REKAPITULASI VOLUME PEKERJAAN

PEKERJAAN :
PEMBUAT KOMITMEN :
PEKERJAAN :
TAHUN ANGGARAN :
SUMBER DANA :

VOLUME HARGA SATUAN JUMLAH HARGA


NO. URAIAN PEKERJAAN KET
PEKERJAAN ( Rp ) ( Rp )
1 2 4 5. 6 7

I. PEKERJAAN PENDAHULUAN
1 Pek. Mobilisasi dan Demobilisasi
2 Pek. Pengukuran dan Uitzet
3 Pek. Shop Drawing dan As Drawing
4 Pek. Fasilitas Pengendali Mutu

II. PEKERJAAN BANGUNAN DAN SALURAN

1 Pek. Galian tanah sedalam 1m 162.00 m3 63,270.00 10,249,740.00


2 Pek. Cetakan Beton 31.35 m2 80,440.00 2,521,794.00
3 Pek. Besi Tulangan Polos 1.65 Ton 23,529,550.00 38,734,632.45
4 Pek. BETON MUTU fc' = 10 Mpa (K100), slump (12 ± 2) cm 40.34 m3 850,000.00 34,286,450.00
5 Pek. Timbunan Tanah Kembali 62.70 m3 90,540.00 5,676,858.00

Sub. Jumlah 91,469,474.45


#REF!

SATUAN KERJA : TYPE SALURAN : SALURAN UTAMA


PEMBUAT KOMITMEN :
PEKERJAAN : ITEM : CETAKAN BETON
LOKASI :
NOMOR KONTRAK : BAGIAN : BANGUNAN DAN SALURAN
TANGGAL KONTRAK :
PENYEDIA JASA : LOKASI :
KONSULTAN PENGAWAS :
SKET/ GAMBAR PERHITUNGAN

Gambar Cetakan Beton Dinding Saluran Panjang Saluran : 209.00 m1


Luas Cetakan Dinding Saluran
Luas Cetakan : Panjang Saluran x 2 Cetakan Luar ( a )
: 209.00 x x 0.15
Luas cetakan Saluran : 31.35 m2

Keterangan :

a) 0.15 Meter

Diperiksa Oleh Diperiksa Oleh Diperiksa Oleh Di buat Oleh


PELAKSANA TEKNIS PENGAWAS LAPANGAN

Inspector Site Manager


#REF!

SATUAN KERJA : TYPE SALURAN : SALURAN UTAMA


PEMBUAT KOMITMEN :
PEKERJAAN : ITEM : BESI TULANGAN SIRIP/POLOS
LOKASI :
NOMOR KONTRAK : BAGIAN : BANGUNAN DAN SALURAN
TANGGAL KONTRAK :
PENYEDIA JASA : LOKASI :
KONSULTAN PENGAWAS :
SKET/ GAMBAR PERHITUNGAN
Gambar Detail Saluran Panjang Saluran = 209.00 M Banyak Tul. Melintang = 1,393.0 Bh
Jarak Tul. Memanjang = 0.15 M Jarak Sambungan = 12.00 M'
Keterangan : Jarak Tul. Melintang = 0.15 M Banyak Sambungan = 13.00 Bh
a) 0,3 Meter Banyak Tul. Memanjang = 13.00 Bh
b) 0.70 Meter
c) 0.20 Meter Diameter Panjang Jumlah Pjg Total kg / M' Total Berat
No. Type Potongan Besi
d) 0.10 Meter (MM') (M') (Bh) (M') (kg) (kg)
e) 0.50 Meter 1 2 3 4 5 6=5*4 7 8=7*6
1 Type 1 7.00 1.90 1,393.00 2,646.70 0.3021 799.53
Gambar Detail Pembesian Type 2
2 Type 2 7.00 209.1 13.00 2,718.30 0.3021 821.16

3 Type 3 7.00 0.50 13.00 84.50 0.3021 25.53

dalam kg 1,646.21
>> J UM L A H
Gambar Detail Pembesian Type 1 Keterangan : dalam ton dibagi 1000 1.65
p) 209.00 Meter
j) 0.05 Meter

Gambar Detail Overlap Pembesian ( Type 3 )

Keterangan :
Keterangan : t) 0.40 Meter
f) 0.30 Meter u) 0.05 Meter
g) 0.65 Meter
h) 0.10 Meter
i) 0.05 Meter
Diperiksa Oleh Diperiksa Oleh Diperiksa Oleh Di buat Oleh
PELAKSANA TEKNIS PENGAWAS LAPANGAN
#REF!
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
PT. KRAMAT KULON
DIREKTORAT JENDERAL SUMBER DAYA AIR
SATUAN KERJA : TYPE SALURAN : SALURAN UTAMA
PEMBUAT KOMITMEN :
PEKERJAAN : ITEM : BETON MUTU fc' = 10 Mpa (K100), slump (12 ± 2) cm
LOKASI :
NOMOR KONTRAK : BAGIAN : BANGUNAN DAN SALURAN
TANGGAL KONTRAK :
PENYEDIA JASA : LOKASI :
KONSULTAN PENGAWAS :
SKET/ GAMBAR PERHITUNGAN
Gambar Penampang Saluran
Detail Dimensi Area I Panjang Saluran = 209.00 M'
Keterangan :
a) 0.08 Meter Volume Area I = P x ('1/2 x b x a)
b) 0.10 Meter = 209.00 x 0.50 x 0.10 x 0.08
= 0.84 x 2 Sisi
= 1.67 m3

Volume Area II = P x c x d
= 209.00 x 0.10 x 0.10
= 2.09 x 2 Sisi
= 4.18 m3
Detail Dimensi Area II Detail Dimensi Area IV
Keterangan : Volume Area III = P x e x f
c) 0.10 Meter = 209.00 x 0.10 x 0.650
d) 0.10 Meter = 13.585 x 2 Sisi
= 27.17 m3

Volume Area IV = P x (g + h x 1/2 i )


Detail Dimensi Area III = 209.00 x 0.30 + 0.400 x 0.050
Keterangan : Keterangan : = 209.00 x 0.035
e) 0.10 Meter g) 0.30 Meter = 7.32 m3
f) 0.65 Meter h) 0.40 Meter
i) 0.10 Meter TOTAL VOLUME = I + II + III + IV
SALURAN = 1.67 + 4.18 + 27.17 + 7.32
= 40.34 m3

Diperiksa Oleh Diperiksa Oleh Diperiksa Oleh Di buat Oleh


PELAKSANA TEKNIS PENGAWAS LAPANGAN
Saluran 212.00
Box 3.00
Total 209.00
Berat Besi per m3
RAB 1,050.00 Kg 2.75 m1

Panjang Bh P. Total T. Berat


10.00 1.90 18.0 34.20 0.6165 21.08
2.89 17.00 49.21 0.6165 30.34
51.42 Kg

7.87661343 21.66
REKAPITULASI VOLUME
SATUAN KERJA :
PEMBUAT KOMITMEN :
PEKERJAAN :
LOKASI :
NOMOR KONTRAK :
TANGGAL KONTRAK :
PENYEDIA :
### :

Tebas Pembersihan Galian Tanah Biasa #REF! Timbunan Tanah Kembali Dipadatkan
NOMOR Jarak Patok
KET
PATOK Area Area Rata² Volume Vol.Komulatif Area Area Rata² Volume Vol.Komulatif Area Area Rata² Volume Vol.Komulatif Area Area Rata² Volume Vol.Komulatif
( M' ) ( M1 ) ( M1 ) ( M2) ( M2 ) ( M2 ) ( M2 ) ( M3) ( M3) ( M2 ) ( M2 ) ( M3) ( M3) ( M2 ) ( M2 ) ( M3) ( M3)
1 2 3 4 5 6 7 8 9 10 15 16 17 18 19 20 21 22 23

P. 0a #REF! #REF! #REF! -


3.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
P. 0 #REF! #REF! #REF! #REF!
25.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
P. 1 #REF! #REF! #REF! #REF!
25.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
P. 2 #REF! #REF! #REF! #REF!
25.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
P. 3 #REF! #REF! #REF! #REF!
25.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
P. 4 #REF! #REF! #REF! #REF!
25.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
P. 5 #REF! #REF! #REF! #REF!
25.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
P. 6 #REF! #REF! #REF! #REF!
25.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
P. 7 #REF! #REF! #REF! #REF!
25.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
P. 8 #REF! #REF! #REF! #REF!
9.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
P. 9 #REF! #REF! #REF! #REF!

TOTAL VOLUME #REF! #REF! #REF! #REF!

diperiksa oleh : Diperiksa Oleh dibuat oleh :


PELAKSANA TEKNIS PENGAWAS LAPANGAN
0 0
0 Site Manager

Anda mungkin juga menyukai