BILL OF QUANTITY (KOS PROJEK)

PROJEK PELANDSKAPAN SURAU SMKTM


SEKOLAH MENENGAH KEBANGSAAN TAMAN MEDAN

A LANSKAP LEMBUT

FASA I
Bil Nama Botani Unit Kuantiti Kadar Harga/ Unit Harga
1 Arachis pintoi nos 15 2.50 37.50
2 Cuphea sp. nos 10 2.50 25.00
3 Rheo sp. nos 15 1.50 22.50
4 Blue diamond nos 6 2.50 15.00
5 Philliphines grass ( 2' x 1' ) nos 6 3.00 18.00
6 Lantana sp. nos 20 3.50 70.00
Jumlah 188.00

FASA II
1 Philliphines grass ( 2' x 1' ) nos 20 3.00 60.00
2 Agave sp. nos 2 10.00 20.00
3 Blue diamond nos 12 2.50 30.00
4 Sansieviera (Lidah mak mertua) nos 8 5.00 40.00
5 Lantana sp. nos 10 3.50 35.00
6 Cuphea sp. nos 12 2.50 30.00
Jumlah 215.00

FASA III
1 Madagascariensis (Travellers palm) nos 3 20.00 60.00
2 Pandanus sp. nos 60 2.50 150.00
Jumlah 210.00

B LANSKAP KEJUR

KESELURUHAN
Bil Perkara Unit Kuantiti Kadar Harga/ Unit Harga
1 Arca simen ferro unit 1 300.00 300.00
2 Stepping stone (simen konkrit) unit 25 10.00 250.00
3 Batu kerikil (chipping stone - white) lori 1 120.00 120.00
4 Pasir lori 1 280.00 280.00
5 Tanah atas (top soil) lori 1 280.00 280.00
6 Batu granit (batu taman) kilo 75 1.00 75.00
7 Batu sungai (batu refleksologi) beg 6 36.00 216.00
8 Simen beg 6 12.00 72.00
Jumlah 1,593.00

Jumlah keseluruhan kos pelandskapan Surau SMKTM

A Landskap Lembut (Fasa I + Fasa II + Fasa III) 613.00


B Landskap Kejur 1,593.00

Jumlah 2,206.00