NO URAIAN VOLUME
a b c
I BLOK I
A PEKERJAAN BAJA
1.1 PEKERJAAN STRUKTUR, BALOK & ATAP
A Pekerjaan Baja
Tiang lt I IWF 300.150.6.9 1,321.20
Glagar lt I IWF 250.125.6.9 3,456.00
Anak BaloIWF 200.100.5,5.8 768.00
B PEKERJAAN SIPIL
A pek. Besi cakar ayam file cape
uk. 40.40.80 Besi Dim 12" 14.00
B Kolom
uk. 40.20.12" 45.00
uk. 20.20.12" 33.00
uk.30.20.10" 42.00
uk 10.10.10" 42.00
C Pasangan Bata Ringan + Plester Aci
Pek Hebel 7.5x20x60 626.00
Plester + Aci 1,252.00
Cat + Plamir 1,252.00
D Cor Lantai T. 10 198.00
E Pasangan Keramik
Pasang Keramik Dinding 198.00
Pasang Keramik Lantai 40x40 396.00
C PEKERJAAN PLAPON
A Pasang Plapon Gipsum 396.00
B Cat Plapon 396.00
E PEKERJAAN SANITARY
A Closed Duduk Standar AA 22.00
B Jet Shower 22.00
C Pipa Air Bersih 67.00
D Pipa Air Kotor 67.00
Total Blok I
II BLOK II
A PEKERJAAN BAJA
1.1 PEKERJAAN STRUKTUR, BALOK & ATAP
A Pekerjaan Baja
Tiang lt I IWF 300.150.6.9 1,321.20
Glagar lt I IWF 250.125.6.9 3,456.00
Anak BaloIWF 200.100.5,5.8 768.00
B PEKERJAAN SIPIL
A pek. Besi cakar ayam file cape
uk. 40.40.80 Besi Dim 12" 14.00
Kolom
B Pasangan Bata Ringan + Plester Aci
Pek Hebel 7.5x20x60 469.50
Plester + Aci 136.00
Cat + Plamir 272.00
C Cor Lantai T. 10 210.00
D Pasangan Keramik
Pasang Keramik Dinding 189.00
Pasang Keramik Lantai 40x40 420.00
C PEKERJAAN PLAPON
A Pasang Plapon Gipsum 420.00
B Cat Plapon 420.00
E PEKERJAAN SANITARY
A Closed Duduk Standar AA 20.00
B Jet Shower 20.00
C Pipa Air Bersih 67.00
D Pipa Air Kotor 67.00
Total Blok I
B PEKERJAAN SIPIL
A pek. Besi cakar ayam file cape
uk. 40.40.80 Besi Dim 12" 12.00
B Kolom
uk. 40.20.12" 33.00
uk. 20.20.12" 26.00
uk.30.20.10" 42.00
uk 10.10.10" 42.00
C Pasangan Bata Ringan + Plester Aci
Pek Hebel 7.5x20x60 298.00
Plester + Aci 596.00
Cat + Plamir 596.00
D Cor Lantai T. 10 288.00
E Pasangan Keramik
Pasang Keramik Dinding 144.00
Pasang Keramik Lantai 40x40 288.00
C PEKERJAAN PLAPON
A Pasang Plapon Gipsum 288.00
B Cat Plapon 288.00
E PEKERJAAN SANITARY
A Closed Duduk Standar AA 16.00
B Jet Shower 16.00
C Pipa Air Bersih 67.00
D Pipa Air Kotor 67.00
Total Blok I
IV BLOK IV
A PEKERJAAN BAJA
1.1 PEKERJAAN STRUKTUR, BALOK & ATAP
A Pekerjaan Baja
Tiang lt I IWF 300.150.6.9 1,101.00
Glagar lt I IWF 250.125.6.9 2,880.00
Anak BaloIWF 200.100.5,5.8 640.00
B PEKERJAAN SIPIL
A pek. Besi cakar ayam file cape
uk. 40.40.80 Besi Dim 12" 12.00
B Kolom
uk. 40.20.12" 33.00
uk. 20.20.12" 26.00
uk.30.20.10" 42.00
uk 10.10.10" 42.00
C Pasangan Bata Ringan + Plester Aci
Pek Hebel 7.5x20x60 298.00
Plester + Aci 596.00
Cat + Plamir 596.00
D Cor Lantai T. 10 288.00
E Pasangan Keramik
Pasang Keramik Dinding 144.00
Pasang Keramik Lantai 40x40 288.00
C PEKERJAAN PLAPON
A Pasang Plapon Gipsum 288.00
B Cat Plapon 288.00
E PEKERJAAN SANITARY
A Closed Duduk Standar AA 16.00
B Jet Shower 16.00
C Pipa Air Bersih 67.00
D Pipa Air Kotor 67.00
Total Blok I
V RUKO
A PEKERJAAN BAJA
1.1 PEKERJAAN STRUKTUR, BALOK & ATAP
A Pekerjaan Baja
Tiang lt I IWF 300.150.6.9 1,321.20
Glagar lt I IWF 250.125.6.9 1,920.00
Anak BaloIWF 200.100.5,5.8 640.00
B PEKERJAAN SIPIL
A pek. Besi cakar ayam file cape
uk. 40.40.80 Besi Dim 12" 10.00
B Kolom
uk. 40.20.12" 33.00
uk. 20.20.12" 26.00
uk.30.20.10" 42.00
uk 10.10.10" 42.00
C Pasangan Bata Ringan + Plester Aci
Pek Hebel 7.5x20x60 420.00
Plester + Aci 840.00
Cat + Plamir 840.00
D Cor Lantai T. 10 120.00
E Pasangan Keramik
Pasang Keramik Dinding 52.50
Pasang Keramik Lantai 40x40 120.00
C PEKERJAAN PLAPON
A Pasang Plapon Gipsum 288.00
B Cat Plapon 288.00
E PEKERJAAN SANITARY
A Closed Duduk Standar AA 5.00
B Jet Shower 5.00
C Pipa Air Bersih 47.00
D Pipa Air Kotor 47.00
Total Blok I
V INFRASTRUKTUR
A PEKERJAAN SALURAN AIR HUJAN
1.1 PEKERJAAN GALIAN & BUIS BETON
A Pekerjaan Galian
Galian Tanah 80x100 26.00
Buis Beton Dim 12" 30.00
Pasangan batu Kali 12.00
Tutup Beton 30.00
B Pekerjaan Paving Blok 663.00
C Pintu Besi 12.00
D Pos Satpam 1.00
Total Blok I
GRAND TOTAL
SAT. HARGA SATUAN JUMLAH HARGA
[Rp.] [Rp.]
d e f=cxe
kg
kg
kg
kg
kg
kg
m2
m²
m'
ttk
m'
m'
m'
m'
m2
m2
m2
m2
m2
m2
m2
m2
bh
bh
bh
bh
m'
m'
kg
kg
kg
kg
kg
kg
m2
m²
m'
ttk
m2
m2
m2
m2
m2
m2
m2
m2
bh
bh
bh
bh
m'
m'
kg
kg
kg
kg
kg
kg
m2
m²
m'
ttk
m'
m'
m'
m'
m2
m2
m2
m2
m2
m2
m2
m2
bh
bh
bh
bh
m'
m'
kg
kg
kg
kg
kg
kg
m2
m²
m'
ttk
m'
m'
m'
m'
m2
m2
m2
m2
m2
m2
m2
m2
bh
bh
bh
bh
m'
m'
kg
kg
kg
kg
kg
kg
m2
m²
m'
ttk
m'
m'
m'
m'
m2
m2
m2
m2
m2
m2
m2
m2
bh
bh
set
bh
bh
m'
m'
m'
m'
M3
m'
m2
m
Unit