PC1.
70 BH 30 BH 10 LBR 2 X PAKAI 198,000
PC.2
24 BH 12 BH 12 LBR 2 X PAKAI 198,000
PC.3
20 BH 10 BH 10 LBR 2 X PAKAI 198,000
PC.4
4 BH 4 BH 4 LBR 2 X PAKAI 198,000
36 40
57.6 M2
13.4 M2
219.4 M2 220 50,000 11,000,000
1,980,000.0
2,376,000.0
1,980,000.0 1
792,000.0
7,128,000.0
A HARGA HPS
A HARGA HPS
2,500 500,000
225,688 15,798,160
373,558 8,965,392
575,295 11,505,900
668,040 2,672,160
TOTAL 39,441,612
5,000 1,000,000
225,688 15,798,160
373,558 8,965,392
575,295 11,505,900
668,040 2,672,160
TOTAL 39,941,612
PENAWARAN HARGA UPAH
KODE
PEKERJAAN PEMBUATAN PILECAP MASJID JAMIATUSSHOLIHIN
LOKASI Jl. UNGGAS - SIMPANG TIGA - PEKANBARU PC
TAHUN 2020
TOTAL
* Gambar terlampir
Pekanbaru, ..........................................2020
Di tawar Oleh :
NAMA JELAS
Jabatan