HARGA JUMLAH
NO URAIAN JENIS PEKERJAAN / KEGIATAN SATUAN VOLUME SATUAN HARGA
(Rp) (Rp)
I PEKERJAAN PERSIAPAN
1 Papan Nama Proyek Paket 1.000
2 Mobilisasi dan demobilisasi Paket 1.000
VI PEKERJAAN PLAFOND
1 Penutup Plafond GRC Board Interior Standar M2 427.000
1 Penutup Plafond GRC Board Interior Variasi M2 348.000
2 Rangka Plafond besi hollow 1 x 40.40.2 mm, Modul 60 x 120 cm, Standar M2 427.000
2 Rangka Plafond besi hollow 1 x 40.40.2 mm, Modul 60 x 120 cm, Variasi M2 348.000
3 Listprofil Gypsum M' 184.722
IX PEKERJAAN ATAP
1 Penutup Atap Genteng Metal setara Sakura Roof M2 1,670.540
2 Kuda - Kuda Atap Rangka Baja Ringan (Zinc.CT.75.75) M2 1,670.540
3 Bubungan Atap M2 161.020
4 Listplank GRC Board 3/20 cm M' 329.880
XI PEKERJAAN RELLING
1 Relling Tangga Stainless Steel Kotak 4x4 M' 31.740
2 Relling Balkon Stainless Steel Kotak 4x4 M' 55.200
REKAPITULASI
JUMLAH
NO URAIAN JENIS PEKERJAAN / KEGIATAN HARGA
(Rp)
I PEKERJAAN PERSIAPAN
II PEKERJAAN METSEL / BETON
III PEKERJAAN BETON BERTULANG
IV PEKERJAAN TEGEL LANTAI DAN DINDING
V PEKERJAAN KUSEN PINTU, JENDELA
VI PEKERJAAN PLAFOND
VII PEKERJAAN INSTALASI LISTRIK
VIII PEKERJAAN SANITASI
IX PEKERJAAN ATAP
X PEKERJAAN PENGECATAN DAN FINISHING
XI PEKERJAAN RELLING
XII PEKERJAAN LAIN - LAIN
Terbilang :
……………………….. ……………………….
Direktur Pimpinan Teknik