DAFTAR HARGA SATUAN UPAH

PEKERJAAN : PEMBANGUNAN PRASANA AIR TANAH UNTUK AIR BAKU DI LIKUPANG


SUMBER DANA : APBN TAHUN 2020
LOKASI : LIKUPANG KABUPATEN MINAHASA UTARA
TAHUN ANGGARAN : 2020

HARGA SATUAN
NO JENIS UPAH SATUAN KET
(Rp)

1 Pekerja OH 97,200.00
2 Tukang Batu OH 108,000.00
3 Tukang Besi OH 108,000.00
4 Tukang Cat OH 108,000.00
5 Tukang Kayu OH 108,000.00
6 Kepala Tukang OH 126,000.00
7 Mandor OH 129,600.00
8 Penanggung jawab OH 135,129.60
9 Mekanik OH 111,628.80
10 Asisten Operator OH 99,878.40
11 Tenaga Terlatih OH 99,878.40
12 Operator Compresor OH 111,628.80
13 Tenaga ahli analisa air tanah OH 270,259.20
14 Geologist OH 270,259.20
15 Tool Pusher OH 135,129.60
16 Driller OH 111,628.80
17 Mekanik OH 111,628.80
18 Welder OH 111,628.80
19 Operator Pumping Test OH 111,628.80
20 Ass. Driller OH 99,878.40
21 Watchman OH 99,878.40
22 Helper OH 97,200.00
23 Penanggung jawab Pumping Test OH 135,129.60

Manado, 30 Juni 2020


CV. VIOLET

VONNY KALALO
Direktur
DAFTAR HARGA SATUAN BAHAN

PEKERJAAN : PEMBANGUNAN PRASANA AIR TANAH UNTUK AIR BAKU DI LIKUPANG


SUMBER DANA : APBN TAHUN 2020
LOKASI : LIKUPANG KABUPATEN MINAHASA UTARA
TAHUN ANGGARAN : 2020

HARGA SATUAN
NO JENIS BAHAN SATUAN KET
(Rp)
A Bahan Pasir, Batu, Semen dan Beton
I Pasir dan tanah
1 Pasir pasang m³ 177,840.00
2 Pasir beton / cor m³ 177,760.00
3 Pasir urug m³ 177,760.00
4 Tanah Timbunan m³ 60,000.00
5 Sirtu m³ 120,000.00
II Batu
1 Batu bata bh 760.00
2 Kerikil / koral beton m³ 100,000.00
3 Batu Pecah m³ 200,000.00
4 Batu gunung/kali m³ 140,000.00
5 Air ltr 400.00
5 Roester bh 144,000.00
III Semen
1 Semen PC 50 kg zak 56,000.00
2 Semen PC 1 kg kg 1,120.00
3 Beton Ready Mix K - 225 m³ 920,000.00

B Bahan Langit-langit
1 Triplek Lembar 36,000.00
2 Multipleks t = 9 mm Lembar 101,600.00
3 Gypsum 9 mm Lembar 52,800.00

C Bahan Besi dan Baja


1 Besi beton Kg 8,160.00
2 Bendrat / kawat beton Kg 16,000.00
3 Kawat las Kg 28,000.00
4 Alumunium Strep m' 13,920.00
5 Pintu Alumunium Lengkap Set 1,000,000.00
6 Besi Hollow 40.40.4 mm m' 67,200.00
7 Besi Hollow 40.20.2 mm m' 58,000.00
8 Pipa Besi Hitam 5/4" - 6m m' 40,000.00

D Pipa PVC, GIP dan Pipa HDPE Dan Assessoris


1 Pipa GIP dia. 4 ( Distribusi Utama ) m 138,750.00
2 Pipa GIP dia. 3 ( Transmisi dan Penguras ) m 97,500.00
3 Knee GIP dia. 4 bh 690,000.00
4 Knee GIP dia. 3 bh 618,375.00
5 Flange GIP dia. 4 bh 232,500.00
6 Flange PVC dia. 4 bh 182,250.00
7 Lem PVC bh 48,750.00
8 Baut (untuk penguat sambungan pipa sumur) bh 5,625.00
9 Pipa GIP dia. 3 ( Peluap ) m 97,500.00
10 Water Tank Frp 27 m3 (3x3x3) m3 373,611.11
11 Pipa HDPE SDR 17 90 mm PN 10 m 131,322.00
12 Pipa HDPE SDR 17 63 mm PN 10 m 51,858.00
13 Air Valve 2 inchi Bh 705,225.00
14 Reducer 4 - 3 Bh 123,600.00
15 Reducer 2 - 1,5 Bh 55,125.00
16 Reducer T - Join 4 - 2 Bh 1,002,225.00
17 T - Join 2 Bh 220,950.00
18 L - Join 2 Bh 213,690.00
19 T - Join 4 Bh 376,875.00
20 L - Join 4 Bh 393,375.00
21 Dop 4 Bh 268,140.00
22 Dop 2 Bh 222,600.00
23 Check Valve 4 unit 5,625,000.00
24 Mata Kran dan Assessoris unit 86,250.00
25 Pipa PVC. 4 S 12,5 M 126,375.00
26 L Joint 90 PVC 4 Buah 27,375.00
27 Elbow PVC 45 4 Buah 18,825.00
28 T Joint PVC 4 Buah 4,800.00
29 Reducer PVC 4-3 Buah 45,750.00
30 Stop Kran 3 Buah 213,750.00
31 Dop Besi 3 Buah 198,900.00
32 Flange PVC 3 Buah 40,950.00
33 Flange PVC 4 Buah 610,500.00
34 Flange Besi 4 Buah 114,000.00
35 Neple 4 Buah 24,000.00
36 Stop Kran 4 Buah 237,000.00
37 Baut Mur Buah 13,125.00
38 Packing Karet 3 Buah 131,250.00
39 Pipa Galvanis Medium A 4 m' 138,750.00
40 Water stop m' 78,750.00
41 Pipa PVC S-12,5 Dia. 4" m' 121,875.00
42 Pipa PVC S-10 Dia. 4" Dia. 8" m' 320,898.75

E Bahan Kayu dan penggantung


1 Kayu Klas III m3 1,600,000.00
2 Balok Klas III m3 1,600,000.00
3 Balok Kayu kls II m3 2,400,000.00
4 Dolken btg 17,200.00
5 Papan Kayu kls II m3 2,200,000.00
6 Minyak Bekisting ltr 2,400.00

F Bahan Paku
1 Paku Kayu 2" - 5" Kg 14,000.00
2 Paku klem /paku spandek Kg 200,000.00
3 Sekrup 1" kotak 20,000.00

G Bahan Finishing
1 Cat dasar (sealer) Kg 14,000.00
2 Cat tembok Ekterior Kg 70,000.00
3 Cat tembok Interior Kg 32,000.00
4 Minyak Bekisting Ltr 12,000.00
5 Cat meni Kg 36,000.00
6 Thiner Ltr 12,000.00
7 Kwas bh 20,000.00
H Bahan Pengeboran
1 Baut (untuk penguat sambungan pipa sumur) Buah 5,967.00
2 Grevel Pack m3 480,675.00
3 Tutup Sumur termasuk kunci Buah 1,560,000.00
4 Bottom Plug Buah 663,000.00
5 Centralizer 8" Buah 386,750.00
6 Tempat pengeringan sample Buah 44,200.00
7 Ayakan gravel Buah 165,750.00
8 Kawat ayakan m 49,725.00
9 Solar Liter 10,829.00
10 Olie Mesin Liter 59,670.00
11 Olie Hidrolik Liter 46,410.00
12 Olie Gardan Liter 60,775.00
13 Olie Transmisi Liter 60,775.00
14 Grease (vet) Kg 33,150.00
15 Pengadaan Bentonite Kg 19,500.00
16 Pengadaan Biopolimer (Mud Additive) Kg 68,250.00
17 Pengadaan Bahan Pembersih Kg 42,250.00
18 Kawat Kasa Sampel Paket 9,750.00
19 Kotak Sampel Paket 19,500.00
20 Kantong Plastik Paket 97.50
21 Bahan Uji Kualitas Air (1 Jerigen 1 Ltr, 2 Buah Botol 250 mL) Set 16,250.00
22 Resin Tube 120,250.00
23 Galon sample air Buah 63,700.00

H Bahan Pembangkit Listrik Tenaga Surya


1 Pompa Submersible Pump All Stainless stell Lengkap dengan CTK Kap. 2 Ltr/det dan Ass. Unit 39,900,000.00
2 Solar Modul 270 WP Lengkap Dengan Ass. Pcs 1,848,000.00
3 Kabel Array ke Kontrol Box dan kelengkapan Set 840,000.00
4 Kabel intermodule Array dan kelengkapannya Set 840,000.00
5 combine junction box Set 2,625,000.00
6 Solar Inverter Minimum 66 AC_DC Min. 3000 W Set 7,749,000.00
7 Sensor Dry Running Set 525,000.00
8 Sine Wive 200-500 8A IP20 Set 5,250,000.00
9 Support Modul Solar Set 9,450,000.00
10 TMLB Submersible Motor Cable m' 28,875.00
11 Cable 2C x 1,5 mm2 m' 68,250.00
12 Not Return Valve, Issolation Valve & Pressure Gauge Set 5,250,000.00

Manado, 30 Juni 2020


CV. VIOLET

VONNY KALALO
Direktur
DAFTAR HARGA SATUAN ALAT
PEKERJAAN : PEMBANGUNAN PRASANA AIR TANAH UNTUK AIR BAKU DI LIKUPANG
SUMBER DANA : APBN TAHUN 2020
LOKASI : LIKUPANG KABUPATEN MINAHASA UTARA
TAHUN ANGGARAN : 2020

HARGA SATUAN
NO JENIS ALAT SATUAN KET
(Rp)

1 Alat Sambung Pipa HDPE (Butt Fusion) Hari 250,000.00


2 Drilling Rig Hari 350,000.00
3 Mud Pump Double Piston Hari 350,000.00
4 Compressor Jam 40,000.00
5 Generator Set Hari 249,600.00
6 Tripot / Tackel dan Handle Crane 2T Hari 400,000.00
7 Alat Bantu Ls 5,000.00
8 Alat Logging Geofisik Ls 140,000.00
9 Peralatan Sampling Kualitas Air Hari 40,000.00
10 Peralatan Uji Parameter Lapangan Hari 75,000.00
11 Alat Geo Listrik Hari 60,000.00

Manado, 30 Juni 2020


CV. VIOLET

VONNY KALALO
Direktur