RENCANA ANGGARAN BIAYA PENYELENGGARAAN K3 GEDUNG UPB

I PENYELENGGARAAN KESEHATAN DAN KESELAMATAN KERJA KONSTRUKSI 97,537,500.00


A. PERSIAPAN RK3K TERDIRI ATAS :
1. Pembuatan Manual, Prosedur, Instruksi Kerja set 1.00 350,000.00 350,000.00
2. Pembuatan Kartu Identitas Pekerja Lbr 25.00 5,500.00 137,500.00
B. ALAT PELINDUNGAN KERJA
1. Pembatas Area (Restricted Area) set 1.00 1,000,000.00 1,000,000.00
C. ALAT PELINDUNG DIRI
1. Topi Pelindung (Safty Helmet) bh 15.00 150,000.00 2,250,000.00
2. Pelindung Mata (Goggles, Spectacies) Psg 15.00 150,000.00 2,250,000.00
3. Pelindung Pernapasan dan Mulut (masker) bh 15.00 12,500.00 187,500.00
4. Sarung Tangan (Safety Gloves) Psg 15.00 17,500.00 262,500.00
5. Sepatu Keselamatan (Safety Shoes) Psg 15.00 150,000.00 2,250,000.00
6. Rompi Keselamatan (Safety Vest) bh 15.00 150,000.00 2,250,000.00
7. Sabuk Pengaman panjat (Safety belt) bh 15.00 950,000.00 14,250,000.00
8. Kantong Tidur (Sleeping Bag) bh 5.00 200,000.00 1,000,000.00
9. Tenda (tent) bh 3.00 250,000.00 750,000.00
10. Tali pengaman (Landyard petzi grillon) bh 3.00 4,200,000.00 12,600,000.00
11. Tali penyerap hentakan (Shock energy absorbsing Landyard) bh 3.00 2,000,000.00 6,000,000.00
D. ASURANSI DAN PERIZINAN
1. BPJS Ketenagakerjaan dan Keselamtan Kerja Ls 1.00 19,000,000.00 19,000,000.00
E. PERSONIL K3
1. Petugas k3 OB 4.00 3,000,000.00 12,000,000.00
2. Petugas P3k OB 4.00 2,500,000.00 10,000,000.00
F. FASILITAS SARANA KESEHATAN
1. Peralatan P3K (Kotak P3K, Tandu, Tabung Oksigen dan Obat Luka) Set 4.00 2,500,000.00 10,000,000.00
G. RAMBU - RAMBU
1. Rambu Petunjuk bh 2.00 100,000.00 200,000.00
2. Rambu Larangan bh 4.00 100,000.00 400,000.00
3. Rambu Peringatan bh 2.00 100,000.00 200,000.00
4. Rambu Kewajiban bh 2.00 100,000.00 200,000.00