REKAPITULASI

RENCANA ANGGARAN BIAYA


(Engineer Estimate)

KEGIATAN : PENGEMBANGAN SISTEM DISTRIBUSI AIR MINUM (DAK)


PEKERJAAN : PEMBANGUNAN SARANA DAN PRASARANA AIR BERSIH
LOKASI : DESA KARANGGAYAM KECAMATAN OMBEN
HPS : Rp 250,000,000.00
TAHUN : 2018

JUMLAH
NO PEKERJAAN HARGA
(Rp)

I PEKERJAAN PERSIAPAN 7,200,527.10


II PEKERJAAN TANAH DAN PONDASI 9,946,309.71
III PEKERJAAN STRUKTUR BETON 90,551,731.06
IV PEKERJAAN RUMAH PANEL DAN TANGGA BESI 13,642,310.99
V PEKERJAAN KUSEN, PINTU DAN JENDELA 4,243,682.48
VI PEKERJAAN INSTALASI TANDON( INLET + OUTLET )TANDON 5,876,177.60
VII PEKERJAAN BAK KONTROL 1,454,917.98
VIII PEKERJAAN INSTALASI LISTRIK 9,175,307.88
IX PEKERJAAN SUMUR DAN POMPA 22,456,800.00
X PEKERJAAN BOX POMPA 1,901,290.05
XI PEMASANGAN PIPA Ø 2" RRJ S 12.5 L: 45 m' 3,920,325.10
XII PEMASANGAN PIPA PVC AW Ø 1" L: 923 m' 36,716,656.80
XIII PIPA DISTRIBUSI + SAMBUNGAN RUMAH (35 SR) 12,139,418.18

JUMLAH Rp 219,225,454.93
PPN 10% Rp 21,922,545.49
TOTAL Rp 241,148,000.43
DIBULATKAN Rp 241,100,000.00
Ratus
Terbilang : Dua Ratus Empat Puluh Satu Juta Sembilan Puluh Sembilan Ribu Sembilan Ratus Sembilan Puluh SembilanRupiah0sen Ribu
Juta
Puluh

Belas
Diketahui Oleh: Sampang, 2017
PEJABAT PELAKSANA TEKNIS KEGIATAN (PPTK) Konsultan Perencana ###
PT. TATA CIPTA UTAMA ###

###
###
###
AGUS EKO KURNIAWAN,ST,Msi. SUHADI,ST
NIP : 19750809 200604 1 023 Direktur

0
Mengetahui/Menyetujui : 1
KEPALA BIDANG AIR MINUM DAN PENYEHATAN LINGKUNGAN
4
SELAKU PEJABAT PEMBUAT KOMITMEN (PPK) 2

SITI MUATHIFAH,ST. MT
NIP : 197550824 200604 2 019
RENCANA ANGGARAN BIAYA
(Engineer Estimate)

KEGIATAN : PENGEMBANGAN SISTEM DISTRIBUSI AIR MINUM (DAK)


PEKERJAAN : PEMBANGUNAN SARANA DAN PRASARANA AIR BERSIH
LOKASI : DESA KARANGGAYAM KECAMATAN OMBEN
HPS : Rp 250,000,000.00
TAHUN : 2018
REALISAI PEKERJAAN KURANG PEKERJAAN TAMBAH
HARGA HARGA HARGA
NO URAIAN PEKERJAAN VOLUME SAT. SATUAN JUMLAH VOLUME SATUAN JUMLAH VOLUME SATUAN
(Rp) (Rp) (Rp) (Rp) (Rp)
I PEKERJAAN PERSIAPAN
A Pembersihan Lokasi 36.00 m2 4,851.00 174,636.00 - 0 - 0
B Papan nama proyek 1.00 ls 300,000.00 300,000.00 - 0 - 0
C Pemasangan Bowplank 16.00 m' 141,993.83 2,271,901.28 - 0 - 0
D Pengujian Tanah di lapangan (Sondir) 1.00 Titik - 1.00 3,800,000.00 3,800,000.00 - 0
SUB JUMLAH I 2,746,537.28 3,800,000.00
II PEKERJAAN TANAH DAN PONDASI
A Pekerjaan Galian Tanah 14.64 m³ 45,518.55 666,391.57 - - - -
B Pekerjaan Bor Pondasi strauss Dia. 30 cm H: 3 m' 36.00 m' 78,356.40 2,820,830.40 - - - -
C Pekerjaan Urugan Tanah Kembali 9.02 m³ 26,680.50 240,551.39 - - - -
D Pekerjaan Urug Sirtu 1.96 m³ 153,597.84 301,051.77 - - - -
E Pekerjaan Pasangan Batu Gunung 1pc : 4ps 5.71 m³ 830,727.92 4,745,117.88 0.72 830,727.92 598,124.10 - -
SUB JUMLAH II 8,773,943.01 598,124.10
III PEKERJAAN STRUKTUR BETON
A Pekerjaan Beton, mutu f'c=19,3 Mpa (K225)
Pekerjaan Beton Pondasi, mutu f'c=19,3 Mpa (K225)
- Strauss dia. 30 cm,P=3m @4 2.54 m³ 941,065.28 2,393,505.43 - - - - -
- Footplat uk.1.2X1.2X0.3 1.73 m³ 941,065.28 1,626,160.80 - - - - -
- Poer 30x30 0.31 m³ 941,065.28 287,965.98 - - - - -
Pekerjaan Beton Sloof, mutu f'c=19,3 Mpa (K225) - -
- Sloof 15x20 0.08 m³ 941,065.28 76,226.29 0.01 941,065.28 8,469.59 - -
- Sloof 20x35 0.67 m³ 941,065.28 632,395.87 0.08 941,065.28 79,049.48 - -
Pekerjaan Beton Kolom, mutu f'c=19,3 Mpa (K225) - -
- Kolom 30X30 (K1) 3.24 m³ 941,065.28 3,049,051.51 - - - - -
- Kolom 20X20 (K2) 0.43 m³ 941,065.28 406,540.20 - - - - -
Pekerjaan Beton Balok, mutu f'c=19,3 Mpa (K225) - - -
- Balok 15x20 (RB) 0.16 m³ 941,065.28 146,806.18 0.01 941,065.28 11,292.78 - -
- Balok 20x35 (BA1) 0.36 m³ 941,065.28 342,547.76 0.03 941,065.28 26,349.83 - -
- Balok 20x25 (BA2) 0.26 m³ 941,065.28 244,676.97 0.02 941,065.28 18,821.31 - -
- Balok 20x35 (B1) 0.67 m³ 941,065.28 632,395.87 0.08 941,065.28 79,049.48 - -
- Balok 20x40 (B2) 0.77 m³ 941,065.28 722,738.14 0.10 941,065.28 90,342.27 - -
- Balok 20x30 (B3) 0.58 m³ 941,065.28 542,053.60 0.07 941,065.28 67,756.70 - -
Pekerjaan Beton Plat Lantai, mutu f'c=19,3 Mpa (K225) - -

2 of 84
HARGA HARGA HARGA
NO URAIAN PEKERJAAN VOLUME SAT. SATUAN JUMLAH VOLUME SATUAN JUMLAH VOLUME SATUAN
(Rp) (Rp) (Rp) (Rp) (Rp)
- Plat Lantai t=12 cm 0.87 m³ 941,065.28 823,243.91 0.21 941,065.28 193,106.60 - -
- Plat Tutup Tandon t= 7 cm 0.51 m³ 941,065.28 480,225.61 0.12 941,065.28 112,645.51 - -
- Plat Rumah Panel t= 7 cm 0.51 m³ 941,065.28 480,225.61 0.12 941,065.28 112,645.51 - -
Pekerjaan Beton Dinding Tandon ,mutu f'c=19,3 Mpa (K225) - - - - -
- Dinding Tandon t = 12 3.37 m³ 941,065.28 3,171,013.57 0.39 941,065.28 365,886.18 - -
B Pekerjaan Pembesian - - - - -
Pondasi - - - - -
- Strauss dia. 30 cm,P=3m @4 353.85 kg 10,605.65 3,752,777.29 - - - - -
- Footplat uk.1.2X1.2X0.3 181.81 kg 10,605.65 1,928,247.67 - - - - -
- Poer 30x30 58.87 kg 10,605.65 624,337.14 - - - - -
Sloof - - - - -
- Pekerjaan Sloof 15x20 15.98 kg 10,605.65 169,474.89 1.78 10,605.65 18,830.54 - -
- Pekerjaan Sloof 20x35 20.99 kg 10,605.65 222,618.87 2.62 10,605.65 27,827.36 - -
Kolom - - - - -
- Kolom 30X30 (K1) 615.51 kg 10,605.65 6,527,921.81 - - - - -
- Kolom 20X20 (K2) 105.11 kg 10,605.65 1,114,768.19 - - - - -
Balok
- Balok 15x20 (RB) 30.54 kg 10,605.65 323,885.35 2.84 10,605.65 30,128.87 - -
- Balok 20x35 (BA1) 80.41 kg 10,605.65 852,814.40 6.79 10,605.65 71,974.52 - -
- Balok 20x25 (BA2) 55.79 kg 10,605.65 591,697.53 4.89 10,605.65 51,888.61 - -
- Balok 20x35 (B1) 123.73 kg 10,605.65 1,312,279.67 15.47 10,605.65 164,034.96 - -
- Balok 20x40 (B2) 186.86 kg 10,605.65 1,981,810.11 23.36 10,605.65 247,726.26 - -
- Balok 20x30 (B3) 181.81 kg 10,605.65 1,928,247.67 22.73 10,605.65 241,030.96 - -
Plat Lantai
- Plat Lantai t=12 cm 273.25 kg 10,605.65 2,898,020.67 46.34 10,605.65 491,477.19 - -
- Plat Tutup Tandon t= 7 cm 273.25 kg 10,605.65 2,898,020.67 46.34 10,605.65 491,477.19 - -
- Plat Rumah Panel t= 7 cm 273.25 kg 10,605.65 2,898,020.67 46.34 10,605.65 491,477.19 - -
Dinding Tandon - - - - - -
- Dinding Tandon t = 12 263.13 kg 10,605.65 2,790,686.57 30.36 10,605.65 322,002.30 - -
C Pekerjaan Bekisting
Kolom
- Poer 30x30 4.08 m2 78,607.58 320,718.93 - - - - -
- Kolom 30X30 (K1) 43.20 m2 78,607.58 3,395,847.46 - - - - -
- Kolom 20X20 (K2) 8.64 m2 78,607.58 679,169.49 - - - - -
Sloof - - - - -
- Pekerjaan Sloof 15x20 7.56 m2 82,066.40 620,421.98 0.84 82,066.40 68,935.78 - -
- Pekerjaan Sloof 20x35 10.56 m2 82,066.40 866,621.18 1.32 82,066.40 108,327.65 - -
Balok - - - - - -
- Balok 15x20 (RB) 3.92 m2 76,975.13 301,742.51 - - - - -
- Balok 20x35 (BA1) 5.72 m2 76,975.13 440,297.74 0.44 76,975.13 33,869.06 - -
- Balok 20x25 (BA2) 4.68 m2 76,975.13 360,243.61 0.36 76,975.13 27,711.05 - -
- Balok 20x35 (B1) 10.56 m2 76,975.13 812,857.37 1.32 76,975.13 101,607.17 - -
- Balok 20x40 (B2) 11.52 m2 76,975.13 886,753.50 1.44 76,975.13 110,844.19 - -
- Balok 20x30 (B3) 9.60 m2 76,975.13 738,961.25 1.20 76,975.13 92,370.16 - -

3 of 84
HARGA HARGA HARGA
NO URAIAN PEKERJAAN VOLUME SAT. SATUAN JUMLAH VOLUME SATUAN JUMLAH VOLUME SATUAN
(Rp) (Rp) (Rp) (Rp) (Rp)
Plat Lantai - - - - -
- Plat Lantai t=12 cm 1.30 m2 72,036.13 93,358.82 0.14 72,036.13 10,373.20 - -
- Plat Tutup Tandon t= 7 cm 0.76 m2 72,036.13 54,459.31 0.08 72,036.13 6,051.03 - -
- Plat Rumah Panel t= 7 cm 0.76 m2 72,036.13 54,459.31 0.08 72,036.13 6,051.03 - -
Dinding Tandon - - - - -
- Dinding Tandon t = 12 28.08 m2 77,283.13 2,170,110.29 3.24 77,283.13 250,397.34 - -
D Pekerjaan Perancah - - - - -
Kolom - - - - -
- Poer 30x30 4.08 76,703.00 312,948.24 - - - - -
- Kolom 30X30 (K1) 43.20 m2 76,703.00 3,313,569.60 - - - - -
- Kolom 20X20 (K2) 8.64 m2 76,703.00 662,713.92 - - - - -
Balok - - - - - -
- Balok 15x20 (RB) 3.92 m2 80,932.50 317,255.40 - - - - -
- Balok 20x35 (BA1) 5.72 m2 80,932.50 462,933.90 0.44 80,932.50 35,610.30 - -
- Balok 20x25 (BA2) 4.68 m2 80,932.50 378,764.10 0.36 80,932.50 29,135.70 - -
- Balok 20x35 (B1) 10.56 m2 80,932.50 854,647.20 1.32 80,932.50 106,830.90 - -
- Balok 20x40 (B2) 11.52 m2 80,932.50 932,342.40 1.44 80,932.50 116,542.80 - -
- Balok 20x30 (B3) 9.60 m2 80,932.50 776,952.00 1.20 80,932.50 97,119.00 - -
Plat Lantai - - - - - -
- Plat Lantai t=12 cm 1.30 m2 85,272.00 110,512.51 0.14 85,272.00 12,279.17 - -
- Plat Tutup Tandon t= 7 cm 0.76 m2 85,272.00 64,465.63 0.08 85,272.00 7,162.85 - -
- Plat Rumah Panel t= 7 cm 0.76 m2 85,272.00 64,465.63 0.08 85,272.00 7,162.85 - -
Dinding Tandon - - - - -
- Dinding Tandon t = 12 28.08 m2 48,290.00 1,355,983.20 3.24 48,290.00 156,459.60 - -
E Pekerjaan Rabat Lantai Beton t = 7 cm Fc. = 7.4 Mpa (K100 ) 0.49 m³ 800,178.50 392,087.47 0.06 800,178.50 47,050.50 - -
F Pekerjaan Pasang Waterstop PVC Tandon 12.00 m' 96,432.05 1,157,184.60 - - - - -
G Pekerjaan Cat water profing tandon 36.18 m2 82,524.75 2,985,745.46 4.14 82,524.75 341,652.47 - -
SUB JUMLAH III 74,811,996.51 5,588,834.98
IV PEKERJAAN RUMAH PANEL DAN TANGGA BESI - -
A Pekerjaan Pasangan Batu Bata 20.40 m2 110,658.13 2,256,872.56 1.59 110,658.13 175,946.43 - -
B Pekerjaan Kolom Praktis 5.30 m' 65,584.20 347,596.26 - - - - -
C Pekerjaan Pleteran 40.79 m2 47,847.43 1,951,696.67 3.18 47,847.43 152,154.83 - -
D Pekerjaan Acian 40.79 m2 48,141.98 1,963,711.36 3.18 48,141.98 153,091.50 - -
E Pekerjaan Pengecatan Total Tandon 162.59 m2 20,333.80 3,306,072.54 3.18 20,333.80 64,661.48 - -
F Pekerjaan Tangga besi siku 40x40x2 + erection 65.34 kg 24,452.93 1,597,754.45 - - - - -
G Pekerjaan Pengecatan besi Tangga 4.54 m2 26,268.19 119,152.51 - - - - -
SUB JUMLAH IV 11,542,856.35 545,854.23
V PEKERJAAN KUSEN, PINTU DAN JENDELA - - - - -
A Pek. Pas. Kusen Pintu + Daun Pintu ( Kayu Meranti ) 1.00 set 2,985,511.93 2,985,511.93 - - - - -
B Pek. Pas. Bouvenli+jeruji besi dia 16 mm 1.00 set 308,871.86 308,871.86 - - - - -
C Pek. Pas. Glabox 0.48 m2 572,230.12 274,670.46 - - - - -
SUB JUMLAH V 3,569,054.25 -

4 of 84
HARGA HARGA HARGA
NO URAIAN PEKERJAAN VOLUME SAT. SATUAN JUMLAH VOLUME SATUAN JUMLAH VOLUME SATUAN
(Rp) (Rp) (Rp) (Rp) (Rp)
VI PEKERJAAN INSTALASI TANDON( INLET + OUTLET )TANDON - - - - -
A Pipa GIP ∅ 1" (PIPA INLET) 10.00 m' 154,434.50 1,544,345.00 - - - - -
B Pipa GIP ∅ 2" (PIPA OUTLET) 7.00 m' 154,434.50 1,081,041.50 - - - - -
C Pipa GIP ∅ 1" (pembuangan) 7.00 m' 94,726.50 663,085.50 - - - - -
D Pipa GIP ∅ 1" (peluap) 3.00 m' 94,726.50 284,179.50 - - - - -
E Gate Valve ∅ 1" 2.00 bh 362,767.50 725,535.00 - - - - -
F Flange Las ∅ 2" 5.00 bh 54,243.20 271,216.00 - - - - -
G Flange Las ∅ 1" 14.00 bh 54,243.20 759,404.80 - - - - -
H Flange Spigot ∅ 2" 1.00 bh 115,000.00 115,000.00 - - - - -
I Flange Socket ∅ 1" 1.00 bh 69,000.00 69,000.00 - - - - -
J Bend All Flange 90° GIP dia. 2" 1.00 bh 212,722.40 212,722.40 - - - - -
K Bend All Flange 90° GIP dia. 1" 2.00 bh 59,800.00 119,600.00 - - - - -
L Tee All Flange GIP dia. 1" 1.00 bh 253,910.80 253,910.80 - - - - -
SUB JUMLAH VI 5,845,129.70 -
VII PEKERJAAN BAK KONTROL - - - - -
A Galian Tanah 0.35 m3 45,518.55 15,931.49 - - - - -
B Pas. Bata putih 2.00 m2 110,658.13 221,316.26 - - - - -
C Plester 4.00 m2 47,487.43 189,949.72 - - - - -
D Acian 4.00 m2 48,141.98 192,567.92 - - - - -
E Tutup plat 0.74 m2 864,106.54 639,093.20 - - - - -
SUB JUMLAH VII 1,258,858.59 -
VIII PEKERJAAN INSTALASI LISTRIK - - - - -
A Pek. Pas. LVMDP - - - - - -
- Box Panel 40x60x25 1.00 unit 352,314.00 352,314.00 - - - - -
- MCB 10A / 1P 1.00 unit 32,264.40 32,264.40 - - - - -
- MCB 10A / 3P 1.00 unit 177,744.00 177,744.00 - - - - -
- Kontaktor 3 Phase/12A 1.00 bh 153,088.00 153,088.00 - - - - -
B Pek. Pas. Instalasi titik lampu 2.00 ttk 165,246.41 330,492.82 - - - - -
C Pek. Pas. Instalasi saklar ganda 1.00 ttk 192,629.80 192,629.80 - - - - -
D Pek. Pas. Instalasi stop kontak 1.00 ttk 72,932.51 72,932.51 - - - - -
E Pek. Pas. Lampu SL 18 Watt 2.00 bh 57,315.50 114,631.00 - - - - -
F Pek. Penyambungan daya baru (PLN) 2200 VA 1.00 Is 5,428,000.00 5,428,000.00 - - - - -
G Pek. Kabel twisted 2 x 16 mm2 25.00 m' 5,336.00 133,400.00 - - - - -
H Pek. Kabel power pompa NYY 4 x 4 mm2 55.00 m' 23,920.00 1,315,600.00 - - - - -
SUB JUMLAH VIII 8,303,096.53 -
IX PEKERJAAN SUMUR DAN POMPA - - - - -
A Uji Pemompaan Sumur (Pumping Test) Introduction, Step, Long, Recovery 48.00 Jam 139,738.50 6,707,448.00 - - - - -
B Pasang Pompa Jet Pump (0,5 - 1 L/s,H suc =20 m, H discharge = 18 m,Daya = 817 w) 1.00 unit 8,700,000.00 8,700,000.00 - - - - -
C Pek. Pas. Pipa GIP.1" (inlet sumur+aksesories) 28.00 m 94,726.50 2,652,342.00 - - - - -
D Water Level Control Omron 61F @tangki 1.00 set 581,900.00 581,900.00 - - - - -
E Pasang manometer 1.00 unit 207,000.00 207,000.00 - - - - -
F Pasang Air Valve 1.00 unit 280,600.00 280,600.00 - - - - -
G Pasang Check Valve ∅ 2" 1.00 unit 806,150.00 806,150.00 - - - - -
H Pasang Gate Valve ∅ 2" 1.00 unit 362,767.50 362,767.50 - - - - -
I Pek. Pas. Flange socket ∅ 2" 2.00 unit 149,500.00 299,000.00 - - - - -
J Pek. Pas. Flange Las ∅ 2" 2.00 bh 86,021.32 172,042.64 - - - - -
SUB JUMLAH IX 20,769,250.14 -

5 of 84
HARGA HARGA HARGA
NO URAIAN PEKERJAAN VOLUME SAT. SATUAN JUMLAH VOLUME SATUAN JUMLAH VOLUME SATUAN
(Rp) (Rp) (Rp) (Rp) (Rp)
X PEKERJAAN BOX POMPA - - - - -
A Galian Tanah 0.47 m3 45,518.55 21,302.68 - - - - -
B Pas. Bata putih 5.44 m2 110,658.13 601,980.23 - - - - -
C Plester 2.88 m2 47,487.43 136,763.80 - - - - -
D Acian 2.88 m2 48,141.98 138,648.90 - - - - -
E Tutup plat 0.88 m2 864,106.54 761,796.33 - - - - -
SUB JUMLAH X 1,660,491.94 -
XI PEMASANGAN PIPA Ø 2" RRJ S 12.5 L: 45 m' - - - - -
A Pekerjaan Galian Tanah 2.52 m³ 45,518.55 114,706.75 - - - - -
B Pekerjaan Urugan Tanah Kembali 2.39 m³ 26,680.50 63,743.50 - - - - -
C Pekerjaan Pembuangan tanah 0.13 m³ 32,145.85 4,206.54 - - - - -
D Pekerjaan Pengadaan & Pemasangan Pipa - - - - -
- Pipa PVC AW Ø 2" RRJ S 12.5 210.00 m' 39,792.50 8,356,425.00 - - 165.00 39,792.50
E Pekerjaan Pencucian Pipa - - - - -
- Pipa PVC AW Ø 2" RRJ S 12.5 210.00 m' 504.62 105,970.20 - - 165.00 504.62
F Pekerjaan Pengetesan Pipa - - - -
- Pipa PVC AW Ø 2" RRJ S 12.5 210.00 m' 1,207.26 253,524.60 - - 165.00 1,207.26
G Pekerjaan Bor Jacking Pipa - - - - -
- Pek. Jacking Pipa Ø 3" + Selubung Pipa GIP Ø 3" 3.00 m' 282,040.00 846,120.00 - - - - -
H Aksesories dan pemasangannya - - - - -
- Tee All Socked PVC ( RR ) Ø 63mm x Ø 63mm 1.00 bh 127,052.00 127,052.00 - - - - -
- Reducer PVC RR Φ 2" - 1" 2.00 bh 153,640.00 307,280.00 - - - - -
- Bend Double Socket RR 90˚x Ø 63mm 1.00 bh 118,128.00 118,128.00 - - - - -
SUB JUMLAH XI 10,297,156.59 -
XII PEMASANGAN PIPA PVC AW Ø 1" L: 923 m' - - - - -
A Pekerjaan Galian Tanah 55.02 m³ 45,518.55 2,504,430.62 - - - - -
B Pekerjaan Urugan Tanah Kembali 52.16 m³ 26,680.00 1,391,707.11 - - - - -
C Pekerjaan Pembuangan tanah 2.86 m³ 32,145.85 91,842.78 - - - - -
D Pekerjaan Pengadaan & Pemasangan Pipa - - - - -
- Pipa PVC AW Ø 1" 923.00 m' 27,169.78 25,077,706.94 - - - - -
E Pekerjaan Pencucian Pipa - - - - -
- Pipa PVC AW Ø 1" 923.00 m' 504.63 465,773.49 - - - - -
F Pekerjaan Pengetesan Pipa - - - - -
- Pipa PVC AW Ø 1" 923.00 m' 1,207.26 1,114,300.98 - - - - -
G Pekerjaan Bor Jacking Pipa - - - - -
- Pek. Jacking Pipa Ø 2" + Selubung Pipa GIP Ø 2" 6.00 m' 233,344.00 1,400,064.00 - - - - -
H Aksesories dan pemasangannya - - - - -
- End Cup PVC Φ 1" 4.00 bh 4,784.00 19,136.00 - - - - -
- Tee all socket PVC Ø 1" 2.00 bh 5,244.00 10,488.00 - - - - -
SUB JUMLAH XII 32,075,449.92 -

6 of 84
HARGA HARGA HARGA
NO URAIAN PEKERJAAN VOLUME SAT. SATUAN JUMLAH VOLUME SATUAN JUMLAH VOLUME SATUAN
(Rp) (Rp) (Rp) (Rp) (Rp)
XIII PIPA DISTRIBUSI + SAMBUNGAN RUMAH (35 SR)
A Pekerjaan Galian Tanah 12.60 m³ 45,518.55 573,533.73 - - - - -
B Pekerjaan Urugan Tanah Kembali 12.57 m³ 26,680.50 335,487.07 - - - - -
C Pekerjaan Pembuangan tanah 0.03 m³ 22,145.85 570.43 - - - - -
D Pekerjaan Pengadaan & Pemasangan Pipa - - - - -
- Pipa PVC AW Ø 1/2" (Sambungan Rumah) 210.00 m' 17,287.60 3,630,396.00 - - - - -
E Pekerjaan Pencucian Pipa - - - - -
- Pipa PVC AW Ø 1/2" (Sambungan Rumah) 210.00 m' 504.62 105,970.20 - - - - -
F Pekerjaan Pengetesan Pipa - - - - -
- Pipa PVC AW Ø 1/2" (Sambungan Rumah) 210.00 m' 1,207.26 253,524.60 - - - - -
G Aksesories dan pemasangannya - - - - -
- Clamp Sadle PVC (2" - 1/2") 35.00 bh 28,520.00 998,200.00 - - - - -
- Kran air dia. 1/2" 35.00 bh 32,200.00 1,127,000.00 - - - - -
- Meteran air dia. 1/2" 35.00 bh 106,563.60 3,729,726.00 - - - - -

XIV PEKERJAAN PLENGSENGAN H=1.6, P=5m


- Pekerjaan Galian Tanah 1.64 m3 45,518.55 74,526.61 - 1.64 45,518.55
- Pekerjaan Pasangan Batu Gunung 4.55 m3 830,727.92 3,778,150.58 - 4.55 830,727.92
- Pekerjaan Plesteran 0.36 m2 47,487.43 17,277.83 - 0.36 47,487.43
- Pekerjaan Acian 0.36 m2 48,141.98 17,515.98 - 0.36 48,141.98
SUB JUMLAH 14,641,879.02 -
JUMLAH Rp 196,295,699.82 10,532,813.31
PPN 10% Rp 19,629,569.98 1,053,281.33
JUMLAH TOTAL Rp 215,925,269.81 11,586,094.65
DIBULATKAN Rp 215,925,000.00 Rp 11,586,000.00
Selisih

7 of 84
PEKERJAAN TAMBAH
HARGA
JUMLAH
(Rp)

-
-

-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-

8 of 84
HARGA
JUMLAH
(Rp)
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-

-
-
-
-
-
-

-
-
-
-
-

-
-
-
-
-
-
-
-
-
-
-
-
-

9 of 84
HARGA
JUMLAH
(Rp)
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-

10 of 84
HARGA
JUMLAH
(Rp)
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-

11 of 84
HARGA
JUMLAH
(Rp)
-
-
-
-
-
-
-
-
-
-
-
-
6,565,762.50
-
83,262.30
-
199,197.90
-
-
-
-
-
-
6,848,222.70
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-

12 of 84
HARGA
JUMLAH
(Rp)

-
-
-
-
-
-
-
-
-
-
-
-
-

74,526.61
3,778,150.58
17,277.83
17,515.98
3,887,471.00
10,735,693.70
Rp 1,073,569.37
11,809,263.07
Rp 11,809,000.00
Rp 223,000.00

13 of 84
RENCANA ANGGARAN BIAYA
(Engineer Estimate)

KEGIATAN : PENGEMBANGAN SISTEM DISTRIBUSI AIR MINUM (DAK)


PEKERJAAN : PEMBANGUNAN SARANA DAN PRASARANA AIR BERSIH
LOKASI : DESA KARANGGAYAM KECAMATAN OMBEN
HPS : Rp 250,000,000.00
TAHUN : 2018

HARGA
NO URAIAN PEKERJAAN VOLUME SAT. SATUAN JUMLAH
(Rp) (Rp)
I PEKERJAAN PERSIAPAN
A Pembersihan Lokasi 36.00 m2 4,851.00 174,636.00
B Papan nama proyek 1.00 ls 300,000.00 300,000.00
C Pemasangan Bowplank 16.00 m' 141,993.83 2,271,901.28
D Pengujian Tanah di lapangan (Sondir) 1.00 Titik -
SUB JUMLAH I 2,746,537.28
II PEKERJAAN TANAH DAN PONDASI
A Pekerjaan Galian Tanah 14.64 m³ 45,518.55 666,391.57
B Pekerjaan Bor Pondasi strauss Dia. 30 cm H: 3 m' 36.00 m' 78,356.40 2,820,830.40
C Pekerjaan Urugan Tanah Kembali 9.02 m³ 26,680.50 240,551.39
D Pekerjaan Urug Sirtu 1.96 m³ 153,597.84 301,051.77
E Pekerjaan Pasangan Batu Gunung 1pc : 4ps 5.71 m³ 830,727.92 4,745,117.88
SUB JUMLAH II 8,773,943.01
III PEKERJAAN STRUKTUR BETON
A Pekerjaan Beton, mutu f'c=19,3 Mpa (K225)
Pekerjaan Beton Pondasi, mutu f'c=19,3 Mpa (K225)
- Strauss dia. 30 cm,P=3m @4 2.54 m³ 941,065.28 2,393,505.43
- Footplat uk.1.2X1.2X0.3 1.73 m³ 941,065.28 1,626,160.80
- Poer 30x30 0.31 m³ 941,065.28 287,965.98
Pekerjaan Beton Sloof, mutu f'c=19,3 Mpa (K225)
- Sloof 15x20 0.08 m³ 941,065.28 76,226.29
- Sloof 20x35 0.67 m³ 941,065.28 632,395.87
Pekerjaan Beton Kolom, mutu f'c=19,3 Mpa (K225)
- Kolom 30X30 (K1) 3.24 m³ 941,065.28 3,049,051.51
- Kolom 20X20 (K2) 0.43 m³ 941,065.28 406,540.20
Pekerjaan Beton Balok, mutu f'c=19,3 Mpa (K225) -
- Balok 15x20 (RB) 0.16 m³ 941,065.28 146,806.18
- Balok 20x35 (BA1) 0.36 m³ 941,065.28 342,547.76
- Balok 20x25 (BA2) 0.26 m³ 941,065.28 244,676.97
- Balok 20x35 (B1) 0.67 m³ 941,065.28 632,395.87
- Balok 20x40 (B2) 0.77 m³ 941,065.28 722,738.14
- Balok 20x30 (B3) 0.58 m³ 941,065.28 542,053.60
Pekerjaan Beton Plat Lantai, mutu f'c=19,3 Mpa (K225)
- Plat Lantai t=12 cm 0.87 m³ 941,065.28 823,243.91
- Plat Tutup Tandon t= 7 cm 0.51 m³ 941,065.28 480,225.61
- Plat Rumah Panel t= 7 cm 0.51 m³ 941,065.28 480,225.61
Pekerjaan Beton Dinding Tandon ,mutu f'c=19,3 Mpa (K225)
- Dinding Tandon t = 12 3.37 m³ 941,065.28 3,171,013.57
B Pekerjaan Pembesian
Pondasi
- Strauss dia. 30 cm,P=3m @4 353.85 kg 10,605.65 3,752,777.29
- Footplat uk.1.2X1.2X0.3 181.81 kg 10,605.65 1,928,247.67
- Poer 30x30 58.87 kg 10,605.65 624,337.14
Sloof
- Pekerjaan Sloof 15x20 15.98 kg 10,605.65 169,474.89
- Pekerjaan Sloof 20x35 20.99 kg 10,605.65 222,618.87
Kolom
- Kolom 30X30 (K1) 615.51 kg 10,605.65 6,527,921.81
- Kolom 20X20 (K2) 105.11 kg 10,605.65 1,114,768.19

14 of 84
HARGA
NO URAIAN PEKERJAAN VOLUME SAT. SATUAN JUMLAH
(Rp) (Rp)
Balok
- Balok 15x20 (RB) 30.54 kg 10,605.65 323,885.35
- Balok 20x35 (BA1) 80.41 kg 10,605.65 852,814.40
- Balok 20x25 (BA2) 55.79 kg 10,605.65 591,697.53
- Balok 20x35 (B1) 123.73 kg 10,605.65 1,312,279.67
- Balok 20x40 (B2) 186.86 kg 10,605.65 1,981,810.11
- Balok 20x30 (B3) 181.81 kg 10,605.65 1,928,247.67
Plat Lantai
- Plat Lantai t=12 cm 273.25 kg 10,605.65 2,898,020.67
- Plat Tutup Tandon t= 7 cm 273.25 kg 10,605.65 2,898,020.67
- Plat Rumah Panel t= 7 cm 273.25 kg 10,605.65 2,898,020.67
Dinding Tandon -
- Dinding Tandon t = 12 263.13 kg 10,605.65 2,790,686.57
C Pekerjaan Bekisting
Kolom
- Poer 30x30 4.08 m2 78,607.58 320,718.93
- Kolom 30X30 (K1) 43.20 m2 78,607.58 3,395,847.46
- Kolom 20X20 (K2) 8.64 m2 78,607.58 679,169.49
Sloof
- Pekerjaan Sloof 15x20 7.56 m2 82,066.40 620,421.98
- Pekerjaan Sloof 20x35 10.56 m2 82,066.40 866,621.18
Balok -
- Balok 15x20 (RB) 3.92 m2 76,975.13 301,742.51
- Balok 20x35 (BA1) 5.72 m2 76,975.13 440,297.74
- Balok 20x25 (BA2) 4.68 m2 76,975.13 360,243.61
- Balok 20x35 (B1) 10.56 m2 76,975.13 812,857.37
- Balok 20x40 (B2) 11.52 m2 76,975.13 886,753.50
- Balok 20x30 (B3) 9.60 m2 76,975.13 738,961.25
Plat Lantai
- Plat Lantai t=12 cm 1.30 m2 72,036.13 93,358.82
- Plat Tutup Tandon t= 7 cm 0.76 m2 72,036.13 54,459.31
- Plat Rumah Panel t= 7 cm 0.76 m2 72,036.13 54,459.31
Dinding Tandon
- Dinding Tandon t = 12 28.08 m2 77,283.13 2,170,110.29
D Pekerjaan Perancah
Kolom
- Poer 30x30 4.08 76,703.00 312,948.24
- Kolom 30X30 (K1) 43.20 m2 76,703.00 3,313,569.60
- Kolom 20X20 (K2) 8.64 m2 76,703.00 662,713.92
Balok -
- Balok 15x20 (RB) 3.92 m2 80,932.50 317,255.40
- Balok 20x35 (BA1) 5.72 m2 80,932.50 462,933.90
- Balok 20x25 (BA2) 4.68 m2 80,932.50 378,764.10
- Balok 20x35 (B1) 10.56 m2 80,932.50 854,647.20
- Balok 20x40 (B2) 11.52 m2 80,932.50 932,342.40
- Balok 20x30 (B3) 9.60 m2 80,932.50 776,952.00
Plat Lantai -
- Plat Lantai t=12 cm 1.30 m2 85,272.00 110,512.51
- Plat Tutup Tandon t= 7 cm 0.76 m2 85,272.00 64,465.63
- Plat Rumah Panel t= 7 cm 0.76 m2 85,272.00 64,465.63
Dinding Tandon
- Dinding Tandon t = 12 28.08 m2 48,290.00 1,355,983.20
E Pekerjaan Rabat Lantai Beton t = 7 cm Fc. = 7.4 Mpa (K100 ) 0.49 m³ 800,178.50 392,087.47
F Pekerjaan Pasang Waterstop PVC Tandon 12.00 m' 96,432.05 1,157,184.60
G Pekerjaan Cat water profing tandon 36.18 m2 82,524.75 2,985,745.46
SUB JUMLAH III 74,811,996.51
IV PEKERJAAN RUMAH PANEL DAN TANGGA BESI
A Pekerjaan Pasangan Batu Bata 20.40 m2 110,658.13 2,256,872.56
B Pekerjaan Kolom Praktis 5.30 m' 65,584.20 347,596.26
C Pekerjaan Pleteran 40.79 m2 47,847.43 1,951,696.67
D Pekerjaan Acian 40.79 m2 48,141.98 1,963,711.36
E Pekerjaan Pengecatan Total Tandon 162.59 m2 20,333.80 3,306,072.54
F Pekerjaan Tangga besi siku 40x40x2 + erection 65.34 kg 24,452.93 1,597,754.45
G Pekerjaan Pengecatan besi Tangga 4.54 m2 26,268.19 119,152.51

15 of 84
HARGA
NO URAIAN PEKERJAAN VOLUME SAT. SATUAN JUMLAH
(Rp) (Rp)
SUB JUMLAH IV 11,542,856.35

16 of 84
HARGA
NO URAIAN PEKERJAAN VOLUME SAT. SATUAN JUMLAH
(Rp) (Rp)
V PEKERJAAN KUSEN, PINTU DAN JENDELA
A Pek. Pas. Kusen Pintu + Daun Pintu ( Kayu Meranti ) 1.00 set 2,985,511.93 2,985,511.93
B Pek. Pas. Bouvenli+jeruji besi dia 16 mm 1.00 set 308,871.86 308,871.86
C Pek. Pas. Glabox 0.48 m2 572,230.12 274,670.46
SUB JUMLAH V 3,569,054.25
VI PEKERJAAN INSTALASI TANDON( INLET + OUTLET )TANDON
A Pipa GIP ∅ 1" (PIPA INLET) 10.00 m' 154,434.50 1,544,345.00
B Pipa GIP ∅ 2" (PIPA OUTLET) 7.00 m' 154,434.50 1,081,041.50
C Pipa GIP ∅ 1" (pembuangan) 7.00 m' 94,726.50 663,085.50
D Pipa GIP ∅ 1" (peluap) 3.00 m' 94,726.50 284,179.50
E Gate Valve ∅ 1" 2.00 bh 362,767.50 725,535.00
F Flange Las ∅ 2" 5.00 bh 54,243.20 271,216.00
G Flange Las ∅ 1" 14.00 bh 54,243.20 759,404.80
H Flange Spigot ∅ 2" 1.00 bh 115,000.00 115,000.00
I Flange Socket ∅ 1" 1.00 bh 69,000.00 69,000.00
J Bend All Flange 90° GIP dia. 2" 1.00 bh 212,722.40 212,722.40
K Bend All Flange 90° GIP dia. 1" 2.00 bh 59,800.00 119,600.00
L Tee All Flange GIP dia. 1" 1.00 bh 253,910.80 253,910.80
SUB JUMLAH VI 5,845,129.70
VII PEKERJAAN BAK KONTROL
A Galian Tanah 0.35 m3 45,518.55 15,931.49
B Pas. Bata putih 2.00 m2 110,658.13 221,316.26
C Plester 4.00 m2 47,487.43 189,949.72
D Acian 4.00 m2 48,141.98 192,567.92
E Tutup plat 0.74 m2 864,106.54 639,093.20
SUB JUMLAH VII 1,258,858.59
VIII PEKERJAAN INSTALASI LISTRIK
A Pek. Pas. LVMDP -
- Box Panel 40x60x25 1.00 unit 352,314.00 352,314.00
- MCB 10A / 1P 1.00 unit 32,264.40 32,264.40
- MCB 10A / 3P 1.00 unit 177,744.00 177,744.00
- Kontaktor 3 Phase/12A 1.00 bh 153,088.00 153,088.00
B Pek. Pas. Instalasi titik lampu 2.00 ttk 165,246.41 330,492.82
C Pek. Pas. Instalasi saklar ganda 1.00 ttk 192,629.80 192,629.80
D Pek. Pas. Instalasi stop kontak 1.00 ttk 72,932.51 72,932.51
E Pek. Pas. Lampu SL 18 Watt 2.00 bh 57,315.50 114,631.00
F Pek. Penyambungan daya baru (PLN) 2200 VA 1.00 Is 5,428,000.00 5,428,000.00
G Pek. Kabel twisted 2 x 16 mm2 25.00 m' 5,336.00 133,400.00
H Pek. Kabel power pompa NYY 4 x 4 mm2 55.00 m' 23,920.00 1,315,600.00
SUB JUMLAH VIII 8,303,096.53
IX PEKERJAAN SUMUR DAN POMPA
A Uji Pemompaan Sumur (Pumping Test) Introduction, Step, Long, Recovery 48.00 Jam 139,738.50 6,707,448.00
B Pasang Pompa Jet Pump (0,5 - 1 L/s,H suc =20 m, H discharge = 18 m,Daya = 817 w) 1.00 unit 8,700,000.00 8,700,000.00
C Pek. Pas. Pipa GIP.1" (inlet sumur+aksesories) 28.00 m 94,726.50 2,652,342.00
D Water Level Control Omron 61F @tangki 1.00 set 581,900.00 581,900.00
E Pasang manometer 1.00 unit 207,000.00 207,000.00
F Pasang Air Valve 1.00 unit 280,600.00 280,600.00
G Pasang Check Valve ∅ 2" 1.00 unit 806,150.00 806,150.00
H Pasang Gate Valve ∅ 2" 1.00 unit 362,767.50 362,767.50
I Pek. Pas. Flange socket ∅ 2" 2.00 unit 149,500.00 299,000.00
J Pek. Pas. Flange Las ∅ 2" 2.00 bh 86,021.32 172,042.64
SUB JUMLAH IX 20,769,250.14
X PEKERJAAN BOX POMPA
A Galian Tanah 0.47 m3 45,518.55 21,302.68
B Pas. Bata putih 5.44 m2 110,658.13 601,980.23
C Plester 2.88 m2 47,487.43 136,763.80
D Acian 2.88 m2 48,141.98 138,648.90
E Tutup plat 0.88 m2 864,106.54 761,796.33
SUB JUMLAH X 1,660,491.94

17 of 84
HARGA
NO URAIAN PEKERJAAN VOLUME SAT. SATUAN JUMLAH
(Rp) (Rp)
XI PEMASANGAN PIPA Ø 2" RRJ S 12.5 L: 45 m'
A Pekerjaan Galian Tanah 2.52 m³ 45,518.55 114,706.75
B Pekerjaan Urugan Tanah Kembali 2.39 m³ 26,680.50 63,743.50
C Pekerjaan Pembuangan tanah 0.13 m³ 32,145.85 4,206.54
D Pekerjaan Pengadaan & Pemasangan Pipa
- Pipa PVC AW Ø 2" RRJ S 12.5 45.00 m' 39,792.50 1,790,662.50
E Pekerjaan Pencucian Pipa
- Pipa PVC AW Ø 2" RRJ S 12.5 45.00 m' 504.62 22,707.90
F Pekerjaan Pengetesan Pipa
- Pipa PVC AW Ø 2" RRJ S 12.5 45.00 m' 1,207.26 54,326.70
G Pekerjaan Bor Jacking Pipa
- Pek. Jacking Pipa Ø 3" + Selubung Pipa GIP Ø 3" 3.00 m' 282,040.00 846,120.00
H Aksesories dan pemasangannya
- Tee All Socked PVC ( RR ) Ø 63mm x Ø 63mm 1.00 bh 127,052.00 127,052.00
- Reducer PVC RR Φ 2" - 1" 2.00 bh 153,640.00 307,280.00
- Bend Double Socket RR 90˚x Ø 63mm 1.00 bh 118,128.00 118,128.00
SUB JUMLAH XI 3,448,933.89
XII PEMASANGAN PIPA PVC AW Ø 1" L: 923 m'
A Pekerjaan Galian Tanah 55.02 m³ 45,518.55 2,504,430.62
B Pekerjaan Urugan Tanah Kembali 52.16 m³ 26,680.00 1,391,707.11
C Pekerjaan Pembuangan tanah 2.86 m³ 32,145.85 91,842.78
D Pekerjaan Pengadaan & Pemasangan Pipa
- Pipa PVC AW Ø 1" 923.00 m' 27,169.78 25,077,706.94
E Pekerjaan Pencucian Pipa
- Pipa PVC AW Ø 1" 923.00 m' 504.63 465,773.49
F Pekerjaan Pengetesan Pipa
- Pipa PVC AW Ø 1" 923.00 m' 1,207.26 1,114,300.98
G Pekerjaan Bor Jacking Pipa
- Pek. Jacking Pipa Ø 2" + Selubung Pipa GIP Ø 2" 6.00 m' 233,344.00 1,400,064.00
H Aksesories dan pemasangannya
- End Cup PVC Φ 1" 4.00 bh 4,784.00 19,136.00
- Tee all socket PVC Ø 1" 2.00 bh 5,244.00 10,488.00
SUB JUMLAH XII 32,075,449.92
XIII PIPA DISTRIBUSI + SAMBUNGAN RUMAH (35 SR)
A Pekerjaan Galian Tanah 12.60 m³ 45,518.55 573,533.73
B Pekerjaan Urugan Tanah Kembali 12.57 m³ 26,680.50 335,487.07
C Pekerjaan Pembuangan tanah 0.03 m³ 22,145.85 570.43
D Pekerjaan Pengadaan & Pemasangan Pipa
- Pipa PVC AW Ø 1/2" (Sambungan Rumah) 210.00 m' 17,287.60 3,630,396.00
E Pekerjaan Pencucian Pipa
- Pipa PVC AW Ø 1/2" (Sambungan Rumah) 210.00 m' 504.62 105,970.20
F Pekerjaan Pengetesan Pipa
- Pipa PVC AW Ø 1/2" (Sambungan Rumah) 210.00 m' 1,207.26 253,524.60
G Aksesories dan pemasangannya
- Clamp Sadle PVC (2" - 1/2") 35.00 bh 28,520.00 998,200.00
- Kran air dia. 1/2" 35.00 bh 32,200.00 1,127,000.00
- Meteran air dia. 1/2" 35.00 bh 106,563.60 3,729,726.00
XIV PEKERJAAN PLENGSENGAN H=1.6, P=15
- Pekerjaan Galian Tanah 4.52 m3 45,518.55 205,783.90
- Pekerjaan Pasangan Batu Gunung 12.56 m3 830,727.92 10,432,281.22
- Pekerjaan Plesteran 1.00 m2 47,487.43 47,707.77
- Pekerjaan Acian 1.00 m2 48,141.98 48,365.36

SUB JUMLAH XIII 21,488,546.28


JUMLAH Rp 196,294,144.38
PPN 10% Rp 19,629,414.44
JUMLAH TOTAL Rp 215,923,558.82
DIBULATKAN Rp 215,900,000.00

18 of 84
RENCANA ANGGARAN BIAYA
(Engineer Estimate)

KEGIATAN : PENGEMBANGAN SISTEM DISTRIBUSI AIR MINUM (DAK)


PEKERJAAN : PEMBANGUNAN SARANA DAN PRASARANA AIR BERSIH
LOKASI : DESA KARANGGAYAM KECAMATAN OMBEN
HPS : Rp 250,000,000.00
TAHUN : 2018

HARGA
NO URAIAN PEKERJAAN VOLUME SAT. SATUAN JUMLAH
(Rp) (Rp)
I PEKERJAAN PERSIAPAN
A Pembersihan Lokasi 36.00 m2 5,827.80 209,800.80
B Papan nama proyek 1.00 ls 500,000.00 500,000.00
C Pemasangan Bowplank 16.00 m' 155,670.39 2,490,726.30
D Pengujian Tanah di lapangan (Sondir) 1.00 Titik 4,000,000.00 4,000,000.00
SUB JUMLAH I 7,200,527.10
II PEKERJAAN TANAH DAN PONDASI
A Pekerjaan Galian Tanah 14.64 m³ 54,684.19 800,576.54
B Pekerjaan Bor Pondasi strauss Dia. 30 cm H: 3 m' 36.00 m' 85,170.00 3,066,120.00
C Pekerjaan Urugan Tanah Kembali 9.02 m³ 32,052.90 288,988.95
D Pekerjaan Urug Sirtu 1.96 m³ 170,654.00 334,481.84
E Pekerjaan Pasangan Batu Gunung 1pc : 4ps 5.71 m³ 955,207.00 5,456,142.38
SUB JUMLAH II 9,946,309.71
III PEKERJAAN STRUKTUR BETON
A Pekerjaan Beton, mutu f'c=19,3 Mpa (K225)
Pekerjaan Beton Pondasi, mutu f'c=19,3 Mpa (K225)
- Strauss dia. 30 cm,P=3m @4 2.54 m³ 1,166,386.94 2,966,588.54
- Footplat uk.1.2X1.2X0.3 1.73 m³ 1,166,386.94 2,015,516.63
- Poer 30x30 0.31 m³ 1,166,386.94 356,914.40
Pekerjaan Beton Sloof, mutu f'c=19,3 Mpa (K225)
- Sloof 15x20 0.08 m³ 1,166,386.94 94,477.34
- Sloof 20x35 0.67 m³ 1,166,386.94 783,812.02
Pekerjaan Beton Kolom, mutu f'c=19,3 Mpa (K225)
- Kolom 30X30 (K1) 3.24 m³ 1,166,386.94 3,779,093.68
- Kolom 20X20 (K2) 0.43 m³ 1,166,386.94 503,879.16
Pekerjaan Beton Balok, mutu f'c=19,3 Mpa (K225) -
- Balok 15x20 (RB) 0.16 m³ 1,166,386.94 181,956.36
- Balok 20x35 (BA1) 0.36 m³ 1,166,386.94 424,564.85
- Balok 20x25 (BA2) 0.26 m³ 1,166,386.94 303,260.60
- Balok 20x35 (B1) 0.67 m³ 1,166,386.94 783,812.02
- Balok 20x40 (B2) 0.77 m³ 1,166,386.94 895,785.17
- Balok 20x30 (B3) 0.58 m³ 1,166,386.94 671,838.88
Pekerjaan Beton Plat Lantai, mutu f'c=19,3 Mpa (K225)
- Plat Lantai t=12 cm 0.87 m³ 1,166,386.94 1,020,355.29
- Plat Tutup Tandon t= 7 cm 0.51 m³ 1,166,386.94 595,207.25
- Plat Rumah Panel t= 7 cm 0.51 m³ 1,166,386.94 595,207.25
Pekerjaan Beton Dinding Tandon ,mutu f'c=19,3 Mpa (K225)
- Dinding Tandon t = 12 3.37 m³ 1,166,386.94 3,930,257.43
B Pekerjaan Pembesian
Pondasi
- Strauss dia. 30 cm,P=3m @4 353.85 kg 12,848.88 4,546,537.47
- Footplat uk.1.2X1.2X0.3 181.81 kg 12,848.88 2,336,096.61
- Poer 30x30 58.87 kg 12,848.88 756,392.39
Sloof
- Pekerjaan Sloof 15x20 15.98 kg 12,848.88 205,320.99
- Pekerjaan Sloof 20x35 20.99 kg 12,848.88 269,705.60
Kolom
- Kolom 30X30 (K1) 615.51 kg 12,848.88 7,908,660.38
- Kolom 20X20 (K2) 105.11 kg 12,848.88 1,350,555.85

19 of 84
HARGA
NO URAIAN PEKERJAAN VOLUME SAT. SATUAN JUMLAH
(Rp) (Rp)
Balok
- Balok 15x20 (RB) 30.54 kg 12,848.88 392,391.23
- Balok 20x35 (BA1) 80.41 kg 12,848.88 1,033,195.50
- Balok 20x25 (BA2) 55.79 kg 12,848.88 716,849.09
- Balok 20x35 (B1) 123.73 kg 12,848.88 1,589,843.52
- Balok 20x40 (B2) 186.86 kg 12,848.88 2,400,988.18
- Balok 20x30 (B3) 181.81 kg 12,848.88 2,336,096.61
Plat Lantai
- Plat Lantai t=12 cm 273.25 kg 12,848.88 3,510,988.94
- Plat Tutup Tandon t= 7 cm 273.25 kg 12,848.88 3,510,988.94
- Plat Rumah Panel t= 7 cm 273.25 kg 12,848.88 3,510,988.94
Dinding Tandon -
- Dinding Tandon t = 12 263.13 kg 12,848.88 3,380,952.31
C Pekerjaan Bekisting
Kolom
- Poer 30x30 4.08 m2 90,186.51 367,960.98
- Kolom 30X30 (K1) 43.20 m2 90,186.51 3,896,057.40
- Kolom 20X20 (K2) 8.64 m2 90,186.51 779,211.48
Sloof
- Pekerjaan Sloof 15x20 7.56 m2 93,094.22 703,792.31
- Pekerjaan Sloof 20x35 10.56 m2 93,094.22 983,074.97
Balok -
- Balok 15x20 (RB) 3.92 m2 88,745.75 347,883.32
- Balok 20x35 (BA1) 5.72 m2 88,745.75 507,625.66
- Balok 20x25 (BA2) 4.68 m2 88,745.75 415,330.09
- Balok 20x35 (B1) 10.56 m2 88,745.75 937,155.07
- Balok 20x40 (B2) 11.52 m2 88,745.75 1,022,350.98
- Balok 20x30 (B3) 9.60 m2 88,745.75 851,959.15
Plat Lantai
- Plat Lantai t=12 cm 1.30 m2 82,598.95 107,048.23
- Plat Tutup Tandon t= 7 cm 0.76 m2 82,598.95 62,444.80
- Plat Rumah Panel t= 7 cm 0.76 m2 82,598.95 62,444.80
Dinding Tandon
- Dinding Tandon t = 12 28.08 m2 89,117.55 2,502,420.66
D Pekerjaan Perancah
Kolom
- Poer 30x30 4.08 96,580.88 394,049.99
- Kolom 30X30 (K1) 43.20 m2 96,580.88 4,172,294.02
- Kolom 20X20 (K2) 8.64 m2 96,580.88 834,458.80
Balok -
- Balok 15x20 (RB) 3.92 m2 101,923.80 399,541.30
- Balok 20x35 (BA1) 5.72 m2 101,923.80 583,004.14
- Balok 20x25 (BA2) 4.68 m2 101,923.80 477,003.38
- Balok 20x35 (B1) 10.56 m2 101,923.80 1,076,315.33
- Balok 20x40 (B2) 11.52 m2 101,923.80 1,174,162.18
- Balok 20x30 (B3) 9.60 m2 101,923.80 978,468.48
Plat Lantai -
- Plat Lantai t=12 cm 1.30 m2 108,334.60 140,401.64
- Plat Tutup Tandon t= 7 cm 0.76 m2 108,334.60 81,900.96
- Plat Rumah Panel t= 7 cm 0.76 m2 108,334.60 81,900.96
Dinding Tandon
- Dinding Tandon t = 12 28.08 m2 59,973.54 1,684,057.00
E Pekerjaan Rabat Lantai Beton t = 7 cm Fc. = 7.4 Mpa (K100 ) 0.49 m³ 1,003,605.35 491,766.62
F Pekerjaan Pasang Waterstop PVC Tandon 12.00 m' 106,188.61 1,274,263.32
G Pekerjaan Cat water profing tandon 36.18 m2 96,802.20 3,502,303.60
SUB JUMLAH III 90,551,731.06
IV PEKERJAAN RUMAH PANEL DAN TANGGA BESI
A Pekerjaan Pasangan Batu Bata 20.40 m2 125,849.90 2,566,708.71
B Pekerjaan Kolom Praktis 5.30 m' 78,416.91 415,609.62
C Pekerjaan Pleteran 40.79 m2 58,132.80 2,371,236.91
D Pekerjaan Acian 40.79 m2 58,575.00 2,389,274.25
E Pekerjaan Pengecatan Total Tandon 162.59 m2 23,579.05 3,833,717.74
F Pekerjaan Tangga besi siku 40x40x2 + erection 65.34 kg 29,336.74 1,916,862.33
G Pekerjaan Pengecatan besi Tangga 4.54 m2 32,826.59 148,901.42

20 of 84
HARGA
NO URAIAN PEKERJAAN VOLUME SAT. SATUAN JUMLAH
(Rp) (Rp)
SUB JUMLAH IV 13,642,310.99

21 of 84
HARGA
NO URAIAN PEKERJAAN VOLUME SAT. SATUAN JUMLAH
(Rp) (Rp)
V PEKERJAAN KUSEN, PINTU DAN JENDELA
A Pek. Pas. Kusen Pintu + Daun Pintu ( Kayu Meranti ) 1.00 set 3,580,738.96 3,580,738.96
B Pek. Pas. Bouvenli+jeruji besi dia 16 mm 1.00 set 361,819.84 361,819.84
C Pek. Pas. Glabox 0.48 m2 627,341.00 301,123.68
SUB JUMLAH V 4,243,682.48
VI PEKERJAAN INSTALASI TANDON( INLET + OUTLET )TANDON
A Pipa GIP ∅ 1" (PIPA INLET) 10.00 m' 109,348.80 1,093,488.00
B Pipa GIP ∅ 2" (PIPA OUTLET) 7.00 m' 174,248.80 1,219,741.60
C Pipa GIP ∅ 1" (pembuangan) 7.00 m' 109,348.80 765,441.60
D Pipa GIP ∅ 1" (peluap) 3.00 m' 109,348.80 328,046.40
E Gate Valve ∅ 1" 2.00 bh 394,000.00 788,000.00
F Flange Las ∅ 2" 5.00 bh 58,960.00 294,800.00
G Flange Las ∅ 1" 14.00 bh 58,960.00 825,440.00
H Flange Spigot ∅ 2" 1.00 bh 125,000.00 125,000.00
I Flange Socket ∅ 1" 1.00 bh 75,000.00 75,000.00
J Bend All Flange 90° GIP dia. 2" 1.00 bh 231,220.00 231,220.00
K Bend All Flange 90° GIP dia. 1" 2.00 bh 65,000.00 130,000.00
L Tee All Flange GIP dia. 1" 1.00 bh 275,990.00 275,990.00
SUB JUMLAH VI 5,876,177.60
VII PEKERJAAN BAK KONTROL
A Galian Tanah 0.35 m3 54,684.19 19,139.47
B Pas. Bata putih 2.00 m2 125,849.90 251,699.80
C Plester 4.00 m2 58,132.80 232,531.20
D Acian 4.00 m2 58,575.00 234,300.00
E Tutup plat 0.74 m2 969,777.60 717,247.51
SUB JUMLAH VII 1,454,917.98
VIII PEKERJAAN INSTALASI LISTRIK
A Pek. Pas. LVMDP -
- Box Panel 40x60x25 1.00 unit 382,950.00 382,950.00
- MCB 10A / 1P 1.00 unit 35,070.00 35,070.00
- MCB 10A / 3P 1.00 unit 193,200.00 193,200.00
- Kontaktor 3 Phase/12A 1.00 bh 166,400.00 166,400.00
B Pek. Pas. Instalasi titik lampu 2.00 ttk 187,300.23 374,600.47
C Pek. Pas. Instalasi saklar ganda 1.00 ttk 237,080.01 237,080.01
D Pek. Pas. Instalasi stop kontak 1.00 ttk 89,071.40 89,071.40
E Pek. Pas. Lampu SL 18 Watt 2.00 bh 62,843.00 125,686.00
F Pek. Penyambungan daya baru (PLN) 2200 VA 1.00 Is 5,996,250.00 5,996,250.00
G Pek. Kabel twisted 2 x 16 mm2 25.00 m' 5,800.00 145,000.00
H Pek. Kabel power pompa NYY 4 x 4 mm2 55.00 m' 26,000.00 1,430,000.00
SUB JUMLAH VIII 9,175,307.88
IX PEKERJAAN SUMUR DAN POMPA
A Uji Pemompaan Sumur (Pumping Test) Introduction, Step, Long, Recovery 48.00 Jam 180,164.60 8,647,900.80
B Pasang Pompa Jet Pump (0,5 - 1 L/s,H suc =20 m, H discharge = 18 m,Daya = 817 w) 1.00 unit 7,800,000.00 7,800,000.00
C Pek. Pas. Pipa GIP.1" (inlet sumur+aksesories) 28.00 m 109,348.80 3,061,766.40
D Water Level Control Omron 61F @tangki 1.00 set 632,500.00 632,500.00
E Pasang manometer 1.00 unit 225,000.00 225,000.00
F Pasang Air Valve 1.00 unit 305,900.00 305,900.00
G Pasang Check Valve ∅ 2" 1.00 unit 876,250.00 876,250.00
H Pasang Gate Valve ∅ 2" 1.00 unit 394,000.00 394,000.00
I Pek. Pas. Flange socket ∅ 2" 2.00 unit 162,500.00 325,000.00
J Pek. Pas. Flange Las ∅ 2" 2.00 bh 94,241.40 188,482.80
SUB JUMLAH IX 22,456,800.00
X PEKERJAAN BOX POMPA
A Galian Tanah 0.47 m3 54,684.19 25,592.20
B Pas. Bata putih 5.44 m2 125,849.90 684,623.46
C Plester 2.88 m2 58,132.80 167,422.46
D Acian 2.88 m2 58,575.00 168,696.00
E Tutup plat 0.88 m2 969,777.60 854,955.93
SUB JUMLAH X 1,901,290.05

22 of 84
HARGA
NO URAIAN PEKERJAAN VOLUME SAT. SATUAN JUMLAH
(Rp) (Rp)
XI PEMASANGAN PIPA Ø 2" RRJ S 12.5 L: 45 m'
A Pekerjaan Galian Tanah 2.52 m³ 54,684.19 137,804.16
B Pekerjaan Urugan Tanah Kembali 2.39 m³ 32,052.90 76,578.93
C Pekerjaan Pembuangan tanah 0.13 m³ 38,598.23 5,050.88
D Pekerjaan Pengadaan & Pemasangan Pipa
- Pipa PVC AW Ø 2" RRJ S 12.5 45.00 m' 47,415.50 2,133,697.50
E Pekerjaan Pencucian Pipa
- Pipa PVC AW Ø 2" RRJ S 12.5 45.00 m' 586.03 26,371.13
F Pekerjaan Pengetesan Pipa
- Pipa PVC AW Ø 2" RRJ S 12.5 45.00 m' 1,380.50 62,122.50
G Pekerjaan Bor Jacking Pipa
- Pek. Jacking Pipa Ø 3" + Selubung Pipa GIP Ø 3" 3.00 m' 297,000.00 891,000.00
H Aksesories dan pemasangannya
- Tee All Socked PVC ( RR ) Ø 63mm x Ø 63mm 1.00 bh 167,000.00 167,000.00
- Reducer PVC RR Φ 2" - 1" 2.00 bh 141,300.00 282,600.00
- Bend Double Socket RR 90˚x Ø 63mm 1.00 bh 138,100.00 138,100.00
SUB JUMLAH XI 3,920,325.10
XII PEMASANGAN PIPA PVC AW Ø 1" L: 923 m'
A Pekerjaan Galian Tanah 55.02 m³ 54,684.19 3,008,724.13
B Pekerjaan Urugan Tanah Kembali 52.16 m³ 32,052.90 1,671,973.35
C Pekerjaan Pembuangan tanah 2.86 m³ 38,598.23 110,277.64
D Pekerjaan Pengadaan & Pemasangan Pipa
- Pipa PVC AW Ø 1" 923.00 m' 31,071.70 28,679,179.10
E Pekerjaan Pencucian Pipa
- Pipa PVC AW Ø 1" 923.00 m' 586.03 540,901.08
F Pekerjaan Pengetesan Pipa
- Pipa PVC AW Ø 1" 923.00 m' 1,380.50 1,274,201.50
G Pekerjaan Bor Jacking Pipa
- Pek. Jacking Pipa Ø 2" + Selubung Pipa GIP Ø 2" 6.00 m' 233,200.00 1,399,200.00
H Aksesories dan pemasangannya
- End Cup PVC Φ 1" 4.00 bh 5,200.00 20,800.00
- Tee all socket PVC Ø 1" 2.00 bh 5,700.00 11,400.00
SUB JUMLAH XII 36,716,656.80
XIII PIPA DISTRIBUSI + SAMBUNGAN RUMAH (35 SR)
A Pekerjaan Galian Tanah 12.60 m³ 54,684.19 689,020.79
B Pekerjaan Urugan Tanah Kembali 12.57 m³ 32,052.90 403,040.93
C Pekerjaan Pembuangan tanah 0.03 m³ 38,598.23 994.21
D Pekerjaan Pengadaan & Pemasangan Pipa
- Pipa PVC AW Ø 1/2" (Sambungan Rumah) 210.00 m' 20,330.20 4,269,342.00
E Pekerjaan Pencucian Pipa
- Pipa PVC AW Ø 1/2" (Sambungan Rumah) 210.00 m' 586.03 123,065.25
F Pekerjaan Pengetesan Pipa
- Pipa PVC AW Ø 1/2" (Sambungan Rumah) 210.00 m' 1,380.50 289,905.00
G Aksesories dan pemasangannya
- Clamp Sadle PVC (2" - 1/2") 35.00 bh 31,000.00 1,085,000.00
- Kran air dia. 1/2" 35.00 bh 35,000.00 1,225,000.00
- Meteran air dia. 1/2" 35.00 bh 115,830.00 4,054,050.00
SUB JUMLAH XIII 12,139,418.18
JUMLAH Rp 219,225,454.93
PPN 10% Rp 21,922,545.49
JUMLAH TOTAL Rp 241,148,000.43
DIBULATKAN Rp 241,100,000.00

23 of 84
Back Up Perhitungan Volume Resevoir

Dimensi Luas Pembesian Keliling Berat besi per


Volume Satuan
(m) m' (kg)
No Uraian Jumlah Banyaknya Gambar
P (m) L (m) T (m) (m2) Jarak (m) Jumlah (bh)
bulat (bh)

A PEKERJAAN TANAH
1 Galian Tanah Pondasi 14.64 m3
- Galian Pondasi Menerus 7.2 0.8 0.8 1 4.61 m3
2.2 0.8 0.8 1 1.41

120
K1 S1 K1
- Galian Pondasi Telapak 1.4 1.4 1.1 4 8.62 m3

- Galian Strous Dia. 30 cm @12 3 12 36.00 m'


2 Urugan Kembali dengan sirtu 9.02
- Pondasi Menerus 7.06 m3
2 S1 S1
7.2 0.35 0.8 4.03 m3
2 220
7.2 0.1 0.8 1.15 m3

180
2.2 0.45 0.8 2 1.58 m3
- Pondasi Telapak 1.2 0.2 0.3 4 0.29 m3
3 Urugan Sirtu Lantai Rumah Panel 2.8 2.8 0.25 1 1.96 m3 Kp S2 Kp

120
K1 S1 K1

B PEKERJAAN PONDASI
4 Pasangan Batu 5.71 m3
2.4 0.8 0.8 0.48 4 4.61 m3
2.3 0.8 0.8 0.48 1 1.10 m3

C PEKERJAAN BERTON MUTU f'c=19,3 Mpa (K225).


1 Pondasi mutu f'c=19,3 Mpa (K225). 4.58 m3
- Strouss 36.0 0.07 1 2.54 m3
- Footplate 1.2X1.2X0.3 1.2 1.2 0.3 4 1.73 m3
- Poer UK.30x30-85 CM 0.3 0.3 0.85 4 0.31 m3
Dimensi Luas Pembesian Keliling Berat besi per
Volume Satuan
(m) m' (kg)
No Uraian Jumlah Banyaknya Gambar
P (m) L (m) T (m) (m2) Jarak (m) Jumlah (bh)
bulat (bh)

2 Kolom mutu f'c=19,3 Mpa (K225).


- Kolom 30X30 (K1) 0.3 0.3 9 4 3.24 m3
- Kolom 20X20 (K2) 0.2 0.2 2.7 4 0.43 m3

3 Sloof mutu f'c=19,3 Mpa (K225).


- Sloof 15x20 2.7 0.15 0.2 1 0.08 m3
- Sloof 20x35 2.4 0.2 0.35 4 0.67 m3

4 Balok mutu f'c=19,3 Mpa (K225).


- Balok 15x20 (RB) 2.6 0.15 0.2 2 0.16 m3
- Balok 20x35 (BA1) 2.6 0.2 0.35 2 0.36 m3
- Balok 20x25 (BA2) 2.6 0.2 0.25 2 0.26 m3
- Balok 20x35 (B1) 2.4 0.2 0.35 4 0.67 m3
- Balok 20x40 (B2) 2.4 0.2 0.4 4 0.77 m3
- Balok 20x30 (B3) 2.4 0.2 0.3 4 0.58 m3

5 Plat Lantai mutu f'c=19,3 Mpa (K225).


- Plat Lantai Tandon t=12 cm 2.7 2.7 0.12 1 0.87 m3
- Plat Tutup Tandon t= 7 cm 2.7 2.7 0.07 1 0.51 m3
- Plat Rumah Panel t= 7 cm 2.7 2.7 0.07 1 0.51 m3
Dimensi Luas Pembesian Keliling Berat besi per
Volume Satuan
(m) m' (kg)
No Uraian Jumlah Banyaknya Gambar
P (m) L (m) T (m) (m2) Jarak (m) Jumlah (bh)
bulat (bh)

6 Dinding Tandon t = 12 mutu f'c=19,3 Mpa (K225). 2.6 0.12 2.7 4 3.37 m3

7 Rabat Lantai Beton t = 7 cm Fc. = 7.4 Mpa K100 2.5 2.8 0.07 1 0.49 m3

8 Pas. Waterstop PVC Tandon 12 1 12.00 m'


9 Pek. Cat Waterproofing Tandon 36.18 m2
- Plat 2.7 3 1 8.10 m2 sama dengan poin B.6
- Dinding 2.6 2.7 4 28.08 m2 sama dengan poin B.6
C PEKERJAAN PEMBESIAN
1 Strouss 353.85 Kg
- Pokok ∅ 12 mm 8 8 36 255.67 Kg
- Begel ∅ 8 mm 0.7 1 0.1 10 10 36 98.17 Kg

2 Footplate 1.2X1.2X0.3
- Pokok ∅ 12 mm 3.2 1.2 0.15 16 16 4 181.81 Kg
Dimensi Luas Pembesian Keliling Berat besi per
Volume Satuan
(m) m' (kg)
No Uraian Jumlah Banyaknya Gambar
P (m) L (m) T (m) (m2) Jarak (m) Jumlah (bh)
bulat (bh)

3 Poer UK.30x30-85 CM 58.87 Kg


- Pokok ∅ 16 mm 0.85 4 4 4 21.46 Kg
- Pokok ∅ 12 mm 0.85 8 8 4 24.15 Kg
- Begel ∅ 8 - 150 mm 1.4 0.85 0.15 5.67 6 4 13.26 Kg

4 Kolom 30X30 (K1) 615.51 Kg


- Pokok ∅ 16 mm 9 4 4 4 227.27 Kg sama dengan poin C.2
- Pokok ∅ 12 mm 9 8 8 4 255.67 Kg
- Begel ∅ 8 - 150 mm 1.4 9 0.15 60 60 4 132.57 Kg
5 Kolom 20X20 (K2) 105.11 Kg
- Pokok ∅ 12 mm 2.7 8 8 4 76.70 Kg sama dengan poin C.2
- Begel ∅ 8 - 150 mm 1 2.7 0.15 18 18 4 28.41 Kg
6 Sloof 15x20 15.98 Kg
- Pokok ∅ 12 mm 2.7 4 4 1 9.59 Kg sama dengan poin C.3
- Begel ∅ 8 - 150 mm 0.9 2.7 0.15 18 18 1 6.39 Kg
7 Sloof 20x35 20.99 Kg
- Pokok ∅ 12 mm 2.4 6 6 1 12.78 Kg sama dengan poin C.3
- Begel ∅ 8 - 150 mm 1.3 2.4 0.15 16.00 16 1 8.21 Kg
8 Balok 15x20 (RB) 30.54 Kg
- Pokok ∅ 12 mm 2.6 4 4 2 18.47 Kg Sama dengan poin C.4
- Begel ∅ 8 - 150 mm 0.9 2.6 0.15 17.33 17 2 12.07 Kg
9 Balok 20x35 (BA1) 80.41 Kg
- Pokok ∅ 16 mm 2.6 8 8 2 65.65 Kg Sama dengan poin C.4
- Begel ∅ 8 - 150 mm 1.1 2.6 0.15 17.33 17 2 14.76 Kg
10 Balok 20x25 (BA2) 55.79 Kg
- Pokok ∅ 16 mm 2.6 5 5 2 41.03 Kg Sama dengan poin C.4
- Begel ∅ 8 - 150 mm 1.1 2.6 0.15 17.33 17 2 14.76 Kg
11 Balok 20x35 (B1) 123.73 Kg
- Pokok ∅ 16 mm 2.4 6 6 4 90.91 Kg Sama dengan poin C.4
- Begel ∅ 8 - 150 mm 1.3 2.4 0.15 16.00 16 4 32.83 Kg
12 Balok 20x40 (B2) 186.86 Kg
- Pokok ∅ 16 mm 2.4 10 10 4 151.51 Kg Sama dengan poin C.4
- Begel ∅ 8 - 150 mm 1.4 2.4 0.15 16.00 16 4 35.35 Kg
13 Balok 20x30 (B3) 181.81 Kg
- Pokok ∅ 16 mm 2.4 10 10 4 151.51 Kg Sama dengan poin C.4
- Begel ∅ 8 - 150 mm 1.2 2.4 0.15 16.00 16 4 30.30 Kg
14 Plat Lantai Tandon t=12 cm 273.25 Kg
- Pokok ∅ 12 mm 2.7 2.7 0.1 27.00 30 2 143.82 Kg sama dengan poin C.5
- Bagi ∅ 12 - 100 mm 2.7 2.7 0.1 27.00 27 2 129.44 Kg
14 Plat Tutup Tandon t= 7 cm 273.25 Kg
- Pokok ∅ 12 mm 2.7 2.7 0.1 27.00 30 2 143.82 Kg sama dengan poin C.5
- Bagi ∅ 12 - 100 mm 2.7 2.7 0.1 27.00 27 2 129.44 Kg
15 Plat Rumah Panel t= 7 cm 273.25 Kg
- Pokok ∅ 12 mm 2.7 2.7 0.1 27.00 30 2 143.82 Kg sama dengan poin C.5
- Bagi ∅ 12 - 100 mm 2.7 2.7 0.1 27.00 27 2 129.44 Kg
16 Dinding Tandon t = 12 263.13 Kg
- Pokok ∅ 12 mm 2.6 2.7 0.1 27.00 30 2 138.49 Kg Sama dengan poin C.6
- Bagi ∅ 12 - 100 mm 2.7 2.6 0.1 26.00 26 2 124.64 Kg
D PEKERJAAN BEKISTING
1 Kolom 55.92 m2
- Poer UK.30x30-85 CM 0.3 0.3 0.85 4 4.08 m2 Sama dengan poin C.1
- Kolom 30X30 (K1) 0.3 0.3 9 4 43.20 m2 Sama dengan poin C.2
- Kolom 20X20 (K2) 0.2 0.2 2.7 4 8.64 m2 Sama dengan poin C.2

2 Sloof 18.12 m2
- Sloof 15x20 2.7 0.15 0.2 4 7.56 m2 sama dengan poin C.3
- Sloof 20x35 2.4 0.2 0.35 4 10.56 m2 sama dengan poin C.3

3 Balok 42.08 m2
- Balok 15x20 (RB) 2.8 0.15 0.2 2 3.92 m2
- Balok 20x35 (BA1) 2.6 0.2 0.35 2 5.72 m2 Sama dengan poin C.4
- Balok 20x25 (BA2) 2.6 0.2 0.25 2 4.68 m2 Sama dengan poin C.4
- Balok 20x35 (B1) 2.4 0.2 0.35 4 10.56 m2 Sama dengan poin C.4
- Balok 20x40 (B2) 2.4 0.2 0.4 4 11.52 m2 Sama dengan poin C.4
- Balok 20x30 (B3) 2.4 0.2 0.3 4 9.60 m2 Sama dengan poin C.4

4 Plat Lantai 2.81 m2


- Plat Lantai t=12 cm 2.7 2.7 0.12 1 1.30 m2 Sama dengan poin C.5
- Plat Tutup Tandon t= 7 cm 2.7 2.7 0.07 1 0.76 m2 Sama dengan poin C.5
- Plat Rumah Pompa t= 7 cm 2.7 2.7 0.07 1 0.76 m2 Sama dengan poin C.5

5 Dinding Tandon 2.6 0.12 2.7 4 28.08 m2 sama dengan poin C.6
Dimensi Luas Pembesian Keliling Berat besi per
Volume Satuan
(m) m' (kg)
No Uraian Jumlah Banyaknya Gambar
P (m) L (m) T (m) (m2) Jarak (m) Jumlah (bh)
bulat (bh)

E PEKERJAAN PERANCAH

1 Kolom 51.84 m2
- Poer UK.30x30-85 CM 0.3 0.3 0.85 4 4.08 m2 Sama dengan poin C.1
- Kolom 30X30 (K1) 0.3 0.3 9 4 43.20 m2 Sama dengan poin C.2
- Kolom 20X20 (K2) 0.2 0.2 2.7 4 8.64 m2 Sama dengan poin C.2
Dimensi Luas Pembesian Keliling Berat besi per
Volume Satuan
(m) m' (kg)
No Uraian Jumlah Banyaknya Gambar
P (m) L (m) T (m) (m2) Jarak (m) Jumlah (bh)
bulat (bh)

2 Balok 42.08 m2
- Balok 15x20 (RB) 2.8 0.15 0.2 2 3.92 m2
- Balok 20x35 (BA1) 2.6 0.2 0.35 2 5.72 m2 Sama dengan poin C.4
- Balok 20x25 (BA2) 2.6 0.2 0.25 2 4.68 m2 Sama dengan poin C.4
- Balok 20x35 (B1) 2.4 0.2 0.35 4 10.56 m2 Sama dengan poin C.4
- Balok 20x40 (B2) 2.4 0.2 0.4 4 11.52 m2 Sama dengan poin C.4
- Balok 20x30 (B3) 2.4 0.2 0.3 4 9.60 m2 Sama dengan poin C.4

3 Plat Lantai 2.81 m2


- Plat Lantai t=12 cm 2.7 2.7 0.12 1 1.30 m2 Sama dengan poin C.5
- Plat Tutup Tandon t= 7 cm 2.7 2.7 0.07 1 0.76 m2 Sama dengan poin C.5
- Plat Rumah Panel t= 7 cm 2.7 2.7 0.07 1 0.76 m2 Sama dengan poin C.5

4 Dinding Tandon 2.6 0.12 2.7 4 28.08 m2 sama dengan poin C.6

D PEKERJAAN RUMAH PANEL


1 Pasangan Bt. Bata Putih 8.3 2.65 1 20.40 m2

2 Kolom 15x15 (KP) 2.65 2 5.30 m'


2 Pek.Plesteran 20.395 2 40.79 m2
3 Pek,Acian 20.395 2 40.79 m2
4 Pek.Pengecatan Eksterior waterproof (EXPOSED) 162.59 m2
- Dinding 40.79 2 40.79 m2

- Plat Panel 3 3 2 18.00 m2 sama dengan poin C.5


- Plat Tandon bawah 3 3 2 18.00 m2 sama dengan poin C.5
- Plat Tandon Atas 3 3 2 18.00 m2 sama dengan poin C.5
- Kolom 0.3 0.3 9 4 43.20 m2 sama dengan poin D.1

- Balok 20*35 3 0.9 2 5.40 m2


- Balok 20*30 12 0.8 2 19.20 m2
5 Tangga besi siku 40x40x4 27 2.42 65.34 Kg
6 Pengecatan besi Tangga 27 0.168 4.54 m2
7 Pengecatan zinkcromat Tangga 27 0.168 4.54 m2

Balok 200 / 350 Balok 200 / 300

E PEKERJAAN KUSEN, PINTU DAN JENDELA


1 Pas. Kusen Pintu + Daun Pintu ( Kayu Meranti ) 1 1.00 Set
2 Pas. Bouvenlis+jeruji besi dia 16 mm 1 1.00 set
3 Pas. Glabox 0.6 0.8 0.48 m2
F PEKERJAAN PIPA INLET DAN OUTLET TANDON
1 Pipa GIP ∅ 1" (PIPA INLET) 10 10.00 m'
2 Pipa GIP ∅ 2" (PIPA OUTLET) 7 7.00 m'
3 Pipa GIP ∅ 1" (pembuangan) 7 7.00 m'
4 Pipa GIP ∅ 1" (peluap) 3 3.00 m'
5 Gate Valve ∅ 1" 2 2.00 bh
6 Flange Las ∅ 2" 5 5.00 bh
7 Flange Las ∅ 1" 14 14.00 bh
8 Flange Spigot ∅ 2" 1 1.00 bh
10 Flange Socket ∅ 1" 1 1.00 bh
11 Bend All Flange 90° GIP dia. 2" 2 2.00 bh
12 Bend All Flange 90° GIP dia. 1" 5 5.00 bh
13 Tee All Flange GIP dia. 1" 1 1.00 bh
Dimensi Luas Pembesian Keliling Berat besi per
Volume Satuan
(m) m' (kg)
No Uraian Jumlah Banyaknya Gambar
P (m) L (m) T (m) (m2) Jarak (m) Jumlah (bh)
bulat (bh)

G PEKERJAAN BOX BAK KONTROL


1 Galian Tanah 1 1 0.35 0.35 m3
2 Pas. Bata putih 1 1 0.5 4 2.00 m2
3 Plester 2.000 2 4.00 m2
4 Acian 2.000 2 4.00 m2
5 Tutup plat 0.86 0.86 0.74 m2

H PEKERJAAN BOX POMPA


1 Galian Tanah 1.3 0.9 0.4 0.47 m3
2 Pas. Bata putih 1.9 1.3 0.85 6.4 5.44 m2
3 Plester 1.9 1.3 0.45 6.4 2.88 m2
4 Acian 1.9 1.3 0.45 6.4 2.88 m2
5 Tutup plat 1.16 0.76 0.88 m2
Back Up Perhitungan Volume Pipa,Galian Pipa, dan Rekon
(RENCANA KESELURUHAN)

Dimensi
No Uraian
P (m)
IV PEKERJAAN PEMASANGAN PIPA DAN AKSESORIS

B PEMASANGAN PIPA Ø 2" RRJ S 12.5 L: 45 m'


I Pekerjaan Tanah
1 Galian Tanah
- Pipa PVC AW Ø 2" RRJ S 12.5 42.00
Total Galian Tanah
2 Urugan Kembali
- Pipa PVC AW Ø 2" RRJ S 12.5 42.00
Total Urugan Kembali
3 Pembuangan Tanah
4 Bor Jacking Pipa
- Pek. Jacking Pipa Ø 3" + Selubung Pipa GIP Ø 3" 3.00

II Pemasangan Pipa
3 - Pipa PVC AW Ø 2" RRJ S 12.5 45.00

III Aksesoris Pipa


- Tee All Socked PVC ( RR ) Ø 63mm x Ø 63mm
- Reducer PVC RR Φ 2" - 1"
- Bend Double Socket RR 90˚x Ø 63mm

B PEMASANGAN PIPA PVC AW Ø 1" L: 923 m'


I Pekerjaan Tanah
1 Galian Tanah
- Pipa PVC AW Ø 1" 917.00
Total Galian Tanah
2 Urugan Kembali
- Pipa PVC AW Ø 1" 917.00

Total Urugan Kembali


3 Pembuangan Tanah
4 Bor Jacking Pipa
- Pek. Jacking Pipa Ø 2" + Selubung Pipa GIP Ø 2" 6.00

II Pemasangan Pipa
1 - Pipa PVC AW Ø 1" 923.00

III Aksesoris Pipa


1 - End Cup PVC Φ 1"
- Tee all socket PVC Ø 1"
C PIPA DISTRIBUSI + SAMBUNGAN RUMAH (35 SR)
I Pekerjaan Tanah
1 Galian Tanah
- Pipa PVC AW Ø 1/2" (Sambungan Rumah) 6.00
Total Galian Tanah
2 Urugan Kembali
- Pipa PVC AW Ø 1/2" (Sambungan Rumah) 6.00
Total Urugan Kembali
3 Pembuangan Tanah

II Pemasangan Pipa
- Pipa PVC AW Ø 1/2" (Sambungan Rumah) 6.00

III Aksesoris Pipa


- Clamp Sadle PVC (2" - 1/2")
- Kran air dia. 1/2"
- Meteran air dia. 1/2"
Pipa,Galian Pipa, dan Rekondisi
KESELURUHAN)

Dimensi Luas
Banyaknya Volume Satuan
L (m) T (m) (m )
2

0.20 0.30 2.52 m3


2.52 m3

0.20 0.30 0.0031 2.39 m3


i 2.39 m3
0.13 m3

3.00 m'

45.00 m'

1.00 1.00 bh
2.00 2.00 bh
1.00 1.00 bh

0.20 0.30 55.02 m3


55.02 m3

0.20 0.30 0.0031 52.16 m3

i 52.16 m3
2.86 m3

6.00 m'

923.00 m'

4.00 4.00 bh
2.00 2.00 bh

0.20 0.30 35.00 12.60 m3


12.60 m3

0.20 0.30 0.0001 35.00 12.57 m3


i 12.57 m3
0.03 m3

35.00 210.00 m'

35.00 35.00 bh
35.00 35.00 bh
35.00 35.00 bh
REKAPITUASI ANALISA HARGA SATUAN

KODE
NO SNI URAIAN PEKERJAAN
ANALISA

PEKERJAAN PERSIAPAN
1 PUPR Nomor : 28/PRT/M/2016 T.01.a 1 m2 Pembersihan dan Striping/kosrekan
T.02.b.2 1 m Pemasangan Bowplank
2 Mobilisasi Peralatan, Material, Direksi Kit, transportasi mesin dan perlatan
Demobilisasi Peralatan, Material, Direksi Kit, transportasi mesin dan perlatan
PEKERJAAN SUMUR BOR
3 PUPR Nomor : 28/PRT/M/2016 AT.02 1 m' pengeboran ø 8 3/4"
4 PUPR Nomor : 28/PRT/M/2016 AT.03 1 m' reaming ø 8 3/4" - 12"
5 PUPR Nomor : 28/PRT/M/2016 AT.04 1 m' reaming ø 8 3/4" - 14 3/4"
6 PUPR Nomor : 28/PRT/M/2016 AT.05 Bongkar pasang temporary cassing (ID) 12"
7 PUPR Nomor : 28/PRT/M/2016 AT.09 1 m' pengadaan dan pemasangan cassing pipa 8" PVC AW
8 PUPR Nomor : 28/PRT/M/2016 AT.10 1 m' pengadaan dan pemasangan LC Screen 6"
9 PUPR Nomor : 28/PRT/M/2016 AT.12 1 m3 pengadaan dan pemasangan gravel pack
10 PUPR Nomor : 28/PRT/M/2016 AT.13 1 jam Pencucian Sumur
11 PUPR Nomor : 28/PRT/M/2016 AT.14 1 jam Uji Pompa
12 PUPR Nomor : 28/PRT/M/2016 AT.15 1 lokasi pasang dan bongkar peralatan uji pemompaan
13 PUPR Nomor : 28/PRT/M/2016 Borehole Logging SP dan Resistivity
14 Pendekatan Borehole Logging SP dan Resistivity 1 m
15 Pendekatan Pengadaan dan Pemasangan Pipa Jambang Diameter 8 inchi
16 Pendekatan Pengadaan dan Pemasangan Pipa Buta Diameter 8 inchi
17 Pendekatan Pengadaan dan Pemasangan Pipa Saringan Diameter 8 inchi
18 Pendekatan Pengadaan dan Pemasangan Pipa Konduktor 1.5 inchi
19 Pendekatan Grouting Semen untuk Konstruksi Sumur dan well head
20 Pendekatan Pekerjaan Water Jetting selama 12 jam
21 Pendekatan Pekerjaan Water Jetting selama 1 jam
22 Pendekatan Pekerjaan Air Lift / Compressor Sumur

PEKERJAAN TANAH
23 PUPR Nomor : 28/PRT/M/2016 T.06.a.1 Pekerjaan Galian Tanah biasa Sedalam 1 m
24 PUPR Nomor : 28/PRT/M/2016 T.10.a.1 Pekerjaan Galian Tanah lumpur Sedalam 1 m
25 PUPR Nomor : 28/PRT/M/2016 T.15.a.5 Mengangkut 1 m3 hasil galian dengan jarak angkut 50 m
26 PUPR Nomor : 28/PRT/M/2016 T.14.c 1 m3 Urugan pasir dengan pasir urug
27 PUPR Nomor : 28/PRT/M/2016 T.14.c 1 m3 Urugan sirtu
28 PUPR Nomor : 28/PRT/M/2016 T.14.a. 1 m3 Urugan kembali
29 PUPR Nomor : 28/PRT/M/2017 T.14.b1 1 m3 Pemadatan Tanah
PEKERJAAN BETON
30 PUPR Nomor : 28/PRT/M/2016 B.01.a 1 m3 Membuat lantai kerja beton mutu f'c=1,8 s.d 3,7 (B0: K40 s.d K60)
31 PUPR Nomor : 28/PRT/M/2017 B.02.b Membuat 1 M3 beton mutu f'c=7,4 Mpa (K100), slump (12±2) cm / W/c = 0,87.
32 PUPR Nomor : 28/PRT/M/2016 B.05.b Membuat 1 M3 beton mutu f'c=14,5 Mpa (K175), slump (12±2) cm / W/c = 0,66.
33 PUPR Nomor : 28/PRT/M/2016 B.07.b Membuat 1 M3 beton mutu f'c=19,3 Mpa (K225), slump (12±2)cm / W/c = 0,58.
34 PUPR Nomor : 28/PRT/M/2017 B.10.b Membuat 1 M3 beton mutu f'c=26,4 Mpa (K300), slump (12±2) cm / W/c = 0,58.
35 PUPR Nomor : 28/PRT/M/2018 B.30.b 1 m’ pasangan water stop PVC lebar 200 mm
PEKERJAAN PEMBESIAN
36 PUPR Nomor : 28/PRT/M/2018 A.4.1.1.17 10 Kg Pembesian dengan besi polos
37 PUPR Nomor : 28/PRT/M/2019 1 Kg Pembesian dengan besi polos
PEKERJAAN BEKISTING DAN PERANCAH
38 PUPR Nomor : 28/PRT/M/2016 B.26a 1 m2 Pasang bekisting multiplek 12 mm untuk fondasi dan sloof (3 kali pakai)
39 PUPR Nomor : 28/PRT/M/2016 B.21b 1 m2 Pasang bekisting multiplek 12 mm untuk lantai (3 kali pakai)
40 PUPR Nomor : 28/PRT/M/2016 B.24b 1 m2 Pasang bekisting multiplek 12 mm untuk kolom (3 kali pakai)
41 PUPR Nomor : 28/PRT/M/2016 B.23 b 1 m2 Pasang bekisting multiplek 12 mm untuk balok (3 kali pakai)
42 PUPR Nomor : 28/PRT/M/2017 B.25.b 1 m2 Bekisting dinding beton biasa dengan multiflex 12 mm (3 kali Pakai)
43 PUPR Nomor : 28/PRT/M/2018 B.21.f 1 m2 perancah bekisting lantai menggunakan bamboo Ø 8-10 ,tinggi 4 m dan JAT ≤ 0.8 m
44 PUPR Nomor : 28/PRT/M/2018 B.23.f 1 m2 perancah bekisting balok menggunakan bamboo Ø 8-10 ,tinggi 4 m dan JAT < 1,0 m
45 PUPR Nomor : 28/PRT/M/2019 B.24.f 1 m2 perancah bekisting kolom menggunakan bamboo Ø 8-10 ,tinggi 4 m dan JAT < 1,0 m
46 B.25.d 1 m2 perancah bekisting dinding menggunakan kayu 5/7 ,tinggi maks 2.5 m
PEKERJAAN PASANGAN
47 PUPR Nomor : 28/PRT/M/2015 A.4.4.1.9 Pemasangan 1 m2 Dinding Bata Putih Tebal 1/2 Bata 1pc:2pp
48 PUPR Nomor : 28/PRT/M/2016 A.4.4.1.35 Membuat 1 m’ kolom praktis beton bertulang (11 x 11) cm
48 PUPR Nomor : 28/PRT/M/2016 P.05 1 m3 Pasang pondasi batu kosong (Aanstamping)
49 PUPR Nomor : 28/PRT/M/2016 P.01.b 1 m3 Pasang pondasi batu kali 1 Pc : 3 Ps
50 PUPR Nomor : 28/PRT/M/2017 P.01.c 1 m3 Pasang pondasi batu kali 1 Pc : 4 Ps
1 m2 Pemasangan Glasbox uk.20/20 cm
PEKERJAAN PLESTERAN
51 PUPR Nomor : 28/PRT/M/2017 P.03.a 1 m2 Siaran 1 PC : 2 PP
52 PUPR Nomor : 28/PRT/M/2017 P.04.c 1 m2 Plesteran t. 1 cm 1 PC : 4 PP
PEKERJAAN BAJA
53 AHSP SNI 2013 A.4.2.1.1 1 Kg Pemasangan besi profil
54 AHSP SNI 2013 A.4.2.1.2 1 Kg Pemasangan Rangka Kuda-Kuda Baja IWF
KODE
NO SNI URAIAN PEKERJAAN
ANALISA

AHSP SNI 2013 A.4.2.1.3 100 Kg Pekerjaan Perakitan


1 Kg Pekerjaan Perakitan
AHSP SNI 2013 A.4.2.1.4 1 m2 pintu besi plat baja tebal 3 mm rangkap, rangka baja siku
AHSP SNI 2013 A.4.2.1.5 Pengerjaan 10 cm pengelasan dengan las listrik
55 Pendekatan 1 m2 Pemasangan Pagar BRC
PEKERJAAN PENGECATAN
56 PUPR Nomor : 28/PRT/M/2015 A.4.7.1.10 1 m2 Pengecatan Tembok Baru
57 PUPR Nomor : 28/PRT/M/2016 A.4.7.1.16 1 m2 Pengecatan permukaan baja dengan cat besi
58 Pendekatan 1M2 Pekerjaan Cat Waterproofing
PEKERJAAN PEMASANGAN PIPA
PIPA PVC
59 PUPR Nomor : 28/PRT/M/2016 A.5.1.1 25 1 m1 Pemasangan Pipa PVC tipe AW Ø 1/2"
60 PUPR Nomor : 28/PRT/M/2016 A.5.1.1 27 1 m1 Pemasangan Pipa PVC tipe AW Ø 1"
61 PUPR Nomor : 28/PRT/M/2016 A.8.4.1 1 m1 Pemasangan Pipa PVC Ø 2" RRJ S 12.5
62 PUPR Nomor : 28/PRT/M/2016 A.8.4.1.2 1 m1 Pemasangan Pipa PVC Ø 3"
63 PUPR Nomor : 28/PRT/M/2016 A.8.4.1.3 1 m1 Pemasangan Pipa PVC Ø 4"
64 PUPR Nomor : 28/PRT/M/2016 A.8.4.1.4 1 m1 Pemasangan Pipa PVC Ø 6"
65 PUPR Nomor : 28/PRT/M/2016 A.8.4.1.5 1 m1 Pemasangan Pipa PVC Ø 8"
PIPA GIP
66 PUPR Nomor : 28/PRT/M/2016 A.5.1.1 20 1 m1 Pemasangan Pipa GI Ø 1/2"
67 PUPR Nomor : 28/PRT/M/2018 1 m1 Pemasangan Pipa GI Ø 1"
68 PUPR Nomor : 28/PRT/M/2016 A.8.4.1.33 1 m1 Pemasangan Pipa GI Ø 2"
69 Pendekatan 1 m1 Pemasangan Pipa GI Ø 75 mm
70 PUPR Nomor : 28/PRT/M/2016 A.8.4.1.34 1 m1 Pemasangan Pipa GI Ø 100 mm
71 PUPR Nomor : 28/PRT/M/2016 A.8.4.1.36 1 m1 Pemasangan Pipa GI Ø 150 mm
72 PUPR Nomor : 28/PRT/M/2016 A.8.4.1.37 1 m1 Pemasangan Pipa GI Ø 200 mm
73 PUPR Nomor : 28/PRT/M/2016 A.8.4.1.38 1 m1 Pemasangan Pipa GI Ø 250 mm
PUPR Nomor : 28/PRT/M/2017 PIPA HDPE
74 PUPR Nomor : 28/PRT/M/2016 A.8.4.1.17 1 m1 Pemasangan Pipa HDPE Ø 63 mm
75 PUPR Nomor : 28/PRT/M/2016 1 m1 Pemasangan Pipa HDPE Ø 90 mm
76 PUPR Nomor : 28/PRT/M/2016 A.8.4.1.18 1 m1 Pemasangan Pipa HDPE Ø 100 mm
77 PUPR Nomor : 28/PRT/M/2016 A.8.4.1.20 1 m1 Pemasangan Pipa HDPE Ø 150 mm
78 PUPR Nomor : 28/PRT/M/2016 A.8.4.1.21 1 m1 Pemasangan Pipa HDPE Ø 200 mm
PENGETESAN PIPA
79 PUPR Nomor : 28/PRT/M/2016 A.8.4.5.1 1 m Pengetesan Pipa Ø 2"
80 PUPR Nomor : 28/PRT/M/2016 A.8.4.5.2 1 m Pengetesan Pipa Ø 3"
81 PUPR Nomor : 28/PRT/M/2016 A.8.4.5.3 1 m Pengetesan Pipa Ø 4"
82 PUPR Nomor : 28/PRT/M/2016 A.8.4.5.4 1 m Pengetesan Pipa Ø 6"
83 PUPR Nomor : 28/PRT/M/2016 A.8.4.5.5 1 m Pengetesan Pipa Ø 8"
1 m Pencucian Pipa PVC/GI/HDPE
PEKERJAAN AKSESORIS PIPA
84 Pendekatan Pemasangan Flans Las dia. 2"
85 Pendekatan Pemasangan Flans Las dia. 3"
86 Pendekatan Pemasangan Flans Las dia. 4"
87 Pendekatan Pemasangan Flans Las dia. 6"
88 Pendekatan Pemasangan Flans Las dia. 8"
89 Pendekatan Pemasangan Flans Las dia. 10"
90 PUPR Nomor : 28/PRT/M/2016 A.8.4.3.2 1 Buah Pemasangan Valve 200 mm
91 PUPR Nomor : 28/PRT/M/2016 A.8.4.3.3 1 Buah Pemasangan Valve 250 mm
PEKERJAAN BOR JACKING PIPA
92 Pendekatan 1 m Bor Jacking Pipa Ø Ø 10" + Selubung Pipa GI Ø 10"
93 Pendekatan 1 m Bor Jacking Pipa Ø Ø 8" + Selubung Pipa GI Ø 8"
94 Pendekatan 1 m Bor Jacking Pipa Ø Ø 6" + Selubung Pipa GI Ø 6"
95 Pendekatan 1 m Bor Jacking Pipa Ø 4" + Selubung Pipa GI Ø 4"
96 Pendekatan 1 m Bor Jacking Pipa Ø 3" + Selubung Pipa GI Ø 3"
1 m Bor Jacking Pipa Ø 2" + Selubung Pipa GI Ø 2"
PEKERJAAN REKONDISI
HARGA (RP)

5,827.80
155,670.39
530,000.00
530,000.00

48,918.65
40,370.88
40,563.27
49,218.51
290,219.93
205,796.25
673,970.00
180,164.60
180,164.60
989,340.00
4,633,904.00
38,615.87
412,313.44
413,748.94
413,748.94
46,510.92
442,758.80
1,188,990.00
99,082.50
2,481,490.00

54,684.19
80,617.90
38,598.23
164,120.00
170,654.00
32,052.90
48,565.00

821,572.18
1,003,605.35
1,122,242.52
1,166,386.94
1,170,913.05
106,188.61

128,488.80
12,848.88

93,094.22
82,598.95
90,186.51
88,745.75
89,117.55
108,334.60
101,923.80
96,580.88
59,973.54

125,849.90
78,416.91
406,600.48
994,713.50
955,207.00
627,341.00

58,575.00
58,132.80

28,289.25
28,289.25
HARGA (RP)

104,748.60
1,047.49
969,777.60
59,569.40
579,104.94

23,579.05
32,826.59
96,802.20

20,330.20
31,071.70
47,415.50
43,483.00
56,861.20
190,764.20
272,617.40

68,167.00
109,348.80
174,248.80
238,048.80
325,512.00
456,775.00
866,076.20
1,378,280.20

67,862.85
112,790.70
164,864.70
336,275.50
522,791.50

1,380.50
1,446.50
1,578.50
1,908.50
2,337.50
586.03

94,241.40
111,711.60
144,599.40
220,290.40
309,049.40
388,700.40
4,833,846.60
6,650,606.60

1,485,000.00
968,000.00
546,700.00
403,700.00
297,000.00
233,200.00
HARGA BAHAN DAN UPAH

BAHAN HARGA
No UPAH SAT SATUAN KETERANGAN
SEWA (Rp)

A Daftar Upah
1 Pekerja Oh 78,000.00
2 Pekerja kayu Oh 78,000.00
3 Tukang Oh 93,000.00
4 Kepala tukang Oh 98,000.00
5 Mandor Oh 103,000.00
6 Operator Alat Berat Oh 93,000.00
7 Mekanik Alat Berat Oh 93,000.00
8 Pembantu Operator Alat berat Oh 78,000.00
9 Pembantu Mek s Oh 78,000.00
10 driver/sopir Oh 93,000.00
11 Pembantu Driver/Kenek Oh 78,000.00

B Pipa
1 Pipa PVC AW Ø 1/2" m1 6,000.00
2 Pipa PVC AW Ø 1" m1 12,300.00
3 Pipa PVC AW Ø 1.5" m1 17,750.00
4 Pipa PVC AW Ø 2" m1 26,150.00
Pipa PVC AW Ø 2" RRJ S 12.5 m1 31,700.00
5 Pipa PVC AW Ø 3" m1 26,300.00
6 Pipa PVC AW Ø 4" m1 36,690.00
7 Pipa PVC AW Ø 6" m1 156,070.00
8 Pipa PVC AW Ø 8" m1 220,500.00
9 Pipa air GIP medium 1/2" m1 29,500.00
10 Pipa air GIP medium 3/4" m1 36,000.00
11 Pipa air GIP medium 1" 53,000.00
12 Pipa air GIP medium 2" m1 112,000.00
13 Pipa air GIP medium 3" m1 170,000.00
14 Pipa air GIP medium 4" m1 242,000.00
15 Pipa air GIP medium 6" m1 347,000.00
16 Pipa air GIP medium 8" m1 680,000.00
17 Pipa air GIP medium 10" m1 1,125,000.00
18 Pipa PE, S-8 dia. 63 mm (SDR -17) PN10 m1 55,648.50
19 Pipa PE, S-8 dia. 90 mm (SDR -17) PN10 m1 95,720.00
20 Pipa PE, S-8 dia. 110 mm (SDR -17) PN10 m1 143,060.00
21 Pipa PE, S-8 dia. 125 mm (SDR -17) PN11 m1 182,400.00
22 Pipa PE, S-8 dia. 160 mm (SDR -17) PN10 m1 299,660.00
23 Pipa PE, S-8 dia. 200 mm (SDR -17) PN10 m1 469,220.00
24 Pipa PE, S-8 dia. 250 mm (SDR -17) PN10 m1 729,500.00

C Pipa Fitting dan Aksesoris


1 Bend Las GIP Ø 150 mm 45˚ bh 265,500.00
2 Bend Las GIP Ø 150 mm 22,5˚ bh 232,500.00
3 Bend Las GIP Ø 150 mm 90˚ bh 285,000.00
4 Bend All Flange 90˚ x Ø 25mm bh 65,000.00
5 Bend All Flange 90˚ x Ø 50mm bh 231,220.00
6 Bend All Flange 90˚ x Ø 75mm bh 363,385.00
7 Bend All Flange 90˚ x Ø 100mm bh 418,385.00
8 Bend All Flange 90˚ x Ø 150mm bh 826,925.00
9 Bend All Flange 90˚ x Ø 200mm bh 1,156,155.00
10 Bend All Flange 90˚ x Ø 250mm bh 2,037,035.00
11 Bend All Flange 45˚ x Ø 50mm bh 242,275.00
12 Bend All Flange 45˚ x Ø 75mm bh 286,275.00
13 Bend All Flange 45˚ x Ø 100mm bh 369,985.00
14 Bend All Flange 45˚ x Ø 150mm bh 616,616.00
15 Bend All Flange 45˚ x Ø 200mm bh 924,924.00
16 Bend All Socket 90˚x Ø 25 mm bh 3,500.00
17 Bend All Socket 90˚x Ø 50mm bh 13,000.00
18 Bend All Socket 90˚x Ø 75mm bh 34,400.00
19 Bend All Socket 90˚x Ø 100mm bh 63,800.00
20 Bend All Socket 90˚x Ø 150mm bh 161,400.00
21 Bend All Socket 90˚x Ø 200mm bh 365,700.00
22 Bend All Socket 90˚x Ø 250mm bh 488,700.00
23 Bend All Socket 45˚x Ø 25 mm bh 3,500.00
24 Bend All Socket 45˚x Ø 50mm bh 14,800.00
25 Bend All Socket 45˚x Ø 75mm bh 35,900.00
26 Bend All Socket 45˚x Ø 100mm bh 62,200.00
27 Bend All Socket 45˚x Ø 150mm bh 177,900.00
28 Bend Double Socket RR 90˚x Ø 63mm bh 138,100.00
29 Bend Double Socket RR 90˚x Ø 90mm bh 211,900.00
30 Bend Double Socket RR 90˚x Ø 110mm bh 293,200.00
31 Bend Double Socket RR 90˚x Ø 160mm bh 590,700.00
32 Bend Double Socket RR 90˚x Ø 200mm bh 1,033,000.00
33 Bend Double Socket RR 90˚x Ø 250mm bh 1,785,000.00
34 Bend Double Socket RR 45˚x Ø 63mm bh 128,400.00
35 Bend Double Socket RR 45˚x Ø 90mm bh 176,600.00
36 Bend Double Socket RR 45˚x Ø 110mm bh 267,500.00
37 Bend Double Socket RR 45˚x Ø 150mm bh 535,000.00
38 Blind Flangle PVC dia. 8" bh 231,000.00
39 Cheque valve Gi Ø 2" bh 876,250.00
40 Clamp sadle dia 3"- 1/2" bh 61,000.00
41 Clamp sadle dia 2"- 1/2" bh 31,000.00
42 Clamp Pipa Stainless Ø 3" bh 10,000.00
43 Double Nipple dia 1/2 " bh 4,000.00
44 Double Air Valve Ø 2" bh 1,500,000.00
45 End Cup GI 1/2" bh 3,500.00
46 End Cup PVC Ø 1" bh 5,200.00
47 End Cup PVC Ø 2" bh 26,000.00
48 End Cup PVC Ø 3" bh 30,000.00
49 End Cup PVC Ø 2" bh 26,000.00
50 End Cup PVC Ø 4" bh 26,000.00
51 End Cup PVC Ø 6" bh 69,700.00
52 End Cup PVC Ø 8" bh 136,700.00
53 End Cup Segmented dia. 160 mm bh 670,000.00
54 End Cup Segmented dia. 110 mm bh 357,500.00
55 End Cup Segmented dia. 90 mm bh 342,500.00
56 End Cup Segmented dia. 63 mm bh 342,500.00
57 Elbow Equal Segmented Ø 160 mm 90˚ bh 1,000,000.00
58 Elbow Equal Segmented dia 160 mm 45° bh 890,000.00
59 Elbow Equal Segmented Ø 63 mm 90˚ bh 135,717.00
60 Elbow Equal Segmented Ø 63 mm 45˚ bh 129,374.00
61 Elbow Equal Segmented Ø 90 mm 90˚ bh 213,389.00
62 Elbow Equal Segmented Ø 90 mm 45˚ bh 179,854.00
63 Elbow Equal Segmented Ø 110 mm 90˚ bh 530,000.00
64 Elbow Equal Segmented Ø 110 mm 45˚ bh 475,000.00
65 Elbow Equal Segmented dia 200 mm 90° bh 1,632,500.00
66 Elbow Equal Segmented dia 200 mm 45° bh 1,402,500.00
67 Elbow Equal Segmented Ø 3" x 90° bh 417,500.00
68 Elbow Equal Segmented Ø 2" x 90° bh 240,000.00
69 FCV 4" PN 16 ex.Singer bh 55,510,000.00
70 FCV 6" PN 16 ex.Singer bh 69,160,000.00
71 FCV 10" PN 16 ex.Singer bh 137,410,000.00
72 FCV 12" PN 16 ex.Singer bh 213,850,000.00
73 Flexsible Join Ø 150mm bh 1,265,000.00
74 Flexsible Join Ø 200mm bh 1,954,672.50
75 Flexsible Join Ø 250mm bh 2,775,300.00
76 Flange Las Ø 50 mm bh 58,960.00
77 Flange Las Ø 75mm bh 73,392.00
78 Flange Las Ø 90mm bh 77,220.00
79 Flange Las Ø 100mm bh 101,640.00
80 Flange Las Ø 150mm bh 165,000.00
81 Flange Las Ø 200mm bh 240,240.00
82 Flange Las Ø 250mm bh 303,600.00
83 Flange Las Ø 300mm bh 350,350.00
84 Flange Las Ø 350mm bh 667,040.00
85 Flange Las Ø 400mm bh 875,600.00
86 Flange Spigot PVC Ø 63 mm bh 75,000.00
87 Flange Spigot PVC Ø 63 mm bh 125,000.00
88 Flange Spigot PVC Ø 90 mm bh 144,000.00
89 Flange Spigot PVC RR Ø 110mm bh 179,850.00
90 Flange Spigot PVC RR Ø 160mm bh 355,575.00
91 Flange Spigot PVC RR Ø 200mm bh 623,850.00
92 Flange Socket PVC Ø 50mm bh 162,500.00
93 Flange Socket PVC Ø 75mm bh 213,005.00
94 Flange Socket PVC Ø 100mm bh 257,920.00
95 Flange Socket PVC Ø 150mm bh 416,200.00
96 Flange Socket PVC Ø 200mm bh 734,800.00
97 Flange Socket PVC Ø 250mm bh 1,732,500.00
98 Flange Socket PVC Ø 300mm bh 3,183,675.00
99 Flange Adaptor Ø 2" bh 311,025.00
100 Flange Adaptor Ø 3" bh 404,332.50
101 Flange Adaptor Ø 4" bh 487,987.50
102 Flange Adaptor Ø 6" bh 683,182.50
103 Flange Adaptor Ø 8" bh 1,338,480.00
104 Flange Adaptor Ø 10" bh 1,854,352.50
105 Giboult Joint Ø 400mm bh 2,949,375.00
106 Giboult Joint Ø 350mm bh 1,321,320.00
107 Giboult Joint Ø 300mm bh 1,085,370.00
108 Giboult Joint Ø 250mm bh 825,825.00
109 Giboult Joint Ø 200mm bh 578,006.00
110 Giboult Joint Ø 150mm bh 412,841.00
111 Giboult Joint Ø 100mm bh 259,545.00
112 Giboult Joint Ø 75mm bh 168,597.00
113 Giboult Joint Ø 50mm bh 114,400.00
114 Gate valve Ø 2" bh 394,000.00
115 Gate valve Ø 3" bh 134,720.56
116 Gate valve Ø 4" bh 1,436,500.00
117 Gate valve Ø 6" bh 2,314,000.00
118 Gate valve Ø 8" bh 4,140,900.00
119 Gate valve Ø 10" bh 5,785,000.00
120 Knee drat GI 90º Ø 2" bh 85,000.00
121 Knee drat GI 90 dia 1/2" bh 4,500.00
122 Manometer 10 bar bh 225,000.00
123 Packing karet Ø 3" s/d 2" bh 11,550.00
124 PRV 4" PN 16 ex.Singer bh 31,400,000.00
125 PRV 6" PN 16 ex.Singer bh 45,050,000.00
126 PRV 10" PN 16 ex.Singer bh 109,200,000.00
127 PRV 12" PN 16 ex.Singer bh 165,170,000.00
128 Plug Kran dia 1/2" bh 15,850.00
129 Reducer All Flange Ø 4" x 2" bh 183,326.00
130 Reducer All Flange Ø 4" x 3" bh 265,408.00
131 Reducer All Flange Ø 6" x 2" bh 337,766.00
132 Reducer All Flange Ø 6" x 3" bh 414,986.00
133 Reducer All Flange Ø 6" x 4" bh 646,646.00
134 Reducer All Flange Ø 8" x 2" bh 690,118.00
135 Reducer All Flange Ø 8" x 3" bh 752,895.00
136 Reducer All Flange Ø 8" x 4" bh 820,391.00
137 Reducer All Flange Ø 8" x 6" bh 868,725.00
138 Reducer All Flange Ø 10" x 8" bh 1,303,016.00
139 Reducer All Flange Ø 12" x 10" bh 1,814,670.00
140 Reducer All Flange Ø 14" x 12" bh 2,364,791.00
141 Reducer All Flange Ø 16" x 10" bh 2,664,090.00
142 Reducer PVC RR Ø 3" - 2" bh 141,300.00
143 Reducer PVC RR Ø 4" - 3" bh 228,000.00
144 Reducer PVC RR Ø 4" - 2" bh 104,104.00
145 Reducer PVC RR Ø 6" - 4" bh 250,107.00
146 Reducer PVC RR Ø 6" - 3" bh 230,516.00
147 Reducer PVC RR Ø 8" - 6" bh 490,347.00
148 Reducer PVC RR Ø 10" - 8" bh 1,028,027.00
149 Reducer Segmented dia. 200 mm x 160 mm bh 1,462,500.00
150 Reducer Segmented dia. 160 mm x 110 mm bh 565,000.00
151 Reducer Segmented dia. 110 mm x 90 mm bh 305,000.00
152 Reducer Segmented dia. 110 mm x 63 mm bh 320,000.00
153 Reducer Segmented dia. 90 mm x 63 mm bh 235,000.00
154 Relief Valve 4" PN 16 ex.Singer bh 36,860,000.00
155 Relief Valve 6" PN 16 ex.Singer bh 47,320,000.00
156 Relief Valve 8" PN 16 ex.Singer bh 72,800,000.00
157 Relief Valve 10" PN 16 ex.Singer bh 113,300,000.00
158 Single Air Valve Ø 16mm bh 182,432.25
159 Single Air Valve Ø 20mm bh 182,432.25
160 Single Air Valve Ø 25mm bh 305,900.00
161 Single Air Valve Ø 50mm bh 709,458.75
162 Single Air Valve Ø 75mm bh 861,410.55
163 Single Air Valve Ø 100mm bh 962,761.80
164 Straatpot Ø 50mm bh 60,775.00
165 Straatpot Ø 75mm bh 74,503.00
166 Straatpot Ø 100mm bh 108,537.00
167 Straatpot Ø 150mm bh 152,009.00
168 Straatpot Ø 200mm bh 555,984.00
169 Straatpot Ø 250mm bh 648,648.00
170 Straatpot Ø 300mm bh 868,725.00
171 Strainner flange end dia. 10" bh 1,900,000.00
172 Strainner flange end dia. 8" bh 1,200,000.00
173 Strainner flange end dia. 6" bh 990,000.00
174 Strainner flange end dia. 4" bh 820,000.00
175 Strainner flange end dia. 3" bh 530,000.00
176 Strainner flange end dia. 2" bh 205,000.00
177 Stop kran dia 1/2" bh 35,000.00
178 Stop kran dia 3/4" bh 75,000.00
179 Stop kran dia 1" bh 142,000.00
180 Stub Flange Ø 2" bh 100,000.00
181 Stub Flange Ø 3" bh 150,000.00
182 Stub Flange Ø 4" bh 172,500.00
183 Stub Flange Ø 6" bh 255,000.00
184 Stub Flange Ø 8" bh 377,500.00
185 Tee drat GI dia 1/2" bh 6,500.00
186 Tee all socket PVC Ø 3" bh 125,000.00
187 Tee all socket PVC Ø 2" bh 75,000.00
188 Tee all socket PVC Ø 1" bh 5,700.00
188 Tee All Flange Ø 50mm x Ø 50mm bh 275,990.00
189 Tee All Flange Ø 75mm x Ø 50mm bh 370,656.00
190 Tee All Flange Ø 75mm x Ø 75mm bh 416,988.00
191 Tee All Flange Ø 100mm x Ø 50mm bh 413,985.00
192 Tee All Flange Ø 100mm x Ø 75mm bh 477,763.00
193 Tee All Flange Ø 100mm x Ø 100mm bh 530,816.00
194 Tee All Flange Ø 150mm x Ø 50mm bh 583,869.00
195 Tee All Flange Ø 150mm x Ø 75mm bh 637,065.00
196 Tee All Flange Ø 150mm x Ø 100mm bh 805,948.00
197 Tee All Flange Ø 150mm x Ø 150mm bh 878,306.00
198 Tee All Flange Ø 200mm x Ø 50mm bh 888,030.00
199 Tee All Flange Ø 200mm x Ø 75 mm bh 955,526.00
200 Tee All Flange Ø 200mm x Ø 100 mm bh 1,013,441.00
201 Tee All Flange Ø 200mm x Ø 150 mm bh 1,093,521.00
202 Tee All Flange Ø 200mm x Ø 200 mm bh 1,187,186.00
203 Tee All Flange Ø 250mm x Ø50mm bh 1,220,934.00
204 Tee All Flange Ø 250mm x Ø 75mm bh 1,540,539.00
205 Tee All Flange Ø 250mm x Ø 100mm bh 1,602,315.00
206 Tee All Flange Ø 250mm x Ø 150mm bh 1,689,116.00
207 Tee All Flange Ø 250mm x Ø 200mm bh 1,776,060.00
208 Tee All Flange Ø 250mm x Ø 250mm bh 1,911,195.00
209 Tee All Flange Ø 250mm x Ø 100mm bh 1,602,315.00
210 Tee All Socked PVC ( RR ) Ø 63mm x Ø 63mm bh 167,000.00
211 Tee Reducer PVC ( RR ) Ø 90mm x Ø 63mm bh 240,800.00
212 Tee All Socked PVC ( RR ) Ø 90mm x Ø90mm bh 272,900.00
213 Tee All Socked PVC ( RR ) Ø 110mm x63mm bh 196,768.00
214 Tee All Socked PVC ( RR ) Ø 110mm x 90mm bh 230,516.00
215 Tee All Socked PVC ( RR ) Ø 110mm x 110mm bh 243,958.00
216 Tee All Socked PVC ( RR ) Ø 160mm x 63mm bh 423,995.00
217 Tee All Socked PVC ( RR ) Ø 160mm x 90mm bh 425,425.00
218 Tee All Socked PVC ( RR ) Ø 160mm x 110mm bh 466,895.00
219 Tee All Socked PVC ( RR ) Ø 160mm x 160mm bh 553,696.00
220 Tee All Socked PVC ( RR ) Ø 200mm x 90mm bh 1,055,340.00
221 Tee All Socked PVC ( RR ) Ø 200mm x 110mm bh 1,016,301.00
222 Tee All Socked PVC ( RR ) Ø 200mm x 150mm bh 1,280,279.00
223 Tee All Socked PVC ( RR ) Ø 200mm x 200mm bh 1,406,262.00
224 Tee All Socked PVC ( RR ) Ø 250mm x 150mm bh 2,388,529.00
225 Tee All Socked PVC ( RR ) Ø 250mm x 200mm bh 2,575,430.00
226 Tee All Socked PVC ( RR ) Ø 250mm x 250mm bh 1,547,975.00
227 Tee Equal Segmented dia. 160 mm bh 1,110,000.00
228 Tee Equal Segmented dia. 110 mm bh 545,000.00
229 Tee Equal Segmented dia. 90 mm bh 390,000.00
230 Tee Equal Segmented dia. 63 mm bh 220,000.00
231 Tee Reducer All Flange dia.250 mm x 110 mm 4,366,500.00
232 Tee reducer PVC Ø 3"-2" bh 31,000.00
233 Tee reducer PVC Ø 2"-1" bh 11,000.00
234 Tee reducer PVC Ø 8"-6" bh 1,280,279.00
235 Tee Reducer Segmented dia.300 mm x 160 mm bh 6,539,533.00
236 Tee Reducer Segmented dia.160 mm x 110 mm bh 1,917,500.00
237 Tee Reducer Segmented dia.160 mm x 90 mm bh 1,917,500.00
238 Tee Reducer Segmented dia.160 mm x 63 mm bh 1,917,500.00
239 Tee Reducer Segmented dia.200 mm x 63 mm bh 4,766,500.00
240 Tee Reducer Segmented dia.200 mm x 90 mm bh 4,766,500.00
241 Tee Reducer Segmented dia.200 mm x 110 mm bh 4,766,500.00
242 Tee Reducer Segmented dia.110 mm x 90 mm bh 1,763,750.00
243 Tee Reducer Segmented dia.110 mm x 63 mm bh 1,358,500.00
244 Tee Reducer Segmented dia.90 mm x 63 mm bh 935,250.00
245 Water Meter Ø 1/2" bh 115,830.00
246 Water Meter Ø 1" bh 530,816.00
247 Water Meter Ø 2" bh 1,808,950.00
248 Water Meter Ø 3" bh 2,137,850.00
249 Water Meter Ø 4" bh 2,302,300.00
250 Water Meter Ø 6" bh 3,667,950.00
251 Water Meter Ø 8" bh 4,111,250.00
D Aspal,Batu ,Semen Dan Keramik
1 Pasir beton m3 373,500.00
2 Pasir urug m3 94,900.00
3 Sirtu urug m3 99,850.00
4 Air lt 300.00
5 Pasir pasang m3 311,000.00
6 Gravel 1/2 m3 328,900.00
7 Gravel 2/3 ex. Lokal m3 200,400.00
8 Gravel 2/3 ex. Jawa m3 350,700.00
9 Agregat Klas A m3 268,900.00
10 Agregat Klas B m3 274,300.00
11 Aspal kg 15,000.00
12 Semen portland kg 1,200.00
13 Semen portland Zak 49,090.00
14 Semen warna kg 15,910.00
15 Thrust Block bh 300,000.00
16 Batu bata Merah Kw 1 bh 1,100.00
17 Batu bata Putih bh 880.00
18 batu belah 15/20 m3 157,450.00
21 Paving stone / Blok 8 cm m2 76,700.00
22 Paving Stone abu-abu 6 cm (K300) m2 76,700.00
23 Kanstin m 45,000.00
19 Jasa Borepile Manual/Galian Starauss D.30 CM m 85,170.00
E Kayu
1 Kaso 5/7 m3 3,596,790.00
2 Kayu dolken gelam 8-10 pajang 4 m Btg 74,100.00
3 Dolken Bamboo Btg 17,340.00
4 Kayu Klos jati 12/15 lengkap dgn begel Ø 16mm Unit 350,000.00
5 Balok Kayu Gelam uk. 6/12 cm m3 3,704,980.00
6 Kayu Kelas III m3 2,800,000.00
7 Plywood tebal 9 mm lbr 143,750.00
8 Plywood tebal 12 mm lbr 190,000.00
9 Lem kayu fox kg 45,630.00
10 Lisplank kalsiplank m' 45,000.00
11 Tali tambang m' 5,000.00

39 of 84
BAHAN HARGA
No UPAH SAT SATUAN KETERANGAN
SEWA (Rp)

F Besi , Paku, Karet, Kaca


1 Besi beton polos kg 9,880.00
2 Besi konstruksi (WF;H;INP;SIKU) kg 12,930.00
3 Besi strip kg 14,900.00
4 Kawat Las kg 75,000.00
5 Kawat bendrat kg 13,110.00
6 Angkur baut Ø 19 mm x 30 cm bh 56,000.00
7 Karet Packing Ø 50mm bh 3,650.00
8 Karet Packing Ø 75mm bh 5,100.00
9 Karet Packing Ø 100mm bh 6,750.00
10 Karet Packing Ø 150mm bh 12,200.00
11 Karet Packing Ø 200mm bh 17,650.00
12 Karet Packing Ø 250mm bh 26,700.00
13 Baut 3/8 bh 4,000.00
14 Paku reng kg 14,030.00
15 Paku Pancing kg 26,000.00
16 Paku payung kg 23,100.00
17 Paku usuk kg 16,900.00
18 Paku Triplek kg 19,060.00
19 Engsel Pintu 3"x2.5" ex.muller pintu alum bh 34,110.00
20 Engsel Pintu 3"x2.5" Ex.Kuningan Kayu Pintu bh 25,770.00
21 Springknip bh 17,070.00
22 Kunci 2x putar bh 75,000.00
23 Kunci Selot/Biasa bh 15,260.00
24 Pegangan pintu bh 140,490.00
25 Water Stop PVC 200mm m' 82,500.00
26 Glassbox Kaca 20x20 bh 20,440.00
27 Pagar BRC ( tinggi 1.9 M' , L=2,4 m) Unit 638,000.00
28 Tiang Pagar BRC Galvalum dia. 2" ( tinggi 2,25 m ) Unit 1,500,000.00
29 Pintu Pagar BRC tinggi 1.8 M', lebar = 4 M Unit 255,000.00
G Instalasi listrik
1 Box panel out door unit 700,000.00
2 Panel Pompa Omron unit 3,000,000.00
3 Kabel NYY 3x2,5 mm2 m 26,000.00
4 Kabel NYA 1X2.5MM Ex.Supreme m 3,150.00
5 Kabel NYA 1X1.5MM Ex.Supreme m 1,920.00
6 Kabel NYM 1X2.5MM Ex.Supreme m 8,650.00
7 Kabel NYM 1X1.5MM Ex.Supreme m 6,070.00
8 Kabel TWIST m 5,800.00
9 Kabel NYY m 26,000.00
10 Stop Kontak BH 11,020.00
11 Saklar Tunggal BH 12,770.00
12 Saklar Ganda BH 14,020.00
13 Saklar Hotel BH 15,530.00
14 Fitting Plafont BH 15,530.00
15 Lasdoof BH 1,600.00
16 Pipa Paralon 5/8" M' 1,120.00
17 T Dos PVC BH 3,090.00
18 Klem PVC Kabel BH 150.00
19 Set Terminal Kabel VA 35,070.00
20 SDP UK.40X60X25 BH 382,950.00
21 SDP UK.60X50X20 BH 486,000.00
22 KONTAKTOR 3P/12A BH 166,400.00
23 MCB 10A/3P UNIT 193,200.00
24 MCB 10A/1p UNIT 35,070.00
25 MAINSWICTH BH 203,250.00
26 SEWA ALAT BANTU LS 121,700.00
27 DOWNLIGHT +REFLECTOR 4" BH 54,000.00
28 KAP LAMPU OFFICE TYPE MIRROR TL 2X18 WATT SET 242,850.00
29 Water Level Control Omron 61F @ 2 tangki set 632,500.00
30 Penyambungan Listrik Baru PLN 2200 VA SET 5,996,250.00
31 Pompa Jet Pump ex.GrundfosCM 5-5 unit 7,500,000.00

G Cat, Bahan bakar


1 Solar ltr 7,800.00
2 Minyak pelumas /Oil ltr 10,300.00
3 Cat kayu/besi EMCO/setara kg 74,150.00
4 Cat tembok kg 23,860.00
5 Cat Waterproof kg 54,500.00
6 Plamir kg 45,520.00
7 Meni besi kg 71,428.57
8 Minyak Bekisting ltr 5,640.00
9 Khuas / rol bh 32,200.00
10 Papan nama unit 750,000.00
I Sewa Alat
1 Sewa Tripod/Tackel &handle Crane 2 T hr 75,000.00
2 Welding set jam 65,000.00
3 Stamper hr 78,000.00
4 Molen hr 140,000.00

40 of 84
ANALISA HARGA SATUAN PEKERJAAN
PUPR Nomor : 28/PRT/M/2016

PEKERJAAN HARGA
NO UPAH KODE VOLUME SAT SATUAN JUMLAH
BAHAN (Rp) (Rp)

1 1 m2 Pembersihan dan Striping/kosrekan T.01.a


Upah :
Pekerja 0.06 oh 78,000.00 4,680.00
Mandor 0.006 oh 103,000.00 618.00
Jumlah Tenaga Kerja 5,298.00
Jumlah,Harga, Dan Tenaga 5,298.00
Overhead + Profit 10% 529.80
Jumlah Total Upah 5,827.80
2 1 m Pemasangan Bowplank T.02.b.2
Upah :
Pekerja 0.1 oh 78,000.00 7,800.00
Tukang Kayu 0.01 oh 93,000.00 930.00
Kepala Tukang 0.01 oh 98,000.00 980.00
Mandor 0.01 oh 103,000.00 1,030.00
Jumlah Tenaga Kerja 10,740.00
Bahan :
Kayu 5/7 0.013 m3 3,596,790.00 46,758.27
Paku 2”-3” 0.02 Kg 16,900.00 338.00
Kayu papan 3/20 0.007 m3 11,954,610.00 83,682.27
Jumlah Bahan 130,778.54
Jumlah,Harga, Dan Tenaga 141,518.54
Overhead + Profit 10% 14,151.85
Jumlah Total Upah 155,670.39

3 Mobilisasi Peralatan, Material, Direksi Kit,


Transportasi Mesin dan Peralatan
1 Dari gudang ke lokasi pengeboran 1.000 rit 250,000.00 250,000.00
2 Biaya bongkar / muat peralatan 1.000 ls 100,000.00 100,000.00
3 Biaya transportasi tenaga kerja 1 regu 1.000 rit 80,000.00 80,000.00
4 Biaya sewa untuk akomodasi 1.000 ls 100,000.00 100,000.00
Total Pekerjaan Mobilisasi Peralatan 530,000.00

4 Demobilisasi Peralatan, Material, Direksi Kit, Transportasi Mesin dan Peralatan


1 Dari lokasi pengeboran kegudang 1.000 rit 250,000.00 250,000.00
2 Biaya bongkar / muat peralatan 1.000 ls 100,000.00 100,000.00
3 Biaya transportasi tenaga kerja 1 regu 1.000 rit 80,000.00 80,000.00
4 Biaya sewa untuk akomodasi 1.000 ls 100,000.00 100,000.00
Total Pekerjaan Demobilisasi Peralatan 530,000.00

5 1 m' pengeboran ø 8 3/4" AT.02


Upah :
Pekerja 0.309 hari 78,000.00 24,086.40
Tukang Bor 0.077 hari 93,000.00 7,179.60
Mandor 0.039 hari 103,000.00 4,017.00
Jumlah Tenaga Kerja 35,283.00
Peralatan :
Borehole ø 8 3/4" 0.541 m 17,000.00 9,188.50
Jumlah Alat 9,188.50

Jumlah,Harga, Dan Tenaga 44,471.50


Overhead + Profit 10% 4,447.15
Jumlah Total Upah 48,918.65

6 1 m' reaming ø 8 3/4" - 12" AT.03


Upah :
Pekerja 0.284 hari 78,000.00 22,152.00
Tukang Bor 0.071 hari 93,000.00 6,603.00
Mandor 0.029 hari 103,000.00 2,945.80
Jumlah Tenaga Kerja 31,700.80
Peralatan :
Reaming ø 8 3/4" - 12" 0.500 m 10,000.00 5,000.00
Jumlah Alat 5,000.00

Jumlah,Harga, Dan Tenaga 36,700.80


Overhead + Profit 10% 3,670.08
Jumlah Total Upah 40,370.88

7 1 m' reaming ø 8 3/4" - 14 3/4" AT.04


Upah :
Pekerja 0.284 hari 78,000.00 22,152.00
Tukang Bor 0.072 hari 93,000.00 6,696.00
Mandor 0.029 hari 103,000.00 2,976.70
Jumlah Tenaga Kerja 31,824.70
Peralatan :
Reaming ø 8 3/4" - 14 3/4" 0.505 m 10,000.00 5,051.00
Jumlah Alat 5,051.00

Jumlah,Harga, Dan Tenaga 36,875.70


Overhead + Profit 10% 3,687.57
Jumlah Total Upah 40,563.27

8 Bongkar pasang temporary cassing (ID) 12" AT.05


Upah :
Pekerja 0.324 hari 78,000.00 25,272.00
Tukang Bor 0.081 hari 93,000.00 7,533.00
Mandor 0.033 hari 103,000.00 3,368.10
Jumlah Tenaga Kerja 36,173.10
Peralatan :
Temporary cassing (ID) 12" 0.571 m 15,000.00 8,571.00
Jumlah Alat 8,571.00

Jumlah,Harga, Dan Tenaga 44,744.10


Overhead + Profit 10% 4,474.41
Jumlah Total Upah 49,218.51

9 1 m' pengadaan dan pemasangan cassing pipa 8" PVC AW AT.09


Upah :
Pekerja 0.072 hari 78,000.00 5,616.00
Tukang Bor 0.018 hari 93,000.00 1,674.00
Mandor 0.007 hari 103,000.00 731.30
Jumlah Tenaga Kerja 8,021.30
Bahan :
Pipa PVC AW 8" 1.050 m 220,500.00 231,525.00
Centralizzer 0.100 ls 100,000.00 10,000.00
Jumlah Bahan 241,525.00
Peralatan :
Drilling Rig + Perlengkapan 0.143 Jam 100,000.00 14,290.00
Jumlah Alat 14,290.00

Jumlah,Harga, Dan Tenaga 263,836.30


Overhead + Profit 10% 26,383.63
Jumlah Total Upah 290,219.93

10 1 m' pengadaan dan pemasangan LC Screen 6" AT.10


Upah :
Pekerja 0.080 hari 78,000.00 6,240.00
Tukang Bor 0.020 hari 93,000.00 1,860.00
Mandor 0.008 hari 103,000.00 824.00
Jumlah Tenaga Kerja 8,924.00
Bahan :

41 of 84
PEKERJAAN HARGA
NO UPAH KODE VOLUME SAT SATUAN JUMLAH
BAHAN (Rp) (Rp)

LC Screen 6" 1.050 m 156,070.00 163,873.50


Jumlah Bahan 163,873.50
Peralatan :
Drilling Rig + Perlengkapan 0.143 Jam 100,000.00 14,290.00
Jumlah Alat 14,290.00

Jumlah,Harga, Dan Tenaga 187,087.50


Overhead + Profit 10% 18,708.75
Jumlah Total Upah 205,796.25

11 1 m3 pengadaan dan pemasangan gravel pack AT.12


Upah :
Pekerja 1.040 hari 78,000.00 81,120.00
Tukang Bor 0.260 hari 93,000.00 24,180.00
Mandor 0.104 hari 103,000.00 10,712.00
Jumlah Tenaga Kerja 116,012.00
Bahan :
Koral 1.000 m3 328,900.00 328,900.00
PC 85.000 Kg 1,200.00 102,000.00
Jumlah Bahan 430,900.00
Peralatan :
Drilling Rig + Perlengkapan 1.818 Jam 100,000.00 181,800.00
Jumlah Alat 181,800.00

Jumlah,Harga, Dan Tenaga 612,700.00


Overhead + Profit 10% 61,270.00
Jumlah Total Upah 673,970.00

12 1 jam Pencucian Sumur AT.13


Upah :
Pekerja 0.572 hari 78,000.00 44,616.00
Tukang Bor 0.143 hari 93,000.00 13,299.00
Mandor 0.057 hari 103,000.00 5,871.00
Jumlah Tenaga Kerja 63,786.00
Peralatan :
Drilling Rig + Perlengkapan 1.000 Jam 100,000.00 100,000.00
Jumlah Alat 100,000.00

Jumlah,Harga, Dan Tenaga 163,786.00


Overhead + Profit 10% 16,378.60
Jumlah Total Upah 180,164.60

13 1 jam Uji Pompa AT.14


Upah :
Pekerja 0.572 hari 78,000.00 44,616.00
Tukang Bor 0.143 hari 93,000.00 13,299.00
Mandor 0.057 hari 103,000.00 5,871.00
Jumlah Tenaga Kerja 63,786.00
Peralatan :
Drilling Rig + Perlengkapan 1.000 Jam 100,000.00 100,000.00
Jumlah Alat 100,000.00

Jumlah,Harga, Dan Tenaga 163,786.00


Overhead + Profit 10% 16,378.60
Jumlah Total Upah 180,164.60

14 1 lokasi pasang dan bongkar peralatan uji pemompaan AT.15


Upah :
Pekerja 8.000 hari 78,000.00 624,000.00
Tukang Bor 1.000 hari 93,000.00 93,000.00
Mandor 0.800 hari 103,000.00 82,400.00
Jumlah Tenaga Kerja 799,400.00
Bahan :
Resin 2.000 Tube 40,000.00 80,000.00
Lain - lain 1.000 Ls 20,000.00 20,000.00
Jumlah Bahan 100,000.00

Jumlah Bahan,Alat Dan Tenaga 899,400.00


Overhead + Profit 10% 89,940.00
Jumlah Total Upah 989,340.00

15 Borehole Logging SP dan Resistivity


Diperhitungkan Biaya Kedalaman Sumur 120 M Sebesar :
Upah :
Pekerja 1.650 hari 78,000.00 128,700.00
Tukang 0.250 hari 93,000.00 23,250.00
Kepala tukang 0.025 hari 98,000.00 2,450.00
Mandor 0.080 hari 103,000.00 8,240.00
Jumlah Tenaga Kerja 162,640.00
Alat :
Sewa alat Wireline Logging 1.000 unit 3,000,000.00 3,000,000.00
Alat bantu (kertas logging, tinta logging, baterai dll) 35.000 % 1,050,000.00 1,050,000.00
Jumlah Bahan 4,050,000.00

Jumlah Bahan,Alat Dan Tenaga 4,212,640.00


Overhead + Profit 10% 421,264.00
Jumlah Total Upah 4,633,904.00

Pengadaan dan Pemasangan Pipa Konstruksi


16 Pengadaan dan Pemasangan Pipa Jambang Diameter 8 inchi
Bahan :
Pipa PCV kelas AW dia. 8 inch 1.200 m1 220,500.00 264,600.00
Perlengkapan 35.000 % 220,500.00 77,175.00
Jumlah Bahan 341,775.00
Upah :
Pekerja 0.135 oh 78,000.00 10,530.00
Tukang 0.225 oh 93,000.00 20,925.00
Kepala Tukang 0.023 oh 98,000.00
Mandor 0.007 oh 103,000.00 700.40
Jumlah Tenaga Kerja 32,155.40

Peralatan :
Sewa Tripod/Tackel &handle Crane 2 T 0.012 Hari 75,000.00 900.00
Jumlah Alat 900.00

Jumlah Bahan,Alat Dan Tenaga 374,830.40


Overhead + Profit 10% 37,483.04
Jumlah Total Upah 412,313.44

17 Pengadaan dan Pemasangan Pipa Buta Diameter 8 inchi -


Bahan :
Pipa PCV kelas AW dia. 8 inch 1.200 m1 220,500.00 264,600.00
Perlengkapan 35.000 % 220,500.00 77,175.00
Jumlah Bahan 341,775.00
Upah :
Pekerja 0.135 oh 78,000.00 10,530.00
Tukang 0.225 oh 93,000.00 20,925.00
Kepala Tukang 0.023 98,000.00 2,205.00
Mandor 0.007 oh 103,000.00 700.40
Jumlah Tenaga Kerja 34,360.40

Jumlah Bahan,Alat Dan Tenaga 376,135.40


Overhead + Profit 10% 37,613.54
Jumlah Total Upah 413,748.94

42 of 84
PEKERJAAN HARGA
NO UPAH KODE VOLUME SAT SATUAN JUMLAH
BAHAN (Rp) (Rp)

18 Pengadaan dan Pemasangan Pipa Saringan Diameter 8 inchi -


Bahan :
Pipa PCV kelas AW dia. 8 inch 1.200 m1 220,500.00 264,600.00
Perlengkapan 35.000 % 220,500.00 77,175.00
Jumlah Bahan 341,775.00
Upah :
Pekerja 0.135 oh 78,000.00 10,530.00
Tukang 0.225 oh 93,000.00 20,925.00
Kepala Tukang 0.023 98,000.00 2,205.00
Mandor 0.007 oh 103,000.00 700.40
Jumlah Tenaga Kerja 34,360.40

Jumlah Bahan,Alat Dan Tenaga 376,135.40


Overhead + Profit 10% 37,613.54
Jumlah Total Upah 413,748.94

19 Pengadaan dan Pemasangan Pipa Konduktor 1.5 inchi -


Bahan :
Pipa PCV kelas AW dia. 1.5 inch 1.200 m1 17,750.00 21,300.00
Perlengkapan 35.000 % 33,775.00 11,821.25
Jumlah Bahan 33,121.25
Upah :
Pekerja 0.036 oh 78,000.00 2,808.00
Tukang 0.060 oh 93,000.00 5,580.00
Kepala Tukang 0.006 oh 98,000.00 588.00
Mandor 0.002 oh 103,000.00 185.40
Jumlah Tenaga Kerja 9,161.40

Jumlah Bahan,Alat Dan Tenaga 42,282.65


Overhead + Profit 10% 4,228.27
Jumlah Total Upah 46,510.92

20 Grouting Semen untuk Konstruksi Sumur dan well head -


Bahan :
Semen portland 218.000 kg 1,200.00 261,600.00
Pasir beton 0.520 m3 373,500.00 194,220.00
Koral beton 0.870 m3 200,400.00 174,348.00
Jumlah Bahan 368,568.00
Upah :
Pekerja 1.650 oh 78,000.00 128,700.00
Tukang 0.250 oh 93,000.00 23,250.00
Kepala tukang 0.025 oh 98,000.00 2,450.00
Mandor 0.080 oh 103,000.00 8,240.00
Jumlah Tenaga Kerja 33,940.00

Jumlah Bahan,Alat Dan Tenaga 402,508.00


Overhead + Profit 10% 40,250.80
Jumlah Total Upah 442,758.80

21 Pekerjaan Water Jetting selama 12 jam -


Bahan :
Biaya bahan bakar solar 55.000 liter 7,800.00 429,000.00
Biaya minyak pelumas olie 6.000 liter 10,300.00 61,800.00
Biaya sewa mudpump 1.000 hari 750,000.00 750,000.00
Alat bantu 35.000 % 375,000.00 131,250.00
Jumlah Bahan 881,250.00
Upah :
Pekerja 3.000 oh 78,000.00 234,000.00
Tukang 0.400 oh 93,000.00 37,200.00
Kepala tukang 1.500 oh 98,000.00 147,000.00
Mandor 0.150 oh 103,000.00 15,450.00
Jumlah Tenaga Kerja 199,650.00

Jumlah Bahan,Alat Dan Tenaga 1,080,900.00


Overhead + Profit 10% 108,090.00
Jumlah Total Upah 1,188,990.00

22 Pekerjaan Air Lift / Compressor Sumur


Bahan :
Biaya bahan bakar solar 90.000 liter 7,800.00 702,000.00
Biaya minyak pelumas olie 8.000 liter 10,300.00 82,400.00
Biaya sewa kompressor besar 6 - 12 bar 1.000 hari 1,750,000.00 1,750,000.00
Alat bantu 35.000 % 875,000.00 306,250.00
Jumlah Bahan 2,056,250.00
Upah :
Pekerja 4.000 oh 78,000.00 312,000.00
Tukang 0.400 oh 93,000.00 37,200.00
Kepala tukang 1.500 oh 98,000.00 147,000.00
Mandor 0.150 oh 103,000.00 15,450.00
Jumlah Tenaga Kerja 199,650.00

Jumlah Bahan,Alat Dan Tenaga 2,255,900.00


Overhead + Profit 10% 225,590.00
Jumlah Total Upah 2,481,490.00

3 Pekerjaan Galian Tanah biasa Sedalam 1 m T.06.a.1


Upah
Pekerja 0.563 oh 78,000.00 43,914.00
Mandor 0.056 oh 103,000.00 5,798.90
Jumlah Tenaga Kerja 49,712.90

Jumlah Bahan,Alat Dan Tenaga 49,712.90


Overhead + Profit 10% 4,971.29
Jumlah Total Upah 54,684.19

4 Pekerjaan Galian Tanah lumpur Sedalam 1 m T.10.a.1


Upah
Pekerja 0.830 oh 78,000.00 64,740.00
Mandor 0.083 oh 103,000.00 8,549.00
Jumlah Tenaga Kerja 73,289.00

Jumlah Bahan,Alat Dan Tenaga 73,289.00


Overhead + Profit 10% 7,328.90
Jumlah Total Upah 80,617.90

5 Mengangkut 1 m3 hasil galian dengan jarak angkut 50 m T.15.a.5


Upah
Pekerja 0.422 oh 78,000.00 32,916.00
Mandor 0.021 oh 103,000.00 2,173.30
Jumlah Tenaga Kerja 35,089.30

Jumlah Bahan,Alat Dan Tenaga 35,089.30


Overhead + Profit 10% 3,508.93
Jumlah Total Upah 38,598.23

6 1 m3 Urugan pasir dengan pasir urug T.14.c


Bahan
Pasir urug 1.200 m3 94,900.00 113,880.00
Jumlah Bahan 113,880.00
Upah
Pekerja 0.400 oh 78,000.00 31,200.00
Mandor 0.040 oh 103,000.00 4,120.00

43 of 84
PEKERJAAN HARGA
NO UPAH KODE VOLUME SAT SATUAN JUMLAH
BAHAN (Rp) (Rp)

Jumlah Tenaga Kerja 35,320.00

Jumlah Bahan,Alat Dan Tenaga 149,200.00


Overhead + Profit 10% 14,920.00
Jumlah Total Upah 164,120.00

7 1 m3 Urugan sirtu T.14.c


Bahan
Sirtu urug 1.200 m3 99,850.00 119,820.00
Jumlah Bahan 119,820.00
Upah
Pekerja 0.400 oh 78,000.00 31,200.00
Mandor 0.040 oh 103,000.00 4,120.00
Jumlah Tenaga Kerja 35,320.00

Jumlah Bahan,Alat Dan Tenaga 155,140.00


Overhead + Profit 10% 15,514.00
Jumlah Total Upah 170,654.00

8 1 m3 Urugan kembali T.14.a.


Upah
Pekerja 0.330 oh 78,000.00 25,740.00
Mandor 0.033 oh 103,000.00 3,399.00
Jumlah Tenaga Kerja 29,139.00

Jumlah Bahan,Alat Dan Tenaga 29,139.00


Overhead + Profit 10% 2,913.90
Jumlah Total Upah 32,052.90

9 1 m3 Pemadatan Tanah T.14.b1


Upah
Pekerja 0.500 oh 78,000.00 39,000.00
Mandor 0.050 oh 103,000.00 5,150.00
Jumlah Tenaga Kerja 44,150.00
Alat
Stamper 0.050 Hari
Jumlah Tenaga Kerja 44,150.00
Jumlah Bahan,Alat Dan Tenaga 44,150.00
Overhead + Profit 10% 4,415.00
Jumlah Total Upah 48,565.00

10 1 m3 Membuat lantai kerja beton mutu f'c=1,8 s.d 3,7 (B0: K40 s.d K60) B.01.a
Bahan
Semen portland 200.00 Kg Rp 1,200.00 240,000.00
Pasir beton 0.52 m3 Rp 373,500.00 194,967.00
Koral beton 0.86 m3 Rp 200,400.00 172,744.80
Jumlah Bahan 607,711.80
Upah
Pekerja 1.320 oh Rp 78,000.00 102,960.00
Tukang batu 0.220 oh Rp 93,000.00 20,460.00
Kepala tukang 0.022 oh Rp 98,000.00 2,156.00
Mandor 0.132 oh Rp 103,000.00 13,596.00
Jumlah Tenaga Kerja 139,172.00

Jumlah Bahan,Alat Dan Tenaga 746,883.80


Overhead + Profit 10% 74,688.38
Jumlah Total Upah 821,572.18

11 Membuat 1 M3 beton mutu f'c=7,4 Mpa (K100), slump (12±2) cm / W/c = 0,87. B.02.b
Bahan
Semen portland 247.000 Kg Rp 1,200.00 296,400.00
Pasir beton 0.621 m3 Rp 373,500.00 231,943.50
Koral beton 0.740 m3 Rp 200,400.00 148,296.00
Air 215.000 Ltr Rp 300.00 64,500.00
Jumlah Bahan 741,139.50
Upah
Pekerja 1.323 oh Rp 78,000.00 103,194.00
Tukang batu 0.189 oh Rp 93,000.00 17,577.00
Kepala tukang 0.019 oh Rp 98,000.00 1,862.00
Mandor 0.132 oh Rp 103,000.00 13,596.00
Jumlah Tenaga Kerja 136,229.00
Peralatan
Molen 0.250 Hari 140,000.00 35,000.00
Jumlah Alat 35,000.00

Jumlah Bahan,Alat Dan Tenaga 912,368.50


Overhead + Profit 10% 91,236.85
Jumlah Total Upah 1,003,605.35

12 Membuat 1 M3 beton mutu f'c=14,5 Mpa (K175), slump (12±2) cm / W/c = 0,66. B.05.b
Bahan
Semen portland 326.000 Kg Rp 1,200.00 391,200.00
Pasir beton 0.543 m3 Rp 373,500.00 202,757.14
Koral beton 0.762 m3 Rp 200,400.00 152,749.33
Air 215.000 Ltr Rp 300.00 64,500.00
Jumlah Bahan 811,206.48
Upah
Pekerja 1.650 oh Rp 78,000.00 128,700.00
Tukang batu 0.275 oh Rp 93,000.00 25,575.00
Kepala tukang 0.028 oh Rp 98,000.00 2,744.00
Mandor 0.165 oh Rp 103,000.00 16,995.00
Jumlah Tenaga Kerja 174,014.00
Peralatan
Molen 0.250 Hari 140,000.00 35,000.00
Jumlah Alat 35,000.00

Jumlah Bahan,Alat Dan Tenaga 1,020,220.48


Overhead + Profit 10% 102,022.05
Jumlah Total Upah 1,122,242.52

13 Membuat 1 M3 beton mutu f'c=19,3 Mpa (K225), slump (12±2)cm / W/c = 0,58. B.07.b
Bahan
Semen portland 371.000 Kg Rp 1,200.00 445,200.00
Pasir beton 0.499 m3 Rp 373,500.00 186,216.43
Koral beton 0.776 m3 Rp 200,400.00 155,421.33
Air 215.000 Ltr Rp 300.00 64,500.00
Jumlah Bahan 851,337.76
Upah
Pekerja 1.650 oh Rp 78,000.00 128,700.00
Tukang batu 0.275 oh Rp 93,000.00 25,575.00
Kepala tukang 0.028 oh Rp 98,000.00 2,744.00
Mandor 0.165 oh Rp 103,000.00 16,995.00
Jumlah Tenaga Kerja 174,014.00
Peralatan
Molen 0.250 Hari 140,000.00 35,000.00
Jumlah Alat 35,000.00

Jumlah Bahan,Alat Dan Tenaga 1,060,351.76


Overhead + Profit 10% 106,035.18
Jumlah Total Upah 1,166,386.94

14 Membuat 1 M3 beton mutu f'c=26,4 Mpa (K300), slump (12±2) cm / W/c = 0,58. B.10.b

44 of 84
PEKERJAAN HARGA
NO UPAH KODE VOLUME SAT SATUAN JUMLAH
BAHAN (Rp) (Rp)

Bahan
Semen portland 413.000 Kg Rp 1,200.00 495,600.00
Pasir beton 0.486 m3 Rp 373,500.00 181,681.07
Koral beton 0.567 m3 Rp 200,400.00 113,671.33
Air 215.000 Ltr Rp 300.00 64,500.00
Jumlah Bahan 855,452.40
Upah
Pekerja 1.650 oh Rp 78,000.00 128,700.00
Tukang batu 0.275 oh Rp 93,000.00 25,575.00
Kepala tukang 0.028 oh Rp 98,000.00 2,744.00
Mandor 0.165 oh Rp 103,000.00 16,995.00
Jumlah Tenaga Kerja 174,014.00
Peralatan
Molen 0.250 Hari 140,000.00 35,000.00
Jumlah Alat 35,000.00

Jumlah Bahan,Alat Dan Tenaga 1,064,466.40


Overhead + Profit 10% 106,446.64
Jumlah Total Upah 1,170,913.05

15 1 m’ pasangan water stop PVC lebar 200 mm B.30.b


Bahan
Water stop PVC 200 mm 1.050 m' Rp 82,500.00 86,625.00
Kawat ikat beton 0.010 kg Rp 13,110.00 131.10
Jumlah Bahan 86,756.10
Upah
Pekerja 0.070 oh Rp 78,000.00 5,460.00
Tukang batu 0.035 oh Rp 93,000.00 3,255.00
Kepala tukang 0.004 oh Rp 98,000.00 343.00
Mandor 0.007 oh Rp 103,000.00 721.00
Jumlah Tenaga Kerja 9,779.00
Peralatan

Jumlah Alat -

Jumlah Bahan,Alat Dan Tenaga 96,535.10


Overhead + Profit 10% 9,653.51
Jumlah Total Upah 106,188.61

16 10 Kg Pembesian dengan besi polos A.4.1.1.17


Bahan
Besi beton polos 10.500 Kg Rp 9,880.00 103,740.00
Kawat beton 0.150 Kg Rp 13,110.00 1,966.50
Jumlah Bahan 103,740.00
Upah
Pekerja 0.070 oh Rp 78,000.00 5,460.00
Tukang besi 0.070 oh Rp 93,000.00 6,510.00
Kepala tukang 0.0070 oh Rp 98,000.00 686.00
Mandor 0.0040 oh Rp 103,000.00 412.00
Jumlah Tenaga Kerja 13,068.00

Jumlah Bahan,Alat Dan Tenaga 116,808.00


Overhead + Profit 10% 11,680.80
Jumlah Total Upah 128,488.80

17 1 m2 Pasang bekisting multiplek 12 mm untuk fondasi dan sloof (3 kali pakai) B.26a
Bahan
Multiplek 12 mm 0.128 lbr Rp 190,000.00 24,320.00
Kaso 5/7 0.009 m3 Rp 3,596,790.00 32,371.11
Paku 7 mm 0.250 Kg Rp 16,900.00 4,225.00
Minyak Bekisting 0.200 Ltr Rp 5,640.00 1,128.00
Jumlah Bahan 56,691.11
Upah
Pekerja 0.200 oh Rp 78,000.00 15,600.00
Tukang kayu 0.100 oh Rp 93,000.00 9,300.00
Kepala tukang 0.010 oh Rp 98,000.00 980.00
Mandor 0.020 oh Rp 103,000.00 2,060.00
Jumlah Tenaga Kerja 27,940.00

Jumlah Bahan,Alat Dan Tenaga 84,631.11


Overhead + Profit 10% 8,463.11
Jumlah Total Upah 93,094.22

18 1 m2 Pasang bekisting multiplek 12 mm untuk lantai (3 kali pakai) B.21b


Bahan
Multiplek 12 mm 0.128 lbr Rp 190,000.00 24,320.00
Kaso 5/7 0.005 m3 Rp 3,596,790.00 17,983.95
Paku 7 mm 0.220 Kg Rp 16,900.00 3,718.00
Minyak Bekisting 0.200 Ltr Rp 5,640.00 1,128.00
Jumlah Bahan 47,149.95
Upah
Pekerja 0.200 oh Rp 78,000.00 15,600.00
Tukang kayu 0.100 oh Rp 93,000.00 9,300.00
Kepala tukang 0.010 oh Rp 98,000.00 980.00
Mandor 0.020 oh Rp 103,000.00 2,060.00
Jumlah Tenaga Kerja 27,940.00

Jumlah Bahan,Alat Dan Tenaga 75,089.95


Overhead + Profit 10% 7,509.00
Jumlah Total Upah 82,598.95

19 1 m2 Pasang bekisting multiplek 12 mm untuk kolom (3 kali pakai) B.24b


Bahan
Multiplek 12 mm 0.128 lbr Rp 190,000.00 24,320.00
Kaso 5/7 0.006 m3 Rp 3,596,790.00 21,580.74
Paku 7 mm 0.250 Kg Rp 16,900.00 4,225.00
Minyak Bekisting 0.200 Ltr Rp 5,640.00 1,128.00
Jumlah Bahan 51,253.74
Upah
Pekerja 0.220 Oh Rp 78,000.00 17,160.00
Tukang kayu 0.110 Oh Rp 93,000.00 10,230.00
Kepala tukang 0.011 Oh Rp 98,000.00 1,078.00
Mandor 0.022 Oh Rp 103,000.00 2,266.00
Jumlah Tenaga Kerja 30,734.00

Jumlah Bahan,Alat Dan Tenaga 81,987.74


Overhead + Profit 10% 8,198.77
Jumlah Total Upah 90,186.51

20 1 m2 Pasang bekisting multiplek 12 mm untuk balok (3 kali pakai) B.23 b


Bahan
Multiplek 12 mm 0.128 lbr Rp 190,000.00 24,320.00
Kaso 5/7 0.005 m3 Rp 3,596,790.00 17,983.95
Paku 7 mm 0.220 Kg Rp 16,900.00 3,718.00
Minyak Bekisting 0.200 Ltr Rp 5,640.00 1,128.00
Jumlah Bahan 47,149.95
Upah
Pekerja 0.240 Oh Rp 78,000.00 18,720.00
Tukang kayu 0.120 Oh Rp 93,000.00 11,160.00
Kepala tukang 0.012 Oh Rp 98,000.00 1,176.00
Mandor 0.024 Oh Rp 103,000.00 2,472.00
Jumlah Tenaga Kerja 33,528.00

Jumlah Bahan,Alat Dan Tenaga 80,677.95


Overhead + Profit 10% 8,067.80
45 of 84
PEKERJAAN HARGA
NO UPAH KODE VOLUME SAT SATUAN JUMLAH
BAHAN (Rp) (Rp)

Jumlah Total Upah 88,745.75

21 1 m2 Bekisting dinding beton biasa dengan multiflex 12 mm (3 kali Pakai) B.25.b


Bahan
Multiplek 12 mm 0.128 lbr Rp 190,000.00 24,320.00
Kaso 5/7 0.005 m3 Rp 3,596,790.00 17,983.95
Paku 7 mm 0.240 Kg Rp 16,900.00 4,056.00
Minyak Bekisting 0.200 Ltr Rp 5,640.00 1,128.00
Jumlah Bahan 47,487.95
Upah
Pekerja 0.240 Oh Rp 78,000.00 18,720.00
Tukang kayu 0.120 Oh Rp 93,000.00 11,160.00
Kepala tukang 0.012 Oh Rp 98,000.00 1,176.00
Mandor 0.024 Oh Rp 103,000.00 2,472.00
Jumlah Tenaga Kerja 33,528.00

Jumlah Bahan,Alat Dan Tenaga 81,015.95


Overhead + Profit 10% 8,101.60
Jumlah Total Upah 89,117.55

1 m2 perancah bekisting lantai menggunakan bamboo Ø 8-10 ,tinggi 4 m dan JAT ≤ 0.8 m
22 B.21.f
Bahan
Bamboo Ø 8-10 p=4m 1.800 btng Rp 17,340.00 31,212.00
Paku 7 cm 0.300 Kg Rp 16,900.00 5,070.00
Tambang ijuk atau plastik 3.500 m Rp 5,000.00 17,500.00
Jumlah Bahan 53,782.00
Upah
Pekerja 0.320 Oh Rp 78,000.00 24,960.00
Tukang kayu 0.160 Oh Rp 93,000.00 14,880.00
Kepala tukang 0.016 Oh Rp 98,000.00 1,568.00
Mandor 0.032 Oh Rp 103,000.00 3,296.00
Jumlah Tenaga Kerja 44,704.00

Jumlah Bahan,Alat Dan Tenaga 98,486.00


Overhead + Profit 10% 9,848.60
Jumlah Total Upah 108,334.60

1 m2 perancah bekisting balok menggunakan bamboo Ø 8-10 ,tinggi 4 m dan JAT < 1,0 m
23 B.23.f
Bahan
Bamboo Ø 8-10 p=4m 1.000 btng Rp 17,340.00 17,340.00
Paku 7 cm 0.280 Kg Rp 16,900.00 4,732.00
Tambang ijuk atau plastik 3.500 m Rp 5,000.00 17,500.00
Jumlah Bahan 39,572.00
Upah
Pekerja 0.380 Oh Rp 78,000.00 29,640.00
Tukang kayu 0.190 Oh Rp 93,000.00 17,670.00
Kepala tukang 0.019 Oh Rp 98,000.00 1,862.00
Mandor 0.038 Oh Rp 103,000.00 3,914.00
Jumlah Tenaga Kerja 53,086.00

Jumlah Bahan,Alat Dan Tenaga 92,658.00


Overhead + Profit 10% 9,265.80
Jumlah Total Upah 101,923.80

1 m2 perancah bekisting kolom menggunakan bamboo Ø 8-10 ,tinggi 4 m dan JAT < 1,0 m
24 B.24.f
Bahan
Bamboo Ø 8-10 p=4m 0.920 btng Rp 17,340.00 15,952.80
Paku 7 cm 0.240 Kg Rp 16,900.00 4,056.00
Tambang ijuk atau plastik 3.500 m Rp 5,000.00 17,500.00
Jumlah Bahan 37,508.80
Upah
Pekerja 0.360 Oh Rp 78,000.00 28,080.00
Tukang kayu 0.180 Oh Rp 93,000.00 16,740.00
Kepala tukang 0.018 Oh Rp 98,000.00 1,764.00
Mandor 0.036 Oh Rp 103,000.00 3,708.00
Jumlah Tenaga Kerja 50,292.00

Jumlah Bahan,Alat Dan Tenaga 87,800.80


Overhead + Profit 10% 8,780.08
Jumlah Total Upah 96,580.88

25 1 m2 perancah bekisting dinding menggunakan kayu 5/7 ,tinggi maks 2.5 m B.25.d
Bahan
Kaso 5/7 0.010 m3 Rp 17,340.00 173.40
Paku 7 cm 0.240 Kg Rp 16,900.00 4,056.00
Jumlah Bahan 4,229.40
Upah
Pekerja 0.360 Oh Rp 78,000.00 28,080.00
Tukang kayu 0.180 Oh Rp 93,000.00 16,740.00
Kepala tukang 0.018 Oh Rp 98,000.00 1,764.00
Mandor 0.036 Oh Rp 103,000.00 3,708.00
Jumlah Tenaga Kerja 50,292.00

Jumlah Bahan,Alat Dan Tenaga 54,521.40


Overhead + Profit 10% 5,452.14
Jumlah Total Upah 59,973.54
26 Membuat 1 m’ kolom praktis beton bertulang (11 x 11) cm A.4.4.1.35
Bahan
Kayu Kelas III 0.002 m3 Rp 2,800,000.00 5,600.00
Paku 7 mm 0.010 Kg Rp 16,900.00 169.00
Minyak Bekisting Ltr Rp 5,640.00 -
Besi beton polos 3.000 Kg Rp 9,880.00 29,640.00
Kawat beton 0.450 Kg Rp 13,110.00 5,899.50
Semen portland 4.000 Kg Rp 1,200.00 4,800.00
Pasir beton 0.006 m3 Rp 373,500.00 2,241.00
Koral beton 0.009 m3 Rp 200,400.00 1,803.60

Jumlah Bahan 50,153.10


Upah
Pekerja 0.180 Oh Rp 78,000.00 14,040.00
Tukang batu 0.020 Oh Rp 93,000.00 1,860.00
Tukang kayu 0.020 Oh Rp 93,000.00 1,860.00
Tukang besi 0.020 Oh Rp 93,000.00 1,860.00
Kepala tukang 0.006 Oh Rp 98,000.00 588.00
Mandor 0.009 Oh Rp 103,000.00 927.00
Jumlah Tenaga Kerja 21,135.00

Jumlah Bahan,Alat Dan Tenaga 71,288.10


Overhead + Profit 10% 7,128.81
Jumlah Total Upah 78,416.91

27 Pemasangan 1 m2 Dinding Bata Putih Tebal 1/2 Bata 1pc:2pp A.4.4.1.9


Bahan
Bata putih 45.000 Bh Rp 1,100.00 49,500.00
PC 14.370 kg Rp 1,200.00 17,244.00
Pasir Pasang 0.040 m3 Rp 311,000.00 12,440.00
Jumlah Bahan 79,184.00
Upah
Pekerja 0.300 Oh Rp 78,000.00 23,400.00
Tukang batu 0.100 Oh Rp 93,000.00 9,300.00
Kepala tukang 0.010 Oh Rp 98,000.00 980.00

46 of 84
PEKERJAAN HARGA
NO UPAH KODE VOLUME SAT SATUAN JUMLAH
BAHAN (Rp) (Rp)

Mandor 0.015 Oh Rp 103,000.00 1,545.00


Jumlah Tenaga Kerja 35,225.00

Jumlah Bahan,Alat Dan Tenaga 114,409.00


Overhead + Profit 10% 11,440.90
Jumlah Total Upah 125,849.90

26 1 m3 Pasang pondasi batu kosong (Aanstamping) P.05


Bahan
Batu belah ( 15/20 ) 1.200 m3 Rp 157,450.00 188,940.00
Pasir urug 0.432 m3 Rp 94,900.00 40,996.80
Jumlah Bahan 229,936.80
Upah
Pekerja 1.000 Oh Rp 78,000.00 78,000.00
Tukang batu 0.500 Oh Rp 93,000.00 46,500.00
Kepala tukang 0.050 Oh Rp 98,000.00 4,900.00
Mandor 0.100 Oh Rp 103,000.00 10,300.00
Jumlah Tenaga Kerja 139,700.00

Jumlah Bahan,Alat Dan Tenaga 369,636.80


Overhead + Profit 10% 36,963.68
Jumlah Total Upah 406,600.48

27 1 m3 Pasang pondasi batu kali 1 Pc : 3 Ps P.01.b


Bahan
Batu belah ( 15/20 ) 1.200 m3 Rp 157,450.00 188,940.00
Semen porland 202.000 Kg Rp 1,200.00 242,400.00
Pasir pasang 0.485 m3 Rp 311,000.00 150,835.00
Jumlah Bahan 582,175.00
Upah
Pekerja 2.700 Oh Rp 78,000.00 210,600.00
Tukang batu 0.900 Oh Rp 93,000.00 83,700.00
Mandor 0.270 Oh Rp 103,000.00 27,810.00
Jumlah Tenaga Kerja 322,110.00

Jumlah Bahan,Alat Dan Tenaga 904,285.00


Overhead + Profit 10% 90,428.50
Jumlah Total Upah 994,713.50

28 1 m3 Pasang pondasi batu kali 1 Pc : 4 Ps P.01.c


Bahan
Batu belah ( 15/20 ) 1.200 m3 Rp 157,450.00 188,940.00
Semen porland 163.000 Kg Rp 1,200.00 195,600.00
Pasir pasang 0.520 m3 Rp 311,000.00 161,720.00
Jumlah Bahan 546,260.00
Upah
Pekerja 2.700 Oh Rp 78,000.00 210,600.00
Tukang batu 0.900 Oh Rp 93,000.00 83,700.00
Mandor 0.270 Oh Rp 103,000.00 27,810.00
Jumlah Tenaga Kerja 322,110.00

Jumlah Bahan,Alat Dan Tenaga 868,370.00


Overhead + Profit 10% 86,837.00
Jumlah Total Upah 955,207.00

29 1 m2 Pemasangan Glasbox uk.20/20 cm


Bahan
Glassbox Kaca 20x20 25.000 Bh Rp 20,440.00 511,000.00
PC 11.000 kg Rp 1,200.00 13,200.00
Pasir Pasang 0.035 m3 Rp 311,000.00 10,885.00
Jumlah Bahan 535,085.00
Upah
Pekerja 0.300 Oh Rp 78,000.00 23,400.00
Tukang batu 0.100 Oh Rp 93,000.00 9,300.00
Kepala tukang 0.010 Oh Rp 98,000.00 980.00
Mandor 0.015 Oh Rp 103,000.00 1,545.00
Jumlah Tenaga Kerja 35,225.00

Jumlah Bahan,Alat Dan Tenaga 570,310.00


Overhead + Profit 10% 57,031.00
Jumlah Total Upah 627,341.00

30 1 m2 Siaran 1 PC : 2 PP P.03.a
Bahan
Pasir Pasang 0.012 m3 Rp 311,000.00 3,732.00
Portland Cement 6.340 Kg Rp 1,200.00 7,608.00
0.485 11,340.00
Upah
Pekerja 0.300 Oh Rp 78,000.00 23,400.00
Tukang Batu 0.150 Oh Rp 93,000.00 13,950.00
Kepala Tukang 0.015 Oh Rp 98,000.00 1,470.00
Mandor 0.030 Oh Rp 103,000.00 3,090.00
0.27 41,910.00

Jumlah Bahan,Alat Dan Tenaga 53,250.00


Overhead + Profit 10% 5,325.00
Jumlah Total Upah 58,575.00

31 1 m2 Plesteran t. 1 cm 1 PC : 4 PP P.04.c
Bahan
Pasir Pasang 0.018 m3 Rp 311,000.00 5,598.00
Portland Cement 4.450 Kg Rp 1,200.00 5,340.00
Jumlah Bahan 10,938.00
Upah
Pekerja 0.300 Oh Rp 78,000.00 23,400.00
Tukang Batu 0.150 Oh Rp 93,000.00 13,950.00
Kepala Tukang 0.015 Oh Rp 98,000.00 1,470.00
Mandor 0.030 Oh Rp 103,000.00 3,090.00
Jumlah Tenaga Kerja 41,910.00

Jumlah Bahan,Alat Dan Tenaga 52,848.00


Overhead + Profit 10% 5,284.80
Jumlah Total Upah 58,132.80

32 1 Kg Pemasangan besi profil A.4.2.1.1


Bahan (AHSP 2013)
Besi Profil 1.150 Kg Rp 12,930.00 14,869.50

Jumlah Bahan 14,869.50


Upah
Pekerja 0.060 Oh Rp 78,000.00 4,680.00
Tukang Las 0.060 Oh Rp 93,000.00 5,580.00
Kepala Tukang 0.006 Oh Rp 98,000.00 588.00
Mandor 0.003 Oh Rp 103,000.00 309.00
Jumlah Tenaga Kerja 10,848.00

Jumlah Bahan,Alat Dan Tenaga 25,717.50


Overhead + Profit 10% 2,571.75
Jumlah Total Upah 28,289.25

33 1 Kg Pemasangan Rangka Kuda-Kuda Baja IWF A.4.2.1.2


Bahan (AHSP 2013)
Besi Profil WF 1.150 Kg Rp 12,930.00 14,869.50

Jumlah Bahan 14,869.50


Upah

47 of 84
PEKERJAAN HARGA
NO UPAH KODE VOLUME SAT SATUAN JUMLAH
BAHAN (Rp) (Rp)

Pekerja 0.060 Oh Rp 78,000.00 4,680.00


Tukang Las 0.060 Oh Rp 93,000.00 5,580.00
Kepala Tukang 0.006 Oh Rp 98,000.00 588.00
Mandor 0.003 Oh Rp 103,000.00 309.00
Jumlah Tenaga Kerja 10,848.00

Jumlah Bahan,Alat Dan Tenaga 25,717.50


Overhead + Profit 10% 2,571.75
Jumlah Total Upah 28,289.25

34 100 Kg Pekerjaan Perakitan A.4.2.1.3


Bahan (AHSP 2013)
Solar 1.000 lt Rp 7,800.00 7,800.00
Minyak pelumas 0.100 lt Rp 10,300.00 1,030.00
Jumlah Bahan 8,830.00
Upah
Pekerja 0.100 Oh Rp 78,000.00 7,800.00
Tukang Besi 0.100 Oh Rp 93,000.00 9,300.00
Kepala Tukang 0.001 Oh Rp 98,000.00 98.00
Mandor 0.005 Oh Rp 103,000.00 515.00
Jumlah Tenaga Kerja 17,198.00
Peralatan :
Sewa Welding set (max 8 jam) 0.800 Jam Rp 65,000.00 52,000.00

Jumlah Peralatan 69,198.00

Jumlah Bahan,Alat Dan Tenaga 95,226.00


Overhead + Profit 10% 9,522.60
Jumlah Total Upah 104,748.60

35 1 m2 pintu besi plat baja tebal 3 mm rangkap, rangka baja siku A.4.2.1.4
(AHSP 2013)
Bahan
Besi siku L 15.000 Kg 12,930.00 193,950.00
Besi plat baja 32.800 Kg 14,900.00 488,720.00
Kawat las 0.050 Kg 75,000.00 3,750.00
Jumlah Bahan 686,420.00
Upah
Pekerja 1.050 oh 78,000.00 81,900.00
Tukang las 1.050 oh 93,000.00 97,650.00
Kepala tukang 0.105 oh 98,000.00 10,290.00
Mandor 0.052 oh 103,000.00 5,356.00
Jumlah Tenaga Kerja 195,196.00

Jumlah Bahan,Alat Dan Tenaga 881,616.00


Overhead + Profit 10% 88,161.60
Jumlah Total Upah 969,777.60

36 Pengerjaan 10 cm pengelasan dengan las listrik A.4.2.1.5


Bahan (AHSP 2013)
Kawat Las 0.400 kg Rp 75,000.00 30,000.00
Solar 0.300 lt Rp 7,800.00 2,340.00
Minyak pelumas 0.040 lt Rp 10,300.00 412.00
Jumlah Bahan 32,752.00
Upah
Pekerja 0.040 Oh Rp 78,000.00 3,120.00
Tukang Besi 0.020 Oh Rp 93,000.00 1,860.00
Kepala Tukang 0.002 Oh Rp 98,000.00 196.00
Mandor 0.002 Oh Rp 103,000.00 206.00
Jumlah Tenaga Kerja 5,176.00
Peralatan :
Sewa Welding set (max 8 jam) 0.170 Jam Rp 65,000.00 11,050.00

Jumlah Peralatan 16,226.00

Jumlah Bahan,Alat Dan Tenaga 54,154.00


Overhead + Profit 10% 5,415.40
Jumlah Total Upah 59,569.40

37 1 m2 Pemasangan Pagar BRC

Bahan
Pagar BRC T = 1,50 m 1.000 m2 425,333.33 425,333.33
PC 25.000 kg 1,200.00 30,000.00
Pasir Pasang 0.050 m3 311,000.00 15,550.00
Jumlah Bahan 470,883.33
Upah
Pekerja 0.306 oh 78,000.00 23,836.80
Tukang cat 0.306 oh 93,000.00 28,420.80
Kepala tukang 0.031 oh 98,000.00 2,998.80
Mandor 0.003 oh 103,000.00 319.30
Jumlah Tenaga Kerja 55,575.70

Jumlah Bahan,Alat Dan Tenaga 526,459.03


Overhead + Profit 10% 52,645.90
Jumlah Total Upah 579,104.94

38 1 m2 Pengecatan Tembok Baru A.4.7.1.10

Bahan
Plamuur 0.100 kg 45,520.00 4,552.00
Cat dasar 0.100 kg 23,860.00 2,386.00
Cat penutup 0.260 kg 23,860.00 6,203.60
Jumlah Bahan 13,141.60
Upah
Pekerja 0.020 oh 78,000.00 1,560.00
Tukang cat 0.063 oh 93,000.00 5,859.00
Kepala tukang 0.006 oh 98,000.00 617.40
Mandor 0.003 oh 103,000.00 257.50
Jumlah Tenaga Kerja 8,293.90

Jumlah Bahan,Alat Dan Tenaga 21,435.50


Overhead + Profit 10% 2,143.55
Jumlah Total Upah 23,579.05

39 1 m2 Pengecatan permukaan baja dengan cat besi A.4.7.1.16

Bahan
Meni besi 0.100 kg 71,428.57 7,142.86
Kuas 0.010 bh 32,200.00 322.00
Jumlah Bahan 7,464.86
Upah
Pekerja 0.020 oh 78,000.00 1,560.00
Tukang cat 0.200 oh 93,000.00 18,600.00
Kepala tukang 0.020 oh 98,000.00 1,960.00
Mandor 0.003 oh 103,000.00 257.50
Jumlah Tenaga Kerja 22,377.50

Jumlah Bahan,Alat Dan Tenaga 29,842.36


Overhead + Profit 10% 2,984.24
Jumlah Total Upah 32,826.59

40 1M2 Pekerjaan Cat Waterproofing Pendekatan

Bahan
Pasir Hitam / Jawa 0.04 m3 373,500.00 14,940.00

48 of 84
PEKERJAAN HARGA
NO UPAH KODE VOLUME SAT SATUAN JUMLAH
BAHAN (Rp) (Rp)

Semen Pc 17.850 kg 1,200.00 21,420.00


Cat Waterproofing 0.500 Kg 54,500.00 27,250.00
Jumlah Bahan 63,610.00
Upah
Pekerja 0.024 oh 78,000.00 1,872.00
Tukang cat 0.210 oh 93,000.00 19,530.00
Kepala tukang 0.020 oh 98,000.00 1,960.00
Mandor 0.010 oh 103,000.00 1,030.00
Jumlah Tenaga Kerja 24,392.00

Jumlah Bahan,Alat Dan Tenaga 88,002.00


Overhead + Profit 10% 8,800.20
Jumlah Total Upah 96,802.20
41 1 m1 Pemasangan Pipa PVC tipe AW Ø 1/2" A.5.1.1 25
Bahan
Pipa PVC Ø 1/2" 1.200 m 6,000.00 7,200.00
Perlengkapan 35.000 % 2,100.00 2,100.00
Jumlah Bahan 9,300.00
Upah
Pekerja 0.036 oh 78,000.00 2,808.00
Tukang Pipa 0.060 oh 93,000.00 5,580.00
Kepala Tukang 0.006 oh 98,000.00 588.00
Mandor 0.002 oh 103,000.00 206.00
Jumlah Tenaga Kerja 9,182.00
Alat :

Jumlah Bahan,Alat Dan Tenaga 18,482.00


Overhead + Profit 10% 1,848.20
Jumlah Total Upah 20,330.20
42 1 m1 Pemasangan Pipa PVC tipe AW Ø 1" A.5.1.1 27
Bahan
Pipa PVC Ø 1" 1.200 m 12,300.00 14,760.00
Perlengkapan 35.000 % 4,305.00 4,305.00
Jumlah Bahan 19,065.00
Upah
Pekerja 0.036 oh 78,000.00 2,808.00
Tukang Pipa 0.060 oh 93,000.00 5,580.00
Kepala Tukang 0.006 oh 98,000.00 588.00
Mandor 0.002 oh 103,000.00 206.00
Jumlah Tenaga Kerja 9,182.00
Alat :

Jumlah Bahan,Alat Dan Tenaga 28,247.00


Overhead + Profit 10% 2,824.70
Jumlah Total Upah 31,071.70

43 1 m1 Pemasangan Pipa PVC Ø 2" RRJ S 12.5 A.8.4.1


Bahan
Pipa PVC AW Ø 2" RRJ S 12.5 1.000 m 31,700.00 31,700.00
Jumlah Bahan 31,700.00
Upah
Pekerja 0.081 oh 78,000.00 6,318.00
Tukang Pipa 0.041 oh 93,000.00 3,813.00
Mandor 0.008 oh 103,000.00 824.00
Jumlah Tenaga Kerja 10,955.00
Peralatan
Sewa Tripot/Tackel& handle crane 2 T 0.006 Hari 75,000.00 450.00
Jumlah Peralatan 450.00

Jumlah Bahan,Alat Dan Tenaga 43,105.00


Overhead + Profit 10% 4,310.50
Jumlah Total Upah 47,415.50

44 1 m1 Pemasangan Pipa PVC Ø 3" A.8.4.1.2


Bahan
Pipa PVC Ø 3" 1.000 m 26,300.00 26,300.00
Jumlah Bahan 26,300.00
Upah
Pekerja 0.094 oh 78,000.00 7,332.00
Tukang Pipa 0.047 oh 93,000.00 4,371.00
Mandor 0.009 oh 103,000.00 927.00
Jumlah Tenaga Kerja 12,630.00
Peralatan
Sewa Tripot/Tackel& handle crane 2 T 0.008 Hari 75,000.00 600.00
Jumlah Peralatan 600.00

Jumlah Bahan,Alat Dan Tenaga 39,530.00


Overhead + Profit 10% 3,953.00
Jumlah Total Upah 43,483.00

45 1 m1 Pemasangan Pipa PVC Ø 4" A.8.4.1.3


Bahan
Pipa PVC Ø 4" 1.000 m 36,690.00 36,690.00
Jumlah Bahan 36,690.00
Upah
Pekerja 0.105 oh 78,000.00 8,190.00
Tukang Pipa 0.053 oh 93,000.00 4,929.00
Mandor 0.011 oh 103,000.00 1,133.00
Jumlah Tenaga Kerja 14,252.00
Peralatan
Sewa Tripot/Tackel& handle crane 2 T 0.01 Hari 75,000.00 750.00
Jumlah Peralatan 750.00

Jumlah Bahan,Alat Dan Tenaga 51,692.00


Overhead + Profit 10% 5,169.20
Jumlah Total Upah 56,861.20

46 1 m1 Pemasangan Pipa PVC Ø 6" A.8.4.1.4


Bahan
Pipa PVC Ø 6" 1.000 m 156,070.00 156,070.00
Jumlah Bahan 156,070.00
Upah
Pekerja 0.118 oh 78,000.00 9,204.00
Tukang Pipa 0.059 oh 93,000.00 5,487.00
Mandor 0.012 oh 103,000.00 1,236.00
Jumlah Tenaga Kerja 15,927.00

Peralatan
Sewa Tripot/Tackel& handle crane 2 T 0.019 Hari 75,000.00 1,425.00
Jumlah Peralatan 1,425.00

Jumlah Bahan,Alat Dan Tenaga 173,422.00


Overhead + Profit 10% 17,342.20
Jumlah Total Upah 190,764.20

47 1 m1 Pemasangan Pipa PVC Ø 8" A.8.4.1.5


Bahan
Pipa PVC Ø 8" 1.000 m 220,500.00 220,500.00
Jumlah Bahan 220,500.00
Upah
Pekerja 0.189 oh 78,000.00 14,742.00
Tukang Pipa 0.095 oh 93,000.00 8,835.00
Mandor 0.019 oh 103,000.00 1,957.00
Jumlah Tenaga Kerja 25,534.00

49 of 84
PEKERJAAN HARGA
NO UPAH KODE VOLUME SAT SATUAN JUMLAH
BAHAN (Rp) (Rp)

Peralatan
Sewa Tripot/Tackel& handle crane 2 T 0.024 Hari 75,000.00 1,800.00
Jumlah Peralatan 1,800.00

Jumlah Bahan,Alat Dan Tenaga 247,834.00


Overhead + Profit 10% 24,783.40
Jumlah Total Upah 272,617.40

48 1 m1 Pemasangan Pipa GI Ø 1/2" A.5.1.1 20


Bahan
Pipa GI Ø 1/2" 1.200 m 29,500.00 35,400.00
Perlengkapan 35.000 % 10,325.00 10,325.00
Jumlah Bahan 45,725.00
Upah
Pekerja 0.054 oh 78,000.00 4,212.00
Tukang Pipa 0.090 oh 93,000.00 8,370.00
Kepala Tukang 0.009 oh 98,000.00 882.00
Mandor 0.027 oh 103,000.00 2,781.00
Jumlah Tenaga Kerja 16,245.00

Jumlah Bahan,Alat Dan Tenaga 61,970.00


Overhead + Profit 10% 6,197.00
Jumlah Total Upah 68,167.00
49 1 m1 Pemasangan Pipa GI Ø 1"
Bahan
Pipa GI Ø 1" 1.000 m 53,000.00 53,000.00
Jumlah Bahan 53,000.00
Upah
Pekerja 0.345 oh 78,000.00 26,910.00
Tukang Pipa 0.172 oh 93,000.00 15,996.00
Mandor 0.034 oh 103,000.00 3,502.00
Jumlah Tenaga Kerja 46,408.00

Jumlah Bahan,Alat Dan Tenaga 99,408.00


Overhead + Profit 10% 9,940.80
Jumlah Total Upah 109,348.80

50 1 m1 Pemasangan Pipa GI Ø 2" A.8.4.1.33


Bahan
Pipa GI Ø 2" 1.000 m 112,000.00 112,000.00
Jumlah Bahan 112,000.00
Upah
Pekerja 0.345 oh 78,000.00 26,910.00
Tukang Pipa 0.172 oh 93,000.00 15,996.00
Mandor 0.034 oh 103,000.00 3,502.00
Jumlah Tenaga Kerja 46,408.00

Jumlah Bahan,Alat Dan Tenaga 158,408.00


Overhead + Profit 10% 15,840.80
Jumlah Total Upah 174,248.80

51 1 m1 Pemasangan Pipa GI Ø 75 mm
Bahan
Pipa GI Ø 75 mm 1.000 m 170,000.00 170,000.00
Jumlah Bahan 170,000.00
Upah
Pekerja 0.345 oh 78,000.00 26,910.00
Tukang Pipa 0.172 oh 93,000.00 15,996.00
Mandor 0.034 oh 103,000.00 3,502.00
Jumlah Tenaga Kerja 46,408.00
Peralatan
Sewa Tripot/Tackel& handle crane 2 T Hari 75,000.00 -
Jumlah Peralatan -

Jumlah Bahan,Alat Dan Tenaga 216,408.00


Overhead + Profit 10% 21,640.80
Jumlah Total Upah 238,048.80

52 1 m1 Pemasangan Pipa GI Ø 100 mm A.8.4.1.34


Bahan
Pipa GI Ø 100 mm 1.000 m 242,000.00 242,000.00
Jumlah Bahan 242,000.00
Upah
Pekerja 0.400 oh 78,000.00 31,200.00
Tukang Pipa 0.200 oh 93,000.00 18,600.00
Mandor 0.040 oh 103,000.00 4,120.00
Jumlah Tenaga Kerja 53,920.00
Peralatan
Sewa Tripot/Tackel& handle crane 2 T Hari 75,000.00 -
Jumlah Peralatan -

Jumlah Bahan,Alat Dan Tenaga 295,920.00


Overhead + Profit 10% 29,592.00
Jumlah Total Upah 325,512.00

53 1 m1 Pemasangan Pipa GI Ø 150 mm A.8.4.1.36


Bahan
Pipa GI Ø 150 mm 1.000 m 347,000.00 347,000.00
Jumlah Bahan 347,000.00
Upah
Pekerja 0.506 oh 78,000.00 39,468.00
Tukang Pipa 0.253 oh 93,000.00 23,529.00
Mandor 0.051 oh 103,000.00 5,253.00
Jumlah Tenaga Kerja 68,250.00
Peralatan
Sewa Tripot/Tackel& handle crane 2 T Hari 75,000.00 -
Jumlah Peralatan -

Jumlah Bahan,Alat Dan Tenaga 415,250.00


Overhead + Profit 10% 41,525.00
Jumlah Total Upah 456,775.00

54 1 m1 Pemasangan Pipa GI Ø 200 mm A.8.4.1.37


Bahan
Pipa GI Ø 200 mm 1.000 m 680,000.00 680,000.00
Jumlah Bahan 680,000.00
Upah
Pekerja 0.796 oh 78,000.00 62,088.00
Tukang Pipa 0.398 oh 93,000.00 37,014.00
Mandor 0.080 oh 103,000.00 8,240.00
Jumlah Tenaga Kerja 107,342.00
Peralatan
Sewa Tripot/Tackel& handle crane 2 T Hari 75,000.00 -
Jumlah Peralatan -

Jumlah Bahan,Alat Dan Tenaga 787,342.00


Overhead + Profit 10% 78,734.20
Jumlah Total Upah 866,076.20

55 1 m1 Pemasangan Pipa GI Ø 250 mm A.8.4.1.38


Bahan
Pipa GI Ø 250 mm 1.000 m 1,125,000.00 1,125,000.00

50 of 84
PEKERJAAN HARGA
NO UPAH KODE VOLUME SAT SATUAN JUMLAH
BAHAN (Rp) (Rp)

Jumlah Bahan 1,125,000.00


Upah
Pekerja 0.949 oh 78,000.00 74,022.00
Tukang Pipa 0.475 oh 93,000.00 44,175.00
Mandor 0.095 oh 103,000.00 9,785.00
Jumlah Tenaga Kerja 127,982.00
Peralatan
Sewa Tripot/Tackel& handle crane 2 T Hari 75,000.00 -
Jumlah Peralatan -

Jumlah Bahan,Alat Dan Tenaga 1,252,982.00


Overhead + Profit 10% 125,298.20
Jumlah Total Upah 1,378,280.20

56 1 m1 Pemasangan Pipa HDPE Ø 63 mm A.8.4.1.17


Bahan
Pipa HDPE Ø 63 mm 1.000 m 55,648.50 55,648.50
Jumlah Bahan 55,648.50
Upah
Pekerja 0.035 oh 78,000.00 2,730.00
Tukang Pipa 0.017 oh 93,000.00 1,581.00
Mandor 0.003 oh 103,000.00 309.00
Jumlah Tenaga Kerja 4,620.00
Peralatan
Sewa Tripot/Tackel& handle crane 2 T 0.019 Hari 75,000.00 1,425.00
Jumlah Peralatan 1,425.00

Jumlah Bahan,Alat Dan Tenaga 61,693.50


Overhead + Profit 10% 6,169.35
Jumlah Total Upah 67,862.85
57 1 m1 Pemasangan Pipa HDPE Ø 90 mm
Bahan
Pipa HDPE Ø 90 mm 1.000 m 95,720.00 95,720.00
Jumlah Bahan 95,720.00
Upah
Pekerja 0.040 oh 78,000.00 3,120.00
Tukang Pipa 0.020 oh 93,000.00 1,860.00
Mandor 0.004 oh 103,000.00 412.00
Jumlah Tenaga Kerja 5,392.00
Peralatan
Sewa Tripot/Tackel& handle crane 2 T 0.019 Hari 75,000.00 1,425.00
Jumlah Peralatan 1,425.00

Jumlah Bahan,Alat Dan Tenaga 102,537.00


Overhead + Profit 10% 10,253.70
Jumlah Total Upah 112,790.70

58 1 m1 Pemasangan Pipa HDPE Ø 100 mm A.8.4.1.18


Bahan
Pipa HDPE Ø 100 mm 1.000 m 143,060.00 143,060.00
Jumlah Bahan 143,060.00
Upah
Pekerja 0.040 oh 78,000.00 3,120.00
Tukang Pipa 0.020 oh 93,000.00 1,860.00
Mandor 0.004 oh 103,000.00 412.00
Jumlah Tenaga Kerja 5,392.00
Peralatan
Sewa Tripot/Tackel& handle crane 2 T 0.019 Hari 75,000.00 1,425.00
Jumlah Peralatan 1,425.00

Jumlah Bahan,Alat Dan Tenaga 149,877.00


Overhead + Profit 10% 14,987.70
Jumlah Total Upah 164,864.70

59 1 m1 Pemasangan Pipa HDPE Ø 150 mm A.8.4.1.20


Bahan
Pipa HDPE Ø 150 mm 1.000 m 299,660.00 299,660.00
Jumlah Bahan 299,660.00
Upah
Pekerja 0.035 oh 78,000.00 2,730.00
Tukang Pipa 0.017 oh 93,000.00 1,581.00
Mandor 0.003 oh 103,000.00 309.00
Jumlah Tenaga Kerja 4,620.00
Peralatan
Sewa Tripot/Tackel& handle crane 2 T 0.019 Hari 75,000.00 1,425.00
Jumlah Peralatan 1,425.00

Jumlah Bahan,Alat Dan Tenaga 305,705.00


Overhead + Profit 10% 30,570.50
Jumlah Total Upah 336,275.50

60 1 m1 Pemasangan Pipa HDPE Ø 200 mm A.8.4.1.21


Bahan
Pipa HDPE Ø 200 mm 1.000 m 469,220.00 469,220.00
Jumlah Bahan 469,220.00
Upah
Pekerja 0.035 oh 78,000.00 2,730.00
Tukang Pipa 0.017 oh 93,000.00 1,581.00
Mandor 0.003 oh 103,000.00 309.00
Jumlah Tenaga Kerja 4,620.00
Peralatan
Sewa Tripot/Tackel& handle crane 2 T 0.019 Hari 75,000.00 1,425.00
Jumlah Peralatan 1,425.00

Jumlah Bahan,Alat Dan Tenaga 475,265.00


Overhead + Profit 10% 47,526.50
Jumlah Total Upah 522,791.50
61 Pemasangan Flans Las dia. 2" Pendekatan
Bahan
Flange Las Ø 50 mm 1.000 m 58,960.00 58,960.00
Baut 3/8 4.000 m 4,000.00 16,000.00
Karet Packing Ø 50mm 1.000 m 3,650.00 3,650.00
Jumlah Bahan 78,610.00
Upah
Pekerja 0.080 oh 78,000.00 6,240.00
Mandor 0.008 oh 103,000.00 824.00
Jumlah Tenaga Kerja 7,064.00
Peralatan

Jumlah Peralatan -

Jumlah Bahan,Alat Dan Tenaga 85,674.00


Overhead + Profit 10% 8,567.40
Jumlah Total Upah 94,241.40
62 Pemasangan Flans Las dia. 3" Pendekatan
Bahan
Flange Las Ø 75 mm 1.000 m 73,392.00 73,392.00
Baut 3/8 4.000 m 4,000.00 16,000.00
Karet Packing Ø 75 mm 1.000 m 5,100.00 5,100.00
Jumlah Bahan 94,492.00
Upah
Pekerja 0.080 oh 78,000.00 6,240.00
Mandor 0.008 oh 103,000.00 824.00

51 of 84
PEKERJAAN HARGA
NO UPAH KODE VOLUME SAT SATUAN JUMLAH
BAHAN (Rp) (Rp)

Jumlah Tenaga Kerja 7,064.00


Peralatan

Jumlah Peralatan -

Jumlah Bahan,Alat Dan Tenaga 101,556.00


Overhead + Profit 10% 10,155.60
Jumlah Total Upah 111,711.60
63 Pemasangan Flans Las dia. 4" Pendekatan
Bahan
Flange Las Ø 100 mm 1.000 m 101,640.00 101,640.00
Baut 3/8 4.000 m 4,000.00 16,000.00
Karet Packing Ø 100 mm 1.000 m 6,750.00 6,750.00
Jumlah Bahan 124,390.00
Upah
Pekerja 0.080 oh 78,000.00 6,240.00
Mandor 0.008 oh 103,000.00 824.00
Jumlah Tenaga Kerja 7,064.00
Peralatan

Jumlah Peralatan -

Jumlah Bahan,Alat Dan Tenaga 131,454.00


Overhead + Profit 10% 13,145.40
Jumlah Total Upah 144,599.40
64 Pemasangan Flans Las dia. 6" Pendekatan
Bahan
Flange Las Ø 150 mm 1.000 m 165,000.00 165,000.00
Baut 3/8 4.000 m 4,000.00 16,000.00
Karet Packing Ø 150 mm 1.000 m 12,200.00 12,200.00
Jumlah Bahan 193,200.00
Upah
Pekerja 0.080 oh 78,000.00 6,240.00
Mandor 0.008 oh 103,000.00 824.00
Jumlah Tenaga Kerja 7,064.00
Peralatan

Jumlah Peralatan -

Jumlah Bahan,Alat Dan Tenaga 200,264.00


Overhead + Profit 10% 20,026.40
Jumlah Total Upah 220,290.40
65 Pemasangan Flans Las dia. 8" Pendekatan
Bahan
Flange Las Ø 200 mm 1.000 m 240,240.00 240,240.00
Baut 3/8 4.000 m 4,000.00 16,000.00
Karet Packing Ø 200 mm 1.000 m 17,650.00 17,650.00
Jumlah Bahan 273,890.00
Upah
Pekerja 0.080 oh 78,000.00 6,240.00
Mandor 0.008 oh 103,000.00 824.00
Jumlah Tenaga Kerja 7,064.00
Peralatan

Jumlah Peralatan -

Jumlah Bahan,Alat Dan Tenaga 280,954.00


Overhead + Profit 10% 28,095.40
Jumlah Total Upah 309,049.40
66 Pemasangan Flans Las dia. 10" Pendekatan
Bahan
Flange Las Ø 250 mm 1.000 m 303,600.00 303,600.00
Baut 3/8 4.000 m 4,000.00 16,000.00
Karet Packing Ø 250 mm 1.000 m 26,700.00 26,700.00
Jumlah Bahan 346,300.00
Upah
Pekerja 0.080 oh 78,000.00 6,240.00
Mandor 0.008 oh 103,000.00 824.00
Jumlah Tenaga Kerja 7,064.00
Peralatan

Jumlah Peralatan -

Jumlah Bahan,Alat Dan Tenaga 353,364.00


Overhead + Profit 10% 35,336.40
Jumlah Total Upah 388,700.40
67 1 Buah Pemasangan Valve 200 mm A.8.4.3.2
Bahan
Valve 200 mm 1.000 m 4,140,900.00 4,140,900.00
Jumlah Bahan 4,140,900.00
Upah
Pekerja 1.714 oh 78,000.00 133,692.00
Tukang Pipa 0.857 oh 93,000.00 79,701.00
Mandor 0.171 oh 103,000.00 17,613.00
Jumlah Tenaga Kerja 231,006.00
Peralatan
Sewa Tripot/Tackel& handle crane 2 T 0.300 Hari 75,000.00 22,500.00
Jumlah Peralatan 22,500.00

Jumlah Bahan,Alat Dan Tenaga 4,394,406.00


Overhead + Profit 10% 439,440.60
Jumlah Total Upah 4,833,846.60

68 1 Buah Pemasangan Valve 250 mm A.8.4.3.3


Bahan
Valve 250 mm 1.000 m 5,785,000.00 5,785,000.00
Jumlah Bahan 5,785,000.00
Upah
Pekerja 1.714 oh 78,000.00 133,692.00
Tukang Pipa 0.857 oh 93,000.00 79,701.00
Mandor 0.171 oh 103,000.00 17,613.00
Jumlah Tenaga Kerja 231,006.00
Peralatan
Sewa Tripot/Tackel& handle crane 2 T 0.400 Hari 75,000.00 30,000.00
Jumlah Peralatan 30,000.00

Jumlah Bahan,Alat Dan Tenaga 6,046,006.00


Overhead + Profit 10% 604,600.60
Jumlah Total Upah 6,650,606.60

69 1 m Pengetesan Pipa Ø 2" A.8.4.5.1

Bahan
Air 2.000 lt Rp 30.00 60.00
Bahan Bakar 0.060 lt Rp 7,800.00 468.00
Oli 0.002 lt Rp 10,300.00 20.60
Jumlah Bahan 548.60
Upah
Pekerja 0.008 oh 78,000.00 624.00
Mandor 0.001 oh 103,000.00 82.40
Jumlah Tenaga Kerja 706.40

Jumlah Bahan,Alat Dan Tenaga 1,255.00


Overhead + Profit 10% 125.50

52 of 84
PEKERJAAN HARGA
NO UPAH KODE VOLUME SAT SATUAN JUMLAH
BAHAN (Rp) (Rp)

Jumlah Total Upah 1,380.50

70 1 m Pengetesan Pipa Ø 3" A.8.4.5.2

Bahan
Air 4.000 lt Rp 30.00 120.00
Bahan Bakar 0.060 lt Rp 7,800.00 468.00
Oli 0.002 lt Rp 10,300.00 20.60
Jumlah Bahan 608.60
Upah
Pekerja 0.008 oh 78,000.00 624.00
Mandor 0.001 oh 103,000.00 82.40
Jumlah Tenaga Kerja 706.40

Jumlah Bahan,Alat Dan Tenaga 1,315.00


Overhead + Profit 10% 131.50
Jumlah Total Upah 1,446.50

71 1 m Pengetesan Pipa Ø 4" A.8.4.5.3

Bahan
Air 8.000 lt Rp 30.00 240.00
Bahan Bakar 0.060 lt Rp 7,800.00 468.00
Oli 0.002 lt Rp 10,300.00 20.60
Jumlah Bahan 728.60
Upah
Pekerja 0.008 oh 78,000.00 624.00
Mandor 0.001 oh 103,000.00 82.40
Jumlah Tenaga Kerja 706.40

Jumlah Bahan,Alat Dan Tenaga 1,435.00


Overhead + Profit 10% 143.50
Jumlah Total Upah 1,578.50
72 1 m Pengetesan Pipa Ø 6" A.8.4.5.4

Bahan
Air 18.000 lt Rp 30.00 540.00
Bahan Bakar 0.060 lt Rp 7,800.00 468.00
Oli 0.002 lt Rp 10,300.00 20.60
Jumlah Bahan 1,028.60
Upah
Pekerja 0.008 oh 78,000.00 624.00
Mandor 0.001 oh 103,000.00 82.40
Jumlah Tenaga Kerja 706.40

Jumlah Bahan,Alat Dan Tenaga 1,735.00


Overhead + Profit 10% 173.50
Jumlah Total Upah 1,908.50

73 1 m Pengetesan Pipa Ø 8" A.8.4.5.5

Bahan
Air 31.000 lt Rp 30.00 930.00
Bahan Bakar 0.060 lt Rp 7,800.00 468.00
Oli 0.002 lt Rp 10,300.00 20.60
Jumlah Bahan 1,418.60
Upah
Pekerja 0.008 oh 78,000.00 624.00
Mandor 0.001 oh 103,000.00 82.40
Jumlah Tenaga Kerja 706.40

Jumlah Bahan,Alat Dan Tenaga 2,125.00


Overhead + Profit 10% 212.50
Jumlah Total Upah 2,337.50

74 1 m Pencucian Pipa PVC/GI/HDPE

Bahan
Air 0.037 lt Rp 2,500.00 91.25
Jumlah Bahan 91.25
Upah
Pekerja 0.005 oh 78,000.00 390.00
Mandor 0.001 oh 103,000.00 51.50
Jumlah Tenaga Kerja 441.50

Jumlah Bahan,Alat Dan Tenaga 532.75


Overhead + Profit 10% 53.28
Jumlah Total Upah 586.03

75 1 m2 Pemasangan Paving Tebal 6 cm A.4.4.3.64.


Bahan
Paving Blok 6 cm 1.010 m2 76,700.00 77,467.00
Pasir Beton 0.050 m3 373,500.00 18,675.00
Jumlah Bahan 96,142.00
Upah
Pekerja 0.250 oh 78,000.00 19,500.00
Tukang Pipa 0.500 oh 93,000.00 46,500.00
Kepala Tukang 0.050 oh 98,000.00 4,900.00
Mandor 0.001 oh 103,000.00 133.90
Jumlah Tenaga Kerja 71,033.90
Peralatan :
Peralatan 10% % 76,700.00 7,670.00
Jumlah Alat 7,670.00

Jumlah Bahan,Alat Dan Tenaga 174,845.90


Overhead + Profit 10% 17,484.59
Jumlah Total Upah 192,330.49
76 1 m2 Pemasangan Paving Tebal 8 cm (Rekondisi Non Paving)
Bahan
Paving Blok 8 cm 1.010 m2 -
Pasir Beton 0.050 m3 373,500.00 18,675.00
Jumlah Bahan 18,675.00
Upah
Pekerja 0.080 oh 78,000.00 6,240.00
Tukang Pipa 0.030 oh 93,000.00 2,790.00
Kepala Tukang 0.050 oh 98,000.00 4,900.00
Mandor 0.050 oh 103,000.00 5,150.00
Jumlah Tenaga Kerja 19,080.00

Jumlah Bahan,Alat Dan Tenaga 37,755.00


Overhead + Profit 10% 3,775.50
Jumlah Total Upah 41,530.50

77 1 m2 Aspal AC
Bahan
Agregat Klas A 0.012 m3 268,900.00 3,226.80
Agregat Klas B 0.023 m3 274,300.00 6,308.90
Aspal 5.320 Kg 15,000.00 79,800.00
Jumlah Bahan 89,335.70
Upah
Pekerja 0.040 oh 78,000.00 3,120.00
Mandor 0.004 oh 103,000.00 412.00
Jumlah Tenaga Kerja 3,532.00
Peralatan :
Alat Bantu 1.000 Ls 10,000.00 10,000.00

53 of 84
PEKERJAAN HARGA
NO UPAH KODE VOLUME SAT SATUAN JUMLAH
BAHAN (Rp) (Rp)

Jumlah Alat 10,000.00


Jumlah Bahan,Alat Dan Tenaga 102,867.70
Overhead + Profit 10% 10,286.77
Jumlah Total Upah 113,154.47
78 1 m Bor Jacking Pipa Ø Ø 10" + Selubung Pipa GI Ø 10"
Bahan
Pipa GI Ø 10" 1.000 m 1,125,000.00 1,125,000.00
Jumlah Bahan 1,125,000.00
Peralatan :
Bor Jacking Pipa Ø 6" 1.000 m 225,000.000 225,000.00
Jumlah Alat 225,000.00
Jumlah Bahan,Alat Dan Tenaga 1,350,000.00
Overhead + Profit 10% 135,000.00
Jumlah Total Upah 1,485,000.00
79 1 m Bor Jacking Pipa Ø Ø 8" + Selubung Pipa GI Ø 8"
Bahan
Pipa GI Ø 8" 1.000 m 680,000.00 680,000.00
Jumlah Bahan 680,000.00
Peralatan :
Bor Jacking Pipa Ø 6" 1.000 m 200,000.000 200,000.00
Jumlah Alat 200,000.00
Jumlah Bahan,Alat Dan Tenaga 880,000.00
Overhead + Profit 10% 88,000.00
Jumlah Total Upah 968,000.00

80 1 m Bor Jacking Pipa Ø Ø 6" + Selubung Pipa GI Ø 6"


Bahan
Pipa GI Ø 6" 1.000 m 347,000.00 347,000.00
Jumlah Bahan 347,000.00
Peralatan :
Bor Jacking Pipa Ø 6" 1.000 m 150,000.000 150,000.00
Jumlah Alat 150,000.00
Jumlah Bahan,Alat Dan Tenaga 497,000.00
Overhead + Profit 10% 49,700.00
Jumlah Total Upah 546,700.00

81 1 m Bor Jacking Pipa Ø 4" + Selubung Pipa GI Ø 4"


Bahan
Pipa GI Ø 4" 1.000 m 242,000.00 242,000.00
Jumlah Bahan 242,000.00
Peralatan :
Bor Jacking Pipa Ø 6" 1.000 m 125,000.000 125,000.00
Jumlah Alat 125,000.00
Jumlah Bahan,Alat Dan Tenaga 367,000.00
Overhead + Profit 10% 36,700.00
Jumlah Total Upah 403,700.00

82 1 m Bor Jacking Pipa Ø 3" + Selubung Pipa GI Ø 3"


Bahan
Pipa GI Ø 3" 1.000 m 170,000.00 170,000.00
Jumlah Bahan 170,000.00
Peralatan :
Bor Jacking Pipa Ø 3" 1.000 m 100,000.000 100,000.00
Jumlah Alat 100,000.00
Jumlah Bahan,Alat Dan Tenaga 270,000.00
Overhead + Profit 10% 27,000.00
Jumlah Total Upah 297,000.00

83 1 m Bor Jacking Pipa Ø 2" + Selubung Pipa GI Ø 2"


Bahan
Pipa GI Ø 2" 1.000 m 112,000.00 112,000.00
Jumlah Bahan 112,000.00
Peralatan :
Bor Jacking Pipa Ø 3" 1.000 m 100,000.000 100,000.00
Jumlah Alat 100,000.00
Jumlah Bahan,Alat Dan Tenaga 212,000.00
Overhead + Profit 10% 21,200.00
Jumlah Total Upah 233,200.00

84 Pembuatan & Pemasangan 1 m3 Kusen Pintu+Kusen Jendela KK.3 A.4.6.1.1.


Bahan
Balok Kayu 1.1 m3 3,704,980.00 4,075,478.00
Paku 10 cm 1.250 kg 19,060.00 23,825.00
Lem Kayu 1.000 kg 45,630.00 45,630.00

Jumlah Bahan 4,144,933.00


Upah
Pekerja 7.000 oh 78,000.00 546,000.00
Tukang Konstruksi 21.000 oh 93,000.00 1,953,000.00
Kepala Tukang 2.100 oh 98,000.00 205,800.00
Mandor 0.350 oh 103,000.00 36,050.00
Jumlah Tenaga Kerja 2,740,850.00

Jumlah Bahan,Alat Dan Tenaga 6,885,783.00


Overhead + Profit 10% 688,578.30
Jumlah Total Upah 7,574,361.30

85 Pembuatan & Pemasangan 1 m2 Daun Pintu Panel KK.1 A.4.6.1.5


Bahan
Papan Kayu 0.04 m3 3,704,980.00 148,199.20

54 of 84
ANALISA HARGA SATUAN PEKERJAAN

PEKERJAAN
NO UPAH KODE VOLUME SAT
BAHAN

1 1 Unit Pek. Pemasangan Panel Pendekatan


Upah :
Pekerja 1.000 oh
Tukang Listrik 1.000 oh
Kepala Tukang Listrik 0.005 oh
Jumlah Tenaga Kerja
Bahan :
Panel Box UK.40X60X25 1 bh
MCB 6 A 1 bh
Main Switch 1 bh
Sewa Alat Bantu 1 set
Jumlah Bahan

Jumlah,Harga, Dan Tenaga


Overhead + Profit 10%
Jumlah Total Upah

2 Pemasangan 1 Titik Lampu (Pakai Kabel NYA) Pendekatan


Upah :
Pekerja 1.000 oh
Tukang Listrik 1.000 oh
Kepala Tukang Listrik 0.050 oh
Jumlah Tenaga Kerja
Bahan :
Kabel NYA 2,5 mm 16.500 m'
Kabel NYA 1,5 mm 5.500 m'
Pipa Pralon 5/8 16.500 m'
Las Doof 3.300 bh
T Doos PVC 1.100 bh
Fitting Plafond 1.100 bh
Paku Biasa 0.088 kg
Semen Portland 1.650 kg
Klem Pipa 16.500 bh
Jumlah Bahan

Jumlah,Harga, Dan Tenaga


Overhead + Profit 10%
Jumlah Total Upah

3 Pemasangan 1 Titik Lampu (Pakai Kabel NYM) Pendekatan


Upah :
Pekerja 0.250 oh
Tukang Listrik 0.250 oh
Kepala Tukang Listrik 0.050 oh
Jumlah Tenaga Kerja
Bahan :
Kabel NYM 2,5 mm 8.250 m'
Kabel NYM 1,5 mm 2.750 m'
Pipa Pralon 5/8 2.200 m'
Las Doof 3.300 bh
T Doos PVC 1.100 bh
Fitting Plafond 1.100 bh
Paku Biasa 0.099 kg
Semen Portland 1.650 kg
Klem Pipa 16.500 bh
Jumlah Bahan

Jumlah,Harga, Dan Tenaga


Overhead + Profit 10%
Jumlah Total Upah

4 Pemasangan 1 Titik Stop Kontak Pendekatan


Upah :
Pekerja 0.050 oh
Tukang Listrik 0.500 oh
Kepala Tukang Listrik 0.005 oh
Jumlah Tenaga Kerja
Bahan :
Kabel NYA 2,5 mm 5.000 m'
Pipa Pralon 5/8 0.200 m'
T Doos PVC 1.000 bh
Stop Kontak (Broco) 1.000 bh
Jumlah Bahan

Jumlah,Harga, Dan Tenaga


Overhead + Profit 10%
Jumlah Total Upah

5 Pemasangan 1 Titik Sakelar Tunggal (Broco) Pendekatan


Upah :
Pekerja 1.000 oh
Tukang Listrik 1.000 oh
Kepala Tukang Listrik 0.050 oh
Jumlah Tenaga Kerja
Bahan :
Sakelar Tunggal (Broco) 1.100 bh
Kabel NYA 2,5 mm 2.200 m'
Pipa Pralon 5/8 2.200 m'
Las Doof 3.300 bh
T Doos PVC 1.100 bh
Paku Biasa 0.088 Kg
Semen Portland 1.650 Kg
Klem Pipa 16.500 bh
Jumlah Bahan

Jumlah,Harga, Dan Tenaga


Overhead + Profit 10%
Jumlah Total Upah

6 Pemasangan 1 Titik Sakelar Ganda (Broco) Pendekatan


Upah :
Pekerja 1.000 oh
Tukang Listrik 1.000 oh
Kepala Tukang Listrik 0.050 oh
Jumlah Tenaga Kerja
Bahan :
Sakelar Ganda (Broco) 1.100 bh
Kabel NYA 2,5 mm 2.200 m'
Pipa Pralon 5/8 2.200 m'
Las Doof 3.300 bh
T Doos PVC 1.100 bh
Paku Biasa 0.088 Kg
Semen Portland 1.650 Kg
Klem Pipa 16.500 bh

Jumlah Bahan

Jumlah,Harga, Dan Tenaga


Overhead + Profit 10%
Jumlah Total Upah

7 1 Buah Pemasangan Lampu TL 2x20 Watt (reflektor Pendekatan


Lengkap)
Upah :
Pekerja 0.010 oh
Tukang Listrik 0.020 oh
Kepala Tukang Listrik 0.005 oh
Jumlah Tenaga Kerja
Bahan :
Lampu TL 2x20 Watt+Reflektor Lengkap 1.000 bh
Jumlah Bahan

Jumlah,Harga, Dan Tenaga


Overhead + Profit 10%
Jumlah Total Upah

8 1 Buah Pemasangan SL.18 Watt Pendekatan


Upah :
Pekerja 0.010 oh
Tukang Listrik 0.020 oh
Kepala Tukang Listrik 0.005 oh
Jumlah Tenaga Kerja
Bahan :
Lampu SL 18 Watt 1.000 bh
Jumlah Bahan

Jumlah,Harga, Dan Tenaga


Overhead + Profit 10%
Jumlah Total Upah
AAN

HARGA
SATUAN JUMLAH
(Rp) (Rp)

78,000.00 78,000.00
93,000.00 93,000.00
98,000.00 490.00
mlah Tenaga Kerja 171,490.00

382,950.00 382,950.00
35,070.00 35,070.00
203,250.00 203,250.00
121,700.00 121,700.00
Jumlah Bahan 742,970.00

914,460.00
91,446.00
1,005,906.00

78,000.00 78,000.00
93,000.00 93,000.00
98,000.00 4,900.00
mlah Tenaga Kerja 175,900.00

3,150.00 51,975.00
1,920.00 10,560.00
1,120.00 18,480.00
1,600.00 5,280.00
3,090.00 3,399.00
15,530.00 17,083.00
19,060.00 1,677.28
1,200.00 1,980.00
150.00 2,475.00
Jumlah Bahan 112,909.28

288,809.28
28,880.93
317,690.21
78,000.00 19,500.00
93,000.00 23,250.00
98,000.00 4,900.00
mlah Tenaga Kerja 47,650.00

8,650.00 71,362.50
6,070.00 16,692.50
1,120.00 2,464.00
1,600.00 5,280.00
3,090.00 3,399.00
15,530.00 17,083.00
19,060.00 1,886.94
1,200.00 1,980.00
150.00 2,475.00
Jumlah Bahan 122,622.94

170,272.94
17,027.29
187,300.23

78,000.00 3,900.00
93,000.00 46,500.00
98,000.00 490.00
mlah Tenaga Kerja 50,890.00

3,150.00 15,750.00
1,120.00 224.00
3,090.00 3,090.00
11,020.00 11,020.00
Jumlah Bahan 30,084.00

80,974.00
8,097.40
89,071.40

78,000.00 78,000.00
93,000.00 93,000.00
98,000.00 4,900.00
mlah Tenaga Kerja 175,900.00

12,770.00 14,047.00
3,150.00 6,930.00
1,120.00 2,464.00
1,600.00 5,280.00
3,090.00 3,399.00
19,060.00 1,677.28
1,200.00 1,980.00
150.00 2,475.00
Jumlah Bahan 38,252.28

214,152.28
21,415.23
235,567.51

78,000.00 78,000.00
93,000.00 93,000.00
98,000.00 4,900.00
mlah Tenaga Kerja 175,900.00

14,020.00 15,422.00
3,150.00 6,930.00
1,120.00 2,464.00
1,600.00 5,280.00
3,090.00 3,399.00
19,060.00 1,677.28
1,200.00 1,980.00
150.00 2,475.00

Jumlah Bahan 39,627.28

215,527.28
21,552.73
237,080.01

78,000.00 780.00
93,000.00 1,860.00
98,000.00 490.00
mlah Tenaga Kerja 3,130.00

242,850.00 242,850.00
Jumlah Bahan 242,850.00

245,980.00
24,598.00
270,578.00

78,000.00 780.00
93,000.00 1,860.00
98,000.00 490.00
mlah Tenaga Kerja 3,130.00

54,000.00 54,000.00
Jumlah Bahan 54,000.00

57,130.00
5,713.00
62,843.00
PEKERJAAN KUSEN RUMAH POMPA
PINTU PANEL P1
Uraian Pekerjaan Vol. sat
KUSEN 8/16 0.105 M3
PAPAN 3 CM 3.456 M2
GRENDEL BIASA 2.000 BH
GRENDELTANAM 2.000 BH
ENGSEL PINTU 6.000 BH
PEG. PINTU 1.000 PSG
KUNCI 1.000 UNIT
TOTAL

BOUNVETLI
Uraian Pekerjaan Vol. sat
KUSEN 8/16 0.0384 M3
besi 16 5.523 kg
TOTAL
H. Satuan Jumlah H. Satuan
Rp 7,574,361.30 Rp 795,004.96
Rp 618,820.62 Rp 2,138,644.06
Rp 37,932.40 Rp 75,864.80
Rp 37,932.40 Rp 75,864.80
Rp 46,686.64 Rp 280,119.84
Rp 140,490.00 Rp 140,490.00
Rp 74,750.50 Rp 74,750.50
Rp 3,580,738.96

H. Satuan Jumlah H. Satuan


Rp 7,574,361.30 Rp 290,855.47
Rp 12,848.88 Rp 70,964.36
Rp 361,819.84
PROGRAM TERBILANG

Bilangan Yang Dimaksud 241,100,000.00


Trilyun -
Ratus Milyar -
Puluhan Milyar -
Ratus Juta 200,000,000.00
Puluhan Juta 41,000,000.00
Ratus Ribu -
Puluhan Ribu 99,000.00
Ratusan 900.00
Puluhan 99.00
Rupiah -
Sen 1.00
-

Cek Bilangan 174,468,400,000.00


Terbilang:
Hasil (akan keluar otomatis).
Dua Ratus Empat Puluh Satu Juta Sembilan Puluh Sembilan Ribu Sembilan Ratus Sembilan Puluh SembilanRupia

Note: Don't change any thing without confirmation. It could be dangerous !!!

How to Use 1. Hubungkan cell yang akan diterjemahkan pada worksheet rekapitulasi pada "
2. Hubungkan hasil di "cell F14" ke tempat "terbilang" pada worksheet rekapitula
3. Have a nice season
Dua Ratus
Empat Puluh Satu Juta

Sembilan Puluh Sembilan Ribu


Sembilan Ratus
Sembilan Puluh Sembilan
Rupiah

sen

salah!

Ratus Sembilan Puluh SembilanRupiah0sen

ld be dangerous !!!

kan pada worksheet rekapitulasi pada "cell G2"


pat "terbilang" pada worksheet rekapitulasi

Anda mungkin juga menyukai