PENANGANAN
LOKASI
TINGGI Replacement DASAR
NO PANJANG TIMBUNAN PANJANG GEOTEX GEOTEX PER COUNTER- PRE- KETERANGAN
TEBAL PASIR KEPUTUSAN
MAX DALAM TANAH PVD (m) DASAR 1m WEIGHT LOADING
AWAL ~ AKHIR GRANULAR
GALIAN (m) TIMBUNAN
14+809 ~ 15+000 191 8.98 1.00 WOVEN WOVEN 4.1 bln JUSTEK
REPLACEMENT DAN TIMBUNAN
5 15+000 ~ 15+125 125 8.39 1.00 9m jarak 1m 0.50 NON WOVEN WOVEN
UNTUK MERATAKAN EXISTING
5.4 bln JUSTEK
15+125 ~ 15+148 23 6.71 1.00 WOVEN WOVEN
8 15+986 ~ 16+113 127 7.80 2.00 WOVEN WOVEN 2.3 bln JUSTEK
9 16+400 ~ 16+525 125 12.31 2.50 NON WOVEN WOVEN 4.7 bln JUSTEK
13 17+233 ~ 17+350 117 8.14 2.50 NON WOVEN WOVEN per 1.2m JUSTEK
Tanggal
Anas Firmanto, ST
Project Manager
Ir. Rosihan Anwar, MT
Project Engineer
Bambang Hendrarto
Pimpinam Proyek
STRIPMAP PENANGANAN TIMBUNAN STA 12+950 ~ 16+600
SKALA : NTS
REVISI :
Jalan Tol Pekanbaru - Dumai
13 307
12 953
13 572
13 639
247.34 106.89
67.34
12+950 13+000 13+100 13+200 13+300 13+400 13+500 13+600 13+700 13+800 13+900
14 047
14 126
14 809
78.31
13+900 14+000 14+100 14+200 14+300 14+400 14+500 14+600 14+700 14+800
15 189
14 809
15 148
15 268
15 588
15 681
191.13 125.00 23.31
78.74 36.88 25.00 30.72
Granular 1m
15 681
15 986
16 113
16 400
16 525
16 629
30.72 127.14 125.32
15+700 15+800 15+900 16+000 16+100 16+200 16+300 16+400 16+500 16+600
Dasar timbunan dgn Geotex Woven
Geotex woven per 1 m + preloading
REVISI : 26 NOV 2019 UPDATE : 16 NOV 2019 ·
·
KONSULTAN SUPERVISI KONTRAKTOR DIAJUKAN OLEH, DIPERIKSA DAN DISETUJUI MENGETAHUI SHOP DRAWING NO. GAMBAR :
PEMBANGUNAN JALAN TOL
Digambar Basuki Rahmat JUDUL GAMBAR :
PEKANBARU - DUMAI
INOVASI UNTUK SOLUSI
TRANSSUMATERA SEKSI - 2
STA. 9+500 ~ STA. 33+600
egis INFRA STRUKTUR
Diperiksa R. Kresnoharijotejo
Tanggal
Anas Firmanto, ST
Project Manager
Ir. Rosihan Anwar, MT
Project Engineer
Bambang Hendrarto
Pimpinam Proyek
STRIPMAP PENANGANAN TIMBUNAN STA 16+600 ~ 20+250
SKALA : NTS
REVISI :
Jalan Tol Pekanbaru - Dumai
16 629
16 679
16 794
16 823
16 921
16 938
17 233
166.94 166.70
49.52 29.81 17.41
16+600 16+700 16+800 16+900 17+000 17+100 17+200 17+300 17+400 17+500
Sampai tanah Sampai tanah Sampai tanah
organik hilang organik hilang organik hilang
17 567
17 632
17 704
17 787
17 811
17 854
17 977
18 432
166.70
72.31 23.30 123.32
geotex per 1m
17+650
17+450 & 17+525 (RTA) 17+800 (RTA) 17+950 (RTA)
Replacement granular 100cm sesuai dcp 2%
Replacement granular 250cm Replacement Tanah hasil galian,60cm Replacement Tanah hasil galian, 60cm Replacement tanah hasil galian 50cm
Geotextile non woven pada dasar Timbunan
Geotextile non woven pada dasar Timbunan sesuai DCP min 2% sesuai dcp min 2% L=127.00m Geotextile non woven dasar Timbunan
Geotextile woven per 1 meter, 3 layer
Geotextile woven per 1 meter Geotex woven dasar Timbunan Geotex woven dasar Timbunan L=127.00m preload 3.50m, t=3bln
Counterweight
17+500 17+600 17+700 17+800 17+900 18+000 18+100 18+200 18+300 18+400
· Agar dilakukan DCP dengan kedalaman
Replacement tanah lebih dari 1m (±2.5m) Sampai tanah Sampai tanah
hasil galian 1-2m · Penggunaan Geotex agar dibackup dengan organik hilang organik hilang
justifikasi teknis konsultan
18 432
18 492
18 694
18 780
19 206
60.60 86.51 272.28
18+400 18+500 18+600 18+700 18+800 18+900 19+000 19+100 19+200 19+300
Sampai tanah · DCP ulang
organik hilang · Penggunaan Geotex 3 layer agar dibackup
dengan justifikasi teknis konsultan
20 048
20 149
19 479
19 699
19 888
272.28 189.17 100.41
geotex per 1m
(RTA) 20+100
(RTA) 19+225 ~ 19+500 (JUSTEK) 19+775 Replacement Tanah hasil galian 100cm
Replacement Tanah hasil galian 100cm Replacement Granular 250cm sesuai dcp min 2%
Geotex woven dasar Timbunan Geotex non woven dasar Timbunan Geotex woven dasar Timbunan
Preloading h=2m T:2bln, 150.00m Geotex woven per 1 meter Preloading h:3m T:3.5bln
L =76.5m
19+300 19+400 19+500 19+600 19+700 19+800 19+900 20+000 20+100 20+200 20+250