BELAKANG
LEMBAR
03
1 3 5 6
800
222 265 300
I I
RG. MENCUCI
251
251
-0.05
DAPUR
TAMAN ±0.00
-0.35
H H
K. TIDUR ANAK
±0.00
PEKERJAAN
RG. KELUARGA
300
300
±0.00 B
LEMBAR
5
LOKASI
G G
WC/KM DIBUAT
-0.05
132
F
318
WC/KM
1500
1500
RG. TAMU
132
-0.05
±0.00
-
KIRI
LEMBAR
04
E KANAN
LEMBAR
04
TIM-A STUDIO
D DIPERIKSA
120
274
-0.05 ±0.00
C
-
B CV. MARHOMY UTAMA ABADI
KONSULTAN PERENCANA
504
RG. STAF
+0.040
404
RU
A A
GAMBAR SKALA
A
LEMBAR DENAH 1:75
5
1 2 4 6 DENAH
SKALA : 1:75
-
800
222 265 300
251
251
PEKERJAAN
300
300
LOKASI
DIBUAT
132
318
1500
1500
132
-
TIM-A STUDIO
DIPERIKSA
120
274
-
CV. MARHOMY UTAMA ABADI
KONSULTAN PERENCANA
504
404
RU
GAMBAR SKALA
TAMPAK ATAS 1:75
TAMPAK ATAS
SKALA : 1:75
-
02 14
KETERANGAN
PEKERJAAN
LOKASI
DIBUAT
TAMPAK DEPAN
SKALA : 1:75
-
-
TIM-A STUDIO
DIPERIKSA
-
CV. MARHOMY UTAMA ABADI
KONSULTAN PERENCANA
RU
GAMBAR SKALA
TAMPAK DEPAN 1:75
TAMPAK BELAKANG 1:75
TAMPAK BELAKANG
SKALA : 1:75
-
03 14
KETERANGAN
PEKERJAAN
LOKASI
DIBUAT
TAMPAK KANAN
SKALA : 1:75
-
-
TIM-A STUDIO
DIPERIKSA
-
CV. MARHOMY UTAMA ABADI
KONSULTAN PERENCANA
RU
GAMBAR SKALA
TAMPAK KANAN 1:75
TAMPAK KIRI 1:75
TAMPAK KIRI
SKALA : 1:75
-
04 14
KETERANGAN
SPANDEK 0.30
KANAL C 75.75
+05.84
TALANG BETON
+04.50
RINGBALK 15/20
PEKERJAAN
SLOOF 15/20
-00.55
LOKASI
-00.55
-01.03
DIBUAT
POTONGAN A-A
SKALA : 1:75
-
-
TIM-A STUDIO
+06.67 SPANDEK 0.30
DIPERIKSA
KANAL C 75.75
TALANG BETON
+04.50 -
CV. MARHOMY UTAMA ABADI
RINGBALK 15/20 RINGBALK 15/20
KONSULTAN PERENCANA
+03.70
PLAFOND PLAFOND
+03.70 +03.70
RU
0
SLOOF 15/20
-00.55
GAMBAR SKALA
-00.55 TAMPAK KANAN 1:75
TAMPAK KIRI 1:75
-01.03
1 3 5 6
800
222 265 300
TEMPAT TANDON
I I
251
251
H H
300
300
PEKERJAAN
KANAL C 75.75
LOKASI
G G
DIBUAT
132
318 F
1500
1500
132
E -
TIM-A STUDIO
D TALANG BETON
DIPERIKSA
120
274
C LISPLANG 20CM
B -
CV. MARHOMY UTAMA ABADI
KONSULTAN PERENCANA
504
404
RU
A A
GAMBAR SKALA
DENAH 1:75
1 2 4 6
RENCANA ATAP
SKALA : 1:75
- TANGGAL NO. LBR. JML. LBR.
06 14
KETERANGAN
10
0
10
0 KANAL C 75.75
49
TALANG BETON
PEKERJAAN
LOKASI
RINGBALK 15/20
DIBUAT
385 262
DETAIL ATAP
SKALA : 1:30
- -
TIM-A STUDIO
DIPERIKSA
-
AIR HUJAN
CV. MARHOMY UTAMA ABADI
KONSULTAN PERENCANA
15
RU
30
0
20
07 14
KETERANGAN
1 3 5 6
800
222 265 300
I I
251
251
H H
P1
LEMBAR
1 PEKERJAAN
300
300
LOKASI
G G
DIBUAT
132
F
318
1500
1500
132
P2
LEMBAR
1 -
E TIM-A STUDIO
D DIPERIKSA
120
274
C
-
B CV. MARHOMY UTAMA ABADI
KONSULTAN PERENCANA
504
404
RU
A A
GAMBAR SKALA
DENAH 1:75
1 2 4 6 RENCANA PONDASI
SKALA : 1:75
-
08 14
KETERANGAN
13
13
PEKERJAAN
KERAMIK 40X40
20
RABAT BETON
20
5 21
5 21
20
12
DINDING TRASRAM
DIBUAT
20
12
PASIR URUG 15
30
SLOOF 15/20
PASIR URUG 15
43
32
43
23
TANAH URUG TANAH URUG
-
TIM-A STUDIO
48
80 DIPERIKSA
PONDASI BATU KALI PONDASI BATU KALI
48
10
90
-
CV. MARHOMY UTAMA ABADI
53
KONSULTAN PERENCANA
DETAIL P1 DETAIL P2
SKALA : 1:20
- SKALA : 1:20
-
RU
GAMBAR SKALA
DENAH 1:75
09 14
KETERANGAN
1 3 5 6
800
222 265 300
I I
251
251
H H
300
300
PEKERJAAN
LOKASI
G G
DIBUAT
132
F
318
1500
1500
132
E -
TIM-A STUDIO
D DIPERIKSA
120
274
C
B -
CV. MARHOMY UTAMA ABADI
KONSULTAN PERENCANA
504
404
RU
A A
GAMBAR SKALA
DENAH 1:75
1 2 4 6 RENCANA LANTAI
SKALA : 1:75
-
10 14
KETERANGAN
1 3 5 6
800
222 265 300
I I
251
251
H H
300
300
PEKERJAAN
LOKASI
G G
132
DIBUAT
318
1500
1500
KETERANGAN
132
E
POMPA AIR -
D TIM-A STUDIO
SALURAN AIR BERSIH DIPERIKSA
120
274
DISPOSAL CAIR
C
DISPOSAL PADAT
KRAN AIR B
-
CV. MARHOMY UTAMA ABADI
FLOOR DRAIN KONSULTAN PERENCANA
504
SEPTICTANK
404
SEPTICK TANK
BAK PERESAPAN
RU
0
A A
GAMBAR SKALA
1 2 4 6 DENAH 1:75
RENCANA ATAP
SKALA : 1:75
- TANGGAL NO. LBR. JML. LBR.
11 14
1 3 5 6 KETERANGAN
800
222 265 300
I I
251
251
H H
300
300
P3 P1
PEKERJAAN
G G LOKASI
P2
132
F DIBUAT
318
1500
1500
132
PJ1 P1
E
D P2
-
TIM-A STUDIO
120
274
DIPERIKSA
C
J1
B
-
CV. MARHOMY UTAMA ABADI
KONSULTAN PERENCANA
504
404
RU
0
A A
1 2 4 6 GAMBAR SKALA
DENAH 1:75
RENCANA KUSEN
SKALA : 1:75
-
TANGGAL NO. LBR. JML. LBR.
12 14
KETERANGAN
155.0 90.0
13.0 13.0
5.0 5.0
6.0 6.0
38.0
38.0
50.0
50.0
116.5
6.0
6.0 6.0
205.0
130.5
265.0
215.0
215.0
203.0
39.5
39.5
90.0 5.0 7.0 7.0 5.0 7.0 7.0 5.0 80.0 5.0
6.0
6.0 38.0 6.0
100.0
PEKERJAAN
13.0
LOKASI
DETAIL PINTU 1
SKALA : 1:50
-
DIBUAT
-
TIM-A STUDIO
DIPERIKSA
13.0 13.0
5.0 5.0
68.0
10.0
13.0
4.0 3.0
70.0
78.0
78.0
13.0 5.0
5.0
-
CV. MARHOMY UTAMA ABADI
205.0
205.0
205.0
205.0
200.0
200.0
40.0
KONSULTAN PERENCANA
6.0
38.0
180.0
170.0
180.0
6.0
25.0
5.0
70.0
3.0 3.0
5.0
5.0
5.0
RU
DETAIL JENDELA
SKALA : 1:50
-
DETAIL PINTU 2 DETAIL PINTU 3
SKALA : 1:50
- SKALA : 1:50
-
GAMBAR SKALA
DENAH 1:75
13 14
KETERANGAN
1 3 5 6
800
222 265 300
I I
251
251
H H
PEKERJAAN
300
300
P1
LOKASI
G G DIBUAT
132
F
318
1500
1500
132
-
E TIM-A STUDIO
D DIPERIKSA
KETERANGAN JUMLAH
120
274
Kabel Listrik
C
Lampu Downlight 10
-
Saklar Ganda 2
Saklar Tunggal 5
B CV. MARHOMY UTAMA ABADI
KONSULTAN PERENCANA
Stop Kontak 7
504
404
RU
A A
GAMBAR SKALA
DENAH 1:75
1 2 4 6
RENCANA ELEKTRIKAL TANGGAL NO. LBR. JML. LBR.
SKALA : 1:75
-
14 14