SIARAN KHAS
Special Release 1
SABAH DAN SARAWAK
SABAH AND SARAWAK

(UNTUK KERJA-KERJA KEJURUTERAAN AWAM)


(For Civil Engineering Works)

DISEMBER 2010
DECEMBER 2010

JABATAN PERANGKAAN MALAYSIA


DEPARTMENT OF STATISTICS, MALAYSIA

Tarikh: 17 Januari 2011


Date: 17th January 2011
KANDUNGAN
CONTENTS

MUKA SURAT
PAGE

NOTA TEKNIKAL 3
TECHNICAL NOTES

JADUAL 1 : HARGA UNIT PURATA BAGI KELULI DAN SIMEN 7


TABLE 1 : AVERAGE UNIT PRICES FOR STEEL AND CEMENT

JADUAL 2 : HARGA UNIT PURATA BAGI : 12


TABLE 2 : AVERAGE UNIT PRICES FOR :
-PASIR / SAND
-BATU BAUR/ AGGREGATES
-PREMIX
-FABRIC REINFORCEMENT
-GUARDRAIL

JADUAL 3 : HARGA UNIT PURATA BAGI BITUMEN, MINYAK BAHAN API DAN DIESEL 38
TABLE 3 : AVERAGE UNIT PRICES FOR BITUMEN, FUEL OIL AND DIESEL

LAMPIRAN A KOD KAWASAN 43


APPENDIX A REGION CODE

i
NOTA TEKNIKAL
TECHNICAL NOTES
NOTA TEKNIKAL HARGA UNIT PURATA BAGI BAR KELULI, SIMEN, BITUMEN,
MINYAK BAHAN API, DIESEL, PASIR, BATU BAUR, PREMIX,
FABRIC REINFORCEMENT DAN GUARDRAIL

Harga bagi minyak diesel adalah harga kawalan kerajaan yang ditentukan oleh
Kementerian Perdagangan Dalam Negeri, Koperasi dan Kepenggunaan.

Harga bar keluli dan simen yang diterbitkan dalam Siaran Khas 1 ini diperoleh dari
Lembaga Pembangunan Industri Pembinaan Malaysia (CIDB).

Harga yang dilaporkan mengikut 3 kawasan di Sabah dan 3 kawasan di Sarawak


seperti berikut :-

Sabah = Kota Kinabalu, Sandakan dan Tawau

Sarawak = Kuching, Sibu dan Miri

Harga bitumen dan minyak bahan api diterbitkan mulai Jun 2008. Harga ini diperoleh
dari Shell Malaysia. Harga bitumen penembusan 80/100 adalah berdasarkan harga purata
ex-Sepangar Bay bagi Sabah dan ex-Kuching bagi Sarawak.

Mulai Ogos 2008, harga pasir dan batu baur diterbitkan dalam Siaran Khas 1 ini.

Mulai September 2008, harga Premix Asphaltic Concrete, Premix Bituminous


Macadam dan fabric reinforcement diterbitkan dalam Siaran Khas 1 ini. Harga bagi fabric
reinforcement diperoleh dari CIDB. Harga fabric reinforcement mulai Disember 2007 sehingga
Disember 2009 adalah termasuk kos pemotongan. Mulai Januari 2010, harga yang diterbitkan
tidak termasuk kos pemotongan.

Mulai Oktober 2008, harga guardrail diterbitkan dalam Siaran Khas 1 ini. Harga
sehingga Disember 2009 diperoleh dari CIDB. Mulai Januari 2010, harga guardrail diperoleh
dari pungutan harga yang dibuat oleh Jabatan Perangkaan Malaysia. Harga yang diterbitkan
adalah harga di kilang termasuk kos pengangkutan.

Semua harga yang tersebut di atas adalah bagi tujuan pengiraan kadar perubahan
harga sahaja dan tidak boleh digunakan untuk mewakili kedudukan harga yang sebenar.

-3-
TECHNICAL NOTES ON THE AVERAGE UNIT PRICES FOR STEEL, CEMENT,
BITUMEN, FUEL OIL, DIESEL, SAND, AGGREGATES, PREMIX,
FABRIC REINFORCEMENT AND GUARDRAIL

The price for diesel is government controlled price as established by the Ministry of
Domestic Trade, Co-operatives and Consumerism.

The prices for steel bars and cement published in this Special Release 1 are obtained
from Construction Industry Development Board Malaysia (CIDB).

Prices are reported according to 3 regions in Sabah and 3 regions in Sarawak as


follows:-

Sabah = Kota Kinabalu, Sandakan and Tawau

Sarawak = Kuching, Sibu and Miri

The prices for bitumen and fuel oil are published since June 2008. The prices are
obtained from Shell Malaysia. The bitumen 80/100 penetration is based on the average ex-
Sepangar Bay for Sabah and ex-Kuching for Sarawak.

Starting from August 2008, the prices for sand and aggregates are published in this
Special Release 1.

Starting from September 2008, the prices for Premix Asphaltic Concrete, Premix
Bituminous Macadam and fabric reinforcement are published in this Special Release 1. The
prices for fabric reinforcement are obtained from CIDB. The fabric reinforcement prices since
December 2007 to December 2009 were inclusive of cutting services fee. Starting from
January 2010, the prices published do not include cutting services fee.

As from October 2008, the prices for guardrail are published in this Special Release 1.
The prices until December 2009 were obtained from CIDB. Starting from January 2010, the
guardrail prices are obtained from the price collection conducted by Department of Statistics,
Malaysia. The prices published are ex-factory prices inclusive of transportation charges.

All prices mentioned above are relevant for escalation purposes only and should not be
used to represent actual price levels.

-4-
JADUAL - JADUAL
TABLES
Jadual 1 - Harga Unit Purata Bagi Bar Keluli dan Simen
Table 1 - Average Unit Prices for Steel Bars and Cement
Kawasan*
Region
Sabah Sarawak
Perkara Tempoh Sabah Sarawak
Item Period
G H I J K L

(1) Bar Bulat Keluli Lembut BS-4449 RM Per Tan Metrik


Mild Steel Round Bars BS-4449 RM Per Metric Ton

10mm (3/8") 2009 DIS 2343.33 2300.00 2330.00 2193.33 2285.00 2293.33
2010 JAN 2460.00 2530.00 2550.00 2400.00 2450.00 2500.00
FEB 2460.00 2536.67 2550.00 2416.67 2466.67 2500.00
MAC 2510.00 2593.33 2600.00 2466.67 2523.33 2546.67
APR 2560.00 2643.33 2650.00 2516.67 2566.67 2600.00
MEI 2650.00 2700.00 2750.00 2616.67 2650.00 2700.00
JUN 2600.00 2600.00 2650.00 2600.00 2650.00 2700.00
JUL 2550.00 2550.00 2600.00 2550.00 2600.00 2650.00
OGO 2500.00 2550.00 2600.00 2550.00 2600.00 2650.00
SEP 2500.00 2550.00 2600.00 2550.00 2600.00 2650.00
OKT 2450.00 2500.00 2550.00 2500.00 2550.00 2600.00
NOV 2450.00 2450.00 2500.00 2500.00 2550.00 2600.00
DIS 2500.00 2500.00 2550.00 2500.00 2550.00 2600.00

12mm (1/2") 2009 DIS 2200.00 2250.00 2280.00 2166.67 2285.00 2280.00
2010 JAN 2410.00 2480.00 2500.00 2350.00 2400.00 2450.00
FEB 2410.00 2486.67 2500.00 2366.67 2416.67 2450.00
MAC 2460.00 2536.67 2550.00 2416.67 2473.33 2496.67
APR 2510.00 2586.67 2600.00 2466.67 2516.67 2550.00
MEI 2600.00 2626.67 2700.00 2566.67 2600.00 2650.00
JUN 2550.00 2550.00 2600.00 2550.00 2600.00 2650.00
JUL 2500.00 2500.00 2550.00 2500.00 2550.00 2600.00
OGO 2450.00 2500.00 2550.00 2500.00 2550.00 2600.00
SEP 2450.00 2500.00 2550.00 2500.00 2550.00 2600.00
OKT 2400.00 2450.00 2500.00 2450.00 2500.00 2550.00
NOV 2400.00 2400.00 2450.00 2450.00 2500.00 2550.00
DIS 2450.00 2450.00 2500.00 2450.00 2500.00 2550.00

* Lihat lampiran A / See appendix A

-7-
Jadual 1 (Samb.) - Harga Unit Purata Bagi Bar Keluli dan Simen
Table 1 (Cont'd.) - Average Unit Prices for Steel Bars and Cement
Kawasan*
Region
Sabah Sarawak
Perkara Tempoh Sabah Sarawak
Item Period
G H I J K L
(1) Bar Bulat Keluli Lembut BS-4449 (Samb.) RM Per Tan Metrik
Mild Steel Round Bars BS-4449 (Cont'd.) RM Per Metric Ton

16mm (5/8") 2009 DIS 2100.00 2180.00 2220.00 2196.67 2185.00 2200.00
2010 JAN 2260.00 2330.00 2350.00 2450.00 2500.00 2550.00
FEB 2260.00 2336.67 2350.00 2466.67 2516.67 2550.00
MAC 2310.00 2380.00 2400.00 2516.67 2573.33 2596.67
APR 2360.00 2430.00 2450.00 2566.67 2616.67 2650.00
MEI 2450.00 2510.00 2550.00 2666.67 2700.00 2740.00
JUN 2400.00 2450.00 2500.00 2500.00 2550.00 2600.00
JUL 2350.00 2400.00 2450.00 2450.00 2500.00 2550.00
OGO 2300.00 2400.00 2450.00 2450.00 2500.00 2550.00
SEP 2300.00 2400.00 2450.00 2450.00 2500.00 2550.00
OKT 2250.00 2350.00 2400.00 2400.00 2450.00 2500.00
NOV 2250.00 2300.00 2350.00 2400.00 2450.00 2500.00
DIS 2300.00 2350.00 2400.00 2400.00 2450.00 2500.00

20mm - 25mm 2009 DIS 2100.00 2180.00 2220.00 2206.67 2185.00 2200.00
(3/4" - 1") 2010 JAN 2260.00 2330.00 2350.00 2475.00 2525.00 2575.00
FEB 2260.00 2336.67 2350.00 2491.67 2541.67 2575.00
MAC 2310.00 2380.00 2400.00 2541.67 2598.33 2621.67
APR 2360.00 2430.00 2450.00 2591.67 2633.34 2650.00
MEI 2450.00 2500.00 2550.00 2691.67 2725.00 2740.00
JUN 2400.00 2450.00 2500.00 2500.00 2550.00 2600.00
JUL 2350.00 2400.00 2450.00 2450.00 2500.00 2550.00
OGO 2300.00 2400.00 2450.00 2450.00 2500.00 2550.00
SEP 2300.00 2400.00 2450.00 2450.00 2500.00 2550.00
OKT 2250.00 2350.00 2400.00 2400.00 2450.00 2500.00
NOV 2250.00 2300.00 2350.00 2400.00 2450.00 2500.00
DIS 2300.00 2350.00 2400.00 2400.00 2450.00 2500.00

* Lihat lampiran A / See appendix A

-8-
Jadual 1 (Samb.) - Harga Unit Purata Bagi Bar Keluli dan Simen
Table 1 (Cont'd.) - Average Unit Prices for Steel Bars and Cement
Kawasan*
Region
Sabah Sarawak
Perkara Tempoh Sabah Sarawak
Item Period
G H I J K L
(2) Mycon 60 RM Per Tan Metrik
High Tensile Deformed Bars RM Per Metric Ton

10mm (3/8") 2009 DIS 2200.00 2300.00 2400.00 2280.00 2275.00 2278.33
2010 JAN 2410.00 2480.00 2500.00 2386.67 2430.00 2480.00
FEB 2410.00 2486.67 2500.00 2403.33 2446.67 2480.00
MAC 2443.33 2536.67 2550.00 2453.33 2503.33 2526.67
APR 2510.00 2580.00 2600.00 2496.67 2550.00 2550.00
MEI 2596.67 2650.00 2700.00 2600.00 2650.00 2650.00
JUN 2550.00 2550.00 2600.00 2550.00 2650.00 2650.00
JUL 2500.00 2500.00 2550.00 2500.00 2600.00 2600.00
OGO 2500.00 2500.00 2550.00 2500.00 2600.00 2600.00
SEP 2500.00 2500.00 2550.00 2500.00 2600.00 2600.00
OKT 2450.00 2450.00 2500.00 2450.00 2550.00 2550.00
NOV 2500.00 2500.00 2550.00 2500.00 2600.00 2600.00
DIS 2550.00 2550.00 2600.00 2500.00 2600.00 2600.00

12mm (1/2") 2009 DIS 2130.00 2250.00 2350.00 2220.00 2245.00 2225.00
2010 JAN 2360.00 2420.00 2450.00 2386.67 2430.00 2480.00
FEB 2360.00 2430.00 2450.00 2403.33 2446.67 2480.00
MAC 2393.33 2480.00 2500.00 2453.33 2503.33 2526.67
APR 2460.00 2530.00 2550.00 2503.33 2536.67 2550.00
MEI 2550.00 2600.00 2650.00 2600.00 2650.00 2650.00
JUN 2500.00 2500.00 2550.00 2500.00 2600.00 2600.00
JUL 2450.00 2450.00 2500.00 2450.00 2550.00 2550.00
OGO 2450.00 2450.00 2500.00 2450.00 2550.00 2550.00
SEP 2450.00 2450.00 2500.00 2450.00 2550.00 2550.00
OKT 2400.00 2400.00 2450.00 2400.00 2500.00 2500.00
NOV 2450.00 2450.00 2500.00 2450.00 2550.00 2550.00
DIS 2500.00 2500.00 2550.00 2450.00 2550.00 2550.00

* Lihat lampiran A / See appendix A

-9-
Jadual 1 (Samb.) - Harga Unit Purata Bagi Bar Keluli dan Simen
Table 1 (Cont'd.) - Average Unit Prices for Steel Bars and Cement
Kawasan*
Region
Sabah Sarawak
Perkara Tempoh Sabah Sarawak
Item Period
G H I J K L
(2) Mycon 60 (Samb.) RM Per Tan Metrik
High Tensile Deformed Bars (Cont'd.) RM Per Metric Ton

16mm - 25mm 2009 DIS 2150.00 2213.33 2300.00 2160.00 2183.33 2200.00
(5/8" - 1") 2010 JAN 2310.00 2380.00 2400.00 2286.67 2343.33 2380.00
FEB 2310.00 2386.67 2400.00 2303.33 2360.00 2380.00
MAC 2360.00 2436.67 2450.00 2353.33 2416.67 2426.67
APR 2416.67 2486.67 2500.00 2403.33 2460.00 2480.00
MEI 2506.67 2550.00 2600.00 2511.11 2550.00 2553.33
JUN 2450.00 2450.00 2500.00 2450.00 2500.00 2500.00
JUL 2400.00 2400.00 2450.00 2400.00 2450.00 2450.00
OGO 2400.00 2400.00 2450.00 2400.00 2450.00 2450.00
SEP 2400.00 2400.00 2450.00 2400.00 2450.00 2450.00
OKT 2350.00 2350.00 2400.00 2350.00 2400.00 2400.00
NOV 2400.00 2400.00 2450.00 2400.00 2450.00 2450.00
DIS 2450.00 2450.00 2500.00 2400.00 2450.00 2450.00

32mm (1 1/4") 2009 DIS 2150.00 2213.33 2300.00 2160.00 2183.33 2200.00
2010 JAN 2310.00 2380.00 2400.00 2286.67 2343.33 2380.00
FEB 2310.00 2386.67 2400.00 2303.33 2360.00 2380.00
MAC 2360.00 2436.67 2450.00 2353.33 2416.67 2426.67
APR 2416.67 2486.67 2500.00 2403.33 2460.00 2480.00
MEI 2506.67 2550.00 2600.00 2516.67 2550.00 2553.33
JUN 2450.00 2450.00 2500.00 2450.00 2500.00 2500.00
JUL 2400.00 2400.00 2450.00 2400.00 2450.00 2450.00
OGO 2400.00 2400.00 2450.00 2400.00 2450.00 2450.00
SEP 2400.00 2400.00 2450.00 2400.00 2450.00 2450.00
OKT 2350.00 2350.00 2400.00 2350.00 2400.00 2400.00
NOV 2400.00 2400.00 2450.00 2400.00 2450.00 2450.00
DIS 2450.00 2450.00 2500.00 2400.00 2450.00 2450.00

* Lihat lampiran A / See appendix A

- 10 -
Jadual 1 (Samb.) - Harga Unit Purata Bagi Bar Keluli dan Simen
Table 1 (Cont'd.) - Average Unit Prices for Steel Bars and Cement
Kawasan*
Region
Sabah Sarawak
Perkara Tempoh Sabah Sarawak
Item Period
G H I J K L
(3) Simen RM Sekarung 50 Kg
Cement RM Per 50 Kg Bag

Portland Biasa 2009 DIS 16.30 16.30 16.50 14.30 15.50 15.80
BS 12 2010 JAN 16.30 16.30 16.50 14.30 15.50 15.80
Ordinary Portland FEB 16.30 16.30 16.50 14.30 15.50 15.80
BS 12 MAC 16.30 16.30 16.50 14.30 15.50 15.80
APR 16.30 16.30 16.50 14.30 15.50 15.80
MEI 17.30 17.30 17.00 15.30 15.80 16.80
JUN 17.30 17.30 17.00 15.30 15.80 16.80
JUL 17.30 17.30 17.00 15.30 15.80 16.80
OGO 17.30 17.30 17.00 15.30 15.80 16.80
SEP 17.30 17.30 17.00 15.30 15.80 16.80
OKT 17.30 17.30 17.00 15.30 15.80 16.80
NOV 17.30 17.30 17.00 15.30 15.80 16.80
DIS 17.30 17.30 17.00 15.30 15.80 16.80

* Lihat lampiran A / See appendix A

- 11 -
Jadual 2 - Harga Unit Purata Bagi Pasir, Batu Baur, Premix , Fabric Reinforcement dan Guardrail
Table 2 - Average Unit Prices for Sand, Aggregates, Premix, Fabric Reinforcement and Guardrail
Kawasan*
Region
Sabah Sarawak **
Perkara Tempoh Sabah Sarawak **
Item Period
G H I J K L
(1) Pasir RM Per Tan Metrik
Sand RM Per Metric Ton
Pasir Sungai 2009 DIS 32.80 58.30 40.00 35.70 23.60 31.00
River Sand 2010 JAN 32.80 58.30 40.00 36.00 23.60 31.00
FEB 32.80 58.30 40.00 36.30 23.60 31.00
MAC 32.80 58.30 40.00 36.30 23.60 31.00
APR 32.80 58.30 40.00 36.30 23.60 31.00
MEI 32.80 58.30 40.00 36.30 23.60 31.00
JUN 32.80 58.30 40.00 36.30 23.60 31.00
JUL 32.80 58.30 40.00 36.70 23.60 31.00
OGO 32.80 58.30 40.00 36.70 23.60 31.00
SEP 32.80 58.30 40.00 38.00 23.60 31.00
OKT 32.80 58.30 40.00 37.70 23.60 31.00
NOV 32.80 58.30 40.00 37.70 23.60 31.00
DIS 32.80 58.30 40.00 37.70 23.60 31.00
(2) Batu Baur
Aggregates
Granite 10mm (3/8") 2009 DIS 39.00 59.00 32.50 23.80 50.30 47.00
Granite 10mm (3/8") 2010 JAN 39.00 59.00 32.50 23.80 51.30 51.00
FEB 39.00 59.00 32.50 25.30 51.30 51.00
MAC 39.00 59.00 32.50 25.30 51.00 51.00
APR 39.00 59.00 32.50 25.30 51.00 51.00
MEI 39.00 59.00 33.50 25.30 51.00 51.00
JUN 39.00 59.00 33.50 25.30 51.00 51.00
JUL 39.00 59.00 37.00 25.30 51.00 51.00
OGO 39.00 59.00 37.00 25.30 53.50 51.00
SEP 39.00 59.00 37.00 25.30 53.50 51.00
OKT 39.00 59.00 37.00 25.30 53.50 51.00
NOV 39.00 59.00 37.00 25.30 53.50 51.00
DIS 39.00 59.00 37.00 25.30 55.80 51.00
Harga bagi pasir, batu baur dan premix adalah termasuk kos pengangkutan bagi jarak 30km dari outlet.
The prices for sand, aggregates and premix are inclusive of transportation charge for 30km from the outlets.
* Lihat lampiran A / See appendix A
** Harga pasir di Sarawak adalah untuk tujuan kerja-kerja konkrit sahaja.
** The sand price in Sarawak is for the purpose of concrete works only.
- 12 -
Jadual 2 (Samb.) - Harga Unit Purata Bagi Pasir, Batu Baur, Premix, Fabric Reinforcement dan Guardrail
Table 2 (Cont'd.) - Average Unit Prices for Sand, Aggregates, Premix, Fabric Reinforcement and Guardrail

Kawasan*
Region
Sabah Sarawak
Perkara Tempoh Sabah Sarawak
Item Period
G H I J K L

(2) Batu Baur (Samb.) RM Per Tan Metrik


Aggregates (Cont'd.) RM Per Metric Ton

Granite 20mm (3/4") 2009 DIS 53.00 70.00 40.00 29.00 29.00 29.00
Granite 20mm (3/4") 2010 JAN 53.00 70.00 40.00 31.30 31.30 31.30
FEB 53.00 70.00 40.00 31.30 31.30 31.30
R R R
MAC 53.00 70.00 40.00 31.30 31.30 31.30
APR 53.00 70.00 40.00 33.30 33.30 33.30
MEI 53.00 70.00 40.50 33.30 33.30 33.30
JUN 53.00 70.00 40.50 33.30 33.30 33.30
JUL 53.00 70.00 37.00 33.30 33.30 33.30
OGO 53.00 70.00 40.50 33.30 33.30 33.30
SEP 53.00 70.00 40.50 33.30 33.30 33.30
OKT 53.00 70.00 40.50 33.30 33.30 33.30
NOV 53.00 70.00 40.50 33.30 33.30 33.30
DIS 53.00 70.00 40.50 33.30 33.30 33.30

Granite 40mm ( 11/2") 2009 DIS 51.50 na 38.00 18.10 43.60 41.00
Granite 40mm (11/2") 2010 JAN 51.50 na 38.00 18.10 47.00 45.00
FEB 51.50 na 38.00 19.60 48.00 45.00
MAC 51.50 na 38.00 19.60 47.00 45.00
APR 51.50 na 38.00 19.60 47.00 45.00
MEI 51.50 na 38.00 19.60 47.00 45.00
JUN 51.50 na 38.00 19.60 47.00 45.00
JUL 51.50 na 38.00 19.60 47.00 45.00
OGO 51.50 na 38.00 19.60 47.00 45.00
SEP 51.50 na 38.00 19.60 47.00 45.00
OKT 51.50 na 38.00 19.60 47.00 45.00
NOV 51.50 na 38.00 19.60 47.00 45.00
DIS 51.50 na 38.00 19.60 47.00 45.00

na = Tidak diperoleh / Not available


R = Kemaskini / Revised
* Lihat lampiran A / See appendix A

- 13 -
Jadual 2 (Samb.) - Harga Unit Purata Bagi Pasir, Batu Baur, Premix, Fabric Reinforcement dan Guardrail
Table 2 (Cont'd.) - Average Unit Prices for Sand, Aggregates, Premix, Fabric Reinforcement and Guardrail

Kawasan*
Region
Sabah Sarawak
Perkara Tempoh Sabah Sarawak
Item Period
G H I J K L
(2) Crushed Aggregate (Crusher Run) RM Per Tan Metrik
Crushed Aggregates (Crusher Run) RM Per Metric Ton

Crusher Run 2009 DIS 39.80 47.00 33.00 20.20 37.00 41.00
Crusher Run 2010 JAN 39.80 47.00 33.00 20.20 37.00 45.00
FEB 39.80 47.00 33.00 21.20 37.00 45.00
MAC 39.80 47.00 33.00 21.20 38.50 45.00
APR 39.80 47.00 34.00 21.20 38.50 45.00
MEI 39.80 47.00 34.00 21.20 38.50 45.00
JUN 39.80 47.00 34.00 21.20 38.50 45.00
JUL 39.80 47.00 34.00 21.20 38.50 45.00
OGO 39.80 47.00 34.00 21.20 38.50 45.00
SEP 39.80 47.00 34.00 21.20 38.50 45.00
OKT 39.80 47.00 34.00 21.20 38.50 45.00
NOV 39.80 47.00 34.00 21.20 38.50 45.00
DIS 39.80 47.00 34.00 21.20 38.50 45.00

* Lihat lampiran A / See appendix A

- 14 -
Jadual 2 (Samb.) - Harga Unit Purata Bagi Pasir, Batu Baur, Premix, Fabric Reinforcement dan Guardrail
Table 2 (Cont'd.) - Average Unit Prices for Sand, Aggregates, Premix, Fabric Reinforcement and Guardrail

Kawasan*
Region
Sabah Sarawak
Perkara Tempoh Sabah Sarawak
Item Period
G H I J K L

(2) Batu Baur RM Per Tan Metrik


Aggregates RM Per Metric Ton

Sandstone 20mm(3/4") 2009 DIS 46.00 49.00 35.00 na na na


Sandstone 20mm(3/4") 2010 JAN 46.00 49.00 35.00 na na na
FEB 46.00 49.00 35.00 na na na
MAC 46.00 49.00 35.00 na na na
APR 46.00 49.00 37.00 na na na
MEI 46.00 49.00 37.00 na na na
JUN 46.00 49.00 37.00 na na na
JUL 46.00 49.00 37.00 na na na
OGO 46.00 49.00 37.00 na na na
SEP 46.00 49.00 37.00 na na na
OKT 46.00 49.00 37.00 na na na
NOV 46.00 49.00 37.00 na na na
DIS 46.00 49.00 37.00 na na na

Limestone 20mm (3/4") 2009 DIS na na na 20.00 20.00 37.00


Limestone 20mm (3/4") 2010 JAN na na na 20.00 20.00 39.00
FEB na na na 20.00 20.00 39.00
MAC na na na 20.00 20.00 39.00
APR na na na 20.00 20.00 39.00
MEI na na na 20.00 20.00 39.00
JUN na na na 20.00 20.00 39.00
JUL na na na 20.00 20.00 39.00
OGO na na na 20.00 20.00 39.00
SEP na na na 20.00 20.00 39.00
OKT na na na 20.00 20.00 39.00
NOV na na na 20.00 20.00 39.00
DIS na na na 20.75 20.75 39.00

na = Tidak diperoleh / Not available


* Lihat lampiran A / See appendix A

- 15 -
Jadual 2 (Samb.) - Harga Unit Purata Bagi Pasir, Batu Baur, Premix, Fabric Reinforcement dan Guardrail
Table 2 (Cont'd.) - Average Unit Prices for Sand, Aggregates, Premix, Fabric Reinforcement and Guardrail

Kawasan*
Region
Sabah Sarawak
Perkara Tempoh Sabah Sarawak
Item Period
G H I J K L

(3) Premix Asphaltic Concrete RM Per Tan Metrik


Premix Asphaltic Concrete RM Per Metric Ton

AC 10(Wearing Course) 2009 DIS 238.30 300.00 na 177.00 187.50 190.00


2010 JAN 238.30 300.00 na 177.00 187.50 190.00
FEB 238.30 300.00 na 177.00 187.50 190.00
MAC 238.30 300.00 na 177.00 187.50 190.00
APR 240.00 300.00 na 177.00 187.50 190.00
MEI 240.00 300.00 na 187.00 187.50 190.00
JUN 240.00 300.00 na 187.00 187.50 190.00
JUL 240.00 300.00 na 187.00 187.50 190.00
OGO 240.00 300.00 na 187.00 192.50 190.00
SEP 240.00 300.00 na 187.00 192.50 190.00
OKT 240.00 300.00 na 187.00 192.50 190.00
NOV 240.00 300.00 na 187.00 192.50 190.00
DIS 240.00 300.00 na 187.00 192.50 190.00

AC 14(Wearing Course) 2009 DIS 238.30 300.00 217.00 177.00 187.50 190.00
2010 JAN 238.30 300.00 228.00 177.00 187.50 190.00
FEB 238.30 300.00 229.00 177.00 187.50 190.00
MAC 238.30 300.00 229.00 177.00 187.50 190.00
APR 240.00 300.00 239.00 177.00 187.50 190.00
MEI 240.00 300.00 245.00 187.00 187.50 190.00
JUN 240.00 300.00 245.00 187.00 187.50 190.00
JUL 240.00 300.00 230.00 187.00 187.50 190.00
OGO 240.00 300.00 230.00 187.00 192.50 190.00
SEP 240.00 300.00 230.00 187.00 192.50 190.00
OKT 240.00 300.00 230.00 187.00 192.50 190.00
NOV 240.00 300.00 230.00 187.00 192.50 190.00
DIS 240.00 300.00 230.00 187.00 192.50 190.00

na = Tidak diperoleh / Not available


* Lihat lampiran A / See appendix A

- 16 -
Jadual 2 (Samb.) - Harga Unit Purata Bagi Pasir, Batu Baur, Premix, Fabric Reinforcement dan Guardrail
Table 2 (Cont'd.) - Average Unit Prices for Sand, Aggregates, Premix, Fabric Reinforcement and Guardrail

Kawasan*
Region
Sabah Sarawak
Perkara Tempoh Sabah Sarawak
Item Period
G H I J K L

(3) Premix Asphaltic Concrete (Samb.) RM Per Tan Metrik


Premix Asphaltic Concrete (Cont'd.) RM Per Metric Ton

AC 28 (Binder Course) 2009 DIS 235.00 300.00 217.50 172.00 187.50 190.00
2010 JAN 235.00 300.00 217.50 172.00 187.50 190.00
FEB 235.00 300.00 217.50 172.50 187.50 190.00
MAC 235.00 300.00 217.50 172.50 187.50 190.00
APR 235.00 300.00 217.50 172.50 187.50 190.00
MEI 235.00 300.00 na 180.00 187.50 190.00
JUN 235.00 300.00 na 180.00 187.50 190.00
JUL 235.00 300.00 na 180.00 187.50 190.00
OGO 235.00 300.00 na 180.00 192.50 190.00
SEP 235.00 300.00 na 180.00 192.50 190.00
OKT 235.00 300.00 na 180.00 192.50 190.00
NOV 235.00 300.00 na 180.00 192.50 190.00
DIS 235.00 300.00 na 180.00 192.50 190.00

ACW 20 (Wearing Course) 2009 DIS 236.70 300.00 213.00 177.00 187.50 190.00
2010 JAN 236.70 300.00 225.00 192.00 187.50 190.00
FEB 236.70 300.00 225.00 192.00 187.50 190.00
MAC 236.70 300.00 225.00 192.00 187.50 190.00
APR 236.70 300.00 235.00 192.00 187.50 190.00
MEI 236.70 300.00 240.00 199.50 187.50 190.00
JUN 236.70 300.00 256.00 199.50 187.50 190.00
JUL 236.70 300.00 225.00 199.50 187.50 190.00
OGO 236.70 300.00 230.00 199.50 192.50 190.00
SEP 236.70 300.00 230.00 199.50 192.50 190.00
OKT 236.70 300.00 230.00 199.50 192.50 190.00
NOV 236.70 300.00 230.00 199.50 192.50 190.00
DIS 236.70 300.00 230.00 199.50 192.50 190.00

na = Tidak diperoleh / Not available


* Lihat lampiran A / See appendix A

- 17 -
Jadual 2 (Samb.) - Harga Unit Purata Bagi Pasir, Batu Baur, Premix, Fabric Reinforcement dan Guardrail
Table 2 (Cont'd.) - Average Unit Prices for Sand, Aggregates, Premix, Fabric Reinforcement and Guardrail

Kawasan*
Region
Sabah Sarawak
Perkara Tempoh Sabah Sarawak
Item Period
G H I J K L

(3) Premix Bituminous Macadam RM Per Tan Metrik


Premix Bituminous Macadam RM Per Metric Ton

BMR40 (Bound Roadbase) 2009 DIS na na na na na na


2010 JAN na na na 145.00 na na
FEB na na na 145.00 na na
MAC na na na 145.00 na na
APR na na na 145.00 na na
MEI na na na 160.00 na na
JUN na na na 160.00 na na
JUL na na na 160.00 na na
OGO na na na 160.00 na na
SEP na na na 160.00 na na
OKT na na na 160.00 na na
NOV na na na 160.00 na na
DIS na na na 160.00 na na

BMR28 (Bound Roadbase) 2009 DIS na na na na na na


2010 JAN na na na 155.00 na na
FEB na na na 155.00 na na
MAC na na na 155.00 na na
APR na na na 155.00 na na
MEI na na na 170.00 na na
JUN na na na 170.00 na na
JUL na na na 170.00 na na
OGO na na na 170.00 na na
SEP na na na 170.00 na na
OKT na na na 170.00 na na
NOV na na na 170.00 na na
DIS na na na 170.00 na na

na = Tidak diperoleh / Not available


* Lihat lampiran A / See appendix A

- 18 -
Jadual 2 (Samb.) - Harga Unit Purata Bagi Pasir, Batu Baur, Premix, Fabric Reinforcement dan Guardrail
Table 2 (Cont'd.) - Average Unit Prices for Sand, Aggregates, Premix, Fabric Reinforcement and Guardrail

Kawasan*
Region
Sabah Sarawak
Perkara Tempoh Sabah Sarawak
Item Period
G H I J K L

(3) Premix Bituminous Macadam RM Per Tan Metrik


Premix Bituminous Macadam RM Per Metric Ton

BML10 (Levelling Course) 2009 DIS na na na na na na


2010 JAN na na na 165.00 na na
FEB na na na 165.00 na na
MAC na na na 165.00 na na
APR na na na 165.00 na na
MEI na na na 180.00 na na
JUN na na na 180.00 na na
JUL na na na 180.00 na na
OGO na na na 180.00 na na
SEP na na na 180.00 na na
OKT na na na 180.00 na na
NOV na na na 180.00 na na
DIS na na na 180.00 na na

BMB28 (Binder Course) 2009 DIS na na na na na na


2010 JAN na na na 160.00 na na
FEB na na na 160.00 na na
MAC na na na 160.00 na na
APR na na na 160.00 na na
MEI na na na 170.00 na na
JUN na na na 170.00 na na
JUL na na na 170.00 na na
OGO na na na 170.00 na na
SEP na na na 170.00 na na
OKT na na na 170.00 na na
NOV na na na 170.00 na na
DIS na na na 170.00 na na

na = Tidak diperoleh / Not available


* Lihat lampiran A / See appendix A

- 19 -
Jadual 2 (Samb.) - Harga Unit Purata Bagi Pasir, Batu Baur, Premix, Fabric Reinforcement dan Guardrail
Table 2 (Cont'd.) - Average Unit Prices for Sand, Aggregates, Premix, Fabric Reinforcement and Guardrail

Kawasan*
Region
Sabah Sarawak
Perkara Tempoh Sabah Sarawak
Item Period
G H I J K L

(3) Premix Bituminous Macadam RM Per Tan Metrik


Premix Bituminous Macadam RM Per Metric Ton

BMB20 (Binder Course) 2009 DIS na na na na na na


2010 JAN na na na 160.00 na na
FEB na na na 160.00 na na
MAC na na na 160.00 na na
APR na na na 160.00 na na
MEI na na na 175.00 na na
JUN na na na 175.00 na na
JUL na na na 175.00 na na
OGO na na na 175.00 na na
SEP na na na 175.00 na na
OKT na na na 175.00 na na
NOV na na na 175.00 na na
DIS na na na 175.00 na na

BMW14 (Wearing Course) 2009 DIS na na na na na na


2010 JAN na na na 165.00 na na
FEB na na na 165.00 na na
MAC na na na 165.00 na na
APR na na na 165.00 na na
MEI na na na 180.00 na na
JUN na na na 180.00 na na
JUL na na na 180.00 na na
OGO na na na 180.00 na na
SEP na na na 180.00 na na
OKT na na na 180.00 na na
NOV na na na 180.00 na na
DIS na na na 180.00 na na

na = Tidak diperoleh / Not available


* Lihat lampiran A / See appendix A

- 20 -
Jadual 2 (Samb.) - Harga Unit Purata Bagi Pasir, Batu Baur, Premix, Fabric Reinforcement dan Guardrail
Table 2 (Cont'd.) - Average Unit Prices for Sand, Aggregates, Premix, Fabric Reinforcement and Guardrail

Kawasan*
Region
Sabah Sarawak
Perkara Tempoh Sabah Sarawak
Item Period
G H I J K L

(3) Premix Bituminous Macadam RM Per Tan Metrik


Premix Bituminous Macadam RM Per Metric Ton

BMB20 (Binder Course) 2009 DIS na na na na na na


2010 JAN na na na 165.00 na na
FEB na na na 165.00 na na
MAC na na na 165.00 na na
APR na na na 165.00 na na
MEI na na na 180.00 na na
JUN na na na 180.00 na na
JUL na na na 180.00 na na
OGO na na na 180.00 na na
SEP na na na 180.00 na na
OKT na na na 180.00 na na
NOV na na na 180.00 na na
DIS na na na 180.00 na na

na = Tidak diperoleh / Not available


* Lihat lampiran A / See appendix A

- 21 -
Jadual 2 (Samb.) - Harga Unit Purata Bagi Pasir, Batu Baur, Premix, Fabric Reinforcement dan Guardrail
Table 2 (Cont'd.) - Average Unit Prices for Sand, Aggregates, Premix, Fabric Reinforcement and Guardrail

Kawasan*
Region
Sabah Sarawak
Perkara Tempoh Sabah Sarawak
Item Period
G H I J K L
(4) Fabric Reinforcement RM Per Kg
Fabric Reinforcement RM Per Kg

A4, MS145 2009 DIS 4.77 5.17 5.06 4.77 4.77 4.77
2010 JAN 3.62 3.89 4.01 3.63 3.85 4.12
FEB 3.62 3.92 4.03 3.63 3.89 4.15
MAC 3.62 3.92 4.03 3.63 3.89 4.15
APR 3.62 3.92 4.03 3.63 3.89 4.15
MEI 3.70 3.91 4.05 3.64 3.96 4.21
JUN 3.78 3.97 4.05 3.64 3.96 4.21
JUL 3.78 3.97 4.05 3.64 3.96 4.21
OGO 3.78 3.97 4.05 3.64 3.96 4.21
SEP 3.78 3.97 4.05 3.64 3.96 4.21
OKT 3.78 3.97 4.05 3.64 3.96 4.21
NOV 3.78 3.97 4.05 3.64 3.96 4.21
DIS 3.78 3.97 4.05 3.64 3.96 4.21

A5, MS145 2009 DIS 4.24 4.59 4.50 4.24 4.24 4.24
2010 JAN 3.22 3.46 3.57 3.23 3.43 3.66
FEB 3.22 3.48 3.58 3.23 3.46 3.69
MAC 3.22 3.48 3.58 3.23 3.46 3.69
APR 3.22 3.48 3.58 3.23 3.46 3.69
MEI 3.29 3.47 3.60 3.24 3.52 3.74
JUN 3.36 3.53 3.60 3.24 3.52 3.74
JUL 3.36 3.53 3.60 3.24 3.52 3.74
OGO 3.36 3.53 3.60 3.24 3.52 3.74
SEP 3.36 3.53 3.60 3.24 3.52 3.74
OKT 3.36 3.53 3.60 3.24 3.52 3.74
NOV 3.36 3.53 3.60 3.24 3.52 3.74
DIS 3.36 3.53 3.60 3.24 3.52 3.74

Mulai Januari 2010, harga fabric reinforcement tidak termasuk kos pemotongan.
Starting from January 2010, the fabric reinforcement prices do not include cutting services fee.
* Lihat lampiran A / See appendix A

- 22 -
Jadual 2 (Samb.) - Harga Unit Purata Bagi Pasir, Batu Baur, Premix, Fabric Reinforcement dan Guardrail
Table 2 (Cont'd.) - Average Unit Prices for Sand, Aggregates, Premix, Fabric Reinforcement and Guardrail

Kawasan*
Region
Sabah Sarawak
Perkara Tempoh Sabah Sarawak
Item Period
G H I J K L

(4) Fabric Reinforcement (Samb.) RM Per Kg


Fabric Reinforcement (Cont'd.) RM Per Kg

A6, MS145 2009 DIS 4.11 4.45 4.36 4.11 4.11 4.11
2010 JAN 3.12 3.35 3.46 3.13 3.32 3.55
FEB 3.12 3.38 3.47 3.13 3.35 3.57
MAC 3.12 3.38 3.47 3.13 3.35 3.57
APR 3.12 3.38 3.47 3.13 3.35 3.57
MEI 3.18 3.36 3.49 3.14 3.41 3.63
JUN 3.26 3.42 3.49 3.14 3.41 3.63
JUL 3.26 3.42 3.49 3.14 3.41 3.63
OGO 3.26 3.42 3.49 3.14 3.41 3.63
SEP 3.26 3.42 3.49 3.14 3.41 3.63
OKT 3.26 3.42 3.49 3.14 3.41 3.63
NOV 3.26 3.42 3.49 3.14 3.41 3.63
DIS 3.26 3.42 3.49 3.14 3.41 3.63

A7, MS145 2009 DIS 3.97 4.30 4.22 3.97 3.97 3.97
2010 JAN 3.02 3.25 3.34 3.02 3.21 3.43
FEB 3.02 3.27 3.36 3.02 3.25 3.45
MAC 3.02 3.27 3.36 3.02 3.25 3.45
APR 3.02 3.27 3.36 3.02 3.25 3.45
MEI 3.08 3.26 3.38 3.04 3.30 3.51
JUN 3.15 3.31 3.38 3.04 3.30 3.51
JUL 3.15 3.31 3.38 3.04 3.30 3.51
OGO 3.15 3.31 3.38 3.04 3.30 3.51
SEP 3.15 3.31 3.38 3.04 3.30 3.51
OKT 3.15 3.31 3.38 3.04 3.30 3.51
NOV 3.15 3.31 3.38 3.04 3.30 3.51
DIS 3.15 3.31 3.38 3.04 3.30 3.51

* Lihat lampiran A / See appendix A

- 23 -
Jadual 2 (Samb.) - Harga Unit Purata Bagi Pasir, Batu Baur, Premix, Fabric Reinforcement dan Guardrail
Table 2 (Cont'd.) - Average Unit Prices for Sand, Aggregates, Premix, Fabric Reinforcement and Guardrail

Kawasan*
Region
Sabah Sarawak
Perkara Tempoh Sabah Sarawak
Item Period
G H I J K L

(4) Fabric Reinforcement (Samb.) RM Per Kg


Fabric Reinforcement (Cont'd.) RM Per Kg

A8, MS145 2009 DIS 3.96 4.29 4.20 3.96 3.96 3.96
2010 JAN 3.01 3.23 3.33 3.01 3.20 3.42
FEB 3.01 3.26 3.34 3.01 3.23 3.44
MAC 3.01 3.26 3.34 3.01 3.23 3.44
APR 3.01 3.26 3.34 3.01 3.23 3.44
MEI 3.07 3.25 3.37 3.03 3.29 3.50
JUN 3.14 3.30 3.37 3.03 3.29 3.50
JUL 3.14 3.30 3.37 3.03 3.29 3.50
OGO 3.14 3.30 3.37 3.03 3.29 3.50
SEP 3.14 3.30 3.37 3.03 3.29 3.50
OKT 3.14 3.30 3.37 3.03 3.29 3.50
NOV 3.14 3.30 3.37 3.03 3.29 3.50
DIS 3.14 3.30 3.37 3.03 3.29 3.50

A9, MS145 2009 DIS 3.87 4.19 4.10 3.87 3.87 3.87
2010 JAN 2.94 3.16 3.26 2.94 3.13 3.34
FEB 2.94 3.18 3.27 2.94 3.16 3.36
MAC 2.94 3.18 3.27 2.94 3.16 3.36
APR 2.94 3.18 3.27 2.94 3.16 3.36
MEI 3.00 3.17 3.29 2.95 3.21 3.42
JUN 3.07 3.22 3.29 2.95 3.21 3.42
JUL 3.07 3.22 3.29 2.95 3.21 3.42
OGO 3.07 3.22 3.29 2.95 3.21 3.42
SEP 3.07 3.22 3.29 2.95 3.21 3.42
OKT 3.07 3.22 3.29 2.95 3.21 3.42
NOV 3.07 3.22 3.29 2.95 3.21 3.42
DIS 3.07 3.22 3.29 2.95 3.21 3.42

* Lihat lampiran A / See appendix A

- 24 -
Jadual 2 (Samb.) - Harga Unit Purata Bagi Pasir, Batu Baur, Premix, Fabric Reinforcement dan Guardrail
Table 2 (Cont'd.) - Average Unit Prices for Sand, Aggregates, Premix, Fabric Reinforcement and Guardrail

Kawasan*
Region
Sabah Sarawak
Perkara Tempoh Sabah Sarawak
Item Period
G H I J K L

(4) Fabric Reinforcement (Samb.) RM Per Kg


Fabric Reinforcement (Cont'd.) RM Per Kg

A10, MS145 2009 DIS 4.11 4.45 4.36 4.11 4.11 4.11
2010 JAN 3.12 3.35 3.46 3.13 3.32 3.55
FEB 3.12 3.38 3.47 3.13 3.35 3.57
MAC 3.12 3.38 3.47 3.13 3.35 3.57
APR 3.12 3.38 3.47 3.13 3.35 3.57
MEI 3.18 3.36 3.49 3.14 3.41 3.63
JUN 3.26 3.42 3.49 3.14 3.41 3.63
JUL 3.26 3.42 3.49 3.14 3.41 3.63
OGO 3.26 3.42 3.49 3.14 3.41 3.63
SEP 3.26 3.42 3.49 3.14 3.41 3.63
OKT 3.26 3.42 3.49 3.14 3.41 3.63
NOV 3.26 3.42 3.49 3.14 3.41 3.63
DIS 3.26 3.42 3.49 3.14 3.41 3.63

B5, MS145 2009 DIS 4.04 4.38 4.29 4.04 4.04 4.04
2010 JAN 3.07 3.30 3.40 3.07 3.27 3.49
FEB 3.07 3.32 3.41 3.07 3.30 3.51
MAC 3.07 3.32 3.41 3.07 3.30 3.51
APR 3.07 3.32 3.41 3.07 3.30 3.51
MEI 3.13 3.31 3.43 3.09 3.36 3.57
JUN 3.20 3.37 3.43 3.09 3.36 3.57
JUL 3.20 3.37 3.43 3.09 3.36 3.57
OGO 3.20 3.37 3.43 3.09 3.36 3.57
SEP 3.20 3.37 3.43 3.09 3.36 3.57
OKT 3.20 3.37 3.43 3.09 3.36 3.57
NOV 3.20 3.37 3.43 3.09 3.36 3.57
DIS 3.20 3.37 3.43 3.09 3.36 3.57

* Lihat lampiran A / See appendix A

- 25 -
Jadual 2 (Samb.) - Harga Unit Purata Bagi Pasir, Batu Baur, Premix, Fabric Reinforcement dan Guardrail
Table 2 (Cont'd.) - Average Unit Prices for Sand, Aggregates, Premix, Fabric Reinforcement and Guardrail

Kawasan*
Region
Sabah Sarawak
Perkara Tempoh Sabah Sarawak
Item Period
G H I J K L
(4) Fabric Reinforcement (Samb.) RM Per Kg
Fabric Reinforcement (Cont'd.) RM Per Kg

B6, MS145 2009 DIS 4.04 4.38 4.29 4.04 4.04 4.04
2010 JAN 3.07 3.30 3.40 3.07 3.27 3.49
FEB 3.07 3.32 3.41 3.07 3.30 3.51
MAC 3.07 3.32 3.41 3.07 3.30 3.51
APR 3.07 3.32 3.41 3.07 3.30 3.51
MEI 3.13 3.31 3.43 3.09 3.36 3.57
JUN 3.20 3.37 3.43 3.09 3.36 3.57
JUL 3.20 3.37 3.43 3.09 3.36 3.57
OGO 3.20 3.37 3.43 3.09 3.36 3.57
SEP 3.20 3.37 3.43 3.09 3.36 3.57
OKT 3.20 3.37 3.43 3.09 3.36 3.57
NOV 3.20 3.37 3.43 3.09 3.36 3.57
DIS 3.20 3.37 3.43 3.09 3.36 3.57

B7, MS145 2009 DIS 4.04 4.38 4.29 4.04 4.04 4.04
2010 JAN 3.07 3.30 3.40 3.07 3.27 3.49
FEB 3.07 3.32 3.41 3.07 3.30 3.51
MAC 3.07 3.32 3.41 3.07 3.30 3.51
APR 3.07 3.32 3.41 3.07 3.30 3.51
MEI 3.13 3.31 3.43 3.09 3.36 3.57
JUN 3.20 3.37 3.43 3.09 3.36 3.57
JUL 3.20 3.37 3.43 3.09 3.36 3.57
OGO 3.20 3.37 3.43 3.09 3.36 3.57
SEP 3.20 3.37 3.43 3.09 3.36 3.57
OKT 3.20 3.37 3.43 3.09 3.36 3.57
NOV 3.20 3.37 3.43 3.09 3.36 3.57
DIS 3.20 3.37 3.43 3.09 3.36 3.57

* Lihat lampiran A / See appendix A

- 26 -
Jadual 2 (Samb.) - Harga Unit Purata Bagi Pasir, Batu Baur, Premix, Fabric Reinforcement dan Guardrail
Table 2 (Cont'd.) - Average Unit Prices for Sand, Aggregates, Premix, Fabric Reinforcement and Guardrail

Kawasan*
Region
Sabah Sarawak
Perkara Tempoh Sabah Sarawak
Item Period
G H I J K L

(4) Fabric Reinforcement (Samb.) RM Per Kg


Fabric Reinforcement (Cont'd.) RM Per Kg

B8, MS145 2009 DIS 3.97 4.30 4.22 3.97 3.97 3.97
2010 JAN 3.02 3.25 3.34 3.02 3.21 3.43
FEB 3.02 3.27 3.36 3.02 3.25 3.45
MAC 3.02 3.27 3.36 3.02 3.25 3.45
APR 3.02 3.27 3.36 3.02 3.25 3.45
MEI 3.08 3.26 3.38 3.04 3.30 3.51
JUN 3.15 3.31 3.38 3.04 3.30 3.51
JUL 3.15 3.31 3.38 3.04 3.30 3.51
OGO 3.15 3.31 3.38 3.04 3.30 3.51
SEP 3.15 3.31 3.38 3.04 3.30 3.51
OKT 3.15 3.31 3.38 3.04 3.30 3.51
NOV 3.15 3.31 3.38 3.04 3.30 3.51
DIS 3.15 3.31 3.38 3.04 3.30 3.51

B9, MS145 2009 DIS 4.07 4.41 4.31 4.07 4.07 4.07
2010 JAN 3.09 3.32 3.42 3.09 3.29 3.51
FEB 3.09 3.34 3.43 3.09 3.32 3.54
MAC 3.09 3.34 3.43 3.09 3.32 3.54
APR 3.09 3.34 3.43 3.09 3.32 3.54
MEI 3.15 3.33 3.46 3.11 3.38 3.59
JUN 3.22 3.39 3.46 3.11 3.38 3.59
JUL 3.22 3.39 3.46 3.11 3.38 3.59
OGO 3.22 3.39 3.46 3.11 3.38 3.59
SEP 3.22 3.39 3.46 3.11 3.38 3.59
OKT 3.22 3.39 3.46 3.11 3.38 3.59
NOV 3.22 3.39 3.46 3.11 3.38 3.59
DIS 3.22 3.39 3.46 3.11 3.38 3.59

* Lihat lampiran A / See appendix A

- 27 -
Jadual 2 (Samb.) - Harga Unit Purata Bagi Pasir, Batu Baur, Premix, Fabric Reinforcement dan Guardrail
Table 2 (Cont'd.) - Average Unit Prices for Sand, Aggregates, Premix, Fabric Reinforcement and Guardrail

Kawasan*
Region
Sabah Sarawak
Perkara Tempoh Sabah Sarawak
Item Period
G H I J K L

(4) Fabric Reinforcement (Samb.) RM Per Kg


Fabric Reinforcement (Cont'd.) RM Per Kg

B10, MS145 2009 DIS 4.19 4.53 4.44 4.19 4.19 4.19
2010 JAN 3.18 3.42 3.52 3.19 3.38 3.62
FEB 3.18 3.44 3.53 3.19 3.42 3.64
MAC 3.18 3.44 3.53 3.19 3.42 3.64
APR 3.18 3.44 3.53 3.19 3.42 3.64
MEI 3.24 3.43 3.56 3.20 3.48 3.70
JUN 3.32 3.49 3.56 3.20 3.48 3.70
JUL 3.32 3.49 3.56 3.20 3.48 3.70
OGO 3.32 3.49 3.56 3.20 3.48 3.70
SEP 3.32 3.49 3.56 3.20 3.48 3.70
OKT 3.32 3.49 3.56 3.20 3.48 3.70
NOV 3.32 3.49 3.56 3.20 3.48 3.70
DIS 3.32 3.49 3.56 3.20 3.48 3.70

B12, MS145 2009 DIS 4.17 4.52 4.43 4.17 4.17 4.17
2010 JAN 3.17 3.41 3.51 3.18 3.37 3.60
FEB 3.17 3.43 3.52 3.18 3.41 3.63
MAC 3.17 3.43 3.52 3.18 3.41 3.63
APR 3.17 3.43 3.52 3.18 3.41 3.63
MEI 3.23 3.42 3.55 3.19 3.47 3.69
JUN 3.31 3.48 3.55 3.19 3.47 3.69
JUL 3.31 3.48 3.55 3.19 3.47 3.69
OGO 3.31 3.48 3.55 3.19 3.47 3.69
SEP 3.31 3.48 3.55 3.19 3.47 3.69
OKT 3.31 3.48 3.55 3.19 3.47 3.69
NOV 3.31 3.48 3.55 3.19 3.47 3.69
DIS 3.31 3.48 3.55 3.19 3.47 3.69

* Lihat lampiran A / See appendix A

- 28 -
Jadual 2 (Samb.) - Harga Unit Purata Bagi Pasir, Batu Baur, Premix, Fabric Reinforcement dan Guardrail
Table 2 (Cont'd.) - Average Unit Prices for Sand, Aggregates, Premix, Fabric Reinforcement and Guardrail

Kawasan*
Region
Sabah Sarawak
Perkara Tempoh Sabah Sarawak
Item Period
G H I J K L

(4) Fabric Reinforcement (Samb.) RM Per Kg


Fabric Reinforcement (Cont'd.) RM Per Kg

C5, MS145 2009 DIS 4.00 4.33 4.24 4.00 4.00 4.00
2010 JAN 3.04 3.27 3.37 3.04 3.23 3.46
FEB 3.04 3.29 3.38 3.04 3.27 3.48
MAC 3.04 3.29 3.38 3.04 3.27 3.48
APR 3.04 3.29 3.38 3.04 3.27 3.48
MEI 3.10 3.28 3.40 3.06 3.32 3.53
JUN 3.17 3.33 3.40 3.06 3.32 3.53
JUL 3.17 3.33 3.40 3.06 3.32 3.53
OGO 3.17 3.33 3.40 3.06 3.32 3.53
SEP 3.17 3.33 3.40 3.06 3.32 3.53
OKT 3.17 3.33 3.40 3.06 3.32 3.53
NOV 3.17 3.33 3.40 3.06 3.32 3.53
DIS 3.17 3.33 3.40 3.06 3.32 3.53

C6, MS145 2009 DIS 4.28 4.63 4.54 4.28 4.28 4.28
2010 JAN 3.25 3.49 3.60 3.26 3.46 3.70
FEB 3.25 3.52 3.61 3.26 3.49 3.72
MAC 3.25 3.52 3.61 3.26 3.49 3.72
APR 3.25 3.52 3.61 3.26 3.49 3.72
MEI 3.32 3.51 3.64 3.27 3.55 3.78
JUN 3.39 3.57 3.64 3.27 3.55 3.78
JUL 3.39 3.57 3.64 3.27 3.55 3.78
OGO 3.39 3.57 3.64 3.27 3.55 3.78
SEP 3.39 3.57 3.64 3.27 3.55 3.78
OKT 3.39 3.57 3.64 3.27 3.55 3.78
NOV 3.39 3.57 3.64 3.27 3.55 3.78
DIS 3.39 3.57 3.64 3.27 3.55 3.78

* Lihat lampiran A / See appendix A

- 29 -
Jadual 2 (Samb.) - Harga Unit Purata Bagi Pasir, Batu Baur, Premix, Fabric Reinforcement dan Guardrail
Table 2 (Cont'd.) - Average Unit Prices for Sand, Aggregates, Premix, Fabric Reinforcement and Guardrail

Kawasan*
Region
Sabah Sarawak
Perkara Tempoh Sabah Sarawak
Item Period
G H I J K L

(4) Fabric Reinforcement (Samb.) RM Per Kg


Fabric Reinforcement (Cont'd.) RM Per Kg

C7, MS145 2009 DIS 4.21 4.56 4.47 4.21 4.21 4.21
2010 JAN 3.20 3.44 3.55 3.21 3.40 3.64
FEB 3.20 3.46 3.56 3.21 3.44 3.66
MAC 3.20 3.46 3.56 3.21 3.44 3.66
APR 3.20 3.46 3.56 3.21 3.44 3.66
MEI 3.26 3.45 3.58 3.22 3.50 3.72
JUN 3.34 3.51 3.58 3.22 3.50 3.72
JUL 3.34 3.51 3.58 3.22 3.50 3.72
OGO 3.34 3.51 3.58 3.22 3.50 3.72
SEP 3.34 3.51 3.58 3.22 3.50 3.72
OKT 3.34 3.51 3.58 3.22 3.50 3.72
NOV 3.34 3.51 3.58 3.22 3.50 3.72
DIS 3.34 3.51 3.58 3.22 3.50 3.72

C8, MS145 2009 DIS 4.28 4.63 4.54 4.28 4.28 4.28
2010 JAN 3.25 3.49 3.60 3.26 3.46 3.70
FEB 3.25 3.52 3.61 3.26 3.49 3.72
MAC 3.25 3.52 3.61 3.26 3.49 3.72
APR 3.25 3.52 3.61 3.26 3.49 3.72
MEI 3.32 3.51 3.64 3.27 3.55 3.78
JUN 3.39 3.57 3.64 3.27 3.55 3.78
JUL 3.39 3.57 3.64 3.27 3.55 3.78
OGO 3.39 3.57 3.64 3.27 3.55 3.78
SEP 3.39 3.57 3.64 3.27 3.55 3.78
OKT 3.39 3.57 3.64 3.27 3.55 3.78
NOV 3.39 3.57 3.64 3.27 3.55 3.78
DIS 3.39 3.57 3.64 3.27 3.55 3.78

* Lihat lampiran A / See appendix A

- 30 -
Jadual 2 (Samb.) - Harga Unit Purata Bagi Pasir, Batu Baur, Premix, Fabric Reinforcement dan Guardrail
Table 2 (Cont'd.) - Average Unit Prices for Sand, Aggregates, Premix, Fabric Reinforcement and Guardrail

Kawasan*
Region
Sabah Sarawak
Perkara Tempoh Sabah Sarawak
Item Period
G H I J K L

(4) Fabric Reinforcement (Samb.) RM Per Kg


Fabric Reinforcement (Cont'd.) RM Per Kg

C9, MS145 2009 DIS 4.17 4.52 4.43 4.17 4.17 4.17
2010 JAN 3.17 3.41 3.51 3.18 3.37 3.60
FEB 3.17 3.43 3.52 3.18 3.41 3.63
MAC 3.17 3.43 3.52 3.18 3.41 3.63
APR 3.17 3.43 3.52 3.18 3.41 3.63
MEI 3.23 3.42 3.55 3.19 3.47 3.69
JUN 3.31 3.48 3.55 3.19 3.47 3.69
JUL 3.31 3.48 3.55 3.19 3.47 3.69
OGO 3.31 3.48 3.55 3.19 3.47 3.69
SEP 3.31 3.48 3.55 3.19 3.47 3.69
OKT 3.31 3.48 3.55 3.19 3.47 3.69
NOV 3.31 3.48 3.55 3.19 3.47 3.69
DIS 3.31 3.48 3.55 3.19 3.47 3.69

C10, MS145 2009 DIS 4.23 4.58 4.48 4.23 4.23 4.23
2010 JAN 3.21 3.45 3.56 3.22 3.42 3.65
FEB 3.21 3.47 3.57 3.22 3.45 3.67
MAC 3.21 3.47 3.57 3.22 3.45 3.67
APR 3.21 3.47 3.57 3.22 3.45 3.67
MEI 3.28 3.46 3.59 3.23 3.51 3.73
JUN 3.35 3.52 3.59 3.23 3.51 3.73
JUL 3.35 3.52 3.59 3.23 3.51 3.73
OGO 3.35 3.52 3.59 3.23 3.51 3.73
SEP 3.35 3.52 3.59 3.23 3.51 3.73
OKT 3.35 3.52 3.59 3.23 3.51 3.73
NOV 3.35 3.52 3.59 3.23 3.51 3.73
DIS 3.35 3.52 3.59 3.23 3.51 3.73

* Lihat lampiran A / See appendix A

- 31 -
Jadual 2 (Samb.) - Harga Unit Purata Bagi Pasir, Batu Baur, Premix, Fabric Reinforcement dan Guardrail
Table 2 (Cont'd.) - Average Unit Prices for Sand, Aggregates, Premix, Fabric Reinforcement and Guardrail

Kawasan*
Region
Sabah Sarawak
Perkara Tempoh Sabah Sarawak
Item Period
G H I J K L

(4) Fabric Reinforcement (Samb.) RM Per Kg


Fabric Reinforcement (Cont'd.) RM Per Kg

DA4, MS145 2009 DIS 4.33 4.69 4.60 4.33 4.33 4.33
2010 JAN 3.29 3.54 3.65 3.30 3.50 3.74
FEB 3.29 3.56 3.66 3.30 3.54 3.77
MAC 3.29 3.56 3.66 3.30 3.54 3.77
APR 3.29 3.56 3.66 3.30 3.54 3.77
MEI 3.36 3.55 3.68 3.31 3.60 3.83
JUN 3.43 3.61 3.68 3.31 3.60 3.83
JUL 3.43 3.61 3.68 3.31 3.60 3.83
OGO 3.43 3.61 3.68 3.31 3.60 3.83
SEP 3.43 3.61 3.68 3.31 3.60 3.83
OKT 3.43 3.61 3.68 3.31 3.60 3.83
NOV 3.43 3.61 3.68 3.31 3.60 3.83
DIS 3.43 3.61 3.68 3.31 3.60 3.83

DA5, MS145 2009 DIS 4.38 4.75 4.65 4.38 4.38 4.38
2010 JAN 3.33 3.58 3.69 3.34 3.54 3.79
FEB 3.33 3.60 3.70 3.34 3.58 3.81
MAC 3.33 3.60 3.70 3.34 3.58 3.81
APR 3.33 3.60 3.70 3.34 3.58 3.81
MEI 3.40 3.59 3.73 3.35 3.64 3.87
JUN 3.48 3.65 3.73 3.35 3.64 3.87
JUL 3.48 3.65 3.73 3.35 3.64 3.87
OGO 3.48 3.65 3.73 3.35 3.64 3.87
SEP 3.48 3.65 3.73 3.35 3.64 3.87
OKT 3.48 3.65 3.73 3.35 3.64 3.87
NOV 3.48 3.65 3.73 3.35 3.64 3.87
DIS 3.48 3.65 3.73 3.35 3.64 3.87

* Lihat lampiran A / See appendix A

- 32 -
Jadual 2 (Samb.) - Harga Unit Purata Bagi Pasir, Batu Baur, Premix, Fabric Reinforcement dan Guardrail
Table 2 (Cont'd.) - Average Unit Prices for Sand, Aggregates, Premix, Fabric Reinforcement and Guardrail

Kawasan*
Region
Sabah Sarawak
Perkara Tempoh Sabah Sarawak
Item Period
G H I J K L

(4) Fabric Reinforcement (Samb.) RM Per Kg


Fabric Reinforcement (Cont'd.) RM Per Kg

DA6, MS145 2009 DIS 4.25 4.61 4.51 4.25 4.25 4.25
2010 JAN 3.23 3.47 3.58 3.24 3.44 3.67
FEB 3.23 3.50 3.59 3.24 3.47 3.70
MAC 3.23 3.50 3.59 3.24 3.47 3.70
APR 3.23 3.50 3.59 3.24 3.47 3.70
MEI 3.30 3.48 3.61 3.25 3.53 3.76
JUN 3.37 3.54 3.61 3.25 3.53 3.76
JUL 3.37 3.54 3.61 3.25 3.53 3.76
OGO 3.37 3.54 3.61 3.25 3.53 3.76
SEP 3.37 3.54 3.61 3.25 3.53 3.76
OKT 3.37 3.54 3.61 3.25 3.53 3.76
NOV 3.37 3.54 3.61 3.25 3.53 3.76
DIS 3.37 3.54 3.61 3.25 3.53 3.76

DA7, MS145 2009 DIS 4.12 4.46 4.37 4.12 4.12 4.12
2010 JAN 3.13 3.36 3.47 3.14 3.33 3.56
FEB 3.13 3.39 3.48 3.14 3.36 3.58
MAC 3.13 3.39 3.48 3.14 3.36 3.58
APR 3.13 3.39 3.48 3.14 3.36 3.58
MEI 3.19 3.38 3.50 3.15 3.42 3.64
JUN 3.27 3.43 3.50 3.15 3.42 3.64
JUL 3.27 3.43 3.50 3.15 3.42 3.64
OGO 3.27 3.43 3.50 3.15 3.42 3.64
SEP 3.27 3.43 3.50 3.15 3.42 3.64
OKT 3.27 3.43 3.50 3.15 3.42 3.64
NOV 3.27 3.43 3.50 3.15 3.42 3.64
DIS 3.27 3.43 3.50 3.15 3.42 3.64

* Lihat lampiran A / See appendix A

- 33 -
Jadual 2 (Samb.) - Harga Unit Purata Bagi Pasir, Batu Baur, Premix, Fabric Reinforcement dan Guardrail
Table 2 (Cont'd.) - Average Unit Prices for Sand, Aggregates, Premix, Fabric Reinforcement and Guardrail

Kawasan*
Region
Sabah Sarawak
Perkara Tempoh Sabah Sarawak
Item Period
G H I J K L

(4) Fabric Reinforcement (Samb.) RM Per Kg


Fabric Reinforcement (Cont'd.) RM Per Kg

DA8, MS145 2009 DIS 4.05 4.39 4.30 4.05 4.05 4.05
2010 JAN 3.08 3.31 3.41 3.08 3.28 3.50
FEB 3.08 3.33 3.42 3.08 3.31 3.52
MAC 3.08 3.33 3.42 3.08 3.31 3.52
APR 3.08 3.33 3.42 3.08 3.31 3.52
MEI 3.14 3.32 3.45 3.10 3.37 3.58
JUN 3.21 3.38 3.45 3.10 3.37 3.58
JUL 3.21 3.38 3.45 3.10 3.37 3.58
OGO 3.21 3.38 3.45 3.10 3.37 3.58
SEP 3.21 3.38 3.45 3.10 3.37 3.58
OKT 3.21 3.38 3.45 3.10 3.37 3.58
NOV 3.21 3.38 3.45 3.10 3.37 3.58
DIS 3.21 3.38 3.45 3.10 3.37 3.58

DA9, MS145 2009 DIS 4.04 4.38 4.29 4.04 4.04 4.04
2010 JAN 3.07 3.30 3.40 3.07 3.27 3.49
FEB 3.07 3.32 3.41 3.07 3.30 3.51
MAC 3.07 3.32 3.41 3.07 3.30 3.51
APR 3.07 3.32 3.41 3.07 3.30 3.51
MEI 3.13 3.31 3.43 3.09 3.36 3.57
JUN 3.20 3.37 3.43 3.09 3.36 3.57
JUL 3.20 3.37 3.43 3.09 3.36 3.57
OGO 3.20 3.37 3.43 3.09 3.36 3.57
SEP 3.20 3.37 3.43 3.09 3.36 3.57
OKT 3.20 3.37 3.43 3.09 3.36 3.57
NOV 3.20 3.37 3.43 3.09 3.36 3.57
DIS 3.20 3.37 3.43 3.09 3.36 3.57

* Lihat lampiran A / See appendix A

- 34 -
Jadual 2 (Samb.) - Harga Unit Purata Bagi Pasir, Batu Baur, Premix, Fabric Reinforcement dan Guardrail
Table 2 (Cont'd.) - Average Unit Prices for Sand, Aggregates, Premix, Fabric Reinforcement and Guardrail

Kawasan*
Region
Sabah Sarawak
Perkara Tempoh Sabah Sarawak
Item Period
G H I J K L

(4) Fabric Reinforcement (Samb.) RM Per Kg


Fabric Reinforcement (Cont'd.) RM Per Kg

DA10, MS145 2009 DIS 4.21 4.56 4.47 4.21 4.21 4.21
2010 JAN 3.20 3.44 3.55 3.21 3.40 3.64
FEB 3.20 3.46 3.56 3.21 3.44 3.66
MAC 3.20 3.46 3.56 3.21 3.44 3.66
APR 3.20 3.46 3.56 3.21 3.44 3.66
MEI 3.26 3.45 3.58 3.22 3.50 3.72
JUN 3.34 3.51 3.58 3.22 3.50 3.72
JUL 3.34 3.51 3.58 3.22 3.50 3.72
OGO 3.34 3.51 3.58 3.22 3.50 3.72
SEP 3.34 3.51 3.58 3.22 3.50 3.72
OKT 3.34 3.51 3.58 3.22 3.50 3.72
NOV 3.34 3.51 3.58 3.22 3.50 3.72
DIS 3.34 3.51 3.58 3.22 3.50 3.72
* Lihat lampiran A / See appendix A

- 35 -
Jadual 2 (Samb.) - Harga Unit Purata Bagi Pasir, Batu Baur, Premix, Fabric Reinforcement dan Guardrail
Table 2 (Cont'd.) - Average Unit Prices for Sand, Aggregates, Premix, Fabric Reinforcement and Guardrail

Kawasan*
Region
Sabah Sarawak
Perkara Tempoh Sabah Sarawak
Item Period
G H I J K L

(5) Guardrail RM Per Meter


Guardrail RM Per Metre

Single Mounted 2009 DIS 311.50 327.08 342.65 311.50 327.08 342.65
i)1.95m Post Spacing 2010 JAN 280.50 na na 243.60 na na
FEB 280.50 na na 243.60 na na
MAC 280.50 na na 243.60 na na
APR 280.50 na na 243.60 na na
MEI 280.50 na na 243.60 na na
JUN 280.50 na na 243.60 na na
JUL 280.50 na na 243.60 na na
OGO 262.50 na na 243.60 na na
SEP 262.50 na na 243.60 na na
OKT 262.50 na na 243.60 na na
NOV 262.50 na na 243.60 na na
DIS 262.50 na na 243.60 na na

ii) 3.8m Post Spacing 2009 DIS 227.00 238.35 249.70 247.00 259.35 271.70
2010 JAN 197.80 na na 172.20 na na
FEB 197.80 na na 172.20 na na
MAC 197.80 na na 172.20 na na
APR 197.80 na na 172.20 na na
MEI 197.80 na na 172.20 na na
JUN 197.80 na na 172.20 na na
JUL 197.80 na na 172.20 na na
OGO 192.50 na na 172.20 na na
SEP 192.50 na na 172.20 na na
OKT 192.50 na na 172.20 na na
NOV 192.50 na na 172.20 na na
DIS 192.50 na na 172.20 na na
Harga guardrail adalah termasuk kos pengangkutan bagi jarak 30km dari outlet.
The prices for guardrail are inclusive of transportation charges for 30km from the outlets.
na = Tidak diperoleh / Not available
* Lihat lampiran A / See appendix A

- 36 -
Jadual 2 (Samb.) - Harga Unit Purata Bagi Pasir, Batu Baur, Premix, Fabric Reinforcement dan Guardrail
Table 2 (Cont'd.) - Average Unit Prices for Sand, Aggregates, Premix, Fabric Reinforcement and Guardrail

Kawasan*
Region
Perkara Tempoh Sabah Sarawak
Item Period Sabah Sarawak
G H I J K L

(5) Guardrail (Samb.) RM Per Meter


Guardrail (Cont'd.) RM Per Metre

Double Mounted 2009 DIS 409.00 429.45 449.90 422.25 443.36 464.48
i) 1.95m Post Spacing 2010 JAN na na na 342.30 na na
FEB na na na 342.30 na na
MAC na na na 342.30 na na
APR na na na 342.30 na na
MEI na na na 342.30 na na
JUN na na na 342.30 na na
JUL na na na 342.30 na na
OGO na na na 342.30 na na
SEP na na na 342.30 na na
OKT na na na 342.30 na na
NOV na na na 342.30 na na
DIS na na na 342.30 na na

ii) 3.8m Post Spacing 2009 DIS 325.00 341.25 357.50 350.75 368.29 385.83
2010 JAN na na na 270.90 na na
FEB na na na 270.90 na na
MAC na na na 270.90 na na
APR na na na 270.90 na na
MEI na na na 270.90 na na
JUN na na na 270.90 na na
JUL na na na 270.90 na na
OGO na na na 270.90 na na
SEP na na na 270.90 na na
OKT na na na 270.90 na na
NOV na na na 270.90 na na
DIS na na na 270.90 na na

na = Tidak diperoleh / Not available


* Lihat lampiran A / See appendix A

- 37 -
Jadual 3 - Harga Unit Purata Bagi Bitumen, Minyak Bahan Api dan Diesel
Table 3 - Average Unit Prices for Bitumen, Fuel Oil and Diesel

Perkara Tempoh Sabah Sarawak


Item Period Sabah Sarawak

(1) Minyak Bahan Api RM Seliter


Fuel Oil RM Per Litre

Sederhana 2009 DIS 1.78 na


Medium 2010 JAN 1.83 na
FEB 1.76 na
MAC 1.76 na
APR 1.82 na
MEI 1.82 na
JUN 1.66 na
JUL 1.66 na
OGO 1.65R na
SEP 1.61 na
OKT 1.74 na
NOV 1.80 na
DIS 1.85 na

(2) Bitumen Penembusan 80/100 RM Per Tan Metrik


Bitumen 80/100 Penetration RM Per Metric Ton

2009 DIS 1950.00 1980.00


2010 JAN 2000.00 2030.00
FEB 1880.00 2030.00
MAC 1880.00 2030.00
APR 1880.00 2030.00
MEI 1880.00 2030.00
JUN 2090.00R 2075.00
JUL 2090.00 2075.00
OGO 2090.00 2075.00
SEP 2150.00 2180.00
OKT 2150.00 2180.00
NOV 2150.00 2180.00
DIS 2150.00 2180.00

Harga Bitumen Penembusan 80/100 adalah berdasarkan harga purata ex-Sepangar Bay bagi Sabah dan
ex-Kuching bagi Sarawak (pada setiap 1hb).
The Bitumen 80/100 Penetration is based on average ex-Sepangar Bay for Sabah and ex-Kuching for
Sarawak (first day of the month).

na = Tidak diperoleh
= Not available
R = Kemaskini / Revised

- 38 -
Jadual 3 (Samb.) - Harga Unit Purata Bagi Bitumen, Minyak Bahan Api dan Diesel
Table 3 (Cont'd.) - Average Unit Prices for Bitumen, Fuel Oil and Diesel

Perkara Tempoh Sabah Sarawak


Item Period Sabah Sarawak

RM Seliter RM Seliter
(1) Minyak Gas Automotif RM Per Litre RM Per Litre
Automotive Gas Oil Runcit* Sebenar Runcit* Sebenar
Retail Actual Retail Actual

Diesel 2009 JAN 1.700 1.724 1.700 1.716


Diesel FEB 1.700 1.760 1.700 1.752
MAC 1.700 1.843 1.700 1.835
APR 1.700 1.961 1.700 1.953
MEI 1.700 2.052 1.700 2.044
JUN 1.700 2.333 1.700 2.324
JUL 1.700 2.221 1.700 2.213
OGO 1.700 2.388 1.700 2.379
SEP 1.700 2.290 1.700 2.282
OKT 1.700 2.362 1.700 2.354
NOV 1.700 2.441 1.700 2.433
DIS 1.700 2.389 1.700 2.380

2010 JAN 1.700 2.449 1.700 2.441


FEB 1.700 2.416 1.700 2.407
MAC 1.700 2.491 1.700 2.482
APR 1.700 2.565 1.700 2.571
MEI 1.700 2.456 1.700 2.447
JUN 1.700 2.430 1.700 2.420
JUL (1-15 Julai) 1.700 2.373 1.700 2.364
(16-31 Julai) 1.750 2.373 1.750 2.364
OGO 1.750 2.382 1.750 2.373
SEP 1.750 2.352 1.750 2.344
OKT 1.750 2.463 1.750 2.454
NOV 1.750 2.552 1.750 2.544
DIS (1-3 Disember) 1.750 2.684 1.750 2.676
(4-31 Disember) 1.800 2.684 1.800 2.676

Harga diesel diperoleh daripada Kementerian Perdagangan Dalam Negeri, Koperasi dan Kepenggunaan.
Diesel price is obtained from Ministry of Domestic Trade, Co-operatives and Consumerism.

* Harga runcit ialah harga selepas ditolak subsidi kerajaan.


Retail price is the price less government subsidy.

- 39 -
LAMPIRAN
APPENDIX
LAMPIRAN A
APPENDIX A

* Kawasan / Region

Sabah / Sabah

G - Kota Kinabalu
H - Sandakan
I - Tawau

Sarawak / Sarawak

J - Kuching
K - Sibu
L - Miri