The 16th
Indonesia’s
IndoBuildTech
Largest
Jakarta 2018
Exhibition
2-6 May 2018
Indonesia Convention Exhibition of Building
(ICE) BSD City, Indonesia
Material &
www.indobuildtech.com Interior
Sustainable Urban
Development
Diterbitkan oleh
PT Debindo International Trade & Exhibitions
Daftar isi
Sustainable
Urban
Development
1.2 Venue
Indonesia Convention Exhibition (ICE)
Jl. Boulevard BSD Barat Office Park 1, BSD City, Tangerang 15339, Indonesia
Phone : +6221 2971 4600
Fax : +6221 2966 1288
Website : www.ice-indonesia.com
1.4 Organiser
PT Wanindo Prima
Jl. H. Aseni No. 88, Kalideres, West Jakarta
Jakarta 11850 - Indonesia
www.indoprima.com
Contact :
l General Information :
Ms. Margaretha Ms. Jenny
mobile : +62 813 1786 9992 mobile : +62 853 1933 7180
Email : margaretha@wanindo.com Email : jenny@wanindo.com
l Hall 5 & 6 :
Mr. Anis
Mobile : +62 817 493 7201
Email : anis_xisco@yahoo.co.id
l Hall 7 & 8 :
Mr. Sugi
Mobile : +62 812 9036 1391
Email : sugi@wanindo.com
l Hall 9 & 10 :
Mr. Mamad
Mobile : +62 898 827 6384
Email : mamad_xisco@yahoo.com
5. Atria Hotel & Residences Gading Serpong **** (8,5 km from venue)
Jl. Boulevard Raya Gading Serpong, Kav. 3, Gading Serpong,
Tangerang – 15810, Banten – Indonesia
Contact Person : Dini Stivani
Phone : +62 21 2921 5999
Fax : +62 21 2921 6999
Email : ssm1@atriahotelserpong.com
Website : www.atriahotelserpong.com /
www.atriaresidencesserpong.com
Sustainable
Urban
Development
Hall 1 - Hall 10
Minggu, 29 April 2018 07.00 – 24.00 WIB • Pembangunan stand standard oleh
Official Contractor.
• Pembangunan stand special design
oleh peserta dan kontraktor stand.
Kamis - Minggu 10.00 – 21.00 WIB • Pameran terbuka untuk bisnis dan
3 – 6 Mei 2018 umum
5 3 1-R-23 9 4 3 7 4 3 6 3
9
Room 4
IABHI
12
SEMINAR 10
1-B-8 1-C-8 1-C-8A 1-D-8 1-D-8A 1-E-8 1-E-8A 2H-9 2J-9 2K-9 2L-9B 2L-9C 3M-9B 3M-9C 2-R-31 3-R32 3-N-7C 3-N-7D 3-N-7E Indonesia 3A-Q-7B 3A-Q-7C 3A-S-7B 3A-S-7C 3A-T-7C 3A-T-7D 3A-T-7E 3A-U-7B3A-U-7C 3A-V-7B 3A-V-7C
IAI
GUNADARMA -
BULK 1-R-25 ROOM A
- ARSITEKTUR
UPH - DESIGN
UNIVERSITAS
Construction
- ARSITEKTUR
ARSITEKTUR
- LANSEKAP
UNIVERSITAS
PEMBANGUNAN
JAYA BAYA
PROTEIN
INDONESIA
15
INTERIOR
TRISAKTI
TRISAKTI
ARSITEKTUR
INTERIOR BANTEN
TARUMA
NEGARA
DESIGN
Summit
SHOP 6 6 6
JAYA -
2L-9A 2L-9 3M-9A 3M-9 2-R-32
3 1-R-26 MSA 3 3
MERCU BUANA
- ARSITEKTUR
SARANG
LABA-LABA
1-R-9 10 10 6 3.5 3.5
CARGO
3-N-7B 3-N-7A 3-N-7 15 3A-Q-7 3A-Q-7A 3A-S-7 3A-S-7A 3A-T-7 3A-T-7A 3A-T-7B 3A-U-7 3A-U-7A 3A-V-7 3A-V-7A
1-A-7B 1-A-7C 1-B-7B 1-B-7C 1-C-7B 1-C-7C 1-D-7B 1-D-7C 1-E-7B 1-E-7C 12 2-R-33 3-R31
4 3 HDII DKI
TIGER 1-R-27 AGILITY JAKARTA
7 BALM
2G-8 2H-8 2J-8 2K-8A 2K-8 3M-8 2-R-35 3-R30 3-N-6C 3-N-6D 3-N-6E 3-O-6B 3-O-6C 3-P-6B 3-P-6C 3A-Q-6B 3A-Q-6C 3A-S-6B 3A-S-6C 3A-T-6C 3A-T-6D 3A-T-6E 3A-U-6B 3A-U-6C 3A-V-6B 3A-V-6C
CONNEC
IGK INKINDO
JAKARTA - DESIGN
LASALLE COLLEGE
BUDI LUHUR
- ARSITEKTUR
- ARSITEKTUR
- ARSITEKTUR
- ARSITEKTUR
SRI
- ARSITEKTUR
SHOES
PANCASILA -
ARSITEKTUR
- ARSITEKTUR
MULTIMEDIA
PODOMORO
DWIPAYANA
PRASETYA
6 LANKA - ARSITEKTUR
TRISAKTI
INTERIOR
KRISNA
1-A-7 1-A-7A 1-B-7 1-B-7A 1-C-7 1-C-7A 1-D-7 1-D-7A 1-E-7 1-E-7A
ALUMNI
TRISAKTI
AGUNG
6 6
MULYA
CCPIT
NUS
1-R-8 1-R-28 2-R-23 6
ITI
2K-8B 2L-8 2-R-36 3-R26 INDRAPRASTA
3 3 3 3 PGRI
- ARSITEKTUR
BIM
5 6 10 3 3 7 6
VISASA
3-N-6B 3-N-6A 3-N-6 3-O-6 3-O-6A 3-P-6 3-P-6A 3A-Q-6 3A-Q-6A 3A-S-6 3A-S-6A 3A-T-6 3A-T-6A 3A-T-6B 3A-U-6 3A-U-6A 3A-V-6 3A-V-6A
INSTITUTE
1-R-29 2-R-22
1-A-6D 1-A-6E 1-B-6D 1-B-6E 1-C-6D 1-C-6E 1-D-6D 1-D-6E 1-E-6D 1-E-6E 4 3
EDII 15 ARPI PAABI
(H)
1-R-7
1-R-30 2-R-21 PAVILION 3M-7
1-A-6B 1-A-6C 1-B-6B 1-B-6C 1-C-6B 1-C-6C 1-D-6B 1-D-6C 1-E-6B 1-E-6C 2G-7B 2G-7C 2J-7A 2J-7 2K-7 2L-7A 2L-7 3M-7A 2-R-37 3-R23 3-N-5 3-O-5 3-P-5 3A-Q-5 3A-S-5 3A-T-5 3A-U-5 3A-V-5 IQSI
HANGZHOU
HEV
SINGAPORE RPX CARDIG 6 TRANS ATRI
1-R-31 PAVILION 6 6 KOMATSU INT’L BT
SAKA 6 6
10 SCTC TAMORA TRI GREAT LEXCO
2-R-20 DISTRI
BUSINDO
3-R22
9 BETON HUTAMA 9 IVCEX FKMAJ
10 VANTAGE 9 9 9
1-A-6 1-A-6A 1-B-6 1-B-6A 1-C-6 1-C-6A 1-D-6 1-D-6A 1-E-6 1-E-6A 2G-7A 2G-7 5 5 6 3.5 3.5 3 3 PERKASA 9 KARYA
CROWN
1-R-32 2-R-38 3-R21
2-R-19
3 RE
GIST IRUNA
10 6 6 6 6 9 6 6
RATI 1-R-6
4 3 3 LOGISTICS
ON 1-A-5 1-B-5 1-C-5 1-D-5 1-E-5 1-R-33 2G-6A 2G-6 2H-6 2J-6A 2J-6B 2J-6C 2K-6 2K-6C 2L-6 3M-6A 3M-6
2-R-17 2-R-18
HAVI
TANG MOBIL DUNIA
10 SINGAPORE 6
3 LOGISTICS
GARUDA 6
10 1-R-35 PAVILION 2J-6 2K-6B 2K-6A
6 DEMAG KALOG 3-R19
9 SHUA 9 ASTA 9 TEXTILE 9 TEXTILE 9 TEXTILE 3 NANJING GUANCHAO HUZHOU CARGO 2-R-39
3-N-3 3-O-3 3-P-3 3A-Q-3 3A-S-3 3A-T-3 3A-U-3 3A-V-3
HYPER SHENZHEN JIUTONG 3
INDONESIA PAVILION PAVILION PAVILION INDUSTRY AUTOMATION
SHENGTAI
SPORT
EASYWAY
INKA
INDOSTEEL
HUANAN X LOGISTICS M
PERKASA
GEAR 2G-6B 2G-6C 10 3 3
AWECO
10 3 7 4 3A-R19
1-R-36 3-R18 KEMENTERIAN EURO AIRINDO
KAMADJAJA
MOTOR
4 TSUBAKI
3 ABUPI
MITSUI
CHINA 6
DB
MOTO 6 6 STILL 6 10 6 6 6 6 9 6 6
1-R-38 SCHENKER
6 2L-5 LINDE
1-A-3 1-B-3 1-C-3 1-D-3 1-E-3 PAVILION
E NT R A NC E
6 5 5 6 7 3 3
21
9 DANS 9 VINNYL 9 9
1-R-39
KUN 2-R-40
CIKARANG
3-R15 3-N-2 3-N-2B 3-O-2 3-P-2 3A-Q-2 3A-S-2 3A-T-2 3A-U-2 3A-V-2
CHINA CHINA
MING
GUANGDONG
GUANGDONG
SPORT
SHENGTAI
EASYWAY
DRY PORT
MITSUBISHI
PAVILION 2-R-12
CHAOYU
CHAOYU
1-R-40 2-R-11 2G-3 2H-3 2J-3 2K-3 2L-3 3M-3 2-R-41 3-R12
9 9 9
FUSO
6 6
4 GROWING BHANDA JIANGSU DINAMIKA 9 9 9
3 6 15 MAL
6 SYSPEX 6 6 KAWAN LAMA SWISSLOG TRAKTOR 6 ANCIN
1-R-5 RICH 6 GHARA 6 ANDALAN
1-R-41 NUSANTARA
LOGISTICS 3-R11
2-R-10 REKSA EQUIPMENT
6 10 6 6 6 6 9 6 6
WARIOR
LOGIS 10 10 6 7 6
SPIN
EASTYIDA
2-R-7 SGL
GUANGDONG
GUANGDONG
7.5 6 6 6
6 6 7
G I ANT MAP
6 10 10 6 6
A
1-R-46 APOLO 3-R7
CHAOYU
CHAOYU
VTS 6 3A-R20
INTOP
CBFI
4 ASIA 18 18 18 18 18 18 18
UNIQUIPT 18
1-E-1A 2G-1 2H-1 2J-1 2K-1 3M-1 2-R-45 3-R6
12 1-B-1 1-C-1 1-D-1 INDONESIA
CHINA 1-R-47
2-R-6
9 THE THE 4.5 2L-1
BP BATAM
9LEARNING 9LEARNING
TAIWAN ANGKASA INTRAMEGA TOT AL 15
SPECTRUM
1-E-1 12 12 12
TEE TEE 4.5 7 PURA 12 MULIA 41 12 GLOBAL 12 PELINDO
SAHABAT LOGISTIK 3-R5
LOGISTICS 9 PELINDO II
INDONESIA CENTER
6 6 6 66 12 I 10 6 6 6 6 9 6 6
Olympia 3
N O P Q S T U V
19
Room
B C D E 6 10 10
G H J K
6 7 6
L M
3
Hall 3A
ROOM ROOM 9 ROOM ROOM ROOM ROOM ROOM
Supply Chain Digitizing Platform Road Construction & Highway Building Material & Equipment
Hall 1 In Industry 4.0 Development Hall 3A
Hall 1 - 3A
Zona Hijau Be The Future of Sport Business
4 3 10 5 3 3 3 3 3 3 3 3 10 5 10-R-17
13
5-A-5C 5-A-5D 5-A-5E
BAJA 5-B-5 5-C-5C 5-C-5D 5-C-5E 5-D-5C 5-D-5D 5-D-5E 6-E-5B 6-E-5C 6-F-5C 6-F-5D
BINTANG
6-F-5E
6-G-5 6-G-5B 6-H-5B 6-H-5C 6-J-5E 6-J-5F 6-J-5G 7-J-5H 7-J-5J 7-K-5C 7-K-5D 7-K-5E 7-L-5A 7-L-5 7-M-5C 7-M-5D 7-M-5E 7-N-5C 7-N-5D 7-N-5E 8-O-5B 8-O-5C 8-P-6D 8-P-6E 8-P-6F
8-P-6 8-Q-5C 8-Q-5D 8-Q-5E 8-S-5C 8-S-5D 8-S-5E 9-T-5C 9-T-5D 9-T-5E 9-T-6C 9-T-6D 9-T-6E
9-U-5 9-U-5A 9-V-5B 9-V-5C 9-V-6C 9-V-6D 9-V-6E 10-W-5B10-W-5C 10-X-5C 10-X-5D 10-X-5E 10-Y-5 10-Z-5C 10-Z-5D 10-Z-5E
ORIGIN EURO TEKNIK ANDALAN METAL SCC (N)
CIPTA PAN
SAN EI
ITE
TANGGUH SEJATI
SUN
ANEKA PAPERA
LAMITAK SIMED
TAMKO
POWER TOOLS
INTOP
LESTARI (N) RICH CIPTA L (D) DEKOR (N)
EASY CBFI SHENGTAI EASY EASY
CBFI
L (D) (D) PRIMA(N) LIGNEUM KULIT 6 WORLD 6
INDAH
6 6 MAMI 1 LOUVRE 6 SEMULA SHENGTAI 66 EASYWAY MAMI 1
(D)
(S) RAILING
TOILON SMS LANGGENG (S) BATU (B) JAYA) (D) 14
3 SANJAYA (A)
(A)
3 3 (N) (I) 3 3 3 3
CIBE
LIFT (S)
TRADA
TEKNIK (R) 3
(A) (A)
3 (D) 3 INDURO INT’L
3 (N)
FRAME
CAD
WAY 3 (D) 3 3 (A)
DE
PANEL
(R)
WAY 3 (D) (A) WAY EASTYIDA 3 (A) 3 ITE ITE 3
5-A-5 5-A-5A 5-A-5B 10 5-C-5 5-C-5A 5-C-5B 5-D-5 5-D-5A 5-D-5B 6-E-5 6-E-5A 6-F-5 6-F-5A 6-F-5B 6 4 6-H-5 6-H-5A 6-J-5 6-J-5A 6-J-5B 7-J-5C 7-J-5D 7-K-5 7-K-5A 7-K-5B 2 8 7-M-5 7-M-5A 7-M-5B 7-N-5 7-N-5A 7-N-5B 8-O-5 8-O-5A 8-P-6A 8-P-6B 8-P-6C 10
9 8-Q-5 8-Q-5A 8-Q-5B 8-S-5 8-S-5A 8-S-5B 9-T-5 9-T-5A 9-T-5B 9-T-6 9-T-6A 9-T-6B 5 5 9-V-5 9-V-5A 9-V-6 9-V-6A 9-V-6B 10-W-5 10-W-5A 10-X-5 10-X-5A 10-X-5B 10 10-Z-5 10-Z-5A 10-Z-5B
4 3 4 3 3 3 3 3 3 4 4 4 3 3 3 3 3 3 3 3 3 3 3 3 4 3 4
5-R-10
5-A-3A 5-A-3B 5-B-3A 5-C-3A 5-C-3B 5-D-3 6-E-3A 6-F-3B 6-F-3A 6-G-3A 6-G-3B 6-H-3A 6-J-3B 7-J-3A 7-K-3B 7-K-3A 7-L-3A 7-M-3A 7-N-3A 8-O-3 8-P-5A 8-P-5B 8-P-5 8-Q-3A 8-S-3 9-T-3D 9-T-3C 9-U-3A 9-U-3C 9-V-3E 9-V-3F 9-V-3B 10-W-3 10-X-3B 10-X-3A 10-Y-3A 10-Z-3B 10-Z-3A
ANDROMEDA
LIGHTING
ETERNITI
PT SURA
ROCA
HIMALAYA
LLUMAR INTINUSA
9 9 9 9 9 MINYE 9 9 9 9 9 9 9 9 9 FOTILE 9 9 9 9
SHENGTAI
ITE ITE
INDAH WOOD
(B)
(N)
MOULDING
(D)
9 SELAREKSA
(D)
DEROP (D)
EASTYIDA
(N) 9
EASYWAY
INDO
(S) (D)
(D) INDUSTRIES
(D) (N) (N) (I) 9-V-3C
9-V-3D
(H) (D) (D) (D)
INTOP
ITE ITE 3 10
CBFI
4
5 5 5 5 5 5 7 3 8 4.5 4.5 10 9 18 10 9 9 9 5 5 5 5 10 5 5
5-R-9 18 18 18 18
5-A-3C 5-A-3 5-B-3 5-C-3 6-E-3 6-F-3 6-G-3 6-H-3 7-J-3 7-K-3C 7-K-3 7-L-3 7-L-3B 7-M-3 7-M-3A 7-N-3 8-P-3C 8-P-3B 8-P-3 8-Q-3B 8-Q-3 9-T-3B 9-T-3A 9-T-3 9-U-3 9-U-3B 9-V-3A 9-V-3 10-X-3 10-Y-3 10-Z-3
MOBO WINN
GAMPANGI
STAR SUPER
CBFI
SUMBER MONIER
PENTENS SIKA ROXY TOKO
IDKU ROCA ROCA
10
9 DJAJA 9 COMPOSITE 9 BELGIUM 9 9 9 MASGO TRILLIUN INOVAR
9 GLASS HIDUP9 MAS
9 (A)
TEKNIK
9 ITE 9
YOSHINO
9
GNET DELICA 9 9 9 GAS 9 LITE POINT 9 ITE 9 ITE 9 RIFENG 9 9
10-R-19
(N)
(N) (N)
(D)
TEGOLA 9 9
(B)
PERKASA
(R) (N) 9
(H) (A) (N)
(D)
BARU (A) (B) (D) (D) (D) (S) (A) (A) (D) (D) (D)
(D) (S)
8-P-3A
KLASSEN (A)
5 10 5 10 10 6 6 10
10
10 10
10 88 6 6 4.5 4.5 6 10 4 5 4 6 6 4.5 9 4.5 5 5 4.5 9 6 3 9 6 99 5 5 6 66 6 10 10 10 TION
STRA
5-R-8 15
3 REGI 10
MAKMUR (N)
5-A-2A 5-B-2A 5-C-2A 5-D-2 6-E-2 6-F-2A 6-G-2A 6-H-2 6-J-2A 7-J-2 7-M-2A 8-P-2C 9-T-2A 9-U-2 9-V-2A 9-V-2 10-W-2 10-X-2A 10-Y-2 10-Z-2
10
CT-i REYNAERS EZTU
AMERICAN CSA
SINGAPORE
& RE-HOLZ 9 9 9
EASYWAY
STANDARD 9
SHENGTAI
(N)
PAVILION
PAVILION
TAIWAN
(N) (N)
INTOP
(D) 4
CBFI
ITALY
SUNRISE ONNA
CBFI
5-R-7
18 18 18 18 18 18 18 18 18
HAFELE 18 18 18 18
DBC 18
ROCA
18 STEEL 7-K-2 7-L-2 7-M-2 (D)
E NT R A NC E
5-A-2 5-B-2 5-C-2 6-F-2 6-G-2 8-P-2B 8-P-2 8-Q-2 9-T-2 INDONESIA 10-X-2 CORPORATE (D)
G AT E 1 0
10
UBINKAYU
G AT E H A L L 1 0
(S) GAJAH MADA
YUKI (A)
G I ANT MAP
10
EASTYIDA
KANGBANG
XINGFA (S)
PAVILION
KOREA
EKA
INTOP
TURKEY
5-R-5 INDALEX
CBFI
MM
MITRA10
CSG
TATA TATA CIPTA RIGEL BIOWOOD DEKKSON BOARD KENARI VIVERE USG BORAL TOTO SURYA VALENTINO GRANITY GALERY PLATINUM AMERICAN QUADRA
(N)
15 23
(A) 18 LOGAM LOGAM 18PAPAN (N) (A) (D) 18 DJAJA GROUP JAYA BOARD PERTIWI 18 GRESS (D) (A) (D) STANDARD (D)
18 18 18
KINLONG
18 18 18 18 18 18 18 18 18 18 (D) 18
(D)
18 18
(D) (N)
18 18 18
18
(D)
18
PLAFON (A)
18 18
(D) (D) (N) (D) (N) (D) 18
SHUNDA
(D)
10 10 10 6
6 6
6 10
10 10 8 6
6 6 9 10 9 6 6 9 10 9 6 9 9 10 6 6 6 10 10 10
A B C D E F G H J K L M N O P Q S T U W X Y Z
15
4
V 4
5-R-3 5-R-2 5-R-1 6-R-5 6-R-2 6-R-1 7-R-3 7-R-2 7-R-1 8-R-3 8-R-2 8-R-1 9-R-3 9-R-2 9-R-1 10-R-2 10-R-1
CAHAYA SOLID AMERICAN
M POIN PENGUIN FENSTELA BLUE SCOPE MILAN ALUPLUS DLLUXOR RNI
9 9 9 9 BENTENG 9 9 GRADINO 9 9
FAGETTI (N) 9 9 ELEGANZA FAGETTI
(N) 9 9 STANDARD
(D)
3
(N) (N) MAS (A) (D) ECOWOOD (N) (A) (N) (N) (D)
(D) (B)
14 14 12 14 14 12 14 14 12 14 14 12 14 15 12 15 16
ORGANISER ORGANISER CONTRACTOR ORGANISER ORGANISER CONTRACTOR ORGANISER CONTRACTOR ORGANISER VIP
ROOM ROOM ROOM ROOM ROOM ROOM ROOM ROOM ROOM ROOM
IN NT
MA
P
OUT
GIA
ON
STAGE REGISTRATI STAGE
Hall 5 - 10
Zona Hijau
Minggu, 29 April 2018, Jam 07.00 - 09.00
Zona Kuning
Minggu, 29 April 2018, Jam 09.00 - 11.00
Zona Biru
Minggu, 29 April 2018 Jam 11.00
Fasilitas :
1. Karpet abu-abu tua 5. Kursi lipat = 2 unit
2. Partisi Maxima tinggi : 2.5m 6. Tempat sampah = 1unit
3. Fascia name 7. Lampu TL = 2unit
4. Meja counter ukuran : 100x50x75cm = 1 unit 8. Stop kontak + MCB 2amp (9m2 )
b. Special Design
Penyelenggara hanya menyediakan lahan dan aliran listrik beserta MCB berdasar
besaran area yang disewa peserta pameran. Peserta diwajibkan untuk menutup lantai
dengan menggunakan material seperti flooring, carpet dll. Dinding stand (samping
dan belakang) diwajibkan tidak lebih rendah dari 2,5 M dan tidak lebih tinggi dari 8M.
Apabila tinggi dinding stand salah satu peserta melebihi dinding stand perserta lain
yang berdampingan maka peserta tesebut diwajibkan untuk melapisi atau menutupi
sisi belakang atau samping (finishing dinding stand) tersebut.
Penyelenggara berhak untuk mengubah sewaktu waktu rancangan design apabila design
rancangan stand tidak memenuhi persyaratan/peraturan.
Pada saat pameran berlangsung atau pada tanggal 2 Mei 2018 - 6 Mei 2018, apabila
peserta ingin memasukan barang - barang tambahan yang berkaitan dengan pelaksanaan
pameran, maka peserta diwajinkan untuk mengisi kembali formulir keluar masuk barang.
Para peserta dan kontraktor bertanggung jawab penuh atas material stand dan barang
yang ada didalam stand pameran masing-masing selama proses loading/unloading.
Pada saat unloading peserta wajib untuk menunjukan kepada petugas keamanan
formulir keluar masuk barang yang telah di tanda tangani oleh penyelenggara.
Sustainable
Urban
Development
/sqm
/sqm
/sqm
d. Penyambungan listrik dari panel listrik hall ke stop kontak / MCB dilaksanakan oleh
official contractor dan instalasi listrik di dalam stand dilaksanakan oleh masingmasing
peserta dan atau kontraktor stand yang ditunjuk oleh peserta.
e. Untuk menghindari hal-hal yang tidak diinginkan (korsleting atau terbakar) dalam
instalasi listrik maka:
• Peserta pameran diharuskan menggunakan kabel listrik yang kuat (NYM).
• Dilarang menginstalasi daya listrik melebihi dari kapasitas MCB yang terpasang.
• Jika menjadi kelalaian didalam stand maka menjadi tanggung jawab peserta
pameran.
Sustainable
Urban
Development
47 10
100-125 50
126 60
Bagi peserta yang akan menambah working pass harap menghubungi contact
person diatas.
F. Working pass wajib dikenakan oleh setiap pekerja kontraktor selama masa
pembangunan berlangsung.
Sustainable
Urban
Development
Sustainable
Urban
Development
d. Apabila suara yang keluar melebihi batas yang telah di tentukan maka
penyelenggara berhak untuk menurunkan atau mematikan alat pengeras suara
yang dipergunakan.
e. Apabila suara yang keluar melebihi batas yang ditentukan maka peserta diwajibkan
untuk mengisi Noise Level Incompliance Form (lihat halaman Lampiran). Jika
pelanggaran telah dilakukan lebih dari 3 (tiga) kali penyelenggara berhak menahan
sementara sampai dengan pameran selesai alat pengeras suara yang digunakan.
Sustainable
Urban
Development
Untuk memudahkan proses penerimaan username & password, dihimbau untuk para
penanggung jawab dari tiap-tiap perusahaan yang telah teregistrasi agar
menambahkan noreply@indobuildtech-adm.co.id didalam address book e-mail PIC
yang terkait. Kemudian, peserta pameran akan menerima e-mail yang berisi
username dan password sementara yang dapat digunakan untuk masuk kedalam
akun masing-masing perusahaan untuk perubahan username dan password sesuai
dengan yang diinginkan.
Untuk dapat mengakses sistem lebih lanjut, anda akan diminta untuk mengisi
username dan password baru untuk menjaga keamanan dari akun yang anda miliki.
Setelah melakukan proses reset silahkan melakukan login kembali dengan
username dan password yang baru.
• Standard Booth
Pilihan opsi Special Design akan secara otomatis terpilih apabila perusahaan
anda telah memutuskan untuk menggunakan Special Design. Untuk opsi Special
Design, anda cukup memasukan data dari kontraktor terpilih (apabila anda
menggunakan vendor dalam proses design dan pembangunan booth anda) atau nama
perusahaan anda (apabila anda berencana untuk menggunakan sumber daya yang
dimiliki oleh perusahaan anda sendiri).
Setelah data-data tersebut selesai diinput, anda juga dapat melampirkan file
desain booth dan juga memberikan deskripsi dari desain both tersebut
dan pilih opsi save untuk menyelesaikan proses input data.
Proses pemesanan paket sponsorship dibagi menjadi dua cara sebagai berikut:
• Nomor 1
Untuk dapat memesan opsi yang tersedia di dalam kotak nomor 1, dapat
dilakukan dengan memberikan memilih ceklist dari pilihan yang tersedia.
• Nomor 2
Untuk dapat memesan opsi yang tersedia didalam kotak nomor 2, dapat
dilakukan dengan mengetik jumlah paket yang ingin anda pesan.
Keterangan :
1. Tanggal Invoice
Tanggal pengeluaran invoice oleh pelaksana pameran
2. Due Date
Tanggal jatuh tempo pembayaran invoice
3. Jumlah Tagihan
Jumlah tagihan yang tertera didalam invoice yang harus dibayarkan
4. Status Pembayaran
Status pelunasan dari invoice yang telah ditagihkan kepada peserta pameran.
5. Upload Bukti Pembayaran dan Bukti Potong Pajak
Peserta dapat melampirkan foto atau file bukti pembayaran dan bukti potong
pajak (besaran data max. 2 Megabyte)
Sustainable
Urban
Development
Sustainable
Urban
Development
CONTACT PERSON
1. Penanggung Jawab Hall
• Hall 1 : Sakanti Sasri
Mobile : +62 856 9177 1783
Email : sakanti.debindo@gmail.com
• Hall 2 : Harwin Hartanto
Mobile : +62 838 9601 8328
Email : harwinhartanto.debindo@gmail.com
• Hall 3 : Syeren Felisia
Mobile : +62 812 8630 7089
Email : syerenfelisia@gmail.com
• Hall 3A : Bintang Mia
Mobile : +62 812 949 1758
Email : bintang@debindo-ite.com
• Hall 5 : Alfin Irzal
Mobile : +62 818 1922 70
Email : alfin_irsal@yahoo.com
• Hall 6 : Ridwan Zulkarnaen
Mobile : +62 877 7015 5886
Email : ridwandebindo@gmail.com.com
• Hall 7 : Rainyke Astrid
Mobile : +62 812 8720 3937
Email : ike@debindo-ite.com
• Hall 8 : Surya Agung Wicaksono
Mobile : +62 878 21311 567
Email : suryadebindo@gmail.com
• Hall 9 : Didik Susanto
Mobile : +62 813 11050 189
Email : didikdeb@yahoo.com
• Hall 10 : Dodi Wisnu Prabowo
Mobile : +62 857 9434 6016
Email : rdodiwisnuprabowo@gmail.com
Email : rdodiwisnuprabowo@gmail.com
Email : kemas.debindo@gmail.com
Email : dimassaputra2720@gmail.com
• Muthia Zulfa Amanda
Email : muthia.debindo@gmail.com
4. Business Programme
• Dyniah Martak
Email : nia@debindo-ite.com
Email : afila@debindo-ite.co.id
Email : suryadebindo@gmail.com
6. Sponsorship
Email : suryadebindo@gmail.com
LAMPIRAN
Sustainable
Urban
Development
Y
ELECTRONIC
2 - 6 May 2018
Indonesia Convention Exhibition, ICE - BSD City, Indonesia
Deadline of submissions
2 April 2018
*Submissions after 2 April 2018
will be penalized by IDR 2,000,000,-
W
NOISE INCOMPLIANCE FORM
2 - 6 May 2018
Indonesia Convention Exhibition, ICE - BSD City, Indonesia
Working Pass
2 - 6 MAY 2018
ICE - BSD CITY
HALL 1
HALL 2
HALL 3
HALL 9
www.indobuildtech.com
Contact Person
• Didik, +62 81311050189, didik@debindo-ite.com
• Alfin, +62 818192270, alfin@debindo-ite.com
• Nia, +62 8159412337, nia@debindo-ite.com
• Surya, +62 87821311567, surya@debindo-ite.com
• Ridwan, +62 87770155886, ridwan@debindo-ite.com
61 • Bintang, +62
PETUNJUK TEKNIS INDOBUILDTECH 2018 812 949 1758, bintang@debindo-ite.com