GAMBAR RENCANA KERJA

PEKERJAAN :
DED DRAINASE KECAMATAN DOLO

LOKASI :

DESA KOTAPULU DAN DESA KOTARINDAU

PERENCANA :
LONG SECTION JALAN TRANS DESA SIBEDI
STA AKHIR (0+625,97)
PEMERINTAH DAERAH
KABUPATEN SIGI
DINAS PEKERJAAN UMUM DAN PERUMAHAN
ARAH KE KULAWI

ARAH KE KOTA PALU P16 KEGIATAN :


JALAN TRANS DESA SIBEDI
JALAN TRANS DESA SIBEDI
P15
P1 P2 P3 P4 P9 P14
P0 P5 P8 P10 P11 P12 P13
P6 P7 PEKERJAAN :
STA AWAL (0+000) PENYUSUNAN MASTER PLAN DAN
BATAS DESA SIBEDI/PADENDE DED DRAINASE KEC. MARAWOLA

ALUR ALAM LOKASI :

DESA SIBEDI

JALAN BUU KETERANGAN :


TANDA

44.00 Plat Duiker Eksisting


Rencana
43.00 Box Culvert 1.5x1.5
MENYETUJUI :
Elev. Dasar Existing
PEJABAT PELAKSANA TEKNIS KEGIATAN
42.00 ( PPTK )

41.00 Elev. Tanah Asli


Elev. Muka Saluran
Rencana
40.00 Elev. Dasar Saluran
Box Culvert 1.5x1.5
........................................
NIP. ......................

39.00 TIM TEKNIS TTD

38.00

37.00

36.00
KONSULTAN PERENCANA :

NOMOR PATOK (M) P0 P1 P2 P3 P4 P5 P6 P7 P8 P9 P10 P11 P12 P13 P14 P15 P16
2.09

5.8

JARAK PATOK (M) 47.91 50 50 49.99 22.17 22.03 50 50 50 50 49.99 49.96 49.89 26.15
222.16
JARAK LANGSUNG (M) 2.09 50 100 150 199.99 249.99 299.99 349.98 399.98 449.98 499.98 549.93 599.82 625.97
227.96 DIRENCANA : DIGAMBAR :
+43.357
+43.358

+42.093

+40.921 +41.121 +41.121

+39.982 +40.182 +40.182

+39.576 +39.776 +39.776


+39.082 +39.822 +39.822

+38.764 +39.504 +39.504

+37.764 +38.435 +38.435

+37.695 +38.372 +38.372

+37.632 +38.613 +38.613

+38.168

+38.343

+38.226

+38.441

+38.122
+42.76

EL. TANAH ASLI (M)

EL. MUKA SALURAN (M)


EKSISTING

NAMA GAMBAR SKALA GAMBAR


EL. DASAR SALURAN (M)

LONG SECTION RUAS KANAN V = 1:100


LA = 0.40 m LA = 0.40 m LA = 0.64 m LA = 0.64 m LA = 0.64 m JL.TRANS DESA SIBEDI H = 1 : 2000
DIMENSI SALURAN (M) LB = 0.20 m LB = 0.20 m LB = 0.50 m LB = 0.50 m LB = 0.50 m
H = 0.25 m H = 0.25 m H = 0.74 m H = 0.74 m H = 0.74 m
+42.757 +43.257
+42.758 +43.258

+41.493 +41.993

+40.521 +41.021

+39.582 +40.082

+39.176 +39.676

+38.004 +39.404

+36.122 +37.522

+37.222 +37.722

+37.272 +37.772

+37.322 +37.822

+37.372 +37.872

+37.422 +37.922

+37.472 +37.972

+37.522 +38.022
+42.66

+39.5

EL. MUKA SALURAN (M)


+37.022
+42.16
RENCANA

+38.1
+39

EL. DASAR SALURAN (M)


NO. LEMBAR : JML. LEMBAR :

LA = 0.60 m LA = 0.60 m LA = 0.60 m LA = 0.60 m LA = 1.60 m LA = 0.60 m LA = 0.60 m LA = 0.60 m LA = 0.60 m LA = 0.60 m LA = 0.60 m LA = 0.60 m
DIMENSI SALURAN (M) LB = 0.40 m LB = 0.40 m LB = 0.40 m LB = 0.40 m LB = 1.40 m LB = 0.40 m LB = 0.40 m LB = 0.40 m LB = 0.40 m LB = 0.40 m LB = 0.40 m LB = 0.40 m
H = 0.50 m H = 0.50 m H = 0.50 m H = 0.50 m H = 1.50 m H = 0.50 m H = 0.50 m H = 0.50 m H = 0.50 m H = 0.50 m H = 0.50 m H = 0.50 m

LONG SECTION RUAS KANAN JL. TRANS DESA SIBEDI


01 02
Skala H 1:2000
V 1:100
STA AKHIR (0+621,24)
PEMERINTAH DAERAH
P14
KABUPATEN SIGI
P13 DINAS PEKERJAAN UMUM DAN PERUMAHAN
P0 P1 P2 P3 P4 P5 P6 P7 P12 ARAH KE KULAWI
P8 P9 P10 P11

ARAH KE KOTA PALU KEGIATAN :


JALAN TRANS DESA SIBEDI
JALAN TRANS DESA SIBEDI

PEKERJAAN :
STA AWAL (0+000) PENYUSUNAN MASTER PLAN DAN
BATAS DESA SIBEDI/PADENDE DED DRAINASE KEC. MARAWOLA

ALUR ALAM LOKASI :

DESA SIBEDI

JALAN BUU KETERANGAN :


TANDA

44.00
Plat Duiker Eksisting

43.00
MENYETUJUI :

42.00 PEJABAT PELAKSANA TEKNIS KEGIATAN


( PPTK )

41.00 Elev. Tanah Asli


Elev. Muka Saluran
Rencana
40.00 Box Culvert 1.5x1.5 Elev. Dasar Saluran

........................................
NIP. ......................
39.00
TIM TEKNIS TTD

38.00

37.00

36.00

KONSULTAN PERENCANA :
NOMOR PATOK (M) P0 P1 P2 P3 P4 P5 P6 P7 P8 P9 P10 P11 P12 P13 P14

JARAK PATOK (M) 2.09 47.91 50 50 49.99 50 50 50 50 50 49.99 49.96 49.84 21.46

JARAK LANGSUNG (M) 2.09 50 100 150 199.99 249.99 299.99 349.98 399.98 449.98 499.98 549.93 599.78 621.24
DIRENCANA : DIGAMBAR :
+43.294
+43.251

+42.605

+41.391

+40.771

+39.946

+39.332

+38.114

+38.401

+38.212

+38.172

+38.214

+37.868

+38.093

+38.097
EL. TANAH ASLI (M)

EL. MUKA SALURAN (M)


EKSISTING

EL. DASAR SALURAN (M) NAMA GAMBAR SKALA GAMBAR

LONG SECTION RUAS KANAN V = 1:100


JL.TRANS DESA SIBEDI H = 1 : 2000
DIMENSI SALURAN (M)
+42.694 +43.194
+42.651 +43.151

+42.005 +42.505

+40.791 +41.291

+40.171 +40.671

+39.346 +39.846

+38.732 +39.232

+37.125 +37.625

+37.187 +37.687

+37.249 +37.749

+37.311 +37.811

+37.373 +37.873

+37.435 +37.935

+37.497 +37.997
+37.5

EL. MUKA SALURAN (M)


RENCANA

+37

EL. DASAR SALURAN (M)

NO. LEMBAR : JML. LEMBAR :


LA = 0.60 m LA = 0.60 m LA = 0.60 m LA = 0.60 m LA = 0.60 m LA = 0.60 m LA = 0.60 m LA = 0.60 m LA = 0.60 m LA = 0.60 m LA = 0.60 m LA = 0.60 m
DIMENSI SALURAN (M) LB = 0.40 m LB = 0.40 m LB = 0.40 m LB = 0.40 m LB = 0.40 m LB = 0.40 m LB = 0.40 m LB = 0.40 m LB = 0.40 m LB = 0.40 m LB = 0.40 m LB = 0.40 m
H = 0.50 m H = 0.50 m H = 0.50 m H = 0.50 m H = 0.50 m H = 0.50 m H = 0.50 m H = 0.50 m H = 0.50 m H = 0.50 m H = 0.50 m H = 0.50 m

LONG SECTION RUAS KIRI JL. TRANS DESA SIBEDI


Skala H 1:2000
02 02
V 1:100
CROSS SECTION JALAN TRANS DESA SIBEDI
PEMERINTAH DAERAH
KABUPATEN SIGI
DINAS PEKERJAAN UMUM DAN PERUMAHAN

KEGIATAN :

44 44 PEKERJAAN :

PENYUSUNAN MASTER PLAN DAN


DED DRAINASE KEC. MARAWOLA
43 43
LOKASI :

type A type A type A type A


42 42 DESA SIBEDI

KETERANGAN :

41 41

40 40

39 39

MENYETUJUI :
38 38
PEJABAT PELAKSANA TEKNIS KEGIATAN
( PPTK )
JARAK PATOK (m) 2.5 4.6 2.5 JARAK PATOK (m) 2.5 4.6 2.5
+43.294

+43.486

+43.575

+43.357

+43.251

+43.427

+43.358
+43.49
ELEVASI (m) ELEVASI (m)
........................................
NIP. ......................

TIM TEKNIS TTD


CROSS SECTION TITIK P0 CROSS SECTION TITIK P1
Skala 1:100 Skala 1:100

44 44

43 43
KONSULTAN PERENCANA :

42 42
type A type A
41 41 type A
DIRENCANA : DIGAMBAR :
type A
40 40

39 39
NAMA GAMBAR SKALA GAMBAR

38 38
CROSS SECTION JALAN V = 1 : 100
JARAK PATOK (m) 2.5 4.6 2.5 JARAK PATOK (m) 2.5 4.6 2.5 TRANS DESA SIBEDI H = 1 : 100
+42.605

+42.638

+42.709

+41.391

+41.855

+42.093
+42.76

+42.07
ELEVASI (m) ELEVASI (m)

CROSS SECTION TITIK P2 CROSS SECTION TITIK P3 NO. LEMBAR : JML. LEMBAR :
Skala 1:100 Skala 1:100

01 04
PEMERINTAH DAERAH
KABUPATEN SIGI
DINAS PEKERJAAN UMUM DAN PERUMAHAN

KEGIATAN :

44 44 PEKERJAAN :

PENYUSUNAN MASTER PLAN DAN


DED DRAINASE KEC. MARAWOLA
43 43
LOKASI :

42 42 DESA SIBEDI

KETERANGAN :

41 41

40 type A 40
type A
39 39
type A
type A
MENYETUJUI :
38 38
PEJABAT PELAKSANA TEKNIS KEGIATAN
( PPTK )
JARAK PATOK (m) 2.5 4.6 2.5 JARAK PATOK (m) 2.5 4.6 2.5
+40.771

+41.053

+41.121

+39.946

+40.088

+40.152

+40.182
+41.08
ELEVASI (m) ELEVASI (m)
........................................
NIP. ......................

TIM TEKNIS TTD


CROSS SECTION TITIK P4 CROSS SECTION TITIK P5
Skala 1:100 Skala 1:100

42 42

41 41
KONSULTAN PERENCANA :

40 40

39 39
DIRENCANA : DIGAMBAR :

type D type A
38 38

type A
37 37 type D NAMA GAMBAR SKALA GAMBAR

36 36
CROSS SECTION JALAN V = 1 : 100
JARAK PATOK (m) 2.5 4.6 2.5 JARAK PATOK (m) 2.5 4.6 2.5 TRANS DESA SIBEDI H = 1 : 100
+39.332

+39.329

+39.445

+39.504

+38.114

+38.602

+38.435
+38.58
ELEVASI (m) ELEVASI (m)

CROSS SECTION TITIK P6 CROSS SECTION TITIK P7 NO. LEMBAR : JML. LEMBAR :
Skala 1:100 Skala 1:100

02 04
PEMERINTAH DAERAH
KABUPATEN SIGI
DINAS PEKERJAAN UMUM DAN PERUMAHAN

KEGIATAN :

42 42 PEKERJAAN :

PENYUSUNAN MASTER PLAN DAN


DED DRAINASE KEC. MARAWOLA
41 41
LOKASI :

40 40 DESA SIBEDI

KETERANGAN :

39 39

38 38

type A type A
type A type A
37 37

MENYETUJUI :
36 36
PEJABAT PELAKSANA TEKNIS KEGIATAN
( PPTK )
JARAK PATOK (m) 2.5 4.6 2.5 JARAK PATOK (m) 2.5 4.6 2.5
+38.401

+38.372

+38.212

+38.341

+38.542

+38.613
+38.57

+38.64
ELEVASI (m) ELEVASI (m)
........................................
NIP. ......................

TIM TEKNIS TTD


CROSS SECTION TITIK P8 CROSS SECTION TITIK P9
Skala 1:100 Skala 1:100

42 42

41 41
KONSULTAN PERENCANA :

40 40

39 39
DIRENCANA : DIGAMBAR :

38 38

type A type A type A


37 type A 37
NAMA GAMBAR SKALA GAMBAR

36 36
CROSS SECTION JALAN V = 1 : 100
JARAK PATOK (m) 2.5 4.6 2.5 JARAK PATOK (m) 2.5 4.6 2.5 TRANS DESA SIBEDI H = 1 : 100
+38.172

+38.237

+38.245

+38.168

+38.214

+38.208

+38.248

+38.343
ELEVASI (m) ELEVASI (m)

CROSS SECTION TITIK P10 CROSS SECTION TITIK P11 NO. LEMBAR : JML. LEMBAR :
Skala 1:100 Skala 1:100

03 04
PEMERINTAH DAERAH
KABUPATEN SIGI
DINAS PEKERJAAN UMUM DAN PERUMAHAN

KEGIATAN :

42 42 PEKERJAAN :

PENYUSUNAN MASTER PLAN DAN


DED DRAINASE KEC. MARAWOLA
41 41
LOKASI :

40 40 DESA SIBEDI

KETERANGAN :

39 39

38 38

type A type A
37
type A 37 type A
MENYETUJUI :
36 36
PEJABAT PELAKSANA TEKNIS KEGIATAN
( PPTK )
JARAK PATOK (m) 2.5 4.6 2.5 JARAK PATOK (m) 2.5 4.6 2.5
+37.868

+37.993

+38.186

+38.226

+38.093

+38.123

+38.359

+38.441
ELEVASI (m) ELEVASI (m)
........................................
NIP. ......................

TIM TEKNIS TTD


CROSS SECTION TITIK P12 CROSS SECTION TITIK P13
Skala 1:100 Skala 1:100

42

41
KONSULTAN PERENCANA :

40

39
DIRENCANA : DIGAMBAR :

38

37 type A type A
NAMA GAMBAR SKALA GAMBAR

36
CROSS SECTION JALAN V = 1 : 100
JARAK PATOK (m) 2.5 4.6 2.5 TRANS DESA SIBEDI H = 1 : 100
+38.097

+38.134

+38.122
+38.06

ELEVASI (m)

CROSS SECTION TITIK P14 NO. LEMBAR : JML. LEMBAR :


Skala 1:100

04 04
LONG SECTION JALAN BUU TANDA DESA SIBEDI
ARAH PALU
STA AWAL (0+000)

JALAN TRANS DESA SIBEDI


PEMERINTAH DAERAH
P0 KABUPATEN SIGI
P2
P1 DINAS PEKERJAAN UMUM DAN PERUMAHAN
P3
P4
P5 JALAN BUU KEGIATAN :
TANDA
P6 STA AKHIR (0+445.88)
P7
P8 P9
P10
PEKERJAAN :

ARAH KULAWI
PENYUSUNAN MASTER PLAN DAN
DED DRAINASE KEC. MARAWOLA

LOKASI :

DESA SIBEDI

KETERANGAN :

62.00 51.00

61.00 Elev. Tanah Asli 50.00


Elev. Tanah Asli

Elev. Muka Saluran Rencana


60.00 49.00 Elev. Muka Saluran Rencana

59.00 Elev. Dasar Saluran Rencana 48.00 Elev. Dasar Saluran Rencana
LONG SECTION RUAS KANAN JL. BUU TANDA DESA SIBEDI MENYETUJUI :
Skala H 1:2000
58.00 47.00 V 1:100 PEJABAT PELAKSANA TEKNIS KEGIATAN
( PPTK )

57.00 46.00

56.00 45.00
........................................
NIP. ......................
55.00 44.00
TIM TEKNIS TTD

54.00 43.00

53.00 42.00

52.00 41.00

KONSULTAN PERENCANA :
51.00 40.00

NOMOR PATOK (M) P0 P1 P2 P3 P4 P5 P6 P7 P8 P9 P10

JARAK PATOK (M) 49.56 49.42 50 49.97 49.92 50 50 49.98 44.48 2.56
DIRENCANA : DIGAMBAR :

JARAK LANGSUNG (M) 0 49.56 98.98 148.98 198.94 248.86 298.86 348.86 398.84 443.32 445.88
+61.692

+59.118

+56.218

+53.671

+50.903

+48.718

+44.274

+41.781

+39.928
+39.822
+46.06
EL. TANAH ASLI (M)

EL. MUKA SALURAN (M) NAMA GAMBAR SKALA GAMBAR


EKSISTING

EL. DASAR SALURAN (M) LONG SECTION RUAS KANAN V = 1:100


JL.BUU TANDA DESA SIBEDI H = 1 : 2000

DIMENSI SALURAN (M)


+60.892 +61.492

+58.318 +58.918

+55.418 +56.018

+52.871 +53.471

+50.103 +50.703

+47.918 +48.518

+43.474 +44.074

+40.981 +41.581

+39.128 +39.728
+39.022 +39.622
+45.86

EL. MUKA SALURAN (M)

NO. LEMBAR : JML. LEMBAR :


+45.26
RENCANA

EL. DASAR SALURAN (M)

LA = 0.90 m LA = 0.90 m LA = 0.90 m LA = 0.90 m LA = 0.90 m LA = 0.90 m LA = 0.90 m LA = 0.90 m LA = 0.90 m


DIMENSI SALURAN (M) LB = 0.70 m
H = 0.60 m
LB = 0.70 m
H = 0.60 m
LB = 0.70 m
H = 0.60 m
LB = 0.70 m
H = 0.60 m
LB = 0.70 m
H = 0.60 m
LB = 0.70 m
H = 0.60 m
LB = 0.70 m
H = 0.60 m
LB = 0.70 m
H = 0.60 m
LB = 0.70 m
H = 0.60 m
01 02
ARAH PALU
JALAN TRANS DESA SIBEDI
P0
P2
P1
STA AWAL (0+000) P3
P4 PEMERINTAH DAERAH
P5 KABUPATEN SIGI
P6
P7 DINAS PEKERJAAN UMUM DAN PERUMAHAN
P8
P9 P10

JALAN BUU KEGIATAN :


TANDA STA AKHIR (0+444.38)

PEKERJAAN :

ARAH KULAWI
PENYUSUNAN MASTER PLAN DAN
DED DRAINASE KEC. MARAWOLA

LOKASI :

DESA SIBEDI
62.00 51.00
KETERANGAN :

61.00 Elev. Muka Saluran Rencana 50.00

60.00
Elev. Dasar Saluran Rencana
49.00 LONG SECTION RUAS KIRI JL. BUU TANDA DESA SIBEDI
Skala H 1:2000
Elev. Tanah Asli V 1:100
59.00 48.00

58.00 47.00
MENYETUJUI :

Elev. Tanah Asli


57.00 46.00 PEJABAT PELAKSANA TEKNIS KEGIATAN
( PPTK )
Elev. Muka Saluran Rencana
56.00 45.00

55.00 44.00 Elev. Dasar Saluran Rencana


........................................
NIP. ......................
54.00 43.00
TIM TEKNIS TTD

53.00 42.00

52.00 41.00

51.00 40.00

KONSULTAN PERENCANA :
50.00 39.00

NOMOR PATOK (M) P0 P1 P2 P3 P4 P5 P6 P7 P8 P9 P10

JARAK PATOK (M) 0 49.45 49.37 50 49.96 49.92 50 50 49.98 43.34 2.35
DIRENCANA : DIGAMBAR :

JARAK LANGSUNG (M) 0 49.45 98.82 148.82 198.79 248.71 298.71 348.71 398.68 442.03 444.38
+61.433

+58.701

+56.097

+53.733

+48.655

+46.271

+44.099

+41.934

+39.776
+50.78

+39.95
EL. TANAH ASLI (M)

EL. MUKA SALURAN (M) NAMA GAMBAR SKALA GAMBAR


EKSISTING

EL. DASAR SALURAN (M) LONG SECTION RUAS KANAN V = 1:100


JL.BUU TANDA DESA SIBEDI H = 1 : 2000

DIMENSI SALURAN (M)


+60.033 +61.233

+57.301 +58.501

+54.697 +55.897

+52.333 +53.533

+47.255 +48.455

+44.871 +46.071

+42.699 +43.899

+40.534 +41.734

+38.376 +39.576
+50.58

+38.55 +39.75
EL. MUKA SALURAN (M)

NO. LEMBAR : JML. LEMBAR :


+49.38
RENCANA

EL. DASAR SALURAN (M)

LA = 1.20 m LA = 1.20 m LA = 1.20 m LA = 1.20 m LA = 1.20 m LA = 1.20 m LA = 1.20 m LA = 1.20 m LA = 1.20 m


DIMENSI SALURAN (M) LB = 1.00 m
H = 1.20 m
LB = 1.00 m
H = 1.20 m
LB = 1.00 m
H = 1.20 m
LB = 1.00 m
H = 1.20 m
LB = 1.00 m
H = 1.20 m
LB = 1.00 m
H = 1.20 m
LB = 1.00 m
H = 1.20 m
LB = 1.00 m
H = 1.20 m
LB = 1.00 m
H = 1.20 m
02 02
CROSS SECTION JALAN BUU TANDA DESA SIBEDI
PEMERINTAH DAERAH
KABUPATEN SIGI
DINAS PEKERJAAN UMUM DAN PERUMAHAN

KEGIATAN :
62

61 PEKERJAAN :

PENYUSUNAN MASTER PLAN DAN


type B DED DRAINASE KEC. MARAWOLA
60 type C 60
LOKASI :

59 59 DESA SIBEDI

KETERANGAN :

58 58
type B type C
57 57

56 56

MENYETUJUI :
55 55
PEJABAT PELAKSANA TEKNIS KEGIATAN
( PPTK )
JARAK PATOK (m) 2 3.5 2 JARAK PATOK (m) 2 3.5 2
+61.433

+61.442

+61.445

+61.692

+58.701

+58.777

+58.991

+59.118
ELEVASI (m) ELEVASI (m)
........................................
NIP. ......................

TIM TEKNIS TTD


CROSS SECTION TITIK P0 CROSS SECTION TITIK P1
Skala 1:100 Skala 1:100

KONSULTAN PERENCANA :

54

59 53
type B DIRENCANA : DIGAMBAR :

58 52 type C

57 type B 51
NAMA GAMBAR SKALA GAMBAR
type C
56 50
CROSS SECTION V = 1 : 100
JARAK PATOK (m) 2 3.5 2 JARAK PATOK (m) 2 3.5 2 JALAN BUU TANDA DESA
SIBEDI
H = 1 : 100
+56.097

+56.136

+56.218

+53.733

+53.689

+53.661

+53.671
+56.11

ELEVASI (m) ELEVASI (m)

CROSS SECTION TITIK P2 CROSS SECTION TITIK P3 NO. LEMBAR : JML. LEMBAR :

Skala 1:100 Skala 1:100

01 03
PEMERINTAH DAERAH
KABUPATEN SIGI
DINAS PEKERJAAN UMUM DAN PERUMAHAN

KEGIATAN :

51 PEKERJAAN :

PENYUSUNAN MASTER PLAN DAN


DED DRAINASE KEC. MARAWOLA
50
type B LOKASI :

type C
49 49 DESA SIBEDI

KETERANGAN :

48 48
type B
47 47 type C

46 46

MENYETUJUI :
45 45
PEJABAT PELAKSANA TEKNIS KEGIATAN
( PPTK )
JARAK PATOK (m) 2 3.5 2 JARAK PATOK (m) 2 3.5 2
+50.804

+50.865

+50.903

+48.655

+48.694

+48.801

+48.718
+50.78

ELEVASI (m) ELEVASI (m)


........................................
NIP. ......................

TIM TEKNIS TTD


CROSS SECTION TITIK P4 CROSS SECTION TITIK P5
Skala 1:100 Skala 1:100

47
KONSULTAN PERENCANA :

46

45
type B 45
DIRENCANA : DIGAMBAR :
type C
44 44

43 43 type B
type C NAMA GAMBAR SKALA GAMBAR

42 42
CROSS SECTION V = 1 : 100
JARAK PATOK (m) 2 3.5 2 JARAK PATOK (m) 2 3.5 2 JALAN BUU TANDA DESA
SIBEDI
H = 1 : 100
+46.271

+46.178

+46.061

+44.099

+44.036

+44.165

+44.274
+46.06

ELEVASI (m) ELEVASI (m)

CROSS SECTION TITIK P6 CROSS SECTION TITIK P7 NO. LEMBAR : JML. LEMBAR :

Skala 1:100 Skala 1:100

02 03
PEMERINTAH DAERAH
KABUPATEN SIGI
DINAS PEKERJAAN UMUM DAN PERUMAHAN

KEGIATAN :

PEKERJAAN :

PENYUSUNAN MASTER PLAN DAN


DED DRAINASE KEC. MARAWOLA

LOKASI :

42 DESA SIBEDI

KETERANGAN :

41
type B

40
type C 40

39 39
type B
38 38
type C MENYETUJUI :

PEJABAT PELAKSANA TEKNIS KEGIATAN


( PPTK )
JARAK PATOK (m) 2 3.5 2 JARAK PATOK (m) 2 3.5 2
+41.934

+41.791

+41.789

+41.781

+39.922

+39.952

+39.928
+39.95
ELEVASI (m) ELEVASI (m)
........................................
NIP. ......................

TIM TEKNIS TTD


CROSS SECTION TITIK P8 CROSS SECTION TITIK P9
Skala 1:100 Skala 1:100

KONSULTAN PERENCANA :

DIRENCANA : DIGAMBAR :

40

39
type B NAMA GAMBAR SKALA GAMBAR

38 type C
CROSS SECTION V = 1 : 100
JARAK PATOK (m) 2 3.5 2 JALAN BUU TANDA DESA
SIBEDI
H = 1 : 100
+39.776

+39.789

+39.872

+39.822

ELEVASI (m)

CROSS SECTION TITIK P10 NO. LEMBAR : JML. LEMBAR :

Skala 1:100

03 03
DETAIL DRAINASE DAN BOX CULVERT
DESA SIBEDI
PEMERINTAH DAERAH
KABUPATEN SIGI
DINAS PEKERJAAN UMUM DAN PERUMAHAN

20 120 20
KEGIATAN :

90
Muka tanah Muka tanah
20 50 20

PEKERJAAN :

Muka tanah Muka tanah PENYUSUNAN MASTER PLAN DAN


DED DRAINASE KEC. MARAWOLA

Plesteran 50 50 Plesteran
LOKASI :
Pas: Batu Kali Pas: Batu Kali 120

DESA SIBEDI
Lantai Beton Cor T. 7 Cm 7
Urugan Pasir T. 5 Cm 5 KETERANGAN :
25
13

20 40 20

80 Lantai Beton Cor T. 10 Cm 10


Urugan Pasir T. 5 Cm 5
5
Detail Saluran Type 40x50x60 (TYPE A)
30 100 30
Skala 1:25
160
MENYETUJUI :

Detail Saluran Type 100x120x120 (TYPE C) PEJABAT PELAKSANA TEKNIS KEGIATAN


( PPTK )
Skala 1:25

........................................
NIP. ......................

TIM TEKNIS TTD


20 160 20
130
20 90 20

Muka tanah Muka tanah

Plesteran Muka tanah Muka tanah

Pas: Batu Kali 60

85
KONSULTAN PERENCANA :

Lantai Beton Cor T. 7 Cm 7


Urugan Pasir T. 5 Cm 5 140
13

Plesteran DIRENCANA : DIGAMBAR :


20 70 20
Pas: Batu Kali
110

Detail Saluran Type 70x60x90 (TYPE B)


NAMA GAMBAR SKALA GAMBAR
Skala 1:25 Lantai Beton Cor T. 10 Cm 10
Urugan Pasir T. 5 Cm 5
5 TYPE DETAIL DRAINASE 1 : 25
DESA SIBEDI
30 139 30

Detail Saluran Type 140x140x160 (TYPE D)


Skala 1:25

NO. LEMBAR : JML. LEMBAR :

01 02
PEMERINTAH DAERAH
KABUPATEN SIGI
DINAS PEKERJAAN UMUM DAN PERUMAHAN
A Panjang Box Culvert
Aspal
KEGIATAN :

20

PEKERJAAN :

PENYUSUNAN MASTER PLAN DAN


DED DRAINASE KEC. MARAWOLA

LOKASI :

Panjang Box Culvert


DESA SIBEDI
190 150

KETERANGAN :
B B

Lantai Kerja (B0)


Pasir Urug

20

20 20
A MENYETUJUI :

5 10 PEJABAT PELAKSANA TEKNIS KEGIATAN


Denah Box Culvert 150x150 ( PPTK )
Skala 1:30
Potongan A - A
Skala 1:30

........................................
NIP. ......................

TIM TEKNIS TTD

20 150 20

TABEL PEMBESIAN BOX CULVERT TYPE 150.150 20 150 20

GAMBAR PANJANG TYPE TUL. 20 20

KONSULTAN PERENCANA :

a a = 15.00 cm
b
b = 185.00 cm

a
DIRENCANA : DIGAMBAR :
a = 15.00 cm
150 190 150 190
b b = 185.00 cm

NAMA GAMBAR SKALA GAMBAR


b
b = 57.73 cm
BETON K300
Denah Box Culvert 150x150 1 : 30
BOX CULVERT
Potongan A-A 1 : 30
a. Badan= 72 bh 20 20 Potongan B-B 1 : 30
5 5 Lantai Kerja (B0)
Detail Penulangan 1 : 30
5 5 Urugan Pasir Box Culvert 150x150
190 190

Potongan B - B
Skala 1:30
Detail Penulangan Box Culvert 150x150
Skala 1:30
NO. LEMBAR : JML. LEMBAR :

02 02
LONG SECTION JALAN TRANS DESA KOTARINDAU
PEMERINTAH DAERAH
KABUPATEN SIGI
DINAS PEKERJAAN UMUM DAN PERUMAHAN

Masjid Apotik KEGIATAN :


Alkhairaat Mutiara

ARAH KULAWI Jalan Trans Palu-Kulawi


ARAH PALU PEKERJAAN :

P0 P1 P2 P3 P4 P5 P7 P8 PENYUSUNAN MASTER PLAN DAN


P9 P10 P11 P14 P15 DED DRAINASE KEC. MARAWOLA
P6

Jl. T
P12

upu
P13

S oa
LOKASI :

DESA SIBEDI

KETERANGAN :

Elev. Tanah Asli


Elev. Dasar Saluran Eksisting Elev. Muka Saluran Rencana
Rencana
Box Culvert 1.5x1.5 MENYETUJUI :
Rencana Rencana
Box Culvert 1.5x1.5 Box Culvert 1.5x1.5 PEJABAT PELAKSANA TEKNIS KEGIATAN
( PPTK )
Elev. Dasar Saluran Rencana
23.00

22.00

21.00 ........................................
NIP. ......................

TIM TEKNIS TTD


20.00

19.00

5.16 P11
4 P12
P13
NOMOR PATOK (M) P0 P1 P2 P3 P4 P5 P6 P7 P8 P9 P10 P14 P15

JARAK PATOK (M) 50 50 50 50 24.47 4.31 50 50 50 50 40.84 13.96


21.23
KONSULTAN PERENCANA :
224.47 450
JARAK LANGSUNG (M) 0 50 100 150 200 250 300 350 400 455.16 500 513.96
228.78 459.17
+22.155 +22.755

+21.386 +21.986

+21.717

+21.814

+22.165
+22.035

+21.903

+21.616

+21.508

+21.419

+21.406
+21.405
+21.396

+21.391

+21.336
+22.49

EL. TANAH ASLI (M)


+21.89

EL. MUKA SALURAN (M) DIRENCANA : DIGAMBAR :


EKSISTING

EL. DASAR SALURAN (M)

LA = 0.80 m LA = 0.80 m
DIMENSI SALURAN (M) LB = 0.60 m LB = 0.60 m NAMA GAMBAR SKALA GAMBAR
H = 0.50 m H = 0.50 m

LONG SECTION RUAS KANAN V = 1:100


JL.TRANS KOTARINDAU H = 1 : 2000
+22.66

+22.39

+22.26

+22.04

+21.81

+21.76
+21.75

+21.52

+21.41

+21.32

+21.31
+21.31

+21.29

+21.24
+21.7

+21.3
EL. MUKA SALURAN (M)
+21.06

+20.79

+20.66

+20.44

+20.21

+20.16
+20.15

+19.92

+19.81

+19.72

+19.71
+19.71

+19.69

+19.64
RENCANA

+20.1

+19.7
EL. DASAR SALURAN (M)

DIMENSI SALURAN (M) H = 1.60 m H = 1.60 m H = 1.60 m H = 1.60 m H = 1.60 m H = 1.60 m H = 1.60 m H = 1.60 m H = 1.60 m H = 1.60 m H = 1.60 m
L = 1.20 m L = 1.20 m L = 1.20 m L = 1.20 m L = 1.20 m L = 1.20 m L = 1.20 m L = 1.20 m L = 1.20 m L = 1.20 m L = 1.20 m

NO. LEMBAR : JML. LEMBAR :

LONG SECTION RUAS KANAN JL. TRANS DESA KOTARINDAU


Skala H 1:2000
V 1:100

01 02
PEMERINTAH DAERAH
KABUPATEN SIGI
DINAS PEKERJAAN UMUM DAN PERUMAHAN

Masjid KEGIATAN :
Alkhairaat Apotik
P0 P1 P2 P3 P4 P5 P6 Mutiara
P7 P8 P9 P10 P11

Jalan Trans Palu-Kulawi


PEKERJAAN :

PENYUSUNAN MASTER PLAN DAN


ARAH KULAWI DED DRAINASE KEC. MARAWOLA
ARAH PALU

Jl. T
upu
S oa
LOKASI :

DESA SIBEDI

KETERANGAN :

Elev. Tanah Asli

Elev. Muka Saluran Rencana MENYETUJUI :


Rencana
Box Culvert 1.5x1.5 PEJABAT PELAKSANA TEKNIS KEGIATAN
23.00 Elev. Dasar Saluran Rencana ( PPTK )

22.00

21.00
........................................
NIP. ......................

20.00 TIM TEKNIS TTD

19.00

NOMOR PATOK (M) P0 P1 P2 P3 P4 P5 P6 P7 P8 P9 P10 P11

JARAK PATOK (M) 50 50 50 50 50 50 50 50 50 50 13.96

JARAK LANGSUNG (M) 0 50 100 150 200 250 300 350 400 450 500 513.96 KONSULTAN PERENCANA :
+22.678

+22.401

+22.199

+22.256

+21.922

+21.404

+21.226

+21.173
+22.71

+21.63

+21.05
+21.1
EL. TANAH ASLI (M)

EL. MUKA SALURAN (M)


EKSISTING

DIRENCANA : DIGAMBAR :

EL. DASAR SALURAN (M)

DIMENSI SALURAN (M)


NAMA GAMBAR SKALA GAMBAR
+22.61

+22.58

+21.82

+21.53

+21.13

+21.07

+20.95
LONG SECTION RUAS KIRI V = 1:100
+22.3

+22.1

+21.3
+22

+21
EL. MUKA SALURAN (M) JL.TRANS KOTARINDAU H = 1 : 2000
+21.61

+21.58

+20.82

+20.53

+20.13

+20.07

+19.95
RENCANA

+21.3

+21.1

+20.3
+21

+20
EL. DASAR SALURAN (M)

DIMENSI SALURAN (M) H = 1.00 m H = 1.00 m H = 1.00 m H = 1.00 m H = 1.00 m H = 1.00 m H = 1.00 m H = 1.00 m H = 1.00 m H = 1.00 m
L = 0.80 m L = 0.80 m L = 0.80 m L = 0.80 m L = 0.80 m L = 0.80 m L = 0.80 m L = 0.80 m L = 0.80 m L = 0.80 m

LONG SECTION RUAS KIRI JL. TRANS DESA KOTARINDAU NO. LEMBAR : JML. LEMBAR :

Skala H 1:2000
V 1:100

02 02
CROSS SECTION JALAN TRANS DESA KOTARINDAU
PEMERINTAH DAERAH
KABUPATEN SIGI
DINAS PEKERJAAN UMUM DAN PERUMAHAN

KEGIATAN :

23 23

PEKERJAAN :
22 22
PENYUSUNAN MASTER PLAN DAN
DED DRAINASE KEC. MARAWOLA
U-DITCH U-DITCH
80 x 100 80 x 100
21 21 LOKASI :
U-DITCH
120 x 160 U-DITCH
120 x 160 DESA SIBEDI
20 20
KETERANGAN :

19 19

18 18

JARAK PATOK (m) 2.5 4.5 2.5 JARAK PATOK (m) 2.5 4.5 2.5
+22.726

+22.755

+22.678

+22.719

+22.467
+22.71

+22.75

+22.49
MENYETUJUI :

ELEVASI (m) ELEVASI (m) PEJABAT PELAKSANA TEKNIS KEGIATAN


( PPTK )

CROSS SECTION TITIK P0 CROSS SECTION TITIK P1


Skala 1:100 Skala 1:100
........................................
NIP. ......................

TIM TEKNIS TTD

23 23

22 22
KONSULTAN PERENCANA :

21 U-DITCH 21
80 x 100 U-DITCH
80 x 100

20 U-DITCH 20
120 x 160 U-DITCH DIRENCANA : DIGAMBAR :
120 x 160
19 19

18 18
NAMA GAMBAR SKALA GAMBAR

JARAK PATOK (m) 2.5 4.5 2.5 JARAK PATOK (m) 2.5 4.5 2.5
CROSS SECTION V = 1 : 100
+22.401

+22.469

+21.986

+22.199

+22.331

+22.082

+21.717
JALAN TRANS KOTARINDAU H = 1 : 100
+22.38

ELEVASI (m) ELEVASI (m)

CROSS SECTION TITIK P2 CROSS SECTION TITIK P3


Skala 1:100 Skala 1:100
NO. LEMBAR : JML. LEMBAR :

01 03
PEMERINTAH DAERAH
KABUPATEN SIGI
DINAS PEKERJAAN UMUM DAN PERUMAHAN

KEGIATAN :

23 23

PEKERJAAN :
22 22
PENYUSUNAN MASTER PLAN DAN
DED DRAINASE KEC. MARAWOLA

21 U-DITCH 21 LOKASI :
80 x 100 U-DITCH
80 x 100 DESA SIBEDI
20 U-DITCH 20 U-DITCH
120 x 160 120 x 160 KETERANGAN :

19 19

18 18

JARAK PATOK (m) 2.5 4.5 2.5 JARAK PATOK (m) 2.5 4.5 2.5
+22.256

+22.301

+22.227

+21.814

+21.922

+22.036

+22.004

+21.903
MENYETUJUI :

ELEVASI (m) ELEVASI (m) PEJABAT PELAKSANA TEKNIS KEGIATAN


( PPTK )

CROSS SECTION TITIK P4 CROSS SECTION TITIK P5


Skala 1:100 Skala 1:100
........................................
NIP. ......................

TIM TEKNIS TTD

23 23

22 22
KONSULTAN PERENCANA :

21 21

U-DITCH
20 80 x 100 20 U-DITCH
80 x 100
U-DITCH U-DITCH DIRENCANA : DIGAMBAR :
120 x 160 120 x 160
19 19

18 18
NAMA GAMBAR SKALA GAMBAR

JARAK PATOK (m) 2.5 4.5 2.5 JARAK PATOK (m) 2.5 4.5 2.5
CROSS SECTION V = 1 : 100
+21.856

+21.791

+21.616

+21.404

+21.676

+21.684

+21.508
JALAN TRANS KOTARINDAU H = 1 : 100
+21.63

ELEVASI (m) ELEVASI (m)

CROSS SECTION TITIK P6 CROSS SECTION TITIK P7


Skala 1:100 Skala 1:100
NO. LEMBAR : JML. LEMBAR :

02 03
PEMERINTAH DAERAH
KABUPATEN SIGI
DINAS PEKERJAAN UMUM DAN PERUMAHAN

KEGIATAN :

23 23

PEKERJAAN :
22 22
PENYUSUNAN MASTER PLAN DAN
DED DRAINASE KEC. MARAWOLA

21 21 LOKASI :

DESA SIBEDI
20 U-DITCH 20 U-DITCH
80 x 100 80 x 100 KETERANGAN :
U-DITCH U-DITCH
120 x 160 120 x 160
19 19

18 18

JARAK PATOK (m) 2.5 4.5 2.5 JARAK PATOK (m) 2.5 4.5 2.5
+21.226

+21.529

+21.575

+21.419

+21.173

+21.366

+21.377

+21.406
MENYETUJUI :

ELEVASI (m) ELEVASI (m) PEJABAT PELAKSANA TEKNIS KEGIATAN


( PPTK )

CROSS SECTION TITIK P8 CROSS SECTION TITIK P9


Skala 1:100 Skala 1:100
........................................
NIP. ......................

TIM TEKNIS TTD

23 23

22 22
KONSULTAN PERENCANA :

21 21

20 20
U-DITCH U-DITCH DIRENCANA : DIGAMBAR :
80 x 100 80 x 100
U-DITCH U-DITCH
120 x 160 120 x 160
19 19

18 18
NAMA GAMBAR SKALA GAMBAR

JARAK PATOK (m) 2.5 4.5 2.5 JARAK PATOK (m) 2.5 4.5 2.5
CROSS SECTION V = 1 : 100
+21.357

+21.466

+21.391

+21.403

+21.336
JALAN TRANS KOTARINDAU H = 1 : 100

+21.05

+21.36
+21.1

ELEVASI (m) ELEVASI (m)

CROSS SECTION TITIK P10 CROSS SECTION TITIK P11


Skala 1:100 Skala 1:100
NO. LEMBAR : JML. LEMBAR :

03 03
LONG SECTION JALAN TRANS DESA KOTAPULU
PEMERINTAH DAERAH
KABUPATEN SIGI
DINAS PEKERJAAN UMUM DAN PERUMAHAN
LAPANGAN DOLO

KANTOR BUPATI
KEGIATAN :

Jl. PS. Dolo


PEKERJAAN :
P13
Jl. Trans Sulawesi P12
PENYUSUNAN MASTER PLAN DAN
P11
P0 DED DRAINASE KEC. MARAWOLA
P1 P2 P3 P10
P4 P5 P6 P7 P9 LOKASI :
P8
ARAH PALU ARAH KULAWI

pevavo
DESA SIBEDI

Jl. Pem
KETERANGAN :

Rencana Box Culvert


Rencana Box Culvert Elev. Tanah Asli 1.00x1.00
27.00
1.00x1.00 Elev. Muka Saluran Rencana
Elev. Dasar Saluran Rencana MENYETUJUI :
26.00
PEJABAT PELAKSANA TEKNIS KEGIATAN
( PPTK )
25.00

24.00

........................................
23.00 NIP. ......................

TIM TEKNIS TTD


22.00

21.00

20.00

19.00
KONSULTAN PERENCANA :

NOMOR PATOK (M) P0 P1 P2 P3 P4 P5 P6 P7 P8 P9 P10 P11 P12 P13

JARAK PATOK (M) 52.59 4.58 51.99 50 50 52.74 2.02 45.24 49.62 50 49.99 50 33.73

261.9 DIRENCANA : DIGAMBAR :


JARAK LANGSUNG (M) 0 52.59 57.17 109.16 159.16 209.16 309.16 358.78 408.78 458.78 508.78 542.51
263.92
+25.80

+25.28
+25.36

+25.38

+25.43

+25.47

+25.58
+25.59

+25.83

+25.96

+26.02

+26.12

+26.16
+25.7
EL. TANAH ASLI (M)

EL. MUKA SALURAN (M)


EKSISTING

NAMA GAMBAR SKALA GAMBAR

EL. DASAR SALURAN (M)


LONG SECTION RUAS KANAN V = 1:100
JL.TRANS DESA KOTAPULU H = 1 : 2000
DIMENSI SALURAN (M)
+25.18
+25.26

+25.28

+25.33

+25.37

+25.48
+25.49

+25.73

+25.86

+25.92

+26.02

+26.06
+25.7

+25.6

EL. MUKA SALURAN (M)


+24.58
+24.66

+24.68

+24.73

+24.77

+24.88
+24.89

+25.13

+25.26

+25.32

+25.42

+25.46
RENCANA

+25.1

+25

EL. DASAR SALURAN (M) NO. LEMBAR : JML. LEMBAR :

H = 0.60 m H = 0.60 m H = 0.60 m H = 0.60 m H = 0.60 m H = 0.60 m H = 0.60 m H = 0.60 m H = 0.60 m H = 0.60 m H = 0.60 m
DIMENSI SALURAN (M)
L = 0.50 m L = 0.50 m L = 0.50 m L = 0.50 m L = 0.50 m L = 0.50 m L = 0.50 m L = 0.50 m L = 0.50 m L = 0.50 m L = 0.50 m

LONG SECTION RUAS KANAN JL. TRANS DESA KOTAPULU


1 02
Skala H 1:2000
V 1:100
PEMERINTAH DAERAH
KABUPATEN SIGI
DINAS PEKERJAAN UMUM DAN PERUMAHAN
LAPANGAN DOLO

KANTOR BUPATI
KEGIATAN :
P12
P11
P10
P0
P1 P2 P9
P3 P4

Jl. PS. Dolo


P5 P6 P8
P7 PEKERJAAN :
Jl. Trans Sulawesi
PENYUSUNAN MASTER PLAN DAN
DED DRAINASE KEC. MARAWOLA
ARAH PALU ARAH KULAWI
LOKASI :

pevavo
DESA SIBEDI

Jl. Pem
KETERANGAN :

Rencana Box Culvert


27.00 Elev. Tanah Asli 1.00x1.00 Elev. Dasar Saluran Eksisting
Rencana Box Culvert Elev. Muka Saluran Rencana
1.00x1.00
26.00 Elev. Dasar Saluran Rencana MENYETUJUI :

PEJABAT PELAKSANA TEKNIS KEGIATAN


25.00 ( PPTK )

24.00

23.00
........................................
NIP. ......................

22.00 TIM TEKNIS TTD

21.00

20.00

19.00
KONSULTAN PERENCANA :

NOMOR PATOK (M) P0 P1 P2 P3 P4 P5 P6 P7 P8 P9 P10 P11 P12

JARAK PATOK (M) 50 50 50 50 54.79 2.28 42.93 49.63 50 50 50 31.96

JARAK LANGSUNG (M) 0 50 100 150 200 254.79 300 349.62 399.62 449.62 499.62 531.57
257.07 DIRENCANA : DIGAMBAR :
+24.80

+24.76

+25.18

+25.22

+25.32

+25.51

+25.62

+25.65

+25.68

+25.69

+25.86

+26.08
+25.4
EL. TANAH ASLI (M)
+24.80

+24.16 +24.76

+24.58 +25.18

+24.62 +25.22

+24.72 +25.32

+24.91 +25.51

+25.02 +25.62

+25.05 +25.65

+25.08 +25.68

+25.09 +25.69

+25.26 +25.86

+25.48 +26.08
+24.8 +25.4

EL. MUKA SALURAN (M)


EKSISTING

NAMA GAMBAR SKALA GAMBAR


+24.2

EL. DASAR SALURAN (M)

LA = 0.80 m LA = 0.80 m LA = 0.80 m LA = 0.80 m LA = 0.80 m LA = 0.80 m LA = 0.80 m LA = 0.80 m LA = 0.80 m LA = 0.80 m LA = 0.80 m LONG SECTION RUAS KIRI V = 1:100
LB = 0.60 m LB = 0.60 m LB = 0.60 m LB = 0.60 m LB = 0.60 m LB = 0.60 m LB = 0.60 m LB = 0.60 m LB = 0.60 m LB = 0.60 m LB = 0.60 m JL.TRANS DESA KOTAPULU H = 1 : 2000
DIMENSI SALURAN (M)
H = 0.50 m H = 0.50 m H = 0.50 m H = 0.50 m H = 0.50 m H = 0.50 m H = 0.50 m H = 0.50 m H = 0.50 m H = 0.50 m H = 0.50 m
+24.70

+23.66 +24.66

+24.08 +25.08

+24.12 +25.12

+24.22 +25.22

+24.41 +25.41

+24.52 +25.52

+24.55 +25.55

+24.58 +25.58

+24.59 +25.59

+24.76 +25.76

+24.98 +25.98
+24.3 +25.3

EL. MUKA SALURAN (M)


RENCANA

+23.7

EL. DASAR SALURAN (M)


NO. LEMBAR : JML. LEMBAR :

H = 1.00 m H = 1.00 m H = 1.00 m H = 1.00 m H = 1.00 m H = 1.00 m H = 1.00 m H = 1.00 m H = 1.00 m H = 1.00 m H = 1.00 m
DIMENSI SALURAN (M) L = 0.80 m L = 0.80 m L = 0.80 m L = 0.80 m L = 0.80 m L = 0.80 m L = 0.80 m L = 0.80 m L = 0.80 m L = 0.80 m L = 0.80 m

LONG SECTION RUAS KIRI JL. TRANS DESA KOTAPULU


Skala H 1:2000
02 02
V 1:100
CROSS SECTION JALAN TRANS DESA KOTAPULU
PEMERINTAH DAERAH
KABUPATEN SIGI
DINAS PEKERJAAN UMUM DAN PERUMAHAN

KEGIATAN :

27 27

PEKERJAAN :
26 26
PENYUSUNAN MASTER PLAN DAN
DED DRAINASE KEC. MARAWOLA

25 U-DITCH 25 LOKASI :
50 x 60 U-DITCH
50 x 60 DESA SIBEDI
24 24
KETERANGAN :
U-DITCH U-DITCH
80 x 100 80 x 100
23 23

22 22

JARAK PATOK (m) 2.5 4.5 2.5 JARAK PATOK (m) 2.5 4.5 2.5
+25.805

+25.81

+24.76

+25.13

+25.36

+25.36
+24.8

+25.8
MENYETUJUI :

ELEVASI (m) ELEVASI (m) PEJABAT PELAKSANA TEKNIS KEGIATAN


( PPTK )

CROSS SECTION TITIK P0 CROSS SECTION TITIK P1


Skala 1:100 Skala 1:100
........................................
NIP. ......................

TIM TEKNIS TTD

27 27

26 26
KONSULTAN PERENCANA :

25 25
U-DITCH U-DITCH
50 x 60 50 x 60
24 U-DITCH 24 U-DITCH
80 x 100 80 x 100 DIRENCANA : DIGAMBAR :

23 23

22 22
NAMA GAMBAR SKALA GAMBAR

JARAK PATOK (m) 2.5 4.5 2.5 JARAK PATOK (m) 2.5 4.5 2.5
CROSS SECTION V = 1 : 100
+25.22

+25.36

+25.22

+25.36

+25.51
JALAN TRANS KOTAPULU H = 1 : 100
+25.18

+25.38

+25.43
ELEVASI (m) ELEVASI (m)

CROSS SECTION TITIK P2 CROSS SECTION TITIK P3


Skala 1:100 Skala 1:100
NO. LEMBAR : JML. LEMBAR :

01 03
PEMERINTAH DAERAH
KABUPATEN SIGI
DINAS PEKERJAAN UMUM DAN PERUMAHAN

KEGIATAN :

27 27

PEKERJAAN :
26 26
PENYUSUNAN MASTER PLAN DAN
DED DRAINASE KEC. MARAWOLA

25 25 LOKASI :
U-DITCH U-DITCH
50 x 60 50 x 60
U-DITCH U-DITCH DESA SIBEDI
24 80 x 100 24 80 x 100
KETERANGAN :

23 23

22 22
U-DITCH
JARAK
80 xPATOK
100 (m) 2.5 4.5 2.5 JARAK PATOK (m) 2.5 4.5 2.5

+25.58

+25.58

+25.51

+25.51

+25.59

+25.59
+25.4

+25.4

MENYETUJUI :

ELEVASI (m) ELEVASI (m) PEJABAT PELAKSANA TEKNIS KEGIATAN


( PPTK )

CROSS SECTION TITIK P4 CROSS SECTION TITIK P5


Skala 1:100 Skala 1:100
........................................
NIP. ......................

TIM TEKNIS TTD

27 27

26 26
KONSULTAN PERENCANA :

25 U-DITCH 25 U-DITCH
50 x 60 50 x 60
U-DITCH U-DITCH
80 x 100 80 x 100
24 24
DIRENCANA : DIGAMBAR :

23 23

22 22
NAMA GAMBAR SKALA GAMBAR

JARAK PATOK (m) 2.5 4.5 2.5 JARAK PATOK (m) 2.5 4.5 2.5
CROSS SECTION V = 1 : 100
JALAN TRANS KOTAPULU H = 1 : 100
+25.62

+25.44

+25.51

+25.65

+25.83
+25.7

+25.8

+25.9
ELEVASI (m) ELEVASI (m)

CROSS SECTION TITIK P6 CROSS SECTION TITIK P7


Skala 1:100 Skala 1:100
NO. LEMBAR : JML. LEMBAR :

02 03
PEMERINTAH DAERAH
KABUPATEN SIGI
DINAS PEKERJAAN UMUM DAN PERUMAHAN

KEGIATAN :

27 27

PEKERJAAN :
26 26
PENYUSUNAN MASTER PLAN DAN
DED DRAINASE KEC. MARAWOLA

U-DITCH U-DITCH
25 25 50 x 60 LOKASI :
50 x 60
U-DITCH U-DITCH
80 x 100 DESA SIBEDI
80 x 100
24 24
KETERANGAN :

23 23

22 22

JARAK PATOK (m) 2.5 4.5 2.5 JARAK PATOK (m) 2.5 4.5 2.5
+25.68

+25.81

+26.01

+25.96

+25.69

+25.81

+25.92

+26.02
MENYETUJUI :

ELEVASI (m) ELEVASI (m) PEJABAT PELAKSANA TEKNIS KEGIATAN


( PPTK )

CROSS SECTION TITIK P8 CROSS SECTION TITIK P9


Skala 1:100 Skala 1:100
........................................
NIP. ......................

TIM TEKNIS TTD

27 27

26 26
KONSULTAN PERENCANA :
U-DITCH
50 x 60
25 25
U-DITCH
U-DITCH 80 x 100
80 x 100
24 24
DIRENCANA : DIGAMBAR :

23 23

22 22
NAMA GAMBAR SKALA GAMBAR

JARAK PATOK (m) 2.5 4.5 2.5 JARAK PATOK (m) 2.5 4.5 2.5
CROSS SECTION V = 1 : 100
JALAN TRANS KOTAPULU H = 1 : 100
+25.86

+26.02

+26.16

+26.12

+26.08

+26.11

+26.12

+26.16
ELEVASI (m) ELEVASI (m)

CROSS SECTION TITIK P10 CROSS SECTION TITIK P11


Skala 1:100 Skala 1:100
NO. LEMBAR : JML. LEMBAR :

03 03
DETAIL DRAINASE DAN BOX CULVERT
DESA KOTAPULU & KOTARINDAU
PEMERINTAH DAERAH
KABUPATEN SIGI
DINAS PEKERJAAN UMUM DAN PERUMAHAN

KEGIATAN :

60 PEKERJAAN :

PENYUSUNAN MASTER PLAN DAN


DED DRAINASE KEC. MARAWOLA

LOKASI :

DESA SIBEDI

KETERANGAN :

60

TABEL PEMBESIAN DRAINASE TYPE 50.60


GAMBAR PANJANG TYPE TUL.
MENYETUJUI :

PEJABAT PELAKSANA TEKNIS KEGIATAN

20 a a = 64 cm ( PPTK )

b = 60 cm
66
b

a = 30 cm
........................................
a NIP. ......................
66
TIM TEKNIS TTD
12

a a = 68 cm
8
2

L-Saluran a. Badan= 13 buah


b. Penutup= 5 buah
8 50 8 KONSULTAN PERENCANA :
Gagang = 50 cm

DIRENCANA : DIGAMBAR :
50
BETON K250

NAMA GAMBAR SKALA GAMBAR

10 30
Typikal U-Ditch 50 x 60 1 : 15
8

TYPIKAL DRAINASE U-DITCH 50 x 60


Skala 1:15 NO. LEMBAR : JML. LEMBAR :

01 05
PEMERINTAH DAERAH
KABUPATEN SIGI
DINAS PEKERJAAN UMUM DAN PERUMAHAN

KEGIATAN :

60
PEKERJAAN :

PENYUSUNAN MASTER PLAN DAN


DED DRAINASE KEC. MARAWOLA

LOKASI :
120
DESA SIBEDI

KETERANGAN :

60

TABEL PEMBESIAN DRAINASE TYPE 80.100


GAMBAR PANJANG TYPE TUL.
MENYETUJUI :
20
100 a = 104 cm
PEJABAT PELAKSANA TEKNIS KEGIATAN
( PPTK )
a
b = 88 cm

100 b

12 a = 31 cm
........................................
a NIP. ......................

8 TIM TEKNIS TTD


2

a a = 102 cm
10 80 10
L-Saluran a. Badan= 23 buah
b. Penutup= 7 buah

KONSULTAN PERENCANA :
Gagang = 50 cm

DIRENCANA : DIGAMBAR :
84

NAMA GAMBAR SKALA GAMBAR

BETON K250
Typikal U-Ditch 80 x 100 1 : 15

16 48

10

NO. LEMBAR : JML. LEMBAR :

TYPIKAL DRAINASE U-DITCH 80 x 100


Skala 1:15
02 05
PEMERINTAH DAERAH
KABUPATEN SIGI
DINAS PEKERJAAN UMUM DAN PERUMAHAN

KEGIATAN :
60

PEKERJAAN :
120 PENYUSUNAN MASTER PLAN DAN
DED DRAINASE KEC. MARAWOLA

LOKASI :

60 DESA SIBEDI

KETERANGAN :

20
150
TABEL PEMBESIAN DRAINASE TYPE 120.160

GAMBAR PANJANG TYPE TUL.

a = 169 cm
a
MENYETUJUI :
b = 132 cm

PEJABAT PELAKSANA TEKNIS KEGIATAN


b ( PPTK )

150 a = 60 cm

12 a

10 ........................................
NIP. ......................
2
TIM TEKNIS TTD
a a = 162 cm

15 120 15
L-Saluran a. Badan= 32 buah
b. Penutup= 11 buah

Gagang = 55 cm

KONSULTAN PERENCANA :

136
DIRENCANA : DIGAMBAR :

NAMA GAMBAR SKALA GAMBAR

24 Typikal U-Ditch 120 x 160 1 : 20


BETON K250

24 72

15

NO. LEMBAR : JML. LEMBAR :


TYPIKAL DRAINASE U-DITCH 120 x 160
Skala 1:20

03 05
PEMERINTAH DAERAH
KABUPATEN SIGI
DINAS PEKERJAAN UMUM DAN PERUMAHAN
A Panjang Box Culvert
Aspal
KEGIATAN :

20

PEKERJAAN :

PENYUSUNAN MASTER PLAN DAN


DED DRAINASE KEC. MARAWOLA

LOKASI :

Panjang Box Culvert


DESA SIBEDI
190 150

KETERANGAN :
B B

Lantai Kerja (B0)


Pasir Urug

20

20 20
A MENYETUJUI :

5 10 PEJABAT PELAKSANA TEKNIS KEGIATAN


Denah Box Culvert 150x150 ( PPTK )
Skala 1:30
Potongan A - A
Skala 1:30

........................................
NIP. ......................

TIM TEKNIS TTD

20 150 20

TABEL PEMBESIAN BOX CULVERT TYPE 150.150 20 150 20

GAMBAR PANJANG TYPE TUL. 20 20

KONSULTAN PERENCANA :

a a = 15.00 cm
b
b = 185.00 cm

a
DIRENCANA : DIGAMBAR :
a = 15.00 cm
150 190 150 190
b b = 185.00 cm

NAMA GAMBAR SKALA GAMBAR


b
b = 57.73 cm
BETON K250
Denah Box Culvert 150x150 1 : 30
BOX CULVERT
Potongan A-A 1 : 30
a. Badan= 72 bh 20 20 Potongan B-B 1 : 30
5 5 Lantai Kerja (B0)
Detail Penulangan 1 : 30
5 5 Urugan Pasir Box Culvert 150x150
190 190

Potongan B - B
Skala 1:30
Detail Penulangan Box Culvert 150x150
Skala 1:30
NO. LEMBAR : JML. LEMBAR :

04 05
PEMERINTAH DAERAH
KABUPATEN SIGI
A DINAS PEKERJAAN UMUM DAN PERUMAHAN

Panjang Box Culvert


KEGIATAN :
Aspal

20
PEKERJAAN :

PENYUSUNAN MASTER PLAN DAN


DED DRAINASE KEC. MARAWOLA

LOKASI :

140 100
DESA SIBEDI

Panjang Box Culvert KETERANGAN :


Lantai Kerja (B0)
Pasir Urug

20

20 20
B B
6 10

Potongan A - A MENYETUJUI :
Skala 1:30
PEJABAT PELAKSANA TEKNIS KEGIATAN
( PPTK )

A
........................................
NIP. ......................
Denah Box Culvert 100x100 TIM TEKNIS TTD
Skala 1:30

20 100 20 KONSULTAN PERENCANA :

TABEL PEMBESIAN BOX CULVERT TYPE 100.100 20 100 20

GAMBAR PANJANG TYPE TUL. 20 20

DIRENCANA : DIGAMBAR :
a a = 15.00 cm
b
b = 135.00 cm

100 140 100 140


a

a = 15.00 cm NAMA GAMBAR SKALA GAMBAR

b b = 135.00 cm
BETON K250 Denah Box Culvert 100x100 1 : 30
Potongan A-A 1 : 30
20 20 Potongan B-B 1 : 30
5 5 Lantai Kerja (B0) Detail Penulangan 1 : 30
b
b = 55.37 cm 5 5 Urugan Pasir Box Culvert 100x100
140 140

BOX CULVERT

a. Badan= 56 bh Detail Penulangan Box Culvert 100x100 Potongan B - B


Skala 1:30 Skala 1:30

NO. LEMBAR : JML. LEMBAR :

05 05