DAFTAR KESEPAKATAN HARGA SATUAN BAHAN / MATERIAL DAN UPAH SEMESTER 2

DINAS BINA MARGA, DINAS PENGELOLAAN SUMBER DAYA AIR & PERTAMBANGAN
DAN DINAS CIPTA KARYA & TATA RUANG
KABUPATEN CIREBON
TAHUN ANGGARAN 2014

NO URAIAN BAHAN/MATERIAL SAT. HARGA KET


KESEPAKATAN
A. BAHAN :
I. BATU
1 Abu Batu m3 172,500.00
2 Atras ( tanah urug ) m3 125,000.00
3 Base course A m3 175,000.00
4 Base course B m3 165,800.00
5 Batu apung kg 4,300.00
6 Batu belah 10/15 cm m3 135,000.00
7 Batu belah 15/20 cm m3 135,000.00
8 Batu pecah mesin 0.5-1 cm m3 180,000.00
9 Batu pecah mesin 1-2 cm m3 180,000.00
10 Batu pecah mesin 2-3 cm m3 180,000.00
11 Batu tempel Palimanan 10 X 20 bh 1,500.00
12 Batu tempel kapur tekstur tidak rata bh 2,000.00
13 Kapur bakar m3 70,000.00
14 Kapur Sirih kg 2,000.00
15 Kerikil m3 65,000.00

II. PASIR
1 Pasir beton m3 150,000.00
2 Pasir aspal m3 150,000.00
3 Pasir pasang m3 143,000.00
4 Pasir urug m3 110,000.00
5 Sirtu m3 110,000.00
6 Sirtu tersaring m3 115,000.00
7 Tanah urug pilhan m3 125,000.00
8 Tanah urug biasa m3 100,000.00
III. BESI / PIPA / KAWAT
1 Besi WF/Besi Profil kg 11,250.00
2 Besi strip kg 11,250.00
3 Besi beton kg 11,000.00
4 Besi stainless dia. 0,5" m' 38,000.00
5 Besi stainless dia. 1" m' 60,000.00
6 Besi stainless dia. 1,5" m' 75,000.00
7 Besi stainless dia. 2" m' 80,000.00
8 Besi stainless dia. 2,5" m' 125,000.00
9 Besi stainless dia. 3" m' 152,000.00
10 Besi galvanis dia. 0.5" m' 25,000.00
11 Besi galvanis dia. 1" m' 27,000.00
12 Besi galvanis dia. 1.5" m' 45,000.00
13 Besi galvanis dia. 2" m' 57,000.00
14 Besi galvanis dia. 2.5" m' 80,500.00
15 Besi galvanis dia. 3" m' 96,000.00
16 Besi biasa dia. 2" btg 250,000.00
17 Besi biasa dia. 3" btg 310,000.00
18 Dop besi Ø 3 " bh 60,000.00
19 Kawat beton / Kawat tali kg 18,000.00
20 Kawat bronjong dia. 4 mm kg 20,000.00
21 Kawat galvanis dia. 4 mm kg 20,000.00
22 Kawat galvanis dia. 6 mm kg 24,000.00
23 Kawat duri m' 20,000.00
24 Pipa besi galvanis 2" btg 324,000.00
25 Pipa besi galvanis 3" btg/6m' 600,000.00
26 Pipa PVC Ø 2" S-12,5 ( 8 - 10 bar ) m' 26,300.00
27 Pipa PVC Ø 3" S-12,5 ( 8 - 10 bar ) m' 53,600.00
28 Pipa PVC / paralon 2 inch btg 50,600.00
29 Pipa PVC / paralon 3 inch btg 75,000.00
30 Pipa Reducer PVC Ø 3"-4" bh 5,800.00
31 Pipa Knee/bend PVC Ø 3" bh 5,800.00
32 Plat baja tebal 5 mm - 20 mm kg 12,650.00
33 Ram kawat harmonika m2 23,200.00
34 Socket besi O 3 " bh 45,000.00
NO URAIAN BAHAN/MATERIAL SAT. HARGA KET
KESEPAKATAN

IV. PABRIKAN / TOKO


1 Alumunium foil m2 9,000.00
2 Alumunium pelapis pintu KM lbr 130,000.00
3 Asbes gelombang 1500 x 1050 x 4 mm lbr 35,000.00
4 Asbes gelombang 1800 x 920 x 4 mm lbr 42,500.00
5 Asbes gelombang 2100 x 1050 x 4 mm lbr 57,000.00
6 Asbes gelombang 2400 x 1050 x 4 mm lbr 65,000.00
7 Asbes gelombang 2700 x 1050 x 4 mm lbr 75,000.00
8 Asbes gelombang 3000 x 1050 x 4 mm lbr 85,000.00
9 Bak mandi keramik volume 0,3 m3 bh 185,000.00
10 Bak mandi fiber 120 L bh 220,000.00
11 Batu apung kg 4,300.00
12 Baut 3/4 " bh 3,000.00
13 Baut 5/8 " bh 3,800.00
14 Baut 1/2 " bh 6,000.00
15 Baut 1/2 " panjang 30 cm bh 8,550.00
16 Baut lawa-lawa bh 9,900.00
17 Beading penurunan ( PC ) gypsum m' 10,000.00
18 Beading horison gypsum m' 10,000.00
19 Cat Menie kg 20,000.00
20 Cat genteng kg 48,000.00
21 Cat penutup kayu kg 49,000.00
22 Cat penutup tembok kg 23,000.00
23 Cat penutup besi kg 45,000.00
24 Cat Sinkromat kg 80,000.00
25 Closet duduk ( mono block ) porselen merk INA bh 1,237,000.00
26 Closet duduk ( siram ) porselen merk INA bh 545,000.00
27 Closet jongkok porselen merk INA/KIA bh 140,000.00
28 Dempul kayu kg 18,000.00
29 Dinding keramik uk. 10 x 20 cm bh 950.00
30 Dinding keramik uk. 20 x 20 cm bh 1,850.00
31 Dinding keramik uk. 20 x 25 cm bh 2,200.00
32 Dinding keramik uk. 30 x 30 cm bh 3,300.00
33 Door closer bh 158,125.00
34 Daun pintu alumunium lengkap warna natural/coklat dop bh 900,000.00
35 Daun pintu alumunium lengkap warna coklat kilap bh 1,300,000.00
36 Daun jendela alumunium lengkap warna natural/coklat dop bh 350,000.00
37 Daun jendela alumunium lengkap warna coklat kilap bh 400,000.00
38 Elastomer 30x30x5 bh 550,000.00
39 Engsel jendela set 12,000.00
40 Engsel pintu set 15,000.00
41 Engsel meubeler bh 3,800.00
42 Eternit tebal 4 mm uk. 1 m x 1 m lbr 6,800.00
43 Eternit tebal 4 mm uk. 1 m x 0,5 m lbr 3,400.00
44 Flincote ltr 22,000.00
45 Glass beat kg 20,000.00
46 Glass Block bh 17,500.00
47 Gas elpiji kg 8,800.00
48 Grendel pintu / jendela bh 5,500.00
49 Gypsum board lbr 50,000.00
50 GRC tebal 4 mm lbr 53,000.00
51 Hampelas lbr 4,000.00
52 Kaca nako tebal 5 mm berikut teralis bh 11,400.00
53 Kaca polos tebal 3 mm m2 63,250.00
54 Kaca polos tebal 5 mm m2 75,000.00
55 Kait angin bh 9,500.00
56 Kunci gembok bh 17,000.00
57 Kunci pintu ukuran besar bh 125,000.00
58 Kunci pintu ukuran sedang bh 85,000.00
59 Kunci dan daun pintu dari fiber bh 350,000.00
60 Kusen Alumunium 3" warna natural m' 55,000.00
61 Kusen Alumunium 3" warna coklat dop m' 60,000.00
62 Kusen Alumunium 3" warna coklat kilap m' 75,000.00
63 Kusen Alumunium 4" warna natural m' 60,000.00
64 Kusen Alumunium 4" warna coklat dop m' 65,000.00
65 Kusen Alumunium 4" warna coklat kilap m' 85,000.00
66 Langko - langko kuda - kuda bh 18,000.00
67 Lantai granit 40 x 40 cm ex. Essenza bh 43,500.00
68 Lantai granit 40 x 40 cm ex. Granito bh 42,000.00
69 Lantai granit 60 x 60 cm ex. Granito bh 46,800.00
70 Lantai keramik uk. 10 x 20 cm bh 950.00
71 Lantai keramik uk. 20 x 20 cm bh 1,650.00
72 Lantai keramik uk. 30 x 30 cm bh 3,650.00
73 Lantai keramik uk. 40 x 40 cm ( putih polos ) bh 6,900.00
74 Lantai terakota 20 x 5 cm bh 4,400.00
NO URAIAN BAHAN/MATERIAL SAT. HARGA KET
KESEPAKATAN
75 Lem kayu ltr 30,000.00
76 Lemkra/zat addictive kg 15,000.00
77 Lemkra Just Do It kg 4,500.00
78 Lemkra FS Nat kg 15,850.00
79 List kayu B.3 ( lebar sisi 3 cm ) m' 4,400.00
80 List kayu B.4 ( lebar sisi 4 cm ) m' 4,800.00
81 List keliling gypsum lebar 7 cm m' 6,250.00
82 List keliling gypsum lebar 10 cm m' 7,250.00
83 List keliling gypsum lebar 12 cm m' 8,750.00
84 List drop m' 8,900.00
85 Melamin / folywood lbr 88,500.00
86 Mozaik uk. 20 x 20 cm bh 1,900.00
87 Multiplex tebal 15 mm m2 272,000.00
88 Paku biasa 1/2" - 1" kg 15,000.00
89 Paku biasa 2" - 5" kg 12,500.00
90 Paku pancing 60 x 230 bh 825.00
91 Paku sekrup 3" - 5 " bh 400.00
92 Paku ulir bh 150.00
93 Plamir kayu / kualitas 1 kg 17,500.00
94 Plamir tembok kg 25,000.00
95 Plester Mutiara kg 8,700.00
96 Polycarbonate m2 115,000.00
97 Plywood lbr 92,250.00
98 Portland Cement ( PC ) zak 61,000.00
99 Rubber joint 25x10x5 bh 175,000.00
100 Roster / batu kerawang bh 2,600.00
101 Semen portland kg 1,220.00
102 Semen warna kg 11,000.00
103 Seng BJLS 30 L. 90 cm m2 32,500.00
104 Seng gelombang 3' - 6 " BJLS 30 lbr 42,000.00
105 Sirlak kg 19,500.00
106 Spirtus ltr 11,000.00
107 Skim Coat kg 4,400.00
108 Taekwood 4 mm 1200 x 2400 mm lbr 90,000.00
109 Taekwood 4 mm 900 x 2400 mm lbr 75,000.00
110 Ter kayu kg 14,500.00
111 Thermoplastic Glass beat kg 23,000.00
112 Tiner / minyak cat ltr 9,200.00
113 Triplek 3 mm lbr 45,000.00
114 Triplek 4 mm lbr 55,000.00
115 Triplek 6 mm lbr 75,000.00
116 Triplek 9 mm lbr 95,000.00
117 Triplek 12 mm lbr 200,000.00
118 TG 302 kg 46,500.00
119 Ubin abu2 kepala basah 20 x 20 cm bh 2,000.00
120 Ubin abu2 kepala basah 30 x 30 cm bh 2,500.00
121 Ubin wafel ukuran 20 x 20 cm bh 2,000.00
122 Ubin warna 20 x 20 cm bh 2,300.00
123 Ubin warna 30 x 30 cm bh 2,900.00
124 Washtafel bh 686,000.00
125 Woodplank bh 59,500.00
126 Zincalume m2 70,000.00
127 Rangka plafon memakai Hollow dengan penutup GRC tebal 4 mm + pengecatan m2 88,200.00
128 Rangka atap baja ringan
a. Atap Baja Ringan memakai Genteng Keramik/Plentong ( jarak reng 22-28 cm)
- Atap Baja Ringan Pelana Bentang < 9 m Zinc-Alumunium G.550 m2 165,000.00
- Atap Baja Ringan Perisai Bentang < 9 m Zinc-Alumunium G.550 m2 175,000.00
- Atap Baja Ringan Joglo Bentang < 9 m Zinc-Alumunium G.550 m2 185,000.00
- Atap Baja Ringan Pelana Bentang 10-12 m Zinc-Alumunium G.550 m2 175,000.00
- Atap Baja Ringan Perisai Bentang 10-12 m Zinc-Alumunium G.550 m2 190,000.00
- Atap Baja Ringan Joglo Bentang 10-12 m Zinc-Alumunium G.550 m2 200,000.00
- Atap Baja Ringan Pelana Bentang > 12 m Zinc-Alumunium G.550 m2 190,000.00
- Atap Baja Ringan Perisai Bentang > 12 m Zinc-Alumunium G.550 m2 200,000.00
- Atap Baja Ringan Joglo Bentang > 12 m Zinc-Alumunium G.550 m2 210,000.00
b. Atap Baja Ringan Genteng Metal/Spandek ( jarak reng 37,5-90 cm)
- Atap Baja Ringan Pelana Bentang < 9 m Zinc-Alumunium G.550 m2 155,000.00
- Atap Baja Ringan Perisai Bentang < 9 m Zinc-Alumunium G.550 m2 162,500.00
- Atap Baja Ringan Joglo Bentang < 9 m Zinc-Alumunium G.550 m2 170,000.00
- Atap Baja Ringan Pelana Bentang 10-12 m Zinc-Alumunium G.550 m2 160,000.00
- Atap Baja Ringan Perisai Bentang 10-12 m Zinc-Alumunium G.550 m2 175,000.00
- Atap Baja Ringan Joglo Bentang 10-12 m Zinc-Alumunium G.550 m2 185,000.00
- Atap Baja Ringan Pelana Bentang > 12 m Zinc-Alumunium G.550 m2 170,000.00
- Atap Baja Ringan Perisai Bentang > 12 m Zinc-Alumunium G.550 m2 180,000.00
- Atap Baja Ringan Joglo Bentang > 12 m Zinc-Alumunium G.550 m2 190,000.00
NO URAIAN BAHAN/MATERIAL SAT. HARGA KET
KESEPAKATAN
129 Pintu Air Sorong
- Pintu Air Sorong Baja B = 0.40-0.60 ( 1 drat stang tanpa roda gigi ) Unit 8,497,000.00
- Pintu Air Sorong Baja B = 0.70-0.80 ( 1 drat stang tanpa roda gigi ) Unit 9,639,000.00
- Pintu Air Sorong Baja B = 0.90-1.00 ( 1 drat stang tanpa roda gigi ) Unit 13,500,000.00
- Pintu Air Sorong Baja B = 0.70-1.00 ( 1 drat stang + roda gigi ) Unit 11,414,000.00
- Pintu Air Sorong Baja B = 1.00-1.10 ( 2 drat stang + roda gigi ) Unit 25,366,000.00
- Pintu Air Sorong Baja B = 1.50-1.80 ( 2 drat stang + roda gigi ) Unit 38,049,000.00
- Pintu Air Sorong Baja B = 2.00-2.50 ( 2 drat stang + roda gigi ) Unit 50,732,000.00
130 Gigi Payung / Jantung Besar bh 1,250,000.00
131 Gigi Payung / Jantung Sedang bh 1,100,000.00
132 Gigi Piring Besar bh 2,930,000.00
133 Gigi Piring Sedang bh 1,903,000.00
134 Blok Laher bh 1,750,000.00
135 Bron mur drat 5 " bh 3,250,000.00
136 Bron mur drat 3 " bh 2,150,000.00
137 Drat stang 2" x 100 bh 2,500,000.00
138 Drat stang 3/4" x 100 bh 1,750,000.00
139 Drat stang 1,5" x 100 bh 1,550,000.00
140 Dudukan as horisontal bh 1,850,000.00
141 As Horisontal bh 1,850,000.00
142 Karet sel 8 x 3 cm bh 1,500,000.00
143 As Pemutar bh 750,000.00
144 Laher/Bearing bh 350,000.00
145 Engkel Kemudi Sedang bh 450,000.00
146 Daun Pintu B.50, H.50 bh 1,000,000.00
147 Pintu Klep B=0,5 m unit 1,750,000.00
148 Pintu Klep B=1,0 m unit 3,000,000.00
149 Pintu Klep B=1,5 m unit 4,500,000.00

V. ASPAL
1 Aspal kemasan kg 10,785.00
2 Aspal curah kg 9,930.00

VI. MINYAK
1 Premium liter 4,500.00
2 Premium (non subsidi) liter 9,950.00
3 Solar liter 4,500.00
4 Solar (non subsidi) liter 8,500.00
5 Minyak tanah liter 9,000.00
6 Olie SAE 20, 40, 60, 80 dan 120 liter 35,000.00
7 Pelumas bekisting liter 10,000.00
8 Stempet kg 25,000.00

VII.CETAKAN
1 Bata merah bh 600.00
2 Bata berongga bh 2,250.00
3 Genteng glazuur turbo ex Jatiwangi bh 2,500.00
4 Genteng nok/bubung diglazuur ex Jatiwangi bh 3,500.00
5 Genteng nok/bubung press mesin ex Jatiwangi bh 2,200.00
6 Genteng nok/bubung press tangan ex Jatiwangi bh 2,000.00
7 Genteng nok/bubung morando diglazuur bh 4,500.00
8 Genteng nok/bubung morando bh 4,000.00
9 Genteng press diglazuur ex Jatiwangi bh 2,000.00
10 Genteng press mesin ex Jatiwangi bh 1,900.00
11 Genteng press tangan ex Jatiwangi bh 1,400.00
12 Genteng Type Viktoria bh 9,000.00
13 Genteng nok/bubung Type Viktoria bh 12,500.00
14 Genteng nok/bubung ujung Type Viktoria bh 20,000.00
15 Genteng nok/bubung ujung pertigaan Type Viktoria bh 25,000.00
16 Genteng beton bh 5,000.00
17 Genteng metal m2 75,000.00
18 Gorong-gorong buis beton dia. 100 cm bh/0,5 m' 120,000.00
19 Gorong-gorong buis beton dia. 80 cm bh/0,5 m' 100,000.00
20 Gorong-gorong buis beton dia. 60 cm bh/m' 70,000.00
21 Gorong-gorong buis beton dia. 40 cm bh/m' 60,000.00
22 Gorong-gorong buis beton dia. 30 cm bh/m' 50,000.00
23 Gorong-gorong buis beton dia. 20 cm bh/m' 40,000.00
24 Gravel dia. 60 cm bh 38,000.00
25 Gravel dia. 40 cm bh 35,000.00
26 Gravel dia. 20 cm bh 20,000.00
27 Nok steel gelombang 1050 x 5 mm m' 23,000.00
28 Nok steel gelombang 920 x 5 mm m' 22,500.00
29 Nok / bubung genteng beton bh 6,000.00
30 Paving Block K.175 Segi Enam bh 1,500.00
31 Paving Block K.175 Persegi bh 2,000.00
32 Paving Block K.125 Segi Enam bh 1,250.00
NO URAIAN BAHAN/MATERIAL SAT. HARGA KET
KESEPAKATAN
33 Paving Block K.125 Persegi bh 1,600.00
34 Digital printing m2 25,000.00
NO URAIAN BAHAN/MATERIAL SAT. HARGA KET
KESEPAKATAN
VIII. KAYU
1 Bambu Ø6 - Ø8 / 6 m btg 14,000.00
2 Kayu deplank 8/20 - 4 m (Jati Jateng) m3 8,000,000.00
3 Kayu deplank 8/20 - 4 m (Balau) m3 7,500,000.00
4 Kayu deplank 8/20 - 4 m (Borneo) m3 4,500,000.00
5 Kayu dolken O 8 - 10 /4 m btg 57,000.00
6 Kayu dolken O 12 - 15 /4 m btg 60,000.00
7 Kayu dolken O 5 /3 m btg 35,000.00
8 Kayu hutan/kayu perancah acuan m3 4,255,000.00
9 Kayu kamper m3 8,200,000.00
10 Kayu kaso 5/7 meranti m3 5,000,000.00
11 Kayu kaso 5/7 meranti btg 79,000.00
12 Kayu kruing m3 7,274,000.00
13 Kayu lanan m3 6,546,000.00
14 Kayu meranti m3 5,000,000.00
15 Kayu jati Jabar m3 7,500,000.00
16 Kayu Balau m3 7,500,000.00
17 Kayu Borneo m3 4,500,000.00
18 Kayu bakar m3 90,000.00
19 Reng kayu borneo ukuran 2/3 cm btg 54,000.00
20 Tali Ijuk kg 9,000.00

B. UPAH
1 Mandor /hari 70,000.00
2 Kepala tukang /hari 65,000.00
3 Tukang kayu / besi /hari 60,000.00
4 Tukang batu /hari 60,000.00
5 Pembantu tukang /hari 50,000.00
6 Operator terlatih /hari 60,000.00
7 Operator kurang terlatih /hari 55,000.00
8 Pembantu operator /hari 50,000.00
9 Supir truk /hari 55,000.00
10 Pembantu supir /hari 50,000.00
11 Buruh lapangan terlatih /hari 55,000.00
12 Buruh lapangan kurang terlatih /hari 50,000.00
13 Buruh lapangan tak terlatih / pekerja /hari 50,000.00

DINAS BINA MARGA DINAS PENGELOLAAN SUMBER DAYA AIR


KABUPATEN CIREBON DINAS CIPTA KARYA DAN TATA RUANG DAN PERTAMBANGAN KAB.CIREBON
KABUPATEN CIREBON Kepala Seksi Perencanaan Teknik
Kepala Seksi Desain Teknik
Jalan dan Jembatan Kepala Seksi Bangunan Gedung

SUPARMAN,S.Sos, ST Ir. DAWUD


NIP. 19721230 199901 1 001 YEDI ADHI PRIATNA, BAE, S.Sos NIP. 19640525 199303 1 007
NIP. 19660815 199803 1 004
Kepala Bidang Bina Teknik Kepala Bidang Bina Teknik
Kepala Bidang Bangunan Gedung, Perumahan dan
Permukiman

RACHMAT S, BE AGUNG GUMILANG, SS., M.si


NIP. 19571008 198709 1 001 Ir. FELLYANTO TAMZIL, MM NIP. 19711224 199803 1 004
NIP. 19620428 199003 1 006
Kepala Dinas Bina Marga Kepala Dinas Pengelolaan Sumber Daya Air
Kabupaten Cirebon Kepala Dinas Cipta Karya dan Tata Ruang dan Pertambangan Kabupaten Cirebon
Kabupaten Cirebon

Ir. AVIP SUHERDIAN, MT DEDI NURUL SUDJUDI A


NIP. 19640827 199303 1 006 NIP. 19590721 198303 1 009
Ir. H. ARIEF BUDI PRAYITNO
NIP. 19620428 199003 1 006
DAFTAR KESEPAKATAN HARGA SATUAN BAHAN / MATERIAL DAN UPAH
DINAS BINA MARGA, DINAS PENGELOLAAN SUMBER DAYA AIR & PERTAMBANGAN
DAN DINAS CIPTA KARYA & TATA RUANG
KABUPATEN CIREBON
TAHUN ANGGARAN 2014

NO URAIAN BAHAN/MATERIAL SAT. HARGA KET


KESEPAKATAN
A. BAHAN :
I. BATU
1 Abu Batu m3 172,500.00
2 Agregat kasar m3 203,000.00
3 Agregat halus m3 203,000.00
4 Atras ( tanah urug ) m3 125,000.00
5 Base course A m3 175,000.00
6 Base course B m3 165,800.00
7 Batu apung kg 4,300.00
8 Batu belah 10/15 cm m3 153,000.00
9 Batu belah 15/20 cm m3 153,000.00
10 Batu pecah mesin 0.5-1 cm m3 180,000.00
11 Batu pecah mesin 1-2 cm m3 180,000.00
12 Batu pecah mesin 2-3 cm m3 190,000.00
13 Batu tempel Palimanan 10 X 20 bh 1,500.00
14 Batu tempel kapur tekstur tidak rata bh 2,000.00
15 Chipping m3 203,000.00
16 Filler kg 90.00
17 Kapur bakar m3 70,000.00
18 Kapur Sirih kg 2,000.00
19 Kerikil m3 65,000.00

II. PASIR
1 Pasir beton m3 178,000.00
2 Pasir aspal m3 150,000.00
3 Pasir pasang m3 145,000.00
4 Pasir urug m3 140,000.00
5 Sirtu m3 140,000.00
6 Sirtu tersaring m3 145,000.00
7 Tanah urug pilhan m3 125,000.00
8 Tanah urug biasa m3 100,000.00
III. BESI / PIPA / KAWAT
1 Besi WF/Besi Profil kg 12,500.00
2 Besi strip kg 12,500.00
3 Besi beton kg 11,000.00
4 Besi stainless dia. 0,5" m' 38,000.00
5 Besi stainless dia. 1" m' 60,000.00
6 Besi stainless dia. 1,5" m' 75,000.00
7 Besi stainless dia. 2" m' 80,000.00
8 Besi stainless dia. 2,5" m' 125,000.00
9 Besi stainless dia. 3" m' 152,000.00
10 Besi galvanis dia. 0.5" m' 25,000.00
11 Besi galvanis dia. 1" m' 27,000.00
12 Besi galvanis dia. 1.5" m' 45,000.00
13 Besi galvanis dia. 2" m' 57,000.00
14 Besi galvanis dia. 2.5" m' 80,500.00
15 Besi galvanis dia. 3" m' 96,000.00
16 Besi biasa dia. 2" btg 250,000.00
17 Besi biasa dia. 3" btg 310,000.00
18 Dop besi Ø 3 " bh 60,000.00
19 Kawat beton / Kawat tali kg 18,000.00
20 Kawat bronjong dia. 4 mm kg 20,000.00
21 Kawat galvanis dia. 4 mm kg 20,000.00
22 Kawat galvanis dia. 6 mm kg 24,000.00
23 Kawat duri m' 14,000.00
24 Pipa besi galvanis 2" btg 324,000.00
25 Pipa besi galvanis 3" btg/6m' 500,000.00
26 Pipa PVC Ø 2" S-12,5 ( 8 - 10 bar ) m' 26,300.00
27 Pipa PVC Ø 3" S-12,5 ( 8 - 10 bar ) m' 53,600.00
28 Pipa PVC / paralon 2 inch btg 65,000.00
29 Pipa PVC / paralon 3 inch btg 90,000.00
30 Pipa Reducer PVC Ø 3"-4" bh 6,000.00
NO URAIAN BAHAN/MATERIAL SAT. HARGA KET
KESEPAKATAN
31 Pipa Knee/bend PVC Ø 3" bh 6,000.00
32 Plat baja tebal 5 mm - 20 mm kg 12,650.00
33 Ram kawat harmonika m2 23,000.00
34 Socket besi O 3 " bh 45,000.00
35 Toren Penguin 250 lt bh 525,000.00
36 Toren 500 lt bh 860,000.00
37 Toren 1000 lt bh 1,450,000.00

IV. PABRIKAN / TOKO


1 Alumunium foil m2 9,000.00
2 Alumunium pelapis pintu KM Tebal 0.2 lbr 35,000.00
3 Alumunium pelapis pintu KM Tebal 0.3 lbr 50,000.00
4 Alumunium pelapis pintu KM Tebal 0.4 lbr 70,000.00
5 Asbes gelombang 1500 x 1050 x 4 mm lbr 42,500.00
6 Asbes gelombang 1800 x 920 x 4 mm lbr 32,000.00
7 Asbes gelombang 2100 x 1050 x 4 mm lbr 57,000.00
8 Asbes gelombang 2400 x 1050 x 4 mm lbr 65,000.00
9 Asbes gelombang 2700 x 1050 x 4 mm lbr 75,000.00
10 Asbes gelombang 3000 x 1050 x 4 mm lbr 85,000.00
11 Ampelas lbr 3,000.00
12 Bak mandi keramik volume 0,3 m3 bh 185,000.00
13 Bak mandi fiber 120 L bh 220,000.00
14 Batu apung kg 4,300.00
15 Baut 3/4 " bh 8,500.00
16 Baut 5/8 " bh 3,800.00
17 Baut 1/2 " bh 6,000.00
18 Baut 1/2 " panjang 30 cm bh 8,550.00
19 Beading penurunan ( PC ) gypsum m' 10,000.00
20 Beading horison gypsum m' 10,000.00
21 Cat Menie kg 20,000.00
22 Cat genteng Matex kg 48,000.00
23 Cat genteng maxilite kg 50,000.00
24 Cat penutup kayu Bee brand kg 49,000.00
25 Cat penutup kayu Vim kg 25,000.00
26 Cat penutup kayu Ftalit kg 46,000.00
27 Cat penutup kayu Avian kg 48,000.00
28 Cat penutup tembok Vinilex kg 23,000.00
29 Cat penutup tembok Metrolit kg 23,000.00
30 Cat penutup tembok catylac kg 18,600.00
31 Cat penutup tembok Q Luc kg 10,000.00
32 Cat penutup tembok Property kg 9,500.00
33 Cat penutup besi kg 45,000.00
34 Cat Sinkromat kg 80,000.00
35 Closet duduk ( mono block ) porselen merk INA bh 1,237,000.00
36 Closet duduk ( siram ) porselen merk INA bh 545,000.00
37 Closet jongkok porselen merk INA/KIA bh 140,000.00
38 Closet jongkok porselen merk Avena bh 100,000.00
39 Dempul kayu kg 18,500.00
40 Dinding keramik uk. 10 x 20 cm bh 1,000.00
41 Dinding keramik uk. 20 x 20 cm bh 2,000.00
42 Dinding keramik uk. 20 x 25 cm bh 2,200.00
43 Dinding keramik uk. 30 x 30 cm bh 4,500.00
44 Door closer bh 160,000.00
45 Daun pintu alumunium lengkap warna natural/coklat dop bh 900,000.00
46 Daun pintu alumunium lengkap warna coklat kilap bh 1,300,000.00
47 Daun jendela alumunium lengkap warna natural/coklat dop bh 350,000.00
48 Daun jendela alumunium lengkap warna coklat kilap bh 400,000.00
49 Elastomer 30x30x5 bh 550,000.00
50 Engsel jendela set 12,000.00
51 Engsel pintu set 19,000.00
52 Engsel meubeler bh 3,800.00
53 Eternit tebal 4 mm uk. 1 m x 1 m lbr 6,900.00
54 Eternit tebal 4 mm uk. 1 m x 0,5 m lbr 3,450.00
55 Flincote ltr 22,000.00
56 Loster Jati bh 25,000.00
57 Glass beat kg 20,000.00
58 Glass Block bh 17,500.00
59 Gas elpiji kg 8,800.00
60 Grendel pintu / jendela bh 5,500.00
61 Gypsum board lbr 52,500.00
62 GRC tebal 4 mm lbr 52,500.00
63 Fiber Gelombang 180 x80 lbr 40,000.00
64 Kaca nako tebal 5 mm berikut teralis bh 11,400.00
65 Kaca polos tebal 3 mm m2 63,250.00
66 Kaca polos tebal 5 mm m2 75,000.00
67 Kaca polos tebal 5 mm ryben m2 80,000.00
68 Kait angin bh 7,500.00
69 Kran air Onda bh 12,000.00
70 Kunci gembok bh 20,000.00
NO URAIAN BAHAN/MATERIAL SAT. HARGA KET
KESEPAKATAN
71 Kunci pintu ukuran besar bh 125,000.00
72 Kunci pintu ukuran sedang bh 85,000.00
73 Kunci dan daun pintu dari fiber bh 350,000.00
74 Kusen Alumunium 3" warna natural m' 60,000.00
75 Kusen Alumunium 3" warna coklat dop m' 65,000.00
76 Kusen Alumunium 3" warna coklat kilap m' 70,000.00
77 Kusen Alumunium 4" warna natural m' 65,000.00
78 Kusen Alumunium 4" warna coklat dop m' 70,000.00
79 Kusen Alumunium 4" warna coklat kilap m' 75,000.00
80 Kusen Alumunium 3" YKK m' 100,000.00
81 Kusen Alumunium 4" YKK m' 1,300,000.00
82 Langko - langko kuda - kuda bh 18,000.00
83 Lantai granit 60 x 60 cm ex. Granito corak bh 57,600.00
84 Lantai granit 60 x 60 cm ex. Granito polos bh 84,600.00
85 Lantai granit 40 x 40 cm ex. Essenza bh 43,500.00
86 Lantai granit 40 x 40 cm ex. Granito bh 42,000.00
87 Lantai granit 60 x 60 cm ex. Granito bh 46,800.00
88 Lantai keramik uk. 10 x 20 cm bh 1,000.00
89 Lantai keramik uk. 20 x 20 cm bh 2,000.00
90 Lantai keramik uk. 30 x 30 cm bh 2,200.00
91 Lantai keramik uk. 40 x 40 cm ( putih polos ) bh 4,500.00
92 Lantai terakota 20 x 5 cm bh 4,400.00
93 Lem kayu ltr 30,000.00
94 Lemkra/zat addictive kg 15,000.00
95 Lemkra Just Do It kg 4,500.00
96 Lemkra FS Nat kg 15,850.00
97 List kayu B.3 ( lebar sisi 3 cm ) m' 4,400.00
98 List kayu B.4 ( lebar sisi 4 cm ) m' 4,800.00
99 List keliling gypsum lebar 7 cm m' 14,000.00
100 List keliling gypsum lebar 10 cm m' 16,000.00
101 List keliling gypsum lebar 12 cm m' 18,000.00
102 List drop m' 8,900.00
103 Melamin / folywood lbr 88,500.00
104 Mozaik uk. 20 x 20 cm bh 1,900.00
105 Multiplex tebal 12 mm lbr 175,000.00
106 Multiplex tebal 15 mm lbr 275,000.00
107 Paku biasa 1/2" - 1" kg 16,000.00
108 Paku biasa 2" - 5" kg 13,000.00
109 Paku pancing 60 x 230 bh 825.00
110 Paku sekrup 3" - 5 " bh 400.00
111 Paku ulir bh 150.00
112 Plamir kayu / kualitas 1 kg 18,500.00
113 Plamir tembok kg 20,000.00
114 Plester Mutiara kg 8,000.00
115 Pintu kamer mandi fiber polos Daimaru bh 175,000.00
116 Pintu kamer mandi fiber Kaca Daimaru bh 245,000.00
117 Pintu kamer mandi Almunium Kettler bh 700,000.00
118 Polycarbonate m2 115,000.00
119 Plywood lbr 92,250.00
120 Portland Cement ( PC ) tiga roda zak 63,000.00
121 Portland Cement ( PC ) holcim zak 62,500.00
122 Portland Cement ( PC ) gresik zak 61,000.00
123 Rubber joint 25x10x5 bh 175,000.00
124 Roster / batu kerawang bh 4,000.00
125 Semen portland kg 1,260.00
126 Semen warna kg 6,000.00
127 Seng BJLS 30 L. 90 cm m2 38,000.00
128 Seng gelombang 3' - 6 " BJLS 30 lbr 42,000.00
129 Sirlak kg 19,500.00
130 Spirtus ltr 9,000.00
131 Skim Coat kg 4,400.00
132 Taekwood 4 mm 1200 x 2400 mm lbr 80,000.00
133 Taekwood 4 mm 900 x 2400 mm lbr 65,000.00
134 Ter kayu kg 14,500.00
135 Thermoplastic Glass beat kg 23,000.00
136 Tiner / minyak cat ltr 6,000.00
137 Triplek 3 mm lbr 45,000.00
138 Triplek 4 mm lbr 55,000.00
139 Triplek 6 mm lbr 75,000.00
140 Triplek 9 mm lbr 102,500.00
141 Triplek 12 mm lbr 200,000.00
142 Tempat cuci piring Beleza bh 400,000.00
143 Tempat cuci piring Benoti bh 175,000.00
144 Tempat cuci piring Royal bh 160,000.00
145 TG 302 kg 43,600.00
146 Washtafel bh 686,000.00
147 Woodplank corak 4 m lbr 60,000.00
148 Woodplank polos 2 m lbr 32,500.00
NO URAIAN BAHAN/MATERIAL SAT. HARGA KET
KESEPAKATAN
149 Ubin abu2 kepala basah 20 x 20 cm bh 2,000.00
150 Ubin abu2 kepala basah 30 x 30 cm bh 2,500.00
151 Ubin wafel ukuran 20 x 20 cm bh 2,000.00
152 Ubin warna 20 x 20 cm bh 2,300.00
153 Ubin warna 30 x 30 cm bh 2,900.00
154 Washtafel bh 686,000.00
155 Woodplank corak 4 m lbr 60,000.00
156 Woodplank polos 2 m lbr 32,500.00
157 Zincalume m2 75,000.00
158 Rangka plafon memakai Hollow dengan penutup GRC tebal 4 mm + pengec m2 88,200.00
159 Rangka atap baja ringan
a. Atap Baja Ringan memakai Genteng Keramik/Plentong ( jarak reng 22-28 cm)
- Atap Baja Ringan Pelana Bentang < 9 m Zinc-Alumunium G.550 m2 165,000.00
- Atap Baja Ringan Perisai Bentang < 9 m Zinc-Alumunium G.550 m2 175,000.00
- Atap Baja Ringan Joglo Bentang < 9 m Zinc-Alumunium G.550 m2 185,000.00
- Atap Baja Ringan Pelana Bentang 10-12 m Zinc-Alumunium G.550 m2 175,000.00
- Atap Baja Ringan Perisai Bentang 10-12 m Zinc-Alumunium G.550 m2 190,000.00
- Atap Baja Ringan Joglo Bentang 10-12 m Zinc-Alumunium G.550 m2 200,000.00
- Atap Baja Ringan Pelana Bentang > 12 m Zinc-Alumunium G.550 m2 190,000.00
- Atap Baja Ringan Perisai Bentang > 12 m Zinc-Alumunium G.550 m2 200,000.00
- Atap Baja Ringan Joglo Bentang > 12 m Zinc-Alumunium G.550 m2 210,000.00
b. Atap Baja Ringan Genteng Metal/Spandek ( jarak reng 37,5-90 cm)
- Atap Baja Ringan Pelana Bentang < 9 m Zinc-Alumunium G.550 m2 155,000.00
- Atap Baja Ringan Perisai Bentang < 9 m Zinc-Alumunium G.550 m2 162,500.00
- Atap Baja Ringan Joglo Bentang < 9 m Zinc-Alumunium G.550 m2 170,000.00
- Atap Baja Ringan Pelana Bentang 10-12 m Zinc-Alumunium G.550 m2 160,000.00
- Atap Baja Ringan Perisai Bentang 10-12 m Zinc-Alumunium G.550 m2 175,000.00
- Atap Baja Ringan Joglo Bentang 10-12 m Zinc-Alumunium G.550 m2 185,000.00
- Atap Baja Ringan Pelana Bentang > 12 m Zinc-Alumunium G.550 m2 170,000.00
- Atap Baja Ringan Perisai Bentang > 12 m Zinc-Alumunium G.550 m2 180,000.00
- Atap Baja Ringan Joglo Bentang > 12 m Zinc-Alumunium G.550 m2 190,000.00

160 Pintu Air Sorong


- Pintu Air Sorong Baja B = 0.40-0.60 ( 1 drat stang tanpa roda gigi ) Unit 8,497,000.00
- Pintu Air Sorong Baja B = 0.70-0.80 ( 1 drat stang tanpa roda gigi ) Unit 9,639,000.00
- Pintu Air Sorong Baja B = 0.90-1.00 ( 1 drat stang tanpa roda gigi ) Unit 13,500,000.00
- Pintu Air Sorong Baja B = 0.70-1.00 ( 1 drat stang + roda gigi ) Unit 11,414,000.00
- Pintu Air Sorong Baja B = 1.00-1.10 ( 2 drat stang + roda gigi ) Unit 25,366,000.00
- Pintu Air Sorong Baja B = 1.50-1.80 ( 2 drat stang + roda gigi ) Unit 38,049,000.00
- Pintu Air Sorong Baja B = 2.00-2.50 ( 2 drat stang + roda gigi ) Unit 50,732,000.00
161 Gigi Payung / Jantung Besar bh 1,250,000.00
162 Gigi Payung / Jantung Sedang bh 1,100,000.00
163 Gigi Piring Besar bh 2,930,000.00
164 Gigi Piring Sedang bh 1,903,000.00
165 Blok Laher bh 1,750,000.00
166 Bron mur drat 5 " bh 3,250,000.00
167 Bron mur drat 3 " bh 2,150,000.00
168 Drat stang 2" x 100 bh 2,500,000.00
169 Drat stang 3/4" x 100 bh 1,750,000.00
170 Drat stang 1,5" x 100 bh 1,550,000.00
171 Dudukan as horisontal bh 1,850,000.00
172 As Horisontal bh 1,850,000.00
173 Karet sel 8 x 3 cm bh 1,500,000.00
174 As Pemutar bh 750,000.00
175 Laher/Bearing bh 350,000.00
176 Engkel Kemudi Sedang bh 450,000.00
177 Daun Pintu B.50, H.50 bh 1,000,000.00
178 Pintu Klep B=0,5 m unit 1,750,000.00
179 Pintu Klep B=1,0 m unit 3,000,000.00
180 Pintu Klep B=1,5 m unit 4,500,000.00

V. ASPAL
1 Aspal kemasan kg 11,300.00
2 Aspal curah kg 11,100.00

VI. MINYAK
1 Premium liter 6,500.00
2 Premium (non subsidi) liter 9,600.00
3 Solar liter 6,500.00
4 Solar (non subsidi) liter 10,400.00
5 Minyak tanah liter 10,300.00
6 Olie SAE 20, 40, 60, 80 dan 120 liter 35,000.00
7 Pelumas bekisting liter 10,000.00
8 Stempet kg 25,000.00
NO URAIAN BAHAN/MATERIAL SAT. HARGA KET
KESEPAKATAN
VII.CETAKAN
1 Bata merah bh 650.00
2 Bata berongga bh 2,400.00
3 Batako bh 3,200.00
4 Genteng glazuur turbo ex Jatiwangi bh 2,500.00
5 Genteng nok/bubung diglazuur ex Jatiwangi bh 3,500.00
6 Genteng nok/bubung press mesin ex Jatiwangi bh 2,200.00
7 Genteng nok/bubung press tangan ex Jatiwangi bh 2,000.00
8 Genteng nok/bubung morando diglazuur bh 4,500.00
9 Genteng morando bh 3,500.00
10 Genteng nok/bubung morando bh 4,000.00
11 Genteng press diglazuur ex Jatiwangi bh 2,500.00
12 Genteng press mesin ex Jatiwangi bh 1,900.00
13 Genteng press tangan ex Jatiwangi bh 1,400.00
14 Genteng Type Viktoria bh 9,000.00
15 Genteng nok/bubung Type Viktoria bh 12,500.00
16 Genteng nok/bubung ujung Type Viktoria bh 20,000.00
17 Genteng nok/bubung ujung pertigaan Type Viktoria bh 25,000.00
18 Genteng beton bh 5,000.00
19 Genteng metal 70 x 80 cm lbr 48,000.00
20 Gorong-gorong buis beton dia. 100 cm bh/0,5 m' 120,000.00
21 Gorong-gorong buis beton dia. 80 cm bh/0,5 m' 100,000.00
22 Gorong-gorong buis beton dia. 60 cm bh/m' 80,000.00
23 Gorong-gorong buis beton dia. 40 cm bh/m' 60,000.00
24 Gorong-gorong buis beton dia. 30 cm bh/m' 50,000.00
25 Gorong-gorong buis beton dia. 20 cm bh/m' 40,000.00
26 Gravel dia. 60 cm bh 40,000.00
27 Gravel dia. 40 cm bh 35,000.00
28 Gravel dia. 20 cm bh 25,000.00
29 Nok steel gelombang 1050 x 5 mm m' 29,000.00
30 Nok steel gelombang 920 x 5 mm m' 22,500.00
31 Nok / bubung genteng beton bh 6,000.00
32 Paving Block K.175 Segi Enam Netural tebal 8 cm m2 62,000.00
33 Paving Block K.175 Segi Enam motif tebal 8 cm m2 64,000.00
34 Paving Block K.175 Segi Enam warna tebal 8 cm m2 69,000.00
35 Paving Block K.175 Segi Enam Netural tebal 7 cm m2 55,000.00
36 Paving Block K.175 Segi Enam motif tebal 7 cm m2 58,000.00
37 Paving Block K.175 Segi Enam warna tebal 7 cm m2 64,000.00
38 Paving Block K.175 Segi Enam Netural tebal 6 cm m2 50,000.00
39 Paving Block K.175 Segi Enam motif tebal 6 cm m2 53,000.00
40 Paving Block K.175 Segi Enam warna tebal 6 cm m2 57,000.00
41 Paving Block K.125 Segi Enam Netural tebal 6 cm bh 43,000.00
42 Paving Block K.125 Segi Enam warna tebal 6 cm bh 47,000.00
43 Digital printing m2 25,000.00
VIII. KAYU
1 Bambu Ø6 - Ø8 / 6 m btg 17,000.00
2 Kayu deplank 8/20 - 4 m (Jati Jateng) m3 8,000,000.00
3 Kayu deplank 8/20 - 4 m (Balau) m3 9,500,000.00
4 Kayu deplank 8/20 - 4 m (Borneo) m3 5,000,000.00
5 Kayu dolken O 8 - 10 /4 m btg 60,000.00
6 Kayu dolken O 12 - 15 /4 m btg 68,000.00
7 Kayu dolken O 5 /3 m btg 12,500.00
8 Kayu hutan/kayu perancah acuan m3 4,255,000.00
9 Kayu kamper m3 8,200,000.00
10 Kayu kaso 5/7 meranti m3 6,000,000.00
11 Kayu kaso 5/7 meranti btg 79,000.00
12 Kayu kruing m3 7,274,000.00
13 Kayu lanan m3 6,546,000.00
14 Kayu meranti m3 6,000,000.00
15 Kayu jati Jabar m3 8,200,000.00
16 Kayu Balau m3 9,500,000.00
17 Kayu Borneo m3 5,000,000.00
18 Kayu bakar m3 90,000.00
19 Reng kayu borneo ukuran 2/3 cm btg 54,000.00
20 Tali Ijuk kg 9,000.00
NO URAIAN BAHAN/MATERIAL SAT. HARGA KET
KESEPAKATAN
B. UPAH
1 Mandor /hari 85,000.00
2 Kepala tukang /hari 75,000.00
3 Tukang kayu / besi /hari 70,000.00
4 Tukang batu /hari 70,000.00
5 Pembantu tukang /hari 55,000.00
6 Operator terlatih /hari 100,000.00
7 Operator kurang terlatih /hari 55,000.00
8 Pembantu operator /hari 50,000.00
9 Supir truk /hari 55,000.00
10 Pembantu supir /hari 50,000.00
11 Mekanik /hari 55,000.00
12 Pembantu mekanik /hari 50,000.00
13 Buruh lapangan terlatih /hari 55,000.00
14 Buruh lapangan kurang terlatih /hari 50,000.00
15 Buruh lapangan tak terlatih / pekerja /hari 55,000.00

DINAS BINA MARGA DINAS CIPTA KARYA DAN TATA RUANG DINAS PENGELOLAAN SUMBER DAYA AIR
KABUPATEN CIREBON KABUPATEN CIREBON DAN PERTAMBANGAN KAB.CIREBON
Kepala Seksi Perencanaan Teknik
Kepala Seksi Desain Teknik Kepala Seksi Bangunan Gedung
Jalan dan Jembatan

SUPARMAN,S.Sos, ST YEDI ADHI PRIATNA, BAE, S.Sos Ir. DAWUD


NIP. 19721230 199901 1 001 NIP. 19660815 199803 1 004 NIP. 19640525 199303 1 007

Kepala Bidang Bina Teknik Kepala Bidang Bangunan Gedung, Perumahan dan Kepala Bidang Bina Teknik
Permukiman

RACHMAT S, BE Ir. FELLYANTO TAMZIL, MM AGUNG GUMILANG, SS., M.si


NIP. 19571008 198709 1 001 NIP. 19620428 199003 1 006 NIP. 19711224 199803 1 004

Kepala Dinas Bina Marga Kepala Dinas Cipta Karya dan Tata Ruang Kepala Dinas Pengelolaan Sumber Daya Air
Kabupaten Cirebon Kabupaten Cirebon dan Pertambangan Kabupaten Cirebon

Ir. AVIP SUHERDIAN, MT Ir. H. ARIEF BUDI PRAYITNO DEDI NURUL SUDJUDI A
NIP. 19640827 199303 1 006 NIP. 19620428 199003 1 006 NIP. 19590721 198303 1 009
DAFTAR KESEPAKATAN HARGA SATUAN BAHAN / MATERIAL DAN UPAH
DINAS BINA MARGA, DINAS PENGELOLAAN SUMBER DAYA AIR & PERTAMBANGAN
DAN DINAS CIPTA KARYA & TATA RUANG
KABUPATEN CIREBON
HARGA TERTINGGI TAHUN ANGGARAN 2015

kesimpulan
NO URAIAN BAHAN/MATERIAL SAT. HARGA TERTINGGI 2015 HARGA TERTINGGI 2015 harga survay
HARGA DASAR + 10 % tertinggi
A. BAHAN :
I. BATU
1 Abu Batu m3 185,850.00 204,400.00
2 Atras ( tanah urug ) m3 125,000.00 137,500.00
3 Base course A m3
4 Base course B m3
5 Batu apung kg 4,300.00 4,700.00
6 Batu belah 10/15 cm m3 175,000.00 192,500.00
7 Batu belah 15/20 cm (Krakal) m3 175,000.00 192,500.00
8 Batu pecah mesin 0.5-1 cm m3 200,000.00 220,000.00
9 Batu pecah mesin 1-2 cm m3 200,000.00 220,000.00
10 Batu pecah mesin 2-3 cm m3 200,000.00 220,000.00
11 Batu pecah mesin 3-5 cm 182,000.00 200,200.00
12 Batu tempel Palimanan 10 X 20 bh 1,500.00 1,650.00
13 Batu tempel kapur tekstur tidak rata bh 2,000.00 2,200.00
14 Chipping m3 245,300.00 269,800.00
15 Filler kg 100.00 100.00
16 Kapur bakar m3 70,000.00 77,000.00
17 Kapur Sirih kg 2,000.00 2,200.00
18 Kerikil m3 65,000.00 71,500.00

II. PASIR
1 Pasir beton m3 179,000.00 196,900.00
2 Pasir aspal m3 175,000.00 192,500.00
3 Pasir pasang m3 162,000.00 178,200.00
4 Pasir urug m3 150,000.00 165,000.00
5 Sirtu m3 145,000.00 159,500.00
6 Sirtu tersaring m3 147,000.00 161,700.00
7 Tanah urug pilhan m3 125,000.00 137,500.00
8 Tanah urug biasa m3 100,000.00 110,000.00
Tanah merah m3 112,500.00 123,750.00
III. BESI / PIPA / KAWAT
1 Besi WF/Besi Profil kg 13,750.00 15,125.00
2 Besi strip kg 13,750.00 15,125.00
3 Besi beton kg 13,000.00 14,300.00
4 Besi stainless dia. 0,5" m' 38,000.00 41,800.00
5 Besi stainless dia. 1" m' 60,000.00 66,000.00
6 Besi stainless dia. 1,5" m' 75,000.00 82,500.00
7 Besi stainless dia. 2" m' 80,000.00 88,000.00
8 Besi stainless dia. 2,5" m' 125,000.00 137,500.00
9 Besi stainless dia. 3" m' 152,000.00 167,200.00
10 Besi galvanis dia. 0.5" m' 25,000.00 27,500.00
11 Besi galvanis dia. 1" m' 27,000.00 29,700.00
12 Besi galvanis dia. 1.5" m' 45,000.00 49,500.00
13 Besi galvanis dia. 2" m' 57,000.00 62,700.00
14 Besi galvanis dia. 2.5" m' 80,500.00 88,550.00
15 Besi galvanis dia. 3" m' 84,000.00 92,400.00
16 Besi biasa dia. 2" btg 250,000.00 275,000.00
17 Besi biasa dia. 3" btg 310,000.00 341,000.00
18 Dop besi Ø 3 " bh 60,000.00 66,000.00
19 Kawat beton / Kawat tali kg 18,000.00 19,800.00
20 Kawat bronjong pabrikan dia. 3 mm (uk 2x1x0.5) unit 388,080.00 426,888.00
21 Kawat bronjong dia. 4 mm kg 20,000.00 22,000.00
22 Kawat galvanis dia. 4 mm kg 20,000.00 22,000.00
23 Kawat galvanis dia. 6 mm kg 24,000.00 26,400.00
24 Kawat duri m' 14,000.00 15,400.00
25 Pipa besi galvanis 2" btg/6m' 324,000.00 356,400.00
26 Pipa besi galvanis 3" btg/6m' 500,000.00 550,000.00
27 Pipa PVC Ø 2" S-12,5 ( 8 - 10 bar ) m' 26,300.00 28,900.00
28 Pipa PVC Ø 3" S-12,5 ( 8 - 10 bar ) m' 53,600.00 58,900.00
29 Pipa PVC / paralon 2 inch btg 69,000.00 75,900.00
30 Pipa PVC / paralon 3 inch btg 90,000.00 99,000.00
31 Pipa Reducer PVC Ø 3"-4" bh 6,000.00 6,600.00
kesimpulan
NO URAIAN BAHAN/MATERIAL SAT. HARGA TERTINGGI 2015 HARGA TERTINGGI 2015 harga survay
HARGA DASAR + 10 % tertinggi
32 Pipa Knee/bend PVC Ø 3" bh 6,000.00 6,600.00
33 Plat baja tebal 5 mm - 20 mm kg 13,000.00 14,300.00
34 Ram kawat harmonika m2 25,000.00 27,500.00
35 Socket besi O 3 " bh 45,000.00 49,500.00
36 Toren Penguin 250 lt bh 525,000.00 577,500.00
37 Toren 500 lt bh 860,000.00 946,000.00
38 Toren 1000 lt bh 1,450,000.00 1,595,000.00
39 Sling Ø 32 mm m 300,000.00 330,000.00
40 Sling Ø 16 mm m 175,000.00 192,500.00
41 Klem sling Ø 32 mm set 250,000.00 275,000.00
42 Warfel / jarum keras Ø 32 mm bh 200,000.00 220,000.00
43 Causen sling Ø 32 mm bh 85,000.00 93,500.00
44 Klem kokat sling Ø 32 mm bh 210,000.00 231,000.00
45 Segel sling Ø 32 mm bh 250,000.00 275,000.00
46 Warfel sling Ø 16 mm bh 135,000.00 148,500.00
47 Segel sling Ø 16 mm bh 140,000.00 154,000.00
48 Klem kokat sling Ø 16 mm bh 35,000.00 38,500.00
49 Causen sling Ø 16 mm bh 50,000.00 55,000.00
50 Jarum keras Ø 16 mm bh 75,000.00 82,500.00

IV. PABRIKAN / TOKO


1 Alumunium foil m2 9,000.00 9,900.00
2 Alumunium pelapis pintu KM Tebal 0.2 lbr 35,000.00 38,500.00
3 Alumunium pelapis pintu KM Tebal 0.3 lbr 50,000.00 55,000.00
4 Alumunium pelapis pintu KM Tebal 0.4 lbr 70,000.00 77,000.00
5 Asbes gelombang 1500 x 1050 x 4 mm lbr 42,500.00 46,750.00
6 Asbes gelombang 1800 x 920 x 4 mm lbr 32,000.00 35,200.00
7 Asbes gelombang 2100 x 1050 x 4 mm lbr 57,000.00 62,700.00
8 Asbes gelombang 2400 x 1050 x 4 mm lbr 65,000.00 71,500.00
9 Asbes gelombang 2700 x 1050 x 4 mm lbr 75,000.00 82,500.00
10 Asbes gelombang 3000 x 1050 x 4 mm lbr 85,000.00 93,500.00
11 Ampelas lbr 3,000.00 3,300.00
12 Bak mandi keramik volume 0,3 m3 bh 185,000.00 203,500.00
13 Bak mandi fiber 120 L bh 220,000.00 242,000.00
14 Batu apung kg 4,300.00 4,700.00
15 Baut 3/4 " bh 6,700.00 7,300.00
16 Baut 5/8 " bh 6,700.00 7,300.00
17 Baut 1/2 " bh 6,000.00 6,600.00
18 Baut 1/2 " panjang 30 cm bh 8,550.00 9,400.00
19 Baut lawa-lawa 12 cm 13,000.00 14,300.00
20 Beading penurunan ( PC ) gypsum m' 10,000.00 11,000.00
21 Beading horison gypsum m' 10,000.00 11,000.00
22 Cat Menie kg 25,000.00 27,500.00
23 Cat genteng Matex kg 48,000.00 52,800.00
24 Cat genteng maxilite kg 50,000.00 55,000.00
25 Cat penutup kayu Bee brand kg 49,000.00 53,900.00
26 Cat penutup kayu Vim kg 25,000.00 27,500.00
27 Cat penutup kayu Ftalit kg 46,000.00 50,600.00
28 Cat penutup kayu Avian kg 48,000.00 52,800.00
29 Cat penutup tembok Vinilex kg 25,000.00 27,500.00
30 Cat penutup tembok Metrolit kg 23,000.00 25,300.00
31 Cat penutup tembok catylac kg 18,600.00 20,400.00
32 Cat penutup tembok Q Luc kg 10,000.00 11,000.00
33 Cat penutup tembok Property kg 9,500.00 10,450.00
34 Cat penutup besi kg 52,000.00 57,200.00
35 Cat Sinkromat kg 90,000.00 99,000.00
36 Closet duduk ( mono block ) porselen merk INA bh 1,237,000.00 1,360,700.00
37 Closet duduk ( siram ) porselen merk INA bh 545,000.00 599,500.00
38 Closet jongkok porselen merk INA/KIA bh 140,000.00 154,000.00
39 Closet jongkok porselen merk Avena bh 100,000.00 110,000.00
40 Dempul kayu kg 18,500.00 20,350.00
41 Dinding keramik uk. 10 x 20 cm bh 1,000.00 1,100.00
42 Dinding keramik uk. 20 x 20 cm bh 2,000.00 2,200.00
43 Dinding keramik uk. 20 x 25 cm bh 2,200.00 2,400.00
44 Dinding keramik uk. 30 x 30 cm bh 4,500.00 4,950.00
45 Door closer bh 160,000.00 176,000.00
46 Daun pintu alumunium lengkap warna natural/coklat dop bh 900,000.00 990,000.00
47 Daun pintu alumunium lengkap warna coklat kilap bh 1,300,000.00 1,430,000.00
48 Daun jendela alumunium lengkap warna natural/coklat do bh 350,000.00 385,000.00
49 Daun jendela alumunium lengkap warna coklat kilap bh 400,000.00 440,000.00
50 Elastomer 30x30x5 bh 632,500.00 695,750.00
51 Engsel jendela set 12,000.00 13,200.00
52 Engsel pintu set 19,000.00 20,900.00
53 Engsel meubeler bh 3,800.00 4,200.00
54 Eternit tebal 4 mm uk. 1 m x 1 m lbr 6,900.00 7,600.00
55 Eternit tebal 4 mm uk. 1 m x 0,5 m lbr 3,450.00 3,800.00
56 Flincote ltr 22,000.00 24,200.00
57 Loster Jati bh 25,000.00 27,500.00
58 Glass beat kg 25,000.00 27,500.00
59 Glass Block bh 17,500.00 19,250.00
60 Gas elpiji kg 8,800.00 9,700.00
61 Grendel pintu / jendela bh 5,500.00 6,000.00
62 Gypsum board lbr 52,500.00 57,750.00
63 GRC tebal 4 mm lbr 52,500.00 57,750.00
64 Fiber Gelombang 180 x80 lbr 40,000.00 44,000.00
65 Kaca nako tebal 5 mm berikut teralis bh 11,400.00 12,500.00
66 Kaca polos tebal 3 mm m2 63,250.00 69,575.00
67 Kaca polos tebal 5 mm m2 75,000.00 82,500.00
68 Kaca polos tebal 5 mm ryben m2 80,000.00 88,000.00
69 Kait angin bh 7,500.00 8,250.00
70 Kran air Onda bh 12,000.00 13,200.00
71 Kunci gembok bh 20,000.00 22,000.00
kesimpulan
NO URAIAN BAHAN/MATERIAL SAT. HARGA TERTINGGI 2015 HARGA TERTINGGI 2015 harga survay
HARGA DASAR + 10 % tertinggi
72 Kunci pintu ukuran besar bh 125,000.00 137,500.00
73 Kunci pintu ukuran sedang bh 85,000.00 93,500.00
74 Kunci dan daun pintu dari fiber bh 350,000.00 385,000.00
75 Kusen Alumunium 3" warna natural m' 60,000.00 66,000.00
76 Kusen Alumunium 3" warna coklat dop m' 65,000.00 71,500.00
77 Kusen Alumunium 3" warna coklat kilap m' 70,000.00 77,000.00
78 Kusen Alumunium 4" warna natural m' 65,000.00 71,500.00
79 Kusen Alumunium 4" warna coklat dop m' 70,000.00 77,000.00
80 Kusen Alumunium 4" warna coklat kilap m' 75,000.00 82,500.00
81 Kusen Alumunium 3" YKK m' 100,000.00 110,000.00
82 Kusen Alumunium 4" YKK m' 1,300,000.00 1,430,000.00
83 Langko - langko kuda - kuda bh 18,000.00 19,800.00
84 Lantai granit 60 x 60 cm ex. Granito corak bh 57,600.00 63,400.00
85 Lantai granit 60 x 60 cm ex. Granito polos bh 84,600.00 93,000.00
86 Lantai granit 40 x 40 cm ex. Essenza bh 43,500.00 47,850.00
87 Lantai granit 40 x 40 cm ex. Granito bh 42,000.00 46,200.00
88 Lantai granit 60 x 60 cm ex. Granito bh 46,800.00 51,500.00
89 Lantai keramik uk. 10 x 20 cm bh 1,000.00 1,100.00
90 Lantai keramik uk. 20 x 20 cm bh 2,000.00 2,200.00
91 Lantai keramik uk. 30 x 30 cm bh 2,200.00 2,400.00
92 Lantai keramik uk. 40 x 40 cm ( putih polos ) bh 4,500.00 4,950.00
93 Lantai terakota 20 x 5 cm bh 4,400.00 4,800.00
94 Lem kayu ltr 30,000.00 33,000.00
95 Lemkra/zat addictive kg 15,000.00 16,500.00
96 Lemkra Just Do It kg 4,500.00 4,950.00
97 Lemkra FS Nat kg 15,850.00 17,400.00
98 List kayu B.3 ( lebar sisi 3 cm ) m' 4,400.00 4,800.00
99 List kayu B.4 ( lebar sisi 4 cm ) m' 4,800.00 5,300.00
100 List keliling gypsum lebar 7 cm m' 14,000.00 15,400.00
101 List keliling gypsum lebar 10 cm m' 16,000.00 17,600.00
102 List keliling gypsum lebar 12 cm m' 18,000.00 19,800.00
103 List drop m' 8,900.00 9,800.00
104 Melamin / folywood lbr 88,500.00 97,350.00
105 Mozaik uk. 20 x 20 cm bh 1,900.00 2,100.00
106 Multiplex tebal 12 mm lbr 175,000.00 192,500.00
107 Multiplex tebal 15 mm lbr 275,000.00 302,500.00
108 Paku biasa 1/2" - 1" kg 18,500.00 20,350.00
109 Paku biasa 2" - 5" kg 20,000.00 22,000.00
110 Paku pancing 60 x 230 bh 825.00 900.00
111 Paku sekrup 3" - 5 " bh 400.00 450.00
112 Paku ulir bh 150.00 200.00
113 Plamir kayu / kualitas 1 kg 20,000.00 22,000.00
114 Plamir tembok kg 23,000.00 25,300.00
115 Plester Mutiara kg 8,000.00 8,800.00
116 Pintu kamer mandi fiber polos Daimaru bh 175,000.00 192,500.00
117 Pintu kamer mandi fiber Kaca Daimaru bh 245,000.00 269,500.00
118 Pintu kamer mandi Almunium Kettler bh 700,000.00 770,000.00
119 Polycarbonate m2 115,000.00 126,500.00
120 Plywood lbr 92,250.00 101,475.00
121 Portland Cement ( PC ) tiga roda zak 68,000.00 68,000.00
122 Portland Cement ( PC ) holcim zak 67,000.00 67,000.00
123 Portland Cement ( PC ) gresik zak 66,000.00 66,000.00
124 Rubber joint 25x10x5 bh 192,500.00 211,750.00
125 Joint Sealent kg 42,900.00 47,200.00
126 Expansion Cap m2 7,600.00 8,400.00
127 Polytene 125 mikron kg 27,500.00 30,250.00
128 Curing Compound Ltr 4,400.00 4,850.00
129 Roster / batu kerawang bh 4,000.00 4,400.00
130 Semen portland kg 1,360.00 1,360.00
131 Semen warna kg 6,000.00 6,000.00
132 Seng BJLS 30 L. 90 cm m2 38,000.00 41,800.00
133 Seng gelombang 3' - 6 " BJLS 30 lbr 51,000.00 56,100.00
134 Sirlak kg 19,500.00 21,450.00
135 Spirtus ltr 9,000.00 9,900.00
136 Skim Coat kg 4,400.00 4,850.00
137 Taekwood 4 mm 1200 x 2400 mm lbr 80,000.00 88,000.00
138 Taekwood 4 mm 900 x 2400 mm lbr 65,000.00 71,500.00
139 Ter kayu kg 14,500.00 15,950.00
140 Thermoplastic Glass beat kg 25,000.00 27,500.00
141 Tiner / minyak cat ltr 11,500.00 12,650.00
142 Triplek 3 mm lbr 52,000.00 57,200.00
143 Triplek 4 mm lbr 55,000.00 60,500.00
144 Triplek 6 mm lbr 83,000.00 91,300.00
145 Triplek 9 mm lbr 102,500.00 112,750.00
146 Triplek 12 mm lbr 200,000.00 220,000.00
147 Tempat cuci piring Beleza bh 400,000.00 440,000.00
148 Tempat cuci piring Benoti bh 175,000.00 192,500.00
149 Tempat cuci piring Royal bh 160,000.00 176,000.00
150 TG 302 kg 43,600.00 47,950.00
151 Washtafel bh 686,000.00 754,600.00
152 Woodplank corak 4 m lbr 60,000.00 66,000.00
153 Woodplank polos 2 m lbr 32,500.00 35,750.00
kesimpulan
NO URAIAN BAHAN/MATERIAL SAT. HARGA TERTINGGI 2015 HARGA TERTINGGI 2015 harga survay
HARGA DASAR + 10 % tertinggi
154 Ubin abu2 kepala basah 20 x 20 cm bh 2,000.00 2,200.00
155 Ubin abu2 kepala basah 30 x 30 cm bh 2,500.00 2,750.00
156 Ubin wafel ukuran 20 x 20 cm bh 2,000.00 2,200.00
157 Ubin warna 20 x 20 cm bh 2,300.00 2,550.00
158 Ubin warna 30 x 30 cm bh 2,900.00 3,200.00
159 Washtafel bh 686,000.00 754,600.00
160 Woodplank corak 4 m lbr 60,000.00 66,000.00
161 Woodplank polos 2 m lbr 32,500.00 35,750.00
162 Zincalume m2 75,000.00 82,500.00
163 Rangka plafon memakai Hollow dengan penutup GRC teb m2 88,200.00 97,000.00
164 Rangka atap baja ringan
a. Atap Baja Ringan memakai Genteng Keramik/Plentong ( jarak reng 22-28 cm)
- Atap Baja Ringan Pelana Bentang < 9 m Zinc-Alumuni m2 165,000.00 181,500.00
- Atap Baja Ringan Perisai Bentang < 9 m Zinc-Alumuni m2 175,000.00 192,500.00
- Atap Baja Ringan Joglo Bentang < 9 m Zinc-Alumuniu m2 185,000.00 203,500.00
- Atap Baja Ringan Pelana Bentang 10-12 m Zinc-Alum m2 175,000.00 192,500.00
- Atap Baja Ringan Perisai Bentang 10-12 m Zinc-Alum m2 190,000.00 209,000.00
- Atap Baja Ringan Joglo Bentang 10-12 m Zinc-Alumun m2 200,000.00 220,000.00
- Atap Baja Ringan Pelana Bentang > 12 m Zinc-Alumun m2 190,000.00 209,000.00
- Atap Baja Ringan Perisai Bentang > 12 m Zinc-Alumu m2 200,000.00 220,000.00
- Atap Baja Ringan Joglo Bentang > 12 m Zinc-Alumuni m2 210,000.00 231,000.00
b. Atap Baja Ringan Genteng Metal/Spandek ( jarak reng 37,5-90 cm)
- Atap Baja Ringan Pelana Bentang < 9 m Zinc-Alumuni m2 155,000.00 170,500.00
- Atap Baja Ringan Perisai Bentang < 9 m Zinc-Alumuni m2 162,500.00 178,750.00
- Atap Baja Ringan Joglo Bentang < 9 m Zinc-Alumuniu m2 170,000.00 187,000.00
- Atap Baja Ringan Pelana Bentang 10-12 m Zinc-Alum m2 160,000.00 176,000.00
- Atap Baja Ringan Perisai Bentang 10-12 m Zinc-Alum m2 175,000.00 192,500.00
- Atap Baja Ringan Joglo Bentang 10-12 m Zinc-Alumun m2 185,000.00 203,500.00
- Atap Baja Ringan Pelana Bentang > 12 m Zinc-Alumun m2 170,000.00 187,000.00
- Atap Baja Ringan Perisai Bentang > 12 m Zinc-Alumu m2 180,000.00 198,000.00
- Atap Baja Ringan Joglo Bentang > 12 m Zinc-Alumuni m2 190,000.00 209,000.00

165 Pintu Air Sorong


- Pintu Air Sorong Baja B = 0.40-0.60 ( 1 drat stang tanpa Unit 8,497,000.00 9,346,700.00
- Pintu Air Sorong Baja B = 0.70-0.80 ( 1 drat stang tanpa Unit 9,639,000.00 10,602,900.00
- Pintu Air Sorong Baja B = 0.90-1.00 ( 1 drat stang tanpa Unit 13,500,000.00 14,850,000.00
- Pintu Air Sorong Baja B = 0.70-1.00 ( 1 drat stang + roda Unit 11,414,000.00 12,555,400.00
- Pintu Air Sorong Baja B = 1.00-1.10 ( 2 drat stang + roda Unit 25,366,000.00 27,902,600.00
- Pintu Air Sorong Baja B = 1.50-1.80 ( 2 drat stang + roda Unit 38,049,000.00 41,853,900.00
- Pintu Air Sorong Baja B = 2.00-2.50 ( 2 drat stang + roda Unit 50,732,000.00 55,805,200.00
166 Gigi Payung / Jantung Besar bh 1,250,000.00 1,375,000.00
167 Gigi Payung / Jantung Sedang bh 1,100,000.00 1,210,000.00
168 Gigi Piring Besar bh 2,930,000.00 3,223,000.00
169 Gigi Piring Sedang bh 1,903,000.00 2,093,300.00
170 Blok Laher bh 1,750,000.00 1,925,000.00
171 Bron mur drat 5 " bh 3,250,000.00 3,575,000.00
172 Bron mur drat 3 " bh 2,150,000.00 2,365,000.00
173 Drat stang 2" x 100 bh 2,500,000.00 2,750,000.00
174 Drat stang 3/4" x 100 bh 1,750,000.00 1,925,000.00
175 Drat stang 1,5" x 100 bh 1,550,000.00 1,705,000.00
176 Dudukan as horisontal bh 1,850,000.00 2,035,000.00
177 As Horisontal bh 1,850,000.00 2,035,000.00
178 Karet sel 8 x 3 cm bh 1,500,000.00 1,650,000.00
179 As Pemutar bh 750,000.00 825,000.00
180 Laher/Bearing bh 350,000.00 385,000.00
181 Engkel Kemudi Sedang bh 450,000.00 495,000.00
182 Daun Pintu B.50, H.50 bh 1,000,000.00 1,100,000.00
183 Pintu Klep B=0,5 m unit 1,750,000.00 1,925,000.00
184 Pintu Klep B=1,0 m unit 3,000,000.00 3,300,000.00
185 Pintu Klep B=1,5 m unit 4,500,000.00 4,950,000.00

V. ASPAL
1 Aspal kemasan kg 12,100.00 12,100.00
2 Aspal curah kg 11,600.00 11,600.00
3 Aspal Emulsi ltr 10,500.00 10,500.00

VI. MINYAK
1 Premium liter 6,500.00 6,500.00
2 Premium (non subsidi) liter 11,400.00 11,400.00
3 Solar liter 5,500.00 5,500.00
4 Solar (non subsidi) liter 11,900.00 11,900.00
5 Minyak tanah liter 12,500.00 12,500.00
6 Olie SAE 20, 40, 60, 80 dan 120 liter 42,000.00 42,000.00
7 Pelumas bekisting liter 10,000.00 10,000.00
8 Stempet kg 25,000.00 25,000.00
kesimpulan
NO URAIAN BAHAN/MATERIAL SAT. HARGA TERTINGGI 2015 HARGA TERTINGGI 2015 harga survay
HARGA DASAR + 10 % tertinggi
VII.CETAKAN
1 Bata merah bh 800.00 900.00
2 Bata berongga bh 2,400.00 2,650.00
3 Batako bh 3,200.00 3,500.00
4 Genteng glazuur turbo ex Jatiwangi bh 3,500.00 3,850.00
5 Genteng nok/bubung diglazuur ex Jatiwangi bh 4,000.00 4,400.00
6 Genteng nok/bubung press mesin ex Jatiwangi bh 2,500.00 2,750.00
7 Genteng nok/bubung press tangan ex Jatiwangi bh 2,000.00 2,200.00
8 Genteng nok/bubung morando diglazuur bh 4,500.00 4,950.00
9 Genteng morando bh 3,500.00 3,850.00
10 Genteng nok/bubung morando bh 4,000.00 4,400.00
11 Genteng press diglazuur ex Jatiwangi bh 2,500.00 2,750.00
12 Genteng press mesin ex Jatiwangi bh 1,900.00 2,100.00
13 Genteng press tangan ex Jatiwangi bh 1,400.00 1,550.00
14 Genteng Type Viktoria bh 9,000.00 9,900.00
15 Genteng nok/bubung Type Viktoria bh 12,500.00 13,750.00
16 Genteng nok/bubung ujung Type Viktoria bh 20,000.00 22,000.00
17 Genteng nok/bubung ujung pertigaan Type Viktoria bh 25,000.00 27,500.00
18 Genteng beton bh 5,000.00 5,500.00
19 Genteng metal 70 x 80 cm lbr 48,000.00 52,800.00
20 Gorong-gorong buis beton dia. 100 cm bh/0,5 m' 150,000.00 165,000.00
21 Gorong-gorong buis beton dia. 80 cm bh/0,5 m' 130,000.00 143,000.00
22 Gorong-gorong buis beton dia. 60 cm bh/m' 140,000.00 154,000.00
23 Gorong-gorong buis beton dia. 40 cm bh/m' 100,000.00 110,000.00
24 Gorong-gorong buis beton dia. 30 cm bh/m' 80,000.00 88,000.00
25 Gorong-gorong buis beton dia. 20 cm bh/m' 60,000.00 66,000.00
26 Kansten Cetak 82,500.00 90,750.00
27 Gravel dia. 60 cm bh 75,000.00 82,500.00
28 Gravel dia. 40 cm bh 45,000.00 49,500.00
29 Gravel dia. 20 cm bh 35,000.00 38,500.00
30 Nok steel gelombang 1050 x 5 mm m' 29,000.00 31,900.00
31 Nok steel gelombang 920 x 5 mm m' 22,500.00 24,750.00
32 Nok / bubung genteng beton bh 6,000.00 6,600.00
33 Paving Block K.175 Segi Enam Netural tebal 8 cm m2 62,000.00 68,200.00
34 Paving Block K.175 Segi Enam motif tebal 8 cm m2 64,000.00 70,400.00
35 Paving Block K.175 Segi Enam warna tebal 8 cm m2 69,000.00 75,900.00
36 Paving Block K.175 Segi Enam Netural tebal 7 cm m2 55,000.00 60,500.00
37 Paving Block K.175 Segi Enam motif tebal 7 cm m2 58,000.00 63,800.00
38 Paving Block K.175 Segi Enam warna tebal 7 cm m2 64,000.00 70,400.00
39 Paving Block K.175 Segi Enam Netural tebal 6 cm m2 50,000.00 55,000.00
40 Paving Block K.175 Segi Enam motif tebal 6 cm m2 53,000.00 58,300.00
41 Paving Block K.175 Segi Enam warna tebal 6 cm m2 57,000.00 62,700.00
42 Paving Block K.125 Segi Enam Netural tebal 6 cm bh 43,000.00 47,300.00
43 Paving Block K.125 Segi Enam warna tebal 6 cm bh 47,000.00 51,700.00
44 Tiang pancang beton Pratekan m3 4,600,000.00 5,060,000.00
45 Digital printing m2 25,000.00 27,500.00
VIII. KAYU
1 Bambu Ø6 - Ø8 / 6 m btg 17,000.00 18,700.00
2 Kayu deplank 8/20 - 4 m (Jati Jateng) m3 9,800,000.00 10,780,000.00
3 Kayu deplank 8/20 - 4 m (Balau) m3 9,500,000.00 10,450,000.00
4 Kayu deplank 8/20 - 4 m (Borneo) m3 5,000,000.00 5,500,000.00
5 Kayu dolken O 8 - 10 /4 m btg 60,000.00 66,000.00
6 Kayu dolken O 12 - 15 /4 m btg 68,000.00 74,800.00
7 Kayu dolken O 5 /3 m btg 12,500.00 13,750.00
8 Kayu hutan/kayu perancah acuan m3 4,700,000.00 5,170,000.00
9 Kayu kamper m3 8,200,000.00 9,020,000.00
10 Kayu kaso 5/7 meranti m3 6,000,000.00 6,600,000.00
11 Kayu kaso 5/7 meranti btg 79,000.00 86,900.00
12 Kayu kruing m3 7,274,000.00 8,001,400.00
13 Kayu lanan m3 6,546,000.00 7,200,600.00
14 Kayu meranti m3 6,000,000.00 6,600,000.00
15 Kayu jati Jabar m3 8,200,000.00 9,020,000.00
16 Kayu Balau m3 9,500,000.00 10,450,000.00
17 Kayu Borneo m3 5,000,000.00 5,500,000.00
18 Kayu bakar m3 90,000.00 99,000.00
19 Reng kayu borneo ukuran 2/3 cm btg 54,000.00 59,400.00
20 Tali Ijuk kg 9,000.00 9,900.00
kesimpulan
NO URAIAN BAHAN/MATERIAL SAT. HARGA TERTINGGI 2015 HARGA TERTINGGI 2015 harga survay
HARGA DASAR + 10 % tertinggi
B. UPAH
1 Mandor /hari 85,000.00 85,000.00
2 Kepala tukang /hari 75,000.00 75,000.00
3 Tukang kayu / besi /hari 70,000.00 70,000.00
4 Tukang batu /hari 70,000.00 70,000.00
5 Pembantu tukang /hari 55,000.00 55,000.00
6 Operator terlatih /hari 100,000.00 100,000.00
7 Operator kurang terlatih /hari 55,000.00 55,000.00
8 Pembantu operator /hari 50,000.00 50,000.00
9 Supir truk /hari 55,000.00 55,000.00
10 Pembantu supir /hari 50,000.00 50,000.00
11 Mekanik /hari 55,000.00 55,000.00
12 Pembantu mekanik /hari 50,000.00 50,000.00
13 Buruh lapangan terlatih /hari 55,000.00 55,000.00
14 Buruh lapangan kurang terlatih /hari 50,000.00 50,000.00
15 Buruh lapangan tak terlatih / pekerja /hari 55,000.00 55,000.00

DINAS CIPTA KARYA DAN TATA


DINAS BINA MARGA RUANG DINAS PENGELOLAAN SUMBER DAYA AIR
KABUPATEN CIREBON KABUPATEN CIREBON DAN PERTAMBANGAN KAB.CIREBON
Kepala Seksi Perencanaan Teknik
Kepala Seksi Desain Teknik Kepala Seksi Bangunan Gedung
Jalan dan Jembatan

SUPARMAN,S.Sos, ST YEDI ADHI PRIATNA, BAE, S.Sos Ir. DAWUD


NIP. 19721230 199901 1 001 NIP. 19660815 199803 1 004 NIP. 19640525 199303 1 007

Kepala Bidang Bina Teknik Kepala Bidang Bangunan Gedung, Kepala Bidang Bina Teknik
Perumahan dan Permukiman

Ir. TETI MEIRAWATI Ir. FELLYANTO TAMZIL, MM AGUNG GUMILANG, SS., M.si
NIP. 19670502 199703 2 004 NIP. 19620428 199003 1 006 NIP. 19711224 199803 1 004

Kepala Dinas Bina Marga Kepala Dinas Cipta Karya dan Tata Kepala Dinas Pengelolaan Sumber Daya Air
Kabupaten Cirebon Ruang dan Pertambangan Kabupaten Cirebon
Kabupaten Cirebon

Ir. AVIP SUHERDIAN, MT DEDI NURUL SUDJUDI A


NIP. 19640827 199303 1 006 Ir. H. ARIEF BUDI PRAYITNO NIP. 19590721 198303 1 009
NIP. 19620428 199003 1 006
DAFTAR SATUAN ANALISA
DINAS PERUMAHAN KAWASAN PERMUKIMAN DAN PERTANAHAN
KABUPATEN CIREBON
TAHUN ANGGARAN 2020

HARGA SATUAN
NO KODE ANALISA SATUAN PEKERJAAN
Rp

A.2.2.1 HARGA SATUAN PEKERJAAN PERSIAPAN


1 A. 2.2.1.1 (K3) Pembuatan 1 m2 pagar sementara dari kayu tinggi 2 meter 530,776.03
2 A. 2.2.1.2 (K3) Pembuatan 1 m2 pagar sementara dari seng gelombang tinggi 2 meter 678,456.16
3 A. 2.2.1.3. (K3) Pembuatan 1 m2 pagar sementara dari kawat duri tinggi 1,8 meter 557,017.31
4 A. 2.2.1.4. Pengukuran dan pemasangan 1 m’ Bouwplank 80,305.05
5 A. 2.2.1.5. (K3) Pembuatan 1 m2 kantor sementara lantai plesteran (direksikeet) 1,751,015.73
6 A. 2.2.1.6. (K3) Pembuatan 1 m2 rumah jaga (konstruksi kayu ) 2,021,987.50
7 A. 2.2.1.7. (K3) Pembuatan 1 m2 gudang semen dan peralatan 1,718,246.91
8 A. 2.2.1.8. (K3) Pembuatan 1 m2 bedeng pekerja 1,734,695.51
9 A. 2.2.1.9. (K3) Pembersihan 1 m2 lapangan dan perataan 16,100.00
10 A. 2.2.1.10. (K3) Pembuatan 1 m2 steger/perancah dari bambu 117,921.81
11 A. 2.2.1.11. Pembuatan 1 buah kotak adukan ukuran 40 cm x 50 cm x 25 cm 275,643.50
12 A. 2.2.1.12. Pembuatan 1 m2 jalan sementara 190,472.34
13 A. 2.2.1.13. Pembongkaran 1 m3 beton bertulang 1,318,636.00
14 A. 2.2.1.14. Pembongkaran 1 m3 dinding tembok bata 659,318.00
15 A. 2.2.1.15. Pemasangan 1 m2 pagar kawat jaring galvanis panjang 240 cm 118,249.97
16 A.2.2.1.16. Pemasangan 1 m2 panel beton pracetak 5x50x240 cm untuk pagar 454,326.71
A.2.3.1 HARGA SATUAN PEKERJAAN TANAH
17 A.2.3.1.1. Penggalian 1 m3 tanah biasa sedalam 1 m 72,450.00
18 A.2.3.1.2. Penggalian 1 m3 tanah biasa sedalam 2 m 89,010.00
19 A.2.3.1.3. Menggali 1 m3 tanah biasa sedalam 3 m 105,846.00
20 A.2.3.1.4. Menggali 1 m3 tanah keras sedalam 1 m 96,416.00
21 A.2.3.1.5. Menggali 1 m3 tanah cadas sedalam 1 m 146,280.00
22 A.2.3.1.6. Menggali 1 m3 tanah lumpur sedalam 1 m 116,610.00
23 A.2.3.1.7. Pengerjaan stripping 1 m2 tanah tebing setinggi 1 meter 5,290.00
24 A.2.3.1.8. (K3) Pembuangan 1 m3 tanah sejauh 30 meter 31,740.00
25 A.2.3.1.9. Pengurugan kembali 1 m3 galian tanah 52,900.00
26 A.2.3.1.10. (K3) Pemadatan tanah 1 m3 tanah ( per 20 cm) 52,900.00
27 A.2.3.1.11. Pengurugan 1 m3 dengan pasir urug 336,381.90
28 A.2.3.1.12. Pemasangan 1 m3 lapisan pudel campuran 1KP : 3PP : 7TL 470,591.50
29 A.2.3.1.13. Pemasangan 1 m2 lapisan ijuk tebal 10 cm untuk bidang resapan 158,700.00
30 A.2.3.1.14. Pengurugan 1 m3 sirtu padat 304,175.00
A.3.2.1 HARGA SATUAN PEKERJAAN PONDASI
31 A.3.2.1.1. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 3PP 1,233,294.57
32 A.3.2.1.2. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 4PP 1,169,022.73
33 A.3.2.1.3 Pemasangan 1 m3 pondasi batu belah campuran 1SP : 5PP 1,124,467.70
34 A.3.2.1.4. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 6PP 1,093,142.63
35 A.3.2.1.5. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 8PP 1,050,209.33
36 A.3.2.1.6. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 1KP : 2PP 866,575.44
37 A.3.2.1.7. Pemasangan 1 m3 pondasi batu belah campuran 1 SP : 3 KP : 10 PP 1,013,066.91
38 A.3.2.1.8. Pemasangan 1 m3 pondasi batu belah campuran ¼ SP : 1 KP : 4PP 978,795.98
39 A.3.2.1.9. (K3) Pemasangan 1 m3 batu kosong (anstamping) 718,623.68
40 A.3.2.1.10. Pemasangan 1 m3 pondasi siklop, 60% beton campuran 1SP : 2 PB : 3 Kr dan 40% batu belah 3,471,317.55
41 A.3.2.1.11. Pemasangan 1 m3 pondasi sumuran, diameter 100 cm 1,103,789.55
A.4.1.1 HARGA SATUAN PEKERJAAN BETON
42 A.4.1.1.1 Membuat 1 m3 beton mutu f’c = 7,4 Mpa (sama dengan K 100), setara dengan beton rabat 1,152,338.01
43 A.4.1.1.2 Membuat 1 m3 beton mutu f’c = 9,8 Mpa (sama dengan K-125) 1,202,388.92
44 A.4.1.1.3 Membuat 1 m3 beton mutu f’c = 12,2 Mpa (sama denga K 150) 1,241,229.85
45 A.4.1.1.4 Membuat 1 m3 lantai kerja beton mutu f’c = 7,4 MPa slump (3-6) cm, w/c = 0,87 976,392.22
46 A.4.1.1.5. Membuat 1 m3 beton mutu f’c = 14,5 MPa, slump (120 ± 20) mm (sama dengan K 175) 1,287,632.44
47 A.4.1.1.6 Membuat 1 m3 beton mutu f’c = 16,9 Mpa (sama dengan K 220) 1,331,225.55
48 A.4.1.1.7. Membuat 1 m3 beton mutu f’c = 19,3 Mpa (sama dengan K 225) 1,364,984.52
49 A.4.1.1.8. Membuat 1 m3 beton mutu f’c = 21,7 Mpa (sama dengan K 250) 1,385,842.34
50 A.4.1.1.9. Membuat 1 m3 beton mutu f’c = 24,0 Mpa (sama dengan K 325) 1,421,730.79
51 A.4.1.1.10. Membuat 1 m3 beton mutu f’c = 26,4 Mpa (sama dengan K 350) 1,432,804.79
52 A.4.1.1.11. Membuat 1 m3 beton mutu f’c = 28,8 Mpa (sama dengan K 375) 1,529,904.55
53 A.4.1.1.12. Membuat 1 m3 beton mutu f’c = 31,2 MPa, slump (120 ± 20) mm (sama dengan K 425) 1,544,440.56

Untuk pekerjaan beton pracetak yang bisa diangkat 24 jam diperlukan penambahan bahan tambahan 2,346,565.56
54 A.4.1.1.13 Membuat 1 m3 beton kedap air dengan strorox – 100 1,475,875.50
55 A.4.1.1.14 Pemasangan 1 m’ PVC Waterstop lebar 150 mm 79,574.25
56 A.4.1.1.15 Pemasangan 1 m’ PVC Waterstop lebar 200 mm 185,963.63
57 A.4.1.1.16 Membuat 1 m’ PVC Waterstop lebar 230 mm – 320 mm 173,215.88
58 A.4.1.1.17 Pembesian 10 kg dengan besi polos atau besi ulir 204,277.38
59 A.4.1.1.18 Pemasangan 10 kg kabel prategang (prestressed) polos/strands 197,179.00
60 A.4.1.1.19 Pemasangan 10 kg jaring kawat baja (wiremesh) 135,468.28
61 A.4.1.1.20 (K3) Pemasangan 1 m2 bekisting untuk pondasi 282,313.50
62 A.4.1.1.21 (K3) Pemasangan 1 m2 bekisting untuk sloof 305,457.25
63 A.4.1.1.22 (K3) Pemasangan 1 m2 bekisting untuk kolom 623,760.72
64 A.4.1.1.23 (K3) Pemasangan 1 m2 bekisting untuk balok 643,598.22

II - 19
HARGA SATUAN
NO KODE ANALISA SATUAN PEKERJAAN
Rp
65 A.4.1.1.24 (K3) Pemasangan 1 m2 bekisting untuk lantai 967,610.72
66 A.4.1.1.25 (K3) Pemasangan 1 m2 bekisting untuk dinding 791,718.22
67 A.4.1.1.26 (K3) Pemasangan 1 m2 bekisting untuk tangga 576,811.97
68 A.4.1.1.27 Pemasangan 1 m2 jembatan untuk pengecoran beton 202,969.25
69 A.4.1.1.35 Membuat 1 m’ kolom praktis beton bertulang (11 x 11) cm 119,727.36
70 A.4.1.1.36 Membuat 1 m’ ring balok beton bertulang (10 x 15) cm 138,745.63

II - 20
HARGA SATUAN
NO KODE ANALISA SATUAN PEKERJAAN
Rp
A.4.1.2 HARGA SATUAN PEKERJAAN BETON PRACETAK
71 A.4.1.2.1. (K3) Pembuatan 1 m2 lahan produksi tebal 8 cm beton f’c 14,5 MPa, slump (120 ± 20) mm 103,027.16
72 A.4.1.2.2. (K3) Pembuatan 1 m2 lahan produksi tebal 10 cm beton f’c 14,5 MPa, slump (120 ± 20) mm 128,812.69
73 A.4.1.2.3. (K3) Pembuatan 1 m2 lahan produksi tebal 12 cm beton f’c 14,5 MPa, slump (120 ± 20) mm 154,471.73
74 A.4.1.2.4. (K3) Pembuatan 1 m2 lahan produksi tebal 15 cm beton f’c 14,5 MPa, slump (120 ± 20) mm 193,207.54
75 A.4.1.2.5. Pembuatan 1 m2 bekisting untuk pelat beton pracetak ( 5 kali pakai) 188,636.30
76 A.4.1.2.6 Pembuatan 1 m2 bekisting untuk balok beton pracetak (10-12 kali pakai) 59,104.62
77 A.4.1.2.7.
A.4.1.2.8. Pembuatan 1 m2 bekisting untuk kolom beton pracetak (10-12 kali pakai) 54,112.18
78 Pemasangan dan membuka bekisting 1 buah komponen pelat beton pracetak 7,843.00
79 A.4.1.2.9. Pemasangan dan membuka bekisting 1 buah komponen balok beton pracetak 12,673.00
80 A.4.1.2.10. Pemasangan dan membuka bekisting 1 buah komponen kolom beton pracetak 10,258.00
81 A.4.1.2.11. Penuangan/menebar beton 1 m3 komponen untuk pelat pracetak 67,712.00
82 A.4.1.2.12. Penuangan/menebar beton 1 m3 komponen untuk balok pracetak 69,598.00
83 A.4.1.2.13. Penuangan/menebar beton 1 m3 komponen kolom pracetak 62,617.50
84 A.4.1.2.14. Ereksi 1 buah komponen untuk pelat pracetak 898,961.91
85 A.4.1.2.15. Ereksi 1 buah komponen untuk balok pracetak 857,408.92
86 A.4.1.2.16. Ereksi 1 buah komponen untuk kolom pracetak 1,442,576.19
87 A.4.1.2.17. Langsir 1 buah komponen untuk pelat pracetak ( ± 20 m) 124,788.26
88 A.4.1.2.18. Langsir 1 buah komponen untuk balok pracetak ( ± 20 m) 124,788.26
89 A.4.1.2.19. Langsir 1 buah komponen untuk kolom pracetak ( ± 20 m) 124,788.26
90 A.4.1.2.20. Bahan 1 m3 grout campuran 3,967,931.25
91 A.4.1.2.21. Bahan 1 m3 grout (tidak campuran) 5,906,400.00
92 A.4.1.2.22. Upah 1 titik pekerjaan grout pada joint beton pracetak 61,743.50
93 A.4.1.2.23. Pemasangan 1 titik bekisting joint pracetak 147,662.30
94 A.4.1.2.24. Upah 1 titik joint dengan sling 52,371.00
A.4.2.1 HARGA SATUAN PEKERJAAN BESI DAN ALUMUNIUM
95 A.4.2.1.1. Pemasangan 1 kg besi profil 35,644.25
96 A.4.2.1.2. Pemasangan 1 kg rangka kuda-kuda baja IWF 35,644.25
97 A.4.2.1.3. Pengerjaan 100 kg pekerjaan perakitan 153,803.88
98 A.4.2.1.4. Pembuatan 1 m2 pintu besi pelat baja tebal 2 mm rangkap, rangka baja siku 743,127.13
99 A.4.2.1.5. Pengerjaan 10 cm pengelasan dengan las listrik 50,098.89
100 A.4.2.1.6. Pembuatan 1 m2 rangka jendela besi scuare tube 476,916.83
101 A.4.2.1.7. Pemasangan 1 m2 pintu rolling door besi 1,570,348.00
102 A.4.2.1.8. Pemasangan 1 m2 pintu lipat (folding door) bahan plastik/PVC 3,689,223.00
103 A.4.2.1.9. Pemasangan 1 m2 sunscreen alluminium 629,314.50
104 A.4.2.1.10. Pemasangan 1 m2 rolling door alluminium 768,200.00
105 A.4.2.1.11. Pemasangan 1 m kusen pintu alluminium 172,946.20
106 A.4.2.1.12. Pemasangan 1 m2 pintu alluminium strip lebar 8 cm 2,591,265.10
107 A.4.2.1.13. Pemasangan 1 m2 pintu kaca rangka alluminium 741,531.50
108 A.4.2.1.14. Pemasangan 1 m2 venetions blinds dan vertical blinds 224,238.50
109 A.4.2.1.15. Pemasangan 1 m2 terali besi strip (2 x 3) mm 669,298.40
110 A.4.2.1.16. Pemasangan 1 m2 kawat nyamuk 493,446.38
111 A.4.2.1.17. Pemasangan 1 m2 jendela nako & tralis 416,593.83
112 A.4.2.1.18. Pemasangan 1 m’ talang datar/ jurai seng bjls 28 lebar 90 cm 187,708.75
113 A.4.2.1.19 Pemasangan 1 m talang ½ lingkaran D-15 cm, seng pelat bjls 30 lebar 45 cm 119,118.44
114 A.4.2.1.20. Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x 120 cm, untuk partisi 235,761.50
115 A.4.2.1.21. Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x 60 cm, untuk plafon 284,809.00
116 A.4.2.1.22. (K3) Pemasangan 1 m2 atap pelana rangka atap baja canai dingin profil C75 237,982.32
117 A.4.2.1.22. (K3) Pemasangan 1 m2 atap jurai rangka atap baja canai dingin profil C75 256,865.15
A.4.4.1 HARGA SATUAN PEKERJAAN PASANGAN DINDING
118 A. 4.4.1.1. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 2PP 334,489.58
119 A. 4.4.1.2. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 3PP 317,495.78
120 A. 4.4.1.3. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 4PP 305,989.37
121 A. 4.4.1.4. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 5PP 300,126.40
122 A. 4.4.1.5 Pemasangan 1m2 Dinding Bata Merah (5x11x22) cm tebal 1 batu campuran 1SP : 6PP 298,302.67
123 A. 4.4.1.6 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 3KP : 10PP 282,932.54
124 A. 4.4.1.7 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 2PP 161,474.06
125 A. 4.4.1.8 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 3PP 153,385.52
126 A.4.4.1.9 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP :4PP 148,764.50
127 A. 4.4.1.10 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP :5PP 145,859.10
128 A. 4.4.1.11 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 6PP 144,330.03
129 A. 4.4.1.12 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SP :8PP 141,168.39
130 A. 4.4.1.13 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SP : 3KP :10PP 141,776.74
131 A. 4.4.1.14 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SM : 1KP :1PP 126,033.12
132 A. 4.4.1.15 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SM : 1KP :2PP 127,424.15
133 A. 4.4.1.16 rob Pemasangan 1m2 dinding conblock HB20 campuran 1SP : 3PP 109,487.88
134 A. 4.4.1.17 rob Pemasangan 1m2 dinding conblock HB20 campuran 1SP : 4PP 113,809.79
135 A. 4.4.1.18 rob Pemasangan 1m2 dinding conblock HB15 campuran 1SP : 3PP 96,458.12
136 A. 4.4.1.19 rob Pemasangan 1 m2 dinding conblock HB15 campuran 1SP :4PP 96,425.48
137 A. 4.4.1.20 rob Pemasangan 1 m2 dinding conblock HB10 campuran 1SP :3PP 83,004.99
138 A. 4.4.1.21.rob Pemasangan 1 m2 dinding conblock HB10 campuran 1SP : 4PP 83,050.93
139 A. 4.4.1.22 Pemasangan 1 m2 dinding terawang (rooster) 12x11x24 campuran 1SP :3PP 169,925.65
140 A. 4.4.1.23 Pemasangan 1 cm2 dinding terawang (rooster) 12x11x24 campuran 1SP :4PP 169,925.65
141 A. 4.4.1.24.rob Pemasangan 1 m2 dinding bata berongga ekspose 5x11x23 campuran 1SP :3PP 279,564.08
142 A. 4.4.1.25 Pemasangan 1 m2 dinding bata ringan tebal 7,5 cm dengan mortar siap pakai 297,021.78
143 A. 4.4.1.26 Pemasangan 1m2 dinding bata ringan tebal 10 cm dengan mortar siap pakai 302,808.44
A.4.4.2 HARGA SATUAN PEKERJAAN PLESTERAN
144 A.4.4.2.1. Pemasangan 1 m2 plesteran 1SP : 1PP tebal 15 mm 83,930.49
145 A.4.4.2.2. Pemasangan 1 m2 plesteran 1SP : 2PP tebal 15 mm 75,039.85
146 A.4.4.2.3. Pemasangan 1 m2 plesteran 1SP : 3PP tebal 15mm 71,211.33
147 A.4.4.2.4. Pemasangan 1 m2 plesteran 1SP : 4PP tebal 15 mm 68,583.03
148 A.4.4.2.5. Pemasangan 1 m2 plesteran 1SP : 5PP tebal 15 mm 67,112.39
149 A.4.4.2.6. Pemasangan 1 m2 plesteran 1SP : 6PP tebal 15 mm 65,926.36
150 A.4.4.2.7. Pemasangan 1 m2 plesteran 1SP : 7PP tebal 15 mm 65,281.17
151 A.4.4.2.8. Pemasangan 1 m2 plesteran 1SP : 8PP tebal 15 mm 64,635.99

II - 21
HARGA SATUAN
NO KODE ANALISA SATUAN PEKERJAAN
Rp
152 A.4.4.2.9. Pemasangan 1 m2 plesteran 1SP : 1/2KP : 3PP tebal 15 mm 67,460.89
153 A.4.4.2.10. Pemasangan 1 m2 plesteran 1SP : 2KP : 8PP tebal 15 mm 64,653.29
154 A.4.4.2.11. Pemasangan 1 m2 plesteran 1SM : 1KP : 1PP tebal 15 mm 57,375.97
155 A.4.4.2.12. Pemasangan 1 m2 plesteran 1SM : 1KP : 2PP tebal 15 mm 58,328.96
156 A.4.4.2.13. Pemasangan 1 m2 plesteran 1SP : 1PP tebal 20 mm 100,414.54

II - 22
HARGA SATUAN
NO KODE ANALISA SATUAN PEKERJAAN
Rp
157 A.4.4.2.14. Pemasangan 1 m2 plesteran 1SP : 3PP tebal 20 mm 81,187.85
158 A.4.4.2.15. Pemasangan 1 m2 plesteran 1SP : 4PP tebal 20 mm 91,720.04
159 A.4.4.2.16. Pemasangan 1 m2 plesteran 1SP : 5PP tebal 20 mm 89,844.59
160 A.4.4.2.17. Pemasangan 1 m2 plesteran 1SP : 6PP tebal 20 mm 88,177.81
161 A.4.4.2.18. Pemasangan 1 m2 plesteran 1SM : 1 KP : 2PP tebal 20 mm 81,624.08
162 A.4.4.2.19. Pemasangan 1 m2 berapen 1SP : 5PP tebal 15 mm 41,892.89
163 A.4.4.2.20. Pemasangan 1 m’ plesteran skoning 1SP : 3PP lebar 10 cm 68,302.02
164 A.4.4.2.21. Pemasangan 1 m2 plesteran granit 1SP : 2 granit tebal 1cm 194,177.50
165 A.4.4.2.22 Pemasangan 1 m2 plesteran traso 1SP : 2 traso tebal 1 cm 194,177.50
166 A.4.4.2.23. Pemasangan 1 m2 plesteran ciprat 1SP : 2PP 53,350.15
167 A.4.4.2.24 Pemasangan 1 m2 finishing siar pasangan bata merah 31,332.17
168 A.4.4.2.25. Pemasangan 1 m2 finishing siar pasangan conblock ekspose 14,976.22
169 A.4.4.2.26. Pemasangan 1 m2 finishing siar pasangan batu kali, campuran 1SP : 2PP 65,696.02
170 A.4.4.2.27. Pemasangan 1 m2 acian 39,913.34
A.4.4.3 HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING
171 A.4.4.3.2. Pemasangan 1 m2 lantai ubin PC abu-abu ukuran 30 cm x30 cm 111,955.73
172 A.4.4.3.3. Pemasangan 1 m2 lantai ubin PC abu-abu ukuran 20 cm x 20 cm 146,935.23
173 A.4.4.3.5. Pemasangan 1 m2 lantai ubin warna ukuran 30 cm x 30 cm 124,548.46
174 A.4.4.3.6. Pemasangan 1 m2 lantai ubin warna ukuran 20 cm x 20 cm 165,384.10
175 A.4.4.3.9. Pemasangan 1 m2 lantai ubin granit ukuran 40 cm x 40 cm 575,421.89
176 A.4.4.3.32. Pemasangan 1m2 lantai keramik artistik 10 cm x 20 cm 237,159.71
177 A.4.4.3.35. Pemasangan 1m2 lantai keramik ukuran 30 cm x 30 cm 216,767.02
178 A.4.4.3.36. Pemasangan 1m2 lantai keramik ukuran 20 cm x 20 cm 379,015.29
179 A.4.4.3.38. Pemasangan 1m2 lantai keramik mozaik ukuran 30 cm x 30 cm 233,563.43
180 A.4.4.3.39. Pemasangan 1 m’ plint keramik ukuran 10 cm x 20 cm 112,403.94
181 A.4.4.3.40. Pemasangan 1 m’ plint keramik ukuran 10 cm x 10 cm 154,657.82
182 A.4.4.3.41. Pemasangan 1 m’ plint keramik ukuran 5 cm x 20 cm 89,826.19
183 A.4.4.3.42. Pemasangan 1 m’ plint internal cove artistik 5 cm x 5 cm x 20 cm 288,310.82
184 A.4.4.3.43. Pemasangan 1 m2 lantai marmer ukuran 100cm x 100cm 1,267,789.25
185 A.4.4.3.44. Pemasangan 1 m2 lantai karpet 211,302.44
186 A.4.4.3.45. Pemasangan 1 m2 underlayer (pelapis bawah karpet) 129,842.19
187 A.4.4.3.46. Pemasangan 1 m2 lantai parquet kayu 380,983.50
188 A.4.4.3.47. Pemasangan 1 m2 lantai kayu gymfloor 380,983.50
189 A.4.4.3.49. Pemasangan 1 m2 dinding porselen 10 cm x 20 cm 266,135.90
190 A.4.4.3.50. Pemasangan 1 m2 dinding porselen 20 cm x 20 cm 258,386.05
191 A.4.4.3.51. Pemasangan 1 m2 dinding keramik artistik 10 cm x 20 cm 434,357.90
192 A.4.4.3.52. Pemasangan 1 m2 dinding keramik artistik 5 cm x 20 cm 435,548.15
193 A.4.4.3.53. Pemasangan 1 m2 dinding keramik 10 cm x 20 cm 266,135.90
194 A.4.4.3.54. Pemasangan 1 m2 dinding keramik 20 cm x 20 cm 259,708.55
195 A.4.4.3.55. Pemasangan 1 m2 dinding marmer 100 cm x 100 cm 1,377,773.18
196 A.4.4.3.56. Pemasangan 1 m2 dinding bata pelapis 3 cm x 7 cm x 24 cm 562,240.56
197 A.4.4.3.57. Pemasangan 1 m2 dinding batu paras 155,479.07
198 A.4.4.3.58. Pemasangan 1 m2 dinding batu tempel hitam 151,623.98
199 A.4.4.3.59. Pemasangan 1 m2 lantai vynil ukuran 30 cm x 30 cm 218,811.08
200 A.4.4.3.60. Pemasangan 1 m2 wallpaper lebar 50 cm 267,898.25
201 A.4.4.3.61. Pemasangan 1m2 floor harderner 92,845.25
202 A.4.4.3.62. Pemasangan 1 m’ plint vynil 15cm x 30cm 47,067.20
203 A.4.4.3.63. Pemasangan 1 m’ plint kayu tebal 2 cm lebar 10 cm 67,717.75
204 A.4.4.3.64. Pemasangan 1 m2 paving block natural tebal 6 cm 182,250.99
205 A.4.4.3.65. Pemasangan 1 m2 paving block natural tebal 8 cm 847,334.00
206 A.4.4.3.66. Pemasangan 1 m2 paving block berwarna tebal 6 cm 192,536.08
207 A.4.4.3.67. Pemasangan 1 m2 paving block berwarna tebal 8 cm 857,619.08
A.4.5.1 SATUAN PEKERJAAN LANGIT-LANGIT (PLAFOND)
208 A.4.5.1.1. Pemasangan 1 m2 langit-langit asbes semen, tebal 4 mm, 5 mm, dan 6 mm 67,223.25
209 A.4.5.1.2. Pemasangan 1 m2 langit-langit akustik ukuran (30 x 30) cm 839,396.50
210 A.4.5.1.3. Pemasangan 1 m2 langit-langit akustik ukuran (30 x 60) cm 421,222.00
211 A.4.5.1.4. Pemasangan 1 m2 langit-langit akustik ukuran (60 x 120) cm 126,413.75
212 A.4.5.1.5. Pemasangan 1 m2 langit-langit tripleks ukuran (120 x 240) cm, tebal 3 mm, 4 mm & 6 mm 66,372.25
213 A.4.5.1.6. Pemasangan 1 m2 langit-langit lambrisering kayu, tebal 9 mm 261,055.75
214 A.4.5.1.7. Pemasangan 1 m2 langit-langit gypsum board ukuran (120x240x9) mm, tebal 9 mm 45,087.48
215 A.4.5.1.8. Pemasangan 1 m2 langit-langit akustik ukuran (60 x 120) cm berikut rangka alluminium 699,331.10
216 A.4.5.1.9. Pemasangan 1 m’ list langit-langit kayu profil 18,958.90
A.4.5.2. HARGA SATUAN PEKERJAAN PENUTUP ATAP
217 A.4.5.2.1. Pemasangan 1 m2 atap genteng palentong kecil 55,182.75
218 A.4.5.2.2. Pemasangan 1 m2 atap genteng kodok glazuur 71,783.00
219 A.4.5.2.3. Pemasangan 1 m2 atap genteng palentong besar/super 49,300.50
220 A.4.5.2.4. Pemasangan 1 m’ bubung genteng palentong 101,584.10
221 A.4.5.2.5. Pemasangan 1 m’ bubung genteng kodok glazuur 114,809.10
222 A.4.5.2.6. Pemasangan 1 m’ bubung genteng palentong besar 120,099.10
223 A.4.5.2.7. Pemasangan 1 m2 roof light fibreglass 90 x 180 73,807.00
224 A.4.5.2.8. Pemasangan 1 m2 atap asbes gelombang 0,92 m x 2 ,5 m x 5 mm 48,909.50
225 A.4.5.2.9. Pemasangan 1 m2 atap asbes gelombang 0,92 m x 2,25 m x 5 mm 53,141.50
226 A.4.5.2.10. Pemasangan 1 m2 atap asbes gelombang 0,92 m x 2,00 m x 5 mm 52,233.00
227 A.4.5.2.11. Pemasangan 1 m2 atap asbes gelombang 0,92 m x 1,80 m x 5 mm 58,581.00
228 A.4.5.2.12. Pemasangan 1 m2 atap asbes gelombang 1,05 m x 3,00 m x 4 mm 41,653.00
229 A.4.5.2.13. Pemasangan 1 m2 atap asbes gelombang 1,05 m x 2,70 m x 4 mm 44,615.40
230 A.4.5.2.14. Pemasangan 1 m2 atap asbes gelombang 1,05 m x 2,40 m x 4 mm 45,461.80
231 A.4.5.2.15. Pemasangan 1 m2 atap asbes gelombang 1,05 m x 2,10 m x 4 mm 48,424.20
232 A.4.5.2.16. Pemasangan 1 m2 atap asbes gelombang 1,05 m x 1,50 m x 4 mm 60,697.00
233 A.4.5.2.17. Pemasangan 1 m2 atap asbes gelombang 1,08 m x 3,00 m x 6 mm 42,499.40
234 A.4.5.2.18. Pemasangan 1 m2 atap asbes gelombang 1,08 m x 2,70 m x 6 mm 42,922.60
235 A.4.5.2.19. Pemasangan 1 m2 atap asbes gelombang 1,08 m x 2,40 m x 6 mm 46,308.20
236 A.4.5.2.20. Pemasangan 1 m2 atap asbes gelombang 1,08 m x 2,10 m x 6 mm 47,577.80
237 A.4.5.2.21. Pemasangan 1 m2 atap asbes gelombang 1,08 m x 1,80 m x 6 mm 50,963.40
238 A.4.5.2.22. Pemasangan 1 m’ bubung stel gelombang 0,92 m 225,848.50

II - 23
HARGA SATUAN
NO KODE ANALISA SATUAN PEKERJAAN
Rp
239 A.4.5.2.23. Pemasangan 1 m’ bubung stel gelombang 1,05 m 201,250.00
240 A.4.5.2.24. Pemasangan 1 m’ bubung stel gelombang 1,08 m 197,150.25
241 A.4.5.2.25. Pemasangan 1 m’ nok paten 0,92 m 127,454.50
242 A.4.5.2.26. Pemasangan 1 m’ nok paten 1,05 m 127,454.50
243 A.4.5.2.27. Pemasangan 1 m’ nok paten 1,08 m 127,454.50

II - 24
HARGA SATUAN
NO KODE ANALISA SATUAN PEKERJAAN
Rp
244 A.4.5.2.28. Pemasangan 1 m’ nok stel rata 0,92 m 123,889.50
245 A.4.5.2.29. Pemasangan 1 m’ nok stel rata 1,05 m 119,255.00
246 A.4.5.2.30. Pemasangan 1 m2 genteng beton 107,341.00
247 A.4.5.2.32. Pemasangan 1 m2 genteng metal ukuran 80 x 100 atap pelana 120,382.00
248 A.4.5.2.33. Pemasangan 1 m2 genteng metal ukuran 80 x 100 atap jurai 164,818.00
249 A.4.5.2.34. Pemasangan 1 m2 atap sirap kayu 122,204.75
250 A.4.5.2.35. Pemasangan 1 m’ nok genteng beton 123,873.86
251 A.4.5.2.37. Pemasangan 1 m’ nok genteng metal 111,752.40
252 A.4.5.2.38. Pemasangan 1 m’ nok sirap 92,368.00
253 A.4.5.2.39. Pemasangan 1 m2 atap seng gelombang 94,875.00
254 A.4.5.2.40. Pemasangan 1 m’nok atap seng 57,247.00
255 A.4.5.2.41. Pemasangan 1 m2 atap alumunium 309,925.00
256 A.4.5.2.43. Pemasangan 1 m2 alumunium foil/sisalation 34,416.63
A.4.6.1 HARGA SATUAN PEKERJAAN KAYU
257 A.4.6.1.1. Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas I 17,531,462.50
258 A.4.6.1.2. Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas II atau III 8,746,037.50
259 A.4.6.1.3. Pembuatan dan pemasangan 1 m2 pintu klamp standar, kayu kelas II 447,821.50
260 A.4.6.1.4. Pembuatan dan pemasangan 1 m2 pintu klamp sederhana, kayu kelas III 368,471.50
261 A.4.6.1.5. Pembuatan dan pemasangan 1 m2 daun pintu panel, kayu kelas I atau II 804,137.50
262 A.4.6.1.6. Pembuatan dan pemasangan 1 m2 pintu dan jendela kaca, kayu kelas I atau II 586,442.50
263 A.4.6.1.7. Pembuatan dan pemasangan 1 m2 pintu dan jendela jalusi kayu kelas I atau II 962,837.50
264 A.4.6.1.8. Pembuatan 1 m2 daun pintu plywood rangkap, rangka kayu kelas II tertutup (lebar sampai 90 cm) 671,804.13
265 A.4.6.1.9. Pembuatan 1 m2 pintu plywood rangkap, rangka expose kayu kelas I atau II 727,751.63
266 A.4.6.1.10. Pemasangan 1 m2 jalusi kusen, kayu kelas I atau II 789,187.50
267 A.4.6.1.11. Pemasangan 1 m2 teakwood rangkap, rangka expose kayu kelas I 828,592.25
268 A.4.6.1.12. Pemasangan 1 m2 teakwood rangkap lapis formika, rangka expose kayu kelas II 725,707.50
269 A.4.6.1.13. Pemasangan 1 m3 konstruksi kuda-kuda konvensional, kayu kelas I, II dan III bentang 6 meter 7,591,710.63
270 A.4.6.1.14. Pemasangan 1 m3 konstruksi kuda-kuda expose, kayu kelas I 18,980,045.63
271 A.4.6.1.15. Pemasangan 1 m3 konstruksi gordeng, kayu kelas II 11,108,525.63
272 A.4.6.1.16. Pemasangan 1 m2 rangka atap genteng keramik, kayu kelas II 124,773.85
273 A.4.6.1.17. Pemasangan 1 m2 rangka atap genteng beton, kayu kelas II 125,745.89
274 A.4.6.1.18. Pemasangan 1 m2 rangka atap sirap, kayu kelas II 122,786.65
275 A.4.6.1.19. Pemasangan 1 m2 rangka langit-langit (50 x 100) cm, kayu kelas II atau III 173,362.50
276 A.4.6.1.20. Pemasangan 1 m2 rangka langit-langit (60 x 60) cm, kayu kelas II atau III 176,266.25
277 A.4.6.1.21. Pemasangan 1 m’ lisplank ukuran (3 x 20) cm, kayu kelas I atau kelas II 112,010.00
278 A.4.6.1.22. Pemasangan 1 m’ lisplank ukuran (3 x 30) cm, kayu kelas I atau kelas II 112,010.00
279 A.4.6.1.23. Pemasangan 1 m2 rangka dinding pemisah (60 x 120) cm kayu kelas II atau III 211,611.50
280 A.4.6.1.25. Pemasangan 1 m2 dinding pemisah plywood rangkap, rangka kayu kelas II 420,216.04
281 A.4.6.1.26. Pemasangan 1 m2 dinding lambrisering dari papan kayu kelas I 406,438.75
282 A.4.6.1.27. Pemasangan 1 m2 dinding lambrisering dari plywood ukuran (120 x 240) cm 63,152.25
A.4.6.2 HARGA SATUAN PEKERJAAN KUNCI DAN KACA
283 A.4.6.2.1. Pemasangan 1 buah kunci tanam antik 383,709.00
284 A.4.6.2.2. Pemasangan 1 buah kunci tanam biasa 237,072.50
285 A.4.6.2.3. Pemasangan 1 buah kunci kamar mandi 130,536.50
286 A.4.6.2.4. Pemasangan 1 buah kunci silinder 163,599.00
287 A.4.6.2.5. Pemasangan 1 buah engsel pintu 101,885.40
288 A.4.6.2.6. Pemasangan 1 buah engsel jendela kupu-kupu 48,081.50
289 A.4.6.2.7. Pemasangan 1 buah engsel angin 63,779.00
290 A.4.6.2.8. Pemasangan 1 buah spring knip 52,624.00
291 A.4.6.2.9. Pemasangan 1 buah kait angin 33,447.75
292 A.4.6.2.10. Pemasangan 1 buah door closer 445,464.00
293 A.4.6.2.11. Pemasangan 1 buah kunci slot (grendel) 45,908.00
294 A.4.6.2.12. Pemasangan 1 buah door holder 105,581.50
295 A.4.6.2.13. Pemasangan 1 buah door stop 68,540.00
296 A.4.6.2.14. Pemasangan 1 buah rel pintu sorong 552,989.00
297 A.4.6.2.15. Pemasangan 1 buah kunci lemari 225,308.00
298 A.4.6.2.16. Pemasangan 1 m2 kaca tebal 3 mm 117,325.59
299 A.4.6.2.17. Pemasangan 1 m2 kaca tebal 5 mm 134,418.90
300 A.4.6.2.18. Pemasangan 1 m2 kaca tebal 8 mm 247,639.85
301 A.4.6.2.19. Pemasangan 1 m2 kaca buram tebal 12 mm 565,879.93
302 A.4.6.2.20. Pemasangan 1 m2 kaca cermin tebal 5 mm 219,920.25
303 A.4.6.2.21. Pemasangan 1 m2 kaca cermin tebal 8 mm 401,546.08
304 A.4.6.2.22. Pemasangan 1 m2 kaca wireglassed tebal 5 mm 329,026.50
305 A.4.6.2.23. Pemasangan 1 m2 kaca patri tebal 5 mm 2,940,774.25
A.4.7.1 HARGA SATUAN PEKERJAAN PENGECATAN
306 A.4.7.1.1. 1 m2 Pengikisan/pengerokan permukaan cat lama 15,867.13
307 A.4.7.1.2. 1 m2 Pencucian bidang permukaan tembok yang pernah dicat 14,941.38
308 A.4.7.1.3. 1 m2 Pengerokan karat pada permukaan baja cara manual 15,631.38
309 A.4.7.1.4. 1 m2 Pengecatan bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup) 52,727.50
310 A.4.7.1.5. Pengecatan 1 m2 bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 3 lapis cat penutup) 70,308.70
311 A.4.7.1.6. Pelaburan 1 m2 bidang kayu dengan teak oil 35,159.53
312 A.4.7.1.7. Pelaburan 1 m2 bidang kayu dengan politur 50,559.24
313 A.4.7.1.8. Pelaburan 1 m2 bidang kayu dengan cat residu dan ter 22,757.06
314 A.4.7.1.9. Pelaburan 1 m2 bidang kayu dengan vernis 46,075.76
315 A.4.7.1.10. Pengecatan 1 m2 tembok baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup) 34,765.65
316 A.4.7.1.11. Pengecatan 1 m2 tembok lama (1 lapis cat dasar, 2 lapis cat penutup) 21,816.65
317 A.4.7.1.12. Pelaburan 1 m2 tembok dengan kalkarium 11,329.23
318 A.4.7.1.13. Pelaburan 1 m2 tembok dengan kapur sirih 18,385.05
319 A.4.7.1.14. Pelaburan 1 m2 tembok lama dengan kapur sirih (pemeliharaan) 9,619.75
320 A.4.7.1.15. Pemasangan 1 m2 wallpaper 147,154.00
321 A.4.7.1.16. Pengecatan 1 m2 permukaan baja dengan menie besi 36,222.70
322 A.4.7.1.17. Pengecatan 1 m2 permukaan baja dengan menie besi dengan perancah 71,155.10
323 A.4.7.1.18. Pengecatan 1 m2 permukaan baja galvanis secara manual 4 lapis 76,187.50
324 A.4.7.1.19. Pengecatan 1 m2 permukaan baja galvanis secara manual sistem 1 lapis cat mutakhir 37,477.35
325 A.4.7.1.20. Pengecatan 1 m2 permukaan baja galvanis secara manual sistem 3 lapis 172,364.88

II - 25
HARGA SATUAN
NO KODE ANALISA SATUAN PEKERJAAN
Rp
326 A.4.7.1.21. Pengecatan 1 m2 permukaan baja galvanis secara semprot sistem 3 lapis cat mutakhir 155,544.40
327 A.4.7.1.22. Plituran 10 m2 dengan plitur melamic 2,313,725.25
A.5.1.1 HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG
328 A.5.1.1.1. (K3) Pemasangan 1 buah closet duduk/monoblock 2,200,298.45
329 A.5.1.1 2. Pemasangan 1 buah closet jongkok porselen 523,510.04

II - 26
HARGA SATUAN
NO KODE ANALISA SATUAN PEKERJAAN
Rp
330 A.5.1.1 3. Pemasangan 1 buah closet jongkok teraso 462,675.04
331 A.5.1.1 4. (K3) Pemasangan 1 buah urinoir 1,368,823.29
332 A.5.1.1 5. (K3) Pemasangan 1 buah wastafel 1,555,958.88
333 A.5.1.1 7. (K3) Pemasangan 1 buah bak fiberglass vol 1 m3 1,302,214.00
334 A.5.1.1 9. Pemasangan 1 buah bak mandi teraso vol 0,30 m3 1,302,214.00
335 A.5.1.1 10. Pemasangan 1 buah bak air fiberglass vol 1 m3 418,669.00
336 A.5.1.1 12. Pemasangan 1 buah bak cuci piring stainlessteel 1,085,082.50
337 A.5.1.1 13. Pemasangan 1 buah bak cuci piring teraso 869,170.72
338 A.5.1.1 14. Pemasangan 1 buah floor drain 124,746.25
339 A.5.1.1 15. Pemasangan 1 buah bak kontrol pasangan bata 30x30 tinggi 35 cm 517,002.48
340 A.5.1.1 16. Pemasangan 1 buah bak kontrol pasangan bata 45cm x 45cm tinggi 50 cm 831,230.21
341 A.5.1.1 17. Pemasangan 1 buah bak kontrol pasangan bata 60 cm x 60 cm tinggi 65 cm 991,008.04
342 A.5.1.1 18. Pemasangan 1 m’ pipa galvanis diameter ½” 98,106.11
343 A.5.1.1 19. Pemasangan 1 buah kran diameter ½” atau ¾ ” 73,720.75
344 A.5.1.1 20. Pemasangan 1 m’ pipa galvanis diameter ¾ ” 113,399.78
345 A.5.1.1 21. Pemasangan 1 m’ pipa galvanis diameter 1” 190,395.01
346 A.5.1.1 22. Pemasangan 1 m’ pipa galvanis diameter 1 ½” 278,803.10
347 A.5.1.1 23. Pemasangan 1 m’ pipa galvanis diameter 3” 399,729.94
348 A.5.1.1 24. Pemasangan 1 m’ pipa galvanis diameter 4” 575,998.46
349 A.5.1.1 25. Pemasangan 1 m’ pipa PVC tipe AW diameter ½ ” 22,687.98
350 A.5.1.1 26. Pemasangan 1 m’ pipa PVC tipe AW diameter ¾ ” 26,178.22
351 A.5.1.1 27. Pemasangan 1 m’ pipa PVC tipe AW diameter 1” 32,340.82
352 A.5.1.1 28. Pemasangan 1 m’ pipa PVC tipe AW diameter 1 ½ ” 52,590.94
353 A.5.1.1 29. Pemasangan 1 m’ pipa PVC tipe AW diameter 2” 62,458.43
354 A.5.1.1 30. Pemasangan 1 m’ pipa PVC tipe AW diameter 2 ½ ” 91,729.16
355 A.5.1.1 31. Pemasangan 1 m’ pipa PVC tipe AW diameter 3” 117,043.84
356 A.5.1.1 32. Pemasangan 1 m’ pipa PVC tipe AW diameter 4” 175,705.05
357 A.5.1.1 33. Pemasangan 1 m’ pipa air limbah jenis pipa tanah Ǿ 20 cm 405,113.89
358 A.5.1.1 34. Pemasangan 1 m’ pipa air limbah jenis pipa tanah diameter 15 cm 225,856.90
359 A.5.1.1 35. Pemasangan 1 m’ pipa beton diameter 15 – 20 cm 1,072,627.17
360 A.5.1.1.36. Pemasangan 1 m’ pipa beton diameter 30 – 100 cm 200,947.04
A.8.4.6 HARGA SATUAN PEKERJAAN ELEKTRIKAL
361 A.8.4.6.1 (K3) Pemasangan 1 buah titik lampu (Instalasi) 6,370,482.50
362 A.8.4.6.1 (K3) Pemasangan 1 buah MCB (Penyambungan Daya ke PLN) 6,165,495.00

- TAMBAHAN / LAIN-LAIN
363 - 1 Buah Pembuatan Papan Nama Proyek 425,318.88
364 SNI 7395:2008 N0.6.9 Memasang 1 m2 lantai ubin granit ukuran 40 x 40 431,485.29
365 SNI 03-7395:2008 N0.6.9 Memasang 1 m2 lantai keramik ukuran 40 x 40 178,329.88
366 SNI 03-7395:2008 N0.6.9 Memasang 1 m2 lantai granit ukuran 60 x 60 352,538.19
367 SNI 2839:2008 N0.6.8 Memasang 1 m' List Plafond Gypsum Profil 43,017.19
368 SNI 2839:2008 N0.6.8 1 m' Pasang Listplank Woodplank 59,110.00
369 ABK.990.07 Menurunkan 1 m2 atap genteng 2,146.67
370 ABK.990.09 Menurunkan 1 m2 rangka atap/Plafond 6,593.33
371 ABK.990.12 Menurunkan 1 m3 kayu rangka kuda-kuda 82,493.33
372 ABK.990.05 Membongkar 1 m2 lantai tegel/floor 7,053.33
373 SNI 2012 1 m³ Bongkaran Beton Bertulang 659,318.00
374 SNI 2012 1 m³ Bongkaran Dinding Tembok Bata Merah 617,918.00
375 ABK.300.19 1 m3 Pekerjaan Beton AD. 1:2:3 1,089,200.65
376 - 1m2 Pasang Plafond Rangka Holo dan Dengan Penutup GRC Berikut Pengecatan 123,063.23
377 - 1 Titik Pekerjaan Instalasi Lampu dan Stop Kontak 194,396.00
378 - 1 Bh Pekerjaan Stop Kontak 40,882.50
379 - 1 Bh Pekerjaan Lampu SL 18 Watt + Fitting 71,300.00
380 - 1 Unit Pekerjaan Sekring Kast 63,365.00
381 - 1 Bh Pekerjaan MCB Box 63,365.00
382 - 1 m' Pekerjaan Over Spaneng 40,330.50
383 - 1 Bh Pekerjaan Saklar Ganda 68,540.00
384 - 1 Bh Pekerjaan Saklar Tunggal 64,572.50
385 A.3.2.1.2.a Pemasangan pasangan 1 m3 batu belah campuran 1SP : 4PP 1,169,022.73
JALAN LINGKUNGAN
386 Analisa EI-311a : Galian Biasa / Kupasan (menggunakan alat berat) 114,458.93
387 Analisa EI-321.rob : Timbunan Biasa 377,121.30
388 Analisa EI-322.rob : Timbunan Pilihan 462,654.43
389 Analisa EI-331.rob : Penyiapan Badan Jalan 195.87
390 Analisa EI-611a : Lapis Resap Pengikat - Aspal Cair 16,145.36
391 Analisa EI-612a : Lapis Perekat - Aspal Cair 16,655.58
392 Analisa EI-621 : Agregat Penutup BURTU 19,529.97
393 Analisa EI-631.rob : Latasir Kelas A (SS-A) 69,844.63
394 Analisa EI-632.rob : Latasir Kelas B (SS-B) 78,592.17
395 Analisa EI-661 : Lapis Permukaan Penetrasi Macadam 2,476,741.15
396 Analisa EI-662 : Lapis Pondasi/Perata Penetrasi Macadam 2,628,149.13
397 Analisa EI-814 : Waterbound Macadam Utk. Pek. Minor 493,706.69
398 Analisa EI-817 : Penetrasi Macadam Utk.Pek.Minor (Perata) 2,411,230.62
399 Analisa EI-412 : Lapis Pondasi Agregat Kelas A (Buruh) 571,293.68
400 Analisa EI-422 : Lapis Pondasi Agregat Kelas B (Buruh) 466,957.35
401 Analisa EI-192a rob : Udit Type U 300 X 300 680,193.65
402 Analisa EI-192b rob : Udit Type U 400 X 400 831,090.90
403 Analisa EI-181 : Bok Culvert BC 400 X 400 2,058,469.90
404 Analisa EI-182 : Box Culvert BC 500 x 500 HD 2,510,368.15
405 - 1 m2 Memasang Paving Block t = 8 cm (K - 250) 200,965.38
406 - 1 m' Memasang Kansteen, tebal 10 x 20 x 40 cm 177,795.85
407 Analisa EI-714 : Perkerasan Jalan Beton Ready Mix K-225 (dengan angkutan) 1,479,977.26
408 Analisa EI-619 : Beton Struktur Site Mix K-125 1,103,692.36

AIR TANAH DAN PERPIPAAN

II - 27
HARGA SATUAN
NO KODE ANALISA SATUAN PEKERJAAN
Rp
409 AT.02.a 1 m' Pengeboran Pilot hole Ø 6'' (daerah batuan keras) 542,807.48
410 AT.02.b 1 m' Pengeboran Pilot hole Ø 6'' (daerah batuan sedang) 417,715.51
411 AT.02.rob.1 1 m' Pengeboran sederhana 271,403.74
412 AT.03.a 1 m' Pengeboran Reaming Ø 10'' (daerah batuan keras) 501,931.30
413 AT.03.b 1 m' Pengeboran Reaming Ø 10'' (daerah batuan sedang) 386,212.55

II - 28
HARGA SATUAN
NO KODE ANALISA SATUAN PEKERJAAN
Rp
414 AT.07 1 m' Pengadaan dan pemasangan konstuksi pipa cassing PVC 6'' 360,999.49
415 AT.09 1 m' Pengadaan dan pemasangan konstuksi pipa cassing PVC 8'' 542,027.68
416 AT.12 1 m3 Pengadaan dan pemasangan gravel pack 3,412,935.50
417 AT.13 1 jam pencucian sumur 194,298.25
418 AT.14 1 jam Uji Pemompaan 194,298.25
437 - 1 m' Pemasangan pipa PVC dia. 350 mm melalui galian tanah berbatu / bongkar jalan 231,771.26
438 - 1 m' Pemasangan pipa PVC dia. 300 mm melalui galian tanah berbatu / bongkar jalan 217,232.43
439 - 1 m' Pemasangan pipa PVC dia. 250 mm melalui galian tanah berbatu / bongkar jalan 188,654.77
440 - 1 m' Pemasangan pipa PVC dia. 200 mm melalui galian tanah berbatu / bongkar jalan 146,373.03
441 - 1 m' Pemasangan pipa PVC dia. 160 mm melalui galian tanah berbatu / bongkar jalan 113,474.19
442 - 1 m' Pemasangan pipa PVC dia. 110 mm melalui galian tanah berbatu / bongkar jalan 91,309.35
443 - 1 m' Pemasangan pipa PVC dia. 90 mm melalui galian tanah berbatu / bongkar jalan 83,653.35
444 - 1 m' Pemasangan pipa PVC dia. 63 mm melalui galian tanah berbatu / bongkar jalan 52,543.51
445 - 1 m' Pemasangan pipa PVC dia. 50 mm melalui galian tanah berbatu / bongkar jalan 52,043.51
446 - 1 m' Pemasangan pipa PVC dia. 25 mm melalui galian tanah berbatu / bongkar jalan 23,800.60
447 - 1 m' Pemasangan pipa PVC dia. 350 mm melalui galian tanah keras / berbatu 205,737.34
448 - 1 m' Pemasangan pipa PVC dia. 300 mm melalui galian tanah keras / berbatu 192,825.63
449 - 1 m' Pemasangan pipa PVC dia. 250 mm melalui galian tanah keras / berbatu 167,502.21
450 - 1 m' Pemasangan pipa PVC dia. 200 mm melalui galian tanah keras / berbatu 128,622.63
451 - 1 m' Pemasangan pipa PVC dia. 160 mm melalui galian tanah keras / berbatu 100,161.39
452 - 1 m' Pemasangan pipa PVC dia. 110 mm melalui galian tanah keras / berbatu 80,659.11
453 - 1 m' Pemasangan pipa PVC dia. 90 mm melalui galian tanah keras / berbatu 74,186.47
454 - 1 m' Pemasangan pipa PVC dia. 63 mm melalui galian tanah keras / berbatu 47,218.39
455 - 1 m' Pemasangan pipa PVC dia. 50 mm melalui galian tanah keras / berbatu 46,718.39
456 - 1 m' Pemasangan pipa PVC dia. 25 mm melalui galian tanah keras / berbatu 20,250.52
457 - 1 m' Pemasangan pipa PVC dia. 350 mm melalui galian tanah biasa 184,647.26
458 - 1 m' Pemasangan pipa PVC dia. 300 mm melalui galian tanah biasa 173,053.68
459 - 1 m' Pemasangan pipa PVC dia. 250 mm melalui galian tanah biasa 150,366.52
460 - 1 m' Pemasangan pipa PVC dia. 200 mm melalui galian tanah biasa 114,243.03
461 - 1 m' Pemasangan pipa PVC dia. 160 mm melalui galian tanah biasa 89,376.69
462 - 1 m' Pemasangan pipa PVC dia. 110 mm melalui galian tanah biasa 72,031.35
463 - 1 m' Pemasangan pipa PVC dia. 90 mm melalui galian tanah biasa 66,517.35
464 - 1 m' Pemasangan pipa PVC dia. 63 mm melalui galian tanah biasa 42,904.51
465 - 1 m' Pemasangan pipa PVC dia. 50 mm melalui galian tanah biasa 42,404.51
466 - 1 m' Pemasangan pipa PVC dia. 25 mm melalui galian tanah biasa 17,374.60
467 - 1 m' Perbaikan pipa PVC dia. 350 mm melalui galian tanah berbatu / bongkar jalan 388,821.26
468 - 1 m' Perbaikan pipa PVC dia. 300 mm melalui galian tanah berbatu / bongkar jalan 333,324.75
469 - 1 m' Perbaikan pipa PVC dia. 250 mm melalui galian tanah berbatu / bongkar jalan 281,597.09
470 - 1 m' Perbaikan pipa PVC dia. 200 mm melalui galian tanah berbatu / bongkar jalan 232,573.03
471 - 1 m' Perbaikan pipa PVC dia. 160 mm melalui galian tanah berbatu / bongkar jalan 174,524.19
472 - 1 m' Perbaikan pipa PVC dia. 110 mm melalui galian tanah berbatu / bongkar jalan 141,709.35
473 - 1 m' Perbaikan pipa PVC dia. 90 mm melalui galian tanah berbatu / bongkar jalan 123,453.35
474 - 1 m' Perbaikan pipa PVC dia. 63 mm melalui galian tanah berbatu / bongkar jalan 77,693.51
475 - 1 m' Perbaikan pipa PVC dia. 50 mm melalui galian tanah berbatu / bongkar jalan 72,443.51
476 - 1 m' Perbaikan pipa PVC dia. 25 mm melalui galian tanah berbatu / bongkar jalan 40,750.60
477 - 1 m' Perbaikan pipa PVC dia. 350 mm melalui galian tanah keras / berbatu 362,787.34
478 - 1 m' Perbaikan pipa PVC dia. 300 mm melalui galian tanah keras / berbatu 308,759.25
479 - 1 m' Perbaikan pipa PVC dia. 250 mm melalui galian tanah keras / berbatu 260,444.53
480 - 1 m' Perbaikan pipa PVC dia. 200 mm melalui galian tanah keras / berbatu 214,822.63
481 - 1 m' Perbaikan pipa PVC dia. 160 mm melalui galian tanah keras / berbatu 161,211.39
482 - 1 m' Perbaikan pipa PVC dia. 110 mm melalui galian tanah keras / berbatu 131,059.11
483 - 1 m' Perbaikan pipa PVC dia. 90 mm melalui galian tanah keras / berbatu 113,986.47
484 - 1 m' Perbaikan pipa PVC dia. 63 mm melalui galian tanah keras / berbatu 72,368.39
485 - 1 m' Perbaikan pipa PVC dia. 50 mm melalui galian tanah keras / berbatu 67,118.39
486 - 1 m' Perbaikan pipa PVC dia. 25 mm melalui galian tanah keras / berbatu 37,200.52
487 - 1 m' Perbaikan pipa PVC dia. 350 mm melalui galian tanah biasa 341,697.26
488 - 1 m' Perbaikan pipa PVC dia. 300 mm melalui galian tanah biasa 289,146.00
489 - 1 m' Perbaikan pipa PVC dia. 250 mm melalui galian tanah biasa 243,308.84
490 - 1 m' Perbaikan pipa PVC dia. 200 mm melalui galian tanah biasa 200,443.03
491 - 1 m' Perbaikan pipa PVC dia. 160 mm melalui galian tanah biasa 150,426.69
492 - 1 m' Perbaikan pipa PVC dia. 110 mm melalui galian tanah biasa 122,431.35
493 - 1 m' Perbaikan pipa PVC dia. 90 mm melalui galian tanah biasa 106,317.35
494 - 1 m' Perbaikan pipa PVC dia. 63 mm melalui galian tanah biasa 68,054.51
495 - 1 m' Perbaikan pipa PVC dia. 50 mm melalui galian tanah biasa 62,804.51
496 - 1 m' Perbaikan pipa PVC dia. 25 mm melalui galian tanah biasa 34,324.60
497 - 400 m' Pengetesan pipa PVC dia. 350 mm 3,636,500.00
498 - 400 m' Pengetesan pipa PVC dia. 300 mm 3,037,500.00
499 - 400 m' Pengetesan pipa PVC dia. 250 mm 2,470,000.00
500 - 400 m' Pengetesan pipa PVC dia. 200 mm 1,934,000.00
501 - 400 m' Pengetesan pipa PVC dia. 160 mm 1,238,250.00
502 - 400 m' Pengetesan pipa PVC dia. 110 mm 1,198,500.00
503 - 400 m' Pengetesan pipa PVC dia. 90 mm 1,119,750.00
504 - 400 m' Pengetesan pipa PVC dia. 63 mm 1,072,500.00
505 - 400 m' Pengetesan pipa PVC dia. 50 mm 1,035,750.00
506 - 1 unit perbaikan gate valve dia. 350mm 821,119.05
507 - 1 unit perbaikan gate valve dia. 300mm 805,369.05
508 - 1 unit perbaikan gate valve dia. 250mm 794,869.05
509 - 1 unit perbaikan gate valve dia. 200mm 779,119.05
510 - 1 unit Perbaikan gate valve dia. 160 mm melalui galian tanah berbatu / bongkar jalan 522,023.88
511 - 1 unit Perbaikan gate valve dia. 110 mm melalui galian tanah berbatu / bongkar jalan 428,848.87
512 - 1 unit Perbaikan gate valve dia. 90 mm melalui galian tanah berbatu / bongkar jalan 378,272.87
513 - 1 unit Perbaikan gate valve dia. 63 mm melalui galian tanah berbatu / bongkar jalan 293,440.35
514 - 1 unit Perbaikan gate valve dia. 50 mm melalui galian tanah berbatu / bongkar jalan 272,940.35
515 - 1 unit Perbaikan gate valve dia. 25 mm melalui galian tanah berbatu / bongkar jalan 187,424.61
516 - 1 unit Perbaikan gate valve dia. 160 mm melalui galian tanah keras / berbatu 513,773.88

II - 29
HARGA SATUAN
NO KODE ANALISA SATUAN PEKERJAAN
Rp
517 - 1 unit Perbaikan gate valve dia. 110 mm melalui galian tanah keras / berbatu 423,098.87
518 - 1 unit Perbaikan gate valve dia. 90 mm melalui galian tanah keras / berbatu 378,272.87
519 - 1 unit Perbaikan gate valve dia. 63 mm melalui galian tanah keras / berbatu 293,440.35
520 - 1 unit Perbaikan gate valve dia. 50 mm melalui galian tanah keras / berbatu 272,940.35
521 - 1 unit Perbaikan gate valve dia. 25 mm melalui galian tanah keras / berbatu 187,424.61

II - 30
HARGA SATUAN
NO KODE ANALISA SATUAN PEKERJAAN
Rp
522 - 1 unit Perbaikan gate valve dia. 160 mm melalui galian tanah biasa 465,578.88
523 - 1 unit Perbaikan gate valve dia. 110 mm melalui galian tanah biasa 384,542.87
524 - 1 unit Perbaikan gate valve dia. 90 mm melalui galian tanah biasa 344,000.87
525 - 1 unit Perbaikan gate valve dia. 63 mm melalui galian tanah biasa 274,162.35
526 - 1 unit Perbaikan gate valve dia. 50 mm melalui galian tanah biasa 253,662.35
527 - 1 unit Perbaikan gate valve dia. 25 mm melalui galian tanah biasa 174,572.61
528 - 1 unit pemasangan gate valve dia. 200 mm 759,304.50
529 - 1 unit Pemasangan gate valve dia. 250 mm melalui galian tanah berbatu / bongkar jalan 694,629.03
530 - 1 unit Pemasangan gate valve dia. 160 mm melalui galian tanah berbatu / bongkar jalan 481,663.88
531 - 1 unit Pemasangan gate valve dia. 110 mm melalui galian tanah berbatu / bongkar jalan 389,488.87
532 - 1 unit Pemasangan feet kran dia. 90 mm melalui galian tanah berbatu / bongkar jalan 348,662.87
533 - 1 unit Pemasangan feet kran dia. 63 mm melalui galian tanah berbatu / bongkar jalan 259,080.35
534 - 1 unit Pemasangan feet kran dia. 50 mm melalui galian tanah berbatu / bongkar jalan 238,580.35
535 - 1 unit Pemasangan gate valve dia. 250 mm melalui galian tanah keras / berbatu 515,488.38
536 - 1 unit Pemasangan gate valve dia. 160 mm melalui galian tanah keras / berbatu 481,663.88
537 - 1 unit Pemasangan gate valve dia. 110 mm melalui galian tanah keras / berbatu 389,488.87
538 - 1 unit Pemasangan feet kran dia. 90 mm melalui galian tanah keras / berbatu 348,662.87
539 - 1 unit Pemasangan feet kran dia. 63 mm melalui galian tanah keras / berbatu 259,080.35
540 - 1 unit Pemasangan feet kran dia. 50 mm melalui galian tanah keras / berbatu 238,580.35
541 - 1 unit Pemasangan feet kran dia. 25 mm melalui galian tanah keras / berbatu 158,064.61
542 - 1 unit Pemasangan gate valve dia. 160 mm melalui galian tanah biasa 433,328.88
543 - 1 unit Pemasangan gate valve dia. 110 mm melalui galian tanah biasa 350,792.87
544 - 1 unit Pemasangan feet kran dia. 90 mm melalui galian tanah biasa 314,250.87
545 - 1 unit Pemasangan feet kran dia. 63 mm melalui galian tanah biasa 239,662.35
546 - 1 unit Pemasangan feet kran dia. 50 mm melalui galian tanah biasa 219,162.35
547 - 1 unit Pemasangan feet kran dia. 25 mm melalui galian tanah biasa 145,072.61
548 - 1 unit Pemasangan Box Street dia. 8" 236,440.65
549 - 1 unit Pemasangan Box Street dia. 6" 110,125.50
550 - 1 unit Pemasangan Box Street dia. 4" 92,780.16
551 - 1 unit Pemasangan Box Street dia. 3" 87,266.16
552 - 1 unit Pemasangan Box Street dia. 2" 63,653.32
553 - 1 unit Pemasangan Box Street dia. 1 1/2" 63,153.32
554 - 1 unit Pemasangan Box Street dia. 1" 38,123.41
555 - 1 unit Peninggian Box Street 136,140.82
556 - 1 unit Pemasangan wash out dia. 160 mm 661,461.06
557 - 1 unit Pemasangan wash out dia. 110 mm 534,606.61
558 - 1 unit Pemasangan wash out dia. 90 mm 482,202.05
559 - 1 unit Pemasangan wash out dia. 63 mm 345,966.90
560 - 1 unit Pemasangan wash out dia. 50 mm 323,466.90
561 - 18 m' Pemasangan Pipa PVC dia. 2" Sistim Boring Horizontal 4,329,643.97
562 - 18 m' Pemasangan Pipa PVC dia. 3" Sistim Boring Horizontal 6,710,112.02
563 - 18 m' Pemasangan Pipa PVC dia. 4" Sistim Boring Horizontal 7,787,655.38
564 - 18 m' Pemasangan Pipa PVC dia. 6" Sistim Boring Horizontal 9,713,544.22
565 - 18 m' Pemasangan Pipa PVC dia. 8" Sistim Boring Horizontal 13,587,848.10
566 - 18 m' Pemasangan Pipa PVC dia. 10" Sistim Boring Horizontal 14,366,586.23
567 - 18 m' Pemasangan Pipa PVC dia. 12" Sistim Boring Horizontal 16,246,399.50
568 - 18 m' Pemasangan Pipa PVC dia. 14" Sistim Boring Horizontal 17,018,006.13
569 - 1 m' Pemasangan pipa GI dia. 200 mm melalui galian type FR/CR 144,441.81
570 - 1 unit Tiang Penyangga 492,355.38
571 - 1 m2 Tebas Tebang Berupa Memotong dan Membersihkan Lokasi dari Tanaman/Tumbuhan dia < 15 cm 8,070.00
572 - 1 m3 Angkutan Bahan Material Jarak Angkut Setiap 100 m 59,340.00

Sumber, 2020

Kepala Dinas Perumahan, Kawasan Permukiman Dan Pertanahan Kabupaten Cirebon

H. SUKMA NUGRAHA, SH.,MM.


NIP. 19610301 198603 1 012

II - 31
DAFTAR ANALISA HARGA SATUAN
DINAS PERUMAHAN KAWASAN PERMUKIMAN DAN PERTANAHAN
KABUPATEN CIREBON
TAHUN ANGGARAN 2020

A.2.2.1 HARGA SATUAN PEKERJAAN PERSIAPAN


A. 2.2.1.1 (K3) Pembuatan 1 m2 pagar sementara dari kayu tinggi 2 meter
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.400 80,000.00 32,000.00
Tukang kayu L.02 OH 0.200 110,000.00 22,000.00
Kepala tukang L.03 OH 0.020 120,000.00 2,400.00
Mandor L.04 OH 0.020 120,000.00 2,400.00
JUMLAH TENAGA KERJA 58,800.00
B BAHAN
Dolken kayu Ø Batang 1.250 74,750.00 93,437.50
8-10/400 cm
Semen portland Kg 5.000 1,633.00 8,165.00
Pasir beton m3 0.005 244,375.00 1,221.88
Koral beton (kerikil) m3 0.009 230,000.00 2,070.00
Kayu 5/7 (kayu kelas III) m3 0.072 4,025,000.00 289,800.00
Paku biasa 2” – 5” Kg 0.060 23,000.00 1,380.00
Residu (ter kayu) Liter 0.400 16,675.00 6,670.00
JUMLAH HARGA BAHAN 402,744.38
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 461,544.38
E Overhead & Profit 15.00% 69,231.66
F Harga Satuan Pekerjaan (D+E) 530,776.03

A. 2.2.1.2 (K3) Pembuatan 1 m2 pagar sementara dari seng gelombang tinggi 2 meter

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.200 80,000.00 16,000.00
Tukang kayu L.02 OH 0.400 110,000.00 44,000.00
Kepala tukang L.03 OH 0.020 120,000.00 2,400.00
Mandor L.04 OH 0.020 120,000.00 2,400.00
JUMLAH TENAGA KERJA 64,800.00
B BAHAN
Dolken kayu Batang 1.250 74,750.00 93,437.50
f 8-10/400 cm
Semen portland Kg 2.500 1,633.00 4,082.50
Seng gelombang lbr 1.200 92,000.00 110,400.00
Pasir Beton m3 0.005 244,375.00 1,221.88
Koral Beton m3 0.009 230,000.00 2,070.00
Kayu 5/7 (kayu kelas III) m3 0.072 4,025,000.00 289,800.00
Paku biasa 2''-5'' Kg 0.060 23,000.00 1,380.00
Meni Besi ltr 0.450 50,600.00 22,770.00
JUMLAH HARGA BAHAN 525,161.88
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 589,961.88
E Overhead & Profit 15.00% 88,494.28
F Harga Satuan Pekerjaan (D+E) 678,456.16

A. 2.2.1.3. (K3) Pembuatan 1 m2 pagar sementara dari kawat duri tinggi 1,8 meter

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA

III - 32
Pekerja L.01 OH 0.200 80,000.00 16,000.00
Tukang kayu L.02 OH 0.300 110,000.00 33,000.00
Kepala tukang L.03 OH 0.020 120,000.00 2,400.00
Mandor L.04 OH 0.020 120,000.00 2,400.00
JUMLAH TENAGA KERJA 53,800.00

III - 33
B BAHAN
Dolken kayu f Batang 1.000 74,750.00 74,750.00
8-10/400 cm
Semen portland Kg 2.000 1,633.00 3,266.00
Kawat duri M’ 25.000 16,905.00 422,625.00
Pasir beton m3 0.005 244,375.00 1,221.88
Koral beton m3 0.009 230,000.00 2,070.00
Paku biasa 2” – 5” Kg 0.060 23,000.00 1,380.00
JUMLAH HARGA BAHAN 430,562.88
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 484,362.88


E Overhead & Profit 15.00% 72,654.43
F Harga Satuan Pekerjaan (D+E) 557,017.31

A. 2.2.1.4. Pengukuran dan pemasangan 1 m’ Bouwplank

Harga Satuan (Rp) Jumlah Harga (Rp)


No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 0.100 80,000.00 8,000.00
Tukang kayu L.02 OH 0.100 110,000.00 11,000.00
Kepala tukang L.03 OH 0.010 120,000.00 1,200.00
Mandor L.04 OH 0.005 120,000.00 600.00
JUMLAH TENAGA KERJA 20,800.00
B BAHAN
Kayu balok 5/7 m3 0.012 4,025,000.00 48,300.00
Paku 2''-3'' Kg 0.020 23,000.00 460.00
Kayu papan 3/20 m3 0.007 38,640.00 270.48
JUMLAH HARGA BAHAN 49,030.48
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 69,830.48


E Overhead & Profit 15.00% 10,474.57
F Harga Satuan Pekerjaan (D+E) 80,305.05

A. 2.2.1.5. (K3) Pembuatan 1 m2 kantor sementara lantai plesteran (direksikeet)

Harga Satuan (Rp) Jumlah Harga (Rp)


No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 2.000 80,000.00 160,000.00
Tukang kayu L.02 OH 2.000 110,000.00 220,000.00
Tukang batu L.02 OH 1.000 110,000.00 110,000.00
Kepala tukang L.03 OH 0.300 120,000.00 36,000.00
Mandor L.04 OH 0.050 120,000.00 6,000.00
JUMLAH TENAGA KERJA 532,000.00
B BAHAN
Dolken kayu Ø Batang 1.250 74,750.00 93,437.50
8-10/400 cm
Kayu (kelas III) m3 0.180 4,025,000.00 724,500.00
Paku biasa Kg 0.080 23,000.00 1,840.00
besi strip Kg 1.100 15,812.50 17,393.75
semen portland Kg 3.000 1,633.00 4,899.00
pasir pasang m3 0.150 222,812.50 33,421.88
pasir beton m3 0.100 244,375.00 24,437.50
koral beton m3 0.150 230,000.00 34,500.00
bata merah bh 30.000 900.00 27,000.00
seng pelat lbr 0.250 43,700.00 10,925.00
jendela naco bh 0.200 3,450.00 690.00
kaca polos m2 0.080 86,250.00 6,900.00
kunci tanam bh 0.150 28,750.00 4,312.50
plywood 4 mm lbr 0.060 106,087.50 6,365.25
JUMLAH HARGA BAHAN 990,622.38
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 1,522,622.38


E Overhead & Profit 15.00% 228,393.36
F Harga Satuan Pekerjaan (D+E) 1,751,015.73

III - 34
A. 2.2.1.6. (K3) Pembuatan 1 m2 rumah jaga (konstruksi kayu )

Harga Satuan (Rp) Jumlah Harga (Rp)


No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 1.000 80,000.00 80,000.00
Tukang kayu L.02 OH 1.500 110,000.00 165,000.00
Kepala tukang L.03 OH 0.150 120,000.00 18,000.00
Mandor L.04 OH 0.050 120,000.00 6,000.00
JUMLAH TENAGA KERJA 269,000.00
B BAHAN
Dolken kayu Ø Batang 3.000 74,750.00 224,250.00
8-10/400 cm
Kayu (kelas III) m3 0.276 4,025,000.00 1,110,900.00
Paku biasa Kg 0.700 23,000.00 16,100.00
Seng gelombang Kg 1.500 92,000.00 138,000.00
JUMLAH HARGA BAHAN 1,489,250.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 1,758,250.00


E Overhead & Profit 15.00% 263,737.50
F Harga Satuan Pekerjaan (D+E) 2,021,987.50

A. 2.2.1.7. (K3) Pembuatan 1 m2 gudang semen dan peralatan


Harga Satuan (Rp) Jumlah Harga (Rp)
No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 1.000 80,000.00 80,000.00
Tukang kayu L.02 OH 2.000 110,000.00 220,000.00
Kepala tukang L.03 OH 0.200 120,000.00 24,000.00
Mandor L.04 OH 0.050 120,000.00 6,000.00
JUMLAH TENAGA KERJA 330,000.00
B BAHAN
Dolken kayu Batang 1.700 74,750.00 127,075.00
diameter 8-10/400 cm
Kayu (kelas III) m3 0.210 4,025,000.00 845,250.00
Paku biasa Kg 0.300 23,000.00 6,900.00
Semen Portland Kg 10.500 1,633.00 17,146.50
Pasir beton m3 0.030 244,375.00 7,331.25
Koral beton m3 0.050 230,000.00 11,500.00
Seng gelombang Lbr 1.500 92,000.00 138,000.00
seng pelat Lbr 0.250 43,700.00 10,925.00
JUMLAH HARGA BAHAN 1,164,127.75
C PERALATAN
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 1,494,127.75


E Overhead & Profit 15.00% 224,119.16
F Harga Satuan Pekerjaan (D+E) 1,718,246.91

A. 2.2.1.8. (K3) Pembuatan 1 m2 bedeng pekerja


Harga Satuan (Rp) Jumlah Harga (Rp)
No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 1.000 80,000.00 80,000.00
Tukang kayu L.02 OH 2.000 110,000.00 220,000.00
Kepala tukang L.03 OH 0.200 120,000.00 24,000.00
Mandor L.04 OH 0.050 120,000.00 6,000.00
JUMLAH TENAGA KERJA 330,000.00
B BAHAN
Dolken kayu Batang 1.250 74,750.00 93,437.50
diameter 8-10/400 cm
Kayu (kelas III) m3 0.186 4,025,000.00 748,650.00
Paku biasa Kg 0.300 23,000.00 6,900.00
Semen Portland Kg 18.000 1,633.00 29,394.00
Pasir beton m3 0.030 244,375.00 7,331.25
Koral beton m3 0.050 230,000.00 11,500.00
Seng gelombang Lbr 1.500 92,000.00 138,000.00
plywood 4 mm Lbr 1.350 106,087.50 143,218.13
JUMLAH HARGA BAHAN 1,178,430.88
C PERALATAN

JUMLAH HARGA ALAT -

III - 35
D Jumlah (A+B+C) 1,508,430.88
E Overhead & Profit 15.00% 226,264.63
F Harga Satuan Pekerjaan (D+E) 1,734,695.51

III - 36
A. 2.2.1.9. (K3) Pembersihan 1 m2 lapangan dan perataan

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.100 80,000.00 8,000.00
Mandor L.04 OH 0.050 120,000.00 6,000.00
JUMLAH TENAGA KERJA 14,000.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 14,000.00


E Overhead & Profit 15.00% 2,100.00
F Harga Satuan Pekerjaan (D+E) 16,100.00

A. 2.2.1.10. (K3) Pembuatan 1 m2 steger/perancah dari bambu

Harga Satuan (Rp) Jumlah Harga (Rp)


No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 0.100 80,000.00 8,000.00
Tukang kayu L.02 OH 0.050 110,000.00 5,500.00
Kepala tukang L.03 OH 0.020 120,000.00 2,400.00
Mandor L.04 OH 0.005 120,000.00 600.00
JUMLAH TENAGA KERJA 16,500.00
B BAHAN
Bambu diameter Batang 1.250 19,550.00 24,437.50
6-8/600 cm
Tali ijuk m3 0.186 331,200.00 61,603.20
JUMLAH HARGA BAHAN 86,040.70
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 102,540.70


E Overhead & Profit 15.00% 15,381.11
F Harga Satuan Pekerjaan (D+E) 117,921.81

A. 2.2.1.11. Pembuatan 1 buah kotak adukan ukuran 40 cm x 50 cm x 25 cm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Tukang kayu L.02 OH 0.300 110,000.00 33,000.00
Kepala tukang L.03 OH 0.030 120,000.00 3,600.00
JUMLAH TENAGA KERJA 36,600.00
B BAHAN
Kayu papan kelas m3 0.036 4,025,000.00 144,900.00
III
Kayu balok 5/7 m3 0.014 4,025,000.00 56,350.00
kelas III
Paku biasa kg 0.080 23,000.00 1,840.00
JUMLAH HARGA BAHAN 203,090.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 239,690.00


E Overhead & Profit 15.00% 35,953.50
F Harga Satuan Pekerjaan (D+E) 275,643.50

A. 2.2.1.12. Pembuatan 1 m2 jalan sementara

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.000 80,000.00 80,000.00

III - 37
Mandor L.04 OH 0.005 120,000.00 600.00
JUMLAH TENAGA KERJA 80,600.00

III - 38
B BAHAN
Batu belah 10/15 cm m3 0.150 345,000.00 51,750.00
Batu pecah mesin 2-3 cm m3 0.090 345,000.00 31,050.00
Pasir pasang m3 0.010 222,812.50 2,228.13
JUMLAH HARGA BAHAN 85,028.13
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 165,628.13


E Overhead & Profit 15.00% 24,844.22
F Harga Satuan Pekerjaan (D+E) 190,472.34

A. 2.2.1.13. Pembongkaran 1 m3 beton bertulang

Harga Satuan (Rp) Jumlah Harga (Rp)


No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 13.334 80,000.00 1,066,720.00
Mandor L.04 OH 0.666 120,000.00 79,920.00
JUMLAH TENAGA KERJA 1,146,640.00
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 1,146,640.00


E Overhead & Profit 15.00% 171,996.00
F Harga Satuan Pekerjaan (D+E) 1,318,636.00

A. 2.2.1.14. Pembongkaran 1 m3 dinding tembok bata

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 6.667 80,000.00 533,360.00
Mandor L.04 OH 0.333 120,000.00 39,960.00
JUMLAH TENAGA KERJA 573,320.00
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 573,320.00


E Overhead & Profit 15.00% 85,998.00
F Harga Satuan Pekerjaan (D+E) 659,318.00

A. 2.2.1.15. Pemasangan 1 m2 pagar kawat jaring galvanis panjang 240 cm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 0.042 80,000.00 3,360.00
Tukang L.02 0.004 110,000.00 440.00
Kepala Tukang L.03 0.002 120,000.00 240.00
Mandor L.04 0.042 120,000.00 5,040.00
JUMLAH TENAGA KERJA 9,080.00
B BAHAN
Kawat jaring Lbr 0.143 653,738.20 93,746.06
JUMLAH HARGA BAHAN 93,746.06
C PERALATAN

JUMLAH HARGA ALAT -

III - 39
D Jumlah (A+B+C) 102,826.06
E Overhead & Profit 15.00% 15,423.91
F Harga Satuan Pekerjaan (D+E) 118,249.97

III - 40
A.2.2.1.16. Pemasangan 1 m2 panel beton pracetak 5x50x240 cm untuk pagar
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.375 80,000.00 30,000.00
Tukang L.02 OH 0.125 110,000.00 13,750.00
Kepala tukang L.03 OH 0.012 120,000.00 1,440.00
Mandor L.04 OH 0.019 120,000.00 2,280.00
JUMLAH TENAGA KERJA 47,470.00
B BAHAN
Panel beton Lbr 0.986 118,450.00 116,791.70
pracetak
Kolom beton Batang 0.525 201,250.00 105,656.25
pracetak
Semen PC Kg 45.000 1,633.00 73,485.00
Pasir beton m3 0.074 244,375.00 18,083.75
Koral m3 0.146 230,000.00 33,580.00
JUMLAH HARGA BAHAN 347,596.70
C PERALATAN
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 395,066.70


E Overhead & Profit 15.00% 59,260.01
F Harga Satuan Pekerjaan (D+E) 454,326.71

A.2.3.1 HARGA SATUAN PEKERJAAN TANAH


A.2.3.1.1. Penggalian 1 m3 tanah biasa sedalam 1 m

No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA
Pekerja L.01 OH 0.750 80,000.00 60,000.00
Mandor L.04 OH 0.025 120,000.00 3,000.00
JUMLAH TENAGA KERJA 63,000.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 63,000.00
E Overhead & Profit 15.00% 9,450.00
F Harga Satuan Pekerjaan (D+E) 72,450.00

A.2.3.1.2. Penggalian 1 m3 tanah biasa sedalam 2 m

Harga Satuan (Rp) Jumlah Harga (Rp)


No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 0.900 80,000.00 72,000.00
Mandor L.04 OH 0.045 120,000.00 5,400.00
JUMLAH TENAGA KERJA 77,400.00
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 77,400.00
E Overhead & Profit 15.00% 11,610.00
F Harga Satuan Pekerjaan (D+E) 89,010.00

A.2.3.1.3. Menggali 1 m3 tanah biasa sedalam 3 m

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.050 80,000.00 84,000.00
Mandor L.04 OH 0.067 120,000.00 8,040.00
JUMLAH TENAGA KERJA 92,040.00
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN

JUMLAH HARGA ALAT -

III - 41
D Jumlah (A+B+C) 92,040.00
E Overhead & Profit 15.00% 13,806.00
F Harga Satuan Pekerjaan (D+E) 105,846.00

III - 42
A.2.3.1.4. Menggali 1 m3 tanah keras sedalam 1 m

Harga Satuan (Rp) Jumlah Harga (Rp)


No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 1.000 80,000.00 80,000.00
Mandor L.04 OH 0.032 120,000.00 3,840.00
JUMLAH TENAGA KERJA 83,840.00
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 83,840.00


E Overhead & Profit 15.00% 12,576.00
F Harga Satuan Pekerjaan (D+E) 96,416.00

A.2.3.1.5. Menggali 1 m3 tanah cadas sedalam 1 m

Harga Satuan (Rp) Jumlah Harga (Rp)


No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 1.500 80,000.00 120,000.00
Mandor L.04 OH 0.060 120,000.00 7,200.00
JUMLAH TENAGA KERJA 127,200.00
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 127,200.00


E Overhead & Profit 15.00% 19,080.00
F Harga Satuan Pekerjaan (D+E) 146,280.00

A.2.3.1.6. Menggali 1 m3 tanah lumpur sedalam 1 m

Harga Satuan (Rp) Jumlah Harga (Rp)


No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 1.200 80,000.00 96,000.00
Mandor L.04 OH 0.045 120,000.00 5,400.00
JUMLAH TENAGA KERJA 101,400.00
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 101,400.00


E Overhead & Profit 15.00% 15,210.00
F Harga Satuan Pekerjaan (D+E) 116,610.00

A.2.3.1.7. Pengerjaan stripping 1 m2 tanah tebing setinggi 1 meter

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.050 80,000.00 4,000.00
Mandor L.04 OH 0.005 120,000.00 600.00
JUMLAH TENAGA KERJA 4,600.00
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 4,600.00
E Overhead & Profit 15.00% 690.00

III - 43
F Harga Satuan Pekerjaan (D+E) 5,290.00

III - 44
A.2.3.1.8. (K3) Pembuangan 1 m3 tanah sejauh 30 meter

Harga Satuan (Rp) Jumlah Harga (Rp)


No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 0.330 80,000.00 26,400.00
Mandor L.04 OH 0.010 120,000.00 1,200.00
JUMLAH TENAGA KERJA 27,600.00
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 27,600.00
E Overhead & Profit 15.00% 4,140.00
F Harga Satuan Pekerjaan (D+E) 31,740.00

A.2.3.1.9. Pengurugan kembali 1 m3 galian tanah

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.500 80,000.00 40,000.00
Mandor L.04 OH 0.050 120,000.00 6,000.00
JUMLAH TENAGA KERJA 46,000.00
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 46,000.00
E Overhead & Profit 15.00% 6,900.00
F Harga Satuan Pekerjaan (D+E) 52,900.00

A.2.3.1.10. (K3) Pemadatan tanah 1 m3 tanah ( per 20 cm)

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.500 80,000.00 40,000.00
Mandor L.04 OH 0.050 120,000.00 6,000.00
JUMLAH TENAGA KERJA 46,000.00
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 46,000.00
E Overhead & Profit 15.00% 6,900.00
F Harga Satuan Pekerjaan (D+E) 52,900.00

A.2.3.1.11. Pengurugan 1 m3 dengan pasir urug

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.300 80,000.00 24,000.00
Mandor L.04 OH 0.010 120,000.00 1,200.00
JUMLAH TENAGA KERJA 25,200.00
B BAHAN
Pasir urug 1.200 222,755.00 267,306.00
JUMLAH HARGA BAHAN 267,306.00
C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 292,506.00
E Overhead & Profit 15.00% 43,875.90
F Harga Satuan Pekerjaan (D+E) 336,381.90

III - 45
A.2.3.1.12. Pemasangan 1 m3 lapisan pudel campuran 1KP : 3PP : 7TL
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.800 80,000.00 64,000.00
Tukang L.02 OH 0.400 110,000.00 44,000.00
Kepala Tukang L.03 OH 0.040 120,000.00 4,800.00
Mandor L.04 OH 0.080 120,000.00 9,600.00
JUMLAH TENAGA KERJA 122,400.00
B BAHAN
Kapur Padam/bakar m3 0.135 253,000.00 34,155.00
Pasir Pasang m3 0.400 222,812.50 89,125.00
Tanah Liat m3 0.948 172,500.00 163,530.00
JUMLAH HARGA BAHAN 286,810.00
C PERALATAN
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 409,210.00


E Overhead & Profit 15.00% 61,381.50
F Harga Satuan Pekerjaan (D+E) 470,591.50

A.2.3.1.13. Pemasangan 1 m2 lapisan ijuk tebal 10 cm untuk bidang resapan


Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.150 80,000.00 12,000.00
Mandor L.04 OH 0.015 120,000.00 1,800.00
JUMLAH TENAGA KERJA 13,800.00
B BAHAN
Ijuk m3 6.000 20,700.00 124,200.00
JUMLAH HARGA BAHAN 124,200.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 138,000.00
E Overhead & Profit 15.00% 20,700.00
F Harga Satuan Pekerjaan (D+E) 158,700.00

A.2.3.1.14. Pengurugan 1 m3 sirtu padat


Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.250 80,000.00 20,000.00
Mandor L.04 OH 0.025 120,000.00 3,000.00
JUMLAH TENAGA KERJA 23,000.00
B BAHAN
Sirtu m3 1.200 201,250.00 241,500.00
JUMLAH HARGA BAHAN 241,500.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 264,500.00


E Overhead & Profit 15.00% 39,675.00
F Harga Satuan Pekerjaan (D+E) 304,175.00

A.3.2.1 HARGA SATUAN PEKERJAAN PONDASI


A.3.2.1.1. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 3PP

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.500 80,000.00 120,000.00
Tukang batu L.02 OH 0.750 110,000.00 82,500.00
Kepala tukang L.03 OH 0.075 120,000.00 9,000.00
Mandor L.04 OH 0.075 120,000.00 9,000.00
JUMLAH TENAGA KERJA 220,500.00
B BAHAN
Batu belah m3 1.200 345,000.00 414,000.00
Semen Portland Kg 202.000 1,633.00 329,866.00
Pasir pasang m3 0.485 222,812.50 108,064.06
JUMLAH HARGA BAHAN 851,930.06
C PERALATAN

III - 46
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 1,072,430.06
E Overhead & Profit 15.00% 160,864.51
F Harga Satuan Pekerjaan (D+E) 1,233,294.57

III - 47
A.3.2.1.2. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 4PP

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.500 80,000.00 120,000.00
Tukang batu L.02 OH 0.750 110,000.00 82,500.00
Kepala tukang L.03 OH 0.075 120,000.00 9,000.00
Mandor L.04 OH 0.075 120,000.00 9,000.00
JUMLAH TENAGA KERJA 220,500.00
B BAHAN
Batu belah m3 1.200 345,000.00 414,000.00
Semen Portland Kg 163.000 1,633.00 266,179.00
Pasir pasang m3 0.520 222,812.50 115,862.50
JUMLAH HARGA BAHAN 796,041.50
C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 1,016,541.50
E Overhead & Profit 15.00% 152,481.23
F Harga Satuan Pekerjaan (D+E) 1,169,022.73

A.3.2.1.3 Pemasangan 1 m3 pondasi batu belah campuran 1SP : 5PP


Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.500 80,000.00 120,000.00
Tukang batu L.02 OH 0.750 110,000.00 82,500.00
Kepala tukang L.03 OH 0.075 120,000.00 9,000.00
Mandor L.04 OH 0.075 120,000.00 9,000.00
JUMLAH TENAGA KERJA 220,500.00
B BAHAN
Batu belah m3 1.200 345,000.00 414,000.00
Semen Portland Kg 136.000 1,633.00 222,088.00
Pasir pasang m3 0.544 222,812.50 121,210.00
JUMLAH HARGA BAHAN 757,298.00
C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 977,798.00
E Overhead & Profit 15.00% 146,669.70
F Harga Satuan Pekerjaan (D+E) 1,124,467.70

A.3.2.1.4. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 6PP


Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.500 80,000.00 120,000.00
Tukang batu L.02 OH 0.750 110,000.00 82,500.00
Kepala tukang L.03 OH 0.075 120,000.00 9,000.00
Mandor L.04 OH 0.075 120,000.00 9,000.00
JUMLAH TENAGA KERJA 220,500.00
B BAHAN
Batu belah m3 1.200 345,000.00 414,000.00
Semen Portland Kg 117.000 1,633.00 191,061.00
Pasir pasang m3 0.561 222,812.50 124,997.81
JUMLAH HARGA BAHAN 730,058.81
C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 950,558.81
E Overhead & Profit 15.00% 142,583.82
F Harga Satuan Pekerjaan (D+E) 1,093,142.63

A.3.2.1.5. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 8PP


Harga Satuan (Rp) Jumlah Harga (Rp)
No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 1.500 80,000.00 120,000.00

III - 48
Tukang batu L.02 OH 0.750 110,000.00 82,500.00
Kepala tukang L.03 OH 0.075 120,000.00 9,000.00
Mandor L.04 OH 0.075 120,000.00 9,000.00
JUMLAH TENAGA KERJA 220,500.00

III - 49
B BAHAN
Batu belah m3 1.200 345,000.00 414,000.00
Semen Portland Kg 91.000 1,633.00 148,603.00
Pasir pasang m3 0.584 222,812.50 130,122.50
JUMLAH HARGA BAHAN 692,725.50
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 913,225.50
E Overhead & Profit 15.00% 136,983.83
F Harga Satuan Pekerjaan (D+E) 1,050,209.33

A.3.2.1.6. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 1KP : 2PP


Harga Satuan (Rp) Jumlah Harga (Rp)
No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 1.500 80,000.00 120,000.00
Tukang batu L.02 OH 0.750 110,000.00 82,500.00
Kepala tukang L.03 OH 0.075 120,000.00 9,000.00
Mandor L.04 OH 0.075 120,000.00 9,000.00
JUMLAH TENAGA KERJA 220,500.00
B BAHAN
Batu belah m3 1.200 345,000.00 414,000.00
Kapur (bakar) m3 0.170 253,000.00 43,010.00
Semen Portland kg 0.170 1,633.00 277.61
Pasir pasang m3 0.340 222,812.50 75,756.25
JUMLAH HARGA BAHAN 533,043.86
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 753,543.86
E Overhead & Profit 15.00% 113,031.58
F Harga Satuan Pekerjaan (D+E) 866,575.44

A.3.2.1.7. Pemasangan 1 m3 pondasi batu belah campuran 1 SP : 3 KP : 10 PP


Harga Satuan (Rp) Jumlah Harga (Rp)
No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 1.500 80,000.00 120,000.00
Tukang batu L.02 OH 0.750 110,000.00 82,500.00
Kepala tukang L.03 OH 0.075 120,000.00 9,000.00
Mandor L.04 OH 0.075 120,000.00 9,000.00
JUMLAH TENAGA KERJA 220,500.00
B BAHAN
Batu belah m3 1.200 345,000.00 414,000.00
Semen Portland Kg 61.000 1,633.00 99,613.00
Kapur m3 0.147 253,000.00 37,191.00
Pasir pasang m3 0.492 222,812.50 109,623.75
JUMLAH HARGA BAHAN 660,427.75
C PERALATAN
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 880,927.75


E Overhead & Profit 15.00% 132,139.16
F Harga Satuan Pekerjaan (D+E) 1,013,066.91

A.3.2.1.8. Pemasangan 1 m3 pondasi batu belah campuran ¼ SP : 1 KP : 4PP

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.500 80,000.00 120,000.00
Tukang batu L.02 OH 0.750 110,000.00 82,500.00
Kepala tukang L.03 OH 0.075 120,000.00 9,000.00
Mandor L.04 OH 0.075 120,000.00 9,000.00
JUMLAH TENAGA KERJA 220,500.00
B BAHAN
Batu belah m3 1.200 345,000.00 414,000.00
Semen Portland Kg 41.000 1,633.00 66,953.00
Kapur m3 0.131 253,000.00 33,143.00
Pasir pasang m3 0.523 222,812.50 116,530.94
JUMLAH HARGA BAHAN 630,626.94
C PERALATAN

JUMLAH HARGA ALAT -

III - 50
D Jumlah (A+B+C) 851,126.94
E Overhead & Profit 15.00% 127,669.04
F Harga Satuan Pekerjaan (D+E) 978,795.98

III - 51
A.3.2.1.9. (K3) Pemasangan 1 m3 batu kosong (anstamping)

Harga Satuan (Rp) Jumlah Harga (Rp)


No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 0.780 80,000.00 62,400.00
Tukang batu L.02 OH 0.390 110,000.00 42,900.00
Kepala tukang L.03 OH 0.039 120,000.00 4,680.00
Mandor L.04 OH 0.039 120,000.00 4,680.00
JUMLAH TENAGA KERJA 114,660.00
B BAHAN
Batu belah m3 1.200 345,000.00 414,000.00
Pasir urug m3 0.432 222,755.00 96,230.16
JUMLAH HARGA BAHAN 510,230.16
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 624,890.16


E Overhead & Profit 15.00% 93,733.52
F Harga Satuan Pekerjaan (D+E) 718,623.68

A.3.2.1.10. Pemasangan 1 m3 pondasi siklop, 60% beton campuran 1SP : 2 PB : 3 Kr dan 40% batu belah

Harga Satuan (Rp) Jumlah Harga (Rp)


No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 3.400 80,000.00 272,000.00
Tukang batu L.02 OH 0.850 110,000.00 93,500.00
Kepala tukang L.03 OH 0.085 120,000.00 10,200.00
Mandor L.04 OH 0.170 120,000.00 20,400.00
JUMLAH TENAGA KERJA 396,100.00
B BAHAN
Batu belah m3 0.480 345,000.00 165,600.00
Semen Portland Kg 194.000 1,633.00 316,802.00
Pasir beton m3 0.312 244,375.00 76,245.00
Kerikil m3 0.468 230,000.00 107,640.00
Besi beton Kg 126.000 14,950.00 1,883,700.00
Kawat beton Kg 1.800 40,250.00 72,450.00
JUMLAH HARGA BAHAN 2,622,437.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 3,018,537.00


E Overhead & Profit 15.00% 452,780.55
F Harga Satuan Pekerjaan (D+E) 3,471,317.55

A.3.2.1.11. Pemasangan 1 m3 pondasi sumuran, diameter 100 cm

Harga Satuan (Rp) Jumlah Harga (Rp)


No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 2.400 80,000.00 192,000.00
Tukang batu L.02 OH 0.800 110,000.00 88,000.00
Kepala tukang L.03 OH 0.080 120,000.00 9,600.00
Mandor L.04 OH 0.119 120,000.00 14,280.00
JUMLAH TENAGA KERJA 303,880.00
B BAHAN
Batu belah m3 0.450 345,000.00 155,250.00
Semen Portland Kg 194.000 1,633.00 316,802.00
Pasir beton m3 0.312 244,375.00 76,245.00
Kerikil m3 0.468 230,000.00 107,640.00
JUMLAH HARGA BAHAN 655,937.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 959,817.00


E Overhead & Profit 15.00% 143,972.55
F Harga Satuan Pekerjaan (D+E) 1,103,789.55

III - 52
A.4.1.1 HARGA SATUAN PEKERJAAN BETON
A.4.1.1.1 Membuat 1 m3 beton mutu f’c = 7,4 Mpa (sama dengan K 100), setara dengan beton rabat

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.650 80,000.00 132,000.00
Tukang batu L.02 OH 0.275 110,000.00 30,250.00
Kepala tukang L.03 OH 0.028 120,000.00 3,360.00
Mandor L.04 OH 0.083 120,000.00 9,960.00
JUMLAH TENAGA KERJA 175,570.00
B BAHAN
Semen Portland kg 247.000 1,633.00 403,351.00
Pasir beton kg 869.000 174.55 151,687.05
Kerikil (Maks 30 kg 999.000 255.56 255,300.00
mm)/menggunakan bt.pecah mesin 2-
3
Air Liter 215.000 75.00 16,125.00
JUMLAH HARGA BAHAN 826,463.05
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 1,002,033.05


E Overhead & Profit 15.00% 150,304.96
F Harga Satuan Pekerjaan (D+E) 1,152,338.01

A.4.1.1.2 Membuat 1 m3 beton mutu f’c = 9,8 Mpa (sama dengan K-125)

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.650 80,000.00 132,000.00
Tukang batu L.02 OH 0.275 110,000.00 30,250.00
Kepala tukang L.03 OH 0.028 120,000.00 3,360.00
Mandor L.04 OH 0.083 120,000.00 9,960.00
JUMLAH TENAGA KERJA 175,570.00
B BAHAN
1. Semen kg 276.000 1,633.00 450,708.00
Portland
2. Pasir beton kg 828.000 174.55 144,530.36
3. Kerikil kg 1,012.000 255.56 258,622.22
(Maks 30mm)
4. Air Liter 215.000 75.00 16,125.00
JUMLAH HARGA BAHAN 869,985.58
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 1,045,555.58


E Overhead & Profit 15.00% 156,833.34
F Harga Satuan Pekerjaan (D+E) 1,202,388.92

A.4.1.1.3 Membuat 1 m3 beton mutu f’c = 12,2 Mpa (sama denga K 150)

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.650 80,000.00 132,000.00
Tukang batu L.02 OH 0.275 110,000.00 30,250.00
Kepala tukang L.03 OH 0.028 120,000.00 3,360.00
Mandor L.04 OH 0.083 120,000.00 9,960.00
JUMLAH TENAGA KERJA 175,570.00
B BAHAN
Semen portland kg 299.000 1,633.00 488,267.00
Pasir beton kg 799.000 174.55 139,468.30
Kerikil (Maks 30 mm) kg 1,017.000 255.56 259,900.00
Air Liter 215.000 75.00 16,125.00
JUMLAH HARGA BAHAN 903,760.30
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 1,079,330.30

III - 53
E Overhead & Profit 15.00% 161,899.55
F Harga Satuan Pekerjaan (D+E) 1,241,229.85
CATATAN
Bobot isi pasir = 1.400 kg/m3, Bobot isi kerikil = 1.350 kg/m3, Buckling factor pasir = 20 %
1 MPA = 13.51kg/cm2

III - 54
A.4.1.1.4 Membuat 1 m3 lantai kerja beton mutu f’c = 7,4 MPa slump (3-6) cm, w/c = 0,87

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.200 80,000.00 96,000.00
Tukang batu L.02 OH 0.200 110,000.00 22,000.00
Kepala tukang L.03 OH 0.020 120,000.00 2,400.00
Mandor L.04 OH 0.060 120,000.00 7,200.00
JUMLAH TENAGA KERJA 127,600.00
B BAHAN
Semen Portland kg 230.000 1,633.00 375,590.00
Pasir beton kg 893.000 174.55 155,876.34
Kerikil kg 1,027.000 170.37 174,970.37
(Maks 30 mm)/bukan bt.pecah 2-3
Air Liter 200.000 75.00 15,000.00
JUMLAH HARGA BAHAN 721,436.71
C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 849,036.71
E Overhead & Profit 15.00% 127,355.51
F Harga Satuan Pekerjaan (D+E) 976,392.22

A.4.1.1.5. Membuat 1 m3 beton mutu f’c = 14,5 MPa, slump (120 ± 20) mm (sama dengan K 175)

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.650 80,000.00 132,000.00
Tukang batu L.02 OH 0.275 110,000.00 30,250.00
Kepala tukang L.03 OH 0.028 120,000.00 3,360.00
Mandor L.04 OH 0.083 120,000.00 9,960.00
JUMLAH TENAGA KERJA 175,570.00
B BAHAN
Semen Portland kg 326.000 1,633.00 532,358.00
Pasir beton kg 760.000 174.55 132,660.71
Kerikil (Maks kg 1,029.000 255.56 262,966.67
30mm)/menggunakan bt.pecah 2-3

Air Liter 215.000 75.00 16,125.00


JUMLAH HARGA BAHAN 944,110.38
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 1,119,680.38


E Overhead & Profit 15.00% 167,952.06
F Harga Satuan Pekerjaan (D+E) 1,287,632.44

A.4.1.1.6 Membuat 1 m3 beton mutu f’c = 16,9 Mpa (sama dengan K 220)

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.650 80,000.00 132,000.00
Tukang batu L.02 OH 0.275 110,000.00 30,250.00
Kepala tukang L.03 OH 0.028 120,000.00 3,360.00
Mandor L.04 OH 0.083 120,000.00 9,960.00
JUMLAH TENAGA KERJA 175,570.00
B BAHAN
Semen Portland kg 352.000 1,633.00 574,816.00
Pasir beton kg 731.000 174.55 127,598.66
Kerikil (Maks kg 1,031.000 255.56 263,477.78
30mm)
Air Liter 215.000 75.00 16,125.00
JUMLAH HARGA BAHAN 982,017.44
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 1,157,587.44

III - 55
E Overhead & Profit 15.00% 173,638.12
F Harga Satuan Pekerjaan (D+E) 1,331,225.55

III - 56
A.4.1.1.7. Membuat 1 m3 beton mutu f’c = 19,3 Mpa (sama dengan K 225)

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.650 80,000.00 132,000.00
Tukang batu L.02 OH 0.275 110,000.00 30,250.00
Kepala tukang L.03 OH 0.028 120,000.00 3,360.00
Mandor L.04 OH 0.083 120,000.00 9,960.00
JUMLAH TENAGA KERJA 175,570.00
B BAHAN
Semen Portland kg 371.000 1,633.00 605,843.00
Pasir beton kg 698.000 174.55 121,838.39
Kerikil (Maks kg 1,047.000 255.56 267,566.67
30mm)
Air Liter 215.000 75.00 16,125.00
JUMLAH HARGA BAHAN 1,011,373.06
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 1,186,943.06


E Overhead & Profit 15.00% 178,041.46
F Harga Satuan Pekerjaan (D+E) 1,364,984.52

A.4.1.1.8. Membuat 1 m3 beton mutu f’c = 21,7 Mpa (sama dengan K 250)

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.650 80,000.00 132,000.00
Tukang batu L.02 OH 0.275 110,000.00 30,250.00
Kepala tukang L.03 OH 0.028 120,000.00 3,360.00
Mandor L.04 OH 0.083 120,000.00 9,960.00
JUMLAH TENAGA KERJA 175,570.00
B BAHAN
Semen Portland kg 384.000 1,633.00 627,072.00
Pasir beton kg 692.000 174.55 120,791.07
Kerikil kg 1,039.000 255.56 265,522.22
(Maksimum
30mm)
Air Liter 215.000 75.00 16,125.00
JUMLAH HARGA BAHAN 1,029,510.29
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 1,205,080.29


E Overhead & Profit 15.00% 180,762.04
F Harga Satuan Pekerjaan (D+E) 1,385,842.34

A.4.1.1.9. Membuat 1 m3 beton mutu f’c = 24,0 Mpa (sama dengan K 325)

Harga Jumlah
Uraian Kode Satuan Koefisien Satuan Harga
No (Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.650 80,000.00 132,000.00
Tukang batu L.02 OH 0.275 110,000.00 30,250.00
Kepala tukang L.03 OH 0.028 120,000.00 3,360.00
Mandor L.04 OH 0.083 120,000.00 9,960.00
JUMLAH TENAGA KERJA 175,570.00
B BAHAN
Semen Portland kg 406.000 1,633.00 662,998.00
Pasir beton kg 684.000 174.55 119,394.64
Kerikil (Maks kg 1,026.000 255.56 262,200.00
30mm)
Air Liter 215.000 75.00 16,125.00
JUMLAH HARGA BAHAN 1,060,717.64
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 1,236,287.64

III - 57
E Overhead & Profit 15.00% 185,443.15
F Harga Satuan Pekerjaan (D+E) 1,421,730.79

III - 58
A.4.1.1.10. Membuat 1 m3 beton mutu f’c = 26,4 Mpa (sama dengan K 350)

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.650 80,000.00 132,000.00
Tukang batu L.02 OH 0.275 110,000.00 30,250.00
Kepala tukang L.03 OH 0.028 120,000.00 3,360.00
Mandor L.04 OH 0.083 120,000.00 9,960.00
JUMLAH TENAGA KERJA 175,570.00
B BAHAN
Semen Portland kg 413.000 1,633.00 674,429.00
Pasir beton kg 681.000 174.55 118,870.98
Kerikil (Maks kg 1,021.000 255.56 260,922.22
30mm)
Air Liter 215.000 75.00 16,125.00
JUMLAH HARGA BAHAN 1,070,347.20
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 1,245,917.20


E Overhead & Profit 15.00% 186,887.58
F Harga Satuan Pekerjaan (D+E) 1,432,804.79

A.4.1.1.11. Membuat 1 m3 beton mutu f’c = 28,8 Mpa (sama dengan K 375)

Harga Satuan (Rp) Jumlah Harga (Rp)


No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 2.100 80,000.00 168,000.00
Tukang batu L.02 OH 0.350 110,000.00 38,500.00
Kepala tukang L.03 OH 0.035 120,000.00 4,200.00
Mandor L.04 OH 0.105 120,000.00 12,600.00
JUMLAH TENAGA KERJA 223,300.00
B BAHAN
Semen Portland kg 439.000 1,633.00 716,887.00
Pasir beton kg 670.000 174.55 116,950.89
Kerikil (Maks 30 kg 1,006.000 255.56 257,088.89
mm)
Air Liter 215.000 75.00 16,125.00
JUMLAH HARGA BAHAN 1,107,051.78
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 1,330,351.78


E Overhead & Profit 15.00% 199,552.77
F Harga Satuan Pekerjaan (D+E) 1,529,904.55

A.4.1.1.12. Membuat 1 m3 beton mutu f’c = 31,2 MPa, slump (120 ± 20) mm (sama dengan K 425)

Harga Satuan (Rp) Jumlah Harga (Rp)


No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 2.100 80,000.00 168,000.00
Tukang batu L.02 OH 0.350 110,000.00 38,500.00
Kepala tukang L.03 OH 0.035 120,000.00 4,200.00
Mandor L.04 OH 0.105 120,000.00 12,600.00
JUMLAH TENAGA KERJA 223,300.00
B BAHAN
Semen Portland kg 448.000 1,633.00 731,584.00
Pasir beton kg 667.000 174.55 116,427.23
Kerikil (Maks kg 1,000.000 255.56 255,555.56
30mm)
Air Liter 215.000 75.00 16,125.00
JUMLAH HARGA BAHAN 1,119,691.79
C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 1,342,991.79
E Overhead & Profit 15.00% 201,448.77
F Harga Satuan Pekerjaan (D+E) 1,544,440.56

III - 59
Untuk pekerjaan beton pracetak yang bisa diangkat 24 jam diperlukan penambahan bahan tambahan
sesuai Tabel berikut:
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 2.100 80,000.00 168,000.00
Tukang batu L.02 OH 0.350 110,000.00 38,500.00
Kepala tukang L.03 OH 0.035 120,000.00 4,200.00
Mandor L.04 OH 0.105 120,000.00 12,600.00
JUMLAH TENAGA KERJA 223,300.00
B BAHAN
Semen Portland kg 448.000 1,633.00 731,584.00
Pasir beton kg 667.000 174.55 116,427.23
Kerikil (maksimum kg 1,000.000 255.56 255,555.56
30 mm)
Bahan tambahan Liter 4.500 155,250.00 698,625.00
kimia (efoksi)
Air Liter 200.000 75.00 15,000.00
JUMLAH HARGA BAHAN 1,817,191.79
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 2,040,491.79


E Overhead & Profit 15.00% 306,073.77
F Harga Satuan Pekerjaan (D+E) 2,346,565.56
CATATAN: Bobot isi pasir = 1400 kg/m3, Bobot isi kerikil = 1350 kg/m3, Buckling factor pasir = 20%

A.4.1.1.13 Membuat 1 m3 beton kedap air dengan strorox – 100

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 2.100 80,000.00 168,000.00
Tukang batu L.02 OH 0.350 110,000.00 38,500.00
Kepala tukang L.03 OH 0.035 120,000.00 4,200.00
Mandor L.04 OH 0.105 120,000.00 12,600.00
JUMLAH TENAGA KERJA 223,300.00
B BAHAN
Semen Portland kg 400.000 1,633.00 653,200.00
Pasir beton m3 0.480 244,375.00 117,300.00
Kerikil (2cm/3cm) m3 0.800 230,000.00 184,000.00
Strorox – 100 kg 1.200 87,975.00 105,570.00
JUMLAH HARGA BAHAN 1,060,070.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 1,283,370.00


E Overhead & Profit 15.00% 192,505.50
F Harga Satuan Pekerjaan (D+E) 1,475,875.50

A.4.1.1.14 Pemasangan 1 m’ PVC Waterstop lebar 150 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.060 80,000.00 4,800.00
Tukang Batu/Pipa L.02 OH 0.030 110,000.00 3,300.00
Kepala Tukang L.03 OH 0.003 120,000.00 360.00
Mandor L.04 OH 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 8,820.00
B BAHAN
Waterstop lebar m 1.050 57,500.00 60,375.00
150 mm
JUMLAH HARGA BAHAN 60,375.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 69,195.00


E Overhead & Profit 15.00% 10,379.25

III - 60
F Harga Satuan Pekerjaan (D+E) 79,574.25

III - 61
A.4.1.1.15 Pemasangan 1 m’ PVC Waterstop lebar 200 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.070 80,000.00 5,600.00
Tukang Batu/Pipa L.02 OH 0.035 110,000.00 3,850.00
Kepala Tukang L.03 OH 0.004 120,000.00 480.00
Mandor L.04 OH 0.007 120,000.00 840.00
JUMLAH TENAGA KERJA 10,770.00
B BAHAN
Waterstop lebar m 1.050 143,750.00 150,937.50
200 mm
JUMLAH HARGA BAHAN 150,937.50
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 161,707.50


E Overhead & Profit 15.00% 24,256.13
F Harga Satuan Pekerjaan (D+E) 185,963.63

A.4.1.1.16 Membuat 1 m’ PVC Waterstop lebar 230 mm – 320 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.080 80,000.00 6,400.00
Tukang Batu L.02 OH 0.040 110,000.00 4,400.00
Kepala Tukang L.03 OH 0.004 120,000.00 480.00
Mandor L.04 OH 0.004 120,000.00 480.00
JUMLAH TENAGA KERJA 11,760.00
B BAHAN
Waterstop lebar m 1.050 132,250.00 138,862.50
230 mm - 320 mm
JUMLAH HARGA BAHAN 138,862.50
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 150,622.50


E Overhead & Profit 15.00% 22,593.38
F Harga Satuan Pekerjaan (D+E) 173,215.88

A.4.1.1.17 Pembesian 10 kg dengan besi polos atau besi ulir

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.070 80,000.00 5,600.00
Tukang besi L.02 OH 0.070 110,000.00 7,700.00
Kepala tukang L.03 OH 0.007 120,000.00 840.00
Mandor L.04 OH 0.004 120,000.00 480.00
JUMLAH TENAGA KERJA 14,620.00
B BAHAN
Besi beton kg 10.500 14,950.00 156,975.00
(polos/ulir)
Kawat beton kg 0.150 40,250.00 6,037.50
JUMLAH HARGA BAHAN 163,012.50
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 177,632.50


E Overhead & Profit 15.00% 26,644.88
F Harga Satuan Pekerjaan (D+E) 204,277.38

A.4.1.1.18 Pemasangan 10 kg kabel prategang (prestressed) polos/strands

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)

III - 62
A TENAGA
Pekerja L.01 OH 0.050 80,000.00 4,000.00
Tukang besi L.02 OH 0.050 110,000.00 5,500.00
Kepala tukang L.03 OH 0.005 120,000.00 600.00
Mandor L.04 OH 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 10,460.00

III - 63
B BAHAN
Besi beton kg 10.500 14,950.00 156,975.00
(polos/ulir)
Kawat beton kg 0.100 40,250.00 4,025.00
JUMLAH HARGA BAHAN 161,000.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 171,460.00


E Overhead & Profit 15.00% 25,719.00
F Harga Satuan Pekerjaan (D+E) 197,179.00

A.4.1.1.19 Pemasangan 10 kg jaring kawat baja (wiremesh)

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.025 80,000.00 2,000.00
Tukang besi L.02 OH 0.025 110,000.00 2,750.00
Kepala tukang L.03 OH 0.025 120,000.00 3,000.00
Mandor L.04 OH 0.001 120,000.00 120.00
JUMLAH TENAGA KERJA 7,870.00
B BAHAN
Jaring kawat kg 10.200 10,580.00 107,916.00
baja dilas
Kawat beton kg 0.050 40,250.00 2,012.50
JUMLAH HARGA BAHAN 109,928.50
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 117,798.50


E Overhead & Profit 15.00% 17,669.78
F Harga Satuan Pekerjaan (D+E) 135,468.28

A.4.1.1.20 (K3) Pemasangan 1 m2 bekisting untuk pondasi

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.520 80,000.00 41,600.00
Tukang kayu L.02 OH 0.260 110,000.00 28,600.00
Kepala tukang L.03 OH 0.026 120,000.00 3,120.00
Mandor L.04 OH 0.026 120,000.00 3,120.00
JUMLAH TENAGA KERJA 76,440.00
B BAHAN
Kayu kelas III m3 0.040 4,025,000.00 161,000.00
Paku 5 – 10 cm kg 0.300 23,000.00 6,900.00
Minyak bekisting Liter 0.100 11,500.00 1,150.00
JUMLAH HARGA BAHAN 169,050.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 245,490.00
E Overhead & Profit 15.00% 36,823.50
F Harga Satuan Pekerjaan (D+E) 282,313.50

A.4.1.1.21 (K3) Pemasangan 1 m2 bekisting untuk sloof

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.520 80,000.00 41,600.00
Tukang kayu L.02 OH 0.260 110,000.00 28,600.00
Kepala tukang L.03 OH 0.026 120,000.00 3,120.00
Mandor L.04 OH 0.026 120,000.00 3,120.00
JUMLAH TENAGA KERJA 76,440.00
B BAHAN
Kayu kelas III m3 0.045 4,025,000.00 181,125.00
Paku 5 cm – 10 cm kg 0.300 23,000.00 6,900.00
Minyak bekisting Liter 0.100 11,500.00 1,150.00
JUMLAH HARGA BAHAN 189,175.00
C PERALATAN

III - 64
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 265,615.00


E Overhead & Profit 15.00% 39,842.25
F Harga Satuan Pekerjaan (D+E) 305,457.25

III - 65
A.4.1.1.22 (K3) Pemasangan 1 m2 bekisting untuk kolom

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.660 80,000.00 52,800.00
Tukang kayu L.02 OH 0.330 110,000.00 36,300.00
Kepala tukang L.03 OH 0.033 120,000.00 3,960.00
Mandor L.04 OH 0.033 120,000.00 3,960.00
JUMLAH TENAGA KERJA 97,020.00
B BAHAN
Kayu kelas III m3 0.040 4,025,000.00 161,000.00
Paku 5 cm – 12 cm kg 0.400 23,000.00 9,200.00
Minyak bekisting Liter 0.200 11,500.00 2,300.00
Balok kayu kelas II m3 0.015 5,750,000.00 86,250.00
Plywood tebal 9 Lbr 0.350 106,087.50 37,130.63
mm
Dolken kayu f 8- Batang 2.000 74,750.00 149,500.00
10cm –panj 4 m
JUMLAH HARGA BAHAN 445,380.63
C PERALATAN
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 542,400.63


E Overhead & Profit 15.00% 81,360.09
F Harga Satuan Pekerjaan (D+E) 623,760.72

A.4.1.1.23 (K3) Pemasangan 1 m2 bekisting untuk balok

Harga Satuan (Rp) Jumlah Harga (Rp)


No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 0.660 80,000.00 52,800.00
Tukang kayu L.02 OH 0.330 110,000.00 36,300.00
Kepala tukang L.03 OH 0.033 120,000.00 3,960.00
Mandor L.04 OH 0.033 120,000.00 3,960.00
JUMLAH TENAGA KERJA 97,020.00
B BAHAN
Kayu kelas III m3 0.040 4,025,000.00 161,000.00
Paku 5 cm – 12 cm kg 0.400 23,000.00 9,200.00
Minyak bekisting Liter 0.200 11,500.00 2,300.00
Balok kayu kelas II m3 0.018 5,750,000.00 103,500.00
Plywood tebal 9 mm Lbr 0.350 106,087.50 37,130.63
Dolken kayu 74,750.00 149,500.00
f (8–10) cm Batang 2.000
panjang 4 m
JUMLAH HARGA BAHAN 462,630.63
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 559,650.63
E Overhead & Profit 15.00% 83,947.59
F Harga Satuan Pekerjaan (D+E) 643,598.22

A.4.1.1.24 (K3) Pemasangan 1 m2 bekisting untuk lantai

Harga Satuan (Rp) Jumlah Harga (Rp)


No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 0.660 80,000.00 52,800.00
Tukang kayu L.02 OH 0.330 110,000.00 36,300.00
Kepala tukang L.03 OH 0.033 120,000.00 3,960.00
Mandor L.04 OH 0.033 120,000.00 3,960.00
JUMLAH TENAGA KERJA 97,020.00
B BAHAN
Kayu kelas III m3 0.040 4,025,000.00 161,000.00
Paku 5 cm – 12 cm kg 0.400 23,000.00 9,200.00
Minyak bekisting Liter 0.200 11,500.00 2,300.00
Balok kayu kelas II m3 0.015 5,750,000.00 86,250.00
Plywood tebal 9 mm Lbr 0.350 106,087.50 37,130.63
Dolken kayu galam, 74,750.00 448,500.00
(8–10) cm panjang Batang 6.000
4m
JUMLAH HARGA BAHAN 744,380.63
C PERALATAN

III - 66
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 841,400.63
E Overhead & Profit 15.00% 126,210.09
F Harga Satuan Pekerjaan (D+E) 967,610.72

III - 67
A.4.1.1.25 (K3) Pemasangan 1 m2 bekisting untuk dinding

Harga Satuan (Rp) Jumlah Harga (Rp)


No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 0.660 80,000.00 52,800.00
Tukang kayu L.02 OH 0.330 110,000.00 36,300.00
Kepala tukang L.03 OH 0.033 120,000.00 3,960.00
Mandor L.04 OH 0.033 120,000.00 3,960.00
JUMLAH TENAGA KERJA 97,020.00
B BAHAN
Kayu kelas III m3 0.030 4,025,000.00 120,750.00
Paku 5 cm – 12 cm kg 0.400 23,000.00 9,200.00
Minyak bekisting Liter 0.200 11,500.00 2,300.00
Balok kayu kelas II m3 0.020 5,750,000.00 115,000.00
Plywood tebal 9 mm Lbr 0.350 106,087.50 37,130.63
Dolken kayu , f 8– 74,750.00 224,250.00
Batang 3.000
10 cm, panj4 m
Penjaga jarak bekisting/spacer (dari 20,700.00 82,800.00
besi/baut) Buah 4.000

JUMLAH HARGA BAHAN 591,430.63


C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 688,450.63
E Overhead & Profit 15.00% 103,267.59
F Harga Satuan Pekerjaan (D+E) 791,718.22

A.4.1.1.26 (K3) Pemasangan 1 m2 bekisting untuk tangga

Harga Satuan (Rp) Jumlah Harga (Rp)


No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 0.660 80,000.00 52,800.00
Tukang kayu L.02 OH 0.330 110,000.00 36,300.00
Kepala tukang L.03 OH 0.033 120,000.00 3,960.00
Mandor L.04 OH 0.033 120,000.00 3,960.00
JUMLAH TENAGA KERJA 97,020.00
B BAHAN
Kayu kelas III m3 0.030 4,025,000.00 120,750.00
Paku 5 cm – 12 cm kg 0.400 23,000.00 9,200.00
Minyak bekisting Liter 0.150 11,500.00 1,725.00
Balok kayu kelas II m3 0.015 5,750,000.00 86,250.00
Plywood tebal 9 mm Lbr 0.350 106,087.50 37,130.63
Dolken kayu, Ø 8– 74,750.00 149,500.00
Batang 2.000
10 cm,panjang 4 m
JUMLAH HARGA BAHAN 404,555.63
C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 501,575.63
E Overhead & Profit 15.00% 75,236.34
F Harga Satuan Pekerjaan (D+E) 576,811.97

A.4.1.1.27 Pemasangan 1 m2 jembatan untuk pengecoran beton

Harga Satuan (Rp) Jumlah Harga (Rp)


No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 0.150 80,000.00 12,000.00
Tukang kayu L.02 OH 0.050 110,000.00 5,500.00
Kepala tukang L.03 OH 0.005 120,000.00 600.00
Mandor L.04 OH 0.008 120,000.00 960.00
JUMLAH TENAGA KERJA 19,060.00
B BAHAN
Kayu kelas III (papan) m3 0.026 4,025,000.00 106,260.00
Paku 5 cm – 12 cm kg 0.600 23,000.00 13,800.00
Dolken kayu , f 8–10 panjang 4m 74,750.00 37,375.00
Batang 0.500

JUMLAH HARGA BAHAN 157,435.00


C PERALATAN

JUMLAH HARGA ALAT -

III - 68
D Jumlah (A+B+C) 176,495.00
E Overhead & Profit 15.00% 26,474.25
F Harga Satuan Pekerjaan (D+E) 202,969.25

III - 69
A.4.1.1.35 Membuat 1 m’ kolom praktis beton bertulang (11 x 11) cm
Harga Satuan (Rp) Jumlah Harga (Rp)
No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 0.180 80,000.00 14,400.00
Tukang batu L.02 OH 0.020 110,000.00 2,200.00
Tukang kayu L.02 OH 0.020 110,000.00 2,200.00
Tukang besi L.02 OH 0.020 110,000.00 2,200.00
Kepala tukang L.03 OH 0.006 120,000.00 720.00
Mandor L.04 OH 0.009 120,000.00 1,080.00
JUMLAH TENAGA KERJA 22,800.00
B BAHAN
Kayu kelas III m3 0.002 4,025,000.00 8,050.00
Paku 5 cm – 12 cm kg 0.010 23,000.00 230.00
Besi beton polos kg 3.000 14,950.00 44,850.00
Kawat beton kg 0.450 40,250.00 18,112.50
Semen Portland kg 4.000 1,633.00 6,532.00
Pasir Beton m3 0.006 244,375.00 1,466.25
Kerikil m3 0.009 230,000.00 2,070.00
JUMLAH HARGA BAHAN 81,310.75
C PERALATAN
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 104,110.75


E Overhead & Profit 15.00% 15,616.61
F Harga Satuan Pekerjaan (D+E) 119,727.36

A.4.1.1.36 Membuat 1 m’ ring balok beton bertulang (10 x 15) cm


Harga Satuan (Rp) Jumlah Harga (Rp)
No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 0.297 80,000.00 23,760.00
Tukang batu L.02 OH 0.033 110,000.00 3,630.00
Tukang kayu L.02 OH 0.033 110,000.00 3,630.00
Tukang besi L.02 OH 0.033 110,000.00 3,630.00
Kepala tukang L.03 OH 0.010 120,000.00 1,200.00
Mandor L.04 OH 0.015 120,000.00 1,800.00
JUMLAH TENAGA KERJA 37,650.00
B BAHAN
Kayu kelas III m3 0.003 4,025,000.00 12,075.00
Paku 5 cm – 12 cm kg 0.020 23,000.00 460.00
Besi beton polos kg 3.600 14,950.00 53,820.00
Kawat beton kg 0.050 40,250.00 2,012.50
Semen Portland kg 5.500 1,633.00 8,981.50
Pasir beton m3 0.009 244,375.00 2,199.38
Kerikil m3 0.015 230,000.00 3,450.00
JUMLAH HARGA BAHAN 82,998.38
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 120,648.38
E Overhead & Profit 15.00% 18,097.26
F Harga Satuan Pekerjaan (D+E) 138,745.63

A.4.1.2 HARGA SATUAN PEKERJAAN BETON PRACETAK


Untuk produksi pracetak bisa dilakukan dipabrik (cor di plant) atau di lapangan (cast in place). Indeks yang ada dalam pedoman ini hanya untuk pekerjaan
produksi yang dilakukan di lapangan, terutama untuk analisa cetakan (bekisting) pracetak baik untuk komponen kolom, balok dan pelat.

A.4.1.2.1. (K3) Pembuatan 1 m2 lahan produksi tebal 8 cm beton f’c 14,5 MPa, slump (120 ± 20) mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.132 80,000.00 10,560.00
Tukang batu L.02 OH 0.022 110,000.00 2,420.00
Kepala tukang L.03 OH 0.002 120,000.00 240.00
Mandor L.04 OH 0.007 120,000.00 840.00
JUMLAH TENAGA KERJA 14,060.00
B BAHAN
Semen PC Kg 26.080 1,633.00 42,588.64
Pasir beton Kg 60.800 174.55 10,612.86
Kerikil (menggunakan bt. Pecah 2-3) Kg 82.320 255.56 21,037.33

Air L 17.200 75.00 1,290.00


JUMLAH HARGA BAHAN 75,528.83
C PERALATAN

III - 70
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 89,588.83


E Overhead & Profit 15.00% 13,438.32
F Harga Satuan Pekerjaan (D+E) 103,027.16

III - 71
A.4.1.2.2. (K3) Pembuatan 1 m2 lahan produksi tebal 10 cm beton f’c 14,5 MPa, slump (120 ± 20) mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.165 80,000.00 13,200.00
Tukang batu L.02 OH 0.028 110,000.00 3,080.00
Kepala tukang L.03 OH 0.003 120,000.00 360.00
Mandor L.04 OH 0.008 120,000.00 960.00
JUMLAH TENAGA KERJA 17,600.00
B BAHAN
Semen PC Kg 32.600 1,633.00 53,235.80
Pasir beton Kg 76.000 174.55 13,266.07
Kerikil (maks 30mm) Kg 102.900 255.56 26,296.67
Air L 21.500 75.00 1,612.50
JUMLAH HARGA BAHAN 94,411.04
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 112,011.04


E Overhead & Profit 15.00% 16,801.66
F Harga Satuan Pekerjaan (D+E) 128,812.69

A.4.1.2.3. (K3) Pembuatan 1 m2 lahan produksi tebal 12 cm beton f’c 14,5 MPa, slump (120 ± 20) mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.198 80,000.00 15,840.00
Tukang batu L.02 OH 0.033 110,000.00 3,630.00
Kepala tukang L.03 OH 0.003 120,000.00 360.00
Mandor L.04 OH 0.010 120,000.00 1,200.00
JUMLAH TENAGA KERJA 21,030.00
B BAHAN
Semen PC Kg 39.120 1,633.00 63,882.96
Pasir beton Kg 91.200 174.55 15,919.29
Kerikil (maks 30mm) Kg 123.480 255.56 31,556.00
Air L 25.800 75.00 1,935.00
JUMLAH HARGA BAHAN 113,293.25
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 134,323.25


E Overhead & Profit 15.00% 20,148.49
F Harga Satuan Pekerjaan (D+E) 154,471.73

A.4.1.2.4. (K3) Pembuatan 1 m2 lahan produksi tebal 15 cm beton f’c 14,5 MPa, slump (120 ± 20) mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.248 80,000.00 19,840.00
Tukang batu L.02 OH 0.041 110,000.00 4,510.00
Kepala tukang L.03 OH 0.004 120,000.00 480.00
Mandor L.04 OH 0.013 120,000.00 1,560.00
JUMLAH TENAGA KERJA 26,390.00
B BAHAN
Semen PC Kg 48.900 1,633.00 79,853.70
Pasir beton Kg 114.000 174.55 19,899.11
Kerikil (maks 30 mm) Kg 154.350 255.56 39,445.00
Air L 32.250 75.00 2,418.75
JUMLAH HARGA BAHAN 141,616.56
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 168,006.56
E Overhead & Profit 15.00% 25,200.98
F Harga Satuan Pekerjaan (D+E) 193,207.54

III - 72
A.4.1.2.5. Pembuatan 1 m2 bekisting untuk pelat beton pracetak ( 5 kali pakai)

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.007 80,000.00 560.00
Tukang kayu L.02 OH 0.076 110,000.00 8,360.00
Kepala tukang L.03 OH 0.008 120,000.00 960.00
Mandor L.04 OH 0.001 120,000.00 120.00
JUMLAH TENAGA KERJA 10,000.00
B BAHAN
Lantai kerja t=10cm m3 0.008 976,392.22 7,811.14
Besi hollow (50 x 50 8,625.00 81,023.25
Kg 9.394
x 3) mm
Kayu kaso 5/7 (lebar 5 cm, tinggi 7 5,750,000.00 28,750.00
m3 0.005
cm)
Phenol film 12 mm Lbr 0.080 281,750.00 22,540.00
Minyak cetakan
L 0.200 11,500.00 2,300.00
(bekisting)
Dinabolt Ø 12mm
buah 3.882 2,990.00 11,607.18
(10 s.d.15 cm)
JUMLAH HARGA BAHAN 154,031.57
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 164,031.57
E Overhead & Profit 15.00% 24,604.74
F Harga Satuan Pekerjaan (D+E) 188,636.30

A.4.1.2.6 Pembuatan 1 m2 bekisting untuk balok beton pracetak (10-12 kali pakai)

Harga Satuan (Rp) Jumlah Harga (Rp)


No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 0.004 80,000.00 320.00
Tukang kayu L.02 OH 0.038 110,000.00 4,180.00
Kepala tukang L.03 OH 0.004 120,000.00 480.00
Mandor L.04 OH 0.001 120,000.00 120.00
JUMLAH TENAGA KERJA 5,100.00
B BAHAN
Kayu kaso 5/7 (lebar 5 cm, tinggi 7 m3 0.005 5,750,000.00 28,750.00
cm)
Phenol film 12 mm Lbr 0.043 281,750.00 12,115.25
Minyak cetakan L 0.200 11,500.00 2,300.00
(bekisting)
Paku (5 s.d.7) cm kg 0.046 23,000.00 1,058.00
Dinabolt Ø 12 mm buah 0.693 2,990.00 2,072.07
(10 s.d.15 cm)
JUMLAH HARGA BAHAN 46,295.32
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 51,395.32
E Overhead & Profit 15.00% 7,709.30
F Harga Satuan Pekerjaan (D+E) 59,104.62

A.4.1.2.7. Pembuatan 1 m2 bekisting untuk kolom beton pracetak (10-12 kali pakai)

Harga Satuan (Rp) Jumlah Harga (Rp)


No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 0.004 80,000.00 320.00
Tukang kayu L.02 OH 0.038 110,000.00 4,180.00
Kepala tukang L.03 OH 0.004 120,000.00 480.00
Mandor L.04 OH 0.001 120,000.00 120.00
JUMLAH TENAGA KERJA 5,100.00
B BAHAN
Kayu kaso 5/7 (lebar 5 m3 0.004 5,750,000.00 23,000.00
cm, tinggi 7 cm)
Phenol film 12 mm Lbr 0.048 281,750.00 13,524.00
Minyak cetakan L 0.200 11,500.00 2,300.00
(bekisting)
Paku (5 s.d.7) cm Kg 0.046 23,000.00 1,058.00
Dinabolt Ø 12 mm buah 0.693 2,990.00 2,072.07
(10-15cm)
JUMLAH HARGA BAHAN 41,954.07
C PERALATAN

III - 73
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 47,054.07
E Overhead & Profit 15.00% 7,058.11
F Harga Satuan Pekerjaan (D+E) 54,112.18

III - 74
A.4.1.2.8.
Pemasangan dan membuka bekisting 1 buah komponen pelat beton pracetak

Harga Satuan (Rp) Jumlah Harga (Rp)


No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 0.053 80,000.00 4,240.00
Tukang kayu L.02 OH 0.018 110,000.00 1,980.00
Mandor L.04 OH 0.005 120,000.00 600.00
JUMLAH TENAGA KERJA 6,820.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 6,820.00
E Overhead & Profit 15.00% 1,023.00
F Harga Satuan Pekerjaan (D+E) 7,843.00

A.4.1.2.9. Pemasangan dan membuka bekisting 1 buah komponen balok beton pracetak

Harga Satuan (Rp) Jumlah Harga (Rp)


No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 0.089 80,000.00 7,120.00
Tukang kayu L.02 OH 0.030 110,000.00 3,300.00
Mandor L.04 OH 0.005 120,000.00 600.00
JUMLAH TENAGA KERJA 11,020.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 11,020.00
E Overhead & Profit 15.00% 1,653.00
F Harga Satuan Pekerjaan (D+E) 12,673.00

A.4.1.2.10. Pemasangan dan membuka bekisting 1 buah komponen kolom beton pracetak

Harga Satuan (Rp) Jumlah Harga (Rp)


No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 0.071 80,000.00 5,680.00
Tukang kayu L.02 OH 0.024 110,000.00 2,640.00
Mandor L.04 OH 0.005 120,000.00 600.00
JUMLAH TENAGA KERJA 8,920.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 8,920.00
E Overhead & Profit 15.00% 1,338.00
F Harga Satuan Pekerjaan (D+E) 10,258.00

A.4.1.2.11. Penuangan/menebar beton 1 m3 komponen untuk pelat pracetak

Harga Satuan (Rp) Jumlah Harga (Rp)


No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 0.064 80,000.00 5,120.00
Tukang batu L.02 OH 0.244 110,000.00 26,840.00
Tukang vibrator L.02 OH 0.128 110,000.00 14,080.00
Kepala tukang L.03 OH 0.034 120,000.00 4,080.00
Mandor L.04 OH 0.073 120,000.00 8,760.00
JUMLAH TENAGA KERJA 58,880.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 58,880.00
E Overhead & Profit 15.00% 8,832.00

III - 75
F Harga Satuan Pekerjaan (D+E) 67,712.00

III - 76
A.4.1.2.12. Penuangan/menebar beton 1 m3 komponen untuk balok pracetak

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.069 80,000.00 5,520.00
Tukang batu L.02 OH 0.242 110,000.00 26,620.00
Tukang vibrator L.02 OH 0.138 110,000.00 15,180.00
Kepala tukang L.03 OH 0.037 120,000.00 4,440.00
Mandor L.04 OH 0.073 120,000.00 8,760.00
JUMLAH TENAGA KERJA 60,520.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 60,520.00


E Overhead & Profit 15.00% 9,078.00
F Harga Satuan Pekerjaan (D+E) 69,598.00

A.4.1.2.13. Penuangan/menebar beton 1 m3 komponen kolom pracetak

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.061 80,000.00 4,880.00
Tukang batu L.02 OH 0.213 110,000.00 23,430.00
Tukang vibrator L.02 OH 0.122 110,000.00 13,420.00
Kepala tukang L.03 OH 0.033 120,000.00 3,960.00
Mandor/Supervisor/ L.04 OH 0.073 120,000.00 8,760.00
Penyelia
JUMLAH TENAGA KERJA 54,450.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 54,450.00


E Overhead & Profit 15.00% 8,167.50
F Harga Satuan Pekerjaan (D+E) 62,617.50

A.4.1.2.14. Ereksi 1 buah komponen untuk pelat pracetak

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Operator crane L.08 OH 0.067 140,000.00 9,380.00
Pembantu operator 80,000.00 5,360.00
L.09 OH 0.067
crane
Pekerja L.01 OH 0.067 80,000.00 5,360.00
Tukang batu L.02 OH 0.067 110,000.00 7,370.00
Tukang ereksi L.02 OH 0.134 110,000.00 14,740.00
Kepala tukang L.03 OH 0.067 120,000.00 8,040.00
Mandor L.04 OH 0.067 120,000.00 8,040.00
JUMLAH TENAGA KERJA 58,290.00
B BAHAN
Solar L 6.676 7,072.50 47,216.01
JUMLAH HARGA BAHAN 47,216.01
C PERALATAN
Sewa crane unit hari 0.067 4,485,000.00 300,495.00
Sewa pipe support buah 1.100 341,550.00 375,705.00
hari
JUMLAH HARGA ALAT 676,200.00

D Jumlah (A+B+C) 781,706.01


E Overhead & Profit 15.00% 117,255.90
F Harga Satuan Pekerjaan (D+E) 898,961.91

III - 77
Indeks kenaikan lantai ereksi komponen untuk pelat pracetak
Indeks kenaikan lantai Indeks
La ereksi pelat Lantai kenaikan
nta lantai
i ereksi
pelat
1 1 13 1.114
2 1 14 1.134
3 1 15 1.155
4 1 16 1.176
5 1 17 1.197
6 1 18 1.219
7 1 19 1.241
8 1.018 20 1.264
9 1.037 21 1.287
10 1.055 22 1.310
11 1.075 23 1.334
12 1.094 24 1.358

A.4.1.2.15. Ereksi 1 buah komponen untuk balok pracetak

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Operator crane L.08 OH 0.061 140,000.00 8,540.00
Pembantu operator crane L.09 OH 0.061 80,000.00 4,880.00
Pekerja L.01 OH 0.061 80,000.00 4,880.00
Tukang batu L.02 OH 0.061 110,000.00 6,710.00
Tukang ereksi L.02 OH 0.122 110,000.00 13,420.00
Kepala tukang L.03 OH 0.061 120,000.00 7,320.00
Mandor L.04 OH 0.061 120,000.00 7,320.00
JUMLAH TENAGA KERJA 53,070.00
B BAHAN
Solar L 6.110 7,072.50 43,212.98
JUMLAH HARGA BAHAN 43,212.98
C PERALATAN
Sewa crane unit 0.061 4,485,000.00 273,585.00
hari
Sewa scaffolding unit 1.100 341,550.00 375,705.00
hari
JUMLAH HARGA ALAT 649,290.00

D Jumlah (A+B+C) 745,572.98


E Overhead & Profit 15.00% 111,835.95
F Harga Satuan Pekerjaan (D+E) 857,408.92

Indeks kenaikan lantai ereksi komponen untuk balok pracetak


Indeks kenaikan lantai Indeks
La ereksi balok Lantai kenaikan
nta lantai
i ereksi
balok
1 1 13 1.068
2 1 14 1.080
3 1 15 1.092
4 1 16 1.104
5 1 17 1.116
6 1 18 1.129
7 1 19 1.141
8 1.011 20 1.154
9 1.022 21 1.166
10 1.034 22 1.179
11 1.045 23 1.192
12 1.057 24 1.206

A.4.1.2.16. Ereksi 1 buah komponen untuk kolom pracetak

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Operator crane L.08 OH 0.083 140,000.00 11,620.00
Pembantu operator L.09 OH 0.083 80,000.00 6,640.00
crane
Pekerja L.01 OH 0.083 80,000.00 6,640.00

III - 78
Tukang batu L.02 OH 0.083 110,000.00 9,130.00
Tukang ereksi L.02 OH 0.166 110,000.00 18,260.00
Kepala tukang L.03 OH 0.083 120,000.00 9,960.00
Mandor L.04 OH 0.083 120,000.00 9,960.00
JUMLAH TENAGA KERJA 72,210.00

III - 79
B BAHAN
Solar L 8.277 7,072.50 58,539.08
JUMLAH HARGA BAHAN 58,539.08
C PERALATAN
Sewa crane unit hari 0.083 4,485,000.00 372,255.00
Sewa pipe support buah hari 2.200 341,550.00 751,410.00
JUMLAH HARGA ALAT 1,123,665.00

D Jumlah (A+B+C) 1,254,414.08


E Overhead & Profit 15.00% 188,162.11
F Harga Satuan Pekerjaan (D+E) 1,442,576.19

Indeks kenaikan lantai ereksi komponen untuk kolom pracetak


Indeks kenaikan lantai Indeks
Lanta ereksi kolom Lantai kenaikan
i lantai ereksi
kolom
1 1 13 1.162
2 1 14 1.191
3 1 15 1.221
4 1 16 1.252
5 1 17 1.284
6 1 18 1.317
7 1 19 1.350
8 1.025 20 1.384
9 1.051 21 1.419
10 1.078 22 1.455
11 1.105 23 1.492
12 1.133 24 1.530

A.4.1.2.17. Langsir 1 buah komponen untuk pelat pracetak ( ± 20 m)

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Operator crane L.08 OH 0.019 140,000.00 2,660.00
Pembantu operator L.09 OH 0.019 80,000.00 1,520.00
crane
Pekerja L.01 OH 0.019 80,000.00 1,520.00
Tukang batu L.02 OH 0.038 110,000.00 4,180.00
JUMLAH TENAGA KERJA 9,880.00
B BAHAN
Solar L 1.897 7,072.50 13,416.53
JUMLAH HARGA BAHAN 13,416.53
C PERALATAN
Sewa crane unit hari 0.019 4,485,000.00 85,215.00
JUMLAH HARGA ALAT 85,215.00

D Jumlah (A+B+C) 108,511.53


E Overhead & Profit 15.00% 16,276.73
F Harga Satuan Pekerjaan (D+E) 124,788.26

A.4.1.2.18. Langsir 1 buah komponen untuk balok pracetak ( ± 20 m)

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Operator crane L.08 OH 0.019 140,000.00 2,660.00
Pembantu operator
L.09 OH 0.019 80,000.00 1,520.00
crane
Pekerja L.01 OH 0.019 80,000.00 1,520.00
Tukang batu L.02 OH 0.038 110,000.00 4,180.00
JUMLAH TENAGA KERJA 9,880.00
B BAHAN
Solar L 1.897 7,072.50 13,416.53
JUMLAH HARGA BAHAN 13,416.53
C PERALATAN
Sewa crane unit hari 0.019 4,485,000.00 85,215.00
JUMLAH HARGA ALAT 85,215.00

D Jumlah (A+B+C) 108,511.53


E Overhead & Profit 15.00% 16,276.73
F Harga Satuan Pekerjaan (D+E) 124,788.26

III - 80
A.4.1.2.19. Langsir 1 buah komponen untuk kolom pracetak ( ± 20 m)

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Operator crane L.08 OH 0.019 140,000.00 2,660.00
Pembantu operator L.09 OH 0.019 80,000.00 1,520.00
crane
Pekerja L.01 OH 0.019 80,000.00 1,520.00
Tukang batu L.02 OH 0.038 110,000.00 4,180.00
JUMLAH TENAGA KERJA 9,880.00
B BAHAN
Solar L 1.897 7,072.50 13,416.53
JUMLAH HARGA BAHAN 13,416.53
C PERALATAN
Sewa crane unit hari 0.019 4,485,000.00 85,215.00
JUMLAH HARGA ALAT 85,215.00

D Jumlah (A+B+C) 108,511.53


E Overhead & Profit 15.00% 16,276.73
F Harga Satuan Pekerjaan (D+E) 124,788.26

A.4.1.2.20. Bahan 1 m3 grout campuran

Jumlah Harga (Rp)


No Uraian Kode Satuan Koefisien Harga Satuan
(Rp)
A TENAGA
JUMLAH TENAGA KERJA -
B BAHAN
Semen grout Kg 1,200.000 2,760.00 3,312,000.00
Screening Kg 650.000 172.50 112,125.00
Air L 350.000 75.00 26,250.00
JUMLAH HARGA BAHAN 3,450,375.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 3,450,375.00


E Overhead & Profit 15.00% 517,556.25
F Harga Satuan Pekerjaan (D+E) 3,967,931.25

A.4.1.2.21. Bahan 1 m3 grout (tidak campuran)

Jumlah Harga (Rp)


No Uraian Kode Satuan Koefisien Harga Satuan
(Rp)
A TENAGA
JUMLAH TENAGA KERJA -
B BAHAN
Semen grout Kg 1,850.000 2,760.00 5,106,000.00
Air L 400.00 75.00 30,000.00
JUMLAH HARGA BAHAN 5,136,000.00
C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 5,136,000.00
E Overhead & Profit 15.00% 770,400.00
F Harga Satuan Pekerjaan (D+E) 5,906,400.00

A.4.1.2.22. Upah 1 titik pekerjaan grout pada joint beton pracetak

Jumlah Harga (Rp)


No Uraian Kode Satuan Koefisien Harga Satuan
(Rp)
A TENAGA
Tukang batu L.02 OH 0.367 110,000.00 40,370.00
Kepala tukang L.03 OH 0.074 120,000.00 8,880.00
Mandor L.04 OH 0.037 120,000.00 4,440.00
JUMLAH TENAGA KERJA 53,690.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN

III - 81
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 53,690.00


E Overhead & Profit 15.00% 8,053.50
F Harga Satuan Pekerjaan (D+E) 61,743.50

III - 82
A.4.1.2.23. Pemasangan 1 titik bekisting joint pracetak

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.147 80,000.00 11,760.00
Tukang kayu L.02 OH 0.147 110,000.00 16,170.00
Kepala tukang L.03 OH 0.015 120,000.00 1,800.00
Mandor L.04 OH 0.005 120,000.00 600.00
JUMLAH TENAGA KERJA 30,330.00
B BAHAN
Kayu kaso 5/7 (lebar m3 0.012 5,750,000.00 69,000.00
5 cm, tinggi 7 cm)
Papan cor (kayu kelas II) m3 0.004 5,750,000.00 23,000.00
Paku (5 s.d.7) cm Kg 0.264 23,000.00 6,072.00
JUMLAH HARGA BAHAN 98,072.00
C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 128,402.00
E Overhead & Profit 15.00% 19,260.30
F Harga Satuan Pekerjaan (D+E) 147,662.30

A.4.1.2.24. Upah 1 titik joint dengan sling

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.220 80,000.00 17,600.00
Tukang kayu L.02 OH 0.022 110,000.00 2,420.00
Tukang besi L.02 OH 0.220 110,000.00 24,200.00
Mandor L.04 OH 0.011 120,000.00 1,320.00
JUMLAH TENAGA KERJA 45,540.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 45,540.00


E Overhead & Profit 15.00% 6,831.00
F Harga Satuan Pekerjaan (D+E) 52,371.00

A.4.2.1 HARGA SATUAN PEKERJAAN BESI DAN ALUMUNIUM

A.4.2.1.1. Pemasangan 1 kg besi profil

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.060 80,000.00 4,800.00
Tukang las L.03 OH 0.060 110,000.00 6,600.00
konstruksi
Kepala tukang L.03 OH 0.006 120,000.00 720.00
Mandor L.04 OH 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 12,480.00
B BAHAN
Besi Profil Kg 1.150 16,100.00 18,515.00
JUMLAH HARGA BAHAN 18,515.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 30,995.00


E Overhead & Profit 15.00% 4,649.25
F Harga Satuan Pekerjaan (D+E) 35,644.25

III - 83
A.4.2.1.2. Pemasangan 1 kg rangka kuda-kuda baja IWF
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.060 80,000.00 4,800.00
Tukang las L.03 OH 0.060 110,000.00 6,600.00
konstruksi
Kepala tukang L.03 OH 0.006 120,000.00 720.00
Mandor L.04 OH 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 12,480.00
B BAHAN
Besi baja IWF Kg 1.150 16,100.00 18,515.00
JUMLAH HARGA BAHAN 18,515.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 30,995.00


E Overhead & Profit 15.00% 4,649.25
F Harga Satuan Pekerjaan (D+E) 35,644.25

A.4.2.1.3. Pengerjaan 100 kg pekerjaan perakitan


Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.100 80,000.00 8,000.00
Tukang besi L.03 OH 0.100 110,000.00 11,000.00
konstruksi
Kepala tukang L.03 OH 0.001 120,000.00 120.00
Mandor L.04 OH 0.005 120,000.00 600.00
JUMLAH TENAGA KERJA 19,720.00
B BAHAN
Solar Liter 1.000 7,072.50 7,072.50
Minyak pelumas Liter 0.100 11,500.00 1,150.00
JUMLAH HARGA BAHAN 8,222.50
C PERALATAN
1. Sewa alat Jam 0.800 132,250.00 105,800.00
JUMLAH HARGA ALAT 105,800.00

D Jumlah (A+B+C) 133,742.50


E Overhead & Profit 15.00% 20,061.38
F Harga Satuan Pekerjaan (D+E) 153,803.88

A.4.2.1.4. Pembuatan 1 m2 pintu besi pelat baja tebal 2 mm rangkap, rangka baja siku
Harga Satuan (Rp) Jumlah Harga (Rp)
No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 1.050 80,000.00 84,000.00
Tukang las biasa L.03 OH 1.050 110,000.00 115,500.00
Kepala tukang L.03 OH 0.105 120,000.00 12,600.00
Mandor L.04 OH 0.052 120,000.00 6,240.00
JUMLAH TENAGA KERJA 218,340.00
B BAHAN
Besi siku L 30.30.3 Kg 15.000 12,075.00 181,125.00
Besi pelat baja Kg 32.800 7,475.00 245,180.00
Kawat las Kg 0.050 31,050.00 1,552.50
JUMLAH HARGA BAHAN 427,857.50
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 646,197.50


E Overhead & Profit 15.00% 96,929.63
F Harga Satuan Pekerjaan (D+E) 743,127.13

A.4.2.1.5. Pengerjaan 10 cm pengelasan dengan las listrik


Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.040 80,000.00 3,200.00
Tukang las (bersertifikat) L.03 OH 0.020 120,000.00 2,400.00

Kepala tukang L.03 OH 0.002 120,000.00 240.00

III - 84
Mandor L.04 OH 0.002 120,000.00 240.00
JUMLAH TENAGA KERJA 6,080.00

III - 85
B BAHAN
Kawat las listrik Kg 0.400 31,050.00 12,420.00
Solar Liter 0.300 7,072.50 2,121.75
Minyak pelumas Liter 0.040 11,500.00 460.00
JUMLAH HARGA BAHAN 15,001.75
C PERALATAN
Sewa alat Jam 0.170 132,250.00 22,482.50
JUMLAH HARGA ALAT 22,482.50

D Jumlah (A+B+C) 43,564.25


E Overhead & Profit 15.00% 6,534.64
F Harga Satuan Pekerjaan (D+E) 50,098.89

A.4.2.1.6. Pembuatan 1 m2 rangka jendela besi scuare tube

Harga Satuan (Rp) Jumlah Harga (Rp)


No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 0.650 80,000.00 52,000.00
Tukang las biasa L.03 OH 0.650 110,000.00 71,500.00
Kepala tukang L.03 OH 0.065 120,000.00 7,800.00
Mandor L.04 OH 0.032 120,000.00 3,840.00
JUMLAH TENAGA KERJA 135,140.00
B BAHAN
Besi scuare tube m 4.760 21,850.00 104,006.00
Besi lis kaca (1 x 1) cm m 4.522 16,445.00 74,364.29
Pengelasan cm 20.000 5,060.00 101,200.00
JUMLAH HARGA BAHAN 279,570.29
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 414,710.29


E Overhead & Profit 15.00% 62,206.54
F Harga Satuan Pekerjaan (D+E) 476,916.83

A.4.2.1.7. Pemasangan 1 m2 pintu rolling door besi

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.200 80,000.00 96,000.00
Tukang las biasa L.03 OH 1.200 110,000.00 132,000.00
Kepala tukang L.03 OH 0.120 120,000.00 14,400.00
Mandor L.04 OH 0.006 120,000.00 720.00
JUMLAH TENAGA KERJA 243,120.00
B BAHAN
Pintu gulung besi m2 1.000 1,122,400.00 1,122,400.00
JUMLAH HARGA BAHAN 1,122,400.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 1,365,520.00


E Overhead & Profit 15.00% 204,828.00
F Harga Satuan Pekerjaan (D+E) 1,570,348.00

A.4.2.1.8. Pemasangan 1 m2 pintu lipat (folding door) bahan plastik/PVC

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.440 80,000.00 35,200.00
Tukang L.03 OH 0.440 110,000.00 48,400.00
Kepala tukang L.03 OH 0.044 120,000.00 5,280.00
Mandor L.04 OH 0.022 120,000.00 2,640.00
JUMLAH TENAGA KERJA 91,520.00
B BAHAN
Pintu lipat m2 1.000 3,116,500.00 3,116,500.00
JUMLAH HARGA BAHAN 3,116,500.00
C PERALATAN

JUMLAH HARGA ALAT -

III - 86
D Jumlah (A+B+C) 3,208,020.00
E Overhead & Profit 15.00% 481,203.00
F Harga Satuan Pekerjaan (D+E) 3,689,223.00

III - 87
A.4.2.1.9. Pemasangan 1 m2 sunscreen alluminium

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.080 80,000.00 6,400.00
Tukang L.03 OH 0.800 110,000.00 88,000.00
Kepala tukang L.03 OH 0.080 120,000.00 9,600.00
Mandor L.04 OH 0.004 120,000.00 480.00
JUMLAH TENAGA KERJA 104,480.00
B BAHAN
Sunscreen alluminium m2 1.000 442,750.00 442,750.00
JUMLAH HARGA BAHAN 442,750.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 547,230.00


E Overhead & Profit 15.00% 82,084.50
F Harga Satuan Pekerjaan (D+E) 629,314.50

A.4.2.1.10. Pemasangan 1 m2 rolling door alluminium

Harga Satuan (Rp) Jumlah Harga (Rp)


No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 1.000 80,000.00 80,000.00
Tukang khusus L.03 OH 1.000 110,000.00 110,000.00
alumunium
Kepala tukang L.03 OH 0.100 120,000.00 12,000.00
Mandor L.04 OH 0.050 120,000.00 6,000.00
JUMLAH TENAGA KERJA 208,000.00
B BAHAN
Rolling door alluminium m2 1.000 460,000.00 460,000.00
JUMLAH HARGA BAHAN 460,000.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 668,000.00


E Overhead & Profit 15.00% 100,200.00
F Harga Satuan Pekerjaan (D+E) 768,200.00

A.4.2.1.12. Pemasangan 1 m2 pintu alluminium strip lebar 8 cm

Harga Satuan (Rp) Jumlah Harga (Rp)


No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 0.085 80,000.00 6,800.00
Tukang khusus L.03 OH 0.085 110,000.00 9,350.00
alumunium
Kepala tukang L.03 OH 0.009 120,000.00 1,020.00
Mandor L.04 OH 0.004 120,000.00 504.00
JUMLAH TENAGA KERJA 17,674.00
B BAHAN
Profil alluminium m 4.400 126,500.00 556,600.00
Alluminium strip m 14.600 115,000.00 1,679,000.00
JUMLAH HARGA BAHAN 2,235,600.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 2,253,274.00


E Overhead & Profit 15.00% 337,991.10
F Harga Satuan Pekerjaan (D+E) 2,591,265.10

A.4.2.1.13. Pemasangan 1 m2 pintu kaca rangka alluminium

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.085 80,000.00 6,800.00

III - 88
Tukang khusus L.03 OH 0.085 110,000.00 9,350.00
alumunium
Kepala tukang L.03 OH 0.009 120,000.00 1,080.00
Mandor L.04 OH 0.005 120,000.00 600.00
JUMLAH TENAGA KERJA 17,830.00

III - 89
B BAHAN
Pintu alluminium m 4.400 126,500.00 556,600.00
Profil kaca m 4.500 14,260.00 64,170.00
Sealant Tube 0.270 23,000.00 6,210.00
JUMLAH HARGA BAHAN 626,980.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 644,810.00


E Overhead & Profit 15.00% 96,721.50
F Harga Satuan Pekerjaan (D+E) 741,531.50

A.4.2.1.14. Pemasangan 1 m2 venetions blinds dan vertical blinds

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.350 80,000.00 28,000.00
Tukang L.03 OH 0.350 110,000.00 38,500.00
Kepala tukang L.03 OH 0.035 120,000.00 4,200.00
Mandor L.04 OH 0.018 120,000.00 2,160.00
JUMLAH TENAGA KERJA 72,860.00
B BAHAN
Venetions blinds dan m2 1.000 122,130.00 122,130.00
vertical blinds (tirai)
JUMLAH HARGA BAHAN 122,130.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 194,990.00


E Overhead & Profit 15.00% 29,248.50
F Harga Satuan Pekerjaan (D+E) 224,238.50

A.4.2.1.15. Pemasangan 1 m2 terali besi strip (2 x 3) mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.670 80,000.00 133,600.00
Tukang las L.03 OH 1.670 110,000.00 183,700.00
Kepala tukang L.03 OH 0.167 120,000.00 20,040.00
Mandor L.04 OH 0.083 120,000.00 9,960.00
JUMLAH TENAGA KERJA 347,300.00
B BAHAN
Besi strip kg 6.177 15,812.50 97,673.81
Pengelasan cm 27.080 5,060.00 137,024.80
JUMLAH HARGA BAHAN 234,698.61
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 581,998.61


E Overhead & Profit 15.00% 87,299.79
F Harga Satuan Pekerjaan (D+E) 669,298.40

A.4.2.1.16. Pemasangan 1 m2 kawat nyamuk

Harga Satuan (Rp) Jumlah Harga (Rp)


No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 0.100 80,000.00 8,000.00
Tukang L.03 OH 0.100 110,000.00 11,000.00
Kepala tukang L.03 OH 0.010 120,000.00 1,200.00
Mandor L.04 OH 0.005 120,000.00 600.00
JUMLAH TENAGA KERJA 20,800.00
B BAHAN
Kawat nyamuk m2 1.100 287,500.00 316,250.00
Pengelasan cm 11.110 5,060.00 56,216.60
Baja strip (0,2 x 2) cm kg 1.716 20,872.50 35,817.21
JUMLAH HARGA BAHAN 408,283.81
C PERALATAN

III - 90
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 429,083.81


E Overhead & Profit 15.00% 64,362.57
F Harga Satuan Pekerjaan (D+E) 493,446.38

III - 91
A.4.2.1.17. Pemasangan 1 m2 jendela nako & tralis

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.200 80,000.00 16,000.00
Tukang L.03 OH 0.200 110,000.00 22,000.00
Kepala tukang L.03 OH 0.020 120,000.00 2,400.00
Mandor L.04 OH 0.001 120,000.00 120.00
JUMLAH TENAGA KERJA 40,520.00
B BAHAN
Jendela nako m2 1.100 187,680.00 206,448.00
(rangka + kaca 5 mm)
Paku skrup buah 10.000 460.00 4,600.00
1 cm – 2,5 cm
Besi strip m 7.000 15,812.50 110,687.50
JUMLAH HARGA BAHAN 321,735.50
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 362,255.50


E Overhead & Profit 15.00% 54,338.33
F Harga Satuan Pekerjaan (D+E) 416,593.83

A.4.2.1.18. Pemasangan 1 m’ talang datar/ jurai seng bjls 28 lebar 90 cm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.200 80,000.00 16,000.00
Tukang L.03 OH 0.200 110,000.00 22,000.00
Kepala tukang L.03 OH 0.020 120,000.00 2,400.00
Mandor L.04 OH 0.001 120,000.00 120.00
JUMLAH TENAGA KERJA 40,520.00
B BAHAN
Seng pelat m 1.050 43,700.00 45,885.00
Paku 1 cm - 2,5 cm kg 0.015 23,000.00 345.00
Papan kayu kelas II
m3 0.019 4,025,000.00 76,475.00
atau III
JUMLAH HARGA BAHAN 122,705.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 163,225.00


E Overhead & Profit 15.00% 24,483.75
F Harga Satuan Pekerjaan (D+E) 187,708.75

A.4.2.1.19 Pemasangan 1 m talang ½ lingkaran D-15 cm, seng pelat bjls 30 lebar 45 cm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.150 80,000.00 12,000.00
Tukang L.03 OH 0.300 110,000.00 33,000.00
Kepala tukang L.03 OH 0.030 120,000.00 3,600.00
Mandor L.04 OH 0.008 120,000.00 960.00
JUMLAH TENAGA KERJA 49,560.00
B BAHAN
Seng pelat m 1.050 43,700.00 45,885.00
Paku 1 cm – 2,5 cm kg 0.010 23,000.00 230.00
Besi strip kg 0.500 15,812.50 7,906.25
JUMLAH HARGA BAHAN 54,021.25
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 103,581.25


E Overhead & Profit 15.00% 15,537.19

III - 92
F Harga Satuan Pekerjaan (D+E) 119,118.44

III - 93
A.4.2.1.20. Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x 120 cm, untuk partisi

No Uraian Kode Satuan Koefisien Harga Jumlah


Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.250 80,000.00 20,000.00
Tukang besi L.02 OH 0.250 110,000.00 27,500.00
Kepala tukang L.03 OH 0.025 120,000.00 3,000.00
Mandor L.04 OH 0.013 120,000.00 1,560.00
JUMLAH TENAGA KERJA 52,060.00
B BAHAN
Rangka metal M1 3.500 21,850.00 76,475.00
hollow 40.40.2 mm
Assesoris Ls 1.000 76,475.00 76,475.00
(perkuatan, las dll)
JUMLAH HARGA BAHAN 152,950.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 205,010.00


E Overhead & Profit 15.00% 30,751.50
F Harga Satuan Pekerjaan (D+E) 235,761.50

A.4.2.1.21. Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x 60 cm, untuk plafon

No Uraian Kode Satuan Koefisien Harga Jumlah


Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.350 80,000.00 28,000.00
Tukang besi L.02 OH 0.350 110,000.00 38,500.00
Kepala tukang L.03 OH 0.035 120,000.00 4,200.00
Mandor L.04 OH 0.018 120,000.00 2,160.00
JUMLAH TENAGA KERJA 72,860.00
B BAHAN
Rangka metal M1 4.000 21,850.00 87,400.00
hollow 40.40.2 mm
Assesoris 87,400.00 87,400.00
(perkuatan, las Ls 100%xrangka
dll)
JUMLAH HARGA BAHAN 174,800.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 247,660.00


E Overhead & Profit 15.00% 37,149.00
F Harga Satuan Pekerjaan (D+E) 284,809.00

A.4.2.1.22. (K3) Pemasangan 1 m2 atap pelana rangka atap baja canai dingin profil C75

No Uraian Kode Satuan Koefisien Harga Jumlah


Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.734 80,000.00 58,720.00
Tukang besi L.02 OH 0.734 110,000.00 80,740.00
Kepala tukang L.03 OH 0.073 120,000.00 8,760.00
Mandor L.04 OH 0.037 120,000.00 4,440.00
JUMLAH TENAGA KERJA 152,660.00
B BAHAN
Baja ringan canai dingin C75 kg 3.065 16,100.00 49,346.50
JUMLAH HARGA BAHAN 49,346.50
C PERALATAN
Peralatan % 0.100 49,346.50 4,934.65
JUMLAH HARGA ALAT 4,934.65

D Jumlah (A+B+C) 206,941.15


E Overhead & Profit 15.00% 31,041.17
F Harga Satuan Pekerjaan (D+E) 237,982.32

III - 94
A.4.2.1.22. (K3) Pemasangan 1 m2 atap jurai rangka atap baja canai dingin profil C75

No Uraian Kode Satuan Koefisien Harga Jumlah


Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.760 80,000.00 60,832.00
Tukang besi L.02 OH 0.760 110,000.00 83,644.00
Kepala tukang L.03 OH 0.076 120,000.00 9,120.00
Mandor L.04 OH 0.038 120,000.00 4,560.00
JUMLAH TENAGA KERJA 158,156.00
B BAHAN
Baja ringan canai 16,100.00 65,205.00
kg 4.050
dingin C75
JUMLAH HARGA BAHAN 65,205.00
C PERALATAN
Peralatan % 0.100 -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 223,361.00


E Overhead & Profit 15.00% 33,504.15
F Harga Satuan Pekerjaan (D+E) 256,865.15

A.4.4.1 HARGA SATUAN PEKERJAAN PASANGAN DINDING

A. 4.4.1.1. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 2PP

No Uraian Kode Satuan Koefisien Harga Jumlah


Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.600 80,000.00 48,000.00
Tukang batu L.02 OH 0.200 110,000.00 22,000.00
Kepala tukang L.03 OH 0.020 120,000.00 2,400.00
Mandor L.04 OH 0.030 120,000.00 3,600.00
JUMLAH TENAGA KERJA 76,000.00
B BAHAN
Bata merah buah 140.000 900.00 126,000.00
Semen Portland Kg 43.500 1,633.00 71,035.50
Pasir pasang m3 0.080 222,812.50 17,825.00
JUMLAH HARGA BAHAN 214,860.50
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 290,860.50


E Overhead & Profit 15.00% 43,629.08
F Harga Satuan Pekerjaan (D+E) 334,489.58

A. 4.4.1.2. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 3PP

No Uraian Kode Satuan Koefisien Harga Jumlah


Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.600 80,000.00 48,000.00
Tukang batu L.02 OH 0.200 110,000.00 22,000.00
Kepala tukang L.03 OH 0.020 120,000.00 2,400.00
Mandor L.04 OH 0.030 120,000.00 3,600.00
JUMLAH TENAGA KERJA 76,000.00
B BAHAN
Bata merah buah 140.000 900.00 126,000.00
Semen Portland Kg 32.950 1,633.00 53,807.35
Pasir pasang m3 0.091 222,812.50 20,275.94
JUMLAH HARGA BAHAN 200,083.29
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 276,083.29


E Overhead & Profit 15.00% 41,412.49
F Harga Satuan Pekerjaan (D+E) 317,495.78

III - 95
A. 4.4.1.3. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 4PP
No Uraian Kode Satuan Koefisien Harga Jumlah
Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.600 80,000.00 48,000.00
Tukang batu L.02 OH 0.200 110,000.00 22,000.00
Kepala bukang L.03 OH 0.020 120,000.00 2,400.00
Mandor L.04 OH 0.030 120,000.00 3,600.00
JUMLAH TENAGA KERJA 76,000.00
B BAHAN
Bata merah buah 140.000 900.00 126,000.00
Semen Portland Kg 26.550 1,633.00 43,356.15
Pasir Pasang m3 0.093 222,812.50 20,721.56
JUMLAH HARGA BAHAN 190,077.71
C PERALATAN
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 266,077.71


E Overhead & Profit 15.00% 39,911.66
F Harga Satuan Pekerjaan (D+E) 305,989.37

A. 4.4.1.4. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 5PP
No Uraian Kode Satuan Koefisien Harga Jumlah
Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.600 80,000.00 48,000.00
Tukang batu L.02 OH 0.200 110,000.00 22,000.00
Kepala tukang L.03 OH 0.020 120,000.00 2,400.00
Mandor L.04 OH 0.030 120,000.00 3,600.00
JUMLAH TENAGA KERJA 76,000.00
B BAHAN
Bata merah buah 140.000 900.00 126,000.00
Semen Portland Kg 22.200 1,633.00 36,252.60
Pasir pasang m3 0.102 222,812.50 22,726.88
JUMLAH HARGA BAHAN 184,979.48
C PERALATAN
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 260,979.48


E Overhead & Profit 15.00% 39,146.92
F Harga Satuan Pekerjaan (D+E) 300,126.40

A. 4.4.1.5 Pemasangan 1m2 Dinding Bata Merah (5x11x22) cm tebal 1 batu campuran 1SP : 6PP
No Uraian Kode Satuan Koefisien Harga Jumlah
Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.600 80,000.00 48,000.00
Tukang batu L.02 OH 0.200 110,000.00 22,000.00
Kepala tukang L.03 OH 0.020 120,000.00 2,400.00
Mandor L.04 OH 0.030 120,000.00 3,600.00
JUMLAH TENAGA KERJA 76,000.00
B BAHAN
Bata merah buah 140.000 900.00 126,000.00
Semen Portland Kg 18.500 1,633.00 30,210.50
Pasir pasang m3 0.122 222,812.50 27,183.13
JUMLAH HARGA BAHAN 183,393.63
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 259,393.63


E Overhead & Profit 15.00% 38,909.04
F Harga Satuan Pekerjaan (D+E) 298,302.67

A. 4.4.1.6 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 3KP : 10PP
No Uraian Kode Satuan Koefisien Harga Jumlah
Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.600 80,000.00 48,000.00
Tukang batu L.02 OH 0.200 110,000.00 22,000.00
Kepala tukang L.03 OH 0.020 120,000.00 2,400.00
Mandor L.04 OH 0.030 120,000.00 3,600.00

III - 96
JUMLAH TENAGA KERJA 76,000.00

III - 97
B BAHAN
Bata merah buah 140.000 900.00 126,000.00
Semen Portland Kg 10.080 1,633.00 16,460.64
Kapur padam m3 0.028 253,000.00 6,957.50
Pasir pasang m3 0.093 222,812.50 20,610.16
JUMLAH HARGA BAHAN 170,028.30
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 246,028.30


E Overhead & Profit 15.00% 36,904.24
F Harga Satuan Pekerjaan (D+E) 282,932.54

A. 4.4.1.7 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 2PP
No Uraian Kode Satuan Koefisien Harga Jumlah
Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.300 80,000.00 24,000.00
Tukang batu L.02 OH 0.100 110,000.00 11,000.00
Kepala tukang L.03 OH 0.010 120,000.00 1,200.00
Mandor L.04 OH 0.015 120,000.00 1,800.00
JUMLAH TENAGA KERJA 38,000.00
B BAHAN
Bata merah buah 70.000 900.00 63,000.00
Semen Portland Kg 18.950 1,633.00 30,945.35
Pasir pasang m3 0.038 222,812.50 8,466.88
JUMLAH HARGA BAHAN 102,412.23
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 140,412.23


E Overhead & Profit 15.00% 21,061.83
F Harga Satuan Pekerjaan (D+E) 161,474.06

A. 4.4.1.8 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 3PP
No Uraian Kode Satuan Koefisien Harga Jumlah
Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.300 80,000.00 24,000.00
Tukang batu L.02 OH 0.100 110,000.00 11,000.00
Kepala tukang L.03 OH 0.010 120,000.00 1,200.00
Mandor L.04 OH 0.015 120,000.00 1,800.00
JUMLAH TENAGA KERJA 38,000.00
B BAHAN
Bata merah buah 70.000 900.00 63,000.00
Semen Portland Kg 14.370 1,633.00 23,466.21
Pasir pasang m3 0.040 222,812.50 8,912.50
JUMLAH HARGA BAHAN 95,378.71
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 133,378.71
E Overhead & Profit 15.00% 20,006.81
F Harga Satuan Pekerjaan (D+E) 153,385.52

A.4.4.1.9 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP :4PP

No Uraian Kode Satuan Koefisien Harga Jumlah


Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.300 80,000.00 24,000.00
Tukang batu L.02 OH 0.100 110,000.00 11,000.00
Kepala tukang L.03 OH 0.010 120,000.00 1,200.00
Mandor L.04 OH 0.015 120,000.00 1,800.00
JUMLAH TENAGA KERJA 38,000.00
B BAHAN
Bata merah buah 70.000 900.00 63,000.00
Semen Portland Kg 11.500 1,633.00 18,779.50
Pasir pasang m3 0.043 222,812.50 9,580.94
JUMLAH HARGA BAHAN 91,360.44
C PERALATAN

III - 98
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 129,360.44


E Overhead & Profit 15.00% 19,404.07
F Harga Satuan Pekerjaan (D+E) 148,764.50

III - 99
A. 4.4.1.10 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP :5PP
No Uraian Kode Satuan Koefisien Harga Jumlah
Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.300 80,000.00 24,000.00
Tukang batu L.02 OH 0.100 110,000.00 11,000.00
Kepala tukang L.03 OH 0.010 120,000.00 1,200.00
Mandor L.04 OH 0.015 120,000.00 1,800.00
JUMLAH TENAGA KERJA 38,000.00
B BAHAN
Bata merah buah 70.000 900.00 63,000.00
Semen Portland Kg 9.680 1,633.00 15,807.44
Pasir pasang m3 0.045 222,812.50 10,026.56
JUMLAH HARGA BAHAN 88,834.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 126,834.00


E Overhead & Profit 15.00% 19,025.10
F Harga Satuan Pekerjaan (D+E) 145,859.10

A. 4.4.1.11 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 6PP

No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA
Pekerja L.01 OH 0.300 80,000.00 24,000.00
Tukang batu L.02 OH 0.100 110,000.00 11,000.00
Kepala tukang L.03 OH 0.010 120,000.00 1,200.00
Mandor L.04 OH 0.015 120,000.00 1,800.00
JUMLAH TENAGA KERJA 38,000.00
B BAHAN
Bata merah buah 70.000 900.00 63,000.00
Semen Portland Kg 8.320 1,633.00 13,586.56
Pasir pasang m3 0.049 222,812.50 10,917.81
JUMLAH HARGA BAHAN 87,504.37
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 125,504.37


E Overhead & Profit 15.00% 18,825.66
F Harga Satuan Pekerjaan (D+E) 144,330.03

A. 4.4.1.12 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SP :8PP

No Uraian Kode Satuan Koefisien Harga Jumlah


Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.300 80,000.00 24,000.00
Tukang batu L.02 OH 0.100 110,000.00 11,000.00
Kepala tukang L.03 OH 0.010 120,000.00 1,200.00
Mandor L.04 OH 0.015 120,000.00 1,800.00
JUMLAH TENAGA KERJA 38,000.00
B BAHAN
Bata merah buah 70.000 900.00 63,000.00
Semen Portland Kg 6.500 1,633.00 10,614.50
Pasir pasang m3 0.050 222,812.50 11,140.63
JUMLAH HARGA BAHAN 84,755.13
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 122,755.13


E Overhead & Profit 15.00% 18,413.27
F Harga Satuan Pekerjaan (D+E) 141,168.39

III - 100
A. 4.4.1.13 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SP : 3KP :10PP

No Uraian Kode Satuan Koefisien Harga Jumlah


Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.300 80,000.00 24,000.00
Tukang batu L.02 OH 0.100 110,000.00 11,000.00
Kepala tukang L.03 OH 0.010 120,000.00 1,200.00
Mandor L.04 OH 0.015 120,000.00 1,800.00
JUMLAH TENAGA KERJA 38,000.00
B BAHAN
Bata merah buah 70.000 900.00 63,000.00
Semen Portland Kg 4.500 1,633.00 7,348.50
Kapur padam m3 0.015 253,000.00 3,795.00
Pasir pasang m3 0.050 222,812.50 11,140.63
JUMLAH HARGA BAHAN 85,284.13
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 123,284.13


E Overhead & Profit 15.00% 18,492.62
F Harga Satuan Pekerjaan (D+E) 141,776.74

A. 4.4.1.14 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SM : 1KP :1PP

No Uraian Kode Satuan Koefisien Harga Jumlah


Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.300 80,000.00 24,000.00
Tukang batu L.02 OH 0.100 110,000.00 11,000.00
Kepala tukang L.03 OH 0.010 120,000.00 1,200.00
Mandor L.04 OH 0.015 120,000.00 1,800.00
JUMLAH TENAGA KERJA 38,000.00
B BAHAN
Bata merah buah 70.000 900.00 63,000.00
Semen merah Kg 0.018 1,633.00 29.39
Kapur padam m3 0.018 253,000.00 4,554.00
Pasir pasang m3 0.018 222,812.50 4,010.63
JUMLAH HARGA BAHAN 71,594.02
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 109,594.02


E Overhead & Profit 15.00% 16,439.10
F Harga Satuan Pekerjaan (D+E) 126,033.12

A. 4.4.1.15 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SM : 1KP :2PP

No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA
Pekerja L.01 OH 0.300 80,000.00 24,000.00
Tukang batu L.02 OH 0.100 110,000.00 11,000.00
Kepala tukang L.03 OH 0.010 120,000.00 1,200.00
Mandor L.04 OH 0.015 120,000.00 1,800.00
JUMLAH TENAGA KERJA 38,000.00
B BAHAN
Bata merah buah 70.000 900.00 63,000.00
Semen merah Kg 0.014 1,633.00 22.86
Kapur padam m3 0.014 253,000.00 3,542.00
Pasir pasang m3 0.028 222,812.50 6,238.75
JUMLAH HARGA BAHAN 72,803.61
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 110,803.61


E Overhead & Profit 15.00% 16,620.54
F Harga Satuan Pekerjaan (D+E) 127,424.15

III - 101
A. 4.4.1.16 rob Pemasangan 1m2 dinding conblock HB20 campuran 1SP : 3PP

Uraian Kode Satuan Harga Jumlah


Koefisien Asli Koefisien Rubahan Satuan Harga
No (Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.350 80,000.00 28,000.00
Tukang batu L.02 OH 0.150 110,000.00 16,500.00
Kepala tukang L.03 OH 0.015 120,000.00 1,800.00
Mandor L.04 OH 0.018 120,000.00 2,160.00
JUMLAH TENAGA KERJA 48,460.00
B BAHAN
HB-20 bh 12.500 12.500 2,012.50 25,156.25
Semen Portland Kg 30.320 3.032 1,633.00 4,951.26
Pasir pasang m3 0.728 0.073 222,812.50 16,220.75
Besi angker diameter 8 Kg 0.280 0.028 14,950.00 418.60
JUMLAH HARGA BAHAN 46,746.86
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 95,206.86


E Overhead & Profit 15.00% 14,281.03
F Harga Satuan Pekerjaan (D+E) 109,487.88
HB20 : Hollow Block tebal 20cm

A. 4.4.1.17 rob Pemasangan 1m2 dinding conblock HB20 campuran 1SP : 4PP

No Uraian Kode Satuan Harga Jumlah


Koefisien Asli Koefisien Rubahan Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.350 80,000.00 28,000.00
Tukang batu L.02 OH 0.150 110,000.00 16,500.00
Kepala tukang L.03 OH 0.015 120,000.00 1,800.00
Mandor L.04 OH 0.018 120,000.00 2,160.00
JUMLAH TENAGA KERJA 48,460.00
B BAHAN
HB-20 buah 12.500 12.500 2,012.50 25,156.25
Semen Portland Kg 24.260 2.426 1,633.00 3,961.66
Pasir pasang m3 0.772 0.077 222,812.50 17,201.13
Besi angker diameter 8 Kg 0.280 0.280 14,950.00 4,186.00
JUMLAH HARGA BAHAN 50,505.03
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 98,965.03


E Overhead & Profit 15.00% 14,844.75
F Harga Satuan Pekerjaan (D+E) 113,809.79

A. 4.4.1.18 rob Pemasangan 1m2 dinding conblock HB15 campuran 1SP : 3PP

No Uraian Kode Satuan Harga Jumlah


Koefisien Asli Koefisien Rubahan Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.320 80,000.00 25,600.00
Tukang batu L.02 OH 0.120 110,000.00 13,200.00
Kepala tukang L.03 OH 0.012 120,000.00 1,440.00
Mandor L.04 OH 0.016 120,000.00 1,920.00
JUMLAH TENAGA KERJA 42,160.00
B BAHAN
HB-15 buah 12.500 12.500 1,725.00 21,562.50
Semen Portland Kg 22.740 2.274 1,633.00 3,713.44
Pasir pasang m3 0.550 0.055 222,812.50 12,254.69
Besi angker diameter 8 Kg 0.280 0.280 14,950.00 4,186.00
JUMLAH HARGA BAHAN 41,716.63
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 83,876.63


E Overhead & Profit 15.00% 12,581.49
F Harga Satuan Pekerjaan (D+E) 96,458.12

III - 102
HB15: Hollow Block tebal 15cm

III - 103
A. 4.4.1.19 rob Pemasangan 1 m2 dinding conblock HB15 campuran 1SP :4PP

No Uraian Kode Satuan Harga Jumlah


Koefisien Asli Koefisien Rubahan Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.320 80,000.00 25,600.00
Tukang batu L.02 OH 0.120 110,000.00 13,200.00
Kepala tukang L.03 OH 0.012 120,000.00 1,440.00
Mandor L.04 OH 0.016 120,000.00 1,920.00
JUMLAH TENAGA KERJA 42,160.00
B BAHAN
HB-15 buah 12.500 12.500 1,725.00 21,562.50
Semen Portland Kg 18.200 1.820 1,633.00 2,972.06
Pasir pasang m3 0.582 0.058 222,812.50 12,967.69
Besi angker diameter 8 Kg 0.280 0.280 14,950.00 4,186.00
JUMLAH HARGA BAHAN 41,688.25
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 83,848.25


E Overhead & Profit 15.00% 12,577.24
F Harga Satuan Pekerjaan (D+E) 96,425.48

A. 4.4.1.20 rob Pemasangan 1 m2 dinding conblock HB10 campuran 1SP :3PP

No Uraian Kode Satuan Harga Jumlah


Koefisien Asli Koefisien Rubahan Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.300 80,000.00 24,000.00
Tukang batu L.02 OH 0.100 110,000.00 11,000.00
Kepala tukang L.03 OH 0.010 120,000.00 1,200.00
Mandor L.04 OH 0.015 120,000.00 1,800.00
JUMLAH TENAGA KERJA 38,000.00
B BAHAN
HB-10 buah 12.500 12.500 1,552.50 19,406.25
Semen Portland Kg 15.160 1.516 1,633.00 2,475.63
Pasir pasang m3 0.364 0.036 222,812.50 8,110.38
Besi angker diameter 8 Kg 0.280 0.280 14,950.00 4,186.00
JUMLAH HARGA BAHAN 34,178.25
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 72,178.25


E Overhead & Profit 15.00% 10,826.74
F Harga Satuan Pekerjaan (D+E) 83,004.99
Hb10 : Hollow Block tebal 10 cm

A. 4.4.1.21.rob Pemasangan 1 m2 dinding conblock HB10 campuran 1SP : 4PP

No Uraian Kode Satuan Harga Jumlah


Koefisien Asli Koefisien Rubahan Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.300 80,000.00 24,000.00
Tukang batu L.02 OH 0.100 110,000.00 11,000.00
Kepala tukang L.03 OH 0.010 120,000.00 1,200.00
Mandor L.04 OH 0.015 120,000.00 1,800.00
JUMLAH TENAGA KERJA 38,000.00
B BAHAN
HB-10 buah 12.500 12.500 1,552.50 19,406.25
Semen Portland Kg 12.130 1.213 1,633.00 1,980.83
Pasir pasang m3 0.388 0.039 222,812.50 8,645.13
Besi angker diameter 8 Kg 0.280 0.280 14,950.00 4,186.00
JUMLAH HARGA BAHAN 34,218.20
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 72,218.20


E Overhead & Profit 15.00% 10,832.73
F Harga Satuan Pekerjaan (D+E) 83,050.93

III - 104
A. 4.4.1.22 Pemasangan 1 m2 dinding terawang (rooster) 12x11x24 campuran 1SP :3PP

No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA
Pekerja L.01 OH 0.300 80,000.00 24,000.00
Tukang batu L.02 OH 0.100 110,000.00 11,000.00
Kepala tukang L.03 OH 0.010 120,000.00 1,200.00
Mandor L.04 OH 0.015 120,000.00 1,800.00
JUMLAH TENAGA KERJA 38,000.00
B BAHAN
Bata rooster m3 30.000 2,800.00 84,000.00
Semen Portland Kg 11.000 1,633.00 17,963.00
Pasir pasang m3 0.035 222,812.50 7,798.44
JUMLAH HARGA BAHAN 109,761.44
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 147,761.44


E Overhead & Profit 15.00% 22,164.22
F Harga Satuan Pekerjaan (D+E) 169,925.65

A. 4.4.1.23 Pemasangan 1 cm2 dinding terawang (rooster) 12x11x24 campuran 1SP :4PP

No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA
Pekerja L.01 OH 0.300 80,000.00 24,000.00
Tukang batu L.02 OH 0.100 110,000.00 11,000.00
Kepala tukang L.03 OH 0.010 120,000.00 1,200.00
Mandor L.04 OH 0.015 120,000.00 1,800.00
JUMLAH TENAGA KERJA 38,000.00
B BAHAN
Bata berongga m3 30.000 2,800.00 84,000.00
Semen Portland Kg 11.000 1,633.00 17,963.00
Pasir pasang m3 0.035 222,812.50 7,798.44
JUMLAH HARGA BAHAN 109,761.44
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 147,761.44


E Overhead & Profit 15.00% 22,164.22
F Harga Satuan Pekerjaan (D+E) 169,925.65

A. 4.4.1.25 Pemasangan 1 m2 dinding bata ringan tebal 7,5 cm dengan mortar siap pakai

No Uraian Kode Satuan Koefisien Harga Jumlah


Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.670 80,000.00 53,600.00
Tukang batu L.02 OH 1.300 110,000.00 143,000.00
Kepala tukang L.03 OH 0.130 120,000.00 15,600.00
Mandor L.04 OH 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 212,560.00
B BAHAN
Bata ringan tebal 7,5cm buah 8.400 5,200.00 43,680.00
Mortar siap pakai Kg 0.473 4,312.50 2,039.81
JUMLAH HARGA BAHAN 45,719.81
C PERALATAN
Peralatan % 0.100 -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 258,279.81


E Overhead & Profit 15.00% 38,741.97
F Harga Satuan Pekerjaan (D+E) 297,021.78

III - 105
A. 4.4.1.26 Pemasangan 1m2 dinding bata ringan tebal 10 cm dengan mortar siap pakai

No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA
Pekerja L.01 OH 0.671 80,000.00 53,680.00
Tukang batu L.02 OH 1.300 110,000.00 143,000.00
Kepala tukang L.03 OH 0.130 120,000.00 15,600.00
Mandor L.04 OH 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 212,640.00
B BAHAN
Bata ringan tebal 10cm buah 8.400 6,000.00 50,400.00
Mortar siap pakai Kg 0.063 4,312.50 271.69
JUMLAH HARGA BAHAN 50,671.69
C PERALATAN
Peralatan % 0.100 -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 263,311.69


E Overhead & Profit 15.00% 39,496.75
F Harga Satuan Pekerjaan (D+E) 302,808.44

A.4.4.2 HARGA SATUAN PEKERJAAN PLESTERAN

A.4.4.2.1. Pemasangan 1 m2 plesteran 1SP : 1PP tebal 15 mm

Uraian Kode Satuan Koefisien Harga Jumlah


No Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.300 80,000.00 24,000.00
Tukang batu L.03 OH 0.150 110,000.00 16,500.00
Kepala tukang L.03 OH 0.015 120,000.00 1,800.00
Mandor L.04 OH 0.015 120,000.00 1,800.00
JUMLAH TENAGA KERJA 44,100.00
B BAHAN
PC Kg 15.504 1,633.00 25,318.03
PP m3 0.016 222,812.50 3,565.00
JUMLAH HARGA BAHAN 28,883.03
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 72,983.03


E Overhead & Profit 15.00% 10,947.45
F Harga Satuan Pekerjaan (D+E) 83,930.49

A.4.4.2.2. Pemasangan 1 m2 plesteran 1SP : 2PP tebal 15 mm

No Uraian Kode Satuan Koefisien Harga Jumlah


Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.300 80,000.00 24,000.00
Tukang batu L.03 OH 0.150 110,000.00 16,500.00
Kepala tukang L.03 OH 0.015 120,000.00 1,800.00
Mandor L.04 OH 0.015 120,000.00 1,800.00
JUMLAH TENAGA KERJA 44,100.00
B BAHAN
PC Kg 10.224 1,633.00 16,695.79
PP m3 0.020 222,812.50 4,456.25
JUMLAH HARGA BAHAN 21,152.04
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 65,252.04


E Overhead & Profit 15.00% 9,787.81
F Harga Satuan Pekerjaan (D+E) 75,039.85

III - 106
A.4.4.2.3. Pemasangan 1 m2 plesteran 1SP : 3PP tebal 15mm

Uraian Kode Satuan Koefisien Harga Jumlah


No Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.300 80,000.00 24,000.00
Tukang batu L.03 OH 0.150 110,000.00 16,500.00
Kepala tukang L.03 OH 0.015 120,000.00 1,800.00
Mandor L.04 OH 0.015 120,000.00 1,800.00
JUMLAH TENAGA KERJA 44,100.00
B BAHAN
PC Kg 7.776 1,633.00 12,698.21
PP m3 0.023 222,812.50 5,124.69
JUMLAH HARGA BAHAN 17,822.90
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 61,922.90


E Overhead & Profit 15.00% 9,288.43
F Harga Satuan Pekerjaan (D+E) 71,211.33

A.4.4.2.4. Pemasangan 1 m2 plesteran 1SP : 4PP tebal 15 mm

No Uraian Kode Satuan Koefisien Harga Jumlah


Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.300 80,000.00 24,000.00
Tukang batu L.03 OH 0.150 110,000.00 16,500.00
Kepala tukang L.03 OH 0.015 120,000.00 1,800.00
Mandor L.04 OH 0.015 120,000.00 1,800.00
JUMLAH TENAGA KERJA 44,100.00
B BAHAN
PC Kg 6.240 1,633.00 10,189.92
PP m3 0.024 222,812.50 5,347.50
JUMLAH HARGA BAHAN 15,537.42
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 59,637.42


E Overhead & Profit 15.00% 8,945.61
F Harga Satuan Pekerjaan (D+E) 68,583.03

A.4.4.2.5. Pemasangan 1 m2 plesteran 1SP : 5PP tebal 15 mm

No Uraian Kode Satuan Koefisien Harga Jumlah


Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.300 80,000.00 24,000.00
Tukang batu L.03 OH 0.150 110,000.00 16,500.00
Kepala tukang L.03 OH 0.015 120,000.00 1,800.00
Mandor L.04 OH 0.015 120,000.00 1,800.00
JUMLAH TENAGA KERJA 44,100.00
B BAHAN
PC Kg 5.184 1,633.00 8,465.47
PP m3 0.026 222,812.50 5,793.13
JUMLAH HARGA BAHAN 14,258.60
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 58,358.60


E Overhead & Profit 15.00% 8,753.79
F Harga Satuan Pekerjaan (D+E) 67,112.39

A.4.4.2.6. Pemasangan 1 m2 plesteran 1SP : 6PP tebal 15 mm

Uraian Kode Satuan Koefisien Harga Jumlah


No Satuan Harga
(Rp) (Rp)
A TENAGA

III - 107
Pekerja L.01 OH 0.300 80,000.00 24,000.00
Tukang batu L.03 OH 0.150 110,000.00 16,500.00
Kepala tukang L.03 OH 0.015 120,000.00 1,800.00
Mandor L.04 OH 0.015 120,000.00 1,800.00
JUMLAH TENAGA KERJA 44,100.00

III - 108
B BAHAN
PC Kg 4.416 1,633.00 7,211.33
PP m3 0.027 222,812.50 6,015.94
JUMLAH HARGA BAHAN 13,227.27
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 57,327.27


E Overhead & Profit 15.00% 8,599.09
F Harga Satuan Pekerjaan (D+E) 65,926.36

A.4.4.2.7. Pemasangan 1 m2 plesteran 1SP : 7PP tebal 15 mm

No Uraian Kode Satuan Koefisien Harga Jumlah


Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.300 80,000.00 24,000.00
Tukang batu L.03 OH 0.150 110,000.00 16,500.00
Kepala tukang L.03 OH 0.015 120,000.00 1,800.00
Mandor L.04 OH 0.015 120,000.00 1,800.00
JUMLAH TENAGA KERJA 44,100.00
B BAHAN
PC Kg 3.936 1,633.00 6,427.49
PP m3 0.028 222,812.50 6,238.75
JUMLAH HARGA BAHAN 12,666.24
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 56,766.24


E Overhead & Profit 15.00% 8,514.94
F Harga Satuan Pekerjaan (D+E) 65,281.17

A.4.4.2.8. Pemasangan 1 m2 plesteran 1SP : 8PP tebal 15 mm

No Uraian Kode Satuan Koefisien Harga Jumlah


Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.300 80,000.00 24,000.00
Tukang batu L.03 OH 0.150 110,000.00 16,500.00
Kepala tukang L.03 OH 0.015 120,000.00 1,800.00
Mandor L.04 OH 0.015 120,000.00 1,800.00
JUMLAH TENAGA KERJA 44,100.00
B BAHAN
PC Kg 3.456 1,633.00 5,643.65
PP m3 0.029 222,812.50 6,461.56
JUMLAH HARGA BAHAN 12,105.21
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 56,205.21


E Overhead & Profit 15.00% 8,430.78
F Harga Satuan Pekerjaan (D+E) 64,635.99

A.4.4.2.9. Pemasangan 1 m2 plesteran 1SP : 1/2KP : 3PP tebal 15 mm

No Uraian Kode Satuan Koefisien Harga Jumlah


Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.360 80,000.00 28,800.00
Tukang batu L.03 OH 0.120 110,000.00 13,200.00
Kepala tukang L.03 OH 0.012 120,000.00 1,440.00
Mandor L.04 OH 0.018 120,000.00 2,160.00
JUMLAH TENAGA KERJA 45,600.00
B BAHAN
PC Kg 5.760 1,633.00 9,406.08
KP m3 0.003 253,000.00 759.00
PP m3 0.013 222,812.50 2,896.56
JUMLAH HARGA BAHAN 13,061.64
C PERALATAN

III - 109
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 58,661.64


E Overhead & Profit 15.00% 8,799.25
F Harga Satuan Pekerjaan (D+E) 67,460.89

III - 110
A.4.4.2.10. Pemasangan 1 m2 plesteran 1SP : 2KP : 8PP tebal 15 mm

No Uraian Kode Satuan Koefisien Harga Jumlah


Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.360 80,000.00 28,800.00
Tukang batu L.03 OH 0.120 110,000.00 13,200.00
Kepala tukang L.03 OH 0.012 120,000.00 1,440.00
Mandor L.04 OH 0.018 120,000.00 2,160.00
JUMLAH TENAGA KERJA 45,600.00
B BAHAN
PC Kg 3.000 1,633.00 4,899.00
KP m3 0.005 253,000.00 1,265.00
PP m3 0.020 222,812.50 4,456.25
JUMLAH HARGA BAHAN 10,620.25
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 56,220.25


E Overhead & Profit 15.00% 8,433.04
F Harga Satuan Pekerjaan (D+E) 64,653.29

A.4.4.2.11. Pemasangan 1 m2 plesteran 1SM : 1KP : 1PP tebal 15 mm

No Uraian Kode Satuan Koefisien Harga Jumlah


Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.360 80,000.00 28,800.00
Tukang batu L.03 OH 0.120 110,000.00 13,200.00
Kepala tukang L.03 OH 0.012 120,000.00 1,440.00
Mandor L.04 OH 0.018 120,000.00 2,160.00
JUMLAH TENAGA KERJA 45,600.00
B BAHAN
SM m3 0.009 1,092.50 9.83
KP m3 0.009 253,000.00 2,277.00
PP m3 0.009 222,812.50 2,005.31
JUMLAH HARGA BAHAN 4,292.15
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 49,892.15


E Overhead & Profit 15.00% 7,483.82
F Harga Satuan Pekerjaan (D+E) 57,375.97

A.4.4.2.12. Pemasangan 1 m2 plesteran 1SM : 1KP : 2PP tebal 15 mm

No Uraian Kode Satuan Koefisien Harga Jumlah


Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.360 80,000.00 28,800.00
Tukang batu L.03 OH 0.120 110,000.00 13,200.00
Kepala tukang L.03 OH 0.012 120,000.00 1,440.00
Mandor L.04 OH 0.018 120,000.00 2,160.00
JUMLAH TENAGA KERJA 45,600.00
B BAHAN
SM m3 0.007 1,092.50 7.65
KP m3 0.007 253,000.00 1,771.00
PP m3 0.015 222,812.50 3,342.19
JUMLAH HARGA BAHAN 5,120.84
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 50,720.84


E Overhead & Profit 15.00% 7,608.13
F Harga Satuan Pekerjaan (D+E) 58,328.96

III - 111
A.4.4.2.13. Pemasangan 1 m2 plesteran 1SP : 1PP tebal 20 mm

No Uraian Kode Satuan Koefisien Harga Jumlah


Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.400 80,000.00 32,000.00
Tukang batu L.03 OH 0.200 110,000.00 22,000.00
Kepala tukang L.03 OH 0.020 120,000.00 2,400.00
Mandor L.04 OH 0.022 120,000.00 2,640.00
JUMLAH TENAGA KERJA 59,040.00
B BAHAN
PC Kg 13.632 1,633.00 22,261.06
PP m3 0.027 222,812.50 6,015.94
JUMLAH HARGA BAHAN 28,276.99
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 87,316.99


E Overhead & Profit 15.00% 13,097.55
F Harga Satuan Pekerjaan (D+E) 100,414.54

A.4.4.2.14. Pemasangan 1 m2 plesteran 1SP : 3PP tebal 20 mm

No Uraian Kode Satuan Koefisien Harga Jumlah


Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.260 80,000.00 20,800.00
Tukang batu L.03 OH 0.200 110,000.00 22,000.00
Kepala tukang L.03 OH 0.020 120,000.00 2,400.00
Mandor L.04 OH 0.013 120,000.00 1,560.00
JUMLAH TENAGA KERJA 46,760.00
B BAHAN
PC Kg 10.368 1,633.00 16,930.94
PP m3 0.031 222,812.50 6,907.19
JUMLAH HARGA BAHAN 23,838.13
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 70,598.13


E Overhead & Profit 15.00% 10,589.72
F Harga Satuan Pekerjaan (D+E) 81,187.85

A.4.4.2.15. Pemasangan 1 m2 plesteran 1SP : 4PP tebal 20 mm

No Uraian Kode Satuan Koefisien Harga Jumlah


Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.400 80,000.00 32,000.00
Tukang batu L.03 OH 0.200 110,000.00 22,000.00
Kepala tukang L.03 OH 0.020 120,000.00 2,400.00
Mandor L.04 OH 0.022 120,000.00 2,640.00
JUMLAH TENAGA KERJA 59,040.00
B BAHAN
PC Kg 8.320 1,633.00 13,586.56
PP m3 0.032 222,812.50 7,130.00
JUMLAH HARGA BAHAN 20,716.56
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 79,756.56


E Overhead & Profit 15.00% 11,963.48
F Harga Satuan Pekerjaan (D+E) 91,720.04

A.4.4.2.16. Pemasangan 1 m2 plesteran 1SP : 5PP tebal 20 mm

No Uraian Kode Satuan Koefisien Harga Jumlah


Satuan Harga
(Rp) (Rp)
A TENAGA

III - 112
Pekerja L.01 OH 0.400 80,000.00 32,000.00
Tukang batu L.03 OH 0.200 110,000.00 22,000.00
Kepala tukang L.03 OH 0.020 120,000.00 2,400.00
Mandor L.04 OH 0.022 120,000.00 2,640.00
JUMLAH TENAGA KERJA 59,040.00

III - 113
B BAHAN
PC Kg 6.912 1,633.00 11,287.30
PP m3 0.035 222,812.50 7,798.44
JUMLAH HARGA BAHAN 19,085.73
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 78,125.73


E Overhead & Profit 15.00% 11,718.86
F Harga Satuan Pekerjaan (D+E) 89,844.59

A.4.4.2.17. Pemasangan 1 m2 plesteran 1SP : 6PP tebal 20 mm

No Uraian Kode Satuan Koefisien Harga Jumlah


Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.400 80,000.00 32,000.00
Tukang Batu L.03 OH 0.200 110,000.00 22,000.00
Kepala Tukang L.03 OH 0.020 120,000.00 2,400.00
Mandor L.04 OH 0.022 120,000.00 2,640.00
JUMLAH TENAGA KERJA 59,040.00
B BAHAN
PC Kg 5.888 1,633.00 9,615.10
PP m3 0.036 222,812.50 8,021.25
JUMLAH HARGA BAHAN 17,636.35
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 76,676.35


E Overhead & Profit 15.00% 11,501.45
F Harga Satuan Pekerjaan (D+E) 88,177.81

A.4.4.2.18. Pemasangan 1 m2 plesteran 1SM : 1 KP : 2PP tebal 20 mm

No Uraian Kode Satuan Koefisien Harga Jumlah


Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.440 80,000.00 35,200.00
Tukang batu L.03 OH 0.220 110,000.00 24,200.00
Kepala tukang L.03 OH 0.022 120,000.00 2,640.00
Mandor L.04 OH 0.022 120,000.00 2,640.00
JUMLAH TENAGA KERJA 64,680.00
B BAHAN
SM m3 0.009 1,092.50 9.83
KP m3 0.009 253,000.00 2,277.00
PP m3 0.018 222,812.50 4,010.63
JUMLAH HARGA BAHAN 6,297.46
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 70,977.46


E Overhead & Profit 15.00% 10,646.62
F Harga Satuan Pekerjaan (D+E) 81,624.08

A.4.4.2.19. Pemasangan 1 m2 berapen 1SP : 5PP tebal 15 mm

No Uraian Kode Satuan Koefisien Harga Jumlah


Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.150 80,000.00 12,000.00
Tukang batu L.03 OH 0.075 110,000.00 8,250.00
Kepala tukang L.03 OH 0.008 120,000.00 960.00
Mandor L.04 OH 0.008 120,000.00 960.00
JUMLAH TENAGA KERJA 22,170.00
B BAHAN
PC Kg 5.184 1,633.00 8,465.47
PP m3 0.026 222,812.50 5,793.13
JUMLAH HARGA BAHAN 14,258.60
C PERALATAN

III - 114
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 36,428.60


E Overhead & Profit 15.00% 5,464.29
F Harga Satuan Pekerjaan (D+E) 41,892.89

III - 115
A.4.4.2.20. Pemasangan 1 m’ plesteran skoning 1SP : 3PP lebar 10 cm

No Uraian Kode Satuan Koefisien Harga Jumlah


Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.080 80,000.00 6,400.00
Tukang batu L.03 OH 0.400 110,000.00 44,000.00
Kepala tukang L.03 OH 0.040 120,000.00 4,800.00
Mandor L.04 OH 0.004 120,000.00 480.00
JUMLAH TENAGA KERJA 55,680.00
B BAHAN
Semen PC Kg 0.500 1,633.00 816.50
Pasir pasang m3 0.013 222,812.50 2,896.56
JUMLAH HARGA BAHAN 3,713.06
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 59,393.06


E Overhead & Profit 15.00% 8,908.96
F Harga Satuan Pekerjaan (D+E) 68,302.02

A.4.4.2.21. Pemasangan 1 m2 plesteran granit 1SP : 2 granit tebal 1cm

No Uraian Kode Satuan Koefisien Harga Jumlah


Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.450 80,000.00 36,000.00
Tukang batu L.03 OH 0.225 110,000.00 24,750.00
Kepala tukang L.03 OH 0.023 120,000.00 2,760.00
Mandor L.04 OH 0.023 120,000.00 2,760.00
JUMLAH TENAGA KERJA 66,270.00
B BAHAN
Semen PC Kg 10.000 1,633.00 16,330.00
Batu granit Kg 15.000 5,750.00 86,250.00
JUMLAH HARGA BAHAN 102,580.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 168,850.00


E Overhead & Profit 15.00% 25,327.50
F Harga Satuan Pekerjaan (D+E) 194,177.50

A.4.4.2.22 Pemasangan 1 m2 plesteran traso 1SP : 2 traso tebal 1 cm

No Uraian Kode Satuan Koefisien Harga Jumlah


Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.450 80,000.00 36,000.00
Tukang batu L.03 OH 0.225 110,000.00 24,750.00
Kepala tukang L.03 OH 0.023 120,000.00 2,760.00
Mandor L.04 OH 0.023 120,000.00 2,760.00
JUMLAH TENAGA KERJA 66,270.00
B BAHAN
Semen PC Kg 10.000 1,633.00 16,330.00
Batu traso Kg 15.000 5,750.00 86,250.00
JUMLAH HARGA BAHAN 102,580.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 168,850.00


E Overhead & Profit 15.00% 25,327.50
F Harga Satuan Pekerjaan (D+E) 194,177.50

A.4.4.2.23. Pemasangan 1 m2 plesteran ciprat 1SP : 2PP

No Uraian Kode Satuan Koefisien Harga Jumlah


Satuan Harga
(Rp) (Rp)

III - 116
A TENAGA
Pekerja L.01 OH 0.300 80,000.00 24,000.00
Tukang batu L.03 OH 0.100 110,000.00 11,000.00
Kepala tukang L.03 OH 0.010 120,000.00 1,200.00
Mandor L.04 OH 0.015 120,000.00 1,800.00
JUMLAH TENAGA KERJA 38,000.00

III - 117
B BAHAN
Semen PC Kg 4.320 1,633.00 7,054.56
Pasir pasang m3 0.006 222,812.50 1,336.88
JUMLAH HARGA BAHAN 8,391.44
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 46,391.44


E Overhead & Profit 15.00% 6,958.72
F Harga Satuan Pekerjaan (D+E) 53,350.15

A.4.4.2.24 Pemasangan 1 m2 finishing siar pasangan bata merah

No Uraian Kode Satuan Koefisien Harga Jumlah


Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.150 80,000.00 12,000.00
Tukang batu L.03 OH 0.075 110,000.00 8,250.00
Kepala tukang L.03 OH 0.008 120,000.00 960.00
Mandor L.04 OH 0.008 120,000.00 960.00
JUMLAH TENAGA KERJA 22,170.00
B BAHAN
Semen PC Kg 3.108 1,633.00 5,075.36
JUMLAH HARGA BAHAN 5,075.36
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 27,245.36


E Overhead & Profit 15.00% 4,086.80
F Harga Satuan Pekerjaan (D+E) 31,332.17

A.4.4.2.25. Pemasangan 1 m2 finishing siar pasangan conblock ekspose

No Uraian Kode Satuan Koefisien Harga Jumlah


Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.070 80,000.00 5,600.00
Tukang batu L.03 OH 0.035 110,000.00 3,850.00
Kepala tukang L.03 OH 0.004 120,000.00 480.00
Mandor L.04 OH 0.004 120,000.00 480.00
JUMLAH TENAGA KERJA 10,410.00
B BAHAN
Semen PC Kg 1.600 1,633.00 2,612.80
JUMLAH HARGA BAHAN 2,612.80
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 13,022.80


E Overhead & Profit 15.00% 1,953.42
F Harga Satuan Pekerjaan (D+E) 14,976.22

A.4.4.2.26. Pemasangan 1 m2 finishing siar pasangan batu kali, campuran 1SP : 2PP

No Uraian Kode Satuan Koefisien Harga Jumlah


Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.300 80,000.00 24,000.00
Tukang batu L.03 OH 0.150 110,000.00 16,500.00
Kepala tukang L.03 OH 0.015 120,000.00 1,800.00
Mandor L.04 OH 0.015 120,000.00 1,800.00
JUMLAH TENAGA KERJA 44,100.00
B BAHAN
Semen PC Kg 6.340 1,633.00 10,353.22
Pasir pasang m3 0.012 222,812.50 2,673.75
JUMLAH HARGA BAHAN 13,026.97
C PERALATAN

JUMLAH HARGA ALAT -

III - 118
D Jumlah (A+B+C) 57,126.97
E Overhead & Profit 15.00% 8,569.05
F Harga Satuan Pekerjaan (D+E) 65,696.02

III - 119
A.4.4.2.27. Pemasangan 1 m2 acian

No Uraian Kode Satuan Koefisien Harga Jumlah


Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.200 80,000.00 16,000.00
Tukang batu L.03 OH 0.100 110,000.00 11,000.00
Kepala tukang L.03 OH 0.010 120,000.00 1,200.00
Mandor L.04 OH 0.010 120,000.00 1,200.00
JUMLAH TENAGA KERJA 29,400.00
B BAHAN
Semen PC Kg 3.250 1,633.00 5,307.25
JUMLAH HARGA BAHAN 5,307.25
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 34,707.25


E Overhead & Profit 15.00% 5,206.09
F Harga Satuan Pekerjaan (D+E) 39,913.34

A.4.4.3 HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING

A.4.4.3.2. Pemasangan 1 m2 lantai ubin PC abu-abu ukuran 30 cm x30 cm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.250 80,000.00 20,000.00
Tukang batu L.02 OH 0.125 110,000.00 13,750.00
Kepala tukang L.03 OH 0.013 120,000.00 1,560.00
Mandor L.04 OH 0.013 120,000.00 1,560.00
JUMLAH TENAGA KERJA 36,870.00
B BAHAN
Ubin abu-abu Bh 11.870 2,875.00 34,126.25
Semen Portland kg 10.000 1,633.00 16,330.00
Pasir pasang M3 0.045 222,812.50 10,026.56
JUMLAH HARGA BAHAN 60,482.81
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 97,352.81


E Overhead & Profit 15.00% 14,602.92
F Harga Satuan Pekerjaan (D+E) 111,955.73

A.4.4.3.3. Pemasangan 1 m2 lantai ubin PC abu-abu ukuran 20 cm x 20 cm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.270 80,000.00 21,600.00
Tukang batu L.02 OH 0.135 110,000.00 14,850.00
Kepala tukang L.03 OH 0.014 120,000.00 1,680.00
Mandor L.04 OH 0.014 120,000.00 1,680.00
JUMLAH TENAGA KERJA 39,810.00
B BAHAN
Ubin abu-abu buah 26.500 2,300.00 60,950.00
Semen Portland kg 10.400 1,633.00 16,983.20
Pasir pasang M3 0.045 222,812.50 10,026.56
JUMLAH HARGA BAHAN 87,959.76
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 127,769.76


E Overhead & Profit 15.00% 19,165.46
F Harga Satuan Pekerjaan (D+E) 146,935.23

III - 120
III - 121
A.4.4.3.5. Pemasangan 1 m2 lantai ubin warna ukuran 30 cm x 30 cm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.260 80,000.00 20,800.00
Tukang batu L.02 OH 0.130 110,000.00 14,300.00
Kepala tukang L.03 OH 0.013 120,000.00 1,560.00
Mandor L.04 OH 0.013 120,000.00 1,560.00
JUMLAH TENAGA KERJA 38,220.00
B BAHAN
Ubin warna Bh 11.870 3,335.00 39,586.45
Semen Portland kg 10.000 1,633.00 16,330.00
Semen warna Kg 0.600 6,900.00 4,140.00
Pasir pasang M3 0.045 222,812.50 10,026.56
JUMLAH HARGA BAHAN 70,083.01
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 108,303.01


E Overhead & Profit 15.00% 16,245.45
F Harga Satuan Pekerjaan (D+E) 124,548.46

A.4.4.3.6. Pemasangan 1 m2 lantai ubin warna ukuran 20 cm x 20 cm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.270 80,000.00 21,600.00
Tukang batu L.02 OH 0.135 110,000.00 14,850.00
Kepala tukang L.03 OH 0.014 120,000.00 1,680.00
Mandor L.04 OH 0.014 120,000.00 1,680.00
JUMLAH TENAGA KERJA 39,810.00
B BAHAN
Ubin warna Bh 26.500 2,645.00 70,092.50
Semen Portland kg 10.400 1,633.00 16,983.20
Semen warna Kg 1.000 6,900.00 6,900.00
Pasir pasang M3 0.045 222,812.50 10,026.56
JUMLAH HARGA BAHAN 104,002.26
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 143,812.26


E Overhead & Profit 15.00% 21,571.84
F Harga Satuan Pekerjaan (D+E) 165,384.10

A.4.4.3.9. Pemasangan 1 m2 lantai ubin granit ukuran 40 cm x 40 cm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.250 80,000.00 20,000.00
Tukang batu L.02 OH 0.125 110,000.00 13,750.00
Kepala tukang L.03 OH 0.013 120,000.00 1,560.00
Mandor L.04 OH 0.013 120,000.00 1,560.00
JUMLAH TENAGA KERJA 36,870.00
B BAHAN
Ubin granit Bh 6.630 64,630.00 428,496.90
Semen Portland kg 9.800 1,633.00 16,003.40
Semen warna Kg 1.300 6,900.00 8,970.00
Pasir pasang M3 0.045 222,812.50 10,026.56
JUMLAH HARGA BAHAN 463,496.86
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 500,366.86


E Overhead & Profit 15.00% 75,055.03
F Harga Satuan Pekerjaan (D+E) 575,421.89

III - 122
III - 123
A.4.4.3.32. Pemasangan 1m2 lantai keramik artistik 10 cm x 20 cm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.700 80,000.00 56,000.00
Tukang batu L.02 OH 0.350 110,000.00 38,500.00
Kepala tukang L.03 OH 0.035 120,000.00 4,200.00
Mandor L.04 OH 0.035 120,000.00 4,200.00
JUMLAH TENAGA KERJA 102,900.00
B BAHAN
Ubin keramik Bh 53.000 1,150.00 60,950.00
Semen Portland Kg 8.190 1,633.00 13,374.27
Pasir pasang M3 0.045 222,812.50 10,026.56
Semen warna Kg 2.750 6,900.00 18,975.00
JUMLAH HARGA BAHAN 103,325.83
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 206,225.83


E Overhead & Profit 15.00% 30,933.87
F Harga Satuan Pekerjaan (D+E) 237,159.71

A.4.4.3.35. Pemasangan 1m2 lantai keramik ukuran 30 cm x 30 cm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.700 80,000.00 56,000.00
Tukang batu L.02 OH 0.350 110,000.00 38,500.00
Kepala tukang L.03 OH 0.035 120,000.00 4,200.00
Mandor L.04 OH 0.035 120,000.00 4,200.00
JUMLAH TENAGA KERJA 102,900.00
B BAHAN
Ubin keramik Doos 1.050 53,130.00 55,786.50
Semen Portland Kg 10.000 1,633.00 16,330.00
Pasir pasang M3 0.045 222,812.50 10,026.56
Semen warna Kg 0.500 6,900.00 3,450.00
JUMLAH HARGA BAHAN 85,593.06
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 188,493.06


E Overhead & Profit 15.00% 28,273.96
F Harga Satuan Pekerjaan (D+E) 216,767.02

A.4.4.3.36. Pemasangan 1m2 lantai keramik ukuran 20 cm x 20 cm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.700 80,000.00 56,000.00
Tukang batu L.02 OH 0.350 110,000.00 38,500.00
Kepala tukang L.03 OH 0.035 120,000.00 4,200.00
Mandor L.04 OH 0.035 120,000.00 4,200.00
JUMLAH TENAGA KERJA 102,900.00
B BAHAN
Ubin keramik Doos 1.050 186,875.00 196,218.75
Semen Portland Kg 10.400 1,633.00 16,983.20
Pasir pasang M3 0.045 222,812.50 10,026.56
Semen warna Kg 0.500 6,900.00 3,450.00
JUMLAH HARGA BAHAN 226,678.51
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 329,578.51


E Overhead & Profit 15.00% 49,436.78
F Harga Satuan Pekerjaan (D+E) 379,015.29

III - 124
III - 125
A.4.4.3.38. Pemasangan 1m2 lantai keramik mozaik ukuran 30 cm x 30 cm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.700 80,000.00 56,000.00
Tukang batu L.02 OH 0.350 110,000.00 38,500.00
Kepala tukang L.03 OH 0.035 120,000.00 4,200.00
Mandor L.04 OH 0.035 120,000.00 4,200.00
JUMLAH TENAGA KERJA 102,900.00
B BAHAN
Ubin keramik Bh 11.870 4,600.00 54,602.00
Semen Portland Kg 14.150 1,633.00 23,106.95
Pasir pasang M3 0.039 222,812.50 8,689.69
Semen warna Kg 2.000 6,900.00 13,800.00
JUMLAH HARGA BAHAN 100,198.64
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 203,098.64


E Overhead & Profit 15.00% 30,464.80
F Harga Satuan Pekerjaan (D+E) 233,563.43

A.4.4.3.39. Pemasangan 1 m’ plint keramik ukuran 10 cm x 20 cm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.090 80,000.00 7,200.00
Tukang batu L.02 OH 0.090 110,000.00 9,900.00
Kepala tukang L.03 OH 0.035 120,000.00 4,200.00
Mandor L.04 OH 0.005 120,000.00 600.00
JUMLAH TENAGA KERJA 21,900.00
B BAHAN
Plint keramik Bh 5.300 13,800.00 73,140.00
Semen Portland Kg 1.140 1,633.00 1,861.62
Pasir pasang M3 0.003 222,812.50 668.44
Semen warna Kg 0.025 6,900.00 172.50
JUMLAH HARGA BAHAN 75,842.56
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 97,742.56


E Overhead & Profit 15.00% 14,661.38
F Harga Satuan Pekerjaan (D+E) 112,403.94

A.4.4.3.40. Pemasangan 1 m’ plint keramik ukuran 10 cm x 10 cm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.090 80,000.00 7,200.00
Tukang batu L.02 OH 0.090 110,000.00 9,900.00
Kepala tukang L.03 OH 0.035 120,000.00 4,200.00
Mandor L.04 OH 0.005 120,000.00 600.00
JUMLAH TENAGA KERJA 21,900.00
B BAHAN
Plint keramik Bh 10.600 10,350.00 109,710.00
Semen Portland Kg 1.140 1,633.00 1,861.62
Pasir pasang M3 0.003 222,812.50 668.44
Semen warna Kg 0.050 6,900.00 345.00
JUMLAH HARGA BAHAN 112,585.06
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 134,485.06


E Overhead & Profit 15.00% 20,172.76
F Harga Satuan Pekerjaan (D+E) 154,657.82

III - 126
A.4.4.3.41. Pemasangan 1 m’ plint keramik ukuran 5 cm x 20 cm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.090 80,000.00 7,200.00
Tukang batu L.02 OH 0.090 110,000.00 9,900.00
Kepala tukang L.03 OH 0.035 120,000.00 4,200.00
Mandor L.04 OH 0.005 120,000.00 600.00
JUMLAH TENAGA KERJA 21,900.00
B BAHAN
Plint keramik Bh 5.300 10,350.00 54,855.00
Semen Portland Kg 0.570 1,633.00 930.81
Pasir pasang M3 0.002 222,812.50 334.22
Semen warna Kg 0.013 6,900.00 89.70
JUMLAH HARGA BAHAN 56,209.73
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 78,109.73


E Overhead & Profit 15.00% 11,716.46
F Harga Satuan Pekerjaan (D+E) 89,826.19

A.4.4.3.42. Pemasangan 1 m’ plint internal cove artistik 5 cm x 5 cm x 20 cm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.750 80,000.00 60,000.00
Tukang batu L.02 OH 0.750 110,000.00 82,500.00
Kepala tukang L.03 OH 0.075 120,000.00 9,000.00
Mandor L.04 OH 0.038 120,000.00 4,560.00
JUMLAH TENAGA KERJA 156,060.00
B BAHAN
Internal cove Bh 5.300 17,250.00 91,425.00
Semen Portland Kg 1.140 1,633.00 1,861.62
Pasir pasang M3 0.003 222,812.50 668.44
Semen warna Kg 0.100 6,900.00 690.00
JUMLAH HARGA BAHAN 94,645.06
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 250,705.06


E Overhead & Profit 15.00% 37,605.76
F Harga Satuan Pekerjaan (D+E) 288,310.82

A.4.4.3.43. Pemasangan 1 m2 lantai marmer ukuran 100cm x 100cm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.700 80,000.00 56,000.00
Tukang batu L.02 OH 0.350 110,000.00 38,500.00
Kepala tukang L.03 OH 0.035 120,000.00 4,200.00
Mandor L.04 OH 0.035 120,000.00 4,200.00
JUMLAH TENAGA KERJA 102,900.00
B BAHAN
Marmer Bh 1.060 920,000.00 975,200.00
Semen Portland Kg 8.190 1,633.00 13,374.27
Pasir pasang M3 0.045 222,812.50 10,026.56
Semen warna Kg 0.134 6,900.00 924.60
JUMLAH HARGA BAHAN 999,525.43
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 1,102,425.43


E Overhead & Profit 15.00% 165,363.81
F Harga Satuan Pekerjaan (D+E) 1,267,789.25

III - 127
A.4.4.3.44. Pemasangan 1 m2 lantai karpet

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.170 80,000.00 13,600.00
Tukang kayu L.02 OH 0.170 110,000.00 18,700.00
Kepala tukang L.03 OH 0.017 120,000.00 2,040.00
Mandor L.04 OH 0.009 120,000.00 1,080.00
JUMLAH TENAGA KERJA 35,420.00
B BAHAN
Karpet m2 1.050 115,000.00 120,750.00
Lem Kg 0.350 78,775.00 27,571.25
JUMLAH HARGA BAHAN 148,321.25
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 183,741.25


E Overhead & Profit 15.00% 27,561.19
F Harga Satuan Pekerjaan (D+E) 211,302.44

A.4.4.3.45. Pemasangan 1 m2 underlayer (pelapis bawah karpet)

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.120 80,000.00 9,600.00
Tukang kayu L.02 OH 0.120 110,000.00 13,200.00
Kepala tukang L.03 OH 0.012 120,000.00 1,440.00
Mandor L.04 OH 0.006 120,000.00 720.00
JUMLAH TENAGA KERJA 24,960.00
B BAHAN
Underlayer m2 1.050 57,500.00 60,375.00
Lem Kg 0.350 78,775.00 27,571.25
JUMLAH HARGA BAHAN 87,946.25
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 112,906.25


E Overhead & Profit 15.00% 16,935.94
F Harga Satuan Pekerjaan (D+E) 129,842.19

A.4.4.3.46. Pemasangan 1 m2 lantai parquet kayu

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.700 80,000.00 56,000.00
Tukang kayu L.02 OH 0.350 110,000.00 38,500.00
Kepala tukang L.03 OH 0.035 120,000.00 4,200.00
Mandor L.04 OH 0.035 120,000.00 4,200.00
JUMLAH TENAGA KERJA 102,900.00
B BAHAN
Parquet m2 1.050 172,500.00 181,125.00
Lem Kg 0.600 78,775.00 47,265.00
JUMLAH HARGA BAHAN 228,390.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 331,290.00


E Overhead & Profit 15.00% 49,693.50
F Harga Satuan Pekerjaan (D+E) 380,983.50

A.4.4.3.47. Pemasangan 1 m2 lantai kayu gymfloor

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.700 80,000.00 56,000.00

III - 128
Tukang kayu L.02 OH 0.350 110,000.00 38,500.00
Kepala tukang L.03 OH 0.035 120,000.00 4,200.00
Mandor L.04 OH 0.035 120,000.00 4,200.00
JUMLAH TENAGA KERJA 102,900.00

III - 129
B BAHAN
Parquet m2 1.050 172,500.00 181,125.00
Lem Kg 0.600 78,775.00 47,265.00
JUMLAH HARGA BAHAN 228,390.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 331,290.00


E Overhead & Profit 15.00% 49,693.50
F Harga Satuan Pekerjaan (D+E) 380,983.50

A.4.4.3.49. Pemasangan 1 m2 dinding porselen 10 cm x 20 cm


Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.900 80,000.00 72,000.00
Tukang batu L.02 OH 0.450 110,000.00 49,500.00
Kepala tukang L.03 OH 0.045 120,000.00 5,400.00
Mandor L.04 OH 0.045 120,000.00 5,400.00
JUMLAH TENAGA KERJA 132,300.00
B BAHAN
Porslen buah 53.000 1,150.00 60,950.00
Semen Portland Kg 9.300 1,633.00 15,186.90
Pasir pasang M3 0.018 222,812.50 4,010.63
Semen warna Kg 2.750 6,900.00 18,975.00
JUMLAH HARGA BAHAN 99,122.53
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 231,422.53


E Overhead & Profit 15.00% 34,713.38
F Harga Satuan Pekerjaan (D+E) 266,135.90

A.4.4.3.50. Pemasangan 1 m2 dinding porselen 20 cm x 20 cm


Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.900 80,000.00 72,000.00
Tukang batu L.02 OH 0.450 110,000.00 49,500.00
Kepala tukang L.03 OH 0.045 120,000.00 5,400.00
Mandor L.04 OH 0.045 120,000.00 5,400.00
JUMLAH TENAGA KERJA 132,300.00
B BAHAN
Porslen buah 26.000 2,300.00 59,800.00
Semen Portland Kg 9.300 1,633.00 15,186.90
Pasir pasang M3 0.018 222,812.50 4,010.63
Semen warna Kg 1.940 6,900.00 13,386.00
JUMLAH HARGA BAHAN 92,383.53
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 224,683.53


E Overhead & Profit 15.00% 33,702.53
F Harga Satuan Pekerjaan (D+E) 258,386.05

A.4.4.3.51. Pemasangan 1 m2 dinding keramik artistik 10 cm x 20 cm


Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.900 80,000.00 72,000.00
Tukang batu L.02 OH 0.450 110,000.00 49,500.00
Kepala tukang L.03 OH 0.045 120,000.00 5,400.00
Mandor L.04 OH 0.045 120,000.00 5,400.00
JUMLAH TENAGA KERJA 132,300.00
B BAHAN
Keramik artistik buah 53.000 3,910.00 207,230.00
Semen Portland Kg 9.300 1,633.00 15,186.90
Pasir pasang M3 0.018 222,812.50 4,010.63
Semen warna Kg 2.750 6,900.00 18,975.00
JUMLAH HARGA BAHAN 245,402.53

III - 130
C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 377,702.53
E Overhead & Profit 15.00% 56,655.38
F Harga Satuan Pekerjaan (D+E) 434,357.90

III - 131
A.4.4.3.52. Pemasangan 1 m2 dinding keramik artistik 5 cm x 20 cm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.900 80,000.00 72,000.00
Tukang batu L.02 OH 0.450 110,000.00 49,500.00
Kepala tukang L.03 OH 0.045 120,000.00 5,400.00
Mandor L.04 OH 0.045 120,000.00 5,400.00
JUMLAH TENAGA KERJA 132,300.00
B BAHAN
Keramik artistik buah 106.000 1,955.00 207,230.00
Semen Portland Kg 9.300 1,633.00 15,186.90
Pasir pasang M3 0.018 222,812.50 4,010.63
Semen warna Kg 2.900 6,900.00 20,010.00
JUMLAH HARGA BAHAN 246,437.53
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 378,737.53


E Overhead & Profit 15.00% 56,810.63
F Harga Satuan Pekerjaan (D+E) 435,548.15

A.4.4.3.53. Pemasangan 1 m2 dinding keramik 10 cm x 20 cm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.900 80,000.00 72,000.00
Tukang batu L.02 OH 0.450 110,000.00 49,500.00
Kepala tukang L.03 OH 0.045 120,000.00 5,400.00
Mandor L.04 OH 0.045 120,000.00 5,400.00
JUMLAH TENAGA KERJA 132,300.00
B BAHAN
Keramik artistik buah 53.000 1,150.00 60,950.00
Semen Portland Kg 9.300 1,633.00 15,186.90
Pasir pasang M3 0.018 222,812.50 4,010.63
Semen warna Kg 2.750 6,900.00 18,975.00
JUMLAH HARGA BAHAN 99,122.53
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 231,422.53


E Overhead & Profit 15.00% 34,713.38
F Harga Satuan Pekerjaan (D+E) 266,135.90

A.4.4.3.54. Pemasangan 1 m2 dinding keramik 20 cm x 20 cm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.900 80,000.00 72,000.00
Tukang batu L.02 OH 0.450 110,000.00 49,500.00
Kepala tukang L.03 OH 0.045 120,000.00 5,400.00
Mandor L.04 OH 0.045 120,000.00 5,400.00
JUMLAH TENAGA KERJA 132,300.00
B BAHAN
Keramik artistik buah 26.500 2,300.00 60,950.00
Semen Portland Kg 9.300 1,633.00 15,186.90
Pasir pasang M3 0.018 222,812.50 4,010.63
Semen warna Kg 1.940 6,900.00 13,386.00
JUMLAH HARGA BAHAN 93,533.53
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 225,833.53


E Overhead & Profit 15.00% 33,875.03
F Harga Satuan Pekerjaan (D+E) 259,708.55

III - 132
A.4.4.3.55. Pemasangan 1 m2 dinding marmer 100 cm x 100 cm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.300 80,000.00 104,000.00
Tukang batu L.02 OH 0.650 110,000.00 71,500.00
Kepala tukang L.03 OH 0.065 120,000.00 7,800.00
Mandor L.04 OH 0.065 120,000.00 7,800.00
JUMLAH TENAGA KERJA 191,100.00
B BAHAN
Marmer buah 1.060 920,000.00 975,200.00
Semen Portland Kg 12.440 1,633.00 20,314.52
Pasir pasang M3 0.025 222,812.50 5,570.31
Semen warna Kg 0.650 6,900.00 4,485.00
Paku 12 cm buah 3.030 460.00 1,393.80
JUMLAH HARGA BAHAN 1,006,963.63
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 1,198,063.63


E Overhead & Profit 15.00% 179,709.54
F Harga Satuan Pekerjaan (D+E) 1,377,773.18

A.4.4.3.56. Pemasangan 1 m2 dinding bata pelapis 3 cm x 7 cm x 24 cm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.000 80,000.00 80,000.00
Tukang batu L.02 OH 0.500 110,000.00 55,000.00
Kepala tukang L.03 OH 0.050 120,000.00 6,000.00
Mandor L.04 OH 0.050 120,000.00 6,000.00
JUMLAH TENAGA KERJA 147,000.00
B BAHAN
Bata pelapis buah 63.000 4,715.00 297,045.00
Semen Portland Kg 12.440 1,633.00 20,314.52
Pasir pasang M3 0.025 222,812.50 5,570.31
Semen warna Kg 2.750 6,900.00 18,975.00
JUMLAH HARGA BAHAN 341,904.83
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 488,904.83


E Overhead & Profit 15.00% 73,335.72
F Harga Satuan Pekerjaan (D+E) 562,240.56

A.4.4.3.57. Pemasangan 1 m2 dinding batu paras

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.700 80,000.00 56,000.00
Tukang batu L.02 OH 0.350 110,000.00 38,500.00
Kepala tukang L.03 OH 0.035 120,000.00 4,200.00
Mandor L.04 OH 0.035 120,000.00 4,200.00
JUMLAH TENAGA KERJA 102,900.00
B BAHAN
Batu paras buah 1.100 4,830.00 5,313.00
Semen Portland Kg 11.750 1,633.00 19,187.75
Pasir pasang M3 0.035 222,812.50 7,798.44
JUMLAH HARGA BAHAN 32,299.19
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 135,199.19


E Overhead & Profit 15.00% 20,279.88
F Harga Satuan Pekerjaan (D+E) 155,479.07

III - 133
A.4.4.3.58. Pemasangan 1 m2 dinding batu tempel hitam

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.700 80,000.00 56,000.00
Tukang batu L.02 OH 0.350 110,000.00 38,500.00
Kepala tukang L.03 OH 0.035 120,000.00 4,200.00
Mandor L.04 OH 0.035 120,000.00 4,200.00
JUMLAH TENAGA KERJA 102,900.00
B BAHAN
Batu tempel hitam Buah 1.100 1,782.50 1,960.75
Semen Portland Kg 11.750 1,633.00 19,187.75
Pasir pasang M3 0.035 222,812.50 7,798.44
JUMLAH HARGA BAHAN 28,946.94
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 131,846.94


E Overhead & Profit 15.00% 19,777.04
F Harga Satuan Pekerjaan (D+E) 151,623.98

A.4.4.3.59. Pemasangan 1 m2 lantai vynil ukuran 30 cm x 30 cm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.150 80,000.00 12,000.00
Tukang batu L.02 OH 0.150 110,000.00 16,500.00
Kepala tukang L.03 OH 0.015 120,000.00 1,800.00
Mandor L.04 OH 0.008 120,000.00 960.00
JUMLAH TENAGA KERJA 31,260.00
B BAHAN
Vynil buah 11.870 12,650.00 150,155.50
Lem Kg 0.350 25,300.00 8,855.00
JUMLAH HARGA BAHAN 159,010.50
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 190,270.50


E Overhead & Profit 15.00% 28,540.58
F Harga Satuan Pekerjaan (D+E) 218,811.08

A.4.4.3.60. Pemasangan 1 m2 wallpaper lebar 50 cm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.350 80,000.00 28,000.00
Tukang batu L.02 OH 0.175 110,000.00 19,250.00
Kepala tukang L.03 OH 0.017 120,000.00 2,040.00
Mandor L.04 OH 0.002 120,000.00 240.00
JUMLAH TENAGA KERJA 49,530.00
B BAHAN
Wallpaper m 2.200 80,500.00 177,100.00
Lem Kg 0.250 25,300.00 6,325.00
JUMLAH HARGA BAHAN 183,425.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 232,955.00


E Overhead & Profit 15.00% 34,943.25
F Harga Satuan Pekerjaan (D+E) 267,898.25

A.4.4.3.61. Pemasangan 1m2 floor harderner

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)

III - 134
A TENAGA
Pekerja L.01 OH 0.120 80,000.00 9,600.00
Tukang batu L.02 OH 0.120 110,000.00 13,200.00
Kepala tukang L.03 OH 0.012 120,000.00 1,440.00
Mandor L.04 OH 0.006 120,000.00 720.00
JUMLAH TENAGA KERJA 24,960.00

III - 135
B BAHAN
Floor harderner Kg 5.000 11,155.00 55,775.00
JUMLAH HARGA BAHAN 55,775.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 80,735.00


E Overhead & Profit 15.00% 12,110.25
F Harga Satuan Pekerjaan (D+E) 92,845.25

A.4.4.3.62. Pemasangan 1 m’ plint vynil 15cm x 30cm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.080 80,000.00 6,400.00
Tukang batu L.02 OH 0.080 110,000.00 8,800.00
Kepala tukang L.03 OH 0.008 120,000.00 960.00
Mandor L.04 OH 0.004 120,000.00 480.00
JUMLAH TENAGA KERJA 16,640.00
B BAHAN
Vynil buah 1.760 12,650.00 22,264.00
Lem Kg 0.080 25,300.00 2,024.00
JUMLAH HARGA BAHAN 24,288.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 40,928.00


E Overhead & Profit 15.00% 6,139.20
F Harga Satuan Pekerjaan (D+E) 47,067.20

A.4.4.3.63. Pemasangan 1 m’ plint kayu tebal 2 cm lebar 10 cm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.120 80,000.00 9,600.00
Tukang batu L.02 OH 0.120 110,000.00 13,200.00
Kepala tukang L.03 OH 0.012 120,000.00 1,440.00
Mandor L.04 OH 0.006 120,000.00 720.00
JUMLAH TENAGA KERJA 24,960.00
B BAHAN
Papan kayu kelas 1 M3 0.003 10,925,000.00 32,775.00
Paku/skrup 5 cm Kg 0.050 23,000.00 1,150.00
JUMLAH HARGA BAHAN 33,925.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 58,885.00


E Overhead & Profit 15.00% 8,832.75
F Harga Satuan Pekerjaan (D+E) 67,717.75

A.4.4.3.64. Pemasangan 1 m2 paving block natural tebal 6 cm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.250 80,000.00 20,000.00
Tukang batu L.02 OH 0.500 110,000.00 55,000.00
Kepala tukang L.03 OH 0.050 120,000.00 6,000.00
Mandor L.04 OH 0.001 120,000.00 156.00
JUMLAH TENAGA KERJA 81,156.00
B BAHAN
Paving block 6 cm M2 1.010 57,500.00 58,075.00
Pasir beton M3 0.050 244,375.00 12,218.75
JUMLAH HARGA BAHAN 70,293.75
C PERALATAN

III - 136
Peralatan % 0.100 70,293.75 7,029.38
JUMLAH HARGA ALAT 7,029.38

D Jumlah (A+B+C) 158,479.13


E Overhead & Profit 15.00% 23,771.87
F Harga Satuan Pekerjaan (D+E) 182,250.99

III - 137
A.4.4.3.65. Pemasangan 1 m2 paving block natural tebal 8 cm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.500 80,000.00 40,000.00
Tukang batu L.02 OH 0.500 110,000.00 55,000.00
Kepala tukang L.03 OH 0.050 120,000.00 6,000.00
Mandor L.04 OH 0.001 120,000.00 156.00
JUMLAH TENAGA KERJA 101,156.00
B BAHAN
Paving block 8 cm natural M2 1.010 71,300.00 72,013.00
Pasir beton M3 2.070 244,375.00 505,856.25
JUMLAH HARGA BAHAN 577,869.25
C PERALATAN
Peralatan % 0.100 577,869.25 57,786.93
JUMLAH HARGA ALAT 57,786.93

D Jumlah (A+B+C) 736,812.18


E Overhead & Profit 15.00% 110,521.83
F Harga Satuan Pekerjaan (D+E) 847,334.00

A.4.4.3.66. Pemasangan 1 m2 paving block berwarna tebal 6 cm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.250 80,000.00 20,000.00
Tukang batu L.02 OH 0.500 110,000.00 55,000.00
Kepala tukang L.03 OH 0.050 120,000.00 6,000.00
Mandor L.04 OH 0.001 120,000.00 156.00
JUMLAH TENAGA KERJA 81,156.00
B BAHAN
Paving block 6cm berwarna M2 1.010 65,550.00 66,205.50
Pasir beton M3 0.050 244,375.00 12,218.75
JUMLAH HARGA BAHAN 78,424.25
C PERALATAN
Peralatan % 0.100 78,424.25 7,842.43
JUMLAH HARGA ALAT 7,842.43

D Jumlah (A+B+C) 167,422.68


E Overhead & Profit 15.00% 25,113.40
F Harga Satuan Pekerjaan (D+E) 192,536.08

A.4.4.3.67. Pemasangan 1 m2 paving block berwarna tebal 8 cm

Harga Satuan (Rp) Jumlah Harga (Rp)


No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 0.500 80,000.00 40,000.00
Tukang batu L.02 OH 0.500 110,000.00 55,000.00
Kepala tukang L.03 OH 0.050 120,000.00 6,000.00
Mandor L.04 OH 0.001 120,000.00 156.00
JUMLAH TENAGA KERJA 101,156.00
B BAHAN
Paving block 8 cm berwarna M2 1.010 79,350.00 80,143.50
Pasir beton M3 2.070 244,375.00 505,856.25
JUMLAH HARGA BAHAN 585,999.75
C PERALATAN
Peralatan % 0.100 585,999.75 58,599.98
JUMLAH HARGA ALAT 58,599.98

D Jumlah (A+B+C) 745,755.73


E Overhead & Profit 15.00% 111,863.36
F Harga Satuan Pekerjaan (D+E) 857,619.08

A.4.5.1 SATUAN PEKERJAAN LANGIT-LANGIT (PLAFOND)

A.4.5.1.1. Pemasangan 1 m2 langit-langit asbes semen, tebal 4 mm, 5 mm, dan 6 mm

Harga Satuan (Rp) Jumlah Harga (Rp)


No Uraian Kode Satuan Koefisien
A TENAGA

III - 138
Pekerja L.01 OH 0.030 80,000.00 2,400.00
Tukang kayu L.02 OH 0.070 110,000.00 7,700.00
Kepala tukang L.03 OH 0.007 120,000.00 840.00
Mandor L.04 OH 0.004 120,000.00 480.00
JUMLAH TENAGA KERJA 11,420.00

III - 139
B BAHAN
Asbes semen m2 1.100 42,550.00 46,805.00
Paku tripleks kg 0.010 23,000.00 230.00
JUMLAH HARGA BAHAN 47,035.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 58,455.00


E Overhead & Profit 15.00% 8,768.25
F Harga Satuan Pekerjaan (D+E) 67,223.25

A.4.5.1.2. Pemasangan 1 m2 langit-langit akustik ukuran (30 x 30) cm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.120 80,000.00 9,600.00
Tukang kayu L.02 OH 0.120 110,000.00 13,200.00
Kepala tukang L.03 OH 0.012 120,000.00 1,440.00
Mandor L.04 OH 0.006 120,000.00 720.00
JUMLAH TENAGA KERJA 24,960.00
B BAHAN
Akustik Lembar 12.000 58,650.00 703,800.00
Paku tripleks kg 0.050 23,000.00 1,150.00
JUMLAH HARGA BAHAN 704,950.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 729,910.00


E Overhead & Profit 15.00% 109,486.50
F Harga Satuan Pekerjaan (D+E) 839,396.50

A.4.5.1.3. Pemasangan 1 m2 langit-langit akustik ukuran (30 x 60) cm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.120 80,000.00 9,600.00
Tukang kayu L.02 OH 0.120 110,000.00 13,200.00
Kepala tukang L.03 OH 0.012 120,000.00 1,440.00
Mandor L.04 OH 0.006 120,000.00 720.00
JUMLAH TENAGA KERJA 24,960.00
B BAHAN
Akustik Lembar 5.800 58,650.00 340,170.00
Paku tripleks kg 0.050 23,000.00 1,150.00
JUMLAH HARGA BAHAN 341,320.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 366,280.00


E Overhead & Profit 15.00% 54,942.00
F Harga Satuan Pekerjaan (D+E) 421,222.00

A.4.5.1.4. Pemasangan 1 m2 langit-langit akustik ukuran (60 x 120) cm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.100 80,000.00 8,000.00
Tukang kayu L.02 OH 0.100 110,000.00 11,000.00
Kepala tukang L.03 OH 0.010 120,000.00 1,200.00
Mandor L.04 OH 0.005 120,000.00 600.00
JUMLAH TENAGA KERJA 20,800.00
B BAHAN
Akustik Lembar 1.500 58,650.00 87,975.00
Paku tripleks kg 0.050 23,000.00 1,150.00
JUMLAH HARGA BAHAN 89,125.00
C PERALATAN
-
JUMLAH HARGA ALAT -

III - 140
D Jumlah (A+B+C) 109,925.00
E Overhead & Profit 15.00% 16,488.75
F Harga Satuan Pekerjaan (D+E) 126,413.75

III - 141
A.4.5.1.5. Pemasangan 1 m2 langit-langit tripleks ukuran (120 x 240) cm, tebal 3 mm, 4 mm & 6 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.100 80,000.00 8,000.00
Tukang kayu L.02 OH 0.100 110,000.00 11,000.00
Kepala tukang L.03 OH 0.010 120,000.00 1,200.00
Mandor L.04 OH 0.005 120,000.00 600.00
JUMLAH TENAGA KERJA 20,800.00
B BAHAN
Tripleks Lembar 0.375 96,600.00 36,225.00
Paku tripleks kg 0.030 23,000.00 690.00
JUMLAH HARGA BAHAN 36,915.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 57,715.00


E Overhead & Profit 15.00% 8,657.25
F Harga Satuan Pekerjaan (D+E) 66,372.25

A.4.5.1.6. Pemasangan 1 m2 langit-langit lambrisering kayu, tebal 9 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.800 80,000.00 64,000.00
Tukang kayu L.02 OH 0.800 110,000.00 88,000.00
Kepala tukang L.03 OH 0.080 120,000.00 9,600.00
Mandor L.04 OH 0.040 120,000.00 4,800.00
JUMLAH TENAGA KERJA 166,400.00
B BAHAN
Kayu papan m3 0.015 4,025,000.00 60,375.00
Paku tripleks kg 0.010 23,000.00 230.00
JUMLAH HARGA BAHAN 60,605.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 227,005.00


E Overhead & Profit 15.00% 34,050.75
F Harga Satuan Pekerjaan (D+E) 261,055.75

A.4.5.1.7. Pemasangan 1 m2 langit-langit gypsum board ukuran (120x240x9) mm, tebal 9 mm

Harga Satuan (Rp) Jumlah Harga (Rp)


No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 0.100 80,000.00 8,000.00
Tukang kayu L.02 OH 0.050 110,000.00 5,500.00
Kepala tukang L.03 OH 0.005 120,000.00 600.00
Mandor L.04 OH 0.005 120,000.00 600.00
JUMLAH TENAGA KERJA 14,700.00
B BAHAN
Gypsum board Lembar 0.364 60,375.00 21,976.50
Paku skrup kg 0.110 23,000.00 2,530.00
JUMLAH HARGA BAHAN 24,506.50
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 39,206.50


E Overhead & Profit 15.00% 5,880.98
F Harga Satuan Pekerjaan (D+E) 45,087.48

A.4.5.1.8. Pemasangan 1 m2 langit-langit akustik ukuran (60 x 120) cm berikut rangka alluminium

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)

III - 142
A TENAGA
Pekerja L.01 OH 0.500 80,000.00 40,000.00
Tukang besi L.02 OH 0.500 110,000.00 55,000.00
Kepala tukang L.03 OH 0.050 120,000.00 6,000.00
Mandor L.04 OH 0.025 120,000.00 3,000.00
JUMLAH TENAGA KERJA 104,000.00

III - 143
B BAHAN
Profil Allum "T" m 3.600 113,850.00 409,860.00
Kawat Ø 4 mm kg 0.150 40,250.00 6,037.50
Ramset Buah 1.050 230.00 241.50
Akustik 60 x 120 Lembar 1.500 58,650.00 87,975.00
JUMLAH HARGA BAHAN 504,114.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 608,114.00


E Overhead & Profit 15.00% 91,217.10
F Harga Satuan Pekerjaan (D+E) 699,331.10

A.4.5.1.9. Pemasangan 1 m’ list langit-langit kayu profil

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.050 80,000.00 4,000.00
Tukang kayu L.02 OH 0.050 110,000.00 5,500.00
Kepala tukang L.03 OH 0.005 120,000.00 600.00
Mandor L.04 OH 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 10,460.00
B BAHAN
List kayu profil m 1.05 5,520.00 5,796.00
Paku kg 0.010 23,000.00 230.00
JUMLAH HARGA BAHAN 6,026.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 16,486.00


E Overhead & Profit 15.00% 2,472.90
F Harga Satuan Pekerjaan (D+E) 18,958.90
A.4.5.1.10 Pemasangan 1 m2 rangka langit-langit besi hollow 40.40
Lihat pada kelompok Pekerjaan Besi dan Alumunium (A.9.21)

A.4.5.2. HARGA SATUAN PEKERJAAN PENUTUP ATAP


A.4.5.2.1. Pemasangan 1 m2 atap genteng palentong kecil

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.150 80,000.00 12,000.00
Tukang kayu L.03 OH 0.075 110,000.00 8,250.00
Kepala tukang L.11 OH 0.008 120,000.00 900.00
Mandor L.15 OH 0.008 120,000.00 960.00
JUMLAH TENAGA KERJA 22,110.00
B BAHAN
Genteng palentong buah 25.000 1,035.00 25,875.00
JUMLAH HARGA BAHAN 25,875.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 47,985.00


E Overhead & Profit 15.00% 7,197.75
F Harga Satuan Pekerjaan (D+E) 55,182.75

A.4.5.2.2. Pemasangan 1 m2 atap genteng kodok glazuur

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.150 80,000.00 12,000.00
Tukang kayu L.03 OH 0.075 110,000.00 8,250.00
Kepala tukang L.11 OH 0.008 120,000.00 960.00
Mandor L.15 OH 0.008 120,000.00 960.00
JUMLAH TENAGA KERJA 22,170.00
B BAHAN
Genteng kodok buah 25.000 1,610.00 40,250.00
JUMLAH HARGA BAHAN 40,250.00

III - 144
C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 62,420.00
E Overhead & Profit 15.00% 9,363.00
F Harga Satuan Pekerjaan (D+E) 71,783.00

III - 145
A.4.5.2.3. Pemasangan 1 m2 atap genteng palentong besar/super

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.150 80,000.00 12,000.00
Tukang kayu L.03 OH 0.075 110,000.00 8,250.00
Kepala tukang L.11 OH 0.008 120,000.00 960.00
Mandor L.15 OH 0.008 120,000.00 960.00
JUMLAH TENAGA KERJA 22,170.00
B BAHAN
Genteng palentong buah 12.000 1,725.00 20,700.00
JUMLAH HARGA BAHAN 20,700.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 42,870.00


E Overhead & Profit 15.00% 6,430.50
F Harga Satuan Pekerjaan (D+E) 49,300.50

A.4.5.2.4. Pemasangan 1 m’ bubung genteng palentong

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.400 80,000.00 32,000.00
Tukang kayu L.03 OH 0.200 110,000.00 22,000.00
Kepala tukang L.11 OH 0.020 120,000.00 2,400.00
Mandor L.15 OH 0.002 120,000.00 240.00
JUMLAH TENAGA KERJA 56,640.00
B BAHAN
Genteng bubung Buah 5.000 2,300.00 11,500.00
Semen Portland Kg 8.000 1,633.00 13,064.00
Pasir pasang M3 0.032 222,812.50 7,130.00
JUMLAH HARGA BAHAN 31,694.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 88,334.00


E Overhead & Profit 15.00% 13,250.10
F Harga Satuan Pekerjaan (D+E) 101,584.10

A.4.5.2.5. Pemasangan 1 m’ bubung genteng kodok glazuur

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.400 80,000.00 32,000.00
Tukang kayu L.03 OH 0.200 110,000.00 22,000.00
Kepala tukang L.11 OH 0.020 120,000.00 2,400.00
Mandor L.15 OH 0.002 120,000.00 240.00
JUMLAH TENAGA KERJA 56,640.00
B BAHAN
Genteng bubung buah 5.000 4,600.00 23,000.00
Semen Portland Kg 8.000 1,633.00 13,064.00
Pasir pasang M3 0.032 222,812.50 7,130.00
JUMLAH HARGA BAHAN 43,194.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 99,834.00


E Overhead & Profit 15.00% 14,975.10
F Harga Satuan Pekerjaan (D+E) 114,809.10

III - 146
A.4.5.2.6. Pemasangan 1 m’ bubung genteng palentong besar

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.400 80,000.00 32,000.00
Tukang kayu L.03 OH 0.200 110,000.00 22,000.00
Kepala tukang L.11 OH 0.020 120,000.00 2,400.00
Mandor L.15 OH 0.002 120,000.00 240.00
JUMLAH TENAGA KERJA 56,640.00
B BAHAN
Genteng bubung buah 4.000 6,900.00 27,600.00
Semen Portland Kg 8.000 1,633.00 13,064.00
Pasir pasang M3 0.032 222,812.50 7,130.00
JUMLAH HARGA BAHAN 47,794.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 104,434.00


E Overhead & Profit 15.00% 15,665.10
F Harga Satuan Pekerjaan (D+E) 120,099.10

A.4.5.2.7. Pemasangan 1 m2 roof light fibreglass 90 x 180

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.140 80,000.00 11,200.00
Tukang kayu L.03 OH 0.067 110,000.00 7,370.00
Kepala tukang L.11 OH 0.007 120,000.00 840.00
Mandor L.15 OH 0.007 120,000.00 840.00
JUMLAH TENAGA KERJA 20,250.00
B BAHAN
Rooflight 90 x 180 Lbr 0.600 71,300.00 42,780.00
Paku biasa ½”-1” Kg 0.050 23,000.00 1,150.00
JUMLAH HARGA BAHAN 43,930.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 64,180.00


E Overhead & Profit 15.00% 9,627.00
F Harga Satuan Pekerjaan (D+E) 73,807.00

A.4.5.2.8. Pemasangan 1 m2 atap asbes gelombang 0,92 m x 2 ,5 m x 5 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.140 80,000.00 11,200.00
Tukang kayu L.03 OH 0.075 110,000.00 8,250.00
Kepala tukang L.11 OH 0.008 120,000.00 960.00
Mandor L.15 OH 0.008 120,000.00 960.00
JUMLAH TENAGA KERJA 21,370.00
B BAHAN
Asbes gel 92 x 250 Lbr 0.500 36,800.00 18,400.00
Paku pancing 6 x 23 Kg 0.120 23,000.00 2,760.00
JUMLAH HARGA BAHAN 21,160.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 42,530.00


E Overhead & Profit 15.00% 6,379.50
F Harga Satuan Pekerjaan (D+E) 48,909.50

A.4.5.2.9. Pemasangan 1 m2 atap asbes gelombang 0,92 m x 2,25 m x 5 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA

III - 147
Pekerja L.01 OH 0.140 80,000.00 11,200.00
Tukang kayu L.03 OH 0.075 110,000.00 8,250.00
Kepala tukang L.11 OH 0.008 120,000.00 960.00
Mandor L.15 OH 0.008 120,000.00 960.00
JUMLAH TENAGA KERJA 21,370.00

III - 148
B BAHAN
Asbes gel 92 x 250 Lbr 0.600 36,800.00 22,080.00
Paku pancing 6 x 23 Kg 0.120 23,000.00 2,760.00
JUMLAH HARGA BAHAN 24,840.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 46,210.00


E Overhead & Profit 15.00% 6,931.50
F Harga Satuan Pekerjaan (D+E) 53,141.50

A.4.5.2.10. Pemasangan 1 m2 atap asbes gelombang 0,92 m x 2,00 m x 5 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.140 80,000.00 11,200.00
Tukang kayu L.03 OH 0.070 110,000.00 7,700.00
Kepala tukang L.11 OH 0.007 120,000.00 840.00
Mandor L.15 OH 0.007 120,000.00 840.00
JUMLAH TENAGA KERJA 20,580.00
B BAHAN
Asbes gel 92 x 250 Lbr 0.600 36,800.00 22,080.00
Paku pancing 6 x 23 Kg 0.120 23,000.00 2,760.00
JUMLAH HARGA BAHAN 24,840.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 45,420.00


E Overhead & Profit 15.00% 6,813.00
F Harga Satuan Pekerjaan (D+E) 52,233.00

A.4.5.2.11. Pemasangan 1 m2 atap asbes gelombang 0,92 m x 1,80 m x 5 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.140 80,000.00 11,200.00
Tukang kayu L.03 OH 0.070 110,000.00 7,700.00
Kepala tukang L.11 OH 0.007 120,000.00 840.00
Mandor L.15 OH 0.007 120,000.00 840.00
JUMLAH TENAGA KERJA 20,580.00
B BAHAN
Asbes gel 92 x 250 Lbr 0.750 36,800.00 27,600.00
Paku pancing 6 x 23 Kg 0.120 23,000.00 2,760.00
JUMLAH HARGA BAHAN 30,360.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 50,940.00


E Overhead & Profit 15.00% 7,641.00
F Harga Satuan Pekerjaan (D+E) 58,581.00

A.4.5.2.12. Pemasangan 1 m2 atap asbes gelombang 1,05 m x 3,00 m x 4 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.140 80,000.00 11,200.00
Tukang kayu L.03 OH 0.070 110,000.00 7,700.00
Kepala tukang L.11 OH 0.007 120,000.00 840.00
Mandor L.15 OH 0.007 120,000.00 840.00
JUMLAH TENAGA KERJA 20,580.00
B BAHAN
Asbes gel 92 x 250 Lbr 0.350 36,800.00 12,880.00
Paku pancing 6 x 23 Kg 0.120 23,000.00 2,760.00
JUMLAH HARGA BAHAN 15,640.00
C PERALATAN

III - 149
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 36,220.00


E Overhead & Profit 15.00% 5,433.00
F Harga Satuan Pekerjaan (D+E) 41,653.00

III - 150
A.4.5.2.13. Pemasangan 1 m2 atap asbes gelombang 1,05 m x 2,70 m x 4 mm

Harga Satuan (Rp) Jumlah Harga (Rp)


No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 0.140 80,000.00 11,200.00
Tukang kayu L.03 OH 0.070 110,000.00 7,700.00
Kepala tukang L.11 OH 0.007 120,000.00 840.00
Mandor L.15 OH 0.007 120,000.00 840.00
JUMLAH TENAGA KERJA 20,580.00
B BAHAN
Asbes gel 92 x 250 Lbr 0.420 36,800.00 15,456.00
Paku pancing 6 x 23 Kg 0.120 23,000.00 2,760.00
JUMLAH HARGA BAHAN 18,216.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 38,796.00


E Overhead & Profit 15.00% 5,819.40
F Harga Satuan Pekerjaan (D+E) 44,615.40

A.4.5.2.14. Pemasangan 1 m2 atap asbes gelombang 1,05 m x 2,40 m x 4 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.140 80,000.00 11,200.00
Tukang kayu L.03 OH 0.070 110,000.00 7,700.00
Kepala tukang L.11 OH 0.007 120,000.00 840.00
Mandor L.15 OH 0.007 120,000.00 840.00
JUMLAH TENAGA KERJA 20,580.00
B BAHAN
Asbes gel 92 x 250 Lbr 0.440 36,800.00 16,192.00
Paku pancing 6 x 23 Kg 0.120 23,000.00 2,760.00
JUMLAH HARGA BAHAN 18,952.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 39,532.00


E Overhead & Profit 15.00% 5,929.80
F Harga Satuan Pekerjaan (D+E) 45,461.80

A.4.5.2.15. Pemasangan 1 m2 atap asbes gelombang 1,05 m x 2,10 m x 4 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.140 80,000.00 11,200.00
Tukang kayu L.03 OH 0.070 110,000.00 7,700.00
Kepala tukang L.11 OH 0.007 120,000.00 840.00
Mandor L.15 OH 0.007 120,000.00 840.00
JUMLAH TENAGA KERJA 20,580.00
B BAHAN
Asbes gel 92 x 250 Lbr 0.510 36,800.00 18,768.00
Paku pancing 6 x 23 Kg 0.120 23,000.00 2,760.00
JUMLAH HARGA BAHAN 21,528.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 42,108.00


E Overhead & Profit 15.00% 6,316.20
F Harga Satuan Pekerjaan (D+E) 48,424.20

A.4.5.2.16. Pemasangan 1 m2 atap asbes gelombang 1,05 m x 1,50 m x 4 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.140 80,000.00 11,200.00

III - 151
Tukang kayu L.03 OH 0.070 110,000.00 7,700.00
Kepala tukang L.11 OH 0.007 120,000.00 840.00
Mandor L.15 OH 0.007 120,000.00 840.00
JUMLAH TENAGA KERJA 20,580.00

III - 152
B BAHAN
Asbes gel 92 x 250 Lbr 0.800 36,800.00 29,440.00
Paku pancing 6 x 23 Kg 0.120 23,000.00 2,760.00
JUMLAH HARGA BAHAN 32,200.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 52,780.00


E Overhead & Profit 15.00% 7,917.00
F Harga Satuan Pekerjaan (D+E) 60,697.00

A.4.5.2.17. Pemasangan 1 m2 atap asbes gelombang 1,08 m x 3,00 m x 6 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.140 80,000.00 11,200.00
Tukang kayu L.03 OH 0.070 110,000.00 7,700.00
Kepala tukang L.11 OH 0.007 120,000.00 840.00
Mandor L.15 OH 0.007 120,000.00 840.00
JUMLAH TENAGA KERJA 20,580.00
B BAHAN
Asbes gel 92 x 250 Lbr 0.370 36,800.00 13,616.00
Paku pancing 6 x 23 Kg 0.120 23,000.00 2,760.00
JUMLAH HARGA BAHAN 16,376.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 36,956.00


E Overhead & Profit 15.00% 5,543.40
F Harga Satuan Pekerjaan (D+E) 42,499.40

A.4.5.2.18. Pemasangan 1 m2 atap asbes gelombang 1,08 m x 2,70 m x 6 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.140 80,000.00 11,200.00
Tukang kayu L.03 OH 0.070 110,000.00 7,700.00
Kepala tukang L.11 OH 0.007 120,000.00 840.00
Mandor L.15 OH 0.007 120,000.00 840.00
JUMLAH TENAGA KERJA 20,580.00
B BAHAN
Asbes gel 92 x 250 Lbr 0.380 36,800.00 13,984.00
Paku pancing 6 x 23 Kg 0.120 23,000.00 2,760.00
JUMLAH HARGA BAHAN 16,744.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 37,324.00


E Overhead & Profit 15.00% 5,598.60
F Harga Satuan Pekerjaan (D+E) 42,922.60

A.4.5.2.19. Pemasangan 1 m2 atap asbes gelombang 1,08 m x 2,40 m x 6 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.140 80,000.00 11,200.00
Tukang kayu L.03 OH 0.070 110,000.00 7,700.00
Kepala tukang L.11 OH 0.007 120,000.00 840.00
Mandor L.15 OH 0.007 120,000.00 840.00
JUMLAH TENAGA KERJA 20,580.00
B BAHAN
Asbes gel 92 x 250 Lbr 0.460 36,800.00 16,928.00
Paku pancing 6 x 23 Kg 0.120 23,000.00 2,760.00
JUMLAH HARGA BAHAN 19,688.00
C PERALATAN

III - 153
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 40,268.00


E Overhead & Profit 15.00% 6,040.20
F Harga Satuan Pekerjaan (D+E) 46,308.20

III - 154
A.4.5.2.20. Pemasangan 1 m2 atap asbes gelombang 1,08 m x 2,10 m x 6 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.140 80,000.00 11,200.00
Tukang kayu L.03 OH 0.070 110,000.00 7,700.00
Kepala tukang L.11 OH 0.007 120,000.00 840.00
Mandor L.15 OH 0.007 120,000.00 840.00
JUMLAH TENAGA KERJA 20,580.00
B BAHAN
Asbes gel 92 x 250 Lbr 0.490 36,800.00 18,032.00
Paku pancing 6 x 23 Kg 0.120 23,000.00 2,760.00
JUMLAH HARGA BAHAN 20,792.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 41,372.00


E Overhead & Profit 15.00% 6,205.80
F Harga Satuan Pekerjaan (D+E) 47,577.80

A.4.5.2.21. Pemasangan 1 m2 atap asbes gelombang 1,08 m x 1,80 m x 6 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.140 80,000.00 11,200.00
Tukang kayu L.03 OH 0.070 110,000.00 7,700.00
Kepala tukang L.11 OH 0.007 120,000.00 840.00
Mandor L.15 OH 0.007 120,000.00 840.00
JUMLAH TENAGA KERJA 20,580.00
B BAHAN
Asbes gel 92 x 250 Lbr 0.570 36,800.00 20,976.00
Paku pancing 6 x 23 Kg 0.120 23,000.00 2,760.00
JUMLAH HARGA BAHAN 23,736.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 44,316.00


E Overhead & Profit 15.00% 6,647.40
F Harga Satuan Pekerjaan (D+E) 50,963.40

A.4.5.2.22. Pemasangan 1 m’ bubung stel gelombang 0,92 m

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.084 80,000.00 6,720.00
Tukang kayu L.03 OH 0.125 110,000.00 13,750.00
Kepala tukang L.11 OH 0.013 120,000.00 1,560.00
Mandor L.15 OH 0.004 120,000.00 480.00
JUMLAH TENAGA KERJA 22,510.00
B BAHAN
Bubung stel gel. Lbr 2.400 71,300.00 171,120.00
Paku skrup 3,5” buah 6.000 460.00 2,760.00
JUMLAH HARGA BAHAN 173,880.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 196,390.00


E Overhead & Profit 15.00% 29,458.50
F Harga Satuan Pekerjaan (D+E) 225,848.50

III - 155
A.4.5.2.23. Pemasangan 1 m’ bubung stel gelombang 1,05 m

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.084 80,000.00 6,720.00
Tukang kayu L.03 OH 0.125 110,000.00 13,750.00
Kepala tukang L.11 OH 0.013 120,000.00 1,560.00
Mandor L.15 OH 0.004 120,000.00 480.00
JUMLAH TENAGA KERJA 22,510.00
B BAHAN
Bubung stel gel. Lbr 2.100 71,300.00 149,730.00
Paku skrup 3,5” buah 6.000 460.00 2,760.00
JUMLAH HARGA BAHAN 152,490.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 175,000.00


E Overhead & Profit 15.00% 26,250.00
F Harga Satuan Pekerjaan (D+E) 201,250.00

A.4.5.2.24. Pemasangan 1 m’ bubung stel gelombang 1,08 m

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.084 80,000.00 6,720.00
Tukang kayu L.03 OH 0.125 110,000.00 13,750.00
Kepala tukang L.11 OH 0.013 120,000.00 1,560.00
Mandor L.15 OH 0.004 120,000.00 480.00
JUMLAH TENAGA KERJA 22,510.00
B BAHAN
Bubung stel gel. Lbr 2.050 71,300.00 146,165.00
Paku skrup 3,5” buah 6.000 460.00 2,760.00
JUMLAH HARGA BAHAN 148,925.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 171,435.00


E Overhead & Profit 15.00% 25,715.25
F Harga Satuan Pekerjaan (D+E) 197,150.25

A.4.5.2.25. Pemasangan 1 m’ nok paten 0,92 m

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.084 80,000.00 6,720.00
Tukang kayu L.03 OH 0.125 110,000.00 13,750.00
Kepala tukang L.11 OH 0.013 120,000.00 1,560.00
Mandor L.15 OH 0.004 120,000.00 480.00
JUMLAH TENAGA KERJA 22,510.00
B BAHAN
Nok paten 92 cm Lbr 1.200 71,300.00 85,560.00
Paku skrup 3,5” buah 6.000 460.00 2,760.00
JUMLAH HARGA BAHAN 88,320.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 110,830.00


E Overhead & Profit 15.00% 16,624.50
F Harga Satuan Pekerjaan (D+E) 127,454.50

A.4.5.2.26. Pemasangan 1 m’ nok paten 1,05 m

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.084 80,000.00 6,720.00

III - 156
Tukang kayu L.03 OH 0.125 110,000.00 13,750.00
Kepala tukang L.11 OH 0.013 120,000.00 1,560.00
Mandor L.15 OH 0.004 120,000.00 480.00
JUMLAH TENAGA KERJA 22,510.00

III - 157
B BAHAN
Nok paten 92 cm Lbr 1.200 71,300.00 85,560.00
Paku skrup 3,5” buah 6.000 460.00 2,760.00
JUMLAH HARGA BAHAN 88,320.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 110,830.00


E Overhead & Profit 15.00% 16,624.50
F Harga Satuan Pekerjaan (D+E) 127,454.50

A.4.5.2.27. Pemasangan 1 m’ nok paten 1,08 m

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.084 80,000.00 6,720.00
Tukang kayu L.03 OH 0.125 110,000.00 13,750.00
Kepala tukang L.11 OH 0.013 120,000.00 1,560.00
Mandor L.15 OH 0.004 120,000.00 480.00
JUMLAH TENAGA KERJA 22,510.00
B BAHAN
Nok paten 92 cm Lbr 1.200 71,300.00 85,560.00
Paku skrup 3,5” buah 6.000 460.00 2,760.00
JUMLAH HARGA BAHAN 88,320.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 110,830.00


E Overhead & Profit 15.00% 16,624.50
F Harga Satuan Pekerjaan (D+E) 127,454.50

A.4.5.2.28. Pemasangan 1 m’ nok stel rata 0,92 m

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.100 80,000.00 8,000.00
Tukang kayu L.03 OH 0.150 110,000.00 16,500.00
Kepala tukang L.11 OH 0.013 120,000.00 1,560.00
Mandor L.15 OH 0.004 120,000.00 480.00
JUMLAH TENAGA KERJA 26,540.00
B BAHAN
Nok paten 92 cm Lbr 1.100 71,300.00 78,430.00
Paku skrup 3,5” buah 6.000 460.00 2,760.00
JUMLAH HARGA BAHAN 81,190.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 107,730.00


E Overhead & Profit 15.00% 16,159.50
F Harga Satuan Pekerjaan (D+E) 123,889.50

A.4.5.2.29. Pemasangan 1 m’ nok stel rata 1,05 m

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.084 80,000.00 6,720.00
Tukang kayu L.03 OH 0.125 110,000.00 13,750.00
Kepala tukang L.11 OH 0.013 120,000.00 1,560.00
Mandor L.15 OH 0.004 120,000.00 480.00
JUMLAH TENAGA KERJA 22,510.00
B BAHAN
Nok paten 92 cm Lbr 1.100 71,300.00 78,430.00
Paku skrup 3,5” buah 6.000 460.00 2,760.00
JUMLAH HARGA BAHAN 81,190.00
C PERALATAN

JUMLAH HARGA ALAT -

III - 158
D Jumlah (A+B+C) 103,700.00
E Overhead & Profit 15.00% 15,555.00
F Harga Satuan Pekerjaan (D+E) 119,255.00

III - 159
A.4.5.2.30. Pemasangan 1 m2 genteng beton

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.200 80,000.00 16,000.00
Tukang kayu L.03 OH 0.100 110,000.00 11,000.00
Kepala tukang L.11 OH 0.010 120,000.00 1,200.00
Mandor L.15 OH 0.010 120,000.00 1,200.00
JUMLAH TENAGA KERJA 29,400.00
B BAHAN
Genteng beton buah 11.000 5,750.00 63,250.00
Paku biasa 2”-5” Kg 0.030 23,000.00 690.00
JUMLAH HARGA BAHAN 63,940.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 93,340.00


E Overhead & Profit 15.00% 14,001.00
F Harga Satuan Pekerjaan (D+E) 107,341.00

A.4.5.2.32. Pemasangan 1 m2 genteng metal ukuran 80 x 100 atap pelana

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.200 80,000.00 16,000.00
Tukang kayu L.03 OH 0.100 110,000.00 11,000.00
Kepala tukang L.11 OH 0.010 120,000.00 1,200.00
Mandor L.15 OH 0.001 120,000.00 120.00
JUMLAH TENAGA KERJA 28,320.00
B BAHAN
Genteng metal buah 1.300 55,200.00 71,760.00
Paku biasa ½”-1” Kg 0.200 23,000.00 4,600.00
JUMLAH HARGA BAHAN 76,360.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 104,680.00


E Overhead & Profit 15.00% 15,702.00
F Harga Satuan Pekerjaan (D+E) 120,382.00

A.4.5.2.33. Pemasangan 1 m2 genteng metal ukuran 80 x 100 atap jurai

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.200 80,000.00 16,000.00
Tukang kayu L.03 OH 0.100 110,000.00 11,000.00
Kepala tukang L.11 OH 0.010 120,000.00 1,200.00
Mandor L.15 OH 0.001 120,000.00 120.00
JUMLAH TENAGA KERJA 28,320.00
B BAHAN
Genteng metal buah 2.000 55,200.00 110,400.00
Paku biasa ½”-1” Kg 0.200 23,000.00 4,600.00
JUMLAH HARGA BAHAN 115,000.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 143,320.00


E Overhead & Profit 15.00% 21,498.00
F Harga Satuan Pekerjaan (D+E) 164,818.00

III - 160
A.4.5.2.34. Pemasangan 1 m2 atap sirap kayu

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.166 80,000.00 13,280.00
Tukang kayu L.03 OH 0.250 110,000.00 27,500.00
Kepala tukang L.11 OH 0.025 120,000.00 3,000.00
Mandor L.15 OH 0.008 120,000.00 960.00
JUMLAH TENAGA KERJA 44,740.00
B BAHAN
Sirap kayu buah 30.000 1,897.50 56,925.00
Paku biasa ½”-1” Kg 0.200 23,000.00 4,600.00
JUMLAH HARGA BAHAN 61,525.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 106,265.00


E Overhead & Profit 15.00% 15,939.75
F Harga Satuan Pekerjaan (D+E) 122,204.75

A.4.5.2.35. Pemasangan 1 m’ nok genteng beton

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.400 80,000.00 32,000.00
Tukang kayu L.03 OH 0.200 110,000.00 22,000.00
Kepala tukang L.11 OH 0.020 120,000.00 2,400.00
Mandor L.15 OH 0.020 120,000.00 2,400.00
JUMLAH TENAGA KERJA 58,800.00
B BAHAN
Nok genteng beton buah 3.500 4,600.00 16,100.00
Paku biasa ½”-1” Kg 0.050 23,000.00 1,150.00
Semen PC Kg 10.800 1,633.00 17,636.40
Pasir pasang M3 0.032 222,812.50 7,130.00
Semen warna Kg 1.000 6,900.00 6,900.00
JUMLAH HARGA BAHAN 48,916.40
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 107,716.40


E Overhead & Profit 15.00% 16,157.46
F Harga Satuan Pekerjaan (D+E) 123,873.86

A.4.5.2.37. Pemasangan 1 m’ nok genteng metal

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.250 80,000.00 20,000.00
Tukang kayu L.03 OH 0.150 110,000.00 16,500.00
Kepala tukang L.11 OH 0.015 120,000.00 1,800.00
Mandor L.15 OH 0.013 120,000.00 1,560.00
JUMLAH TENAGA KERJA 39,860.00
B BAHAN
Nok genteng metal buah 1.100 51,060.00 56,166.00
Paku biasa ½”-1” Kg 0.050 23,000.00 1,150.00
JUMLAH HARGA BAHAN 57,316.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 97,176.00


E Overhead & Profit 15.00% 14,576.40
F Harga Satuan Pekerjaan (D+E) 111,752.40

III - 161
A.4.5.2.38. Pemasangan 1 m’ nok sirap

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.125 80,000.00 10,000.00
Tukang kayu L.03 OH 0.250 110,000.00 27,500.00
Kepala tukang L.11 OH 0.025 120,000.00 3,000.00
Mandor L.15 OH 0.006 120,000.00 720.00
JUMLAH TENAGA KERJA 41,220.00
B BAHAN
Seng pelat 3" x 6” Lbr 0.400 92,000.00 36,800.00
Paku biasa ½”-1” Kg 0.050 23,000.00 1,150.00
Paku biasa 2”-5” Kg 0.050 23,000.00 1,150.00
JUMLAH HARGA BAHAN 39,100.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 80,320.00


E Overhead & Profit 15.00% 12,048.00
F Harga Satuan Pekerjaan (D+E) 92,368.00

A.4.5.2.39. Pemasangan 1 m2 atap seng gelombang

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.120 80,000.00 9,600.00
Tukang kayu L.03 OH 0.060 110,000.00 6,600.00
Kepala tukang L.11 OH 0.006 120,000.00 720.00
Mandor L.15 OH 0.006 120,000.00 720.00
JUMLAH TENAGA KERJA 17,640.00
B BAHAN
Seng gel 3”x6” Lbr 0.700 92,000.00 64,400.00
Paku biasa ½”-1” Kg 0.020 23,000.00 460.00
JUMLAH HARGA BAHAN 64,860.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 82,500.00


E Overhead & Profit 15.00% 12,375.00
F Harga Satuan Pekerjaan (D+E) 94,875.00

A.4.5.2.40. Pemasangan 1 m’nok atap seng

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.150 80,000.00 12,000.00
Tukang kayu L.03 OH 0.070 110,000.00 7,700.00
Kepala tukang L.11 OH 0.007 120,000.00 840.00
Mandor L.15 OH 0.006 120,000.00 720.00
JUMLAH TENAGA KERJA 21,260.00
B BAHAN
Seng pelat 3”x6” bjls 28 Lbr 0.300 92,000.00 27,600.00
Paku biasa ½”-1” Kg 0.040 23,000.00 920.00
JUMLAH HARGA BAHAN 28,520.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 49,780.00


E Overhead & Profit 15.00% 7,467.00
F Harga Satuan Pekerjaan (D+E) 57,247.00

III - 162
A.4.5.2.41. Pemasangan 1 m2 atap alumunium

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.150 80,000.00 12,000.00
Tukang kayu L.03 OH 0.750 110,000.00 82,500.00
Kepala tukang L.11 OH 0.080 120,000.00 9,600.00
Mandor L.15 OH 0.006 120,000.00 720.00
JUMLAH TENAGA KERJA 104,820.00
B BAHAN
Aluminium gel tebal 0,55 Lbr 1.050 156,400.00 164,220.00
Paku hak panjang 15 cm Kg 0.020 23,000.00 460.00
JUMLAH HARGA BAHAN 164,680.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 269,500.00


E Overhead & Profit 15.00% 40,425.00
F Harga Satuan Pekerjaan (D+E) 309,925.00

A.4.5.2.43. Pemasangan 1 m2 alumunium foil/sisalation

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.150 80,000.00 12,000.00
Tukang kayu L.03 OH 0.050 110,000.00 5,500.00
Kepala tukang L.11 OH 0.005 120,000.00 600.00
Mandor L.15 OH 0.008 120,000.00 960.00
JUMLAH TENAGA KERJA 19,060.00
B BAHAN
Aluminium foil M2 1.050 10,350.00 10,867.50
JUMLAH HARGA BAHAN 10,867.50
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 29,927.50


E Overhead & Profit 15.00% 4,489.13
F Harga Satuan Pekerjaan (D+E) 34,416.63

A.4.6.1 HARGA SATUAN PEKERJAAN KAYU

A.4.6.1.1. Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas I

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 7.000 80,000.00 560,000.00
Tukang kayu L.03 OH 21.000 110,000.00 2,310,000.00
Kepala tukang L.03 OH 2.100 120,000.00 252,000.00
Mandor L.04 OH 0.350 120,000.00 42,000.00
JUMLAH TENAGA KERJA 3,164,000.00
B BAHAN
Balok kayu m3 1.100 10,925,000.00 12,017,500.00
Paku 10 cm Kg 1.250 23,000.00 28,750.00
Lem kayu Kg 1.000 34,500.00 34,500.00
JUMLAH HARGA BAHAN 12,080,750.00
C PERALATAN
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 15,244,750.00


E Overhead & Profit 15.00% 2,286,712.50
F Harga Satuan Pekerjaan (D+E) 17,531,462.50

III - 163
A.4.6.1.2. Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas II atau III

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 6.000 80,000.00 480,000.00
Tukang kayu L.03 OH 18.000 110,000.00 1,980,000.00
Kepala tukang L.03 OH 1.800 120,000.00 216,000.00
Mandor L.04 OH 0.300 120,000.00 36,000.00
JUMLAH TENAGA KERJA 2,712,000.00
B BAHAN
Balok kayu m3 1.200 4,025,000.00 4,830,000.00
Paku 10 cm Kg 1.250 23,000.00 28,750.00
Lem kayu Kg 1.000 34,500.00 34,500.00
JUMLAH HARGA BAHAN 4,893,250.00
C PERALATAN
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 7,605,250.00


E Overhead & Profit 15.00% 1,140,787.50
F Harga Satuan Pekerjaan (D+E) 8,746,037.50

A.4.6.1.3. Pembuatan dan pemasangan 1 m2 pintu klamp standar, kayu kelas II

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.350 80,000.00 28,000.00
Tukang kayu L.03 OH 1.050 110,000.00 115,500.00
Kepala tukang L.03 OH 0.105 120,000.00 12,600.00
Mandor L.04 OH 0.018 120,000.00 2,160.00
JUMLAH TENAGA KERJA 158,260.00
B BAHAN
Papan kayu m3 0.040 5,750,000.00 230,000.00
Paku 5 – 7 cm Kg 0.050 23,000.00 1,150.00
JUMLAH HARGA BAHAN 231,150.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 389,410.00


E Overhead & Profit 15.00% 58,411.50
F Harga Satuan Pekerjaan (D+E) 447,821.50

A.4.6.1.4. Pembuatan dan pemasangan 1 m2 pintu klamp sederhana, kayu kelas III

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.350 80,000.00 28,000.00
Tukang kayu L.03 OH 1.050 110,000.00 115,500.00
Kepala tukang L.03 OH 0.105 120,000.00 12,600.00
Mandor L.04 OH 0.018 120,000.00 2,160.00
JUMLAH TENAGA KERJA 158,260.00
B BAHAN
Papan kayu m3 0.040 4,025,000.00 161,000.00
Paku 5 – 7 cm Kg 0.050 23,000.00 1,150.00
JUMLAH HARGA BAHAN 162,150.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 320,410.00


E Overhead & Profit 15.00% 48,061.50
F Harga Satuan Pekerjaan (D+E) 368,471.50

III - 164
A.4.6.1.5. Pembuatan dan pemasangan 1 m2 daun pintu panel, kayu kelas I atau II

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.000 80,000.00 80,000.00
Tukang kayu L.03 OH 3.000 110,000.00 330,000.00
Kepala tukang L.03 OH 0.300 120,000.00 36,000.00
Mandor L.04 OH 0.050 120,000.00 6,000.00
JUMLAH TENAGA KERJA 452,000.00
B BAHAN
Papan kayu m3 0.040 5,750,000.00 230,000.00
Lem kayu Kg 0.500 34,500.00 17,250.00
JUMLAH HARGA BAHAN 247,250.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 699,250.00


E Overhead & Profit 15.00% 104,887.50
F Harga Satuan Pekerjaan (D+E) 804,137.50

A.4.6.1.6. Pembuatan dan pemasangan 1 m2 pintu dan jendela kaca, kayu kelas I atau II

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.800 80,000.00 64,000.00
Tukang kayu L.03 OH 2.400 110,000.00 264,000.00
Kepala tukang L.03 OH 0.240 120,000.00 28,800.00
Mandor L.04 OH 0.040 120,000.00 4,800.00
JUMLAH TENAGA KERJA 361,600.00
B BAHAN
Papan kayu m3 0.024 5,750,000.00 138,000.00
Lem kayu Kg 0.300 34,500.00 10,350.00
JUMLAH HARGA BAHAN 148,350.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 509,950.00


E Overhead & Profit 15.00% 76,492.50
F Harga Satuan Pekerjaan (D+E) 586,442.50

A.4.6.1.7. Pembuatan dan pemasangan 1 m2 pintu dan jendela jalusi kayu kelas I atau II

Harga Satuan (Rp) Jumlah Harga (Rp)


No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 1.000 80,000.00 80,000.00
Tukang kayu L.03 OH 3.000 110,000.00 330,000.00
Kepala tukang L.03 OH 0.300 120,000.00 36,000.00
Mandor L.04 OH 0.050 120,000.00 6,000.00
JUMLAH TENAGA KERJA 452,000.00
B BAHAN
Papan kayu m3 0.064 5,750,000.00 368,000.00
Lem kayu Kg 0.500 34,500.00 17,250.00
JUMLAH HARGA BAHAN 385,250.00
C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 837,250.00
E Overhead & Profit 15.00% 125,587.50
F Harga Satuan Pekerjaan (D+E) 962,837.50

A.4.6.1.8. Pembuatan 1 m2 daun pintu plywood rangkap, rangka kayu kelas II tertutup (lebar sampai 90 cm)

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA

III - 165
Pekerja L.01 OH 0.700 80,000.00 56,000.00
Tukang kayu L.03 OH 2.100 110,000.00 231,000.00
Kepala tukang L.03 OH 0.210 120,000.00 25,200.00
Mandor L.04 OH 0.035 120,000.00 4,200.00
JUMLAH TENAGA KERJA 316,400.00

III - 166
B BAHAN
Papan kayu m3 0.025 5,750,000.00 143,750.00
Paku 1 cm – 2,5 cm kg 0.030 23,000.00 690.00
Lem kayu kg 0.500 34,500.00 17,250.00
Plywood tebal 4 mm Lembar 1.000 106,087.50 106,087.50
Ukuran (90 x 220) cm
JUMLAH HARGA BAHAN 267,777.50
C PERALATAN
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 584,177.50


E Overhead & Profit 15.00% 87,626.63
F Harga Satuan Pekerjaan (D+E) 671,804.13

A.4.6.1.9. Pembuatan 1 m2 pintu plywood rangkap, rangka expose kayu kelas I atau II

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.80 80,000.00 64,000.00
Tukang kayu L.03 OH 2.40 110,000.00 264,000.00
Kepala tukang L.03 OH 0.24 120,000.00 28,800.00
Mandor L.04 OH 0.04 120,000.00 4,800.00
JUMLAH TENAGA KERJA 361,600.00
B BAHAN
Papan kayu m3 0.026 5,750,000.00 147,200.00
Paku 1 cm – 2,5 cm kg 0.030 23,000.00 690.00
Lem kayu kg 0.500 34,500.00 17,250.00
Plywood 4 mm Lembar 1.000 106,087.50 106,087.50
(90 x 220) cm
JUMLAH HARGA BAHAN 271,227.50
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 632,827.50


E Overhead & Profit 15.00% 94,924.13
F Harga Satuan Pekerjaan (D+E) 727,751.63

A.4.6.1.10. Pemasangan 1 m2 jalusi kusen, kayu kelas I atau II

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.670 80,000.00 53,600.00
Tukang kayu L.03 OH 2.000 110,000.00 220,000.00
Kepala tukang L.03 OH 0.200 120,000.00 24,000.00
Mandor L.04 OH 0.335 120,000.00 40,200.00
JUMLAH TENAGA KERJA 337,800.00
B BAHAN
Papan kayu m3 0.060 5,750,000.00 345,000.00
Paku 1 – 2,5 cm kg 0.150 23,000.00 3,450.00
JUMLAH HARGA BAHAN 348,450.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 686,250.00


E Overhead & Profit 15.00% 102,937.50
F Harga Satuan Pekerjaan (D+E) 789,187.50

A.4.6.1.11. Pemasangan 1 m2 teakwood rangkap, rangka expose kayu kelas I

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.800 80,000.00 64,000.00
Tukang kayu L.03 OH 2.400 110,000.00 264,000.00
Kepala tukang L.03 OH 0.240 120,000.00 28,800.00
Mandor L.04 OH 0.040 120,000.00 4,800.00
JUMLAH TENAGA KERJA 361,600.00

III - 167
B BAHAN
Papan kayu m3 0.025 10,925,000.00 273,125.00
Paku 1 – 2,5 cm kg 0.030 23,000.00 690.00
Lem kayu kg 0.300 34,500.00 10,350.00
Teakwood 4 mm Lembar 1.000 74,750.00 74,750.00
90 x 220 cm
JUMLAH HARGA BAHAN 358,915.00
C PERALATAN
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 720,515.00


E Overhead & Profit 15.00% 108,077.25
F Harga Satuan Pekerjaan (D+E) 828,592.25

A.4.6.1.12. Pemasangan 1 m2 teakwood rangkap lapis formika, rangka expose kayu kelas II

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.850 80,000.00 68,000.00
Tukang kayu L.03 OH 2.550 110,000.00 280,500.00
Kepala tukang L.03 OH 0.255 120,000.00 30,600.00
Mandor L.04 OH 0.043 120,000.00 5,160.00
JUMLAH TENAGA KERJA 384,260.00
B BAHAN
Papan kayu m3 0.025 5,750,000.00 143,750.00
Paku 1 – 2,5 cm kg 0.030 23,000.00 690.00
Lem kayu kg 0.800 34,500.00 27,600.00
Teakwood 4 mm Lembar 1.000 74,750.00 74,750.00
90 x 220 cm
Formika Lembar 0.500 246,790.00
JUMLAH HARGA BAHAN
C PERALATAN -
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 631,050.00
E Overhead & Profit 15.00% 94,657.50
F Harga Satuan Pekerjaan (D+E) 725,707.50

A.4.6.1.13. Pemasangan 1 m3 konstruksi kuda-kuda konvensional, kayu kelas I, II dan III bentang 6 meter

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 4.000 80,000.00 320,000.00
Tukang kayu L.03 OH 12.000 110,000.00 1,320,000.00
Kepala tukang L.03 OH 1.200 120,000.00 144,000.00
Mandor L.04 OH 0.200 120,000.00 24,000.00
JUMLAH TENAGA KERJA 1,808,000.00
B BAHAN
Balok kayu m3 1.100 4,025,000.00 4,427,500.00
Besi strip tebal 5 mm kg 15.000 15,812.50 237,187.50
Paku 12 cm kg 5.600 23,000.00 128,800.00
JUMLAH HARGA BAHAN 4,793,487.50
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 6,601,487.50
E Overhead & Profit 15.00% 990,223.13
F Harga Satuan Pekerjaan (D+E) 7,591,710.63

A.4.6.1.14. Pemasangan 1 m3 konstruksi kuda-kuda expose, kayu kelas I

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 6.700 80,000.00 536,000.00
Tukang kayu L.03 OH 20.100 110,000.00 2,211,000.00
Kepala tukang L.03 OH 2.010 120,000.00 241,200.00
Mandor L.04 OH 0.335 120,000.00 40,200.00
JUMLAH TENAGA KERJA 3,028,400.00
B BAHAN
Balok kayu m3 1.200 10,925,000.00 13,110,000.00
Besi strip tebal 5 mm kg 15.000 15,812.50 237,187.50
Paku 12 cm kg 5.600 23,000.00 128,800.00

III - 168
JUMLAH HARGA BAHAN 13,475,987.50
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 16,504,387.50
E Overhead & Profit 15.00% 2,475,658.13
F Harga Satuan Pekerjaan (D+E) 18,980,045.63

III - 169
A.4.6.1.15. Pemasangan 1 m3 konstruksi gordeng, kayu kelas II

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 6.700 80,000.00 536,000.00
Tukang kayu L.03 OH 20.100 110,000.00 2,211,000.00
Kepala tukang L.03 OH 2.010 120,000.00 241,200.00
Mandor L.04 OH 0.335 120,000.00 40,200.00
JUMLAH TENAGA KERJA 3,028,400.00
B BAHAN
Balok kayu m3 1.100 5,750,000.00 6,325,000.00
Besi strip tebal 5 mm kg 15.000 15,812.50 237,187.50
Paku 12 cm kg 3.000 23,000.00 69,000.00
JUMLAH HARGA BAHAN 6,631,187.50
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 9,659,587.50


E Overhead & Profit 15.00% 1,448,938.13
F Harga Satuan Pekerjaan (D+E) 11,108,525.63

A.4.6.1.16. Pemasangan 1 m2 rangka atap genteng keramik, kayu kelas II

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.100 80,000.00 8,000.00
Tukang kayu L.03 OH 0.100 110,000.00 11,000.00
Kepala tukang L.03 OH 0.010 120,000.00 1,200.00
Mandor L.04 OH 0.005 120,000.00 600.00
JUMLAH TENAGA KERJA 20,800.00
B BAHAN
Kaso-kaso 5 x 7cm m3 0.014 5,750,000.00 80,500.00
Reng 2 x 3 cm m3 0.036 40,250.00 1,449.00
Paku 5 dan 10 cm kg 0.250 23,000.00 5,750.00
JUMLAH HARGA BAHAN 87,699.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 108,499.00


E Overhead & Profit 15.00% 16,274.85
F Harga Satuan Pekerjaan (D+E) 124,773.85

A.4.6.1.17. Pemasangan 1 m2 rangka atap genteng beton, kayu kelas II

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.100 80,000.00 8,000.00
Tukang kayu L.03 OH 0.100 110,000.00 11,000.00
Kepala tukang L.03 OH 0.010 120,000.00 1,200.00
Mandor L.04 OH 0.005 120,000.00 600.00
JUMLAH TENAGA KERJA 20,800.00
B BAHAN
Kaso-kaso 5 x 7cm m3 0.014 5,750,000.00 80,500.00
Reng (3 x 4) cm m3 0.057 40,250.00 2,294.25
Paku 5 dan 10 cm kg 0.250 23,000.00 5,750.00
JUMLAH HARGA BAHAN 88,544.25
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 109,344.25


E Overhead & Profit 15.00% 16,401.64
F Harga Satuan Pekerjaan (D+E) 125,745.89

III - 170
A.4.6.1.18. Pemasangan 1 m2 rangka atap sirap, kayu kelas II

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.120 80,000.00 9,600.00
Tukang kayu L.03 OH 0.120 110,000.00 13,200.00
Kepala tukang L.03 OH 0.012 120,000.00 1,440.00
Mandor L.04 OH 0.006 120,000.00 720.00
JUMLAH TENAGA KERJA 24,960.00
B BAHAN
Kayu kelas II m3 0.014 5,750,000.00 80,500.00
Paku 5 - 10 cm m3 0.057 23,000.00 1,311.00
JUMLAH HARGA BAHAN 81,811.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 106,771.00


E Overhead & Profit 15.00% 16,015.65
F Harga Satuan Pekerjaan (D+E) 122,786.65

A.4.6.1.19. Pemasangan 1 m2 rangka langit-langit (50 x 100) cm, kayu kelas II atau III

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.150 80,000.00 12,000.00
Tukang kayu L.03 OH 0.300 110,000.00 33,000.00
Kepala tukang L.03 OH 0.030 120,000.00 3,600.00
Mandor L.04 OH 0.075 120,000.00 9,000.00
JUMLAH TENAGA KERJA 57,600.00
B BAHAN
Kaso-kaso 5 x 7cm m3 0.015 5,750,000.00 88,550.00
Paku 7 cm – 10 cm kg 0.200 23,000.00 4,600.00
JUMLAH HARGA BAHAN 93,150.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 150,750.00


E Overhead & Profit 15.00% 22,612.50
F Harga Satuan Pekerjaan (D+E) 173,362.50

A.4.6.1.20. Pemasangan 1 m2 rangka langit-langit (60 x 60) cm, kayu kelas II atau III

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.200 80,000.00 16,000.00
Tukang kayu L.03 OH 0.300 110,000.00 33,000.00
Kepala tukang L.03 OH 0.030 120,000.00 3,600.00
Mandor L.04 OH 0.010 120,000.00 1,200.00
JUMLAH TENAGA KERJA 53,800.00
B BAHAN
Kaso-kaso 5 x 7 cm m3 0.016 5,750,000.00 93,725.00
Paku 7 – 10 cm kg 0.250 23,000.00 5,750.00
JUMLAH HARGA BAHAN 99,475.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 153,275.00


E Overhead & Profit 15.00% 22,991.25
F Harga Satuan Pekerjaan (D+E) 176,266.25

A.4.6.1.21. Pemasangan 1 m’ lisplank ukuran (3 x 20) cm, kayu kelas I atau kelas II

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.100 80,000.00 8,000.00

III - 171
Tukang kayu L.03 OH 0.200 110,000.00 22,000.00
Kepala tukang L.03 OH 0.020 120,000.00 2,400.00
Mandor L.04 OH 0.005 120,000.00 600.00
JUMLAH TENAGA KERJA 33,000.00

III - 172
B BAHAN
Papan kayu m3 0.011 5,750,000.00 62,100.00
Paku 5 dan 7 cm kg 0.100 23,000.00 2,300.00
JUMLAH HARGA BAHAN 64,400.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 97,400.00


E Overhead & Profit 15.00% 14,610.00
F Harga Satuan Pekerjaan (D+E) 112,010.00

A.4.6.1.22. Pemasangan 1 m’ lisplank ukuran (3 x 30) cm, kayu kelas I atau kelas II

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.100 80,000.00 8,000.00
Tukang kayu L.03 OH 0.200 110,000.00 22,000.00
Kepala tukang L.03 OH 0.020 120,000.00 2,400.00
Mandor L.04 OH 0.005 120,000.00 600.00
JUMLAH TENAGA KERJA 33,000.00
B BAHAN
Papan kayu m3 0.011 5,750,000.00 63,250.00
Paku 5 dan 7 cm kg 0.050 23,000.00 1,150.00
JUMLAH HARGA BAHAN 64,400.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 97,400.00


E Overhead & Profit 15.00% 14,610.00
F Harga Satuan Pekerjaan (D+E) 112,010.00

A.4.6.1.23. Pemasangan 1 m2 rangka dinding pemisah (60 x 120) cm kayu kelas II atau III

Harga Satuan (Rp) Jumlah Harga (Rp)


No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 0.150 80,000.00 12,000.00
Tukang kayu L.03 OH 0.450 110,000.00 49,500.00
Kepala tukang L.03 OH 0.045 120,000.00 5,400.00
Mandor L.04 OH 0.008 120,000.00 960.00
JUMLAH TENAGA KERJA 67,860.00
B BAHAN
Balok kayu m3 0.028 4,025,000.00 112,700.00
Paku 5 dan 7 cm kg 0.150 23,000.00 3,450.00
JUMLAH HARGA BAHAN 116,150.00
C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 184,010.00
E Overhead & Profit 15.00% 27,601.50
F Harga Satuan Pekerjaan (D+E) 211,611.50

A.4.6.1.25. Pemasangan 1 m2 dinding pemisah plywood rangkap, rangka kayu kelas II

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.200 80,000.00 16,000.00
Tukang kayu L.03 OH 0.600 110,000.00 66,000.00
Kepala tukang L.03 OH 0.060 120,000.00 7,200.00
Mandor L.04 OH 0.010 120,000.00 1,200.00
JUMLAH TENAGA KERJA 90,400.00
B BAHAN
Balok kayu, 6 x 12 m3 0.028 5,750,000.00 161,000.00
Paku 5 dan 10 kg 0.150 23,000.00 3,450.00
Plywood 4 mm, Lembar 0.860 106,087.50 91,235.25
120 x 240
Lem kayu kg 0.560 34,500.00 19,320.00

III - 173
JUMLAH HARGA BAHAN 275,005.25
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 365,405.25
E Overhead & Profit 15.00% 54,810.79
F Harga Satuan Pekerjaan (D+E) 420,216.04

III - 174
A.4.6.1.26. Pemasangan 1 m2 dinding lambrisering dari papan kayu kelas I

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.600 80,000.00 48,000.00
Tukang kayu L.03 OH 1.800 110,000.00 198,000.00
Kepala tukang L.03 OH 0.180 120,000.00 21,600.00
Mandor L.04 OH 0.030 120,000.00 3,600.00
JUMLAH TENAGA KERJA 271,200.00
B BAHAN
Papan kayu m3 0.007 10,925,000.00 76,475.00
Paku 5 dan 10 kg 0.100 23,000.00 2,300.00
Paku skrup 10 cm kg 0.150 23,000.00 3,450.00
JUMLAH HARGA BAHAN 82,225.00
C PERALATAN
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 353,425.00


E Overhead & Profit 15.00% 53,013.75
F Harga Satuan Pekerjaan (D+E) 406,438.75

A.4.6.1.27. Pemasangan 1 m2 dinding lambrisering dari plywood ukuran (120 x 240) cm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.025 80,000.00 2,000.00
Tukang kayu L.03 OH 0.075 110,000.00 8,250.00
Kepala tukang L.03 OH 0.008 120,000.00 960.00
Mandor L.04 OH 0.001 120,000.00 120.00
JUMLAH TENAGA KERJA 11,330.00
B BAHAN
Plywood 4 mm m3 0.400 106,087.50 42,435.00
Paku 1 dan 2,5 kg 0.050 23,000.00 1,150.00
JUMLAH HARGA BAHAN 43,585.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 54,915.00


E Overhead & Profit 15.00% 8,237.25
F Harga Satuan Pekerjaan (D+E) 63,152.25

A.4.6.2 HARGA SATUAN PEKERJAAN KUNCI DAN KACA

A.4.6.2.1. Pemasangan 1 buah kunci tanam antik

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.060 80,000.00 4,800.00
Tukang kayu L.02 OH 0.600 110,000.00 66,000.00
Kepala tukang L.03 OH 0.060 120,000.00 7,200.00
Mandor L.04 OH 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 78,360.00
B BAHAN
Kunci tanam antik buah 1.000 255,300.00 255,300.00
JUMLAH HARGA BAHAN 255,300.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 333,660.00


E Overhead & Profit 15.00% 50,049.00
F Harga Satuan Pekerjaan (D+E) 383,709.00

III - 175
A.4.6.2.2. Pemasangan 1 buah kunci tanam biasa

Harga Satuan (Rp) Jumlah Harga (Rp)


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0.010 80,000.00 800.00
Tukang kayu L.02 OH 0.500 110,000.00 55,000.00
Kepala tukang L.03 OH 0.050 120,000.00 6,000.00
Mandor L.04 OH 0.005 120,000.00 600.00
JUMLAH TENAGA KERJA 62,400.00
B BAHAN
Kunci tanam biasa buah 1.000 143,750.00 143,750.00
JUMLAH HARGA BAHAN 143,750.00
C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 206,150.00
E Overhead & Profit 15.00% 30,922.50
F Harga Satuan Pekerjaan (D+E) 237,072.50

A.4.6.2.3. Pemasangan 1 buah kunci kamar mandi

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.005 80,000.00 400.00
Tukang kayu L.02 OH 0.500 110,000.00 55,000.00
Kepala tukang L.03 OH 0.050 120,000.00 6,000.00
Mandor L.04 OH 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 61,760.00
B BAHAN
Kunci tanam KM buah 1.000 51,750.00 51,750.00
JUMLAH HARGA BAHAN 51,750.00
C PERALATAN
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 113,510.00


E Overhead & Profit 15.00% 17,026.50
F Harga Satuan Pekerjaan (D+E) 130,536.50

A.4.6.2.4. Pemasangan 1 buah kunci silinder

Harga Satuan (Rp) Jumlah Harga (Rp)


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0.005 80,000.00 400.00
Tukang kayu L.02 OH 0.500 110,000.00 55,000.00
Kepala tukang L.03 OH 0.050 120,000.00 6,000.00
Mandor L.04 OH 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 61,760.00
B BAHAN
Kunci silinder buah 1.000 80,500.00 80,500.00
JUMLAH HARGA BAHAN 80,500.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 142,260.00


E Overhead & Profit 15.00% 21,339.00
F Harga Satuan Pekerjaan (D+E) 163,599.00

A.4.6.2.5. Pemasangan 1 buah engsel pintu

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.015 80,000.00 1,200.00
Tukang kayu L.02 OH 0.150 110,000.00 16,500.00
Kepala tukang L.03 OH 0.015 120,000.00 1,800.00
Mandor L.04 OH 0.001 120,000.00 96.00
JUMLAH TENAGA KERJA 19,596.00
B BAHAN
Engsel pintu buah 1.000 69,000.00 69,000.00
JUMLAH HARGA BAHAN 69,000.00

III - 176
C PERALATAN
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 88,596.00


E Overhead & Profit 15.00% 13,289.40
F Harga Satuan Pekerjaan (D+E) 101,885.40

III - 177
A.4.6.2.6. Pemasangan 1 buah engsel jendela kupu-kupu

Harga Satuan (Rp) Jumlah Harga (Rp)


No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 0.010 80,000.00 800.00
Tukang kayu L.02 OH 0.100 110,000.00 11,000.00
Kepala tukang L.03 OH 0.010 120,000.00 1,200.00
Mandor L.04 OH 0.001 120,000.00 60.00
JUMLAH TENAGA KERJA 13,060.00
B BAHAN
Engsel kupu-kupu buah 1.000 28,750.00 28,750.00
JUMLAH HARGA BAHAN 28,750.00
C PERALATAN
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 41,810.00


E Overhead & Profit 15.00% 6,271.50
F Harga Satuan Pekerjaan (D+E) 48,081.50

A.4.6.2.7. Pemasangan 1 buah engsel angin

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.100 80,000.00 8,000.00
Tukang kayu L.02 OH 0.200 110,000.00 22,000.00
Kepala tukang L.03 OH 0.020 120,000.00 2,400.00
Mandor L.04 OH 0.001 120,000.00 60.00
JUMLAH TENAGA KERJA 32,460.00
B BAHAN
Engsel angin buah 1.000 23,000.00 23,000.00
JUMLAH HARGA BAHAN 23,000.00
C PERALATAN
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 55,460.00


E Overhead & Profit 15.00% 8,319.00
F Harga Satuan Pekerjaan (D+E) 63,779.00

A.4.6.2.8. Pemasangan 1 buah spring knip

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.015 80,000.00 1,200.00
Tukang kayu L.02 OH 0.150 110,000.00 16,500.00
Kepala tukang L.03 OH 0.015 120,000.00 1,800.00
Mandor L.04 OH 0.008 120,000.00 960.00
JUMLAH TENAGA KERJA 20,460.00
B BAHAN
Spring knip buah 1.000 25,300.00 25,300.00
JUMLAH HARGA BAHAN 25,300.00
C PERALATAN
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 45,760.00


E Overhead & Profit 15.00% 6,864.00
F Harga Satuan Pekerjaan (D+E) 52,624.00

A.4.6.2.9. Pemasangan 1 buah kait angin

Harga Satuan (Rp) Jumlah Harga (Rp)


No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 0.015 80,000.00 1,200.00
Tukang kayu L.02 OH 0.150 110,000.00 16,500.00
Kepala tukang L.03 OH 0.015 120,000.00 1,800.00
Mandor L.04 OH 0.008 120,000.00 960.00
JUMLAH TENAGA KERJA 20,460.00
B BAHAN
Kait angin buah 1.000 8,625.00 8,625.00
JUMLAH HARGA BAHAN 8,625.00

III - 178
C PERALATAN
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 29,085.00


E Overhead & Profit 15.00% 4,362.75
F Harga Satuan Pekerjaan (D+E) 33,447.75

III - 179
A.4.6.2.10. Pemasangan 1 buah door closer

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.050 80,000.00 4,000.00
Tukang kayu L.02 OH 0.500 110,000.00 55,000.00
Kepala tukang L.03 OH 0.050 120,000.00 6,000.00
Mandor L.04 OH 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 65,360.00
B BAHAN
Door closer set 1.000 322,000.00 322,000.00
JUMLAH HARGA BAHAN 322,000.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 387,360.00


E Overhead & Profit 15.00% 58,104.00
F Harga Satuan Pekerjaan (D+E) 445,464.00

A.4.6.2.11. Pemasangan 1 buah kunci slot (grendel)

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.020 80,000.00 1,600.00
Tukang kayu L.02 OH 0.200 110,000.00 22,000.00
Kepala tukang L.03 OH 0.020 120,000.00 2,400.00
Mandor L.04 OH 0.001 120,000.00 120.00
JUMLAH TENAGA KERJA 26,120.00
B BAHAN
Kunci slot buah 1.000 13,800.00 13,800.00
JUMLAH HARGA BAHAN 13,800.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 39,920.00


E Overhead & Profit 15.00% 5,988.00
F Harga Satuan Pekerjaan (D+E) 45,908.00

A.4.6.2.12. Pemasangan 1 buah door holder

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.050 80,000.00 4,000.00
Tukang kayu L.02 OH 0.500 110,000.00 55,000.00
Kepala tukang L.03 OH 0.050 120,000.00 6,000.00
Mandor L.04 OH 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 65,360.00
B BAHAN
Door holder buah 1.000 26,450.00 26,450.00
JUMLAH HARGA BAHAN 26,450.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 91,810.00


E Overhead & Profit 15.00% 13,771.50
F Harga Satuan Pekerjaan (D+E) 105,581.50

A.4.6.2.13. Pemasangan 1 buah door stop

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.010 80,000.00 800.00

III - 180
Tukang kayu L.02 OH 0.100 110,000.00 11,000.00
Kepala tukang L.03 OH 0.010 120,000.00 1,200.00
Mandor L.04 OH 0.005 120,000.00 600.00
JUMLAH TENAGA KERJA 13,600.00

III - 181
B BAHAN
Door stop buah 1.000 46,000.00 46,000.00
JUMLAH HARGA BAHAN 46,000.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 59,600.00


E Overhead & Profit 15.00% 8,940.00
F Harga Satuan Pekerjaan (D+E) 68,540.00

A.4.6.2.14. Pemasangan 1 buah rel pintu sorong

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.060 80,000.00 4,800.00
Tukang kayu L.02 OH 0.600 110,000.00 66,000.00
Kepala tukang L.03 OH 0.060 120,000.00 7,200.00
Mandor L.04 OH 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 78,360.00
B BAHAN
Rel pintu sorong Set 1.000 402,500.00 402,500.00
JUMLAH HARGA BAHAN 402,500.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 480,860.00


E Overhead & Profit 15.00% 72,129.00
F Harga Satuan Pekerjaan (D+E) 552,989.00

A.4.6.2.15. Pemasangan 1 buah kunci lemari

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.025 80,000.00 2,000.00
Tukang kayu L.02 OH 0.250 110,000.00 27,500.00
Kepala tukang L.03 OH 0.025 120,000.00 3,000.00
Mandor L.04 OH 0.001 120,000.00 120.00
JUMLAH TENAGA KERJA 32,620.00
B BAHAN
Kunci lemari Set 1.000 163,300.00 163,300.00
JUMLAH HARGA BAHAN 163,300.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 195,920.00


E Overhead & Profit 15.00% 29,388.00
F Harga Satuan Pekerjaan (D+E) 225,308.00

A.4.6.2.16. Pemasangan 1 m2 kaca tebal 3 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.015 80,000.00 1,200.00
Tukang kayu L.02 OH 0.150 110,000.00 16,500.00
Kepala tukang L.03 OH 0.015 120,000.00 1,800.00
Mandor L.04 OH 0.001 120,000.00 96.00
JUMLAH TENAGA KERJA 19,596.00
B BAHAN
Kaca tebal 3 mm m2 1.100 72,737.50 80,011.25
Sealant Kg 0.050 48,300.00 2,415.00
JUMLAH HARGA BAHAN 82,426.25
C PERALATAN

JUMLAH HARGA ALAT -

III - 182
D Jumlah (A+B+C) 102,022.25
E Overhead & Profit 15.00% 15,303.34
F Harga Satuan Pekerjaan (D+E) 117,325.59

III - 183
A.4.6.2.17. Pemasangan 1 m2 kaca tebal 5 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.015 80,000.00 1,200.00
Tukang kayu L.02 OH 0.150 110,000.00 16,500.00
Kepala tukang L.03 OH 0.015 120,000.00 1,800.00
Mandor L.04 OH 0.001 120,000.00 96.00
JUMLAH TENAGA KERJA 19,596.00
B BAHAN
Kaca tebal 5 mm m2 1.100 86,250.00 94,875.00
Sealant Kg 0.050 48,300.00 2,415.00
JUMLAH HARGA BAHAN 97,290.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 116,886.00


E Overhead & Profit 15.00% 17,532.90
F Harga Satuan Pekerjaan (D+E) 134,418.90

A.4.6.2.18. Pemasangan 1 m2 kaca tebal 8 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.017 80,000.00 1,360.00
Tukang kayu L.02 OH 0.170 110,000.00 18,700.00
Kepala tukang L.03 OH 0.017 120,000.00 2,040.00
Mandor L.04 OH 0.001 120,000.00 108.00
JUMLAH TENAGA KERJA 22,208.00
B BAHAN
Kaca tebal 8 mm m2 1.100 172,500.00 189,750.00
Sealant Kg 0.070 48,300.00 3,381.00
JUMLAH HARGA BAHAN 193,131.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 215,339.00


E Overhead & Profit 15.00% 32,300.85
F Harga Satuan Pekerjaan (D+E) 247,639.85

A.4.6.2.19. Pemasangan 1 m2 kaca buram tebal 12 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.025 80,000.00 2,000.00
Tukang kayu L.02 OH 0.250 110,000.00 27,500.00
Kepala tukang L.03 OH 0.025 120,000.00 3,000.00
Mandor L.04 OH 0.001 120,000.00 156.00
JUMLAH TENAGA KERJA 32,656.00
B BAHAN
Kaca buram 12 mm m2 1.100 414,575.00 456,032.50
Sealant Kg 0.070 48,300.00 3,381.00
JUMLAH HARGA BAHAN 459,413.50
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 492,069.50


E Overhead & Profit 15.00% 73,810.43
F Harga Satuan Pekerjaan (D+E) 565,879.93

A.4.6.2.20. Pemasangan 1 m2 kaca cermin tebal 5 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA

III - 184
Pekerja L.01 OH 0.015 80,000.00 1,200.00
Tukang kayu L.02 OH 0.150 110,000.00 16,500.00
Kepala tukang L.03 OH 0.015 120,000.00 1,800.00
Mandor L.04 OH 0.008 120,000.00 960.00
JUMLAH TENAGA KERJA 20,460.00

III - 185
B BAHAN
Kaca cermin 5 mm m2 1.100 155,250.00 170,775.00
JUMLAH HARGA BAHAN 170,775.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 191,235.00


E Overhead & Profit 15.00% 28,685.25
F Harga Satuan Pekerjaan (D+E) 219,920.25

A.4.6.2.21. Pemasangan 1 m2 kaca cermin tebal 8 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.017 80,000.00 1,360.00
Tukang kayu L.02 OH 0.170 110,000.00 18,700.00
Kepala tukang L.03 OH 0.017 120,000.00 2,040.00
Mandor L.04 OH 0.009 120,000.00 1,080.00
JUMLAH TENAGA KERJA 23,180.00
B BAHAN
Kaca cermin 8 mm m2 1.100 296,355.00 325,990.50
JUMLAH HARGA BAHAN 325,990.50
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 349,170.50


E Overhead & Profit 15.00% 52,375.58
F Harga Satuan Pekerjaan (D+E) 401,546.08

A.4.6.2.22. Pemasangan 1 m2 kaca wireglassed tebal 5 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.015 80,000.00 1,200.00
Tukang kayu L.02 OH 0.150 110,000.00 16,500.00
Kepala tukang L.03 OH 0.015 120,000.00 1,800.00
Mandor L.04 OH 0.008 120,000.00 960.00
JUMLAH TENAGA KERJA 20,460.00
B BAHAN
Kaca wireglassed 5 mm m2 1.100 241,500.00 265,650.00
JUMLAH HARGA BAHAN 265,650.00

C PERALATAN
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 286,110.00


E Overhead & Profit 15.00% 42,916.50
F Harga Satuan Pekerjaan (D+E) 329,026.50

A.4.6.2.23. Pemasangan 1 m2 kaca patri tebal 5 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.075 80,000.00 6,000.00
Tukang kayu L.02 OH 0.150 110,000.00 16,500.00
Kepala tukang L.03 OH 0.015 120,000.00 1,800.00
Mandor L.04 OH 0.004 120,000.00 480.00
JUMLAH TENAGA KERJA 24,780.00
B BAHAN
Kaca patri 5mm m2 1.100 2,300,000.00 2,530,000.00
Sealant Kg 0.050 48,300.00 2,415.00
JUMLAH HARGA BAHAN 2,532,415.00

C PERALATAN
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 2,557,195.00

III - 186
E Overhead & Profit 15.00% 383,579.25
F Harga Satuan Pekerjaan (D+E) 2,940,774.25

III - 187
A.4.7.1 HARGA SATUAN PEKERJAAN PENGECATAN
A.4.7.1.1. 1 m2 Pengikisan/pengerokan permukaan cat lama
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.150 80,000.00 12,000.00
Mandor L.04 OH 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 12,360.00
B BAHAN
Soda api Kg 0.050 28,750.00 1,437.50
JUMLAH HARGA BAHAN 1,437.50
C PERALATAN
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 13,797.50


E Overhead & Profit 15.00% 2,069.63
F Harga Satuan Pekerjaan (D+E) 15,867.13

A.4.7.1.2. 1 m2 Pencucian bidang permukaan tembok yang pernah dicat


Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.150 80,000.00 12,000.00
Mandor L.04 OH 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 12,360.00
B BAHAN
Sabun Kg 0.050 12,650.00 632.50
JUMLAH HARGA BAHAN 632.50
C PERALATAN
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 12,992.50


E Overhead & Profit 15.00% 1,948.88
F Harga Satuan Pekerjaan (D+E) 14,941.38

A.4.7.1.3. 1 m2 Pengerokan karat pada permukaan baja cara manual


Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.150 80,000.00 12,000.00
Mandor L.04 OH 0.008 120,000.00 960.00
JUMLAH TENAGA KERJA 12,960.00
B BAHAN
Sabun Kg 0.050 12,650.00 632.50
JUMLAH HARGA BAHAN 632.50
C PERALATAN
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 13,592.50


E Overhead & Profit 15.00% 2,038.88
F Harga Satuan Pekerjaan (D+E) 15,631.38

A.4.7.1.4. 1 m2 Pengecatan bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.070 80,000.00 5,600.00
Tukang cat L.02 OH 0.009 110,000.00 990.00
Kepala tukang L.03 OH 0.006 120,000.00 720.00
Mandor L.04 OH 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 7,670.00
B BAHAN
Cat menie Kg 0.200 50,600.00 10,120.00
Plamuur Kg 0.150 23,000.00 3,450.00
Cat dasar Kg 0.170 50,600.00 8,602.00
Cat penutup (setara avian) Kg 0.260 55,200.00 14,352.00
Kuas buah 0.010 13,800.00 138.00
Pengencer Kg 0.030 27,600.00 828.00
Ampelas Lbr 0.200 3,450.00 690.00
JUMLAH HARGA BAHAN 38,180.00
C PERALATAN
JUMLAH HARGA ALAT -

III - 188
D Jumlah (A+B+C) 45,850.00
E Overhead & Profit 15.00% 6,877.50
F Harga Satuan Pekerjaan (D+E) 52,727.50

III - 189
A.4.7.1.5. Pengecatan 1 m2 bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 3 lapis cat penutup)

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.070 80,000.00 5,600.00
Tukang cat L.02 OH 0.105 110,000.00 11,550.00
Kepala tukang L.03 OH 0.004 120,000.00 480.00
Mandor L.04 OH 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 17,990.00
B BAHAN
Cat menie Kg 0.200 50,600.00 10,120.00
Plamuur Kg 0.150 23,000.00 3,450.00
Cat dasar Kg 0.170 50,600.00 8,602.00
Cat penutup (setara avian) Kg 0.350 55,200.00 19,320.00
Kuas buah 0.010 13,800.00 138.00
Pengencer Kg 0.030 27,600.00 828.00
Ampelas Lbr 0.200 3,450.00 690.00
JUMLAH HARGA BAHAN 43,148.00
C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 61,138.00
E Overhead & Profit 15.00% 9,170.70
F Harga Satuan Pekerjaan (D+E) 70,308.70

A.4.7.1.6. Pelaburan 1 m2 bidang kayu dengan teak oil

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.040 80,000.00 3,200.00
Tukang cat L.02 OH 0.063 110,000.00 6,930.00
Kepala tukang L.03 OH 0.063 120,000.00 7,560.00
Mandor L.04 OH 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 18,050.00
B BAHAN
Teak oil L 0.360 34,787.50 12,523.50
JUMLAH HARGA BAHAN 12,523.50
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 30,573.50


E Overhead & Profit 15.00% 4,586.03
F Harga Satuan Pekerjaan (D+E) 35,159.53

A.4.7.1.7. Pelaburan 1 m2 bidang kayu dengan politur

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.040 80,000.00 3,200.00
Tukang cat L.02 OH 0.060 110,000.00 6,600.00
Kepala tukang L.03 OH 0.016 120,000.00 1,920.00
Mandor L.04 OH 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 12,080.00
B BAHAN
Politur L 0.150 43,642.50 6,546.38
Politur jadi L 0.372 49,565.00 18,438.18
Ampelas Lbr 2.000 3,450.00 6,900.00
JUMLAH HARGA BAHAN 31,884.56
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 43,964.56


E Overhead & Profit 15.00% 6,594.68
F Harga Satuan Pekerjaan (D+E) 50,559.24

III - 190
A.4.7.1.8. Pelaburan 1 m2 bidang kayu dengan cat residu dan ter

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.100 80,000.00 8,000.00
Mandor L.04 OH 0.006 120,000.00 720.00
JUMLAH TENAGA KERJA 8,720.00
B BAHAN
Residu atau ter L 0.350 31,625.00 11,068.75
JUMLAH HARGA BAHAN 11,068.75
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 19,788.75


E Overhead & Profit 15.00% 2,968.31
F Harga Satuan Pekerjaan (D+E) 22,757.06

A.4.7.1.9. Pelaburan 1 m2 bidang kayu dengan vernis

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.160 80,000.00 12,800.00
Tukang cat L.02 OH 0.160 110,000.00 17,600.00
Kepala tukang L.03 OH 0.016 120,000.00 1,920.00
Mandor L.04 OH 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 32,680.00
B BAHAN
Vernis L 0.150 39,847.50 5,977.13
Dempul Kg 0.050 21,275.00 1,063.75
Ampelas Lbr 0.100 3,450.00 345.00
JUMLAH HARGA BAHAN 7,385.88
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 40,065.88


E Overhead & Profit 15.00% 6,009.88
F Harga Satuan Pekerjaan (D+E) 46,075.76

A.4.7.1.10. Pengecatan 1 m2 tembok baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.020 80,000.00 1,600.00
Tukang cat L.02 OH 0.063 110,000.00 6,930.00
Kepala tukang L.03 OH 0.006 120,000.00 756.00
Mandor L.04 OH 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 9,646.00
B BAHAN
Plamuur Kg 0.100 80,500.00 8,050.00
Cat dasar Kg 0.100 50,600.00 5,060.00
Cat penutup Kg 0.260 28,750.00 7,475.00
JUMLAH HARGA BAHAN 20,585.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 30,231.00


E Overhead & Profit 15.00% 4,534.65
F Harga Satuan Pekerjaan (D+E) 34,765.65

A.4.7.1.11. Pengecatan 1 m2 tembok lama (1 lapis cat dasar, 2 lapis cat penutup)

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.028 80,000.00 2,240.00
Tukang cat L.02 OH 0.042 110,000.00 4,620.00

III - 191
Kepala tukang L.03 OH 0.004 120,000.00 504.00
Mandor L.04 OH 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 7,724.00

III - 192
B BAHAN
Cat dasar Kg 0.120 50,600.00 6,072.00
Cat penutup Kg 0.180 28,750.00 5,175.00
JUMLAH HARGA BAHAN 11,247.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 18,971.00


E Overhead & Profit 15.00% 2,845.65
F Harga Satuan Pekerjaan (D+E) 21,816.65

A.4.7.1.12. Pelaburan 1 m2 tembok dengan kalkarium

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.028 80,000.00 2,240.00
Tukang cat L.02 OH 0.042 110,000.00 4,620.00
Kepala tukang L.03 OH 0.004 120,000.00 504.00
Mandor L.04 OH 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 7,724.00
B BAHAN
Kalkarium Kg 0.100 21,275.00 2,127.50
JUMLAH HARGA BAHAN 2,127.50
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 9,851.50


E Overhead & Profit 15.00% 1,477.73
F Harga Satuan Pekerjaan (D+E) 11,329.23

A.4.7.1.13. Pelaburan 1 m2 tembok dengan kapur sirih

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.150 80,000.00 12,000.00
Tukang cat L.02 OH 0.001 110,000.00 110.00
Kepala tukang L.03 OH 0.000 120,000.00 12.00
Mandor L.04 OH 0.003 120,000.00 300.00
JUMLAH TENAGA KERJA 12,422.00
B BAHAN
Kapur sirih Kg 0.150 2,300.00 345.00
Ampelas Lbr 0.100 3,450.00 345.00
Alang-alang Ikat 0.250 11,500.00 2,875.00
JUMLAH HARGA BAHAN 3,565.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 15,987.00


E Overhead & Profit 15.00% 2,398.05
F Harga Satuan Pekerjaan (D+E) 18,385.05

A.4.7.1.14. Pelaburan 1 m2 tembok lama dengan kapur sirih (pemeliharaan)

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.040 80,000.00 3,200.00
Tukang cat L.02 OH 0.005 110,000.00 550.00
Kepala tukang L.03 OH 0.001 120,000.00 60.00
Mandor L.04 OH 0.003 120,000.00 300.00
JUMLAH TENAGA KERJA 4,110.00
B BAHAN
Kapur sirih Kg 0.300 2,300.00 690.00
Ampelas Lbr 0.200 3,450.00 690.00
Alang-alang Ikat 0.250 11,500.00 2,875.00
JUMLAH HARGA BAHAN 4,255.00
C PERALATAN

III - 193
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 8,365.00


E Overhead & Profit 15.00% 1,254.75
F Harga Satuan Pekerjaan (D+E) 9,619.75

III - 194
A.4.7.1.15. Pemasangan 1 m2 wallpaper

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.020 80,000.00 1,600.00
Tukang cat L.02 OH 0.200 110,000.00 22,000.00
Kepala tukang L.03 OH 0.020 120,000.00 2,400.00
Mandor L.04 OH 0.003 120,000.00 300.00
JUMLAH TENAGA KERJA 26,300.00
B BAHAN
Wall paper m2 1.200 80,500.00 96,600.00
Lem Kg 0.200 25,300.00 5,060.00
JUMLAH HARGA BAHAN 101,660.00
C PERALATAN
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 127,960.00


E Overhead & Profit 15.00% 19,194.00
F Harga Satuan Pekerjaan (D+E) 147,154.00

A.4.7.1.16. Pengecatan 1 m2 permukaan baja dengan menie besi

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.020 80,000.00 1,600.00
Tukang cat L.02 OH 0.200 110,000.00 22,000.00
Kepala tukang L.03 OH 0.020 120,000.00 2,400.00
Mandor L.04 OH 0.003 120,000.00 300.00
JUMLAH TENAGA KERJA 26,300.00
B BAHAN
Menie besi Kg 0.100 50,600.00 5,060.00
Kwas buah 0.010 13,800.00 138.00
JUMLAH HARGA BAHAN 5,198.00
C PERALATAN
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 31,498.00


E Overhead & Profit 15.00% 4,724.70
F Harga Satuan Pekerjaan (D+E) 36,222.70

A.4.7.1.17. Pengecatan 1 m2 permukaan baja dengan menie besi dengan perancah

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.250 80,000.00 20,000.00
Tukang cat L.02 OH 0.225 110,000.00 24,750.00
Kepala tukang L.02 OH 0.023 120,000.00 2,700.00
Mandor L.04 OH 0.008 120,000.00 900.00
JUMLAH TENAGA KERJA 48,350.00
B BAHAN
Menie besi Kg 0.100 50,600.00 5,060.00
Pengencer L 0.010 27,600.00 276.00
Kwas buah 0.010 13,800.00 138.00
Perancah kayu m3 0.002 4,025,000.00 8,050.00
JUMLAH HARGA BAHAN 13,524.00
C PERALATAN
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 61,874.00


E Overhead & Profit 15.00% 9,281.10
F Harga Satuan Pekerjaan (D+E) 71,155.10

A.4.7.1.18. Pengecatan 1 m2 permukaan baja galvanis secara manual 4 lapis

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.250 80,000.00 20,000.00

III - 195
Tukang cat L.02 OH 0.250 110,000.00 27,500.00
Kepala tukang L.03 OH 0.025 120,000.00 3,000.00
Mandor L.04 OH 0.001 120,000.00 156.00
JUMLAH TENAGA KERJA 50,656.00

III - 196
B BAHAN
Menie A Kg 0.100 50,600.00 5,060.00
Menie B Kg 0.100 50,600.00 5,060.00
Cat Kg 0.080 63,250.00 5,060.00
Kwas buah 0.010 13,800.00 138.00
Pengencer L 0.010 27,600.00 276.00
JUMLAH HARGA BAHAN 15,594.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 66,250.00


E Overhead & Profit 15.00% 9,937.50
F Harga Satuan Pekerjaan (D+E) 76,187.50

A.4.7.1.19. Pengecatan 1 m2 permukaan baja galvanis secara manual sistem 1 lapis cat mutakhir

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.060 80,000.00 4,800.00
Tukang cat L.02 OH 0.060 110,000.00 6,600.00
Kepala tukang L.03 OH 0.012 120,000.00 1,440.00
Mandor L.04 OH 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 13,200.00
B BAHAN
Cat Kg 0.300 63,250.00 18,975.00
Kwas buah 0.010 13,800.00 138.00
Pengencer L 0.010 27,600.00 276.00
JUMLAH HARGA BAHAN 19,389.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 32,589.00


E Overhead & Profit 15.00% 4,888.35
F Harga Satuan Pekerjaan (D+E) 37,477.35

A.4.7.1.20. Pengecatan 1 m2 permukaan baja galvanis secara manual sistem 3 lapis

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.400 80,000.00 32,000.00
Tukang cat L.02 OH 0.800 110,000.00 88,000.00
Kepala tukang L.03 OH 0.080 120,000.00 9,600.00
Mandor L.04 OH 0.020 120,000.00 2,400.00
JUMLAH TENAGA KERJA 132,000.00
B BAHAN
Cat dasar Kg 0.110 50,600.00 5,566.00
Cat antara Kg 0.170 40,250.00 6,842.50
Cat penutup Kg 0.080 63,250.00 5,060.00
Kwas buah 0.010 13,800.00 138.00
Pengencer L 0.010 27,600.00 276.00
JUMLAH HARGA BAHAN 17,882.50
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 149,882.50


E Overhead & Profit 15.00% 22,482.38
F Harga Satuan Pekerjaan (D+E) 172,364.88

A.4.7.1.21. Pengecatan 1 m2 permukaan baja galvanis secara semprot sistem 3 lapis cat mutakhir

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.400 80,000.00 32,000.00
Tukang cat L.02 OH 0.700 110,000.00 77,000.00
Kepala tukang L.03 OH 0.070 120,000.00 8,400.00

III - 197
Mandor L.04 OH 0.020 120,000.00 2,400.00
JUMLAH TENAGA KERJA 119,800.00
B BAHAN
Cat dasar Kg 0.300 50,600.00 15,180.00
Pengencer L 0.010 27,600.00 276.00
JUMLAH HARGA BAHAN 15,456.00

III - 198
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 135,256.00


E Overhead & Profit 15.00% 20,288.40
F Harga Satuan Pekerjaan (D+E) 155,544.40

A.4.7.1.22. Plituran 10 m2 dengan plitur melamic

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 2.000 80,000.00 160,000.00
Tukang cat L.02 OH 12.000 110,000.00 1,320,000.00
Kepala tukang L.03 OH 1.200 120,000.00 144,000.00
Mandor L.04 OH 0.100 120,000.00 12,000.00
JUMLAH TENAGA KERJA 1,636,000.00
B BAHAN
Wood filler kg 1.500 29,900.00 44,850.00
Woodstain kg 1.500 54,050.00 81,075.00
Sanding kg 1.500 55,200.00 82,800.00
Melamic kg 2.400 50,025.00 120,060.00
Thinner L 2.000 13,225.00 26,450.00
Ampelas Lbr 6.000 3,450.00 20,700.00
Lbr JUMLAH HARGA BAHAN 375,935.00
C PERALATAN
Compressor jam 78,556.50 -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 2,011,935.00


E Overhead & Profit 15.00% 301,790.25
F Harga Satuan Pekerjaan (D+E) 2,313,725.25

A.5.1.1 HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG


A.5.1.1.1. (K3) Pemasangan 1 buah closet duduk/monoblock

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 3.300 80,000.00 264,000.00
Tukang batu L.02 OH 1.100 110,000.00 121,000.00
Kepala tukang L.03 OH 0.010 120,000.00 1,200.00
Mandor L.04 OH 0.160 120,000.00 19,200.00
JUMLAH TENAGA KERJA 405,400.00
B BAHAN
Closet duduk Unit 1.000 1,422,550.00 1,422,550.00
Perlengkapan Ls 6% x closet 85,353.00 85,353.00
JUMLAH HARGA BAHAN 1,507,903.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 1,913,303.00


E Overhead & Profit 15.00% 286,995.45
F Harga Satuan Pekerjaan (D+E) 2,200,298.45

A.5.1.1 2. Pemasangan 1 buah closet jongkok porselen

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
TENAGA
Pekerja L.01 OH 1.000 80,000.00 80,000.00
Tukang batu L.02 OH 1.500 110,000.00 165,000.00
Kepala tukang L.03 OH 0.150 120,000.00 18,000.00
Mandor L.04 OH 0.160 120,000.00 19,200.00
JUMLAH TENAGA KERJA 282,200.00
B BAHAN
Closet jongkok Unit 1.000 161,000.00 161,000.00
Semen Portland Kg 6.000 1,633.00 9,798.00
Pasir pasang M3 0.010 222,812.50 2,228.13
JUMLAH HARGA BAHAN 173,026.13
C PERALATAN

III - 199
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 455,226.13


E Overhead & Profit 15.00% 68,283.92
F Harga Satuan Pekerjaan (D+E) 523,510.04

III - 200
A.5.1.1 3. Pemasangan 1 buah closet jongkok teraso

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.000 80,000.00 80,000.00
Tukang batu L.02 OH 1.500 110,000.00 165,000.00
Kepala tukang L.03 OH 0.150 120,000.00 18,000.00
Mandor L.04 OH 0.050 120,000.00 6,000.00
JUMLAH TENAGA KERJA 269,000.00
B BAHAN
Closet jongkok Unit 1.000 115,000.00 115,000.00
Semen Portland Kg 6.000 1,633.00 9,798.00
Pasir pasang M3 0.010 222,812.50 2,228.13
Bata merah buah 7.000 900.00 6,300.00
JUMLAH HARGA BAHAN 133,326.13
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 402,326.13


E Overhead & Profit 15.00% 60,348.92
F Harga Satuan Pekerjaan (D+E) 462,675.04

A.5.1.1 4. (K3) Pemasangan 1 buah urinoir

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.000 80,000.00 80,000.00
Tukang batu L.02 OH 1.000 110,000.00 110,000.00
Kepala tukang L.03 OH 0.100 120,000.00 12,000.00
Mandor L.04 OH 0.050 120,000.00 6,000.00
JUMLAH TENAGA KERJA 208,000.00
B BAHAN
Urinoir Unit 1.000 746,350.00 746,350.00
Semen Portland Kg 6.000 1,633.00 9,798.00
Pasir pasang M3 0.010 222,812.50 2,228.13
Perlengkapan % 0.300 223,905.00 223,905.00
JUMLAH HARGA BAHAN 982,281.13
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 1,190,281.13


E Overhead & Profit 15.00% 178,542.17
F Harga Satuan Pekerjaan (D+E) 1,368,823.29

A.5.1.1 5. (K3) Pemasangan 1 buah wastafel

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.200 80,000.00 96,000.00
Tukang batu L.02 OH 1.450 110,000.00 159,500.00
Kepala tukang L.03 OH 0.150 120,000.00 18,000.00
Mandor L.04 OH 0.060 120,000.00 7,200.00
JUMLAH TENAGA KERJA 280,700.00
B BAHAN
Wastafel Unit 1.200 788,900.00 946,680.00
Semen Portland Kg 6.000 1,633.00 9,798.00
Pasir pasang M3 0.010 222,812.50 2,228.13
Perlengkapan % 0.120 113,601.60 113,601.60
JUMLAH HARGA BAHAN 1,072,307.73
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 1,353,007.73


E Overhead & Profit 15.00% 202,951.16
F Harga Satuan Pekerjaan (D+E) 1,555,958.88

III - 201
A.5.1.1 7. (K3) Pemasangan 1 buah bak fiberglass vol 1 m3

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 3.000 80,000.00 240,000.00
Tukang batu L.02 OH 4.500 110,000.00 495,000.00
Kepala tukang L.03 OH 0.050 120,000.00 6,000.00
Mandor L.04 OH 0.900 120,000.00 108,000.00
JUMLAH TENAGA KERJA 849,000.00
B BAHAN
Bak fiberglass Unit 1.000 253,000.00 253,000.00
Perlengkapan Ls 0.120 30,360.00 30,360.00
JUMLAH HARGA BAHAN 283,360.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 1,132,360.00


E Overhead & Profit 15.00% 169,854.00
F Harga Satuan Pekerjaan (D+E) 1,302,214.00

A.5.1.1 9. Pemasangan 1 buah bak mandi teraso vol 0,30 m3

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 3.000 80,000.00 240,000.00
Tukang batu L.02 OH 4.500 110,000.00 495,000.00
Kepala tukang L.03 OH 0.050 120,000.00 6,000.00
Mandor L.04 OH 0.900 120,000.00 108,000.00
JUMLAH TENAGA KERJA 849,000.00
B BAHAN
Bak fiberglass Unit 1.000 253,000.00 253,000.00
Perlengkapan Ls 0.120 30,360.00 30,360.00
JUMLAH HARGA BAHAN 283,360.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 1,132,360.00


E Overhead & Profit 15.00% 169,854.00
F Harga Satuan Pekerjaan (D+E) 1,302,214.00

A.5.1.1 10. Pemasangan 1 buah bak air fiberglass vol 1 m3

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.300 80,000.00 24,000.00
Tukang batu L.02 OH 0.450 110,000.00 49,500.00
Kepala tukang L.03 OH 0.045 120,000.00 5,400.00
Mandor L.04 OH 0.015 120,000.00 1,800.00
JUMLAH TENAGA KERJA 80,700.00
B BAHAN
Bak air fiberglass Unit 1.000 253,000.00 253,000.00
Perlengkapan % 0.120 30,360.00 30,360.00
JUMLAH HARGA BAHAN 283,360.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 364,060.00


E Overhead & Profit 15.00% 54,609.00
F Harga Satuan Pekerjaan (D+E) 418,669.00

A.5.1.1 12. Pemasangan 1 buah bak cuci piring stainlessteel

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA

III - 202
Pekerja L.01 OH 0.030 80,000.00 2,400.00
Tukang batu L.02 OH 0.300 110,000.00 33,000.00
Kepala tukang L.03 OH 0.030 120,000.00 3,600.00
Mandor L.04 OH 0.015 120,000.00 1,800.00
JUMLAH TENAGA KERJA 40,800.00

III - 203
B BAHAN
Bak cuci piring Unit 1.000 460,000.00 460,000.00
Waterdrain buah 1.000 442,750.00 442,750.00
JUMLAH HARGA BAHAN 902,750.00
C PERALATAN
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 943,550.00


E Overhead & Profit 15.00% 141,532.50
F Harga Satuan Pekerjaan (D+E) 1,085,082.50

A.5.1.1 13. Pemasangan 1 buah bak cuci piring teraso


Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.050 80,000.00 4,000.00
Tukang batu L.02 OH 0.500 110,000.00 55,000.00
Kepala tukang L.03 OH 0.050 120,000.00 6,000.00
Mandor L.04 OH 0.025 120,000.00 3,000.00
JUMLAH TENAGA KERJA 68,000.00
B BAHAN
Bak cuci piring Unit 1.000 201,250.00 201,250.00
Waterdrain buah 1.000 442,750.00 442,750.00
Semen portland Kg 20.000 1,633.00 32,660.00
Pasir pasang M3 0.050 222,812.50 11,140.63
JUMLAH HARGA BAHAN 687,800.63
C PERALATAN
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 755,800.63


E Overhead & Profit 15.00% 113,370.09
F Harga Satuan Pekerjaan (D+E) 869,170.72

A.5.1.1 14. Pemasangan 1 buah floor drain


Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.010 80,000.00 800.00
Tukang batu L.02 OH 0.100 110,000.00 11,000.00
Kepala tukang L.03 OH 0.010 120,000.00 1,200.00
Mandor L.04 OH 0.005 120,000.00 600.00
JUMLAH TENAGA KERJA 13,600.00
B BAHAN
Floor drain Unit 1.000 94,875.00 94,875.00
JUMLAH HARGA BAHAN 94,875.00
C PERALATAN
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 108,475.00


E Overhead & Profit 15.00% 16,271.25
F Harga Satuan Pekerjaan (D+E) 124,746.25

A.5.1.1 15. Pemasangan 1 buah bak kontrol pasangan bata 30x30 tinggi 35 cm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 2.160 80,000.00 172,800.00
Tukang batu L.02 OH 0.720 110,000.00 79,200.00
Kepala tukang L.03 OH 0.072 120,000.00 8,640.00
Mandor L.04 OH 0.011 120,000.00 1,320.00
JUMLAH TENAGA KERJA 261,960.00
B BAHAN
Bata merah buah 40.000 900.00 36,000.00
Semen portland Kg 44.000 1,633.00 71,852.00
Pasir pasang M3 0.070 222,812.50 15,596.88
Pasir beton M3 0.060 244,375.00 14,662.50
Kerikil M3 0.070 230,000.00 16,100.00
Baja tulangan Kg 1.600 20,872.50 33,396.00
JUMLAH HARGA BAHAN 187,607.38
C PERALATAN

JUMLAH HARGA ALAT -

III - 204
D Jumlah (A+B+C) 449,567.38
E Overhead & Profit 15.00% 67,435.11
F Harga Satuan Pekerjaan (D+E) 517,002.48

III - 205
A.5.1.1 16. Pemasangan 1 buah bak kontrol pasangan bata 45cm x 45cm tinggi 50 cm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 3.200 80,000.00 256,000.00
Tukang cat L.02 OH 1.500 110,000.00 165,000.00
Kepala tukang L.03 OH 0.011 120,000.00 1,320.00
Mandor L.04 OH 0.016 120,000.00 1,920.00
JUMLAH TENAGA KERJA 424,240.00
B BAHAN
Bata merah buah 70.000 900.00 63,000.00
Semen portland Kg 77.000 1,633.00 125,741.00
Pasir pasang M3 0.130 222,812.50 28,965.63
Pasir beton M3 0.090 244,375.00 21,993.75
Kerikil M3 0.020 230,000.00 4,600.00
Baja tulangan Kg 2.600 20,872.50 54,268.50
JUMLAH HARGA BAHAN 298,568.88
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 722,808.88


E Overhead & Profit 15.00% 108,421.33
F Harga Satuan Pekerjaan (D+E) 831,230.21

A.5.1.1 17. Pemasangan 1 buah bak kontrol pasangan bata 60 cm x 60 cm tinggi 65 cm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 3.200 80,000.00 256,000.00
Tukang batu L.02 OH 1.150 110,000.00 126,500.00
Kepala tukang L.03 OH 0.011 120,000.00 1,320.00
Mandor L.04 OH 0.016 120,000.00 1,920.00
JUMLAH TENAGA KERJA 385,740.00
B BAHAN
Bata merah buah 123.000 900.00 110,700.00
Semen portland Kg 114.000 1,633.00 186,162.00
Pasir pasang M3 0.184 222,812.50 40,997.50
Pasir beton M3 0.120 244,375.00 29,325.00
Kerikil M3 0.033 230,000.00 7,590.00
Baja tulangan Kg 4.850 20,872.50 101,231.63
JUMLAH HARGA BAHAN 476,006.13
C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 861,746.13
E Overhead & Profit 15.00% 129,261.92
F Harga Satuan Pekerjaan (D+E) 991,008.04

A.5.1.1 18. Pemasangan 1 m’ pipa galvanis diameter ½”

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.054 80,000.00 4,320.00
Tukang batu L.02 OH 0.090 110,000.00 9,900.00
Kepala tukang L.03 OH 0.009 120,000.00 1,080.00
Mandor L.04 OH 0.027 120,000.00 3,240.00
JUMLAH TENAGA KERJA 18,540.00
B BAHAN
Pipa galvanis ½” M 1.200 43,077.20 51,692.64
Perlengkapan Ls 0.350 43,077.20 15,077.02
JUMLAH HARGA BAHAN 66,769.66
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 85,309.66


E Overhead & Profit 15.00% 12,796.45
F Harga Satuan Pekerjaan (D+E) 98,106.11

III - 206
A.5.1.1 19. Pemasangan 1 buah kran diameter ½” atau ¾ ”

Harga Satuan (Rp) Jumlah Harga (Rp)


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0.010 80,000.00 800.00
Tukang batu L.02 OH 0.400 110,000.00 44,000.00
Kepala tukang L.03 OH 0.040 120,000.00 4,800.00
Mandor L.04 OH 0.005 120,000.00 600.00
JUMLAH TENAGA KERJA 50,200.00
B BAHAN
Kran air M 1.000 13,800.00 13,800.00
Sealtape Buah 0.025 4,200.00 105.00
JUMLAH HARGA BAHAN 13,905.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 64,105.00


E Overhead & Profit 15.00% 9,615.75
F Harga Satuan Pekerjaan (D+E) 73,720.75

A.5.1.1 20. Pemasangan 1 m’ pipa galvanis diameter ¾ ”

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.054 80,000.00 4,320.00
Tukang batu L.02 OH 0.090 110,000.00 9,900.00
Kepala tukang L.03 OH 0.009 120,000.00 1,080.00
Mandor L.04 OH 0.027 120,000.00 3,240.00
JUMLAH TENAGA KERJA 18,540.00
B BAHAN
Pipa galvanis 3/4” M 1.200 49,425.00 59,310.00
Perlengkapan % 0.350 20,758.50 20,758.50
JUMLAH HARGA BAHAN 80,068.50
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 98,608.50


E Overhead & Profit 15.00% 14,791.28
F Harga Satuan Pekerjaan (D+E) 113,399.78

A.5.1.1 21. Pemasangan 1 m’ pipa galvanis diameter 1”

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.054 80,000.00 4,320.00
Tukang batu L.02 OH 0.090 110,000.00 9,900.00
Kepala tukang L.03 OH 0.009 120,000.00 1,080.00
Mandor L.04 OH 0.027 120,000.00 3,240.00
JUMLAH TENAGA KERJA 18,540.00
B BAHAN
Pipa galvanis 1” M 1.200 61,258.70 73,510.44
Perlengkapan % 0.350 73,510.44 73,510.44
JUMLAH HARGA BAHAN 147,020.88
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 165,560.88


E Overhead & Profit 15.00% 24,834.13
F Harga Satuan Pekerjaan (D+E) 190,395.01

A.5.1.1 22. Pemasangan 1 m’ pipa galvanis diameter 1 ½”

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.108 80,000.00 8,640.00
Tukang batu L.02 OH 0.180 110,000.00 19,800.00

III - 207
Kepala tukang L.03 OH 0.018 120,000.00 2,160.00
Mandor L.04 OH 0.005 120,000.00 600.00
JUMLAH TENAGA KERJA 31,200.00

III - 208
B BAHAN
Pipa galvanis 11/2” M 1.200 88,015.62 105,618.74
Perlengkapan % 0.350 105,618.74 105,618.74
JUMLAH HARGA BAHAN 211,237.48
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 242,437.48


E Overhead & Profit 15.00% 36,365.62
F Harga Satuan Pekerjaan (D+E) 278,803.10

A.5.1.1 23. Pemasangan 1 m’ pipa galvanis diameter 3”

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.135 80,000.00 10,800.00
Tukang batu L.02 OH 0.225 110,000.00 24,750.00
Kepala tukang L.03 OH 0.023 120,000.00 2,760.00
Mandor L.04 OH 0.007 120,000.00 840.00
JUMLAH TENAGA KERJA 39,150.00
B BAHAN
Pipa galvanis 3” M 1.200 190,395.83 228,475.00
Perlengkapan % 0.350 79,966.25 79,966.25
JUMLAH HARGA BAHAN 308,441.25
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 347,591.25


E Overhead & Profit 15.00% 52,138.69
F Harga Satuan Pekerjaan (D+E) 399,729.94

A.5.1.1 24. Pemasangan 1 m’ pipa galvanis diameter 4”

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.135 80,000.00 10,800.00
Tukang batu L.02 OH 0.225 110,000.00 24,750.00
Kepala tukang L.03 OH 0.023 120,000.00 2,760.00
Mandor L.04 OH 0.007 120,000.00 840.00
JUMLAH TENAGA KERJA 39,150.00
B BAHAN
Pipa galvanis 4” M 1.200 285,011.25 342,013.50
Perlengkapan % 0.350 119,704.73 119,704.73
JUMLAH HARGA BAHAN 461,718.23
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 500,868.23


E Overhead & Profit 15.00% 75,130.23
F Harga Satuan Pekerjaan (D+E) 575,998.46

A.5.1.1 25. Pemasangan 1 m’ pipa PVC tipe AW diameter ½ ”

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.036 80,000.00 2,880.00
Tukang batu L.02 OH 0.060 110,000.00 6,600.00
Kepala tukang L.03 OH 0.006 120,000.00 720.00
Mandor L.04 OH 0.002 120,000.00 240.00
JUMLAH TENAGA KERJA 10,440.00
B BAHAN
Pipa PVC 1/2” M 1.200 5,733.75 6,880.50
Perlengkapan % 0.350 2,408.18 2,408.18
JUMLAH HARGA BAHAN 9,288.68
C PERALATAN

JUMLAH HARGA ALAT -

III - 209
D Jumlah (A+B+C) 19,728.68
E Overhead & Profit 15.00% 2,959.30
F Harga Satuan Pekerjaan (D+E) 22,687.98

III - 210
A.5.1.1 26. Pemasangan 1 m’ pipa PVC tipe AW diameter ¾ ”

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.030 80,000.00 2,400.00
Tukang batu L.02 OH 0.060 110,000.00 6,600.00
Kepala tukang L.03 OH 0.006 120,000.00 720.00
Mandor L.04 OH 0.002 120,000.00 240.00
JUMLAH TENAGA KERJA 9,960.00
B BAHAN
Pipa PVC 3/4” M 1.200 7,903.50 9,484.20
Perlengkapan % 0.350 3,319.47 3,319.47
JUMLAH HARGA BAHAN 12,803.67
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 22,763.67


E Overhead & Profit 15.00% 3,414.55
F Harga Satuan Pekerjaan (D+E) 26,178.22

A.5.1.1 27. Pemasangan 1 m’ pipa PVC tipe AW diameter 1”

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.036 80,000.00 2,880.00
Tukang batu L.02 OH 0.060 110,000.00 6,600.00
Kepala tukang L.03 OH 0.006 120,000.00 720.00
Mandor L.04 OH 0.002 120,000.00 240.00
JUMLAH TENAGA KERJA 10,440.00
B BAHAN
Pipa PVC 1” M 1.200 10,915.09 13,098.11
Perlengkapan % 0.350 4,584.34 4,584.34
JUMLAH HARGA BAHAN 17,682.45
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 28,122.45


E Overhead & Profit 15.00% 4,218.37
F Harga Satuan Pekerjaan (D+E) 32,340.82

A.5.1.1 28. Pemasangan 1 m’ pipa PVC tipe AW diameter 1 ½ ”

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.054 80,000.00 4,320.00
Tukang batu L.02 OH 0.090 110,000.00 9,900.00
Kepala tukang L.03 OH 0.009 120,000.00 1,080.00
Mandor L.04 OH 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 15,660.00
B BAHAN
Pipa PVC 11/2” M 1.200 18,562.50 22,275.00
Perlengkapan % 0.350 7,796.25 7,796.25
JUMLAH HARGA BAHAN 30,071.25
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 45,731.25


E Overhead & Profit 15.00% 6,859.69
F Harga Satuan Pekerjaan (D+E) 52,590.94

A.5.1.1 29. Pemasangan 1 m’ pipa PVC tipe AW diameter 2”

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA

III - 211
Pekerja L.01 OH 0.054 80,000.00 4,320.00
Tukang batu L.02 OH 0.090 110,000.00 9,900.00
Kepala tukang L.03 OH 0.009 120,000.00 1,080.00
Mandor L.04 OH 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 15,660.00

III - 212
B BAHAN
Pipa PVC 2” M 1.200 23,859.06 28,630.88
Perlengkapan % 0.350 10,020.81 10,020.81
JUMLAH HARGA BAHAN 38,651.68
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 54,311.68


E Overhead & Profit 15.00% 8,146.75
F Harga Satuan Pekerjaan (D+E) 62,458.43

A.5.1.1 30. Pemasangan 1 m’ pipa PVC tipe AW diameter 2 ½ ”

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.081 80,000.00 6,480.00
Tukang batu L.02 OH 0.135 110,000.00 14,850.00
Kepala tukang L.03 OH 0.014 120,000.00 1,620.00
Mandor L.04 OH 0.004 120,000.00 480.00
JUMLAH TENAGA KERJA 23,430.00
B BAHAN
Pipa PVC 21/2” M 1.200 34,774.38 41,729.25
Perlengkapan % 0.350 14,605.24 14,605.24
JUMLAH HARGA BAHAN 56,334.49
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 79,764.49


E Overhead & Profit 15.00% 11,964.67
F Harga Satuan Pekerjaan (D+E) 91,729.16

A.5.1.1 31. Pemasangan 1 m’ pipa PVC tipe AW diameter 3”

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.081 80,000.00 6,480.00
Tukang batu L.02 OH 0.135 110,000.00 14,850.00
Kepala tukang L.03 OH 0.014 120,000.00 1,620.00
Mandor L.04 OH 0.004 120,000.00 480.00
JUMLAH TENAGA KERJA 23,430.00
B BAHAN
Pipa PVC 3” M 1.200 48,362.50 58,035.00
Perlengkapan % 0.350 20,312.25 20,312.25
JUMLAH HARGA BAHAN 78,347.25
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 101,777.25


E Overhead & Profit 15.00% 15,266.59
F Harga Satuan Pekerjaan (D+E) 117,043.84

A.5.1.1 32. Pemasangan 1 m’ pipa PVC tipe AW diameter 4”

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.081 80,000.00 6,480.00
Tukang batu L.02 OH 0.135 110,000.00 14,850.00
Kepala tukang L.03 OH 0.014 120,000.00 1,620.00
Mandor L.04 OH 0.004 120,000.00 480.00
JUMLAH TENAGA KERJA 23,430.00
B BAHAN
Pipa PVC 4” M 1.200 79,850.00 95,820.00
Perlengkapan % 0.350 33,537.00 33,537.00
JUMLAH HARGA BAHAN 129,357.00
C PERALATAN

JUMLAH HARGA ALAT -

III - 213
D Jumlah (A+B+C) 152,787.00
E Overhead & Profit 15.00% 22,918.05
F Harga Satuan Pekerjaan (D+E) 175,705.05

III - 214
A.5.1.1 33. Pemasangan 1 m’ pipa air limbah jenis pipa tanah Ǿ 20 cm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.080 80,000.00 6,400.00
Tukang batu L.02 OH 0.040 110,000.00 4,400.00
Kepala tukang L.03 OH 0.004 120,000.00 480.00
Mandor L.04 OH 0.004 120,000.00 480.00
JUMLAH TENAGA KERJA 11,760.00
B BAHAN
Pipa tanah buah 1.600 173,200.00 277,120.00
Semen portlan Kg 35.000 1,633.00 57,155.00
Pasir pasang M3 0.014 222,812.50 3,119.38
Pasir urug M3 0.014 222,755.00 3,118.57
JUMLAH HARGA BAHAN 340,512.95
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 352,272.95


E Overhead & Profit 15.00% 52,840.94
F Harga Satuan Pekerjaan (D+E) 405,113.89

A.5.1.1 34. Pemasangan 1 m’ pipa air limbah jenis pipa tanah diameter 15 cm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.060 80,000.00 4,800.00
Tukang batu L.02 OH 0.030 110,000.00 3,300.00
Kepala tukang L.03 OH 0.003 120,000.00 360.00
Mandor L.04 OH 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 8,820.00
B BAHAN
Pipa tanah dia 15 buah 1.600 113,200.00 181,120.00
Semen portlan Kg 0.680 1,633.00 1,110.44
Pasir pasang M3 0.013 222,812.50 2,896.56
Pasir urug M3 0.011 222,755.00 2,450.31
JUMLAH HARGA BAHAN 187,577.31
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 196,397.31


E Overhead & Profit 15.00% 29,459.60
F Harga Satuan Pekerjaan (D+E) 225,856.90

A.5.1.1 35. Pemasangan 1 m’ pipa beton diameter 15 – 20 cm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.140 80,000.00 11,200.00
Tukang batu L.02 OH 0.070 110,000.00 7,700.00
Kepala tukang L.03 OH 0.007 120,000.00 840.00
Mandor L.04 OH 7.000 120,000.00 840,000.00
JUMLAH TENAGA KERJA 859,740.00
B BAHAN
Pipa beton dia. 15-20 buah 1.100 44,300.00 48,730.00
Bata merah M3 0.027 900.00 24.30
Semen portlan Kg 3.920 1,633.00 6,401.36
Pasir pasang M3 0.056 222,812.50 12,477.50
Pasir urug M3 0.024 222,755.00 5,346.12
JUMLAH HARGA BAHAN 72,979.28
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 932,719.28


E Overhead & Profit 15.00% 139,907.89
F Harga Satuan Pekerjaan (D+E) 1,072,627.17

III - 215
A.5.1.1.36. Pemasangan 1 m’ pipa beton diameter 30 – 100 cm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.380 80,000.00 30,400.00
Tukang batu L.02 OH 0.190 110,000.00 20,900.00
Kepala tukang L.03 OH 0.019 120,000.00 2,280.00
Mandor L.04 OH 0.019 120,000.00 2,280.00
JUMLAH TENAGA KERJA 55,860.00
B BAHAN
Pipa beton dia. 30-100 buah 1.100 66,000.00 72,600.00
Bata merah M3 0.550 900.00 495.00
Semen portlan Kg 10.300 1,633.00 16,819.90
Pasir pasang M3 0.061 222,812.50 13,591.56
Pasir urug M3 0.069 222,755.00 15,370.10
JUMLAH HARGA BAHAN 118,876.56
C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 174,736.56
E Overhead & Profit 15.00% 26,210.48
F Harga Satuan Pekerjaan (D+E) 200,947.04

A.8.4.6 HARGA SATUAN PEKERJAAN ELEKTRIKAL


A.8.4.6.1 (K3) Pemasangan 1 buah titik lampu (Instalasi)

Harga Satuan (Rp) Jumlah Harga (Rp)


No Uraian Kode Satuan Koefisien
A TENAGA
Upah % 1.000 2,769,775.00 2,769,775.00
JUMLAH TENAGA KERJA 2,769,775.00
B BAHAN
Pipa listrik 5/8” btg 3.000 5,750.00 17,250.00
Kabel m 24.000 9,200.00 220,800.00
T Dus buah 3.000 2,300.00 6,900.00
L Bow buah 4.000 2,300.00 9,200.00
Las Dop buah 3.000 3,450.00 10,350.00
Klem buah 24.000 103,500.00 2,484,000.00
Mongkok buah 1.000 1,150.00 1,150.00
Saklar buah 1.000 14,950.00 14,950.00
Fitting buah 1.000 5,175.00 5,175.00
JUMLAH HARGA BAHAN 2,769,775.00
C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 5,539,550.00
E Overhead & Profit 15.00% 830,932.50
F Harga Satuan Pekerjaan (D+E) 6,370,482.50

A.8.4.6.1 (K3) Pemasangan 1 buah MCB (Penyambungan Daya ke PLN)

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Upah % 1.000 2,680,650.00 2,680,650.00
JUMLAH TENAGA KERJA 2,680,650.00
B BAHAN
Pipa listrik 5/8” btg 3.000 5,750.00 17,250.00
Kabel m 15.000 9,200.00 138,000.00
T Dus buah 1.000 2,300.00 2,300.00
L Bow buah 2.000 2,300.00 4,600.00
Klem biasa buah 24.000 103,500.00 2,484,000.00
MCB buah 1.000 34,500.00 34,500.00
JUMLAH HARGA BAHAN 2,680,650.00
C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 5,361,300.00
E Overhead & Profit 15.00% 804,195.00
F Harga Satuan Pekerjaan (D+E) 6,165,495.00

III - 216
TAMBAHAN / LAIN-LAIN

- 1 Buah Pembuatan Papan Nama Proyek

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pembantu tukang oh 0.200 80,000.00 16,000.00
Tukang kayu oh 0.600 110,000.00 66,000.00
Kepala tukang oh 0.060 120,000.00 7,200.00
Mandor oh 0.020 120,000.00 2,400.00
JUMLAH TENAGA KERJA 91,600.00

B BAHAN
Kayu Kaso 5/7 (kayu hutan) m3 0.020 4,025,000.00 80,500.00
Paku Biasa 2-5 kg 0.250 23,000.00 5,750.00
Kayu Dolken dia.8 8-10/4 m' btg 1.500 74,750.00 112,125.00
Triplek 6 mm lbr 0.350 146,050.00 51,117.50
Cetak papan nama dg bhn flexi cetak digital print m' 1.000 28,750.00 28,750.00
JUMLAH HARGA BAHAN 278,242.50
C PERALATAN -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 369,842.50


E Overhead & Profit 15.00% 55,476.38
F Harga Satuan Pekerjaan (D+E) 425,318.88

SNI 7395:2008 N0.6.9 Memasang 1 m2 lantai ubin granit ukuran 40 x 40

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pembantu tukang oh 0.250 80,000.00 20,000.00
Tukang batu oh 0.125 110,000.00 13,750.00
Kepala tukang oh 0.013 120,000.00 1,560.00
Mandor oh 0.013 120,000.00 1,560.00
JUMLAH TENAGA KERJA 36,870.00
B BAHAN
ubin granit bh 0.020 64,630.00 1,292.60
portland cement kg 0.250 1,633.00 408.25
pasir pasang m3 1.500 222,812.50 334,218.75
semen warna kg 0.350 6,900.00 2,415.00
JUMLAH HARGA BAHAN 338,334.60
C PERALATAN -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 375,204.60


E Overhead & Profit 15.00% 56,280.69
F Harga Satuan Pekerjaan (D+E) 431,485.29

SNI 03-7395:2008 N0.6.9 Memasang 1 m2 lantai keramik ukuran 40 x 40

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pembantu tukang oh 0.250 80,000.00 20,000.00
Tukang batu oh 0.120 110,000.00 13,200.00
Kepala tukang oh 0.012 120,000.00 1,440.00
Mandor oh 0.013 120,000.00 1,560.00
JUMLAH TENAGA KERJA 36,200.00
B BAHAN
keramik 40 x 40 bh 6.630 12,650.00 83,869.50
portland cement kg 9.800 1,633.00 16,003.40
pasir pasang m3 0.045 222,812.50 10,026.56
semen warna kg 1.300 6,900.00 8,970.00
JUMLAH HARGA BAHAN 118,869.46
C PERALATAN -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 155,069.46


E Overhead & Profit 15.00% 23,260.42
F Harga Satuan Pekerjaan (D+E) 178,329.88

III - 217
SNI 03-7395:2008 N0.6.9 Memasang 1 m2 lantai granit ukuran 60 x 60

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pembantu tukang oh 0.375 80,000.00 30,000.00
Tukang batu oh 0.180 110,000.00 19,800.00
Kepala tukang oh 0.018 120,000.00 2,160.00
Mandor oh 0.020 120,000.00 2,340.00
JUMLAH TENAGA KERJA 54,300.00
B BAHAN
granito 60 x 60 bh 3.000 66,585.00 199,755.00
portland cement kg 14.700 1,633.00 24,005.10
pasir pasang m3 0.068 222,812.50 15,039.84
semen warna kg 1.950 6,900.00 13,455.00
JUMLAH HARGA BAHAN 252,254.94
C PERALATAN -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 306,554.94


E Overhead & Profit 15.00% 45,983.24
F Harga Satuan Pekerjaan (D+E) 352,538.19

SNI 2839:2008 N0.6.8 Memasang 1 m' List Plafond Gypsum Profil

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pembantu tukang oh 0.060 80,000.00 4,800.00
Tukang batu oh 0.060 110,000.00 6,600.00
Kepala tukang oh 0.006 120,000.00 720.00
Mandor oh 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 12,480.00
B BAHAN
List gypsum profil m' 1.050 20,700.00 21,735.00
Tepung gypsum kg 0.150 21,275.00 3,191.25

JUMLAH HARGA BAHAN 24,926.25


C PERALATAN -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 37,406.25


E Overhead & Profit 15.00% 5,610.94
F Harga Satuan Pekerjaan (D+E) 43,017.19

SNI 2839:2008 N0.6.8 1 m' Pasang Listplank Woodplank

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pembantu tukang oh 0.100 80,000.00 8,000.00
Tukang batu oh 0.200 110,000.00 22,000.00
Kepala tukang oh 0.020 120,000.00 2,400.00
Mandor oh 0.005 120,000.00 600.00
JUMLAH TENAGA KERJA 33,000.00
B BAHAN
woodplank bh 0.250 69,000.00 17,250.00
Paku biasa 2" - 5" kg 0.050 23,000.00 1,150.00

JUMLAH HARGA BAHAN 18,400.00


C PERALATAN -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 51,400.00


E Overhead & Profit 15.00% 7,710.00
F Harga Satuan Pekerjaan (D+E) 59,110.00

ABK.990.07 Menurunkan 1 m2 atap genteng

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga

III - 218
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.200 80,000.00 16,000.00
Mandor L.15 OH 0.100 120,000.00 12,000.00
JUMLAH TENAGA KERJA 28,000.00

III - 219
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 28,000.00


E Overhead & Profit 15.00% 4,200.00
JUMLAH 32,200.00
F Harga Satuan Pekerjaan (D+E) Untuk 1 m2, maka : Upah diambil : 2/3 X Rp 3,220.00 2,146.67

ABK.990.09 Menurunkan 1 m2 rangka atap/Plafond

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.000 80,000.00 80,000.00
Mandor L.04 OH 0.050 120,000.00 6,000.00
JUMLAH TENAGA KERJA 86,000.00
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 86,000.00


E Overhead & Profit 15.00% 12,900.00
JUMLAH 98,900.00
F Harga Satuan Pekerjaan (D+E) Untuk 1 m2, maka : Upah diambil : 2/3 X Rp 9,890.00 6,593.33

ABK.990.12 Menurunkan 1 m3 kayu rangka kuda-kuda

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 4.00 80,000.00 320,000.00
Tukang kayu L.02 OH 6.00 110,000.00 660,000.00
Kepala tukang L.03 OH 0.60 120,000.00 72,000.00
Mandor L.04 OH 0.20 120,000.00 24,000.00
JUMLAH TENAGA KERJA 1,076,000.00
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 1,076,000.00


E Overhead & Profit 15.00% 161,400.00
JUMLAH 1,237,400.00
F Harga Satuan Pekerjaan (D+E) Untuk 1 m2, maka : Upah diambil : 2/3 X Rp 123,740.00 82,493.33

ABK.990.05 Membongkar 1 m2 lantai tegel/floor

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.00 80,000.00 80,000.00
Mandor L.04 OH 0.10 120,000.00 12,000.00
JUMLAH TENAGA KERJA 92,000.00
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 92,000.00


E Overhead & Profit 15.00% 13,800.00

III - 220
JUMLAH 105,800.00
F Harga Satuan Pekerjaan (D+E) Untuk 1 m2, maka : Upah diambil : 2/3 X Rp 10,580.00 7,053.33

III - 221
SNI 2012 1 m³ Bongkaran Beton Bertulang

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 6.667 80,000.00 533,360.00
Mandor L.04 OH 0.333 120,000.00 39,960.00
JUMLAH TENAGA KERJA 573,320.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 573,320.00


E Overhead & Profit 15.00% 85,998.00
F Harga Satuan Pekerjaan (D+E) 659,318.00

SNI 2012 1 m³ Bongkaran Dinding Tembok Bata Merah

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 6.667 80,000.00 533,360.00
Mandor L.04 OH 0.033 120,000.00 3,960.00
JUMLAH TENAGA KERJA 537,320.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 537,320.00


E Overhead & Profit 15.00% 80,598.00
F Harga Satuan Pekerjaan (D+E) 617,918.00

ABK.300.19 1 m3 Pekerjaan Beton AD. 1:2:3

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A BAHAN
Semen portland kg 232 1,633.00 378,856.00
Pasir beton m3 0.52 244,375.00 127,075.00
Spleet 2/3 cm m3 0.78 345,000.00 269,100.00
JUMLAH HARGA BAHAN 775,031.00
B TENAGA
Pekerja Oh 1.65 80,000.00 132,000.00
Tukang batu Oh 0.25 110,000.00 27,500.00
Kepala tukang Oh 0.025 120,000.00 3,000.00
Mandor Oh 0.08 120,000.00 9,600.00
JUMLAH TENAGA KERJA 172,100.00
C PERALATAN
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 947,131.00


E Overhead & Profit 15.00% 142,069.65
F Harga Satuan Pekerjaan (D+E) 1,089,200.65

- 1m2 Pasang Plafond Rangka Holo dan Dengan Penutup GRC Berikut Pengecatan

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A BAHAN
GRC 4 mm lbr 0.35 78,200.00 27,370.00
Holo 4/4 meni btg 1.00 13,915.00 13,915.00
Holo 2/4 meni btg 0.34 12,650.00 4,301.00
Kawat Bwg 12 kg 0.10 11,500.00 1,150.00
Paku screw 2.5 cm bh 20.00 57.50 1,150.00
Adhesive kg 0.02 6,900.00 138.00
Kain kasa m' 2.00 460.00 920.00
Cat penutup 2 kali kg 0.03 28,750.00 862.50
Paku beton bh 4.00 201.25 805.00
JUMLAH HARGA BAHAN 50,611.50

III - 222
B TENAGA
Pekerja oh 0.17 80,000.00 13,600.00
Tukang oh 0.28 110,000.00 30,800.00
Kep Tukang oh 0.03 120,000.00 3,600.00
Mandor oh 0.07 120,000.00 8,400.00
JUMLAH TENAGA KERJA 56,400.00
C PERALATAN
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 107,011.50


E Overhead & Profit 15.00% 16,051.73
F Harga Satuan Pekerjaan (D+E) 123,063.23

- 1 Titik Pekerjaan Instalasi Lampu dan Stop Kontak

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A BAHAN
Kabel Listrik NYA 3 x 2,5 mm m' 11.00 7,475.00 82,225.00
Instalasi lapu dan stop kontak ttk 1.00 37,375.00 37,375.00
JUMLAH HARGA BAHAN 119,600.00
B TENAGA
Pembantu tukang Listrik Oh 0.48 80,000.00 38,400.00
Tukang Listrik Oh 0.048 110,000.00 5,280.00
Kepala tukang Listrik Oh 0.048 120,000.00 5,760.00
JUMLAH TENAGA KERJA 49,440.00
C PERALATAN
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 169,040.00


E Overhead & Profit 15.00% 25,356.00
F Harga Satuan Pekerjaan (D+E) 194,396.00

- 1 Bh Pekerjaan Stop Kontak

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
BAHAN
Stop Kontak bh 1.000 14,950.00 14,950.00
JUMLAH HARGA BAHAN 14,950.00
TENAGA
Pembantu tukang Listrik Oh 0.2 80,000.00 16,000.00
Tukang Listrik Oh 0.02 110,000.00 2,200.00
Kepala tukang Listrik Oh 0.02 120,000.00 2,400.00
JUMLAH TENAGA KERJA 20,600.00
C PERALATAN
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 35,550.00


E Overhead & Profit 15.00% 5,332.50
F Harga Satuan Pekerjaan (D+E) 40,882.50

- 1 Bh Pekerjaan Lampu SL 18 Watt + Fitting

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
BAHAN
Lampu SL 18 watt + fitting bh 1.000 41,400.00 41,400.00
JUMLAH HARGA BAHAN 41,400.00
TENAGA
Pembantu tukang Listrik Oh 0.2 80,000.00 16,000.00
Tukang Listrik Oh 0.02 110,000.00 2,200.00
Kepala tukang Listrik 0 0.02 120,000.00 2,400.00
JUMLAH TENAGA KERJA 20,600.00
C PERALATAN
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 62,000.00


E Overhead & Profit 15.00% 9,300.00
F Harga Satuan Pekerjaan (D+E) 71,300.00

III - 223
- 1 Unit Pekerjaan Sekring Kast

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
BAHAN
Sekring Kast bh 1.000 46,000.00 46,000.00
JUMLAH HARGA BAHAN 46,000.00
TENAGA
Pembantu tukang Listrik Oh 0.2 80,000.00 16,000.00
Tukang Listrik Oh 0.02 110,000.00 2,200.00
Kepala tukang Listrik Oh 0.02 120,000.00 2,400.00
JUMLAH TENAGA KERJA 20,600.00
C PERALATAN
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 66,600.00


E Overhead & Profit 15.00% 9,990.00
F Harga Satuan Pekerjaan (D+E) 76,590.00

- 1 Bh Pekerjaan MCB Box

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
BAHAN
MCB BOX bh 1.000 34,500.00 34,500.00
JUMLAH HARGA BAHAN 34,500.00
TENAGA
Pembantu tukang Listrik Oh 0.2 80,000.00 16,000.00
Tukang Listrik Oh 0.02 110,000.00 2,200.00
Kepala tukang Listrik Oh 0.02 120,000.00 2,400.00
JUMLAH TENAGA KERJA 20,600.00
C PERALATAN
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 55,100.00


E Overhead & Profit 15.00% 8,265.00
F Harga Satuan Pekerjaan (D+E) 63,365.00

- 1 m' Pekerjaan Over Spaneng

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
BAHAN
Over Spaneng m' 1.000 10,350.00 10,350.00
JUMLAH HARGA BAHAN 10,350.00
TENAGA
Pembantu tukang Listrik Oh 0.24 80,000.00 19,200.00
Tukang Listrik Oh 0.024 110,000.00 2,640.00
Kepala tukang Listrik Oh 0.024 120,000.00 2,880.00
JUMLAH TENAGA KERJA 24,720.00
C PERALATAN
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 35,070.00


E Overhead & Profit 15.00% 5,260.50
F Harga Satuan Pekerjaan (D+E) 40,330.50

- 1 Bh Pekerjaan Saklar Ganda

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
BAHAN
Saklar Ganda bh 1.000 18,400.00 18,400.00
JUMLAH HARGA BAHAN 18,400.00
TENAGA
Pembantu tukang Listrik Oh 0.4 80,000.00 32,000.00
Tukang Listrik Oh 0.04 110,000.00 4,400.00
Kepala tukang Listrik Oh 0.04 120,000.00 4,800.00
JUMLAH TENAGA KERJA 41,200.00
C PERALATAN
JUMLAH HARGA ALAT -

III - 224
D Jumlah (A+B+C) 59,600.00
E Overhead & Profit 15.00% 8,940.00
F Harga Satuan Pekerjaan (D+E) 68,540.00

III - 225
- 1 Bh Pekerjaan Saklar Tunggal

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
BAHAN
Saklar tunggal bh 1.000 14,950.00 14,950.00
JUMLAH HARGA BAHAN 14,950.00
TENAGA
Pembantu tukang Listrik Oh 0.4 80,000.00 32,000.00
Tukang Listrik Oh 0.04 110,000.00 4,400.00
Kepala tukang Listrik Oh 0.04 120,000.00 4,800.00
JUMLAH TENAGA KERJA 41,200.00
C PERALATAN
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 56,150.00


E Overhead & Profit 15.00% 8,422.50
F Harga Satuan Pekerjaan (D+E) 64,572.50

A.3.2.1.2.a Pemasangan pasangan 1 m3 batu belah campuran 1SP : 4PP

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.500 80,000.00 120,000.00
Tukang batu L.02 OH 0.750 110,000.00 82,500.00
Kepala tukang L.03 OH 0.075 120,000.00 9,000.00
Mandor L.04 OH 0.075 120,000.00 9,000.00
JUMLAH TENAGA KERJA 220,500.00
B BAHAN
Batu belah m3 1.200 345,000.00 414,000.00
Semen Portland Kg 163.000 1,633.00 266,179.00
Pasir pasang m3 0.520 222,812.50 115,862.50
JUMLAH HARGA BAHAN 796,041.50
C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 1,016,541.50
E Overhead & Profit 15.00% 152,481.23
F Harga Satuan Pekerjaan (D+E) 1,169,022.73

Sumber, 2020

Kepala Dinas Perumahan, Kawasan Permukiman Dan Pertanahan


Kabupaten Cirebon

H. SUKMA NUGRAHA, SH.,MM.


NIP. 19610301 198603 1 012

III - 226
Analisa EI-311a

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : 3.1.(1a)


JENIS PEKERJAAN : Galian Biasa / Kupasan (menggunakan alat berat)
SATUAN PEMBAYARAN : M3

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 0.0511 11,428.57 584.01


2. Mandor (L03) Jam 0.0256 17,142.86 438.00

JUMLAH HARGA TENAGA 1,022.01

B. BAHAN

JUMLAH HARGA BAHAN 0.00

C. PERALATAN

1. Excavator (E10) Jam 0.0256 432,395.76 11,047.81


2. Dump Truck (E08) Jam 0.3344 261,574.70 87,459.68
3. Alat Bantu Ls 1.0000 0.00 0.00

JUMLAH HARGA PERALATAN 98,507.49

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 99,529.50


E. OVERHEAD & PROFIT 15.0 % x D 14,929.43
F. HARGA SATUAN PEKERJAAN ( D + E ) 114,458.93
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.

IV - 227
Analisa EI-321.rob

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : 3.2.(1).rob


JENIS PEKERJAAN : Timbunan Biasa
SATUAN PEMBAYARAN : M3

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 0.0403 11,428.57 460.62


2. Mandor (L02) Jam 0.0101 17,142.86 172.73

JUMLAH HARGA TENAGA 633.36

B. BAHAN

1. Bahan timbunan (M08) M3 1.1100 143,750.00 159,562.50

JUMLAH HARGA BAHAN 159,562.50

C. PERALATAN
1. Excavator (E10) Jam 0.0101 432,395.76 4,356.88
2. Dump Truck (E08) Jam 0.6103 261,574.70 159,650.42
3. Motor Grader (E13) Jam 0.0037 0.00 0.00
4 Vibro Roller (E19) Jam 0.0042 282,396.73 1,181.38
5. Water tank truck (E23) Jam 0.0070 362,404.86 2,547.02
6 Alat Bantu Ls 1.0000 0.00 0.00

JUMLAH HARGA PERALATAN 167,735.70

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 327,931.56


E. OVERHEAD & PROFIT 15.0 % x D 49,189.73
F. HARGA SATUAN PEKERJAAN ( D + E ) 377,121.30
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.

IV - 228
Analisa EI-322.rob

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : 3.2.(2).rob


JENIS PEKERJAAN : Timbunan Pilihan
SATUAN PEMBAYARAN : M3

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 2.4294 11,428.57 27,764.38


2. Mandor (L03) Jam 0.6073 17,142.86 10,411.64

JUMLAH HARGA TENAGA 38,176.03

B. BAHAN

1. Bahan pilihan (M09) (M09) M3 1.1100 172,500.00 191,475.00

JUMLAH HARGA BAHAN 191,475.00

C. PERALATAN
1. Wheel Loader (E15) Jam 0.0085 477,782.58 4,063.35
2. Dump Truck (E08) Jam 0.6073 261,574.70 158,866.31
3. Motor Grader (E13) Jam 0.0040 0.00 0.00
3. Tandem (E17) Jam 0.0161 445,867.99 7,180.49
4. Water Tanker (E23) Jam 0.0070 362,404.86 2,547.02
5. Alat Bantu Ls 1.0000 0.00 0.00

JUMLAH HARGA PERALATAN 172,657.18

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 402,308.20


E. OVERHEAD & PROFIT 15.0 % x D 60,346.23
F. HARGA SATUAN PEKERJAAN ( D + E ) 462,654.43
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.

IV - 229
Analisa EI-331.rob

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : 3.3.(1).rob


JENIS PEKERJAAN : Penyiapan Badan Jalan
SATUAN PEMBAYARAN : M2

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) jam 0.0024 11,428.57 27.21


2. Mandor (L02) jam 0.0006 17,142.86 10.20

JUMLAH HARGA TENAGA 37.41

B. BAHAN

JUMLAH HARGA BAHAN 0.00

C. PERALATAN
1. Motor Grader (E13) jam 0.0006 0.00 0.00
2. Vibro Roller (E19) jam 0.0005 282,396.73 132.91
3 Alat Bantu Ls 1.0000 0.00 0.00

JUMLAH HARGA PERALATAN 132.91

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 170.32


E. OVERHEAD & PROFIT 15.0 % x D 25.55
F. HARGA SATUAN PEKERJAAN ( D + E ) 195.87
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.

IV - 230
Analisa EI-611a

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : 6.1 (1)(a)


JENIS PEKERJAAN : Lapis Resap Pengikat - Aspal Cair
SATUAN PEMBAYARAN : Liter

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 0.0021 11,428.57 23.81


2. Mandor (L03) Jam 0.0004 17,142.86 7.14

JUMLAH HARGA TENAGA 30.95

B. BAHAN

1. Aspal (M10) Kg 0.6790 14,030.00 9,526.03


2. Kerosene (M11) liter 0.3708 11,758.75 4,360.14

JUMLAH HARGA BAHAN 13,886.18

C. PERALATAN

1. Asp. Distributor E41 Jam 0.0002 418,424.11 87.17


2. Compressor E05 Jam 0.0002 168,688.05 35.14

JUMLAH HARGA PERALATAN 122.32

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 14,039.45


E. OVERHEAD & PROFIT 15.0 % x D 2,105.92
F. HARGA SATUAN PEKERJAAN ( D + E ) 16,145.36
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.

IV - 231
Analisa EI-612a

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : 6.1 (2)(a)


JENIS PEKERJAAN : Lapis Perekat - Aspal Cair
SATUAN PEMBAYARAN : Liter

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 0.0021 11,428.57 23.81


2. Mandor (L03) Jam 0.0004 17,142.86 7.14

JUMLAH HARGA TENAGA 30.95

B. BAHAN

1. Aspal (M10) Kg 0.8487 14,030.00 11,907.54


2. Kerosene (M11) liter 0.2060 11,758.75 2,422.30

JUMLAH HARGA BAHAN 14,329.84

C. PERALATAN

1. Asp. Distributor E41 Jam 0.0002 418,424.11 87.17


2. Compressor E05 Jam 0.0002 168,688.05 35.14

JUMLAH HARGA PERALATAN 122.32

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 14,483.11


E. OVERHEAD & PROFIT 15.0 % x D 2,172.47
F. HARGA SATUAN PEKERJAAN ( D + E ) 16,655.58
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.

IV - 232
Analisa EI-621

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : 6.2 (1)


JENIS PEKERJAAN : Agregat Penutup BURTU
SATUAN PEMBAYARAN : M2

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 0.2126 11,428.57 2,429.89


2. Mandor (L02) Jam 0.0106 17,142.86 182.24

JUMLAH HARGA TENAGA 2,612.13

B. BAHAN

1. Chipping (M41) Kg 23.0000 149.49 3,438.16

JUMLAH HARGA BAHAN 3,438.16

C. PERALATAN

1. Wheel Loader E15 Jam 0.0106 477,782.58 5,079.19


2. Dump Truck E08 Jam 0.0214 261,574.70 5,589.69
3. P. Tyre Roller E18 Jam 0.0005 489,172.15 263.40
4. Alat Bantu Ls 1.0000 0.00 0.00

JUMLAH HARGA PERALATAN 10,932.29

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 16,982.58


E. OVERHEAD & PROFIT 15.0 % x D 2,547.39
F. HARGA SATUAN PEKERJAAN ( D + E ) 19,529.97
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.

IV - 233
Analisa EI-631.rob

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : 6.3 (1).rob


JENIS PEKERJAAN : Latasir Kelas A (SS-A)
SATUAN PEMBAYARAN : Ton, m2

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 0.1406 11,428.57 1,606.43


2. Mandor (L03) Jam 0.0201 17,142.86 344.23

JUMLAH HARGA TENAGA 1,950.66

B. BAHAN

1. Pasir Kasar M01a M3 0.2086 244,375.00 50,967.25


2. Pasir Halus M01c M3 0.4171 222,755.00 92,916.30
3 Semen/Filler (M05) Kg 31.5000 460.00 14,490.00
4 Aspal (M10) Kg 103.0000 14,030.00 1,445,090.00

JUMLAH HARGA BAHAN 1,603,463.55

C. PERALATAN
1. Wheel Loader E15 Jam 0.0096 477,782.58 4,573.04
2. AMP E01 Jam 0.0201 9,343,417.71 187,618.83
3. Genset E12 Jam 0.0201 353,061.25 7,089.58
4. Dump Truck (3,5 ton) E08 Jam 0.0122 261,574.70 3,192.03
5. Asphalt Finisher E02 Jam 0.0386 - 0.00
6. Tandem Roller E17 Jam 0.0317 445,867.99 14,146.25
7 P. Tyre Roller E18 Jam 0.0109 - 0.00
8 Alat Bantu Ls 1.0000 0.00 0.00

JUMLAH HARGA PERALATAN 216,619.73

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 1,822,033.94


E. OVERHEAD & PROFIT 15.0 % x D 273,305.09
F. HARGA SATUAN PEKERJAAN ( D + E ) 2,095,339.03
MAKA HARGA UNTUK 1 M2 69,844.63
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.

IV - 234
Analisa EI-632.rob

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : 6.3 (2).rob


JENIS PEKERJAAN : Latasir Kelas B (SS-B)
SATUAN PEMBAYARAN : Ton, m2

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 0.1406 11,428.57 1,606.43


2. Mandor (L03) Jam 0.0201 17,142.86 344.23

JUMLAH HARGA TENAGA 1,950.66

B. BAHAN

1. Pasir Kasar (M01a) M3 0.0139 244,375.00 3,402.50


2. Pasir Halus (M01c) M3 0.0139 222,755.00 3,101.48
3 Semen (M05) 31.5000 460.00 14,490.00
4 Aspal (M10) 92.7000 14,030.00 1,300,581.00

JUMLAH HARGA BAHAN 1,321,574.99

C. PERALATAN
1. Wheel Loader E15 Jam 0.0096 477,782.58 4,573.04
2. AMP E01 Jam 0.0201 9,343,417.71 187,618.83
3. Genset E12 Jam 0.0201 353,061.25 7,089.58
4. Dump Truck E08 Jam 0.0163 261,574.70 4,256.04
5. Asphalt Finisher E02 Jam 0.0290 - 0.00
6. Tandem Roller E17 Jam 0.0238 445,867.99 10,609.69
7 P. Tyre Roller E18 Jam 0.0082 - 0.00
8 Alat Bantu Ls 1.0000 0.00 0.00

JUMLAH HARGA PERALATAN 214,147.18

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 1,537,672.82


E. OVERHEAD & PROFIT 15.0 % x D 230,650.92
F. HARGA SATUAN PEKERJAAN ( D + E ) 1,768,323.75
MAKA HARGA UNTUK 1 M2 78,592.17
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.

IV - 235
Analisa EI-661

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : 6.6.(1)


JENIS PEKERJAAN : Lapis Permukaan Penetrasi Macadam
SATUAN PEMBAYARAN : M3

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 0.1417 11,428.57 1,619.93


2. Mandor (L03) Jam 0.0142 17,142.86 242.99

JUMLAH HARGA TENAGA 1,862.91

B. BAHAN

1. Agregat Kasar (M03) M3 1.6690 345,000.00 575,809.86


2. Agregat Halus (M04) M3 0.1479 345,000.00 51,021.13
3 Aspal (M10) Kg 98.5857 14,030.00 1,383,157.57

JUMLAH HARGA BAHAN 2,009,988.56

C. PERALATAN

1. Wheel Loader E15 Jam 0.0071 477,782.58 3,386.13


2. Dump Truck E09 Jam 0.1823 402,962.24 73,456.49
3. 3-Wheel Roller E16 Jam 0.0435 252,193.22 10,965.92
4. Asp. Sprayer E03 Jam 0.3788 142,633.79 54,027.95
5. Alat bantu Ls 1.0000 0.00 0.00

JUMLAH HARGA PERALATAN 141,836.49

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 2,153,687.96


E. OVERHEAD & PROFIT 15.0 % x D 323,053.19
F. HARGA SATUAN PEKERJAAN ( D + E ) 2,476,741.15
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.

IV - 236
Analisa EI-662

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : 6.6.(2)


JENIS PEKERJAAN : Lapis Pondasi/Perata Penetrasi Macadam
SATUAN PEMBAYARAN : M3

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 0.1417 11,428.57 1,619.93


2. Mandor (L03) Jam 0.0142 17,142.86 242.99

JUMLAH HARGA TENAGA 1,862.91

B. BAHAN

1. Agregat Kasar (M03) M3 1.7746 345,000.00 612,253.52


2. Agregat Halus (M04) M3 0.2465 345,000.00 85,035.21
3 Aspal (M10) Kg 103.0000 14,030.00 1,445,090.00

JUMLAH HARGA BAHAN 2,142,378.73

C. PERALATAN

1. Wheel Loader E15 Jam 0.0071 477,782.58 3,386.13


2. Dump Truck E09 Jam 0.1823 402,962.24 73,456.49
3. 3-Wheel Roller E16 Jam 0.0406 252,193.22 10,234.85
4. Asp. Sprayer E03 Jam 0.3788 142,633.79 54,027.95
5. Alat bantu Ls 1.0000 0.00 0.00

JUMLAH HARGA PERALATAN 141,105.43

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 2,285,347.07


E. OVERHEAD & PROFIT 15.0 % x D 342,802.06
F. HARGA SATUAN PEKERJAAN ( D + E ) 2,628,149.13
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.

IV - 237
Analisa EI-814

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : 8.1 (4)


JENIS PEKERJAAN : Waterbound Macadam Utk. Pek. Minor
SATUAN PEMBAYARAN : M3

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja Biasa (L01) Jam 0.1631 11,428.57 1,864.09


2. Mandor (L03) Jam 0.0102 17,142.86 174.76

JUMLAH HARGA TENAGA 2,038.85

B. BAHAN

1. Agregat Kasar M3 0.9350 345,000.00 322,575.00


2. Agregat Halus M3 0.1650 345,000.00 56,925.00

JUMLAH HARGA BAHAN 379,500.00

C. PERALATAN

1. Wheel Loader E15 Jam 0.0102 477,782.58 4,870.64


2. Dump Truck E09 Jam 0.0897 402,962.24 36,148.51
3. 3-Wheel Roller E16 Jam 0.0268 252,193.22 6,752.16
4. Alat Bantu Ls 1.0000 0.00 0.00

JUMLAH HARGA PERALATAN 47,771.31

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 429,310.17


E. OVERHEAD & PROFIT 15.0 % x D 64,396.52
F. HARGA SATUAN PEKERJAAN ( D + E ) 493,706.69
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.

IV - 238
Analisa EI-817

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : 8.1 (7)


JENIS PEKERJAAN : Penetrasi Macadam Utk.Pek.Minor (Perata)
SATUAN PEMBAYARAN : M3

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja Biasa (L01) Jam 0.1701 11,428.57 1,943.91


2. Mandor (L03) Jam 0.0170 17,142.86 291.59

JUMLAH HARGA TENAGA 2,235.50

B. BAHAN

1. Agregat Kasar M3 1.7556 345,000.00 605,666.67


2. Agregat Halus M3 0.0000 345,000.00 0.00
3 Aspal (M10) Kg 99.2727 14,030.00 1,392,796.36

JUMLAH HARGA BAHAN 1,998,463.03

C. PERALATAN

1. Wheel Loader E15 Jam 0.0085 477,782.58 4,063.35


2. Dump Truck E09 Jam 0.2081 402,962.24 83,871.79
3. 3-Wheel Roller E16 Jam 0.0118 252,193.22 2,970.16
4. Asp. Sprayer E03 Jam 0.0359 142,633.79 5,118.46
5. Alat bantu Ls 1.0000 0.00 0.00

JUMLAH HARGA PERALATAN 96,023.75

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 2,096,722.28


E. OVERHEAD & PROFIT 15.0 % x D 314,508.34
F. HARGA SATUAN PEKERJAAN ( D + E ) 2,411,230.62
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.

IV - 239
Analisa EI-412

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : 4.1 (2)


JENIS PEKERJAAN : Lapis Pondasi Agregat Kelas A (Buruh)
SATUAN PEMBAYARAN : M3

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja Biasa (L01) Jam 0.5000 11,428.57 5,714.29


2. Mandor (L03) Jam 0.0167 17,142.86 286.29

JUMLAH HARGA TENAGA 6,000.57

B. BAHAN

1. Bahan Agg. Kelas A M26 M3 1.1864 395,945.00 469,749.15

JUMLAH HARGA BAHAN 469,749.15

C. PERALATAN

1. Tandem Roller E17 Jam 0.0357 445,867.99 15,917.49


2. Water Tanker E23 Jam 0.0141 362,404.86 5,109.91

JUMLAH HARGA PERALATAN 21,027.40

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 496,777.12


E. OVERHEAD & PROFIT 15.0 % x D 74,516.57
F. HARGA SATUAN PEKERJAAN ( D + E ) 571,293.68
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.

IV - 240
Analisa EI-422

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : 4.2 (2)


JENIS PEKERJAAN : Lapis Pondasi Agregat Kelas B (Buruh)
SATUAN PEMBAYARAN : M3

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja Biasa (L01) Jam 0.5000 11,428.57 5,714.29


2. Mandor (L03) Jam 0.0167 17,142.86 286.29

JUMLAH HARGA TENAGA 6,000.57

B. BAHAN

1. Bahan Agg. Kelas B M27 M3 1.1864 325,335.00 385,977.44

JUMLAH HARGA BAHAN 385,977.44

C. PERALATAN

1. Tandem Roller E17 Jam 0.0201 445,867.99 8,961.95


2. Water Tanker E23 Jam 0.0141 362,404.86 5,109.91

JUMLAH HARGA PERALATAN 14,071.86

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 406,049.87


E. OVERHEAD & PROFIT 15.0 % x D 60,907.48
F. HARGA SATUAN PEKERJAAN ( D + E ) 466,957.35
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.

IV - 241
Analisa EI-192a rob

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : El-192a rob


JENIS PEKERJAAN : Udit Type U 300 X 300
SATUAN PEMBAYARAN : M'

PERKIRAAN HARGA JUMLAH


KUANTITAS SATUAN HARGA
NO. KOMPONEN SATUAN
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) jam 11.2000 11,428.57 128,000.00


2. Tukang (L02) jam 1.4000 15,714.29 22,000.00
3. Mandor (L03) jam 1.4000 17,142.86 24,000.00

JUMLAH HARGA TENAGA 174,000.00

B. BAHAN

1. U-Ditch Type U 300 / 300 1.0000 386,745.00 386,745.00


Panjang = 120 cm
2. Timbunan Porous (EI-161) M3 0.0000 0.00 0.00

JUMLAH HARGA BAHAN 386,745.00

C. PERALATAN

1. Tamper (E25) jam 0.0000 0.00 0.00


2. Flat Bed Truck (E11) jam 0.0643 477,880.80 30,727.74

JUMLAH HARGA PERALATAN 30,727.74

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 591,472.74


E. OVERHEAD & PROFIT 15.0 % x D 88,720.91
F. HARGA SATUAN PEKERJAAN ( D + E ) 680,193.65
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.

IV - 242
Analisa EI-192b rob

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : El-192b rob


JENIS PEKERJAAN : Udit Type U 400 X 400
SATUAN PEMBAYARAN : M'

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) jam 11.2000 11,428.57 128,000.00


2. Tukang (L02) jam 1.4000 15,714.29 22,000.00
3. Mandor (L03) jam 1.4000 17,142.86 24,000.00

JUMLAH HARGA TENAGA 174,000.00

B. BAHAN

1. U-Ditch Type U 400 / 400 1.0000 517,960.00 517,960.00


Panjang = 120 cm
2. Timbunan Porous (EI-161) M3 0.0000 0.00 0.00

JUMLAH HARGA BAHAN 517,960.00

C. PERALATAN

1. Tamper (E25) jam 0.0000 0.00 0.00


2. Flat Bed Truck (E11) jam 0.0643 477,880.80 30,727.74

JUMLAH HARGA PERALATAN 30,727.74

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 722,687.74


E. OVERHEAD & PROFIT 15.0 % x D 108,403.16
F. HARGA SATUAN PEKERJAAN ( D + E ) 831,090.90
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.

IV - 243
Analisa EI-181

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : El - 181


JENIS PEKERJAAN : Bok Culvert BC 400 X 400
SATUAN PEMBAYARAN : M'

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) jam 14.0000 11,428.57 160,000.00


2. Tukang (L02) jam 1.7500 15,714.29 27,500.00
3. Mandor (L03) jam 1.7500 17,142.86 30,000.00

JUMLAH HARGA TENAGA 217,500.00

B. BAHAN

1. Box Culvert BC 400 x 400 HD 1.0000 1,534,100.00 1,534,100.00


Panjang = 100 cm
2. Timbunan Porous (EI-161) M3 0.0000 0.00 0.00

JUMLAH HARGA BAHAN 1,534,100.00

C. PERALATAN

1. Tamper (E25) jam 0.0000 0.00 0.00


2. Flat Bed Truck (E11) jam 0.0803 477,880.80 38,373.83

JUMLAH HARGA PERALATAN 38,373.83

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 1,789,973.83


E. OVERHEAD & PROFIT 15.0 % x D 268,496.07
F. HARGA SATUAN PEKERJAAN ( D + E ) 2,058,469.90
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.

IV - 244
Analisa EI-182

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : 1.8 (2)


JENIS PEKERJAAN : Box Culvert BC 500 x 500 HD
SATUAN PEMBAYARAN : M'

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) jam 14.0000 11,428.57 160,000.00


2. Tukang (L02) jam 1.7500 15,714.29 27,500.00
3. Mandor (L03) jam 1.7500 17,142.86 30,000.00

JUMLAH HARGA TENAGA 217,500.00

B. BAHAN

1. Box Culvert BC 500 x 500 HD 1.0000 1,927,055.00 1,927,055.00


Panjang = 100 cm
2. Timbunan Porous (EI-161) M3 0.0000 0.00 0.00

JUMLAH HARGA BAHAN 1,927,055.00

C. PERALATAN

1. Tamper (E25) jam 0.0000 0.00 0.00


2. Flat Bed Truck (E11) jam 0.0803 477,880.80 38,373.83

JUMLAH HARGA PERALATAN 38,373.83

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 2,182,928.83


E. OVERHEAD & PROFIT 15.0 % x D 327,439.32
F. HARGA SATUAN PEKERJAAN ( D + E ) 2,510,368.15
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.

IV - 245
1 m2 Memasang Paving Block t = 8 cm (K - 250)

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja OH 0.2500 80,000.00 20,000.00


2. Tukang OH 0.5000 110,000.00 55,000.00
3. Kepala Tukang OH 0.0500 120,000.00 6,000.00
4 Mandor OH 0.0013 120,000.00 156.00

JUMLAH HARGA TENAGA 81,156.00

B. BAHAN

1. Paving block tebal 8 cm K-250 m2 1.0100 82,150.00 82,971.50


2. Pasir Beton m3 0.0500 244,375.00 12,218.75

JUMLAH HARGA BAHAN 93,596.50

C. PERALATAN

JUMLAH HARGA PERALATAN 0.00

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 174,752.50


E. OVERHEAD & PROFIT 15.0 % x D 26,212.88
F. HARGA SATUAN PEKERJAAN ( D + E ) 200,965.38
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.

1 m' Memasang Kansteen, tebal 10 x 20 x 40 cm

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja OH 0.6400 80,000.00 51,200.00


2. Tukang OH 0.1600 110,000.00 17,600.00
4 Mandor OH 0.1600 120,000.00 19,200.00

JUMLAH HARGA TENAGA 88,000.00

B. BAHAN

1. Kansteen 10 x 20 x 40 bh 2.5000 15,325.00 38,312.50


2 Semen zak 0.2510 81,650.00 20,494.15
3 Pasir Pasang m3 0.0350 222,812.50 7,798.44

JUMLAH HARGA BAHAN 66,605.09

C. PERALATAN

JUMLAH HARGA PERALATAN 0.00

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 154,605.09


E. OVERHEAD & PROFIT 15.0 % x D 23,190.76
F. HARGA SATUAN PEKERJAAN ( D + E ) 177,795.85
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN

IV - 246
yang dibayar dari kontrak) dan biaya-biaya lainnya.

IV - 247
Analisa EI-714

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : 7.1 (4)


JENIS PEKERJAAN : Perkerasan Jalan Beton Ready Mix K-225 (dengan angkutan)
SATUAN PEMBAYARAN : M3

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) jam 2.1084 11,428.57 24,096.00


2. Tukang (L02) jam 1.0040 15,714.29 15,777.14
3. Mandor (L03) jam 0.1004 17,142.86 1,721.14

JUMLAH HARGA TENAGA 41,594.29

B. BAHAN

1. Beton Ready Mix K-225 M3 1.0800 1,044,660.22 1,128,233.04


2. Karung Buah 5.0000 5,625.00 28,125.00
3. Curing Compound Liter 0.0000 0.00 0.00

JUMLAH HARGA BAHAN 1,156,358.04

C. PERALATAN

1. Concrete Vibrator (E20) jam 0.3333 52,746.13 17,580.29


2. Concrete Cutter (E54) jam 0.0000 0.00 0.00
3. Truck Pick Up (E53) jam 0.5972 119,564.87 71,404.14

JUMLAH HARGA PERALATAN 88,984.43

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 1,286,936.75


E. OVERHEAD & PROFIT 15.0 % x D 193,040.51
F. HARGA SATUAN PEKERJAAN ( D + E ) 1,479,977.26
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.

IV - 248
Analisa EI-619

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : 6.1 (9)


JENIS PEKERJAAN : Beton Struktur Site Mix K-125
SATUAN PEMBAYARAN : M3

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) jam 4.0964 11,428.57 46,816.00


2. Tukang (L02) jam 2.7309 15,714.29 42,914.14
3. Mandor (L03) jam 0.6827 17,142.86 11,703.43

JUMLAH HARGA TENAGA 101,433.57

B. BAHAN

1. Semen (M12) Kg 260.3500 1,633.00 425,151.55


2. Pasir Beton (M01a) M3 0.4849 244,375.00 118,497.44
3. Agregat Kasar (M03) M3 0.5066 345,000.00 174,777.00

JUMLAH HARGA BAHAN 718,425.99

C. PERALATAN

1. Concrete Mixer (E06) jam 0.6827 105,863.51 72,273.02


2. Water Tanker (E23) jam 0.0542 362,404.86 19,642.34
3. Concrete Vibrator (E20) jam 0.6827 70,246.91 47,957.56

JUMLAH HARGA PERALATAN 139,872.93

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 959,732.49


E. OVERHEAD & PROFIT 15.0 % x D 143,959.87
F. HARGA SATUAN PEKERJAAN ( D + E ) 1,103,692.36
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.

Sumber, 2020

Kepala Dinas Perumahan, Kawasan Permukiman


Dan Pertanahan Kabupaten Cirebon

H. SUKMA NUGRAHA, SH.,MM.


NIP. 19610301 198603 1 012

IV - 249
DAFTAR SATUAN ANALISA
DINAS PERUMAHAN KAWASAN PERMUKIMAN DAN PERTANAHAN
KABUPATEN CIREBON
TAHUN ANGGARAN 2017

HARGA SATUAN
NO KODE ANALISA SATUAN PEKERJAAN
Rp

1 A.3.2.1.3 Pemasangan 1 m3 pondasi batu belah campuran 1SP : 5PP 1,124,467.70


2 A.4.2.1.5. Pengerjaan 10 cm pengelasan dengan las listrik 50,098.89
3 A. 4.4.1.16 rob Pemasangan 1m2 dinding conblock HB20 campuran 1SP : 3PP 109,487.88
4 A. 4.4.1.17 rob Pemasangan 1m2 dinding conblock HB20 campuran 1SP : 4PP 113,809.79
5 A. 4.4.1.18 rob Pemasangan 1m2 dinding conblock HB15 campuran 1SP : 3PP 96,458.12
6 A. 4.4.1.19 rob Pemasangan 1 m2 dinding conblock HB15 campuran 1SP :4PP 96,425.48
7 A. 4.4.1.20 rob Pemasangan 1 m2 dinding conblock HB10 campuran 1SP :3PP 83,004.99
8 A. 4.4.1.21.rob Pemasangan 1 m2 dinding conblock HB10 campuran 1SP : 4PP 83,050.93
9 A. 4.4.1.24.rob Pemasangan 1 m2 dinding bata berongga ekspose 5x11x23 campuran 1SP :3PP 279,564.08
A.8.4.6 HARGA SATUAN PEKERJAAN ELEKTRIKAL
426 A.8.4.6.1 (K3) Pemasangan 1 buah titik lampu (Instalasi) 6,370,482.50
427 A.8.4.6.1 (K3) Pemasangan 1 buah MCB (Penyambungan Daya ke PLN) 6,165,495.00
- TAMBAHAN / LAIN-LAIN
428 - 1 Buah Pembuatan Papan Nama Proyek 425,318.88
429 SNI 7395:2008 N0.6.9Memasang 1 m2 lantai ubin granit ukuran 40 x 40 431,485.29
430 SNI 03-7395:2008 N0.6.9
Memasang 1 m2 lantai keramik ukuran 40 x 40 178,329.88
431 SNI 03-7395:2008 N0.6.9
Memasang 1 m2 lantai granit ukuran 60 x 60 352,538.19
432 SNI 2839:2008 N0.6.8Memasang 1 m' List Plafond Gypsum Profil 43,017.19
433 SNI 2839:2008 N0.6.81 m' Pasang Listplank Woodplank 59,110.00
434 ABK.990.07 Menurunkan 1 m2 atap genteng 2,146.67
435 ABK.990.09 Menurunkan 1 m2 rangka atap/Plafond 6,593.33
436 ABK.990.12 Menurunkan 1 m3 kayu rangka kuda-kuda 82,493.33
437 ABK.990.05 Membongkar 1 m2 lantai tegel/floor 7,053.33
438 SNI 2012 1 m³ Bongkaran Beton Bertulang 659,318.00
439 SNI 2012 1 m³ Bongkaran Dinding Tembok Bata Merah 617,918.00
440 ABK.300.19 1 m3 Pekerjaan Beton AD. 1:2:3 1,089,200.65
441 - 1m2 Pasang Plafond Rangka Holo dan Dengan Penutup GRC Berikut Pengecatan 123,063.23
442 - 1 Titik Pekerjaan Instalasi Lampu dan Stop Kontak 194,396.00
443 - 1 Bh Pekerjaan Stop Kontak 40,882.50
444 - 1 Bh Pekerjaan Lampu SL 18 Watt + Fitting 71,300.00
445 - 1 Unit Pekerjaan Sekring Kast 63,365.00
446 - 1 Bh Pekerjaan MCB Box 63,365.00
447 - 1 m' Pekerjaan Over Spaneng 40,330.50
448 - 1 Bh Pekerjaan Saklar Ganda 68,540.00
449 - 1 Bh Pekerjaan Saklar Tunggal 64,572.50
JALAN LINGKUNGAN
450 Analisa EI-311a : Galian Biasa / Kupasan (menggunakan alat berat) 114,458.93
451 Analisa EI-321.rob : Timbunan Biasa 377,121.30
452 Analisa EI-322.rob : Timbunan Pilihan 462,654.43
453 Analisa EI-331.rob : Penyiapan Badan Jalan 195.87
454 Analisa EI-611a : Lapis Resap Pengikat - Aspal Cair 16,145.36
455 Analisa EI-612a : Lapis Perekat - Aspal Cair 16,655.58
456 Analisa EI-621 : Agregat Penutup BURTU 19,529.97
457 Analisa EI-631.rob : Latasir Kelas A (SS-A) 69,844.63
458 Analisa EI-632.rob : Latasir Kelas B (SS-B) 78,592.17
459 Analisa EI-661 : Lapis Permukaan Penetrasi Macadam 2,476,741.15
460 Analisa EI-662 : Lapis Pondasi/Perata Penetrasi Macadam 2,628,149.13
461 Analisa EI-814 : Waterbound Macadam Utk. Pek. Minor 493,706.69
462 Analisa EI-817 : Penetrasi Macadam Utk.Pek.Minor (Perata) 2,411,230.62

Sumber, 2017

Kepala Dinas Perumahan, Kawasan Permukiman Dan Pertanahan Kabupaten Cirebon


HARGA SATUAN
NO KODE ANALISA SATUAN PEKERJAAN
Rp

H. SUKMA NUGRAHA, SH.,MM.


NIP. 19610301 198603 1 012
AT.02.a 1 m' Pengeboran Pilot hole Ø 6'' (daerah batuan keras)

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.3088 80,000.00 24,704.00
Tukang bor L.02 OH 0.0772 110,000.00 8,492.00
Mandor L.04 OH 0.0309 120,000.00 3,708.00
JUMLAH TENAGA KERJA 36,904.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN
Driling rig + perlengkapan m 0.541 805,000.00 435,102.50
JUMLAH HARGA ALAT 435,102.50
D Jumlah (A+B+C) 472,006.50
E Overhead & Profit 15.00% 70,800.98
F Harga Satuan Pekerjaan (D+E) 542,807.48

AT.02.b 1 m' Pengeboran Pilot hole Ø 6'' (daerah batuan sedang)

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.3088 80,000.00 24,704.00
Tukang bor L.02 OH 0.0772 110,000.00 8,492.00
Mandor L.04 OH 0.0309 120,000.00 3,708.00
JUMLAH TENAGA KERJA 36,904.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN
Driling rig + perlengkapan m 0.541 603,750.00 326,326.88
JUMLAH HARGA ALAT 326,326.88
D Jumlah (A+B+C) 363,230.88
E Overhead & Profit 15.00% 54,484.63
F Harga Satuan Pekerjaan (D+E) 417,715.51

AT.02.rob.1 1 m' Pengeboran sederhana

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.1544 80,000.00 12,352.00
Tukang bor L.02 OH 0.0386 110,000.00 4,246.00
Mandor L.04 OH 0.0155 120,000.00 1,854.00
JUMLAH TENAGA KERJA 18,452.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN
Driling rig + perlengkapan m 0.270 805,000.00 217,551.25
JUMLAH HARGA ALAT 217,551.25
D Jumlah (A+B+C) 236,003.25
E Overhead & Profit 15.00% 35,400.49
F Harga Satuan Pekerjaan (D+E) 271,403.74

V - 252
AT.03.a 1 m' Pengeboran Reaming Ø 10'' (daerah batuan keras)

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.2840 80,000.00 22,720.00
Tukang bor L.02 OH 0.0710 110,000.00 7,810.00
Mandor L.04 OH 0.0286 120,000.00 3,432.00
JUMLAH TENAGA KERJA 33,962.00
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN
Driling rig + perlengkapan m' 0.500 805,000.00 402,500.00
JUMLAH HARGA ALAT 402,500.00
D Jumlah (A+B+C) 436,462.00
E Overhead & Profit 15.00% 65,469.30
F Harga Satuan Pekerjaan (D+E) 501,931.30

AT.03.b 1 m' Pengeboran Reaming Ø 10'' (daerah batuan sedang)

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.2840 80,000.00 22,720.00
Tukang bor L.02 OH 0.0710 110,000.00 7,810.00
Mandor L.04 OH 0.0286 120,000.00 3,432.00
JUMLAH TENAGA KERJA 33,962.00
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN
Driling rig + perlengkapan m' 0.500 603,750.00 301,875.00
JUMLAH HARGA ALAT 301,875.00
D Jumlah (A+B+C) 335,837.00
E Overhead & Profit 15.00% 50,375.55
F Harga Satuan Pekerjaan (D+E) 386,212.55

AT.07 1 m' Pengadaan dan pemasangan konstuksi pipa cassing PVC 6''

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0720 80,000.00 5,760.00
Tukang bor L.02 OH 0.0180 110,000.00 1,980.00
Mandor L.04 OH 0.0071 120,000.00 852.00
JUMLAH TENAGA KERJA 8,592.00
B BAHAN
Pipa PVC 6'' m 1.0500 177,225.63 186,086.91
Centralizer Ls 0.1000 186,086.91 18,608.69
JUMLAH HARGA BAHAN 204,695.60
C PERALATAN
Driling rig + perlengkapan jam 0.1250 805,000.00 100,625.00
JUMLAH HARGA ALAT 100,625.00
D Jumlah (A+B+C) 313,912.60
E Overhead & Profit 15.00% 47,086.89

V - 253
F Harga Satuan Pekerjaan (D+E) 360,999.49

V - 254
AT.09 1 m' Pengadaan dan pemasangan konstuksi pipa cassing PVC 8''

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0800 80,000.00 6,400.00
Tukang bor L.02 OH 0.0200 110,000.00 2,200.00
Mandor L.04 OH 0.0082 120,000.00 984.00
JUMLAH TENAGA KERJA 9,584.00
B BAHAN
Pipa PVC 8'' m 1.0500 300,181.75 315,190.84
Centralizer Ls 0.1000 315,190.84 31,519.08
JUMLAH HARGA BAHAN 346,709.92
C PERALATAN
Driling rig + perlengkapan m 0.1429 805,000.00 115,034.50
JUMLAH HARGA ALAT 115,034.50
D Jumlah (A+B+C) 471,328.42
E Overhead & Profit 15.00% 70,699.26
F Harga Satuan Pekerjaan (D+E) 542,027.68

AT.12 1 m3 Pengadaan dan pemasangan gravel pack

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.0400 80,000.00 83,200.00
Tukang bor L.02 OH 0.2600 110,000.00 28,600.00
Mandor L.04 OH 0.1040 120,000.00 12,480.00
JUMLAH TENAGA KERJA 124,280.00
B BAHAN
Gravel pack pelabuhan m3 1.0000 1,380,000.00 1,380,000.00
ratu/sukabumi
JUMLAH HARGA BAHAN 1,380,000.00
C PERALATAN
Driling rig + perlengkapan m 1.8180 805,000.00 1,463,490.00
JUMLAH HARGA ALAT 1,463,490.00
D Jumlah (A+B+C) 2,967,770.00
E Overhead & Profit 15.00% 445,165.50
F Harga Satuan Pekerjaan (D+E) 3,412,935.50

AT.13 1 jam pencucian sumur

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.5720 80,000.00 45,760.00
Tukang bor L.02 OH 0.1430 110,000.00 15,730.00
Mandor L.04 OH 0.0570 120,000.00 6,840.00
JUMLAH TENAGA KERJA 68,330.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN
Driling rig + perlengkapan jam 1.0000 100,625.00 100,625.00
JUMLAH HARGA ALAT 100,625.00
D Jumlah (A+B+C) 168,955.00
E Overhead & Profit 15.00% 25,343.25
F Harga Satuan Pekerjaan (D+E) 194,298.25

V - 255
AT.14 1 jam Uji Pemompaan

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.5720 80,000.00 45,760.00
Tukang bor L.02 OH 0.1430 110,000.00 15,730.00
Mandor L.04 OH 0.0570 120,000.00 6,840.00
JUMLAH TENAGA KERJA 68,330.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN
Driling rig + perlengkapan jam 1.0000 100,625.00 100,625.00
JUMLAH HARGA ALAT 100,625.00
D Jumlah (A+B+C) 168,955.00
E Overhead & Profit 15.00% 25,343.25
F Harga Satuan Pekerjaan (D+E) 194,298.25

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
pekerja L.01 OH 1.500 80,000.00 120,000.00
mandor L.02 OH 0.050 120,000.00 6,000.00
JUMLAH TENAGA KERJA 126,000.00

1 m' Pemasangan pipa PVC dia. 350 mm melalui galian tanah berbatu / bongkar jalan

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah berbatu / bongkar jalan 0.880 126,000.00 110,880.00


m³ Urugan pasir 0.240 336,381.90 80,731.66
m³ Urugan tanah kembali 0.600 52,900.00 31,740.00
m³ Buang tanah sisa galian 0.040 31,740.00 1,269.60
m' Pemasangan pipa PVC dia. 350 mm 1 5,500.00 5,500.00
ls Perapihan 1 1,650.00 1,650.00
JUMLAH 231,771.26

1 m' Pemasangan pipa PVC dia. 300 mm melalui galian tanah berbatu / bongkar jalan

m³ Galian tanah berbatu / bongkar jalan 0.825 126,000.00 103,950.00


m³ Urugan pasir 0.225 336,381.90 75,685.93
m³ Urugan tanah kembali 0.563 52,900.00 29,756.25
m³ Buang tanah sisa galian 0.038 31,740.00 1,190.25
m' Pemasangan pipa PVC dia. 300 mm 1 5,000.00 5,000.00
ls Perapihan 1 1,650.00 1,650.00
JUMLAH 217,232.43

1 m' Pemasangan pipa PVC dia. 250 mm melalui galian tanah berbatu / bongkar jalan

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah berbatu / bongkar jalan 0.715 126,000.00 90,090.00


m³ Urugan pasir 0.195 336,381.90 65,594.47
m³ Urugan tanah kembali 0.488 52,900.00 25,788.75
m³ Buang tanah sisa galian 0.033 31,740.00 1,031.55

V - 256
m' Pemasangan pipa PVC dia. 250 mm 1 4,500.00 4,500.00
ls Perapihan 1 1,650.00 1,650.00
JUMLAH 188,654.77

V - 257
1 m' Pemasangan pipa PVC dia. 200 mm melalui galian tanah berbatu / bongkar jalan

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah berbatu / bongkar jalan 0.600 126,000.00 75,600.00


m³ Urugan pasir 0.120 336,381.90 40,365.83
m³ Urugan tanah kembali 0.450 52,900.00 23,805.00
m³ Buang tanah sisa galian 0.030 31,740.00 952.20
m' Pemasangan pipa PVC dia. 200 mm 1 4,000.00 4,000.00
ls Perapihan 1 1,650.00 1,650.00
JUMLAH 146,373.03

1 m' Pemasangan pipa PVC dia. 160 mm melalui galian tanah berbatu / bongkar jalan
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah berbatu / bongkar jalan 0.450 126,000.00 56,700.00


m³ Urugan pasir 0.100 336,381.90 33,638.19
m³ Urugan tanah kembali 0.325 52,900.00 17,192.50
m³ Buang tanah sisa galian 0.025 31,740.00 793.50
m' Pemasangan pipa PVC dia. 160 mm 1 3,500.00 3,500.00
ls Perapihan 1 1,650.00 1,650.00
JUMLAH 113,474.19

1 m' Pemasangan pipa PVC dia. 110 mm melalui galian tanah berbatu / bongkar jalan
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah berbatu / bongkar jalan 0.360 126,000.00 45,360.00


m³ Urugan pasir 0.080 336,381.90 26,910.55
m³ Urugan tanah kembali 0.260 52,900.00 13,754.00
m³ Buang tanah sisa galian 0.020 31,740.00 634.80
m' Pemasangan pipa PVC dia. 110 mm 1 3,000.00 3,000.00
ls Perapihan 1 1,650.00 1,650.00
JUMLAH 91,309.35

1 m' Pemasangan pipa PVC dia. 90 mm melalui galian tanah berbatu / bongkar jalan
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah berbatu / bongkar jalan 0.320 126,000.00 40,320.00


m³ Urugan pasir 0.080 336,381.90 26,910.55
m³ Urugan tanah kembali 0.220 52,900.00 11,638.00
m³ Buang tanah sisa galian 0.020 31,740.00 634.80
m' Pemasangan pipa PVC dia. 90 mm 1 2,500.00 2,500.00
ls Perapihan 1 1,650.00 1,650.00
JUMLAH 83,653.35

1 m' Pemasangan pipa PVC dia. 63 mm melalui galian tanah berbatu / bongkar jalan
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah berbatu / bongkar jalan 0.180 126,000.00 22,680.00


m³ Urugan pasir 0.060 336,381.90 20,182.91
m³ Urugan tanah kembali 0.105 52,900.00 5,554.50
m³ Buang tanah sisa galian 0.015 31,740.00 476.10
m' Pemasangan pipa PVC dia. 63 mm 1 2,000.00 2,000.00
ls Perapihan 1 1,650.00 1,650.00
JUMLAH 52,543.51

V - 258
1 m' Pemasangan pipa PVC dia. 50 mm melalui galian tanah berbatu / bongkar jalan
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah berbatu / bongkar jalan 0.180 126,000.00 22,680.00


m³ Urugan pasir 0.060 336,381.90 20,182.91
m³ Urugan tanah kembali 0.105 52,900.00 5,554.50
m³ Buang tanah sisa galian 0.015 31,740.00 476.10
m' Pemasangan pipa PVC dia. 50 mm 1 1,500.00 1,500.00
ls Perapihan 1 1,650.00 1,650.00
JUMLAH 52,043.51
1 m' Pemasangan pipa PVC dia. 25 mm melalui galian tanah berbatu / bongkar jalan

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah berbatu / bongkar jalan 0.120 126,000.00 15,120.00


m³ Urugan tanah kembali 0.105 52,900.00 5,554.50
m³ Buang tanah sisa galian 0.015 31,740.00 476.10
m' Pemasangan pipa PVC dia. 25 mm 1 1,000.00 1,000.00
ls Perapihan 1 1,650.00 1,650.00
JUMLAH 23,800.60

1 m' Pemasangan pipa PVC dia. 350 mm melalui galian tanah keras / berbatu

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah keras / berbatu 0.880 96,416.00 84,846.08


m³ Urugan pasir 0.240 336,381.90 80,731.66
m³ Urugan tanah kembali 0.600 52,900.00 31,740.00
m³ Buang tanah sisa galian 0.040 31,740.00 1,269.60
m' Pemasangan pipa PVC dia. 350 mm 1 5,500.00 5,500.00
ls Perapihan 1 1,650.00 1,650.00
JUMLAH 205,737.34

1 m' Pemasangan pipa PVC dia. 300 mm melalui galian tanah keras / berbatu

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah keras / berbatu 0.825 96,416.00 79,543.20


m³ Urugan pasir 0.225 336,381.90 75,685.93
m³ Urugan tanah kembali 0.563 52,900.00 29,756.25
m³ Buang tanah sisa galian 0.038 31,740.00 1,190.25
m' Pemasangan pipa PVC dia. 300 mm 1 5,000.00 5,000.00
ls Perapihan 1 1,650.00 1,650.00
JUMLAH 192,825.63

1 m' Pemasangan pipa PVC dia. 250 mm melalui galian tanah keras / berbatu

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah keras / berbatu 0.715 96,416.00 68,937.44


m³ Urugan pasir 0.195 336,381.90 65,594.47
m³ Urugan tanah kembali 0.488 52,900.00 25,788.75
m³ Buang tanah sisa galian 0.033 31,740.00 1,031.55
m' Pemasangan pipa PVC dia. 250 mm 1 4,500.00 4,500.00
ls Perapihan 1 1,650.00 1,650.00
JUMLAH 167,502.21

V - 259
1 m' Pemasangan pipa PVC dia. 200 mm melalui galian tanah keras / berbatu

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah keras / berbatu 0.600 96,416.00 57,849.60


m³ Urugan pasir 0.120 336,381.90 40,365.83
m³ Urugan tanah kembali 0.450 52,900.00 23,805.00
m³ Buang tanah sisa galian 0.030 31,740.00 952.20
m' Pemasangan pipa PVC dia. 200 mm 1 4,000.00 4,000.00
ls Perapihan 1 1,650.00 1,650.00
JUMLAH 128,622.63

1 m' Pemasangan pipa PVC dia. 160 mm melalui galian tanah keras / berbatu
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah keras / berbatu 0.450 96,416.00 43,387.20


m³ Urugan pasir 0.100 336,381.90 33,638.19
m³ Urugan tanah kembali 0.325 52,900.00 17,192.50
m³ Buang tanah sisa galian 0.025 31,740.00 793.50
m' Pemasangan pipa PVC dia. 160 mm 1 3,500.00 3,500.00
ls Perapihan 1 1,650.00 1,650.00
JUMLAH 100,161.39

1 m' Pemasangan pipa PVC dia. 110 mm melalui galian tanah keras / berbatu
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah keras / berbatu 0.360 96,416.00 34,709.76


m³ Urugan pasir 0.080 336,381.90 26,910.55
m³ Urugan tanah kembali 0.260 52,900.00 13,754.00
m³ Buang tanah sisa galian 0.020 31,740.00 634.80
m' Pemasangan pipa PVC dia. 110 mm 1 3,000.00 3,000.00
ls Perapihan 1 1,650.00 1,650.00
JUMLAH 80,659.11

1 m' Pemasangan pipa PVC dia. 90 mm melalui galian tanah keras / berbatu
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah keras / berbatu 0.320 96,416.00 30,853.12


m³ Urugan pasir 0.080 336,381.90 26,910.55
m³ Urugan tanah kembali 0.220 52,900.00 11,638.00
m³ Buang tanah sisa galian 0.020 31,740.00 634.80
m' Pemasangan pipa PVC dia. 90 mm 1 2,500.00 2,500.00
ls Perapihan 1 1,650.00 1,650.00
JUMLAH 74,186.47

1 m' Pemasangan pipa PVC dia. 63 mm melalui galian tanah keras / berbatu
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah keras / berbatu 0.180 96,416.00 17,354.88


m³ Urugan pasir 0.060 336,381.90 20,182.91
m³ Urugan tanah kembali 0.105 52,900.00 5,554.50
m³ Buang tanah sisa galian 0.015 31,740.00 476.10
m' Pemasangan pipa PVC dia. 63 mm 1 2,000.00 2,000.00
ls Perapihan 1 1,650.00 1,650.00
JUMLAH 47,218.39

V - 260
1 m' Pemasangan pipa PVC dia. 50 mm melalui galian tanah keras / berbatu
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah keras / berbatu 0.180 96,416.00 17,354.88


m³ Urugan pasir 0.060 336,381.90 20,182.91
m³ Urugan tanah kembali 0.105 52,900.00 5,554.50
m³ Buang tanah sisa galian 0.015 31,740.00 476.10
m' Pemasangan pipa PVC dia. 50 mm 1 1,500.00 1,500.00
ls Perapihan 1 1,650.00 1,650.00
JUMLAH 46,718.39

1 m' Pemasangan pipa PVC dia. 25 mm melalui galian tanah keras / berbatu

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah keras / berbatu 0.120 96,416.00 11,569.92


m³ Urugan tanah kembali 0.105 52,900.00 5,554.50
m³ Buang tanah sisa galian 0.015 31,740.00 476.10
m' Pemasangan pipa PVC dia. 25 mm 1 1,000.00 1,000.00
ls Perapihan 1 1,650.00 1,650.00
JUMLAH 20,250.52

1 m' Pemasangan pipa PVC dia. 350 mm melalui galian tanah biasa

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah biasa 0.880 72,450.00 63,756.00


m³ Urugan pasir 0.240 336,381.90 80,731.66
m³ Urugan tanah kembali 0.600 52,900.00 31,740.00
m³ Buang tanah sisa galian 0.040 31,740.00 1,269.60
m' Pemasangan pipa PVC dia. 350 mm 1 5,500.00 5,500.00
ls Perapihan 1 1,650.00 1,650.00
JUMLAH 184,647.26

1 m' Pemasangan pipa PVC dia. 300 mm melalui galian tanah biasa

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah biasa 0.825 72,450.00 59,771.25


m³ Urugan pasir 0.225 336,381.90 75,685.93
m³ Urugan tanah kembali 0.563 52,900.00 29,756.25
m³ Buang tanah sisa galian 0.038 31,740.00 1,190.25
m' Pemasangan pipa PVC dia. 300 mm 1 5,000.00 5,000.00
ls Perapihan 1 1,650.00 1,650.00
JUMLAH 173,053.68

1 m' Pemasangan pipa PVC dia. 250 mm melalui galian tanah biasa

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah biasa 0.715 72,450.00 51,801.75


m³ Urugan pasir 0.195 336,381.90 65,594.47
m³ Urugan tanah kembali 0.488 52,900.00 25,788.75
m³ Buang tanah sisa galian 0.033 31,740.00 1,031.55
m' Pemasangan pipa PVC dia. 250 mm 1 4,500.00 4,500.00
ls Perapihan 1 1,650.00 1,650.00
JUMLAH 150,366.52

V - 261
1 m' Pemasangan pipa PVC dia. 200 mm melalui galian tanah biasa

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah biasa 0.600 72,450.00 43,470.00


m³ Urugan pasir 0.120 336,381.90 40,365.83
m³ Urugan tanah kembali 0.450 52,900.00 23,805.00
m³ Buang tanah sisa galian 0.030 31,740.00 952.20
m' Pemasangan pipa PVC dia. 200 mm 1 4,000.00 4,000.00
ls Perapihan 1 1,650.00 1,650.00
JUMLAH 114,243.03
1 m' Pemasangan pipa PVC dia. 160 mm melalui galian tanah biasa

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah biasa 0.450 72,450.00 32,602.50


m³ Urugan pasir 0.100 336,381.90 33,638.19
m³ Urugan tanah kembali 0.325 52,900.00 17,192.50
m³ Buang tanah sisa galian 0.025 31,740.00 793.50
m' Pemasangan pipa PVC dia. 160 mm 1 3,500.00 3,500.00
ls Perapihan 1 1,650.00 1,650.00
JUMLAH 89,376.69

1 m' Pemasangan pipa PVC dia. 110 mm melalui galian tanah biasa

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah biasa 0.360 72,450.00 26,082.00


m³ Urugan pasir 0.080 336,381.90 26,910.55
m³ Urugan tanah kembali 0.260 52,900.00 13,754.00
m³ Buang tanah sisa galian 0.020 31,740.00 634.80
m' Pemasangan pipa PVC dia. 110 mm 1 3,000.00 3,000.00
ls Perapihan 1 1,650.00 1,650.00
JUMLAH 72,031.35

1 m' Pemasangan pipa PVC dia. 90 mm melalui galian tanah biasa

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah biasa 0.320 72,450.00 23,184.00


m³ Urugan pasir 0.080 336,381.90 26,910.55
m³ Urugan tanah kembali 0.220 52,900.00 11,638.00
m³ Buang tanah sisa galian 0.020 31,740.00 634.80
m' Pemasangan pipa PVC dia. 90 mm 1 2,500.00 2,500.00
ls Perapihan 1 1,650.00 1,650.00
JUMLAH 66,517.35

1 m' Pemasangan pipa PVC dia. 63 mm melalui galian tanah biasa

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah biasa 0.180 72,450.00 13,041.00


m³ Urugan pasir 0.060 336,381.90 20,182.91
m³ Urugan tanah kembali 0.105 52,900.00 5,554.50
m³ Buang tanah sisa galian 0.015 31,740.00 476.10
m' Pemasangan pipa PVC dia. 63 mm 1 2,000.00 2,000.00
ls Perapihan 1 1,650.00 1,650.00
JUMLAH 42,904.51

V - 262
1 m' Pemasangan pipa PVC dia. 50 mm melalui galian tanah biasa

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah biasa 0.180 72,450.00 13,041.00


m³ Urugan pasir 0.060 336,381.90 20,182.91
m³ Urugan tanah kembali 0.105 52,900.00 5,554.50
m³ Buang tanah sisa galian 0.015 31,740.00 476.10
m' Pemasangan pipa PVC dia. 50 mm 1 1,500.00 1,500.00
ls Perapihan 1 1,650.00 1,650.00
JUMLAH 42,404.51

1 m' Pemasangan pipa PVC dia. 25 mm melalui galian tanah biasa


Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah biasa 0.120 72,450.00 8,694.00


m³ Urugan tanah kembali 0.105 52,900.00 5,554.50
m³ Buang tanah sisa galian 0.015 31,740.00 476.10
m' Pemasangan pipa PVC dia. 25 mm 1 1,000.00 1,000.00
ls Perapihan 1 1,650.00 1,650.00
JUMLAH 17,374.60

1 m' Perbaikan pipa PVC dia. 350 mm melalui galian tanah berbatu / bongkar jalan
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah berbatu / bongkar jalan 0.880 126,000.00 110,880.00


m³ Urugan pasir 0.240 336,381.90 80,731.66
m³ Urugan tanah kembali 0.600 52,900.00 31,740.00
m³ Buang tanah sisa galian 0.040 31,740.00 1,269.60
ls Perbaikan pipa PVC dia. 350 mm 1 144,500.00 144,500.00
ls Perapihan 1 19,700.00 19,700.00
JUMLAH 388,821.26

1 m' Perbaikan pipa PVC dia. 300 mm melalui galian tanah berbatu / bongkar jalan
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah berbatu / bongkar jalan 0.825 126,000.00 103,950.00


m³ Urugan pasir 0.225 336,381.90 75,685.93
m³ Urugan tanah kembali 0.563 52,900.00 29,782.70
m³ Buang tanah sisa galian 0.038 31,740.00 1,206.12
ls Perbaikan pipa PVC dia. 300 mm 1 105,000.00 105,000.00
ls Perapihan 1 17,700.00 17,700.00
JUMLAH 333,324.75

1 m' Perbaikan pipa PVC dia. 250 mm melalui galian tanah berbatu / bongkar jalan
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah berbatu / bongkar jalan 0.715 126,000.00 90,090.00


m³ Urugan pasir 0.195 336,381.90 65,594.47
m³ Urugan tanah kembali 0.488 52,900.00 25,815.20
m³ Buang tanah sisa galian 0.033 31,740.00 1,047.42
ls Perbaikan pipa PVC dia. 250 mm 1 83,350.00 83,350.00
ls Perapihan 1 15,700.00 15,700.00
JUMLAH 281,597.09

V - 263
1 m' Perbaikan pipa PVC dia. 200 mm melalui galian tanah berbatu / bongkar jalan
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah berbatu / bongkar jalan 0.600 126,000.00 75,600.00


m³ Urugan pasir 0.120 336,381.90 40,365.83
m³ Urugan tanah kembali 0.450 52,900.00 23,805.00
m³ Buang tanah sisa galian 0.030 31,740.00 952.20
ls Perbaikan pipa PVC dia. 200 mm 1 76,150.00 76,150.00
ls Perapihan 1 15,700.00 15,700.00
JUMLAH 232,573.03

1 m' Perbaikan pipa PVC dia. 160 mm melalui galian tanah berbatu / bongkar jalan

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah berbatu / bongkar jalan 0.450 126,000.00 56,700.00


m³ Urugan pasir 0.100 336,381.90 33,638.19
m³ Urugan tanah kembali 0.325 52,900.00 17,192.50
m³ Buang tanah sisa galian 0.025 31,740.00 793.50
ls Perbaikan pipa PVC dia. 160 mm 1 52,500.00 52,500.00
ls Perapihan 1 13,700.00 13,700.00
JUMLAH 174,524.19

1 m' Perbaikan pipa PVC dia. 110 mm melalui galian tanah berbatu / bongkar jalan

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah berbatu / bongkar jalan 0.360 126,000.00 45,360.00


m³ Urugan pasir 0.080 336,381.90 26,910.55
m³ Urugan tanah kembali 0.260 52,900.00 13,754.00
m³ Buang tanah sisa galian 0.020 31,740.00 634.80
ls Perbaikan pipa PVC dia. 110 mm 1 43,350.00 43,350.00
ls Perapihan 1 11,700.00 11,700.00
JUMLAH 141,709.35

1 m' Perbaikan pipa PVC dia. 90 mm melalui galian tanah berbatu / bongkar jalan

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah berbatu / bongkar jalan 0.320 126,000.00 40,320.00


m³ Urugan pasir 0.080 336,381.90 26,910.55
m³ Urugan tanah kembali 0.220 52,900.00 11,638.00
m³ Buang tanah sisa galian 0.020 31,740.00 634.80
ls Perbaikan pipa PVC dia. 90 mm 1 32,250.00 32,250.00
ls Perapihan 1 11,700.00 11,700.00
JUMLAH 123,453.35

1 m' Perbaikan pipa PVC dia. 63 mm melalui galian tanah berbatu / bongkar jalan

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah berbatu / bongkar jalan 0.180 126,000.00 22,680.00


m³ Urugan pasir 0.060 336,381.90 20,182.91
m³ Urugan tanah kembali 0.105 52,900.00 5,554.50
m³ Buang tanah sisa galian 0.015 31,740.00 476.10
ls Perbaikan pipa PVC dia. 63 mm 1 17,100.00 17,100.00
ls Perapihan 1 11,700.00 11,700.00
JUMLAH 77,693.51

V - 264
1 m' Perbaikan pipa PVC dia. 50 mm melalui galian tanah berbatu / bongkar jalan

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah berbatu / bongkar jalan 0.180 126,000.00 22,680.00


m³ Urugan pasir 0.060 336,381.90 20,182.91
m³ Urugan tanah kembali 0.105 52,900.00 5,554.50
m³ Buang tanah sisa galian 0.015 31,740.00 476.10
ls Perbaikan pipa PVC dia. 50 mm 1 11,850.00 11,850.00
ls Perapihan 1 11,700.00 11,700.00
JUMLAH 72,443.51

1 m' Perbaikan pipa PVC dia. 25 mm melalui galian tanah berbatu / bongkar jalan

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah berbatu / bongkar jalan 0.120 126,000.00 15,120.00


m³ Urugan tanah kembali 0.105 52,900.00 5,554.50
m³ Buang tanah sisa galian 0.015 31,740.00 476.10
ls Perbaikan pipa PVC dia. 25 mm 1 7,900.00 7,900.00
ls Perapihan 1 11,700.00 11,700.00
JUMLAH 40,750.60

1 m' Perbaikan pipa PVC dia. 350 mm melalui galian tanah keras / berbatu

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah keras / berbatu 0.880 96,416.00 84,846.08


m³ Urugan pasir 0.240 336,381.90 80,731.66
m³ Urugan tanah kembali 0.600 52,900.00 31,740.00
m³ Buang tanah sisa galian 0.040 31,740.00 1,269.60
ls Perbaikan pipa PVC dia. 350 mm 1 144,500.00 144,500.00
ls Perapihan 1 19,700.00 19,700.00
JUMLAH 362,787.34

1 m' Perbaikan pipa PVC dia. 300 mm melalui galian tanah keras / berbatu

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah keras / berbatu 0.825 96,416.00 79,543.20


m³ Urugan pasir 0.225 336,381.90 75,685.93
m³ Urugan tanah kembali 0.563 52,900.00 29,782.70
m³ Buang tanah sisa galian 0.033 31,740.00 1,047.42
ls Perbaikan pipa PVC dia. 300 mm 1 105,000.00 105,000.00
ls Perapihan 1 17,700.00 17,700.00
JUMLAH 308,759.25

1 m' Perbaikan pipa PVC dia. 250 mm melalui galian tanah keras / berbatu

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah keras / berbatu 0.715 96,416.00 68,937.44


m³ Urugan pasir 0.195 336,381.90 65,594.47
m³ Urugan tanah kembali 0.488 52,900.00 25,815.20
m³ Buang tanah sisa galian 0.033 31,740.00 1,047.42
ls Perbaikan pipa PVC dia. 250 mm 1 83,350.00 83,350.00
ls Perapihan 1 15,700.00 15,700.00
JUMLAH 260,444.53

V - 265
1 m' Perbaikan pipa PVC dia. 200 mm melalui galian tanah keras / berbatu

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah keras / berbatu 0.600 96,416.00 57,849.60


m³ Urugan pasir 0.120 336,381.90 40,365.83
m³ Urugan tanah kembali 0.450 52,900.00 23,805.00
m³ Buang tanah sisa galian 0.030 31,740.00 952.20
ls Perbaikan pipa PVC dia. 200 mm 1 76,150.00 76,150.00
ls Perapihan 1 15,700.00 15,700.00
JUMLAH 214,822.63

1 m' Perbaikan pipa PVC dia. 160 mm melalui galian tanah keras / berbatu

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah keras / berbatu 0.450 96,416.00 43,387.20


m³ Urugan pasir 0.100 336,381.90 33,638.19
m³ Urugan tanah kembali 0.325 52,900.00 17,192.50
m³ Buang tanah sisa galian 0.025 31,740.00 793.50
ls Perbaikan pipa PVC dia. 160 mm 1 52,500.00 52,500.00
ls Perapihan 1 13,700.00 13,700.00
JUMLAH 161,211.39

1 m' Perbaikan pipa PVC dia. 110 mm melalui galian tanah keras / berbatu

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah keras / berbatu 0.360 96,416.00 34,709.76


m³ Urugan pasir 0.080 336,381.90 26,910.55
m³ Urugan tanah kembali 0.260 52,900.00 13,754.00
m³ Buang tanah sisa galian 0.020 31,740.00 634.80
ls Perbaikan pipa PVC dia. 110 mm 1 43,350.00 43,350.00
ls Perapihan 1 11,700.00 11,700.00
JUMLAH 131,059.11

1 m' Perbaikan pipa PVC dia. 90 mm melalui galian tanah keras / berbatu

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah keras / berbatu 0.320 96,416.00 30,853.12


m³ Urugan pasir 0.080 336,381.90 26,910.55
m³ Urugan tanah kembali 0.220 52,900.00 11,638.00
m³ Buang tanah sisa galian 0.020 31,740.00 634.80
ls Perbaikan pipa PVC dia. 90 mm 1 32,250.00 32,250.00
ls Perapihan 1 11,700.00 11,700.00
JUMLAH 113,986.47

1 m' Perbaikan pipa PVC dia. 63 mm melalui galian tanah keras / berbatu

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah keras / berbatu 0.180 96,416.00 17,354.88


m³ Urugan pasir 0.060 336,381.90 20,182.91
m³ Urugan tanah kembali 0.105 52,900.00 5,554.50
m³ Buang tanah sisa galian 0.015 31,740.00 476.10
ls Perbaikan pipa PVC dia. 63 mm 1 17,100.00 17,100.00
ls Perapihan 1 11,700.00 11,700.00
JUMLAH 72,368.39

V - 266
1 m' Perbaikan pipa PVC dia. 50 mm melalui galian tanah keras / berbatu

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah keras / berbatu 0.180 96,416.00 17,354.88


m³ Urugan pasir 0.060 336,381.90 20,182.91
m³ Urugan tanah kembali 0.105 52,900.00 5,554.50
m³ Buang tanah sisa galian 0.015 31,740.00 476.10
ls Perbaikan pipa PVC dia. 50 mm 1 11,850.00 11,850.00
ls Perapihan 1 11,700.00 11,700.00
JUMLAH 67,118.39

1 m' Perbaikan pipa PVC dia. 25 mm melalui galian tanah keras / berbatu

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah keras / berbatu 0.120 96,416.00 11,569.92


m³ Urugan tanah kembali 0.105 52,900.00 5,554.50
m³ Buang tanah sisa galian 0.015 31,740.00 476.10
ls Perbaikan pipa PVC dia. 25 mm 1 7,900.00 7,900.00
ls Perapihan 1 11,700.00 11,700.00
JUMLAH 37,200.52

1 m' Perbaikan pipa PVC dia. 350 mm melalui galian tanah biasa

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah biasa 0.880 72,450.00 63,756.00


m³ Urugan pasir 0.240 336,381.90 80,731.66
m³ Urugan tanah kembali 0.600 52,900.00 31,740.00
m³ Buang tanah sisa galian 0.040 31,740.00 1,269.60
ls Perbaikan pipa PVC dia. 350 mm 1 144,500.00 144,500.00
ls Perapihan 1 19,700.00 19,700.00
JUMLAH 341,697.26

1 m' Perbaikan pipa PVC dia. 300 mm melalui galian tanah biasa

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah biasa 0.825 72,450.00 59,771.25


m³ Urugan pasir 0.225 336,381.90 75,685.93
m³ Urugan tanah kembali 0.563 52,900.00 29,782.70
m³ Buang tanah sisa galian 0.038 31,740.00 1,206.12
ls Perbaikan pipa PVC dia. 300 mm 1 105,000.00 105,000.00
ls Perapihan 1 17,700.00 17,700.00
JUMLAH 289,146.00

1 m' Perbaikan pipa PVC dia. 250 mm melalui galian tanah biasa

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah biasa 0.715 72,450.00 51,801.75


m³ Urugan pasir 0.195 336,381.90 65,594.47
m³ Urugan tanah kembali 0.488 52,900.00 25,815.20
m³ Buang tanah sisa galian 0.033 31,740.00 1,047.42
ls Perbaikan pipa PVC dia. 250 mm 1 83,350.00 83,350.00
ls Perapihan 1 15,700.00 15,700.00

V - 267
JUMLAH 243,308.84

V - 268
1 m' Perbaikan pipa PVC dia. 200 mm melalui galian tanah biasa

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah biasa 0.600 72,450.00 43,470.00


m³ Urugan pasir 0.120 336,381.90 40,365.83
m³ Urugan tanah kembali 0.450 52,900.00 23,805.00
m³ Buang tanah sisa galian 0.030 31,740.00 952.20
ls Perbaikan pipa PVC dia. 200 mm 1 76,150.00 76,150.00
ls Perapihan 1 15,700.00 15,700.00
JUMLAH 200,443.03

1 m' Perbaikan pipa PVC dia. 160 mm melalui galian tanah biasa

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah biasa 0.450 72,450.00 32,602.50


m³ Urugan pasir 0.100 336,381.90 33,638.19
m³ Urugan tanah kembali 0.325 52,900.00 17,192.50
m³ Buang tanah sisa galian 0.025 31,740.00 793.50
ls Perbaikan pipa PVC dia. 160 mm 1 52,500.00 52,500.00
ls Perapihan 1 13,700.00 13,700.00
JUMLAH 150,426.69

1 m' Perbaikan pipa PVC dia. 110 mm melalui galian tanah biasa

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah biasa 0.360 72,450.00 26,082.00


m³ Urugan pasir 0.080 336,381.90 26,910.55
m³ Urugan tanah kembali 0.260 52,900.00 13,754.00
m³ Buang tanah sisa galian 0.020 31,740.00 634.80
ls Perbaikan pipa PVC dia. 110 mm 1 43,350.00 43,350.00
ls Perapihan 1 11,700.00 11,700.00
JUMLAH 122,431.35

1 m' Perbaikan pipa PVC dia. 90 mm melalui galian tanah biasa

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah biasa 0.320 72,450.00 23,184.00


m³ Urugan pasir 0.080 336,381.90 26,910.55
m³ Urugan tanah kembali 0.220 52,900.00 11,638.00
m³ Buang tanah sisa galian 0.020 31,740.00 634.80
ls Perbaikan pipa PVC dia. 90 mm 1 32,250.00 32,250.00
ls Perapihan 1 11,700.00 11,700.00
JUMLAH 106,317.35

1 m' Perbaikan pipa PVC dia. 63 mm melalui galian tanah biasa

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah biasa 0.180 72,450.00 13,041.00


m³ Urugan pasir 0.060 336,381.90 20,182.91
m³ Urugan tanah kembali 0.105 52,900.00 5,554.50
m³ Buang tanah sisa galian 0.015 31,740.00 476.10
ls Perbaikan pipa PVC dia. 63 mm 1 17,100.00 17,100.00
ls Perapihan 1 11,700.00 11,700.00
JUMLAH 68,054.51

V - 269
1 m' Perbaikan pipa PVC dia. 50 mm melalui galian tanah biasa

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah biasa 0.180 72,450.00 13,041.00


m³ Urugan pasir 0.060 336,381.90 20,182.91
m³ Urugan tanah kembali 0.105 52,900.00 5,554.50
m³ Buang tanah sisa galian 0.015 31,740.00 476.10
ls Perbaikan pipa PVC dia. 50 mm 1 11,850.00 11,850.00
ls Perapihan 1 11,700.00 11,700.00
JUMLAH 62,804.51

1 m' Perbaikan pipa PVC dia. 25 mm melalui galian tanah biasa

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah biasa 0.120 72,450.00 8,694.00


m³ Urugan tanah kembali 0.105 52,900.00 5,554.50
m³ Buang tanah sisa galian 0.015 31,740.00 476.10
ls Perbaikan pipa PVC dia. 25 mm 1 7,900.00 7,900.00
ls Perapihan 1 11,700.00 11,700.00
JUMLAH 34,324.60

400 m' Pengetesan pipa PVC dia. 350 mm

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

ls penyediaan alat bantu dan pek. pengedopan 1.000 157,500.00 157,500.00


ls biaya perpompaan 1.000 105,000.00 105,000.00
m³ penyediaan air bersih 37.000 31,500.00 1,165,500.00
hr biaya mesin test, BBM, dan servis 7.000 52,500.00 367,500.00
mekanik 3.500 110,000.00 385,000.00
tukang pipa 7.000 110,000.00 770,000.00
kepala tukang 0.700 120,000.00 84,000.00
pekerja 7.000 80,000.00 560,000.00
mandor 0.350 120,000.00 42,000.00
JUMLAH 3,636,500.00
Per m' Pengetesan Pipa PVC dia. 350 mm = 1/400 x Rp. 3,636,500.00 9,091.25

400 m' Pengetesan pipa PVC dia. 300 mm

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

ls penyediaan alat bantu dan pek. pengedopan 1.000 157,500.00 157,500.00


ls biaya perpompaan 1.000 105,000.00 105,000.00
m³ penyediaan air bersih 28.000 31,500.00 882,000.00
hr biaya mesin test, BBM, dan servis 6.000 52,500.00 315,000.00
mekanik 3.000 110,000.00 330,000.00
tukang pipa 6.000 110,000.00 660,000.00
kepala tukang 0.600 120,000.00 72,000.00
pekerja 6.000 80,000.00 480,000.00
mandor 0.300 120,000.00 36,000.00
JUMLAH 3,037,500.00
Per m' Pengetesan Pipa PVC dia. 350 mm = 1/400 x Rp. 3,037,500.00 7,593.75

V - 270
400 m' Pengetesan pipa PVC dia. 250 mm

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

ls penyediaan alat bantu dan pek. pengedopan 1.000 157,500.00 157,500.00


ls biaya perpompaan 1.000 105,000.00 105,000.00
m³ penyediaan air bersih 20.000 31,500.00 630,000.00
hr biaya mesin test, BBM, dan servis 5.000 52,500.00 262,500.00
mekanik 2.500 110,000.00 275,000.00
tukang pipa 5.000 110,000.00 550,000.00
kepala tukang 0.500 120,000.00 60,000.00
pekerja 5.000 80,000.00 400,000.00
mandor 0.250 120,000.00 30,000.00
JUMLAH 2,470,000.00
Per m' Pengetesan Pipa PVC dia. 350 mm = 1/400 x Rp. 2,470,000.00 6,175.00

400 m' Pengetesan pipa PVC dia. 200 mm


Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

ls penyediaan alat bantu dan pek. pengedopan 1.000 157,500.00 157,500.00


ls biaya perpompaan 1.000 105,000.00 105,000.00
m³ penyediaan air bersih 13.000 31,500.00 409,500.00
hr biaya mesin test, BBM, dan servis 4.000 52,500.00 210,000.00
mekanik 2.000 110,000.00 220,000.00
tukang pipa 4.000 110,000.00 440,000.00
kepala tukang 0.400 120,000.00 48,000.00
pekerja 4.000 80,000.00 320,000.00
mandor 0.200 120,000.00 24,000.00
JUMLAH 1,934,000.00
Per m' Pengetesan Pipa PVC dia. 350 mm = 1/400 x Rp. 1,934,000.00 4,835.00

400 m' Pengetesan pipa PVC dia. 160 mm


Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

ls penyediaan alat bantu dan pek. pengedopan 1.000 157,500.00 157,500.00


ls biaya perpompaan 1.000 105,000.00 105,000.00
m³ penyediaan air bersih 7.000 31,500.00 220,500.00
hr biaya mesin test, BBM, dan servis 2.500 52,500.00 131,250.00
tukang pipa 3.000 110,000.00 330,000.00
kepala tukang 0.300 120,000.00 36,000.00
pekerja 3.000 80,000.00 240,000.00
mandor 0.150 120,000.00 18,000.00
JUMLAH 1,238,250.00
Per m' Pengetesan Pipa PVC dia. 350 mm = 1/400 x Rp. 1,238,250.00 3,095.63

400 m' Pengetesan pipa PVC dia. 110 mm


Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

ls penyediaan alat bantu dan pek. pengedopan 1.000 186,000.00 186,000.00


ls biaya perpompaan 1.000 126,000.00 126,000.00
m³ penyediaan air bersih 5.000 31,500.00 157,500.00
hr biaya mesin test, BBM, dan servis 2.000 52,500.00 105,000.00
tukang pipa 3.000 110,000.00 330,000.00
kepala tukang 0.300 120,000.00 36,000.00
pekerja 3.000 80,000.00 240,000.00
mandor 0.150 120,000.00 18,000.00
JUMLAH 1,198,500.00
Per m' Pengetesan Pipa PVC dia. 350 mm = 1/400 x Rp. 1,198,500.00 2,996.25

V - 271
400 m' Pengetesan pipa PVC dia. 90 mm
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

ls penyediaan alat bantu dan pek. pengedopan 1.000 186,000.00 186,000.00


ls biaya perpompaan 1.000 126,000.00 126,000.00
m³ penyediaan air bersih 2.500 31,500.00 78,750.00
hr biaya mesin test, BBM, dan servis 2.000 52,500.00 105,000.00
tukang pipa 3.000 110,000.00 330,000.00
kepala tukang 0.300 120,000.00 36,000.00
pekerja 3.000 80,000.00 240,000.00
mandor 0.150 120,000.00 18,000.00
JUMLAH 1,119,750.00
Per m' Pengetesan Pipa PVC dia. 350 mm = 1/400 x Rp. 1,119,750.00 2,799.38

400 m' Pengetesan pipa PVC dia. 63 mm

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

ls penyediaan alat bantu dan pek. pengedopan 1.000 186,000.00 186,000.00


ls biaya perpompaan 1.000 126,000.00 126,000.00
m³ penyediaan air bersih 1.000 31,500.00 31,500.00
hr biaya mesin test, BBM, dan servis 2.000 52,500.00 105,000.00
tukang pipa 3.000 110,000.00 330,000.00
kepala tukang 0.300 120,000.00 36,000.00
pekerja 3.000 80,000.00 240,000.00
mandor 0.150 120,000.00 18,000.00
JUMLAH 1,072,500.00
Per m' Pengetesan Pipa PVC dia. 350 mm = 1/400 x Rp. 1,072,500.00 2,681.25

400 m' Pengetesan pipa PVC dia. 50 mm

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

ls penyediaan alat bantu dan pek. pengedopan 1.000 186,000.00 186,000.00


ls biaya perpompaan 1.000 126,000.00 126,000.00
m³ penyediaan air bersih 0.250 31,500.00 7,875.00
hr biaya mesin test, BBM, dan servis 1.750 52,500.00 91,875.00
tukang pipa 3.000 110,000.00 330,000.00
kepala tukang 0.300 120,000.00 36,000.00
pekerja 3.000 80,000.00 240,000.00
mandor 0.150 120,000.00 18,000.00
JUMLAH 1,035,750.00
Per m' Pengetesan Pipa PVC dia. 350 mm = 1/400 x Rp. 1,035,750.00 2,589.38

1 unit perbaikan gate valve dia. 350mm

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

ls bongkar box street (beton) 1 22,000.00 22,000.00


m³ galian tanah keras / berbatu 3.375 96,416.00 325,404.00
ls perbaikan gate valve dia. 350mm 1 210,000.00 210,000.00
m³ urugan tanah kembali 2.250 52,900.00 119,025.00
m³ pasang box street dia. 160 mm beton tumbuk 1 : 3 : 5 0.075 1,089,200.65 81,690.05
ls perapihan 1 63,000.00 63,000.00
JUMLAH 821,119.05

V - 272
1 unit perbaikan gate valve dia. 300mm

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

ls bongkar box street (beton) 1 22,000.00 22,000.00


m³ galian tanah keras / berbatu 3.375 96,416.00 325,404.00
ls perbaikan gate valve dia. 300mm 1 210,000.00 210,000.00
m³ urugan tanah kembali 2.250 52,900.00 119,025.00
m³ pasang box street dia. 300mm beton tumbuk 1 : 3 : 5 0.075 1,089,200.65 81,690.05
ls perapihan 1 47,250.00 47,250.00
JUMLAH 805,369.05

1 unit perbaikan gate valve dia. 250mm

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

ls bongkar box street (beton) 1 22,000.00 22,000.00


m³ galian tanah keras / berbatu 3.375 96,416.00 325,404.00
ls perbaikan gate valve dia. 250mm 1 210,000.00 210,000.00
m³ urugan tanah kembali 2.250 52,900.00 119,025.00
m³ pasang box street dia. 250mm beton tumbuk 1 : 3 : 5 0.075 1,089,200.65 81,690.05
ls perapihan 1 36,750.00 36,750.00
JUMLAH 794,869.05

1 unit perbaikan gate valve dia. 200mm

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

ls bongkar box street (beton) 1 22,000.00 22,000.00


m³ galian tanah keras / berbatu 3.375 96,416.00 325,404.00
ls perbaikan gate valve dia. 200mm 1 210,000.00 210,000.00
m³ urugan tanah kembali 2.250 52,900.00 119,025.00
m³ pasang box street dia. 200mm beton tumbuk 1 : 3 : 5 0.075 1,089,200.65 81,690.05
ls perapihan 1 21,000.00 21,000.00
JUMLAH 779,119.05

1 unit Perbaikan gate valve dia. 160 mm melalui galian tanah berbatu / bongkar jalan

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah berbatu / bongkar jalan 0.900 126,000.00 113,400.00


m³ Urugan pasir 0.200 336,381.90 67,276.38
m³ Urugan tanah kembali 0.650 52,900.00 34,385.00
m³ Buang tanah sisa galian 0.050 31,740.00 1,587.00
ls Perbaikan gate valve dia. 160 mm 1 152,250.00 152,250.00
ls Bongkar box street 1 22,000.00 22,000.00
unit Pemasangan box street dia. 160 mm 1 110,125.50 110,125.50
ls Perapihan 1 21,000.00 21,000.00
JUMLAH 522,023.88

1 unit Perbaikan gate valve dia. 110 mm melalui galian tanah berbatu / bongkar jalan

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah berbatu / bongkar jalan 0.720 126,000.00 90,720.00


m³ Urugan pasir 0.160 336,381.90 53,821.10
m³ Urugan tanah kembali 0.520 52,900.00 27,508.00
m³ Buang tanah sisa galian 0.040 31,740.00 1,269.60
ls Perbaikan gate valve dia. 110 mm 1 120,750.00 120,750.00
ls Bongkar box street 1 22,000.00 22,000.00
unit Pemasangan box street dia. 110 mm 1 92,780.16 92,780.16
ls Perapihan 1 20,000.00 20,000.00
JUMLAH 428,848.87

V - 273
1 unit Perbaikan gate valve dia. 90 mm melalui galian tanah berbatu / bongkar jalan

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah berbatu / bongkar jalan 0.640 126,000.00 80,640.00


m³ Urugan pasir 0.160 336,381.90 53,821.10
m³ Urugan tanah kembali 0.440 52,900.00 23,276.00
m³ Buang tanah sisa galian 0.040 31,740.00 1,269.60
ls Perbaikan gate valve dia. 90 mm 1 95,000.00 95,000.00
ls Bongkar box street 1 22,000.00 22,000.00
unit Pemasangan box street dia. 90 mm 1 87,266.16 87,266.16
ls Perapihan 1 15,000.00 15,000.00
JUMLAH 378,272.87

1 unit Perbaikan gate valve dia. 63 mm melalui galian tanah berbatu / bongkar jalan

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah berbatu / bongkar jalan 0.360 126,000.00 45,360.00


m³ Urugan pasir 0.120 336,381.90 40,365.83
m³ Urugan tanah kembali 0.210 52,900.00 11,109.00
m³ Buang tanah sisa galian 0.030 31,740.00 952.20
ls Perbaikan gate valve dia. 63 mm 1 95,000.00 95,000.00
ls Bongkar box street 1 22,000.00 22,000.00
unit Pemasangan box street dia. 63 mm 1 63,653.32 63,653.32
ls Perapihan 1 15,000.00 15,000.00
JUMLAH 293,440.35

1 unit Perbaikan gate valve dia. 50 mm melalui galian tanah berbatu / bongkar jalan

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah berbatu / bongkar jalan 0.360 126,000.00 45,360.00


m³ Urugan pasir 0.120 336,381.90 40,365.83
m³ Urugan tanah kembali 0.210 52,900.00 11,109.00
m³ Buang tanah sisa galian 0.030 31,740.00 952.20
ls Perbaikan gate valve dia. 50 mm 1 75,000.00 75,000.00
ls Bongkar box street 1 22,000.00 22,000.00
unit Pemasangan box street dia. 50 mm 1 63,153.32 63,153.32
ls Perapihan 1 15,000.00 15,000.00
JUMLAH 272,940.35

1 unit Perbaikan gate valve dia. 25 mm melalui galian tanah berbatu / bongkar jalan

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah berbatu / bongkar jalan 0.240 126,000.00 30,240.00


m³ Urugan tanah kembali 0.210 52,900.00 11,109.00
m³ Buang tanah sisa galian 0.030 31,740.00 952.20
ls Perbaikan gate valve dia. 25 mm 1 75,000.00 75,000.00
ls Bongkar box street 1 22,000.00 22,000.00
unit Pemasangan box street dia. 25 mm 1 38,123.41 38,123.41
ls Perapihan 1 10,000.00 10,000.00
JUMLAH 187,424.61

V - 274
1 unit Perbaikan gate valve dia. 160 mm melalui galian tanah keras / berbatu

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah keras / berbatu 0.900 126,000.00 113,400.00


m³ Urugan pasir 0.200 336,381.90 67,276.38
m³ Urugan tanah kembali 0.650 52,900.00 34,385.00
m³ Buang tanah sisa galian 0.050 31,740.00 1,587.00
ls Perbaikan gate valve dia. 160 mm 1 145,000.00 145,000.00
ls Bongkar box street 1 22,000.00 22,000.00
unit Pemasangan box street dia. 160 mm 1 110,125.50 110,125.50
ls Perapihan 1 20,000.00 20,000.00
JUMLAH 513,773.88

1 unit Perbaikan gate valve dia. 110 mm melalui galian tanah keras / berbatu

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah keras / berbatu 0.720 126,000.00 90,720.00


m³ Urugan pasir 0.160 336,381.90 53,821.10
m³ Urugan tanah kembali 0.520 52,900.00 27,508.00
m³ Buang tanah sisa galian 0.040 31,740.00 1,269.60
ls Perbaikan gate valve dia. 110 mm 1 115,000.00 115,000.00
ls Bongkar box street 1 22,000.00 22,000.00
unit Pemasangan box street dia. 110 mm 1 92,780.16 92,780.16
ls Perapihan 1 20,000.00 20,000.00
JUMLAH 423,098.87

1 unit Perbaikan gate valve dia. 90 mm melalui galian tanah keras / berbatu

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah keras / berbatu 0.640 126,000.00 80,640.00


m³ Urugan pasir 0.160 336,381.90 53,821.10
m³ Urugan tanah kembali 0.440 52,900.00 23,276.00
m³ Buang tanah sisa galian 0.040 31,740.00 1,269.60
ls Perbaikan gate valve dia. 90 mm 1 95,000.00 95,000.00
ls Bongkar box street 1 22,000.00 22,000.00
unit Pemasangan box street dia. 90 mm 1 87,266.16 87,266.16
ls Perapihan 1 15,000.00 15,000.00
JUMLAH 378,272.87

1 unit Perbaikan gate valve dia. 63 mm melalui galian tanah keras / berbatu

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah keras / berbatu 0.360 126,000.00 45,360.00


m³ Urugan pasir 0.120 336,381.90 40,365.83
m³ Urugan tanah kembali 0.210 52,900.00 11,109.00
m³ Buang tanah sisa galian 0.030 31,740.00 952.20
ls Perbaikan gate valve dia. 63 mm 1 95,000.00 95,000.00
ls Bongkar box street 1 22,000.00 22,000.00
unit Pemasangan box street dia. 63 mm 1 63,653.32 63,653.32
ls Perapihan 1 15,000.00 15,000.00
JUMLAH 293,440.35

V - 275
1 unit Perbaikan gate valve dia. 50 mm melalui galian tanah keras / berbatu

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah keras / berbatu 0.360 126,000.00 45,360.00


m³ Urugan pasir 0.120 336,381.90 40,365.83
m³ Urugan tanah kembali 0.210 52,900.00 11,109.00
m³ Buang tanah sisa galian 0.030 31,740.00 952.20
ls Perbaikan gate valve dia. 50 mm 1 75,000.00 75,000.00
ls Bongkar box street 1 22,000.00 22,000.00
unit Pemasangan box street dia. 50 mm 1 63,153.32 63,153.32
ls Perapihan 1 15,000.00 15,000.00
JUMLAH 272,940.35

1 unit Perbaikan gate valve dia. 25 mm melalui galian tanah keras / berbatu

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah keras / berbatu 0.240 126,000.00 30,240.00


m³ Urugan tanah kembali 0.210 52,900.00 11,109.00
m³ Buang tanah sisa galian 0.030 31,740.00 952.20
ls Perbaikan gate valve dia. 25 mm 1 75,000.00 75,000.00
ls Bongkar box street 1 22,000.00 22,000.00
unit Pemasangan box street dia. 25 mm 1 38,123.41 38,123.41
ls Perapihan 1 10,000.00 10,000.00
JUMLAH 187,424.61

1 unit Perbaikan gate valve dia. 160 mm melalui galian tanah biasa

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah biasa 0.900 72,450.00 65,205.00


m³ Urugan pasir 0.200 336,381.90 67,276.38
m³ Urugan tanah kembali 0.650 52,900.00 34,385.00
m³ Buang tanah sisa galian 0.050 31,740.00 1,587.00
ls Perbaikan gate valve dia. 160 mm 1 145,000.00 145,000.00
ls Bongkar box street 1 22,000.00 22,000.00
unit Pemasangan box street dia. 160 mm 1 110,125.50 110,125.50
ls Perapihan 1 20,000.00 20,000.00
JUMLAH 465,578.88

1 unit Perbaikan gate valve dia. 110 mm melalui galian tanah biasa

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah biasa 0.720 72,450.00 52,164.00


m³ Urugan pasir 0.160 336,381.90 53,821.10
m³ Urugan tanah kembali 0.520 52,900.00 27,508.00
m³ Buang tanah sisa galian 0.040 31,740.00 1,269.60
ls Perbaikan gate valve dia. 110 mm 1 115,000.00 115,000.00
ls Bongkar box street 1 22,000.00 22,000.00
unit Pemasangan box street dia. 110 mm 1 92,780.16 92,780.16
ls Perapihan 1 20,000.00 20,000.00
JUMLAH 384,542.87

V - 276
1 unit Perbaikan gate valve dia. 90 mm melalui galian tanah biasa

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah biasa 0.640 72,450.00 46,368.00


m³ Urugan pasir 0.160 336,381.90 53,821.10
m³ Urugan tanah kembali 0.440 52,900.00 23,276.00
m³ Buang tanah sisa galian 0.040 31,740.00 1,269.60
ls Perbaikan gate valve dia. 90 mm 1 95,000.00 95,000.00
ls Bongkar box street 1 22,000.00 22,000.00
unit Pemasangan box street dia. 90 mm 1 87,266.16 87,266.16
ls Perapihan 1 15,000.00 15,000.00
JUMLAH 344,000.87

1 unit Perbaikan gate valve dia. 63 mm melalui galian tanah biasa

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah biasa 0.360 72,450.00 26,082.00


m³ Urugan pasir 0.120 336,381.90 40,365.83
m³ Urugan tanah kembali 0.210 52,900.00 11,109.00
m³ Buang tanah sisa galian 0.030 31,740.00 952.20
ls Perbaikan gate valve dia. 63 mm 1 95,000.00 95,000.00
ls Bongkar box street 1 22,000.00 22,000.00
unit Pemasangan box street dia. 63 mm 1 63,653.32 63,653.32
ls Perapihan 1 15,000.00 15,000.00
JUMLAH 274,162.35

1 unit Perbaikan gate valve dia. 50 mm melalui galian tanah biasa

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah biasa 0.360 72,450.00 26,082.00


m³ Urugan pasir 0.120 336,381.90 40,365.83
m³ Urugan tanah kembali 0.210 52,900.00 11,109.00
m³ Buang tanah sisa galian 0.030 31,740.00 952.20
ls Perbaikan gate valve dia. 50 mm 1 75,000.00 75,000.00
ls Bongkar box street 1 22,000.00 22,000.00
unit Pemasangan box street dia. 50 mm 1 63,153.32 63,153.32
ls Perapihan 1 15,000.00 15,000.00
JUMLAH 253,662.35

1 unit Perbaikan gate valve dia. 25 mm melalui galian tanah biasa

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah biasa 0.240 72,450.00 17,388.00


m³ Urugan tanah kembali 0.210 52,900.00 11,109.00
m³ Buang tanah sisa galian 0.030 31,740.00 952.20
ls Perbaikan gate valve dia. 25 mm 1 75,000.00 75,000.00
ls Bongkar box street 1 22,000.00 22,000.00
unit Pemasangan box street dia. 25 mm 1 38,123.41 38,123.41
ls Perapihan 1 10,000.00 10,000.00
JUMLAH 174,572.61

V - 277
1 unit pemasangan gate valve dia. 200 mm

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ galian tanah keras / berbatu 3.375 96,416.00 325,404.00


ls pemasangan gate valve dia. 200mm 1 183,750.00 183,750.00
m³ urugan tanah kembali 2.250 52,900.00 119,025.00
unit pasang box street dia. 160 mm beton tumbuk 1 : 3 : 5 1 110,125.50 110,125.50
ls perapihan 1 21,000.00 21,000.00
JUMLAH 759,304.50

1 unit Pemasangan gate valve dia. 250 mm melalui galian tanah berbatu / bongkar jalan

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah berbatu / bongkar jalan 0.900 126,000.00 113,400.00


m³ Urugan pasir 0.200 336,381.90 67,276.38
m³ Urugan tanah kembali 0.650 52,900.00 34,385.00
m³ Buang tanah sisa galian 0.050 31,740.00 1,587.00
ls Pemasangan gate valve dia. 250 mm 1 238,900.00 238,900.00
unit Pemasangan box street dia. 250 mm 1 236,440.65 236,440.65
ls Perapihan 1 2,640.00 2,640.00
JUMLAH 694,629.03

1 unit Pemasangan gate valve dia. 160 mm melalui galian tanah berbatu / bongkar jalan

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah berbatu / bongkar jalan 0.900 126,000.00 113,400.00


m³ Urugan pasir 0.200 336,381.90 67,276.38
m³ Urugan tanah kembali 0.650 52,900.00 34,385.00
m³ Buang tanah sisa galian 0.050 31,740.00 1,587.00
ls Pemasangan gate valve dia. 160 mm 1 152,250.00 152,250.00
unit Pemasangan box street dia. 160 mm 1 110,125.50 110,125.50
ls Perapihan 1 2,640.00 2,640.00
JUMLAH 481,663.88

1 unit Pemasangan gate valve dia. 110 mm melalui galian tanah berbatu / bongkar jalan

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah berbatu / bongkar jalan 0.720 126,000.00 90,720.00


m³ Urugan pasir 0.160 336,381.90 53,821.10
m³ Urugan tanah kembali 0.520 52,900.00 27,508.00
m³ Buang tanah sisa galian 0.040 31,740.00 1,269.60
ls Pemasangan gate valve dia. 110 mm 1 120,750.00 120,750.00
unit Pemasangan box street dia. 110 mm 1 92,780.16 92,780.16
ls Perapihan 1 2,640.00 2,640.00
JUMLAH 389,488.87

1 unit Pemasangan feet kran dia. 90 mm melalui galian tanah berbatu / bongkar jalan

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah berbatu / bongkar jalan 0.640 126,000.00 80,640.00


m³ Urugan pasir 0.160 336,381.90 53,821.10
m³ Urugan tanah kembali 0.440 52,900.00 23,276.00
m³ Buang tanah sisa galian 0.040 31,740.00 1,269.60
ls Pemasangan feet kran dia. 90 mm 1 99,750.00 99,750.00
unit Pemasangan box street dia. 90 mm 1 87,266.16 87,266.16
ls Perapihan 1 2,640.00 2,640.00
JUMLAH 348,662.87

V - 278
1 unit Pemasangan feet kran dia. 63 mm melalui galian tanah berbatu / bongkar jalan

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah berbatu / bongkar jalan 0.360 126,000.00 45,360.00


m³ Urugan pasir 0.120 336,381.90 40,365.83
m³ Urugan tanah kembali 0.210 52,900.00 11,109.00
m³ Buang tanah sisa galian 0.030 31,740.00 952.20
ls Pemasangan feet kran dia. 63 mm 1 95,000.00 95,000.00
unit Pemasangan box street dia. 63 mm 1 63,653.32 63,653.32
ls Perapihan 1 2,640.00 2,640.00
JUMLAH 259,080.35

1 unit Pemasangan feet kran dia. 50 mm melalui galian tanah berbatu / bongkar jalan

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah berbatu / bongkar jalan 0.360 126,000.00 45,360.00


m³ Urugan pasir 0.120 336,381.90 40,365.83
m³ Urugan tanah kembali 0.210 52,900.00 11,109.00
m³ Buang tanah sisa galian 0.030 31,740.00 952.20
ls Pemasangan feet kran dia. 50 mm 1 75,000.00 75,000.00
unit Pemasangan box street dia. 50 mm 1 63,153.32 63,153.32
ls Perapihan 1 2,640.00 2,640.00
JUMLAH 238,580.35

1 unit Pemasangan gate valve dia. 250 mm melalui galian tanah keras / berbatu

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah keras / berbatu 0.900 126,000.00 113,400.00


m³ Urugan pasir 0.200 336,381.90 67,276.38
m³ Urugan tanah kembali 0.650 52,900.00 34,385.00
m³ Buang tanah sisa galian 0 31,740.00 1,587.00
ls Pemasangan gate valve dia. 250 mm 1 238,900.00 238,900.00
unit Pemasangan box street dia. 110 mm 1 57,300.00 57,300.00
ls Perapihan 1 2,640.00 2,640.00
JUMLAH 515,488.38

1 unit Pemasangan gate valve dia. 160 mm melalui galian tanah keras / berbatu

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah keras / berbatu 0.900 126,000.00 113,400.00


m³ Urugan pasir 0.200 336,381.90 67,276.38
m³ Urugan tanah kembali 0.650 52,900.00 34,385.00
m³ Buang tanah sisa galian 0.050 31,740.00 1,587.00
ls Pemasangan gate valve dia. 160 mm 1 152,250.00 152,250.00
unit Pemasangan box street dia. 160 mm 1 110,125.50 110,125.50
ls Perapihan 1 2,640.00 2,640.00
JUMLAH 481,663.88

1 unit Pemasangan gate valve dia. 110 mm melalui galian tanah keras / berbatu

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah keras / berbatu 0.720 126,000.00 90,720.00


m³ Urugan pasir 0.160 336,381.90 53,821.10
m³ Urugan tanah kembali 0.520 52,900.00 27,508.00
m³ Buang tanah sisa galian 0.040 31,740.00 1,269.60
ls Pemasangan gate valve dia. 110 mm 1 120,750.00 120,750.00
unit Pemasangan box street dia. 110 mm 1 92,780.16 92,780.16
ls Perapihan 1 2,640.00 2,640.00

V - 279
JUMLAH 389,488.87

V - 280
1 unit Pemasangan feet kran dia. 90 mm melalui galian tanah keras / berbatu

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah keras / berbatu 0.640 126,000.00 80,640.00


m³ Urugan pasir 0.160 336,381.90 53,821.10
m³ Urugan tanah kembali 0.440 52,900.00 23,276.00
m³ Buang tanah sisa galian 0.040 31,740.00 1,269.60
ls Pemasangan feet kran dia. 90 mm 1 99,750.00 99,750.00
unit Pemasangan box street dia. 90 mm 1 87,266.16 87,266.16
ls Perapihan 1 2,640.00 2,640.00
JUMLAH 348,662.87

1 unit Pemasangan feet kran dia. 63 mm melalui galian tanah keras / berbatu

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah keras / berbatu 0.360 126,000.00 45,360.00


m³ Urugan pasir 0.120 336,381.90 40,365.83
m³ Urugan tanah kembali 0.210 52,900.00 11,109.00
m³ Buang tanah sisa galian 0.030 31,740.00 952.20
ls Pemasangan feet kran dia. 63 mm 1 95,000.00 95,000.00
unit Pemasangan box street dia. 63 mm 1 63,653.32 63,653.32
ls Perapihan 1 2,640.00 2,640.00
JUMLAH 259,080.35

1 unit Pemasangan feet kran dia. 50 mm melalui galian tanah keras / berbatu

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah keras / berbatu 0.360 126,000.00 45,360.00


m³ Urugan pasir 0.120 336,381.90 40,365.83
m³ Urugan tanah kembali 0.210 52,900.00 11,109.00
m³ Buang tanah sisa galian 0.030 31,740.00 952.20
ls Pemasangan feet kran dia. 50 mm 1 75,000.00 75,000.00
unit Pemasangan box street dia. 50 mm 1 63,153.32 63,153.32
ls Perapihan 1 2,640.00 2,640.00
JUMLAH 238,580.35

1 unit Pemasangan feet kran dia. 25 mm melalui galian tanah keras / berbatu

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah keras / berbatu 0.240 126,000.00 30,240.00


m³ Urugan tanah kembali 0.210 52,900.00 11,109.00
m³ Buang tanah sisa galian 0.030 31,740.00 952.20
ls Pemasangan feet kran dia. 25 mm 1 75,000.00 75,000.00
unit Pemasangan box street dia. 25 mm 1 38,123.41 38,123.41
ls Perapihan 1 2,640.00 2,640.00
JUMLAH 158,064.61

1 unit Pemasangan gate valve dia. 160 mm melalui galian tanah biasa

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah biasa 0.900 72,450.00 65,205.00


m³ Urugan pasir 0.200 336,381.90 67,276.38
m³ Urugan tanah kembali 0.650 52,900.00 34,385.00
m³ Buang tanah sisa galian 0.050 31,740.00 1,587.00
ls Pemasangan gate valve dia. 160 mm 1 152,250.00 152,250.00
unit Pemasangan box street dia. 160 mm 1 110,125.50 110,125.50
ls Perapihan 1 2,500.00 2,500.00
JUMLAH 433,328.88

V - 281
1 unit Pemasangan gate valve dia. 110 mm melalui galian tanah biasa

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah biasa 0.720 72,450.00 52,164.00


m³ Urugan pasir 0.160 336,381.90 53,821.10
m³ Urugan tanah kembali 0.520 52,900.00 27,508.00
m³ Buang tanah sisa galian 0.040 31,740.00 1,269.60
ls Pemasangan gate valve dia. 110 mm 1 120,750.00 120,750.00
unit Pemasangan box street dia. 110 mm 1 92,780.16 92,780.16
ls Perapihan 1 2,500.00 2,500.00
JUMLAH 350,792.87

1 unit Pemasangan feet kran dia. 90 mm melalui galian tanah biasa


Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah biasa 0.640 72,450.00 46,368.00


m³ Urugan pasir 0.160 336,381.90 53,821.10
m³ Urugan tanah kembali 0.440 52,900.00 23,276.00
m³ Buang tanah sisa galian 0.040 31,740.00 1,269.60
ls Pemasangan feet kran dia. 90 mm 1 99,750.00 99,750.00
unit Pemasangan box street dia. 90 mm 1 87,266.16 87,266.16
ls Perapihan 1 2,500.00 2,500.00
JUMLAH 314,250.87

1 unit Pemasangan feet kran dia. 63 mm melalui galian tanah biasa


Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah biasa 0.360 72,450.00 26,082.00


m³ Urugan pasir 0.120 336,381.90 40,365.83
m³ Urugan tanah kembali 0.210 52,900.00 11,109.00
m³ Buang tanah sisa galian 0.030 31,740.00 952.20
ls Pemasangan feet kran dia. 63 mm 1 95,000.00 95,000.00
unit Pemasangan box street dia. 63 mm 1 63,653.32 63,653.32
ls Perapihan 1 2,500.00 2,500.00
JUMLAH 239,662.35

1 unit Pemasangan feet kran dia. 50 mm melalui galian tanah biasa


Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah biasa 0.360 72,450.00 26,082.00


m³ Urugan pasir 0.120 336,381.90 40,365.83
m³ Urugan tanah kembali 0.210 52,900.00 11,109.00
m³ Buang tanah sisa galian 0.030 31,740.00 952.20
ls Pemasangan feet kran dia. 50 mm 1 75,000.00 75,000.00
unit Pemasangan box street dia. 50 mm 1 63,153.32 63,153.32
ls Perapihan 1 2,500.00 2,500.00
JUMLAH 219,162.35

1 unit Pemasangan feet kran dia. 25 mm melalui galian tanah biasa


Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah biasa 0.240 72,450.00 17,388.00


m³ Urugan tanah kembali 0.210 52,900.00 11,109.00
m³ Buang tanah sisa galian 0.030 31,740.00 952.20
ls Pemasangan feet kran dia. 25 mm 1 75,000.00 75,000.00
unit Pemasangan box street dia. 25 mm 1 38,123.41 38,123.41
ls Perapihan 1 2,500.00 2,500.00
JUMLAH 145,072.61

V - 282
1 unit Pemasangan Box Street dia. 8"
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

bh Pemasangan Box Street dia. 8" 1.000 5,500.00 5,500.00


m' Pemasangan pipa dia. 8" 1.000 200,443.03 200,443.03
m³ Beton tumbuk 1:3:5 0.028 1,089,200.65 30,497.62
JUMLAH 236,440.65

1 unit Pemasangan Box Street dia. 6"

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

bh Pemasangan Box Street dia. 6" 1.000 5,500.00 5,500.00


m' Pemasangan pipa dia. 6" 1.000 89,376.69 89,376.69
m³ Beton tumbuk 1:3:5 0.014 1,089,200.65 15,248.81
JUMLAH 110,125.50

1 unit Pemasangan Box Street dia. 4"

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

bh Pemasangan Box Street dia. 4" 1.000 5,500.00 5,500.00


m' Pemasangan pipa dia. 4" 1.000 72,031.35 72,031.35
m³ Beton tumbuk 1:3:5 0.014 1,089,200.65 15,248.81
JUMLAH 92,780.16

1 unit Pemasangan Box Street dia. 3"

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

bh Pemasangan Box Street dia. 3" 1.000 5,500.00 5,500.00


m' Pemasangan pipa dia. 3" 1.000 66,517.35 66,517.35
m³ Beton tumbuk 1:3:5 0.014 1,089,200.65 15,248.81
JUMLAH 87,266.16

1 unit Pemasangan Box Street dia. 2"

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

bh Pemasangan Box Street dia. 2" 1.000 5,500.00 5,500.00


m' Pemasangan pipa dia. 2" 1.000 42,904.51 42,904.51
m³ Beton tumbuk 1:3:5 0.014 1,089,200.65 15,248.81
JUMLAH 63,653.32

1 unit Pemasangan Box Street dia. 1 1/2"

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

bh Pemasangan Box Street dia. 1 1/2" 1.000 5,500.00 5,500.00


m' Pemasangan pipa dia. 1 1/2" 1.000 42,404.51 42,404.51
m³ Beton tumbuk 1:3:5 0.014 1,089,200.65 15,248.81
JUMLAH 63,153.32

1 unit Pemasangan Box Street dia. 1"

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

bh Pemasangan Box Street dia. 1" 1.000 5,500.00 5,500.00


m' Pemasangan pipa dia. 1" 1.000 17,374.60 17,374.60
m³ Beton tumbuk 1:3:5 0.014 1,089,200.65 15,248.81

V - 283
JUMLAH 38,123.41

V - 284
1 unit Peninggian Box Street

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ beton tumbuk 1 : 3 : 5 0.024 1,089,200.65 26,140.82


tukang 1.000 110,000.00 110,000.00
JUMLAH 136,140.82

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 ls Bongkar Box Street 22,000.00
1 ls Pemasangan / Perbaikan Accessories
Accessories dia. 3/4" 75,000.00
Accessories dia. 1" 75,000.00
Accessories dia. 1 1/2" 75,000.00
Accessories dia. 2" 95,000.00
Accessories dia. 3" 99,750.00
Accessories dia. 4" 120,750.00
Accessories dia. 6" 152,250.00
Accessories dia. 8" 183,750.00
Accessories dia. 10" 238,900.00
Accessories dia. 12" 310,500.00
Accessories dia. 14" 403,600.00
1 m³ Perbaikan Aspal Hotmix 1,260,000.00

1 unit Pemasangan wash out dia. 160 mm

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah keras / berbatu 1.800 96,416.00 173,548.80


m³ Urugan pasir 0.400 336,381.90 134,552.76
m³ Urugan tanah kembali 1.300 52,900.00 68,770.00
m³ Buang tanah sisa galian 0.100 31,740.00 3,174.00
m' Pemasangan pipa PVC dia. 160 mm 4 3,500.00 14,000.00
ls Pemasangan gate valve dia. 160 mm 1 152,250.00 152,250.00
unit Pemasangan box street dia. 160 mm 1 110,125.50 110,125.50
ls Perapihan 1 5,040.00 5,040.00
JUMLAH 661,461.06

1 unit Pemasangan wash out dia. 110 mm

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah keras / berbatu 1.440 96,416.00 138,839.04


m³ Urugan pasir 0.320 336,381.90 107,642.21
m³ Urugan tanah kembali 1.040 52,900.00 55,016.00
m³ Buang tanah sisa galian 0.080 31,740.00 2,539.20
m' Pemasangan pipa PVC dia. 110 mm 4 3,000.00 12,000.00
ls Pemasangan gate valve dia. 110 mm 1 120,750.00 120,750.00
unit Pemasangan box street dia. 110 mm 1 92,780.16 92,780.16
ls Perapihan 1 5,040.00 5,040.00
JUMLAH 534,606.61

V - 285
1 unit Pemasangan wash out dia. 90 mm

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah keras / berbatu 1.280 96,416.00 123,412.48


m³ Urugan pasir 0.320 336,381.90 107,642.21
m³ Urugan tanah kembali 0.880 52,900.00 46,552.00
m³ Buang tanah sisa galian 0.080 31,740.00 2,539.20
m' Pemasangan pipa PVC dia. 90 mm 4 2,500.00 10,000.00
ls Pemasangan gate valve dia. 90 mm 1 99,750.00 99,750.00
unit Pemasangan box street dia. 90 mm 1 87,266.16 87,266.16
ls Perapihan 1 5,040.00 5,040.00
JUMLAH 482,202.05

1 unit Pemasangan wash out dia. 63 mm

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah keras / berbatu 0.720 96,416.00 69,419.52


m³ Urugan pasir 0.240 336,381.90 80,731.66
m³ Urugan tanah kembali 0.420 52,900.00 22,218.00
m³ Buang tanah sisa galian 0.060 31,740.00 1,904.40
m' Pemasangan pipa PVC dia. 63 mm 4 2,000.00 8,000.00
ls Pemasangan gate valve dia. 63 mm 1 95,000.00 95,000.00
unit Pemasangan box street dia. 63 mm 1 63,653.32 63,653.32
ls Perapihan 1 5,040.00 5,040.00
JUMLAH 345,966.90

1 unit Pemasangan wash out dia. 50 mm

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah keras / berbatu 0.720 96,416.00 69,419.52


m³ Urugan pasir 0.240 336,381.90 80,731.66
m³ Urugan tanah kembali 0.420 52,900.00 22,218.00
m³ Buang tanah sisa galian 0.060 31,740.00 1,904.40
m' Pemasangan pipa PVC dia. 50 mm 4 1,500.00 6,000.00
ls Pemasangan gate valve dia. 50mm 1 75,000.00 75,000.00
unit Pemasangan box street dia. 50 mm 1 63,153.32 63,153.32
ls Perapihan 1 5,040.00 5,040.00
JUMLAH 323,466.90

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 unit Crossing Jalan Sistim Boring
m' pekerjaan boring tanah pipa dia. 2" 1 165,700.00
m' pekerjaan boring tanah pipa dia. 3" 1 185,100.00
m' pekerjaan boring tanah pipa dia. 4" 1 283,800.00
m' pekerjaan boring tanah pipa dia. 6" 1 335,200.00
m' pekerjaan boring tanah pipa dia. 8" 1 418,600.00
m' pekerjaan boring tanah pipa dia. 10" 1 598,300.00
m' pekerjaan boring tanah pipa dia. 12" 1 598,300.00
m' pekerjaan boring tanah pipa dia. 14" 1 672,500.00
m' pekerjaan boring tanah pipa dia. 16" 1 700,000.00

V - 286
Pemasangan Pipa Sistim Boring
18 m' Pemasangan Pipa PVC dia. 2" Sistim Boring Horizontal

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah keras / berbatu 1.080 96,416.00 104,129.28


m³ Urugan tanah kembali 0.630 52,900.00 33,327.00
m³ Buang tanah sisa galian 0.090 31,740.00 2,856.60
m' Pengeboran tanah dia. 3" 18 185,100.00 3,331,800.00
ls Pemasangan pipa dia. 2" 18 47,218.39 849,931.09
ls Pemadatan dan Perapihan kembali 1 7,600.00 7,600.00
JUMLAH 4,329,643.97
Per m' Pemasangan Pipa PVC dia. 2" Sistem Boring = 1/18 x Rp. 240,535.78

18 m' Pemasangan Pipa PVC dia. 3" Sistim Boring Horizontal

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah keras / berbatu 1.920 96,416.00 185,118.72


m³ Urugan tanah kembali 1.320 52,900.00 69,828.00
m³ Buang tanah sisa galian 0.120 31,740.00 3,808.80
m' Pengeboran tanah dia. 4" 18 283,800.00 5,108,400.00
ls Pemasangan pipa dia. 3" 18 74,186.47 1,335,356.50
ls Pemadatan dan Perapihan kembali 1 7,600.00 7,600.00
JUMLAH 6,710,112.02
Per m' Pemasangan Pipa PVC dia. 3" Sistem Boring = 1/18 x Rp. 372,784.00

18 m' Pemasangan Pipa PVC dia. 4" Sistim Boring Horizontal

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah keras / berbatu 2.160 96,416.00 208,258.56


m³ Urugan tanah kembali 1.560 52,900.00 82,524.00
m³ Buang tanah sisa galian 0.120 31,740.00 3,808.80
m' Pengeboran tanah dia. 6" 18 335,200.00 6,033,600.00
ls Pemasangan pipa dia. 4" 18 80,659.11 1,451,864.02
ls Pemadatan dan Perapihan kembali 1 7,600.00 7,600.00
JUMLAH 7,787,655.38
Per m' Pemasangan Pipa PVC dia. 4" Sistem Boring = 1/18 x Rp. 432,647.52

18 m' Pemasangan Pipa PVC dia. 6" Sistim Boring Horizontal

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah keras / berbatu 2.700 96,416.00 260,323.20


m³ Urugan tanah kembali 1.950 52,900.00 103,155.00
m³ Buang tanah sisa galian 0.150 31,740.00 4,761.00
m' Pengeboran tanah dia. 8" 18 418,600.00 7,534,800.00
ls Pemasangan pipa dia. 6" 18 100,161.39 1,802,905.02
ls Pemadatan dan Perapihan kembali 1 7,600.00 7,600.00
JUMLAH 9,713,544.22
Per m' Pemasangan Pipa PVC dia. 6" Sistem Boring = 1/18 x Rp. 539,641.35

V - 287
18 m' Pemasangan Pipa PVC dia. 8" Sistim Boring Horizontal

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah keras / berbatu 3.600 96,416.00 347,097.60


m³ Urugan tanah kembali 2.700 52,900.00 142,830.00
m³ Buang tanah sisa galian 0.180 31,740.00 5,713.20
m' Pengeboran tanah dia. 10" 18 598,300.00 10,769,400.00
ls Pemasangan pipa dia. 8" 18 128,622.63 2,315,207.30
ls Pemadatan dan Perapihan kembali 1 7,600.00 7,600.00
JUMLAH 13,587,848.10
Per m' Pemasangan Pipa PVC dia. 8" Sistem Boring = 1/18 x Rp. 754,880.45

18 m' Pemasangan Pipa PVC dia. 10" Sistim Boring Horizontal

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah keras / berbatu 4.290 96,416.00 413,624.64


m³ Urugan tanah kembali 2.925 52,900.00 154,732.50
m³ Buang tanah sisa galian 0.195 31,740.00 6,189.30
m' Pengeboran tanah dia. 12" 18 598,300.00 10,769,400.00
ls Pemasangan pipa dia. 10" 18 167,502.21 3,015,039.79
ls Pemadatan dan Perapihan kembali 1 7,600.00 7,600.00
JUMLAH 14,366,586.23
Per m' Pemasangan Pipa PVC dia. 10" Sistem Boring = 1/18 x Rp. 798,143.68

18 m' Pemasangan Pipa PVC dia. 12" Sistim Boring Horizontal

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah keras / berbatu 4.950 96,416.00 477,259.20


m³ Urugan tanah kembali 3.375 52,900.00 178,537.50
m³ Buang tanah sisa galian 0.225 31,740.00 7,141.50
m' Pengeboran tanah dia. 14" 18 672,500.00 12,105,000.00
ls Pemasangan pipa dia. 12" 18 192,825.63 3,470,861.30
ls Pemadatan dan Perapihan kembali 1 7,600.00 7,600.00
JUMLAH 16,246,399.50
Per m' Pemasangan Pipa PVC dia. 12" Sistem Boring = 1/18 x Rp. 902,577.75

18 m' Pemasangan Pipa PVC dia. 14" Sistim Boring Horizontal

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah keras / berbatu 5.280 96,416.00 509,076.48


m³ Urugan tanah kembali 3.600 52,900.00 190,440.00
m³ Buang tanah sisa galian 0.240 31,740.00 7,617.60
m' Pengeboran tanah dia. 16" 18 700,000.00 12,600,000.00
ls Pemasangan pipa dia. 14" 18 205,737.34 3,703,272.05
ls Pemadatan dan Perapihan kembali 1 7,600.00 7,600.00
JUMLAH 17,018,006.13
Per m' Pemasangan Pipa PVC dia. 14" Sistem Boring = 1/18 x Rp. 945,444.78

1 m' Pemasangan pipa GI dia. 200 mm melalui galian type FR/CR

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah keras / berbatu 0.495 96,416.00 47,725.92


m³ Urugan pasir 0.155 336,381.90 52,139.19
m³ Urugan tanah kembali 0.315 52,900.00 16,663.50
m³ Buang tanah sisa galian 0.180 31,740.00 5,713.20
m' Pemasangan pipa GI dia. 200 mm & Acc. 1 20,000.00 20,000.00
ls Perapihan 1 2,200.00 2,200.00
JUMLAH 144,441.81

V - 288
1 m' Pemasangan pipa GI dia. 200 mm melalui galian type FR/CR

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah keras / berbatu 0.495 96,416.00 47,725.92


m³ Urugan pasir 0.155 336,381.90 52,139.19
m³ Urugan tanah kembali 0.315 52,900.00 16,663.50
m³ Buang tanah sisa galian 0.180 31,740.00 5,713.20
m' Pemasangan pipa GI dia. 200 mm & Acc. 1 18,200.00 18,200.00
ls Perapihan 1 2,200.00 2,200.00
JUMLAH 142,641.81

1 unit Tiang Penyangga

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m' Pipa GI dia. 90 mm 2 129,350.00 258,700.00


m' Pengelasan 0.560 50,098.89 28,055.38
bh mur baud uk. 5/8" 2 1,600.00 3,200.00
bh cleam pipa 1 7,000.00 7,000.00
ls pemasangan 1 195,400.00 195,400.00
JUMLAH 492,355.38

Sumber, 2020

Kepala Dinas Perumahan, Kawasan Permukiman Dan


Pertanahan Kabupaten Cirebon

H. SUKMA NUGRAHA, SH.,MM.


NIP. 19610301 198603 1 012

V - 289
DAFTAR HARGA SATUAN BAHAN, UPAH DAN ALAT
DINAS PERUMAHAN KAWASAN PERMUKIMAN DAN PERTANAHAN
KABUPATEN CIREBON
TAHUN ANGGARAN 2020

HARGA SATUAN
NO URAIAN BAHAN/UPAH/ALAT KODE SAT. KET.
Rp
A. BAHAN :

I. BATU
1 Abu Batu m3 345,000.00
2 Atras ( tanah urug ) m3 143,750.00
3 Batu apung kg 4,945.00
4 Batu belah 10/15 cm m3 345,000.00
5 Batu belah 15/20 cm (Krakal) m3 258,750.00
6 Batu pecah mesin 0.5-1 cm m3 287,500.00
7 Batu pecah mesin 1-2 cm m3 345,000.00
8 Batu pecah mesin 2-3 cm m3 345,000.00
9 Batu pecah mesin 3-5 cm m3 345,000.00
10 Batu tempel Palimanan 10 X 20 bh 3,220.00
11 Batu tempel kapur tekstur tidak rata m2 299,000.00
12 Chipping m3 310,500.00
13 Filler m3 218,500.00
14 Kapur bakar (padam) m3 253,000.00
15 Kapur Sirih kg 2,300.00
16 Kerikil Ø 1-3 cm m3 230,000.00
17 Gravel Pack (pelabuhan ratu/sukabumi) m3 1,380,000.00
Kansteen 10 x 20 x 40 bh 15,325.00

II. PASIR
1 Pasir beton m3 244,375.00
2 Pasir aspal m3 244,375.00
3 Pasir pasang m3 222,812.50
4 Pasir urug m3 222,755.00
5 Sirtu m3 201,250.00
6 Sirtu tersaring m3 301,875.00
7 Tanah urug pilhan m3 172,500.00
8 Tanah urug biasa m3 172,500.00
9 Tanah merah m3 172,500.00

III. BESI / PIPA / KAWAT


1 Besi WF/Besi Profil kg 16,100.00
2 Besi strip kg 15,812.50
3 Besi beton kg 14,950.00
4 Besi Wire Mesh M8 Lembar 652,050.00
5 Besi stainless dia. 0,5" m' 43,700.00
6 Besi stainless dia. 1" m' 69,000.00
7 Besi stainless dia. 1,5" m' 86,250.00
8 Besi stainless dia. 2" m' 92,000.00
9 Besi stainless dia. 2,5" m' 143,750.00
10 Besi stainless dia. 3" m' 174,800.00
11 Besi biasa dia. 2" btg 287,500.00
12 Besi biasa dia. 3" btg 356,500.00
13 Kawat beton / Kawat tali kg 40,250.00
14 Kawat bronjong pabrikan dia. 3 mm (uk 2x1x0.5) unit 529,920.00
15 Kawat bronjong dia. 4 mm kg 40,250.00
16 Kawat galvanis dia. 4 mm kg 23,000.00
17 Kawat galvanis dia. 6 mm kg 27,600.00
18 Kawat duri m' 16,905.00
19 Pipa Reducer PVC Ø 3"-4" SNI bh 6,900.00
20 Pipa Knee/bend PVC Ø 1/2" SNI bh 2,415.00
21 Pipa Knee/bend PVC Ø 3/4" SNI bh 2,932.50
22 Pipa Knee/bend PVC Ø 1" SNI bh 4,370.00
23 Pipa Knee/bend PVC Ø 1 1/2" SNI bh 9,430.00
24 Pipa Knee/bend PVC Ø 2" SNI bh 24,610.00
25 Pipa Knee/bend PVC Ø 3" SNI bh 6,900.00
26 Pipa Knee/bend PVC Ø 4" SNI bh 147,315.00
27 Pipa Knee/bend PVC Ø 6" SNI bh 602,255.00

VI - 290
HARGA SATUAN
NO URAIAN BAHAN/UPAH/ALAT KODE SAT. KET.
Rp
28 Plat baja tebal 5 mm - 20 mm kg 14,950.00
29 Ram kawat harmonika m2 51,750.00
30 Socket besi O 3 " bh 51,750.00
31 Sling Ø 32 mm m 350,750.00
32 Sling Ø 16 mm m 258,750.00

VI - 291
HARGA SATUAN
NO URAIAN BAHAN/UPAH/ALAT KODE SAT. KET.
Rp
33 Klem sling Ø 32 mm set 517,500.00
34 Warfel / jarum keras Ø 32 mm bh 230,000.00
35 Causen sling Ø 32 mm bh 224,250.00
36 Klem kokat sling Ø 32 mm bh 287,500.00
37 Segel sling Ø 32 mm bh 287,500.00
38 Warfel sling Ø 16 mm bh 189,750.00
39 Segel sling Ø 16 mm bh 161,000.00
40 Klem kokat sling Ø 16 mm bh 103,500.00
41 Causen sling Ø 16 mm bh 166,750.00
42 Jarum keras Ø 16 mm bh 189,750.00

IV. PABRIKAN / TOKO


1 Alumunium foil m2 10,350.00
2 Alumunium pelapis pintu KM Tebal 0.2 lbr 40,250.00
3 Alumunium pelapis pintu KM Tebal 0.3 lbr 57,500.00
4 Alumunium pelapis pintu KM Tebal 0.4 lbr 80,500.00
5 Asbes gelombang 1500 x 1050 x 4 mm lbr 48,875.00
6 Asbes gelombang 1800 x 920 x 4 mm lbr 36,800.00
7 Asbes gelombang 2100 x 1050 x 4 mm lbr 65,550.00
8 Asbes gelombang 2400 x 1050 x 4 mm lbr 74,750.00
9 Asbes gelombang 2700 x 1050 x 4 mm lbr 86,250.00
10 Asbes gelombang 3000 x 1050 x 4 mm lbr 97,750.00
11 Ampelas lbr 3,450.00
12 Bak mandi keramik volume 0,3 m3 bh 212,750.00
13 Bak mandi fiber 120 L bh 253,000.00
14 Batu apung kg 4,945.00
15 Baut 3/4 " bh 7,705.00
16 Baut 5/8 " bh 7,705.00
17 Baut 1/2 " bh 6,900.00
18 Baut 1/2 " panjang 30 cm bh 23,000.00
19 Baut lawa-lawa 12 cm bh 17,250.00
20 Beading penurunan ( PC ) gypsum m' 11,500.00
21 Beading horison gypsum m' 11,500.00
22 Cat Menie kg 50,600.00
23 Cat genteng Matex kg 55,200.00
24 Cat genteng maxilite kg 57,500.00
25 Cat penutup kayu Bee brand kg 56,350.00
26 Cat penutup kayu Vim kg 28,750.00
27 Cat penutup kayu Ftalit kg 52,900.00
28 Cat penutup kayu Avian kg 55,200.00
29 Cat penutup tembok Vinilex kg 28,750.00
30 Cat penutup tembok Metrolit kg 26,450.00
31 Cat penutup tembok catylac kg 21,390.00
32 Cat penutup tembok Q Luc kg 11,500.00
33 Cat penutup tembok Property kg 10,925.00
34 Cat penutup besi kg 63,250.00
35 Cat Sinkromat kg 103,500.00
36 Closet duduk ( mono block ) porselen merk INA bh 1,422,550.00
37 Closet duduk ( siram ) porselen merk INA bh 626,750.00
38 Closet jongkok porselen merk INA/KIA bh 161,000.00
39 Closet jongkok porselen merk Avena bh 115,000.00
40 Dempul kayu kg 21,275.00
41 Dinding keramik uk. 10 x 20 cm bh 1,150.00
42 Dinding keramik uk. 20 x 20 cm bh 2,300.00
43 Dinding keramik uk. 20 x 25 cm bh 2,530.00
44 Dinding keramik uk. 30 x 30 cm bh 5,175.00
45 Door closer bh 190,095.00
46 Daun Jendela alumunium 4 '' m' 157,377.50
47 Jendela Alumunium + Kaca (uk.120 cm x 60 cm) warna silver unit 822,250.00
48 Jendela Alumunium + Kaca (uk.120 cm x 60 cm) warna Black/Brown unit 885,500.00
49 Jendela Alumunium + Kaca (uk.120 cm x 60 cm) warna White unit 948,750.00
50 Pintu Allumunium + Kaca (uk.210 cm x 90 cm) warna silver unit 1,391,500.00
51 Pintu Allumunium + Kaca (uk.210 cm x 90 cm) warna Black/Brown unit 1,518,000.00
52 Pintu Allumunium + Kaca (uk.210 cm x 90 cm) warna White unit 1,644,500.00
53 Pintu Kamar Mandi (Spandrel) uk. 200 cm x 70 cm warna silver unit 1,138,500.00
54 Pintu Kamar Mandi (Spandrel) uk. 200 cm x 70 cm warna Black/Brown unit 1,265,000.00
55 Pintu Kamar Mandi (Spandrel) uk. 200 cm x 70 cm warna White unit 1,391,500.00
56 Elastomer 30x30x5 bh 345,000.00
57 Elastomer 50x40x5 bh 3,450,000.00
58 Engsel jendela set 13,800.00
59 Engsel pintu set 69,000.00
60 Engsel meubeler bh 4,370.00
61 Eternit tebal 4 mm uk. 1 m x 1 m lbr 7,935.00
62 Eternit tebal 4 mm uk. 1 m x 0,5 m lbr 3,967.50
63 Flincote ltr 25,300.00

VI - 292
HARGA SATUAN
NO URAIAN BAHAN/UPAH/ALAT KODE SAT. KET.
Rp
64 Loster Jati bh 28,750.00
65 Glass beat kg 28,750.00
66 Glass Block bh 20,125.00
67 Gas elpiji kg 21,850.00
68 Grendel pintu / jendela bh 6,325.00

VI - 293
HARGA SATUAN
NO URAIAN BAHAN/UPAH/ALAT KODE SAT. KET.
Rp
69 Gypsum board lbr 60,375.00
70 GRC tebal 4 mm lbr 78,200.00
71 Fiber Gelombang 180 x80 lbr 46,000.00
72 Kaca nako tebal 5 mm berikut teralis bh 13,110.00
73 Kaca polos tebal 3 mm m2 72,737.50
74 Kaca polos tebal 5 mm m2 86,250.00
75 Kaca polos tebal 5 mm ryben m2 92,000.00
76 Kait angin bh 8,625.00
77 Kran air Onda bh 13,800.00
78 Kunci gembok bh 28,750.00
79 Kunci pintu ukuran besar bh 143,750.00
80 Kunci pintu ukuran sedang bh 97,750.00
81 Kunci dan daun pintu dari fiber bh 402,500.00
82 Kusen Alumunium 3" warna natural/silver m' 75,900.00
83 Kusen Alumunium 3" warna coklat dop m' 82,225.00
84 Kusen Alumunium 3" warna coklat kilap m' 94,875.00
85 Kusen Alumunium 4" warna natural m' 94,875.00
86 Kusen Alumunium 4" warna coklat dop m' 101,200.00
87 Kusen Alumunium 4" warna coklat kilap m' 113,850.00
88 Kusen Alumunium 3" YKK m' 115,000.00
89 Kusen Alumunium 4" YKK m' 1,495,000.00
90 Langko - langko kuda - kuda bh 20,700.00
91 Lantai granit 60 x 60 cm ex. Granito corak bh 66,930.00
92 Lantai granit 60 x 60 cm ex. Granito polos bh 66,240.00
93 Lantai granit 40 x 40 cm ex. Essenza bh 66,125.00
94 Lantai granit 40 x 40 cm ex. Granito bh 64,630.00
95 Lantai granit 60 x 60 cm ex. Granito bh 66,585.00
96 Lantai keramik uk. 10 x 20 cm bh 5,750.00
97 Lantai keramik uk. 20 x 20 cm bh 7,475.00
98 Lantai keramik uk. 30 x 30 cm bh 4,830.00
99 Lantai keramik uk. 40 x 40 cm ( putih polos ) bh 12,650.00
100 Lantai terakota 20 x 5 cm bh 11,500.00
101 Lem kayu ltr 34,500.00
102 Lemkra/zat addictive kg 17,250.00
103 Lemkra Just Do It kg 5,175.00
104 Lemkra FS Nat kg 18,227.50
105 List kayu B.3 ( lebar sisi 3 cm ) m' 5,060.00
106 List kayu B.4 ( lebar sisi 4 cm ) m' 5,520.00
107 List keliling gypsum lebar 7 cm m' 16,100.00
108 List keliling gypsum lebar 10 cm m' 18,400.00
109 List keliling gypsum lebar 12 cm m' 20,700.00
110 List drop m' 10,235.00
111 Melamin / folywood lbr 101,775.00
112 Mozaik uk. 20 x 20 cm bh 2,185.00
113 Multiplex tebal 12 mm lbr 230,000.00
114 Multiplex tebal 15 mm lbr 316,250.00
115 Paku biasa 1/2" - 1" kg 23,000.00
116 Paku biasa 2" - 5" kg 23,000.00
117 Paku pancing 60 x 230 bh 977.50
118 Paku sekrup 3" - 5 " bh 460.00
119 Paku ulir bh 172.50
120 Plamir kayu / kualitas 1 kg 23,000.00
121 Plamir tembok kg 80,500.00
122 Plester Mutiara kg 9,200.00
123 Pintu kamer mandi fiber polos Daimaru bh 201,250.00
124 Pintu kamer mandi fiber Kaca Daimaru bh 281,750.00
125 Pintu kamer mandi Almunium Kettler bh 805,000.00
126 Polycarbonate m2 132,250.00
127 Plywood lbr 106,087.50
128 Portland Cement ( PC ) tiga roda zak 81,650.00
129 Portland Cement ( PC ) holcim zak 78,200.00
130 Portland Cement ( PC ) gresik zak 78,200.00
131 Rubber joint 25x10x5 bh 287,500.00
132 Joint Sealent kg 48,300.00
133 Expansion Cap m2 8,740.00
134 Polytene 125 mikron kg 31,625.00
135 Curing Compound Ltr 14,375.00
136 Roster / batu kerawang bh 4,600.00
137 Portland Semen kg 1,633.00
138 Semen warna kg 6,900.00
139 Seng BJLS 30 L. 90 cm m' 43,700.00
140 Seng gelombang 3' - 6 " BJLS 30 lbr 92,000.00
141 Sirlak kg 22,425.00
142 Spirtus ltr 10,350.00
143 Skim Coat kg 5,060.00

VI - 294
HARGA SATUAN
NO URAIAN BAHAN/UPAH/ALAT KODE SAT. KET.
Rp
144 Taekwood 4 mm 1200 x 2400 mm lbr 92,000.00
145 Taekwood 4 mm 900 x 2400 mm lbr 74,750.00
146 Ter kayu kg 16,675.00
147 Thermoplastic Glass beat kg 28,750.00
148 Tiner / minyak cat ltr 13,225.00

VI - 295
HARGA SATUAN
NO URAIAN BAHAN/UPAH/ALAT KODE SAT. KET.
Rp
149 Triplek 3 mm lbr 64,400.00
150 Triplek 4 mm lbr 96,600.00
151 Triplek 6 mm lbr 146,050.00
152 Triplek 9 mm lbr 163,300.00
153 Triplek 12 mm lbr 188,600.00
154 Tempat cuci piring Beleza bh 460,000.00
155 Tempat cuci piring Benoti bh 201,250.00
156 Tempat cuci piring Royal bh 184,000.00
157 TG 302 kg 50,140.00
158 Washtafel bh 788,900.00
159 Woodplank corak 4 m lbr 69,000.00
160 Woodplank polos 2 m lbr 37,375.00
161 Ubin abu2 kepala basah 20 x 20 cm bh 2,300.00
162 Ubin abu2 kepala basah 30 x 30 cm bh 2,875.00
163 Ubin wafel ukuran 20 x 20 cm bh 2,300.00
164 Ubin warna 20 x 20 cm bh 2,645.00
165 Ubin warna 30 x 30 cm bh 3,335.00
166 Washtafel bh 788,900.00
167 Woodplank corak 4 m lbr 69,000.00
168 Woodplank polos 2 m lbr 37,375.00
169 Zincalume m2 86,250.00
170 Rangka plafon memakai Hollow dengan penutup GRC m2 101,430.00
tebal 4 mm + pengecatan
171 Tyfo Epoxy S Kg 747,500.00
172 Tyfo SHE51A m2 920,000.00
173 Karung plastik bh 2,875.00

174 Rangka atap baja ringan


a. Atap Baja Ringan memakai Genteng Keramik/Plentong
( jarak reng 22-28 cm)
- Atap Baja Ringan Pelana Bentang < 9 m Zinc-Alumunium G.550 m2 189,750.00
- Atap Baja Ringan Perisai Bentang < 9 m Zinc-Alumunium G.550 m2 201,250.00
- Atap Baja Ringan Joglo Bentang < 9 m Zinc-Alumunium G.550 m2 212,750.00
- Atap Baja Ringan Pelana Bentang 10-12 m Zinc-Alumunium G.550 m2 201,250.00
m2 218,500.00
- Atap Baja Ringan Joglo Bentang 10-12 m Zinc-Alumunium G.550 m2 230,000.00
- Atap Baja Ringan Pelana Bentang > 12 m Zinc-Alumunium G.550 m2 218,500.00
- Atap Baja Ringan Perisai Bentang > 12 m Zinc-Alumunium G.550 m2 230,000.00
- Atap Baja Ringan Joglo Bentang > 12 m Zinc-Alumunium G.550 m2 241,500.00
b. Atap Baja Ringan Genteng Metal/Spandek ( jarak reng 37,5-90 cm)
- Atap Baja Ringan Pelana Bentang < 9 m Zinc-Alumunium G.550 m2 178,250.00
- Atap Baja Ringan Perisai Bentang < 9 m Zinc-Alumunium G.550 m2 186,875.00
- Atap Baja Ringan Joglo Bentang < 9 m Zinc-Alumunium G.550 m2 195,500.00
- Atap Baja Ringan Pelana Bentang 10-12 m Zinc-Alumunium G.550 m2 184,000.00
- Atap Baja Ringan Perisai Bentang 10-12 m Zinc-Alumunium G.550 m2 201,250.00
- Atap Baja Ringan Joglo Bentang 10-12 m Zinc-Alumunium G.550 m2 212,750.00
- Atap Baja Ringan Pelana Bentang > 12 m Zinc-Alumunium G.550 m2 195,500.00
- Atap Baja Ringan Perisai Bentang > 12 m Zinc-Alumunium G.550 m2 207,000.00
- Atap Baja Ringan Joglo Bentang > 12 m Zinc-Alumunium G.550 m2 218,500.00

V. ASPAL
1 Aspal kemasan kg 14,030.00
2 Aspal curah kg 13,800.00
3 Aspal Emulsi ltr 13,110.00

VI. MINYAK
1 Premium liter 7,532.50
2 Premium (non subsidi) liter 7,532.50
3 Solar liter 5,922.50
4 Solar (non subsidi) liter 7,072.50
5 Minyak tanah liter 11,787.50
6 Olie SAE 20, 40, 60, 80 dan 120 liter 48,300.00
7 Pelumas bekisting liter 11,500.00
8 Stempet kg 28,750.00

VII.CETAKAN
1 Bata merah bh 900.00
2 Bata berongga bh 2,800.00
3 Batako bh 3,680.00
4 Genteng glazuur turbo ex Jatiwangi bh 4,025.00
5 Genteng nok/bubung diglazuur ex Jatiwangi bh 4,600.00
6 Genteng nok/bubung press mesin ex Jatiwangi bh 2,875.00
7 Genteng nok/bubung press tangan ex Jatiwangi bh 2,300.00
8 Genteng nok/bubung morando diglazuur bh 5,175.00
9 Genteng morando bh 4,025.00

VI - 296
HARGA SATUAN
NO URAIAN BAHAN/UPAH/ALAT KODE SAT. KET.
Rp
10 Genteng nok/bubung morando bh 4,600.00
11 Genteng press diglazuur ex Jatiwangi bh 2,875.00
12 Genteng press mesin ex Jatiwangi bh 2,185.00
13 Genteng press tangan ex Jatiwangi bh 1,610.00
14 Genteng Type Viktoria bh 10,350.00

VI - 297
HARGA SATUAN
NO URAIAN BAHAN/UPAH/ALAT KODE SAT. KET.
Rp
15 Genteng nok/bubung Type Viktoria bh 14,375.00
16 Genteng nok/bubung ujung Type Viktoria bh 23,000.00
17 Genteng nok/bubung ujung pertigaan Type Viktoria bh 28,750.00
18 Genteng beton bh 5,750.00
19 Genteng metal 70 x 80 cm lbr 55,200.00
20 Gorong-gorong buis beton dia. 150 cm bh/0,5 m' 598,000.00
21 Gorong-gorong buis beton dia. 100 cm bh/0,5 m' 172,500.00
22 Gorong-gorong buis beton dia. 80 cm bh/0,5 m' 161,000.00
23 Gorong-gorong buis beton dia. 60 cm bh/m' 149,500.00
24 Gorong-gorong buis beton dia. 50 cm bh/m' 143,750.00
25 Gorong-gorong buis beton dia. 40 cm bh/m' 138,000.00
26 Gorong-gorong buis beton dia. 30 cm bh/m' 92,000.00
27 Gorong-gorong buis beton dia. 20 cm bh/m' 69,000.00
28 Kansten Cetak bh 94,875.00
29 Gravel dia. 60 cm bh 86,250.00
30 Gravel dia. 40 cm bh 51,750.00
31 Gravel dia. 20 cm bh 40,250.00
32 Nok steel gelombang 1050 x 5 mm m' 33,350.00
33 Nok steel gelombang 920 x 5 mm m' 25,875.00
34 Nok / bubung genteng beton bh 6,900.00
35 Paving Block K.175 Netural tebal 8 cm m2 71,300.00
36 Paving Block K.175 motif tebal 8 cm m2 73,600.00
37 Paving Block K.175 warna tebal 8 cm m2 79,350.00
38 Paving Block K.175 Netural tebal 6 cm m2 57,500.00
39 Paving Block K.175 motif tebal 6 cm m2 60,950.00
40 Paving Block K.175 warna tebal 6 cm m2 65,550.00
41 Paving Block K.250 m2 82,150.00
42 Box Culvert Ukuran 400 x 400 x1200 Buah 1,534,100.00
43 Box Culvert Ukuran 500 x 500 x1200 Buah 1,927,055.00
44 Box Culvert Ukuran 600 x 600 x1200 Buah 2,425,350.00
45 U- Ditch Ukuran 300 x 300 x 1200 Buah 386,745.00
46 U- Ditch Ukuran 300 x 400 x 1200 Buah 436,195.00
47 U- Ditch Ukuran 300 x 500 x 1200 Buah 513,360.00
48 U- Ditch Ukuran 400 x 400 x 1200 Buah 517,960.00
49 U- Ditch Ukuran 400 x 500 x 1200 Buah 636,180.00
50 U- Ditch Ukuran 400 x 600 x 1200 Buah 717,255.00
51 U- Ditch Ukuran 500 x 500 x 1200 Buah 807,185.00
52 U- Ditch Ukuran 500 x 600 x 1200 Buah 912,295.00
53 Cover U - Ditch 300, Heavy Duty Ukuran 300 x 600 Buah 138,000.00
54 Cover U - Ditch 400, Heavy Duty Ukuran 400 x 600 Buah 172,500.00
55 Cover U - Ditch 500, Heavy Duty Ukuran 500 x 600 Buah 220,800.00
56 Tiang pancang beton Pratekan m3 5,290,000.00
57 Beton Ready Mix K-225 m3 1,044,660.22
58 Karung Goni bh 5,625.00

VIII. KAYU
1 Bambu Ø6 - Ø8 / 6 m btg 19,550.00
2 Kayu deplank 8/20 - 4 m (Jati Jateng) m3 18,400,000.00
3 Kayu deplank 8/20 - 4 m (Balau) m3 13,800,000.00
4 Kayu deplank 8/20 - 4 m (Borneo) m3 5,175,000.00
5 Kayu dolken O 8 - 10 /4 m btg 74,750.00
6 Kayu dolken O 12 - 15 /4 m btg 86,250.00
7 Kayu dolken O 5 /3 m btg 15,065.00
8 Kayu hutan/kayu perancah acuan (kayu kelas III) m3 4,025,000.00
9 Kayu kamper m3 9,430,000.00
10 Kayu kaso 5/7 meranti m3 5,750,000.00
11 Kayu kaso 5/7 meranti btg 90,850.00
12 Kayu kruing m3 8,365,100.00
13 Kayu lanan m3 7,527,900.00
14 Kayu meranti m3 6,900,000.00
15 Kayu jati Jabar m3 9,430,000.00
16 Kayu Balau (kayu kelas I) m3 10,925,000.00
17 Kayu Borneo (kayu kelas II) m3 5,750,000.00
18 Kayu bakar m3 172,500.00
19 Reng kayu borneo ukuran 2/3 cm btg 19,550.00 0.0024
20 Reng 2 x 3 cm btg 40,250.00
21 Tali Ijuk kg 20,700.00 331,200.00

IX. LAIN-LAIN
1 Air L 75.00 (10 m3 air PDAM
2 Air bersih m3 5,750.00
3 Kayu kelas III (0,03 * 0,02 * 2 * 0,8)* harga bahan per m3 kg 38,640.00
4 Jendela naco (0,04 * harga kaca) bh 3,450.00
5 seng pelat (asumsi L.90 P.1 m) lbr 43,700.00
6 kawat jaring lbr 653,738.20

VI - 298
HARGA SATUAN
NO URAIAN BAHAN/UPAH/ALAT KODE SAT. KET.
Rp
7 panel beton pracetak lbr 118,450.00
8 kolom beton pracetak batang 201,250.00
9 bahan tambahan kimia (efoksi) Liter 155,250.00
10 Strorox – 100 kg 87,975.00
11 Waterstop lebar 150 mm m' 57,500.00

VI - 299
HARGA SATUAN
NO URAIAN BAHAN/UPAH/ALAT KODE SAT. KET.
Rp
12 Waterstop lebar 200 mm m' 143,750.00
13 Waterstop lebar 230 mm - 320 mm m' 132,250.00
14 Jaring kawat baja dilas (1 lembar = 61,79 kg)untuk wiremesh M8 kg 10,580.00
15 Penjaga jarak bekisting/spacer (dari besi/baut) bh 20,700.00
16 Besi scuare tube m' 21,850.00
17 Besi lis kaca (1 x 1) cm m' 16,445.00
18 Pengelasan cm 5,060.00
20 Besi hollow (50 x 50 x 3) mm kg 8,625.00
21 Dinabolt Ø 12mm bh 2,990.00
22 Phenol film 12 mm lbr 281,750.00
23 Semen grout kg 2,760.00 setara MU 800 =
24 Screening kg 172.50 harga /m3 = Rp.
25 Besi siku L 30.30.3 kg 12,075.00
26 Besi pelat baja kg 7,475.00
27 Kawat las kg 31,050.00
28 Pintu gulung besi m2 1,122,400.00
29 Pintu lipat m2 3,116,500.00
30 Rolling door alluminium m2 460,000.00
31 Profil alluminium (silver) m' 126,500.00
32 Sealant tube 23,000.00
33 Venetions blinds dan vertical blinds (tirai) m2 122,130.00
34 Profil kaca (allumunium) m' 14,260.00
35 Sunscreen alluminium m2 442,750.00
36 Kawat nyamuk m2 287,500.00
37 Baja strip (0,2 x 2) cm kg 20,872.50
38 Jendela nako (rangka + kaca 5 mm) m2 187,680.00
39 Rangka metal hollow 40.40.2 mm m' 21,850.00
40 Baja ringan canai dingin C75 kg 16,100.00
41 HB (Batako Berlobang)-20 m3 503,125.00
42 HB (Batako Berlobang)-15 m3 575,000.00
43 HB (Batako Berlobang)-10 m3 776,250.00
44 Besi angker diameter 8 kg 14,950.00
45 Bata ringan tebal 7,5cm m3 747,500.00
46 Bata ringan tebal 10cm m3 862,500.00
47 Mortar siap pakai kg 4,312.50
48 Semen Mortar (SM) m3 1,092.50
49 Batu granit kg 5,750.00
50 Batu traso kg 5,750.00
80 ubin keramik mozaik ukuran 30 cm x 30 cm bh 4,600.00
81 plint keramik ukuran 10 cm x 20 cm bh 13,800.00
82 plint keramik ukuran 10 cm x 10 cm bh 10,350.00
83 plint keramik ukuran 5 cm x 20 cm bh 10,350.00
84 plint internal cove artistik 5 cm x 5 cm x 20 cm bh 17,250.00
85 lantai marmer ukuran 100cm x 100cm bh 920,000.00
86 Karpet m2 115,000.00
87 Lem untuk karpet kg 78,775.00
88 underlayer (pelapis bawah karpet) m2 57,500.00
89 parquet kayu m2 172,500.00
91 dinding keramik artistik 10 cm x 20 cm bh 3,910.00
92 dinding keramik artistik 5 cm x 20 cm bh 1,955.00
93 dinding marmer 100 cm x 100 cm bh 920,000.00
94 bata pelapis 3 cm x 7 cm x 24 cm bh 4,715.00
95 batu paras bh 4,830.00
96 batu tempel hitam bh 1,782.50
97 Vynil bh 12,650.00
98 Lem vynil kg 25,300.00
99 Wallpaper m' 80,500.00
100 Floor harderner kg 11,155.00
101 Asbes semen m2 42,550.00
102 Akustik lbr 58,650.00
103 Profil Allum "T" m' 113,850.00
104 Ramset bh 230.00
105 Rooflight 90 x 180 lbr 71,300.00
106 Bubung stel gelombang lbr 71,300.00
107 Nok paten 92 cm lbr 71,300.00
109 Sirap kayu bh 1,897.50
110 Aluminium gel tebal 0,55 lbr 156,400.00
113 Kunci tanam antik (belluci) bh 255,300.00
114 Kunci tanam KM bh 51,750.00
115 Kunci silinder bh 80,500.00
116 Engsel kupu-kupu bh 28,750.00
117 Engsel angin bh 23,000.00
118 Spring knip bh 25,300.00
119 Door closer set 322,000.00
120 Kunci slot bh 13,800.00

VI - 300
HARGA SATUAN
NO URAIAN BAHAN/UPAH/ALAT KODE SAT. KET.
Rp
121 Door holder bh 26,450.00
122 Door stop bh 46,000.00
123 Rel pintu sorong set 402,500.00
124 Kunci lemari set 163,300.00
125 Kaca tebal 8 mm m2 172,500.00

VI - 301
HARGA SATUAN
NO URAIAN BAHAN/UPAH/ALAT KODE SAT. KET.
Rp
126 Kaca buram 12 mm m2 414,575.00
127 Kaca cermin 5 mm m2 155,250.00
128 Kaca cermin 8 mm m2 296,355.00
129 Kaca wireglassed 5 mm m2 241,500.00
130 Kaca patri 5mm m2 2,300,000.00
131 Soda api kg 28,750.00
132 Sabun kg 12,650.00
133 Kuas bh 13,800.00
134 Pengencer kg 27,600.00
135 Teak oil ltr 34,787.50
136 Politur ltr 43,642.50
137 Politur jadi ltr 49,565.00
138 Residu atau ter ltr 31,625.00
139 Vernis ltr 39,847.50
140 Kalkarium kg 21,275.00
141 Alang-alang ikat 11,500.00
142 Cat antara kg 40,250.00
143 Wood filler kg 29,900.00
144 Woodstain kg 54,050.00
145 Sanding kg 55,200.00
146 Melamic kg 50,025.00
147 Urinoir unit 746,350.00
150 Baja tulangan kg 20,872.50
151 Kayu bekisting m2 40,250.00
152 Waterdrain bh 442,750.00
153 Floor drain unit 94,875.00
154 genteng palentong kecil bh 1,035.00
155 genteng kodok glazuur bh 1,610.00
156 genteng palentong besar/super bh 1,725.00
157 genteng bubung palentong besar bh 6,900.00
158 Nok genteng beton bh 4,600.00
159 Nok genteng metal bh 51,060.00
160 Pipa listrik 5/8” btg 5,750.00
161 Kabel 1,5 x 2 m 9,200.00
162 Kabel 1,5 x 3 m 13,800.00
163 Kabel 2,5 x 2 m 14,950.00
164 Kabel 2,5 x 3 m 17,250.00
165 T Dus bh 2,300.00
166 L Bow bh 2,300.00
167 Las Dop bh 3,450.00
168 Mongkok bh 1,150.00
169 Saklar tunggal bh 14,950.00
170 Saklar ganda bh 18,400.00
171 Fitting tempel bh 5,175.00
172 Fitting gantung bh 4,025.00
173 M C B bh 34,500.00
174 digital print m' 28,750.00
175 Lampu pijar 25 s/d 100 watt (phlips) bh 13,800.00
176 Lampu Sl philip 18 watt bh 41,400.00
177 Lampu Sl philip 25 watt bh 54,050.00
178 Downlight + SL 25 watt philip bh 88,550.00
179 Lampu taman + tiang + lampu 1 buah bh 287,500.00
180 Stop kontak broco standard bh 14,950.00
181 kawat arde m 12,650.00
182 over spaneng m 10,350.00
183 arde btg 12,650.00
184 box sikring bh 46,000.00
185 box MCB bh 5,750.00
186 Holo 4/4 meni btg 13,915.00
187 Holo 2/4 meni btg 12,650.00
188 Kawat Bwg 12 kg 11,500.00
189 Paku screw 2.5 cm bh 57.50
190 Adhesive kg 6,900.00
191 Kain kasa m' 460.00
192 Cat penutup 2 kali kg 28,750.00
193 Paku beton bh 201.25

VI - 302
HARGA SATUAN
NO URAIAN BAHAN/UPAH/ALAT KODE SAT. KET.
Rp
194 Kabel Listrik NYA 3 x 2,5 mm m' 7,475.00
195 Bata berongga expose bh 2,990.00
196 Atap Selulosa uk. 195 x 96 cm bh 172,500.00
197 Paku/screw atap selulosa bh 1,380.00

VI - 303
HARGA SATUAN
NO URAIAN BAHAN/UPAH/ALAT KODE SAT. KET.
Rp
198 Nok/bubung untuk atap selulosa untuk uk. 106 x 40 cm bh 94,875.00
199 Atap Selulosa uk. 106 x 40 cm bh 58,075.00
200 Nok/Bubung untuk Atap Selulosa 195 x 96 cm bh 101,200.00
201 Tabung Gas kg 21,850.00
202 Atap Bitumen Bergelombang Monolayer 3 mm LBR 189,175.00

X. BAHAN JALAN LINGKUNAN


1 Pasir Beton (Kasar) M01a M3 244,375.00
2 Pasir Halus (untuk HRS) M01c M3 222,755.00
3 Agregat Kasar (5-40 mm) M03 M3 345,000.00
4 Agregat Halus (0-5 mm) M04 M3 345,000.00
5 Agregat Kasar (tertahan pada ayakan 4,75 mm) M3 345,000.00
6 Agregat Halus (lolos saringan 4,75 mm) M3 345,000.00
7 Filler M05 Kg 460.00
8 Bahan Tanah Timbunan M08 M3 143,750.00
9 Bahan Pilihan M09 M3 172,500.00
10 Aspal M10 KG 14,030.00
11 Kerosen / Minyak Tanah M11 LITER 11,758.75
12 Chipping M41 M3 281,750.00
13 Chipping (kg) M41kg Kg 149.49
14 Bahan Agregat Kelas A M26 M3 395,945.00
15 Bahan Agregat Kelas B M27 M3 325,335.00
16 Formworks M2 45,000.00

X. PERPIPAAN, SANITASI DAN ACCESSORIES


1 Pipa Galv.Medium dia. 1/2" m' 43,077.20
2 Pipa Galv.Medium dia. 3/4" m' 49,425.00
3 Pipa Galv.Medium dia. 1" m' 61,258.70
4 Pipa Galv.Medium dia. 1 1/2" m' 88,015.62
5 Pipa Galv.Medium dia. 2" m' 107,662.92
6 Pipa Galv.Medium dia. 2 1/2" m' 130,457.98
7 Pipa Galv.Medium dia. 3" m' 190,395.83
8 Pipa Galv.Medium dia. 4" m' 285,011.25
9 Pipa Galv.Medium dia. 6" m' 434,439.77
10 Pipa PVC AW dia. 1/2" m' 5,733.75
11 Pipa PVC AW dia. 3/4" m' 7,903.50
12 Pipa PVC AW dia. 1" m' 10,915.09
13 Pipa PVC AW dia. 1 1/2" m' 18,562.50
14 Pipa PVC AW dia. 2" m' 23,859.06
15 Pipa PVC AW dia. 2 1/2" m' 34,774.38
16 Pipa PVC AW dia. 3" m' 48,362.50
17 Pipa PVC AW dia. 4" m' 79,850.00
18 Pipa PVC AW dia. 6" m' 177,225.63
19 Pipa PVC AW dia. 8" m' 300,181.75
20 Pipa PVC S.10 dia. 1/2" m' 5,336.04
21 Pipa PVC S.10 dia. 3/4" m' 8,020.83
22 Pipa PVC S.10 dia. 1" m' 11,999.17
23 Pipa PVC S.10 dia. 1 1/2" m' 32,238.75
24 Pipa PVC S.12,5 dia. 1 1/2" m' 16,412.92
25 Pipa PVC S.12,5 dia. 2" m' 33,783.75
26 Pipa PVC S.12,5 dia. 3" m' 69,785.83
27 Pipa PVC S.12,5 dia. 4" m' 102,291.67
28 Pipa PVC S.12,5 dia. 6" m' 218,400.42
29 Pipa PVC S.12,5 dia. 8" m' 338,735.83
30 Pipa HDPE PN 16 dia. 1/2" m' 8,901.50
31 Pipa HDPE PN 16 dia. 3/4" m' 11,695.10
32 Pipa HDPE PN 16 dia. 1" m' 18,981.00
33 Pipa HDPE PN 12,5 dia. 1 1/2" m' 41,104.00
34 Pipa HDPE PN 12,5 dia. 2" m' 65,286.00
35 Pipa HDPE PN 12,5 dia. 2 1/2" m' 93,096.00

VI - 304
HARGA SATUAN
NO URAIAN BAHAN/UPAH/ALAT KODE SAT. KET.
Rp
36 Pipa HDPE PN 12,5 dia. 3" m' 132,338.50
37 Pipa HDPE PN 12,5 dia. 4" m' 195,886.00
38 Pipa HDPE PN 12,5 dia. 5" m' 253,266.00

VI - 305
HARGA SATUAN
NO URAIAN BAHAN/UPAH/ALAT KODE SAT. KET.
Rp
39 Pipa HDPE PN 12,5 dia. 6" m' 414,080.00
40 Pipa HDPE PN 12,5 dia. 8" m' 645,100.00
41 Pipa HDPE PN 12,5 dia. 10" m' 963,127.50
42 Pipa PVC Air limbah dia. 1 1/2" m' 35,781.25
43 Pipa PVC Air limbah dia. 2" m' 45,958.33
44 Pipa PVC Air limbah dia. 2 1/2" m' 55,325.00
45 Pipa PVC Air limbah dia. 3" m' 65,672.22
46 Pipa PVC Air limbah dia. 4" m' 78,180.56
47 Pipa PVC Air limbah dia. 6" m' 144,997.22
48 Pipa PVC Air limbah dia. 8" m' 222,355.56
49 Tangki Air kav.0,8 m3 bh 2,900,000.00
50 Tangki Air kav.1 m3 bh 3,500,000.00
51 Tangki Air kav.1,5 m3 bh 5,750,000.00
52 Tangki Air kav.2 m3 bh 7,200,000.00
53 Tangki Air kav.3 m3 bh 11,000,000.00
54 Tangki Air kav.5 m3 bh 18,000,000.00
55 Tangki Air kav.10 m3 bh 40,000,000.00
56 Tangki Air kav.15 m3 bh 62,000,000.00
57 Tangki Air Tanam kav.0,8 m3 bh 3,200,000.00
58 Tangki Air Tanam kav.1 m3 bh 4,150,000.00
59 Tangki Air Tanam kav.1,5 m3 bh 6,300,000.00
60 Tangki Air Tanam kav.2 m3 bh 8,550,000.00
61 Tangki Air Tanam kav.3 m3 bh 13,500,000.00
62 Tangki Air Tanam kav.5 m3 bh 21,000,000.00
63 Tangki Air Tanam kav.10 m3 bh 45,000,000.00
64 Pipa tanah Ǿ 20 cm bh 173,200.00
65 pipa tanah diameter 15 cm bh 113,200.00
66 pipa beton diameter 15 – 20 cm bh 44,300.00
67 pipa beton diameter 30 – 100 cm bh 66,000.00
68 Septic Tank Bio kav. 4 - 5 org bh 3,770,000.00
69 Septic Tank Bio kav. 6 - 8 org bh 6,466,666.67
70 Septic Tank Bio kav. 10 - 12 org bh 9,633,333.33
71 Septic Tank Bio kav. 12 - 14 org bh 12,641,666.67
72 Septic Tank Bio kav. 40 - 50 org bh 62,000,000.00
73 Septic Tank Bio kav. 50 - 70 org bh 94,083,333.33
74 Septic Tank Bio kav. 80 - 100 org bh 126,000,000.00
75 Septic Tank Bio kav. 110 - 120 org bh 157,250,000.00
76 Septic Tank Bio kav. 130 - 150 org bh 189,000,000.00
77 Boch Gal.dia.1/2" bh 15,971.25
78 Boch Gal.dia.3/4" bh 22,730.00
79 Boch Gal.dia.1" bh 31,693.75
80 Boch Gal.dia.1 1/2" bh 72,703.75
81 Boch Gal.dia. 2" bh 162,265.00
82 Boch Gal.dia. 2 1/2" bh 261,271.25
83 Boch Gal.dia. 3" bh 355,131.25
84 Tee Gal.dia.1/2" bh 13,357.50
85 Tee Gal.dia.3/4" bh 18,327.50
86 Tee Gal.dia.1" bh 22,890.00
87 Tee Gal.dia.1 1/2" bh 42,145.00
88 Tee Gal.dia. 2" bh 55,140.00
89 Tee Gal.dia. 2 1/2" bh 111,347.50
90 Tee Gal.dia. 3" bh 173,282.50
91 Double neplee Gal.dia.1/2" bh 11,860.00
92 Double neplee Gal.dia.3/4" bh 19,241.67
93 Double neplee Gal.dia.1" bh 30,566.67
94 Double neplee Gal.dia.1 1/2" bh 59,991.67
95 Double neplee Gal.dia. 2" bh 81,345.83
96 Double neplee Gal.dia. 2 1/2" bh 79,952.50
97 Double neplee Gal.dia. 3" bh 146,130.00
98 Water mur Gal.dia.1/2" bh 28,861.25

VI - 306
HARGA SATUAN
NO URAIAN BAHAN/UPAH/ALAT KODE SAT. KET.
Rp
99 Water mur Gal.dia.3/4" bh 39,795.00
100 Water mur Gal.dia.1" bh 47,551.25
101 Water mur Gal.dia.1 1/2" bh 93,348.75

VI - 307
HARGA SATUAN
NO URAIAN BAHAN/UPAH/ALAT KODE SAT. KET.
Rp
102 Water mur Gal.dia. 2" bh 122,720.00
103 Water mur Gal.dia. 2 1/2" bh 190,045.00
104 Water mur Gal.dia. 3" bh 281,580.00
105 Dop Gal.dia.1/2" bh 7,310.00
106 Dop Gal.dia.3/4" bh 9,395.00
107 Dop Gal.dia.1" bh 14,590.00
108 Dop Gal.dia.1 1/2" bh 23,197.50
109 Dop Gal.dia. 2" bh 37,961.25
110 Dop Gal.dia. 2 1/2" bh 55,092.50
111 Dop Gal.dia. 3" bh 84,313.75
112 Socket Gal.dia.1/2" bh 6,842.50
113 Socket Gal.dia.3/4" bh 8,110.00
114 Socket Gal.dia.1" bh 13,753.75
115 Socket Gal.dia.1 1/2" bh 25,578.75
116 Socket Gal.dia. 2" bh 38,026.25
117 Socket Gal.dia. 2 1/2" bh 53,178.75
118 Socket Gal.dia. 3" bh 88,077.50
119 Knee Gal.dia.1/2" x 90 bh 8,377.50
120 Knee Gal.dia.3/4" x 90 bh 14,425.00
121 Knee Gal.dia.1" x 90 bh 18,878.75
122 Knee Gal.dia.2" x 90 bh 42,292.50
123 Knee Gal.dia. 2" x 45 bh 51,305.00
124 Knee Gal.dia. 3" x 90 bh 126,802.50
125 Knee Gal.dia. 3" x 45 bh 141,578.75
126 Gate Valve dia.1/2" bh 75,111.25
127 Gate Valve dia.3/4" bh 114,773.75
128 Gate Valve dia.1" bh 172,395.00
129 Gate Valve dia.1 1/2" bh 335,310.00
130 Gate Valve dia.2" bh 1,016,451.67
131 Gate Valve dia.3" bh 1,910,677.50
132 Gate Valve dia.4" bh 2,666,833.33
133 Check Valve dia.1/2" bh 91,412.50
134 Check Valve dia.3/4" bh 121,529.17
135 Check Valve dia.1" bh 196,180.20
136 Check Valve dia.1 1/2" bh 402,991.67
137 Check Valve dia.2" bh 618,876.67
138 Check Valve dia.3" bh 1,927,000.00
139 Check Valve dia.4" bh 3,855,750.00
140 Ball Valve dia.1/2" bh 121,727.50
141 Ball Valve dia.3/4" bh 149,114.17
142 Ball Valve dia.1" bh 220,076.67
143 Ball Valve dia.2" bh 661,766.67
144 Ball Valve dia.3" bh 1,938,308.33
145 Plug krant dia.1/2" bh 80,640.00
146 Plug krant dia.3/4" bh 124,466.67
147 Plug krant dia.1" bh 174,900.00
148 Atap kran/Bibcok 1/2" bh 34,498.33
149 Atap kran/Bibcok 3/4" bh 60,825.00
150 Seal Tape bh 4,200.00
151 Water meter dia.1/2" bh 570,620.00
152 Water meter dia.3/4" bh 1,214,000.00
153 Water meter dia.1" bh 3,146,886.67
154 Water meter dia.1 1/2" bh 5,686,748.75
155 Water meter dia.2" bh 6,926,259.17
156 Water meter dia.3" bh 6,019,930.00
157 Box meter bh 74,392.50
158 Clam sadel 2 x 1/2" bh 38,505.10
159 Clam sadel 2 x 3/4" bh 39,841.98
160 Clam sadel 2 x 1" bh 42,459.58
161 Clam sadel 3 x 1/2" bh 53,269.58

VI - 308
HARGA SATUAN
NO URAIAN BAHAN/UPAH/ALAT KODE SAT. KET.
Rp
162 Clam sadel 3 x 3/4" bh 53,269.58
163 Clam sadel 3 x 1" bh 59,052.17
164 Tee all flang 2" x 2" bh 425,700.00

VI - 309
HARGA SATUAN
NO URAIAN BAHAN/UPAH/ALAT KODE SAT. KET.
Rp
165 Tee all flang 3" x 2" bh 720,720.00
166 Tee all flang 3" x 3" bh 817,740.00
167 Tee all flang 4" x 2" bh 900,900.00
168 Tee all flang 4" x 3" bh 956,340.00
169 Tee all flang 4" x 4" bh 970,200.00
170 Bend all flang 2" x 90 bh 462,000.00
171 Bend all flang 2" x 45 bh 462,000.00
172 Bend all flang 3" x 90 bh 630,300.00
173 Bend all flang 3" x 45 bh 606,650.00
174 Bend all flang 4" x 90 bh 762,300.00
175 Bend all flang 4" x 45 bh 745,250.00
176 Gibol joint 2" bh 197,610.67
177 Gibol joint 2 1/2" bh 142,416.00
178 Gibol joint 3" bh 234,247.33
179 Gibol joint 4" bh 345,697.67
180 Flange Las 2" bh 78,786.67
181 Flange Las 3" bh 110,022.42
182 Flange Las 4" bh 189,441.25
183 Flange Las 6" bh 458,203.33
184 Baut & mur 5/8 x 3 bh 11,990.00
185 Baut & mur 5/8 x 4 bh 14,190.00
186 Baut & mur 5/8 x 5 bh 14,575.00
187 Baut & mur 5/8 x 6 bh 15,950.00
188 Manhole (Kotak/bulat) Uk.30 T.7mm bh 1,133,333.33
189 Manhole (Kotak/bulat) Uk.50 T.7mm bh 1,266,666.67
190 Manhole (Kotak/bulat) Uk.70 T.7mm bh 1,366,666.67
191 Pompa Submersible 1,5 KW-2HP 380 V Set 15,590,252.00
192 Pompa Submersible 2,2 KW-3HP 380 V Set 17,876,000.00
193 Pompa Submersible 3,0 KW-4HP 380 V Set 20,658,324.00
194 Pompa Submersible 4,0 KW-5,5HP 380 V Set 28,386,173.50
195 Panel pompa Set 5,000,000.00
196 Pemasangan Box Street dia. 8" bh 5,500.00

B. UPAH
1 Mandor /hari 120,000.00 17,142.86
2 Kepala tukang /hari 120,000.00 17,142.86
3 Tukang kayu / besi /hari 110,000.00 15,714.29
4 Tukang batu /hari 110,000.00 15,714.29
5 Tukang bor /hari 110,000.00 15,714.29
6 Tukang Las /hari 120,000.00 17,142.86
7 Pembantu tukang/Pekerja /hari 80,000.00 11,428.57
8 Operator terlatih /hari 140,000.00 20,000.00
9 Operator kurang terlatih /hari 85,000.00 12,142.86
10 Pembantu operator /hari 80,000.00 11,428.57
11 Supir truk /hari 90,000.00 12,857.14
12 Pembantu supir /hari 80,000.00 11,428.57
13 Mekanik /hari 90,000.00 12,857.14
14 Pembantu mekanik /hari 80,000.00 11,428.57
15 Buruh lapangan terlatih /hari 100,000.00 14,285.71
16 Buruh lapangan kurang terlatih /hari 80,000.00 11,428.57
17 Buruh lapangan tak terlatih / pekerja /hari 80,000.00 11,428.57

C. ALAT
1 Sewa crane (10 Ton) unit/hari 4,485,000.00
2 Sewa pipe support buah/hari 341,550.00
3 Sewa scaffolding unit/hari 341,550.00
4 Sewa Tripot/Tackel & handle crane 2 T unit/hari 4,025,000.00
5 Sewa excavator type 225 kapasitas 0,5 - 1,0 m3 unit/hari 1,835,400.00
6 Peralatan potong pipa T1/manual (gergaji) /saw unit/hari 57,500.00
7 Peralatan potong pipa T2/manual (gergaji) /saw unit/hari 57,500.00
8 Mobile crane £ 3 ton unit/hari 1,667,500.00
9 Sewa Genset 1500 watt unit/hari 1,420,020.00
10 Sewa Pompa Submersible 3 m3/h unit/hari 379,500.00
11 Sewa crane (3 Ton) Jam 132,250.00

VI - 310
HARGA SATUAN
NO URAIAN BAHAN/UPAH/ALAT KODE SAT. KET.
Rp
12 Compressor Jam 78,556.50
13 Driling rig + perlengkapan (daerah batuan keras) m 805,000.00 100,625.00
14 Driling rig + perlengkapan (daerah batuan sedang) m 603,750.00
15 Mesin Las Jam 230,000.00
16 Mesin Blower Jam 345,000.00

VI - 311
HARGA SATUAN
NO URAIAN BAHAN/UPAH/ALAT KODE SAT. KET.
Rp

ALAT JALAN
1 EXCAVATOR 80-140 HP E10 Jam 432,395.76
2 DUMP TRUCK 3.5 TON E08 Jam 261,574.70
3 WHEEL LOADER 1.0-1.6 M3 E15 Jam 477,782.58
4 MOTOR GRADER >100 HP E13 Jam 442,856.52
5 VIBRATORY ROLLER 5-8 T. E19 Jam 282,396.73
6 WATER TANKER 3000-4500 L. E23 Jam 362,404.86
7 TANDEM ROLLER 6-8 T. E17 Jam 445,867.99
8 ASPHALT DISTRIBUTOR E41 Jam 418,424.11
9 COMPRESSOR 4000-6500 L\M E05 Jam 168,688.05
10 TIRE ROLLER 8-10 T. E18 Jam 489,172.15
11 ASPHALT MIXING PLANT E01 Jam 9,343,417.71
12 GENERATOR SET E12 Jam 353,061.25
13 ASPHALT FINISHER E02 Jam 311,844.07
14 DUMP TRUCK 5 TON E09 Jam 402,962.24
15 THREE WHEEL ROLLER 6-8 T E16 Jam 252,193.22
16 ASPHALT SPRAYER E03 Jam 142,633.79
17 Beton Mixer E06 Jam 105,863.51
18 Concrete Vibrator E20 Jam 70,246.91
19 Flat Bed Truck E11 Jam 477,880.80

Sumber, 2020

Kepala Dinas Perumahan, Kawasan Permukiman Dan


Pertanahan Kabupaten Cirebon

H. SUKMA NUGRAHA, SH.,MM.


NIP. 19610301 198603 1 012

VI - 312
HARGA PERKIRAAN SENDIRI (HPS)
RENCANA BIAYA : PEMBANGUNAN / REHABILITASI
TAHUN : 2020
DESA :
KECAMATAN :
KABUPATEN : C I R E B O N

HARGA
JUMLAH
NO JENIS PEKERJAAN ANALISA VOLUME SATUAN
Rp Rp
1 2 3 4 5 6

I PEKERJAAN PERSIAPAN
1 (K3) Pembuatan 1 m2 gudang semen dan peralatan A. 2.2.1.7. m2 -
2 Pengukuran dan pemasangan 1 m’ Bouwplank A. 2.2.1.4. m' -
3 (K3) Pembuatan 1 m2 steger/perancah dari bambu A. 2.2.1.10. m2 -
4 Papan nama proyek SNI.100.03 bh -
-

II PEKERJAAN BONGKARAN
1 Pembongkaran 1 m3 beton bertulang A. 2.2.1.13. m3 -
2 Pembongkaran 1 m3 dinding tembok bata A. 2.2.1.14. m3 -
-

III PEKERJAAN GALIAN/URUGAN


1 Penggalian 1 m3 tanah biasa sedalam 1 m A.2.3.1.1. m3 -
2 Pengurugan kembali 1 m3 galian tanah A.2.3.1.9. m3 -
3 (K3) Pemadatan tanah 1 m3 tanah ( per 20 cm) A.2.3.1.10. m3 -
4 Pengurugan 1 m3 dengan pasir urug A.2.3.1.11. m3 -
-

IV PEKERJAAN PONDASI
1 Pengurugan 1 m3 dengan pasir urug A.2.3.1.11. m3 -
2 (K3) Pemasangan 1 m3 batu kosong (anstamping) A.3.2.1.9. m3 -
3 Pemasangan 1 m3 pondasi batu belah campuran 1SP : 5PP A.3.2.1.3 m3 -
-

V PEKERJAAN BETON/PEMBESIAN
1 Pembesian 10 kg dengan besi polos atau besi ulir A.4.1.1.17 kg -
2 (K3) Pemasangan 1 m2 bekisting untuk pondasi A.4.1.1.20 m2 -
3 (K3) Pemasangan 1 m2 bekisting untuk sloof A.4.1.1.21 m2 -
4 (K3) Pemasangan 1 m2 bekisting untuk kolom A.4.1.1.22 m2 -
5 (K3) Pemasangan 1 m2 bekisting untuk balok A.4.1.1.23 m2 -
6 (K3) Pemasangan 1 m2 bekisting untuk lantai A.4.1.1.24 m2 -
7 (K3) Pemasangan 1 m2 bekisting untuk dinding A.4.1.1.25 m2 -
8 (K3) Pemasangan 1 m2 bekisting untuk tangga A.4.1.1.26 m2 -
Membuat 1 m3 beton mutu f’c = 7,4 Mpa (sama dengan K 100),
9 A.4.1.1.1 m3
setara dengan beton rabat -
10 Membuat 1 m3 beton mutu f’c = 9,8 Mpa (sama dengan K-125) A.4.1.1.2 m3 -
11 Membuat 1 m3 beton mutu f’c = 12,2 Mpa (sama denga K 150) A.4.1.1.3 m3 -
Membuat 1 m3 lantai kerja beton mutu f’c = 7,4 MPa slump (3-6)
12 A.4.1.1.4 m3
cm, w/c = 0,87 -
Membuat 1 m3 beton mutu f’c = 14,5 MPa, slump (120 ± 20) mm
13 A.4.1.1.5. m3
(sama dengan K 175) -
14 Membuat 1 m3 beton mutu f’c = 16,9 Mpa (sama dengan K 220) A.4.1.1.6 m3 -
15 Membuat 1 m3 beton mutu f’c = 19,3 Mpa (sama dengan K 225) A.4.1.1.7. m3 -
16 Membuat 1 m3 beton mutu f’c = 21,7 Mpa (sama dengan K 250) A.4.1.1.8. m3 -
17 Membuat 1 m3 beton mutu f’c = 24,0 Mpa (sama dengan K 325) A.4.1.1.9. m3 -

VII - 313
18 Membuat 1 m3 beton mutu f’c = 26,4 Mpa (sama dengan K 350) A.4.1.1.10. m3 -
19 Membuat 1 m3 beton mutu f’c = 28,8 Mpa (sama dengan K 375) A.4.1.1.11. m3 -
Membuat 1 m3 beton mutu f’c = 31,2 MPa, slump (120 ± 20) mm
20 A.4.1.1.12. m3
(sama dengan K 425) -
21 Membuat 1 m3 beton kedap air dengan strorox – 100 A.4.1.1.13 m3 -
22 Membuat 1 m’ kolom praktis beton bertulang (11 x 11) cm A.4.1.1.35 m' -
23 Membuat 1 m’ ring balok beton bertulang (10 x 15) cm A.4.1.1.36 m' -
-

VI PEKERJAAN PASANGAN DINDING BATA


Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu
1 A. 4.4.1.4. m2
campuran 1SP : 5PP -
Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu
2 A. 4.4.1.10 m2
campuran 1SP :5PP -
Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu
3 A. 4.4.1.15 m2
campuran 1SM : 1KP :2PP -
4 Pemasangan 1 m2 plesteran 1SP : 5PP tebal 15 mm A.4.4.2.5. m2 -
5 Pemasangan 1 m2 acian A.4.4.2.27. m2 -
6 Pemasangan 1 m2 plesteran granit 1SP : 2 granit tebal 1cm A.4.4.2.21. m2 -
7 Pemasangan 1 m2 plesteran ciprat 1SP : 2PP A.4.4.2.23. m2 -
8 Pemasangan 1 m2 finishing siar pasangan conblock ekspose A.4.4.2.25. m2 -
Pemasangan 1 m2 finishing siar pasangan batu kali, campuran 1SP
9 A.4.4.2.26. m2
: 2PP -
10 Pemasangan 1 m2 dinding keramik 20 cm x 20 cm A.4.4.3.54. m2 -
-
-
VII PEKERJAAN KUSEN,PINTU DAN JENDELA
Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela,
1 A.4.6.1.1. m3
kayu kelas I -
Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela,
2 A.4.6.1.2. m3
kayu kelas II atau III -
Pembuatan dan pemasangan 1 m2 pintu dan jendela kaca, kayu
3 A.4.6.1.6. m2
kelas I atau II -
Pembuatan dan pemasangan 1 m2 pintu dan jendela jalusi kayu
4 A.4.6.1.7. m2
kelas I atau II -

5 Pemasangan 1 m2 teakwood rangkap, rangka expose kayu kelas I A.4.6.1.11. m2


-
Pemasangan 1 m2 teakwood rangkap lapis formika, rangka expose
6 A.4.6.1.12. m2
kayu kelas II -
7 Pemasangan 1 m kusen pintu alluminium A.4.2.1.11. m' -
8 Pemasangan 1 m2 pintu alluminium strip lebar 8 cm A.4.2.1.12. m2 -
Pemasangan 1 m2 langit-langit gypsum board ukuran (120x240x9)
9 A.4.5.1.7. m2
mm, tebal 9 mm -
10 Pemasangan 1 m’ list langit-langit kayu profil A.4.5.1.9. m' -
11 Pemasangan 1 m2 kaca tebal 3 mm A.4.6.2.16. m2 -
12 Pemasangan 1 m2 kaca tebal 5 mm A.4.6.2.17. m2 -
13 Pemasangan 1 m2 kaca tebal 8 mm A.4.6.2.18. m2 -
14 Pemasangan 1 m2 kaca buram tebal 12 mm A.4.6.2.19. m2 -
15 Pemasangan 1 m2 kaca cermin tebal 5 mm A.4.6.2.20. m2 -
-

VIII PEKERJAAN KUDA-KUDA / ATAP

1 - Atap Baja Ringan Pelana Bentang < 9 m Zinc-Alumunium G.550 - m2


-

2 Pemasangan 1 m2 rangka atap genteng keramik, kayu kelas II A.4.6.1.16. m2


-

3 Pemasangan 1 m2 rangka atap genteng beton, kayu kelas II A.4.6.1.17. m2


-
4 Pemasangan 1 m2 rangka atap sirap, kayu kelas II A.4.6.1.18. m2 -
Pemasangan 1 m2 rangka langit-langit (50 x 100) cm, kayu kelas
5 A.4.6.1.19. m2
II atau III -
Pemasangan 1 m2 rangka langit-langit (60 x 60) cm, kayu kelas
6 A.4.6.1.20. m2
II atau III -
Pemasangan 1 m’ lisplank ukuran (3 x 20) cm, kayu kelas I atau
7 A.4.6.1.21. m'
kelas II -

VII - 314
Pemasangan 1 m’ lisplank ukuran (3 x 30) cm, kayu kelas I atau
8 A.4.6.1.22. m'
kelas II -
Pemasangan 1 m2 rangka dinding pemisah (60 x 120) cm kayu
9 A.4.6.1.23. m2
kelas II atau III -
10 Pemasangan 1 m2 dinding lambrisering dari papan kayu kelas I A.4.6.1.26. m2 -
11 Pemasangan 1 m2 atap genteng palentong kecil A.4.5.2.1. m2 -
12 Pemasangan 1 m2 atap genteng palentong besar/super A.4.5.2.3. m2 -
13 Pemasangan 1 m’ bubung genteng palentong A.4.5.2.4. m' -
14 Pemasangan 1 m’ bubung genteng palentong besar A.4.5.2.6. m' -
Pemasangan 1 m’ lisplank ukuran (3 x 20) cm, kayu kelas I atau
15 A.4.6.1.21. m'
kelas II -
Pemasangan 1 m’ lisplank ukuran (3 x 30) cm, kayu kelas I atau
16 A.4.6.1.22. m'
kelas II -

17 Pemasangan 1 m2 atap asbes gelombang 0,92 m x 2 ,5 m x 5 mm A.4.5.2.8. m2


-
18 Pemasangan 1 m’ bubung stel gelombang 0,92 m A.4.5.2.22. m' -
19 Pemasangan 1 m’ nok paten 0,92 m A.4.5.2.22. m' -
-

IX PEKERJAAN LANTAI
1 Pengurugan 1 m3 dengan pasir urug A.2.3.1.11. m3 -

2 Pemasangan 1 m2 lantai ubin PC abu-abu ukuran 40cm x 40 cm A.4.4.3.1. m2


-

3 Pemasangan 1 m2 lantai ubin warna ukuran 40 cm x 40 cm A.4.4.3.4. m2


-

4 Pemasangan 1 m2 lantai ubin granit ukuran 40 cm x 40 cm A.4.4.3.9. m2


-
Pemasangan 1 m2 lantai ubin teralux marmer ukuran 40 cm x 40
5 A.4.4.3.14. m2
cm -
6 Pemasangan 1 m2 lantai keramik ukuran 33 cm x 33 cm A.4.4.3.34. m2 -
7 Pemasangan 1m2 lantai keramik ukuran 30 cm x 30 cm A.4.4.3.35. m2 -
8 Pemasangan 1m2 lantai keramik ukuran 20 cm x 20 cm A.4.4.3.36. m2 -
9 Pemasangan 1 m2 dinding keramik 20 cm x 20 cm A.4.4.3.54. m2 -

10 Pemasangan 1 m’ plint ubin Pc abu-abu ukuran 10cm x 40cm A.4.4.3.18. m'


-
11 Pemasangan 1 m’ plint ubin warna ukuran 10 cm x 40 cm A.4.4.3.21. m' -
12 Pemasangan 1 m’ plint ubin granit ukuran 10 cm x 40 cm A.4.4.3.24. m' -
13 Pemasangan 1 m’ plint keramik ukuran 10 cm x 20 cm A.4.4.3.39. m' -
14 Pemasangan 1 m2 paving block natural tebal 6 cm A.4.4.3.64. m2 -
15 Pemasangan 1 m2 paving block berwarna tebal 6 cm A.4.4.3.66. m2 -
-

X PEKERJAAN BESI / LAIN-LAIN


1 Pemasangan 1 buah kunci tanam biasa A.4.6.2.2. bh -
2 Pemasangan 1 buah engsel pintu A.4.6.2.5. bh -
3 Pemasangan 1 buah kait angin A.4.6.2.9. bh -
4 Pemasangan 1 buah engsel jendela kupu-kupu A.4.6.2.6. bh -
5 Pemasangan 1 buah door closer A.4.6.2.10. bh -
6 Pemasangan 1 buah kunci slot (grendel) A.4.6.2.11. bh -
7 (K3) Pemasangan 1 buah closet duduk/monoblock A.5.1.1.1. bh -
8 Pemasangan 1 buah closet jongkok porselen A.5.1.1 2. bh -
9 (K3) Pemasangan 1 buah urinoir A.5.1.1 4. bh -
10 (K3) Pemasangan 1 buah wastafel A.5.1.1 5. bh -
11 Pemasangan 1 buah bak cuci piring stainlessteel A.5.1.1 12. bh -
12 Pemasangan 1 buah floor drain A.5.1.1 14. bh -

13 Pemasangan 1 buah bak kontrol pasangan bata 30x30 tinggi 35 cm A.5.1.1 15. bh
-
14 Pemasangan 1 m’ pipa galvanis diameter ½” A.5.1.1 18. m' -
15 Pemasangan 1 m’ pipa PVC tipe AW diameter ½ ” A.5.1.1 25. m' -
16 (K3) Pemasangan 1 buah titik lampu (Instalasi) A.8.4.6.1 bh -
17 (K3) Pemasangan 1 buah MCB (Penyambungan Daya ke PLN) A.8.4.6.1 bh -
-

VII - 315
XI PEKERJAAN MENGECAT
1 m2 Pengecatan bidang kayu baru (1 lapis plamuur, 1 lapis cat
1 A.4.7.1.4. m2
dasar, 2 lapis cat penutup) -
Pengecatan 1 m2 tembok baru (1 lapis plamuur, 1 lapis cat dasar, 2
2 A.4.7.1.10. m2
lapis cat penutup) -
3 Pengecatan 1 m2 permukaan baja dengan menie besi A.4.7.1.16. m2 -

4 Pengecatan 1 m2 permukaan baja galvanis secara manual 4 lapis A.4.7.1.18. m2


-
5 Plituran 10 m2 dengan plitur melamic A.4.7.1.22. m2 -
6 Pemasangan 1 m2 wallpaper A.4.7.1.15. m2 -
7 1 m2 Pengikisan/pengerokan permukaan cat lama A.4.7.1.1. m2 -
-

REKAPITULASI
I PEKERJAAN PERSIAPAN Rp -
II PEKERJAAN BONGKARAN Rp -
III PEKERJAAN GALIAN/URUGAN Rp -
IV PEKERJAAN PONDASI Rp -
V PEKERJAAN BETON/PEMBESIAN Rp -
VI PEKERJAAN PASANGAN DINDING BATA Rp -
VII PEKERJAAN KUSEN,PINTU DAN JENDELA Rp -
VIII PEKERJAAN KUDA-KUDA / ATAP Rp -
IX PEKERJAAN LANTAI Rp -
X PEKERJAAN BESI / LAIN-LAIN Rp -
XI PEKERJAAN MENGECAT Rp -
JUMLAH -

PPN 10 % Rp -
JUMLAH TOTAL Rp -

DIBULATKAN Rp -

TERBILANG : ( ………………………………………….. )

Sumber, 2020

Kepala Dinas Perumahan, Kawasan Permukiman Dan


Pertanahan Kabupaten Cirebon

H. SUKMA NUGRAHA, SH.,MM.


NIP. 19610301 198603 1 012

VII - 316
Paraf
Tim Teknis Penyusun
Disiapkan
Analisa
Diperiksa Kasie Perencanaan

Mengetahui Kabid Bina Teknik


RISALAH ANALISA
- Pemasangan 1 m2 dinding bata berongga ekspose 5 x 10,5 x 21 campuran
1SP :3PP (Pemasangan Tanpa Spasi)
dibuat 16 Mei 2017 pengganti analisa A. 4.4.1.24.rob
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.300 80,000.00 24,000.00
Tukang batu L.02 OH 0.150 110,000.00 16,500.00
Kepala tukang L.03 OH 0.015 120,000.00 1,800.00
Mandor L.04 OH 0.015 120,000.00 1,800.00
JUMLAH TENAGA KERJA 44,100.00
B BAHAN
Bata Berongga ekspose buah 83.000 2,990.00 248,170.00
Semen Portland Kg 19.000 1,633.00 31,027.00
Pasir pasang m3 0.032 222,812.50 7,130.00
JUMLAH HARGA BAHAN 286,327.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 330,427.00


E Overhead & Profit 15.00% 49,564.05
F Harga Satuan Pekerjaan (D+E) 379,991.05
A.4.5.2.1. rob1 ATAP BITUMEN SELULOSA MONOLAYER UK.195 X 96 CM
dibuat 13 Juni 2017
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.140 80,000.00 11,200.00
Tukang batu L.02 OH 0.070 110,000.00 7,700.00
Kepala tukang L.03 OH 0.007 120,000.00 840.00
Mandor L.04 OH 0.007 120,000.00 840.00
JUMLAH TENAGA KERJA 20,580.00
B BAHAN
Atap Selulosa 0.650 172,500.00 112,125.00
Paku/Screw 12.000 1,380.00 16,560.00
JUMLAH HARGA BAHAN 128,685.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 149,265.00


E Overhead & Profit 15.00% 22,389.75
F Harga Satuan Pekerjaan (D+E) 171,654.75

NOK/BUBUNGAN UNTUK ATAP SELULOSA MONOLAYER


A.4.5.2.1. rob2 (SAMPING)

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.084 80,000.00 6,720.00
Tukang batu L.02 OH 0.125 110,000.00 13,750.00
Kepala tukang L.03 OH 0.130 120,000.00 15,600.00
Mandor L.04 OH 0.004 120,000.00 480.00
JUMLAH TENAGA KERJA 36,550.00
B BAHAN
Nok Selulosa 1.042 94,875.00 98,859.75
Paku/Screw 8.330 1,380.00 11,495.40
JUMLAH HARGA BAHAN 110,355.15
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 146,905.15


E Overhead & Profit 15.00% 22,035.77
F Harga Satuan Pekerjaan (D+E) 168,940.92
A.4.5.2.1. rob3 ATAP BITUMEN SELULOSA MONOLAYER UK. 106 X 40 CM

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.200 80,000.00 16,000.00
Tukang batu L.02 OH 0.100 110,000.00 11,000.00
Kepala tukang L.03 OH 0.010 120,000.00 1,200.00
Mandor L.04 OH 0.001 120,000.00 120.00
JUMLAH TENAGA KERJA 28,320.00
B BAHAN
Atap Selulosa 3.230 58,075.00 187,582.25
Paku/Screw 16.150 1,380.00 22,287.00
JUMLAH HARGA BAHAN 209,869.25
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 238,189.25


E Overhead & Profit 15.00% 35,728.39
F Harga Satuan Pekerjaan (D+E) 273,917.64

A.4.5.2.1. rob4 NOK/BUBUNG UNTUK ATAP SELULOSA MONOLAYER (ATAS)

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.084 80,000.00 6,720.00
Tukang batu L.02 OH 0.125 110,000.00 13,750.00
Kepala tukang L.03 OH 0.130 120,000.00 15,600.00
Mandor L.04 OH 0.004 120,000.00 480.00
JUMLAH TENAGA KERJA 36,550.00
B BAHAN
Nok Selulosa 1.300 101,200.00 131,560.00
Paku/Screw 10.000 1,380.00 13,800.00
JUMLAH HARGA BAHAN 145,360.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 181,910.00


E Overhead & Profit 15.00% 27,286.50
F Harga Satuan Pekerjaan (D+E) 209,196.50
A.4.5.2.1. rob5 1m2 Pasang Atap Bitumen Bergelombang Monolayer 3 mm
( kemiringan atap Minimum 10o - 15o ) Uk. 200 x 95 x 0.30 cm,
Jarak Rangka Gording atau Reng max. 45 cm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.140 80,000.00 11,200.00
Tukang batu L.02 OH 0.070 110,000.00 7,700.00
Kepala tukang L.03 OH 0.007 120,000.00 840.00
Mandor L.04 OH 0.007 120,000.00 840.00
JUMLAH TENAGA KERJA 20,580.00
B BAHAN
Atap Bitumen Bergelombang Monolayer 3 mm 0.650 189,175.00 122,963.75
Paku atau Sekrup 9.100 1,380.00 12,558.00
JUMLAH HARGA BAHAN 135,521.75
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 156,101.75


E Overhead & Profit 15.00% 23,415.26
F Harga Satuan Pekerjaan (D+E) 179,517.01

Sumber, 2020

Kepala Dinas Perumahan, Kawasan Permukiman


Dan Pertanahan Kabupaten Cirebon

H. SUKMA NUGRAHA, SH.,MM.


NIP. 19610301 198603 1 012
1 m3 Angkutan Bahan Material Jarak Angkut Setiap 100 m

Kode Analisa T.15.a.6

Harga Satuan Jumlah Harga


No Uraian Satuan Koefisien
( Rp. ) ( Rp. )
1 2 3 4 5 6=4x5
A. TENAGA
1 Pekerja OH 0.6000 80,000.00 48,000.00
3 Mandor OH 0.0300 120,000.00 3,600.00
JUMLAH TENAGA KERJA 51,600.00
B. BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN

JUMLAH HARGA PERALATAN -

D Jumlah harga tenaga, bahan dan peralatan (A + B + C) 51,600.00


E Overhead & profit 15 % X D 7,740.00
F Harga satuan pekerjaan (D + E) 59,340.00
G Dibulatkan 59,340.00
Keterangan :

1 m2 Tebas Tebang Berupa Memotong dan Membersihkan Lokasi dari Tanaman/Tumbuhan dia
< 15 cm
Kode Analisa T.02

Harga Satuan Jumlah Harga


No Uraian Satuan Koefisien
( Rp. ) ( Rp. )
1 2 3 4 5 6=4x5
A. TENAGA
1 Pekerja OH 0.0750 80,000.00 6,000.00
3 Mandor OH 0.0075 120,000.00 900.00
JUMLAH TENAGA KERJA 6,900.00
B. BAHAN
1 Minyak tanah L 0.0100 11,787.50 117.88
JUMLAH HARGA BAHAN 117.88
C. PERALATAN

JUMLAH HARGA PERALATAN -

D Jumlah harga tenaga, bahan dan peralatan (A + B + C) 7,017.88


E Overhead & profit 15 % X D 1,052.68
F Harga satuan pekerjaan (D + E) 8,070.56
G Dibulatkan 8,070.00
Keterangan :