Nomor :
Tanggal :
Sumber/Toko :
Alamat :
Hari/Tanggal :
HARGA BERSAMA
(Rp) *
UPAH
1 Tukang OH 110,000
2 Pekerja OH 95,000
4 Mandor OH 110,000
BAHAN
(Rp) *
11 Batu pecah (split) 2-3 cm M3 270,000
(Rp) *
34 Cat Menie Kg 50,000
(Rp) *
52 Hak angin Buah 15,000
HARGA BERSAMA
(Rp) *
53 Ijuk Kg 20,000
(Rp) *
76 Kuas Cat 2" Buah 25,000
(Rp) *
99 Paku asbes Kg 26,000
(Rp) *
122 Pegangan Pintu Doble Buah 250,000
(Rp) *
145 Tanah timbun M3 70,000