Anda di halaman 1dari 1

KONSULTAN PENGAWAS

PEMBANGUNAN JALAN TOL


KONTRAKTOR PELAKSANA
PT. WASKITA KARYA (Persero), Tbk
KAYU AGUNG - PALEMBANG -BETUNG
PAKET.1 - SEKSI.1A (STA.0+000 - STA.9+000)

No. Bab : 4 No. Item : 4.05 (1) Data : Kuantitas Akhir


Nama Bab : PEKERJAAN TANAH Nama Item : Borrow Material untuk Timbunan PERHITUNGAN LUAS PENAMPANG LEMBAR : dari

STA. 1+250,00
12

10,220

10,123
10,117
9,994

9,994
10

8,101

8,101
8,110

8,110
7,267

7,267
8

7,223

7,223 7,223
6

5,794

5,594
4

4,067

3,923

3,923
2

0
-34 -32 -30 -28 -26 -24 -22 -20 -18 -16 -14 -12 -10 -8 -6 -4 -2 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34

-2

ELEVASI AKTUAL 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40
JARAK (19,454) (14,839) (14,609) (10,840) (6,000) - 6,000 10,840 14,609 14,839 19,855
SUBGRADE
ELEVASI 5,794 8,101 8,110 9,994 10,117 10,220 10,123 9,994 8,110 8,101 5,594
ESTIMASI JARAK -19,454 -30,000 19,855 30,000
DASAR RAWA ELEVASI 5,794 5,794 5,594 5,594
JARAK (6,000) 6,000
TOP AC-WC
ELEVASI 10,817 10,823
AKTUAL JARAK 16,596 6,000 (6,000) (16,508)
PLATFORM ELEVASI 7,223 7,223 7,266 7,266
GARIS JARAK (13,42) 12,710
ASAOKA ELEVASI 4,63 4,318
AKTUAL GEOTEX JARAK (6,000) 6,000
WOVEN ELEVASI 4,067 3,923

NO 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43
JARAK ( X ) 16,60 6,00 -6,000 -16,508 -19,454 -10,500 -6,000 6,000 10,500 19,855 16,596
Volume Timbunan platform
ELEVASI ( Y ) 7,223 7,223 7,267 7,267 5,794 4,067 4,067 3,923 3,923 5,594 7,223
Δ (Y1*X2) - 1 119,9 43,6 (43,6) (95,6) (79,1) (42,7) (23,5) 23,5 58,7 143,4 - - - - - - - - - - - - - - - - - - - - - - - - - - 104,55
(1-2)/2 107,402
Δ (X1*Y2) - 2 43,3 (43,3) (120,0) (141,4) (60,8) (24,4) 24,4 41,2 77,9 92,8 - - - - - - - - - - - - - - - - - - - - - - - - - - (110,252)
NO 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43
JARAK ( X ) 10,840 6,000 0,000 -6,000 -10,840 -14,609 -14,839 -16,508 -6,000 6,000 16,596 14,839 14,609 10,840
Volume Timbunan Borrow
ELEVASI ( Y ) 9,994 10,123 10,220 10,117 9,994 8,110 8,101 7,267 7,267 7,223 7,223 8,101 8,110 9,994
Δ (Y1*X2) - 1 109,7 61,3 - (60,0) (87,9) (118,3) (107,8) (120,0) (43,3) 43,3 134,4 120,3 146,0 - - - - - - - - - - - - - - - - - - - - - - - 77,82
(1-2)/2 77,804
Δ (X1*Y2) - 2 60,0 - (61,3) (109,7) (146,0) (120,3) (133,7) (43,6) 43,6 119,9 107,2 118,3 87,9 - - - - - - - - - - - - - - - - - - - - - - - (77,787)

Disetujui oleh ; Diperiksa oleh ; Dibuat dan Diajukan oleh ;


PEMILIK PROYEK KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA

Susanto Fendi Wijaya Elan Agustiawan Irwan


Asst.Quantity Engineer Quantity Survey Quantity Survey