Rp10,000,000
Rp20,325,000
Rp33,875,000
Rp27,100,000
Rp54,200,000
Rp24,600,000
Rp170,100,000
Rp0
Rp18,450,000
Rp20,000,000
Rp20,000,000
Rp79,575,000
Rp182,925,000
Rp0
Rp0
Rp0
Rp0
Rp7,500,000
Rp15,000,000
Rp9,840,000
Rp61,500,000
Rp0
Rp30,000,000
Rp159,900,000
Rp566,000,004
Rp1,170,690,004
Rp3,766,716,879
Rp94,167,922
Rp3,860,884,801
Rp284,936
Rp0
Rp18,805,786
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
Rp0
HPP BANGUNAN
PERUMAHAN GREEN ASRI RESIDENCE
PT. PAMUNGKAS PUTRA UTAMI
Harga
No URAIAN Volume Satuan JUMLAH
Satuan
A PERIJINAN
1 IMB Induk 8,118 m2 Rp2,500 Rp20,295,000
Total Biaya Perijinan Rp20,295,000
Rp0
B BIAYA KONSTRUKSI Rp0
1 Bangunan Type 36/72 123 Unit Rp54,000,000 Rp6,642,000,000
PENDAPATAN
Modal Awal 500,000,000
Pencairan KYG 70 % 324,000,000 453,600,000 324,000,000
Uang Muka Type 36/72 123 Unit - -
Uang Muka Type 45/84 - Unit - -
KPR Type 36/60 123 Unit 150,000,000 18,450,000,000 100,000,000 200,000,000 200,000,000 150,000,000 110,000,000
KPR Type 45/84 - Unit - -
Tanah Lebih 24 m2 750,000 18,000,000
Pencairan PSU Unit -
Total Pendapatan 18,468,000,000 500,000,000 100,000,000 653,600,000 200,000,000 150,000,000 434,000,000
B PENGELUARAN
I PEROLEHAN TANAH
1 Pembelian tanah 13,550 m2 142,500 1,930,875,000 100,000,000 100,000,000 300,000,000 200,000,000 100,000,000
2 Fee Mediator - % - -
3 Pembelian Tanah Makam - m2 - -
4 Pembelian tanah Jalan Masuk - m2 - - -
5 SPH 12% % 1,930,875,000 231,705,000
6 Land Clearing 13,550 m2 10,000 135,500,000 50,000,000
Total Biaya Perolehan Tanah 2,298,080,000 150,000,000 100,000,000 300,000,000 200,000,000 100,000,000 -
II PERIJINAN
1 Perencanaan Projek & Proposal 1 Ls 10,000,000 10,000,000 10,000,000
2 Ijin Prinsip 13,550 m2 1,500 20,325,000 20,325,000
3 Ijin Lokasi 13,550 m2 2,500 33,875,000 33,875,000
4 Pengesahan Site Plan 13,550 m2 2,000 27,100,000 27,100,000
5 Sertifikat Induk 13,550 m2 4,000 54,200,000 54,200,000
6 Sertifikat Pecahan 123 Unit 200,000 24,600,000 24,600,000
Total Biaya Perijinan 170,100,000 170,100,000 - - - - -
III SARANA DAN PRASARANA -
1 Stake Out 123 Unit 150,000 18,450,000 18,450,000
2 Jembatan Masuk 32 m2 1,000,000 32,000,000 32,000,000
3 Pintu Gerbang 2 Ls 20,000,000 40,000,000 20,000,000 20,000,000
4 Jalan Masuk 1061 m2 75,000 79,575,000 30,000,000 20,000,000 20,000,000 20,000,000 20,000,000
5 Jalan Utama - m2 75,000 - - -
6 Jalan Lingkungan - m2 200,000 - -
7 Saluran Jalan Masuk 0 m1 180,000 - -
8 Saluran Jalan Utama 0 m1 180,000 - -
9 Saluran Jalan Lingkungan - m1 100,000 - 20,000,000 20,000,000
10 Duiker dan Gorong-Gorong 3 Unit 1,500,000 4,500,000 1,500,000 3,000,000
11 Lampu Penerangan Jalan 10 Unit 1,500,000 15,000,000 15,000,000 4,500,000
12 Tanaman Penghijauan 123 Pohon 500,000 61,500,000 5,000,000 5,000,000 5,000,000 5,000,000
13 Gardu listrik 123 Ls 1,300,000 159,900,000 4,000,000 10,000,000 10,000,000
14 panel listrik 2 Unit 15,000,000 30,000,000 15,000,000
15 bak sampah 123 Unit 80,000 9,840,000 500,000 1,000,000
16 Masjid 283 m2 2,000,000 566,000,004
Total Biaya Sarana dan Prasarana 1,016,765,004 108,950,000 80,000,000 35,000,000 223,950,000 - 20,000,000
IV BIAYA KONSTRUKSI -
1 Bangunan Type 36/72 123 Unit 58,799,125 7,232,292,375 100,000,000 50,000,000 50,000,000 100,000,000 50,000,000 100,000,000
2 Bangunan Type 45/84 - Unit - -
Total Biaya Konstruksi 7,232,292,375 100,000,000 50,000,000 50,000,000 100,000,000 50,000,000 100,000,000
V SARANA & FASILITAS KAVLING -
1 Pengadaan Air 123 Unit 2,000,000 246,000,000 5,000,000 5,000,000 5,000,000
2 Pengadaan Listrik 123 Unit 1,300,000 159,900,000 2,500,000 2,500,000 5,000,000 5,000,000
3 IMB INDUK 8,118 M2 5,000 40,590,000 40,590,000 15,000,000
4 Sertifikat Pecahan 123 Unit 300,000 36,900,000 20,000,000 16,900,000 9,900,000
Total sarana dan Fasilitas Kavling 483,390,000 63,090,000 16,900,000 7,500,000 5,000,000 5,000,000 34,900,000
VI BIAYA OPERASIONAL
1 Biaya Gaji 15 bln 2,500,000 37,500,000 - 1,000,000 1,000,000 1,000,000 1,000,000
2 BELI Kendaraan Roda 4 - Unit 120,000,000 - -
3 Beli Kendaraan Roda 2 1 Unit 12,000,000 12,000,000 -
4 Biaya Operasional Kendaraan 15 bln 500,000 7,500,000 500,000 500,000 500,000 500,000 500,000 500,000
5 Atk 15 bln 2,000,000 30,000,000 500,000 500,000 500,000 500,000 500,000 500,000
Total Biaya Operasional 1,000,000 1,000,000 2,000,000 2,000,000 2,000,000 2,000,000
VII BIAYA MARKETING
1 Baligo 5 Unit 50,000 250,000 250,000
2 Spanduk 10 Bh 100,000 1,000,000 1,000,000
3 Brosur 10 Rim 120,000 1,200,000 1,200,000
4 Banner 5 bh 80,000 400,000 400,000
5 Fee Marketing T.36/72 123 Unit 1,000,000 123,000,000 1,000,000 1,000,000 1,000,000 1,000,000 1,000,000
6 Fee Marketing T.45/84 - Unit - -
Total Biaya Marketing 125,850,000 2,850,000 1,000,000 1,000,000 1,000,000 1,000,000 1,000,000
11,326,477,379 321,100,000 102,000,000 388,000,000 424,950,000 158,000,000 157,900,000
c LABA/RUGI ( +/-)
18,000,000
-
438,000,000 140,000,000 420,000,000 - - - - - -
- - - - - - - - -
- - - - - - - - -
30,000,000 30,000,000
- -
30,000,000 30,000,000
5,000,000 5,000,000
5,000,000 5,000,000
70,000,000 70,000,000 - - - - - - -
100,000,000 100,000,000
100,000,000 100,000,000 - - - - - - -
5,000,000 5,000,000
5,000,000 5,000,000 - - - - - - -
1,000,000
1,000,000 - - - - - - - -
178,000,000 177,000,000 5,000,000 2,500,000 2,500,000 2,500,000 2,500,000 2,500,000 2,500,000
Pembelian tanah
Tanah lokasi utama
Ijin lokasi
Ijin Prinsip
infra struktur kavling siap
Pembangunan
perumahan tahap 1(200 unit)
konsumen
Jalan dan saluran
15%
20% 10% 10%
20% 20% 10% 10%
20% 20% 20% 20%
BULAN BULAN BULAN BULAN BULAN BULAN BULAN
KE 18 KE 19 KE 20 KE 21 KE 22 KE 23 KE 24