BQ Struktur Balai Pustaka
BQ Struktur Balai Pustaka
RAB
Note :
Ppn sudah masuk diharga satuan.
Direktur Utama
RENCANA ANGGARAN BIAYA
PROYEK : COMMERCIAL BUILDING
LOKASI : JL. BALAI PUSTAKA TIMUR NO.7
RAWAMANGUN - JAKARTA TIMUR
HARGA JUMLAH
NO. URAIAN PEKERJAAN VOLUME SAT.
SATUAN HARGA
SUB TOTAL -
RENCANA ANGGARAN BIAYA
PROYEK : COMMERCIAL BUILDING
LOKASI : JL. BALAI PUSTAKA TIMUR NO.7
RAWAMANGUN - JAKARTA TIMUR
RAB
NO. URAIAN PEKERJAAN VOLUME SAT. HARGA SATUAN JUMLAH HARGA KETERANGAN
A. PEKERJAAN STRUKTUR
SUB TOTAL -
SUB TOTAL -
A. Lantai 1
1 Beton Pile cap 43.61 m3 - -
Bekisting Batako 106.01 m2 - -
Pembesian 4,895.82 kg - -
2 Beton Tie beam 21.72 m3 - -
Bekisting Batako 166.97 m2 - -
Bekisting Multipleks 41.04 m2 - -
Pembesian 5,535.64 kg - -
3 Beton Plat lantai S1 t = 15 cm 78.28 m3 - -
Bekisting Multipleks 70.12 m2 - -
Pembesian 8,842.32 kg - -
4 Beton Kolom 24.35 m3 - -
Bekisting Multipleks 237.08 m2 - -
Pembesian 6,275.89 kg - -
5 Beton Tangga Type 1 (Tangga Depan) 2.77 m3 - -
Bekisting Multipleks 19.17 m2 - -
Pembesian 553.15 kg - -
6 Beton Tangga Type 2 (Tangga Belakang) 1.48 m3 - -
Bekisting Multipleks 12.77 m2 - -
Page 3 of 7
RAB
NO. URAIAN PEKERJAAN VOLUME SAT. HARGA SATUAN JUMLAH HARGA KETERANGAN
Pembesian 296.01 kg - -
B. Lantai 2
1 Beton Plat lantai S2 t = 12 cm 57.92 m3 - -
Bondek t. 0,75mm 482.67 m2 - -
Wiremesh M-8 (Single) 482.67 m2 - -
Shear Connector 260.88 m1 - -
2 Beton Kolom 4.89 m3 - -
Bekisting Multipleks 47.63 m2 - -
Pembesian 2,586.25 kg - -
3 Beton Tangga Type 1 (Tangga Depan) 2.99 m3 - -
Bekisting Multipleks 20.63 m2 - -
Pembesian 597.15 kg - -
4 Beton Tangga Type 2 (Tangga Belakang) 1.63 m3 - -
Bekisting Multipleks 12.77 m2 - -
Pembesian 326.04 kg - -
C. Lantai 3
1 Beton Plat lantai S2 t = 12 cm 57.92 m3 - -
Bondek t. 0,75mm 482.67 m2 - -
Wiremesh M-8 (Single) 482.67 m2 - -
Shear Connector 260.88 m1 - -
2 Beton Tangga Type 1 (Tangga Depan) 2.88 m3 - -
Bekisting Multipleks 19.91 m2 - -
Pembesian 575.46 kg - -
3 Beton Tangga Type 2 (Tangga Belakang) 1.56 m3 - -
Bekisting Multipleks 12.19 m2 - -
Pembesian 311.02 kg - -
D. Lantai 4
1 Beton Plat lantai S2 t = 12 cm 57.87 m3 - -
Bondek t. 0,75mm 482.21 m2 - -
Wiremesh M-8 (Single) 482.21 m2 - -
Shear Connector 242.71 m1 - -
2 Beton Tangga Type 1 (Tangga Depan) 2.88 m3 - -
Bekisting Multipleks 19.91 m2 - -
Pembesian 575.46 kg - -
3 Beton Tangga Type 2 (Tangga Belakang) 1.56 m3 - -
Bekisting Multipleks 12.19 m2 - -
Pembesian 311.02 kg - -
E. Lantai 5
1 Beton Plat lantai S2 t = 12 cm (+ Waterproof Integral) 57.87 m3 - -
Bondek t. 0,75mm 482.21 m2 - -
Wiremesh M-8 (Single) 482.21 m2 - -
Shear Connector 242.71 m1 - -
F. Atap Tangga
1 Beton Plat lantai S2 t = 12 cm (+ Waterproof Integral) 8.57 m3 - -
Bondek t. 0,75mm 71.45 m2 - -
Wiremesh M-8 (Single) 71.45 m2 - -
Shear Connector 43.42 m1 - -
H. STP / Septictank
1 Beton Plat lantai t = 50 cm (+ Waterproof Integral) 13.99 m3 - -
Bekisting Batako 11.13 m2 - -
Pembesian 842.26 kg - -
2 Beton Dinding (+ Waterproof Integral) 11.13 m3 - -
Bekisting Multipleks 111.30 m2 - -
Pembesian 1,359.62 kg - -
Page 4 of 7
RAB
NO. URAIAN PEKERJAAN VOLUME SAT. HARGA SATUAN JUMLAH HARGA KETERANGAN
Waterstop 19.74 m1 - -
3 Beton Plat Tutup t = 15 cm (+ Waterproof Integral) 3.25 m3 - -
Bekisting Multipleks 21.68 m2 - -
Pembesian 505.66 kg - -
I. Pit Lift
1 Beton Plat lantai t = 15 cm (+ Waterproof Integral) 0.87 m3 - -
Bekisting Batako 9.87 m2 - -
Pembesian 174.46 kg - -
2 Beton Dinding (+ Waterproof Integral) 1.48 m3 - -
Bekisting Multipleks 18.26 m2 - -
Pembesian 241.14 kg - -
Waterstop 9.87 m1 - -
J. Pondasi Genset
1 Beton Plat lantai t = 30 cm (+ Waterproof Integral) 2.32 m3 - -
Bekisting Batako 3.91 m2 - -
Pembesian 268.31 kg - -
SUB TOTAL -
A. LANTAI 2
B. LANTAI 3
Page 5 of 7
RAB
NO. URAIAN PEKERJAAN VOLUME SAT. HARGA SATUAN JUMLAH HARGA KETERANGAN
C. LANTAI 4
D. LANTAI 5
E. ATAP TANGGA
Page 6 of 7
RAB
NO. URAIAN PEKERJAAN VOLUME SAT. HARGA SATUAN JUMLAH HARGA KETERANGAN
SUB TOTAL -
V. PEKERJAAN LAIN-LAIN
SUB TOTAL -
T O T A L -