"KM KURNIAWAN"
LOA = 69.57 M
LPP = 65.40 M
B = 12,70 M
H = 7.10 M
D/T = 4,83 M
Cb = 0,69
MESIN INDUK = 1600BHP
16
BAB II
PERHITUNGAN RENCANA GARIS
(LINES PLAN)
= 65,40 + 2% 65,40
= 66,708 m
= 66,054 m
Cm = 0,90 + 0,1
Cp = Cb / Cm
= 0,69 / 0,983
17
2.1.5. Coeffisien Garis Air (Cw) Formula Troast Cw
2.1.10 Displacement ( D )
D = Vol Displ x x c
= 2768.074 x 1,025 x 1,004
= 2848.625 Ton
18
2.2. MENENTUKAN LETAK LCB
= (65,4/66,05) x 0,702
= 0,695
= 0,850% x 66,054
= 0,5 x 66,054
= 33,027 m
= 0,5 x 65,40
= 32.7 m
2.2.5 Jarak antara Midship () L Displ dengan Midship () LPP
= 33,027 - 32,7
= 0,327 m
= 0,532 - 0,327
19
GAMBAR 2.1 LCB DISPLACEMENT
20
TABEL 2.2 DIAGRAM NSP
21
2.3. Menurut Diagram NSP dengan luas tiap section (Am)
= 60.302
% Terhadap
No. Ord % Am Fs Hasil Fm Hasil
AP 0.05 3 1 3.02 -10 -30
0.15 9.045 36.181 -325.632
1 4 -9
0.25 15.076 30.151 -241.209
2 2 -8
0.491 29.608 118.434 -829.036
3 4 -7
0.695 41.910 83.820 -502.921
4 2 -6
0.8 48.242 192.967 -964.836
5 4 -5
0.91 54.875 109.750 -439.000
6 2 -4
0.97 58.493 233.973 -701.918
7 4 -3
0.99 59.699 119.398 -238.797
8 2 -2
1 60.302 241.209 -241.209
9 4 -1
2 -4,514.710
1 60.302 120.605
10 2 0 -
1 60.302 241.209 241.209
11 4 1
0.98 59.096 118.192 236.385
12 2 2
0.96 57.890 231.561 694.682
13 4 3
0.94 56.684 113.368 453.473
14 2 4
0.9 54.272 217.088 1,085.441
15 4 5
0.85 51.257 102.514 615.083
16 2 6
0.59 35.578 142.313 996.193
17 4 7
0.33 19.900 39.799 318.396
18 2 8
0.11 6.633 26.533 238.797
19 4 9
0.06 4 4 36
FP 1 10
1 2,525.700 3 4,915.841
22
2.3.1 h = L Displ / 20
= 66,054 / 20
= 3,303
2.3.2 Volume Displacement
V Displ = 1/3 x h x 1
= 1/3 x 3,303 x 2,525.700
= 2,780.543
2.3.3 Letak LCB NSP
LCB NSP = 2 + 3 x h
1
0,11 = - 4,514.710 + 4.915.841 x 3,303
2.525.700
= 0,525
2.3.4 Koreksi Prosentasi Penyimpangan LCB
= 0,00450 x 100 %
23
2.4. Perhitungan prismatik depan (Qf) dan koefisien prismatik belakang
(Qa) berdasarkan tabel "Van Lamerent"
Dimana:
Qf = Koefisien prismatik bagian depan midship Lpp
Qa = Koefisien prismatik bagian belakang midship Lpp
e = Perbandingan jarak LCB terhadap Lpp
e = (LCB Lpp / Lpp) x 100 %
= 0,00359 0,35850 %
Qa = Qf = ± (1,4 + Cp) + e
Dimana:
Qf = Cp + (1,4 + Cp) x e
= 0,709
Qa = Cp - (1.4 + Cp) x e
= 0,694
24
Tabel CSA Lama Menurut Van Lamerent
Am = 60.302
AP 0 0
0.073 4.402
0,25
0.157 9.467
0,5
0.248 14.955
0,75
0.342 20.623
1
0.528 31.840
1,5
0.696 41.970
2
0.829 49.991
2,5
0.92 55.487
3
0.994 59.940
4
1 60.302
5
0.997 60.121
6
0.938 56.564
7
0.855 51.558
7,5
0.727 43.840
8
0.561 33.830
8,5
0.367 22.131
9
0.268 16.161
9,25
0.17 10.251
9,5
0.08 4.824
9,75
0 0
FP
∑ 648.249
25
GAMBAR 2.3 CURVE SELECTIONAL AREA
26
P = LCB Displacement
0,5615 = 0,1940
=
LCB NSP tb = 11,70
Q =
= 0,525 P = 0,233
Q = 0,234
b =
1 1,271.665 3 1,217.166
27
2.4.1 h = Lpp / 10
= 65,40 / 10
= 6,540 m
2.4.2. Volume Displacement pada Main Part
V Displ = 1/3 x LPP/10 x 1
= 1/3 x 6,540 x 1.271.665
= 2.772.229 m3
2.4.3. Letak LCB pada Main Part
= 2 + 3 Lpp
x m
1 10
= -1,174.557 + 1.217.166 x 6,540
1.271.665 10
= 0,219 m
0,5
AP 0.863 4 3.452 1 3.452
1 5.178 2 6.904
E = Lwl - Lpp
2
= 66,7080 - 65,400
2
= 0,6540
2.4.5. Volume Cant Part
= 1/3 x e x
= 1,129
28
2.4.6. LCB Cant Part Terhadap AP
= 2
x e
1
= 6.904 x 0,6540
5,178
= 0,872 m
= ½ x 65,40 + 0,872
= 33,572 m
= 2.772.229 + 1,129
= 2,773.357 m3
29
2.5. KOREKSI HASIL PERHITUNGAN
= 0,002584
= 0,00003 x 100%
30
2.7. Perhitungan Luas Bidang Garis Air
31
GAMBAR 2.4 BENTUK GARIS AIR
32
2.7.1. Luas Garis Air Pada Main Part
AWL mp = 2 x 1/3 x Lpp / 10 x
= 2 x 0,3 x 65,40 / 10 x 154.861
2
=675.192 m
2.7.2. Rencana Bentuk Garis Air pada Cant Part
= 675.192 + 11,5935
= 686.785 m2
33
2.7.6. Koreksi Luas Garis Air
= AWL Awal - AWL Total x 100 %
AWL Awal
= 0,0029 x 100%
2.8.2. Perhitungan
2.8.2.1 Luas Trapesium AECD
= 1/2 B x 1/2 {T + (T -A)}
= 1/2 B x 1/2 (4,83) x ( T - a)
= 6,35 x 1/2 (4,83) x (4,83 -0,127 )
= 30.267 m2
34
2.8.2.2. Luas AFHEDA
= 1/2 Luas Midship
= 1/2 x B x T x Cm
= 0,50 x 12,70 x 4,83 x 0,983
= 30,151 m2
Luas FCG
0,116 = 0,178 R2
R2 = 0,653
R = 0,808
35
Gambar 2.5. Radius Bilga
2.9. MERENCANAKAN BENTUK BODY PLAN
2.9.1. Merencanakan bentuk body plan adalah Merencanakan atau
membuat bentuk garis air lengkung pada potongan ordinat.
2.9.2. Langkah-langkah
Membuat empat persegi panjang dengan dengan sisi 1/2 B
dan T
Pada garis air T di ukurkan garis b yang besarnya : 1/2 Luas
Station di bagi T
Dibuat persegi panjang ABCD
Di ukurkan pada garis air T garis Y = 1/2 lebar garis air
pada station yang bersangkutan
Dari titik E kita merencanakan bentuk station sedemikian
sehingga luas ODE : luas OAB
letak titik O dari station-station harus merupakan garis
lengkung yang stream line.
Setelah bentuk station selesai di buat, di lakukan
pengecekan volume displacement Dari bentuk-bentuk
station.
Kebenaran dari lengkung-lengkung dapat di cek dengan
menggunakan Planimeter.
36
T = 4,83 m
2T = 9,66 m
No. Ord Y = 1/2 B b = ls/2t Luas station
AP 2.950 0.179 1.726
0,25 4.180 0.456 4.401
0,5 4.650 0.980 9.466
0,75 4.950 1.548 14.953
1 5.270 2.135 20.620
1,5 5.750 3.296 31.835
2 6.060 4.344 41.964
2,5 6.250 5.174 50.983
3 6.320 5.742 55.470
4 6.400 6.204 59.931
5 6.400 6.242 60.293
6 6.400 6.223 60.112
37
No. Ord Luas Station FS Hasil
2 41.964 1 41.964
4 59.931 4 239.724
5 60.293 2 120.586
6 60.112 4 240.448
7 56.555 1.5 84.833
7.5 51.550 2 103.100
8 43.833 1 43.833
38
Gambar 2.6. Body Plan
39
2.9.2.3. Volume displacement perhitungan
= Lpp x B x T x Cb
= 65.40 x 12.70 x 4.83 x 0.69
2
= 2768.074 m
2.9.2.4. Volume Displacement Perencanaan
= 1-3 x Lpp / 10 x 1
2.9.2.5. e (LWL-LPP)/2
= ( 66.708 - 65.40 ) / 2
= 0.654
2.9.2.6 Volume Cant Part
= 1/3 x e x ∑
= 1/3 x 0.654 x 5.178
= 1.129
2.9.2.7 Volume Displacement Total
= Volume MP + Volume CP
= 2740.086 + 1.129
= 2741.214
2.9.2.8. Koreksi Penyimpangan Volume Displacement Body Plan
V Displ Perencanaan Awal - V Displ Total
= V Displ Total x100%
= 2742.074 - 2741.214 x 100%
2742.074
40
2.10. Perhitungan Chamer, Sheer, Dan Bangunan Atas
2.10.1. Chamber :
= 1 / 50 x B m
= 1 / 50 x 12,70
= 0,254 M = 254 mm
2.10.2. Tinggi Bulwark = 1,0 m
2.10.3. Perhitungan Sheer
2.10.3.1. Bagian Buritan (Belakang)
2.10.3.1.1. AP = 25 ( L / 3 + 10 )
= 25 ( 65,40 / 3 + 10 )
= 795,00 mm 0,80 m
2.10.3.1.2. 1/6 Lpp dari AP
= 11,1 ( L / 3 + 10 )
= 11,1 ( 65,40 / 3 + 10 )
= 352,98 mm 0,35 m
2.10.3.1.3. 1/3 Lpp dari Ap
= 2,8 ( L / 3 + 10 )
= 2,8 ( 65,40 / 3 + 10 )
= 89,04 mm 0,09 m
2.10.3.2. Bagian Midship (Tengah) = 0 mm
2.10.3.3. Bagian Haluan (Depan)
2.10.3.3.1. FP = 50 ( L / 3 + 10 )
= 50 ( 65,40 / 3 + 10 )
= 1590,00 mm 1,59 m
2.10.3.3.2. 1/6 Lpp dari FP
= 22,2 ( L / 3 + 10 )
= 22,2 ( 65,40 / 3 + 10 )
= 705,96 mm 0,71 m
2.10.3.3.3. 1/3 Lpp dari FP
= 5,6 ( L / 3 + 10 )
= 5,6 ( 65,40 / 3 + 10 )
= 178,08 mm 0,18 m
41
Untuk Lpp = 65,40 m
maka 0,60 x 109 gading = 65.40
2.11.2. Poop Deck (Geladak Kimbul)
Panjang poop deck : (20 % - 30 %) Lpp
Panjang = 25% x Lpp
= 25% 65,40
= 16.35 diambil 15 m
Sedang tinggi Poop Deck 2,0 s / d 2,4 m diambil 2,2 m dari main deck
bentuk disesuaikan dengan bentuk buttock line. Jarak gading pada poop
deck
Panjang poop deck = 15.0 m
6 x 0,60 gading = 36 x 19 x 0.60 = 11.4
2.11.3. Fore Castle Deck (Deck Akil)
Panjang fore castle deck : (8 % - 15 %) Lpp
Panjang = 10% x Lpp
= 10% x 65.40
= 6.54
Tinggi deck akil (2,0 - 2,4)
diambil 2,2 m (dari main deck)
2.11.4.Jarak Gading Memanjang
A = (2xLpp) + 620 mm
= 130.8 + 620 mm
= 750.8 mm diambil 0.7508 m
42
Gambar 2.7 Chamber
43
Gambar 2.8 Sherr Plan
44
Gambar 2.9 Rencana Jarak Gading
45
2.11.5.Jarak sekat tubrukan
Jarak minimum =
0,05 x LPP
=
0,05 x 65,4
=
3,27 m
Jarak maximum =
0,08x LPP
=
0,08 x 65.4
=
5,232m
3,27 + 5,23
Jarak sekat tubrukan =
2
= 4,25 m
2.12. PERHITUNGAN UKURAN DAUN KEMUDI
Perhitungan ukuran daun kemudi
Perhitungan Luas Daun kemudi menurut BKI jilid II, 2001 14 - 1
A = C1 x C2 x C3 x C4 x 1,75 x L x T (m2)
100
Luas daun kemudi dalam
A = m2
L = Panjang Kapal = 65,40 m
T = Sarat Kapal = 4,83 m
C1 = Faktor untuk type kapal = 1
C2 = Faktor untuk type kemudi = 1
C3 = Faktor untuk profil kemudi = 1
C4 = Faktor untuk rancangan kemudi = 1
untuk kemudi dengan jet propeller
Jadi
A = 1 x 1,0 x 1 x 1 x 1,75 x 65,4 x 4,83
100
= 5.528 m2
Koreksi Luas Daun Kemudi (Buku Perlengkapan Kapal ITS hal 51)
46
2.12.1. Ukuran Daun Kemudi
A = h .b Dimana: h = Tinggi daun kemudi
b = Lebar daun kemudi
Menurut ketentuan perlengkapan kapal ITS halaman 53 harga
perbandingan h/b = 1,5 sampai 2
diambil 1,5 sehingga :
A = 1,6 x b
A = 1,6 x b x b
2
5,013 = 1,6 b
2
b = 5,528 / 1,6 = 3,45 b = 1.859
h = 5,528 / 1,859
= 2,974 m
Menurut Buku Perlengkapan Kapal Halaman 52 sec. 11.9
Luas bagian yang dibalansir dianjurkan < 23 %, diambil 20 %
A' = 20% x A
= 0,2 x 5,528
= 1,106 m2
Perhitungan lebar bagian yang dibalancir pada potongan sembarang
horizontal
b' = 30% x b
= 0,3 x 1,86
= 0,558 m
47
Gambar 2.10. Daun Kemudi
48
2.12.2. Perhitungan Sepatu Kemudi
Ø. Menurut BKI 2001 Vol. II (hal. 14 - 3 Sec.B.1.1) tentang Gaya
Kemudi adalah : Cr = 132 x A x V2 x K1 x K2 x K3 x Kt (N)
Dimana :
A = Aspek Ratio h2 / A :
= 2,9742 / 5,528= 1,6
V = Kecepatan dinas kapal = 12,00
K1 = A + 2
3
= 1,6 + 2
3
= 1,20
K2 = Koefisien yang tergantung dari kapal
= 1,1
K3 = 1,15 Untuk kemudi dibelakang propeller
Kt = 1,0 (Normal)
Jadi :
Cr = 132 x A x V2 x K1 x K2 x K3 x Kt (N)
Cr = 132 x 5,52x 144,00 x 1,20 x 1,1 x 1,15 x 1,0
= 159503.833 N
Ø. Modulus Sepatu Kemudi
Modulus penampang dari sepatu kemudi terhadap sumbu z, menurut
BKI2001 Volume II. Hal. 13.3
Dimana :
Bl = Cr / 2
Bl = 159503.833/ 2 = 9751.916 N
49
x = 0,5 x L50 (x maximum)
= 159503.833
2,974 x 103
= 53.633 N/m
Cr
L50 =
Pr x 103
L50 = 159503.833
53.633 x103
= 2.97 m
X min = 0,5 x L50
= 0,5 x 2,97
= 1,487 m
k = Faktor bahan = 1,0
Wz = Bl x X x k
80
= 79751.916 x 1,487 X 1,0
80
= 1482.390 cm3 S2
Wy = 1/3 x Wz
= 0,333 x 1482.390
= 494.130 cm3
Perencanaan profil sepatu kemudi dengan plat dnegan
ukuran sebagai berikut
Tinggi (h) = 240 mm = 24 cm
Tebal (s) = 60 mm = 6.0 cm
Lebar = 201 mm = 20.1 cm
50
No B H F=bxh a Fxa2 Iz = 1/12 x b x h3
S1 7157.160 S2 3315.6000
Iz = +
= 7157.16 + 3315.600
= 10472.760 cm4
Wz ' = Iz / a
= 10472.760 / 8,35
= 1485.498
Wz < Wz '
1482.390 < 1485.50 cm3 (Memenuhi)
Koreksi Wz = Wz Rencana - Wz Perhitungan x 100 %
Wz Perhitungan
= 1482390 - 1485.498 x 100 %
1485.498
= 0,209 < 0,5 % (Memenuhi)
51
Gambar 2.11. Daun Kemudi
52
2.12.3. Stren Clearance
= 1,570 m 0,156975
53
Gambar 2.12. Stern & Clearance
54
Gambar 2.13 Stem Ship
55
Gambar 2.14 Stem Ship
56