DELHI INTERNATIONAL AIRPORT

ETA CONSORTIUM
Form No- 7.4.17 A

MATERIAL INSPECTION REQUEST FOR L SHAPE GI SHEET

MIR Ref. No. / Rev. No. MIR/HVAC/ 001 Rev A Date / Time : 21.07.08

Material Description: 1) 26 G, L SHAPE GI SHEET- 293.4 Sqmt


2) 24 G, L SHAPEGI SHEET- 518.1 Sqmt

Manufacturer: ALPHA DUCT PVT. LTD, THANE Discipline: HVAC


Supplier: ALPHA DUCT PVT. LTD, THANE MAR Approval No.: DIAL-LT-R-H3-001MA-DOC-025 Rev B

Attached Documentation with Delivery: Yes / No Document Identification No.

Approval of MAR (Material Approval Request) YES


Delivery Note / Delivery Order Challan No. YES 0440 Dated 25/06/08
Site Receipt
Manufacture's Test Certificates YES 14315/1
Certificate of Origin incase of Foreign Materials
Any other Document/GRN No YES 083 Dated 30/06/08

Receiving Inspection / Verification of Compliance By Storekeeper / Discipline Engineer


Received materials are in good condition and quantity as per attached delivery note.
NAME: SIGNATURE: DATE:
Inspection / Verification (By SubContractor QA/QC)
Conforming / Accepted
Material has be inspected and as per approved
material submittal & Technical Data.

Non-Conforming / Rejected
Comments / Remarks:

Contractor's Engineer Assessment + Comments (tick box)


Level - A Level - B Level - C Level - D

Approved Approved as Noted Not Approved Rejected

SubContractor – ETA
Inspection by: ENGINEER – I/C ETA – QA / QC I/C L&T GMR

NAME

SIGNATURE

DATE
DELHI INTERNATIONAL AIRPORT
ETA CONSORTIUM

INSPECTION REQUEST FOR PASSIVATION & INITIAL FILLING OF CHEMICALS IN CHW


PIPING NETWORK
Description of Work to be inspected: Passivation & Initial Filling of ITR Ref. No. / Rev. No. L & T/ETA/HVAC/ 2850 Rev A
Chemicals in CHW Water Piping Network.
Proposed Date / Time : 19/5/2010

( AS per Attached Highlighted Drawing) Method Statement No. DIAL-LT-R-H3-001NT-DOC-055 REV A

Pour Card Ref: N/A

Check Sheet:

DIAL-LT-R-H3-001HL-DWG-248 R- A
DIAL-LT-R-H3-001HL-DWG-247 R- E
DIAL-LT-R-H3-003HL-DWG-201 R- 0
DIAL-LT-R-H3-003HL-DWG-201 R- 0
Drawing No:
DIAL-LT-R-H3-003HL-DWG-201 R- 0
DIAL-LT-R-H3-003HL-DWG-230 R- 0
DIAL-LT-R-H3-003HL-DWG-230 R- 0
DIAL-LT-R-H3-003HL-DWG-230 R- 0

Inspection Location: (specific detail required): PTB, PIER AB, PIER CD.

Sub-basement,basement,Arrival,
ZONE / AREA ALL ZONES FLOOR / LEVEL
Mezzanine,Departure,Appron.

Location / Gridlines ALL GRIDS

Issued by Engineer Signature: Date: Time:

Received by Sub Con. QC ENG:


Signature: Date: Time:

Received by Con. QC ENG:


Signature: Date: Time:

SubContractor's Comments / Remarks :

Contractor's Comments / Remarks :

Contractor's Engineer Assessment + Comments (tick box)

Level - A Level - B Level - C Level - D

Approved Approved as Noted Not Approved Rejected

Subcontractor – ETA
Inspection by: ENGINEER – I/C ETA – QA / QC I/C L&T DIAL

NAME

SIGNATURE

DATE
DELHI INTERNATIONAL AIRPORT
ETA CONSORTIUM
PACKAGE T3 - 006 HVAC WORKS

NOTICE FOR INSTALLATION


We are pleased to inform you that the following activity is going to start on dated …………….
Doc. No. Date

Rev. No.

REFERENCE NO. :

NAME OF THE ACTIVITY :

AREA / LOCATION :

LEVEL :

GRID :

Please you confirm/allow to process the following activity in a specified area.

FIRST CHECK FINAL CHECK

DATE

TIME

PRESSURE

Contractor's Comments / Remarks :

Contractor's Engineer Assessment + Comments (tick box)


Level - A Level - B Level - C Level - D

Approved Approved as Noted Not Approved Rejected

Subcontractor – ETA
Inspection by: ENGINEER – I/C ETA – QA / QC I/C L&T GMR

NAME

SIGNATURE

DATE
DUBAI INTERNATIONAL AIRPORT
EXPANSION PHASE II
TERMINAL III, CONCOURSE II AND CAR PARK
AX 056 EARTH WORKS AND PILING

DOCUMENT TITLE