201121-INFR - II-MDLK-Progress Bulanan - November 2020 (Nov. 2020)
201121-INFR - II-MDLK-Progress Bulanan - November 2020 (Nov. 2020)
PERFORMANCE IMPLEMENTASI BI M
PERIODE : NOVEMBER 2020
R E S U M E( Sesuai
P R OBobot
G R EItem
S dalam Milestone)
#REF!
6% 3. MATERIAL/ QUANTITY TAKE OFF : 0.00% 0.00% 0.00%
Total Progress 4. INTEGRASI DATA & INFORMASI : 0.00% 0.00% 0.00%
Sisa Progress 5. SHOP DRAWING 0.00% 0.00% 0.00%
6. 4D SEQUENCE (SCHEDULING) : 0.00% 0.00% 0.00%
94% 0.00% 0.00% 0.00%
7. PUBLIKASI :
8. AS BUILT MODEL : 0.00% 0.00% 0.00%
TOTAL PROGRESS 0.00% 6.00% 6.00%
Import Data Eksisting dari Hasil Photogrammetry Hasil Surface data dari Photogrammetry
Permodelan Struktur Jembatan Sta. 7+850 Kontrol Kebutuhan Material Beton Untuk Bor Pile
PT. ADHI KARYA (Persero) Tbk
Departemen Infrastruktur II
Biro Engineering dan BIM (Building Information Modeling)
East Building, Lt.2
Jl. Pasar Minggu KM. 18
PERFORMANCE IMPLEMENTASI B I M
PERIODE : NOVEMBER 2020
Progres Per-Item
No Uraian Pekerjaan Bobot Periode lalu Periode Saat ini Periode S.d saat
ini
B. Geometri Rencana
1 Aligment Horizontal 2.00% 0% 25% 25%
2 Aligment Vertikal 2.00% 0% 25% 25%
3 Tipikal/Assembly 2.00% 0% 25% 25%
g SKh Interim
1 Shot Crete 0.45% 0% 0% 0%