HARGA SATUAN MATERIAL UNTUK PEKERJAAN CIVIL

NO MATERIAL SPESIFIKASI SATUAN HARGA

Benang Nylon Rol


Kawat Beton/Bendrat kg

Pasir Pasang M³
Pasir Urug M³
Pasir Beton/Cor M³
Split M³
Kerikil/koral M³
Sirtu M³
Batu Kali M³
Semen PC Type 1 @ 50 Kg Zak
Semen Tahan Api @ 50 Kg Zak
Semen Putih Zak
Grouting M³
Aspal Drum
Sika - Sikafume kg
Sika - Sikament LN kg
Sika - Chapdur kg

Kayu kelas I M³
Kayu kelas II M³
Tiang Kayu Ø 150 - 4 m Btg -
Kayu Balok 10/10 - 4 m Btg -
Kayu Balok 10/15 - 4 m Btg -
Kayu Balok 3/5 - 4 m Btg -
Kayu Balok 4/6 - 4 m Btg -
Kayu Balok 5/10 - 4 m Btg -
Kayu Balok 5/15 - 4 m Btg -
Kayu Balok 5/5 - 4 m Btg -
Kayu Balok 5/7 - 4 m Btg -
Kayu Balok 6/15 - 4 m Btg -
Kayu Papan 2/12 - 4 m Btg -
Kayu Papan 2/20 - 4 m Btg -
Kayu Papan 3/22 - 4 m Btg -
Kayu Papan 3/25 - 4 m Btg -
Kayu Papan 3/30 - 4 m Btg -
Kayu Papan 4/20 - 4 m Btg -
Kayu Papan 5/20 - 4 m Btg -
Triplek 4 mm M²
Multiplek 8 mm M²
Tacon M²
List Profil 50 mm M'
Paku 2" Kg
Paku 2,5" Kg
Paku 3" Kg
Paku 4" Kg
Paku 5" Kg

1(253) Satuan Material


515379445.xls

NO MATERIAL SPESIFIKASI SATUAN HARGA

Paku Triplek Kg
Kawat Nyamuk M²

Keramik 40 x 40 cm Roman KW 1 Dus


Keramik 33 x 33 cm Heavy Duty Dus
Keramik 30 x 30 cm Roman KW 1 Dus
Keramik 20 x 20 cm Roman KW 1 Dus
Keramik 10 x 20 cm Roman KW 1 Dus
Keramik 20 x 40 cm Roman KW 1 Dus
Keramik 10 x 40 cm Roman KW 1 Dus

Kaca Bening 5 mm M²
Kaca Rayban 5 mm M²
Kaca Buram / Es 5 mm M²

Bata 5 x 10 x 20 cm Bh
Rooster 5 x 10 x 20 cm Bh
Bata Tahan Api 6 x 11,4 x 23 cm Bh
Conblock Bh

Cat Baja Kg -
Cat Meni Besi Kg -
Cat Meni Kayu Kg
Cat Minyak Kg
Cat Tembok Kg -
Cat Plamir Kg -
Coalter/Residu Kg
Dempul Kayu Kg
Solar Liter
Thinner Liter

Penutup Atap Spandek M²


Rabung Spandek M'
Clading Trimdek M²
Flashing M'
Corner Flashing M'
Flashing Talang M'
Tapping Screw Bh
Penutup Atap Multi Roof M²
Rabung Multi Roof M'
Nok Samping Multi Roof M'

Rangka Atap Multi Truss M²


Profil C 75.100 Taso m' -
Profil C 75.80 Taso m' -
Profil C 75.75 Taso m' -
Reng Profil U 30.45 Taso m' -
Talang Jurai Profil C 75.75 m' -
Dynabolt 12 - 120 mm Bh

Pipa PVC Ø 1" AW - 4 m Btg


Pipa PVC Ø 3/4" AW - 4 m Btg
Pipa PVC Ø 1/2" AW - 4 m Btg

2(253) Satuan Material


515379445.xls

NO MATERIAL SPESIFIKASI SATUAN HARGA

Pipa PVC Ø 4" D - 4 m Btg


Pipa PVC Ø 3" D - 4 m Btg
Pipa PVC Ø 2" D - 4 m Btg
Pipa PVC Ø 1-1/4" D - 4 m Btg
Pipa PVC Ø 1-1/2" D - 4 m Btg
Urinoir Toto Bh
Closet Duduk Toto Bh
Closet Jongkok Toto Bh
Floor Drain Bh
Keran Air Bh
Kran Air Stainless Steel 1/2" Leher Angsa Bh
Kran Air Stainless Steel 1/2" Bh
Tempat Sabun Toto Bh
Wastafel Toto Bh
Cermin M²
Kitchen Zinch 1 Lubang Bh
Kitchen Zinch 2 Lubang Bh

Kabel NYA 1 x 1.5 mm Rol


Isolator Plastik Bh
Paku Asbes 2,5" + Karet Bh
Isolasi Unibel Rol
Benang Kasur Rol
Saklar Gantung Broco Bh
Saklar Ganda Broco Bh
Saklar Tunggal Broco Bh
Stop Kontak Broco - Inbow Bh
Stop Kontak AC Bh

Lampu Pijar 25 Watt Philip Bh


Lampu TL 10 Watt Philip Bh
Lampu TL 20 Watt Philip Bh
Lampu TL 40 Watt Philip Bh
Lampu TL 18 Watt Philip Bh
Lampu TL 36 Watt Philip Bh
Lampu TL 2X20 Watt Philip Bh
Lampu TL 2X40 Watt Philip Bh
Lampu TL 2X18 Watt Philip Bh
Lampu TL 2X36 Watt Philip Bh
Lampu SL 12 Watt Philip Bh
Lampu SL 15 Watt Philip Bh
Air Conditioning 1/2 PK Bh
Air Conditioning 3/4 PK Bh
Air Conditioning 1 PK Bh
Air Conditioning 1-1/2 PK Bh
Air Conditioning 2 PK Bh
Exhaust Fan Bh
Arde Copper Rod Ø 19 mm u/ jembatang timbang M'

Kunci Tanam 2 slot SES, Kuningan Bh


Handel 2 Pintu Bh
Kunci Pintu Toilet Bh
Engsel 4" Arch, Kuningan Bh

3(253) Satuan Material


515379445.xls

NO MATERIAL SPESIFIKASI SATUAN HARGA

Engsel 3" Arch, Kuningan Bh


Engsel Pintu Ø 19 Bh
Grendel Tanam Ø 16 mm Bh
Grendel Tanam 8" Kuningan Bh
Grendel 6" Kuningan Bh
Grendel 3" Kuningan Bh
Grendel 2" Kuningan Bh
Pegangan Pintu 4" Kuningan Bh
Pegangan Jendela 3" Kuningan Bh
Hak Angin Kuningan Bh
Roller Pintu Ø 60 mm Bh
Roda Pintu Ø 80 mm Bh
Roda Pintu Ø 100 mm Bh
Roda Pintu Ø 200 mm Bh
Bearing Sliding Door Bh

Pelat Aluminium u/ pintu Toilet M²


Profil Aluminium 4" x 1 3/4" m'
Profil Aluminium 3" x 1 1/2" m'
Profil Daun Pintu Floor Hinge m'
Profil Daun Pintu Swing m'
Profil Daun Pintu Sliding m'
Profil Kusen Jendela m'
Profil Daun Jendela m'
Profil Partisi m'

MS - CNP 200X75X20X3.2 Kg
MS - CNP 150X65X20X3.2 Kg -
MS - CNP 150X50X20X3.2 Kg -
MS - CNP 150X50X20X2.3 Kg -
MS - CNP 125X50X20X3.2 Kg -
MS - CNP 125X50X20X2.3 Kg -
MS - CNP 100X50X20X3.2 Kg -
MS - CNP 100X50X20X2.3 Kg -
MS - CNP 100X50X20X1.6 Kg -
MS - CNP 75X45X15X2.3 Kg -
MS - CNP 75X45X15X1.6 Kg -
MS - CNP 60X30X10X1.6 Kg -

MS - L 20X20X3 Kg -
MS - L 25X25X3 Kg -
MS - L 25X25X5 Kg -
MS - L 30X30X3 Kg -
MS - L 40X40X3 Kg -
MS - L 40X40X4 Kg -
MS - L 40X40X5 Kg -
MS - L 45X45X4 Kg -
MS - L 45X45X5 Kg -
MS - L 50X50X4 Kg -
MS - L 50X50X5 Kg -
MS - L 50X50X6 Kg -
MS - L 60X60X5 Kg -
MS - L 60X60X6 Kg -

4(253) Satuan Material


515379445.xls

NO MATERIAL SPESIFIKASI SATUAN HARGA

MS - L 65X65X6 Kg -
MS - L 70X70X6 Kg -
MS - L 70X70X7 Kg -
MS - L 75X75X6 Kg -
MS - L 75X75X7 Kg -
MS - L 75X75X8 Kg -
MS - L 80X80X8 Kg -
MS - L 90X90X8 Kg -
MS - L 90X90X9 Kg -
MS - L 90X90X10 Kg -
MS - L 100X100X8 Kg -
MS - L 100X100X10 Kg -
MS - L 120X120X11 Kg -
MS - L 125X125X12 Kg -
MS - L 130X130X9 Kg -
MS - L 130X130X12 Kg -
MS - L 150X150X12 Kg -
MS - L 150X150X15 Kg -
MS - L 200X200X15 Kg -
MS - L 200X200X20 Kg -
MS - L 200X200X25 Kg -
MS - L 250X250X25 Kg -

MS - PELAT BORDES 4.5 mm Kg -


MS - PELAT BORDES 6 mm Kg -
EXPANDED METAL M²

MS - PELAT 1.2 mm Kg -
MS - PELAT 1.4 mm Kg -
MS - PELAT 1.5 mm Kg -
MS - PELAT 1.9 mm Kg -
MS - PELAT 2 mm Kg -
MS - PELAT 2.3 mm Kg -
MS - PELAT 2.6 mm Kg -
MS - PELAT 2.8 mm Kg -
MS - PELAT 2.9 mm Kg -
MS - PELAT 3 mm Kg -
MS - PELAT 3.2 mm Kg -
MS - PELAT 4 mm Kg -
MS - PELAT 4.5 mm Kg -
MS - PELAT 5 mm Kg -
MS - PELAT 6 mm Kg -
MS - PELAT 8 mm Kg -
MS - PELAT 9 mm Kg -
MS - PELAT 10 mm Kg -
MS - PELAT 12 mm Kg -
MS - PELAT 13 mm Kg -
MS - PELAT 15 mm Kg -
MS - PELAT 16 mm Kg -
MS - PELAT 18 mm Kg -
MS - PELAT 19 mm Kg -
MS - PELAT 20 mm Kg -
MS - PELAT 21 mm Kg -

5(253) Satuan Material


515379445.xls

NO MATERIAL SPESIFIKASI SATUAN HARGA

MS - PELAT 22 mm Kg -
MS - PELAT 25 mm Kg -
MS - PELAT 28 mm Kg -
MS - PELAT 30 mm Kg -
MS - PELAT 32 mm Kg -
MS - PELAT 38 mm Kg -
MS - PELAT 40 mm Kg -
MS - PELAT 50 mm Kg -
MS - PELAT 65 mm Kg -
MS - PELAT 75 mm Kg -
MS - PELAT 100 mm Kg -

MS - PELAT STRIP 3 X 19 MM Kg -
MS - PELAT STRIP 3 X 25 MM Kg -
MS - PELAT STRIP 3 X 30 MM Kg -
MS - PELAT STRIP 4 X 19 MM Kg -
MS - PELAT STRIP 4 X 25 MM Kg -
MS - PELAT STRIP 4 X 30 MM Kg -
MS - PELAT STRIP 4 X 38 MM Kg -
MS - PELAT STRIP 5 X 19 MM Kg -
MS - PELAT STRIP 5 X 25 MM Kg -
MS - PELAT STRIP 5 X 30 MM Kg -
MS - PELAT STRIP 5 X 38 MM Kg -
MS - PELAT STRIP 5 X 50 MM Kg -
MS - PELAT STRIP 6 X 150 MM Kg -
MS - PELAT STRIP 8 X 38 MM Kg -
MS - PELAT STRIP 9 X 125 MM Kg -
MS - PELAT STRIP 9 X 150 MM Kg -

MS - SQ BAR - 9X9 MM Kg -
MS - SQ BAR - 12X12 MM Kg -
MS - SQ BAR - 16X16 MM Kg -
MS - SQ BAR - 19X19 MM Kg -
MS - SQ BAR - 22X22 MM Kg -
MS - SQ BAR - 25X25 MM Kg -
MS - SQ BAR - 28X28 MM Kg -
MS - SQ BAR - 32X32 MM Kg -
MS - SQ BAR - 38X38 MM Kg -
MS - SQ BAR - 44X44 MM Kg -
MS - SQ BAR - 50X50 MM Kg -
MS - SQ BAR - 65X65 MM Kg -

MS - UNP 50X39X5X7 Kg -
MS - UNP 65X42X5.5X7.5 Kg -
MS - UNP 75X40X5X7 Kg -
MS - UNP 80X45X6X8 Kg -
MS - UNP 100X50X5X7.5 Kg -
MS - UNP 120X55X7X9 Kg -
MS - UNP 125X65X6X8 Kg -
MS - UNP 140X60X7X10 Kg -
MS - UNP 150X75X6.5X10 Kg -
MS - UNP 160X65X7.5X10.5 Kg -
MS - UNP 180X70X8X11 Kg -

6(253) Satuan Material


515379445.xls

NO MATERIAL SPESIFIKASI SATUAN HARGA

MS - UNP 180X75X7X10.5 Kg -
MS - UNP 200X75X8.5X11.5 Kg -
MS - UNP 200X80X7.5X11 Kg -
MS - UNP 220X80X9X12.5 Kg -
MS - UNP 240X85X9.5X13 Kg -
MS - UNP 250X90X9X13 Kg -
MS - UNP 260X90X10X14 Kg -
MS - UNP 280X95X10X15 Kg -
MS - UNP 300X90X9X13 Kg -
MS - UNP 300X100X10X16 Kg -
MS - UNP 320X100X14X17.5 Kg -
MS - UNP 400X110X14X18 Kg -

MS - WF 100X100X6X8 Kg -
MS - WF 100X50X5X7 Kg -
MS - WF 125X125X6.5X9 Kg -
MS - WF 125X60X6X8 Kg -
MS - WF 148X100X6X9 Kg -
MS - WF 150X150X7X10 Kg -
MS - WF 150X75X5X7 Kg -
MS - WF 175X90X5X8 Kg -
MS - WF 198X99X4.5X7 Kg -
MS - WF 200X100X5.5X8 Kg -
MS - WF 200X200X8X12 Kg -
MS - WF 248X124X5X8 Kg -
MS - WF 250X125X6X9 Kg -
MS - WF 250X250X9X14 Kg -
MS - WF 298X149X5.5X8 Kg -
MS - WF 300X150X6.5X9 Kg -
MS - WF 300X300X10X15 Kg -
MS - WF 346X174X6X9 Kg -
MS - WF 350X175X7X11 Kg -
MS - WF 350X350X12X19 Kg -
MS - WF 396X199X7X11 Kg -
MS - WF 400X200X8X13 Kg -
MS - WF 400X400X13X21 Kg -
MS - WF 446X199X8X12 Kg -
MS - WF 450X200X9X14 Kg -
MS - WF 500X200X10X16 Kg -
MS - WF 600X200X11X17 Kg -
MS - WF 700X300X13X24 Kg -
MS - WF 800X300X14X26 Kg -

RAIL 9 KG/M Kg -
RAIL 12 KG/M Kg -
RAIL 15 KG/M Kg -

Besi Beton Polos Ø 6 mm Kg -


Besi Beton Polos Ø 8 mm Kg -
Besi Beton Polos Ø 10 mm Kg -
Besi Beton Polos Ø 12 mm Kg -
Besi Beton Polos Ø 13 mm Kg -
Besi Beton Polos Ø 16 mm Kg -

7(253) Satuan Material


515379445.xls

NO MATERIAL SPESIFIKASI SATUAN HARGA

Besi Beton Polos Ø 19 mm Kg -


Besi Beton Polos Ø 22 mm Kg -
Besi Beton Polos Ø 25 mm Kg -
Besi Beton Polos Ø 28 mm Kg -
Besi Beton Polos Ø 32 mm Kg -
Besi Beton Polos Ø 36 mm Kg -

Besi Beton Deform D 8 mm Kg -


Besi Beton Deform D 10 mm Kg -
Besi Beton Deform D 12 mm Kg -
Besi Beton Deform D 13 mm Kg -
Besi Beton Deform D 16 mm Kg -
Besi Beton Deform D 19 mm Kg -
Besi Beton Deform D 22 mm Kg -
Besi Beton Deform D 25 mm Kg -
Besi Beton Deform D 29 mm Kg -
Besi Beton Deform D 32 mm Kg -
Besi Beton Deform D 36 mm Kg -

Wiremesh M 4 M²
Wiremesh M 5 M²
Wiremesh M 6 M² -
Wiremesh M 7 M²
Wiremesh M 8 M²
Wiremesh M 9 M²
Wiremesh M 10 M²
Wiremesh M 12 M²

Pipa Hitam STK 41 - Ø 2-1/2" - 2.8 mm Kg -


Pipa Hitam STK 41 - Ø 2-1/2" - 3.2 mm Kg -
Pipa Hitam STK 41 - Ø 3" - 3.2 mm Kg -
Pipa Hitam STK 41 - Ø 4" - 3.5 mm Kg -
Pipa Hitam STK 41 - Ø 4" - 4.5 mm Kg -
Pipa Hitam STK 41 - Ø 5" - 4.5 mm Kg -
Pipa Hitam STK 41 - Ø 5" - 6 mm Kg -
Pipa Hitam STK 41 - Ø 6" - 4.5 mm Kg -
Pipa Hitam STK 41 - Ø 6" - 5 mm Kg -
Pipa Hitam STK 41 - Ø 6" - 6 mm Kg -
Pipa Hitam STK 41 - Ø 7" - 5.3 mm Kg -
Pipa Hitam STK 41 - Ø 8" - 5.8 mm Kg -
Pipa Hitam STK 41 - Ø 8" - 8.2 mm Kg -
Pipa Hitam STK 41 - Ø 10" - 6.6 mm Kg -
Pipa Hitam STK 41 - Ø 12" - 6.9 mm Kg -
Pipa Hitam STK 41 - Ø 14" - 7.9 mm Kg -

Pipa Galvanized - Ø 1-1/4" Kg -


Pipa Hitam Medium - Ø 1/2" Kg -
Pipa Hitam Medium - Ø 3/4" Kg -
Pipa Hitam Medium - Ø 1" Kg -
Pipa Hitam Medium - Ø 1-1/4" Kg -
Pipa Hitam Medium - Ø 1-1/2" Kg -
Pipa Hitam Medium - Ø 2" Kg -
Pipa Hitam Medium - Ø 2-1/2" Kg -

8(253) Satuan Material


515379445.xls

NO MATERIAL SPESIFIKASI SATUAN HARGA

Pipa Hitam Medium - Ø 3" Kg -


Pipa Hitam Medium - Ø 4" Kg -
Pipa Hitam Medium - Ø 5" Kg -
Pipa Hitam Medium - Ø 6" Kg -

Angkur - Ø 3/4" - L.200 MM Bh


Angkur - Ø 5/8" - L.400 MM Bh
Angkur - Ø 1" - L.400 MM Bh
Angkur - Ø 10 - L.60 MM Bh
Angkur - Ø 10 - L.200 MM Bh
Angkur - Ø 12 - L.120 MM Bh
Angkur - Ø 12 - L.200 MM Bh
Angkur - Ø 12 - L.250 MM Bh
Angkur - Ø 12 - L.300 MM Bh
Angkur - Ø 13 - L.300 MM Bh
Angkur - Ø 16 - L.180 MM Bh
Angkur - Ø 16 - L.200 MM Bh
Angkur - Ø 16 - L.300 MM Bh
Angkur - Ø 16 - L.350 MM Bh
Angkur - Ø 16 - L.400 MM Bh
Angkur - Ø 16 - L.500 MM Bh
Angkur - Ø 19 - L.200 MM Bh
Angkur - Ø 19 - L.300 MM Bh
Angkur - Ø 19 - L.400 MM Bh
Angkur - Ø 19 - L.500 MM Bh
Angkur - Ø 19 - L.600 MM Bh
Angkur - Ø 20 - L.200 MM Bh
Angkur - Ø 20 - L.300 MM Bh
Angkur - Ø 22 - L.300 MM Bh
Angkur - Ø 22 - L.400 MM Bh
Angkur - Ø 22 - L.500 MM Bh
Angkur - Ø 22 - L.600 MM Bh
Angkur - Ø 25 - L.300 MM Bh
Angkur - Ø 25 - L.350 MM Bh
Angkur - Ø 25 - L.400 MM Bh
Angkur - Ø 25 - L.500 MM Bh
Angkur - Ø 25 - L.600 MM Bh
Angkur - Ø 25 - L.800 MM Bh
Angkur - Ø 30 - L.400 MM Bh
Angkur - Ø 30 - L.450 MM Bh
Angkur - Ø 30 - L.800 MM Bh
Angkur - Ø 32 - L.1150 MM Bh
Angkur - Ø 38 - L.2000 MM Bh

BOLT & NUT HTB A325 - Ø 1/2" X 1-1/4" Bh


BOLT & NUT HTB A325 - Ø 1/2" X 1" Bh
BOLT & NUT HTB A325 - Ø 1/2" X 1-1/2" Bh
BOLT & NUT HTB A325 - Ø 1/2" X 1-3/4" Bh
BOLT & NUT HTB A325 - Ø 1/2" X 2" Bh
BOLT & NUT HTB A325 - Ø 1/2" X 2-1/4" Bh
BOLT & NUT HTB A325 - Ø 1/2" X 2-1/2" Bh
BOLT & NUT HTB A325 - Ø 1/2" X 2-3/4" Bh
BOLT & NUT HTB A325 - Ø 1/2" X 3" Bh

9(253) Satuan Material


515379445.xls

NO MATERIAL SPESIFIKASI SATUAN HARGA

BOLT & NUT HTB A325 - Ø 1/2" X 3-1/2" Bh


BOLT & NUT HTB A325 - Ø 1/2" X 4" Bh
BOLT & NUT HTB A325 - Ø 1/2" X 4-1/2" Bh
BOLT & NUT HTB A325 - Ø 1/2" X 5" Bh
BOLT & NUT HTB A325 - Ø 1/2" X 5-1/2" Bh
BOLT & NUT HTB A325 - Ø 1/2" X 6" Bh
BOLT & NUT HTB A325 - Ø 5/8" X 1-1/2" Bh
BOLT & NUT HTB A325 - Ø 5/8" X 1-3/4" Bh
BOLT & NUT HTB A325 - Ø 5/8" X 2" Bh
BOLT & NUT HTB A325 - Ø 5/8" X 2-1/4" Bh
BOLT & NUT HTB A325 - Ø 5/8" X 2-1/2" Bh
BOLT & NUT HTB A325 - Ø 5/8" X 2-3/4" Bh
BOLT & NUT HTB A325 - Ø 5/8" X 3" Bh
BOLT & NUT HTB A325 - Ø 5/8" X 3-1/2" Bh
BOLT & NUT HTB A325 - Ø 5/8" X 4" Bh
BOLT & NUT HTB A325 - Ø 5/8" X 4-1/2" Bh
BOLT & NUT HTB A325 - Ø 5/8" X 5" Bh
BOLT & NUT HTB A325 - Ø 5/8" X 5-1/2" Bh
BOLT & NUT HTB A325 - Ø 5/8" X 6" Bh
BOLT & NUT HTB A325 - Ø 3/4" X 1-1/2" Bh
BOLT & NUT HTB A325 - Ø 3/4" X 1-3/4" Bh
BOLT & NUT HTB A325 - Ø 3/4" X 2" Bh
BOLT & NUT HTB A325 - Ø 3/4" X 2-1/4" Bh
BOLT & NUT HTB A325 - Ø 3/4" X 2-1/2" Bh
BOLT & NUT HTB A325 - Ø 3/4" X 2-3/4" Bh
BOLT & NUT HTB A325 - Ø 3/4" X 3" Bh
BOLT & NUT HTB A325 - Ø 3/4" X 3-1/4" Bh
BOLT & NUT HTB A325 - Ø 3/4" X 3-1/2" Bh
BOLT & NUT HTB A325 - Ø 3/4" X 4" Bh
BOLT & NUT HTB A325 - Ø 3/4" X 4-1/2" Bh
BOLT & NUT HTB A325 - Ø 3/4" X 5" Bh
BOLT & NUT HTB A325 - Ø 3/4" X 5-1/2" Bh
BOLT & NUT HTB A325 - Ø 3/4" X 6" Bh
BOLT & NUT HTB A325 - Ø 7/8" X 1-1/2" Bh
BOLT & NUT HTB A325 - Ø 7/8" X 1-3/4" Bh
BOLT & NUT HTB A325 - Ø 7/8" X 2" Bh
BOLT & NUT HTB A325 - Ø 7/8" X 2-1/4" Bh
BOLT & NUT HTB A325 - Ø 7/8" X 2-1/2" Bh
BOLT & NUT HTB A325 - Ø 7/8" X 2-3/4" Bh
BOLT & NUT HTB A325 - Ø 7/8" X 3" Bh
BOLT & NUT HTB A325 - Ø 7/8" X 3-1/4" Bh
BOLT & NUT HTB A325 - Ø 7/8" X 3-1/2" Bh
BOLT & NUT HTB A325 - Ø 7/8" X 3-3/4" Bh
BOLT & NUT HTB A325 - Ø 7/8" X 4" Bh
BOLT & NUT HTB A325 - Ø 7/8" X 4-1/2" Bh
BOLT & NUT HTB A325 - Ø 7/8" X 5" Bh
BOLT & NUT HTB A325 - Ø 7/8" X 5-1/2" Bh
BOLT & NUT HTB A325 - Ø 7/8" X 6" Bh
BOLT & NUT HTB A325 - Ø 1" X 1-1/2" Bh
BOLT & NUT HTB A325 - Ø 1" X 1-3/4" Bh
BOLT & NUT HTB A325 - Ø 1" X 2" Bh
BOLT & NUT HTB A325 - Ø 1" X 2-1/4" Bh
BOLT & NUT HTB A325 - Ø 1" X 2-1/2" Bh

10(253) Satuan Material


515379445.xls

NO MATERIAL SPESIFIKASI SATUAN HARGA

BOLT & NUT HTB A325 - Ø 1" X 2-3/4" Bh


BOLT & NUT HTB A325 - Ø 1" X 3" Bh
BOLT & NUT HTB A325 - Ø 1" X 3-1/2" Bh
BOLT & NUT HTB A325 - Ø 1" X 4" Bh
BOLT & NUT HTB A325 - Ø 1" X 4-1/2" Bh
BOLT & NUT HTB A325 - Ø 1" X 5" Bh
BOLT & NUT HTB A325 - Ø 1" X 5-1/2" Bh
BOLT & NUT HTB A325 - Ø 1" X 6" Bh
BOLT & NUT HTB A325 - Ø 1-1/4" X 1-1/2" Bh
BOLT & NUT HTB A325 - Ø 1-1/4" X 1-3/4" Bh
BOLT & NUT HTB A325 - Ø 1-1/4" X 2" Bh
BOLT & NUT HTB A325 - Ø 1-1/4" X 2-1/4" Bh
BOLT & NUT HTB A325 - Ø 1-1/4" X 2-1/2" Bh
BOLT & NUT HTB A325 - Ø 1-1/4" X 2-3/4" Bh
BOLT & NUT HTB A325 - Ø 1-1/4" X 3" Bh
BOLT & NUT HTB A325 - Ø 1-1/4" X 3-1/2" Bh
BOLT & NUT HTB A325 - Ø 1-1/4" X 4" Bh
BOLT & NUT HTB A325 - Ø 1-1/4" X 4-1/2" Bh
BOLT & NUT HTB A325 - Ø 1-1/4" X 5" Bh
BOLT & NUT HTB A325 - Ø 1-1/4" X 5-1/2" Bh
BOLT & NUT HTB A325 - Ø 1-1/4" X 6" Bh
BOLT & NUT HTB A325 - Ø 1-1/2" X 1-1/2" Bh
BOLT & NUT HTB A325 - Ø 1-1/2" X 1-3/4" Bh
BOLT & NUT HTB A325 - Ø 1-1/2" X 2" Bh
BOLT & NUT HTB A325 - Ø 1-1/2" X 2-1/4" Bh
BOLT & NUT HTB A325 - Ø 1-1/2" X 2-1/2" Bh
BOLT & NUT HTB A325 - Ø 1-1/2" X 2-3/4" Bh
BOLT & NUT HTB A325 - Ø 1-1/2" X 3" Bh
BOLT & NUT HTB A325 - Ø 1-1/2" X 3-1/2" Bh
BOLT & NUT HTB A325 - Ø 1-1/2" X 4" Bh
BOLT & NUT HTB A325 - Ø 1-1/2" X 4-1/2" Bh
BOLT & NUT HTB A325 - Ø 1-1/2" X 5" Bh
BOLT & NUT HTB A325 - Ø 1-1/2" X 5-1/2" Bh
BOLT & NUT HTB A325 - Ø 1-1/2" X 6" Bh

BOLT & NUT M 6 X 12 Bh


BOLT & NUT M 6 X 16 Bh
BOLT & NUT M 6 X 20 Bh
BOLT & NUT M 6 X 25 Bh
BOLT & NUT M 6 X 30 Bh
BOLT & NUT M 6 X 35 Bh
BOLT & NUT M 6 X 40 Bh
BOLT & NUT M 6 X 45 Bh
BOLT & NUT M 6 X 50 Bh
BOLT & NUT M 6 X 55 Bh
BOLT & NUT M 6 X 60 Bh
BOLT & NUT M 6 X 70 Bh
BOLT & NUT M 8 X 16 Bh
BOLT & NUT M 8 X 20 Bh
BOLT & NUT M 8 X 25 Bh
BOLT & NUT M 8 X 30 Bh
BOLT & NUT M 8 X 35 Bh
BOLT & NUT M 8 X 40 Bh

11(253) Satuan Material


515379445.xls

NO MATERIAL SPESIFIKASI SATUAN HARGA

BOLT & NUT M 8 X 45 Bh


BOLT & NUT M 8 X 50 Bh
BOLT & NUT M 8 X 55 Bh
BOLT & NUT M 8 X 60 Bh
BOLT & NUT M 8 X 70 Bh
BOLT & NUT M 8 X 75 Bh
BOLT & NUT M 8 X 80 Bh
BOLT & NUT M 8 X 90 Bh
BOLT & NUT M 8 X 100 Bh
BOLT & NUT M 8 X 110 Bh
BOLT & NUT M 8 X 130 Bh
BOLT & NUT M 10 X 16 Bh
BOLT & NUT M 10 X 20 Bh
BOLT & NUT M 10 X 25 Bh
BOLT & NUT M 10 X 30 Bh
BOLT & NUT M 10 X 35 Bh
BOLT & NUT M 10 X 40 Bh
BOLT & NUT M 10 X 45 Bh
BOLT & NUT M 10 X 50 Bh
BOLT & NUT M 10 X 55 Bh
BOLT & NUT M 10 X 60 Bh
BOLT & NUT M 10 X 65 Bh
BOLT & NUT M 10 X 70 Bh
BOLT & NUT M 10 X 75 Bh
BOLT & NUT M 10 X 80 Bh
BOLT & NUT M 10 X 90 Bh
BOLT & NUT M 10 X 100 Bh
BOLT & NUT M 10 X 110 Bh
BOLT & NUT M 10 X 120 Bh
BOLT & NUT M 10 X 130 Bh
BOLT & NUT M 10 X 140 Bh
BOLT & NUT M 10 X 150 Bh
BOLT & NUT M 12 X 20 Bh
BOLT & NUT M 12 X 25 Bh
BOLT & NUT M 12 X 30 Bh
BOLT & NUT M 12 X 35 Bh
BOLT & NUT M 12 X 40 Bh
BOLT & NUT M 12 X 45 Bh
BOLT & NUT M 12 X 50 Bh
BOLT & NUT M 12 X 55 Bh
BOLT & NUT M 12 X 60 Bh
BOLT & NUT M 12 X 65 Bh
BOLT & NUT M 12 X 70 Bh
BOLT & NUT M 12 X 75 Bh
BOLT & NUT M 12 X 80 Bh
BOLT & NUT M 12 X 90 Bh
BOLT & NUT M 12 X 100 Bh
BOLT & NUT M 12 X 110 Bh
BOLT & NUT M 12 X 120 Bh
BOLT & NUT M 12 X 130 Bh
BOLT & NUT M 12 X 140 Bh
BOLT & NUT M 12 X 150 Bh
BOLT & NUT M 14 X 30 Bh

12(253) Satuan Material


515379445.xls

NO MATERIAL SPESIFIKASI SATUAN HARGA

BOLT & NUT M 14 X 35 Bh


BOLT & NUT M 14 X 40 Bh
BOLT & NUT M 14 X 45 Bh
BOLT & NUT M 14 X 50 Bh
BOLT & NUT M 14 X 55 Bh
BOLT & NUT M 14 X 60 Bh
BOLT & NUT M 14 X 70 Bh
BOLT & NUT M 14 X 75 Bh
BOLT & NUT M 14 X 80 Bh
BOLT & NUT M 14 X 90 Bh
BOLT & NUT M 14 X 100 Bh
BOLT & NUT M 14 X 110 Bh
BOLT & NUT M 14 X 120 Bh
BOLT & NUT M 14 X 130 Bh
BOLT & NUT M 14 X 140 Bh
BOLT & NUT M 14 X 150 Bh
BOLT & NUT M 16 X 30 Bh
BOLT & NUT M 16 X 35 Bh
BOLT & NUT M 16 X 40 Bh
BOLT & NUT M 16 X 45 Bh
BOLT & NUT M 16 X 50 Bh
BOLT & NUT M 16 X 55 Bh
BOLT & NUT M 16 X 60 Bh
BOLT & NUT M 16 X 65 Bh
BOLT & NUT M 16 X 70 Bh
BOLT & NUT M 16 X 75 Bh
BOLT & NUT M 16 X 80 Bh
BOLT & NUT M 16 X 90 Bh
BOLT & NUT M 16 X 100 Bh
BOLT & NUT M 16 X 110 Bh
BOLT & NUT M 16 X 120 Bh
BOLT & NUT M 16 X 130 Bh
BOLT & NUT M 16 X 140 Bh
BOLT & NUT M 16 X 150 Bh
BOLT & NUT M 18 X 40 Bh
BOLT & NUT M 18 X 45 Bh
BOLT & NUT M 18 X 50 Bh
BOLT & NUT M 18 X 55 Bh
BOLT & NUT M 18 X 60 Bh
BOLT & NUT M 18 X 65 Bh
BOLT & NUT M 18 X 70 Bh
BOLT & NUT M 18 X 75 Bh
BOLT & NUT M 18 X 80 Bh
BOLT & NUT M 18 X 90 Bh
BOLT & NUT M 18 X 100 Bh
BOLT & NUT M 18 X 110 Bh
BOLT & NUT M 18 X 120 Bh
BOLT & NUT M 18 X 130 Bh
BOLT & NUT M 18 X 140 Bh
BOLT & NUT M 18 X 150 Bh
BOLT & NUT M 20 X 40 Bh
BOLT & NUT M 20 X 45 Bh
BOLT & NUT M 20 X 50 Bh

13(253) Satuan Material


515379445.xls

NO MATERIAL SPESIFIKASI SATUAN HARGA

BOLT & NUT M 20 X 55 Bh


BOLT & NUT M 20 X 60 Bh
BOLT & NUT M 20 X 65 Bh
BOLT & NUT M 20 X 70 Bh
BOLT & NUT M 20 X 75 Bh
BOLT & NUT M 20 X 80 Bh
BOLT & NUT M 20 X 90 Bh
BOLT & NUT M 20 X 100 Bh
BOLT & NUT M 20 X 110 Bh
BOLT & NUT M 20 X 120 Bh
BOLT & NUT M 20 X 130 Bh
BOLT & NUT M 20 X 140 Bh
BOLT & NUT M 20 X 150 Bh
BOLT & NUT M 22 X 40 Bh
BOLT & NUT M 22 X 50 Bh
BOLT & NUT M 22 X 55 Bh
BOLT & NUT M 22 X 60 Bh
BOLT & NUT M 22 X 65 Bh
BOLT & NUT M 22 X 70 Bh
BOLT & NUT M 22 X 75 Bh
BOLT & NUT M 22 X 80 Bh
BOLT & NUT M 22 X 90 Bh
BOLT & NUT M 22 X 100 Bh
BOLT & NUT M 22 X 110 Bh
BOLT & NUT M 22 X 120 Bh
BOLT & NUT M 22 X 130 Bh
BOLT & NUT M 22 X 140 Bh
BOLT & NUT M 22 X 150 Bh
BOLT & NUT M 24 X 50 Bh
BOLT & NUT M 24 X 55 Bh
BOLT & NUT M 24 X 60 Bh
BOLT & NUT M 24 X 65 Bh
BOLT & NUT M 24 X 70 Bh
BOLT & NUT M 24 X 75 Bh
BOLT & NUT M 24 X 80 Bh
BOLT & NUT M 24 X 90 Bh
BOLT & NUT M 24 X 100 Bh
BOLT & NUT M 24 X 110 Bh
BOLT & NUT M 24 X 120 Bh
BOLT & NUT M 24 X 130 Bh
BOLT & NUT M 24 X 140 Bh
BOLT & NUT M 24 X 150 Bh
BOLT & NUT M 32 X 70 Bh
BOLT & NUT M 32 X 75 Bh
BOLT & NUT M 32 X 80 Bh
BOLT & NUT M 32 X 90 Bh
BOLT & NUT M 32 X 100 Bh
BOLT & NUT M 32 X 110 Bh
BOLT & NUT M 32 X 120 Bh
BOLT & NUT M 32 X 130 Bh
BOLT & NUT M 32 X 140 Bh
BOLT & NUT M 32 X 150 Bh

14(253) Satuan Material


515379445.xls

NO MATERIAL SPESIFIKASI SATUAN HARGA

Nut M 12 Bh

Turn Buckle 5/8" Bh


Turn Buckle 3/4" Bh
Turn Buckle 1" Bh

Profil Aluminium Kusen M'


Profil Aluminium Daun Pintu M'
Profil Aluminium Daun Jendela M'
Lembaran Aluminium M²

Mini Pile 200x200 mm M'


Spun Pile Ø 500 mm M'

Kawat Duri/Barbed Wire M'


Kawat Harmonika 5 x 5 cm Galvanized 3 mm M² -
Galvanized Welded Mesh 4"x4" M²

Gypsum c/w rangka M²

Humus M²
Rumput Manila M²

Ijuk kg

Pasang Lemari Meja & Dinding Dapur (Kantor PKS) set


Pasang Lemari Meja Laboratorium Dingin (Kantor PKS) set
Pasang Lemari Meja Laboratorium Panas (Kantor PKS) set
Pasang Lemari Meja Ruang Sampel (Kantor PKS) set
Lemari Meja Laboratorium Panas (Kantor PKS) set
Lemari Meja Ruang Sampel (Kantor PKS) set

15(253) Satuan Material


515379445.xls

0 12 -
0 25
0 17
0 167
0 105
0 50
0 34
0 100
0 72
0 34
0 105
0 63
0 38
0 34
0 28
0 32
0 25

16(253) Satuan Material


515379445.xls

HARGA SATUAN UPAH UNTUK PEKERJAAN CIVIL

NO JENIS PEKERJAAN SATUAN HARGA 2018

Pasang Bowplank M' 7,049.46


Galian Tanah M³ 42,299.66
Urugan Tanah & Pemadatan M³ 14,100.37
Buang Tanah Sisa M³ 11,348.83
Pasang Bekisting Menerus M² 25,447.75
Pasang Bekisting Setempat M² 25,448.21
Pasang Bekisting Balok & Kolom M² 28,199.37
Pasang Bekisting Lantai M² 25,448.21
Pasang Bekisting Dinding M² 25,448.21
Pasang Stek Pondasi Menerus Kg 3,095.05
Pembesian Besi Beton Polos Kg 2,923.11
Pembesian Besi Beton Deform Kg 2,923.11
Pembesian Wiremesh M² 3,610.89
Pengecoran Beton 1:3:5 M³ 210,979.42
Pengecoran Beton 1:2:3 M³ 210,979.42
Pengecoran Beton K175 M³ 210,979.42
Pengecoran Beton K225 M³ 210,979.42
Pengecoran Lantai Kerja M² 14,443.58
Grouting M³ 210,979.42
Urug Pasir M³ 19,430.05
Urug Sirtu M³ 19,430.05
Pasang Batu Kali M³ 137,557.89
Pasang Keramik Lantai 40 x 40 cm M² 32,326.11
Pasang Keramik Lantai 33 x 33 cm M² 32,326.11
Pasang Keramik Lantai 30 x 30 cm M² 32,326.11
Pasang Keramik Lantai 20 x 20 cm M² 32,326.11
Pasang Keramik Dinding 20 x 40 cm M² 40,407.63
Pasang Keramik Dinding 10 x 20 cm M² 40,407.63
Pasang Keramik Dinding 20 x 20 cm M² 40,407.63
Pasang Keramik Meja 10 x 20 cm M² 40,407.63
Pasang List Keramik 10 x 20 cm M' 10,101.91
Pasang Plint Keramik 10 x 40 cm M' 8,081.53
Pasang Bata M² 29,059.11
Pasang Rooster M² 21,836.63
Acian M² 8,735.10
Acian Trowel M² 12,375.00
Plester 1:4 + Aci M² 21,836.63
Plester 1:2 + Aci M² 21,836.63
Skonengan M' 13,750.00
Tali Air M' 18,568.00
Perkayuan Kap M³ 1,359,760.25
Pasang Lisplank M' 16,335.00
Pasang Penutup Atap Spandek M² 15,125.00
Pasang Clading Trimdek M² 15,730.00
Pasang Dinding Wiremesh M² 15,730.00
Pasang Rabung Spandek M' 12,100.00
Pasang Penutup Atap Multi Roof M² 15,125.00
Pasang Rabung Multi Roof M' 12,100.00
Pasang Nok Samping Multi Roof M' 12,100.00
Pasang Rangka Atap Multi Truss M² 87,725.00
Pasang Flashing M' 12,100.00
Pasang Corner Flashing M' 12,100.00
Pasang Flashing Talang M' 12,100.00
Pasang Plafond M² 30,250.00
Pasang Skirting Plafond M' 9,801.00
Pasang List Plafond M' 8,081.83

17(253) Satuan Upah


515379445.xls

NO JENIS PEKERJAAN SATUAN HARGA 2018


Pengecatan Dinding M² 12,035.63
Pengecatan Plafond M² 12,035.63
Pengecatan Kusen M² 16,163.66
Pengecatan Pintu & Jendela M² 14,443.04
Pengecatan Listplank M' 8,081.83
Coalter Kuda-Kuda M² 6,534.00
Pengecatan Baja Kg 473.35
Pembersihan M² 6,534.00
Pasang Pipa PVC M' 24,072.71
Pasang Urinoir Bh 283,713.54
Pasang Closet Duduk Bh 283,713.54
Pasang Closet Jongkok Bh 141,856.04
Pasang Keran Air Bh 8,081.83
Pasang Floor Drain Bh 8,081.83
Pasang Wastafel Bh 141,856.04
Pasang Cermin Bh 24,072.71
Pasang Tempat Sabun Bh 32,325.88
Pasang Kitchen Zinch Bh 141,856.04
Instalasi Titik Lampu Bh 48,489.54
Pasang Saklar Bh 8,081.83
Pasang Stop Kontak Bh 8,081.83
Pasang Stop Kontak AC Bh 8,081.83
Pasang Lampu Bh 24,072.71
Fabrikasi Kusen Kayu M' 27,511.04
Fabrikasi Daun Pintu Panel M² 213,400.00
Fabrikasi Daun Jendela M² 213,400.00
Fabrikasi Daun Pintu Triplek M² 170,720.00
Pasang Kusen M² 20,977.04
Pasang Pintu Bh 88,553.12
Pasang Jendela Bh 40,407.71
Pasang Kunci Tanam Bh 24,072.64
Pasang Kunci Pintu Toilet Bh 24,098.84
Pasang Handle Pintu Kupu-kupu Bh 24,098.84
Pasang Engsel Bh 8,081.83
Pasang Grendel Bh 8,081.83
Pasang Pegangan Jendela Bh 8,081.83
Pasang Hak Angin Bh 8,081.83
Pasang Engsel Pintu Ø 19 Bh 16,163.66
Pasang Grendel Tanam Ø 16 mm Bh 24,072.71
Pasang Roller Pintu Ø 60 mm Bh 40,407.71
Pasang Roda Pintu Bh 56,398.58
Pasang Gantungan Pintu Bh 56,398.58
Pasang Kaca M² 13,756.25
Pengaspalan M³ 945,710.83
Pasang Angkur Bh 13,756.25
Fabrikasi / Ereksi Pelat Baja Kg 3,701.50
Fabrikasi / Ereksi Profil Baja WF Kg 3,701.50
Fabrikasi / Ereksi Profil Baja UNP Kg 3,701.50
Fabrikasi / Ereksi Profil Baja CNP Kg 3,701.50
Fabrikasi / Ereksi Profil Baja L Kg 3,701.50
Fabrikasi / Ereksi Profil Baja Square Bar Kg 3,701.50
Fabrikasi / Ereksi Pipa Hitam Medium Kg 3,701.50
Fabrikasi / Ereksi Pipa Hitam STK 41 Kg 3,701.50
Fabrikasi / Ereksi RAIL Kg 27,425.38
Pasang Baut HTB Bh 500.00
Pasang Baut Hitam Bh 500.00
Pasang Turn Buckle Bh 16,163.66
Pekerjaan Perkayuan M³ 1,361,823.54
Pemancangan Mini Pile 200x200 mm M'/<300 titik 36,000.00
Pemancangan Mini Pile 200x200 mm M'/>300 titik 30,600.00
Potong Pancang Mini Pile 200x200 mm < 300 Titik 30,000.00
Potong Pancang Mini Pile 200x200 mm > 300 Titik 25,500.00

18(253) Satuan Upah


515379445.xls

NO JENIS PEKERJAAN SATUAN HARGA 2018


Pemancangan Tiang Kayu Ø 150 - 4 m M'/<1000 titik 16,675.00
Pemancangan Tiang Kayu Ø 150 - 4 m M'/>1000 titik 14,173.75
Pasang Pilar Unit 1,210,000.00
Membuat Dudukan Tandon Unit 1,210,000.00
Pasang Kawat Duri M 1,891.96
Pasang Kawat Harmonika M² 6,619.67
Pasang Galvanized Welded Mesh M² 18,913.75
Pasang Bata Press 1/2 Bata M² 29,059.11
Pasang Bata Press 1-1/2 Bata M² 58,117.75

19(253) Satuan Upah


515379445.xls

HARGA SATUAN PEKERJAAN CIVIL

BAHAN UPAH
NO. JENIS PEKERJAAN SATUAN VOLUME
SATUAN TOTAL SATUAN TOTAL

PEKERJAAN TANAH DAN PONDASI

Bowplank m' 1.00 - 7,049.46


Bahan Kayu Papan 2/20 - 4 m Btg 0.26 - - - -
Kayu Balok 4/6 - 4 m Btg 0.25 - - - -
Paku 2,5" Kg 0.01 - - -
Benang Nylon Rol 0.02 - - -
Upah Pasang Bowplank m' 1.00 - - 7,049.46 7,049.46

Galian Tanah m3 1.00 - 42,299.66


Upah Galian Tanah 1.00 - - 42,299.66 42,299.66

Urugan Tanah & Pemadatan m3 1.00 - 14,100.37


Upah Urugan Tanah & Pemadatan 1.00 - - 14,100.37 14,100.37

Buang Tanah Sisa m3 1.00 - 11,348.83


Upah Buang Tanah Sisa 1.00 - - 11,348.83 11,348.83

Urug Pasir M³ 1.00 - 19,430.05


Bahan Pasir Urug M³ 1.20 - - -
Upah Urug Pasir M³ 1.00 - - 19,430.05 19,430.05

Urug Sirtu M³ 1.00 - 19,430.05


Bahan Sirtu M³ 1.20 - - -
Upah Urug Sirtu M³ 1.00 - - 19,430.05 19,430.05

Pondasi Rollag Bata M' 1.00 - 8,717.73


Bahan Bata 5 x 10 x 20 cm Bh 19.00 - - -
Semen PC Type 1 @ 50 Kg Zak 0.08 - - -

20(253) Satuan Pekerjaan


515379445.xls

BAHAN UPAH
NO. JENIS PEKERJAAN SATUAN VOLUME
SATUAN TOTAL SATUAN TOTAL
Pasir Pasang M³ 0.02 - - -
Upah Pasang Bata M² 0.30 - - 29,059.11 8,717.73

Pasangan Batu Kali M³ 1.00 - 137,557.89


Bahan Batu Kali M³ 1.30 - - -
Semen PC Type 1 @ 50 Kg Zak 3.26 - - -
Pasir Pasang M³ 0.60 - - -
Upah Pasang Batu Kali M² 1.00 - - 137,557.89 137,557.89

PEKERJAAN TIANG PANCANG

Mini Pile 200x200 mm M' 1.00 - 36,000.00


Bahan Mini Pile 200x200 mm M' 1.00 - - -
Upah Pemancangan Mini Pile 200x200 mm M' 1.00 - - 36,000.00 36,000.00

Potong Pancang Mini Pile 200x200 mm Titik 1.00 - 30,000.00


Bahan Titik 1.00 - - - -
Upah Potong Pancang Mini Pile 200x200 mm Titik 1.00 - - 30,000.00 30,000.00

Spun Pile Ø 500 mm M' 1.00 - #N/A


Bahan Spun Pile Ø 500 mm M' 1.00 - - -
Upah Pemancangan Spun Pile Ø 500 mm M' 1.00 - - #N/A #N/A

Tiang Kayu Ø 150 - 4 m Titik 1.00 - 16,675.00


Bahan Tiang Kayu Ø 150 - 4 m m' 1.00 - - - -
Upah Pemancangan Tiang Kayu Ø 150 - 4 m m' 1.00 - - 16,675.00 16,675.00

PEKERJAAN KONSTRUKSI BETON

Kayu kelas I M³ 1.00 - 1,361,823.54


Bahan Kayu kelas I M³ 1.10 - - -
Upah Pekerjaan perkayuan M³ 1.00 - - 1,361,823.54 1,361,823.54

21(253) Satuan Pekerjaan


515379445.xls

BAHAN UPAH
NO. JENIS PEKERJAAN SATUAN VOLUME
SATUAN TOTAL SATUAN TOTAL

Kayu kelas II M³ 1.00 - 1,361,823.54


Bahan Kayu kelas II M³ 1.10 - - -
Upah Pekerjaan perkayuan M³ 1.00 - - 1,361,823.54 1,361,823.54

PEKERJAAN KONSTRUKSI BETON

Bekisting Menerus M² 1.00 - 25,447.75


Bahan Kayu Papan 2/20 - 4 m Btg 0.66 - - - -
Kayu Balok 4/6 - 4 m Btg 0.53 - - - -
Paku 2" Kg 0.15 - - -
Paku 4" Kg 0.25 - - -
Upah Pasang Bekisting Menerus M² 1.00 - - 25,447.75 25,447.75

Bekisting Setempat M² 1.00 - 25,448.21


Bahan Kayu Papan 2/20 - 4 m Btg 0.66 - - - -
Kayu Balok 4/6 - 4 m Btg 0.53 - - - -
Paku 2" Kg 0.10 - - -
Paku 4" Kg 0.20 - - -
Upah Pasang Bekisting Setempat M² 1.00 - - 25,448.21 25,448.21

Bekisting Balok & Kolom M² 1.00 - 28,199.37


Bahan Kayu Papan 2/20 - 4 m Btg 0.66 - - - -
Kayu Balok 4/6 - 4 m Btg 1.03 - - - -
Paku 2" Kg 0.15 - - -
Paku 4" Kg 0.25 - - -
Upah Pasang Bekisting Balok & Kolom M² 1.00 - - 28,199.37 28,199.37

Bekisting Lantai M² 1.00 - 25,448.21


Bahan Kayu Papan 2/20 - 4 m Btg 0.66 - - - -
Kayu Balok 4/6 - 4 m Btg 0.03 - - - -
Paku 2" Kg 0.02 - - -

22(253) Satuan Pekerjaan


515379445.xls

BAHAN UPAH
NO. JENIS PEKERJAAN SATUAN VOLUME
SATUAN TOTAL SATUAN TOTAL
Paku 4" Kg 0.05 - - -
Upah Pasang Bekisting Lantai M² 1.00 - - 25,448.21 25,448.21

Bekisting Dinding M² 1.00 - 25,448.21


Bahan Kayu Papan 2/20 - 4 m Btg 0.66 - - - -
Kayu Balok 4/6 - 4 m Btg 1.03 - - - -
Paku 2" Kg 0.15 - - -
Paku 4" Kg 0.25 - - -
Upah Pasang Bekisting Dinding M² 1.00 - - 25,448.21 25,448.21

Stek Pondasi Menerus Kg 1.00 - 3,095.05


Bahan Besi Beton Polos Ø 10 mm Kg 1.05 - - -
Upah Pasang Stek Pondasi Menerus Kg 1.00 - - 3,095.05 3,095.05

Stek Dinding Kg 1.00 - 3,095.05


Bahan Besi Beton Polos Ø 10 mm Kg 1.05 - - -
Upah Pasang Stek Pondasi Menerus Kg 1.00 - - 3,095.05 3,095.05

Besi Beton Polos Ø 6 mm Kg 1.00 - 2,923.11


Bahan Besi Beton Polos Ø 6 mm Kg 1.05 - - -
Kawat Beton/Bendrat Kg 0.02 - - -
Upah Pembesian Besi Beton Polos kg 1.00 - - 2,923.11 2,923.11

Besi Beton Polos Ø 8 mm Kg 1.00 - 2,923.11


Bahan Besi Beton Polos Ø 8 mm Kg 1.05 - - -
Kawat Beton/Bendrat Kg 0.02 - - -
Upah Pembesian Besi Beton Polos kg 1.00 - - 2,923.11 2,923.11

Besi Beton Polos Ø 10 mm Kg 1.00 - 2,923.11


Bahan Besi Beton Polos Ø 10 mm Kg 1.05 - - -
Kawat Beton/Bendrat Kg 0.02 - - -
Upah Pembesian Besi Beton Polos kg 1.00 - - 2,923.11 2,923.11

23(253) Satuan Pekerjaan


515379445.xls

BAHAN UPAH
NO. JENIS PEKERJAAN SATUAN VOLUME
SATUAN TOTAL SATUAN TOTAL
Besi Beton Polos Ø 12 mm Kg 1.00 - 2,923.11
Bahan Besi Beton Polos Ø 12 mm Kg 1.05 - - -
Kawat Beton/Bendrat Kg 0.02 - - -
Upah Pembesian Besi Beton Polos kg 1.00 - - 2,923.11 2,923.11

Besi Beton Polos Ø 13 mm Kg 1.00 - 2,923.11


Bahan Besi Beton Polos Ø 13 mm Kg 1.05 - - -
Kawat Beton/Bendrat Kg 0.02 - - -
Upah Pembesian Besi Beton Polos kg 1.00 - - 2,923.11 2,923.11

Besi Beton Polos Ø 16 mm Kg 1.00 - 2,923.11


Bahan Besi Beton Polos Ø 16 mm Kg 1.05 - - -
Kawat Beton/Bendrat Kg 0.02 - - -
Upah Pembesian Besi Beton Polos kg 1.00 - - 2,923.11 2,923.11

Besi Beton Polos Ø 19 mm Kg 1.00 - 2,923.11


Bahan Besi Beton Polos Ø 19 mm Kg 1.05 - - -
Kawat Beton/Bendrat Kg 0.02 - - -
Upah Pembesian Besi Beton Polos kg 1.00 - - 2,923.11 2,923.11

Besi Beton Polos Ø 22 mm Kg 1.00 - 2,923.11


Bahan Besi Beton Polos Ø 22 mm Kg 1.05 - - -
Kawat Beton/Bendrat Kg 0.02 - - -
Upah Pembesian Besi Beton Polos kg 1.00 - - 2,923.11 2,923.11

Besi Beton Polos Ø 25 mm Kg 1.00 - 2,923.11


Bahan Besi Beton Polos Ø 25 mm Kg 1.05 - - -
Kawat Beton/Bendrat Kg 0.02 - - -
Upah Pembesian Besi Beton Polos kg 1.00 - - 2,923.11 2,923.11

Besi Beton Polos Ø 28 mm Kg 1.00 - 2,923.11


Bahan Besi Beton Polos Ø 28 mm Kg 1.05 - - -
Kawat Beton/Bendrat Kg 0.02 - - -

24(253) Satuan Pekerjaan


515379445.xls

BAHAN UPAH
NO. JENIS PEKERJAAN SATUAN VOLUME
SATUAN TOTAL SATUAN TOTAL
Upah Pembesian Besi Beton Polos kg 1.00 - - 2,923.11 2,923.11

Besi Beton Polos Ø 32 mm Kg 1.00 - 2,923.11


Bahan Besi Beton Polos Ø 32 mm Kg 1.05 - - -
Kawat Beton/Bendrat Kg 0.02 - - -
Upah Pembesian Besi Beton Polos kg 1.00 - - 2,923.11 2,923.11

Besi Beton Polos Ø 36 mm Kg 1.00 - 2,923.11


Bahan Besi Beton Polos Ø 36 mm Kg 1.05 - - -
Kawat Beton/Bendrat Kg 0.02 - - -
Upah Pembesian Besi Beton Polos kg 1.00 - - 2,923.11 2,923.11

Besi Beton Deform D 13 mm Kg 1.00 - 2,923.11


Bahan Besi Beton Deform D 13 mm Kg 1.05 - - -
Kawat Beton/Bendrat Kg 0.02 - - -
Upah Pembesian Besi Beton Deform kg 1.00 - - 2,923.11 2,923.11

Besi Beton Deform D 16 mm Kg 1.00 - 2,923.11


Bahan Besi Beton Deform D 16 mm Kg 1.05 - - -
Kawat Beton/Bendrat Kg 0.02 - - -
Upah Pembesian Besi Beton Deform kg 1.00 - - 2,923.11 2,923.11

Besi Beton Deform D 19 mm Kg 1.00 - 2,923.11


Bahan Besi Beton Deform D 19 mm Kg 1.05 - - -
Kawat Beton/Bendrat Kg 0.02 - - -
Upah Pembesian Besi Beton Deform kg 1.00 - - 2,923.11 2,923.11

Besi Beton Deform D 22 mm Kg 1.00 - 2,923.11


Bahan Besi Beton Deform D 22 mm Kg 1.05 - - -
Kawat Beton/Bendrat Kg 0.02 - - -
Upah Pembesian Besi Beton Deform kg 1.00 - - 2,923.11 2,923.11

Besi Beton Deform D 25 mm Kg 1.00 - 2,923.11

25(253) Satuan Pekerjaan


515379445.xls

BAHAN UPAH
NO. JENIS PEKERJAAN SATUAN VOLUME
SATUAN TOTAL SATUAN TOTAL
Bahan Besi Beton Deform D 25 mm Kg 1.05 - - -
Kawat Beton/Bendrat Kg 0.02 - - -
Upah Pembesian Besi Beton Deform kg 1.00 - - 2,923.11 2,923.11

Besi Beton Deform D 29 mm Kg 1.00 - 2,923.11


Bahan Besi Beton Deform D 29 mm Kg 1.05 - - -
Kawat Beton/Bendrat Kg 0.02 - - -
Upah Pembesian Besi Beton Deform kg 1.00 - - 2,923.11 2,923.11

Besi Beton Deform D 32 mm Kg 1.00 - 2,923.11


Bahan Besi Beton Deform D 32 mm Kg 1.05 - - -
Kawat Beton/Bendrat Kg 0.02 - - -
Upah Pembesian Besi Beton Deform kg 1.00 - - 2,923.11 2,923.11

Besi Beton Deform D 36 mm Kg 1.00 - 2,923.11


Bahan Besi Beton Deform D 36 mm Kg 1.05 - - -
Kawat Beton/Bendrat Kg 0.02 - - -
Upah Pembesian Besi Beton Deform kg 1.00 - - 2,923.11 2,923.11

Wiremesh M 6 M² 1.00 - 3,610.89


Bahan Wiremesh M 6 M² 1.10 - - - -
Kawat Beton/Bendrat Kg 0.01 - - -
Upah Pembesian Wiremesh M² 1.00 - - 3,610.89 3,610.89

Beton 1:3:5 M³ 1.00 - 210,979.42


Bahan Semen PC Type 1 @ 50 Kg Zak 4.50 - - -
Pasir Beton/Cor M³ 0.63 - - -
Kerikil/koral M³ 0.90 - - -
Upah Pengecoran Beton 1:3:5 M² 1.00 - - 210,979.42 210,979.42

Beton 1:2:3 M³ 1.00 - 210,979.42


Bahan Semen PC Type 1 @ 50 Kg Zak 6.72 - - -
Pasir Beton/Cor M³ 0.56 - - -

26(253) Satuan Pekerjaan


515379445.xls

BAHAN UPAH
NO. JENIS PEKERJAAN SATUAN VOLUME
SATUAN TOTAL SATUAN TOTAL
Kerikil/koral M³ 0.80 - - -
Upah Pengecoran Beton 1:2:3 M² 1.00 - - 210,979.42 210,979.42

Beton K175 M³ 1.00 - 210,979.42


Bahan Semen PC Type 1 @ 50 Kg Zak 7.00 - - -
Pasir Beton/Cor M³ 0.60 - - -
Split M³ 0.80 - - -
Upah Pengecoran Beton K175 M² 1.00 - - 210,979.42 210,979.42

Beton K225 M³ 1.00 - 210,979.42


Bahan Semen PC Type 1 @ 50 Kg Zak 7.50 - - -
Pasir Beton/Cor M³ 0.50 - - -
Split M³ 0.80 - - -
Upah Pengecoran Beton K225 M² 1.00 - - 210,979.42 210,979.42

Beton K225 + ADDITIVE BetonTahan Asam M³ 1.00 - 210,979.42


Bahan Semen PC Type 1 @ 50 Kg Zak 8.00 - - -
Pasir Beton/Cor M³ 0.60 - - -
Split M³ 0.80 - - -
Sika - Sikafume Kg 20.00 - - -
Sika - Sikament LN Kg 4.00 - - -
Upah Pengecoran Beton K225 M² 1.00 - - 210,979.42 210,979.42

Lantai Kerja M² 1.00 - 14,443.58


Bahan Semen PC Type 1 @ 50 Kg Zak 0.22 - - -
Pasir Beton/Cor M³ 0.04 - - -
Kerikil/koral M³ 0.05 - - -
Upah Pengecoran Lantai Kerja M² 1.00 - - 14,443.58 14,443.58

Grouting M³ 1.00 - 210,979.42


Bahan Grouting M³ 1.08 - - -
Upah Grouting M³ 1.00 - - 210,979.42 210,979.42

27(253) Satuan Pekerjaan


515379445.xls

BAHAN UPAH
NO. JENIS PEKERJAAN SATUAN VOLUME
SATUAN TOTAL SATUAN TOTAL
Aspal M³ 1.00 - 945,710.83
Bahan Aspal Drum 0.65 - - -
Upah Pengaspalan M³ 1.00 - - 945,710.83 945,710.83

PEKERJAAN ANGKUR

Angkur - Ø 10 - L.60 MM Bh 1.00 - 13,756.25


Bahan Angkur - Ø 10 - L.60 MM Bh 1.00 - - -
Upah Pasang Angkur Bh 1.00 - - 13,756.25 13,756.25

Angkur - Ø 10 - L.200 MM Bh 1.00 - 13,756.25


Bahan Angkur - Ø 10 - L.200 MM Bh 1.00 - - -
Upah Pasang Angkur Bh 1.00 - - 13,756.25 13,756.25

Angkur - Ø 12 - L.120 MM Bh 1.00 - 13,756.25


Bahan Angkur - Ø 12 - L.120 MM Bh 1.00 - - -
Upah Pasang Angkur Bh 1.00 - - 13,756.25 13,756.25

Angkur - Ø 12 - L.200 MM Bh 1.00 - 13,756.25


Bahan Angkur - Ø 12 - L.200 MM Bh 1.00 - - -
Upah Pasang Angkur Bh 1.00 - - 13,756.25 13,756.25

Angkur - Ø 12 - L.250 MM Bh 1.00 - 13,756.25


Bahan Angkur - Ø 12 - L.250 MM Bh 1.00 - - -
Upah Pasang Angkur Bh 1.00 - - 13,756.25 13,756.25

Angkur - Ø 12 - L.300 MM Bh 1.00 - 13,756.25


Bahan Angkur - Ø 12 - L.300 MM Bh 1.00 - - -
Upah Pasang Angkur Bh 1.00 - - 13,756.25 13,756.25

Angkur - Ø 16 - L.180 MM Bh 1.00 - 13,756.25


Bahan Angkur - Ø 16 - L.180 MM Bh 1.00 - - -

28(253) Satuan Pekerjaan


515379445.xls

BAHAN UPAH
NO. JENIS PEKERJAAN SATUAN VOLUME
SATUAN TOTAL SATUAN TOTAL
Upah Pasang Angkur Bh 1.00 - - 13,756.25 13,756.25

Angkur - Ø 16 - L.200 MM Bh 1.00 - 13,756.25


Bahan Angkur - Ø 16 - L.200 MM Bh 1.00 - - -
Upah Pasang Angkur Bh 1.00 - - 13,756.25 13,756.25

Angkur - Ø 16 - L.250 MM Bh 1.00 - 13,756.25


Bahan Angkur - Ø 16 - L.200 MM Bh 1.00 - - -
Upah Pasang Angkur Bh 1.00 - - 13,756.25 13,756.25

Angkur - Ø 16 - L.300 MM Bh 1.00 - 13,756.25


Bahan Angkur - Ø 16 - L.300 MM Bh 1.00 - - -
Upah Pasang Angkur Bh 1.00 - - 13,756.25 13,756.25

Angkur - Ø 16 - L.350 MM Bh 1.00 - 13,756.25


Bahan Angkur - Ø 16 - L.350 MM Bh 1.00 - - -
Upah Pasang Angkur Bh 1.00 - - 13,756.25 13,756.25

Angkur - Ø 16 - L.400 MM Bh 1.00 - 13,756.25


Bahan Angkur - Ø 16 - L.400 MM Bh 1.00 - - -
Upah Pasang Angkur Bh 1.00 - - 13,756.25 13,756.25

Angkur - Ø 16 - L.500 MM Bh 1.00 - 13,756.25


Bahan Angkur - Ø 16 - L.500 MM Bh 1.00 - - -
Upah Pasang Angkur Bh 1.00 - - 13,756.25 13,756.25

Angkur - Ø 19 - L.200 MM Bh 1.00 - 13,756.25


Bahan Angkur - Ø 19 - L.200 MM Bh 1.00 - - -
Upah Pasang Angkur Bh 1.00 - - 13,756.25 13,756.25

Angkur - Ø 19 - L.300 MM Bh 1.00 - 13,756.25


Bahan Angkur - Ø 19 - L.300 MM Bh 1.00 - - -
Upah Pasang Angkur Bh 1.00 - - 13,756.25 13,756.25

29(253) Satuan Pekerjaan


515379445.xls

BAHAN UPAH
NO. JENIS PEKERJAAN SATUAN VOLUME
SATUAN TOTAL SATUAN TOTAL

Angkur - Ø 19 - L.400 MM Bh 1.00 - 13,756.25


Bahan Angkur - Ø 19 - L.400 MM Bh 1.00 - - -
Upah Pasang Angkur Bh 1.00 - - 13,756.25 13,756.25

Angkur - Ø 19 - L.500 MM Bh 1.00 - 13,756.25


Bahan Angkur - Ø 19 - L.500 MM Bh 1.00 - - -
Upah Pasang Angkur Bh 1.00 - - 13,756.25 13,756.25

Angkur - Ø 19 - L.600 MM Bh 1.00 - 13,756.25


Bahan Angkur - Ø 19 - L.500 MM Bh 1.00 - - -
Upah Pasang Angkur Bh 1.00 - - 13,756.25 13,756.25

Angkur - Ø 22 - L.300 MM Bh 1.00 - 13,756.25


Bahan Angkur - Ø 22 - L.300 MM Bh 1.00 - - -
Upah Pasang Angkur Bh 1.00 - - 13,756.25 13,756.25

Angkur - Ø 22 - L.400 MM Bh 1.00 - 13,756.25


Bahan Angkur - Ø 22 - L.400 MM Bh 1.00 - - -
Upah Pasang Angkur Bh 1.00 - - 13,756.25 13,756.25

Angkur - Ø 22 - L.500 MM Bh 1.00 - 13,756.25


Bahan Angkur - Ø 22 - L.500 MM Bh 1.00 - - -
Upah Pasang Angkur Bh 1.00 - - 13,756.25 13,756.25

Angkur - Ø 22 - L.600 MM Bh 1.00 - 13,756.25


Bahan Angkur - Ø 22 - L.600 MM Bh 1.00 - - -
Upah Pasang Angkur Bh 1.00 - - 13,756.25 13,756.25

Angkur - Ø 25 - L.300 MM Bh 1.00 - 13,756.25


Bahan Angkur - Ø 25 - L.300 MM Bh 1.00 - - -
Upah Pasang Angkur Bh 1.00 - - 13,756.25 13,756.25

30(253) Satuan Pekerjaan


515379445.xls

BAHAN UPAH
NO. JENIS PEKERJAAN SATUAN VOLUME
SATUAN TOTAL SATUAN TOTAL
Angkur - Ø 25 - L.350 MM Bh 1.00 - 13,756.25
Bahan Angkur - Ø 25 - L.350 MM Bh 1.00 - - -
Upah Pasang Angkur Bh 1.00 - - 13,756.25 13,756.25

Angkur - Ø 25 - L.400 MM Bh 1.00 - 13,756.25


Bahan Angkur - Ø 25 - L.400 MM Bh 1.00 - - -
Upah Pasang Angkur Bh 1.00 - - 13,756.25 13,756.25

Angkur - Ø 25 - L.500 MM Bh 1.00 - 13,756.25


Bahan Angkur - Ø 25 - L.500 MM Bh 1.00 - - -
Upah Pasang Angkur Bh 1.00 - - 13,756.25 13,756.25

Angkur - Ø 25 - L.600 MM Bh 1.00 - 13,756.25


Bahan Angkur - Ø 25 - L.600 MM Bh 1.00 - - -
Upah Pasang Angkur Bh 1.00 - - 13,756.25 13,756.25

Angkur - Ø 25 - L.800 MM Bh 1.00 - 13,756.25


Bahan Angkur - Ø 25 - L.800 MM Bh 1.00 - - -
Upah Pasang Angkur Bh 1.00 - - 13,756.25 13,756.25

Angkur - Ø 30 - L.400 MM Bh 1.00 - 13,756.25


Bahan Angkur - Ø 30 - L.400 MM Bh 1.00 - - -
Upah Pasang Angkur Bh 1.00 - - 13,756.25 13,756.25

Angkur - Ø 30 - L.450 MM Bh 1.00 - 13,756.25


Bahan Angkur - Ø 30 - L.450 MM Bh 1.00 - - -
Upah Pasang Angkur Bh 1.00 - - 13,756.25 13,756.25

Angkur - Ø 30 - L.800 MM Bh 1.00 - 13,756.25


Bahan Angkur - Ø 30 - L.800 MM Bh 1.00 - - -
Upah Pasang Angkur Bh 1.00 - - 13,756.25 13,756.25

Angkur - Ø 32 - L.1150 MM Bh 1.00 - 13,756.25

31(253) Satuan Pekerjaan


515379445.xls

BAHAN UPAH
NO. JENIS PEKERJAAN SATUAN VOLUME
SATUAN TOTAL SATUAN TOTAL
Bahan Angkur - Ø 32 - L.1150 MM Bh 1.00 - - -
Upah Pasang Angkur Bh 1.00 - - 13,756.25 13,756.25

Angkur - Ø 38 - L.2000 MM Bh 1.00 - 13,756.25


Bahan Angkur - Ø 38 - L.2000 MM Bh 1.00 - - -
Upah Pasang Angkur Bh 1.00 - - 13,756.25 13,756.25

PEKERJAAN KONSTRUKSI BAJA

MS - CNP 200X75X20X3.2 Kg 1.00 - 3,701.50


Bahan MS - CNP 200X75X20X3.2 Kg 1.05 - - -
Upah Fabrikasi / Ereksi Profil Baja CNP Kg 1.00 - - 3,701.50 3,701.50

MS - CNP 150X65X20X3.2 Kg 1.00 - 3,701.50


Bahan MS - CNP 150X65X20X3.2 Kg 1.05 - - -
Upah Fabrikasi / Ereksi Profil Baja CNP Kg 1.00 - - 3,701.50 3,701.50

MS - CNP 150X50X20X3.2 Kg 1.00 - 3,701.50


Bahan MS - CNP 150X50X20X3.2 Kg 1.02 - - -
Upah Fabrikasi / Ereksi Profil Baja CNP Kg 1.00 - - 3,701.50 3,701.50

MS - CNP 150X50X20X2.3 Kg 1.00 - 3,701.50


Bahan MS - CNP 150X50X20X2.3 Kg 1.05 - - -
Upah Fabrikasi / Ereksi Profil Baja CNP Kg 1.00 - - 3,701.50 3,701.50

MS - CNP 125X50X20X3.2 Kg 1.00 - 3,701.50


Bahan MS - CNP 125X50X20X3.2 Kg 1.05 - - -
Upah Fabrikasi / Ereksi Profil Baja CNP Kg 1.00 - - 3,701.50 3,701.50

MS - CNP 125X50X20X2.3 Kg 1.00 - 3,701.50


Bahan MS - CNP 125X50X20X2.3 Kg 1.02 - - -
Upah Fabrikasi / Ereksi Profil Baja CNP Kg 1.00 - - 3,701.50 3,701.50

32(253) Satuan Pekerjaan


515379445.xls

BAHAN UPAH
NO. JENIS PEKERJAAN SATUAN VOLUME
SATUAN TOTAL SATUAN TOTAL
MS - CNP 100X50X20X3.2 Kg 1.00 - 3,701.50
Bahan MS - CNP 100X50X20X3.2 Kg 1.05 - - -
Upah Fabrikasi / Ereksi Profil Baja CNP Kg 1.00 - - 3,701.50 3,701.50

MS - CNP 100X50X20X2.3 Kg 1.00 - 3,701.50


Bahan MS - CNP 100X50X20X2.3 Kg 1.05 - - -
Upah Fabrikasi / Ereksi Profil Baja CNP Kg 1.00 - - 3,701.50 3,701.50

MS - CNP 100X50X20X1.6 Kg 1.00 - 3,701.50


Bahan MS - CNP 100X50X20X1.6 Kg 1.05 - - -
Upah Fabrikasi / Ereksi Profil Baja CNP Kg 1.00 - - 3,701.50 3,701.50

MS - CNP 75X45X15X2.3 Kg 1.00 - 3,701.50


Bahan MS - CNP 75X45X15X2.3 Kg 1.05 - - -
Upah Fabrikasi / Ereksi Profil Baja CNP Kg 1.00 - - 3,701.50 3,701.50

MS - CNP 75X45X15X1.6 Kg 1.00 - 3,701.50


Bahan MS - CNP 75X45X15X1.6 Kg 1.05 - - -
Upah Fabrikasi / Ereksi Profil Baja CNP Kg 1.00 - - 3,701.50 3,701.50

MS - CNP 60X30X10X1.6 Kg 1.00 - 3,701.50


Bahan MS - CNP 60X30X10X1.6 Kg 1.05 - - -
Upah Fabrikasi / Ereksi Profil Baja CNP Kg 1.00 - - 3,701.50 3,701.50

MS - L 20X20X3 Kg 1.00 - 3,701.50


Bahan MS - L 20X20X3 Kg 1.05 - - -
Upah Fabrikasi / Ereksi Profil Baja L Kg 1.00 - - 3,701.50 3,701.50

MS - L 25X25X3 Kg 1.00 - 3,701.50


Bahan MS - L 25X25X3 Kg 1.05 - - -
Upah Fabrikasi / Ereksi Profil Baja L Kg 1.00 - - 3,701.50 3,701.50

MS - L 25X25X5 Kg 1.00 - 3,701.50

33(253) Satuan Pekerjaan


515379445.xls

BAHAN UPAH
NO. JENIS PEKERJAAN SATUAN VOLUME
SATUAN TOTAL SATUAN TOTAL
Bahan MS - L 25X25X5 Kg 1.05 - - -
Upah Fabrikasi / Ereksi Profil Baja L Kg 1.00 - - 3,701.50 3,701.50

MS - L 30X30X3 Kg 1.00 - 3,701.50


Bahan MS - L 30X30X3 Kg 1.05 - - -
Upah Fabrikasi / Ereksi Profil Baja L Kg 1.00 - - 3,701.50 3,701.50

MS - L 40X40X3 Kg 1.00 - 3,701.50


Bahan MS - L 40X40X3 Kg 1.05 - - -
Upah Fabrikasi / Ereksi Profil Baja L Kg 1.00 - - 3,701.50 3,701.50

MS - L 40X40X4 Kg 1.00 - 3,701.50


Bahan MS - L 40X40X4 Kg 1.05 - - -
Upah Fabrikasi / Ereksi Profil Baja L Kg 1.00 - - 3,701.50 3,701.50

MS - L 40X40X5 Kg 1.00 - 3,701.50


Bahan MS - L 40X40X5 Kg 1.05 - - -
Upah Fabrikasi / Ereksi Profil Baja L Kg 1.00 - - 3,701.50 3,701.50

MS - L 45X45X4 Kg 1.00 - 3,701.50


Bahan MS - L 45X45X4 Kg 1.05 - - -
Upah Fabrikasi / Ereksi Profil Baja L Kg 1.00 - - 3,701.50 3,701.50

MS - L 45X45X5 Kg 1.00 - 3,701.50


Bahan MS - L 45X45X5 Kg 1.05 - - -
Upah Fabrikasi / Ereksi Profil Baja L Kg 1.00 - - 3,701.50 3,701.50

MS - L 50X50X4 Kg 1.00 - 3,701.50


Bahan MS - L 50X50X4 Kg 1.05 - - -
Upah Fabrikasi / Ereksi Profil Baja L Kg 1.00 - - 3,701.50 3,701.50

MS - L 50X50X5 Kg 1.00 - 3,701.50


Bahan MS - L 50X50X5 Kg 1.03 - - -

34(253) Satuan Pekerjaan


515379445.xls

BAHAN UPAH
NO. JENIS PEKERJAAN SATUAN VOLUME
SATUAN TOTAL SATUAN TOTAL
Upah Fabrikasi / Ereksi Profil Baja L Kg 1.00 - - 3,701.50 3,701.50

MS - L 50X50X6 Kg 1.00 - 3,701.50


Bahan MS - L 50X50X6 Kg 1.03 - - -
Upah Fabrikasi / Ereksi Profil Baja L Kg 1.00 - - 3,701.50 3,701.50

MS - L 60X60X5 Kg 1.00 - 3,701.50


Bahan MS - L 60X60X5 Kg 1.03 - - -
Upah Fabrikasi / Ereksi Profil Baja L Kg 1.00 - - 3,701.50 3,701.50

MS - L 60X60X6 Kg 1.00 - 3,701.50


Bahan MS - L 60X60X6 Kg 1.03 - - -
Upah Fabrikasi / Ereksi Profil Baja L Kg 1.00 - - 3,701.50 3,701.50

MS - L 65X65X6 Kg 1.00 - 3,701.50


Bahan MS - L 65X65X6 Kg 1.03 - - -
Upah Fabrikasi / Ereksi Profil Baja L Kg 1.00 - - 3,701.50 3,701.50

MS - L 70X70X6 Kg 1.00 - 3,701.50


Bahan MS - L 70X70X6 Kg 1.03 - - -
Upah Fabrikasi / Ereksi Profil Baja L Kg 1.00 - - 3,701.50 3,701.50

MS - L 70X70X7 Kg 1.00 - 3,701.50


Bahan MS - L 70X70X7 Kg 1.03 - - -
Upah Fabrikasi / Ereksi Profil Baja L Kg 1.00 - - 3,701.50 3,701.50

MS - L 75X75X6 Kg 1.00 - 3,701.50


Bahan MS - L 75X75X6 Kg 1.03 - - -
Upah Fabrikasi / Ereksi Profil Baja L Kg 1.00 - - 3,701.50 3,701.50

MS - L 75X75X7 Kg 1.00 - 3,701.50


Bahan MS - L 75X75X7 Kg 1.03 - - -
Upah Fabrikasi / Ereksi Profil Baja L Kg 1.00 - - 3,701.50 3,701.50

35(253) Satuan Pekerjaan


515379445.xls

BAHAN UPAH
NO. JENIS PEKERJAAN SATUAN VOLUME
SATUAN TOTAL SATUAN TOTAL

MS - L 75X75X8 Kg 1.00 - 3,701.50


Bahan MS - L 75X75X8 Kg 1.03 - - -
Upah Fabrikasi / Ereksi Profil Baja L Kg 1.00 - - 3,701.50 3,701.50

MS - L 80X80X8 Kg 1.00 - 3,701.50


Bahan MS - L 80X80X8 Kg 1.03 - - -
Upah Fabrikasi / Ereksi Profil Baja L Kg 1.00 - - 3,701.50 3,701.50

MS - L 90X90X8 Kg 1.00 - 3,701.50


Bahan MS - L 90X90X8 Kg 1.03 - - -
Upah Fabrikasi / Ereksi Profil Baja L Kg 1.00 - - 3,701.50 3,701.50

MS - L 90X90X9 Kg 1.00 - 3,701.50


Bahan MS - L 90X90X9 Kg 1.03 - - -
Upah Fabrikasi / Ereksi Profil Baja L Kg 1.00 - - 3,701.50 3,701.50

MS - L 90X90X10 Kg 1.00 - 3,701.50


Bahan MS - L 90X90X10 Kg 1.03 - - -
Upah Fabrikasi / Ereksi Profil Baja L Kg 1.00 - - 3,701.50 3,701.50

MS - L 100X100X8 Kg 1.00 - 3,701.50


Bahan MS - L 100X100X8 Kg 1.03 - - -
Upah Fabrikasi / Ereksi Profil Baja L Kg 1.00 - - 3,701.50 3,701.50

MS - L 100X100X10 Kg 1.00 - 3,701.50


Bahan MS - L 100X100X10 Kg 1.05 - - -
Upah Fabrikasi / Ereksi Profil Baja L Kg 1.00 - - 3,701.50 3,701.50

MS - L 120X120X11 Kg 1.00 - 3,701.50


Bahan MS - L 120X120X11 Kg 1.05 - - -
Upah Fabrikasi / Ereksi Profil Baja L Kg 1.00 - - 3,701.50 3,701.50

36(253) Satuan Pekerjaan


515379445.xls

BAHAN UPAH
NO. JENIS PEKERJAAN SATUAN VOLUME
SATUAN TOTAL SATUAN TOTAL
MS - L 125X125X12 Kg 1.00 - 3,701.50
Bahan MS - L 125X125X12 Kg 1.05 - - -
Upah Fabrikasi / Ereksi Profil Baja L Kg 1.00 - - 3,701.50 3,701.50

MS - L 130X130X9 Kg 1.00 - 3,701.50


Bahan MS - L 130X130X9 Kg 1.05 - - -
Upah Fabrikasi / Ereksi Profil Baja L Kg 1.00 - - 3,701.50 3,701.50

MS - L 130X130X12 Kg 1.00 - 3,701.50


Bahan MS - L 130X130X12 Kg 1.05 - - -
Upah Fabrikasi / Ereksi Profil Baja L Kg 1.00 - - 3,701.50 3,701.50

MS - L 150X150X12 Kg 1.00 - 3,701.50


Bahan MS - L 150X150X12 Kg 1.05 - - -
Upah Fabrikasi / Ereksi Profil Baja L Kg 1.00 - - 3,701.50 3,701.50

MS - L 150X150X15 Kg 1.00 - 3,701.50


Bahan MS - L 150X150X15 Kg 1.05 - - -
Upah Fabrikasi / Ereksi Profil Baja L Kg 1.00 - - 3,701.50 3,701.50

MS - L 200X200X15 Kg 1.00 - 3,701.50


Bahan MS - L 200X200X15 Kg 1.05 - - -
Upah Fabrikasi / Ereksi Profil Baja L Kg 1.00 - - 3,701.50 3,701.50

MS - L 200X200X20 Kg 1.00 - 3,701.50


Bahan MS - L 200X200X20 Kg 1.05 - - -
Upah Fabrikasi / Ereksi Profil Baja L Kg 1.00 - - 3,701.50 3,701.50

MS - L 200X200X25 Kg 1.00 - 3,701.50


Bahan MS - L 200X200X25 Kg 1.05 - - -
Upah Fabrikasi / Ereksi Profil Baja L Kg 1.00 - - 3,701.50 3,701.50

MS - L 250X250X25 Kg 1.00 - 3,701.50

37(253) Satuan Pekerjaan


515379445.xls

BAHAN UPAH
NO. JENIS PEKERJAAN SATUAN VOLUME
SATUAN TOTAL SATUAN TOTAL
Bahan MS - L 250X250X25 Kg 1.05 - - -
Upah Fabrikasi / Ereksi Profil Baja L Kg 1.00 - - 3,701.50 3,701.50

MS - PELAT BORDES 4.5 mm Kg 1.00 - 3,701.50


Bahan MS - PELAT BORDES 4.5 mm Kg 1.03 - - -
Upah Fabrikasi / Ereksi Pelat Baja Kg 1.00 - - 3,701.50 3,701.50

MS - PELAT BORDES 6 mm Kg 1.00 - 3,701.50


Bahan MS - PELAT BORDES 6 mm Kg 1.03 - - -
Upah Fabrikasi / Ereksi Pelat Baja Kg 1.00 - - 3,701.50 3,701.50

EXPANDED METAL M² 1.00 - #N/A


Bahan EXPANDED METAL M² 1.05 - - -
Upah Fabrikasi / Ereksi Expanded Metal M² 1.00 - - #N/A #N/A

MS - PELAT 1.2 mm Kg 1.00 - 3,701.50


Bahan MS - PELAT 1.2 mm Kg 1.07 - - -
Upah Fabrikasi / Ereksi Pelat Baja Kg 1.00 - - 3,701.50 3,701.50

MS - PELAT 1.4 mm Kg 1.00 - 3,701.50


Bahan MS - PELAT 1.4 mm Kg 1.07 - - -
Upah Fabrikasi / Ereksi Pelat Baja Kg 1.00 - - 3,701.50 3,701.50

MS - PELAT 1.5 mm Kg 1.00 - 3,701.50


Bahan MS - PELAT 1.5 mm Kg 1.07 - - -
Upah Fabrikasi / Ereksi Pelat Baja Kg 1.00 - - 3,701.50 3,701.50

MS - PELAT 1.9 mm Kg 1.00 - 3,701.50


Bahan MS - PELAT 1.9 mm Kg 1.07 - - -
Upah Fabrikasi / Ereksi Pelat Baja Kg 1.00 - - 3,701.50 3,701.50

MS - PELAT 2 mm Kg 1.00 - 3,701.50


Bahan MS - PELAT 2 mm Kg 1.07 - - -

38(253) Satuan Pekerjaan


515379445.xls

BAHAN UPAH
NO. JENIS PEKERJAAN SATUAN VOLUME
SATUAN TOTAL SATUAN TOTAL
Upah Fabrikasi / Ereksi Pelat Baja Kg 1.00 - - 3,701.50 3,701.50

MS - PELAT 2.3 mm Kg 1.00 - 3,701.50


Bahan MS - PELAT 2.3 mm Kg 1.07 - - -
Upah Fabrikasi / Ereksi Pelat Baja Kg 1.00 - - 3,701.50 3,701.50

MS - PELAT 2.6 mm Kg 1.00 - 3,701.50


Bahan MS - PELAT 2.6 mm Kg 1.07 - - -
Upah Fabrikasi / Ereksi Pelat Baja Kg 1.00 - - 3,701.50 3,701.50

MS - PELAT 2.8 mm Kg 1.00 - 3,701.50


Bahan MS - PELAT 2.8 mm Kg 1.07 - - -
Upah Fabrikasi / Ereksi Pelat Baja Kg 1.00 - - 3,701.50 3,701.50

MS - PELAT 2.9 mm Kg 1.00 - 3,701.50


Bahan MS - PELAT 2.9 mm Kg 1.07 - - -
Upah Fabrikasi / Ereksi Pelat Baja Kg 1.00 - - 3,701.50 3,701.50

MS - PELAT 3 mm Kg 1.00 - 3,701.50


Bahan MS - PELAT 3 mm Kg 1.07 - - -
Upah Fabrikasi / Ereksi Pelat Baja Kg 1.00 - - 3,701.50 3,701.50

MS - PELAT 3.2 mm Kg 1.00 - 3,701.50


Bahan MS - PELAT 3.2 mm Kg 1.07 - - -
Upah Fabrikasi / Ereksi Pelat Baja Kg 1.00 - - 3,701.50 3,701.50

MS - PELAT 4 mm Kg 1.00 - 3,701.50


Bahan MS - PELAT 4 mm Kg 1.07 - - -
Upah Fabrikasi / Ereksi Pelat Baja Kg 1.00 - - 3,701.50 3,701.50

MS - PELAT 4.5 mm Kg 1.00 - 3,701.50


Bahan MS - PELAT 4.5 mm Kg 1.07 - - -
Upah Fabrikasi / Ereksi Pelat Baja Kg 1.00 - - 3,701.50 3,701.50

39(253) Satuan Pekerjaan


515379445.xls

BAHAN UPAH
NO. JENIS PEKERJAAN SATUAN VOLUME
SATUAN TOTAL SATUAN TOTAL

MS - PELAT 5 mm Kg 1.00 - 3,701.50


Bahan MS - PELAT 5 mm Kg 1.07 - - -
Upah Fabrikasi / Ereksi Pelat Baja Kg 1.00 - - 3,701.50 3,701.50

MS - PELAT 6 mm Kg 1.00 - 3,701.50


Bahan MS - PELAT 6 mm Kg 1.07 - - -
Upah Fabrikasi / Ereksi Pelat Baja Kg 1.00 - - 3,701.50 3,701.50

MS - PELAT 8 mm Kg 1.00 - 3,701.50


Bahan MS - PELAT 8 mm Kg 1.07 - - -
Upah Fabrikasi / Ereksi Pelat Baja Kg 1.00 - - 3,701.50 3,701.50

MS - PELAT 9 mm Kg 1.00 - 3,701.50


Bahan MS - PELAT 9 mm Kg 1.07 - - -
Upah Fabrikasi / Ereksi Pelat Baja Kg 1.00 - - 3,701.50 3,701.50

MS - PELAT 10 mm Kg 1.00 - 3,701.50


Bahan MS - PELAT 10 mm Kg 1.05 - - -
Upah Fabrikasi / Ereksi Pelat Baja Kg 1.00 - - 3,701.50 3,701.50

MS - PELAT 12 mm Kg 1.00 - 3,701.50


Bahan MS - PELAT 12 mm Kg 1.05 - - -
Upah Fabrikasi / Ereksi Pelat Baja Kg 1.00 - - 3,701.50 3,701.50

MS - PELAT 13 mm Kg 1.00 - 3,701.50


Bahan MS - PELAT 13 mm Kg 1.05 - - -
Upah Fabrikasi / Ereksi Pelat Baja Kg 1.00 - - 3,701.50 3,701.50

MS - PELAT 15 mm Kg 1.00 - 3,701.50


Bahan MS - PELAT 15 mm Kg 1.05 - - -
Upah Fabrikasi / Ereksi Pelat Baja Kg 1.00 - - 3,701.50 3,701.50

40(253) Satuan Pekerjaan


515379445.xls

BAHAN UPAH
NO. JENIS PEKERJAAN SATUAN VOLUME
SATUAN TOTAL SATUAN TOTAL
MS - PELAT 16 mm Kg 1.00 - 3,701.50
Bahan MS - PELAT 16 mm Kg 1.05 - - -
Upah Fabrikasi / Ereksi Pelat Baja Kg 1.00 - - 3,701.50 3,701.50

MS - PELAT 18 mm Kg 1.00 - 3,701.50


Bahan MS - PELAT 18 mm Kg 1.05 - - -
Upah Fabrikasi / Ereksi Pelat Baja Kg 1.00 - - 3,701.50 3,701.50

MS - PELAT 19 mm Kg 1.00 - 3,701.50


Bahan MS - PELAT 19 mm Kg 1.05 - - -
Upah Fabrikasi / Ereksi Pelat Baja Kg 1.00 - - 3,701.50 3,701.50

MS - PELAT 20 mm Kg 1.00 - 3,701.50


Bahan MS - PELAT 20 mm Kg 1.05 - - -
Upah Fabrikasi / Ereksi Pelat Baja Kg 1.00 - - 3,701.50 3,701.50

MS - PELAT 21 mm Kg 1.00 - 3,701.50


Bahan MS - PELAT 21 mm Kg 1.05 - - -
Upah Fabrikasi / Ereksi Pelat Baja Kg 1.00 - - 3,701.50 3,701.50

MS - PELAT 22 mm Kg 1.00 - 3,701.50


Bahan MS - PELAT 22 mm Kg 1.05 - - -
Upah Fabrikasi / Ereksi Pelat Baja Kg 1.00 - - 3,701.50 3,701.50

MS - PELAT 25 mm Kg 1.00 - 3,701.50


Bahan MS - PELAT 25 mm Kg 1.05 - - -
Upah Fabrikasi / Ereksi Pelat Baja Kg 1.00 - - 3,701.50 3,701.50

MS - PELAT 28 mm Kg 1.00 - 3,701.50


Bahan MS - PELAT 28 mm Kg 1.05 - - -
Upah Fabrikasi / Ereksi Pelat Baja Kg 1.00 - - 3,701.50 3,701.50

MS - PELAT 30 mm Kg 1.00 - 3,701.50

41(253) Satuan Pekerjaan


515379445.xls

BAHAN UPAH
NO. JENIS PEKERJAAN SATUAN VOLUME
SATUAN TOTAL SATUAN TOTAL
Bahan MS - PELAT 30 mm Kg 1.05 - - -
Upah Fabrikasi / Ereksi Pelat Baja Kg 1.00 - - 3,701.50 3,701.50

MS - PELAT 32 mm Kg 1.00 - 3,701.50


Bahan MS - PELAT 32 mm Kg 1.05 - - -
Upah Fabrikasi / Ereksi Pelat Baja Kg 1.00 - - 3,701.50 3,701.50

MS - PELAT 38 mm Kg 1.00 - 3,701.50


Bahan MS - PELAT 38 mm Kg 1.05 - - -
Upah Fabrikasi / Ereksi Pelat Baja Kg 1.00 - - 3,701.50 3,701.50

MS - PELAT 40 mm Kg 1.00 - 3,701.50


Bahan MS - PELAT 40 mm Kg 1.05 - - -
Upah Fabrikasi / Ereksi Pelat Baja Kg 1.00 - - 3,701.50 3,701.50

MS - PELAT 50 mm Kg 1.00 - 3,701.50


Bahan MS - PELAT 50 mm Kg 1.05 - - -
Upah Fabrikasi / Ereksi Pelat Baja Kg 1.00 - - 3,701.50 3,701.50

MS - PELAT 65 mm Kg 1.00 - 3,701.50


Bahan MS - PELAT 65 mm Kg 1.05 - - -
Upah Fabrikasi / Ereksi Pelat Baja Kg 1.00 - - 3,701.50 3,701.50

MS - PELAT 75 mm Kg 1.00 - 3,701.50


Bahan MS - PELAT 75 mm Kg 1.05 - - -
Upah Fabrikasi / Ereksi Pelat Baja Kg 1.00 - - 3,701.50 3,701.50

MS - PELAT 100 mm Kg 1.00 - 3,701.50


Bahan MS - PELAT 100 mm Kg 1.05 - - -
Upah Fabrikasi / Ereksi Pelat Baja Kg 1.00 - - 3,701.50 3,701.50

MS - PELAT STRIP 3 X 19 MM Kg 1.00 - 3,701.50


Bahan MS - PELAT STRIP 3 X 19 MM Kg 1.05 - - -

42(253) Satuan Pekerjaan


515379445.xls

BAHAN UPAH
NO. JENIS PEKERJAAN SATUAN VOLUME
SATUAN TOTAL SATUAN TOTAL
Upah Fabrikasi / Ereksi Pelat Baja Kg 1.00 - - 3,701.50 3,701.50

MS - PELAT STRIP 3 X 25 MM Kg 1.00 - 3,701.50


Bahan MS - PELAT STRIP 3 X 25 MM Kg 1.05 - - -
Upah Fabrikasi / Ereksi Pelat Baja Kg 1.00 - - 3,701.50 3,701.50

MS - PELAT STRIP 3 X 30 MM Kg 1.00 - 3,701.50


Bahan MS - PELAT STRIP 3 X 30 MM Kg 1.05 - - -
Upah Fabrikasi / Ereksi Pelat Baja Kg 1.00 - - 3,701.50 3,701.50

MS - PELAT STRIP 4 X 19 MM Kg 1.00 - 3,701.50


Bahan MS - PELAT STRIP 4 X 19 MM Kg 1.05 - - -
Upah Fabrikasi / Ereksi Pelat Baja Kg 1.00 - - 3,701.50 3,701.50

MS - PELAT STRIP 4 X 25 MM Kg 1.00 - 3,701.50


Bahan MS - PELAT STRIP 4 X 25 MM Kg 1.05 - - -
Upah Fabrikasi / Ereksi Pelat Baja Kg 1.00 - - 3,701.50 3,701.50

MS - PELAT STRIP 4 X 30 MM Kg 1.00 - 3,701.50


Bahan MS - PELAT STRIP 4 X 30 MM Kg 1.05 - - -
Upah Fabrikasi / Ereksi Pelat Baja Kg 1.00 - - 3,701.50 3,701.50

MS - PELAT STRIP 4 X 38 MM Kg 1.00 - 3,701.50


Bahan MS - PELAT STRIP 4 X 38 MM Kg 1.05 - - -
Upah Fabrikasi / Ereksi Pelat Baja Kg 1.00 - - 3,701.50 3,701.50

MS - PELAT STRIP 5 X 19 MM Kg 1.00 - 3,701.50


Bahan MS - PELAT STRIP 5 X 19 MM Kg 1.05 - - -
Upah Fabrikasi / Ereksi Pelat Baja Kg 1.00 - - 3,701.50 3,701.50

MS - PELAT STRIP 5 X 25 MM Kg 1.00 - 3,701.50


Bahan MS - PELAT STRIP 5 X 25 MM Kg 1.05 - - -
Upah Fabrikasi / Ereksi Pelat Baja Kg 1.00 - - 3,701.50 3,701.50

43(253) Satuan Pekerjaan


515379445.xls

BAHAN UPAH
NO. JENIS PEKERJAAN SATUAN VOLUME
SATUAN TOTAL SATUAN TOTAL

MS - PELAT STRIP 5 X 30 MM Kg 1.00 - 3,701.50


Bahan MS - PELAT STRIP 5 X 30 MM Kg 1.05 - - -
Upah Fabrikasi / Ereksi Pelat Baja Kg 1.00 - - 3,701.50 3,701.50

MS - PELAT STRIP 5 X 38 MM Kg 1.00 - 3,701.50


Bahan MS - PELAT STRIP 5 X 38 MM Kg 1.05 - - -
Upah Fabrikasi / Ereksi Pelat Baja Kg 1.00 - - 3,701.50 3,701.50

MS - PELAT STRIP 5 X 50 MM Kg 1.00 - 3,701.50


Bahan MS - PELAT STRIP 5 X 50 MM Kg 1.05 - - -
Upah Fabrikasi / Ereksi Pelat Baja Kg 1.00 - - 3,701.50 3,701.50

MS - PELAT STRIP 6 X 150 MM Kg 1.00 - 3,701.50


Bahan MS - PELAT STRIP 6 X 150 MM Kg 1.05 - - -
Upah Fabrikasi / Ereksi Pelat Baja Kg 1.00 - - 3,701.50 3,701.50

MS - PELAT STRIP 8 X 38 MM Kg 1.00 - 3,701.50


Bahan MS - PELAT STRIP 8 X 38 MM Kg 1.05 - - -
Upah Fabrikasi / Ereksi Pelat Baja Kg 1.00 - - 3,701.50 3,701.50

MS - PELAT STRIP 9 X 125 MM Kg 1.00 - 3,701.50


Bahan MS - PELAT STRIP 9 X 125 MM Kg 1.05 - - -
Upah Fabrikasi / Ereksi Pelat Baja Kg 1.00 - - 3,701.50 3,701.50

MS - PELAT STRIP 9 X 150 MM Kg 1.00 - 3,701.50


Bahan MS - PELAT STRIP 9 X 150 MM Kg 1.05 - - -
Upah Fabrikasi / Ereksi Pelat Baja Kg 1.00 - - 3,701.50 3,701.50

MS - SQ BAR - 9X9 MM Kg 1.00 - 3,701.50


Bahan MS - SQ BAR - 9X9 MM Kg 1.05 - - -
Upah Fabrikasi / Ereksi Profil Baja Square Bar Kg 1.00 - - 3,701.50 3,701.50

44(253) Satuan Pekerjaan


515379445.xls

BAHAN UPAH
NO. JENIS PEKERJAAN SATUAN VOLUME
SATUAN TOTAL SATUAN TOTAL
MS - SQ BAR - 12X12 MM Kg 1.00 - 3,701.50
Bahan MS - SQ BAR - 12X12 MM Kg 1.05 - - -
Upah Fabrikasi / Ereksi Profil Baja Square Bar Kg 1.00 - - 3,701.50 3,701.50

MS - SQ BAR - 16X16 MM Kg 1.00 - 3,701.50


Bahan MS - SQ BAR - 16X16 MM Kg 1.05 - - -
Upah Fabrikasi / Ereksi Profil Baja Square Bar Kg 1.00 - - 3,701.50 3,701.50

MS - SQ BAR - 19X19 MM Kg 1.00 - 3,701.50


Bahan MS - SQ BAR - 19X19 MM Kg 1.05 - - -
Upah Fabrikasi / Ereksi Profil Baja Square Bar Kg 1.00 - - 3,701.50 3,701.50

MS - SQ BAR - 22X22 MM Kg 1.00 - 3,701.50


Bahan MS - SQ BAR - 22X22 MM Kg 1.05 - - -
Upah Fabrikasi / Ereksi Profil Baja Square Bar Kg 1.00 - - 3,701.50 3,701.50

MS - SQ BAR - 25X25 MM Kg 1.00 - 3,701.50


Bahan MS - SQ BAR - 25X25 MM Kg 1.05 - - -
Upah Fabrikasi / Ereksi Profil Baja Square Bar Kg 1.00 - - 3,701.50 3,701.50

MS - SQ BAR - 28X28 MM Kg 1.00 - 3,701.50


Bahan MS - SQ BAR - 28X28 MM Kg 1.05 - - -
Upah Fabrikasi / Ereksi Profil Baja Square Bar Kg 1.00 - - 3,701.50 3,701.50

MS - SQ BAR - 32X32 MM Kg 1.00 - 3,701.50


Bahan MS - SQ BAR - 32X32 MM Kg 1.05 - - -
Upah Fabrikasi / Ereksi Profil Baja Square Bar Kg 1.00 - - 3,701.50 3,701.50

MS - SQ BAR - 38X38 MM Kg 1.00 - 3,701.50


Bahan MS - SQ BAR - 38X38 MM Kg 1.05 - - -
Upah Fabrikasi / Ereksi Profil Baja Square Bar Kg 1.00 - - 3,701.50 3,701.50

MS - SQ BAR - 44X44 MM Kg 1.00 - 3,701.50

45(253) Satuan Pekerjaan


515379445.xls

BAHAN UPAH
NO. JENIS PEKERJAAN SATUAN VOLUME
SATUAN TOTAL SATUAN TOTAL
Bahan MS - SQ BAR - 44X44 MM Kg 1.05 - - -
Upah Fabrikasi / Ereksi Profil Baja Square Bar Kg 1.00 - - 3,701.50 3,701.50

MS - SQ BAR - 50X50 MM Kg 1.00 - 3,701.50


Bahan MS - SQ BAR - 50X50 MM Kg 1.05 - - -
Upah Fabrikasi / Ereksi Profil Baja Square Bar Kg 1.00 - - 3,701.50 3,701.50

MS - SQ BAR - 65X65 MM Kg 1.00 - 3,701.50


Bahan MS - SQ BAR - 65X65 MM Kg 1.05 - - -
Upah Fabrikasi / Ereksi Profil Baja Square Bar Kg 1.00 - - 3,701.50 3,701.50

MS - UNP 50X39X5X7 Kg 1.00 - 3,701.50


Bahan MS - UNP 50X39X5X7 Kg 1.03 - - -
Upah Fabrikasi / Ereksi Profil Baja UNP Kg 1.00 - - 3,701.50 3,701.50

MS - UNP 65X42X5.5X7.5 Kg 1.00 - 3,701.50


Bahan MS - UNP 65X42X5.5X7.5 Kg 1.03 - - -
Upah Fabrikasi / Ereksi Profil Baja UNP Kg 1.00 - - 3,701.50 3,701.50

MS - UNP 75X40X5X7 Kg 1.00 - 3,701.50


Bahan MS - UNP 75X40X5X7 Kg 1.03 - - -
Upah Fabrikasi / Ereksi Profil Baja UNP Kg 1.00 - - 3,701.50 3,701.50

MS - UNP 80X45X6X8 Kg 1.00 - 3,701.50


Bahan MS - UNP 80X45X6X8 Kg 1.03 - - -
Upah Fabrikasi / Ereksi Profil Baja UNP Kg 1.00 - - 3,701.50 3,701.50

MS - UNP 100X50X5X7.5 Kg 1.00 - 3,701.50


Bahan MS - UNP 100X50X5X7.5 Kg 1.03 - - -
Upah Fabrikasi / Ereksi Profil Baja UNP Kg 1.00 - - 3,701.50 3,701.50

MS - UNP 120X55X7X9 Kg 1.00 - 3,701.50


Bahan MS - UNP 120X55X7X9 Kg 1.03 - - -

46(253) Satuan Pekerjaan


515379445.xls

BAHAN UPAH
NO. JENIS PEKERJAAN SATUAN VOLUME
SATUAN TOTAL SATUAN TOTAL
Upah Fabrikasi / Ereksi Profil Baja UNP Kg 1.00 - - 3,701.50 3,701.50

MS - UNP 125X65X6X8 Kg 1.00 - 3,701.50


Bahan MS - UNP 125X65X6X8 Kg 1.03 - - -
Upah Fabrikasi / Ereksi Profil Baja UNP Kg 1.00 - - 3,701.50 3,701.50

MS - UNP 140X60X7X10 Kg 1.00 - 3,701.50


Bahan MS - UNP 140X60X7X10 Kg 1.03 - - -
Upah Fabrikasi / Ereksi Profil Baja UNP Kg 1.00 - - 3,701.50 3,701.50

MS - UNP 150X75X6.5X10 Kg 1.00 - 3,701.50


Bahan MS - UNP 150X75X6.5X10 Kg 1.03 - - -
Upah Fabrikasi / Ereksi Profil Baja UNP Kg 1.00 - - 3,701.50 3,701.50

MS - UNP 160X65X7.5X10.5 Kg 1.00 - 3,701.50


Bahan MS - UNP 160X65X7.5X10.5 Kg 1.03 - - -
Upah Fabrikasi / Ereksi Profil Baja UNP Kg 1.00 - - 3,701.50 3,701.50

MS - UNP 180X70X8X11 Kg 1.00 - 3,701.50


Bahan MS - UNP 180X70X8X11 Kg 1.03 - - -
Upah Fabrikasi / Ereksi Profil Baja UNP Kg 1.00 - - 3,701.50 3,701.50

MS - UNP 180X75X7X10.5 Kg 1.00 - 3,701.50


Bahan MS - UNP 180X75X7X10.5 Kg 1.03 - - -
Upah Fabrikasi / Ereksi Profil Baja UNP Kg 1.00 - - 3,701.50 3,701.50

MS - UNP 200X75X8.5X11.5 Kg 1.00 - 3,701.50


Bahan MS - UNP 200X75X8.5X11.5 Kg 1.03 - - -
Upah Fabrikasi / Ereksi Profil Baja UNP Kg 1.00 - - 3,701.50 3,701.50

MS - UNP 200X80X7.5X11 Kg 1.00 - 3,701.50


Bahan MS - UNP 200X80X7.5X11 Kg 1.03 - - -
Upah Fabrikasi / Ereksi Profil Baja UNP Kg 1.00 - - 3,701.50 3,701.50

47(253) Satuan Pekerjaan


515379445.xls

BAHAN UPAH
NO. JENIS PEKERJAAN SATUAN VOLUME
SATUAN TOTAL SATUAN TOTAL

MS - UNP 220X80X9X12.5 Kg 1.00 - 3,701.50


Bahan MS - UNP 220X80X9X12.5 Kg 1.03 - - -
Upah Fabrikasi / Ereksi Profil Baja UNP Kg 1.00 - - 3,701.50 3,701.50

MS - UNP 240X85X9.5X13 Kg 1.00 - 3,701.50


Bahan MS - UNP 240X85X9.5X13 Kg 1.03 - - -
Upah Fabrikasi / Ereksi Profil Baja UNP Kg 1.00 - - 3,701.50 3,701.50

MS - UNP 250X90X9X13 Kg 1.00 - 3,701.50


Bahan MS - UNP 250X90X9X13 Kg 1.03 - - -
Upah Fabrikasi / Ereksi Profil Baja UNP Kg 1.00 - - 3,701.50 3,701.50

MS - UNP 260X90X10X14 Kg 1.00 - 3,701.50


Bahan MS - UNP 260X90X10X14 Kg 1.03 - - -
Upah Fabrikasi / Ereksi Profil Baja UNP Kg 1.00 - - 3,701.50 3,701.50

MS - UNP 280X95X10X15 Kg 1.00 - 3,701.50


Bahan MS - UNP 280X95X10X15 Kg 1.03 - - -
Upah Fabrikasi / Ereksi Profil Baja UNP Kg 1.00 - - 3,701.50 3,701.50

MS - UNP 300X90X9X13 Kg 1.00 - 3,701.50


Bahan MS - UNP 300X90X9X13 Kg 1.03 - - -
Upah Fabrikasi / Ereksi Profil Baja UNP Kg 1.00 - - 3,701.50 3,701.50

MS - UNP 300X100X10X16 Kg 1.00 - 3,701.50


Bahan MS - UNP 300X100X10X16 Kg 1.03 - - -
Upah Fabrikasi / Ereksi Profil Baja UNP Kg 1.00 - - 3,701.50 3,701.50

MS - UNP 320X100X14X17.5 Kg 1.00 - 3,701.50


Bahan MS - UNP 320X100X14X17.5 Kg 1.03 - - -
Upah Fabrikasi / Ereksi Profil Baja UNP Kg 1.00 - - 3,701.50 3,701.50

48(253) Satuan Pekerjaan


515379445.xls

BAHAN UPAH
NO. JENIS PEKERJAAN SATUAN VOLUME
SATUAN TOTAL SATUAN TOTAL
MS - UNP 400X110X14X18 Kg 1.00 - 3,701.50
Bahan MS - UNP 400X110X14X18 Kg 1.03 - - -
Upah Fabrikasi / Ereksi Profil Baja UNP Kg 1.00 - - 3,701.50 3,701.50

MS - WF 100X100X6X8 Kg 1.00 - 3,701.50


Bahan MS - WF 100X100X6X8 Kg 1.05 - - -
Upah Fabrikasi / Ereksi Profil Baja WF Kg 1.00 - - 3,701.50 3,701.50

MS - WF 100X50X5X7 Kg 1.00 - 3,701.50


Bahan MS - WF 100X50X5X7 Kg 1.05 - - -
Upah Fabrikasi / Ereksi Profil Baja WF Kg 1.00 - - 3,701.50 3,701.50

MS - WF 125X125X6.5X9 Kg 1.00 - 3,701.50


Bahan MS - WF 125X125X6.5X9 Kg 1.05 - - -
Upah Fabrikasi / Ereksi Profil Baja WF Kg 1.00 - - 3,701.50 3,701.50

MS - WF 125X60X6X8 Kg 1.00 - 3,701.50


Bahan MS - WF 125X60X6X8 Kg 1.05 - - -
Upah Fabrikasi / Ereksi Profil Baja WF Kg 1.00 - - 3,701.50 3,701.50

MS - WF 148X100X6X9 Kg 1.00 - 3,701.50


Bahan MS - WF 148X100X6X9 Kg 1.05 - - -
Upah Fabrikasi / Ereksi Profil Baja WF Kg 1.00 - - 3,701.50 3,701.50

MS - WF 150X150X7X10 Kg 1.00 - 3,701.50


Bahan MS - WF 150X150X7X10 Kg 1.05 - - -
Upah Fabrikasi / Ereksi Profil Baja WF Kg 1.00 - - 3,701.50 3,701.50

MS - WF 150X75X5X7 Kg 1.00 - 3,701.50


Bahan MS - WF 150X75X5X7 Kg 1.05 - - -
Upah Fabrikasi / Ereksi Profil Baja WF Kg 1.00 - - 3,701.50 3,701.50

MS - WF 175X90X5X8 Kg 1.00 - 3,701.50

49(253) Satuan Pekerjaan


515379445.xls

BAHAN UPAH
NO. JENIS PEKERJAAN SATUAN VOLUME
SATUAN TOTAL SATUAN TOTAL
Bahan MS - WF 175X90X5X8 Kg 1.05 - - -
Upah Fabrikasi / Ereksi Profil Baja WF Kg 1.00 - - 3,701.50 3,701.50

MS - WF 198X99X4.5X7 Kg 1.00 - 3,701.50


Bahan MS - WF 198X99X4.5X7 Kg 1.05 - - -
Upah Fabrikasi / Ereksi Profil Baja WF Kg 1.00 - - 3,701.50 3,701.50

MS - WF 200X100X5.5X8 Kg 1.00 - 3,701.50


Bahan MS - WF 200X100X5.5X8 Kg 1.05 - - -
Upah Fabrikasi / Ereksi Profil Baja WF Kg 1.00 - - 3,701.50 3,701.50

MS - WF 200X200X8X12 Kg 1.00 - 3,701.50


Bahan MS - WF 200X200X8X12 Kg 1.05 - - -
Upah Fabrikasi / Ereksi Profil Baja WF Kg 1.00 - - 3,701.50 3,701.50

MS - WF 248X124X5X8 Kg 1.00 - 3,701.50


Bahan MS - WF 248X124X5X8 Kg 1.05 - - -
Upah Fabrikasi / Ereksi Profil Baja WF Kg 1.00 - - 3,701.50 3,701.50

MS - WF 250X125X6X9 Kg 1.00 - 3,701.50


Bahan MS - WF 250X125X6X9 Kg 1.05 - - -
Upah Fabrikasi / Ereksi Profil Baja WF Kg 1.00 - - 3,701.50 3,701.50

MS - WF 250X250X9X14 Kg 1.00 - 3,701.50


Bahan MS - WF 250X250X9X14 Kg 1.05 - - -
Upah Fabrikasi / Ereksi Profil Baja WF Kg 1.00 - - 3,701.50 3,701.50

MS - WF 298X149X5.5X8 Kg 1.00 - 3,701.50


Bahan MS - WF 298X149X5.5X8 Kg 1.05 - - -
Upah Fabrikasi / Ereksi Profil Baja WF Kg 1.00 - - 3,701.50 3,701.50

MS - WF 300X150X6.5X9 Kg 1.00 - 3,701.50


Bahan MS - WF 300X150X6.5X9 Kg 1.05 - - -

50(253) Satuan Pekerjaan


515379445.xls

BAHAN UPAH
NO. JENIS PEKERJAAN SATUAN VOLUME
SATUAN TOTAL SATUAN TOTAL
Upah Fabrikasi / Ereksi Profil Baja WF Kg 1.00 - - 3,701.50 3,701.50

MS - WF 300X300X10X15 Kg 1.00 - 3,701.50


Bahan MS - WF 300X300X10X15 Kg 1.05 - - -
Upah Fabrikasi / Ereksi Profil Baja WF Kg 1.00 - - 3,701.50 3,701.50

MS - WF 346X174X6X9 Kg 1.00 - 3,701.50


Bahan MS - WF 346X174X6X9 Kg 1.05 - - -
Upah Fabrikasi / Ereksi Profil Baja WF Kg 1.00 - - 3,701.50 3,701.50

MS - WF 350X175X7X11 Kg 1.00 - 3,701.50


Bahan MS - WF 350X175X7X11 Kg 1.05 - - -
Upah Fabrikasi / Ereksi Profil Baja WF Kg 1.00 - - 3,701.50 3,701.50

MS - WF 350X350X12X19 Kg 1.00 - 3,701.50


Bahan MS - WF 350X350X12X19 Kg 1.05 - - -
Upah Fabrikasi / Ereksi Profil Baja WF Kg 1.00 - - 3,701.50 3,701.50

MS - WF 396X199X7X11 Kg 1.00 - 3,701.50


Bahan MS - WF 396X199X7X11 Kg 1.05 - - -
Upah Fabrikasi / Ereksi Profil Baja WF Kg 1.00 - - 3,701.50 3,701.50

MS - WF 400X200X8X13 Kg 1.00 - 3,701.50


Bahan MS - WF 400X200X8X13 Kg 1.05 - - -
Upah Fabrikasi / Ereksi Profil Baja WF Kg 1.00 - - 3,701.50 3,701.50

MS - WF 400X400X13X21 Kg 1.00 - 3,701.50


Bahan MS - WF 400X400X13X21 Kg 1.05 - - -
Upah Fabrikasi / Ereksi Profil Baja WF Kg 1.00 - - 3,701.50 3,701.50

MS - WF 446X199X8X12 Kg 1.00 - 3,701.50


Bahan MS - WF 446X199X8X12 Kg 1.05 - - -
Upah Fabrikasi / Ereksi Profil Baja WF Kg 1.00 - - 3,701.50 3,701.50

51(253) Satuan Pekerjaan


515379445.xls

BAHAN UPAH
NO. JENIS PEKERJAAN SATUAN VOLUME
SATUAN TOTAL SATUAN TOTAL

MS - WF 450X200X9X14 Kg 1.00 - 3,701.50


Bahan MS - WF 450X200X9X14 Kg 1.05 - - -
Upah Fabrikasi / Ereksi Profil Baja WF Kg 1.00 - - 3,701.50 3,701.50

MS - WF 500X200X10X16 Kg 1.00 - 3,701.50


Bahan MS - WF 500X200X10X16 Kg 1.05 - - -
Upah Fabrikasi / Ereksi Profil Baja WF Kg 1.00 - - 3,701.50 3,701.50

MS - WF 600X200X11X17 Kg 1.00 - 3,701.50


Bahan MS - WF 600X200X11X17 Kg 1.05 - - -
Upah Fabrikasi / Ereksi Profil Baja WF Kg 1.00 - - 3,701.50 3,701.50

MS - WF 700X300X13X24 Kg 1.00 - 3,701.50


Bahan MS - WF 700X300X13X24 Kg 1.05 - - -
Upah Fabrikasi / Ereksi Profil Baja WF Kg 1.00 - - 3,701.50 3,701.50

MS - WF 800X300X14X26 Kg 1.00 - 3,701.50


Bahan MS - WF 800X300X14X26 Kg 1.05 - - -
Upah Fabrikasi / Ereksi Profil Baja WF Kg 1.00 - - 3,701.50 3,701.50

RAIL 9 KG/M -1 Kg 1.00 - 27,425.38


Bahan RAIL 9 KG/M Kg 1.05 - - -
Upah Fabrikasi / Ereksi RAIL Kg 1.00 - - 27,425.38 27,425.38

RAIL 12 KG/M-2 Kg 1.00 - 27,425.38


Bahan RAIL 12 KG/M Kg 1.05 - - -
Upah Fabrikasi / Ereksi RAIL Kg 1.00 - - 27,425.38 27,425.38

RAIL 15 KG/M-3 Kg 1.00 - 27,425.38


Bahan RAIL 15 KG/M Kg 1.05 - - -
Upah Fabrikasi / Ereksi RAIL Kg 1.00 - - 27,425.38 27,425.38

52(253) Satuan Pekerjaan


515379445.xls

BAHAN UPAH
NO. JENIS PEKERJAAN SATUAN VOLUME
SATUAN TOTAL SATUAN TOTAL
Pipa Hitam STK 41 - Ø 2-1/2" - 2.8 mm Kg 1.00 - 3,701.50
Bahan Pipa Hitam STK 41 - Ø 2-1/2" - 2.8 mm Kg 1.05 - - -
Upah Fabrikasi / Ereksi Pipa Hitam STK 41 Kg 1.00 - - 3,701.50 3,701.50

Pipa Hitam STK 41 - Ø 2-1/2" - 3.2 mm Kg 1.00 - 3,701.50


Bahan Pipa Hitam STK 41 - Ø 2-1/2" - 3.2 mm Kg 1.05 - - -
Upah Fabrikasi / Ereksi Pipa Hitam STK 41 Kg 1.00 - - 3,701.50 3,701.50

Pipa Hitam STK 41 - Ø 3" - 3.2 mm Kg 1.00 - 3,701.50


Bahan Pipa Hitam STK 41 - Ø 3" - 3.2 mm Kg 1.05 - - -
Upah Fabrikasi / Ereksi Pipa Hitam STK 41 Kg 1.00 - - 3,701.50 3,701.50

Pipa Hitam STK 41 - Ø 4" - 3.5 mm Kg 1.00 - 3,701.50


Bahan Pipa Hitam STK 41 - Ø 4" - 3.5 mm Kg 1.05 - - -
Upah Fabrikasi / Ereksi Pipa Hitam STK 41 Kg 1.00 - - 3,701.50 3,701.50

Pipa Hitam STK 41 - Ø 4" - 4.5 mm Kg 1.00 - 3,701.50


Bahan Pipa Hitam STK 41 - Ø 4" - 4.5 mm Kg 1.05 - - -
Upah Fabrikasi / Ereksi Pipa Hitam STK 41 Kg 1.00 - - 3,701.50 3,701.50

Pipa Hitam STK 41 - Ø 5" - 4.5 mm Kg 1.00 - 3,701.50


Bahan Pipa Hitam STK 41 - Ø 5" - 4.5 mm Kg 1.05 - - -
Upah Fabrikasi / Ereksi Pipa Hitam STK 41 Kg 1.00 - - 3,701.50 3,701.50

Pipa Hitam STK 41 - Ø 5" - 6 mm Kg 1.00 - 3,701.50


Bahan Pipa Hitam STK 41 - Ø 5" - 6 mm Kg 1.05 - - -
Upah Fabrikasi / Ereksi Pipa Hitam STK 41 Kg 1.00 - - 3,701.50 3,701.50

Pipa Hitam STK 41 - Ø 6" - 4.5 mm Kg 1.00 - 3,701.50


Bahan Pipa Hitam STK 41 - Ø 6" - 4.5 mm Kg 1.05 - - -
Upah Fabrikasi / Ereksi Pipa Hitam STK 41 Kg 1.00 - - 3,701.50 3,701.50

Pipa Hitam STK 41 - Ø 6" - 5 mm Kg 1.00 - 3,701.50

53(253) Satuan Pekerjaan


515379445.xls

BAHAN UPAH
NO. JENIS PEKERJAAN SATUAN VOLUME
SATUAN TOTAL SATUAN TOTAL
Bahan Pipa Hitam STK 41 - Ø 6" - 5 mm Kg 1.05 - - -
Upah Fabrikasi / Ereksi Pipa Hitam STK 41 Kg 1.00 - - 3,701.50 3,701.50

Pipa Hitam STK 41 - Ø 6" - 6 mm Kg 1.00 - 3,701.50


Bahan Pipa Hitam STK 41 - Ø 6" - 6 mm Kg 1.05 - - -
Upah Fabrikasi / Ereksi Pipa Hitam STK 41 Kg 1.00 - - 3,701.50 3,701.50

Pipa Hitam STK 41 - Ø 7" - 5.3 mm Kg 1.00 - 3,701.50


Bahan Pipa Hitam STK 41 - Ø 7" - 5.3 mm Kg 1.05 - - -
Upah Fabrikasi / Ereksi Pipa Hitam STK 41 Kg 1.00 - - 3,701.50 3,701.50

Pipa Hitam STK 41 - Ø 8" - 5.8 mm Kg 1.00 - 3,701.50


Bahan Pipa Hitam STK 41 - Ø 8" - 5.8 mm Kg 1.05 - - -
Upah Fabrikasi / Ereksi Pipa Hitam STK 41 Kg 1.00 - - 3,701.50 3,701.50

Pipa Hitam STK 41 - Ø 8" - 8.2 mm Kg 1.00 - 3,701.50


Bahan Pipa Hitam STK 41 - Ø 8" - 8.2 mm Kg 1.05 - - -
Upah Fabrikasi / Ereksi Pipa Hitam STK 41 Kg 1.00 - - 3,701.50 3,701.50

Pipa Hitam STK 41 - Ø 10" - 6.6 mm Kg 1.00 - 3,701.50


Bahan Pipa Hitam STK 41 - Ø 10" - 6.6 mm Kg 1.05 - - -
Upah Fabrikasi / Ereksi Pipa Hitam STK 41 Kg 1.00 - - 3,701.50 3,701.50

Pipa Hitam STK 41 - Ø 12" - 6.9 mm Kg 1.00 - 3,701.50


Bahan Pipa Hitam STK 41 - Ø 12" - 6.9 mm Kg 1.05 - - -
Upah Fabrikasi / Ereksi Pipa Hitam STK 41 Kg 1.00 - - 3,701.50 3,701.50

Pipa Hitam STK 41 - Ø 14" - 7.9 mm Kg 1.00 - 3,701.50


Bahan Pipa Hitam STK 41 - Ø 14" - 7.9 mm Kg 1.05 - - -
Upah Fabrikasi / Ereksi Pipa Hitam STK 41 Kg 1.00 - - 3,701.50 3,701.50

Pipa Galvanized - Ø 1-1/4" Kg 1.00 - 3,701.50


Bahan Pipa Galvanized - Ø 1-1/4" Kg 1.05 - - -

54(253) Satuan Pekerjaan


515379445.xls

BAHAN UPAH
NO. JENIS PEKERJAAN SATUAN VOLUME
SATUAN TOTAL SATUAN TOTAL
Upah Fabrikasi / Ereksi Pipa Hitam Medium Kg 1.00 - - 3,701.50 3,701.50

Pipa Hitam Medium - Ø 1/2" Kg 1.00 - 3,701.50


Bahan Pipa Hitam Medium - Ø 1/2" Kg 1.05 - - -
Upah Fabrikasi / Ereksi Pipa Hitam Medium Kg 1.00 - - 3,701.50 3,701.50

Pipa Hitam Medium - Ø 3/4" Kg 1.00 - 3,701.50


Bahan Pipa Hitam Medium - Ø 3/4" Kg 1.05 - - -
Upah Fabrikasi / Ereksi Pipa Hitam Medium Kg 1.00 - - 3,701.50 3,701.50

Pipa Hitam Medium - Ø 1" Kg 1.00 - 3,701.50


Bahan Pipa Hitam Medium - Ø 1" Kg 1.05 - - -
Upah Fabrikasi / Ereksi Pipa Hitam Medium Kg 1.00 - - 3,701.50 3,701.50

Pipa Hitam Medium - Ø 1-1/4" Kg 1.00 - 3,701.50


Bahan Pipa Hitam Medium - Ø 1-1/4" Kg 1.05 - - -
Upah Fabrikasi / Ereksi Pipa Hitam Medium Kg 1.00 - - 3,701.50 3,701.50

Pipa Hitam Medium - Ø 1-1/2" Kg 1.00 - 3,701.50


Bahan Pipa Hitam Medium - Ø 1-1/2" Kg 1.05 - - -
Upah Fabrikasi / Ereksi Pipa Hitam Medium Kg 1.00 - - 3,701.50 3,701.50

Pipa Hitam Medium - Ø 2" Kg 1.00 - 3,701.50


Bahan Pipa Hitam Medium - Ø 2" Kg 1.05 - - -
Upah Fabrikasi / Ereksi Pipa Hitam Medium Kg 1.00 - - 3,701.50 3,701.50

Pipa Hitam Medium - Ø 2-1/2" Kg 1.00 - 3,701.50


Bahan Pipa Hitam Medium - Ø 2-1/2" Kg 1.05 - - -
Upah Fabrikasi / Ereksi Pipa Hitam Medium Kg 1.00 - - 3,701.50 3,701.50

Pipa Hitam Medium - Ø 3" Kg 1.00 - 3,701.50


Bahan Pipa Hitam Medium - Ø 3" Kg 1.05 - - -
Upah Fabrikasi / Ereksi Pipa Hitam Medium Kg 1.00 - - 3,701.50 3,701.50

55(253) Satuan Pekerjaan


515379445.xls

BAHAN UPAH
NO. JENIS PEKERJAAN SATUAN VOLUME
SATUAN TOTAL SATUAN TOTAL

Pipa Hitam Medium - Ø 4" Kg 1.00 - 3,701.50


Bahan Pipa Hitam Medium - Ø 4" Kg 1.05 - - -
Upah Fabrikasi / Ereksi Pipa Hitam Medium Kg 1.00 - - 3,701.50 3,701.50

Pipa Hitam Medium - Ø 5" Kg 1.00 - 3,701.50


Bahan Pipa Hitam Medium - Ø 5" Kg 1.05 - - -
Upah Fabrikasi / Ereksi Pipa Hitam Medium Kg 1.00 - - 3,701.50 3,701.50

Pipa Hitam Medium - Ø 6" Kg 1.00 - 3,701.50


Bahan Pipa Hitam Medium - Ø 6" Kg 1.05 - - -
Upah Fabrikasi / Ereksi Pipa Hitam Medium Kg 1.00 - - 3,701.50 3,701.50

Galvanized Welded Mesh 4"x4" M² 1.00 - 18,913.75


Bahan Galvanized Welded Mesh 4"x4" M² 1.10 - - -
Upah Pasang Galvanized Welded Mesh M² 1.00 - - 18,913.75 18,913.75

Kawat Duri/Barbed Wire M' 1.00 - 1,891.96


Bahan Kawat Duri/Barbed Wire M' 1.03 - - -
Upah Pasang Kawat Duri M' 1.00 - - 1,891.96 1,891.96

Kawat Harmonika 5 x 5 cm Galvanized 3 mm M² 1.00 - 6,619.67


Bahan Kawat Harmonika 5 x 5 cm Galvanized 3 mm M² 1.02 - - - -
Upah Pasang Kawat Harmonika M² 1.00 - - 6,619.67 6,619.67

PEKERJAAN BAUT

BOLT & NUT HTB A325 - Ø 1/2" X 1-1/4" Bh 1.00 - 500.00


Bahan BOLT & NUT HTB A325 - Ø 1/2" X 1-1/4" Bh 1.00 - - -
Upah Pasang Baut HTB Bh 1.00 - - 500.00 500.00

BOLT & NUT HTB A325 - Ø 1/2" X 1" Bh 1.00 - 500.00


Bahan BOLT & NUT HTB A325 - Ø 1/2" X 1" Bh 1.00 - - -

56(253) Satuan Pekerjaan


515379445.xls

BAHAN UPAH
NO. JENIS PEKERJAAN SATUAN VOLUME
SATUAN TOTAL SATUAN TOTAL
Upah Pasang Baut HTB Bh 1.00 - - 500.00 500.00

BOLT & NUT HTB A325 - Ø 1/2" X 1-1/2" Bh 1.00 - 500.00


Bahan BOLT & NUT HTB A325 - Ø 1/2" X 1-1/2" Bh 1.00 - - -
Upah Pasang Baut HTB Bh 1.00 - - 500.00 500.00

BOLT & NUT HTB A325 - Ø 1/2" X 1-3/4" Bh 1.00 - 500.00


Bahan BOLT & NUT HTB A325 - Ø 1/2" X 1-3/4" Bh 1.00 - - -
Upah Pasang Baut HTB Bh 1.00 - - 500.00 500.00

BOLT & NUT HTB A325 - Ø 1/2" X 2" Bh 1.00 - 500.00


Bahan BOLT & NUT HTB A325 - Ø 1/2" X 2" Bh 1.00 - - -
Upah Pasang Baut HTB Bh 1.00 - - 500.00 500.00

BOLT & NUT HTB A325 - Ø 1/2" X 2-1/4" Bh 1.00 - 500.00


Bahan BOLT & NUT HTB A325 - Ø 1/2" X 2-1/4" Bh 1.00 - - -
Upah Pasang Baut HTB Bh 1.00 - - 500.00 500.00

BOLT & NUT HTB A325 - Ø 1/2" X 2-1/2" Bh 1.00 - 500.00


Bahan BOLT & NUT HTB A325 - Ø 1/2" X 2-1/2" Bh 1.00 - - -
Upah Pasang Baut HTB Bh 1.00 - - 500.00 500.00

BOLT & NUT HTB A325 - Ø 1/2" X 2-3/4" Bh 1.00 - 500.00


Bahan BOLT & NUT HTB A325 - Ø 1/2" X 2-3/4" Bh 1.00 - - -
Upah Pasang Baut HTB Bh 1.00 - - 500.00 500.00

BOLT & NUT HTB A325 - Ø 1/2" X 3" Bh 1.00 - 500.00


Bahan BOLT & NUT HTB A325 - Ø 1/2" X 3" Bh 1.00 - - -
Upah Pasang Baut HTB Bh 1.00 - - 500.00 500.00

BOLT & NUT HTB A325 - Ø 1/2" X 3-1/2" Bh 1.00 - 500.00


Bahan BOLT & NUT HTB A325 - Ø 1/2" X 3-1/2" Bh 1.00 - - -
Upah Pasang Baut HTB Bh 1.00 - - 500.00 500.00

57(253) Satuan Pekerjaan


515379445.xls

BAHAN UPAH
NO. JENIS PEKERJAAN SATUAN VOLUME
SATUAN TOTAL SATUAN TOTAL

BOLT & NUT HTB A325 - Ø 1/2" X 4" Bh 1.00 - 500.00


Bahan BOLT & NUT HTB A325 - Ø 1/2" X 4" Bh 1.00 - - -
Upah Pasang Baut HTB Bh 1.00 - - 500.00 500.00

BOLT & NUT HTB A325 - Ø 1/2" X 4-1/2" Bh 1.00 - 500.00


Bahan BOLT & NUT HTB A325 - Ø 1/2" X 4-1/2" Bh 1.00 - - -
Upah Pasang Baut HTB Bh 1.00 - - 500.00 500.00

BOLT & NUT HTB A325 - Ø 1/2" X 5" Bh 1.00 - 500.00


Bahan BOLT & NUT HTB A325 - Ø 1/2" X 5" Bh 1.00 - - -
Upah Pasang Baut HTB Bh 1.00 - - 500.00 500.00

BOLT & NUT HTB A325 - Ø 1/2" X 5-1/2" Bh 1.00 - 500.00


Bahan BOLT & NUT HTB A325 - Ø 1/2" X 5-1/2" Bh 1.00 - - -
Upah Pasang Baut HTB Bh 1.00 - - 500.00 500.00

BOLT & NUT HTB A325 - Ø 1/2" X 6" Bh 1.00 - 500.00


Bahan BOLT & NUT HTB A325 - Ø 1/2" X 6" Bh 1.00 - - -
Upah Pasang Baut HTB Bh 1.00 - - 500.00 500.00

BOLT & NUT HTB A325 - Ø 5/8" X 1-1/2" Bh 1.00 - 500.00


Bahan BOLT & NUT HTB A325 - Ø 5/8" X 1-1/2" Bh 1.00 - - -
Upah Pasang Baut HTB Bh 1.00 - - 500.00 500.00

BOLT & NUT HTB A325 - Ø 5/8" X 1-3/4" Bh 1.00 - 500.00


Bahan BOLT & NUT HTB A325 - Ø 5/8" X 1-3/4" Bh 1.00 - - -
Upah Pasang Baut HTB Bh 1.00 - - 500.00 500.00

BOLT & NUT HTB A325 - Ø 5/8" X 2" Bh 1.00 - 500.00


Bahan BOLT & NUT HTB A325 - Ø 5/8" X 2" Bh 1.00 - - -
Upah Pasang Baut HTB Bh 1.00 - - 500.00 500.00

58(253) Satuan Pekerjaan


515379445.xls

BAHAN UPAH
NO. JENIS PEKERJAAN SATUAN VOLUME
SATUAN TOTAL SATUAN TOTAL
BOLT & NUT HTB A325 - Ø 5/8" X 2-1/4" Bh 1.00 - 500.00
Bahan BOLT & NUT HTB A325 - Ø 5/8" X 2-1/4" Bh 1.00 - - -
Upah Pasang Baut HTB Bh 1.00 - - 500.00 500.00

BOLT & NUT HTB A325 - Ø 5/8" X 2-1/2" Bh 1.00 - 500.00


Bahan BOLT & NUT HTB A325 - Ø 5/8" X 2-1/2" Bh 1.00 - - -
Upah Pasang Baut HTB Bh 1.00 - - 500.00 500.00

BOLT & NUT HTB A325 - Ø 5/8" X 2-3/4" Bh 1.00 - 500.00


Bahan BOLT & NUT HTB A325 - Ø 5/8" X 2-3/4" Bh 1.00 - - -
Upah Pasang Baut HTB Bh 1.00 - - 500.00 500.00

BOLT & NUT HTB A325 - Ø 5/8" X 3" Bh 1.00 - 500.00


Bahan BOLT & NUT HTB A325 - Ø 5/8" X 3" Bh 1.00 - - -
Upah Pasang Baut HTB Bh 1.00 - - 500.00 500.00

BOLT & NUT HTB A325 - Ø 5/8" X 3-1/2" Bh 1.00 - 500.00


Bahan BOLT & NUT HTB A325 - Ø 5/8" X 3-1/2" Bh 1.00 - - -
Upah Pasang Baut HTB Bh 1.00 - - 500.00 500.00

BOLT & NUT HTB A325 - Ø 5/8" X 4" Bh 1.00 - 500.00


Bahan BOLT & NUT HTB A325 - Ø 5/8" X 4" Bh 1.00 - - -
Upah Pasang Baut HTB Bh 1.00 - - 500.00 500.00

BOLT & NUT HTB A325 - Ø 5/8" X 4-1/2" Bh 1.00 - 500.00


Bahan BOLT & NUT HTB A325 - Ø 5/8" X 4-1/2" Bh 1.00 - - -
Upah Pasang Baut HTB Bh 1.00 - - 500.00 500.00

BOLT & NUT HTB A325 - Ø 5/8" X 5" Bh 1.00 - 500.00


Bahan BOLT & NUT HTB A325 - Ø 5/8" X 5" Bh 1.00 - - -
Upah Pasang Baut HTB Bh 1.00 - - 500.00 500.00

BOLT & NUT HTB A325 - Ø 5/8" X 5-1/2" Bh 1.00 - 500.00

59(253) Satuan Pekerjaan


515379445.xls

BAHAN UPAH
NO. JENIS PEKERJAAN SATUAN VOLUME
SATUAN TOTAL SATUAN TOTAL
Bahan BOLT & NUT HTB A325 - Ø 5/8" X 5-1/2" Bh 1.00 - - -
Upah Pasang Baut HTB Bh 1.00 - - 500.00 500.00

BOLT & NUT HTB A325 - Ø 5/8" X 6" Bh 1.00 - 500.00


Bahan BOLT & NUT HTB A325 - Ø 5/8" X 6" Bh 1.00 - - -
Upah Pasang Baut HTB Bh 1.00 - - 500.00 500.00

BOLT & NUT HTB A325 - Ø 3/4" X 1-1/2" Bh 1.00 - 500.00


Bahan BOLT & NUT HTB A325 - Ø 3/4" X 1-1/2" Bh 1.00 - - -
Upah Pasang Baut HTB Bh 1.00 - - 500.00 500.00

BOLT & NUT HTB A325 - Ø 3/4" X 1-3/4" Bh 1.00 - 500.00


Bahan BOLT & NUT HTB A325 - Ø 3/4" X 1-3/4" Bh 1.00 - - -
Upah Pasang Baut HTB Bh 1.00 - - 500.00 500.00

BOLT & NUT HTB A325 - Ø 3/4" X 2" Bh 1.00 - 500.00


Bahan BOLT & NUT HTB A325 - Ø 3/4" X 2" Bh 1.00 - - -
Upah Pasang Baut HTB Bh 1.00 - - 500.00 500.00

BOLT & NUT HTB A325 - Ø 3/4" X 2-1/4" Bh 1.00 - 500.00


Bahan BOLT & NUT HTB A325 - Ø 3/4" X 2-1/4" Bh 1.00 - - -
Upah Pasang Baut HTB Bh 1.00 - - 500.00 500.00

BOLT & NUT HTB A325 - Ø 3/4" X 2-1/2" Bh 1.00 - 500.00


Bahan BOLT & NUT HTB A325 - Ø 3/4" X 2-1/2" Bh 1.00 - - -
Upah Pasang Baut HTB Bh 1.00 - - 500.00 500.00

BOLT & NUT HTB A325 - Ø 3/4" X 2-3/4" Bh 1.00 - 500.00


Bahan BOLT & NUT HTB A325 - Ø 3/4" X 2-3/4" Bh 1.00 - - -
Upah Pasang Baut HTB Bh 1.00 - - 500.00 500.00

BOLT & NUT HTB A325 - Ø 3/4" X 3" Bh 1.00 - 500.00


Bahan BOLT & NUT HTB A325 - Ø 3/4" X 3" Bh 1.00 - - -

60(253) Satuan Pekerjaan


515379445.xls

BAHAN UPAH
NO. JENIS PEKERJAAN SATUAN VOLUME
SATUAN TOTAL SATUAN TOTAL
Upah Pasang Baut HTB Bh 1.00 - - 500.00 500.00

BOLT & NUT HTB A325 - Ø 3/4" X 3-1/2" Bh 1.00 - 500.00


Bahan BOLT & NUT HTB A325 - Ø 3/4" X 3-1/2" Bh 1.00 - - -
Upah Pasang Baut HTB Bh 1.00 - - 500.00 500.00

BOLT & NUT HTB A325 - Ø 3/4" X 4" Bh 1.00 - 500.00


Bahan BOLT & NUT HTB A325 - Ø 3/4" X 4" Bh 1.00 - - -
Upah Pasang Baut HTB Bh 1.00 - - 500.00 500.00

BOLT & NUT HTB A325 - Ø 3/4" X 4-1/2" Bh 1.00 - 500.00


Bahan BOLT & NUT HTB A325 - Ø 3/4" X 4-1/2" Bh 1.00 - - -
Upah Pasang Baut HTB Bh 1.00 - - 500.00 500.00

BOLT & NUT HTB A325 - Ø 3/4" X 5" Bh 1.00 - 500.00


Bahan BOLT & NUT HTB A325 - Ø 3/4" X 5" Bh 1.00 - - -
Upah Pasang Baut HTB Bh 1.00 - - 500.00 500.00

BOLT & NUT HTB A325 - Ø 3/4" X 5-1/2" Bh 1.00 - 500.00


Bahan BOLT & NUT HTB A325 - Ø 3/4" X 5-1/2" Bh 1.00 - - -
Upah Pasang Baut HTB Bh 1.00 - - 500.00 500.00

BOLT & NUT HTB A325 - Ø 3/4" X 6" Bh 1.00 - 500.00


Bahan BOLT & NUT HTB A325 - Ø 3/4" X 6" Bh 1.00 - - -
Upah Pasang Baut HTB Bh 1.00 - - 500.00 500.00

BOLT & NUT HTB A325 - Ø 7/8" X 1-1/2" Bh 1.00 - 500.00


Bahan BOLT & NUT HTB A325 - Ø 7/8" X 1-1/2" Bh 1.00 - - -
Upah Pasang Baut HTB Bh 1.00 - - 500.00 500.00

BOLT & NUT HTB A325 - Ø 7/8" X 1-3/4" Bh 1.00 - 500.00


Bahan BOLT & NUT HTB A325 - Ø 7/8" X 1-3/4" Bh 1.00 - - -
Upah Pasang Baut HTB Bh 1.00 - - 500.00 500.00

61(253) Satuan Pekerjaan


515379445.xls

BAHAN UPAH
NO. JENIS PEKERJAAN SATUAN VOLUME
SATUAN TOTAL SATUAN TOTAL

BOLT & NUT HTB A325 - Ø 7/8" X 2" Bh 1.00 - 500.00


Bahan BOLT & NUT HTB A325 - Ø 7/8" X 2" Bh 1.00 - - -
Upah Pasang Baut HTB Bh 1.00 - - 500.00 500.00

BOLT & NUT HTB A325 - Ø 7/8" X 2-1/4" Bh 1.00 - 500.00


Bahan BOLT & NUT HTB A325 - Ø 7/8" X 2-1/4" Bh 1.00 - - -
Upah Pasang Baut HTB Bh 1.00 - - 500.00 500.00

BOLT & NUT HTB A325 - Ø 7/8" X 2-1/2" Bh 1.00 - 500.00


Bahan BOLT & NUT HTB A325 - Ø 7/8" X 2-1/2" Bh 1.00 - - -
Upah Pasang Baut HTB Bh 1.00 - - 500.00 500.00

BOLT & NUT HTB A325 - Ø 7/8" X 2-3/4" Bh 1.00 - 500.00


Bahan BOLT & NUT HTB A325 - Ø 7/8" X 2-3/4" Bh 1.00 - - -
Upah Pasang Baut HTB Bh 1.00 - - 500.00 500.00

BOLT & NUT HTB A325 - Ø 7/8" X 3" Bh 1.00 - 500.00


Bahan BOLT & NUT HTB A325 - Ø 7/8" X 3" Bh 1.00 - - -
Upah Pasang Baut HTB Bh 1.00 - - 500.00 500.00

BOLT & NUT HTB A325 - Ø 7/8" X 3-1/4" Bh 1.00 - 500.00


Bahan BOLT & NUT HTB A325 - Ø 7/8" X 3-1/4" Bh 1.00 - - -
Upah Pasang Baut HTB Bh 1.00 - - 500.00 500.00

BOLT & NUT HTB A325 - Ø 7/8" X 3-1/2" Bh 1.00 - 500.00


Bahan BOLT & NUT HTB A325 - Ø 7/8" X 3-1/2" Bh 1.00 - - -
Upah Pasang Baut HTB Bh 1.00 - - 500.00 500.00

BOLT & NUT HTB A325 - Ø 7/8" X 3-3/4" Bh 1.00 - 500.00


Bahan BOLT & NUT HTB A325 - Ø 7/8" X 3-3/4" Bh 1.00 - - -
Upah Pasang Baut HTB Bh 1.00 - - 500.00 500.00

62(253) Satuan Pekerjaan


515379445.xls

BAHAN UPAH
NO. JENIS PEKERJAAN SATUAN VOLUME
SATUAN TOTAL SATUAN TOTAL
BOLT & NUT HTB A325 - Ø 7/8" X 4" Bh 1.00 - 500.00
Bahan BOLT & NUT HTB A325 - Ø 7/8" X 4" Bh 1.00 - - -
Upah Pasang Baut HTB Bh 1.00 - - 500.00 500.00

BOLT & NUT HTB A325 - Ø 7/8" X 4-1/2" Bh 1.00 - 500.00


Bahan BOLT & NUT HTB A325 - Ø 7/8" X 4-1/2" Bh 1.00 - - -
Upah Pasang Baut HTB Bh 1.00 - - 500.00 500.00

BOLT & NUT HTB A325 - Ø 7/8" X 5" Bh 1.00 - 500.00


Bahan BOLT & NUT HTB A325 - Ø 7/8" X 5" Bh 1.00 - - -
Upah Pasang Baut HTB Bh 1.00 - - 500.00 500.00

BOLT & NUT HTB A325 - Ø 7/8" X 5-1/2" Bh 1.00 - 500.00


Bahan BOLT & NUT HTB A325 - Ø 7/8" X 5-1/2" Bh 1.00 - - -
Upah Pasang Baut HTB Bh 1.00 - - 500.00 500.00

BOLT & NUT HTB A325 - Ø 7/8" X 6" Bh 1.00 - 500.00


Bahan BOLT & NUT HTB A325 - Ø 7/8" X 6" Bh 1.00 - - -
Upah Pasang Baut HTB Bh 1.00 - - 500.00 500.00

BOLT & NUT HTB A325 - Ø 1" X 1-1/2" Bh 1.00 - 500.00


Bahan BOLT & NUT HTB A325 - Ø 1" X 1-1/2" Bh 1.00 - - -
Upah Pasang Baut HTB Bh 1.00 - - 500.00 500.00

BOLT & NUT HTB A325 - Ø 1" X 1-3/4" Bh 1.00 - 500.00


Bahan BOLT & NUT HTB A325 - Ø 1" X 1-3/4" Bh 1.00 - - -
Upah Pasang Baut HTB Bh 1.00 - - 500.00 500.00

BOLT & NUT HTB A325 - Ø 1" X 2" Bh 1.00 - 500.00


Bahan BOLT & NUT HTB A325 - Ø 1" X 2" Bh 1.00 - - -
Upah Pasang Baut HTB Bh 1.00 - - 500.00 500.00

BOLT & NUT HTB A325 - Ø 1" X 2-1/4" Bh 1.00 - 500.00

63(253) Satuan Pekerjaan


515379445.xls

BAHAN UPAH
NO. JENIS PEKERJAAN SATUAN VOLUME
SATUAN TOTAL SATUAN TOTAL
Bahan BOLT & NUT HTB A325 - Ø 1" X 2-1/4" Bh 1.00 - - -
Upah Pasang Baut HTB Bh 1.00 - - 500.00 500.00

BOLT & NUT HTB A325 - Ø 1" X 2-1/2" Bh 1.00 - 500.00


Bahan BOLT & NUT HTB A325 - Ø 1" X 2-1/2" Bh 1.00 - - -
Upah Pasang Baut HTB Bh 1.00 - - 500.00 500.00

BOLT & NUT HTB A325 - Ø 1" X 2-3/4" Bh 1.00 - 500.00


Bahan BOLT & NUT HTB A325 - Ø 1" X 2-3/4" Bh 1.00 - - -
Upah Pasang Baut HTB Bh 1.00 - - 500.00 500.00

BOLT & NUT HTB A325 - Ø 1" X 3" Bh 1.00 - 500.00


Bahan BOLT & NUT HTB A325 - Ø 1" X 3" Bh 1.00 - - -
Upah Pasang Baut HTB Bh 1.00 - - 500.00 500.00

BOLT & NUT HTB A325 - Ø 1" X 3-1/2" Bh 1.00 - 500.00


Bahan BOLT & NUT HTB A325 - Ø 1" X 3-1/2" Bh 1.00 - - -
Upah Pasang Baut HTB Bh 1.00 - - 500.00 500.00

BOLT & NUT HTB A325 - Ø 1" X 4" Bh 1.00 - 500.00


Bahan BOLT & NUT HTB A325 - Ø 1" X 4" Bh 1.00 - - -
Upah Pasang Baut HTB Bh 1.00 - - 500.00 500.00

BOLT & NUT HTB A325 - Ø 1" X 4-1/2" Bh 1.00 - 500.00


Bahan BOLT & NUT HTB A325 - Ø 1" X 4-1/2" Bh 1.00 - - -
Upah Pasang Baut HTB Bh 1.00 - - 500.00 500.00

BOLT & NUT HTB A325 - Ø 1" X 5" Bh 1.00 - 500.00


Bahan BOLT & NUT HTB A325 - Ø 1" X 5" Bh 1.00 - - -
Upah Pasang Baut HTB Bh 1.00 - - 500.00 500.00

BOLT & NUT HTB A325 - Ø 1" X 5-1/2" Bh 1.00 - 500.00


Bahan BOLT & NUT HTB A325 - Ø 1" X 5-1/2" Bh 1.00 - - -

64(253) Satuan Pekerjaan


515379445.xls

BAHAN UPAH
NO. JENIS PEKERJAAN SATUAN VOLUME
SATUAN TOTAL SATUAN TOTAL
Upah Pasang Baut HTB Bh 1.00 - - 500.00 500.00

BOLT & NUT HTB A325 - Ø 1" X 6" Bh 1.00 - 500.00


Bahan BOLT & NUT HTB A325 - Ø 1" X 6" Bh 1.00 - - -
Upah Pasang Baut HTB Bh 1.00 - - 500.00 500.00

BOLT & NUT HTB A325 - Ø 1-1/4" X 1-1/2" Bh 1.00 - 500.00


Bahan BOLT & NUT HTB A325 - Ø 1-1/4" X 1-1/2" Bh 1.00 - - -
Upah Pasang Baut HTB Bh 1.00 - - 500.00 500.00

BOLT & NUT HTB A325 - Ø 1-1/4" X 1-3/4" Bh 1.00 - 500.00


Bahan BOLT & NUT HTB A325 - Ø 1-1/4" X 1-3/4" Bh 1.00 - - -
Upah Pasang Baut HTB Bh 1.00 - - 500.00 500.00

BOLT & NUT HTB A325 - Ø 1-1/4" X 2" Bh 1.00 - 500.00


Bahan BOLT & NUT HTB A325 - Ø 1-1/4" X 2" Bh 1.00 - - -
Upah Pasang Baut HTB Bh 1.00 - - 500.00 500.00

BOLT & NUT HTB A325 - Ø 1-1/4" X 2-1/4" Bh 1.00 - 500.00


Bahan BOLT & NUT HTB A325 - Ø 1-1/4" X 2-1/4" Bh 1.00 - - -
Upah Pasang Baut HTB Bh 1.00 - - 500.00 500.00

BOLT & NUT HTB A325 - Ø 1-1/4" X 2-1/2" Bh 1.00 - 500.00


Bahan BOLT & NUT HTB A325 - Ø 1-1/4" X 2-1/2" Bh 1.00 - - -
Upah Pasang Baut HTB Bh 1.00 - - 500.00 500.00

BOLT & NUT HTB A325 - Ø 1-1/4" X 2-3/4" Bh 1.00 - 500.00


Bahan BOLT & NUT HTB A325 - Ø 1-1/4" X 2-3/4" Bh 1.00 - - -
Upah Pasang Baut HTB Bh 1.00 - - 500.00 500.00

BOLT & NUT HTB A325 - Ø 1-1/4" X 3" Bh 1.00 - 500.00


Bahan BOLT & NUT HTB A325 - Ø 1-1/4" X 3" Bh 1.00 - - -
Upah Pasang Baut HTB Bh 1.00 - - 500.00 500.00

65(253) Satuan Pekerjaan


515379445.xls

BAHAN UPAH
NO. JENIS PEKERJAAN SATUAN VOLUME
SATUAN TOTAL SATUAN TOTAL

BOLT & NUT HTB A325 - Ø 1-1/4" X 3-1/2" Bh 1.00 - 500.00


Bahan BOLT & NUT HTB A325 - Ø 1-1/4" X 3-1/2" Bh 1.00 - - -
Upah Pasang Baut HTB Bh 1.00 - - 500.00 500.00

BOLT & NUT HTB A325 - Ø 1-1/4" X 4" Bh 1.00 - 500.00


Bahan BOLT & NUT HTB A325 - Ø 1-1/4" X 4" Bh 1.00 - - -
Upah Pasang Baut HTB Bh 1.00 - - 500.00 500.00

BOLT & NUT HTB A325 - Ø 1-1/4" X 4-1/2" Bh 1.00 - 500.00


Bahan BOLT & NUT HTB A325 - Ø 1-1/4" X 4-1/2" Bh 1.00 - - -
Upah Pasang Baut HTB Bh 1.00 - - 500.00 500.00

BOLT & NUT HTB A325 - Ø 1-1/4" X 5" Bh 1.00 - 500.00


Bahan BOLT & NUT HTB A325 - Ø 1-1/4" X 5" Bh 1.00 - - -
Upah Pasang Baut HTB Bh 1.00 - - 500.00 500.00

BOLT & NUT HTB A325 - Ø 1-1/4" X 5-1/2" Bh 1.00 - 500.00


Bahan BOLT & NUT HTB A325 - Ø 1-1/4" X 5-1/2" Bh 1.00 - - -
Upah Pasang Baut HTB Bh 1.00 - - 500.00 500.00

BOLT & NUT HTB A325 - Ø 1-1/4" X 6" Bh 1.00 - 500.00


Bahan BOLT & NUT HTB A325 - Ø 1-1/4" X 6" Bh 1.00 - - -
Upah Pasang Baut HTB Bh 1.00 - - 500.00 500.00

BOLT & NUT HTB A325 - Ø 1-1/2" X 1-1/2" Bh 1.00 - 500.00


Bahan BOLT & NUT HTB A325 - Ø 1-1/2" X 1-1/2" Bh 1.00 - - -
Upah Pasang Baut HTB Bh 1.00 - - 500.00 500.00

BOLT & NUT HTB A325 - Ø 1-1/2" X 1-3/4" Bh 1.00 - 500.00


Bahan BOLT & NUT HTB A325 - Ø 1-1/2" X 1-3/4" Bh 1.00 - - -
Upah Pasang Baut HTB Bh 1.00 - - 500.00 500.00

66(253) Satuan Pekerjaan


515379445.xls

BAHAN UPAH
NO. JENIS PEKERJAAN SATUAN VOLUME
SATUAN TOTAL SATUAN TOTAL
BOLT & NUT HTB A325 - Ø 1-1/2" X 2" Bh 1.00 - 500.00
Bahan BOLT & NUT HTB A325 - Ø 1-1/2" X 2" Bh 1.00 - - -
Upah Pasang Baut HTB Bh 1.00 - - 500.00 500.00

BOLT & NUT HTB A325 - Ø 1-1/2" X 2-1/4" Bh 1.00 - 500.00


Bahan BOLT & NUT HTB A325 - Ø 1-1/2" X 2-1/4" Bh 1.00 - - -
Upah Pasang Baut HTB Bh 1.00 - - 500.00 500.00

BOLT & NUT HTB A325 - Ø 1-1/2" X 2-1/2" Bh 1.00 - 500.00


Bahan BOLT & NUT HTB A325 - Ø 1-1/2" X 2-1/2" Bh 1.00 - - -
Upah Pasang Baut HTB Bh 1.00 - - 500.00 500.00

BOLT & NUT HTB A325 - Ø 1-1/2" X 2-3/4" Bh 1.00 - 500.00


Bahan BOLT & NUT HTB A325 - Ø 1-1/2" X 2-3/4" Bh 1.00 - - -
Upah Pasang Baut HTB Bh 1.00 - - 500.00 500.00

BOLT & NUT HTB A325 - Ø 1-1/2" X 3" Bh 1.00 - 500.00


Bahan BOLT & NUT HTB A325 - Ø 1-1/2" X 3" Bh 1.00 - - -
Upah Pasang Baut HTB Bh 1.00 - - 500.00 500.00

BOLT & NUT HTB A325 - Ø 1-1/2" X 3-1/2" Bh 1.00 - 500.00


Bahan BOLT & NUT HTB A325 - Ø 1-1/2" X 3-1/2" Bh 1.00 - - -
Upah Pasang Baut HTB Bh 1.00 - - 500.00 500.00

BOLT & NUT HTB A325 - Ø 1-1/2" X 4" Bh 1.00 - 500.00


Bahan BOLT & NUT HTB A325 - Ø 1-1/2" X 4" Bh 1.00 - - -
Upah Pasang Baut HTB Bh 1.00 - - 500.00 500.00

BOLT & NUT HTB A325 - Ø 1-1/2" X 4-1/2" Bh 1.00 - 500.00


Bahan BOLT & NUT HTB A325 - Ø 1-1/2" X 4-1/2" Bh 1.00 - - -
Upah Pasang Baut HTB Bh 1.00 - - 500.00 500.00

BOLT & NUT HTB A325 - Ø 1-1/2" X 5" Bh 1.00 - 500.00

67(253) Satuan Pekerjaan


515379445.xls

BAHAN UPAH
NO. JENIS PEKERJAAN SATUAN VOLUME
SATUAN TOTAL SATUAN TOTAL
Bahan BOLT & NUT HTB A325 - Ø 1-1/2" X 5" Bh 1.00 - - -
Upah Pasang Baut HTB Bh 1.00 - - 500.00 500.00

BOLT & NUT HTB A325 - Ø 1-1/2" X 5-1/2" Bh 1.00 - 500.00


Bahan BOLT & NUT HTB A325 - Ø 1-1/2" X 5-1/2" Bh 1.00 - - -
Upah Pasang Baut HTB Bh 1.00 - - 500.00 500.00

BOLT & NUT HTB A325 - Ø 1-1/2" X 6" Bh 1.00 - 500.00


Bahan BOLT & NUT HTB A325 - Ø 1-1/2" X 6" Bh 1.00 - - -
Upah Pasang Baut HTB Bh 1.00 - - 500.00 500.00

BOLT & NUT M 6 X 12 Bh 1.00 - 500.00


Bahan BOLT & NUT M 6 X 12 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 6 X 16 Bh 1.00 - 500.00


Bahan BOLT & NUT M 6 X 16 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 6 X 20 Bh 1.00 - 500.00


Bahan BOLT & NUT M 6 X 20 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 6 X 25 Bh 1.00 - 500.00


Bahan BOLT & NUT M 6 X 25 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 6 X 30 Bh 1.00 - 500.00


Bahan BOLT & NUT M 6 X 30 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 6 X 35 Bh 1.00 - 500.00


Bahan BOLT & NUT M 6 X 35 Bh 1.00 - - -

68(253) Satuan Pekerjaan


515379445.xls

BAHAN UPAH
NO. JENIS PEKERJAAN SATUAN VOLUME
SATUAN TOTAL SATUAN TOTAL
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 6 X 40 Bh 1.00 - 500.00


Bahan BOLT & NUT M 6 X 40 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 6 X 45 Bh 1.00 - 500.00


Bahan BOLT & NUT M 6 X 45 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 6 X 50 Bh 1.00 - 500.00


Bahan BOLT & NUT M 6 X 50 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 6 X 55 Bh 1.00 - 500.00


Bahan BOLT & NUT M 6 X 55 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 6 X 60 Bh 1.00 - 500.00


Bahan BOLT & NUT M 6 X 60 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 6 X 70 Bh 1.00 - 500.00


Bahan BOLT & NUT M 6 X 70 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 8 X 16 Bh 1.00 - 500.00


Bahan BOLT & NUT M 8 X 16 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 8 X 20 Bh 1.00 - 500.00


Bahan BOLT & NUT M 8 X 20 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

69(253) Satuan Pekerjaan


515379445.xls

BAHAN UPAH
NO. JENIS PEKERJAAN SATUAN VOLUME
SATUAN TOTAL SATUAN TOTAL

BOLT & NUT M 8 X 25 Bh 1.00 - 500.00


Bahan BOLT & NUT M 8 X 25 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 8 X 30 Bh 1.00 - 500.00


Bahan BOLT & NUT M 8 X 30 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 8 X 35 Bh 1.00 - 500.00


Bahan BOLT & NUT M 8 X 35 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 8 X 40 Bh 1.00 - 500.00


Bahan BOLT & NUT M 8 X 40 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 8 X 45 Bh 1.00 - 500.00


Bahan BOLT & NUT M 8 X 45 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 8 X 50 Bh 1.00 - 500.00


Bahan BOLT & NUT M 8 X 50 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 8 X 55 Bh 1.00 - 500.00


Bahan BOLT & NUT M 8 X 55 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 8 X 60 Bh 1.00 - 500.00


Bahan BOLT & NUT M 8 X 60 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

70(253) Satuan Pekerjaan


515379445.xls

BAHAN UPAH
NO. JENIS PEKERJAAN SATUAN VOLUME
SATUAN TOTAL SATUAN TOTAL
BOLT & NUT M 8 X 70 Bh 1.00 - 500.00
Bahan BOLT & NUT M 8 X 70 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 8 X 75 Bh 1.00 - 500.00


Bahan BOLT & NUT M 8 X 75 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 8 X 80 Bh 1.00 - 500.00


Bahan BOLT & NUT M 8 X 80 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 8 X 90 Bh 1.00 - 500.00


Bahan BOLT & NUT M 8 X 90 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 8 X 100 Bh 1.00 - 500.00


Bahan BOLT & NUT M 8 X 100 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 8 X 110 Bh 1.00 - 500.00


Bahan BOLT & NUT M 8 X 110 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 8 X 130 Bh 1.00 - 500.00


Bahan BOLT & NUT M 8 X 130 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 10 X 16 Bh 1.00 - 500.00


Bahan BOLT & NUT M 10 X 16 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 10 X 20 Bh 1.00 - 500.00

71(253) Satuan Pekerjaan


515379445.xls

BAHAN UPAH
NO. JENIS PEKERJAAN SATUAN VOLUME
SATUAN TOTAL SATUAN TOTAL
Bahan BOLT & NUT M 10 X 20 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 10 X 25 Bh 1.00 - 500.00


Bahan BOLT & NUT M 10 X 25 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 10 X 30 Bh 1.00 - 500.00


Bahan BOLT & NUT M 10 X 30 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 10 X 35 Bh 1.00 - 500.00


Bahan BOLT & NUT M 10 X 35 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 10 X 40 Bh 1.00 - 500.00


Bahan BOLT & NUT M 10 X 40 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 10 X 45 Bh 1.00 - 500.00


Bahan BOLT & NUT M 10 X 45 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 10 X 50 Bh 1.00 - 500.00


Bahan BOLT & NUT M 10 X 50 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 10 X 55 Bh 1.00 - 500.00


Bahan BOLT & NUT M 10 X 55 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 10 X 60 Bh 1.00 - 500.00


Bahan BOLT & NUT M 10 X 60 Bh 1.00 - - -

72(253) Satuan Pekerjaan


515379445.xls

BAHAN UPAH
NO. JENIS PEKERJAAN SATUAN VOLUME
SATUAN TOTAL SATUAN TOTAL
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 10 X 65 Bh 1.00 - 500.00


Bahan BOLT & NUT M 10 X 65 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 10 X 70 Bh 1.00 - 500.00


Bahan BOLT & NUT M 10 X 70 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 10 X 75 Bh 1.00 - 500.00


Bahan BOLT & NUT M 10 X 75 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 10 X 80 Bh 1.00 - 500.00


Bahan BOLT & NUT M 10 X 80 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 10 X 90 Bh 1.00 - 500.00


Bahan BOLT & NUT M 10 X 90 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 10 X 100 Bh 1.00 - 500.00


Bahan BOLT & NUT M 10 X 100 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 10 X 110 Bh 1.00 - 500.00


Bahan BOLT & NUT M 10 X 110 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 10 X 120 Bh 1.00 - 500.00


Bahan BOLT & NUT M 10 X 120 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

73(253) Satuan Pekerjaan


515379445.xls

BAHAN UPAH
NO. JENIS PEKERJAAN SATUAN VOLUME
SATUAN TOTAL SATUAN TOTAL

BOLT & NUT M 10 X 130 Bh 1.00 - 500.00


Bahan BOLT & NUT M 10 X 130 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 10 X 140 Bh 1.00 - 500.00


Bahan BOLT & NUT M 10 X 140 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 10 X 150 Bh 1.00 - 500.00


Bahan BOLT & NUT M 10 X 150 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 12 X 20 Bh 1.00 - 500.00


Bahan BOLT & NUT M 12 X 20 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 12 X 25 Bh 1.00 - 500.00


Bahan BOLT & NUT M 12 X 25 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 12 X 30 Bh 1.00 - 500.00


Bahan BOLT & NUT M 12 X 30 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 12 X 35 Bh 1.00 - 500.00


Bahan BOLT & NUT M 12 X 35 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 12 X 40 Bh 1.00 - 500.00


Bahan BOLT & NUT M 12 X 40 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

74(253) Satuan Pekerjaan


515379445.xls

BAHAN UPAH
NO. JENIS PEKERJAAN SATUAN VOLUME
SATUAN TOTAL SATUAN TOTAL
BOLT & NUT M 12 X 45 Bh 1.00 - 500.00
Bahan BOLT & NUT M 12 X 45 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 12 X 50 Bh 1.00 - 500.00


Bahan BOLT & NUT M 12 X 50 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 12 X 55 Bh 1.00 - 500.00


Bahan BOLT & NUT M 12 X 55 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 12 X 60 Bh 1.00 - 500.00


Bahan BOLT & NUT M 12 X 60 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 12 X 65 Bh 1.00 - 500.00


Bahan BOLT & NUT M 12 X 65 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 12 X 70 Bh 1.00 - 500.00


Bahan BOLT & NUT M 12 X 70 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 12 X 75 Bh 1.00 - 500.00


Bahan BOLT & NUT M 12 X 75 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 12 X 80 Bh 1.00 - 500.00


Bahan BOLT & NUT M 12 X 80 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 12 X 90 Bh 1.00 - 500.00

75(253) Satuan Pekerjaan


515379445.xls

BAHAN UPAH
NO. JENIS PEKERJAAN SATUAN VOLUME
SATUAN TOTAL SATUAN TOTAL
Bahan BOLT & NUT M 12 X 90 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 12 X 100 Bh 1.00 - 500.00


Bahan BOLT & NUT M 12 X 100 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 12 X 110 Bh 1.00 - 500.00


Bahan BOLT & NUT M 12 X 110 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 12 X 120 Bh 1.00 - 500.00


Bahan BOLT & NUT M 12 X 120 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 12 X 130 Bh 1.00 - 500.00


Bahan BOLT & NUT M 12 X 130 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 12 X 140 Bh 1.00 - 500.00


Bahan BOLT & NUT M 12 X 140 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 12 X 150 Bh 1.00 - 500.00


Bahan BOLT & NUT M 12 X 150 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 14 X 30 Bh 1.00 - 500.00


Bahan BOLT & NUT M 14 X 30 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 14 X 35 Bh 1.00 - 500.00


Bahan BOLT & NUT M 14 X 35 Bh 1.00 - - -

76(253) Satuan Pekerjaan


515379445.xls

BAHAN UPAH
NO. JENIS PEKERJAAN SATUAN VOLUME
SATUAN TOTAL SATUAN TOTAL
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 14 X 40 Bh 1.00 - 500.00


Bahan BOLT & NUT M 14 X 40 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 14 X 45 Bh 1.00 - 500.00


Bahan BOLT & NUT M 14 X 45 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 14 X 50 Bh 1.00 - 500.00


Bahan BOLT & NUT M 14 X 50 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 14 X 55 Bh 1.00 - 500.00


Bahan BOLT & NUT M 14 X 55 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 14 X 60 Bh 1.00 - 500.00


Bahan BOLT & NUT M 14 X 60 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 14 X 70 Bh 1.00 - 500.00


Bahan BOLT & NUT M 14 X 70 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 14 X 75 Bh 1.00 - 500.00


Bahan BOLT & NUT M 14 X 75 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 14 X 80 Bh 1.00 - 500.00


Bahan BOLT & NUT M 14 X 80 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

77(253) Satuan Pekerjaan


515379445.xls

BAHAN UPAH
NO. JENIS PEKERJAAN SATUAN VOLUME
SATUAN TOTAL SATUAN TOTAL

BOLT & NUT M 14 X 90 Bh 1.00 - 500.00


Bahan BOLT & NUT M 14 X 90 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 14 X 100 Bh 1.00 - 500.00


Bahan BOLT & NUT M 14 X 100 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 14 X 110 Bh 1.00 - 500.00


Bahan BOLT & NUT M 14 X 110 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 14 X 120 Bh 1.00 - 500.00


Bahan BOLT & NUT M 14 X 120 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 14 X 130 Bh 1.00 - 500.00


Bahan BOLT & NUT M 14 X 130 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 14 X 140 Bh 1.00 - 500.00


Bahan BOLT & NUT M 14 X 140 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 14 X 150 Bh 1.00 - 500.00


Bahan BOLT & NUT M 14 X 150 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 16 X 30 Bh 1.00 - 500.00


Bahan BOLT & NUT M 16 X 30 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

78(253) Satuan Pekerjaan


515379445.xls

BAHAN UPAH
NO. JENIS PEKERJAAN SATUAN VOLUME
SATUAN TOTAL SATUAN TOTAL
BOLT & NUT M 16 X 35 Bh 1.00 - 500.00
Bahan BOLT & NUT M 16 X 35 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 16 X 40 Bh 1.00 - 500.00


Bahan BOLT & NUT M 16 X 40 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 16 X 45 Bh 1.00 - 500.00


Bahan BOLT & NUT M 16 X 45 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 16 X 50 Bh 1.00 - 500.00


Bahan BOLT & NUT M 16 X 50 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 16 X 55 Bh 1.00 - 500.00


Bahan BOLT & NUT M 16 X 55 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 16 X 60 Bh 1.00 - 500.00


Bahan BOLT & NUT M 16 X 60 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 16 X 65 Bh 1.00 - 500.00


Bahan BOLT & NUT M 16 X 65 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 16 X 70 Bh 1.00 - 500.00


Bahan BOLT & NUT M 16 X 70 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 16 X 75 Bh 1.00 - 500.00

79(253) Satuan Pekerjaan


515379445.xls

BAHAN UPAH
NO. JENIS PEKERJAAN SATUAN VOLUME
SATUAN TOTAL SATUAN TOTAL
Bahan BOLT & NUT M 16 X 75 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 16 X 80 Bh 1.00 - 500.00


Bahan BOLT & NUT M 16 X 80 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 16 X 90 Bh 1.00 - 500.00


Bahan BOLT & NUT M 16 X 90 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 16 X 100 Bh 1.00 - 500.00


Bahan BOLT & NUT M 16 X 100 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 16 X 110 Bh 1.00 - 500.00


Bahan BOLT & NUT M 16 X 110 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 16 X 120 Bh 1.00 - 500.00


Bahan BOLT & NUT M 16 X 120 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 16 X 130 Bh 1.00 - 500.00


Bahan BOLT & NUT M 16 X 130 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 16 X 140 Bh 1.00 - 500.00


Bahan BOLT & NUT M 16 X 140 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 16 X 150 Bh 1.00 - 500.00


Bahan BOLT & NUT M 16 X 150 Bh 1.00 - - -

80(253) Satuan Pekerjaan


515379445.xls

BAHAN UPAH
NO. JENIS PEKERJAAN SATUAN VOLUME
SATUAN TOTAL SATUAN TOTAL
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 18 X 40 Bh 1.00 - 500.00


Bahan BOLT & NUT M 18 X 40 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 18 X 45 Bh 1.00 - 500.00


Bahan BOLT & NUT M 18 X 45 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 18 X 50 Bh 1.00 - 500.00


Bahan BOLT & NUT M 18 X 50 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 18 X 55 Bh 1.00 - 500.00


Bahan BOLT & NUT M 18 X 55 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 18 X 60 Bh 1.00 - 500.00


Bahan BOLT & NUT M 18 X 60 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 18 X 65 Bh 1.00 - 500.00


Bahan BOLT & NUT M 18 X 65 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 18 X 70 Bh 1.00 - 500.00


Bahan BOLT & NUT M 18 X 70 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 18 X 75 Bh 1.00 - 500.00


Bahan BOLT & NUT M 18 X 75 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

81(253) Satuan Pekerjaan


515379445.xls

BAHAN UPAH
NO. JENIS PEKERJAAN SATUAN VOLUME
SATUAN TOTAL SATUAN TOTAL

BOLT & NUT M 18 X 80 Bh 1.00 - 500.00


Bahan BOLT & NUT M 18 X 80 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 18 X 90 Bh 1.00 - 500.00


Bahan BOLT & NUT M 18 X 90 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 18 X 100 Bh 1.00 - 500.00


Bahan BOLT & NUT M 18 X 100 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 18 X 110 Bh 1.00 - 500.00


Bahan BOLT & NUT M 18 X 110 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 18 X 120 Bh 1.00 - 500.00


Bahan BOLT & NUT M 18 X 120 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 18 X 130 Bh 1.00 - 500.00


Bahan BOLT & NUT M 18 X 130 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 18 X 140 Bh 1.00 - 500.00


Bahan BOLT & NUT M 18 X 140 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 18 X 150 Bh 1.00 - 500.00


Bahan BOLT & NUT M 18 X 150 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

82(253) Satuan Pekerjaan


515379445.xls

BAHAN UPAH
NO. JENIS PEKERJAAN SATUAN VOLUME
SATUAN TOTAL SATUAN TOTAL
BOLT & NUT M 20 X 40 Bh 1.00 - 500.00
Bahan BOLT & NUT M 20 X 40 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 20 X 45 Bh 1.00 - 500.00


Bahan BOLT & NUT M 20 X 45 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 20 X 50 Bh 1.00 - 500.00


Bahan BOLT & NUT M 20 X 50 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 20 X 55 Bh 1.00 - 500.00


Bahan BOLT & NUT M 20 X 55 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 20 X 60 Bh 1.00 - 500.00


Bahan BOLT & NUT M 20 X 60 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 20 X 65 Bh 1.00 - 500.00


Bahan BOLT & NUT M 20 X 65 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 20 X 70 Bh 1.00 - 500.00


Bahan BOLT & NUT M 20 X 70 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 20 X 75 Bh 1.00 - 500.00


Bahan BOLT & NUT M 20 X 75 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 20 X 80 Bh 1.00 - 500.00

83(253) Satuan Pekerjaan


515379445.xls

BAHAN UPAH
NO. JENIS PEKERJAAN SATUAN VOLUME
SATUAN TOTAL SATUAN TOTAL
Bahan BOLT & NUT M 20 X 80 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 20 X 90 Bh 1.00 - 500.00


Bahan BOLT & NUT M 20 X 90 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 20 X 100 Bh 1.00 - 500.00


Bahan BOLT & NUT M 20 X 100 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 20 X 110 Bh 1.00 - 500.00


Bahan BOLT & NUT M 20 X 110 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 20 X 120 Bh 1.00 - 500.00


Bahan BOLT & NUT M 20 X 120 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 20 X 130 Bh 1.00 - 500.00


Bahan BOLT & NUT M 20 X 130 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 20 X 140 Bh 1.00 - 500.00


Bahan BOLT & NUT M 20 X 140 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 20 X 150 Bh 1.00 - 500.00


Bahan BOLT & NUT M 20 X 150 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 22 X 40 Bh 1.00 - 500.00


Bahan BOLT & NUT M 22 X 40 Bh 1.00 - - -

84(253) Satuan Pekerjaan


515379445.xls

BAHAN UPAH
NO. JENIS PEKERJAAN SATUAN VOLUME
SATUAN TOTAL SATUAN TOTAL
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 22 X 50 Bh 1.00 - 500.00


Bahan BOLT & NUT M 22 X 50 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 22 X 55 Bh 1.00 - 500.00


Bahan BOLT & NUT M 22 X 55 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 22 X 60 Bh 1.00 - 500.00


Bahan BOLT & NUT M 22 X 60 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 22 X 65 Bh 1.00 - 500.00


Bahan BOLT & NUT M 22 X 65 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 22 X 70 Bh 1.00 - 500.00


Bahan BOLT & NUT M 22 X 70 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 22 X 75 Bh 1.00 - 500.00


Bahan BOLT & NUT M 22 X 75 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 22 X 80 Bh 1.00 - 500.00


Bahan BOLT & NUT M 22 X 80 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 22 X 90 Bh 1.00 - 500.00


Bahan BOLT & NUT M 22 X 90 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

85(253) Satuan Pekerjaan


515379445.xls

BAHAN UPAH
NO. JENIS PEKERJAAN SATUAN VOLUME
SATUAN TOTAL SATUAN TOTAL

BOLT & NUT M 22 X 100 Bh 1.00 - 500.00


Bahan BOLT & NUT M 22 X 100 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 22 X 110 Bh 1.00 - 500.00


Bahan BOLT & NUT M 22 X 110 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 22 X 120 Bh 1.00 - 500.00


Bahan BOLT & NUT M 22 X 120 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 22 X 130 Bh 1.00 - 500.00


Bahan BOLT & NUT M 22 X 130 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 22 X 140 Bh 1.00 - 500.00


Bahan BOLT & NUT M 22 X 140 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 22 X 150 Bh 1.00 - 500.00


Bahan BOLT & NUT M 22 X 150 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 24 X 50 Bh 1.00 - 500.00


Bahan BOLT & NUT M 24 X 50 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 24 X 55 Bh 1.00 - 500.00


Bahan BOLT & NUT M 24 X 55 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

86(253) Satuan Pekerjaan


515379445.xls

BAHAN UPAH
NO. JENIS PEKERJAAN SATUAN VOLUME
SATUAN TOTAL SATUAN TOTAL
BOLT & NUT M 24 X 60 Bh 1.00 - 500.00
Bahan BOLT & NUT M 24 X 60 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 24 X 65 Bh 1.00 - 500.00


Bahan BOLT & NUT M 24 X 65 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 24 X 70 Bh 1.00 - 500.00


Bahan BOLT & NUT M 24 X 70 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 24 X 75 Bh 1.00 - 500.00


Bahan BOLT & NUT M 24 X 75 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 24 X 80 Bh 1.00 - 500.00


Bahan BOLT & NUT M 24 X 80 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 24 X 90 Bh 1.00 - 500.00


Bahan BOLT & NUT M 24 X 90 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 24 X 100 Bh 1.00 - 500.00


Bahan BOLT & NUT M 24 X 100 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 24 X 110 Bh 1.00 - 500.00


Bahan BOLT & NUT M 24 X 110 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 24 X 120 Bh 1.00 - 500.00

87(253) Satuan Pekerjaan


515379445.xls

BAHAN UPAH
NO. JENIS PEKERJAAN SATUAN VOLUME
SATUAN TOTAL SATUAN TOTAL
Bahan BOLT & NUT M 24 X 120 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 24 X 130 Bh 1.00 - 500.00


Bahan BOLT & NUT M 24 X 130 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 24 X 140 Bh 1.00 - 500.00


Bahan BOLT & NUT M 24 X 140 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 24 X 150 Bh 1.00 - 500.00


Bahan BOLT & NUT M 24 X 150 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 32 X 70 Bh 1.00 - 500.00


Bahan BOLT & NUT M 32 X 70 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 32 X 75 Bh 1.00 - 500.00


Bahan BOLT & NUT M 32 X 75 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 32 X 80 Bh 1.00 - 500.00


Bahan BOLT & NUT M 32 X 80 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 32 X 90 Bh 1.00 - 500.00


Bahan BOLT & NUT M 32 X 90 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 32 X 100 Bh 1.00 - 500.00


Bahan BOLT & NUT M 32 X 100 Bh 1.00 - - -

88(253) Satuan Pekerjaan


515379445.xls

BAHAN UPAH
NO. JENIS PEKERJAAN SATUAN VOLUME
SATUAN TOTAL SATUAN TOTAL
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 32 X 110 Bh 1.00 - 500.00


Bahan BOLT & NUT M 32 X 110 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 32 X 120 Bh 1.00 - 500.00


Bahan BOLT & NUT M 32 X 120 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 32 X 130 Bh 1.00 - 500.00


Bahan BOLT & NUT M 32 X 130 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 32 X 140 Bh 1.00 - 500.00


Bahan BOLT & NUT M 32 X 140 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

BOLT & NUT M 32 X 150 Bh 1.00 - 500.00


Bahan BOLT & NUT M 32 X 150 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

Nut M 12 Bh 1.00 - 500.00


Bahan Nut M 12 Bh 1.00 - - -
Upah Pasang Baut Hitam Bh 1.00 - - 500.00 500.00

Turn Buckle 5/8" Bh 1.00 - 16,163.66


Bahan Turn Buckle 5/8" Bh 1.00 - - -
Upah Pasang Turn Buckle Bh 1.00 - - 16,163.66 16,163.66

Turn Buckle 3/4" Bh 1.00 - 16,163.66


Bahan Turn Buckle 3/4" Bh 1.00 - - -
Upah Pasang Turn Buckle Bh 1.00 - - 16,163.66 16,163.66

89(253) Satuan Pekerjaan


515379445.xls

BAHAN UPAH
NO. JENIS PEKERJAAN SATUAN VOLUME
SATUAN TOTAL SATUAN TOTAL

Turn Buckle 1" Bh 1.00 - 16,163.66


Bahan Turn Buckle 1" Bh 1.00 - - -
Upah Pasang Turn Buckle Bh 1.00 - - 16,163.66 16,163.66

PEKERJAAN PASANGAN

Pasangan Bata M² 1.00 - 29,059.11


Bahan Bata 5 x 10 x 20 cm Bh 77.00 - - -
Semen PC Type 1 @ 50 Kg Zak 0.17 - - -
Pasir Pasang M³ 0.04 - - -
Upah Pasang Bata M² 1.00 - - 29,059.11 29,059.11

Pasangan Rooster M² 1.00 - 21,836.63


Bahan Rooster 5 x 10 x 20 cm Bh 77.00 - - -
Semen PC Type 1 @ 50 Kg Zak 0.17 - - -
Pasir Pasang M³ 0.04 - - -
Upah Pasang Rooster M² 1.00 - - 21,836.63 21,836.63

Pasangan Conblock M² 1.00 - #N/A


Bahan Conblock Bh 53.00 - - -
Pasir Pasang M³ 0.12 - - -
Upah Pasang Conblock M² 1.00 - - #N/A #N/A

Pasangan Rolag Bata M' 1.00 - 29,059.11


Bahan Bata 5 x 10 x 20 cm Bh 19.00 - - -
Semen PC Type 1 @ 50 Kg Zak 0.08 - - -
Pasir Pasang M³ 0.02 - - -
Upah Pasang Bata M' 1.00 - - 29,059.11 29,059.11

Acian Trowel M² 1.00 - 12,375.00


Bahan Sika - Chapdur kg 3.00 - - -

90(253) Satuan Pekerjaan


515379445.xls

BAHAN UPAH
NO. JENIS PEKERJAAN SATUAN VOLUME
SATUAN TOTAL SATUAN TOTAL
Upah Acian Trowel M² 1.00 - - 12,375.00 12,375.00

Acian M² 1.00 - 8,735.10


Bahan Semen PC Type 1 @ 50 Kg Zak 0.07 - - -
Upah Acian M² 1.00 - - 8,735.10 8,735.10

Plesteran 1:4 + Acian M² 1.00 - 21,836.63


Bahan Semen PC Type 1 @ 50 Kg Zak 0.18 - - -
Pasir Pasang M³ 0.02 - - -
Upah Plester 1:4 + Aci M² 1.00 - - 21,836.63 21,836.63

Plesteran 1:2 + Acian M² 1.00 - 21,836.63


Bahan Semen PC Type 1 @ 50 Kg Zak 0.29 - - -
Pasir Pasang M³ 0.02 - - -
Upah Plester 1:2 + Aci M² 1.00 - - 21,836.63 21,836.63

Pasangan 1 Bata Tahan Api M² 1.00 - #N/A


Bahan Bata Tahan Api 6 x 11,4 x 23 cm Bh 73.00 - - -
Semen Tahan Api @ 50 Kg Zak 0.40 - - -
Pasir Pasang M³ 0.04 - - -
Upah Pasang Bata Tahan Api 1 Bata M² 1.00 - - #N/A #N/A

Pasangan 1/2 Bata Tahan Api M² 1.00 - #N/A


Bahan Bata Tahan Api 6 x 11,4 x 23 cm Bh 37.00 - - -
Semen Tahan Api @ 50 Kg Zak 0.40 - - -
Pasir Pasang M³ 0.04 - - -
Upah Pasang Bata Tahan Api 1/2 Bata M² 1.00 - - #N/A #N/A

Pasangan Bata Press 1/2 Bata M² 1.00 - 29,059.11


Bahan Bata 5 x 10 x 20 cm Bh 77.00 - - -
Semen PC Type 1 @ 50 Kg Zak 0.17 - - -
Pasir Pasang M³ 0.04 - - -
Upah Pasang Bata Press 1/2 Bata M² 1.00 - - 29,059.11 29,059.11

91(253) Satuan Pekerjaan


515379445.xls

BAHAN UPAH
NO. JENIS PEKERJAAN SATUAN VOLUME
SATUAN TOTAL SATUAN TOTAL

Pasangan Bata Press 1-1/2 Bata M² 1.00 - 58,117.75


Bahan Bata 5 x 10 x 20 cm Bh 120.00 - - -
Semen PC Type 1 @ 50 Kg Zak 0.26 - - -
Pasir Pasang M³ 0.06 - - -
Upah Pasang Bata Press 1-1/2 Bata M² 1.00 - - 58,117.75 58,117.75

Pembuatan Pilar Unit 1.00 - 1,210,000.00


Bahan - - - -
Upah Pasang Pilar Unit 1.00 - - 1,210,000.00 1,210,000.00

PEKERJAAN KUDA-KUDA KAYU

Perkayuan Kap M³ 1.00 - 1,359,760.25


Bahan Kayu kelas II M³ 1.10 - - -
Upah Perkayuan Kap M³ 1.00 - - 1,359,760.25 1,359,760.25

Lisplank M' 1.00 - 16,335.00


Bahan Kayu Papan 3/25 - 4 m Btg 0.28 - - - -
Paku 3" Kg 0.10 - - -
Upah Pasang Lisplank M' 1.00 - - 16,335.00 16,335.00

PEKERJAAN PENUTUP ATAP & CLADDING

Penutup Atap Spandek M² 1.00 - 15,125.00


Bahan Penutup Atap Spandek M² 1.05 - - -
Tapping Screw Bh 2.00 - - -
Upah Pasang Penutup Atap Spandek M² 1.00 - - 15,125.00 15,125.00

Rabung Spandek M' 1.00 - 12,100.00


Bahan Rabung Spandek M' 1.00 - - -
Tapping Screw Bh 5.00 - - -
Upah Pasang Rabung Spandek M' 1.00 - - 12,100.00 12,100.00

92(253) Satuan Pekerjaan


515379445.xls

BAHAN UPAH
NO. JENIS PEKERJAAN SATUAN VOLUME
SATUAN TOTAL SATUAN TOTAL

Clading Trimdek M² 1.00 - 15,730.00


Bahan Clading Trimdek M² 1.05 - - -
Tapping Screw Bh 5.00 - - -
Upah Pasang Clading Trimdek M² 1.00 - - 15,730.00 15,730.00

Flashing M² 1.00 - 12,100.00


Bahan Flashing M² 1.05 - - -
Tapping Screw Bh 5.00 - - -
Upah Pasang Flashing M² 1.00 - - 12,100.00 12,100.00

Corner Flashing M² 1.00 - 12,100.00


Bahan Corner Flashing M² 1.05 - - -
Tapping Screw Bh 5.00 - - -
Upah Pasang Corner Flashing M² 1.00 - - 12,100.00 12,100.00

Flashing Talang M² 1.00 - 12,100.00


Bahan Flashing Talang M² 1.05 - - -
Tapping Screw Bh 5.00 - - -
Upah Pasang Flashing Talang M² 1.00 - - 12,100.00 12,100.00

Penutup Atap Multi Roof M² 1.00 - 15,125.00


Bahan Penutup Atap Multi Roof M² 1.05 - - -
Upah Pasang Penutup Atap Multi Roof M² 1.00 - - 15,125.00 15,125.00

Rabung Multi Roof M' 1.00 - 12,100.00


Bahan Rabung Multi Roof M' 1.05 - - -
Upah Pasang Rabung Multi Roof M' 1.00 - - 12,100.00 12,100.00

Nok Samping Multi Roof M' 1.00 - 12,100.00


Bahan Nok Samping Multi Roof M' 1.00 - - -
Upah Pasang Nok Samping Multi Roof M' 1.00 - - 12,100.00 12,100.00

93(253) Satuan Pekerjaan


515379445.xls

BAHAN UPAH
NO. JENIS PEKERJAAN SATUAN VOLUME
SATUAN TOTAL SATUAN TOTAL
Talang Seng M' 1.00 - 12,100.00
Bahan M' 1.00 - - - -
Upah Pasang Nok Samping Multi Roof M' 1.00 - - 12,100.00 12,100.00

Rangka Atap Multi Truss Atap Multi Roof M² 1.00 - 87,725.00


Bahan Profil C 75.100 m' 1.49 - - - -
Profil C 75.75 m' 2.23 - - - -
Tapping Screw Bh 28.00 - - -
Dynabolt 12 - 120 mm Bh 1.60 - - -
Reng Profil U 30.45 m' 5.40 - - - -
Talang Jurai Profil C 75.75 m' 0.12 - - - -
Upah Pasang Rangka Atap Multi Truss M² 1.00 - - 87,725.00 87,725.00

Dinding Wiremesh M² 1.00 - 15,730.00


Bahan M² 1.05 - - - -
Upah Pasang Dinding Wiremesh M² 1.00 - - 15,730.00 15,730.00

PEKERJAAN PLAFOND

Plafond M² 1.00 - 30,250.00


Bahan Kayu Balok 5/7 - 4 m Btg 0.90 - - - -
Kayu Balok 4/6 - 4 m Btg 0.15 - - - -
Paku 3" Kg 0.10 - - -
Paku 2,5" Kg 0.15 - - -
Triplek 4 mm M² 1.05 - - -
Paku Triplek Kg 0.10 - - -
Upah Pasang Plafond M² 1.00 - - 30,250.00 30,250.00

Skirting Plafond M' 1.00 - 9,801.00


Bahan List Profil 50 mm M' 1.00 - - -
Paku 2" Kg 0.01 - - -
Upah Pasang Skirting Plafond M' 1.00 - - 9,801.00 9,801.00

94(253) Satuan Pekerjaan


515379445.xls

BAHAN UPAH
NO. JENIS PEKERJAAN SATUAN VOLUME
SATUAN TOTAL SATUAN TOTAL

List Plafond M' 1.00 - 8,081.83


Bahan Triplek 4 mm M² 0.10 - - -
Paku Triplek Kg 0.01 - - -
Upah Pasang List Plafond M' 1.00 - - 8,081.83 8,081.83

PEKERJAAN KERAMIK

Keramik Lantai 40 x 40 cm M² 1.00 - 32,326.11


Bahan Keramik 40 x 40 cm Dus 1.06 - - -
Semen PC Type 1 @ 50 Kg Zak 0.20 - - -
Semen Putih Zak 0.01 - - -
Pasir Pasang M³ 0.04 - - -
Benang Nylon Rol 0.01 - - -
Upah Pasang Keramik Lantai 40 x 40 cm M² 1.00 - - 32,326.11 32,326.11

Keramik Lantai 33 x 33 cm M² 1.00 - 32,326.11


Bahan Keramik 33 x 33 cm Dus 1.06 - - -
Semen PC Type 1 @ 50 Kg Zak 0.20 - - -
Semen Putih Zak 0.01 - - -
Pasir Pasang M³ 0.04 - - -
Benang Nylon Rol 0.01 - - -
Upah Pasang Keramik Lantai 33 x 33 cm M² 1.00 - - 32,326.11 32,326.11

Keramik Lantai 30 x 30 cm M² 1.00 - 32,326.11


Bahan Keramik 30 x 30 cm Dus 1.06 - - -
Semen PC Type 1 @ 50 Kg Zak 0.20 - - -
Semen Putih Zak 0.01 - - -
Pasir Pasang M³ 0.04 - - -
Benang Nylon Rol 0.01 - - -
Upah Pasang Keramik Lantai 30 x 30 cm M² 1.00 - - 32,326.11 32,326.11

Keramik Lantai 20 x 20 cm M² 1.00 - 32,326.11

95(253) Satuan Pekerjaan


515379445.xls

BAHAN UPAH
NO. JENIS PEKERJAAN SATUAN VOLUME
SATUAN TOTAL SATUAN TOTAL
Bahan Keramik 20 x 20 cm Dus 1.06 - - -
Semen PC Type 1 @ 50 Kg Zak 0.20 - - -
Semen Putih Zak 0.01 - - -
Pasir Pasang M³ 0.04 - - -
Benang Nylon Rol 0.01 - - -
Upah Pasang Keramik Lantai 20 x 20 cm M² 1.00 - - 32,326.11 32,326.11

Keramik Meja 10 x 20 cm M² 1.00 - 40,407.63


Bahan Keramik 10 x 20 cm Dus 1.06 - - -
Semen PC Type 1 @ 50 Kg Zak 0.20 - - -
Semen Putih Zak 0.01 - - -
Pasir Pasang M³ 0.04 - - -
Benang Nylon Rol 0.01 - - -
Upah Pasang Keramik Meja 10 x 20 cm M² 1.00 - - 40,407.63 40,407.63

Keramik Meja 20 x 20 cm M² 1.00 - 40,407.63


Bahan Keramik 20 x 20 cm Dus 1.06 - - -
Semen PC Type 1 @ 50 Kg Zak 0.20 - - -
Semen Putih Zak 0.01 - - -
Pasir Pasang M³ 0.04 - - -
Benang Nylon Rol 0.01 - - -
Upah Pasang Keramik Meja 10 x 20 cm M² 1.00 - - 40,407.63 40,407.63

Keramik Dinding 20 x 20 cm M² 1.00 - 40,407.63


Bahan Keramik 20 x 20 cm Dus 1.06 - - -
Semen PC Type 1 @ 50 Kg Zak 0.20 - - -
Semen Putih Zak 0.01 - - -
Pasir Pasang M³ 0.04 - - -
Benang Nylon Rol 0.01 - - -
Upah Pasang Keramik Dinding 20 x 20 cm M² 1.00 - - 40,407.63 40,407.63

Keramik Dinding 10 x 20 cm M² 1.00 - 40,407.63


Bahan Keramik 10 x 20 cm Dus 1.06 - - -

96(253) Satuan Pekerjaan


515379445.xls

BAHAN UPAH
NO. JENIS PEKERJAAN SATUAN VOLUME
SATUAN TOTAL SATUAN TOTAL
Semen PC Type 1 @ 50 Kg Zak 0.20 - - -
Semen Putih Zak 0.01 - - -
Pasir Pasang M³ 0.04 - - -
Benang Nylon Rol 0.01 - - -
Upah Pasang Keramik Dinding 10 x 20 cm M² 1.00 - - 40,407.63 40,407.63

Keramik Dinding 20 x 40 cm M² 1.00 - #N/A


Bahan Keramik 20 x 40 cm Dus 1.06 - - -
Semen PC Type 1 @ 50 Kg Zak 0.20 - - -
Semen Putih Zak 0.01 - - -
Pasir Pasang M³ 0.04 - - -
Benang Nylon Rol 0.01 - - -
Upah Pasang Keramik Dinding 10 x 40 cm M² 1.00 - - #N/A #N/A

Plint Keramik 10 x 40 cm m' 1.00 - 8,081.53


Bahan Keramik 10 x 40 cm Dus 1.06 - - -
Semen PC Type 1 @ 50 Kg Zak 0.20 - - -
Semen Putih Zak 0.01 - - -
Pasir Pasang M³ 0.04 - - -
Benang Nylon Rol 0.01 - - -
Upah Pasang Plint Keramik 10 x 40 cm M² 1.00 - - 8,081.53 8,081.53

PEKERJAAN PENGECATAN

Pengecatan Dinding M² 1.00 - 12,035.63


Bahan Cat Tembok Kg 0.25 - - - -
Cat Plamir Kg 0.10 - - - -
Upah Pengecatan Dinding M² 1.00 - - 12,035.63 12,035.63

Pengecatan Plafond M² 1.00 - - 12,035.63


Bahan Cat Tembok Kg 0.35 - - - -
Upah Pengecatan Plafond M² 1.00 - - 12,035.63 12,035.63

97(253) Satuan Pekerjaan


515379445.xls

BAHAN UPAH
NO. JENIS PEKERJAAN SATUAN VOLUME
SATUAN TOTAL SATUAN TOTAL
Pengecatan Kusen M² 1.00 - - 16,163.66
Bahan Dempul Kayu Kg 0.02 - - -
Cat Meni Kayu Kg 0.08 - - -
Cat Minyak Kg 0.13 - - -
Thinner Ltr 0.08 - - -
Upah Pengecatan Kusen M² 1.00 - - 16,163.66 16,163.66

Pengecatan Pintu & Jendela M² 1.00 - - 14,443.04


Bahan Dempul Kayu Kg 0.02 - - -
Cat Meni Kayu Kg 0.08 - - -
Cat Minyak Kg 0.13 - - -
Thinner Ltr 0.08 - - -
Upah Pengecatan Pintu & Jendela M² 1.00 - - 14,443.04 14,443.04

Pengecatan Baja Kg 1.00 - - 473.35


Bahan Cat Baja Kg 0.01 - - - -
Cat Meni Besi Kg 0.01 - - - -
Thinner Ltr 0.00 - - -
Upah Pengecatan Baja Kg 1.00 - - 473.35 473.35

Coalter Kuda-Kuda M² 1.00 - 6,534.00


Bahan Coalter/Residu Kg 0.20 - - -
Solar Ltr 0.01 - - -
Upah Coalter Kuda-Kuda M² 1.00 - - 6,534.00 6,534.00

Pengecatan Listplank M' 1.00 - 8,081.83


Bahan Dempul Kayu Kg 0.02 - - -
Cat Meni Kayu Kg 0.08 - - -
Cat Minyak Kg 0.13 - - -
Thinner Ltr 0.08 - - -
Upah Pengecatan Listplank M' 1.00 - - 8,081.83 8,081.83

Pembersihan M² 1.00 - 6,534.00

98(253) Satuan Pekerjaan


515379445.xls

BAHAN UPAH
NO. JENIS PEKERJAAN SATUAN VOLUME
SATUAN TOTAL SATUAN TOTAL
Upah Pembersihan M² 1.00 - - 6,534.00 6,534.00

PEKERJAAN SANITAIR

Pipa PVC Ø 1/2" AW M' 1.00 - 24,072.71


Bahan Pipa PVC Ø 1/2" AW - 4 m Btg 0.28 - - -
Upah Pasang Pipa PVC M' 1.00 - - 24,072.71 24,072.71

Pipa PVC Ø 3/4" AW M' 1.00 - 24,072.71


Bahan Pipa PVC Ø 3/4" AW - 4 m Btg 0.28 - - -
Upah Pasang Pipa PVC M' 1.00 - - 24,072.71 24,072.71

Pipa PVC Ø 1" AW M' 1.00 - 24,072.71


Bahan Pipa PVC Ø 1" AW - 4 m Btg 0.28 - - -
Upah Pasang Pipa PVC M' 1.00 - - 24,072.71 24,072.71

Pipa PVC Ø 4" D M' 1.00 - 24,072.71


Bahan Pipa PVC Ø 4" D - 4 m Btg 0.28 - - -
Upah Pasang Pipa PVC M' 1.00 - - 24,072.71 24,072.71

Pipa PVC Ø 3" D M' 1.00 - 24,072.71


Bahan Pipa PVC Ø 3" D - 4 m Btg 0.28 - - -
Upah Pasang Pipa PVC M' 1.00 - - 24,072.71 24,072.71

Pipa PVC Ø 2" D M' 1.00 - 24,072.71


Bahan Pipa PVC Ø 2" D - 4 m Btg 0.28 - - -
Upah Pasang Pipa PVC M' 1.00 - - 24,072.71 24,072.71

Pipa PVC Ø 1-1/2" D M' 1.00 - 24,072.71


Bahan Pipa PVC Ø 1-1/2" D - 4 m Btg 0.28 - - -
Upah Pasang Pipa PVC M' 1.00 - - 24,072.71 24,072.71

Pipa PVC Ø 1-1/4" D M' 1.00 - 24,072.71

99(253) Satuan Pekerjaan


515379445.xls

BAHAN UPAH
NO. JENIS PEKERJAAN SATUAN VOLUME
SATUAN TOTAL SATUAN TOTAL
Bahan Pipa PVC Ø 1-1/4" D - 4 m Btg 0.28 - - -
Upah Pasang Pipa PVC M' 1.00 - - 24,072.71 24,072.71

Urinoir Bh 1.00 - 283,713.54


Bahan Urinoir Bh 1.00 - - -
Upah Pasang Urinoir Bh 1.00 - - 283,713.54 283,713.54

Closet Jongkok Bh 1.00 - 141,856.04


Bahan Closet Jongkok Bh 1.00 - - -
Upah Pasang Closet Jongkok Bh 1.00 - - 141,856.04 141,856.04

Closet Duduk Bh 1.00 - 283,713.54


Bahan Closet Duduk Bh 1.00 - - -
Perlengkapan Ls 1.00 - -
Upah Pasang Closet Duduk Bh 1.00 - - 283,713.54 283,713.54

Wastafel Bh 1.00 - 141,856.04


Bahan Wastafel Bh 1.00 - - -
Perlengkapan Ls 1.00 - -
Upah Pasang Wastafel Bh 1.00 - - 141,856.04 141,856.04

Tempat Sabun Bh 1.00 - 32,325.88


Bahan Tempat Sabun Bh 1.00 - - -
Upah Pasang Tempat Sabun Bh 1.00 - - 32,325.88 32,325.88

Floor Drain Bh 1.00 - 8,081.83


Bahan Floor Drain Bh 1.00 - - -
Upah Pasang Floor Drain Bh 1.00 - - 8,081.83 8,081.83

Keran Air Bh 1.00 - 8,081.83


Bahan Keran Air Bh 1.00 - - -
Upah Pasang Keran Air Bh 1.00 - - 8,081.83 8,081.83

100(253) Satuan Pekerjaan


515379445.xls

BAHAN UPAH
NO. JENIS PEKERJAAN SATUAN VOLUME
SATUAN TOTAL SATUAN TOTAL
Cermin M² 1.00 - 24,072.71
Bahan Cermin M² 1.00 - - -
Upah Pasang Cermin M² 1.00 - - 24,072.71 24,072.71

Kitchen Zinch 1 Lubang Bh 1.00 - 141,856.04


Bahan Kitchen Zinch 1 Lubang Bh 1.00 - - -
Kran Air Stainless Steel 1/2" Leher Angsa Bh 1.00 - - -
Upah Pasang Kitchen Zinch Bh 1.00 - - 141,856.04 141,856.04

Kitchen Zinch 2 Lubang Bh 1.00 - 141,856.04


Bahan Kitchen Zinch 2 Lubang Bh 1.00 - - -
Kran Air Stainless Steel 1/2" Leher Angsa Bh 2.00 - - -
Upah Pasang Kitchen Zinch Bh 1.00 - - 141,856.04 141,856.04

Pasang Tandon Bh 1.00 - 141,856.04


Bahan Bh 1.00 - - - -
Upah Pasang Kitchen Zinch Bh 1.00 - - 141,856.04 141,856.04

Membuat Dudukan Tandon Unit 1.00 - 1,210,000.00


Bahan Unit 1.00 - - - -
Upah Membuat Dudukan Tandon Unit 1.00 - - 1,210,000.00 1,210,000.00

PEKERJAAN INSTALASI LISTRIK

Instalasi Titik Lampu Ttk 1.00 - 48,489.54


Bahan Kabel NYA 1 x 1.5 mm Rol 0.24 - - -
Isolator Plastik Bh 2.00 - - -
Paku Asbes 2,5" + Karet Bh 2.00 - - -
Isolasi Unibel Rol 0.07 - - -
Benang Kasur Rol 0.07 - - -
Upah Instalasi Titik Lampu Ttk 1.00 - - 48,489.54 48,489.54

Saklar Ganda Bh 1.00 - 8,081.83

101(253) Satuan Pekerjaan


515379445.xls

BAHAN UPAH
NO. JENIS PEKERJAAN SATUAN VOLUME
SATUAN TOTAL SATUAN TOTAL
Bahan Saklar Ganda Bh 1.00 - - -
Upah Pasang Saklar Bh 1.00 - - 8,081.83 8,081.83

Saklar Tunggal Bh 1.00 - 8,081.83


Bahan Saklar Tunggal Bh 1.00 - - -
Upah Pasang Saklar Bh 1.00 - - 8,081.83 8,081.83

Saklar Gantung Bh 1.00 - 8,081.83


Bahan Saklar Gantung Bh 1.00 - - -
Upah Pasang Saklar Bh 1.00 - - 8,081.83 8,081.83

Lampu Pijar 25 Watt Bh 1.00 - 24,072.71


Bahan Lampu Pijar 25 Watt Bh 1.00 - - -
Upah Pasang Lampu Bh 1.00 - - 24,072.71 24,072.71

Lampu TL 10 Watt Bh 1.00 - 24,072.71


Bahan Lampu TL 10 Watt Bh 1.00 - - -
Upah Pasang Lampu Bh 1.00 - - 24,072.71 24,072.71

Lampu TL 20 Watt Bh 1.00 - 24,072.71


Bahan Lampu TL 20 Watt Bh 1.00 - - -
Upah Pasang Lampu Bh 1.00 - - 24,072.71 24,072.71

Lampu TL 40 Watt Bh 1.00 - 24,072.71


Bahan Lampu TL 40 Watt Bh 1.00 - - -
Upah Pasang Lampu Bh 1.00 - - 24,072.71 24,072.71

Lampu TL 18 Watt Bh 1.00 - 24,072.71


Bahan Lampu TL 18 Watt Bh 1.00 - - -
Upah Pasang Lampu Bh 1.00 - - 24,072.71 24,072.71

Lampu TL 36 Watt Bh 1.00 - 24,072.71


Bahan Lampu TL 36 Watt Bh 1.00 - - -

102(253) Satuan Pekerjaan


515379445.xls

BAHAN UPAH
NO. JENIS PEKERJAAN SATUAN VOLUME
SATUAN TOTAL SATUAN TOTAL
Upah Pasang Lampu Bh 1.00 - - 24,072.71 24,072.71

Lampu TL 2X20 Watt Bh 1.00 - 24,072.71


Bahan Lampu TL 2X20 Watt Bh 1.00 - - -
Upah Pasang Lampu Bh 1.00 - - 24,072.71 24,072.71

Lampu TL 2X40 Watt Bh 1.00 - 24,072.71


Bahan Lampu TL 2X40 Watt Bh 1.00 - - -
Upah Pasang Lampu Bh 1.00 - - 24,072.71 24,072.71

Lampu TL 2X18 Watt Bh 1.00 - 24,072.71


Bahan Lampu TL 2X18 Watt Bh 1.00 - - -
Upah Pasang Lampu Bh 1.00 - - 24,072.71 24,072.71

Lampu TL 2X36 Watt Bh 1.00 - 24,072.71


Bahan Lampu TL 2X36 Watt Bh 1.00 - - -
Upah Pasang Lampu Bh 1.00 - - 24,072.71 24,072.71

Lampu SL 12 Watt Bh 1.00 - 24,072.71


Bahan Lampu SL 12 Watt Bh 1.00 - - -
Upah Pasang Lampu Bh 1.00 - - 24,072.71 24,072.71

Lampu SL 15 Watt Bh 1.00 - 24,072.71


Bahan Lampu SL 15 Watt Bh 1.00 - - -
Upah Pasang Lampu Bh 1.00 - - 24,072.71 24,072.71

Stop Kontak Bh 1.00 - 8,081.83


Bahan Stop Kontak Bh 1.00 - - -
Upah Pasang Stop Kontak Bh 1.00 - - 8,081.83 8,081.83

Stop Kontak AC Bh 1.00 - 8,081.83


Bahan Stop Kontak AC Bh 1.00 - - -
Upah Pasang Stop Kontak Bh 1.00 - - 8,081.83 8,081.83

103(253) Satuan Pekerjaan


515379445.xls

BAHAN UPAH
NO. JENIS PEKERJAAN SATUAN VOLUME
SATUAN TOTAL SATUAN TOTAL

Air Conditioning 1/2 PK Bh 1.00 - #N/A


Bahan Air Conditioning 1/2 PK Bh 1.00 - - -
Upah Pasang Air Conditioning Bh 1.00 - - #N/A #N/A

Air Conditioning 3/4 PK Bh 1.00 - #N/A


Bahan Air Conditioning 3/4 PK Bh 1.00 - - -
Upah Pasang Air Conditioning Bh 1.00 - - #N/A #N/A

Air Conditioning 1 PK Bh 1.00 - #N/A


Bahan Air Conditioning 1 PK Bh 1.00 - - -
Upah Pasang Air Conditioning Bh 1.00 - - #N/A #N/A

Air Conditioning 1-1/2 PK Bh 1.00 - #N/A


Bahan Air Conditioning 1-1/2 PK Bh 1.00 - - -
Upah Pasang Air Conditioning Bh 1.00 - - #N/A #N/A

Air Conditioning 2 PK Bh 1.00 - #N/A


Bahan Air Conditioning 2 PK Bh 1.00 - - -
Upah Pasang Air Conditioning Bh 1.00 - - #N/A #N/A

Exhaust Fan Bh 1.00 - #N/A


Bahan Exhaust Fan Bh 1.00 - - -
Upah Pasang Exhaust Fan Bh 1.00 - - #N/A #N/A

Arde Copper Rod Ø 19 mm M' 1.00 - #N/A


Bahan Arde Copper Rod Ø 19 mm M' 1.10 - - -
Upah Pasang Arde Copper Rod M' 1.00 - - #N/A #N/A

PEKERJAAN KUSEN, PINTU & JENDELA

Pasang Pintu Bh 1.00 - 88,553.12

104(253) Satuan Pekerjaan


515379445.xls

BAHAN UPAH
NO. JENIS PEKERJAAN SATUAN VOLUME
SATUAN TOTAL SATUAN TOTAL
Upah Pasang Pintu Bh 1.00 - - 88,553.12 88,553.12

Pasang Jendela Bh 1.00 - 40,407.71


Upah Pasang Jendela Bh 1.00 - - 40,407.71 40,407.71

Pasang Boven Bh 1.00 - 40,407.71


Upah Pasang Jendela Bh 1.00 - - 40,407.71 40,407.71

Pasang Kusen m2 1.00 - 20,977.04


Upah Pasang Kusen m2 1.00 - - 20,977.04 20,977.04

Fabrikasi Kusen Kayu m' 1.00 - 27,511.04


Bahan Kayu Balok 6/15 - 4 m btg 0.35 - - - -
Paku 3" kg 0.02 - - -
Upah Fabrikasi Kusen Kayu m' 1.00 - - 27,511.04 27,511.04

Fabrikasi Daun Pintu Panel m2 1.00 - 213,400.00


Bahan Kayu Papan 4/20 - 4 m btg 1.35 - - - -
Upah Fabrikasi Daun Pintu Panel m2 1.00 - - 213,400.00 213,400.00

Fabrikasi Daun Pintu Triplek m2 1.00 - 170,720.00


Bahan Kayu Papan 4/20 - 4 m btg 1.55 - - - -
Triplek 4 mm lbr 1.55 - - -
Paku Triplek kg 0.03 - - -
Upah Fabrikasi Daun Pintu Triplek m2 1.00 - - 170,720.00 170,720.00

Fabrikasi Daun Jendela m2 1.00 - 213,400.00


Bahan Kayu Papan 4/20 - 4 m btg 1.35 - - - -
Upah Fabrikasi Daun Pintu Panel m2 1.00 - - 213,400.00 213,400.00

Fabrikasi Kusen Aluminium m' 1.00 - -


Bahan - - - -
- - - -

105(253) Satuan Pekerjaan


515379445.xls

BAHAN UPAH
NO. JENIS PEKERJAAN SATUAN VOLUME
SATUAN TOTAL SATUAN TOTAL
Upah m' 1.00 - - - -

Fabrikasi Pintu Aluminium + Kaca m2 1.00 - -


Bahan - - - -
- - - -
Upah m2 1.00 - - - -

Fabrikasi Pintu KM Aluminium m2 1.00 - -


Bahan - - - -
- - - -
Upah m2 1.00 - - - -

Fabrikasi Jendela Aluminium + Kaca m2 1.00 - -


Bahan - - - -
- - - -
Upah m2 1.00 - - - -

Fabrikasi Jendela Aluminium m2 1.00 - -


Bahan - - - -
- - - -
Upah m2 1.00 - - - -

Pintu Type P-1 (Kantor) Bh 1.00 - #N/A


Kusen
Bahan Kayu Balok 5/15 - 4 m Btg 2.13 - - - -
Paku 3" Kg 0.02 - - -
Upah Fabrikasi Kusen Kayu M' 8.50 - - 27,511.04 233,843.87
Pasang Kusen M² 4.25 - - 20,977.04 89,152.44
Kaca Kusen
Bahan Kaca Rayban 5 mm M² 0.52 - - -
Upah Pasang Kaca M² 0.52 - - 13,756.25 7,153.25
Daun Pintu
Bahan Kayu Papan 4/20 - 4 m Btg 1.68 - - - -

106(253) Satuan Pekerjaan


515379445.xls

BAHAN UPAH
NO. JENIS PEKERJAAN SATUAN VOLUME
SATUAN TOTAL SATUAN TOTAL
Kaca Rayban 5 mm M² 2.37 - - -
Upah Fabrikasi Pintu Panel Bh 2.00 - - #N/A #N/A
Pasang Pintu Bh 2.00 - - 88,553.12 177,106.25
Pasang Kaca M² 2.37 - - 13,756.25 32,602.31
Angkur Kusen
Bahan Besi Beton Polos Ø 10 mm Kg 0.74 - - -
Upah Pembesian Besi Beton Polos Kg 0.74 - - 2,923.11 2,163.10

Pintu Type P-2 (Kantor) Bh 1.00 - #N/A


Kusen
Bahan Kayu Balok 5/15 - 4 m Btg 1.70 - - - -
Paku 3" Kg 0.02 - - -
Upah Fabrikasi Kusen Kayu M' 6.80 - - 27,511.04 187,075.10
Pasang Kusen M² 2.50 - - 20,977.04 52,442.61
Kaca Kusen
Bahan Kaca Rayban 5 mm M² 0.29 - - -
Upah Pasang Kaca M² 0.29 - - 13,756.25 3,989.31
Daun Pintu
Bahan Kayu Papan 4/20 - 4 m Btg 2.40 - - - -
Upah Fabrikasi Pintu Panel Bh 1.00 - - #N/A #N/A
Pasang Pintu Bh 1.00 - - 88,553.12 88,553.12
Angkur Kusen
Bahan Besi Beton Polos Ø 10 mm Kg 0.74 - - -
Upah Pembesian Besi Beton Polos Kg 0.74 - - 2,923.11 2,163.10

Pintu Type P-3 (Kantor) Bh 1.00 - #N/A


Kusen
Bahan Kayu Balok 5/15 - 4 m Btg 1.28 - - - -
Paku 3" Kg 0.02 - - -
Upah Fabrikasi Kusen Kayu M' 5.10 - - 27,511.04 140,306.32
Pasang Kusen M² 1.94 - - 20,977.04 40,695.47
Daun Pintu
Bahan Kayu Papan 4/20 - 4 m Btg 0.84 - - - -

107(253) Satuan Pekerjaan


515379445.xls

BAHAN UPAH
NO. JENIS PEKERJAAN SATUAN VOLUME
SATUAN TOTAL SATUAN TOTAL
Triplek 4 mm M² 3.46 - - -
Upah Fabrikasi Pintu Triplek Bh 1.00 - - #N/A #N/A
Pasang Pintu Bh 1.00 - - 88,553.12 88,553.12
Angkur Kusen
Bahan Besi Beton Polos Ø 10 mm Kg 0.74 - - -
Upah Pembesian Besi Beton Polos Kg 0.74 - - 2,923.11 2,163.10

Pintu Type P-4 (Kantor) Bh 1.00 - #N/A


Kusen
Bahan Kayu Balok 5/15 - 4 m Btg 1.25 - - - -
Paku 3" Kg 0.02 - - -
Upah Fabrikasi Kusen Kayu M' 5.00 - - 27,511.04 137,555.22
Pasang Kusen M² 1.72 - - 20,977.04 36,080.52
Daun Pintu
Bahan Kayu Papan 4/20 - 4 m Btg 0.79 - - - -
Triplek 4 mm M² 3.04 - - -
Pelat Aluminium M² 1.52 - - -
Upah Fabrikasi Pintu Triplek Bh 1.00 - - #N/A #N/A
Pasang Pintu Bh 1.00 - - 88,553.12 88,553.12
Angkur Kusen
Bahan Besi Beton Polos Ø 10 mm Kg 0.74 - - -
Upah Pembesian Besi Beton Polos Kg 0.74 - - 2,923.11 2,163.10

Pintu Type Dorong (Kantor) Bh 1.00 - #N/A


Kusen
Bahan Kayu Balok 5/15 - 4 m Btg 2.13 - - - -
Paku 3" Kg 0.02 - - -
Upah Fabrikasi Kusen Kayu M' 8.50 - - 27,511.04 233,843.87
Pasang Kusen M² 4.25 - - 20,977.04 89,152.44
Daun Pintu
Bahan Kayu Papan 4/20 - 4 m Btg 1.68 - - - -
Kaca Rayban 5 mm M² 2.37 - - -
Upah Fabrikasi Pintu Panel Bh 2.00 - - #N/A #N/A

108(253) Satuan Pekerjaan


515379445.xls

BAHAN UPAH
NO. JENIS PEKERJAAN SATUAN VOLUME
SATUAN TOTAL SATUAN TOTAL
Pasang Pintu Bh 2.00 - - 88,553.12 177,106.25
Pasang Kaca M² 2.37 - - 13,756.25 32,602.31
Angkur Kusen
Bahan Besi Beton Polos Ø 10 mm Kg 0.74 - - -
Upah Pembesian Besi Beton Polos Kg 0.74 - - 2,923.11 2,163.10

Pintu Jendela Type PJ-1 (Kantor) Bh 1.00 - #N/A


Kusen
Bahan Kayu Balok 5/15 - 4 m Btg 2.06 - - - -
Paku 3" Kg 0.02 - - -
Upah Fabrikasi Kusen Kayu M' 8.25 - - 27,511.04 226,966.11
Pasang Kusen M² 3.12 - - 20,977.04 65,448.38
Daun Pintu
Bahan Kayu Papan 4/20 - 4 m Btg 0.84 - - - -
Triplek 4 mm M² 3.46 - - -
Upah Fabrikasi Pintu Triplek Bh 1.00 - - #N/A #N/A
Pasang Pintu Bh 1.00 - - 88,553.12 88,553.12
Kaca Jendela
Bahan Kaca Bening 5 mm M² 1.08 - - -
Upah Pasang Kaca M² 1.08 - - 13,756.25 14,856.75
Angkur Kusen
Bahan Besi Beton Polos Ø 10 mm Kg 0.49 - - -
Upah Pembesian Besi Beton Polos Kg 0.49 - - 2,923.11 1,432.32

Pintu Jendela Type PJ-2 (Kantor) Bh 1.00 - #N/A


Kusen
Bahan Kayu Balok 5/15 - 4 m Btg 2.06 - - - -
Paku 3" Kg 0.02 - - -
Upah Fabrikasi Kusen Kayu M' 8.25 - - 27,511.04 226,966.11
Pasang Kusen M² 3.12 - - 20,977.04 65,448.38
Daun Pintu
Bahan Kayu Papan 4/20 - 4 m Btg 0.84 - - - -
Triplek 4 mm M² 3.46 - - -

109(253) Satuan Pekerjaan


515379445.xls

BAHAN UPAH
NO. JENIS PEKERJAAN SATUAN VOLUME
SATUAN TOTAL SATUAN TOTAL
Upah Fabrikasi Pintu Triplek Bh 1.00 - - #N/A #N/A
Pasang Pintu Bh 1.00 - - 88,553.12 88,553.12
Kaca Jendela
Bahan Kaca Bening 5 mm M² 1.08 - - -
Upah Pasang Kaca M² 1.08 - - 13,756.25 14,856.75
Angkur Kusen
Bahan Besi Beton Polos Ø 10 mm Kg 0.49 - - -
Upah Pembesian Besi Beton Polos Kg 0.49 - - 2,923.11 1,432.32

Jendela Type J-1 (Kantor) 1.00 - 243,486.37


Kusen
Bahan Kayu Balok 5/15 - 4 m Btg 1.68 - - - -
Paku 3" Kg 0.02 - - -
Upah Fabrikasi Kusen Kayu M' 6.70 - - 27,511.04 184,323.99
Pasang Kusen M² 1.76 - - 20,977.04 36,919.60
Kaca
Bahan Kaca Rayban 5 mm M² 1.51 - - -
Upah Pasang Kaca M² 1.51 - - 13,756.25 20,810.45
Angkur Kusen
Bahan Besi Beton Polos Ø 10 mm Kg 0.49 - - -
Upah Pembesian Besi Beton Polos Kg 0.49 - - 2,923.11 1,432.32

Jendela Type J-2A (Kantor) 1.00 - #N/A


Kusen
Bahan Kayu Balok 5/15 - 4 m Btg 2.24 - - - -
Paku 3" Kg 0.02 - - -
Upah Fabrikasi Kusen Kayu M' 8.95 - - 27,511.04 246,223.84
Pasang Kusen M² 2.23 - - 20,977.04 46,778.81
Kaca
Bahan Kaca Rayban 5 mm M² 0.40 - - -
Upah Pasang Kaca M² 0.40 - - 13,756.25 5,502.50
Daun Jendela
Bahan Kayu Papan 4/20 - 4 m Btg 0.84 - - - -

110(253) Satuan Pekerjaan


515379445.xls

BAHAN UPAH
NO. JENIS PEKERJAAN SATUAN VOLUME
SATUAN TOTAL SATUAN TOTAL
Kaca Rayban 5 mm M² 1.04 - - -
Upah Fabrikasi Jendela Kayu & Kaca Bh 2.00 - - #N/A #N/A
Pasang Kaca M² 1.04 - - 13,756.25 14,306.50
Pasang Jendela Bh 2.00 - - 40,407.71 80,815.42
Angkur Kusen
Bahan Besi Beton Polos Ø 10 mm Kg 0.49 - - -
Upah Pembesian Besi Beton Polos Kg 0.49 - - 2,923.11 1,432.32

Jendela Type J-2B (Kantor) 1.00 - 243,486.37


Kusen
Bahan Kayu Balok 5/15 - 4 m Btg 1.68 - - - -
Paku 3" Kg 0.02 - - -
Upah Fabrikasi Kusen Kayu M' 6.70 - - 27,511.04 184,323.99
Pasang Kusen M² 1.76 - - 20,977.04 36,919.60
Kaca
Bahan Kaca Rayban 5 mm M² 1.51 - - -
Upah Pasang Kaca M² 1.51 - - 13,756.25 20,810.45
Angkur Kusen
Bahan Besi Beton Polos Ø 10 mm Kg 0.49 - - -
Upah Pembesian Besi Beton Polos Kg 0.49 - - 2,923.11 1,432.32

Bovenlight Type BV (Kantor) Bh 1.00 - 82,997.55


Kusen
Bahan Kayu Balok 5/15 - 4 m Btg 0.65 - - - -
Paku 3" Kg 0.02 - - -
Upah Fabrikasi Kusen Kayu M' 2.60 - - 27,511.04 71,528.71
Pasang Kusen M² 0.35 - - 20,977.04 7,341.97
Kaca
Bahan Kaca Buram / Es 5 mm M² 0.30 - - -
Upah Pasang Kaca M² 0.30 - - 13,756.25 4,126.87

Kusen

111(253) Satuan Pekerjaan


515379445.xls

BAHAN UPAH
NO. JENIS PEKERJAAN SATUAN VOLUME
SATUAN TOTAL SATUAN TOTAL
Bahan Kayu Balok 5/15 - 4 m Btg 0.84 - - - -
Kayu Papan 2/20 - 4 m Btg 0.66 - - - -
Paku 3" Kg 0.60 - - -
Upah Fabrikasi Kusen Kayu M' 6.01 - - 27,511.04 165,231.33
Pasang Kusen M² 0.31 - - 20,977.04 6,481.91

Bovenlight Type BV (Kantor) Bh 1.00 - 84,785.81


Kusen
Bahan Kayu Balok 5/15 - 4 m Btg 0.66 - - - -
Paku 3" Kg 0.26 - - -
Upah Fabrikasi Kusen Kayu M' 2.64 - - 27,511.04 72,629.16
Pasang Kusen M² 0.35 - - 20,977.04 7,341.97
Kaca
Bahan Kaca Buram / Es 5 mm M² 0.35 - - -
Upah Pasang Kaca M² 0.35 - - 13,756.25 4,814.69

Jalusi Type JL (Kantor) Bh 1.00 - 548,107.59


Kusen
Bahan Kayu Balok 5/15 - 4 m Btg 2.03 - - - -
Kayu Papan 2/20 - 4 m Btg 2.70 - - - -
Paku 3" Kg 1.89 - - -
Upah Fabrikasi Kusen Kayu M' 18.91 - - 27,511.04 520,266.86
Pasang Kusen M² 1.33 - - 20,977.04 27,840.73

Pintu Type P-1 (Weight Bridge House) Bh 1.00 - #N/A


Kusen
Bahan Kayu Balok 5/15 - 4 m Btg 1.98 - - - -
Paku 3" Kg 0.79 - - -
Upah Fabrikasi Kusen Kayu M' 7.92 - - 27,511.04 217,887.47
Pasang Kusen M² 2.25 - - 20,977.04 47,198.35
Kaca
Bahan Kaca Rayban 5 mm M² 0.27 - - -
Upah Pasang Kaca M² 0.27 - - 13,756.25 3,714.19

112(253) Satuan Pekerjaan


515379445.xls

BAHAN UPAH
NO. JENIS PEKERJAAN SATUAN VOLUME
SATUAN TOTAL SATUAN TOTAL
Daun Pintu
Bahan Kayu Papan 4/20 - 4 m Btg 2.84 - - - -
Upah Fabrikasi Pintu Panel Bh 1.00 - - #N/A #N/A
Pasang Pintu Bh 1.00 - - 88,553.12 88,553.12
Angkur Kusen
Bahan Besi Beton Polos Ø 10 mm Kg 0.74 - - -
Upah Pembesian Besi Beton Polos Kg 0.74 - - 2,923.11 2,163.10

Jendela Type J-1 (Weight Bridge House) 1.00 - 339,006.18


Kusen
Bahan Kayu Balok 5/15 - 4 m Btg 2.48 - - - -
Paku 3" Kg 0.99 - - -
Upah Fabrikasi Kusen Kayu M' 9.90 - - 27,511.04 272,359.34
Pasang Kusen M² 1.96 - - 20,977.04 41,062.56
Kaca
Bahan Kaca Rayban 5 mm M² 0.41 - - -
Upah Pasang Kaca M² 0.41 - - 13,756.25 5,571.28
Kaca
Bahan Kaca Rayban 5 mm M² 1.35 - - -
Upah Pasang Kaca M² 1.35 - - 13,756.25 18,570.93
Angkur Kusen
Bahan Besi Beton Polos Ø 10 mm Kg 0.49 - - -
Upah Pembesian Besi Beton Polos Kg 0.49 - - 2,923.11 1,442.07

Jendela Type J-2 (Weight Bridge House) 1.00 - #N/A


Kusen
Bahan Kayu Balok 5/15 - 4 m Btg 2.48 - - - -
Paku 3" Kg 0.99 - - -
Upah Fabrikasi Kusen Kayu M' 9.90 - - 27,511.04 272,359.34
Pasang Kusen M² 1.96 - - 20,977.04 41,062.56
Kaca
Bahan Kaca Rayban 5 mm M² 0.41 - - -
Upah Pasang Kaca M² 0.41 - - 13,756.25 5,571.28

113(253) Satuan Pekerjaan


515379445.xls

BAHAN UPAH
NO. JENIS PEKERJAAN SATUAN VOLUME
SATUAN TOTAL SATUAN TOTAL
Daun Jendela
Bahan Kayu Papan 4/20 - 4 m Btg 1.76 - - - -
Kaca Rayban 5 mm M² 1.20 - - -
Upah Fabrikasi Jendela Kayu & Kaca Bh 2.00 - - #N/A #N/A
Pasang Kaca M² 1.20 - - 13,756.25 16,507.50
Pasang Jendela Bh 2.00 - - 40,407.71 80,815.42
Angkur Kusen
Bahan Besi Beton Polos Ø 10 mm Kg 0.49 - - -
Upah Pembesian Besi Beton Polos Kg 0.49 - - 2,923.11 1,442.07

Jendela Type J-3 (Weight Bridge House) 1.00 - #N/A


Kusen
Bahan Kayu Balok 5/15 - 4 m Btg - - - -
Paku 3" Kg - - -
Upah Fabrikasi Kusen Kayu M' - - 27,511.04 -
Pasang Kusen M² - - 20,977.04 -
Daun Jendela
Bahan Kayu Papan 4/20 - 4 m Btg - - - -
Kaca Rayban 5 mm M² - - -
Upah Fabrikasi Jendela Kayu & Kaca Bh - - #N/A #N/A
Pasang Kaca M² - - 13,756.25 -
Pasang Jendela Bh - - 40,407.71 -

Pintu Type P-1 (WTP Pump House) Bh 1.00 - #N/A


Kusen
Bahan Kayu Balok 5/15 - 4 m Btg 1.76 - - - -
Paku 3" Kg 0.70 - - -
Upah Fabrikasi Kusen Kayu M' 7.04 - - 27,511.04 193,677.75
Pasang Kusen M² 4.09 - - 20,977.04 85,691.22
Daun Pintu
Bahan Kayu Papan 4/20 - 4 m Btg 6.45 - - - -
Upah Fabrikasi Pintu Panel Bh 2.00 - - #N/A #N/A
Pasang Pintu Bh 2.00 - - 88,553.12 177,106.25

114(253) Satuan Pekerjaan


515379445.xls

BAHAN UPAH
NO. JENIS PEKERJAAN SATUAN VOLUME
SATUAN TOTAL SATUAN TOTAL
Angkur Kusen
Bahan Besi Beton Polos Ø 10 mm Kg 0.74 - - -
Upah Pembesian Besi Beton Polos Kg 0.74 - - 2,923.11 2,163.10

Jendela Type J-1 (WTP Pump House) Bh 1.00 - #N/A


Kusen
Bahan Kayu Balok 5/15 - 4 m Btg 2.64 - - - -
Paku 3" Kg 1.06 - - -
Upah Fabrikasi Kusen Kayu M' 10.56 - - 27,511.04 290,516.62
Pasang Kusen M² 2.60 - - 20,977.04 54,540.31
Daun Jendela
Bahan Kayu Papan 4/20 - 4 m Btg 2.97 - - - -
Kaca Bening 5 mm M² 2.16 - - -
Upah Fabrikasi Jendela Kayu & Kaca Bh 3.00 - - #N/A #N/A
Pasang Kaca M² 2.16 - - 13,756.25 29,713.50
Pasang Jendela Bh 3.00 - - 40,407.71 121,223.12
Angkur Kusen
Bahan Besi Beton Polos Ø 10 mm Kg 0.49 - - -
Upah Pembesian Besi Beton Polos Kg 0.49 - - 2,923.11 1,442.07

Bovenlight Type BV-1 (WTP Pump House) Bh 1.00 - 157,961.86


Kusen
Bahan Kayu Balok 5/15 - 4 m Btg 1.27 - - - -
Paku 3" Kg 0.51 - - -
Upah Fabrikasi Kusen Kayu M' 5.06 - - 27,511.04 139,205.88
Pasang Kusen M² 0.54 - - 20,977.04 11,327.60
Kaca
Bahan Kaca Bening 5 mm M² 0.54 - - -
Upah Pasang Kaca M² 0.54 - - 13,756.25 7,428.37

Bovenlight Type BV-2 (WTP Pump House) Bh 1.00 - 228,411.04


Kusen
Bahan Kayu Balok 5/15 - 4 m Btg 1.76 - - - -

115(253) Satuan Pekerjaan


515379445.xls

BAHAN UPAH
NO. JENIS PEKERJAAN SATUAN VOLUME
SATUAN TOTAL SATUAN TOTAL
Paku 3" Kg 0.70 - - -
Upah Fabrikasi Kusen Kayu M' 7.04 - - 27,511.04 193,677.75
Pasang Kusen M² 1.00 - - 20,977.04 20,977.04
Kaca
Bahan Kaca Bening 5 mm M² 1.00 - - -
Upah Pasang Kaca M² 1.00 - - 13,756.25 13,756.25

Pintu Type P-1 (Musholla) Bh 1.00 - #N/A


Kusen
Bahan Kayu Balok 5/15 - 4 m Btg 2.31 - - - -
Kayu Papan 2/12 - 4 m Btg 0.99 - - - -
Paku 3" Kg 0.33 - - -
Upah Fabrikasi Kusen Kayu M' 13.20 - - 27,511.04 363,145.78
Pasang Kusen M² 3.25 - - 20,977.04 68,175.39
Daun Pintu
Bahan Kayu Papan 4/20 - 4 m Btg 3.25 - - - -
Kaca Bening 5 mm M² 2.56 - - -
Upah Fabrikasi Pintu Panel Bh 2.00 - - #N/A #N/A
Pasang Kaca M² 2.56 - - 13,756.25 35,243.51
Pasang Pintu Bh 2.00 - - 88,553.12 177,106.25
Angkur Kusen
Bahan Besi Beton Polos Ø 10 mm Kg 0.74 - - -
Upah Pembesian Besi Beton Polos Kg 0.74 - - 2,923.11 2,163.10

Jendela Type J-1 (Musholla) Bh 1.00 - #N/A


Kusen
Bahan Kayu Balok 5/15 - 4 m Btg 1.82 - - - -
Kayu Papan 2/12 - 4 m Btg 0.58 - - - -
Paku 3" Kg 0.96 - - -
Upah Fabrikasi Kusen Kayu M' 9.57 - - 27,511.04 263,280.69
Pasang Kusen M² 1.37 - - 20,977.04 28,633.67
Daun Jendela
Bahan Kayu Papan 4/20 - 4 m Btg 1.16 - - - -

116(253) Satuan Pekerjaan


515379445.xls

BAHAN UPAH
NO. JENIS PEKERJAAN SATUAN VOLUME
SATUAN TOTAL SATUAN TOTAL
Kaca Bening 5 mm M² 0.90 - - -
Upah Fabrikasi Jendela Kayu & Kaca Bh 1.00 - - #N/A #N/A
Pasang Kaca M² 0.90 - - 13,756.25 12,380.62
Pasang Jendela Bh 1.00 - - 40,407.71 40,407.71
Angkur Kusen
Bahan Besi Beton Polos Ø 10 mm Kg 0.49 - - -
Upah Pembesian Besi Beton Polos Kg 0.49 - - 2,923.11 1,442.07

Jendela Type J-2 (Musholla) Bh 1.00 - #N/A


Kusen
Bahan Kayu Balok 5/15 - 4 m Btg 3.96 - - - -
Kayu Papan 2/12 - 4 m Btg 1.82 - - - -
Paku 3" Kg 2.31 - - -
Upah Fabrikasi Kusen Kayu M' 23.10 - - 27,511.04 635,505.12
Pasang Kusen M² 4.29 - - 20,977.04 89,991.52
Daun Jendela
Bahan Kayu Papan 4/20 - 4 m Btg 3.47 - - - -
Kaca Bening 5 mm M² 2.70 - - -
Upah Fabrikasi Jendela Kayu & Kaca Bh 3.00 - - #N/A #N/A
Pasang Kaca M² 2.70 - - 13,756.25 37,141.87
Pasang Jendela Bh 3.00 - - 40,407.71 121,223.12
Angkur Kusen
Bahan Besi Beton Polos Ø 10 mm Kg 0.49 - - -
Upah Pembesian Besi Beton Polos Kg 0.49 - - 2,923.11 1,442.07

Pintu Type P-1 (Guard House) Bh 1.00 - #N/A


Kusen
Bahan Kayu Balok 5/15 - 4 m Btg 1.87 - - - -
Kayu Papan 2/12 - 4 m Btg 0.66 - - - -
Paku 3" Kg 1.01 - - -
Upah Fabrikasi Kusen Kayu M' 10.12 - - 27,511.04 278,411.77
Pasang Kusen M² 2.00 - - 20,977.04 41,954.09
Daun Pintu

117(253) Satuan Pekerjaan


515379445.xls

BAHAN UPAH
NO. JENIS PEKERJAAN SATUAN VOLUME
SATUAN TOTAL SATUAN TOTAL
Bahan Kayu Papan 4/20 - 4 m Btg 2.06 - - - -
Triplek 4 mm M² 3.44 - - -
Pelat Aluminium M² 1.72 - - -
Upah Fabrikasi Pintu Triplek Bh 1.00 - - #N/A #N/A
Pasang Pintu Bh 1.00 - - 88,553.12 88,553.12
Angkur Kusen
Bahan Besi Beton Polos Ø 10 mm Kg 0.74 - - -
Upah Pembesian Besi Beton Polos Kg 0.74 - - 2,923.11 2,163.10

Jendela Type J-1 (Guard House) Bh 1.00 - #N/A


Kusen
Bahan Kayu Balok 5/15 - 4 m Btg 1.54 - - - -
Kayu Papan 2/12 - 4 m Btg 0.58 - - - -
Paku 3" Kg 0.85 - - -
Upah Fabrikasi Kusen Kayu M' 8.47 - - 27,511.04 233,018.54
Pasang Kusen M² 1.02 - - 20,977.04 21,291.70
Daun Jendela
Bahan Kayu Papan 4/20 - 4 m Btg 0.88 - - - -
Kaca Bening 5 mm M² 0.70 - - -
Upah Fabrikasi Jendela Kayu & Kaca Bh 1.00 - - #N/A #N/A
Pasang Kaca M² 0.70 - - 13,756.25 9,629.37
Pasang Jendela Bh 1.00 - - 40,407.71 40,407.71
Angkur Kusen
Bahan Besi Beton Polos Ø 10 mm Kg 0.49 - - -
Upah Pembesian Besi Beton Polos Kg 0.49 - - 2,923.11 1,442.07

Bovenlight Type BV (Guard House) Bh 1.00 - 94,459.34


Kusen
Bahan Kayu Balok 5/15 - 4 m Btg 0.77 - - - -
Paku 3" Kg 0.31 - - -
Upah Fabrikasi Kusen Kayu M' 3.08 - - 27,511.04 84,734.02
Pasang Kusen M² 0.28 - - 20,977.04 5,873.57
Kaca

118(253) Satuan Pekerjaan


515379445.xls

BAHAN UPAH
NO. JENIS PEKERJAAN SATUAN VOLUME
SATUAN TOTAL SATUAN TOTAL
Bahan Kaca Buram / Es 5 mm M² 0.28 - - -
Upah Pasang Kaca M² 0.28 - - 13,756.25 3,851.75

Pintu Type P-1 (Pos Sortasi) Bh 1.00 - #N/A


Kusen
Bahan Kayu Balok 5/15 - 4 m Btg 1.70 - - - -
Paku 3" Kg 0.02 - - -
Upah Fabrikasi Kusen Kayu M' 6.80 - - 27,511.04 187,075.10
Pasang Kusen M² 2.50 - - 20,977.04 52,442.61
Daun Pintu
Bahan Kayu Papan 4/20 - 4 m Btg 2.40 - - - -
Upah Fabrikasi Pintu Panel Bh 1.00 - - #N/A #N/A
Pasang Pintu Bh 1.00 - - 88,553.12 88,553.12
Angkur Kusen
Bahan Besi Beton Polos Ø 10 mm Kg 0.74 - - -
Upah Pembesian Besi Beton Polos Kg 0.74 - - 2,923.11 2,163.10

Pintu Type P-2 (Pos Sortasi) Bh 1.00 - #N/A


Kusen
Bahan Kayu Balok 5/15 - 4 m Btg 1.60 - - - -
Kayu Papan 2/12 - 4 m Btg 0.47 - - - -
Paku 3" Kg 0.02 - - -
Upah Fabrikasi Kusen Kayu M' 6.40 - - 27,511.04 176,070.68
Pasang Kusen M² 2.00 - - 20,977.04 41,954.09
Daun Pintu
Bahan Kayu Papan 4/20 - 4 m Btg 0.79 - - - -
Triplek 4 mm M² 3.02 - - -
Pelat Aluminium M² 1.51 - - -
Upah Fabrikasi Pintu Triplek Bh 1.00 - - #N/A #N/A
Pasang Pintu Bh 1.00 - - 88,553.12 88,553.12
Angkur Kusen
Bahan Besi Beton Polos Ø 10 mm Kg 0.74 - - -
Upah Pembesian Besi Beton Polos Kg 0.74 - - 2,923.11 2,163.10

119(253) Satuan Pekerjaan


515379445.xls

BAHAN UPAH
NO. JENIS PEKERJAAN SATUAN VOLUME
SATUAN TOTAL SATUAN TOTAL

Bovenlight Type BV (Pos Sortasi) Bh 1.00 - 82,997.55


Kusen
Bahan Kayu Balok 5/15 - 4 m Btg 0.65 - - - -
Paku 3" Kg 0.02 - - -
Upah Fabrikasi Kusen Kayu M' 2.60 - - 27,511.04 71,528.71
Pasang Kusen M² 0.35 - - 20,977.04 7,341.97
Kaca
Bahan Kaca Buram / Es 5 mm M² 0.30 - - -
Upah Pasang Kaca M² 0.30 - - 13,756.25 4,126.87

Pintu Type P-1 (Toilet Block) Bh 1.00 - #N/A


Kusen
Bahan Kayu Balok 5/15 - 4 m Btg 1.87 - - - -
Kayu Papan 2/12 - 4 m Btg 0.88 - - - -
Paku 3" Kg 1.10 - - -
Upah Fabrikasi Kusen Kayu M' 11.00 - - 27,511.04 302,621.48
Pasang Kusen M² 2.08 - - 20,977.04 43,632.25
Daun Pintu
Bahan Kayu Papan 4/20 - 4 m Btg 1.93 - - - -
Triplek 4 mm M² 3.36 - - -
Pelat Aluminium M² 1.68 - - -
Upah Fabrikasi Pintu Triplek Bh 1.00 - - #N/A #N/A
Pasang Pintu Bh 1.00 - - 88,553.12 88,553.12
Angkur Kusen
Bahan Besi Beton Polos Ø 10 mm Kg 0.74 - - -
Upah Pembesian Besi Beton Polos Kg 0.74 - - 2,923.11 2,163.10

Bovenlight Type BV (Toilet Block) Bh 1.00 - 94,459.34


Kusen
Bahan Kayu Balok 5/15 - 4 m Btg 0.77 - - - -
Paku 3" Kg 0.31 - - -
Upah Fabrikasi Kusen Kayu M' 3.08 - - 27,511.04 84,734.02

120(253) Satuan Pekerjaan


515379445.xls

BAHAN UPAH
NO. JENIS PEKERJAAN SATUAN VOLUME
SATUAN TOTAL SATUAN TOTAL
Pasang Kusen M² 0.28 - - 20,977.04 5,873.57
Kaca
Bahan Kaca Buram / Es 5 mm M² 0.28 - - -
Upah Pasang Kaca M² 0.28 - - 13,756.25 3,851.75

Pintu Type P-1 (Reservoir Pump House) Bh 1.00 - #N/A


Kusen
Bahan Kayu Balok 5/15 - 4 m Btg 1.71 - - - -
Paku 3" Kg 0.68 - - -
Upah Fabrikasi Kusen Kayu M' 6.82 - - 27,511.04 187,625.32
Pasang Kusen M² 3.66 - - 20,977.04 76,671.10
Daun Pintu
Bahan Kayu Papan 4/20 - 4 m Btg 4.13 - - - -
Triplek 4 mm M² 3.44 - - -
Upah Fabrikasi Pintu Triplek Bh 2.00 - - #N/A #N/A
Pasang Pintu Bh 2.00 - - 88,553.12 177,106.25
Angkur Kusen
Bahan Besi Beton Polos Ø 10 mm Kg 0.74 - - -
Upah Pembesian Besi Beton Polos Kg 0.74 - - 2,923.11 2,163.10

Jendela Type J-1 (Reservoir Pump House) Bh 1.00 - #N/A


Kusen
Bahan Kayu Balok 5/15 - 4 m Btg 1.74 - - - -
Paku 3" Kg 0.69 - - -
Upah Fabrikasi Kusen Kayu M' 6.94 - - 27,511.04 190,954.16
Pasang Kusen M² 1.44 - - 20,977.04 30,301.34
Daun Jendela
Bahan Kayu Papan 4/20 - 4 m Btg 1.84 - - - -
Kaca Bening 5 mm M² 1.28 - - -
Upah Fabrikasi Jendela Kayu & Kaca Bh 2.00 - - #N/A #N/A
Pasang Kaca M² 1.28 - - 13,756.25 17,663.02
Pasang Jendela Bh 1.28 - - 40,407.71 51,883.50
Angkur Kusen

121(253) Satuan Pekerjaan


515379445.xls

BAHAN UPAH
NO. JENIS PEKERJAAN SATUAN VOLUME
SATUAN TOTAL SATUAN TOTAL
Bahan Besi Beton Polos Ø 10 mm Kg 0.49 - - -
Upah Pembesian Besi Beton Polos Kg 0.49 - - 2,923.11 1,442.07

Pintu Type P-1 (Rumah Panel Water Intake) Bh 1.00 - #N/A


Kusen
Bahan Kayu Balok 5/15 - 4 m Btg - - - -
Paku 3" Kg - - -
Upah Fabrikasi Kusen Kayu M' - - 27,511.04 -
Pasang Kusen M² - - 20,977.04 -
Daun Pintu
Bahan Kayu Papan 4/20 - 4 m Btg - - - -
Triplek 4 mm M² - - -
Upah Fabrikasi Pintu Triplek Bh - - #N/A #N/A
Pasang Pintu Bh - - 88,553.12 -
Angkur Kusen
Bahan Besi Beton Polos Ø 10 mm Kg - - -
Upah Pembesian Besi Beton Polos Kg - - 2,923.11 -

Jendela Type J-1 (Rumah Panel Water Intake) Bh 1.00 - #N/A


Kusen
Bahan Kayu Balok 5/15 - 4 m Btg - - - -
Paku 3" Kg - - -
Upah Fabrikasi Kusen Kayu M' - - 27,511.04 -
Pasang Kusen M² - - 20,977.04 -
Daun Jendela
Bahan Kayu Papan 4/20 - 4 m Btg - - - -
Kaca Bening 5 mm M² - - -
Upah Fabrikasi Jendela Kayu & Kaca Bh - - #N/A #N/A
Pasang Kaca M² - - 13,756.25 -
Pasang Jendela Bh - - 40,407.71 -
Angkur Kusen
Bahan Besi Beton Polos Ø 10 mm Kg - - -
Upah Pembesian Besi Beton Polos Kg - - 2,923.11 -

122(253) Satuan Pekerjaan


515379445.xls

BAHAN UPAH
NO. JENIS PEKERJAAN SATUAN VOLUME
SATUAN TOTAL SATUAN TOTAL

Pintu Type P-1 (Effluent Pump House) Bh 1.00 - #N/A


Kusen
Bahan Kayu Balok 5/15 - 4 m Btg 1.71 - - - -
Paku 3" Kg 0.68 - - -
Upah Fabrikasi Kusen Kayu M' 6.82 - - 27,511.04 187,625.32
Pasang Kusen M² 3.66 - - 20,977.04 76,671.10
Daun Pintu
Bahan Kayu Papan 4/20 - 4 m Btg 4.13 - - - -
Triplek 4 mm M² 6.88 - - -
Upah Fabrikasi Pintu Triplek Bh 2.00 - - #N/A #N/A
Pasang Pintu Bh 2.00 - - 88,553.12 177,106.25
Angkur Kusen
Bahan Besi Beton Polos Ø 10 mm Kg 0.74 - - -
Upah Pembesian Besi Beton Polos Kg 0.74 - - 2,923.11 2,163.10

Jendela Type J-1 (Effluent Pump House) Bh 1.00 - #N/A


Kusen
Bahan Kayu Balok 5/15 - 4 m Btg 1.74 - - - -
Paku 3" Kg 0.69 - - -
Upah Fabrikasi Kusen Kayu M' 6.94 - - 27,511.04 190,954.16
Pasang Kusen M² 1.44 - - 20,977.04 30,301.34
Daun Jendela
Bahan Kayu Papan 4/20 - 4 m Btg 1.84 - - - -
Kaca Bening 5 mm M² 1.28 - - -
Upah Fabrikasi Jendela Kayu & Kaca Bh 2.00 - - #N/A #N/A
Pasang Kaca M² 1.28 - - 13,756.25 17,663.02
Pasang Jendela Bh 2.00 - - 40,407.71 80,815.42
Angkur Kusen
Bahan Besi Beton Polos Ø 10 mm Kg 0.49 - - -
Upah Pembesian Besi Beton Polos Kg 0.49 - - 2,923.11 1,442.07

Pintu Jendela Type PJ-1 (Control Room) Bh 1.00 - #N/A

123(253) Satuan Pekerjaan


515379445.xls

BAHAN UPAH
NO. JENIS PEKERJAAN SATUAN VOLUME
SATUAN TOTAL SATUAN TOTAL
Kusen
Bahan Kayu Balok 5/15 - 4 m Btg 2.68 - - - -
Paku 3" Kg 1.07 - - -
Upah Fabrikasi Kusen Kayu M' 10.70 - - 27,511.04 294,368.17
Pasang Kusen M² 3.86 - - 20,977.04 80,971.39
Daun Pintu
Bahan Kayu Papan 4/20 - 4 m Btg 0.84 - - - -
Triplek 4 mm M² 3.46 - - -
Upah Fabrikasi Pintu Triplek Bh 1.00 - - #N/A #N/A
Pasang Pintu Bh 1.00 - - 88,553.12 88,553.12
Kaca Jendela
Bahan Kaca Bening 5 mm M² 1.72 - - -
Upah Pasang Kaca M² 1.72 - - 13,756.25 23,726.78
Angkur Kusen
Bahan Besi Beton Polos Ø 10 mm Kg 0.49 - - -
Upah Pembesian Besi Beton Polos Kg 0.49 - - 2,923.11 1,432.32

Jendela Type J-1 (Control Room) Bh 1.00 - 176,890.17


Kusen
Bahan Kayu Balok 5/15 - 4 m Btg 1.20 - - - -
Paku 3" Kg 0.48 - - -
Upah Fabrikasi Kusen Kayu M' 4.80 - - 27,511.04 132,053.01
Pasang Kusen M² 1.32 - - 20,977.04 27,689.70
Kaca
Bahan Kaca Bening 5 mm M² 1.14 - - -
Upah Pasang Kaca M² 1.14 - - 13,756.25 15,715.14
Angkur Kusen
Bahan Besi Beton Polos Ø 10 mm Kg 0.49 - - -
Upah Pembesian Besi Beton Polos Kg 0.49 - - 2,923.11 1,432.32

Jendela Type J-2 (Control Room) Bh 1.00 - 307,071.72


Kusen
Bahan Kayu Balok 5/15 - 4 m Btg 2.00 - - - -

124(253) Satuan Pekerjaan


515379445.xls

BAHAN UPAH
NO. JENIS PEKERJAAN SATUAN VOLUME
SATUAN TOTAL SATUAN TOTAL
Paku 3" Kg 0.80 - - -
Upah Fabrikasi Kusen Kayu M' 8.00 - - 27,511.04 220,088.35
Pasang Kusen M² 2.58 - - 20,977.04 54,120.77
Kaca
Bahan Kaca Bening 5 mm M² 2.28 - - -
Upah Pasang Kaca M² 2.28 - - 13,756.25 31,430.28
Angkur Kusen
Bahan Besi Beton Polos Ø 10 mm Kg 0.49 - - -
Upah Pembesian Besi Beton Polos Kg 0.49 - - 2,923.11 1,432.32

Jendela Type J-3 (Control Room) Bh 1.00 - 420,270.12


Kusen
Bahan Kayu Balok 5/15 - 4 m Btg 2.80 - - - -
Paku 3" Kg 1.12 - - -
Upah Fabrikasi Kusen Kayu M' 11.20 - - 27,511.04 308,123.69
Pasang Kusen M² 3.03 - - 20,977.04 63,560.44
Kaca
Bahan Kaca Bening 5 mm M² 3.43 - - -
Upah Pasang Kaca M² 3.43 - - 13,756.25 47,153.67
Angkur Kusen
Bahan Besi Beton Polos Ø 10 mm Kg 0.49 - - -
Upah Pembesian Besi Beton Polos Kg 0.49 - - 2,923.11 1,432.32

Pintu Type P-4 (Workshop) Bh 1.00 - #N/A


Kusen
Bahan Kayu Balok 5/15 - 4 m Btg 2.04 - - - -
Paku 3" Kg 0.81 - - -
Upah Fabrikasi Kusen Kayu M' 8.14 - - 27,511.04 223,939.90
Pasang Kusen M² 2.50 - - 20,977.04 52,442.61
Jalusi Besi
Bahan Besi Beton Polos Ø 8 mm Kg 1.90 - - -
Upah Pembesian Besi Beton Polos Kg 1.90 - - 2,923.11 5,542.21
Daun Pintu

125(253) Satuan Pekerjaan


515379445.xls

BAHAN UPAH
NO. JENIS PEKERJAAN SATUAN VOLUME
SATUAN TOTAL SATUAN TOTAL
Bahan Kayu Papan 4/20 - 4 m Btg 2.60 - - - -
Upah Fabrikasi Pintu Panel Bh 1.00 - - #N/A #N/A
Pasang Pintu Bh 1.00 - - 88,553.12 88,553.12
Angkur Kusen
Bahan Besi Beton Polos Ø 10 mm Kg 0.47 - - -
Upah Pembesian Besi Beton Polos Kg 0.47 - - 2,923.11 1,385.55

Pintu Type P-5 (Workshop) Bh 1.00 - #N/A


Kusen
Bahan Kayu Balok 5/15 - 4 m Btg 2.09 - - - -
Paku 3" Kg 0.84 - - -
Upah Fabrikasi Kusen Kayu M' 8.36 - - 27,511.04 229,992.33
Pasang Kusen M² 4.75 - - 20,977.04 99,640.96
Jalusi Besi
Bahan Besi Beton Polos Ø 8 mm Kg 3.79 - - -
Upah Pembesian Besi Beton Polos Kg 3.79 - - 2,923.11 11,084.42
Daun Pintu
Bahan Kayu Papan 4/20 - 4 m Btg 5.20 - - - -
Upah Fabrikasi Pintu Panel Bh 2.00 - - #N/A #N/A
Pasang Pintu Bh 2.00 - - 88,553.12 177,106.25
Angkur Kusen
Bahan Besi Beton Polos Ø 10 mm Kg 0.47 - - -
Upah Pembesian Besi Beton Polos Kg 0.47 - - 2,923.11 1,385.55

Pintu Type P-6 (Workshop) Bh 1.00 - #N/A


Kusen
Bahan Kayu Balok 5/15 - 4 m Btg 2.09 - - - -
Paku 3" Kg 0.84 - - -
Upah Fabrikasi Kusen Kayu M' 8.36 - - 27,511.04 229,992.33
Pasang Kusen M² 4.75 - - 20,977.04 99,640.96
Daun Pintu
Bahan Kayu Papan 4/20 - 4 m Btg 5.20 - - - -
Upah Fabrikasi Pintu Panel Bh 2.00 - - #N/A #N/A

126(253) Satuan Pekerjaan


515379445.xls

BAHAN UPAH
NO. JENIS PEKERJAAN SATUAN VOLUME
SATUAN TOTAL SATUAN TOTAL
Pasang Pintu Bh 2.00 - - 88,553.12 177,106.25
Angkur Kusen
Bahan Besi Beton Polos Ø 10 mm Kg 0.47 - - -
Upah Pembesian Besi Beton Polos Kg 0.47 - - 2,923.11 1,385.55

Pintu Type P-7 (Workshop) Bh 1.00 - #N/A


Kusen
Bahan Kayu Balok 5/15 - 4 m Btg 1.93 - - - -
Paku 3" Kg 0.77 - - -
Upah Fabrikasi Kusen Kayu M' 7.70 - - 27,511.04 211,835.04
Pasang Kusen M² 2.00 - - 20,977.04 41,954.09
Daun Pintu
Bahan Kayu Papan 4/20 - 4 m Btg 1.82 - - - -
Triplek 4 mm M² 2.94 - - -
Pelat Aluminium M² 1.47 - - -
Upah Fabrikasi Pintu Triplek Bh 1.00 - - #N/A #N/A
Pasang Pintu Bh 1.00 - - 88,553.12 88,553.12
Angkur Kusen
Bahan Besi Beton Polos Ø 10 mm Kg 0.47 - - -
Upah Pembesian Besi Beton Polos Kg 0.47 - - 2,923.11 1,385.55

Pintu Jendela Type PJ-1 (Workshop) Bh 1.00 - #N/A


Kusen
Bahan Kayu Balok 5/15 - 4 m Btg 4.06 - - - -
Paku 3" Kg 1.62 - - -
Upah Fabrikasi Kusen Kayu M' 16.23 - - 27,511.04 446,366.69
Pasang Kusen M² 4.61 - - 20,977.04 96,704.17
Jalusi Besi
Bahan Besi Beton Polos Ø 8 mm Kg 4.42 - - -
Upah Pembesian Besi Beton Polos Kg 4.42 - - 2,923.11 12,931.82
Daun Pintu
Bahan Kayu Papan 4/20 - 4 m Btg 2.60 - - - -
Upah Fabrikasi Pintu Panel Bh 1.00 - - #N/A #N/A

127(253) Satuan Pekerjaan


515379445.xls

BAHAN UPAH
NO. JENIS PEKERJAAN SATUAN VOLUME
SATUAN TOTAL SATUAN TOTAL
Pasang Pintu Bh 1.00 - - 88,553.12 88,553.12
Daun Jendela
Bahan Kayu Papan 4/20 - 4 m Btg 1.98 - - - -
Kaca Rayban 5 mm M² 1.44 - - -
Upah Fabrikasi Jendela Kayu & Kaca Bh 2.00 - - #N/A #N/A
Pasang Kaca M² 1.44 - - 13,756.25 19,809.00
Pasang Jendela Bh 2.00 - - 40,407.71 80,815.42
Angkur Kusen
Bahan Besi Beton Polos Ø 10 mm Kg 0.47 - - -
Upah Pembesian Besi Beton Polos Kg 0.47 - - 2,923.11 1,385.55

Pintu Jendela Type PJ-2 (Workshop) Bh 1.00 - #N/A


Kusen
Bahan Kayu Balok 5/15 - 4 m Btg 4.06 - - - -
Paku 3" Kg 1.62 - - -
Upah Fabrikasi Kusen Kayu M' 16.23 - - 27,511.04 446,366.69
Pasang Kusen M² 4.61 - - 20,977.04 96,704.17
Kaca
Bahan Kaca Rayban 5 mm M² 0.90 - - -
Upah Pasang Kaca M² 0.90 - - 13,756.25 12,380.62
Daun Pintu
Bahan Kayu Papan 4/20 - 4 m Btg 2.60 - - - -
Upah Fabrikasi Pintu Panel Bh 1.00 - - #N/A #N/A
Pasang Pintu Bh 1.00 - - 88,553.12 88,553.12
Daun Jendela
Bahan Kayu Papan 4/20 - 4 m Btg 1.98 - - - -
Kaca Rayban 5 mm M² 1.44 - - -
Upah Fabrikasi Jendela Kayu & Kaca Bh 2.00 - - #N/A #N/A
Pasang Kaca M² 1.44 - - 13,756.25 19,809.00
Pasang Jendela Bh 2.00 - - 40,407.71 80,815.42
Angkur Kusen
Bahan Besi Beton Polos Ø 10 mm Kg 0.47 - - -
Upah Pembesian Besi Beton Polos Kg 0.47 - - 2,923.11 1,385.55

128(253) Satuan Pekerjaan


515379445.xls

BAHAN UPAH
NO. JENIS PEKERJAAN SATUAN VOLUME
SATUAN TOTAL SATUAN TOTAL

Jendela Type J-1 (Workshop) Bh 1.00 - #N/A


Kusen
Bahan Kayu Balok 5/15 - 4 m Btg 2.64 - - - -
Paku 3" Kg 1.06 - - -
Upah Fabrikasi Kusen Kayu M' 10.56 - - 27,511.04 290,516.62
Pasang Kusen M² 2.23 - - 20,977.04 46,726.37
Jalusi Besi
Bahan Besi Beton Polos Ø 8 mm Kg 2.53 - - -
Upah Pembesian Besi Beton Polos Kg 2.53 - - 2,923.11 7,389.61
Daun Jendela
Bahan Kayu Papan 4/20 - 4 m Btg 1.98 - - - -
Kaca Rayban 5 mm M² 1.44 - - -
Upah Fabrikasi Jendela Kayu & Kaca Bh 2.00 - - #N/A #N/A
Pasang Kaca M² 1.44 - - 13,756.25 19,809.00
Pasang Jendela Bh 2.00 - - 40,407.71 80,815.42
Angkur Kusen
Bahan Besi Beton Polos Ø 10 mm Kg 0.32 - - -
Upah Pembesian Besi Beton Polos Kg 0.32 - - 2,923.11 923.70

Jendela Type J-2 (Workshop) Bh 1.00 - #N/A


Kusen
Bahan Kayu Balok 5/15 - 4 m Btg 2.64 - - - -
Paku 3" Kg 1.06 - - -
Upah Fabrikasi Kusen Kayu M' 10.56 - - 27,511.04 290,516.62
Pasang Kusen M² 2.23 - - 20,977.04 46,726.37
Kaca
Bahan Kaca Rayban 5 mm M² 0.54 - - -
Upah Pasang Kaca M² 0.54 - - 13,756.25 7,428.37
Daun Jendela
Bahan Kayu Papan 4/20 - 4 m Btg 1.98 - - - -
Kaca Rayban 5 mm M² 1.44 - - -
Upah Fabrikasi Jendela Kayu & Kaca Bh 2.00 - - #N/A #N/A

129(253) Satuan Pekerjaan


515379445.xls

BAHAN UPAH
NO. JENIS PEKERJAAN SATUAN VOLUME
SATUAN TOTAL SATUAN TOTAL
Pasang Kaca M² 1.44 - - 13,756.25 19,809.00
Pasang Jendela Bh 2.00 - - 40,407.71 80,815.42
Angkur Kusen
Bahan Besi Beton Polos Ø 10 mm Kg 0.32 - - -
Upah Pembesian Besi Beton Polos Kg 0.32 - - 2,923.11 923.70

Bovenlight Type BV-1 (Workshop) Bh 1.00 - 88,249.96


Kusen
Bahan Kayu Balok 5/15 - 4 m Btg 0.72 - - - -
Paku 3" Kg 0.29 - - -
Upah Fabrikasi Kusen Kayu M' 2.86 - - 27,511.04 78,681.59
Pasang Kusen M² 0.28 - - 20,977.04 5,873.57
Jalusi Besi
Bahan Besi Beton Polos Ø 8 mm Kg 1.26 - - -
Upah Pembesian Besi Beton Polos Kg 1.26 - - 2,923.11 3,694.81

Bovenlight Type BV-2 (Workshop) Bh 1.00 - 148,844.45


Kusen
Bahan Kayu Balok 5/15 - 4 m Btg 1.18 - - - -
Paku 3" Kg 0.47 - - -
Upah Fabrikasi Kusen Kayu M' 4.73 - - 27,511.04 130,127.24
Pasang Kusen M² 0.54 - - 20,977.04 11,327.60
Jalusi Besi
Bahan Besi Beton Polos Ø 8 mm Kg 2.53 - - -
Upah Pembesian Besi Beton Polos Kg 2.53 - - 2,923.11 7,389.61

Teralis Jendela (Kantor) Bh 1.00 - 19,234.77


Bahan MS - PELAT STRIP 3 X 25 MM Kg 2.33 - - -
Besi Beton Polos Ø 8 mm Kg 3.63 - - -
Upah Fabrikasi / Ereksi Pelat Baja Kg 2.33 - - 3,701.50 8,623.75
Pembesian Besi Beton Polos Kg 3.63 - - 2,923.11 10,611.02

Teralis Jendela (Workshop) Bh 1.00 - 19,234.77

130(253) Satuan Pekerjaan


515379445.xls

BAHAN UPAH
NO. JENIS PEKERJAAN SATUAN VOLUME
SATUAN TOTAL SATUAN TOTAL
Bahan MS - PELAT STRIP 3 X 25 MM Kg 2.33 - - -
Besi Beton Polos Ø 8 mm Kg 3.63 - - -
Upah Fabrikasi / Ereksi Pelat Baja Kg 2.33 - - 3,701.50 8,623.75
Pembesian Besi Beton Polos Kg 3.63 - - 2,923.11 10,611.02

Teralis Jendela (Weight Bridge House) Bh 1.00 - 17,445.25


Bahan MS - PELAT STRIP 3 X 19 MM Kg 2.07 - - -
Besi Beton Polos Ø 8 mm Kg 3.35 - - -
Upah Fabrikasi / Ereksi Pelat Baja Kg 2.07 - - 3,701.50 7,665.56
Pembesian Besi Beton Polos Kg 3.35 - - 2,923.11 9,779.69

Teralis Pintu (Reservoir Pump house) Bh 1.00 - 204,562.51


Bahan MS - L 40X40X4 Kg 30.88 - - -
Besi Beton Polos Ø 8 mm Kg 16.95 - - -
Upah Fabrikasi / Ereksi Profil Baja L Kg 30.88 - - 3,701.50 114,299.36
Pembesian Besi Beton Polos Kg 30.88 - - 2,923.11 90,263.15

Teralis Jendela (Reservoir Pump House) Bh 1.00 - 13,461.88


Bahan MS - PELAT STRIP 3 X 25 MM Kg 2.03 - - -
Besi Beton Polos Ø 8 mm Kg 3.26 - - -
Upah Fabrikasi / Ereksi Pelat Baja Kg 2.03 - - 3,701.50 7,521.83
Pembesian Besi Beton Polos Kg 2.03 - - 2,923.11 5,940.05

Teralis Pintu (Rumah Panel Water Intake) Bh 1.00 - -


Bahan MS - L 40X40X4 Kg - - -
Besi Beton Polos Ø 8 mm Kg - - -
Upah Fabrikasi / Ereksi Profil Baja L Kg - - 3,701.50 -
Pembesian Besi Beton Polos Kg - - 2,923.11 -

Teralis Jendela (Rumah Panel Water Intake) Bh 1.00 - -


Bahan MS - PELAT STRIP 3 X 25 MM Kg - - -
Besi Beton Polos Ø 8 mm Kg - - -
Upah Fabrikasi / Ereksi Pelat Baja Kg - - 3,701.50 -

131(253) Satuan Pekerjaan


515379445.xls

BAHAN UPAH
NO. JENIS PEKERJAAN SATUAN VOLUME
SATUAN TOTAL SATUAN TOTAL
Pembesian Besi Beton Polos Kg - - 2,923.11 -

Teralis Pintu (Effluent Pump house) Bh 1.00 - 163,832.84


Bahan MS - L 40X40X4 Kg 30.88 - - -
Besi Beton Polos Ø 8 mm Kg 16.95 - - -
Upah Fabrikasi / Ereksi Profil Baja L Kg 30.88 - - 3,701.50 114,299.36
Pembesian Besi Beton Polos Kg 16.95 - - 2,923.11 49,533.48

Teralis Jendela (Effluent Pump House) Bh 1.00 - 17,047.50


Bahan MS - PELAT STRIP 3 X 25 MM Kg 2.03 - - -
Besi Beton Polos Ø 8 mm Kg 3.26 - - -
Upah Fabrikasi / Ereksi Pelat Baja Kg 2.03 - - 3,701.50 7,521.83
Pembesian Besi Beton Polos Kg 3.26 - - 2,923.11 9,525.67

Kunci Tanam 2 slot Bh 1.00 - 24,072.64


Bahan Kunci Tanam 2 slot Bh 1.00 - - -
Upah Pasang Kunci Tanam Bh 1.00 - - 24,072.64 24,072.64

Kunci Pintu Toilet Bh 1.00 - 24,098.84


Bahan Kunci Pintu Toilet Bh 1.00 - - -
Upah Pasang Kunci Pintu Toilet Bh 1.00 - - 24,098.84 24,098.84

Engsel 4" Bh 1.00 - 8,081.83


Bahan Engsel 4" Bh 1.00 - - -
Upah Pasang Engsel Bh 1.00 - - 8,081.83 8,081.83

Engsel 3" Bh 1.00 - 8,081.83


Bahan Engsel 3" Bh 1.00 - - -
Upah Pasang Engsel Bh 1.00 - - 8,081.83 8,081.83

Grendel Tanam 8" Bh 1.00 - 8,081.83


Bahan Grendel Tanam 8" Bh 1.00 - - -
Upah Pasang Grendel Bh 1.00 - - 8,081.83 8,081.83

132(253) Satuan Pekerjaan


515379445.xls

BAHAN UPAH
NO. JENIS PEKERJAAN SATUAN VOLUME
SATUAN TOTAL SATUAN TOTAL

Grendel 6" Bh 1.00 - 8,081.83


Bahan Grendel 6" Bh 1.00 - - -
Upah Pasang Grendel Bh 1.00 - - 8,081.83 8,081.83

Pasang Kaca m2 1.00 - 13,756.25


Bahan Kaca Rayban 5 mm m2 1.00 - - -
Upah Pasang Kaca m2 1.00 - - 13,756.25 13,756.25

Handel Pintu Kupu-Kupu Bh 1.00 - 24,072.64


Bahan Handel 2 Pintu Bh 1.00 - - -
Kunci Tanam 2 slot Bh 1.00 - - -
Upah Pasang Kunci Tanam Bh 1.00 - - 24,072.64 24,072.64

Grendel 3" Bh 1.00 - 8,081.83


Bahan Grendel 3" Bh 1.00 - - -
Upah Pasang Grendel Bh 1.00 - - 8,081.83 8,081.83

Grendel 2" Bh 1.00 - 8,081.83


Bahan Grendel 2" Bh 1.00 - - -
Upah Pasang Grendel Bh 1.00 - - 8,081.83 8,081.83

Pegangan Pintu 4" Bh 1.00 - 8,081.83


Bahan Pegangan Pintu 4" Bh 1.00 - - -
Upah Pasang Pegangan Jendela Bh 1.00 - - 8,081.83 8,081.83

Pegangan Jendela 3" Bh 1.00 - 8,081.83


Bahan Pegangan Jendela 3" Bh 1.00 - - -
Upah Pasang Pegangan Jendela Bh 1.00 - - 8,081.83 8,081.83

Hak Angin Bh 1.00 - 8,081.83


Bahan Hak Angin Bh 1.00 - - -
Upah Pasang Hak Angin Bh 1.00 - - 8,081.83 8,081.83

133(253) Satuan Pekerjaan


515379445.xls

BAHAN UPAH
NO. JENIS PEKERJAAN SATUAN VOLUME
SATUAN TOTAL SATUAN TOTAL

Engsel Pintu Ø 19 Bh 1.00 - 16,163.66


Bahan Engsel Pintu Ø 19 Bh 1.00 - - -
Upah Pasang Engsel Pintu Ø 19 Bh 1.00 - - 16,163.66 16,163.66

Grendel Tanam Ø 16 mm Bh 1.00 - 24,072.71


Bahan Grendel Tanam Ø 16 mm Bh 1.00 - - -
Upah Pasang Grendel Tanam Ø 16 mm Bh 1.00 - - 24,072.71 24,072.71

Roller Pintu Ø 60 mm Bh 1.00 - 40,407.71


Bahan Roller Pintu Ø 60 mm Bh 1.00 - - -
Upah Pasang Roller Pintu Ø 60 mm Bh 1.00 - - 40,407.71 40,407.71

Roda Pintu Ø 80 mm Bh 1.00 - 56,398.58


Bahan Roda Pintu Ø 80 mm Bh 1.00 - - -
Upah Pasang Roda Pintu Bh 1.00 - - 56,398.58 56,398.58

Roda Pintu Ø 100 mm Bh 1.00 - 56,398.58


Bahan Roda Pintu Ø 100 mm Bh 1.00 - - -
Upah Pasang Roda Pintu Bh 1.00 - - 56,398.58 56,398.58

Roda Pintu Ø 200 mm Bh 1.00 - 56,398.58


Bahan Roda Pintu Ø 200 mm Bh 1.00 - - -
Upah Pasang Roda Pintu Bh 1.00 - - 56,398.58 56,398.58

Gantungan Pintu Bh 1.00 - 56,398.58


Bahan Bh 1.00 - - - -
Upah Pasang Gantungan Pintu Bh 1.00 - - 56,398.58 56,398.58

Bearing Sliding Door Bh 1.00 - #N/A


Bahan Bearing Sliding Door Bh 1.00 - - -
Upah Pasang Bearing Sliding Door Bh 1.00 - - #N/A #N/A

134(253) Satuan Pekerjaan


515379445.xls

BAHAN UPAH
NO. JENIS PEKERJAAN SATUAN VOLUME
SATUAN TOTAL SATUAN TOTAL
PEKERJAAN LANDSCAPING

Ijuk M² 1.00 - #N/A


Bahan Ijuk M² 1.20 - - -
Upah Pemberian Ijuk M² 1.00 - - #N/A #N/A

Humus M² 1.00 - #N/A


Bahan Humus M² 1.10 - - -
Upah Pemberian Humus M² 1.00 - - #N/A #N/A

Rumput Manila M² 1.00 - #N/A


Bahan Rumput Manila M² 1.10 - - -
Upah Penanaman Rumput M² 1.00 - - #N/A #N/A

PEKERJAAN DINDING PARTISI

Dinding Partisi Gypsum M² 1.00 - #N/A


Bahan Gypsum c/w rangka M² 1.00 - - -
Upah Pasang Dinding Partisi Gypsum c/w rangka M² 1.00 - - #N/A #N/A

Dinding Partisi Triplex M² 1.00 - #N/A


Bahan Triplek 4 mm M² 2.00 - - -
Upah Pasang Dinding Partisi Triplex c/w rangka M² 1.00 - - #N/A #N/A

PEKERJAAN LEMARI

Lemari Meja & Dinding Dapur Lot 1.00 - #N/A


Bahan Pasang Lemari Meja & Dinding Dapur (Kantor PKS) Lot 1.00 - - -
Upah Pasang Lemari Meja & Dinding Dapur (Kantor PKS) Lot 1.00 - - #N/A #N/A

135(253) Satuan Pekerjaan


515379445.xls

BAHAN UPAH
NO. JENIS PEKERJAAN SATUAN VOLUME
SATUAN TOTAL SATUAN TOTAL
Lemari Meja Laboratorium Dingin Lot 1.00 - #N/A
Bahan Pasang Lemari Meja Laboratorium Dingin (Kantor PKS) Lot 1.00 - - -
Upah Pasang Lemari Meja Laboratorium Dingin (Kantor PKS) Lot 1.00 - - #N/A #N/A

Lemari Meja Laboratorium Panas Lot 1.00 - #N/A


Bahan Lemari Meja Laboratorium Panas (Kantor PKS) Lot 1.00 - - -
Upah Pasang Lemari Meja Laboratorium Panas (Kantor PKS) Lot 1.00 - - #N/A #N/A

Lemari Meja Ruang Sampel Lot 1.00 - #N/A


Bahan Lemari Meja Ruang Sampel (Kantor PKS) Lot 1.00 - - -
Upah Pasang Lemari Meja Ruang Sampel (Kantor PKS) Lot 1.00 - - #N/A #N/A

136(253) Satuan Pekerjaan


515379445.xls

TOTAL
HARGA

7,049.46

42,299.66

14,100.37

11,348.83

19,430.05

19,430.05

8,717.73

137(253) Satuan Pekerjaan


515379445.xls

TOTAL
HARGA

137,557.89

36,000.00

30,000.00

#N/A

16,675.00

1,361,823.54

138(253) Satuan Pekerjaan


515379445.xls

TOTAL
HARGA

1,361,823.54

25,447.75

25,448.21

28,199.37

25,448.21

139(253) Satuan Pekerjaan


515379445.xls

TOTAL
HARGA

25,448.21

3,095.05

3,095.05

2,923.11

2,923.11

2,923.11

140(253) Satuan Pekerjaan


515379445.xls

TOTAL
HARGA
2,923.11

2,923.11

2,923.11

2,923.11

2,923.11

2,923.11

2,923.11

141(253) Satuan Pekerjaan


515379445.xls

TOTAL
HARGA

2,923.11

2,923.11

2,923.11

2,923.11

2,923.11

2,923.11

2,923.11

142(253) Satuan Pekerjaan


515379445.xls

TOTAL
HARGA

2,923.11

2,923.11

2,923.11

3,610.89

210,979.42

210,979.42

143(253) Satuan Pekerjaan


515379445.xls

TOTAL
HARGA

210,979.42

210,979.42

210,979.42

14,443.58

210,979.42

144(253) Satuan Pekerjaan


515379445.xls

TOTAL
HARGA
945,710.83

13,756.25

13,756.25

13,756.25

13,756.25

13,756.25

13,756.25

13,756.25

145(253) Satuan Pekerjaan


515379445.xls

TOTAL
HARGA

13,756.25

13,756.25

13,756.25

13,756.25

13,756.25

13,756.25

13,756.25

13,756.25

146(253) Satuan Pekerjaan


515379445.xls

TOTAL
HARGA

13,756.25

13,756.25

13,756.25

13,756.25

13,756.25

13,756.25

13,756.25

13,756.25

147(253) Satuan Pekerjaan


515379445.xls

TOTAL
HARGA
13,756.25

13,756.25

13,756.25

13,756.25

13,756.25

13,756.25

13,756.25

13,756.25

13,756.25

148(253) Satuan Pekerjaan


515379445.xls

TOTAL
HARGA

13,756.25

3,701.50

3,701.50

3,701.50

3,701.50

3,701.50

3,701.50

149(253) Satuan Pekerjaan


515379445.xls

TOTAL
HARGA
3,701.50

3,701.50

3,701.50

3,701.50

3,701.50

3,701.50

3,701.50

3,701.50

3,701.50

150(253) Satuan Pekerjaan


515379445.xls

TOTAL
HARGA

3,701.50

3,701.50

3,701.50

3,701.50

3,701.50

3,701.50

3,701.50

3,701.50

151(253) Satuan Pekerjaan


515379445.xls

TOTAL
HARGA

3,701.50

3,701.50

3,701.50

3,701.50

3,701.50

3,701.50

3,701.50

3,701.50

152(253) Satuan Pekerjaan


515379445.xls

TOTAL
HARGA

3,701.50

3,701.50

3,701.50

3,701.50

3,701.50

3,701.50

3,701.50

3,701.50

153(253) Satuan Pekerjaan


515379445.xls

TOTAL
HARGA
3,701.50

3,701.50

3,701.50

3,701.50

3,701.50

3,701.50

3,701.50

3,701.50

3,701.50

154(253) Satuan Pekerjaan


515379445.xls

TOTAL
HARGA

3,701.50

3,701.50

#N/A

3,701.50

3,701.50

3,701.50

3,701.50

3,701.50

155(253) Satuan Pekerjaan


515379445.xls

TOTAL
HARGA

3,701.50

3,701.50

3,701.50

3,701.50

3,701.50

3,701.50

3,701.50

3,701.50

156(253) Satuan Pekerjaan


515379445.xls

TOTAL
HARGA

3,701.50

3,701.50

3,701.50

3,701.50

3,701.50

3,701.50

3,701.50

3,701.50

157(253) Satuan Pekerjaan


515379445.xls

TOTAL
HARGA
3,701.50

3,701.50

3,701.50

3,701.50

3,701.50

3,701.50

3,701.50

3,701.50

3,701.50

158(253) Satuan Pekerjaan


515379445.xls

TOTAL
HARGA

3,701.50

3,701.50

3,701.50

3,701.50

3,701.50

3,701.50

3,701.50

3,701.50

159(253) Satuan Pekerjaan


515379445.xls

TOTAL
HARGA

3,701.50

3,701.50

3,701.50

3,701.50

3,701.50

3,701.50

3,701.50

3,701.50

160(253) Satuan Pekerjaan


515379445.xls

TOTAL
HARGA

3,701.50

3,701.50

3,701.50

3,701.50

3,701.50

3,701.50

3,701.50

3,701.50

161(253) Satuan Pekerjaan


515379445.xls

TOTAL
HARGA
3,701.50

3,701.50

3,701.50

3,701.50

3,701.50

3,701.50

3,701.50

3,701.50

3,701.50

162(253) Satuan Pekerjaan


515379445.xls

TOTAL
HARGA

3,701.50

3,701.50

3,701.50

3,701.50

3,701.50

3,701.50

3,701.50

3,701.50

163(253) Satuan Pekerjaan


515379445.xls

TOTAL
HARGA

3,701.50

3,701.50

3,701.50

3,701.50

3,701.50

3,701.50

3,701.50

3,701.50

164(253) Satuan Pekerjaan


515379445.xls

TOTAL
HARGA

3,701.50

3,701.50

3,701.50

3,701.50

3,701.50

3,701.50

3,701.50

3,701.50

165(253) Satuan Pekerjaan


515379445.xls

TOTAL
HARGA
3,701.50

3,701.50

3,701.50

3,701.50

3,701.50

3,701.50

3,701.50

3,701.50

3,701.50

166(253) Satuan Pekerjaan


515379445.xls

TOTAL
HARGA

3,701.50

3,701.50

3,701.50

3,701.50

3,701.50

3,701.50

3,701.50

3,701.50

167(253) Satuan Pekerjaan


515379445.xls

TOTAL
HARGA

3,701.50

3,701.50

3,701.50

3,701.50

3,701.50

3,701.50

3,701.50

3,701.50

168(253) Satuan Pekerjaan


515379445.xls

TOTAL
HARGA

3,701.50

3,701.50

3,701.50

3,701.50

3,701.50

27,425.38

27,425.38

27,425.38

169(253) Satuan Pekerjaan


515379445.xls

TOTAL
HARGA
3,701.50

3,701.50

3,701.50

3,701.50

3,701.50

3,701.50

3,701.50

3,701.50

3,701.50

170(253) Satuan Pekerjaan


515379445.xls

TOTAL
HARGA

3,701.50

3,701.50

3,701.50

3,701.50

3,701.50

3,701.50

3,701.50

3,701.50

171(253) Satuan Pekerjaan


515379445.xls

TOTAL
HARGA

3,701.50

3,701.50

3,701.50

3,701.50

3,701.50

3,701.50

3,701.50

3,701.50

172(253) Satuan Pekerjaan


515379445.xls

TOTAL
HARGA

3,701.50

3,701.50

3,701.50

18,913.75

1,891.96

6,619.67

500.00

500.00

173(253) Satuan Pekerjaan


515379445.xls

TOTAL
HARGA

500.00

500.00

500.00

500.00

500.00

500.00

500.00

500.00

174(253) Satuan Pekerjaan


515379445.xls

TOTAL
HARGA

500.00

500.00

500.00

500.00

500.00

500.00

500.00

500.00

175(253) Satuan Pekerjaan


515379445.xls

TOTAL
HARGA
500.00

500.00

500.00

500.00

500.00

500.00

500.00

500.00

500.00

176(253) Satuan Pekerjaan


515379445.xls

TOTAL
HARGA

500.00

500.00

500.00

500.00

500.00

500.00

500.00

500.00

177(253) Satuan Pekerjaan


515379445.xls

TOTAL
HARGA

500.00

500.00

500.00

500.00

500.00

500.00

500.00

500.00

178(253) Satuan Pekerjaan


515379445.xls

TOTAL
HARGA

500.00

500.00

500.00

500.00

500.00

500.00

500.00

500.00

179(253) Satuan Pekerjaan


515379445.xls

TOTAL
HARGA
500.00

500.00

500.00

500.00

500.00

500.00

500.00

500.00

500.00

180(253) Satuan Pekerjaan


515379445.xls

TOTAL
HARGA

500.00

500.00

500.00

500.00

500.00

500.00

500.00

500.00

181(253) Satuan Pekerjaan


515379445.xls

TOTAL
HARGA

500.00

500.00

500.00

500.00

500.00

500.00

500.00

500.00

182(253) Satuan Pekerjaan


515379445.xls

TOTAL
HARGA

500.00

500.00

500.00

500.00

500.00

500.00

500.00

500.00

183(253) Satuan Pekerjaan


515379445.xls

TOTAL
HARGA
500.00

500.00

500.00

500.00

500.00

500.00

500.00

500.00

500.00

184(253) Satuan Pekerjaan


515379445.xls

TOTAL
HARGA

500.00

500.00

500.00

500.00

500.00

500.00

500.00

500.00

185(253) Satuan Pekerjaan


515379445.xls

TOTAL
HARGA

500.00

500.00

500.00

500.00

500.00

500.00

500.00

500.00

186(253) Satuan Pekerjaan


515379445.xls

TOTAL
HARGA

500.00

500.00

500.00

500.00

500.00

500.00

500.00

500.00

187(253) Satuan Pekerjaan


515379445.xls

TOTAL
HARGA
500.00

500.00

500.00

500.00

500.00

500.00

500.00

500.00

500.00

188(253) Satuan Pekerjaan


515379445.xls

TOTAL
HARGA

500.00

500.00

500.00

500.00

500.00

500.00

500.00

500.00

189(253) Satuan Pekerjaan


515379445.xls

TOTAL
HARGA

500.00

500.00

500.00

500.00

500.00

500.00

500.00

500.00

190(253) Satuan Pekerjaan


515379445.xls

TOTAL
HARGA

500.00

500.00

500.00

500.00

500.00

500.00

500.00

500.00

191(253) Satuan Pekerjaan


515379445.xls

TOTAL
HARGA
500.00

500.00

500.00

500.00

500.00

500.00

500.00

500.00

500.00

192(253) Satuan Pekerjaan


515379445.xls

TOTAL
HARGA

500.00

500.00

500.00

500.00

500.00

500.00

500.00

500.00

193(253) Satuan Pekerjaan


515379445.xls

TOTAL
HARGA

500.00

500.00

500.00

500.00

500.00

500.00

500.00

500.00

194(253) Satuan Pekerjaan


515379445.xls

TOTAL
HARGA

500.00

500.00

500.00

500.00

500.00

500.00

500.00

500.00

195(253) Satuan Pekerjaan


515379445.xls

TOTAL
HARGA
500.00

500.00

500.00

500.00

500.00

500.00

500.00

500.00

500.00

196(253) Satuan Pekerjaan


515379445.xls

TOTAL
HARGA

500.00

500.00

500.00

500.00

500.00

500.00

500.00

500.00

197(253) Satuan Pekerjaan


515379445.xls

TOTAL
HARGA

500.00

500.00

500.00

500.00

500.00

500.00

500.00

500.00

198(253) Satuan Pekerjaan


515379445.xls

TOTAL
HARGA

500.00

500.00

500.00

500.00

500.00

500.00

500.00

500.00

199(253) Satuan Pekerjaan


515379445.xls

TOTAL
HARGA
500.00

500.00

500.00

500.00

500.00

500.00

500.00

500.00

500.00

200(253) Satuan Pekerjaan


515379445.xls

TOTAL
HARGA

500.00

500.00

500.00

500.00

500.00

500.00

500.00

500.00

201(253) Satuan Pekerjaan


515379445.xls

TOTAL
HARGA

500.00

500.00

500.00

500.00

500.00

500.00

500.00

500.00

202(253) Satuan Pekerjaan


515379445.xls

TOTAL
HARGA

500.00

500.00

500.00

500.00

500.00

500.00

500.00

500.00

203(253) Satuan Pekerjaan


515379445.xls

TOTAL
HARGA
500.00

500.00

500.00

500.00

500.00

500.00

500.00

500.00

500.00

204(253) Satuan Pekerjaan


515379445.xls

TOTAL
HARGA

500.00

500.00

500.00

500.00

500.00

500.00

500.00

500.00

205(253) Satuan Pekerjaan


515379445.xls

TOTAL
HARGA

500.00

500.00

500.00

500.00

500.00

500.00

16,163.66

16,163.66

206(253) Satuan Pekerjaan


515379445.xls

TOTAL
HARGA

16,163.66

29,059.11

21,836.63

#N/A

29,059.11

12,375.00

207(253) Satuan Pekerjaan


515379445.xls

TOTAL
HARGA

8,735.10

21,836.63

21,836.63

#N/A

#N/A

29,059.11

208(253) Satuan Pekerjaan


515379445.xls

TOTAL
HARGA

58,117.75

1,210,000.00

1,359,760.25

16,335.00

15,125.00

12,100.00

209(253) Satuan Pekerjaan


515379445.xls

TOTAL
HARGA

15,730.00

12,100.00

12,100.00

12,100.00

15,125.00

12,100.00

12,100.00

210(253) Satuan Pekerjaan


515379445.xls

TOTAL
HARGA
12,100.00

87,725.00

15,730.00

30,250.00

9,801.00

211(253) Satuan Pekerjaan


515379445.xls

TOTAL
HARGA

8,081.83

32,326.11

32,326.11

32,326.11

32,326.11

212(253) Satuan Pekerjaan


515379445.xls

TOTAL
HARGA

40,407.63

40,407.63

40,407.63

40,407.63

213(253) Satuan Pekerjaan


515379445.xls

TOTAL
HARGA

#N/A

8,081.53

12,035.63

12,035.63

214(253) Satuan Pekerjaan


515379445.xls

TOTAL
HARGA
16,163.66

14,443.04

473.35

6,534.00

8,081.83

6,534.00

215(253) Satuan Pekerjaan


515379445.xls

TOTAL
HARGA

24,072.71

24,072.71

24,072.71

24,072.71

24,072.71

24,072.71

24,072.71

24,072.71

216(253) Satuan Pekerjaan


515379445.xls

TOTAL
HARGA

283,713.54

141,856.04

283,713.54

141,856.04

32,325.88

8,081.83

8,081.83

217(253) Satuan Pekerjaan


515379445.xls

TOTAL
HARGA
24,072.71

141,856.04

141,856.04

141,856.04

1,210,000.00

48,489.54

8,081.83

218(253) Satuan Pekerjaan


515379445.xls

TOTAL
HARGA

8,081.83

8,081.83

24,072.71

24,072.71

24,072.71

24,072.71

24,072.71

24,072.71

219(253) Satuan Pekerjaan


515379445.xls

TOTAL
HARGA

24,072.71

24,072.71

24,072.71

24,072.71

24,072.71

24,072.71

8,081.83

8,081.83

220(253) Satuan Pekerjaan


515379445.xls

TOTAL
HARGA

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

88,553.12

221(253) Satuan Pekerjaan


515379445.xls

TOTAL
HARGA

40,407.71

40,407.71

20,977.04

27,511.04

213,400.00

170,720.00

213,400.00

222(253) Satuan Pekerjaan


515379445.xls

TOTAL
HARGA

#N/A

223(253) Satuan Pekerjaan


515379445.xls

TOTAL
HARGA

#N/A

#N/A

224(253) Satuan Pekerjaan


515379445.xls

TOTAL
HARGA

#N/A

#N/A

225(253) Satuan Pekerjaan


515379445.xls

TOTAL
HARGA

#N/A

#N/A

226(253) Satuan Pekerjaan


515379445.xls

TOTAL
HARGA

243,486.37

#N/A

227(253) Satuan Pekerjaan


515379445.xls

TOTAL
HARGA

243,486.37

82,997.55

228(253) Satuan Pekerjaan


515379445.xls

TOTAL
HARGA

84,785.81

548,107.59

#N/A

229(253) Satuan Pekerjaan


515379445.xls

TOTAL
HARGA

339,006.18

#N/A

230(253) Satuan Pekerjaan


515379445.xls

TOTAL
HARGA

#N/A

#N/A

231(253) Satuan Pekerjaan


515379445.xls

TOTAL
HARGA

#N/A

157,961.86

228,411.04

232(253) Satuan Pekerjaan


515379445.xls

TOTAL
HARGA

#N/A

#N/A

233(253) Satuan Pekerjaan


515379445.xls

TOTAL
HARGA

#N/A

#N/A

234(253) Satuan Pekerjaan


515379445.xls

TOTAL
HARGA

#N/A

94,459.34

235(253) Satuan Pekerjaan


515379445.xls

TOTAL
HARGA

#N/A

#N/A

236(253) Satuan Pekerjaan


515379445.xls

TOTAL
HARGA

82,997.55

#N/A

94,459.34

237(253) Satuan Pekerjaan


515379445.xls

TOTAL
HARGA

#N/A

#N/A

238(253) Satuan Pekerjaan


515379445.xls

TOTAL
HARGA

#N/A

#N/A

239(253) Satuan Pekerjaan


515379445.xls

TOTAL
HARGA

#N/A

#N/A

#N/A

240(253) Satuan Pekerjaan


515379445.xls

TOTAL
HARGA

176,890.17

307,071.72

241(253) Satuan Pekerjaan


515379445.xls

TOTAL
HARGA

420,270.12

#N/A

242(253) Satuan Pekerjaan


515379445.xls

TOTAL
HARGA

#N/A

#N/A

243(253) Satuan Pekerjaan


515379445.xls

TOTAL
HARGA

#N/A

#N/A

244(253) Satuan Pekerjaan


515379445.xls

TOTAL
HARGA

#N/A

245(253) Satuan Pekerjaan


515379445.xls

TOTAL
HARGA

#N/A

#N/A

246(253) Satuan Pekerjaan


515379445.xls

TOTAL
HARGA

88,249.96

148,844.45

19,234.77

19,234.77

247(253) Satuan Pekerjaan


515379445.xls

TOTAL
HARGA

17,445.25

204,562.51

13,461.88

248(253) Satuan Pekerjaan


515379445.xls

TOTAL
HARGA

163,832.84

17,047.50

24,072.64

24,098.84

8,081.83

8,081.83

8,081.83

249(253) Satuan Pekerjaan


515379445.xls

TOTAL
HARGA

8,081.83

13,756.25

24,072.64

8,081.83

8,081.83

8,081.83

8,081.83

8,081.83

250(253) Satuan Pekerjaan


515379445.xls

TOTAL
HARGA

16,163.66

24,072.71

40,407.71

56,398.58

56,398.58

56,398.58

56,398.58

#N/A

251(253) Satuan Pekerjaan


515379445.xls

TOTAL
HARGA

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

252(253) Satuan Pekerjaan


515379445.xls

TOTAL
HARGA
#N/A

#N/A

#N/A

253(253) Satuan Pekerjaan

Anda mungkin juga menyukai