Pimpina n Le mba ga
( Nam a Lengkap )
K e t u a Un it K e t u a Un it
Pe n g e lo la K e g ia t a n Pe n g e lo la K e g ia t a n
HARGA JUMLAH
NO URAIAN PEKERJAAN VOLUME S AT. S ATUAN HARGA
( Rp .) ( Rp . )
A. PEKERJAAN PERSIAPAN
1 Papan Proyek 1.00 Unit 500,000.00 500,000.00
2 Pek. Pengukuran dan Bow plank 52.00 m' 94,635.00 4,921,020.00
3 Pek. Listrik & Air kerja 1.00 ls 1,000,000.00 1,000,000.00
4 Pek. Laporan & Dokum entasi 1.00 ls 1,000,000.00 1,000,000.00
S ub To t a l A 7 ,4 2 1 ,0 2 0.00
B. PEKERJAAN PONDAS I & TANAH
1 Pek. Galian Tanah Pondasi 77.38 m3 70,625.00 5,464,962.50
2 Pek. Urug Tanah Kem bali 25.79 m3 32,912.50 848,813.38
3 Pek. Urug Tanah Peninggian peil Lantai ( t = 10 cm ) 19.55 m3 32,912.50 643,439.38
4 Pek. Pasir Urug
- Baw ah Pondasi 11.90 m3 208,250.00 2,478,175.00
- Baw ah Lantai 19.91 m3 208,250.00 4,146,257.50
5. Pek. Pondasi Tapak P1 ( 100 x 100 x 20 - 40 )
- Beton K-225 3.92 m3 1,077,990.43 4,225,722.49
- Pem besian 473.59 kg 13,408.45 6,350,107.84
- Bekisting 21.28 m2 271,656.00 5,780,839.68
6. Pekerjaan Pondasi Batu Belah P2 24.26 m3 585,821.77 14,212,036.14
7. Pek. Sloof beton ( 15/30 )
- Beton K-225 3.83 m3 1,077,990.43 4,128,703.35
- Pem besian 816.72 kg 11,906.95 9,724,644.20
- Bekisting 51.03 m2 293,106.00 14,957,199.18
S ub To t a l B 7 2 ,9 6 0 ,9 0 0.62
C. PEKERJAAN S TRUKTUR BETON
C1. STRUKTUR BETON
1. Pek. Kolom Beton K1 (30/30)
- Beton K-225 6.91 m3 1,077,990.43 7,448,913.87
- Pem besian 1005.19 kg 11,906.95 11,968,747.07
- Bekisting 92.16 m2 571,043.00 52,627,322.88
2. Pek. Kolom Praktis KP (15/15)
- Beton K-175 1.08 m3 916,584.57 989,911.34
- Pem besian 193.78 kg 11,906.95 2,307,328.77
- Bekisting 28.80 m2 571,043.00 16,446,038.40
3. Pek. Balok Beton (20/30)
- Beton K-225 3.33 m3 1,077,990.43 3,589,708.13
- Pem besian 663.71 kg 11,906.95 7,902,761.78
- Bekisting 44.40 m2 293,106.00 13,013,906.40
4. Pek. Beton Balok Lintel BL (15/15), RB (15/15)
- Beton K-175 1.80 m3 916,584.57 1,649,852.23
- Pem besian 408.26 kg 11,906.95 4,861,131.41
- Bekisting 34.66 m2 293,106.00 10,159,053.96
5. Pek. Ram p Beton T= 10 cm
- Beton K-175 0.35 m3 916,584.57 320,804.60
- Pem besian 42.24 kg 11,906.95 502,949.57
- Bekisting 0.69 m2 293,106.00 202,243.14
6. Pek. Kolom S opi S opi (30/30)
- Beton K-225 0.75 m3 1,077,990.43 808,492.82
- Pem besian 84.12 kg 11,906.95 1,001,612.63
- Bekisting 9.96 m2 293,106.00 2,919,335.76
7. Pek. Ring Balok Praktis S opi S opi (15/15)
HARGA JUMLAH
NO URAIAN PEKERJAAN VOLUME S AT. S ATUAN HARGA
( Rp .) ( Rp . )
- Beton K-225 0.96 m3 1,077,990.43 1,034,870.81
- Pem besian 194.91 kg 11,906.95 2,320,783.62
- Bekisting 12.81 m2 293,106.00 3,754,687.86
8. Pek. Plat Beton Topi Topi (10/60)
- Beton K-225 0.86 m3 1,077,990.43 927,071.77
- Pem besian 182.42 kg 11,906.95 2,172,065.82
- Bekisting 12.24 m2 293,106.00 3,587,617.44
C2. PEKERJAAN ATAP
1 Rangka Atap Baja Ringan 205.53 m2 150,000.00 30,829,500.00
2 Atap Spandek t = 0,35 m m 205.53 m2 75,000.00 15,414,750.00
3 Listplank GRC 73.80 m' 45,097.50 3,328,195.50
4 Pasang Alum unium Foil, Glasw ool, Roofm esh 140.00 m2 20,034.21 2,804,789.40
S ub To t a l A 2 0 4 ,8 9 4 ,4 4 6 .9 9
D. PEKERJAAN PLAFOND
1 Plafond Gipsum 9 m m + Rangka Hollow 4/4 ; t = 136.49 m2 56,265.00 7,679,609.85
2 Plafond Calsiboard 4,5 m m + Rangka 53.31 m2 56,265.00 2,999,487.15
3 List Gipsum 5 cm 94.85 m' 22,143.00 2,100,263.55
S ub To t a l D 1 2 ,7 7 9 ,3 6 0 .5 5
E. PEKERJAAN PASANGAN
1 Pasangan Dinding Bata 250.73 m2 90,000.00 22,565,700.00
2 Plester + Acian 496.17 m3 68,112.00 33,795,131.04
3 Pasangan Rolaag Bata 19.80 m' 152,142.38 3,012,419.03
4 Pasangan Saluran Terbuka ( U Pasangan Bata ) 40.00 m' 90,000.00 3,600,000.00
5 Pekerjaan Rabat Beton t= 5 cm baw ah lantai 9.96 m3 216,584.57 2,157,182
6 Pekerjaan Rabat Beton t= 5 cm Keliling bangunan 2.04 m3 216,584.57 441,832.52
7 Pekerjaan Meja Beton Wastafel t= 8 cm 0.10 m3 216,584.57 21,658.46
8 Pasangan Keram ik lantai 40/40 Polished 136.40 m2 226,281.00 30,864,728.40
9 Pasangan keam ik lantai 30/30 Polished 52.00 m2 244,777.50 12,728,430.00
10 Pasangan keam ik lantai 20/20 Unpolished 3.04 m2 269,923.50 820,567.44
11 Pasangan Plint keram ik Lantai 40/10 polised 97.40 m' 35,873.75 3,494,103.25
12 Pasangan keram ik Bak & Meja Wastafel 20/20 1.77 m2 269,923.50 477,764.60
13 Pasangan Keram ik Dinding 30/60 Polished 5.29 m2 125,321.50 662,950.74
14 Pasangan Batu Alam Candi Kolom Entrace 7.62 m2 150,000.00 1,143,000.00
15 Pek. Logo & Tulisan 1.00 ls 3,000,000.00 3,000,000.00
16 List dinding Kusen 97.36 m' 22,143.00 2,155,842.48
S ub To t a l E 1 2 0,9 4 1 ,3 1 0.26
F. PEKERJAAN KUS EN PINTU & JENDELA
1 Kusen/Pintu Type P1 1.00 unit 1,100,000.00 1,100,000.00
2 Kusen/Pintu Type P2 3.00 unit 1,200,000.00 3,600,000.00
3 Kusen/Pintu Type P3 1.00 unit 1,000,000.00 1,000,000.00
4 Kusen/ Jedela Type J1 2.00 unit 550,000.00 1,100,000.00
5 Kusen/ Jedela Type J2 9.00 unit 650,000.00 5,850,000.00
6 Kusen/Jendela Type J3 1.00 unit 750,000.00 750,000.00
7 Kusen/Jendela Type BV 1.00 unit 900,000.00 900,000.00
8 Tralis Ventilasi Teras (Besi Hollow ) 6.65 m' 1,250,000.00 8,312,500.00
S ub To t a l F 2 2 ,6 1 2 ,5 0 0.00
G. PEKERJAAN PENGECATAN
1 Pek. Pengecatan Dinding Interior 248.08 m2 32,599.60 8,087,308.77
2 Pek. Pengecatan Dinding S etaraterior 248.08 m2 32,599.60 8,087,308.77
3 Pek. Pengecatan Plafond 189.80 m2 32,599.60 6,187,404.08
4 Pek. Pengecatan Listplank 22.14 m2 47,866.50 1,059,764.31
S ub To t a l G 2 3 ,4 2 1 ,7 8 5.93
H. PEKERJAAN PLUMBING & S ANITAIR
1 Instalasi Pipa PVC AW 4'' 16.00 m' 173,593.75 2,777,500.00
2 Instalasi Pipa PVC AW 2'' 12.00 m' 100,993.75 1,211,925.00
3 Instalasi Pipa PVC AW 3/4'' 20.00 m' 21,400.00 428,000.00
4 Instalasi Pipa PVC AW 1/2'' 15.00 m' 74,593.75 1,118,906.25
5 Septic Tank dan Rem besan 1.00 unit 2,000,000.00 2,000,000.00
6 Pe m a sa ng a n Clo se d Jo ng ko k 1.00 bh 772,860.00 772,860.00
7 Pe m a sa ng a n Kra n Air 2.00 bh 38,362.50 76,725.00
8 Pe m a sa ng a n Wa sta fe l + Kra n 2.00 bh 694,732.50 1,389,465.00
9 Pe m a sa ng a n Ce rm in Wa sta fe l 100x 200 1.00 unit 157,547.50 157,547.50
S ub To t a l H 9 ,9 3 2 ,9 2 8.75
HARGA JUMLAH
NO URAIAN PEKERJAAN VOLUME S AT. S ATUAN HARGA
( Rp .) ( Rp . )
I. PEKERJAAN LIS TRIK
1 Penyam bungan daya Listrik 5500.00 VA 950.00 5,225,000.00
2 Perijinan Sertifikat Layak Operasi 5500.00 VA 200,000.00 200,000.00
3 Panel Listrik 1.00 unit 2,000,000.00 2,000,000.00
4 Pek. Instalasi Kabel Feeder NYY 4x10 m m 2 2.00 m' 220,000.00 440,000.00
5 Pek. Instalasi Penerangan& Pow er NYM 3x2,5 66.00 ttk 80,000.00 5,280,000.00
6 Pe k. Insta la si Po we r AC 2.00 ttk 200,000.00 400,000.00
7 Pe m a sa ng a n La m pu T KI 2x 36 W 16.00 bh 150,000.00 2,400,000.00
8 Pe m a sa ng a n La m pu Ba re t Ko ta k 18/ 22W 7.00 bh 300,000.00 2,100,000.00
9 Pe m a sa ng a n La m pu E27ESS 8 wa tt + DL 4'' 3.00 bh 60,000.00 180,000.00
10 Pe m a sa ng a n Sa kla r Eng kle 5.00 bh 25,000.00 125,000.00
11 Pe m a sa ng a n Sa kla r Do uble 4.00 bh 35,000.00 140,000.00
12 Pe m a sa ng a n Sto p Ko nta k Sing le 9.00 bh 20,000.00 180,000.00
13 Pe m a sa ng a n Sto p Ko nta k Ga nda 16.00 bh 25,000.00 400,000.00
14 Pe m a sa ng a n Sto p Ko nta k AC 2.00 bh 40,000.00 80,000.00
15 Pe m a sa ng a n AC Split Wa ll 2 PK 2.00 unit 2,500,000.00 5,000,000.00
16 Gro unding ( m a x 2 Ohm ) 1.00 lot 1,000,000.00 1,000,000.00
S ub To t a l H 2 5 ,1 5 0 ,0 0 0.00
J. LAIN-LAIN
1 IMB 1.00 VA 1,000,000.00 1,000,000.00
2 Transportasi 2.00 VA 500,000.00 1,000,000.00
3 Ketua Unit Pengelola Teknis 4.00 unit 400,000.00 1,600,000.00
4 Ketua Unit Pengelola Keuangan 4.00 m' 400,000.00 1,600,000.00
5 Anggota Pengelola Teknis 8.00 ttk 300,000.00 2,400,000.00
6 Ang g o ta Pe ng e lo la Ke ua ng a n 8.00 ttk 300,000.00 2,400,000.00
S ub To t a l J 10,000,000.00
P a ja k P P H ( 1 0 % )
3 4 ,6 8 8 ,0 0 0 .0 0
P a ja k P P N ( 1 ,5 % ) 5 ,2 0 3 ,0 0 0 .0 0
J UM LAH TO TAL BI AYA KO N S TRUKS I + P AJ AK 5 5 0 ,0 0 5 ,2 5 3 .1 0
P EM BULATAN 5 5 0 ,0 0 0 ,0 0 0 .0 0
KOEFISIEN SATUAN P EKERJAAN
Vo lum e per
Satuan
satuan Harg a Jum lah Jum lah Harg a KETERANG
No Uraian Pekerjaan Vo lum e Satuan Ko m po nen Biaya Ko m po nen Jum lah Harg a
pekerjaan Satuan Kebutuhan To tal AN
Biaya
(Ko efisien)
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12)
I Pekerjaan Persiapan
1.1 Pengukuran dan Pemasangan Bouwplank UPAH
52.00 M1 0.100 Pekeja HOK 90,000 5.200 9,000 468,000
0.100 Tukang HOK 120,000 5.200 12,000 624,000
0.010 Kepala Tukang HOK 135,000 0.520 1,350 70,200
0.005 Mandor HOK 125,000 0.260 625 32,500
BAHAN
0.012 Kayu Kelas III Bh 3,900,000 0.624 46,800 2,433,600
0.020 Paku 2''-3'' Kg 18,000 1.040 360 18,720
0.007 Kayu Papan 3/20 M3 3,500,000 0.364 24,500 1,274,000
SUB TOTAL 1.2 94,635 4,921,020
II Pekerjaan Tanah dan Pondasi
2.1 Pekerjaan Galian Tanah Pondasi Batu Belah UPAH
77.38 M3 0.750 Pekeja HOK 90,000 58.035 67,500 5,223,150
0.025 Mandor HOK 125,000 1.935 3,125 241,813
Jenis Pekerjaan : Membuat Beton Mutu F'c = 7.4 Mpa (K 100), Slump (12 ± 2) cm,W/c= 0.87
Satuan / Unit : M3
Analisa : AHSP PU A.4.1.1.1
Jenis Pekerjaan : Membuat Beton Mutu F'c = 9.8 Mpa (K 125),Slump (12± 2) cm,W/c= 0.78
Satuan / Unit : M3
Analisa : AHSP PU A.4.1.1.2
Jenis Pekerjaan : Beton Mutu F'c = 14,5 Mpa (K 175),Slump (12± 2) cm,W/c = 0,66
Satuan / Unit : M3
Analisa : AHSP PU A.4.1.1.5
Jenis Pekerjaan : Beton Mutu F'c = 16,9 Mpa (K 200),Slump (12± 2) cm,W/c = 0,61
Satuan / Unit : M3
Analisa : AHSP PU A.4.1.1.6
Jenis Pekerjaan : Beton Mutu F'c = 21,7 Mpa (K 250),Slump (12 ± 2) cm,W/c = 0,56
Satuan / Unit : M3
Analisa : AHSP PU A.4.1.1.8
Jenis Pekerjaan : Beton Mutu F'c = 24,0 Mpa (K 275),Slump (12 ± 2) cm,W/c = 0,53
Satuan / Unit : M3
Analisa : AHSP PU A.4.1.1.8
No Uraian Satuan Koefisien Harga Satuan Jumlah Harga
A. TENAGA
1 Pekerja OH 1.6500 Rp 90,000.00 Rp 148,500.00
2 Tukang OH 0.2750 Rp 120,000.00 Rp 33,000.00
3 Kepala Tukang OH 0.0280 Rp 135,000.00 Rp 3,780.00
4 Mandor OH 0.0830 Rp 125,000.00 Rp 10,375.00
Jumlah Tenaga Kerja Rp 195,655.00
B. BAHAN
1 Semen Porland kg 406.00 Rp 1,375.00 Rp 558,250.00
2 Pasir Beton kg 684.00 Rp 132.14 Rp 90,383.76
3 Kerikil kg 1,026.00 Rp 148.14 Rp 151,991.64
4 Air Liter 215.00 Rp 125.00 Rp 26,875.00
Jumlah Bahan Rp 827,500.40
C. PERALATAN
Jumlah Peralatan Rp -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) Rp 1,023,155.40
E Overhead & Profit 10% X D Rp 102,315.54
F Harga Satuan Pekerjaan ( D + E ) Rp 1,125,470.94
Jenis Pekerjaan : Beton Mutu F'c = 26,4 Mpa (K 300),Slump (12± 2) cm,W/c = 0,52
Satuan / Unit : M3
Analisa : AHSP PU A.4.1.1.8
Jenis Pekerjaan : Pasangan Dinding Bata Tebal 1/2 Bata Camp. 1Pc: 2 PP
Satuan / Unit : M2
Analisa : AHSP PU A.4.4.1.7
Jenis Pekerjaan : Pasangan Dinding Bata Tebal 1/2 Bata Camp. 1Pc: 3 PP
Satuan / Unit : M2
Analisa : AHSP PU A.4.4.1.8
Jenis Pekerjaan : Pasangan Dinding Bata Tebal 1/2 Bata Camp. 1Pc: 4 PP
Satuan / Unit : M2
Analisa : AHSP PU A.4.4.1.9
Jenis Pekerjaan : Pasangan Dinding Bata Tebal 1/2 Bata Camp. 1Pc: 5 PP
Satuan / Unit : M2
Analisa : AHSP PU A.4.4.1.10
Jenis Pekerjaan : Memasang Langit-Langit Tripleks Ukuran (120 x 240) cm, tebal 4 mm
Satuan / Unit : M2
Analisa : AHSP PU A.4.5.1.5
Jenis Pekerjaan : Membuat dan Memasang Kusen Pintu dan Kusen Jendela, Kayu Kelas I
Satuan / Unit : M3
Analisa : AHSP PU A.4.6.1.1
Jenis Pekerjaan : Membuat dan Memasang Daun Pintu Panel Kayu Kelas II
Satuan / Unit : M2
Analisa : AHSP PU A.4.6.1.5
Jenis Pekerjaan : Memasang Listplank Uk. 2.5 x 25 cm Kayu Kelas I atau Kelas II
Satuan / Unit : M1
Analisa : AHSP PU A.4.6.1.21
Jenis Pekerjaan : Cat Bidang Kayu Baru ( 1 x Plamir,1 x Cat Dasar 2x Cat Penutup)
Satuan / Unit : M2
Analisa : AHSP PU A.4.7.1.4
Jenis Pekerjaan : Pengecatan Tembok Baru (1 x Plamir,1 x Cat Dasar,2 x Cat Penutup)
Satuan / Unit : M2
Analisa : AHSP PU A.4.7.1.10
UPAH
NO. TENAGA SATUAN HARGA
1 Mandor Orang Rp 125,000.00
2 Kepala Tukang Orang Rp 135,000.00
3 Tukang Orang Rp 120,000.00
4 Pekerja Orang Rp 90,000.00
BAHAN
NO. MATERIAL BAHAN SATUAN HARGA
1 Air Liter Rp 125.00
2 Atap Seng Genteng Lembar Rp 70,000.00
3 Batu Bata Buah Rp 800.00
4 Batu Kali/Batu belah (Sungaai/Gunung) M 3 Rp 195,000.00
5 Batu Belah 5 - 7 M 3 Rp 185,000.00
6 Batu Pecah 2 - 3 M 3 Rp 310,000.00
7 Besi Beton Polos Kg Rp 8,500.00
8 Besi Beton Ulir Kg Rp 9,800.00
9 Besi Polos Dia. 8 mm Batang Rp 45,000.00
10 Besi Polos Dia. 10 mm Batang Rp 68,000.00
11 Besi Polos Dia. 12 mm Batang Rp 94,000.00
12 Besi Ulir Dia. 12 mm Batang Rp 102,000.00
13 Besi Polos Dia. 13 mm Batang Rp 112,500.00
14 Bubungan Genteng M1 Rp 45,000.00
15 Besi Baja IWF Kg Rp 18,000.00
16 Besi Strip Profil Kg Rp 17,000.00
17 Baja Ringan C75x0,75 mm Batang Rp 75,000.00
18 Cat Dasar Tembok/Sealer Setara Vinilex Kg Rp 30,000.00
19 Cat Dasar Kayu Kg Rp 50,000.00
20 Cat Kayu Mengkilat Kg Rp 60,000.00
21 Cat Kayu Penutup Kg Rp 55,000.00
22 Cat Menie Besi Kg Rp 35,000.00
23 Cat Dasar Tembok Kg Rp 40,000.00
24 Cat Tembok Setara Vinilex Kg Rp 50,000.00
25 Dempul Kayu Kg Rp 18,000.00
26 Dolken Kayu Ø 8 - 10/400 cm Batang Rp 70,000.00
27 Door Holder Pasang Rp 130,000.00
28 Engsel Jendela Pasang Rp 25,000.00
29 Engsel Pintu Pasang Rp 25,000.00
30 Floor Drain Buah Rp 25,000.00
31 Gagang Jendela Buah Rp 15,000.00
32 Gypsum Board Tebal 9 mm Lembar Rp 120,000.00
33 Hak Angin Pasang Rp 16,000.00
34 Jaring Kawat Baja Kg Rp 35,000.00
35 Kaca Bening Uk. 3 mm M 2 Rp 85,000.00
36 Kaca Bening Uk. 5 mm M 2 Rp 110,000.00
37 Kaca Rayband Uk. 5 mm M 2 Rp 130,000.00
38 Kaso-Kaso (5 x 7) cm M 3 Rp 3,250,000.00
39 Kawat Beton Kg Rp 19,000.00
40 Kayu Kelas I (Seumantok /Ulim /dll) M 3 Rp 5,500,000.00
41 Kayu Kelas II (Kamper /Kruing /dll) M3 Rp 4,750,000.00
42 Kayu Kelas III (Borneo /dll) M3 Rp 3,900,000.00
43 Kayu Kelas IV (Sengon /dll) M3 Rp 3,500,000.00
44 Kayu Dolken Btg Rp 70,000.00
45 Keramik Uk. 10 x 10 cm Bh Rp 2,000.00
46 Keramik Uk. 20 x 20 cm Bh Rp 3,000.00
47 Keramik UK. 30 x 30 cm Bh Rp 5,000.00
48 Keramik Uk. 40 x 40 cm Bh Rp 7,000.00
49 Keramik Uk. 60 x 60 cm Bh Rp 30,000.00
50 Keramik Uk. 20 x 25 cm Bh Rp 8,000.00
51 Kertas Amplas Lembar Rp 2,500.00
52 Kloset Duduk Keramik Setara toto + Tabung Buah Rp 1,500,000.00
53 Kloset Jongkok Keramik Setara toto Buah Rp 400,000.00
54 Kran Air 3/4" Buah Rp 20,000.00
55 Kuas Cat Buah Rp 15,000.00
56 Kunci Pintu (Standar) Buah Rp 150,000.00
57 Kunci Pintu Biasa Buah Rp 100,000.00
58 Karawang /Roster Buah Rp 50,000.00
59 Lampu Hemat Energi 11 Watt Setara Hannochs Buah Rp 35,000.00
60 Lampu Hemat Energi 18 Watt Setara Hannochs Buah Rp 40,000.00
61 Lampu Hemat Energi 20 Watt Setara Hannochs Buah Rp 45,000.00
62 Lem Kayu Kg Rp 18,000.00
63 List Eternit Kayu M1 Rp 8,000.00
64 Minyak Cat Liter Rp 25,000.00
65 Minyak Bekisting Liter Rp 8,000.00
66 Multipleks 3 mm Lembar Rp 80,000.00
67 Multipleks 4 mm Lembar Rp 90,000.00
68 Multipleks 6 mm Lembar Rp 130,000.00
69 Multipleks 9 mm Lembar Rp 150,000.00
70 Pacok Jendela dan Ventilasi Pasang Rp 8,000.00
71 Paku Asbes Kg Rp 20,000.00
72 Paku Beton 8 Inci Kotak Rp 19,000.00
73 Paku Kait Buah Rp 1,000.00
74 Paku Kayu Kg Rp 18,000.00
75 Paku Triplek Kg Rp 19,000.00
76 Paku Seng Kg Rp 20,000.00
77 Paku Sumbat Buah Rp 1,200.00
78 Paku Sekrup Kg Rp 24,000.00
79 Pasir Batu (Sirtu) - Material Jalan M3 Rp 300,000.00
80 Pasir Beton / Kerikil M3 Rp 200,000.00
81 Pasir Pasang M3 Rp 185,000.00
82 Pasir Urug M3 Rp 150,000.00
83 Pelumas / Oil Liter Rp 35,000.00
84 Plamur Kayu Kg Rp 25,000.00
85 Plamur Tembok Kg Rp 30,000.00
86 Plywood Tebal 9 mm Lembar Rp 140,000.00
87 Plint Keramik Buah Rp 3,000.00
88 Residu Kg Rp 10,000.00
89 Reservoir Air 1000 Liter Buah Rp 1,200,000.00
90 Reservoir Air 1500 Liter Buah Rp 1,850,000.00
91 Schakelar Buah Rp 12,000.00
92 Semen @ 40 Kg Buah Rp 55,000.00
93 Semen @ 40 Kg Kg Rp 1,375.00
94 Semen Putih @ 50 Kg Zak Rp 90,000.00
95 Semen Warna Kg Rp 18,000.00
96 Seng Genteng Metal M2 Rp 65,000.00
97 Seng BJLS 0,20 Cat Pabrik M2 Rp 65,000.00
98 Spandek t = 0,35 mm M2 Rp 70,000.00
99 Seng Gelombang BJLS 30 M2 Rp 47,500.00
100 Seng Plat BJLS 20 M2 Rp 55,000.00
101 Sekrup Fixer Buah Rp 500.00
102 Sealant Kg Rp 15,000.00
103 Sumur + Pompa Tangan Terpasang Unit Rp 1,750,000.00
104 Tanah Timbun M3 Rp 65,000.00
105 Teralis Besi M2 Rp 375,000.00
106 Titik Lampu + Instalasi Titik Rp 150,000.00
107 Urinoir Keramik Buah Rp 2,350,000.00
108 Zakering Buah Rp 300,000.00
109 Pemasangan Atap Baja Ringan M2 Rp 300,000.00
110 Wire Mesh (Ulir) Titik Rp 150,000.00
111 Tiang Pancang M1 Rp 250,000.00
112 Pipa PVC 1" Batang Rp 35,000.00
113 Pipa PVC 2" Batang Rp 55,000.00
114 Pipa PVC 3" Batang Rp 100,000.00
115 Pipa PVC 4" Batang Rp 110,000.00
116 Wastafel unit Rp 500,000.00
117 Pipa PVC 4" Batang Rp 110,000.00
No. Alat
1 Stamper Jam Rp 25,000.00
2 Dump Truck Jam Rp 75,000.00
3 Molen Jam Rp 50,000.00