Anda di halaman 1dari 52

make a difference

Choosing
Us EMPOWERING GROWTH

INFRASTRUCTURE PROJECTS

SALES & SERVICE

HIRE-LEASE-RENTAL

NITYANAND INFRASTRUCTURE LIMITED


NITYANAND INFRASTRUCTURE LIMITED
NITYANAND

COMPANY

MACHINERY, EQUIPMENT & PROJECTS

WORK DONE CERTIFICATES


NITYANAND INFRASTRUCTURE LIMITED

INDEX

ABOUT US
GENERAL DETAILS
CERTIFICATES - GENERAL
ROC
ISO CERTIFICATE- 9001:2000
Quality Policy
Service Tax Certificate
PF Registration Certificates
PF Registration Certificates
Profession Tax Registration Certificate
PWD Registration - Maharashtra
PRED Registration - Karnataka
PWD Registration - Karnataka
VAT Registration Certificate - Karnataka
CST Registration Certificate - Karnataka
Trademark Registry Certificate
MVAT - Maharashtra
CST

DG SETS - MACHINERY, EQUIPMENT & PROJECTS


LIST OF GENSETS AVAILABLE: - Ranging From 30 KVA to 1250 KVA
GENSETS - CLIENTS & PROJECTS

INFRASTRUCTURE - MACHINERY, EQUIPMENT & PROJECTS


LIST OF INFRASTRUCTURE EQUIPMENT, MACHINERY & RESOURCES
INFRASTRUCTURE - CLIENTS & PROJECTS

INFRASTRUCTURE – CIVIL PROJECTS

i) Mangalore Refinery and Petrochemical Limited


ii) Madhucon Projects Limited
iii) Pratik Enterprises
iv) K. Raheja Corp Pvt Ltd.
v) Antilia Commercial Pvt Ltd
vi) Nagarjuna Construction Company Ltd
vii) Powai Developers-1
viii) Shapoorji Pallonji & Co Ltd.
ix) Reliance Engineering Associates (P) Limited
x) Unity Infra Projects Limited
xi) UP State Bridge Corporation Ltd
xii) YATES – DESBUILD JOINT VENTURE
xiii) Atlanta Limited
xiv) Powai Developers -2
NITYANAND INFRASTRUCTURE LIMITED

INDEX

ONGOING PROJECTS – CIVIL PROJECTS

i) MANGALORE REFINERY AND PETROCHEMICALS LTD


ii) TECHNIMONT ICB
iii) MANGALORE SEZ LIMITED
iv) TOYO ENGINEERING INDIA LIMITED

FINANCIALS
2007- 2008

AUDIT REPORT - 2007- 08 – PAGE 1


AUDIT REPORT - 2007- 08 – PAGE 2
BALANCE SHEET - 2007-08
PROFIT & LOSS – 2007-08
IT – RETURN VERIFICATION FORM – 2007-08

2008 - 2009

AUDIT REPORT - 2008- 09 – PAGE 1


AUDIT REPORT - 2008- 09 – PAGE 2
AUDIT REPORT - 2008- 09 – PAGE 3
BALANCE SHEET - 2008-09
PROFIT & LOSS – 2008-09
IT – RETURN VERIFICATION FORM – 2008-09

2009 – 2010

AUDIT REPORT - 2009- 10 – PAGE 1


AUDIT REPORT - 2009- 10 – PAGE 2
AUDIT REPORT - 2009- 10 – PAGE 3
BALANCE SHEET - 2009-10
PROFIT & LOSS – 2009-10
IT – RETURN VERIFICATION FORM – 2009-10
About Us

NITYANAND INFRASTRUCTURE LIMITED

ABOUT US

Since 1976, we have been at the forefront of major infrastructure development in the areas of Road
Work Contracts, Excavations and Equipment supplies for large-scale projects around the country.

Nityanand Infrastructure Ltd. understands that the success and development of Infrastructure of a
country is one of its most essential Underpinning And innovation in infrastructure is a means for
building assets that support the economy. Investments in equipment and personnel training have
ensured a track record that has associated us with many renowned projects. We also have a
Construction Equipment Bank that provides machinery and support, on rental basis for large-scale
projects across the country.

Our company stems from a vision that the boundaries between products and services fade rapidly
too. As a market leader today, we must be able to integrate in a balanced way different types of
know-how that would transform stand-alone processes, products and services into a seamless,
value-rich solution. These challenges have been overcome by our experience, which today stands as
our core strength:

CONTRACTS: Taking this ideology we have developed a competence that today extends to handle
consultation, design, installation Fabrication. Excavation, Building Roads, dams, canals and other
related Civil Works.

Equipment Bank: which is the backbone to the construction contract business provides Rental
Solution for all type Machinery to projects regardless of the application, size, duration, industry and
location.

Our ancillary businesses have developed from an expertise to meet every need in the Infrastructure
scenario. Where innovative thought has led to a cross-functional diversification in providing the
following services:
Resource Consultancy Services: Our manpower services, establishes communication and mobilizes
personnel in project implementation as per client requirements. This support encompasses
operational & maintenance support for construction machines, mainly D.G sets for supporting
construction Power.

Nityanand Automobiles: State of the Art workshop for Repair equipments through the use of
modern technology, we have set up a workshop at Navi Mumbai and Panvel, dedicated to the
maintenance Repair Refurbish and supply of spares through an authorized dealership agreement
with MICO Bosch for next generation Fuel pumps.

Nityanand Multitrade Pvt Ltd: This Company is engaged in Banking and Non Banking Finance
facility for Construction Equipments and other Management guidance, and ensured that the
documentation and procedures are adequately in place for all policies and activities.
General Details

NITYANAND INFRASTRUCTURE LIMITED

INCORPORATION CERTIFICATE NO. & DATE 11- 84676 DT. 16.01.1995

ISO 9001 : 2000 REG. NO. MAH/ Q - 1079 dt. 08.09.2008


valid till 07.09.2011

PERMANENT ACCOUNT NO. AAACN1981E DATED 16/01/1995

TAN NO. MUMN05238C

SERVICE TAX NO. AAACN1981EST001


Dated 16/09/2008

Provident Fund No. MH/PF/Circle V/42827/361


Dated 23-10-2007

PROFESSION TAX NO. PT/R/ VI / 25/ 8055


Dated 05/05/05

BOMBAY SHOP ESTABLISHMENT REG. NO. 760014732/ Commercial II/ PS


Dated 19.07.2007

MAHARASHTRA PWD REG. NO. 2/ 2008-09 Class-1 (A)


Dated 05/04/2008.

KARNATAKA PWD REG. NO. . CBS 8403 CEVIL 2005


DT. 31.01.2009

VAT TIN – MAHARASHTRA 27230544719 V


W.E.F. 19.06.2006

CST TIN – MAHARASHTRA 27230544719 C


W.E.F. 19.06.2006

CST TIN – MAHARASHTRA 27230544719 C


W.E.F. 19.06.2006
General Details

NITYANAND INFRASTRUCTURE LIMITED

VAT TIN - KARNATAKA 29880820245


W.E.F. 22.10.2008

CST TIN - KARNATAKA 29880820245


W.E.F. 22.10.2008

CERTIFICATE OF REGISTRATION OF TRADE Trade Mark No:1366172 -


MARKS Dated 22-06-2005
NITYANAND INFRASTRUCTURE LIMITED
NITYANAND
ND
NA
T YA
NI
ND
NA
T YA
NI
ND
NA
T YA
NI
NITYANAND INFRASTRUCTURE LIMITED
NITYANAND

Resources & Projects

DG Sets - Machinery, Equipment & Projects


LIST OF GENSETS AVAILABLE: - Ranging From 30 KVA to 1250 KVA
GENSETS - CLIENTS & PROJECTS

Infrastructure - Machinery, Equipment & Projects


LIST OF INFRASTRUCTURE EQUIPMENT, MACHINERY & RESOURCES
INFRASTRUCTURE - CLIENTS & PROJECTS
NITYANAND INFRASTRUCTURE LIMITED
NITYANAND

LIST OF GENSETS AVAILABLE: - Ranging From 30 KVA to 1250 KVA

SL No Description Units

1 30 Kva 5
30KVA 25KW (Kirloskar/Oil Engine) RB33/RA33, 48BHP Radiator/Air cooled coupled to kirloskar/Stan ford
Alternator, 415Volts, 3Pharse (4Wire), 0.8PF (LAG) 1500RPM, Mounted on common base frame. INOS
starting battery fuel tank standard control panel 415 Volts,3 Phase(4 Wire),0.8 PF (LAG) 1500 Rpm,
starting Batteries, Fuel Tank, Standard Control Panel along with standard accessories like battery leads,
connection from Alternator up to panel board etc

2 62.5 kva: 38
62.5 KVA,50KW82AmpsLeyland Engine model (370/400/402) Cummins Engine model 38G7,+80BHP,water
cooled coupled to kirlosker/stamford ALTERNATOR 415 Volts,3 Phase(4 Wire),0.8 PF (LAG) 1500 Rpm,
starting Batteries, Fuel Tank, Standard Control Panel along with standard accessories like battery leads,
connection from Alternator up to panel board etc

3 125 kva: 28
125KVA/100KW Kirloskar Cummins NTC 495 G, 154 BHP, 6 Cylinders, Radiator Cooled Engine (174
Amps) coupled to KEC / Stamford Alternator 415 Volts, 3 Phase (4 wire), 0.8 PF (LAG) 1500 Rpm, 50 HZ
AC mounted on common Base Frame Complete with 2 No s Starting Batteries, Fuel Tank, Standard Control
Panel along with Standard Accessories like Battery leads, Connection from Alternator up to Panel Board
etc.

4 180 kva: 22
180KVA/150KW NT –743 G (NA) or 6CTA (250(Amps) 415Volts, 3 Phase (4 Wire), 0.8 PF (LAG) 1500 Rpm,
50HZ AC Stamford Alternators, coupled to kirloskar Cummins NT 743 G, 23 BHP, 6 Cylinders, Radiator cooled
Engine, Mounted on common Base Frame complete with 2 Nos Starting Batteries, Fuel Tank, Standard Control
Panel along with standard Accessories like battery lead, Connection cables etc.

5 250 KV 50
A250 KVA/200KW NT 855 G (NA) or 6CTB (348 Amps) 415 Volts, 3 Phase (4 Wire), 0.8 PF (LAG) 1500 Rpm,
50HZ AC Stamford Alternators, coupled to kirloskar Cummins engines NTA 855 G 2,306 BHP, 6 Cylinders,
Radiator cooled Engine, Mounted on common Base Frame complete with 2 No s Starting Batteries, Fuel Tank,
Standard Control Panel along with standard Accessories like battery lead, Connection cables etc

6 500 kva: 25
500 KVA / 400 KW VTA 28G NA or KT19 G (AC) D.G.Set compromising of Cummins VTA 28G Engine
developing 614 BHP coupled to Stamford make Alternator 415 Volts 3 Phase (4 Wire) 0.8 PF (LAG) 1500 Rpm
50 HZ Ac. Both mounted on a common base frame through a pair of flexible coupling complete with standard
Control panel, 990Ltr.Fuel Tank, 12 cylinders, 2 Nos. Starting Batteries of 12 Volts each, Connection from
alternator to panel board and all other standard Accessories.

7 625 kva: 2
625 KVA / 500 KW, Diesel Gen Set, Water cooled Engine make kirloskar Cummins, Model KTA 2300 – G 750
BHP Amps 869 coupled to suitable Alternator of Stamford make 415 Volts 3 Phase (4 Wire) 0.8 PF (LAG) 1500
Rpm 50 Hz AC with suitable Base Frame along with AVM Pads, Diesel Tank, Battery, Standard Panel Board,
Connection up to the panel Board from Alternator with ace Maintenance Kits like Filters etc.

8 750 kva: 5
750 KVA / 600KW, Diesel Gen Set, Water cooled Engine make Kirloskar Cummins, Model KTA 2300-G, 890
BHP, Amps 1042, Coupled to suitable Alternator of Stamford make 415 Volts 3 Phase (4 Wire) 0.8 PF (LAG)
1500 Rpm 50HZ AC with suitable base Frame along with AVM Pads, Diesel Tank, Battery, Standard Panel board,
Connection up to the panel Board from Alternator with ace Maintenance Kits like Filters etc.

9 1000 kva: 5
1000 KVA/800 KW ,Cummins Engine Model KTA –3067,1180- BHP, Radiator cooled Engine, 415 Volts, 3 Phase
(4 wire) 0.8 P.F (Lag) 1500 Rpm, 60 HZ, Stamford Alternator Mounted on sturdy Base Frame, 16 Cylinders, with

10 1250 kva: 5
1250 KVA/ 1000 KW, water-cooled Cummins Engines model 38.50 G3, 1475 Amps/ 1470 Bhp
NITYANAND INFRASTRUCTURE LIMITED
NITYANAND

GENSETS - CLIENTS & PROJECTS

Sr. No. Name of the Client Nature/ Description of Work Duration No of D.G Sets hired

1 Reliance Engineering Associates Pvt Ltd Deployment of D.G Set capacity from 62.5 2006-2009 100 nos
KVA to 1000 KVA at Reliance Jamnagar
Site, Gujarat

2 Punjlloyd Ltd Hiring Of 500 KVA & 250 KVA & 125 KVA 2008- Till Date 10 Nos
at Heera Redevelopment Project - Offshore
Site.

3 Om Sai Infrastructure Ltd Hiring of 625 KVA & 750 KVA- for crusher 2008- Till Date 5 Nos
plant at Bhawadi - Wagoli, Pune

4 Uttam Galva Steels Ltd Hiring of 62.5 KVA to 1000 KVA Capacity 2008- Till Date 20 Nos
D.G at Wardha Steel Project, Nagpur and
Khopoli Steel Project

5 Zydus Nycomed Care Pvt Ltd Hiring of 125KVA & 250 KVA for 2008- Till Date 5 Nos
emergency backup in Plant at MIDC,
Pawane, Navi Mumbai

6 Larsen & Toubro Ltd Hiring of 62.5 KVA to 500 KVA Capacity 2009- Till Date 20 Nos
D.G Set at L&T MONORAIL PROJECT at
Wadala and SEZ Arshiya Project at Panvel

7 Runwal Developers Pvt Ltd Hiring of 500 KVA & 250 KVA Capacity 2009- Till Date 5 Nos
D.G Set in RMALL Project at Mulund &
Thane

8 Tulip Telecom Ltd Hiring of 250 KVA D.G Set for Emergency 2007- Till Date 2 Nos
backup power at Mahape Plant, Navi
Mumbai

9 Nagarguna Construction Ltd Deployment of 125 KVA D.G Set at 2008- Till Date 3 Nos
Construction Site at Chakan,Pune &
Mazagon Dock, Mumbai

10 Seto Technolog Pvt Ltd Hiring of 62.5 KVA at Mahape site ,Navi 2007- Till Date 2 Nos
Mumbai

...and Many more !

Are you setting up a new enterprise and the sanction of grid power for construction activities takes time? We
have the solution of rental power generators, as temporary stopgap arrangement to speed up construction
activities and the timely completion of your projects. Many businesses are re-evaluating their plans and
procedures for business continuity in the event of major power shortfalls. Our emergency power solutions
come into rescue, to fulfil your production load by adding more power to the existing sanctioned capacity.

Save on Capital Costs with a negotiated long-term rental to back up a manufacturing operation in the event of:

a) Seasonal Requirement of additional power


b) A large order to be executed and the need for additional power. Would you like to outsource your
Power now! Call on us 24x7 for support and ready stock delivery.
NITYANAND INFRASTRUCTURE LIMITED
NITYANAND

LIST OF INFRASTRUCTURE EQUIPMENT, MACHINERY & RESOURCES


Sr no 1 Details of Plant & Machinery Model/Capacity Make/Nos

1 Dumpers & Tippers

35 nos 25 Ton ASHOK LEYLAND

5 nos 15.5 Ton TATA

2 Water Tanker

2 No LEYLAND

3 JCB- 3D

4 No 3DX Escorts

2 No 3D Escorts

4 EX - 60

2 Nos TATA

5 EX-100

1 No TATA

6 EX- 300

1 No TATA

7 EX- 200LC

1 No TATA

8 EX- 210 IES

8 Nos TATA

9 Roller

1 No Vibro soil compactor 1107D L&T

1 No Tandom IDD 90 Ingersoll Rand

10 PC- 300

1 No Komatsu
NITYANAND INFRASTRUCTURE LIMITED
NITYANAND

LIST OF INFRASTRUCTURE EQUIPMENT, MACHINERY & RESOURCES

11 PC - 200-6

1 No Komatsu

12 Hyraulic Excavator 320

2 No Caterpillar

13 Dozer - D4

2 No Komatsu

14 Dozer - D3

1 No Komatsu

15 Dozer - D6

2 Nos Komatsu

16 Hydra 14 Ton

4 No 14SB-3P Escort

17 Hydra 16 Ton

2 Nos HP 216 Escort

18 Motor Grader

1 No GD 511A Komatsu

1 No GD-405 Komatsu

19 BOBCAT

2 No S 130 Ingersoll Rand

20 Hydraulic Piling Rig HR -

1 No HR 180 Mait

21 Hydraulic Piling Rig HR -

1 No HR 130 Mait
NITYANAND INFRASTRUCTURE LIMITED
NITYANAND

LIST OF INFRASTRUCTURE EQUIPMENT, MACHINERY & RESOURCES


Other Equipment & Vehicles

1 Other Utility Vehicles

Mahindra Bolero - Camper

8 Nos Mahindra

2 Other Equipments

Form Work ,Shuttering & Enabling Material For 1 Set


2000 Sq Mtr Area

3 Shuttering & Scaffolding Materials 500 Nos

Cuplock Vertical 4 Cups-3.0 Mtrs 400 nos


Cuplock Vertical 4 Cups-2.5 Mtrs 1500 nos
Cuplock Vertical 4 Cups-1.5 Mtrs 1800 nos
Cuplock Vertical 4 Cups-1.2 Mtrs 500 nos
Cuplock Horizontal 4 Cups-1.0 Mtrs 2000 nos
U-head Jacks 450 mm 700 nos
Flat head Jacks 500 mm 300 nos
Shuttering plat 1200 nos
Channel Soldier 400 nos
Single Clip

4 20m3 Batching Plant Univeral-20M3/Hr

1 No

5 Transit Mixer Stetter Transit Mixer


Model AM 6 SHN

2 Nos

6 Concrete Mixer
2 Nos
1 Workshop Facilities Univeral-20M3/Hr

2600 Sqf Workshop equipped with Overhead Crane facilities

Lab Facilities 1

a) Sand replacement Appartus 2 Set


b) Core Cutter app 2 Set
c) Electronic Weighing Balance 1 Set
d) Slump Cone 1 Set
e) Leveling Instrument 1 Set
f) Cube Mould 12 Nos
g) Manually Operated Compression Testing machine 1 No
h) Standard Test Sieve - Sethi 1 Set
i) Total Station - Topcon 1 Set
j) Rapid Moisture Metre 1 Set
NITYANAND INFRASTRUCTURE LIMITED
NITYANAND

INFRASTRUCTURE - CLIENTS & PROJECTS


Sr. No. Name of work Name of Organisation Date of Start / Date of AMOUN T OF WORK In
Completion Lacs 2009-2010

1 Construction of New Road For Mangalore Mangalore SEZ Ltd. 2009 to 2010 1200.00
SEZ Limited WORK IN PROGRESS

2 Construction of RCC Structure for Control Mangalore Refineries & 2009 to 2010 259.00
Room; Civil & Structural Work for Sulphur Petrochemicals Ltd WORK COMPLETED
Pastilation unit at MRPL. Ven Code: SN425

3 Construction for Foundation of Cooling Tower Mangalore Refineries & 2009 to 2010 55.49
at MRPL Site Petrochemicals Ltd WORK IN PROGRESS

4 Construction Works of Temporary Site TECHNIMONT ICB Pvt 2009 to 2010 148.00
Facilities For MRPL CHTU Project at LTD, MUMBAI WORK IN PROGRESS
Mangalore

5 Piling Work at Guideway in 2B Series, Larsen & Toubro Limited, 2009 to 2010 111.67
Monorail Project for 1000mm dia Mumbai WORK IN PROGRESS

6 Excavation Work at Ambika Mills Compound. Kamala Group Of 2009 to 2010 417.00
Companies, Mumbai WORK IN PROGRESS

7 Excavation Works From Versova to Simplex Infrastructure Ltd, 2009 to 2010 29.6
Ghatkoper Stretch in Mumbai Metro Rail Mumbai WORK COMPLETED
Project.

8 Work Order for carrying out Earthwork for K. Raheja Corp P.L. 2008 to 2009 87.05
Foundation of proposed residential building Mumbai WORK COMPLETED
& Allied structures at Metal Box Worli,
Mumbai.

Work Order for carrying out earthwork for 2006 to 2007 124.18
foundations of proposed residential building WORK COMPLETED
No. B3 and its ancillary structures at
Hindustan Mills, Mahalaxmi, Mumbai.

9 Piling work and Road work & allied work of Yates Desbuild JV 2008 to 2009 382.06
New American Consulate Complex,US WORK COMPLETED
Embassy @ BKC.

Filling of soil borrowed from the quarry / 2006 to 2007 212.72


borrow area designated by the sub WORK COMPLETED
contractor and apporoved by YDJV from Pali
Hill. Includs Spreading & grading by by 8/10
metric ton vibro pneumatic tired roller to
achieve inclusive of royalty charges.

10 The Civil work for MLV -28, Kadav Site, Reliance Industries.Ltd 2008 to 2009 64.57
Karjat EWPL Project, MH State WORK COMPLETED

The Civil & Structural work of welder Traning 2007 to 2008 140.66
center (WTC) Central Maintenance WORK COMPLETED
workshop (CMW) & Store P & M Building at
Project, MH State Ghosalwadi, Mumbai
EWPL.

The Scope of work under this Contract is 2006 to 2007 26.70


backfilling works on all sides of Bldg. WORK COMPLETED
excavation and back filling.
NITYANAND INFRASTRUCTURE LIMITED
NITYANAND

INFRASTRUCTURE - CLIENTS & PROJECTS


11 Earth work and ground improvement works such Madhucon Projects Ltd 2007 to 2010 2106.00
as excavation in road way by mechanical means WORK COMPLETED
rocky soils by blasting / controlled blasting,
removal and disposal of unsuitable soils earth
work.

12 Earthwork excavation in basement in all Types of Annakoot Properties Pvt. 2008 to 2009 33.44
soil, such as Murrum Soft/Hard Rock by Manual/ Ltd WORK COMPLETED
Mechanical/ Pnemautic wedging chiseling
including carting away excavated material to
approved dumping ground Excavtion Work at Plot
No.21 MIDC Andheri (E) Mumbai.

13 Work order for carrying out excavation and Powai developers 2006 to 2007 133.4
disposal of soil and Rabit from Nursery plot, WORK COMPLETED
Raheja Vihar, Powai Mumbai

14 Work Order for carrying out earthwork for Hill Crest Developers 2006 to 2007 116.56
foundations of proposed residential building and WORK COMPLETED
its alliedstructures at bldg. No. 15, wing "E"
Raheja Vihar, Near Chandivali Village: Tunga,
Powai, Mumbai

15 Work order for execution of earthwork as per the Unity Infra Projects Ltd 2006 to 2007 24.32
details given in our tender specifications for on WORK COMPLETED
labour basis for proposed construction of Swan
Mills (||Primal) Ashok Gardens Residential Bldg
Site.

16 Work order for Transportation and back filling of Shapoorji Pallonji & Co. Ltd 2006 to 2007 96.9
Soil / Murum at New Consulate Complex, US WORK COMPLETED
Embassy, Site BKC Mumbai

17 The Scope of work under this Contract for work of M/s. Pratik Enterprises 2006 to 2007 144.98
training of Mithi river.(widening & Deepening from WORK COMPLETED
C ST Road to Powai (Gr. No. 5)

18 Work Order for Excavation and Earth Works at our Nagarjuna Construction Co. 2004 to 2005 97.58
CSPL Vasai Site Ltd WORK COMPLETED

19 Widening and Construction of Western Express Atlanta Ltd 2004 to 2005 650.26
Highway from Times of India Flyover north end to WORK COMPLETED
Asha Nagar, Subway & Kulupwadi Pedestrian
Subway (Km. 510.35 to 504.00)

20 Widening & strengthening of Kalanagar - Vakola U.P. State Bridge 2004 to 2005 112.7
Road, Project Mumbai Dismantlng Work. Corporation Ltd. WORK COMPLETED

21 LOI for Rock Excavation & Removal of Over Antilia Commercial P.L 2004 to 2005 35.71
Burden Earthwork in th plot at Atlamont road, WORK COMPLETED
Mumbai
NITYANAND INFRASTRUCTURE LIMITED
NITYANAND

projects

Infrastructure Civil Projects


NITYANAND INFRASTRUCTURE LIMITED
NITYANAND

projects

Ongoing Projects
Contact Us

NITYANAND INFRASTRUCTURE LIMITED

Corporate Office (Correspondence):


NITYANAND INFRASTRUCTURE LTD. Sales
711, Highway Commerce Centre, sales@nityanand.com
Off Western Express Highway,
I.B. Patel Road, Purchase
Goregaon (East), Mumbai - 400063, purchase@nityanand.com
Maharashtra, India.
Telephone : (+91) (22) 4088 4444 General Information
Email: nityanand1@vsnl.com nityanand1@vsnl.com

Registered Office:
NITYANAND INFRASTRUCTURE LTD.
G.D. Ambekar Marg,
Opp. Abhyudaya Nagar Post Office,
Cottongreen (West), Mumbai - 400033,
Maharashtra, India.
Telefaxno : (+91) (22) 4088 4444
Fax : (+91) (22) 2686 6812
Email: nityanand1@vsnl.com

Works:
OM NITYANAND
Near Old Mumbai - Pune toll naka,
Near Raigad Petrol Pump, Thombre Wadi,
Post - Poinge, Dist - Raigad,
Panvel - 410206
Telephone - (02143) 239108 / 107<
Email: nityanand1@vsnl.com

NITYANAND INFRASTRUCTURE LTD.


Plot No - A/132, MIDC,
T.T.C. Industrial Area,
Pawane Village,
Navi Mumbai - 400705
Telephone - (022) 27685195, 27689146
Email: nityanand1@vsnl.com

Anda mungkin juga menyukai