225
100
300
300
G AM BAR RE NCA NA
K ABU PA TEN
B ULUKU M BA
150
150
KE CA MA TAN
KA J AN G
DESA
BA TU NILAMU NG
150
JE NIS PR ASA RA NA
+ 0,40
MC KU MU M
150
L OK AS I KE GIA T AN
+ 0,45
DU SU NP ARU KK U
+ 0,40 + 0,40
JUD UL GAM BA R
Den ah &TA MPAK SAM PIN G
D en ah
SK ALA 1 CM : 1 00 CM
Digambar/D irenc a nak an O leh:
Ti m Peng elol a Kegia tan T enaga P ere nca na
150
SA EN AL ABI DIN , S.P d RA DEN A YU K USTRI A
g
AB D. R AU F
LEMBA R
150 150
± 0,00
GAM BA RR EN CAN A
KAB UP ATE N
BUL UK UM BA
K ECAMA TAN
K AJ ANG
D ES A
P OSS I TANA H
J ENI S PR AS AR ANA
M CK UM UM
LO KAS I KE G IA TAN
B ON TO MARAH E
JU DUL GA MB AR
TA MP AK
45
D ig am bar /Dir enca na kan Ole h: SAEN AL ABI DIN , S. Pd RA DEN AY UK US TRIA
Tim Pen ge lo la Kegiatan Ten aga Perenc ana
POTONGAN
SA ENA L A BIDI N, S .Pd RAD EN AY U KUST RIA
45
D IPERIK SA OLE H :
Tenag a Ah li Infras truk tur Desa
I r. B USTAM
TAMPAK DEPA N
SKA LA 1 CM : 20 C M
D iset uju i Ole h
Ke pa la De sa Pos si T anah
KA SM AT ALI
SKALA 1 CM : 100 CM
L EM BAR
150 100
TAMPAK DEPAN
SKALA 1 CM : 100 CM
Kesilir, ……………..2021
Disetujui Oleh Dibuat Oleh,
PJ Kepala Desa Kesilir Kader Teknik Desa Kesilir
Propinsi : JAWA TIMUR
Kabupaten : JEMBER REKAPITULASI
Kecamatan : WULUHAN RENCANA ANGGARAN BIAYA
Desa : KESILIR
Usulan Kegiatan : PEMB. TOILET umum
NO. BOBOT
URAIAN PEKERJAAN BAHAN PERALATAN UPAH
RAB (%)
HARGA
REKAP BAHAN, UPAH DAN ALAT VOL. SAT. TOTAL
SATUAN
BAHAN
Batu Gunung 2.00 M³ 233,000.00 466,000.00
Semen Portland 58.87 sak 72,500.00 4,268,365.00
Pasir 9.68 M³ 255,000.00 2,467,730.63
Kayu terentang 0.78 M³ 2,182,000.00 1,709,324.25
Paku biasa 2' -5' 11.94 Kg 18,000.00 214,920.00
Minyak bekisting 5.97 Ltr 45,000.00 268,650.00
besi 10 72.56 btg 64,000.00 4,643,783.78
Besi 6 14.00 btg 54,000.00 756,000.00
Kawat beton 6.99 Kg 24,800.00 173,328.75
Kerikil 3.52 M3 286,000.00 1,005,593.88
Bata Merah 3,089.00 Bh 700.00 2,162,300.00
Keramik 20/25 13.00 dos 65,500.00 851,500.00
Semen Warna 24.00 kg 15,000.00 360,000.00
Semen pvc 8.00 sak 72,500.00 580,000.00
Tegel keramik 20/20 8.00 dos 59,000.00 472,000.00
paku 2.00 Kg 20,000.00 40,000.00
trifleks 6.00 lbr 45,000.00 270,000.00
- Pek. Pipa Air Bersih Ø 3/4" 4.00 btg 30,000.00 120,000.00
- Pek. Pipa Air Kotor Ø 4" 4.00 btg 100,000.00 400,000.00
Kran Air 8.00 Bh 22,000.00 176,000.00
Sealtape 1.00 Bh 5,000.00 5,000.00
Floor Drain 2.00 Bh 27,000.00 54,000.00
Closet Jongkok 2.00 Unit 300,000.00 600,000.00
Kusen & Daun Pintu Aluminium 2.00 unit 300,000.00 600,000.00
Grendel Pintu 2.00 bh 16,500.00 33,000.00
Engsel Pintu 2.00 bh 33,000.00 66,000.00
Plamuur 6.00 Kg 30,500.00 183,000.00
Cat Dasar Tembok 6.00 Kg 21,000.00 126,000.00
Cat Penutup Tembok 6.00 Kg 22,700.00 136,200.00
JUMLAH 23,208,696.28
HARGA
REKAP BAHAN, UPAH DAN ALAT VOL. SAT. TOTAL
SATUAN
ALAT
1 Kertas Gosok - Lbr 3500.00 -
2 Kuas 2" 1.00 Bh 12500.00 12,500.00
3 Kuas 4" 2.00 Bh 15000.00 30,000.00
JUMLAH 42,500.00
UPAH
1 Pekerja 58.00 - 80,000.00 4,640,000.00
2 Tukang Batu 33.00 - 100,000.00 3,300,000.00
3 Tukang Kayu 4.00 - 100,000.00 400,000.00
4 Tukang besi 3.00 - 100,000.00 300,000.00
6 Tukang Cat 4.00 - 100,000.00 400,000.00
7 Kepala Tukang 16.00 - 100,000.00 1,600,000.00
JUMLAH 10,640,000.00
TOTAL 33,891,196.28
-
Disetujui Oleh Tenaga Perencana Dibuat Oleh
Kepala Desa Batunilamung Infrastruktur Teknik TPK Desa batunilamung
HARGA
NO U R A I A N KOEF. VOLUME TOTAL (Rp.)
SATUAN (Rp.)
I. B A H A N
1.1 Kusen & Daun Pintu Aluminium 1.000 2.000 unit 300,000 600,000
1.2
1.3
SUB TOTAL I 600,000
II. PERALATAN
2.1.
2.2.
SUB TOTAL II -
III. U P A H
3.1
3.2
3.3
Kesilir, ……………..2021
Disetujui Oleh Dibuat Oleh,
PJ Kepala Desa Kesilir Kader Teknik Desa Kesilir
HARGA
NO U R A I A N KOEF. VOLUME TOTAL (Rp.)
SATUAN (Rp.)
I. B A H A N
1.1 Grendel Pintu 1.000 2.00 bh 16,500 33,000
1.2
1.3
1.4
SUB TOTAL I 33,000
II. PERALATAN
2.1.
2.2.
SUB TOTAL II -
III. U P A H
3.1 Pekerja 0.015 1.00 Oh 75,000 75,000
3.2 Tukang Kayu 0.150 1.00 Oh 100,000 100,000
3.3 Kepala tukang 0.015 1.00 Oh 100,000 100,000
SUB TOTAL III 275,000
TOTAL 308,000
Kesilir, ……………..2021
Disetujui Oleh Dibuat Oleh,
PJ Kepala Desa Kesilir Kader Teknik Desa Kesilir
HARGA
NO U R A I A N KOEF. VOLUME TOTAL (Rp.)
SATUAN (Rp.)
I. B A H A N
1.1 Engsel Pintu 1.000 2.00 bh 33,000 66,000
1.2
1.3
SUB TOTAL I 66,000
II. PERALATAN
2.1.
2.2.
SUB TOTAL II -
III. U P A H
3.1 Pekerja 0.015 1.00 Oh 75,000 75,000
3.2 Tukang Kayu 0.150 1.00 Oh 100,000 100,000
3.3 Kepala tukang 0.015 1.00 Oh 100,000 100,000
SUB TOTAL III 275,000
TOTAL 341,000
Kesilir, ……………..2021
Disetujui Oleh Dibuat Oleh,
PJ Kepala Desa Kesilir Kader Teknik Desa Kesilir
HARGA
NO U R A I A N KOEF. VOLUME TOTAL (Rp.)
SATUAN (Rp.)
I. B A H A N
I.1 Cat Meni 0.200 - Kg 35,000 -
I.2 Dempul Kayu 0.250 - Kg 30,300 -
I.3 Cat Besi 0.250 - Kg 85,000 -
SUB TOTAL I -
II. PERALATAN
II.1. Kertas Gosok 0.2000 - Lbr 3,500 -
II.2. Kuas 2" 0.0750 - Bh 12,500 -
II.3.
SUB TOTAL II -
III. U P A H
III.1 Pekerja 0.100 - Oh 75,000 -
III.2 Tukang Cat 0.210 - Oh 100,000 -
III.3 Kepala Tukang 0.010 - Oh 100,000 -
Kesilir, ……………..2021
Disetujui Oleh Dibuat Oleh,
PJ Kepala Desa Kesilir Kader Teknik Desa Kesilir
HARGA
NO U R A I A N KOEF. VOLUME TOTAL (Rp.)
SATUAN (Rp.)
I. B A H A N
I.1. Plamuur 0.100 6.00 Kg 30,500 183,000
I.2. Cat Dasar Tembok 0.100 6.00 Kg 20,320 121,920
I.3. Cat Penutup Tembok 0.260 15.00 Kg 22,700 340,500
SUB TOTAL I 645,420.00
II. PERALATAN
II.1. Kuas 4" 0.0300 2.00 Bh 15,000 30,000
II.2.
II.3.
SUB TOTAL II 30,000.00
III. U P A H
III.1. Pekerja 0.0200 1.00 Oh 75,000 75,000
III.2. Tukang Cat 0.0630 4.00 Oh 100,000 400,000
III.3. Kepala Tukang 0.0063 - Oh 100,000 -
SUB TOTAL III 475,000
TOTAL 1,150,420
Kesilir, ……………..2021
Disetujui Oleh Dibuat Oleh,
PJ Kepala Desa Kesilir Kader Teknik Desa Kesilir
HARGA
NO U R A I A N KOEF. VOLUME TOTAL (Rp.)
SATUAN (Rp.)
I. B A H A N
I.1. Rangka Besi Aluminium Hollow 4.000 - M1 7,500 -
I.2. Assesoris 1.000 - Ls 7,500 -
SUB TOTAL I -
II. PERALATAN
II.1.
II.2.
II.3.
SUB TOTAL II -
III. U P A H
III.1. Pekerja 0.3500 - Oh 75,000 -
III.2. Tukang 0.3500 - Oh 110,900 -
III.3. Kepala Tukang 0.0530 - Oh 100,000 -
SUB TOTAL III -
TOTAL -
Kesilir, ……………..2021
Disetujui Oleh Dibuat Oleh,
PJ Kepala Desa Kesilir Kader Teknik Desa Kesilir
HARGA
NO U R A I A N KOEF. VOLUME TOTAL (Rp.)
SATUAN (Rp.)
I. B A H A N
I.1. Gypsum Board 0.364 4.00 lembar 66,000 264,000
I.2. Paku Skrup 0.110 1.00 kg 60,000 60,000
I.3.
I.4.
SUB TOTAL I 324,000.00
II. PERALATAN
II.1.
II.2.
II.3.
SUB TOTAL II -
III. U P A H
III.1. Pekerja 0.1000 1.00 Oh 75,000 75,000
III.2. Tukang 0.0500 1.00 Oh 110,900 110,900
III.3. Kepala Tukang 0.0100 1.00 Oh 100,000 100,000
III.4.
III.5.
SUB TOTAL III 285,900
TOTAL 609,900
Kesilir, ……………..2021
Disetujui Oleh Dibuat Oleh,
PJ Kepala Desa Kesilir Kader Teknik Desa Kesilir
HARGA
NO U R A I A N KOEF. VOLUME TOTAL (Rp.)
SATUAN (Rp.)
I. B A H A N
1.1 Balok Kayu Kelas II 1.100 - M3 3,160,000 -
1.2 Besi Strip tebal 5 mm 15.000 - Kg 12,000 -
1.3 Paku 12 cm 3.000 - Kg 17,000 -
SUB TOTAL I -
II. PERALATAN
2.1.
2.2.
SUB TOTAL II -
III. U P A H
3.1 Pekerja 6.700 - Oh 75,000 -
3.2 Tukang Kayu 20.100 - Oh 100,000 -
3.3 Kepala Tukang 2.010 - Oh 100,000 -
SUB TOTAL III -
TOTAL -
Kesilir, ……………..2021
Disetujui Oleh Dibuat Oleh,
PJ Kepala Desa Kesilir Kader Teknik Desa Kesilir
HARGA
NO U R A I A N KOEF. VOLUME TOTAL (Rp.)
SATUAN (Rp.)
I. B A H A N
1.1 Seng Gelombang 3" x 6" 0.700 - Lbr 83,400 -
1.2 Paku Seng 0.020 - Kg 30,000 -
1.3
SUB TOTAL I -
II. PERALATAN
2.1.
2.2.
SUB TOTAL II -
III. U P A H
3.1 Pekerja 0.120 - Oh 75,000 -
3.2 Tukang 0.060 - Oh 100,000 -
3.3 Kepala Tukang 0.006 - Oh 100,000 -
SUB TOTAL III -
TOTAL -
Kesilir, ……………..2021
Disetujui Oleh Dibuat Oleh,
PJ Kepala Desa Kesilir Kader Teknik Desa Kesilir
HARGA
NO U R A I A N KOEF. VOLUME TOTAL (Rp.)
SATUAN (Rp.)
I. B A H A N
1.1 Seng Pelat 3" x 6" Bjls 35 0.300 - Lbr 61,000 -
1.2 Paku Seng 0.040 - Kg 30,000 -
1.3
SUB TOTAL I -
II. PERALATAN
2.1.
2.2.
SUB TOTAL II -
III. U P A H
3.1 Pekerja 0.150 - Oh 75,000 -
3.2 Tukang 0.070 - Oh 100,000 -
3.3 Kepala Tukang 0.007 - Oh 100,000 -
SUB TOTAL III -
TOTAL -
Kesilir, ……………..2021
Disetujui Oleh Dibuat Oleh,
PJ Kepala Desa Kesilir Kader Teknik Desa Kesilir
HARGA
NO U R A I A N KOEF. VOLUME TOTAL (Rp.)
SATUAN (Rp.)
I. B A H A N
I.1 Papan Calcyboard 1.100 - m 27,000 -
I.2 Paku biasa 2" - 5" 0.060 - kg 18,000 -
I.3
SUB TOTAL I -
II. PERALATAN
II.1.
II.2.
II.3.
SUB TOTAL II -
III. U P A H
III.1 Pekerja 0.100 - hari 75,000 -
III.2 Tukang 0.100 - hari 100,000 -
III.3 Kepala tukang 0.010 - hari 100,000 -
Kesilir, ……………..2021
Disetujui Oleh Dibuat Oleh,
PJ Kepala Desa Kesilir Kader Teknik Desa Kesilir
HARGA
NO U R A I A N KOEF. VOLUME TOTAL (Rp.)
SATUAN (Rp.)
I. B A H A N
I.1. Pipa PVC Ø 3/4 " 1.200 4.00 btg 30,000 120,000
I.2. Perlengkapan Pipa Air Bersih 0.350 1.00 ls 30,000 30,000
I.3.
SUB TOTAL I 150,000.00
II. PERALATAN
II.1.
II.2.
II.3.
SUB TOTAL II -
III. U P A H
III.1. Pekerja 0.0360 1.00 OH 75,000 75,000
III.2. Tukang Batu 0.0600 1.00 OH 100,000 100,000
III.3. Kepala tukang 0.0060 1.00 OH 100,000 100,000
SUB TOTAL III 275,000
TOTAL 425,000
Kesilir, ……………..2021
Disetujui Oleh Dibuat Oleh,
PJ Kepala Desa Kesilir Kader Teknik Desa Kesilir
HARGA
NO U R A I A N KOEF. VOLUME TOTAL (Rp.)
SATUAN (Rp.)
I. B A H A N
I.1. Pipa PVC Ø 3 " 1.20 4.00 btg 100,000 400,000.00
I.2. Perlengkapan Pipa 3" 0.35 1.00 ls 100,000 100,000
I.3.
SUB TOTAL I 500,000.00
II. PERALATAN
II.1.
II.2.
II.3.
SUB TOTAL II -
III. U P A H
III.1. Pekerja 0.081 1.00 Oh 75,000 75,000.00
III.2. Tukang Batu 0.135 1.00 Oh 100,000 100,000.00
III.3. Kepala tukang 0.014 1.00 Oh 100,000 100,000.00
SUB TOTAL III 275,000
TOTAL 775,000
Kesilir, ……………..2021
Disetujui Oleh Dibuat Oleh,
PJ Kepala Desa Kesilir Kader Teknik Desa Kesilir
HARGA
NO U R A I A N KOEF. VOLUME TOTAL (Rp.)
SATUAN (Rp.)
I. B A H A N
I.1. Kran Air 1.000 8.00 Bh 22,000 176,000
I.2. Sealtape 0.025 1.00 Bh 5,000 5,000
I.3.
SUB TOTAL I 181,000
II. PERALATAN
II.1.
II.2.
II.3.
SUB TOTAL II -
III. U P A H
III.1. Pekerja 0.010 1.00 Oh 75,000 75,000.00
III.2. Tukang Batu 0.400 3.00 Oh 100,000 300,000.00
III.3. Kepala tukang 0.040 1.00 Oh 100,000 100,000.00
SUB TOTAL III 475,000
TOTAL 656,000
Kesilir, ……………..2021
Disetujui Oleh Dibuat Oleh,
PJ Kepala Desa Kesilir Kader Teknik Desa Kesilir
HARGA
NO U R A I A N KOEF. VOLUME TOTAL (Rp.)
SATUAN (Rp.)
I. B A H A N
I.1. Floor Drain 1.000 2.00 Bh 27,000 54,000
I.2.
I.3.
SUB TOTAL I 54,000
II. PERALATAN
II.1.
II.2.
II.3.
SUB TOTAL II -
III. U P A H
III.1. Pekerja 0.010 1.00 Oh 75,000 75,000.00
III.2. Tukang Batu 0.100 1.00 Oh 100,000 100,000.00
III.3. Kepala tukang 0.010 1.00 Oh 100,000 100,000.00
SUB TOTAL III 275,000
TOTAL 329,000
Kesilir, ……………..2021
Disetujui Oleh Dibuat Oleh,
PJ Kepala Desa Kesilir Kader Teknik Desa Kesilir
HARGA
NO U R A I A N KOEF. VOLUME TOTAL (Rp.)
SATUAN (Rp.)
I. B A H A N
I.1.
I.2.
I.3.
I.4.
I.5.
SUB TOTAL I -
II. PERALATAN
II.1.
II.2.
II.3.
SUB TOTAL II -
III. U P A H
III.1. Pekerjaan Septick Tank 1.000 - Ls 2,500,000 -
III.2.
III.3.
III.4.
III.5.
SUB TOTAL III -
TOTAL -
Kesilir, ……………..2021
Disetujui Oleh Dibuat Oleh,
PJ Kepala Desa Kesilir Kader Teknik Desa Kesilir
HARGA
NO U R A I A N KOEF. VOLUME TOTAL (Rp.)
SATUAN (Rp.)
I. B A H A N
I.1. Closet Jongkok 1.000 2.00 Unit 300,000 600,000
I.2. Semen Portland 0.120 1.00 Sak 72,000 72,000
I.3. Pasir Pasang 0.010 1.00 M3 151,300 151,300
SUB TOTAL I 823,300
II. PERALATAN
II.1.
II.2.
II.3.
SUB TOTAL II -
III. U P A H
III.1. Pekerja 1.000 2.00 Oh 75,000 150,000.00
III.2. Tukang Batu 1.500 3.00 Oh 100,000 300,000.00
III.3. Kepala tukang 0.150 1.00 Oh 100,000 100,000.00
SUB TOTAL III 550,000
TOTAL 1,373,300
Kesilir, ……………..2021
Disetujui Oleh Dibuat Oleh,
PJ Kepala Desa Kesilir Kader Teknik Desa Kesilir
HARGA
NO U R A I A N KOEF. VOLUME TOTAL (Rp.)
SATUAN (Rp.)
I. B A H A N
1.1
1.2
1.3
SUB TOTAL I -
II. PERALATAN
2.1.
2.2.
SUB TOTAL II -
III. U P A H
3.1 Pekerja 0.550 5.00 OH 75,000 375,000
3.2 Kepala Kelompok 0.010 1.00 OH 100,000 100,000
3.3
SUB TOTAL III 475,000
TOTAL 475,000
Kesilir, ……………..2021
Disetujui Oleh Dibuat Oleh,
PJ Kepala Desa Kesilir Kader Teknik Desa Kesilir
HARGA
NO U R A I A N KOEF. VOLUME TOTAL (Rp.)
SATUAN (Rp.)
I. B A H A N
1.1 Batu Gunung 1.200 2.00 M³ 147,200 294,400
1.2 Semen Portland 3.260 7.00 sak 57,900 405,300
1.3 Pasir Pasangan 0.520 1.00 M³ 151,300 151,300
SUB TOTAL I 851,000
II. PERALATAN
2.1.
2.2.
SUB TOTAL II -
III. U P A H
3.1 Pekerja 0.300 1.00 OH 75,000 75,000
3.2 Tukang Batu 0.600 1.00 OH 110,900 110,900
3.3 Kepala Kelompok 0.022 1.00 OH 100,000 100,000
SUB TOTAL III 285,900
TOTAL 1,136,900
Kesilir, ……………..2021
Disetujui Oleh Dibuat Oleh,
PJ Kepala Desa Kesilir Kader Teknik Desa Kesilir
HARGA
NO U R A I A N KOEF. VOLUME TOTAL (Rp.)
SATUAN (Rp.)
I. B A H A N
I.1 Kayu terentang 0.220 0.10 M³ 2,182,000 218,200.00
I.2 Paku biasa 2' -5' 3.200 2.00 Kg 18,000 36,000.00
I.3 Minyak bekisting 1.600 1.00 Ltr 45,000 45,000.00
I.4 Besi beton polos 150.000 71.00 Kg 14,300 1,015,300.00
I.5 Kawat beton 2.250 1.00 Kg 24,800 24,800.00
I.6 Semen portland 6.720 3.00 Sak 57,900 173,700.00
I.7 Pasir Beton 0.540 1.00 M3 148,500 148,500.00
I.8 Kerikil 0.810 1.00 M3 253,000 253,000.00
SUB TOTAL I 1,914,500.00
II. PERALATAN
II.1.
II.2.
II.3.
SUB TOTAL II -
III. U P A H
III.1 Pekerja 0.300 1.00 OH 90,900 90,900
III.2 Tukang batu 1.050 1.00 OH 110,900 110,900
III.3 Tukang Kayu 1.050 1.00 OH 110,900 110,900
III.4 Tukang besi 3.050 1.00 OH 110,900 110,900
III.5 Kepala Tukang 0.010 1.00 OH 100,000 100,000
SUB TOTAL III 523,600
TOTAL 2,438,100
Kesilir, ……………..2021
Disetujui Oleh Dibuat Oleh,
PJ Kepala Desa Kesilir Kader Teknik Desa Kesilir
HARGA
NO U R A I A N KOEF. VOLUME TOTAL (Rp.)
SATUAN (Rp.)
I. B A H A N
I.1. Bata Merah 70.000 3,089.00 Bh 600 1,853,400
I.2. Semen Portland 0.286 13.00 Sak 57,900 752,700
I.3. Pasir Pasang 0.040 2.00 M³ 151,300 302,600
SUB TOTAL I 2,908,700.00
II. PERALATAN
II.1.
II.2.
II.3.
SUB TOTAL II -
III. U P A H
III.1. Pekerja 0.2200 10.00 OH 90,900 909,000
III.2. Tukang Batu 0.1000 4.00 OH 110,900 443,600
III.3. Kepala Tukang 0.0100 1.00 OH 100,000 100,000
SUB TOTAL III 1,452,600
TOTAL 4,361,300
Kesilir, ……………..2021
Disetujui Oleh Dibuat Oleh,
PJ Kepala Desa Kesilir Kader Teknik Desa Kesilir
HARGA
NO U R A I A N KOEF. VOLUME TOTAL (Rp.)
SATUAN (Rp.)
I. B A H A N
I.1. Tanah Timbunan 1.20 1.00 M³ 143,000 143,000.00
I.2.
I.3.
SUB TOTAL I 143,000.00
II. PERALATAN
II.1.
II.2.
II.3.
SUB TOTAL II -
III. U P A H
III.1. Pekerja 0.100 - OH 75,000 -
III.2. Kepala Kelompok 0.010 1.00 OH 100,000 100,000.00
III.3.
SUB TOTAL III 100,000
TOTAL 243,000
Kesilir, ……………..2021
Disetujui Oleh Dibuat Oleh,
PJ Kepala Desa Kesilir Kader Teknik Desa Kesilir
HARGA
NO U R A I A N KOEF. VOLUME TOTAL (Rp.)
SATUAN (Rp.)
I. B A H A N
I.1. Semen Portland 0.156 12.00 Sak 57,900 694,800
I.2. Pasir Pasangan 0.023 2.00 M³ 151,300 302,600
I.3.
SUB TOTAL I 997,400
II. PERALATAN
II.1.
II.2.
II.3.
SUB TOTAL II -
III. U P A H
III.1. Pekerja 0.200 16.00 OH 75,000 1,200,000.00
III.2. Tukang Batu 0.150 12.00 OH 110,900 1,330,800.00
III.3. Kepala Kelompok 0.015 1.00 OH 100,000 100,000.00
SUB TOTAL III 2,630,800
TOTAL 3,628,200
Kesilir, ……………..2021
Disetujui Oleh Dibuat Oleh,
PJ Kepala Desa Kesilir Kader Teknik Desa Kesilir
HARGA
NO U R A I A N KOEF. VOLUME TOTAL (Rp.)
SATUAN (Rp.)
I. B A H A N
I.1. Semen PC 0.065 5.00 sak 72,500 362,500
I.2.
I.3.
SUB TOTAL I 362,500
II. PERALATAN
II.1.
II.2.
II.3.
SUB TOTAL II -
III. U P A H
III.1. Pekerja 0.100 8.00 hari 90,900 727,200.00
III.2. Tukang Batu 0.010 1.00 hari 110,900 110,900.00
III.3. Kepala Tukang 0.010 1.00 hari 115,900 115,900.00
SUB TOTAL III 954,000
TOTAL 1,316,500
Kesilir, ……………..2021
Disetujui Oleh Dibuat Oleh,
PJ Kepala Desa Kesilir Kader Teknik Desa Kesilir
HARGA
NO U R A I A N KOEF. VOLUME TOTAL (Rp.)
SATUAN (Rp.)
I. B A H A N
I.1. Keramik 20/25 1.050 13.00 dos 65,500 851,500
I.2. Pasir Pasang 0.018 1.00 m3 151,300 151,300
I.3. Semen PC 0.186 2.00 sak 57,900 115,800
I.4. Semen Warna 1.940 23.00 kg 15,000 345,000
SUB TOTAL I 1,463,600
II. PERALATAN
II.1.
II.2.
II.3.
SUB TOTAL II -
III. U P A H
III.1. Pekerja 0.300 4.00 hari 75,000 300,000.00
III.2. Tukang Batu 0.250 3.00 hari 110,900 332,700.00
III.3. Kepala Tukang 0.090 1.00 hari 100,000 100,000.00
SUB TOTAL III 732,700
TOTAL 2,196,300
Kesilir, ……………..2021
Disetujui Oleh Dibuat Oleh,
PJ Kepala Desa Kesilir Kader Teknik Desa Kesilir
HARGA
NO U R A I A N KOEF. VOLUME TOTAL (Rp.)
SATUAN (Rp.)
I. B A H A N
I.1. Tegel keramik 20/20 1.050 8.00 dos 59,000 472,000
I.2. Pasir Pasang 0.010 1.00 m3 151,300 151,300
I.3. Semen PC 0.010 1.00 sak 57,900 57,900
I.4. Semen Warna 0.100 1.00 kg 15,000 15,000
SUB TOTAL I 696,200
II. PERALATAN
II.1.
II.2.
II.3.
SUB TOTAL II -
III. U P A H
III.1. Pekerja 0.300 3.00 hari 75,000 225,000.00
III.2. Tukang Batu 0.150 1.00 hari 110,900 110,900.00
III.3. Kepala Tukang 0.015 1.00 hari 100,000 100,000.00
SUB TOTAL III 435,900
TOTAL 1,132,100
Kesilir, ……………..2021
Disetujui Oleh Dibuat Oleh,
PJ Kepala Desa Kesilir Kader Teknik Desa Kesilir
HARGA
NO U R A I A N KOEF. VOLUME TOTAL (Rp.)
SATUAN (Rp.)
I. B A H A N
I.1 Kayu terentang 0.220 0.07 M³ - -
I.2 Paku biasa 2' -5' 3.200 0.97 Kg - -
I.3 Minyak bekisting 1.600 0.49 Ltr 33,000 16,038.00
I.4 Besi beton polos 150.000 45.56 Kg 75,000 3,417,187.50
I.5 Kawat beton 2.250 0.68 Kg 100,000 68,343.75
I.6 Semen portland 6.720 2.04 Sak 100,000 204,120.00
I.7 Pasir Beton 0.540 0.16 M3 - -
I.8 Kerikil 0.810 0.25 M3 - -
SUB TOTAL I 3,705,689.25
II. PERALATAN
II.1.
II.2.
II.3.
SUB TOTAL II -
III. U P A H
III.1 Pekerja 0.300 1.00 0.000 - -
III.2 Tukang batu 1.050 0.32 bh 29,700 9,472
III.3 Tukang Kayu 1.050 0.32 Oh 75,000 23,920
III.4 Tukang besi 3.050 0.93 Oh 100,000 92,644
III.5 Kepala Tukang 0.010 0.00 Oh 100,000 304
SUB TOTAL III 126,340
TOTAL 3,832,030
Kesilir, ……………..2021
Disetujui Oleh Dibuat Oleh,
PJ Kepala Desa Kesilir Kader Teknik Desa Kesilir
HARGA
NO U R A I A N KOEF. VOLUME TOTAL (Rp.)
SATUAN (Rp.)
I. B A H A N
I.1 Kayu terentang 0.220 0.04 M³ 100,000 4,455.00
I.2 Paku biasa 2' -5' 3.200 0.65 Kg - -
I.3 Minyak bekisting 1.600 0.32 Ltr - -
I.4 Besi beton polos 150.000 30.38 Kg - -
I.5 Kawat beton 2.250 0.46 Kg 27,000 12,301.88
I.6 Semen portland 6.720 1.36 Sak 75,000 102,060.00
I.7 Pasir Beton 0.540 0.11 M3 100,000 10,935.00
I.8 Kerikil 0.810 0.16 M3 100,000 16,402.50
SUB TOTAL I 146,154.38
II. PERALATAN
II.1.
II.2.
II.3.
SUB TOTAL II -
III. U P A H
III.1 Pekerja 0.300 0.06 OH - -
III.2 Tukang batu 1.050 0.21 OH - -
III.3 Tukang Kayu 1.050 0.21 OH - -
III.4 Tukang besi 3.050 0.62 OH 495,000 305,724
III.5 Kepala Tukang 0.010 0.00 OH 450,000 911
SUB TOTAL III 306,636
TOTAL 452,790
Kesilir, ……………..2021
Disetujui Oleh Dibuat Oleh,
PJ Kepala Desa Kesilir Kader Teknik Desa Kesilir
HARGA
NO U R A I A N KOEF. VOLUME TOTAL (Rp.)
SATUAN (Rp.)
I. B A H A N
I.1 Trikles 0.220 0.57 kg - -
I.2 Paku biasa 2' -5' 3.200 8.32 Oh - -
I.3 Minyak bekisting 1.600 4.16 Oh 13,700 56,992.00
I.4 Besi beton polos 150.000 390.00 Oh 13,700 5,343,000.00
I.5 Kawat beton 2.250 5.85 kg 75,000 438,750.00
I.6 Semen portland 6.720 17.47 kg 100,000 1,747,200.00
I.7 Pasir Beton 0.540 1.40 kg 100,000 140,400.00
I.8 Kerikil 0.810 2.11 m3 - -
SUB TOTAL I 7,726,342.00
II. PERALATAN
II.1.
II.2.
II.3.
SUB TOTAL II -
III. U P A H
III.1 Pekerja 0.300 0.78 0.000 - -
III.2 Tukang batu 1.050 2.73 0.000 - -
III.3 Tukang Kayu 1.050 2.73 0.000 10,000 27,300
III.4 Tukang besi 3.050 7.93 dos 11,000 87,230
III.5 Kepala Tukang 0.010 0.03 m3 12,000 312
SUB TOTAL III 114,842
TOTAL 7,841,184
Kesilir, ……………..2021
Disetujui Oleh Dibuat Oleh,
PJ Kepala Desa Kesilir Kader Teknik Desa Kesilir
Jenis Prasarana : PEMB. TOILET umum
Desa : KESILIR
Kecamatan : WULUHAN PERHITUNGAN VOLUME
Kabupaten : JEMBER
- Pek. Galian Tanah Pondasi Garis & Bt. Bata - Pek. Pas. Dinding Keramik 20x25
0.25 + 0.45
x 0.45
2.00 = M3
- Pek. Pas. Dinding Bata Trassaram - Pek. Pipa Air Bersih Ø 3/4" = 3.00 M
- Pek. Plesteran Dinding Trassaram - Pek. Pas. Pintu Aluminium = 2.00 unit
- Pek. Pas. Kloset Jongkok = 2.00 bh - Pek. Pas. Floor Drain = 2.00 bh
- Pek. Pas. Septick Tank = unit pek. Beton bertulang 2.00 x 2.00 = 0.80
Kesilir, ……………..2021
Disetujui Oleh Dibuat Oleh,
PJ Kepala Desa Kesilir Kader Teknik Desa Kesilir
Drs. MUKHAMAD SULTHONY MOH. FATONI
Jenis Prasarana :
Desa :
Kecamatan :
PERHITUNGAN VOLUME
Kabupaten :
URAIAN PEKERJAAN DAN HITUNGAN VOLUME
M2
= - M3
= #DIV/0! M3
- Pekerjaan Sloef Beton 15/20
= 2.00 x 0.15 x 0.25 = 0.08 M3
- Pekerjaan kolom
= x 3.00 = - M3
41
Harga Satuan Jumlah Harga
No. Uraian
Rupiah Rupiah
0.010 OH Kepala Tukang @Rp. 100,000.00 Rp. 1,000.00
Rp. 4,084,053.00
42
Harga Satuan Jumlah Harga
No. Uraian
Rupiah Rupiah
0.186 sak Semen PC @Rp. 57,900.00 Rp. 10,769.40
1.940 kg Semen Warna @Rp. 15,000.00 Rp. 29,100.00
0.300 hari Pekerja @Rp. 75,000.00 Rp. 18,750.00
0.250 hari Tukang Batu @Rp. 110,900.00 Rp. 9,981.00
0.090 hari Kepala Tukang @Rp. 100,000.00 Rp. 30,000.00
Rp. 170,098.80
43
Harga Satuan Jumlah Harga
No. Uraian
Rupiah Rupiah
Rp. 87,004.00
44
Harga Satuan Jumlah Harga
No. Uraian
Rupiah Rupiah
0.024 m3 Papan Kayu Kls I @Rp. 15,000,000.00 Rp. 360,000.00
0.500 kg Lem Kayu @Rp. 28,000.00 Rp. 14,000.00
0.800 hari Pekerja @Rp. 75,000.00 Rp. 60,000.00
2.400 hari Tukang Kayu @Rp. 100,000.00 Rp. 240,000.00
0.240 hari Kepala Tukang @Rp. 100,000.00 Rp. 24,000.00
Rp. 698,000.00
45
Harga Satuan Jumlah Harga
No. Uraian
Rupiah Rupiah
1 M2 Cat Besi
0.2000 Kg Cat Meni @ Rp 35,000.00 Rp. 7,000.00
0.2500 Kg Dempul Kayu @ Rp 30,300.00 Rp. 7,575.00
0.2000 Lbr Kertas Gosok @ Rp 3,500.00 Rp. 700.00
0.2500 Kg Cat Besi @ Rp 85,000.00 Rp. 21,250.00
0.0750 Bh Kuas 2" @ Rp 12,500.00 Rp. 937.50
0.1000 Oh Pekerja @ Rp 75,000.00 Rp. 7,500.00
0.2100 Oh Tukang Cat @ Rp 100,000.00 Rp. 21,000.00
0.0100 Oh Kepala Tukang @ Rp 100,000.00 Rp. 1,000.00
Rp. 51,687.50
1 M2 Mengecat Listplank
0.260 kg Cat Penutup Tembok @Rp. 22,700.00 Rp. 5,902.00
0.100 kg Cat Dasar Tembok @Rp. 20,320.00 Rp. 2,032.00
0.100 kg Plamur @Rp. 30,500.00 Rp. 3,050.00
1.000 Bh Kuas 4" @Rp. 15,000.00 Rp. 15,000.00
0.063 hari Tukang Cat @Rp. 100,000.00 Rp. 6,300.00
0.006 hari Kepala Tukang @Rp. 100,000.00 Rp. 630.00
0.020 hari Pekerja @Rp. 75,000.00 Rp. 1,500.00
Rp. 34,414.00
46
Harga Satuan Jumlah Harga
No. Uraian
Rupiah Rupiah
1 Bh PasangCloset Duduk
1.000 Bh Closet Duduk @Rp. 1,732,800.00 Rp. 1,732,800.00
0.060 Bh Perlengkapan Closet Duduk @Rp. 1,732,800.00 Rp. 103,968.00
3.300 Oh Pekerja @Rp. 75,000.00 Rp. 247,500.00
1.100 Oh Tukang Batu @Rp. 100,000.00 Rp. 110,000.00
0.010 Oh Kepala tukang @Rp. 100,000.00 Rp. 1,000.00
Rp. 2,195,268.00
47
Harga Satuan Jumlah Harga
No. Uraian
Rupiah Rupiah
0.01 Oh Kepala tukang @Rp. 100,000.00 Rp. 900.00
Rp. 50,470.00
1 M PAS. PIPA PVC AW Ø 2"
1.20 m Pipa PVC Ø 2 " @Rp. 13,700.00 Rp. 16,440.00
0.35 ls Perlengkapan Pipa 2" @Rp. 13,700.00 Rp. 13,700.00
0.05 Oh Pekerja @Rp. 75,000.00 Rp. 4,050.00
0.09 Oh Tukang Batu @Rp. 100,000.00 Rp. 9,000.00
0.01 Oh Kepala tukang @Rp. 100,000.00 Rp. 900.00
Rp. 44,090.00
1 M PAS. MCB
3.00 Btg Pipa Listrik @Rp. 10,000.00 Rp. 30,000.00
15.00 m Kabel @Rp. 11,000.00 Rp. 11,000.00
1.00 bh T Dus @Rp. 12,000.00 Rp. 12,000.00
2.00 bh L Bow @Rp. 17,300.00 Rp. 17,300.00
24.00 bh Klem @Rp. 200.00 Rp. 200.00
1.00 bh MCB @Rp. 67,800.00 Rp. 67,800.00
1.00 Oh Pekerja Listrik @Rp. 90,900.00 Rp. 90,900.00
Rp. 229,200.00
48
Harga Satuan Jumlah Harga
No. Uraian
Rupiah Rupiah
49
Harga Satuan Jumlah Harga
No. Uraian
Rupiah Rupiah
0.070 Oh Tukang @Rp. 100,000 Rp. 7,000.00
0.007 Oh Kepala Tukang @Rp. 100,000 Rp. 700.00
Rp. 38,450.00
50
DAFTAR HARGA TENAGA KERJA
NOMOR /
URAIAN TENAGA KERJA SATUAN HARGA
KODE
L-01 Pekerja Oh Rp 75,000
L-02 Tukang batu Oh Rp 100,000
L-03 Tukang Kayu Oh Rp 100,000
L-04 Tukang besi Oh Rp 100,000
L-05 Kepala Tukang Oh Rp 100,000
L-06 Tukang Las Oh Rp 100,000
L-07 Tukang Oh Rp 100,000
L-08 Tukang Cat Oh Rp 100,000
L-09 Pekerja Listrik Oh Rp 75,000
NOMOR /
URAIAN MATERIAL SATUAN HARGA
KODE
51
L-07 Tukang Oh Rp 100,000
L-08 Tukang Cat Oh Rp 100,000
L-09 Pekerja Listrik Oh Rp 75,000
Pasir Pasangan M3 Rp 151,300
52
L-07 Tukang Oh Rp 100,000
L-08 Tukang Cat Oh Rp 100,000
L-09 Pekerja Listrik Oh Rp 75,000
M-45 Kunci Tanam Biasa Bh Rp 130,000
Sealtape Bh Rp 5,000
Kabel M Rp 11,000
T Dus Bh Rp 12,000
L Bow Bh Rp 17,300
Klem Bh Rp 200
Mongkok Bh Rp 17,300
Saklar Bh Rp 27,700
Fitting Bh Rp 17,300
53
L-07 Tukang Oh Rp 100,000
L-08 Tukang Cat Oh Rp 100,000
L-09 Pekerja Listrik Oh Rp 75,000
Stop Kontak Bh Rp 27,800
MCB Bh Rp 67,800
Plamuur Kg Rp 30,500
Linggis Bh Rp 75,000
Sekop Bh Rp 125,000
Ampelas Bh Rp 3,500
...................................... …………………………
54
L-07 Tukang Oh Rp 100,000
L-08 Tukang Cat Oh Rp 100,000
L-09 Pekerja Listrik Oh Rp 75,000
Pilot light 220 VAC c/w neon bulb & fuse Unit
55