JEMBATAN BENTANG Hb
NO. KETERANGAN
EXISTING RENCANA EXISTING RENCANA Existing
1 NUNUKA BINEHA V 33 30 Bongkar 2 Abutment 4.05
2 SINOMBAYUGA I SINOMBAYUGA I 33 40 Bongkar 2 Abutment 4.45
3 SINOMBAYUGA II MANGGADAA 33 40 Bongkar 2 Abutment 4.70
4 INOSOTA 1 INOSOTA I 40 40 Bongkar 2 Abutment 5.20
5 MAYAMBANGA III MAYAMBANGA III 33 30 Bongkar 2 Abutment 4.60
6 BAKIDA I MAMALIA II 20 20 Bongkar 2 Abutment 3.45
TOTAL 192 200
T1
X2 Hk
X1
H1
H2
Ht
Hb
HF2
HF1
40 M'
33 M' 3.5
Luas 1 = T1 x Hk
Luas 2 = T2 x Ht
Luas 3 = 1/2 ( H1 + H2 ) x X1
Luas 4 = 1/2 ( H1 + H2 ) x X1
T1 Hk T2 Ht H1 H2 X1 X2 Luas
BINEHA V 0.40 1.00 0.80 4.05 0.40 0.40 0.50 0.50 4.04
SINOMBAYUGA I 0.40 1.00 0.80 4.45 0.40 0.40 0.50 0.50 4.36
MANGGADAA 0.40 1.00 0.80 4.70 0.40 0.40 0.50 0.50 4.56
INOSOTA I 0.40 1.00 0.80 5.20 0.40 0.40 0.50 0.50 4.96
MAYAMBANGA III 0.40 1.00 0.80 4.60 0.40 0.40 0.50 0.50 4.48
MAMALIA II 0.40 1.00 0.80 3.45 0.40 0.40 0.50 0.50 3.56
SINOMBAYUGA I 4.36 7.00 61.04 0.70 0.30 5.00 0.80 61.18 122.22
MANGGADAA 4.56 7.20 65.66 0.70 0.30 5.00 0.80 62.93 128.59
INOSOTA I 4.96 7.70 76.38 0.70 0.30 5.00 0.80 67.30 143.68
MAYAMBANGA III 4.48 7.20 64.51 0.70 0.30 5.00 0.80 62.93 127.44
MAMALIA II 3.56 7.10 50.55 0.70 0.30 5.00 0.80 62.05 112.61
JEMBATAN BENTANG Hb
NO. KET.
EXISTING RENCANA EXISTING RENCANA Existing
1 NUNUKA BINEHA V 33 30 4.05
b6
b7 b5
h8 I
h7
h6
h5
h1 h4
h3
h2
b2 b4
b3
b1
PERHITUNGAN VOLUME BETON PADA ABUTMENT (K-250)
UKURAN
JEMBATAN
b1 b2 b3 b4 b5 b6 b7
BINEHA V 6.00 2.55 0.90 2.55 0.80 0.30 0.20
BINEHA V (PILAR) 6.00 2.55 0.90 2.55 0.85 0.30 0.85
SINOMBAYUGA I 6.00 2.25 1.50 2.25 1.40 0.50 0.35
MANGGADAA 6.00 2.25 1.50 2.25 1.40 0.50 0.35
INOSOTA I 6.00 2.25 1.50 2.25 1.40 0.50 0.35
MAYAMBANGA III 6.00 2.50 1.00 2.50 0.80 0.30 0.20
MAYAMBANGA III (PILAR) 6.00 2.55 0.90 2.55 0.85 0.30 0.85
MAMALIA II 6.00 2.50 1.00 2.50 0.85 0.30 0.20
PERHITUNGAN LUAS
LUAS I = b6 x h8
LUAS II = (b6+b7) x h7
LUAS III = (b5+b6+b7)) x h6
LUAS IV = 1/2 x ((b5+b6+b7)-b3)) x h5
LUAS V = b3 x (h4+h5)
LUAS VI = (1/2 x (b1+b3)) x h3
LUAS VII = b1 x h2
ABUTMENT
JEMBATAN
Kaki Badan Kepala
BINEHA V #REF! #REF! 0.00
SINOMBAYUGA I #REF! #REF! 452.90
MANGGADAA #REF! #REF! 462.89
INOSOTA I #REF! #REF! 484.53
MAYAMBANGA III #REF! #REF! 0.00
MAMALIA II #REF! #REF! 280.22
VOLUME
SINOMBAYUGA I
Diatas Spandeck 0.12 7.00 40.80 1.00 1.00 34.27
Bersama Spandek 0.08 7.00 40.80 1.00 1.00 18.28
MANGGADAA
Diatas Spandeck 0.12 7.00 40.80 1.00 1.00 34.27
Bersama Spandek 0.08 7.00 40.80 1.00 1.00 18.28
INOSOTA I
Diatas Spandeck 0.12 7.00 40.80 1.00 1.00 34.27
Bersama Spandek 0.08 7.00 40.80 1.00 1.00 18.28
MAYAMBANGA III :
1. Lantai Jembtan 0.20 7.00 15.80 1.00 2.00 44.24
2. Gelagar Memanjang 0.85 0.45 15.80 6.00 2.00 72.52
3. Gelagar Melintang 0.50 0.30 6.25 5.00 2.00 9.38
MAMALIA II :
1. Lantai Jembtan 0.20 7.00 20.80 1.00 1.00 29.12
2. Gelagar Memanjang 20.80 6.00 1.00 58.22 Luas
3. Gelagar Melintang 0.80 0.30 7.00 5.00 1.00 8.40
JEMBATAN
t l p banyaknya jumlah
BINEHA V :
1. Dibawah Pond. Sumuran 0.10 4.20 11.10 1.00 3.00
2. Dibawah Abudment 0.10 6.40 11.10 1.00 3.00
SINOMBAYUGA I
1. Dibawah Pond. Sumuran 0.10 4.20 11.10 1.00 2.00
2. Dibawah Abudment 0.10 6.40 11.10 1.00 2.00
MANGGADAA
1. Dibawah Pond. Sumuran 0.10 4.20 11.10 1.00 2.00
2. Dibawah Abudment 0.10 6.40 11.10 1.00 2.00
INOSOTA I
1. Dibawah Pond. Sumuran 0.10 4.20 11.10 1.00 2.00
2. Dibawah Abudment 0.10 6.40 11.10 1.00 2.00
MAYAMBANGA III
1. Dibawah Pond. Sumuran 0.10 4.20 11.10 1.00 3.00
2. Dibawah Abudment 0.10 6.40 11.10 1.00 3.00
MAMALIA II
1. Dibawah Pond. Sumuran 0.10 4.20 11.10 1.00 2.00
2. Dibawah Abudment 0.10 6.40 11.10 1.00 2.00
Volume
LEBAR VOLUME
TOTAL 2 ABUTM
11.925 23.850 11.1 264.735
12.170 12.170 11.1 135.087 399.82
20.401 40.802 11.1 452.8967 452.90
20.851 41.702 11.1 462.8867 462.89
21.826 43.652 11.1 484.5317 484.53
13.170 26.340 11.1 292.374
13.338 13.338 11.1 148.0463 440.42
12.623 25.245 11.1 280.2195 280.22
ABUTMENT Volume
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Dimensi
VOLUME
15.19
15.86
16.54
18.00
16.20
13.84
95.63
Dimensi
VOLUME
6.84
6.84
6.84
6.84
6.84
6.84
41.04
82.08
Dimensi
VOLUME
377.14
201.14
150.86
276.57
301.71
251.43
1558.86
Dinding Sayap
VOLUME
126.14
52.55
52.55
52.55
126.14
Khusus Balok memanjang Jembatan Mamalia II :
b1 b2 b3 h1 h2 h3 h4
0.56 0.3 0.4 0.35 0.1 0.7 0.05
I II III IV Total 95.74
0.196 0.043 0.21 0.0175 0.4665
Dinding Sayap
VOLUME
20.54
20.40
20.40
20.40
20.54
13.52
115.80
VOLUME
vol
13.99
21.31 35.30
9.32
14.21 23.53
9.32
14.21 23.53
9.32
14.21 23.53
13.99
21.31 35.30
9.32
14.21 23.53
164.72
Dinding Sayap
VOLUME
Luas t Jumlah
0.17 0.10 36.00 0.62
1.61
No Uraian Mutu Beton
K-350 K-250 K-175
1 Bineha V
a. Lantai Jembatan 126.14
a.1. Tiang sandaran 0.62
b. Plat Injakan 6.84
c. Abudment + Pier 399.82
d. Dinding Sayap 15.19
e. Trotoir / sumuran 20.54
f. Lantai Kerja
133.59 415.01 20.54
2 Mayembanga III
a. Lantai Jembatan 126.14
a.1. Tiang sandaran 0.62
b. Plat Injakan 6.84
c. Abudment + Pier 440.42
d. Dinding Sayap 16.20
e. Trotoir / sumuran 20.54
f. Lantai Kerja
133.59 456.62 20.54
3 Mamalia II
a. Lantai Jembatan 95.74
a.1. Tiang sandaran 0.38
b. Plat Injakan 6.84
c. Abudment + Pier 280.22
d. Dinding Sayap 13.84
e. Trotoir / sumuran 13.52
f. Lantai Kerja
102.96 294.06 13.52
4 Sinombayuga I
a. Lantai Jembatan 52.55
b. Plat Injakan 6.84
c. Abudment + Pier 452.90
d. Dinding Sayap 15.86
e. Trotoir / sumuran 20.40
f. Lantai Kerja
59.39 468.76 20.40
5 Manggadaa
a. Lantai Jembatan 52.55
b. Plat Injakan 6.84
c. Abudment + Pier 462.89
d. Dinding Sayap 16.54
e. Trotoir / sumuran 20.40
f. Lantai Kerja
59.39 479.42 20.40
6 Inosota I
a. Lantai Jembatan 52.55
b. Plat Injakan 6.84
c. Abudment + Pier 484.53
d. Dinding Sayap 18.00
e. Trotoir / sumuran 20.40
f. Lantai Kerja
59.39 502.53 20.40
Cyclop K-175 K-125
377.14
35.30
377.14 35.30
301.71
35.30
301.71 35.30
251.43
23.53
251.43 23.53
201.14
23.53
201.14 23.53
150.86
23.53
150.86 23.53
276.57
23.53
276.57 23.53
RENCANA PENULANGAN ABUTMENT JEMBATAN MAMALIA
PI3
a a 1 890 890 13
PI3 300/20+1
JUMLAH 890.00 13.00 32.00 28,480.00
PI3
a a 1 890 890 13
PI3 300/20+1
JUMLAH 890.00 13.00 32.00 28,480.00
PI3
a a 1 890 890 13
PI3 300/20+1
JUMLAH 890.00 13.00 32.00 28,480.00
PI3
a a 1 890 890 13
PI3 300/20+1
JUMLAH 890.00 13.00 32.00 28,480.00
PI3
a a 1 890 890 13
PI3 300/20+1
JUMLAH 890.00 13.00 32.00 28,480.00
PI3
a a 1 890 890 13
PI3 300/20+1
JUMLAH 890.00 13.00 32.00 28,480.00
a a a a
b b b
b
A
C D
B
b c c
a a a
b
b
a b b
c
c
E F G H
I
BERAT BAJA TULANGAN ULIR UNTUK KG/M'
JEMBATAN
P L T JUMLAH abudment
BINEHA V 9.10 4.00 5.00 3
SINOMBAYUGA I 9.10 4.00 4.00 2
MANGGADAA 9.10 4.00 3.00 2
INOSOTA I 9.10 4.00 5.00 2
MAYAMBANGA III 9.10 4.00 4.00 2
MAMALIA II 9.10 4.00 5.00 3
VOLUME
JEMBATAN
Tinggi diameter Jumlah
BINEHA V 5.00 4.00 6.00
SINOMBAYUGA I 4.00 4.00 4.00
MANGGADAA 3.00 4.00 4.00
INOSOTA I 5.00 4.00 4.00
MAYAMBANGA III 4.00 4.00 4.00
MAMALIA II 5.00 4.00 6.00
JEMBATAN
BINEHA V
SINOMBAYUGA I
MANGGADAA
INOSOTA I
MAYAMBANGA III
MAMALIA II
VOLUME
2256.80
VOLUME
377.14
201.14
150.86
251.43
201.14
377.14
1558.86
VOLUME
168.86
90.06
67.54
112.57
90.06
168.86
697.94
Dinding Sayap
VOLUME
120.23
12.57
12.57
12.57
12.57
12.57
183.08
Kedalaman 4 s/d 6
Kedalaman 4 s/d 6
Kedalaman 2 s/d 4
Kedalaman 4 s/d 6
Kedalaman 4 s/d 6
Kedalaman 4 s/d 6
R.E.F Ø DIMENSI TULANGAN PANJANG BERAT BERAT
NO. ( mm ) a b c d TOTAL SATUAN JUMLAH ( kg )
(Cm) (Cm) (Cm) (Cm) (Cm) (kg/m)
KET.
DAFTAR PERHITUNGAN KUANTITAS PER JEMBATAN
MATA SA BINEHA V MYBGA III MMLIA II SNMBYG I MGGDAA INST I TOTAL
KETERANGAN
PEMBA URAIAN TU PRAKIRA PRAKIRA PRAKIRA PRAKIRA PRAKIRA PRAKIRA PERKIRAAN
YARAN AN KUANT. KUANT. KUANT. KUANT. KUANT. KUANT. KUANTITAS
a b c d e f g h I h
BAB. I UMUM
1.2 Mobilisasi & Demobilisasi LS 1.00 1.00 1.00 1.00 1.00 1.00
1.8 Pemeliharaan Arus Lalu Lintas LS 1.00 1.00 1.00 1.00 1.00 1.00
1.9 Rekayasa Lapangan LS 1.00 1.00 1.00 1.00 1.00 1.00
BAB. II DRAINASE
2.1 Pekerjaan Galian Untuk Selokan Drainase & Saluran Air M3
2.2 Pekerjaan Pasangan Batu dengan Mortar M3
BAB. III PEKERJAAN TANAH
3.1 (1) Galian Biasa M3
3.1 (2) Galian Padas/Batuan M3
3.1 (3) Galian struktur dengan kedalaman 0 - 2 M M3
3.1 (4) Galian struktur dengan kedalaman 2 - 4 M M3 218.40 218.40
3.1 (5) Galian struktur dengan kedalaman 4 - 6 M3 546.00 291.20 546.00 291.20 364.00 2,038.40
3.2 (1) Timbunan Biasa M3 168.86 90.06 168.86 90.06 67.54 112.57 697.94
3.2 (2) Timbunan Pilihan M3 0.00
3.3 Penyiapan Badan Jalan M2 105.00 105.00 105.00 105.00 105.00 105.00 630.00
BAB. V PERKERASAN BERBUTIR
5.1 (1) Lapis Pondasi Agregat Kelas A M3 21.00 21.00 21.00 21.00 21.00 21.00 126.00
5.1 (2) Lapis Pondasi Agregat Kelas B M3 21.00 21.00 21.00 21.00 21.00 21.00 126.00
BAB. VI PERKERASAN ASPAL
6.1(1) Lapis Resap Pengikat Liter 105.00 105.00 105.00 105.00 105.00 105.00 630.00
6.1(2) Lapis Perekat Liter 97.86 97.86 75.18 117.18 117.18 117.18 622.44
6.3(3) Lataston-lapis aus (HRS-WC) t = 3 Cm M2 326.20 326.20 250.60 390.60 390.60 390.60 2,074.80
6.3(4) Lataston-lapis Pondasi (HRS-Base) M3 3.68 3.68 3.68 3.68 3.68 3.68 22.05
BAB. VII STRUKTUR
7.1 (3) Beton K-350 M3 133.59 133.59 102.96 59.39 59.39 59.39 548.31 Plat Lantai & Injakan
7.1 (5) Beton K-250 M3 415.01 456.62 294.06 468.76 479.42 502.53 2,616.40 Struktur Bangunan Bawah dan dinding sayap
7.1 (6) Beton K-175 M3 20.54 20.54 13.52 20.40 20.40 20.40 115.80 Trotoar
7.1 (7) Beton Siklop K-175 M3 377.14 301.71 251.43 201.14 150.86 276.57 1,558.86 Isi Sumuran
7.1 (8) Beton K-125 M3 35.30 35.30 23.53 23.53 23.53 23.53 164.72 Lantai kerja
7.3 (1) Baja tulangan U 24 polos Kg 25,438.00 25,438.00 20,615.00 Balok, Plat Lantai
7.3 (2) Baja tulangan U 32 polos Kg
7.3 (3) Baja tulangan D 32 Ulir Kg
7.3 (4) Baja tulangan D 39 Ulir -----> U42 Kg 11,631.00 11,631.00 11,631.00 Plat Lantai
7.3 (5) Baja tulangan D 48 Ulir Kg
7.5 (1) Pemasangan Jembatan Rangka Baja Kg 98,563.00 98,563.00 98,563.00 Rangka B-40
7.5 (2) Pengangkutan Material Jembatan Kg 98,563.00 98,563.00 98,563.00 Rangka B-40
7.7 (4) Penyediaan dinding sumuran silinder dia. 400 Cm M1 30.00 24.00 20.00 16.00 12.00 22.00
7.7 (8) Penurunan dinding sumuran silinder dia 400 Cm M1 30.00 24.00 20.00 16.00 12.00 22.00
7.9 Pasangan batu M3
7.11 Expation Join M1
7.12 Perletakan Elastomerik Buah
7.13 Sandaran Jembatan Baja M1 126.40
7.14 Papan nama jembatan Buah 1.00 1.00 1.00 1.00 1.00 1.00
7.15 (1) Pembongkaran Pasangan Batu M3
7.15 (2) Pembongkaran Beton M3 140.84 127.44 130.61 122.22 128.59 143.68
7.15 (5) Pembongkaran rangka baja M2 214.50 214.50 210.00 214.50 214.50 420.00
7.15 (6) Pembongkaran Balok Baja (Steel Stringers) M1
7.15 (7) Pembongkaran lantai jembatan kayu M2 115.50 115.50 115.50 180.00
7.15 (8) Pembongkaran Jembatan kayu M2
BAB. VIII PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR
8.4 (2) Marka Jalan termoplastik M2
8.4 (5) Patok Pengarah Buah
KETERANGAN
Gambar Standar
Gambar Standar
Gambar Standar
Gambar Standar
MATA SA BINEHA V SINOMBAYUGA I MANGGADAA INOSOTA I MAYAMBANGA III MAMALIA II TOTAL
PEMBA URAIAN TU PERKIRAAN PERKIRAAN PERKIRAAN PERKIRAAN PERKIRAAN PERKIRAAN PERKIRAAN
YARAN AN KUANTITAS KUANTITAS KUANTITAS KUANTITAS KUANTITAS KUANTITAS KUANTITAS
a b c d e f g h I h
BAB. I UMUM
1.2 Mobilisasi Ls
BAB. II DRAINASE