100%(3)100% menganggap dokumen ini bermanfaat (3 suara)
875 tayangan159 halaman
Automatic transmission 27. Contents Page installation survey Key to sales designation Sectional view Circuit diagram vacuum line routing Special tools Capacities Expendable materials Tightening torques 2 adjusting wire cable for control pressure adjusting control rod adjusting starter lock switch 3 transmission test Checking during test run shift points measuring and adjusting pressure values 4 Repair jobs (transmission installed)
Automatic transmission 27. Contents Page installation survey Key to sales designation Sectional view Circuit diagram vacuum line routing Special tools Capacities Expendable materials Tightening torques 2 adjusting wire cable for control pressure adjusting control rod adjusting starter lock switch 3 transmission test Checking during test run shift points measuring and adjusting pressure values 4 Repair jobs (transmission installed)
Hak Cipta:
Attribution Non-Commercial (BY-NC)
Format Tersedia
Unduh sebagai PDF, TXT atau baca online dari Scribd
Automatic transmission 27. Contents Page installation survey Key to sales designation Sectional view Circuit diagram vacuum line routing Special tools Capacities Expendable materials Tightening torques 2 adjusting wire cable for control pressure adjusting control rod adjusting starter lock switch 3 transmission test Checking during test run shift points measuring and adjusting pressure values 4 Repair jobs (transmission installed)
Hak Cipta:
Attribution Non-Commercial (BY-NC)
Format Tersedia
Unduh sebagai PDF, TXT atau baca online dari Scribd
Automatisches Getriebe 722.3
Typ 461, 463
Bestell-Nr. 6510 5762 02
Printed in GermanyAutomatic transmission 27.51
Contents
Chapter Page
1. General
Installation survey AD 4a
Key to sales designation Al 4a
Sectional view co 2A
Circuit diagram or yar
Vacuum line routing tant
Special tools wt sit
Capacities mt 4.64
Expendable materials, M46
Tightening torques mM 18/1
2. Adjusting work
‘Adjusting wire cable for control pressure Naat
‘Adjusting control rod Plant
‘Adjusting starter lock switch A223
Checking vacuum pressure control valve o2 ant
3. Transmission test
Checking during test run F200 3.4N
Shift points o2 32
Measuring and adjusting pressure values ae an
4 Repair jobs (transmission installed)
Removal and installation of automatic transmission Na 4.41
Removal and installation of centrifugal governor a 42
Removal and installation and disassembly and assembly of rear cover a5 4.3/1
Removal and installation and disassembly and assembly of secondary pump ke 4.41
Removal and installation of kick-down solenoid valve ne 4.5it
Removal and installation of modulating aneroid box P58
Removal and installation of starter lock switch ce azn
Removal and installation and disassembly and assembly of valve body 6s 4a
Removal and installation and disassembly and assembly of lower cover with intermediate plate 7 4.9/1
Check concentricity of flange PT atAutomatic transmission 27.51
Contents
Chapter
5 Repair jobs (transmission removed)
Disassembly and assembly of automatic transmission ce
Removal and installation and disassembly and assembly of front cover with primary pump 13
Disassembly and assembly of clutch K1 m3
Disassembly and assembly of clutch K2 a4
Disassembly, assembly and measuring gearset cis
6 Shift mechanism
16
Removal and installation of floor shift
Disassembly and assembly of floor shift ie
Page
Ba
5.24
5.3/1
5a
5.5/1
eat
621