BAB III
ANALISA STRUKTUR RESERVOIR
13
LAPORAN ANALISA STRUKTUR RESEROIR
WAY SEKAMPUNG 2020
Analisa Struktur Reservoir
b. Material
14
LAPORAN ANALISA STRUKTUR RESEROIR
WAY SEKAMPUNG 2020
Analisa Struktur Reservoir
c. Beban Gempa
15
LAPORAN ANALISA STRUKTUR RESEROIR
WAY SEKAMPUNG 2020
Analisa Struktur Reservoir
16
LAPORAN ANALISA STRUKTUR RESEROIR
WAY SEKAMPUNG 2020
Analisa Struktur Reservoir
17
LAPORAN ANALISA STRUKTUR RESEROIR
WAY SEKAMPUNG 2020
Analisa Struktur Reservoir
18
LAPORAN ANALISA STRUKTUR RESEROIR
WAY SEKAMPUNG 2020
Analisa Struktur Reservoir
19
LAPORAN ANALISA STRUKTUR RESEROIR
WAY SEKAMPUNG 2020
Analisa Struktur Reservoir
20
LAPORAN ANALISA STRUKTUR RESEROIR
WAY SEKAMPUNG 2020
Analisa Struktur Reservoir
21
LAPORAN ANALISA STRUKTUR RESEROIR
WAY SEKAMPUNG 2020
Analisa Struktur Reservoir
22
LAPORAN ANALISA STRUKTUR RESEROIR
WAY SEKAMPUNG 2020
Analisa Struktur Reservoir
Y 24.246.700,0 18,7 400,0 13,0 150,0 250,000 OK OK 258,8% 1.017,098 82,575 0,007 1.114.158,670 62.757.969,9
Slab Bawah X 9.701.500,0 18,7 400,0 16,0 150,0 400,000 OK OK 1793,3% 1.540,693 149,400 0,007 2.015.807,513 173.975.052,7
Y 3.716.800,0 18,7 400,0 16,0 150,0 400,000 OK OK 4680,8% 1.540,693 149,400 0,007 2.015.807,513 173.975.052,7
Wall Eksterior (W01) X 7.097.300,0 18,7 400,0 16,0 150,0 400,000 OK OK 2451,3% 1.540,693 149,400 0,007 2.015.807,513 173.975.052,7
Y 30.530.500,0 18,7 400,0 16,0 150,0 400,000 OK OK 569,8% 1.540,693 149,400 0,007 2.015.807,513 173.975.052,7
Wall Interior (W02) X 4.681.000,0 18,7 400,0 16,0 150,0 400,000 OK OK 3716,6% 1.540,693 149,400 0,007 2.015.807,513 173.975.052,7
Y 20.627.000,0 18,7 400,0 16,0 150,0 400,000 OK OK 843,4% 1.540,693 149,400 0,007 2.015.807,513 173.975.052,7
BAFFLE X 1.350.000,0 18,7 400,0 16,0 150,0 250,000 OK OK 6724,3% 1.540,693 81,900 0,007 1.105.051,106 90.777.612,7
Y 6.009.000,0 18,7 400,0 16,0 150,0 250,000 OK OK 1510,7% 1.540,693 81,900 0,007 1.105.051,106 90.777.612,700
23
LAPORAN ANALISA STRUKTUR RESEROIR
WAY SEKAMPUNG 2020
Analisa Struktur Reservoir
PEMBEBANAN
Luas slab bawah (Asl) 416,25 m2
Tributari area (Ar) 7 m2
Tinggi air dari slab dasar 7,00 m
Tinggi maksimal air (ha) 7,00 `
Kombinasi Beban
Kombinasi 1 1,4 D 4.460,8 kg/m2
Kombinasi 2 1,2 D + 1,6 L 15.343,5 kg/m2
24
LAPORAN ANALISA STRUKTUR RESEROIR
WAY SEKAMPUNG 2020
Analisa Struktur Reservoir
Qu = 1,534 kg/cm 2
Data Sondir
Kedalaman tanah qc
m kg/cm2
3,0 5
20,0 200
Qu = 1,534 kg/cm2
Syarat = Qn > Qu --> OK
Dari pengecekan daya dukung di atas, maka tanah di dasar slab reservoir cukup
untuk mendukung beban reservoir.
25