Anda di halaman 1dari 1

Saluran Primer

S DI
Kedungwaru TA PO

0
2.0

I
RS

NE
6
A 1302 Ha.

0.6

VE

GO
+6
Q 5.11 m3/s

UNI

RO
v 0.4650 m/s
k 42.5
i 0.000184
m 1.5
S EM
+6
4m A R AN G
0.6 4.0 b

1
3.1
6 0

.51
h 1.40 m

9
+5
w 0.75 m DEPARTEMEN TEKNIK SIPIL
4.0
H 2.15 m FAKULTAS TEKNIK
0 UNIVERSITAS DIPONEGORO

.59

0
4.0
8
+5
+5
8.5
9 TUGAS AKHIR
1.5
1
0

JUDUL GAMBAR
.66
2.0

+5
0

8.5
+6

3.1

BANGUNAN BAGI SADAP


+5
8.5
9
B.Kw.1 (Hm. 23+52)
Saluran Sekunder
+6 Sendang Wates
0.66
A 584.47 Ha.
Q 1.863 m3/s SKALA
v 0.518 m/s
k 40
1 : 100
i 0.00017
4.0 m 1.50
0
b 1.90 m KETERANGAN
h 1.10 m
w 0.60 m
4.0 H 1.70 m ALIRAN AIR
0 TALUD

PASANGAN BETON PASANGAN BATU

Saluran Sekunder
+5
8.3
NO GAMBAR HALAMAN
9
Belor
A 694.28 Ha.
+5
- -
Q 2.017 m3/s 9.9
+5 9
v 0.527 m/s 8.3
9
k 40 DIKERJAKAN OLEH:
i 0.000218
9
8.2
+5

m 1.5
+5
b 2.10 m 8.39
RIZKO YUMNA SATRIO

+5
h 1.10 m

9.9
2.4
w 0.60 m 21010116130118

1.5
6

1
1.5
+5

0
H 1.70 m 9.9
9
9

8.2

9
9.9

BRILLIANTY GITA KAREEN


4.0
+5

1.9
+5

+5
0
21010116140172

8.3
9
2.4

+5
6
9
8.2

9
2

.49
2.5
DIKOREKSI OLEH:
+5

4.0

1 1.5
0

9 0
9.9 2.2
+5 DOSEN PEMBIMBING I
9

0
Saluran Tersier
9.9

1.5 9
8.2 Kw1

+5
+5

+5 2

9.9
2.5
A 19.386 Ha.

1.5
9

0
Q 0.049 m3/s Dr. Ir. Hari Nugroho, M.T.
9 0.4
9.3 v 0.228 m/s 0
+5
35
NIP. 196610051992031003
k
i 0.000412 1.0
0 DOSEN PEMBIMBING II
9.9
9 m 1
+5 0.40 m
1.5
0 b 1.0
0
h 0.40 m 0 2.0 4.0 6.0 8.0 10.0 m
w 0.40 m
Prof. Dr. Ir. Sri Sangkawati, M.S.
H 0.80 m
NIP. 195409301980032001

Anda mungkin juga menyukai