CONSULTANS

Ir. M. Zahir Siregar

DISETUJUI OLEH :

JAYA PRATAMA
Heny Mayawati, ST
40 40
VAR. 625 40 625 1000 625 40
70 70 GAMBAR PERENCANAAN
200

200

200

200
80

80
JUDUL GAMBAR :
20

20

20

20
VAR. 115 100 100 115 2020 115 100 100
150 150
1125-2000 2250
350 350
(PAKET 10)
TIPIKAL DIMENSI PANEL PRECAST
SLAB ON PILE
PANEL TYPE P1a 1 POTONGAN B 3 PANEL TYPE P2a 4 POTONGAN D 6 LEMBAR 1-2
SKALA 1 : 50 - SKALA 1 : 50 - SKALA 1 : 50 - SKALA 1 : 50 -

CATATAN :
1125-2000 2250
VAR. 115 115 2020 115
85 150

85 150

85 150
350

350
115

115

115
POTONGAN A 2 POTONGAN C 5
SKALA 1 : 50 - SKALA 1 : 50 - SKALA : 1:50

KODE GAMBAR NO. GAMBAR NO. LEMBAR JML. LEMBAR REVISI


CL BRIDGE
JAYA PRATAMA
9000

200
PEMBANGUNAN 6 (ENAM) RUAS JALAN TOL DALAM KOTA JAKARTA

50
TAHAP 1 RUAS SEMANAN-SUNTER DAN SUNTER - PULO GEBANG
SEKSI A KELAPA GADING-PULO GEBANG (STA. 21+881 - STA. 31+168)

VARIABEL
TIM PERENCANA
1 PENYEDIA JASA KONSTRUKSI
-
1500 2000 2000 2000 1500
ANCHOR D25

CIPTA GRAHA ABADI JAYA


Engineering Consultant KONSTRUKSI

TIM PERENCANA KEPALA PROYEK

TIPIKAL RIGID PAVEMENT SLAB ON PILE 1


SCALE 1 : 75 -

Ir.Jodi Firmansjah,MSE,Phd Andy Maruli H.

2 DIPERIKSA OLEH :
-

CL BRIDGE
1500 2000 2000 2000 1500
DETAIL A ANCHOR D25 PT. CIPTA STRADA
ENGINEERING CONSULTANS

Ir. M. Zahir Siregar


300

DISETUJUI OLEH :

JAYA PRATAMA
Heny Mayawati, ST

POTONGAN 1 2
-
GAMBAR PERENCANAAN
SCALE 1 : 75

JUDUL GAMBAR :

50

50
VARIABEL (PAKET 10)
150 TIPIKAL RIGID PAVEMENT SLAB ON PILE
AC-WC 200 NOTCH 50x200 mm 300 25
50
50

ANCHOR D25
50
300

200

DETAIL A 5
510

DETAIL ANCHOR D25 4 CATATAN :


310

NTS -

NTS -
EXISTING PAVEMENT SIRTU EMBANKMENT LEAN CONCRETE fc' 10 MPa
T=VAR ANCHOR D25
RUBBER SHEET T=5mm

POTONGAN 2 3
NTS - SKALA : 1:75

KODE GAMBAR NO. GAMBAR NO. LEMBAR JML. LEMBAR REVISI


JAYA PRATAMA

PEMBANGUNAN 6 (ENAM) RUAS JALAN TOL DALAM KOTA JAKARTA


TAHAP 1 RUAS SEMANAN-SUNTER DAN SUNTER - PULO GEBANG

40
D
SEKSI A KELAPA GADING-PULO GEBANG (STA. 21+881 - STA. 31+168)

150
CAPPING BEAM
TIM PERENCANA
PENYEDIA JASA KONSTRUKSI

CIPTA GRAHA ABADI JAYA


1 Engineering Consultant KONSTRUKSI

TIM PERENCANA KEPALA PROYEK

VARIABEL 8 (B1) D22 (B2) Ø10-150


8 (B1) D22
CSP Ø500
L = --M Ir.Jodi Firmansjah,MSE,Phd Andy Maruli H.

(B2) ∅10-150
DIPERIKSA OLEH :

PT. CIPTA STRADA


ENGINEERING CONSULTANS

GROUND LEVEL 110 380 110 Ir. M. Zahir Siregar

DISETUJUI OLEH :
600

POTONGAN 1 2 JAYA PRATAMA


SKALA 1 : 20 - Heny Mayawati, ST
1500

GAMBAR PERENCANAAN

JUDUL GAMBAR :

DETAIL ISIAN CSP ∅600mm


PELAT t=8mm

CSP Ø600
L = 20M

CATATAN :

110 380 110


600

TIPIKAL TULANGGAN ISIAN CSP Ø600 1 CATATAN :


SKALA 1 : 20 - - Untuk pondasi tiang pancang SKALA : 1:20
Final set 1cm per 10 pukulan yang di ambil minimum 2 kali berturut-turut.
KODE GAMBAR NO. GAMBAR NO. LEMBAR JML. LEMBAR REVISI
- Batas tulangan isian CSP 1500mm dari ground level
JAYA PRATAMA

2 1 PEMBANGUNAN 6 (ENAM) RUAS JALAN TOL DALAM KOTA JAKARTA


- -
TAHAP 1 RUAS SEMANAN-SUNTER DAN SUNTER - PULO GEBANG
SEKSI A KELAPA GADING-PULO GEBANG (STA. 21+881 - STA. 31+168)

CL PILE CL ALINYEMEN CL PILE

9000
(J2) D16-100 (J2) D16-100
(J2a) D16-100 (J2a) D16-100 (J2) D16-100 (J2a) D16-100 (J2a) D16-100 TIM PERENCANA
PENYEDIA JASA KONSTRUKSI
(C6) D16-100 (C6a) D16-100 (C6) D16-100 (C6a) D16-100 (C6) D16-100
(C6a) D16-100 (C1) D25-150 (J1) 2xD25-150 (C6a) D16-100
6 D19

∅1
75
(T2) D16-150 CIPTA GRAHA ABADI JAYA
Engineering Consultant KONSTRUKSI
(T2) D16-150

350
(T1) 3 D16
D13-200
(T1) 3 D16

TIM PERENCANA KEPALA PROYEK

(C7a) D16-100 (C2) D25-150 (C3) 2 D25 (C5) D25-150 (C4) 2 D25 (C7a) D16-100
(C7) D16-100 (C7a) D16-100 (C7) D16-100 (C7a) D16-100 (C7) D16-100
DETAIL JOINT PANEL 4
SKALA 1 : 25 - Ir.Jodi Firmansjah,MSE,Phd Andy Maruli H.

DIPERIKSA OLEH :

TIPIKAL TULANGAN CAPPING BEAM 9M 1


SKALA 1 : 50 -
PT. CIPTA STRADA
ENGINEERING CONSULTANS

Ir. M. Zahir Siregar

DISETUJUI OLEH :

CB CB JAYA PRATAMA
Heny Mayawati, ST

GAMBAR PERENCANAAN
(J2) D16-100 (J1) 2xD25-150 (J2a) D16-100 (J1) 2xD25-150
JUDUL GAMBAR :

TIPIKAL TULANGAN CAPPING BEAM 9M


(C6) D16-100 (C6a) D16-100
(C1) D25-150 (C1) D25-150

(C3) 2 D25 (C3) 2 D25 (C3) 2 D25 (C3) 2 D25


(C2) D25-150 (C2) D25-150
(C7) D16-100 (C7) D16-100
(C7a) D16-100
CATATAN :
(C4) 2 D25 (C4) 2 D25 (C4) 2 D25 (C5) D25-150 (C4) 2 D25

POTONGAN 1 2 POTONGAN 2 3
SKALA 1 : 25 - SKALA 1 : 25 -
SKALA : 1:50

KODE GAMBAR NO. GAMBAR NO. LEMBAR JML. LEMBAR REVISI


JAYA PRATAMA

2 1 PEMBANGUNAN 6 (ENAM) RUAS JALAN TOL DALAM KOTA JAKARTA


- -
TAHAP 1 RUAS SEMANAN-SUNTER DAN SUNTER - PULO GEBANG
SEKSI A KELAPA GADING-PULO GEBANG (STA. 21+881 - STA. 31+168)

CL PILE CL ALINYEMEN CL PILE

9000
(J2) D16-100 (J2) D16-100
(J2a) D16-100 (J2a) D16-100 (J2) D16-100 (J2a) D16-100 (J2a) D16-100 TIM PERENCANA
PENYEDIA JASA KONSTRUKSI
(C6) D16-100 (C6a) D16-100 (C6) D16-100 (C6a) D16-100 (C6) D16-100
(C6a) D16-100 (C1) D25-150 (J1) 4 D25 (C6a) D16-100
6 D19

∅1
75
(T2) D16-150 CIPTA GRAHA ABADI JAYA
Engineering Consultant KONSTRUKSI
(T2) D16-150

350
(T1) 3 D16
D13-200
(T1) 3 D16

TIM PERENCANA KEPALA PROYEK

(C7a) D16-100 (C2) D25-150 (C3) 2 D25 (C5) D25-150 (C4) 2 D25 (C7a) D16-100
(C7) D16-100 (C7a) D16-100 (C7) D16-100 (C7a) D16-100 (C7) D16-100
DETAIL JOINT PANEL 4
SKALA 1 : 25 - Ir.Jodi Firmansjah,MSE,Phd Andy Maruli H.

DIPERIKSA OLEH :

TULANGAN CAPPING BEAM EJ 9M 1


SKALA 1 : 50 -
PT. CIPTA STRADA
ENGINEERING CONSULTANS

Ir. M. Zahir Siregar

DISETUJUI OLEH :

CB CB JAYA PRATAMA
Heny Mayawati, ST

GAMBAR PERENCANAAN
(J1) 4 D25 PELAT INJAK (J1) 4 D25 PELAT INJAK
(J2) D16-100 (J2) D16-100 JUDUL GAMBAR :

PIN MOVE D32 PIN MOVE D32


ANGKUR D25 ANGKUR D25
TULANGAN CAPPING BEAM EJ 9M
(C6) D16-100 (C8) D16-100 (C6a) D16-100 (C8) D16-100
(C1) D25-150 (C1) D25-150

(C3) 2 D25 (C3) 2 D25 (C3) 2 D25 (C3) 2 D25


(C2) D25-150 (C2) D25-150
(C7) D16-100 (C7) D16-100
(C7a) D16-100
CATATAN :
(C4) 2 D25 (C4) 2 D25 (C4) 2 D25 (C5) D25-150 (C4) 2 D25

POTONGAN 1 2 POTONGAN 2 3
SKALA 1 : 25 - SKALA 1 : 25 -
SKALA : 1:50

KODE GAMBAR NO. GAMBAR NO. LEMBAR JML. LEMBAR REVISI


1125-2000
VARIABEL 115

85 115 150
JAYA PRATAMA

350
1 2
- -
VAR 1700 S4 D13-200 S3 5D16 S1 6 D13 1700 VAR 190 195 195 270 275 PEMBANGUNAN 6 (ENAM) RUAS JALAN TOL DALAM KOTA JAKARTA
KI KA
TAHAP 1 RUAS SEMANAN-SUNTER DAN SUNTER - PULO GEBANG
SEKSI A KELAPA GADING-PULO GEBANG (STA. 21+881 - STA. 31+168)

R10
3 R10
3
POTONGAN 1 5
SKALA 1 : 25 -
S5 4 D32 180 6400 180 S5 4 D32
120 S6 D13-200 S2 D13-200 S7 D13-200 120 VARIABEL 115
TIM PERENCANA

85 115 150
LAYOUT TULANGAN 1 PENYEDIA JASA KONSTRUKSI

350
SKALA 1 : 50 -

70 245 195 244 196 175


KI KA CIPTA GRAHA ABADI JAYA
Engineering Consultant KONSTRUKSI

POTONGAN 2 6
1/5 L 3 1/5 L -
- SKALA 1 : 25
LIFTING POINT 2PC STRAND 12,7 MM
TIM PERENCANA KEPALA PROYEK

225 450 450

80 200 70
4 + 22 STRAND 12.7 MM = 7000
10 STRAND 0.5"

350
4 STRAND 0.5" (SHEATED)
LAYOUT PRESTRESS 2
SKALA 1 : 50 - 4895 95 80 110 115 75 95 95 95 95 125 Ir.Jodi Firmansjah,MSE,Phd Andy Maruli H.

DIPERIKSA OLEH :
POTONGAN 3 7
SKALA 1 : 25 -

KI 4 5 6 KI D13-150 K3
- - - PT. CIPTA STRADA
ENGINEERING CONSULTANS

4 STRAND 0.5" (SHEATED) 4 STRAND 0.5" S3 5-D16 S4 D13-200 Ir. M. Zahir Siregar
S6 D13-200 S2 D13-200 S7 D13-200 S6 D13-200
DISETUJUI OLEH :

D13-200 S2 S5 4 D32

D13-200 S7
10 STRAND 0.5"
6-D13 S1 4 STRAND 0.5" (SHEATED) JAYA PRATAMA
Heny Mayawati, ST

750 750
POTONGAN 4 8
KA 10 STRAND 0.5"
S1 6 D13
KA SKALA 1 : 25 - GAMBAR PERENCANAAN
1875 1875
D13-150 K3 JUDUL GAMBAR :
TULANGAN PANEL (BOTTOM LAYER) 3 4 STRAND 0.5" S3 5-D16 S4 D13-200
SKALA 1 : 50 - S6 D13-200

D13-200 S2 TIPIKAL TULANGAN PANEL PRECAST TIPE P1

D13-200 S7
S4 D13-200 10 STRAND 0.5"
6-D13 S1
POTONGAN 5 9
SKALA 1 : 25 -
CATATAN :
D13-150 K3
4 STRAND 0.5" S3 5-D16 S4 D13-200
S6 D13-200
2 STRAND 0.5" S3 5 D16 4 D32 S5 S5 4 D32
D13-200 S2

D13-200 S7
TULANGAN PANEL (UPPER LAYER) 4 10 STRAND 0.5"
SKALA 1 : 50 - 6-D13 S1 4 STRAND 0.5" (SHEATED)
SKALA : 1:50
POTONGAN 6 10 KODE GAMBAR NO. GAMBAR NO. LEMBAR JML. LEMBAR REVISI
SKALA 1 : 25 -
115 2020 115

85 115 150

85 115 150
1 2 JAYA PRATAMA
- -

350
VAR 1700 S4 D13-200 S3 10D16 S1 11D13 1700 VAR

3 R10 275 270 195 195 190 190 195 195 270 275
R1 0 3 PEMBANGUNAN 6 (ENAM) RUAS JALAN TOL DALAM KOTA JAKARTA

180 6400 180 2250 TAHAP 1 RUAS SEMANAN-SUNTER DAN SUNTER - PULO GEBANG
S5 9 D32 S5 9 D32 KI KA SEKSI A KELAPA GADING-PULO GEBANG (STA. 21+881 - STA. 31+168)
120 S6 D13-200 S2 D13-200 S7 D13-200 120 POTONGAN 1 5
SKALA 1 : 25 -
LAYOUT TULANGAN 1 115 2020 115
SKALA 1 : 50 -
TIM PERENCANA

85 115 150

85 115 150
1/5 L 3 1/5 L PENYEDIA JASA KONSTRUKSI

350
-

LIFTING POINT 2PC STRAND 12,7 MM

275 270 195 195 190 190 195 195 270 275
CIPTA GRAHA ABADI JAYA
Engineering Consultant KONSTRUKSI
4 + 22 STRAND 12.7 MM = 7000
14 STRAND 0.5"
KI POTONGAN 2 6 KA

SKALA 1 : 25 -
8 STRAND 0.5" (SHEATED)
LAYOUT PRESTRESS 2 TIM PERENCANA KEPALA PROYEK
SKALA 1 : 50 - 450 450 450 450 450

80 200 70
350
4 5 6
KI - - - KI

S6 D13-200 S2 D13-200 S7 D13-200 8 STRAND 0.5" (SHEATED)


125 95 95 95 95 75 115 110 80 95 95 95 95 95 80 110 115 75 95 95 95 95 125 Ir.Jodi Firmansjah,MSE,Phd Andy Maruli H.

DIPERIKSA OLEH :
POTONGAN 3 7
SKALA 1 : 25 -

PT. CIPTA STRADA


ENGINEERING CONSULTANS

9 D32 S5 S3 10-D16 S4 D13-200 4 STRAND 0.5"


Ir. M. Zahir Siregar
S6 D13-200
DISETUJUI OLEH :

D13-200 S2 14 STRAND 0.5"


S1 11-D13
750 750 8 STRAND 0.5" (SHEATED) JAYA PRATAMA
KA 22 STRAND 0.5" KA S7 D13-200 Heny Mayawati, ST
1875 S1 11 D13 1875 POTONGAN 4 8
SKALA 1 : 25 - GAMBAR PERENCANAAN
TULANGAN PANEL (BOTTOM LAYER) 3 JUDUL GAMBAR :
SKALA 1 : 50 -
S3 10-D16 S4 D13-200 4 STRAND 0.5"
S6 D13-200
S4 D13-200
TIPIKAL TULANGAN PANEL PRECAST TIPE P2

S2 D13-200 22 STRAND 0.5" S1 11-D13


S7 D13-200
POTONGAN 5 9
SKALA 1 : 25 - CATATAN :

S3 10-D16 S4 D13-200 S5 9 D32 4 STRAND 0.5"


S6 D13-200

4 STRAND 0.5" S3 10 D16 9 D32 S5


D13-200 S2 18 STRAND 0.5"
S7 D13-200 S1 11-D13
4 STRAND 0.5" (SHEATED)
SKALA : 1:50
TULANGAN PANEL (UPPER LAYER) 4 POTONGAN 6 10 KODE GAMBAR NO. GAMBAR NO. LEMBAR JML. LEMBAR REVISI
SKALA 1 : 50 - -
SKALA 1 : 25
1125-2000
VARIABEL 115

85 115 150
JAYA PRATAMA

350
2 1
- -
S4 D13-200 S3 5D16 S1 6 D13 1700 VAR 190 195 195 270 275 PEMBANGUNAN 6 (ENAM) RUAS JALAN TOL DALAM KOTA JAKARTA
KI KA
TAHAP 1 RUAS SEMANAN-SUNTER DAN SUNTER - PULO GEBANG
SEKSI A KELAPA GADING-PULO GEBANG (STA. 21+881 - STA. 31+168)
R10
3
POTONGAN 1 5
SKALA 1 : 25 -
180 6400 180 S5 4 D32
120 S6 D13-200 S2 D13-200 S7 D13-200 120 VARIABEL 115
TIM PERENCANA

85 115 150
LAYOUT TULANGAN 1 PENYEDIA JASA KONSTRUKSI

350
SKALA 1 : 50 -

70 245 195 244 196 175


KI KA CIPTA GRAHA ABADI JAYA
Engineering Consultant KONSTRUKSI

POTONGAN 2 6
1/5 L 3 1/5 L -
- SKALA 1 : 25
LIFTING POINT 2PC STRAND 12,7 MM
TIM PERENCANA KEPALA PROYEK

225 450 450

80 200 70
4 + 22 STRAND 12.7 MM = 7000
10 STRAND 0.5"

350
4 STRAND 0.5" (SHEATED)
LAYOUT PRESTRESS 2
SKALA 1 : 50 - 4895 95 80 110 115 75 95 95 95 95 125 Ir.Jodi Firmansjah,MSE,Phd Andy Maruli H.

DIPERIKSA OLEH :
POTONGAN 3 7
SKALA 1 : 25 -

KI 6 5 4 KI D13-150 K3
- - - PT. CIPTA STRADA
ENGINEERING CONSULTANS

4 STRAND 0.5" (SHEATED) 4 STRAND 0.5" S3 5-D16 S4 D13-200 Ir. M. Zahir Siregar
S6 D13-200 S2 D13-200 S7 D13-200 S6 D13-200
DISETUJUI OLEH :

D13-200 S2 S5 4 D32

D13-200 S7
10 STRAND 0.5"
6-D13 S1 4 STRAND 0.5" (SHEATED) JAYA PRATAMA
Heny Mayawati, ST

750
POTONGAN 4 8
KA 10 STRAND 0.5"
S1 6 D13
KA SKALA 1 : 25 - GAMBAR PERENCANAAN
1875
D13-150 K3 JUDUL GAMBAR :
TULANGAN PANEL (BOTTOM LAYER) 3 4 STRAND 0.5" S3 5-D16 S4 D13-200
SKALA 1 : 50 - S6 D13-200

D13-200 S2 TIPIKAL TULANGAN PANEL PRECAST TIPE P1a

D13-200 S7
S4 D13-200 10 STRAND 0.5"
6-D13 S1
POTONGAN 5 9
SKALA 1 : 25 -
CATATAN :
D13-150 K3
4 STRAND 0.5" S3 5-D16 S4 D13-200
S6 D13-200
2 STRAND 0.5" S3 5 D16 4 D32 S5 S5 4 D32
D13-200 S2

D13-200 S7
TULANGAN PANEL (UPPER LAYER) 4 10 STRAND 0.5"
SKALA 1 : 50 - 6-D13 S1 4 STRAND 0.5" (SHEATED)
SKALA : 1:50
POTONGAN 6 10 KODE GAMBAR NO. GAMBAR NO. LEMBAR JML. LEMBAR REVISI
SKALA 1 : 25 -
115 2020 115

85 115 150

85 115 150
2 1 JAYA PRATAMA
- -

350
S4 D13-200 S3 10D16 S1 11D13 1700 VAR

R10 275 270 195 195 190 190 195 195 270 275
3 PEMBANGUNAN 6 (ENAM) RUAS JALAN TOL DALAM KOTA JAKARTA

180 6400 180 2250 TAHAP 1 RUAS SEMANAN-SUNTER DAN SUNTER - PULO GEBANG
S5 9 D32 KI KA SEKSI A KELAPA GADING-PULO GEBANG (STA. 21+881 - STA. 31+168)
120 S6 D13-200 S2 D13-200 S7 D13-200 120 POTONGAN 1 5
SKALA 1 : 25 -
LAYOUT TULANGAN 1 115 2020 115
SKALA 1 : 50 -
TIM PERENCANA

85 115 150

85 115 150
1/5 L 3 1/5 L PENYEDIA JASA KONSTRUKSI

350
-

LIFTING POINT 2PC STRAND 12,7 MM

275 270 195 195 190 190 195 195 270 275
CIPTA GRAHA ABADI JAYA
Engineering Consultant KONSTRUKSI
4 + 22 STRAND 12.7 MM = 7000
14 STRAND 0.5"
KI POTONGAN 2 6 KA

SKALA 1 : 25 -
8 STRAND 0.5" (SHEATED)
LAYOUT PRESTRESS 2 TIM PERENCANA KEPALA PROYEK
SKALA 1 : 50 - 450 450 450 450 450

80 200 70
350
4 5 6
KI - - - KI

S6 D13-200 S2 D13-200 S7 D13-200 8 STRAND 0.5" (SHEATED)


125 95 95 95 95 75 115 110 80 95 95 95 95 95 80 110 115 75 95 95 95 95 125 Ir.Jodi Firmansjah,MSE,Phd Andy Maruli H.

DIPERIKSA OLEH :
POTONGAN 3 7
SKALA 1 : 25 -

PT. CIPTA STRADA


ENGINEERING CONSULTANS

9 D32 S5 S3 10-D16 S4 D13-200 4 STRAND 0.5"


Ir. M. Zahir Siregar
S6 D13-200
DISETUJUI OLEH :

D13-200 S2 14 STRAND 0.5"


S1 11-D13
750 8 STRAND 0.5" (SHEATED) JAYA PRATAMA
KA 22 STRAND 0.5" KA S7 D13-200 Heny Mayawati, ST
S1 11 D13 1875 POTONGAN 4 8
SKALA 1 : 25 - GAMBAR PERENCANAAN
TULANGAN PANEL (BOTTOM LAYER) 3 JUDUL GAMBAR :
SKALA 1 : 50 -
S3 10-D16 S4 D13-200 4 STRAND 0.5"
S6 D13-200
S4 D13-200
TIPIKAL TULANGAN PANEL PRECAST TIPE P2a

S2 D13-200 22 STRAND 0.5" S1 11-D13


S7 D13-200
POTONGAN 5 9
SKALA 1 : 25 - CATATAN :

S3 10-D16 S4 D13-200 S5 9 D32 4 STRAND 0.5"


S6 D13-200

4 STRAND 0.5" S3 10 D16 9 D32 S5


D13-200 S2 18 STRAND 0.5"
S7 D13-200 S1 11-D13
4 STRAND 0.5" (SHEATED)
SKALA : 1:50
TULANGAN PANEL (UPPER LAYER) 4 POTONGAN 6 10 KODE GAMBAR NO. GAMBAR NO. LEMBAR JML. LEMBAR REVISI
SKALA 1 : 50 - -
SKALA 1 : 25

Anda mungkin juga menyukai