Harga Satuan Jumlah

No Uraian Pekerjaan Volume Satuan Nama Merk Dagang


Rp Rp

PEKERJAAN MEKANIKAL, ELEKTRIKAL DAN PLUMBING


A PIPA SPARING DI SITE
SPARING DARI TRAFO KE LVMDP PIPA
Pengadaan dan pemasangan pipa sparing di Siteplan
Pipa PVC klas AW (10 kg/cm2). Termasuk
fiting, tee, elbow, reducer dll
• PVC AW ø 250 mm 200.00 m 693,300.00 138,660,000.00 Wavin atau setara
SPARING DARI TRAFO KE GAS MEDIS
Pengadaan dan pemasangan pipa sparing di Siteplan
Pipa PVC klas AW (10 kg/cm2). Termasuk
fiting, tee, elbow, reducer dll
• PVC AW ø 250 mm 150.00 m 693,300.00 103,995,000.00 Wavin atau setara
SPARING DARI LVMDP KE DALAM GEDUNG
Pengadaan dan pemasangan pipa sparing di Siteplan
Pipa PVC klas AW (10 kg/cm2). Termasuk
fiting, tee, elbow, reducer dll
• PVC AW ø 250 mm 150.00 m 693,300.00 103,995,000.00 Wavin atau setara
SUB TOTAL SPARING DI SITE
E PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
E.I PENYEDIAAN DAYA LISTRIK DAN PENYAMBUNGAN DAYA PLN
Pengadaan dan pemasangan kubikel tegangan menengah, kabel TM, transformator step down,
ring pentanahan di ruangan, box pentanahan danbatang pentanahan.
1 Panel TM Incoming (IM) LBS 630A 2.00 bh 59,597,860.00 119,195,720.00 Schneider atau setara
2 Panel TM Outgoing (QM) LBS 630A 2.00 bh 59,597,860.00 119,195,720.00 Schneider atau setara
3 Kabel TM N2SXY 3 x 240 mm2 dari Gardu PLN ke panel TM 300.00 m 498,990.00 149,697,000.00 Standard LMK
4 Transformator 3000 kVA, lengkap dengan terminasi, 1.00 unit 425,050,550.00 425,050,550.00 Unindo atau setara
DGPT2 terhubung ke shunt trip panel TM, dan kelengkapannya
5 Transformator 1250 kVA, lengkap dengan terminasi, 1.00 unit 324,990,210.00 324,990,210.00 Unindo atau setara
DGPT2 terhubung ke shunt trip panel TM, dan kelengkapannya
6 Kabel TM N2SXY 3 x 240 mm2 dari Panel TM ke 56.00 m 498,990.00 27,943,440.00 Standard LMK
tranformator
7 Pentanahan trafo, LV-MDP dan ruang trafo dengan 2.00 unit 11,968,320.00 23,936,640.00 -
dengan ring BCC 50 mm2, diklem ke dinding, keliling
ruangan. Box grounding dan batang tembaga pentanahan
8 Pipa sparing kabel TM, tangga kabel vertikal, dan peralatan 2.00 ls 1,056,470.00 2,112,940.00 -
bantu pemasangan dan penyambungan kabel TM
9 Beaya penyambungan (BP) dan Uang jaminan 4,000.00 kVA 1,098,430.00 4,393,720,000.00 -
langganan (UJL) untuk 4000 kVA
10 Beaya pengadaan gardu PLN berikut peralatan 1.00 lot 3,366,114,120.00 3,366,114,120.00 -
dan kabel instalasi
11 Kabel TM N2SXGbY 3 x 240 mm2 to Gardu PLN 500.00 m 498,990.00 249,495,000.00 Standard LMK
SUB TOTALPENYAMBUNGAN DAYA PLN
E.2 PEKERJAAN ELEKTRIKAL
I PENYEDIAAN DAYA LISTRIK
Pengadaan panel LPMDP lengkap dengan metering dan kabel kontrol dan grounding sesui disain rencana
lantai 1
Pengadaan panel LPMDP lengkap dengan metering dan kabel kontrol dan lain sesuai disain rencana
1 Panel LV-MDP + CAPACITOR BANK 1.000 KVAR 2.00 unit 334,412,540.00 668,825,080.00 Schneider atau setara
2 Panel LV-MDP + CAPACITOR BANK 1.000 KVAR
3 Panel PP penerangan dan stop kontak 1.00 unit 20,138,220.00 20,138,220.00 -
4 Panel AC INDOOR 1.00 unit 32,167,120.00 32,167,120.00 -
5 Panel UPS 1.00 unit 23,007,840.00 23,007,840.00 -
6 Panel FLUOROSKOPI 1.00 unit 32,167,120.00 32,167,120.00 -
7 Panel PANORAMIK 1.00 unit 32,167,120.00 32,167,120.00 -
8 Panel X-RAY 1.00 unit 32,167,120.00 32,167,120.00 -
9 Panel CT-SCAN 1.00 unit 32,167,120.00 32,167,120.00 -
10 Panel USG 1.00 unit 32,167,120.00 32,167,120.00 -
11 Panel MRI 1.00 unit 32,167,120.00 32,167,120.00 -
12 Panel OK LANTAI 1 1.00 unit 22,932,710.00 22,932,710.00 -

lantai 2
1 Panel PP penerangan dan stop kontak 1.00 unit 20,138,220.00 20,138,220.00 -
2 Panel AC INDOOR 1.00 unit 31,995,860.00 31,995,860.00 -
3 Panel UPS 1.00 unit 23,291,950.00 23,291,950.00 -

LANTAI 3
1 Panel PP penerangan dan stop kontak 1.00 unit 20,138,220.00 20,138,220.00 -
2 Panel AC INDOOR 1.00 unit 32,282,390.00 32,282,390.00 -
3 Panel UPS 1.00 unit 23,190,990.00 23,190,990.00 -
4 Panel RUANG OK 1 LT.3 1.00 unit 20,138,220.00 20,138,220.00 -
5 Panel RUANG OK 2 LT.3 1.00 unit 20,138,220.00 20,138,220.00 -
6 Panel RUANG OK 3 LT.3 1.00 unit 20,138,220.00 20,138,220.00 -
7 Panel RUANG OK 4 LT.4 1.00 unit 20,138,220.00 20,138,220.00 -
8 Panel RUANG OK 5 LT.4 1.00 unit 20,138,220.00 20,138,220.00 -
9 Panel RUANG OK 6 LT.5 1.00 unit 20,138,220.00 20,138,220.00 -

LANTAI 4
1 Panel PP penerangan dan stop kontak 1.00 unit 20,138,220.00 20,138,220.00 -
2 Panel AC INDOOR 1.00 unit 32,282,390.00 32,282,390.00 -
3 Panel UPS 1.00 unit 20,138,220.00 20,138,220.00 -

LANTAI 5
1 Panel PP penerangan dan stop kontak 1.00 unit 32,282,390.00 32,282,390.00 -
2 Panel AC INDOOR 1.00 unit 20,138,220.00 20,138,220.00 -
3 Panel UPS 1.00 unit 20,138,220.00 20,138,220.00 -

LANTAI 6
1 Panel PP penerangan dan stop kontak 1.00 unit 20,138,220.00 20,138,220.00 -
2 Panel AC INDOOR 1.00 unit 32,282,390.00 32,282,390.00 -
3 Panel UPS 1.00 unit 20,138,220.00 20,138,220.00 -

LANTAI 7
1 Panel PP penerangan dan stop kontak 1.00 unit 20,138,220.00 20,138,220.00 -
2 Panel AC INDOOR 1.00 unit 32,282,390.00 32,282,390.00 -
3 Panel UPS 1.00 unit 20,138,220.00 20,138,220.00 -

LANTAI atap
1 Panel PP penerangan dan stop kontak 1.00 unit 20,138,220.00 20,138,220.00 -
2 Panel AC OUTDOOR 1 1.00 unit 76,480,140.00 76,480,140.00 -
3 Panel AC OUTDOOR 2 1.00 unit 76,480,140.00 76,480,140.00 -
3 Panel AC INDOOR 1.00 unit 32,282,390.00 32,282,390.00 -
4 Panel UPS 1.00 unit 20,138,220.00 20,138,220.00 -
5 Panel CHILLER 1.00 unit 76,480,140.00 76,480,140.00 -
6 Panel PRESS FAN 1.00 unit 32,282,390.00 32,282,390.00 -
7 Panel POMPA ATAP 1.00 unit 32,282,390.00 32,282,390.00 -

Site Plant Area


1 Panel pompa air bersih RWT sand filter dan carbon filter 1.00 unit 20,138,220.00 20,138,220.00 -
2 panel pompa Transfer dan kontrol WLC 1.00 unit 20,138,220.00 20,138,220.00 -
3 Panel pompa hydrant (elektrik pump) 1.00 unit 123,712,100.00 123,712,100.00 -
4 Panel STP (limbah) 1.00 unit 20,138,220.00 20,138,220.00 -
5 Panel lift pasenger 2.00 unit 20,138,220.00 40,276,440.00 -
6 Panel lift service 1.00 unit 20,138,220.00 20,138,220.00 -
7 Panel power peunumetik tube 1.00 unit 20,138,220.00 20,138,220.00 -
9 Panel kontrol management building ( cctv saund system fire alaram dan lain 1.00 unit 20,138,220.00 20,138,220.00 -
10 panel tiketing dan pos jaga 1.00 unit 20,138,220.00 20,138,220.00 -
11 panel power pompa sumpit 4.00 unit 20,138,220.00 80,552,880.00 -
12 panel power bilboard 1.00 unit 20,138,220.00 20,138,220.00 -
13 Panel kontrol gas Medis 2.00 unit 20,138,220.00 40,276,440.00 -
SUB. TOTAL .I PENYEDIAAN DAYA LISTRIK
II KABEL DAYA UTAMA
Pengadaan dan pemasangan kabel listrik tegangan rendah, pengujian, termasuk peralatan bantu,
kabel ties, pelindung kabel, penggalian jalur kabel, bobokan tembok dan perapihan kembali.
1 Transformator ke LV-MDP-1
9 x NYY 4x300mm² + NYA 150 mm² 50.00 meter 21,167,680.00 1,058,384,000.00 Standard LMK
2 Transformator ke LV-MDP-2
4 x NYY 4x300mm² + NYA 150 mm² 50.00 meter 9,417,330.00 470,866,500.00 Standard LMK
3 Panel Kontrol Genset ke LV-MDP 1 LENGKAP DENGAN KABEK KONTROL
9 x NYY 4x300mm² + NYA 150 mm² 50.00 meter 21,118,610.00 1,055,930,500.00 Standard LMK
4 Panel Kontrol Genset ke LV-MDP 2 LENGKAP DENGAN KABEK KONTROL
4 x NYY 4x300mm² + NYA 150 mm² 50.00 meter 9,381,310.00 469,065,500.00 Standard LMK

Panel LV-MDP 1 ke
LANTAI 1
Panel PP penerangan dan stop kontak NYY 4 X 35 MM + BC 16 MM 55.00 meter 291,780.00 16,047,900.00 -
Panel AC INDOOR NYY 4 X 4mm + BC 4 mm 55.00 meter 55,050.00 3,027,750.00 -
Panel UPS NYY 4 X 35 mm + BC 16 mm 55.00 meter 294,630.00 16,204,650.00 -
Panel FLUOROSKOPI NYY 4 X 240 mm + BC 95 mm 55.00 meter 1,855,530.00 102,054,150.00 -
Panel PANORAMIK NYY 4 X 240 mm + BC 95 mm 55.00 meter 1,855,530.00 102,054,150.00 -
Panel X-RAY NYY 4 X 240 mm + BC 95 mm 55.00 meter 1,855,530.00 102,054,150.00 -
Panel CT-SCAN NYY 4 X 240 mm + BC 95 mm 55.00 meter 1,855,530.00 102,054,150.00 -
Panel USG NYY 4 X 240 mm + BC 95 mm 55.00 meter 1,855,530.00 102,054,150.00 -
Panel MRI NYY 4 X 240 mm + BC 95 mm 55.00 meter 1,855,530.00 102,054,150.00 -
Panel OK LANTAI 1 NYY 4 X 6 mm + BC 4 mm 55.00 meter 69,970.00 3,848,350.00 -

lantai 2
Panel PP penerangan dan stop kontak NYY 4 X 35 MM + BC 16 MM 65.00 meter 291,780.00 18,965,700.00 -
Panel AC INDOOR NYY 4 X 4mm + BC 4 mm 65.00 meter 55,050.00 3,578,250.00 -
Panel UPS NYY 4 X 35 mm + BC 16 mm 65.00 meter 294,630.00 19,150,950.00 -

lantai 3
Panel PP penerangan dan stop kontak NYY 4 X 35 MM + BC 16 MM 80.00 meter 291,780.00 23,342,400.00 -
Panel AC INDOOR NYY 4 X 4mm + BC 4 mm 80.00 meter 55,050.00 4,404,000.00 -
Panel UPS NYY 4 X 35 mm + BC 16 mm 80.00 meter 294,630.00 23,570,400.00 -
Panel RUANG OK 1 LT.3 NYY 4 X 25mm+ 10mm 80.00 meter 219,880.00 17,590,400.00 -
Panel RUANG OK 2 LT.3 NYY 4 X 25mm+ 10mm 80.00 meter 219,880.00 17,590,400.00 -
Panel RUANG OK 3 LT.3 NYY 4 X 25mm+ 10mm 80.00 meter 219,880.00 17,590,400.00 -
Panel RUANG OK 4 LT.3 NYY 4 X 25mm+ 10mm 80.00 meter 219,880.00 17,590,400.00 -
Panel RUANG OK 5 LT.3 NYY 4 X 25mm+ 10mm 80.00 meter 219,880.00 17,590,400.00 -
Panel RUANG OK 6 LT.3 NYY 4 X 25mm+ 10mm 80.00 meter 219,880.00 17,590,400.00 -

Panel LV-MDP 2 ke
lantai 4
Panel PP penerangan dan stop kontak NYY 4 X 35 MM + BC 16 MM 95.00 meter 291,780.00 27,719,100.00 -
Panel AC INDOOR NYY 4 X 4mm + BC 4 mm 95.00 meter 55,050.00 5,229,750.00 -
Panel UPS NYY 4 X 35 mm + BC 16 mm 95.00 meter 294,630.00 27,989,850.00 -

lantai 5
Panel PP penerangan dan stop kontak NYY 4 X 35 MM + BC 16 MM 105.00 meter 291,780.00 30,636,900.00 -
Panel AC INDOOR NYY 4 X 4mm + BC 4 mm 105.00 meter 55,050.00 5,780,250.00 -
Panel UPS NYY 4 X 35 mm + BC 16 mm 105.00 meter 294,630.00 30,936,150.00 -

lantai 6
Panel PP penerangan dan stop kontak NYY 4 X 35 MM + BC 16 MM 125.00 meter 291,780.00 36,472,500.00 -
Panel AC INDOOR NYY 4 X 4mm + BC 4 mm 125.00 meter 55,050.00 6,881,250.00 -
Panel UPS NYY 4 X 35 mm + BC 16 mm 125.00 meter 294,630.00 36,828,750.00 -

lantai 7
Panel PP penerangan dan stop kontak NYY 4 X 35 MM + BC 16 MM 145.00 meter 291,780.00 42,308,100.00 -
Panel AC INDOOR NYY 4 X 4mm + BC 4 mm 145.00 meter 55,050.00 7,982,250.00 -
Panel UPS NYY 4 X 35 mm + BC 16 mm 145.00 meter 294,630.00 42,721,350.00 -

LANTAI atap
Panel PP penerangan dan stop kontak NYY 4 X 35 MM + BC 16 MM 155.00 meter 291,780.00 45,225,900.00 -
Panel AC OUTDOOR 1 NYY 4 X 240 MM+ BC 95 MM2 155.00 meter 1,855,530.00 287,607,150.00 -
Panel AC OUTDOOR 2 NYY 4 X 300 MM+ BC 95 MM2 155.00 meter 2,296,500.00 355,957,500.00 -
Panel AC INDOOR NYY 4 X 4mm + BC 4 mm 155.00 meter 55,050.00 8,532,750.00 -
Panel UPS NYY 4 X 35 mm + BC 16 mm 155.00 meter 291,780.00 45,225,900.00 -
Panel CHILLER NYY 2(4 X 300 MM+ BC 95 MM2) 155.00 meter 4,597,260.00 712,575,300.00 -
Panel PRESS FAN FRC 4 X 35 MM+ BC 16 MM2) 155.00 meter 350,820.00 54,377,100.00 -
Panel POMPA ATAP NYY 4 X 35 MM + BC 16 MM 155.00 meter 291,780.00 45,225,900.00 -

Site Plant Area


Panel pompa air bersih RWT sand filter dan carbon filter NYY 4 x 10 mm+16 mm 55.00 meter 99,790.00 5,488,450.00 -
panel pompa Transfer dan kontrol WLC NYY 4 x 10 +16 mm 56.00 meter 99,790.00 5,588,240.00 -
Panel pompa hydrant (elektrik pump) FRC 4 x 185+ 70mm 56.00 meter 1,749,810.00 97,989,360.00 -
Panel STP (limbah) NYY 4 x 16mm + 10mm 120.00 meter 150,130.00 18,015,600.00 -
Panel lift pasenger FRC 4 x 35mm+ 16mm 126.00 meter 350,820.00 44,203,320.00 -
Panel lift service FRC 4 x 35 +16 mm 126.00 meter 350,820.00 44,203,320.00 -
Panel power peunumetik tube NYY 4 x 10+ 4mm 56.00 meter 100,680.00 5,638,080.00 -
Panel kontrol management building ( cctv saund system fire alaram dan lain NYY 4 x 16+ 10 mm 56.00 meter 150,130.00 8,407,280.00 -
panel tiketing dan pos jaga NYY 4 x 4 + 4mm 95.00 meter 55,050.00 5,229,750.00 -
panel power pompa sumpit NYY 4 x 4 +4mm 103.00 meter 55,050.00 5,670,150.00 -
panel power bilboard NYY 4 x 10 + 4mm 120.00 meter 100,680.00 12,081,600.00 -
Panel kontrol gas Medis NYY 4 X 10+ 4mm 135.00 meter 100,680.00 13,591,800.00 -
SUB. TOTAL II PEKERJAAN KABEL DAYA UTAMA
III KABEL LADDER DAN KABEL TRAY
KABEL LADDER
• Kabel Ladder L = 40 cm, arus kuat, Vertikal 70.00 meter 284,370.00 19,905,900.00 electro atau setara
• Kabel Ladder L = 40 cm, arus lemah, Vertikal 70.00 meter 284,370.00 19,905,900.00 electro atau setara
• Kabel Ladder L = 60 cm, R..Genset & R. Trafo 70.00 meter 391,320.00 27,392,400.00 electro atau setara
• Kabel Ladder L = 80 cm, R..Genset & R. Trafo 70.00 meter 465,790.00 32,605,300.00 electro atau setara
Tray ledder dlam sharf vertikal sampai lantai atap
• Kabel Ladder L =60 cm, 35.00 meter 391,320.00 13,696,200.00 electro atau setara
• Kabel Ladder L = 30 cm 35.00 meter 249,750.00 8,741,250.00 electro atau setara
KABEL TRAY
ARUS KUAT
Lantai 1 - Arus Kuat
• Kabel Tray L = 60 cm 90.00 meter 344,230.00 30,980,700.00 electro atau setara
Lantai 2 - Arus Kuat
• Kabel Tray L = 30 cm 90.00 meter 344,230.00 30,980,700.00 electro atau setara
Lantai 3 - Arus Kuat
• Kabel Tray L = 30 cm 90.00 meter 344,230.00 30,980,700.00 electro atau setara
Lantai 4- Arus Kuat
• Kabel Tray L = 30 cm 90.00 meter 344,230.00 30,980,700.00 electro atau setara
Lantai 5 - Arus Kuat
• Kabel Tray L = 30 cm 180.00 meter 344,230.00 61,961,400.00 electro atau setara
Lantai 6 - Arus Kuat

• Kabel Tray L = 30 cm 180.00 meter 344,230.00 61,961,400.00 electro atau setara


Lantai 7- Arus Kuat
• Kabel Tray L = 30 cm 180.00 meter 344,230.00 61,961,400.00 electro atau setara
Lantai Atap - Arus Kuat
• Kabel Tray L = 30 cm 80.00 meter 344,230.00 27,538,400.00 electro atau setara

ARUS LEMAH
Lantai 1 - Arus Lemah
• Kabel Tray L = 30 cm 90.00 meter 205,620.00 18,505,800.00 electro atau setara
Lantai 2 - Arus Lemah
• Kabel Tray L = 30 cm 90.00 meter 205,620.00 18,505,800.00 electro atau setara
Lantai 3 - Arus Lemah
• Kabel Tray L = 30 cm 90.00 meter 205,620.00 18,505,800.00 electro atau setara
Lantai 4 - Arus Lemah
• Kabel Tray L = 30 cm 90.00 meter 205,620.00 18,505,800.00 electro atau setara
Lantai 5 - Arus Lemah
• Kabel Tray L = 30 cm 180.00 meter 205,620.00 37,011,600.00 electro atau setara
Lantai 6 - Arus Lemah
• Kabel Tray L = 30 cm 180.00 meter 205,620.00 37,011,600.00 electro atau setara
Lantai 7 - Arus Lemah
• Kabel Tray L = 30 cm 180.00 meter 205,620.00 37,011,600.00 electro atau setara
Lantai Atap - Arus Lemah
• Kabel Tray L = 30 cm 80.00 meter 205,620.00 16,449,600.00 electro atau setara
SUB TOTAL III KABEL LADDER DAN KABEL TRAY
IV PEKERJAAN INSTALASI LISTRIK DAN ARMATURE
LANTAI .1
1 Instalasi titik lampu 284.00 titik 265,830.00 75,495,720.00 -
2 Instalasi titik stop kontak 203.00 titik 332,010.00 67,398,030.00 -
3 Instalasi titik stop kontak ups 112.00 titik 332,010.00 37,185,120.00 -
4 Lampu Downlight LED 13 watt 95.00 bh 385,510.00 36,623,450.00 philips atau setara
5 Lampu Downlight LED 8 watt 20.00 bh 328,320.00 6,566,400.00 philips atau setara
6 Lampu Downlight LED 13 watt Outbow 13.00 bh 473,450.00 6,154,850.00 philips atau setara
7 Lampu Tangga 10 watt 12.00 bh 350,460.00 4,205,520.00 philips atau setara
8 Lampu Bed 10 watt 15.00 bh 350,460.00 5,256,900.00 philips atau setara
9 Lampu TL Balk LED 1 x 18 watt 1.00 bh 292,780.00 292,780.00 philips atau setara
10 Lampu TL Wastafel LED 1 x 18 watt 7.00 bh 292,780.00 2,049,460.00 philips atau setara
11 Lampu RM LED 2 x 18 watt 105.00 bh 655,150.00 68,790,750.00 philips atau setara
12 LAMPU RM 300 4 x 18 W AP 6.00 bh 1,407,200.00 8,443,200.00 philips atau setara
13 Lampu TL Tangga GMS 1 x 10 watt 6.00 bh 457,880.00 2,747,280.00 philips atau setara
14 Lampu exit 4.00 bh 2,040,460.00 8,161,840.00 -
15 Saklar tunggal 38.00 bh 64,900.00 2,466,200.00 philips atau setara
16 Saklar ganda 54.00 bh 93,250.00 5,035,500.00 philips atau setara
17 Stop kontak 203.00 bh 89,920.00 18,253,760.00 philips atau setara
18 UPS 360 kva 1.00 bh 266,665,390.00 266,665,390.00 -

LANTAI .2
1 Instalasi titik lampu 251.00 titik 265,830.00 66,723,330.00 -
2 Instalasi titik stop kontak 211.00 titik 332,010.00 70,054,110.00 -
3 Instalasi titik stop kontak ups 112.00 titik 332,010.00 37,185,120.00 -
4 Lampu Downlight LED 13 watt 100.00 bh 385,510.00 38,551,000.00 philips atau setara
5 Lampu Downlight LED 8 watt 12.00 bh 328,320.00 3,939,840.00 philips atau setara
6 Lampu Bed 10 watt 26.00 bh 350,460.00 9,111,960.00 philips atau setara
7 Lampu TL Balk LED 1 x 18 watt 1.00 bh 292,780.00 292,780.00 philips atau setara
8 Lampu TL Wastafel LED 1 x 18 watt 4.00 bh 292,780.00 1,171,120.00 philips atau setara
9 Lampu RM LED 2 x 18 watt 98.00 bh 655,150.00 64,204,700.00 philips atau setara
10 Lampu TL Tangga GMS 1 x 10 watt 6.00 bh 457,880.00 2,747,280.00 philips atau setara
11 Lampu exit 4.00 bh 2,040,460.00 8,161,840.00 -
12 Saklar tunggal 53.00 bh 64,900.00 3,439,700.00 philips atau setara
13 Saklar ganda 32.00 bh 93,250.00 2,984,000.00 philips atau setara
14 Stop kontak 211.00 bh 89,920.00 18,973,120.00 philips atau setara
15 UPS 360 kva 1.00 bh 266,665,390.00 266,665,390.00 -

LANTAI .3
1 Instalasi titik lampu 290.00 titik 265,830.00 77,090,700.00 -
2 Instalasi titik stop kontak 162.00 titik 332,010.00 53,785,620.00 -
3 Instalasi titik stop kontak ups 112.00 titik 332,010.00 37,185,120.00 -
4 Lampu Downlight LED 13 watt 112.00 bh 385,510.00 43,177,120.00 philips atau setara
5 Lampu Downlight LED 8 watt 18.00 bh 328,320.00 5,909,760.00 philips atau setara
6 Lampu Bed 10 watt 15.00 bh 350,460.00 5,256,900.00 philips atau setara
7 Lampu TL Wastafel LED 1 x 18 watt 12.00 bh 292,780.00 3,513,360.00 philips atau setara
8 Lampu RM LED 2 x 18 watt 86.00 bh 655,150.00 56,342,900.00 philips atau setara
9 LAMPU RM 300 4 x 18 W AP 36.00 bh 1,407,200.00 50,659,200.00 philips atau setara
10 Lampu TL Tangga GMS 1 x 10 watt 6.00 bh 457,880.00 2,747,280.00 philips atau setara
11 Lampu exit 5.00 bh 2,040,460.00 10,202,300.00 -
12 Saklar tunggal 30.00 bh 64,900.00 1,947,000.00 philips atau setara
13 Saklar ganda 53.00 bh 93,250.00 4,942,250.00 philips atau setara
14 Stop kontak 162.00 bh 89,920.00 14,567,040.00 philips atau setara
15 UPS 360 kva 1.00 bh 266,665,390.00 266,665,390.00 -

LANTAI .4
1 Instalasi titik lampu 192.00 titik 265,830.00 51,039,360.00 -
2 Instalasi titik stop kontak 274.00 titik 332,010.00 90,970,740.00 -
3 Instalasi titik stop kontak ups 112.00 titik 332,010.00 37,185,120.00 -
4 Lampu Downlight LED 13 watt 34.00 bh 385,510.00 13,107,340.00 philips atau setara
5 Lampu Downlight LED 8 watt 6.00 bh 328,320.00 1,969,920.00 philips atau setara
6 Lampu TL Balk LED 1 x 18 watt 1.00 bh 292,780.00 292,780.00 philips atau setara
7 Lampu TL Wastafel LED 1 x 18 watt 4.00 bh 292,780.00 1,171,120.00 philips atau setara
8 Lampu RM LED 2 x 18 watt 135.00 bh 655,150.00 88,445,250.00 philips atau setara
9 Lampu TL Tangga GMS 1 x 10 watt 6.00 bh 457,880.00 2,747,280.00 philips atau setara
10 Lampu exit 6.00 bh 2,040,460.00 12,242,760.00 -
11 Saklar tunggal 16.00 bh 64,900.00 1,038,400.00 philips atau setara
12 Saklar ganda 29.00 bh 93,250.00 2,704,250.00 philips atau setara
13 Stop kontak 274.00 bh 89,920.00 24,638,080.00 philips atau setara
14 UPS 360 kva 1.00 bh 266,665,390.00 266,665,390.00 -

LANTAI .5
1 Instalasi titik lampu 321.00 titik 265,830.00 85,331,430.00 -
2 Instalasi titik stop kontak 244.00 titik 332,010.00 81,010,440.00 -
3 Instalasi titik stop kontak ups 112.00 titik 332,010.00 37,185,120.00 -
4 Lampu Downlight LED 13 watt 94.00 bh 385,510.00 36,237,940.00 philips atau setara
5 Lampu Downlight LED 8 watt 23.00 bh 328,320.00 7,551,360.00 philips atau setara
6 Lampu Bed 10 watt 52.00 bh 350,460.00 18,223,920.00 philips atau setara
7 Lampu TL Balk LED 1 x 18 watt 1.00 bh 292,780.00 292,780.00 philips atau setara
8 Lampu TL Wastafel LED 1 x 18 watt 16.00 bh 292,780.00 4,684,480.00 philips atau setara
9 Lampu RM LED 2 x 18 watt 121.00 bh 655,150.00 79,273,150.00 philips atau setara
10 Lampu TL Tangga GMS 1 x 10 watt 6.00 bh 457,880.00 2,747,280.00 philips atau setara
11 Lampu exit 8.00 bh 2,040,460.00 16,323,680.00 -
12 Saklar tunggal 41.00 bh 64,900.00 2,660,900.00 philips atau setara
13 Saklar ganda 45.00 bh 93,250.00 4,196,250.00 philips atau setara
14 Stop kontak 244.00 bh 89,920.00 21,940,480.00 philips atau setara
15 UPS 360 kva 1.00 bh 266,665,390.00 266,665,390.00 -

LANTAI .6
1 Instalasi titik lampu 311.00 titik 265,830.00 82,673,130.00 -
2 Instalasi titik stop kontak 234.00 titik 332,010.00 77,690,340.00 -
3 Instalasi titik stop kontak ups 112.00 titik 332,010.00 37,185,120.00 -
4 Lampu Downlight LED 13 watt 94.00 bh 385,510.00 36,237,940.00 philips atau setara
5 Lampu Downlight LED 8 watt 23.00 bh 328,320.00 7,551,360.00 philips atau setara
6 Lampu Bed 10 watt 42.00 bh 350,460.00 14,719,320.00 philips atau setara
7 Lampu TL Balk LED 1 x 18 watt 1.00 bh 292,780.00 292,780.00 philips atau setara
8 Lampu TL Wastafel LED 1 x 18 watt 16.00 bh 292,780.00 4,684,480.00 philips atau setara
9 Lampu RM LED 2 x 18 watt 121.00 bh 655,150.00 79,273,150.00 philips atau setara
10 Lampu TL Tangga GMS 1 x 10 watt 6.00 bh 457,880.00 2,747,280.00 philips atau setara
11 Lampu exit 8.00 bh 2,040,460.00 16,323,680.00 -
12 Saklar tunggal 41.00 bh 64,900.00 2,660,900.00 philips atau setara
13 Saklar ganda 45.00 bh 93,250.00 4,196,250.00 philips atau setara
14 Stop kontak 234.00 bh 89,920.00 21,041,280.00 philips atau setara
15 UPS 360 kva 1.00 bh 266,665,390.00 266,665,390.00 -
LANTAI .7
1 Instalasi titik lampu 322.00 titik 265,830.00 85,597,260.00 -
2 Instalasi titik stop kontak 234.00 titik 332,010.00 77,690,340.00 -
3 Instalasi titik stop kontak ups 112.00 titik 332,010.00 37,185,120.00 -
4 Lampu Downlight LED 13 watt 106.00 bh 385,510.00 40,864,060.00 philips atau setara
5 Lampu Downlight LED 8 watt 32.00 bh 328,320.00 10,506,240.00 philips atau setara
6 Lampu Bed 10 watt 33.00 bh 350,460.00 11,565,180.00 philips atau setara
7 Lampu TL Balk LED 1 x 18 watt 1.00 bh 292,780.00 292,780.00 philips atau setara
8 Lampu TL Wastafel LED 1 x 18 watt 25.00 bh 292,780.00 7,319,500.00 philips atau setara
9 Lampu RM LED 2 x 18 watt 111.00 bh 655,150.00 72,721,650.00 philips atau setara
10 Lampu TL Tangga GMS 1 x 10 watt 6.00 bh 457,880.00 2,747,280.00 philips atau setara
11 Lampu exit 8.00 bh 2,040,460.00 16,323,680.00 -
12 Saklar tunggal 50.00 bh 64,900.00 3,245,000.00 philips atau setara
13 Saklar ganda 45.00 bh 93,250.00 4,196,250.00 philips atau setara
14 Stop kontak 234.00 bh 89,920.00 21,041,280.00 philips atau setara
15 UPS 360 kva 1.00 bh 266,665,390.00 266,665,390.00 -

LANTAI .ROOF
1 Instalasi titik lampu 149.00 titik 265,830.00 39,608,670.00 -
2 Instalasi titik stop kontak 70.00 titik 332,010.00 23,240,700.00 -
3 Instalasi titik stop kontak ups 112.00 titik 332,010.00 37,185,120.00 -
4 Lampu Downlight LED 13 watt 83.00 bh 385,510.00 31,997,330.00 philips atau setara
5 Lampu Downlight LED 8 watt 8.00 bh 328,320.00 2,626,560.00 philips atau setara
6 Lampu TL Balk LED 1 x 18 watt 35.00 bh 292,780.00 10,247,300.00 philips atau setara
7 Lampu TL Wastafel LED 1 x 18 watt 6.00 bh 292,780.00 1,756,680.00 philips atau setara
8 Lampu RM LED 2 x 18 watt 8.00 bh 655,150.00 5,241,200.00 philips atau setara
9 Lampu TL Tangga GMS 1 x 10 watt 2.00 bh 457,880.00 915,760.00 philips atau setara
10 Lampu exit 7.00 bh 2,040,460.00 14,283,220.00 -
11 Saklar tunggal 7.00 bh 64,900.00 454,300.00 philips atau setara
12 Saklar ganda 13.00 bh 93,250.00 1,212,250.00 philips atau setara
13 Stop kontak 70.00 bh 89,920.00 6,294,400.00 philips atau setara
14 UPS 360 kva 1.00 bh 266,665,390.00 266,665,390.00 -
PEKERJAAN DILUAR BANGUNAN
1 Instalasi titik lampu penerangan luar 24.00 titik 1,340,430.00 32,170,320.00 -
2 Lampu Taman 12.00 bh 841,480.00 10,097,760.00 -
3 Lampu penerangan jalan + tiang 9 meter MENGUNAKAN (SOLAR CELL) 12.00 bh 8,438,000.00 101,256,000.00 philips atau setara
SUB TOTAL IV PEKERJAAN INSTALASI LISTRIK DAN ARMATURE
GRAND TOTAL PEKERJAAN ELEKTRIKAL

F PENANGKAL PETIR
Pekerjaan Pengadaan dan Pemasangan penangkal petir type EF
lengkap dengan sistim pentanahan dan down conductor BCC 50 mm2
dengan radius proteksi minimum 150 m.

Kepala penangkal petir type EF, dengan radius 1.00 ls 94,954,800.00 94,954,800.00 Kurn atau setara
proteksi minimum 150 m, lengkap dengan dudukan
kelengkapan lainnya, seperti pada gambar.
Down conductor, coaxial 50 mm2, lengkap dng
klem, kotak sambung dan pelindung pipa PVC.
Grounding system, batang tembaga diameter 1",
panjang 6 m, sampai dicapai tahanan pentanahan
maksimum 2 Ohm. Lengkap dengan bak kontrol,
sambungan, las / klem, seperti pada gambar.
Accessories, alat bantu, dan kelengkapan lainya.
GRAND TOTAL PEKERJAAN PENANGKAL PETIR

G PEKERJAAN ELEKTRONIK
I SISTEM TELEPON
Pengadaan dan pemasangan sistim telepon lengkap PABX, out-let
telepon, Hand set, sistim instalasi dan kelengkapan lainnya.

1 Peralatan Utama
PABX Kapasitas 200 extention lengkap power 16 line incoming
supply dan batery back-up
Billing System dan Telephone Management Syatem
Main Distribution Frame, 200 pair in, 200 pair out.
Instalasi perkabelan antara PABX ke MDF
Sambungan line incoming TELKOM
Main Unit 10 slot,KX-TDA600X
1 optional Slot 2.00 Unit 45,870,760.00 91,741,520.00 Panasonic atau setara
CO Card KX-TDA6181X 4.00 Unit 12,542,460.00 50,169,840.00 Panasonic atau setara
08 Port Digital Hybrid
KX-TDA0170X
Ext Card 2.00 Unit 6,221,910.00 12,443,820.00 Panasonic atau setara
24 Port Single LinaKX-TDA6178X
Telp Card Call ID Card 10.00 Unit 11,953,090.00 119,530,900.00 Panasonic atau setara
L Type Power SupplyKX-TDA0103X
Unit 2.00 Unit 12,024,190.00 24,048,380.00 Panasonic atau setara
2 Mesin Penjawab :
Option 3-Slot BaseKX-TDA0190X
Card 2.00 Unit 2,976,030.00 5,952,060.00 Panasonic atau setara
4 Channel Message KX-TDA0191X
Card 2.00 Unit 7,474,160.00 14,948,320.00 Panasonic atau setara
3 Telephone untuk Operator:
6 Line LCD Display,KX-DT346X
24 Flexible CO Buttons, Digital SP Phone 2.00 Unit 4,535,470.00 9,070,940.00 Panasonic atau setara
60 DSS Console KX-DT390 4.00 Unit 2,705,570.00 10,822,280.00 Panasonic atau setara
4 Telephone untuk Extention Tertentu:
3 Line LCD Display,KX-DT333X
24 Flexible CO Buttons, Digital SP Phone 10.00 Unit 2,600,610.00 26,006,100.00 Panasonic atau setara
5 MDF Box Krone 200 pair 2.00 Unit 2,766,510.00 5,533,020.00 -
6 Back Up Battery
Back Up Battery Cable
KX-A229
for PSU - L 2.00 Unit 2,953,340.00 5,906,680.00 Panasonic atau setara
Battery Bank UB 2440 2.00 Unit 10,929,780.00 21,859,560.00 Panasonic atau setara
Battery 32 AMP 6.00 Unit 3,226,240.00 19,357,440.00 -
7 Billing system include Personal Computer + printer 2.00 Unit 15,059,880.00 30,119,760.00 -
8 Biaya Testing & Commisioning PABX 2.00 ls 7,539,080.00 15,078,160.00 -

Instalasi Lantai -1 A
- Central Terminal Box (CTB 200 Pairs) 1.00 Unit 3,674,810.00 3,674,810.00 -
- Terminal Box (TB TOB) Kap. 100 pairs 1.00 Unit 724,600.00 724,600.00 -
- Kabel tuvur, R-V (PE) V 30 x (2x0,6 mm2) 120.00 meter 34,170.00 4,100,400.00 -
- Socket / Outlet Telephone 14.00 Buah 174,910.00 2,448,740.00 -
- Instalasi socket / outlet telepohone 14.00 Titik 420,560.00 5,887,840.00 -
- Pesawat telephoneKX-T2371
standard 14.00 Buah 301,740.00 4,224,360.00 Panasonic atau setara

Instalasi Lantai 2 A
- Terminal Box (TB TOB) Kap. 100 pairs 1.00 Unit 724,600.00 724,600.00 -
- Kabel tuvur, R-V (PE) V 30 x (2x0,6 mm2) 120.00 meter 34,170.00 4,100,400.00 -
- Socket / Outlet Telephone 22.00 Buah 174,910.00 3,848,020.00 -
- Instalasi socket / outlet telepohone 22.00 Titik 420,560.00 9,252,320.00 -
- Pesawat telephoneKX-T2371
standard 22.00 Buah 301,740.00 6,638,280.00 Panasonic atau setara
Instalasi Lantai 3 A
- Terminal Box (TB TOB) Kap. 100 pairs 1.00 Unit 724,600.00 724,600.00 -
- Kabel tuvur, R-V (PE) V 30 x (2x0,6 mm2) 120.00 meter 34,170.00 4,100,400.00 -
- Socket / Outlet Telephone 10.00 Buah 174,910.00 1,749,100.00 -
- Instalasi socket / outlet telepohone 10.00 Titik 420,560.00 4,205,600.00 -
- Pesawat telephoneKX-T2371
standard 10.00 Buah 301,740.00 3,017,400.00 Panasonic atau setara

Instalasi Lantai 4 A
- Terminal Box (TB TOB) Kap. 100 pairs 1.00 Unit 724,600.00 724,600.00 -
- Kabel tuvur, R-V (PE) V 40 x (2x0,6 mm2) 120.00 meter 34,170.00 4,100,400.00 -
- Socket / Outlet Telephone 64.00 Buah 174,910.00 11,194,240.00 -
- Instalasi socket / outlet telepohone 64.00 Titik 420,560.00 26,915,840.00 -
- Pesawat telephoneKX-T2371
standard 64.00 Buah 301,740.00 19,311,360.00 Panasonic atau setara

Instalasi Lantai 5 A
- Terminal Box (TB TOB) Kap. 100 pairs 1.00 Unit 724,600.00 724,600.00 -
- Kabel tuvur, R-V (PE) V 40 x (2x0,6 mm2) 120.00 meter 34,170.00 4,100,400.00 -
- Socket / Outlet Telephone 9.00 Buah 174,910.00 1,574,190.00 -
- Instalasi socket / outlet telepohone 9.00 Titik 420,560.00 3,785,040.00 -
- Pesawat telephoneKX-T2371
standard 9.00 Buah 301,740.00 2,715,660.00 Panasonic atau setara

Instalasi Lantai 6 A
- Terminal Box (TB TOB) Kap. 100 pairs 1.00 Unit 724,600.00 724,600.00 -
- Kabel tuvur, R-V (PE) V 40 x (2x0,6 mm2) 120.00 meter 34,170.00 4,100,400.00 -
- Socket / Outlet Telephone 9.00 Buah 174,910.00 1,574,190.00 -
- Instalasi socket / outlet telepohone 9.00 Titik 420,560.00 3,785,040.00 -
- Pesawat telephoneKX-T2371
standard 9.00 Buah 301,740.00 2,715,660.00 Panasonic atau setara

Instalasi Lantai 7 A
- Terminal Box (TB TOB) Kap. 100 pairs 1.00 Unit 724,600.00 724,600.00 -
- Kabel tuvur, R-V (PE) V 40 x (2x0,6 mm2) 120.00 meter 34,170.00 4,100,400.00 -
- Socket / Outlet Telephone 9.00 Buah 174,910.00 1,574,190.00 -
- Instalasi socket / outlet telepohone 9.00 Titik 420,560.00 3,785,040.00 -
- Pesawat telephoneKX-T2371
standard 9.00 Buah 301,740.00 2,715,660.00 Panasonic atau setara

INTALASI LANTAI ATAP


- Terminal Box (TB TOB) Kap. 100 pairs 1.00 Unit 724,600.00 724,600.00 -
- Kabel tuvur, R-V (PE) V 40 x (2x0,6 mm2) 120.00 meter 34,170.00 4,100,400.00 -
- Socket / Outlet Telephone 2.00 Buah 174,910.00 349,820.00 -
- Instalasi socket / outlet telepohone 2.00 Titik 420,560.00 841,120.00 -
- Pesawat telephoneKX-T2371
standard 2.00 Buah 301,740.00 603,480.00 Panasonic atau setara
Testing & Commisioining 1.00 lot 2,413,990.00 2,413,990.00 -
Peralatan Bantu 1.00 lot 967,350.00 967,350.00 -
GRAND TOTAL SISTEM TELEPON

II SISTEM FIRE ALARM


Pengadaan dan Pemasangan Master Control Fire Alarm detector,
Manual Push button, Alarm Bell, Indicator Lamp,
kualitas setara yang disetujui termasuk instalasi, terminal
box lengkap dengan Accessories seperti yang disyaratkan, kabel
instalasi dalam pipa PVC high impact 20mm
1 Peralatan Utama
a Master Control Fire Alarm, kapasitas 20 zone 1.00 unit 25,719,840.00 25,719,840.00 hooseki atau setara
Lengkap batery NiCad, rectifier, buzzer, indicator
lamp, dan kelengkapan lain sesuai gambar
b Anouncitor/buzzer paralel indicator lamp. 6.00 unit 10,441,810.00 62,650,860.00 hooseki atau setara
dan perkabelan dari MCFA ke paralel ind. Lamp,
di ruang satpam.
c Perkabelan, alat bantu, pengetesan 2.00 ls 6,416,820.00 12,833,640.00 -

Instalasi Lantai 1 A
- Terminal Box 1.00 Unit 894,920.00 894,920.00 -
- Kabel Tuvur dari MDF ke TB, NYY 4(2x2,5 mm2) 120.00 meter 12,160.00 1,459,200.00 -
- ROR 3.00 Buah 196,860.00 590,580.00 -
- Smoke Detector 74.00 Buah 902,600.00 66,792,400.00 hooseki atau setara
- End Of Line 1.00 Buah 99,170.00 99,170.00 -
- Manual push button, Alarm bell, Indicator lamp & Fighting Tlp. 2.00 Buah 410,000.00 820,000.00 -
- Instalasi Jack Telephone 2.00 Titik 296,350.00 592,700.00 -
- Titik Instalasi Detector & Monitor, NYAFHY 4(1x1.5 mm2) 77.00 Titik 298,060.00 22,950,620.00 hooseki atau setara

Instalasi Lantai 2 A
- Terminal Box 1.00 Unit 894,920.00 894,920.00 -
- Kabel Tuvur dari MDF ke TB, NYY 4(2x2,5 mm2) 120.00 meter 12,160.00 1,459,200.00 -
- ROR 2.00 Buah 196,860.00 393,720.00 -
- Smoke Detector 78.00 Buah 902,600.00 70,402,800.00 hooseki atau setara
- End Of Line 3.00 Buah 99,170.00 297,510.00 -
- Manual push button, Alarm bell, Indicator lamp & Fighting Tlp. 2.00 Buah 410,000.00 820,000.00 hooseki atau setara
- Instalasi Jack Telephone 2.00 Titik 296,350.00 592,700.00 -
- Titik Instalasi Detector & Monitor, NYAFHY 4(1x1.5 mm2) 80.00 Titik 298,060.00 23,844,800.00 hooseki atau setara

Instalasi Lantai 3 A
- Terminal Box 1.00 Unit 894,920.00 894,920.00 -
- Kabel Tuvur dari MDF ke TB, NYY 4(2x2,5 mm2) 120.00 meter 12,160.00 1,459,200.00 -
- ROR 2.00 Buah 196,860.00 393,720.00 -
- Smoke Detector 75.00 Buah 902,600.00 67,695,000.00 hooseki atau setara
- End Of Line 2.00 Buah 99,170.00 198,340.00 -
- Manual push button, Alarm bell, Indicator lamp & Fighting Tlp. 2.00 Buah 410,000.00 820,000.00 hooseki atau setara
- Instalasi Jack Telephone 2.00 Titik 296,350.00 592,700.00 -
- Titik Instalasi Detector & Monitor, NYAFHY 4(1x1.5 mm2) 77.00 Titik 298,060.00 22,950,620.00 hooseki atau setara

Instalasi Lantai 4 A
- Terminal Box 1.00 Unit 894,920.00 894,920.00 -
- Kabel Tuvur dari MDF ke TB, NYY 4(2x2,5 mm2) 120.00 meter 12,160.00 1,459,200.00 -
- ROR 2.00 Buah 196,860.00 393,720.00 -
- Smoke Detector 59.00 Buah 902,600.00 53,253,400.00 hooseki atau setara
- End Of Line 2.00 Buah 99,170.00 198,340.00 -
- Manual push button, Alarm bell, Indicator lamp & Fighting Tlp. 2.00 Buah 410,000.00 820,000.00 hooseki atau setara
- Instalasi Jack Telephone 2.00 Titik 296,350.00 592,700.00 -
- Titik Instalasi Detector & Monitor, NYAFHY 4(1x1.5 mm2) 61.00 Titik 298,060.00 18,181,660.00 hooseki atau setara

Instalasi Lantai 5 A
- Terminal Box 1.00 Unit 894,920.00 894,920.00 -
- Kabel Tuvur dari MDF ke TB, NYY 4(2x2,5 mm2) 120.00 meter 12,160.00 1,459,200.00 -
- ROR 2.00 Buah 196,860.00 393,720.00 -
- Smoke Detector 72.00 Buah 902,600.00 64,987,200.00 hooseki atau setara
- End Of Line 2.00 Buah 99,170.00 198,340.00 -
- Manual push button, Alarm bell, Indicator lamp & Fighting Tlp. 2.00 Buah 410,000.00 820,000.00 hooseki atau setara
- Instalasi Jack Telephone 2.00 Titik 296,350.00 592,700.00 -
- Titik Instalasi Detector & Monitor, NYAFHY 4(1x1.5 mm2) 74.00 Titik 298,060.00 22,056,440.00 hooseki atau setara

Instalasi Lantai 6 A
- Terminal Box 1.00 Unit 894,920.00 894,920.00 -
- Kabel Tuvur dari MDF ke TB, NYY 4(2x2,5 mm2) 120.00 meter 12,160.00 1,459,200.00 -
- ROR 2.00 Buah 196,860.00 393,720.00 -
- Smoke Detector 72.00 Buah 902,600.00 64,987,200.00 hooseki atau setara
- End Of Line 2.00 Buah 99,170.00 198,340.00 -
- Manual push button, Alarm bell, Indicator lamp & Fighting Tlp. 2.00 Buah 410,000.00 820,000.00 hooseki atau setara
- Instalasi Jack Telephone 2.00 Titik 296,350.00 592,700.00 -
- Titik Instalasi Detector & Monitor, NYAFHY 4(1x1.5 mm2) 74.00 Titik 298,060.00 22,056,440.00 hooseki atau setara

Instalasi Lantai 7 A
- Terminal Box 1.00 Unit 894,920.00 894,920.00 -
- Kabel Tuvur dari MDF ke TB, NYY 4(2x2,5 mm2) 120.00 meter 12,160.00 1,459,200.00 -
- ROR 2.00 Buah 196,860.00 393,720.00 -
- Smoke Detector 72.00 Buah 902,600.00 64,987,200.00 hooseki atau setara
- End Of Line 2.00 Buah 99,170.00 198,340.00 -
- Manual push button, Alarm bell, Indicator lamp & Fighting Tlp. 2.00 Buah 410,000.00 820,000.00 hooseki atau setara
- Instalasi Jack Telephone 2.00 Titik 296,350.00 592,700.00 -
- Titik Instalasi Detector & Monitor, NYAFHY 4(1x1.5 mm2) 74.00 Titik 298,060.00 22,056,440.00 hooseki atau setara

Instalasi Lantai Atap


- Terminal Box 1.00 Unit 894,920.00 894,920.00 -
- Kabel Tuvur dari MDF ke TB, NYY 4(2x2,5 mm2) 100.00 meter 12,160.00 1,216,000.00 -
- ROR 51.00 Buah 196,860.00 10,039,860.00 -
- Smoke Detector 1.00 Buah 902,600.00 902,600.00 hooseki atau setara
- End Of Line 2.00 Buah 99,170.00 198,340.00 -
- Manual push button, Alarm bell, Indicator lamp & Fighting Tlp. 2.00 Buah 410,000.00 820,000.00 hooseki atau setara
- Instalasi Jack Telephone 2.00 Titik 296,350.00 592,700.00 -
- Titik Instalasi Detector & Monitor, NYAFHY 4(1x1.5 mm2) 52.00 Titik 298,060.00 15,499,120.00 hooseki atau setara
Testing & Commisioining 1.00 Ls 2,274,800.00 2,274,800.00 -
Peralatan Bantu 1.00 Ls 913,150.00 913,150.00 -
GRAND TOTAL SISTEM FIRE ALARM
SUB. TOTAL

III SISTEM TATA SUARA


Pengadaan dan Pemasangan Sistem Tata Suara, peralatan utama
tata suara, speaker ex. TOA, National atau kualitas setara yang
disetujui termasuk Instalasi, terminal Box, lengkap dengan
Accessories seperti yang disyaratkan. Kabel Instalasi dalam pipa
PVC High impact dia. 20 mm2.

1 Peralatan Utama Back Ground Music


Dynamic Microphone c/w Table / Floor Stand 2.00 bh 4,141,150.00 8,282,300.00 Toa atau setara
Chime Microphone 4 tone 2.00 bh 2,109,560.00 4,219,120.00 Toa atau setara
Audio Mixer Pre Amplifier, minimal 4 input 2.00 bh 10,152,980.00 20,305,960.00 Toa atau setara
Power Amplifier 240 Watt rms 6.00 bh 5,052,860.00 30,317,160.00 Toa atau setara
CD / MP3 Players 2.00 bh 748,860.00 1,497,720.00 -
Portable Rack Cabinnet, dengan power 2.00 ls 9,714,640.00 19,429,280.00 Toa atau setara
supplay unit, speaker monitor, blower, meter
Speaker selector 10 kanal 2.00 ls 4,543,210.00 9,086,420.00 Toa atau setara

2 Peralatan Utama Car Call System


Chime Microphone 4 tone 2.00 bh 2,109,560.00 4,219,120.00 Toa atau setara
Audio Mixer Pre Amplifier, minimal 4 input 2.00 bh 10,152,980.00 20,305,960.00 Toa atau setara
Power Amplifier 240 Watt rms 2.00 bh 5,052,860.00 10,105,720.00 Toa atau setara
Portable Rack Cabinnet, dengan power 2.00 ls 9,714,640.00 19,429,280.00 Toa atau setara
supplay unit, blower
Speaker selector 4 kanal 2.00 ls 4,543,210.00 9,086,420.00 Toa atau setara

3 insatalasi Halaman untuk CarCall


Terminal Box Speaker SB-D1 1.00 bh 1,702,540.00 1,702,540.00 Toa atau setara
Speaker Ceiling 3 W 2.00 bh 319,100.00 638,200.00 Toa atau setara
Speaker kolom 10 W, dengan dudukan 8.00 bh 760,800.00 6,086,400.00 Toa atau setara
Speaker Horn 20 W, dengan tiang 2m dan pondasi 4.00 bh 843,990.00 3,375,960.00 Toa atau setara
Instalasi speaker ceiling dan kolom, NYMHY 2x1,5mm2 10.00 ttk 304,810.00 3,048,100.00 -
dalam pipa PVC 20mm
Instalasi speaker horn, NYRGbY 2x2,5mm2 4.00 ttk 304,810.00 1,219,240.00 -

Instalasi Lantai 1 A
- Terminal Box (TB-S.OB) 1.00 Unit 1,702,540.00 1,702,540.00 -
- Kabel Tuvur, ke terminal Box, NYMHY 3(3x1.5 mm2) 120.00 meter 11,160.00 1,339,200.00 -
- Ceiling Speaker 3 W 19.00 Buah 319,430.00 6,069,170.00 Toa atau setara
- Ceiling speaker emergency 1 W/100dB 39.00 Buah 231,540.00 9,030,060.00 Toa atau setara
- Wall Speaker 6 W 3.00 Buah 669,920.00 2,009,760.00 Toa atau setara
- Volume Control 25.00 Buah 280,960.00 7,024,000.00 Toa atau setara
- Titik Instalasi Ceiling Speaker 61.00 Titik 304,810.00 18,593,410.00 -
- Titik Instalasi Volume Control 25.00 Titik 304,810.00 7,620,250.00 -

Instalasi Lantai 2 A
- Terminal Box (TB-S.2B) 1.00 Unit 1,702,540.00 1,702,540.00 -
- Kabel Tuvur, ke terminal Box, NYMHY 3(3x1.5 mm2) 120.00 meter 11,160.00 1,339,200.00 -
- Ceiling Speaker 3 W 18.00 Buah 319,430.00 5,749,740.00 Toa atau setara
- Ceiling speaker emergency 1 W/100dB 39.00 Buah 231,540.00 9,030,060.00 Toa atau setara
- Wall Speaker 6 W 3.00 Buah 669,920.00 2,009,760.00 Toa atau setara
- Volume Control 18.00 Buah 280,960.00 5,057,280.00 Toa atau setara
- Titik Instalasi Ceiling Speaker 60.00 Titik 304,810.00 18,288,600.00 -
- Titik Instalasi Volume Control 18.00 Titik 304,810.00 5,486,580.00 -

Instalasi Lantai 3 A
- Terminal Box (TB-S.3B) 1.00 Unit 1,702,540.00 1,702,540.00 -
- Kabel Tuvur, ke terminal Box, NYMHY 3(3x1.5 mm2) 120.00 meter 11,160.00 1,339,200.00 -
- Ceiling Speaker 3 W 18.00 Buah 319,430.00 5,749,740.00 Toa atau setara
- Ceiling speaker emergency 1 W/100dB 42.00 Buah 231,540.00 9,724,680.00 Toa atau setara
- Wall Speaker 6 W 3.00 Buah 669,920.00 2,009,760.00 Toa atau setara
- Volume Control 29.00 Buah 280,960.00 8,147,840.00 Toa atau setara
- Titik Instalasi Ceiling Speaker 63.00 Titik 304,810.00 19,203,030.00 -
- Titik Instalasi Volume Control 29.00 Titik 304,810.00 8,839,490.00 -

Instalasi Lantai 4 A
- Terminal Box (TB-S.4B) 1.00 Unit 1,702,540.00 1,702,540.00 -
- Kabel Tuvur, ke terminal Box, NYMHY 3(3x1.5 mm2) 120.00 meter 11,160.00 1,339,200.00 -
- Ceiling Speaker 3 W 7.00 Buah 319,430.00 2,236,010.00 Toa atau setara
- Ceiling speaker emergency 1 W/100dB 44.00 Buah 231,540.00 10,187,760.00 Toa atau setara
- Wall Speaker 6 W 3.00 Buah 669,920.00 2,009,760.00 Toa atau setara
- Volume Control 12.00 Buah 280,960.00 3,371,520.00 Toa atau setara
- Titik Instalasi Ceiling Speaker 54.00 Titik 304,810.00 16,459,740.00 -
- Titik Instalasi Volume Control 12.00 Titik 304,810.00 3,657,720.00 -

Instalasi Lantai 5 A
- Terminal Box (TB-S.5B) 1.00 Unit 1,702,540.00 1,702,540.00 -
- Kabel Tuvur, ke terminal Box, NYMHY 3(3x1.5 mm2) 120.00 meter 11,160.00 1,339,200.00 -
- Ceiling Speaker 3 W 25.00 Buah 319,430.00 7,985,750.00 Toa atau setara
- Ceiling speaker emergency 1 W/100dB 32.00 Buah 231,540.00 7,409,280.00 Toa atau setara
- Wall Speaker 6 W 3.00 Buah 669,920.00 2,009,760.00 Toa atau setara
- Volume Control 23.00 Buah 280,960.00 6,462,080.00 Toa atau setara
- Titik Instalasi Ceiling Speaker 60.00 Titik 304,810.00 18,288,600.00 -
- Titik Instalasi Volume Control 23.00 Titik 304,810.00 7,010,630.00 -

Instalasi Lantai 6 A
- Terminal Box (TB-S.6B) 1.00 Unit 1,702,540.00 1,702,540.00 -
- Kabel Tuvur, ke terminal Box, NYMHY 3(3x1.5 mm2) 120.00 meter 11,160.00 1,339,200.00 -
- Ceiling Speaker 3 W 25.00 Buah 319,430.00 7,985,750.00 Toa atau setara
- Ceiling speaker emergency 1 W/100dB 32.00 Buah 231,540.00 7,409,280.00 Toa atau setara
- Wall Speaker 6 W 3.00 Buah 669,920.00 2,009,760.00 Toa atau setara
- Volume Control 23.00 Buah 280,960.00 6,462,080.00 Toa atau setara
- Titik Instalasi Ceiling Speaker 60.00 Titik 304,810.00 18,288,600.00 -
- Titik Instalasi Volume Control 23.00 Titik 304,810.00 7,010,630.00 -

Instalasi Lantai 7 A
- Terminal Box (TB-S.7B) 1.00 Unit 1,702,540.00 1,702,540.00 -
- Kabel Tuvur, ke terminal Box, NYMHY 3(3x1.5 mm2) 120.00 meter 11,160.00 1,339,200.00 -
- Ceiling Speaker 3 W 25.00 Buah 319,430.00 7,985,750.00 Toa atau setara
- Ceiling speaker emergency 1 W/100dB 32.00 Buah 231,540.00 7,409,280.00 Toa atau setara
- Wall Speaker 6 W 3.00 Buah 669,920.00 2,009,760.00 Toa atau setara
- Volume Control 32.00 Buah 280,960.00 8,990,720.00 Toa atau setara
- Titik Instalasi Ceiling Speaker 60.00 Titik 304,810.00 18,288,600.00 -
- Titik Instalasi Volume Control 32.00 Titik 304,810.00 9,753,920.00 -

Instalasi Lantai Atap


- Terminal Box (TB-S.AB) 1.00 Unit 1,702,540.00 1,702,540.00 -
- Kabel Tuvur, ke terminal Box, NYMHY 3(3x1.5 mm2) 120.00 meter 11,160.00 1,339,200.00 -
- Ceiling Speaker 3 W 19.00 Buah 319,430.00 6,069,170.00 Toa atau setara
- Ceiling speaker emergency 1 W/100dB 19.00 Buah 231,540.00 4,399,260.00 Toa atau setara
- Wall Speaker 6 W 3.00 Buah 669,920.00 2,009,760.00 Toa atau setara
- Volume Control 2.00 Buah 280,960.00 561,920.00 Toa atau setara
- Titik Instalasi Ceiling Speaker 41.00 Titik 304,810.00 12,497,210.00 -
- Titik Instalasi Volume Control 2.00 Titik 304,810.00 609,620.00 -
GRAND TOTAL SISTEM TATA SUARA

IV PEKERJAAN MATV
SISTEM DISTRIBUSI CABANG
Pengadaan dan pemasangan semua instalasi lengkap terpasang
dengan accessories
Peralatan Utama 4.00 unit 10,898,340.00 43,593,360.00 Zinwell/Hirscmann atau setara
Antena VHF/UHF 2.00 unit 7,208,030.00 14,416,060.00 -
Antena Parabola diameter 16 Feet 14.00 unit 3,503,200.00 49,044,800.00 -
Satelite Receiver 2.00 unit 2,508,120.00 5,016,240.00 -
Modulator 2.00 unit 5,978,640.00 11,957,280.00 Zinwell/Hirscmann atau setara
DVD/VCD Disk Player 2.00 unit 1,608,610.00 3,217,220.00 -
Rack Kabinet 2.00 unit 1,056,070.00 2,112,140.00 -
Monitor TV, 21 Inch 2.00 ttk 2,222,180.00 4,444,360.00 -
Instalasi titik TV dengan kabel Coaxial 5C-2V 75 ohm
dalam Conduit 20 mm2 160.00 meter 370,910.00 59,345,600.00 -
Coaxial cable 7C - 2V, dari antena ke Mixer 2.00 ls 1,003,020.00 2,006,040.00 -
Material Bantu

Lantai 1 A
Booster amplifier 1.00 buah 3,111,090.00 3,111,090.00 Zinwell/Hirscmann atau setara
Instalasi titik TV dengan kabel Coaxial 5C-2V 75 ohm
dalam Conduit 20 mm2 7.00 titik 386,080.00 2,702,560.00 -
Outlet TV 7.00 buah 214,820.00 1,503,740.00 -
Splitter 6 way 3.00 buah 194,250.00 582,750.00 -

Lantai 2 A
Booster amplifier 1.00 buah 3,111,090.00 3,111,090.00 Zinwell/Hirscmann atau setara
Instalasi titik TV dengan kabel Coaxial 5C-2V 75 ohm
dalam Conduit 20 mm2 8.00 titik 386,080.00 3,088,640.00 -
Outlet TV 8.00 buah 214,820.00 1,718,560.00 -
Splitter 6 way 3.00 buah 194,250.00 582,750.00 -

Lantai 3 A
Booster amplifier 1.00 buah 3,111,090.00 3,111,090.00 Zinwell/Hirscmann atau setara
Instalasi titik TV dengan kabel Coaxial 5C-2V 75 ohm
dalam Conduit 20 mm2 3.00 titik 386,080.00 1,158,240.00 -
Outlet TV 3.00 buah 214,820.00 644,460.00 -
Splitter 6 way 1.00 buah 194,250.00 194,250.00 -

Lantai 4 A
Booster amplifier 1.00 buah 3,111,090.00 3,111,090.00 Zinwell/Hirscmann atau setara
Instalasi titik TV dengan kabel Coaxial 5C-2V 75 ohm
dalam Conduit 20 mm2 7.00 titik 386,080.00 2,702,560.00 -
Outlet TV 7.00 buah 214,820.00 1,503,740.00 -
Splitter 6 way 3.00 buah 194,250.00 582,750.00 -

Lantai 5 A
Booster amplifier 1.00 buah 3,111,090.00 3,111,090.00 Zinwell/Hirscmann atau setara
Instalasi titik TV dengan kabel Coaxial 5C-2V 75 ohm
dalam Conduit 20 mm2 16.00 titik 386,080.00 6,177,280.00 -
Outlet TV 16.00 buah 214,820.00 3,437,120.00 -
Splitter 6 way 6.00 buah 194,250.00 1,165,500.00 -

Lantai 6 A
Booster amplifier 1.00 buah 3,111,090.00 3,111,090.00 Zinwell/Hirscmann atau setara
Instalasi titik TV dengan kabel Coaxial 5C-2V 75 ohm
dalam Conduit 20 mm2 17.00 titik 386,080.00 6,563,360.00 -
Outlet TV 17.00 buah 214,820.00 3,651,940.00 -
Splitter 6 way 6.00 buah 194,250.00 1,165,500.00 -

Lantai 7 A
Booster amplifier 1.00 buah 3,111,090.00 3,111,090.00 Zinwell/Hirscmann atau setara
Instalasi titik TV dengan kabel Coaxial 5C-2V 75 ohm
dalam Conduit 20 mm2 25.00 titik 386,080.00 9,652,000.00 -
Outlet TV 25.00 buah 214,820.00 5,370,500.00 -
Splitter 6 way 6.00 buah 194,250.00 1,165,500.00 -
SUB. TOTAL
Lantai Atap
Booster amplifier 1.00 buah 3,111,090.00 3,111,090.00 Zinwell/Hirscmann atau setara
Instalasi titik TV dengan kabel Coaxial 5C-2V 75 ohm
dalam Conduit 20 mm2 3.00 titik 386,080.00 1,158,240.00 -
Outlet TV 3.00 buah 214,820.00 644,460.00 -
Splitter 3 way 1.00 buah 194,250.00 194,250.00 -
GRAND TOTAL PEKERJAAN MATV

SUB. TOTAL
V PEKERJAAN CCTV
Pengadaan dan Pemasangan Sistem CCTV, peralatan utama
Accessories seperti yang disyaratkan. Kabel Instalasi dalam pipa
PVC High impact dia. 20 mm2.

Lantai 1
- Peralatan Utama 1.00 ls 209,577,620.00 209,577,620.00 Uniview/Tiandy atau setara
Master control system
- Colour monitor LCD 17"
- Digital Disc Recorder ( real time)
- CD/DVD writer
- System control Control
- Laser Printer
- Personal computer
- Interface Unit
- Rak untuk peralatan utama
- Acesories,alat bantu

- Camera Indoor (Dome) 13.00 bh 1,128,700.00 14,673,100.00 Uniview/Tiandy atau setara


- Instalasi Camera 13.00 ttk 1,028,380.00 13,368,940.00 -

Lantai 2
- Camera Indoor (Dome) 15.00 bh 1,128,700.00 16,930,500.00 Uniview/Tiandy atau setara
- Instalasi Camera 15.00 ttk 1,028,380.00 15,425,700.00 -

Lantai 3
- Camera Fix 2.00 bh 2,720,800.00 5,441,600.00 Uniview/Tiandy atau setara
- Camera Indoor (Dome) 14.00 bh 1,128,700.00 15,801,800.00 Uniview/Tiandy atau setara
- Instalasi Camera 16.00 ttk 1,028,380.00 16,454,080.00 -

Lantai 4
- Camera Indoor (Dome) 14.00 bh 1,128,700.00 15,801,800.00 Uniview/Tiandy atau setara
- Instalasi Camera 14.00 ttk 1,028,380.00 14,397,320.00 -
Lantai 5
- Camera Indoor (Dome) 17.00 bh 1,128,700.00 19,187,900.00 Uniview/Tiandy atau setara
- Instalasi Camera 17.00 ttk 1,028,380.00 17,482,460.00 -

Lantai 6
- Camera Indoor (Dome) 17.00 bh 1,128,700.00 19,187,900.00 Uniview/Tiandy atau setara
- Instalasi Camera 17.00 ttk 1,028,380.00 17,482,460.00 -

Lantai 7
- Camera Indoor (Dome) 17.00 bh 1,128,700.00 19,187,900.00 Uniview/Tiandy atau setara
- Instalasi Camera 17.00 ttk 1,028,380.00 17,482,460.00 -

Lantai Atap
- Camera Fix 6.00 bh 2,720,800.00 16,324,800.00 Uniview/Tiandy atau setara
- Camera Indoor (Dome) 11.00 bh 1,128,700.00 12,415,700.00 Uniview/Tiandy atau setara
- Instalasi Camera 17.00 ttk 1,028,380.00 17,482,460.00 -

Halaman
- Camera Outdoor 8.00 bh 2,720,800.00 21,766,400.00 Uniview/Tiandy atau setara
- Instalasi Camera 8.00 ttk 1,028,380.00 8,227,040.00 -
GRAND TOTAL PEKERJAAN CCTV

VI PEKERJAAN NURSE CALL


SEDCO NURSE CALL 6000 SYSTEMS
I NURSE CALL SYSTEMS PADA LANTAI DUA
1 PERAWATAN UMUM
a. - MASTER CONTROL NURSE CALL
1 Main Control Box 3.00 unit 19,354,860.00 58,064,580.00 Lokal
2 Nurse Host Terminal 3.00 unit 19,187,080.00 57,561,240.00 Aiphone
3 PC Software dan Data Converter 3.00 unit 34,221,700.00 102,665,100.00 Aiphone/Lokal
4 Corridor Display 3.00 unit 271,360.00 814,080.00 Aiphone
b. - ROOM EQUIPMENT
1 Reset Button 3.00 Buah 222,240.00 666,720.00 Aiphone
2 Bedside call switch 19.00 Buah 378,190.00 7,185,610.00 Aiphone
3 Ceilling Station 3.00 Buah 855,250.00 2,565,750.00 Aiphone
c. - INSTALASI NURSE CALL
Instalasi Nurse Call Termasuk Testing Dan Commisioning 37.00 titik 228,280.00 8,446,360.00 Supreme

II NURSE CALL SYSTEMS PADA LANTAI LIMA


1 PERAWATAN UMUM
a. - MASTER CONTROL NURSE CALL
1 Main Control Box 2.00 unit 19,528,540.00 39,057,080.00 Lokal
2 Nurse Host Terminal 2.00 unit 19,187,080.00 38,374,160.00 Aiphone
3 PC Software dan Data Converter 2.00 unit 34,221,700.00 68,443,400.00 Aiphone/Lokal
4 Corridor Display 14.00 unit 271,360.00 3,799,040.00 Aiphone
b. - ROOM EQUIPMENT
1 Reset Button 14.00 Buah 222,240.00 3,111,360.00 Aiphone
2 Bedside call switch 52.00 Buah 378,190.00 19,665,880.00 Aiphone
3 Ceilling Station 14.00 Buah 855,250.00 11,973,500.00 Aiphone
4 Bathroom Pullchord, Moisture-Resistant 14.00 Buah 821,050.00 11,494,700.00 Aiphone
c. - INSTALASI NURSE CALL
Instalasi Nurse Call Termasuk Testing Dan Commisioning 114.00 titik 228,280.00 26,023,920.00 Supreme
III NURSE CALL SYSTEMS PADA LANTAI ENAM
1 PERAWATAN UMUM
a. - MASTER CONTROL NURSE CALL
1 Main Control Box 2.00 unit 19,528,540.00 39,057,080.00 Lokal
2 Nurse Host Terminal 2.00 unit 19,187,080.00 38,374,160.00 Aiphone
3 PC Software dan Data Converter 2.00 unit 34,221,700.00 68,443,400.00 Aiphone/Lokal
4 Corridor Display 14.00 unit 271,360.00 3,799,040.00 Aiphone
b. - ROOM EQUIPMENT
1 Reset Button 14.00 Buah 222,240.00 3,111,360.00 Aiphone
2 Bedside call switch 42.00 Buah 378,190.00 15,883,980.00 Aiphone
3 Ceilling Station 14.00 Buah 855,250.00 11,973,500.00 Aiphone
4 Bathroom Pullchord, Moisture-Resistant 14.00 Buah 821,050.00 11,494,700.00 Aiphone
c. - INSTALASI NURSE CALL
Instalasi Nurse Call Termasuk Testing Dan Commisioning 104.00 titik 228,280.00 23,741,120.00 Supreme

IV NURSE CALL SYSTEMS PADA LANTAI TUJUH


1 PERAWATAN UMUM
a. - MASTER CONTROL NURSE CALL
1 Main Control Box 2.00 unit 19,528,540.00 39,057,080.00 Lokal
2 Nurse Host Terminal 2.00 unit 19,187,080.00 38,374,160.00 Aiphone
3 PC Software dan Data Converter 2.00 unit 34,221,700.00 68,443,400.00 Aiphone/Lokal
4 Corridor Display 23.00 unit 271,360.00 6,241,280.00 Aiphone
b. - ROOM EQUIPMENT
1 Reset Button 23.00 Buah 222,240.00 5,111,520.00 Aiphone
2 Bedside call switch 33.00 Buah 378,190.00 12,480,270.00 Aiphone
3 Ceilling Station 23.00 Buah 855,250.00 19,670,750.00 Aiphone
4 Bathroom Pullchord, Moisture-Resistant 23.00 Buah 821,050.00 18,884,150.00 Aiphone
c. - INSTALASI NURSE CALL
Instalasi Nurse Call Termasuk Testing Dan Commisioning 131.00 titik 228,280.00 29,904,680.00 Supreme
GRAND TOTAL PEKERJAAN NURSE CALL

IX INSTALASI LAN
Lantai 1
Switch hub 24 port 1.00 bh 2,682,070.00 2,682,070.00 tplink atau setara
Personal Computer 10.00 bh 6,777,950.00 67,779,500.00 intel i3 atau setara
Instalasi titik link dengan UTP Cable dlm conduit 20 mm2 10.00 titik 417,310.00 4,173,100.00 -
Outlet link 10.00 buah 186,040.00 1,860,400.00 -

Lantai 2
Switch hub 24 port 1.00 bh 2,682,070.00 2,682,070.00 tplink atau setara
Personal Computer 15.00 bh 6,777,950.00 101,669,250.00 intel i3 atau setara
Instalasi titik link dengan UTP Cable dlm conduit 20 mm2 15.00 titik 417,310.00 6,259,650.00 -
Outlet data 15.00 buah 186,040.00 2,790,600.00 -

Lantai 3
Switch hub 24 port 1.00 bh 2,682,070.00 2,682,070.00 tplink atau setara
Personal Computer 10.00 bh 6,777,950.00 67,779,500.00 intel i3 atau setara
Instalasi titik link dengan UTP Cable dlm conduit 20 mm2 10.00 titik 417,310.00 4,173,100.00 -
Outlet data 10.00 buah 186,040.00 1,860,400.00 -

Lantai 4
Switch hub 24 port 4.00 bh 2,682,070.00 10,728,280.00 tplink atau setara
Personal Computer 78.00 bh 6,777,950.00 528,680,100.00 intel i3 atau setara
Instalasi titik link dengan UTP Cable dlm conduit 20 mm2 78.00 titik 417,310.00 32,550,180.00 -
Outlet data 78.00 buah 186,040.00 14,511,120.00 -

Lantai 5
Switch hub 24 port 1.00 bh 2,682,070.00 2,682,070.00 tplink atau setara
Personal Computer 9.00 bh 6,777,950.00 61,001,550.00 intel i3 atau setara
Instalasi titik link dengan UTP Cable dlm conduit 20 mm2 9.00 titik 417,310.00 3,755,790.00 -
Outlet data 9.00 buah 186,040.00 1,674,360.00 -

Lantai 6
Switch hub 24 port 1.00 bh 2,682,070.00 2,682,070.00 tplink atau setara
Personal Computer 9.00 bh 6,777,950.00 61,001,550.00 intel i3 atau setara
Instalasi titik link dengan UTP Cable dlm conduit 20 mm2 9.00 titik 417,310.00 3,755,790.00 -
Outlet data 9.00 buah 186,040.00 1,674,360.00 -

Lantai 7
Switch hub 24 port 1.00 bh 2,682,070.00 2,682,070.00 tplink atau setara
Personal Computer 9.00 bh 6,777,950.00 61,001,550.00 intel i3 atau setara
Instalasi titik link dengan UTP Cable dlm conduit 20 mm2 9.00 titik 417,310.00 3,755,790.00 -
Outlet data 9.00 buah 186,040.00 1,674,360.00 -

Lantai Atap
Server,Pentium 4 lengkap Monitor 2.00 Unit 7,414,230.00 14,828,460.00 -
Panel UTP + Switch hub 24 port 2.00 Unit 1,762,410.00 3,524,820.00 tplink atau setara
UTP Cat 5e + PVC konduit 724.00 mt 245,910.00 178,038,840.00 Belden atau setara
Kabel Back bone VTP cat 6 204.00 mt 325,700.00 66,442,800.00 Belden atau setara
Out let data + RJ 45 20.00 Unit 121,700.00 2,434,000.00 -
Rack Panel (Walkmount rack 19") 2.00 Unit 548,140.00 1,096,280.00 -
Titik instalasi data 20.00 Titik 408,210.00 8,164,200.00 -
Testing & Commisioning 2.00 Ls 2,491,820.00 4,983,640.00 -
Switch hub 24 port 1.00 bh 2,682,070.00 2,682,070.00 tplink atau setara
Personal Computer 2.00 bh 6,777,950.00 13,555,900.00 i3 atau setara
Instalasi titik link dengan UTP Cable dlm conduit 20 mm2 2.00 titik 417,310.00 834,620.00 -
Outlet data 2.00 buah 186,040.00 372,080.00 -
GRAND TOTAL PEKERJAAN INSTALASI LAN

H PEMBANGKITAN DAYA DIESEL GENSET


Pengadaan dan pemasangan Diesel Genset, tangki BBM harian, tangki BBM bulanan, Pompa transfer BBM,
manhole tangki BBM bulanan, bak tempat pompa transfer, dudukan (pondasi) tangki BBM harian,
bak penampung drain tangki BBM, pemipaan bahan bakar, dan kelengkapan lainnya sesuia spesifikasi teknis
maupun kelengkapan standart lainnya untuk kesempurnaan operasional diesel genset.
Pengadaan dan pemasangan Diesel Genset, 1.00 unit 2,889,889,420.00 2,889,889,420.00 vman atau setara
Kapasitas 3000 kVA Prime duty, lengkap dengan
panel starter, panel kontrol, batery, dan batery
charger. Radiator, muffler, silencer, cerobong asap,
penggantung muffler dengan peredam getar,
rangka baja dudukan, bantalan peredam getar,
kelengkapan lain seperti disebutkan pada spesifikasi
teknis, dan kelengkapan standart lainnya.
Panel sinkronisasi genset sesuai gambar, lengkap dengan 2.00 unit 180,028,180.00 360,056,360.00 -
automatic main failure, automatic transfer switch,
Motorized MCCB incoming dan outgoing,
box panel, busbar, wiring, meter-meter, dll.
Tangki Bahan Bakar Minyak Harian, kapasitas 1000 liter, 2.00 unit 4,045,260.00 8,090,520.00 -
lengkap sight glass, strainer, tutup atas dengan kunci,
pompa tangan, dan kelengkapan standart lainnya..
tangki dibuat dari bahan plat besi, dua kompartemen,
cat dasar dan cat akhir warna abu-abu.
Dudukan tangki BBM harian, rangka besi siku, 2.00 unit 13,572,310.00 27,144,620.00 -
lengkap dengan tangga seperti pada gambar.
Dudukan harus kuat menopang tangki pada kondisi
terisi penuh. Cat dasar dan cat akhir warna abu-abu.
Tangki Bahan Bakar Bulanan, kapasitas 10.000 liter, 1.00 unit 55,161,450.00 55,161,450.00 -
telah diuji oleh pihak yang berwenang, lengkap dengan
- Oil stariner dan oil meter
- Pemipaan dari meter ke tangki BBM dia. 50
- Pemipaan dari meter ke titik pengisian
- Titik pengisian dari mobil tangki dengan penutup
- Pipa pemeriksa tangki
- Manhole dengan tutup dan kunci
- Foot valve / check valve
- Pipa drain dan valve drain
- Dudukan dan angkur ke pondasi
- Pondasi tangki, galian dan urugan
- kelengkapaan lainya sesuai gambar, spesifikasi teknis,
dan kelengkapan standart.
Pompa transfer BBM (Gear pump), kapasitas 56 ltr/jam 2.00 unit 19,653,300.00 39,306,600.00 -
Head 10 m, lengkap dengan :
- Gate valve input dan gate valve output dia. 25 cm
- Stainer
- Dudukan pompa
- Instalasi listrik pompa, panel starter manual/automatis
- Water level control di tangki BBM harian

Pemipaan Bahan Bakar Minyak. GIP Medium A 2.00 unit 10,101,260.00 20,202,520.00 -
Jumlah dan panjang pipa dapat berubah, disesuaikan
dengan kondisi lapangan dan bentuk tangki yang dipilih.
a. GIP dia. 20
b. GIP dia. 25
c. GIP dia. 40
d. GIP dia. 50
e. Check Valve dia. 25
f. Gate Valve dia. 20
g. Gate Valve dia. 50
h. Air release Valve dia. 40
Pondasi beton tangki BBM bulanan, 1.00 unit 13,572,310.00 13,572,310.00 -
Bak penampung drain BBM.
Box pompa transfer, pasangan bata diplester cat tembok, 1.00 unit 2,265,430.00 2,265,430.00 -
tutup bok dari plat besi rangka besi siku di cat,
lengkap dengan engsel dan kunci
Grill intake dan grill exhaust, acoustic louvre, ukuran 2.00 ls 5,516,700.00 11,033,400.00 -
sesuai gambar, rangka dan dudukan ke tombok.
Exhaust fan 900 cfm, lengkap dengan contactor, 4.00 unit 7,014,630.00 28,058,520.00 -
on/off push button, tombol manual/auto, dan instalasi.
Box container peredam suara, lapisan glasswoll 1 inch, ram 2.00 unit 352,480.00 704,960.00 -
kawat, kain kasa penutup, dan kelengkapan lainnya.
Rak kabel horizontal dan vertikal dari genset ke PCG 2.00 ls 505,520.00 1,011,040.00 -
a. Lebar 40 cm (vertikal)
b. Lebar 40 cm (horizontal)
Kabel dari genset ke Panel Kontrol genset 16.00 m 12,465,240.00 199,443,840.00 LMK standard
4 x NYA 240 mm2 + NYA 150 mm2
Testing dan commisioning 2.00 ls 1,048,140.00 2,096,280.00 -
Maintenance tool standart 2.00 ls 1,568,760.00 3,137,520.00 -
Pengisian BBM pertama di tangki bulanan dan harian. 8,400.00 ltr 8,550.00 71,820,000.00 -
Traning operasi dan pemeliharaan 2 orang teknisi. 2.00 ls 3,716,790.00 7,433,580.00 -

Isolasi Ruang genset (Rock wool dencity 100 Kg/m3, 1.00 ls 178,049,810.00 178,049,810.00 Yudistira atau setara
tebal 50 mm, incl. spindle pin, glass cloth, kawat locket / ram
Intake Sound Attenuator ( 3500x2000x2000 ) mm
Discharge Sound Attenuator (3000x2000x2000) mm
GRAND TOTAL PEMBANGKITAN DAYA DIESEL GENSET

I PEMIPAAN AIR BERSIH, AIR BUANGAN, DAN AIR KOTOR


I RUANG POMPA, RESERVOIR, TANGKI ATAS DAN PEMIPAANNYA
SEPTIC TANK, SUMPIT, DAN BAK KONTROL

Sambungan Air PDAM - Reservoir - Tangki atas


Pengadaan dan pemasangan pipa, Pompa distribusi air bersih,
tanki atas (roof tank). Lengkap dengan
Gate valve, check valve, foot valve, floating valve, drain, dan alat
bantu pemipaan yang diperlukan, pengecatan pipa, flushing dan pengujian
Termasuk fitting, sambungan, flange, Tee, knee dan kelengkapan lainya.
• Gate valve ø 50 mm 2.00 Bh 1,545,580.00 3,091,160.00 -
• Meter air ø 50 mm, boks, dan dudukan 2.00 Bh 1,782,600.00 3,565,200.00 -
• Pipa dari meter air ke reservoir, GSP ø 50 mm 100.00 m 149,210.00 14,921,000.00 -
• Galian tanah, pelindung pipa. 100.00 m 9,220.00 922,000.00 -
• Foating valve untuk pipa masuk PDAM, ø 50 mm 2.00 Bh 120,820.00 241,640.00 -
• Pompa angkat air bersih, head 50 m, kap. min 260 ltr/mnt 2.00 Bh 36,029,430.00 72,058,860.00 -
1,5 kW, 3 fasa. Lengkap dengan dudukan.
• Pompa booster set (roof), head 20 m, kap. min 100 ltr/mnt 1.00 set 164,123,470.00 164,123,470.00 Ebara/Shanghai Kaiquan atau setara
1 set 3 pompa
• Pemipaan air bersih di R. Pompa
Header intake GSP ø 100mm 2.00 set 450,020.00 900,040.00 -
Header discharge GSP ø 100mm 2.00 set 450,020.00 900,040.00 -
Gate valve intake ø 50 mm 8.00 bh 1,545,580.00 12,364,640.00 -
Check valve ø 50 mm 4.00 bh 1,285,490.00 5,141,960.00 -
Strainer ø 50 mm 4.00 bh 2,583,820.00 10,335,280.00 -
Flexible joint ø 50 mm 4.00 bh 729,470.00 2,917,880.00 -
Flange, alat bantu, dan pemipaan dari FV ke Header 4.00 set 729,470.00 2,917,880.00 -
Gate valve discharge ø 50 mm 2.00 bh 1,545,580.00 3,091,160.00 -
• Water level control (WLC) type elektrode 4.00 set 800,130.00 3,200,520.00 -
• Instalasi kabel daya dari Panel listrik ke pompa 16.00 m 55,080.00 881,280.00 -
• Instalasi kabel elektrode NYMHY 2x1,5mm2 24.00 m 6,240.00 149,760.00 -
• Pipa dari reservoir ke tangki air, GSP ø 50 mm 150.00 m 148,690.00 22,303,500.00 -
melalui shaft, termasuk klem pipa
• galian tanah dan pelindung pipa 150.00 m 9,210.00 1,381,500.00 -
• Pemipaan kran siram taman, GSP ø 20 mm 120.00 m 69,600.00 8,352,000.00 -
• galian tanah dan pelindung pipa 120.00 m 9,210.00 1,105,200.00 -
• Kran siram taman dia 20mm, termasuk pemasangan 10.00 titik 198,430.00 1,984,300.00 -
kran di dinding
• Pembersihan (flushing dan disinfektan) dan pengujian 2.00 ls 921,080.00 1,842,160.00 -
hidrostatic jaringan air bersih gedung
• Testing dan commissioning peralatan dan jaringan 2.00 ls 3,171,280.00 6,342,560.00 -
air bersih

• Pompa Sumpit, head 20 m, kap. min 300 ltr/mnt 2.00 set 67,956,130.00 135,912,260.00 Ebara/Shanghai Kaiquan atau setara
1,5 kW, 3 fasa. Lengkap dengan dudukan.

• STP Domestic kap. 80 M3/day incl. sistem, Pondasi & Acc 1.00 set 585,576,890.00 585,576,890.00 -
1,5 kW, 3 fasa. Lengkap dengan dudukan.

• STP Limbah kap. 80 M3/day incl. sistem, Pondasi & Acc 1.00 set 999,415,710.00 999,415,710.00 -
1,5 kW, 3 fasa. Lengkap dengan dudukan.

• Bak kontrol uk. (60 x 60 x 65) cm 25.00 unit 998,650.00 24,966,250.00 -

II PEMIPAAN AIR BERSIH, AIR BUANGAN, DAN AIR KOTOR ( HALAMAN DAN SEMUA LANTAI )
Air Kotor dan Air Bekas , Halaman
Pengadaan dan pemasangan pipa penyalur air kotor, air bekas
dan pipa ventilasi.Pipa PVC klas AW (10 kg/cm2). Termasuk
fiting, tee, elbow, reducer dll
Air Limbah
• GSP medium ø 50 mm 25.00 m 149,600.00 3,740,000.00 -
• GSP medium ø 100 mm 70.00 m 448,000.00 31,360,000.00 -
Air Kotor
• PVC AW ø 100 mm 70.00 m 146,540.00 10,257,800.00 Wavin atau setara
• PVC AW ø 150 mm 50.00 m 291,260.00 14,563,000.00 Wavin atau setara
Air Buangan
• PVC AW ø 50 mm 35.00 m 54,130.00 1,894,550.00 Wavin atau setara
• PVC AW ø 100 mm 50.00 m 146,540.00 7,327,000.00 Wavin atau setara
• PVC AW ø 150 mm 50.00 m 291,260.00 14,563,000.00 Wavin atau setara

Pemipaan Toilet, Lantai 1


Air Bersih
(termasuk Pemipaan di shaft)
Pengadaan dan pemasangan pipa distribusi air bersih,menggunakan PPR dan GSP
Di bagian terbuka, pipa dicat warna biru.(GSP) incl. fitting & acc
• PPR ø 15 mm (PN 10) 140.00 m 59,200.00 8,288,000.00 -
• PPR ø 20 mm (PN 10) 155.00 m 76,260.00 11,820,300.00 -
• PPR ø 25 mm (PN 10) 25.00 m 110,630.00 2,765,750.00 -
• PPR ø 32 mm (PN 10) 50.00 m 170,410.00 8,520,500.00 -
• PPR ø 40 mm (PN 10) 35.00 m 272,370.00 9,532,950.00 -
• PPR ø 50 mm (PN 10) 40.00 m 396,410.00 15,856,400.00 -
• PPR ø 65 mm (PN 10) 30.00 m 480,790.00 14,423,700.00 -
• GSP ø 65 mm (RISER) 5.00 m 238,830.00 1,194,150.00 -
• Gate valve ø 65 mm 3.00 bh 1,912,530.00 5,737,590.00 -

Air Kotor, Buangan dan Vent


Pengadaan dan pemasangan pipa penyalur air kotor, air bekas
dan pipa ventilasi.Pipa PVC klas AW (10 kg/cm2).Termasuk
fiting, tee, elbow, reducer dll. Serta peralatan lain ceperti Clean
Out dan Floor Drain
Lengkap dengan accessories seperti yang disyaratkan.
Air Kotor
• PVC AW ø 50 mm 5.00 m 55,640.00 278,200.00 Wavin atau setara
• PVC AW ø 100 mm 125.00 m 137,750.00 17,218,750.00 Wavin atau setara
• PVC AW ø 150 mm 25.00 m 271,270.00 6,781,750.00 Wavin atau setara
• PVC AW ø 150 mm, RISER 5.00 m 271,270.00 1,356,350.00 Wavin atau setara
• Clean Out (CO) ø 100 mm 12.00 bh 938,360.00 11,260,320.00 -
Air Buangan
• PVC AW ø 50 mm 120.00 m 55,640.00 6,676,800.00 Wavin atau setara
• PVC AW ø 80 mm 30.00 m 126,900.00 3,807,000.00 Wavin atau setara
• PVC AW ø 100 mm 25.00 m 137,750.00 3,443,750.00 Wavin atau setara
• PVC AW ø 150 mm 25.00 m 271,270.00 6,781,750.00 Wavin atau setara
• PVC AW ø 150 mm, RISER 5.00 m 271,270.00 1,356,350.00 Wavin atau setara
• Clean Out (CO) ø 50 mm 10.00 bh 342,580.00 3,425,800.00 -
Air Limbah
• GSP medium ø 50 mm 5.00 m 186,080.00 930,400.00 -
• GSP medium ø 100 mm 75.00 m 415,140.00 31,135,500.00 -
• GSP medium ø 100 mm, RISER 5.00 m 415,140.00 2,075,700.00 -
Pipa Vent
• PVC AW ø 32 mm 40.00 m 37,650.00 1,506,000.00 Wavin atau setara
• PVC AW ø 40 mm 25.00 m 39,040.00 976,000.00 Wavin atau setara
• PVC AW ø 100 mm, RISER 5.00 m 137,910.00 689,550.00 Wavin atau setara

Pemipaan Toilet, Lantai 2


Air Bersih
• PPR ø 15 mm (PN 10) 80.00 m 59,200.00 4,736,000.00 -
• PPR ø 20 mm (PN 10) 150.00 m 76,260.00 11,439,000.00 -
• PPR ø 25 mm (PN 10) 5.00 m 110,630.00 553,150.00 -
• PPR ø 32 mm (PN 10) 40.00 m 170,410.00 6,816,400.00 -
• PPR ø 40 mm (PN 10) 40.00 m 272,370.00 10,894,800.00 -
• PPR ø 50 mm (PN 10) 40.00 m 396,410.00 15,856,400.00 -
• PPR ø 65 mm (PN 10) 5.00 m 480,790.00 2,403,950.00 -
• GSP ø 65 mm (RISER) 5.00 m 238,830.00 1,194,150.00 -
• Gate valve ø 50 mm 3.00 bh 1,523,540.00 4,570,620.00 -

Air Kotor
• PVC AW ø 50 mm 10.00 m 55,640.00 556,400.00 Wavin atau setara
• PVC AW ø 80 mm 5.00 m 126,900.00 634,500.00 Wavin atau setara
• PVC AW ø 100 mm 85.00 m 137,750.00 11,708,750.00 Wavin atau setara
• PVC AW ø 150 mm, RISER 5.00 m 271,270.00 1,356,350.00 Wavin atau setara
• Clean Out (CO) ø 100 mm 11.00 bh 939,210.00 10,331,310.00 -
Air Buangan
• PVC AW ø 50 mm 135.00 m 55,640.00 7,511,400.00 Wavin atau setara
• PVC AW ø 80 mm 5.00 m 126,900.00 634,500.00 Wavin atau setara
• PVC AW ø 100 mm 10.00 m 137,750.00 1,377,500.00 Wavin atau setara
• PVC AW ø 150 mm, RISER 5.00 m 271,270.00 1,356,350.00 Wavin atau setara
• Clean Out (CO) ø 50 mm 10.00 bh 342,580.00 3,425,800.00 -
Air Limbah
• GSP medium ø 100 mm 70.00 m 415,140.00 29,059,800.00 -
• GSP medium ø 100 mm, RISER 5.00 m 415,140.00 2,075,700.00 -
Pipa Vent
• PVC AW ø 32 mm 40.00 m 37,650.00 1,506,000.00 Wavin atau setara
• PVC AW ø 40 mm 25.00 m 39,040.00 976,000.00 Wavin atau setara
• PVC AW ø 100 mm, RISER 5.00 m 137,910.00 689,550.00 Wavin atau setara

Pemipaan Toilet Lantai 3


Air Bersih
• PPR ø 15 mm (PN 10) 95.00 m 59,200.00 5,624,000.00 -
• PPR ø 20 mm (PN 10) 110.00 m 76,260.00 8,388,600.00 -
• PPR ø 25 mm (PN 10) 55.00 m 110,630.00 6,084,650.00 -
• PPR ø 32 mm (PN 10) 65.00 m 170,410.00 11,076,650.00 -
• PPR ø 40 mm (PN 10) 60.00 m 272,370.00 16,342,200.00 -
• PPR ø 50 mm (PN 10) 40.00 m 396,410.00 15,856,400.00 -
• PPR ø 65 mm (PN 10) 8.00 m 480,790.00 3,846,320.00 -
• GSP ø 65 mm (RISER) 5.00 m 238,830.00 1,194,150.00 -
• Gate valve ø 50 mm 3.00 bh 1,523,540.00 4,570,620.00 -
Air Kotor
• PVC AW ø 50 mm 5.00 m 55,640.00 278,200.00 Wavin atau setara
• PVC AW ø 100 mm 160.00 m 137,750.00 22,040,000.00 Wavin atau setara
• PVC AW ø 150 mm, RISER 5.00 m 271,270.00 1,356,350.00 Wavin atau setara
• Clean Out (CO) ø 100 mm 10.00 bh 939,210.00 9,392,100.00 -
Air Buangan
• PVC AW ø 50 mm 130.00 m 55,640.00 7,233,200.00 Wavin atau setara
• PVC AW ø 80 mm 90.00 m 126,900.00 11,421,000.00 Wavin atau setara
• PVC AW ø 100 mm 10.00 m 137,750.00 1,377,500.00 Wavin atau setara
• PVC AW ø 150 mm, RISER 5.00 m 271,270.00 1,356,350.00 Wavin atau setara
• Clean Out (CO) ø 50 mm 10.00 bh 342,580.00 3,425,800.00 -
Air Limbah
• GSP medium ø 50 mm 15.00 m 186,080.00 2,791,200.00 -
• GSP medium ø 100 mm 120.00 m 415,140.00 49,816,800.00 -
• GSP medium ø 100 mm, RISER 5.00 m 415,140.00 2,075,700.00 -
Pipa Vent
• PVC AW ø 32 mm 40.00 m 37,650.00 1,506,000.00 Wavin atau setara
• PVC AW ø 40 mm 25.00 m 39,040.00 976,000.00 Wavin atau setara
• PVC AW ø 100 mm, RISER 5.00 m 137,910.00 689,550.00 Wavin atau setara

Pemipaan Toilet Lantai 4


Air Bersih
• PPR ø 15 mm (PN 10) 95.00 m 59,200.00 5,624,000.00 -
• PPR ø 20 mm (PN 10) 30.00 m 76,260.00 2,287,800.00 -
• PPR ø 25 mm (PN 10) 5.00 m 110,630.00 553,150.00 -
• PPR ø 40 mm (PN 10) 5.00 m 272,370.00 1,361,850.00 -
• PPR ø 50 mm (PN 10) 3.00 m 396,410.00 1,189,230.00 -
• GSP ø 65 mm (RISER) 5.00 m 237,290.00 1,186,450.00 -
• Gate valve ø 15 mm 2.00 bh 315,940.00 631,880.00 -
• Gate valve ø 50 mm 1.00 bh 1,523,540.00 1,523,540.00 -

Air Kotor
• PVC AW ø 50 mm 5.00 m 55,640.00 278,200.00 Wavin atau setara
• PVC AW ø 80 mm 10.00 m 126,900.00 1,269,000.00 Wavin atau setara
• PVC AW ø 100 mm 20.00 m 137,750.00 2,755,000.00 Wavin atau setara
• PVC AW ø 150 mm, RISER 5.00 m 271,270.00 1,356,350.00 Wavin atau setara
• Clean Out (CO) ø 100 mm 5.00 bh 939,210.00 4,696,050.00 -
Air Buangan
• PVC AW ø 50 mm 115.00 m 55,640.00 6,398,600.00 Wavin atau setara
• PVC AW ø 80 mm 5.00 m 126,900.00 634,500.00 Wavin atau setara
• PVC AW ø 100 mm 5.00 m 137,750.00 688,750.00 Wavin atau setara
• PVC AW ø 150 mm, RISER 5.00 m 271,270.00 1,356,350.00 Wavin atau setara
• Clean Out (CO) ø 50 mm 6.00 bh 342,580.00 2,055,480.00 -
Pipa Vent
• PVC AW ø 32 mm 40.00 m 37,650.00 1,506,000.00 Wavin atau setara
• PVC AW ø 40 mm 25.00 m 39,040.00 976,000.00 Wavin atau setara
• PVC AW ø 100 mm, RISER 5.00 m 137,910.00 689,550.00 Wavin atau setara

Pemipaan Toilet Lantai 5


Air Bersih
• PPR ø 15 mm (PN 10) 215.00 m 59,200.00 12,728,000.00 -
• PPR ø 20 mm (PN 10) 135.00 m 76,260.00 10,295,100.00 -
• PPR ø 25 mm (PN 10) 35.00 m 110,630.00 3,872,050.00 -
• PPR ø 40 mm (PN 10) 15.00 m 272,370.00 4,085,550.00 -
• PPR ø 50 mm (PN 10) 5.00 m 396,410.00 1,982,050.00 -
• PPR ø 15 mm (PN 20) 35.00 m 78,670.00 2,753,450.00 -
• PPR ø 20 mm (PN 20) 20.00 m 118,640.00 2,372,800.00 -
• GSP ø 65 mm (RISER) 85.00 m 238,830.00 20,300,550.00 -
• Gate valve ø 15 mm 2.00 bh 317,850.00 635,700.00 -
• Gate valve ø 20 mm 6.00 bh 385,190.00 2,311,140.00 -
• Gate valve ø 25 mm 5.00 bh 502,770.00 2,513,850.00 -
• Gate valve ø 40 mm 2.00 bh 795,260.00 1,590,520.00 -
• Gate valve ø 50 mm 1.00 bh 1,523,540.00 1,523,540.00 -

Air Kotor
• PVC AW ø 50 mm 10.00 m 55,640.00 556,400.00 Wavin atau setara
• PVC AW ø 100 mm 235.00 m 137,750.00 32,371,250.00 Wavin atau setara
• PVC AW ø 100 mm, RISER 40.00 m 137,750.00 5,510,000.00 Wavin atau setara
• PVC AW ø 150 mm, RISER 5.00 m 271,270.00 1,356,350.00 Wavin atau setara
• Clean Out (CO) ø 100 mm 20.00 bh 939,210.00 18,784,200.00 -
Air Buangan
• PVC AW ø 50 mm 157.00 m 55,640.00 8,735,480.00 Wavin atau setara
• PVC AW ø 80 mm 15.00 m 126,900.00 1,903,500.00 Wavin atau setara
• PVC AW ø 100 mm 120.00 m 137,750.00 16,530,000.00 Wavin atau setara
• PVC AW ø 100 mm, RISER 40.00 m 137,750.00 5,510,000.00 Wavin atau setara
• PVC AW ø 150 mm, RISER 5.00 m 271,270.00 1,356,350.00 Wavin atau setara
• Clean Out (CO) ø 50 mm 20.00 bh 342,580.00 6,851,600.00 -
Pipa Vent
• PVC AW ø 32 mm 176.00 m 37,650.00 6,626,400.00 Wavin atau setara
• PVC AW ø 40 mm 60.00 m 39,040.00 2,342,400.00 Wavin atau setara
• PVC AW ø 50 mm, RISER 40.00 m 55,640.00 2,225,600.00 Wavin atau setara
• PVC AW ø 100 mm, RISER 5.00 m 137,790.00 688,950.00 Wavin atau setara

Pemipaan Toilet Lantai 6


Air Bersih
• PPR ø 15 mm (PN 10) 215.00 m 59,200.00 12,728,000.00 -
• PPR ø 20 mm (PN 10) 135.00 m 76,260.00 10,295,100.00 -
• PPR ø 25 mm (PN 10) 35.00 m 110,630.00 3,872,050.00 -
• PPR ø 40 mm (PN 10) 15.00 m 272,370.00 4,085,550.00 -
• PPR ø 50 mm (PN 10) 5.00 m 396,410.00 1,982,050.00 -
• PPR ø 15 mm (PN 20) 35.00 m 78,670.00 2,753,450.00 -
• PPR ø 20 mm (PN 20) 20.00 m 118,640.00 2,372,800.00 -
• GSP ø 65 mm (RISER) 85.00 m 238,830.00 20,300,550.00 -
• Gate valve ø 15 mm 2.00 bh 317,850.00 635,700.00 -
• Gate valve ø 20 mm 6.00 bh 385,190.00 2,311,140.00 -
• Gate valve ø 25 mm 5.00 bh 502,770.00 2,513,850.00 -
• Gate valve ø 40 mm 2.00 bh 795,260.00 1,590,520.00 -
• Gate valve ø 50 mm 1.00 bh 1,523,540.00 1,523,540.00 -

Air Kotor
• PVC AW ø 50 mm 10.00 m 55,640.00 556,400.00 Wavin atau setara
• PVC AW ø 80 mm 5.00 m 126,900.00 634,500.00 Wavin atau setara
• PVC AW ø 100 mm 105.00 m 137,750.00 14,463,750.00 Wavin atau setara
• PVC AW ø 100 mm, RISER 40.00 m 137,750.00 5,510,000.00 Wavin atau setara
• PVC AW ø 150 mm, RISER 5.00 m 271,270.00 1,356,350.00 Wavin atau setara
• Clean Out (CO) ø 100 mm 20.00 bh 939,210.00 18,784,200.00 -
Air Buangan
• PVC AW ø 50 mm 157.00 m 55,640.00 8,735,480.00 Wavin atau setara
• PVC AW ø 80 mm 15.00 m 126,900.00 1,903,500.00 Wavin atau setara
• PVC AW ø 100 mm 5.00 m 137,750.00 688,750.00 Wavin atau setara
• PVC AW ø 100 mm, RISER 40.00 m 137,750.00 5,510,000.00 Wavin atau setara
• PVC AW ø 150 mm, RISER 5.00 m 271,270.00 1,356,350.00 Wavin atau setara
• Clean Out (CO) ø 50 mm 20.00 bh 342,580.00 6,851,600.00 -
Pipa Vent
• PVC AW ø 32 mm 175.00 m 37,650.00 6,588,750.00 Wavin atau setara
• PVC AW ø 40 mm 60.00 m 39,040.00 2,342,400.00 Wavin atau setara
• PVC AW ø 50 mm, RISER 40.00 m 55,640.00 2,225,600.00 Wavin atau setara
• PVC AW ø 100 mm, RISER 5.00 m 137,790.00 688,950.00 Wavin atau setara

Pemipaan Toilet Lantai 7


Air Bersih
• PPR ø 15 mm (PN 10) 205.00 m 59,200.00 12,136,000.00 -
• PPR ø 20 mm (PN 10) 155.00 m 76,260.00 11,820,300.00 -
• PPR ø 25 mm (PN 10) 60.00 m 110,630.00 6,637,800.00 -
• PPR ø 40 mm (PN 10) 25.00 m 272,370.00 6,809,250.00 -
• PPR ø 50 mm (PN 10) 15.00 m 396,410.00 5,946,150.00 -
• PPR ø 65 mm (PN 10) 165.00 m 486,820.00 80,325,300.00 -
• PPR ø 80 mm (PN 10) 55.00 m 616,450.00 33,904,750.00 -
• PPR ø 100 mm (PN 10) 70.00 m 823,800.00 57,666,000.00 -
• PPR ø 15 mm (PN 20) 135.00 m 78,670.00 10,620,450.00 -
• PPR ø 20 mm (PN 20) 50.00 m 118,640.00 5,932,000.00 -
• PPR ø 25 mm (PN 20) 10.00 m 178,330.00 1,783,300.00 -
• GSP ø 65 mm (RISER) 160.00 m 238,830.00 38,212,800.00 -
• Gate valve ø 20 mm 3.00 bh 386,620.00 1,159,860.00 -
• Gate valve ø 25 mm 4.00 bh 502,750.00 2,011,000.00 -
• Gate valve ø 40 mm 4.00 bh 795,270.00 3,181,080.00 -
• Gate valve ø 50 mm 7.00 bh 1,523,610.00 10,665,270.00 -
• Gate valve ø 100 mm 4.00 bh 3,344,030.00 13,376,120.00 -

Air Kotor
• PVC AW ø 50 mm 10.00 m 55,640.00 556,400.00 Wavin atau setara
• PVC AW ø 80 mm 5.00 m 126,900.00 634,500.00 Wavin atau setara
• PVC AW ø 100 mm 170.00 m 137,750.00 23,417,500.00 Wavin atau setara
• PVC AW ø 100 mm, RISER 40.00 m 137,750.00 5,510,000.00 Wavin atau setara
• PVC AW ø 150 mm, RISER 5.00 m 271,270.00 1,356,350.00 Wavin atau setara
• Clean Out (CO) ø 100 mm 20.00 bh 939,210.00 18,784,200.00 -
Air Buangan
• PVC AW ø 50 mm 210.00 m 55,640.00 11,684,400.00 Wavin atau setara
• PVC AW ø 80 mm 25.00 m 126,900.00 3,172,500.00 Wavin atau setara
• PVC AW ø 100 mm 10.00 m 137,750.00 1,377,500.00 Wavin atau setara
• PVC AW ø 100 mm, RISER 40.00 m 137,750.00 5,510,000.00 Wavin atau setara
• PVC AW ø 150 mm, RISER 5.00 m 271,270.00 1,356,350.00 Wavin atau setara
• Clean Out (CO) ø 50 mm 20.00 bh 342,580.00 6,851,600.00 -
Pipa Vent
• PVC AW ø 32 mm 155.00 m 37,650.00 5,835,750.00 Wavin atau setara
• PVC AW ø 40 mm 90.00 m 39,040.00 3,513,600.00 Wavin atau setara
• PVC AW ø 50 mm 120.00 m 55,640.00 6,676,800.00 Wavin atau setara
• PVC AW ø 80 mm 25.00 m 126,900.00 3,172,500.00 Wavin atau setara
• PVC AW ø 100 mm 10.00 m 137,750.00 1,377,500.00 Wavin atau setara
• PVC AW ø 100 mm, RISER 5.00 m 137,750.00 688,750.00 Wavin atau setara
• PVC AW ø 50 mm, RISER 40.00 m 55,640.00 2,225,600.00 Wavin atau setara

Pemipaan Toilet Lantai Atap


Air Bersih
• PPR ø 15 mm (PN 10) 60.00 m 59,200.00 3,552,000.00 -
• PPR ø 20 mm (PN 10) 60.00 m 76,260.00 4,575,600.00 -
• PPR ø 25 mm (PN 10) 56.00 m 110,630.00 6,195,280.00 -
• PPR ø 32 mm (PN 10) 5.00 m 172,390.00 861,950.00 -
• PPR ø 40 mm (PN 10) 25.00 m 272,370.00 6,809,250.00 -
• PPR ø 50 mm (PN 10) 25.00 m 396,410.00 9,910,250.00 -
• PPR ø 100 mm (PN 10) 150.00 m 823,800.00 123,570,000.00 -
• PPR ø 15 mm (PN 20) 110.00 m 78,670.00 8,653,700.00 -
• PPR ø 50 mm (PN 20) 30.00 m 638,760.00 19,162,800.00 -
• PPR ø 65 mm (PN 20) 150.00 m 789,610.00 118,441,500.00 -
• GSP ø 65 mm (RISER) 20.00 m 238,830.00 4,776,600.00 -
• Gate valve ø 50 mm 7.00 bh 1,523,610.00 10,665,270.00 -
• Gate valve ø 65 mm 1.00 bh 1,904,000.00 1,904,000.00 -

Air Kotor
• PVC AW ø 50 mm 5.00 m 55,640.00 278,200.00 Wavin atau setara
• PVC AW ø 80 mm 5.00 m 126,900.00 634,500.00 Wavin atau setara
• PVC AW ø 100 mm 95.00 m 137,750.00 13,086,250.00 Wavin atau setara
• PVC AW ø 150 mm, RISER 5.00 m 271,270.00 1,356,350.00 Wavin atau setara
• Clean Out (CO) ø 100 mm 8.00 bh 939,210.00 7,513,680.00 -
Air Buangan
• PVC AW ø 50 mm 100.00 m 55,640.00 5,564,000.00 Wavin atau setara
• PVC AW ø 80 mm 5.00 m 126,900.00 634,500.00 Wavin atau setara
• PVC AW ø 100 mm 5.00 m 137,750.00 688,750.00 Wavin atau setara
• PVC AW ø 150 mm, RISER 5.00 m 271,270.00 1,356,350.00 Wavin atau setara
• Clean Out (CO) ø 50 mm 8.00 bh 342,580.00 2,740,640.00 -
Pipa Vent
• PVC AW ø 32 mm 40.00 m 37,650.00 1,506,000.00 Wavin atau setara
• PVC AW ø 40 mm 45.00 m 39,040.00 1,756,800.00 Wavin atau setara
• PVC AW ø 100 mm, RISER 5.00 m 137,750.00 688,750.00 Wavin atau setara

Sistem Air Panas


1 Heat Pump (AW-21) 3.00 unit 105,132,320.00 315,396,960.00 -
Heating Capacity : 20,8 kw
Power Input : 5,2 kw
Net Weight : 165 Kg
Net Dimensions (LxWxH) : 800x800x1.120 mm
Rated Outlet Water Temp
55o C

2 Inlet Heat Pump 2.00 unit 35,059,570.00 70,119,140.00 Ebarra/HiCop/Shangai Kaiquan atau setara
Type
Temperature : 90 0C
Kapasitas : 83 liter/m
Head : 10 m

3 Storage tank 3000 L 2.00 unit 59,575,880.00 119,151,760.00 -

4 Inlet Storage tank pump


Type 2.00 unit 35,458,950.00 70,917,900.00 Ebarra/HiCop/Shangai Kaiquan atau setara
Temperature : 90 0C
Kapasitas : 30 liter/m
Head : 10 m

5 Recirculation Pump 2.00 unit 38,319,780.00 76,639,560.00 Ebarra/HiCop/Shangai Kaiquan atau setara
Type
Temperature 90 0C
Kapasitas 100 liter/m
Head 30 m

6 Instalasi 1.00 lot 19,801,260.00 19,801,260.00 -

7 Electrical Panel control 1.00 unit 13,728,470.00 13,728,470.00 -

8 Valve (Class 125 psi) & Accessories 1.00 lot 21,508,450.00 21,508,450.00 -
Gate valve
Check valve
Strainer (Y-Type)
Pressure gauge

9 Pipa Air Panas (PPR PN-20, incl.accessories, hanger&braket)


PPR ø 50 mm 25.00 m 638,760.00 15,969,000.00 -
PPR ø 65 mm 30.00 m 789,610.00 23,688,300.00 -

Pemipaan Talang Air Hujan


Pemasangan roof drain, berikut, bobokan, sealant, sambungan, perapihan.
Pemasangan pipa tegak, klem, elbow, dan peralatan bantu.
• Roof drain ø 100 mm, CAST IRON. 26.00 bh 257,980.00 6,707,480.00 -
• PVC AW ø 100 mm 200.00 m 137,750.00 27,550,000.00 -
• PVC AW ø 150 mm 30.00 m 271,270.00 8,138,100.00 -
GRAND TOTAL PEMIPAAN AIR BERSIH, AIR BUANGAN, DAN AIR KOTOR

J PEKERJAAN PEMADAM KEBAKARAN HYDRANT DAN SPRINKLER

Pompa Pemadam Kebakaran & Peralatan di R. Pompa


Pompa Listrik 1.00 unit 548,463,140.00 548,463,140.00 Ebarra/Shangai Kaiquan atau setara
Type : Horizontal splitcase fire pump
Kapasitas : 2839 liter/menit, Head : 120 meter
Pompa Diesel 1.00 unit 836,029,850.00 836,029,850.00 Ebarra/Shangai Kaiquan atau setara
Type : Horizontal splitcase fire pump
Kapasitas : 2839 liter/menit, Head : 120 meter
Pompa Jockey 1.00 unit 50,897,060.00 50,897,060.00 Ebarra/Shangai Kaiquan atau setara
- Type : Vertical Multistage Fire Pump
Kapasitas : 57 liter/menit, Head : 130 meter
Perlengkapan :
Valve menggunakan type 20 kg/cm2
- Pipa BS schedule 40 ø 100 mm 48.00 m 476,750.00 22,884,000.00 -
- Pipa BS schedule 40 ø 50 mm 12.00 m 183,510.00 2,202,120.00 -
- Gate Valve ø 150 mm 2.00 bh 35,285,690.00 70,571,380.00 -
- Gate Valve ø 100 mm 14.00 bh 18,378,490.00 257,298,860.00 -
- Gate Valve ø 50 mm 4.00 bh 8,728,010.00 34,912,040.00 -
- Check Valve ø 100 mm 4.00 bh 4,480,520.00 17,922,080.00 -
- Check Valve ø 50 mm 2.00 bh 1,013,480.00 2,026,960.00 -
- Strainer ø 150 mm 4.00 bh 6,467,310.00 25,869,240.00 -
- Strainer ø 50 mm 2.00 bh 4,152,390.00 8,304,780.00 -
- Foot Valve ø 100 mm 4.00 bh 3,964,600.00 15,858,400.00 -
- Air Realese Valve ø 25 mm 2.00 bh 3,176,650.00 6,353,300.00 -
- Pressure gauge, pressuare switch, manometer, kabel 2.00 bh 494,440.00 988,880.00 -
- Pressure relief valve hydrant 2.00 bh 739,630.00 1,479,260.00 -
- Pressure relief valve sprinkler 2.00 bh 739,630.00 1,479,260.00 -
- Fitting & assecories 2.00 ls 676,530.00 1,353,060.00 -
- Pipa header BS schedule 40 ø 200 mm 4.00 bh 1,357,130.00 5,428,520.00 -
- Pipa-pipa sparing 2.00 set 732,440.00 1,464,880.00 -
Air Release valve (ARV) dia. 50 2.00 bh 7,560,580.00 15,121,160.00 -
Testing & Commisioning 1.00 ls 3,164,760.00 3,164,760.00 -

Pemipaan Pemadam Kebakaran di Halaman


Pemipaan
Pipa BS schedule 40 ø 150 mm 300.00 m 801,870.00 240,561,000.00 -
Pipa BS schedule 40 ø 100 mm 115.00 m 476,750.00 54,826,250.00 -
Galian tanAH untuk pipa 415.00 m 9,150.00 3,797,250.00 -
Siamese conection 2.00 unit 3,338,420.00 6,676,840.00 hooseki atau setara
FHC Outdoor : 5.00 set 7,205,160.00 36,025,800.00 hooseki atau setara
-Hydrant box 125 X 75 X 18 cm ( 1Bh)
-Fire hose 2.5" X 30 M (Rooll)
-Hydrant Valve 2.5" (1 Bh)
-Seamless Nozzle 2.5" (1 Bh)
-Hose rack 2.5" (1 Bh)
-Dudukan dan pondasi
Pilar Hydrant, lengkap pondasi 5.00 set 4,744,570.00 23,722,850.00 hooseki atau setara
Gate Valve 100 mm (pillar hydrant) 7.00 unit 18,378,490.00 128,649,430.00 -
Check Valve 150 mm (siamese connection) 2.00 unit 4,480,520.00 8,961,040.00 -
Bak Kontrol valve 7.00 bh 664,550.00 4,651,850.00 -

Pemipaan Pemadam Kebakaran Lantai 1,


Hydrant
Pemipaan
Pipa BS schedule 40 ø 150 mm (vertikal di shaft) 5.00 m 801,870.00 4,009,350.00 -
Pipa BS schedule 40 ø 80 mm 5.00 m 344,770.00 1,723,850.00 -
Pipa BS schedule 40 ø 65 mm 95.00 m 268,350.00 25,493,250.00 -
Pipa BS schedule 40 ø 40 mm 2.00 m 152,510.00 305,020.00 -
FHC Indoor : 2.00 set 7,321,520.00 14,643,040.00 hooseki atau setara
-Hydrant box 125 X 75 X 18 cm ( 1Bh)
-Fire hose 1.5" X 30 M (Rooll)
-Hydrant Valve 2.5" (1 Bh)
-Hydrant Valve 1.5" (1 Bh)
-Seamless Nozzle 1.5" (1 Bh)
-Hose rack 1.5" (1 Bh)
Gate Valve 80 mm (di shaft, 1.00 unit 13,613,170.00 13,613,170.00 -
Sprinkler
Pemipaan
Pipa BS schedule 40 ø 25 mm 230.00 m 92,370.00 21,245,100.00 -
Pipa BS schedule 40 ø 32 mm 95.00 m 119,960.00 11,396,200.00 -
Pipa BS schedule 40 ø 40 mm 35.00 m 152,510.00 5,337,850.00 -
Pipa BS schedule 40 ø 50 mm 25.00 m 189,020.00 4,725,500.00 -
Pipa BS schedule 40 ø 65 mm 35.00 m 265,720.00 9,300,200.00 -
Pipa BS schedule 40 ø 80 mm 35.00 m 346,050.00 12,111,750.00 -
Pipa BS schedule 40 ø 100 mm 10.00 m 481,570.00 4,815,700.00 -
Pipa BS schedule 40 ø 150 mm (vertikal di shaft) 5.00 m 806,530.00 4,032,650.00 -
Gate Valve 100 mm (di shaft, 1.00 unit 18,378,490.00 18,378,490.00 -
PRV dia. 100 mm 1.00 unit 40,633,630.00 40,633,630.00 -
Sprinkler head 83.00 unit 111,850.00 9,283,550.00 -
Branch control valve dia. 100 mm, terdiri dari 1.00 set 13,329,370.00 13,329,370.00 -
Indicator Butterfly Dia. 100 mm 300 psi
Water Flow Switch Dia. 100 mm
Test and Drain 3 in 1 Valve Brass Dia. 25 mm
Sight Glass

Fire Extunghusher
Pengadaan dan pemasangan alat pemadam api ringan, lengkap dengan dudukan
Fire Extinguisher dry chemnical multi purpose type, 3 kg 5.00 set 1,111,530.00 5,557,650.00 -

Pemipaan Pemadam Kebakaran Lantai 2


Hydrant
Pemipaan
Pipa BS schedule 40 ø 150 mm (vertikal di shaft) 5.00 m 806,530.00 4,032,650.00 -
Pipa BS schedule 40 ø 80 mm 5.00 m 346,050.00 1,730,250.00 -
Pipa BS schedule 40 ø 65 mm 95.00 m 265,720.00 25,243,400.00 -
Pipa BS schedule 40 ø 40 mm 2.00 m 152,510.00 305,020.00 -
FHC Indoor : 2.00 set 7,321,520.00 14,643,040.00 hooseki atau setara
-Hydrant box 125 X 75 X 18 cm ( 1Bh)
-Fire hose 1.5" X 30 M (Rooll)
-Hydrant Valve 2.5" (1 Bh)
-Hydrant Valve 1.5" (1 Bh)
-Seamless Nozzle 1.5" (1 Bh)
-Hose rack 1.5" (1 Bh)
Gate Valve 80 mm (di shaft, 1.00 unit 13,613,170.00 13,613,170.00 -
Sprinkler
Pemipaan
Pipa BS schedule 40 ø 25 mm 295.00 m 92,370.00 27,249,150.00 -
Pipa BS schedule 40 ø 32 mm 105.00 m 119,960.00 12,595,800.00 -
Pipa BS schedule 40 ø 40 mm 65.00 m 152,510.00 9,913,150.00 -
Pipa BS schedule 40 ø 50 mm 10.00 m 189,020.00 1,890,200.00 -
Pipa BS schedule 40 ø 65 mm 35.00 m 265,720.00 9,300,200.00 -
Pipa BS schedule 40 ø 80 mm 25.00 m 346,050.00 8,651,250.00 -
Pipa BS schedule 40 ø 100 mm 15.00 m 481,570.00 7,223,550.00 -
Pipa BS schedule 40 ø 150 mm 5.00 m 806,530.00 4,032,650.00 -
Pipa BS schedule 40 ø 150 mm (vertikal di shaft) 5.00 m 806,530.00 4,032,650.00 -
Gate Valve 150 mm (di shaft, 1.00 unit 35,202,090.00 35,202,090.00 -
PRV dia. 150 mm 1.00 unit 52,406,760.00 52,406,760.00 -
Sprinkler head 106.00 unit 111,440.00 11,812,640.00 -
Branch control valve dia. 150 mm, terdiri dari 1.00 set 17,505,220.00 17,505,220.00 -
Indicator Butterfly Dia. 150 mm 300 psi
Water Flow Switch Dia. 150 mm
Test and Drain 3 in 1 Valve Brass Dia. 25 mm
Sight Glass

Fire Extunghusher
Pengadaan dan pemasangan alat pemadam api ringan, lengkap dengan dudukan
Fire Extinguisher dry chemnical multi purpose type, 3 kg 5.00 set 1,111,530.00 5,557,650.00 hooseki atau setara

Pemipaan Pemadam Kebakaran Lantai 3


Hydrant
Pemipaan
Pipa BS schedule 40 ø 150 mm (vertikal di shaft) 5.00 m 806,530.00 4,032,650.00 -
Pipa BS schedule 40 ø 80 mm 5.00 m 346,050.00 1,730,250.00 -
Pipa BS schedule 40 ø 65 mm 85.00 m 265,720.00 22,586,200.00 -
Pipa BS schedule 40 ø 40 mm 2.00 m 152,510.00 305,020.00 -
FHC Indoor : 2.00 set 7,321,520.00 14,643,040.00 hooseki atau setara
-Hydrant box 125 X 75 X 18 cm ( 1Bh)
-Fire hose 1.5" X 30 M (Rooll)
-Hydrant Valve 2.5" (1 Bh)
-Hydrant Valve 1.5" (1 Bh)
-Seamless Nozzle 1.5" (1 Bh)
-Hose rack 1.5" (1 Bh)
Gate Valve 80 mm (di shaft, 1.00 unit 13,613,170.00 13,613,170.00 -
Sprinkler
Pemipaan
Pipa BS schedule 40 ø 25 mm 245.00 m 92,370.00 22,630,650.00 -
Pipa BS schedule 40 ø 32 mm 85.00 m 119,960.00 10,196,600.00 -
Pipa BS schedule 40 ø 40 mm 66.00 m 152,510.00 10,065,660.00 -
Pipa BS schedule 40 ø 50 mm 10.00 m 189,020.00 1,890,200.00 -
Pipa BS schedule 40 ø 65 mm 35.00 m 265,720.00 9,300,200.00 -
Pipa BS schedule 40 ø 80 mm 40.00 m 346,050.00 13,842,000.00 -
Pipa BS schedule 40 ø 100 mm 5.00 m 481,570.00 2,407,850.00 -
Pipa BS schedule 40 ø 150 mm (vertikal di shaft) 5.00 m 806,530.00 4,032,650.00 -
Gate Valve 100 mm (di shaft, 1.00 unit 18,378,490.00 18,378,490.00 -
PRV dia. 100 mm 1.00 unit 40,633,630.00 40,633,630.00 -
Sprinkler head 91.00 unit 111,440.00 10,141,040.00 -
Branch control valve dia. 100 mm, terdiri dari 1.00 set 13,329,370.00 13,329,370.00 -
Indicator Butterfly Dia. 100 mm 300 psi
Water Flow Switch Dia. 100 mm
Test and Drain 3 in 1 Valve Brass Dia. 25 mm
Sight Glass

Fire Extunghusher
Pengadaan dan pemasangan alat pemadam api ringan, lengkap dengan dudukan
Fire Extinguisher dry chemnical multi purpose type, 3 kg 5.00 set 1,111,530.00 5,557,650.00 hooseki atau setara

Intalasi fire supresion nitrogen mengunakan tabung 50kg lengkap dengan intalasi {pipa penyalur) 7.00 lot 15,011,400.00 105,079,800.00 -
dan kotrol dan valve.khusus ruang ok lantai 3 dan lantai 1

Pemipaan Pemadam Kebakaran Lantai 4


Hydrant
Pemipaan
Pipa BS schedule 40 ø 150 mm (vertikal di shaft) 5.00 m 806,530.00 4,032,650.00 -
Pipa BS schedule 40 ø 80 mm 5.00 m 346,050.00 1,730,250.00 -
Pipa BS schedule 40 ø 65 mm 75.00 m 265,720.00 19,929,000.00 -
Pipa BS schedule 40 ø 40 mm 2.00 m 152,510.00 305,020.00 -
FHC Indoor : 2.00 set 7,321,520.00 14,643,040.00 hooseki atau setara
-Hydrant box 125 X 75 X 18 cm ( 1Bh)
-Fire hose 1.5" X 30 M (Rooll)
-Hydrant Valve 2.5" (1 Bh)
-Hydrant Valve 1.5" (1 Bh)
-Seamless Nozzle 1.5" (1 Bh)
-Hose rack 1.5" (1 Bh)
Gate Valve 80 mm (di shaft, 1.00 unit 13,613,170.00 13,613,170.00 -
Sprinkler
Pemipaan
Pipa BS schedule 40 ø 25 mm 285.00 m 92,370.00 26,325,450.00 -
Pipa BS schedule 40 ø 32 mm 135.00 m 119,960.00 16,194,600.00 -
Pipa BS schedule 40 ø 40 mm 50.00 m 152,510.00 7,625,500.00 -
Pipa BS schedule 40 ø 50 mm 15.00 m 189,020.00 2,835,300.00 -
Pipa BS schedule 40 ø 65 mm 35.00 m 265,720.00 9,300,200.00 -
Pipa BS schedule 40 ø 80 mm 35.00 m 346,050.00 12,111,750.00 -
Pipa BS schedule 40 ø 100 mm 10.00 m 481,570.00 4,815,700.00 -
Pipa BS schedule 40 ø 150 mm 5.00 m 806,530.00 4,032,650.00 -
Pipa BS schedule 40 ø 150 mm (vertikal di shaft) 5.00 m 806,530.00 4,032,650.00 -
Gate Valve 150 mm (di shaft, 1.00 unit 35,202,090.00 35,202,090.00 -
PRV dia. 150 mm 1.00 unit 52,406,760.00 52,406,760.00 -
Sprinkler head 124.00 unit 111,440.00 13,818,560.00 -
Branch control valve dia. 150 mm, terdiri dari 1.00 set 17,505,220.00 17,505,220.00 -
Indicator Butterfly Dia. 150 mm 300 psi
Water Flow Switch Dia. 150 mm
Test and Drain 3 in 1 Valve Brass Dia. 25 mm
Sight Glass

Fire Extunghusher
Pengadaan dan pemasangan alat pemadam api ringan, lengkap dengan dudukan
Fire Extinguisher dry chemnical multi purpose type, 3 kg 5.00 set 1,111,530.00 5,557,650.00 hooseki atau setara

Pemipaan Pemadam Kebakaran Lantai 5


Hydrant
Pemipaan
Pipa BS schedule 40 ø 150 mm (vertikal di shaft) 5.00 m 806,530.00 4,032,650.00 -
Pipa BS schedule 40 ø 80 mm 10.00 m 346,050.00 3,460,500.00 -
Pipa BS schedule 40 ø 65 mm 95.00 m 265,720.00 25,243,400.00 -
Pipa BS schedule 40 ø 40 mm 2.00 m 152,510.00 305,020.00 -
FHC Indoor : 2.00 set 7,321,520.00 14,643,040.00 hooseki atau setara
-Hydrant box 125 X 75 X 18 cm ( 1Bh)
-Fire hose 1.5" X 30 M (Rooll)
-Hydrant Valve 2.5" (1 Bh)
-Hydrant Valve 1.5" (1 Bh)
-Seamless Nozzle 1.5" (1 Bh)
-Hose rack 1.5" (1 Bh)
Gate Valve 80 mm (di shaft, 1.00 unit 13,613,170.00 13,613,170.00 -
Sprinkler
Pemipaan
Pipa BS schedule 40 ø 25 mm 325.00 m 92,370.00 30,020,250.00 -
Pipa BS schedule 40 ø 32 mm 90.00 m 119,960.00 10,796,400.00 -
Pipa BS schedule 40 ø 40 mm 35.00 m 152,510.00 5,337,850.00 -
Pipa BS schedule 40 ø 50 mm 40.00 m 189,020.00 7,560,800.00 -
Pipa BS schedule 40 ø 65 mm 75.00 m 265,720.00 19,929,000.00 -
Pipa BS schedule 40 ø 80 mm 25.00 m 346,050.00 8,651,250.00 -
Pipa BS schedule 40 ø 100 mm 10.00 m 481,570.00 4,815,700.00 -
Pipa BS schedule 40 ø 150 mm 10.00 m 806,530.00 8,065,300.00 -
Pipa BS schedule 40 ø 150 mm (vertikal di shaft) 5.00 m 806,530.00 4,032,650.00 -
Gate Valve 150 mm (di shaft, 1.00 unit 35,202,090.00 35,202,090.00 -
PRV dia. 150 mm 1.00 unit 52,406,760.00 52,406,760.00 -
Sprinkler head 126.00 unit 111,440.00 14,041,440.00 -
Branch control valve dia. 150 mm, terdiri dari 1.00 set 17,505,220.00 17,505,220.00 -
Indicator Butterfly Dia. 150 mm 300 psi
Water Flow Switch Dia. 150 mm
Test and Drain 3 in 1 Valve Brass Dia. 25 mm
Sight Glass

Fire Extunghusher
Pengadaan dan pemasangan alat pemadam api ringan, lengkap dengan dudukan
Fire Extinguisher dry chemnical multi purpose type, 3 kg 5.00 set 1,111,530.00 5,557,650.00 hooseki atau setara

Pemipaan Pemadam Kebakaran Lantai 6


Hydrant
Pemipaan
Pipa BS schedule 40 ø 150 mm (vertikal di shaft) 5.00 m 806,530.00 4,032,650.00 -
Pipa BS schedule 40 ø 80 mm 10.00 m 346,050.00 3,460,500.00 -
Pipa BS schedule 40 ø 65 mm 95.00 m 265,720.00 25,243,400.00 -
Pipa BS schedule 40 ø 40 mm 2.00 m 152,510.00 305,020.00 -
FHC Indoor : 2.00 set 7,321,520.00 14,643,040.00 hooseki atau setara
-Hydrant box 125 X 75 X 18 cm ( 1Bh)
-Fire hose 1.5" X 30 M (Rooll)
-Hydrant Valve 2.5" (1 Bh)
-Hydrant Valve 1.5" (1 Bh)
-Seamless Nozzle 1.5" (1 Bh)
-Hose rack 1.5" (1 Bh)
Gate Valve 80 mm (di shaft, 1.00 unit 13,613,170.00 13,613,170.00 -
Sprinkler
Pemipaan
Pipa BS schedule 40 ø 25 mm 325.00 m 92,370.00 30,020,250.00 -
Pipa BS schedule 40 ø 32 mm 90.00 m 119,960.00 10,796,400.00 -
Pipa BS schedule 40 ø 40 mm 35.00 m 152,510.00 5,337,850.00 -
Pipa BS schedule 40 ø 50 mm 40.00 m 189,020.00 7,560,800.00 -
Pipa BS schedule 40 ø 65 mm 75.00 m 265,720.00 19,929,000.00 -
Pipa BS schedule 40 ø 80 mm 25.00 m 346,050.00 8,651,250.00 -
Pipa BS schedule 40 ø 100 mm 10.00 m 481,570.00 4,815,700.00 -
Pipa BS schedule 40 ø 150 mm 10.00 m 806,530.00 8,065,300.00 -
Pipa BS schedule 40 ø 150 mm (vertikal di shaft) 5.00 m 806,530.00 4,032,650.00 -
Gate Valve 150 mm (di shaft, 1.00 unit 35,202,090.00 35,202,090.00 -
PRV dia. 150 mm 1.00 unit 52,406,760.00 52,406,760.00 -
Sprinkler head 126.00 unit 111,440.00 14,041,440.00 -
Branch control valve dia. 150 mm, terdiri dari 1.00 set 17,505,220.00 17,505,220.00 -
Indicator Butterfly Dia. 150 mm 300 psi
Water Flow Switch Dia. 150 mm
Test and Drain 3 in 1 Valve Brass Dia. 25 mm
Sight Glass

Fire Extunghusher
Pengadaan dan pemasangan alat pemadam api ringan, lengkap dengan dudukan
Fire Extinguisher dry chemnical multi purpose type, 3 kg 5.00 set 1,111,530.00 5,557,650.00 -

Pemipaan Pemadam Kebakaran Lantai 7


Hydrant
Pemipaan
Pipa BS schedule 40 ø 150 mm (vertikal di shaft) 5.00 m 806,530.00 4,032,650.00 -
Pipa BS schedule 40 ø 80 mm 10.00 m 346,050.00 3,460,500.00 -
Pipa BS schedule 40 ø 65 mm 95.00 m 265,720.00 25,243,400.00 -
Pipa BS schedule 40 ø 40 mm 2.00 m 152,510.00 305,020.00 -
FHC Indoor : 2.00 set 7,321,520.00 14,643,040.00 hooseki atau setara
-Hydrant box 125 X 75 X 18 cm ( 1Bh)
-Fire hose 1.5" X 30 M (Rooll)
-Hydrant Valve 2.5" (1 Bh)
-Hydrant Valve 1.5" (1 Bh)
-Seamless Nozzle 1.5" (1 Bh)
-Hose rack 1.5" (1 Bh)
Gate Valve 80 mm (di shaft, 1.00 unit 13,613,170.00 13,613,170.00 -
Sprinkler
Pemipaan
Pipa BS schedule 40 ø 25 mm 305.00 m 92,370.00 28,172,850.00 -
Pipa BS schedule 40 ø 32 mm 75.00 m 119,960.00 8,997,000.00 -
Pipa BS schedule 40 ø 40 mm 35.00 m 152,510.00 5,337,850.00 -
Pipa BS schedule 40 ø 50 mm 40.00 m 189,020.00 7,560,800.00 -
Pipa BS schedule 40 ø 65 mm 75.00 m 265,720.00 19,929,000.00 -
Pipa BS schedule 40 ø 80 mm 25.00 m 346,050.00 8,651,250.00 -
Pipa BS schedule 40 ø 100 mm 10.00 m 481,570.00 4,815,700.00 -
Pipa BS schedule 40 ø 150 mm 10.00 m 806,530.00 8,065,300.00 -
Pipa BS schedule 40 ø 150 mm (vertikal di shaft) 5.00 m 806,530.00 4,032,650.00 -
Gate Valve 150 mm (di shaft, 1.00 unit 35,202,090.00 35,202,090.00 -
PRV dia. 150 mm 1.00 unit 52,406,760.00 52,406,760.00 -
Sprinkler head 123.00 unit 111,440.00 13,707,120.00 -
Branch control valve dia. 150 mm, terdiri dari 1.00 set 17,505,220.00 17,505,220.00 -
Indicator Butterfly Dia. 150 mm 300 psi
Water Flow Switch Dia. 150 mm
Test and Drain 3 in 1 Valve Brass Dia. 25 mm
Sight Glass

Fire Extunghusher
Pengadaan dan pemasangan alat pemadam api ringan, lengkap dengan dudukan
Fire Extinguisher dry chemnical multi purpose type, 3 kg 5.00 set 1,111,530.00 5,557,650.00 hooseki atau setara

Pemipaan Pemadam Kebakaran Lantai Atap


Hydrant
Pemipaan
Pipa BS schedule 40 ø 150 mm (vertikal di shaft) 5.00 m 806,530.00 4,032,650.00 -
Pipa BS schedule 40 ø 80 mm 5.00 m 346,050.00 1,730,250.00 -
Pipa BS schedule 40 ø 65 mm 75.00 m 265,720.00 19,929,000.00 -
Pipa BS schedule 40 ø 40 mm 2.00 m 152,510.00 305,020.00 -
FHC Indoor : 2.00 set 7,321,520.00 14,643,040.00 hooseki atau setara
-Hydrant box 125 X 75 X 18 cm ( 1Bh)
-Fire hose 1.5" X 30 M (Rooll)
-Hydrant Valve 2.5" (1 Bh)
-Hydrant Valve 1.5" (1 Bh)
-Seamless Nozzle 1.5" (1 Bh)
-Hose rack 1.5" (1 Bh)
Gate Valve 80 mm (di shaft, 1.00 unit 13,613,170.00 13,613,170.00 -
Sprinkler
Pemipaan
Pipa BS schedule 40 ø 25 mm 185.00 m 92,370.00 17,088,450.00 -
Pipa BS schedule 40 ø 32 mm 60.00 m 119,960.00 7,197,600.00 -
Pipa BS schedule 40 ø 40 mm 20.00 m 152,510.00 3,050,200.00 -
Pipa BS schedule 40 ø 50 mm 5.00 m 189,020.00 945,100.00 -
Pipa BS schedule 40 ø 65 mm 25.00 m 265,720.00 6,643,000.00 -
Pipa BS schedule 40 ø 80 mm 30.00 m 346,050.00 10,381,500.00 -
Pipa BS schedule 40 ø 100 mm 15.00 m 481,570.00 7,223,550.00 -
Pipa BS schedule 40 ø 150 mm (vertikal di shaft) 5.00 m 806,530.00 4,032,650.00 -
Gate Valve 100 mm (di shaft, 1.00 unit 18,378,490.00 18,378,490.00 -
PRV dia. 100 mm 1.00 unit 40,633,630.00 40,633,630.00 -
Sprinkler head 65.00 unit 111,440.00 7,243,600.00 -
Branch control valve dia. 100 mm, terdiri dari 1.00 set 13,329,370.00 13,329,370.00 -
Indicator Butterfly Dia. 100 mm 300 psi
Water Flow Switch Dia. 100 mm
Test and Drain 3 in 1 Valve Brass Dia. 25 mm
Sight Glass

Fire Extunghusher
Pengadaan dan pemasangan alat pemadam api ringan, lengkap dengan dudukan
Fire Extinguisher dry chemnical multi purpose type, 3 kg 5.00 set 1,111,530.00 5,557,650.00 hooseki atau setara
GRAND TOTAL PEKERJAAN PEMADAM KEBAKARAN HYDRANT DAN SPRINKLER

K PEKERJAAN AIR CONDITION


PENGKONDISIAN UDARA LT.1
Unit VRF/VRV Incl. instalasi, Bracket & Acc
pemipaan refrigrant,control cable
Indoor Unit 7.500 Btu/h, Wall Mounted 17.00 bh 10,748,930.00 182,731,810.00 DAIKIN
Indoor Unit 9.600 Btu/h, Wall Mounted 2.00 bh 11,132,440.00 22,264,880.00 DAIKIN
Indoor Unit 19.100 Btu/h, Wall Mounted 1.00 bh 13,944,840.00 13,944,840.00 DAIKIN
Indoor Unit 9.600 Btu/h, Ceilling Mounted Cassete 4.00 bh 15,433,210.00 61,732,840.00 DAIKIN
Indoor Unit 12.300 Btu/h, Ceilling Mounted Cassete 1.00 bh 15,944,560.00 15,944,560.00 DAIKIN
Indoor Unit 19.100 Btu/h, Ceilling Mounted Cassete 7.00 bh 19,894,490.00 139,261,430.00 DAIKIN
Indoor Unit 24.200 Btu/h, Ceilling Mounted Cassete 10.00 bh 20,660,490.00 206,604,900.00 DAIKIN
Indoor Unit 96.000 Btu/h, Ceilling Mounted Duct Type 1.00 bh 40,961,250.00 40,961,250.00 DAIKIN
Wired Remote Control 43.00 bh 723,340.00 31,103,620.00 DAIKIN
Outdoor Unit
Outdoor Unit 268.000 Btu/h 1.00 bh 220,258,260.00 220,258,260.00 DAIKIN
Outdoor Unit 362.000 Btu/h 1.00 bh 282,585,620.00 282,585,620.00 DAIKIN
Outdoor Unit 96.000 Btu/h 1.00 bh 79,636,010.00 79,636,010.00 DAIKIN

Pipa Liquid dan Gas, ukuran sesuai rekomendasi pabrik, pipa tembaga kualitas tinggi, Type L atau jenis oxidized
phosphorous seamless copper pipe, merk Crane Enfiled atau setara. Lengkap dengan aseories yang diperlukan, sesuai
spesifikasi teknis. isolasi pipa refrigerant bagian gas (gas side) dengan thermaflex, bagian liquid tidak diisolasi.

Pemipaan pengembunan (drain) indoor


Pipa PVC AW, lengkap penggantung sesuai spesifikasi teknis, U-trap, sambungan solvent cemnet, konektor, slope 1%
Isolasi pipa pengembunan (termasuk pipa dalam dinding), dengan flexible closed cell elastomeric insulation
merk Amstrong (armaflex) atau setara.
Ukuran pipa minimal dia. 20 mm, atau sesuai rekomendasi pabrik.
Pipa PVC AW ø 20 mm, dng isolasi 200.00 m 26,970.00 5,394,000.00 Insuflex atau setara
Pipa PVC AW ø 25 mm, dng isolasi 200.00 m 30,790.00 6,158,000.00 Insuflex atau setara

Exhaust Fan
Exhaust Fan,, Kap. 100 cfm, ceiling fan 22.00 bh 1,201,010.00 26,422,220.00 -

PENGKONDISIAN UDARA LT.2


Unit VRF/VRV Incl. instalasi, Bracket & Acc
pemipaan refrigrant,control cable
Indoor Unit 7.500 Btu/h, Wall Mounted 20.00 bh 10,748,930.00 214,978,600.00 DAIKIN
Indoor Unit 9.600 Btu/h, Ceilling Mounted Cassete 3.00 bh 15,433,210.00 46,299,630.00 DAIKIN
Indoor Unit 15.400 Btu/h, Ceilling Mounted Cassete 2.00 bh 17,047,090.00 34,094,180.00 DAIKIN
Indoor Unit 19.100 Btu/h, Ceilling Mounted Cassete 8.00 bh 19,894,490.00 159,155,920.00 DAIKIN
Indoor Unit 24.200 Btu/h, Ceilling Mounted Cassete 11.00 bh 20,660,490.00 227,265,390.00 DAIKIN
Wired Remote Control 44.00 bh 723,340.00 31,826,960.00 DAIKIN
Outdoor Unit
Outdoor Unit 136.000 Btu/h 1.00 bh 111,503,370.00 111,503,370.00 DAIKIN
Outdoor Unit 154.000 Btu/h 1.00 bh 127,526,250.00 127,526,250.00 DAIKIN
Outdoor Unit 382.000 Btu/h 1.00 bh 299,735,820.00 299,735,820.00 DAIKIN

Pipa Liquid dan Gas, ukuran sesuai rekomendasi pabrik, pipa tembaga kualitas tinggi, Type L atau jenis oxidized
phosphorous seamless copper pipe, merk Crane Enfiled atau setara. Lengkap dengan aseories yang diperlukan, sesuai
spesifikasi teknis. isolasi pipa refrigerant bagian gas (gas side) dengan thermaflex, bagian liquid tidak diisolasi.

Pemipaan pengembunan (drain) indoor


Pipa PVC AW, lengkap penggantung sesuai spesifikasi teknis, U-trap, sambungan solvent cemnet, konektor, slope 1%
Isolasi pipa pengembunan (termasuk pipa dalam dinding), dengan flexible closed cell elastomeric insulation
merk Amstrong (armaflex) atau setara.
Ukuran pipa minimal dia. 20 mm, atau sesuai rekomendasi pabrik.
Pipa PVC AW ø 20 mm, dng isolasi 200.00 m 26,970.00 5,394,000.00 Insuflex atau setara
Pipa PVC AW ø 25 mm, dng isolasi 200.00 m 30,790.00 6,158,000.00 Insuflex atau setara

Exhaust Fan
Exhaust Fan,, Kap. 100 cfm, ceiling fan 12.00 bh 1,201,010.00 14,412,120.00 -

PENGKONDISIAN UDARA LT.3


Unit VRF/VRV Incl. instalasi, Bracket & Acc
pemipaan refrigrant,control cable
Indoor Unit 7.500 Btu/h, Wall Mounted 21.00 bh 10,748,930.00 225,727,530.00 DAIKIN
Indoor Unit 9.600 Btu/h, Wall Mounted 2.00 bh 11,132,440.00 22,264,880.00 DAIKIN
Indoor Unit 9.600 Btu/h, Ceilling Mounted Cassete 1.00 bh 15,433,210.00 15,433,210.00 DAIKIN
Indoor Unit 12.300 Btu/h, Ceilling Mounted Cassete 6.00 bh 16,206,750.00 97,240,500.00 DAIKIN
Indoor Unit 15.400 Btu/h, Ceilling Mounted Cassete 9.00 bh 17,047,090.00 153,423,810.00 DAIKIN
Indoor Unit 24.200 Btu/h, Ceilling Mounted Cassete 3.00 bh 20,660,490.00 61,981,470.00 DAIKIN
Indoor Unit 30.700 Btu/h, Ceilling Mounted Cassete 2.00 bh 21,332,540.00 42,665,080.00 DAIKIN
Wired Remote Control 44.00 bh 723,340.00 31,826,960.00 DAIKIN
Outdoor Unit
Outdoor Unit 553.000 Btu/h 1.00 bh 431,147,980.00 431,147,980.00 DAIKIN

AC Ruang Operasi (Chiller ) 1.00 ls 18,123,171,920.00 18,123,171,920.00 Eraco atau setara

Pipa Liquid dan Gas, ukuran sesuai rekomendasi pabrik, pipa tembaga kualitas tinggi, Type L atau jenis oxidized
phosphorous seamless copper pipe, merk Crane Enfiled atau setara. Lengkap dengan aseories yang diperlukan, sesuai
spesifikasi teknis. isolasi pipa refrigerant bagian gas (gas side) dengan thermaflex, bagian liquid tidak diisolasi.

Pemipaan pengembunan (drain) indoor


Pipa PVC AW, lengkap penggantung sesuai spesifikasi teknis, U-trap, sambungan solvent cemnet, konektor, slope 1%
Isolasi pipa pengembunan (termasuk pipa dalam dinding), dengan flexible closed cell elastomeric insulation
merk Amstrong (armaflex) atau setara.
Ukuran pipa minimal dia. 20 mm, atau sesuai rekomendasi pabrik.
Pipa PVC AW ø 20 mm, dng isolasi 200.00 m 26,970.00 5,394,000.00 Insuflex atau setara
Pipa PVC AW ø 25 mm, dng isolasi 200.00 m 30,790.00 6,158,000.00 Insuflex atau setara

Exhaust Fan
Exhaust Fan,, Kap. 100 cfm, ceiling fan 17.00 bh 1,201,010.00 20,417,170.00 -

PENGKONDISIAN UDARA LT.4


Unit VRF/VRV Incl. instalasi, Bracket & Acc
pemipaan refrigrant,control cable
Indoor Unit 7.500 Btu/h, Wall Mounted 3.00 bh 10,748,930.00 32,246,790.00 DAIKIN
Indoor Unit 9.600 Btu/h, Wall Mounted 1.00 bh 11,132,440.00 11,132,440.00 DAIKIN
Indoor Unit 15.400 Btu/h, Wall Mounted 1.00 bh 12,155,130.00 12,155,130.00 DAIKIN
Indoor Unit 15.400 Btu/h, Ceilling Mounted Cassete 3.00 bh 17,047,090.00 51,141,270.00 DAIKIN
Indoor Unit 19.100 Btu/h, Ceilling Mounted Cassete 5.00 bh 19,894,490.00 99,472,450.00 DAIKIN
Indoor Unit 24.200 Btu/h, Ceilling Mounted Cassete 1.00 bh 20,660,490.00 20,660,490.00 DAIKIN
Indoor Unit 30.700 Btu/h, Ceilling Mounted Cassete 8.00 bh 21,332,540.00 170,660,320.00 DAIKIN
Indoor Unit 38.200 Btu/h, Ceilling Mounted Cassete 6.00 bh 21,485,150.00 128,910,900.00 DAIKIN
Wired Remote Control 28.00 bh 723,340.00 20,253,520.00 DAIKIN
Outdoor Unit
Outdoor Unit 285.000 Btu/h 1.00 bh 227,072,290.00 227,072,290.00 DAIKIN
Outdoor Unit 420.000 Btu/h 1.00 bh 338,736,280.00 338,736,280.00 DAIKIN
Pipa Liquid dan Gas, ukuran sesuai rekomendasi pabrik, pipa tembaga kualitas tinggi, Type L atau jenis oxidized
phosphorous seamless copper pipe, merk Crane Enfiled atau setara. Lengkap dengan aseories yang diperlukan, sesuai
spesifikasi teknis. isolasi pipa refrigerant bagian gas (gas side) dengan thermaflex, bagian liquid tidak diisolasi.

Pemipaan pengembunan (drain) indoor


Pipa PVC AW, lengkap penggantung sesuai spesifikasi teknis, U-trap, sambungan solvent cemnet, konektor, slope 1%
Isolasi pipa pengembunan (termasuk pipa dalam dinding), dengan flexible closed cell elastomeric insulation
merk Amstrong (armaflex) atau setara.
Ukuran pipa minimal dia. 20 mm, atau sesuai rekomendasi pabrik.
Pipa PVC AW ø 20 mm, dng isolasi 200.00 m 26,970.00 5,394,000.00 Insuflex atau setara
Pipa PVC AW ø 25 mm, dng isolasi 200.00 m 30,790.00 6,158,000.00 Insuflex atau setara

Exhaust Fan
Exhaust Fan,, Kap. 100 cfm, ceiling fan 7.00 bh 1,201,010.00 8,407,070.00 -

PENGKONDISIAN UDARA LT.5


Unit VRF/VRV Incl. instalasi, Bracket & Acc
pemipaan refrigrant,control cable
Indoor Unit 7.500 Btu/h, Wall Mounted 10.00 bh 10,748,930.00 107,489,300.00 DAIKIN
Indoor Unit 9.600 Btu/h, Wall Mounted 3.00 bh 11,132,440.00 33,397,320.00 DAIKIN
Indoor Unit 12.300 Btu/h, Wall Mounted 22.00 bh 11,279,240.00 248,143,280.00 DAIKIN
Indoor Unit 15.400 Btu/h, Wall Mounted 1.00 bh 12,155,130.00 12,155,130.00 DAIKIN
Indoor Unit 9.600 Btu/h, Ceilling Mounted Cassete 2.00 bh 15,433,210.00 30,866,420.00 DAIKIN
Indoor Unit 15.400 Btu/h, Ceilling Mounted Cassete 2.00 bh 17,047,090.00 34,094,180.00 DAIKIN
Indoor Unit 19.100 Btu/h, Ceilling Mounted Cassete 12.00 bh 19,894,490.00 238,733,880.00 DAIKIN
Wired Remote Control 52.00 bh 723,340.00 37,613,680.00 DAIKIN
Outdoor Unit
Outdoor Unit 307.000 Btu/h 1.00 bh 246,241,130.00 246,241,130.00 DAIKIN
Outdoor Unit 399.000 Btu/h 1.00 bh 321,958,790.00 321,958,790.00 DAIKIN

Pipa Liquid dan Gas, ukuran sesuai rekomendasi pabrik, pipa tembaga kualitas tinggi, Type L atau jenis oxidized
phosphorous seamless copper pipe, merk Crane Enfiled atau setara. Lengkap dengan aseories yang diperlukan, sesuai
spesifikasi teknis. isolasi pipa refrigerant bagian gas (gas side) dengan thermaflex, bagian liquid tidak diisolasi.

Pemipaan pengembunan (drain) indoor


Pipa PVC AW, lengkap penggantung sesuai spesifikasi teknis, U-trap, sambungan solvent cemnet, konektor, slope 1%
Isolasi pipa pengembunan (termasuk pipa dalam dinding), dengan flexible closed cell elastomeric insulation
merk Amstrong (armaflex) atau setara.
Ukuran pipa minimal dia. 20 mm, atau sesuai rekomendasi pabrik.
Pipa PVC AW ø 20 mm, dng isolasi 200.00 m 26,970.00 5,394,000.00 Insuflex atau setara
Pipa PVC AW ø 25 mm, dng isolasi 200.00 m 30,790.00 6,158,000.00 Insuflex atau setara

Exhaust Fan
Exhaust Fan,, Kap. 100 cfm, ceiling fan 24.00 bh 1,201,010.00 28,824,240.00 -

PENGKONDISIAN UDARA LT.6


Unit VRF/VRV Incl. instalasi, Bracket & Acc
pemipaan refrigrant,control cable
Indoor Unit 7.500 Btu/h, Wall Mounted 10.00 bh 10,748,930.00 107,489,300.00 DAIKIN
Indoor Unit 9.600 Btu/h, Wall Mounted 3.00 bh 11,132,440.00 33,397,320.00 DAIKIN
Indoor Unit 12.300 Btu/h, Wall Mounted 22.00 bh 11,279,240.00 248,143,280.00 DAIKIN
Indoor Unit 15.400 Btu/h, Wall Mounted 1.00 bh 12,155,130.00 12,155,130.00 DAIKIN
Indoor Unit 9.600 Btu/h, Ceilling Mounted Cassete 2.00 bh 15,433,210.00 30,866,420.00 DAIKIN
Indoor Unit 15.400 Btu/h, Ceilling Mounted Cassete 2.00 bh 17,047,090.00 34,094,180.00 DAIKIN
Indoor Unit 19.100 Btu/h, Ceilling Mounted Cassete 12.00 bh 19,894,490.00 238,733,880.00 DAIKIN
Wired Remote Control 52.00 bh 723,340.00 37,613,680.00 DAIKIN
Outdoor Unit
Outdoor Unit 307.000 Btu/h 1.00 bh 246,241,130.00 246,241,130.00 DAIKIN
Outdoor Unit 399.000 Btu/h 1.00 bh 321,958,790.00 321,958,790.00 DAIKIN

Pipa Liquid dan Gas, ukuran sesuai rekomendasi pabrik, pipa tembaga kualitas tinggi, Type L atau jenis oxidized
phosphorous seamless copper pipe, merk Crane Enfiled atau setara. Lengkap dengan aseories yang diperlukan, sesuai
spesifikasi teknis. isolasi pipa refrigerant bagian gas (gas side) dengan thermaflex, bagian liquid tidak diisolasi.

Pemipaan pengembunan (drain) indoor


Pipa PVC AW, lengkap penggantung sesuai spesifikasi teknis, U-trap, sambungan solvent cemnet, konektor, slope 1%
Isolasi pipa pengembunan (termasuk pipa dalam dinding), dengan flexible closed cell elastomeric insulation
merk Amstrong (armaflex) atau setara.
Ukuran pipa minimal dia. 20 mm, atau sesuai rekomendasi pabrik.
Pipa PVC AW ø 20 mm, dng isolasi 200.00 m 26,970.00 5,394,000.00 Insuflex atau setara
Pipa PVC AW ø 25 mm, dng isolasi 200.00 m 30,790.00 6,158,000.00 Insuflex atau setara

Exhaust Fan
Exhaust Fan,, Kap. 100 cfm, ceiling fan 24.00 bh 1,201,010.00 28,824,240.00 -

PENGKONDISIAN UDARA LT.7


Unit VRF/VRV Incl. instalasi, Bracket & Acc
pemipaan refrigrant,control cable
Indoor Unit 7.500 Btu/h, Wall Mounted 10.00 bh 10,748,930.00 107,489,300.00 DAIKIN
Indoor Unit 9.600 Btu/h, Wall Mounted 3.00 bh 11,132,440.00 33,397,320.00 DAIKIN
Indoor Unit 12.300 Btu/h, Wall Mounted 22.00 bh 11,279,240.00 248,143,280.00 DAIKIN
Indoor Unit 15.400 Btu/h, Wall Mounted 1.00 bh 12,155,130.00 12,155,130.00 DAIKIN
Indoor Unit 9.600 Btu/h, Ceilling Mounted Cassete 2.00 bh 15,433,210.00 30,866,420.00 DAIKIN
Indoor Unit 15.400 Btu/h, Ceilling Mounted Cassete 2.00 bh 17,047,090.00 34,094,180.00 DAIKIN
Indoor Unit 19.100 Btu/h, Ceilling Mounted Cassete 12.00 bh 19,894,490.00 238,733,880.00 DAIKIN
Wired Remote Control 52.00 bh 723,340.00 37,613,680.00 DAIKIN
Outdoor Unit
Outdoor Unit 307.000 Btu/h 1.00 bh 246,241,130.00 246,241,130.00 DAIKIN
Outdoor Unit 399.000 Btu/h 1.00 bh 321,958,790.00 321,958,790.00 DAIKIN

Pipa Liquid dan Gas, ukuran sesuai rekomendasi pabrik, pipa tembaga kualitas tinggi, Type L atau jenis oxidized
phosphorous seamless copper pipe, merk Crane Enfiled atau setara. Lengkap dengan aseories yang diperlukan, sesuai
spesifikasi teknis. isolasi pipa refrigerant bagian gas (gas side) dengan thermaflex, bagian liquid tidak diisolasi.

Pemipaan pengembunan (drain) indoor


Pipa PVC AW, lengkap penggantung sesuai spesifikasi teknis, U-trap, sambungan solvent cemnet, konektor, slope 1%
Isolasi pipa pengembunan (termasuk pipa dalam dinding), dengan flexible closed cell elastomeric insulation
merk Amstrong (armaflex) atau setara.
Ukuran pipa minimal dia. 20 mm, atau sesuai rekomendasi pabrik.
Pipa PVC AW ø 20 mm, dng isolasi 200.00 m 26,970.00 5,394,000.00 Insuflex atau setara
Pipa PVC AW ø 25 mm, dng isolasi 200.00 m 30,790.00 6,158,000.00 Insuflex atau setara

Exhaust Fan
Exhaust Fan,, Kap. 100 cfm, ceiling fan 34.00 bh 1,201,010.00 40,834,340.00 -

PENGKONDISIAN UDARA LT.Atap


Unit VRF/VRV Incl. instalasi, Bracket & Acc
pemipaan refrigrant,control cable
Indoor Unit 9.600 Btu/h, Wall Mounted 2.00 bh 11,132,440.00 22,264,880.00 DAIKIN
Indoor Unit 12.300 Btu/h, Wall Mounted 1.00 bh 11,279,240.00 11,279,240.00 DAIKIN
Indoor Unit 19.100 Btu/h, Ceilling Mounted Cassete 1.00 bh 19,894,490.00 19,894,490.00 DAIKIN
Indoor Unit 24.200 Btu/h, Ceilling Mounted Cassete 4.00 bh 20,660,490.00 82,641,960.00 DAIKIN
Indoor Unit 30.700 Btu/h, Ceilling Mounted Cassete 9.00 bh 21,807,170.00 196,264,530.00 DAIKIN
Wired Remote Control 17.00 bh 723,340.00 12,296,780.00 DAIKIN
Outdoor Unit
Outdoor Unit 444.000 Btu/h 1.00 bh 358,122,700.00 358,122,700.00 DAIKIN

Pipa Liquid dan Gas, ukuran sesuai rekomendasi pabrik, pipa tembaga kualitas tinggi, Type L atau jenis oxidized
phosphorous seamless copper pipe, merk Crane Enfiled atau setara. Lengkap dengan aseories yang diperlukan, sesuai
spesifikasi teknis. isolasi pipa refrigerant bagian gas (gas side) dengan thermaflex, bagian liquid tidak diisolasi.

Pemipaan pengembunan (drain) indoor


Pipa PVC AW, lengkap penggantung sesuai spesifikasi teknis, U-trap, sambungan solvent cemnet, konektor, slope 1%
Isolasi pipa pengembunan (termasuk pipa dalam dinding), dengan flexible closed cell elastomeric insulation
merk Amstrong (armaflex) atau setara.
Ukuran pipa minimal dia. 20 mm, atau sesuai rekomendasi pabrik.
Pipa PVC AW ø 20 mm, dng isolasi 200.00 m 26,970.00 5,394,000.00 Insuflex atau setara
Pipa PVC AW ø 25 mm, dng isolasi 200.00 m 30,790.00 6,158,000.00 Insuflex atau setara

Exhaust Fan
Exhaust Fan,, Kap. 100 cfm, ceiling fan 9.00 bh 1,201,010.00 10,809,090.00 -
GRAND TOTAL PEKERJAAN AIR CONDITION (HVAC)

L PEKERJAAN INSTALASI GAS MEDIS


RUANG SENTRAL GAS MEDIS
I PERALATAN UTAMA
Pengadaan & pemasangan peralatan dibawah
ini lengkap dengan steel bracket, klem support
dan semua aksesorisnya.
1 Medical Gas Manifold Oxigen (O), 2x10 Cyl. 1.00 Unit 137,870,990.00 137,870,990.00 HARRIS
2 Medical Gas Manifold Nitrous Oxside (N), 2x6 Cyl. 1.00 Unit 108,899,680.00 108,899,680.00 HARRIS
3 Medical Gas Compressed Air system (A), 2x3.7 kW 1.00 set 318,004,910.00 318,004,910.00 HITACHI
4 Medical Gas Vacuum Pump system (V), 2x3.7 kW 1.00 set 218,307,530.00 218,307,530.00 WONCHANG
5 Master Alarm for 4 Gases (O, N, A, V) 1.00 set 17,329,380.00 17,329,380.00 -
6 Pekerjaan Pipa menggunakan tembaga seamless
ASTM B-819 Tipe L, support pipa maksimal setiap 2m
pipa pada support dilindungi oleh bahan karet
Dia. 1/2" 150.00 mtr 80,080.00 12,012,000.00 BRASCO
Dia. 1 3/8" 150.00 mtr 344,090.00 51,613,500.00 BRASCO
Dia. 2 1/8" 150.00 mtr 667,770.00 100,165,500.00 BRASCO
Dia. 2 5/8" 150.00 mtr 1,046,730.00 157,009,500.00 BRASCO

PEKERJAAN IGM LANTAI SATU


1 Wall Outlet Oxygen (O), pin index, push type 20.00 Buah 2,067,270.00 41,345,400.00 SME
2 Wall Outlet Nitrous Oxide (N), pin index, push type 2.00 Buah 2,067,270.00 4,134,540.00 SME
3 Wall Outlet Compressed Air (A), pin index, push type 19.00 Buah 2,067,270.00 39,278,130.00 SME
4 Wall Outlet Vacuum (V), pin index, push type, slide base 19.00 Buah 2,067,270.00 39,278,130.00 SME
5 Area Alarm 4 Gas (O, N, A, V) 1.00 Set 25,467,440.00 25,467,440.00 -
6 Zona Valve 4 Gas (O, N, A, V) 1.00 Set 25,194,860.00 25,194,860.00 -
7 Area Alarm 3 Gas (O, A, V) 1.00 Set 24,127,260.00 24,127,260.00 -
8 Zona Valve 3 Gas (O, A, V) 1.00 Set 20,830,450.00 20,830,450.00 -
9 Anesthetic Gas Scavenging System (AGSS) 1.00 Unit 26,909,790.00 26,909,790.00 -
10 Ceiling Outlet Type 4 Gass 1.00 set 30,752,250.00 30,752,250.00 SAMSUNG

Ceiling pendant 1.00 set 349,482,360.00 349,482,360.00 SAMSUNG


11 Type (AI 14-1000 )
Double arm type (Non retracable)
Pneumatic brake system

12 Pekerjaan Pipa menggunakan tembaga seamless


ASTM B-819 Tipe L, support pipa maksimal setiap 2m
pipa pada support dilindungi oleh bahan karet
Dia. 3/8" 320.00 mtr 54,240.00 17,356,800.00 BRASCO
Dia. 1/2" 185.00 mtr 80,060.00 14,811,100.00 BRASCO
Dia. 5/8" 150.00 mtr 113,670.00 17,050,500.00 BRASCO
Dia. 3/4" 65.00 mtr 140,590.00 9,138,350.00 BRASCO

PEKERJAAN IGM LANTAI DUA


1 Wall Outlet Oxygen (O), pin index, push type 39.00 Buah 2,067,270.00 80,623,530.00 SME
2 Wall Outlet Compressed Air (A), pin index, push type 39.00 Buah 2,067,270.00 80,623,530.00 SME
3 Wall Outlet Vacuum (V), pin index, push type, slide base 39.00 Buah 2,067,270.00 80,623,530.00 SME
4 Area Alarm 3 Gas (O, A, V) 4.00 Set 24,127,260.00 96,509,040.00 -
5 Zona Valve 3 Gas (O, A, V) 4.00 Set 20,830,450.00 83,321,800.00 -

Pekerjaan Pipa menggunakan tembaga seamless


6 ASTM B-819 Tipe L, support pipa maksimal setiap 2m
pipa pada support dilindungi oleh bahan karet
Dia. 3/8" 615.00 mtr 54,240.00 33,357,600.00 BRASCO
Dia. 1/2" 400.00 mtr 80,060.00 32,024,000.00 BRASCO
Dia. 5/8" 130.00 mtr 113,670.00 14,777,100.00 BRASCO
Dia. 3/4" 20.00 mtr 140,590.00 2,811,800.00 BRASCO
Dia. 1" 5.00 mtr 218,840.00 1,094,200.00 BRASCO
Dia. 1-1/8" 5.00 mtr 250,500.00 1,252,500.00 BRASCO
PEKERJAAN IGM LANTAI TIGA
1 Wall Outlet Oxygen (O), pin index, push type 33.00 Buah 2,067,270.00 68,219,910.00 SME
2 Wall Outlet Nitrous Oxide (N), pin index, push type 12.00 Buah 2,067,270.00 24,807,240.00 SME
3 Wall Outlet Compressed Air (A), pin index, push type 21.00 Buah 2,067,270.00 43,412,670.00 SME
4 Wall Outlet Vacuum (V), pin index, push type, slide base 27.00 Buah 2,067,270.00 55,816,290.00 SME
5 Area Alarm 4 Gas (O, N, A, V) 6.00 Set 25,467,440.00 152,804,640.00 -
6 Zona Valve 4 Gas (O, N, A, V) 6.00 Set 25,194,860.00 151,169,160.00 -
7 Area Alarm 3 Gas (O, A, V) 1.00 Set 24,127,260.00 24,127,260.00 -
8 Zona Valve 3 Gas (O, A, V) 1.00 Set 20,830,450.00 20,830,450.00 -
9 Area Alarm 2 Gas (O, V) 1.00 Set 24,127,260.00 24,127,260.00 -
10 Zona Valve 2 Gas (O, V) 1.00 Set 13,821,410.00 13,821,410.00 -
11 Anesthetic Gas Scavenging System (AGSS) 6.00 Unit 26,909,790.00 161,458,740.00 -
12 Ceiling Outlet Type 4 Gass 6.00 set 30,752,250.00 184,513,500.00 SAMSUNG

Ceiling pendant 6.00 set 349,482,360.00 2,096,894,160.00 SAMSUNG


13 Type (AI 14-1000 )
Double arm type (Non retracable)
Pneumatic brake system

Pekerjaan Pipa menggunakan tembaga seamless


14 ASTM B-819 Tipe L, support pipa maksimal setiap 2m
pipa pada support dilindungi oleh bahan karet
Dia. 3/8" 580.00 mtr 54,240.00 31,459,200.00 BRASCO
Dia. 1/2" 315.00 mtr 80,060.00 25,218,900.00 BRASCO
Dia. 5/8" 50.00 mtr 113,670.00 5,683,500.00 BRASCO
Dia. 3/4" 30.00 mtr 140,590.00 4,217,700.00 BRASCO
Dia. 1" 5.00 mtr 218,840.00 1,094,200.00 BRASCO

PEKERJAAN IGM LANTAI LIMA


1 Wall Outlet Oxygen (O), pin index, push type 54.00 Buah 2,067,270.00 111,632,580.00 SME
2 Wall Outlet Compressed Air (A), pin index, push type 2.00 Buah 2,067,270.00 4,134,540.00 SME
3 Wall Outlet Vacuum (V), pin index, push type, slide base 54.00 Buah 2,067,270.00 111,632,580.00 SME
4 Area Alarm 3 Gas (O, A, V) 2.00 Set 24,127,260.00 48,254,520.00 -
5 Zona Valve 3 Gas (O, A, V) 2.00 Set 20,830,450.00 41,660,900.00 -

6 Pekerjaan Pipa menggunakan tembaga seamless


ASTM B-819 Tipe L, support pipa maksimal setiap 2m
pipa pada support dilindungi oleh bahan karet
Dia. 3/8" 605.00 mtr 54,240.00 32,815,200.00 BRASCO
Dia. 1/2" 605.00 mtr 80,060.00 48,436,300.00 BRASCO
Dia. 5/8" 60.00 mtr 113,670.00 6,820,200.00 BRASCO
Dia. 3/4" 230.00 mtr 140,590.00 32,335,700.00 BRASCO
Dia. 1" 200.00 mtr 218,840.00 43,768,000.00 BRASCO
Dia. 1-1/8" 50.00 mtr 250,730.00 12,536,500.00 BRASCO
Dia. 1-3/8" 50.00 mtr 343,980.00 17,199,000.00 BRASCO

PEKERJAAN IGM LANTAI ENAM


1 Wall Outlet Oxygen (O), pin index, push type 43.00 Buah 2,067,270.00 88,892,610.00 SME
2 Wall Outlet Compressed Air (A), pin index, push type 2.00 Buah 2,067,270.00 4,134,540.00 SME
3 Wall Outlet Vacuum (V), pin index, push type, slide base 43.00 Buah 2,067,270.00 88,892,610.00 SME
4 Area Alarm 3 Gas (O, A, V) 2.00 Set 24,127,260.00 48,254,520.00 -
5 Zona Valve 3 Gas (O, A, V) 2.00 Set 20,830,450.00 41,660,900.00 -
6 Pekerjaan Pipa menggunakan tembaga seamless
ASTM B-819 Tipe L, support pipa maksimal setiap 2m
pipa pada support dilindungi oleh bahan karet
Dia. 3/8" 605.00 mtr 54,240.00 32,815,200.00 BRASCO
Dia. 1/2" 605.00 mtr 80,060.00 48,436,300.00 BRASCO
Dia. 5/8" 60.00 mtr 113,670.00 6,820,200.00 BRASCO
Dia. 3/4" 230.00 mtr 140,590.00 32,335,700.00 BRASCO
Dia. 1" 200.00 mtr 218,840.00 43,768,000.00 BRASCO
Dia. 1-1/8" 50.00 mtr 250,730.00 12,536,500.00 BRASCO
Dia. 1-3/8" 50.00 mtr 343,980.00 17,199,000.00 BRASCO

PEKERJAAN IGM LANTAI TUJUH


1 Wall Outlet Oxygen (O), pin index, push type 35.00 Buah 2,067,270.00 72,354,450.00 SME
2 Wall Outlet Compressed Air (A), pin index, push type 2.00 Buah 2,067,270.00 4,134,540.00 SME
3 Wall Outlet Vacuum (V), pin index, push type, slide base 35.00 Buah 2,067,270.00 72,354,450.00 SME
4 Area Alarm 3 Gas (O, A, V) 2.00 Set 24,127,260.00 48,254,520.00 -
5 Zona Valve 3 Gas (O, A, V) 2.00 Set 20,830,450.00 41,660,900.00 -

6 Pekerjaan Pipa menggunakan tembaga seamless


ASTM B-819 Tipe L, support pipa maksimal setiap 2m
pipa pada support dilindungi oleh bahan karet
Dia. 3/8" 520.00 mtr 54,240.00 28,204,800.00 BRASCO
Dia. 1/2" 520.00 mtr 80,060.00 41,631,200.00 BRASCO
Dia. 5/8" 60.00 mtr 113,670.00 6,820,200.00 BRASCO
Dia. 3/4" 230.00 mtr 140,590.00 32,335,700.00 BRASCO
Dia. 1" 200.00 mtr 218,840.00 43,768,000.00 BRASCO
Dia. 1-1/8" 50.00 mtr 250,730.00 12,536,500.00 BRASCO
Dia. 1-3/8" 50.00 mtr 343,980.00 17,199,000.00 BRASCO
TOTAL PEKERJAAN INSTALASI GAS MEDIS

M BEDHEAD MEDICAL SERVICE


BEDHEAD PADA LANTAI SATU
I Ruang Isolasi
a. • Bedhead Single 1200
Unit; Tipe:
mm HD 2282 17.00 Unit 2,919,900.00 49,638,300.00 XA-FA
incl: power, switch & lamp T5
• 2 x Power Plug
• 1 x Power Switch
• 1 x T5 Fluoresent Lamp for Direct Light

M BEDHEAD PADA LANTAI DUA


II Perawatan ICU
a • Bedhead Single Unit 1800 mm 10.00 Unit 4,239,170.00 42,391,700.00 XA-FA
incl: power, switch & lamp T5
• 8 x Power Plug SNI
• 1 x Power SwitchSNI
• 1 x T5 Fluoresent Lamp for Direct Light

Perawatan HCU
b • Bedhead Single Unit 1800 mm 9.00 Unit 4,239,170.00 38,152,530.00 XA-FA
incl: power, switch & lamp T5
• 8 x Power Plug
• 1 x Power Switch
• 1 x T5 Fluoresent Lamp for Direct Light

Perawatan PICU
c • Bedhead Single Unit 1800 mm 8.00 Unit 4,239,170.00 33,913,360.00 XA-FA
incl: power, switch & lamp T5
• 8 x Power Plug
• 1 x Power Switch
• 1 x T5 Fluoresent Lamp for Direct Light

Perawatan NICU
d • Bedhead Single Unit 1800 mm 12.00 Unit 4,239,170.00 50,870,040.00 XA-FA
incl: power, switch & lamp T5
• 8 x Power Plug
• 1 x Power Switch
• 1 x T5 Fluoresent Lamp for Direct Light

BEDHEAD PADA LANTAI TIGA


III
Ruang Persiapan
a • Bedhead Single Unit 1200 mm 6.00 Unit 2,919,900.00 17,519,400.00 XA-FA
incl: power, switch & lamp T5
• 2 x Power Plug
• 1 x Power Switch
• 1 x T5 Fluoresent Lamp for Direct Light

Perawatan Recovery
b • Bedhead Single Unit 1200 mm 9.00 Unit 2,919,900.00 26,279,100.00 XA-FA
incl: power, switch & lamp T5
• 2 x Power Plug
• 1 x Power Switch
• 1 x T5 Fluoresent Lamp for Direct Light

BEDHEAD PADA LANTAI LIMA


IV Perawatan IRNA
a • Bedhead Single Unit 1200 mm 54.00 Unit 2,919,900.00 157,674,600.00 XA-FA
incl: power, switch & lamp T5
• 2 x Power Plug
• 1 x Power Switch
• 1 x T5 Fluoresent Lamp for Direct Light

BEDHEAD PADA LANTAI ENAM


V Perawatan IRNA
a • Bedhead Single Unit 1200 mm 44.00 Unit 2,919,900.00 128,475,600.00 XA-FA
incl: power, switch & lamp T5
• 2 x Power Plug
• 1 x Power Switch
• 1 x T5 Fluoresent Lamp for Direct Light
BEDHEAD PADA LANTAI TUJUH
V Perawatan IRNA
a • Bedhead Single Unit 1200 mm 35.00 Unit 2,919,900.00 102,196,500.00 XA-FA
incl: power, switch & lamp T5
• 2 x Power Plug
• 1 x Power Switch
• 1 x T5 Fluoresent Lamp for Direct Light
TOTAL PEKERJAAN BEDHEAD MEDICAL SERVICE

N PEKERJAAN PNEUMATIC TUBE SYSTEM

Multi Zone Pneumatic Tube System With Radio Frequency


Identification (RFID)
1 Zone and 12 station

PC and Main controller


A Technical Manual, english version
1 Personal Computer for Control and Monitoring, including: 1.00 set 101,088,360.00 101,088,360.00 AEROCOM
2 1 unit UPS for PC
1 set Original windows 7 OS (licensed)
1 set Original PTS Control Software (licensed)
3 Central Control Unit 1.00 set 38,694,310.00 38,694,310.00 AEROCOM
4 Steel Box for Central Control unit (max. 4 CCU inside) 1.00 set 6,225,700.00 6,225,700.00 AEROCOM
5 Programmer for RFID 1.00 set 15,989,150.00 15,989,150.00 AEROCOM

Stations, Power Pack & Diverter


6 Through Station OD 110 with 2 antenna RFID for sending & receiving, including: 6.00 unit 63,252,210.00 379,513,260.00 AEROCOM
1 unit Carrier rack for minimum 5 carriers
1 unit Receiving basket
1 unit Remote Arrival signal flashing& buzzing
7 Through-End Station OD 110 with 2 antenna RFID or sending & receiving, including: 4.00 unit 64,571,900.00 258,287,600.00 AEROCOM
1 unit Carrier rack for minimum 5 carriers
1 unit Receiving basket
1 unit Remote Arrival signal flashing& buzzing
8 End Station OD 110 with 2 antenna RFID or sending & receiving, including: 12.00 unit 47,486,510.00 569,838,120.00 AEROCOM
1 unit Carrier rack for minimum 5 carriers
1 unit Receiving basket
1 unit Remote Arrival signal flashing& buzzing
9 3-way diverter OD 110 with steel casing 8.00 unit 27,062,940.00 216,503,520.00 AEROCOM
10 Tube switch optical OD 110 8.00 unit 1,713,160.00 13,705,280.00 AEROCOM
11 Switching power pack 24VDC/5A 4.00 unit 13,902,250.00 55,609,000.00 AEROCOM

Laboratory Sending & Receiving Station, consist of:


12 Laboratory Table Station with 2 antenna RFID for sending & receiving, including: 2.00 unit 84,806,360.00 169,612,720.00 AEROCOM
1 set Receiving Guide rail basic set OD 110, r=650mm
1 set receiving Guide rail extension OD 110, l=1000mm
1 unit Remote Arrival signal flashing& buzzing
1 unit Wooden Table Integrated with the station
1 set Sending Funnel and Oerating Panel on top of the table
1 set Carrier Storage for minimum 5 carriers (integrated with the table)

Blower System
13 3-phase-blower 230/400 V 50 Hz, 5,5 A, including: 1.00 unit 93,780,300.00 93,780,300.00 AEROCOM
1 unit 3 way -valve device
1 unit Blower control unit 6,3-10,0A with 3-position-valve
1 set Installation-accessories for blower
1 unit Silencer OD 63 for blower
1 unit Slow speed device OD 110
1 unit Air-reduction OD 110 with carrier stop and bypass
1 piece Reduction OD 110/OD 63
2 m Airtube flexible OD 90/OD 110
2 m Airtube elbow OD 63

Tube & Accesories


14 Dispatch tube 110x2,3 mm, OD 110 Hard PVC grey 550.00 mtr 164,750.00 90,612,500.00 AEROCOM
15 Dispatch tube 110x2,3 mm, OD 110 transparent 88.00 mtr 661,580.00 58,219,040.00 AEROCOM
16 Dispatch bend 110x2,3 mm, OD 110 R800 Hard PVC grey 88.00 mtr 715,870.00 62,996,560.00 AEROCOM
17 Dispatch bend 110x2,3 mm, OD 110 R800 transparent 15.00 mtr 1,620,810.00 24,312,150.00 AEROCOM
18 Connecting Sleeve OD 110 L=110 mm Hard PVC 308.00 pcs 54,060.00 16,650,480.00 AEROCOM
19 Connecting Sleeve OD 110 L=150 mm, transparent 50.00 pcs 244,140.00 12,207,000.00 AEROCOM
20 Steel sleeve OD 110, L=100 mm 80.00 pcs 301,290.00 24,103,200.00 AEROCOM

21 Various Installation Material, including: 1.00 unit 43,163,190.00 43,163,190.00 AEROCOM


300 m Control cable 3x2x0,6 J-Y(ST)Y
300 m Power cable 3x2,5 NYM-J
300 pieces Cable strip grey up to OD 110
100 pieces Cable protector
6 can Tube adhesive, 1 kg
2 can Tube cleaner , 1 liter
162 pieces Tube clamp without rubber OD 110

Carrier & Accessories


Short Carrier OD 110, payload 80x245 mm, including: 120.00 unit 2,047,910.00 245,749,200.00 AEROCOM
1 piece Laboratory insert OD 110 for 18 vaccum tube
1 piece Laboratory insert OD 110 for 3 urine/faeces container
Instalasion & Comisioning 2.00 ls 91,631,410.00 183,262,820.00 -
TOTAL PEKERJAAN PNEUMATIC TUBE SYSTEM

O PEKERJAAN ELEVATOR

1 Type Bed Elevator 1.00 set 890,052,210.00 890,052,210.00 PILLAR/GMV


No. of Elevator L-1
Capacity 15 Person (1.000 kg)
Speed 60 mpm
Control System AC-VVVF
Operation System Simplex Selective Collective
No. of Stop 7 stops/ 7 opening
Service floor LT-1 s/d LT-7
Doors side opening
Entrance Opening 1.100 mm

Interior
rear Walls Stainless Steel Hairline finished
side Walls Stainless Steel Hairline finished
front return panel Stainless Steel Hairline finished
door Stainless Steel Hairline finished
lighting Fluorescent light
entrance column Stainless Steel Hairline finished
flooring Luckstrong
kick plate Stainless Steel Hairline finished
Door sill Extruded Hard Aluminium
ventilation Exhaust fan
faceplate Stainless Steel Hairline finished

Entrance :
hoistway door Stainless Steel Hairline finished
jamb Stainless Steel Hairline finished
landing sill Extruded Hard Aluminium
Signal Semua lantai
Power Supply 380 volt, 3 phase, 50 hz
Lighting 220 volt, 1 phase, 50 hz
ARD
Include Sparator beam (Structure for rail)

2 Type Bed Elevator 1.00 set 947,095,680.00 947,095,680.00 PILLAR/GMV


No. of Elevator L-2
Capacity 15 Person (1.000 kg)
Speed 60 mpm
Control System AC-VVVF
Operation System Simplex Selective Collective
No. of Stop 8 stops/ 8 opening
Service floor LT-1 s/d LT-atap
Doors side opening
Entrance Opening 1.100 mm

Interior
rear Walls Stainless Steel Hairline finished
side Walls Stainless Steel Hairline finished
front return panel Stainless Steel Hairline finished
door Stainless Steel Hairline finished
lighting Fluorescent light
entrance column Stainless Steel Hairline finished
flooring Luckstrong
kick plate Stainless Steel Hairline finished
Door sill Extruded Hard Aluminium
ventilation Exhaust fan
faceplate Stainless Steel Hairline finished

Entrance :
hoistway door Stainless Steel Hairline finished
jamb Stainless Steel Hairline finished
landing sill Extruded Hard Aluminium
Signal Semua lantai
Power Supply 380 volt, 3 phase, 50 hz
Lighting 220 volt, 1 phase, 50 hz
ARD
Include Sparator beam (Structure for rail)
3 Type Pasanger Elevator 1.00 set 649,078,790.00 649,078,790.00 PILLAR/GMV
No. of Elevator L-3
Capacity 8 Person (650 kg)
Speed 60 mpm
Control System AC-VVVF
Operation System Simplex Selective Collective
No. of Stop 8 stops/ 8 opening
Service floor LT-1 s/d LT-atap
Doors center opening
Entrance Opening 900 mm

Interior
rear Walls Stainless Steel Hairline finished
side Walls Stainless Steel Hairline finished
front return panel Stainless Steel Hairline finished
door Stainless Steel Hairline finished
lighting Fluorescent light
entrance column Stainless Steel Hairline finished
flooring Luckstrong
kick plate Stainless Steel Hairline finished
Door sill Extruded Hard Aluminium
ventilation Exhaust fan
faceplate Stainless Steel Hairline finished

Entrance :
hoistway door Stainless Steel Hairline finished
jamb Stainless Steel Hairline finished
landing sill Extruded Hard Aluminium
Signal Semua lantai
Power Supply 380 volt, 3 phase, 50 hz
Lighting 220 volt, 1 phase, 50 hz
ARD
Include Sparator beam (Structure for rail)

4 Instalasi, izin & testing comisioning 3.00 unit 62,082,250.00 186,246,750.00 -

5 Gondola Incl. pondasi


Type : Davit socket Arm 49.00 unit 10,075,160.00 493,682,840.00 -

6 PLATFORM 1.00 unit 18,162,720.00 18,162,720.00 -


Construction : 2000(L)x650(W)x1000(H)
Hollow squre steel shall be galvanized Wire mesh
Aluminium non slip surface 3 mm thick as landing working platform
7 HOIST (MOTOR CLIMBER) 2.00 unit 106,407,780.00 212,815,560.00 Power Climber
Merk : POWER CLIMBER
Type : ATLAS-700
Capacity : 700 kg/unit
Lifting speed : 9 m/min
Power Supply : 3Ph ;380V ; 50Hz; 1,3Kw
Safety : Slack rope safety device
Power failure : Brake release
Self weight : 40 kg/unit
Manufacture : Belgium
8 WIRE ROPE 100.00 m 106,300.00 10,630,000.00 -
Type : Galvanized
Diameter : 8,3 mm
Structure : 6x19+IWRC
B.Strength : 4.300 kg
Product : KOREA
9 CABLE POWER 50.00 m 120,120.00 6,006,000.00 Jembo
Type : NYYHY 5x2,5
Manufacture : JEMBO
10 PANEL CONTROL 1.00 unit 17,952,480.00 17,952,480.00 Telemecanique atau setara
Type : Weather proof
Components : Telemecanique
11 WIRE WINDER Including ELECTRIC MOTOR 2.00 unit 22,452,030.00 44,904,060.00 Motovario atau setara
Construction : Alumunium Alloy
Electric Motor : Motovario , ex. Italy
12 Safety Operator 2.00 unit 8,889,400.00 17,778,800.00 -
Nylon Rope Ø 16 mm @ 40 mt
Protection ® + Carabiner
Baju Harness Body + Helm
TOTAL PEKERJAAN ELEVATOR

PEKERJAAN GEDUNG IPRS, LINEN, DAN GIZI RSU


A PEKERJAAN ELEKTRIKAL
1 PEKERJAAN PANEL - PANEL
Pekerjaan Panel Lengkap
( Komponen Proteksi Sek.
1 Panel Distribusi Utama ( MDP ) 1.00 Unit 114,058,360.00 114,058,360.00 -
2 Panel LP/PP - 1 1.00 Unit 65,532,480.00 65,532,480.00 -
3 Panel LP/PP - 2 1.00 Unit 11,414,420.00 11,414,420.00 -
4 Panel LP/PP - 3 1.00 Unit 10,489,520.00 10,489,520.00 -
5 Panel LP/PP - 4 1.00 Unit 15,263,990.00 15,263,990.00 -
6 Panel Outdoor AC 1.00 Unit 26,689,460.00 26,689,460.00 -
7 Panel Kontrol Pompa Air Bersih 1.00 Unit 5,641,320.00 5,641,320.00 -
8 Panel Power Lift 1.00 Unit 3,198,850.00 3,198,850.00 -
9 Panel Power Dumb Waiter 1.00 Unit 2,257,240.00 2,257,240.00 -

INSTALASI KABEL FEEDER


Instalasi Kabel Feeder Antara Panel
( Kabel Sek. Supreme, Lengkap Galian + Urugan, Testing & Commisioning )
1 NYY 2x (4 x 1C x300 mm2 + NYA 16 mm2 ( MDP ke PP/LP -1) 64.00 M' 154,640.00 9,896,960.00 Supreme atau setara
2 NYY 4 x 16 mm2 + NYA 16 mm2 ( MDP ke PP/LP - 2 ) 8.00 M' 154,640.00 1,237,120.00 Supreme atau setara
3 NYY 4 x 25 mm2 + NYA 16 mm2 ( MDP ke PP/LP - 3 ) 12.00 M' 168,400.00 2,020,800.00 Supreme atau setara
4 NYY 4 x 25 mm2 + NYA 16 mm2 ( SDP ke PP/LP - 4 ) 18.00 M' 168,400.00 3,031,200.00 Supreme atau setara
5 NYY 4 x 25 mm2 + NYA 16 mm2 ( MDP ke PP - LIFT) 52.00 M' 168,400.00 8,756,800.00 Supreme atau setara
6 NYY 4 x 50 mm2 + NYA 35 mm2 ( MDP ke PP - AC Outdoor) 58.00 M' 288,040.00 16,706,320.00 Supreme atau setara
7 NYY 4 x 16 mm2+PVC dia 1,5" ( MDP KE PP Pompa ) 64.00 M' 94,580.00 6,053,120.00 Supreme atau setara
8 NYFGBY 3 x (4 x 300 mm2) (LVMDP ke MDP Gedung) + galian dan Urugan (vol x 3) 558.00 M' 1,633,830.00 911,677,140.00 Supreme atau setara
9 NYY 4 x 150 mm2 ( MDP ke Panel Hydrant ) 64.00 M' 784,620.00 50,215,680.00 Supreme atau setara
10 Penambahan Daya listrik 240 KVA lengkap SLO + Peralatan Listrik 240.00 Kva 1,459,410.00 350,258,400.00 -
11 Penambahan MCCB 500-1250A 70kA di LVMDP existing 1.00 unit 38,899,680.00 38,899,680.00 -
JUMLAH TOTAL PEKERJAAN PANEL DAN KABEL FEEDER

2 PEKERJAAN INSTALASI LISTRIK


Instalasi Kabel NYM 3 x 2,5 mm2 Lengkap Conduit Dia. 20 mm
( Kabel Sek. Supreme, Conduit Sek. EGA ), Lampu Sek. Artolite, Philips Saklar & Stop Kontak Sek. Legrand, Lengkap
LANTAI 1

1 Instalasi Titik Penerangan 3 x 2,5 mm2 + Pipa Conduit dia 20 mm 50.00 Ttk 310,890.00 15,544,500.00 Supreme atau setara
2 Instalasi Titik Stop Kontak 3 x 2,5 mm2 + Pipa Conduit dia 20 mm 18.00 Ttk 320,440.00 5,767,920.00 Supreme atau setara
3 TL LED 2 x 16 W, type RMO 33.00 Bh 410,070.00 13,532,310.00 Philips atau setara
4 TL LED 1 x 16 W, type Balk 2.00 Bh 251,410.00 502,820.00 Philips atau setara
5 TL LED 1 x 8 W, type Balk 2.00 Bh 200,180.00 400,360.00 Philips atau setara
6 Down Light LED 10 W 8.00 Bh 141,900.00 1,135,200.00 Philips atau setara
7 Down Light LED 7 W 4.00 Bh 133,030.00 532,120.00 Philips atau setara
8 Baterai Nicad c/w Charger utk Back Up Power lampu 3.00 Bh 685,390.00 2,056,170.00 -
9 Exit Lamp LED 10W c/w Baterai Nicad 1.00 Bh 799,590.00 799,590.00 -
10 Saklar Tunggal, 10 A, 230 V 10.00 Bh 30,340.00 303,400.00 Philips atau setara
11 Saklar Ganda, 10 A, 230 V 6.00 Bh 31,320.00 187,920.00 Philips atau setara
12 Saklar Tukar, 10 A, 230 V 1.00 Bh 51,690.00 51,690.00 Philips atau setara
13 Kotak Kontak 1 Fasa, 16 A, 230 V dipasang di dinding 18.00 Bh 44,270.00 796,860.00 -
14 Kotak Kontak Industrial 3 Fasa, 63 A, 3P+N+E dipasang di dinding 4.00 Bh 1,240,530.00 4,962,120.00 -
15 Kotak Kontak Industrial 3 Fasa, 125 A, 3P+N+E dipasang di dinding 5.00 Bh 1,524,860.00 7,624,300.00 -
16 NYY 4 x 25 mm2 + NYA 16 mm2 ( Kotak Kontak ke PP/LP - 1 ) 64.00 M' 168,450.00 10,780,800.00 Supreme atau setara
17 NYY 4 x 35 mm2 + NYA 25 mm2 ( Kotak Kontak ke PP/LP - 1 ) 72.00 M' 219,710.00 15,819,120.00 Supreme atau setara
18 NYY 4 x 50 mm2 + NYA 35 mm2 ( Kotak Kontak ke PP/LP - 1 ) 26.00 M' 288,020.00 7,488,520.00 Supreme atau setara
19 Cable Tray 300x100 mm + accesories 30.00 M' 283,400.00 8,502,000.00 -
20 Cable Tray 200x100 mm + accesories 30.00 M' 251,320.00 7,539,600.00 -
21 Instalasi Titik Exhaust Fan c/w Saklar Dan Listrik Indoor AC 18.00 Ttk 310,890.00 5,596,020.00 -

LANTAI 2
1 Instalasi Titik Penerangan 3 x 2,5 mm2 + Pipa Conduit dia 20 mm 49.00 Ttk 310,890.00 15,233,610.00 Supreme atau setara
2 Instalasi Titik Stop Kontak 3 x 2,5 mm2 + Pipa Conduit dia 20 mm 21.00 Ttk 320,440.00 6,729,240.00 Supreme atau setara
3 TL LED 2 x 16 W, type RMO 27.00 Bh 410,070.00 11,071,890.00 Philips atau setara
4 TL LED 1 x 8 W, type Balk 3.00 Bh 200,180.00 600,540.00 Philips atau setara
5 Down Light LED 10 W 11.00 Bh 141,900.00 1,560,900.00 Philips atau setara
6 Down Light LED 7 W 6.00 Bh 133,030.00 798,180.00 Philips atau setara
7 Baterai Nicad c/w Charger utk Back Up Power lampu 3.00 Bh 685,390.00 2,056,170.00 -
8 Exit Lamp LED 10W c/w Baterai Nicad 2.00 Bh 799,590.00 1,599,180.00 -
9 Saklar Tunggal, 10 A, 230 V 16.00 Bh 30,340.00 485,440.00 Philips atau setara
10 Saklar Ganda, 10 A, 230 V 10.00 Bh 31,320.00 313,200.00 Philips atau setara
11 Saklar Tukar, 10 A, 230 V 2.00 Bh 51,690.00 103,380.00 Philips atau setara
12 Kotak Kontak 1 Fasa, 16 A, 230 V dipasang di dinding 21.00 Bh 44,270.00 929,670.00 -
13 Kotak Kontak Industrial 3 Fasa, 16 A, 3P+N+E dipasang di dinding 4.00 Bh 393,250.00 1,573,000.00 -
14 NYY 4 x 6 mm2 + NYA 6 mm2 ( Kotak Kontak ke PP/LP - 2 ) 96.00 M' 78,730.00 7,558,080.00 Supreme atau setara
15 Cable Tray 300x100 mm + accesories 30.00 M' 283,400.00 8,502,000.00 -
16 Cable Tray 200x100 mm + accesories 30.00 M' 251,320.00 7,539,600.00 -
17 Instalasi Titik Exhaust Fan c/w Saklar Dan Listrik Indoor AC 16.00 Ttk 310,890.00 4,974,240.00 -

LANTAI 3
1 Instalasi Titik Penerangan 3 x 2,5 mm2 + Pipa Conduit dia 20 mm 61.00 Ttk 310,890.00 18,964,290.00 -
2 Instalasi Titik Stop Kontak 3 x 2,5 mm2 + Pipa Conduit dia 20 mm 40.00 Ttk 320,440.00 12,817,600.00 -
3 TL LED 2 x 16 W, type RM Alumunium Grille 24.00 Bh 594,090.00 14,258,160.00 -
4 TL LED 2 x 16 W, type RMO 12.00 Bh 410,070.00 4,920,840.00 -
5 TL LED 1 x 16 W, type Balk 2.00 Bh 251,410.00 502,820.00 -
6 TL LED 1 x 8 W, type Balk 11.00 Bh 200,180.00 2,201,980.00 -
7 Down Light LED 10 W 6.00 Bh 141,900.00 851,400.00 -
8 Down Light LED 7 W 4.00 Bh 133,030.00 532,120.00 -
9 Baterai Nicad c/w Charger utk Back Up Power lampu 4.00 Bh 685,390.00 2,741,560.00 -
10 Exit Lamp LED 10W c/w Baterai Nicad 2.00 Bh 799,590.00 1,599,180.00 -
11 Saklar Tunggal, 10 A, 230 V 16.00 Bh 30,340.00 485,440.00 -
12 Saklar Ganda, 10 A, 230 V 10.00 Bh 31,320.00 313,200.00 -
13 Saklar Tukar, 10 A, 230 V 1.00 Bh 51,690.00 51,690.00 -
14 Kotak Kontak 1 Fasa, 16 A, 230 V dipasang di dinding 40.00 Bh 44,270.00 1,770,800.00 -
15 Cable Tray 300x100 mm + accesories 30.00 M' 283,400.00 8,502,000.00 -
16 Cable Tray 200x100 mm + accesories 30.00 M' 251,320.00 7,539,600.00 -
17 Instalasi Titik Exhaust Fan c/w Saklar Dan Listrik Indoor AC 22.00 Ttk 310,890.00 6,839,580.00 -

LANTAI 4
1 Instalasi Titik Penerangan 3 x 2,5 mm2 + Pipa Conduit dia 20 mm 48.00 Ttk 310,890.00 14,922,720.00 -
2 Instalasi Titik Stop Kontak 3 x 2,5 mm2 + Pipa Conduit dia 20 mm 28.00 Ttk 320,440.00 8,972,320.00 -
3 TL LED 2 x 16 W, type RMO 28.00 Bh 410,070.00 11,481,960.00 -
4 TL LED 1 x 8 W, type Balk 3.00 Bh 200,180.00 600,540.00 -
5 Down Light LED 10 W 9.00 Bh 141,900.00 1,277,100.00 -
6 Down Light LED 7 W 6.00 Bh 133,030.00 798,180.00 -
7 Baterai Nicad c/w Charger utk Back Up Power lampu 3.00 Bh 685,390.00 2,056,170.00 -
8 Exit Lamp LED 10W c/w Baterai Nicad 2.00 Bh 799,590.00 1,599,180.00 -
9 Saklar Tunggal, 10 A, 230 V 16.00 Bh 30,340.00 485,440.00 -
10 Saklar Ganda, 10 A, 230 V 10.00 Bh 51,580.00 515,800.00 -
11 Saklar Tukar, 10 A, 230 V 2.00 Bh 51,690.00 103,380.00 -
12 Kotak Kontak 1 Fasa, 16 A, 230 V dipasang di dinding 28.00 Bh 44,270.00 1,239,560.00 -
13 Kotak Kontak Industrial 1 Fasa, 32 A, 1P+N+E dipasang di dinding 1.00 Bh 290,300.00 290,300.00 -
14 NYY 3 x 16 mm 2 ( Kotak Kontak ke PP/LP - 2 ) 96.00 M' 78,730.00 7,558,080.00 -
15 Cable Tray 300x100 mm + accesories 30.00 M' 283,400.00 8,502,000.00 -
16 Cable Tray 200x100 mm + accesories 30.00 M' 251,320.00 7,539,600.00 -
17 Instalasi Titik Exhaust Fan c/w Saklar Dan Listrik Indoor AC 16.00 Ttk 310,890.00 4,974,240.00 -
18 Instalasi Penangkap Petir c./w instalasi dan Grounding 1.00 unit 16,998,280.00 16,998,280.00 -

JUMLAH TOTAL PEKERJAAN INSTALASI LISTRIK

3 PEKERJAAN INSTALASI FIRE ALARM

LANTAI 1
1 Instalasi Titik Fire Alarm NYM 2 x 1,5 mm2 + Pipa Conduit 20 mm EGA 17.00 Ttk 238,060.00 4,047,020.00 -
2 Smoke Detector Type Foto Electrik 8.00 Bh 292,420.00 2,339,360.00 hooseki atau setara
3 Heat Detector Type Rite Of Rise (ROR) c/w Base 3.00 Bh 280,950.00 842,850.00 hooseki atau setara
4 Alarm Bell 2.00 Bh 248,820.00 497,640.00 -
5 Manual Call Point 2.00 Bh 266,600.00 533,200.00 -
6 Fire Indicating Lamp 2.00 Bh 452,340.00 904,680.00 -
7 Terminal Box Utama Fire Alarm 1.00 Unit 1,184,540.00 1,184,540.00 -
8 Master Control Fire Alarm ( MCFA ) 4 Zone 1.00 Unit 5,940,780.00 5,940,780.00 hooseki atau setara
9 Kabel ke MDF NYA 2 x 1,5 mm2 + Conduit 20 mm 40.00 M' 25,740.00 1,029,600.00 -

LANTAI 2
1 Instalasi Titik Fire Alarm NYM 2 x 1,5 mm2 + Pipa Conduit 20 mm EGA 22.00 Ttk 292,420.00 6,433,240.00 -
2 Smoke Detector Type Foto Electrik 13.00 Bh 280,950.00 3,652,350.00 hooseki atau setara
3 Heat Detector Type Rite Of Rise (ROR) c/w Base 3.00 Bh 266,600.00 799,800.00 hooseki atau setara
4 Alarm Bell 2.00 Bh 248,820.00 497,640.00 -
5 Manual Call Point 2.00 Bh 248,820.00 497,640.00 -
6 Fire Indicating Lamp 2.00 Bh 266,600.00 533,200.00 -
7 Terminal Box Fire Alarm 1.00 Unit 452,340.00 452,340.00 -
8 Kabel ke MDF NYA 2 x 1,5 mm2 + Conduit 20 mm 40.00 M' 1,184,540.00 47,381,600.00 -

LANTAI 3
1 Instalasi Titik Fire Alarm NYM 2 x 1,5 mm2 + Pipa Conduit 20 mm EGA 34.00 Ttk 292,420.00 9,942,280.00 -
2 Smoke Detector Type Foto Electrik 12.00 Bh 280,950.00 3,371,400.00 hooseki atau setara
3 Heat Detector Type Rate Of Rise (ROR) c/w Base 2.00 Bh 266,600.00 533,200.00 hooseki atau setara
4 Alarm Bell 2.00 Bh 248,820.00 497,640.00 -
5 Manual Call Point 2.00 Bh 248,820.00 497,640.00 -
6 Fire Indicating Lamp 2.00 Bh 266,600.00 533,200.00 -
7 Terminal Box Fire Alarm 1.00 Unit 452,340.00 452,340.00 -
8 Kabel MDF NYA 2 x 1,5 mm2 + Conduit 20 mm 40.00 M' 1,184,540.00 47,381,600.00 -

LANTAI 4 dan ATAP


1 Instalasi Titik Fire Alarm NYM 2 x 1,5 mm2 + Pipa Conduit 20 mm EGA 34.00 Ttk 292,420.00 9,942,280.00 -
2 Smoke Detector Type Foto Electrik 6.00 Bh 280,950.00 1,685,700.00 -
3 Heat Detector Type Rate Of Rise (ROR) c/w Base 2.00 Bh 266,600.00 533,200.00 hooseki atau setara
4 Heat Detector Type Fixed Temperature c/w Base 4.00 Bh 329,020.00 1,316,080.00 hooseki atau setara
5 Alarm Bell 3.00 Bh 248,820.00 746,460.00 -
6 Manual Call Point 3.00 Bh 248,820.00 746,460.00 -
7 Fire Indicating Lamp 3.00 Bh 266,600.00 799,800.00 -
8 Terminal Box Fire Alarm 1.00 Unit 452,340.00 452,340.00 -
9 Kabel MDF NYA 2 x 1,5 mm2 + Conduit 20 mm 40.00 M' 280,950.00 11,238,000.00 -

JUMLAH TOTAL PEKERJAAN INSTALASI FIRE ALARM

4 PEKERJAAN INSTALASI TELEPON

Instalasi Telepon, Kabel ITC 2 x 2 x 0,6 mm2 + Conduit Dia. 20mm ( Kabel Sek. Supreme, Counduit Sek. EGA), Outlet Sek. LEGRAND,

LANTAI 1
1 Instalasi Titik Telepon ITC 2 x 2 x 0,6 mm2 + Pipa Conduit 20 mm EGA 1.00 Ttk 217,640.00 217,640.00 ITC + EGA atau setara
2 Outlet Telepon RJ 11 1.00 Bh 59,560.00 59,560.00 -
3 Terminal Box Utama ( MDF) 1.00 Unit 457,030.00 457,030.00 -
4 Kabel ITC 20 pairs MDF Gedung - TLP Ke MDF Existing 150.00 M' 79,230.00 11,884,500.00 -

LANTAI 2
1 Instalasi Titik Telepon ITC 2 x 2 x 0,6 mm2 + Pipa Conduit 20 mm EGA 4.00 Ttk 217,640.00 870,560.00 ITC + EGA atau setara
2 Outlet Telepon RJ 11 4.00 Bh 59,560.00 238,240.00 -
3 Terminal Box 1.00 Unit 319,920.00 319,920.00 -
4 Kabel ITC 10 pair TB - TLP Ke MDF 10.00 mtr 59,890.00 598,900.00 -

LANTAI 3
1 Instalasi Titik Telepon ITC 2 x 2 x 0,6 mm2 + Pipa Conduit 20 mm EGA 6.00 Ttk 217,640.00 1,305,840.00 ITC + EGA atau setara
2 Outlet Telepon RJ 11 6.00 Bh 59,560.00 357,360.00 -
3 Terminal Box 1.00 Unit 319,920.00 319,920.00 -
4 Kabel ITC 10 pair TB - TLP Ke MDF 20.00 M' 59,890.00 1,197,800.00 -

LANTAI 4
1 Instalasi Titik Telepon ITC 2 x 2 x 0,6 mm2 + Pipa Conduit 20 mm EGA 4.00 Ttk 217,640.00 870,560.00 ITC + EGA atau setara
2 Outlet Telepon RJ 11 4.00 Bh 59,560.00 238,240.00 -
3 Terminal Box 1.00 Unit 319,920.00 319,920.00 -
4 Kabel ITC 10 pair TB - TLP Ke MDF 30.00 M' 59,890.00 1,796,700.00 -
JUMLAH TOTAL PEKERJAAN INSTALASI TELEPON
5 PEKERJAAN INSTALASI TATA SUARA
Instalasi Tata Suara , NYMHY 2 x 1,5 mm2 + Conduit 20 mm
( Kabel Sek. Supreme, Conduit Sek. EGA ), Perangkat Tata Suara Sek. TOA, Lengkap Test Commisioning

LANTAI 1
1 Instalasi Tata Suara NYMHY 2 x 1.5 mm + PVC dia 20" 14.00 Unit 227,520.00 3,185,280.00 Supreme atau setara
2 Ceilling Speaker 3 w c/w Box (Surface Mounting) 8.00 Unit 159,980.00 1,279,840.00 TOA atau setara
3 Coloumn Speaker 10 w 2.00 Unit 499,470.00 998,940.00 TOA atau setara
4 Volume Control 4.00 Unit 59,730.00 238,920.00 TOA atau setara
5 Terminal Box ( TB - SS ) 1.00 Unit 362,810.00 362,810.00 -
6 Kabel NYMHY 2 x 1,5 mm2 + Conduit 20mm ( dari TB-SS Ke MDF ) 40.00 M' 18,420.00 736,800.00 Supreme atau setara

LANTAI 2
1 Instalasi Tata Suara NYMHY 2 x 1.5 mm + PVC dia 20" 12.00 Unit 227,520.00 2,730,240.00 Supreme atau setara
2 Ceilling Speaker 3 w 8.00 Unit 159,980.00 1,279,840.00 TOA atau setara
3 Volume Control 4.00 Unit 237,360.00 949,440.00 TOA atau setara
4 Terminal Box Utama ( MDF ) 1.00 Unit 728,080.00 728,080.00 TOA atau setara
5 Perangkat Utama Tata Suara terdiri dari :
6 - Paging Microfone 1.00 Unit 2,361,230.00 2,361,230.00 TOA atau setara
7 - Mixer System Pre Amplifier 120w 1.00 Unit 3,243,870.00 3,243,870.00 TOA atau setara
8 - Power Amplifier 120 w 1.00 Unit 3,277,160.00 3,277,160.00 TOA atau setara
9 - CD - MP3 Player 1.00 Unit 3,090,260.00 3,090,260.00 TOA atau setara
10 - Equalizer 1.00 Unit 4,112,800.00 4,112,800.00 TOA atau setara
11 - Audio Rack C/W Stop Kontak dan Instalasi Perangkat 1.00 Unit 3,648,510.00 3,648,510.00 TOA atau setara

LANTAI 3
1 Instalasi Tata Suara NYMHY 2 x 1.5 mm + PVC dia 20" 13.00 Unit 227,520.00 2,957,760.00 Supreme atau setara
2 Ceilling Speaker 3 w c/w Box (Surface Mounting) 8.00 Unit 159,980.00 1,279,840.00 TOA atau setara
3 Volume Control 4.00 Unit 237,360.00 949,440.00 TOA atau setara
4 Terminal Box ( TB - SS ) 1.00 Unit 362,810.00 362,810.00 TOA atau setara
5 Kabel NYMHY 2 x 1,5 mm2 + Conduit 20mm ( dari TB-SS Ke MDF ) 60.00 M' 18,420.00 1,105,200.00 Supreme atau setara

LANTAI 4
1 Instalasi Tata Suara NYMHY 2 x 1.5 mm + PVC dia 20" 10.00 Unit 3,277,160.00 32,771,600.00 Supreme atau setara
2 Ceilling Speaker 3 w c/w Box (Surface Mounting) 7.00 Unit 3,090,260.00 21,631,820.00 TOA atau setara
3 Volume Control 3.00 Unit 237,360.00 712,080.00 TOA atau setara
4 Terminal Box ( TB - SS ) 1.00 Unit 362,810.00 362,810.00 TOA atau setara
5 Kabel NYMHY 2 x 1,5 mm2 + Conduit 20mm ( dari TB-SS Ke MDF ) 60.00 M' 18,420.00 1,105,200.00 Supreme atau setara

JUMLAH TOTAL PEKERJAAN INSTALASI TATA SUARA

6 PEKERJAAN INSTALASI KABEL DATA KOMPUTER


Instalasi Kabel Data
Outlet Sek. LEGRAND Lengkap Cord , Testing & Commisioning

LANTAI 1
1 Instalasi Cable Data Category 6 Sek. Belden Dalam Conduit dia 20 mm 2.00 Ttk 503,930.00 1,007,860.00 Belden atau setara
2 Outlet Data RJ 45, Category 6 2.00 Bh 207,020.00 414,040.00 -
3 Wall Mounting Cabinets Lebar 600 x Tinggi 500 x Tebal 400 1.00 Unit 4,071,120.00 4,071,120.00 Fortuna atau setara
4 Sek. Fortuna
5 Instalasi Cable Data Category 6 Sek. Belden Dalam Conduit dia 20 mm 200.00 M' 23,050.00 4,610,000.00 Belden atau setara
6 Dari Cabinets ke. R. Server
7 Switch kap.16 port, 1000 mbps 1.00 unit 2,542,730.00 2,542,730.00 tplink atau setara

LANTAI 2
1 Instalasi Cable Data Category 6 Sek. Belden Dalam Conduit dia 20 mm 4.00 Ttk 503,930.00 2,015,720.00 Belden atau setara
2 Outlet Data RJ 45 sek Legrand , Category 6 4.00 Bh 207,020.00 828,080.00 -
3 Wall Mounting Cabinets Lebar 600 x Tinggi 500 x Tebal 400 1.00 Unit 4,071,120.00 4,071,120.00 Fortuna atau setara
4 Switch kap.16 port, 1000 mbps 1.00 unit 2,539,650.00 2,539,650.00 tplink atau setara
5 Switch kap.16 port, 1000 mbps

LANTAI 3
1 Instalasi Cable Data Category 6 Sek. Belden Dalam Conduit dia 20 mm 6.00 Ttk 503,930.00 3,023,580.00 Belden atau setara
2 Outlet Data RJ 45 sek Legrand , Category 6 6.00 Bh 207,020.00 1,242,120.00 -
3 Wall Mounting Cabinets Lebar 600 x Tinggi 500 x Tebal 400 1.00 Unit 4,071,120.00 4,071,120.00 Fortuna atau setara
4 Switch kap.16 port, 1000 mbps 1.00 unit 2,539,650.00 2,539,650.00 tplink atau setara

LANTAI 4
1 Instalasi Cable Data Category 6 Sek. Belden Dalam Conduit dia 20 mm 4.00 Ttk 503,930.00 2,015,720.00 Belden atau setara
2 Outlet Data RJ 45 sek Legrand , Category 6 4.00 Bh 207,020.00 828,080.00 -
3 Wall Mounting Cabinets Lebar 600 x Tinggi 500 x Tebal 400 1.00 Unit 4,071,120.00 4,071,120.00 Fortuna atau setara
4 Switch kap.16 port, 1000 mbps 1.00 unit 2,539,650.00 2,539,650.00 tplink atau setara

JUMLAH TOTAL PEKERJAAN INSTALASI KABEL DATA

7 PEKERJAAN INSTALASI CCTV


Kabel Data Cat 6 , dan Kabel Power Lengkap Switch
( Di tarik Ke Ruang Kontrol )

LANTAI 1
-CCTV system equipments 2.00 unit 2,672,690.00 5,345,380.00 Uniview/Tandy atau setara
CCTV Dome camera fixed indoor type camera built in
Variable vocal lens 2,8-6,0 mm with 12 volt DC adaptor
sek. Panasonic, Bosch
Instalasi kabel data 2.00 ttk 1,369,550.00 2,739,100.00 -

LANTAI 2
CCTV system equipments
CCTV Dome camera fixed indoor type camera built in 2.00 unit 2,691,040.00 5,382,080.00 Uniview/Tandy atau setara
Variable vocal lens 2,8-6,0 mm with 12 volt DC adaptor
sek. Panasonic, Bosch
Network Video Recorder (NVR) 8 Channel , hardisk 1 TB 1.00 unit 15,094,860.00 15,094,860.00 Uniview/Tandy atau setara
LCD TV Monitor 24" (Multiscreen+Spot) 1.00 unit 4,099,670.00 4,099,670.00 -
Instalasi kabel data 2.00 ttk 1,370,940.00 2,741,880.00 -

LANTAI 3
CCTV system equipments
CCTV Dome camera fixed indoor type camera built in 2.00 unit 2,691,040.00 5,382,080.00 Uniview/Tandy atau setara
Variable vocal lens 2,8-6,0 mm with 12 volt DC adaptor
sek. Panasonic, Bosch
Instalasi kabel data 2.00 ttk 1,370,940.00 2,741,880.00 -
LANTAI 4
CCTV system equipments 2.00 unit 2,691,040.00 5,382,080.00 Uniview/Tandy atau setara
CCTV Dome camera fixed indoor type camera built in
Variable vocal lens 2,8-6,0 mm with 12 volt DC adaptor
type WV-CF 284 , Panasonic
Instalasi kabel data 2.00 ttk 1,370,940.00 2,741,880.00 -

JUMLAH TOTAL PEKERJAAN INSTALASI CCTV

B PEKERJAAN PLUMBING / SANITASI / ME


1 PEKERJAAN PLUMBING
Pengadaan & Pemasangan Inst. Pompa 2, Pressure Tank, Septic Tank, Air Bersih, Air Panas, Air Bekas/ Kotor,
Instalasi Air Bersih
Ruang Pompa
a Ruang Pompa
a.1 Pompa Transfer 01-02 Air Bersih 2.00 Unit 15,036,120.00 30,072,240.00 Ebarra/Shanghai Kaiquan atau setara
Body and Support Cast Iron, Shaft Stainless Steel
High Quality, Mekanikal Seal, IP 44 Proteksi, Class F
Fan Cover in Press Steel Sheet, Accessories, dll
Type : Vertical Multistage
Cap : 100 LPM
Rotary : 1450 Rpm
Head : 40 M
Power : 1.5 KW /1Phs/50 Hz
Max Temp : 80° Celcius
Lengkap dengan
Panel Control Lengkap dng Wirring, Contactor/thermal Relay,
Change Over Switch, Automatic/manual Operation
Low Tension Transpormer, Electronic Sensor
Level min/max-WLC.
Accessories Pump : Base Plate and Mounting,
a.2 Control Valve & Acessories
Gate valve Ø 65mm 2.00 Bh 3,094,710.00 6,189,420.00 -
Strainer Ø 80mm 2.00 Bh 2,627,650.00 5,255,300.00 -
Check valve Ø 65mm 2.00 Bh 3,053,130.00 6,106,260.00 -
Foot Valve Ø 80 mm 2.00 Bh 3,427,520.00 6,855,040.00 -
Floating valve Ø 50 mm 1.00 Bh 1,023,050.00 1,023,050.00 -
Floating valve Ø 25 mm 1.00 Bh 426,290.00 426,290.00 -
Flexible Joint Ø 80 mm 2.00 Bh 880,040.00 1,760,080.00 -
Flexible Joint Ø 65 mm 2.00 Bh 818,220.00 1,636,440.00 -
Presure gauge 1.00 Bh 326,160.00 326,160.00 -
Fittings 1.00 Ls 2,973,690.00 2,973,690.00 -
a.3 Instalasi Pipa Distribusi Ruang Pompa
GIP Class Medium Lengkap sambungan,
bracket, hanger dan acesories.
Ø 80 mm 18.00 m' 411,280.00 7,403,040.00 -
Ø 65 mm 18.00 m' 327,380.00 5,892,840.00 -
Fittings 1.00 Ls 361,550.00 361,550.00 -
Hanger & Support 1.00 Ls 275,230.00 275,230.00 -

Site Plan
a. Deep well 1.00 Unit 511,820,930.00 511,820,930.00 -
a.1. Pengeboran dan Instalsi
- Biaya pengeboran Ø 200-250 mm sedalam 200 m'
- Pipa jambang/chasing PVC AW Ø 150-200 mm
- Pipa discharge/hisap pompa GIP sch 40 Ø 65 mm
- Well screen Ø100 mm Low carbon
- Fitting-fiting
- Reduser dan Well seal
- Gravel pack (Sepanjang lubang bor)
- Material bantu
- Biaya Test dan commissioning
- Biaya Analisa Air Lab.
- Geolistrik Lapangan Radius 150 M
- Perijinan
a.2. Deep well Pump
Type : 6" Bore Hole Sumbmersible
Cap : 600 Ltr/Menit
atau 48 m3 / jam
Rotary : 1450 Rpm
Head : 8 m
Power : 2.2 KW/380V/3Phs/50 Hz
Max. Tem : 80° Celcius
- Panel box otomatis, grounding & accessories
- Biaya Pengrsan Izin & Pengwsan Terpadu SIB & SIPA
- Biaya Pengwsan Terpadu Dinas Pertambangan & DGTL
a.3. Control Valve & Cabling
- Gate valve Ø 50mm
- Strainer Ø 50 mm
- Flexible joint Ø50 mm
- Check Valve Ø50 mm
- Flange Ø50
- Water Meter Ø 50 mm
- Stick Electrode
- Kabel Daya dan Kabel Kontrol ke Panel :
NYY 3x4 mm
NYY/WLC 3x2.5 mm
a.4. Sipil dan Finishing
- Bak kontrol uk. 500 x 1500 mm (Beton + pelat bordes)
- Lapisan pasir beton (grouting) sedalam 30 m
- Biaya Perijinan dan pasang baru PDAM 1.00 ls 4,859,270.00 4,859,270.00 -
a.5. Instalasi Pipa Air Bersih PDAM ke shaft bangunan PPR PN-10 Lengkap sambungan, bracket, galian 160.00 m' 219,160.00 35,065,600.00 -
a.6. Instalasi Pipa Air Bersih deep well - 1 ke GWT
- Lengkap sambungan, bracket, galian , urugan dan accesories.Ø 50 mm 52.00 m' 219,160.00 11,396,320.00 -
b. Fittings 1.00 Ls 1,359,460.00 1,359,460.00 -
c. Hanger & Support 1.00 Ls 366,930.00 366,930.00 -
d. Gate valve :
- Gate valve Ø 50mm 1.00 Bh 1,327,880.00 1,327,880.00 -
e. Water Meter
- Water Meter Ø 50mm 1.00 Bh 1,706,060.00 1,706,060.00 -

Lantai 1
a.1. Instalasi Pipa Air Bersih dari pipa tegak
PPR PN-10,Lengkap sambungan, bracket, hanger dan acesories.
- Ø 50 mm 9.00 m' 200,520.00 1,804,680.00 -
- Ø 40 mm 11.00 m' 141,420.00 1,555,620.00 -
- Ø 32 mm 9.00 m' 97,370.00 876,330.00 -
a.2. Fittings 1.00 Ls 731,240.00 731,240.00 -
a.3. Hanger & Support 1.00 Ls 365,760.00 365,760.00 -
b.1. Instalasi Pipa Air Bersih area Toilet
PPR PN-10
Lengkap sambungan, bracket, hanger dan acesories.
- Ø 32 mm 3.00 m' 97,370.00 292,110.00 -
- Ø 25 mm 5.00 m' 74,500.00 372,500.00 -
- Ø 20 mm 15.00 m' 50,730.00 760,950.00 -
- Ø 15 mm 10.00 m' 45,040.00 450,400.00 -
b.2. Fittings 1.00 Ls 731,240.00 731,240.00 -
b.3. Hanger & Support 1.00 Ls 365,760.00 365,760.00 -
b.4. Gate valve :
- Gate valve Ø 32mm 1.00 Bh 688,870.00 688,870.00 -
c.1. Instalasi Pipa Air Bersih area Cuci Troli
PPR PN-10
Lengkap sambungan, bracket, hanger dan acesories.
- Ø 15 mm 10.00 m' 45,040.00 450,400.00 -
c.2. Fittings 1.00 Ls 731,240.00 731,240.00 -
c.3. Hanger & Support 1.00 Ls 365,760.00 365,760.00 -
c.4. Gate valve :
- Gate valve Ø 15mm 1.00 Bh 269,050.00 269,050.00 -
d.1. Instalasi Pipa Air Bersih area Perendaman linen infeksius
PPR PN-10
Lengkap sambungan, bracket, hanger dan acesories.
- Ø 25 mm 6.00 m' 74,500.00 447,000.00 -
- Ø 20 mm 17.00 m' 50,730.00 862,410.00 -
- Ø 15 mm 14.00 m' 45,040.00 630,560.00 -
d.2. Fittings 1.00 Ls 457,020.00 457,020.00 -
d.3. Hanger & Support 1.00 Ls 365,760.00 365,760.00 -
d.4. Gate valve :
- Gate valve Ø 25mm 1.00 Bh 461,960.00 461,960.00 -
e.1. Instalasi Pipa Air Bersih area Pencucian & Pengeringan linen infeksius
PPR PN-10
Lengkap sambungan, bracket, hanger dan acesories.
- Ø 20 mm 17.00 m' 50,730.00 862,410.00 -
- Ø 15 mm 14.00 m' 45,040.00 630,560.00 -
e.2. Fittings 1.00 Ls 457,020.00 457,020.00 -
e.3. Hanger & Support 1.00 Ls 365,760.00 365,760.00 -
e.4. Gate valve :
- Gate valve Ø 20mm 1.00 Bh 338,250.00 338,250.00 -
f.1. Instalasi Pipa Air Bersih area Pencucian & Pengeringan linen non infeksius
PPR PN-10
Lengkap sambungan, bracket, hanger dan acesories.
- Ø 20 mm 17.00 m' 50,730.00 862,410.00 -
- Ø 15 mm 14.00 m' 45,040.00 630,560.00 -
f.2. Fittings 1.00 Ls 457,020.00 457,020.00 -
f.3. Hanger & Support 1.00 Ls 365,760.00 365,760.00 -
f.4. Gate valve :
- Gate valve Ø 20mm 1.00 Bh 338,250.00 338,250.00 -

a.1. Instalasi Pipa Air Bersih Lantai 2


PPR PN-10,Lengkap sambungan, bracket, hanger dan acesories.
- Ø 40 mm 6.00 m' 139,820.00 838,920.00 -
- Ø 32 mm 14.00 m' 97,370.00 1,363,180.00 -
- Ø 25 mm 8.00 m' 74,500.00 596,000.00 -
- Ø 20 mm 40.00 m' 50,730.00 2,029,200.00 -
- Ø 15 mm 6.00 m' 45,040.00 270,240.00 -
a.2. Fittings 1.00 Ls 457,020.00 457,020.00 -
a.3. Hanger & Support 1.00 Ls 365,760.00 365,760.00 -
a.4. Gate valve :
- Gate valve Ø 32mm 2.00 Bh 688,870.00 1,377,740.00 -

Lantai 3
a.1. Instalasi Pipa Air Bersih Lantai 3
PPR PN-10,Lengkap sambungan, bracket, hanger dan acesories.
- Ø 40 mm 6.00 m' 139,820.00 838,920.00 -
- Ø 32 mm 14.00 m' 97,370.00 1,363,180.00 -
- Ø 25 mm 8.00 m' 74,500.00 596,000.00 -
- Ø 20 mm 40.00 m' 50,730.00 2,029,200.00 -
- Ø 15 mm 6.00 m' 45,040.00 270,240.00 -
a.2. Fittings 1.00 Ls 457,020.00 457,020.00 -
a.3. Hanger & Support 1.00 Ls 365,760.00 365,760.00 -
a.4. Gate valve :
- Gate valve Ø 32mm 2.00 Bh 688,870.00 1,377,740.00 -

Lantai 4
a.1. Instalasi Pipa Air Bersih dari pipa tegak
PPR PN-10,Lengkap sambungan, bracket, hanger dan acesories.
- Ø 65 mm 5.00 m' 270,170.00 1,350,850.00 -
- Ø 50 mm 18.00 m' 198,430.00 3,571,740.00 -
- Ø 32 mm 11.00 m' 97,370.00 1,071,070.00 -
a.2. Fittings 1.00 Ls 457,020.00 457,020.00 -
a.3. Hanger & Support 1.00 Ls 365,760.00 365,760.00 -
b.1. Instalasi Pipa Air Bersih area Toilet
PPR PN-10
Lengkap sambungan, bracket, hanger dan acesories.
- Ø 32 mm 14.00 m' 97,370.00 1,363,180.00 -
- Ø 25 mm 8.00 m' 74,500.00 596,000.00 -
- Ø 20 mm 40.00 m' 50,730.00 2,029,200.00 -
- Ø 15 mm 6.00 m' 45,040.00 270,240.00 -
b.2. Fittings 1.00 Ls 457,020.00 457,020.00 -
b.3. Hanger & Support 1.00 Ls 365,760.00 365,760.00 -
b.4. Gate valve :
- Gate valve Ø 32mm 2.00 Bh 688,870.00 1,377,740.00 -
c.1. Instalasi Pipa Air Bersih area Cuci Troli
PPR PN-10
Lengkap sambungan, bracket, hanger dan acesories.
- Ø 15 mm 10.00 m' 45,040.00 450,400.00 -
c.2. Fittings 1.00 Ls 183,910.00 183,910.00 -
c.3. Hanger & Support 1.00 Ls 183,910.00 183,910.00 -
c.4. Gate valve :
- Gate valve Ø 15mm 1.00 Bh 269,050.00 269,050.00 -
d.1. Instalasi Pipa Air Bersih & Air Panas area Pencucian & penyimpanan peralatan dapur
PPR PN-10
Lengkap sambungan, bracket, hanger dan acesories.
- Ø 25 mm 10.00 m' 74,500.00 745,000.00 -
PPR PN-20
Lengkap sambungan, bracket, hanger dan acesories.
- Ø 15 mm 8.00 m' 65,020.00 520,160.00 -
d.2. Fittings 1.00 Ls 365,760.00 365,760.00 -
d.3. Hanger & Support 1.00 Ls 274,640.00 274,640.00 -
d.4. Gate valve :
- Gate valve Ø 25mm 1.00 Bh 463,010.00 463,010.00 -
d.5. Water Heater 1.00 Bh 162,832,130.00 162,832,130.00 -
e.1. Instalasi Pipa Air Bersih & Air Panas area Persiapan Bahan Makanan
PPR PN-10
Lengkap sambungan, bracket, hanger dan acesories.
- Ø 25 mm 10.00 m' 74,500.00 745,000.00 -
PPR PN-20
Lengkap sambungan, bracket, hanger dan acesories.
- Ø 15 mm 8.00 m' 65,020.00 520,160.00 -
e.2. Fittings 1.00 Ls 365,760.00 365,760.00 -
e.3. Hanger & Support 1.00 Ls 274,640.00 274,640.00 -
e.4. Gate valve :
- Gate valve Ø 25mm 1.00 Bh 463,010.00 463,010.00 -
e.5. Water Heater Listrik Kap. 15 liter c/w Intsalasi Listrik 1.00 Bh 3,437,950.00 3,437,950.00 -
f.1. Instalasi Pipa Air Bersih & Air Panas area Pengolahan, Pemasakan & Penghangatan Makanan
PPR PN-10
Lengkap sambungan, bracket, hanger dan acesories.
- Ø 25 mm 10.00 m' 74,500.00 745,000.00 -
- Ø 20 mm 12.00 m' 50,730.00 608,760.00 -
- Ø 15 mm 10.00 m' 45,040.00 450,400.00 -
f.2. Fittings 1.00 Ls 457,020.00 457,020.00 -
f.3. Hanger & Support 1.00 Ls 183,910.00 183,910.00 -
f.4. Gate valve :
- Gate valve Ø 25mm 1.00 Bh 463,010.00 463,010.00 -

Lantai Atap
a.1. Instalasi Pipa Air Bersih dari pipa tegak transfer
PPR PN-10
Lengkap sambungan, bracket, hanger dan acesories.
- Ø 65 mm 26.00 m' 270,170.00 7,024,420.00 -
a.2. Fittings 1.00 Ls 723,770.00 723,770.00 -
a.3. Hanger & Support 1.00 Ls 274,640.00 274,640.00 -
a.4. Valve :
- Gate Valve Ø 65mm 2.00 Bh 3,094,750.00 6,189,500.00 -
- Floating Valve Ø 65mm 2.00 Bh 3,308,370.00 6,616,740.00 -

Instalasi Booster pump 1.00 Set 34,828,800.00 34,828,800.00 Ebarra/Shanghai Kaiquan atau setara
Packege Booster Pump
Kap. : 2x175 L/M
type
Total Head : 15 m'
1PH/220V/50Hz/2 x 1.1 KW
pump qty : 2 unit
Auto Paralel dan Alternate Running
C\W Variable Speed Drive & Constant Pressure Controller
Variable flow variable frequency controller / hydrovar
inverter / flow controller terpasang pada tiap tiap motor pompa
lengkap dengan pemipaan suction dan discharge
GIP - Class Medium Standard SNI-0039.87 / BS-1387-67
hydraulic accumulator tank min. 150 liter
ball valve, safety valve, Water level control dan asesories
Gate valve, Strainer, Check Valve,Flexible Joint,Pressure Gauge,
Flow Switch,Pressure Switch

Tangki Panel FRP 2.00 Set 12,703,920.00 25,407,840.00 -


Kap. 2 m3 Net,
lengkap dengan header, pemipaan overflow, vent, drain, valve dll
pondasi / dudukan beton dan support
Instalasi Pipa Air Bersih Drain & Overflow
a. PPR PN-10
Lengkap sambungan, bracket, hanger dan acesories.
- Ø 80 mm 6.00 m' 365,070.00 2,190,420.00 -
b. Fittings 1.00 Ls 365,760.00 365,760.00 -
c. Hanger & Support 1.00 Ls 183,090.00 183,090.00 -
d. valve :
- Gate valve Ø 80mm 2.00 Bh 3,841,330.00 7,682,660.00 -

Instalasi Pipa Air Bersih Distribusi Horizontal Gravitasi


a. PPR PN-10
Lengkap sambungan, bracket, hanger dan acesories.
- Header Ø 100 mm 4.00 m' 889,230.00 3,556,920.00 -
- Ø 50 mm 12.00 m' 200,520.00 2,406,240.00 -
b. Fittings 1.00 Ls 457,200.00 457,200.00 -
c. Hanger & Support 1.00 Ls 183,090.00 183,090.00 -
d. valve :
- Gate valve Ø 80mm 2.00 Bh 3,841,330.00 7,682,660.00 -

Instalasi Pipa Air Bersih Distribusi Horizontal Booster


a. PPR PN-10
Lengkap sambungan, bracket, hanger dan acesories.
- Header Ø 65 mm 2.00 m' 456,520.00 913,040.00 -
- Ø 65 mm 12.00 m' 270,170.00 3,242,040.00 -
b. Fittings 1.00 Ls 365,760.00 365,760.00 -
c. Hanger & Support 1.00 Ls 183,090.00 183,090.00 -
d. valve :
- Gate valve Ø 65mm 1.00 Bh 3,094,750.00 3,094,750.00 -
- Gate valve Ø 50mm 4.00 Bh 1,327,880.00 5,311,520.00 -
- Check valve Ø 50mm 2.00 Bh 783,970.00 1,567,940.00 -
- Strainer Ø 50mm 2.00 Bh 1,298,450.00 2,596,900.00 -
- Flexible Joint Ø 50 mm 4.00 Bh 737,930.00 2,951,720.00 -

Instalasi Pipa Tegak Air Bersih


a. Pipa Tegak Air Bersih ke Roof Tank
Shaft Utama
PPR PN-10
Lengkap sambungan, bracket, hanger dan acesories
- Ø 65 mm 24.00 m' 270,170.00 6,484,080.00 -

b. Pipa Tegak Gravitasi


Shaft Utama
PPR PN-10
Lengkap sambungan, bracket, hanger dan acesories
- Ø 50 mm 22.00 m' 200,520.00 4,411,440.00 -

c. Pipa Tegak Air Bersih Booster


Shaft Utama
PPR PN-10
Lengkap sambungan, bracket, hanger dan acesories
- Ø 65 mm 6.00 m' 270,170.00 1,621,020.00 -
- Ø 50 mm 6.00 m' 200,520.00 1,203,120.00 -
- Ø 40 mm 6.00 m' 141,620.00 849,720.00 -

Instalasi Air Kotor dan Vent


Site Plan
a. Instalasi Pipa Air Kotor
Pipa PVC, Class AW Standard JIS K 6741/2, 10 Kg/cm2
Lengkap sambungan glued joint, welded steel bracket, hanger, clamp dan accessories
- Ø 150 mm 68.00 m' 335,200.00 22,793,600.00 -
- Ø 80 mm 10.00 m' 132,500.00 1,325,000.00 -
- galian dan urugan, pipe fitting, clean out, hanger, support, clamp & asesoris (include)

b. Instalasi Pipa Air Lemak


Pipa PPR khusus air lemak, rentang PH 2~12, Std EN 1451-1 & EN 13501-1 atau DIN 4102 B2, density 2 gr/cm3, Temp. 90 derajat Celcius
Lengkap sambungan ring rubber joint, welded steel bracket, hanger, clamp dan accessories
- Ø 150 mm 68.00 m' 335,200.00 22,793,600.00 -
- galian dan urugan, pipe fitting, clean out, hanger, support, clamp & asesoris (include)

a. Instalasi Pipa Air Limbah Laundry


Pipa PVC, Class AW Standard JIS K 6741/2, 10 Kg/cm2
Lengkap sambungan glued joint, welded steel bracket, hanger, clamp dan accessories
- Ø 100 mm 68.00 m' 180,320.00 12,261,760.00 -
- galian dan urugan, pipe fitting, clean out, hanger, support, clamp & asesoris (include)

c. Instalasi Pipa Air Hujan


Pipa PVC, Class AW Standard JIS K 6741/2, 10 Kg/cm2
Lengkap sambungan glued joint, welded steel bracket, hanger, clamp dan accessories
- Ø 150 mm 27.00 m' 335,200.00 9,050,400.00 -
- galian dan urugan, pipe fitting, clean out, hanger, support, clamp & asesoris (include)

Lantai 1
a. Instalasi Pipa Air Kotor dari Pipa Tegak
Pipa PVC, Class AW Standard JIS K 6741/2, 10 Kg/cm2
Lengkap sambungan glued joint, welded steel bracket, hanger, clamp dan accessories
- Ø 150 mm 12.00 m' 237,860.00 2,854,320.00 -
- Ø 100 mm 18.00 m' 134,780.00 2,426,040.00 -
- Ø 80 mm 12.00 m' 97,150.00 1,165,800.00 -
- Ø 65 mm 9.00 m' 78,980.00 710,820.00 -
- Ø 50 mm 34.00 m' 61,930.00 2,105,620.00 -
- Ø 40 mm 12.00 m' 56,670.00 680,040.00 -
- pipe fitting, clean out, hanger, support, clamp & asesoris (include)
- Floor Clean Out Dia 100 mm 1.00 Bh 298,310.00 298,310.00 -
- Floor drain Dia 50 mm 3.00 Bh 280,890.00 842,670.00 -
b Instalasi Pipa vent dari Pipa Tegak
Pipa PVC, Class D Standard JIS K 6739 5 kg/cm2
Lengkap sambungan glued joint, welded steel bracket, hanger, clamp dan accessories
- Ø 50 mm 16.00 m' 61,930.00 990,880.00 -
- Ø 40 mm 12.00 m' 56,670.00 680,040.00 -
- Ø 32 mm 20.00 m' 44,070.00 881,400.00 -

c. Instalasi Pipa Air Lemak


Pipa PPR khusus air lemak, rentang PH 2~12, Std EN 1451-1 & EN 13501-1 atau DIN 4102 B2, density 2 gr/cm3, Temp. 90 derajat Celcius
Lengkap sambungan ring rubber joint, welded steel bracket, hanger, clamp dan accessories
- Ø 150 mm 12.00 m' 237,860.00 2,854,320.00 -
- pipe fitting, clean out, hanger, support, clamp & asesoris 1.00 Ls 451,940.00 451,940.00 -

d. Instalasi Pipa Air Limbah Laundry


Pipa PVC, Class AW Standard JIS K 6741/2, 10 Kg/cm2
Lengkap sambungan glued joint, welded steel bracket, hanger, clamp dan accessories
- Ø 100 mm 42.00 m' 134,780.00 5,660,760.00 -
- Ø 50 mm 24.00 m' 61,930.00 1,486,320.00 -
- galian dan urugan, pipe fitting, clean out, hanger, support, clamp & asesoris 1.00 Ls 456,980.00 456,980.00 -

Lantai 2
a. Instalasi Pipa Air Kotor dari Pipa Tegak
Pipa PVC, Class AW Standard JIS K 6741/2, 10 Kg/cm2
Lengkap sambungan glued joint, welded steel bracket, hanger, clamp dan accessories
- Ø 100 mm 24.00 m' 134,590.00 3,230,160.00 -
- Ø 80 mm 2.00 m' 97,150.00 194,300.00 -
- Ø 65 mm 12.00 m' 78,980.00 947,760.00 -
- Ø 50 mm 54.00 m' 61,930.00 3,344,220.00 -
- Ø 40 mm 24.00 m' 56,670.00 1,360,080.00 -
- pipe fitting, clean out, hanger, support, clamp & asesoris 1.00 Ls 1,355,840.00 1,355,840.00 -
- Floor Clean Out Dia 100 mm 1.00 Bh 298,310.00 298,310.00 -
- Floor drain Dia 50 mm 6.00 Bh 280,890.00 1,685,340.00 -

b Instalasi Pipa vent dari Pipa Tegak


Pipa PVC, Class D Standard JIS K 6739 5 kg/cm2
Lengkap sambungan glued joint, welded steel bracket, hanger, clamp dan accessories
- Ø 50 mm 16.00 m' 61,930.00 990,880.00 -
- Ø 40 mm 12.00 m' 56,670.00 680,040.00 -
- Ø 32 mm 20.00 m' 44,120.00 882,400.00 -
- pipe fitting, clean out, hanger, support, clamp & asesoris 1.00 Ls 540,680.00 540,680.00 -

Lantai 3
a. Instalasi Pipa Air Kotor dari Pipa Tegak
Pipa PVC, Class AW Standard JIS K 6741/2, 10 Kg/cm2
Lengkap sambungan glued joint, welded steel bracket, hanger, clamp dan accessories
- Ø 100 mm 24.00 m' 134,590.00 3,230,160.00 -
- Ø 80 mm 2.00 m' 97,150.00 194,300.00 -
- Ø 65 mm 12.00 m' 78,980.00 947,760.00 -
- Ø 50 mm 54.00 m' 61,930.00 3,344,220.00 -
- Ø 40 mm 24.00 m' 56,670.00 1,360,080.00 -
- pipe fitting, clean out, hanger, support, clamp & asesoris 1.00 Ls 1,355,840.00 1,355,840.00 -
- Floor Clean Out Dia 100 mm 1.00 Bh 298,310.00 298,310.00 -
- Floor drain Dia 50 mm 6.00 Bh 280,890.00 1,685,340.00 -

b Instalasi Pipa vent dari Pipa Tegak


Pipa PVC, Class D Standard JIS K 6739 5 kg/cm2
Lengkap sambungan glued joint, welded steel bracket, hanger, clamp dan accessories
- Ø 50 mm 16.00 m' 61,930.00 990,880.00 -
- Ø 40 mm 12.00 m' 56,670.00 680,040.00 -
- Ø 32 mm 20.00 m' 44,120.00 882,400.00 -
- pipe fitting, clean out, hanger, support, clamp & asesoris 1.00 Ls 451,940.00 451,940.00 -

Lantai 4
a. Instalasi Pipa Air Kotor dari Pipa Tegak
Pipa PVC, Class AW Standard JIS K 6741/2, 10 Kg/cm2
Lengkap sambungan glued joint, welded steel bracket, hanger, clamp dan accessories
- Ø 100 mm 24.00 m' 134,590.00 3,230,160.00 -
- Ø 80 mm 2.00 m' 97,150.00 194,300.00 -
- Ø 65 mm 12.00 m' 78,980.00 947,760.00 -
- Ø 50 mm 54.00 m' 61,930.00 3,344,220.00 -
- Ø 40 mm 24.00 m' 56,670.00 1,360,080.00 -
- pipe fitting, clean out, hanger, support, clamp & asesoris 1.00 Ls 1,355,840.00 1,355,840.00 -
- Floor Clean Out Dia 100 mm 1.00 Bh 298,310.00 298,310.00 -
- Floor drain Dia 50 mm 6.00 Bh 280,890.00 1,685,340.00 -

b Instalasi Pipa vent dari Pipa Tegak


Pipa PVC, Class D Standard JIS K 6739 5 kg/cm2
Lengkap sambungan glued joint, welded steel bracket, hanger, clamp dan accessories
- Ø 50 mm 16.00 m' 61,930.00 990,880.00 -
- Ø 40 mm 12.00 m' 56,670.00 680,040.00 -
- Ø 32 mm 20.00 m' 44,120.00 882,400.00 -
- pipe fitting, clean out, hanger, support, clamp & asesoris 1.00 Ls 272,750.00 272,750.00 -

c. Instalasi Pipa Air Lemak


Pipa PPR khusus air lemak, rentang PH 2~12, Std EN 1451-1 & EN 13501-1 atau DIN 4102 B2, density 2 gr/cm3, Temp. 90 derajat Celcius
Lengkap sambungan ring rubber joint, welded steel bracket, hanger, clamp dan accessories
- Ø 100 mm 46.00 m' 323,190.00 14,866,740.00 -
- Ø 50 mm 32.00 m' 251,300.00 8,041,600.00 -
- pipe fitting, clean out, hanger, support, clamp & asesoris 1.00 Ls 1,538,020.00 1,538,020.00 -
- Floor drain Dia 50 mm 8.00 Bh 280,890.00 2,247,120.00 -

d. Instalasi Pipa Air Limbah Laundry


Pipa PVC, Class AW Standard JIS K 6741/2, 10 Kg/cm2
Lengkap sambungan glued joint, welded steel bracket, hanger, clamp dan accessories
- Ø 50 mm 8.00 m' 61,930.00 495,440.00 -
- galian dan urugan, pipe fitting, clean out, hanger, support, clamp & asesoris 1.00 Ls 273,940.00 273,940.00 -
- Floor drain Dia 50 mm 1.00 Bh 280,890.00 280,890.00 -

Lantai Atap
a. Instalasi Pipa Air Hujan
Pipa PVC, Class AW Standard JIS K 6741/2, 10 Kg/cm2
Lengkap sambungan glued joint, welded steel bracket, hanger, clamp dan accessories
- Ø 80 mm 60.00 m' 61,930.00 3,715,800.00 -
- pipe fitting, clean out, hanger, support, clamp & asesoris 1.00 Ls 451,940.00 451,940.00 -
- Shifonic Roof drain Ø 100 mm 14.00 Bh 409,540.00 5,733,560.00 -
Pipa Tegak
a. Instalasi Pipa Tegak Air Kotor di Shaft Utama
Pipa PVC, Class AW Standard JIS K 6741/2, 10 Kg/cm2
Lengkap sambungan glued joint, welded steel bracket, hanger, clamp dan accessories
- Ø 150 mm 8.00 m' 237,860.00 1,902,880.00 -
- Ø 100 mm 8.00 m' 134,590.00 1,076,720.00 -
- Ø 80 mm 16.00 m' 97,150.00 1,554,400.00 -

b. Instalasi Pipa Tegak vent di Shaft Utama


Pipa PVC, Class D Standard JIS K 6739 5 kg/cm2
Lengkap sambungan glued joint, welded steel bracket, hanger, clamp dan accessories
- Ø 65 mm 16.00 m' 78,980.00 1,263,680.00 -
- pipe fitting, clean out, hanger, support, clamp & asesoris 1.00 Ls 272,750.00 272,750.00 -
- Vent cap dia. 65 mm 1.00 Bh 183,000.00 183,000.00 -

c. Instalasi Pipa Tegak Air Lemak di Shaft Utama


Pipa PPR khusus air lemak, rentang PH 2~12, Std EN 1451-1 & EN 13501-1 atau DIN 4102 B2, density 2 gr/cm3, Temp. 90 derajat Celcius
Lengkap sambungan ring rubber joint, welded steel bracket, hanger, clamp dan accessories
- Ø 150 mm 16.00 m' 411,470.00 6,583,520.00 -
- pipe fitting, clean out, hanger, support, clamp & asesoris 1.00 Ls 1,359,000.00 1,359,000.00 -

d. Instalasi Pipa Air Limbah Laundry di Shaft Utama


Pipa PVC, Class AW Standard JIS K 6741/2, 10 Kg/cm2
Lengkap sambungan glued joint, welded steel bracket, hanger, clamp dan accessories
- Ø 50 mm 16.00 m' 61,930.00 990,880.00 -
- galian dan urugan, pipe fitting, clean out, hanger, support, clamp & asesoris 1.00 Ls 456,980.00 456,980.00 -

e. Instalasi Pipa Tegak Air Hujan


Pipa PVC, Class AW Standard JIS K 6741/2, 10 Kg/cm2
Lengkap sambungan glued joint, welded steel bracket, hanger, clamp dan accessories
- Ø 80 mm 140.00 m' 97,150.00 13,601,000.00 -
- pipe fitting, clean out, hanger, support, clamp & asesoris 1.00 Ls 543,770.00 543,770.00 -
JUMLAH PEKERJAAN PLUMBING

2 PEKERJAAN PEMADAM KEBAKARAN


Pengadaan dan Pemasangan
Instalasi Pemadam
Kebakaran, Equipmeny

Pekerjaan Hydrant
Site Plan
a. Pipa Distribusi Hydrant Pipa Black Steel, Class Sch. 40 Standard ASTM A 53, dll
- Ø 150 mm 69.00 m' 1,078,020.00 74,383,380.00 -
- Ø 100 mm 26.00 m' 636,120.00 16,539,120.00 -
- pipe fitting, cut & fill, support, clamp & asesoris 1.00 Ls 18,314,750.00 18,314,750.00 -
b. OHB - Outdoor Hydrant Box Standard NFPA International, dll Lengkap, Accessories : Box House uk. 750x180x1250
1.00 mm
Unit
/1 unit Pondasi Beton
4,774,710.00
c/w OHB 4,774,710.00 -
c. HP - Hydrant Pilar, Standard NFPA International, dll Lengkap, Accessories : 'Size 4' x 2 1/2' x 2 1/2' 1.00 Unit 9,287,580.00 9,287,580.00 Hooseki atau setara
d. Bak Kontrol Beton 800x500 1.00 Bh 457,100.00 457,100.00 -
e. Gate Valve Ø 100 mm 1.00 Bh 5,404,900.00 5,404,900.00 -
f. SC - Siemese Connection Standard NFPA International, dll Lengkap, Accessories :Size 4' x 2 1/2' x 2 1/2' 1.00 Unit 8,413,620.00 8,413,620.00 Hooseki atau setara
g. Check valve Ø 100 mm Cast iron, 300 Lbs, JIS 20 K 1.00 Bh 5,232,740.00 5,232,740.00 -
Lantai 1
a. Pipa Distribusi Hydrant Pipa Black Steel, Class Sch. 40 Standard ASTM A 53, dll
- Ø 80 mm 12.00 m' 371,720.00 4,460,640.00 -
- Ø 65 mm 6.00 m' 289,420.00 1,736,520.00 -
- pipe fitting, hanger, support, clamp & asesoris 1.00 Ls 456,980.00 456,980.00 -
b. Valve dan Accessories Type Flange end, Cast Iron, Clas 300 Lbs, JIS 20 K Standard ANSI/MSS, ATSM A 120, dll
- Landing Valve 1.00 Bh 3,857,930.00 3,857,930.00 Hooseki atau setara
c. IHB - Indoor Hydrant Box Standard NFPA International, dll Lengkap, Accessories : 1.00 Unit 4,216,450.00 4,216,450.00 Hooseki atau setara
Box House uk. 750x180x1250 mm - 1 unit
Angle Valve 1 1/2 inch - 1 bh
Hose Rack - 1 bh
Nozzle - 1 bh
Alarm Bell - 1 bh
Push Button - 1 bh
Indicator Lamp - 1 bh
d. Fire Extinguisher, Standard NFPA International, dll
Lengkap Accessories
- Type : Dry Chemical Klas A,B,C 3.00 Bh 4,276,990.00 12,830,970.00 Hooseki atau setara
Capasitas : 6 Kg

Lantai 2
a. Pipa Distribusi Hydrant Pipa Black Steel, Class Sch. 40 Standard ASTM A 53, dll
- Ø 80 mm 12.00 m' 371,720.00 4,460,640.00 -
- Ø 65 mm 6.00 m' 289,420.00 1,736,520.00 -
- pipe fitting, hanger, support, clamp & asesoris 1.00 Ls 1,231,220.00 1,231,220.00 -
b. Valve dan Accessories Type Flange end, Cast Iron, Clas 300 Lbs, JIS 20 K Standard ANSI/MSS,
- Landing Valve 1.00 Bh 3,857,930.00 3,857,930.00 -
c. IHB - Indoor Hydrant Box Standard NFPA International, dll Lengkap, Accessories : 1.00 Unit 4,216,450.00 4,216,450.00 Hooseki atau setara
Box House uk. 750x180x1250 mm - 1 unit
Angle Valve 1 1/2 inch - 1 bh
Hose Rack - 1 bh
Nozzle - 1 bh
Alarm Bell - 1 bh
Push Button - 1 bh
Indicator Lamp - 1 bh
d. Fire Extinguisher, Standard NFPA International, dll
Lengkap Accessories
- Type : Dry Chemical Klas A,B,C 3.00 Bh 4,225,050.00 12,675,150.00 Hooseki atau setara
Capasitas : 6 Kg
Lantai 3
a. Pipa Distribusi Hydrant Pipa Black Steel, Class Sch. 40 Standard ASTM A 53, dll
- Ø 80 mm 12.00 m' 371,720.00 4,460,640.00 -
- Ø 65 mm 6.00 m' 289,420.00 1,736,520.00 -
- pipe fitting, hanger, support, clamp & asesoris 1.00 Ls 456,980.00 456,980.00 -
b. Valve dan Accessories Type Flange end, Cast Iron, Clas 300 Lbs, JIS 20 K Standard ANSI/MSS,
- Landing Valve 1.00 Bh 3,857,930.00 3,857,930.00 -
c. IHB - Indoor Hydrant Box Standard NFPA International, dll Lengkap, Accessories : 1.00 Unit 4,216,450.00 4,216,450.00 Hooseki atau setara
Box House uk. 750x180x1250 mm - 1 unit
Angle Valve 1 1/2 inch - 1 bh
Hose Rack - 1 bh
Nozzle - 1 bh
Alarm Bell - 1 bh
Push Button - 1 bh
Indicator Lamp - 1 bh
d. Fire Extinguisher, Standard NFPA International, dll
Lengkap Accessories
- Type : Dry Chemical Klas A,B,C 3.00 Bh 4,225,050.00 12,675,150.00 Hooseki atau setara
Capasitas : 6 Kg

Lantai 4
a. Pipa Distribusi Hydrant Pipa Black Steel, Class Sch. 40 Standard ASTM A 53, dll
- Ø 80 mm 12.00 m' 371,720.00 4,460,640.00 -
- Ø 65 mm 6.00 m' 289,420.00 1,736,520.00 -
- pipe fitting, hanger, support, clamp & asesoris 1.00 Ls 1,231,220.00 1,231,220.00 -
b. Valve dan Accessories Type Flange end, Cast Iron, Clas 300 Lbs, JIS 20 K Standard ANSI/MSS,
- Landing Valve 1.00 Bh 3,857,930.00 3,857,930.00 -
c. IHB - Indoor Hydrant Box Standard NFPA International, dll Lengkap, Accessories : 1.00 Unit 4,216,450.00 4,216,450.00 Hooseki atau setara
Box House uk. 750x180x1250 mm - 1 unit
Angle Valve 1 1/2 inch - 1 bh
Hose Rack - 1 bh
Nozzle - 1 bh
Alarm Bell - 1 bh
Push Button - 1 bh
Indicator Lamp - 1 bh
d. Fire Extinguisher, Standard NFPA International, dll
Lengkap Accessories
- Type : Dry Chemical Klas A,B,C 3.00 Bh 1,183,460.00 3,550,380.00 -
Capasitas : 6 Kg
- Type : Type-K 8.00 Bh 3,269,560.00 26,156,480.00 -
Capasitas : 6 Kg

Lantai Atap
a. Pipa Distribusi Hydrant Pipa Black Steel, Class Sch. 40 Standard ASTM A 53, dll
- Ø 65 mm 6.00 m' 289,420.00 1,736,520.00 -
- pipe fitting, hanger, support, clamp & asesoris 1.00 Ls 347,310.00 347,310.00 -
b. Valve dan Accessories Type Flange end, Cast Iron, Clas 300 Lbs, JIS 20 K Standard ANSI/MSS,
- Landing Valve 1.00 Bh 3,857,930.00 3,857,930.00 -
d. Fire Extinguisher, Standard NFPA International, dll
Lengkap Accessories
- Type : Dry Chemical Klas A,B,C 1.00 Bh 4,225,050.00 4,225,050.00 Hooseki atau setara
Capasitas : 6 Kg

Pipa Tegak Hydrant


a. Pipa Tegak Hydrant Pipa Black Steel, Class Sch. 40 Standard ASTM A 53, dll
- Ø 100 mm 22.00 m' 512,260.00 11,269,720.00 -
- pipe fitting, hanger, support, clamp & asesoris 1.00 Ls 2,214,140.00 2,214,140.00 -
b. Valve dan Accessories Type Flange end, Cast Iron, Clas 300 Lbs, JIS 20 K Standard ANSI/MSS,
- Gate valve Ø 25 mm 1.00 Bh 460,030.00 460,030.00 -
- Automatic air vent Ø 25 mm 1.00 Bh 4,738,700.00 4,738,700.00 -
- Pressure Gauge 1.00 Bh 1,002,800.00 1,002,800.00 -

Pekerjaan Sprinkler
Site Plan
a. Pipa
- BSP Ø 100 mm 60.00 m' 512,260.00 30,735,600.00 -
- pipe fitting, hanger, support, clamp & asesoris 1.00 Ls 5,985,190.00 5,985,190.00 -
Lantai1
a. Pipa
- BSP Ø 80 mm 18.00 m' 371,720.00 6,690,960.00 -
- BSP Ø 65 mm 9.00 m' 289,420.00 2,604,780.00 -
- BSP Ø 50 mm 4.00 m' 182,970.00 731,880.00 -
- BSP Ø 40 mm 9.00 m' 143,030.00 1,287,270.00 -
- BSP Ø 32 mm 8.00 m' 122,670.00 981,360.00 -
- BSP Ø 25 mm 24.00 m' 96,500.00 2,316,000.00 -
- pipe fitting, hanger, support, clamp & asesoris 1.00 Ls 2,870,930.00 2,870,930.00 -
b. Valve dan Accessories Type Flange end, Cast Iron, Clas 300 Lbs, JIS 20 K Standard ANSI/MSS,
- Gate valve Ø 80 mm 1.00 Bh 3,806,980.00 3,806,980.00 -
- Test & Drain Valve Ø 25 mm 1.00 Bh 460,030.00 460,030.00 -
- Flow switch 1.00 Bh 1,539,120.00 1,539,120.00 -
- Pressure Gauge 1.00 Bh 1,006,170.00 1,006,170.00 -
- Head Sprinkler type Pendent 24.00 Bh 121,210.00 2,909,040.00 -

Lantai 2
a. Pipa Distribusi Springkler & Drain, Pipa Black Steel, Class Sch. 40 Standard ASTM A 53, dll
- BSP Ø 80 mm 22.00 m' 371,720.00 8,177,840.00 -
- BSP Ø 65 mm 10.00 m' 289,420.00 2,894,200.00 -
- BSP Ø 50 mm 6.00 m' 182,970.00 1,097,820.00 -
- BSP Ø 40 mm 9.00 m' 143,030.00 1,287,270.00 -
- BSP Ø 32 mm 8.00 m' 122,670.00 981,360.00 -
- BSP Ø 25 mm 27.00 m' 96,500.00 2,605,500.00 -
- pipe fitting, hanger, support, clamp & asesoris 1.00 Ls 3,367,980.00 3,367,980.00 -
b. Valve dan Accessories Type Flange end, Cast Iron, Clas 300 Lbs, JIS 20 K Standard ANSI/MSS,
- Gate valve Ø 80 mm 1.00 Bh 3,806,980.00 3,806,980.00 -
- Test & Drain Valve Ø 25 mm 1.00 Bh 460,030.00 460,030.00 -
- Flow switch 1.00 Bh 1,539,120.00 1,539,120.00 -
- Pressure Gauge 1.00 Bh 1,006,170.00 1,006,170.00 -
- Head Sprinkler type Pendent 27.00 Bh 121,210.00 3,272,670.00 -

Lantai 3
a. Pipa Distribusi Springkler & Drain, Pipa Black Steel, Class Sch. 40 Standard ASTM A 53, dll
- BSP Ø 80 mm 22.00 m' 371,720.00 8,177,840.00 -
- BSP Ø 65 mm 10.00 m' 289,420.00 2,894,200.00 -
- BSP Ø 50 mm 6.00 m' 182,970.00 1,097,820.00 -
- BSP Ø 40 mm 9.00 m' 143,030.00 1,287,270.00 -
- BSP Ø 32 mm 8.00 m' 122,670.00 981,360.00 -
- BSP Ø 25 mm 27.00 m' 96,500.00 2,605,500.00 -
- pipe fitting, hanger, support, clamp & asesoris 1.00 Ls 3,367,980.00 3,367,980.00 -
b. Valve dan Accessories Type Flange end, Cast Iron, Clas 300 Lbs, JIS 20 K Standard ANSI/MSS,
- Gate valve Ø 80 mm 1.00 Bh 3,806,980.00 3,806,980.00 -
- Test & Drain Valve Ø 25 mm 1.00 Bh 460,030.00 460,030.00 -
- Flow switch 1.00 Bh 1,539,120.00 1,539,120.00 -
- Pressure Gauge 1.00 Bh 1,006,170.00 1,006,170.00 -
- Head Sprinkler type Pendent 27.00 Bh 121,210.00 3,272,670.00 -

Lantai 4
a. Pipa Distribusi Springkler & Drain, Pipa Black Steel, Class Sch. 40 Standard ASTM A 53, dll
- BSP Ø 80 mm 22.00 m' 371,720.00 8,177,840.00 -
- BSP Ø 65 mm 10.00 m' 289,420.00 2,894,200.00 -
- BSP Ø 50 mm 6.00 m' 182,970.00 1,097,820.00 -
- BSP Ø 40 mm 9.00 m' 143,030.00 1,287,270.00 -
- BSP Ø 32 mm 8.00 m' 122,670.00 981,360.00 -
- BSP Ø 25 mm 24.00 m' 96,500.00 2,316,000.00 -
- pipe fitting, hanger, support, clamp & asesoris 1.00 Ls 1,448,580.00 1,448,580.00 -
b. Valve dan Accessories Type Flange end, Cast Iron, Clas 300 Lbs, JIS 20 K Standard ANSI/MSS,
- Gate valve Ø 80 mm 1.00 Bh 3,806,980.00 3,806,980.00 -
- Test & Drain Valve Ø 25 mm 1.00 Bh 460,030.00 460,030.00 -
- Flow switch 1.00 Bh 1,539,120.00 1,539,120.00 -
- Pressure Gauge 1.00 Bh 1,006,170.00 1,006,170.00 -
- Head Sprinkler type Pendent 24.00 Bh 121,210.00 2,909,040.00 -

Pipa Tegak
a. Pipa Distribusi Springkler & Drain, Pipa Black Steel, Class Sch. 40 Standard ASTM A 53, dll
- BSP Ø 100 mm 22.00 m' 512,260.00 11,269,720.00 -
- BSP Ø 50 mm 22.00 m' 183,280.00 4,032,160.00 -
- pipe fitting, hanger, support, clamp & asesoris 1.00 Ls 3,007,550.00 3,007,550.00 -
b. Valve dan Accessories Type Flange end, Cast Iron, Clas 300 Lbs, JIS 20 K Standard ANSI/MSS,
- Gate valve Ø 25 mm 1.00 Bh 460,030.00 460,030.00 -
- Automatic Air Vent Ø 25 mm 1.00 Bh 4,676,390.00 4,676,390.00 -
- Pressure Gauge 1.00 Bh 1,001,850.00 1,001,850.00 -

Peralatan Utama
Pemipaan Pompa Hydrant dan Springkler
a. Pipa Distribusi Springkler & Drain, Pipa Black Steel, Class Sch. 40 Standard ASTM A 53, dll
- BSP Ø 150 mm 24.00 m' 856,340.00 20,552,160.00 -
- BSP Ø 65 mm 8.00 m' 289,420.00 2,315,360.00 -
- BSP Ø 50 mm 8.00 m' 183,280.00 1,466,240.00 -
- pipe fitting, hanger, support, clamp & asesoris 1.00 Ls 4,823,290.00 4,823,290.00 -
Peralatan
ELECTRIC FIRE
a. Electric Hydrant Pump 1.00 Unit 235,031,670.00 235,031,670.00 Ebarra/Shanghai Kuiqian atau setara
- Type : end suction centrifugal
- Cap : 750 gpm : 9,5 bar
- Power : 90 kw
- operasi : Automatic on-off
- lengkap dengan asesories, Electric Fire Pump Controller
b. Diesel Hydrant Pump 1.00 Unit 740,758,480.00 740,758,480.00 Ebarra/Shanghai Kuiqian atau setara
- Type : end suction centrifugal
- Cap : 750 gpm : 9,5 bar
- Power : 125 HP
- operasi : Automatic on-off
- lengkap dengan asesories, tangki BBM dan Diesel Fire Pump Controller
c. Jockey Hydrant Pump 1.00 Unit 82,637,110.00 82,637,110.00 Ebarra/Shanghai Kuiqian atau setara
- Type : Vertical multy stage
- Cap : 25 gpm : 100 bar
- Power : 5 kw
- operasi : Automatic on-off
- lengkap dengan asesories, tangki BBM dan Electric Jockey Pump Controller
d. Valve dan Accessories Type Flange end, Cast Iron, Clas 300 Lbs, JIS 20 K Standard ANSI/MSS,
- Header dia. 200 4.00 m' 1,756,700.00 7,026,800.00 -
- Gate valve Ø 150 mm 3.00 Bh 10,026,710.00 30,080,130.00 -
- Gate valve Ø 65 mm 1.00 Bh 3,103,280.00 3,103,280.00 -
- Gate valve Ø 50 mm 1.00 Bh 2,706,260.00 2,706,260.00 -
- Butterfy valve Ø 150 mm 4.00 Bh 17,716,420.00 70,865,680.00 -
- Main Relief valve Ø 150 mm 1.00 Bh 20,739,170.00 20,739,170.00 -
- Ball Drip valve Ø 150 mm 1.00 Bh 28,498,990.00 28,498,990.00 -
- Hose valve Ø 150 mm 1.00 Bh 29,789,110.00 29,789,110.00 -
- Strainer Ø 150 mm 2.00 Bh 7,109,600.00 14,219,200.00 -
- Strainer Ø 65 mm 1.00 Bh 2,186,030.00 2,186,030.00 -
- Flexible Joint Ø 150 mm 4.00 Bh 2,096,650.00 8,386,600.00 -
- Flexible Joint Ø 65 mm 1.00 Bh 817,360.00 817,360.00 -
- Flexible Joint Ø 50 mm 1.00 Bh 738,670.00 738,670.00 -
- Check Valve Ø 150 mm 2.00 Bh 10,604,390.00 21,208,780.00 -
- Check Valve Ø 50 mm 1.00 Bh 2,449,750.00 2,449,750.00 -
- Pressure gauge 6.00 Bh 329,700.00 1,978,200.00 -
- Flow Meter 1.00 Bh 2,102,050.00 2,102,050.00 -
- Alarm Check valve Ø 150 mm C/w alrm gong and ascesories 1.00 set 2,895,080.00 2,895,080.00 -
- OS&Y Ø 150 mm 1.00 Bh 8,129,000.00 8,129,000.00 -
- Test valve Ø150 mm 1.00 Bh 10,136,080.00 10,136,080.00 -
- PRV set 1.00 Bh 11,755,560.00 11,755,560.00 -
- Pressure Tank --- liter, work press. -- bar c/w pressure gauge, &safety valve 1.00 set 15,044,440.00 15,044,440.00 -
- Accessories (Support, Clamp, Mur baut, dll) 1.00 Ls 2,273,590.00 2,273,590.00 -
- pipe fitting (groove victaulic), hanger, support, clamp & asesoris 1.00 Ls 13,458,010.00 13,458,010.00 -
Perijinan, Trainning, Testing dan Commissioning termasuk penyediaan air, mendatangkan Petugas Pemadam Kebakaran, dll 1.00 Ls 4,577,600.00 4,577,600.00 -

JUMLAH PEKERJAAN PEMADAM KEBAKARAN

3 PEKERJAAN GAS LPG


Pengadaan dan Pemasangan
Equipment gas
Instalasi Pemipaan Gas LPG
Lantai 3
a1. Pemipaan Gas LPG
- Pipa Tembaga type L, ASTM - B 88, WP 40 Bar
- Ø 25 mm 42.00 m' 320,410.00 13,457,220.00 -
- Ø 20 mm 40.00 m' 256,580.00 10,263,200.00 -
a2. pipe fitting, hanger, support, clamp & asesoris 1.00 Ls 4,689,670.00 4,689,670.00 -
- valve :
- Ball valve Ø20 mm 10.00 m' 320,650.00 3,206,500.00 -
- Ball valve Ø15 mm 10.00 m' 231,340.00 2,313,400.00 -
- Pressure gauge 10.00 m' 327,090.00 3,270,900.00 -
Alarm Lengkap Panel dan Instalasi 1.00 unit 5,885,510.00 5,885,510.00 -
Pipa Tegak Gas LPG
a. Pipa Tegak LPG
a1. Pipa Tembaga type L, ASTM - B 88, WP 40 Bar
- Ø 25 mm 12.00 m' 320,410.00 3,844,920.00 -

Peralatan Utama Gas LPG


a. - LPG Bottle 50kg
- LPG Bottle 50kg (terpasang) 6.00 bh 3,153,930.00 18,923,580.00 -
- LPG Bottle 50kg (cadangan) 10.00 bh 3,153,930.00 31,539,300.00 -
b. - Flexible hose gas Ø9 mm 6.00 bh 335,560.00 2,013,360.00 -
c. - Ball valve Ø25 mm 2.00 bh 320,580.00 641,160.00 -
d. - Ball valve Ø15 mm 6.00 bh 231,370.00 1,388,220.00 -
e. - LPG Regulator 1.00 bh 3,830,940.00 3,830,940.00 -
f. - Pressure gauge 3.00 bh 327,090.00 981,270.00 -
g. - Pipe support 1.00 Ls 3,157,160.00 3,157,160.00 -
JUMLAH PEKERJAAN GAS LPG

4 PEKERJAAN ELEVATOR & ESCALATOR


Pengadaan & Pemasangan
Lift Penumpang/Barang dan
Lift
a. Equipment
Kapasitas : 1350 Kg 1.00 unit 557,138,650.00 557,138,650.00 PILLAR/GMV
Jml. Lantai : 4/4
Include list :
Service : Passenger Elevator
Volume : 2 unit
Speed : 60 mpm
Control : AC-Variable Voltage Variable
Frequency (ACVVVF)
Operation : duplex
Opening door : 2 opening
Door type : Two panel side opening autom. Door SO
Product : Pillar
Acest :
- Separator Beam, ARD, Ladder, Receptackle, Housting Hook,
Waterprofing Finish, etc.

b Dumb Waiter
Kap 200 Kg, Floor Type 1.00 unit 307,584,360.00 307,584,360.00 PILLAR/GMV
Product : Pillar
b. Erection Instalasi & Programing 2.00 unit 31,960,400.00 63,920,800.00 -
(Incld. Sertifikat Depnaker, dll)
TOTAL PEKERJAAN ELEVATOR DAN ESCALATOR

5 PEKERJAAN AC DAN VENTILASI MEKANIK


Pengadaan dan Pemasangan Equipment MRV Sistem, Split Duct, Single Split Type Wall Mounted, Celling concealed,

3 Lantai 1 (Satu)
3.1 Pekerjaan AC VRF System
Indoor Unit c/w Accessories
• IU.A-01 Unit 1.00 10,951,750.00 10,951,750.00 DAIKIN
Model :
Type : Ceiling Mounted
Kapasitas : 19100 Btu/H

• hanger, support dan asesoris Lot 1.00 236,750.00 236,750.00 -


• Kabel Power & Control
- Kabel Power dari PP-AC (ukuran disesuaikan dengan kap. AC) Lot 1.00 481,300.00 481,300.00 -
- Kabel Control Lot 1.00 392,430.00 392,430.00 -
• Pipa Refregerant c/w isolasi armaflex t = 19 mm, vinil, klem Lot 1.00 5,598,080.00 5,598,080.00 INSUFLEX atau setara
• Pipa Drainage PVC AW c/w isolasi armaflex t = 13mm, klem Lot 1.00 2,553,510.00 2,553,510.00 KEMBLA atau setara

3..2 Pekerjaan Exhaust


• Exhaust air fan
Type : Ceiling Fan Unit 3.00 409,650.00 1,228,950.00 -
Service : Toilet
Air Flow : 100 cfm
Ext. Static Press : 0.2 in/wg
Power : 10 W/ 220V/ 1Phs/ 50Hz
Instalasi exhaust air duct tanpa isolasi
- dia. 150 m 4.00 118,800.00 475,200.00 -
- dia. 100 m 9.00 100,610.00 905,490.00 -
- louvre : 200 x 200 Bh 1.00 310,850.00 310,850.00 -

• Exhaust air fan


Type : Wall fan Unit 1.00 405,920.00 405,920.00 -
Service : Cuci Troli
Air Flow : 125 cfm
Ext. Static Press : 0.2 in/wg
Power : 10 W/ 220V/ 1Phs/ 50Hz

• Exhaust air fan


Type : Wall fan Unit 1.00 594,000.00 594,000.00 -
Service : Gudang bahan kimia
Air Flow : 80 cfm
Ext. Static Press : 0.2 in/wg
Power : 10 W/ 220V/ 1Phs/ 50Hz

• Exhaust air fan


Type : Axial Unit 1.00 3,156,800.00 3,156,800.00 -
Service : Perendaman Linen Infeksius
Air Flow : 350 cfm
Ext. Static Press : 0.2 in/wg
Power : 22 W/ 220V/ 1Phs/ 50Hz
Exhaust Air Duct
- 325 x 200 m' 2.00 329,020.00 658,040.00 -
- 250 x 150 m' 8.00 309,830.00 2,478,640.00 -
Sound attenuator
- 325 x 200 m' 2.00 1,261,580.00 2,523,160.00 -
Grille
- EAG : 250 x 250 Bh 2.00 347,460.00 694,920.00 -
- louvre : 350 x 350 Bh 1.00 393,720.00 393,720.00 -

• Exhaust air fan


Type : Axial Unit 1.00 4,325,410.00 4,325,410.00 -
Service : Pencucian & Pengeringan Linen Infeksius
Air Flow : 500 cfm
Ext. Static Press : 0.2 in/wg
Power : 35 W/ 220V/ 1Phs/ 50Hz
Exhaust Air Duct
- 425 x 200 m' 3.00 391,700.00 1,175,100.00 -
- 325 x 200 m' 4.00 329,020.00 1,316,080.00 -
- 250 x 150 m' 9.00 309,830.00 2,788,470.00 -
Sound attenuator
- 425 x 200 m' 3.00 1,261,580.00 3,784,740.00 -
Grille
- EAG : 250 x 250 Bh 3.00 347,460.00 1,042,380.00 -
- louvre : 450 x 450 Bh 1.00 421,180.00 421,180.00 -
• Exhaust air fan
Type : Wall fan Unit 1.00 592,540.00 592,540.00 -
Service : Gudang Gas LPG
Air Flow : 80 cfm
Ext. Static Press : 0.2 in/wg
Power : 10 W/ 220V/ 1Phs/ 50Hz

• Exhaust air fan


Type : Axial Unit 1.00 4,325,410.00 4,325,410.00 -
Service : Perbaikan, Penyimpanan & Distribusi Linen
Air Flow : 430 cfm
Ext. Static Press : 0.2 in/wg
Power : 22 W/ 220V/ 1Phs/ 50Hz
Exhaust Air Duct
- 325 x 200 m' 2.00 329,020.00 658,040.00 -
- 250 x 150 m' 8.00 309,830.00 2,478,640.00 -
Sound attenuator
- 325 x 200 m' 2.00 1,261,580.00 2,523,160.00 -
Grille
- EAG : 250 x 250 Bh 2.00 347,460.00 694,920.00 -
- louvre : 350 x 350 Bh 1.00 421,180.00 421,180.00 -

• Exhaust air fan


Type : Axial Unit 1.00 5,880,280.00 5,880,280.00 -
Service : Perapihan, Pelicinan & Pelipatan Linen
Air Flow : 700 cfm
Ext. Static Press : 0.2 in/wg
Power : 50 W/ 220V/ 1Phs/ 50Hz
Exhaust Air Duct
- 425 x 200 m' 3.00 391,700.00 1,175,100.00 -
- 325 x 200 m' 4.00 329,020.00 1,316,080.00 -
- 250 x 150 m' 9.00 309,830.00 2,788,470.00 -
Sound attenuator
- 425 x 200 m' 3.00 1,261,580.00 3,784,740.00 -
Grille
- EAG : 250 x 250 Bh 3.00 347,460.00 1,042,380.00 -
- louvre : 450 x 450 Bh 1.00 421,180.00 421,180.00 -

• Exhaust air fan


Type : Axial Unit 1.00 5,880,280.00 5,880,280.00 -
Service : Pencucian & Pengeringan Linen Non Infeksius
Air Flow : 700 cfm
Ext. Static Press : 0.2 in/wg
Power : 50 W/ 220V/ 1Phs/ 50Hz
Exhaust Air Duct
- 425 x 200 m' 3.00 391,700.00 1,175,100.00 -
- 325 x 200 m' 4.00 329,020.00 1,316,080.00 -
- 250 x 150 m' 9.00 309,830.00 2,788,470.00 -
Sound attenuator
- 425 x 200 m' 3.00 1,261,580.00 3,784,740.00 -
Grille
- EAG : 250 x 250 Bh 3.00 347,460.00 1,042,380.00 -
- louvre : 450 x 450 Bh 1.00 421,180.00 421,180.00 -

Intake air fan


• Intake air fan
Type : Wall fan Unit 1.00 592,540.00 592,540.00 -
Service : Cuci Troli
Air Flow : 125 cfm
Ext. Static Press : 0.2 in/wg
Power : 10 W/ 220V/ 1Phs/ 50Hz

• Intake air fan


Type : Axial Unit 1.00 4,325,410.00 4,325,410.00 -
Service : Perendaman Linen Infeksius
Air Flow : 350 cfm
Ext. Static Press : 0.2 in/wg
Power : 22 W/ 220V/ 1Phs/ 50Hz
Intake Air Duct
- 325 x 200 m' 7.00 420,420.00 2,942,940.00 -
- 250 x 150 m' 9.00 309,830.00 2,788,470.00 -
Sound attenuator
- 325 x 200 m' 7.00 1,261,580.00 8,831,060.00 -
Grille
- EAG : 250 x 250 Bh 2.00 347,460.00 694,920.00 -
- louvre : 350 x 350 Bh 1.00 421,180.00 421,180.00 -

• Intake air fan


Type : Axial Unit 1.00 4,325,410.00 4,325,410.00 -
Service : Pencucian & Pengeringan Linen Infeksius
Air Flow : 500 cfm
Ext. Static Press : 0.2 in/wg
Power : 35 W/ 220V/ 1Phs/ 50Hz
Intake Air Duct
- 425 x 200 m' 3.00 391,700.00 1,175,100.00 -
- 325 x 200 m' 4.00 329,020.00 1,316,080.00 -
- 250 x 150 m' 9.00 309,830.00 2,788,470.00 -
Sound attenuator
- 425 x 200 m' 3.00 1,261,580.00 3,784,740.00 -
Grille
- EAG : 250 x 250 Bh 3.00 347,460.00 1,042,380.00 -
- louvre : 450 x 450 Bh 1.00 421,180.00 421,180.00 -

• Intake air fan


Type : Wall fan Unit 1.00 592,540.00 592,540.00 -
Service : Gudang Gas LPG
Air Flow : 80 cfm
Ext. Static Press : 0.2 in/wg
Power : 10 W/ 220V/ 1Phs/ 50Hz

• Intake air fan


Type : Axial Unit 1.00 4,325,410.00 4,325,410.00 -
Service : Perbaikan, Penyimpanan & Distribusi Linen
Air Flow : 430 cfm
Ext. Static Press : 0.2 in/wg
Power : 22 W/ 220V/ 1Phs/ 50Hz
Intake Air Duct
- 325 x 200 m' 7.00 329,020.00 2,303,140.00 -
- 250 x 150 m' 9.00 309,830.00 2,788,470.00 -
Sound attenuator
- 325 x 200 m' 7.00 1,261,580.00 8,831,060.00 -
Grille
- EAG : 250 x 250 Bh 2.00 347,460.00 694,920.00 -
- louvre : 350 x 350 Bh 1.00 421,180.00 421,180.00 -

• Intake air fan


Type : Axial Unit 1.00 5,880,280.00 5,880,280.00 -
Service : Perapihan, Pelicinan & Pelipatan Linen
Air Flow : 700 cfm
Ext. Static Press : 0.2 in/wg
Power : 50 W/ 220V/ 1Phs/ 50Hz
Intake Air Duct
- 425 x 200 m' 3.00 391,700.00 1,175,100.00 -
- 325 x 200 m' 4.00 329,020.00 1,316,080.00 -
- 250 x 150 m' 9.00 309,830.00 2,788,470.00 -
Sound attenuator
- 425 x 200 m' 3.00 1,261,580.00 3,784,740.00 -
Grille
- EAG : 250 x 250 Bh 3.00 347,460.00 1,042,380.00 -
- louvre : 450 x 450 Bh 1.00 421,180.00 421,180.00 -

• Intake air fan


Type : Axial Unit 1.00 5,880,280.00 5,880,280.00 -
Service : Pencucian & Pengeringan Linen Non Infeksius
Air Flow : 700 cfm
Ext. Static Press : 0.2 in/wg
Power : 50 W/ 220V/ 1Phs/ 50Hz
Intake Air Duct
- 425 x 200 m' 3.00 391,700.00 1,175,100.00 -
- 325 x 200 m' 4.00 329,020.00 1,316,080.00 -
- 250 x 150 m' 9.00 309,830.00 2,788,470.00 -
Sound attenuator
- 425 x 200 m' 3.00 1,261,580.00 3,784,740.00 -
Grille
- EAG : 250 x 250 Bh 3.00 347,460.00 1,042,380.00 -
- louvre : 450 x 450 Bh 1.00 421,180.00 421,180.00 -

4 Lantai 2 (Dua)
4.1 Pekerjaan AC VRF System
Indoor Unit c/w Accessories
• IU.A-02 Unit 1.00 9,462,310.00 9,462,310.00 DAIKIN
Model :
Type : Ceiling Mounted
Kapasitas : 7500 Btu/H
• IU.A-03 Unit 1.00 15,057,290.00 15,057,290.00 DAIKIN
Model :
Type : Ceiling Mounted
Kapasitas : 15400 Btu/H
• hanger, support dan asesoris Lot 1.00 481,300.00 481,300.00 -
• Kabel Power & Control
- Kabel Power dari PP-AC (ukuran disesuaikan dengan kap. AC) Lot 1.00 956,520.00 956,520.00 -
- Kabel Control Lot 1.00 768,000.00 768,000.00 -
• Pipa Refregerant c/w isolasi armaflex t = 19 mm, vinil, klem Lot 1.00 10,892,260.00 10,892,260.00 INSUFLEX atau setara
• Pipa Drainage PVC AW c/w isolasi armaflex t = 13mm, klem Lot 1.00 3,399,020.00 3,399,020.00 KEMBLA atau setara

4.2 Pekerjaan Exhaust


• Exhaust air fan
Type : Ceiling Fan Unit 8.00 409,650.00 3,277,200.00 -
Service : Toilet
Air Flow : 100 cfm
Ext. Static Press : 0.2 in/wg
Power : 10 W/ 220V/ 1Phs/ 50Hz
Instalasi exhaust air duct tanpa isolasi
- dia. 200 m 4.00 173,730.00 694,920.00 -
- dia. 150 m 4.00 118,800.00 475,200.00 -
- dia. 100 m 16.00 100,610.00 1,609,760.00 -
- louvre : 250 x 250 Bh 1.00 344,380.00 344,380.00 -

• Exhaust air fan


Type : Wall fan Unit 1.00 3,076,030.00 3,076,030.00 -
Service : Workshop peraltan medis, workshop penunjang medis
Air Flow : 700 cfm
Ext. Static Press : 0.2 in/wg
Power : 50 W/ 220V/ 1Phs/ 50Hz

• Exhaust air fan


Type : Wall fan Unit 1.00 3,196,040.00 3,196,040.00 -
Service : Gudang IPSRS
Air Flow : 350 cfm
Ext. Static Press : 0.2 in/wg
Power : 22 W/ 220V/ 1Phs/ 50Hz

• Exhaust air fan


Type : Wall fan Unit 1.00 594,000.00 594,000.00 -
Service : Gudang Spare part
Air Flow : 210 cfm
Ext. Static Press : 0.2 in/wg
Power : 10 W/ 220V/ 1Phs/ 50Hz

5 Lantai 3 (Tiga)
5.1 Pekerjaan AC VRF System
Indoor Unit c/w Accessories
• IU.A-04 Unit 1.00 18,734,070.00 18,734,070.00 DAIKIN
Model :
Type : Ceiling Mounted
Kapasitas : 24200 Btu/H
• IU.A-05 Unit 1.00 18,734,070.00 18,734,070.00 DAIKIN
Model :
Type : Ceiling Mounted
Kapasitas : 24200 Btu/H
• IU.A-06 Unit 1.00 18,734,070.00 18,734,070.00 DAIKIN
Model :
Type : Ceiling Mounted
Kapasitas : 24200 Btu/H
• IU.A-07 Unit 1.00 17,494,640.00 17,494,640.00 DAIKIN
Model :
Type : Ceiling Mounted
Kapasitas : 19100 Btu/H
• IU.A-08 Unit 1.00 15,020,930.00 15,020,930.00 DAIKIN
Model :
Type : Ceiling Mounted
Kapasitas : 7500 Btu/H
• IU.A-09 Unit 1.00 17,494,640.00 17,494,640.00 DAIKIN
Model :
Type : Ceiling Mounted
Kapasitas : 19100 Btu/H
• IU.A-10 Unit 1.00 15,020,930.00 15,020,930.00 DAIKIN
Model :
Type : Ceiling Mounted
Kapasitas : 7500 Btu/H
• IU.A-11 Unit 1.00 17,494,640.00 17,494,640.00 DAIKIN
Model :
Type : Ceiling Mounted
Kapasitas : 19100 Btu/H
• IU.A-12 Unit 1.00 16,857,120.00 16,857,120.00 DAIKIN
Model :
Type : Ceiling Mounted
Kapasitas : 9600 Btu/H

• hanger, support dan asesoris Lot 1.00 9,851,690.00 9,851,690.00 -


• Kabel Power & Control
- Kabel Power dari PP-AC (ukuran disesuaikan dengan kap. AC) Lot 1.00 4,565,770.00 4,565,770.00 -
- Kabel Control Lot 1.00 3,652,610.00 3,652,610.00 -
• Pipa Refregerant c/w isolasi armaflex t = 19 mm, vinil, klem Lot 1.00 68,787,910.00 68,787,910.00 INSUFLEX atau setara
• Pipa Drainage PVC AW c/w isolasi armaflex t = 13mm, klem Lot 1.00 13,757,580.00 13,757,580.00 KEMBLA atau setara

5.2 Pekerjaan Exhaust


• Exhaust air fan
Type : Ceiling Fan Unit 8.00 409,650.00 3,277,200.00 -
Service : Toilet
Air Flow : 100 cfm
Ext. Static Press : 0.2 in/wg
Power : 10 W/ 220V/ 1Phs/ 50Hz
Instalasi exhaust air duct tanpa isolasi
- dia. 200 m 4.00 173,730.00 694,920.00 -
- dia. 150 m 4.00 118,800.00 475,200.00 -
- dia. 100 m 16.00 100,610.00 1,609,760.00 -
- louvre : 250 x 250 Bh 1.00 344,380.00 344,380.00 -

• Exhaust air fan


Type : Wall fan Unit 1.00 594,000.00 594,000.00 -
Service : Gudang
Air Flow : 250 cfm
Ext. Static Press : 0.2 in/wg
Power : 22 W/ 220V/ 1Phs/ 50Hz

6 Lantai 4 (Empat)
6.1 Pekerjaan AC VRF System
Indoor Unit c/w Accessories
• IU.A-013 Unit 1.00 18,734,070.00 18,734,070.00 DAIKIN
Model :
Type : Ceiling Mounted
Kapasitas : 24200 Btu/H
• IU.A-14 Unit 1.00 18,734,070.00 18,734,070.00 DAIKIN
Model :
Type : Ceiling Mounted
Kapasitas : 24200 Btu/H
• IU.A-15 Unit 1.00 15,020,930.00 15,020,930.00 DAIKIN
Model :
Type : Ceiling Mounted
Kapasitas : 7500 Btu/H
• IU.A-16 Unit 1.00 17,494,640.00 17,494,640.00 DAIKIN
Model :
Type : Ceiling Mounted
Kapasitas : 19100 Btu/H

6.2 Pekerjaan Exhaust


• Exhaust air fan
Type : Ceiling Fan Unit 8.00 409,650.00 3,277,200.00 -
Service : Toilet
Air Flow : 100 cfm
Ext. Static Press : 0.2 in/wg
Power : 10 W/ 220V/ 1Phs/ 50Hz
Instalasi exhaust air duct tanpa isolasi
- dia. 200 m 4.00 173,730.00 694,920.00 -
- dia. 150 m 4.00 118,800.00 475,200.00 -
- dia. 100 m 16.00 100,610.00 1,609,760.00 -
- louvre : 250 x 250 Bh 1.00 344,380.00 344,380.00 -

• Exhaust air fan


Type : Wall fan Unit 1.00 594,000.00 594,000.00 -
Service : Penyimpanan & Cuci Troli
Air Flow : 250 cfm
Ext. Static Press : 0.2 in/wg
Power : 22 W/ 220V/ 1Phs/ 50Hz

• Exhaust air fan


Type : Ceiling Fan Unit 3.00 409,650.00 1,228,950.00 -
Service : Ganti APD & Locker
Air Flow : 100 cfm
Ext. Static Press : 0.2 in/wg
Power : 10 W/ 220V/ 1Phs/ 50Hz
Instalasi exhaust air duct tanpa isolasi
- dia. 150 m 4.00 118,800.00 475,200.00 -
- dia. 100 m 8.00 100,610.00 804,880.00 -
- louvre : 200 x 200 Bh 1.00 344,380.00 344,380.00 -
• Exhaust air fan
Type : Wall fan Unit 1.00 594,000.00 594,000.00 -
Service : Formula Bayi/Dapur Susu
Air Flow : 80 cfm
Ext. Static Press : 0.2 in/wg
Power : 10 W/ 220V/ 1Phs/ 50Hz

• Exhaust air fan


Type : Wall fan Unit 1.00 594,000.00 594,000.00 -
Service : Minuman
Air Flow : 210 cfm
Ext. Static Press : 0.2 in/wg
Power : 10 W/ 220V/ 1Phs/ 50Hz

• Exhaust air fan


Type : Axial Unit 1.00 11,328,670.00 11,328,670.00 -
Service : Pengolahan, Pemasakan & Penghangatan masakan
Air Flow : 6000 cfm
Ext. Static Press : 0.2 in/wg
Power : 350 W/ 220V/ 1Phs/ 50Hz
Exhaust Air Duct
- 850 x 400 m' 12.00 688,850.00 8,266,200.00 -
- 800 x 350 m' 3.00 489,440.00 1,468,320.00 -
- 575 x 350 m' 3.00 439,600.00 1,318,800.00 -
- 350 x 350 m' 16.00 389,740.00 6,235,840.00 -
Sound attenuator
- 850 x 400 m' 12.00 1,077,130.00 12,925,560.00 -
Grille
- EAG : 350 x 350 Bh 4.00 420,750.00 1,683,000.00 -
- louvre : 900 x 900 Bh 1.00 1,270,190.00 1,270,190.00 -

• Exhaust air fan


Type : Axial Unit 1.00 11,328,670.00 11,328,670.00 -
Service : Pengolahan, Pemasakan & Penghangatan masakan
Air Flow : 6000 cfm
Ext. Static Press : 0.2 in/wg
Power : 350 W/ 220V/ 1Phs/ 50Hz
Exhaust Air Duct
- 850 x 400 m' 9.00 688,850.00 6,199,650.00 -
- 800 x 350 m' 3.00 489,440.00 1,468,320.00 -
- 575 x 350 m' 3.00 439,600.00 1,318,800.00 -
- 350 x 350 m' 16.00 389,740.00 6,235,840.00 -
Sound attenuator
- 850 x 400 m' 9.00 1,077,130.00 9,694,170.00 -
Grille
- EAG : 350 x 350 Bh 4.00 420,750.00 1,683,000.00 -
- louvre : 900 x 900 Bh 1.00 1,270,190.00 1,270,190.00 -

Intake air fan


• Intake air fan
Type : Axial Unit 1.00 11,328,670.00 11,328,670.00 -
Service : Pengolahan, Pemasakan & Penghangatan masakan
Air Flow : 6000 cfm
Ext. Static Press : 0.2 in/wg
Power : 350 W/ 220V/ 1Phs/ 50Hz
Intake Air Duct
- 850 x 400 m' 7.00 1,003,340.00 7,023,380.00 -
Sound attenuator
- 850 x 400 m' 7.00 1,095,780.00 7,670,460.00 -
Grille
- EAG : 850 x 850 Bh 1.00 1,180,670.00 1,180,670.00 -
- louvre : 900 x 900 Bh 1.00 1,179,500.00 1,179,500.00 -

• Intake air fan


Type : Axial Unit 1.00 11,328,670.00 11,328,670.00 -
Service : Pengolahan, Pemasakan & Penghangatan masakan
Air Flow : 6000 cfm
Ext. Static Press : 0.2 in/wg
Power : 350 W/ 220V/ 1Phs/ 50Hz
Intake Air Duct
- 850 x 400 m' 7.00 1,003,340.00 7,023,380.00 -
Sound attenuator
- 850 x 400 m' 7.00 1,095,780.00 7,670,460.00 -
Grille
- EAG : 850 x 850 Bh 1.00 1,180,670.00 1,180,670.00 -
- louvre : 900 x 900 Bh 1.00 1,179,500.00 1,179,500.00 -

• Intake air fan


Type : Wall fan Unit 1.00 594,000.00 594,000.00 -
Service : Formula Bayi/Dapur Susu
Air Flow : 80 cfm
Ext. Static Press : 0.2 in/wg
Power : 10 W/ 220V/ 1Phs/ 50Hz

• Intake air fan


Type : Wall fan Unit 1.00 594,000.00 594,000.00 -
Service : Minuman
Air Flow : 210 cfm
Ext. Static Press : 0.2 in/wg
Power : 10 W/ 220V/ 1Phs/ 50Hz

7 Lantai Atap
7.1 Pekerjaan AC Single Split
• IU.B-01 Unit 1.00 17,494,640.00 17,494,640.00 DAIKIN atau setara
Model :
Type : Wall mounted
Kapasitas : 18000 Btu/H
• IU.B-02 Unit 1.00 17,494,640.00 17,494,640.00 DAIKIN atau setara
Model :
Type : Wall mounted
Kapasitas : 18000 Btu/H

• hanger, support dan asesoris Lot 1.00 2,096,140.00 2,096,140.00 -


• Kabel Power & Control
- Kabel Power dari PP-AC (ukuran disesuaikan dengan kap. AC) Lot 1.00 944,170.00 944,170.00 -
- Kabel Control Lot 1.00 768,000.00 768,000.00 -
• Pipa Refregerant c/w isolasi armaflex t = 19 mm, vinil, klem Lot 1.00 5,456,860.00 5,456,860.00 INSUFLEX atau setara
• Pipa Drainage PVC AW c/w isolasi armaflex t = 13mm, klem Lot 1.00 1,112,920.00 1,112,920.00 KEMBLA atau setara

7.2 Pekerjaan AC VRF System


Outdoor Unit c/w Accessories
• OU.A Unit 1.00 292,209,390.00 292,209,390.00 DAIKIN
Model :
Type : Cooling Only
Kapasitas : 290000 Btu/H

7.3 Pekerjaan Exhaust


• Exhaust air fan
Type : Wall fan Unit 1.00 594,000.00 594,000.00 -
Service : Mesin Dumb Waiter
Air Flow : 100 cfm
Ext. Static Press : 0.2 in/wg
Power : 10 W/ 220V/ 1Phs/ 50Hz

8 Atap
3.7.2 Pekerjaan Exhaust
• Pressurized air fan Unit 1.00 43,940,710.00 43,940,710.00 -
Type : Centrifugal
Air Flow : 19000 Cfm
Ext Static Press : 1.0 in/wg
Power : 5.5 kW/ 380V/ 3Phs/ 50Hz
lengkap dengan control panel Variable Speed Drive,
kabel fire resistant, pressure differensial sensor, kabel kontrol dan asesoris
lainnya.
• Instalasi pressureized duct
- Dia. 850 m' 6.00 1,638,630.00 9,831,780.00 -
- 1600 x 400 m' 18.00 1,183,100.00 21,295,800.00 -
- Pressurized air Grille 250 x 1200 Bh 5.00 1,087,680.00 5,438,400.00 -
- Intake Air Grille Dia. 850 + Filter Bh 1.00 2,543,050.00 2,543,050.00 -
TOTAL PEKERJAAN AC DAN VENTILASI MEKANIK
GRAND TOTAL PEKERJAAN MEP

C ALAT MESIN CUCI LINEN


a. MESIN BARIER WASHER Unit 1.00 2,192,640,000.00 2,192,640,000.00 -
b. TUMBLE DRYER Unit 1.00 144,107,930.00 144,107,930.00 -
c. ROLLER IRONER Unit 1.00 1,817,130,520.00 1,817,130,520.00 -
d. TRANSPORTASI AKOMODASI LS 1.00 5,008,040.00 5,008,040.00 -
TOTAL MESIN CUCI LINEN

95,000,000,000.00