DINAS BINA MARGA, DINAS PENGELOLAAN SUMBER DAYA AIR & PERTAMBANGAN
DAN DINAS CIPTA KARYA & TATA RUANG
KABUPATEN CIREBON
TAHUN ANGGARAN 2014
II. PASIR
1 Pasir beton m3 150,000.00
2 Pasir aspal m3 150,000.00
3 Pasir pasang m3 143,000.00
4 Pasir urug m3 110,000.00
5 Sirtu m3 110,000.00
6 Sirtu tersaring m3 115,000.00
7 Tanah urug pilhan m3 125,000.00
8 Tanah urug biasa m3 100,000.00
III. BESI / PIPA / KAWAT
1 Besi WF/Besi Profil kg 11,250.00
2 Besi strip kg 11,250.00
3 Besi beton kg 11,000.00
4 Besi stainless dia. 0,5" m' 38,000.00
5 Besi stainless dia. 1" m' 60,000.00
6 Besi stainless dia. 1,5" m' 75,000.00
7 Besi stainless dia. 2" m' 80,000.00
8 Besi stainless dia. 2,5" m' 125,000.00
9 Besi stainless dia. 3" m' 152,000.00
10 Besi galvanis dia. 0.5" m' 25,000.00
11 Besi galvanis dia. 1" m' 27,000.00
12 Besi galvanis dia. 1.5" m' 45,000.00
13 Besi galvanis dia. 2" m' 57,000.00
14 Besi galvanis dia. 2.5" m' 80,500.00
15 Besi galvanis dia. 3" m' 96,000.00
16 Besi biasa dia. 2" btg 250,000.00
17 Besi biasa dia. 3" btg 310,000.00
18 Dop besi Ø 3 " bh 60,000.00
19 Kawat beton / Kawat tali kg 18,000.00
20 Kawat bronjong dia. 4 mm kg 20,000.00
21 Kawat galvanis dia. 4 mm kg 20,000.00
22 Kawat galvanis dia. 6 mm kg 24,000.00
23 Kawat duri m' 20,000.00
24 Pipa besi galvanis 2" btg 324,000.00
25 Pipa besi galvanis 3" btg/6m' 600,000.00
26 Pipa PVC Ø 2" S-12,5 ( 8 - 10 bar ) m' 26,300.00
27 Pipa PVC Ø 3" S-12,5 ( 8 - 10 bar ) m' 53,600.00
28 Pipa PVC / paralon 2 inch btg 50,600.00
29 Pipa PVC / paralon 3 inch btg 75,000.00
30 Pipa Reducer PVC Ø 3"-4" bh 5,800.00
31 Pipa Knee/bend PVC Ø 3" bh 5,800.00
32 Plat baja tebal 5 mm - 20 mm kg 12,650.00
33 Ram kawat harmonika m2 23,200.00
34 Socket besi O 3 " bh 45,000.00
NO URAIAN BAHAN/MATERIAL SAT. HARGA KET
KESEPAKATAN
V. ASPAL
1 Aspal kemasan kg 10,785.00
2 Aspal curah kg 9,930.00
VI. MINYAK
1 Premium liter 4,500.00
2 Premium (non subsidi) liter 9,950.00
3 Solar liter 4,500.00
4 Solar (non subsidi) liter 8,500.00
5 Minyak tanah liter 9,000.00
6 Olie SAE 20, 40, 60, 80 dan 120 liter 35,000.00
7 Pelumas bekisting liter 10,000.00
8 Stempet kg 25,000.00
VII.CETAKAN
1 Bata merah bh 600.00
2 Bata berongga bh 2,250.00
3 Genteng glazuur turbo ex Jatiwangi bh 2,500.00
4 Genteng nok/bubung diglazuur ex Jatiwangi bh 3,500.00
5 Genteng nok/bubung press mesin ex Jatiwangi bh 2,200.00
6 Genteng nok/bubung press tangan ex Jatiwangi bh 2,000.00
7 Genteng nok/bubung morando diglazuur bh 4,500.00
8 Genteng nok/bubung morando bh 4,000.00
9 Genteng press diglazuur ex Jatiwangi bh 2,000.00
10 Genteng press mesin ex Jatiwangi bh 1,900.00
11 Genteng press tangan ex Jatiwangi bh 1,400.00
12 Genteng Type Viktoria bh 9,000.00
13 Genteng nok/bubung Type Viktoria bh 12,500.00
14 Genteng nok/bubung ujung Type Viktoria bh 20,000.00
15 Genteng nok/bubung ujung pertigaan Type Viktoria bh 25,000.00
16 Genteng beton bh 5,000.00
17 Genteng metal m2 75,000.00
18 Gorong-gorong buis beton dia. 100 cm bh/0,5 m' 120,000.00
19 Gorong-gorong buis beton dia. 80 cm bh/0,5 m' 100,000.00
20 Gorong-gorong buis beton dia. 60 cm bh/m' 70,000.00
21 Gorong-gorong buis beton dia. 40 cm bh/m' 60,000.00
22 Gorong-gorong buis beton dia. 30 cm bh/m' 50,000.00
23 Gorong-gorong buis beton dia. 20 cm bh/m' 40,000.00
24 Gravel dia. 60 cm bh 38,000.00
25 Gravel dia. 40 cm bh 35,000.00
26 Gravel dia. 20 cm bh 20,000.00
27 Nok steel gelombang 1050 x 5 mm m' 23,000.00
28 Nok steel gelombang 920 x 5 mm m' 22,500.00
29 Nok / bubung genteng beton bh 6,000.00
30 Paving Block K.175 Segi Enam bh 1,500.00
31 Paving Block K.175 Persegi bh 2,000.00
32 Paving Block K.125 Segi Enam bh 1,250.00
NO URAIAN BAHAN/MATERIAL SAT. HARGA KET
KESEPAKATAN
33 Paving Block K.125 Persegi bh 1,600.00
34 Digital printing m2 25,000.00
NO URAIAN BAHAN/MATERIAL SAT. HARGA KET
KESEPAKATAN
VIII. KAYU
1 Bambu Ø6 - Ø8 / 6 m btg 14,000.00
2 Kayu deplank 8/20 - 4 m (Jati Jateng) m3 8,000,000.00
3 Kayu deplank 8/20 - 4 m (Balau) m3 7,500,000.00
4 Kayu deplank 8/20 - 4 m (Borneo) m3 4,500,000.00
5 Kayu dolken O 8 - 10 /4 m btg 57,000.00
6 Kayu dolken O 12 - 15 /4 m btg 60,000.00
7 Kayu dolken O 5 /3 m btg 35,000.00
8 Kayu hutan/kayu perancah acuan m3 4,255,000.00
9 Kayu kamper m3 8,200,000.00
10 Kayu kaso 5/7 meranti m3 5,000,000.00
11 Kayu kaso 5/7 meranti btg 79,000.00
12 Kayu kruing m3 7,274,000.00
13 Kayu lanan m3 6,546,000.00
14 Kayu meranti m3 5,000,000.00
15 Kayu jati Jabar m3 7,500,000.00
16 Kayu Balau m3 7,500,000.00
17 Kayu Borneo m3 4,500,000.00
18 Kayu bakar m3 90,000.00
19 Reng kayu borneo ukuran 2/3 cm btg 54,000.00
20 Tali Ijuk kg 9,000.00
B. UPAH
1 Mandor /hari 70,000.00
2 Kepala tukang /hari 65,000.00
3 Tukang kayu / besi /hari 60,000.00
4 Tukang batu /hari 60,000.00
5 Pembantu tukang /hari 50,000.00
6 Operator terlatih /hari 60,000.00
7 Operator kurang terlatih /hari 55,000.00
8 Pembantu operator /hari 50,000.00
9 Supir truk /hari 55,000.00
10 Pembantu supir /hari 50,000.00
11 Buruh lapangan terlatih /hari 55,000.00
12 Buruh lapangan kurang terlatih /hari 50,000.00
13 Buruh lapangan tak terlatih / pekerja /hari 50,000.00
II. PASIR
1 Pasir beton m3 178,000.00
2 Pasir aspal m3 150,000.00
3 Pasir pasang m3 145,000.00
4 Pasir urug m3 140,000.00
5 Sirtu m3 140,000.00
6 Sirtu tersaring m3 145,000.00
7 Tanah urug pilhan m3 125,000.00
8 Tanah urug biasa m3 100,000.00
III. BESI / PIPA / KAWAT
1 Besi WF/Besi Profil kg 12,500.00
2 Besi strip kg 12,500.00
3 Besi beton kg 11,000.00
4 Besi stainless dia. 0,5" m' 38,000.00
5 Besi stainless dia. 1" m' 60,000.00
6 Besi stainless dia. 1,5" m' 75,000.00
7 Besi stainless dia. 2" m' 80,000.00
8 Besi stainless dia. 2,5" m' 125,000.00
9 Besi stainless dia. 3" m' 152,000.00
10 Besi galvanis dia. 0.5" m' 25,000.00
11 Besi galvanis dia. 1" m' 27,000.00
12 Besi galvanis dia. 1.5" m' 45,000.00
13 Besi galvanis dia. 2" m' 57,000.00
14 Besi galvanis dia. 2.5" m' 80,500.00
15 Besi galvanis dia. 3" m' 96,000.00
16 Besi biasa dia. 2" btg 250,000.00
17 Besi biasa dia. 3" btg 310,000.00
18 Dop besi Ø 3 " bh 60,000.00
19 Kawat beton / Kawat tali kg 18,000.00
20 Kawat bronjong dia. 4 mm kg 20,000.00
21 Kawat galvanis dia. 4 mm kg 20,000.00
22 Kawat galvanis dia. 6 mm kg 24,000.00
23 Kawat duri m' 14,000.00
24 Pipa besi galvanis 2" btg 324,000.00
25 Pipa besi galvanis 3" btg/6m' 500,000.00
26 Pipa PVC Ø 2" S-12,5 ( 8 - 10 bar ) m' 26,300.00
27 Pipa PVC Ø 3" S-12,5 ( 8 - 10 bar ) m' 53,600.00
28 Pipa PVC / paralon 2 inch btg 65,000.00
29 Pipa PVC / paralon 3 inch btg 90,000.00
30 Pipa Reducer PVC Ø 3"-4" bh 6,000.00
NO URAIAN BAHAN/MATERIAL SAT. HARGA KET
KESEPAKATAN
31 Pipa Knee/bend PVC Ø 3" bh 6,000.00
32 Plat baja tebal 5 mm - 20 mm kg 12,650.00
33 Ram kawat harmonika m2 23,000.00
34 Socket besi O 3 " bh 45,000.00
35 Toren Penguin 250 lt bh 525,000.00
36 Toren 500 lt bh 860,000.00
37 Toren 1000 lt bh 1,450,000.00
V. ASPAL
1 Aspal kemasan kg 11,300.00
2 Aspal curah kg 11,100.00
VI. MINYAK
1 Premium liter 6,500.00
2 Premium (non subsidi) liter 9,600.00
3 Solar liter 6,500.00
4 Solar (non subsidi) liter 10,400.00
5 Minyak tanah liter 10,300.00
6 Olie SAE 20, 40, 60, 80 dan 120 liter 35,000.00
7 Pelumas bekisting liter 10,000.00
8 Stempet kg 25,000.00
NO URAIAN BAHAN/MATERIAL SAT. HARGA KET
KESEPAKATAN
VII.CETAKAN
1 Bata merah bh 650.00
2 Bata berongga bh 2,400.00
3 Batako bh 3,200.00
4 Genteng glazuur turbo ex Jatiwangi bh 2,500.00
5 Genteng nok/bubung diglazuur ex Jatiwangi bh 3,500.00
6 Genteng nok/bubung press mesin ex Jatiwangi bh 2,200.00
7 Genteng nok/bubung press tangan ex Jatiwangi bh 2,000.00
8 Genteng nok/bubung morando diglazuur bh 4,500.00
9 Genteng morando bh 3,500.00
10 Genteng nok/bubung morando bh 4,000.00
11 Genteng press diglazuur ex Jatiwangi bh 2,500.00
12 Genteng press mesin ex Jatiwangi bh 1,900.00
13 Genteng press tangan ex Jatiwangi bh 1,400.00
14 Genteng Type Viktoria bh 9,000.00
15 Genteng nok/bubung Type Viktoria bh 12,500.00
16 Genteng nok/bubung ujung Type Viktoria bh 20,000.00
17 Genteng nok/bubung ujung pertigaan Type Viktoria bh 25,000.00
18 Genteng beton bh 5,000.00
19 Genteng metal 70 x 80 cm lbr 48,000.00
20 Gorong-gorong buis beton dia. 100 cm bh/0,5 m' 120,000.00
21 Gorong-gorong buis beton dia. 80 cm bh/0,5 m' 100,000.00
22 Gorong-gorong buis beton dia. 60 cm bh/m' 80,000.00
23 Gorong-gorong buis beton dia. 40 cm bh/m' 60,000.00
24 Gorong-gorong buis beton dia. 30 cm bh/m' 50,000.00
25 Gorong-gorong buis beton dia. 20 cm bh/m' 40,000.00
26 Gravel dia. 60 cm bh 40,000.00
27 Gravel dia. 40 cm bh 35,000.00
28 Gravel dia. 20 cm bh 25,000.00
29 Nok steel gelombang 1050 x 5 mm m' 29,000.00
30 Nok steel gelombang 920 x 5 mm m' 22,500.00
31 Nok / bubung genteng beton bh 6,000.00
32 Paving Block K.175 Segi Enam Netural tebal 8 cm m2 62,000.00
33 Paving Block K.175 Segi Enam motif tebal 8 cm m2 64,000.00
34 Paving Block K.175 Segi Enam warna tebal 8 cm m2 69,000.00
35 Paving Block K.175 Segi Enam Netural tebal 7 cm m2 55,000.00
36 Paving Block K.175 Segi Enam motif tebal 7 cm m2 58,000.00
37 Paving Block K.175 Segi Enam warna tebal 7 cm m2 64,000.00
38 Paving Block K.175 Segi Enam Netural tebal 6 cm m2 50,000.00
39 Paving Block K.175 Segi Enam motif tebal 6 cm m2 53,000.00
40 Paving Block K.175 Segi Enam warna tebal 6 cm m2 57,000.00
41 Paving Block K.125 Segi Enam Netural tebal 6 cm bh 43,000.00
42 Paving Block K.125 Segi Enam warna tebal 6 cm bh 47,000.00
43 Digital printing m2 25,000.00
VIII. KAYU
1 Bambu Ø6 - Ø8 / 6 m btg 17,000.00
2 Kayu deplank 8/20 - 4 m (Jati Jateng) m3 8,000,000.00
3 Kayu deplank 8/20 - 4 m (Balau) m3 9,500,000.00
4 Kayu deplank 8/20 - 4 m (Borneo) m3 5,000,000.00
5 Kayu dolken O 8 - 10 /4 m btg 60,000.00
6 Kayu dolken O 12 - 15 /4 m btg 68,000.00
7 Kayu dolken O 5 /3 m btg 12,500.00
8 Kayu hutan/kayu perancah acuan m3 4,255,000.00
9 Kayu kamper m3 8,200,000.00
10 Kayu kaso 5/7 meranti m3 6,000,000.00
11 Kayu kaso 5/7 meranti btg 79,000.00
12 Kayu kruing m3 7,274,000.00
13 Kayu lanan m3 6,546,000.00
14 Kayu meranti m3 6,000,000.00
15 Kayu jati Jabar m3 8,200,000.00
16 Kayu Balau m3 9,500,000.00
17 Kayu Borneo m3 5,000,000.00
18 Kayu bakar m3 90,000.00
19 Reng kayu borneo ukuran 2/3 cm btg 54,000.00
20 Tali Ijuk kg 9,000.00
NO URAIAN BAHAN/MATERIAL SAT. HARGA KET
KESEPAKATAN
B. UPAH
1 Mandor /hari 85,000.00
2 Kepala tukang /hari 75,000.00
3 Tukang kayu / besi /hari 70,000.00
4 Tukang batu /hari 70,000.00
5 Pembantu tukang /hari 55,000.00
6 Operator terlatih /hari 100,000.00
7 Operator kurang terlatih /hari 55,000.00
8 Pembantu operator /hari 50,000.00
9 Supir truk /hari 55,000.00
10 Pembantu supir /hari 50,000.00
11 Mekanik /hari 55,000.00
12 Pembantu mekanik /hari 50,000.00
13 Buruh lapangan terlatih /hari 55,000.00
14 Buruh lapangan kurang terlatih /hari 50,000.00
15 Buruh lapangan tak terlatih / pekerja /hari 55,000.00
DINAS BINA MARGA DINAS CIPTA KARYA DAN TATA RUANG DINAS PENGELOLAAN SUMBER DAYA AIR
KABUPATEN CIREBON KABUPATEN CIREBON DAN PERTAMBANGAN KAB.CIREBON
Kepala Seksi Perencanaan Teknik
Kepala Seksi Desain Teknik Kepala Seksi Bangunan Gedung
Jalan dan Jembatan
Kepala Bidang Bina Teknik Kepala Bidang Bangunan Gedung, Perumahan dan Kepala Bidang Bina Teknik
Permukiman
Kepala Dinas Bina Marga Kepala Dinas Cipta Karya dan Tata Ruang Kepala Dinas Pengelolaan Sumber Daya Air
Kabupaten Cirebon Kabupaten Cirebon dan Pertambangan Kabupaten Cirebon
Ir. AVIP SUHERDIAN, MT Ir. H. ARIEF BUDI PRAYITNO DEDI NURUL SUDJUDI A
NIP. 19640827 199303 1 006 NIP. 19620428 199003 1 006 NIP. 19590721 198303 1 009
DAFTAR KESEPAKATAN HARGA SATUAN BAHAN / MATERIAL DAN UPAH
DINAS BINA MARGA, DINAS PENGELOLAAN SUMBER DAYA AIR & PERTAMBANGAN
DAN DINAS CIPTA KARYA & TATA RUANG
KABUPATEN CIREBON
HARGA TERTINGGI TAHUN ANGGARAN 2015
kesimpulan
NO URAIAN BAHAN/MATERIAL SAT. HARGA TERTINGGI 2015 HARGA TERTINGGI 2015 harga survay
HARGA DASAR + 10 % tertinggi
A. BAHAN :
I. BATU
1 Abu Batu m3 185,850.00 204,400.00
2 Atras ( tanah urug ) m3 125,000.00 137,500.00
3 Base course A m3
4 Base course B m3
5 Batu apung kg 4,300.00 4,700.00
6 Batu belah 10/15 cm m3 175,000.00 192,500.00
7 Batu belah 15/20 cm (Krakal) m3 175,000.00 192,500.00
8 Batu pecah mesin 0.5-1 cm m3 200,000.00 220,000.00
9 Batu pecah mesin 1-2 cm m3 200,000.00 220,000.00
10 Batu pecah mesin 2-3 cm m3 200,000.00 220,000.00
11 Batu pecah mesin 3-5 cm 182,000.00 200,200.00
12 Batu tempel Palimanan 10 X 20 bh 1,500.00 1,650.00
13 Batu tempel kapur tekstur tidak rata bh 2,000.00 2,200.00
14 Chipping m3 245,300.00 269,800.00
15 Filler kg 100.00 100.00
16 Kapur bakar m3 70,000.00 77,000.00
17 Kapur Sirih kg 2,000.00 2,200.00
18 Kerikil m3 65,000.00 71,500.00
II. PASIR
1 Pasir beton m3 179,000.00 196,900.00
2 Pasir aspal m3 175,000.00 192,500.00
3 Pasir pasang m3 162,000.00 178,200.00
4 Pasir urug m3 150,000.00 165,000.00
5 Sirtu m3 145,000.00 159,500.00
6 Sirtu tersaring m3 147,000.00 161,700.00
7 Tanah urug pilhan m3 125,000.00 137,500.00
8 Tanah urug biasa m3 100,000.00 110,000.00
Tanah merah m3 112,500.00 123,750.00
III. BESI / PIPA / KAWAT
1 Besi WF/Besi Profil kg 13,750.00 15,125.00
2 Besi strip kg 13,750.00 15,125.00
3 Besi beton kg 13,000.00 14,300.00
4 Besi stainless dia. 0,5" m' 38,000.00 41,800.00
5 Besi stainless dia. 1" m' 60,000.00 66,000.00
6 Besi stainless dia. 1,5" m' 75,000.00 82,500.00
7 Besi stainless dia. 2" m' 80,000.00 88,000.00
8 Besi stainless dia. 2,5" m' 125,000.00 137,500.00
9 Besi stainless dia. 3" m' 152,000.00 167,200.00
10 Besi galvanis dia. 0.5" m' 25,000.00 27,500.00
11 Besi galvanis dia. 1" m' 27,000.00 29,700.00
12 Besi galvanis dia. 1.5" m' 45,000.00 49,500.00
13 Besi galvanis dia. 2" m' 57,000.00 62,700.00
14 Besi galvanis dia. 2.5" m' 80,500.00 88,550.00
15 Besi galvanis dia. 3" m' 84,000.00 92,400.00
16 Besi biasa dia. 2" btg 250,000.00 275,000.00
17 Besi biasa dia. 3" btg 310,000.00 341,000.00
18 Dop besi Ø 3 " bh 60,000.00 66,000.00
19 Kawat beton / Kawat tali kg 18,000.00 19,800.00
20 Kawat bronjong pabrikan dia. 3 mm (uk 2x1x0.5) unit 388,080.00 426,888.00
21 Kawat bronjong dia. 4 mm kg 20,000.00 22,000.00
22 Kawat galvanis dia. 4 mm kg 20,000.00 22,000.00
23 Kawat galvanis dia. 6 mm kg 24,000.00 26,400.00
24 Kawat duri m' 14,000.00 15,400.00
25 Pipa besi galvanis 2" btg/6m' 324,000.00 356,400.00
26 Pipa besi galvanis 3" btg/6m' 500,000.00 550,000.00
27 Pipa PVC Ø 2" S-12,5 ( 8 - 10 bar ) m' 26,300.00 28,900.00
28 Pipa PVC Ø 3" S-12,5 ( 8 - 10 bar ) m' 53,600.00 58,900.00
29 Pipa PVC / paralon 2 inch btg 69,000.00 75,900.00
30 Pipa PVC / paralon 3 inch btg 90,000.00 99,000.00
31 Pipa Reducer PVC Ø 3"-4" bh 6,000.00 6,600.00
kesimpulan
NO URAIAN BAHAN/MATERIAL SAT. HARGA TERTINGGI 2015 HARGA TERTINGGI 2015 harga survay
HARGA DASAR + 10 % tertinggi
32 Pipa Knee/bend PVC Ø 3" bh 6,000.00 6,600.00
33 Plat baja tebal 5 mm - 20 mm kg 13,000.00 14,300.00
34 Ram kawat harmonika m2 25,000.00 27,500.00
35 Socket besi O 3 " bh 45,000.00 49,500.00
36 Toren Penguin 250 lt bh 525,000.00 577,500.00
37 Toren 500 lt bh 860,000.00 946,000.00
38 Toren 1000 lt bh 1,450,000.00 1,595,000.00
39 Sling Ø 32 mm m 300,000.00 330,000.00
40 Sling Ø 16 mm m 175,000.00 192,500.00
41 Klem sling Ø 32 mm set 250,000.00 275,000.00
42 Warfel / jarum keras Ø 32 mm bh 200,000.00 220,000.00
43 Causen sling Ø 32 mm bh 85,000.00 93,500.00
44 Klem kokat sling Ø 32 mm bh 210,000.00 231,000.00
45 Segel sling Ø 32 mm bh 250,000.00 275,000.00
46 Warfel sling Ø 16 mm bh 135,000.00 148,500.00
47 Segel sling Ø 16 mm bh 140,000.00 154,000.00
48 Klem kokat sling Ø 16 mm bh 35,000.00 38,500.00
49 Causen sling Ø 16 mm bh 50,000.00 55,000.00
50 Jarum keras Ø 16 mm bh 75,000.00 82,500.00
V. ASPAL
1 Aspal kemasan kg 12,100.00 12,100.00
2 Aspal curah kg 11,600.00 11,600.00
3 Aspal Emulsi ltr 10,500.00 10,500.00
VI. MINYAK
1 Premium liter 6,500.00 6,500.00
2 Premium (non subsidi) liter 11,400.00 11,400.00
3 Solar liter 5,500.00 5,500.00
4 Solar (non subsidi) liter 11,900.00 11,900.00
5 Minyak tanah liter 12,500.00 12,500.00
6 Olie SAE 20, 40, 60, 80 dan 120 liter 42,000.00 42,000.00
7 Pelumas bekisting liter 10,000.00 10,000.00
8 Stempet kg 25,000.00 25,000.00
kesimpulan
NO URAIAN BAHAN/MATERIAL SAT. HARGA TERTINGGI 2015 HARGA TERTINGGI 2015 harga survay
HARGA DASAR + 10 % tertinggi
VII.CETAKAN
1 Bata merah bh 800.00 900.00
2 Bata berongga bh 2,400.00 2,650.00
3 Batako bh 3,200.00 3,500.00
4 Genteng glazuur turbo ex Jatiwangi bh 3,500.00 3,850.00
5 Genteng nok/bubung diglazuur ex Jatiwangi bh 4,000.00 4,400.00
6 Genteng nok/bubung press mesin ex Jatiwangi bh 2,500.00 2,750.00
7 Genteng nok/bubung press tangan ex Jatiwangi bh 2,000.00 2,200.00
8 Genteng nok/bubung morando diglazuur bh 4,500.00 4,950.00
9 Genteng morando bh 3,500.00 3,850.00
10 Genteng nok/bubung morando bh 4,000.00 4,400.00
11 Genteng press diglazuur ex Jatiwangi bh 2,500.00 2,750.00
12 Genteng press mesin ex Jatiwangi bh 1,900.00 2,100.00
13 Genteng press tangan ex Jatiwangi bh 1,400.00 1,550.00
14 Genteng Type Viktoria bh 9,000.00 9,900.00
15 Genteng nok/bubung Type Viktoria bh 12,500.00 13,750.00
16 Genteng nok/bubung ujung Type Viktoria bh 20,000.00 22,000.00
17 Genteng nok/bubung ujung pertigaan Type Viktoria bh 25,000.00 27,500.00
18 Genteng beton bh 5,000.00 5,500.00
19 Genteng metal 70 x 80 cm lbr 48,000.00 52,800.00
20 Gorong-gorong buis beton dia. 100 cm bh/0,5 m' 150,000.00 165,000.00
21 Gorong-gorong buis beton dia. 80 cm bh/0,5 m' 130,000.00 143,000.00
22 Gorong-gorong buis beton dia. 60 cm bh/m' 140,000.00 154,000.00
23 Gorong-gorong buis beton dia. 40 cm bh/m' 100,000.00 110,000.00
24 Gorong-gorong buis beton dia. 30 cm bh/m' 80,000.00 88,000.00
25 Gorong-gorong buis beton dia. 20 cm bh/m' 60,000.00 66,000.00
26 Kansten Cetak 82,500.00 90,750.00
27 Gravel dia. 60 cm bh 75,000.00 82,500.00
28 Gravel dia. 40 cm bh 45,000.00 49,500.00
29 Gravel dia. 20 cm bh 35,000.00 38,500.00
30 Nok steel gelombang 1050 x 5 mm m' 29,000.00 31,900.00
31 Nok steel gelombang 920 x 5 mm m' 22,500.00 24,750.00
32 Nok / bubung genteng beton bh 6,000.00 6,600.00
33 Paving Block K.175 Segi Enam Netural tebal 8 cm m2 62,000.00 68,200.00
34 Paving Block K.175 Segi Enam motif tebal 8 cm m2 64,000.00 70,400.00
35 Paving Block K.175 Segi Enam warna tebal 8 cm m2 69,000.00 75,900.00
36 Paving Block K.175 Segi Enam Netural tebal 7 cm m2 55,000.00 60,500.00
37 Paving Block K.175 Segi Enam motif tebal 7 cm m2 58,000.00 63,800.00
38 Paving Block K.175 Segi Enam warna tebal 7 cm m2 64,000.00 70,400.00
39 Paving Block K.175 Segi Enam Netural tebal 6 cm m2 50,000.00 55,000.00
40 Paving Block K.175 Segi Enam motif tebal 6 cm m2 53,000.00 58,300.00
41 Paving Block K.175 Segi Enam warna tebal 6 cm m2 57,000.00 62,700.00
42 Paving Block K.125 Segi Enam Netural tebal 6 cm bh 43,000.00 47,300.00
43 Paving Block K.125 Segi Enam warna tebal 6 cm bh 47,000.00 51,700.00
44 Tiang pancang beton Pratekan m3 4,600,000.00 5,060,000.00
45 Digital printing m2 25,000.00 27,500.00
VIII. KAYU
1 Bambu Ø6 - Ø8 / 6 m btg 17,000.00 18,700.00
2 Kayu deplank 8/20 - 4 m (Jati Jateng) m3 9,800,000.00 10,780,000.00
3 Kayu deplank 8/20 - 4 m (Balau) m3 9,500,000.00 10,450,000.00
4 Kayu deplank 8/20 - 4 m (Borneo) m3 5,000,000.00 5,500,000.00
5 Kayu dolken O 8 - 10 /4 m btg 60,000.00 66,000.00
6 Kayu dolken O 12 - 15 /4 m btg 68,000.00 74,800.00
7 Kayu dolken O 5 /3 m btg 12,500.00 13,750.00
8 Kayu hutan/kayu perancah acuan m3 4,700,000.00 5,170,000.00
9 Kayu kamper m3 8,200,000.00 9,020,000.00
10 Kayu kaso 5/7 meranti m3 6,000,000.00 6,600,000.00
11 Kayu kaso 5/7 meranti btg 79,000.00 86,900.00
12 Kayu kruing m3 7,274,000.00 8,001,400.00
13 Kayu lanan m3 6,546,000.00 7,200,600.00
14 Kayu meranti m3 6,000,000.00 6,600,000.00
15 Kayu jati Jabar m3 8,200,000.00 9,020,000.00
16 Kayu Balau m3 9,500,000.00 10,450,000.00
17 Kayu Borneo m3 5,000,000.00 5,500,000.00
18 Kayu bakar m3 90,000.00 99,000.00
19 Reng kayu borneo ukuran 2/3 cm btg 54,000.00 59,400.00
20 Tali Ijuk kg 9,000.00 9,900.00
kesimpulan
NO URAIAN BAHAN/MATERIAL SAT. HARGA TERTINGGI 2015 HARGA TERTINGGI 2015 harga survay
HARGA DASAR + 10 % tertinggi
B. UPAH
1 Mandor /hari 85,000.00 85,000.00
2 Kepala tukang /hari 75,000.00 75,000.00
3 Tukang kayu / besi /hari 70,000.00 70,000.00
4 Tukang batu /hari 70,000.00 70,000.00
5 Pembantu tukang /hari 55,000.00 55,000.00
6 Operator terlatih /hari 100,000.00 100,000.00
7 Operator kurang terlatih /hari 55,000.00 55,000.00
8 Pembantu operator /hari 50,000.00 50,000.00
9 Supir truk /hari 55,000.00 55,000.00
10 Pembantu supir /hari 50,000.00 50,000.00
11 Mekanik /hari 55,000.00 55,000.00
12 Pembantu mekanik /hari 50,000.00 50,000.00
13 Buruh lapangan terlatih /hari 55,000.00 55,000.00
14 Buruh lapangan kurang terlatih /hari 50,000.00 50,000.00
15 Buruh lapangan tak terlatih / pekerja /hari 55,000.00 55,000.00
Kepala Bidang Bina Teknik Kepala Bidang Bangunan Gedung, Kepala Bidang Bina Teknik
Perumahan dan Permukiman
Ir. TETI MEIRAWATI Ir. FELLYANTO TAMZIL, MM AGUNG GUMILANG, SS., M.si
NIP. 19670502 199703 2 004 NIP. 19620428 199003 1 006 NIP. 19711224 199803 1 004
Kepala Dinas Bina Marga Kepala Dinas Cipta Karya dan Tata Kepala Dinas Pengelolaan Sumber Daya Air
Kabupaten Cirebon Ruang dan Pertambangan Kabupaten Cirebon
Kabupaten Cirebon
HARGA SATUAN
NO KODE ANALISA SATUAN PEKERJAAN
Rp
Untuk pekerjaan beton pracetak yang bisa diangkat 24 jam diperlukan penambahan bahan tambahan 2,346,565.56
54 A.4.1.1.13 Membuat 1 m3 beton kedap air dengan strorox – 100 1,475,875.50
55 A.4.1.1.14 Pemasangan 1 m’ PVC Waterstop lebar 150 mm 79,574.25
56 A.4.1.1.15 Pemasangan 1 m’ PVC Waterstop lebar 200 mm 185,963.63
57 A.4.1.1.16 Membuat 1 m’ PVC Waterstop lebar 230 mm – 320 mm 173,215.88
58 A.4.1.1.17 Pembesian 10 kg dengan besi polos atau besi ulir 204,277.38
59 A.4.1.1.18 Pemasangan 10 kg kabel prategang (prestressed) polos/strands 197,179.00
60 A.4.1.1.19 Pemasangan 10 kg jaring kawat baja (wiremesh) 135,468.28
61 A.4.1.1.20 (K3) Pemasangan 1 m2 bekisting untuk pondasi 282,313.50
62 A.4.1.1.21 (K3) Pemasangan 1 m2 bekisting untuk sloof 305,457.25
63 A.4.1.1.22 (K3) Pemasangan 1 m2 bekisting untuk kolom 623,760.72
64 A.4.1.1.23 (K3) Pemasangan 1 m2 bekisting untuk balok 643,598.22
II - 19
HARGA SATUAN
NO KODE ANALISA SATUAN PEKERJAAN
Rp
65 A.4.1.1.24 (K3) Pemasangan 1 m2 bekisting untuk lantai 967,610.72
66 A.4.1.1.25 (K3) Pemasangan 1 m2 bekisting untuk dinding 791,718.22
67 A.4.1.1.26 (K3) Pemasangan 1 m2 bekisting untuk tangga 576,811.97
68 A.4.1.1.27 Pemasangan 1 m2 jembatan untuk pengecoran beton 202,969.25
69 A.4.1.1.35 Membuat 1 m’ kolom praktis beton bertulang (11 x 11) cm 119,727.36
70 A.4.1.1.36 Membuat 1 m’ ring balok beton bertulang (10 x 15) cm 138,745.63
II - 20
HARGA SATUAN
NO KODE ANALISA SATUAN PEKERJAAN
Rp
A.4.1.2 HARGA SATUAN PEKERJAAN BETON PRACETAK
71 A.4.1.2.1. (K3) Pembuatan 1 m2 lahan produksi tebal 8 cm beton f’c 14,5 MPa, slump (120 ± 20) mm 103,027.16
72 A.4.1.2.2. (K3) Pembuatan 1 m2 lahan produksi tebal 10 cm beton f’c 14,5 MPa, slump (120 ± 20) mm 128,812.69
73 A.4.1.2.3. (K3) Pembuatan 1 m2 lahan produksi tebal 12 cm beton f’c 14,5 MPa, slump (120 ± 20) mm 154,471.73
74 A.4.1.2.4. (K3) Pembuatan 1 m2 lahan produksi tebal 15 cm beton f’c 14,5 MPa, slump (120 ± 20) mm 193,207.54
75 A.4.1.2.5. Pembuatan 1 m2 bekisting untuk pelat beton pracetak ( 5 kali pakai) 188,636.30
76 A.4.1.2.6 Pembuatan 1 m2 bekisting untuk balok beton pracetak (10-12 kali pakai) 59,104.62
77 A.4.1.2.7.
A.4.1.2.8. Pembuatan 1 m2 bekisting untuk kolom beton pracetak (10-12 kali pakai) 54,112.18
78 Pemasangan dan membuka bekisting 1 buah komponen pelat beton pracetak 7,843.00
79 A.4.1.2.9. Pemasangan dan membuka bekisting 1 buah komponen balok beton pracetak 12,673.00
80 A.4.1.2.10. Pemasangan dan membuka bekisting 1 buah komponen kolom beton pracetak 10,258.00
81 A.4.1.2.11. Penuangan/menebar beton 1 m3 komponen untuk pelat pracetak 67,712.00
82 A.4.1.2.12. Penuangan/menebar beton 1 m3 komponen untuk balok pracetak 69,598.00
83 A.4.1.2.13. Penuangan/menebar beton 1 m3 komponen kolom pracetak 62,617.50
84 A.4.1.2.14. Ereksi 1 buah komponen untuk pelat pracetak 898,961.91
85 A.4.1.2.15. Ereksi 1 buah komponen untuk balok pracetak 857,408.92
86 A.4.1.2.16. Ereksi 1 buah komponen untuk kolom pracetak 1,442,576.19
87 A.4.1.2.17. Langsir 1 buah komponen untuk pelat pracetak ( ± 20 m) 124,788.26
88 A.4.1.2.18. Langsir 1 buah komponen untuk balok pracetak ( ± 20 m) 124,788.26
89 A.4.1.2.19. Langsir 1 buah komponen untuk kolom pracetak ( ± 20 m) 124,788.26
90 A.4.1.2.20. Bahan 1 m3 grout campuran 3,967,931.25
91 A.4.1.2.21. Bahan 1 m3 grout (tidak campuran) 5,906,400.00
92 A.4.1.2.22. Upah 1 titik pekerjaan grout pada joint beton pracetak 61,743.50
93 A.4.1.2.23. Pemasangan 1 titik bekisting joint pracetak 147,662.30
94 A.4.1.2.24. Upah 1 titik joint dengan sling 52,371.00
A.4.2.1 HARGA SATUAN PEKERJAAN BESI DAN ALUMUNIUM
95 A.4.2.1.1. Pemasangan 1 kg besi profil 35,644.25
96 A.4.2.1.2. Pemasangan 1 kg rangka kuda-kuda baja IWF 35,644.25
97 A.4.2.1.3. Pengerjaan 100 kg pekerjaan perakitan 153,803.88
98 A.4.2.1.4. Pembuatan 1 m2 pintu besi pelat baja tebal 2 mm rangkap, rangka baja siku 743,127.13
99 A.4.2.1.5. Pengerjaan 10 cm pengelasan dengan las listrik 50,098.89
100 A.4.2.1.6. Pembuatan 1 m2 rangka jendela besi scuare tube 476,916.83
101 A.4.2.1.7. Pemasangan 1 m2 pintu rolling door besi 1,570,348.00
102 A.4.2.1.8. Pemasangan 1 m2 pintu lipat (folding door) bahan plastik/PVC 3,689,223.00
103 A.4.2.1.9. Pemasangan 1 m2 sunscreen alluminium 629,314.50
104 A.4.2.1.10. Pemasangan 1 m2 rolling door alluminium 768,200.00
105 A.4.2.1.11. Pemasangan 1 m kusen pintu alluminium 172,946.20
106 A.4.2.1.12. Pemasangan 1 m2 pintu alluminium strip lebar 8 cm 2,591,265.10
107 A.4.2.1.13. Pemasangan 1 m2 pintu kaca rangka alluminium 741,531.50
108 A.4.2.1.14. Pemasangan 1 m2 venetions blinds dan vertical blinds 224,238.50
109 A.4.2.1.15. Pemasangan 1 m2 terali besi strip (2 x 3) mm 669,298.40
110 A.4.2.1.16. Pemasangan 1 m2 kawat nyamuk 493,446.38
111 A.4.2.1.17. Pemasangan 1 m2 jendela nako & tralis 416,593.83
112 A.4.2.1.18. Pemasangan 1 m’ talang datar/ jurai seng bjls 28 lebar 90 cm 187,708.75
113 A.4.2.1.19 Pemasangan 1 m talang ½ lingkaran D-15 cm, seng pelat bjls 30 lebar 45 cm 119,118.44
114 A.4.2.1.20. Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x 120 cm, untuk partisi 235,761.50
115 A.4.2.1.21. Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x 60 cm, untuk plafon 284,809.00
116 A.4.2.1.22. (K3) Pemasangan 1 m2 atap pelana rangka atap baja canai dingin profil C75 237,982.32
117 A.4.2.1.22. (K3) Pemasangan 1 m2 atap jurai rangka atap baja canai dingin profil C75 256,865.15
A.4.4.1 HARGA SATUAN PEKERJAAN PASANGAN DINDING
118 A. 4.4.1.1. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 2PP 334,489.58
119 A. 4.4.1.2. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 3PP 317,495.78
120 A. 4.4.1.3. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 4PP 305,989.37
121 A. 4.4.1.4. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 5PP 300,126.40
122 A. 4.4.1.5 Pemasangan 1m2 Dinding Bata Merah (5x11x22) cm tebal 1 batu campuran 1SP : 6PP 298,302.67
123 A. 4.4.1.6 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 3KP : 10PP 282,932.54
124 A. 4.4.1.7 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 2PP 161,474.06
125 A. 4.4.1.8 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 3PP 153,385.52
126 A.4.4.1.9 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP :4PP 148,764.50
127 A. 4.4.1.10 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP :5PP 145,859.10
128 A. 4.4.1.11 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 6PP 144,330.03
129 A. 4.4.1.12 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SP :8PP 141,168.39
130 A. 4.4.1.13 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SP : 3KP :10PP 141,776.74
131 A. 4.4.1.14 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SM : 1KP :1PP 126,033.12
132 A. 4.4.1.15 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SM : 1KP :2PP 127,424.15
133 A. 4.4.1.16 rob Pemasangan 1m2 dinding conblock HB20 campuran 1SP : 3PP 109,487.88
134 A. 4.4.1.17 rob Pemasangan 1m2 dinding conblock HB20 campuran 1SP : 4PP 113,809.79
135 A. 4.4.1.18 rob Pemasangan 1m2 dinding conblock HB15 campuran 1SP : 3PP 96,458.12
136 A. 4.4.1.19 rob Pemasangan 1 m2 dinding conblock HB15 campuran 1SP :4PP 96,425.48
137 A. 4.4.1.20 rob Pemasangan 1 m2 dinding conblock HB10 campuran 1SP :3PP 83,004.99
138 A. 4.4.1.21.rob Pemasangan 1 m2 dinding conblock HB10 campuran 1SP : 4PP 83,050.93
139 A. 4.4.1.22 Pemasangan 1 m2 dinding terawang (rooster) 12x11x24 campuran 1SP :3PP 169,925.65
140 A. 4.4.1.23 Pemasangan 1 cm2 dinding terawang (rooster) 12x11x24 campuran 1SP :4PP 169,925.65
141 A. 4.4.1.24.rob Pemasangan 1 m2 dinding bata berongga ekspose 5x11x23 campuran 1SP :3PP 279,564.08
142 A. 4.4.1.25 Pemasangan 1 m2 dinding bata ringan tebal 7,5 cm dengan mortar siap pakai 297,021.78
143 A. 4.4.1.26 Pemasangan 1m2 dinding bata ringan tebal 10 cm dengan mortar siap pakai 302,808.44
A.4.4.2 HARGA SATUAN PEKERJAAN PLESTERAN
144 A.4.4.2.1. Pemasangan 1 m2 plesteran 1SP : 1PP tebal 15 mm 83,930.49
145 A.4.4.2.2. Pemasangan 1 m2 plesteran 1SP : 2PP tebal 15 mm 75,039.85
146 A.4.4.2.3. Pemasangan 1 m2 plesteran 1SP : 3PP tebal 15mm 71,211.33
147 A.4.4.2.4. Pemasangan 1 m2 plesteran 1SP : 4PP tebal 15 mm 68,583.03
148 A.4.4.2.5. Pemasangan 1 m2 plesteran 1SP : 5PP tebal 15 mm 67,112.39
149 A.4.4.2.6. Pemasangan 1 m2 plesteran 1SP : 6PP tebal 15 mm 65,926.36
150 A.4.4.2.7. Pemasangan 1 m2 plesteran 1SP : 7PP tebal 15 mm 65,281.17
151 A.4.4.2.8. Pemasangan 1 m2 plesteran 1SP : 8PP tebal 15 mm 64,635.99
II - 21
HARGA SATUAN
NO KODE ANALISA SATUAN PEKERJAAN
Rp
152 A.4.4.2.9. Pemasangan 1 m2 plesteran 1SP : 1/2KP : 3PP tebal 15 mm 67,460.89
153 A.4.4.2.10. Pemasangan 1 m2 plesteran 1SP : 2KP : 8PP tebal 15 mm 64,653.29
154 A.4.4.2.11. Pemasangan 1 m2 plesteran 1SM : 1KP : 1PP tebal 15 mm 57,375.97
155 A.4.4.2.12. Pemasangan 1 m2 plesteran 1SM : 1KP : 2PP tebal 15 mm 58,328.96
156 A.4.4.2.13. Pemasangan 1 m2 plesteran 1SP : 1PP tebal 20 mm 100,414.54
II - 22
HARGA SATUAN
NO KODE ANALISA SATUAN PEKERJAAN
Rp
157 A.4.4.2.14. Pemasangan 1 m2 plesteran 1SP : 3PP tebal 20 mm 81,187.85
158 A.4.4.2.15. Pemasangan 1 m2 plesteran 1SP : 4PP tebal 20 mm 91,720.04
159 A.4.4.2.16. Pemasangan 1 m2 plesteran 1SP : 5PP tebal 20 mm 89,844.59
160 A.4.4.2.17. Pemasangan 1 m2 plesteran 1SP : 6PP tebal 20 mm 88,177.81
161 A.4.4.2.18. Pemasangan 1 m2 plesteran 1SM : 1 KP : 2PP tebal 20 mm 81,624.08
162 A.4.4.2.19. Pemasangan 1 m2 berapen 1SP : 5PP tebal 15 mm 41,892.89
163 A.4.4.2.20. Pemasangan 1 m’ plesteran skoning 1SP : 3PP lebar 10 cm 68,302.02
164 A.4.4.2.21. Pemasangan 1 m2 plesteran granit 1SP : 2 granit tebal 1cm 194,177.50
165 A.4.4.2.22 Pemasangan 1 m2 plesteran traso 1SP : 2 traso tebal 1 cm 194,177.50
166 A.4.4.2.23. Pemasangan 1 m2 plesteran ciprat 1SP : 2PP 53,350.15
167 A.4.4.2.24 Pemasangan 1 m2 finishing siar pasangan bata merah 31,332.17
168 A.4.4.2.25. Pemasangan 1 m2 finishing siar pasangan conblock ekspose 14,976.22
169 A.4.4.2.26. Pemasangan 1 m2 finishing siar pasangan batu kali, campuran 1SP : 2PP 65,696.02
170 A.4.4.2.27. Pemasangan 1 m2 acian 39,913.34
A.4.4.3 HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING
171 A.4.4.3.2. Pemasangan 1 m2 lantai ubin PC abu-abu ukuran 30 cm x30 cm 111,955.73
172 A.4.4.3.3. Pemasangan 1 m2 lantai ubin PC abu-abu ukuran 20 cm x 20 cm 146,935.23
173 A.4.4.3.5. Pemasangan 1 m2 lantai ubin warna ukuran 30 cm x 30 cm 124,548.46
174 A.4.4.3.6. Pemasangan 1 m2 lantai ubin warna ukuran 20 cm x 20 cm 165,384.10
175 A.4.4.3.9. Pemasangan 1 m2 lantai ubin granit ukuran 40 cm x 40 cm 575,421.89
176 A.4.4.3.32. Pemasangan 1m2 lantai keramik artistik 10 cm x 20 cm 237,159.71
177 A.4.4.3.35. Pemasangan 1m2 lantai keramik ukuran 30 cm x 30 cm 216,767.02
178 A.4.4.3.36. Pemasangan 1m2 lantai keramik ukuran 20 cm x 20 cm 379,015.29
179 A.4.4.3.38. Pemasangan 1m2 lantai keramik mozaik ukuran 30 cm x 30 cm 233,563.43
180 A.4.4.3.39. Pemasangan 1 m’ plint keramik ukuran 10 cm x 20 cm 112,403.94
181 A.4.4.3.40. Pemasangan 1 m’ plint keramik ukuran 10 cm x 10 cm 154,657.82
182 A.4.4.3.41. Pemasangan 1 m’ plint keramik ukuran 5 cm x 20 cm 89,826.19
183 A.4.4.3.42. Pemasangan 1 m’ plint internal cove artistik 5 cm x 5 cm x 20 cm 288,310.82
184 A.4.4.3.43. Pemasangan 1 m2 lantai marmer ukuran 100cm x 100cm 1,267,789.25
185 A.4.4.3.44. Pemasangan 1 m2 lantai karpet 211,302.44
186 A.4.4.3.45. Pemasangan 1 m2 underlayer (pelapis bawah karpet) 129,842.19
187 A.4.4.3.46. Pemasangan 1 m2 lantai parquet kayu 380,983.50
188 A.4.4.3.47. Pemasangan 1 m2 lantai kayu gymfloor 380,983.50
189 A.4.4.3.49. Pemasangan 1 m2 dinding porselen 10 cm x 20 cm 266,135.90
190 A.4.4.3.50. Pemasangan 1 m2 dinding porselen 20 cm x 20 cm 258,386.05
191 A.4.4.3.51. Pemasangan 1 m2 dinding keramik artistik 10 cm x 20 cm 434,357.90
192 A.4.4.3.52. Pemasangan 1 m2 dinding keramik artistik 5 cm x 20 cm 435,548.15
193 A.4.4.3.53. Pemasangan 1 m2 dinding keramik 10 cm x 20 cm 266,135.90
194 A.4.4.3.54. Pemasangan 1 m2 dinding keramik 20 cm x 20 cm 259,708.55
195 A.4.4.3.55. Pemasangan 1 m2 dinding marmer 100 cm x 100 cm 1,377,773.18
196 A.4.4.3.56. Pemasangan 1 m2 dinding bata pelapis 3 cm x 7 cm x 24 cm 562,240.56
197 A.4.4.3.57. Pemasangan 1 m2 dinding batu paras 155,479.07
198 A.4.4.3.58. Pemasangan 1 m2 dinding batu tempel hitam 151,623.98
199 A.4.4.3.59. Pemasangan 1 m2 lantai vynil ukuran 30 cm x 30 cm 218,811.08
200 A.4.4.3.60. Pemasangan 1 m2 wallpaper lebar 50 cm 267,898.25
201 A.4.4.3.61. Pemasangan 1m2 floor harderner 92,845.25
202 A.4.4.3.62. Pemasangan 1 m’ plint vynil 15cm x 30cm 47,067.20
203 A.4.4.3.63. Pemasangan 1 m’ plint kayu tebal 2 cm lebar 10 cm 67,717.75
204 A.4.4.3.64. Pemasangan 1 m2 paving block natural tebal 6 cm 182,250.99
205 A.4.4.3.65. Pemasangan 1 m2 paving block natural tebal 8 cm 847,334.00
206 A.4.4.3.66. Pemasangan 1 m2 paving block berwarna tebal 6 cm 192,536.08
207 A.4.4.3.67. Pemasangan 1 m2 paving block berwarna tebal 8 cm 857,619.08
A.4.5.1 SATUAN PEKERJAAN LANGIT-LANGIT (PLAFOND)
208 A.4.5.1.1. Pemasangan 1 m2 langit-langit asbes semen, tebal 4 mm, 5 mm, dan 6 mm 67,223.25
209 A.4.5.1.2. Pemasangan 1 m2 langit-langit akustik ukuran (30 x 30) cm 839,396.50
210 A.4.5.1.3. Pemasangan 1 m2 langit-langit akustik ukuran (30 x 60) cm 421,222.00
211 A.4.5.1.4. Pemasangan 1 m2 langit-langit akustik ukuran (60 x 120) cm 126,413.75
212 A.4.5.1.5. Pemasangan 1 m2 langit-langit tripleks ukuran (120 x 240) cm, tebal 3 mm, 4 mm & 6 mm 66,372.25
213 A.4.5.1.6. Pemasangan 1 m2 langit-langit lambrisering kayu, tebal 9 mm 261,055.75
214 A.4.5.1.7. Pemasangan 1 m2 langit-langit gypsum board ukuran (120x240x9) mm, tebal 9 mm 45,087.48
215 A.4.5.1.8. Pemasangan 1 m2 langit-langit akustik ukuran (60 x 120) cm berikut rangka alluminium 699,331.10
216 A.4.5.1.9. Pemasangan 1 m’ list langit-langit kayu profil 18,958.90
A.4.5.2. HARGA SATUAN PEKERJAAN PENUTUP ATAP
217 A.4.5.2.1. Pemasangan 1 m2 atap genteng palentong kecil 55,182.75
218 A.4.5.2.2. Pemasangan 1 m2 atap genteng kodok glazuur 71,783.00
219 A.4.5.2.3. Pemasangan 1 m2 atap genteng palentong besar/super 49,300.50
220 A.4.5.2.4. Pemasangan 1 m’ bubung genteng palentong 101,584.10
221 A.4.5.2.5. Pemasangan 1 m’ bubung genteng kodok glazuur 114,809.10
222 A.4.5.2.6. Pemasangan 1 m’ bubung genteng palentong besar 120,099.10
223 A.4.5.2.7. Pemasangan 1 m2 roof light fibreglass 90 x 180 73,807.00
224 A.4.5.2.8. Pemasangan 1 m2 atap asbes gelombang 0,92 m x 2 ,5 m x 5 mm 48,909.50
225 A.4.5.2.9. Pemasangan 1 m2 atap asbes gelombang 0,92 m x 2,25 m x 5 mm 53,141.50
226 A.4.5.2.10. Pemasangan 1 m2 atap asbes gelombang 0,92 m x 2,00 m x 5 mm 52,233.00
227 A.4.5.2.11. Pemasangan 1 m2 atap asbes gelombang 0,92 m x 1,80 m x 5 mm 58,581.00
228 A.4.5.2.12. Pemasangan 1 m2 atap asbes gelombang 1,05 m x 3,00 m x 4 mm 41,653.00
229 A.4.5.2.13. Pemasangan 1 m2 atap asbes gelombang 1,05 m x 2,70 m x 4 mm 44,615.40
230 A.4.5.2.14. Pemasangan 1 m2 atap asbes gelombang 1,05 m x 2,40 m x 4 mm 45,461.80
231 A.4.5.2.15. Pemasangan 1 m2 atap asbes gelombang 1,05 m x 2,10 m x 4 mm 48,424.20
232 A.4.5.2.16. Pemasangan 1 m2 atap asbes gelombang 1,05 m x 1,50 m x 4 mm 60,697.00
233 A.4.5.2.17. Pemasangan 1 m2 atap asbes gelombang 1,08 m x 3,00 m x 6 mm 42,499.40
234 A.4.5.2.18. Pemasangan 1 m2 atap asbes gelombang 1,08 m x 2,70 m x 6 mm 42,922.60
235 A.4.5.2.19. Pemasangan 1 m2 atap asbes gelombang 1,08 m x 2,40 m x 6 mm 46,308.20
236 A.4.5.2.20. Pemasangan 1 m2 atap asbes gelombang 1,08 m x 2,10 m x 6 mm 47,577.80
237 A.4.5.2.21. Pemasangan 1 m2 atap asbes gelombang 1,08 m x 1,80 m x 6 mm 50,963.40
238 A.4.5.2.22. Pemasangan 1 m’ bubung stel gelombang 0,92 m 225,848.50
II - 23
HARGA SATUAN
NO KODE ANALISA SATUAN PEKERJAAN
Rp
239 A.4.5.2.23. Pemasangan 1 m’ bubung stel gelombang 1,05 m 201,250.00
240 A.4.5.2.24. Pemasangan 1 m’ bubung stel gelombang 1,08 m 197,150.25
241 A.4.5.2.25. Pemasangan 1 m’ nok paten 0,92 m 127,454.50
242 A.4.5.2.26. Pemasangan 1 m’ nok paten 1,05 m 127,454.50
243 A.4.5.2.27. Pemasangan 1 m’ nok paten 1,08 m 127,454.50
II - 24
HARGA SATUAN
NO KODE ANALISA SATUAN PEKERJAAN
Rp
244 A.4.5.2.28. Pemasangan 1 m’ nok stel rata 0,92 m 123,889.50
245 A.4.5.2.29. Pemasangan 1 m’ nok stel rata 1,05 m 119,255.00
246 A.4.5.2.30. Pemasangan 1 m2 genteng beton 107,341.00
247 A.4.5.2.32. Pemasangan 1 m2 genteng metal ukuran 80 x 100 atap pelana 120,382.00
248 A.4.5.2.33. Pemasangan 1 m2 genteng metal ukuran 80 x 100 atap jurai 164,818.00
249 A.4.5.2.34. Pemasangan 1 m2 atap sirap kayu 122,204.75
250 A.4.5.2.35. Pemasangan 1 m’ nok genteng beton 123,873.86
251 A.4.5.2.37. Pemasangan 1 m’ nok genteng metal 111,752.40
252 A.4.5.2.38. Pemasangan 1 m’ nok sirap 92,368.00
253 A.4.5.2.39. Pemasangan 1 m2 atap seng gelombang 94,875.00
254 A.4.5.2.40. Pemasangan 1 m’nok atap seng 57,247.00
255 A.4.5.2.41. Pemasangan 1 m2 atap alumunium 309,925.00
256 A.4.5.2.43. Pemasangan 1 m2 alumunium foil/sisalation 34,416.63
A.4.6.1 HARGA SATUAN PEKERJAAN KAYU
257 A.4.6.1.1. Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas I 17,531,462.50
258 A.4.6.1.2. Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas II atau III 8,746,037.50
259 A.4.6.1.3. Pembuatan dan pemasangan 1 m2 pintu klamp standar, kayu kelas II 447,821.50
260 A.4.6.1.4. Pembuatan dan pemasangan 1 m2 pintu klamp sederhana, kayu kelas III 368,471.50
261 A.4.6.1.5. Pembuatan dan pemasangan 1 m2 daun pintu panel, kayu kelas I atau II 804,137.50
262 A.4.6.1.6. Pembuatan dan pemasangan 1 m2 pintu dan jendela kaca, kayu kelas I atau II 586,442.50
263 A.4.6.1.7. Pembuatan dan pemasangan 1 m2 pintu dan jendela jalusi kayu kelas I atau II 962,837.50
264 A.4.6.1.8. Pembuatan 1 m2 daun pintu plywood rangkap, rangka kayu kelas II tertutup (lebar sampai 90 cm) 671,804.13
265 A.4.6.1.9. Pembuatan 1 m2 pintu plywood rangkap, rangka expose kayu kelas I atau II 727,751.63
266 A.4.6.1.10. Pemasangan 1 m2 jalusi kusen, kayu kelas I atau II 789,187.50
267 A.4.6.1.11. Pemasangan 1 m2 teakwood rangkap, rangka expose kayu kelas I 828,592.25
268 A.4.6.1.12. Pemasangan 1 m2 teakwood rangkap lapis formika, rangka expose kayu kelas II 725,707.50
269 A.4.6.1.13. Pemasangan 1 m3 konstruksi kuda-kuda konvensional, kayu kelas I, II dan III bentang 6 meter 7,591,710.63
270 A.4.6.1.14. Pemasangan 1 m3 konstruksi kuda-kuda expose, kayu kelas I 18,980,045.63
271 A.4.6.1.15. Pemasangan 1 m3 konstruksi gordeng, kayu kelas II 11,108,525.63
272 A.4.6.1.16. Pemasangan 1 m2 rangka atap genteng keramik, kayu kelas II 124,773.85
273 A.4.6.1.17. Pemasangan 1 m2 rangka atap genteng beton, kayu kelas II 125,745.89
274 A.4.6.1.18. Pemasangan 1 m2 rangka atap sirap, kayu kelas II 122,786.65
275 A.4.6.1.19. Pemasangan 1 m2 rangka langit-langit (50 x 100) cm, kayu kelas II atau III 173,362.50
276 A.4.6.1.20. Pemasangan 1 m2 rangka langit-langit (60 x 60) cm, kayu kelas II atau III 176,266.25
277 A.4.6.1.21. Pemasangan 1 m’ lisplank ukuran (3 x 20) cm, kayu kelas I atau kelas II 112,010.00
278 A.4.6.1.22. Pemasangan 1 m’ lisplank ukuran (3 x 30) cm, kayu kelas I atau kelas II 112,010.00
279 A.4.6.1.23. Pemasangan 1 m2 rangka dinding pemisah (60 x 120) cm kayu kelas II atau III 211,611.50
280 A.4.6.1.25. Pemasangan 1 m2 dinding pemisah plywood rangkap, rangka kayu kelas II 420,216.04
281 A.4.6.1.26. Pemasangan 1 m2 dinding lambrisering dari papan kayu kelas I 406,438.75
282 A.4.6.1.27. Pemasangan 1 m2 dinding lambrisering dari plywood ukuran (120 x 240) cm 63,152.25
A.4.6.2 HARGA SATUAN PEKERJAAN KUNCI DAN KACA
283 A.4.6.2.1. Pemasangan 1 buah kunci tanam antik 383,709.00
284 A.4.6.2.2. Pemasangan 1 buah kunci tanam biasa 237,072.50
285 A.4.6.2.3. Pemasangan 1 buah kunci kamar mandi 130,536.50
286 A.4.6.2.4. Pemasangan 1 buah kunci silinder 163,599.00
287 A.4.6.2.5. Pemasangan 1 buah engsel pintu 101,885.40
288 A.4.6.2.6. Pemasangan 1 buah engsel jendela kupu-kupu 48,081.50
289 A.4.6.2.7. Pemasangan 1 buah engsel angin 63,779.00
290 A.4.6.2.8. Pemasangan 1 buah spring knip 52,624.00
291 A.4.6.2.9. Pemasangan 1 buah kait angin 33,447.75
292 A.4.6.2.10. Pemasangan 1 buah door closer 445,464.00
293 A.4.6.2.11. Pemasangan 1 buah kunci slot (grendel) 45,908.00
294 A.4.6.2.12. Pemasangan 1 buah door holder 105,581.50
295 A.4.6.2.13. Pemasangan 1 buah door stop 68,540.00
296 A.4.6.2.14. Pemasangan 1 buah rel pintu sorong 552,989.00
297 A.4.6.2.15. Pemasangan 1 buah kunci lemari 225,308.00
298 A.4.6.2.16. Pemasangan 1 m2 kaca tebal 3 mm 117,325.59
299 A.4.6.2.17. Pemasangan 1 m2 kaca tebal 5 mm 134,418.90
300 A.4.6.2.18. Pemasangan 1 m2 kaca tebal 8 mm 247,639.85
301 A.4.6.2.19. Pemasangan 1 m2 kaca buram tebal 12 mm 565,879.93
302 A.4.6.2.20. Pemasangan 1 m2 kaca cermin tebal 5 mm 219,920.25
303 A.4.6.2.21. Pemasangan 1 m2 kaca cermin tebal 8 mm 401,546.08
304 A.4.6.2.22. Pemasangan 1 m2 kaca wireglassed tebal 5 mm 329,026.50
305 A.4.6.2.23. Pemasangan 1 m2 kaca patri tebal 5 mm 2,940,774.25
A.4.7.1 HARGA SATUAN PEKERJAAN PENGECATAN
306 A.4.7.1.1. 1 m2 Pengikisan/pengerokan permukaan cat lama 15,867.13
307 A.4.7.1.2. 1 m2 Pencucian bidang permukaan tembok yang pernah dicat 14,941.38
308 A.4.7.1.3. 1 m2 Pengerokan karat pada permukaan baja cara manual 15,631.38
309 A.4.7.1.4. 1 m2 Pengecatan bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup) 52,727.50
310 A.4.7.1.5. Pengecatan 1 m2 bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 3 lapis cat penutup) 70,308.70
311 A.4.7.1.6. Pelaburan 1 m2 bidang kayu dengan teak oil 35,159.53
312 A.4.7.1.7. Pelaburan 1 m2 bidang kayu dengan politur 50,559.24
313 A.4.7.1.8. Pelaburan 1 m2 bidang kayu dengan cat residu dan ter 22,757.06
314 A.4.7.1.9. Pelaburan 1 m2 bidang kayu dengan vernis 46,075.76
315 A.4.7.1.10. Pengecatan 1 m2 tembok baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup) 34,765.65
316 A.4.7.1.11. Pengecatan 1 m2 tembok lama (1 lapis cat dasar, 2 lapis cat penutup) 21,816.65
317 A.4.7.1.12. Pelaburan 1 m2 tembok dengan kalkarium 11,329.23
318 A.4.7.1.13. Pelaburan 1 m2 tembok dengan kapur sirih 18,385.05
319 A.4.7.1.14. Pelaburan 1 m2 tembok lama dengan kapur sirih (pemeliharaan) 9,619.75
320 A.4.7.1.15. Pemasangan 1 m2 wallpaper 147,154.00
321 A.4.7.1.16. Pengecatan 1 m2 permukaan baja dengan menie besi 36,222.70
322 A.4.7.1.17. Pengecatan 1 m2 permukaan baja dengan menie besi dengan perancah 71,155.10
323 A.4.7.1.18. Pengecatan 1 m2 permukaan baja galvanis secara manual 4 lapis 76,187.50
324 A.4.7.1.19. Pengecatan 1 m2 permukaan baja galvanis secara manual sistem 1 lapis cat mutakhir 37,477.35
325 A.4.7.1.20. Pengecatan 1 m2 permukaan baja galvanis secara manual sistem 3 lapis 172,364.88
II - 25
HARGA SATUAN
NO KODE ANALISA SATUAN PEKERJAAN
Rp
326 A.4.7.1.21. Pengecatan 1 m2 permukaan baja galvanis secara semprot sistem 3 lapis cat mutakhir 155,544.40
327 A.4.7.1.22. Plituran 10 m2 dengan plitur melamic 2,313,725.25
A.5.1.1 HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG
328 A.5.1.1.1. (K3) Pemasangan 1 buah closet duduk/monoblock 2,200,298.45
329 A.5.1.1 2. Pemasangan 1 buah closet jongkok porselen 523,510.04
II - 26
HARGA SATUAN
NO KODE ANALISA SATUAN PEKERJAAN
Rp
330 A.5.1.1 3. Pemasangan 1 buah closet jongkok teraso 462,675.04
331 A.5.1.1 4. (K3) Pemasangan 1 buah urinoir 1,368,823.29
332 A.5.1.1 5. (K3) Pemasangan 1 buah wastafel 1,555,958.88
333 A.5.1.1 7. (K3) Pemasangan 1 buah bak fiberglass vol 1 m3 1,302,214.00
334 A.5.1.1 9. Pemasangan 1 buah bak mandi teraso vol 0,30 m3 1,302,214.00
335 A.5.1.1 10. Pemasangan 1 buah bak air fiberglass vol 1 m3 418,669.00
336 A.5.1.1 12. Pemasangan 1 buah bak cuci piring stainlessteel 1,085,082.50
337 A.5.1.1 13. Pemasangan 1 buah bak cuci piring teraso 869,170.72
338 A.5.1.1 14. Pemasangan 1 buah floor drain 124,746.25
339 A.5.1.1 15. Pemasangan 1 buah bak kontrol pasangan bata 30x30 tinggi 35 cm 517,002.48
340 A.5.1.1 16. Pemasangan 1 buah bak kontrol pasangan bata 45cm x 45cm tinggi 50 cm 831,230.21
341 A.5.1.1 17. Pemasangan 1 buah bak kontrol pasangan bata 60 cm x 60 cm tinggi 65 cm 991,008.04
342 A.5.1.1 18. Pemasangan 1 m’ pipa galvanis diameter ½” 98,106.11
343 A.5.1.1 19. Pemasangan 1 buah kran diameter ½” atau ¾ ” 73,720.75
344 A.5.1.1 20. Pemasangan 1 m’ pipa galvanis diameter ¾ ” 113,399.78
345 A.5.1.1 21. Pemasangan 1 m’ pipa galvanis diameter 1” 190,395.01
346 A.5.1.1 22. Pemasangan 1 m’ pipa galvanis diameter 1 ½” 278,803.10
347 A.5.1.1 23. Pemasangan 1 m’ pipa galvanis diameter 3” 399,729.94
348 A.5.1.1 24. Pemasangan 1 m’ pipa galvanis diameter 4” 575,998.46
349 A.5.1.1 25. Pemasangan 1 m’ pipa PVC tipe AW diameter ½ ” 22,687.98
350 A.5.1.1 26. Pemasangan 1 m’ pipa PVC tipe AW diameter ¾ ” 26,178.22
351 A.5.1.1 27. Pemasangan 1 m’ pipa PVC tipe AW diameter 1” 32,340.82
352 A.5.1.1 28. Pemasangan 1 m’ pipa PVC tipe AW diameter 1 ½ ” 52,590.94
353 A.5.1.1 29. Pemasangan 1 m’ pipa PVC tipe AW diameter 2” 62,458.43
354 A.5.1.1 30. Pemasangan 1 m’ pipa PVC tipe AW diameter 2 ½ ” 91,729.16
355 A.5.1.1 31. Pemasangan 1 m’ pipa PVC tipe AW diameter 3” 117,043.84
356 A.5.1.1 32. Pemasangan 1 m’ pipa PVC tipe AW diameter 4” 175,705.05
357 A.5.1.1 33. Pemasangan 1 m’ pipa air limbah jenis pipa tanah Ǿ 20 cm 405,113.89
358 A.5.1.1 34. Pemasangan 1 m’ pipa air limbah jenis pipa tanah diameter 15 cm 225,856.90
359 A.5.1.1 35. Pemasangan 1 m’ pipa beton diameter 15 – 20 cm 1,072,627.17
360 A.5.1.1.36. Pemasangan 1 m’ pipa beton diameter 30 – 100 cm 200,947.04
A.8.4.6 HARGA SATUAN PEKERJAAN ELEKTRIKAL
361 A.8.4.6.1 (K3) Pemasangan 1 buah titik lampu (Instalasi) 6,370,482.50
362 A.8.4.6.1 (K3) Pemasangan 1 buah MCB (Penyambungan Daya ke PLN) 6,165,495.00
- TAMBAHAN / LAIN-LAIN
363 - 1 Buah Pembuatan Papan Nama Proyek 425,318.88
364 SNI 7395:2008 N0.6.9 Memasang 1 m2 lantai ubin granit ukuran 40 x 40 431,485.29
365 SNI 03-7395:2008 N0.6.9 Memasang 1 m2 lantai keramik ukuran 40 x 40 178,329.88
366 SNI 03-7395:2008 N0.6.9 Memasang 1 m2 lantai granit ukuran 60 x 60 352,538.19
367 SNI 2839:2008 N0.6.8 Memasang 1 m' List Plafond Gypsum Profil 43,017.19
368 SNI 2839:2008 N0.6.8 1 m' Pasang Listplank Woodplank 59,110.00
369 ABK.990.07 Menurunkan 1 m2 atap genteng 2,146.67
370 ABK.990.09 Menurunkan 1 m2 rangka atap/Plafond 6,593.33
371 ABK.990.12 Menurunkan 1 m3 kayu rangka kuda-kuda 82,493.33
372 ABK.990.05 Membongkar 1 m2 lantai tegel/floor 7,053.33
373 SNI 2012 1 m³ Bongkaran Beton Bertulang 659,318.00
374 SNI 2012 1 m³ Bongkaran Dinding Tembok Bata Merah 617,918.00
375 ABK.300.19 1 m3 Pekerjaan Beton AD. 1:2:3 1,089,200.65
376 - 1m2 Pasang Plafond Rangka Holo dan Dengan Penutup GRC Berikut Pengecatan 123,063.23
377 - 1 Titik Pekerjaan Instalasi Lampu dan Stop Kontak 194,396.00
378 - 1 Bh Pekerjaan Stop Kontak 40,882.50
379 - 1 Bh Pekerjaan Lampu SL 18 Watt + Fitting 71,300.00
380 - 1 Unit Pekerjaan Sekring Kast 63,365.00
381 - 1 Bh Pekerjaan MCB Box 63,365.00
382 - 1 m' Pekerjaan Over Spaneng 40,330.50
383 - 1 Bh Pekerjaan Saklar Ganda 68,540.00
384 - 1 Bh Pekerjaan Saklar Tunggal 64,572.50
385 A.3.2.1.2.a Pemasangan pasangan 1 m3 batu belah campuran 1SP : 4PP 1,169,022.73
JALAN LINGKUNGAN
386 Analisa EI-311a : Galian Biasa / Kupasan (menggunakan alat berat) 114,458.93
387 Analisa EI-321.rob : Timbunan Biasa 377,121.30
388 Analisa EI-322.rob : Timbunan Pilihan 462,654.43
389 Analisa EI-331.rob : Penyiapan Badan Jalan 195.87
390 Analisa EI-611a : Lapis Resap Pengikat - Aspal Cair 16,145.36
391 Analisa EI-612a : Lapis Perekat - Aspal Cair 16,655.58
392 Analisa EI-621 : Agregat Penutup BURTU 19,529.97
393 Analisa EI-631.rob : Latasir Kelas A (SS-A) 69,844.63
394 Analisa EI-632.rob : Latasir Kelas B (SS-B) 78,592.17
395 Analisa EI-661 : Lapis Permukaan Penetrasi Macadam 2,476,741.15
396 Analisa EI-662 : Lapis Pondasi/Perata Penetrasi Macadam 2,628,149.13
397 Analisa EI-814 : Waterbound Macadam Utk. Pek. Minor 493,706.69
398 Analisa EI-817 : Penetrasi Macadam Utk.Pek.Minor (Perata) 2,411,230.62
399 Analisa EI-412 : Lapis Pondasi Agregat Kelas A (Buruh) 571,293.68
400 Analisa EI-422 : Lapis Pondasi Agregat Kelas B (Buruh) 466,957.35
401 Analisa EI-192a rob : Udit Type U 300 X 300 680,193.65
402 Analisa EI-192b rob : Udit Type U 400 X 400 831,090.90
403 Analisa EI-181 : Bok Culvert BC 400 X 400 2,058,469.90
404 Analisa EI-182 : Box Culvert BC 500 x 500 HD 2,510,368.15
405 - 1 m2 Memasang Paving Block t = 8 cm (K - 250) 200,965.38
406 - 1 m' Memasang Kansteen, tebal 10 x 20 x 40 cm 177,795.85
407 Analisa EI-714 : Perkerasan Jalan Beton Ready Mix K-225 (dengan angkutan) 1,479,977.26
408 Analisa EI-619 : Beton Struktur Site Mix K-125 1,103,692.36
II - 27
HARGA SATUAN
NO KODE ANALISA SATUAN PEKERJAAN
Rp
409 AT.02.a 1 m' Pengeboran Pilot hole Ø 6'' (daerah batuan keras) 542,807.48
410 AT.02.b 1 m' Pengeboran Pilot hole Ø 6'' (daerah batuan sedang) 417,715.51
411 AT.02.rob.1 1 m' Pengeboran sederhana 271,403.74
412 AT.03.a 1 m' Pengeboran Reaming Ø 10'' (daerah batuan keras) 501,931.30
413 AT.03.b 1 m' Pengeboran Reaming Ø 10'' (daerah batuan sedang) 386,212.55
II - 28
HARGA SATUAN
NO KODE ANALISA SATUAN PEKERJAAN
Rp
414 AT.07 1 m' Pengadaan dan pemasangan konstuksi pipa cassing PVC 6'' 360,999.49
415 AT.09 1 m' Pengadaan dan pemasangan konstuksi pipa cassing PVC 8'' 542,027.68
416 AT.12 1 m3 Pengadaan dan pemasangan gravel pack 3,412,935.50
417 AT.13 1 jam pencucian sumur 194,298.25
418 AT.14 1 jam Uji Pemompaan 194,298.25
437 - 1 m' Pemasangan pipa PVC dia. 350 mm melalui galian tanah berbatu / bongkar jalan 231,771.26
438 - 1 m' Pemasangan pipa PVC dia. 300 mm melalui galian tanah berbatu / bongkar jalan 217,232.43
439 - 1 m' Pemasangan pipa PVC dia. 250 mm melalui galian tanah berbatu / bongkar jalan 188,654.77
440 - 1 m' Pemasangan pipa PVC dia. 200 mm melalui galian tanah berbatu / bongkar jalan 146,373.03
441 - 1 m' Pemasangan pipa PVC dia. 160 mm melalui galian tanah berbatu / bongkar jalan 113,474.19
442 - 1 m' Pemasangan pipa PVC dia. 110 mm melalui galian tanah berbatu / bongkar jalan 91,309.35
443 - 1 m' Pemasangan pipa PVC dia. 90 mm melalui galian tanah berbatu / bongkar jalan 83,653.35
444 - 1 m' Pemasangan pipa PVC dia. 63 mm melalui galian tanah berbatu / bongkar jalan 52,543.51
445 - 1 m' Pemasangan pipa PVC dia. 50 mm melalui galian tanah berbatu / bongkar jalan 52,043.51
446 - 1 m' Pemasangan pipa PVC dia. 25 mm melalui galian tanah berbatu / bongkar jalan 23,800.60
447 - 1 m' Pemasangan pipa PVC dia. 350 mm melalui galian tanah keras / berbatu 205,737.34
448 - 1 m' Pemasangan pipa PVC dia. 300 mm melalui galian tanah keras / berbatu 192,825.63
449 - 1 m' Pemasangan pipa PVC dia. 250 mm melalui galian tanah keras / berbatu 167,502.21
450 - 1 m' Pemasangan pipa PVC dia. 200 mm melalui galian tanah keras / berbatu 128,622.63
451 - 1 m' Pemasangan pipa PVC dia. 160 mm melalui galian tanah keras / berbatu 100,161.39
452 - 1 m' Pemasangan pipa PVC dia. 110 mm melalui galian tanah keras / berbatu 80,659.11
453 - 1 m' Pemasangan pipa PVC dia. 90 mm melalui galian tanah keras / berbatu 74,186.47
454 - 1 m' Pemasangan pipa PVC dia. 63 mm melalui galian tanah keras / berbatu 47,218.39
455 - 1 m' Pemasangan pipa PVC dia. 50 mm melalui galian tanah keras / berbatu 46,718.39
456 - 1 m' Pemasangan pipa PVC dia. 25 mm melalui galian tanah keras / berbatu 20,250.52
457 - 1 m' Pemasangan pipa PVC dia. 350 mm melalui galian tanah biasa 184,647.26
458 - 1 m' Pemasangan pipa PVC dia. 300 mm melalui galian tanah biasa 173,053.68
459 - 1 m' Pemasangan pipa PVC dia. 250 mm melalui galian tanah biasa 150,366.52
460 - 1 m' Pemasangan pipa PVC dia. 200 mm melalui galian tanah biasa 114,243.03
461 - 1 m' Pemasangan pipa PVC dia. 160 mm melalui galian tanah biasa 89,376.69
462 - 1 m' Pemasangan pipa PVC dia. 110 mm melalui galian tanah biasa 72,031.35
463 - 1 m' Pemasangan pipa PVC dia. 90 mm melalui galian tanah biasa 66,517.35
464 - 1 m' Pemasangan pipa PVC dia. 63 mm melalui galian tanah biasa 42,904.51
465 - 1 m' Pemasangan pipa PVC dia. 50 mm melalui galian tanah biasa 42,404.51
466 - 1 m' Pemasangan pipa PVC dia. 25 mm melalui galian tanah biasa 17,374.60
467 - 1 m' Perbaikan pipa PVC dia. 350 mm melalui galian tanah berbatu / bongkar jalan 388,821.26
468 - 1 m' Perbaikan pipa PVC dia. 300 mm melalui galian tanah berbatu / bongkar jalan 333,324.75
469 - 1 m' Perbaikan pipa PVC dia. 250 mm melalui galian tanah berbatu / bongkar jalan 281,597.09
470 - 1 m' Perbaikan pipa PVC dia. 200 mm melalui galian tanah berbatu / bongkar jalan 232,573.03
471 - 1 m' Perbaikan pipa PVC dia. 160 mm melalui galian tanah berbatu / bongkar jalan 174,524.19
472 - 1 m' Perbaikan pipa PVC dia. 110 mm melalui galian tanah berbatu / bongkar jalan 141,709.35
473 - 1 m' Perbaikan pipa PVC dia. 90 mm melalui galian tanah berbatu / bongkar jalan 123,453.35
474 - 1 m' Perbaikan pipa PVC dia. 63 mm melalui galian tanah berbatu / bongkar jalan 77,693.51
475 - 1 m' Perbaikan pipa PVC dia. 50 mm melalui galian tanah berbatu / bongkar jalan 72,443.51
476 - 1 m' Perbaikan pipa PVC dia. 25 mm melalui galian tanah berbatu / bongkar jalan 40,750.60
477 - 1 m' Perbaikan pipa PVC dia. 350 mm melalui galian tanah keras / berbatu 362,787.34
478 - 1 m' Perbaikan pipa PVC dia. 300 mm melalui galian tanah keras / berbatu 308,759.25
479 - 1 m' Perbaikan pipa PVC dia. 250 mm melalui galian tanah keras / berbatu 260,444.53
480 - 1 m' Perbaikan pipa PVC dia. 200 mm melalui galian tanah keras / berbatu 214,822.63
481 - 1 m' Perbaikan pipa PVC dia. 160 mm melalui galian tanah keras / berbatu 161,211.39
482 - 1 m' Perbaikan pipa PVC dia. 110 mm melalui galian tanah keras / berbatu 131,059.11
483 - 1 m' Perbaikan pipa PVC dia. 90 mm melalui galian tanah keras / berbatu 113,986.47
484 - 1 m' Perbaikan pipa PVC dia. 63 mm melalui galian tanah keras / berbatu 72,368.39
485 - 1 m' Perbaikan pipa PVC dia. 50 mm melalui galian tanah keras / berbatu 67,118.39
486 - 1 m' Perbaikan pipa PVC dia. 25 mm melalui galian tanah keras / berbatu 37,200.52
487 - 1 m' Perbaikan pipa PVC dia. 350 mm melalui galian tanah biasa 341,697.26
488 - 1 m' Perbaikan pipa PVC dia. 300 mm melalui galian tanah biasa 289,146.00
489 - 1 m' Perbaikan pipa PVC dia. 250 mm melalui galian tanah biasa 243,308.84
490 - 1 m' Perbaikan pipa PVC dia. 200 mm melalui galian tanah biasa 200,443.03
491 - 1 m' Perbaikan pipa PVC dia. 160 mm melalui galian tanah biasa 150,426.69
492 - 1 m' Perbaikan pipa PVC dia. 110 mm melalui galian tanah biasa 122,431.35
493 - 1 m' Perbaikan pipa PVC dia. 90 mm melalui galian tanah biasa 106,317.35
494 - 1 m' Perbaikan pipa PVC dia. 63 mm melalui galian tanah biasa 68,054.51
495 - 1 m' Perbaikan pipa PVC dia. 50 mm melalui galian tanah biasa 62,804.51
496 - 1 m' Perbaikan pipa PVC dia. 25 mm melalui galian tanah biasa 34,324.60
497 - 400 m' Pengetesan pipa PVC dia. 350 mm 3,636,500.00
498 - 400 m' Pengetesan pipa PVC dia. 300 mm 3,037,500.00
499 - 400 m' Pengetesan pipa PVC dia. 250 mm 2,470,000.00
500 - 400 m' Pengetesan pipa PVC dia. 200 mm 1,934,000.00
501 - 400 m' Pengetesan pipa PVC dia. 160 mm 1,238,250.00
502 - 400 m' Pengetesan pipa PVC dia. 110 mm 1,198,500.00
503 - 400 m' Pengetesan pipa PVC dia. 90 mm 1,119,750.00
504 - 400 m' Pengetesan pipa PVC dia. 63 mm 1,072,500.00
505 - 400 m' Pengetesan pipa PVC dia. 50 mm 1,035,750.00
506 - 1 unit perbaikan gate valve dia. 350mm 821,119.05
507 - 1 unit perbaikan gate valve dia. 300mm 805,369.05
508 - 1 unit perbaikan gate valve dia. 250mm 794,869.05
509 - 1 unit perbaikan gate valve dia. 200mm 779,119.05
510 - 1 unit Perbaikan gate valve dia. 160 mm melalui galian tanah berbatu / bongkar jalan 522,023.88
511 - 1 unit Perbaikan gate valve dia. 110 mm melalui galian tanah berbatu / bongkar jalan 428,848.87
512 - 1 unit Perbaikan gate valve dia. 90 mm melalui galian tanah berbatu / bongkar jalan 378,272.87
513 - 1 unit Perbaikan gate valve dia. 63 mm melalui galian tanah berbatu / bongkar jalan 293,440.35
514 - 1 unit Perbaikan gate valve dia. 50 mm melalui galian tanah berbatu / bongkar jalan 272,940.35
515 - 1 unit Perbaikan gate valve dia. 25 mm melalui galian tanah berbatu / bongkar jalan 187,424.61
516 - 1 unit Perbaikan gate valve dia. 160 mm melalui galian tanah keras / berbatu 513,773.88
II - 29
HARGA SATUAN
NO KODE ANALISA SATUAN PEKERJAAN
Rp
517 - 1 unit Perbaikan gate valve dia. 110 mm melalui galian tanah keras / berbatu 423,098.87
518 - 1 unit Perbaikan gate valve dia. 90 mm melalui galian tanah keras / berbatu 378,272.87
519 - 1 unit Perbaikan gate valve dia. 63 mm melalui galian tanah keras / berbatu 293,440.35
520 - 1 unit Perbaikan gate valve dia. 50 mm melalui galian tanah keras / berbatu 272,940.35
521 - 1 unit Perbaikan gate valve dia. 25 mm melalui galian tanah keras / berbatu 187,424.61
II - 30
HARGA SATUAN
NO KODE ANALISA SATUAN PEKERJAAN
Rp
522 - 1 unit Perbaikan gate valve dia. 160 mm melalui galian tanah biasa 465,578.88
523 - 1 unit Perbaikan gate valve dia. 110 mm melalui galian tanah biasa 384,542.87
524 - 1 unit Perbaikan gate valve dia. 90 mm melalui galian tanah biasa 344,000.87
525 - 1 unit Perbaikan gate valve dia. 63 mm melalui galian tanah biasa 274,162.35
526 - 1 unit Perbaikan gate valve dia. 50 mm melalui galian tanah biasa 253,662.35
527 - 1 unit Perbaikan gate valve dia. 25 mm melalui galian tanah biasa 174,572.61
528 - 1 unit pemasangan gate valve dia. 200 mm 759,304.50
529 - 1 unit Pemasangan gate valve dia. 250 mm melalui galian tanah berbatu / bongkar jalan 694,629.03
530 - 1 unit Pemasangan gate valve dia. 160 mm melalui galian tanah berbatu / bongkar jalan 481,663.88
531 - 1 unit Pemasangan gate valve dia. 110 mm melalui galian tanah berbatu / bongkar jalan 389,488.87
532 - 1 unit Pemasangan feet kran dia. 90 mm melalui galian tanah berbatu / bongkar jalan 348,662.87
533 - 1 unit Pemasangan feet kran dia. 63 mm melalui galian tanah berbatu / bongkar jalan 259,080.35
534 - 1 unit Pemasangan feet kran dia. 50 mm melalui galian tanah berbatu / bongkar jalan 238,580.35
535 - 1 unit Pemasangan gate valve dia. 250 mm melalui galian tanah keras / berbatu 515,488.38
536 - 1 unit Pemasangan gate valve dia. 160 mm melalui galian tanah keras / berbatu 481,663.88
537 - 1 unit Pemasangan gate valve dia. 110 mm melalui galian tanah keras / berbatu 389,488.87
538 - 1 unit Pemasangan feet kran dia. 90 mm melalui galian tanah keras / berbatu 348,662.87
539 - 1 unit Pemasangan feet kran dia. 63 mm melalui galian tanah keras / berbatu 259,080.35
540 - 1 unit Pemasangan feet kran dia. 50 mm melalui galian tanah keras / berbatu 238,580.35
541 - 1 unit Pemasangan feet kran dia. 25 mm melalui galian tanah keras / berbatu 158,064.61
542 - 1 unit Pemasangan gate valve dia. 160 mm melalui galian tanah biasa 433,328.88
543 - 1 unit Pemasangan gate valve dia. 110 mm melalui galian tanah biasa 350,792.87
544 - 1 unit Pemasangan feet kran dia. 90 mm melalui galian tanah biasa 314,250.87
545 - 1 unit Pemasangan feet kran dia. 63 mm melalui galian tanah biasa 239,662.35
546 - 1 unit Pemasangan feet kran dia. 50 mm melalui galian tanah biasa 219,162.35
547 - 1 unit Pemasangan feet kran dia. 25 mm melalui galian tanah biasa 145,072.61
548 - 1 unit Pemasangan Box Street dia. 8" 236,440.65
549 - 1 unit Pemasangan Box Street dia. 6" 110,125.50
550 - 1 unit Pemasangan Box Street dia. 4" 92,780.16
551 - 1 unit Pemasangan Box Street dia. 3" 87,266.16
552 - 1 unit Pemasangan Box Street dia. 2" 63,653.32
553 - 1 unit Pemasangan Box Street dia. 1 1/2" 63,153.32
554 - 1 unit Pemasangan Box Street dia. 1" 38,123.41
555 - 1 unit Peninggian Box Street 136,140.82
556 - 1 unit Pemasangan wash out dia. 160 mm 661,461.06
557 - 1 unit Pemasangan wash out dia. 110 mm 534,606.61
558 - 1 unit Pemasangan wash out dia. 90 mm 482,202.05
559 - 1 unit Pemasangan wash out dia. 63 mm 345,966.90
560 - 1 unit Pemasangan wash out dia. 50 mm 323,466.90
561 - 18 m' Pemasangan Pipa PVC dia. 2" Sistim Boring Horizontal 4,329,643.97
562 - 18 m' Pemasangan Pipa PVC dia. 3" Sistim Boring Horizontal 6,710,112.02
563 - 18 m' Pemasangan Pipa PVC dia. 4" Sistim Boring Horizontal 7,787,655.38
564 - 18 m' Pemasangan Pipa PVC dia. 6" Sistim Boring Horizontal 9,713,544.22
565 - 18 m' Pemasangan Pipa PVC dia. 8" Sistim Boring Horizontal 13,587,848.10
566 - 18 m' Pemasangan Pipa PVC dia. 10" Sistim Boring Horizontal 14,366,586.23
567 - 18 m' Pemasangan Pipa PVC dia. 12" Sistim Boring Horizontal 16,246,399.50
568 - 18 m' Pemasangan Pipa PVC dia. 14" Sistim Boring Horizontal 17,018,006.13
569 - 1 m' Pemasangan pipa GI dia. 200 mm melalui galian type FR/CR 144,441.81
570 - 1 unit Tiang Penyangga 492,355.38
571 - 1 m2 Tebas Tebang Berupa Memotong dan Membersihkan Lokasi dari Tanaman/Tumbuhan dia < 15 cm 8,070.00
572 - 1 m3 Angkutan Bahan Material Jarak Angkut Setiap 100 m 59,340.00
Sumber, 2020
II - 31
DAFTAR ANALISA HARGA SATUAN
DINAS PERUMAHAN KAWASAN PERMUKIMAN DAN PERTANAHAN
KABUPATEN CIREBON
TAHUN ANGGARAN 2020
A. 2.2.1.2 (K3) Pembuatan 1 m2 pagar sementara dari seng gelombang tinggi 2 meter
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.200 80,000.00 16,000.00
Tukang kayu L.02 OH 0.400 110,000.00 44,000.00
Kepala tukang L.03 OH 0.020 120,000.00 2,400.00
Mandor L.04 OH 0.020 120,000.00 2,400.00
JUMLAH TENAGA KERJA 64,800.00
B BAHAN
Dolken kayu Batang 1.250 74,750.00 93,437.50
f 8-10/400 cm
Semen portland Kg 2.500 1,633.00 4,082.50
Seng gelombang lbr 1.200 92,000.00 110,400.00
Pasir Beton m3 0.005 244,375.00 1,221.88
Koral Beton m3 0.009 230,000.00 2,070.00
Kayu 5/7 (kayu kelas III) m3 0.072 4,025,000.00 289,800.00
Paku biasa 2''-5'' Kg 0.060 23,000.00 1,380.00
Meni Besi ltr 0.450 50,600.00 22,770.00
JUMLAH HARGA BAHAN 525,161.88
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 589,961.88
E Overhead & Profit 15.00% 88,494.28
F Harga Satuan Pekerjaan (D+E) 678,456.16
A. 2.2.1.3. (K3) Pembuatan 1 m2 pagar sementara dari kawat duri tinggi 1,8 meter
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
III - 32
Pekerja L.01 OH 0.200 80,000.00 16,000.00
Tukang kayu L.02 OH 0.300 110,000.00 33,000.00
Kepala tukang L.03 OH 0.020 120,000.00 2,400.00
Mandor L.04 OH 0.020 120,000.00 2,400.00
JUMLAH TENAGA KERJA 53,800.00
III - 33
B BAHAN
Dolken kayu f Batang 1.000 74,750.00 74,750.00
8-10/400 cm
Semen portland Kg 2.000 1,633.00 3,266.00
Kawat duri M’ 25.000 16,905.00 422,625.00
Pasir beton m3 0.005 244,375.00 1,221.88
Koral beton m3 0.009 230,000.00 2,070.00
Paku biasa 2” – 5” Kg 0.060 23,000.00 1,380.00
JUMLAH HARGA BAHAN 430,562.88
C PERALATAN
III - 34
A. 2.2.1.6. (K3) Pembuatan 1 m2 rumah jaga (konstruksi kayu )
III - 35
D Jumlah (A+B+C) 1,508,430.88
E Overhead & Profit 15.00% 226,264.63
F Harga Satuan Pekerjaan (D+E) 1,734,695.51
III - 36
A. 2.2.1.9. (K3) Pembersihan 1 m2 lapangan dan perataan
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.100 80,000.00 8,000.00
Mandor L.04 OH 0.050 120,000.00 6,000.00
JUMLAH TENAGA KERJA 14,000.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Tukang kayu L.02 OH 0.300 110,000.00 33,000.00
Kepala tukang L.03 OH 0.030 120,000.00 3,600.00
JUMLAH TENAGA KERJA 36,600.00
B BAHAN
Kayu papan kelas m3 0.036 4,025,000.00 144,900.00
III
Kayu balok 5/7 m3 0.014 4,025,000.00 56,350.00
kelas III
Paku biasa kg 0.080 23,000.00 1,840.00
JUMLAH HARGA BAHAN 203,090.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.000 80,000.00 80,000.00
III - 37
Mandor L.04 OH 0.005 120,000.00 600.00
JUMLAH TENAGA KERJA 80,600.00
III - 38
B BAHAN
Batu belah 10/15 cm m3 0.150 345,000.00 51,750.00
Batu pecah mesin 2-3 cm m3 0.090 345,000.00 31,050.00
Pasir pasang m3 0.010 222,812.50 2,228.13
JUMLAH HARGA BAHAN 85,028.13
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 6.667 80,000.00 533,360.00
Mandor L.04 OH 0.333 120,000.00 39,960.00
JUMLAH TENAGA KERJA 573,320.00
B BAHAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 0.042 80,000.00 3,360.00
Tukang L.02 0.004 110,000.00 440.00
Kepala Tukang L.03 0.002 120,000.00 240.00
Mandor L.04 0.042 120,000.00 5,040.00
JUMLAH TENAGA KERJA 9,080.00
B BAHAN
Kawat jaring Lbr 0.143 653,738.20 93,746.06
JUMLAH HARGA BAHAN 93,746.06
C PERALATAN
III - 39
D Jumlah (A+B+C) 102,826.06
E Overhead & Profit 15.00% 15,423.91
F Harga Satuan Pekerjaan (D+E) 118,249.97
III - 40
A.2.2.1.16. Pemasangan 1 m2 panel beton pracetak 5x50x240 cm untuk pagar
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.375 80,000.00 30,000.00
Tukang L.02 OH 0.125 110,000.00 13,750.00
Kepala tukang L.03 OH 0.012 120,000.00 1,440.00
Mandor L.04 OH 0.019 120,000.00 2,280.00
JUMLAH TENAGA KERJA 47,470.00
B BAHAN
Panel beton Lbr 0.986 118,450.00 116,791.70
pracetak
Kolom beton Batang 0.525 201,250.00 105,656.25
pracetak
Semen PC Kg 45.000 1,633.00 73,485.00
Pasir beton m3 0.074 244,375.00 18,083.75
Koral m3 0.146 230,000.00 33,580.00
JUMLAH HARGA BAHAN 347,596.70
C PERALATAN
JUMLAH HARGA ALAT -
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.750 80,000.00 60,000.00
Mandor L.04 OH 0.025 120,000.00 3,000.00
JUMLAH TENAGA KERJA 63,000.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 63,000.00
E Overhead & Profit 15.00% 9,450.00
F Harga Satuan Pekerjaan (D+E) 72,450.00
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.050 80,000.00 84,000.00
Mandor L.04 OH 0.067 120,000.00 8,040.00
JUMLAH TENAGA KERJA 92,040.00
B BAHAN
III - 41
D Jumlah (A+B+C) 92,040.00
E Overhead & Profit 15.00% 13,806.00
F Harga Satuan Pekerjaan (D+E) 105,846.00
III - 42
A.2.3.1.4. Menggali 1 m3 tanah keras sedalam 1 m
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.050 80,000.00 4,000.00
Mandor L.04 OH 0.005 120,000.00 600.00
JUMLAH TENAGA KERJA 4,600.00
B BAHAN
III - 43
F Harga Satuan Pekerjaan (D+E) 5,290.00
III - 44
A.2.3.1.8. (K3) Pembuangan 1 m3 tanah sejauh 30 meter
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.500 80,000.00 40,000.00
Mandor L.04 OH 0.050 120,000.00 6,000.00
JUMLAH TENAGA KERJA 46,000.00
B BAHAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.500 80,000.00 40,000.00
Mandor L.04 OH 0.050 120,000.00 6,000.00
JUMLAH TENAGA KERJA 46,000.00
B BAHAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.300 80,000.00 24,000.00
Mandor L.04 OH 0.010 120,000.00 1,200.00
JUMLAH TENAGA KERJA 25,200.00
B BAHAN
Pasir urug 1.200 222,755.00 267,306.00
JUMLAH HARGA BAHAN 267,306.00
C PERALATAN
III - 45
A.2.3.1.12. Pemasangan 1 m3 lapisan pudel campuran 1KP : 3PP : 7TL
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.800 80,000.00 64,000.00
Tukang L.02 OH 0.400 110,000.00 44,000.00
Kepala Tukang L.03 OH 0.040 120,000.00 4,800.00
Mandor L.04 OH 0.080 120,000.00 9,600.00
JUMLAH TENAGA KERJA 122,400.00
B BAHAN
Kapur Padam/bakar m3 0.135 253,000.00 34,155.00
Pasir Pasang m3 0.400 222,812.50 89,125.00
Tanah Liat m3 0.948 172,500.00 163,530.00
JUMLAH HARGA BAHAN 286,810.00
C PERALATAN
JUMLAH HARGA ALAT -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.500 80,000.00 120,000.00
Tukang batu L.02 OH 0.750 110,000.00 82,500.00
Kepala tukang L.03 OH 0.075 120,000.00 9,000.00
Mandor L.04 OH 0.075 120,000.00 9,000.00
JUMLAH TENAGA KERJA 220,500.00
B BAHAN
Batu belah m3 1.200 345,000.00 414,000.00
Semen Portland Kg 202.000 1,633.00 329,866.00
Pasir pasang m3 0.485 222,812.50 108,064.06
JUMLAH HARGA BAHAN 851,930.06
C PERALATAN
III - 46
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 1,072,430.06
E Overhead & Profit 15.00% 160,864.51
F Harga Satuan Pekerjaan (D+E) 1,233,294.57
III - 47
A.3.2.1.2. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 4PP
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.500 80,000.00 120,000.00
Tukang batu L.02 OH 0.750 110,000.00 82,500.00
Kepala tukang L.03 OH 0.075 120,000.00 9,000.00
Mandor L.04 OH 0.075 120,000.00 9,000.00
JUMLAH TENAGA KERJA 220,500.00
B BAHAN
Batu belah m3 1.200 345,000.00 414,000.00
Semen Portland Kg 163.000 1,633.00 266,179.00
Pasir pasang m3 0.520 222,812.50 115,862.50
JUMLAH HARGA BAHAN 796,041.50
C PERALATAN
III - 48
Tukang batu L.02 OH 0.750 110,000.00 82,500.00
Kepala tukang L.03 OH 0.075 120,000.00 9,000.00
Mandor L.04 OH 0.075 120,000.00 9,000.00
JUMLAH TENAGA KERJA 220,500.00
III - 49
B BAHAN
Batu belah m3 1.200 345,000.00 414,000.00
Semen Portland Kg 91.000 1,633.00 148,603.00
Pasir pasang m3 0.584 222,812.50 130,122.50
JUMLAH HARGA BAHAN 692,725.50
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 913,225.50
E Overhead & Profit 15.00% 136,983.83
F Harga Satuan Pekerjaan (D+E) 1,050,209.33
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.500 80,000.00 120,000.00
Tukang batu L.02 OH 0.750 110,000.00 82,500.00
Kepala tukang L.03 OH 0.075 120,000.00 9,000.00
Mandor L.04 OH 0.075 120,000.00 9,000.00
JUMLAH TENAGA KERJA 220,500.00
B BAHAN
Batu belah m3 1.200 345,000.00 414,000.00
Semen Portland Kg 41.000 1,633.00 66,953.00
Kapur m3 0.131 253,000.00 33,143.00
Pasir pasang m3 0.523 222,812.50 116,530.94
JUMLAH HARGA BAHAN 630,626.94
C PERALATAN
III - 50
D Jumlah (A+B+C) 851,126.94
E Overhead & Profit 15.00% 127,669.04
F Harga Satuan Pekerjaan (D+E) 978,795.98
III - 51
A.3.2.1.9. (K3) Pemasangan 1 m3 batu kosong (anstamping)
A.3.2.1.10. Pemasangan 1 m3 pondasi siklop, 60% beton campuran 1SP : 2 PB : 3 Kr dan 40% batu belah
III - 52
A.4.1.1 HARGA SATUAN PEKERJAAN BETON
A.4.1.1.1 Membuat 1 m3 beton mutu f’c = 7,4 Mpa (sama dengan K 100), setara dengan beton rabat
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.650 80,000.00 132,000.00
Tukang batu L.02 OH 0.275 110,000.00 30,250.00
Kepala tukang L.03 OH 0.028 120,000.00 3,360.00
Mandor L.04 OH 0.083 120,000.00 9,960.00
JUMLAH TENAGA KERJA 175,570.00
B BAHAN
Semen Portland kg 247.000 1,633.00 403,351.00
Pasir beton kg 869.000 174.55 151,687.05
Kerikil (Maks 30 kg 999.000 255.56 255,300.00
mm)/menggunakan bt.pecah mesin 2-
3
Air Liter 215.000 75.00 16,125.00
JUMLAH HARGA BAHAN 826,463.05
C PERALATAN
A.4.1.1.2 Membuat 1 m3 beton mutu f’c = 9,8 Mpa (sama dengan K-125)
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.650 80,000.00 132,000.00
Tukang batu L.02 OH 0.275 110,000.00 30,250.00
Kepala tukang L.03 OH 0.028 120,000.00 3,360.00
Mandor L.04 OH 0.083 120,000.00 9,960.00
JUMLAH TENAGA KERJA 175,570.00
B BAHAN
1. Semen kg 276.000 1,633.00 450,708.00
Portland
2. Pasir beton kg 828.000 174.55 144,530.36
3. Kerikil kg 1,012.000 255.56 258,622.22
(Maks 30mm)
4. Air Liter 215.000 75.00 16,125.00
JUMLAH HARGA BAHAN 869,985.58
C PERALATAN
A.4.1.1.3 Membuat 1 m3 beton mutu f’c = 12,2 Mpa (sama denga K 150)
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.650 80,000.00 132,000.00
Tukang batu L.02 OH 0.275 110,000.00 30,250.00
Kepala tukang L.03 OH 0.028 120,000.00 3,360.00
Mandor L.04 OH 0.083 120,000.00 9,960.00
JUMLAH TENAGA KERJA 175,570.00
B BAHAN
Semen portland kg 299.000 1,633.00 488,267.00
Pasir beton kg 799.000 174.55 139,468.30
Kerikil (Maks 30 mm) kg 1,017.000 255.56 259,900.00
Air Liter 215.000 75.00 16,125.00
JUMLAH HARGA BAHAN 903,760.30
C PERALATAN
III - 53
E Overhead & Profit 15.00% 161,899.55
F Harga Satuan Pekerjaan (D+E) 1,241,229.85
CATATAN
Bobot isi pasir = 1.400 kg/m3, Bobot isi kerikil = 1.350 kg/m3, Buckling factor pasir = 20 %
1 MPA = 13.51kg/cm2
III - 54
A.4.1.1.4 Membuat 1 m3 lantai kerja beton mutu f’c = 7,4 MPa slump (3-6) cm, w/c = 0,87
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.200 80,000.00 96,000.00
Tukang batu L.02 OH 0.200 110,000.00 22,000.00
Kepala tukang L.03 OH 0.020 120,000.00 2,400.00
Mandor L.04 OH 0.060 120,000.00 7,200.00
JUMLAH TENAGA KERJA 127,600.00
B BAHAN
Semen Portland kg 230.000 1,633.00 375,590.00
Pasir beton kg 893.000 174.55 155,876.34
Kerikil kg 1,027.000 170.37 174,970.37
(Maks 30 mm)/bukan bt.pecah 2-3
Air Liter 200.000 75.00 15,000.00
JUMLAH HARGA BAHAN 721,436.71
C PERALATAN
A.4.1.1.5. Membuat 1 m3 beton mutu f’c = 14,5 MPa, slump (120 ± 20) mm (sama dengan K 175)
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.650 80,000.00 132,000.00
Tukang batu L.02 OH 0.275 110,000.00 30,250.00
Kepala tukang L.03 OH 0.028 120,000.00 3,360.00
Mandor L.04 OH 0.083 120,000.00 9,960.00
JUMLAH TENAGA KERJA 175,570.00
B BAHAN
Semen Portland kg 326.000 1,633.00 532,358.00
Pasir beton kg 760.000 174.55 132,660.71
Kerikil (Maks kg 1,029.000 255.56 262,966.67
30mm)/menggunakan bt.pecah 2-3
A.4.1.1.6 Membuat 1 m3 beton mutu f’c = 16,9 Mpa (sama dengan K 220)
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.650 80,000.00 132,000.00
Tukang batu L.02 OH 0.275 110,000.00 30,250.00
Kepala tukang L.03 OH 0.028 120,000.00 3,360.00
Mandor L.04 OH 0.083 120,000.00 9,960.00
JUMLAH TENAGA KERJA 175,570.00
B BAHAN
Semen Portland kg 352.000 1,633.00 574,816.00
Pasir beton kg 731.000 174.55 127,598.66
Kerikil (Maks kg 1,031.000 255.56 263,477.78
30mm)
Air Liter 215.000 75.00 16,125.00
JUMLAH HARGA BAHAN 982,017.44
C PERALATAN
III - 55
E Overhead & Profit 15.00% 173,638.12
F Harga Satuan Pekerjaan (D+E) 1,331,225.55
III - 56
A.4.1.1.7. Membuat 1 m3 beton mutu f’c = 19,3 Mpa (sama dengan K 225)
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.650 80,000.00 132,000.00
Tukang batu L.02 OH 0.275 110,000.00 30,250.00
Kepala tukang L.03 OH 0.028 120,000.00 3,360.00
Mandor L.04 OH 0.083 120,000.00 9,960.00
JUMLAH TENAGA KERJA 175,570.00
B BAHAN
Semen Portland kg 371.000 1,633.00 605,843.00
Pasir beton kg 698.000 174.55 121,838.39
Kerikil (Maks kg 1,047.000 255.56 267,566.67
30mm)
Air Liter 215.000 75.00 16,125.00
JUMLAH HARGA BAHAN 1,011,373.06
C PERALATAN
A.4.1.1.8. Membuat 1 m3 beton mutu f’c = 21,7 Mpa (sama dengan K 250)
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.650 80,000.00 132,000.00
Tukang batu L.02 OH 0.275 110,000.00 30,250.00
Kepala tukang L.03 OH 0.028 120,000.00 3,360.00
Mandor L.04 OH 0.083 120,000.00 9,960.00
JUMLAH TENAGA KERJA 175,570.00
B BAHAN
Semen Portland kg 384.000 1,633.00 627,072.00
Pasir beton kg 692.000 174.55 120,791.07
Kerikil kg 1,039.000 255.56 265,522.22
(Maksimum
30mm)
Air Liter 215.000 75.00 16,125.00
JUMLAH HARGA BAHAN 1,029,510.29
C PERALATAN
A.4.1.1.9. Membuat 1 m3 beton mutu f’c = 24,0 Mpa (sama dengan K 325)
Harga Jumlah
Uraian Kode Satuan Koefisien Satuan Harga
No (Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.650 80,000.00 132,000.00
Tukang batu L.02 OH 0.275 110,000.00 30,250.00
Kepala tukang L.03 OH 0.028 120,000.00 3,360.00
Mandor L.04 OH 0.083 120,000.00 9,960.00
JUMLAH TENAGA KERJA 175,570.00
B BAHAN
Semen Portland kg 406.000 1,633.00 662,998.00
Pasir beton kg 684.000 174.55 119,394.64
Kerikil (Maks kg 1,026.000 255.56 262,200.00
30mm)
Air Liter 215.000 75.00 16,125.00
JUMLAH HARGA BAHAN 1,060,717.64
C PERALATAN
III - 57
E Overhead & Profit 15.00% 185,443.15
F Harga Satuan Pekerjaan (D+E) 1,421,730.79
III - 58
A.4.1.1.10. Membuat 1 m3 beton mutu f’c = 26,4 Mpa (sama dengan K 350)
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.650 80,000.00 132,000.00
Tukang batu L.02 OH 0.275 110,000.00 30,250.00
Kepala tukang L.03 OH 0.028 120,000.00 3,360.00
Mandor L.04 OH 0.083 120,000.00 9,960.00
JUMLAH TENAGA KERJA 175,570.00
B BAHAN
Semen Portland kg 413.000 1,633.00 674,429.00
Pasir beton kg 681.000 174.55 118,870.98
Kerikil (Maks kg 1,021.000 255.56 260,922.22
30mm)
Air Liter 215.000 75.00 16,125.00
JUMLAH HARGA BAHAN 1,070,347.20
C PERALATAN
A.4.1.1.11. Membuat 1 m3 beton mutu f’c = 28,8 Mpa (sama dengan K 375)
A.4.1.1.12. Membuat 1 m3 beton mutu f’c = 31,2 MPa, slump (120 ± 20) mm (sama dengan K 425)
III - 59
Untuk pekerjaan beton pracetak yang bisa diangkat 24 jam diperlukan penambahan bahan tambahan
sesuai Tabel berikut:
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 2.100 80,000.00 168,000.00
Tukang batu L.02 OH 0.350 110,000.00 38,500.00
Kepala tukang L.03 OH 0.035 120,000.00 4,200.00
Mandor L.04 OH 0.105 120,000.00 12,600.00
JUMLAH TENAGA KERJA 223,300.00
B BAHAN
Semen Portland kg 448.000 1,633.00 731,584.00
Pasir beton kg 667.000 174.55 116,427.23
Kerikil (maksimum kg 1,000.000 255.56 255,555.56
30 mm)
Bahan tambahan Liter 4.500 155,250.00 698,625.00
kimia (efoksi)
Air Liter 200.000 75.00 15,000.00
JUMLAH HARGA BAHAN 1,817,191.79
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 2.100 80,000.00 168,000.00
Tukang batu L.02 OH 0.350 110,000.00 38,500.00
Kepala tukang L.03 OH 0.035 120,000.00 4,200.00
Mandor L.04 OH 0.105 120,000.00 12,600.00
JUMLAH TENAGA KERJA 223,300.00
B BAHAN
Semen Portland kg 400.000 1,633.00 653,200.00
Pasir beton m3 0.480 244,375.00 117,300.00
Kerikil (2cm/3cm) m3 0.800 230,000.00 184,000.00
Strorox – 100 kg 1.200 87,975.00 105,570.00
JUMLAH HARGA BAHAN 1,060,070.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.060 80,000.00 4,800.00
Tukang Batu/Pipa L.02 OH 0.030 110,000.00 3,300.00
Kepala Tukang L.03 OH 0.003 120,000.00 360.00
Mandor L.04 OH 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 8,820.00
B BAHAN
Waterstop lebar m 1.050 57,500.00 60,375.00
150 mm
JUMLAH HARGA BAHAN 60,375.00
C PERALATAN
III - 60
F Harga Satuan Pekerjaan (D+E) 79,574.25
III - 61
A.4.1.1.15 Pemasangan 1 m’ PVC Waterstop lebar 200 mm
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.070 80,000.00 5,600.00
Tukang Batu/Pipa L.02 OH 0.035 110,000.00 3,850.00
Kepala Tukang L.03 OH 0.004 120,000.00 480.00
Mandor L.04 OH 0.007 120,000.00 840.00
JUMLAH TENAGA KERJA 10,770.00
B BAHAN
Waterstop lebar m 1.050 143,750.00 150,937.50
200 mm
JUMLAH HARGA BAHAN 150,937.50
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.080 80,000.00 6,400.00
Tukang Batu L.02 OH 0.040 110,000.00 4,400.00
Kepala Tukang L.03 OH 0.004 120,000.00 480.00
Mandor L.04 OH 0.004 120,000.00 480.00
JUMLAH TENAGA KERJA 11,760.00
B BAHAN
Waterstop lebar m 1.050 132,250.00 138,862.50
230 mm - 320 mm
JUMLAH HARGA BAHAN 138,862.50
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.070 80,000.00 5,600.00
Tukang besi L.02 OH 0.070 110,000.00 7,700.00
Kepala tukang L.03 OH 0.007 120,000.00 840.00
Mandor L.04 OH 0.004 120,000.00 480.00
JUMLAH TENAGA KERJA 14,620.00
B BAHAN
Besi beton kg 10.500 14,950.00 156,975.00
(polos/ulir)
Kawat beton kg 0.150 40,250.00 6,037.50
JUMLAH HARGA BAHAN 163,012.50
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
III - 62
A TENAGA
Pekerja L.01 OH 0.050 80,000.00 4,000.00
Tukang besi L.02 OH 0.050 110,000.00 5,500.00
Kepala tukang L.03 OH 0.005 120,000.00 600.00
Mandor L.04 OH 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 10,460.00
III - 63
B BAHAN
Besi beton kg 10.500 14,950.00 156,975.00
(polos/ulir)
Kawat beton kg 0.100 40,250.00 4,025.00
JUMLAH HARGA BAHAN 161,000.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.025 80,000.00 2,000.00
Tukang besi L.02 OH 0.025 110,000.00 2,750.00
Kepala tukang L.03 OH 0.025 120,000.00 3,000.00
Mandor L.04 OH 0.001 120,000.00 120.00
JUMLAH TENAGA KERJA 7,870.00
B BAHAN
Jaring kawat kg 10.200 10,580.00 107,916.00
baja dilas
Kawat beton kg 0.050 40,250.00 2,012.50
JUMLAH HARGA BAHAN 109,928.50
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.520 80,000.00 41,600.00
Tukang kayu L.02 OH 0.260 110,000.00 28,600.00
Kepala tukang L.03 OH 0.026 120,000.00 3,120.00
Mandor L.04 OH 0.026 120,000.00 3,120.00
JUMLAH TENAGA KERJA 76,440.00
B BAHAN
Kayu kelas III m3 0.040 4,025,000.00 161,000.00
Paku 5 – 10 cm kg 0.300 23,000.00 6,900.00
Minyak bekisting Liter 0.100 11,500.00 1,150.00
JUMLAH HARGA BAHAN 169,050.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 245,490.00
E Overhead & Profit 15.00% 36,823.50
F Harga Satuan Pekerjaan (D+E) 282,313.50
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.520 80,000.00 41,600.00
Tukang kayu L.02 OH 0.260 110,000.00 28,600.00
Kepala tukang L.03 OH 0.026 120,000.00 3,120.00
Mandor L.04 OH 0.026 120,000.00 3,120.00
JUMLAH TENAGA KERJA 76,440.00
B BAHAN
Kayu kelas III m3 0.045 4,025,000.00 181,125.00
Paku 5 cm – 10 cm kg 0.300 23,000.00 6,900.00
Minyak bekisting Liter 0.100 11,500.00 1,150.00
JUMLAH HARGA BAHAN 189,175.00
C PERALATAN
III - 64
JUMLAH HARGA ALAT -
III - 65
A.4.1.1.22 (K3) Pemasangan 1 m2 bekisting untuk kolom
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.660 80,000.00 52,800.00
Tukang kayu L.02 OH 0.330 110,000.00 36,300.00
Kepala tukang L.03 OH 0.033 120,000.00 3,960.00
Mandor L.04 OH 0.033 120,000.00 3,960.00
JUMLAH TENAGA KERJA 97,020.00
B BAHAN
Kayu kelas III m3 0.040 4,025,000.00 161,000.00
Paku 5 cm – 12 cm kg 0.400 23,000.00 9,200.00
Minyak bekisting Liter 0.200 11,500.00 2,300.00
Balok kayu kelas II m3 0.015 5,750,000.00 86,250.00
Plywood tebal 9 Lbr 0.350 106,087.50 37,130.63
mm
Dolken kayu f 8- Batang 2.000 74,750.00 149,500.00
10cm –panj 4 m
JUMLAH HARGA BAHAN 445,380.63
C PERALATAN
JUMLAH HARGA ALAT -
III - 66
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 841,400.63
E Overhead & Profit 15.00% 126,210.09
F Harga Satuan Pekerjaan (D+E) 967,610.72
III - 67
A.4.1.1.25 (K3) Pemasangan 1 m2 bekisting untuk dinding
III - 68
D Jumlah (A+B+C) 176,495.00
E Overhead & Profit 15.00% 26,474.25
F Harga Satuan Pekerjaan (D+E) 202,969.25
III - 69
A.4.1.1.35 Membuat 1 m’ kolom praktis beton bertulang (11 x 11) cm
Harga Satuan (Rp) Jumlah Harga (Rp)
No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 0.180 80,000.00 14,400.00
Tukang batu L.02 OH 0.020 110,000.00 2,200.00
Tukang kayu L.02 OH 0.020 110,000.00 2,200.00
Tukang besi L.02 OH 0.020 110,000.00 2,200.00
Kepala tukang L.03 OH 0.006 120,000.00 720.00
Mandor L.04 OH 0.009 120,000.00 1,080.00
JUMLAH TENAGA KERJA 22,800.00
B BAHAN
Kayu kelas III m3 0.002 4,025,000.00 8,050.00
Paku 5 cm – 12 cm kg 0.010 23,000.00 230.00
Besi beton polos kg 3.000 14,950.00 44,850.00
Kawat beton kg 0.450 40,250.00 18,112.50
Semen Portland kg 4.000 1,633.00 6,532.00
Pasir Beton m3 0.006 244,375.00 1,466.25
Kerikil m3 0.009 230,000.00 2,070.00
JUMLAH HARGA BAHAN 81,310.75
C PERALATAN
JUMLAH HARGA ALAT -
A.4.1.2.1. (K3) Pembuatan 1 m2 lahan produksi tebal 8 cm beton f’c 14,5 MPa, slump (120 ± 20) mm
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.132 80,000.00 10,560.00
Tukang batu L.02 OH 0.022 110,000.00 2,420.00
Kepala tukang L.03 OH 0.002 120,000.00 240.00
Mandor L.04 OH 0.007 120,000.00 840.00
JUMLAH TENAGA KERJA 14,060.00
B BAHAN
Semen PC Kg 26.080 1,633.00 42,588.64
Pasir beton Kg 60.800 174.55 10,612.86
Kerikil (menggunakan bt. Pecah 2-3) Kg 82.320 255.56 21,037.33
III - 70
JUMLAH HARGA ALAT -
III - 71
A.4.1.2.2. (K3) Pembuatan 1 m2 lahan produksi tebal 10 cm beton f’c 14,5 MPa, slump (120 ± 20) mm
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.165 80,000.00 13,200.00
Tukang batu L.02 OH 0.028 110,000.00 3,080.00
Kepala tukang L.03 OH 0.003 120,000.00 360.00
Mandor L.04 OH 0.008 120,000.00 960.00
JUMLAH TENAGA KERJA 17,600.00
B BAHAN
Semen PC Kg 32.600 1,633.00 53,235.80
Pasir beton Kg 76.000 174.55 13,266.07
Kerikil (maks 30mm) Kg 102.900 255.56 26,296.67
Air L 21.500 75.00 1,612.50
JUMLAH HARGA BAHAN 94,411.04
C PERALATAN
A.4.1.2.3. (K3) Pembuatan 1 m2 lahan produksi tebal 12 cm beton f’c 14,5 MPa, slump (120 ± 20) mm
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.198 80,000.00 15,840.00
Tukang batu L.02 OH 0.033 110,000.00 3,630.00
Kepala tukang L.03 OH 0.003 120,000.00 360.00
Mandor L.04 OH 0.010 120,000.00 1,200.00
JUMLAH TENAGA KERJA 21,030.00
B BAHAN
Semen PC Kg 39.120 1,633.00 63,882.96
Pasir beton Kg 91.200 174.55 15,919.29
Kerikil (maks 30mm) Kg 123.480 255.56 31,556.00
Air L 25.800 75.00 1,935.00
JUMLAH HARGA BAHAN 113,293.25
C PERALATAN
A.4.1.2.4. (K3) Pembuatan 1 m2 lahan produksi tebal 15 cm beton f’c 14,5 MPa, slump (120 ± 20) mm
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.248 80,000.00 19,840.00
Tukang batu L.02 OH 0.041 110,000.00 4,510.00
Kepala tukang L.03 OH 0.004 120,000.00 480.00
Mandor L.04 OH 0.013 120,000.00 1,560.00
JUMLAH TENAGA KERJA 26,390.00
B BAHAN
Semen PC Kg 48.900 1,633.00 79,853.70
Pasir beton Kg 114.000 174.55 19,899.11
Kerikil (maks 30 mm) Kg 154.350 255.56 39,445.00
Air L 32.250 75.00 2,418.75
JUMLAH HARGA BAHAN 141,616.56
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 168,006.56
E Overhead & Profit 15.00% 25,200.98
F Harga Satuan Pekerjaan (D+E) 193,207.54
III - 72
A.4.1.2.5. Pembuatan 1 m2 bekisting untuk pelat beton pracetak ( 5 kali pakai)
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.007 80,000.00 560.00
Tukang kayu L.02 OH 0.076 110,000.00 8,360.00
Kepala tukang L.03 OH 0.008 120,000.00 960.00
Mandor L.04 OH 0.001 120,000.00 120.00
JUMLAH TENAGA KERJA 10,000.00
B BAHAN
Lantai kerja t=10cm m3 0.008 976,392.22 7,811.14
Besi hollow (50 x 50 8,625.00 81,023.25
Kg 9.394
x 3) mm
Kayu kaso 5/7 (lebar 5 cm, tinggi 7 5,750,000.00 28,750.00
m3 0.005
cm)
Phenol film 12 mm Lbr 0.080 281,750.00 22,540.00
Minyak cetakan
L 0.200 11,500.00 2,300.00
(bekisting)
Dinabolt Ø 12mm
buah 3.882 2,990.00 11,607.18
(10 s.d.15 cm)
JUMLAH HARGA BAHAN 154,031.57
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 164,031.57
E Overhead & Profit 15.00% 24,604.74
F Harga Satuan Pekerjaan (D+E) 188,636.30
A.4.1.2.6 Pembuatan 1 m2 bekisting untuk balok beton pracetak (10-12 kali pakai)
A.4.1.2.7. Pembuatan 1 m2 bekisting untuk kolom beton pracetak (10-12 kali pakai)
III - 73
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 47,054.07
E Overhead & Profit 15.00% 7,058.11
F Harga Satuan Pekerjaan (D+E) 54,112.18
III - 74
A.4.1.2.8.
Pemasangan dan membuka bekisting 1 buah komponen pelat beton pracetak
A.4.1.2.9. Pemasangan dan membuka bekisting 1 buah komponen balok beton pracetak
A.4.1.2.10. Pemasangan dan membuka bekisting 1 buah komponen kolom beton pracetak
III - 75
F Harga Satuan Pekerjaan (D+E) 67,712.00
III - 76
A.4.1.2.12. Penuangan/menebar beton 1 m3 komponen untuk balok pracetak
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.069 80,000.00 5,520.00
Tukang batu L.02 OH 0.242 110,000.00 26,620.00
Tukang vibrator L.02 OH 0.138 110,000.00 15,180.00
Kepala tukang L.03 OH 0.037 120,000.00 4,440.00
Mandor L.04 OH 0.073 120,000.00 8,760.00
JUMLAH TENAGA KERJA 60,520.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.061 80,000.00 4,880.00
Tukang batu L.02 OH 0.213 110,000.00 23,430.00
Tukang vibrator L.02 OH 0.122 110,000.00 13,420.00
Kepala tukang L.03 OH 0.033 120,000.00 3,960.00
Mandor/Supervisor/ L.04 OH 0.073 120,000.00 8,760.00
Penyelia
JUMLAH TENAGA KERJA 54,450.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Operator crane L.08 OH 0.067 140,000.00 9,380.00
Pembantu operator 80,000.00 5,360.00
L.09 OH 0.067
crane
Pekerja L.01 OH 0.067 80,000.00 5,360.00
Tukang batu L.02 OH 0.067 110,000.00 7,370.00
Tukang ereksi L.02 OH 0.134 110,000.00 14,740.00
Kepala tukang L.03 OH 0.067 120,000.00 8,040.00
Mandor L.04 OH 0.067 120,000.00 8,040.00
JUMLAH TENAGA KERJA 58,290.00
B BAHAN
Solar L 6.676 7,072.50 47,216.01
JUMLAH HARGA BAHAN 47,216.01
C PERALATAN
Sewa crane unit hari 0.067 4,485,000.00 300,495.00
Sewa pipe support buah 1.100 341,550.00 375,705.00
hari
JUMLAH HARGA ALAT 676,200.00
III - 77
Indeks kenaikan lantai ereksi komponen untuk pelat pracetak
Indeks kenaikan lantai Indeks
La ereksi pelat Lantai kenaikan
nta lantai
i ereksi
pelat
1 1 13 1.114
2 1 14 1.134
3 1 15 1.155
4 1 16 1.176
5 1 17 1.197
6 1 18 1.219
7 1 19 1.241
8 1.018 20 1.264
9 1.037 21 1.287
10 1.055 22 1.310
11 1.075 23 1.334
12 1.094 24 1.358
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Operator crane L.08 OH 0.061 140,000.00 8,540.00
Pembantu operator crane L.09 OH 0.061 80,000.00 4,880.00
Pekerja L.01 OH 0.061 80,000.00 4,880.00
Tukang batu L.02 OH 0.061 110,000.00 6,710.00
Tukang ereksi L.02 OH 0.122 110,000.00 13,420.00
Kepala tukang L.03 OH 0.061 120,000.00 7,320.00
Mandor L.04 OH 0.061 120,000.00 7,320.00
JUMLAH TENAGA KERJA 53,070.00
B BAHAN
Solar L 6.110 7,072.50 43,212.98
JUMLAH HARGA BAHAN 43,212.98
C PERALATAN
Sewa crane unit 0.061 4,485,000.00 273,585.00
hari
Sewa scaffolding unit 1.100 341,550.00 375,705.00
hari
JUMLAH HARGA ALAT 649,290.00
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Operator crane L.08 OH 0.083 140,000.00 11,620.00
Pembantu operator L.09 OH 0.083 80,000.00 6,640.00
crane
Pekerja L.01 OH 0.083 80,000.00 6,640.00
III - 78
Tukang batu L.02 OH 0.083 110,000.00 9,130.00
Tukang ereksi L.02 OH 0.166 110,000.00 18,260.00
Kepala tukang L.03 OH 0.083 120,000.00 9,960.00
Mandor L.04 OH 0.083 120,000.00 9,960.00
JUMLAH TENAGA KERJA 72,210.00
III - 79
B BAHAN
Solar L 8.277 7,072.50 58,539.08
JUMLAH HARGA BAHAN 58,539.08
C PERALATAN
Sewa crane unit hari 0.083 4,485,000.00 372,255.00
Sewa pipe support buah hari 2.200 341,550.00 751,410.00
JUMLAH HARGA ALAT 1,123,665.00
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Operator crane L.08 OH 0.019 140,000.00 2,660.00
Pembantu operator L.09 OH 0.019 80,000.00 1,520.00
crane
Pekerja L.01 OH 0.019 80,000.00 1,520.00
Tukang batu L.02 OH 0.038 110,000.00 4,180.00
JUMLAH TENAGA KERJA 9,880.00
B BAHAN
Solar L 1.897 7,072.50 13,416.53
JUMLAH HARGA BAHAN 13,416.53
C PERALATAN
Sewa crane unit hari 0.019 4,485,000.00 85,215.00
JUMLAH HARGA ALAT 85,215.00
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Operator crane L.08 OH 0.019 140,000.00 2,660.00
Pembantu operator
L.09 OH 0.019 80,000.00 1,520.00
crane
Pekerja L.01 OH 0.019 80,000.00 1,520.00
Tukang batu L.02 OH 0.038 110,000.00 4,180.00
JUMLAH TENAGA KERJA 9,880.00
B BAHAN
Solar L 1.897 7,072.50 13,416.53
JUMLAH HARGA BAHAN 13,416.53
C PERALATAN
Sewa crane unit hari 0.019 4,485,000.00 85,215.00
JUMLAH HARGA ALAT 85,215.00
III - 80
A.4.1.2.19. Langsir 1 buah komponen untuk kolom pracetak ( ± 20 m)
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Operator crane L.08 OH 0.019 140,000.00 2,660.00
Pembantu operator L.09 OH 0.019 80,000.00 1,520.00
crane
Pekerja L.01 OH 0.019 80,000.00 1,520.00
Tukang batu L.02 OH 0.038 110,000.00 4,180.00
JUMLAH TENAGA KERJA 9,880.00
B BAHAN
Solar L 1.897 7,072.50 13,416.53
JUMLAH HARGA BAHAN 13,416.53
C PERALATAN
Sewa crane unit hari 0.019 4,485,000.00 85,215.00
JUMLAH HARGA ALAT 85,215.00
III - 81
JUMLAH HARGA ALAT -
III - 82
A.4.1.2.23. Pemasangan 1 titik bekisting joint pracetak
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.147 80,000.00 11,760.00
Tukang kayu L.02 OH 0.147 110,000.00 16,170.00
Kepala tukang L.03 OH 0.015 120,000.00 1,800.00
Mandor L.04 OH 0.005 120,000.00 600.00
JUMLAH TENAGA KERJA 30,330.00
B BAHAN
Kayu kaso 5/7 (lebar m3 0.012 5,750,000.00 69,000.00
5 cm, tinggi 7 cm)
Papan cor (kayu kelas II) m3 0.004 5,750,000.00 23,000.00
Paku (5 s.d.7) cm Kg 0.264 23,000.00 6,072.00
JUMLAH HARGA BAHAN 98,072.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.220 80,000.00 17,600.00
Tukang kayu L.02 OH 0.022 110,000.00 2,420.00
Tukang besi L.02 OH 0.220 110,000.00 24,200.00
Mandor L.04 OH 0.011 120,000.00 1,320.00
JUMLAH TENAGA KERJA 45,540.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.060 80,000.00 4,800.00
Tukang las L.03 OH 0.060 110,000.00 6,600.00
konstruksi
Kepala tukang L.03 OH 0.006 120,000.00 720.00
Mandor L.04 OH 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 12,480.00
B BAHAN
Besi Profil Kg 1.150 16,100.00 18,515.00
JUMLAH HARGA BAHAN 18,515.00
C PERALATAN
III - 83
A.4.2.1.2. Pemasangan 1 kg rangka kuda-kuda baja IWF
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.060 80,000.00 4,800.00
Tukang las L.03 OH 0.060 110,000.00 6,600.00
konstruksi
Kepala tukang L.03 OH 0.006 120,000.00 720.00
Mandor L.04 OH 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 12,480.00
B BAHAN
Besi baja IWF Kg 1.150 16,100.00 18,515.00
JUMLAH HARGA BAHAN 18,515.00
C PERALATAN
A.4.2.1.4. Pembuatan 1 m2 pintu besi pelat baja tebal 2 mm rangkap, rangka baja siku
Harga Satuan (Rp) Jumlah Harga (Rp)
No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 1.050 80,000.00 84,000.00
Tukang las biasa L.03 OH 1.050 110,000.00 115,500.00
Kepala tukang L.03 OH 0.105 120,000.00 12,600.00
Mandor L.04 OH 0.052 120,000.00 6,240.00
JUMLAH TENAGA KERJA 218,340.00
B BAHAN
Besi siku L 30.30.3 Kg 15.000 12,075.00 181,125.00
Besi pelat baja Kg 32.800 7,475.00 245,180.00
Kawat las Kg 0.050 31,050.00 1,552.50
JUMLAH HARGA BAHAN 427,857.50
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.040 80,000.00 3,200.00
Tukang las (bersertifikat) L.03 OH 0.020 120,000.00 2,400.00
III - 84
Mandor L.04 OH 0.002 120,000.00 240.00
JUMLAH TENAGA KERJA 6,080.00
III - 85
B BAHAN
Kawat las listrik Kg 0.400 31,050.00 12,420.00
Solar Liter 0.300 7,072.50 2,121.75
Minyak pelumas Liter 0.040 11,500.00 460.00
JUMLAH HARGA BAHAN 15,001.75
C PERALATAN
Sewa alat Jam 0.170 132,250.00 22,482.50
JUMLAH HARGA ALAT 22,482.50
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.200 80,000.00 96,000.00
Tukang las biasa L.03 OH 1.200 110,000.00 132,000.00
Kepala tukang L.03 OH 0.120 120,000.00 14,400.00
Mandor L.04 OH 0.006 120,000.00 720.00
JUMLAH TENAGA KERJA 243,120.00
B BAHAN
Pintu gulung besi m2 1.000 1,122,400.00 1,122,400.00
JUMLAH HARGA BAHAN 1,122,400.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.440 80,000.00 35,200.00
Tukang L.03 OH 0.440 110,000.00 48,400.00
Kepala tukang L.03 OH 0.044 120,000.00 5,280.00
Mandor L.04 OH 0.022 120,000.00 2,640.00
JUMLAH TENAGA KERJA 91,520.00
B BAHAN
Pintu lipat m2 1.000 3,116,500.00 3,116,500.00
JUMLAH HARGA BAHAN 3,116,500.00
C PERALATAN
III - 86
D Jumlah (A+B+C) 3,208,020.00
E Overhead & Profit 15.00% 481,203.00
F Harga Satuan Pekerjaan (D+E) 3,689,223.00
III - 87
A.4.2.1.9. Pemasangan 1 m2 sunscreen alluminium
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.080 80,000.00 6,400.00
Tukang L.03 OH 0.800 110,000.00 88,000.00
Kepala tukang L.03 OH 0.080 120,000.00 9,600.00
Mandor L.04 OH 0.004 120,000.00 480.00
JUMLAH TENAGA KERJA 104,480.00
B BAHAN
Sunscreen alluminium m2 1.000 442,750.00 442,750.00
JUMLAH HARGA BAHAN 442,750.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.085 80,000.00 6,800.00
III - 88
Tukang khusus L.03 OH 0.085 110,000.00 9,350.00
alumunium
Kepala tukang L.03 OH 0.009 120,000.00 1,080.00
Mandor L.04 OH 0.005 120,000.00 600.00
JUMLAH TENAGA KERJA 17,830.00
III - 89
B BAHAN
Pintu alluminium m 4.400 126,500.00 556,600.00
Profil kaca m 4.500 14,260.00 64,170.00
Sealant Tube 0.270 23,000.00 6,210.00
JUMLAH HARGA BAHAN 626,980.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.350 80,000.00 28,000.00
Tukang L.03 OH 0.350 110,000.00 38,500.00
Kepala tukang L.03 OH 0.035 120,000.00 4,200.00
Mandor L.04 OH 0.018 120,000.00 2,160.00
JUMLAH TENAGA KERJA 72,860.00
B BAHAN
Venetions blinds dan m2 1.000 122,130.00 122,130.00
vertical blinds (tirai)
JUMLAH HARGA BAHAN 122,130.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.670 80,000.00 133,600.00
Tukang las L.03 OH 1.670 110,000.00 183,700.00
Kepala tukang L.03 OH 0.167 120,000.00 20,040.00
Mandor L.04 OH 0.083 120,000.00 9,960.00
JUMLAH TENAGA KERJA 347,300.00
B BAHAN
Besi strip kg 6.177 15,812.50 97,673.81
Pengelasan cm 27.080 5,060.00 137,024.80
JUMLAH HARGA BAHAN 234,698.61
C PERALATAN
III - 90
JUMLAH HARGA ALAT -
III - 91
A.4.2.1.17. Pemasangan 1 m2 jendela nako & tralis
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.200 80,000.00 16,000.00
Tukang L.03 OH 0.200 110,000.00 22,000.00
Kepala tukang L.03 OH 0.020 120,000.00 2,400.00
Mandor L.04 OH 0.001 120,000.00 120.00
JUMLAH TENAGA KERJA 40,520.00
B BAHAN
Jendela nako m2 1.100 187,680.00 206,448.00
(rangka + kaca 5 mm)
Paku skrup buah 10.000 460.00 4,600.00
1 cm – 2,5 cm
Besi strip m 7.000 15,812.50 110,687.50
JUMLAH HARGA BAHAN 321,735.50
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.200 80,000.00 16,000.00
Tukang L.03 OH 0.200 110,000.00 22,000.00
Kepala tukang L.03 OH 0.020 120,000.00 2,400.00
Mandor L.04 OH 0.001 120,000.00 120.00
JUMLAH TENAGA KERJA 40,520.00
B BAHAN
Seng pelat m 1.050 43,700.00 45,885.00
Paku 1 cm - 2,5 cm kg 0.015 23,000.00 345.00
Papan kayu kelas II
m3 0.019 4,025,000.00 76,475.00
atau III
JUMLAH HARGA BAHAN 122,705.00
C PERALATAN
A.4.2.1.19 Pemasangan 1 m talang ½ lingkaran D-15 cm, seng pelat bjls 30 lebar 45 cm
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.150 80,000.00 12,000.00
Tukang L.03 OH 0.300 110,000.00 33,000.00
Kepala tukang L.03 OH 0.030 120,000.00 3,600.00
Mandor L.04 OH 0.008 120,000.00 960.00
JUMLAH TENAGA KERJA 49,560.00
B BAHAN
Seng pelat m 1.050 43,700.00 45,885.00
Paku 1 cm – 2,5 cm kg 0.010 23,000.00 230.00
Besi strip kg 0.500 15,812.50 7,906.25
JUMLAH HARGA BAHAN 54,021.25
C PERALATAN
III - 92
F Harga Satuan Pekerjaan (D+E) 119,118.44
III - 93
A.4.2.1.20. Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x 120 cm, untuk partisi
A.4.2.1.21. Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x 60 cm, untuk plafon
A.4.2.1.22. (K3) Pemasangan 1 m2 atap pelana rangka atap baja canai dingin profil C75
III - 94
A.4.2.1.22. (K3) Pemasangan 1 m2 atap jurai rangka atap baja canai dingin profil C75
A. 4.4.1.1. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 2PP
A. 4.4.1.2. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 3PP
III - 95
A. 4.4.1.3. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 4PP
No Uraian Kode Satuan Koefisien Harga Jumlah
Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.600 80,000.00 48,000.00
Tukang batu L.02 OH 0.200 110,000.00 22,000.00
Kepala bukang L.03 OH 0.020 120,000.00 2,400.00
Mandor L.04 OH 0.030 120,000.00 3,600.00
JUMLAH TENAGA KERJA 76,000.00
B BAHAN
Bata merah buah 140.000 900.00 126,000.00
Semen Portland Kg 26.550 1,633.00 43,356.15
Pasir Pasang m3 0.093 222,812.50 20,721.56
JUMLAH HARGA BAHAN 190,077.71
C PERALATAN
JUMLAH HARGA ALAT -
A. 4.4.1.4. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 5PP
No Uraian Kode Satuan Koefisien Harga Jumlah
Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.600 80,000.00 48,000.00
Tukang batu L.02 OH 0.200 110,000.00 22,000.00
Kepala tukang L.03 OH 0.020 120,000.00 2,400.00
Mandor L.04 OH 0.030 120,000.00 3,600.00
JUMLAH TENAGA KERJA 76,000.00
B BAHAN
Bata merah buah 140.000 900.00 126,000.00
Semen Portland Kg 22.200 1,633.00 36,252.60
Pasir pasang m3 0.102 222,812.50 22,726.88
JUMLAH HARGA BAHAN 184,979.48
C PERALATAN
JUMLAH HARGA ALAT -
A. 4.4.1.5 Pemasangan 1m2 Dinding Bata Merah (5x11x22) cm tebal 1 batu campuran 1SP : 6PP
No Uraian Kode Satuan Koefisien Harga Jumlah
Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.600 80,000.00 48,000.00
Tukang batu L.02 OH 0.200 110,000.00 22,000.00
Kepala tukang L.03 OH 0.020 120,000.00 2,400.00
Mandor L.04 OH 0.030 120,000.00 3,600.00
JUMLAH TENAGA KERJA 76,000.00
B BAHAN
Bata merah buah 140.000 900.00 126,000.00
Semen Portland Kg 18.500 1,633.00 30,210.50
Pasir pasang m3 0.122 222,812.50 27,183.13
JUMLAH HARGA BAHAN 183,393.63
C PERALATAN
A. 4.4.1.6 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 3KP : 10PP
No Uraian Kode Satuan Koefisien Harga Jumlah
Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.600 80,000.00 48,000.00
Tukang batu L.02 OH 0.200 110,000.00 22,000.00
Kepala tukang L.03 OH 0.020 120,000.00 2,400.00
Mandor L.04 OH 0.030 120,000.00 3,600.00
III - 96
JUMLAH TENAGA KERJA 76,000.00
III - 97
B BAHAN
Bata merah buah 140.000 900.00 126,000.00
Semen Portland Kg 10.080 1,633.00 16,460.64
Kapur padam m3 0.028 253,000.00 6,957.50
Pasir pasang m3 0.093 222,812.50 20,610.16
JUMLAH HARGA BAHAN 170,028.30
C PERALATAN
A. 4.4.1.7 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 2PP
No Uraian Kode Satuan Koefisien Harga Jumlah
Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.300 80,000.00 24,000.00
Tukang batu L.02 OH 0.100 110,000.00 11,000.00
Kepala tukang L.03 OH 0.010 120,000.00 1,200.00
Mandor L.04 OH 0.015 120,000.00 1,800.00
JUMLAH TENAGA KERJA 38,000.00
B BAHAN
Bata merah buah 70.000 900.00 63,000.00
Semen Portland Kg 18.950 1,633.00 30,945.35
Pasir pasang m3 0.038 222,812.50 8,466.88
JUMLAH HARGA BAHAN 102,412.23
C PERALATAN
A. 4.4.1.8 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 3PP
No Uraian Kode Satuan Koefisien Harga Jumlah
Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.300 80,000.00 24,000.00
Tukang batu L.02 OH 0.100 110,000.00 11,000.00
Kepala tukang L.03 OH 0.010 120,000.00 1,200.00
Mandor L.04 OH 0.015 120,000.00 1,800.00
JUMLAH TENAGA KERJA 38,000.00
B BAHAN
Bata merah buah 70.000 900.00 63,000.00
Semen Portland Kg 14.370 1,633.00 23,466.21
Pasir pasang m3 0.040 222,812.50 8,912.50
JUMLAH HARGA BAHAN 95,378.71
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 133,378.71
E Overhead & Profit 15.00% 20,006.81
F Harga Satuan Pekerjaan (D+E) 153,385.52
A.4.4.1.9 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP :4PP
III - 98
JUMLAH HARGA ALAT -
III - 99
A. 4.4.1.10 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP :5PP
No Uraian Kode Satuan Koefisien Harga Jumlah
Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.300 80,000.00 24,000.00
Tukang batu L.02 OH 0.100 110,000.00 11,000.00
Kepala tukang L.03 OH 0.010 120,000.00 1,200.00
Mandor L.04 OH 0.015 120,000.00 1,800.00
JUMLAH TENAGA KERJA 38,000.00
B BAHAN
Bata merah buah 70.000 900.00 63,000.00
Semen Portland Kg 9.680 1,633.00 15,807.44
Pasir pasang m3 0.045 222,812.50 10,026.56
JUMLAH HARGA BAHAN 88,834.00
C PERALATAN
A. 4.4.1.11 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 6PP
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.300 80,000.00 24,000.00
Tukang batu L.02 OH 0.100 110,000.00 11,000.00
Kepala tukang L.03 OH 0.010 120,000.00 1,200.00
Mandor L.04 OH 0.015 120,000.00 1,800.00
JUMLAH TENAGA KERJA 38,000.00
B BAHAN
Bata merah buah 70.000 900.00 63,000.00
Semen Portland Kg 8.320 1,633.00 13,586.56
Pasir pasang m3 0.049 222,812.50 10,917.81
JUMLAH HARGA BAHAN 87,504.37
C PERALATAN
A. 4.4.1.12 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SP :8PP
III - 100
A. 4.4.1.13 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SP : 3KP :10PP
A. 4.4.1.14 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SM : 1KP :1PP
A. 4.4.1.15 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SM : 1KP :2PP
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.300 80,000.00 24,000.00
Tukang batu L.02 OH 0.100 110,000.00 11,000.00
Kepala tukang L.03 OH 0.010 120,000.00 1,200.00
Mandor L.04 OH 0.015 120,000.00 1,800.00
JUMLAH TENAGA KERJA 38,000.00
B BAHAN
Bata merah buah 70.000 900.00 63,000.00
Semen merah Kg 0.014 1,633.00 22.86
Kapur padam m3 0.014 253,000.00 3,542.00
Pasir pasang m3 0.028 222,812.50 6,238.75
JUMLAH HARGA BAHAN 72,803.61
C PERALATAN
III - 101
A. 4.4.1.16 rob Pemasangan 1m2 dinding conblock HB20 campuran 1SP : 3PP
A. 4.4.1.17 rob Pemasangan 1m2 dinding conblock HB20 campuran 1SP : 4PP
A. 4.4.1.18 rob Pemasangan 1m2 dinding conblock HB15 campuran 1SP : 3PP
III - 102
HB15: Hollow Block tebal 15cm
III - 103
A. 4.4.1.19 rob Pemasangan 1 m2 dinding conblock HB15 campuran 1SP :4PP
III - 104
A. 4.4.1.22 Pemasangan 1 m2 dinding terawang (rooster) 12x11x24 campuran 1SP :3PP
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.300 80,000.00 24,000.00
Tukang batu L.02 OH 0.100 110,000.00 11,000.00
Kepala tukang L.03 OH 0.010 120,000.00 1,200.00
Mandor L.04 OH 0.015 120,000.00 1,800.00
JUMLAH TENAGA KERJA 38,000.00
B BAHAN
Bata rooster m3 30.000 2,800.00 84,000.00
Semen Portland Kg 11.000 1,633.00 17,963.00
Pasir pasang m3 0.035 222,812.50 7,798.44
JUMLAH HARGA BAHAN 109,761.44
C PERALATAN
A. 4.4.1.23 Pemasangan 1 cm2 dinding terawang (rooster) 12x11x24 campuran 1SP :4PP
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.300 80,000.00 24,000.00
Tukang batu L.02 OH 0.100 110,000.00 11,000.00
Kepala tukang L.03 OH 0.010 120,000.00 1,200.00
Mandor L.04 OH 0.015 120,000.00 1,800.00
JUMLAH TENAGA KERJA 38,000.00
B BAHAN
Bata berongga m3 30.000 2,800.00 84,000.00
Semen Portland Kg 11.000 1,633.00 17,963.00
Pasir pasang m3 0.035 222,812.50 7,798.44
JUMLAH HARGA BAHAN 109,761.44
C PERALATAN
A. 4.4.1.25 Pemasangan 1 m2 dinding bata ringan tebal 7,5 cm dengan mortar siap pakai
III - 105
A. 4.4.1.26 Pemasangan 1m2 dinding bata ringan tebal 10 cm dengan mortar siap pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.671 80,000.00 53,680.00
Tukang batu L.02 OH 1.300 110,000.00 143,000.00
Kepala tukang L.03 OH 0.130 120,000.00 15,600.00
Mandor L.04 OH 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 212,640.00
B BAHAN
Bata ringan tebal 10cm buah 8.400 6,000.00 50,400.00
Mortar siap pakai Kg 0.063 4,312.50 271.69
JUMLAH HARGA BAHAN 50,671.69
C PERALATAN
Peralatan % 0.100 -
JUMLAH HARGA ALAT -
III - 106
A.4.4.2.3. Pemasangan 1 m2 plesteran 1SP : 3PP tebal 15mm
III - 107
Pekerja L.01 OH 0.300 80,000.00 24,000.00
Tukang batu L.03 OH 0.150 110,000.00 16,500.00
Kepala tukang L.03 OH 0.015 120,000.00 1,800.00
Mandor L.04 OH 0.015 120,000.00 1,800.00
JUMLAH TENAGA KERJA 44,100.00
III - 108
B BAHAN
PC Kg 4.416 1,633.00 7,211.33
PP m3 0.027 222,812.50 6,015.94
JUMLAH HARGA BAHAN 13,227.27
C PERALATAN
III - 109
JUMLAH HARGA ALAT -
III - 110
A.4.4.2.10. Pemasangan 1 m2 plesteran 1SP : 2KP : 8PP tebal 15 mm
III - 111
A.4.4.2.13. Pemasangan 1 m2 plesteran 1SP : 1PP tebal 20 mm
III - 112
Pekerja L.01 OH 0.400 80,000.00 32,000.00
Tukang batu L.03 OH 0.200 110,000.00 22,000.00
Kepala tukang L.03 OH 0.020 120,000.00 2,400.00
Mandor L.04 OH 0.022 120,000.00 2,640.00
JUMLAH TENAGA KERJA 59,040.00
III - 113
B BAHAN
PC Kg 6.912 1,633.00 11,287.30
PP m3 0.035 222,812.50 7,798.44
JUMLAH HARGA BAHAN 19,085.73
C PERALATAN
III - 114
JUMLAH HARGA ALAT -
III - 115
A.4.4.2.20. Pemasangan 1 m’ plesteran skoning 1SP : 3PP lebar 10 cm
III - 116
A TENAGA
Pekerja L.01 OH 0.300 80,000.00 24,000.00
Tukang batu L.03 OH 0.100 110,000.00 11,000.00
Kepala tukang L.03 OH 0.010 120,000.00 1,200.00
Mandor L.04 OH 0.015 120,000.00 1,800.00
JUMLAH TENAGA KERJA 38,000.00
III - 117
B BAHAN
Semen PC Kg 4.320 1,633.00 7,054.56
Pasir pasang m3 0.006 222,812.50 1,336.88
JUMLAH HARGA BAHAN 8,391.44
C PERALATAN
A.4.4.2.26. Pemasangan 1 m2 finishing siar pasangan batu kali, campuran 1SP : 2PP
III - 118
D Jumlah (A+B+C) 57,126.97
E Overhead & Profit 15.00% 8,569.05
F Harga Satuan Pekerjaan (D+E) 65,696.02
III - 119
A.4.4.2.27. Pemasangan 1 m2 acian
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.250 80,000.00 20,000.00
Tukang batu L.02 OH 0.125 110,000.00 13,750.00
Kepala tukang L.03 OH 0.013 120,000.00 1,560.00
Mandor L.04 OH 0.013 120,000.00 1,560.00
JUMLAH TENAGA KERJA 36,870.00
B BAHAN
Ubin abu-abu Bh 11.870 2,875.00 34,126.25
Semen Portland kg 10.000 1,633.00 16,330.00
Pasir pasang M3 0.045 222,812.50 10,026.56
JUMLAH HARGA BAHAN 60,482.81
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.270 80,000.00 21,600.00
Tukang batu L.02 OH 0.135 110,000.00 14,850.00
Kepala tukang L.03 OH 0.014 120,000.00 1,680.00
Mandor L.04 OH 0.014 120,000.00 1,680.00
JUMLAH TENAGA KERJA 39,810.00
B BAHAN
Ubin abu-abu buah 26.500 2,300.00 60,950.00
Semen Portland kg 10.400 1,633.00 16,983.20
Pasir pasang M3 0.045 222,812.50 10,026.56
JUMLAH HARGA BAHAN 87,959.76
C PERALATAN
III - 120
III - 121
A.4.4.3.5. Pemasangan 1 m2 lantai ubin warna ukuran 30 cm x 30 cm
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.260 80,000.00 20,800.00
Tukang batu L.02 OH 0.130 110,000.00 14,300.00
Kepala tukang L.03 OH 0.013 120,000.00 1,560.00
Mandor L.04 OH 0.013 120,000.00 1,560.00
JUMLAH TENAGA KERJA 38,220.00
B BAHAN
Ubin warna Bh 11.870 3,335.00 39,586.45
Semen Portland kg 10.000 1,633.00 16,330.00
Semen warna Kg 0.600 6,900.00 4,140.00
Pasir pasang M3 0.045 222,812.50 10,026.56
JUMLAH HARGA BAHAN 70,083.01
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.270 80,000.00 21,600.00
Tukang batu L.02 OH 0.135 110,000.00 14,850.00
Kepala tukang L.03 OH 0.014 120,000.00 1,680.00
Mandor L.04 OH 0.014 120,000.00 1,680.00
JUMLAH TENAGA KERJA 39,810.00
B BAHAN
Ubin warna Bh 26.500 2,645.00 70,092.50
Semen Portland kg 10.400 1,633.00 16,983.20
Semen warna Kg 1.000 6,900.00 6,900.00
Pasir pasang M3 0.045 222,812.50 10,026.56
JUMLAH HARGA BAHAN 104,002.26
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.250 80,000.00 20,000.00
Tukang batu L.02 OH 0.125 110,000.00 13,750.00
Kepala tukang L.03 OH 0.013 120,000.00 1,560.00
Mandor L.04 OH 0.013 120,000.00 1,560.00
JUMLAH TENAGA KERJA 36,870.00
B BAHAN
Ubin granit Bh 6.630 64,630.00 428,496.90
Semen Portland kg 9.800 1,633.00 16,003.40
Semen warna Kg 1.300 6,900.00 8,970.00
Pasir pasang M3 0.045 222,812.50 10,026.56
JUMLAH HARGA BAHAN 463,496.86
C PERALATAN
III - 122
III - 123
A.4.4.3.32. Pemasangan 1m2 lantai keramik artistik 10 cm x 20 cm
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.700 80,000.00 56,000.00
Tukang batu L.02 OH 0.350 110,000.00 38,500.00
Kepala tukang L.03 OH 0.035 120,000.00 4,200.00
Mandor L.04 OH 0.035 120,000.00 4,200.00
JUMLAH TENAGA KERJA 102,900.00
B BAHAN
Ubin keramik Bh 53.000 1,150.00 60,950.00
Semen Portland Kg 8.190 1,633.00 13,374.27
Pasir pasang M3 0.045 222,812.50 10,026.56
Semen warna Kg 2.750 6,900.00 18,975.00
JUMLAH HARGA BAHAN 103,325.83
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.700 80,000.00 56,000.00
Tukang batu L.02 OH 0.350 110,000.00 38,500.00
Kepala tukang L.03 OH 0.035 120,000.00 4,200.00
Mandor L.04 OH 0.035 120,000.00 4,200.00
JUMLAH TENAGA KERJA 102,900.00
B BAHAN
Ubin keramik Doos 1.050 53,130.00 55,786.50
Semen Portland Kg 10.000 1,633.00 16,330.00
Pasir pasang M3 0.045 222,812.50 10,026.56
Semen warna Kg 0.500 6,900.00 3,450.00
JUMLAH HARGA BAHAN 85,593.06
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.700 80,000.00 56,000.00
Tukang batu L.02 OH 0.350 110,000.00 38,500.00
Kepala tukang L.03 OH 0.035 120,000.00 4,200.00
Mandor L.04 OH 0.035 120,000.00 4,200.00
JUMLAH TENAGA KERJA 102,900.00
B BAHAN
Ubin keramik Doos 1.050 186,875.00 196,218.75
Semen Portland Kg 10.400 1,633.00 16,983.20
Pasir pasang M3 0.045 222,812.50 10,026.56
Semen warna Kg 0.500 6,900.00 3,450.00
JUMLAH HARGA BAHAN 226,678.51
C PERALATAN
III - 124
III - 125
A.4.4.3.38. Pemasangan 1m2 lantai keramik mozaik ukuran 30 cm x 30 cm
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.700 80,000.00 56,000.00
Tukang batu L.02 OH 0.350 110,000.00 38,500.00
Kepala tukang L.03 OH 0.035 120,000.00 4,200.00
Mandor L.04 OH 0.035 120,000.00 4,200.00
JUMLAH TENAGA KERJA 102,900.00
B BAHAN
Ubin keramik Bh 11.870 4,600.00 54,602.00
Semen Portland Kg 14.150 1,633.00 23,106.95
Pasir pasang M3 0.039 222,812.50 8,689.69
Semen warna Kg 2.000 6,900.00 13,800.00
JUMLAH HARGA BAHAN 100,198.64
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.090 80,000.00 7,200.00
Tukang batu L.02 OH 0.090 110,000.00 9,900.00
Kepala tukang L.03 OH 0.035 120,000.00 4,200.00
Mandor L.04 OH 0.005 120,000.00 600.00
JUMLAH TENAGA KERJA 21,900.00
B BAHAN
Plint keramik Bh 5.300 13,800.00 73,140.00
Semen Portland Kg 1.140 1,633.00 1,861.62
Pasir pasang M3 0.003 222,812.50 668.44
Semen warna Kg 0.025 6,900.00 172.50
JUMLAH HARGA BAHAN 75,842.56
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.090 80,000.00 7,200.00
Tukang batu L.02 OH 0.090 110,000.00 9,900.00
Kepala tukang L.03 OH 0.035 120,000.00 4,200.00
Mandor L.04 OH 0.005 120,000.00 600.00
JUMLAH TENAGA KERJA 21,900.00
B BAHAN
Plint keramik Bh 10.600 10,350.00 109,710.00
Semen Portland Kg 1.140 1,633.00 1,861.62
Pasir pasang M3 0.003 222,812.50 668.44
Semen warna Kg 0.050 6,900.00 345.00
JUMLAH HARGA BAHAN 112,585.06
C PERALATAN
III - 126
A.4.4.3.41. Pemasangan 1 m’ plint keramik ukuran 5 cm x 20 cm
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.090 80,000.00 7,200.00
Tukang batu L.02 OH 0.090 110,000.00 9,900.00
Kepala tukang L.03 OH 0.035 120,000.00 4,200.00
Mandor L.04 OH 0.005 120,000.00 600.00
JUMLAH TENAGA KERJA 21,900.00
B BAHAN
Plint keramik Bh 5.300 10,350.00 54,855.00
Semen Portland Kg 0.570 1,633.00 930.81
Pasir pasang M3 0.002 222,812.50 334.22
Semen warna Kg 0.013 6,900.00 89.70
JUMLAH HARGA BAHAN 56,209.73
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.750 80,000.00 60,000.00
Tukang batu L.02 OH 0.750 110,000.00 82,500.00
Kepala tukang L.03 OH 0.075 120,000.00 9,000.00
Mandor L.04 OH 0.038 120,000.00 4,560.00
JUMLAH TENAGA KERJA 156,060.00
B BAHAN
Internal cove Bh 5.300 17,250.00 91,425.00
Semen Portland Kg 1.140 1,633.00 1,861.62
Pasir pasang M3 0.003 222,812.50 668.44
Semen warna Kg 0.100 6,900.00 690.00
JUMLAH HARGA BAHAN 94,645.06
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.700 80,000.00 56,000.00
Tukang batu L.02 OH 0.350 110,000.00 38,500.00
Kepala tukang L.03 OH 0.035 120,000.00 4,200.00
Mandor L.04 OH 0.035 120,000.00 4,200.00
JUMLAH TENAGA KERJA 102,900.00
B BAHAN
Marmer Bh 1.060 920,000.00 975,200.00
Semen Portland Kg 8.190 1,633.00 13,374.27
Pasir pasang M3 0.045 222,812.50 10,026.56
Semen warna Kg 0.134 6,900.00 924.60
JUMLAH HARGA BAHAN 999,525.43
C PERALATAN
III - 127
A.4.4.3.44. Pemasangan 1 m2 lantai karpet
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.170 80,000.00 13,600.00
Tukang kayu L.02 OH 0.170 110,000.00 18,700.00
Kepala tukang L.03 OH 0.017 120,000.00 2,040.00
Mandor L.04 OH 0.009 120,000.00 1,080.00
JUMLAH TENAGA KERJA 35,420.00
B BAHAN
Karpet m2 1.050 115,000.00 120,750.00
Lem Kg 0.350 78,775.00 27,571.25
JUMLAH HARGA BAHAN 148,321.25
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.120 80,000.00 9,600.00
Tukang kayu L.02 OH 0.120 110,000.00 13,200.00
Kepala tukang L.03 OH 0.012 120,000.00 1,440.00
Mandor L.04 OH 0.006 120,000.00 720.00
JUMLAH TENAGA KERJA 24,960.00
B BAHAN
Underlayer m2 1.050 57,500.00 60,375.00
Lem Kg 0.350 78,775.00 27,571.25
JUMLAH HARGA BAHAN 87,946.25
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.700 80,000.00 56,000.00
Tukang kayu L.02 OH 0.350 110,000.00 38,500.00
Kepala tukang L.03 OH 0.035 120,000.00 4,200.00
Mandor L.04 OH 0.035 120,000.00 4,200.00
JUMLAH TENAGA KERJA 102,900.00
B BAHAN
Parquet m2 1.050 172,500.00 181,125.00
Lem Kg 0.600 78,775.00 47,265.00
JUMLAH HARGA BAHAN 228,390.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.700 80,000.00 56,000.00
III - 128
Tukang kayu L.02 OH 0.350 110,000.00 38,500.00
Kepala tukang L.03 OH 0.035 120,000.00 4,200.00
Mandor L.04 OH 0.035 120,000.00 4,200.00
JUMLAH TENAGA KERJA 102,900.00
III - 129
B BAHAN
Parquet m2 1.050 172,500.00 181,125.00
Lem Kg 0.600 78,775.00 47,265.00
JUMLAH HARGA BAHAN 228,390.00
C PERALATAN
III - 130
C PERALATAN
III - 131
A.4.4.3.52. Pemasangan 1 m2 dinding keramik artistik 5 cm x 20 cm
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.900 80,000.00 72,000.00
Tukang batu L.02 OH 0.450 110,000.00 49,500.00
Kepala tukang L.03 OH 0.045 120,000.00 5,400.00
Mandor L.04 OH 0.045 120,000.00 5,400.00
JUMLAH TENAGA KERJA 132,300.00
B BAHAN
Keramik artistik buah 106.000 1,955.00 207,230.00
Semen Portland Kg 9.300 1,633.00 15,186.90
Pasir pasang M3 0.018 222,812.50 4,010.63
Semen warna Kg 2.900 6,900.00 20,010.00
JUMLAH HARGA BAHAN 246,437.53
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.900 80,000.00 72,000.00
Tukang batu L.02 OH 0.450 110,000.00 49,500.00
Kepala tukang L.03 OH 0.045 120,000.00 5,400.00
Mandor L.04 OH 0.045 120,000.00 5,400.00
JUMLAH TENAGA KERJA 132,300.00
B BAHAN
Keramik artistik buah 53.000 1,150.00 60,950.00
Semen Portland Kg 9.300 1,633.00 15,186.90
Pasir pasang M3 0.018 222,812.50 4,010.63
Semen warna Kg 2.750 6,900.00 18,975.00
JUMLAH HARGA BAHAN 99,122.53
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.900 80,000.00 72,000.00
Tukang batu L.02 OH 0.450 110,000.00 49,500.00
Kepala tukang L.03 OH 0.045 120,000.00 5,400.00
Mandor L.04 OH 0.045 120,000.00 5,400.00
JUMLAH TENAGA KERJA 132,300.00
B BAHAN
Keramik artistik buah 26.500 2,300.00 60,950.00
Semen Portland Kg 9.300 1,633.00 15,186.90
Pasir pasang M3 0.018 222,812.50 4,010.63
Semen warna Kg 1.940 6,900.00 13,386.00
JUMLAH HARGA BAHAN 93,533.53
C PERALATAN
III - 132
A.4.4.3.55. Pemasangan 1 m2 dinding marmer 100 cm x 100 cm
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.300 80,000.00 104,000.00
Tukang batu L.02 OH 0.650 110,000.00 71,500.00
Kepala tukang L.03 OH 0.065 120,000.00 7,800.00
Mandor L.04 OH 0.065 120,000.00 7,800.00
JUMLAH TENAGA KERJA 191,100.00
B BAHAN
Marmer buah 1.060 920,000.00 975,200.00
Semen Portland Kg 12.440 1,633.00 20,314.52
Pasir pasang M3 0.025 222,812.50 5,570.31
Semen warna Kg 0.650 6,900.00 4,485.00
Paku 12 cm buah 3.030 460.00 1,393.80
JUMLAH HARGA BAHAN 1,006,963.63
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.000 80,000.00 80,000.00
Tukang batu L.02 OH 0.500 110,000.00 55,000.00
Kepala tukang L.03 OH 0.050 120,000.00 6,000.00
Mandor L.04 OH 0.050 120,000.00 6,000.00
JUMLAH TENAGA KERJA 147,000.00
B BAHAN
Bata pelapis buah 63.000 4,715.00 297,045.00
Semen Portland Kg 12.440 1,633.00 20,314.52
Pasir pasang M3 0.025 222,812.50 5,570.31
Semen warna Kg 2.750 6,900.00 18,975.00
JUMLAH HARGA BAHAN 341,904.83
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.700 80,000.00 56,000.00
Tukang batu L.02 OH 0.350 110,000.00 38,500.00
Kepala tukang L.03 OH 0.035 120,000.00 4,200.00
Mandor L.04 OH 0.035 120,000.00 4,200.00
JUMLAH TENAGA KERJA 102,900.00
B BAHAN
Batu paras buah 1.100 4,830.00 5,313.00
Semen Portland Kg 11.750 1,633.00 19,187.75
Pasir pasang M3 0.035 222,812.50 7,798.44
JUMLAH HARGA BAHAN 32,299.19
C PERALATAN
III - 133
A.4.4.3.58. Pemasangan 1 m2 dinding batu tempel hitam
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.700 80,000.00 56,000.00
Tukang batu L.02 OH 0.350 110,000.00 38,500.00
Kepala tukang L.03 OH 0.035 120,000.00 4,200.00
Mandor L.04 OH 0.035 120,000.00 4,200.00
JUMLAH TENAGA KERJA 102,900.00
B BAHAN
Batu tempel hitam Buah 1.100 1,782.50 1,960.75
Semen Portland Kg 11.750 1,633.00 19,187.75
Pasir pasang M3 0.035 222,812.50 7,798.44
JUMLAH HARGA BAHAN 28,946.94
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.150 80,000.00 12,000.00
Tukang batu L.02 OH 0.150 110,000.00 16,500.00
Kepala tukang L.03 OH 0.015 120,000.00 1,800.00
Mandor L.04 OH 0.008 120,000.00 960.00
JUMLAH TENAGA KERJA 31,260.00
B BAHAN
Vynil buah 11.870 12,650.00 150,155.50
Lem Kg 0.350 25,300.00 8,855.00
JUMLAH HARGA BAHAN 159,010.50
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.350 80,000.00 28,000.00
Tukang batu L.02 OH 0.175 110,000.00 19,250.00
Kepala tukang L.03 OH 0.017 120,000.00 2,040.00
Mandor L.04 OH 0.002 120,000.00 240.00
JUMLAH TENAGA KERJA 49,530.00
B BAHAN
Wallpaper m 2.200 80,500.00 177,100.00
Lem Kg 0.250 25,300.00 6,325.00
JUMLAH HARGA BAHAN 183,425.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
III - 134
A TENAGA
Pekerja L.01 OH 0.120 80,000.00 9,600.00
Tukang batu L.02 OH 0.120 110,000.00 13,200.00
Kepala tukang L.03 OH 0.012 120,000.00 1,440.00
Mandor L.04 OH 0.006 120,000.00 720.00
JUMLAH TENAGA KERJA 24,960.00
III - 135
B BAHAN
Floor harderner Kg 5.000 11,155.00 55,775.00
JUMLAH HARGA BAHAN 55,775.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.080 80,000.00 6,400.00
Tukang batu L.02 OH 0.080 110,000.00 8,800.00
Kepala tukang L.03 OH 0.008 120,000.00 960.00
Mandor L.04 OH 0.004 120,000.00 480.00
JUMLAH TENAGA KERJA 16,640.00
B BAHAN
Vynil buah 1.760 12,650.00 22,264.00
Lem Kg 0.080 25,300.00 2,024.00
JUMLAH HARGA BAHAN 24,288.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.120 80,000.00 9,600.00
Tukang batu L.02 OH 0.120 110,000.00 13,200.00
Kepala tukang L.03 OH 0.012 120,000.00 1,440.00
Mandor L.04 OH 0.006 120,000.00 720.00
JUMLAH TENAGA KERJA 24,960.00
B BAHAN
Papan kayu kelas 1 M3 0.003 10,925,000.00 32,775.00
Paku/skrup 5 cm Kg 0.050 23,000.00 1,150.00
JUMLAH HARGA BAHAN 33,925.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.250 80,000.00 20,000.00
Tukang batu L.02 OH 0.500 110,000.00 55,000.00
Kepala tukang L.03 OH 0.050 120,000.00 6,000.00
Mandor L.04 OH 0.001 120,000.00 156.00
JUMLAH TENAGA KERJA 81,156.00
B BAHAN
Paving block 6 cm M2 1.010 57,500.00 58,075.00
Pasir beton M3 0.050 244,375.00 12,218.75
JUMLAH HARGA BAHAN 70,293.75
C PERALATAN
III - 136
Peralatan % 0.100 70,293.75 7,029.38
JUMLAH HARGA ALAT 7,029.38
III - 137
A.4.4.3.65. Pemasangan 1 m2 paving block natural tebal 8 cm
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.500 80,000.00 40,000.00
Tukang batu L.02 OH 0.500 110,000.00 55,000.00
Kepala tukang L.03 OH 0.050 120,000.00 6,000.00
Mandor L.04 OH 0.001 120,000.00 156.00
JUMLAH TENAGA KERJA 101,156.00
B BAHAN
Paving block 8 cm natural M2 1.010 71,300.00 72,013.00
Pasir beton M3 2.070 244,375.00 505,856.25
JUMLAH HARGA BAHAN 577,869.25
C PERALATAN
Peralatan % 0.100 577,869.25 57,786.93
JUMLAH HARGA ALAT 57,786.93
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.250 80,000.00 20,000.00
Tukang batu L.02 OH 0.500 110,000.00 55,000.00
Kepala tukang L.03 OH 0.050 120,000.00 6,000.00
Mandor L.04 OH 0.001 120,000.00 156.00
JUMLAH TENAGA KERJA 81,156.00
B BAHAN
Paving block 6cm berwarna M2 1.010 65,550.00 66,205.50
Pasir beton M3 0.050 244,375.00 12,218.75
JUMLAH HARGA BAHAN 78,424.25
C PERALATAN
Peralatan % 0.100 78,424.25 7,842.43
JUMLAH HARGA ALAT 7,842.43
III - 138
Pekerja L.01 OH 0.030 80,000.00 2,400.00
Tukang kayu L.02 OH 0.070 110,000.00 7,700.00
Kepala tukang L.03 OH 0.007 120,000.00 840.00
Mandor L.04 OH 0.004 120,000.00 480.00
JUMLAH TENAGA KERJA 11,420.00
III - 139
B BAHAN
Asbes semen m2 1.100 42,550.00 46,805.00
Paku tripleks kg 0.010 23,000.00 230.00
JUMLAH HARGA BAHAN 47,035.00
C PERALATAN
-
JUMLAH HARGA ALAT -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.120 80,000.00 9,600.00
Tukang kayu L.02 OH 0.120 110,000.00 13,200.00
Kepala tukang L.03 OH 0.012 120,000.00 1,440.00
Mandor L.04 OH 0.006 120,000.00 720.00
JUMLAH TENAGA KERJA 24,960.00
B BAHAN
Akustik Lembar 12.000 58,650.00 703,800.00
Paku tripleks kg 0.050 23,000.00 1,150.00
JUMLAH HARGA BAHAN 704,950.00
C PERALATAN
-
JUMLAH HARGA ALAT -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.120 80,000.00 9,600.00
Tukang kayu L.02 OH 0.120 110,000.00 13,200.00
Kepala tukang L.03 OH 0.012 120,000.00 1,440.00
Mandor L.04 OH 0.006 120,000.00 720.00
JUMLAH TENAGA KERJA 24,960.00
B BAHAN
Akustik Lembar 5.800 58,650.00 340,170.00
Paku tripleks kg 0.050 23,000.00 1,150.00
JUMLAH HARGA BAHAN 341,320.00
C PERALATAN
-
JUMLAH HARGA ALAT -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.100 80,000.00 8,000.00
Tukang kayu L.02 OH 0.100 110,000.00 11,000.00
Kepala tukang L.03 OH 0.010 120,000.00 1,200.00
Mandor L.04 OH 0.005 120,000.00 600.00
JUMLAH TENAGA KERJA 20,800.00
B BAHAN
Akustik Lembar 1.500 58,650.00 87,975.00
Paku tripleks kg 0.050 23,000.00 1,150.00
JUMLAH HARGA BAHAN 89,125.00
C PERALATAN
-
JUMLAH HARGA ALAT -
III - 140
D Jumlah (A+B+C) 109,925.00
E Overhead & Profit 15.00% 16,488.75
F Harga Satuan Pekerjaan (D+E) 126,413.75
III - 141
A.4.5.1.5. Pemasangan 1 m2 langit-langit tripleks ukuran (120 x 240) cm, tebal 3 mm, 4 mm & 6 mm
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.100 80,000.00 8,000.00
Tukang kayu L.02 OH 0.100 110,000.00 11,000.00
Kepala tukang L.03 OH 0.010 120,000.00 1,200.00
Mandor L.04 OH 0.005 120,000.00 600.00
JUMLAH TENAGA KERJA 20,800.00
B BAHAN
Tripleks Lembar 0.375 96,600.00 36,225.00
Paku tripleks kg 0.030 23,000.00 690.00
JUMLAH HARGA BAHAN 36,915.00
C PERALATAN
-
JUMLAH HARGA ALAT -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.800 80,000.00 64,000.00
Tukang kayu L.02 OH 0.800 110,000.00 88,000.00
Kepala tukang L.03 OH 0.080 120,000.00 9,600.00
Mandor L.04 OH 0.040 120,000.00 4,800.00
JUMLAH TENAGA KERJA 166,400.00
B BAHAN
Kayu papan m3 0.015 4,025,000.00 60,375.00
Paku tripleks kg 0.010 23,000.00 230.00
JUMLAH HARGA BAHAN 60,605.00
C PERALATAN
-
JUMLAH HARGA ALAT -
A.4.5.1.8. Pemasangan 1 m2 langit-langit akustik ukuran (60 x 120) cm berikut rangka alluminium
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
III - 142
A TENAGA
Pekerja L.01 OH 0.500 80,000.00 40,000.00
Tukang besi L.02 OH 0.500 110,000.00 55,000.00
Kepala tukang L.03 OH 0.050 120,000.00 6,000.00
Mandor L.04 OH 0.025 120,000.00 3,000.00
JUMLAH TENAGA KERJA 104,000.00
III - 143
B BAHAN
Profil Allum "T" m 3.600 113,850.00 409,860.00
Kawat Ø 4 mm kg 0.150 40,250.00 6,037.50
Ramset Buah 1.050 230.00 241.50
Akustik 60 x 120 Lembar 1.500 58,650.00 87,975.00
JUMLAH HARGA BAHAN 504,114.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.050 80,000.00 4,000.00
Tukang kayu L.02 OH 0.050 110,000.00 5,500.00
Kepala tukang L.03 OH 0.005 120,000.00 600.00
Mandor L.04 OH 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 10,460.00
B BAHAN
List kayu profil m 1.05 5,520.00 5,796.00
Paku kg 0.010 23,000.00 230.00
JUMLAH HARGA BAHAN 6,026.00
C PERALATAN
-
JUMLAH HARGA ALAT -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.150 80,000.00 12,000.00
Tukang kayu L.03 OH 0.075 110,000.00 8,250.00
Kepala tukang L.11 OH 0.008 120,000.00 900.00
Mandor L.15 OH 0.008 120,000.00 960.00
JUMLAH TENAGA KERJA 22,110.00
B BAHAN
Genteng palentong buah 25.000 1,035.00 25,875.00
JUMLAH HARGA BAHAN 25,875.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.150 80,000.00 12,000.00
Tukang kayu L.03 OH 0.075 110,000.00 8,250.00
Kepala tukang L.11 OH 0.008 120,000.00 960.00
Mandor L.15 OH 0.008 120,000.00 960.00
JUMLAH TENAGA KERJA 22,170.00
B BAHAN
Genteng kodok buah 25.000 1,610.00 40,250.00
JUMLAH HARGA BAHAN 40,250.00
III - 144
C PERALATAN
III - 145
A.4.5.2.3. Pemasangan 1 m2 atap genteng palentong besar/super
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.150 80,000.00 12,000.00
Tukang kayu L.03 OH 0.075 110,000.00 8,250.00
Kepala tukang L.11 OH 0.008 120,000.00 960.00
Mandor L.15 OH 0.008 120,000.00 960.00
JUMLAH TENAGA KERJA 22,170.00
B BAHAN
Genteng palentong buah 12.000 1,725.00 20,700.00
JUMLAH HARGA BAHAN 20,700.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.400 80,000.00 32,000.00
Tukang kayu L.03 OH 0.200 110,000.00 22,000.00
Kepala tukang L.11 OH 0.020 120,000.00 2,400.00
Mandor L.15 OH 0.002 120,000.00 240.00
JUMLAH TENAGA KERJA 56,640.00
B BAHAN
Genteng bubung Buah 5.000 2,300.00 11,500.00
Semen Portland Kg 8.000 1,633.00 13,064.00
Pasir pasang M3 0.032 222,812.50 7,130.00
JUMLAH HARGA BAHAN 31,694.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.400 80,000.00 32,000.00
Tukang kayu L.03 OH 0.200 110,000.00 22,000.00
Kepala tukang L.11 OH 0.020 120,000.00 2,400.00
Mandor L.15 OH 0.002 120,000.00 240.00
JUMLAH TENAGA KERJA 56,640.00
B BAHAN
Genteng bubung buah 5.000 4,600.00 23,000.00
Semen Portland Kg 8.000 1,633.00 13,064.00
Pasir pasang M3 0.032 222,812.50 7,130.00
JUMLAH HARGA BAHAN 43,194.00
C PERALATAN
III - 146
A.4.5.2.6. Pemasangan 1 m’ bubung genteng palentong besar
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.400 80,000.00 32,000.00
Tukang kayu L.03 OH 0.200 110,000.00 22,000.00
Kepala tukang L.11 OH 0.020 120,000.00 2,400.00
Mandor L.15 OH 0.002 120,000.00 240.00
JUMLAH TENAGA KERJA 56,640.00
B BAHAN
Genteng bubung buah 4.000 6,900.00 27,600.00
Semen Portland Kg 8.000 1,633.00 13,064.00
Pasir pasang M3 0.032 222,812.50 7,130.00
JUMLAH HARGA BAHAN 47,794.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.140 80,000.00 11,200.00
Tukang kayu L.03 OH 0.067 110,000.00 7,370.00
Kepala tukang L.11 OH 0.007 120,000.00 840.00
Mandor L.15 OH 0.007 120,000.00 840.00
JUMLAH TENAGA KERJA 20,250.00
B BAHAN
Rooflight 90 x 180 Lbr 0.600 71,300.00 42,780.00
Paku biasa ½”-1” Kg 0.050 23,000.00 1,150.00
JUMLAH HARGA BAHAN 43,930.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.140 80,000.00 11,200.00
Tukang kayu L.03 OH 0.075 110,000.00 8,250.00
Kepala tukang L.11 OH 0.008 120,000.00 960.00
Mandor L.15 OH 0.008 120,000.00 960.00
JUMLAH TENAGA KERJA 21,370.00
B BAHAN
Asbes gel 92 x 250 Lbr 0.500 36,800.00 18,400.00
Paku pancing 6 x 23 Kg 0.120 23,000.00 2,760.00
JUMLAH HARGA BAHAN 21,160.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
III - 147
Pekerja L.01 OH 0.140 80,000.00 11,200.00
Tukang kayu L.03 OH 0.075 110,000.00 8,250.00
Kepala tukang L.11 OH 0.008 120,000.00 960.00
Mandor L.15 OH 0.008 120,000.00 960.00
JUMLAH TENAGA KERJA 21,370.00
III - 148
B BAHAN
Asbes gel 92 x 250 Lbr 0.600 36,800.00 22,080.00
Paku pancing 6 x 23 Kg 0.120 23,000.00 2,760.00
JUMLAH HARGA BAHAN 24,840.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.140 80,000.00 11,200.00
Tukang kayu L.03 OH 0.070 110,000.00 7,700.00
Kepala tukang L.11 OH 0.007 120,000.00 840.00
Mandor L.15 OH 0.007 120,000.00 840.00
JUMLAH TENAGA KERJA 20,580.00
B BAHAN
Asbes gel 92 x 250 Lbr 0.600 36,800.00 22,080.00
Paku pancing 6 x 23 Kg 0.120 23,000.00 2,760.00
JUMLAH HARGA BAHAN 24,840.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.140 80,000.00 11,200.00
Tukang kayu L.03 OH 0.070 110,000.00 7,700.00
Kepala tukang L.11 OH 0.007 120,000.00 840.00
Mandor L.15 OH 0.007 120,000.00 840.00
JUMLAH TENAGA KERJA 20,580.00
B BAHAN
Asbes gel 92 x 250 Lbr 0.750 36,800.00 27,600.00
Paku pancing 6 x 23 Kg 0.120 23,000.00 2,760.00
JUMLAH HARGA BAHAN 30,360.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.140 80,000.00 11,200.00
Tukang kayu L.03 OH 0.070 110,000.00 7,700.00
Kepala tukang L.11 OH 0.007 120,000.00 840.00
Mandor L.15 OH 0.007 120,000.00 840.00
JUMLAH TENAGA KERJA 20,580.00
B BAHAN
Asbes gel 92 x 250 Lbr 0.350 36,800.00 12,880.00
Paku pancing 6 x 23 Kg 0.120 23,000.00 2,760.00
JUMLAH HARGA BAHAN 15,640.00
C PERALATAN
III - 149
JUMLAH HARGA ALAT -
III - 150
A.4.5.2.13. Pemasangan 1 m2 atap asbes gelombang 1,05 m x 2,70 m x 4 mm
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.140 80,000.00 11,200.00
Tukang kayu L.03 OH 0.070 110,000.00 7,700.00
Kepala tukang L.11 OH 0.007 120,000.00 840.00
Mandor L.15 OH 0.007 120,000.00 840.00
JUMLAH TENAGA KERJA 20,580.00
B BAHAN
Asbes gel 92 x 250 Lbr 0.440 36,800.00 16,192.00
Paku pancing 6 x 23 Kg 0.120 23,000.00 2,760.00
JUMLAH HARGA BAHAN 18,952.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.140 80,000.00 11,200.00
Tukang kayu L.03 OH 0.070 110,000.00 7,700.00
Kepala tukang L.11 OH 0.007 120,000.00 840.00
Mandor L.15 OH 0.007 120,000.00 840.00
JUMLAH TENAGA KERJA 20,580.00
B BAHAN
Asbes gel 92 x 250 Lbr 0.510 36,800.00 18,768.00
Paku pancing 6 x 23 Kg 0.120 23,000.00 2,760.00
JUMLAH HARGA BAHAN 21,528.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.140 80,000.00 11,200.00
III - 151
Tukang kayu L.03 OH 0.070 110,000.00 7,700.00
Kepala tukang L.11 OH 0.007 120,000.00 840.00
Mandor L.15 OH 0.007 120,000.00 840.00
JUMLAH TENAGA KERJA 20,580.00
III - 152
B BAHAN
Asbes gel 92 x 250 Lbr 0.800 36,800.00 29,440.00
Paku pancing 6 x 23 Kg 0.120 23,000.00 2,760.00
JUMLAH HARGA BAHAN 32,200.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.140 80,000.00 11,200.00
Tukang kayu L.03 OH 0.070 110,000.00 7,700.00
Kepala tukang L.11 OH 0.007 120,000.00 840.00
Mandor L.15 OH 0.007 120,000.00 840.00
JUMLAH TENAGA KERJA 20,580.00
B BAHAN
Asbes gel 92 x 250 Lbr 0.370 36,800.00 13,616.00
Paku pancing 6 x 23 Kg 0.120 23,000.00 2,760.00
JUMLAH HARGA BAHAN 16,376.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.140 80,000.00 11,200.00
Tukang kayu L.03 OH 0.070 110,000.00 7,700.00
Kepala tukang L.11 OH 0.007 120,000.00 840.00
Mandor L.15 OH 0.007 120,000.00 840.00
JUMLAH TENAGA KERJA 20,580.00
B BAHAN
Asbes gel 92 x 250 Lbr 0.380 36,800.00 13,984.00
Paku pancing 6 x 23 Kg 0.120 23,000.00 2,760.00
JUMLAH HARGA BAHAN 16,744.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.140 80,000.00 11,200.00
Tukang kayu L.03 OH 0.070 110,000.00 7,700.00
Kepala tukang L.11 OH 0.007 120,000.00 840.00
Mandor L.15 OH 0.007 120,000.00 840.00
JUMLAH TENAGA KERJA 20,580.00
B BAHAN
Asbes gel 92 x 250 Lbr 0.460 36,800.00 16,928.00
Paku pancing 6 x 23 Kg 0.120 23,000.00 2,760.00
JUMLAH HARGA BAHAN 19,688.00
C PERALATAN
III - 153
JUMLAH HARGA ALAT -
III - 154
A.4.5.2.20. Pemasangan 1 m2 atap asbes gelombang 1,08 m x 2,10 m x 6 mm
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.140 80,000.00 11,200.00
Tukang kayu L.03 OH 0.070 110,000.00 7,700.00
Kepala tukang L.11 OH 0.007 120,000.00 840.00
Mandor L.15 OH 0.007 120,000.00 840.00
JUMLAH TENAGA KERJA 20,580.00
B BAHAN
Asbes gel 92 x 250 Lbr 0.490 36,800.00 18,032.00
Paku pancing 6 x 23 Kg 0.120 23,000.00 2,760.00
JUMLAH HARGA BAHAN 20,792.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.140 80,000.00 11,200.00
Tukang kayu L.03 OH 0.070 110,000.00 7,700.00
Kepala tukang L.11 OH 0.007 120,000.00 840.00
Mandor L.15 OH 0.007 120,000.00 840.00
JUMLAH TENAGA KERJA 20,580.00
B BAHAN
Asbes gel 92 x 250 Lbr 0.570 36,800.00 20,976.00
Paku pancing 6 x 23 Kg 0.120 23,000.00 2,760.00
JUMLAH HARGA BAHAN 23,736.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.084 80,000.00 6,720.00
Tukang kayu L.03 OH 0.125 110,000.00 13,750.00
Kepala tukang L.11 OH 0.013 120,000.00 1,560.00
Mandor L.15 OH 0.004 120,000.00 480.00
JUMLAH TENAGA KERJA 22,510.00
B BAHAN
Bubung stel gel. Lbr 2.400 71,300.00 171,120.00
Paku skrup 3,5” buah 6.000 460.00 2,760.00
JUMLAH HARGA BAHAN 173,880.00
C PERALATAN
III - 155
A.4.5.2.23. Pemasangan 1 m’ bubung stel gelombang 1,05 m
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.084 80,000.00 6,720.00
Tukang kayu L.03 OH 0.125 110,000.00 13,750.00
Kepala tukang L.11 OH 0.013 120,000.00 1,560.00
Mandor L.15 OH 0.004 120,000.00 480.00
JUMLAH TENAGA KERJA 22,510.00
B BAHAN
Bubung stel gel. Lbr 2.100 71,300.00 149,730.00
Paku skrup 3,5” buah 6.000 460.00 2,760.00
JUMLAH HARGA BAHAN 152,490.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.084 80,000.00 6,720.00
Tukang kayu L.03 OH 0.125 110,000.00 13,750.00
Kepala tukang L.11 OH 0.013 120,000.00 1,560.00
Mandor L.15 OH 0.004 120,000.00 480.00
JUMLAH TENAGA KERJA 22,510.00
B BAHAN
Bubung stel gel. Lbr 2.050 71,300.00 146,165.00
Paku skrup 3,5” buah 6.000 460.00 2,760.00
JUMLAH HARGA BAHAN 148,925.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.084 80,000.00 6,720.00
Tukang kayu L.03 OH 0.125 110,000.00 13,750.00
Kepala tukang L.11 OH 0.013 120,000.00 1,560.00
Mandor L.15 OH 0.004 120,000.00 480.00
JUMLAH TENAGA KERJA 22,510.00
B BAHAN
Nok paten 92 cm Lbr 1.200 71,300.00 85,560.00
Paku skrup 3,5” buah 6.000 460.00 2,760.00
JUMLAH HARGA BAHAN 88,320.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.084 80,000.00 6,720.00
III - 156
Tukang kayu L.03 OH 0.125 110,000.00 13,750.00
Kepala tukang L.11 OH 0.013 120,000.00 1,560.00
Mandor L.15 OH 0.004 120,000.00 480.00
JUMLAH TENAGA KERJA 22,510.00
III - 157
B BAHAN
Nok paten 92 cm Lbr 1.200 71,300.00 85,560.00
Paku skrup 3,5” buah 6.000 460.00 2,760.00
JUMLAH HARGA BAHAN 88,320.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.084 80,000.00 6,720.00
Tukang kayu L.03 OH 0.125 110,000.00 13,750.00
Kepala tukang L.11 OH 0.013 120,000.00 1,560.00
Mandor L.15 OH 0.004 120,000.00 480.00
JUMLAH TENAGA KERJA 22,510.00
B BAHAN
Nok paten 92 cm Lbr 1.200 71,300.00 85,560.00
Paku skrup 3,5” buah 6.000 460.00 2,760.00
JUMLAH HARGA BAHAN 88,320.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.100 80,000.00 8,000.00
Tukang kayu L.03 OH 0.150 110,000.00 16,500.00
Kepala tukang L.11 OH 0.013 120,000.00 1,560.00
Mandor L.15 OH 0.004 120,000.00 480.00
JUMLAH TENAGA KERJA 26,540.00
B BAHAN
Nok paten 92 cm Lbr 1.100 71,300.00 78,430.00
Paku skrup 3,5” buah 6.000 460.00 2,760.00
JUMLAH HARGA BAHAN 81,190.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.084 80,000.00 6,720.00
Tukang kayu L.03 OH 0.125 110,000.00 13,750.00
Kepala tukang L.11 OH 0.013 120,000.00 1,560.00
Mandor L.15 OH 0.004 120,000.00 480.00
JUMLAH TENAGA KERJA 22,510.00
B BAHAN
Nok paten 92 cm Lbr 1.100 71,300.00 78,430.00
Paku skrup 3,5” buah 6.000 460.00 2,760.00
JUMLAH HARGA BAHAN 81,190.00
C PERALATAN
III - 158
D Jumlah (A+B+C) 103,700.00
E Overhead & Profit 15.00% 15,555.00
F Harga Satuan Pekerjaan (D+E) 119,255.00
III - 159
A.4.5.2.30. Pemasangan 1 m2 genteng beton
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.200 80,000.00 16,000.00
Tukang kayu L.03 OH 0.100 110,000.00 11,000.00
Kepala tukang L.11 OH 0.010 120,000.00 1,200.00
Mandor L.15 OH 0.010 120,000.00 1,200.00
JUMLAH TENAGA KERJA 29,400.00
B BAHAN
Genteng beton buah 11.000 5,750.00 63,250.00
Paku biasa 2”-5” Kg 0.030 23,000.00 690.00
JUMLAH HARGA BAHAN 63,940.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.200 80,000.00 16,000.00
Tukang kayu L.03 OH 0.100 110,000.00 11,000.00
Kepala tukang L.11 OH 0.010 120,000.00 1,200.00
Mandor L.15 OH 0.001 120,000.00 120.00
JUMLAH TENAGA KERJA 28,320.00
B BAHAN
Genteng metal buah 1.300 55,200.00 71,760.00
Paku biasa ½”-1” Kg 0.200 23,000.00 4,600.00
JUMLAH HARGA BAHAN 76,360.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.200 80,000.00 16,000.00
Tukang kayu L.03 OH 0.100 110,000.00 11,000.00
Kepala tukang L.11 OH 0.010 120,000.00 1,200.00
Mandor L.15 OH 0.001 120,000.00 120.00
JUMLAH TENAGA KERJA 28,320.00
B BAHAN
Genteng metal buah 2.000 55,200.00 110,400.00
Paku biasa ½”-1” Kg 0.200 23,000.00 4,600.00
JUMLAH HARGA BAHAN 115,000.00
C PERALATAN
III - 160
A.4.5.2.34. Pemasangan 1 m2 atap sirap kayu
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.166 80,000.00 13,280.00
Tukang kayu L.03 OH 0.250 110,000.00 27,500.00
Kepala tukang L.11 OH 0.025 120,000.00 3,000.00
Mandor L.15 OH 0.008 120,000.00 960.00
JUMLAH TENAGA KERJA 44,740.00
B BAHAN
Sirap kayu buah 30.000 1,897.50 56,925.00
Paku biasa ½”-1” Kg 0.200 23,000.00 4,600.00
JUMLAH HARGA BAHAN 61,525.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.400 80,000.00 32,000.00
Tukang kayu L.03 OH 0.200 110,000.00 22,000.00
Kepala tukang L.11 OH 0.020 120,000.00 2,400.00
Mandor L.15 OH 0.020 120,000.00 2,400.00
JUMLAH TENAGA KERJA 58,800.00
B BAHAN
Nok genteng beton buah 3.500 4,600.00 16,100.00
Paku biasa ½”-1” Kg 0.050 23,000.00 1,150.00
Semen PC Kg 10.800 1,633.00 17,636.40
Pasir pasang M3 0.032 222,812.50 7,130.00
Semen warna Kg 1.000 6,900.00 6,900.00
JUMLAH HARGA BAHAN 48,916.40
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.250 80,000.00 20,000.00
Tukang kayu L.03 OH 0.150 110,000.00 16,500.00
Kepala tukang L.11 OH 0.015 120,000.00 1,800.00
Mandor L.15 OH 0.013 120,000.00 1,560.00
JUMLAH TENAGA KERJA 39,860.00
B BAHAN
Nok genteng metal buah 1.100 51,060.00 56,166.00
Paku biasa ½”-1” Kg 0.050 23,000.00 1,150.00
JUMLAH HARGA BAHAN 57,316.00
C PERALATAN
III - 161
A.4.5.2.38. Pemasangan 1 m’ nok sirap
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.125 80,000.00 10,000.00
Tukang kayu L.03 OH 0.250 110,000.00 27,500.00
Kepala tukang L.11 OH 0.025 120,000.00 3,000.00
Mandor L.15 OH 0.006 120,000.00 720.00
JUMLAH TENAGA KERJA 41,220.00
B BAHAN
Seng pelat 3" x 6” Lbr 0.400 92,000.00 36,800.00
Paku biasa ½”-1” Kg 0.050 23,000.00 1,150.00
Paku biasa 2”-5” Kg 0.050 23,000.00 1,150.00
JUMLAH HARGA BAHAN 39,100.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.120 80,000.00 9,600.00
Tukang kayu L.03 OH 0.060 110,000.00 6,600.00
Kepala tukang L.11 OH 0.006 120,000.00 720.00
Mandor L.15 OH 0.006 120,000.00 720.00
JUMLAH TENAGA KERJA 17,640.00
B BAHAN
Seng gel 3”x6” Lbr 0.700 92,000.00 64,400.00
Paku biasa ½”-1” Kg 0.020 23,000.00 460.00
JUMLAH HARGA BAHAN 64,860.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.150 80,000.00 12,000.00
Tukang kayu L.03 OH 0.070 110,000.00 7,700.00
Kepala tukang L.11 OH 0.007 120,000.00 840.00
Mandor L.15 OH 0.006 120,000.00 720.00
JUMLAH TENAGA KERJA 21,260.00
B BAHAN
Seng pelat 3”x6” bjls 28 Lbr 0.300 92,000.00 27,600.00
Paku biasa ½”-1” Kg 0.040 23,000.00 920.00
JUMLAH HARGA BAHAN 28,520.00
C PERALATAN
III - 162
A.4.5.2.41. Pemasangan 1 m2 atap alumunium
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.150 80,000.00 12,000.00
Tukang kayu L.03 OH 0.750 110,000.00 82,500.00
Kepala tukang L.11 OH 0.080 120,000.00 9,600.00
Mandor L.15 OH 0.006 120,000.00 720.00
JUMLAH TENAGA KERJA 104,820.00
B BAHAN
Aluminium gel tebal 0,55 Lbr 1.050 156,400.00 164,220.00
Paku hak panjang 15 cm Kg 0.020 23,000.00 460.00
JUMLAH HARGA BAHAN 164,680.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.150 80,000.00 12,000.00
Tukang kayu L.03 OH 0.050 110,000.00 5,500.00
Kepala tukang L.11 OH 0.005 120,000.00 600.00
Mandor L.15 OH 0.008 120,000.00 960.00
JUMLAH TENAGA KERJA 19,060.00
B BAHAN
Aluminium foil M2 1.050 10,350.00 10,867.50
JUMLAH HARGA BAHAN 10,867.50
C PERALATAN
A.4.6.1.1. Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas I
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 7.000 80,000.00 560,000.00
Tukang kayu L.03 OH 21.000 110,000.00 2,310,000.00
Kepala tukang L.03 OH 2.100 120,000.00 252,000.00
Mandor L.04 OH 0.350 120,000.00 42,000.00
JUMLAH TENAGA KERJA 3,164,000.00
B BAHAN
Balok kayu m3 1.100 10,925,000.00 12,017,500.00
Paku 10 cm Kg 1.250 23,000.00 28,750.00
Lem kayu Kg 1.000 34,500.00 34,500.00
JUMLAH HARGA BAHAN 12,080,750.00
C PERALATAN
JUMLAH HARGA ALAT -
III - 163
A.4.6.1.2. Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas II atau III
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 6.000 80,000.00 480,000.00
Tukang kayu L.03 OH 18.000 110,000.00 1,980,000.00
Kepala tukang L.03 OH 1.800 120,000.00 216,000.00
Mandor L.04 OH 0.300 120,000.00 36,000.00
JUMLAH TENAGA KERJA 2,712,000.00
B BAHAN
Balok kayu m3 1.200 4,025,000.00 4,830,000.00
Paku 10 cm Kg 1.250 23,000.00 28,750.00
Lem kayu Kg 1.000 34,500.00 34,500.00
JUMLAH HARGA BAHAN 4,893,250.00
C PERALATAN
JUMLAH HARGA ALAT -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.350 80,000.00 28,000.00
Tukang kayu L.03 OH 1.050 110,000.00 115,500.00
Kepala tukang L.03 OH 0.105 120,000.00 12,600.00
Mandor L.04 OH 0.018 120,000.00 2,160.00
JUMLAH TENAGA KERJA 158,260.00
B BAHAN
Papan kayu m3 0.040 5,750,000.00 230,000.00
Paku 5 – 7 cm Kg 0.050 23,000.00 1,150.00
JUMLAH HARGA BAHAN 231,150.00
C PERALATAN
A.4.6.1.4. Pembuatan dan pemasangan 1 m2 pintu klamp sederhana, kayu kelas III
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.350 80,000.00 28,000.00
Tukang kayu L.03 OH 1.050 110,000.00 115,500.00
Kepala tukang L.03 OH 0.105 120,000.00 12,600.00
Mandor L.04 OH 0.018 120,000.00 2,160.00
JUMLAH TENAGA KERJA 158,260.00
B BAHAN
Papan kayu m3 0.040 4,025,000.00 161,000.00
Paku 5 – 7 cm Kg 0.050 23,000.00 1,150.00
JUMLAH HARGA BAHAN 162,150.00
C PERALATAN
III - 164
A.4.6.1.5. Pembuatan dan pemasangan 1 m2 daun pintu panel, kayu kelas I atau II
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.000 80,000.00 80,000.00
Tukang kayu L.03 OH 3.000 110,000.00 330,000.00
Kepala tukang L.03 OH 0.300 120,000.00 36,000.00
Mandor L.04 OH 0.050 120,000.00 6,000.00
JUMLAH TENAGA KERJA 452,000.00
B BAHAN
Papan kayu m3 0.040 5,750,000.00 230,000.00
Lem kayu Kg 0.500 34,500.00 17,250.00
JUMLAH HARGA BAHAN 247,250.00
C PERALATAN
A.4.6.1.6. Pembuatan dan pemasangan 1 m2 pintu dan jendela kaca, kayu kelas I atau II
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.800 80,000.00 64,000.00
Tukang kayu L.03 OH 2.400 110,000.00 264,000.00
Kepala tukang L.03 OH 0.240 120,000.00 28,800.00
Mandor L.04 OH 0.040 120,000.00 4,800.00
JUMLAH TENAGA KERJA 361,600.00
B BAHAN
Papan kayu m3 0.024 5,750,000.00 138,000.00
Lem kayu Kg 0.300 34,500.00 10,350.00
JUMLAH HARGA BAHAN 148,350.00
C PERALATAN
A.4.6.1.7. Pembuatan dan pemasangan 1 m2 pintu dan jendela jalusi kayu kelas I atau II
A.4.6.1.8. Pembuatan 1 m2 daun pintu plywood rangkap, rangka kayu kelas II tertutup (lebar sampai 90 cm)
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
III - 165
Pekerja L.01 OH 0.700 80,000.00 56,000.00
Tukang kayu L.03 OH 2.100 110,000.00 231,000.00
Kepala tukang L.03 OH 0.210 120,000.00 25,200.00
Mandor L.04 OH 0.035 120,000.00 4,200.00
JUMLAH TENAGA KERJA 316,400.00
III - 166
B BAHAN
Papan kayu m3 0.025 5,750,000.00 143,750.00
Paku 1 cm – 2,5 cm kg 0.030 23,000.00 690.00
Lem kayu kg 0.500 34,500.00 17,250.00
Plywood tebal 4 mm Lembar 1.000 106,087.50 106,087.50
Ukuran (90 x 220) cm
JUMLAH HARGA BAHAN 267,777.50
C PERALATAN
JUMLAH HARGA ALAT -
A.4.6.1.9. Pembuatan 1 m2 pintu plywood rangkap, rangka expose kayu kelas I atau II
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.80 80,000.00 64,000.00
Tukang kayu L.03 OH 2.40 110,000.00 264,000.00
Kepala tukang L.03 OH 0.24 120,000.00 28,800.00
Mandor L.04 OH 0.04 120,000.00 4,800.00
JUMLAH TENAGA KERJA 361,600.00
B BAHAN
Papan kayu m3 0.026 5,750,000.00 147,200.00
Paku 1 cm – 2,5 cm kg 0.030 23,000.00 690.00
Lem kayu kg 0.500 34,500.00 17,250.00
Plywood 4 mm Lembar 1.000 106,087.50 106,087.50
(90 x 220) cm
JUMLAH HARGA BAHAN 271,227.50
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.670 80,000.00 53,600.00
Tukang kayu L.03 OH 2.000 110,000.00 220,000.00
Kepala tukang L.03 OH 0.200 120,000.00 24,000.00
Mandor L.04 OH 0.335 120,000.00 40,200.00
JUMLAH TENAGA KERJA 337,800.00
B BAHAN
Papan kayu m3 0.060 5,750,000.00 345,000.00
Paku 1 – 2,5 cm kg 0.150 23,000.00 3,450.00
JUMLAH HARGA BAHAN 348,450.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.800 80,000.00 64,000.00
Tukang kayu L.03 OH 2.400 110,000.00 264,000.00
Kepala tukang L.03 OH 0.240 120,000.00 28,800.00
Mandor L.04 OH 0.040 120,000.00 4,800.00
JUMLAH TENAGA KERJA 361,600.00
III - 167
B BAHAN
Papan kayu m3 0.025 10,925,000.00 273,125.00
Paku 1 – 2,5 cm kg 0.030 23,000.00 690.00
Lem kayu kg 0.300 34,500.00 10,350.00
Teakwood 4 mm Lembar 1.000 74,750.00 74,750.00
90 x 220 cm
JUMLAH HARGA BAHAN 358,915.00
C PERALATAN
JUMLAH HARGA ALAT -
A.4.6.1.12. Pemasangan 1 m2 teakwood rangkap lapis formika, rangka expose kayu kelas II
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.850 80,000.00 68,000.00
Tukang kayu L.03 OH 2.550 110,000.00 280,500.00
Kepala tukang L.03 OH 0.255 120,000.00 30,600.00
Mandor L.04 OH 0.043 120,000.00 5,160.00
JUMLAH TENAGA KERJA 384,260.00
B BAHAN
Papan kayu m3 0.025 5,750,000.00 143,750.00
Paku 1 – 2,5 cm kg 0.030 23,000.00 690.00
Lem kayu kg 0.800 34,500.00 27,600.00
Teakwood 4 mm Lembar 1.000 74,750.00 74,750.00
90 x 220 cm
Formika Lembar 0.500 246,790.00
JUMLAH HARGA BAHAN
C PERALATAN -
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 631,050.00
E Overhead & Profit 15.00% 94,657.50
F Harga Satuan Pekerjaan (D+E) 725,707.50
A.4.6.1.13. Pemasangan 1 m3 konstruksi kuda-kuda konvensional, kayu kelas I, II dan III bentang 6 meter
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 4.000 80,000.00 320,000.00
Tukang kayu L.03 OH 12.000 110,000.00 1,320,000.00
Kepala tukang L.03 OH 1.200 120,000.00 144,000.00
Mandor L.04 OH 0.200 120,000.00 24,000.00
JUMLAH TENAGA KERJA 1,808,000.00
B BAHAN
Balok kayu m3 1.100 4,025,000.00 4,427,500.00
Besi strip tebal 5 mm kg 15.000 15,812.50 237,187.50
Paku 12 cm kg 5.600 23,000.00 128,800.00
JUMLAH HARGA BAHAN 4,793,487.50
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 6,601,487.50
E Overhead & Profit 15.00% 990,223.13
F Harga Satuan Pekerjaan (D+E) 7,591,710.63
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 6.700 80,000.00 536,000.00
Tukang kayu L.03 OH 20.100 110,000.00 2,211,000.00
Kepala tukang L.03 OH 2.010 120,000.00 241,200.00
Mandor L.04 OH 0.335 120,000.00 40,200.00
JUMLAH TENAGA KERJA 3,028,400.00
B BAHAN
Balok kayu m3 1.200 10,925,000.00 13,110,000.00
Besi strip tebal 5 mm kg 15.000 15,812.50 237,187.50
Paku 12 cm kg 5.600 23,000.00 128,800.00
III - 168
JUMLAH HARGA BAHAN 13,475,987.50
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 16,504,387.50
E Overhead & Profit 15.00% 2,475,658.13
F Harga Satuan Pekerjaan (D+E) 18,980,045.63
III - 169
A.4.6.1.15. Pemasangan 1 m3 konstruksi gordeng, kayu kelas II
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 6.700 80,000.00 536,000.00
Tukang kayu L.03 OH 20.100 110,000.00 2,211,000.00
Kepala tukang L.03 OH 2.010 120,000.00 241,200.00
Mandor L.04 OH 0.335 120,000.00 40,200.00
JUMLAH TENAGA KERJA 3,028,400.00
B BAHAN
Balok kayu m3 1.100 5,750,000.00 6,325,000.00
Besi strip tebal 5 mm kg 15.000 15,812.50 237,187.50
Paku 12 cm kg 3.000 23,000.00 69,000.00
JUMLAH HARGA BAHAN 6,631,187.50
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.100 80,000.00 8,000.00
Tukang kayu L.03 OH 0.100 110,000.00 11,000.00
Kepala tukang L.03 OH 0.010 120,000.00 1,200.00
Mandor L.04 OH 0.005 120,000.00 600.00
JUMLAH TENAGA KERJA 20,800.00
B BAHAN
Kaso-kaso 5 x 7cm m3 0.014 5,750,000.00 80,500.00
Reng 2 x 3 cm m3 0.036 40,250.00 1,449.00
Paku 5 dan 10 cm kg 0.250 23,000.00 5,750.00
JUMLAH HARGA BAHAN 87,699.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.100 80,000.00 8,000.00
Tukang kayu L.03 OH 0.100 110,000.00 11,000.00
Kepala tukang L.03 OH 0.010 120,000.00 1,200.00
Mandor L.04 OH 0.005 120,000.00 600.00
JUMLAH TENAGA KERJA 20,800.00
B BAHAN
Kaso-kaso 5 x 7cm m3 0.014 5,750,000.00 80,500.00
Reng (3 x 4) cm m3 0.057 40,250.00 2,294.25
Paku 5 dan 10 cm kg 0.250 23,000.00 5,750.00
JUMLAH HARGA BAHAN 88,544.25
C PERALATAN
III - 170
A.4.6.1.18. Pemasangan 1 m2 rangka atap sirap, kayu kelas II
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.120 80,000.00 9,600.00
Tukang kayu L.03 OH 0.120 110,000.00 13,200.00
Kepala tukang L.03 OH 0.012 120,000.00 1,440.00
Mandor L.04 OH 0.006 120,000.00 720.00
JUMLAH TENAGA KERJA 24,960.00
B BAHAN
Kayu kelas II m3 0.014 5,750,000.00 80,500.00
Paku 5 - 10 cm m3 0.057 23,000.00 1,311.00
JUMLAH HARGA BAHAN 81,811.00
C PERALATAN
A.4.6.1.19. Pemasangan 1 m2 rangka langit-langit (50 x 100) cm, kayu kelas II atau III
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.150 80,000.00 12,000.00
Tukang kayu L.03 OH 0.300 110,000.00 33,000.00
Kepala tukang L.03 OH 0.030 120,000.00 3,600.00
Mandor L.04 OH 0.075 120,000.00 9,000.00
JUMLAH TENAGA KERJA 57,600.00
B BAHAN
Kaso-kaso 5 x 7cm m3 0.015 5,750,000.00 88,550.00
Paku 7 cm – 10 cm kg 0.200 23,000.00 4,600.00
JUMLAH HARGA BAHAN 93,150.00
C PERALATAN
A.4.6.1.20. Pemasangan 1 m2 rangka langit-langit (60 x 60) cm, kayu kelas II atau III
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.200 80,000.00 16,000.00
Tukang kayu L.03 OH 0.300 110,000.00 33,000.00
Kepala tukang L.03 OH 0.030 120,000.00 3,600.00
Mandor L.04 OH 0.010 120,000.00 1,200.00
JUMLAH TENAGA KERJA 53,800.00
B BAHAN
Kaso-kaso 5 x 7 cm m3 0.016 5,750,000.00 93,725.00
Paku 7 – 10 cm kg 0.250 23,000.00 5,750.00
JUMLAH HARGA BAHAN 99,475.00
C PERALATAN
A.4.6.1.21. Pemasangan 1 m’ lisplank ukuran (3 x 20) cm, kayu kelas I atau kelas II
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.100 80,000.00 8,000.00
III - 171
Tukang kayu L.03 OH 0.200 110,000.00 22,000.00
Kepala tukang L.03 OH 0.020 120,000.00 2,400.00
Mandor L.04 OH 0.005 120,000.00 600.00
JUMLAH TENAGA KERJA 33,000.00
III - 172
B BAHAN
Papan kayu m3 0.011 5,750,000.00 62,100.00
Paku 5 dan 7 cm kg 0.100 23,000.00 2,300.00
JUMLAH HARGA BAHAN 64,400.00
C PERALATAN
A.4.6.1.22. Pemasangan 1 m’ lisplank ukuran (3 x 30) cm, kayu kelas I atau kelas II
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.100 80,000.00 8,000.00
Tukang kayu L.03 OH 0.200 110,000.00 22,000.00
Kepala tukang L.03 OH 0.020 120,000.00 2,400.00
Mandor L.04 OH 0.005 120,000.00 600.00
JUMLAH TENAGA KERJA 33,000.00
B BAHAN
Papan kayu m3 0.011 5,750,000.00 63,250.00
Paku 5 dan 7 cm kg 0.050 23,000.00 1,150.00
JUMLAH HARGA BAHAN 64,400.00
C PERALATAN
A.4.6.1.23. Pemasangan 1 m2 rangka dinding pemisah (60 x 120) cm kayu kelas II atau III
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.200 80,000.00 16,000.00
Tukang kayu L.03 OH 0.600 110,000.00 66,000.00
Kepala tukang L.03 OH 0.060 120,000.00 7,200.00
Mandor L.04 OH 0.010 120,000.00 1,200.00
JUMLAH TENAGA KERJA 90,400.00
B BAHAN
Balok kayu, 6 x 12 m3 0.028 5,750,000.00 161,000.00
Paku 5 dan 10 kg 0.150 23,000.00 3,450.00
Plywood 4 mm, Lembar 0.860 106,087.50 91,235.25
120 x 240
Lem kayu kg 0.560 34,500.00 19,320.00
III - 173
JUMLAH HARGA BAHAN 275,005.25
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 365,405.25
E Overhead & Profit 15.00% 54,810.79
F Harga Satuan Pekerjaan (D+E) 420,216.04
III - 174
A.4.6.1.26. Pemasangan 1 m2 dinding lambrisering dari papan kayu kelas I
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.600 80,000.00 48,000.00
Tukang kayu L.03 OH 1.800 110,000.00 198,000.00
Kepala tukang L.03 OH 0.180 120,000.00 21,600.00
Mandor L.04 OH 0.030 120,000.00 3,600.00
JUMLAH TENAGA KERJA 271,200.00
B BAHAN
Papan kayu m3 0.007 10,925,000.00 76,475.00
Paku 5 dan 10 kg 0.100 23,000.00 2,300.00
Paku skrup 10 cm kg 0.150 23,000.00 3,450.00
JUMLAH HARGA BAHAN 82,225.00
C PERALATAN
JUMLAH HARGA ALAT -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.025 80,000.00 2,000.00
Tukang kayu L.03 OH 0.075 110,000.00 8,250.00
Kepala tukang L.03 OH 0.008 120,000.00 960.00
Mandor L.04 OH 0.001 120,000.00 120.00
JUMLAH TENAGA KERJA 11,330.00
B BAHAN
Plywood 4 mm m3 0.400 106,087.50 42,435.00
Paku 1 dan 2,5 kg 0.050 23,000.00 1,150.00
JUMLAH HARGA BAHAN 43,585.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.060 80,000.00 4,800.00
Tukang kayu L.02 OH 0.600 110,000.00 66,000.00
Kepala tukang L.03 OH 0.060 120,000.00 7,200.00
Mandor L.04 OH 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 78,360.00
B BAHAN
Kunci tanam antik buah 1.000 255,300.00 255,300.00
JUMLAH HARGA BAHAN 255,300.00
C PERALATAN
III - 175
A.4.6.2.2. Pemasangan 1 buah kunci tanam biasa
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.005 80,000.00 400.00
Tukang kayu L.02 OH 0.500 110,000.00 55,000.00
Kepala tukang L.03 OH 0.050 120,000.00 6,000.00
Mandor L.04 OH 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 61,760.00
B BAHAN
Kunci tanam KM buah 1.000 51,750.00 51,750.00
JUMLAH HARGA BAHAN 51,750.00
C PERALATAN
JUMLAH HARGA ALAT -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.015 80,000.00 1,200.00
Tukang kayu L.02 OH 0.150 110,000.00 16,500.00
Kepala tukang L.03 OH 0.015 120,000.00 1,800.00
Mandor L.04 OH 0.001 120,000.00 96.00
JUMLAH TENAGA KERJA 19,596.00
B BAHAN
Engsel pintu buah 1.000 69,000.00 69,000.00
JUMLAH HARGA BAHAN 69,000.00
III - 176
C PERALATAN
JUMLAH HARGA ALAT -
III - 177
A.4.6.2.6. Pemasangan 1 buah engsel jendela kupu-kupu
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.100 80,000.00 8,000.00
Tukang kayu L.02 OH 0.200 110,000.00 22,000.00
Kepala tukang L.03 OH 0.020 120,000.00 2,400.00
Mandor L.04 OH 0.001 120,000.00 60.00
JUMLAH TENAGA KERJA 32,460.00
B BAHAN
Engsel angin buah 1.000 23,000.00 23,000.00
JUMLAH HARGA BAHAN 23,000.00
C PERALATAN
JUMLAH HARGA ALAT -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.015 80,000.00 1,200.00
Tukang kayu L.02 OH 0.150 110,000.00 16,500.00
Kepala tukang L.03 OH 0.015 120,000.00 1,800.00
Mandor L.04 OH 0.008 120,000.00 960.00
JUMLAH TENAGA KERJA 20,460.00
B BAHAN
Spring knip buah 1.000 25,300.00 25,300.00
JUMLAH HARGA BAHAN 25,300.00
C PERALATAN
JUMLAH HARGA ALAT -
III - 178
C PERALATAN
JUMLAH HARGA ALAT -
III - 179
A.4.6.2.10. Pemasangan 1 buah door closer
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.050 80,000.00 4,000.00
Tukang kayu L.02 OH 0.500 110,000.00 55,000.00
Kepala tukang L.03 OH 0.050 120,000.00 6,000.00
Mandor L.04 OH 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 65,360.00
B BAHAN
Door closer set 1.000 322,000.00 322,000.00
JUMLAH HARGA BAHAN 322,000.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.020 80,000.00 1,600.00
Tukang kayu L.02 OH 0.200 110,000.00 22,000.00
Kepala tukang L.03 OH 0.020 120,000.00 2,400.00
Mandor L.04 OH 0.001 120,000.00 120.00
JUMLAH TENAGA KERJA 26,120.00
B BAHAN
Kunci slot buah 1.000 13,800.00 13,800.00
JUMLAH HARGA BAHAN 13,800.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.050 80,000.00 4,000.00
Tukang kayu L.02 OH 0.500 110,000.00 55,000.00
Kepala tukang L.03 OH 0.050 120,000.00 6,000.00
Mandor L.04 OH 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 65,360.00
B BAHAN
Door holder buah 1.000 26,450.00 26,450.00
JUMLAH HARGA BAHAN 26,450.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.010 80,000.00 800.00
III - 180
Tukang kayu L.02 OH 0.100 110,000.00 11,000.00
Kepala tukang L.03 OH 0.010 120,000.00 1,200.00
Mandor L.04 OH 0.005 120,000.00 600.00
JUMLAH TENAGA KERJA 13,600.00
III - 181
B BAHAN
Door stop buah 1.000 46,000.00 46,000.00
JUMLAH HARGA BAHAN 46,000.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.060 80,000.00 4,800.00
Tukang kayu L.02 OH 0.600 110,000.00 66,000.00
Kepala tukang L.03 OH 0.060 120,000.00 7,200.00
Mandor L.04 OH 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 78,360.00
B BAHAN
Rel pintu sorong Set 1.000 402,500.00 402,500.00
JUMLAH HARGA BAHAN 402,500.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.025 80,000.00 2,000.00
Tukang kayu L.02 OH 0.250 110,000.00 27,500.00
Kepala tukang L.03 OH 0.025 120,000.00 3,000.00
Mandor L.04 OH 0.001 120,000.00 120.00
JUMLAH TENAGA KERJA 32,620.00
B BAHAN
Kunci lemari Set 1.000 163,300.00 163,300.00
JUMLAH HARGA BAHAN 163,300.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.015 80,000.00 1,200.00
Tukang kayu L.02 OH 0.150 110,000.00 16,500.00
Kepala tukang L.03 OH 0.015 120,000.00 1,800.00
Mandor L.04 OH 0.001 120,000.00 96.00
JUMLAH TENAGA KERJA 19,596.00
B BAHAN
Kaca tebal 3 mm m2 1.100 72,737.50 80,011.25
Sealant Kg 0.050 48,300.00 2,415.00
JUMLAH HARGA BAHAN 82,426.25
C PERALATAN
III - 182
D Jumlah (A+B+C) 102,022.25
E Overhead & Profit 15.00% 15,303.34
F Harga Satuan Pekerjaan (D+E) 117,325.59
III - 183
A.4.6.2.17. Pemasangan 1 m2 kaca tebal 5 mm
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.015 80,000.00 1,200.00
Tukang kayu L.02 OH 0.150 110,000.00 16,500.00
Kepala tukang L.03 OH 0.015 120,000.00 1,800.00
Mandor L.04 OH 0.001 120,000.00 96.00
JUMLAH TENAGA KERJA 19,596.00
B BAHAN
Kaca tebal 5 mm m2 1.100 86,250.00 94,875.00
Sealant Kg 0.050 48,300.00 2,415.00
JUMLAH HARGA BAHAN 97,290.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.017 80,000.00 1,360.00
Tukang kayu L.02 OH 0.170 110,000.00 18,700.00
Kepala tukang L.03 OH 0.017 120,000.00 2,040.00
Mandor L.04 OH 0.001 120,000.00 108.00
JUMLAH TENAGA KERJA 22,208.00
B BAHAN
Kaca tebal 8 mm m2 1.100 172,500.00 189,750.00
Sealant Kg 0.070 48,300.00 3,381.00
JUMLAH HARGA BAHAN 193,131.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.025 80,000.00 2,000.00
Tukang kayu L.02 OH 0.250 110,000.00 27,500.00
Kepala tukang L.03 OH 0.025 120,000.00 3,000.00
Mandor L.04 OH 0.001 120,000.00 156.00
JUMLAH TENAGA KERJA 32,656.00
B BAHAN
Kaca buram 12 mm m2 1.100 414,575.00 456,032.50
Sealant Kg 0.070 48,300.00 3,381.00
JUMLAH HARGA BAHAN 459,413.50
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
III - 184
Pekerja L.01 OH 0.015 80,000.00 1,200.00
Tukang kayu L.02 OH 0.150 110,000.00 16,500.00
Kepala tukang L.03 OH 0.015 120,000.00 1,800.00
Mandor L.04 OH 0.008 120,000.00 960.00
JUMLAH TENAGA KERJA 20,460.00
III - 185
B BAHAN
Kaca cermin 5 mm m2 1.100 155,250.00 170,775.00
JUMLAH HARGA BAHAN 170,775.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.017 80,000.00 1,360.00
Tukang kayu L.02 OH 0.170 110,000.00 18,700.00
Kepala tukang L.03 OH 0.017 120,000.00 2,040.00
Mandor L.04 OH 0.009 120,000.00 1,080.00
JUMLAH TENAGA KERJA 23,180.00
B BAHAN
Kaca cermin 8 mm m2 1.100 296,355.00 325,990.50
JUMLAH HARGA BAHAN 325,990.50
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.015 80,000.00 1,200.00
Tukang kayu L.02 OH 0.150 110,000.00 16,500.00
Kepala tukang L.03 OH 0.015 120,000.00 1,800.00
Mandor L.04 OH 0.008 120,000.00 960.00
JUMLAH TENAGA KERJA 20,460.00
B BAHAN
Kaca wireglassed 5 mm m2 1.100 241,500.00 265,650.00
JUMLAH HARGA BAHAN 265,650.00
C PERALATAN
JUMLAH HARGA ALAT -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.075 80,000.00 6,000.00
Tukang kayu L.02 OH 0.150 110,000.00 16,500.00
Kepala tukang L.03 OH 0.015 120,000.00 1,800.00
Mandor L.04 OH 0.004 120,000.00 480.00
JUMLAH TENAGA KERJA 24,780.00
B BAHAN
Kaca patri 5mm m2 1.100 2,300,000.00 2,530,000.00
Sealant Kg 0.050 48,300.00 2,415.00
JUMLAH HARGA BAHAN 2,532,415.00
C PERALATAN
JUMLAH HARGA ALAT -
III - 186
E Overhead & Profit 15.00% 383,579.25
F Harga Satuan Pekerjaan (D+E) 2,940,774.25
III - 187
A.4.7.1 HARGA SATUAN PEKERJAAN PENGECATAN
A.4.7.1.1. 1 m2 Pengikisan/pengerokan permukaan cat lama
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.150 80,000.00 12,000.00
Mandor L.04 OH 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 12,360.00
B BAHAN
Soda api Kg 0.050 28,750.00 1,437.50
JUMLAH HARGA BAHAN 1,437.50
C PERALATAN
JUMLAH HARGA ALAT -
A.4.7.1.4. 1 m2 Pengecatan bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.070 80,000.00 5,600.00
Tukang cat L.02 OH 0.009 110,000.00 990.00
Kepala tukang L.03 OH 0.006 120,000.00 720.00
Mandor L.04 OH 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 7,670.00
B BAHAN
Cat menie Kg 0.200 50,600.00 10,120.00
Plamuur Kg 0.150 23,000.00 3,450.00
Cat dasar Kg 0.170 50,600.00 8,602.00
Cat penutup (setara avian) Kg 0.260 55,200.00 14,352.00
Kuas buah 0.010 13,800.00 138.00
Pengencer Kg 0.030 27,600.00 828.00
Ampelas Lbr 0.200 3,450.00 690.00
JUMLAH HARGA BAHAN 38,180.00
C PERALATAN
JUMLAH HARGA ALAT -
III - 188
D Jumlah (A+B+C) 45,850.00
E Overhead & Profit 15.00% 6,877.50
F Harga Satuan Pekerjaan (D+E) 52,727.50
III - 189
A.4.7.1.5. Pengecatan 1 m2 bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 3 lapis cat penutup)
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.070 80,000.00 5,600.00
Tukang cat L.02 OH 0.105 110,000.00 11,550.00
Kepala tukang L.03 OH 0.004 120,000.00 480.00
Mandor L.04 OH 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 17,990.00
B BAHAN
Cat menie Kg 0.200 50,600.00 10,120.00
Plamuur Kg 0.150 23,000.00 3,450.00
Cat dasar Kg 0.170 50,600.00 8,602.00
Cat penutup (setara avian) Kg 0.350 55,200.00 19,320.00
Kuas buah 0.010 13,800.00 138.00
Pengencer Kg 0.030 27,600.00 828.00
Ampelas Lbr 0.200 3,450.00 690.00
JUMLAH HARGA BAHAN 43,148.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.040 80,000.00 3,200.00
Tukang cat L.02 OH 0.063 110,000.00 6,930.00
Kepala tukang L.03 OH 0.063 120,000.00 7,560.00
Mandor L.04 OH 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 18,050.00
B BAHAN
Teak oil L 0.360 34,787.50 12,523.50
JUMLAH HARGA BAHAN 12,523.50
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.040 80,000.00 3,200.00
Tukang cat L.02 OH 0.060 110,000.00 6,600.00
Kepala tukang L.03 OH 0.016 120,000.00 1,920.00
Mandor L.04 OH 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 12,080.00
B BAHAN
Politur L 0.150 43,642.50 6,546.38
Politur jadi L 0.372 49,565.00 18,438.18
Ampelas Lbr 2.000 3,450.00 6,900.00
JUMLAH HARGA BAHAN 31,884.56
C PERALATAN
III - 190
A.4.7.1.8. Pelaburan 1 m2 bidang kayu dengan cat residu dan ter
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.100 80,000.00 8,000.00
Mandor L.04 OH 0.006 120,000.00 720.00
JUMLAH TENAGA KERJA 8,720.00
B BAHAN
Residu atau ter L 0.350 31,625.00 11,068.75
JUMLAH HARGA BAHAN 11,068.75
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.160 80,000.00 12,800.00
Tukang cat L.02 OH 0.160 110,000.00 17,600.00
Kepala tukang L.03 OH 0.016 120,000.00 1,920.00
Mandor L.04 OH 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 32,680.00
B BAHAN
Vernis L 0.150 39,847.50 5,977.13
Dempul Kg 0.050 21,275.00 1,063.75
Ampelas Lbr 0.100 3,450.00 345.00
JUMLAH HARGA BAHAN 7,385.88
C PERALATAN
A.4.7.1.10. Pengecatan 1 m2 tembok baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.020 80,000.00 1,600.00
Tukang cat L.02 OH 0.063 110,000.00 6,930.00
Kepala tukang L.03 OH 0.006 120,000.00 756.00
Mandor L.04 OH 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 9,646.00
B BAHAN
Plamuur Kg 0.100 80,500.00 8,050.00
Cat dasar Kg 0.100 50,600.00 5,060.00
Cat penutup Kg 0.260 28,750.00 7,475.00
JUMLAH HARGA BAHAN 20,585.00
C PERALATAN
A.4.7.1.11. Pengecatan 1 m2 tembok lama (1 lapis cat dasar, 2 lapis cat penutup)
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.028 80,000.00 2,240.00
Tukang cat L.02 OH 0.042 110,000.00 4,620.00
III - 191
Kepala tukang L.03 OH 0.004 120,000.00 504.00
Mandor L.04 OH 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 7,724.00
III - 192
B BAHAN
Cat dasar Kg 0.120 50,600.00 6,072.00
Cat penutup Kg 0.180 28,750.00 5,175.00
JUMLAH HARGA BAHAN 11,247.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.028 80,000.00 2,240.00
Tukang cat L.02 OH 0.042 110,000.00 4,620.00
Kepala tukang L.03 OH 0.004 120,000.00 504.00
Mandor L.04 OH 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 7,724.00
B BAHAN
Kalkarium Kg 0.100 21,275.00 2,127.50
JUMLAH HARGA BAHAN 2,127.50
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.150 80,000.00 12,000.00
Tukang cat L.02 OH 0.001 110,000.00 110.00
Kepala tukang L.03 OH 0.000 120,000.00 12.00
Mandor L.04 OH 0.003 120,000.00 300.00
JUMLAH TENAGA KERJA 12,422.00
B BAHAN
Kapur sirih Kg 0.150 2,300.00 345.00
Ampelas Lbr 0.100 3,450.00 345.00
Alang-alang Ikat 0.250 11,500.00 2,875.00
JUMLAH HARGA BAHAN 3,565.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.040 80,000.00 3,200.00
Tukang cat L.02 OH 0.005 110,000.00 550.00
Kepala tukang L.03 OH 0.001 120,000.00 60.00
Mandor L.04 OH 0.003 120,000.00 300.00
JUMLAH TENAGA KERJA 4,110.00
B BAHAN
Kapur sirih Kg 0.300 2,300.00 690.00
Ampelas Lbr 0.200 3,450.00 690.00
Alang-alang Ikat 0.250 11,500.00 2,875.00
JUMLAH HARGA BAHAN 4,255.00
C PERALATAN
III - 193
JUMLAH HARGA ALAT -
III - 194
A.4.7.1.15. Pemasangan 1 m2 wallpaper
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.020 80,000.00 1,600.00
Tukang cat L.02 OH 0.200 110,000.00 22,000.00
Kepala tukang L.03 OH 0.020 120,000.00 2,400.00
Mandor L.04 OH 0.003 120,000.00 300.00
JUMLAH TENAGA KERJA 26,300.00
B BAHAN
Wall paper m2 1.200 80,500.00 96,600.00
Lem Kg 0.200 25,300.00 5,060.00
JUMLAH HARGA BAHAN 101,660.00
C PERALATAN
JUMLAH HARGA ALAT -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.020 80,000.00 1,600.00
Tukang cat L.02 OH 0.200 110,000.00 22,000.00
Kepala tukang L.03 OH 0.020 120,000.00 2,400.00
Mandor L.04 OH 0.003 120,000.00 300.00
JUMLAH TENAGA KERJA 26,300.00
B BAHAN
Menie besi Kg 0.100 50,600.00 5,060.00
Kwas buah 0.010 13,800.00 138.00
JUMLAH HARGA BAHAN 5,198.00
C PERALATAN
JUMLAH HARGA ALAT -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.250 80,000.00 20,000.00
Tukang cat L.02 OH 0.225 110,000.00 24,750.00
Kepala tukang L.02 OH 0.023 120,000.00 2,700.00
Mandor L.04 OH 0.008 120,000.00 900.00
JUMLAH TENAGA KERJA 48,350.00
B BAHAN
Menie besi Kg 0.100 50,600.00 5,060.00
Pengencer L 0.010 27,600.00 276.00
Kwas buah 0.010 13,800.00 138.00
Perancah kayu m3 0.002 4,025,000.00 8,050.00
JUMLAH HARGA BAHAN 13,524.00
C PERALATAN
JUMLAH HARGA ALAT -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.250 80,000.00 20,000.00
III - 195
Tukang cat L.02 OH 0.250 110,000.00 27,500.00
Kepala tukang L.03 OH 0.025 120,000.00 3,000.00
Mandor L.04 OH 0.001 120,000.00 156.00
JUMLAH TENAGA KERJA 50,656.00
III - 196
B BAHAN
Menie A Kg 0.100 50,600.00 5,060.00
Menie B Kg 0.100 50,600.00 5,060.00
Cat Kg 0.080 63,250.00 5,060.00
Kwas buah 0.010 13,800.00 138.00
Pengencer L 0.010 27,600.00 276.00
JUMLAH HARGA BAHAN 15,594.00
C PERALATAN
A.4.7.1.19. Pengecatan 1 m2 permukaan baja galvanis secara manual sistem 1 lapis cat mutakhir
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.060 80,000.00 4,800.00
Tukang cat L.02 OH 0.060 110,000.00 6,600.00
Kepala tukang L.03 OH 0.012 120,000.00 1,440.00
Mandor L.04 OH 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 13,200.00
B BAHAN
Cat Kg 0.300 63,250.00 18,975.00
Kwas buah 0.010 13,800.00 138.00
Pengencer L 0.010 27,600.00 276.00
JUMLAH HARGA BAHAN 19,389.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.400 80,000.00 32,000.00
Tukang cat L.02 OH 0.800 110,000.00 88,000.00
Kepala tukang L.03 OH 0.080 120,000.00 9,600.00
Mandor L.04 OH 0.020 120,000.00 2,400.00
JUMLAH TENAGA KERJA 132,000.00
B BAHAN
Cat dasar Kg 0.110 50,600.00 5,566.00
Cat antara Kg 0.170 40,250.00 6,842.50
Cat penutup Kg 0.080 63,250.00 5,060.00
Kwas buah 0.010 13,800.00 138.00
Pengencer L 0.010 27,600.00 276.00
JUMLAH HARGA BAHAN 17,882.50
C PERALATAN
A.4.7.1.21. Pengecatan 1 m2 permukaan baja galvanis secara semprot sistem 3 lapis cat mutakhir
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.400 80,000.00 32,000.00
Tukang cat L.02 OH 0.700 110,000.00 77,000.00
Kepala tukang L.03 OH 0.070 120,000.00 8,400.00
III - 197
Mandor L.04 OH 0.020 120,000.00 2,400.00
JUMLAH TENAGA KERJA 119,800.00
B BAHAN
Cat dasar Kg 0.300 50,600.00 15,180.00
Pengencer L 0.010 27,600.00 276.00
JUMLAH HARGA BAHAN 15,456.00
III - 198
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 2.000 80,000.00 160,000.00
Tukang cat L.02 OH 12.000 110,000.00 1,320,000.00
Kepala tukang L.03 OH 1.200 120,000.00 144,000.00
Mandor L.04 OH 0.100 120,000.00 12,000.00
JUMLAH TENAGA KERJA 1,636,000.00
B BAHAN
Wood filler kg 1.500 29,900.00 44,850.00
Woodstain kg 1.500 54,050.00 81,075.00
Sanding kg 1.500 55,200.00 82,800.00
Melamic kg 2.400 50,025.00 120,060.00
Thinner L 2.000 13,225.00 26,450.00
Ampelas Lbr 6.000 3,450.00 20,700.00
Lbr JUMLAH HARGA BAHAN 375,935.00
C PERALATAN
Compressor jam 78,556.50 -
JUMLAH HARGA ALAT -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 3.300 80,000.00 264,000.00
Tukang batu L.02 OH 1.100 110,000.00 121,000.00
Kepala tukang L.03 OH 0.010 120,000.00 1,200.00
Mandor L.04 OH 0.160 120,000.00 19,200.00
JUMLAH TENAGA KERJA 405,400.00
B BAHAN
Closet duduk Unit 1.000 1,422,550.00 1,422,550.00
Perlengkapan Ls 6% x closet 85,353.00 85,353.00
JUMLAH HARGA BAHAN 1,507,903.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
TENAGA
Pekerja L.01 OH 1.000 80,000.00 80,000.00
Tukang batu L.02 OH 1.500 110,000.00 165,000.00
Kepala tukang L.03 OH 0.150 120,000.00 18,000.00
Mandor L.04 OH 0.160 120,000.00 19,200.00
JUMLAH TENAGA KERJA 282,200.00
B BAHAN
Closet jongkok Unit 1.000 161,000.00 161,000.00
Semen Portland Kg 6.000 1,633.00 9,798.00
Pasir pasang M3 0.010 222,812.50 2,228.13
JUMLAH HARGA BAHAN 173,026.13
C PERALATAN
III - 199
JUMLAH HARGA ALAT -
III - 200
A.5.1.1 3. Pemasangan 1 buah closet jongkok teraso
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.000 80,000.00 80,000.00
Tukang batu L.02 OH 1.500 110,000.00 165,000.00
Kepala tukang L.03 OH 0.150 120,000.00 18,000.00
Mandor L.04 OH 0.050 120,000.00 6,000.00
JUMLAH TENAGA KERJA 269,000.00
B BAHAN
Closet jongkok Unit 1.000 115,000.00 115,000.00
Semen Portland Kg 6.000 1,633.00 9,798.00
Pasir pasang M3 0.010 222,812.50 2,228.13
Bata merah buah 7.000 900.00 6,300.00
JUMLAH HARGA BAHAN 133,326.13
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.000 80,000.00 80,000.00
Tukang batu L.02 OH 1.000 110,000.00 110,000.00
Kepala tukang L.03 OH 0.100 120,000.00 12,000.00
Mandor L.04 OH 0.050 120,000.00 6,000.00
JUMLAH TENAGA KERJA 208,000.00
B BAHAN
Urinoir Unit 1.000 746,350.00 746,350.00
Semen Portland Kg 6.000 1,633.00 9,798.00
Pasir pasang M3 0.010 222,812.50 2,228.13
Perlengkapan % 0.300 223,905.00 223,905.00
JUMLAH HARGA BAHAN 982,281.13
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.200 80,000.00 96,000.00
Tukang batu L.02 OH 1.450 110,000.00 159,500.00
Kepala tukang L.03 OH 0.150 120,000.00 18,000.00
Mandor L.04 OH 0.060 120,000.00 7,200.00
JUMLAH TENAGA KERJA 280,700.00
B BAHAN
Wastafel Unit 1.200 788,900.00 946,680.00
Semen Portland Kg 6.000 1,633.00 9,798.00
Pasir pasang M3 0.010 222,812.50 2,228.13
Perlengkapan % 0.120 113,601.60 113,601.60
JUMLAH HARGA BAHAN 1,072,307.73
C PERALATAN
III - 201
A.5.1.1 7. (K3) Pemasangan 1 buah bak fiberglass vol 1 m3
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 3.000 80,000.00 240,000.00
Tukang batu L.02 OH 4.500 110,000.00 495,000.00
Kepala tukang L.03 OH 0.050 120,000.00 6,000.00
Mandor L.04 OH 0.900 120,000.00 108,000.00
JUMLAH TENAGA KERJA 849,000.00
B BAHAN
Bak fiberglass Unit 1.000 253,000.00 253,000.00
Perlengkapan Ls 0.120 30,360.00 30,360.00
JUMLAH HARGA BAHAN 283,360.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 3.000 80,000.00 240,000.00
Tukang batu L.02 OH 4.500 110,000.00 495,000.00
Kepala tukang L.03 OH 0.050 120,000.00 6,000.00
Mandor L.04 OH 0.900 120,000.00 108,000.00
JUMLAH TENAGA KERJA 849,000.00
B BAHAN
Bak fiberglass Unit 1.000 253,000.00 253,000.00
Perlengkapan Ls 0.120 30,360.00 30,360.00
JUMLAH HARGA BAHAN 283,360.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.300 80,000.00 24,000.00
Tukang batu L.02 OH 0.450 110,000.00 49,500.00
Kepala tukang L.03 OH 0.045 120,000.00 5,400.00
Mandor L.04 OH 0.015 120,000.00 1,800.00
JUMLAH TENAGA KERJA 80,700.00
B BAHAN
Bak air fiberglass Unit 1.000 253,000.00 253,000.00
Perlengkapan % 0.120 30,360.00 30,360.00
JUMLAH HARGA BAHAN 283,360.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
III - 202
Pekerja L.01 OH 0.030 80,000.00 2,400.00
Tukang batu L.02 OH 0.300 110,000.00 33,000.00
Kepala tukang L.03 OH 0.030 120,000.00 3,600.00
Mandor L.04 OH 0.015 120,000.00 1,800.00
JUMLAH TENAGA KERJA 40,800.00
III - 203
B BAHAN
Bak cuci piring Unit 1.000 460,000.00 460,000.00
Waterdrain buah 1.000 442,750.00 442,750.00
JUMLAH HARGA BAHAN 902,750.00
C PERALATAN
JUMLAH HARGA ALAT -
A.5.1.1 15. Pemasangan 1 buah bak kontrol pasangan bata 30x30 tinggi 35 cm
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 2.160 80,000.00 172,800.00
Tukang batu L.02 OH 0.720 110,000.00 79,200.00
Kepala tukang L.03 OH 0.072 120,000.00 8,640.00
Mandor L.04 OH 0.011 120,000.00 1,320.00
JUMLAH TENAGA KERJA 261,960.00
B BAHAN
Bata merah buah 40.000 900.00 36,000.00
Semen portland Kg 44.000 1,633.00 71,852.00
Pasir pasang M3 0.070 222,812.50 15,596.88
Pasir beton M3 0.060 244,375.00 14,662.50
Kerikil M3 0.070 230,000.00 16,100.00
Baja tulangan Kg 1.600 20,872.50 33,396.00
JUMLAH HARGA BAHAN 187,607.38
C PERALATAN
III - 204
D Jumlah (A+B+C) 449,567.38
E Overhead & Profit 15.00% 67,435.11
F Harga Satuan Pekerjaan (D+E) 517,002.48
III - 205
A.5.1.1 16. Pemasangan 1 buah bak kontrol pasangan bata 45cm x 45cm tinggi 50 cm
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 3.200 80,000.00 256,000.00
Tukang cat L.02 OH 1.500 110,000.00 165,000.00
Kepala tukang L.03 OH 0.011 120,000.00 1,320.00
Mandor L.04 OH 0.016 120,000.00 1,920.00
JUMLAH TENAGA KERJA 424,240.00
B BAHAN
Bata merah buah 70.000 900.00 63,000.00
Semen portland Kg 77.000 1,633.00 125,741.00
Pasir pasang M3 0.130 222,812.50 28,965.63
Pasir beton M3 0.090 244,375.00 21,993.75
Kerikil M3 0.020 230,000.00 4,600.00
Baja tulangan Kg 2.600 20,872.50 54,268.50
JUMLAH HARGA BAHAN 298,568.88
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 3.200 80,000.00 256,000.00
Tukang batu L.02 OH 1.150 110,000.00 126,500.00
Kepala tukang L.03 OH 0.011 120,000.00 1,320.00
Mandor L.04 OH 0.016 120,000.00 1,920.00
JUMLAH TENAGA KERJA 385,740.00
B BAHAN
Bata merah buah 123.000 900.00 110,700.00
Semen portland Kg 114.000 1,633.00 186,162.00
Pasir pasang M3 0.184 222,812.50 40,997.50
Pasir beton M3 0.120 244,375.00 29,325.00
Kerikil M3 0.033 230,000.00 7,590.00
Baja tulangan Kg 4.850 20,872.50 101,231.63
JUMLAH HARGA BAHAN 476,006.13
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.054 80,000.00 4,320.00
Tukang batu L.02 OH 0.090 110,000.00 9,900.00
Kepala tukang L.03 OH 0.009 120,000.00 1,080.00
Mandor L.04 OH 0.027 120,000.00 3,240.00
JUMLAH TENAGA KERJA 18,540.00
B BAHAN
Pipa galvanis ½” M 1.200 43,077.20 51,692.64
Perlengkapan Ls 0.350 43,077.20 15,077.02
JUMLAH HARGA BAHAN 66,769.66
C PERALATAN
III - 206
A.5.1.1 19. Pemasangan 1 buah kran diameter ½” atau ¾ ”
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.054 80,000.00 4,320.00
Tukang batu L.02 OH 0.090 110,000.00 9,900.00
Kepala tukang L.03 OH 0.009 120,000.00 1,080.00
Mandor L.04 OH 0.027 120,000.00 3,240.00
JUMLAH TENAGA KERJA 18,540.00
B BAHAN
Pipa galvanis 3/4” M 1.200 49,425.00 59,310.00
Perlengkapan % 0.350 20,758.50 20,758.50
JUMLAH HARGA BAHAN 80,068.50
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.054 80,000.00 4,320.00
Tukang batu L.02 OH 0.090 110,000.00 9,900.00
Kepala tukang L.03 OH 0.009 120,000.00 1,080.00
Mandor L.04 OH 0.027 120,000.00 3,240.00
JUMLAH TENAGA KERJA 18,540.00
B BAHAN
Pipa galvanis 1” M 1.200 61,258.70 73,510.44
Perlengkapan % 0.350 73,510.44 73,510.44
JUMLAH HARGA BAHAN 147,020.88
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.108 80,000.00 8,640.00
Tukang batu L.02 OH 0.180 110,000.00 19,800.00
III - 207
Kepala tukang L.03 OH 0.018 120,000.00 2,160.00
Mandor L.04 OH 0.005 120,000.00 600.00
JUMLAH TENAGA KERJA 31,200.00
III - 208
B BAHAN
Pipa galvanis 11/2” M 1.200 88,015.62 105,618.74
Perlengkapan % 0.350 105,618.74 105,618.74
JUMLAH HARGA BAHAN 211,237.48
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.135 80,000.00 10,800.00
Tukang batu L.02 OH 0.225 110,000.00 24,750.00
Kepala tukang L.03 OH 0.023 120,000.00 2,760.00
Mandor L.04 OH 0.007 120,000.00 840.00
JUMLAH TENAGA KERJA 39,150.00
B BAHAN
Pipa galvanis 3” M 1.200 190,395.83 228,475.00
Perlengkapan % 0.350 79,966.25 79,966.25
JUMLAH HARGA BAHAN 308,441.25
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.135 80,000.00 10,800.00
Tukang batu L.02 OH 0.225 110,000.00 24,750.00
Kepala tukang L.03 OH 0.023 120,000.00 2,760.00
Mandor L.04 OH 0.007 120,000.00 840.00
JUMLAH TENAGA KERJA 39,150.00
B BAHAN
Pipa galvanis 4” M 1.200 285,011.25 342,013.50
Perlengkapan % 0.350 119,704.73 119,704.73
JUMLAH HARGA BAHAN 461,718.23
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.036 80,000.00 2,880.00
Tukang batu L.02 OH 0.060 110,000.00 6,600.00
Kepala tukang L.03 OH 0.006 120,000.00 720.00
Mandor L.04 OH 0.002 120,000.00 240.00
JUMLAH TENAGA KERJA 10,440.00
B BAHAN
Pipa PVC 1/2” M 1.200 5,733.75 6,880.50
Perlengkapan % 0.350 2,408.18 2,408.18
JUMLAH HARGA BAHAN 9,288.68
C PERALATAN
III - 209
D Jumlah (A+B+C) 19,728.68
E Overhead & Profit 15.00% 2,959.30
F Harga Satuan Pekerjaan (D+E) 22,687.98
III - 210
A.5.1.1 26. Pemasangan 1 m’ pipa PVC tipe AW diameter ¾ ”
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.030 80,000.00 2,400.00
Tukang batu L.02 OH 0.060 110,000.00 6,600.00
Kepala tukang L.03 OH 0.006 120,000.00 720.00
Mandor L.04 OH 0.002 120,000.00 240.00
JUMLAH TENAGA KERJA 9,960.00
B BAHAN
Pipa PVC 3/4” M 1.200 7,903.50 9,484.20
Perlengkapan % 0.350 3,319.47 3,319.47
JUMLAH HARGA BAHAN 12,803.67
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.036 80,000.00 2,880.00
Tukang batu L.02 OH 0.060 110,000.00 6,600.00
Kepala tukang L.03 OH 0.006 120,000.00 720.00
Mandor L.04 OH 0.002 120,000.00 240.00
JUMLAH TENAGA KERJA 10,440.00
B BAHAN
Pipa PVC 1” M 1.200 10,915.09 13,098.11
Perlengkapan % 0.350 4,584.34 4,584.34
JUMLAH HARGA BAHAN 17,682.45
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.054 80,000.00 4,320.00
Tukang batu L.02 OH 0.090 110,000.00 9,900.00
Kepala tukang L.03 OH 0.009 120,000.00 1,080.00
Mandor L.04 OH 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 15,660.00
B BAHAN
Pipa PVC 11/2” M 1.200 18,562.50 22,275.00
Perlengkapan % 0.350 7,796.25 7,796.25
JUMLAH HARGA BAHAN 30,071.25
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
III - 211
Pekerja L.01 OH 0.054 80,000.00 4,320.00
Tukang batu L.02 OH 0.090 110,000.00 9,900.00
Kepala tukang L.03 OH 0.009 120,000.00 1,080.00
Mandor L.04 OH 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 15,660.00
III - 212
B BAHAN
Pipa PVC 2” M 1.200 23,859.06 28,630.88
Perlengkapan % 0.350 10,020.81 10,020.81
JUMLAH HARGA BAHAN 38,651.68
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.081 80,000.00 6,480.00
Tukang batu L.02 OH 0.135 110,000.00 14,850.00
Kepala tukang L.03 OH 0.014 120,000.00 1,620.00
Mandor L.04 OH 0.004 120,000.00 480.00
JUMLAH TENAGA KERJA 23,430.00
B BAHAN
Pipa PVC 21/2” M 1.200 34,774.38 41,729.25
Perlengkapan % 0.350 14,605.24 14,605.24
JUMLAH HARGA BAHAN 56,334.49
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.081 80,000.00 6,480.00
Tukang batu L.02 OH 0.135 110,000.00 14,850.00
Kepala tukang L.03 OH 0.014 120,000.00 1,620.00
Mandor L.04 OH 0.004 120,000.00 480.00
JUMLAH TENAGA KERJA 23,430.00
B BAHAN
Pipa PVC 3” M 1.200 48,362.50 58,035.00
Perlengkapan % 0.350 20,312.25 20,312.25
JUMLAH HARGA BAHAN 78,347.25
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.081 80,000.00 6,480.00
Tukang batu L.02 OH 0.135 110,000.00 14,850.00
Kepala tukang L.03 OH 0.014 120,000.00 1,620.00
Mandor L.04 OH 0.004 120,000.00 480.00
JUMLAH TENAGA KERJA 23,430.00
B BAHAN
Pipa PVC 4” M 1.200 79,850.00 95,820.00
Perlengkapan % 0.350 33,537.00 33,537.00
JUMLAH HARGA BAHAN 129,357.00
C PERALATAN
III - 213
D Jumlah (A+B+C) 152,787.00
E Overhead & Profit 15.00% 22,918.05
F Harga Satuan Pekerjaan (D+E) 175,705.05
III - 214
A.5.1.1 33. Pemasangan 1 m’ pipa air limbah jenis pipa tanah Ǿ 20 cm
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.080 80,000.00 6,400.00
Tukang batu L.02 OH 0.040 110,000.00 4,400.00
Kepala tukang L.03 OH 0.004 120,000.00 480.00
Mandor L.04 OH 0.004 120,000.00 480.00
JUMLAH TENAGA KERJA 11,760.00
B BAHAN
Pipa tanah buah 1.600 173,200.00 277,120.00
Semen portlan Kg 35.000 1,633.00 57,155.00
Pasir pasang M3 0.014 222,812.50 3,119.38
Pasir urug M3 0.014 222,755.00 3,118.57
JUMLAH HARGA BAHAN 340,512.95
C PERALATAN
A.5.1.1 34. Pemasangan 1 m’ pipa air limbah jenis pipa tanah diameter 15 cm
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.060 80,000.00 4,800.00
Tukang batu L.02 OH 0.030 110,000.00 3,300.00
Kepala tukang L.03 OH 0.003 120,000.00 360.00
Mandor L.04 OH 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 8,820.00
B BAHAN
Pipa tanah dia 15 buah 1.600 113,200.00 181,120.00
Semen portlan Kg 0.680 1,633.00 1,110.44
Pasir pasang M3 0.013 222,812.50 2,896.56
Pasir urug M3 0.011 222,755.00 2,450.31
JUMLAH HARGA BAHAN 187,577.31
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.140 80,000.00 11,200.00
Tukang batu L.02 OH 0.070 110,000.00 7,700.00
Kepala tukang L.03 OH 0.007 120,000.00 840.00
Mandor L.04 OH 7.000 120,000.00 840,000.00
JUMLAH TENAGA KERJA 859,740.00
B BAHAN
Pipa beton dia. 15-20 buah 1.100 44,300.00 48,730.00
Bata merah M3 0.027 900.00 24.30
Semen portlan Kg 3.920 1,633.00 6,401.36
Pasir pasang M3 0.056 222,812.50 12,477.50
Pasir urug M3 0.024 222,755.00 5,346.12
JUMLAH HARGA BAHAN 72,979.28
C PERALATAN
III - 215
A.5.1.1.36. Pemasangan 1 m’ pipa beton diameter 30 – 100 cm
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.380 80,000.00 30,400.00
Tukang batu L.02 OH 0.190 110,000.00 20,900.00
Kepala tukang L.03 OH 0.019 120,000.00 2,280.00
Mandor L.04 OH 0.019 120,000.00 2,280.00
JUMLAH TENAGA KERJA 55,860.00
B BAHAN
Pipa beton dia. 30-100 buah 1.100 66,000.00 72,600.00
Bata merah M3 0.550 900.00 495.00
Semen portlan Kg 10.300 1,633.00 16,819.90
Pasir pasang M3 0.061 222,812.50 13,591.56
Pasir urug M3 0.069 222,755.00 15,370.10
JUMLAH HARGA BAHAN 118,876.56
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Upah % 1.000 2,680,650.00 2,680,650.00
JUMLAH TENAGA KERJA 2,680,650.00
B BAHAN
Pipa listrik 5/8” btg 3.000 5,750.00 17,250.00
Kabel m 15.000 9,200.00 138,000.00
T Dus buah 1.000 2,300.00 2,300.00
L Bow buah 2.000 2,300.00 4,600.00
Klem biasa buah 24.000 103,500.00 2,484,000.00
MCB buah 1.000 34,500.00 34,500.00
JUMLAH HARGA BAHAN 2,680,650.00
C PERALATAN
III - 216
TAMBAHAN / LAIN-LAIN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pembantu tukang oh 0.200 80,000.00 16,000.00
Tukang kayu oh 0.600 110,000.00 66,000.00
Kepala tukang oh 0.060 120,000.00 7,200.00
Mandor oh 0.020 120,000.00 2,400.00
JUMLAH TENAGA KERJA 91,600.00
B BAHAN
Kayu Kaso 5/7 (kayu hutan) m3 0.020 4,025,000.00 80,500.00
Paku Biasa 2-5 kg 0.250 23,000.00 5,750.00
Kayu Dolken dia.8 8-10/4 m' btg 1.500 74,750.00 112,125.00
Triplek 6 mm lbr 0.350 146,050.00 51,117.50
Cetak papan nama dg bhn flexi cetak digital print m' 1.000 28,750.00 28,750.00
JUMLAH HARGA BAHAN 278,242.50
C PERALATAN -
JUMLAH HARGA ALAT -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pembantu tukang oh 0.250 80,000.00 20,000.00
Tukang batu oh 0.125 110,000.00 13,750.00
Kepala tukang oh 0.013 120,000.00 1,560.00
Mandor oh 0.013 120,000.00 1,560.00
JUMLAH TENAGA KERJA 36,870.00
B BAHAN
ubin granit bh 0.020 64,630.00 1,292.60
portland cement kg 0.250 1,633.00 408.25
pasir pasang m3 1.500 222,812.50 334,218.75
semen warna kg 0.350 6,900.00 2,415.00
JUMLAH HARGA BAHAN 338,334.60
C PERALATAN -
JUMLAH HARGA ALAT -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pembantu tukang oh 0.250 80,000.00 20,000.00
Tukang batu oh 0.120 110,000.00 13,200.00
Kepala tukang oh 0.012 120,000.00 1,440.00
Mandor oh 0.013 120,000.00 1,560.00
JUMLAH TENAGA KERJA 36,200.00
B BAHAN
keramik 40 x 40 bh 6.630 12,650.00 83,869.50
portland cement kg 9.800 1,633.00 16,003.40
pasir pasang m3 0.045 222,812.50 10,026.56
semen warna kg 1.300 6,900.00 8,970.00
JUMLAH HARGA BAHAN 118,869.46
C PERALATAN -
JUMLAH HARGA ALAT -
III - 217
SNI 03-7395:2008 N0.6.9 Memasang 1 m2 lantai granit ukuran 60 x 60
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pembantu tukang oh 0.375 80,000.00 30,000.00
Tukang batu oh 0.180 110,000.00 19,800.00
Kepala tukang oh 0.018 120,000.00 2,160.00
Mandor oh 0.020 120,000.00 2,340.00
JUMLAH TENAGA KERJA 54,300.00
B BAHAN
granito 60 x 60 bh 3.000 66,585.00 199,755.00
portland cement kg 14.700 1,633.00 24,005.10
pasir pasang m3 0.068 222,812.50 15,039.84
semen warna kg 1.950 6,900.00 13,455.00
JUMLAH HARGA BAHAN 252,254.94
C PERALATAN -
JUMLAH HARGA ALAT -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pembantu tukang oh 0.060 80,000.00 4,800.00
Tukang batu oh 0.060 110,000.00 6,600.00
Kepala tukang oh 0.006 120,000.00 720.00
Mandor oh 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 12,480.00
B BAHAN
List gypsum profil m' 1.050 20,700.00 21,735.00
Tepung gypsum kg 0.150 21,275.00 3,191.25
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pembantu tukang oh 0.100 80,000.00 8,000.00
Tukang batu oh 0.200 110,000.00 22,000.00
Kepala tukang oh 0.020 120,000.00 2,400.00
Mandor oh 0.005 120,000.00 600.00
JUMLAH TENAGA KERJA 33,000.00
B BAHAN
woodplank bh 0.250 69,000.00 17,250.00
Paku biasa 2" - 5" kg 0.050 23,000.00 1,150.00
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
III - 218
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.200 80,000.00 16,000.00
Mandor L.15 OH 0.100 120,000.00 12,000.00
JUMLAH TENAGA KERJA 28,000.00
III - 219
B BAHAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.000 80,000.00 80,000.00
Mandor L.04 OH 0.050 120,000.00 6,000.00
JUMLAH TENAGA KERJA 86,000.00
B BAHAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 4.00 80,000.00 320,000.00
Tukang kayu L.02 OH 6.00 110,000.00 660,000.00
Kepala tukang L.03 OH 0.60 120,000.00 72,000.00
Mandor L.04 OH 0.20 120,000.00 24,000.00
JUMLAH TENAGA KERJA 1,076,000.00
B BAHAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.00 80,000.00 80,000.00
Mandor L.04 OH 0.10 120,000.00 12,000.00
JUMLAH TENAGA KERJA 92,000.00
B BAHAN
III - 220
JUMLAH 105,800.00
F Harga Satuan Pekerjaan (D+E) Untuk 1 m2, maka : Upah diambil : 2/3 X Rp 10,580.00 7,053.33
III - 221
SNI 2012 1 m³ Bongkaran Beton Bertulang
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 6.667 80,000.00 533,360.00
Mandor L.04 OH 0.333 120,000.00 39,960.00
JUMLAH TENAGA KERJA 573,320.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 6.667 80,000.00 533,360.00
Mandor L.04 OH 0.033 120,000.00 3,960.00
JUMLAH TENAGA KERJA 537,320.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A BAHAN
Semen portland kg 232 1,633.00 378,856.00
Pasir beton m3 0.52 244,375.00 127,075.00
Spleet 2/3 cm m3 0.78 345,000.00 269,100.00
JUMLAH HARGA BAHAN 775,031.00
B TENAGA
Pekerja Oh 1.65 80,000.00 132,000.00
Tukang batu Oh 0.25 110,000.00 27,500.00
Kepala tukang Oh 0.025 120,000.00 3,000.00
Mandor Oh 0.08 120,000.00 9,600.00
JUMLAH TENAGA KERJA 172,100.00
C PERALATAN
JUMLAH HARGA ALAT -
- 1m2 Pasang Plafond Rangka Holo dan Dengan Penutup GRC Berikut Pengecatan
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A BAHAN
GRC 4 mm lbr 0.35 78,200.00 27,370.00
Holo 4/4 meni btg 1.00 13,915.00 13,915.00
Holo 2/4 meni btg 0.34 12,650.00 4,301.00
Kawat Bwg 12 kg 0.10 11,500.00 1,150.00
Paku screw 2.5 cm bh 20.00 57.50 1,150.00
Adhesive kg 0.02 6,900.00 138.00
Kain kasa m' 2.00 460.00 920.00
Cat penutup 2 kali kg 0.03 28,750.00 862.50
Paku beton bh 4.00 201.25 805.00
JUMLAH HARGA BAHAN 50,611.50
III - 222
B TENAGA
Pekerja oh 0.17 80,000.00 13,600.00
Tukang oh 0.28 110,000.00 30,800.00
Kep Tukang oh 0.03 120,000.00 3,600.00
Mandor oh 0.07 120,000.00 8,400.00
JUMLAH TENAGA KERJA 56,400.00
C PERALATAN
JUMLAH HARGA ALAT -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A BAHAN
Kabel Listrik NYA 3 x 2,5 mm m' 11.00 7,475.00 82,225.00
Instalasi lapu dan stop kontak ttk 1.00 37,375.00 37,375.00
JUMLAH HARGA BAHAN 119,600.00
B TENAGA
Pembantu tukang Listrik Oh 0.48 80,000.00 38,400.00
Tukang Listrik Oh 0.048 110,000.00 5,280.00
Kepala tukang Listrik Oh 0.048 120,000.00 5,760.00
JUMLAH TENAGA KERJA 49,440.00
C PERALATAN
JUMLAH HARGA ALAT -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
BAHAN
Stop Kontak bh 1.000 14,950.00 14,950.00
JUMLAH HARGA BAHAN 14,950.00
TENAGA
Pembantu tukang Listrik Oh 0.2 80,000.00 16,000.00
Tukang Listrik Oh 0.02 110,000.00 2,200.00
Kepala tukang Listrik Oh 0.02 120,000.00 2,400.00
JUMLAH TENAGA KERJA 20,600.00
C PERALATAN
JUMLAH HARGA ALAT -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
BAHAN
Lampu SL 18 watt + fitting bh 1.000 41,400.00 41,400.00
JUMLAH HARGA BAHAN 41,400.00
TENAGA
Pembantu tukang Listrik Oh 0.2 80,000.00 16,000.00
Tukang Listrik Oh 0.02 110,000.00 2,200.00
Kepala tukang Listrik 0 0.02 120,000.00 2,400.00
JUMLAH TENAGA KERJA 20,600.00
C PERALATAN
JUMLAH HARGA ALAT -
III - 223
- 1 Unit Pekerjaan Sekring Kast
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
BAHAN
Sekring Kast bh 1.000 46,000.00 46,000.00
JUMLAH HARGA BAHAN 46,000.00
TENAGA
Pembantu tukang Listrik Oh 0.2 80,000.00 16,000.00
Tukang Listrik Oh 0.02 110,000.00 2,200.00
Kepala tukang Listrik Oh 0.02 120,000.00 2,400.00
JUMLAH TENAGA KERJA 20,600.00
C PERALATAN
JUMLAH HARGA ALAT -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
BAHAN
MCB BOX bh 1.000 34,500.00 34,500.00
JUMLAH HARGA BAHAN 34,500.00
TENAGA
Pembantu tukang Listrik Oh 0.2 80,000.00 16,000.00
Tukang Listrik Oh 0.02 110,000.00 2,200.00
Kepala tukang Listrik Oh 0.02 120,000.00 2,400.00
JUMLAH TENAGA KERJA 20,600.00
C PERALATAN
JUMLAH HARGA ALAT -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
BAHAN
Over Spaneng m' 1.000 10,350.00 10,350.00
JUMLAH HARGA BAHAN 10,350.00
TENAGA
Pembantu tukang Listrik Oh 0.24 80,000.00 19,200.00
Tukang Listrik Oh 0.024 110,000.00 2,640.00
Kepala tukang Listrik Oh 0.024 120,000.00 2,880.00
JUMLAH TENAGA KERJA 24,720.00
C PERALATAN
JUMLAH HARGA ALAT -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
BAHAN
Saklar Ganda bh 1.000 18,400.00 18,400.00
JUMLAH HARGA BAHAN 18,400.00
TENAGA
Pembantu tukang Listrik Oh 0.4 80,000.00 32,000.00
Tukang Listrik Oh 0.04 110,000.00 4,400.00
Kepala tukang Listrik Oh 0.04 120,000.00 4,800.00
JUMLAH TENAGA KERJA 41,200.00
C PERALATAN
JUMLAH HARGA ALAT -
III - 224
D Jumlah (A+B+C) 59,600.00
E Overhead & Profit 15.00% 8,940.00
F Harga Satuan Pekerjaan (D+E) 68,540.00
III - 225
- 1 Bh Pekerjaan Saklar Tunggal
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
BAHAN
Saklar tunggal bh 1.000 14,950.00 14,950.00
JUMLAH HARGA BAHAN 14,950.00
TENAGA
Pembantu tukang Listrik Oh 0.4 80,000.00 32,000.00
Tukang Listrik Oh 0.04 110,000.00 4,400.00
Kepala tukang Listrik Oh 0.04 120,000.00 4,800.00
JUMLAH TENAGA KERJA 41,200.00
C PERALATAN
JUMLAH HARGA ALAT -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.500 80,000.00 120,000.00
Tukang batu L.02 OH 0.750 110,000.00 82,500.00
Kepala tukang L.03 OH 0.075 120,000.00 9,000.00
Mandor L.04 OH 0.075 120,000.00 9,000.00
JUMLAH TENAGA KERJA 220,500.00
B BAHAN
Batu belah m3 1.200 345,000.00 414,000.00
Semen Portland Kg 163.000 1,633.00 266,179.00
Pasir pasang m3 0.520 222,812.50 115,862.50
JUMLAH HARGA BAHAN 796,041.50
C PERALATAN
Sumber, 2020
III - 226
Analisa EI-311a
A. TENAGA
B. BAHAN
C. PERALATAN
IV - 227
Analisa EI-321.rob
A. TENAGA
B. BAHAN
C. PERALATAN
1. Excavator (E10) Jam 0.0101 432,395.76 4,356.88
2. Dump Truck (E08) Jam 0.6103 261,574.70 159,650.42
3. Motor Grader (E13) Jam 0.0037 0.00 0.00
4 Vibro Roller (E19) Jam 0.0042 282,396.73 1,181.38
5. Water tank truck (E23) Jam 0.0070 362,404.86 2,547.02
6 Alat Bantu Ls 1.0000 0.00 0.00
IV - 228
Analisa EI-322.rob
A. TENAGA
B. BAHAN
C. PERALATAN
1. Wheel Loader (E15) Jam 0.0085 477,782.58 4,063.35
2. Dump Truck (E08) Jam 0.6073 261,574.70 158,866.31
3. Motor Grader (E13) Jam 0.0040 0.00 0.00
3. Tandem (E17) Jam 0.0161 445,867.99 7,180.49
4. Water Tanker (E23) Jam 0.0070 362,404.86 2,547.02
5. Alat Bantu Ls 1.0000 0.00 0.00
IV - 229
Analisa EI-331.rob
A. TENAGA
B. BAHAN
C. PERALATAN
1. Motor Grader (E13) jam 0.0006 0.00 0.00
2. Vibro Roller (E19) jam 0.0005 282,396.73 132.91
3 Alat Bantu Ls 1.0000 0.00 0.00
IV - 230
Analisa EI-611a
A. TENAGA
B. BAHAN
C. PERALATAN
IV - 231
Analisa EI-612a
A. TENAGA
B. BAHAN
C. PERALATAN
IV - 232
Analisa EI-621
A. TENAGA
B. BAHAN
C. PERALATAN
IV - 233
Analisa EI-631.rob
A. TENAGA
B. BAHAN
C. PERALATAN
1. Wheel Loader E15 Jam 0.0096 477,782.58 4,573.04
2. AMP E01 Jam 0.0201 9,343,417.71 187,618.83
3. Genset E12 Jam 0.0201 353,061.25 7,089.58
4. Dump Truck (3,5 ton) E08 Jam 0.0122 261,574.70 3,192.03
5. Asphalt Finisher E02 Jam 0.0386 - 0.00
6. Tandem Roller E17 Jam 0.0317 445,867.99 14,146.25
7 P. Tyre Roller E18 Jam 0.0109 - 0.00
8 Alat Bantu Ls 1.0000 0.00 0.00
IV - 234
Analisa EI-632.rob
A. TENAGA
B. BAHAN
C. PERALATAN
1. Wheel Loader E15 Jam 0.0096 477,782.58 4,573.04
2. AMP E01 Jam 0.0201 9,343,417.71 187,618.83
3. Genset E12 Jam 0.0201 353,061.25 7,089.58
4. Dump Truck E08 Jam 0.0163 261,574.70 4,256.04
5. Asphalt Finisher E02 Jam 0.0290 - 0.00
6. Tandem Roller E17 Jam 0.0238 445,867.99 10,609.69
7 P. Tyre Roller E18 Jam 0.0082 - 0.00
8 Alat Bantu Ls 1.0000 0.00 0.00
IV - 235
Analisa EI-661
A. TENAGA
B. BAHAN
C. PERALATAN
IV - 236
Analisa EI-662
A. TENAGA
B. BAHAN
C. PERALATAN
IV - 237
Analisa EI-814
A. TENAGA
B. BAHAN
C. PERALATAN
IV - 238
Analisa EI-817
A. TENAGA
B. BAHAN
C. PERALATAN
IV - 239
Analisa EI-412
A. TENAGA
B. BAHAN
C. PERALATAN
IV - 240
Analisa EI-422
A. TENAGA
B. BAHAN
C. PERALATAN
IV - 241
Analisa EI-192a rob
A. TENAGA
B. BAHAN
C. PERALATAN
IV - 242
Analisa EI-192b rob
A. TENAGA
B. BAHAN
C. PERALATAN
IV - 243
Analisa EI-181
A. TENAGA
B. BAHAN
C. PERALATAN
IV - 244
Analisa EI-182
A. TENAGA
B. BAHAN
C. PERALATAN
IV - 245
1 m2 Memasang Paving Block t = 8 cm (K - 250)
A. TENAGA
B. BAHAN
C. PERALATAN
A. TENAGA
B. BAHAN
C. PERALATAN
IV - 246
yang dibayar dari kontrak) dan biaya-biaya lainnya.
IV - 247
Analisa EI-714
A. TENAGA
B. BAHAN
C. PERALATAN
IV - 248
Analisa EI-619
A. TENAGA
B. BAHAN
C. PERALATAN
Sumber, 2020
IV - 249
DAFTAR SATUAN ANALISA
DINAS PERUMAHAN KAWASAN PERMUKIMAN DAN PERTANAHAN
KABUPATEN CIREBON
TAHUN ANGGARAN 2017
HARGA SATUAN
NO KODE ANALISA SATUAN PEKERJAAN
Rp
Sumber, 2017
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.3088 80,000.00 24,704.00
Tukang bor L.02 OH 0.0772 110,000.00 8,492.00
Mandor L.04 OH 0.0309 120,000.00 3,708.00
JUMLAH TENAGA KERJA 36,904.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN
Driling rig + perlengkapan m 0.541 805,000.00 435,102.50
JUMLAH HARGA ALAT 435,102.50
D Jumlah (A+B+C) 472,006.50
E Overhead & Profit 15.00% 70,800.98
F Harga Satuan Pekerjaan (D+E) 542,807.48
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.3088 80,000.00 24,704.00
Tukang bor L.02 OH 0.0772 110,000.00 8,492.00
Mandor L.04 OH 0.0309 120,000.00 3,708.00
JUMLAH TENAGA KERJA 36,904.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN
Driling rig + perlengkapan m 0.541 603,750.00 326,326.88
JUMLAH HARGA ALAT 326,326.88
D Jumlah (A+B+C) 363,230.88
E Overhead & Profit 15.00% 54,484.63
F Harga Satuan Pekerjaan (D+E) 417,715.51
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.1544 80,000.00 12,352.00
Tukang bor L.02 OH 0.0386 110,000.00 4,246.00
Mandor L.04 OH 0.0155 120,000.00 1,854.00
JUMLAH TENAGA KERJA 18,452.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN
Driling rig + perlengkapan m 0.270 805,000.00 217,551.25
JUMLAH HARGA ALAT 217,551.25
D Jumlah (A+B+C) 236,003.25
E Overhead & Profit 15.00% 35,400.49
F Harga Satuan Pekerjaan (D+E) 271,403.74
V - 252
AT.03.a 1 m' Pengeboran Reaming Ø 10'' (daerah batuan keras)
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.2840 80,000.00 22,720.00
Tukang bor L.02 OH 0.0710 110,000.00 7,810.00
Mandor L.04 OH 0.0286 120,000.00 3,432.00
JUMLAH TENAGA KERJA 33,962.00
B BAHAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.2840 80,000.00 22,720.00
Tukang bor L.02 OH 0.0710 110,000.00 7,810.00
Mandor L.04 OH 0.0286 120,000.00 3,432.00
JUMLAH TENAGA KERJA 33,962.00
B BAHAN
AT.07 1 m' Pengadaan dan pemasangan konstuksi pipa cassing PVC 6''
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0720 80,000.00 5,760.00
Tukang bor L.02 OH 0.0180 110,000.00 1,980.00
Mandor L.04 OH 0.0071 120,000.00 852.00
JUMLAH TENAGA KERJA 8,592.00
B BAHAN
Pipa PVC 6'' m 1.0500 177,225.63 186,086.91
Centralizer Ls 0.1000 186,086.91 18,608.69
JUMLAH HARGA BAHAN 204,695.60
C PERALATAN
Driling rig + perlengkapan jam 0.1250 805,000.00 100,625.00
JUMLAH HARGA ALAT 100,625.00
D Jumlah (A+B+C) 313,912.60
E Overhead & Profit 15.00% 47,086.89
V - 253
F Harga Satuan Pekerjaan (D+E) 360,999.49
V - 254
AT.09 1 m' Pengadaan dan pemasangan konstuksi pipa cassing PVC 8''
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0800 80,000.00 6,400.00
Tukang bor L.02 OH 0.0200 110,000.00 2,200.00
Mandor L.04 OH 0.0082 120,000.00 984.00
JUMLAH TENAGA KERJA 9,584.00
B BAHAN
Pipa PVC 8'' m 1.0500 300,181.75 315,190.84
Centralizer Ls 0.1000 315,190.84 31,519.08
JUMLAH HARGA BAHAN 346,709.92
C PERALATAN
Driling rig + perlengkapan m 0.1429 805,000.00 115,034.50
JUMLAH HARGA ALAT 115,034.50
D Jumlah (A+B+C) 471,328.42
E Overhead & Profit 15.00% 70,699.26
F Harga Satuan Pekerjaan (D+E) 542,027.68
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.0400 80,000.00 83,200.00
Tukang bor L.02 OH 0.2600 110,000.00 28,600.00
Mandor L.04 OH 0.1040 120,000.00 12,480.00
JUMLAH TENAGA KERJA 124,280.00
B BAHAN
Gravel pack pelabuhan m3 1.0000 1,380,000.00 1,380,000.00
ratu/sukabumi
JUMLAH HARGA BAHAN 1,380,000.00
C PERALATAN
Driling rig + perlengkapan m 1.8180 805,000.00 1,463,490.00
JUMLAH HARGA ALAT 1,463,490.00
D Jumlah (A+B+C) 2,967,770.00
E Overhead & Profit 15.00% 445,165.50
F Harga Satuan Pekerjaan (D+E) 3,412,935.50
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.5720 80,000.00 45,760.00
Tukang bor L.02 OH 0.1430 110,000.00 15,730.00
Mandor L.04 OH 0.0570 120,000.00 6,840.00
JUMLAH TENAGA KERJA 68,330.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN
Driling rig + perlengkapan jam 1.0000 100,625.00 100,625.00
JUMLAH HARGA ALAT 100,625.00
D Jumlah (A+B+C) 168,955.00
E Overhead & Profit 15.00% 25,343.25
F Harga Satuan Pekerjaan (D+E) 194,298.25
V - 255
AT.14 1 jam Uji Pemompaan
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.5720 80,000.00 45,760.00
Tukang bor L.02 OH 0.1430 110,000.00 15,730.00
Mandor L.04 OH 0.0570 120,000.00 6,840.00
JUMLAH TENAGA KERJA 68,330.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN
Driling rig + perlengkapan jam 1.0000 100,625.00 100,625.00
JUMLAH HARGA ALAT 100,625.00
D Jumlah (A+B+C) 168,955.00
E Overhead & Profit 15.00% 25,343.25
F Harga Satuan Pekerjaan (D+E) 194,298.25
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
pekerja L.01 OH 1.500 80,000.00 120,000.00
mandor L.02 OH 0.050 120,000.00 6,000.00
JUMLAH TENAGA KERJA 126,000.00
1 m' Pemasangan pipa PVC dia. 350 mm melalui galian tanah berbatu / bongkar jalan
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 m' Pemasangan pipa PVC dia. 300 mm melalui galian tanah berbatu / bongkar jalan
1 m' Pemasangan pipa PVC dia. 250 mm melalui galian tanah berbatu / bongkar jalan
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
V - 256
m' Pemasangan pipa PVC dia. 250 mm 1 4,500.00 4,500.00
ls Perapihan 1 1,650.00 1,650.00
JUMLAH 188,654.77
V - 257
1 m' Pemasangan pipa PVC dia. 200 mm melalui galian tanah berbatu / bongkar jalan
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 m' Pemasangan pipa PVC dia. 160 mm melalui galian tanah berbatu / bongkar jalan
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 m' Pemasangan pipa PVC dia. 110 mm melalui galian tanah berbatu / bongkar jalan
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 m' Pemasangan pipa PVC dia. 90 mm melalui galian tanah berbatu / bongkar jalan
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 m' Pemasangan pipa PVC dia. 63 mm melalui galian tanah berbatu / bongkar jalan
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
V - 258
1 m' Pemasangan pipa PVC dia. 50 mm melalui galian tanah berbatu / bongkar jalan
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 m' Pemasangan pipa PVC dia. 350 mm melalui galian tanah keras / berbatu
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 m' Pemasangan pipa PVC dia. 300 mm melalui galian tanah keras / berbatu
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 m' Pemasangan pipa PVC dia. 250 mm melalui galian tanah keras / berbatu
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
V - 259
1 m' Pemasangan pipa PVC dia. 200 mm melalui galian tanah keras / berbatu
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 m' Pemasangan pipa PVC dia. 160 mm melalui galian tanah keras / berbatu
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 m' Pemasangan pipa PVC dia. 110 mm melalui galian tanah keras / berbatu
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 m' Pemasangan pipa PVC dia. 90 mm melalui galian tanah keras / berbatu
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 m' Pemasangan pipa PVC dia. 63 mm melalui galian tanah keras / berbatu
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
V - 260
1 m' Pemasangan pipa PVC dia. 50 mm melalui galian tanah keras / berbatu
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 m' Pemasangan pipa PVC dia. 25 mm melalui galian tanah keras / berbatu
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 m' Pemasangan pipa PVC dia. 350 mm melalui galian tanah biasa
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 m' Pemasangan pipa PVC dia. 300 mm melalui galian tanah biasa
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 m' Pemasangan pipa PVC dia. 250 mm melalui galian tanah biasa
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
V - 261
1 m' Pemasangan pipa PVC dia. 200 mm melalui galian tanah biasa
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 m' Pemasangan pipa PVC dia. 110 mm melalui galian tanah biasa
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
V - 262
1 m' Pemasangan pipa PVC dia. 50 mm melalui galian tanah biasa
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 m' Perbaikan pipa PVC dia. 350 mm melalui galian tanah berbatu / bongkar jalan
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 m' Perbaikan pipa PVC dia. 300 mm melalui galian tanah berbatu / bongkar jalan
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 m' Perbaikan pipa PVC dia. 250 mm melalui galian tanah berbatu / bongkar jalan
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
V - 263
1 m' Perbaikan pipa PVC dia. 200 mm melalui galian tanah berbatu / bongkar jalan
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 m' Perbaikan pipa PVC dia. 160 mm melalui galian tanah berbatu / bongkar jalan
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 m' Perbaikan pipa PVC dia. 110 mm melalui galian tanah berbatu / bongkar jalan
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 m' Perbaikan pipa PVC dia. 90 mm melalui galian tanah berbatu / bongkar jalan
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 m' Perbaikan pipa PVC dia. 63 mm melalui galian tanah berbatu / bongkar jalan
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
V - 264
1 m' Perbaikan pipa PVC dia. 50 mm melalui galian tanah berbatu / bongkar jalan
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 m' Perbaikan pipa PVC dia. 25 mm melalui galian tanah berbatu / bongkar jalan
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 m' Perbaikan pipa PVC dia. 350 mm melalui galian tanah keras / berbatu
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 m' Perbaikan pipa PVC dia. 300 mm melalui galian tanah keras / berbatu
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 m' Perbaikan pipa PVC dia. 250 mm melalui galian tanah keras / berbatu
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
V - 265
1 m' Perbaikan pipa PVC dia. 200 mm melalui galian tanah keras / berbatu
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 m' Perbaikan pipa PVC dia. 160 mm melalui galian tanah keras / berbatu
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 m' Perbaikan pipa PVC dia. 110 mm melalui galian tanah keras / berbatu
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 m' Perbaikan pipa PVC dia. 90 mm melalui galian tanah keras / berbatu
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 m' Perbaikan pipa PVC dia. 63 mm melalui galian tanah keras / berbatu
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
V - 266
1 m' Perbaikan pipa PVC dia. 50 mm melalui galian tanah keras / berbatu
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 m' Perbaikan pipa PVC dia. 25 mm melalui galian tanah keras / berbatu
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 m' Perbaikan pipa PVC dia. 350 mm melalui galian tanah biasa
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 m' Perbaikan pipa PVC dia. 300 mm melalui galian tanah biasa
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 m' Perbaikan pipa PVC dia. 250 mm melalui galian tanah biasa
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
V - 267
JUMLAH 243,308.84
V - 268
1 m' Perbaikan pipa PVC dia. 200 mm melalui galian tanah biasa
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 m' Perbaikan pipa PVC dia. 160 mm melalui galian tanah biasa
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 m' Perbaikan pipa PVC dia. 110 mm melalui galian tanah biasa
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
V - 269
1 m' Perbaikan pipa PVC dia. 50 mm melalui galian tanah biasa
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
V - 270
400 m' Pengetesan pipa PVC dia. 250 mm
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
V - 271
400 m' Pengetesan pipa PVC dia. 90 mm
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
V - 272
1 unit perbaikan gate valve dia. 300mm
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 unit Perbaikan gate valve dia. 160 mm melalui galian tanah berbatu / bongkar jalan
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 unit Perbaikan gate valve dia. 110 mm melalui galian tanah berbatu / bongkar jalan
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
V - 273
1 unit Perbaikan gate valve dia. 90 mm melalui galian tanah berbatu / bongkar jalan
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 unit Perbaikan gate valve dia. 63 mm melalui galian tanah berbatu / bongkar jalan
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 unit Perbaikan gate valve dia. 50 mm melalui galian tanah berbatu / bongkar jalan
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 unit Perbaikan gate valve dia. 25 mm melalui galian tanah berbatu / bongkar jalan
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
V - 274
1 unit Perbaikan gate valve dia. 160 mm melalui galian tanah keras / berbatu
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 unit Perbaikan gate valve dia. 110 mm melalui galian tanah keras / berbatu
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 unit Perbaikan gate valve dia. 90 mm melalui galian tanah keras / berbatu
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 unit Perbaikan gate valve dia. 63 mm melalui galian tanah keras / berbatu
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
V - 275
1 unit Perbaikan gate valve dia. 50 mm melalui galian tanah keras / berbatu
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 unit Perbaikan gate valve dia. 25 mm melalui galian tanah keras / berbatu
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 unit Perbaikan gate valve dia. 160 mm melalui galian tanah biasa
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 unit Perbaikan gate valve dia. 110 mm melalui galian tanah biasa
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
V - 276
1 unit Perbaikan gate valve dia. 90 mm melalui galian tanah biasa
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
V - 277
1 unit pemasangan gate valve dia. 200 mm
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 unit Pemasangan gate valve dia. 250 mm melalui galian tanah berbatu / bongkar jalan
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 unit Pemasangan gate valve dia. 160 mm melalui galian tanah berbatu / bongkar jalan
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 unit Pemasangan gate valve dia. 110 mm melalui galian tanah berbatu / bongkar jalan
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 unit Pemasangan feet kran dia. 90 mm melalui galian tanah berbatu / bongkar jalan
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
V - 278
1 unit Pemasangan feet kran dia. 63 mm melalui galian tanah berbatu / bongkar jalan
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 unit Pemasangan feet kran dia. 50 mm melalui galian tanah berbatu / bongkar jalan
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 unit Pemasangan gate valve dia. 250 mm melalui galian tanah keras / berbatu
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 unit Pemasangan gate valve dia. 160 mm melalui galian tanah keras / berbatu
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 unit Pemasangan gate valve dia. 110 mm melalui galian tanah keras / berbatu
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
V - 279
JUMLAH 389,488.87
V - 280
1 unit Pemasangan feet kran dia. 90 mm melalui galian tanah keras / berbatu
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 unit Pemasangan feet kran dia. 63 mm melalui galian tanah keras / berbatu
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 unit Pemasangan feet kran dia. 50 mm melalui galian tanah keras / berbatu
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 unit Pemasangan feet kran dia. 25 mm melalui galian tanah keras / berbatu
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 unit Pemasangan gate valve dia. 160 mm melalui galian tanah biasa
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
V - 281
1 unit Pemasangan gate valve dia. 110 mm melalui galian tanah biasa
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
V - 282
1 unit Pemasangan Box Street dia. 8"
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
V - 283
JUMLAH 38,123.41
V - 284
1 unit Peninggian Box Street
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 ls Bongkar Box Street 22,000.00
1 ls Pemasangan / Perbaikan Accessories
Accessories dia. 3/4" 75,000.00
Accessories dia. 1" 75,000.00
Accessories dia. 1 1/2" 75,000.00
Accessories dia. 2" 95,000.00
Accessories dia. 3" 99,750.00
Accessories dia. 4" 120,750.00
Accessories dia. 6" 152,250.00
Accessories dia. 8" 183,750.00
Accessories dia. 10" 238,900.00
Accessories dia. 12" 310,500.00
Accessories dia. 14" 403,600.00
1 m³ Perbaikan Aspal Hotmix 1,260,000.00
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
V - 285
1 unit Pemasangan wash out dia. 90 mm
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 unit Crossing Jalan Sistim Boring
m' pekerjaan boring tanah pipa dia. 2" 1 165,700.00
m' pekerjaan boring tanah pipa dia. 3" 1 185,100.00
m' pekerjaan boring tanah pipa dia. 4" 1 283,800.00
m' pekerjaan boring tanah pipa dia. 6" 1 335,200.00
m' pekerjaan boring tanah pipa dia. 8" 1 418,600.00
m' pekerjaan boring tanah pipa dia. 10" 1 598,300.00
m' pekerjaan boring tanah pipa dia. 12" 1 598,300.00
m' pekerjaan boring tanah pipa dia. 14" 1 672,500.00
m' pekerjaan boring tanah pipa dia. 16" 1 700,000.00
V - 286
Pemasangan Pipa Sistim Boring
18 m' Pemasangan Pipa PVC dia. 2" Sistim Boring Horizontal
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
V - 287
18 m' Pemasangan Pipa PVC dia. 8" Sistim Boring Horizontal
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
V - 288
1 m' Pemasangan pipa GI dia. 200 mm melalui galian type FR/CR
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
Sumber, 2020
V - 289
DAFTAR HARGA SATUAN BAHAN, UPAH DAN ALAT
DINAS PERUMAHAN KAWASAN PERMUKIMAN DAN PERTANAHAN
KABUPATEN CIREBON
TAHUN ANGGARAN 2020
HARGA SATUAN
NO URAIAN BAHAN/UPAH/ALAT KODE SAT. KET.
Rp
A. BAHAN :
I. BATU
1 Abu Batu m3 345,000.00
2 Atras ( tanah urug ) m3 143,750.00
3 Batu apung kg 4,945.00
4 Batu belah 10/15 cm m3 345,000.00
5 Batu belah 15/20 cm (Krakal) m3 258,750.00
6 Batu pecah mesin 0.5-1 cm m3 287,500.00
7 Batu pecah mesin 1-2 cm m3 345,000.00
8 Batu pecah mesin 2-3 cm m3 345,000.00
9 Batu pecah mesin 3-5 cm m3 345,000.00
10 Batu tempel Palimanan 10 X 20 bh 3,220.00
11 Batu tempel kapur tekstur tidak rata m2 299,000.00
12 Chipping m3 310,500.00
13 Filler m3 218,500.00
14 Kapur bakar (padam) m3 253,000.00
15 Kapur Sirih kg 2,300.00
16 Kerikil Ø 1-3 cm m3 230,000.00
17 Gravel Pack (pelabuhan ratu/sukabumi) m3 1,380,000.00
Kansteen 10 x 20 x 40 bh 15,325.00
II. PASIR
1 Pasir beton m3 244,375.00
2 Pasir aspal m3 244,375.00
3 Pasir pasang m3 222,812.50
4 Pasir urug m3 222,755.00
5 Sirtu m3 201,250.00
6 Sirtu tersaring m3 301,875.00
7 Tanah urug pilhan m3 172,500.00
8 Tanah urug biasa m3 172,500.00
9 Tanah merah m3 172,500.00
VI - 290
HARGA SATUAN
NO URAIAN BAHAN/UPAH/ALAT KODE SAT. KET.
Rp
28 Plat baja tebal 5 mm - 20 mm kg 14,950.00
29 Ram kawat harmonika m2 51,750.00
30 Socket besi O 3 " bh 51,750.00
31 Sling Ø 32 mm m 350,750.00
32 Sling Ø 16 mm m 258,750.00
VI - 291
HARGA SATUAN
NO URAIAN BAHAN/UPAH/ALAT KODE SAT. KET.
Rp
33 Klem sling Ø 32 mm set 517,500.00
34 Warfel / jarum keras Ø 32 mm bh 230,000.00
35 Causen sling Ø 32 mm bh 224,250.00
36 Klem kokat sling Ø 32 mm bh 287,500.00
37 Segel sling Ø 32 mm bh 287,500.00
38 Warfel sling Ø 16 mm bh 189,750.00
39 Segel sling Ø 16 mm bh 161,000.00
40 Klem kokat sling Ø 16 mm bh 103,500.00
41 Causen sling Ø 16 mm bh 166,750.00
42 Jarum keras Ø 16 mm bh 189,750.00
VI - 292
HARGA SATUAN
NO URAIAN BAHAN/UPAH/ALAT KODE SAT. KET.
Rp
64 Loster Jati bh 28,750.00
65 Glass beat kg 28,750.00
66 Glass Block bh 20,125.00
67 Gas elpiji kg 21,850.00
68 Grendel pintu / jendela bh 6,325.00
VI - 293
HARGA SATUAN
NO URAIAN BAHAN/UPAH/ALAT KODE SAT. KET.
Rp
69 Gypsum board lbr 60,375.00
70 GRC tebal 4 mm lbr 78,200.00
71 Fiber Gelombang 180 x80 lbr 46,000.00
72 Kaca nako tebal 5 mm berikut teralis bh 13,110.00
73 Kaca polos tebal 3 mm m2 72,737.50
74 Kaca polos tebal 5 mm m2 86,250.00
75 Kaca polos tebal 5 mm ryben m2 92,000.00
76 Kait angin bh 8,625.00
77 Kran air Onda bh 13,800.00
78 Kunci gembok bh 28,750.00
79 Kunci pintu ukuran besar bh 143,750.00
80 Kunci pintu ukuran sedang bh 97,750.00
81 Kunci dan daun pintu dari fiber bh 402,500.00
82 Kusen Alumunium 3" warna natural/silver m' 75,900.00
83 Kusen Alumunium 3" warna coklat dop m' 82,225.00
84 Kusen Alumunium 3" warna coklat kilap m' 94,875.00
85 Kusen Alumunium 4" warna natural m' 94,875.00
86 Kusen Alumunium 4" warna coklat dop m' 101,200.00
87 Kusen Alumunium 4" warna coklat kilap m' 113,850.00
88 Kusen Alumunium 3" YKK m' 115,000.00
89 Kusen Alumunium 4" YKK m' 1,495,000.00
90 Langko - langko kuda - kuda bh 20,700.00
91 Lantai granit 60 x 60 cm ex. Granito corak bh 66,930.00
92 Lantai granit 60 x 60 cm ex. Granito polos bh 66,240.00
93 Lantai granit 40 x 40 cm ex. Essenza bh 66,125.00
94 Lantai granit 40 x 40 cm ex. Granito bh 64,630.00
95 Lantai granit 60 x 60 cm ex. Granito bh 66,585.00
96 Lantai keramik uk. 10 x 20 cm bh 5,750.00
97 Lantai keramik uk. 20 x 20 cm bh 7,475.00
98 Lantai keramik uk. 30 x 30 cm bh 4,830.00
99 Lantai keramik uk. 40 x 40 cm ( putih polos ) bh 12,650.00
100 Lantai terakota 20 x 5 cm bh 11,500.00
101 Lem kayu ltr 34,500.00
102 Lemkra/zat addictive kg 17,250.00
103 Lemkra Just Do It kg 5,175.00
104 Lemkra FS Nat kg 18,227.50
105 List kayu B.3 ( lebar sisi 3 cm ) m' 5,060.00
106 List kayu B.4 ( lebar sisi 4 cm ) m' 5,520.00
107 List keliling gypsum lebar 7 cm m' 16,100.00
108 List keliling gypsum lebar 10 cm m' 18,400.00
109 List keliling gypsum lebar 12 cm m' 20,700.00
110 List drop m' 10,235.00
111 Melamin / folywood lbr 101,775.00
112 Mozaik uk. 20 x 20 cm bh 2,185.00
113 Multiplex tebal 12 mm lbr 230,000.00
114 Multiplex tebal 15 mm lbr 316,250.00
115 Paku biasa 1/2" - 1" kg 23,000.00
116 Paku biasa 2" - 5" kg 23,000.00
117 Paku pancing 60 x 230 bh 977.50
118 Paku sekrup 3" - 5 " bh 460.00
119 Paku ulir bh 172.50
120 Plamir kayu / kualitas 1 kg 23,000.00
121 Plamir tembok kg 80,500.00
122 Plester Mutiara kg 9,200.00
123 Pintu kamer mandi fiber polos Daimaru bh 201,250.00
124 Pintu kamer mandi fiber Kaca Daimaru bh 281,750.00
125 Pintu kamer mandi Almunium Kettler bh 805,000.00
126 Polycarbonate m2 132,250.00
127 Plywood lbr 106,087.50
128 Portland Cement ( PC ) tiga roda zak 81,650.00
129 Portland Cement ( PC ) holcim zak 78,200.00
130 Portland Cement ( PC ) gresik zak 78,200.00
131 Rubber joint 25x10x5 bh 287,500.00
132 Joint Sealent kg 48,300.00
133 Expansion Cap m2 8,740.00
134 Polytene 125 mikron kg 31,625.00
135 Curing Compound Ltr 14,375.00
136 Roster / batu kerawang bh 4,600.00
137 Portland Semen kg 1,633.00
138 Semen warna kg 6,900.00
139 Seng BJLS 30 L. 90 cm m' 43,700.00
140 Seng gelombang 3' - 6 " BJLS 30 lbr 92,000.00
141 Sirlak kg 22,425.00
142 Spirtus ltr 10,350.00
143 Skim Coat kg 5,060.00
VI - 294
HARGA SATUAN
NO URAIAN BAHAN/UPAH/ALAT KODE SAT. KET.
Rp
144 Taekwood 4 mm 1200 x 2400 mm lbr 92,000.00
145 Taekwood 4 mm 900 x 2400 mm lbr 74,750.00
146 Ter kayu kg 16,675.00
147 Thermoplastic Glass beat kg 28,750.00
148 Tiner / minyak cat ltr 13,225.00
VI - 295
HARGA SATUAN
NO URAIAN BAHAN/UPAH/ALAT KODE SAT. KET.
Rp
149 Triplek 3 mm lbr 64,400.00
150 Triplek 4 mm lbr 96,600.00
151 Triplek 6 mm lbr 146,050.00
152 Triplek 9 mm lbr 163,300.00
153 Triplek 12 mm lbr 188,600.00
154 Tempat cuci piring Beleza bh 460,000.00
155 Tempat cuci piring Benoti bh 201,250.00
156 Tempat cuci piring Royal bh 184,000.00
157 TG 302 kg 50,140.00
158 Washtafel bh 788,900.00
159 Woodplank corak 4 m lbr 69,000.00
160 Woodplank polos 2 m lbr 37,375.00
161 Ubin abu2 kepala basah 20 x 20 cm bh 2,300.00
162 Ubin abu2 kepala basah 30 x 30 cm bh 2,875.00
163 Ubin wafel ukuran 20 x 20 cm bh 2,300.00
164 Ubin warna 20 x 20 cm bh 2,645.00
165 Ubin warna 30 x 30 cm bh 3,335.00
166 Washtafel bh 788,900.00
167 Woodplank corak 4 m lbr 69,000.00
168 Woodplank polos 2 m lbr 37,375.00
169 Zincalume m2 86,250.00
170 Rangka plafon memakai Hollow dengan penutup GRC m2 101,430.00
tebal 4 mm + pengecatan
171 Tyfo Epoxy S Kg 747,500.00
172 Tyfo SHE51A m2 920,000.00
173 Karung plastik bh 2,875.00
V. ASPAL
1 Aspal kemasan kg 14,030.00
2 Aspal curah kg 13,800.00
3 Aspal Emulsi ltr 13,110.00
VI. MINYAK
1 Premium liter 7,532.50
2 Premium (non subsidi) liter 7,532.50
3 Solar liter 5,922.50
4 Solar (non subsidi) liter 7,072.50
5 Minyak tanah liter 11,787.50
6 Olie SAE 20, 40, 60, 80 dan 120 liter 48,300.00
7 Pelumas bekisting liter 11,500.00
8 Stempet kg 28,750.00
VII.CETAKAN
1 Bata merah bh 900.00
2 Bata berongga bh 2,800.00
3 Batako bh 3,680.00
4 Genteng glazuur turbo ex Jatiwangi bh 4,025.00
5 Genteng nok/bubung diglazuur ex Jatiwangi bh 4,600.00
6 Genteng nok/bubung press mesin ex Jatiwangi bh 2,875.00
7 Genteng nok/bubung press tangan ex Jatiwangi bh 2,300.00
8 Genteng nok/bubung morando diglazuur bh 5,175.00
9 Genteng morando bh 4,025.00
VI - 296
HARGA SATUAN
NO URAIAN BAHAN/UPAH/ALAT KODE SAT. KET.
Rp
10 Genteng nok/bubung morando bh 4,600.00
11 Genteng press diglazuur ex Jatiwangi bh 2,875.00
12 Genteng press mesin ex Jatiwangi bh 2,185.00
13 Genteng press tangan ex Jatiwangi bh 1,610.00
14 Genteng Type Viktoria bh 10,350.00
VI - 297
HARGA SATUAN
NO URAIAN BAHAN/UPAH/ALAT KODE SAT. KET.
Rp
15 Genteng nok/bubung Type Viktoria bh 14,375.00
16 Genteng nok/bubung ujung Type Viktoria bh 23,000.00
17 Genteng nok/bubung ujung pertigaan Type Viktoria bh 28,750.00
18 Genteng beton bh 5,750.00
19 Genteng metal 70 x 80 cm lbr 55,200.00
20 Gorong-gorong buis beton dia. 150 cm bh/0,5 m' 598,000.00
21 Gorong-gorong buis beton dia. 100 cm bh/0,5 m' 172,500.00
22 Gorong-gorong buis beton dia. 80 cm bh/0,5 m' 161,000.00
23 Gorong-gorong buis beton dia. 60 cm bh/m' 149,500.00
24 Gorong-gorong buis beton dia. 50 cm bh/m' 143,750.00
25 Gorong-gorong buis beton dia. 40 cm bh/m' 138,000.00
26 Gorong-gorong buis beton dia. 30 cm bh/m' 92,000.00
27 Gorong-gorong buis beton dia. 20 cm bh/m' 69,000.00
28 Kansten Cetak bh 94,875.00
29 Gravel dia. 60 cm bh 86,250.00
30 Gravel dia. 40 cm bh 51,750.00
31 Gravel dia. 20 cm bh 40,250.00
32 Nok steel gelombang 1050 x 5 mm m' 33,350.00
33 Nok steel gelombang 920 x 5 mm m' 25,875.00
34 Nok / bubung genteng beton bh 6,900.00
35 Paving Block K.175 Netural tebal 8 cm m2 71,300.00
36 Paving Block K.175 motif tebal 8 cm m2 73,600.00
37 Paving Block K.175 warna tebal 8 cm m2 79,350.00
38 Paving Block K.175 Netural tebal 6 cm m2 57,500.00
39 Paving Block K.175 motif tebal 6 cm m2 60,950.00
40 Paving Block K.175 warna tebal 6 cm m2 65,550.00
41 Paving Block K.250 m2 82,150.00
42 Box Culvert Ukuran 400 x 400 x1200 Buah 1,534,100.00
43 Box Culvert Ukuran 500 x 500 x1200 Buah 1,927,055.00
44 Box Culvert Ukuran 600 x 600 x1200 Buah 2,425,350.00
45 U- Ditch Ukuran 300 x 300 x 1200 Buah 386,745.00
46 U- Ditch Ukuran 300 x 400 x 1200 Buah 436,195.00
47 U- Ditch Ukuran 300 x 500 x 1200 Buah 513,360.00
48 U- Ditch Ukuran 400 x 400 x 1200 Buah 517,960.00
49 U- Ditch Ukuran 400 x 500 x 1200 Buah 636,180.00
50 U- Ditch Ukuran 400 x 600 x 1200 Buah 717,255.00
51 U- Ditch Ukuran 500 x 500 x 1200 Buah 807,185.00
52 U- Ditch Ukuran 500 x 600 x 1200 Buah 912,295.00
53 Cover U - Ditch 300, Heavy Duty Ukuran 300 x 600 Buah 138,000.00
54 Cover U - Ditch 400, Heavy Duty Ukuran 400 x 600 Buah 172,500.00
55 Cover U - Ditch 500, Heavy Duty Ukuran 500 x 600 Buah 220,800.00
56 Tiang pancang beton Pratekan m3 5,290,000.00
57 Beton Ready Mix K-225 m3 1,044,660.22
58 Karung Goni bh 5,625.00
VIII. KAYU
1 Bambu Ø6 - Ø8 / 6 m btg 19,550.00
2 Kayu deplank 8/20 - 4 m (Jati Jateng) m3 18,400,000.00
3 Kayu deplank 8/20 - 4 m (Balau) m3 13,800,000.00
4 Kayu deplank 8/20 - 4 m (Borneo) m3 5,175,000.00
5 Kayu dolken O 8 - 10 /4 m btg 74,750.00
6 Kayu dolken O 12 - 15 /4 m btg 86,250.00
7 Kayu dolken O 5 /3 m btg 15,065.00
8 Kayu hutan/kayu perancah acuan (kayu kelas III) m3 4,025,000.00
9 Kayu kamper m3 9,430,000.00
10 Kayu kaso 5/7 meranti m3 5,750,000.00
11 Kayu kaso 5/7 meranti btg 90,850.00
12 Kayu kruing m3 8,365,100.00
13 Kayu lanan m3 7,527,900.00
14 Kayu meranti m3 6,900,000.00
15 Kayu jati Jabar m3 9,430,000.00
16 Kayu Balau (kayu kelas I) m3 10,925,000.00
17 Kayu Borneo (kayu kelas II) m3 5,750,000.00
18 Kayu bakar m3 172,500.00
19 Reng kayu borneo ukuran 2/3 cm btg 19,550.00 0.0024
20 Reng 2 x 3 cm btg 40,250.00
21 Tali Ijuk kg 20,700.00 331,200.00
IX. LAIN-LAIN
1 Air L 75.00 (10 m3 air PDAM
2 Air bersih m3 5,750.00
3 Kayu kelas III (0,03 * 0,02 * 2 * 0,8)* harga bahan per m3 kg 38,640.00
4 Jendela naco (0,04 * harga kaca) bh 3,450.00
5 seng pelat (asumsi L.90 P.1 m) lbr 43,700.00
6 kawat jaring lbr 653,738.20
VI - 298
HARGA SATUAN
NO URAIAN BAHAN/UPAH/ALAT KODE SAT. KET.
Rp
7 panel beton pracetak lbr 118,450.00
8 kolom beton pracetak batang 201,250.00
9 bahan tambahan kimia (efoksi) Liter 155,250.00
10 Strorox – 100 kg 87,975.00
11 Waterstop lebar 150 mm m' 57,500.00
VI - 299
HARGA SATUAN
NO URAIAN BAHAN/UPAH/ALAT KODE SAT. KET.
Rp
12 Waterstop lebar 200 mm m' 143,750.00
13 Waterstop lebar 230 mm - 320 mm m' 132,250.00
14 Jaring kawat baja dilas (1 lembar = 61,79 kg)untuk wiremesh M8 kg 10,580.00
15 Penjaga jarak bekisting/spacer (dari besi/baut) bh 20,700.00
16 Besi scuare tube m' 21,850.00
17 Besi lis kaca (1 x 1) cm m' 16,445.00
18 Pengelasan cm 5,060.00
20 Besi hollow (50 x 50 x 3) mm kg 8,625.00
21 Dinabolt Ø 12mm bh 2,990.00
22 Phenol film 12 mm lbr 281,750.00
23 Semen grout kg 2,760.00 setara MU 800 =
24 Screening kg 172.50 harga /m3 = Rp.
25 Besi siku L 30.30.3 kg 12,075.00
26 Besi pelat baja kg 7,475.00
27 Kawat las kg 31,050.00
28 Pintu gulung besi m2 1,122,400.00
29 Pintu lipat m2 3,116,500.00
30 Rolling door alluminium m2 460,000.00
31 Profil alluminium (silver) m' 126,500.00
32 Sealant tube 23,000.00
33 Venetions blinds dan vertical blinds (tirai) m2 122,130.00
34 Profil kaca (allumunium) m' 14,260.00
35 Sunscreen alluminium m2 442,750.00
36 Kawat nyamuk m2 287,500.00
37 Baja strip (0,2 x 2) cm kg 20,872.50
38 Jendela nako (rangka + kaca 5 mm) m2 187,680.00
39 Rangka metal hollow 40.40.2 mm m' 21,850.00
40 Baja ringan canai dingin C75 kg 16,100.00
41 HB (Batako Berlobang)-20 m3 503,125.00
42 HB (Batako Berlobang)-15 m3 575,000.00
43 HB (Batako Berlobang)-10 m3 776,250.00
44 Besi angker diameter 8 kg 14,950.00
45 Bata ringan tebal 7,5cm m3 747,500.00
46 Bata ringan tebal 10cm m3 862,500.00
47 Mortar siap pakai kg 4,312.50
48 Semen Mortar (SM) m3 1,092.50
49 Batu granit kg 5,750.00
50 Batu traso kg 5,750.00
80 ubin keramik mozaik ukuran 30 cm x 30 cm bh 4,600.00
81 plint keramik ukuran 10 cm x 20 cm bh 13,800.00
82 plint keramik ukuran 10 cm x 10 cm bh 10,350.00
83 plint keramik ukuran 5 cm x 20 cm bh 10,350.00
84 plint internal cove artistik 5 cm x 5 cm x 20 cm bh 17,250.00
85 lantai marmer ukuran 100cm x 100cm bh 920,000.00
86 Karpet m2 115,000.00
87 Lem untuk karpet kg 78,775.00
88 underlayer (pelapis bawah karpet) m2 57,500.00
89 parquet kayu m2 172,500.00
91 dinding keramik artistik 10 cm x 20 cm bh 3,910.00
92 dinding keramik artistik 5 cm x 20 cm bh 1,955.00
93 dinding marmer 100 cm x 100 cm bh 920,000.00
94 bata pelapis 3 cm x 7 cm x 24 cm bh 4,715.00
95 batu paras bh 4,830.00
96 batu tempel hitam bh 1,782.50
97 Vynil bh 12,650.00
98 Lem vynil kg 25,300.00
99 Wallpaper m' 80,500.00
100 Floor harderner kg 11,155.00
101 Asbes semen m2 42,550.00
102 Akustik lbr 58,650.00
103 Profil Allum "T" m' 113,850.00
104 Ramset bh 230.00
105 Rooflight 90 x 180 lbr 71,300.00
106 Bubung stel gelombang lbr 71,300.00
107 Nok paten 92 cm lbr 71,300.00
109 Sirap kayu bh 1,897.50
110 Aluminium gel tebal 0,55 lbr 156,400.00
113 Kunci tanam antik (belluci) bh 255,300.00
114 Kunci tanam KM bh 51,750.00
115 Kunci silinder bh 80,500.00
116 Engsel kupu-kupu bh 28,750.00
117 Engsel angin bh 23,000.00
118 Spring knip bh 25,300.00
119 Door closer set 322,000.00
120 Kunci slot bh 13,800.00
VI - 300
HARGA SATUAN
NO URAIAN BAHAN/UPAH/ALAT KODE SAT. KET.
Rp
121 Door holder bh 26,450.00
122 Door stop bh 46,000.00
123 Rel pintu sorong set 402,500.00
124 Kunci lemari set 163,300.00
125 Kaca tebal 8 mm m2 172,500.00
VI - 301
HARGA SATUAN
NO URAIAN BAHAN/UPAH/ALAT KODE SAT. KET.
Rp
126 Kaca buram 12 mm m2 414,575.00
127 Kaca cermin 5 mm m2 155,250.00
128 Kaca cermin 8 mm m2 296,355.00
129 Kaca wireglassed 5 mm m2 241,500.00
130 Kaca patri 5mm m2 2,300,000.00
131 Soda api kg 28,750.00
132 Sabun kg 12,650.00
133 Kuas bh 13,800.00
134 Pengencer kg 27,600.00
135 Teak oil ltr 34,787.50
136 Politur ltr 43,642.50
137 Politur jadi ltr 49,565.00
138 Residu atau ter ltr 31,625.00
139 Vernis ltr 39,847.50
140 Kalkarium kg 21,275.00
141 Alang-alang ikat 11,500.00
142 Cat antara kg 40,250.00
143 Wood filler kg 29,900.00
144 Woodstain kg 54,050.00
145 Sanding kg 55,200.00
146 Melamic kg 50,025.00
147 Urinoir unit 746,350.00
150 Baja tulangan kg 20,872.50
151 Kayu bekisting m2 40,250.00
152 Waterdrain bh 442,750.00
153 Floor drain unit 94,875.00
154 genteng palentong kecil bh 1,035.00
155 genteng kodok glazuur bh 1,610.00
156 genteng palentong besar/super bh 1,725.00
157 genteng bubung palentong besar bh 6,900.00
158 Nok genteng beton bh 4,600.00
159 Nok genteng metal bh 51,060.00
160 Pipa listrik 5/8” btg 5,750.00
161 Kabel 1,5 x 2 m 9,200.00
162 Kabel 1,5 x 3 m 13,800.00
163 Kabel 2,5 x 2 m 14,950.00
164 Kabel 2,5 x 3 m 17,250.00
165 T Dus bh 2,300.00
166 L Bow bh 2,300.00
167 Las Dop bh 3,450.00
168 Mongkok bh 1,150.00
169 Saklar tunggal bh 14,950.00
170 Saklar ganda bh 18,400.00
171 Fitting tempel bh 5,175.00
172 Fitting gantung bh 4,025.00
173 M C B bh 34,500.00
174 digital print m' 28,750.00
175 Lampu pijar 25 s/d 100 watt (phlips) bh 13,800.00
176 Lampu Sl philip 18 watt bh 41,400.00
177 Lampu Sl philip 25 watt bh 54,050.00
178 Downlight + SL 25 watt philip bh 88,550.00
179 Lampu taman + tiang + lampu 1 buah bh 287,500.00
180 Stop kontak broco standard bh 14,950.00
181 kawat arde m 12,650.00
182 over spaneng m 10,350.00
183 arde btg 12,650.00
184 box sikring bh 46,000.00
185 box MCB bh 5,750.00
186 Holo 4/4 meni btg 13,915.00
187 Holo 2/4 meni btg 12,650.00
188 Kawat Bwg 12 kg 11,500.00
189 Paku screw 2.5 cm bh 57.50
190 Adhesive kg 6,900.00
191 Kain kasa m' 460.00
192 Cat penutup 2 kali kg 28,750.00
193 Paku beton bh 201.25
VI - 302
HARGA SATUAN
NO URAIAN BAHAN/UPAH/ALAT KODE SAT. KET.
Rp
194 Kabel Listrik NYA 3 x 2,5 mm m' 7,475.00
195 Bata berongga expose bh 2,990.00
196 Atap Selulosa uk. 195 x 96 cm bh 172,500.00
197 Paku/screw atap selulosa bh 1,380.00
VI - 303
HARGA SATUAN
NO URAIAN BAHAN/UPAH/ALAT KODE SAT. KET.
Rp
198 Nok/bubung untuk atap selulosa untuk uk. 106 x 40 cm bh 94,875.00
199 Atap Selulosa uk. 106 x 40 cm bh 58,075.00
200 Nok/Bubung untuk Atap Selulosa 195 x 96 cm bh 101,200.00
201 Tabung Gas kg 21,850.00
202 Atap Bitumen Bergelombang Monolayer 3 mm LBR 189,175.00
VI - 304
HARGA SATUAN
NO URAIAN BAHAN/UPAH/ALAT KODE SAT. KET.
Rp
36 Pipa HDPE PN 12,5 dia. 3" m' 132,338.50
37 Pipa HDPE PN 12,5 dia. 4" m' 195,886.00
38 Pipa HDPE PN 12,5 dia. 5" m' 253,266.00
VI - 305
HARGA SATUAN
NO URAIAN BAHAN/UPAH/ALAT KODE SAT. KET.
Rp
39 Pipa HDPE PN 12,5 dia. 6" m' 414,080.00
40 Pipa HDPE PN 12,5 dia. 8" m' 645,100.00
41 Pipa HDPE PN 12,5 dia. 10" m' 963,127.50
42 Pipa PVC Air limbah dia. 1 1/2" m' 35,781.25
43 Pipa PVC Air limbah dia. 2" m' 45,958.33
44 Pipa PVC Air limbah dia. 2 1/2" m' 55,325.00
45 Pipa PVC Air limbah dia. 3" m' 65,672.22
46 Pipa PVC Air limbah dia. 4" m' 78,180.56
47 Pipa PVC Air limbah dia. 6" m' 144,997.22
48 Pipa PVC Air limbah dia. 8" m' 222,355.56
49 Tangki Air kav.0,8 m3 bh 2,900,000.00
50 Tangki Air kav.1 m3 bh 3,500,000.00
51 Tangki Air kav.1,5 m3 bh 5,750,000.00
52 Tangki Air kav.2 m3 bh 7,200,000.00
53 Tangki Air kav.3 m3 bh 11,000,000.00
54 Tangki Air kav.5 m3 bh 18,000,000.00
55 Tangki Air kav.10 m3 bh 40,000,000.00
56 Tangki Air kav.15 m3 bh 62,000,000.00
57 Tangki Air Tanam kav.0,8 m3 bh 3,200,000.00
58 Tangki Air Tanam kav.1 m3 bh 4,150,000.00
59 Tangki Air Tanam kav.1,5 m3 bh 6,300,000.00
60 Tangki Air Tanam kav.2 m3 bh 8,550,000.00
61 Tangki Air Tanam kav.3 m3 bh 13,500,000.00
62 Tangki Air Tanam kav.5 m3 bh 21,000,000.00
63 Tangki Air Tanam kav.10 m3 bh 45,000,000.00
64 Pipa tanah Ǿ 20 cm bh 173,200.00
65 pipa tanah diameter 15 cm bh 113,200.00
66 pipa beton diameter 15 – 20 cm bh 44,300.00
67 pipa beton diameter 30 – 100 cm bh 66,000.00
68 Septic Tank Bio kav. 4 - 5 org bh 3,770,000.00
69 Septic Tank Bio kav. 6 - 8 org bh 6,466,666.67
70 Septic Tank Bio kav. 10 - 12 org bh 9,633,333.33
71 Septic Tank Bio kav. 12 - 14 org bh 12,641,666.67
72 Septic Tank Bio kav. 40 - 50 org bh 62,000,000.00
73 Septic Tank Bio kav. 50 - 70 org bh 94,083,333.33
74 Septic Tank Bio kav. 80 - 100 org bh 126,000,000.00
75 Septic Tank Bio kav. 110 - 120 org bh 157,250,000.00
76 Septic Tank Bio kav. 130 - 150 org bh 189,000,000.00
77 Boch Gal.dia.1/2" bh 15,971.25
78 Boch Gal.dia.3/4" bh 22,730.00
79 Boch Gal.dia.1" bh 31,693.75
80 Boch Gal.dia.1 1/2" bh 72,703.75
81 Boch Gal.dia. 2" bh 162,265.00
82 Boch Gal.dia. 2 1/2" bh 261,271.25
83 Boch Gal.dia. 3" bh 355,131.25
84 Tee Gal.dia.1/2" bh 13,357.50
85 Tee Gal.dia.3/4" bh 18,327.50
86 Tee Gal.dia.1" bh 22,890.00
87 Tee Gal.dia.1 1/2" bh 42,145.00
88 Tee Gal.dia. 2" bh 55,140.00
89 Tee Gal.dia. 2 1/2" bh 111,347.50
90 Tee Gal.dia. 3" bh 173,282.50
91 Double neplee Gal.dia.1/2" bh 11,860.00
92 Double neplee Gal.dia.3/4" bh 19,241.67
93 Double neplee Gal.dia.1" bh 30,566.67
94 Double neplee Gal.dia.1 1/2" bh 59,991.67
95 Double neplee Gal.dia. 2" bh 81,345.83
96 Double neplee Gal.dia. 2 1/2" bh 79,952.50
97 Double neplee Gal.dia. 3" bh 146,130.00
98 Water mur Gal.dia.1/2" bh 28,861.25
VI - 306
HARGA SATUAN
NO URAIAN BAHAN/UPAH/ALAT KODE SAT. KET.
Rp
99 Water mur Gal.dia.3/4" bh 39,795.00
100 Water mur Gal.dia.1" bh 47,551.25
101 Water mur Gal.dia.1 1/2" bh 93,348.75
VI - 307
HARGA SATUAN
NO URAIAN BAHAN/UPAH/ALAT KODE SAT. KET.
Rp
102 Water mur Gal.dia. 2" bh 122,720.00
103 Water mur Gal.dia. 2 1/2" bh 190,045.00
104 Water mur Gal.dia. 3" bh 281,580.00
105 Dop Gal.dia.1/2" bh 7,310.00
106 Dop Gal.dia.3/4" bh 9,395.00
107 Dop Gal.dia.1" bh 14,590.00
108 Dop Gal.dia.1 1/2" bh 23,197.50
109 Dop Gal.dia. 2" bh 37,961.25
110 Dop Gal.dia. 2 1/2" bh 55,092.50
111 Dop Gal.dia. 3" bh 84,313.75
112 Socket Gal.dia.1/2" bh 6,842.50
113 Socket Gal.dia.3/4" bh 8,110.00
114 Socket Gal.dia.1" bh 13,753.75
115 Socket Gal.dia.1 1/2" bh 25,578.75
116 Socket Gal.dia. 2" bh 38,026.25
117 Socket Gal.dia. 2 1/2" bh 53,178.75
118 Socket Gal.dia. 3" bh 88,077.50
119 Knee Gal.dia.1/2" x 90 bh 8,377.50
120 Knee Gal.dia.3/4" x 90 bh 14,425.00
121 Knee Gal.dia.1" x 90 bh 18,878.75
122 Knee Gal.dia.2" x 90 bh 42,292.50
123 Knee Gal.dia. 2" x 45 bh 51,305.00
124 Knee Gal.dia. 3" x 90 bh 126,802.50
125 Knee Gal.dia. 3" x 45 bh 141,578.75
126 Gate Valve dia.1/2" bh 75,111.25
127 Gate Valve dia.3/4" bh 114,773.75
128 Gate Valve dia.1" bh 172,395.00
129 Gate Valve dia.1 1/2" bh 335,310.00
130 Gate Valve dia.2" bh 1,016,451.67
131 Gate Valve dia.3" bh 1,910,677.50
132 Gate Valve dia.4" bh 2,666,833.33
133 Check Valve dia.1/2" bh 91,412.50
134 Check Valve dia.3/4" bh 121,529.17
135 Check Valve dia.1" bh 196,180.20
136 Check Valve dia.1 1/2" bh 402,991.67
137 Check Valve dia.2" bh 618,876.67
138 Check Valve dia.3" bh 1,927,000.00
139 Check Valve dia.4" bh 3,855,750.00
140 Ball Valve dia.1/2" bh 121,727.50
141 Ball Valve dia.3/4" bh 149,114.17
142 Ball Valve dia.1" bh 220,076.67
143 Ball Valve dia.2" bh 661,766.67
144 Ball Valve dia.3" bh 1,938,308.33
145 Plug krant dia.1/2" bh 80,640.00
146 Plug krant dia.3/4" bh 124,466.67
147 Plug krant dia.1" bh 174,900.00
148 Atap kran/Bibcok 1/2" bh 34,498.33
149 Atap kran/Bibcok 3/4" bh 60,825.00
150 Seal Tape bh 4,200.00
151 Water meter dia.1/2" bh 570,620.00
152 Water meter dia.3/4" bh 1,214,000.00
153 Water meter dia.1" bh 3,146,886.67
154 Water meter dia.1 1/2" bh 5,686,748.75
155 Water meter dia.2" bh 6,926,259.17
156 Water meter dia.3" bh 6,019,930.00
157 Box meter bh 74,392.50
158 Clam sadel 2 x 1/2" bh 38,505.10
159 Clam sadel 2 x 3/4" bh 39,841.98
160 Clam sadel 2 x 1" bh 42,459.58
161 Clam sadel 3 x 1/2" bh 53,269.58
VI - 308
HARGA SATUAN
NO URAIAN BAHAN/UPAH/ALAT KODE SAT. KET.
Rp
162 Clam sadel 3 x 3/4" bh 53,269.58
163 Clam sadel 3 x 1" bh 59,052.17
164 Tee all flang 2" x 2" bh 425,700.00
VI - 309
HARGA SATUAN
NO URAIAN BAHAN/UPAH/ALAT KODE SAT. KET.
Rp
165 Tee all flang 3" x 2" bh 720,720.00
166 Tee all flang 3" x 3" bh 817,740.00
167 Tee all flang 4" x 2" bh 900,900.00
168 Tee all flang 4" x 3" bh 956,340.00
169 Tee all flang 4" x 4" bh 970,200.00
170 Bend all flang 2" x 90 bh 462,000.00
171 Bend all flang 2" x 45 bh 462,000.00
172 Bend all flang 3" x 90 bh 630,300.00
173 Bend all flang 3" x 45 bh 606,650.00
174 Bend all flang 4" x 90 bh 762,300.00
175 Bend all flang 4" x 45 bh 745,250.00
176 Gibol joint 2" bh 197,610.67
177 Gibol joint 2 1/2" bh 142,416.00
178 Gibol joint 3" bh 234,247.33
179 Gibol joint 4" bh 345,697.67
180 Flange Las 2" bh 78,786.67
181 Flange Las 3" bh 110,022.42
182 Flange Las 4" bh 189,441.25
183 Flange Las 6" bh 458,203.33
184 Baut & mur 5/8 x 3 bh 11,990.00
185 Baut & mur 5/8 x 4 bh 14,190.00
186 Baut & mur 5/8 x 5 bh 14,575.00
187 Baut & mur 5/8 x 6 bh 15,950.00
188 Manhole (Kotak/bulat) Uk.30 T.7mm bh 1,133,333.33
189 Manhole (Kotak/bulat) Uk.50 T.7mm bh 1,266,666.67
190 Manhole (Kotak/bulat) Uk.70 T.7mm bh 1,366,666.67
191 Pompa Submersible 1,5 KW-2HP 380 V Set 15,590,252.00
192 Pompa Submersible 2,2 KW-3HP 380 V Set 17,876,000.00
193 Pompa Submersible 3,0 KW-4HP 380 V Set 20,658,324.00
194 Pompa Submersible 4,0 KW-5,5HP 380 V Set 28,386,173.50
195 Panel pompa Set 5,000,000.00
196 Pemasangan Box Street dia. 8" bh 5,500.00
B. UPAH
1 Mandor /hari 120,000.00 17,142.86
2 Kepala tukang /hari 120,000.00 17,142.86
3 Tukang kayu / besi /hari 110,000.00 15,714.29
4 Tukang batu /hari 110,000.00 15,714.29
5 Tukang bor /hari 110,000.00 15,714.29
6 Tukang Las /hari 120,000.00 17,142.86
7 Pembantu tukang/Pekerja /hari 80,000.00 11,428.57
8 Operator terlatih /hari 140,000.00 20,000.00
9 Operator kurang terlatih /hari 85,000.00 12,142.86
10 Pembantu operator /hari 80,000.00 11,428.57
11 Supir truk /hari 90,000.00 12,857.14
12 Pembantu supir /hari 80,000.00 11,428.57
13 Mekanik /hari 90,000.00 12,857.14
14 Pembantu mekanik /hari 80,000.00 11,428.57
15 Buruh lapangan terlatih /hari 100,000.00 14,285.71
16 Buruh lapangan kurang terlatih /hari 80,000.00 11,428.57
17 Buruh lapangan tak terlatih / pekerja /hari 80,000.00 11,428.57
C. ALAT
1 Sewa crane (10 Ton) unit/hari 4,485,000.00
2 Sewa pipe support buah/hari 341,550.00
3 Sewa scaffolding unit/hari 341,550.00
4 Sewa Tripot/Tackel & handle crane 2 T unit/hari 4,025,000.00
5 Sewa excavator type 225 kapasitas 0,5 - 1,0 m3 unit/hari 1,835,400.00
6 Peralatan potong pipa T1/manual (gergaji) /saw unit/hari 57,500.00
7 Peralatan potong pipa T2/manual (gergaji) /saw unit/hari 57,500.00
8 Mobile crane £ 3 ton unit/hari 1,667,500.00
9 Sewa Genset 1500 watt unit/hari 1,420,020.00
10 Sewa Pompa Submersible 3 m3/h unit/hari 379,500.00
11 Sewa crane (3 Ton) Jam 132,250.00
VI - 310
HARGA SATUAN
NO URAIAN BAHAN/UPAH/ALAT KODE SAT. KET.
Rp
12 Compressor Jam 78,556.50
13 Driling rig + perlengkapan (daerah batuan keras) m 805,000.00 100,625.00
14 Driling rig + perlengkapan (daerah batuan sedang) m 603,750.00
15 Mesin Las Jam 230,000.00
16 Mesin Blower Jam 345,000.00
VI - 311
HARGA SATUAN
NO URAIAN BAHAN/UPAH/ALAT KODE SAT. KET.
Rp
ALAT JALAN
1 EXCAVATOR 80-140 HP E10 Jam 432,395.76
2 DUMP TRUCK 3.5 TON E08 Jam 261,574.70
3 WHEEL LOADER 1.0-1.6 M3 E15 Jam 477,782.58
4 MOTOR GRADER >100 HP E13 Jam 442,856.52
5 VIBRATORY ROLLER 5-8 T. E19 Jam 282,396.73
6 WATER TANKER 3000-4500 L. E23 Jam 362,404.86
7 TANDEM ROLLER 6-8 T. E17 Jam 445,867.99
8 ASPHALT DISTRIBUTOR E41 Jam 418,424.11
9 COMPRESSOR 4000-6500 L\M E05 Jam 168,688.05
10 TIRE ROLLER 8-10 T. E18 Jam 489,172.15
11 ASPHALT MIXING PLANT E01 Jam 9,343,417.71
12 GENERATOR SET E12 Jam 353,061.25
13 ASPHALT FINISHER E02 Jam 311,844.07
14 DUMP TRUCK 5 TON E09 Jam 402,962.24
15 THREE WHEEL ROLLER 6-8 T E16 Jam 252,193.22
16 ASPHALT SPRAYER E03 Jam 142,633.79
17 Beton Mixer E06 Jam 105,863.51
18 Concrete Vibrator E20 Jam 70,246.91
19 Flat Bed Truck E11 Jam 477,880.80
Sumber, 2020
VI - 312
HARGA PERKIRAAN SENDIRI (HPS)
RENCANA BIAYA : PEMBANGUNAN / REHABILITASI
TAHUN : 2020
DESA :
KECAMATAN :
KABUPATEN : C I R E B O N
HARGA
JUMLAH
NO JENIS PEKERJAAN ANALISA VOLUME SATUAN
Rp Rp
1 2 3 4 5 6
I PEKERJAAN PERSIAPAN
1 (K3) Pembuatan 1 m2 gudang semen dan peralatan A. 2.2.1.7. m2 -
2 Pengukuran dan pemasangan 1 m’ Bouwplank A. 2.2.1.4. m' -
3 (K3) Pembuatan 1 m2 steger/perancah dari bambu A. 2.2.1.10. m2 -
4 Papan nama proyek SNI.100.03 bh -
-
II PEKERJAAN BONGKARAN
1 Pembongkaran 1 m3 beton bertulang A. 2.2.1.13. m3 -
2 Pembongkaran 1 m3 dinding tembok bata A. 2.2.1.14. m3 -
-
IV PEKERJAAN PONDASI
1 Pengurugan 1 m3 dengan pasir urug A.2.3.1.11. m3 -
2 (K3) Pemasangan 1 m3 batu kosong (anstamping) A.3.2.1.9. m3 -
3 Pemasangan 1 m3 pondasi batu belah campuran 1SP : 5PP A.3.2.1.3 m3 -
-
V PEKERJAAN BETON/PEMBESIAN
1 Pembesian 10 kg dengan besi polos atau besi ulir A.4.1.1.17 kg -
2 (K3) Pemasangan 1 m2 bekisting untuk pondasi A.4.1.1.20 m2 -
3 (K3) Pemasangan 1 m2 bekisting untuk sloof A.4.1.1.21 m2 -
4 (K3) Pemasangan 1 m2 bekisting untuk kolom A.4.1.1.22 m2 -
5 (K3) Pemasangan 1 m2 bekisting untuk balok A.4.1.1.23 m2 -
6 (K3) Pemasangan 1 m2 bekisting untuk lantai A.4.1.1.24 m2 -
7 (K3) Pemasangan 1 m2 bekisting untuk dinding A.4.1.1.25 m2 -
8 (K3) Pemasangan 1 m2 bekisting untuk tangga A.4.1.1.26 m2 -
Membuat 1 m3 beton mutu f’c = 7,4 Mpa (sama dengan K 100),
9 A.4.1.1.1 m3
setara dengan beton rabat -
10 Membuat 1 m3 beton mutu f’c = 9,8 Mpa (sama dengan K-125) A.4.1.1.2 m3 -
11 Membuat 1 m3 beton mutu f’c = 12,2 Mpa (sama denga K 150) A.4.1.1.3 m3 -
Membuat 1 m3 lantai kerja beton mutu f’c = 7,4 MPa slump (3-6)
12 A.4.1.1.4 m3
cm, w/c = 0,87 -
Membuat 1 m3 beton mutu f’c = 14,5 MPa, slump (120 ± 20) mm
13 A.4.1.1.5. m3
(sama dengan K 175) -
14 Membuat 1 m3 beton mutu f’c = 16,9 Mpa (sama dengan K 220) A.4.1.1.6 m3 -
15 Membuat 1 m3 beton mutu f’c = 19,3 Mpa (sama dengan K 225) A.4.1.1.7. m3 -
16 Membuat 1 m3 beton mutu f’c = 21,7 Mpa (sama dengan K 250) A.4.1.1.8. m3 -
17 Membuat 1 m3 beton mutu f’c = 24,0 Mpa (sama dengan K 325) A.4.1.1.9. m3 -
VII - 313
18 Membuat 1 m3 beton mutu f’c = 26,4 Mpa (sama dengan K 350) A.4.1.1.10. m3 -
19 Membuat 1 m3 beton mutu f’c = 28,8 Mpa (sama dengan K 375) A.4.1.1.11. m3 -
Membuat 1 m3 beton mutu f’c = 31,2 MPa, slump (120 ± 20) mm
20 A.4.1.1.12. m3
(sama dengan K 425) -
21 Membuat 1 m3 beton kedap air dengan strorox – 100 A.4.1.1.13 m3 -
22 Membuat 1 m’ kolom praktis beton bertulang (11 x 11) cm A.4.1.1.35 m' -
23 Membuat 1 m’ ring balok beton bertulang (10 x 15) cm A.4.1.1.36 m' -
-
VII - 314
Pemasangan 1 m’ lisplank ukuran (3 x 30) cm, kayu kelas I atau
8 A.4.6.1.22. m'
kelas II -
Pemasangan 1 m2 rangka dinding pemisah (60 x 120) cm kayu
9 A.4.6.1.23. m2
kelas II atau III -
10 Pemasangan 1 m2 dinding lambrisering dari papan kayu kelas I A.4.6.1.26. m2 -
11 Pemasangan 1 m2 atap genteng palentong kecil A.4.5.2.1. m2 -
12 Pemasangan 1 m2 atap genteng palentong besar/super A.4.5.2.3. m2 -
13 Pemasangan 1 m’ bubung genteng palentong A.4.5.2.4. m' -
14 Pemasangan 1 m’ bubung genteng palentong besar A.4.5.2.6. m' -
Pemasangan 1 m’ lisplank ukuran (3 x 20) cm, kayu kelas I atau
15 A.4.6.1.21. m'
kelas II -
Pemasangan 1 m’ lisplank ukuran (3 x 30) cm, kayu kelas I atau
16 A.4.6.1.22. m'
kelas II -
IX PEKERJAAN LANTAI
1 Pengurugan 1 m3 dengan pasir urug A.2.3.1.11. m3 -
13 Pemasangan 1 buah bak kontrol pasangan bata 30x30 tinggi 35 cm A.5.1.1 15. bh
-
14 Pemasangan 1 m’ pipa galvanis diameter ½” A.5.1.1 18. m' -
15 Pemasangan 1 m’ pipa PVC tipe AW diameter ½ ” A.5.1.1 25. m' -
16 (K3) Pemasangan 1 buah titik lampu (Instalasi) A.8.4.6.1 bh -
17 (K3) Pemasangan 1 buah MCB (Penyambungan Daya ke PLN) A.8.4.6.1 bh -
-
VII - 315
XI PEKERJAAN MENGECAT
1 m2 Pengecatan bidang kayu baru (1 lapis plamuur, 1 lapis cat
1 A.4.7.1.4. m2
dasar, 2 lapis cat penutup) -
Pengecatan 1 m2 tembok baru (1 lapis plamuur, 1 lapis cat dasar, 2
2 A.4.7.1.10. m2
lapis cat penutup) -
3 Pengecatan 1 m2 permukaan baja dengan menie besi A.4.7.1.16. m2 -
REKAPITULASI
I PEKERJAAN PERSIAPAN Rp -
II PEKERJAAN BONGKARAN Rp -
III PEKERJAAN GALIAN/URUGAN Rp -
IV PEKERJAAN PONDASI Rp -
V PEKERJAAN BETON/PEMBESIAN Rp -
VI PEKERJAAN PASANGAN DINDING BATA Rp -
VII PEKERJAAN KUSEN,PINTU DAN JENDELA Rp -
VIII PEKERJAAN KUDA-KUDA / ATAP Rp -
IX PEKERJAAN LANTAI Rp -
X PEKERJAAN BESI / LAIN-LAIN Rp -
XI PEKERJAAN MENGECAT Rp -
JUMLAH -
PPN 10 % Rp -
JUMLAH TOTAL Rp -
DIBULATKAN Rp -
TERBILANG : ( ………………………………………….. )
Sumber, 2020
VII - 316
Paraf
Tim Teknis Penyusun
Disiapkan
Analisa
Diperiksa Kasie Perencanaan
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.084 80,000.00 6,720.00
Tukang batu L.02 OH 0.125 110,000.00 13,750.00
Kepala tukang L.03 OH 0.130 120,000.00 15,600.00
Mandor L.04 OH 0.004 120,000.00 480.00
JUMLAH TENAGA KERJA 36,550.00
B BAHAN
Nok Selulosa 1.042 94,875.00 98,859.75
Paku/Screw 8.330 1,380.00 11,495.40
JUMLAH HARGA BAHAN 110,355.15
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.200 80,000.00 16,000.00
Tukang batu L.02 OH 0.100 110,000.00 11,000.00
Kepala tukang L.03 OH 0.010 120,000.00 1,200.00
Mandor L.04 OH 0.001 120,000.00 120.00
JUMLAH TENAGA KERJA 28,320.00
B BAHAN
Atap Selulosa 3.230 58,075.00 187,582.25
Paku/Screw 16.150 1,380.00 22,287.00
JUMLAH HARGA BAHAN 209,869.25
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.084 80,000.00 6,720.00
Tukang batu L.02 OH 0.125 110,000.00 13,750.00
Kepala tukang L.03 OH 0.130 120,000.00 15,600.00
Mandor L.04 OH 0.004 120,000.00 480.00
JUMLAH TENAGA KERJA 36,550.00
B BAHAN
Nok Selulosa 1.300 101,200.00 131,560.00
Paku/Screw 10.000 1,380.00 13,800.00
JUMLAH HARGA BAHAN 145,360.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.140 80,000.00 11,200.00
Tukang batu L.02 OH 0.070 110,000.00 7,700.00
Kepala tukang L.03 OH 0.007 120,000.00 840.00
Mandor L.04 OH 0.007 120,000.00 840.00
JUMLAH TENAGA KERJA 20,580.00
B BAHAN
Atap Bitumen Bergelombang Monolayer 3 mm 0.650 189,175.00 122,963.75
Paku atau Sekrup 9.100 1,380.00 12,558.00
JUMLAH HARGA BAHAN 135,521.75
C PERALATAN
Sumber, 2020
1 m2 Tebas Tebang Berupa Memotong dan Membersihkan Lokasi dari Tanaman/Tumbuhan dia
< 15 cm
Kode Analisa T.02