JADWAL PELAKSANAAN PEMBANGUNAN JALAN LINGKAR

Nama Paket : Paket Pembangunan Jalan Lingkar Timur Kuningan


Tanggal Kontrak : HK0203/PJNWil.III-JBR/LTK/XII/2019/460
Nomor Kontrak : 16 Desember 2019
Tahun Anggaran : 2019-2020
Kontraktor : PT. SENECA INDONESIA
Konsultan : PT. WAHANA MITRA AMERTA, PT. HI-WAY INDOTEK KONSULTAN, PT. CITRA NUSAWIDYA CONSULT, PT. GARIS PUTIH SEJAJAR (KSO)
Waktu Pelaksanaan : 360 (Tiga Ratus Enam Puluh) Hari Kalender

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
Perkiraan Bobot
No. Mata Pembayaran Uraian Satuan Harga Satuan Nilai Pekerjaan 16-Dec 23-Dec 30-Dec 6-Jan 13-Jan 20-Jan 27-Jan 3-Feb 10-Feb 17-Feb 24-Feb 2-Mar 9-Mar 16-Mar 23-Mar 30-Mar 6-Apr 13-Apr 20-Apr 27-Apr 4-May 11-May 18-May 25-May 1-Jun
Kuantitas (%)
s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d
22-Dec 29-Dec 5-Jan 12-Jan 19-Jan 26-Jan 2-Feb 9-Feb 16-Feb 23-Feb 1-Mar 8-Mar 15-Mar 22-Mar 29-Mar 5-Apr 12-Apr 19-Apr 26-Apr 3-May 10-May 17-May 24-May 31-May 7-Jun

DIVISI 1. UMUM
1.2 Mobiisasi Ls 1.00 402,795,000.00 402,795,000.00 0.500 0.0834 0.0834 0.0834 0.0834
1.8.(1) Manajemen dan Keselamatan Lalu Lintas Ls 1.00 115,200,000.00 115,200,000.00 0.143 0.0027 0.0027 0.0027 0.0027 0.0027 0.0027 0.0027 0.0027 0.0027 0.0027 0.0027 0.0027 0.0027 0.0027 0.0027 0.0027 0.0027 0.0027 0.0027 0.0027 0.0027 0.0027 0.0027 0.0027 0.0027
1.17.(1a) Pengujian pH Ls 3.00 490,050.00 1,470,150.00 0.002 0.0002 0.0002 0.0002 0.0002 0.0002
1.17.(1b) Pengujian Oksigen Terlarut (DO) Ls 3.00 490,050.00 1,470,150.00 0.002 0.0002 0.0002 0.0002 0.0002 0.0002
1.17.(1c) Pengujian Zat Padar Terlarut (TDS) Ls 3.00 490,050.00 1,470,150.00 0.002 0.0002 0.0002 0.0002 0.0002 0.0002
1.17.(1d) Pengujian Zat Padat Tersuspensi (TSS) Ls 3.00 561,000.00 1,683,000.00 0.002 0.0002 0.0002 0.0002 0.0002 0.0002
1.17.(1e) Pengujian Biological Oxygen Demand (BOD) Ls 3.00 676,500.00 2,029,500.00 0.003 0.0002 0.0002 0.0002 0.0002 0.0002
1.17.(1f) Pengujian Chemical Oxygen Demand (COD) Ls 3.00 676,500.00 2,029,500.00 0.003 0.0002 0.0002 0.0002 0.0002 0.0002
1.17.(1g) Pengaujian Coliform Ls 3.00 874,500.00 2,623,500.00 0.003 0.0003 0.0003 0.0003 0.0003 0.0003
1.17.(1h) Pengujian E Coli Ls 3.00 874,500.00 2,623,500.00 0.003 0.0003 0.0003 0.0003 0.0003 0.0003
1.17.(1i) Pengujian Destruksi Cu, Pb, Cd, Ni, Fe, Zn, Ag Co, Mn Ls 3.00 709,500.00 2,128,500.00 0.003 0.0002 0.0002 0.0002 0.0002 0.0002
1.17.(1j) Pengujian Temperatur (Suhu) Ls 3.00 490,050.00 1,470,150.00 0.002 0.0002 0.0002 0.0002 0.0002 0.0002
1.17.(2a) Pengujian Vibrasi Lingkungan untuk kenyamanan dan kesehatan Ls 3.00 2,145,000.00 6,435,000.00 0.008 0.0007 0.0007 0.0007 0.0007 0.0007
1.17.(2c) Pengujian parameter kebisingan dan atau getaran lainnya : ...... Ls 3.00 1,732,500.00 5,197,500.00 0.006 0.0005 0.0005 0.0005 0.0005 0.0005
1.17.(3a) Pengujian Nox Ls 3.00 940,500.00 2,821,500.00 0.004 0.0003 0.0003 0.0003 0.0003 0.0003
1.17.(3b) Pengujian Sulfurdoksida (SO2) Ls 3.00 940,500.00 2,821,500.00 0.004 0.0003 0.0003 0.0003 0.0003 0.0003
1.17.(3c) Pengujian Karbondioksida (CO2) Ls 3.00 940,500.00 2,821,500.00 0.004 0.0003 0.0003 0.0003 0.0003 0.0003
1.17.(3d) Pengujian Hidro Carbon (HC) - CH4 Ls 3.00 1,188,000.00 3,564,000.00 0.004 0.0004 0.0004 0.0004 0.0004 0.0004
1.17.(3f) Pengujian Total Partkulat (TSP) - Debu Ls 3.00 940,500.00 2,821,500.00 0.004 0.0003 0.0003 0.0003 0.0003 0.0003
1.19 Keselamatan dan Kesehatan Kerja Ls 1.00 167,304,000.00 167,304,000.00 0.208 0.0039 0.0039 0.0039 0.0039 0.0039 0.0039 0.0039 0.0039 0.0039 0.0039 0.0039 0.0039 0.0039 0.0039 0.0039 0.0039 0.0039 0.0039 0.0039 0.0039 0.0039 0.0039 0.0039 0.0039 0.0039
1.21 Manajemen Mutu Ls 1.00 89,550,000.00 89,550,000.00 0.111 0.0021 0.0021 0.0021 0.0021 0.0021 0.0021 0.0021 0.0021 0.0021 0.0021 0.0021 0.0021 0.0021 0.0021 0.0021 0.0021 0.0021 0.0021 0.0021 0.0021 0.0021 0.0021 0.0021 0.0021 0.0021

DIVISI 2. DRAINASE
2.1.(1) Galian Untuk Selokan Drainase dan Saluran Air M3 17,973.00 47,600.00 855,514,800.00 1.063 0.0354 0.0354 0.0354 0.0354 0.0354 0.0354 0.0354 0.0354 0.0354 0.0354 0.0354 0.0354 0.0354 0.0354 0.0354 0.0354 0.0354
2.3.(7) Gorong-gorong Pipa Beton Bertulang, diameter dalam 100 cm' M1 118.00 1,734,800.00 204,706,400.00 0.254 0.0424 0.0424 0.0424 0.0424 0.0424 0.0424
2.3.(22) Saluran Berbentuk U Tipe DS 1 M1 3,400.00 214,700.00 729,980,000.00 0.907 0.0432 0.0432 0.0432 0.0432 0.0432 0.0432 0.0432 0.0432 0.0432 0.0432 0.0432 0.0432 0.0432 0.0432 0.0432
2.3.(26) Saluran Berbentuk U Tipe DS 3 M1 10,945.00 1,056,400.00 11,562,298,000.00 14.364 0.3990 0.3990 0.3990 0.3990 0.3990 0.3990 0.3990 0.3990 0.3990 0.3990 0.3990

DIVISI 3. PEKERJAAN TANAH DAN GEOSINTETIK


3.1.(1) Galian Biasa M3 633,125.00 20,100.00 12,725,812,500.00 15.809 0.4940 0.4940 0.4940 0.4940 0.4940 0.4940 0.4940 0.4940 0.4940 0.4940 0.4940 0.4940 0.4940 0.4940 0.4940 0.4940 0.4940
3.1.(4) Galian Struktur Dengan Kedalaman 0-2 m M3 1,596.00 52,600.00 83,949,600.00 0.104 0.0130 0.0130 0.0130 0.0130 0.0130 0.0130 0.0130 0.0130
3.1.(5) Galian Struktur Dengan Kedalaman 2-4 m M3 1,197.00 304,400.00 364,366,800.00 0.453 0.0566 0.0566 0.0566 0.0566 0.0566 0.0566 0.0566 0.0566
3.2.(1b) Timbunan Biasa dari Galian M3 199,089.00 5,000.00 995,445,000.00 1.237 0.0618 0.0618 0.0618 0.0618 0.0618 0.0618 0.0618 0.0618 0.0618 0.0618 0.0618 0.0618 0.0618 0.0618 0.0618 0.0618
3.3.(1) Penyiapan Badan Jalan M2 85,870.00 2,900.00 249,023,000.00 0.309 0.0119 0.0119 0.0119 0.0119 0.0119 0.0119 0.0119 0.0119 0.0119

DIVISI 4. PEKERJAAN PREVENTIF

DIVISI 5. PERKERASAN BERBUTIR DAN BETON SEMEN


5.1.(1) Lapis Pondasi Aggregat Kelas A M3 25,986.00 395,400.00 10,274,864,400.00 12.764 0.4909 0.4909 0.4909 0.4909 0.4909 0.4909 0.4909 0.4909 0.4909
5.1.(3) Lapis Pondasi Aggregat Kelas S M3 4,549.00 364,800.00 1,659,475,200.00 2.062

DIVISI 6. PERKERASAN ASPAL


6.1.(1) Lapis Resap Pengikat - Aspal Cair/Emulsi Liter 51,398.00 9,600.00 493,420,800.00 0.613
6.1.(2a) Lapis Perekat - Aspal Cair/Emulsi Liter 18,052.00 9,100.00 164,273,200.00 0.204
6.3.(5a) Laston Lapis Aus (AC-WC) Ton 5,643.00 897,300.00 5,063,463,900.00 6.290
6.3.(6a) Laston Lapis Antara (AC-BC) Ton 8,356.00 879,400.00 7,348,266,400.00 9.129
6.3.(7a) Laston Lapis Pondasi (AC-Base) Ton 11,141.00 829,400.00 9,240,345,400.00 11.479
6.3.(8) Bahan Anti Pengelupasan Kg 4,525.00 34,400.00 155,660,000.00 0.193

DIVISI 7. STRUKTUR
7.1.(5a) Beton Struktur fc'30 Mpa M3 689.00 1,403,180.00 966,791,020.00 1.201 0.0801 0.0801 0.0801 0.0801 0.0801 0.0801
7.1.(7a) Beton Struktur fc'20 Mpa M3 1,798.00 1,263,170.00 2,271,179,660.00 2.821 0.2170 0.2170 0.2170 0.2170 0.2170 0.2170 0.2170 0.2170 0.2170
7.1.(8) Beton fc'15 Mpa M3 308.00 1,099,640.00 338,689,120.00 0.421
7.1.(9) Beton Siklop fc'15 Mpa M3 528.00 721,050.00 380,714,400.00 0.473 0.0676 0.0676 0.0676 0.0676 0.0676 0.0676 0.0676
7.1.(10) Beton fc'10 Mpa M3 18.00 826,200.00 14,871,600.00 0.018 0.0046 0.0046 0.0046 0.0046
7.2.(1c) Penyediaan Unit Pracetak Gelagar Tipe I Bentang 50 m Buah 10.00 524,330,400.00 5,243,304,000.00 6.514 1.6284
7.2.(2c) Pemasangan Unit Pracetak Gelagar Tipe I Bentang 50 m Buah 10.00 37,587,900.00 375,879,000.00 0.467
7.3.(1) Baja Tulangan Polos - BJTP 280 Kg 24,955.00 10,400.00 259,532,000.00 0.322 0.0322 0.0322 0.0322 0.0322 0.0322 0.0322 0.0322 0.0322 0.0322 0.0322
7.3.(4) Baja Tulangan Strip - BJTP 420B Kg 147,457.00 10,500.00 1,548,298,500.00 1.923 0.1069 0.1069 0.1069 0.1069 0.1069 0.1069 0.1069 0.1069 0.1069 0.1069 0.1069 0.1069 0.1069 0.1069 0.1069
7.7.(1) Dinding Sumuran Silinder Terpasang Diameter 3,5 m M1 48.00 7,899,400.00 379,171,200.00 0.471 0.0471 0.0471 0.0471 0.0471 0.0471 0.0471 0.0471 0.0471 0.0471 0.0471
7.9.(1) Pasangan Batu M3 3,893.00 697,600.00 2,715,756,800.00 3.374 0.0937 0.0937 0.0937 0.0937 0.0937 0.0937 0.0937 0.0937 0.0937 0.0937 0.0937 0.0937 0.0937 0.0937 0.0937 0.0937 0.0937
7.11.(7) Sambungan Siar Muai Tipe Karet Dengan Lebar …m M1 36.00 3,935,300.00 141,670,800.00 0.176
7.12.(2) Landasan Elastrometrik Karet Alam Berlapis Baja Ukuran…mm Buah 20.00 2,703,100.00 54,062,000.00 0.067
7.13.(1) Sandaran (Railing) M1 102.00 499,400.00 50,938,800.00 0.063
7.14.(1) Papan Nama Jembatan Buah 1.00 731,200.00 731,200.00 0.001
7.16.(1) Deck Drain Unit 24.00 701,800.00 16,843,200.00 0.021
7.16.(3a) Pipa Drainase PVC diameter 100 mm M1 50.00 75,500.00 3,775,000.00 0.005

DIVISI 8. REHABILITASI JEMBATAN

DIVISI 9. PEKERJAAN HARIAN DAN PEKERJAAN LAIN-LAIN


9.2.(1) Marka Jalan Termoplastik M2 1,936.00 91,500.00 177,144,000.00 0.220
9.2.(4a) Rambu Jalan Tunggal dengan Permukaan Pemantul Hight Intensity Grade Buah 32.00 663,700.00 21,238,400.00 0.026
9.2.(4b) Rambu Jalan Ganda dengan Permukaan Pemantul Hight Intensity Grade Buah 6.00 828,700.00 4,972,200.00 0.006
9.2.(7) Rel Pengaman M1 2,205.00 627,400.00 1,383,417,000.00 1.719
9.2.(10a) Kerb Pracetak Jenis 1 (Peninggi/Mountable) M1 100.00 118,600.00 11,860,000.00 0.015
9.2.(14) Unit Lampu Penerangan Jalan Lengan Tunggal, Tipe LED Buah 16.00 16,714,200.00 267,427,200.00 0.332
9.2.(22a) Stabilisasi Dengan Tanaman M2 87,672.00 9,900.00 867,952,800.00 1.078
9.2.(24) Pohon Jenis Angsana Buah 700.00 14,100.00 9,870,000.00 0.012

JUMLAH BOBOT (%) 80,497,284,900.00 100.000


(Progress Kemajuan Pekerjaan Mingguan) 0.097 0.097 0.097 0.097 0.009 0.009 0.632 0.763 0.993 1.035 1.252 1.320 1.719 1.719 2.222 2.110 2.110 2.194 2.047 1.830 1.830 1.826 0.009 0.009 3.459
(Progress) Kemajuan Pekerjaan Kumulatif Mingguan 0.000 0.097 0.194 0.290 0.387 0.396 0.405 1.037 1.800 2.793 3.828 5.080 6.400 8.118 9.837 12.059 14.168 16.278 18.472 20.519 22.349 24.180 26.005 26.014 26.023 29.482
NAN JALAN LINGKAR TIMUR KUNINGAN

26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53
8-Jun 15-Jun 22-Jun 29-Jun 6-Jul 13-Jul 20-Jul 27-Jul 3-Aug 10-Aug 17-Aug 24-Aug 31-Aug 7-Sep 14-Sep 21-Sep 28-Sep 5-Oct 12-Oct 19-Oct 26-Oct 2-Nov 9-Nov 16-Nov 23-Nov 30-Nov 7-Dec 14-Dec Keterangan
s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d
14-Jun 21-Jun 28-Jun 5-Jul 12-Jul 19-Jul 26-Jul 2-Aug 9-Aug 16-Aug 23-Aug 30-Aug 6-Sep 13-Sep 20-Sep 27-Sep 4-Oct 11-Oct 18-Oct 25-Oct 1-Nov 8-Nov 15-Nov 22-Nov 29-Nov 6-Dec 13-Dec 16-Dec

0.0834 0.0834 100%


0.0027 0.0027 0.0027 0.0027 0.0027 0.0027 0.0027 0.0027 0.0027 0.0027 0.0027 0.0027 0.0027 0.0027 0.0027 0.0027 0.0027 0.0027 0.0027 0.0027 0.0027 0.0027 0.0027 0.0027 0.0027 0.0027 0.0027 0.0027
0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002
0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002
0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002
0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002
0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002
0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002
0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003
0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003
0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002
0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002
0.0007 0.0007 0.0007 0.0007 0.0007 0.0007 0.0007
0.0005 0.0005 0.0005 0.0005 0.0005 0.0005 0.0005
0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003
0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003
0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003
0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004
0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003
0.0039 0.0039 0.0039 0.0039 0.0039 0.0039 0.0039 0.0039 0.0039 0.0039 0.0039 0.0039 0.0039 0.0039 0.0039 0.0039 0.0039 0.0039 0.0039 0.0039 0.0039 0.0039 0.0039 0.0039 0.0039 0.0039 0.0039 0.0039
0.0021 0.0021 0.0021 0.0021 0.0021 0.0021 0.0021 0.0021 0.0021 0.0021 0.0021 0.0021 0.0021 0.0021 0.0021 0.0021 0.0021 0.0021 0.0021 0.0021 0.0021 0.0021 0.0021 0.0021 0.0021 0.0021 0.0021 0.0021

0.0354 0.0354 0.0354 0.0354 0.0354 0.0354 0.0354 0.0354 0.0354 0.0354 0.0354 0.0354 0.0354

0.0432 0.0432 0.0432 0.0432 0.0432 0.0432


0.3990 0.3990 0.3990 0.3990 0.3990 0.3990 0.3990 0.3990 0.3990 0.3990 0.3990 0.3990 0.3990 0.3990 0.3990 0.3990 0.3990 0.3990 0.3990 0.3990 0.3990 0.3990 0.3990 0.3990 0.3990

0.4940 0.4940 0.4940 0.4940 0.4940 0.4940 0.4940 0.4940 0.4940 0.4940 0.4940 0.4940 0.4940 0.4940 0.4940

0.0618 0.0618 0.0618 0.0618


0.0119 0.0119 0.0119 0.0119 0.0119 0.0119 0.0119 0.0119 0.0119 0.0119 0.0119 0.0119 0.0119 0.0119 0.0119 0.0119 0.0119

0.4909 0.4909 0.4909 0.4909 0.4909 0.4909 0.4909 0.4909 0.4909 0.4909 0.4909 0.4909 0.4909 0.4909 0.4909 0.4909 0.4909
0.3436 0.3436 0.3436 0.3436 0.3436 0.3436

0.0341 0.0341 0.0341 0.0341 0.0341 0.0341 0.0341 0.0341 0.0341 0.0341 0.0341 0.0341 0.0341 0.0341 0.0341 0.0341 0.0341 0.0341
0.0136 0.0136 0.0136 0.0136 0.0136 0.0136 0.0136 0.0136 0.0136 0.0136 0.0136 0.0136 0.0136 0.0136 0.0136
1.2580 1.2580 1.2580 1.2580 1.2580
0.9129 0.9129 0.9129 0.9129 0.9129 0.9129 0.9129 0.9129 0.9129 0.9129
0.6377 0.6377 0.6377 0.6377 0.6377 0.6377 0.6377 0.6377 0.6377 0.6377 0.6377 0.6377 0.6377 0.6377 0.6377 0.6377 0.6377 0.6377
0.0081 0.0081 0.0081 0.0081 0.0081 0.0081 0.0081 0.0081 0.0081 0.0081 0.0081 0.0081 0.0081 0.0081 0.0081 0.0081 0.0081 0.0081 0.0081 0.0081 0.0081 0.0081 0.0081 0.0081

0.0801 0.0801 0.0801 0.0801 0.0801 0.0801 0.0801 0.0801 0.0801


0.2170 0.2170 0.2170 0.2170
0.1052 0.1052 0.1052 0.1052

1.6284 1.6284 1.6284


0.1556 0.1556 0.1556

0.1069 0.1069 0.1069

0.0937 0.0937 0.0937 0.0937 0.0937 0.0937 0.0937 0.0937 0.0937 0.0937 0.0937 0.0937 0.0937 0.0937 0.0937 0.0937 0.0937 0.0937 0.0937
0.0587 0.0587 0.0587
0.0672
0.0211 0.0211 0.0211
0.0009
0.0052 0.0052 0.0052 0.0052
0.0016 0.0016 0.0016

0.1100 0.1100
0.0088 0.0088 0.0088
0.0062
0.2148 0.2148 0.2148 0.2148 0.2148 0.2148 0.2148 0.2148
0.0147
0.1107 0.1107 0.1107
0.1348 0.1348 0.1348 0.1348 0.1348 0.1348 0.1348 0.1348
0.0020 0.0020 0.0020 0.0020 0.0020 0.0020

3.459 4.206 4.294 2.554 2.492 2.561 2.517 2.623 2.621 2.319 3.325 3.220 3.221 3.105 3.105 2.611 2.611 2.459 2.459 1.694 2.039 2.383 2.508 2.500 2.505 0.476 0.557 0.097
32.940 37.146 41.440 43.995 46.487 49.048 51.565 54.188 56.809 59.128 62.453 65.672 68.893 71.998 75.102 77.713 80.323 82.783 85.242 86.936 88.975 91.358 93.866 96.366 98.871 99.347 99.903 100.000