No No Jembatan Nama Jembatan

1 1 Renovasi Jembatan Cirendeu Desa Sukabungah

2 9 Kali Cibungur

3 18 Babakan Kaum, Desa Madalkrisna

4 12 Emin Ranta

5 4 Tegal Kadu

6 98 SMK Dewantara, Desa Hegarmukti

7 77 Cipayung

8 74 Cipayung, Gandaria-Buniherang

9 8 Depan Ibu Nara, Desa Karangsari

10 63 Pasar Renggas

11 Cikadu

12 Jl. Serang Setu


13 Jl. Cempaka

14 SMPN4 Cibarusah

15 Bu Nunung

16 Kadungwaringin

17 23 BP. Nibun

18 25 BP. Hendi

19 26 Kali Bolang Kecil

20 27 Tamin

21 24 Kali Kiwing

22 31 Irigasi gang cunang

23 34 Gang Kiwil
24 30 Gang endo

25 35 Kp. Kobak Makmur, Desa Sumber Sari

26 72 Desa Karanghau

27 51 Karangpatri

28 101 Anggrek

29 SMPN 5
30 8 Kali Jambe
31 11 Kali Jambe

32 63 Pasar Rengas

33 Taman Rahayu

34 99 Cikarageman

35 118 TS

36 14 H. Basuki
37 116 Umar Nadi

38 Sadil

39 117 Keramik

40 53 Galian Bunut

41 109 Masjid jami Al Hidayah


42 108 Karanggetak
43 107 Karanggetak Rt 01/05
44 109 Masjid jami Al Hidayah ke-2

45 68 86 Tambelang

46 87 Kali Desar Pulodomar

47 67 Sasak goban

48 85 G. Piye

49 94 H.Namah

50 106 Kp.Jalen

51 2 Kali Busa

52 42 H.Idris

53 7 Srimukti-Srijaya

54 19 Rs.Tiara

55 100 Jl. Rambutan Raya


56 Jl. Irigasi RT 05/06 Kebalen

57 28 Tanggul Kebon Kalapa Ds. Sukaraya

58 96 Jembatan Bp Maat

59 95 Jembatan Hj. Ranta

60 115 Jembatan TPU Sukaindah

61 60 Jembatan Jaya laksana

62 58 Jembatan Kp Garon

63 103 Jembatan Masjid Daarul Mukminin

64 47 Pendekat Jembatan Masjid Daarul Mukminin

65 5 Jembatan Ds. Suka budi

66 73 Jembatan Karangbahagia

67 - Jembatan Ciherang

68 90 Jembatan BP Rimin
69 Jembatan kp Kobak Rotan Suka Karya

70 93 Jembatan kp kobak rotan gg arif

71 50 Jembatan Desa Sulaksana

72 91 Jembatan DKp Kobak Lompong

73 71 Jembatan DKp Kobak Lompong

74 29 Jembatan Mandir Mirun

75 113 Jembatan Akses Stadion

76 1 Jembatan Kali Krobokan

77 1 Jembatan Kp Pondok

78 2 Pembangunan Jalan Pendekeat

79 13 Jembatan Kalen Tengah

80 21 Jembatan Gobatt Desa Pantai Bahagia


81 65 Jembatan Depan Kantor Desa

82 104 jembatan Kp Sunge Lebuh

83 105 Jembatan kec Muara Gembong

84 66 Jembatan RT 02 Rw 01

85 15 Jembatan kp Sawah

86 16 Jembatan Desa Pahlawan Setia

87 17 Jembatan Kecamatan Tarumajaya

89 80 Jembatan Kecamatan Tarumajaya

90 22 Jembatan kp Pisan Batu


Eksisting
Lokasi Kecamatan Tipe Penanganan Nilai Pekerjaan Lebar Bentang
(m) Total (m)

Bojongmangu Penggantian dan Pelebaran IDR 800,000,000.00 3 6

Bojongmangu Perbaikan Jalan dan DPT IDR 1,000,000,000.00 4.2 7

Bojongmangu Penggantian IDR 675,000,000.00 3 4.5

Bojongmangu Penggantian, DPT IDR 900,000,000.00 6 8

Cibarusah Pembuatan Baru IDR 50,000,000.00 2 3

Cikarang Pusat Rehab, DPT 5.2 6.2

Cikarang Timur Duplikasi jembatan baru IDR 2,000,000,000.00 3 26

Cikarang Timur Buat Baru IDR 1,500,000,000.00

Cikarang Timur Penggantian IDR 800,000,000.00 3 20

Cibitung Perbaikan IDR 300,000,000.00 5 22.5

Perbaikan Oprit 4.7 8.4

Penggantian Gorong-gorong 3.6 7


Gorong-gorong 3 5

Gorong-gorong 4 2

Pembuatan Baru

Kadungwaringin Rehab IDR 700,000,000.00 4.2 20.3

Pebayuran Pembuatan Baru IDR 337,500,000.00

Pebayuran Pembuatan Baru IDR 202,500,000.00

Pebayuran Pembuatan Baru IDR 337,500,000.00

Pebayuran Rehab IDR 405,000,000.00 2 19

Pebayuran Pelebaran IDR 450,000,000.00 1.5 19

Pebayuran Rehab IDR 450,000,000.00 3 14

Pebayuran Pembuatan Baru IDR 450,000,000.00


Pebayuran Pembuatan Baru IDR 450,000,000.00

Pebayuran Rehab IDR 600,000,000.00 5 5

Pebayuran Pembuatan Baru IDR 500,000,000.00

Pebayuran Pembuatan Baru IDR 500,000,000.00

Tambun Selatan Pembuatan Baru IDR 650,000,000.00

Pembuatan Baru
Tambun Selatan Rehab IDR 300,000,000.00 1+6+1 12
Tambun Selatan Pembuatan Baru IDR 5,000,000,000.00

Cibitung Perbaikan IDR 300,000,000.00 5 16+6

Pembuatan Baru

Rehab 3.5 5

Sukatani Rehab Total IDR 800,000,000.00 2 18.5

Sukatani Rehab Total IDR 900,000,000.00 3 12


Sukatani Rehab Total IDR 800,000,000.00 3 16.5

Sukatani Rehab Total IDR 400,000,000.00 1.1 20

Sukatani Rehab Total IDR 800,000,000.00 2 19

Sukakarya Rehab Total IDR 400,000,000.00 1.5 16

Sukawangi Rehab Total IDR 125,000,000.00 5 3


Sukawangi Rehab Total IDR 125,000,000.00 3 3.5
Sukawangi Rehab Total IDR 125,000,000.00 2 2.5
Sukawangi Rehab Total IDR 125,000,000.00 2 3

Tambelang Rehab Total IDR 450,000,000.00 4.5 10

Tambelang Rehab Total IDR 250,000,000.00 3 6

Tambelang Pelebaran IDR 125,000,000.00 3.2 3.7

Tambelang Buat Baru IDR 100,000,000.00 2 2.5

Tambelang Rehab Total IDR 250,000,000.00 3.5 2.2

Tambun Utara Rehab Total IDR 600,000,000.00 3 4

Tambun Utara Pelebaran IDR 2,000,000,000.00 7 14

Tambun Utara Rehab Total IDR 200,000,000.00 4.5 4.5

Tambun Utara Rehab Total IDR 100,000,000.00 3 3

Babelan Rehab Total IDR 800,000,000.00 9.5 6

Tambun Selatan Pelebaran IDR 30,000,000.00 1 6


Babelan Rehab Total IDR 450,000,000.00 1.6 8.5

Karang Bahagia Pembangunan Jembatan

Tambelang Pembangunan Jembatan 2 4

Tambelang Pembangunan Jembatan 3.2 2.5

Sukakarya Pembangunan Jembatan

Cabang Bungin Jembatan Baru 2 7.8

Cabang Bungin Jembatan Baru 1.3 9

Sukawargi Jembatan Baru 2 12

Sukawargi JalAn Pendekat

Sukawargi Jembatan baru 2.5 3

Karangbahagia Jembatan baru 4.15 6.8

Karangbahagia Peninggian Jembatan 3.5 32.5

Suka Karya Buat jembatan baru 1.6 6


Buat jembatan baru 3 12 12

Suka Karya Buat jembatan baru 1.5 15

Suka Karya Buat jembatan baru -

Suka Karya Buat jembatan baru 3.8 8.5

Suka Karya Rehab

Karangbahagia Rehab+pelebaran

Karangbahagia Jembatan Baru

Cikarang Barat Rehab Total 4 6

Muara Gembong Rehab Total 1.2 7

Muara Gembong Bangun Jalan Pendekat

Muara Gembong Rehab Total 2.5 7

Muara Gembong Rehab Total 3 10.5


Muara Gembong Jembatan Baru

Muara Gembong Rehab Total 1.6 7

Muara Gembong Jembatan Baru

Sukaringin Rehab Total 1.8 1.6

Tarumajaya Rehab Total 3.5 5

Tarumajaya Rehab Total 3 14

Tarumajaya Rehab Total 3.5 4.5

Tarumajaya Rehab Total 1.5 13

Pebayuran Jembatan Baru 2 21


Eksisting Rencana
Bentang (m) Lebar Bentang Bentang (m)
1 2 3 4 5 6 (m) Total (m) 1 2 3 4 5 6

6 4 6 6

4.2 7

4.5 6 18 9 9

8 6 8 8

3 3 3 3

6.2 5.2 6.2 6.2

7.7 8 7.7 3.5 24.5 8.2 8.2 8.2

3.5 21 7 7 7

3 20 10 10

2 4.5

8.4 4.7 8.4 8.4

7 3.6 7 7
3 5

4 2

3 6 6

3.4 3.4 3.4 3.4 3.4 3.4 4.2 20.3 5.075 5.075 5.075 5.075

2 13.5 6.75 6.75

2 8.5 8.5

2 17 8.5 8.5

6.5 12.5 2 19 9.5 9.5

9 10 2.5 19 9 10

14 3 14 7 7

3 18 9 9
3 16 8 8

2.5 2.5 5 5 5

3 12.5 6.25 6.25

2.5 23 11.5 11.5

3 18 9 9

4 7
1+6+1 12
1+6+1

5 16+6

3 3

3.5 5

18.5 2 18.5 18.5

12 4 13 13
16.5 3 16.5 16.5

20 1.6 18 18

19 2.5 19 19

8 8 2.5 16 8 8

3 5 3 3
3.5 3 3.5 3.5
2.5 2 2.5 2.5
3 2 3 3

10 5 10 10

6 3 6 6

3.7 4.2 3.7 3.7

2.5 2 2.5 2.5

2.2 4 2.5 2.5

4 5 5 5

14 16.5 17 17

4.5 5 5 5

3 3 3 3

6 9.5 6 6

6 1.5 6 6
8.5 3.5 8.5 8.5

3 16 16

4 2.5 4 4

3.5 3

6 6

7.8 2 7.8 7.8

9 2 9 9

12 2 12 12

3 3 3 3

6.8 6 7 7

5.7 5.7 5.7 5.7 5.7 3.5 32.5 5.7 5.7 5.7 5.7 5.7

6 2.5 6 6
3 12 12

3 15 15

4 14 14

4.5 4 6 9 9

10 12 12

6 4 6 6

7 3 7 7

7 3 7 7

3 4.5 3 3 11 11
3 15 15

7 3 8 8

2 10

1.6 3 2.5

4 5

14 4 14 14

4.5 5 5 5

5 6 1.5 12 12

2 21 10.50 10.50
Pengelompokan
Keterangan Tipe Struktur
berdasarkan Girder

● DPT ganti beton (eksisting batu kali) ● Abutmen


● Pondasi Dalam ● IWF 300
● Box Culvert ● Slab 250
● Finish Grade + 0.6m ● DPT IWF 300
● Pembuatan Oprit 20m

● Pembuatan DPT Beton/sheetpile 30m + 10m ● DPT


● Pemadatan Tanah
● Pengalihan Aliran Sungai

● DPT ● Abutmen
● Struktur Jembatan Baja ● Pilar
● Jalan Pendekat 10m+10m ● IWF 400
● Slab 250 IWF 400
● DPT

● DPT Batu kali ● Abutmen


● Finish Grade + 0.2m ● IWF 300
● Slab 250 IWF 300
● DPT

● Buat baru disamping eksisting ● Box Culvert Box/Flat Slab


● Rehab Railling ● DPT
● DPT batu kali ±10m ● Penebalan Slab
● penambahan slab jembatan

● Jalan pendekat (Beton) ● Abutmen


● Rehab jembatan eksisting ● Pilar (2)
● Pembersihan lahan ● IWF 400 IWF 400
● Slab 250

● Oprit 15m ● Abutmen


● DPT ● Pilar (2)
● IWF 300
● Slab 250 IWF 300
● DPT

● Struktur Baja ● Abutmen


● Elevasi jembatan ditambah 1.5m ● Pilar
● Perkerasan bukan prioritas ● IWF 400 IWF 400
● DPT bukan prioritas ● Slab 250

● Sebagian bongkar + ganti ● DPT


● Normalisasi
● DPT Sheet pile
● Box Culvert

● Oprit 10+10m
● Penggantian gorong-gorong ● Box Culvert
● menggunakan box culvert Box/Flat Slab
● Gorong-gorong ● Box Culvert
● Diganti Box culvert Box/Flat Slab
● Gorong-gorong ● Flat Slab/Box
● Diganti Box culvert Box/Flat Slab
● Buat Baru ● Abutmen
● IWF 300 IWF 300
● Slab 250

● 1 Pilar yang rusak ● Abutmen


● Slab diperkuat ● Pilar (3)
● Pembuatan DPT ● IWF 300
● Slab 250 IWF 300
● DPT

● Jembatan akses ke sawah ● Abutmen


● Pilar
● IWF 250 IWF 250
● Slab 250

● Jembatan akses ke sawah ● Abutmen


● IWF 300 IWF 300
● Slab 250

● Jembatan akses ke sawah ● Abutmen


● Pilar
● IWF 250 IWF 250
● Slab 250

● Buat RTW abutmen ● Abutmen


● DPT untuk tanggul ● IWF 400
● Slab 250 IWF 400
● DPT

● Jembatan balok baja + pilar beton ● Abutmen


● DPT ● Pilar
● IWF 400
● Slab 250 IWF 400
● DPT

● DPT ● Abutmen
● Wingwall ● Pilar
● Jalan pendekat 15m ● IWF 300
● Slab 250 IWF 300
● DPT

● Wingwall ● Abutmen
● Pilar
● IWF 400
● Slab 250 IWF 400
● DPT
● Perkerasan jalan pendekat ● Abutmen
● DPT ● Pilar
● IWF 300
● Slab 250 IWF 300
● DPT

● T slab beton 2.7m ● Abutmen


● IWF 250 IWF 250
● Slab 250

● Jembatan akses ke sawah ● Abutmen


● DPT ● Pilar
● IWF 250
● Slab 250
● DPT

● Jembatan akses ke sawah ● Abutmen


● Pilar
● IWF 250
● Slab 250
● DPT

● Oprit ke anggrek 25m ● Abutmen


● Oprit ke mekarsari 22m ● Pilar
● Sheetpile 22m ● IWF 400
● Slab 250 IWF 400
● DPT/Sheet Pile

● Box Culvert ● Box Culvert Box/Flat Slab


● Pengalihan drainase ke kanan A1 ● DPT
● Ingin menggunakan girder
● Box Culvert 3 cell
● 6m plat injak
● Alt1 Penggantian jembatan menggunakan IWF
● Perbaikan Plat injak (amblas)

● Flat Slab/Box Box/Flat Slab


● Bronjong sekitar sungai
● Hotmix oprit 80m
● Pelebaran jadi 2m ● Abutmen
● Peninggian Jembatan ● IWF 600
● Normalisasi ● Slab 250 IWF 600
● Usahakan tidak ada pilar tengah

● Peninggian Jembatan ● Abutmen


● Pelebaran jadi 4m ● IWF 450
● Jalan pendekat 10+10m ● Slab 250
● Usahakan tidak ada pilar tengah ● DPT IWF 450
● DPT 10+10m
● Usahakan tidak ada pilar tengah ● Abutmen
● DPT 10+10m ● IWF 600
● Jalan pendekat 16+10m ● Slab 250
● Struktur jembatan baja ● DPT IWF 600
● Peninggian Jembatan (3m FG)

● Jalan pendekat 30+5m ● Abutmen


● Usahakan tidak ada pilar tengah ● IWF 600 IWF 600
● DPT optional kalau ada anggaran sisa ● Slab 250

● Jalan pendekat 27+13m ● Abutmen


● DPT/sheet pile ● IWF 600
● Jembatan Fungsional ● Slab 250 IWF 600
● DPT

● Abutmen
● Pilar
● IWF 300 IWF 300
● Slab 250

● Jembatan dinaikin 30cm ● Flat Slab/Box Box/Flat Slab


● Jembatan dinaikin 30cm ● Flat Slab/Box Box/Flat Slab
● Jembatan dinaikin 20cm ● Flat Slab/Box Box/Flat Slab
● Jembatan dinaikin 30cm ● Flat Slab/Box Box/Flat Slab
● 2 nama sama Rencana dibuat 1 ● Abutmen
● IWF 400 IWF 400
● Slab 250

● Hanya Girder+slab yag rusak ● IWF 300


● Buat tanggul ● Slab 250 IWF 300
● Pelebaran 50cm kanan kiri ● Flat Slab/Box
● Buat tapper untuk mobil masuk jembatan Box/Flat Slab
● ada pengecoran beton untuk jalan

● Jembatan akses warga ● Flat Slab/Box


● Perkuatan jalan pendekat 2+2m Box/Flat Slab
● Cor beton jalan pendekat ● Flat Slab/Box
● Jembatan dinaikin 30cm Box/Flat Slab
● Jembatan dibuat satu elv dengan jalan ● Abutmen
● Kemungkinan saluran digeser kanan/kiri ● IWF 250 IWF 250
● Slab 250

● Box Culvert double cell ● Box Culvert 2 cells


● Pelebaran 7.5m dari sisi abutment Box/Flat Slab
● Penggantian Box ● Box Culvert Box/Flat Slab
● Dinaikan 0.5m ● Flat Slab/Box
● Pembersihan Area Jembatan Box/Flat Slab
● Peninggian Abutment 0.5m ● Abutmen
● Penggantian Railling ● IWF 300 IWF 300
● DPT Hancur ● Slab 250
● DPT ● Abutmen
● IWF 400
● Slab 250 IWF 400
● DPT

● Jembatan Baru ● Abutmen


● IWF 600
● Slab 250 IWF 600
● DPT

● Jembatan Baru berupa Box ● Box Culvert Box/Flat Slab


● Box
● Dibbuat Jalan pendekat ● Box Culvert Box/Flat Slab

● Jembatan Baru ● Abutmen


● Dibbuat Jalan pendekat ● IWF 300
● Bangun Box Drainase ● Slab 250 IWF 300
● Box Drainase 1 x1

● Jembatan Baru ● Abutmen


● Dibbuat Jalan pendekat ● IWF 300
● Slab 250 IWF 300

● Jembatan Baru ● Abutmen


● Dibbuat Jalan pendekat ● IWF 300
● Slab 250 IWF 300

● Jembatan Baru ● Abutmen


● Dibbuat Jalan pendekat ● IWF 450
● Slab 250 IWF 450

● Jalan Pendekat ● Perkerasan Beton 250


mm -
● Jembatan Baru berupa Box ● Box Culvert Box/Flat Slab
● Jembatan Baru ● Abutmen
● Bongkar Jembatan Eksisting ● IWF 300
● Slab 250 IWF 300

● Jembatan Eksisting Dtinggikan


● Pilar ditinggikan 50cm sehingga FG selevel dengan
Eksisting Sebelahnya

● Jembatan Baru ● Abutmen


● IWF 300
● Slab 250 IWF 300
● Jembatan Baru ● Abutmen
● IWF 450
● Slab 250 IWF 450

● Jembatan Baru ● Abutmen


● Tinggikan 50cm ● IWF 600
● Slab 250 IWF 600

● Jembatan Baru ● Abutmen


● Tinggikan 50cm dari Eksisting ● IWF 600
● Buat Jalan Pendekat 32 m dan 5 m ● Slab 250 IWF 600

● Jembatan Baru ● Abutmen


● Dibbuat Jalan pendekat ● IWF 400
● Bangun DPT ● Slab 250 IWF 400
● DPT

Cor Slab, Rehab Jembatan


(Gambar Box Existing dan tambahkan
Railing+overlay+jalan pendekat
perbaiki Saluran

● Jembatan Baru ● Abutmen


● Dibbuat Jalan pendekat ● IWF 450
● Bangun DPT ● Slab 250 IWF 450
● DPT

● Jembatan Boc Baru


● Perbaiki Jalan pendekat ● Box Culvert 2 cells flat slab batukali
● Jembatan Boc Baru
● Bangun DPT ● Box Culvert 2 cells box culvert
● Buat Jalan pendekat

● Cor Jalan Pendekat ● Perkerasan Beton 250


mm
● Jembatan Baru ● Abutmen
● Dibbuat Jalan pendekat ● IWF 400
● Bangun DPT ● Slab 250 IWF 400
● DPT

● Jembatan Baru ● Abutmen


● Dibbuat Jalan pendekat ● IWF 450
● Bangun DPT ● Slab 250
● DPT IWF 450
● Jembatan Baru ● Abutmen
● Dibbuat Jalan pendekat ● IWF 600
● Bangun DPT ● Slab 250
● DPT IWF 600

● Jembatan Boc Baru


● Buat Jalan pendekat ● Box Culvert 2 cells box culvert
● Jembatan Baru ● Abutmen tanpa pondasi
● Bangun DPT ● IWF 400
● Slab 250
● DPT IWF 400

● Jembatan Boc Baru


● Bangun DPT ● Box Culvert flat slab batukali
● Buat Jalan pendekat

● Jembatan Boc Baru


● Bangun DPT
● Buat Jalan pendekat
● Buat Railingt ● Box Culvert t=0.5m box culvert

● Jembatan Baru ● Abutmen


● Tinggikan 1m dari Eksisting ● IWF 600
● Buat Jalan Pendekat ● Slab 250 IWF 600

● Jembatan Boc Baru


● Bangun DPT
● Buat Jalan pendekat
● Buat Railingt ● Box Culvert t=0.5m box culvert

● Jembatan Baru ● Abutmen


● Dibbuat Jalan pendekat ● IWF 450
● Slab 250 IWF 450

● Jembatan Baru ● Abutmen


● Dibbuat Jalan pendekat ● Pilar
● Bangun DPT ● IWF 450
● Slab 250
DPT IWF 450
Survey
FASE 1
FASE 1
FASE 2
FASE 3
TIPIKAL GIRDER
Bentang Tipikal Profil Rasio Disebut
3 Flat Slab/Box
4
5 IWF 250x125x6x9 0.50 IWF 250
5
6
7 8 IWF 300x150x6.5x9 0.90 IWF300
8
9
10 IWF 400x200x8x13 0.70 IWF 400
10
13 13 IWF 450x200x9x14 0.99 IWF 450
17
18 19 IWF 60x200x11x17 0.8 IWF 600
19
Kuat 1A Active Add 1.3 1.3 2 1.8
Kuat 3A Active Add 1.3 1.3 2 1.8
Kuat 5A Active Add 1.3 1.3 2 1.8
Layan 1A Active Add 1 1 1 1
Ekstrm UP Unfact 1A Active Add 1 1 1
Ekstrim UP fact 1A Active Add 1.3 1.3 2
JADWAL DAN TARGET PEKERJA

Bulan Hari Tanggal Acara


Andre
• Laporan Pendahuluan
Selasa 13 • Desain Pilar dan ABT
Rabu 14 • PPT untuk ekspose
Kamis 15 Ekspose
Jumat 16
• Revisi Desian hasil Ekspose
• Kelompokan jembatan
Sabtu 17 berdasarkan tipe penanganan

• Laporan Akhir
Minggu 18 • Desain yang belum
• Laporan Akhir
Senin 19 • Desain yang belum
• Laporan Akhir
Selasa 20 • Desain yang belum
• Laporan Akhir
Oktober Rabu 21 • Desain yang belum
• Laporan Akhir
Kamis 22 • Desain yang belum
• Laporan Akhir
Jumat 23 • Desain yang belum
• Laporan Akhir
Sabtu 24 • Desain yang belum
• Laporan Akhir
Minggu 25 • Desain yang belum
• Deadline Laporan Akhir
Senin 26

Selasa 27 Deadline Laporan Akhir • Submit Laporan Akhir


Rabu 28
Kamis 29
Jumat 30
Sabtu 31
Minggu 1
November Senin 2
Selasa 3 Batas Akhir Kontrak
AL DAN TARGET PEKERJAAN

Target Pekerjaan
Lingga Iqbal Poetra
• Desain Tipikal Girder • Detail Gambar 3 Jembatan • Laporan Survey (Awal)
• Shedule Pekerjaan
• PPT untuk Ekspose • Revisi gambar 3 jembatan • RAB 3 Jembatan
• Ekspose • Ekspose
• Gambar detail 9 Jembatan • RAB 9 Jembatan
• Revisi Desian hasil Ekspose • Gambar detail 9 Jembatan • RAB 9 Jembatan
• Kelompokan jembatan
berdasarkan tipe penanganan

• Laporan Akhir • Gambar detail 9 Jembatan • RAB 9 Jembatan


• Desain yang belum
• Laporan Akhir • Gambar detail 9 Jembatan • RAB 9 Jembatan
• Desain yang belum
• Laporan Akhir • Gambar detail 9 Jembatan • RAB 9 Jembatan
• Desain yang belum
• Laporan Akhir • Gambar detail 9 Jembatan • RAB 9 Jembatan
• Desain yang belum
• Laporan Akhir • Gambar detail 9 Jembatan • RAB 9 Jembatan
• Desain yang belum
• Laporan Akhir • Gambar detail 9 Jembatan • RAB 9 Jembatan
• Desain yang belum • RKS
• Laporan Akhir • Gambar detail 9 Jembatan • RAB 9 Jembatan
• Desain yang belum • RKS
• Laporan Akhir • Gambar detail 9 Jembatan • RAB 9 Jembatan
• Desain yang belum • RKS
• Deadline Laporan Akhir • Gambar detail 3 Jembatan • RAB 9 Jembatan
• RKS
• Submit Laporan Akhir • Submit Laporan Akhir • Submit Laporan Akhir

Persiapan Rapat Akhir


No Task

Buat pengelompokan jembatan berdasarkan beban yang dilewati


1 1. Truk
2. Maksimum mobil penumpang
2 Desain Girder tipikal untuk jembatan penyebrangan ke sawah
3 Desain Flat Slab untuk jembatan sederhana