500 500
A +43.27 +43.27
500
1500
+41.47 775 775 +41.47
600
600
+41.27 +41.27
+40.87 +40.87
1020
1020
400
400
300
+39.85 +39.85
+39.55 +39.55
+39.15 +39.15
500 350 500
400
8000
400
Potongan Memanjang A-A
Skala 1:100
C C
500
200
300
1500
200
350
2800
B B
7000
8000
400
1020
400 300
Timbunan Tanah Padat
2550
500
Keterangan
Q (m3/s) 3,77 2800
300
b saluran (m) 2,55
h air (m) 1,02
400
V (m/s) 1,5
1020
Va (m/s) 0,61
b (m) 2,55
400 300
A h (m) 1,42 2550
400 400
L (m) 8
Skema Gorong-Gorong PA-2
I 0,001 Potongan Melintang C-C
Skala 1:100
Skala 1:50