PEMERINTAH KABUPATEN MERAUKE

DINAS PEKERJAAN UMUM


JL. ERMASU MERAUKE NO 01 99613 TELP/FAX : (0971) 325559

LAMP SRT/LAP NO : DIKERJAKAN : LAB. DINAS P U


PEKERJAAN : Perencanaan Jembatan Kali Kumb-Muting DIBUAT : RONALD N KELANIT
KONTRAKTOR : PT. Aria Graha TGL.PEMERIKSAAN : 14 - 07 - 2016
LOKASI : Distrik Muting. Kab Merauke LOKASI TITIK : Titik I

PENYELIDIKAN LAPANGAN DENGAN SONDIR


(1) (2) (3) (4) (5) (6) (7)
JUMLAH PERLAWANAN HAMBATAN J.H.P HAMBATAN
KEDALAMAN QC PERLAWANAN GESEK (3)-(2) PELEKAT (5) SETEMPAT
( CM ) ( KG/CM2) ( KG/CM2) ( KG/CM2) (5D/hg)X(4) (KG/CM) (D/4hg)x(4)
(KG/CM)
- 0 0 0 - - -
0.20 0 0 0 - - -
0.40 15 17 2 2.68 2.68 0.13
0.60 10 15 5 6.69 9.37 0.33
0.80 10 15 5 6.69 16.06 0.33
1.00 20 30 10 13.38 29.44 0.67
1.20 20 35 15 20.08 49.52 1.00
1.40 25 50 25 33.46 82.98 1.67
1.60 20 45 25 33.46 116.44 1.67
1.80 20 50 30 40.15 156.59 2.01
2.00 20 50 30 40.15 196.74 2.01
2.20 20 65 45 60.23 256.96 3.01
2.40 50 70 20 26.77 283.73 1.34
2.60 40 65 25 33.46 317.19 1.67
2.80 45 70 25 33.46 350.65 1.67
3.00 35 70 35 46.84 397.49 2.34
3.20 25 60 35 46.84 444.33 2.34
3.40 25 70 45 60.23 504.56 3.01
3.60 25 80 55 73.61 578.17 3.68
3.80 25 70 45 60.23 638.39 3.01
4.00 25 90 65 86.99 725.38 4.35
4.20 25 85 60 80.30 805.68 4.02
4.40 25 90 65 86.99 892.68 4.35
4.60 30 90 60 80.30 972.98 4.02
4.80 30 100 70 93.68 1,066.66 4.68
5.00 30 105 75 100.38 1,167.04 5.02
5.20 30 110 80 107.07 1,274.11 5.35
5.40 30 120 90 120.45 1,394.56 6.02
5.60 35 130 95 127.14 1,521.70 6.36
5.80 35 145 110 147.22 1,668.92 7.36
6.00 50 155 105 140.53 1,809.44 7.03
6.20 55 160 105 140.53 1,949.97 7.03
6.40 55 160 105 140.53 2,090.50 7.03
6.60 60 180 120 160.60 2,251.10 8.03
6.80 60 175 115 153.91 2,405.01 7.70
7.00 60 180 120 160.60 2,565.61 8.03
7.20 60 185 125 167.29 2,732.90 8.36
7.40 75 195 120 160.60 2,893.50 8.03
7.60 75 205 130 173.98 3,067.49 8.70
7.80 75 205 130 173.98 3,241.47 8.70

A DIAMETER CONUS (DC) = 3.56 cm CATATAN :


B DIAMETER SELIMUT GESER (DG) = 3.56 cm
C PANJANG SELIMUT GESER (HG) = 13.3 cm

MENGETAHUI DIPERIKSA
KABID PERALATAN DAN PENGUJIAN KASIE PENGUJIAN DAN BINA TEKNIS

ARIS T SANDIN ROHMAT


NIP.19630410 198907 1 003 NIP. 19650827 198703 1 013
PEMERINTAH KABUPATEN MERAUKE
DINAS PEKERJAAN UMUM
JL. ERMASU MERAUKE NO 01 99613 TELP/FAX : (0971) 325559

LAMP SRT/LAP NO : DIKERJAKAN : LAB. DINAS.P U


PEKERJAAN : Perencanaan Jembatan Kali Kumb-Muting DIBUAT : RONALD N KELANIT
KONTRAKTOR : PT. Aria Graha TGL.PEMERIKSAAN : 14 - 07 - 2016
LOKASI : Distrik Muting. Kab Merauke LOKASI TITIK : Titik I

GRAFIK SONDIR

qc (kg/cm2)
0 20 40 60 80 100 120
0.00

1.00

2.00

3.00

4.00
Depth (m)

JHP qc
5.00

6.00

7.00

8.00

9.00

10.00
0.0 1000.0 2000.0 3000.0 4000.0
JHP(kg/cm)

MENGETAHUI DIPERIKSA
KABID PERALATAN DAN PENGUJIAN KASIE PENGUJIAN DAN BINA TEKNIS

ARIS T SANDIN ROHMAT


NIP.19630410 198907 1 003 NIP. 19650827 198703 1 013