Kabupaten : Jenis Prasarana : Pemasangan Paving Block

Kecamatan : Take Of Sheet Lokasi :


Desa : Volume : 12 x 33 m 2

1. PEMBERSIHAN LOKASI Luas = 26 x 0 = 0 m2 Pekerja = 0.06 x 0= 0 Hok


= 0 Hok
= ( Swadaya )
2. PEKERJAAN GALIAN PONDASI Volume = x 0.15 x 0.25 = 0 mᶾ SNI BAB II-4 1Mᶾ

Pekerja = 0.4 x 0= 0 Hok


### 0 Hok

3. PEKERJAAN PENGUNCI PAVING Perhitungan Volume Pekerjaan + Acian Perhitungan Kebutuhan Volume Bahan/ Upah :
SNI 6.39 (7)
0.15 Sloof Beton , 1 PC : 2 PS : 3 Kr
Volume = 90 x 0.15 x 0.35 = 4.7 M³ Koral/Seplit = 0.78 x 4.73 = 3.69 M³

Pasir = 0.520 x 4.7 = 2.46 M³

Semen = 4.800 x 4.7 .= 22.68 Zak

0.35 Pekerja = 1.500 x 4.7 = 7.1 Hok


0.25 Hok
Tukang = 0.600 x 4.7 = 2.8 Hok

Papan Kelas I= 0.270 x 4.7 = 1.28 M³

0.15

33
4. PEKERJAAN PAVING BLOCK
Pasir = 0.121 x 396 = 47.9 M³
= 48.000 M³
Luas = 33 x 12 = 396 m2 Paving = 50.00 x 396 = 19,800 Buah
= 19,800 Buah
12 = 396 m2 Pekerja = 0.248 x 396 .= 98.2 Hok
99.0 Hok
Tukang = 0.200 x 396 = 79.2 Hok
= 80.0 Hok
33 ###
###

5.

Dibuat oleh:
###

Tanggal survei :
RENCANA ANGGARAN BIAYA PRASARANA
Propinsi : No. RAB :
Kabupaten : Program :
Kecamatan : Jenis Kegiatan :
Desa : Ukuran/dimensi : 12 x 33

PAJAK Harga UPAH Jumlah Dana (Rp)


Volume Jumlah Total
URAIAN Satuan Dasar harga+
Total PPn PPh Galian C ANGKUT PADes (Rp)
Material pajak+angkut
1. BAHAN
1.1. Pasir 50 150 2,000 M³ 10,000 110,000 122,150 6,107,500 6,107,500
1.1. Split 5 2,000 M³ 30,000 150,000 182,000 910,000 910,000
1.2. Semen 23 6,500 Sak 65,000 71,500 1,644,500 1,651,000
1.3. Paving Block 19800 200 30 Buah 2,000 2,230 44,154,000 44,154,230
1.4 Papan Bekesting 1 180,000 M³ 1,800,000 1,980,000 1,980,000 2,160,000
1.5. Air Tong 1 Tong 55,000 55,000 55,000 55,000
Sub Total 1) 54,851,000 55,037,730

2. PERALATAN -
2.1.Tali spat 1 buah 10,000 10,000 10,000
Sub Total 2) 10,000 10,000
3. UPAH -
3.1. Pekerja 107 107 Oh 80,000 8,560,000 8,560,000
3.2. Tukang 103 103 Oh 100,000 10,300,000 10,300,000
- -
Sub Total 3) 18,860,000 18,860,000
5. LAIN -LAIN - -
5.1. Papan Proyek 1 1 Bh 100,000 100,000 100,000
Sub Total 5) 100,000 100,000
APBN
Sumber Dana PADes 74,007,730
TOTAL BIAYA 74,007,730

………………….., ………………………2020

Di Setujui Oleh, Di Verifiksi Oleh Di Buat Oleh


Kepala Desa Sekretaris Desa Kasi Kesejahteraan

……………………………. …………………………………… ……………………………