Anda di halaman 1dari 45

DAFTAR ANALISA HARGA SATUAN PEKERJAAN

### TAHUN 2020

A. HARGA PEKERJAAN BONGKARAN DAN PERSIAPAN


A.1 Pembongkaran 1 m3 Beton Bertulang (KHUSUS BETON STRUKTUR)
HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 6.667 94,500.00 630,031.50
Mandor L.17 OH 0.330 120,000.00 39,600.00

D. Jumlah (A + B + C) 669,631.50
E. Overhead & Profit -
F. Harga Satuan Pekerjaan (D+E) 669,631.50

A.2 Pembongkaran 1 m2 Paving lama


HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.100 94,500.00 9,450.00
Mandor L.17 OH 0.010 120,000.00 1,200.00
10,650.00
D. Jumlah (A + B + C) 10,650.00
E. Overhead & Profit
F. Harga Satuan Pekerjaan (D+E) 10,650.00

A.3 Pengukuran dan Pasang 1 m' Bouwplank


HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.1000 94,500.00 9,450.00
Tukang kayu L.04 OH 0.1000 97,000.00 9,700.00
Kepala Tukang L.05 OH 0.0100 100,000.00 1,000.00
Mandor L.17 OH 0.0050 120,000.00 600.00
20,750.00
B. BAHAN
Kayu seseh m3 0.012 2,150,000.000 25,800.00
Paku 2-3 Kg 0.020 18,000.00 360.00
Papan begesting 2/20 m3 0.007 1,750,000.00 12,250.00
38,410.00
C. PERALATAN -
JUMLAH HARGA ALAT -

D. Jumlah (A + B + C) 59,160.00
E. Overhead & Profit 0% x D -
F. Harga Satuan Pekerjaan (D+E) 59,160.00

Page 1
B HARGA SATUAN PEKERJAAN TANAH
B.9 Pemadatan 1 m3 tanah urug
HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.3000 94,500.00 28,350.00
Mandor L.17 OH 0.0100 120,000.00 1,200.00
29,550.00
B. PERALATAN
LS

C. BAHAN

D. Jumlah (A + B + C) 29,550.00
E. Overhead & Profit
F. Harga Satuan Pekerjaan (D+E) 29,550.00

B.10 Pengurugan 1 m3 Dengan Pasir Urug


HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.3000 94,500.00 28,350.00
Mandor L.17 OH 0.0100 120,000.00 1,200.00
29,550.00
B. BAHAN
Pasir Urug m3 1.200 125,000.000 150,000.00
150,000.00
C. PERALATAN

D. Jumlah (A + B + C) 179,550.00
E. Overhead & Profit
F. Harga Satuan Pekerjaan (D+E) 179,550.00

B.11 1 m3 Membuang Bongkaran Paving Keluar Lokasi


HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.3300 94,500.00 31,185.00
Mandor L.17 OH 0.0100 120,000.00 1,200.00
32,385.00
B. BAHAN

C. PERALATAN

D. Jumlah (A + B + C) 32,385.00
E. Overhead & Profit
F. Harga Satuan Pekerjaan (D+E) 32,385.00

Page 2
E HARGA SATUAN PEKERJAAN PLESTERAN, ACIAN DAN PASANGAN

E.4 Pemasangan 1 m² Plesteran 1 SP : 5 PP tebal 15 mm


HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.3000 94,500.00 28,350.00
Tukang batu L.02 OH 0.1500 97,000.00 14,550.00
Kepala Tukang L.03 OH 0.0150 100,000.00 1,500.00
Mandor L.17 OH 0.0150 120,000.00 1,800.00
46,200.00
B. BAHAN
1. Semen Portland kg 5.1840 1,200.00 6,220.80
2. Pasir Pasang m³ 0.0260 137,500.00 3,575.00
9,795.80
C. PERALATAN

D. Jumlah (A + B + C) 55,995.80
E. Overhead & Profit
F. Harga Satuan Pekerjaan (D+E) 55,995.80

E.23 Pemasangan 1 m2 paving stone 20x20x6 cm (alur warna kuning)


HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.5000 94,500.00 47,250.00
Tukang Batu L.02 OH 0.2500 97,000.00 24,250.00
Kepala Tukang L.03 OH 0.0250 100,000.00 2,500.00
Mandor L.17 OH 0.0250 120,000.00 3,000.00
77,000.00
B. BAHAN
Paving Blok 20 x 20 x 6 cm (alur warna kuning) m2 1.000 63,000.00 63,000.00
Pasir urug m3 0.100 125,000.00 12,500.00
75,500.00
C. PERALATAN

D. Jumlah (A + B + C) 152,500.00
E. Overhead & Profit
F. Harga Satuan Pekerjaan (D+E) 152,500.00

E.23 Pemasangan 1 m2 paving stone 20x20x8 cm K-400 (polos)


HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.5000 94,500.00 47,250.00
Tukang Batu L.02 OH 0.2500 97,000.00 24,250.00
Kepala Tukang L.03 OH 0.0250 100,000.00 2,500.00
Mandor L.17 OH 0.0250 120,000.00 3,000.00
77,000.00
B. BAHAN
Paving Blok 20 x 20 x 8 cm K 400 (polos) m2 1.000 72,500.00 72,500.00
Pasir urug m3 0.100 125,000.00 12,500.00
85,000.00
C. PERALATAN

D. Jumlah (A + B + C) 162,000.00
E. Overhead & Profit 0% x D -
F. Harga Satuan Pekerjaan (D+E) 162,000.00

Page 3
L PEKERJAAN PENGECATAN
L.1 Pengecatan 1 M² tembok baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup setara vinilex)
HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.0200 94,500.00 1,890.00
Tukang cat L.06 OH 0.0630 97,000.00 6,111.00
Kepala tukang L.07 OH 0.0063 100,000.00 630.00
Mandor L.17 OH 0.0030 120,000.00 360.00
8,991.00
B. BAHAN
Plamuur Kg 0.1000 32,000.00 3,200.00
Cat dasar Kg 0.1000 26,000.00 2,600.00
Cat penutup setara vinilex Kg 0.2600 26,500.00 6,890.00
12,690.00
C. PERALATAN

D. Jumlah (A + B + C) 21,681.00
E. Overhead & Profit 0% x D -
F. Harga Satuan Pekerjaan (D+E) 21,681.00

L.2 Pengecatan 1 M² tembok lama (1 x cat dasar, 2 x cat penutup)


HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.028 94,500.00 2,646.00
Tukang cat L.06 OH 0.042 97,000.00 4,074.00
Kepala tukang L.07 OH 0.0042 100,000.00 420.00
Mandor L.17 OH 0.003 120,000.00 360.00
7,500.00
B. BAHAN
Cat dasar Kg 0.120 26,000.00 3,120.00
Cat penutup setara vinilex Kg 0.180 26,500.00 4,770.00
JUMLAH HARGA BAHAN 7,890.00
C. PERALATAN
JUMLAH HARGA ALAT

D. Jumlah (A + B + C) 15,390.00
E. Overhead & Profit 0% x D -
F. Harga Satuan Pekerjaan (D+E) 15,390.00

L.7 1 m2 Pengecatan Kanstin


HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.1500 94,500.00 14,175.00
Tukang cat L.06 OH 0.0300 97,000.00 2,910.00
Kepala tukang L.07 OH 0.0030 100,000.00 300.00
Mandor L.17 OH 0.0030 120,000.00 360.00
17,745.00
B. BAHAN
cat kayu kg 0.2840 67,000.00 19,028.00
Minyak Cat kg 0.0710 21,000.00 1,491.00
20,519.00
C. PERALATAN

D. Jumlah (A + B + C) 38,264.00
E. Overhead & Profit 0% x D -
F. Harga Satuan Pekerjaan (D+E) 38,264.00
N. PEKERJAAN LAIN-LAIN
N.1 Pemasangan 1 m² Ubin pemandu 30 x 30 warna kuning
HARGA SAT. JML. HARGA
NO. URAIAN KODE SATUAN KOEFISIEN
(Rp.) (Rp.)

A. TENAGA
Pekerja L.01 OH 0.2700 94,500.00 25,515.00
Tukang batu L.08 OH 0.1350 97,000.00 13,095.00
Kepala Tukang L.18 OH 0.0140 100,000.00 1,400.00
Mandor L.17 OH 0.0140 120,000.00 1,680.00
41,690.00
B. BAHAN
Ubin Pemandu 30x30 Warna Kuning bh 12.000 20,000.00 240,000.00
Semen Portland Kg 10.400 1,200.00 12,480.00
Pasir pasang M³ 0.045 137,500.00 6,187.50
Semen warna Kg 1.620 9,500.00 15,390.00
Page 4 274,057.50
DAFTAR HARGA SATUAN BAHAN DAN UPAH
TAHUN 2020

NO URAIAN SATUAN HARGA SATUAN Keterangan


1 2 3 5
A UPAH
1 Pekerja OH Rp 94,500.00
2 Mandor OH Rp 120,000.00
3 Kepala Tukang Kayu OH Rp 100,000.00
4 Kepala Tukang Batu OH Rp 100,000.00
5 Kepala Tukang Besi OH Rp 100,000.00
6 Kepala Tukang Cat OH Rp 100,000.00
7 Kepala Tukang Style Bali OH Rp 250,000.00
8 Kepala Tukang Pipa OH Rp 100,000.00
9 Kepala Tukang Listrik OH Rp 100,000.00
10 Kepala Tukang Paras OH Rp 150,000.00
11 Tukang Kayu OH Rp 97,000.00
12 Tukang Batu OH Rp 97,000.00
13 Tukang Besi OH Rp 97,000.00
14 Tukang Cat OH Rp 97,000.00
15 Tukang Politur OH Rp 97,000.00
16 Tukang Style Bali OH Rp 150,000.00
17 Tukang Pipa OH Rp 97,000.00
18 Tukang Listrik OH Rp 97,000.00
20 Tukang Ukir Kayu OH Rp 110,000.00
21 Tukang Ukir Paras OH Rp 110,000.00
22 Tukang masak aspal OH Rp 98,000.00
23 Pengayah Tukang Bangunan OH Rp 94,500.00
24 Masinis OH Rp 100,000.00
25 Kernet OH Rp 94,500.00
26 Sopir OH Rp 150,000.00
27 Tukang Style Bali
28 - Atap Alang-Alang Hr Rp 120,000.00
29 - Bata Gosok Dua Muka m2 Rp 350,000.00
30 - Batu Paras Diukir m2 Rp 350,000.00
31 - Batu Paras Siap Diukir m2 Rp 350,000.00

B BAHAN PASANGAN
1 Batu Pecah Besar m3 Rp 164,000.00
2 Batu Pecah 5 - 7 cm m3 Rp 150,000.00
3 Batu Pecah 2 - 3 cm m3 Rp 165,000.00
4 Batu Pecah 3 - 4 / 3-5 cm m3 Rp 172,000.00
5 Batu Pecah 1 - 2 cm m3 Rp 182,000.00
6 Batu Pecah 10-15 cm m3 Rp 148,000.00
7 Batu Pecah 0,5 - 1 cm m3 Rp 190,000.00
8 Batu Seplit Halus ( 0,5 - 1 ) cm m3 Rp 195,000.00
9 Batu Seplit Jagung (1 - 2) cm/ kasar m3 Rp 192,000.00
10 Pasir Batu (Sirtu) m3 Rp 135,000.00 ###
11 Batu 5-7 cm m3 Rp 150,000.00
12 Batu 2-3 cm m3 Rp 165,000.00
13 Batu 3-5 cm m3 Rp 172,000.00
14 Batu 0,5-1 cm m3 Rp 182,000.00
15 Batu 1-2 cm m3 Rp 182,000.00
16 Batu Kali m3 Rp 128,000.00 ###
17 Batu Besar W 50 Kg m3 Rp 182,000.00
18 Batu Besar W 500 Kg m3 Rp 172,000.00
19 Batu Besar W 1000 Kg m3 Rp 165,000.00
20 Batu Besar 15/ 20 m3 Rp 150,000.00

C KERIKIL (KORAL)
1 Kerikil Biasa/ timbun m3 Rp 140,250.00 Rp 103.89 ###
2 Kerikil Beton m3 Rp 143,500.00 Rp 106.30 ###
3 Kerikil Halus m3 Rp 152,500.00 ###
4 Kerikil Sungai (tidak disaring) m3 Rp 138,000.00 ###
Page 5
Page 6
D PASIR
1 Pasir Urug m3 Rp 125,000.00 ###
2 Pasir Beton m3 Rp 125,000.00 ###
3 Pasir Pasang m3 Rp 137,500.00 ###

E TANAH
1 Tanah Urug m3 Rp 62,500.00

F BATU BATA
1 Bata Gosok klas I bj Rp 2,000.00
2 Bata Gosok klas II bj Rp 1,700.00
3 Bata Pasang klas I bj Rp 1,000.00
4 Bata Pasang klas II bj Rp 900.00
5 Batu Lahar Merah Singaraja m3 Rp 650,000.00
6 Batu Pipih Singaraja m3 Rp 850,000.00
7 Loster Terawang PC bj Rp 25,000.00
8 Roster Terawang Keramik 30 x 30 bj Rp 35,000.00

G PARAS/PADAS
1 Paras Malam 50 x 20 x 12 cm bj Rp 19,000.00
2 Paras Ukir Selekarang 30x15x3cm bj Rp 16,000.00

H PORTLAND CEMENT
1 Semen Gresik ( 40 kg ) zak Rp 49,000.00 Rp 1,225.00
2 Semen Tiga Roda (50 kg) zak Rp 60,000.00 Rp 1,200.00
3 Semen Bosowa (50 kg) zak Rp 57,000.00 Rp 1,140.00
4 Semen Tiga Roda Putih (40 kg) zak Rp 65,000.00
5 Semen Warna kg Rp 9,500.00

I BAHAN ATAP
1 Genteng biasa bj Rp 1,500.00
2 Bubungan genteng biasa bj Rp 5,500.00
3 Genteng Kecil bj Rp 2,000.00
4 Bubungan genteng kecil bj Rp 6,000.00
5 Genteng Kodok Nglayur bj Rp 4,500.00
6 Bubungan Genteng Kodok bj Rp 9,000.00
7 Genteng Plentong pres jawa bj Rp 4,000.00
8 Bubungan genteng plentong bj Rp 10,000.00
9 Genteng Goodyear bj Rp 5,700.00
10 Bubungan Goodyear bj Rp 15,000.00
11 Genteng Kaca 3 mm bj Rp 9,000.00
12 Ijuk Kg Rp 2,500.00
13 Alang-alang Lbr Rp 120,000.00
14 Tali Pengikat Gulung Rp 15,000.00
15 Zincalume / spandeck 0,25 mm m2 Rp 45,000.00
16 Zincalume 0,25 mm/Trimdeck m2 Rp 38,000.00
17 Reng Zincalume (6m) btg Rp 18,000.00
18 Rangka Atap Baja Ringan Profil C 0,75x0,75 (6m) btg Rp 83,000.00
19 Rangka Atap Baja Ringan Profil C 0,65 btg Rp 75,000.00
20 Rangka Atap Baja Ringan Profil UK 0,65 btg Rp 105,000.00
21 Rangka Atap Baja Ringan Profil UK 0,75x0,75 btg Rp 120,000.00

J SENG
1 Gelombang BJLS 0,18 mm lbr Rp 75,000.00
2 Gelombang BJLS 0,20 mm lbr Rp 96,000.00
3 Seng Talang 30 cm m Rp 30,000.00

K ASBES PC (DJABESMEN)
1 Asbes Gel. 1,8 m` x 1,05 m`/4 mm lbr Rp 65,000.00

L BAHAN KAYU
1 Kayu Jati Papan m3 Rp 15,500,000.00
2 Kayu Jati Balok m3 Rp 14,000,000.00
3 Kayu Jati Bali Papan m3 Rp 9,000,000.00
4 Kayu Jati Bali Balok m3 Rp 8,500,000.00
Page 7
5 Kayu Kamper Papan 3/20 m3 Rp 5,700,000.00
6 Kayu Kamper Balok 8/12 m3 Rp 5,500,000.00

Page 8
7 Kayu Kamper Balok 6/12 m3 Rp 5,500,000.00
8 Kayu Kamper Usuk 4/6 m3 Rp 5,500,000.00
9 Kayu Kamper Usuk 5/7 m3 Rp 5,500,000.00
10 Kayu Kamper Reng m3 Rp 5,500,000.00
11 Kayu Meranti Papan m3 Rp 4,000,000.00
12 Kayu Meranti Balok 8/12 m3 Rp 3,500,000.00
13 Kayu Meranti Balok 6/12 m3 Rp 3,500,000.00
14 Kayu Meranti Usuk 5/7 m3 Rp 3,500,000.00
15 Kayu Meranti Usuk 4/6 m3 Rp 3,500,000.00
16 Kayu Meranti Reng m3 Rp 3,500,000.00
17 Kayu Kruing Papan m3 Rp 6,100,000.00
18 Kayu Kruing Balok 8/12 m3 Rp 5,000,000.00
19 Kayu Kruing Balok 6/12 m3 Rp 5,000,000.00
20 Kayu Kruing Usuk 5/7 m3 Rp 5,000,000.00
21 Kayu Kruing Usuk 4/6 m3 Rp 5,000,000.00
22 Reng Kruing m3 Rp 130,000.00
23 Seseh Balok mtr Rp 2,150,000.00
24 Papan begesting Lbr Rp 1,750,000.00
25 Balok bingkirai m3 Rp 3,500,000.00
26 Papan bingkirai m3 Rp 3,000,000.00
27 Plywood 9 mm lbr Rp 120,000.00
28 Seseh Dolken mtr Rp 170,000.00
29 Multipleks
30 - 6 mm lbr Rp 55,000.00
31 - 9 mm lbr Rp 110,000.00
32 - 12 mm lbr Rp 120,000.00
33 - 18 mm lbr Rp 135,000.00
34 Dolken kayu 8-10/4m btg Rp 55,000.00
35 List Kayu 2/4 - 4 m btg Rp 20,000.00
36 Kayu profil btg Rp 35,000.00
37 Kayu Perancah m3 Rp 2,150,000.00

M BAHAN BAMBU
1 Bambu Besar btg Rp 10,000.00
2 Bambu Sedang btg Rp 9,000.00
3 Bambu Kecil btg Rp 8,000.00
4 Gedeg Kelas I m2 Rp 15,000.00
5 Gedeg Kelas II m2 Rp 13,000.00

N BETON CETAK
1 Buis Beton 50/1 m` bj Rp 250,000.00
2 Buis Beton 30/1 m` bj Rp 230,000.00
3 Buis Beton 25/1 m` bj Rp 215,000.00
4 Buis Beton 20/1 m` bj Rp 200,000.00
5 Buis Beton 50/0,75 m` bj Rp 190,000.00
6 Buis Beton 30/0,75 m` bj Rp 185,000.00
7 Buis Beton 25/0,75 m` bj Rp 175,000.00
8 Buis Beton 20/0,75 m` bj Rp 170,000.00
9 Buis Beton dia 1 m, H = 0,5 m, t = 0,05 m bj Rp 250,000.00
10 Batako Cetak Lubang KW I bj Rp 2,000.00
11 Paving Blok 20 x 20 x 6 cm (alur warna kuning) m2 Rp 63,000.00
12 Paving Blok 20 x 20 x 8 cm K 400 (polos) m2 Rp 72,500.00

O KERAMIK
1 Keramik KW I 20/25 cm m2 Rp 2,075.00
2 Keramik KW I 20/20 cm m2 Rp 1,680.00
3 Keramik KW I 30/30 cm putih polos m2 Rp 50,000.00
4 Keramik KW I 40/40 cm putih polos m2 Rp 4,750.00
5 Ubin Pemandu 30/30 warna kuning bh Rp 20,000.00

P BAHAN BESI
1 Besi Beton Polos
- besi Ø 4 mm ljr / btg Rp 27,000.00

Page 9
- besi Ø 6 mm ljr / btg Rp 38,000.00
- besi Ø 8 mm ljr / btg Rp 55,000.00

Page 10
- besi Ø 10 mm ljr / btg Rp 65,000.00
- besi Ø 12 mm ljr / btg Rp 90,000.00
- besi Ø 16 mm ljr / btg Rp 108,000.00
- besi Ø 18 mm ljr / btg Rp 132,000.00
- besi Ø 22 mm ljr / btg Rp 146,000.00
- besi Ø 24 mm ljr / btg Rp 189,000.00
2 Besi Beton ulir
- besi D 13 mm ljr Rp 95,000.00
- besi D 16 mm ljr Rp 132,000.00
- besi D 19 mm ljr Rp 144,000.00

Q KAWAT
1 Kawat Ikat Beton kg Rp 20,000.00
2 Kawat nyamuk 1 x 2 m m2 Rp 35,000.00
3 Kawat Harmonika 5 x 5 cm m2 Rp 37,000.00
4 Kawat Harmonika 4 x 4 cm m2 Rp 28,000.00
5 Kawat Harmonika 3 x 3 cm m2 Rp 25,000.00
6 Kawat 4 mm kg Rp 26,000.00
7 Besi Strip kg Rp 8,700.00
8 Besi Profil WF kg Rp 11,500.00

R BAHAN PLAFON
1 Eternit Klas I (1/1) M lbr Rp 65,000.00
2 Eternit Klas II (1/1) M lbr Rp 55,000.00
3 Triplek 3 mm lbr Rp 45,000.00
4 Teak Wood 4 mm lbr Rp 65,000.00
5 Teak Wood 3 mm lbr Rp 60,000.00
6 Ceilingteak lbr Rp 21,000.00
7 Aluminium Foil (Pj=60, l=100) glg Rp 43,000.00
8 Kalsiboard lbr Rp 60,000.00
9 Gypsum lbr Rp 52,000.00
10 List Gypsum m' Rp 5,454.55

S BAHAN PIPA
1 Pipa Galvanis 6 m'
- ø 2" btg (6 m) Rp 314,160.00
- ø 1,5" btg (6 m) Rp 230,160.00
- ø 1,25" btg (6 m) Rp 151,520.00
- ø 1" btg (6 m) Rp 112,680.00
- ø 0,75" btg Rp 43,750.00
- ø 0,5" btg Rp 37,000.00
2 Pipa PVC AW 4 m'
- ø 4" btg Rp 380,000.00
- ø 3" btg Rp 270,000.00
- ø 2,5" btg Rp 110,000.00
- ø 2" btg Rp 90,000.00
- ø 1,5" btg Rp 60,000.00
- ø 1" btg (6 m) Rp 45,000.00
- ø 0,75" btg (6 m) Rp 35,000.00
- ø 0,5" btg (6 m) Rp 23,000.00
3 Pipa PVC C 4 m'
- ø 4" btg Rp 150,000.00
4 Pipa PVC D 4 m'
- ø 4" btg Rp 300,000.00
- ø 3" btg Rp 260,000.00
- ø 2,5" btg Rp 180,000.00
- ø 2" btg Rp 100,000.00
- ø 1,5" btg Rp 60,000.00
- ø 1" btg Rp 45,000.00
- ø 0,75" btg Rp 32,000.00
- ø 0,5" btg Rp 23,000.00
5 Pipa listrik btg Rp 30,000.00
6 Pipa Paralon 5/8 " btg Rp 120,000.00

Page 11
Page 12
T BAHAN FINISHING
1 Amplas lbr Rp 9,000.00
2 Minyak Cat ltr Rp 12,500.00
3 Meni kayu kg Rp 21,000.00
4 Plamir kayu kg Rp 35,000.00
5 Cat Dasar Kayu kg Rp 62,500.00
6 Cat Kayu kg Rp 67,000.00
7 Plamir Tembok kg Rp 32,000.00
8 Cat Dasar Tembok kg Rp 26,000.00
9 Cat Tembok kg Rp 26,500.00
10 Meni Besi kg Rp 27,000.00
11 Dempul kg Rp 20,000.00
12 Cat Besi kg Rp 25,000.00
13 Politur ltr Rp 65,000.00
14 Politur jadi ( Ultran ) ltr Rp 82,500.00
15 Teak Oil ltr Rp 17,500.00
16 Spritus ltr Rp 11,000.00
17 Sirlak kg Rp 20,000.00
18 Oker kg Rp 19,800.00
19 Lem Kayu kg Rp 12,500.00
20 Impra kg Rp 23,000.00

U BAHAN KACA
1 Kaca Bening 5 mm m2 Rp 98,000.00
2 Kaca Bening 3 mm m2 Rp 90,000.00
3 Kaca Ray-Ban 5 mm m2 Rp 130,000.00
4 Nako + Tralis m2 Rp 98,000.00

V ALAT PENGUNCI
1 Kunci 2 Slaag bh Rp 145,000.00
2 Kunci 1 Slaag bh Rp 140,000.00
3 Kunci KM/ WC bh Rp 125,000.00
4 Kunci Gembok bh Rp 55,000.00
5 Grendel bh Rp 15,000.00

W ALAT PENGGANTUNG
1 Kait Angin psg Rp 25,000.00
2 Engsel kupu-kupu psg Rp 15,000.00
3 Engsel Nilon psg Rp 12,500.00
4 Espanolet bh Rp 175,000.00

X BAHAN SANITAIR
1 Washtafel bh Rp 2,800,000.00
2 Urinoir bh Rp 4,500,000.00
3 Closet Jongkok bh Rp 1,550,000.00
4 Closet Duduk bh Rp 2,750,000.00
5 Bak Mandi Fiber bh Rp 325,000.00
6 Bak Mandi Keramik bh Rp 700,000.00
7 Floordrain bh Rp 30,000.00
8 Shower bh Rp 171,000.00
9 Kran Air bh Rp 55,000.00
10 Jet Washer bh Rp 110,000.00
10 Pompa air 150 watt bh Rp 1,760,000.00
11 Pompa air 250 watt bh Rp 1,850,000.00
12 Selang Air 1/2' m Rp 6,000.00
13 Selang Air 3/4' m Rp 8,000.00

Page 13
Y BAHAN PAKU
1 Paku Lis kg Rp 18,000.00
2 Paku Reng kg Rp 18,500.00
3 Paku Usuk kg Rp 19,000.00
4 Paku Seng kg Rp 35,000.00
5 Paku Sekrup 1/2" ktk Rp 250,000.00
6 Paku Sekrup 2" ktk Rp 350,000.00
7 Paku gypsum kg Rp 45,000.00
8 Paku beton 5 cm kg Rp 17,000.00
9 Paku beton 3" ktk Rp 13,500.00
10 Paku pancing ktk Rp 23,000.00

Z LAIN-LAIN
1 Aspal
- Aspal Emulsi kg Rp 7,000.00
- Aspal Cutback kg Rp 6,000.00
- Aspal Bitumen kg Rp 5,000.00
- Aspal Curah ltr Rp 8,000.00
2 Solar ltr Rp 5,150.00
3 Oli Bh Rp 38,000.00
4 Sikat Ijuk buah Rp 25,000.00
5 Aluminium Anti Gores/Gloos 3" m' Rp 65,000.00
6 Pintu Aluminium Anti Gores/Gloss Kaca 5mm (swing) unit Rp 3,000,000.00
7 Pintu Aluminium Anti Gores/Gloss Kaca 5mm (slide) unit Rp 3,200,000.00
8 Pintu Aluminium Anti Gores/Gloss Kaca 5mm (spindri) unit Rp 3,500,000.00
9 Pintu Full Kaca (Floring Dorma Tempert 12 mm unit Rp 6,500,000.00
10 Pintu Full Kaca (Floring Dorma Tempert 10 mm unit Rp 6,200,000.00
11 Jendela UK Standart 120 x 60 MAX unit Rp 2,250,000.00
12 Alumnium Kulit Jeruk lbr Rp 85,000.00

AA BAHAN LISTRIK
1 NYY 3 x 2.5 mm2 M' Rp 11,500.00
2 NYM 3 x 2.5 mm2 M' Rp 12,500.00
3 Conduit high impact M' Rp 15,000.00
4 Socket Bh Rp 8,000.00
5 Cleam + Fisher ulir Bh Rp 2,000.00
6 Saklar Tungal bh Rp 23,000.00
7 Saklar Ganda bh Rp 25,000.00
8 Stop Kontak bh Rp 17,800.00
9 Bok MK bh Rp 280,000.00
10 Fitting Lampu bh Rp 15,000.00
11 Pas. Lampu SL 18 watt Bh Rp 78,000.00
12 Pas. Lampu SL 14 watt Bh Rp 70,000.00

Singaraja, 30 Maret 2020


CV.LESTARI

KETUT RANGGA
Direktur

Page 14
BILL OF QUANTITY
KEGIATAN : PENGEMBANGAN OBJEK PARIWISATA UNGGULAN
PEKERJAAN : PEKERJAAN PEMBUATAN TEMPAT PARKIR DI DTW EKS. PELABUHAN BULELENG
LOKASI : EKS. PELABUHAN BULELENG KELURAHAN KAMPUNG BUGIS
TAHUN ANGGARAN : 2020

HARGA JUMLAH
NO. URAIAN PEKERJAAN VOLUME SATUAN HARGA
( Rp. ) ( Rp. )
1 2 3 4 5

I PEKERJAAN PERSIAPAN
1 Pek. Pembuatan papan nama kegiatan 1.00 ls 150,000.00 150,000.00
JUMLAH 150,000.00
II PEKERJAAN (K3) KESEHATAN DAN KESELAMATAN KERJA
1 Pengadaan kartu identitas/Name Tag 15.00 bh 3,000.00 45,000.00
2 Helm Pelindung (Safety Helmet) 15.00 bh 53,500.00 802,500.00
3 Rompi Keselamatan 15.00 bh 23,000.00 345,000.00
4 Masker Pelindung 20.00 bks 20,000.00 400,000.00
5 Spanduk/Baner Keselamatan Kerja 5.00 m2 120,000.00 600,000.00
6 Box/Kotak PPPK 1.00 unit 300,000.00 300,000.00
JUMLAH 2,492,500.00
III PEKERJAAN BONGKARAN DAN PENGANGKUTAN
1 Pek. Bongkaran paving lama 2246.68 m2 10,650.00 23,927,142.00
2 Pek. Pengangkutan bongkaran paving ke luar lokasi 263.20 m3 32,385.00 8,523,732.00
JUMLAH 32,450,874.00
IV PEKERJAAN URUGAN
1 Pek. Urugan pasir untuk perataan 68.70 m3 179,550.00 12,335,085.00
JUMLAH 12,335,085.00
V PEKERJAAN PASANGAN
1 Pas. Paving 20 X 20 cm tebal 8 cm (K 400) polos 2120.50 m2 162,000.00 343,521,000.00
2 Pas. Paving 20 x 20 cm tebal 6 cm (alur warna kuning) 115.74 m2 152,500.00 17,650,350.00
JUMLAH 361,171,350.00
VI PEKERJAAN BETON
1 Pek. Beton pengunci (Beton cor 1 : 2 : 3) 5.31 m3 827,986.10 4,396,606.19
JUMLAH 4,396,606.19
VII PEKERJAAN FINISHING
1 Pek. Pengecatan kanstin 294.43 m3 38,264.00 11,266,069.52
JUMLAH 11,266,069.52

TOTAL 424,262,484.71

Singaraja, 30 Maret 2020


CV. LESTARI

KETUT RANGGA
Direktur
BILL OF QUANTITY (BOQ)

KEGIATAN : PENGEMBANGAN OBJEK PARIWISATA UNGGULAN


PEKERJAAN : PEKERJAAN PEMBUATAN TEMPAT PARKIR DI DTW EKS. PELABUHAN BULELENG
LOKASI : EKS. PELABUHAN BULELENG KELURAHAN KAMPUNG BUGIS
TAHUN ANGGARAN : 2020

NO URAIAN PEKERJAAN HARGA


(Rp)

I PEKERJAAN PERSIAPAN 150,000.00


II PEKERJAAN (K3) KESEHATAN DAN KESELAMATAN KERJA 2,492,500.00
III PEKERJAAN BONGKARAN DAN PENGANGKUTAN 32,450,874.00
IV PEKERJAAN URUGAN 12,335,085.00
V PEKERJAAN PASANGAN 361,171,350.00
VI PEKERJAAN BETON 4,396,606.19
VII PEKERJAAN FINISHING 11,266,069.52

REAL COST 424,262,484.71


PPN 10% 42,426,248.47
TOTAL 466,688,733.18
Dibulatkan 466,688,000.00

Terbilang :Empat Ratus Lima Puluh Tiga Juta Lima Ratus Delapan Puluh Delapan Ribu Rupiah

Singaraja, 30 Maret 2020


CV. LESTARI

KETUT RANGGA
Direktur
JADWAL PELAKSANAAN KURVA " S
KEGIATAN : PENGEMBANGAN OBJEK PARIWISATA UNGGULAN
PEKERJAAN : PEKERJAAN PEMBUATAN TEMPAT PARKIR DI DTW
LOKASI : EKS. PELABUHAN BULELENG KELURAHAN KAMP
TAHUN ANGGARAN : 2020

NO.

I PEKERJAAN PERSIAPAN
1 Pek. Pembuatan papan nama kegiatan

II PEKERJAAN (K3) KESEHATAN DAN KESELAMATAN KERJA


1 Pengadaan kartu identitas/Name Tag
2 Helm Pelindung (Safety Helmet)
3 Rompi Keselamatan
4 Masker Pelindung
5 Spanduk/Baner Keselamatan Kerja
6 Box/Kotak PPPK

III PEKERJAAN BONGKARAN DAN PENGANGKUTAN


1 Pek. Bongkaran paving lama
2 Pek. Pengangkutan bongkaran paving ke luar lokasi

IV PEKERJAAN URUGAN
1 Pek. Urugan pasir untuk perataan

V PEKERJAAN PASANGAN
1 Pas. Paving 20 X 20 cm tebal 8 cm (K 400) polos
2 Pas. Paving 20 x 20 cm tebal 6 cm (alur warna kuning)

VI PEKERJAAN BETON
1 Pek. Beton pengunci (Beton cor 1 : 2 : 3)

VII PEKERJAAN FINISHING


1 Pek. Pengecatan kanstin

Jumlah Nilai Pekerjaan


Kemajuan Pekerjaan %
Kemajuan Pekerjaan Kumulatif %
ISATA UNGGULAN
AT PARKIR DI DTW EKS. PELABUHAN BULELENG
ELURAHAN KAMPUNG BUGIS

MASA PELAKSANAAN SELA


VOLUME SATUAN BOBOT BULAN I BULAN II
Minggu Minggu Minggu Minggu Minggu Minggu

7 7 7 7 7 7
3 4 5 1 2 3 4 5 6

1.00 ls 0.035 0.035

15.00 bh 0.011 0.001 0.001 0.001 0.001 0.001 0.001


15.00 bh 0.189 0.011 0.011 0.011 0.011 0.011 0.011
15.00 bh 0.081 0.005 0.005 0.005 0.005 0.005 0.005
20.00 bks 0.094 0.005 0.005 0.005 0.005 0.005 0.005
5.00 m2 0.141 0.141
1.00 unit 0.071 0.071

2,246.68 m2 5.640 1.410 1.410 1.410 1.410


263.20 m3 2.009 0.502 0.502 0.502 0.502

68.70 m3 2.907 1.454 1.454

2,120.50 m2 80.969 6.747


115.74 m2 4.160

5.31 m3 1.036

294.43 m3 2.66

100.00 1.68 1.93 1.93 1.93 1.98 8.22


1.68 3.61 5.54 7.48 9.45 17.68
SA PELAKSANAAN SELAMA 120 (DUA RATU EMPAT PULUH ) HARI KALENDER
BULAN II BULAN III BULAN 1V
Minggu Minggu Minggu Minggu Minggu Minggu Minggu Minggu Minggu Minggu

7 7 7 7 7 7 7 7 7 7
7 8 9 10 11 12 13 14 15 16

0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011

0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005
0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005

6.747 6.747 6.747 6.747 6.747 6.747 6.747 6.747 6.747 6.747
1.040 1.040 1.040 1.040

0.345 0.345 0.345

0.443 0.443 0.443 0.443 0.443 0.443

7.81 7.81 7.81 8.15 7.56 7.56 7.21 7.21 7.21 7.21
25.48 33.29 41.10 49.25 56.81 64.37 71.58 78.79 86.00 93.21
BULAN VI
Minggu Minggu PROSENTASE KETERANGAN
7 1
17 18

100

90
0.001 0.001
180 ( SERATUS DELAPAN PULUH HARI ) HARI KALENDER

0.011 0.011

0.005 0.005 80
0.005 0.005

70
MASA PEMELIHARAAN

60

50

40

30
6.747

20

10

6.77 0.02 -
99.98 100.00

Singaraja, 30 Maret 2020


CV. LESTARI

KETUT RANGGA
Direktur
MOBILISASI DAN DEMOBILISASI
KEGIATAN : PENGEMBANGAN OBJEK PARIWISATA UNGGULAN
PEKERJAAN : PEKERJAAN PEMBUATAN TEMPAT PARKIR DI DTW
LOKASI : EKS. PELABUHAN BULELENG KELURAHAN KAMP
TAHUN ANGGARAN : 2020

NO.

I PEKERJAAN PERSIAPAN
1 Pek. Pembuatan papan nama kegiatan

II PEKERJAAN (K3) KESEHATAN DAN KESELAMATAN KERJA


1 Pengadaan kartu identitas/Name Tag
2 Helm Pelindung (Safety Helmet)
3 Rompi Keselamatan
4 Masker Pelindung
5 Spanduk/Baner Keselamatan Kerja
6 Box/Kotak PPPK

III PEKERJAAN BONGKARAN DAN PENGANGKUTAN


1 Pek. Bongkaran paving lama
2 Pek. Pengangkutan bongkaran paving ke luar lokasi

IV PEKERJAAN URUGAN
1 Pek. Urugan pasir untuk perataan

V PEKERJAAN PASANGAN
1 Pas. Paving 20 X 20 cm tebal 8 cm (K 400) polos
2 Pas. Paving 20 x 20 cm tebal 6 cm (alur warna kuning)

VI PEKERJAAN BETON
1 Pek. Beton pengunci (Beton cor 1 : 2 : 3)

VII PEKERJAAN FINISHING


1 Pek. Pengecatan kanstin
TENAGA KERJA
DEMOBILISASI
MATERIAL
DEMOBILISASI
MOBILISASI
DEMOBILISASI

Jumlah Nilai Pekerjaan


Kemajuan Pekerjaan %
Kemajuan Pekerjaan Kumulatif %
ISATA UNGGULAN
AT PARKIR DI DTW EKS. PELABUHAN BULELENG
ELURAHAN KAMPUNG BUGIS

MASA PELAKSANAAN SELA


VOLUME SATUAN BOBOT BULAN I BULAN II
Minggu Minggu Minggu Minggu Minggu Minggu

7 7 7 7 7 7
3 4 5 1 2 3 4 5 6

1.00 ls 0.035 0.035

15.00 bh 0.011 0.001 0.001 0.001 0.001 0.001 0.001


15.00 bh 0.189 0.011 0.011 0.011 0.011 0.011 0.011
15.00 bh 0.081 0.005 0.005 0.005 0.005 0.005 0.005
20.00 bks 0.094 0.005 0.005 0.005 0.005 0.005 0.005
5.00 m2 0.141 0.141
1.00 unit 0.071 0.071

2,246.68 m2 5.640 1.410 1.410 1.410 1.410


263.20 m3 2.009 0.502 0.502 0.502 0.502

68.70 m3 2.907 1.454 1.454

2,120.50 m2 80.969 6.747


115.74 m2 4.160

5.31 m3 1.036

294.43 m3 2.66
MTMT MTMT MTMT MTMT MTMT MTMT
ASI
MBMB MBMB MBMB MBMB MBMB MBMB
ASI
MPMP MPMP MPMP MPMP MPMP MPMP
ASI

1.68 1.93 1.93 1.93 1.98 8.22


1.68 3.61 5.54 7.48 9.45 17.68
SA PELAKSANAAN SELAMA 120 (DUA RATU EMPAT PULUH ) HARI KALENDER
BULAN II BULAN III BULAN 1V
Minggu Minggu Minggu Minggu Minggu Minggu Minggu Minggu Minggu Minggu

7 7 7 7 7 7 7 7 7 7
7 8 9 10 11 12 13 14 15 16

0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011

0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005
0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005

6.747 6.747 6.747 6.747 6.747 6.747 6.747 6.747 6.747 6.747
1.040 1.040 1.040 1.040

0.345 0.345 0.345

0.443 0.443 0.443 0.443 0.443 0.443


MTMT MTMT MTMT MTMT MTMT MTMT MTMT MTMT MTMT MTMT

MBMB MBMB MBMB MBMB MBMB MBMB MBMB MBMB MBMB MBMB

MPMP MPMP MPMP MPMP MPMP MPMP MPMP MPMP MPMP MPMP

7.81 7.81 7.81 8.15 7.56 7.56 7.21 7.21 7.21 7.21
25.48 33.29 41.10 49.25 56.81 64.37 71.58 78.79 86.00 93.21
BULAN VI
Minggu Minggu PROSENTASE KETERANGAN
7 1
17 18

0.001 0.001
0.011 0.011

0.005 0.005
0.005 0.005
180 ( SERATUS DELAPAN PULUH HARI ) HARI KALENDER

MASA PEMELIHARAAN

6.747
MTMT MTMT
DT
MBMB MBMB
DT
MPMP MPMP
DT

6.77 0.02 -
99.98 100.00

Singaraja, 30 Maret 2020


CV. LESTARI

KETUT RANGGA
Direktur
BARCHAT
KEGIATAN : PENGEMBANGAN OBJEK PARIWISATA UNGGULAN
PEKERJAAN : PEKERJAAN PEMBUATAN TEMPAT PARKIR DI DTW
LOKASI : EKS. PELABUHAN BULELENG KELURAHAN KAMP
TAHUN ANGGARAN : 2020

NO.

I PEKERJAAN PERSIAPAN
1 Pek. Pembuatan papan nama kegiatan

II PEKERJAAN (K3) KESEHATAN DAN KESELAMATAN KERJA


1 Pengadaan kartu identitas/Name Tag
2 Helm Pelindung (Safety Helmet)
3 Rompi Keselamatan
4 Masker Pelindung
5 Spanduk/Baner Keselamatan Kerja
6 Box/Kotak PPPK

III PEKERJAAN BONGKARAN DAN PENGANGKUTAN


1 Pek. Bongkaran paving lama
2 Pek. Pengangkutan bongkaran paving ke luar lokasi

IV PEKERJAAN URUGAN
1 Pek. Urugan pasir untuk perataan

V PEKERJAAN PASANGAN
1 Pas. Paving 20 X 20 cm tebal 8 cm (K 400) polos
2 Pas. Paving 20 x 20 cm tebal 6 cm (alur warna kuning)

VI PEKERJAAN BETON
1 Pek. Beton pengunci (Beton cor 1 : 2 : 3)

VII PEKERJAAN FINISHING


1 Pek. Pengecatan kanstin

Jumlah Nilai Pekerjaan


Kemajuan Pekerjaan %
Kemajuan Pekerjaan Kumulatif %
ISATA UNGGULAN
AT PARKIR DI DTW EKS. PELABUHAN BULELENG
ELURAHAN KAMPUNG BUGIS

MASA PELAKSANAAN SELA


VOLUME SATUAN BOBOT BULAN I BULAN II
Minggu Minggu Minggu Minggu Minggu Minggu

7 7 7 7 7 7
3 4 5 1 2 3 4 5 6

1.00 ls 0.035 0.035

15.00 bh 0.011 0.001 0.001 0.001 0.001 0.001 0.001


15.00 bh 0.189 0.011 0.011 0.011 0.011 0.011 0.011
15.00 bh 0.081 0.005 0.005 0.005 0.005 0.005 0.005
20.00 bks 0.094 0.005 0.005 0.005 0.005 0.005 0.005
5.00 m2 0.141 0.141
1.00 unit 0.071 0.071

2,246.68 m2 5.640 1.410 1.410 1.410 1.410


263.20 m3 2.009 0.502 0.502 0.502 0.502

68.70 m3 2.907 1.454 1.454

2,120.50 m2 80.969 6.747


115.74 m2 4.160

5.31 m3 1.036

294.43 m3 2.66

100.00 1.68 1.93 1.93 1.93 1.98 8.22


1.68 3.61 5.54 7.48 9.45 17.68
SA PELAKSANAAN SELAMA 120 (DUA RATU EMPAT PULUH ) HARI KALENDER
BULAN II BULAN III BULAN 1V
Minggu Minggu Minggu Minggu Minggu Minggu Minggu Minggu Minggu Minggu

7 7 7 7 7 7 7 7 7 7
7 8 9 10 11 12 13 14 15 16

0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011

0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005
0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005

6.747 6.747 6.747 6.747 6.747 6.747 6.747 6.747 6.747 6.747
1.040 1.040 1.040 1.040

0.345 0.345 0.345

0.443 0.443 0.443 0.443 0.443 0.443

7.81 7.81 7.81 8.15 7.56 7.56 7.21 7.21 7.21 7.21
25.48 33.29 41.10 49.25 56.81 64.37 71.58 78.79 86.00 93.21
BULAN VI
Minggu Minggu PROSENTASE KETERANGAN
7 1
17 18

0.001 0.001
180 ( SERATUS DELAPAN PULUH HARI ) HARI KALENDER

0.011 0.011

0.005 0.005
0.005 0.005
MASA PEMELIHARAAN

6.747

6.77 0.02 -
99.98 100.00

Singaraja, 30 Maret 2020


CV. LESTARI

KETUT RANGGA
Direktur
FORMULIR REKAPITULASI PERHITUNGAN TINGKAT K
DALAM NEGERI (TKDN)

KEGIATAN : PENGEMBANGAN OBJEK PARIWISATA UNGGULAN


PEKERJAAN : PEKERJAAN PEMBUATAN TEMPAT PARKIR DI DTW EKS. PELABUHAN BULELEN
LOKASI : EKS. PELABUHAN BULELENG KELURAHAN KAMPUNG BUGIS
TAHUN ANGGARAN : 2020

Nilai Gabungan Barang/ Jasa (Rp)

Uraian Pekerjaan
DN LN

(1) (2) (3)


Barang
I. Material Langsung 339,409,987.77 -
(Bahan baku)
II. Peralatan (Barang jadi) 21,213,124.24 -
A. Sub Total Barang 360,623,112.00 -
Jasa
III. Manajemen Proyek 21,213,124.24 -
dan Perekayasaan
IV. Alat Kerja/Fasilitas Kerja 21,213,124.24 -
V. Konstruksi dan Fabrikasi - -
VI. Jasa Umum 21,213,124.24 -
B. Sub Total Jasa 63,639,372.71 -

C. Total Biaya (A + B) 424,262,484.71 -

Formulasi perhitungan :

% TKDN (Gabungan Barang dan Jasa) = Nilai Barang Total (3C) - Nilai Barang Lu
Nilai Gabungan Barang dan Jasa (9C)

= 360,623,112.00
424,262,484.71
0.850

= Nilai Jasa Total (8C) - Nilai Jasa Luar N


Nilai Gabungan Barang dan Jasa (9C)
= 63,639,372.71
424,262,484.71
0.150
PERHITUNGAN TINGKAT KOMPONEN
M NEGERI (TKDN)

W EKS. PELABUHAN BULELENG


UNG BUGIS

Gabungan Barang/ Jasa (Rp) TKDN


Total Barang/
Ribu % Jasa Gabungan
Rp KDN
(4) (5) (6) (7)

339,409,987.77 100.00 80

21,213,124.24 100.00 5
360,623,112.00 200.00

21,213,124.24 100.00 5

21,213,124.24 100.00 5
- -
21,213,124.24 100.00 5
63,639,372.71 300.00

424,262,484.71 500.00

ng Total (3C) - Nilai Barang Luar Negeri (3B)


ungan Barang dan Jasa (9C)

Total (8C) - Nilai Jasa Luar Negeri (8B)


ungan Barang dan Jasa (9C)
Singaraja, 30 Maret 2020
CV. LESTARI

KETUT RANGGA
Direktur
424,262,484.71
42,426,248.47
466,688,733.18

Anda mungkin juga menyukai