RAB Gedung Kantor (24x7) M
RAB Gedung Kantor (24x7) M
04 PEKERJAAN ARSITEKTUR
04.01 PEKERJAAN DINDING
04.01.01 Pasangan Dinding Batako m2 301.03
04.01.02 Plaster & Aci m2 602.06
04.01.03 Partisi GRC + Rangka Partisi m 2
11.82
05.02 SANITARI
05.02.01 Kitchen sink + kran set 1.00
05.02.02 Washbasin + kran set 2.00
05.02.03 Closet + kran set 2.00
05.02.04 Jet Shower + kran set 2.00
05.02.05 Bath Shower + kran & accessories set 2.00
05.02.06 Floor Drain set 2.00
05.03 PERPIPAAN
05.03.01 Septic Tank unit 1.00
05.03.02 Pipa Air Bersih titik 9.00
05.03.03 Pipa Air Bekas titik 5.00
05.03.04 Pipa Air Kotor titik 2.00
Total
GGARAN BIAYA
Rp 14,211,970.00
Rp 21,450.00 Rp 3,603,600.00
Rp 108,691.00 Rp 7,608,370.00
Rp 1,000,000.00 Rp 1,000,000.00
Rp 1,500,000.00 Rp 1,500,000.00
Rp 500,000.00 Rp 500,000.00
Rp 2,962,900.05
Rp 78,111.00 Rp 1,629,211.90
Rp 46,744.50 Rp 892,558.18
Rp 55,000.00 Rp 441,129.98
Rp 18,371,521.29
Rp 292,534.00 Rp 2,106,244.80
Rp 23,202.30 Rp 13,769,636.96
Rp 1,155,388.67 Rp 2,495,639.54
Rp 2,974,377.45
Rp 11,962.50 Rp 386,248.19
Rp 80,157.00 Rp 1,154,260.80
Rp 80,157.00 Rp 1,433,868.46
Rp 38,512,204.39
Rp 313,984.00 Rp 14,977,664.77
Rp 19,737.30 Rp 19,400,963.33
Rp 1,155,388.67 Rp 4,133,576.29
Rp 8,865,010.88
Rp 597,542.00 Rp 6,023,223.36
Rp 19,737.30 Rp 2,342,659.61
Rp 1,155,388.67 Rp 499,127.91
Rp 66,069,480.12
Rp 25,000.00 Rp 4,200,000.00
Rp 11,962.50 Rp 2,009,700.00
Rp 80,157.00 Rp 13,466,376.00
Rp 313,984.00 Rp 19,467,008.00
Rp 1,155,388.67 Rp 19,410,529.72
Rp 19,737.30 Rp 3,315,866.40
Rp 25,000.00 Rp 4,200,000.00
Rp 28,626,597.63
Rp 597,542.00 Rp 19,449,992.10
Rp 19,737.30 Rp 7,564,838.33
Rp 1,155,388.67 Rp 1,611,767.20
Rp 16,051,585.52
Rp 597,542.00 Rp 9,878,086.31
Rp 19,737.30 Rp 5,089,193.74
Rp 1,155,388.67 Rp 1,084,305.47
Rp 35,279,413.49
Rp 610,247.00 Rp 21,423,331.18
Rp 19,737.30 Rp 11,422,417.82
Rp 1,155,388.67 Rp 2,433,664.49
Rp 135,630,774.00
Rp 312,000.00 Rp 72,009,600.00
Rp 127,655.00 Rp 29,462,774.00
Rp 148,000.00 Rp 34,158,400.00
Rp 127,804,133.04
Rp 153,359.25 Rp 46,165,735.03
Rp 128,962.63 Rp 77,643,238.01
Rp 338,000.00 Rp 3,995,160.00
Rp 56,949,670.00
Rp 227,000.00 Rp 1,178,130.00
Rp 210,000.00 Rp 32,596,200.00
Rp 227,000.00 Rp 13,113,790.00
Rp 145,000.00 Rp 10,061,550.00
Rp 35,286,680.00
Rp 179,000.00 Rp 3,633,700.00
Rp 238,000.00 Rp 1,235,220.00
Rp 179,000.00 Rp 431,390.00
Rp 179,000.00 Rp 653,350.00
Rp 179,000.00 Rp 27,519,460.00
Rp 238,000.00 Rp 1,813,560.00
Rp 37,900,000.00
Rp 13,560,000.00 Rp 13,560,000.00
Rp 1,950,000.00 Rp 7,800,000.00
Rp 410,000.00 Rp 820,000.00
Rp 1,815,000.00 Rp 14,520,000.00
Rp 600,000.00 Rp 1,200,000.00
Rp 26,663,864.83
Rp 32,599.60 Rp 13,211,639.89
Rp 32,599.60 Rp 7,112,580.73
Rp 32,599.60 Rp 6,339,644.21
Rp 1,207,000.00
Rp 1,207,000.00
Rp 1,207,000.00
Rp 29,000.00
Rp 32,000.00
Rp 50,000.00
Rp 86,000.00
Rp 141,000.00
Rp 765,000.00
Rp 93,000.00
Rp 31,500.00
Rp 21,034,000.00
Rp 2,500,000.00 Rp 2,500,000.00
Rp 2,097,000.00 Rp 4,194,000.00
Rp 5,420,000.00 Rp 10,840,000.00
Rp 650,000.00 Rp 1,300,000.00
Rp 950,000.00 Rp 1,900,000.00
Rp 150,000.00 Rp 300,000.00
Rp 55,200,000.00
Rp 4,500,000.00 Rp 4,500,000.00
Rp 2,800,000.00 Rp 25,200,000.00
Rp 3,500,000.00 Rp 17,500,000.00
Rp 4,000,000.00 Rp 8,000,000.00
Rp 715,389,212.69 Rp 715,389,212.69
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Membuat Beton Mutu F'c = 7.4 Mpa (K 100), Slump (12 ± 2) cm,W/c= 0.87
Satuan / Unit : M3
Analisa : AHSP PU A.4.1.1.1
Jenis Pekerjaan : Membuat Beton Mutu F'c = 9.8 Mpa (K 125),Slump (12± 2) cm,W/c= 0.78
Satuan / Unit : M3
Analisa : AHSP PU A.4.1.1.2
Jenis Pekerjaan : Beton Mutu F'c = 14,5 Mpa (K 175),Slump (12± 2) cm,W/c = 0,66
Satuan / Unit : M3
Analisa : AHSP PU A.4.1.1.5
Jenis Pekerjaan : Beton Mutu F'c = 16,9 Mpa (K 200),Slump (12± 2) cm,W/c = 0,61
Satuan / Unit : M3
Analisa : AHSP PU A.4.1.1.6
Jenis Pekerjaan : Beton Mutu F'c = 19,3 Mpa (K 225),Slump (12 ± 2) cm,W/c = 0,58
Satuan / Unit : M3
Analisa : AHSP PU A.4.1.1.7
Jenis Pekerjaan : Beton Mutu F'c = 21,7 Mpa (K 250),Slump (12 ± 2) cm,W/c = 0,56
Satuan / Unit : M3
Analisa : AHSP PU A.4.1.1.8
Jenis Pekerjaan : Beton Mutu F'c = 24,0 Mpa (K 275),Slump (12 ± 2) cm,W/c = 0,53
Satuan / Unit : M3
Analisa : AHSP PU A.4.1.1.8
Jenis Pekerjaan : Beton Mutu F'c = 26,4 Mpa (K 300),Slump (12± 2) cm,W/c = 0,52
Satuan / Unit : M3
Analisa : AHSP PU A.4.1.1.8
Jenis Pekerjaan : Pasangan Dinding Bata Tebal 1/2 Bata Camp. 1Pc: 2 PP
Satuan / Unit : M2
Analisa : AHSP PU A.4.4.1.7
Jenis Pekerjaan : Pasangan Dinding Bata Tebal 1/2 Bata Camp. 1Pc: 3 PP
Satuan / Unit : M2
Analisa : AHSP PU A.4.4.1.8
Jenis Pekerjaan : Pasangan Dinding Bata Tebal 1/2 Bata Camp. 1Pc: 4 PP
Satuan / Unit : M2
Analisa : AHSP PU A.4.4.1.9
Jenis Pekerjaan : Pasangan Dinding Bata Tebal 1/2 Bata Camp. 1Pc: 5 PP
Satuan / Unit : M2
Analisa : AHSP PU A.4.4.1.10
Jenis Pekerjaan : Memasang Langit-Langit Tripleks Ukuran (120 x 240) cm, tebal 4 mm
Satuan / Unit : M2
Analisa : AHSP PU A.4.5.1.5
Jenis Pekerjaan : Membuat dan Memasang Kusen Pintu dan Kusen Jendela, Kayu Kelas I
Satuan / Unit : M3
Analisa : AHSP PU A.4.6.1.1
Jenis Pekerjaan : Membuat dan Memasang Daun Pintu Panel Kayu Kelas II
Satuan / Unit : M2
Analisa : AHSP PU A.4.6.1.5
Jenis Pekerjaan : Memasang Listplank Uk. 2.5 x 25 cm Kayu Kelas I atau Kelas II
Satuan / Unit : M1
Analisa : AHSP PU A.4.6.1.21
Jenis Pekerjaan : Cat Bidang Kayu Baru ( 1 x Plamir,1 x Cat Dasar 2x Cat Penutup)
Satuan / Unit : M2
Analisa : AHSP PU A.4.7.1.4
Jenis Pekerjaan : Pengecatan Tembok Baru (1 x Plamir,1 x Cat Dasar,2 x Cat Penutup)
Satuan / Unit : M2
Analisa : AHSP PU A.4.7.1.10
UPAH
NO. TENAGA SATUAN HARGA
1 Mandor Orang Rp 150,000.00
2 Kepala Tukang Orang Rp 140,000.00
3 Tukang Orang Rp 130,000.00
4 Pekerja Orang Rp 120,000.00
BAHAN
NO. MATERIAL BAHAN SATUAN HARGA
1 Air Liter Rp 125.00
2 Atap Seng Genteng Lembar Rp 70,000.00
3 Batu Bata Buah Rp 900.00
4 Batu Kali/Batu belah (Sungaai/Gunung) M3 Rp 195,000.00
5 Batu Belah 5 - 7 M 3
Rp 185,000.00
6 Batu Pecah 2 - 3 M 3
Rp 310,000.00
7 Besi Beton Polos Kg Rp 15,000.00
8 Besi Beton Ulir Kg Rp 18,000.00
9 Bubungan Genteng M1 Rp 45,000.00
10 Besi Baja IWF Kg Rp 18,000.00
11 Besi Strip Profil Kg Rp 17,000.00
12 Cat Dasar Tembok/Sealer Setara Vinilex Kg Rp 30,000.00
13 Cat Dasar Kayu Kg Rp 50,000.00
14 Cat Kayu Mengkilat Kg Rp 60,000.00
15 Cat Kayu Penutup Kg Rp 55,000.00
16 Cat Menie Besi Kg Rp 35,000.00
17 Cat Dasar Tembok Kg Rp 40,000.00
18 Cat Tembok Setara Vinilex Kg Rp 50,000.00
19 Dempul Kayu Kg Rp 18,000.00
20 Dolken Kayu Ø 8 - 10/400 cm Batang Rp 70,000.00
21 Door Holder Pasang Rp 130,000.00
22 Engsel Jendela Pasang Rp 25,000.00
23 Engsel Pintu Pasang Rp 25,000.00
24 Floor Drain Buah Rp 25,000.00
25 Gagang Jendela Buah Rp 15,000.00
26 Gypsum Board Tebal 9 mm Lembar Rp 120,000.00
27 Hak Angin Pasang Rp 16,000.00
28 Jaring Kawat Baja Kg Rp 35,000.00
29 Kaca Bening Uk. 3 mm M2 Rp 85,000.00
30 Kaca Bening Uk. 5 mm M 2
Rp 110,000.00
31 Kaca Rayband Uk. 5 mm M 2
Rp 130,000.00
32 Kaso-Kaso (5 x 7) cm M3 Rp 3,250,000.00
33 Kawat Beton Kg Rp 19,000.00
34 Kayu Kelas I (Seumantok /Ulim /dll) M3 Rp 5,500,000.00
35 Kayu Kelas II (Kamper /Kruing /dll) M 3
Rp 4,750,000.00
36 Kayu Kelas III (Borneo /dll) M3 Rp 3,900,000.00
37 Kayu Kelas IV (Sengon /dll) M3 Rp 3,500,000.00
38 Kayu Dolken Btg Rp 70,000.00
39 Keramik Uk. 10 x 10 cm Bh Rp 3,000.00
40 Keramik Uk. 20 x 20 cm Bh Rp 5,000.00
41 Keramik UK. 30 x 30 cm Bh Rp 7,000.00
42 Keramik Uk. 40 x 40 cm Bh Rp 12,000.00
43 Keramik Uk. 60 x 60 cm Bh Rp 40,000.00
44 Keramik Uk. 20 x 25 cm Bh Rp 10,000.00
45 Kertas Amplas Lembar Rp 2,500.00
46 Kloset Duduk Keramik Setara toto + Tabung Buah Rp 1,500,000.00
47 Kloset Jongkok Keramik Setara toto Buah Rp 400,000.00
48 Kran Air 3/4" Buah Rp 20,000.00
49 Kuas Cat Buah Rp 15,000.00
50 Kunci Pintu (Standar) Buah Rp 150,000.00
51 Kunci Pintu Biasa Buah Rp 100,000.00
52 Karawang /Roster Buah Rp 50,000.00
53 Lampu Hemat Energi 11 Watt Setara Hannochs Buah Rp 35,000.00
54 Lampu Hemat Energi 18 Watt Setara Hannochs Buah Rp 40,000.00
55 Lampu Hemat Energi 20 Watt Setara Hannochs Buah Rp 45,000.00
56 Lem Kayu Kg Rp 18,000.00
57 List Eternit Kayu M1 Rp 8,000.00
58 Minyak Cat Liter Rp 25,000.00
59 Minyak Bekisting Liter Rp 8,000.00
60 Multipleks 3 mm Lembar Rp 80,000.00
61 Multipleks 4 mm Lembar Rp 90,000.00
62 Multipleks 6 mm Lembar Rp 130,000.00
63 Multipleks 9 mm Lembar Rp 150,000.00
64 Pacok Jendela dan Ventilasi Pasang Rp 8,000.00
65 Paku Asbes Kg Rp 20,000.00
66 Paku Beton 8 Inci Kotak Rp 19,000.00
67 Paku Kait Buah Rp 1,000.00
68 Paku Kayu Kg Rp 18,000.00
69 Paku Triplek Kg Rp 19,000.00
70 Paku Seng Kg Rp 20,000.00
71 Paku Sumbat Buah Rp 1,200.00
72 Paku Sekrup Kg Rp 24,000.00
73 Pasir Batu (Sirtu) - Material Jalan M3 Rp 300,000.00
74 Pasir Beton / Kerikil M 3
Rp 200,000.00
75 Pasir Pasang M 3
Rp 185,000.00
76 Pasir Urug M 3
Rp 150,000.00
77 Pelumas / Oil Liter Rp 35,000.00
78 Plamur Kayu Kg Rp 25,000.00
79 Plamur Tembok Kg Rp 30,000.00
80 Plywood Tebal 9 mm Lembar Rp 140,000.00
81 Plin Keramik Buah Rp 4,500.00
82 Residu Kg Rp 10,000.00
83 Reservoir Air 1000 Liter Buah Rp 1,200,000.00
84 Reservoir Air 1500 Liter Buah Rp 1,850,000.00
85 Schakelar Buah Rp 12,000.00
86 Semen @ 40 Kg Buah Rp 55,000.00
87 Semen @ 40 Kg Kg Rp 1,375.00
88 Semen Putih @ 50 Kg Zak Rp 90,000.00
89 Semen Warna Kg Rp 18,000.00
90 Seng Genteng Metal M2 Rp 65,000.00
91 Seng BJLS 0,20 Cat Pabrik M2 Rp 65,000.00
92 Seng Gelombang BJLS 30 M2 Rp 47,500.00
93 Seng Plat BJLS 20 M2 Rp 55,000.00
94 Sekrup Fixer Buah Rp 500.00
95 Sealant Kg Rp 15,000.00
96 Sumur + Pompa Tangan Terpasang Unit Rp 1,750,000.00
97 Tanah Timbun M3 Rp 65,000.00
98 Teralis Besi M 2
Rp 375,000.00
99 Titik Lampu + Instalasi Titik Rp 150,000.00
100 Urinoir Keramik Buah Rp 2,350,000.00
101 Zakering Buah Rp 300,000.00
102 Pemasangan Atap Baja Ringan M2 Rp 300,000.00
103 Wire Mesh (Ulir) Titik Rp 150,000.00
104 Tiang Pancang M1 Rp 250,000.00
105 Pipa PVC 1" Batang Rp 35,000.00
106 Pipa PVC 2" Batang Rp 55,000.00
107 Pipa PVC 3" Batang Rp 100,000.00
No. Alat
1 Stamper Jam Rp 25,000.00
2 Dump Truck Jam Rp 75,000.00
3 Molen Jam Rp 50,000.00
REKAPITULASI
ENGINEER ESTIMATE (EE)
PEMBANGUNAN BILIK SANTRI
DAYAH BAYANUDDIN
SIMPANG ULIM
1 LANTAI 1
A PEKERJAAN PERSIAPAN Rp 13,254,270.40
B PEKERJAAN TANAH DAN PONDASI Rp 38,473,209.28
C PEKERJAAN PASANGAN DAN PLASTERAN Rp 54,464,624.08
D PEKERJAAN BETON BERTULANG Rp 162,567,419.86
E PEKERJAAN LANTAI Rp 32,859,438.70
F PEKERJAAN TANGGA Rp 33,078,905.07
G PEKERJAAN PINTU, JENDELA DAN KUNCI Rp 31,070,554.70
H PEKERJAAN INSTALASI LISTRIK Rp 377,000.00
I PEKERJAAN PLAFOND Rp 12,348,827.70
J PEKERJAAN PENGECATAN Rp 17,934,888.77
B. LANTAI 2
A PEKERJAAN BETON BERTULANG Rp 151,292,660.17
B PEKERJAAN PASANGAN DAN PLESTERAN Rp 59,804,534.07
C PEKERJAAN LANTAI Rp 97,318,852.25
D PEKERJAAN PINTU, JENDELA DAN KUNCI Rp 30,007,126.85
E PEKERJAAN ATAP DAN PLAFOND Rp 100,592,919.70
F PEKERJAAN INSTALASI LISTRIK Rp 520,000.00
G PEKERJAAN PENGECATAN Rp 27,032,985.55
JUMLAH Rp 862,998,217.15
SUB TOTAL Rp 862,998,217.15
DIBULATKAN Rp 862,990,000.00
TERBILANG : Delapan Ratus Delapan Belas Juta Lima Ratus Tujuh Puluh Ribu Rupiah
Nama
Jabatan
ENGINEER ESTIMATE (EE)
Pekerjaan Lantai 1
1 2 3 4 5 6 7=3x6
A PEKERJAAN PERSIAPAN
1 Pembersihan Lapangan 202.40 m2 AHSP PU A.2.2.1.9 Rp 21,450.00 Rp 4,341,480.00
2 Pengukuran / Pemasangan Bouplank 54.40 m1 AHSP PU A.2.2.1.4 Rp 108,691.00 Rp 5,912,790.40
3 Administrasi dan Dokumentasi 1.00 Ls Taksir Rp 1,000,000.00 Rp 1,000,000.00
4 K3 dan Lain-lain 1.00 Ls Taksir Rp 1,500,000.00 Rp 1,500,000.00
5 Papan Nama Proyek 1.00 Ls Taksir Rp 500,000.00 Rp 500,000.00
Sub Jumlah Rp 13,254,270.40
B PEKERJAAN TANAH DAN PONDASI
1 Galian Tanah Pondasi Tapak 25.06 m3 AHSP PU A.2.3.1.8a 78,111.00 Rp 1,957,149.22
Urugan Kembali Galian Pondasi Tapak 18.79 m3 AHSP PU A.2.3.1.9 46,744.50 Rp 878,422.64
Pas. Pasir Alas 0.86 m3 AHSP PU A.2.3.1.11 239,250.00 Rp 206,712.00
Pas. Batu Kosoeng / Aanstamping 1.73 m3 AHSP PU A.3.2.1.9 499,851.00 Rp 863,742.53
2 Anak Tangga
Beton K-250 0.54 m3 AHSP PU A.4.1.1.8 Rp 1,155,388.67 Rp 623,909.88
Besi Tulangan Pokok ø 12 73.94 kg AHSP PU A.4.1.1.17 Rp 19,737.30 Rp 1,459,454.91
Bekisting + Perawatan Beton 4.50 m2 AHSP PU A.4.1.1.26 Rp 652,817.00 Rp 2,937,676.50
3 Plat Bordes
Beton K-250 0.57 m3 AHSP PU A.4.1.1.8 Rp 1,155,388.67 Rp 660,882.32
Besi Tulangan Pokok ø 12 136.93 kg AHSP PU A.4.1.1.17 Rp 19,737.30 Rp 2,702,694.28
Bekisting + Perawatan Beton 8.33 m2 AHSP PU A.4.1.1.26 Rp 652,817.00 Rp 5,440,141.67
4 Keramik
Pas. Keramik Anak Tangga + Bordes 11.86 m2 AHSP PU A.4.4.3.34.a Rp 290,851.00 Rp 3,449,492.86
5 Relling Tangga
Besi Hollow 33.81 m1 Taksir Rp 200,000.00 Rp 6,762,000.00
Sub Jumlah Rp 33,078,905.07
G PEKERJAAN PINTU, JENDELA DAN KUNCI
1 Pas. Pintu P1
Kusen Pintu 0.167 m3 AHSP PU A.4.6.1.1 Rp 11,007,700.00 Rp 1,840,839.69
Daun Pintu 6.72 m2 AHSP PU A.4.6.1.5 Rp 834,350.00 Rp 5,606,832.00
Kusen Ventilasi 0.10 m3 AHSP PU A.4.6.1.1 Rp 11,007,700.00 Rp 1,057,795.94
Papan Ventilasi/Jelusi 0.06 m3 AHSP PU A.4.6.1.10 Rp 826,485.00 Rp 53,635.57
Kunci Pintu (Standar) 4.00 Buah AHSP PU A.4.6.2.4 Rp 245,355.00 Rp 981,420.00
Engsel Pintu 8.00 Buah AHSP PU A.4.6.2.5 Rp 53,372.00 Rp 426,976.00
Pacok Pintu 4.00 Buah Taksir Rp 15,000.00 Rp 60,000.00
2 Pas. Jendela J1
Kusen Jendela 0.168 m3 AHSP PU A.4.6.1.1 Rp 11,007,700.00 Rp 1,854,577.30
Daun Jendela 3.84 m2 AHSP PU A.4.6.1.6 Rp 623,700.00 Rp 2,395,008.00
- Kaca 5 mm 2.50 m2 AHSP PU A.6.2.17 Rp 159,797.00 Rp 399,876.01
Kusen Ventilasi 0.14 m3 AHSP PU A.4.6.1.1 Rp 11,007,700.00 Rp 1,545,481.08
Papan Ventilasi / Jelusi 0.09 m3 AHSP PU A.4.6.1.10 Rp 826,485.00 Rp 71,514.09
- Hak Angin / Gagang Jendela 16.00 Buah AHSP PU A.4.6.2.9 Rp 43,472.00 Rp 695,552.00
- Engsel Jendela 16.00 Buah AHSP PU A.4.6.2.6 Rp 53,372.00 Rp 853,952.00
- Pacok Jendela 8.00 Buah AHSP PU A.4.6.2.10 Rp 34,672.00 Rp 277,376.00
3 Jendela J2
Kusen Jendela 0.227 m3 AHSP PU A.4.6.1.1 Rp 11,007,700.00 Rp 2,500,244.95
Daun Jendela 5.76 m2 AHSP PU A.4.6.1.6 Rp 623,700.00 Rp 3,592,512.00
- Kaca 5 mm 3.75 m2 AHSP PU A.6.2.17 Rp 159,797.00 Rp 599,814.02
Kusen Ventilasi 0.19 m3 AHSP PU A.4.6.1.1 Rp 11,007,700.00 Rp 2,088,116.66
Papan Ventilasi / Jelusi 0.13 m3 AHSP PU A.4.6.1.1 Rp 11,007,700.00 Rp 1,428,711.40
- Hak Angin / Gagang Jendela 24.00 Buah AHSP PU A.4.6.2.9 Rp 43,472.00 Rp 1,043,328.00
- Engsel Jendela 24.00 Buah AHSP PU A.4.6.2.6 Rp 53,372.00 Rp 1,280,928.00
- Pacok Jendela 12.00 Buah AHSP PU A.4.6.2.10 Rp 34,672.00 Rp 416,064.00
Sub Jumlah Rp 31,070,554.70
H PEKERJAAN INSTALASI LISTRIK
1 Lampu Saving Energi 18 Watt 9 Bh Taksir Rp 23,000.00 Rp 207,000.000
2 Saklar Tunggal 1 Bh Taksir Rp 10,000.00 Rp 10,000.000
3 Saklar Ganda 4 Bh Taksir Rp 15,000.00 Rp 60,000.000
4 Stop Kontak 5 Bh Taksir Rp 20,000.00 Rp 100,000.000
Sub Jumlah Rp 377,000.000
I PEKERJAAN PLAFOND
1 Rangka Plafond Kayu Klas II 54.76 m2 AHSP PU A.4.6.1.20 Rp 138,792.50 Rp 7,600,277.30
2 Plafon Triplek 6 mm 54.76 m2 AHSP PU A.4.5.1.7 Rp 60,280.00 Rp 3,300,932.80
3 Kayu List Plafond 59.20 m1 AHSP PU A.4.5.1.9 Rp 24,453.00 Rp 1,447,617.60
Sub Jumlah Rp 12,348,827.700
J PEKERJAAN PENGECATAN
1 Cat Dinding Luar Dan Dalam 369.82 m2 AHSP PU A.4.7.1.10 Rp 32,599.60 Rp 12,056,010.15
2 Cat Plafond 54.76 m2 AHSP PU A.4.7.1.4 Rp 32,599.60 Rp 1,785,154.10
3 Cat Kusen, Daun Pintu / Jendela / Papan Jelusi 81.24 m2 AHSP PU A.4.7.1.4 Rp 50,391.00 Rp 4,093,724.53
Sub Jumlah Rp 17,934,888.77
Pekerjaan Lantai 2
A PEKERJAAN BETON BERTULANG
1 Beton Bertulang Kolom K1- 30/30
Beton K-250 4.00 M3 AHSP PU A.4.1.1.8 Rp 1,155,388.67 Rp 4,616,933.14
Besi Tulangan Pokok ø 14 429.20 Kg AHSP PU A.4.1.1.17 Rp 19,737.30 Rp 8,471,295.90
Besi Tulangan Sengkang ø 8 - 10 cm 153.96 Kg AHSP PU A.4.1.1.17 Rp 19,737.30 Rp 3,038,774.86
Bekisting + Perawatan Beton 26.64 M2 AHSP PU A.4.1.1.22 Rp 597,542.00 Rp 15,918,518.88
2 Pek. Keramik
Pas. Keramik Lantai 40/40 77.78 m2 AHSP PU A.4.4.3.34.a Rp 290,851.00 Rp 22,621,692.74
Sub Jumlah Rp 97,318,852.25
D PEKERJAAN PINTU, JENDELA DAN KUNCI
1 Pas. Pintu P1
Kusen Pintu 0.17 m3 AHSP PU A.4.6.1.1 Rp 11,007,700.00 Rp 1,840,839.69
Daun Pintu 6.72 m2 AHSP PU A.4.6.1.5 Rp 834,350.00 Rp 5,606,832.00
Kusen Ventilasi 0.10 m3 AHSP PU A.4.6.1.1 Rp 11,007,700.00 Rp 1,057,795.94
Papan Ventilasi/Jelusi 0.06 m3 AHSP PU A.4.6.1.10 Rp 826,485.00 Rp 53,635.57
Kunci Pintu (Standar) 4.00 Buah AHSP PU A.4.6.2.4 Rp 245,355.00 Rp 981,420.00
Engsel Pintu 12.00 Buah AHSP PU A.4.6.2.5 Rp 53,372.00 Rp 640,464.00
Pacok Pintu 4.00 Buah Taksir Rp 15,000.00 Rp 60,000.00
2 Jendela J1
Kusen Jendela 0.17 m3 AHSP PU A.4.6.1.1 Rp 11,007,700.00 Rp 1,854,577.30
Daun Jendela 3.84 m2 AHSP PU A.4.6.1.6 Rp 623,700.00 Rp 2,395,008.00
- Kaca 5 mm 2.50 m2 AHSP PU A.6.2.17 Rp 159,797.00 Rp 399,876.01
Kusen Ventilasi 0.14 m3 AHSP PU A.4.6.1.1 Rp 11,007,700.00 Rp 1,545,481.08
Papan Ventilasi / Jelusi 0.14 m3 AHSP PU A.4.6.1.10 Rp 826,485.00 Rp 116,038.49
- Hak Angin / Gagang Jendela 16.00 Buah AHSP PU A.4.6.2.9 Rp 43,472.00 Rp 695,552.00
- Engsel Jendela 16.00 Buah AHSP PU A.4.6.2.6 Rp 53,372.00 Rp 853,952.00
- Pacok Jendela 8.00 Buah AHSP PU A.4.6.2.10 Rp 34,672.00 Rp 277,376.00
3 Jendela J2
Kusen Jendela 0.23 m3 AHSP PU A.4.6.1.1 Rp 11,007,700.00 Rp 2,500,244.95
Daun Jendela 5.76 m2 AHSP PU A.4.6.1.6 Rp 623,700.00 Rp 3,592,512.00
- Kaca 5 mm 3.75 m2 AHSP PU A.6.2.17 Rp 159,797.00 Rp 599,814.02
Kusen Ventilasi 0.19 m3 AHSP PU A.4.6.1.1 Rp 11,007,700.00 Rp 2,088,116.66
Papan Ventilasi / Jelusi 0.13 m3 AHSP PU A.4.6.1.10 Rp 826,485.00 Rp 107,271.14
- Hak Angin / Gagang Jendela 24.00 Buah AHSP PU A.4.6.2.9 Rp 43,472.00 Rp 1,043,328.00
- Engsel Jendela 24.00 Buah AHSP PU A.4.6.2.6 Rp 53,372.00 Rp 1,280,928.00
- Pacok Jendela 12.00 Buah AHSP PU A.4.6.2.10 Rp 34,672.00 Rp 416,064.00
Sub Jumlah Rp 30,007,126.85
E PEKERJAAN ATAP DAN PLAFOND
1 Rangka kuda-kuda baja ringan C-75 154.00 M2 TAKSIR Rp 300,000.00 Rp 46,200,000.00
2 Penutup Atap Genteng Metal 0,35 160.80 M2 AHSP PU A.4.5.2.32 Rp 127,655.00 Rp 20,526,924.00
3 Rabung Genteng Metal 0,30 20.00 M1 AHSP PU A.4.5.2.39.a Rp 40,095.00 Rp 801,900.00
4 Papan Listplank Uk. 2,5/25 cm 55.40 M1 AHSP PU A.4.6.1.21 Rp 131,835.00 Rp 7,303,659.00
5 Rangka Plafond Kayu Klas II 108.82 M2 AHSP PU A.4.6.1.20 Rp 138,792.50 Rp 15,102,733.65
6 Plafon Triplek 6 mm 108.82 M2 AHSP PU A.4.5.1.7 Rp 60,280.00 Rp 6,559,380.26
7 Kayu List Plafond 167.60 M1 AHSP PU A.4.5.1.9 Rp 24,453.00 Rp 4,098,322.80
Sub Jumlah Rp 100,592,919.70
F PEKERJAAN INSTALASI LISTRIK
1 Lampu Saving Energi 18 Watt 15.00 Bh Taksir Rp 23,000.00 Rp 345,000.000
3 Saklar Ganda 5.00 Bh Taksir Rp 15,000.00 Rp 75,000.000
4 Stop Kontak 5.00 Bh Taksir Rp 20,000.00 Rp 100,000.000
Sub Jumlah Rp 520,000.000
G PEKERJAAN PENGECATAN
1 Cat Dinding Luar Dan Dalam 418.61 M2 AHSP PU A.4.7.1.10 Rp 32,599.60 Rp 13,646,629.39
2 Cat Plafond 108.82 M2 AHSP PU A.4.7.1.4 Rp 32,599.60 Rp 3,547,331.99
3 Cat Kusen, Daun Pintu / Jendela / Papan Jelusi 84.45 M2 AHSP PU A.4.7.1.4 Rp 50,391.00 Rp 4,255,701.36
4 Cat Lisplank 2,5 x 25 110.80 M2 AHSP PU A.4.7.1.4 Rp 50,391.00 Rp 5,583,322.80
Sub Jumlah Rp 27,032,985.55
Sub Total Rp 862,998,217.15
BACK UP DATA VOLUME PEKERJAAN
A. PEKERJAAN PERSIAPAN
1. Pembersihan Lapangan
Lebar = 9.20 m (5.20+2+2)
Panjang = 22 m (18+2+2)
Luas = (PxL) 22.00
= ( 22 x 9.20 ) 202.40 M²
9.20
2. Pemasangan Bouwplank
Lebar = 7.20 m (5.20+1+1)
Panjang = 20 m (18+1+1)
Keliling = 2 (P + L ) 1.00
20.00
18.00 1.00
5.20 7.20
1.00
Volume = ( P x L x T ) x Unit
= (1.20 x 1.20 x 1.45) x 12 25.06 M³ 30
Ø8- 100
8 - Ø14
30
Lantai Keramik 40x40
Lebar = 1.2 m
Ø 8 - 100
5
PondasiTapak 8 Ø14 - 150
20
Jumlah = 12 Unit
5 110 5
120
Volume = ( P x L x T ) x Unit
= ( 1,2 x 1,2 x 0,05 ) x 12 Unit 0.86 M³
1.d. Aanstamping
Tinggi = 0.10 m
Lebar = 1.20 m
Panjang = 1.20 m
Jumlah = 12 Unit
Volume = ( P x L x T ) x Unit
= ( 1,2 x 1,2 x 0,10 ) x 12 Unit 1.73 M³
volume = ( P x L x T ) x Unit
= (0.30 x 0.30 x 1.15) x 12 1.242 M³
Tinggi = 0.23 m 5
30
110
120
5
Lebar = 1.10 m
Panjang = 1.10 m
Jumlah = 12 Unit
volume = ( P x L x T ) x Unit
= (1.10 x 1.10 x 0.23)x 12 3.27 M³
2.a. Galian Pondasi Menerus
Tinggi = 0.85 m
Lebar = 0.80 m
Panjang = 40.80 m 1 2 3 4 5 6
18.00
4.00 4.00 2.00 4.00 4.00
Volume = (PxLxT) B
5.20 5.20
2.00 I IV 2.00
Volume = (PxLxT)
= ( 60 x 1,00 x 0,05 ) 3.00 M³
2.d. Aanstamping
Tinggi = 0.10 m Lantai Keramik40x40
Spesi t=4cm
Aanstamping 10
LapisanPasir 5
40
10 80 10
100
Volume = (( a + b )/2 x P x T ))
= (( 0,40 + 0,80)/2 x 60 x 0,80) 28.80 M³
Volume = (PxLxT)
= (20.10 x 0.40 x 0.25) 2.010 M³
60
50
40
Tinggi = 0.05 m 10
5
Aanstamping
Lapisan Pasir
Lebar = 0.40 m
40 120
10 80 10
100
Panjang = 20.10 m
Volume = (PxLxT)
= ( 20.10 x 0.40 x 0.05 ) 0.402 M³
Volume = (PxLxT)
= ( 20.10 x 0.40 x 0.05 ) 1.206 M³
C. PEKERJAAN RAAM
1.a. Lantai kerja 1 : 3 : 5
Tinggi = 0.55 m
Lebar = 2.50 m
Alas = 1.20 m
Volume = ( 1/2 x A x T x L )
= ( 1/2 x 1.20 x 0.55 x 2.50) 0.825 M³ 120
55
80
Volume = (PxLxT)
= ( 4.00 x 0.70 x 0.15 ) 0.420 M³
2.a. Pasir Alas Tangga Depan
Tinggi = 0.05 m
Lebar = 0.70 m
Panjang = 4.00 m
Volume = (PxLxT)
= ( 4.00 x 0.70 x 0.05 ) 0.14 M³
90
3.a. Lantai kerja 1 : 3 : 5 30 30 30
10
Tinggi = 0.10 m
15
Lebar = 0.70 m
15 70
Panjang = 4.00 m
15
10
Volume = (PxLxT) 5
= ( 4.00 x 0.70 x 0.10) 0.28 M³ 70
Volume = (PxLxT)
= ( 4.00 x 0.30 x 0.10 ) 0.12 M³
Volume = (PxLxT)
= ( 4.00 x 0.30 x 0.25 ) 0.30 M³
Volume = (PxLxT)
= ( 4.00 x 0.17 x 0.10 ) 0.07 M³
Volume = (PxLxT)
= ( 4.00 x 0.08 x 0.10 ) 0.03 M³
B
Sloof 30/ 40 Sloof 30/ 40 Sloof 30/40 Sloof 30/ 40 Sloof 30/ 40
2.00 2.00
Sloof 30/ 40
Sloof 30/ 40
Sloof 30/ 40
Sloof 30/ 40
Sloof 30/ 40
Sloof 30/ 40
Tinggi = 0.40 m
1.20 1.20
0.30 0.30
0.30 1.20 0.30
0.30 0.30
2.00 2.50 2.00
Lebar = 0.30 m
Panjang = 60.00 m
Volume = (PxLxT)
= ( 60.00 x 0.30 x 0.40 ) 7.20 M³
Volume = ( P x L x T ) x Unit
= ( 0.30 x 0.30 x 3.60 ) x 12 3.89 M³
Tinggi = 3.70 m 30
30
Lebar = 0.30 m 30
Sloof 30/40
Panjang = 0.30 m
Kolom30/30
Jumlah = 12 Unit
Volume = ( P x L x T ) x Unit
30
30
30
18.00
4.00 4.00 2.00 4.00 4.00
Volume = ( P x L x T ) x Unit
B
K1 K1 K1 K1 K1 K1
2.00 2.00
KP KP KP KP KP KP
5.20 5.20
Volume = ( P x L x T ) x Unit
= ( 0.13 x 0.13 x 3.70 ) x 6 0.616512 M³
Jumlah = 10 Unit
Volume = ( P x L x T ) x Unit
= ( 0.13 x 0.13 x 0.87 ) x 12 0.15 M³
Volume = (PxLxT)
= ( 67,20 x 0.30 x 0.28 ) 5.64 M³ 40
40
Volume = (PxLxT)
= ( 18 x 0.20 x 0.28 ) 1.008 M³
Volume = ( P x L x T ) x Unit
= ( 3.70 x 3.70 x 0.12 ) x 4 6.57 M³
100
Ø
12-1
5 0
2
4
0 0
0 0
Ø
12-1
5 0 Ø
12-150
0 0
1
Jumlah = 4 unit
Volume = ( P x L x T ) x Unit
= ( 3.70 x0.95 x 0.12 ) x 4 1.69 M³
Volume = ( P x L x T ) x Unit
= ( 1.70 x 0.95 x 0.12 ) x 1 0.19 M³
Volume = ( P x L x T ) x Unit
= ( 32 x 0.13 x 0.20 ) x 8 6.66 M³
9.b. Balok Latai (BLT) (13/20) Lantai 2
Tinggi = 0.20 m
Lebar = 0.13 m
Panjang = 32 m
Jumlah = 8 unit
Volume = ( P x L x T ) x Unit
= ( 32 x 0.13 x 0.20 ) x 8 6.66 M³
Panjang = 18 m TopGevel13/15
Volume = ( P x L x T ) x Unit
= ( 32 x 0.13 x 0.20 ) x 8 0.30 M³
Volume = (PxLxT)
= ( 61 x 0.20 x 0.30 ) 3.66 M³
Ø12-200
130
Ø12-200
Ø12-200
130
Bordes Bordes
+ 2.05 +1.95
10 11 11
9 12 12
Volume = (P x L x T)
8 13 13
Ø12-200 Ø12-200
7 14 Ø12-200
400 Ø12-200 14
400
Ø12-200 Ø12-200
Ø12-200 6 15 Ø12-200 Ø12-200 15 Ø12-200
3 18
2 19
1 20
Naik Turun
±0.00 +4.00
F PEKERJAAN TANGGA
A A
Volume = (PxLxT)
= (6.49 x 1.00 x 0.12 ) 0.78 M³
Volume = (PxLxT)
= ( 6.60 x 0,15 x 0,20 ) 0.20 M³
20
Lebar = 1.00 m
Panjang = 1.30 m
Volume = (PxLxT)
= (1.30 x 1.00 x 0.32 ) 0.42 M³
Volume = (PxL)
= ( 2 .00 x 1.30 ) 2.86 M²
3.b. Keramik Anak Tangga
Panjang = 1.00 m
Lebar = 0.50 m
jumlah = 18 unit
Volume = ( P x L ) x unit
= ( 1.00 x 0.50 ) x 19 9.00 M²
Volume = P
= 33.81 33.81 M¹
Luas = (PxT)
= ( 53.02 x 0.40 ) 21.21 M²
Selasar
Tinggi = 0.50 m
Panjang = 20.40 m
Luas = (PxT)
= ( 20.40 x 0.50 ) 10.20 M²
Tangga
Tinggi = 0.60 m
Panjang = 2.00 m 5.20
Ringbalk20/ 30
4.00
= (2x2)x2 2.40 M²
Plafond+3.50
1.95
4.00
Lantai Keramik40 x40
2.05 Spesi t=4cm
CorLantai 1:3:6
Pasir urug
Tanah Urug
0.50
= ( 33.81 ) x 2 67.62 M²
Pintu P1
Tinggi = 0.40 m
Lebar = 0.92 m
Jumlah = 4 unit
Luas = ( L x T ) x unit
= ( 0.92 x 0.40 ) x 4 1.47 M²
Luas = (PxT )
= (53.02 x 3.20 ) 169.66 M²
2.a. Lantai 2 Pas. Dinding Bata 1 : 4
Tinggi = 3.70 m
Panjang = 53.02 m
Luas = (PxT)
Volume = ( 53.02 x 3.70 ) 196.17 M²
Luas = (PxT)
Volume = (18.57 x 0.87 ) 16.16 M²
Luas = ( P x T ) x unit
Volume = (1.20x 2.14 ) x 4 10.75 M²
Luas = ( L x T ) x unit
= ( 2,16 x 0.92 ) x 4 7.95 M²
Jendela J1
Tinggi = 0.92 m
Lebar = 1.38 m
Jumlah = 4 unit
Luas = ( L x T ) x unit
= ( 0.92 x 1.380 ) x 8 5.08 M²
B
6
Jendela J2 50 62
Tinggi = 0.92 m 6
Jumlah = 4 unit
Luas = ( L x T ) x unit
= ( 0.92 x 2.04 ) x 8 7.51 M² 216
Ventilasi P1 A A
Tinggi = 0.62 m
Lebar = 0.92 m
B 13
Jumlah = 4 unit
13
Luas = ( L x T ) x unit 6 80
92
6
Ventilasi J1
Tinggi = 0.62 m
Lebar = 1.38 m
Jumlah = 4 unit
Luas = ( L x T ) x unit
= ( 0.62 x 1.38 ) x 8 3.42 M²
Ventilasi J2
Tinggi = 0.62 m
Lebar = 2.04 m
Jumlah = 4 unit
Luas = ( L x T ) x unit
= ( 0.62 x 2.04 ) x 8 5.06 M²
Luas = ( L x T ) x unit
= ( 2,16 x 0.92 ) x 4 7.95 M²
6
Jendela J1 A A
80 92
Tinggi = 0.92 m
Lebar = 1.38 m
Jumlah = 4 unit 13
6
B
138
Luas = ( L x T ) x unit 13
Jendela J2
Tinggi = 0.92 m
Lebar = 2.04 m
Jumlah = 4 unit
Luas = ( L x T ) x unit
= ( 0.92 x 2.04 ) x 8 7.51 M²
Ventilasi P1
Tinggi = 0.62 m
Lebar = 0.92 m
Jumlah = 4 unit
Luas = ( L x T ) x unit
= ( 0.62 x 0.92 ) x 8 2.28 M²
Ventilasi J1
Tinggi = 0.62 m
Lebar = 1.38 m
Jumlah = 4 unit
Luas = ( L x T ) x unit
= ( 0.62 x 1.38 ) x 8 3.42 M²
Ventilasi J2 B
6
Tinggi = 0.62 m 51
Lebar = 2.04 m 51 6 55 67
Jumlah = 4 unit A
25
6
A
6
B 13
Luas = ( L x T ) x unit 13
Ventilasi V1
Tinggi = 1.34 m
Lebar = 0.42 m
Jumlah = 2 unit
Luas = ( L x T ) x unit
= ( 1.43 x 0.42 ) x 2 1.13 M²
18.00
4 5 6
A
1.20 18.04 0.92 1.20
Luas = (PxLxT)
= ( 3.70 x 1.70 x 0,40 ) 2.52 M³
Luas = ( P x L x T ) x unit
= ( 18.05 x 0.95 x 0,35 ) 6.00 M³
1 2 3 4 5 6
2.00
5.20
Luas = ( P x L x T ) x unit
= ( 2 x 2 x 0,35 ) 0.11 M²
Luas = ( P x L x T ) x unit
= ( 3,70 x 3,70 x 0,10 ) x 4 5.48 M³
Urugan Pasir dibawah tangga dalam ruangan
Tinggi = 0.10 m
Lebar = 1.70 m
Panjang = 3.70 m
Luas = (PxLxT)
= ( 3.70 x 1.70 x 0,10 ) 0.63 M³
1 2 3 4 5 6
2.00
5.20
0.30 0.30
0.30 1.20 0.30
0.30 0.30
2.00 2.50 2.00
Luas = (PxLxT)
= ( 18.05 x 0.95 x 0.10 ) 1.71 M³
Luas = ( P x L x T ) x unit
= ( 3,70 x 3,70 x 0,10 ) x 4 2.74 M³
Luas = (PxLxT)
= ( 3.70 x 1.70 x 0.05) 0.31 M³
1 2 3 4 5 6
2.00
5.20
0.30 0.30
0.30 1.20 0.30
0.30 0.30
2.00 2.50 2.00
Luas = (PxLxT)
= ( 18.05 x 0.95 x 0.05 ) 0.86 M³
Luas = ( P x L) x unit
= ( 3,87 x 3,87 ) x 4 59.91 M²
Luas = ( P x L)
= ( 3.87 x 1.89) 7.31 M²
Luas = (PxL)
= ( 18.13 x 1.14 ) 20.67 M²
2.00 2.00
M²
A
Luas = (PxL)
= ( 17.87 x 1.00 ) 17.87 M²
Pas. Keramik 40/40 Lantai, Selasar dan Ruangan Lt 2 77.78 M²
VI PEKERJAAN PINTU, JENDELA DAN KUNCI
Kusen Untuk Lantai 1
Kusen Pintu P1
Panjang = 5.36 m
Lebar = 0.13 m
Tinggi = 0.06 m
Jumlah = 4 unit
Luas = ( P x L x T ) x unit
= ( 5,36 x 0,13 x 0,06 ) x 4 0.17 M³
B
Daun Pintu P1 6
Panjang = 2.10 m 50 62
Lebar = 0.80 m 6
34
Panel
Panel 24
24
Buah = 3 Bh 8
Jumlah = 4 unit A A
Panel
3,5/8
24
24
Luas = ( Bh ) x unit 18
= (3)x4 12.00 Bh
B 13
3,5/10 Panel
13
Kunci Pintu P1 66 80 66
104
Buah = 1 Bh
Jumlah = 4 unit
Luas = ( Bh ) x unit
= (1)x4 4.00 Bh
Kusen Ventilasi P1
Panjang = 3.08 m
Lebar = 0.13 m
Tinggi = 0.06 m
Jumlah = 4 unit
Luas = ( P x L x T ) x unit
= ( 3.08 x 0,13 x 0,06 ) x 4 0.10 M³
Papan Ventilasi P1
Panjang = 6.24 m
Lebar = 0.13 m
Tinggi = 0.02 m
Jumlah = 4 unit
Luas = ( P x L x T ) x unit
= ( 6.24 x 0,13 x 0,02 ) x 4 0.06 M³
Kusen Jendela J1
Panjang = 5.40 m
Lebar = 0.13 m
Tinggi = 0.06
Jumlah = 4 unit
B
0.17
Balok 13/ 20
Kaca 5 MM Kaca5 MM
A A
80 92
Kaca Mati5 mm
3,5/ 8
6
B 13
13
66 60 6 60 66
150
B
6
Jelusi
50 62
Balok 13/ 20
Daun Jendela J1 A
Kaca 5 MM Kaca5 MM
A
80 92
3,5/ 8
Lebar = 0.60 m
6
B 13
Jumlah = 8 unit 66 60 6 60 66
13
150
Luas = ( P x L ) x unit
= ( 0.80 x 0.60 ) x 8 3.84 M²
Kaca Jendela J1
Panjang = 0.68 m
Lebar = 0.46 m
Jumlah = 8 unit
Luas = ( P x L ) x unit
= ( 0.68 x 0.46 ) x 8 2.50 M²
Engsel Jendela J1
Buah = 4 Bh
Jumlah = 4 unit
Luas = ( Bh ) x unit
= (4)x4 16.00 Bh
Pacok Jendela J1
Buah = 2 Bh
Jumlah = 4 unit
Luas = ( Bh ) x unit
= (2)x4 8.00 Bh
Luas = ( Bh ) x unit
= (4)x4 16.00 Bh
Kusen Ventilasi J1
Panjang = 4.50 m
Lebar = 0.13 m
Tinggi = 0.06
Jumlah = 4 unit
Luas = ( P x L x T ) x unit
= ( 4.50x 0,13 x 0,06 ) x 4 0.14 M³
Papan Ventilasi J1
Panjang = 8.32 m
Lebar = 0.13 m
Tinggi = 0.02 m
Jumlah = 4 unit
Luas = ( P x L x T ) x unit
= ( 8.32 x 0,13 x 0,02 ) x 4 0.09 M³
Kusen Jendela J2
Panjang = 7.28 m
Lebar = 0.13 m
Tinggi = 0.06 m
Jumlah = 4 unit
Luas = ( P x L x T ) x unit
= ( 7.28 x 0,13 x 0,06 ) x 4 0.23 M²
Daun Jendela J2
Panjang = 0.80 m
Lebar = 0.60 m
Jumlah = 12 unit
Luas = ( P x L ) x unit
= ( 0.80 x 0.60 ) x 12 5.76 M²
Kaca Jendela J2
Panjang = 0.68 m
Lebar = 0.46 m
Jumlah = 12 unit
Luas = ( P x L ) x unit
= ( 0.68 x 0.46 ) x 12 3.75 M²
Engsel Jendela J2
Buah = 6 Bh
Jumlah = 4 unit
B
Luas = ( Bh ) x unit 6
Buah = 3 Bh 6
Luas = ( Bh ) x unit
3,5/ 8
= (3)x4 12.00 Bh B 13
6
66 60 6 60 6 60 66
Buah = 6 Bh 216
Jumlah = 4 unit
Luas = ( Bh ) x unit
= (6)x4 24.00 Bh
Kusen Ventilasi J2
Panjang = 6.08 m
Lebar = 0.13 m
Tinggi = 0.06 m
Jumlah = 4 unit
Luas = ( P x L x T ) x unit
= ( 6.08 x 0,13 x 0,06 ) x 4 0.19 M²
Papan Ventilasi J2
Panjang = 12.48 m
Lebar = 0.13 m
Tinggi = 0.02 m
Jumlah = 4 unit
Luas = ( P x L x T ) x unit
= ( 12.48 x 0,13 x 0,02 ) x 4 0.13 M³
Luas = ( P x L x T ) x unit
= ( 5,36 x 0,13 x 0,06 ) x 4 0.17 M³
Daun Pintu P1
Panjang = 2.10 m
Lebar = 0.80 m
Jumlah = 4 unit
Engsel Pintu P1
Buah = 3 Bh
Jumlah = 4 unit
Luas = ( Bh ) x unit
= (3)x4 12.00 Bh
Kunci Pintu P1
Buah = 1 Bh
Jumlah = 4 unit
Luas = ( Bh ) x unit
= (1)x4 4.00 Bh
Kusen Ventilasi P1
Panjang = 3.08 m
B
Lebar = 0.13 m 6
Jumlah = 4 unit
Balok 13/20
3,5 / 8
6
Papan Ventilasi P1 B
3,5 / 8
13
KacaMati5 mm
Panjang = 6.24 m 13
Lebar = 0.13 m 66 60 6
150
60 66
Tinggi = 0.02 m
Jumlah = 4 unit
Luas = ( P x L x T ) x unit
= ( 6.24 x 0,13 x 0,02 ) x 4 0.06 M³
Kusen Jendela J1
Panjang = 5.40 m
Lebar = 0.13 m
Tinggi = 0.06
Jumlah = 4 unit
Luas = ( P x L x T ) x unit
= ( 5,40 x 0,13 x 0,06 ) x 4 0.17 M²
Daun Jendela J1
Panjang = 0.80 m
Lebar = 0.60 m
Jumlah = 8 unit
Luas = ( P x L ) x unit
= ( 0.80 x 0.60 ) x 8 3.84 M²
Kaca Jendela J1
Panjang = 0.68 m
Lebar = 0.46 m
Jumlah = 8 unit
Luas = ( P x L ) x unit
= ( 0.68 x 0.46 ) x 8 2.50 M²
Engsel Jendela J1
Buah = 4 Bh
Jumlah = 4 unit
Luas = ( Bh ) x unit
= (4)x4 16.00 Bh
Pacok Jendela J1
Buah = 2 Bh
Jumlah = 4 unit
Luas = ( Bh ) x unit
= (2)x4 8.00 Bh
Luas = ( Bh ) x unit
= (4)x4 16.00 Bh
Kusen Ventilasi J1
Panjang = 4.50 m
Lebar = 0.13 m
Tinggi = 0.06
Jumlah = 4 unit
Luas = ( P x L x T ) x unit
= ( 4.50x 0,13 x 0,06 ) x 4 0.14 M²
Papan Ventilasi J1
Panjang = 8.32 m
Lebar = 0.13 m
Tinggi = 0.02 m
Jumlah = 4 unit
Luas = ( P x L x T ) x unit
= ( 8.32 x 0,13 x 0,02 ) x 4 0.09 M³
Kusen Jendela J2
Panjang = 7.28 m
Lebar = 0.13 m
Tinggi = 0.06
Jumlah = 4 unit
Luas = ( P x L x T ) x unit
= ( 7.28 x 0,13 x 0,06 ) x 4 0.23 M²
Daun Jendela J2
Panjang = 0.80 m
Lebar = 0.60 m
Jumlah = 12 unit
Luas = ( P x L ) x unit
= ( 0.80 x 0.60 ) x 12 5.76 M²
Kaca Jendela J2
Panjang = 0.68 m
Lebar = 0.46 m
Jumlah = 12 unit
B
Luas = ( P x L ) x unit 6
Buah = 6 Bh 6
Luas = ( Bh ) x unit
3,5 / 8
= (6)x4 24.00 Bh B 13
6
Pacok Jendela J2 13
66 60 6 60 6 60 66
Buah = 3 Bh 216
Jumlah = 4 unit
Luas = ( Bh ) x unit
= (3)x4 12.00 Bh
Luas = ( Bh ) x unit
= (6)x4 24.00 Bh
Kusen Ventilasi J2
Panjang = 6.08 m
Lebar = 0.13 m
Tinggi = 0.06
Jumlah = 4 unit
Luas = ( P x L x T ) x unit
= ( 6.08 x 0,13 x 0,06 ) x 4 0.19 M²
B
51 6
Papan Ventilasi J2
51 6 55 67
Panjang = 12.48 m A
25
A
Lebar 0.13 m
6 6
= B 13
Tinggi = 0.02 m 6 6 30 6 6 6 6 30 6 6
13
Jumlah = 4 unit 54 54
Luas = ( P x L x T ) x unit
= ( 12.48 x 0,13 x 0,02 ) x 4 0.13 M³
Kusen Ventilasi V1
Panjang = 1.97 m
Lebar = 0.13 m
Tinggi = 0.06
Jumlah = 4 unit
Luas = ( P x L x T ) x unit
= ( 1,97 x 0,13 x 0,06 ) x 4 0.06 M²
Papan Ventilasi V1
Panjang = 1.83 m
Lebar = 0.13 m
Tinggi = 0.02 m
Jumlah = 4 unit
Luas = ( P x L x T ) x unit
= ( 1.83 x 0,13 x 0,02 ) x 4 0.02 M³
Panjang = 20.00 m
Balokbint baja ringan galvanized
0.60
4.0 2 0.60
Lebar = 3.85 m
0.60
0.6 0
0.60
Volume = (PxL)
= ( 20.00 x 3.85 ) x 2 154.00 M2
Volume = (PxL)
= ( 20 x 4.02 ) x 2 160.80 M2
20.00
Panjang = 20 m
Jumlah = 1.00 Unit
Volume = (PxU)
= ( 20 ) x 1 20.00 M¹
Volume = (PxU)
= ( 55 ) x 1 55.40 M¹
2.00
5.20
1.20
Volume = (PxL)
= ( 16.59 x 3.70 ) 61.38 M²
Rangka Plafond Lantai 2 (luar ruangan)
Panjang = 18.20 m
Lebar = 2.24 m
Volume = (PxL)
20.00
6.50
Volume = (PxL)
= ( 18.33 x 2.24 ) 6.66 M²
Volume = P
= 167.6 167.60 M²
Cat Kolom Lt 1
Panjang = 3.60 m
Lebar = 0.84 m
Jumlah = 12.00 Unit
Volume = ( P x L ) x Unit
= ( 7,20 x 0,40 ) x 12 36.29 M²
Volume = ( P x L ) x Unit
= ( 56,80 x 0,50 ) x 2 56.80 M²
Cat Kolom Lt 2
Panjang = 3.70 m
Lebar = 0.84 m
Jumlah = 12.00 Unit
Volume = ( P x L ) x Unit
= ( 7,20 x 0,40 ) x 12 37.30 M²
Volume = (PxL)
= ( 18 x 4 ) x 1 54.76 M²
Cat Plafond Lantai 2 (ruangan)
Panjang = 16.59 m
Lebar = 3.70 m
Volume = (PxL)
= ( 16.59 x 3.70 ) 61.38 M²
Volume = (PxL)
= ( 18.20 x 2.24 ) 40.77 M²
20.00
1.20 1.20
0.60 0.60
6.50
Volume = (PxL)
= ( 18.33 x 2.24 ) 6.66 M²
Volume = (PxU)
= ( 55 ) x 2 110.80 M¹
Luas = ( P x L) x unit
= ( 5,24 x 0,25 ) x 4 5.24 M²
B
6
Jumlah = 4 unit 6
34
Panel
Panel 24
Cat Kusen Ventilasi P1 210
3,5/8 8 216
Panjang = 2.84 m 24
Lebar = 0.25 m 8
Panel 24
Jumlah = 4 unit A A 3,5/8 8
24
Luas = ( P x L) x unit 18
3,5/10 Panel
66 80 66
Panjang = 6.24 m 104
Lebar = 0.17 m
Jumlah = 4 unit
Luas = ( P x L ) x unit
= ( 6.24 x 0,17) x 4 4.24 M²
Luas = ( P x L) x unit
= ( 5,08 x 0,25 ) x 4 5.08 M²
Luas = ( P x L) x unit
= ( 2.80 x 0,22 ) x 4 2.99 M²
6
Cat Kusen Jendela J2
Panjang = 7.28 m A
Kaca5 MM Kaca 5MM
A
80 92
Lebar = 0.25 m
Kaca Mati 5mm
Jumlah = 4 unit
3,5 / 8
6
B 13
KacaMati5 mm 3,5 / 8
13
Luas = ( P x L) x unit 66 60 6 60 66
150
Luas = ( P x L) x unit
= ( 2.80 x 0,22 ) x 4 3.52 M²
Luas = ( P x L) x unit
= ( 4.76 x 0,25 ) x 4 4.76 M²
Luas = ( P x L) x unit
= ( 12.48 x 0.17) x 4 8.49 M²
6
= ( 5,24 x 0,25 ) x 4 5.24 M²
Kaca 5 MM Kaca 5 MM Kaca5 MM
A A
80 92
Cat Daun Pintu P1 Kaca Mati 5mm
13
66 60 6 60 6 60 66
Luas = ( P x L) x unit
= ( 2.84 x 0.25) x 4 2.84 M²
Luas = ( P x L ) x unit
= ( 6.24 x 0,17) x 4 4.24 M²
Luas = ( P x L) x unit
= ( 5,08 x 0,25 ) x 4 5.08 M²
Cat Daun Jendela J1
Panjang = 3.40 m
Lebar = 0.22 m
Jumlah = 4 unit
Luas = ( P x L) x unit
= ( 2.80 x 0,22 ) x 4 2.99 M² B
6
Panjang = 4.26 m
Balok 13/20
Lebar = 0.25 m 6
Jumlah = 4 unit A
Kaca 5MM Kaca 5MM
A
80 92
KacaMati5 mm
13
Panjang = 8.32 m
Lebar = 0.17 m
Jumlah = 4 unit
Luas = ( P x L) x unit
= ( 8.32 x 0.17) x 4 5.66 M²
Luas = ( P x L) x unit
= ( 7.28 x 0,25 ) x 4 7.28 M²
Luas = ( P x L) x unit
= ( 2.80 x 0,22 ) x 4 3.52 M²
Luas = ( P x L) x unit
= ( 4.76 x 0,25 ) x 4 4.76 M²
Luas = ( P x L) x unit
51 6 55 67
Panjang = 1.97 m 54 54
Lebar = 0.25 m
Jumlah = 4 unit
Luas = ( P x L ) x unit
= ( 1,97 x 0,25 ) x 4 1.97 M²
Luas = ( P x L x T ) x unit
= ( 1.83 x 0,17) x 4 1.24 M²
1 2 3
40
Berat besi Ø 8, = Byk begel x Pjg begel x 0.006165 x dia.2
30 = 41.429 kg
Sloof30/40
1 2 3
13
13
Berat besi Ø 8, = Byk begel x Pjg begel x 0.006165 x dia.2
Kolom13/13 = 57.6649 kg
1 2 3
BalokBlt 13/13
4. Papan mal = Pjg balok untuk 1 m3 beton x luas permukaan papan
= 23.08 m2 -------> 50%
RingBalok 20/ 30 4. Papan mal = Pjg balok untuk 1 m3 beton x luas permukaan papan
= 13.33 m2 -------> 50%
1 2 3
Top Gevel13/15
= 22.05 m2 -------> 50%
100
Ø
12-150
200
400
Ø1
2 -1
5 0 Ø
12-150
100
= 769.018 Kg
1 2 3
1 2 3
D14 -150
8-D16-150 30 120
Berat besi Ø 14, = Pjg*Jb*Jl*0.006162*d*d
0
0
5
5
-1
5
-1
-1
4
4
1
4
1
1
D
30
D14 -150
= 23.189 Kg
120
8 - Ø14
Ø8 - 100
8 Ø14 - 150
5
20
4. Papan mal = Pjg balok untuk 1 m3 beton x luas permukaan papan
= 13.33 m2 -------> 50%