CONTRACTOR HSE MANAGEMENT SYSTEM
July 2015
1
CHSEMS Judul
CHSEMS Judul
CHSEMS Cycle Judul
Siklus CHSEMS
Contracted Work
Admin Administration Phase: Select A Qualified Contractor
Pre-Qualification
Selection
CHSEMS
Risk Assessment
Contract Award
Data Bank
Field Field Implementation Phase: Ensure Field Safe Work
Risk Assessment
Contracted Work
Administration Phase: Select A Qualified Contractor
Pre-Qualification
Selection
CHSEMS
Risk Assessment
Contract Award
Data Bank
Field Implementation Phase: Ensure Field Safe Work
End User/SPA/Contract
R
Judul
Holder
I
SCM
C
HSE Dept
Contractor/ Bidder
TUGAS DAN TANGGUNG
CHSEMS Champion in
Each Dept
A
JAWAB
Administration
Contracted Work
Qualification Phase: Select A Qualified Contractor
Pre-Qualification
Selection
CHSEMS
Risk Assessment
Contract Award
Data Bank
Field Implementation Phase: Ensure Field Safe Work
End User/SPA/Contract
CHSEMS Champion in
ACTIVITIES
Each Dept
HSE Dept
Holder
SCM
GM
1.Send PQ CHSEMS Questionnaire to
I R I A
Contractor/Bidder.
2.Return PQ CHSEMS Questionnaire with related
evidence. R R I A
3.Send Invitation to Contractor/Bidder for PQ
CHSEMS Clarification. I R I I A
4. Attend PQ CHSEMS Clarification.
R R R R R A
5. Determine if Site visit required. R C C I A I
6. Create Conditional Acceptance if Required.
6.1 Create CA R C C R R I A
6.2 Site Visit R C R R R I A
6.3 Register CA R I A
EVALUASI PRA KUALIFIKASI
Judul CHSEMS
Passing Grade
Kelulusan
Kontrak High
Risk
FLOW CHART
CHSEMS
Administration
Contracted Work
Qualification Phase: Select A Qualified Contractor
Pre-Qualification
Selection
CHSEMS
Risk Assessment
Contract Award
Data Bank
Field Implementation Phase: Ensure Field Safe Work
End User/SPA/Contract
CHSEMS Champion in
Contractor/ Bidder
Each Dept
HSE Dept
Holder
SCM
1.Bid opening and evaluation
R R C I I A
2.Determine if Site Visit required
R C C I A I
3.Site Visit
R C C
4.Bidder Selection
R R C I I A
5.Award
R R C I I A
6.Send unsuccessful letter to unsuccessful bidder
I R R I A
KRITERIA UMUM PENILAIAN
Judul HSE PLAN
EVALUATION CRITERIA ON HSE PLAN PROCEDURE PER SECTION/SUBSECTION/POINT
A
B C D
Not Meet the Minimum
Below Minimum Expectation Meet the Minimum Expectation Exceed Minimum Expectation
Expectation
No evidence as per request by Provide evidence, however only in Provide evidence in detail for the Provide a comprehensive evidence
minimum expectation in the general, no detail evidence as project as required by the minimum for the project beyond the
section/subsection/point required by minimum expectation expectation in the minimum expectation in the
in the section/subsection/point section/subsection/point section/subsection/point
Min Score
Item Description (of max 100) Weight Factor
1 Technical Aspect 70 90%
HSE Plan as exhibit H required and Site
2 70 10%
Visit (if required)
Total 100%
Pre Job Activity
Pre-Qualification
CHSEMS
Risk Assessment Selection
End User/SPA/Contract
CHSEMS Champion
in Each Dept
Contractor
HSE Dept
Holder
SCM
Pre-Mobilization Phase:
Mobilization Phase:
Jumlah WIP
• Rekomendasi Faill/Pass
FORM PJA AUDIT Judul
HSE Induction
FORM PJA AUDIT Judul
PJA Meeting
FORM PJA AUDIT Judul
Tandatangan
Komitmen HSE
Judul
Work In Progress
Work In Progress
Contracted Work
Pre-Qualification
Selection
CHSEMS
Risk Assessment
Contract Award
Data Bank
Field Implementation Phase: Ensure Field Safe Work
End User/SPA/Contract
CHSEMS Champion in
HSES Dept
Contractor
Each Dept
Holder
SCM
1. Determine WIP Schedule R C I A
2. Initiate Opening Meeting R C R A
3. Conduct HSE Inspection Audit R C R A
4. Conduct HSE Program Audit R C R A
5. Determine Interim Evaluation Score R C I A
6. Close Out Meeting R C R A
PROSES WIP Judul
Evaluasi
Kinerja HSE
Inspeksi Sementara
HSE
Program
Inspeksi HSE
Work
Practice
Untuk memonitor penyelesaian rekomendasi pada WIP, rekomendasi agar dituliskan dalam
NC Form
Final Evaluation
Pre-Qualification
Selection
CHSEMS
Risk Assessment
Contract Award
Data Bank
Field Implementation Phase: Ensure Field Safe Work
End User/SPA/Contract
CHSEMS Champion in
Contractor/
HSES Dept
Each Dept
Holder
SCM
1.Determine FE Schedule R C I A
2.Initiate Opening Meeting R C R A
3.Determine Final Evaluation Score R C I A
4.Close Out Meeting R C R A
5.Determine Final HSE Performance R A I I I
6.Reward & Punishment
R I R I I
PENILAIAN FINAL EVALUATION
Judul
Judul
FORM FINAL EVALUATION
Judul
FORM FINAL EVALUATION
Data KPI Kontraktor selama Project:
• Leading dan Lagging Indicator.
Judul (KPI Kontraktor)
FORM FINAL EVALUATION
Judul
FORM FINAL EVALUATION (Tindak Lanjut Temuan)