Pekerja 110000
Tukang 150000
Kepala Tukang 135000
Mandor 140000
Pengecatan dinding
Bahan
Cat dasar 0.12 kg Rp 50,000
Cat penutup 0.18 kg Rp 102,100
Jumlah
Tenaga
Pekerja 0.028 oh Rp 88,900
Tukang Cat 0.042 oh Rp 115,500
Kepala Tukang 0.0042 oh Rp 133,000
Mandor 0.003 oh Rp 141,400
Jumlah
Keliling 1 26.95
Bata/m2 8.3 bh/m2 1m3 83 bh
Kebutuhan Batu per 379.725 4.575
m2
Kebutuhan Batu per 249 3
m2
Kebutuhan Batu per 217.875 2.625
m2
241.696 2.912
183.264 2.208
Atap
Asbes 180x105 mm 1.89 m2 51000
Luas 48.925
Kebutuhan Asbes 25.88624
26 1,326,000
Keramik Lantai
Lantai 1
Lantai 2
Luas
zak 37000 1,295,000
m3 328571.4 2,300,000
80000 1,040,000
4,635,000
m P3 0 Pkm 2.8 m
3.75 m L3 3.75 Lkm 2.72 m
4m T3 3.5 Tkm 4m 3.5
30 V3 26.25
K1 29.12
K2 22.08
1 Pondasi
2 Baja Tulangan
3 Dinding Bata lt 1 83.6375 Rp 60,400.00 Rp 5,051,705.00
4 Dak Beton Rp 9,091,797.38
a Semen 45.0607 Zak Rp 62,000.00 Rp 2,793,763.25
b Koral 3.2445 m3 Rp 280,000.00 Rp 908,460.00
c Pasir 2.163 m3 Rp 200,000.00 Rp 432,600.00
d Besi 90.1268 btg Rp 55,000.00 Rp 4,956,974.14
Triplek 8mm 18.77592 Rp 81,000.00 Rp 1,520,849.64
Bambu 108.15
Kawat Bendrat
Paku
5 Dinding Bata lt 2 117.2 Rp 60,400.00 Rp 7,078,880.00
6 Pintu
Jendela
Plafond
Atap
Total Rp 21,222,382.38
Besi 6 mm 63 Besi 10 mm
Besi 8 mm
Besi 10
9/16/2020 Besi 8
Bata Ringan 1 m3 670,000 670,000 Besi 6
Pengerek 1 pcs 45,000 45,000 Bendrat
Tali Tampar 8 m3 2,500 20,000
Besi uk 6 mm 5 btg 25,000 125,000
860,000 Pasir
Kerikil
17-19/09/2020 Semen
Semen mortar/putih
Bata Ringan 3 m3 670,000 2,010,000 Bata Hebel
Semen Perekat 2 zak 65000 130,000
Kawat Bendrat 1 kg 18000 18,000 Papan
Glass Block 24 bh 23000 552,000
2,710,000
8/24/2020
3,570,000 Bata Hebel
Total Sementara Bendrat
Bahan 28,818,000 Pasir
Upah 10,475,000 Semen
39,293,000
8/25/2020
9/21/2020 Semen
Bata Ringan 1 m3 700,000 700,000 Bata Hebel
Semen Mortar 1 zak 80,000 80,000 Mortar
780,000
8/26/2020
9/22/2020 Batu Hebel
Bata Ringan 2 m3 670,000 1,340,000 Pasir
Semen Perekat 2 zak 100,000 200,000
Besi 6x12 5 btg 25000 125,000 8/27/2020
Kawat Bendrat 1 kg 18000 18,000 Besi 6
1,683,000 Besi 8
Besi 8
9/24/2020
Bata Ringan 1 m3 670000 670,000 8/28/2020
Ember
9/26/2020 Pasir
Bata Ringan 1 m3 670000 670,000 Kerikil
Besi 6x12 5 btg 26000 130,000
Besi 8x12 20 btg 40000 800,000 8/29/2020
Kawat Bendrat 2 kg 18000 36,000 Pasir
1,636,000 Kerikil
Semen Gresik
Total 4,769,000
Total Sementara 33,587,000 Papan
Upah 13,060,000 Triplek
Jumlah Total 46,647,000 Kaca Box
10/1/2020
Bata Ringan 3 m3 670000 2,010,000
10/3/2020
Hak Pancing 10 100 bj 1500 150,000 8/31/2020
Balok Kayu 6x12
10/5/2020 Kayu 4x6
CNP 100 x 50 x 2 14 Bj 144000 2,016,000
Ongkir 1 Ls 30000 30,000
2,046,000
Besi 8x12
10/6/2020 Besi 6x12
Bata Ringan 1 m3 670000 670,000 Kawat Bendrat
10/8/2010
Paku Triplek 1.25 kg 20000 25,000 Paku 3 1/2
Asbes 3 mm 10 Bh 130000 1,300,000 Paku 2 1/2
Asbes 2 1/2 mm 5 Bh 115000 575,000
Kuas 1 Bh 10000 10,000
1,910,000 Bata Hebel
Asbes 2 1/2 mm 5 Bh 115000 575,000
2,485,000 9/2/2020
Papan
Pasir 3 Glk 50,000 150,000
Asbes 3 mm 2 Bh 130000 260,000 9/3/2020
Asbes 2 1/2 mm 2 Bh 115000 230,000 Besi 6x12
640,000 Besi 8x12
Hak Pancing 10 30 bj 2000 60,000 Besi 10x12
Kawat Bendrat
700,000 WD Potong besi
Bata Lubang 40 bh 10000 400,000
11/10/2020
Kamar Mandi 9/5/2020
Keramik Dinding 7 Dus 55000 385,000 Besi 8x12
Keramik Lantai 3 Dus 53000 159,000 Besi 10x12
Closet Duduk 1 Bh 450000 450,000
Mini Keramik 35 Bh 2000 70,000
Lubang Pipa 1 Bh 15000 15,000
1,079,000
+ongkir 10000 9/9/2020
Total 1,089,000
Semen 3 roda
10/12/2020 Pasir
Besi 8 mm 5 btg 40000 200,000 Kerikil
Kawat Bendrat 1 kg 20000 20,000 Pasir
220,000 Semen
10/13/2020 Papan
Pasir 2 Glg 50000 100,000 Besi 8
Semen 3 Zak 52000 156,000 Besi 6
Besi 8 mm 3 Btg 40000 120,000 Kawat Bendrat
Besi 6 mm 5 Btg 25000 125,000
501,000
10/14/2020
Pasir 3 Glg 50000 150,000 11/11/2020
Semen 2 Zak 52000 104,000 Keramik Milan Perh
254,000 Krmk Jupiter Beige
10/15/2020
Semen 2 Zak 52000 104,000
Applus 1 Zak 65000 65,000 29/10/2020
169,000 Kupi
10/16/2020 A+
Asbes 1 Bh 115000 115,000
Pasir 1 Glg 50000 50,000 11/11/2020
Semen 2 Zak 52000 104,000 Semen
269,000 Pasir
Keramik 1 Dus 55000 55,000
324,000
11/13/2020
Alat" Listrik 395,000 Semen
Pasir
10/17/2020 Batu Bata
Semen 3 Roda 3 Zak 47000 141,000
Alkasit 2 Bh 15000 30,000
175,000 11/14/2020
Kabel NCM 2x1.5 1 Roll 255000 255,000 Krmk Jupiter Brwn
Fitting Lampu 8 Pcs 5000 40,000 Keramik Milan Perh
Stop Kontak 4 Pcs 9000 36,000
Sakral Seri 2 Pcs 10000 20,000 Mitra Beige
Sakral Engkel 3 Pcs 7000 21,000
Kabel 3 lubang 2 Pcs 18000 36,000 Pasir
Isolasi 1 Pcs 5000 5,000 Semen
Klem Kabel 2 Pack 5000 10,000
423,000
Engsel Pintu
3,819,000 Engsel Jendela
Bahan 47,777,000 Lamiler
Upah 16,180,000 Cylinder
63,957,000 Muller Lock
Digen
PVC 2" 2 Bh 48000 96,000 GBC
PVC 3/4 2 Bh 26000 52,000
Keni 3/4 2 Bh 1500 3,000
Keni 2" 1 Bh 2500 2,500
153,500
10/20/2020
Bata Mulia 150 Bh 700 105,000
Semen 3 roda 2 Zak 47000 94,000
Pasir 2 Glg 50000 100,000
299,000
Semen 3 roda 5 47000 235,000
Pasir 1 50000 50,000
1 65000 65,000
Closet 1 140000 140,000
Keni 1 8000 8,000
498,000
10/22/2020
Pasir 2 Glg 50000 100,000
Semen 3 roda 3 Zak 47000 141,000
Semen putih 1 Zak 100000 100,000
Lem Rajawali 2 Bj 14000 28,000
369,000
10/23/2020
Semen 3 roda 5 Zak 52000 260,000
1,579,500
Keramik Milan Perh 75 Dos 65000 4,875,000
Dallas Grey 7 Dos 58000 406,000
5,281,000
11,781,000
13,360,500
Bahan 61,137,500
Upah 18,915,000
Total 80,052,500
10/26/2020
Kalsium 1 Zak 40,000 40,000
Semen 3 Zak 52,000 156,000
Pasir 1 Glk 50,000 50,000
Pintu PVC Ijo 1 Bh 175,000 175,000
421,000
10/30/2020
Pasir 3 Glk 50000 150,000
Semen 5 Zak 52000 260,000
410,000
11/2/2020
Pasir 5 Zak 50000 250,000
Semen 5 Glk 52000 260,000
Paralon 3/4 5 Bh 32000 160,000
Keni 10 Bh 2500 25,000
695,000
Pipa 3/4 1 Bh 30000 30,000
Keni 2 Bh 1000 2,000
T Pipa 1 Bh 2000 2,000
34,000
11/3/2020
Semen 4 Zak 47500 190,000
Pasir 4 Glk 50000 200,000
390,000
11/4/2020
Pasir 3 Glk 50000 150,000
Semen 2 Zak 52000 104,000
Semen A 2 Zak 47500 95,000
349,000
11/7/2020
Pasir 1 Glk 50000 50,000
Semen 2 Zak 52500 105,000
155,000
11/1/2020
Keramik Mitra 2 Dus 49000 98,000
Keramik Atom 1 Dus 55000 55,000
KM Abu 100 Bj 1000 100,000
253,000
10/31/2020
Krmk Jupiter Brwn 5 Dus 65000 325,000
Krmk Hrzon Green 4 Dus 65000 260,000
Krmk Jupiter Beige 5 Dus 58000 290,000
875,000
3,738,000
Total 5,470,000
10/10/2020
Upah 3,120,000
10 Bh 130000 1,300,000
7 Ikat 200000 1,400,000 10/17/2020
2,700,000 Upah 2,860,000
+Ongkos 2,750,000
10/24/2020
20 Btg 39000 780,000 Upah 2,735,000
5 Btg 25000 125,000
2 Kg 18000 36,000 10/31/2020
941,000 Upah 2,860,000
11/8/2020
1 Kg 14000 14,000 Upah 2,750,000
1 Kg 14000 14,000
28,000
8 Bh 100000 800,000
1 8500 8,500
1 63000 63,000
71,500
3 Bh 22500 67,500
2 Bh 17500 35,000
2 Bh 10000 20,000
1 Bh 35000 35,000
1 Bh 175000 175,000
4 Bh 15000 60,000
1 Bh 125000 125,000
517,500
1,140,000
Hari Harga Total
6 150000 1,800,000
6 110000 1,320,000
Jumlah 3,120,000
Tukang (-1) 2,810,000
Total 2,650,000
hr 400000 400000
OH 150000 300000
OH 125000 875000
1575000
OH 3 150000 900,000
OH 3 110000 660,000
260000 1,560,000
800000
770000
1,570,000
10,475,000
13,060,000