I. PEKERJAAN PERSIAPAN Rp. 24,500,000.00
II. PEKERJAAN LANTAI I Rp. 1,445,305,490.53
A. PEKERJAAN GALIAN TANAH DAN PONDASI Rp. 96,955,110.02
B. PEKERJAAN BETON BERTULANG Rp. 580,711,988.91
C. PEKERJAAN PASANGAN DAN PLESTERAN Rp. 137,243,325.46
D. PEKERJAAN LANTAI DAN DINDING Rp. 108,324,380.90
E. PEKERJAAN ATAP Rp. 96,000,000.00
F. PEKERJAAN PINTU, JENDELA DAN VENTILASI Rp. 206,250,000.00
G. PEKERJAAN PENGECATAN Rp. 32,370,685.24
H. PEKERJAAN MEKANIKAL ELEKTRIKAL Rp. 108,450,000.00
I. PEKERJAAN SANITAIR Rp. 24,000,000.00
L. PEKERJAAN LAIN - LAIN Rp. 55,000,000.00
III. PEKERJAAN LANTAI II Rp. 899,382,826.57
A PEKERJAAN BETON BERTULANG Rp. 287,823,819.96
B PEKERJAAN PASANGAN DAN PLESTERAN Rp. 225,990,254.92
C. PEKERJAAN LANTAI DAN DINDING Rp. 16,930,544.38
D. PEKERJAAN ATAP Rp. 101,111,318.50
E. PEKERJAAN PINTU, JENDELA DAN VENTILASI Rp. 129,400,000.00
G. PEKERJAAN PENGECATAN Rp. 45,743,133.82
H. PEKERJAAN MEKANIKAL ELEKTRIKAL Rp. 13,310,000.00
I. PEKERJAAN SANITAIR Rp. 46,073,755.00
J. PEKERJAAN LAIN - LAIN Rp. 33,000,000.00
IV. PEKERJAAN FINISHING Rp. 200,000.00
TOTAL : Rp. 2,369,388,317.10
PPN 10% : Rp. 236,938,831.71
GRAND TOTAL : Rp. 2,606,327,148.81
DIBULATKAN : Rp. 2,606,327,000.00

Terbilang : DUA MILYAR ENAM RATUS ENAM JUTA TIGA RATUS DUA PULUH TUJUH RIBU RUPIAH

Pidie Jaya, April 2017


DISPERINDAGKOP KAB. PIDIE JAYA Banda Aceh, 20 April 2018
PENGGUNA ANGGARAN PT. POLADA MUTIARA ACEH
Direktur Utama MUHAJIR

RAPIATI, SE
Pembina TK 1 / Nip. 19640208 199308 2 001
DAFTAR KUANTITAS DAN HARGA
PEKERJAAN : KONSTRUKSI FISIK PEMBANGUNAN PERTOKOAN TRINGGADENG 2 LANTAI
LOKASI : TRIENGGADENG - KAB. PIDIE JAYA
SKPA : DINAS PERINDUSTRIAN DAN PERDAGANGAN ACEH
TAHUN ANGGARAN : 2018

HARGA SATUAN JUMLAH HARGA


NO. URAIAN PEKERJAAN VOLUME SAT. ANALISA
( Rp.) ( Rp.)
1 2 3 4 5 6 7
I. PEKERJAAN PERSIAPAN
1 Pembuatan Pagar Pengaman Sementara 120.00 M1 Taksir 100,000.00 12,000,000.00
2 Pengukuran dan Pemasangan Bowplank 1.00 ls Taksir 2,000,000.00 2,000,000.00
3 Bongkar Bangunan Lama 11 Pintu 1.00 ls Taksir 5,000,000.00 5,000,000.00
4 Demobilisasi Hasil Bongkaran Bangunan Lama 1.00 ls Taksir 2,000,000.00 2,000,000.00
5 Papan Nama Proyek 1.00 ls Taksir 500,000.00 500,000.00
6 Dokumentasi dan Pelaporan 1.00 ls Taksir 3,000,000.00 3,000,000.00
Sub Total 24,500,000.00
II. PEKERJAAN LANTAI I
A. PEKERJAAN GALIAN TANAH DAN PONDASI
1 Galian Tanah Pondasi Tapak 107.02 m3 AHSP PU A.2.3.1.1.a 77,366.25 8,279,426.61
2 Galian Tanah Pondasi Menerus 31.20 m3 AHSP PU A.2.3.1.1 63,106.25 1,968,915.00
3 Urungan Kembali Galian Tanah Pondasi Tapak - TP1 26.75 m3 AHSP PU A.2.3.1.9 29,225.53 781,899.70
4 Urungan Kembali Galian Tanah Pondasi Menerus 7.80 m3 AHSP PU A.2.3.1.9 29,225.53 227,959.10
5 Urungan Kembali Galian Tanah Pondasi Trap Tangga 1.25 m3 AHSP PU A.2.3.1.9 29,225.53 36,450.46
6 Urungan Pasir Alas Pondasi Tapak - TP1 1.95 m3 AHSP PU A.2.3.1.11 149,304.50 291,143.78
7 Urungan Pasir Alas Pondasi Menerus t = 5 cm 8.64 m3 AHSP PU A.2.3.1.11 149,304.50 1,289,990.88
8 Urungan Pasir Alas Pondasi Trap Tangga t = 5 cm 0.53 m3 AHSP PU A.2.3.1.11 149,304.50 79,806.24
9 Pas. Batu Kosong /Aanstamping Pondasi Tapak t = 10 cm 5.62 m3 AHSP PU A.3.2.1.9 352,005.57 1,976,863.28
10 Pondasi Tapak 120 x 120 cm (TP1)
- Beton Cor 11.23 m3 AHSP PU A.4.1.1.8 1,051,691.49 11,812,598.81
- Besi Beton ulir 1,823.42 kg AHSP PU A.4.1.1.17.a 14,484.83 26,411,942.78
- Bekisting 37.44 m2 AHSP PU A.4.1.1.20 97,240.21 3,640,673.28
- Pembongkaran dan Penyiraman 11.23 m3 Taksir 50,000.00 561,600.00
11 Pas. Batu Kosong /Aanstamping Pondasi Menerus t = 10 cm 15.36 m3 AHSP PU A.3.2.1.9 352,005.57 5,406,805.56
12 Pas. Batu Kali 1 : 4 43.20 m3 AHSP PU A.3.2.1.2 770,770.25 33,297,274.80
13 Pas. Pondasi Rolaag 1 : 2 Trap Tangga 6.97 m2 AHSP PU A.4.4.1.7 127,905.88 891,759.76
Sub total 96,955,110.02
B. PEKERJAAN BETON BERTULANG
1 Kolom Pedestal 25/35 - K1
- Beton Cor 4.27 m3 AHSP PU A.4.1.1.8 1,051,691.49 4,486,121.51
- Besi Beton Ulir 849.42 kg AHSP PU A.4.1.1.17.a 14,484.83 12,303,700.05
- Besi Beton Polos 331.75 kg AHSP PU A.4.1.1.17 13,277.33 4,404,747.26
- Bekisting 58.50 m2 AHSP PU A.4.1.1.22 176,734.28 10,338,955.43
- Pembongkaran dan Penyiraman 4.27 m3 Taksir 50,000.00 213,281.25
2 Sloof 25/35 - SL1
- Beton Cor 19.80 m3 AHSP PU A.4.1.1.8 1,051,691.49 20,820,204.95
- Besi Beton Ulir 1,948.10 kg AHSP PU A.4.1.1.17.a 14,484.83 28,217,887.58
- Besi Beton Polos 1,093.68 kg AHSP PU A.4.1.1.17 13,277.33 14,521,144.81
- Bekisting 170.73 m2 AHSP PU A.4.1.1.21 105,970.33 18,091,785.30
- Pembongkaran dan Penyiraman 19.80 m3 Taksir 50,000.00 989,843.75
3 Kolom 25/35 - K1
- Beton Cor 12.97 m3 AHSP PU A.4.1.1.8 1,051,691.49 13,637,809.39
- Besi Beton Ulir 1,585.58 kg AHSP PU A.4.1.1.17.a 14,484.83 22,966,906.76
- Besi Beton Polos 566.42 kg AHSP PU A.4.1.1.17 13,277.33 7,520,547.74
- Bekisting 177.84 m2 AHSP PU A.4.1.1.22 176,734.28 31,430,424.50
- Pembongkaran dan Penyiraman 12.97 m3 Taksir 50,000.00 648,375.00
4 Balok Latai 18/20 - BLP
- Beton Cor 3.97 m3 AHSP PU A.4.1.1.5 972,405.13 3,859,475.98
- Besi Beton Polos 604.92 kg AHSP PU A.4.1.1.17 13,277.33 8,031,759.27
- Bekisting 63.95 m2 AHSP PU A.4.1.1.23 182,778.28 11,687,757.01
- Pembongkaran dan Penyiraman 3.97 m3 Taksir 50,000.00 198,450.00
HARGA SATUAN JUMLAH HARGA
NO. URAIAN PEKERJAAN VOLUME SAT. ANALISA
( Rp.) ( Rp.)
1 2 3 4 5 6 7
5 Balok Latai 13/15 - BLT1
- Beton Cor 2.15 m3 AHSP PU A.4.1.1.5 972,405.13 2,085,809.01
- Besi Beton Polos 366.01 kg AHSP PU A.4.1.1.17 13,277.33 4,859,617.79
- Bekisting 33.00 m2 AHSP PU A.4.1.1.23 182,778.28 6,031,683.19
- Pembongkaran dan Penyiraman 2.15 m3 Taksir 50,000.00 107,250.00
6 Balok Lantai 25/35 - B1
- Beton Cor 15.41 m3 AHSP PU A.4.1.1.8 1,051,691.49 16,206,565.85
- Besi Beton Ulir 1,663.75 kg AHSP PU A.4.1.1.17.a 14,484.83 24,099,127.59
- Besi Beton Polos 2,315.72 kg AHSP PU A.4.1.1.17 13,277.33 30,746,567.05
- Bekisting 203.68 m2 AHSP PU A.4.1.1.23 182,778.28 37,228,279.73
- Pembongkaran dan Penyiraman 15.41 m3 Taksir 50,000.00 770,500.00
7 Balok Lantai 18/20- B2
- Beton Cor 3.42 m3 AHSP PU A.4.1.1.8 1,051,691.49 3,592,241.59
- Besi Beton Polos 1,514.48 kg AHSP PU A.4.1.1.17 13,277.33 20,108,195.37
- Bekisting 86.09 m2 AHSP PU A.4.1.1.23 182,778.28 15,735,016.43
- Pembongkaran dan Penyiraman 3.42 m3 Taksir 50,000.00 170,784.00
8 Plat Lantai t = 12 cm
- Beton Cor 49.15 m3 AHSP PU A.4.1.1.8 1,051,691.49 51,692,740.09
- Besi Beton Polos 6,032.85 kg AHSP PU A.4.1.1.17 13,277.33 80,100,083.57
- Bekisting 320.26 m2 AHSP PU A.4.1.1.24 219,667.61 70,350,750.11
- Pembongkaran dan Penyiraman 49.15 m3 Taksir 50,000.00 2,457,600.00
Sub Total 580,711,988.91
C. PEKERJAAN PASANGAN DAN PLESTERAN
1 Pas. Bata Tebal 1/2 Camp. 1 : 2 33.95 m2 AHSP PU A.4.4.1.7 127,905.88 4,342,404.46
2 Pas. Bata Tebal 1/2 Camp. 1 : 4 485.90 m2 AHSP PU A.4.4.1.9 114,833.25 55,797,476.18
3 Plesteran Dinding 1 : 2 67.90 m2 AHSP PU A.4.4.2.2 67,556.29 4,587,072.09
4 Plesteran Dinding 1 : 4 971.80 m2 AHSP PU A.4.4.2.4 60,847.65 59,131,746.27
5 Acian Beton Bertulang 377.73 m2 AHSP PU A.4.4.2.27 35,434.38 13,384,626.47
Sub total 137,243,325.46
D. PEKERJAAN LANTAI DAN DINDING
1 Urungan Tanah Bawah Lantai Ruangan 164.50 m3 AHSP PU A.2.3.1.11.a 87,342.50 14,367,841.25
2 Urungan Tanah Bawah Selasar 44.80 m3 AHSP PU A.2.3.1.11.a 87,342.50 3,912,944.00
3 Urungan Pasir Bawah Lantai 45.40 m3 AHSP PU A.2.3.1.11 149,304.50 6,778,424.30
4 Rabat Beton Bawah Lantai 22.72 m3 AHSP PU A.4.1.1.1 864,319.46 19,637,338.23
5 Lantai Keramik Ruangan 40 x 40 Cm Polished 329.49 m2 AHSP PU A.4.4.3.9 127,897.25 42,141,095.12
6 Lantai Keramik Selasar 40 x 40 Cm Unpolished 128.00 m2 AHSP PU A.4.4.3.9 127,897.25 16,370,848.00
7 Lantai Keramik Tangga Selasar 40 x 40 Cm Unpolihed 40.00 m2 AHSP PU A.4.4.3.9 127,897.25 5,115,890.00
Sub Total 108,324,380.90
E. PEKERJAAN ATAP
1 Pasang Kanopy Hollow Selasar + Atap Spandek 0,3(Bentuk dan 192.00 m2 Taksir 500,000.00 96,000,000.00
Ukuran sesuai Gambar)
Sub Total 96,000,000.00
F. PEKERJAAN PINTU, JENDELA DAN VENTILASI
1 Pintu folding gate 30.00 Unit Taksir 6,500,000.00 195,000,000.00
Sesuai Gambar)
2 Ventilasi Kerawang Terpasang (Di Atas Pintu Lipat) 150.00 unit Taksir 75,000.00 11,250,000.00
Sub Total 206,250,000.00
G. PEKERJAAN PENGECATAN
1 Pengecatan Dinding dan Beton Bertulang 3 x (L/D) 1,349.30 m2 AHSP PU A.4.7.1.10 23,990.73 32,370,685.24
Sub Total 32,370,685.24
H. PEKERJAAN MEKANIKAL ELEKTRIKAL
a. pemasanagan meteran 4 ampare 22.00 unit Taksir 4,000,000.00 88,000,000.00
b. Lampu HE 45 Watt 22.00 bh Taksir 65,000.00 1,430,000.00
c. Lampu HE 24 Watt 30.00 bh Taksir 45,000.00 1,350,000.00
d. Instalasi Titik Lampu termasuk kabel (terpasang) 52.00 bh Taksir 160,000.00 8,320,000.00
e. Saklar Ganda 22.00 bh Taksir 60,000.00 1,320,000.00
f. Stop Kontak 22.00 bh Taksir 45,000.00 990,000.00
l. Instalasi Titik Kontak termasuk kabel (terpasang) 44.00 bh Taksir 160,000.00 7,040,000.00
Sub Total 108,450,000.00
HARGA SATUAN JUMLAH HARGA
NO. URAIAN PEKERJAAN VOLUME SAT. ANALISA
( Rp.) ( Rp.)
1 2 3 4 5 6 7
I. PEKERJAAN SANITAIR
1 Septictank dan Resapan Cincin Sumur Terpasang 8.00 unit Taksir 3,000,000.00 24,000,000.00
Sub Total 24,000,000.00
L. PEKERJAAN LAIN - LAIN `
1 Pasang Tangga (Besi Hollow + Accesories + Pengecatan Sesuai 22.00 unit Taksir 2,500,000.00 55,000,000.00
Gambar)
Sub Total 55,000,000.00
III. PEKERJAAN LANTAI II
A PEKERJAAN BETON BERTULANG
1 Kolom 25/35 - K1
- Beton Cor 11.94 m3 AHSP PU A.4.1.1.8 1,051,691.49 12,561,140.23
- Besi Beton Ulir 1,415.70 kg AHSP PU A.4.1.1.17.a 14,484.83 20,506,166.75
- Besi Beton Polos 964.78 kg AHSP PU A.4.1.1.17 13,277.33 12,809,724.17
- Bekisting 163.80 m2 AHSP PU A.4.1.1.22 176,734.28 28,949,075.20
- Pembongkaran dan Penyiraman 11.94 m3 Taksir 50,000.00 597,187.50
2 Kolom 13/13
- Beton Cor 4.85 m3 AHSP PU A.4.1.1.5 972,405.13 4,716,456.63
- Besi Beton Polos 1,027.79 kg AHSP PU A.4.1.1.17 13,277.33 13,646,275.31
- Bekisting 37.31 kg AHSP PU A.4.1.1.22 176,734.28 6,593,956.02
- Pembongkaran dan Penyiraman 4.85 m2 Taksir 176,734.28 857,214.28
3 Balok Latai 13/15 - BLT1
- Beton Cor 6.14 m3 AHSP PU A.4.1.1.5 972,405.13 5,972,998.54
- Besi Beton Polos 1,001.17 kg AHSP PU A.4.1.1.17 13,277.33 13,292,822.29
- Bekisting 47.25 m2 AHSP PU A.4.1.1.23 182,778.28 8,636,273.65
- Pembongkaran dan Penyiraman 6.14 m3 Taksir 50,000.00 307,125.00
4 Ring Balok 20/25 RB1
- Beton Cor 10.20 m3 AHSP PU A.4.1.1.8 1,051,691.49 10,727,253.19
- Besi Beton Polos 1,391.52 kg AHSP PU A.4.1.1.17 13,277.33 18,475,727.02
- Bekisting 142.80 m3 AHSP PU A.4.1.1.23 182,778.28 26,100,738.15
- Pembongkaran dan Penyiraman 10.20 m3 Taksir 50,000.00 510,000.00
5 Ring Balok 13/20 RB2
- Beton Cor 7.28 m3 AHSP PU A.4.1.1.8 1,051,691.49 7,656,314.04
- Besi Beton Polos 1,468.54 kg AHSP PU A.4.1.1.17 13,277.33 19,498,335.96
- Bekisting 112.00 m3 AHSP PU A.4.1.1.23 182,778.28 20,471,167.17
- Pembongkaran dan Penyiraman 7.28 m3 Taksir 50,000.00 364,000.00
6 Top Gevel 13/15
- Beton Cor 2.65 m3 AHSP PU A.4.1.1.5 972,405.13 2,578,818.42
- Besi Beton Polos 429.07 kg AHSP PU A.4.1.1.17 13,277.33 5,696,880.59
- Bekisting 20.40 m2 AHSP PU A.4.1.1.23 182,778.28 3,728,676.88
- Pembongkaran dan Penyiraman 2.65 m3 Taksir 50,000.00 132,600.00
7 Plat Daag t = 10 cm
- Beton Cor 9.22 m3 AHSP PU A.4.1.1.8 1,051,691.49 9,692,388.77
- Besi Beton Polos 1,029.70 kg AHSP PU A.4.1.1.17 13,277.33 13,671,608.44
- Bekisting 76.80 m2 AHSP PU A.4.1.1.23 182,778.28 14,037,371.78
- Pembongkaran dan Penyiraman 9.22 m3 Taksir 50,000.00 460,800.00
8 Plat Kanopy t = 7 cm
- Beton Cor 0.85 m3 AHSP PU A.4.1.1.5 972,405.13 827,711.25
- Besi Beton Polos 77.82 kg AHSP PU A.4.1.1.17 13,277.33 1,033,294.54
- Bekisting 12.16 m2 AHSP PU A.4.1.1.24 219,667.61 2,671,158.19
- Pembongkaran dan Penyiraman 0.85 m3 Taksir 50,000.00 42,560.00
Sub Total 287,823,819.96
B PEKERJAAN PASANGAN DAN PLESTERAN
1 Pas. Bata Tebal 1/2 Camp. 1 : 2 111.50 m2 AHSP PU A.4.4.1.7 127,905.88 14,261,505.06
2 Pas. Bata Tebal 1/2 Camp. 1 : 4 835.50 m2 AHSP PU A.4.4.1.9 114,833.25 95,943,180.38
3 Plesteran Dinding 1 : 2 111.50 m2 AHSP PU A.4.4.2.2 67,556.29 7,532,526.34
4 Plesteran Dinding 1 : 4 1,671.00 m2 AHSP PU A.4.4.2.4 60,847.65 101,676,423.15
5 Acian Beton Bertulang 185.60 m2 AHSP PU A.4.4.2.27 35,434.38 6,576,620.00
Sub total 225,990,254.92
C. PEKERJAAN LANTAI DAN DINDING
1 Acian Lantai II 477.80 m2 AHSP PU A.4.4.2.27 35,434.38 16,930,544.38
Sub Total 16,930,544.38
HARGA SATUAN JUMLAH HARGA
NO. URAIAN PEKERJAAN VOLUME SAT. ANALISA
( Rp.) ( Rp.)
1 2 3 4 5 6 7
D. PEKERJAAN ATAP
1 Kuda - kuda Baja Ringan Multi Truss dengan kelengkapan terpasan 412.80 m2 Taksir 120,000.00 49,536,000.00
- Kuda - Kuda Baja Ringan c 100
- Gording Baja Ringan c 45
- Sokong Baja Ringan c 100
2 Pasang Atap seng Spandek 0,3 mm 421.44 m2 AHSP PU A. 4.5.2.33.a 112,004.25 47,203,071.12
3 Pasang Listplank Kayu 2.5/20 cm 48.00 m' AHSP PU A.4.6.1.21 91,088.49 4,372,247.38
Sub Total 101,111,318.50
HARGA SATUAN JUMLAH HARGA
NO. URAIAN PEKERJAAN VOLUME SAT. ANALISA
( Rp.) ( Rp.)
1 2 3 4 5 6 7
E. PEKERJAAN PINTU, JENDELA DAN VENTILASI
1 Pintu dan jendela Type P1 22.00 unit Taksir 2,700,000.00 59,400,000.00
Kusen Alumunium dan Daun Pintu Panel lengkap terpsaang
2 Pintu KM/WC Tipe P4 22.00 unit Taksir 600,000.00 13,200,000.00
Daun Pintu PVC
3 Jendela Type J1 8.00 unit Taksir 2,000,000.00 16,000,000.00
Dengan perangkat tambahan :
-Kusen Alumunium 40.75mm
-Ambang Kaca
-Kaca Polos 5 mm
-Hak Angin
-Tarikan Jendela dan Jalusi
-Pacok Jendela dan Jalusi
4 Ventilasi Type V3 34.00 unit Taksir 1,200,000.00 40,800,000.00
Dengan perangkat tambahan :
-Kusen Alumunium 40.75mm
-Ambang Kaca
-Kaca Polos 5 mm
Sub Total 129,400,000.00
G. PEKERJAAN PENGECATAN
1 Pengecatan Dinding dan Beton Bertulang 3 x (L/D) 1,856.60 m2 AHSP PU A.4.7.1.10 23,990.73 44,541,180.04
2 Cat List Plank 24.00 m2 AHSP PU A.4.7.1.4 50,081.41 1,201,953.78
Sub Total 45,743,133.82
H. PEKERJAAN MEKANIKAL ELEKTRIKAL
1 PPL
a. Lampu HE 24 Watt 22.00 bh Taksir 45,000.00 990,000.00
b. Instalasi Titik Lampu termasuk kabel (terpasang) 22.00 bh Taksir 160,000.00 3,520,000.00
c. Saklar Tunggal 22.00 bh Taksir 35,000.00 770,000.00
d. Stop Kontak 22.00 bh Taksir 45,000.00 990,000.00
e. Instalasi Titik Kontak termasuk kabel (terpasang) 44.00 bh Taksir 160,000.00 7,040,000.00
Sub Total 13,310,000.00
I. PEKERJAAN SANITAIR
1 Pasang Kloset Duduk 22.00 unit Taksir 500,000.00 11,000,000.00
2 Pasang Floor Drain Steinless Steel 22.00 unit AHSP PU A.4.5.1.14 65,176.25 1,433,877.50
3 Pasang Kran Air Steinless Steel 22.00 bh AHSP PU A.4.5.1.19 88,176.25 1,939,877.50
4 Pemasukan Jaringan Instalasi Air Bersih PDAM + Mesin Air 22.00 Pkt Taksir 1,100,000.00 24,200,000.00
5 Jaringan Pipa Instalasi Air Kotor 1.00 ls Taksir 3,000,000.00 3,000,000.00
6 Jaringan Pipa Instalasi Air Bersih 1.00 ls Taksir 2,500,000.00 2,500,000.00
7 Jaringan Pipa Instalasi Air Buangan dan Air Hujan 1.00 ls Taksir 2,000,000.00 2,000,000.00
Sub Total 46,073,755.00
J. PEKERJAAN LAIN - LAIN
1 Relif Dinding dan penebalan Dinding Sesuai Gambar 22.00 ls Taksir 500,000.00 11,000,000.00
2 Realling Besi Hollow Balkon Terpasang 22.00 Unit Taksir 1,000,000.00 22,000,000.00
Sub Total 33,000,000.00
IV. PEKERJAAN FINISHING
1 Pembersihan Akhir Lapangan 1.00 ls Taksir 200,000.00 200,000.00
Sub Total 200,000.00
DAFTAR KAUNTITAS DAN HARGA

Jenis Pekerjaan : Galian Tanah Biasa Sedalam 1 Meter


Satuan / Unit : M3
Analisa : AHSP PU A.2.3.1.1

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja Galian Tanah OH 0.7500 70,000.00 52,500.00
2 Mandor OH 0.0250 95,000.00 2,375.00
Jumlah Tenaga Kerja 54,875.00
B. BAHAN
Jumlah Bahan -
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 54,875.00
E Overhead & Profit 15.0% X D 8,231.25
F Harga Satuan Pekerjaan ( D + E ) 63,106.25

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Galian Tanah Biasa Sedalam 2 Meter


Satuan / Unit : M3
Analisa : AHSP PU A.2.3.1.1.a

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja Galian Tanah OH 0.9000 70,000.00 63,000.00
2 Mandor OH 0.0450 95,000.00 4,275.00
Jumlah Tenaga Kerja 67,275.00
B. BAHAN
Jumlah Bahan -
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 67,275.00
E Overhead & Profit 15.0% X D 10,091.25
F Harga Satuan Pekerjaan ( D + E ) 77,366.25

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Mengurug Kembali Galian


Satuan / Unit : M3
Analisa : AHSP PU A.2.3.1.9

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja Galian Tanah OH 0.2500 70,000.00 17,500.00
2 Mandor OH 0.0833 95,000.00 7,913.50
Jumlah Tenaga Kerja 25,414
B. BAHAN
Jumlah Bahan -
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 25,413.50
E Overhead & Profit 15.0% X D 3,812.03
F Harga Satuan Pekerjaan ( D + E ) 29,225.53
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Memadatkan tanah (per 20 cm)


Satuan / Unit : M3
Analisa : AHSP PU A.2.3.1.10

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja Galian Tanah OH 0.5000 70,000.00 35,000.00
2 Mandor OH 0.0500 95,000.00 4,750.00
Jumlah Tenaga Kerja 39,750
B. BAHAN
Jumlah Bahan -
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 39,750.00
E Overhead & Profit 15.0% X D 5,962.50
F Harga Satuan Pekerjaan ( D + E ) 45,712.50

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Timbunan Tanah didatangkan Termasuk Perataan dan Pemadatan


Satuan / Unit : M3
Analisa : AHSP PU - T.14 E

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja Galian Tanah OH 0.5000 70,000.00 35,000.00
2 Mandor OH 0.0500 95,000.00 4,750.00
Jumlah Tenaga Kerja 39,750.00
B. BAHAN
1 Tanah Timbun M3 1.200 45,000.00 54,000.00
Jumlah Bahan 54,000.00
C. PERALATAN
1 Pemadat Timbunan (Stamper) Sewa-Hari 0.050 120,000.00 6,000.00
Jumlah Peralatan 6,000.00
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 99,750.00
E Overhead & Profit 15.0% X D 14,962.50
F Harga Satuan Pekerjaan ( D + E ) 114,712.50

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Urugan Pasir


Satuan / Unit : M3
Analisa : AHSP PU A.2.3.1.11

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja Galian Tanah OH 0.3000 70,000.00 21,000.00
2 Mandor OH 0.0100 95,000.00 950.00
Jumlah Tenaga Kerja 21,950.00
B. BAHAN
1 Pasir Urug M3 1.200 89,900.00 107,880.00
Jumlah Bahan 107,880.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 129,830.00
E Overhead & Profit 15.0% X D 19,474.50
F Harga Satuan Pekerjaan ( D + E ) 149,304.50
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Timbunan Tanah


Satuan / Unit : M3
Analisa : AHSP PU A.2.3.1.11.a

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja Galian Tanah OH 0.3000 70,000.00 21,000.00
2 Mandor OH 0.0100 95,000.00 950.00
Jumlah Tenaga Kerja 21,950.00
B. BAHAN
1 Tanah Timbun M3 1.200 45,000.00 54,000.00
Jumlah Bahan 54,000.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 75,950.00
E Overhead & Profit 15.0% X D 11,392.50
F Harga Satuan Pekerjaan ( D + E ) 87,342.50

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Pondasi Batu Belah / Kali Campuran 1 : 4


Satuan / Unit : M3
Analisa : AHSP PU A.3.2.1.2

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 1.5000 70,000.00 105,000.00
2 Tukang OH 0.7500 95,000.00 71,250.00
3 Kepala Tukang OH 0.0750 100,000.00 7,500.00
4 Mandor OH 0.0750 95,000.00 7,125.00
Jumlah Tenaga Kerja 190,875.00
B. BAHAN
1 Batu Gunung/ Batu Kali M3 1.200 140,000.00 168,000.00
2 Semen Portland Kg 163.000 1,320.00 215,160.00
3 Pasir Pasang M3 0.520 185,000.00 96,200.00
Jumlah Bahan 479,360.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 670,235.00
E Overhead & Profit 15.0% X D 100,535.25
F Harga Satuan Pekerjaan ( D + E ) 770,770.25
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Pasangan Batu Kosong ( Anstamping )


Satuan / Unit : M3
Analisa : AHSP PU A.3.2.1.9

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.7800 70,000.00 54,600.00
2 Tukang OH 0.3900 95,000.00 37,050.00
3 Kepala Tukang OH 0.0390 100,000.00 3,900.00
4 Mandor OH 0.0390 95,000.00 3,705.00
Jumlah Tenaga Kerja 99,255.00
B. BAHAN
1 Batu Gunung/ Batu Kali M3 1.2000 140,000.00 168,000.00
2 Pasir Urug M3 0.4320 89,900.00 38,836.80
Jumlah Bahan 206,836.80
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 306,091.80
E Overhead & Profit 15.0% X D 45,913.77
F Harga Satuan Pekerjaan ( D + E ) 352,005.57

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Membuat Beton Mutu F'c = 7,4 Mpa (K 100), Slump (12 ± 2) cm, W/c = 0,87
Satuan / Unit : M3
Analisa : AHSP PU A.4.1.1.1

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 1.6500 70,000.00 115,500.00
2 Tukang OH 0.2750 95,000.00 26,125.00
3 Kepala Tukang OH 0.0280 100,000.00 2,800.00
4 Mandor OH 0.0830 95,000.00 7,885.00
Jumlah Tenaga Kerja 152,310.00
B. BAHAN
1 Semen Portland Kg 247.00 1,320.00 326,040.00
2 Pasir Beton Kg 869.00 132.14 114,832.14
3 Kerikil Kg 999.00 137.04 136,900.00
4 Air Liter 215.00 100.00 21,500.00
Jumlah Bahan 599,272.14
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 751,582.14
E Overhead & Profit 15.0% X D 112,737.32
F Harga Satuan Pekerjaan ( D + E ) 864,319.46
Wc Faktor; Pasir; 1.400 Kg, dan Kerikil = 1.350 Kg
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Membuat Beton Mutu F'c = 9,8 Mpa (K 125), Slump (12 ± 2) cm, W/c = 0,78
Satuan / Unit : M3
Analisa : AHSP PU A.4.1.1.2

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 1.6500 70,000.00 115,500.00
2 Tukang OH 0.2750 95,000.00 26,125.00
3 Kepala Tukang OH 0.0280 100,000.00 2,800.00
4 Mandor OH 0.0830 95,000.00 7,885.00
Jumlah Tenaga Kerja 152,310.00
B. BAHAN
1 Semen Portland Kg 276.00 1,320.00 364,320.00
2 Pasir Beton Kg 828.00 132.14 109,414.29
3 Kerikil Kg 1,012.00 137.04 138,681.48
4 Air Liter 215.00 100.00 21,500.00
Jumlah Bahan 633,915.77
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 786,225.77
E Overhead & Profit 15.0% X D 117,933.87
F Harga Satuan Pekerjaan ( D + E ) 904,159.63
Wc Faktor; Pasir; 1.400 Kg, dan Kerikil = 1.350 Kg

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Beton Mutu F'c = 14,5 Mpa (K 175), Slump (12 ± 2) cm, W/c = 0,66
Satuan / Unit : M3
Analisa : AHSP PU A.4.1.1.5

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 1.6500 70,000.00 115,500.00
2 Tukang OH 0.2750 95,000.00 26,125.00
3 Kepala Tukang OH 0.0280 100,000.00 2,800.00
4 Mandor OH 0.0830 95,000.00 7,885.00
Jumlah Tenaga Kerja 152,310.00
B. BAHAN
1 Semen Portland Kg 326.00 1,320.00 430,320.00
2 Pasir Beton Kg 760.00 132.14 100,428.57
3 Kerikil Kg 1,029.00 137.04 141,011.11
4 Air Liter 215.00 100.00 21,500.00
Jumlah Bahan 693,259.68
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 845,569.68
E Overhead & Profit 15.0% X D 126,835.45
F Harga Satuan Pekerjaan ( D + E ) 972,405.13
Wc Faktor; Pasir; 1.400 Kg, dan Kerikil = 1.350 Kg
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Beton Mutu F'c = 16,9 Mpa (K 200), Slump (12 ± 2) cm, W/c = 0,61
Satuan / Unit : M3
Analisa : AHSP PU A.4.1.1.6

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 1.6500 70,000.00 115,500.00
2 Tukang OH 0.2750 95,000.00 26,125.00
3 Kepala Tukang OH 0.0280 100,000.00 2,800.00
4 Mandor OH 0.0830 95,000.00 7,885.00
Jumlah Tenaga Kerja 152,310.00
B. BAHAN
1 Semen Portland Kg 352.00 1,320.00 464,640.00
2 Pasir Beton Kg 731.00 132.14 96,596.43
3 Kerikil Kg 1,029.00 137.04 141,011.11
4 Air Liter 215.00 100.00 21,500.00
Jumlah Bahan 723,747.54
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 876,057.54
E Overhead & Profit 15.0% X D 131,408.63
F Harga Satuan Pekerjaan ( D + E ) 1,007,466.17
Wc Faktor; Pasir; 1.400 Kg, dan Kerikil = 1.350 Kg

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Beton Mutu F'c = 19,3 Mpa (K 225), Slump (12 ± 2) cm, W/c = 0,58
Satuan / Unit : M3
Analisa : AHSP PU A.4.1.1.7

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 1.6500 70,000.00 115,500.00
2 Tukang OH 0.2750 95,000.00 26,125.00
3 Kepala Tukang OH 0.0280 100,000.00 2,800.00
4 Mandor OH 0.0830 95,000.00 7,885.00
Jumlah Tenaga Kerja 152,310.00
B. BAHAN
1 Semen Portland Kg 371.00 1,320.00 489,720.00
2 Pasir Beton Kg 698.00 132.14 92,235.71
3 Kerikil Kg 1,047.00 137.04 143,477.78
4 Air Liter 215.00 100.00 21,500.00
Jumlah Bahan 746,933.49
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 899,243.49
E Overhead & Profit 15.0% X D 134,886.52
F Harga Satuan Pekerjaan ( D + E ) 1,034,130.02
Wc Faktor; Pasir; 1.400 Kg, dan Kerikil = 1.350 Kg
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Beton Mutu F'c = 21,7 Mpa (K 250), Slump (12 ± 2) cm, W/c = 0,56
Satuan / Unit : M3
Analisa : AHSP PU A.4.1.1.8

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 1.6500 70,000.00 115,500.00
2 Tukang OH 0.2750 95,000.00 26,125.00
3 Kepala Tukang OH 0.0280 100,000.00 2,800.00
4 Mandor OH 0.0830 95,000.00 7,885.00
Jumlah Tenaga Kerja 152,310.00
B. BAHAN
1 Semen Portland Kg 384.00 1,320.00 506,880.00
2 Pasir Beton Kg 692.00 132.14 91,442.86
3 Kerikil Kg 1,039.00 137.04 142,381.48
4 Air Liter 215.00 100.00 21,500.00
Jumlah Bahan 762,204.34
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 914,514.34
E Overhead & Profit 15.0% X D 137,177.15
F Harga Satuan Pekerjaan ( D + E ) 1,051,691.49
Wc Faktor; Pasir; 1.400 Kg, dan Kerikil = 1.350 Kg

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Beton Mutu F'c = 24,0 Mpa (K 275), Slump (12 ± 2) cm, W/c = 0,53
Satuan / Unit : M3
Analisa : AHSP PU A.4.1.1.8

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 1.6500 70,000.00 115,500.00
2 Tukang OH 0.2750 95,000.00 26,125.00
3 Kepala Tukang OH 0.0280 100,000.00 2,800.00
4 Mandor OH 0.0830 95,000.00 7,885.00
Jumlah Tenaga Kerja 152,310.00
B. BAHAN
1 Semen Portland Kg 406.00 1,320.00 535,920.00
2 Pasir Beton Kg 684.00 132.14 90,385.71
3 Kerikil Kg 1,026.00 137.04 140,600.00
4 Air Liter 215.00 100.00 21,500.00
Jumlah Bahan 788,405.71
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 940,715.71
E Overhead & Profit 15.0% X D 141,107.36
F Harga Satuan Pekerjaan ( D + E ) 1,081,823.07

Wc Faktor; Pasir; 1.400 Kg, dan Kerikil = 1.350 Kg


ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Beton Mutu F'c = 26,4 Mpa (K 300), Slump (12 ± 2) cm, W/c = 0,52
Satuan / Unit : M3
Analisa : AHSP PU A.4.1.1.8

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 1.6500 70,000.00 115,500.00
2 Tukang OH 0.2750 95,000.00 26,125.00
3 Kepala Tukang OH 0.0280 100,000.00 2,800.00
4 Mandor OH 0.0830 95,000.00 7,885.00
Jumlah Tenaga Kerja 152,310.00
B. BAHAN
1 Semen Portland Kg 413.00 1,320.00 545,160.00
2 Pasir Beton Kg 681.00 132.14 89,989.29
3 Kerikil Kg 1,021.00 137.04 139,914.81
4 Air Liter 215.00 100.00 21,500.00
Jumlah Bahan 796,564.10
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 948,874.10
E Overhead & Profit 15.0% X D 142,331.12
F Harga Satuan Pekerjaan ( D + E ) 1,091,205.22

Wc Faktor; Pasir; 1.400 Kg, dan Kerikil = 1.350 Kg

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Pembesian 1 Kg Dengan Besi Polos


Satuan / Unit : Kg
Analisa : AHSP PU A.4.1.1.17

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.0700 70,000.00 4,900.00
2 Tukang OH 0.0700 95,000.00 6,650.00
3 Kepala Tukang OH 0.0070 100,000.00 700.00
4 Mandor OH 0.0400 95,000.00 3,800.00
Jumlah Tenaga Kerja 16,050.00
B. BAHAN
1 Besi Beton Polos Kg 10.500 9,200.00 96,600.00
2 Kawat Beton Kg 0.150 18,700.00 2,805.00
Jumlah Bahan 99,405.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 115,455.00
E Per Kg Pembesian = D / 10 11,545.50
F Overhead & Profit 15.0% X E 1,731.83
G Harga Satuan Pekerjaan ( E + F ) 13,277.33
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Pembesian 1 Kg Dengan Besi Ulir


Satuan / Unit : Kg
Analisa : AHSP PU A.4.1.1.17.a

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.0700 70,000.00 4,900.00
2 Tukang OH 0.0700 95,000.00 6,650.00
3 Kepala Tukang OH 0.0070 100,000.00 700.00
4 Mandor OH 0.0400 95,000.00 3,800.00
Jumlah Tenaga Kerja 16,050.00
B. BAHAN
1 Besi Beton Ulir Kg 10.500 10,200.00 107,100.00
2 Kawat Beton Kg 0.150 18,700.00 2,805.00
Jumlah Bahan 109,905.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 125,955.00
E Per Kg Pembesian = D / 10 12,595.50
F Overhead & Profit 15.0% X E 1,889.33
G Harga Satuan Pekerjaan ( E + F ) 14,484.83

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Memasang 1 Kg Jaring Kawat Baja / Wire Mesh


Satuan / Unit : Kg
Analisa : AHSP PU A.4.1.1.19

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.0250 70,000.00 1,750.00
2 Tukang OH 0.0250 95,000.00 2,375.00
3 Kepala Tukang OH 0.0020 100,000.00 200.00
4 Mandor OH 0.0010 95,000.00 95.00
Jumlah Tenaga Kerja 4,420.00
B. BAHAN
1 Jaring Kawat Baja Di Las Kg 1.020 15,500.00 15,810.00
2 Kawat Beton Kg 0.050 18,700.00 935.00
Jumlah Bahan 16,745.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 21,165.00
E Overhead & Profit 15.0% X D 3,174.75
F Harga Satuan Pekerjaan ( D + E ) 24,339.75
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Memasang Bekisting Untuk Pondasi


Satuan / Unit : M2
Analisa : AHSP PU A.4.1.1.20

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.5200 70,000.00 36,400.00
2 Tukang OH 0.2600 95,000.00 24,700.00
3 Kepala Tukang OH 0.0260 100,000.00 2,600.00
4 Mandor OH 0.0260 95,000.00 2,470.00
Jumlah Tenaga Kerja 66,170.00
B. BAHAN
1 Kayu Kelas III M3 0.040 4,554,850.00 182,194.00
2 Paku 5 cm - 10 cm Kg 0.300 15,400.00 4,620.00
3 Minyak Bekisting Liter 0.100 6,861.00 686.10
Jumlah Bahan 187,500.10
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 253,670.10
E Bekisting Dipakai 3 x = D/2 84,556.70
F Overhead & Profit 15.0% X E 12,683.51
G Harga Satuan Pekerjaan ( E + F ) 97,240.21

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Memasang Bekisting Untuk Sloof


Satuan / Unit : M2
Analisa : AHSP PU A.4.1.1.21

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.5200 70,000.00 36,400.00
2 Tukang OH 0.2600 95,000.00 24,700.00
3 Kepala Tukang OH 0.0260 100,000.00 2,600.00
4 Mandor OH 0.0260 95,000.00 2,470.00
Jumlah Tenaga Kerja 66,170.00
B. BAHAN
1 Kayu Kelas III M3 0.045 4,554,850.00 204,968.25
2 Paku 5 cm - 10 cm Kg 0.300 15,400.00 4,620.00
3 Minyak Bekisting Liter 0.100 6,861.00 686.10
Jumlah Bahan 210,274.35
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 276,444.35
E Bekisting Dipakai 3 x = D/2 92,148.12
F Overhead & Profit 15.0% X E 13,822.22
G Harga Satuan Pekerjaan ( E + F ) 105,970.33
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Memasang Bekisting Untuk Kolom


Satuan / Unit : M2
Analisa : AHSP PU A.4.1.1.22

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.6600 70,000.00 46,200.00
2 Tukang OH 0.3300 95,000.00 31,350.00
3 Kepala Tukang OH 0.0330 100,000.00 3,300.00
4 Mandor OH 0.0330 95,000.00 3,135.00
Jumlah Tenaga Kerja 83,985.00
B. BAHAN
1 Kayu Kelas III M3 0.0400 4,554,850.00 182,194.00
2 Paku 5 cm - 10 cm Kg 0.4000 15,400.00 6,160.00
3 Minyak Bekisting Liter 0.2000 6,861.00 1,372.20
4 Balok Kayu Kelas II M3 0.0150 5,255,650.00 78,834.75
5 Plywood tebal 9 mm Lbr 0.3500 150,000.00 52,500.00
6 Kayu dolken dia. 8-10 cm, L = 4 M Batang 2.0000 28,000.00 56,000.00
Jumlah Bahan 377,060.95
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 461,045.95
E Bekisting Dipakai 3 x = D/2 153,681.98
F Overhead & Profit 15.0% X E 23,052.30
G Harga Satuan Pekerjaan ( E + F ) 176,734.28

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Memasang Bekisting Untuk Balok


Satuan / Unit : M2
Analisa : AHSP PU A.4.1.1.23

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.6600 70,000.00 46,200.00
2 Tukang OH 0.3300 95,000.00 31,350.00
3 Kepala Tukang OH 0.0330 100,000.00 3,300.00
4 Mandor OH 0.0330 95,000.00 3,135.00
Jumlah Tenaga Kerja 83,985.00
B. BAHAN
1 Kayu Kelas III M3 0.0400 4,554,850.00 182,194.00
2 Paku 5 cm - 10 cm Kg 0.4000 15,400.00 6,160.00
3 Minyak Bekisting Liter 0.2000 6,861.00 1,372.20
4 Balok Kayu Kelas II M3 0.0180 5,255,650.00 94,601.70
5 Plywood tebal 9 mm Lbr 0.3500 150,000.00 52,500.00
6 Kayu dolken dia. 8-10 cm, L = 4 M Batang 2.0000 28,000.00 56,000.00
Jumlah Bahan 392,827.90
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 476,812.90
E Bekisting Dipakai 3 x = D/2 158,937.63
F Overhead & Profit 15.0% X E 23,840.65
G Harga Satuan Pekerjaan ( E + F ) 182,778.28
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Memasang Bekisting Untuk Plat Lantai


Satuan / Unit : M2
Analisa : AHSP PU A.4.1.1.24

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.6600 70,000.00 46,200.00
2 Tukang OH 0.3300 95,000.00 31,350.00
3 Kepala Tukang OH 0.0330 100,000.00 3,300.00
4 Mandor OH 0.0330 95,000.00 3,135.00
Jumlah Tenaga Kerja 83,985.00
B. BAHAN
1 Kayu Kelas III M3 0.0400 4,554,850.00 182,194.00
2 Paku 5 cm - 10 cm Kg 0.4000 15,400.00 6,160.00
3 Minyak Bekisting Liter 0.2000 6,861.00 1,372.20
4 Balok Kayu Kelas II M3 0.0150 5,255,650.00 78,834.75
5 Plywood tebal 9 mm Lbr 0.3500 150,000.00 52,500.00
6 Kayu dolken dia. 8-10 cm, L = 4 M Batang 6.0000 28,000.00 168,000.00
Jumlah Bahan 489,060.95
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 573,045.95
E Bekisting Dipakai 3 x = D/2 191,015.32
F Overhead & Profit 15.0% X E 28,652.30
G Harga Satuan Pekerjaan ( E + F ) 219,667.61

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Memasang Bekisting Untuk Dinding


Satuan / Unit : M2
Analisa : AHSP PU A.4.1.1.25

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.6600 70,000.00 46,200.00
2 Tukang OH 0.3300 95,000.00 31,350.00
3 Kepala Tukang OH 0.0330 100,000.00 3,300.00
4 Mandor OH 0.0330 95,000.00 3,135.00
Jumlah Tenaga Kerja 83,985.00
B. BAHAN
1 Kayu Kelas III M3 0.030 4,554,850.00 136,645.50
2 Paku 5 cm - 10 cm Kg 0.400 15,400.00 6,160.00
3 Minyak Bekisting Liter 0.200 6,861.00 1,372.20
4 Balok Kayu Kelas II M3 0.020 5,255,650.00 105,113.00
5 Plywood tebal 9 mm Lbr 0.350 150,000.00 52,500.00
6 Kayu dolken dia. 8-10 cm, L = 4 M Batang 3.000 28,000.00 84,000.00
7 Penjaga jarak bekisting/ Spacer Bh 4.000 25,000.00 100,000.00
Jumlah Bahan 485,790.70
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 569,775.70
E Bekisting Dipakai 2 x = D/2 284,887.85
F Overhead & Profit 15.0% X E 42,733.18
G Harga Satuan Pekerjaan ( E + F ) 327,621.03
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Memasang Bekisting Untuk Tangga


Satuan / Unit : M2
Analisa : AHSP PU A.4.1.1.26

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.6600 70,000.00 46,200.00
2 Tukang OH 0.3300 95,000.00 31,350.00
3 Kepala Tukang OH 0.0330 100,000.00 3,300.00
4 Mandor OH 0.0330 95,000.00 3,135.00
Jumlah Tenaga Kerja 83,985.00
B. BAHAN
1 Kayu Kelas III M3 0.030 4,554,850.00 136,645.50
2 Paku 5 cm - 10 cm Kg 0.400 15,400.00 6,160.00
3 Minyak Bekisting Liter 0.150 6,861.00 1,029.15
4 Balok Kayu Kelas II M3 0.015 5,255,650.00 78,834.75
5 Plywood tebal 9 mm Lbr 0.350 150,000.00 52,500.00
6 Kayu dolken dia. 8-10 cm, L = 4 M Batang 2.000 28,000.00 56,000.00
Jumlah Bahan 331,169.40
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 415,154.40
E Bekisting Dipakai 2 x = D/2 207,577.20
F Overhead & Profit 15.0% X E 31,136.58
G Harga Satuan Pekerjaan ( E + F ) 238,713.78

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Pemasangan Baja Profil


Satuan / Unit : Kg
Analisa : AHSP PU A.4.2.1.1

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.0600 70,000.00 4,200.00
2 Tukang OH 0.0600 95,000.00 5,700.00
3 Kepala Tukang OH 0.0060 100,000.00 600.00
4 Mandor OH 0.0030 95,000.00 285.00
Jumlah Tenaga Kerja 10,785.00
B. BAHAN
1 Besi Baja Profil Kg 1.150 16,000.00 18,400.00
Jumlah Bahan 18,400.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 29,185.00
E Overhead & Profit 15.0% X E 4,377.75
F Harga Satuan Pekerjaan ( E + F ) 33,562.75
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Pemasangan Rangka Kuda-Kuda Baja IWF


Satuan / Unit : Kg
Analisa : AHSP PU A.4.2.1.2

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.0600 70,000.00 4,200.00
2 Tukang OH 0.0600 95,000.00 5,700.00
3 Kepala Tukang OH 0.0060 100,000.00 600.00
4 Mandor OH 0.0030 95,000.00 285.00
Jumlah Tenaga Kerja 10,785.00
B. BAHAN
1 Besi Baja IWF Kg 1.150 16,000.00 18,400.00
Jumlah Bahan 18,400.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 29,185.00
E Overhead & Profit 15.0% X E 4,377.75
F Harga Satuan Pekerjaan ( E + F ) 33,562.75

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Pemasangan Kusen Pintu Alluminum


Satuan / Unit : M
Analisa : AHSP PU A.4.2.1.11

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.0430 70,000.00 3,010.00
2 Tukang OH 0.0430 95,000.00 4,085.00
3 Kepala Tukang OH 0.0043 100,000.00 430.00
4 Mandor OH 0.0021 95,000.00 199.50
Jumlah Tenaga Kerja 7,724.50
B. BAHAN
1 Profil Alluminium M 1.100 15,000.00 16,500.00
2 Sekrup fixer Buah 2.000 500.00 1,000.00
3 Sealant Tube 0.060 15,500.00 930.00
Jumlah Bahan 18,430.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 26,154.50
E Overhead & Profit 15.0% X E 3,923.18
F Harga Satuan Pekerjaan ( E + F ) 30,077.68
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Pasangan Dinding Bata Tebal 1 Bata Camp. 1Pc : 2 PP.
Satuan / Unit : M2
Analisa : AHSP PU A.4.4.1.1

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.6000 70,000.00 42,000.00
2 Tukang OH 0.2000 95,000.00 19,000.00
3 Kepala Tukang OH 0.0200 100,000.00 2,000.00
4 Mandor OH 0.0300 95,000.00 2,850.00
Jumlah Tenaga Kerja 65,850.00
B. BAHAN
1 Batu Bata Bh 140.000 500.00 70,000.00
2 Semen Portland Kg 43.500 1,650.00 71,775.00
3 Pasir Pasang M3 0.080 185,000.00 14,800.00
Jumlah Bahan 156,575.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 222,425.00
E Overhead & Profit 15.0% X E 33,363.75
F Harga Satuan Pekerjaan ( E + F ) 255,788.75

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Pasangan Dinding Bata Tebal 1 Bata Camp. 1Pc : 3 PP


Satuan / Unit : M2
Analisa : AHSP PU A.4.4.1.2

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.6000 70,000.00 42,000.00
2 Tukang OH 0.2000 95,000.00 19,000.00
3 Kepala Tukang OH 0.0200 100,000.00 2,000.00
4 Mandor OH 0.0300 95,000.00 2,850.00
Jumlah Tenaga Kerja 65,850.00
B. BAHAN
1 Batu Bata Bh 140.000 500.00 70,000.00
2 Semen Portland Kg 32.950 1,650.00 54,367.50
3 Pasir Pasang M3 0.091 185,000.00 16,835.00
Jumlah Bahan 141,202.50
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 207,052.50
E Overhead & Profit 15.0% X E 31,057.88
F Harga Satuan Pekerjaan ( E + F ) 238,110.38
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Pasangan Dinding Bata Tebal 1 Bata Camp. 1Pc : 4 PP


Satuan / Unit : M2
Analisa : AHSP PU A.4.4.1.3

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.6000 70,000.00 42,000.00
2 Tukang OH 0.2000 95,000.00 19,000.00
3 Kepala Tukang OH 0.0200 100,000.00 2,000.00
4 Mandor OH 0.0300 95,000.00 2,850.00
Jumlah Tenaga Kerja 65,850.00
B. BAHAN
1 Batu Bata Bh 140.000 500.00 70,000.00
2 Semen Portland Kg 26.550 1,650.00 43,807.50
3 Pasir Pasang M3 0.093 185,000.00 17,205.00
Jumlah Bahan 131,012.50
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 196,862.50
E Overhead & Profit 15.0% X E 29,529.38
F Harga Satuan Pekerjaan ( E + F ) 226,391.88

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Pasangan Dinding Bata Tebal 1 Bata Camp. 1Pc : 5 PP


Satuan / Unit : M2
Analisa : AHSP PU A.4.4.1.4

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.6000 70,000.00 42,000.00
2 Tukang OH 0.2000 95,000.00 19,000.00
3 Kepala Tukang OH 0.0200 100,000.00 2,000.00
4 Mandor OH 0.0300 95,000.00 2,850.00
Jumlah Tenaga Kerja 65,850.00
B. BAHAN
1 Batu Bata Bh 140.000 500.00 70,000.00
2 Semen Portland Kg 22.200 1,650.00 36,630.00
3 Pasir Pasang M3 0.102 185,000.00 18,870.00
Jumlah Bahan 125,500.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 191,350.00
E Overhead & Profit 15.0% X E 28,702.50
F Harga Satuan Pekerjaan ( E + F ) 220,052.50
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Pasangan Dinding Bata Tebal 1/2 Bata Camp. 1Pc : 2 PP
Satuan / Unit : M2
Analisa : AHSP PU A.4.4.1.7

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.3000 70,000.00 21,000.00
2 Tukang OH 0.1000 95,000.00 9,500.00
3 Kepala Tukang OH 0.0100 100,000.00 1,000.00
4 Mandor OH 0.0150 95,000.00 1,425.00
Jumlah Tenaga Kerja 32,925.00
B. BAHAN
1 Batu Bata Bh 80.000 500.00 40,000.00
2 Semen Portland Kg 18.950 1,650.00 31,267.50
3 Pasir Pasang M3 0.038 185,000.00 7,030.00
Jumlah Bahan 78,297.50
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 111,222.50
E Overhead & Profit 15.0% X E 16,683.38
F Harga Satuan Pekerjaan ( E + F ) 127,905.88

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Pasangan Dinding Bata Tebal 1/2 Bata Camp. 1Pc : 3 PP
Satuan / Unit : M2
Analisa : AHSP PU A.4.4.1.8

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.3000 70,000.00 21,000.00
2 Tukang OH 0.1000 95,000.00 9,500.00
3 Kepala Tukang OH 0.0100 100,000.00 1,000.00
4 Mandor OH 0.0150 95,000.00 1,425.00
Jumlah Tenaga Kerja 32,925.00
B. BAHAN
1 Batu Bata Bh 70.000 500.00 35,000.00
2 Semen Portland Kg 14.370 1,650.00 23,710.50
3 Pasir Pasang M3 0.040 185,000.00 7,400.00
Jumlah Bahan 66,110.50
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 99,035.50
E Overhead & Profit 15.0% X E 14,855.33
F Harga Satuan Pekerjaan ( E + F ) 113,890.83
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Pasangan Dinding Bata Tebal 1/2 Bata Camp. 1Pc : 4 PP
Satuan / Unit : M2
Analisa : AHSP PU A.4.4.1.9

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.3000 70,000.00 21,000.00
2 Tukang OH 0.1000 95,000.00 9,500.00
3 Kepala Tukang OH 0.0100 100,000.00 1,000.00
4 Mandor OH 0.0150 95,000.00 1,425.00
Jumlah Tenaga Kerja 32,925.00
B. BAHAN
1 Batu Bata Bh 80.000 500.00 40,000.00
2 Semen Portland Kg 11.500 1,650.00 18,975.00
3 Pasir Pasang M3 0.043 185,000.00 7,955.00
Jumlah Bahan 66,930.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 99,855.00
E Overhead & Profit 15.0% X E 14,978.25
F Harga Satuan Pekerjaan ( E + F ) 114,833.25

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Pasangan Dinding Bata Tebal 1/2 Bata Camp. 1Pc : 5 PP
Satuan / Unit : M2
Analisa : AHSP PU A.4.4.1.10

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.3000 70,000.00 21,000.00
2 Tukang OH 0.1000 95,000.00 9,500.00
3 Kepala Tukang OH 0.0100 100,000.00 1,000.00
4 Mandor OH 0.0150 95,000.00 1,425.00
Jumlah Tenaga Kerja 32,925.00
B. BAHAN
1 Batu Bata Bh 70.000 500.00 35,000.00
2 Semen Portland Kg 9.680 1,650.00 15,972.00
3 Pasir Pasang M3 0.045 185,000.00 8,325.00
Jumlah Bahan 59,297.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 92,222.00
E Overhead & Profit 15.0% X E 13,833.30
F Harga Satuan Pekerjaan ( E + F ) 106,055.30
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Pasangan Dinding Kerawang (Roster) Camp. 1 PC : 3 PP


Satuan / Unit : M2
Analisa : AHSP PU A.4.4.1.22

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.3000 70,000.00 21,000.00
2 Tukang OH 0.1000 95,000.00 9,500.00
3 Kepala Tukang OH 0.0100 100,000.00 1,000.00
4 Mandor OH 0.0150 95,000.00 1,425.00
Jumlah Tenaga Kerja 32,925.00
B. BAHAN
1 Kerawang/ Roster Bh 30.000 3,500.00 105,000.00
2 Semen Portland Kg 11.000 1,650.00 18,150.00
3 Pasir Pasang M3 0.035 185,000.00 6,475.00
Jumlah Bahan 129,625.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 162,550.00
E Overhead & Profit 15.0% X E 24,382.50
F Harga Satuan Pekerjaan ( E + F ) 186,932.50

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Pasangan Dinding Kerawang (Roster) Camp. 1 PC : 4 PP


Satuan / Unit : M2
Analisa : AHSP PU A.4.4.1.23

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.3000 70,000.00 21,000.00
2 Tukang OH 0.1000 95,000.00 9,500.00
3 Kepala Tukang OH 0.0100 100,000.00 1,000.00
4 Mandor OH 0.0150 95,000.00 1,425.00
Jumlah Tenaga Kerja 32,925.00
B. BAHAN
1 Kerawang/ Roster Bh 30.000 3,500.00 105,000.00
2 Semen Portland Kg 11.000 1,650.00 18,150.00
3 Pasir Pasang M3 0.035 185,000.00 6,475.00
Jumlah Bahan 129,625.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 162,550.00
E Overhead & Profit 15.0% X E 24,382.50
F Harga Satuan Pekerjaan ( E + F ) 186,932.50
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Plesteran 1 PC : 1 PP Tebal 15 mm


Satuan / Unit : M2
Analisa : AHSP PU A.4.4.2.1

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.3000 70,000.00 21,000.00
2 Tukang OH 0.1500 95,000.00 14,250.00
3 Kepala Tukang OH 0.0150 100,000.00 1,500.00
4 Mandor OH 0.0150 95,000.00 1,425.00
Jumlah Tenaga Kerja 38,175.00
B. BAHAN
1 Semen Portland Kg 15.504 1,650.00 25,581.60
2 Pasir Pasang M3 0.016 185,000.00 2,960.00
Jumlah Bahan 28,541.60
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 66,716.60
E Overhead & Profit 15.0% X E 10,007.49
F Harga Satuan Pekerjaan ( E + F ) 76,724.09

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Plesteran 1 PC : 2 PP Tebal 15 mm


Satuan / Unit : M2
Analisa : AHSP PU A.4.4.2.2

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.3000 70,000.00 21,000.00
2 Tukang OH 0.1500 95,000.00 14,250.00
3 Kepala Tukang OH 0.0150 100,000.00 1,500.00
4 Mandor OH 0.0150 95,000.00 1,425.00
Jumlah Tenaga Kerja 38,175.00
B. BAHAN
1 Semen Portland Kg 10.224 1,650.00 16,869.60
2 Pasir Pasang M3 0.020 185,000.00 3,700.00
Jumlah Bahan 20,569.60
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 58,744.60
E Overhead & Profit 15.0% X E 8,811.69
F Harga Satuan Pekerjaan ( E + F ) 67,556.29
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Plesteran 1 PC : 3 PP Tebal 15 mm


Satuan / Unit : M2
Analisa : AHSP PU A.4.4.2.3

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.3000 70,000.00 21,000.00
2 Tukang OH 0.1500 95,000.00 14,250.00
3 Kepala Tukang OH 0.0150 100,000.00 1,500.00
4 Mandor OH 0.0150 95,000.00 1,425.00
Jumlah Tenaga Kerja 38,175.00
B. BAHAN
1 Semen Portland Kg 7.776 1,650.00 12,830.40
2 Pasir Pasang M3 0.023 185,000.00 4,255.00
Jumlah Bahan 17,085.40
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 55,260.40
E Overhead & Profit 15.0% X E 8,289.06
F Harga Satuan Pekerjaan ( E + F ) 63,549.46

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Plesteran 1 PC : 4 PP Tebal 15 mm


Satuan / Unit : M2
Analisa : AHSP PU A.4.4.2.4

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.3000 70,000.00 21,000.00
2 Tukang OH 0.1500 95,000.00 14,250.00
3 Kepala Tukang OH 0.0150 100,000.00 1,500.00
4 Mandor OH 0.0150 95,000.00 1,425.00
Jumlah Tenaga Kerja 38,175.00
B. BAHAN
1 Semen Portland Kg 6.240 1,650.00 10,296.00
2 Pasir Pasang M3 0.024 185,000.00 4,440.00
Jumlah Bahan 14,736.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 52,911.00
E Overhead & Profit 15.0% X E 7,936.65
F Harga Satuan Pekerjaan ( E + F ) 60,847.65
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Plesteran 1 PC : 5 PP Tebal 15 mm


Satuan / Unit : M2
Analisa : AHSP PU A.4.4.2.5

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.3000 70,000.00 21,000.00
2 Tukang OH 0.1500 95,000.00 14,250.00
3 Kepala Tukang OH 0.0150 100,000.00 1,500.00
4 Mandor OH 0.0150 95,000.00 1,425.00
Jumlah Tenaga Kerja 38,175.00
B. BAHAN
1 Semen Portland Kg 5.184 1,650.00 8,553.60
2 Pasir Pasang M3 0.026 185,000.00 4,810.00
Jumlah Bahan 13,363.60
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 51,538.60
E Overhead & Profit 15.0% X E 7,730.79
F Harga Satuan Pekerjaan ( E + F ) 59,269.39

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Acian


Satuan / Unit : M2
Analisa : AHSP PU A.4.4.2.27

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.2000 70,000.00 14,000.00
2 Tukang OH 0.1000 95,000.00 9,500.00
3 Kepala Tukang OH 0.0100 100,000.00 1,000.00
4 Mandor OH 0.0100 95,000.00 950.00
Jumlah Tenaga Kerja 25,450.00
B. BAHAN
1 Semen Portland Kg 3.250 1,650.00 5,362.50
Jumlah Bahan 5,362.50
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 30,812.50
E Overhead & Profit 15.0% X E 4,621.88
F Harga Satuan Pekerjaan ( E + F ) 35,434.38
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Pasangan 1 m2 lantai Keramik Uk. 60 x 60 cm


Satuan / Unit : M2
Analisa : AHSP PU A.4.4.3.16

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.2500 70,000.00 17,500.00
2 Tukang OH 0.1250 95,000.00 11,875.00
3 Kepala Tukang OH 0.0130 100,000.00 1,300.00
4 Mandor OH 0.0130 95,000.00 1,235.00
Jumlah Tenaga Kerja 31,910.00
B. BAHAN
1 Keramik Lantai 60 x 60 cm Bh 3.100 67,741.94 210,000.00
2 Semen Portland Kg 9.600 1,650.00 15,840.00
3 Semen Warna Kg 1.500 3,000.00 4,500.00
4 Pasir Pasang M3 0.045 185,000.00 8,325.00
Jumlah Bahan 238,665.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 270,575.00
E Overhead & Profit 15.0% X E 40,586.25
F Harga Satuan Pekerjaan ( E + F ) 311,161.25

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Pasangan 1 m2 lantai Granite Uk. 60 x 60 cm


Satuan / Unit : M2
Analisa : AHSP PU A.4.4.3.16.a

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.2500 33,000.00 8,250.00
2 Tukang OH 0.1250 85,000.00 10,625.00
3 Kepala Tukang OH 0.0130 17,500.00 227.50
4 Mandor OH 0.0130 16,000.00 208.00
Jumlah Tenaga Kerja 19,310.50
B. BAHAN
1 Granite 60 x 60 cm Bh 3.100 109,677.42 340,000.00
2 Semen Portland Kg 9.600 1,650.00 15,840.00
3 Semen Warna Kg 1.500 3,700.00 5,550.00
4 Pasir Pasang M3 0.045 185,000.00 8,325.00
Jumlah Bahan 369,715.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 389,025.50
E Overhead & Profit 15.0% X E 58,353.83
F Harga Satuan Pekerjaan ( E + F ) 447,379.33
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Pasangan 1 m2 lantai Keramik Uk. 40 x 40 cm


Satuan / Unit : M2
Analisa : AHSP PU A.4.4.3.9

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.2500 70,000.00 17,500.00
2 Tukang OH 0.1250 95,000.00 11,875.00
3 Kepala Tukang OH 0.0130 100,000.00 1,300.00
4 Mandor OH 0.0130 95,000.00 1,235.00
Jumlah Tenaga Kerja 31,910.00
B. BAHAN
1 Keramik Lantai 40 x 40 cm Bh 6.630 7,541.48 50,000.00
2 Semen Portland Kg 9.800 1,650.00 16,170.00
3 Semen Warna Kg 1.300 3,700.00 4,810.00
4 Pasir Pasang M3 0.045 185,000.00 8,325.00
Jumlah Bahan 79,305.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 111,215.00
E Overhead & Profit 15.0% X E 16,682.25
F Harga Satuan Pekerjaan ( E + F ) 127,897.25
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Pasangan Keramik Lantai Uk. 30 x 30 cm


Satuan / Unit : M2
Analisa : AHSP PU A.4.4.3.35

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.7000 70,000.00 49,000.00
2 Tukang OH 0.3500 95,000.00 33,250.00
3 Kepala Tukang OH 0.0350 100,000.00 3,500.00
4 Mandor OH 0.0350 95,000.00 3,325.00
Jumlah Tenaga Kerja 89,075.00
B. BAHAN
1 Keramik Lantai 30 x 30 cm Bh 11.870 5,160.07 61,250.00
2 Semen Portland Kg 10.000 1,650.00 16,500.00
3 Semen Warna Kg 1.500 3,700.00 5,550.00
4 Pasir Pasang M3 0.045 185,000.00 8,325.00
Jumlah Bahan 91,625.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 180,700.00
E Overhead & Profit 15.0% X E 27,105.00
F Harga Satuan Pekerjaan ( E + F ) 207,805.00

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Pasangan Keramik Lantai Uk. 20 x 20 cm


Satuan / Unit : M2
Analisa : AHSP PU A.4.4.3.36

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.2700 70,000.00 18,900.00
2 Tukang OH 0.1350 95,000.00 12,825.00
3 Kepala Tukang OH 0.0140 100,000.00 1,400.00
4 Mandor OH 0.0140 95,000.00 1,330.00
Jumlah Tenaga Kerja 34,455.00
B. BAHAN
1 Keramik Lantai 20 x 20 cm Bh 26.500 3,981.25 105,503.13
2 Semen Portland Kg 10.400 1,650.00 17,160.00
3 Semen Warna Kg 1.620 3,700.00 5,994.00
4 Pasir Pasang M3 0.045 185,000.00 8,325.00
Jumlah Bahan 136,982.13
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 171,437.13
E Overhead & Profit 15.0% X E 25,715.57
F Harga Satuan Pekerjaan ( E + F ) 197,152.69
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Pasangan Plint Keramik Uk. 10 x 10 cm


Satuan / Unit : M2
Analisa : AHSP PU A.4.4.3.40

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.0900 70,000.00 6,300.00
2 Tukang OH 0.0900 95,000.00 8,550.00
3 Kepala Tukang OH 0.0350 100,000.00 3,500.00
4 Mandor OH 0.0050 95,000.00 475.00
Jumlah Tenaga Kerja 18,825.00
B. BAHAN
1 Plint Keramik 10 x 10 cm Bh 10.600 1,400.00 14,840.00
2 Semen Portland Kg 1.140 1,650.00 1,881.00
3 Semen Warna Kg 0.050 3,700.00 185.00
4 Pasir Pasang M3 0.003 185,000.00 555.00
Jumlah Bahan 17,461.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 36,286.00
E Overhead & Profit 15.0% X E 5,442.90
F Harga Satuan Pekerjaan ( E + F ) 41,728.90

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Pasangan Dinding Keramik Uk. 20 x 25 cm


Satuan / Unit : M2
Analisa : AHSP PU A.4.4.3.54

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.9000 70,000.00 63,000.00
2 Tukang OH 0.4500 95,000.00 42,750.00
3 Kepala Tukang OH 0.0450 100,000.00 4,500.00
4 Mandor OH 0.0450 95,000.00 4,275.00
Jumlah Tenaga Kerja 114,525.00
B. BAHAN
1 Keramik Dinding 20 x 25 cm Bh 20.000 3,981.25 79,625.00
2 Semen Portland Kg 9.300 1,650.00 15,345.00
3 Semen Warna Kg 1.940 3,700.00 7,178.00
4 Pasir Pasang M3 0.018 185,000.00 3,330.00
Jumlah Bahan 105,478.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 220,003.00
E Overhead & Profit 15.0% X E 33,000.45
F Harga Satuan Pekerjaan ( E + F ) 253,003.45
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Memasang Langit-Langit Tripleks Ukuran (120 x 240) cm, tebal 4 mm
Satuan / Unit : M2
Analisa : AHSP PU A.4.5.1.5

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.1000 70,000.00 7,000.00
2 Tukang OH 0.1000 95,000.00 9,500.00
3 Kepala Tukang OH 0.0100 100,000.00 1,000.00
4 Mandor OH 0.0050 95,000.00 475.00
Jumlah Tenaga Kerja 17,975.00
B. BAHAN
1 Tripleks Tebal 4 mm Lbr 0.3750 87,000.00 32,625.00
2 Paku Triplek Kg 0.0300 15,400.00 462.00
Jumlah Bahan 33,087.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 51,062.00
E Overhead & Profit 15.0% X D 7,659.30
F Harga Satuan Pekerjaan ( D + E ) 58,721.30

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Memasang Langit-Langit Gypsum Board Tebal 9 mm


Satuan / Unit : M2
Analisa : AHSP PU A.4.5.1.7

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.1000 70,000.00 7,000.00
2 Tukang OH 0.0500 95,000.00 4,750.00
3 Kepala Tukang OH 0.0050 100,000.00 500.00
4 Mandor OH 0.0050 95,000.00 475.00
Jumlah Tenaga Kerja 12,725.00
B. BAHAN
1 Gypsum Board Lbr 0.3640 105,000.00 38,220.00
2 Paku Skrup Kg 0.1100 24,200.00 2,662.00
Jumlah Bahan 40,882.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 53,607.00
E Overhead & Profit 15.0% X D 8,041.05
F Harga Satuan Pekerjaan ( D + E ) 61,648.05
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Memasang List Profil Kayu


Satuan / Unit : M2
Analisa : AHSP PU A.4.5.1.9

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.0500 70,000.00 3,500.00
2 Tukang OH 0.0500 95,000.00 4,750.00
3 Kepala Tukang OH 0.0050 100,000.00 500.00
4 Mandor OH 0.0030 95,000.00 285.00
Jumlah Tenaga Kerja 9,035.00
B. BAHAN
1 List Profil M 1.0500 8,500.00 8,925.00
2 Paku Kayu Kg 0.0100 15,400.00 154.00
Jumlah Bahan 9,079.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 18,114.00
E Overhead & Profit 15.0% X D 2,717.10
F Harga Satuan Pekerjaan ( D + E ) 20,831.10

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Memasang Atap Seng Genteng


Satuan / Unit : M2
Analisa : AHSP PU A.4.5.2.32

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.2000 70,000.00 14,000.00
2 Tukang OH 0.1000 95,000.00 9,500.00
3 Kepala Tukang OH 0.0100 100,000.00 1,000.00
4 Mandor OH 0.0010 95,000.00 95.00
Jumlah Tenaga Kerja 24,595.00
B. BAHAN
1 Atap Seng Genteng Lbr 1.1500 95,000.00 109,250.00
2 Paku Seng Kg 0.2000 20,000.00 4,000.00
Jumlah Bahan 113,250.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 137,845.00
E Overhead & Profit 15.0% X D 20,676.75
F Harga Satuan Pekerjaan ( D + E ) 158,521.75
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Memasang Rabung Atap


Satuan / Unit : M2
Analisa : AHSP PU A.4.5.2.39.a

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.1500 70,000.00 10,500.00
2 Tukang OH 0.0700 95,000.00 6,650.00
3 Kepala Tukang OH 0.0070 100,000.00 700.00
4 Mandor OH 0.0200 95,000.00 1,900.00
Jumlah Tenaga Kerja 19,750.00
B. BAHAN
1 Rabung Seng Spandek M 0.3000 85,000.00 25,500.00
2 Paku seng Kg 0.2160 20,000.00 4,320.00
Jumlah Bahan 29,820.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 49,570.00
E Overhead & Profit 15.0% X D 7,435.50
F Harga Satuan Pekerjaan ( D + E ) 57,005.50

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Membuat dan Memasang Kusen pintu dan Kusen Jendela, Kayu Kelas I
Satuan / Unit : M3
Analisa : AHSP PU A.4.6.1.1

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 7.0000 70,000.00 490,000.00
2 Tukang OH 21.0000 95,000.00 1,995,000.00
3 Kepala Tukang OH 2.1000 100,000.00 210,000.00
4 Mandor OH 0.3500 95,000.00 33,250.00
Jumlah Tenaga Kerja 2,728,250.00
B. BAHAN
1 Balok Kayu Kelas I M3 1.1000 6,482,550.00 7,130,805.00
2 Paku Kayu Kg 1.2500 15,400.00 19,250.00
3 Lem Kayu Kg 1.0000 15,000.00 15,000.00
Jumlah Bahan 7,165,055.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 9,893,305.00
E Overhead & Profit 15.0% X D 1,483,995.75
F Harga Satuan Pekerjaan ( D + E ) 11,377,300.75
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Membuat dan Memasang Daun Pintu Panel Kayu Kelas II
Satuan / Unit : M2
Analisa : AHSP PU A.4.6.1.5

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 1.0000 70,000.00 70,000.00
2 Tukang OH 3.0000 95,000.00 285,000.00
3 Kepala Tukang OH 0.3000 100,000.00 30,000.00
4 Mandor OH 0.0500 95,000.00 4,750.00
Jumlah Tenaga Kerja 389,750.00
B. BAHAN
1 Papan Kayu Kelas II M3 0.0400 5,255,650.00 210,226.00
2 Lem Kayu Kg 0.5000 15,000.00 7,500.00
Jumlah Bahan 217,726.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 607,476.00
E Overhead & Profit 15.0% X D 91,121.40
F Harga Satuan Pekerjaan ( D + E ) 698,597.40

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Membuat dan Memasang Daun Jendela Kayu Kelas II


Satuan / Unit : M2
Analisa : AHSP PU A.4.6.1.6

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.8000 70,000.00 56,000.00
2 Tukang OH 2.4000 95,000.00 228,000.00
3 Kepala Tukang OH 0.2400 100,000.00 24,000.00
4 Mandor OH 0.0400 95,000.00 3,800.00
Jumlah Tenaga Kerja 311,800.00
B. BAHAN
1 Papan Kayu Kelas II M3 0.0240 5,255,650.00 126,135.60
2 Lem Kayu Kg 0.3000 15,000.00 4,500.00
Jumlah Bahan 130,635.60
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 442,435.60
E Overhead & Profit 15.0% X D 66,365.34
F Harga Satuan Pekerjaan ( D + E ) 508,800.94
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Memasang Jalusi Kusen, Kayu Kelas I


Satuan / Unit : M2
Analisa : AHSP PU A.4.6.1.10

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.6700 70,000.00 46,900.00
2 Tukang OH 2.0000 95,000.00 190,000.00
3 Kepala Tukang OH 0.2000 100,000.00 20,000.00
4 Mandor OH 0.3350 95,000.00 31,825.00
Jumlah Tenaga Kerja 288,725.00
B. BAHAN
1 Papan Kayu Kelas I M3 0.0600 6,482,550.00 388,953.00
2 Paku Kayu Kg 0.1500 15,400.00 2,310.00
Jumlah Bahan 391,263.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 679,988.00
E Overhead & Profit 15.0% X D 101,998.20
F Harga Satuan Pekerjaan ( D + E ) 781,986.20

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Memasang Konstruksi Kuda-Kuda, Kayu Kelas I


Satuan / Unit : M3
Analisa : AHSP PU A.4.6.1.14

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 6.7000 70,000.00 469,000.00
2 Tukang OH 20.1000 95,000.00 1,909,500.00
3 Kepala Tukang OH 2.0100 100,000.00 201,000.00
4 Mandor OH 0.3350 95,000.00 31,825.00
Jumlah Tenaga Kerja 2,611,325.00
B. BAHAN
1 Balok Kayu Kelas I M3 1.200 6,482,550.00 7,779,060.00
2 Besi Strip Tebal 5 mm Kg 15.000 16,000.00 240,000.00
3 Paku Kayu Kg 5.600 15,400.00 86,240.00
Jumlah Bahan 8,105,300.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 10,716,625.00
E Overhead & Profit 15.0% X D 1,607,493.75
F Harga Satuan Pekerjaan ( D + E ) 12,324,118.75
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Memasang Konstruksi Gordeng, Kayu Kelas II


Satuan / Unit : M3
Analisa : AHSP PU A.4.6.1.15

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 2.4000 70,000.00 168,000.00
2 Tukang OH 7.2000 95,000.00 684,000.00
3 Kepala Tukang OH 0.7200 100,000.00 72,000.00
4 Mandor OH 0.1200 95,000.00 11,400.00
Jumlah Tenaga Kerja 935,400.00
B. BAHAN
1 Balok Kayu Kelas II M3 1.1000 5,255,650.00 5,781,215.00
2 Besi Strip Tebal 5 mm Kg 15.0000 16,000.00 240,000.00
3 Paku Kayu Kg 3.0000 15,400.00 46,200.00
Jumlah Bahan 6,067,415.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 7,002,815.00
E Overhead & Profit 15.0% X D 1,050,422.25
F Harga Satuan Pekerjaan ( D + E ) 8,053,237.25

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Memasang Rangka Langit-Langit Kayu Kelas III


Satuan / Unit : M2
Analisa : AHSP PU A.4.6.1.20

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.2000 70,000.00 14,000.00
2 Tukang OH 0.3000 95,000.00 28,500.00
3 Kepala Tukang OH 0.0300 100,000.00 3,000.00
4 Mandor OH 0.0100 95,000.00 950.00
Jumlah Tenaga Kerja 46,450.00
B. BAHAN
1 Kayu Kaso 5 x 7 cm M3 0.0163 4,554,850.00 74,244.06
2 Paku Kayu Kg 0.2500 15,400.00 3,850.00
Jumlah Bahan 78,094.06
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 124,544.06
E Overhead & Profit 15.0% X D 18,681.61
F Harga Satuan Pekerjaan ( D + E ) 143,225.66
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Memasang Listplank Uk. 2.5 x 30 Cm Kayu Kelas I atau Klas II
Satuan / Unit : M'
Analisa : AHSP PU A.4.6.1.21

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.1000 70,000.00 7,000.00
2 Tukang OH 0.2000 95,000.00 19,000.00
3 Kepala Tukang OH 0.0200 100,000.00 2,000.00
4 Mandor OH 0.0050 95,000.00 475.00
Jumlah Tenaga Kerja 28,475.00
B. BAHAN
1 Kayu Kelas II M3 0.0108 4,554,850.00 49,192.38
2 Paku Kg 0.1000 15,400.00 1,540.00
Jumlah Bahan 50,732.38
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 79,207.38
E Overhead & Profit 15.0% X D 11,881.11
F Harga Satuan Pekerjaan ( D + E ) 91,088.49

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Memasang Kunci Silinder


Satuan / Unit : Buah
Analisa : AHSP PU A.4.6.2.4

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.0050 70,000.00 350.00
2 Tukang OH 0.5000 95,000.00 47,500.00
3 Kepala Tukang OH 0.0500 100,000.00 5,000.00
4 Mandor OH 0.0030 95,000.00 285.00
Jumlah Tenaga Kerja 53,135.00
B. BAHAN
1 Kunci Pintu Silinder Bh 1.0000 185,000.00 185,000.00
Jumlah Bahan 185,000.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 238,135.00
E Overhead & Profit 15.0% X D 35,720.25
F Harga Satuan Pekerjaan ( D + E ) 273,855.25
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Memasang Engsel Pintu


Satuan / Unit : Buah
Analisa : AHSP PU A.4.6.2.5

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.0150 70,000.00 1,050.00
2 Tukang OH 0.1500 95,000.00 14,250.00
3 Kepala Tukang OH 0.0150 100,000.00 1,500.00
4 Mandor OH 0.0008 95,000.00 76.00
Jumlah Tenaga Kerja 16,876.00
B. BAHAN
1 Engsel Pintu Bh 1.0000 17,500.00 17,500.00
Jumlah Bahan 17,500.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 34,376.00
E Overhead & Profit 15.0% X D 5,156.40
F Harga Satuan Pekerjaan ( D + E ) 39,532.40

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Memasang Engsel Jendela Kupu-Kupu


Satuan / Unit : Buah
Analisa : AHSP PU A.4.6.2.6

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.0150 70,000.00 1,050.00
2 Tukang OH 0.1500 95,000.00 14,250.00
3 Kepala Tukang OH 0.0150 100,000.00 1,500.00
4 Mandor OH 0.0008 95,000.00 76.00
Jumlah Tenaga Kerja 16,876.00
B. BAHAN
1 Engsel Jendela Bh 1.0000 14,500.00 14,500.00
Jumlah Bahan 14,500.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 31,376.00
E Overhead & Profit 15.0% X D 4,706.40
F Harga Satuan Pekerjaan ( D + E ) 36,082.40
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Memasang Hak/ Kait Angin Jendela


Satuan / Unit : Buah
Analisa : AHSP PU A.4.6.2.9

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.0150 70,000.00 1,050.00
2 Tukang OH 0.1500 95,000.00 14,250.00
3 Kepala Tukang OH 0.0150 100,000.00 1,500.00
4 Mandor OH 0.0008 95,000.00 76.00
Jumlah Tenaga Kerja 16,876.00
B. BAHAN
1 Hak Angin Jendela Bh 1.0000 8,500.00 8,500.00
Jumlah Bahan 8,500.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 25,376.00
E Overhead & Profit 15.0% X D 3,806.40
F Harga Satuan Pekerjaan ( D + E ) 29,182.40

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Memasang Pacok Jendela


Satuan / Unit : Buah
Analisa : AHSP PU A.4.6.2.10

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.0150 70,000.00 1,050.00
2 Tukang OH 0.1500 95,000.00 14,250.00
3 Kepala Tukang OH 0.0150 100,000.00 1,500.00
4 Mandor OH 0.0008 95,000.00 76.00
Jumlah Tenaga Kerja 16,876.00
B. BAHAN
1 Pacok Jendela Bh 1.0000 5,500.00 5,500.00
Jumlah Bahan 5,500.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 22,376.00
E Overhead & Profit 15.0% X D 3,356.40
F Harga Satuan Pekerjaan ( D + E ) 25,732.40
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Memasang Kloset Jongkok Porselen


Satuan / Unit : Buah
Analisa : AHSP PU A.5.1.1.2

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 1.0000 70,000.00 70,000.00
2 Tukang OH 1.5000 95,000.00 142,500.00
3 Kepala Tukang OH 0.1500 100,000.00 15,000.00
4 Mandor OH 0.1600 95,000.00 15,200.00
Jumlah Tenaga Kerja 242,700.00
B. BAHAN
1 Kloset Jongkok Porselen Bh 1.0000 394,500.00 394,500.00
2 Semen Portland Kg 6.0000 1,650.00 9,900.00
3 Pasir Pasang M3 0.0100 185,000.00 1,850.00
Jumlah Bahan 406,250.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 648,950.00
E Overhead & Profit 15.0% X D 97,342.50
F Harga Satuan Pekerjaan ( D + E ) 746,292.50

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Memasang 1 Buah Urinoir


Satuan / Unit : Buah
Analisa : AHSP PU A.5.1.1.4

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 1.0000 70,000.00 70,000.00
2 Tukang OH 1.0000 95,000.00 95,000.00
3 Kepala Tukang OH 0.1000 100,000.00 10,000.00
4 Mandor OH 0.0500 95,000.00 4,750.00
Jumlah Tenaga Kerja 179,750.00
B. BAHAN
1 Urinoir Bh 1.0000 1,860,000.00 1,860,000.00
2 Semen Portland Kg 6.0000 1,650.00 9,900.00
3 Pasir Pasang M3 0.0100 185,000.00 1,850.00
4 Perlengkapan % 30.0000 558,000.00 167,400.00
Jumlah Bahan 2,039,150.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 2,218,900.00
E Overhead & Profit 15.0% X D 332,835.00
F Harga Satuan Pekerjaan ( D + E ) 2,551,735.00
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Memasang Floor Drain


Satuan / Unit : Buah
Analisa : AHSP PU A.4.5.1.14

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.0100 70,000.00 700.00
2 Tukang OH 0.1000 95,000.00 9,500.00
3 Kepala Tukang OH 0.0100 100,000.00 1,000.00
4 Mandor OH 0.0050 95,000.00 475.00
Jumlah Tenaga Kerja 11,675.00
B. BAHAN
1 Floor Drain Bh 1.0000 45,000.00 45,000.00
Jumlah Bahan 45,000.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 56,675.00
E Overhead & Profit 15.0% X D 8,501.25
F Harga Satuan Pekerjaan ( D + E ) 65,176.25

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Memasang Kran Air dia. 1/2" atau 3/4"


Satuan / Unit : Buah
Analisa : AHSP PU A.4.5.1.19

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.0100 70,000.00 700.00
2 Tukang OH 0.1000 95,000.00 9,500.00
3 Kepala Tukang OH 0.0100 100,000.00 1,000.00
4 Mandor OH 0.0050 95,000.00 475.00
Jumlah Tenaga Kerja 11,675.00
B. BAHAN
1 Kran Air 3/4" Bh 1.0000 65,000.00 65,000.00
Jumlah Bahan 65,000.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 76,675.00
E Overhead & Profit 15.0% X D 11,501.25
F Harga Satuan Pekerjaan ( D + E ) 88,176.25
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Memasang 1 m2 Kaca tebal 5 mm


Satuan / Unit : M2
Analisa : AHSP PU A.4.6.2.17

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.0150 70,000.00 1,050.00
2 Tukang OH 0.1500 95,000.00 14,250.00
3 Kepala Tukang OH 0.0150 100,000.00 1,500.00
4 Mandor OH 0.0008 95,000.00 76.00
Jumlah Tenaga Kerja 16,876.00
B. BAHAN
1 Kaca Tebal 5 mm M2 1.1000 120,000.00 132,000.00
2 Sealant Tube 0.0500 15,500.00 775.00
Jumlah Bahan 132,775.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 149,651.00
E Overhead & Profit 15.0% X D 22,447.65
F Harga Satuan Pekerjaan ( D + E ) 172,098.65

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Pengecatan Bidang Kayu lama


Satuan / Unit : M2
Analisa : AHSP PU A.4.7.1.4a

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.0700 70,000.00 4,900.00
2 Tukang OH 0.0090 95,000.00 855.00
3 Kepala Tukang OH 0.0060 100,000.00 600.00
4 Mandor OH 0.0030 95,000.00 285.00
Jumlah Tenaga Kerja 6,640.00
B. BAHAN
1 Pengencer/ Minyak cat Liter 0.0300 9,185.00 275.55
2 Cat Kayu Penutup Kg 0.1700 82,500.00 14,025.00
Jumlah Bahan 14,300.55
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 20,940.55
E Overhead & Profit 15.0% X D 3,141.08
F Harga Satuan Pekerjaan ( D + E ) 24,081.63
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Pengecatan Bidang Kayu Baru (1 x plamir, 1 x cat dasar,2 x cat penutup)
Satuan / Unit : M2
Analisa : AHSP PU A.4.7.1.4

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.0700 70,000.00 4,900.00
2 Tukang OH 0.0090 95,000.00 855.00
3 Kepala Tukang OH 0.0060 100,000.00 600.00
4 Mandor OH 0.0030 95,000.00 285.00
Jumlah Tenaga Kerja 6,640.00
B. BAHAN
1 Cat Menie Kg 0.2000 33,000.00 6,600.00
2 Plamir Kayu Kg 0.1500 15,290.00 2,293.50
3 Cat dasar kayu Kg 0.1700 25,000.00 4,250.00
4 Cat kayu penutup Kg 0.2600 82,500.00 21,450.00
5 Kuas Bh 0.0100 8,000.00 80.00
6 Pengencer Liter 0.0300 9,185.00 275.55
7 Ampelas Lembar 0.2000 9,800.00 1,960.00
Jumlah Bahan 36,909.05
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 43,549.05
E Overhead & Profit 15.0% X D 6,532.36
F Harga Satuan Pekerjaan ( D + E ) 50,081.41

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Pengecatan Tembok Baru (1 x plamir, 1 x cat dasar, 2 x cat penutup)
Satuan / Unit : M2
Analisa : AHSP PU A.4.7.1.10

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.0200 70,000.00 1,400.00
2 Tukang OH 0.0630 95,000.00 5,985.00
3 Kepala Tukang OH 0.0063 100,000.00 630.00
4 Mandor OH 0.0025 95,000.00 237.50
Jumlah Tenaga Kerja 8,252.50
B. BAHAN
1 Plamir Kg 0.1000 15,290.00 1,529.00
2 Cat dasar tembok Kg 0.1000 25,000.00 2,500.00
3 Cat tembok/penutup 2x Kg 0.2600 33,000.00 8,580.00
Jumlah Bahan 12,609.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 20,861.50
E Overhead & Profit 15.0% X D 3,129.23
F Harga Satuan Pekerjaan ( D + E ) 23,990.73
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Pengecatan Tembok lama (1 x cat dasar, 2 x cat penutup)


Satuan / Unit : M2
Analisa : AHSP PU A.4.7.1.11

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.0280 70,000.00 1,960.00
2 Tukang OH 0.0420 95,000.00 3,990.00
3 Kepala Tukang OH 0.0042 100,000.00 420.00
4 Mandor OH 0.0025 95,000.00 237.50
Jumlah Tenaga Kerja 6,607.50
B. BAHAN
1 Cat dasar tembok Kg 0.1200 25,000.00 3,000.00
2 Cat tembok/penutup 2x Kg 0.1800 33,000.00 5,940.00
Jumlah Bahan 8,940.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 15,547.50
E Overhead & Profit 15.0% X D 2,332.13
F Harga Satuan Pekerjaan ( D + E ) 17,879.63
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerj : Pemasangan 1 m2 rangka besi hollow 1 x 40.40.2 mm, modul 60 x 60 cm, plafont
Satuan / Uni: M2
Analisa : AHSP PU A. 4.2.1.21

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.3500 70,000.00 24,500.00
2 Tukang OH 0.3500 95,000.00 33,250.00
3 Kepala Tukang OH 0.0350 100,000.00 3,500.00
4 Mandor OH 0.0180 95,000.00 1,710.00
Jumlah Tenaga Kerja 62,960.00
B. BAHAN
1 Rangka metal Hollow 40.40 m' 4.0000 17,500.00 70,000.00
2 Assesories (perkuatan,las. d Ls 1.0000 10,000.00 10,000.00
Jumlah Bahan 80,000.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 142,960.00
E Overhead & Profit 15.0% X D 21,444.00
F Harga Satuan Pekerjaan ( D + E ) 164,404.00

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerj : Pemasangan 1 m2 Atap Spandek


Satuan / Uni: M2
Analisa : AHSP PU A. 4.5.2.33.a

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.2000 70,000.00 14,000.00
2 Tukang OH 0.1000 95,000.00 9,500.00
3 Kepala Tukang OH 0.0100 100,000.00 1,000.00
4 Mandor OH 0.0010 95,000.00 95.00
Jumlah Tenaga Kerja 24,595.00
B. BAHAN
1 ` m2 1.1000 58,000.00 63,800.00
2 Baut Buah 9.0000 1,000.00 9,000.00
Jumlah Bahan 72,800.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 97,395.00
E Overhead & Profit 15.0% X D 14,609.25
F Harga Satuan Pekerjaan ( D + E ) 112,004.25
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerj : Pemasangan 1 m2 Paving Block Type Hexagon


Satuan / Uni: M2
Analisa : Supl. 1

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.9600 70,000.00 67,200.00
2 Tukang OH 1.2430 95,000.00 118,085.00
3 Kepala Tukang OH 0.6560 100,000.00 65,600.00
4 Mandor OH 0.2000 95,000.00 19,000.00
Jumlah Tenaga Kerja 269,885.00
B. BAHAN
1 Paving Block Type Hexagon M2 1.0000 18,500.00 18,500.00
2 Pasir Urug M3 1.0000 89,900.00 89,900.00
Jumlah Bahan 108,400.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 378,285.00
E Overhead & Profit 15.0% X D 56,742.75
F Harga Satuan Pekerjaan ( D + E ) 435,027.75
DAFTAR UPAH DAN BAHAN

No. Nama Jenis Barang Satuan Harga

A. UPAH
1 Mandor OH 95,000.00
2 Kepala Tukang OH 100,000.00
3 Tukang OH 95,000.00
4 Pekerja OH 70,000.00
B. HARGA BAHAN
1 Air Liter 100.00
2 Batu Bata Buah 500.00
3 Batu Kali/Batu Belah (Sungai/Gunung) M³ 140,000.00
4 Batu Pecah 2 - 3 Cm M³ 350,000.00
5 Besi Beton Polos Kg 9,200.00
6 Besi Beton Ulir Kg 10,200.00
7 Besi Plat Strip Kg 16,000.00
8 Besi Baja IWF Kg 16,000.00
9 Besi Hollow 40.40.2 cm m' 17,500.00
10 Bubungan Seng Spandek M¹ 85,000.00
11 Bubungan Seng BJLS M¹ 35,000.00
12 Cat Dasar Kg 25,000.00
13 Cat Dasar Penutup Kg 32,000.00
14 Cat Kayu Mengkilat Setara Jotun Kg 82,500.00
15 Cat Menie Kg 33,000.00
16 Cat Tembok (WeatherShield) Setara Jotun Kg 33,000.00
17 Dempul Kayu Kg 28,000.00
18 Dolken Kayu ø 8 -10/400 cm Batang 28,000.00
19 Door Holder Pasang 150,000.00
20 Engsel Jendela Pasang 14,500.00
21 Engsel Pintu Pasang 17,500.00
19 Floor Drain Steinless Buah 45,000.00
20 Gypsum Board tebal 9 mm Lembar 105,000.00
21 Jaring Kawat Baja Kg 15,500.00
22 Hak Angin Pasang 8,500.00
23 Kaca Bening Uk. 2 mm M² 71,200.00
24 Kaca Bening Uk. 3 mm M² 107,200.00
25 Kaca Bening Uk. 5 mm M² 120,000.00
26 Kaca Rayband Uk. 3 mm M² 127,100.00
27 Kaca Rayband Uk. 5 mm M² 127,100.00
22 Granite 60 x 60 cm Bh 109,677.42
23 Kaso- kaso ( 5 x 7 ) cm M³ 2,500,000.00
24 Kawat Beton Kg 18,700.00
23 Kayu Klas I ( Seumantok / Ulim / dll ) M³ 6,482,550.00
24 Kayu Klas II ( Kamper / Kruing / dll ) M³ 5,255,650.00
25 Kayu Klas III ( Borneo / dll ) M³ 4,554,850.00
26 Kayu Klas IV ( Sengon / dll ) M³ 3,817,000.00
No. Nama Jenis Barang Satuan Harga

27 Keramik Sisi Kulit Jeruk 20 X 20 Cm Bh 2,773.58


28 Keramik Uk. 20 X 25 Cm Bh 3,981.25
29 Keramik Uk. 40 X 40 Cm Bh 7,541.48
30 Keramik Uk. 60 X 60 Cm Bh 67,741.94
31 Keramik Uk. 30 x 30 cm Bh 5,160.07
32 Kertas Amplas Lembar 9,800.00
33 Kerawang / Roster Buah 3,500.00
33 Kerikil M³ 185,000.00
34 Kerikil Kg 137.04
35 Kloset Duduk Keramik Buah 1,860,000.00
36 Kloset Jongkok Keramik Buah 394,500.00
37 Kran Air 3/4" Steinless Buah 65,000.00
38 Kuas Cat Buah 8,000.00
39 Kunci Pintu 2 Slaag Buah 185,000.00
40 Kunci Pintu Biasa Buah 125,000.00
41 Lampu Pijar 40 Watt Buah 12,500.00
42 Lampu HE 40 Watt Buah 75,000.00
43 Lampu TL 40 Watt Buah 145,000.00
39 Lem Kayu Kg 15,000.00
40 List Gypsum M¹ 8,500.00
41 Marmer M² 110,000.00
41 Minyak Cat Liter 9,185.00
42 Minyak Bekisting Liter 6,861.00
43 Multipleks 3 mm Lembar 73,500.00
44 Multipleks 4 mm Lembar 79,625.00
45 Multipleks 6 mm Lembar 104,125.00
46 Multipleks 9 mm Lembar 159,250.00
47 Pacok Jendela dan Ventilasi Pasang 5,500.00
47 Paku Asbes Kg 18,900.00
48 Paku Beton 8 Inci Kotak 17,000.00
49 Paku Kait Buah 1,200.00
50 Paku Kayu Kg 15,400.00
51 Paku Triplek Kg 15,400.00
52 Paku Seng Kg 20,000.00
53 Paku Sumbat Buah 1,200.00
54 Paku Sekrup Kg 24,200.00
55 Pasir Batu ( Sirtu ) M³ 185,000.00
56 Pasir Beton / M³ 185,000.00
57 Pasir Beton Kg 132.14
58 Pasir Pasang M³ 185,000.00
59 Pasir Urug M³ 89,900.00
60 Paving Block Type Hexagon M³ 18,500.00
60 Pelumas / Olie Liter 44,110.00
61 Pipa Leading Ø 1" Galvanis Tebal 3,2 mm Batang 150,000.00
62 Pipa Leading Ø 1/2" Galvanis Tebal 3,2 mm Batang 150,000.00
63 Pipa Leading Ø 1 1/2" Galvanis Tebal 3,2 mm Batang 150,000.00
64 Pipa Leading Ø 2" Galvanis Tebal 3,2 mm Batang 150,000.00
65 Pipa Leading Ø 3" Galvanis Tebal 3,2 mm Batang 150,000.00
66 Pipa Leading Ø 4" Galvanis Tebal 3,2 mm Batang 150,000.00
67 Pipa Leading Ø 6" Galvanis Tebal 3,2 mm Batang 150,000.00
68 Pipa PVC Ø 1" Batang 150,000.00
No. Nama Jenis Barang Satuan Harga

69 Pipa PVC Ø 1/2" Kualitas AWE ( United ) Batang 150,000.00


70 Pipa PVC Ø 1 1/2" Batang 150,000.00
71 Pipa PVC Ø 2" Batang 150,000.00
72 Pipa PVC Ø 3" Batang 150,000.00
73 Pipa PVC Ø 3/4" Batang 150,000.00
74 Pipa PVC Ø 4" Batang 150,000.00
60 Plamur Tembok Kg 15,290.00
61 Plin Keramik Buah 1,400.00
62 Plywood tebal 9 mm Lembar 150,000.00
63 Profil Aluminium M 15,000.00
64 Penjaga jarak bekisting/ Spacer Bh 25,000.00
65 Residu Kg 6,500.00
66 Reservoir Air 0,5 M3 Fibre Buah 1,751,800.00
67 Reservoir Air 1 M3 Fibre Buah 2,707,800.00
68 Reservoir Air 0,5 M3 Stainless Steel Buah 2,070,600.00
69 Seal Tape Buah 4,000.00
70 Schakelar Buah 26,900.00
66 Semen @ 50 Kg Zak 66,000.00
67 Semen @ 50 Kg Kg 1,320.00
68 Semen @ 40 Kg Zak 53,000.00
69 Semen Putih @ 50 Kg Zak 185,000.00
70 Semen Warna Kg 165,000.00
71 Seng Genteng tebal 0.3 mm Lbr 95,000.00
72 Seng BJLS 0,20 Cat Pabrik M² 85,000.00
73 Seng Gelombang BJLS 30 M² 55,700.00
74 Seng Gelombang BJLS 30 Cat Pabrik M² 71,200.00
75 Seng Plat BJLS 20 M² 49,900.00
76 Seng Plat BJLS 30 M² 69,300.00
77 Solar ( Industri ) Liter 9,570.00
78 Stut Werk (Ska Folding) M³ 2,857,000.00
79 Sekrup fixer Buah 500.00
80 Sealant Kg 15,500.00
81 Sumur + Pompa Tangan Terpasang Unit 1,317,200.00
82 Seng Spandek 0,3 Pabrikan M² 58,000.00
72 Tanah Timbun M³ 45,000.00
73 Teralis Besi M² 436,900.00
73 Titik Lampu + Instalasi Titik 160,000.00
74 Tripleks tebal 4 mm Lembar 87,000.00
C. ALAT
1 Stamper Hari-Sewa 120,000.00
2 Dump Truck Jam 200,000.00
3
DAFTAR ANALISA HARGA SATUAN

Pekerjaan KONSTRUKSI FISIK PEMBANGUNAN PERTOKOAN TRINGGADENG 2 LANTAI


Lokasi TRIENGGADENG - KAB. PIDIE JAYA
Prop / Kab DINAS PERINDUSTRIAN DAN PERDAGANGAN ACEH
Tahun Anggaran 2018

PEKERJAAN PERSIAPAN
RSNI.T-12-2002(B.8)
1m2 Membersihkan Lapangan dan Perataan
Upah : 0.100 OH Pekerja @ Rp. 70,000.00 Rp. 7,000.00
0.050 OH Mandor @ Rp. 95,000.00 Rp. 4,750.00
Jumlah Rp. 11,750.00
Dibulatkan Rp. 11,750.00
RSNI.T-12-2002(B.4)
1m1 Pengukuran dan Pemasangan Bouwplank
Upah : 0.100 OH Pekerja @ Rp. 70,000.00 Rp. 7,000.00
0.100 OH Tukang @ Rp. Err:509 Rp. Err:509
0.010 OH Kepala Tukang @ Rp. Err:509 Rp. Err:509
0.050 OH Mandor @ Rp. 95,000.00 Rp. 4,750.00
Bahan : 0.020 Kg Paku Kayu @ Rp. 15,400.00 Rp. 308.00
0.012 M3 Kayu Kelas III/Bekisting @ Rp. 4,554,850.00 Rp. 54,658.20
0.007 M3 Papan Kayu Kelas III @ Rp. 4,554,850.00 Rp. 31,883.95
Jumlah Upah + Bahan Rp. Err:509
Dibulatkan Rp. Err:509

PEKERJAAN TANAH

SNI.2835-2008-6.1
1m3 Galian tanah biasa sedalam 1 Meter
Upah : 0.750 OH Pekerja @ Rp. 70,000.00 Rp. 52,500.00
0.025 OH Mandor @ Rp. 95,000.00 Rp. 2,375.00
Jumlah Rp. 54,875.00
Dibulatkan Rp. 54,875.00
SNI.2835-2008-6.2
1m3 Galian tanah biasa sedalam 2 Meter
Upah : 0.900 OH Pekerja @ Rp. 70,000.00 Rp. 63,000.00
0.045 OH Mandor @ Rp. 95,000.00 Rp. 4,275.00
Jumlah Rp. 67,275.00
Dibulatkan Rp. 67,275.00
SNI.2835-2008-6.9
1m3 Urugan kembali Galian Tanah (1/3 Galian Tanah) Rp. 22,425.00
Upah : 0.250 OH Pekerja @ Rp. 70,000.00 Rp. 17,500.00
0.008 OH Mandor @ Rp. 95,000.00 Rp. 791.67
Jumlah Rp. 18,291.67
Dibulatkan Rp. 18,292.00

SNI.2835-2008-6.10
1 m3 Timbunan tanah

Upah : 0.500 OH Pekerja @ Rp. 70,000.00 Rp. 35,000.00


0.050 OH Mandor @ Rp. 95,000.00 Rp. 4,750.00
Bahan : 1.200 m3 Tanah timbunan @ Rp. 45,000.00 Rp. 54,000.00
Jumlah Upah + Bahan Rp. 93,750.00
Dibulatkan Rp. 93,750.00

SNI.2835-2008-6.11
1 m3 Urugan pasir
Upah : 0.300 OH Pekerja @ Rp. 70,000.00 Rp. 21,000.00
0.010 OH Mandor @ Rp. 95,000.00 Rp. 950.00
Bahan : 1.200 M3 Pasir urug @ Rp. 89,900.00 Rp. 107,880.00
Jumlah Bahan Rp. 129,830.00
Dibulatkan Rp. 129,830.00
PEKERJAAN PONDASI
SNI.2835-2008-6.1
1m3 Pondasi batu belah, campuran 1 PC : 3 PP
Upah : 1.500 OH Pekerja @ Rp. 70,000.00 Rp. 105,000.00
0.600 OH Tukang @ Rp. Err:509 Rp. Err:509
0.060 OH Kepala tukang @ Rp. Err:509 Rp. Err:509
0.075 OH Mandor @ Rp. 95,000.00 Rp. 7,125.00
Bahan : 1.200 m3 Batu belah 15cm/20cm @ Rp. 140,000.000 Rp. 168,000.00
0.485 m3 Pasir pasang @ Rp. 185,000.000 Rp. 89,725.00
202.000 Kg Semen Portland @ Rp. 1,650.00 Rp. 333,300.00
Jumlah Upah + Bahan Rp. Err:509
Dibulatkan Rp. Err:509

SNI.2836-2008-6.9
1 m3 Pasangan batu Kosong (Aamstamping)
Upah : 0.780 Org Pekerja @ Rp. 70,000.00 Rp. 54,600.00
0.390 Org Tukang @ Rp. Err:509 Rp. Err:509
0.039 Org Kepala tukang @ Rp. Err:509 Rp. Err:509
0.039 Org Mandor @ Rp. 95,000.00 Rp. 3,705.00
Bahan : 1.200 m3 Batu gunung/kali @ Rp. 140,000.00 Rp. 168,000.00
0.432 m3 Pasir Urug @ Rp. 89,900.00 Rp. 38,836.80
Jumlah Upah + Bahan Rp. Err:509
Dibulatkan Rp. Err:509

DAFTAR ANALISA HARGA SATUAN


Pekerjaan KONSTRUKSI FISIK PEMBANGUNAN PERTOKOAN TRINGGADENG 2 LANTAI
Lokasi TRIENGGADENG - KAB. PIDIE JAYA
Prop / Kab DINAS PERINDUSTRIAN DAN PERDAGANGAN ACEH
Tahun Anggaran 2018

PEKERJAAN BETON
SNI.7394-2008-6.4
1m3 Lantai Kerja Beton mutu ρc= 7.4 Mpa(K100),slump (3-6) cm, w/c =0,87
Upah : 1.650 OH Pekerja @ Rp. 70,000.00 Rp. 115,500.00
0.275 OH Tukang @ Rp. Err:509 Rp. Err:509
0.280 OH Kepala tukang @ Rp. Err:509 Rp. Err:509
0.830 OH Mandor @ Rp. 95,000.00 Rp. 78,850.00
Jumlah Rp. Err:509

Bahan : 869.000 Kg Pasir beton @ Rp. 115.63 Rp. 100,478.13


999.000 Kg Kerikil beton @ Rp. 125.90 Rp. 125,773.38
247.000 Kg Semen Portland @ Rp. 1,650.00 Rp. 407,550.00
215.000 ltr Air @ Rp. 100.00 Rp. 21,500.00
Jumlah Bahan Rp. 655,301.51
Jumlah Upah + Bahan Rp. Err:509
Dibulatkan Rp. Err:509
SNI.7394-2008-6.8
1m3 Beton mutu ρc= 21.7 Mpa(K250),slump (12 ± 2) cm, w/c =0,56
Upah : 1.650 OH Pekerja @ Rp. 70,000.00 Rp. 115,500.00
0.275 OH Tukang @ Rp. Err:509 Rp. Err:509
0.028 OH Kepala tukang @ Rp. Err:509 Rp. Err:509
0.083 OH Mandor @ Rp. 95,000.00 Rp. 7,885.00
Bahan : 692.000 Kg Pasir beton @ Rp. 115.63 Rp. 80,012.50
1,039.000 Kg Kerikil beton/Batu split(Maximum 30 mm) @ Rp. 125.90 Rp. 130,809.35
384.000 Kg Semen Portland @ Rp. 1,650.00 Rp. 633,600.00
215.000 ltr Air @ Rp. 50.00 Rp. 10,750.00
Jumlah Upah + Bahan Rp. Err:509
Dibulatkan Rp. Err:509
SNI.7394-2008-6.17
1 Kg Besi Ulir / Polos
Upah : 0.007 OH Pekerja @ Rp. 70,000.00 Rp. 490.00
0.007 OH Tukang @ Rp. Err:509 Rp. Err:509
0.0010 OH Kepala tukang @ Rp. Err:509 Rp. Err:509
0.0040 OH Mandor @ Rp. 95,000.00 Rp. 380.00
Bahan : 1.050 Kg Besi beton @ Rp. 9,200.00 Rp. 9,660.00
0.015 Kg Kawat beton @ Rp. 18,700.00 Rp. 280.50
Jumlah Upah + Bahan Rp. Err:509
Dibulatkan Rp. Err:509
SNI.7394-2008-6.19
1 Kg Jaring Kawat Baja/Wiremesh
Upah : 0.025 OH Pekerja @ Rp. 70,000.00 Rp. 1,750.00
0.250 OH Tukang @ Rp. Err:509 Rp. Err:509
0.0250 OH Kepala tukang @ Rp. Err:509 Rp. Err:509
0.0010 OH Mandor @ Rp. 95,000.00 Rp. 95.00
Bahan : 1.020 Kg Jaring kawat baja Las pabrik @ Rp. Err:509 Rp. Err:509
0.050 Kg Kawat Las @ Rp. 18,700.00 Rp. 935.00
Jumlah Upah + Bahan Rp. Err:509
Dibulatkan Rp. Err:509
SNI.7394-2008-6.20
1 m2 Cetakan Beton/Bekisting untuk Pondasi

Upah : 0.520 OH Pekerja @ Rp. 70,000.00 Rp. 36,400.00


0.260 OH Tukang @ Rp. Err:509 Rp. Err:509
0.026 OH Kepala tukang @ Rp. Err:509 Rp. Err:509
0.026 OH Mandor @ Rp. 95,000.00 Rp. 2,470.00
Bahan : 0.040 m3 Kayu Kelas III @ Rp. 4,554,850.00 Rp. 182,194.00
0.300 Kg Paku 5 cm - 10 cm @ Rp. 15,400.00 Rp. 4,620.00
0.100 Ltr Minyak bekisting @ Rp. 6,861.00 Rp. 686.10
Jumlah Upah + Bahan Rp. Err:509
Dibulatkan Rp. Err:509
SNI.7394-2008-6.21
1 m2 Cetakan Beton /Bekisting untuk Sloof

Upah : 0.520 OH Pekerja @ Rp. 70,000.00 Rp. 36,400.00


0.260 OH Tukang batu @ Rp. Err:509 Rp. Err:509
0.026 OH Kepala tukang @ Rp. Err:509 Rp. Err:509
0.026 OH Mandor @ Rp. 95,000.00 Rp. 2,470.00
Bahan : 0.045 m3 Papan Kayu Kelas III @ Rp. 4,554,850.00 Rp. 204,968.25
0.300 Kg Paku 5 cm - 10 cm @ Rp. 15,400.00 Rp. 4,620.00
0.100 Ltr Minyak bekisting @ Rp. 6,861.00 Rp. 686.10
Jumlah Upah + Bahan Rp. Err:509
Dibulatkan Rp. Err:509

SNI.7394-2008-6.22
1 m2 Cetakan Beton /Bekisting untuk Kolom

Upah : 0.660 OH Pekerja @ Rp. 70,000.00 Rp. 46,200.00


0.330 OH Tukang batu @ Rp. Err:509 Rp. Err:509
0.033 OH Kepala tukang @ Rp. Err:509 Rp. Err:509
0.033 OH Mandor @ Rp. 95,000.00 Rp. 3,135.00
Bahan : 0.040 m3 Kayu Kelas III @ Rp. 4,554,850.00 Rp. 182,194.00
0.400 Kg Paku 5 cm - 10 cm @ Rp. 15,400.00 Rp. 6,160.00
0.200 Ltr Minyak bekisting @ Rp. 6,861.00 Rp. 1,372.20
0.015 m3 Balok Kayu Kelas II @ Rp. 5,255,650.00 Rp. 78,834.75
0.350 lbr Plywood tebal 9 mm @ Rp. 150,000.00 Rp. 52,500.00
2.000 Btg Dolken Kayu ø 8 -10/400 cm @ Rp. 28,000.00 Rp. 56,000.00
Jumlah Upah + Bahan Rp. Err:509
untuk 3 x pakai (total harga x 1/3 Rp. Err:509
Dibulatkan Rp. Err:509
SNI.7394-2008-6.23
1 m2 Cetakan Beton /Bekisting untuk Balok
Upah : 0.660 OH Pekerja @ Rp. 70,000.00 Rp. 46,200.00
0.330 OH Tukang batu @ Rp. Err:509 Rp. Err:509
0.033 OH Kepala tukang @ Rp. Err:509 Rp. Err:509
0.033 OH Mandor @ Rp. 95,000.00 Rp. 3,135.00
Bahan : 0.040 m3 Kayu Kelas III @ Rp. 4,554,850.00 Rp. 182,194.00
0.400 Kg Paku 5 cm - 12 cm @ Rp. 15,400.00 Rp. 6,160.00
0.200 Ltr Minyak bekisting @ Rp. 6,861.00 Rp. 1,372.20
0.018 m3 Balok Kayu Kelas II @ Rp. 5,255,650.00 Rp. 94,601.70
0.350 lbr Plywood tebal 9 mm @ Rp. 150,000.00 Rp. 52,500.00
2.000 Btg Dolken Kayu ø 8 -10/400 cm @ Rp. 28,000.00 Rp. 56,000.00
Jumlah Upah + Bahan Rp. Err:509
untuk 3 x pakai (total harga x 1/3 Rp. Err:509
Dibulatkan Rp. Err:509

SNI.7394-2008-6.24
1 m2 Cetakan Beton /Bekisting untuk Lantai

Upah : 0.660 OH Pekerja @ Rp. 70,000.00 Rp. 46,200.00


0.330 OH Tukang batu @ Rp. Err:509 Rp. Err:509
0.033 OH Kepala tukang @ Rp. Err:509 Rp. Err:509
0.033 OH Mandor @ Rp. 95,000.00 Rp. 3,135.00
Bahan : 0.040 m3 Kayu Kelas III @ Rp. 4,554,850.00 Rp. 182,194.00
0.400 Kg Paku 5 cm - 10 cm @ Rp. 15,400.00 Rp. 6,160.00
0.200 Ltr Minyak bekisting @ Rp. 6,861.00 Rp. 1,372.20
0.015 m3 Balok Kayu Kelas II @ Rp. 5,255,650.00 Rp. 78,834.75
0.350 Lbr Plywood tebal 9 mm @ Rp. 150,000.00 Rp. 52,500.00
6.000 Btg Dolken Kayu ø 8 -10/400 cm @ Rp. 28,000.00 Rp. 168,000.00
Jumlah Upah + Bahan Rp. Err:509
untuk 2 x pakai (total harga x 1/2 Rp. Err:509
Dibulatkan Rp. Err:509

SNI.7394-2008-6.26
1 m2 Cetakan Beton /Bekisting untuk Tangga
Upah : 0.660 OH Pekerja @ Rp. 70,000.00 Rp. 46,200.00
0.330 OH Tukang batu @ Rp. Err:509 Rp. Err:509
0.033 OH Kepala tukang @ Rp. Err:509 Rp. Err:509
0.033 OH Mandor @ Rp. 95,000.00 Rp. 3,135.00
Bahan : 0.030 m3 Kayu Kelas III @ Rp. 4,554,850.00 Rp. 136,645.50
0.400 Kg Paku 5 cm - 10 cm @ Rp. 15,400.00 Rp. 6,160.00
0.150 Ltr Minyak bekisting @ Rp. 6,861.00 Rp. 1,029.15
0.015 m3 Balok Kayu Kelas II @ Rp. 5,255,650.00 Rp. 78,834.75
0.350 Lbr Plywood Tebal 9 mm @ Rp. 150,000.00 Rp. 52,500.00
2.000 Btg Dolken Kayu ø 8 -10/400 cm @ Rp. 28,000.00 Rp. 56,000.00
Jumlah Upah + Bahan Rp. Err:509
untuk 2 x pakai (total harga x 1/2 Rp. Err:509
Dibulatkan Rp. Err:509

REKAPITULASI PEKERJAAN BETON


SUPLEMEN SNI 7394-2008 A
1m3 Beton Bertulang Kolom Pedestal 40/40 Cm
1.010 m3 Beton K250 (SNI DT-91-0008-2008-6.7) @ Rp. Err:509 Rp. Err:509
194.727 Kg Pembesian (SNIDT-91-0008-2008-6.17) @ Rp. Err:509 Rp. Err:509
10.0000 m2 Bekisting (SNI.DT-91-0008-2008-6.20) @ Rp. Err:509 Rp. Err:509
Jumlah Rp. Err:509
Dibulatkan Rp. Err:509

SUPLEMEN SNI 7394-2008 B


1m3 Beton Bertulang Pondasi Tapak 80 x 180 cm
1.010 m3 Beton K250 (SNI DT-91-0008-2008-6.7) @ Rp. Err:509 Rp. Err:509
115.000 Kg Pembesian (SNIDT-91-0008-2008-6.17) @ Rp. Err:509 Rp. Err:509
1.9440 m2 Bekisting (SNI.DT-91-0008-2008-6.20) @ Rp. Err:509 Rp. Err:509
Jumlah Rp. Err:509
Dibulatkan Rp. Err:509
SUPLEMEN SNI 7394-2008 B.a
1m3 Beton Bertulang Pondasi Tapak 100 x 100 cm
1.010 m3 Beton K250 (SNI DT-91-0008-2008-6.7) @ Rp. Err:509 Rp. Err:509
84.300 Kg Pembesian (SNIDT-91-0008-2008-6.17) @ Rp. Err:509 Rp. Err:509
1.9440 m2 Bekisting (SNI.DT-91-0008-2008-6.20) @ Rp. Err:509 Rp. Err:509
Jumlah Rp. Err:509
Dibulatkan Rp. Err:509
SUPLEMEN SNI 7394-2008 C
1m3 Beton Bertulang Sloof 25x 40 cm
1.010 m3 Beton K250 (SNI DT-91-0008-2008-6.7) @ Rp. Err:509 Rp. Err:509
131.379 kg Pembesian (SNIDT-91-0008-2008-6.17) @ Rp. Err:509 Rp. Err:509
10.5000 m2 Bekisting (SNI.DT-91-0008-2007-6.21) @ Rp. Err:509 Rp. Err:509
Jumlah Rp. Err:509
Dibulatkan Rp. Err:509
SUPLEMEN SNI 7394-2008 C.a
1m3 Beton Bertulang Sloof 20x 30 cm
1.010 m3 Beton K250 (SNI DT-91-0008-2008-6.7) @ Rp. Err:509 Rp. Err:509
154.310 kg Pembesian (SNIDT-91-0008-2008-6.17) @ Rp. Err:509 Rp. Err:509
10.2300 m2 Bekisting (SNI.DT-91-0008-2007-6.21) @ Rp. Err:509 Rp. Err:509
Jumlah Rp. Err:509
Dibulatkan Rp. Err:509
SUPLEMEN SNI 7394-2008 D
1m3 Beton Bertulang Kolom Persegi Delapan
1.010 m3 Beton K250 (SNI DT-91-0008-2008-6.7) @ Rp. Err:509 Rp. Err:509
145.761 kg Pembesian (SNIDT-91-0008-2008-6.17) @ Rp. Err:509 Rp. Err:509
7.143 m2 Bekisting (SNI.DT-91-0008-2007-6.22) @ Rp. Err:509 Rp. Err:509
Jumlah Rp. Err:509
Dibulatkan Rp. Err:509
SUPLEMEN SNI 7394-2008 A
1m3 Beton Bertulang Kolom 30 x 50 cm
1.010 m3 Beton K250 (SNI DT-91-0008-2008-6.7) @ Rp. Err:509 Rp. Err:509
152.495 kg Pembesian (SNIDT-91-0008-2008-6.17) @ Rp. Err:509 Rp. Err:509
10.6667 m2 Bekisting (SNI.DT-91-0008-2007-6.22) @ Rp. Err:509 Rp. Err:509
Jumlah Rp. Err:509
Dibulatkan Rp. Err:509
SUPLEMEN SNI 7394-2008 A1
1m3 Beton Bertulang Kolom 30 x 40 cm
1.010 m3 Beton K250 (SNI DT-91-0008-2008-6.7) @ Rp. Err:509 Rp. Err:509
191.156 kg Pembesian (SNIDT-91-0008-2008-6.17) @ Rp. Err:509 Rp. Err:509
11.4286 m2 Bekisting (SNI.DT-91-0008-2007-6.22) @ Rp. Err:509 Rp. Err:509
Jumlah Rp. Err:509
Dibulatkan Rp. Err:509
SUPLEMEN SNI 7394-2008 B
1m3 Beton Bertulang Kolom Praktis 13x13 cm
1.010 m3 Beton K250 (SNI DT-91-0008-2008-6.7) @ Rp. Err:509 Rp. Err:509
252.032 kg Pembesian (SNIDT-91-0008-2008-6.17) @ Rp. Err:509 Rp. Err:509
15.385 m2 Bekisting (SNI.DT-91-0008-2007-6.22) @ Rp. Err:509 Rp. Err:509
Jumlah Rp. Err:509
Dibulatkan Rp. Err:509
SUPLEMEN SNI 7394-2008 C
1m3 Beton Bertulang Balok 25 x 40 cm
1.010 m3 Beton K250 (SNI DT-91-0008-2008-6.7) @ Rp. Err:509 Rp. Err:509
207.421 kg Pembesian (SNIDT-91-0008-2008-6.17) @ Rp. Err:509 Rp. Err:509
10.500 m2 Bekisting (SNI.DT-91-0008-2007-6.23) @ Rp. Err:509 Rp. Err:509
Jumlah Rp. Err:509
Dibulatkan Rp. Err:509
SUPLEMEN SNI 7394-2008 D
1m3 Beton Bertulang Balok Anak 20 x 30 cm
1.010 m3 Beton K250 (SNI DT-91-0008-2008-6.7) @ Rp. Err:509 Rp. Err:509
153.993 kg Pembesian (SNIDT-91-0008-2008-6.17) @ Rp. Err:509 Rp. Err:509
12.857 m2 Bekisting (SNI.DT-91-0008-2007-6.23) @ Rp. Err:509 Rp. Err:509
Jumlah Rp. Err:509
Dibulatkan Rp. Err:509
SUPLEMEN SNI 7394-2008 E
1m3 Beton Bertulang Ring Balok 20 x 30 cm
1.010 m3 Beton K250 (SNI DT-91-0008-2008-6.7) @ Rp. Err:509 Rp. Err:509
153.993 kg Pembesian (SNIDT-91-0008-2008-6.17) @ Rp. Err:509 Rp. Err:509
12.857 m2 Bekisting (SNI.DT-91-0008-2007-6.23) @ Rp. Err:509 Rp. Err:509
Jumlah Rp. Err:509
Dibulatkan Rp. Err:509
SUPLEMEN SNI 7394-2008 F
1m3 Beton Bertulang Balok latai 13x15 cm
1.010 m3 Beton K250 (SNI DT-91-0008-2008-6.7) @ Rp. Err:509 Rp. Err:509
197.192 kg Pembesian (SNIDT-91-0008-2008-6.17) @ Rp. Err:509 Rp. Err:509
20.385 m2 Bekisting (SNI.DT-91-0008-2007-6.22) @ Rp. Err:509 Rp. Err:509
Jumlah Rp. Err:509
Dibulatkan Rp. Err:509
SUPLEMEN SNI 7394-2008 G
1m3 Beton Bertulang Balok Tombak Layar 15 x 25 cm
1.010 m3 Beton K250 (SNI DT-91-0008-2008-6.7) @ Rp. Err:509 Rp. Err:509
238.120 kg Pembesian (SNIDT-91-0008-2008-6.17) @ Rp. Err:509 Rp. Err:509
17.333 m2 Bekisting (SNI.DT-91-0008-2007-6.22) @ Rp. Err:509 Rp. Err:509
Jumlah Rp. Err:509
Dibulatkan Rp. Err:509
SUPLEMEN SNI 7394-2008 H
1m3 Beton Bertulang Balok Bordes Tangga 20x 63 cm
1.010 m3 Beton K250 (SNI DT-91-0008-2008-6.7) @ Rp. Err:509 Rp. Err:509
201.452 kg Pembesian (SNIDT-91-0008-2008-6.17) @ Rp. Err:509 Rp. Err:509
14.921 m2 Bekisting (SNI.DT-91-0008-2007-6.23) @ Rp. Err:509 Rp. Err:509
Jumlah Rp. Err:509
Dibulatkan Rp. Err:509
SUPLEMEN SNI 7394-2008 I
1m3 Beton Bertulang Plat Lantai T= 12 cm
1.010 m3 Beton K250 (SNI DT-91-0008-2008-6.7) @ Rp. Err:509 Rp. Err:509
62.000 kg Pembesian (SNIDT-91-0008-2008-6.17) @ Rp. Err:509 Rp. Err:509
8.333 m2 Bekisting (SNI.DT-91-0008-2007-6.24) @ Rp. Err:509 Rp. Err:509
Jumlah Rp. Err:509
Dibulatkan Rp. Err:509

SUPLEMEN SNI 7394-2008 L


1m3 Top Gavel 13/15 cm
1.000 m3 Beton K250 (SNI DT-91-0008-2008-6.7) @ Rp. Err:509 Rp. Err:509
197.192 kg Pembesian (SNIDT-91-0008-2008-6.17) @ Rp. Err:509 Rp. Err:509
8.718 m2 Bekisting (SNI.DT-91-0008-2007-6.22) @ Rp. Err:509 Rp. Err:509
Jumlah Rp. Err:509
Dibulatkan Rp. Err:509
SUPLEMEN SNI 7394-2008 J
1m3 Beton Bertulang Plat Dak T= 10 cm
1.010 m3 Beton K250 (SNI DT-91-0008-2008-6.7) @ Rp. Err:509 Rp. Err:509
72.000 kg Pembesian (SNIDT-91-0008-2008-6.17) @ Rp. Err:509 Rp. Err:509
10.000 m2 Bekisting (SNI.DT-91-0008-2007-6.24) @ Rp. Err:509 Rp. Err:509
Jumlah Rp. Err:509
Dibulatkan Rp. Err:509
SUPLEMEN SNI 7394-2008 K
1m3 Beton Bertulang Kanopi T= 8 cm
1.010 m3 Beton K250 (SNI DT-91-0008-2008-6.7) @ Rp. Err:509 Rp. Err:509
89.000 kg Pembesian (SNIDT-91-0008-2008-6.17) @ Rp. Err:509 Rp. Err:509
11.000 m2 Bekisting (SNI.DT-91-0008-2007-6.24) @ Rp. Err:509 Rp. Err:509
Jumlah Rp. Err:509
Dibulatkan Rp. Err:509
SUPLEMEN SNI 7394-2008 L
1m3 Beton Bertulang Tangga
1.000 m3 Beton K250 (SNI DT-91-0008-2008-6.7) @ Rp. Err:509 Rp. Err:509
281.000 kg Pembesian (SNIDT-91-0008-2008-6.17) @ Rp. Err:509 Rp. Err:509
8.898 m2 Bekisting (SNI.DT-91-0008-2007-6.24) @ Rp. Err:509 Rp. Err:509
Jumlah Rp. Err:509
Dibulatkan Rp. Err:509
SUPLEMEN SNI 7394-2008 M
1m3 Beton Bertulang Balok 13 x 13 cm
1.000 m3 Beton K250 (SNI DT-91-0008-2008-6.7) @ Rp. Err:509 Rp. Err:509
120.000 kg Pembesian (SNIDT-91-0008-2008-6.17) @ Rp. Err:509 Rp. Err:509
7.000 m2 Bekisting (SNI.DT-91-0008-2007-6.23) @ Rp. Err:509 Rp. Err:509
Jumlah Rp. Err:509
Dibulatkan Rp. Err:509

PEKERJAAN DINDING

SNI.6897-2008-6.7
1m2 Pasangan Dinding Batu bata teb. 1/2 bata, 1Pc : 2 PP.

Upah : 0.300 OH Pekerja @ Rp. 70,000.00 Rp. 21,000.00


0.100 OH Tukang batu @ Rp. Err:509 Rp. Err:509
0.010 OH Kepala tukang @ Rp. Err:509 Rp. Err:509
0.015 OH Mandor @ Rp. 95,000.00 Rp. 1,425.00
Bahan : 0.038 m3 Pasir pasang @ Rp. 185,000.00 Rp. 7,030.00
70.000 Bh Bata merah @ Rp. 500.00 Rp. 35,000.00
18.950 kg Semen Portland @ Rp. 1,650.00 Rp. 31,267.50
Jumlah Upah + Bahan Rp. Err:509
Dibulatkan Rp. Err:509
SNI.6897-2008-6.9
1m2 Pasangan Dinding Batu bata tebal 1/2 bata adukan, 1Pc : 4 PP
Upah : 0.300 OH Pekerja @ Rp. 70,000.00 Rp. 21,000.00
0.100 OH Tukang @ Rp. Err:509 Rp. Err:509
0.010 OH Kepala tukang @ Rp. Err:509 Rp. Err:509
0.015 OH Mandor @ Rp. 95,000.00 Rp. 1,425.00
Bahan : 0.043 m3 Pasir pasang @ Rp. 185,000.00 Rp. 7,955.00
70.000 Bh Bata merah @ Rp. 500.00 Rp. 35,000.00
11.500 kg Semen Portland @ Rp. 1,650.00 Rp. 18,975.00
Jumlah Upah + Bahan Rp. Err:509
Dibulatkan Rp. Err:509
PEKERJAAN PLESTERAN
SNI.2837-2008-6.2
1m2 Plesteran, 1Pc : 2 PP tebal 15 mm
Upah : 0.300 OH Pekerja @ Rp. 70,000.00 Rp. 21,000.00
0.150 OH Tukang @ Rp. Err:509 Rp. Err:509
0.015 OH Kepala tukang @ Rp. Err:509 Rp. Err:509
0.015 OH Mandor @ Rp. 95,000.00 Rp. 1,425.00
Bahan : 0.020 m3 Pasir pasang @ Rp. 185,000.00 Rp. 3,700.00
10.224 kg Semen Portland @ Rp. 1,650.00 Rp. 16,869.60
Jumlah Upah + Bahan Rp. Err:509
Dibulatkan Rp. Err:509

SNI.2837-2008-6.4
1m2 Plesteran, 1Pc :4 PP tebal 13 mm
Upah : 0.200 OH Pekerja @ Rp. 70,000.00 Rp. 14,000.00
0.150 OH Tukang @ Rp. Err:509 Rp. Err:509
0.015 OH Kepala tukang @ Rp. Err:509 Rp. Err:509
0.010 OH Mandor @ Rp. 95,000.00 Rp. 950.00
Bahan : 0.024 m3 Pasir pasang @ Rp. 185,000.00 Rp. 4,440.00
6.240 kg Semen Portland @ Rp. 1,650.00 Rp. 10,296.00
Jumlah Upah + Bahan Rp. Err:509
Dibulatkan Rp. Err:509

SNI.2837-2008-6.27
1m2 Acian Semen Portland
Upah : 0.200 OH Pekerja @ Rp. 70,000.00 Rp. 14,000.00
0.100 OH Tukang @ Rp. Err:509 Rp. Err:509
0.010 OH Kepala tukang @ Rp. Err:509 Rp. Err:509
0.010 OH Mandor @ Rp. 95,000.00 Rp. 950.00
Bahan : 3.250 Kg Semen Portland @ Rp. 1,650.00 Rp. 5,362.50
Jumlah Upah + Bahan Rp. Err:509
Dibulatkan Rp. Err:509

PEKERJAAN LANTAI
SNI.7395-2008-6.13
Memasang 1 m2 Lantai Granite 60 x 60 cm
Upah : 0.700 OH Pekerja @ Rp. 70,000.00 Rp. 49,000.00
0.350 OH Tukang @ Rp. Err:509 Rp. Err:509
0.035 OH Kepala Tukang @ Rp. Err:509 Rp. Err:509
0.035 OH Mandor @ Rp. 95,000.00 Rp. 3,325.00
Jumlah Rp. Err:509

Bahan : 0.045 m3 Pasir Pasang @ Rp. 185,000.00 Rp. 8,325.00


3.100 bh Ganite 60 x 60 cm @ Rp. 5,160.07 Rp. 15,996.21
9.600 Kg Semen Portland @ Rp. 1,650.00 Rp. 15,840.00
1.500 Kg Semen Warna @ Rp. 165,000.00 Rp. 247,500.00
Jumlah Bahan Rp. 287,661.21
Jumlah Upah + Bahan Rp. Err:509
Dibulatkan Rp. Err:509
SNI.7395-2008-6.34 (a)
Memasang 1 m2 Lantai Keramik 40 x40 cm
Upah : 0.700 OH Pekerja @ Rp. 70,000.00 Rp. 49,000.00
0.350 OH Tukang @ Rp. Err:509 Rp. Err:509
0.035 OH Kepala Tukang @ Rp. Err:509 Rp. Err:509
0.035 OH Mandor @ Rp. 95,000.00 Rp. 3,325.00
Jumlah Rp. Err:509

Bahan : 0.045 m3 Pasir Pasang @ Rp. 185,000.00 Rp. 8,325.00


6.250 Bh Keramik 40 x 40 cm @ Rp. 7,541.48 Rp. 47,134.24
10.400 Kg Semen Portland @ Rp. 1,650.00 Rp. 17,160.00
1.620 Kg Semen Warna @ Rp. 165,000.00 Rp. 267,300.00
Jumlah Bahan Rp. 339,919.24
Jumlah Upah + Bahan Rp. Err:509
Dibulatkan Rp. Err:509
SNI.7395-2008-6.36 (a)
Memasang 1 m2 Lantai Keramik kmr. Mandi 20 x 20 cm
Upah : 0.900 OH Pekerja @ Rp. 70,000.00 Rp. 63,000.00
0.450 OH Tukang @ Rp. Err:509 Rp. Err:509
0.045 OH Kepala Tukang @ Rp. Err:509 Rp. Err:509
0.045 OH Mandor @ Rp. 95,000.00 Rp. 4,275.00
Jumlah Rp. Err:509

Bahan : 0.045 m3 Pasir Pasang @ Rp. 185,000.00 Rp. 8,325.00


25.000 Bh Keramik 20 x 20 cm (Kualitas I) @ Rp. 2,773.58 Rp. 69,339.62
10.400 Kg Semen Portland @ Rp. 1,650.00 Rp. 17,160.00
1.620 Kg Semen Warna @ Rp. 165,000.00 Rp. 267,300.00
Jumlah Bahan Rp. 362,124.62
Jumlah Upah + Bahan Rp. Err:509
Dibulatkan Rp. Err:509

SNI.7395-2008-6.54 (a)
Memasang 1 m2 Dinding Keramik kmr. Mandi 20 x 25 cm
Upah : 0.900 OH Pekerja @ Rp. 70,000.00 Rp. 63,000.00
0.450 OH Tukang @ Rp. Err:509 Rp. Err:509
0.045 OH Kepala Tukang @ Rp. Err:509 Rp. Err:509
0.045 OH Mandor @ Rp. 95,000.00 Rp. 4,275.00
Jumlah Rp. Err:509

Bahan : 0.045 m3 Pasir Pasang @ Rp. 185,000.00 Rp. 8,325.00


20.000 Bh Keramik 20 x 25 cm (Kualitas I) @ Rp. 3,981.25 Rp. 79,625.00
10.400 Kg Semen Portland @ Rp. 1,650.00 Rp. 17,160.00
1.620 Kg Semen Warna @ Rp. 165,000.00 Rp. 267,300.00
Jumlah Bahan Rp. 372,410.00
Jumlah Upah + Bahan Rp. Err:509
Dibulatkan Rp. Err:509

SNI.7395-2008-6.40
Memasang 1m' plin kramik 10 x 10
Upah : 0.090 OH Pekerja @ Rp. 70,000.00 Rp. 6,300.00
0.090 OH Tukang @ Rp. Err:509 Rp. Err:509
0.009 OH Kepala Tukang @ Rp. Err:509 Rp. Err:509
0.005 OH Mandor @ Rp. 95,000.00 Rp. 475.00
Jumlah Rp. Err:509

Bahan : 10.600 Bh Plin Keramik (10 x 10) @ Rp. 1,400.00 Rp. 14,840.00
0.003 M3 Pasir Pasang @ Rp. 185,000.00 Rp. 555.00
1.140 Kg Semen Portland @ Rp. 1,650.00 Rp. 1,881.00
0.050 Kg Semen Warna @ Rp. 165,000.00 Rp. 8,250.00
Jumlah Bahan Rp. 25,526.00
Jumlah Upah + Bahan Rp. Err:509
Dibulatkan Rp. Err:509

PEKERJAAN KAYU
SNI.3434-2008-6.1
Membuat Kusen pintu dan kusen jendela ,Kayu Klass I
7.000 OH Pekerja @ Rp. 70,000.00 Rp. 490,000.00
21.000 OH Tukang @ Rp. Err:509 Rp. Err:509
2.100 OH Kepala Tukang @ Rp. Err:509 Rp. Err:509
0.350 OH Mandor @ Rp. 95,000.00 Rp. 33,250.00
1.100 m3 Kayu Balok @ Rp. 6,482,550.00 Rp. 7,130,805.00
1.250 Kg Paku Kayu 10 Cm @ Rp. 15,400.00 Rp. 19,250.00
1.000 Kg Lem Kayu @ Rp. 15,000.00 Rp. 15,000.00
Jumlah Upah + Bahan Rp. Err:509
Dibulatkan Rp. Err:509

SNI.3434-2008-6.2
Membuat Kusen pintu dan kusen jendela ,Kayu Klass II dan Klass III
6.000 OH Pekerja @ Rp. 70,000.00 Rp. 420,000.00
18.000 OH Tukang @ Rp. Err:509 Rp. Err:509
1.800 OH Kepala Tukang @ Rp. Err:509 Rp. Err:509
0.300 OH Mandor @ Rp. 95,000.00 Rp. 28,500.00
1.200 m3 Kayu Balok @ Rp. 5,255,650.00 Rp. 6,306,780.00
1.250 Kg Paku Kayu 10 Cm @ Rp. 15,400.00 Rp. 19,250.00
1.000 Kg Lem Kayu @ Rp. 15,000.00 Rp. 15,000.00
Jumlah Upah + Bahan Rp. Err:509
Dibulatkan Rp. Err:509
SNI.3434-2008-6.5
Membuat Dan Memasang 1 m2 Daun Pintu Panel Klass I Atau Klass II
1.000 OH Pekerja @ Rp. 70,000.00 Rp. 70,000.00
3.000 OH Tukang Kayu @ Rp. Err:509 Rp. Err:509
0.300 OH Kepala Tukang @ Rp. Err:509 Rp. Err:509
0.050 OH Mandor @ Rp. 95,000.00 Rp. 4,750.00
1.200 m3 Papan Kayu @ Rp. 185,000.00 Rp. 222,000.00
1.000 Kg Lem Kayu @ Rp. 15,400.00 Rp. 15,400.00
Jumlah Upah + Bahan Rp. Err:509
Dibulatkan Rp. Err:509
SNI.3434-2008-6.13
1 m3 Pasang Konstruksi kuda-kuda Kayu
1.1000 m3 Kayu Klas I @ Rp. 6,482,550.00 Rp. 7,130,805.00
15.0000 kg Besi plat Strip @ Rp. 16,000.00 Rp. 240,000.00
0.200 OH Pekerja @ Rp. 70,000.00 Rp. 14,000.00
0.100 OH Tukang @ Rp. Err:509 Rp. Err:509
0.010 OH Kepala Tukang @ Rp. Err:509 Rp. Err:509
0.001 OH Mandor @ Rp. 95,000.00 Rp. 95.00
Jumlah Upah + Bahan Rp. Err:509
Dibulatkan Rp. Err:509
SNI.3434-2008-6.6
Membuat dan memasang 1 m2 Pintu dan Jendela Kaca, Kayu Klass I Atau II
0.800 OH Pekerja @ Rp. 70,000.00 Rp. 56,000.00
2.400 OH Tukang @ Rp. Err:509 Rp. Err:509
0.240 OH Kepala Tukang @ Rp. Err:509 Rp. Err:509
0.040 OH Mandor @ Rp. 95,000.00 Rp. 3,800.00
Jumlah Rp. Err:509

0.024 m3 Papan Kayu @ Rp. 5,255,650.00 Rp. 126,135.60


0.300 Kg Lem Kayu @ Rp. 15,000.00 Rp. 4,500.00
Jumlah Bahan Rp. 130,635.60
Jumlah Upah + Bahan Rp. Err:509
Dibulatkan Rp. Err:509
SNI.3434-2008-6.15
1 M3 Memasang Kontruksi Gording, Kayu Kelas II
2.400 OH Pekerja @ Rp. 70,000.00 Rp. 168,000.00
7.200 OH Tukang @ Rp. Err:509 Rp. Err:509
0.720 OH Kepala Tukang @ Rp. Err:509 Rp. Err:509
0.120 OH Mandor @ Rp. 95,000.00 Rp. 11,400.00
Jumlah Rp. Err:509

1.100 m3 Kayu Balok kelas II @ Rp. 5,255,650.00 Rp. 5,781,215.00


15.000 Kg Besi Strip Tebal 5 mm @ Rp. 16,000.00 Rp. 240,000.00
3.000 Kg Paku 12 Cm @ Rp. 15,400.00 46,200.00
Jumlah Bahan Rp. 6,067,415.00
Jumlah Upah + Bahan Rp. Err:509
Dibulatkan Rp. Err:509
SNI.3434-2008-6.19
Memasang 1 m2 Rangka Langit-langit ( 50 x 100) cm, Kayu Klass II dan III
0.150 OH Pekerja @ Rp. 70,000.00 Rp. 10,500.00
0.300 OH Tukang @ Rp. Err:509 Rp. Err:509
0.030 OH Kepala Tukang @ Rp. Err:509 Rp. Err:509
0.005 OH Mandor @ Rp. 95,000.00 Rp. 475.00
Jumlah Rp. Err:509

0.015 m3 Kaso- kaso ( 5 x 7 ) cm @ Rp. 2,500,000.00 Rp. 37,500.00


0.200 Kg Paku Kayu 7 cm - 10 cm @ Rp. 15,400.00 Rp. 3,080.00
Jumlah Bahan Rp. 40,580.00
Jumlah Upah + Bahan Rp. Err:509
Dibulatkan Rp. Err:509
SNI.3434-2008-6.21
1 m1 Memasang Lisplank Uk. (3 x 30 ) cm , Kayu Klass I atau Klass II

0.100 OH Pekerja @ Rp. 70,000.00 Rp. 7,000.00


0.200 OH Tukang @ Rp. Err:509 Rp. Err:509
0.020 OH Kepala Tukang @ Rp. Err:509 Rp. Err:509
0.005 OH Mandor @ Rp. 95,000.00 Rp. 475.00
Jumlah Rp. Err:509

0.011 M3 Papan Kayu @ Rp. 5,255,650.00 Rp. 57,812.15


0.010 Kg Paku 5 cm- 7 cm @ Rp. 15,400.00 Rp. 154.00
Jumlah Bahan Rp. 57,966.15
Jumlah Upah + Bahan Rp. Err:509
Dibulatkan Rp. Err:509
PEKERJAAN ATAP

SNI.3436-2008-6.33
1 m2 Memasang Atap Multiroof
0.120 OH Pekerja @ Rp. 70,000.00 Rp. 8,400.00
0.060 OH Tukang @ Rp. Err:509 Rp. Err:509
0.006 OH Kepala Tukang @ Rp. Err:509 Rp. Err:509
0.006 OH Mandor @ Rp. 95,000.00 Rp. 570.00
1.150 m2 Atap Seng Genteng @ Rp. 95,000.00 Rp. 109,250.00
0.200 Kg Paku Seng @ Rp. 20,000.00 Rp. 4,000.00
Jumlah Upah + Bahan Rp. Err:509
Dibulatkan Rp. Err:509
SNI.3436-2008-6.37
1 m' Memasang Rabung Atap Multiroof
0.200 OH Pekerja @ Rp. 70,000.00 Rp. 14,000.00
0.100 OH Tukang @ Rp. Err:509 Rp. Err:509
0.010 OH Kepala Tukang @ Rp. Err:509 Rp. Err:509
0.001 OH Mandor @ Rp. 95,000.00 Rp. 95.00
0.300 m Rabung Atap Multiroof @ Rp. 85,000.00 Rp. 25,500.00
0.216 Kg Paku Seng @ Rp. 20,000.00 Rp. 4,320.00
Jumlah Upah + Bahan Rp. Err:509
Dibulatkan Rp. Err:509

PEKERJAAN RANGKA PLAFOND DAN PLAFOND

SNI.2839-2008-6.5
Memasang 1 m2 Langit-langit Tripleks tebal 4 mm
0.100 OH Pekerja @ Rp. 70,000.00 Rp. 7,000.00
0.100 OH Tukang @ Rp. Err:509 Rp. Err:509
0.010 OH Kepala Tukang @ Rp. Err:509 Rp. Err:509
0.075 OH Mandor @ Rp. 95,000.00 Rp. 7,125.00
Jumlah Rp. Err:509

0.375 Lbr Tripleks,Tebal = 4 mm @ Rp. 87,000.00 Rp. 32,625.00


0.030 Kg Paku Triplek @ Rp. 15,400.00 Rp. 462.00
Jumlah Bahan Rp. 33,087.00
Jumlah Upah + Bahan Rp. Err:509
Dibulatkan Rp. Err:509
SNI.2839-2008-6.10
1 M1 List Langit-langit Kayu Profil

0.050 OH Pekerja @ Rp. 70,000.00 Rp. 3,500.00


0.050 OH Tukang @ Rp. Err:509 Rp. Err:509
0.005 OH Kepala Tukang @ Rp. Err:509 Rp. Err:509
0.003 OH Mandor @ Rp. 95,000.00 Rp. 285.00
Jumlah Rp. Err:509

1.050 M1 Kayu Profil Plafond/List Profil @ Rp. 8,500.00 Rp. 8,925.00


0.010 Kg Paku Kayu @ Rp. 15,400.00 Rp. 154.00
Jumlah Bahan Rp. 9,079.00
Jumlah Upah + Bahan Rp. Err:509
Dibulatkan Rp. Err:509

PEKERJAAN PENGUNCI DAN PENGGANTUNG

RSNI. T-03-6.4.2008
1 Set Pekerjaan Pemasangan Kunci Pintu Tanam 2 slaag
0.0600 Oh Pekerja @ Rp. 70,000.00 Rp. 4,200.00
0.0150 Oh Tukang Kayu @ Rp. Err:509 Rp. Err:509
0.1500 Oh Kepala Tukang @ Rp. Err:509 Rp. Err:509
0.0007 Oh Mandor @ Rp. 95,000.00 Rp. 66.50
Jumlah Rp. Err:509

1.0000 Set Kunci Pintu Tanam 2 slaag Merk Benotti @ Rp. 185,000.00 Rp. 185,000.00
Jumlah Bahan Rp. 185,000.00
Jumlah Upah + Bahan Rp. Err:509
Dibulatkan Rp. Err:509
RSNI.T- 03-6.5.2008
1 Buah Pasang Kunci Tanam Biasa

0.0100 Oh Pekerja @ Rp. 70,000.00 Rp. 700.00


0.5000 Oh Tukang Kayu @ Rp. Err:509 Rp. Err:509
0.0100 Oh Kepala Tukang @ Rp. Err:509 Rp. Err:509
0.0005 Oh Mandor @ Rp. 95,000.00 Rp. 47.50
Jumlah Rp. Err:509

1.0000 Bh Kunci Tanam Biasa @ Rp. 125,000.00 Rp. 125,000.00


Jumlah Bahan Rp. 125,000.00
Jumlah Upah + Bahan Rp. Err:509
Dibulatkan Rp. Err:509

RSNI.T-30.2000-C- 4
1 Pasang Engel Pintu
0.0150 Oh Pekerja @ Rp. 70,000.00 Rp. 1,050.00
0.1500 Oh Tukang Kayu @ Rp. Err:509 Rp. Err:509
0.0150 Oh Kepala Tukang @ Rp. Err:509 Rp. Err:509
0.0001 Oh Mandor @ Rp. 95,000.00 Rp. 9.50
Jumlah Rp. Err:509

1.0000 Psg Engsel Pintu @ Rp. 17,500.00 Rp. 17,500.00


Jumlah Bahan Rp. 17,500.00
Jumlah Upah + Bahan Rp. Err:509
Dibulatkan Rp. Err:509
RSNI.T-30.2000-C- 5
1 Pasang Engel Jendela dan Ventilasi
0.0100 Oh Pekerja @ Rp. 70,000.00 Rp. 700.00
0.1000 Oh Tukang Kayu @ Rp. Err:509 Rp. Err:509
0.0100 Oh Kepala Tukang @ Rp. Err:509 Rp. Err:509
0.0010 Oh Mandor @ Rp. 95,000.00 Rp. 95.00
Jumlah Rp. Err:509

1.0000 Psg Engsel jendela @ Rp. 14,500.00 Rp. 14,500.00


Jumlah Bahan Rp. 14,500.00
Jumlah Upah + Bahan Rp. Err:509
Dibulatkan Rp. Err:509
RSNI.T-30.2000-C- 17
1 Pasang Engel Jendela dan Ventilasi
0.0150 Oh Pekerja @ Rp. 70,000.00 Rp. 1,050.00
0.1500 Oh Tukang Kayu @ Rp. Err:509 Rp. Err:509
0.0150 Oh Kepala Tukang @ Rp. Err:509 Rp. Err:509
0.0008 Oh Mandor @ Rp. 95,000.00 Rp. 71.25
Jumlah Rp. Err:509

1.1000 m2 Kaca 5 mm @ Rp. 120,000.00 Rp. 132,000.00


Jumlah Bahan Rp. 132,000.00
Jumlah Upah + Bahan Rp. Err:509
Dibulatkan Rp. Err:509
RSNI.T- 03-6.9.2002
1 Pasang Pacok Jendela dan Ventilasi

0.0200 Oh Pekerja @ Rp. 70,000.00 Rp. 1,400.00


0.2000 Oh Tukang Kayu @ Rp. Err:509 Rp. Err:509
0.0200 Oh Kepala Tukang @ Rp. Err:509 Rp. Err:509
0.0010 Oh Mandor @ Rp. 95,000.00 Rp. 95.00
Jumlah Rp. Err:509

1.0000 Psg Pacok Jendela& Ventilasi @ Rp. 5,500.00 Rp. 5,500.00


Jumlah Bahan Rp. 5,500.00
Jumlah Upah + Bahan Rp. Err:509
Dibulatkan Rp. Err:509
RSNI.T- 03-6.10.2002
1 Pasang Hak Angin Jendela dan Hak Angin Ventilasi
0.0150 Oh Pekerja @ Rp. 70,000.00 Rp. 1,050.00
0.0150 Oh Tukang Kayu @ Rp. Err:509 Rp. Err:509
0.00075 Oh Kepala Tukang @ Rp. Err:509 Rp. Err:509
0.1500 Oh Mandor @ Rp. 95,000.00 Rp. 14,250.00
Jumlah Rp. Err:509

1.0000 Psg Hak Angin Jendela & ventilasi @ Rp. 8,500.00 Rp. 8,500.00
Jumlah Bahan Rp. 8,500.00
Jumlah Upah + Bahan Rp. Err:509
Dibulatkan Rp. Err:509
RSNI. T-03-6.11.2002
1 Pasang Pegangan pintu/door holder
0.0500 Oh Pekerja @ Rp. 70,000.00 Rp. 3,500.00
0.5000 Oh Tukang Kayu @ Rp. Err:509 Rp. Err:509
0.0500 Oh Kepala Tukang @ Rp. Err:509 Rp. Err:509
0.0025 Oh Mandor @ Rp. 95,000.00 Rp. 237.50
Jumlah Rp. Err:509

1.0000 Psg Door holder @ Rp. 150,000.00 Rp. 150,000.00


Jumlah Bahan Rp. 150,000.00
Jumlah Upah + Bahan Rp. Err:509
Dibulatkan Rp. Err:509

PEKERJAAN SANITASI
RSNI.T-15-2-2002
Memasang Kloset Jongkok Setara KIA

3.3000 OH Pekerja @ Rp. 70,000.00 Rp. 231,000.00


1.1000 OH Tukang Batu @ Rp. Err:509 Rp. Err:509
0.0010 OH Kepala Tukang @ Rp. Err:509 Rp. Err:509
0.1600 OH Mandor @ Rp. 95,000.00 Rp. 15,200.00
Jumlah Rp. Err:509

1.0000 Bh Kloset Jongkok Setara KIA @ Rp. 394,500.00 Rp. 394,500.00


0.3000 Ls Perlengkapan(30 % harga Kloset) @ Rp. 118,350.00 Rp. 35,505.00
6.0000 Kg Semen PC @ Rp. 1,650.00 Rp. 9,900.00
0.0100 m3 Pasir Pasang @ Rp. 185,000.00 Rp. 1,850.00
Jumlah Bahan Rp. 441,755.00
Jumlah Upah + Bahan Rp. Err:509
Dibulatkan Rp. Err:509
RSNI.T-15-2.f-2002
1 Bh Pasang Kran Air 3/4 "

0.0100 OH Pekerja @ Rp. 70,000.00 Rp. 700.00


0.1000 OH Tukang Batu @ Rp. Err:509 Rp. Err:509
0.0100 OH Kepala Tukang @ Rp. Err:509 Rp. Err:509
0.0500 OH Mandor @ Rp. 95,000.00 Rp. 4,750.00
Jumlah Rp. Err:509

1.0000 Bh Kran Janito Toto 3/4" @ Rp. 65,000.00 Rp. 65,000.00


0.2500 Bh Seal Tape @ Rp. 4,000.00 Rp. 1,000.00
Jumlah Bahan Rp. 66,000.00
Jumlah Upah + Bahan Rp. Err:509
Dibulatkan Rp. Err:509
RSNI.T-15-2.g.2002
1 Bh Pasang Floor Drain Stainless Steel 4"

0.0100 OH Pekerja @ Rp. 70,000.00 Rp. 700.00


0.1000 OH Tukang Batu @ Rp. Err:509 Rp. Err:509
0.0100 OH Kepala Tukang @ Rp. Err:509 Rp. Err:509
0.0500 OH Mandor @ Rp. 95,000.00 Rp. 4,750.00
Jumlah Rp. Err:509

1.0000 Bh Floor Drain @ Rp. 45,000.00 Rp. 45,000.00


Jumlah Bahan Rp. 45,000.00
Jumlah Upah + Bahan Rp. Err:509
Dibulatkan Rp. Err:509
PEKERJAAN PENGECATAN
PT. T-38-2008-C-B8
1 m2 Pengecatan Bidang Kayu
0.070 OH Pekerja @ Rp. 70,000.00 Rp. 4,900.00
0.009 OH Tukang @ Rp. Err:509 Rp. Err:509
0.006 OH Kepala Tukang @ Rp. Err:509 Rp. Err:509
0.0025 OH Mandor @ Rp. 95,000.00 Rp. 237.50
0.200 Kg Cat Meni @ Rp. 33,000.00 Rp. 6,600.00
0.150 Kg Plamir @ Rp. 15,290.00 Rp. 2,293.50
0.170 Kg Cat Dasar @ Rp. 25,000.00 Rp. 4,250.00
0.260 Kg Cat Kayu @ Rp. 82,500.00 Rp. 21,450.00
Jumlah Upah + Bahan Rp. Err:509
Dibulatkan Rp. Err:509

PT. T-38-2008-C-B14
1 m2 Pengecatan Tembok Baru

0.020 OH Pekerja @ Rp. 70,000.00 Rp. 1,400.00


0.063 OH Tukang @ Rp. Err:509 Rp. Err:509
0.0063 OH Kepala Tukang @ Rp. Err:509 Rp. Err:509
0.0025 OH Mandor @ Rp. 95,000.00 Rp. 237.50
0.100 Kg Plamir @ Rp. 15,290.00 Rp. 1,529.00
0.100 Kg Cat Dasar (sealer) @ Rp. 25,000.00 Rp. 2,500.00
0.260 Kg Cat Tembok (WeatherShield) @ Rp. 33,000.00 Rp. 8,580.00
Jumlah Upah + Bahan Rp. Err:509
Dibulatkan Rp. Err:509
BACK UP DATA PEKERJAAN LANTAI. I
Pekerjaan : KONSTRUKSI FISIK PEMBANGUNAN PERTOKOAN TRINGGADENG 2 LANTAI
Lokasi : TRIENGGADENG - KAB. PIDIE JAYA
Prop / Kab / Kodya : DINAS PERINDUSTRIAN DAN PERDAGANGAN ACEH
Tahun Anggaran : 2018

Uraian Pekerjaan Hitungan Volume

1 2
LANTAI - I
PEKERJAAN GALIAN TANAH DAN PONDASI Galian Tanah Pondasi Tapak
TP-1
Panjang = 1.200 m'
Lebar = 1.200 m'
Tinggi = 1.350 m'
Jumlah = 25.00 bh
Volume = Panjang x Lebar x Tinggi x Jumlah
= 1.200 x 1.200 x 1.350 x 25.00
= 48.600 m3

Volume Total = TP-1 + #REF!


= 48.600 + #REF!
= #REF! m3

Galian Tanah Pondasi Menerus


Panjang = 162.000 m'
Lebar = 0.900 m'
Tinggi = 0.250 m'
Volume = Panjang x Lebar x Tinggi
= 162.000 x 0.900 x 0.250
= 36.450 m3

Galian Tanah Pondasi Menerus Selasar


Panjang = - m'
Lebar = 0.900 m'
Tinggi = 0.250 m'
Volume = Panjang x Lebar x Tinggi
= - x 0.900 x 0.250
= - m3

Volume Total = Galian Tanah Po + Galian Tanah Pondasi Menerus Selasar


= 36.450 + -
= 36.450 m3

Err:509

Panjang = 23.240 m'


Lebar = 0.460 m'
Tinggi = 0.350 m'
Volume = Panjang x Lebar x Tinggi
= 23.240 x 0.460 x 0.350
= 3.742 m3

Err:509
Volume = 1/3 x Galian
Volume = 0.333 x 48.600
= 16.200 m3

Urungan Kembali Galian Tanah Pondasi Tapak - TP1


Volume = 1/3 x Galian
Volume = 0.333 x #REF!
= #REF! m3

Urungan Kembali Galian Tanah Pondasi Menerus


Volume = 1/3 x Galian
Volume = 0.333 x 36.450
= 12.150 m3

Urungan Kembali Galian Tanah Pondasi Trap Tangga


Volume = 1/3 x Galian
Volume = 0.333 x 3.742
= 1.247 m3
Err:509
TP-1
Panjang = 1.200 m'
Lebar = 1.200 m'
Tinggi = 0.050 m'
Jumlah = 25.000 bh
Volume = Panjang x Lebar x Tinggi x Jumlah
= 1.200 x 1.200 x 0.050 x 25.00
= 1.800 m3

TP-2
Panjang = #REF! m'
Lebar = #REF! m'
Tinggi = 0.050 m'
Jumlah = 10.00 bh
Volume = Panjang x Lebar x Tinggi x Jumlah
= #REF! x #REF! x 0.050 x 10.00
= #REF! m3

Volume Total = TP-1 + TP-2


= 1.800 + #REF!
= #REF! m3

Urungan Pasir Alas Pondasi Menerus t = 5 cm


Panjang = 192.000 m'
Lebar = 0.900 m'
Tinggi = 0.050 m'
Volume = Panjang x Lebar x Tinggi
= 192.000 x 0.900 x 0.050
= 8.640 m3

Urungan Pasir Alas Pondasi Trap Tangga t = 5 cm

Panjang = 23.240 m'


Lebar = 0.460 m'
Tinggi = 0.050 m'
Volume = Panjang x Lebar x Tinggi
= 23.240 x 0.460 x 0.050
= 0.535 m3

Err:509
Panjang = 7.000 m'
Lebar = 0.300 m'
Tinggi = 0.050 m'
Volume = Panjang x Lebar x Tinggi
= 7.000 x 0.300 x 0.050
= 0.105 m3

Err:509

Panjang = 28.000 m'


Lebar = 0.500 m'
Tinggi = 0.100 m'
Volume = 28.000 x 0.500 x 0.100
= 1.400 m3

Err:509
-
Panjang = 23.240 m'
Lebar = 0.460 m'
Tinggi = 0.150 m'
Volume = 23.240 x 0.460 x 0.150
= 1.604 m3

Pas. Batu Kosong /Aanstamping Pondasi Tapak t = 10 cm


TP-1
Panjang = 1.200 m'
Lebar = 1.200 m'
Tinggi = 0.100 m'
Jml = 25.000 bh
Volume = 1.200 x 1.200 x 0.100 x 25.000
= 3.600 m3

TP-2
Panjang = #REF! m'
Lebar = #REF! m'
Tinggi = 0.100 m'
Jml = 10.000 bh
Volume = #REF! x #REF! x 0.100 x 10.000
= #REF! m'

Volume Total = TP-1 + TP-2


= 3.600 + #REF!
= #REF! m3
Pondasi Tapak 120 x 120 cm (TP1)
Panjang = 1.000 m'
Lebar = 1.000 m'
Tebal = 0.250 m'
Jumlah = 25.000 bh
Volume = 1.000 x 1.000 x 0.250 x 25.000
= 6.250 m3

Err:509
Panjang = 1.300 m'
Lebar = 1.400 m'
Tinggi = 0.250 m'
Jumlah = 10.000 bh
Volume = 1.300 x 1.400 x 0.250 x 10.000
= 4.550 m3

Pas. Batu Kosong /Aanstamping Pondasi Menerus t = 10 cm


Ruangan
Panjang = 192.000 m'
Lebar = 0.800 m'
Tinggi = 0.100 m'
Volume = Panjang x Lebar x Tinggi
= 192.000 x 0.800 x 0.100
= 15.360 m3

Pas. Batu Kali 1 : 4


Ruangan
Panjang = 192.000 m'
Lebar Atas = 0.250 m'
Lebar Bawah = 0.500 m'
Tinggi = 0.600 m'
Volume = Lebar Atas + Lebar Bawahx Panjang x Tinggi
= 2.000 x 192.000 x 0.600
= 0.375 x 192.000 x 0.600
= 43.200 m3

Pas. Pondasi Rolaag 1 : 2 Trap Tangga


Tangga 1
Trap 1-1
Panjang = 23.240 m'
Tinggi = 0.3 m'
Volume = Panjang x Tinggi = 23.24 x 0.3
= 6.972 m2

Err:509
Luas = 264.560 m2
Tinggi = 1.2 m'
Volume = Luas x Tinggi = 264.56 x 1.2
= 317.472 m3

PEKERJAAN BETON BERTULANG Kolom Pedestal 25/35 - K1


Panjang = 0.3 m'
Lebar = 0.3 m'
Tinggi = 2 m'
Jumlah = 25.000 bh
Volume = Panjang x Lebar x Tinggi x Jumlah
= 0.30 x 0.300 x 2.00 x 25.00
4.5 m3

Err:509
Panjang = 0.15 m'
Lebar = 0.3 m'
Tinggi = 2 m'
Jumlah = 20.000 bh
Volume = Panjang x Lebar x Tinggi x Jumlah
= 0.15 x 0.300 x 2.00 x 20.00
1.8 m3

Sloof 25/35 - SL1


Panjang = 220.000 m'
Lebar = 0.250 m'
Tinggi = 0.400 m'
Volume = 220.000 x 0.250 x 0.400
= 22.000 m3

Kolom 25/35 - K1
Panjang = 0.300 m'
Lebar = 0.300 m'
Tinggi = 3.900 m'
Jumlah = 25.000 bh
Volume = 0.300 x 0.300 x 3.900 x 25.000
= 8.775 m3

Err:509
Panjang = 0.150 m'
Lebar = 0.300 m'
Tinggi = 3.900 m'
Jumlah = 20.000 bh
Volume = 0.300 x 0.300 x 3.900 x 20.000
= 7.020 m3
Balok Latai 13/15 - BLT1
Panjang = 28.000 m'
Lebar = 0.130 m'
Tinggi = 0.200 m'
Volume = 28.000 x 0.130 x 0.200
= 0.728 m3

Balok Lantai 25/35 - B1


Panjang = 220.000 m'
Lebar = 0.250 m'
Tinggi = 0.350 m'
Volume = 220.000 x 0.250 x 0.350
= 19.250 m3

Balok Lantai 18/20- B2


Panjang = 49.600 m'
Lebar = 0.180 m'
Tinggi = 0.250 m'
Volume = 49.600 x 0.180 x 0.250
= 2.232 m3

Err:509
Panjang = 32.000 m'
Lebar = 0.200 m'
Tinggi = 0.300 m'
Volume = 32.000 x 0.200 x 0.300
= 1.920 m3

Plat Lantai t = 12 cm
Luas = 203.822 m2
Tinggi = 0.120 m'
Volume = Luas x Tinggi
= 203.822 x 0.120
= 24.459 m3

Err:509
Tangga
Panjang = 0.500 m'
Lebar = 1.000 m'
Jml Bid. = 20.000 bh
Tinggi = 0.120 m'
Volume = Panjang x Lebar x Jml Bid. x Tinggi
= 0.500 x 1.000 x 20.000 x 0.120
= 1.200 m3

Bordes
Panjang = 1.000 m'
Lebar = 1.000 m'
Jml Bid. = 16.000 bh
Tinggi = 0.120 m'
Volume = Panjang x Lebar x Jml Bid. x Tinggi
= 1.000 x 1.000 x 16.000 x 0.120
= 1.920 m3

Volume Total = Tangga + Bordes


= 1.20 + 1.920
= 3.120 m3

PEKERJAAN PASANGAN DAN PLESTERAN Pas. Bata Tebal 1/2 Camp. 1 : 2


Panjang = 94.000 m'
Tinggi = 0.400 m'
Volume = 94.000 x 0.400
= 37.600 m2

Pas. Bata Tebal 1/2 Camp. 1 : 4


Panjang = 129.600 m'
Tinggi = 3.900 m'
Pengurangan = - m2
Volume = 129.600 x 3.900 - -
= 505.440 m2

Plesteran Dinding 1 : 2
Luas = 37.600 m2
Bidang = 2.000 bh
Volume = 37.600 x 2.000
= 75.200 m2

Plesteran Dinding 1 : 4
Luas = 505.440 m2
Bidang = 2.000 bh
Volume = 505.440 x 2.000
= 1,010.880 m2

Acian Beton Bertulang


Kolom 25/35 - K1 = 0.180 x 3.900 x 25.000 = 17.550
Err:509 = 0.090 x 3.900 x 20.000 = 7.020
Balok Lantai 25/35 - = 0.950 x 220.000 x 1.000 = 209.000
Err:509 = 0.800 x 32.000 x 1.000 = 25.600
Volume 259.170
PEKERJAAN LANTAI DAN DINDING Urungan Tanah Bawah Lantai Ruangan
Luas Ruangan = 202.064 m2
Tinggi = 1.000 m'
Volume = 202.064 x 1.000
= 202.064 m3

Urungan Tanah Bawah Selasar


Selasar
Luas Ruangan = 33.600 m2
Tinggi = 0.950 m'
Volume = 33.600 x 0.950
= 31.920 m3

Urungan Pasir Bawah Lantai


Luas Ruangan = 235.664 m2
Tinggi = 0.100 m'
Volume = 235.664 x 0.100
= 23.566 m3

Rabat Beton Bawah Lantai


Luas Ruangan = 235.664 m2
Tinggi = 0.050 m'
Volume = 235.664 x 0.050
= 11.783 m3

Lantai Keramik Ruangan 40 x 40 Cm Polished


Luas Ruangan = 202.064 m2
Bidang = 1.000 bh
Luas = 202.064 x 1.000
= 202.064 m2

Lantai Keramik Selasar 40 x 40 Cm Unpolished


Luas Ruangan = 33.600 m2
Bidang = 1.000 bh
Luas = 33.600 x 1.000
= 33.600 m2

Lantai Keramik Tangga Selasar 40 x 40 Cm Unpolihed


Injakan
Luas Ruangan = 0.840 m2
Bidang = 8.000 bh
Luas = 0.840 x 8.000
= 6.720 m2

Tanjakan
Luas Ruangan = 0.560 m2
Luas Ruangan = 8.000 m2
Luas = 0.560 x 8.000
= 4.480 m2

Volume Total = 6.720 + 4.480


= 11.200 m2

PEKERJAAN ATAP Err:509


Luas Bidang = 170.222 m2
= 170.222 m2

Pasang Kanopy Hollow Selasar + Atap Spandek 0,3(Bentuk dan Ukuran sesuai Gambar)
a Luas Bidang = 5.115 m2
Jumlah Bidang = 6.000 bh
Luas = 5.115 x 6.000
= 30.690 m2

b Luas Bidang = 8.580 m2


Jumlah Bidang = 2.000 bh
Luas = 8.580 x 2.000
= 17.160 m2

Volume Total = 30.690 + 17.160


= 47.850 m2

PEKERJAAN PENGECATAN Pengecatan Dinding dan Beton Bertulang 3 x (L/D)


Luas Bid.Dinding = 1086.08 m2
Luas Bid.Acian = 24.57 m2
Volume = Luas Bid.Dinding + Luas Bid.Acian
= 1,086.080 + 24.570
= 1,110.650 m2
Err:509 Err:509
Samping Panjang = 56.00 m'
Lebar = 0.40 m'
Tinggi = 0.40 m'
Volume = Panjang x Lebar x Tinggi
= 56.000 x 0.400 x 0.40
= 8.960 m3

Depan Panjang = 19.00 m'


Lebar = 0.80 m'
Tinggi = 0.80 m'
Volume = Panjang x Lebar x Tinggi
= 19.000 x 0.800 x 0.80
= 12.160 m3

Volume Total = Samping + Depan


= 8.960 + 12.160
= 21.120 m3

Err:509
Samping Panjang = 56.00 m'
Lebar = 0.40 m'
Tinggi = 0.05 m'
Volume = Panjang x Lebar x Tinggi
= 56.000 x 0.400 x 0.05
= 1.120 m3

Depan Panjang = 19.00 m'


Lebar = 0.80 m'
Tinggi = 0.05 m'
Volume = Panjang x Lebar x Tinggi
= 19.000 x 0.800 x 0.05
= 0.760 m3

Volume Total = Samping + Depan


= 1.120 + 0.760
= 1.880 m3

Err:509
Samping Panjang = 56.00 m'
Lebar = 0.40 m'
Tinggi = 0.10 m'
Volume = Panjang x Lebar x Tinggi
= 56.000 x 0.400 x 0.10
= 2.240 m3

Depan Panjang = 19.00 m'


Lebar = 0.80 m'
Tinggi = 0.10 m'
Volume = Panjang x Lebar x Tinggi
= 19.000 x 0.800 x 0.10
= 1.520 m3

Volume Total = Samping + Depan


= 2.240 + 1.520
= 3.760 m3

Err:509
Samping Panjang = 112.00 m'
Tinggi = 0.30 m'
Volume = Panjang x Tinggi
= 112.000 x 0.300
= 33.600 m2

Err:509
Dinding Panjang = 19.00 m'
Lebar a = 0.15 m'
Lebar b = 0.20 m'
Tinggi = 0.40 m'
Volume = Lebar a + Lebar b x Panjang x Tinggi
2.000
= 0.150 + 0.200 x 19.00 x 0.40
2.000
= 1.330 x 2.000 sisi
= 2.660 m3

Alas Panjang = 19.00 m'


Lebar = 0.80 m'
Tinggi = 0.25 m'

Volume = Panjang x Lebar x Tinggi


= 19.000 x 0.800 x 0.25
= 3.800 m3

Volume Total = Dinding + Alas


= 2.660 + 3.800
= 6.460 m3
Err:509
Dinding
Panjang = 150.00 m'
Tinggi = 0.40 m'
Volume = Panjang x Tinggi
= 150.000 x 0.400
= 60.000 m2

Bid. Atas
Panjang = 188.00 m'
Tinggi = 0.15 m'
Volume = Panjang x Tinggi
= 188.000 x 0.150
= 28.200 m2

Volume Total = Dinding + Bid. Atas


= 60.000 + 28.200
= 88.200 m2

Err:509
Panjang = 56.00 m'
Lebar = 0.40 m'
Volume = Panjang x Lebar
= 56.000 x 0.400
= 22.400 m2

Err:509
Baru Panjang = 19.00 m'
Lebar = 0.80 m'
Tinggi = 0.15 m'
Volume = Panjang x Lebar x Tinggi
= 19.000 x 0.800 x 0.15
= 2.280 m3

Existing Panjang = 19.00 m'


Lebar = 0.80 m'
Tinggi = 0.15 m'
Volume = Panjang x Lebar x Tinggi
= 19.000 x 0.800 x 0.15
= 2.280 m3

Volume Total = Baru + Existing


= 2.280 + 2.280
= 4.560 m3

PEKERJAAN LANTAI II
PEKERJAAN BETON BERTULANG Kolom 25/35 - K1
Panjang = 0.3 m'
Lebar = 0.3 m'
Tinggi = 3.25 m'
Jumlah = 25.000 bh
Volume = Panjang x Lebar x Tinggi x Jumlah
= 0.30 x 0.300 x 3.25 x 25.00
7.3125 m3

Err:509
Panjang = 0.15 m'
Lebar = 0.3 m'
Tinggi = 3.35 m'
Jumlah = 20.000 bh
Volume = Panjang x Lebar x Tinggi x Jumlah
= 0.15 x 0.300 x 3.35 x 20.00
3.015 m3

Err:509
Panjang = 0.15 m'
Lebar = 0.3 m'
Tinggi = 1.2 m'
Jumlah = 40.000 bh
Volume = Panjang x Lebar x Tinggi x Jumlah
= 0.15 x 0.300 x 1.20 x 40.00
2.16 m3

Err:509
Type 1
Panjang = 0.13 m'
Lebar = 0.13 m'
Tinggi = 3.25 m'
Jumlah = 24.000 bh
Volume = Panjang x Lebar x Tinggi x Jumlah
= 0.13 x 0.130 x 3.25 x 24.00
1.3182 m3
Err:509
Panjang = 0.13 m'
Lebar = 0.13 m'
Tinggi = 0.85 m'
Jumlah = 20.000 bh
Volume = Panjang x Lebar x Tinggi x Jumlah
= 0.13 x 0.130 x 0.85 x 20.00
0.2873 m3

Err:509
Panjang = 0.2 m'
Lebar = 0.2 m'
Tinggi = 0.75 m'
Jumlah = - bh
Volume = Panjang x Lebar x Tinggi x Jumlah
= 0.20 x 0.200 x 0.75 x -
= 0 m3

Pada Top Gevel


Panjang = 0 m'
Lebar = 0.2 m'
Tinggi = 0.2 m'
Volume = Panjang x Lebar x Tinggi
= - x 0.200 x 0.20
= 0 m3

Volume Total = Err:509 + Pada Top Gevel


= - + -
= - m3

Balok Latai 13/15 - BLT1


Panjang = 28.000 m'
Lebar = 0.130 m'
Tinggi = 0.200 m'
Volume = 28.000 x 0.130 x 0.200
= 0.728 m3

Err:509
Panjang = 177.600 m'
Lebar = 0.130 m'
Tinggi = 0.200 m'
Volume = 177.600 x 0.130 x 0.200
= 4.618 m3

Err:509
Panjang = 126.000 m'
Lebar = 0.200 m'
Tinggi = 0.250 m'
Volume = 126.000 x 0.200 x 0.250
= 6.300 m3

Err:509
Panjang = 19.200 m'
Lebar = 0.150 m'
Tinggi = 0.300 m'
Volume = 19.200 x 0.150 x 0.300
= 0.864 m3

Plat Daag t = 10 cm
Panjang = 28.000 m'
Lebar = 1.200 m'
Tebal = 0.100 m'
Volume = 28.000 x 1.200 x 0.100
= 3.360 m3

Plat Kanopy t = 7 cm
Panjang = 58.080 m'
Lebar = 0.500 m'
Tebal = 0.070 m'
Volume = 58.080 x 0.500 x 0.070
= 2.033 m3
PEKERJAAN PASANGAN DAN PLESTERAN Pas. Bata Tebal 1/2 Camp. 1 : 2
Panjang = 32.000 m'
Tinggi = 2.000 m'
Pengurangan = 11.200 m'
Volume = 32.000 x 2.000 - 11.200
= 52.800 m2

Pas. Bata Tebal 1/2 Camp. 1 : 4


Dinding Panjang = 154.000 m'
Tinggi = 3.250 m'
Pengurangan = 29.440 m2
Volume = 154.000 x 3.250 - 29.440
= 471.060 m2

Km/ Wc Panjang = 32.000 m'


Tinggi = 1.250 m'
Pengurangan = 1.920 m2
Volume = 32.000 x 1.250 - 1.920
= 38.080 m2

Balkon Panjang = 16.000 m'


Tinggi = 1.650 m'
Pengurangan = 0.330 m2
Volume = 16.000 x 1.650 - 0.330
= 26.070 m2

Volume Total = Dinding + Km/ Wc + Balkon


= 471.060 + 38.080 + 26.070
= 535.210 m2

Err:509
Panjang = 64.800 m'
Tinggi = 1.050 m'
Volume = 64.800 x 1.050
= 68.040 m2

Plesteran Dinding 1 : 2
Luas = 52.800 m2
Bidang = 1.000 sisi
Volume = 52.800 x 1.000
= 52.800 m2

Plesteran Dinding 1 : 4
Luas = 603.250 m2
Bidang = 2.000 sisi
Volume = 603.250 x 2.000
= 1,206.500 m2

Acian Beton Bertulang


Kolom 25/35 - K1 = 1.200 x 3.250 x 25.000 = 97.500
Err:509 = 0.900 x 3.350 x 20.000 = 60.300
Err:509 = 3.000 x 0.150 x 40.000 = 18.000
Err:509 = 0.900 x 19.200 x - = 17.280
Volume 193.080

PEKERJAAN LANTAI DAN DINDING Lantai Keramik Ruangan 40 x 40 Cm Polished


Luas Ruangan = 170.222 m2
Void dan Tangga = - m'
Volume = 170.222 - -
= 170.222 m2

Err:509
Luas Ruangan = 1.800 m2
Bidang = 8.000 bh
Volume = 1.800 x 8.000
= 14.400 m2

Acian Lantai II
Panjang = 32.000 m'
Tinggi = 2.000 m'
Volume = 32.000 x 2.000 - 11.200
= 52.800 m2

Err:509 Err:509
Luas Bidang = 207.20 m2
Void = 0.00 m2
Luas = 207.200 - -
= 207.200 m2
PEKERJAAN PENGECATAN Pengecatan Dinding dan Beton Bertulang 3 x (L/D)
Luas Bid.Dinding = 1259.30 m2
Luas Bid.Acian = 193.08 m2
Volume = Luas Bid.Dinding + Luas Bid.Acian
= 1,259.300 + 193.080
= 1,452.380 m2

Cat List Plank


Panjang = 48.00 m'
Lebar = 0.25 m'
Volume = Panjang x Lebar sisi
= 48.000 x 0.250 x 2
= 24.000 m2
BACK UP DATA PEKERJAAN LANTAI. II
Pekerjaan : KONSTRUKSI FISIK PEMBANGUNAN PERTOKOAN TRINGGADENG 2 LANTAI
Lokasi : TRIENGGADENG - KAB. PIDIE JAYA
Prop / Kab / Kodya : DINAS PERINDUSTRIAN DAN PERDAGANGAN ACEH
Tahun Anggaran : 2018

Uraian Pekerjaan Hitungan Volume

1 2
PEKERJAAN BETON BERTULANG Kolom 25/35 - K1

Panjang = 0.350 m'


Lebar = 0.350 m'
Tinggi = 3.000 m'

Volume = 0.350 x 0.350 x 3.000 x 19


= 6.983 m3

Balok Latai 13/15 - BLT1

Panjang = 0.130 m'


Lebar = 0.130 m'
Tinggi = 3.000 m'
Volume = 0.130 x 0.130 x 3.000 x 2
= 0.101

tambahan tombak layar 0.130 x 0.130 x 1.250 x 5


Volume 0.231

Volume Total = 0.333 m3

Err:509

Panjang = 84.500 m'


Lebar = 0.200 m'
Tinggi = 0.350 m'
Volume = 84.500 x 0.200 x 0.350
= 5.915 m3

PEKERJAAN PASANGAN DAN PLESTERAN Pas. Bata Tebal 1/2 Camp. 1 : 2

Luas Dinding

Dinding Bangunan
Panjang = 45.000 m'
Tinggi = 3.000 m'
Luas = 45.000 x 3.000
= 135.000 m2

Dinding tambahan pada tombak layar


Panjang = 24.000 m'
Tinggi = 1.250 m'
Luas = 24.000 x 1.250
= 30.000 m2

Kusen J1
Panjang = 0.400 m'
Tinggi = 1.800 m'
Luas = 0.400 x 1.800 x 9
= 6.480 m2

Total Luas dinding

= 135.000 + 30.000 - 6.480


= 158.520 m2
JADWAL WAKTU PELAKSANAAN ( KURVA S)
PEKERJAAN KONSTRUKSI FISIK PEMBANGUNAN PERTOKOAN TRINGGADENG 2 LANTAI
LOKASI TRIENGGADENG - KAB. PIDIE JAYA
SKPA DINAS PERINDUSTRIAN DAN PERDAGANGAN ACEH
TAHUN ANGGARAN 2018
Chart Title
JADWAL WAKTU PELAKSANAAN (180 HARI = 26 MINGGU)
NO. URAIAN PEKERJAAN BOBOT (%) BULAN KE I BULAN KE II BULAN KE III BULAN KE IV BULAN KE V BULAN KE VI BULAN KE VII
1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2
PERLUASAN GEDUNG KANTOR
A PEKERJAAN PERSIAPAN Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
B PEKERJAAN TANAH Err:509 Err:509 Err:509 Err:509
C PEKERJAAN PONDASI DAN BETON Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
D PEKERJAAN PASANGAN DAN PLESTERAN Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
E PEKERJAAN PINTU, JENDELA DAN VENTILASI Err:509 Err:509 Err:509 Err:509 Err:509
F PEKERJAAN LANTAI Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
G PEKERJAAN ATAP Err:509
H PEKERJAAN PLAFOND Err:509 Err:509 Err:509 Err:509
I PEKERJAAN PENGECATAN Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
J PEKERJAAN ELEKTRIKAL Err:509 Err:509 Err:509
K PEKERJAAN SANITASI Err:509 Err:509 Err:509
PEMBANGUNAN MUSALLA
A PEKERJAAN TANAH Err:509 Err:509 Err:509
B PEKERJAAN PONDASI DAN BETON Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
C PEKERJAAN PASANGAN DAN PLESTERAN Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
D PEKERJAAN PINTU, JENDELA DAN VENTILASI Err:509 Err:509 Err:509 Err:509
E PEKERJAAN LANTAI Err:509 Err:509 Err:509 Err:509
F PEKERJAAN ATAP Err:509 Err:509 Err:509 Err:509
G PEKERJAAN PLAFOND Err:509
H PEKERJAAN PENGECATAN Err:509 Err:509 Err:509 Err:509 Err:509
I PEKERJAAN ELEKTRIKAL Err:509 Err:509 Err:509
J PEKERJAAN LAIN-LAIN Err:509 Err:509 Err:509 Err:509 Err:509
BOBOT PEKERJAAN MINGGUAN (%) Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
BOBOT PEKERJAAN KUMULATIF (%) 0.00 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

###
Rp -
###

Rp -
Rp -
JADWAL PENGGUNAAN BAHAN
PEKERJAAN KONSTRUKSI FISIK PEMBANGUNAN PERTOKOAN TRINGGADENG 2 LANTAI
LOKASI TRIENGGADENG - KAB. PIDIE JAYA
SKPA DINAS PERINDUSTRIAN DAN PERDAGANGAN ACEH
TAHUN ANGGARAN 2018

JADWAL PENGGUNAAN BAHAN


NO. URAIAN PEKERJAAN BULAN KE I BULAN KE II BULAN KE III BULAN KE IV BULAN KE V BULAN KE VI BULAN KE VII
1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2
PERLUASAN GEDUNG KANTOR
A PEKERJAAN PERSIAPAN
1 Err:509
2 Pengukuran dan Pembuatan Bouwplank
Jenis Bahan :
Kayu
Paku
Papan Kayu
3 Direksi Keet
Jenis Bahan :
Kayu
Paku
Triplek
Semen
Pasir Beton
4 Pembuatan Papan Nama Proyek
Jenis Bahan :
Kayu
Paku
Cat Minyak
5 Dokumentasi dan Pelaporan
6 Keselamatan Kerja (K3)

B PEKERJAAN TANAH
1 Galian Tanah Pondasi Tapak
2 Galian Tanah Pondasi Menerus
3 Urugan Tanah Kembali
4 Urugan Pasir Bawah Pondasi t= 10 cm
Jenis Bahan :
Pasir Urug
JADWAL PENGGUNAAN BAHAN
NO. URAIAN PEKERJAAN BULAN KE I BULAN KE II BULAN KE III BULAN KE IV BULAN KE V BULAN KE VI BULAN KE VII
1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2
C PEKERJAAN PONDASI DAN BETON
1 Aanstamping pada Pondasi Tapak
Jenis Bahan :
Batu gunung/kali
Pasir Urug
2 Pasangan Batu Pondasi Menerus 1:2
Jenis Bahan :
Batu belah 15cm/20cm
Pasir pasang
Semen Portland
3 Lantai Kerja T = 5 Cm K-100
Jenis Bahan :
Kerikil beton
Pasir beton
Semen Portland
Air
5 Pondasi Tapak (80/80)
6 Sloof Beton Bertulang (25/40)
7 Sloof Beton Bertulang (20/30)
8 Balok Beton Bertulang (25/30)
12 Kolom (40 x 40)
13 Kolom Praktis (13/13)
16 Plat Lantai t=12 cm
Jenis Bahan :
Kerikil beton
Pasir beton
Semen Portland
Air
Besi betn
Kayu Kelas III
Paku 5 cm - 10 cm
Minyak bekisting
Balok Kayu Kelas II
Plywood tebal 9 mm
Dolken Kayu ø 8 -10/400 cm

D PEKERJAAN PASANGAN DAN PLESTERAN


1 Pasangan Dinding bata 1 : 4
2 Plesteran Dinding 1 : 4
3 Pasangan Dinding bata 1 : 2
JADWAL PENGGUNAAN BAHAN
NO. URAIAN PEKERJAAN BULAN KE I BULAN KE II BULAN KE III BULAN KE IV BULAN KE V BULAN KE VI BULAN KE VII
1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2
4 Plesteran Dinding 1 : 2
Jenis Bahan :
Pasir pasang
Bata merah
Semen Portland

E PEKERJAAN PINTU, JENDELA DAN VENTILASI


1 Dinding Partisi Aluminium
2 Kusen Pintu dan Ventilasi Alumunium
3 Pintu Tipe P1
5 Pintu Tipe P3 KM/WC
6 Kunci pintu P1
9 Pengunci Pintu + Aksesoris
10 Engsel Pintu
Jenis Bahan :
Kusen /Profil Almunium
Kaca
Kunci
Ensel

F PEKERJAAN LANTAI
1 Timbunan Tanah bawah Lantai
Jenis Bahan :
Tanah timbun
2 Urugan Pasir Bawah Lantai
Jenis Bahan :
Pasir Urug
3 Beton Cor 1:3:5
Jenis Bahan :
Kerikil beton
Pasir beton
Semen Portland
Air
5 Lantai Keramik 40 x 40 Cm
6 Lantai Keramik 20 x 20 Cm KM/WC
7 Pasangan dinding keramik 20 x 25 cm
Jenis Bahan :
Keramik
Pasir pasang
Semen Portland
JADWAL PENGGUNAAN BAHAN
NO. URAIAN PEKERJAAN BULAN KE I BULAN KE II BULAN KE III BULAN KE IV BULAN KE V BULAN KE VI BULAN KE VII
1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2

H PEKERJAAN PLAFOND
1 Rangka Plafond ( Furing )
2 Plafond Gypsum Board 8 mm
3 List Plafond
Jenis Bahan :
Gipsum Board
Furing
List Gipsum

I PEKERJAAN PENGECATAN
1 Cat Dinding Tembok
2 Cat Kusen, Pintu, dan Ventilasi
Jenis Bahan :
CatT embok
Cat Minyak
Minyak Cat

J PEKERJAAN ELEKTRIKAL
3 Instalasi titik lampu + Kabel NYA 2,5
4 Lampu Hemat Energi
6 Out Fitting Lamp ( Fitting + Lampu Hemat Energy 18 Watt )
7 Stop Kontak 3 Phase Lengkap Kelas 1
8 Stop Kontak 1 Phase Lengkap Kelas 1
9 Saklar Ganda Lengkap Kelas 1

K PEKERJAAN SANITASI
1 Memasang Floor Drain Stainless Kelas 1
2 Memasang Kloset Duduk Kelas 1
3 Memasang Kran Air Stainless Kelas 1
4 Memasang Wastafel + Assesoris Kelas 1
5 Cermin Wastafel (150x80 cm) + frame Alumunium
6 Memasang Pipa Air Bersih dan kotor + Aksesoris
Jenis Bahan :
Floor Drain
Kloset Duduk
Kran
Wastafel
Pipa
Seal Tape
Lem Pipa
JADWAL PENGGUNAAN BAHAN
NO. URAIAN PEKERJAAN BULAN KE I BULAN KE II BULAN KE III BULAN KE IV BULAN KE V BULAN KE VI BULAN KE VII
1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2

PEMBANGUNAN MUSALLA
A PEKERJAAN TANAH
1 Galian Tanah Pondasi Menerus
2 Urugan Tanah Kembali
3 Urugan Pasir Bawah Pondasi t= 10 cm
Jenis Bahan :
pasir Urug

B PEKERJAAN PONDASI DAN BETON


1 Aastamping
2 Pasangan Batu Pondasi Menerus 1:2
3 Pasir Urug Bawah Lantai
Jenis Bahan :
pasir Urug
Batu Belah
Batu gunung
Semen Portland
4 Beton K-100 Lantai selasar T = 10 cm
5 Sloof Beton Bertulang (20/30)
6 Kolom (30 x 30)
7 Kolom Praktis (13/13)
8 Ring Balk (20/40)
9 Plat Dackt=12 cm
Jenis Bahan :
Kerikil beton
Pasir beton
Semen Portland
Air
Besi beton
Kayu Kelas III
Paku 5 cm - 10 cm
Minyak bekisting
Balok Kayu Kelas II
Plywood tebal 9 mm
Dolken Kayu ø 8 -10/400 cm
JADWAL PENGGUNAAN BAHAN
NO. URAIAN PEKERJAAN BULAN KE I BULAN KE II BULAN KE III BULAN KE IV BULAN KE V BULAN KE VI BULAN KE VII
1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2
C PEKERJAAN PASANGAN DAN PLESTERAN
1 Pasangan Dinding bata 1 : 4
2 Plesteran Dinding 1 : 4
3 Pasangan Dinding bata 1 : 2
4 Plesteran Dinding 1 : 2
Jenis Bahan :
Pasir pasang
Bata merah
Semen Portland

D PEKERJAAN PINTU, JENDELA DAN VENTILASI


1 Kusen Pintu dan Ventilasi
2 Pintu Tipe P1
3 Pintu Tipe P2
Jenis Bahan :
Kayu Klas I
paku
4 Kunci pintu P1
5 Kunci pintu P2
6 Ventilasi
7 Pengunci Pintu + Aksesoris
8 Engsel Pintu

E PEKERJAAN LANTAI
1 Timbunan Tanah bawah Lantai
2 Urugan Pasir Bawah Lantai
Jenis Bahan :
Tanah Timbun
Pasir Urug
3 Beton Cor 1:3:5
Jenis Bahan :
Pasir Beton
Semen Portland
Kerikil beton
Air
4 Lantai Keramik 40 x 40 Cm
Jenis Bahan :
Keramik
Pasir Pasang
Semen Portland
JADWAL PENGGUNAAN BAHAN
NO. URAIAN PEKERJAAN BULAN KE I BULAN KE II BULAN KE III BULAN KE IV BULAN KE V BULAN KE VI BULAN KE VII
1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2
F PEKERJAAN ATAP
1 Rangka kuda-kuda Metal Zincalume 0.75 mm
2 Atap Genteng metal 3mm
3 Rabung metal Zincalume 3mm
4 Listplank Kayu Kelas 1
Jenis Bahan :
Rangka Profil C Truss
Seng Metal
Rabung metal
Kayu Klas I

H PEKERJAAN PENGECATAN
1 Cat Dinding Tembok
Jenis Bahan :
Cat Tembok

I PEKERJAAN ELEKTRIKAL
3 Instalasi titik lampu + Kabel NYA 2,5
4 Lampu Hemat Energi
6 Out Fitting Lamp ( Fitting + Lampu Hemat Energy 18 Watt )
7 Stop Kontak 3 Phase Lengkap Kelas 1
8 Stop Kontak 1 Phase Lengkap Kelas 1
9 Saklar Ganda Lengkap Kelas 1

J PEKERJAAN LAIN-LAIN
1 Pembongkaran Beton
2 Perbaiki Instalasi Air
Jenis Bahan :
Pipa
Seal Tape
Lem Pipa
3 Perbaiki Plafond Bocor

###
###

###
###
JADWAL PENGGUNAAN PERALATAN
PEKERJAAN KONSTRUKSI FISIK PEMBANGUNAN PERTOKOAN TRINGGADENG 2 LANTAI
LOKASI TRIENGGADENG - KAB. PIDIE JAYA
SKPA DINAS PERINDUSTRIAN DAN PERDAGANGAN ACEH
TAHUN ANGGARAN 2018

JADWAL PENGGUNAAN BAHAN


NO. URAIAN PEKERJAAN BULAN KE I BULAN KE II BULAN KE III BULAN KE IV BULAN KE V BULAN KE VI BULAN KE VII
1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2
PERLUASAN GEDUNG KANTOR
A PEKERJAAN PERSIAPAN
1 Err:509
Jenis Alat :
Mobil Pick Up
Kereta Sorong
2 Pengukuran dan Pembuatan Bouwplank
Jenis Alat :
Alat Pertukangan
3 Direksi Keet
Jenis Alat :
Alat Pertukangan
4 Pembuatan Papan Nama Proyek
Jenis Alat :
Alat Pertukangan
5 Dokumentasi dan Pelaporan
Jenis Alat :
Kamera
Komputer / Laptop
Printer
6 Keselamatan Kerja (K3)
Jenis Alat :
Safety Boot
Helm Proyek
Sarung Tangan
Kotak P3K
JADWAL PENGGUNAAN BAHAN
NO. URAIAN PEKERJAAN BULAN KE I BULAN KE II BULAN KE III BULAN KE IV BULAN KE V BULAN KE VI BULAN KE VII
1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2
B PEKERJAAN TANAH
1 Galian Tanah Pondasi Tapak
2 Galian Tanah Pondasi Menerus
3 Urugan Tanah Kembali
4 Urugan Pasir Bawah Pondasi t= 10 cm
Jenis Alat :
Alat Pertukangan
Kereta Sorong

C PEKERJAAN PONDASI DAN BETON


1 Aanstamping pada Pondasi Tapak
Jenis Alat :
Alat Pertukangan
Kereta Sorong
2 Pasangan Batu Pondasi Menerus 1:2
Jenis Bahan :
Alat Pertukangan
Kereta Sorong
3 Lantai Kerja T = 5 Cm K-100
Jenis Alat :
Alat Pertukangan
Kereta Sorong
5 Pondasi Tapak (80/80)
6 Sloof Beton Bertulang (25/40)
7 Sloof Beton Bertulang (20/30)
8 Balok Beton Bertulang (25/30)
12 Kolom (40 x 40)
13 Kolom Praktis (13/13)
16 Plat Lantai t=12 cm
Jenis Alat :
Molen
Alat Pertukangan
Kereta Sorong
Mesin pompa
D PEKERJAAN PASANGAN DAN PLESTERAN
1 Pasangan Dinding bata 1 : 4
2 Plesteran Dinding 1 : 4
3 Pasangan Dinding bata 1 : 2
JADWAL PENGGUNAAN BAHAN
NO. URAIAN PEKERJAAN BULAN KE I BULAN KE II BULAN KE III BULAN KE IV BULAN KE V BULAN KE VI BULAN KE VII
1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2
4 Plesteran Dinding 1 : 2
Jenis Alat :
Alat Pertukangan
Kereta Sorong

E PEKERJAAN PINTU, JENDELA DAN VENTILASI


1 Dinding Partisi Aluminium
2 Kusen Pintu dan Ventilasi Alumunium
3 Pintu Tipe P1
5 Pintu Tipe P3 KM/WC
6 Kunci pintu P1
9 Pengunci Pintu + Aksesoris
10 Engsel Pintu
Jenis Alat :
Alat Pertukangan
Bor Listrik

F PEKERJAAN LANTAI
1 Timbunan Tanah bawah Lantai
Jenis Alat :
Alat Pertukangan
2 Urugan Pasir Bawah Lantai
Jenis Alat :
Alat Pertukangan
3 Beton Cor 1:3:5
Jenis Alat :
Molen
Kereta Sorong
5 Lantai Keramik 40 x 40 Cm
6 Lantai Keramik 20 x 20 Cm KM/WC
7 Pasangan dinding keramik 20 x 25 cm
Jenis Alat :
Water Pass
Alat Pertukangan
JADWAL PENGGUNAAN BAHAN
NO. URAIAN PEKERJAAN BULAN KE I BULAN KE II BULAN KE III BULAN KE IV BULAN KE V BULAN KE VI BULAN KE VII
1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2

H PEKERJAAN PLAFOND
1 Rangka Plafond ( Furing )
2 Plafond Gypsum Board 8 mm
3 List Plafond
Jenis Alat :
Bor Listrik
Alat Pertukangan
Water Pass

I PEKERJAAN PENGECATAN
1 Cat Dinding Tembok
2 Cat Kusen, Pintu, dan Ventilasi
Jenis Alat :
Kuas/Roll

J PEKERJAAN ELEKTRIKAL
3 Instalasi titik lampu + Kabel NYA 2,5
4 Lampu Hemat Energi
6 Out Fitting Lamp ( Fitting + Lampu Hemat Energy 18 Watt )
7 Stop Kontak 3 Phase Lengkap Kelas 1
8 Stop Kontak 1 Phase Lengkap Kelas 1
9 Saklar Ganda Lengkap Kelas 1
Jenis Alat :
Alat Tool Listrik
Alat Pertukangan

K PEKERJAAN SANITASI
1 Memasang Floor Drain Stainless Kelas 1
2 Memasang Kloset Duduk Kelas 1
3 Memasang Kran Air Stainless Kelas 1
4 Memasang Wastafel + Assesoris Kelas 1
5 Cermin Wastafel (150x80 cm) + frame Alumunium
6 Memasang Pipa Air Bersih dan kotor + Aksesoris
Jenis Alat :
Alat Pertukangan
JADWAL PENGGUNAAN BAHAN
NO. URAIAN PEKERJAAN BULAN KE I BULAN KE II BULAN KE III BULAN KE IV BULAN KE V BULAN KE VI BULAN KE VII
1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2

PEMBANGUNAN MUSALLA
A PEKERJAAN TANAH
1 Galian Tanah Pondasi Menerus
2 Urugan Tanah Kembali
3 Urugan Pasir Bawah Pondasi t= 10 cm
Jenis Alat :
Kereta Sorong
Cangkul
Sekop

B PEKERJAAN PONDASI DAN BETON


1 Aastamping
2 Pasangan Batu Pondasi Menerus 1:2
3 Pasir Urug Bawah Lantai
Jenis Alat :
Alat Pertukangan
4 Beton K-100 Lantai selasar T = 10 cm
5 Sloof Beton Bertulang (20/30)
6 Kolom (30 x 30)
7 Kolom Praktis (13/13)
8 Ring Balk (20/40)
9 Plat Dackt=12 cm
Jenis Alat :
Alat Pertukangan
Molen
Kereta Sorong
Mesin Pompa Air
Perancah
Water Pass
JADWAL PENGGUNAAN BAHAN
NO. URAIAN PEKERJAAN BULAN KE I BULAN KE II BULAN KE III BULAN KE IV BULAN KE V BULAN KE VI BULAN KE VII
1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2
C PEKERJAAN PASANGAN DAN PLESTERAN
1 Pasangan Dinding bata 1 : 4
2 Plesteran Dinding 1 : 4
3 Pasangan Dinding bata 1 : 2
4 Plesteran Dinding 1 : 2
Jenis Alat :
Alat Pertukangan
Water Pass
Kereta Sorong

D PEKERJAAN PINTU, JENDELA DAN VENTILASI


1 Kusen Pintu dan Ventilasi
2 Pintu Tipe P1
3 Pintu Tipe P2
Jenis Alat :
Alat Pertukangan
4 Kunci pintu P1
5 Kunci pintu P2
6 Ventilasi
7 Pengunci Pintu + Aksesoris
8 Engsel Pintu

E PEKERJAAN LANTAI
1 Timbunan Tanah bawah Lantai
2 Urugan Pasir Bawah Lantai
Jenis Alat :
Kereta Sorong
Alat Pertukangan
3 Beton Cor 1:3:5
Jenis Alat :
Kereta Sorong
Alat Pertukangan
4 Lantai Keramik 40 x 40 Cm
Jenis Alat :
WaterPass
Alat Pertukangan
JADWAL PENGGUNAAN BAHAN
NO. URAIAN PEKERJAAN BULAN KE I BULAN KE II BULAN KE III BULAN KE IV BULAN KE V BULAN KE VI BULAN KE VII
1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2
F PEKERJAAN ATAP
1 Rangka kuda-kuda Metal Zincalume 0.75 mm
2 Atap Genteng metal 3mm
3 Rabung metal Zincalume 3mm
4 Listplank Kayu Kelas 1
Jenis Alat :
Bor Listrik
Alat Pertukangan

H PEKERJAAN PENGECATAN
1 Cat Dinding Tembok
Jenis Alat :
Kuas/Roll

I PEKERJAAN ELEKTRIKAL
3 Instalasi titik lampu + Kabel NYA 2,5
4 Lampu Hemat Energi
6 Out Fitting Lamp ( Fitting + Lampu Hemat Energy 18 Watt )
7 Stop Kontak 3 Phase Lengkap Kelas 1
8 Stop Kontak 1 Phase Lengkap Kelas 1
9 Saklar Ganda Lengkap Kelas 1
Jenis Alat :
Alat Tool Listrik
Alat Pertukangan

J PEKERJAAN LAIN-LAIN
1 Pembongkaran Beton
2 Perbaiki Instalasi Air
3 Perbaiki Plafond Bocor
Jenis Alat :
Mobil Pick Up
Alat Pertukangan
Kereta Sorong
###
###

###
JADWAL PENGGUNAAN BAHAN
NO. URAIAN PEKERJAAN BULAN KE I BULAN KE II BULAN KE III BULAN KE IV BULAN KE V BULAN KE VI BULAN KE VII
1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2
###
JADWAL PERSONIL INTI

PEKERJAAN KONSTRUKSI FISIK PEMBANGUNAN PERTOKOAN TRINGGADENG 2 LANTAI


LOKASI TRIENGGADENG - KAB. PIDIE JAYA
SKPA DINAS PERINDUSTRIAN DAN PERDAGANGAN ACEH
TAHUN ANGGARAN 2018

Jadwal Personil Inti


No. Nama Personil Jabatan Jumlah Sat Bulan- I Bulan- II Bulan- III Bulan- IV Bulan- V Bulan- VI Bln- VII
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26

1 Rahmanullah, ST Manager Proyek 1 Orang

2 Rd. Cecep Yudhie Erba Winata, ST Pelaksana Lapangan 1 Orang

3 Rusmen Effendi, ST Pelaksana lapangan 1 Orang

4 Bayhaqi, ST Mandor Lapangan 1 Orang

5 Twk. Mohd. Iqbal, A.Md Tenaga Admin 1 Orang

Err:509
Err:509

-
-
BACK-UP DATA

PROYEK : TANGGAL PEKERJAAN :


PELAKSANA :
KONSULTAN SUPERV :

ITEM PEKERJAAN : II. PEKERJAAN LANTAI I


VOLUME
LEBAR LEBAR
ITEM PEKERJAAN PANJANG LEBAR
(L) ATAS BAWAH(L TINGGI
(T)
JUMLAH/U JUMLA
NIT (N1) H (N) RUMUS VOLUME SAT. KET
(P) (LA) B)
II. PEKERJAAN LANTAI I
A. PEKERJAAN GALIAN TANAH DAN PONDASI
1.Galian Tanah Pondasi Tapak
Pondasi Tapak TP-1
Pondasi Tapak TP-2 1.40 1.40 1.40 39 PXLXTXN 107.02 m3
107.02 m3

2 Galian Tanah Pondasi Menerus


Pondasi Menerus pagar 78.00 0.8 0.5 1 PXLXTXN 31.20 m3
31.20 m3

Urungan Kembali Galian Tanah Pondasi Tapak 1/3 x Vol. Galian 26.75 m3
-
6 Urungan Kembali Galian Tanah Pondasi Menerus 1/3 x Vol. Galian 7.80 m3
Urungan Pasir Alas Pondasi Tapak
Pondasi Tapak TP-1
Pondasi Tapak TP-2 1.00 1.00 0.05 39 PXLXTXN 1.95 m3
1.95 m3

10 Urungan Pasir Alas Pondasi Menerus t = 5 cm


Pondasi Menerus Ruangan 78.00 0.8 0.05 1 PXLXTXN 3.12 m3
3.12 m3

16 Pas. Batu Kosong /Aanstamping Pondasi Meneru

Pondasi Tapak TP-2 1.20 1.20 0.10 39 PXLXTXN 5.62 m3


Pondasi Menerus Ruangan 0.80 192 0.10 1 PXLXTXN 15.36 m3

20.98 m3

17 Pas. Batu Kali 1 : 4 #REF!


Pondasi Menerus Ruangan 220.00 0.425 0.25 0.6 0.5 1 PXLXTXN 46.75 m3
46.75 m3
Catatan :

BACK-UP DATA

PROYEK : TANGGAL PEKERJAAN :


PELAKSANA :
KONSULTAN SUPERV :

PEKERJAAN PASANGAN DAN PLESTERAN


PEKERJAAN PASANGAN DAN PLESTERAN

VOLUME
LEBAR LEBAR
ITEM PEKERJAAN PANJANG LEBAR ATAS BAWAH(L TINGGI JUMLAH/U JUMLA RUMUS VOLUME SAT. KET
(P) (L) (LA) B) (T) NIT (N1) H (N)
PEKERJAAN PASANGAN DAN PLESTERAN

Pas. Bata Tebal 1/2 Camp. 1 : 4


pagar type 1 2.83 0.30 6.00 P xT x N1 5.09 m2
pagar type 2 2.90 0.30 6.00 P xT x N1 5.22 m2
pagar type 3 3.00 0.30 4.00 P xT x N1 3.60 m2
3.39 1.55 6.00 P xT x N1 31.53
pagar type 4 3.50 1.55 5.00 P xT x N1 27.13 m2
pagar type 5 3.57 1.55 10.00 P xT x N1 55.34 m2
pagar type 6 3.45 1.55 8.00 P xT x N1 42.78 m2
pagar type 7 3.34 1.55 12.00 P xT x N1 62.12 0
pagar type 8 3.11 1.55 5.00 P xT x N1 24.10 m2
pagar type 9 2.81 1.55 4.00 P xT x N1 17.42 m2
pagar type 10 3.34 1.55 6.00 P xT x N1 31.06 m2
pagar type 11 2.28 0.30 6.00 P xT x N1 4.10 0
309.50 m2

Plesteran Dinding 1 : 4 luas bidang


309.50 2 luas x sisi 618.99 m2

Bungkus Tiang Pagar Dengan Bata 1:4


pagar type 1 1.34 1.70 7.00 P xT x N1 15.95 m2
pagar type 2 1.34 1.70 8.00 P xT x N1 18.22 m2
pagar type 3 1.34 1.70 4.00 P xT x N1 9.11 m2
0.67 1.70 6.00 P xT x N1 6.83 m2
pagar type 11 1.34 1.70 6.00 P xT x N2 13.67 m2
63.78 m2

- Suspension Rod/ Penggantung luas bidang


63.78 2 luas x sisi 127.57 m2
Acian Beton Bertulang
KOLOM 20/20 K2 0.27 3.85 59 luas x T x N1 61.33 m2
RING BALOK 20/20 RB 1 195.90 0.47 1 luas x T x N2 92.07 m2
Volume 153.40 m2

PEKERJAAN PAPAN NAMA


PEKERJAAN GALIAN TANAH DAN PONDASI
1.Galian Tanah Pondasi Tapak
Pondasi Tapak TP-1 0.80 0.80 1.00 2 PXLXTXN 1.28
Pondasi Tapak TP-2 1.00 1.00 1.00 3 PXLXTXN 3.00 m3
4.28 m3

#NAME?
Pondasi Menerus pagar m3
m3

Urungan Kembali Galian Tanah Pondasi Tapak 1/3 x Vol. Galian 1.43 m3
-
Urungan Pasir Alas Pondasi Tapak 1/3 x Vol. Galian - m3
Urungan Pasir Alas Pondasi Tapak
Pondasi Tapak TP-1 0.80 0.80 0.05 2 PXLXTXN 0.06
Pondasi Tapak TP-2 1.00 1.00 0.05 3 PXLXTXN 0.15 m3
0.21 m3

Pas. Batu Kosong /Aanstamping Pondasi Tapak t =


0.80 0.80 0.10 2 PXLXTXN 0.13
Pondasi Tapak TP-2 1.00 1.00 0.10 3 PXLXTXN 0.30 m3

0.43 m3
Urugan Tanah
12.00 0.70 0.50 1 PXLXTXN 4.20

Catatan :

BACK-UP DATA
PROYEK : TANGGAL PEKERJAAN :
PELAKSANA :
KONSULTAN SUPERV :

PEKERJAAN PASANGAN DAN PLESTERAN

VOLUME
LEBAR LEBAR
ITEM PEKERJAAN PANJANG LEBAR ATAS BAWAH(L TINGGI JUMLAH/U JUMLA RUMUS VOLUME SAT. KET
(P) (L) (LA) B) (T) NIT (N1) H (N)
-Tarikan Jendela dan Jalusi

Dengan perangkat tambahan :


pagar type 1 2.83 0.30 6.00 P xT x N1 5.09 m2
pagar type 2 2.90 0.30 6.00 P xT x N1 5.22 m2
pagar type 3 3.00 0.30 4.00 P xT x N1 3.60 m2
3.39 1.55 6.00 P xT x N1 31.53
pagar type 4 3.50 1.55 5.00 P xT x N1 27.13 m2
pagar type 5 3.57 1.55 10.00 P xT x N1 55.34 m2
pagar type 6 3.45 1.55 8.00 P xT x N1 42.78 m2
pagar type 7 3.34 1.55 12.00 P xT x N1 62.12 0
pagar type 8 3.11 1.55 5.00 P xT x N1 24.10 m2
pagar type 9 2.81 1.55 4.00 P xT x N1 17.42 m2
pagar type 10 3.34 1.55 6.00 P xT x N1 31.06 m2
pagar type 11 2.28 0.30 6.00 P xT x N1 4.10 0
309.50 m2

-Kaca Polos 5 mm luas bidang


309.50 2 luas x sisi 618.99 m2

0.00
pagar type 1 1.34 1.70 7.00 P xT x N1 15.95 m2
pagar type 2 1.34 1.70 8.00 P xT x N1 18.22 m2
pagar type 3 1.34 1.70 4.00 P xT x N1 9.11 m2
0.67 1.70 6.00 P xT x N1 6.83 m2
pagar type 11 1.34 1.70 6.00 P xT x N2 13.67 m2
63.78 m2

Dengan perangkat tambahan : luas bidang


63.78 2 luas x sisi 127.57 m2
Acian Beton Bertulang
KOLOM 20/20 K2 0.27 3.85 59 luas x T x N1 61.33 m2
RING BALOK 20/20 RB 1 12.15 0.47 1 luas x T x N2 5.71 m2
Volume 67.04 m2

PEKERJAAN LANTAI DAN DINDING


i Keramik Teras dan Selasar 60 x 60 Cm Unpolished
teras 1.94 15.85 1.00 P x L x x N1 30.75 #REF!
2.00 4 1.00 P x L x T x N2 8.00 #REF!
2.75 3 0.00 P x L x T x N3 - #REF!
selasar 0.92 116 1.00 P x L x T x N4 106.72 #REF!
volume urugan pasir 145.47 #REF!

Lantai Keramik Tangga 60 x 60 Cm Unpolished


bordes 3.87 1.75 1.00 P x L x x N1 6.77 #REF!
1.00 P x L x T x N2 - #REF!
1.00 P x L x T x N3 - #REF!
anak tangga 0.48 1.7 22.00 P x L x T x N4 17.95 #REF!
volume urugan pasir 24.72 #REF!

ntai Keramik KM/WC/Lavatori 30 x 30 Cm Unpolihed


km/wc 1 1.37 1.62 1.00 P x L x x N1 2.22 #REF!
0.13 0.8 1.00 P x L x T x N2 0.10 #REF!
0.10 1.37 1.00 P x L x T x N3 0.14 #REF!

km wc difabel 1.81 1.81 1.00 P x L x T x N4 3.28 #REF!

km wc umum 2.06 2.81 2.00 P x L x T x N4 11.58 #REF!


1.33 1.58 4.00 P x L x T x N4 8.41 0
lavatori 1.70 3.87 2.00 P x L x T x N4 13.16 #REF!
volume urugan pasir 38.88 #REF!

Dinding Keramik KM/WC 30 x 30 Cm panajng pemgurangan kusen volume tinggi


km/wc r dokter 5.98 1.95 4.03 2.50 VxT 10.07 m2

km/wc difabel 7.40 1.95 5.45 2.50 P x L x T x N3 13.62 m2

kmwc umum 10.89 5.38 5.51 2.50 2 P x L x T x N3 27.55 m2


23.92 7.81 16.11 2.50 1 P x L x T x N4 40.26 m2
volume urugan pasir 91.49 m2
PEKERJAAN PLAFOND
Pasang Langit - langit Plafond PVC Bermotif +
perangkat tambahan :
ruangan 7.87 5.54 1.00 P x L x x N1 43.60 m2
3.87 4.16 1.00 P x L x T x N2 16.10 0
3.87 1.34 1.00 P x L x T x N3 5.19 m2
3.87 2.67 1.00 P x L x T x N4 10.33 m2
3.87 4.12 1.00 P x L x T x N5 15.94 0
2.35 1.71 1.00 P x L x T x N6 4.02 m2
3.87 3.12 3.00 P x L x T x N7 36.22 m2
2.12 3.87 1.00 P x L x T x N5 8.20 m2
3.87 7.85 1.00 P x L x T x N6 30.38 m2
2.20 8.05 1.00 P x L x T x N7 17.71 m2
1.65 4.3 1.00 P x L x T x N8 7.10 m2
0.73 1.46 1.00 P x L x T x N9 1.06 m2
7.87 2 1.00 P x L x T x N5 15.74 m2
4.10 2 1.00 P x L x T x N6 8.20 m2
1.87 2 1.00 P x L x T x N7 3.74 0
3.95 4.09 1.00 P x L x T x N5 16.16 m2
4.00 4.07 1.00 P x L x T x N6 16.28 m2
1.00 P x L x T x N7 - m2
5.87 3.87 1.00 P x L x T x N5 22.72 m2
3.87 3.87 5.00 P x L x T x N6 74.88 m2
teras 1.85 3.75 4.00 P x L x x N1 27.75 0
2.00 3.75 3.00 P x L x T x N2 22.50 m2
2.75 3 0.00 P x L x T x N3 - m2
volume plafond 403.82 m2

PEKERJAAN ATAP
- Kuda - Kuda Baja Ringan c 100 panajng lebar Jumalh ( N )
2.73 3.55 2.00 PxLx N 19.38 m2

Atap Seng Genteng Multiroof 0,35 mm New Emerald 2.83 3.55 2.00 PxLx N 20.09 m3

sang Rabung Atap Seng Genteng Multiroof 0,35 mm 3.55 1.00 PxLx N 3.55 m1

Pasang Listplank Kayu 2.5/30 cm


2.73 2.00 PxLx N 5.46 m1
3.40 2.00 PxLx N 6.80 m1
volume 12.26 m1

Catatan :

Diajukan Oleh
Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
PT. POLADA MUTIARA ACE

Muhajir Rahmad
Direktur

PROYEK : TANGGAL PEKERJAAN :


PELAKSANA :
KONSULTAN SUPERV :

ITEM PEKERJAAN : II. PEKERJAAN LANTAI II

VOLUME
LEBAR LEBAR LEBAR TINGGI JUMLAH/U JUMLA
ITEM PEKERJAAN PANJANG (L) ATAS BAWAH(L (T) NIT (N1) H (N) RUMUS VOLUME SAT. KET
(P) (LA) B)
III. PEKERJAAN LANTAI II
A PEKERJAAN BETON BERTULANG
1 Kolom 30/40 - K1
- Beton Cor 0.30 0.4 3.40 55 PXLXTXN 22.44 m3
- Besi Beton Ulir 4.20 12.00 55 Berat Besi = P x N1 x N x Koef 4,379.76 Kg
- Besi Beton Polos 1.18 27.2 55 Berat Besi = P x N1 x N x Koef 1,094.47 Kg
- Bekisting 1.40 3.40 55 PXTXN 261.80 m2
- Pembongkaran dan Penyiraman = Volume Beton ------------------------------------------------------------------------------------------------------------------------ 22.44 m3

2 Kolom 13/40 - K5
- Beton Cor 1.86 m3 1.44
0.13 0.4 3.57 10 PXLTXN 1.86 m3
0.13 0.4 4.35 0 PXLTXN - m3
- Besi Beton Ulir
- Besi Beton Polos 225.65 Kg
besi 10 3.57 8 10 Berat Besi = P x N1 x N x Koef 177.07 Kg 251.21
besi 6 0.92 24 10 Berat Besi = P x N1 x N x Koef 48.58 Kg

- Bekisting 37.84 m2 39.75


1.06 3.57 10 PXTXN 37.84 m2

- Pembongkaran dan Penyiraman = Volume Beton ------------------------------------------------------------------------------------------------------------------------ 1.86 m3

3 Kolom 10/40 - KF
- Beton Cor 0.10 0.4 2.44 4 PXLTXN 0.39 m3 0.41
- Besi Beton Ulir
- Besi Beton Polos 29.44 Kg 62.45
2.44 8 4 Berat Besi = P x N1 x N x Koef 17.18 Kg
0.82 17.00 4 Berat Besi = P x N1 x N x Koef 12.27 Kg
- Bekisting 1.00 2.44 4 PXTXN 9.76 m2 10.2
- Pembongkaran dan Penyiraman = Volume Beton ------------------------------------------------------------------------------------------------------------------------ 0.39 m3
4 Kolom Praktis 13/13
- Beton Cor 0.13 0.13 3.40 25 PXLTXN 1.44 m3
- Besi Beton Polos 261.40 Kg
3.40 4.00 25 Berat Besi = P x N1 x N x Koef 210.80 Kg
0.40 23.00 25 Berat Besi = P x N1 x N x Koef 50.60 Kg
- Bekisting 0.30 3.40 25 PXTXN 25.50 m2
- Pembongkaran dan Penyiraman = Volume Beton ------------------------------------------------------------------------------------------------------------------------ 1.44 m3

5 Kolom 20/20 - KA
- Beton Cor 0.20 0.2 0.50 46 PXLTXN 0.92 m3 1.48
- Besi Beton Ulir 1.05 4 46 Berat Besi = P x N1 x N x Koef 233.77 Kg 179.08
- Besi Beton Polos 0.68 4.00 46 Berat Besi = P x N1 x N x Koef 48.80 Kg 46.41
- Bekisting 0.80 0.50 46 PXTXN 18.40 m2 29.6
- Pembongkaran dan Penyiraman = Volume Beton ------------------------------------------------------------------------------------------------------------------------ 0.92 m3

6 Balok Latai 13/20


- Beton Cor 195.00 0.13 0.20 1 PXLTXN 5.07 m3 5.98
- Besi Beton Polos 577.98 Kg 731.82
195.00 4 1 Berat Besi = P x N1 x N x Koef 483.60 Kg
0.33 1,300.00 1 Berat Besi = P x N1 x N x Koef 94.38 Kg
- Bekisting 195.00 0.4 1 PXLXN 78.00 m2 92
- Pembongkaran dan Penyiraman = Volume Beton ------------------------------------------------------------------------------------------------------------------------ 5.07 m3

Catatan :

Diajukan Oleh
Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
PT. POLADA MUTIARA ACE

Muhajir Rahmad
Direktur

BACK-UP DATA

PROYEK : TANGGAL PEKERJAAN :


PELAKSANA :
KONSULTAN SUPERV :

ITEM PEKERJAAN : II. PEKERJAAN LANTAI I

VOLUME
LEBAR LEBAR
ITEM PEKERJAAN PANJANG LEBAR ATAS BAWAH(L TINGGI JUMLAH/U JUMLA RUMUS VOLUME SAT. KET
(L) (T) NIT (N1) H (N)
(P) (LA) B)
III. PEKERJAAN LANTAI II
A PEKERJAAN BETON BERTULANG
7 Ring Balk 20/35
- Beton Cor 23.75 m3
Beton 20/35 312.00 0.2 0.35 1 PXLTXN 21.84 m3
Beton Dack 106.30 0.15 0.12 1 PXLTXN 1.91 m3

- Besi Beton Ulir 318.00 7.00 1 Berat Besi = P x N1 x N x Koef 2,693.46 Kg


- Besi Beton Polos 1,088.86 Kg
Besi Behel 20/35 0.88 2544.00 1 Berat Besi = P x N1 x N x Koef 873.10 Kg
Dack 12/15 116.00 1.00 1 Berat Besi = P x N1 x N x Koef 71.92 Kg
0.40 580.00 1 Berat Besi = P x N1 x N x Koef 143.84 Kg
- Bekisting 172.25 m2
Ring Balok 20/35 205.07 0.7 1 PXLXN 143.55 m2
106.30 0.27 1 PXLXN 28.70 m2
Dack 12/15 - 0.27 1 PXLXN - m2
- Pembongkaran dan Penyiraman = Volume Beton ------------------------------------------------------------------------------------------------------------------------ 23.75 m3

8 Ring Balk 15/25


- Beton Cor 269.20 0.15 0.25 1 PXLTXN 10.10 m3
- Besi Beton Polos 1,512.79 Kg
269.20 4 1 Berat Besi = P x N1 x N x Koef 958.35 Kg
0.66 2,154.00 1 Berat Besi = P x N1 x N x Koef 554.44 Kg
- Bekisting 269.20 0.5 1 PXLXN 134.60 m2
- Pembongkaran dan Penyiraman = Volume Beton ------------------------------------------------------------------------------------------------------------------------ 10.10 m3

9 Balok Top Gevel 15/25


- Beton Cor 41.12 0.15 0.25 1 PXLTXN 1.54 m3
- Besi Beton Polos 215.03 Kg
41.12 4 1 Berat Besi = P x N1 x N x Koef 146.39 Kg
0.64 275.00 1 Berat Besi = P x N1 x N x Koef 68.64 Kg
- Bekisting 41.12 0.5 1 PXLXN 20.56 m2
- Pembongkaran dan Penyiraman = Volume Beton ------------------------------------------------------------------------------------------------------------------------ 1.54 m3

10 Plat Daag t = 10 cm
- Beton Cor 4.84 m3
5.80 5.8 0.12 1 PXLTXN 4.04 m3
3.87 1.73 0.12 1 PXLTXN 0.80 m3
- Besi Beton Polos 515.08 Kg
5.94 58 1 Berat Besi = P x N1 x N x Koef 213.60 Kg
5.94 58 1 Berat Besi = P x N1 x N x Koef 213.60 Kg
4.01 17.3 1 Berat Besi = P x N1 x N x Koef 43.01 Kg
1.87 38.7 1 Berat Besi = P x N1 x N x Koef 44.87 Kg
- Bekisting 40.34 m2
5.80 5.8 1 PXLXN 33.64 m2
3.87 1.73 1 PXLXN 6.70 m2
- Pembongkaran dan Penyiraman = Volume Beton ------------------------------------------------------------------------------------------------------------------------ 4.84 m3
11 Plat Kanopy t = 7 cm
- Beton Cor 0.89 m3
0.58 0.4 0.07 7 PXLTXN 0.11 m3
1.82 0.4 0.07 12 PXLTXN 0.61 m3
1.30 0.4 0.07 1 PXLTXN 0.04 m3
4.70 0.4 0.07 1 PXLTXN 0.13 m3

- Besi Beton Polos 54.72 Kg


0.58 1.75 7 Berat Besi = P x N1 x N x Koef 4.41 Kg
0.40 2.90 7 Berat Besi = P x N1 x N x Koef 5.03 Kg
1.82 3.50 4 Berat Besi = P x N1 x N x Koef 15.80 Kg
0.40 9.10 4 Berat Besi = P x N1 x N x Koef 9.03 Kg
1.30 3.50 1 Berat Besi = P x N1 x N x Koef 2.82 Kg
0.40 6.50 1 Berat Besi = P x N1 x N x Koef 1.61 Kg
4.70 3.50 1 Berat Besi = P x N1 x N x Koef 10.20 Kg
0.40 23.50 1 Berat Besi = P x N1 x N x Koef 5.83 Kg
- - 2 Berat Besi = P x N1 x N x Koef - Kg
- 2 Berat Besi = P x N1 x N x Koef - Kg
- Bekisting 8.40 0.57 4 PXLXN 19.15 m2
- Pembongkaran dan Penyiraman = Volume Beton ------------------------------------------------------------------------------------------------------------------------ 0.89 m3

Catatan :

Diajukan Oleh
Direksi Teknis Konsultan Supervisi Kontraktor Pelaksana
PT. POLADA MUTIARA ACE

Muhajir Rahmad
Direktur
Pondasi Tapak 120 x 120 cm (TP1)
BESI
DIMENSIONS BJ PANJANG BATANG JUMLAH BIAS TOTAL VOL.
KETERANGAN Ø BESI
PREVIEW (Kg/M1) (M1) (Bh) (M1) (UNIT) (M1) Kg

Besi Memanjang 14.00 1.21 2.76 7.00 19.32 39.00 753.48 911.7108
Besi Melintang 14.00 1.21 2.76 7.00 19.32 39.00 753.48 911.7108 1.14

JUMLAH : 1,823.42
BEKISTING
JUMLAH BIAS VOLUME VOL.
KETERANGAN PANJANG LEBAR SISI
(M2) (UNIT) (M2) X PAKAI

Bekisting 1.20 0.20 4.00 0.96 39.00 37.44 37.44

JUMLAH : 37.44
BETON
JUMLAH BIAS VOLUME VOL.
KETERANGAN PANJANG LEBAR TINGGI
(M2) (UNIT) (M3) BETON

Beton Bertulang 1.20 1.20 0.20 0.29 39.00 11.23 11.23

JUMLAH : 11.23
Kolom Pedestal 25/35 - K1
BESI
DIMENSIONS BJ PANJANG BATANG JUMLAH BIAS TOTAL VOL.
KETERANGAN Ø BESI
PREVIEW (Kg/M1) (M1) (Bh) (M1) (UNIT) (M1) Kg

Besi Memanjang Ulir 14.00 1.21 2.25 8.00 18.00 39.00 702.00 849.42
Besi Begel 10.00 0.62 0.98 14.00 13.72 39.00 535.08 331.75

JUMLAH :
BEKISTING
JUMLAH BIAS VOLUME VOL.
KETERANGAN PANJANG LEBAR SISI
(M2) (UNIT) (M2) 1X PAKAI

Bekisting 1.25 1.20 1.00 1.50 39.00 58.50 58.50

JUMLAH : 58.50
BETON
JUMLAH BIAS VOLUME VOL.
KETERANGAN PANJANG LEBAR TINGGI
(M2) (UNIT) (M3) BETON

Beton Bertulang 0.25 0.35 1.25 0.11 39.00 4.27 4.27

JUMLAH : 4.27
Kolom Pedestal 20/20 - K2
BESI
DIMENSIONS BJ PANJANG BATANG JUMLAH BIAS TOTAL VOL.
KETERANGAN Ø BESI
PREVIEW (Kg/M1) (M1) (Bh) (M1) (UNIT) (M1) Kg

Besi Memanjang 12.00 0.89 2.25 6.00 13.50 59.00 796.50 708.89
Besi Begel 6.00 0.22 0.66 8.00 5.28 59.00 311.52 68.53

JUMLAH : 777.42
BEKISTING
JUMLAH BIAS VOLUME VOL.
KETERANGAN PANJANG LEBAR SISI
(M2) (UNIT) (M2) 1X PAKAI

Bekisting 0.85 0.80 1.00 0.68 59.00 40.12 40.12


JUMLAH : 40.12
BETON
JUMLAH BIAS VOLUME VOL.
KETERANGAN PANJANG LEBAR TINGGI
(M2) (UNIT) (M3) BETON

Beton Bertulang 0.20 0.20 0.85 0.03 59.00 2.01 2.01

JUMLAH : 2.01
Sloof 25/35 - SL1
BESI
DIMENSIONS BJ PANJANG BATANG JUMLAH BIAS TOTAL VOL.
KETERANGAN Ø BESI
PREVIEW (Kg/M1) (M1) (Bh) (M1) (UNIT) (M1) Kg

Besi Memanjang ( ULIR ) 14.00 1.21 230.00 7.00 1,610.00 1.00 1,610.00 1,948.10 48
Besi Begel ( Polos ) 10.00 0.62 0.98 1,800.00 1,764.00 1.00 1,764.00 1,093.68 60
108
JUMLAH : 3,041.78
BEKISTING
JUMLAH BIAS VOLUME VOL.
KETERANGAN PANJANG LEBAR SISI
(M2) (UNIT) (M2) X PAKAI

Bekisting Memanjang 176.85 0.35 2.00 123.80 1.00 123.80 123.80 104
49.40 0.95 1.00 46.93 1.00 46.93 46.93 60
72
JUMLAH : 170.73 236
BETON
JUMLAH BIAS VOLUME VOL.
KETERANGAN PANJANG LEBAR TINGGI
(M2) (UNIT) (M3) BETON

Beton Memanjang 226.25 0.25 0.35 19.80 1.00 19.80 19.80


Beton Melintang

JUMLAH : 19.80
Kolom 25/35 - K1
BESI
DIMENSIONS BJ PANJANG BATANG JUMLAH BIAS TOTAL VOL.
KETERANGAN Ø BESI
PREVIEW (Kg/M1) (M1) (Bh) (M1) (UNIT) (M1) Kg

Besi Memanjang 14.00 1.21 4.20 8.00 33.60 39.00 1,310.40 1,585.58
Besi Begel 8.00 0.39 0.98 38.00 37.24 39.00 1,452.36 566.42

JUMLAH : 2,152.00
BEKISTING
JUMLAH BIAS VOLUME VOL.
KETERANGAN PANJANG LEBAR SISI
(M2) (UNIT) (M2) 1X PAKAI

Bekisting 3.80 1.20 1.00 4.56 39.00 177.84 177.84

JUMLAH : 177.84
BETON
JUMLAH BIAS VOLUME VOL.
KETERANGAN PANJANG LEBAR TINGGI
(M2) (UNIT) (M3) BETON

Beton Bertulang 0.25 0.35 3.80 0.33 39.00 12.97 12.97

JUMLAH : 12.97
Balok Latai 18/20 - BLP
BESI
DIMENSIONS BJ PANJANG BATANG JUMLAH BIAS TOTAL VOL.
KETERANGAN Ø BESI
PREVIEW (Kg/M1) (M1) (Bh) (M1) (UNIT) (M1) Kg

Besi Memanjang 12.00 0.89 120.00 4.00 480.00 1.00 480.00 427.20
Besi Begel 8.00 0.39 0.62 735.00 455.70 1.00 455.70 177.72

JUMLAH : 604.92
BEKISTING
JUMLAH BIAS VOLUME VOL. 9.75
KETERANGAN TINGGI LEBAR SISI
(M2) (UNIT) (M2) X PAKAI 110.25

Bekisting 110.25 0.58 1.00 63.95 1.00 63.95 63.95

JUMLAH : 63.95
BETON
JUMLAH BIAS VOLUME VOL.
KETERANGAN PANJANG LEBAR TINGGI
(M2) (UNIT) (M3) BETON (2,8*(4+6+4))+(1,8*(4))+(1,4*2)+(3,4*5)+(2,5*8)+(1,05*4)+(

Beton Bertulang 110.25 0.18 0.20 3.97 1.00 3.97 3.97

JUMLAH : 3.97

Balok Latai 13/15 - BLT1


BESI
DIMENSIONS BJ PANJANG BATANG JUMLAH BIAS TOTAL VOL.
KETERANGAN Ø BESI
PREVIEW (Kg/M1) (M1) (Bh) (M1) (UNIT) (M1) Kg

Besi Memanjang 10.00 0.62 116.00 4.00 464.00 1.00 464.00 287.68
Besi Begel 6.00 0.22 0.46 774.00 356.04 1.00 356.04 78.33

JUMLAH : 366.01 110.2


BEKISTING
JUMLAH BIAS VOLUME VOL.
KETERANGAN TINGGI LEBAR SISI
(M2) (UNIT) (M2) X PAKAI

Bekisting 110.00 0.15 2.00 33.00 1.00 33.00 33.00

JUMLAH : 33.00
BETON
JUMLAH BIAS VOLUME VOL.
KETERANGAN PANJANG LEBAR TINGGI
(M2) (UNIT) (M3) BETON (2,8*(4+6+4))+(1,8*(4))+(1,4*2)+(3,4*5)+(2,5*8)+(1,05*4)+(

Beton Bertulang 110.00 0.15 0.13 2.15 1.00 2.15 2.15

JUMLAH : 2.15
Balok Lantai 25/35 - B1
BESI
DIMENSIONS BJ PANJANG BATANG JUMLAH BIAS TOTAL VOL.
KETERANGAN Ø BESI
PREVIEW (Kg/M1) (M1) (Bh) (M1) (UNIT) (M1) Kg

Besi Memanjang ( Polos ) 14.00 1.21 275.00 5.00 1,375.00 1.00 1,375.00 1,663.75
Besi Memanjang ( Polos ) 12.00 0.89 275.00 4.00 1,100.00 1.00 1,100.00 979.00
Besi Begel ( Polos ) 10.00 0.62 0.98 2,200.00 2,156.00 1.00 2,156.00 1,336.72 2,315.72

JUMLAH :
BEKISTING 0.23
JUMLAH BIAS VOLUME VOL.
KETERANGAN PANJANG LEBAR SISI
(M2) (UNIT) (M2) X PAKAI

Bekisting Memanjang 268.00 0.76 1.00 203.68 1.00 203.68 203.68 78


66
JUMLAH : 203.68 130
BETON 274
JUMLAH BIAS VOLUME VOL. #REF!
KETERANGAN PANJANG LEBAR TINGGI
(M2) (UNIT) (M3) BETON

Beton Memanjang 268.00 0.25 0.23 15.41 1.00 15.41 15.41


#REF!
JUMLAH : 15.41
Balok Lantai 18/20- B2 88
BESI 104
DIMENSIONS BJ PANJANG BATANG JUMLAH BIAS TOTAL VOL. 22
KETERANGAN Ø BESI
PREVIEW (Kg/M1) (M1) (Bh) (M1) (UNIT) (M1) Kg 214

Besi Memanjang ( Polos ) 12.00 0.89 237.20 5.00 1,186.00 1.00 1,186.00 1,055.54
Besi Begel ( Polos ) 8.00 0.39 0.62 1,898.00 1,176.76 1.00 1,176.76 458.94

JUMLAH : 1,514.48
BEKISTING 0.23
JUMLAH BIAS VOLUME VOL.
KETERANGAN PANJANG LEBAR SISI
(M2) (UNIT) (M2) X PAKAI

Bekisting Memanjang 136.00 0.38 1.00 51.68 1.00 51.68 51.68 78


101.20 0.34 1.00 34.41 1.00 34.41 34.41 66
JUMLAH : 86.09 130
BETON 274
JUMLAH BIAS VOLUME VOL. #REF!
KETERANGAN PANJANG LEBAR TINGGI
(M2) (UNIT) (M3) BETON

Beton Memanjang 237.20 0.08 0.18 3.42 1.00 3.42 3.42


#REF!
JUMLAH : 3.42
Plat Lantai t = 12 cm
BESI
DIMENSIONS BJ PANJANG BATANG JUMLAH BIAS TOTAL VOL.
KETERANGAN BESI
PREVIEW (Kg/M1) (M1) (Bh)- balok (M1) (UNIT) (M1) Kg
Besi Memanjang (polos) Ø 10.00 0.62 22.15 38.00 841.70 2.00 1,683.40 1,043.71
Besi Melintang (polos) Ø 10.00 0.62 4.20 202.00 848.40 2.00 1,696.80 1,052.02
Besi Memanjang (polos) Ø 10.00 0.62 1.00 8.00 8.00 10.00 80.00 49.60
Besi Melintang (polos) Ø 10.00 0.62 0.80 10.00 8.00 10.00 80.00 49.60
BESI UTAMA Besi Memanjang (polos) Ø 10.00 0.62 26.15 38.00 993.70 2.00 1,987.40 1,232.19
Besi Melintang (polos) Ø 10.00 0.62 4.20 242.00 1,016.40 2.00 2,032.80 1,260.34
Besi Memanjang (polos) Ø 10.00 0.62 1.00 8.00 8.00 12.00 96.00 59.52
Besi Melintang (polos) Ø 10.00 0.62 0.80 10.00 8.00 12.00 96.00 59.52
Besi Melintang (polos) Ø 10.00 0.62 22.15 10.00 221.50 2.00 443.00 274.66
BESI MOMEN Besi Melintang (polos) Ø 10.00 0.62 1.00 2.00 2.00 10.00 20.00 12.40
MELINTANG Besi Melintang (polos) Ø 10.00 0.62 26.15 10.00 261.50 2.00 523.00 324.26
Besi Melintang (polos) Ø 10.00 0.62 1.00 2.00 2.00 10.00 20.00 12.40
BESI MOMEN MEMANJABesi Memanjang (polos) Ø 10.00 0.62 4.20 50.00 210.00 2.00 420.00 260.40
Besi Memanjang (polos) Ø 10.00 0.62 0.80 3.00 2.40 10.00 24.00 14.88
Besi Memanjang (polos) Ø 10.00 0.62 4.20 60.00 252.00 2.00 504.00 312.48
Besi Memanjang (polos) Ø 10.00 0.62 0.80 3.00 2.40 10.00 24.00 14.88
JUMLAH : 6,032.85
BEKISTING
JUMLAH BIAS VOLUME VOL.
KETERANGAN PANJANG LEBAR SISI
(M2) (UNIT) (M2)
Bekisting 3.70 2.70 1.00 9.99 22.00 219.78 219.78
Bekisting 0.80 3.80 1.00 3.04 22.00 66.88 66.88
Bekisting 0.80 10.00 1.00 8.00 4.00 32.00 32.00
Bekisting 0.80 1.00 1.00 0.80 2.00 1.60 1.60
JUMLAH : 320.26
BETON
JUMLAH BIAS VOLUME VOL.
KETERANGAN PANJANG LEBAR TINGGI
(M2) (UNIT) (M3) BETON
Beton Bertulang 22.00 4.10 0.12 10.82 2.00 21.65 21.65
Beton Bertulang 1.00 0.80 0.12 0.10 10.00 0.96 0.96
Beton Bertulang 26.00 4.10 0.12 12.79 2.00 25.58 25.58
Beton Bertulang 1.00 0.80 0.12 0.10 10.00 0.96 0.96
Beton Bertulang
Beton Bertulang
Beton Bertulang
Beton Bertulang
Beton Bertulang
JUMLAH : 49.15
Kolom 25/35 - K1
BESI
DIMENSIONS BJ PANJANG BATANG JUMLAH BIAS TOTAL VOL.
KETERANGAN Ø BESI
PREVIEW (Kg/M1) (M1) (Bh) (M1) (UNIT) (M1) Kg

Besi Memanjang 14.00 1.21 3.75 8.00 30.00 39.00 1,170.00 1,415.70
Besi Begel 10.00 0.62 1.14 35.00 39.90 39.00 1,556.10 964.78

JUMLAH : 2,380.48
BEKISTING
JUMLAH BIAS VOLUME VOL.
KETERANGAN PANJANG LEBAR SISI
(M2) (UNIT) (M2) 1X PAKAI

Bekisting 3.50 1.20 1.00 4.20 39.00 163.80 163.80

JUMLAH : 163.80
BETON
JUMLAH BIAS VOLUME VOL.
KETERANGAN PANJANG LEBAR TINGGI
(M2) (UNIT) (M3) BETON

Beton Bertulang 0.25 0.35 3.50 0.31 39.00 11.94 11.94

JUMLAH : 11.94
Kolom 13/13
BESI
DIMENSIONS BJ PANJANG BATANG JUMLAH BIAS TOTAL VOL.
KETERANGAN Ø BESI
PREVIEW (Kg/M1) (M1) (Bh) (M1) (UNIT) (M1) Kg

Besi Memanjang 10.00 0.62 3.75 4.00 15.00 82.00 1,230.00 762.60
Besi Begel 6.00 0.22 0.42 35.00 14.70 82.00 1,205.40 265.19

JUMLAH : 1,027.79
BEKISTING
JUMLAH BIAS VOLUME VOL.
KETERANGAN PANJANG LEBAR SISI
(M2) (UNIT) (M2) 1X PAKAI

Bekisting 3.50 0.13 2.00 0.91 82.00 74.62 37.31

JUMLAH : 37.31
BETON
JUMLAH BIAS VOLUME VOL.
KETERANGAN PANJANG LEBAR TINGGI
(M2) (UNIT) (M3) BETON

Beton Bertulang 0.13 0.13 3.50 0.06 82.00 4.85 4.85

JUMLAH : 4.85
Balok Latai 13/15 - BLT1
BESI
DIMENSIONS BJ PANJANG BATANG JUMLAH BIAS TOTAL VOL.
KETERANGAN Ø BESI
PREVIEW (Kg/M1) (M1) (Bh) (M1) (UNIT) (M1) Kg

Besi Memanjang 10.00 0.62 317.35 4.00 1,269.40 1.00 1,269.40 787.03
Besi Begel 6.00 0.22 0.46 2,116.00 973.36 1.00 973.36 214.14

JUMLAH : 1,001.17
BEKISTING
JUMLAH BIAS VOLUME VOL.
KETERANGAN TINGGI LEBAR SISI
(M2) (UNIT) (M2) X PAKAI

Bekisting 315.00 0.15 2.00 94.50 1.00 94.50 47.25

JUMLAH : 47.25
BETON
JUMLAH BIAS VOLUME VOL.
KETERANGAN PANJANG LEBAR TINGGI
(M2) (UNIT) (M3) BETON

Beton Bertulang 315.00 0.15 0.13 6.14 1.00 6.14 6.14

JUMLAH : 6.14
Ring Balok 20/25 RB1
BESI
DIMENSIONS BJ PANJANG BATANG JUMLAH BIAS TOTAL VOL.
KETERANGAN Ø BESI
PREVIEW (Kg/M1) (M1) (Bh) (M1) (UNIT) (M1) Kg

Besi Memanjang ( Polos ) 12.00 0.89 204.00 5.00 1,020.00 1.00 1,020.00 907.80
Besi Begel ( Polos ) 8.00 0.39 0.76 1,632.00 1,240.32 1.00 1,240.32 483.72 #REF!

JUMLAH : 1,391.52
BEKISTING
JUMLAH BIAS VOLUME VOL.
KETERANGAN PANJANG LEBAR SISI
(M2) (UNIT) (M2) X PAKAI

Bekisting Memanjang 204.00 0.70 1.00 142.80 1.00 142.80 142.80

JUMLAH : 142.80
BETON
JUMLAH BIAS VOLUME VOL.
KETERANGAN PANJANG LEBAR TINGGI
(M2) (UNIT) (M3) BETON

Beton Memanjang 204.00 0.20 0.25 10.20 1.00 10.20 10.20

JUMLAH : 10.20
Ring Balok 13/20 RB2
BESI
DIMENSIONS BJ PANJANG BATANG JUMLAH BIAS TOTAL VOL.
KETERANGAN Ø BESI
PREVIEW (Kg/M1) (M1) (Bh) (M1) (UNIT) (M1) Kg

Besi Memanjang ( Polos ) 12.00 0.89 280.00 4.00 1,120.00 1.00 1,120.00 996.80
Besi Begel ( Polos ) 8.00 0.39 0.54 2,240.00 1,209.60 1.00 1,209.60 471.74 #REF!

JUMLAH : 1,468.54
BEKISTING
JUMLAH BIAS VOLUME VOL.
KETERANGAN PANJANG LEBAR SISI
(M2) (UNIT) (M2) X PAKAI

Bekisting Memanjang 280.00 0.40 1.00 112.00 1.00 112.00 112.00

JUMLAH : 112.00
BETON
JUMLAH BIAS VOLUME VOL.
KETERANGAN PANJANG LEBAR TINGGI
(M2) (UNIT) (M3) BETON

Beton Memanjang 280.00 0.20 0.13 7.28 1.00 7.28 7.28

JUMLAH : 7.28
Dengan perangkat tambahan :
BESI
DIMENSIONS BJ PANJANG BATANG JUMLAH BIAS TOTAL VOL.
KETERANGAN BESI
PREVIEW (Kg/M1) (M1) (Bh)- balok (M1) (UNIT) (M1) Kg
Besi Memanjang (polos) Ø 10.00 0.62 22.15 8.00 177.20 2.00 354.40 219.73
Besi Melintang (polos) Ø 10.00 0.62 1.00 202.00 202.00 2.00 404.00 250.48
BESI UTAMA Besi Memanjang (polos) Ø 10.00 0.62 26.15 8.00 209.20 2.00 418.40 259.41
Besi Melintang (polos) Ø 10.00 0.62 1.00 242.00 242.00 2.00 484.00 300.08
JUMLAH : 1,029.70
BEKISTING
JUMLAH BIAS VOLUME VOL.
KETERANGAN PANJANG LEBAR SISI
(M2) (UNIT) (M2)
Bekisting 22.00 0.80 1.00 17.60 2.00 35.20 35.20
Bekisting 26.00 0.80 1.00 20.80 2.00 41.60 41.60
JUMLAH : 76.80
BETON
JUMLAH BIAS VOLUME VOL.
KETERANGAN PANJANG LEBAR TINGGI
(M2) (UNIT) (M3) BETON
Beton Bertulang 22.00 0.80 0.12 2.11 2.00 4.22 4.22
Beton Bertulang 0.80 0.12 - 10.00 - -
Beton Bertulang 26.00 0.80 0.12 2.50 2.00 4.99 4.99
Beton Bertulang - 0.80 0.12 - 10.00 - -
Beton Bertulang
Beton Bertulang
Beton Bertulang
Beton Bertulang
Beton Bertulang
JUMLAH : 9.22
( 2 x 80 x 220) . Dengan perangkat tambahan :
BESI
DIMENSIONS BJ PANJANG BATANG JUMLAH BIAS TOTAL VOL.
KETERANGAN Ø BESI
PREVIEW (Kg/M1) (M1) (Bh) (M1) (UNIT) (M1) Kg

Besi Memanjang ( Polos ) 12.00 0.89 0.80 2.00 1.60 38.00 60.80 54.11
Besi Begel ( Polos ) 8.00 0.39 0.40 4.00 1.60 38.00 60.80 23.71 #REF!

JUMLAH : 77.82
BEKISTING
JUMLAH BIAS VOLUME VOL.
KETERANGAN PANJANG LEBAR SISI
(M2) (UNIT) (M2) X PAKAI

Bekisting Memanjang 0.80 0.40 1.00 0.32 38.00 12.16 12.16

JUMLAH : 12.16
BETON
JUMLAH BIAS VOLUME VOL.
KETERANGAN PANJANG LEBAR TINGGI
(M2) (UNIT) (M3) BETON

Beton Memanjang 0.80 0.40 0.07 0.02 38.00 0.85 0.85

JUMLAH : 0.85
Top Gevel 13/15
BESI
DIMENSIONS BJ PANJANG BATANG JUMLAH BIAS TOTAL VOL.
KETERANGAN Ø BESI
PREVIEW (Kg/M1) (M1) (Bh) (M1) (UNIT) (M1) Kg

Besi Memanjang 10.00 0.62 136.00 4.00 544.00 1.00 544.00 337.28
Besi Begel 6.00 0.22 0.46 907.00 417.22 1.00 417.22 91.79

JUMLAH : 429.07
BEKISTING
JUMLAH BIAS VOLUME VOL.
KETERANGAN TINGGI LEBAR SISI
(M2) (UNIT) (M2) X PAKAI

Bekisting 136.00 0.15 2.00 40.80 1.00 40.80 20.40

JUMLAH : 20.40
BETON
JUMLAH BIAS VOLUME VOL.
KETERANGAN PANJANG LEBAR TINGGI
(M2) (UNIT) (M3) BETON

Beton Bertulang 136.00 0.15 0.13 2.65 1.00 2.65 2.65


JUMLAH : 2.65

Anda mungkin juga menyukai