RENCANA PEMBONGKARAN ABUTMENT

JEMBATAN BENTANG Hb
NO. KETERANGAN
EXISTING RENCANA EXISTING RENCANA Existing
1 NUNUKA BINEHA V 33 30 Bongkar 2 Abutment 4.05
2 SINOMBAYUGA I SINOMBAYUGA I 33 40 Bongkar 2 Abutment 4.45
3 SINOMBAYUGA II MANGGADAA 33 40 Bongkar 2 Abutment 4.70
4 INOSOTA 1 INOSOTA I 40 40 Bongkar 2 Abutment 5.20
5 MAYAMBANGA III MAYAMBANGA III 33 30 Bongkar 2 Abutment 4.60
6 BAKIDA I MAMALIA II 20 20 Bongkar 2 Abutment 3.45
TOTAL 192 200

T1

X2 Hk
X1

H1

H2

Ht

Hb

HF2
HF1

40 M'

33 M' 3.5
Luas 1 = T1 x Hk
Luas 2 = T2 x Ht
Luas 3 = 1/2 ( H1 + H2 ) x X1
Luas 4 = 1/2 ( H1 + H2 ) x X1

T1 Hk T2 Ht H1 H2 X1 X2 Luas

BINEHA V 0.40 1.00 0.80 4.05 0.40 0.40 0.50 0.50 4.04

SINOMBAYUGA I 0.40 1.00 0.80 4.45 0.40 0.40 0.50 0.50 4.36

MANGGADAA 0.40 1.00 0.80 4.70 0.40 0.40 0.50 0.50 4.56

INOSOTA I 0.40 1.00 0.80 5.20 0.40 0.40 0.50 0.50 4.96

MAYAMBANGA III 0.40 1.00 0.80 4.60 0.40 0.40 0.50 0.50 4.48

MAMALIA II 0.40 1.00 0.80 3.45 0.40 0.40 0.50 0.50 3.56

Badan Abutment Kaki Abutment VOLUME


Luas Bdn lebar Vol. X 2 HF1 HF2 TF1 TF2 Vol. X 2 ABUTMENT
BINEHA V 4.04 7.00 56.56 0.70 0.30 5.00 0.80 61.18 117.74

SINOMBAYUGA I 4.36 7.00 61.04 0.70 0.30 5.00 0.80 61.18 122.22

MANGGADAA 4.56 7.20 65.66 0.70 0.30 5.00 0.80 62.93 128.59

INOSOTA I 4.96 7.70 76.38 0.70 0.30 5.00 0.80 67.30 143.68

MAYAMBANGA III 4.48 7.20 64.51 0.70 0.30 5.00 0.80 62.93 127.44

MAMALIA II 3.56 7.10 50.55 0.70 0.30 5.00 0.80 62.05 112.61

TOTAL VOLUME PEMBONGKARAN ABUTMENT 752.28


RENCANA PEMBONGKARAN JEMBATAN

JEMBATAN EXISTING LANTAI BANGUNAN


NO.
EXISTING RENCANA BENTANG LEBAR JEMB ATAS
1 NUNUKA BINEHA V 33 3.5 Beton R.B.BAILEY
2 SINOMBAYUGA I SINOMBAYUGA I 33 3.5 Kayu R.B.BAILEY
3 SINOMBAYUGA II MANGGADAA 33 3.5 Kayu R.B.BAILEY
4 INOSOTA 1 INOSOTA I 40 4.5 Kayu R.B. AUSTRIA
5 MAYAMBANGA III MAYAMBANGA III 33 3.5 Kayu R.B.BAILEY
6 BAKIDA I MAMALIA II 20 4.5 Beton R.B. AUSTRIA
TOTAL 192

PEMBONGKARAN LANTAI JEMBATAN KAYU

JEMBATAN EXISTING LANTAI


NO. LUAS
EXISTING RENCANA BENTANG LEBAR JEMB
1 SINOMBAYUGA I SINOMBAYUGA I 33 3.5 Kayu 115.50
2 SINOMBAYUGA II MANGGADAA 33 3.5 Kayu 115.50
3 INOSOTA 1 INOSOTA I 40 4.5 Kayu 180.00
4 MAYAMBANGA III MAYAMBANGA III 33 3.5 Kayu 115.50
TOTAL 139 526.50

PEMBONGKARAN LANTAI JEMBATAN BETON, TEBAL LANTAI 0,20 M'

JEMBATAN EXISTING LANTAI


NO. VOLUME
EXISTING RENCANA BENTANG LEBAR JEMB
1 NUNUKA BINEHA V 33 3.5 Beton 23.10
2 BAKIDA I MAMALIA II 20 4.5 Beton 18.00
TOTAL 53 41.10

PEMBONGKARAN RANGKA JEMBATAN ( KIRI, KANAN DAN BALOK BAWAH )

JEMBATAN EXISTING TINGGI BANGUNAN


NO.
EXISTING RENCANA BENTANG LEBAR RANGKA ATAS
1 NUNUKA BINEHA V 33 3.5 1.5 214.50
2 SINOMBAYUGA I SINOMBAYUGA I 33 3.5 1.5 214.50
3 SINOMBAYUGA II MANGGADAA 33 3.5 1.5 214.50
4 INOSOTA 1 INOSOTA I 40 4.5 3 420.00
5 MAYAMBANGA III MAYAMBANGA III 33 3.5 1.5 214.50
6 BAKIDA I MAMALIA II 20 4.5 3 210.00
TOTAL 192 1,488.00
RENCANA ABUTMENT

JEMBATAN BENTANG Hb
NO. KET.
EXISTING RENCANA EXISTING RENCANA Existing
1 NUNUKA BINEHA V 33 30 4.05

2 SINOMBAYUGA I SINOMBAYUGA I 33 40 4.45


3 SINOMBAYUGA II MANGGADAA 33 40 4.70
4 INOSOTA 1 INOSOTA I 40 40 5.20
5 MAYAMBANGA III MAYAMBANGA III 33 30 4.60

6 BAKIDA I MAMALIA II 20 20 3.45


TOTAL 192 200

b6
b7 b5
h8 I

h7

h6

h5

h1 h4

h3

h2

b2 b4
b3

b1
PERHITUNGAN VOLUME BETON PADA ABUTMENT (K-250)

UKURAN
JEMBATAN
b1 b2 b3 b4 b5 b6 b7
BINEHA V 6.00 2.55 0.90 2.55 0.80 0.30 0.20
BINEHA V (PILAR) 6.00 2.55 0.90 2.55 0.85 0.30 0.85
SINOMBAYUGA I 6.00 2.25 1.50 2.25 1.40 0.50 0.35
MANGGADAA 6.00 2.25 1.50 2.25 1.40 0.50 0.35
INOSOTA I 6.00 2.25 1.50 2.25 1.40 0.50 0.35
MAYAMBANGA III 6.00 2.50 1.00 2.50 0.80 0.30 0.20
MAYAMBANGA III (PILAR) 6.00 2.55 0.90 2.55 0.85 0.30 0.85
MAMALIA II 6.00 2.50 1.00 2.50 0.85 0.30 0.20

PERHITUNGAN LUAS

LUAS I = b6 x h8
LUAS II = (b6+b7) x h7
LUAS III = (b5+b6+b7)) x h6
LUAS IV = 1/2 x ((b5+b6+b7)-b3)) x h5
LUAS V = b3 x (h4+h5)
LUAS VI = (1/2 x (b1+b3)) x h3
LUAS VII = b1 x h2

PERHITUNGAN VOLUME BETON PADA ABUTMENT (K-250)


LUAS ABUTMET
JEMBATAN
I II III IV V VI VII
BINEHA V 0.105 0.350 0.520 0.060 4.455 1.035 5.400
BINEHA V (PIER) 0.315 0.000 0.800 0.435 4.185 1.035 5.400
SINOMBAYUGA I 0.175 1.063 1.126 0.188 7.725 1.125 9.000
MANGGADAA 0.175 1.063 1.126 0.188 8.175 1.125 9.000
INOSOTA I 0.175 1.063 1.126 0.188 9.150 1.125 9.000
MAYAMBANGA III 0.105 0.350 0.520 0.045 5.100 1.050 6.000
MAYAMBANGA III (PILAR) 0.105 0.863 1.000 0.165 4.770 1.035 5.400
MAMALIA II 0.105 0.525 0.540 0.053 4.350 1.050 6.000

ABUTMENT
JEMBATAN
Kaki Badan Kepala
BINEHA V #REF! #REF! 0.00
SINOMBAYUGA I #REF! #REF! 452.90
MANGGADAA #REF! #REF! 462.89
INOSOTA I #REF! #REF! 484.53
MAYAMBANGA III #REF! #REF! 0.00
MAMALIA II #REF! #REF! 280.22

VOLUME ABUTMENT SEBELAH


VOLUME ABUTMENT KIRI & KANAN

PERHITUNGAN VOLUME BETON PADA DINDING SAYAP (K-250)


Dimensi
JEMBATAN
Hb Exist Hb Hsayap Lebar tebal Jumlah
BINEHA V 4.05 5.35 6.75 2.25 0.25 4
SINOMBAYUGA I 4.45 5.65 7.05 2.25 0.25 4
MANGGADAA 4.70 5.95 7.35 2.25 0.25 4
INOSOTA I 5.20 6.60 8.00 2.25 0.25 4
MAYAMBANGA III 4.60 5.80 7.20 2.25 0.25 4
MAMALIA II 3.45 4.75 6.15 2.25 0.25 4

VOLUME

PERHITUNGAN VOLUME BETON PADA PLAT INJAK (K-350)


Dimensi
JEMBATAN
p1 p2 t1 t2 L
BINEHA V 2.50 0.20 0.30 0.35 9.00
SINOMBAYUGA I 2.50 0.20 0.30 0.35 9.00
MANGGADAA 2.50 0.20 0.30 0.35 9.00
INOSOTA I 2.50 0.20 0.30 0.35 9.00
MAYAMBANGA III 2.50 0.20 0.30 0.35 9.00
MAMALIA II 2.50 0.20 0.30 0.35 9.00

VOLUME SATU PLAT INJAK


VOLUME DUA PLAT INJAK ( TOTAL)

PERHITUNGAN VOLUME BETON PADA PONDASI SUMURAN (K-175)


Dimensi
JEMBATAN
Tinggi diameter Jumlah
BINEHA V 5.00 4.00 6.00
SINOMBAYUGA I 4.00 4.00 4.00
MANGGADAA 3.00 4.00 4.00
INOSOTA I 5.50 4.00 4.00
MAYAMBANGA III 4.00 4.00 6.00
MAMALIA II 5.00 4.00 4.00
PERHITUNGAN VOLUME BETON PADA LANTAI JEMBATAN (K-350)
Dinding Sayap
JEMBATAN
t l p banyaknya jumlah VOL
BINEHA V :
1. Lantai Jembtan 0.20 7.00 15.80 1.00 2.00 44.24
2. Gelagar Memanjang 0.85 0.45 15.80 6.00 2.00 72.52
3. Gelagar Melintang 0.50 0.30 6.25 5.00 2.00 9.38

SINOMBAYUGA I
Diatas Spandeck 0.12 7.00 40.80 1.00 1.00 34.27
Bersama Spandek 0.08 7.00 40.80 1.00 1.00 18.28

MANGGADAA
Diatas Spandeck 0.12 7.00 40.80 1.00 1.00 34.27
Bersama Spandek 0.08 7.00 40.80 1.00 1.00 18.28

INOSOTA I
Diatas Spandeck 0.12 7.00 40.80 1.00 1.00 34.27
Bersama Spandek 0.08 7.00 40.80 1.00 1.00 18.28

MAYAMBANGA III :
1. Lantai Jembtan 0.20 7.00 15.80 1.00 2.00 44.24
2. Gelagar Memanjang 0.85 0.45 15.80 6.00 2.00 72.52
3. Gelagar Melintang 0.50 0.30 6.25 5.00 2.00 9.38

MAMALIA II :
1. Lantai Jembtan 0.20 7.00 20.80 1.00 1.00 29.12
2. Gelagar Memanjang 20.80 6.00 1.00 58.22 Luas
3. Gelagar Melintang 0.80 0.30 7.00 5.00 1.00 8.40

PERHITUNGAN VOLUME BETON PADA TROTOIR (K-175)


Dinding Sayap
JEMBATAN
t l p banyaknya jumlah
BINEHA V : 0.25 1.30 15.80 2.00 2.00
SINOMBAYUGA I 0.25 1.00 40.80 2.00 1.00
MANGGADAA 0.25 1.00 40.80 2.00 1.00
INOSOTA I 0.25 1.00 40.80 2.00 1.00
MAYAMBANGA III 0.25 1.30 15.80 2.00 2.00
MAMALIA II 0.25 1.30 20.80 2.00 1.00
PERHITUNGAN VOLUME BETON PADA LANTAI KERJA (K-125)

JEMBATAN
t l p banyaknya jumlah
BINEHA V :
1. Dibawah Pond. Sumuran 0.10 4.20 11.10 1.00 3.00
2. Dibawah Abudment 0.10 6.40 11.10 1.00 3.00

SINOMBAYUGA I
1. Dibawah Pond. Sumuran 0.10 4.20 11.10 1.00 2.00
2. Dibawah Abudment 0.10 6.40 11.10 1.00 2.00

MANGGADAA
1. Dibawah Pond. Sumuran 0.10 4.20 11.10 1.00 2.00
2. Dibawah Abudment 0.10 6.40 11.10 1.00 2.00

INOSOTA I
1. Dibawah Pond. Sumuran 0.10 4.20 11.10 1.00 2.00
2. Dibawah Abudment 0.10 6.40 11.10 1.00 2.00

MAYAMBANGA III
1. Dibawah Pond. Sumuran 0.10 4.20 11.10 1.00 3.00
2. Dibawah Abudment 0.10 6.40 11.10 1.00 3.00

MAMALIA II
1. Dibawah Pond. Sumuran 0.10 4.20 11.10 1.00 2.00
2. Dibawah Abudment 0.10 6.40 11.10 1.00 2.00

PERHITUNGAN VOLUME BETON PADA TIANG SANDARAN (K-350)


Dinding Sayap
JEMBATAN
b1 b2 b3 h1 h2 h3
BINEHA V 0.15 0.16 0.10 0.45 0.45 0.10
SINOMBAYUGA I
MANGGADAA
INOSOTA I
MAYAMBANGA III 0.15 0.16 0.10 0.45 0.45 0.10
MAMALIA II 0.15 0.16 0.10 0.45 0.45 0.10
UKURAN
h1 h2 h3 h4 h5 h6 h7 h8
7.60 0.90 0.30 4.65 0.30 0.40 0.70 0.35
7.60 0.90 0.30 4.65 0.30 0.40 0.70 0.35
9.05 1.50 0.30 4.65 0.50 0.50 1.25 0.35
9.35 1.50 0.30 4.95 0.50 0.50 1.25 0.35
10.00 1.50 0.30 5.60 0.50 0.50 1.25 0.35
8.15 1.00 0.30 4.80 0.30 0.40 0.70 0.35
8.10 0.90 0.30 5.00 0.30 0.50 0.75 0.35
7.45 1.00 0.30 4.05 0.30 0.40 1.05 0.35

Volume
LEBAR VOLUME
TOTAL 2 ABUTM
11.925 23.850 11.1 264.735
12.170 12.170 11.1 135.087 399.82
20.401 40.802 11.1 452.8967 452.90
20.851 41.702 11.1 462.8867 462.89
21.826 43.652 11.1 484.5317 484.53
13.170 26.340 11.1 292.374
13.338 13.338 11.1 148.0463 440.42
12.623 25.245 11.1 280.2195 280.22

ABUTMENT Volume

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
#REF!

Dimensi
VOLUME
15.19
15.86
16.54
18.00
16.20
13.84

95.63

Dimensi
VOLUME
6.84
6.84
6.84
6.84
6.84
6.84

41.04
82.08

Dimensi
VOLUME
377.14
201.14
150.86
276.57
301.71
251.43

1558.86
Dinding Sayap
VOLUME

126.14

52.55

52.55

52.55

126.14
Khusus Balok memanjang Jembatan Mamalia II :
b1 b2 b3 h1 h2 h3 h4
0.56 0.3 0.4 0.35 0.1 0.7 0.05
I II III IV Total 95.74
0.196 0.043 0.21 0.0175 0.4665

Dinding Sayap
VOLUME
20.54
20.40
20.40
20.40
20.54
13.52

115.80
VOLUME
vol

13.99
21.31 35.30

9.32
14.21 23.53

9.32
14.21 23.53

9.32
14.21 23.53

13.99
21.31 35.30

9.32
14.21 23.53

164.72

Dinding Sayap
VOLUME
Luas t Jumlah
0.17 0.10 36.00 0.62

0.17 0.10 36.00 0.62


0.17 0.10 22.00 0.38

1.61
No Uraian Mutu Beton
K-350 K-250 K-175

1 Bineha V
a. Lantai Jembatan 126.14
a.1. Tiang sandaran 0.62
b. Plat Injakan 6.84
c. Abudment + Pier 399.82
d. Dinding Sayap 15.19
e. Trotoir / sumuran 20.54
f. Lantai Kerja
133.59 415.01 20.54
2 Mayembanga III
a. Lantai Jembatan 126.14
a.1. Tiang sandaran 0.62
b. Plat Injakan 6.84
c. Abudment + Pier 440.42
d. Dinding Sayap 16.20
e. Trotoir / sumuran 20.54
f. Lantai Kerja
133.59 456.62 20.54
3 Mamalia II
a. Lantai Jembatan 95.74
a.1. Tiang sandaran 0.38
b. Plat Injakan 6.84
c. Abudment + Pier 280.22
d. Dinding Sayap 13.84
e. Trotoir / sumuran 13.52
f. Lantai Kerja
102.96 294.06 13.52
4 Sinombayuga I
a. Lantai Jembatan 52.55
b. Plat Injakan 6.84
c. Abudment + Pier 452.90
d. Dinding Sayap 15.86
e. Trotoir / sumuran 20.40
f. Lantai Kerja
59.39 468.76 20.40
5 Manggadaa
a. Lantai Jembatan 52.55
b. Plat Injakan 6.84
c. Abudment + Pier 462.89
d. Dinding Sayap 16.54
e. Trotoir / sumuran 20.40
f. Lantai Kerja
59.39 479.42 20.40
6 Inosota I
a. Lantai Jembatan 52.55
b. Plat Injakan 6.84
c. Abudment + Pier 484.53
d. Dinding Sayap 18.00
e. Trotoir / sumuran 20.40
f. Lantai Kerja
59.39 502.53 20.40
Cyclop K-175 K-125

377.14
35.30
377.14 35.30

301.71
35.30
301.71 35.30

251.43
23.53
251.43 23.53

201.14
23.53
201.14 23.53

150.86
23.53
150.86 23.53
276.57
23.53
276.57 23.53
RENCANA PENULANGAN ABUTMENT JEMBATAN MAMALIA

a Jml Panjang Tot.Pj Dia (mm) JML TLG


a 1 555 555 22
b A1 b 1 80 80 22 (900/20
+ 1) * 2
kait 2 12 24 22
JUMLAH 659.00 22.00 92.00 60,628.00

Jml Panjang Tot.Pj Dia (cm) JML TLG


b a 1 900 900 13
a A2 b 1 60 60 13 (475/25
+ 1) * 2
kait 2 6.5 13 13
JUMLAH 973.00 13.00 40.00 38,920.00

Jml Panjang Tot.Pj Dia (cm) JML TLG


b b a 1 40 40 13
a A3 b 2 60 120 13
kait 2 6.5 13 13
JUMLAH 173.00 13.00 110.00 19,030.00

Jml Panjang Tot.Pj Dia (mm) JML TLG


a 1 480 480 32
b b F1 b 2 45 90 32 900/20
+1
a kait 2 16 32 32
JUMLAH 602.00 32.00 46.00 27,692.00

Jml Panjang Tot.Pj Dia (cm) JML TLG


a a 1 60 60 32
b b F2 b 2 212 424 32 900/20
+1
kait 2 16 32 32
JUMLAH 516.00 13.00 46.00 23,736.00

Jml Panjang Tot.Pj Dia (cm) JML TLG


a F3 a 1 900 900 16
JUMLAH 900.00 16.00 25.00 22,500.00

Jml Panjang Tot.Pj Dia (cm) JML TLG


a F4 a 1 900 900 16
JUMLAH 900.00 16.00 25.00 22,500.00

Jml Panjang Tot.Pj Dia (cm) JML TLG


a 1 40 40 13
b b F5.1 b 2 55 110 13
a kait 2 6.5 13 13
JUMLAH 163.00 13.00 24.00 3,912.00

Jml Panjang Tot.Pj Dia (cm) JML TLG


a 1 40 40 13
b b F5.2 b 2 65 130 13
a kait 2 6.5 13 13
JUMLAH 183.00 13.00 24.00 4,392.00

Jml Panjang Tot.Pj Dia (cm) JML TLG


a 1 40 40 13
b b F5.3 b 2 75 150 13
a kait 2 6.5 13 13
JUMLAH 203.00 13.00 24.00 4,872.00
a Jml Panjang Tot.Pj Dia (cm) JML TLG
b a 1 110 110 22
b 1 30 30 22
c F5.4 c 1 70 70 22
kait 1 6.5 6.5 22
JUMLAH 216.50 22.00 46.00 9,959.00

a Jml Panjang Tot.Pj Dia (cm) JML TLG


b a 1 20 20 22
b 1 40 40 22
c H1 c 1 180 180 22
kait 1 11 11 22
JUMLAH 251.00 22.00 46.00 11,546.00

a Jml Panjang Tot.Pj Dia (cm) JML TLG


a 1 30 30 22
b 1 140 140 22
b H2
kait 1 11 11 22
JUMLAH 181.00 22.00 61.00 11,041.00

Jml Panjang Tot.Pj Dia (cm) JML TLG


a H3 a 1 900 900 12
JUMLAH 900.00 12.00 8.00 7,200.00

Jml Panjang Tot.Pj Dia (cm) JML TLG


a H4 a 1 900 900 12
JUMLAH 900.00 12.00 12.00 10,800.00

RENCANA PENULANGAN DINDING SAYAP


Jml Panjang Tot.Pj Dia (cm) JML TLG
a W1 a 1 675 675 16
JUMLAH 675.00 16.00 24.00 16,200.00

Jml Panjang Tot.Pj Dia (cm) JML TLG


a a 1 200 200 10
W2 kait 2 5 10 10
JUMLAH 210.00 16.00 35.00 7,350.00

Jml Panjang Tot.Pj Dia (mm) JML TLG


a 1 200 200 10
b b W3 b 2 20 40 10
a kait 2 5 10 10
JUMLAH 250.00 10.00 35.00 8,750.00

RENCANA PENULANGAN PLAT INJAK


Jml Panjang Tot.Pj Dia (cm) JML TLG
a b a 1 295 295 13
c e b 1 20 20 13
c 1 30 30 13
PI1 d 1 15 15 13
900/20+1
e 1 40 40 13
kait 1 5 5 13
d JUMLAH 405.00 13.00 46.00 18,630.00

Jml Panjang Tot.Pj Dia (cm) JML TLG


a a 1 295 295 13
PI2 kait 2 5 10 13
JUMLAH 305.00 13.00 46.00 14,030.00

Jml Panjang Tot.Pj Dia (mm) JML TLG

PI3
a a 1 890 890 13
PI3 300/20+1
JUMLAH 890.00 13.00 32.00 28,480.00

BERAT BAJA TULANGAN ULIR UNTUK KG/M'

DIAMETER D10 D13 D16 D19 D22 D25 D29 D32


Kg / M' 0.617 1.040 1.580 2.230 2.980 3.850 5.190 6.310

BERAT BAJA TULANGAN POLOS

Berat Jenis Baja Tulangan /BJ = 7.85 ton/m3


7,850 Kg/m3
0.00785 Kg/Cm3

Volume = Panjang x Luas --------------------Luas = 1/4 x π x D2

Berat Tulangan = Volume x BJ

BERAT TULANGAN ULIR


F1 F2
Diameter 32 mm
6.310 276.92 237.36 3,245.11
A1 F5.4 H1 H2
Diameter 22 mm
2.980 606.28 99.59 115.46 110.41 2,776.59
F3 F4 W1
Diameter 16 mm
1.580 225 225 162 966.96
A2 A3 F5.1 F5.2 F5.3
1.040 389.2 190.3 39.12 43.92 48.72 1,375.57
Diameter 13 mm
PI1 PI2 PI3
186.3 140.3 284.8
W2 W3
Diameter 10 mm
0.617 73.5 87.5 99.34

BERAT TULANGAN ULIR 8,463.56

BERAT TULANGAN POLOS


DIAMETER KODE Panjang Dia Luas Volume BJ Berat (kg)
H3 72 0.012 0.000113 0.0081 7,850 63.89
Diameter 12 mm
H4 108 0.012 0.000113 0.0122 7,850 95.84

BERAT TULANGAN POLOS 159.73


.
RENCANA PENULANGAN ABUTMENT JEMBATAN BINEHA V
45.5

a Jml Panjang Tot.Pj Dia (mm) JML TLG


a 1 655 655 32
b A1 b 1 80 80 32 (910/15
+ 1)
kait 2 12 24 32
JUMLAH 759.00 32.00 62.00 47,058.00

Jml Panjang Tot.Pj Dia (cm) JML TLG


b a 1 655 655 19
a A2 b 1 60 60 19 (910/20
+ 1)
kait 2 6.5 13 19
JUMLAH 728.00 19.00 47.00 34,216.00

Jml Panjang Tot.Pj Dia (cm) JML TLG


a a 1 910 910 16
a A3 b 0 60 0 16 (535/30
+ 1) *2
kait 2 6.5 13 16
JUMLAH 923.00 16.00 38.00 35,074.00

Jml Panjang Tot.Pj Dia (cm) JML TLG


b b a 1 91 91 13
a A4 b 2 60 120 13
kait 2 6.5 13 13
JUMLAH 224.00 13.00 126.00 28,224.00

Jml Panjang Tot.Pj Dia (mm) JML TLG


a 1 480 480 32
b b F1 b 2 45 90 32 900/20
+1
a kait 2 16 32 32
JUMLAH 602.00 32.00 46.00 27,692.00

Jml Panjang Tot.Pj Dia (cm) JML TLG


a a 1 60 60 32
b b F2 b 2 212 424 32 900/20
+1
kait 2 16 32 32
JUMLAH 516.00 13.00 46.00 23,736.00

Jml Panjang Tot.Pj Dia (cm) JML TLG


a F3 a 1 900 900 16
JUMLAH 900.00 16.00 25.00 22,500.00

Jml Panjang Tot.Pj Dia (cm) JML TLG


a F4 a 1 900 900 16
JUMLAH 900.00 16.00 25.00 22,500.00

Jml Panjang Tot.Pj Dia (cm) JML TLG


a 1 40 40 13
b b F5.1 b 2 55 110 13
a kait 2 6.5 13 13
JUMLAH 163.00 13.00 24.00 3,912.00

Jml Panjang Tot.Pj Dia (cm) JML TLG


a 1 40 40 13
b b F5.2 b 2 65 130 13
a kait 2 6.5 13 13
JUMLAH 183.00 13.00 24.00 4,392.00

Jml Panjang Tot.Pj Dia (cm) JML TLG


a 1 40 40 13
b b F5.3 b 2 75 150 13
a kait 2 6.5 13 13
JUMLAH 203.00 13.00 24.00 4,872.00
a Jml Panjang Tot.Pj Dia (cm) JML TLG
b a 1 110 110 22
b 1 30 30 22
c F5.3 c 1 70 70 22
kait 1 6.5 6.5 22
JUMLAH 216.50 22.00 46.00 9,959.00

a Jml Panjang Tot.Pj Dia (cm) JML TLG


b a 1 20 20 22
b 1 40 40 22
c H1 c 1 180 180 22
kait 1 11 11 22
JUMLAH 251.00 22.00 46.00 11,546.00

a Jml Panjang Tot.Pj Dia (cm) JML TLG


a 1 30 30 22
b 1 140 140 22
b H2
kait 1 11 11 22
JUMLAH 181.00 22.00 61.00 11,041.00

Jml Panjang Tot.Pj Dia (cm) JML TLG


a H3 a 1 900 900 12
JUMLAH 900.00 12.00 8.00 7,200.00

Jml Panjang Tot.Pj Dia (cm) JML TLG


a H4 a 1 900 900 12
JUMLAH 900.00 12.00 12.00 10,800.00

RENCANA PENULANGAN DINDING SAYAP


Jml Panjang Tot.Pj Dia (cm) JML TLG
a W1 a 1 735 735 16
JUMLAH 735.00 16.00 24.00 17,640.00

Jml Panjang Tot.Pj Dia (cm) JML TLG


a a 1 200 200 10
W2 kait 2 5 10 10
JUMLAH 210.00 10.00 38.00 7,980.00

Jml Panjang Tot.Pj Dia (mm) JML TLG


a 1 200 200 10
b b W3 b 2 20 40 10
a kait 2 5 10 10
JUMLAH 250.00 10.00 38.00 9,500.00

RENCANA PENULANGAN PLAT INJAK


Jml Panjang Tot.Pj Dia (cm) JML TLG
a b a 1 295 295 13
c e b 1 20 20 13
c 1 30 30 13
PI1 d 1 15 15 13
900/20+1
e 1 40 40 13
kait 1 5 5 13
d JUMLAH 405.00 13.00 46.00 18,630.00

Jml Panjang Tot.Pj Dia (cm) JML TLG


a a 1 295 295 13
PI2 kait 2 5 10 13
JUMLAH 305.00 13.00 46.00 14,030.00

Jml Panjang Tot.Pj Dia (mm) JML TLG

PI3
a a 1 890 890 13
PI3 300/20+1
JUMLAH 890.00 13.00 32.00 28,480.00

BERAT BAJA TULANGAN ULIR UNTUK KG/M'

DIAMETER D10 D13 D16 D19 D22 D25 D29 D32


Kg / M' 0.617 1.040 1.580 2.230 2.980 3.850 5.190 6.310

BERAT BAJA TULANGAN POLOS

Berat Jenis Baja Tulangan /BJ = 7.85 ton/m3


7,850 Kg/m3
0.00785 Kg/Cm3

Volume = Panjang x Luas --------------> Luas = 1/4 x π x D2

Berat Tulangan = Volume x BJ

BERAT TULANGAN ULIR


F1 F2
Diameter 32 mm
6.310 276.92 237.36 3,245.11
A1 F5.4 H1 H2
Diameter 22 mm
2.980 470.58 99.59 115.46 110.41 2,372.20
F3 F4 W1
Diameter 16 mm
1.580 225 225 176.4 989.71
A2 A3 F5.1 F5.2 F5.3
1.040 342.16 282.24 39.12 43.92 48.72 1,422.26
Diameter 13 mm
PI1 PI2 PI3
186.3 140.3 284.8
W2 W3
Diameter 10 mm
0.617 79.8 95 107.85

BERAT TULANGAN ULIR 8,137.13

BERAT TULANGAN POLOS


DIAMETER KODE Panjang Dia Luas Volume BJ Berat (kg)
H3 72 0.012 0.000113 0.0081 7,850 63.89
Diameter 12 mm
H4 108 0.012 0.000113 0.0122 7,850 95.84

BERAT TULANGAN POLOS 159.73


.
RENCANA PENULANGAN ABUTMENT JEMBATAN SIBOMBAYUGA I

a Jml Panjang Tot.Pj Dia (mm) JML TLG


a 1 645 645 22
b A1 b 1 80 80 22 (900/20
+ 1) * 2
kait 2 12 24 22
JUMLAH 749.00 22.00 92.00 68,908.00

Jml Panjang Tot.Pj Dia (cm) JML TLG


b a 1 900 900 13
a A2 b 1 60 60 13 (565/25
+ 1) * 2
kait 2 6.5 13 13
JUMLAH 973.00 13.00 48.00 46,704.00

Jml Panjang Tot.Pj Dia (cm) JML TLG


b b a 1 40 40 13
a A3 b 2 60 120 13
kait 2 6.5 13 13
JUMLAH 173.00 13.00 132.00 22,836.00

Jml Panjang Tot.Pj Dia (mm) JML TLG


a 1 480 480 32
b b F1 b 2 45 90 32 900/20
+1
a kait 2 16 32 32
JUMLAH 602.00 32.00 46.00 27,692.00

Jml Panjang Tot.Pj Dia (cm) JML TLG


a a 1 60 60 32
b b F2 b 2 212 424 32 900/20
+1
kait 2 16 32 32
JUMLAH 516.00 13.00 46.00 23,736.00

Jml Panjang Tot.Pj Dia (cm) JML TLG


a F3 a 1 900 900 16
JUMLAH 900.00 16.00 25.00 22,500.00

Jml Panjang Tot.Pj Dia (cm) JML TLG


a F4 a 1 900 900 16
JUMLAH 900.00 16.00 25.00 22,500.00

Jml Panjang Tot.Pj Dia (cm) JML TLG


a 1 40 40 13
b b F5.1 b 2 55 110 13
a kait 2 6.5 13 13
JUMLAH 163.00 13.00 24.00 3,912.00

Jml Panjang Tot.Pj Dia (cm) JML TLG


a 1 40 40 13
b b F5.2 b 2 65 130 13
a kait 2 6.5 13 13
JUMLAH 183.00 13.00 24.00 4,392.00

Jml Panjang Tot.Pj Dia (cm) JML TLG


a 1 40 40 13
b b F5.3 b 2 75 150 13
a kait 2 6.5 13 13
JUMLAH 203.00 13.00 24.00 4,872.00
a Jml Panjang Tot.Pj Dia (cm) JML TLG
b a 1 110 110 22
b 1 30 30 22
c F5.3 c 1 70 70 22
kait 1 6.5 6.5 22
JUMLAH 216.50 22.00 46.00 9,959.00

a Jml Panjang Tot.Pj Dia (cm) JML TLG


b a 1 20 20 22
b 1 40 40 22
c H1 c 1 180 180 22
kait 1 11 11 22
JUMLAH 251.00 22.00 46.00 11,546.00

a Jml Panjang Tot.Pj Dia (cm) JML TLG


a 1 30 30 22
b 1 140 140 22
b H2
kait 1 11 11 22
JUMLAH 181.00 22.00 61.00 11,041.00

Jml Panjang Tot.Pj Dia (cm) JML TLG


a H3 a 1 900 900 12
JUMLAH 900.00 12.00 8.00 7,200.00

Jml Panjang Tot.Pj Dia (cm) JML TLG


a H4 a 1 900 900 12
JUMLAH 900.00 12.00 12.00 10,800.00

RENCANA PENULANGAN DINDING SAYAP


Jml Panjang Tot.Pj Dia (cm) JML TLG
a W1 a 1 765 765 16
JUMLAH 765.00 16.00 24.00 18,360.00

Jml Panjang Tot.Pj Dia (cm) JML TLG


a a 1 200 200 10
W2 kait 2 5 10 10
JUMLAH 210.00 16.00 40.00 8,400.00

Jml Panjang Tot.Pj Dia (mm) JML TLG


a 1 200 200 10
b b W3 b 2 20 40 10
a kait 2 5 10 10
JUMLAH 250.00 10.00 40.00 10,000.00

RENCANA PENULANGAN PLAT INJAK


Jml Panjang Tot.Pj Dia (cm) JML TLG
a b a 1 295 295 13
c e b 1 20 20 13
c 1 30 30 13
PI1 d 1 15 15 13
900/20+1
e 1 40 40 13
kait 1 5 5 13
d JUMLAH 405.00 13.00 46.00 18,630.00

Jml Panjang Tot.Pj Dia (cm) JML TLG


a a 1 295 295 13
PI2 kait 2 5 10 13
JUMLAH 305.00 13.00 46.00 14,030.00

Jml Panjang Tot.Pj Dia (mm) JML TLG

PI3
a a 1 890 890 13
PI3 300/20+1
JUMLAH 890.00 13.00 32.00 28,480.00

BERAT BAJA TULANGAN ULIR UNTUK KG/M'

DIAMETER D10 D13 D16 D19 D22 D25 D29 D32


Kg / M' 0.617 1.040 1.580 2.230 2.980 3.850 5.190 6.310

BERAT BAJA TULANGAN POLOS

Berat Jenis Baja Tulangan /BJ = 7.85 ton/m3


7,850 Kg/m3
0.00785 Kg/Cm3

Volume = Panjang x Luas -------------> Luas = 1/4 x π x D2

Berat Tulangan = Volume x BJ

BERAT TULANGAN ULIR


F1 F2
Diameter 32 mm
6.310 276.92 237.36 3,245.11
A1 F5.4 H1 H2
Diameter 22 mm
2.980 689.08 99.59 115.46 110.41 3,023.33
F3 F4 W1
Diameter 16 mm
1.580 225 225 183.6 1,001.09
A2 A3 F5.1 F5.2 F5.3
1.040 467.04 228.36 39.12 43.92 48.72 1,496.10
Diameter 13 mm
PI1 PI2 PI3
186.3 140.3 284.8
W2 W3
Diameter 10 mm
0.617 84 100 113.53

BERAT TULANGAN ULIR 8,879.15

BERAT TULANGAN POLOS


DIAMETER KODE Panjang Dia Luas Volume BJ Berat (kg)
H3 72 0.012 0.000113 0.0081 7,850 63.89
Diameter 12 mm
H4 108 0.012 0.000113 0.0122 7,850 95.84

BERAT TULANGAN POLOS 159.73


.
RENCANA PENULANGAN ABUTMENT JEMBATAN MANGGADA

a Jml Panjang Tot.Pj Dia (mm) JML TLG


a 1 675 675 22
b A1 b 1 80 80 22 (900/20
+ 1) * 2
kait 2 12 24 22
JUMLAH 779.00 22.00 92.00 71,668.00

Jml Panjang Tot.Pj Dia (cm) JML TLG


b a 1 900 900 13
a A2 b 1 60 60 13 (595/25
+ 1) * 2
kait 2 6.5 13 13
JUMLAH 973.00 13.00 50.00 48,650.00

Jml Panjang Tot.Pj Dia (cm) JML TLG


b b a 1 40 40 13
a A3 b 2 60 120 13
kait 2 6.5 13 13
JUMLAH 173.00 13.00 143.00 24,739.00

Jml Panjang Tot.Pj Dia (mm) JML TLG


a 1 480 480 32
b b F1 b 2 45 90 32 900/20
+1
a kait 2 16 32 32
JUMLAH 602.00 32.00 46.00 27,692.00

Jml Panjang Tot.Pj Dia (cm) JML TLG


a a 1 60 60 32
b b F2 b 2 212 424 32 900/20
+1
kait 2 16 32 32
JUMLAH 516.00 13.00 46.00 23,736.00

Jml Panjang Tot.Pj Dia (cm) JML TLG


a F3 a 1 900 900 16
JUMLAH 900.00 16.00 25.00 22,500.00

Jml Panjang Tot.Pj Dia (cm) JML TLG


a F4 a 1 900 900 16
JUMLAH 900.00 16.00 25.00 22,500.00

Jml Panjang Tot.Pj Dia (cm) JML TLG


a 1 40 40 13
b b F5.1 b 2 55 110 13
a kait 2 6.5 13 13
JUMLAH 163.00 13.00 24.00 3,912.00

Jml Panjang Tot.Pj Dia (cm) JML TLG


a 1 40 40 13
b b F5.2 b 2 65 130 13
a kait 2 6.5 13 13
JUMLAH 183.00 13.00 24.00 4,392.00

Jml Panjang Tot.Pj Dia (cm) JML TLG


a 1 40 40 13
b b F5.3 b 2 75 150 13
a kait 2 6.5 13 13
JUMLAH 203.00 13.00 24.00 4,872.00
a Jml Panjang Tot.Pj Dia (cm) JML TLG
b a 1 110 110 22
b 1 30 30 22
c F5.3 c 1 70 70 22
kait 1 6.5 6.5 22
JUMLAH 216.50 22.00 46.00 9,959.00

a Jml Panjang Tot.Pj Dia (cm) JML TLG


b a 1 20 20 22
b 1 40 40 22
c H1 c 1 180 180 22
kait 1 11 11 22
JUMLAH 251.00 22.00 46.00 11,546.00

a Jml Panjang Tot.Pj Dia (cm) JML TLG


a 1 30 30 22
b 1 140 140 22
b H2
kait 1 11 11 22
JUMLAH 181.00 22.00 61.00 11,041.00

Jml Panjang Tot.Pj Dia (cm) JML TLG


a H3 a 1 900 900 12
JUMLAH 900.00 12.00 8.00 7,200.00

Jml Panjang Tot.Pj Dia (cm) JML TLG


a H4 a 1 900 900 12
JUMLAH 900.00 12.00 12.00 10,800.00

RENCANA PENULANGAN DINDING SAYAP


Jml Panjang Tot.Pj Dia (cm) JML TLG
a W1 a 1 795 795 16
JUMLAH 795.00 16.00 24.00 19,080.00

Jml Panjang Tot.Pj Dia (cm) JML TLG


a a 1 200 200 10
W2 kait 2 5 10 10
JUMLAH 210.00 16.00 41.00 8,610.00

Jml Panjang Tot.Pj Dia (mm) JML TLG


a 1 200 200 10
b b W3 b 2 20 40 10
a kait 2 5 10 10
JUMLAH 250.00 10.00 41.00 10,250.00

RENCANA PENULANGAN PLAT INJAK


Jml Panjang Tot.Pj Dia (cm) JML TLG
a b a 1 295 295 13
c e b 1 20 20 13
c 1 30 30 13
PI1 d 1 15 15 13
900/20+1
e 1 40 40 13
kait 1 5 5 13
d JUMLAH 405.00 13.00 46.00 18,630.00

Jml Panjang Tot.Pj Dia (cm) JML TLG


a a 1 295 295 13
PI2 kait 2 5 10 13
JUMLAH 305.00 13.00 46.00 14,030.00

Jml Panjang Tot.Pj Dia (mm) JML TLG

PI3
a a 1 890 890 13
PI3 300/20+1
JUMLAH 890.00 13.00 32.00 28,480.00

BERAT BAJA TULANGAN ULIR UNTUK KG/M'

DIAMETER D10 D13 D16 D19 D22 D25 D29 D32


Kg / M' 0.617 1.040 1.580 2.230 2.980 3.850 5.190 6.310

BERAT BAJA TULANGAN POLOS

Berat Jenis Baja Tulangan /BJ = 7.85 ton/m3


7,850 Kg/m3
0.00785 Kg/Cm3

Volume = Panjang x Luas -------------> Luas = 1/4 x π x D2

Berat Tulangan = Volume x BJ

BERAT TULANGAN ULIR


F1 F2
Diameter 32 mm
6.310 276.92 237.36 3,245.11
A1 F5.4 H1 H2
Diameter 22 mm
2.980 716.68 99.59 115.46 110.41 3,105.58
F3 F4 W1
Diameter 16 mm
1.580 225 225 190.8 1,012.46
A2 A3 F5.1 F5.2 F5.3
1.040 486.5 247.39 39.12 43.92 48.72 1,536.13
Diameter 13 mm
PI1 PI2 PI3
186.3 140.3 284.8
W2 W3
Diameter 10 mm
0.617 86.1 102.5 116.37

BERAT TULANGAN ULIR 9,015.65

BERAT TULANGAN POLOS


DIAMETER KODE Panjang Dia Luas Volume BJ Berat (kg)
H3 72 0.012 0.000113 0.0081 7,850 63.89
Diameter 12 mm
H4 108 0.012 0.000113 0.0122 7,850 95.84

BERAT TULANGAN POLOS 159.73


.
RENCANA PENULANGAN ABUTMENT JEMBATAN INOSOTA I

a Jml Panjang Tot.Pj Dia (mm) JML TLG


a 1 740 740 22
b A1 b 1 80 80 22 (900/20
+ 1) * 2
kait 2 12 24 22
JUMLAH 844.00 22.00 92.00 77,648.00

Jml Panjang Tot.Pj Dia (cm) JML TLG


b a 1 900 900 13
a A2 b 1 60 60 13 (660/25
+ 1) * 2
kait 2 6.5 13 13
JUMLAH 973.00 13.00 56.00 54,488.00

Jml Panjang Tot.Pj Dia (cm) JML TLG


b b a 1 40 40 13
a A3 b 2 60 120 13
kait 2 6.5 13 13
JUMLAH 173.00 13.00 154.00 26,642.00

Jml Panjang Tot.Pj Dia (mm) JML TLG


a 1 480 480 32
b b F1 b 2 45 90 32 900/20
+1
a kait 2 16 32 32
JUMLAH 602.00 32.00 46.00 27,692.00

Jml Panjang Tot.Pj Dia (cm) JML TLG


a a 1 60 60 32
b b F2 b 2 212 424 32 900/20
+1
kait 2 16 32 32
JUMLAH 516.00 13.00 46.00 23,736.00

Jml Panjang Tot.Pj Dia (cm) JML TLG


a F3 a 1 900 900 16
JUMLAH 900.00 16.00 25.00 22,500.00

Jml Panjang Tot.Pj Dia (cm) JML TLG


a F4 a 1 900 900 16
JUMLAH 900.00 16.00 25.00 22,500.00

Jml Panjang Tot.Pj Dia (cm) JML TLG


a 1 40 40 13
b b F5.1 b 2 55 110 13
a kait 2 6.5 13 13
JUMLAH 163.00 13.00 24.00 3,912.00

Jml Panjang Tot.Pj Dia (cm) JML TLG


a 1 40 40 13
b b F5.2 b 2 65 130 13
a kait 2 6.5 13 13
JUMLAH 183.00 13.00 24.00 4,392.00

Jml Panjang Tot.Pj Dia (cm) JML TLG


a 1 40 40 13
b b F5.3 b 2 75 150 13
a kait 2 6.5 13 13
JUMLAH 203.00 13.00 24.00 4,872.00
a Jml Panjang Tot.Pj Dia (cm) JML TLG
b a 1 110 110 22
b 1 30 30 22
c F5.3 c 1 70 70 22
kait 1 6.5 6.5 22
JUMLAH 216.50 22.00 46.00 9,959.00

a Jml Panjang Tot.Pj Dia (cm) JML TLG


b a 1 20 20 22
b 1 40 40 22
c H1 c 1 180 180 22
kait 1 11 11 22
JUMLAH 251.00 22.00 46.00 11,546.00

a Jml Panjang Tot.Pj Dia (cm) JML TLG


a 1 30 30 22
b 1 140 140 22
b H2
kait 1 11 11 22
JUMLAH 181.00 22.00 61.00 11,041.00

Jml Panjang Tot.Pj Dia (cm) JML TLG


a H3 a 1 900 900 12
JUMLAH 900.00 12.00 8.00 7,200.00

Jml Panjang Tot.Pj Dia (cm) JML TLG


a H4 a 1 900 900 12
JUMLAH 900.00 12.00 12.00 10,800.00

RENCANA PENULANGAN DINDING SAYAP


Jml Panjang Tot.Pj Dia (cm) JML TLG
a W1 a 1 860 860 16
JUMLAH 860.00 16.00 24.00 20,640.00

Jml Panjang Tot.Pj Dia (cm) JML TLG


a a 1 200 200 10
W2 kait 2 5 10 10
JUMLAH 210.00 16.00 44.00 9,240.00

Jml Panjang Tot.Pj Dia (mm) JML TLG


a 1 200 200 10
b b W3 b 2 20 40 10
a kait 2 5 10 10
JUMLAH 250.00 10.00 44.00 11,000.00

RENCANA PENULANGAN PLAT INJAK


Jml Panjang Tot.Pj Dia (cm) JML TLG
a b a 1 295 295 13
c e b 1 20 20 13
c 1 30 30 13
PI1 d 1 15 15 13
900/20+1
e 1 40 40 13
kait 1 5 5 13
d JUMLAH 405.00 13.00 46.00 18,630.00

Jml Panjang Tot.Pj Dia (cm) JML TLG


a a 1 295 295 13
PI2 kait 2 5 10 13
JUMLAH 305.00 13.00 46.00 14,030.00

Jml Panjang Tot.Pj Dia (mm) JML TLG

PI3
a a 1 890 890 13
PI3 300/20+1
JUMLAH 890.00 13.00 32.00 28,480.00

BERAT BAJA TULANGAN ULIR UNTUK KG/M'

DIAMETER D10 D13 D16 D19 D22 D25 D29 D32


Kg / M' 0.617 1.040 1.580 2.230 2.980 3.850 5.190 6.310

BERAT BAJA TULANGAN POLOS

Berat Jenis Baja Tulangan /BJ = 7.85 ton/m3


7,850 Kg/m3
0.00785 Kg/Cm3

Volume = Panjang x Luas --------------> Luas = 1/4 x π x D2

Berat Tulangan = Volume x BJ

BERAT TULANGAN ULIR


F1 F2
Diameter 32 mm
6.310 276.92 237.36 3,245.11
A1 F5.4 H1 H2
Diameter 22 mm
2.980 776.48 99.59 115.46 110.41 3,283.78
F3 F4 W1
Diameter 16 mm
1.580 225 225 206.4 1,037.11
A2 A3 F5.1 F5.2 F5.3
1.040 544.88 266.42 39.12 43.92 48.72 1,616.64
Diameter 13 mm
PI1 PI2 PI3
186.3 140.3 284.8
W2 W3
Diameter 10 mm
0.617 92.4 110 124.88

BERAT TULANGAN ULIR 9,307.52

BERAT TULANGAN POLOS


DIAMETER KODE Panjang Dia Luas Volume BJ Berat (kg)
H3 72 0.012 0.000113 0.0081 7,850 63.89
Diameter 12 mm
H4 108 0.012 0.000113 0.0122 7,850 95.84

BERAT TULANGAN POLOS 159.73


.
RENCANA PENULANGAN ABUTMENT JEMBATAN MAYAMBANGA III

a Jml Panjang Tot.Pj Dia (mm) JML TLG


a 1 660 660 22
b A1 b 1 80 80 22 (900/20
+ 1) * 2
kait 2 12 24 22
JUMLAH 764.00 22.00 92.00 70,288.00

Jml Panjang Tot.Pj Dia (cm) JML TLG


b a 1 900 900 13
a A2 b 1 60 60 13 (580/25
+ 1) * 2
kait 2 6.5 13 13
JUMLAH 973.00 13.00 50.00 48,650.00

Jml Panjang Tot.Pj Dia (cm) JML TLG


b b a 1 40 40 13
a A3 b 2 60 120 13
kait 2 6.5 13 13
JUMLAH 173.00 13.00 143.00 24,739.00

Jml Panjang Tot.Pj Dia (mm) JML TLG


a 1 480 480 32
b b F1 b 2 45 90 32 900/20
+1
a kait 2 16 32 32
JUMLAH 602.00 32.00 46.00 27,692.00

Jml Panjang Tot.Pj Dia (cm) JML TLG


a a 1 60 60 32
b b F2 b 2 212 424 32 900/20
+1
kait 2 16 32 32
JUMLAH 516.00 13.00 46.00 23,736.00

Jml Panjang Tot.Pj Dia (cm) JML TLG


a F3 a 1 900 900 16
JUMLAH 900.00 16.00 25.00 22,500.00

Jml Panjang Tot.Pj Dia (cm) JML TLG


a F4 a 1 900 900 16
JUMLAH 900.00 16.00 25.00 22,500.00

Jml Panjang Tot.Pj Dia (cm) JML TLG


a 1 40 40 13
b b F5.1 b 2 55 110 13
a kait 2 6.5 13 13
JUMLAH 163.00 13.00 24.00 3,912.00

Jml Panjang Tot.Pj Dia (cm) JML TLG


a 1 40 40 13
b b F5.2 b 2 65 130 13
a kait 2 6.5 13 13
JUMLAH 183.00 13.00 24.00 4,392.00

Jml Panjang Tot.Pj Dia (cm) JML TLG


a 1 40 40 13
b b F5.3 b 2 75 150 13
a kait 2 6.5 13 13
JUMLAH 203.00 13.00 24.00 4,872.00
a Jml Panjang Tot.Pj Dia (cm) JML TLG
b a 1 110 110 22
b 1 30 30 22
c F5.3 c 1 70 70 22
kait 1 6.5 6.5 22
JUMLAH 216.50 22.00 46.00 9,959.00

a Jml Panjang Tot.Pj Dia (cm) JML TLG


b a 1 20 20 22
b 1 40 40 22
c H1 c 1 180 180 22
kait 1 11 11 22
JUMLAH 251.00 22.00 46.00 11,546.00

a Jml Panjang Tot.Pj Dia (cm) JML TLG


a 1 30 30 22
b 1 140 140 22
b H2
kait 1 11 11 22
JUMLAH 181.00 22.00 61.00 11,041.00

Jml Panjang Tot.Pj Dia (cm) JML TLG


a H3 a 1 900 900 12
JUMLAH 900.00 12.00 8.00 7,200.00

Jml Panjang Tot.Pj Dia (cm) JML TLG


a H4 a 1 900 900 12
JUMLAH 900.00 12.00 12.00 10,800.00

RENCANA PENULANGAN DINDING SAYAP


Jml Panjang Tot.Pj Dia (cm) JML TLG
a W1 a 1 780 780 16
JUMLAH 780.00 16.00 24.00 18,720.00

Jml Panjang Tot.Pj Dia (cm) JML TLG


a a 1 200 200 10
W2 kait 2 5 10 10
JUMLAH 210.00 16.00 40.00 8,400.00

Jml Panjang Tot.Pj Dia (mm) JML TLG


a 1 200 200 10
b b W3 b 2 20 40 10
a kait 2 5 10 10
JUMLAH 250.00 10.00 40.00 10,000.00

RENCANA PENULANGAN PLAT INJAK


Jml Panjang Tot.Pj Dia (cm) JML TLG
a b a 1 295 295 13
c e b 1 20 20 13
c 1 30 30 13
PI1 d 1 15 15 13
900/20+1
e 1 40 40 13
kait 1 5 5 13
d JUMLAH 405.00 13.00 46.00 18,630.00

Jml Panjang Tot.Pj Dia (cm) JML TLG


a a 1 295 295 13
PI2 kait 2 5 10 13
JUMLAH 305.00 13.00 46.00 14,030.00

Jml Panjang Tot.Pj Dia (mm) JML TLG

PI3
a a 1 890 890 13
PI3 300/20+1
JUMLAH 890.00 13.00 32.00 28,480.00

BERAT BAJA TULANGAN ULIR UNTUK KG/M'

DIAMETER D10 D13 D16 D19 D22 D25 D29 D32


Kg / M' 0.617 1.040 1.580 2.230 2.980 3.850 5.190 6.310

BERAT BAJA TULANGAN POLOS

Berat Jenis Baja Tulangan /BJ = 7.85 ton/m3


7,850 Kg/m3
0.00785 Kg/Cm3

Volume = Panjang x Luas -------------> Luas = 1/4 x π x D2

Berat Tulangan = Volume x BJ

BERAT TULANGAN ULIR


F1 F2
Diameter 32 mm
6.310 276.92 237.36 3,245.11
A1 F5.4 H1 H2
Diameter 22 mm
2.980 702.88 99.59 115.46 110.41 3,064.45
F3 F4 W1
Diameter 16 mm
1.580 225 225 187.2 1,006.78
A2 A3 F5.1 F5.2 F5.3
1.040 486.5 247.39 39.12 43.92 48.72 1,536.13
Diameter 13 mm
PI1 PI2 PI3
186.3 140.3 284.8
W2 W3
Diameter 10 mm
0.617 84 100 113.53

BERAT TULANGAN ULIR 8,966.00

BERAT TULANGAN POLOS


DIAMETER KODE Panjang Dia Luas Volume BJ Berat (kg)
H3 72 0.012 0.000113 0.0081 7,850 63.89
Diameter 12 mm
H4 108 0.012 0.000113 0.0122 7,850 95.84

BERAT TULANGAN POLOS 159.73


.
BAR BENDING DIAGRAM

a a a a

b b b
b
A
C D
B

b c c
a a a
b
b
a b b
c
c

E F G H
I
BERAT BAJA TULANGAN ULIR UNTUK KG/M'

DIAMETER D10 D13 D16 D19 D22 D25 D29 D32


Kg / M' 0.617 1.040 1.580 2.230 2.980 3.850 5.190 6.310
DEVISI 3 - Pekerjaan tanah
3.1.(4) Galian Struktur dengan kedalaman 2-4 meter
3.1.(5) Galian Struktur dengan kedalaman 4-6 meter

JEMBATAN
P L T JUMLAH abudment
BINEHA V 9.10 4.00 5.00 3
SINOMBAYUGA I 9.10 4.00 4.00 2
MANGGADAA 9.10 4.00 3.00 2
INOSOTA I 9.10 4.00 5.00 2
MAYAMBANGA III 9.10 4.00 4.00 2
MAMALIA II 9.10 4.00 5.00 3

VOLUME

PERHITUNGAN VOLUME PADA PONDASI SUMURAN

JEMBATAN
Tinggi diameter Jumlah
BINEHA V 5.00 4.00 6.00
SINOMBAYUGA I 4.00 4.00 4.00
MANGGADAA 3.00 4.00 4.00
INOSOTA I 5.00 4.00 4.00
MAYAMBANGA III 4.00 4.00 4.00
MAMALIA II 5.00 4.00 6.00

PERHITUNGAN VOLUME timbunan

JEMBATAN
BINEHA V
SINOMBAYUGA I
MANGGADAA
INOSOTA I
MAYAMBANGA III
MAMALIA II

VOLUME

PERHITUNGAN VOLUME timbunan pilihan


Dinding Sayap
JEMBATAN
t l p banyaknya jumlah VOL
BINEHA V :
1. Lantai Jembtan 0.20 7.00 15.00 1.00 2.00 42.00
2. Gelagar Memanjang 0.85 0.45 15.00 6.00 2.00 68.85
3. Gelagar Melintang 0.50 0.30 6.25 5.00 2.00 9.38

SINOMBAYUGA I 3.00 4.00 4.00


MANGGADAA 3.00 4.00 4.00
INOSOTA I 3.00 4.00 4.00
MAYAMBANGA III 3.00 4.00 4.00
MAMALIA II 3.00 4.00 4.00
VOLUME
546.00 Kedalaman 4 s/d 6
291.20 Kedalaman 4 s/d 6
218.40 Kedalaman 2 s/d 4
364.00 Kedalaman 4 s/d 6
291.20 Kedalaman 4 s/d 6
546.00 Kedalaman 4 s/d 6

2256.80

VOLUME
377.14
201.14
150.86
251.43
201.14
377.14

1558.86

VOLUME
168.86
90.06
67.54
112.57
90.06
168.86

697.94
Dinding Sayap
VOLUME

120.23

12.57
12.57
12.57
12.57
12.57

183.08
Kedalaman 4 s/d 6
Kedalaman 4 s/d 6
Kedalaman 2 s/d 4
Kedalaman 4 s/d 6
Kedalaman 4 s/d 6
Kedalaman 4 s/d 6
R.E.F Ø DIMENSI TULANGAN PANJANG BERAT BERAT
NO. ( mm ) a b c d TOTAL SATUAN JUMLAH ( kg )
(Cm) (Cm) (Cm) (Cm) (Cm) (kg/m)
KET.
DAFTAR PERHITUNGAN KUANTITAS PER JEMBATAN
MATA SA BINEHA V MYBGA III MMLIA II SNMBYG I MGGDAA INST I TOTAL
KETERANGAN
PEMBA URAIAN TU PRAKIRA PRAKIRA PRAKIRA PRAKIRA PRAKIRA PRAKIRA PERKIRAAN
YARAN AN KUANT. KUANT. KUANT. KUANT. KUANT. KUANT. KUANTITAS
a b c d e f g h I h

BAB. I UMUM
1.2 Mobilisasi & Demobilisasi LS 1.00 1.00 1.00 1.00 1.00 1.00
1.8 Pemeliharaan Arus Lalu Lintas LS 1.00 1.00 1.00 1.00 1.00 1.00
1.9 Rekayasa Lapangan LS 1.00 1.00 1.00 1.00 1.00 1.00
BAB. II DRAINASE
2.1 Pekerjaan Galian Untuk Selokan Drainase & Saluran Air M3
2.2 Pekerjaan Pasangan Batu dengan Mortar M3
BAB. III PEKERJAAN TANAH
3.1 (1) Galian Biasa M3
3.1 (2) Galian Padas/Batuan M3
3.1 (3) Galian struktur dengan kedalaman 0 - 2 M M3
3.1 (4) Galian struktur dengan kedalaman 2 - 4 M M3 218.40 218.40
3.1 (5) Galian struktur dengan kedalaman 4 - 6 M3 546.00 291.20 546.00 291.20 364.00 2,038.40
3.2 (1) Timbunan Biasa M3 168.86 90.06 168.86 90.06 67.54 112.57 697.94
3.2 (2) Timbunan Pilihan M3 0.00
3.3 Penyiapan Badan Jalan M2 105.00 105.00 105.00 105.00 105.00 105.00 630.00
BAB. V PERKERASAN BERBUTIR
5.1 (1) Lapis Pondasi Agregat Kelas A M3 21.00 21.00 21.00 21.00 21.00 21.00 126.00
5.1 (2) Lapis Pondasi Agregat Kelas B M3 21.00 21.00 21.00 21.00 21.00 21.00 126.00
BAB. VI PERKERASAN ASPAL
6.1(1) Lapis Resap Pengikat Liter 105.00 105.00 105.00 105.00 105.00 105.00 630.00
6.1(2) Lapis Perekat Liter 97.86 97.86 75.18 117.18 117.18 117.18 622.44
6.3(3) Lataston-lapis aus (HRS-WC) t = 3 Cm M2 326.20 326.20 250.60 390.60 390.60 390.60 2,074.80
6.3(4) Lataston-lapis Pondasi (HRS-Base) M3 3.68 3.68 3.68 3.68 3.68 3.68 22.05
BAB. VII STRUKTUR
7.1 (3) Beton K-350 M3 133.59 133.59 102.96 59.39 59.39 59.39 548.31 Plat Lantai & Injakan
7.1 (5) Beton K-250 M3 415.01 456.62 294.06 468.76 479.42 502.53 2,616.40 Struktur Bangunan Bawah dan dinding sayap
7.1 (6) Beton K-175 M3 20.54 20.54 13.52 20.40 20.40 20.40 115.80 Trotoar
7.1 (7) Beton Siklop K-175 M3 377.14 301.71 251.43 201.14 150.86 276.57 1,558.86 Isi Sumuran
7.1 (8) Beton K-125 M3 35.30 35.30 23.53 23.53 23.53 23.53 164.72 Lantai kerja
7.3 (1) Baja tulangan U 24 polos Kg 25,438.00 25,438.00 20,615.00 Balok, Plat Lantai
7.3 (2) Baja tulangan U 32 polos Kg
7.3 (3) Baja tulangan D 32 Ulir Kg
7.3 (4) Baja tulangan D 39 Ulir -----> U42 Kg 11,631.00 11,631.00 11,631.00 Plat Lantai
7.3 (5) Baja tulangan D 48 Ulir Kg
7.5 (1) Pemasangan Jembatan Rangka Baja Kg 98,563.00 98,563.00 98,563.00 Rangka B-40
7.5 (2) Pengangkutan Material Jembatan Kg 98,563.00 98,563.00 98,563.00 Rangka B-40
7.7 (4) Penyediaan dinding sumuran silinder dia. 400 Cm M1 30.00 24.00 20.00 16.00 12.00 22.00
7.7 (8) Penurunan dinding sumuran silinder dia 400 Cm M1 30.00 24.00 20.00 16.00 12.00 22.00
7.9 Pasangan batu M3
7.11 Expation Join M1
7.12 Perletakan Elastomerik Buah
7.13 Sandaran Jembatan Baja M1 126.40
7.14 Papan nama jembatan Buah 1.00 1.00 1.00 1.00 1.00 1.00
7.15 (1) Pembongkaran Pasangan Batu M3
7.15 (2) Pembongkaran Beton M3 140.84 127.44 130.61 122.22 128.59 143.68
7.15 (5) Pembongkaran rangka baja M2 214.50 214.50 210.00 214.50 214.50 420.00
7.15 (6) Pembongkaran Balok Baja (Steel Stringers) M1
7.15 (7) Pembongkaran lantai jembatan kayu M2 115.50 115.50 115.50 180.00
7.15 (8) Pembongkaran Jembatan kayu M2
BAB. VIII PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR
8.4 (2) Marka Jalan termoplastik M2
8.4 (5) Patok Pengarah Buah
KETERANGAN

Gambar Standar

Desain 5.3066 26.533 106.132 5.2


Gambar Standar
Gambar Standar

Gambar Standar
Gambar Standar

Gambar Standar
MATA SA BINEHA V SINOMBAYUGA I MANGGADAA INOSOTA I MAYAMBANGA III MAMALIA II TOTAL
PEMBA URAIAN TU PERKIRAAN PERKIRAAN PERKIRAAN PERKIRAAN PERKIRAAN PERKIRAAN PERKIRAAN
YARAN AN KUANTITAS KUANTITAS KUANTITAS KUANTITAS KUANTITAS KUANTITAS KUANTITAS
a b c d e f g h I h

BAB. I UMUM

1.2 Mobilisasi Ls

BAB. II DRAINASE

2.1 Pekerjaan Galian Untuk Selokan M3


Drainase Dan Saluran Air
2.2 Pekerjaan Pasangan Batu Dengan Mortar M3
2.3 (1) Gorong2 Pipa Beton Bertulang Dia dalam < 45 Cm M1
2.3 (2) Gorong2 Pipa Beton Bertulang Dia dalam 45 - 75 Cm M1
2.3 (3) Gorong2 Pipa Beton Bertulang Dia dalam 75 - 120 Cm M1
2.3 (4) Gorong-gorong Pipa Baja Bergelombang Ton
2.3 (5) Gorong-Gorong Pipa Beton tanpa Tulangan M1
Dia. Dalam 20 cm
2.3 (6) Gorong-Gorong Pipa Beton tanpa Tulangan M1
Dia. Dalam 25 cm
2.3 (7) Gorong-Gorong Pipa Beton tanpa Tulangan M1
Dia. Dalam 30 cm
2.4 (1) Timbunan Porous atau bahan Penyaring M3
2.4 (2) Anyaman Filter Plastik M2
2.4 (3) Pipa berlubang banyak (Perforated Pipe) M1
Untuk pekerjaan drainase bawah permukaan

BAB. III PEKERJAAN TANAH

3.1 (1) Galian Biasa M3


3.1 (2) Galian Padas/Batuan M3
3.1 (3) Galian struktur dengan kedalaman 0 - 2 M M3
3.1 (4) Galian struktur dengan kedalaman 2 - 4 M M3
3.1 (5) Galian struktur dengan kedalaman 4 - 6 M M3
3.1 (6) Galian Perkerasan beraspal dengan Cold Milling Machine M3
3.1 (7) Galian Perkerasan beraspal tanpa Cold Milling Machine M3
3.1 (8) Biaya tambahan untuk pengangkutan Bahan Galian M3/KM
yang melebihi 5 KM
3.2 (1) Timbunan Biasa M3
3.2 (2) Timbunan Pilihan M3
3.2 (3) Timbunan Pilihan diatas tanah rawa M3
(diukur diatas bak truck)
3.3 Penyiapan Badan Jalan M2
MATA SA BINEHA V SINOMBAYUGA I MANGGADAA INOSOTA I MAYAMBANGA III MAMALIA II TOTAL
PEMBA URAIAN TU PERKIRAAN PERKIRAAN PERKIRAAN PERKIRAAN PERKIRAAN PERKIRAAN PERKIRAAN
YARAN AN KUANTITAS KUANTITAS KUANTITAS KUANTITAS KUANTITAS KUANTITAS KUANTITAS
a b c d e f g h I h

BAB. IV PELEBARAN PERKERASAN


DAN BAHU JALAN

4.2 (1) Lapis Pondasi Agregat Kelas A M3


4.2 (2) Lapis Pondasi Agregat Kelas B M3
4.2 (3) Lapis Pondasi semen tanah M3
4.2 (4) Semen untuk lapis pondasi semen tanah Ton
4.2 (5) Laburan asphal satu lapis (BURTU) M2
4.2 (6) Bahan Aspal Untuk Pekerjaan Pelaburan Liter
4.2 (7) Lapis Resap Pengikat Liter

BAB. V PERKERASAN BERBUTIR

5.1 (1) Lapis Pondasi Agregat Kelas A M3


5.1 (2) Lapis Pondasi Agregat Kelas B M3
5.2 (1) Lapis Pondasi Kelas C M3
5.4 (1) Semen Untuk lapis Pondasi semen tanah Ton
5.4 (2) Lapis Pondasi semen Tanah M3

BAB. VI PERKERASAN ASPAL

6.1(1) Lapis Resap Pengikat Liter


6.1(2) Lapis Perekat Liter
6.2(1) Agregat Penutup Burtu M2
6.2(2) Agregat Penutup Burda M2
6.2(3) Bahan Aspal Untuk Pekerjaan Pelaburan Liter
6.3(1) Latasir (SS) Kelas A M2
6.3(2) Latasir (SS) Kelas B M2
6.3(3) Lataston-lapis aus (HRS-WC) M2 221.20 221.20 145.60
6.3(4) Lataston-lapis Pondasi (HRS-Base) M3
6.3(5) Laston-lapis aus (AC-WC) M2
6.3(6) Laston-lapis pengikat (AC-BC) M3
6.3(7) Laston-lapis pondasi (AC-Base) M3
6.4(1) Lasbutag M2
6.4(2) Latasbusir Kelas A M2
6.4(3) Latasbusir Kelas B M2
6.4(4) Bitumen Asbuton Ton
6.4(5) Bitumen bahan peremaja Ton
6.4(6) Bahan Anti-Stripping Liter
6.5 Asphal campuran dingin untuk pelapisan kembali
6.6 Lapis Penetrasi Macadam M2