HARGA BANTALAN JEMBATAN DARI IBU NELLY ROSA

UK. 0.18 x 0.22 x 2 = 0.0792 M3 = Rp. 633,608.00

1 M3 : 0.0792 M3 = 12.626 BTG x Rp. 633,608.00 = Rp. 8,000,101.01

208 BTG : 12.626 = 16.4736 x Rp. 8,000,000.00 = Rp. 131,788,800.00

HARGA BANTALAN MJ DARI IBU NELLY ROSA

UK. 0.13 x 0.22 x 2 = 0.0572 M3 = Rp. 457,608.00

1 M3 : 0.0572 M3 = 17.483 BTG x Rp. 457,608.00 = Rp. 8,000,139.86

20 BTG : 17.4825 = 1.144 x Rp. 8,000,000.00 = Rp. 9,152,000.00

208 BTG BANTALAN JEMBATAN = Rp. 131,788,800.00


20 BTG BANTALAN MJ = Rp. 9,152,000.00

228 BTG JUMLAH = Rp. 140,940,800.00

Medan, Tgl. 11 September 2015


HARGA BANTALAN JEMBATAN DARI KEHUTANAN

UK. 0.18 x 0.22 x 2 = 0.0792 M3 = Rp. 633,608.00

1 M3 : 0.0792 M3 = 12.626 BTG x Rp. 633,608.00 = Rp. 8,000,101.01

208 BTG : 12.626 = 16.4736 x Rp. 7,000,000.00 = Rp. 115,315,200.00

HARGA BANTALAN MJ DARI KEHUTANAN

UK. 0.13 x 0.22 x 2 = 0.0572 M3 = Rp. 457,608.00

1 M3 : 0.0572 M3 = 17.483 BTG x Rp. 457,608.00 = Rp. 8,000,139.86

20 BTG : 17.4825 = 1.144 x Rp. 7,000,000.00 = Rp. 8,008,000.00

208 BTG BANTALAN JEMBATAN = Rp. 115,315,200.00


20 BTG BANTALAN MJ = Rp. 8,008,000.00

228 BTG JUMLAH = Rp. 123,323,200.00

Medan, Tgl. 11 September 2015


PEMBELIAN PREMIUM MOBIL PICK UP BK.9342 DN UNTUK
MELANGSIR LORI / ALAT2 KERJA
NO SEBANYAK
TANGGAL
KETERANGAN
PEMBELIAN
URUT

1 20-08-2018 Rp. 100,000.00

2 24-08-2018 Rp. 100,000.00

3 13-09-2018 Rp. 50,000.00

4 15-09-2018 Rp. 50,000.00

5 20-09-2018 Rp. 50,000.00

6 21-09-2018 Rp. 50,000.00

7 22-09-2018 Rp. 50,000.00

8 25-09-2018 Rp. 50,000.00

9 26-09-2018 Rp. 50,000.00

10 27-09-2018 Rp. 50,000.00

11 28-09-2018 Rp. 50,000.00

12 29-09-2018 Rp. 50,000.00

JUMLAH Rp. 700,000.00

Medan, Tgl.02 Oktober 2018


DAFTAR PEMBELIAN BAHAN-BAHAN UNTUK BH. 86

NOMOR BANYAK HARGA SATUAN JUMLAH HARGA TANGGAL


BAHAN YANG DIBELI
URUT NYA Rp. Rp. PEMBELIAN

1. Kayu sembarang keras 55 btg 126,000.00 6,930,000.00 30 Juni 2018

2 Paku 12 kg 12,000.00 144,000.00 30 Juni 2018

3 Seng 20 lbr 65,000.00 1,300,000.00 30 Juni 2018

4 Tripleks 4 mm 20 lbr 55,000.00 1,100,000.00 30 Juni 2018


JUMLAH 9,474,000.00
5 Besi beton U.24 450 kg 12,500.00 5,625,000.00 10 Juli 2018

5 Multripleks 12 mm 24 lbr 90,000.00 2,160,000.00 10 Juli 2018

6 Kawat Beton 30 kg 20,000.00 600,000.00 10 Juli 2018


JUMLAH 8,385,000.00
7 Semen Portland 240 bh 45,000.00 10,800,000.00 30 Juli 2018

8 Pasir 2 Truk 125,000.00 250,000.00 30 Juli 2018


JUMLAH 11,050,000.00
9 Batu pecah 45 m3 210,000.00 9,450,000.00 09 Agst 2018

10 Pipa galvanis 20 bh 65,000.00 1,300,000.00 09 Agst 2018


JUMLAH 10,750,000.00
11 Cat Tembok 75 kg 180,000.00 13,500,000.00 20 Agst 2018
JUMLAH 13,500,000.00
12 Ongkos Kerja 1 unit 86,000,000.00 86,000,000.00 27 Agst 2018

JUMLAH SELURUHNYA --------------------------------------- 139,159,000.00

Medan Tgl.30 Agustus 2018

Kepada :
CV. TRI MUTIARA INDAH
DI-
T EMP A T
9,474,000.00

8,385,000.00

11,050,000.00

10,750,000.00

13,500,000.00
86,000,000.00

139,159,000.00